Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA

EAST GOSHEN TOWNSHIP

BOARD OF SUPERVISORS

Tuesday, May 7, 2013
7:00 PM

  1. Call to Order
  2. Pledge of Allegiance
  3. Moment of Silence – Supervisor Carmen Battavio
  4. Ask if anyone is recording the meeting
  5. Public Comment – Hearing of Residents (Optional)
  6. Chairman’s Report Interview applicant for Township Elected Auditor position; Comp Plan Update - Announce East Goshen Community Visioning Event – June 3, 2013 @ 7PM
  7. Public Hearings - None
  8. Police/EMS Report – None Fire Marshal – Apr 26, 2013
  9. Financial Report – None
  10. Old Business
  11. New Business Consider Board’s position on John Nicholson’s variance request for 10 Board Street; Consider Ashleybrook Estates (formerly Sullivan’s Grove); Consider revising Peddling and Soliciting Ordinance; Consider Milltown Dam Bid Results; Consider proposal for geothermal engineering services; Consider date for second meeting in May
  12. Any Other Matter
  13. Approval of Minutes April 16, 2013
  14. Treasurer’s Report May 2, 2013
  15. Review Action List May 7, 2013
  16. Correspondence, Reports of Interest Acknowledge East Goshen’s award of a State Grant in the amount of $15,148 under the Recycling Performance Grant Program through the PA DEP; Acknowledge letter thanking Mark Miller, Public Works Department and Joanne Morgan for outstanding reponse to emergency situation; Acknowledge Sunoco Remediation Report; Acknowledge Mark Miller’s May Activity Report; Acknowledge letter regarding signs, banners and cars
  17. Dates of Importance May 07, 2013 Board of Supervisors 7:00 PM

F:\Data\Shared Data\Agendas\Board of Supervisors\2013\05072013.doc

May 08, 2013 Conservancy Board 7:00 PM
May 09, 2013 Historical Commission 7:00 PM
May 09, 2013 Outdoor Market Begins
East Goshen Park (Summer Hours Begin)
3-7PM
May 13, 2013 Municipal Authority 7:00 PM
May 16, 2013 Farmers Market 3-7 PM
May 20, 2013 Commerce Commission 7:00 PM
May 20, 2013 Deer Commission 7:00 PM
May 21, 2013 Municipal Primary Election 7 AM-8 PM
May 21, 2013 Board of Supervisors NO MEETING
May 22, 2013 Police Commission
WEGO Police Dept
5:30 PM
May 23, 2013 Farmer’s Market 3-7 PM
May 27, 2013 Memorial Day
Office Closed
May 30, 2013 Farmers Market 3-7 PM
May 30, 2013 Comp Plan Task Force 7:00 PM
June 3, 2013 EGT Community Visioning Event 7:00 PM

Summer 2013 Newsletter:
Article Submission Date – May 15, 2013
Post to website – June 15, 2013

  1. Public Comment – Hearing of Residents
  2. Adjournment

The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.

F:\Data\Shared Data\Agendas\Board of Supervisors\2013\05072013.doc

Rick Smith

From: jim dehaven [illegible]
Sent: Friday, April 26, 2013 9:34 AM
To: rick smith
Subject: Township Auditor Position

Dear Rick,

I would be interested in serving as Township Auditor.

I have been a resident of East Goshen since 1986. Our first home was in Bow Tree. In 1996 we moved to Clocktower Woods until 2010. We currently reside at 812 Grist Mill Lane at The Preserve at Applebrook.

Please let me know any requirements that I must meet.

I thank you in advance for your consideration.

- Jim

[Seal of Township of East Goshen, Chester County, Pennsylvania, Incorporated 1817]

East Goshen Township
Community Visioning Event

East Goshen Township residents: An exciting opportunity exists for you to help establish a preferred vision for our community. The Township Comprehensive Plan Task Force invites you to join them and their planning consultant, the Brandywine Conservancy, to step back from your day-to-day activities on the evening of June 3rd and look with them at the big picture for East Goshen. By attending this meeting, you will help us answer questions such as..... “Where is our community now? Where is it going? Where do we want it to be in the future? And how can we help get it there? Together we will explore our residential neighborhoods, shopping centers, office parks, open space, trails, our natural and historic resources, economic development, traffic and parking, and energy conservation, as well as other features you believe are important to the future of our community. Staff from the Conservancy will summarize comments at the end of the session. A draft community vision will then be formed and posted on the Township website for public comments. A final community vision, to be adopted by the Board of Supervisors, will be used to guide the Township’s comprehensive plan and referred to by all of the Township’s committees and commissions for future decision-making. Please join us for this important community event.

Who: All East Goshen Township Residents
What: Community Visioning Event
Where: East Goshen Township building
When: June 3, 2013 @ 7PM

Visit the Township website to see what the Comprehensive Plan Task Force has discussed to date.
http://www.eastgoshen.org/boards/comprehensive-plan-task-force.php

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171 Fax 610-692-8950
www.eastgoshen.org

Date: April 26, 2013
To: Board of Supervisors
From: Carmen Battavio
Re: Fire Marshal Report

Fire Marshal activities as of 4/26/2013

4/25/2013- Master P Karate, Goshen Village Shopping Center

Met Mark Gordon on site with owner to go over maximum occupancy limits of assembly areas.

Visit stemmed from a unanimous call to the township regarding over limits at certain times.

Measured space with Mark so a new occupancy sign can be furnished to the owner.

Mark and I both agree the space allows for many more occupants than the complainant mentioned.

TIS-.30 hrs
Mileage 2

C:\Documents and Settings\mgordon\Local Settings\Temporary Internet Files\Content.Outlook\21VWPISM\4 26 2013.doc

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 5/2/2013
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: Zoning Variance request / 10 Broad Street (Nicholson)

Dear Board Members:

John Nicholson, 10 Broad St., has submitted a Zoning Variance request for dimensional relief from the side yard setback requirement in order to construct a two story addition to his home at 10 Broad St. The lot is fifty (50) feet wide and the proposed addition will encroach 9 feet into the side yard setback. These relief requests are very common in the Milltown neighborhood. A hardship is evident because of the narrowness of the lot and was not created by the applicant. Supporting this relief will not alter the character of the neighborhood.

Draft Motion:
I move that we recommend that the Zoning Hearing Board approve the Zoning Variance application for Mr. Nicholson reducing the required twenty (20) foot side yard setback to eleven (11) feet due to the narrowness of the lot. The relief sought is common in the Milltown neighborhood due the prevalence of lots that only have a width of fifty feet. The new proposed addition to the home will not encroach any closer than the existing structure and will not alter the essential character of the neighborhood.

F:\Data\Shared Data\Property Management\53-6F\53-6F-18 (10 Broad St.)\Dem Variance 2013\BOS Draft Motion to 05022013.docx

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 2, 2013

East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380

Re: Dimensional Variance request: 10 Broad Street, West Chester, 19382

Dear Board Members:

At their meeting on May 1, 2012 the Planning Commission voted unanimously in favor of the following motion:

Madame Chairman, I move that we recommend that the Board of Supervisors support the Zoning Variance application for Mr. Nicholson reducing the required twenty (20) foot side yard setback to eleven (11) feet due to the narrowness of the lot. The relief sought is common in the Milltown neighborhood due the prevalence of lots that only have a width of fifty feet. The new proposed addition to the home will not encroach any closer than the existing structure and will not alter the essential character of the neighborhood.

Sincerely,
Mark A. Gordon
Zoning Officer

F:\Data\Shared Data\Property Management\53-6F\53-6F-18 (10 Broad St.)\Dem Variance 2013\PC Rec to BOS 05022013.doc

EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION

1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

Name of Applicant: John T. Nicholson, Dorothy A. Kennedy
Applicant Address: 10 Broad St, West Chester PA 19382
Telephone Number: 610 431 2205 Fax Number: SAME (call first)
Email Address: JTNICHOLSONLAW@COMCAST.NET
Property Address: 10 Broad St, West Chester PA 19382
Tax Parcel Number: 53-06F-0018.0000 Zoning District: R-3 Acreage: 150 x 50 = 7,500 sq ft

Purpose of Application (check one)
Variance ( Type: [ ] Use Variance [x] Dimensional Variance )
[ ] Special Exception
[ ] Appeal determination of the Zoning Officer
[ ] Other

Sections of Zoning Ordinance in which relief is sought:
§ 240-10(6)

Description of the Zoning Relief requested and the future use of the property:
RELIEF from 20' side yard set back requirements of § 240-10(6)
Applicants intend to build two story addition to back of house

We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.

Signature of Applicant: John T. Nicholson, Dorothy A. Kennedy Date: 4/25/2013

*Please review the formal application and review procedures on page three.

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 1 -

EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION

1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.

Applicant Name: ____________________________________________________

Application Process Checklist (Administration use only):

Item Date Complete
1. Completed Township Application Form: __________
2. All related materials submitted: __________
3. Township application and review fees paid: __________

Application accepted on __________ by ________________________________________
Official Signature ________________________________________ Title ____________________

Review Process Checklist

Item Date
1. Start date: __________
2. Date of first formal Planning Commission Meeting following complete application: __________
3. Date sent to CCPC: __________
4. Date sent to Township Engineer: __________
5. Date presented to Planning Commission: __________
6. Date sent to CB: __________
7. Date sent To MA: __________
8. Date sent to HC: __________
9. Date sent to PRB: __________
10. Date sent to TAB: __________
11. Date by which the PC must act: __________
12. Date by which Board of Supervisors must act: __________
13. Drop Dead Date; (Day 60): __________
14. Zoning Hearing Date: __________
15. Dates of public advertisement: __________ & __________

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 2 -

A1.1 - 1st and 2nd Floor Plans - Nicholson Residence

Architectural floor plan drawings (Sheet A1.1) showing the First Floor Plan (1/A1.1) and Second Floor Plan (2/A1.1) for the Nicholson Residence at 10 Broad Street, West Chester, PA 19382, East Goshen Township, Chester County, PA.

1 / A1.1 - 1ST FLR PLAN (SCALE: 1/4" = 1'-0")

  • Rooms and Labels: SCREEN PORCH, MASTER BEDROOM, MUD ROOM / ENTRY, BATHROOM, EXISTING KITCHEN, FRIDGE, R
  • Dimensions: 21'-0", 2'-6", 16'-0", 2'-6", 10'-0", 21'-0", 7'-4", 3'-2", 3'-7", 7'-4", 2'-2 1/2", 5 1/2", 15'-2", 11'-8 1/2", 11'-2 1/2", 5'-2", 5 1/2", 5 1/2", 23'-0", 20'-0", 6'-6 1/2", 5 1/2", 6'-5", 17'-6 1/2", 3 1/2", 3'-1 1/2", 3'-2", 3 1/2", 2'-11", 5 1/2", 20'-5 1/2", 2'-5", 3 1/2", 10'-6", 3'-1", 3 1/2", 6'-1", 3 1/2", 10'-4", 7'-3", 5'-0", 5'-0", 5'-0", 5'-0", 21'-0"

2 / A1.1 - 2ND FLR PLAN (SCALE: 1/4" = 1'-0")

  • Rooms and Labels: MASTER BEDROOM, MASTER BATH, OFFICE, EXISTING BEDROOM, EXISTING BEDROOM
  • Dimensions: 23'-5 1/2", 8'-1 1/2", 15'-5", 8'-1 1/2", 5 1/2", 11'-10 1/2", 3 1/2", 12'-6", 5 1/2", 5 1/2", 3'-0", 3 1/2", 4'-0", 3 1/2", 3 1/2", 4'-0", 15'-4", 23'-5 1/2", 11'-8 1/2", 7'-7", 3 1/2", 2'-1 1/2", 3 1/2", 3'-9 1/2", 3'-2", 7'-8 1/2", 3 1/2", 21'-0", 10'-6", 10'-6"

Title Block

  • SEAL: SEAL DATE: 4/12/13; REGISTRATION EXPIRES: 7/31/13. The professional services of the architect under terms of this agreement extend to the original owner only. No contractual obligation is assumed by the architect for use thereof by any other person involved in the project. The architect who affixed, signed and dated such seal does not hold a current contract to furnish construction administration services as defined in 24 Del.C. 303(7).
  • ARCHITECTURAL ALLIANCE - ARCHITECTURE • PLANNING • INTERIOR DESIGN • GRAPHIC ARTS: 1309 VEALE ROAD, SUITE 22, WILMINGTON, DE 19810, 302.478.3777; 401 SUNSET HOLLOW ROAD, SUITE 300, WEST CHESTER, PA 19380, 610.640.9000
  • 4/12/13 ISSUED FOR REVIEW (NOT FOR CONSTRUCTION)
  • PROJECT NAME: NICHOLSON RESIDENCE, 10 BROAD STREET, WEST CHESTER, PA 19382, EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
  • PROJECT NO: 2012-018; DRAWN BY: PBJ; CHK'D BY: BTC; DATE: 4/12/13; © COPYRIGHT 2012
  • DRAWING NUMBER: A1.1

SITE (SCALE: 1/16" = 1'-0") - A1.01

Architectural site plan drawing (Sheet A1.01) showing property boundaries, setback lines, existing buildings, and proposed additions for the Nicholson Residence at 10 Broad Street, West Chester, PA 19382.

Site Plan Labels and Dimensions

  • Streets and Adjoining Properties: "CHERRY STREET", "BROAD STREET", ALLEY, PHILIP W. & BRENDA D. POLK, EDITH W. HAGA & M. JOYCE MARTIN, N (North arrow)
  • Property and Setback Dimensions: 150'-0", 50'-0", 16'-0", 30'-0", 36'-0", 4'-0", 71'-0", 20'-0", 10'-0", 20'-0", 10'-0", 30'-0", 20'-0", 11'-0", SETBACK LINE, FRONT YARD
  • Structures and Areas: EXIST. SHED (RELOCATED) 80.00 sq ft; EXIST. SHED (CURRENT LOCATION); NEW DECK 160.00 sq ft; NEW ADDITION 484.57 sq ft; DEMO PORCH 126.00 sq ft; NEW SIDEWALK 30.00 sq ft; NEW DECK 24.00 sq ft; EXIST. GRAVEL DRIVEWAY 432.00 sq ft; EXIST. HOUSE 690.00 sq ft; FREEZER; FRONT PORCH 65.00 sq ft; SIDEWALK 45.00 sq ft

Title Block

  • ARCHITECTURAL ALLIANCE - ARCHITECTURE • PLANNING • INTERIOR DESIGN • GRAPHIC ARTS
  • DELAWARE: 1309 VEALE ROAD, SUITE 22, WILMINGTON, DE 19810, 302-478-3777
  • PENNSYLVANIA: 401 SUNSET HOLLOW RD, SUITE 300, WEST CHESTER, PA 19380, P 610.640.9000 F 610.640.9003
  • PROJECT NAME: NICHOLSON RESIDENCE, 10 BROAD STREET, WEST CHESTER, PA 19382, EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
  • DRAWN BY: PBJ; CHK'D BY: BTC; DATE: 4/12/13; © COPYRIGHT 2013; PLOT DATE 4/12/13
  • DRAWING NUMBER: A1.01

ZONING DATA - A1.02

ZONE: R-3 PRINCIPLE USES REQUIREMENTS

REQUIREMENTS SINGLE FAMILY DETACHED DWELLING PROVIDED
MINIMUM LOT AREA 18,000 SQ. FT. 7,500 SQ. FT.
MINIMUM LOT WIDTH
AT BUILDING SETBACK LINE 100 FT. 50 FT.
AT STREET LINE 50 FT. 50 FT.
MAXIMUM LOT COVERAGE
BY BUILDINGS 20% 20.8% 1560 SQ. FT.
BY TOTAL IMPERVIOUS COVER 35% 28.5% 2137 SQ. FT.
MAXIMUM BUILDING HEIGHT
STORIES 3 2
FEET 35 FT. 26 FT.
MINIMUM FRONT YARD 30 FT. 20 FT. (EXISTING CONDITION)
AVERAGE FRONT YARD 40 FT.
MINIMUM SIDE YARD 20 FT. 10 FT. *
MINIMUM REAR YARD 30 FT. 21 FT.

* RELATES TO VARIANCE

SITE SURVEY PROVIDED BY:

REGISTERED ASSOCIATES, INC., REGISTERED LAND SURVEYORS, P.O. BOX 406, KENNETT SQUARE, PA 19348, (610) 444-5554

LOT COVERAGE EXISTING:

  • BUILDING: 690 SQ. FT. (HOUSE); 65 SQ. FT. (FRONT PORCH); 126 SQ. FT. (COVER PORCH)(TO BE REMOVED); 80 SQ. FT. (SHED)
  • SITE: 432 SQ. FT. (GRAVEL DRIVEWAY); 45 SQ. FT. (SIDEWALK)
  • TOTAL: 1438 SQ.FT. (1313 SQ. FT. AFTER DEMO)

LOT COVERAGE NEW:

  • BUILDING: 485 SQ. FT. (NEW ADDITION); 160 SQ. FT. (NEW DECK); 24 SQ. FT. (NEW DECK)
  • SITE: 30 SQ. FT. (NEW SIDEWALK)
  • TOTAL AFTER ADDITION: 2137 SQ. FT.

Title Block

  • ARCHITECTURAL ALLIANCE - ARCHITECTURE • PLANNING • INTERIOR DESIGN • GRAPHIC ARTS
  • DELAWARE: 1309 VEALE ROAD, SUITE 22, WILMINGTON, DE 19810, 302-478-3777
  • PENNSYLVANIA: 401 SUNSET HOLLOW RD, SUITE 300, WEST CHESTER, PA 19380, P 610.640.9000 F 610.640.9003
  • PROJECT NAME: NICHOLSON RESIDENCE, 10 BROAD STREET, WEST CHESTER, PA 19382, EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
  • DRAWN BY: PBJ; CHK'D BY: BTC; DATE: 4/12/13; © COPYRIGHT 2013; PLOT DATE 4/12/13
  • DRAWING NUMBER: A1.02

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 5/2/2013
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: Ashleybrooke Estates (Formerly Sullivan’s Grove)

Dear Board Members:

As you know, the Sullivan’s grove parcel and the approved subdivision plan is being sold by West Chestnut Realty Co.(Wooldridge Const.) to a private developer. In February the Board heard the proposal and asked staff to have the plan reviewed by the Historical Commission and the Conservancy Board in preparation for the minor changes to the plan. Both the Conservancy Board and the Historical Commission have accepted the outlined changes to the plan.

Since that time the HOA Documents have been revised and approved by the Solicitor, the plans have been modified to reflect the new ownership and the construction escrow has been reviewed by the township engineer.

The applicant has some minor corrections to address on the plans and also has a few minor changes to address on the construction cost breakdown.

Recommendation:
I recommend that the Board move to execute the plans, the Subdivision and Land Development agreement and the Financial Security Agreement upon correction of the items outlined by the Township Engineer and final review by the staff.

F:\Data\Shared Data\Property Management\53-2\53-2-25.2 (Sullivan Grove)\Memo to BOS 05022013.doc

Yerkes

Yerkes Associates, Inc. Consulting Engineers / Landscape Architects / Surveyors

May 2, 2013

East Goshen Township
1580 Paoli Pike
West Chester, Pennsylvania 19380

Attn: Mark Gordon, Township Zoning Officer

Re: Ashleybrooke Estates (Previously Sullivan’s Grove) – 4 Lot Subdivision Plan
Review of Preliminary/Final Plan and Cost Construction Estimate

Dear Mark:

We have received for review the following revised plans and correspondence prepared by Edward B. Walsh & Associates, Inc.:

Plans dated 08-31-05, last revised 04-09-13

  • Sheet 1 of 8 – Subdivision Plan
  • Sheet 2 of 8 – Existing Features Plan
  • Sheet 3 of 8 – Grading & Utilities / Post Construction Stormwater Management Plan
  • Sheet 4 of 8 – Erosion & Sedimentation Control Plan
  • Sheet 5 of 8 – Detail Sheet
  • Sheet 5A of 8 – Profile Plan
  • Sheet 6 of 8 – Detail Plan
  • Sheet 7 of 8 – Detail Plan
  • Sheet 8 of 8 – Landscape Plan
  • Sheet 8A of 8 – Landscape Plan
  • Highway Occupancy Permit Plans, Sheets 1 through 5, dated 01-08-09, last revised 06-30-09

Correspondence

  • E. B. Walsh & Assoc., Inc. (EBW) letter to Yerkes Assoc., Inc dated 04-09-13
  • East Goshen Township Board of Supervisors letter dated 03-13-13
  • Copy of Yerkes Assoc., Inc. review letter of 09-28-13
  • East Goshen Township Board of Supervisors (BOS) meeting minutes, issued 10-20-09
  • Site details of Sullivan’s Grove Subdivision
  • Final Subdivision Construction Cost Estimate, prepared 04-09-13

The submitted plans, under equitable ownership of the Renehan Building Group, have been reviewed for compliance with both the preliminary and final plan requirements of the Ordinances. The following comments are offered for consideration:

Professional services since 1874
1444 Phoenixville Pike, P. O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771

Ashleybrooke Estates (Sullivan’s Grove) – Green Hill Road
May 2, 2013
Page 2 of 3

Plans

  1. Sheet 1-Existing features Plan: Revise or add the following notes: [Note: Make change to Sheet 1] The equitable owner Renehan Building Group name and contact information should be noted on the plan.; Although the current owner Woodridge will sign the plan for recordation, it is recommended that their name be removed from Stormwater Management acknowledgement and replaced with Renehan Building Group to sign. They will be ultimately responsible for the property and should sign the Stormwater acknowledgement. Also, the last revised plan date within the note is July 30, 2009 and should be revised to match the lastest revision date on the plan. This note has not been signed on the plan.; Note No. 24: The last revised date for the Lot restrictions should be added. [Note: Written for date to be inserted]; The Engineer’s certification should be signed. [Note: Intended to be signed on the plan to be recorded]; The Land Surveyor’s statement should be signed. [Note: Intended to be signed on the plan to be recorded]
  2. Sheet 5 of 7: Correct in the Sullivan Circle Infiltration Bed cross-section distribution pipe from 6 in. to 8 in the profile view. [Note: Make change to Sheet 5; Detail was not revised from approved plan.]
  3. Sheet 7 of 8: The paving cross-sections on the plan should be revised in accordance with the new paving specifications for the private street and the PennDOT paving specifications as indicated on the construction cost estimate. [Note: Approved without this information]
  4. According to the BOS meeting minutes it is unclear when the development start of construction will occur. The status of the following permits will need to be verified for the current or future construction: [Note: NPDES Renewed; PennDOT Extended] NPDES Permit: The PADEP website and Site Status documentation provided indicates that the NPDES Permit was issued in 09-29-08 and Renewal of permits must be applied for 180 days before expiration. Also, the NPDES regulations have been revised since 2010 and the site is in a Specially Protected High Quality Watershed. Updates from the CCCD and PADEP regarding plan review and permit status should be provided.; PennDOT Highway Occupancy Permit (HOP): An HOP is typically for one-year. We recommend a copy of the current or renewed HOP along Green Hill Road be provided.
  5. Street Name Change: The road name change is to remain the same as before and has not changed on the plan. This is consistent as stated in EBW letter. [Note: Informational]
  6. Street Dedication: “Sullivan Circle” is to be a private street and will not to be dedicated to the Township. We recommend the Maintenance Agreement per Note No. 15, on Sheet 1 be prepared and (or updated if previously prepared) be submitted to the Township for review and approval. [Note: HOA Docs contain this information]

Construction Cost Estimate for Community Improvements

Note we have attached a revised spread sheet based on the submitted construction cost estimate. Items in red are what have been revised as noted below:

Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771

Ashleybrooke Estates (Sullivan’s Grove) – Green Hill Road
May 2, 2013
Page 3 of 3

[Note: Revise Estimate Accordingly]

  1. Line Item No. 2: Add demolition category and expanded as follows: Add line item 2.1, add revise lump sum quantity to note three existing structures (Includes Comcast building), and update unit price;; add line item 2.2 existing Comcast concrete pad;; add line item 2.3 existing Comcast generator;; add line item remove modular building;; add line item 2.4 existing driveway paving;; add line item 2.5 for selective tree removal;; add line item 2.6 for Comcast fiber optic and service box removal.; add line item 2.7 for existing utility pole;; and add line item 2.8 for water line and hydrant.
  2. Line Item 3.4: Revise Borrow to note, “On-Site”. If any borrow is to be off-site it should be updated.
  3. Line Items 3.6 (Respread and Grade Topsoil) and 3.7 (Seed and Mulch): These items are noted as included as part of the earthwork but it is unclear how they have been addressed. Costs associated with these line items should be included separately.
  4. Line Item 8.2: Revise removal of sanitary manhole cost to $2,000.00.
  5. Line Item 8.5: Revise description, quantity and cost to note total of 4 lateral connections.
  6. Line Item 8.6: Revise description, quantity and cost to note total of 4 saddle connections.
  7. Line Item 10: Add Miscellaneous, 10.1 Remove and Relocate Existing Fencing.

The plans and construction cost estimate should be revised in accordance with the comments listed. Please do not hesitate to contact our office if there are any questions concerning the above.

Sincerely,
YERKES ASSOCIATES, INC.
Charles E. Jackson III
Michael Conrad, P.E.

Cc: Rick Smith, Township Manager
Edward B. Walsh & Associates, Inc.

Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 2, 2013

Board of Supervisors
East Goshen Township
1508 Paoli Pike
West Chester, PA 19380

Re: Ashleybrooke Estates (Formerly Sullivan’s Grove) / Street and Subdivision Name

Dear Board Members:

At their meeting in April 11, 2013 the Historical Commission discussed the plans for Ashleybrooke Circle (Formerly Sullivan’s Grove) and had no issue with changing the name of the subdivision to Ashleybrooke Estates. The Historical Commission was also happy to hear that the street name would remain Sullivan Circle.

Sincerely,
Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Property Management\53-2\53-2-25.2 (Sullivan Grove)\HC letter to BOS 05022013.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 2, 2013

Board of Supervisors
East Goshen Township
1508 Paoli Pike
West Chester, PA 19380

Re: Ashleybrooke Estates (Formerly Sullivan’s Grove) Landscape Plan

Dear Board Members:

At their meeting in April 10, 2013 the Conservancy Board reviewed the landscaping plans for Ashleybrooke Circle (Formerly Sullivan’s Grove) and had no issues with the removal of the privacy wall or entrance walls depicted on the original plans. The Board was also happy to hear that the existing landscaping along Greenhill Road will be preserved to a greater extent due to the removal of the fences and walls.

Sincerely,
Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Property Management\53-2\53-2-25.2 (Sullivan Grove)\CB letter to PC 05022013.doc

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: (610) 692-7171
Fax: (610) 425-8950
E-mail: rsmith@eastgoshen.org

Date: April 25, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Peddling and Soliciting Ordinance

I would suggest that we revise the Peddling and Soliciting Ordinance as noted in the attached ordinance.

Section 1 – Under the revised ordinance the applicant would be required to provide us with 2 passport photos. If a license was approved the Township would issue the applicant a license with a photo that he would wear on his outer clothing.

Section 2 – We note that there is a fee for the licenses and a separate fee for the background check, and brought the standards for issuing a license into conformance with current court rulings.

Section 3 – We limited the hours based on recent court decisions.

If these changes are acceptable I will proceed with scheduling a hearing for adoption.

F:\Data\Shared Data\Admin Dept\Township Code\Peddling 2013\Memo 042513.docx

EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO.

AN ORDINANCE OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, AMENDING CHAPTER 169 OF THE EAST GOSHEN TOWNSHIP CODE, TITLED, “PEDDLING AND SOLICITING”, TO AMEND SECTIONS 169-2 AND 169-3 CONCERNING THE APPLICATION PROCESS AND RULES OF CONDUCT FOR PEDDLING AND SOLICITING IN EAST GOSHEN TOWNSHIP.

BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, that Chapter 169 of the East Goshen Township Code, titled, “Peddling and Soliciting”, shall be amended as follows:

SECTION 1. Section 169-2.A shall be amended to add a new paragraph 9 which shall state as follows:

“(9) Two 2 inch by 2 inch photographs of the applicant taken within six months of the application that meet the requirements for a U.S. Passport.

SECTION 2. Section 169-2.B shall be amended as follows:

“Upon submission of the application, and the payment of a license fee and the fee charged for a Pennsylvania State Police background check, as set forth from time to time by resolution of the Board of Supervisors, the Township shall forward a copy of the application to the Pennsylvania State Police which shall, determine and report to the Township whether the applicant has ever been convicted of a crime constituting a misdemeanor, felony or a summary offense other than a traffic violation. The Township Manager shall not issue a license to any applicant convicted of any felony or misdemeanor who is still under court-ordered supervision of any kind as a result of said conviction(s). Otherwise, the Township Manager shall issue a license in the form of a card which shall contain a photograph of the applicant and which shall, unless revoked, entitle the applicant as the licensee to engage in the business or activity specified on the application for a period of one year from the date of issuance.”

SECTION 3. Section 169-3.A shall be amended as follows:

“He shall wear his license card with the photograph attached thereto at all times on his outer clothing and exhibit it upon request to any police officer or any person upon whom he shall call or with whom he shall talk in carrying on his licensed activities.”

SECTION 4. Section 169-3 shall be amended to add a new subparagraph "F" which shall state as follows:

"F. Activities which are licensed pursuant to this chapter of the Code shall only be conducted between the hours of 9:00 a.m. to 9:00 p.m. Monday through Friday, 9:00 a.m. to 6:00 p.m. on Saturdays and 12:00 p.m. to 6:00 p.m. on Sundays."

SECTION 5. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.

SECTION 6. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.

SECTION 7. Effective Date. This Ordinance shall become effective in five days from the date of adoption.

ENACTED AND ORDAINED this _____day of _________________, 2013.

ATTEST:
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS

____________________________________
Louis F. Smith, Secretary

____________________________________
Senya D. Isayeff, Chairman

____________________________________
Thom Clapper Ph.D, Vice-Chairman

____________________________________
E. Martin Shane, Member

____________________________________
Carmen Battavio, Member

____________________________________
Charles W. Proctor, III, Esquire, Member

F:\Data\Shared Data\Admin Dept\Township Code\Peddling 2013\Pedldling 042513 Clean.doc

2

Township of East Goshen, PA - Archive 2012-12-18

Page 1 of 3

[Logo] General Code eCode360 with MultiViewTechnology

This electronic version is provided for informational purposes only. For the official version please contact the municipality.

Township of East Goshen, PA - Archive 2012-12-18

Chapter 169. PEDDLING AND SOLICITING

[HISTORY: Adopted by the Board of Supervisors of the Township of East Goshen 2-15-1994 by Ord. No. 104. Amendments noted where applicable.]

§ 169-1. License required.

From and after the effective date hereof it shall be unlawful for any person who is not the holder of a valid and unexpired license issued pursuant to this chapter to engage in selling, purchasing or soliciting the sale or purchase of food, printed matter, services, goods, wares or merchandise of any description, or in soliciting contributions, gifts or pledges of money or any other thing of value, by visitation to private homes or residences or on the public streets or highways of East Goshen Township.

§ 169-2. Application.

Any person desiring to obtain a license to engage in the activities described in § 169-1 hereof shall make application therefor, in person, to the Township Secretary.

A. The applicant shall supply, over his/her (hereinafter "his") signature, the following information:

  • (1) His name.
  • (2) His place and date of birth.
  • (3) His temporary address and telephone number.
  • (4) His permanent residence address and permanent telephone number.
  • (5) The address at which he will receive notices issued pursuant to this chapter.
  • (6) The name, address and permanent telephone number of his employer or principal, if any, and the nature of the business activity thereof.
  • (7) The nature of the business or activity in which the applicant wishes to engage within the township.
  • (8) A statement as to whether the applicant has been convicted in any jurisdiction of any crime constituting a misdemeanor, felony or summary offense other than a traffic violation and, if so, the name of the jurisdiction and crime(s) or offense(s) of which convicted.

[Handwritten: SECTION 1 with arrow]

B. Upon submission of the application, and the payment of a fee as set forth from time to time by resolution of the Board of Supervisors, the Township Secretary shall forward a copy of the application to an approved background check service which shall, within 48 hours, determine and report to the Township Secretary whether the applicant has ever been convicted of a crime constituting a misdemeanor, felony or a summary offense other than a traffic violation under the laws of any jurisdiction, together with such additional information relating thereto as may be disseminated by the Police Department. In the event that no record of such conviction is found, the Township Secretary shall issue a license in the form of a card which may contain the photograph of the applicant and which shall, unless revoked, entitle the applicant as the licensee to engage in the business or activity

[Handwritten: SECTION 2 with arrow]

file:///C:/Users/rick/AppData/Roaming/General%20Code/Township%20of%20East%20Go... 4/25/2013

Township of East Goshen, PA - Archive 2012-12-18

Page 2 of 3

specified on the application for a period of one year from the date of issuance. The Township Secretary is authorized to reject the application of any applicant previously convicted of a misdemeanor or felony criminal offense or a nontraffic summary offense. [Amended 12-6-2005 by Ord. No. 129-J-05]

C. Licenses may be renewed annually, by the licensee, upon payment of the fee herein above provided for, amendment of the original application to reflect any changes necessary in the information therein contained, and determination by the Police Department that the applicant has not in the interim period been convicted of any crime amounting to a misdemeanor or felony in any jurisdiction.

D. The Township Secretary is also authorized to deny renewal of any license previously issued to the applicant if he determines that the licensee has failed to comply with the standards of conduct established by § 169-3 or upon determination that the licensee has made any material false statement in his application for a license hereunder.

§ 169-3. Rules of conduct.

Every person to whom a license has been issued herein shall, in the carrying on of his business or activities in the township, comply with the following rules of conduct:

[Handwritten: SECTION 3] A. He shall carry his license card at all times and exhibit it upon request to any peace officer or any person upon whom he shall call or with whom he shall talk in carrying on his licensed activities.

B. He shall not permit any other person to have possession of his license card and shall immediately report its loss to the Township Secretary. He shall not cause or permit his license card to be altered or defaced.

C. He shall not enter, or attempt to enter, any dwelling house without invitation or permission of the occupant and shall immediately leave any premises upon request.

D. He shall not represent his license card to be an endorsement of himself or of his goods or services or of the goods or services of his principal or employer.

[Handwritten: SECTION 4] E. He shall immediately surrender his license card upon revocation of his license as hereinafter provided.

§ 169-4. Revocation.

Any license hereafter issued may be revoked by the Township Secretary upon the failure of the licensee to comply with the standards of conduct established by § 169-3 hereof or upon ascertainment that the licensee has made any false statement in his application for license hereunder. Notice or revocation shall be given, by written notice, personally served or sent by registered mail, to the address designated for this purpose in the application for license.

§ 169-5. Appeals.

Any person who has been refused a license by the Township Secretary or denied renewal thereof or any person whose license has been revoked shall be entitled to appeal to the East Goshen Township Board of Supervisors at a regular or special meeting for issuance or reinstatement of a license. The Board of Supervisors shall determine whether there exists substantial grounds under the provisions of this chapter to sustain denial or revocation of, or refusal to reissue, a license. In any such proceeding, the Township Secretary shall have the initial burden to establish the basis for his determination, and the applicant shall then have the burden to show why the Secretary's determination should not be affirmed. Proceedings shall be governed by the Pennsylvania Local Agency Law.

§ 169-6. Exemptions.

The following persons are exempted from payment of the license fee otherwise required by § 169-2.

file:///C:/Users/rick/AppData/Roaming/General%20Code/Township%20of%20East%20Go... 4/25/2013

Township of East Goshen, PA - Archive 2012-12-18 Page 3 of 3

  • A. Persons soliciting contributions on behalf of charitable organizations exempted from the provisions of or duly registered pursuant to the Solicitation of Funds for Charitable Purposes Act, Act of December 19, 1990, P.L. 1200 No. 202, 10 P.S. § 162.1 et seq., as amended.
  • B. Farmers engaged in selling only the produce of their own farms from a truck or other vehicle.
  • C. Persons who are currently licensed by the Commonwealth of Pennsylvania to engage in an activity specified in § 169-1 hereof, when so engaged, including, without limitation, real estate, insurance or securities salesmen/brokers.
  • D. Persons engaged in the sale of goods, wares and merchandise donated by the owner thereof, the proceeds whereof are to be applied to any charitable or philanthropic purpose. Editor's Note: Former Subsection 6(e), which immediately followed this subsection and exempted honorably discharged and disabled soldiers, was deleted 12-1-1998 by Ord. No. 129.

§ 169-7. Violations and penalties.

[Amended 5-7-1996 by Ord. No. 112] Any person who violates or permits the violation of any provision of this chapter shall, upon being found liable therefor in a civil enforcement proceeding commenced by the township before a District Justice, pay a fine for each such violation in an amount not less than $100 and not more than $600 plus all court costs, including reasonable attorneys fees, incurred by the township. No judgment shall be imposed until the date of the determination of a violation by the District Justice. If the defendant neither pays nor timely appeals the judgment, the township may enforce the judgment pursuant to the applicable rules of civil procedure.

file:///C:/Users/rick/AppData/Roaming/General%20Code/Township%20of%20East%20Go... 4/25/2013

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: May 3, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Milltown Dam Spillway Repair Project

We opened bids on April 30 for the Milltown Dam Spillway repair project. The results are as follows.

JMC Contractors, Inc. 38 Stephen Drive Glen Mills, PA 19342 $33,220.00
MARA Restoration Inc. 112 Lorraine Ave Oreland, PA 19075 $48,512.00

The Township Engineer is currently reviewing the bid submissions and I will have a recommendation for you at the meeting on Tuesday night.

F:\Data\Shared Data\Public Works Dept\Bids\Milltown Dam 2013\Memo re results 050313.docx

Rick Smith

From: Dan Malloy <dmalloy@yerkes-assoc.com>
Sent: Tuesday, April 30, 2013 10:51 AM
To: Rick Smith
Cc: 'Mark Miller'
Subject: Milltown Dam
Attachments: Milltown Dam Bid Results.xls

Rick,

It looks like we received two bids. Enclosed are the bid results. However, the low bid is $33,220.00.

I'll review the bid documents submitted with each bid and let you know their status.

Dan

1

eBid eXchange Export
Solicitatio: Chester County Milltown Dam Spillway Repair Project
Generated 4/30/2013 10:39:52 AM Eastern JMC

Line Item Descriptio Type Unit of Me Quantity Unit Price Extended Bid Comment
1 Mobilizati ADD LS 1 1200 $1,200.00
2 Erosion co ADD LS 1 2745 $2,745.00
3 Prep Appl ADD LS 1 2400 $24,000.00
4 Final Grad ADD LS 1 3475 $3,475.00
5 Removal o ADD LS 1 1800 $1,800.00
$33,220.00

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: May 2, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Geothermal Engineering RFP

We received 10 responses to our RFP for Geothermal Engineering. After review I would recommend that we accept the proposal from Alderson Engineering in the amount of $35,200

They have designed numerous (50+) geothermal systems, including systems for Easttown Township, West Bradford Township, New Garden Township, Widener University (5 systems) and West Chester University.

They do not anticipate a need to drill a test well. If we did want to drill a test well and do conductivity test the cost would increase $9-$14,000 which includes $2,500 for the conductivity test costs.

The test well would become part of the geothermal system so it is essentially a question of whether you pay for drilling one of the wells during the design phase or during the construction phase of the project.

They estimate it will take 90 working days to have a bid package.

Suggested motion: I move that we accept the proposal for Alderson Engineering in the amount of $35,200.

F:\Data\Shared Data\Public Works Dept\Buildings\Twp. Bldg. 1580 Paoli Pike\HVAC\GEO Thermal Design and Bidding\Memo to BoS 050213.docx

ALDERSON ENGINEERING, INC.
CONSULTING ENGINEERS

April 5, 2013

East Goshen Township
1580 Paoli Pike
West Chester PA 19380

SENT VIA E-MAIL

Att: Mr. Rick Smith; Township Manager
Re: East Goshen Township Building / Geothermal Engineering Proposal

Dear Mr. Smith;

As per your Request For Proposal (RFP), Alderson Engineering, Inc. is pleased to offer the attached proposal in conjunction with the replacement of the existing HVAC system with a new Geothermal HVAC system at the East Goshen Township Building, 1580 Paoli Pike, West Chester, PA. The project is described as follows:

Description Area (SF) Estimated Equipment Load (Tons)
Basement 4,200 10
1st Floor 4,200 20
2nd Floor 4,200 20
Total 12,600 50

If there are any questions, or if we can be of any further service, please contact our office.

Sincerely,

Howard Alderson, P.E.
Alderson Engineering, Inc.

Encl.

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Scope of Work

PHASE 1 - Life Cycle Cost Analysis
Review of Utility Bills to determine load profile of electrical power and fossil fuel.
Preparation of computer heat loss/gain calculations, including heat load evaluation of internal heat gain.
Evaluation of the following alternative HVAC and energy systems:
1. New Geothermal WSHP system with electric air conditioning and heating. Outside air via rooftop air/air heat recovery unit(s) and water/water GWSHP for heat recovery. Electric resistance heat for "heating only" areas (such as stair towers). DDC Energy Management System. Possible use of existing boiler and cooling tower in a "Hybrid" configuration.
Preparation of electrical load profile including monthly electrical demand (kW) and monthly electrical consumption (kWh) for each system. Data to be presented in graphical form.
Preparation of 20 Year Life Cycle Cost Analysis including estimate of construction cost, operating cost, and maintenance cost of alternative systems.
Recommendations for implementing report findings.
Phase 1 Deliverables:
• Provide (3) copies of the final report to the Owner.
• Attend (1) Public Meeting to present the report, answer questions, and discuss any aspect of the report.
PHASE 2 - Geothermal HVAC System Design
Demolition Plans. Pump Selection.
Geothermal Design. Geothermal System Piping and Insulation.
Geothermal Water Source Heat Pump Equipment Selection. Underground Piping Vault (where applicable).
Geothermal Piping Manifold Design. 20+ Year computer thermal models.
Geothermal HVAC System Specifications. Electrical Power modifications to accommodate new HVAC equipment.
Ventilation System design to meet code requirements.

Engineering Proposal / Page 2 of 7

407 Lakeside Drive • Southampton, PA 18966 • (215) 364-5635 • www.aldersonengineering.com

Design Services

Phase 1 - Preliminary Design Phase
  • (1) Meeting with the Owner to review, evaluate, and refine the scope of the construction project and the level of quality intended.
  • Examine existing site and existing conditions.
  • Preparation of 20-Year Life Cycle Cost Analysis.
  • Prepare a schematic design showing geothermal plans and drilling requirements.
  • Identify the Local and State code requirements and approval processes.
  • Prepare a project schedule, identifying milestones, completion dates, and long lead items.
Phase 2 - Construction Document Phase
  • Following the approval of the selected design options by the Owner, we will prepare construction drawings and specifications, which the full intent of the design is conveyed to the contractors responsible for executing the work.
  • Provide coordination between civil elements and utility work.
  • Meet with the Code Officials to have the design reviewed (as req'd).
  • Review the documents to determine the construction feasibility of the project.
Phase 2 - Bidding Phase
  • Preparation of plans and specifications for bidding.
  • Provide Internal administration as it relates to answering questions generated by the bidders.
  • Assist in evaluating the bids received, and make recommendations to the Owner.
  • (1) Pre-Bid meeting to familiarize the bidders with the project and to answer questions.
  • Filing of plans and specifications with pennbid.net.
Phase 3 - Construction Administration Phase
  • Three (3) sets of plans will be sealed for permits.
  • Review of Value Engineering suggestions offered by contractors.
  • Provide interpretation of construction documents and answer questions from contractors.
  • Review of shop drawings and submittals in a timely fashion.
  • Review of contractor's Request for Payment.
  • Visits to the construction site for meetings, inspection, preparation of punch lists, or assistance at start-up totaling (6) visits.
  • Assist in the commissioning and acceptance of the system.

Engineering Proposal / Page 3 of 7

407 Lakeside Drive • Southampton, PA 18966 • (215) 364-5635 • www.aldersonengineering.com

Fees

Basic Services
Phase (%) Fee (USD)
PHASE 1 25% $8,800
PHASE 2 60% $21,120
PHASE 3 15% $5,280
Total 100% $35,200

The Fee shall be due upon monthly progress billing. Interest at the rate of 1.5% per month on the unpaid balance will be added to the account for all bills aged longer than Thirty (30) days.

Optional Services #1 (ADD)
Additional Public Meetings (cost per meeting) $700.00
Additional Services
Personnel 2013 Hourly Rate
Principal $235
Project Manager $175
Project Engineer $175
Designer $175
Draftsman $145
Administrative $115
Field Representative $175

Reimbursable expenses shall be furnished in accordance with the A.I.A. Manual of Professional Services and shall utilize the following rates:

Reimbursable Expenses
Item Cost
Cadd Plots or Blueprints $5.00
Photocopies (8-1/2 x 11) $0.12
Travel per Mile $0.50
Airfare, Hotel, Misc. Travel Expenses At Cost
Federal Express $30.00

Engineering Proposal / Page 4 of 7

407 Lakeside Drive • Southampton, PA 18966 • (215) 364-5635 • www.aldersonengineering.com

Terms and Conditions

Estimated Time for Completion

We estimate that the preparation of the Phase 1 and Phase 2 will take Ninety (90) working days from receipt of mobilization fee and signed acceptance of proposal. To accomplish this, we will depend on your firm for the following:

  1. Cooperation of your personnel and consultants in supplying design documents and any other pertinent information that we request on a timely basis.
  2. The availability of the project management and team for the discussion of the design criteria.

Delay or failure to perform on time or in full because of inability to obtain requested information on a timely basis, or any delay beyond our control shall excuse us from the agreed upon completion date.

Insurance

Alderson Engineering, Inc. maintains insurance coverage in the indicated amounts for the following categories:

  • Professional Liability ............................................................................ $2,000,000.00
  • General Liability .................................................................................... $1,000,000.00
  • Workman's Compensation ..................................................................... $100k / $500k

A Certificate of Insurance can be provided within ten (10) days of notification of contract award.

Work Not Included
Architectural services. The design of specialty systems (designed by other consultants) such as:
  • Security systems.
  • Computer systems.
  • Telephone/Data systems.
  • Sound systems.
  • Audio/visual systems.
  • Television Systems.
  • Irrigation systems.
  • Elevators.
  • Lightning Protection system.
  • Radon Mitigation System.
Civil Engineering or Site utilities.
Structural engineering.
Acoustical consultation.
Hazardous Materials consultation.
Fire Alarm Calculations including Riser Diagram and Battery & Voltage Drop Calculations (By Contractor).
No reproduction of plans or specifications (billed as a reimbursable expense). LEED™ or Energy Star calculations or completion of forms/templates.
Obtaining permits or payment of application fees from any municipality or utility. Design of Building Plumbing, Electrical, or Fire Protection systems (By Project Consulting Engineer).

Engineering Proposal / Page 5 of 7

407 Lakeside Drive • Southampton, PA 18966 • (215) 364-5635 • www.aldersonengineering.com

Acceptance of Proposal

REUSE OF PLANS - Under this proposal, AEI does not grant to any party the right to the reuse of the plans or specifications beyond the terms and conditions stipulated above. All documents prepared by AEI are owned by AEI and remain the property of AEI.

RISK ALLOCATION - The Authorized Representative below and Alderson Engineering, Inc. have discussed the risks, rewards and benefits of the project and Alderson Engineering, Inc. total fee for services. The risks have been allocated such that, to the fullest extent permitted by law, Alderson Engineering, Inc.'s total liability to your firm, the owner, Authorized Representative, or any third party for any and all injuries, claims, losses, expenses, damages, or claims expenses arising out of this agreement from any cause or causes, shall not exceed the total amount of the MPE & FP fees. Such causes include but are not limited to Alderson Engineering, Inc.'s negligence, errors, omissions, strict liability, breach of contract or breach of warranty.

DRILL CUTTINGS AND FLUIDS - The AUTHORIZED REPRESENTATIVE recognizes that, when it is known, assumed or suspected that hazardous materials exist beneath the surface of the project site, certain waste materials, such as drill cuttings and drilling fluids, should be handled as if contaminated. Accordingly, to protect human health and safety as well as the environment, AEI will appropriately contain and label such materials; will promptly inform the AUTHORIZED REPRESENTATIVE that such containerization and labeling has been performed, and will leave the containers on site for proper, lawful removal, transport and disposal by the AUTHORIZED REPRESENTATIVE. The AUTHORIZED REPRESENTATIVE waives any claim against AEI, and agrees to defend, indemnify and hold AEI harmless from any claim or liability for injury or loss which may arise as a result of the drill cuttings, drilling fluids or other assumedly hazardous materials being left on site after their containerization by AEI. The AUTHORIZED REPRESENTATIVE also agrees to compensate AEI for any time spent and expenses incurred by AEI in defense of any such claim, with such compensation to be based upon AEI's prevailing fee schedule and expense reimbursement policy.

AQUIFER CONTAMINATION - Subsurface sampling may result in unavoidable contamination of certain subsurface areas, as when a probe or boring device moves through a contaminated area, linking it to an aquifer, underground stream, or other hydrous body not previously contaminated and capable of spreading hazardous materials off-site. Because nothing can be done to eliminate the risk of such an occurrence, and because subsurface sampling is a necessary aspect of the work which AEI will perform on the AUTHORIZED REPRESENTATIVE'S benefit, the AUTHORIZED REPRESENTATIVE waives any claim against AEI and agrees to defend, indemnify and hold AEI harmless from any claim or liability for injury or loss which may arise as a result of alleged cross-contamination caused by sampling. The AUTHORIZED REPRESENTATIVE further agrees to compensate AEI for any time spent or expenses incurred by AEI in defense of any such claim, in accordance with AEI's prevailing fee schedule and expense reimbursement policy.

DISCOVERY OF UNANTICIPATED HAZARDOUS MATERIALS - Hazardous materials may exist where there is no reason to believe they could or should be present. AEI and the AUTHORIZED REPRESENTATIVE agree that the discovery of unanticipated hazardous materials constitutes a changed condition mandating a renegotiation of the scope of work or termination of services. AEI and the AUTHORIZED REPRESENTATIVE also agree that the discovery of unanticipated hazardous materials may make it necessary for AEI to take immediate measures to protect human health and safety, and/or the environment. AEI agrees to notify the AUTHORIZED REPRESENTATIVE as soon as practically possible should unanticipated hazardous materials or suspected hazardous materials be encountered. The AUTHORIZED REPRESENTATIVE encourages AEI to take any and all measures that in AEI's professional opinion are justified to preserve and protect the health and safety of AEI's personnel and the public, and/or the environment, and the AUTHORIZED REPRESENTATIVE agrees to compensate AEI for the additional cost of such work. In addition, the AUTHORIZED REPRESENTATIVE waives any claim against AEI, and agrees to indemnify, defend and hold AEI harmless from any claim or liability for injury or loss arising from AEI's encountering unanticipated hazardous materials or suspected hazardous materials. The AUTHORIZED REPRESENTATIVE also agrees to compensate AEI for any time spent and expenses incurred by AEI in defense of any such claim, with such compensation to be based upon AEI's prevailing fee schedule and expense reimbursement policy.

BURIED UTILITIES - The AUTHORIZED REPRESENTATIVE will furnish to AEI information identifying the type and location of utility lines and other man-made objects beneath the site's surface. AEI will take reasonable precautions to avoid damaging these man-made objects and will, prior to penetrating the site's surface, furnish to the AUTHORIZED REPRESENTATIVE a plan indicating the locations intended for these penetrations with respect to what AEI has been told are the locations of utilities and other man-made objects beneath the site's surface. The AUTHORIZED REPRESENTATIVE will approve the location of these penetrations prior to their being made and the AUTHORIZED REPRESENTATIVE will authorize AEI to proceed. The AUTHORIZED REPRESENTATIVE agrees to waive any claim against AEI and to defend, indemnify and hold AEI harmless from any claim or liability for injury or loss allegedly arising from AEI's damaging underground utilities or other man-made objects that were not called to AEI's attention or which were not properly located on plans furnished to AEI. The AUTHORIZED REPRESENTATIVE further agrees to compensate AEI for any time spent or expenses incurred by AEI in defense of any such claim, in accordance with AEI's prevailing fee schedule and expense reimbursement policy.

COLLECTION COSTS - In the event legal action is necessary to enforce the payment terms of this Agreement, AEI shall be entitled to collect from you any judgment or settlement sums due, plus reasonable attorneys' fees, court costs and other expenses incurred by AEI for such collection action and, in addition, the reasonable value of AEI's time and expenses spent for such collection action, computed according to AEI's prevailing fee schedule and expense policies.

Acceptance of Proposal

This proposal may be accepted by having an authorized representative sign below with the complete understanding of all of the terms and conditions stated herein. This proposal is valid for thirty (30) days from the date of ALDERSON ENGINEERING, INC.'S authorized signature below.

Approved By :

X ____________________________________
Howard Alderson, P.E.
ALDERSON ENGINEERING, INC.

April 5, 2013
Date

Accepted By:

X ____________________________________
Authorized Representative
East Goshen Township

____________________________________
Date

Engineering Proposal / Page 6 of 7

407 Lakeside Drive • Southampton, PA 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

Office Buildings
2501 Parkway, Reliance Insurance Company Corporate Headquarters; Philadelphia, PA. Chesterbrook Corporate Centers; The Fox Companies; Chesterbrook, PA. Astra/Merck Corporate Headquarters; 725 Chesterbrook Boulevard; Wayne, PA.
Int'l. Court III Office Building; Lester, PA. Merck & Co. Research Laboratories, 5- Sentry East; Blue Bell, PA One Presidential Boulevard; HVAC system replacement; Bala Cynwyd, PA
Environmental Consulting Service (ECS II), Eagleview Corporate Center; Exton, PA Nutri/System Corporation Headquarters; Blue Bell, PA. Westlakes Office Complex; Trammell Crow Company; Wayne, PA.
Plymouth Corporate Center; Plymouth Meeting, PA. Chemical Road Office Building, Plymouth Meeting, PA. Spring Garden Office Building; Phila PA.
The Millennium; Philadelphia, PA. Merck & Co., 10- Sentry East; Blue Bell, PA. Rockwood Office Park; Wilmington, De.
Seven Penn Center, Philadelphia, PA. Walnut Hill Plaza Office Building, PA. 1234 Locust Street, Philadelphia, PA.
Comcast Sportsnet Corporate Headquarters; Philadelphia, PA. Maple Shade Municipal Complex, Maple Shade, N.J. The Lippencott Building, 227 E. 6th Street, Phila PA.
PA. Department Of Environmental Resources; Pottsville, PA. David Cutler Group, 5- Sentry West; Blue Bell, PA. State Street Square; NJ Treasury Dept. Headquarters; Trenton, N.J.
Bank of Delaware Headquarters; Wilmington, DE. Wilmington Trust Bank Headquarters; Wilmington, DE. Marine Midland Bank Headquarters; Wilmington, DE.
One Rodney Square; Wilmington, DE. Federal Courthouse; Wilmington, DE. Littler Mendelson, LLP. Offices; Philadelphia, PA.
Wilmington Trust Bank Headquarters - 2000 Renovation; Wilmington, DE. Richards Layton & Finger, LLP. Offices; Wilmington, DE. Susquehanna International Group - Corporate Headquarters; Bala Cynwyd, PA.
TELERX, Inc. Corporate Headquarters; Horsham, PA. TELERX, Inc. Call Center; Horsham, PA. TELERX, Inc. Call Center; El Paso, TX.
TELERX, Inc. Call Center; Wilkes Barre, PA.
Historically Significant
Ker-Feal Residence & Museum; Chester County, PA. Historic Waynesboro Residence & Museum; Wayne, PA. Moland House; Warrington, PA.
Morven Museum; Princeton, N.J. * Sagamore Hotel; Lake George, N.Y. * Easttown Township Building; Easttown, PA. *
National Constitution Center; Philadelphia, PA. Carinwood Estate; Bryn Athyn, PA. Liberty Bell Complex; Philadelphia, PA.
American Philosophical Society, Philadelphia, PA. Beaumont at Bryn Mawr Estate House, Bryn Mawr, PA. * Blue Bell Tavern; Philadelphia, PA. *
Philadelphia Zoo Shop; Philadelphia, PA. * Paxton Residence; Buckingham, PA. Pierce College - College Hall; Philadelphia, PA.
Academy of Music; Philadelphia, PA. Wharf at Rivertown, Chester, PA. American Standard Building; Trenton, N.J.
Beth Sholom Synagogue; Abington, PA. Harold Prince Theater; Philadelphia, PA.

* - Indicates Geothermal HVAC System

Engineering Proposal – Part II / Page II-3 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

Multi-Family
American Hebrew Academy - Faculty Residences; Greensboro, N.C. Berkeley Apartments; College Park, MD. Executive House; Philadelphia, PA.
St. Anthony's Apartments, Phila PA. Wanamaker House; Philadelphia, PA. MPB Affordable Housing; Phila PA.
Southwark Low Income Housing Project; Phila PA * Olde Kensington Pavilion - Housing for the Elderly; Philadelphia, PA. North American Baptist Home for the Aged; Philadelphia, PA.
The Lofts at 17th and Callowhill; Phila PA. 1920 Chestnut Street – Mixed Use Occupancy, Phila PA. 1510 Chestnut Street – Mixed Use Occupancy, Phila PA
Waterside Villas; Hackensack, NJ Locust Club Condominiums; Philadelphia, PA 640 North Broad Street Apartments; Philadelphia, PA.
Naval Square – Toll Brothers, Philadelphia, PA. 1401 Walnut Street – K. Hovnanian, Philadelphia, PA York Square Condominiums; Philadelphia, PA.
Waterfront Square Condominiums; High Rise Bldgs #1 & #2; Philadelphia, PA. JFK Condominiums – Mixed Use Occupancy, Philadelphia, PA. Stiles Alumni Hall - Drexel University; Phila PA.
Grasselli Hall - Widener University; Chester, PA. * Sharples Hall - Widener University; Chester, PA. * West Chester University Student Housing; West Chester, PA. *
American Hebrew Academy - Student Residences; Greensboro, N.C.* Resident Hall - Bard College; Annandale-on-Hudson, NY. * Georgia Institute of Technology, 4th St. Housing; Atlanta, GA.*
Student Residences - St. Joseph's University; Bala Cynwyd, PA.

* - Indicates Geothermal HVAC System.

Engineering Proposal – Part II / Page II-4 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

Healthcare Facilities
Graduate Hospital; Philadelphia, PA.
  • Internal Medicine Renovation
  • Dept. of Neurology
  • Gastro-Intestinology Renovation
  • EtO Sterilization Facility
  • Cardiac Catheterization Lab
  • Animal Laboratory
  • City Avenue - MPE Systems Audit
  • Skilled Nursing Facility
  • Diagnostic Imagining Ctr; Bala Cynwyd, PA.
Albert Einstein Healthcare Foundation; Phila, PA.
  • Fluoroscopy Suite
  • MRI Upgrade; Jenkintown, PA.
  • PCHD - HVAC System
  • Pre-Admission Testing Facility
  • Boiler Facility ATC System Upgrade
  • Diagnostic Center; Philadelphia, PA.
Temple University Hospital; Philadelphia, PA
  • Sports Medicine Clinic; Philadelphia, PA.
  • Sports Medicine Clinic at Northeastern Hospital; Philadelphia, PA.
  • Diagnostic Center; Philadelphia, PA.
  • Diagnostic Center; Horsham, PA.
Belmont Psychiatric Hospital; Phila. PA.
  • Chiller Replacement
  • Cafeteria Renovation
  • Employee Locker Room Renovation
  • ECT Suite
  • Lobby Renovation
Presbyterian Hospital; Phila. PA.
  • Gastro-Intestinology Renovation
  • PACU
  • Domestic Water Pump Replacement
  • Psychiatric Seclusion Rooms
  • Scheie Eye Institute Lab Renovation
Mercy Health Systems
  • Mercy-Philadelphia Diagnostic Imaging Center; Philadelphia, PA.
  • Mercy-Fitzgerald Diagnostic Imaging Center; Lansdowne, PA.
  • Mercy-Community Diagnostic Imaging Center; Havertown, PA.
  • Mercy-Eastwick Diagnostic Imaging Center; Philadelphia, PA.
  • Mercy-Fitzgerald 290 Ton Chiller Replacement & HVAC system upgrades; Lansdowne, PA.
Lower Bucks Hospital - Sleep Disorder Clinic; Bristol, PA. Phila. Center for Human Development (PCHD), Albert Einstein Healthcare. Haverford Hospital - Fire Alarm System Upgrade; Havertown, PA.
Delaware Valley Memorial Hospital - Patient Wing Renovation; Drexel Hill, PA. Radiology Associates, LTD. - MRI Gradient Coil Ventilation, Elkins Park, PA Masonic Home of New Jersey, Burlington County, NJ
Franklin Hospital - Cardiac O.R.; Phila. PA. Arbor Glen CCRC; Bridgewater, NJ * Park Ridge Transitional Care Facility; Philadelphia, PA
Hillmont Endoscopy Clinic; Springhouse, PA. Beaumont at Bryn Mawr CCRC; Bryn Mawr, PA. * Wake Robin CCRC; Burlington VT. *
Rittenhouse Manor Care Center; Genesis Eldercare; Philadelphia, PA Croasdaile Village CCRC; Durham, NC Park Ridge Medical Office Bldg.; Philadelphia, PA
Golden Gate Assisted Living Facility; Assisted Living Center; Galloway Township, NJ Brandall Estates Nursing Home; Linwood, NJ NJ Heart Institute of Southern N.J. - Diagnostic Center; Cherry Hill, NJ
Lutheran Home at Seiders Hill Life Care; North Manheim Township, PA Neshaminy Manor Nursing Home; Doylestown, PA * Crozier Medical Center; Chester, PA

Engineering Proposal – Part II / Page II-5 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

Allegheny Hospital - AHERF Computer Facility; Bala Cynwyd, PA. Ambulatory Surgical Centers
  • Ft. Lee Surgi-Center; Ft. Lee, N.J.
  • Edison Surgi-Center; Edison, N.J.
  • Linden Surgi-Center; Linden, N.J.
  • Fairfield Surgi-Center; Fairfield, CT.
  • Somers Surgi-Center; Somers, N.Y.
  • Denville Surgi-Center, Edison, N.J.
  • Middlesex Surgi-Center, Middlesex, N.J.
  • Denville Surgi-Center, Denville, N.J.
  • Hillmont Surgi-Center, Willow Grove, PA
  • East Brunswick Surgi-Center, East Brunswick, N.J.
  • Cherry Hill Surgi-Center, Cherry Hill, N.J.
  • Rutherford Surgi-Center, Rutherford, N.J.
  • Wayne Surgi-Center, Wayne, N.J.
  • Sparta Surgi-Center, Sparta, N.J.
  • Basking Ridge Surgi-Center, Basking Ridge, N.J.
  • Linden Surgi-Center #2, Linden, N.J.
  • Hackettstown Surgi-Center, Hackettstown, N.J.
  • Hackensack Surgi-Center, Hackensack, N.J.
  • Vineland Surgi-Center, Vineland, N.J.
Whitehorse Village CCRC; Newtown Square, PA *
Rothman Medical Center; King of Prussia, PA. Newbridge on the Charles CCRC; Hebrew Senior Life; Cambridge, MA *
Delaware Valley Medical Center - Energy Audit; Langhorne, PA. Friedman Pediatric Ventilator Patient Nursing Home, Philadelphia, PA
Plymouth House - Pediatric Ventilator Wing; Plymouth Meeting, PA. Oxford Valley Medical Office Bldg.; Langhorne, PA.
Hamilton Hospital; Mercer Co., N.J.
  • Ambulatory Services Center.
  • Maternity Wing.
Montgomery County Medical Office Building; Montgomery County, PA.
Northeast Open MRI; Philadelphia, PA Kennedy Memorial Hospital Medical Office Building – Fire Alarm System; Turnersville, NJ.
Pennswood Village CCRC, Newtown, PA *
  • MPE Master Plan;
  • Geothermal HVAC System;
  • Boiler Replacement;
  • 2.5 MW Standby Generator;
  • 13.5 kV Site Electrical Distribution;
  • Nursing Wing Expansion;
  • Domestic Hot Water Upgrade;
American Cancer Society, New England Division HQ – Geothermal HVAC System; Framingham MA *
Masonic Village at Elizabethown – Ben Franklin Building; Elizabethtown, PA
Masonic Village at Elizabethtown – Washington-Roosevelt Building; Elizabethtown, PA
Masonic Village at Lafayette Hill – Common Area Renovations; Lafayette Hill, PA Masonic Village at Elizabethtown – Formal Gardens; Elizabethtown, PA
Masonic Village at Dallas – HVAC System Analysis; Dallas, PA Masonic Village at Elizabethtown – Club House & Buchanan Building; Elizabethtown, PA
Masonic Village at Sewickley – MPE & FP System; Sewickley, PA Masonic Village at Elizabethtown – Berks Building; Elizabethtown, PA
Masonic Village at Warminster – Building System Analysis; Warminster, PA Meadow Lakes CCRC – HVAC & Electrical System Replacement; Hightstown, N.J.

* - Indicates Geothermal HVAC System.

Engineering Proposal – Part II / Page II-6 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

Educational Facilities
Flemington - Raritan High School; Flemington, N.J. * Berlin Township School District; Berlin, N.J. * Art Institute of Philadelphia; Philadelphia, PA.
Hugh F. Boyd School; Seaside Heights, N.J. New Hope High School, New Hope, PA. Annenberg Research Institute; Philadelphia, PA.
St. Joseph's University Dormitory and Bridge; Philadelphia, PA. Stockton State College; Pomona, N.J. * Barnegat High School; Barnegat, N.J. *
Logan Township Elementary School; Logan Township, New Jersey Addition and Renovation to Clementon Elementary School, - Clementon, N.J. Allegany Community College; Beaver, PA. *
Rutgers University Library Renovation, New Brunswick, N.J. William Penn School District; Delaware County, PA. South River School District; South River, N.J.
Neff Sr. High School; Manheim Township, PA. * Middletown High School; Middletown, DE. * Bard College Dormitory Building; Annandale-on-Hudson, N.Y.
Quantico Dependent High School; Quantico, VA. * Deptford High School; Deptford, N.J. Brandywine Elementary School; Downingtown, PA.
Columbia Greene Community College; Hudson, N.Y. * Hainesport Elementary School; Hainesport, N.J. Vanderhayden Elementary School; Albany, N.Y. *
Clementon Elementary School Expansion; Clementon, N.J. Pedricktown Elementary School; Oldmans Township, N.J. * Chautauqua Middle School; Chautauqua Lake, N.Y. *
Jefferson Elementary School, Albany, N.Y. * Bayshore Middle School; Middletown, N.J.* Parkview Elementary School; Westville, N.J.
American Hebrew Academy; Greensboro, N.C.* Newark Central High School; Newark, N.J. * Newark Science Park High School; Newark, N.J. *
Long Branch Middle School; Long Branch, N.J. * Long Branch High School; Long Branch, N.J. * Abington School District, Abington, PA. *
Christopher Columbus Charter School; Philadelphia, PA. Drew Elementary School, Hightstown, N.J. * Edgewater Park Elementary School; Salem, N.J.
HMS School; Philadelphia, PA. Medford Elementary School; Medford, N.J. * Medford Elementary School; Medford, N.J. *
Medford Cranberry Pines Elementary School; Medford, N.J. * West End Elementary School; Woodbury, N.J. Clementon Elementary School Renovation; Clementon, N.J. *
Woodbury High School Renovation; Woodbury, N.J. * Woodbury School District HVAC Renovations; Woodbury, N.J. * Widener University; Chester, PA
  • Quick School of Business Administration *
  • Kirkbride Hall Renovation *
  • Kirkbride Hall Addition *
  • Grasselli Hall Renovation *
  • Residence Hall Dormitory *
  • Schwartz Physical Education Building Renovation

* - Indicates Geothermal HVAC System.

Engineering Proposal – Part II / Page II-7 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

Restaurants
Marabella's, City Line Avenue; Bala Cynwyd, PA. The Broadway Deli at the Bellevue; Philadelphia, PA. Baci Italiano Bistro; Philadelphia, PA.
Pizzeria Uno, Rittenhouse Square; Philadelphia, PA. Gourmet Restaurants at the Sagamore Hotel; Lake George, N.Y. TGI Friday's, Second & Locust streets; Philadelphia, PA.
Gourmet Restaurants at the Rittenhouse Hotel; Philadelphia, PA. Hillary's Ice Cream; Broadway Mall; Long Island, N.Y. Hillary's Ice Cream; Prince George Mall; Prince George County, VA.
Restaurants at the Crowne Plaza Hotel, LaGuardia Airport, N.Y. Various institutional kitchens at nursing homes, CCRC's, and dormitories. Victor's Club at the First Union Center; Philadelphia, PA.
VIP Banquet Center at the First Union Center; Philadelphia, PA. Red Bell Brew Pub at the First Union Center; Philadelphia, PA. Brew Pub at the United Center; Chicago, IL.
Red Bell Brew Pub at Reading Terminal; Philadelphia, PA. Red Bell Brew Pub at Philadelphia International Airport; Philadelphia, PA. Astra/Merck Corporate HQ Dining Facility; Wayne, PA.
Koch's Hot Dog Kiosk; 30th Street Station; Philadelphia, PA. Wolf's Food Market; Philadelphia, PA. Neshaminy Mall Food Court; Bensalem, PA.
Capital Grille; Philadelphia, PA. Nightclub at the Sagamore Hotel; Lake George, N.Y. The Courtside Club at the First Union Center, Philadelphia, PA.
Capital Grille; Chrysler Building; New York, NY. Plate; Cheltenham, PA Prime; 401 City Avenue; Bala Cynwyd, PA.
Capital Grille; International Mall; Tampa, FL. Capital Grille; Hilton Hotel; Indianapolis, IN. Public House; Dover Casino; Dover, DE.
Marabella's Restaurant; Dover Casino; Dover, DE. R2L @ Two Liberty; Philadelphia, PA. Cuba Libre @ Tropicana Hotel & Casino, Atlantic City, NJ.
Starr Commissary @ 677 North Broad Street; Philadelphia, PA. Starr - Square Burger; Philadelphia, PA.
Country Clubs
Philmont Country Club; Huntingdon Valley, PA. Green Valley Country Club; Whitemarsh, PA. Phoenixville Country Club; Phoenixville, PA.
Sagamore Hotel & Country Club; Lake George, N.Y. * Philadelphia Cricket Club; Philadelphia, PA. Rivercrest Clubhouse; Philadelphia, PA.
Pine Hill Country Club; Pine Hill, N.J.

* - Indicates Geothermal HVAC System.

Engineering Proposal – Part II / Page II-8 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

Representative Projects

LEED™ Design and Commissioning

La Comunidad Hispania
Kennett Square, PA

Services:
MEP Design / LEED™ Consultant

Construction Cost: $2,000,000

Pennswood Village
Newtown, PA

Services:
MEP Design / LEED™ Consultant

Construction Cost: $10,000,000

Kensington High School
Philadelphia, PA

Services:
MEP Design / LEED™ Consultant

Construction Cost: $42,000,000

Vertical Screen Head Quarters
Warminster, PA

Services:
MEP Design / LEED™ Consultant

Construction Cost: $15,000,000

Oxford Community Center
Oxford, MD

Services:
MEP Design / LEED™ Consultant

Construction Cost: $2,000,000

Erdy McHenry Offices
Philadelphia, PA

Services:
LEED™ Commissioning

Earthres Office Building
Pipersville, PA

Services:
MEP Design / LEED™ Consultant / LEED™ Commissioning

Construction Cost: $2,200,000

2nd & State Office Building
Harrisburg, PA

Services:
MEP Design / LEED™ Consultant / LEED™ Commissioning

Construction Cost: $10,000,000

Sabert Office Building
Sayreville, NJ

Services:
MEP Design / LEED™ Consultant

Construction Cost: $25,000,000

North Shore Community College
Danvers, PA

Services:
Geothermal Design

Construction Cost: $21,000,000

Kimpton Hotel Monaco
Philadelphia, PA

Services:
MEP Design / LEED™ Consultant

Construction Cost: $40,000,000

Bridesburg Elementary School
Philadelphia, PA

Services:
LEED™ Commissioning

Construction Cost: $25,000,000

Engineering Proposal – Part II / Page II-9 of II-18

407 Lakeside Drive • Southampton, PA. 18966 • (215) 364-5635 • www.aldersonengineering.com

GEOTHERMAL PROJECT EXAMPLES

AEI has extensive experience in designing geothermal HVAC systems and have successfully applied this technology to the following local township buildings:

  • Easttown Township Municipal Building; Easttown Township, PA.
  • West Bradford Township Building; West Bradford Township, PA.
  • Woolwich Township Municipal Building; Woolwich Township, NJ.
  • New Garden Township Municipal Building; Landesburg, PA.

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: May 3, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Second meeting in May

Our second meeting in May conflicts with the primary election. We have advertised meetings for the 2nd and 4th Tuesday of each month on an “as needed” basis, so you have a choice.

I would suggest that you tentatively plan on meeting on the fourth Tuesday (May, 28), with the caveat that it may be canceled unless there is some pressing item that the Board needs to act on, since you are schedule to meet a week later on June 4th.

May 2013

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31

F:\Data\Shared Data\ABC'S\Board of Supervisors\General\Memo re meeting 051313.docx

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
April 16, 2013
Draft Minutes

Present: Chairman Senya D. Isayeff, Vice-Chairman Carmen Battavio, Supervisors Marty Shane, Thom Clapper and Chuck Proctor. Also present were Township Manager Rick Smith and CFO Jon Altshul. ABC members in attendance were Erich Meyer (Park & Rec) and Susan Carty (Planning Commission).

Executive Session

The Board met in Executive Session from 6:30pm to 7:00pm to discuss a personnel matter.

Call to Order & Pledge of Allegiance

Senya called the meeting to order at 7:00pm and asked Mary McLoughlin of Willistown to lead everyone in the Pledge of Allegiance.

Moment of Silence

Carmen called for a moment of silence to remember the troops and the victims of the Boston bombings.

After the moment of silence, Senya read aloud a note from Newtown, Connecticut in thanks for the letters, stuffed bears and well wishes from the Township delivered to them by Carmen Battavio after their recent tragedy.

Recording of Meeting

No resident recorded the meeting.

Public Comment on Non-Agenda Items

Bill Howard, Line Road – Thanked all the first responders and firefighters who responded when his house burned down March 27. He was especially thankful to WEGO officer Angel Callahan who rescued his dogs.

Chairman’s Report

Senya announced that the Board met in Executive Session earlier this evening to discuss a personnel matter. He also announced there was no Comp Plan update for this evening. Senya thanked the volunteers who participated in Keep East Goshen Beautiful Day.

Malvern Fire Company Report for March 2013

Rick reported that Malvern assisted the Goshen Fire Company with two incidents in March.

Financial Report

Jon Altshul summarized the financial results for the first quarter of 2013. As of March 31, revenues were $331,571 over budget and expenses were $149,282 below budget, yielding a net

4/24/2013 April 16, 2013 BOS Minutes Page 1 of 1

result of $480,853. Marty stated that Jon is doing a great job for the Township and the financial results get better each month.

Liens

Per Tia Piccolo’s recommendation to file liens against two homeowners in arrears on their utility bills, Carmen moved for the staff to proceed and file the liens. Thom seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Spinelli Property at 143 Line Road, Willistown Township

Ms. Mary McLoughlin, Director of Parks & Recreation for Willistown Township, was present to discuss Willistown’s plans for the Spinelli property.

Senya noted that Willistown had notified East Goshen in advance that they would be unable to attend the April 2 meeting; however, due to a glitch with an email server Rick Smith did not receive the email until after the April 2 meeting was concluded.

Ms. McLoughlin began her presentation by reviewing a Site Context map showing the location of the parcel. The Spinelli property serves as a buffer to several Natural Lands Trust (NLT) properties which are PNDI sites. The Spinelli site itself is also potentially a PNDI site and Willistown plans to have it inventoried. Willistown’s purchase of the Spinelli property will create a potential for another 5+ miles of recreational trails. Willistown has applied to the State for a DCNR grant as outlined in her March 11 letter to Rick Smith. The condemned, burned-out home on the Spinelli property will be razed, an environmental cleanup will be conducted, and all old equipment will be removed. She noted that this is a Willistown project and has absolutely nothing to do with the Greater Chester Valley Soccer Association (GCVSA) and there will be no expansion of parking for the GCVSA.

Carmen asked if East Goshen could obtain a general outline of the enforcement measures (such as fines, towing, etc.) Willistown plans to use if people park at the Spinelli location for soccer events. Ms. McLoughlin stated that the property will serve as a trail head with approximately 5-10 parking spaces, and Willistown does not believe these spaces will be used for soccer events; however she said they would take the request under advisement.

Ms. McLoughlin said she had read the minutes from the last meeting and wanted to address a few of the issues that were raised by residents. One of them involved the Toll Brothers development. She said that particular development was allowed as part of a deal by Willistown, the Bryn Mawr Rehab and the NLT in compensation for allowing 108 other acres to be protected. Marty asked if the NLT has any restrictions on their properties that would prevent the GCVSA from expanding onto them. Ms. McLoughlin said it would be against the principles of the NLT to allow that, and furthermore there is a natural barrier (a stream) that would prevent it. Marty asked if there will be any restrictions placed on the Spinelli property to prevent Willistown from selling it and having it used to expand soccer parking. Ms. McLoughlin stated the Spinelli property will be Township park land and the deed language will restrict it for recreational use only. The 5-10 parking spaces will be gravel, and will probably be located in the small keyhole lot along Line Road. Willistown’s plans are to use the Spinelli property for

4/24/2013 April 16, 2013 BOS Minutes Page 2 of 2

park land; however it’s possible that if sold it could be used for 5 residences. Marty asked if Willistown plans it to be used for passive recreation only, and Ms. McLoughlin said that is the plan. She also noted that the keyhole lot where the Spinelli home is located is considered a separate lot that could possibly be developed (one home only) but that is unlikely. She stated that Willistown is retaining the right to use the northwest corner of the parcel as active park land in the future.

Marty said he is disappointed the Willistown Board of Supervisors does not notify East Goshen of matters while they are under consideration. It would be nice for East Goshen to be notified so that representatives from the Township and interested residents could attend, Willistown meetings and provide input on matters that impact them. In that respect, East Goshen’s relationship to Willistown differs from its relationships to all other adjoining townships. Ms. McLoughlin said she notified East Goshen as soon as Willistown knew the Spinelli deal was going to happen, but added she would pass along Marty’s sentiments to Willistown’s new Township manager.

Marty said at this stage East Goshen has no plans to install the Line Road trail that was part of the Applebrook plan, as the ADA requirements make the cost prohibitive. Therefore if Willistown is planning to make a trail connection to East Goshen Township Park from the Spinelli property, it will have to be done on the Willistown side of Line Road.

Public Comment: Chuck Halmer, Applebrook – Asked Ms. McLoughlin why her March 11 letter to Rick Smith stated that the purchase of the Spinelli property “will provide much needed public parking access from Line Road.” Ms. McLoughlin said the letter referred to parking for the trail head. He asked where East Goshen residents will be able to see documentation that there will be a maximum of 10 parking spaces. Ms. McLoughlin said there will be no specific documentation. He asked for confirmation that she had stated something could possibly be developed on the keyhole lot and that there are no restrictions on it. She said yes, as the grants would not apply to that lot. He asked if the parking spaces would be placed within the keyhole lot and she said probably, but Willistown is still looking into it. He asked if Willistown will come back to East Goshen once a plan has been created, and she said she would absolutely come back if she is invited. Senya stated that if Willistown comes back and shows the plan, it would be for information purposes only, and East Goshen would not have any input into it. Ms. McLoughlin then stated for the record that Willistown has not yet created a plan, and the 5-10 parking spaces are only an estimate. The land would be Township park land for Willistown to manage as they see best. She added that all comments made this evening would be taken back to Willistown. Mr. Halmer asked about Willistown’s timeline for the property and Ms. McLoughlin said she is not sure at this point, but does know that settlement is not until August.

Marty asked if Willistown’s purchase is contingent on them securing the grant, and Ms. McLoughlin said no.

Public Comment: Bill Gies, Applebrook – Asked why the keyhole lot cannot be committed for conservation. Ms. McLoughlin stated the keyhole is only 1.9 acres as opposed to the remainder of the parcel which is over 20 acres. Mr. Gies said he would like the entire property tied together.

4/24/2013 April 16, 2013 BOS Minutes Page 3 of 3

Public Comment: Charlotte Ferroni (Willistown resident) – Said she lives on Beams Lane, and she and her husband specifically purchased their property for its privacy and seclusion. She is concerned about having trails all around her home with people on them all the time.

Public Comment: Steve Arnold, Applebrook – Wanted to know why Willistown can’t use the existing Township property represented as site #4 on the Site Context Map for the trail head. It’s right next to the Spinelli property. Ms. McLoughlin stated site #4 is too wet to be used for parking. She noted there are many reasons Willistown is buying the property, not just for trail head parking. Mr. Arnold stated that Line Road is not straight as represented on the Site Context Map. He is concerned because the entrances to Applebrook and the Spinelli property are across from each other on a curve, which is an unsafe condition. Ms. McLoughlin said she would take that concern back to her Township supervisors and added that the map was created from an aerial of the location. Mr. Arnold said regardless, it’s still not an accurate map. Mr. Arnold expressed disappointment that Willistown had no plan to show what the property will look like. He would like the property closed off after dark with a chain or gate to prevent teenagers from using it for partying, etc. Ms. McLoughlin said she would also take that back to her Board of Supervisors. Mr. Arnold said he is concerned the property will be used for soccer event parking.

Public Comment: Dean Case, Applebrook – Said he would prefer the parking be located back in the interior of the parcel, and not along Line Road. Ms. McLoughlin said Willistown will look into that. He also stated that if a trail is going to be constructed on Line Road it should be on Willistown’s side of the street.

Public Comment: Patricia Carroll, Applebrook – Does not want the property to be used for soccer event parking. In addition, she is concerned that Willistown will come back to East Goshen in a few years to ask for expanded parking on the Spinelli property. She added that driving on Line Road is already dangerous and some drivers do not even stay on their side of the road.

Public Comment: Michael Devine, Chairman of the Open Space Review Board in Willistown – Said Willistown had to scramble to save this property once the price dropped and they were able to afford it. Willistown would like East Goshen’s support, and he and Mary McLoughlin will take all comments back to Willistown.

Public Comment: Bill Egan, Mill Creek – Encouraged the Board to support Willistown and also to build the Applebrook trail along Line Road.

Public Comment: Steve Arnold, Applebrook – Stated that if the parking area is going to be close to Line Road it should be screened with landscaping.

Public Comment: Annette Case, Applebrook – Said parking for soccer events is a problem - people have parked in Applebrook for soccer events and walked over to the fields. She wants the parking area to be bermed up and screened with landscaping.

Thom Clapper asked for clarification that one home could possibly be built on the keyhole lot and Ms. McLoughlin said yes, one on the keyhole and 4 or 5 homes on the balance. Thom asked

4/24/2013 April 16, 2013 BOS Minutes Page 4 of 4

for clarification that there are no restrictions on Willistown selling to a builder. Ms. McLoughlin said yes there are. The grant covenants will restrict residential development. For clarification, Thom recapped that there is a possibility of up to 10 parking spaces for the trail head and perhaps one home on the keyhole lot.

Public Comment: Michael Devine, Chairman of the Open Space Review Board in Willistown – Said the by-right is five cluster homes, not five individual homes.

Marty asked why Willistown would not put restrictions on the keyhole lot and Ms. McLoughlin said she was not sure and could not speak for her Board of Supervisors. Marty said he’s in support of Willistown’s plans but he wants a conservation easement on the entire property, either on both parcels or by combining both parcels into one. Ms. McLoughlin said his request should be put in East Goshen’s letter to Willistown, which will then be passed on to the State. She added that Willistown is 100% confident the Spinelli property will remain park land.

Senya asked if East Goshen had been given a copy of Willistown’s grant application and Ms. McLoughlin said no. Senya said he would like to have a copy before East Goshen responds to Willistown. He then asked if Willistown’s Supervisors had any public meetings about this matter. Ms. McLoughlin said that all action taken in regard to this property was conducted at public meetings. She suggested Senya speak with David Burman, their Township Manager. Senya said it would have been helpful if the Comprehensive Plan citations in Willistown’s grant application letter had been from Willistown’s Comprehensive Plan instead of East Goshen’s Comprehensive Plan. Ms. McLoughlin stated that citations from the Willistown Comprehensive Plan were used in their actual grant application.

Marty asked Ms. McLoughlin if Willistown was asking for East Goshen’s support or merely for comments. Ms. McLoughlin said they were looking for either or both, and East Goshen can send a letter of support listing their caveats.

Senya asked what is Willistown’s timeline. Ms. McLoughlin answered that the grant is currently being reviewed by the State, and noted that Willistown was only required to notify East Goshen.

Thom asked what the amount of the grant request was. Ms. McLoughlin said it was $850K from the State and $500K from the County. In addition, $1.8M from their Open Space Fund will be used.

Public Comment: Annette Case, Applebrook – Requested that before the East Goshen Board supports this they unanimously agree to have the 1.9-acre keyhole lot be included in a conservation easement.

Marty moved to write a letter of support to Willistown with the following requests:

  1. A conservation easement is placed over both lots, OR the 1.9-acre lot is purchased only with money from the Open Space Fund.
  2. Parking is restricted to daylight hours.
  3. A copy of the grant application is provided to East Goshen.

4/24/2013 April 16, 2013 BOS Minutes Page 5 of 5

  1. A copy of the plan is provided to East Goshen before final adoption by the Willistown Board of Supervisors.
  2. The parking area is located as far back on the lot as possible.

Carmen seconded the motion.

Thom asked the audience if they had any concerns if a home is built on the keyhole lot. There were no comments. Ms. McLoughlin said the plan is not to have a house built there.

Public Comment: Michael Devine, Chairman of the Open Space Review Board in Willistown – Stated that in applying for the grant Willistown didn’t want to confuse the issue of having a property with a burned-out home, buried oil tanks and environmental issues mixed in with the 20-acre lot that’s in better condition. Willistown carved out the 1.9 acre portion to help ensure success in getting a grant for the rest of the property.

Rick Smith added for the record that Willistown is buying the 1.9-acre keyhole lot with Open Space Funds (bond money) and therefore they are not planning to “flip” it to a developer.

There was no further discussion or public comment. The Board voted unanimously to approve the motion.

Police Report

There were 564 calls for service from East Goshen in March. Chief Brenda Bernot reported that the father and son arrested for hosting an underage drinking party in Bow Tree are schedule for a hearing on April 24. The Citizens’ Police Academy will be starting up again in September. More details will be forthcoming. The DEA National Take Back Initiative for expired and unwanted prescription drugs will take place at Giant on Boot Road April 27 from 10:00am to 2:00pm. She urged everyone to keep their car doors locked and to remove valuable from their cars or store them out of sight. Finally she reminded everyone to be wary of phone scams which are still a problem in the area.

Marty asked that the Monthly Activity Report show if missing individuals are found. He would also like the category for stolen and recovered vehicles to be reinstated. Chief Bernot said she would check into it.

Resolution 13-12, Establishing the 2013 Public Safety Boundaries

Rick noted this is the standard resolution sent to the County every year. This year it was delayed until Chief Bernot was hired so that her signature could be added to the document. Marty moved to adopt Resolution 13-12. Carmen seconded the motion. There was no discussion or public comment. The motion passed unanimously.

Goshen Fire Company Report

The Fire Police responded to 38 calls for service and the EMS crew responded to 278 calls for service during the month of March.

4/24/2013 April 16, 2013 BOS Minutes Page 6 of 6

Financial Planning Session

The Board scheduled a Financial Planning Session for June 5 at 10:00am.

Review of Minutes

The Board reviewed and corrected the draft minutes of April 2. Senya stated the minutes would stand as corrected.

Treasurer’s Report & Expenditure Register Report

See attached Treasurer’s Report for April 11, 2013.
The Board reviewed the Treasurer’s Report and the current invoices. Thom moved to accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Chuck seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Action List

Applebrook Golf Outing – A meeting with Applebrook is pending.
Light Fixtures – A notice to proceed will be issued this week.
Municipal Authority Projects –
Lockwood – need to do final restoration in 2013.
Marydell – under construction.
Reserve Pump Station – need easement.
Hershey Mill Pump Station – work to begin this month.
Quarterly Report on I&I – Public Works cleaned and TV’d Pin Oaks, North Lockwood, Brook Drive and Strasburg Road. They made four repairs and continued monitoring with portable flow meters and normal cap replacements.
Quarterly Review of Right-To-Know Requests – The report was included in the Board’s packet and there were no comments.
Comcast Franchise – The Township Solicitor will work with Comcast on the agreement.

Any Other Matter

None.

Correspondence & Reports of Importance

Senya acknowledged receipt of a letter from Frank Vattilano changing the effective date of his retirement to December 31, 2013.

Meetings & Dates of Importance

Senya noted the upcoming meetings as listed in the agenda. Thom announced that the Farmers’ Market will return to the outdoors beginning in May. Chuck noted that on May 14 the Friends of East Goshen will have a meeting.

Public Comment

None.

4/24/2013 April 16, 2013 BOS Minutes Page 7 of 7

Adjournment

There being no further business, the regular meeting was adjourned at 9:08pm.

Executive Session

The Board met in Executive Session until 10:00pm to discuss a personnel matter.

Anne Meddings
Recording Secretary
Attachments:
Treasurer’s Report

4/24/2013 April 16, 2013 BOS Minutes Page 8 of 8

April 11, 2013

TREASURER'S REPORT

2013 RECEIPTS AND BILLS

GENERAL FUND

Receipts Amount Expenditures Amount
Real Estate Tax $125,204.48 Accounts Payable $307,764.53
Earned Income Tax $17,300.00 Electronic Pmts:
Local Service Tax $4,400.00 Health Insurance $0.00
Transfer Tax $0.00 Credit Card $0.00
General Fund Interest Earned $1,073.82 Postage $0.00
Total Other Revenue $374,120.08 Debt Service $34,138.36
Payroll $83,000.00
Total Receipts: $522,098.38 Total Expenditures: $424,902.89

STATE LIQUID FUELS FUND

Receipts Amount Expenditures Amount
Receipts $363,305.89 Expenditures: $0.00
Interest Earned $0.00
Total State Liqud Fuels: $363,305.89

CAPITAL RESERVE

Receipts Amount Expenditures Amount
Interest Earned $780.70 Expenditures: $0.00

TRANSPORTATION FUND

Receipts Amount Expenditures Amount
Interest Earned $295.43 Expenditures: $0.00

SEWER OPERATING

Receipts Amount Expenditures Amount
Receipts $21,395.32 Accounts Payable $51,023.71
Interest Earned $123.46 Debt Service $29,774.67
Total Sewer: $21,518.78 Total Expenditures: $80,798.38

REFUSE

Receipts Amount Expenditures Amount
Receipts $6,879.71 Expenditures $64,608.23
Interest Earned $52.35
Total Refuse: $6,932.06

SEWER CAPITAL RESERVE

Receipts Amount Expenditures Amount
Interest Earned $230.80 Expenditures $0.00

EAST GOSHEN TOWNSHIP
ACTION LIST

# Item Date
New additions are in bold 7-May-13
DPW 07-02 Hershey's Mill Dam 7-May-13
ADM 13-02 Incentitive Plan 7-May-13
ADM 13-03 Picnic 7-May-13
ADM 12-05 Comp Plan 7-May-13
PCZ 12-01 Comp Plan Goals for ABCs 7-May-13
ADM 12-4 Applebrook Golf Outings 4-Jun-13
ADM 12-4 Light Fixtures at Municipal Complex 4-Jun-13
FIN 11-05 Quarterly Report Municipal Authority Projects 16-Jul-13
DPW 08-02 Quarterly Financial Reports 16-Jul-13
ADM 09-04 Quarterly Report on I&I 16-Jul-13
ADM 12-06 Quarterly Review of Right to Know Requests 16-Jul-13
ADM 13-01 Comcast Franchise Renewal 16-Jul-13

Action List 050713.xlsx 1

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Hershey's Mill Dam No: DPW 07-02
List Date: 5/22/2007 Completed Date:
Description: Bring Dam into compliance with DEP requirements or dispose of dam
Date Action
Note I have hidden the 2010 comments to save space
1/3/2011 Update from Neil DeReimer
2/1/2011 Update from Neil DeReimer
3/1/2011 Update tabled to 3/8
3/8/2011 Update from Neil DeReimer
3/24/2011 American Rivers/NOAH grant denied
4/5/2011 Update from Neil DeReimer
5/10/2011 Update from Neil DeReimer
6/7/2011 Update from Neil DeReimer
7/12/2011 Update from Neil DeReimer
8/9/2011 Update from Neil DeReimer
11/1/2011 Update from Neil DeReimer and see attached
12/6/2011 Update from Neil DeReimer
12/9/2011 Submited grant application to Americn Rivers (decision by 3/9/12)
1/3/2012 contacted PADEP about meeting
2/7/2012 Conference call with DEP scheduled for 2/2/12
3/7/2012 Contract with Walsh executed on 2/7. Status report attached
4/3/2012 Status report attached
5/1/2012 Status report attached
6/5/2012 Status report attached
7/3/2012 Status report attached
8/7/2012 Presentation to BoS. BoS agreed to send 1,000 foot letter and invite residents once rendering is done
10/2/2012 Presentation - Ok to send plans to DEP
11/13/2012 Plans sent to DEP
12/4/2012 Status Report attached
1/7/2013 Per DEP we should have comments on plans by mid January
2/5/2013 DEP advised that we need to submit for an NPDES permit and provide them with an O&M Manual. The engineer has submitted the NPDES Application and is preparing the O&M Manual
3/5/2013 Revised plans sent to DEP on 2/18
5/7/2013 Comment letter received. Engineer will re-submit next week.

F:\Data\Shared Data\ABC'S\Board of Supervisors\To Do Schedule\2013\DPW 07-02 Hershey's Mill Dam.xlsx

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Incentive Plan No: ADM 13-2
List Date: 3/5/2013 Completed Date:
Description: Develop Incentive plan to acknowledge cost saving ideas
Date Action
4/2/2013 Work is in progress
5/7/2013 Work is in progress

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Picnic No: ADM 13-3
List Date: 3/5/2013 Completed Date:
Description: Have a picnic for employess, spouse, and supervisors
Date Action
4/2/2013 Work is in progress
5/7/2013 The original suggestion was to have an event at the Township Park and invite the employees and their spouses. An informal survey of the employees indicates that most spouses are employed and would not be able to attend. We would suggest going with a late lunch at the Township Building, with hamburgers and hotdogs for the employees only and the supervisors.

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Comp Plan No: PCZ 12-1
List Date: 2/7/2011 Completed Date:
Description: Update Com Plan
Date Action
2/7/2012 Consider applying for Vision Partnership Grant. At 2/7 meeting BoS requested Staff develop RFP for Consultant
3/20/2012 Working on RFP
4/17/2012 Working on RFP
5/15/2012 RFP Issued
6/19/2012 Contracted with Brandywine Conservancy on 6/5
7/17/2012 Working on grant application which is due 8/15/12
8/21/2012 VP Grant Application submitted 8/15/12
10/16/2012 CCPC recommended grant for approval
1/15/2013 Contract executed. Memo on task force makeup in 1/15 agenda
2/19/2013 Comp Plan Task created. Kick off meeting scheduled for February 25. 2013
3/5/2013 Verbal Update on 2/25/13 meeting
5/7/2013 The public visioning session is scheduled for June 3,2013

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Comp Plan Goals for ABCs No: ADM 13-1
List Date: 2/5/2013 Completed Date:
Description: Have ABC's undertake specific goals from Comp Plan
Date Action
2/5/2013 BoS identified specific goals from Planning Session. Sen them and Comp Plan Goals to ABCs
5/7/2013 Goals received from Authoirity and Commerce. HC Goals attached.

Historical Commission

First Quarter Report on 2013 Goals:

1. Work with Chester County and the local townships to complete the state funded Battle of the Clouds project.

Quarter 1:

  • Chester County has assembled more than 16 local townships to work on this project – East Goshen will be one of the primary focus locations. Monica Close will be the leader on this project.
  • The Historic Commission had a consultant from Chester County visit at our March meeting to review our progress. He is very happy with what we have accomplished.
  • As of April 11 th , all target buildings and locations have been researched and submitted to the County. A few other locations will also be completed for our personal records, but we are done with the required research portion of the project.
  • We are now waiting for the other locations to complete their studies and for the County to begin it’s assembly of the submitted research.

2. Complete entry of all Blacksmith Shop and Plank House historic items into the township’s archival database.

Quarter 1:

  • A spread sheet has been created to replace the unusable program we attempted to use last year.
  • All items from the BSS have been captured on film and paper
  • No further cataloging with be done until the Living History Day (June 1 st ) and Town Talks/Village Walks program (July 25 th ) are complete.
  • We will then store all of the 19 th century artifacts currently in use, and return the Plank House and BSS to a presentation of the 18 th century. This change will allow us to review and catalogue both period collections.
  • We will then focus on completing data entry and valuation of the items during the 3 rd and 4 th Quarters.

Regards,
Chris Reardon, Chairperson
Historical Commission
April 12th, 2013

ANDREW E. DINNIMAN
STATE SENATOR
19TH DISTRICT

182 MAIN CAPITOL BUILDING
SENATE BOX 203019
HARRISBURG, PA 17120-3019
717-787-5709
FAX: 717-787-4384

ONE NORTH CHURCH STREET
WEST CHESTER, PA 19380-3006
610-692-2112
FAX: 610-436-1721

EMAIL: andy@pasenate.com
WEBSITE: www.senatordinniman.com

Senate of Pennsylvania

COMMITTEES
EDUCATION, MINORITY CHAIR
AGRICULTURE AND RURAL AFFAIRS
COMMUNICATIONS AND TECHNOLOGY
ENVIRONMENTAL RESOURCES AND ENERGY
POLICY
STATE GOVERNMENT

BEN FRANKLIN TECHNOLOGY DEVELOPMENT AUTHORITY
EDUCATION COMMISSION OF THE STATES
JOINT LEGISLATIVE CONSERVATION COMMITTEE
LIFE SCIENCES AND BIOTECHNOLOGY CAUCUS, CO-CHAIR
PENNSYLVANIA CHARITABLE NONPROFIT CAUCUS, CO-CHAIR
PENNSYLVANIA HIGHER EDUCATIONAL FACILITIES AUTHORITY
STATE BOARD OF EDUCATION
STATE PUBLIC SCHOOL BUILDING AUTHORITY

West Chester

April 15, 2013

RECEIVED APR 17 2013

Mr. Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Dear Rick,

It is my honor and privilege as your State Senator to inform you that East Goshen Township was recently awarded a State grant under the Recycling Performance Grant Program of Act 101 of 1988 through the Pennsylvania Department of Environmental Protection.

I was informed that this grant of $15,148 is based on over 1,581.3 tons of recycled material and the population of East Goshen Township. This is extremely significant and truly displays your dedication to protect the community for future generations. The Recycling Performance Grant Program provides an incentive to help Pennsylvania communities increase the amount of materials recovered through recycling. Please be aware that this grant is in addition to the funds that the Department of Environmental Protection already allocates to municipalities to maintain recycling programs.

If you have not already, you should receive a formal award notice from the Pennsylvania Department of Environmental Protection regarding your grant funding within the next few weeks. If you would like additional information or have any questions concerning your approved grant, please do not hesitate to contact me.

Sincerely,
Andrew E. Dinniman
Senator – 19th District

AED:dcv

Jeffrey Jones
202 Applebrook Drive
Malvern, PA 19355
April 11, 2013

RECEIVED
APR 15 2013
BY _________

Louis F. Smith, Jr.
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199

Dear Rick:

I want to make you aware of an outstanding response from East Goshen Township's Public Works department and convey my sincere gratitude to Mark Miller and his team for their immediate and effective response to an emergency sewer backup on Thursday, March 21, 2013.

I live at 202 Applebrook Drive in East Goshen Township where I built my home and have lived for the past 9 years. When the private sewer within Applebrook Carriage Homes backed up uncontrollably into my home and my plumber told me there was nothing he could do to stop it, I called the Public Works department with a pretty desperate cry for help!

From the minute Joanne Morgan answered my call and expressed an immediate sense of urgency, I experienced an incredible response and team effort that literally saved my home from substantial damage and gave me the confidence that our township is really there when you need them. This was the first time in 9 years that I needed to call the township with an incident, so that's a 100% successful response rate in my book.

Mark continued to follow up with me in the days following the incident to make sure everything was OK. I also received a caring and thoughtful response from Carmen Battavio who also had someone stop by my home that day and who personally came to my home the following week.

East Goshen Township and the Public Works department more than exceeded my expectations that day. They helped a resident in their time of need and did the right thing. I hope all residents in East Goshen Township know how lucky they are to have a premier organization at their service.

Again, my sincere thanks,

Jeffrey Jones
610-578-0160

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: April 30, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Sunoco Remediation Report

We received the 2013 first quarter report from Sunoco. They have pumped and treated 248,159 gallons of ground water during this reporting period and off the 24 test wells only 4 of them have a MTBE reading above 20 ug/l (State Limit). A complete copy of the report is available for review at the Township Building.

F:\Data\Shared Data\Property Management\53-4\53-4-2 (1431 Paoli Pike)\Sunoco\Memo to BOS 023013.doc

ENVIRONMENTAL ALLIANCE, INC.
• Engineering
• Remediation
• Consulting

April 25, 2013

Ms. Lauren Mapleton
Pennsylvania Department of Environmental Protection
Southeast Regional Office
2 East Main Street
Norristown, PA 19401

RECEIVED
APR 29 2013
BY _________

RE: REMEDIAL ACTION PROGRESS REPORT
SUNOCO STATION #0004-7969
1425 PAOLI PIKE
WEST CHESTER, PA
PADEP Facility ID No. 15-20353

Dear Ms. Mapleton:

Enclosed please find the Remedial Action Progress Report prepared by Environmental Alliance, Inc. (Alliance) on behalf of Sunoco, Inc. for the above referenced site. This report is based on PA Code Title 25 Chapter 245 Requirements and presents a summary of Site activities completed between January 1st and March 31st 2013, including results of the most recent groundwater sampling event conducted at this Site on January 23, 2012. Please feel free to contact me if you have any questions or comments regarding this project.

Sincerely,
ENVIRONMENTAL ALLIANCE, INC.
Christopher Thoeny, P.G. (PA #PG004864)
Project Geologist

Enclosure

c: Fiona Livingston – Sunoco, Inc. (R&M)
ICF International – T. Aubel (Claim #06-186)
Goodman Properties - Phil Gray – Phoenix GeoEnvironmental, LLC
Rick Smith – East Goshen Township

J:\EAI_files\PCG\Sun\2199_Paoli Pike\Reports\RAPR's\1Q13 RAPR\1Q13 RAPR-2199.doc

5341 Limestone Road Wilmington, DE 19808
302-234-4400 302-234-1535 Fax www.envalliance.com

Remedial Action Progress Report
First Quarter 2013

Sunoco Station # 0004-7969
1425 Paoli Pike
West Chester, PA

General Information

Sunoco Remediation Associate: Fiona Livingston
Consultant: Environmental Alliance, Inc. (Alliance)
5341 Limestone Road
Wilmington, DE 19808
Alliance Program Manager: Joe Rossi
Alliance Project Manager: Chris Thoeny
PADEP Case Manager: Lauren Mapleton – PADEP Southeast Regional Office
PADEP Facility ID#: 15-20353
County: Chester
Municipality: East Goshen Township

SITE OVERVIEW

  • The site is an active retail gasoline station and A-Plus convenience store.

SITE HISTORY

  • In July of 1989, Sunoco retained Groundwater and Environmental Services, Inc. (GES) to conduct a hydrogeologic investigation upon the acquisition of the Site. GES installed 4 monitoring wells along with collecting soil samples and an initial groundwater sampling event. Analytical results indicated the presence of total BTEX and total petroleum hydrocarbons (TPH) in the two samples that were located nearest the underground storage tank (UST) field.
  • In the fall of 1989, Sunoco upgraded the UST system onsite. Upgrade activities included: the removal of four 4,000 gallon steel USTs which were replaced with three 10,000 gallon fiberglass USTs and the removal of two 550 gallon heating and waste oil tanks that were replaced with two 275 gallon aboveground storage tanks (ASTs).
  • In December 1992 and January 1993, Sunoco completed service station upgrades, which included the abandonment of the on-site water supply well.
  • In January 1995, the Pennsylvania Department of Environmental Resources (PADER) issued a letter in which no further investigative activities were deemed necessary. Subsequently, all monitoring wells were abandoned by B. L. Myers on January 27, 1995.
  • In October 2006, Sunoco upgraded the dispensers and product piping at the Site. During upgrade activities contamination was detected beneath one of the dispensers and was confirmed through a grab soil sample. Benzene was detected above Pennsylvania

Page 1 of 5

ENVIRONMENTAL ALLIANCE, INC.

Department of Environmental Protection (PADEP) statewide health standard (SHS) and a notice of release (NOR) was submitted to the PADEP by Alliance on October 16, 2006.

  • On January 17 th and 18 th , 2007, Alliance conducted soil borings and the installation of four monitoring wells. The monitoring wells were sampled on February 6 th and April 25 th , 2007.
  • In August 2007, Alliance submitted a Site Characterization Report (SCR) to the PADEP. The SCR was disapproved based on further site characterization being needed.
  • On September 19 th and 20 th , 2007, Alliance installed an additional four monitoring wells to help further delineate any potential migration of contaminants of concern.
  • In accordance with a letter from the PADEP dated March 3, 2008 Alliance conducted an extensive well search, in which no drinking wells were identified between the Site and the closest down-gradient sensitive receptor, Ridley Creek.
  • On September 3, 2008, Alliance installed two offsite monitoring wells and one onsite monitoring well. The offsite wells (MW-9 and MW-10) were installed for further horizontal delineation of potential contaminants of concern. The onsite well (MW-7B) was installed for vertical delineation of potential contaminants of concern.
  • In December 2008, a slug test was performed on monitoring well MW-7B to calculate the hydraulic conductivity of the bedrock aquifer beneath the site.
  • On May 27 th and 28 th , 2009 Alliance installed three offsite deep monitoring wells (MW-9B, MW-10B, and MW-11B) and two onsite deep monitoring wells (MW-2B and MW-8B).
  • On November 3 rd through 5 th , 2009 Alliance installed three offsite monitoring wells (MW-12 through 14) and four offsite deep monitoring wells (MW-5B, MW-12B, MW-13B, and MW-14B).
  • On November 9, 2009, Alliance submitted a Status Report for Site Characterization to the PADEP.
  • On February 1, 2010, Alliance submitted a Site Characterization Report (SCR) to the PADEP selecting the Site Specific Standard (SSS) as the clean up standard for the site. The SCR was approved by the PADEP in a letter dated April 21, 2010.
  • On June 10, 2010, Alliance submitted a Remedial Action Plan (RAP) to the PADEP in which a groundwater pump and treat remediation system was selected as the remedial strategy for the site. The RAP was approved by the PADEP in a letter dated July 21, 2010.
  • Start up/shake down procedures for the groundwater remediation system were initiated on June 15, 2010. The permanent operation date for the groundwater remediation system is June 28, 2010.
  • Operation and Maintenance (O&M) of the remediation system has been ongoing since June 28, 2010.
  • On August 28, 2012, Alliance submitted a request to PADEP by e-mail on behalf of Sunoco, to modify the groundwater sampling plan during active remediation to a reduced list of wells. PADEP agreed to a reduced groundwater sampling plan per an August 28, 2012 e-mail. The following wells were removed from the quarterly groundwater sampling scope MW-2 & 2B; MW-5 & 5B; MW-9 & 9B; MW-10 & 10B; MW-13 &13B. All the wells will remain in place, secured with a water tight manhole and locking well plug (wells will not be abandoned). Once active pumping is ceased, the

Page 2 of 5

ENVIRONMENTAL ALLIANCE, INC.

wells will be returned to the sampling plan, or a modified sampling plan to meet post remediation monitoring needs will be developed in participation with PADEP.

  • A Notice of Intent (NOI) was submitted to PADEP on September 6, 2012, for renewal of the NPDES Permit, to continue operation of the remediation system. Coverage under the statewide permit was extended in letter from PADEP dated October 24, 2012.
  • On September 27 2012, Alliance installed a regenerative air blower at the Site to aid in sub-surface remediation. The blower was installed in the remediation shed, and tied into piping runs connected to MW-7B. The purpose of the blower is to provide additional hydraulic influence at well MW-7B and possibly extract hydrocarbon vapors from the de-watered bedrock surrounding MW-7B. All extracted vapors are passed through activated vapor-phase granular carbon prior to discharge to the atmosphere.

SITE INFORMATION

Well Specifications: Fourteen 2-inch diameter overburden monitoring wells (MW-1 through MW-14); Eight 2-inch diameter shallow bedrock wells (MW-2B, MW-5B, MW-9B, MW-10B, MW-11B, MW-12B, MW-13B, & MW-14B); Two 6-inch diameter deep wells (MW-7B, & MW-8B)
Geology: Soils consist of greenish gray and orange clay and micaceous silt underlain by Precambrian age, medium grained felsic gneiss. Depth to bedrock reported during drilling ranged from 20-feet (MW-14B) to 48-feet (MW-8B). Bedrock is gradationally overlain by a thick mantle of saprolite identified in most borings.
Groundwater Elevation: Overburden – 82.95 feet (MW-12) to 75.29 feet (MW-14)
Shallow Bedrock – 83.00 feet (MW-12B) to 75.28 feet (MW-14B)
Hydraulic Gradient: From April 10, 2012 (last sampling event under non-pumping conditions)
Shallow - 0.013 feet per foot to the northeast
Deep - 0.014 feet per foot to the northeast
Hydraulic Conductivity: 4.75 feet per day (shallow); 1.75 feet per day (deep)
Groundwater Sampling Frequency: Quarterly
Analytical Method: Benzene, Toluene, Ethylbenzene, Total Xylenes (BTEX), Methyl tertiary-butyl ether (MTBE), Isopropylbenzene, Naphthalene via Environmental Protection Agency (EPA) Method 8260B.
Soil Quality: Soil quality data from October 2006 dispenser sampling indicated Benzene above SHS at sample Disp/Line 2. Soil quality data from well installation in January 2007, indicated MTBE above SHS at MW-3 (11-12 feet).
Separate-Phase Hydrocarbons: Separate-phase hydrocarbons (SPH) have never been detected in the site monitoring wells.

Page 3 of 5

ENVIRONMENTAL ALLIANCE, INC.

RISK ASSESSMENT

Potentially Sensitive Receptors: There are 34 known wells identified by the Environmental Data Resources, Inc. radius report (utilizing the Federal and Pennsylvania well databases) within a 0.5-mile radius. The East Branch of Ridley Creek lies approximately 900 feet northeast of the site.
Closest Known Well: One Federal Public Supply well was identified within a one-half mile radius to the east of the site.
Municipal Water Supply: Aqua Pennsylvania, Inc.

SITE ACTIVITIES THIS REPORTING PERIOD

  • Liquid-level data was collected from thirteen shallow monitoring wells (MW- 1 through MW-5 and MW-7 through MW-14) and nine deep monitoring wells (MW-2B, MW-5B, and MW-8B through MW-14B) on January 23, 2013.
  • Additionally, on January 23, 2013 groundwater quality samples were collected from MW-1, MW-3, MW-4, MW-7, MW-7B, MW-11, MW-11B, MW-12, MW-12B, MW-14, and MW-14B (per reduced scope).
  • Maps depicting groundwater elevation and analytical data for the shallow (overburden) and deep (shallow bedrock) monitoring wells are included as Figures 1 and 2, respectively. Historical groundwater elevation and analytical data are summarized in Table 1. A copy of the laboratory results is included in Appendix A.
  • System operations and maintenance (O&M) visits were performed throughout the reporting period. Historical dissolved-phase hydrocarbon recovery data is summarized in Table 2. Groundwater system performance graphs are included as Appendix B.
  • System sampling was conducted in accordance with the National Pollutant Discharge Elimination System (NPDES) Permit for the Site. The system sampling analytical data is summarized in Table 3. Laboratory analytical reports from the system sampling are included as Appendix C.

REMEDIATION SYSTEM INFORMATION

  • Type of System: Vacuum Enhanced Groundwater Extraction (VEGE)
  • Permanent Operation Dates: Groundwater June 28, 2010 to present; SVE : September 27, 2012 to December 23, 2012; March 19, 2013 to present
  • Extraction Points: MW-1, MW-2, and MW-7B.
  • Extraction Points Utilized: MW-7B.
  • Recovery Equipment: Grundfos ES-7 Electric Submersible Pump & Gast R4 SVE blower
  • Liquid-Phase Treatment Equipment: GeoTech Lo-Profile Air Stripper, (2) 200 lb. liquid granular activated carbon (LGAC) vessels
  • Vapor-Phase Treatment Equipment: vapor-phase granular activated carbon
  • Groundwater Discharge Location: Storm Sewer
  • Gallons pumped and treated this Reporting Period: 248,159

Page 4 of 5

ENVIRONMENTAL ALLIANCE, INC.

RISK ASSESSMENT

Potentially Sensitive Receptors: There are 34 known wells identified by the Environmental Data Resources, Inc. radius report (utilizing the Federal and Pennsylvania well databases) within a 0.5-mile radius. The East Branch of Ridley Creek lies approximately 900 feet northeast of the site.
Closest Known Well: One Federal Public Supply well was identified within a one-half mile radius to the east of the site.
Municipal Water Supply: Aqua Pennsylvania, Inc.

SITE ACTIVITIES THIS REPORTING PERIOD

  • Liquid-level data was collected from thirteen shallow monitoring wells (MW- 1 through MW-5 and MW-7 through MW-14) and nine deep monitoring wells (MW-2B, MW-5B, and MW-8B through MW-14B) on January 23, 2013.
  • Additionally, on January 23, 2013 groundwater quality samples were collected from MW-1, MW-3, MW-4, MW-7, MW-7B, MW-11, MW-11B, MW-12, MW-12B, MW-14, and MW-14B (per reduced scope).
  • Maps depicting groundwater elevation and analytical data for the shallow (overburden) and deep (shallow bedrock) monitoring wells are included as Figures 1 and 2, respectively. Historical groundwater elevation and analytical data are summarized in Table 1. A copy of the laboratory results is included in Appendix A.
  • System operations and maintenance (O&M) visits were performed throughout the reporting period. Historical dissolved-phase hydrocarbon recovery data is summarized in Table 2. Groundwater system performance graphs are included as Appendix B.
  • System sampling was conducted in accordance with the National Pollutant Discharge Elimination System (NPDES) Permit for the Site. The system sampling analytical data is summarized in Table 3. Laboratory analytical reports from the system sampling are included as Appendix C.

REMEDIATION SYSTEM INFORMATION

  • Type of System: Vacuum Enhanced Groundwater Extraction (VEGE)
  • Permanent Operation Dates: Groundwater June 28, 2010 to present; SVE : September 27, 2012 to December 23, 2012; March 19, 2013 to present
  • Extraction Points: MW-1, MW-2, and MW-7B.
  • Extraction Points Utilized: MW-7B.
  • Recovery Equipment: Grundfos ES-7 Electric Submersible Pump & Gast R4 SVE blower
  • Liquid-Phase Treatment Equipment: GeoTech Lo-Profile Air Stripper, (2) 200 lb. liquid granular activated carbon (LGAC) vessels
  • Vapor-Phase Treatment Equipment: vapor-phase granular activated carbon
  • Groundwater Discharge Location: Storm Sewer
  • Gallons pumped and treated this Reporting Period: 248,159

Page 4 of 5

ENVIRONMENTAL ALLIANCE, INC.

  • Average Groundwater Recovery Rate this Reporting Period: 1.91 GPM
  • Total Groundwater Recovered through March 19, 2013: 1,962,556 gallons Totalizer replaced 12/5/12 at 1,714,261 gallons
  • Total Dissolved-Phase MTBE Recovered through March 19, 2013: 115.92 pounds

FUTURE SITE ACTIVITIES

  • Quarterly groundwater monitoring and sampling will continue using the August 28, 2012 revised sampling plan. The next sampling event is scheduled in April 2013.
  • Continue to operate and optimize the remediation system with regularly scheduled O&M visits (weekly visits to maintain operational efficiency and to prevent fouling of transfer pumps and other system components).
  • Continue to collect bi-monthly system samples and submit monthly Discharge Monitoring Reports (DMR) in accordance with the NPDES Permit.

ATTACHMENTS

Figure 1 Groundwater Analytical and Gradient Map - Overburden (Shallow) Wells January 23, 2013
Figure 2 Groundwater Analytical and Gradient Map - Shallow Bedrock (Deep) Wells January 23, 2013
Table 1 Groundwater Elevation Data and Analytical Summary
Table 2 Dissolved Phase Hydrocarbon Recovery Data
Table 3 System Analytical Summary
Appendix A Groundwater Sampling Laboratory Analytical Reports
Appendix B Groundwater System Performance Graphs
Appendix C System Sampling Laboratory Analytical Reports

Page 5 of 5

ENVIRONMENTAL ALLIANCE, INC.

Figure 1: Groundwater Analytical & Gradient Map - Overburden (Shallow) Wells, January 23, 2013, for Sunoco Facility #15-20353, 1425 Paoli Pike, West Chester, PA, East Goshen Township, Chester County. Prepared by Environmental Alliance, Inc.

Title Block:
Sunoco Facility #15-20353
1425 Paoli Pike West Chester, PA 19380
East Goshen Township, Chester County
Groundwater Analytical & Gradient Map
Overburden (Shallow) Wells
January 23, 2013
Designed By: JR | Drawn By: SKJ | Updated By: — | Approved By: [Signature] | Project No.: 2199 | Date: 02/26/13 | Figure No.: 1

Site Features & Streets: East Boot Road, Paoli Pike, Sunoco Building, Shed, Canopy, Dispensers, Tank Field, UST, Vegetation, Product Line, Edge of Pavement/Curb, Approximate Property Boundary.

Groundwater Elevation Contours: 77.00, 77.50, 78.00, 78.50, 79.00, 79.50, 80.00, 80.50, 81.00, 81.50, 82.00, 82.50.

Well Data:

  • MW-1: [80.90] B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: 3.7, I: < 1.0, Naph: < 2.0
  • MW-2: [80.60] NS
  • MW-2B
  • MW-3: [82.37] B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: < 1.0, I: < 1.0, Naph: < 2.0
  • MW-4: [81.94] B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: 186, I: < 1.0, Naph: < 2.0
  • MW-5: [81.38] NS
  • MW-5B
  • MW-6: [83.78] NS
  • MW-7: [77.14] B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: < 1.0, I: < 1.0, Naph: < 2.0
  • MW-7B
  • MW-8: [82.03] NS
  • MW-8B
  • MW-9: [81.12] NS
  • MW-9B
  • MW-10B
  • MW-11: [79.86] B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: 130, I: < 1.0, Naph: < 2.0
  • MW-11B
  • MW-12: [82.95] B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: < 1.0, I: < 1.0, Naph: < 2.0
  • MW-12B
  • MW-13: [81.03] NS
  • MW-13B

Sunoco Facility #15-20353 - Groundwater Analytical & Gradient Map - Shallow Bedrock (Deep) Wells

Groundwater analytical and gradient contour map (Figure No. 2, dated January 23, 2013) prepared by Environmental Alliance, Inc. for Sunoco Facility #15-20353 at 1425 Paoli Pike, West Chester, PA 19380, East Goshen Township, Chester County, showing monitoring well locations, groundwater elevation contours, site structures along East Boot Road, and analytical data callouts.

Title Block

  • Environmental Alliance, Inc., 5341 Limestone Road, Wilmington, DE 19808, Phone: (302) 234-4400 - Fax: (302) 234-1535
  • Sunoco Facility #15-20353, 1425 Paoli Pike, West Chester, PA 19380, East Goshen Township, Chester County
  • Groundwater Analytical & Gradient Map, Shallow Bedrock (Deep) Wells, January 23, 2013
  • DESIGNED BY: JR; DRAWN BY: SKJ; UPDATED BY: ---; FIGURE NO.: 2; PROJECT NO.: 2199; DATE: 02/26/13

Map Labels and Monitoring Wells

  • Site Features and Roads: East Boot Road, Shed, Sunoco, Canopy, Tank Field
  • Contour Elevations: 82, 80, 78, 76, 74, 72, 70, 68, 80
  • Monitoring Wells: MW-1, MW-2, MW-2B, MW-3, MW-4, MW-5, MW-5B, MW-6, MW-7, MW-7B, MW-8, MW-8B, MW-9, MW-9B, MW-11, MW-11B, MW-12, MW-12B, MW-13, MW-13B
  • MW-13B: [81.04], NS
  • MW-11B: [79.86], B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: 126, I: < 1.0, Naph: < 2.0
  • MW-5B: [82.63], NS
  • MW-2B: [80.55], NS
  • MW-8B: [82.25], NS
  • MW-9B: [81.23], NS
  • MW-12B: [83.00], B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: < 1.0, I: < 1.0, Naph: < 2.0
  • MW-7B: [64.81], B: < 1.0, T: < 1.0, E: < 1.0, X: < 3.0, MTBE: 3,760, I: < 1.0, Naph: < 2.0

Notes and Legend (Partially Cropped at Left Margin)

  • [illegible]s reported in [illegible]iter (µg/L).
  • [illegible] above specified detection limit
  • [illegible]d (per the October [illegible]ed sampling plan)
  • [illegible]evations are [illegible]n arbitrary site [illegible]0 feet.
  • [illegible]ed by Surfer 7 [illegible]g method
  • [illegible]evation data collected [illegible] conditions (MW-7B).
  • [illegible] in bold format are [illegible] of PA ACT 2 UA [illegible] Standards
  • [illegible]water Elevation
  • [illegible]rt-Butyl Ether, [illegible]zene, [illegible]ene
  • Legend: Bedrock Monitoring Well, [Overbu]rden Monitoring Well, Edge of Pavement/Curb, Approximate Property Boundary, Product Line, Building, Canopy, Dispenser, Tank Field, UST, Vegetation
  • eepGW-Grad1-13; Scale: 0; Source: Chester [illegible]

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 3, 2013

To: Board of Supervisors
From: Mark Miller
Re: Activity Report

We have been busy working on the sewer system looking for infiltration as well as cleaning the lines. We located several significant leaks; we located one on the interceptor line. We also found about 15 to 20,000 gallons a day while televising in Hunt Country.

The portable flow meters that we have been using on the system showed INI in the NW quadrant. Since the repair, flows have dropped eighty thousand gallons a day. (Pictures attached)

On May 6th thru the 8th we will be televising the Interceptor line from Wilson Drive to Westtown Way.

We excavated the dirt for the Amphitheater. The ball fields and the tennis courts were prepared for use. Soft fall material was installed thru the tot lot and exercise area.

F:\Data\Shared Data\Public Works Dept\Memos to BOS\Memo to BOS for Activity report May 3.docx

Photograph of a damaged sewer pipe inside a manhole with water spraying out of a failed joint connection.

Note label: Gasket blew out. Interceptor line

Photograph of a deep trench excavation showing an excavator bucket (CAT), a tall cylindrical concrete manhole structure, a ladder extending into the pit, and two workers wearing red hard hats and high-visibility yellow shirts working at the base of the manhole structure, with two handwritten yellow notes attached.

Excavation 21' x 30 x 30

Chas + Mike preparing to remove old gasket and install new one

Photograph of the deep excavation around the cylindrical concrete manhole structure showing three workers, dewatering pump hoses, and a large pipe, with a handwritten yellow note attached.

We had to use three 3" pumps to keep up with the water

Photograph of workers inside the excavation pit alongside the concrete manhole structure locating the sewer pipe.

Note label: Locating the pipe

Photograph of an outdoor construction area showing a grassy lawn in the foreground, a graded gravel and dirt area with wooden survey stakes, a pickup truck parked on the left, and trees in the background, with a handwritten yellow note attached.

Ampitheater

Photograph showing earth excavation and grading work marked by construction stakes in a large field for the amphitheater project, with construction equipment visible in the background.

Note label: Ampitheater

April 12, 2013

Mr. Senya D. Isayeff, Chairman
Board of Supervisors
East Goshen Township
1580 Paoli Pike
West Chesetr, PA 19380

Dear Mr. Isayeff,

Looks like we are heading down hill with all the signs, banners, and cars parked all over the place along route 3. Take a drive with the others Supervisors and appropriate township staff and see it firsthand.

It starts with the townships bright yellow advertisement for something going on for a market. It continues with signs at mikes on the pike, mid atlantics parking cars with advertisements at wiggins. Shredding signs outside of wiggins. Large banners at the car wash, advertisement outside of rose hill apartments. Mythos and swim club banners at the waterview apartments, lunch signs at sabatinos, banners at midas muffler. large banner at bob wagners flooring america. Let's not forget ultimate patio, yocum blinds advertisements. Hey, take at the bike store sign. Can't wait for everyone else to follow their lead.

It's time to start enforcing what is occurring.

RECEIVED
APR 17 2013
BY _________