Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, May 1, 2012
Board will meet in Executive Session at 6:00PM to conduct
ABC interviews and discuss ABC appointments.
Formal meeting will commence at 7:00pm
- Call to Order
- Pledge of Allegiance
- Moment of Silence – Supervisor Carmen Battavio
- Ask if Anyone is Recording the Meeting?
- Public Comment – Hearing of Residents (Optional)
- Chairman’s Report Announce that the Board met in executive session on April 17 on a personnel matter.
- Public Hearings
- Police/EMS Reports
- Financial Report
- Old Business Review Rec Program funding mechanism; Consider Liberty Towers paint sample
- New Business Consider Board’s position on Renzi, 219 Ellis Lane, application for dimensional variance; Consider Goshen Meadows Apartments request for Waiver for Historic Resource Impact Study; Consider Resolution Establishing Specific Date For Public Hearings; Announce appointments to Park & Recreation Commission; Consider June 14, 2012 for long range planning session; Consider RFP – Job Classification and Compensation Study and Analysis; Consider RFP for Planning Consultant; Consider Public Works Director’s recommendation on the sale of sewer cleaner
- Any Other Matter
- Approval of Minutes April 17, 2012
- Treasurer’s Report Report – April 26, 2012
- Review Action List
- Correspondence, Reports of Interest Request for Information Quarterly Summary
- Dates of Importance Date Event Time April 30, 2012 Commerce Development Commission w/s 7:00 PM May 1, 2012 Board of Supervisors – Renzi, 219 Ellis Lane 7:00 PM May 2, 2012 Pension Committee 1:00 PM
F:\Data\Shared Data\Agendas\Board of Supervisors\2012\05012012.doc
- Dates of Importance Date Event Time May 3, 2012 Planning Commission 7:00 PM Farmers Market – Outdoor season starts 3-7 PM May 5, 2012 Township Yard Sale - Rain date is May 6 9-1 PM May 9, 2012 Conservancy Board 7:00 PM May 10, 2012 Historical Commission 7:00 PM May 11-13, 2012 Goshen Fire Co – Mother’s Day Flower Sale Boot & Greenhill Rds. May 14, 2012 Municipal Authority – at Ridley Creek Plant 6:00 PM May 15, 2012 Board of Supervisors 7:00 PM May 18, 2012 Walk-in Youth Rec & Tennis Registration 9-11AM May 21, 2012 Applebrook Golf – Residents only outing May 21, 2012 Deer Committee 7:00 PM May 21, 2012 Commerce Development Commission 7:00 PM May 23, 2012 Friends of EGT 501c3 7:00 PM Zoning Hearing Board – Renzi, 219 Ellis Lane, DV 7:30 PM May 28, 2012 Offices Closed Memorial Day June 2, 2012 Historical Commission - Civil War Event Summer 2012 Newsletter: May 2, 2012 Article Due Date July 1, 2012 Website Posting Date
- Public Comment – Hearing of Residents
- Adjournment
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.
2
10a
April 26,2012
Activities generating fees report- Frank Vattilano
| Activity | Township keeps | Twp collects monies | Instructor collects monies | Location of Activity |
|---|---|---|---|---|
| Yoga | 15% of total fees | X | Twp bldg | |
| Zumba | 15% of total fees | X | Twp bldg | |
| Pilates | 15% of total fees | X | Twp bldg | |
| Meditation | 15% of total fees | X | Twp bldg | |
| Aerobics | Instructor paid per class | X | EG Elem | |
| Mature Driving Training | 22% of total fees | X | Twp bldg | |
| Soccer Clinics | $5 to $10 per student | X | EG Park | |
| Volleyball Clinic | $5 per student | X | EG Park | |
| Tennis Clinic | $300 flat fee for 3 weeks | X | EG Park | |
| Boot Camp Fitness Clinic | $150 fee per month | X | EG Park | |
| Senior Golf | 15% of total fees | X | Tee It Up Golf | |
| Fishing Clinic | No instructor fee | X | Twp bldg and a twp pond | |
| Applebrook Golf | All reg. fees to Applebrook | X | Applebrook Golf Club | |
| Youth Rec Camp | 100% of fees | X | EG Elementary | |
| Ice Skating for Tots | $5 per child | X | Ice Line Skate Rink | |
| Trips | $5 to $10 day trip $10 to $25 overngt |
X | NYC, Wash DC, Philadelphia, Baltimore, etc Cape Cod, Hudson Valley, Niagara Falls, etc |
F:\Data\Shared Data\Park & Rec Dept\General\Activities generating fees report docx april 26 2012.docx
10b
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 4/26/2012
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer [signature]
Re: Liberty Towers / Paint Samples
Dear Board Members:
Liberty has sent examples of the exact paint they propose to use for the Tower and their Land Planner has responded in writing about the paint color of the tower, I have include that information for your review. I will be present for your meeting to discuss this matter with you on Tuesday evening.
F:\Data\Shared Data\Admin Dept\WCF RFP 2011\Liberty Towers\Memo to BOS re. Paint Samples 04262012.docx
seidel planning & design
land use planning & consulting
1240 e. schuylkill road, pottstown, pa 19465
April 26, 2012
RECEIVED BY:
APR 26 2012
Via Hand Delivery
Mark A. Gordon
Director of Code Enforcement
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Building Permit Application for Liberty Towers, LLC (LT PA-504 / East Goshen)
1580 Paoli Pike, West Chester, PA
APN: 53-004-0077.010E
Response to review comments from Yerkes Associates & Cirilli Associates
Mr. Gordon,
We have received the review comments from Yerkes Associates and Cirilli Associates regarding the above referenced construction permit application and prepared revisions as requested. Six (6) sets of the following documents are submitted for your review and approval:
- Tower & foundation construction drawings including structural calculations (8.5"x11") prepared by Fred A. Nudd Corporation, revised April 24, 2012;
- Tower erection drawings for the Radome Cylinder (11"x17") prepared by Fred A. Nudd Corporation, dated April 24, 2012;
- A Geotechnical Report prepared by Advantage Engineers, revised April 23, 2012;
- A Tower Certification Letter prepared by Michael F. Plahovinsak, PE, indicating the proposed tower is designed to comply with the standards set by East Goshen Township and the International Building Code, dated April 24, 2012;
- A letter prepared by Michael F. Plahovinsak, PE addressing comments raised in the April 2, 2012 review letter prepared by Cirilli Associates, Inc., dated April 24, 2012;
- A copy of correspondence between East Goshen Township and the Pennsylvania Historic Museum Commission indicating support for the proposed tower design;
- Photographs of an existing white-painted communications tower provided by Seidel Planning & Design, dated April 26, 2012;
- Revised site construction drawings prepared by Advantage Engineers will be provided under separate cover.
The following comments are provided to address Yerkes Associates’ April 16, 2012 review of the site engineering drawings prepared by Advantage Engineers:
- The plans have been updated to identify all existing utilities within the proposed construction area and eliminate any potential conflicts;
- An erosion & sediment control plan identifying site access, limit of disturbance, construction sequence, and construction details has been included.
- The plans have been updated to illustrate the concrete curb around the perimeter of the leased area. A construction detail has also been added addressing how the proposed fence and brick columns will adjoin the curb;
- Spot elevations have been included to indicate grades and slope in the construction area. Depressed curb has been proposed where appropriate to facilitate drainage;
- The plans have been updated to depict the relocated light pole outside the proposed lease area and equipment compound. A light pole base construction detail has also been included;
telephone 610.323.8752 • facsimile 610.323.8753 • bseidel@seidelplanning.com • www.seidelplanning.com
1240 east schuylkill road • pottstown pennsylvania 19465
seidel planning & design
land use planning & consulting
1240 e. schuylkill road, pottstown, pa 19465
- An asphalt paving section detail has been added to the plans;
- A request was made to remove the proposed barbed wire from the chainlink fence and gate detail. As proposed, the equipment compound will be enclosed on four (4) sides by: The existing garage/ salt shed to the northeast;; Two (2) 8'-0" high proposed board-on-board fences with brick pillars to the northwest and southwest;; A proposed 7'-0" high chainlink fence and gate with an additional 1'-0" of barbed wire to the southeast;
The two (2) sides of the enclosure with board-on-board fence are proposed to be consistent with the surrounding buildings and structures visible to the general public and individuals utilizing the adjacent parking lot. The chainlink fence and gate is proposed to facilitate entry of both individuals and construction vehicles into the equipment compound, is located at the rear of the property, and will not be visible to the general public.
The proposed 8'-0" high board-on-board fences will be very difficult to climb due to their relatively smooth texture and finish, and visibility to the general public. Barbed wire is proposed for the chainlink fence as these type of fences are very easy to climb, and will screened from public view. As proposed, the barbed wire will not exceed the height of the other adjacent board-on-board fences, will not be visible to the general public, but will afford additional security and safety to the equipment compound. Liberty Towers respectfully requests the barbed wire as proposed, be permitted on the chainlink fence and gate.
In addition to the comments raised in the previously mentioned review letters, questions have been brought to our attention regarding the proposed color and gloss-finish of the tower.
As I am sure you are aware, this proposal has been reviewed and approved by the Pennsylvania Historical and Museum Commission. Substantial investigation including the preparation of photographic simulations was performed by Liberty Towers and provided to East Goshen Township and the State to illustrate a stealth-designed white tower, as proposed, would have no impact on the nearby Goshenville Historic District. These exhibits depicted a white painted tower which is generally accepted to be a neutral color in the landscape, and blends in well with the skyline.
A copy of a letter from the East Goshen Township Board of Supervisors to the Pennsylvania Historic Museum Commission, dated December 9, 2011 has been provided indicating the Township's support for the application based on incorporating measures to mitigate potential visual impacts including the white painted color of the tower. I have also included a copy of a photo simulation accompanying this correspondence to the State illustrating a white tower, and a copy of the correspondence ultimately received from the State indicating the application, as designed, will have no impact on the Goshenville Historic District. Approval and support for a white painted tower has been previously provided by both East Goshen Township and State offices, therefore Liberty Towers will be required to construct a white painted tower.
It is my understanding 'white' paint samples for the proposed tower were delivered to East Goshen Township directly from the tower manufacturer on April 24, 2012. The white color proposed for the tower is typical of other painted towers in the general area. For your reference, I have included photographs of a similar white painted tower located in Upper Pottsgrove Township, Montgomery County, Pennsylvania. Although this example depicts a tower stealth designed as a flagpole, it accurately reflects the color or the tower proposed in East Goshen Township and illustrates how the color blends into the surrounding skyline.
The tower will be painted with a gloss finish which is appropriate for a variety of reasons. A gloss finish is very hard and durable and therefore will withstand the natural elements of weather and reduce the potential of
telephone 610.323.8752 • facsimile 610.323.8753 • bseidel@seidelplanning.com • www.seidelplanning.com
1240 east schuylkill road • pottstown pennsylvania 19465
seidel planning & design
land use planning & consulting
1240 e. schuylkill road, pottstown, pa 19465
damage or scratching which may occur during authorized climbing of the tower for routine maintenance or new antenna installations. Additionally, a gloss-finish is very smooth and therefore dirt, dust, pollen, or smoke which naturally occurs in the environment is less likely to adhere to the tower. Furthermore, any of these elements which may adhere to the tower will be more easily removed during natural rain events from a smooth gloss finish rather than a flat or matte finish. It is also important to note the gloss color will not cause any glare to the area which could be associated with a 'mirrored' finish.
Please contact me at (610) 323-8752 should you have any questions or require additional information.
Respectfully Submitted,
Brian E. Seidel, RLA AICP
cc: Richard J. Lemanowicz, Esq.
Samuel Kraus, Liberty Towers
telephone 610.323.8752 • facsimile 610.323.8753 • bseidel@seidelplanning.com • www.seidelplanning.com
1240 east schuylkill road • pottstown pennsylvania 19465
Commonwealth of Pennsylvania
Pennsylvania Historical and Museum Commission
Bureau for Historic Preservation
Commonwealth Keystone Building, 2nd Floor
400 North Street
Harrisburg, PA 17120-0093
www.phmc.state.pa.us
2 February 2012
TO EXPEDITE REVIEW USE
BHP REFERENCE NUMBER
Chad Kayser
Advantage Engineers
1250 Wrights Lane
West Chester, PA 19380
RE: ER# 11-2453-029-B
FCC: Balloon Test, Liberty Towers Proposed 180-Foot Cell Tower, 1570 Paoli Pike, E. Goshen Twp., Chester Co.
Dear Mr. Kayser:
The Bureau for Historic Preservation (the State Historic Preservation Office) has reviewed the above named project in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended in 1980 and 1992, and the regulations (36 CFR Part 800) of the Advisory Council on Historic Preservation as revised in 1999 and 2004. These regulations require consideration of the project's potential effect upon both historic and archaeological resources.
Thank you for providing the results of the balloon test for the above referenced project. The results indicate that the proposed tower will be visible within the Goshenville Historic District. Where the tower is clearly visible, a significant amount of modern development has occurred. In other places within the historic district that has not experienced modern development; the proposed tower is minimally visible. Based on this information, it is our opinion the proposed project will have no adverse effect on the National Register listed Goshenville Historic District. Thank you for your cooperation.
If you need further assistance in this matter, contact Ann Safley at (717) 787-9121.
Sincerely
Douglas C. McLearen, Chief
Division of Archaeology & Protection
cc: Senya D. Isayeff, Chair, Board of Supervisors, E. Goshen Twp., 1580 Paoli Pike, W. Chester, PA 19380-6199
DCMcL/ras
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 9, 2011
Mr. Douglas C. McLearen
Pennsylvania Historic Museum Commission
400 North Street
Commonwealth Keystone Building 2nd Floor
Harrisburg, PA 17120
Ph: 717-787-9121
RE: East Goshen PA-504 (Er-2011-2453-029-A)
1570 Paoli Pike
West Chester, PA 19380
East Goshen Township, Chester County, PA
AE Project # TPA31025
Dear Mr. McLearen:
East Goshen Township is contacting the Pennsylvania State Historic Preservation Office (PA SHPO) in regards to the proposed 150' (extendable to 180') unipole telecommunications facility at 1570 Paoli Pike in East Goshen Township, Chester County. Liberty Towers LLC, (Liberty) is the applicant for the proposed facility. East Goshen Township has reviewed the application for the proposed facility and supports the proposed location and design of the telecommunication facility.
We respectively request that your commission grant the approval for this tower to be erected for the following reasons:
- The location proposed for the tower has been moved, ~1,300 feet farther away from the Goshenville Historic District than the previous application, SHP#: ER-2010-0247-029-A, which the Township had opposed.
- The design has changed from a monopole structure with external antennas to a unipole design which allows all antennas to be mounted inside the structure, which is more desirable than the previous proposed monopole design.
- The color of the tower has been changed to an off-white color rather than the galvanized steel finish proposed in the previous application. We believe this color selection will afford the tower to blend into the skyline better.
In conclusion, East Goshen Township has been working closely with Liberty to develop a plan for a wireless communications tower that addresses the location, design and color in order to lessen the visual impacts to the Goshenville Historic District. We believe the measures we have incorporated into the design effectively mitigate the visual impacts while improving the quality of telecommunication services to the community.
F:\Data\Shared Data\Admin Dept\WCF RFP 2011\Liberty Towers\Ltr to SHPO East Goshen 12092011.doc
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
Enclosed are photo simulations which show the proposed tower incorporating all of the aforementioned alternative design aspects.
Sincerely,
Senya D. Isayeff
Board of Supervisors
Chairman
Enclosure
Cc: East Goshen Township Historical Commission
F:\Data\Shared Data\Admin Dept\WCF RFP 2011\Liberty Towers\Ltr to SHPO East Goshen 12092011.doc
ADVANTAGE ENGINEERS
LIBERTY TOWERS
PROPOSED
180' UNIPOLE
LIBERTY TOWERS PA-504 EAST GOSHEN
PROPOSED 180' UNIPOLE
(VIEW-2)
Prepared By:
seidel planning & design
land use planning & consulting
seidel planning & design
EXISTING TOWER LOCATED AT:
UPPER POTTSGROVE TOWNSHIP
1420 HEATHER PLACE, POTTSTOWN, PA 19464
APRIL 26, 2012
Prepared By:
seidel planning & design
land use planning & consulting
seidel planning & design
EXISTING TOWER LOCATED AT:
UPPER POTTSGROVE TOWNSHIP
1420 HEATHER PLACE, POTTSTOWN, PA 19464
APRIL 26, 2012
Prepared By:
seidel planning & design
land use planning & consulting
N State Rd
CHECK US OUT
seidel planning & design
EXISTING TOWER LOCATED AT:
UPPER POTTSGROVE TOWNSHIP
1420 HEATHER PLACE, POTTSTOWN, PA 19464
APRIL 26, 2012
[Handwritten in upper right: 11 a]
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 4/26/2012
To: Board of Supervisors
From: Mark Gordon, Zoning Officer [signature]
Re: Renzi Variance, 219 Ellis Ln.
Dear Board Members,
Mr. Renzi has submitted an application for zoning variance relief from the side yard in order to construct a detached garage at his property, 219 Ellis Ln. The request is for 8' of relief. Two of the neighboring property owners have submitted their support as part of the application. The lot is a very narrow lot and sloped in the side yard. I have drafted a motion for your consideration.
DRAFT MOTION:
Mr. Chairman, this property is a narrow and deep lot; approximately 100' wide and ~417' deep and sloped significantly in the side yard such that a conforming structure could cause more impact to the environment and property than the proposed solution. The applicant did not create this condition nor will granting this relief alter the character of the neighborhood. I move that we support Mr. Renzi's Variance request to build a garage with a side yard setback of no less than 12 feet which represents 8 feet of relief with the following condition(s).
- The applicant shall follow all applicable federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted in the variance application and the testimony provided by the.
F:\Data\Shared Data\Property Management\53-6\53-6-7 (219 Ellis Ln.)\2012 Variance\BOS Draft Motion 04262012.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
April 10, 2012
East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380
Re: Dimensional variance request / 219 Ellis Ln.
Dear Board Members:
At their meeting on April 10, 2012 the Planning Commission unanimously passed a motion recommending the Board of Supervisors support the dimensional variance request of Mr. Anthony Renzi at 219 Ellis Lane.
Madam Chairman, this property is a narrow and deep lot; approximately 100’ wide and ~417’ deep and sloped significantly in the side yard such that a conforming structure could cause more impact to the environment and property than the proposed solution. The applicant did not create this condition nor will granting this relief alter the character of the neighborhood. I move that we recommend that the Board of Supervisors support Mr. Renzi’s Variance request to build a garage with a side yard setback of no less than 12 feet which represents 8 feet of relief with the following condition.
- The applicant shall follow all applicable federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted in the variance application and the testimony of the applicant.
Sincerely,
Mark A. Gordon
Township Zoning Officer
F:\Data\Shared Data\Property Management\53-6\53-6-7 (219 Ellis Ln.)\2012 Variance\PC Rec to BOS 04102012.doc
RECEIVED BY:
MAR 28 2012
FILE COPY
EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION
1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950
Name of Applicant: Anthony P. Renzi, Jr.
Applicant Address: 219 Ellis Lane West Chester Pa 19380
Telephone Number: 610-344-0597 Fax Number:
Email Address: Renzi5@msn.com
Property Address: 219 Ellis Lane West Chester Pa 19380
Tax Parcel Number: Zoning District: Acreage: 1
Purpose of Application (check one)
[X] Variance (Type: [ ] Use Variance [X] Dimensional Variance)
[ ] Special Exception
[ ] Appeal determination of the Zoning Officer
[ ] Other ________________
Sections of Zoning Ordinance in which relief is sought:
240-9.G
Description of the Zoning Relief requested and the future use of the property:
Dimensional Relief Sought - 8' from Northern Property line.
We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.
Signature of Applicant: Anthony P. Renzi, Jr.
Date: 03-25-12
*Please review the formal application and review procedures on page three.
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 1 -
EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION
1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950
This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.
Applicant Name: Anthony Renzi
Application Process Checklist (Administration use only):
| Item | Date Complete |
|---|---|
| 1. Completed Township Application Form: | 3-28-12 |
| 2. All related materials submitted: | 3-28-12 |
| 3. Township application and review fees paid: | 3-28-12 |
Application accepted on 3-28-12 by MARK GORDON
Official Signature: Mark A. Gordon Title: ZONING OFFICER
Review Process Checklist
| Item | Date |
|---|---|
| 1. Start date: | 3-28-12 |
| 2. Date of first formal Planning Commission Meeting following complete application: | 4-4-12 |
| 3. Date sent to CCPC: | — |
| 4. Date sent to Township Engineer: | — |
| 5. Date presented to Planning Commission: | 4-4 |
| 6. Date sent to CB: | 4-2 |
| 7. Date sent To MA: | 4-2 |
| 8. Date sent to HC: | 4-2 |
| 9. Date sent to PRB: | 4-2 |
| 10. Date sent to TAB: | 4-2 |
| 11. Date by which the PC must act: | 5-2 |
| 12. Date by which Board of Supervisors must act: | 5-15 |
| 13. Drop Dead Date; (Day 60): | 5-27-12 |
| 14. Zoning Hearing Date: | 5-23-12 |
| 15. Dates of public advertisement: | 5-2 & 5-9 |
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 2 -
Anthony Renzi
219 Ellis Lane
West Chester, PA 19380
A dimensional variance for the placement of a garage on the property is being requested for the following reasons;
- The unique physical conditions of our property limit suitable building locations. These conditions include narrowness of lot (100’) and steep grading of the rear yard.
- These are existing conditions not created by myself.
- We believe that the building of this garage in the proposed location will not alter the character of the neighborhood being that most properties in the area have garages.
- 8’ relief from the 20’ side yard represents the minimum necessary to align the new garage with the existing driveway and also allowing for movement of vehicles and minimizing the increase of impervious coverage on the property.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
SITE PLAN
Show Lot Lines, Easements, Work Layout and Dimensions
[Hand-drawn site plan on grid paper showing lot lines, existing house, driveway, patio, deck, pool, existing shed to be removed, and proposed garage]
- PROPOSED GARAGE (40' x 24', 12' from property line)
- EXISTING SHED TO BE REMOVED (12' x [illegible], 20' from property line)
- Property Lines
- APPX. 300' TO REAR Property Line
- Pool
- 12' x [illegible] Deck
- 10' x 36' PATIO
- 23'
- 27'
- EXISTING DRIVEWAY
- 30' x 48' House
- 22'
- 221 / 219 / 219 / 217
- ELLIS LANE
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\BuildingZoningPermitApp 063009.doc
[Photograph of property yard showing existing shed, parked vehicles, and orange cones along the property line with printed text labels]
EXISTING SHED AT 20'FROM PROPERTY LINE TO BE REMOVED
PROPERTY LINE
PROPOSED BUILDING LINE AT 12'FROM PROPERTY LINE
March 23, 2012
I write this letter in support of Mr. Renzi’s plan to build a garage on his property. Mr. Renzi’s request for a variance to place the garage 12’ from our shared property line in no way negatively affects my property. I believe this project will improve the appearance of the Renzi property, thereby improving the entire neighborhood. I fully support this project.
Thank you.
Jason & Janet Lyle
221 Ellis Lane
West Chester, PA 19380
March 25, 2012
We endorse the Renzi’s plan to build a garage on their property. Most properties in our neighborhood have garages, the proposed garage will fit in nicely with the character of our neighborhood. As an adjacent property owner this proposed garage does not cause us any concern. We fully support this project.
Jeff and Violet Long
217 Ellis Lane
West Chester, PA 19380
March 25, 2012
We support Mr. Renzi’s plan to build a garage on his property at 219 Ellis Lane. We believe this plan will be an improvement to the property and surrounding neighborhood. Granting his request for a dimensional variance would allow for building in the only suitable area on his property.
Carol Wyman
Harvey and Carol Wyman
215 Ellis Lane
West Chester, PA 19380
Photograph of backyard area showing an existing wooden shed with a blue tarp roof, outdoor storage items, and lawn bordered by trees.
Photograph showing the side yard slope with ground cover vegetation, a white boundary stake, and an orange safety cone near the adjacent house.
Photograph showing the sloped ground covered in periwinkle groundcover, with boundary stakes, string line, and a marker cone in front of the neighboring house.
High-angle photograph of the backyard, rear of the house, driveway with vehicles, and lawn with covered items and an orange safety marker cone.
Photograph showing the wooden shed, landscaped bank, ground cover, and yellow boundary line with marker cones.
610-692-7171
www.eastgoshen.org
COPY
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
April 2, 2012
Dear Property Owner:
The purpose of this letter is to inform you that Mr. Anthony P. Renzi Jr., 219 Ellis Lane, West Chester, PA, 19380 has filed a Zoning Hearing Board Application requesting relief from the side yard setback requirements. Mr. Renzi proposes to build a garage on his property and is requesting 8 feet of relief from the 20 foot side yard setback requirement.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Hearing Board applications.
This application is scheduled to be discussed during the meetings outlined below and is subject to change:
April 4, 2012 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm)
May 1, 2012 - Board of Supervisors meeting (7:00 pm)
May 23, 2012 - Zoning Hearing Board (hearing @ 7:30 pm) (Zoning Hearing)
All meetings and hearings are held at the Township Building, are open to the public and are subject to change. The variance application is available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
Raymond D. McKee-man, Zoning Officer, West Goshen Township
F:\Data\Shared Data\Property Management\53-6\53-6-7 (219 Ellis Ln.)\2012 Variance\1000 foot ltr ZV 04022012.doc
116
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 4/26/2012
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: Goshen Meadows Apartments / Request for Waiver for HRIS
Dear Board Members:
Goshen Meadows Investors LLC has submitted a Conditional Use application requesting approval to develop the property at 1325 West Chester Pike. The property has an existing Historic resource and the applicant proposes to adaptively re-use the home and convert the structure into apartments. The applicant is requesting a waiver for the HRIS requirement of the ordinance.
I’m forwarding the application and requesting that you review the application and the applicants request for a waiver and advise the Planning Commission on your decision. The applicant has been advised that you will be discussing this matter and I suggested that they appear to present the waiver and answer your questions.
F:\Data\Shared Data\Property Management\53-6\53-6-56 (1325 WC Pike)\Conditional Use 2012\Memo to BOS 04262012.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
March 26, 2012
Dear Property Owner:
The purpose of this letter is to inform you that Goshen Meadows Investors, LLC, has submitted a Conditional Use application seeking approval for a Planned Apartment Development on the Property at 1325 West Chester Pike, West Chester, PA, 19382. The subject property is adjacent to the existing Goshen Meadows Apartment community. The applicant proposes to build five (5), twelve (12) unit buildings, and convert the existing single family historic home on the property to a four (4) unit apartment building for a total of sixty four (64) new apartments. The property is located in the C-4, Planned Highway Commercial Zoning District, where Planned Apartment Developments are permitted by conditional use pursuant to §240-16.C.(3) of the Township Zoning Ordinance.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Conditional Use applications.
The meeting dates and times scheduled for the review and discussion of this application are outlined below and subject to change.
May 1, 2012
Board of Supervisors meeting (7:00 PM)
The Board will consider a waiver request from the applicant requesting relief from the requirement to submit a Historic Resource Impact Study with their application for the adaptive reuse of an Historic Resource.
May 2, 2012
Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
(Presentation of Application)
May 10, 2012
Historical Commission meeting (7:00 PM)
(Presentation of Application)
June 6, 2012
Planning Commission meeting (workshop at 7:00 pm, formal meeting at 7:30 pm)
June 12, 2012
Board of Supervisors meeting (7:00 pm) (Conditional Use Hearing)
The meetings and hearings listed above are held at the Township Administration Building, 1580 Paoli Pike, and are open to the public. The application is available for public review during normal business hours at the Township Administration Building. If any person who wishes to attend the meetings has a disability and/or requires an auxiliary aid service or
F:\Data\Shared Data\Property Management\53-6\53-6-56 (1325 WC Pike)\Conditional Use 2012\1000 foot letter 53-6-56 04262012.doc
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
other accommodation to observe or participate, he or she should contact the Township at 610-692-7171 to discuss how those needs may be accommodated.
Please give me a call or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-6\53-6-56 (1325 WC Pike)\Conditional Use 2012\1000 foot letter 53-6-56 04262012.doc
FILE COPY
RECEIVED BY: APR 13 2012
Conditional Use Application and Checklist
East Goshen Township
To: Township Zoning Officer
Name of Applicant: Goshen Meadows Investors, L.P.
Applicant Address: c/o Scott Fagan, P.O. Box 446, Narberth, PA 19072
Telephone Number: 610-667-1700 ex 305 Fax: 610-668-2249
Email Address: asf@mmcrent.com
Property Address: West Chester Pike & Mary Fran Drive
Tax Parcel Number: 53-06-56 / 53-06-56.1 Zoning District: C-4 Acreage: 18.7514
Description of proposed use: See Attached
Conditional Use is provided in Zoning Ordinance Section: 240-16(C)(3)
We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.
Signature of Applicant: Goshen Meadows Investors, L.P.
Date: April 11, 2012
Attest: [Signature]
* Review the formal Planning Commission review procedure on page three.
RECEIVED BY: APR 13 2012
F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 1 -
Conditional Use Application and Checklist
Township Administration use only:
This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.
Application Checklist:
| Item | Date Complete |
|---|---|
| 1. Completed Township Application Form: | 4-13-12 |
| 2. All related materials submitted: | 4-13 |
| 3. Township application and review fees paid: | 4-13 |
Application accepted as complete on 4-13-2012 by MARK GORDON
Official Signature: Mark A. Gordon Title: TWP. ZONING OFFICER
Review Process Checklist
| Item | Date |
|---|---|
| 1. Start date: | 4-13-12 |
| 2. Date of first formal Planning Commission Meeting following Submission of complete application: | 5-2 |
| 3. Sent to Twp. Engineer: | 4-26 |
| 4. Date presented to Planning Commission: | 5-2 |
| 5. Abutting Property Letter sent: | 4-26 |
| 6. Date sent to CB: | " |
| 7. Date sent To MA: | " |
| 8. Date sent to HC: | " |
| 9. Date sent to PRB: | — |
| 10. Date sent to TAB: | " |
| 11. Date by which the PC must act: | 6-6 |
| 12. Date by which Board of Supervisors must act: | 6-12 |
| 13. Drop Dead Date; (Day 60): | 6-12 |
| 14. Conditional Use Hearing Date: | 6-12 |
| 15. Dates of hearing advertisement: | & |
| 16. Property Posted: |
F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 2 -
PROJECT NARRATIVE
Applicant: Goshen Meadows Investors, LP
Property: 1325 West Chester Pike, Tax Parcel No. 53-6-56
Zoning: C-4 Planned Highway Commercial District
Requested Approvals:
- Conditional Use Approval for a Planned Apartment Development pursuant to Section 240-16.C(3) of the Zoning Ordinance;
- Conditional Use Approval for the adaptive re-use of a historic resource by residential conversion into one or more dwelling units (four units) pursuant to Section 240-38.5.A(2)(c) of the Zoning Ordinance.
The Applicant, Goshen Meadows Investors, LP, is the equitable owner of the property located at 1325 West Chester Pike (S.R. 3) consisting of 5.89-acres of land (the “Property”). The Property is currently improved with a historic dwelling (identified as BLDG 6 on the Plan). The Applicant requests approval from the Board of Supervisors to develop the Property with a sixty-four (64) unit Planned Apartment Development pursuant to Section 240-16.C(3) of the Zoning Ordinance consisting of five new apartment buildings containing 12 units in each and the adaptive re-use of the existing dwelling as four apartment units. The Planned Apartment Development shall be in compliance with the regulations set forth in Section 240-29 of the Zoning Ordinance. Additionally, Goshen Meadows proposes to convert the existing historic structure into four apartments, therefore, conditional use approval pursuant to Sections 240-38.5.A(2)(c) and 240-38.7 is requested.
Below are the zoning ordinance sections applicable to the Plan:
1. Section 240-27.B(3)(a) of the Zoning Ordinance applies to developments which contain 25 or more dwelling units and provides: “All buildings shall have vehicle access upon a minor street, service road, common parking lot or similar area and not directly upon on an arterial highway or collector street.” The proposal is for the new apartment buildings to have access off of Mary Fran Drive which is a private street classified as a minor or local street therefore, we believe that this section of the Zoning Ordinance is met.
2. Section 240-27.B(3)(e) of the Zoning Ordinance requires two or more points of vehicular access to and from “public streets” serving developments with 25 or more dwelling units. The proposed apartment community is proposed to be accessed by a boulevard entrance onto Mary Fran Drive and a grass-paver emergency access entrance road onto West Chester Pike. The Township considers Mary Fran’s access to Rt. 3 and the emergency access both as points of vehicular access therefore the Plan is in compliance with this provision.
3. Section 240-29.C(6) of the Zoning Ordinance provides that the maximum height of all buildings shall not exceed three stories or 30-feet. The use of the word “or” means that the apartment buildings must meet one of these alternative standards; three stories or 30-feet. The proposed building height is 52 feet maximum with a building height as defined by the zoning ordinance to be 45 feet no more than three stories in compliance with this provision.
4. Goshen Meadows intends to combine its existing apartment development property with the Property into a single parcel in order for compliance with the following sections to be considered on the property as a whole:
- ZO Section 240-29(C)(5) requiring that all principal buildings shall be at least 50-feet from all street right of way lines and property lines. Because the property line between the existing Goshen Meadows property and the Property will be eliminated when the parcels are merged, the 50-foot setback requirement will not be violated
- ZO Section 240-29.C(3) requires 3,000 square feet of lot area per dwelling unit on the lot. A total of 256 units on both properties combined is equal to 3,082 square feet per unit.
- ZO Section 240-29.C(8) limits the size of apartments to 2 bedrooms and requires that no more than 40% of the total number of dwelling units contain 2 bedrooms. Mostly 2 bedroom units are proposed with the total number of 2 bedroom units in the existing and proposed development in compliance with the 40% ratio.
- ZO Section 240-29.C(4) provides maximum building coverage of 20% and maximum impervious surface coverage of 40% both of which comply when the properties are considered together.
5. Section 240-38.8 of the Zoning Ordinance. No proposed exterior physical changes are proposed to the historic dwelling except for possibly the installation of a new roof and windows to fit with the style of the dwelling. The proposed five new apartment buildings are similar in footprint to the historic dwelling making the feel of the proposed apartment community consistent in character with the dwelling. Based on the fact that no exterior physical changes are proposed to the historic dwelling, the Applicant requests a waiver from the requirement in Section 38.8.A(5) of the Zoning Ordinance to submit a Historic Resource Impact Study.
[Handwritten in margin next to item 5:] WAIVER REQ.
Aug 16 04 11:41a (610) 431-8455 p.12
[Two black-and-white photographs: top photograph shows a multi-story historic building with an enclosed wrap-around porch; bottom photograph shows the gable end of a smaller white building surrounded by trees]
Aug 16 04 11:42a (610) 431-8455 p.13
[Two black-and-white photographs: top photograph shows a yard and small structure backed by trees; bottom photograph shows the side exterior wall of a building partially covered in ivy with an adjoining multi-story wing]
Aug 16 04 11:45a (610) 431-8455 p.14
[Two black-and-white photographs: top photograph shows the front facade and enclosed porch of a multi-story building with mansard roof; bottom photograph shows a close-up of the gable end wall of a building with a single ground-floor window]
Aug 16 04 11:49a (610) 431-8455 p.15
[Black-and-white photograph showing the front facade and enclosed porch of a multi-story historic building]
[Handwritten in upper right: 11c]
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. 2012-9A
A RESOLUTION ESTABLISHING A SPECIFIC DATE FOR PUBLIC HEARINGS.
WHEREAS, on January 2, 2012 the Board of Supervisors adopted Resolution 2012-9 establishing the meeting schedule for 2012; and
WHEREAS, the Board believes it would be in the best interest of the Township, the residents and applicants if the Board scheduled public hearings for a specific meeting.
BE IT RESOLVED THAT the Board of Supervisors of the East Goshen Township hereby states that to the extent possible all public hearings of the Board of Supervisors will be held on the second Tuesday of each month.
RESOLVED AND ADOPTED, this 1st day of May, 2012.
ATTEST:
_____________________
Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
_____________________
_____________________
_____________________
_____________________
_____________________
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2012\2012-9A BofS Public Hearings.docx
[Handwritten in upper right: 11e]
Memo
To: Board of Supervisors
From: Jon Altshul
Re: Long-Range Financial Planning Session
Date: April 24, 2012
I would like to suggest that we hold our annual long-range planning session on Thursday, June 14th from 1pm to 4pm.
[Upper right: 11f DRAFT]
Request For Proposals
For
Job Classification and Compensation Study and Analysis
Request Release Date: May 3, 2012
Due Date: May 17, 2012
I. Purpose of Request
The Township of East Goshen is seeking proposals from qualified consultants to conduct a comprehensive job classification and compensation study and analysis for Township employees.
The Township currently has 22 full time employees and 1 part time employee. The positions are currently designated into 17 different job classifications, which are ranked and a salary range for each position has been established. The compensation for each position is based on the job ranking and the relationship to selected benchmark positions at comparable municipalities.
The purpose of this study and analysis is to update as necessary all aspects of the current job classification and compensation plan in order to ensure that it is fair and competitive in the marketplace. The goal is to assure internal equity and external competitiveness in a fiscally responsible manner.
Options for other job classification and/or compensation plans may also be considered.
II. Scope of Services
The consultant shall perform or provide the following tasks:
Phase 1 - The consultant will review the current job descriptions, job ranking plan, salary ranges, compensation plan and performance evaluation plan and make finding and recommendations to the Board of Supervisors as follows.
Job Descriptions
The consultant shall review the current job descriptions, evaluate all positions and create, modify and/or update job descriptions where necessary. The intention being that each job description accurately reflects the duties, skills, physical requirements, education requirements, etc. of a specific position.
Job Ranking Plan
The intention is to have a job ranking plan under which all existing job descriptions and any new job descriptions can be ranked objectively. The consultant shall review the job ranking plan and modify and/or update where necessary.
1
Salary Ranges
The consultant shall review the current salary range for each position. The consultant shall evaluate the present salary ranges as compared to the specific job market for comparable positions in the private and public sectors. There shall be a relationship between the job ranking plan and the salary ranges so that if a new job description is created, the salary range for the position can be established when the job is ranked. The consultant shall modify and/or update the salary range for each position where necessary.
Compensation Plan
The consultant shall review the current compensation plan. The consultant shall conduct a comprehensive compensation survey of the regional labor market that includes at least four comparable positions in the public and private sector. The data used should be based on the wages in effect for the 2012 calendar year. The method in which to perform this analysis is to be determined by the consultant. The consultant shall make recommendations to the compensation plan where necessary.
Employee Performance Evaluation and Recognition
The consultant shall review the current employee performance evaluation and recognition plan. The consultant shall provide the Township with recommendations to modify and/or update the performance evaluation plan.
Phase 2
Implementation
The consultant's responsibilities will include, without limitation: (1) conducting of onsite training sessions with selected employees regarding the implementation and management of the selected recommendations; and (2) preparation for, and the conducting of, three employee roll-out meetings on separate days within the same week.
III. Expected Deliverables
As a result of the analysis as identified in the above Scope of Services, the consultant is expected to present the following:
Phase 1—To be completed by August 31st
A written report outlining the findings related to the tasks listed in the Scope of Services addressed to the Board of Supervisors. The report shall include the consultant's recommendations with supporting information in sufficient detail to evidence the basis for the final recommendation.
The consultant shall provide a listing of the potential benefits and drawbacks related to each recommendation, an explanation of the impact of the recommendations in a non union environment, and an explanation as to why the consultant has made such recommendation.
2
An operations manual suitable for inclusion in the Township Personnel Policy that provides the necessary documentation and other materials so the Township staff will be able to maintain the updated job classification and compensation plan independent of the consultant following implementation.
An outline of proposed implementation action steps, with recommended timing necessary to implement the recommendations. The action steps should be in sufficient detail as necessary to adopt the consultant's recommendations without requiring ongoing support from the consultant during implementation.
One copy of the draft and final reports should be provided in a three-ring binder. An additional copy of each report shall be provided electronically in a portable document format (PDF).
The consultant shall attend at least one meeting with the Board of Supervisors to review the draft report.
The report will not be considered finalized until formally accepted by the Board of Supervisors.
The consultant shall present the final report at a Board of Supervisors meeting.
Phase 2—To be completed by September 30
Training materials as needed for the training sessions.
Orientation materials as need for the employee roll-out meetings.
IV. Qualifications
The Township is seeking experienced consultants to provide the services detailed in this RFP. Therefore, at minimum, respondents should possess and detail experience in the following areas to be considered qualified for the Project:
- Experience and expertise in analyzing municipal compensation and job classification plans, and identification of best practices.
- Knowledge of Federal and Pennsylvania laws and regulations governing compensation of municipal employees.
- Experience in analyzing, making and implementing recommendations in municipalities whose operations are not influenced by employee collective bargaining agreements.
- Demonstrated experience redesigning compensation and/or classification plans in a municipal setting, preferably within Pennsylvania.
- Experience conducting employee meetings or human resources staff training for the purpose of transitioning a municipality to a new or revised job classification and compensation plan is strongly preferred, but not required.
3
V. Township Resources
The Township will provide copies of all job descriptions, the job ranking plan, salary ranges, compensation plan, performance evaluation plan and other available in-house information that the successful consultant may require to complete the study.
VI. Materials to Submit
Interested firms must submit one copy (unbound) of their proposal to the Township Manager at East Goshen Township, 1580 Paoli Pike, West Chester, PA 19380, no later than 4:00 p.m., on May 17, 2012
Interested parties are solely responsible for ensuring that proposals are delivered on time. Proposals received after the due date and time will be returned unopened. The total number of pages in the submittal shall not exceed ten (10) pages. Economy of preparation and brevity are encouraged.
VII. Cost of Proposal
This request for proposal does not, under any circumstance, commit the Township to pay any costs incurred by any proposer in the submission of qualifications. The proposer is responsible for all costs associated with response to this request.
VIII. Proposal Disposition
All materials submitted in response to this request for information shall become the property of the Township upon delivery.
IX. Proposal Content
The total number of pages in the proposal shall not exceed 10 pages.
1. Introduction – On the cover sheet for the proposal, provide the official name, address, phone number, fax number of the organization or firm, the name of the principal contact person, and their e-mail address.
2. Experience and Qualifications –
- A brief description of the organization or firm
- A brief description of the experiences and qualifications of the proposed staff member(s) who will be performing the services
- A list of municipalities for which the consultant has conducted comprehensive classification and compensation studies (within the past five years)
- A list of three recent client references, including name, address, telephone and fax numbers, and email address.
2. Approach/Methods Used to Perform the Project – Detailed description of the methods by which the tasks set forth in the Scope of Services will be performed. The description shall include the following items:
4
- Proposer’s understanding of the services to be provided
- Methodology to be used for tasks in Phase 1
3. Costs – A complete breakdown of all costs to perform the specific tasks outlined in the proposal (both Phase 1 and 2).
X. Evaluation Criteria
The following will be considered in the selection of a consultant:
- Relevant experience in similar-sized entities
- Qualifications
- Understanding of Township-related issues and employee relations
- Team compatibility, including the ability to work with Township staff based on references and other supporting information
- Unique resources the firm may bring regarding innovative techniques
- The professional reputation of the firm
The Township reserves the right to reject any or all proposals at any time with no penalty and to waive immaterial defects and minor irregularities in proposals. The evaluation and recommendation of proposals will be done by the Township Manager and the Board of Supervisors will be responsible for the final selection.
XI. Discrimination
The Township does not discriminate on the basis of race, creed, color, ethnicity, national origin, sex, age or marital status.
F:\Data\Shared Data\Admin Dept\Human Resources\Classification & Compensation\Draft RFP v2.doc
5
[Handwritten in upper right: 11g]
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 4/26/2011
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer [signed: Mark]
Re: Comp Plan Update / Planning Consultant / DRAFT RFP
Dear Board Members:
As requested I have enclosed a DRAFT RFP for your review and comment. The intent is to solicit proposals from Planning Consultants to help us with our upcoming Comprehensive Plan Update. I’ll be at your meeting on Tuesday night if you have any questions.
-Mark
F:\Data\Shared Data\Admin Dept\Comp Plan\2012 Update\Memo to BOS 04262012.doc
East Goshen Township – Comprehensive Plan Update RFP
[Seal: TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, INCORPORATED 1817, depicting a historic stone building with an American flag]
REQUEST FOR PROPOSALS
Planning Consultant to Prepare the
Township Comprehensive Plan Update
TOWNSHIP OF EAST GOSHEN
April 23, 2012
DRAFT
RFP’s Due: June 1, 2011, 4:00 P.M. Local Time
F:\Data\Shared Data\Admin Dept\Comp Plan\2012 Update\Plan Cons RFP DRAFT 0232012.doc
1
East Goshen Township – Comprehensive Plan Update RFP
TABLE OF CONTENTS
Cover Page
Table of Contents
Introduction
Proposals
Schedule of Events
Technical Specifications
- General
- Comp Plan Update Approach and Standards
- Required Information
- Township Obligations in support of the Comp Plan Update
- Compensation Schedule
- Evaluation Criteria
Summary
F:\Data\Shared Data\Admin Dept\Comp Plan\2012 Update\Plan Cons RFP DRAFT 0232012.doc
2
East Goshen Township – Comprehensive Plan Update RFP
Introduction
The East Goshen Township Board of Supervisors is soliciting proposals from Professional Planning Consultants to prepare an update to the Township Comprehensive Plan.
East Goshen Township completed a comprehensive revision to the Comp Plan in June of 2005. The Board of Supervisors wants to align the Township Comprehensive Plan with the Chester County Comprehensive Plan, Landscapes 2. The Planning Consultant who is awarded the project will be required to file for the Chester County Vision Partnership Program Grant as part of this proposal in order to help offset the cost of the Comp Plan update.
Proposals
All proposals shall be received by the Township no later than June 1, 2012, 10:00 A.M. Local Time.
Proposals shall be delivered to:
East Goshen Township
Attn: Mark A. Gordon, Township Zoning Officer
1580 Paoli Pike
West Chester, PA 19380
All questions regarding this RFP shall be submitted in writing (mail or e-mail) to Mr. Gordon at the above address or to mgordon@eastgoshen.org. All updates and amendments to this RFP as well as any changes to the proposed schedule will be posted on the Township website, www.eastgoshen.org. Notification of these postings will be e-mailed to prospective Vendors who request the RFP package and provide an e-mail address to the Township.
F:\Data\Shared Data\Admin Dept\Comp Plan\2012 Update\Plan Cons RFP DRAFT 0232012.doc
3
East Goshen Township – Comprehensive Plan Update RFP
Schedule of Events
The proposed schedule for the RFP process is as follows:
| Event | Date / Time |
|---|---|
| Issue Request for Proposals: | May 1, 2012 |
| Cutoff for Written Questions: | May 22, by 4:00 P.M. |
| Proposals Due | June 1, 2012 by 10:00 A.M. |
| Board of Supervisors Discussion | June 5, 2012 |
| Issue “Intent to Award” | June 19, 2012 |
| Finalize Contract Language | June 22, 2012 |
Technical Specifications
1. General
The East Goshen Township Board of Supervisors is soliciting proposals to prepare an update to the Township Comprehensive Plan. The selected planning consultant will enter into a contract with the Township to prepare an update to the East Goshen Township Comprehensive Plan to be completed no later than January 31, 2014
2. Comp Plan Update Approach and Standards
A detailed description shall be included outlining the approach and the standards that the final version of the Update will meet.
3. Required Information
- Provide a sample of your standard contract for services.
- Provide a project schedule for the Comp Plan Update.
- Detailed breakdown of all project costs.
F:\Data\Shared Data\Admin Dept\Comp Plan\2012 Update\Plan Cons RFP DRAFT 0232012.doc
4
East Goshen Township – Comprehensive Plan Update RFP
- Provide three municipal references from Pennsylvania where you have completed similar Comprehensive Plan projects.
4. Township Obligations in support of the RFP
- Once a consultant has been selected, the Township will form a Comp Plan Taskforce comprised of members from the various Township Boards and Commissions and full time staff to assist the consultant with developing the update.
5. Evaluation Criteria
The Board of Supervisors will evaluate the proposals based on, at a minimum, the following criteria (in order of importance):
- Completeness of Proposal
- Project Cost
- Grants – Describe your background in grant writing and the success you have had and if you have had success in previous rounds of the Chester County VPP Grant process.
- Technical Proposal
Summary
The Board of Supervisors of East Goshen Township reserves the right to waive any technicalities and to select the proposal which it deems, at its sole discretion, as the proposal that is best suited for the intended purpose and which best serves the interests of East Goshen Township and its residents.
F:\Data\Shared Data\Admin Dept\Comp Plan\2012 Update\Plan Cons RFP DRAFT 0232012.doc
5
[Handwritten in upper right: 11 h]
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
To: Board of Supervisors
From: Mark Miller
Re: Sale of Sewer Cleaner
Uwchlan Township had offered to buy our old sewer cleaner in the amount of $1,000.
We have had it for sale since the purchase of our new unit in 2010. The unit was purchased as “used” from West Goshen Township in 1990.
I would recommend selling the unit to Uwchlan Township in the amount of $1,000.
F:\Data\Shared Data\Public Works Dept\Equipment\Sale of Sewer Cleaner to Uwchlan Township 2012To.docx
13a
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
April 17, 2012 – 6:00pm
Draft Minutes
Present: Chairman Senya D. Isayeff, Vice-Chairman Thom Clapper and Supervisors Marty Shane, Carmen Battavio and Chuck Proctor. Also present were Township Manager Rick Smith, Director of Finance Jon Altshul, Township Solicitor Kristin Camp, Al Zuccarello (Planning Commission and Commerce Development Commission), Kathryn Yahraes (Historical Commission), Derek Davis (Assistant to State Rep. Dan Truitt) and Westtown Supervisor Tom Haws.
Executive Session
The Board met in Executive Session from 6:00pm until 7:00pm to discuss a personnel matter and the police labor contract.
Call to Order & Pledge of Allegiance
Senya called the meeting to order at 7:00pm. Jon Altshul led everyone in the Pledge of Allegiance.
Moment of Silence
Carmen Battavio called for a moment of silence to honor the troops.
Recording of Meeting
No one indicated they would be recording the meeting.
Officer of the Year
Detective Balchunis, a 12-year veteran of the Police Department, was presented with the Officer of the Year award by Police Chief John Dumond and Police Commissioner Carmen Battavio. After receiving the award the Detective and his family, friends and fellow officers celebrated with cake and ice cream. The Board thanked Detective Balchunis for his service to the residents of East Goshen, Westtown and Thornbury Townships.
Landscaping
The Board recognized Vince Del Vacchio for landscaping the front of the Township Building. The Del Vacchio Landscape and Garden Center recently opened at the old McGinty’s location.
Chairman’s Report
Senya announced that the Board met in Executive Session on April 12 to discuss the police labor contract and immediately before this meeting to discuss a personnel matter and the police labor contract.
4/24/2012 April 17, 2012 BOS Minutes Page 1 of 7
Resolution 2012-4A Appointing Jon Altshul the Township Treasurer
Senya introduced the new Director of Finance Jon Altshul, a resident of East Goshen. Marty moved to adopt Resolution 2012-4A appointing Jon as the Township Treasurer. Chuck seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Public Comment on Non-Agenda Items
None.
Public Hearing – Ordinance to Create Park & Recreation Commission
The Board conducted a public hearing to consider adoption of an ordinance to create a Park & Recreation Commission. Carmen moved to adopt the ordinance. Chuck seconded the motion. The Board voted unanimously to approve the motion. A court reporter was present and will provide a complete transcript of the proceedings. Rick said he will forward copies of the ordinance to the residents who have expressed interest in serving on the Park & Recreation Commission.
Public Hearing – Conditional Use Application for Camp K-9 Paradise for Paws
The Board conducted a public hearing to consider a conditional use application by Camp K-9 Paradise for Paws, a canine daycare, training, and boarding facility to be located at 1303 West Chester Pike. Applicant Jason Morgera was present with his attorney Brian Nagle.
Marty moved to approve the conditional use application of Camp K-9 Paradise for Paws pursuant to Section 240-14(C)(12) of the East Goshen Township Zoning Ordinance to allow a kennel/dog daycare use on the Property subject to the following conditions:
- The use shall be operated in accordance with: (i) the Conditional Use Application dated February 28, 2012 and the narrative attached thereto; (ii) the Conditional Use Plans, prepared by Jeffrey M. Laufer, AIA, dated February 28, 2012, last revised April 4, 2012 (the “Plans”); and (iii) all testimony and evidence presented by Applicant during the conditional use hearing.
- Applicant shall limit the number of dogs on the Property to a maximum of 120 dogs at any one time.
- Applicant shall prepare and maintain accurate records of the number of dogs that are kept on the Property on a daily basis. Such records shall be available for inspection by the Township upon request.
- Applicant and the kennel use shall comply with the Township noise control standards in the Zoning Ordinance and Chapter 156 of the East Goshen Code titled, “Noise.”
- Applicant shall implement a plan that is approved by the Board to address complaints from neighbors concerning excessive dog barking.
- Applicant shall install the reserved parking on grass pavers depicted on the Plans if the Township Zoning Officer determines that additional parking is necessary. Such parking shall be installed in accordance with the Township’s specifications within 60 days of receipt of written notice from the Township, weather permitting.
4/24/2012 April 17, 2012 BOS Minutes Page 2 of 7
- The parking lot and vehicle access surfaces shall be repaired as determined by the Zoning Officer and all parking areas re-striped prior to the issuance of a use and occupancy certificate.
- The existing wall sign and freestanding signs shall be refaced and no additional sign area shall be added to these two signs and no additional signs shall be permitted on the Property except for the directional signs shown on Exhibits A-1(a) and A-1 and those required to be installed by condition number 14 below.
- Applicant shall provide to the Township a copy of the kennel license that it obtains from the Commonwealth of Pennsylvania, Department of Agriculture and shall continuously maintain such license.
- Applicant shall install 150 watt lighting fixtures at the rear of the building in the location identified on the Conditional Use Rendered Plan which was admitted into the record as Exhibit A-1a to improve the parking lot lighting.
- Applicant shall adhere to all applicable Federal, State, County and local laws, ordinances, and regulations and shall secure all proper permits prior to construction of the improvements depicted on the Plans.
- Applicant shall meet annually with representative from the emergency responders who will be called to respond to emergencies at the kennel in order to provide training on the method of removing dogs in the event of an emergency. Any reasonable costs incurred in such training shall be paid for by Applicant.
- Applicant shall direct its customers/clients to drop off and pick up their dogs in the rear of the building as needed to prevent vehicles from backing up onto West Chester Pike.
- Applicant shall install signage at the exit of the Property which indicates “No Left Turn” and “No U-Turn at the intersection of Ellis Lane and West Chester Pike.”
- Applicant shall provide to its customers/clients and shall advertise in its marketing materials suggested directions on how to get to the Property.
Thom seconded the motion.
Dave Macatee (uncle of the applicant) and Al Zuccarello both urged the Board to approve the application.
Mr. Nagle and his client said they accepted the conditions and agreed to waive the Township’s 24-hour notification requirement.
The Board voted unanimously to approve the motion.
A court reporter was present and will provide a complete transcript of the proceedings.
Police Report
Chief John Dumond reported there were 439 calls for service from East Goshen in March.
Goshen Fire Company Report
No one was present from the Goshen Fire Company, and no report was received this month.
4/24/2012 April 17, 2012 BOS Minutes Page 3 of 7
Malvern Fire Company Report
No one was present from the Malvern Fire Company, but they submitted a written report for their activities in March 2012.
Fire Marshal Report
The Board reviewed the March report from Fire Marshal Mark Miller.
Financial Report
Jon Altshul provided a financial report for the 1st Quarter of 2012.
Fireworks/Community Day
Senya reported that the Township will know by May 1 whether or not a joint fireworks event will be held with West Goshen. Marty wanted to discuss having a Community Day event in conjunction with the fireworks again this year. He expressed disappointment that the Township was not planning to go forward with a Community Day event for 2012 after the big success it was in 2011. Thom also expressed disappointment that a Community Day would not be held in 2012 but said he is not willing to spend Township money toward the event. He also stated that he did not want to interfere with the fundraising efforts by the 501(c)3. Chuck said the Township should have Community Day again this year and suggested the Board consider using some of the transfer tax windfall from the sale of Bellingham toward the cost of the event. The consensus of the Board was that it is very important to bring the community together in a positive way, and this event would be a worthwhile endeavor. There was some discussion on where the event should be held – at the Township Park, at East High School/Price property or at West Goshen’s park, but nothing was decided.
Marty moved for the Township to proceed with plans for a Community Day in 2012 in conjunction with West Goshen if possible, and if not, East Goshen should proceed to hold the event on its own, with an expenditure of up to $30K, which will include the $18K promised from the Friends of East Goshen. Chuck seconded the motion. Senya noted that the Friends of East Goshen were asked to provide $30K for this event but agreed to provide only $18K.
There was no further discussion and no public comment. The Board voted unanimously to approve the motion. Rick will contact the Friends of East Goshen to inform them the Township is going ahead with this event at a budget of $30K.
Marty asked if the Township had heard anything from resident Leo Sinclair who said he would help raise funds for this event. Rick said he had heard nothing.
Color Selection for Cell Tower on Township Property
The Board agreed to table this matter until some expert opinions have been obtained on the best choices for color.
Resolution 2012-64A, Commerce Development Commission
Thom moved to adopt Resolution 2012-64A, changing the name of the Community Development Commission to the Commerce Development Commission, with one minor change to the draft as made by Marty. Marty seconded the motion. CDC Chairman Al Zuccarello noted the name change was being requested because the original name for the group was causing some
4/24/2012 April 17, 2012 BOS Minutes Page 4 of 7
confusion to businesses the members were contacting. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Fiduciary Liability Insurance
Thom moved to direct the Township Manager to proceed with purchasing a $1M Fiduciary Liability Insurance policy from Travelers in the amount of $2,276. Chuck seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Mower Replacements
Carmen moved to approve the expenditure of $15,702 to purchase two replacement mowers per the April 9 request of Mark Miller, Director of Public Works. The mowers were budgeted at $16,000. Thom seconded the motion. There was no discussion and no public comment. The Board voted unanimously to approve the motion.
Any Other Matter
Garden Fair & Plant Sale - Thom announced that the Penn State Extension will hold a Garden Fair and Plant Sale at the Township Building on April 28 from 9:00am to 3:00pm. Plants will be sold and there will be informational workshops, activities, and demonstrations.
All-Day Summer Camp – Thom reported that per Frank Vattilano, there is not sufficient interest among the residents to hold an all-day summer camp at this time. Frank sent out a survey to the parents of past camp attendees. Surveys were sent to 200 households and 71 responses were received. Thom said he believes the survey should have been sent out to a larger population of residents and Senya agreed.
Marty said researching this matter will be a good task for the new Park & Recreation Commission, who will need to survey the residents on what programs they would like to have.
Senya said it’s disappointing to him that East Goshen, which prides itself on being a premier Township, does not provide an all-day summer camp for children. He said the Township needs to advertise an all-day camp in the Daily Local, on the Township website, Township signboards, at the Farmers’ Market and on Constant Contact. He asked Rick to instruct Frank Vattilano to make more of an effort in this regard.
Review of Minutes
The Board reviewed and corrected the draft minutes of April 3. Senya announced that the minutes would stand approved as corrected.
Treasurer’s Report & Expenditure Register Report
See attached Treasurer’s Report for April 12, 2012.
The Board reviewed the Treasurer’s Report and the current invoices. Thom moved to accept the Treasurer’s Report of April 12 and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Chuck
4/24/2012 April 17, 2012 BOS Minutes Page 5 of 7
seconded the motion. There was no further discussion or public comment. The Board voted unanimously to approve the motion.
Senya stated again that he would like the exercise instructors to rent Township space to hold their classes and to do all the work of taking their own registrations, etc. He does not think the Township should be doing the administration work for the exercise instructors. The Board began a discussion of this matter but agreed to table it until Rick gets some additional information from Frank Vattilano.
Action List
Cloud Computing – No updates.
Comp Plan – Staff is preparing the RFP.
IT Committee Implementation – The Board reviewed an updated status report on the implementation of the IT Committee’s recommendations.
Municipal Authority Projects – The Ridley Creek Sewage Treatment Plant is complete. Lockwood construction is scheduled to begin in April. The Marydell, Reserve, and Hershey Mill Pump Stations are in the final design stage.
Quarterly Financial Reports – The Board reviewed the quarterly financial reports.
Quarterly Report on I&I – The Board reviewed the quarterly I&I report.
Quarterly Report of Right-To-Know Requests – Tabled until the May 1 meeting.
Telecom Registration & Reporting – Enforcement action against T-Mobile has been initiated.
Televising Meetings – Rick reported that he contacted West Chester University. Thom moved for staff to terminate all information gathering activity on this matter because four members of the Board are not in favor of televising meetings. Carmen seconded the motion. The Board voted 4:1 in favor of the motion. (Senya was opposed.)
Billboard Ordinance – Rick reported that the Chester County GIS Department will provide the Township a map with ADT counts and vacant lots.
Correspondence & Reports of Interest
Senya acknowledged receipt of the following:
- Letter from residents Harry and Ann Cummings thanking Mark Miller for his help on a sewer line problem.
- Report from the Director of Public Works on March activities.
- Copy of a letter sent to residents regarding a Zoning Hearing Board application made by Anthony Renzi, Jr. for 219 Ellis Lane.
- Letter from the Chester County Tax Collection Committee regarding the Philadelphia Tax Credit.
Meetings & Dates of Importance
Senya noted the upcoming meetings as listed in the agenda.
Public Comment Period
Kathryn Yahraes – Gave a report on Keep East Goshen Beautiful Day. A list of everyone who volunteered will be posted to the Township website. Marty praised Kathryn and Jack Yahraes for doing a great job running this annual program so successfully.
4/24/2012 April 17, 2012 BOS Minutes Page 6 of 7
Adjournment
There being no further business, the meeting was adjourned at 10:37pm.
Anne Meddings
Recording Secretary
Attachment: Treasurer’s Report
4/24/2012 April 17, 2012 BOS Minutes Page 7 of 7
April 12, 2012
TREASURER'S REPORT
2012 RECEIPTS AND BILLS
| GENERAL FUND | |||
|---|---|---|---|
| Real Estate Tax | $231,396.58 | Accounts Payable | $328,148.50 |
| Earned Income Tax | $83,175.61 | Electronic Pmts: | |
| Local Service Tax | $152.93 | Health Insurance | $0.00 |
| Transfer Tax | $0.00 | Credit Card | $1,568.52 |
| General Fund Interest Earned | $4,944.47 | Postage | $0.00 |
| Total Other Revenue | $30,189.47 | Debt Service | $0.00 |
| Payroll | $86,000.00 | ||
| Total Receipts: | $349,859.06 | Total Expenditures: | $415,717.02 |
| STATE FUND | |||
|---|---|---|---|
| Interest Earned | $0.32 | Expenditures: | |
| CAPITAL RESERVE | |||
|---|---|---|---|
| Interest Earned | $4,592.08 | Expenditures: | $7,343.08 |
| TRANSPORTATION FUND | |||
|---|---|---|---|
| Interest Earned | $338.31 | Expenditures: | |
| SEWER OPERATING | |||
|---|---|---|---|
| Receipts | $15,802.90 | Accounts Payable | $202,248.36 |
| Interest Earned | $79.63 | Debt Service | |
| Total Sewer: | $15,882.53 | Total Expenditures: | $202,248.36 |
| REFUSE | |||
|---|---|---|---|
| Receipts | $4,344.99 | ||
| Interest Earned | $72.51 | ||
| Total Refuse: | $4,417.50 | Expenditures | $61,533.13 |
| SEWER CAPITAL RESERVE | |||
|---|---|---|---|
| Interest Earned | $373.07 | Expenditures | |
15.
EAST GOSHEN TOWNSHIP
ACTION LIST
New additions are in bold
1-May-12
| # | Item | Date |
|---|---|---|
| ADM 11-15 | Cell Tower | 1-May-12 |
| DPW 07-02 | Hershey's Mill Dam | 1-May-12 |
| ADM 11-16 | Post Retirement Medical Benefits | 1-May-12 |
| ADM 10-22 | TAG Action List | 1-May-12 |
| PCZ 12-3 | Billboard Ordinance | 15-May-12 |
| PCZ 11-6 | Sign Ordinance | 15-May-12 |
| ADM 11-24 | Cloud Computing | 15-May-12 |
| PCZ 12-01 | Comp Plan | 15-May-12 |
| ADM 11-22 | IT Committee Implementation | 15-May-12 |
| PCZ 09-01 | Telecom Registration and Reporting | 15-May-12 |
| ADM 11-13 | Municipal Authority Projects (qtrly) | 17-Jul-12 |
| FIN 11-05 | Quarterly Financial Reports | 17-Jul-12 |
| DPW 08-02 | Quarterly Report on I&I | 17-Jul-12 |
| ADM 09-04 | Quarterly Review of Right to Know Requests | 17-Jul-12 |
Action List 050112.xlsx 1 4/26/2012
EAST GOSHEN TOWNSHIP
ACTION ITEM
Item: Cell Tower
No: ADM 11-15
List Date: 2/17/2011
Completed Date:
Description: Consider locating a cell tower on Township Property
| Date | Action |
|---|---|
| 4/5/2011 | We received 3 responses and 1 request for an extension from the RFP |
| 4/12/2011 | Board needs to decide if they want to consider incomplete proposals |
| 4/19/2011 | Subcommittee of Don, Thom, Rick and Mark directed to review the three propos |
| 4/26/2011 | Subcommittee has met with the 3 carriers, Recommendation forthcoming |
| 5/3/2011 | Subcommittee report attached |
| 5/24/2011 | 1,000, foot letter sent, on 5/24 meeting agenda. Sub committee selected to |
| 6/28/2011 | Consider Proposal from Liberty |
| 7/12/2011 | Consider Proposal from Liberty |
| 7/26/2011 | Review draft agreement attached |
| 9/6/2011 | Ordinance adopted, waiting on a revised agreement and exhibits from Liberty |
| 10/4/2011 | Revised agreement and exhibits under review by subcommittee |
| 11/1/2011 | Rich is updating agreement and site plan to reflect agreed upon changes. Federal and state cases on hold. Waiting on color chip and sample of tower skin. Need letter on impact to Historic District. |
| 12/6/2011 | Rich is updating agreement. We have received an updated site plan and photo seems. |
| 1/10/2012 | All issues resolved, waiting on agreement and plan from Rich |
| 2/7/2012 | Township Executed Agreement on 1/17. |
| 3/6/2012 | Rich is working on permit plans. Deposit in escrow. Still in feasibility period. |
| 4/3/2012 | Permit plans have been submitted. The need to submit some additional info before permit can be issued. Both court cases have been dismissed. |
| 5/1/2012 | Need to select color. |
EAST GOSHEN TOWNSHIP
ACTION ITEM
Item: Hershey's Mill Dam
No: DPW 07-02
List Date: 5/22/2007
Completed Date:
Description: Bring Dam into compliance with DEP requirements or dispose of dam
| Date | Action |
|---|---|
| Note I have hidden the 2010 comments to save space | |
| 1/3/2011 | Update from Neil DeReimer |
| 2/1/2011 | Update from Neil DeReimer |
| 3/1/2011 | Update tabled to 3/8 |
| 3/8/2011 | Update from Neil DeReimer |
| 3/24/2011 | American Rivers/NOAH grant denied |
| 4/5/2011 | Update from Neil DeReimer |
| 5/10/2011 | Update from Neil DeReimer |
| 6/7/2011 | Update from Neil DeReimer |
| 7/12/2011 | Update from Neil DeReimer |
| 8/9/2011 | Update from Neil DeReimer |
| 11/1/2011 | Update from Neil DeReimer and see attached |
| 12/6/2011 | Update from Neil DeReimer |
| 12/9/2011 | Submited grant application to Americn Rivers (decision by 3/9/12) |
| 1/3/2012 | contacted PADEP about meeting |
| 2/7/2012 | Conference call with DEP scheduled for 2/2/12 |
| 3/7/2012 | Contract with Walsh executed on 2/7. Status report attached |
| 4/3/2012 | Status report attached |
| 5/1/2012 | Status report attached |
Rick Smith
From: Adam Brower <Abrower@ebwalshinc.com>
Sent: Thursday, April 26, 2012 1:58 PM
To: Rick Smith
Subject: Hershey Mill Dam Update
Rick:
So that you can update the Board on progress for getting permitting ready, the following is where we stand:
- The geotechnical engineer is scheduled to perform soil testing tomorrow (weather pending) to determine the subgrade bearing strength for the new fill on top of the berm.
- They are set up to perform the initial structural design as soon as the testing is completed.
- We hope to have a preliminary design ready for presentation by May 9 th .
Let me know if you have any questions.
Adam
1
HMD
Rick Smith
From: [redacted email]
Sent: Thursday, April 26, 2012 3:38 PM
To: 'Rick Smith'
Subject: RE: Hershey Mill Dam Update
Rick,
We are waiting until we get the elevation showing the secondary emergency spillway rendering/photo shopped picture for our flyer.
I think Adam is close to having it done.
Neil
From: Rick Smith [redacted email]
Sent: Thursday, April 26, 2012 2:47 PM
To: [redacted email]
Subject: FW: Hershey Mill Dam Update
Neil
Any update?
rick
From: Adam Brower [redacted email]
Sent: Thursday, April 26, 2012 1:58 PM
To: Rick Smith
Subject: Hershey Mill Dam Update
Rick:
So that you can update the Board on progress for getting permitting ready, the following is where we stand:
- The geotechnical engineer is scheduled to perform soil testing tomorrow (weather pending) to determine the subgrade bearing strength for the new fill on top of the berm.
- They are set up to perform the initial structural design as soon as the testing is completed.
- We hope to have a preliminary design ready for presentation by May 9 th .
Let me know if you have any questions.
Adam
1
EAST GOSHEN TOWNSHIP
ACTION ITEM
Item: Post Retirement Medical Benefits
No: ADM 11-16
List Date: 2/17/2011
Completed Date:
Description: Determine how to finance Post Retirement Medical Benefits for WEGO
| Date | Action |
|---|---|
| 6/7/2011 | We can utilize the same process that the Police Commission uses. The Commission currently deposits $66,000 a year to this fund. You just need to create by resolution a separate fund that would be held in East Goshen Township's name. . The question is "how much do you want to deposit to the fund. annually?". We are responsibile for ~56% of the liability. |
| 6/14/2011 | We had a report done as of the end of 2010. Te Commission's liability as of 12/31 is $5,111,714. We are currently pay. We would need to contribute 56% of $852,849 if we wanted to satisify the liability in 10 years, 56% of $599,80 if we wanted to satisfy it in 20 years and 56% of $520,652 if we went with 30 years. |
| 7/26/2011 | Solicitor has drafted the trust agreemtent and needs to discuss with Rick prior to forwarding to the BOS |
| 8/9/2011 | Review trust agreement and ordinance |
| 8/16/2011 | Review second draft of the trust agreement and ordinance |
| 9/6/2011 | Ordinance hearing on 9/6/11. Need to select trustees, execute agreement and hire a fund manager. |
| 9/6/2011 | Ordinance adopted. |
| 10/4/2011 | See attached |
| 11/1/2011 | The Pension Committee will meet on Wednesday and make recommendations on trustee and fund manager |
| 12/6/2011 | The Pension Committee will meet on Wednesday and make recommendations on trustee and fund manager |
| 1/10/2012 | The Pension Committee will meet on Wednesday. Recommendation will be on the 1/17 BoS agenda. On 1/17 the Bos tabled action on reccomendation and requested the committte to consider stop loss insurance |
| Date | Action |
|---|---|
| 2/7/2012 | The Pension Committee Recommendation |
| 4/3/2012 | The Pension Committee is reviewing Investment Policy Statement |
| 5/1/2012 | The Pension Committee is expected to execute Investment Policy Statement on 5/2 |
EAST GOSHEN TOWNSHIP
ACTION ITEM
Item: TAG Action List
No: ADM 10-22
List Date: 12/7/2010
Completed Date:
Description: Complete action items on TAG list
| Date | Action |
|---|---|
| 12/7/2010 | Review list |
| 1/3/2011 | Updated summary is attached |
| 1/18/2011 | Updated summary is attached |
| 2/1/2011 | Updated summary is attached |
| 2/22/2011 | Updated summary is attached |
| 3/1/2011 | No change from summmary issued for 2/22/11 meeting |
| 3/15/2011 | Updated summary is attached (report has been reformatted) |
| 4/5/2011 | Updated summary is attached |
| 4/19/2011 | Updated summary is attached |
| 5/3/2011 | Updated summary is attached |
| 5/24/2011 | Updated summary is attached |
| 6/7/2011 | Updated summary is attached |
| 6/21/2011 | Updated summary is attached |
| 7/12/2011 | Updated summary is attached |
| 8/9/2011 | Updated summary is attached |
| 10/4/2011 | Updated summary is attached |
| 11/1/2011 | Updated summary is attached |
| 12/6/2011 | Updated summary is attached |
| 1/7/2012 | Updated summary is attached |
| 2/7/2012 | Updated summary is attached |
| 3/6/2012 | Updated summary is attached |
| 4/3/2012 | Updated summary is attached |
| 5/1/2012 | Updated summary is attached |
TAG Recommendation Summary
4/3/12
| ID | Item | Votes | Board Member | Staff Member | Due Date | Comments |
|---|---|---|---|---|---|---|
| 9 | Implement a Fully Integrated Cost Accounting System (108) | 2 | Senya/Marty | Deb | 3/31/2011 | Accounts are in budget/apyroll |
| 2 | Merit Compensation | 1 | Rick | 6/30/2011 | Revised RFP on 5/1 agenda | |
| 15 | Assess/Replace HVAC System (95) | 4 | Carmen | Rick | 6/30/2011 | Working on loan application |
| 18 | Work with Adjoining Townships for IT Support (116) | Don | Rick | 6/30/2011 | WCACOG conducted a survey - Reviewing info on Cloud | |
| 3 | Minimize Community Vacancy | Senya | Mark G. | Created CDC | ||
| 24 | Police Negotiations | Rick | 1/1/2012 | Contract up 12/13 | ||
| 26 | Two Tier Wage & Benefits Scale for Police Officers (120) | Rick | 1/1/2012 | Review and discuss. Could be improved upon. | ||
| 14 | Solar Array (94) | Rick | 1/30/2012 | Back burner. Revisit in 6 mths | ||
| 39 | Maintain Ownership of Wastewater Treatment Plant (85) | 2 | Marty | Rick | On hold until all PS projects are done |
Completed items have been removed
F:\Data\Shared Data\ABC'S\Board of Supervisors\TAG Action List\Summary 050112.xls 4/26/2012
16a
Memo
To: Board of Supervisors
From: Nancy Scheiderman
Re: Request for Information
Date: April 25, 2012
Quarterly Report Jan – Apr 2012
65 requests for information were received. The information requested breaks down into the following categories:
42 – Emails and correspondence regarding Park & Rec resignations
2 – Environmental issues
1 – EGT Code regarding decks
6 – Permits
1 – Minutes and Zoning Hearing regarding Malvern Institute
1 – Township financial records for 2011, 2012
1 – 1038 Hershey Mill Rd
2 – 2011 ABC Appreciation Event & Park & Rec Ord (to disband P&R Board)
4 – 2008, 2009, 2010, 2011 ABC Appreciation Event
1 – Applebrook Park – Declaration of Covenants, Conditions and Restrictions
1 – Equipment invoices
1 – Equipment purchased
1 – Park Ord - Invoices for legal, advertising, stenographic
1 – 2011 ABC Appreciation Event & Park Ord
F:\Data\Shared Data\Admin Dept\RFI\2012\Q Report Jan - Apr 2012.doc