Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
TUESDAY, AUGUST 24, 2010
7:00 PM

  1. Call to Order
  2. Pledge of Allegiance/Moment of Silence
  3. Ask if Anyone is Recording the Meeting
  4. Public Comment – Hearing of Residents (Optional)
  5. Approval of Minutes August 10, 2010
  6. Chairman’s Report Announce that the TAG will hold a meeting on September 8 at 7:00 PM to solicit comments and suggestions from residents on how to improve the Township’s financial position.; Greg Cary of PECO will update the Board on PECO’s procedure for restoring electric service after an outage.
  7. Public Hearings - None
  8. Staff Reports Treasurers Report
  9. Old Business Action List; Review Hershey Mill Dam Cost Estimates.; Review recommendation on printers.; Wireless Communication Facilities in East Goshen Township.
  10. New Business Consider approval for installation of a generator for the Public Works Annex.; Consider approval of purchase of three new 4 Post Feeders and a new trail camera for the Deer Tick Program.; Review Refuse Specs; Decide if meeting on 8/31/10 is needed; Consider approval for Public Works truck repairs.
  11. Any Other Matter
  12. Correspondence, Reports of Interest

F:\Data\Shared Data\Agendas\Board of Supervisors\2010\082410.doc

  1. August 11, 2010 letter of commendation to Chief Dumond from District Attorney's Office of Chester County for Victims Compensation Assistance Program
  2. Acknowledge receipt of monthly permit log.

13. Meetings & Dates of Importance

Date Meeting / Event Time
August 31, 2010 Board of Supervisors 7pm (if needed)
September 1, 2010 Planning Commission 7 pm
September 1, 2010 TAG 7 pm
September 2, 2010 Park & Recreation 7 pm
September 6, 2010 Labor Day - Office Closed
September 7, 2010 Board of Supervisors 7 pm
September 8, 2010 Conservancy 7 pm
September 8, 2010 TAG 7 pm
September 9, 2010 Historical 7 pm
September 13, 2010 Municipal Authority 7 pm
September 14, 2010 Board of Supervisors 7 pm
September 15, 2010 TAG 7 pm
September 21, 2010 Board of Supervisors 7 pm
September 22, 2010 Zoning Hearing - Liberty Towers 7:30 pm
September 28, 2010 Board of Supervisors 7 pm
  1. Public Comment – Hearing of Residents
  2. Adjournment

F:\Data\Shared Data\Agendas\Board of Supervisors\2010\082410.doc

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 Paoli Pike, West Chester, PA 19380
August 10, 2010 – 7:00pm
Draft Minutes

Present: Chairman Senya D. Isayeff, Vice-Chairman Thom Clapper, Supervisors Carmen Battavio, Marty Shane and Don McConathy. Also present were Township Manager Rick Smith, Phyllis Marron (Park & Rec), Kathryn Yahraes (Historical Commission), Jim McRee (Deer Committee & Planning Commission), Bryan DelMonte and Jane Fava (Conservancy Board).

Call to Order & Pledge of Allegiance

Senya called the meeting to order at 7:01pm and led everyone in the Pledge of Allegiance.

Moment of Silence

Carmen called for a moment of silence to honor the men and women serving their country in the armed forces and their families.

Recording of Meeting

No resident indicated they planned to record the meeting.

Chester County Conservation District Grant for Applebrook

Jane Fava requested Board approval to apply for a Chester County Conservation District grant to establish riparian buffer areas along the Ridley Creek within Applebrook as suggested by the Natural Lands Trust Report. Jane said the Township would not be required to put in any money, and Park & Rec has been consulted and they are on board.

Marty moved to approve the application for a Chester County Conservation District grant as described by Jane Fava. Carmen seconded the motion.

Public Comment: Jackie Webber, 60 Line Road – Expressed concern that if the grant is approved the trees will be planted too close together like they are near Line Road and Paoli Pike. Jane said the trees will be planted in accordance with U.S. Forest Service guidelines.

Review & Approval of Minutes

The Board reviewed and corrected the draft minutes of July 27. Marty moved to approve the minutes of July 27, 2010 as corrected. Don seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Chairman’s Report

Senya announced the following:

  • The 2011 Minimum Municipal Obligation is $149,211 for the Non-Uniformed Pension Plan and $49,103 for the Fire Pension Plan.
  • The Board met in Executive Session on July 27 to discuss a personnel matter.

8/17/2010 8/10/10 BOS Minutes Page 1 of 10

  • Resident Judy Schaeffer is interested in the vacancy on the Historical Commission. Ms. Schaeffer was interviewed by the Board on a prior occasion. Kathryn Yahraes said Ms. Schaeffer currently serves as a non-voting member of the Historical Commission and has volunteered at the Plank House for two years. Kathryn said all members of the Historical Commission are in favor of Ms. Schaeffer being appointed. Marty moved to appoint Judy Schaeffer to fill the vacancy on the Historical Commission. Don seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
  • PECO will be upgrading their facilities on Line Road and East Strasburg Road. Senya had Rick describe the planned upgrade.

Public Comment: Jim McRee, Oneida Lane – Said he wants PECO to do the same kind of work in an area near his neighborhood. Don offered to give Mr. McRee the name and phone number for someone at PECO to contact in this regard.

Public Comment: Neil DeRiemer, Hershey Mill Road – Asked if PECO is burying cable that is currently aerial, and Rick said no.

  • PennDOT will begin work on the Paoli Pike Closed Loop. Senya had Rick describe the work involved.

Bills

Current invoices were reviewed.

Treasurer’s Report & Expenditure Register Report

See attached Treasurer’s Report for June 10, 2010.

Thom moved to accept the Treasurer’s Report of August 5 and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed with the exception of #K0238201 from the Light House if Rick’s research finds it to be a duplicate. Don seconded the motion.

Public Comment: Joe Buonnano, Herron Lane – Asked about the noted listed next to “Payroll” on the Treasurer’s Report indicating severance pay. Rick said Mr. Gill was paid severance for the month of August.

There was no further discussion and no public comment. The Board voted unanimously to approve the motion.

ARCView System (GIS)

Rick reported that it appears it will be most cost effective to continue addressing GIS needs in-house as needed, and to utilize Yerkes Associates for professional GIS consulting services when necessary.

8/17/2010 8/10/10 BOS Minutes Page 2 of 10

Outsourcing of Public Works Services

Rick reported he is currently working on bid specs, which he expects to go out in mid-September.

Consideration of Sale of Hershey Mill Dam

Rick said before the Board starts discussing all the details of selling the dam, the Supervisors first need to decide whether they would even be willing to consider selling the dam.

Marty moved to advertise the dam for sale to see what kind of response the Township gets. The ad and the bid specs will need to be reviewed by the Township Solicitor. The ad must state that 1) the Township will be held harmless after the sale; 2) the buyer will continue to allow public access to the dam; and 3) the buyer will take on the responsibility of dealing with DEP in regard to their requirements for the dam. Carmen seconded the motion.

Thom said he wants to get an appraisal of the dam instead of putting it out to bid. Don said he believes the Township needs to advertise the dam for sale in order to protect the Township from allegations of acting inappropriately (only dealing with one potential buyer). Rick said Chester County has assessed the value of the land at $16,450.

Public Comment: Neil DeRiemer, Hershey Mill Road – Said the letter he received from the Township in response to his offer to buy the dam contained conditions not mentioned in the motion. The Board explained that they have heard back from the Township Solicitor since they sent him the letter, and the three conditions in the motion are the only ones necessary based on the opinion of the Township Solicitor.

Public Comment: Maureen Neuhaus, Foxglove Lane – Had some questions about the location of the easement and access to it, which Rick answered. Rick confirmed that there is no automobile access to the dam. Ms. Neuhaus expressed concern that a potential buyer could do anything with the land, including turning it into an amusement park. Rick told Ms. Neuhaus that if sold, the property would be subject to the same restrictions as Township Open Space.

Public Comment: Fran Beck, Foxglove Lane – Asked if someone could fence off the easement if it runs on their property. The Board told him no; public must have access to the easement.

Public Comment: John Schorn, Larch Lane – Said he thought the Township required a 50-ft buffer zone that would restrict fencing. Rick said that applies to new developments only.

Public Comment: Joe Buonnano, Herron Lane – Asked if the $92K spent thus far on engineering costs will be included in the purchase price if the dam is offered for sale. Marty said he thought about that but concluded it would probably preclude the sale of the dam. He noted that even if the Township ends up paying all the money spent thus far, it will still be less than the cost of repairing or breaching the dam. Mr. Buonnano said the Township should disclose to a potential buyer what they are getting into. The Board agreed with him. Rick noted that all the records of the dam, the engineering studies, etc. are available to anyone as part of the public record. Marty said the advertisement would also reference the situation with DEP.

8/17/2010 8/10/10 BOS Minutes Page 3 of 10

Don said he wants a legal opinion on whether the cost of the engineering work currently being done by Advanced GeoServices in regard to the dam should be included in the sale price.

Public Comment: Neil DeRiemer, Hershey Mill Road – Said there are two spots on his property where visitors to the dam can park automobiles.

Public Comment: Jim McRee, Oneida Lane – Asked if there is a risk to the Township if the buyer has no assets and cannot afford to bring the dam into DEP compliance. Carmen said the Township Solicitor informed the Board that in the event of a sale, the Township would have no further liability for the dam. Marty noted that the Township would only entertain offers from responsible bidders or bona fide organizations.

Public Comment: Neil DeRiemer, Hershey Mill Road – Told Mr. McRee that the property would be purchased by a dam preservation group and would not be owned by him personally.

Public Comment: Maureen Neuhaus, Foxglove Lane – Said that just because a party responds to an ad doesn’t mean the Township must accept their bid. The Board told her that was correct.

The Board voted 3:2 against the motion. (Senya, Thom, and Don were opposed.)

Thom then moved for the Township to get an appraisal of the dam. If the appraisal comes in at less than $1,500 the Township should proceed to negotiate directly with Neil DeRiemer or the organization that he represents that desires to purchase the dam. Marty seconded the motion but asked that if the appraisal comes in over $1,500 the Board proceed to advertise the dam for sale. Thom accepted this amendment. The Board voted and the motion passed 4:1. (Don was opposed).

Rick said he received two proposals for appraisals of the dam. One would cost $2,500. The other would cost $1,750 but the appraiser agreed to reduce the fee to $250 as a public service to the Township.

Marty moved to accept the proposal from Carmody (?) for an appraisal of the Hershey Mill Dam in the amount of $250. Thom seconded the motion.

Public Comment: Jim McRee, Oneida Lane – Asked if the appraisal will cover only the value of the land, or will it take into account the cost of the work needed on the dam. Marty said that per Thom Clapper, the appraiser will take the needed dam work into consideration when doing the appraisal.

There was no further public comment or discussion. The Board voted unanimously to approve the motion.

Consideration of Refuse/Recycling Option(s)

Senya had Rick summarize the various options the Board wanted bid for trash hauling and recycling. Don said he thinks the administrative costs need to be factored into Option 5, and then he questioned whether the low bidder for Option 5 is a responsible bidder.

8/17/2010 8/10/10 BOS Minutes Page 4 of 10

Senya moved that the Board consider going with Option 1 or Option 2. (The motion was not seconded).

Thom said he is concerned that a weekly pickup will not be enough. Food will be left sitting out, and rodents and insects may become a problem. Carmen said he liked Option 5 because it has a fairness factor – residents would pay for the service they use, but he agreed with Don that the administrative expenses may negate any savings.

Marty said he liked Option 5 because it is fair, and it also encourages recycling. He agreed there may be some administrative expense issues associated with Option 5 at first if it is selected, but he thinks they will die down in time. Option 5 is attractive because the cost savings are so substantial and it’s better for the environment.

Carmen proposed that the Board select an attractive option or two, and then rebid the contract. Marty said he is reluctant to rebid, as the bids may go up. He would rather deal with the bids already received than risk a price increase.

Don said he is concerned that a once per month pickup of yard waste is not adequate.

Public Comment: Maureen Neuhaus, Foxglove Lane – Asked if residents could have more than one trashcan if the once weekly pickup is selected by the Board. Don said it depends on what option is selected.

Public Comment: Joe Buonnano, Herron Lane – Said everyone should pay the same rate for trash pickup and recycling.

Public Comment: Shirley Fox, East Boot Road – Said she doesn’t want the Township involved in trash pickup. She would rather the residents be allowed to contract individually with haulers of their choice for the amount of service they require.

Public Comment: Eric Meyer, Monte Vista Drive – Said it’s better to have one hauler for the Township than multiple haulers driving through the Township every day of the week.

Public Comment: John Schorn, Larch Lane – Said the Township should allow residents the choice of opting out of participation in trash collection service.

Public Comment: Maureen Neuhaus, Foxglove Lane – Said it would not be neighborly for some residents to opt out, as the rates for everyone else would be increased.

Public Comment: Jim McRee, Oneida Lane – Said he is strongly in favor of the Board selecting Option 1, and he is opposed to them selecting Option 5.

Public Comment: Al DiGenera, Deputy Counsel for J. P. Mascaro & Sons – Said that the Township would do best to go with Option 1 or Option 2. He said the Township should not even consider Option 4, and Option 5 will be an administrative headache. He said if the Township is going to allow residents to opt out, then East Goshen should not be involved in trash pickup.

8/17/2010 8/10/10 BOS Minutes Page 5 of 10

Marty noted for the record that J. P. Mascaro & Sons was the low bidder for Option 1 and Option 2, and did not bid on Options 3, 4, or 5.

Public Comment: Jim Clarke of A. J. Blosenski, Inc. – Said that allowing an unlimited option will discourage recycling.

Public Comment: Ken Anderson of BFI Waste Services – Encouraged the Township to rebid the contract once they select their options. He noted that the last time the Township rebid the trash contract it resulted in a lower cost.

Public Comment: Sam Augustine of J. P. Mascaro & Sons – Recommended the Board go with Option 2.

Carmen moved to selection Option 2, which is unlimited pickup once per week. Marty seconded the motion.

Don said that before he decides on an option, he needs to see all the information from the Township Solicitor and he needs time to read all the letters from the various bidders that just came in.

Thom said he is concerned that once weekly pickup will not be adequate. Don said he is concerned that once monthly pickup of yard waste will not be adequate.

Public Comment: Jackie Webber, 60 Line Road – Said she lives in East Goshen less than six months out of the year and it is not fair that she has to pay for a full year of service. She said she would like to be able to opt out of trash pickup service.

Public Comment: John Schorn, Larch Lane – Said the Board should select a couple of options and rebid the contract.

Public Comment: Ken Anderson of BFI Waste Services – Said he “implored” the Board not to vote on an option until they have all the information in front of them.

Public Comment: Jim McRee, Larch Lane – Said Option 1 is his favorite but Option 2 would be okay too. He suggested the Township consider making provision for residents who miss their once weekly pickup due to vacations, etc.

Marty then withdrew his second to Carmen’s motion.

Senya said the Board’s task is to decide what is best for the Township residents.

Senya said he would like to amend Carmen’s motion by adding Option 1, and the Board should study the two options further for the next meeting. Thom said he wanted Option 5 added to the motion for consideration. Senya withdrew his amendment to the motion and suggested the Board table this matter until next week due to the late hour and the lack of consensus.

8/17/2010 8/10/10 BOS Minutes Page 6 of 10

Don said he wants the Board to receive copies of the bid documents in their next packet.

Resolution 10-09A – Public Meeting Schedule

Marty moved to adopt Resolution 10-09A establishing the public meeting schedule for the Township. Don seconded the motion.

Thom said he was puzzled how his simple request to vote on matters as they were discussed led to this point where workshops are done away with and now there has to be a resolution to memorialize it.

Public Comment: Jim McRee, Oneida Lane – Had a question about the advertisement of Planning Commission meetings, which the Board answered.

The Board voted 4:1 to pass the motion. (Thom was opposed).

Resolution 10-22 – Mileage Rate

Don made a few editorial changes and corrections to the document.

Marty moved to adopt Resolution 10-22 as amended. Carmen seconded the motion.

Public Comment: John Schorn, Larch Lane – Asked if this motion is for employees that use their personal vehicles for Township business, and Senya said yes. Mr. Schorn said the Township should monitor this closely to avoid abuse by employees. Don assured Mr. Schorn that the Board closely monitors mileage reimbursement requests.

There was no further discussion or public comment. The Board voted unanimously to approve the motion.

Resolution 10-26, Appointment to the West Chester Regional Planning Commission

Senya moved to appoint resident Al Zuccarello as one of East Goshen’s representatives to the West Chester Regional Planning Commission. Carmen seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

TMACC Membership

Thom moved for the Township not to renew its membership in TMACC. Marty seconded the motion.

Senya said he believes TMACC membership to be of value to the Township. Carmen agreed and said he thinks the Township should continue membership.

Public Comment: Kathryn Yahraes, Vista Drive – Said advocacy groups are really beneficial to townships. They can go to bat for Township as well as keep them informed.

Public Comment: Jim McRee, Oneida Lane – Said the Township should send a letter to TMACC outlining what the Township wants TMACC to do for East Goshen.

8/17/2010 8/10/10 BOS Minutes Page 7 of 10

Public Comment: John Schorn, Larch Lane – Said the Township should not feel obligated to join every group out there, and should examine each organization’s worthiness on a case-by-case basis. However, he believes the Township should continue its membership in TMACC.

There was no further discussion or public comment. The Board voted 4:1 against the motion. (Thom was in favor.)

Carmen then moved to renew the Township’s TMACC membership for one year at a cost of $1,200. Don seconded the motion. There was no discussion or public comment. The Board voted 4:1 to approve the motion. (Thom was opposed).

Variance Request – Charles Weber, 1440 Center Street

No one was present for the applicant.

Don moved to recommend the Zoning Hearing Board approve the dimensional variance request for the property owned by Charles Weber at 1440 Center Street as described in the application, plot plan and plan sheets A1 through A3, §240-10.G for Maximum Lot coverage by buildings, Maximum Lot coverage – Total and Minimum Front Yard due to the following: The property is an existing nonconforming structure; the property has unique physical characteristics, and the property cannot be improved with strict conformity to the ordinance. The hardship has not been created by the applicant; the relief sought will not alter the character of the neighborhood, and the relief sought is the minimum required to afford relief from the dimensional regulations. Thom seconded the motion.

Carmen said he is in full support of this request.

Don said he realized that the applicant was not present because he had been told the Board would vote on this during the August 17 meeting.

Public Comment: Jim McRee, Oneida Lane – Expressed concern that any neighbors opposed to the variance will not have the opportunity to be heard, if they think the Board is not voting until next week. The Board told Mr. McRee that neighbors may still come on the 17th and the Board will hear them, and if there is a compelling reason the Board can reconsider its recommendation to the Zoning Hearing Board.

There was no further discussion or public comment. The Board voted unanimously to approve the motion.

Timeline for Pension Plan Conversion

Marty moved to accept the timeline proposed by attorney Sarah K. Ivy for the freezing of the current pension plan and establishment of a new pension plan for the non-uniformed employees of East Goshen Township. Don seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

8/17/2010 8/10/10 BOS Minutes Page 8 of 10

Any Other Matter – Meeting with Barbara McIlvaine-Smith

Senya said the Township received a request from Barbara McIlvaine-Smith’s office wanting to meet with the Board and Rick. The Board indicated they would prefer a lunchtime meeting. Senya and Rick will schedule a suitable date.

Public Comment: Neil DeRiemer, Hershey Mill Road – Wanted to know if the public could attend this meeting. Carmen said residents could attend but no public input would be accepted. Rick added that the Township would not be providing lunch to the residents. Don said he would like to get an opinion from the Township Solicitor on whether the meeting should be open to the public, etc.

Any Other Matter – New Meeting Format

Marty said he thinks the Board should review minutes and bills at the end of meetings. Rick said it is the Chairman’s prerogative to rearrange the meeting schedule at his discretion. Don said if the Chairman is going to rearrange the agenda he would like it done ahead of time so the agenda can be revised accordingly, not done the night of the meeting at the last minute.

Correspondence & Reports of Interest

Rick reported the Township received the following items:

  • July 21, 2010 letter from PA DEP approving the Remedial Action Plan for the Sunoco Station at 1425 Paoli Pike.
  • July 20, 2010 letter from PA DCED advising that the Township’s application for a grant of $15K for repairs to the Hershey Mill Dam has been recommended for preliminary approval.
  • July 2010 Fire Marshal Report.
  • July 27, 2010 letter from resident Neil DeRiemer concerning the sale of the Hershey Mill Dam.
  • July 28, 2010 letter from resident Neil DeRiemer concerning the draining of the pond at the Hershey Mill Dam.
  • July 28, 2010 letter from resident Karen DeRiemer concerning the draining of the pond at the Hershey Mill Dam.

Public Comment: Fran Beck, Foxglove Lane – Asked for clarification on the grant of $15K for repairs to the Hershey Mill Dam. Rick described the grant.

Public Comment: John Schorn, Larch Lane – Asked if the Township is overseeing the Sunoco issue or is the Township relying solely on Sunoco. Rick said he is keeping an eye on the situation. Mr. Schorn said it appears to him that Sunoco and DEP have a relationship that is too cozy, and he does not trust them. He said he wants the Township to take a more active role in the situation. Carmen told Mr. Schorn the Sunoco issue is on the Board’s Action List.

8/17/2010 8/10/10 BOS Minutes Page 9 of 10

Public Comment: Jim McRee, Oneida Lane – Had a question about an entry on the Fire Marshal Report.

Meetings & Dates of Importance

Senya noted the upcoming meetings as listed on the agenda.

Public Comment Period

Maureen Neuhaus, Foxglove Lane – Said there is a blind spot on northbound Route 352 and it is difficult to make a left turn onto Greenhill Road. She asked if a green left-turn arrow could be added to the traffic signal. Marty said he did not think that intersection would meet the required warrants to be upgraded with a turn signal. He added that there are not many accidents at that intersection. Ms. Neuhaus then asked if the Township could have the trees trimmed at an intersection near Immaculata College as they are impeding visibility. Rick told her he would have the Public Works Department take care of it tomorrow.

John Schorn, Larch Lane – Said he likes the new meeting format.

Kathryn Yahraes, Vista Drive – Said she thinks the new meeting format can work.

Adjournment

There being no further business, the meeting was adjourned at 10:40pm.

Anne Meddings
Recording Secretary
Attachment: Treasurer’s Report

8/17/2010 8/10/10 BOS Minutes Page 10 of 10

EAST GOSHEN TOWNSHIP
ACTION LIST

# Item Action Due Date
DPW 07-02Hershey's Mill Dam24-Aug-10
DPW 08-06Recycling Contract24-Aug-10
ADM 10-13Sewer Metered Billing24-Aug-10
FIN 10-03Monthly Financial Reports24-Aug-10
ADM 09-07Web Site Upgrade Status7-Sep-10
DPW 08-04Invasive Species7-Sep-10
DPW 09-03Road Resurfacing7-Sep-10
FIN 09-03Historic Books7-Sep-10
FIN 10-06Friends of East Goshen Township 501c37-Sep-10
PCZ 09-06WCF Tower @ Township Building7-Sep-10
PCZ 10-03Generator Installations7-Sep-10
DPW 10-02Ridley Creek Expansion Monthly Update14-Sep-10
ADM 07-01Review Wireless Ordinance14-Sep-10
ADM 07-02Pension Plan Conversion14-Sep-10
ADM 09-02Records Retention Resolution (Email System)14-Sep-10
ADM 09-05Energy Conservation in Twp Bldg14-Sep-10
ADM 10-04Information Systems Analysis14-Sep-10
ADM 10-16Performance Evaluations14-Sep-10
ADM 10-19USDA Geese Round Up14-Sep-10
DPW 10-04Pedestrian Crosswalk @ Township Park14-Sep-10
FIN 10-07Municipal Authority Funding14-Sep-10
DPW 07-04Park Bridge Permit21-Sep-10
ADM 10-07Printers21-Sep-10
PCZ 06-01Parking for Multi-Use Space in IP/BP District21-Sep-10
PCZ 10-01CTDI Parking21-Sep-10
PCZ 10-04Lieberman Early & Co21-Sep-10

1 of 2 8/17/10

# Item Action Due Date
FIN 09-02Capital Reserve Fund Analysis24-Sep-10
DPW 08-01Public Works Service Outsourcing28-Sep-10
ADM 08-02Review Comp Plan Action List (Ch 10)5-Oct-10
ADM 09-04Quarterly Review of Right to Know Requests5-Oct-10
ADM 09-08Police Scheduling5-Oct-10
ADM 10-03Township Advisory Group5-Oct-10
ADM 10-07Staffing Analysis5-Oct-10
FIN 10-02Services List5-Oct-10
ADM 10-02Annual Training Plan7-Oct-10
DPW 08-02Quarterly Report on I&I12-Oct-10
DPW 10-01Tree Vitalize Grant (Conservancy)12-Oct-10
FIN 09-01Quarterly Summary of Pending Legal Cases13-Oct-10
ADM 10-15Resolutions Book19-Oct-10
ADM 10-7Emergency Operations Plan22-Oct-10
FIN 10-05Quarterly Financial Reports - 201028-Oct-10
ADM 09-13ABC Appreciation Event Guest List2-Nov-10
ADM 09-10Soccer Fields @ Line Road7-Dec-10
DPW 07-01Geese Management Program7-Dec-10
ADM 10-01Employee Benefits19-Dec-10
PCZ 09-01Telecom Registration and Reporting16-Feb-11

2 of 2 8/17/10

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Hershey's Mill Dam No: DPW 07-02

List Date: 5/22/2007 Completed Date:

Description: Bring Dam into compliance with DEP requirements or dispose of dam

Date Action
Grant declined. Committee formed to determine best option. Classification probably not changing. Hydrologic Study by advanced Geo Services.
4/6/2010 Groups met 4/5. Board to discuss 4/13/10
4/13/2010 Should we proceed with AGS or rebid work. What should be included in next phase of engineering work?
5/4/2010 Advanced GEO Proposal for breech analysis and potential solutions.
6/1/2010 Awaiting comments from Save the Dam group before taking action on GEO proposal.
Phase 1 approved.
7/6/2010 Impoundment drained 6/30. Conceptual plans due for 7/20 meeting. Cost estimates due for 8/17.
7/13/2010 Solicitor OK with sale of Dam property. Checking with DEP.
7/20/2010 Options presented by Adv Geo. Pipe option out. Will price weir, breech, silt removal, ongoing maintenance, and check if required to remove silt under any scenario.
8/10/2010 Accepted proposal to have an appraisal done.
Tentative award of $15,000 grant
8/17/2010 Authorized applying for grants to breach the dam
8/24/2010 Review cost estimates

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Recycling Contract No: DPW 08-06

List Date: 9/22/2009 Completed Date:

Description: Current Contract expires 12/31/2010

Date Action
Investigate possible change of pick up to 2nd half of week and cost of collecting Compact Fluorescent Lamps (CFL's)
7/13/2010 Bids out. 5 Options Open bids 7/22.
7/27/2010 Bid results. Discuss options for 2011.
7/22/2010 Opened Bds
8/10/2010 Review options
8/17/2010 Additional info on rates
8/17/2010 Rejected att bids
8/24/2010 Review revised bid specs

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Monthly Financial Reports No: FIN 10-03

List Date: 2/16/2010 Completed Date:

Description: Provide Board with montly financial reports

Date Action
3/23/2010 Provide General Fund operating results. Done
5/25/2010 Provide General Fund operating results. Done
6/22/2010 Provide General Fund operating results. Done
8/24/2010 Provide General Fund operating results. Done
9/28/2010 Provide General Fund operating results.
11/23/2010 Provide General Fund operating results.
12/21/2010 Provide General Fund operating results.

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Sewer Metered Billing No: ADM 10-13

List Date: 4/6/2010 Completed Date:

Description: Remaining Issues for New Process.

Date Action
4/6/2010 Need to revise Ordinance to allow Twp to charge for Permit and Inspection.
What are costs associated with reading meters if installed?
What will be procedure and frequency of meter reading?
4/20/2010 Discuss ordinance and reading costs. Bills are out.
4/27/2010 Meter Reading costs revised.
5/4/2010 Ordinance and Resolution for permits and fees. Further discuss charges for meter reading.
5/25/2010 Equipment received. Application forms and procedures being finalized.
Will be added to web site when complete.
6/1/2010 Status report from Joe.
8/24/2010 Status after Q3 billings. And stats on # of accts went up and # down from Q1

A complete copy of this report is available at the “For Your Information” section of the Township Web Page.

ADVANCED GeoServices
Engineering for the Environment. Planning for People.
1055 Andrew Drive, Suite A
West Chester, PA 19380-4293
tel 610.840.9100 fax 610.840.9199
www.advancedgeoservices.com

August 19, 2010

2009-2484-1B

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

[Seal] RECEIVED BY: AUG 20 2010

Attention: Mr. Rick Smith, Township Manager

Reference: Opinion of Costs
Hershey Mill Dam

Dear Mr. Smith:

Enclosed are Opinion of Costs for both restoring and breaching the Hershey Mill Dam in East Goshen Township, Chester County, Pennsylvania. The Opinion of Costs were prepared by Advanced GeoServices as requested by the Board of Supervisors at the July 20, 2010 East Goshen Township public meeting.

During the public meeting, Advanced GeoServices presented options to the restore the Hershey Mill Dam (Dam) as well as a discussion on breaching the Dam. The options presented to restore the Dam included enlarging the spillway and installing culverts. At the close of our presentation, the Board of Supervisors requested that Advanced GeoServices provide an opinion for both capital and operation/maintenance costs for enlarging the spillway as well as for breaching the Dam.

The Opinion of Costs presented herein are being provided to East Goshen Township for planning and budgeting purposes only. They reflect a level of precision based solely on the preliminary development of the options presented on the enclosed figures and by Advanced GeoServices at the public meeting, and on the preliminary nature of the assumptions made to develop the costs. The actual costs may change or be different based on further discovery/development of the chosen option during the design and construction phases of the project.

In addition, Advanced GeoServices makes no guarantee or representation that the costs presented will accurately predict actual bids from prospective contractors. Actual bids submitted may be lower or higher as a result of market conditions, the competitive bidding process, and variations in construction methods as well as material, equipment and labor costs.

A brief description of the concept of each option as well as a discussion of the Opinion of Costs is provided below.

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

Mr. Rick Smith
2009-2484-1B
August 19, 2010
Page 2 of 7

DESCRIPTION OF OPTIONS

Restoring the Dam (Enlarging the Spillway)

The existing spillway is 22 feet wide and passes about 189 cubic feet per second (cfs) of flow before the Dam is overtopped. In order to pass the required design flood (100-year storm) of 1,089 cfs, Advanced GeoServices is proposing to enlarge the spillway to a minimum 74-feet width and to raise/level the top of the Dam to elevation 450.5.

  • The existing Dam embankment will be raised to elevation 450.5 by placing soil fill within the existing reservoir as well as on the Dam crest. Portions of the face of the inside slope of the new embankment fill (facing the reservoir) will be covered with rip rap to provide long-term erosion protection.
  • The new spillway slab and associated sidewalls on top of the Dam will be constructed of cast-in-place concrete. The existing spillway slab and adjacent sidewalls on top of the Dam will be demolished to construct the new spillway slab/sidewalls. In addition, sections of the earthen embankment and the existing stone/masonry face of the Dam will be lowered to accommodate the elevation of new spillway slab.
  • As required by the PADEP Division of Dam Safety, the restoration of the Dam will require removal of the trees on the Dam embankment. The removal of trees and associated roots and stumps may damage the existing stone/masonry face of the Dam. In addition, due to its current condition/construction, portions of the existing stone/masonry face will not accommodate/withstand flow from the new spillway slab. Lastly, the existing stone/masonry face has deteriorated and portions may have been undermined by scour. Therefore, in conjunction with the expansion of the spillway, Advanced GeoServices believes that the existing face of the Dam should be encapsulated or replaced with a new concrete wall to reinforce the existing structure and extend the life of the Dam.

At this time, we believe that the most practical, efficient, and least disruptive method of constructing the new concrete wall for the face of the Dam is to use reinforced shotcrete (i.e., spray-applied concrete). The shotcrete wall will be supported on a new concrete foundation constructed at the base of the Dam. The construction of the new concrete foundation will include filling the existing scour hole at the base of the Dam and providing a concrete splash apron to prevent future scour.

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

Mr. Rick Smith
2009-2484-1B
August 19, 2010
Page 3 of 7

Construction of a conventional gravity retaining wall where the foundation resists the overturning forces would require the foundation of the new wall to extend within (into) the existing embankment (i.e., requiring demolition of the existing structure to rebuild it). In order to avoid the demolition required to build this type of conventional foundation system, a new shotcrete wall can be applied to the existing Dam face and be restrained with soil anchors and/or deadmen constructed within/beneath the existing soil embankment. The necessary extent and magnitude of this type of restraining system can only be determined during the design phase of the project.

At the public meeting, we presented the concept of placing a stone veneer over the new concrete wall to restore the existing aesthetics. However, based on discussions with our Structural Engineer and contractors experienced in dam reconstruction/repair, placing stone on the face of the spillway is not recommended and is very uncommon in spillway repair/reconstruction due to the potential ongoing maintenance from the long-term affects of continual exposure to water flow and temperature changes (freeze/thaw, etc.) on the masonry. In addition, forming the outside face of the concrete (i.e., cast-in-place concrete) and providing anchors for the stone veneer would be required to provide a stable/uniform surface. As an alternative to a stone veneer, we are proposing in these Opinion of Costs that the shotcrete be stained and finished to provide a stone-like appearance. The visible portions of the cast-in-place concrete sidewalls of the spillway on top of the Dam will also be finished with shotcrete in a similar manner.

A conceptual picture of the proposed spillway enlargement is attached as Figure 1. Please keep in mind that the stone/masonry face shown on Figure 1 depicts the existing stone veneer conditions. The actual finish of the shotcrete face will be different. Pictures of stained and textured shotcrete walls are provided as Attachment 1.

Breaching the Dam

Breaching will include removing about 100 feet of the existing Dam embankment and establishing channels and overbank areas (for the two creeks that currently feed the Dam) via sediment removal/disposal and grading within the existing reservoir area. In order to maintain aesthetics, portions of the existing stone/masonry Dam face adjacent to the breach location will be left in place. The two creeks that currently feed the reservoir will be combined into one channel immediately upstream of the breach location.

The reservoir behind the Dam is almost completely filled with sediment. We estimate that the average level of the top of sediment is at about elevation 445.5 (about 13 inches below the level of the existing spillway). A conceptual grading plan for breaching the Dam and for establishing channels and overbank areas for the two creeks is shown on the attached Figure 2. Based on the grading presented, we estimate that the removal of approximately 6,500 cubic yards of sediment from the existing reservoir area will be required.

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

Mr. Rick Smith
2009-2484-1B
August 19, 2010
Page 4 of 7

We believe that the presence of the Dam has also resulted in the deposition of sediment within the two creeks/floodplain areas upstream of the reservoir. In order to prevent disturbance (i.e., sediment removal to re-establish the original creek beds) of the heavily-vegetated floodplain areas upstream of the reservoir limits, the grading plan shows the construction of a check dam within each creek at the upstream edge of the reservoir as well as additional check dams further downstream toward the breach location. The purpose of the check dams is to lower the elevation of each creek channel in a stepwise fashion in order to provide a minimal channel slope through the former reservoir area. The check dams will also create pool areas in the main channels.

The restoration requirements (wetlands, vegetation, trees, rip rap, etc.) within the former reservoir area will be dependant upon the stability of the remaining sediments and preferences of the adjacent residents, East Goshen Township, and other interested parties that will influence the selection of the future use and aesthetics of the former reservoir area. All of these elements are not known at this time.

OPINION OF COSTS: (Enlarging the Spillway)

Opinions for Capital and Operation & Maintenance Costs for enlarging the spillway are discussed below. These costs do not include engineering design, permitting, or construction oversight.

Capital Cost

A Capital Cost of $450,997 is estimated to enlarge the spillway through the use of shotcrete and deadman/soil anchors as described in the previous section. A breakdown of this cost is provided on the attached Table 1.

The above cost does not include replacing/refurbishing the drawdown valve and its associated mechanisms. The valve is over 30 years old; we recommend that East Goshen Township investigate the condition of the valve and the associated mechanisms, and consider replacement/refurbishment, as required, if the option of restoring the Dam is chosen.

Annualized Operation & Maintenance Cost

An Annualized Operation & Maintenance Cost of $3,300 is estimated for the Dam. This cost includes landscaping (lawn care, etc.) for the Dam embankment, a yearly inspection of the Dam by a Registered Professional Engineer, operation of the drawdown valve by East Goshen Township personnel twice a year, and updating the Emergency Action Plan every five years. A breakdown of this cost is provided on the attached Table 2.

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

Mr. Rick Smith
2009-2484-1B
August 19, 2010
Page 5 of 7

Sediment Removal

At the public meeting, the Board of Supervisors also requested that Advanced GeoServices provide an Opinion of Cost for dredging (removing) the sediment within the reservoir if the Dam is restored. An Opinion of Cost for this activity is provided below.

Mobilization/Demobilization per Event: $15,000(1)
Removal/Disposal of Sediment: $92,000/per ft. of reservoir area(2)

(1) Cost includes erosion and sedimentation control, water management, and site restoration for each removal event. The removal of sediment will be performed in the "dry" by draining the reservoir through the drawdown pipe.

(2) Cost is to remove and dispose one foot of sediment over entire 2.2+/- acre reservoir area (about $26 per cubic yard of sediment). Cost assumes that the sediment can be disposed as clean fill material.

Based on discussions with Richard A. Reisinger, P.E. (Chief of the Delaware Watershed Section of the PADEP Division of Dam Safety), we understand that the PADEP does not have any regulation requiring the removal of sediment that is associated with dam maintenance.

Conventional Gravity Retaining Wall

For comparison purposes, we estimate that the total cost of constructing a conventional cast-in-place gravity retaining wall (i.e., demolishing and rebuilding the Dam, as discussed in the previous section) will be at least $30,000 more than using shotcrete to reconstruct the spillway. Under this option, the cast-in-place concrete can be finished with stained shotcrete to provide a stone-like appearance.

Unlike the shotcrete option, a conventional cast-in-place gravity retaining wall does not have the potential complications associated with damaging/undermining the existing stone/masonry Dam face as discussed at the public meeting. However, the existing Dam face and a portion of the soil embankment will have to be removed making the logistics of this construction more complicated. As a result, the conventional cast-in-place gravity retaining wall option will have a longer and more complicated construction schedule; greater exposure to the risks associated with potential adverse weather and flooding conditions; greater potential to disturb the adjacent stone/masonry walls (particularly on the DeRiemer property); and greater disturbance to the existing soil embankment and downstream floodplain area.

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

Mr. Rick Smith
2009-2484-1B
August 19, 2010
Page 6 of 7

OPINION OF COSTS: (Breaching the Dam)

A range of Opinion of Capital Costs to breach the Dam is listed below. A breakdown of these costs is provided on the attached Table 3. These costs do not include engineering design, permitting, or construction oversight.

Range in Capital Cost: $289,012 - $439,012

The range in the Capital Costs is provided to account for the unknowns associated with the restoration requirements (wetlands, vegetation, trees, rip rap, etc.) of the former reservoir and the ongoing maintenance needed to maintain the planted vegetation until it is adequately established. As stated previously, these requirements will be dependant upon the stability of the remaining sediments and preferences of the adjacent residents, East Goshen Township, and other interested parties that will influence the selection of the future use and aesthetics of the former reservoir area; all of these elements are not known at this time.

Based on discussions with PADEP personnel, we understand that they have no defined requirement for restoration following a dam breach other than that the channel and overbank areas must be vegetated to resist erosion and designed to be hydraulically stable. It is our understanding that on some breach projects the PADEP has hydroseeded the former reservoir area and allowed the area to re-vegetate with the native seeds contained with the remaining sediments.

We understand that it has been reported by others that stream restoration efforts in Pennsylvania have cost as much as $1 million per stream mile to re-establish the natural stream, wetlands, overbank wetlands, and riparian buffers. This criterion was adopted to establish the upper limit for the range of the Opinion of Capital Costs. We believe that this upper limit should be adequate to account for restoration and any required maintenance until the vegetation is adequately established.

Lastly, the range in the Opinion of Capital Costs for breaching the Dam assume that the sediments can be disposed as clean fill material and that the remaining sediments within the former reservoir area will be stable and capable of accommodating grading/earthwork/restoration activities.

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

Mr. Rick Smith
2009-2484-1B
August 19, 2010
Page 7 of 7

We appreciate this opportunity to be of service to you. If you have any questions concerning these matters, please contact us.

Very truly yours,

ADVANCED GEOSERVICES

Todd D. Trotman, P.E., LEED®AP
Project Consultant

Paul F. Marano, P.E.
Senior Project Consultant

PFM:TDT:kk

Enclosures

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

TABLES

OPINION OF COST

F:\OFICEAGC\PROJECTS\Files\2009-2484\Reports\Opinion of Costs Letter.doc

TABLE 1
OPINION OF CAPITAL COSTS
ENLARGING SPILLWAY OF HERSHEY MILL DAM
SHOTCRETE REPAIR OPTION

Work Item Unit Quantity Unit Price or % Source Cost
General
Mobilization/Demobilization Project 1 5.00% AGC Sources $18,156.09
Erosion and Sediment Control Project 1 0.50% AGC Sources $1,815.61
Water Management Project 1 1.00% AGC Sources $3,631.22
Site Restoration Project 1 1.50% AGC Sources $5,446.83
Site Preparation
Construction Entrance at Hershey Mill Road Lump Sum 1 $1,500.00 AGC Sources $1,500
Construction Entrance at Greenhill Road Lump Sum 1 $1,500.00 AGC Sources $1,500
Downstream Rock Filter Each 1 $1,000.00 AGC Sources $1,000
Remove Trees (26" to 36" diameter) Each 6 $520.00 Means 31 13 13.20 3200 $3,120
Remove Trees (14" to 24" diameter) Each 4 $415.00 Means 31 13 13.20 3150 $1,660
Remove Trees (8" to 12" diameter) Each 5 $229.00 Means 31 13 13.20 3050 $1,145
Remove Stumps Each 6 $245.00 Means 31 13 13.20 2150 $1,470
Remove Stumps Each 4 $157.00 Means 31 13 13.20 2100 $628
Remove Stumps Each 5 $42.00 Means 31 13 13.20 2040 $210
Remove Topsoil/Vegetation/Roots from Top of Dam S.Y. 787 $1.53 Means 31 14 13.23 1460 $1,204
Remove/Dispose Sediment/Soft Soils from Inside Face of Dam B.C.Y. 800 $20.00 AGC Sources $16,000
Remove/Dispose Sediment/Soft Soils from Plunge Pool B.C.Y. 67 $20.00 AGC Sources $1,340
Extend Drawdown Pipe through Downstream Work Area L.F. 40 $50.00 AGC Sources $2,000
Remove/Demolish Existing Spillway Slab S.F. 440 $6.85 Means 02 41 16.17 0420 $3,014
Remove/Demolish Existing Spillway Sidewalls C.F. 804 $5.05 Means 02 41 13.33 1400 $4,060
Lower Existing Masonry Wall for New Spillway C.F. 250 $5.05 Means 02 41 13.33 1400 $1,263
Dispose Demolition Debris, Vegetation, Stumps, etc. C.Y. 100 $21.00 Means 02 41 19.18 0500 $2,100
Earthworks
Excavate for New Spillway Slab (Top of Dam) B.C.Y. 152 $16.85 Means 31 23 16.16 6040 $2,561
Excavate for New Spillway Side Walls (Top of Dam) B.C.Y. 63 $16.85 Means 31 23 16.16 6040 $1,062
Excavate for Turn-Down Portion of Spillway Slab (Top of Dam) B.C.Y. 28 $16.85 Means 31 23 16.16 6040 $472
Fill Top of Dam to Elevation 450 B.C.Y. 751 $13.75 Means 31 23 23.15 4000 $10,326
Compaction of Fill on Top of Dam E.C.Y. 751 $0.81 Means 31 23 23.23 5720 $608
Place 18-in Layer of Rip Rap along Upstream Face of Dam C.Y. 285 $67.00 AGC Sources $19,095
Geotextile Fabric Beneath Rip Rap S.Y. 570 $2.43 Means 31 32 19.16 1510 $1,385

Page 1 of 2

TABLE 1
OPINION OF CAPITAL COSTS
ENLARGING SPILLWAY OF HERSHEY MILL DAM
SHOTCRETE REPAIR OPTION

Work Item Unit Quantity Unit Price or % Source Cost
Excavate for New Spillway Foundation and Splash Apron B.C.Y. 120 $25.00 Means 31 23 16.16 6030 $3,000
Six (6) Inches of Topsoil on Eastern Top of Dam S.Y. 350 $6.65 Means 32 91 19.13 0800 $2,328
Turf Reinforcement Mat on Eastern Slope of Dam S.Y. 600 $7.55 Means 31 25 13.10 0060 $4,530
Fill In Front of Plunge Pool B.C.Y. 70 $13.75 Means 31 23 23.15 4000 $963
Compact Fill in Front of Plunge Pool E.C.Y. 70 $0.81 Means 31 23 23.23 5720 $57
Place 18-in Layer of Rip Rap in Front of Plunge Pool C.Y. 23 $67.00 AGC Sources $1,541
New Spillway
Fill Existing Plunge Pool with Lean Concrete/Flowable Fill C.Y. 168 $130.00 Means 03 31 05.70 1950 $21,840
Construct Foundation and Splash Apron for Spillway C.Y. 63 $299.00 Means 03 30 53.40 4050 $18,837
Finish Splash Apron with Stained and Textured Shotcrete S.F. 1100 $21.00 AGC Sources $23,100
Anchors to Deadman Each 15 $2,700.00 AGC Sources $40,500
Anchors to Soil Each 7 $1,685.00 AGC Sources $11,795
Construct Turn-Down Portion of Spillway Slab (Top of Dam) C.Y. 34 $299.00 Means 03 30 53.40 4000 $10,166
Construct Shotcrete Spillway Face C.Y. 53 $1,100.00 AGC Sources $58,300
Finish Spillway Face with Stained and Textured Shotcrete S.F. 1078 $21.00 AGC Sources $22,638
Reinforcement for Shotcrete Spillway Face Tons 5.8 $1,450.00 Means 03 21 10.60 0750 $8,410
Construct Foundation for Spillway Side Walls (Top of Dam) C.Y. 17 $250.00 Means 03 30 53.40 3950 $4,250
Construct Spillway Side Walls (Top of Dam) C.Y. 27 $380.00 Means 03 30 53.40 4260 $10,260
Finish Spillway Sidewalls with Stained and Textured Shotcrete S.F. 606 $21.00 AGC Sources $12,726
Construct Spillway Slab (Top of Dam) C.Y. 71 $299.00 Means 03 30 53.40 4050 $21,229
Aggregate Base Course for Spillway Slab S.Y. 212 $8.75 Means 32 11 23.23 0100 $1,855
Pressure Point DeRiemer Retaining Wall S.F. 135 $45.00 AGC Sources $6,075
Subtotal Items $392,171
Project Overhead and Profit at 10% $39,217
Contingency at 5% $19,609
Opinion of Cost $450,997

Page 2 of 2

TABLE 2
OPINION OF OPERATION & MAINTENANCE COSTS
ENLARGING SPILLWAY OF HERSHEY MILL DAM
SHOTCRETE REPAIR OPTION

Work Item Unit Quantity Per Year Unit Price Annualized Cost
Landscaping (mowing grass) Bi-Weekly 15 $60.00 $900
Inspection by Professional Engineer Once a Year 1 $1,000.00 $1,000
Operation of Drawdown Valve Twice a Year 2 $500.00 $1,000
Updating Emergency Action Plan Every 5 Years 0.2 $2,000.00 $400
Total Annualized Cost $3,300

Page 1 of 1

TABLE 3
OPINION OF CAPITAL COSTS
BREACHING HERSHEY MILL DAM

Work Item Unit Quantity Unit Price or % Source Cost
Mobilization/Demobilization Project 1 2.5% AGC Sources $6,041
Erosion and Sediment Control Project 1 0.5% AGC Sources $1,208
Water Management Project 1 1% AGC Sources $2,416
Construction Entrance at Hershey Mill Road Lump Sum 1 $1,500.00 AGC Sources $1,500
Construction Entrance at Greenhill Road Lump Sum 1 $1,500.00 AGC Sources $1,500
Downstream Rock Filter Each 2 $1,000.00 AGC Sources $2,000
Excavation and Disposal of Sediment C.Y. 6500 $20.00 AGC Sources $130,000
Floodplain Grading Acres 2.21 $8,000.00 AGC Sources $17,680
18-in Layer of Rip Rap at Check Dams C.Y. 134 $67.00 AGC Sources $8,978
Gabion Check Dam Mats S.Y. 292 $63.50 Means 31 36 13.10 0500 $18,542
Gabion Check Dam Walls S.Y. 70 $153.00 Means 31 36 13.10 0800 $10,710
Geotextile Fabric Beneath Rip Rap at Check Dams S.Y. 267 $2.43 Means 31 32 19.16 1510 $649
Turf Reinforcement Mat on Main Channels S.Y. 1650 $7.55 Means 31 25 13.10 0060 $12,458
Turf Reinforcement Mat on Overbank Areas S.Y. 9,046 $1.79 Means 31 25 13.10 0020 $16,192
Remove Trees (26" to 36" diameter) from Dam Each 2 $520.00 Means 31 13 13.20 3200 $1,040
Remove Stumps from Dam Each 2 $245.00 Means 31 13 13.20 2150 $490
Remove/Demolish Existing Spillway Slab S.F. 440 $6.85 Means 02 41 16.17 0420 $3,014
Remove/Demolish Existing Spillway Sidewalls C.F. 804 $5.05 Means 02 41 13.33 1400 $4,060
Remove/Demolish Masonry Wall at Breach C.F. 1350 $5.05 Means 02 41 13.33 1400 $6,818
Hydroseeding M.S.F. 96.3 $62.50 Means 32 92 19.14 4400 $6,019
Subtotal Items $251,315
Project Overhead and Profit at 10% $25,132
Contingency at 5% $12,566
Total Cost $289,012

Stream Restoration: 0.15 miles x $1 million/mile = $150,000.00

Range in Opinion of Cost: $289,012 - $439,012

Page 1 of 2

TABLE 3
OPINION OF CAPITAL COSTS
BREACHING HERSHEY MILL DAM

Notes:

  1. Costs assume that masonry removed from existing dam will be used as rip rap for stream restoration.
  2. Costs assume that the fill excavated from the dam embankment will be used to fill floodplain immediately downstream of dam.
  3. Costs assume that the remaining sediments can accommodate grading, earthworks, and restoration activities.
  4. Costs assume that the sediments can be disposed as clean fill material.

Page 2 of 2

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: August 16, 2010
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Printers

The Township has six common printers. They consist of copiers on the first and second floor and these machines are utilized for making copies, scanning or faxing documents. The Public Works Department has a plotter that is used to make engineering size plans and map; and a smaller printer that will print maps and up to 11" X 17". Finance has a large HP LaserJet used for printing the utility and tax bills; and a dot matrix printer.

We have 20 personal printers and the oldest is about 12 years old. We have begun to standardize them with HP CP 1518 LaserJet. The question is "whether or not is cost effective to have personal printers or have everyone utilize one of the common printers?"

Our analysis indicates that we saving about $31 a month by using personal printers (Diane's 6/3/10 memo). However, this does not include the capital cost of purchasing the personal printer.

The HP CP 1518 costs $275 and has a life expectancy of five years. This works out to $5 a month times 20 printers or $100 a month. Accordingly, our total net cost to use personal printers is $69 a month ($100-$31 savings).

If we divide the $69 a month by 20 employees we arrive at a cost $3.45 per employee per month. Therefore, it costs us $3.45 a month or about $0.17 per working day ($3.45/20 days) for an employee to have a personal printer.

If we assume the average employee makes $50,000 a year he would make $24 an hour or $0.40 a minute.

I would suggest that it would cost us significantly more then $0.17 per day per employee in lost productivity if we eliminated the personal printers and required everyone to use a common printer.

By way of example, an employee would have to put the appropriate letterhead in the common printer then run back to his desk and hit the print key, hoping all the while that another employee did not print a report, memo or spreadsheet in the meantime. He then gets to do it all over again with the envelope.

F:\Data\Shared Data\Admin Dept\OFFICE EQUIPMENT\Memo re Printers 081610.doc

MEMO

TO: Rick Smith, Manager
Joe Gill, Assistant Manager

FROM: Diane Degnan, Office Manager

RE: Additional Information Regarding Cost of Copies/Printers

DATE: June 3, 2010

We currently run an average of 16,000 b/w copies per month at a cost of $.008 each, and 2,400 color copies per month at a cost of $.06 each on the central copier/printer. In addition, the monthly lease payment for the central copier/printer is $378 per month (over five years), adding an additional $.02 onto the cost of each copy.

Therefore, b/w copies on the central printer cost a total of $.028 each, and color copies cost a total of $.08 each. The approximate monthly cost of all copies currently run on the central printer is $640.

This year's paper purchase, which is based on previous years' usage, is 80 boxes (400,000 sheets). If 220,800 of those sheets are run on the central copier/printer, we can assume most of the remaining 179,200 sheets of paper are run on individual printers, and that 87% are b/w and 13% are color copies (as they are on the central copier/printer). Therefore, an average of 13,000 b/w copies and 1,900 color copies are run on individual printers each month.

Individual printers that can not be repaired are being replaced with HP CP1518ni's, the cost of which is approximately $275 under State Contract. If these printers were to last five years, the additional cost would be less than $5 per month per printer. The cost of a black toner cartridge that yields 2,000 copies is approximately $75, and the cost of three color toner cartridges that yield 1,400 copies each (or 4,200) is approximately $70 each (or $210).

Using the HP CP1518ni as a model, b/w copies on an individual printer cost $.03, and color copies cost $.05. The approximate monthly cost of all copies currently run on individual printers is $485, and the approximate monthly cost of copies run on the central printer is $640 - with a combined total of $1,125.

If all copies were to be run on the central printer, the monthly cost would be approximately $1,156.

It should be noted that our current copier/central printer was speced according to the number of copies currently run on that machine and would likely need to be upgraded to a different model if it were going to be used for almost double that amount.

Due to the sensitivity of some of the materials printed, I would suggest that, at the very least, the individual printers of Department Heads continue to be replaced as needed (some have already lasted close to ten years), and if it is decided that the replacement of all others be deferred, that the central copier/printer be upgraded to one appropriate to handle the additional quantity of copies when the lease expires in July of 2014.

Note: The above calculations do not include the cost of paper.

East Goshen Township Printers
Last updated - July 26, 2010
Re Formatted – August 16, 2010

Common Printers

Copiers

  • Savin C5050 Color Copier/Printer/Fax - 1st Floor Copier
  • Savin 2545 Copier/Printer/Fax – 2 nd Floor Copier

Plotters

  • HP 800 Design Jet Plotter - Public Works GIS Area
  • HP 2800 Color Inkjet - Public Works GIS Area

Finance Department

  • HP LJ8150 B&W LaserJet - Outside Finance Area
  • Okidata 3410 Dot Matrix - Outside Finance Area

Personal

Administration

  • HP CP1518 Color LaserJet - Rick Smith
  • HP CP1518 Color LaserJet – Position Vacant
  • HP LJ1200 B&W LaserJet - Diane Degnan
  • HP LJ1200 B&W LaserJet - Joyce Tarsi
  • HP 1200 Color Inkjet - Reception
  • HP 1100 Color Inkjet - Nancy Scheiderman

Public Works Department

  • HP CP1518 Color LaserJet - Public Works PA One Call
  • HP CP1518 Color LaserJet - Chas Linder
  • HP CP1518 Color LaserJet - Mark Miller
  • Epson C84 Color Inkjet - Sue Smith
  • HP 3050 B&W LaserJet Printer/Copy/Fax - Steve Walker

Code Department

  • HP CP1518 Color LaserJet - Mark Gordon
  • HP CP1518 Color LaserJet - Gary Althouse
  • HP LJ1200 B&W LaserJet - Terry Bonnenberger
  • HP 1200 Color Inkjet - Mike Merwin

Finance Department

  • HP LJ3800n Color LaserJet - Deb Beury
  • HP LJ4000 B&W LaserJet - Tia Piccolo
  • HP P2015 B&W LaserJet - Brian McCool
  • HP 4Plus B&W LaserJet - Barbara Phillips

Recreation

  • HP LJ1200 B&W LaserJet - Frank Vattilano 1940

F:\Data\Shared Data\Admin Dept\OFFICE EQUIPMENT\Printers 081610.doc

Wireless Communication Facilities in East Goshen Township

Property Owner Address of Owner Cellular Carrier & Site #
Aqua PA Inc Philadelphia Suburban Water Co 762 W Lancaster Avenue Bryn Mawr, PA 19010 Bob McNulty (610) 525-1900 T-Mobile formerly Omnipoint PSW Edgewood & Hill St 1CH2500B
Aqua PA Inc Philadelphia Suburban Water Co 762 W Lancaster Avenue Bryn Mawr, PA 19010 Bob McNulty (610) 525-1900 Sprint 9 antenna (Sprint/Nextel) PLO3XC204/PA0082
Aqua PA Inc Philadelphia Suburban Water Co 762 W Lancaster Avenue Bryn Mawr, PA 19010 Bob McNulty (610) 525-1900 Nextel 12 antenna (Sprint/Nextel) PLO3XC204/PA0082
Aqua PA Inc Philadelphia Suburban Water Co 762 W Lancaster Avenue Bryn Mawr, PA 19010 Bob McNulty (610) 525-1900 Clearwire Wireless LLC PA - PHL0699
Aqua PA Inc Philadelphia Suburban Water Co 762 W Lancaster Avenue Bryn Mawr, PA 19010 Bob McNulty (610) 525-1900 AT&T West Goshen MDCPA-25253-A FA10115301 Water tank
Aqua PA Inc Philadelphia Suburban Water Co 762 W Lancaster Avenue Bryn Mawr, PA 19010 Bob McNulty (610) 525-1900 Metro PCS HCH6407A
Hicks, Phillip
Hicks, William Ira
William Hicks
671 Airport Road
West Chester, PA 19380
(610) 436-4533
T-Mobile 1CH6407A
formerly Omnipoint
Philadelphia Electric (PECO) PECO
2301 Market Street
Philadelphia, PA 19101
AT&T Goshenville MDCPA-93754-A FA10096962 Wood Pole
United Church of Christ 1201 N Chester Road
West Chester, PA 19380
T-Mobile 1CH6131B
formerly Omnipoint/Voice stream
United Church of Christ 1201 N Chester Road
West Chester, PA 19380
Metro PCS

Township WCF Locations w approx 1 mile radius

Parcel map of East Goshen Township showing Wireless Communications Facility (WCF) locations with approximately 1-mile radius coverage circles (blue circles for East Goshen locations, red circles for WCF locations outside East Goshen) and NextG locations (black triangles) with smaller ~0.25-mile coverage circles.

Map Labels

  • BROWNS
  • AQUA TOWER
  • WGT BLDG

Legend

  • [Triangle] = NEXTG LOCATION
  • [Blue mark] = EAST GOSHEN LOCATIONS
  • [Red mark] = WCF LOCATIONS OUTSIDE EAST GOSHEN
  • [Black line] = NEXTG COVERAGE ~ .25 mi (ASSUMPTION)

Scale: ~ 1 mile (0, 3160, 6320 ft)

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

August 16, 2010

To: Board of Supervisors
From: Mark Miller
RE: Generator Installation

I would like your approval to install a generator for the Public Works Annex. Below is the cost estimate to install the generator.

Building: 6,837.00 (built by Public Works)
Elect. Materials 2,800.00
Labor 5,200.00
Start-up 1,000.00
Underwriter Insp. 200.00
16,037.00
10% cont. 1,637.00
Total 17,674.00

F:\Data\Shared Data\Public Works Dept\Memos to BOS\Memo for generator installation 2010 August 16.doc

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 8/18/2010
To: Board of Supervisors
Cc: Rick Smith, Township Manager
From: Mark Gordon, Township Zoning Officer
Re: Four Poster Feeders

Dear Board Members,

At their meeting on August 16, 2011 the DC discussed the 4 Post Feeder Bait stations and I reported to the Committee that the stations are showing their age and we need new stations to add as rolling stock to our inventory. As you may be aware we had one station destroyed by arson this season and therefore we are down to 9 stations.

I provided the DC with the estimate I got to purchase three new feeders and retire the worst of our current stock. The price to purchase three new units is approximately $1335.00.

We also deploy a digital trail camera to monitor the 4 post feeder stations and move it from location to location to determine the effectiveness of the chosen locations. This camera has been tampered with and is not working correctly. The camera is out of warrantee and three years old. We believe the motion sensor is broken and we are going to try and repair it however a new one is needed. The DC would like to replace the camera. The approximate cost of a new trail cam and accessories, ie. security box, memory card and lock will be $300.

The DC unanimously passed the following motion for your consideration:

Mr. Chairman, I recommend that we request the Board of Supervisors authorize the purchase of three new 4 Post Feeders and a new trail camera for the Deer Tick Program.

F:\Data\Shared Data\ABC'S\Deer Management\2010\Memo to BOS re. Bait Stations 08182010.doc

SENT TO TWP. SOLICITOR ON 8/19/10

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice 610-692-7171
Fax 610-692-8950
E-mail rsmith@eastgoshen.org

Date: August 18, 2010
To: Prospective Bidders
Daily Local News
From: Rick Smith, Township Manager
Re: Refuse Bid

September 14, 2010 - The Board of Supervisors of East Goshen Township, Chester County, Pennsylvania is soliciting bids for the collection of municipal waste and recyclable materials in the Township.

One copy of the proposal form and the other requested documentation must be submitted to the Township Manager, East Goshen Township, 1580 Paoli Pike, West Chester, PA 19380, by no later than 10:00 A.M. on September 24, 2010 at which time the bids will be opened and read aloud.

All bids must be accompanied by a bid bond or certified check, in the amount of $20,000.00. A bidder may not withdraw his bid for a period of ninety (90) days after the bid opening. Bid specifications and proposal forms may be obtained from East Goshen Township, 1580 Paoli Pike, West Chester, PA, 19380. Questions regarding this bid should be directed to the undersigned at (610) 692-7171.

The Board of Supervisors of East Goshen Township reserves the right to waive technicalities, to reject any or all bids or items herein and to make the award that is in the best interests of the Township.

Louis F. Smith, Jr.
Township Manager

Please publish September ____, 2010 and September ____, 2010
Please send proof of publication and invoice to:
Louis F. Smith, Jr., Township Manager,
East Goshen Township
1580 Paoli Pike

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

1

West Chester, PA 19380

EAST GOSHEN TOWNSHIP
MUNICIPAL WASTE AND RECYCLABLE MATERIALS COLLECTION CONTRACT

INSTRUCTIONS TO BIDDERS

1. SCOPE OF WORK: The work to be performed shall consist of the collection of all "municipal waste" as defined by the Solid Waste Management Act, Act of July 7, 1980, P.L. 380, No. 97, 35 P.S. 6018.101 et seq. (hereinafter referred to as "Act 97"), yard waste and leaf waste from residences within the boundary of the Township of East Goshen Township, Chester County, Pennsylvania (hereinafter referred to as "Township"). The waste shall then be transported to the Lanchester Landfill for disposal. The Township will pay the tipping fee at the landfill. It is also the intent of the Township under this contract to continue an existing program of the collection of recyclable materials in accordance with the provisions of Section 304(c) of the Municipal Waste Planning, Recycling and Waste Reduction Act, Act of July 28, 1988, P.L. 556, No. 101, 53 P.S. 4000.304(c) (as amended) (hereinafter referred to as "Act 101").

2. DEFINITIONS:

Bulk Trash Items: Includes, but is not limited to, such items as hot water heaters, stoves, refrigerators, freezers, dishwashers, air conditioners, sofas, mattresses, box springs, tables, chairs and other items from residences having at least one dimension of 24 inches (24”) or more. All such items shall be able to be lifted by two people.

The Contractor shall not be required to collect or transport any item that contains or once contained Freon unless a certificate accompanies the item that attests that the Freon was removed and recycled in accordance with applicable state and/or federal laws.

Building Materials: Includes such materials as drywall, lumber, cabinets, doors, shingles, block, brick, pieces of concrete or other debris that would typically result from a remodeling project or the construction of an addition, deck, garage or shed.

Contractor: The person, partnership, company, firm or corporation that is awarded the contract for collection of municipal waste, yard waste, leaf waste, etc. in East Goshen Township.

Leaf Waste: Includes leaves from both deciduous and coniferous trees.

Municipal Waste: Any garbage, refuse, industrial lunchroom or office waste and other material, including solid, liquid, semi-solid or contained gaseous material, resulting from operation of residential, municipal, commercial or institutional establishments, and from community activities, and any sludge not meeting the definition of residual or hazardous waste in Act 97 from a municipal, commercial or institutional water supply treatment plant, wastewater treatment plant or air pollution control facility. The term includes small appliances whose longest dimension is less then 24 inches (24”). The Contractor shall not be required to collect or

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

2

transport any item that contains or once contained Freon unless a certificate accompanies the item that attests that the Freon was removed and recycled in accordance with applicable state and/or federal laws. The term does not include source-separated recyclable materials, building materials, yard waste, leaf waste, Christmas trees, automotive parts or tires.

Ordinance: The East Goshen Township Municipal Waste Collection and Residential Recycling Ordinance, Ordinance No. 91 of 1990 as amended, codified in Chapter 194 in the Code of the Township of East Goshen.

Township: East Goshen Township, Chester County, a Township of the Second Class located within the Commonwealth of Pennsylvania.

Single-Family Detached Dwelling Unit: A single-family structure on its own lot that has a yard on four sides or a semi-detached family structure that has a yard on three sides. A semi-detached single-family dwelling unit is commonly known as a twin or double. The term also includes the 15 townhouses in Dutts Mill.

Yard Waste: Includes weeds, brush, grass clippings, sticks, twigs, branches, and other material that is typically generated from the yard and garden of a single-family dwelling unit. The term does not include leaf waste.

3. EXAMINATION OF TOWNSHIP: Bidders shall inspect the Township so that they can make their own judgment concerning all circumstances affecting the cost of service in question and the nature of the work to be performed. Bidders shall assume all risks, whether or not patent, latent, known, hidden, or foreseeable.

4. SPECIFICATIONS AND DOCUMENTS: Bidders are advised to examine carefully the specifications and all documents describing the proposed work and to make their own independent judgment with respect to the circumstances affecting the cost of work and the performance required by said documentation.

5. SUMMARY OF THE COLLECTION OPTIONS:

A. Single-Family Detached Dwelling Units -- Curbside Collection

a. Option 1 – Unlimited Municipal Waste With Twice a Week Collection - Under this option, each resident may place an unlimited amount of municipal waste at the curb on each of two collection days per week. Yard waste, leaf waste and/or Christmas trees will be collected four times during the month of November, and twice a month in all other months of the year. Bulk trash items shall be collected once a month. Recyclables shall be collected once a week. There are no limits on the amount of yard waste or leaf waste or on the number of bulk items or Christmas trees that a resident can place out for collection,

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

3

b. Option 2 – Unlimited Municipal Waste With Once a Week Collection - Under this option, each resident may place an unlimited amount of municipal waste at the curb on one collection day per week. Yard waste, leaf waste and/or Christmas trees will be collected four times during the month of November, and twice month in all other months of the year. Bulk trash items shall be collected once a month. Recyclables shall be collected once a week. There are no limits on the amount of yard waste or leaf waste or on the number of bulk items or Christmas trees that a resident can place out for collection,

6. ZONES: Not applicable

7. DWELLING UNITS: The Contractor will be required to submit its bid based upon the single-family dwelling unit quantities on the Proposal Form. Payment will be based upon the actual number of single family dwelling units from which municipal waste and recyclable materials are collected.

The Contractor understands that during the term of the contract, the Contractor may be required to increase or decrease the number of dwelling units that are serviced at the same monthly cost per unit as submitted by the Contractor on the Proposal Form.

7. SCOPE AND AREA OF COLLECTION DISPOSAL: The award of the contract will require the successful bidder to supply all of the labor and equipment required to collect, haul and deliver all municipal waste, yard waste, leaf waste, bulk trash items, Christmas trees, and recyclable materials as required by the specifications.

THE SUCCESSFUL BIDDER SHALL BE REQUIRED TO COMMENCE COLLECTION SERVICES ON JANUARY 1, 2011.

The successful bidder shall be able to process and market the recyclable materials in the event the County Marketing and Disposal Facility is not operational, as provided in Section 9.C. hereof.

The successful bidder shall be required to comply with the Ordinance, all applicable laws and statutes of the Commonwealth of Pennsylvania, including but not limited to Act 97 and Act 101 and all applicable regulations promulgated there under, of the County of Chester and of the United States Government and/or their agencies with respect to Worker's Compensation and the hauling and disposal of all materials collected.

THE RULES AND REGULATIONS PERTAINING TO THE COLLECTION AND DISPOSAL OF MUNICIPAL WASTE AND SOURCE-SEPARATED RECYCLABLE MATERIALS ISSUED BY TOWNSHIP, COUNTY, STATE OR FEDERAL AGENCIES SHALL BE CONSIDERED TO BE AN INTEGRAL PART OF THESE REGULATIONS AND SHALL BE BINDING ON THE

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

4

CONTRACTOR.

8. TOWNSHIP RESPONSIBILITIES:

A. Preparation of municipal waste, yard waste, leaf waste, bulk trash items and Christmas trees for collection:

Municipal waste shall be placed in trashcan(s) or trash bag(s) and placed at curbside on the designated collection days. Trashcans shall not exceed fifty (50) pounds in weight. Lightweight materials shall be properly tied into bundles or packaged in a manner designed to prevent any scattering while the Contractor is handling the same or while such materials await collection. Bundles shall be of a size and construction to permit of handling by one man and shall in not exceed fifty (50) pounds in weight.

Yard waste shall be placed in a trashcan(s), which will be emptied by the Contractor or biodegradable paper bags that will be taken with the yard waste, and placed at the curbside on the designated collection days. If yard waste is too bulky to be placed in a trashcan, it shall be cut up and tied into bundles. The bundle(s) shall be of such size that the longest dimension thereof shall not exceed three (3') feet and the total weight of each bundle shall not exceed fifty (50) pounds. Yard waste shall not be placed in plastic bags.

Leaf waste shall be placed in biodegradable paper bags that will be taken with the leaves; or in a trash can or similar container that will be emptied by the Contractor and placed at the curbside on the designated collection days. Leaf waste shall not be placed in plastic bags.

Bulk trash items must be able to be lifted by two people and placed at the curbside on the designated collection days.

Christmas trees shall be and placed at the curbside on the designated collection days. Christmas trees in plastic bags will not be collected.

Building materials, construction debris, full or partially full paint cans, used motor oil, batteries, automotive parts and tires will not be collected.

B. Designation and Preparation of Recyclable Materials: The following recyclable materials shall be included in the recycling collection.

Single Stream - aluminum beverage cans, bi-metal &, steel cans; clear, brown, & green glass food and beverage containers; and PET & HDPE plastic containers: and newspapers, and/or cardboard will be placed into one or more containers by the residents. These materials will be separated later at the designated County Marketing and Processing Facility.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

5

The Township will inform the residents of the preparation procedures for the designated recyclable materials. The procedures are:

  1. 1) The recycling containers used shall be those supplied by the Township and marked with the recycling logo or similar containers purchased by the resident.
  2. 2) Newspapers (including the newspaper inserts) and/or cardboard, copy paper, junk mail, office paper, catalogues shall be placed in the recycling container and placed at curbside on the designated recycling day.
  3. 3) Aluminum, bi-metal, and steel cans shall be rinsed, placed in the recycling container, and placed at curbside on the designated recycling day.
  4. 4) Clear, green, and brown glass food and beverage containers shall be rinsed, with caps, lids and metal rings discarded, placed in the recycling container, and placed at curbside on the designated recycling day.
  5. 4) PET and HDPE containers shall be rinsed, with caps, lids and metal rings discarded, placed in the recycling container, and placed at curbside on the designated recycling day.

NOTE: The Township reserves the right to change the designated recyclable materials.

C. Violation Notices: The Township will supply the Contractor with violation notices.

D. Disposition of Recyclable Materials: The Township will not provide storage for the recyclable materials.

E. Program Monitoring and Receipt of Citizen Complaints: The Township shall monitor the Contractor's performance and shall take citizen complaints. The Township will notify Contractor of these complaints.

9. CONTRACTOR'S SCOPE OF WORK AND OBLIGATIONS:

A. Municipal Waste, Scope of Work: The Contractor shall provide all labor and equipment necessary to collect municipal waste from all of the single family detached dwellings in the Township in accordance with these specifications.

The Contractor's employees shall handle all municipal waste containers with reasonable care to avoid damage and shall place the empty container back in its original location after emptying. Each collection crew shall have a broom and shovel and they shall promptly clean up any materials spilled during collection.

Building materials, automotive parts and tires will not be collected as municipal waste.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

6

The Contractor shall collect all municipal waste and transport the same to the Lanchester Sanitary Landfill.

The Township will pay all tipping fees imposed by the Chester County Solid Waste Authority for disposal of said waste at the landfill.

B. Recyclable Materials, Scope of Work: The Contractor shall provide all labor and equipment necessary to collect recyclable materials from all of the single-family detached dwellings in the Township in accordance with these specifications.

The Contractor shall not contaminate the collected recyclable materials with non-recyclable materials.

The Contractor's employees shall handle all recycling containers with reasonable care to avoid damage and shall place the empty recycling container in its original location after emptying. Each collection crew shall have a broom and shovel and they shall promptly clean up any materials spilled during collection.

The Contractor shall be required to collect all properly prepared recyclable materials, but shall not be required to collect improperly prepared recyclable materials.

The Contractor shall tag recycling containers that do not contain properly prepared recyclable materials or contain municipal waste with a violation notice supplied by the Township.

The Contractor shall abide by all traffic regulations and will comply with all applicable Federal, State, County and Township regulations.

The Contractor will be responsible for the delivery of the collected recyclable materials to the designated County Marketing and Processing Facility.

C. Processing and Marketing of Recyclable Materials: The Township has entered into an agreement with Chester County to utilize the County Processing and Marketing Facility for receipt of recyclable materials. Browning-Ferris, Inc (BFI) currently has the contract with the County and their facility is located at 372 S. Henderson Road in King of Prussia, PA.

In the event the County's contract with BFI is not renewed, but the County enters into an agreement with another firm to process and market the recyclable materials, the Contractor shall deliver the materials to that firm's facility.

In the event the Township's agreement with the County is not renewed, the Contractor shall assume ownership of the recyclable materials at curbside, and be responsible for the

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

7

processing and marketing of the recyclable materials. The price per ton paid to the Township or negative charge per ton paid by the Township to process and market the recyclable materials shall be in accordance with the prices quoted in “Recycling Times” or some other trade journal. It is expected that the prices for these recyclable materials may fluctuate during the term of this contract.

NOTE: The Township at its sole discretion may elect to process and market one or more of the recyclable materials on its own, at any time during the term of this Agreement. If the Township elects to implement this option, a separate contract will be negotiated to haul the recyclable materials to an as yet undetermined location.

The Township will pay all fees imposed by BFI for disposal of said recyclables.

D. Bulk Trash Items, Scope of Work: The Contractor shall collect and transport to the Lanchester Landfill bulk trash items, which includes, but is not limited to, such items as hot water heaters, stoves, refrigerators, freezers, dishwashers, air conditioners, sofas, mattresses, box springs, chairs and other bulk trash items from residences. All such items shall be able to be lifted by two people.

The Contractor shall not be required to collect or transport any item that contains or once contained Freon unless a certificate accompanies the item that attests that the Freon was removed and recycled in accordance with applicable state and/or federal laws.

Building materials, full or partially full paint cans, used motor oil, batteries, automotive parts and tires will not be collected as bulk trash.

The Contractor shall collect all bulk trash items and transport the same to the Lanchester Sanitary Landfill.

The Township will pay all tipping fees imposed by the Chester County Solid Waste Authority for disposal of said waste at the landfill.

E. Yard Waste, Scope of Work: The Contractor shall provide all labor and equipment necessary to collect yard waste from all of the single-family detached dwellings in the Township in accordance with these specifications.

All yard waste shall be placed in a biodegradable paper bag that will be taken with the yard waste or in a trashcan or similar container that will be emptied by the Contractor. Yard waste shall not be placed in plastic bags. When applicable, yard waste shall be securely tied into a bundle, and shall be of such size that the longest dimension thereof shall not exceed three (3') feet and the total weight thereof shall not exceed fifty (50) pounds.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

8

The Contractor shall collect all yard waste and transport the same to the Lanchester Sanitary Landfill.

The Contractor's employees shall handle all trashcans or containers with reasonable care to avoid damage and shall replace the container in its original location after emptying.

Each collection crew shall have a broom and shovel and they shall promptly clean up any materials spilled during collection.

The Township will pay all fees imposed by the Chester County Solid Waste Authority for disposal of said waste at the landfill.

F. Leaf Waste and Christmas trees, Scope of Work: The Contractor shall provide all labor and equipment necessary to collect Leaf Waste and Christmas trees from all of the single-family detached dwellings in accordance with these specifications.

Leaf waste shall be placed in a biodegradable paper bags that will be taken with the leaves, or placed in a trashcan or similar container that will be emptied by the Contractor's employees. Leaf waste shall not be placed in plastic bags.

Christmas trees shall be placed at the curbside for collection. Christmas trees shall not be in plastic bags.

The Township will pay all tipping fees imposed by the Chester County Solid Waste Authority for disposal of the leaf waste and Christmas trees at the landfill.

The Contractor's employees shall handle all trashcans or containers with reasonable care to avoid damage and shall place them in their original location after emptying. Each collection crew shall have a broom and shovel and promptly clean up any materials spilled during collection.

G. Collection Schedule: Collections shall be made between the hours of 6:00 A.M. and 5:00 P.M., Monday through Friday in accordance with the following schedule:

  1. 1. Option 1 (Twice a week collection) - If the Contractor intends to divide the Township into one or more “zones” the Contractor shall provide the Township with a plan showing how it intends to divide the Township by November 1, 2010.

In order to minimize the inconvenience to any one group of Township residents the Township reserves the right to “switch” the collection days for each zone annually.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

9

The Contractor shall follow the schedule of holidays that is approved by the Chester County Solid Waste Authority. The Contractor is not required to collect municipal waste, yard waste, leaf waste, Christmas trees, bulk trash items or recyclable materials on those days the Lanchester Landfill is closed.

Under Option 1 if a collection day is lost due to a holiday on which the Lanchester Landfill is closed, the Contractor is not required to make up the collection.

The Township shall review and approve the schedule for the collection of municipal waste, recyclables, yard waste, leaf waste, Christmas trees and bulk trash items.

  1. 2. Option 2 (Once a week collection) - Collections shall be scheduled for Tuesday, Wednesday or Thursday.

If the Contractor intends to divide the Township into “zones”, the Contractor shall provide the Township with a plan showing how it intends to divide the Township by November 1, 2010.

The Contractor shall follow the schedule of holidays that is approved by the Chester County Solid Waste Authority. The Contractor is not required to collect municipal waste, yard waste, leaf waste, Christmas trees, bulk trash items or recyclable materials on those days the Lanchester Landfill is closed.

Under Option 2 if a collection day is lost due to a holiday the Contractor is required to make up the collection day during that week.

The Contractor shall provide the Township with a schedule to make up those lost collection days for 2011by November 1, 2010 and November 1 of succeeding years.

The Township shall review and approve the schedule for the collection of municipal waste, recyclables, yard waste, leaf waste, Christmas trees and bulk trash items.

Collection shall be made regardless of weather conditions, unless authorization to cancel collection is received from the Township. If the Contractor is authorized to cancel collections any collections not made that day shall be made the next day.

H. Dutts Mill Credit: The Dutts Mill is a community of 3 single-family detached homes and 15 townhouses located in the Township. Dutts Mill has elected to participate in the Township Refuse and Recycling Program. Their grounds are maintained by a professional lawn service company and the individual residents do not utilize the Township's Yard

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

10

Waste or Leaf Waste services. The Contractor shall indicate the amount of the credit each of the dwelling units would be entitled to in its bid for Options 1 & 2.

I. Record keeping: The Contractor shall provide the Township with the following information on a monthly basis.

  1. 1. Number of single-family detached dwelling units serviced.
  2. 2. Any additional information required by Pennsylvania Department of Environmental Resources or the Chester County Solid Waste Authority.

J. Disposition of Waste: All municipal waste, yard waste, leaf waste, Christmas trees and bulk trash items contracted to be collected herein shall be delivered to the Chester County Solid Waste Authority Lanchester Landfill. The Township shall pay the tipping fee.

K. New Stops: The Township will notify the Contractor of new stops on a weekly basis. The Contractor shall begin collection services on the next regularly scheduled collection day.

L. State Roads: In order to minimize delays for motorists the Contractor shall to the maximum extent possible set up the collection routes so that refuse and recyclables on not collected during peak traffic hours (7:00 am to 8:30 am and 4:30 pm to 5:30 pm) for homes on North Chester Road, Boot Road and Paoli Pike.

10. VIOLATIONS, REJECTED LOADS, AND TERMINATION OF CONTRACT

A. Violations: It is understood that the orderly and proper collection of municipal waste, yard waste, recyclable materials, etc. as defined herein, is a matter of serious and vital concern to the Township because of the effect which it has upon the health and welfare of the residents. Furthermore, it is anticipated that occasional minor breaches or violations may occur during the course of the performance of the contract. Since the cost of these minor breaches or violations are incapable of prompt and reasonable calculation, the Township Manager, may invoke the following stipulated liquidated damages on behalf of the Township. This determination and certification of the same shall be final.

The Township Manager or his designee shall notify the Contractor of such violations and they shall be promptly corrected. If the violation is not corrected within a reasonable amount of time, as determined by the Township Manager, the Township Manager may assess a fine in accordance with the following schedule of liquidated damages:

  1. 1. The collection of municipal waste from non-East Goshen Township dwelling unit or business establishment and hauling same to the landfill - $500.00 per offense

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

11

  1. 2. Failure to collect refuse or recyclables - $25.00 per occurrence.
  2. 3. Failure to replace the trashcan(s) or recycling container(s) in original location- $25.00 per occurrence. The Township is aware that wind and large trucks can move refuse and recycling containers after they have been emptied, and allowances will be made for windy days and for properties located on major roads.
  3. 4. Using or maintaining trucks in a leaking or unsanitary condition - $300.00 per offense.
  4. 5. Damaging or carrying away a resident’s municipal waste or recycling container(s) – replacement cost of the container.
  5. 6. Failure to clean up any materials spilled or draining from equipment - $300.00 per offense.
  6. 7. Failure to have a supervisor in the Township as required in Section 12 - $300.00 per offense.

Any damages assessed for any of the aforesaid violations shall be deducted from the next payment due to the Contractor.

B. Loads Rejected by the Recycling Center: The Contractor is responsible for collection of only properly prepared recyclable materials and to maintain each load of recyclable materials in an uncontaminated condition. If any load of recyclable materials is rejected at the recycling center because of contamination the Contractor will pay the Township the revenues that the Township would have received if the load had not been contaminated.

C. Contractor Default and Notice: The following events shall constitute an event of default (“Event of Default”):

  1. 1. The failure of the Contractor to collect the materials required herein for a period of five (5) consecutive days; or
  2. 2. Five or more violations by the Contractor as set forth in Section 10.A within a one (1) week period for two (2) consecutive calendar weeks.

The Township shall not proceed against the Contractor under Section 10.D unless notice describing the Event of Default has been provided to Contractor. The Contractor shall be given a 24 hour period to cure such Event of Default before the Township exercises one of the remedies provided in Section 10.D.

D. Township’s Remedies Upon Event of Default: In the Event of Default, the Township may exercise any one or more of the following remedies:

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

12

  1. 1. Terminate the Contract by providing written notice to Contractor; and/or
  2. 2. Notifying the Contractor’s surety and collecting on the performance bond that Contractor has posted with the Township; and/or
  3. 3. Notifying the Contractor’s surety and collecting the penal amount of the bond; and/or
  4. 4. File an action in law against the Contractor seeking the payment of all damages sustained by the Township as a result of Contractor’s default; and/or
  5. 5. File an action in equity against Contractor seeking specific performance of the Contractors obligations under this Contract.

The Township shall, in addition, have such other legal remedies for the collection of such obligations as are now, or may hereafter be provided by law. All remedies of the Township shall be cumulative and not exclusive and are enforceable in the Township’s discretion alternatively, successively, or concurrently on any one or more occasions and in any order the Township may determine.

E. Force majeure: It is hereby stipulated and agreed that in the event of a labor stoppage; labor strike, lockout; destruction of or damage to the Contractor's equipment caused by Acts of God; fires; explosions or other matters beyond the reasonable control of the Contractor; restraints of government; lawful orders of the court, administrative agencies or governmental officers; suspension, termination or interruption of governmental licenses or permits; changes in laws, regulations, or ordinances; the Contractor shall not be considered in default or breach of the Contract by reasons thereof, provided, however, that the Township's cost of performing the work specified in the Contract during such period shall be charged to and reimbursed by the Contractor as in the case of default by the Contractor.

11. BIDDERS' QUALIFICATIONS AND EXPERIENCE: Bidders submitting proposals must have previous experience in the collection of recyclable materials, municipal solid waste, or other similar material. Bidders shall submit the following with their bid:

Locations in Pennsylvania where the bidder is under contract to collect municipal solid waste and/or recyclables with references for listed locations. References to include the location and the name address and telephone number of the contact person.

12. SUPERVISION: The Contractor shall have a supervisor with pick-up truck in the Township during any day that municipal waste, recyclables, yard waste, leaf waste, Christmas trees and bulk trash items are to be collected. The supervisor shall have a cell phone so that he can be in direct contact with the Township in order to remedy any missed collections, or any other problems that occur during the course of collections. The supervisor shall arrive at the Township no later then noon and shall not leave the Township until 5:30 PM or the completion of collections, whichever is later.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

13

The Contractor shall further be held responsible for the conduct and deportment of the Contractor's employees during the performance of their work. Said employees shall not use loud, abusive, profane or lewd language in their dealings with the public, nor shall they use loud, abusive, profane or lewd language amongst themselves during the performance of their work. Further, said employees shall conduct their work as quietly as possible with a minimum of interference to pedestrian and vehicular passageway through the Township.

13. TERM: The term of the contract shall be three (3) years.

14. ASSIGNMENT: It is understood and agreed by the Contractor that, during the performance of its duties under this contract, it will not assign its contractual rights or its duties and obligations arising hereunder, to any third person without the prior written approval of the Township being first had and obtained, which approval the Township shall be under no obligation to give, it being at all times understood that the Contractor is not acting as an agent or a subsidiary of any other entity.

15. MERGER/BANKRUPTCY/BULK SALE: During the term of the contract, Contractor covenants, warrants and agrees that it will not file any proceeding in bankruptcy or reorganization under the bankruptcy laws of the United States or under any specific debtor, receivership, composition for creditors, liquidation proceedings or similar proceedings under Pennsylvania law.

Contractor further covenants, warrants, and agrees that, during the term of any contract awarded, that it will not merge with any other entity or become a subsidiary of any other person, corporation, or any other entity. Contractor also warrants that it will not undertake the sale of its assets, stock, or equipment during the term of the contract in any fashion, which might jeopardize or compromise service or performance.

If, despite the covenant contained herein, said Contractor does file proceedings in bankruptcy or like proceedings in State courts, or by merger or sale becomes acquired by any other corporation or entity, such actions shall constitute a termination of the contract and a forfeiture of the Performance Bond, at the Township's sole election.

16. INSPECTION: The Township or any authorized representative thereof may inspect the collection process employed by the successful Contractor under the contract and may require the correction of any improper or deficient performance of the contract through the designated supervisor of the Contractor. The Township specifically reserves the right to inspect any truck used in the collection of refuse and recyclables at any time in order to ensure that the terms of this contract are being adhered to.

17. WORKMEN'S COMPENSATION INSURANCE: The Contractor during the term of this contract shall carry workmen's compensation insurance, insuring and covering any and all persons employed by him in the performance of this contract, and before starting work on the

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 14

contract, shall annually file a certificate from the insurance company certifying the issuance of such company's insurance policy and the payment of the premium thereof with the Township. An affidavit accepting the provisions of the Pennsylvania Workmen's Compensation Act of 1915 shall be submitted with the bid.

18. LIABILITY INSURANCE: The Contractor shall maintain, during the term of this contract at its sole expense, the following minimum liability insurance coverage:

A. General public liability insurance (non-automotive) for bodily injury and property damage in the amount of $500,000.00 per occurrence but with the aggregate limit of $1,000,000.00.

B. Automotive liability insurance for bodily injury and property damage in the amount of $500,000.00.

C. Umbrella excess liability insurance coverage in the amount of $10,000,000.00.

The aforesaid policies of insurance and others that may be necessary to comply herewith shall be maintained in the amount set forth above and shall, inter alia, NAME THE TOWNSHIP AS AN ADDITIONAL NAMED INSURED and be designed to protect the Township from any and all claims for damage of any kind or any nature whatsoever, including but not limited to wrongful death, which may arise from the obligation of the Contractor in the performance of this contract, whether such obligation be controlled by the Contractor himself or by someone either directly or indirectly employed by him for the purpose of accomplishing some obligation incumbent upon the Contractor by the terms of this contract and shall otherwise indemnify and hold the Township harmless from any and all manner of claims, lawsuits, judgment, damages and executions and shall provide, at the insurer's expense, all necessary legal aid, counsel and representation.

All insurance policies maintained hereunder shall be issued by an insurance carrier licensed and authorized to do business within the Commonwealth of Pennsylvania and shall be obtained and properly endorsed in favor of the Township before the execution of the contract hereunder. Said policy shall remain in full force and effect until the expiration of the term of this contract or any extensions or until completion of all duties to be performed hereunder by the Contractor, whichever shall occur later. The Contractor shall deposit with the Township the original policies and insurance herein referred to or true copies thereof, prior to commencing work under this contract.

Evidence of said insurance shall be submitted to the Township within fourteen (14) days after notification of the award of contract.

D. Cancellation of Insurance: Each and every policy of insurance maintained in accordance with the terms of these specifications or the contracts entered hereunder, shall carry with it an endorsement to the effect that the insurance carrier will convey to the

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 15

Township, by certified mail, return receipt requested, written notice of any modification, alterations or cancellations of any policy or policies or the terms thereof; and said written notice must be received by the Township, at least ten (10) days prior to the effective date of any such modification, alteration or cancellation. If such modifications, alterations or cancellations shall cause the insurance coverage required hereunder to fail to meet the minimum requirement set forth herein, the Contractor shall be deemed to be in default and the Township shall terminate this agreement as of the effective date of said change in insurance coverage and the surety on the performance bond shall be held responsible by the Township for any loss arising as a result there of.

It shall be the responsibility of the Contractor in obtaining the aforesaid insurance coverage to obtain policies which shall protect the Township from any and all claims whatsoever in nature regardless of the source of said claim and regardless of whether the same are directed toward the recovery of damages for personal injury, property damage or any other claim of damage which may be incident to the same.

E. GOVERNMENTAL IMMUNITY WAIVER: All policies of insurance required pursuant to these specifications or the contract(s) entered into therein under, shall waive any governmental immunity, if any, of the Township and shall extend to and include all direct and indirect agents and employees of the Contractors and shall include policies of liability insurance on all vehicles and equipment utilized or in any way connected with the service to be rendered by the Contractor pursuant to the terms of this contract.

19. HOLD HARMLESS PROVISION: The Contractor will indemnify and save harmless the Township and all its officers, agents and employees from any actions, liabilities or claims resulting from the performance of the contract.

20. BONDS:

A. Bid Bond: A bid bond or a certified check in the amount of $20,000 shall be submitted with each proposal. Bid bonds shall be on the form provided and shall be duly executed by the bidder as principal and the surety company. The surety company must be authorized to do business in the Commonwealth of Pennsylvania and the Bid Bond must be accompanied by a Power of Attorney nominating, constituting and appointing the person whose signature appears on said bid bond as the true and lawful agent of the surety to execute all bonds and the consent on its behalf.

Any certified check that is received by the Township in lieu of a Bid Bond will be returned upon execution of the agreement.

In the event any bidder shall, upon award of the contract to him, fail to execute the agreement or comply with the requirements of these specifications, the full amount of the Bid Bond or certified check shall be forfeited to the Township as liquidated damages (not a penalty).

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 16

A Consent of Surety shall be submitted by which the Surety acknowledges that the bidder, if successful, will be able to provide the Township with a performance bond for 100% of the amount of the contract award for the option selected by the Township, which shall be calculated in accordance with Section 23 Bid Award hereof. The Consent of Surety shall be on the form provided and submitted with each proposal.

B. Performance Bond The successful bidder will be required to obtain and post a performance bond in the amount of 100% of the amount of the contract award for the option selected by the Township, which shall be calculated in accordance with Section 23 Bid Award hereof. The performance bond shall be submitted within fourteen (14) days after notification of the award of the contract. The performance bond shall be in a form acceptable to the Township Solicitor.

21. SCHEDULE OF PAYMENTS: The Township shall pay the Contractor monthly, for the collection of municipal waste, yard waste, leaf waste, Christmas trees, bulk trash items and recyclable materials completed in accordance with these specifications.

The Contractor shall be paid based on the number of dwelling units serviced during the month.

22. BID OPTIONS: Bids are being solicited for two options.

Option 1 - Unlimited Municipal Waste with Twice a Week Collection

Single-Family Dwelling Units

  1. Curbside collection of municipal waste twice a week. The amount of municipal waste is unlimited.
  2. Curbside collection of recyclable materials once a week. The amount of recyclables is unlimited
  3. Curbside collection of leaf waste, yard waste and/or Christmas trees four (4) times during the month of November and two times a month in all other months of the year. The amount of leaf waste, yard waste and/or Christmas trees is unlimited.
  4. Curbside collection of bulk trash items once a month. There is no limit on the number of bulk items.

Option 2 - Unlimited Municipal Waste with Once a Week Collection

Single-Family Dwelling Units

  1. Curbside collection of municipal waste twice a week. The amount of municipal waste is unlimited.
  2. Curbside collection of recyclable materials once a week. The amount of recyclables is unlimited
  3. Curbside collection of leaf waste, yard waste and/or Christmas trees four (4)

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 17

times during the month of November and two times a month in all other months of the year. The amount of leaf waste, yard waste and/or Christmas trees is unlimited.
4. Curbside collection of bulk trash items once a month. There is no limit on the number of bulk items.

23. BID AWARDS: The Township will determine the low bidder by calculating the total cost for three (3) years as depicted on the schedule of prices.

If the total cost on any proposal is found to be computed incorrectly, the Township reserves the right to make such changes as are necessary in the extended amounts and total cost on the basis of the unit prices given and the quantities stated for the scheduled items therein.

The Board of Supervisors of East Goshen Township reserves the right to waive technicalities, to reject any or all bids or items herein and to make the award that is in the best interests of the Township.

23. ADDENDA: Any revision or interpretation of the bid specifications prior to the bid opening will be made in the form of an Addendum to the specifications and a copy of the Addendum will be faxed or emailed to each person receiving a set of bid specifications. The Township will not be responsible for any other explanations or interpretations of the bid specifications or any part thereof.

24. SEPARATE CONTRACTS: Not applicable.

25. Drug and Alcohol Testing Program: The Omnibus Transportation Employee Testing Act of 1991 requires drug and alcohol testing for safety-sensitive employees the aviation, motor carrier and mass transit industries, and required the U.S. Department of Transportation to promulgate rules mandating and regulating anti-drug and alcohol misuse prevention programs. Each proposal shall be accompanied by an affidavit acknowledging that the bidder is in compliance with the Act.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 18

EAST GOSHEN TOWNSHIP PROPOSAL FORM

(please print or type):

Date __________________________________________________

Firm Name __________________________________________________

Address __________________________________________________
__________________________________________________

Contact Person __________________________________________________

Telephone __________________________________________________

Fax __________________________________________________

E-Mail __________________________________________________

This proposal is submitted in accordance with the advertisement inviting bids to be received by East Goshen Township at the Township Building, 1580 Paoli Pike, West Chester, PA, 19380, until 10:00 A.M. on September 24, 2010 for the collection of municipal waste and recyclable materials.

After examining all parts of this project for supplying of collection services for recyclable materials and municipal waste, we have read and understand the specifications as set forth in the Instructions to Bidders, and hereby propose to furnish said services in strict accordance with all specifications for the sums indicated, and the undersigned herein agrees to furnish all labor, materials and equipment and to perform all work necessary to complete in a workmanlike manner, the work described in the above-mentioned contract, in accordance with said contract documents to the satisfaction and acceptance of the Township, for the sum as stated below and on the Proposal Breakdown:

OPTION 1 TOTAL THREE-YEAR COST ___________________________________

OPTION 2 TOTAL THREE-YEAR COST ___________________________________

In submitting this proposal, it is understood that it is the right of the Township to reject any or all proposals or parts thereof, and to waive any informalities or technicalities in said proposals. This proposal shall remain firm for at least ninety (90) days from bid opening.

The undersigned further agrees that he or it possesses the necessary skill required to determine the adequacy of the Township's bid specifications for the purpose of arriving at the contract price,

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 19

and that he has exercised this skill and that he finds them fit and sufficient for the purpose intended and free from ambiguities, and also has carefully examined the Instructions to Bidders and other Contract Documents and the site of the work, and from his own investigations, has satisfied himself as to the nature and location of the work, the character of the work to be encountered, the equipment and other facilities needed for the performance of the work, the general and local conditions, and other matters which may in any way affect the work or its performance and that he has complied with every requirement of this invitation.

Accompanying this proposal is a certified check or bid bond in the amount of TWENTY THOUSAND ($20,000.00) DOLLARS made payable to the Township, which it is agreed will be forfeited as liquidated damages if the undersigned fails to execute the contract and furnish the performance bond and evidence of insurance, as specified, within 14 days after notification of the award of the contract is mailed to him at the official address of the undersigned below.

Accompanying this Proposal Form is the:

  1. Bid Bond,
  2. Consent of Surety,
  3. Bidder’s qualifications,
  4. Affidavit affirming the person who signed the bid is authorized to do so,
  5. Affidavit accepting the provisions of the PA Workmen’s Compensation Act,
  6. Affidavit of Non-Collusion,
  7. Affidavit accepting the provisions of the Omnibus Transportation Employee Testing Act of 1991.
  8. Proposal Breakdown.

(IF A CORPORATION)

Attest: ________________________________________

Title: ________________________________________ Name of Corporation: ________________________________________

Title: ________________________________________ Address: ________________________________________

City, State, Zip Code: ________________________________________

Telephone Number: ________________________________________

(Seal)

Incorporated under the laws of the State of ________________________________________ and (has, has not) been granted a Certificate of Authority to do business in the Commonwealth of Pennsylvania.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 20

(IF AN INDIVIDUAL OR A PARTNERSHIP)

Witness: ________________________________________ Signed: ________________________________________ (Seal)

* ________________________________________

Address: ________________________________________

City, State, Zip Code: ________________________________________

Telephone Number: ________________________________________

Witness: ________________________________________ Partner: ________________________________________

Partner: ________________________________________

Partner: ________________________________________

* ________________________________________ is a co-partnership trading and doing business under this firm name with ________________________________________ as partners.

* ________________________________________ is an individual or partnership under a fictitious name and (has, has not) registered under the Fictitious Name Act of the Commonwealth of Pennsylvania.

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 21

PROPOSAL BREAKDOWN

Company Name __________________________________________________

OPTION 1 - UNLIMITED MUNICIPAL WASTE – TWICE A WEEK COLLECTION

A. COLLECTION - FIRST YEAR

1. Curbside collection of municipal waste, bulk trash items, yard waste, leaf waste, Christmas trees and recyclables.

Monthly cost per dwelling unit ____________________

Times the number of dwelling units 3291

Monthly total cost ____________________

B. COLLECTION - SECOND YEAR

1. Curbside collection of municipal waste, bulk trash items, yard waste, leaf waste, Christmas trees and recyclables.

Monthly cost per dwelling unit ____________________

Times the number of dwelling units 3291

Monthly total cost ____________________

C. COLLECTION - THIRD YEAR

1. Curbside collection of municipal waste, bulk trash items, yard waste, leaf waste, Christmas trees and recyclables.

Monthly cost per dwelling unit ____________________

Times the number of dwelling units 3291

Monthly total cost ____________________

OPTION 1

FIRST YEAR COSTS

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 22

Item #1 (Monthly total cost X12) ____________________

SECOND YEAR COSTS

Item #1 (Monthly total cost X 12) ____________________

THIRD YEAR COSTS

Item #1 (Monthly total cost X 12) ____________________

DUTTS MILL CREDIT (See Section 9H)

Credit per unit per month (Years 1, 2 & 3) ____________________

Credit per unit per month X 18 Units X 36 Months Deduct ____________________

OPTION 1 - TOTAL THREE-YEAR COST ____________________

OPTION 2 – UNLIMITED MUNICIPAL WASTE - ONCE A WEEK COLLECTION

A. COLLECTION - FIRST YEAR

1. Curbside collection of municipal waste, bulk trash items, yard waste, leaf waste, Christmas trees and recyclables.

Monthly cost per dwelling unit ____________________

Times the number of dwelling units 3291

Monthly total cost ____________________

B. COLLECTION - SECOND YEAR

1. Curbside collection of municipal waste, bulk trash items, yard waste, leaf waste, Christmas trees and recyclables.

Monthly cost per dwelling unit ____________________

Times the number of dwelling units 3291

Monthly total cost ____________________

C. COLLECTION - THIRD YEAR

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 23

1. Curbside collection of municipal waste, bulk trash item, yard waste, leaf waste, Christmas trees and recyclables.

Monthly cost per dwelling unit ____________________

Times the number of dwelling units 3291

Monthly total cost ____________________

OPTION 2

FIRST YEAR COSTS

Item #1 (Monthly total X 12) ____________________

SECOND YEAR COSTS

Item #1 (Monthly total X 12) ____________________

THIRD YEAR COSTS

Item #1 (Monthly total X 12) ____________________

DUTTS MILL CREDIT (See Section 9H)

Credit per unit per month (Years 1, 2 & 3) ____________________

Credit per unit per month X 18 Units X 36 Months Deduct ____________________

OPTION 2 - TOTAL THREE-YEAR COST ____________________

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 24

AFFIDAVIT

OF AUTHORIZATION TO EXECUTE THE PROPOSAL FORM

__________________________________________________ being first duly sworn, deposes and
(Printed Name)

says that is the __________________________________________________
(Title)

of __________________________________________________
(Company Name)

who signed the foregoing proposal that he was duly authorized to sign on their behalf, and that the bid is the true offer of the bidder and that all declarations and statements contained in the bid are true to the best of his knowledge and belief.

__________________________________________________
(Signature of the person named above)

Sworn to and subscribed by me

this ________ day of ________________________ 2010

________________________________________
Notary Public

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 25

AFFIDAVIT

ACCEPTING THE PROVISIONS OF THE WORKMEN'S COMPENSATION ACT

__________________________________________________ being first duly sworn, deposes and
(Printed Name)

says that is the __________________________________________________
(Title)

of __________________________________________________
(Company Name)

who submitted the foregoing proposal or bid; and that he or it has accepted the provisions of the Workmen's Compensation Act of 1915 of the Commonwealth of Pennsylvania, with its supplements and amendments and have insured their liability hereunder in accordance with the terms of said Act with:

__________________________________________________
(Name of Surety Company)

__________________________________________________
(Signature of the person named above)

Sworn to and subscribed by me

this ________ day of ________________________ 2010

________________________________________
Notary Public

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 26

AFFIDAVIT

OF NON-COLLUSION

__________________________________________________ first duly sworn, deposes and says
(Printed Name)

that he is the __________________________________________________
(Title)

of __________________________________________________
(Company Name)

who signed the above proposal or bid on behalf of the party making the foregoing proposal or bid; that he was duly authorized to sign on their behalf; that the bid is the true offer of the bidder; that such bid is genuine and not collusive or a sham, that said bidder has not colluded, conspired, connived or agreed, directly or indirectly, with any bidder or person, to put in a sham bid, or that such other person shall refrain from bidding, and has not in any manner, directly or indirectly sought by agreement or collusion, or communication or conference with any person, to fix the bid price of affiant or any other bidder, or to fix any overhead, profit or cost element of said bid price, or that of any other bidder, or to secure any advantage against the Township or any person interested in the proposed contract; and that all declarations and statements contained in said proposal or bid are true to the best of his knowledge or belief; and, further, that such bidder has not directly or indirectly submitted this bid, or the contents hereof, or divulged information or data thereto to any association or to any member or agent thereof.

__________________________________________________
(Signature of the person named above)

Sworn to and subscribed by me

this ________ day of ________________________ 2010

________________________________________
Notary Public

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 27

AFFIDAVIT

ACCEPTING THE PROVISIONS OF OMNIBUS TRANSPORTATION EMPLOYEE TESTING ACT OF 1991

__________________________________________________ being first duly sworn, deposes and
(Printed Name)

says that is the __________________________________________________
(Title)

of __________________________________________________
(Company Name)

who submitted the foregoing proposal or bid; and that he or it has accepted the provisions of the Omnibus Transportation Employee Testing Act of 1991 and that they are participating in a Drug and Alcohol Program as required by this Act.

__________________________________________________
(Signature of the person named above)

Sworn to and subscribed by me

This ________ day of ________________________ 2010

________________________________________
Notary Public

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 28

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 29

AGREEMENT BETWEEN EAST GOSHEN TOWNSHIP AND CONTRACTOR

THIS AGREEMENT, made the ________ day of ________________________ , in the year 2010 by and between __________________________________________________ hereinafter called the CONTRACTOR, and East Goshen Township, Chester County, Pennsylvania, hereinafter called the TOWNSHIP.

Witnessed that the CONTRACTOR and the TOWNSHIP for the considerations hereafter named, agree as follows:

ARTICLE 1 - SCOPE OF WORK: The CONTRACTOR shall furnish all the materials, equipment and labor and perform all of the work for the collection of municipal waste and recyclable materials in accordance with the contract documents.

ARTICLE 2 - THE CONTRACT: The TOWNSHIP shall pay the CONTRACTOR for the performance of the contract, in accordance with the contract documents, as follows: At the first regularly scheduled meeting of the Board of Supervisors after receipt of the invoice and monthly thereafter.

ARTICLE 3 - THE CONTRACT DOCUMENTS: This Agreement and the following enumerated documents form the contract and they are as fully a part of the contract as if attached hereto or hereinafter repeated, and are termed the Contract Documents.

  1. Notice to Bidders
  2. Instructions to Bidders
  3. Proposal Form
  4. Performance Bond
  5. Affidavits of Execution of the Proposal, Non-Collusion, Workmen’s Compensation Act, & Omnibus Transportation Employee Testing Act.
  6. Addenda (is applicable)
  7. East Goshen Township Municipal Waste and Recycling Ordinance
  8. Chester Counties and East Goshen Township Recyclable Marketing and Processing Agreement

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc 30

ARTICLE 4 - COMMENCEMENT TIME: The CONTRACTOR hereby agrees to commence work under this contract on January 1, 2011.

IN WITNESS WHEREOF, the parties hereto set their hands and seal the day and year first above written.

[Watermark: DRAFT]

EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS

Township Secretary

CONTRACTOR

Witness

Title

F:\Data\Shared Data\Refuse Recycling\2010 Re Bid\REFUSE BID SPECS.doc

31

BID BOND

BIDDER (Name and Address):
__________________________________________________
__________________________________________________
__________________________________________________

SURETY (Name and Address of Principal Place of Business):
__________________________________________________
__________________________________________________
__________________________________________________

OWNER (Name and Address):
__________________________________________________
__________________________________________________
__________________________________________________

BID

BID DUE DATE: ________________________________________
PROJECT – INCLUDING ALL ALTERNATES (Brief Description Including Location):
__________________________________________________
__________________________________________________
__________________________________________________

BOND

BOND NUMBER: ________________________________________
DATE (Not later than Bid Due Date): ________________________________________
PENAL SUM: ________________________________________

IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on page 2 hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

BIDDER

________________________________________ (Seal)
Bidders Name and Corporate Seal

By: ________________________________________
Signature and Title

Attest: ________________________________________
Signature and Title

SURETY

________________________________________ (Seal)
Surety's Name and Corporate Seal

By: ________________________________________
Signature and Title
(Attach Power of Attorney)

Attest: ________________________________________
Signature and Title

Note: (1) Above addresses are to be used for giving notice.
(2) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

EJCDC NO. 1910-28-D (1990 Edition)
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder any difference

Brandywine Homes CDBG
CTCP 08-04 April 2008
Page 1

between the total amount of Bidder's bid, including any accepted Alternates, and the total amount of the bid of the next lowest, responsible and responsive bidder as determined by Owner for the Work required by the Contract Documents, provided that:
1.1. If there is no such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and
1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents.

3. This obligation shall be null and void if:
3.1. Owner accepts Bidder's bid and bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents, or
3.2. All bids are rejected by Owner, or
3.3. Owner fails to issue a notice of award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice of award including extensions shall not in the aggregate exceed 120 days from Bid Due Date without Surety's written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid Due Date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term "bid" as used herein includes a bid, offer or proposal, inclusive of all Alternates, as applicable.

Brandywine Homes CDBG
CTCP 08-04 April 2008
Page 2

CONSENT OF SURETY COMPANY

IN ACCORDANCE with the provisions of the BID dated ________________________________________

Between
the __________________________________________________
(Owner)

and
__________________________________________________
(Contractor)

the __________________________________________________
(Surety)

SURETY on the Bid Bond of
__________________________________________________
(Contractor)

acknowledges that Contractor, if awarded the Bid will provide to Owner a Performance Bond in the amount of 100% of the amount of the contract award.

IN WITNESS WHEREOF, said SURETY has hereunto set its hand and seal this ________ day of ________________________ , 20___ .

ATTEST: SURETY

______________________________ BY: ______________________________
Name
Title

NOTE: This statement, if executed by any person other than the President or Vice President of the Company, must be accompanied by a certificate of even date showing authority conferred upon the person so signing to execute such instruments on behalf of the Company represented.

PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS that we, ______________________________ __________________________________________________ (Name of Contractor) of __________________________________________________ (Address of Contractor), a __________________________________________________ as Principal (the "Principal"), and (Corporation, Partnership or Individual) __________________________________________________ , a corporation organized (Name of Surety) and existing under laws of the State of ______________________________ , with its principal place of business at __________________________________________________ as Surety (Address of Surety) (the "Surety"), are held and firmly bound unto ________________________________________ (Name of Owner) (the "Obligee"), as hereinafter set forth, in the full and just sum of ______________________________ Dollars ($___________________ ), lawful money of the United States of America, for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WITNESSETH THAT:

WHEREAS, The Principal heretofore has submitted to the Owner a certain proposal, dated ____________________ 20___ (the "Proposal"), to perform certain ______________________________ work for the Owner, in connection with ______________________________________________________________________ , pursuant to plans, specifications and other related documents constituting the contract documents, which are incorporated into the Proposal by reference (the "Contract Documents"), as prepared by ________________________________________ , of ________________________________________ , Pennsylvania; and

1

WHEREAS, the Obligee is a "contracting body" under provisions of Act No. 385 of the General Assembly of the Commonwealth of Pennsylvania, approved by the Governor on December 20, 1967, known and sited as the "Public Works Contractor's Bond Law of 1967" (the "Act"); and

WHEREAS, the Act, in Section 3(a), requires that, before an award shall be made to the Principal by the Obligee in accordance with the Proposal, the Principal shall furnish this Bond to the Obligee, with this Bond to become binding upon the award of a contract to the Principal by the Obligee in accordance with the Proposal; and

WHEREAS, it also is a condition of the Contract Documents that this Bond shall be furnished by the Principal to the Obligee; and

WHEREAS, under the Contract Documents, it is provided, inter alia, that if the Principal shall furnish this Bond to the Obligee, and if the Obligee makes an award to the Principal in accordance with the Proposal, then the Obligee may require the Principal to enter into an agreement with respect to performance of such work (the "Agreement"), the form of which Agreement is set forth in the Contract Documents.

NOW, THEREFORE, the terms and conditions of this Bond are and shall be that:

a) If the Principal well, truly and faithfully shall comply with and shall perform the Agreement in accordance with the Contract Documents, at the time and in the manner provided in the Agreement and in the Contract Documents, and if the Principal shall satisfy all claims and demands incurred in or related to the performance of the Agreement by the Principal, and if the Principal shall indemnify completely and shall save harmless the Obligee and all of its officers, agents and employees from any and all costs and damages which the Obligee and all of its officers, agents and employees may sustain or suffer by reason of the failure of the Principal to do so, and if the Principal shall reimburse completely and shall pay to the Obligee any and all costs and expenses,

2

including attorneys fees, which the Obligee and all of its officers, agents and employees may incur by reason of any such default or failure of the Principal; and

(b) If the Principal shall remedy, without cost to the Obligee, all defects which may develop during the period of one (1) year from the date of completion by the Principal and acceptance by the Obligee of the work to be performed under the Agreement in accordance with the Contract Documents, which defects, in the sole judgment of the Obligee or its legal successors in interest, shall be caused by or shall result from defective or inferior materials or workmanship; then this Bond shall be void; otherwise, this Bond shall be and shall remain in force and effect.

This Bond is executed and delivered under and subject to the Act, to which reference hereby is made.

The Principal and the Surety agree that any alterations, changes and/or additions to the Contract Documents, and/or any alterations, changes and/or additions to the work to be performed under the Agreement in accordance with the Contract Documents, and/or any alterations, changes and/or additions to the Agreement and/or any giving by the Obligee of any extensions of time for the performance of the Agreement in accordance with the Contract Documents, and/or any act of forbearance of either the Principal or the Obligee toward the other with respect to the Contract Documents and the Agreement, and/or the reduction of any percentage to be retained by the Obligee as permitted by the Contract Documents and by the Agreement, shall not release, in any manner whatsoever, the Principal and the Surety, or either of them, or their heirs, executors, administrators, successors and assigns, from liability and obligations under this Bond; and the Surety, for value received, does waive notice of any such alterations, changes, additions, extensions of time, acts of forbearance and/or reduction of retained percentage.

3

Provided, that it is expressly agreed that this Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, upon amendment to the Agreement or the Contract Documents not increasing the contract price more than twenty percent (20%), so as to bind the Principal and the Surety to the full and faithful performance of the Agreement and the Contract Documents as so amended. The term "Amendment", wherever used in this Bond and whether referring to this Bond, the Agreement or the Contract Documents, shall include any alteration, addition, extension or modification of any character whatsoever.

Provided, further, that no final settlement between the Obligee and the Principal shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

The Surety shall not be liable in the aggregate to the Obligee for more than the total sum set forth above. The Surety may elect to make any payment hereunder to either Obligee or both, by its check issued jointly or individually.

IN WITNESS WHEREOF, the Principal and the Surety cause this Bond to be signed, sealed and delivered this ________ day of ________________________, 20___.

(Individual Principal)

WITNESS:

____________________________________ (SEAL)
(Signature of Individual)

Trading and doing business as:

____________________________________

____________________________________

(Partnership Principal)

WITNESS:

____________________________________
(Name of Partnership)

By: ____________________________________(SEAL)
(Partner)

4

(Corporation Principal)

____________________________________
(Name of Corporation)

By: ____________________________________
(Vice) President

ATTEST:

____________________________________
(Assistant) Secretary

(CORPORATE SEAL)

or (if appropriate)

WITNESS:

____________________________________
(Name of Corporation)

____________________________________ *By: ____________________________________
(Authorized Representative)

(CORPORATE SEAL)

*Attach appropriate proof, dated as of the same date as the Bond, evidencing authority to execute on behalf of the corporation.

(Corporate Surety)

WITNESS:

____________________________________
(Name of Corporation)

____________________________________ **By: ____________________________________
(Attorney-in-fact)

(CORPORATE SEAL)

**Attach an appropriate power of attorney, dated as of the same date as the Bond,8 evidencing the authority of the Attorney-in-fact to act on behalf of the corporation.

5

NOTE: Date of BOND must not be prior to date of Notice of Intent to Award.
If CONTRACTOR is partnership, all partners should execute BOND.

IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in Pennsylvania.

6

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

August 20, 2010

To: Board of Supervisors

From: Mark Miller

Re: Truck Repair

I have received estimates to get three of the large dump trucks sent out to get the frames and bodies sand blasted and re-painted. This work is needed to preserve the bodies of the truck due to large amounts of rust.

The cost will be $3,245.00 per truck (this price includes new wire harnesses for the dump bodies.

(note) Truck #37 will only cost $1,340.00 by applying insurance monies from the hydrant incident during the blizzard.

Sub Total$9,735.00
Ins. Monies- $1,340.00
Total Cost$8,395.00

F:\Data\Shared Data\Public Works Dept\Memos to BOS\memo for truck repair 2010 August 20.doc

[Drawing of the seal of the Commonwealth of Pennsylvania with motto: VIRTUE LIBERTY AND INDEPENDENCE]

DISTRICT ATTORNEY'S OFFICE OF CHESTER COUNTY

201 WEST MARKET STREET, SUITE 4450
POST OFFICE BOX 2746
WEST CHESTER, PENNSYLVANIA 19380-0989
TELEPHONE: 610-344-6801
FAX: 610-344-5905

Joseph W. Carroll
District Attorney

Patrick Carmody
First Assistant District Attorney

James C. Vito
Chief County Detective

Shawn D. Riley, Sr.
W.E.B. Administrator

August 11, 2010

Westtown-East Goshen Police Department
Chief John Dumond
1041 Wilmington Pike
West Chester, PA 19382

RE: Victims Compensation Assistance Program

Dear Chief Dumond: [handwritten: John]

I congratulate you on your commitment to helping crime victims and their families as demonstrated by your excellent record of responsiveness to the Victims Compensation Assistance Program of the Pennsylvania Commission on Crime and Delinquency. Your timely communications and other assistance to the Victims Compensation Assistance Program allow victims in your jurisdiction to receive all of the benefits available as quickly as possible.

There are over 1,200 police departments in Pennsylvania. In 2008 you were one of only 228 police departments who consistently responded to requests for information concerning victim assistance within 15 days or less. You were one of 7 departments in Chester County to do so. You should be very proud not only of your department's outstanding direct law enforcement services, but also for your record of providing comfort and assistance to your victims. Congratulations on a job well done.

Sincerely,

[Signature: Joe]
Joseph W. Carroll,
District Attorney

JWC/cc
Cc: Board of Supervisors

East Goshen Township Code Enforcement

Report Date 08/02/10 Monthly Permit Log PAGE 1
From 07/01/10 to 07/31/10
MPRP14 run by TERRY B. 3 : 24 PM

Permit # Date Owner Name / Adddress Description / Tax ID Value Fees
B1029507/01/10LOBB, STEPHEN R & DEBORAH
1663 BOW TREE DR
Building: Patio
04L-0071.0000
8,000364.00
B1029607/01/10VAITES GEORGE R VAITES SUSAN M
239 CHESHIRE CIR
Building: HVAC system
06C-0109.0000
9,000104.00
B1029707/06/10GOSHEN EQUITIES LLC
1500 1520 PAOLI PK
Sign Permit: Less than 32 Sq feet
04 -0077.0000
2950.00
B1029807/06/10JOHNSON WILLIAM H JR
1000 HERSHEY MILL RD
Building: Re-Decking
01 -0019.0200
5,000154.00
B1029907/07/10MCCLAIN LEONARD W & ELEANOR RUTH
1620 WILLIAMS WAY
Building: RESIDENTIAL ALTERATION
06D-0044.0000
2,000104.00
B1030007/07/10STARBUCK ROBERT R & MARY W
1787 JEFFERSON DOWNS
Building: RESIDENTIAL ALTERATION
04 -0132.2800
7,500204.00
B1030107/07/10GOSHEN BAPTIST CHURCH
1451 WEST CHESTER PIKE
Building: Commercial Alteration
06 -0106.000E
4,7550.00
B1030207/07/10MULLEN MATTHEW J & CHRISTINE
1661 E STRASBURG RD
Building: New Construction
04 -0134.0200
1,900,00011,526.53
B1030307/08/10PAOLI PIKE ASSOCIATES LP
1585 PAOLI PIKE
Sign Permit: Less than 32 Sq feet
04 -0043.0000
12525.00
B1030407/08/10GOSHEN VALLEY RECREATION CENTER INC
1326 WEST CHESTER PK
Building: Commercial Residing
06 -0133.0700
22,6500.00
B1030507/08/10B B & C PARTNERSHIP
1 RESERVOIR RD
Building: Commercial Alteration
06 -0087.0000
32,000574.00
B1030607/09/10GAILEY III, JOELLEN BERGER & JOHN R
22 TREEMONT DR
Building: Re-Decking
02 -0020.0200
9,800364.00
B1030707/09/10DORSEY JAMES M & LUCIA I
1020 HERSHEYS MILL RD
Building: Building Addition
01 -0056.0000
200,654425.53
B1030807/09/10BLESSING EUGENE F & MARY C
1095 LINCOLN DR
Building: RESIDENTIAL ALTERATION
01R-0308.0000
38,571389.71
B1030907/12/10MAHAN, RICHARD C & JUNE L
1060 KENNETT WAY
Building: RESIDENTIAL ALTERATION
01R-0261.0000
30,340307.40
B1031007/12/10GOLDBERG LAWRENCE A & DARCI L
1409 WEST CHESTER PK
Building: Commercial Alteration
06F-0050.0000
2,4000.00
B1031107/12/10MINNITI DORIS
961 CORNWALLIS DR
Building: Re-Decking
04 -0065.0200
22,500154.00
B1031207/13/10WALHEIM RAYMOND K & JENNIFER L
804 COTTONWOOD LA
Building: Building Addition
02E-0089.0000
270,000635.00
B1031307/13/10HARRISON THEODORE HARTLEY III & NANCY M
1334 E STRASBURG RD
Building: RESIDENTIAL ALTERATION
06 -0031.0000
2,000104.00
B1031407/13/10BOWMAN KENNETH B & SAMANTHA M
1636 ACHCOM WAY
Building: RESIDENTIAL ALTERATION
04L-0012.0000
20,000104.00
B1031507/14/10FAY STEVEN J & CATHY N
804 GRIST MILL LN
Building: Patio
04 -0672.0000
14,8820.00
B1031607/14/10KIMMERLY MICHELLE
622 SUMMIT HOUSE
Building: HVAC system
06 -1526.22H0
B1031707/15/10SIVO ANTHONY J & CHRISTINA
1454 GLENBROOK LA
Building: Re-Roofing
06C-0028.0000
B1031807/15/10O'HARA, JAMES & KAREN
29 WATERVIEW RD
Building: Re-Roofing
06B-0007.0000
B1031907/15/10PASTORINO PAMELA D & MICHAEL B
1511 CALHOUN DR
Building: Re-Roofing
06C-0052.0000

East Goshen Township Code Enforcement

Report Date 08/02/10 Monthly Permit Log PAGE 2
From 07/01/10 to 07/31/10
MPRP14 run by TERRY B. 3 : 25 PM

Permit # Date Owner Name / Adddress Description / Tax ID Value Fees
B1032007/16/10PULTE HOMES OF PA
818 GRIST MILL LN
Building: New Construction
04 -0665.0000
175,0000.00
B1032107/16/10PULTE HOMES OF PA
816 GRIST MILL LN
Building: New Construction
04 -0666.0000
175,0000.00
B1032207/16/10PULTE HOMES OF PA
811 GRIST MILL LN
Building: New Construction
04 -0715.0000
175,0000.00
B1032307/16/10PULTE HOMES OF PA
813 GRIST MILL LN
Building: New Construction
04 -0716.0000
175,0000.00
B1032407/16/10KERR KELLY B
77 HARRISON RD E
Building: Re-Roofing
06 -1889.0000
7,600104.00
B1032507/19/10MEADE ERNEST B
78 HARRISON RD E
Building: Re-Roofing
06 -1890.0000
5,710104.00
B1032607/19/10ESTY BOB & KAREN
814 GRIST MILL LN
Building: RESIDENTIAL ALTERATION
04 -0667.0000
20,000204.00
B1032707/19/10MACDONALD EDWARD J & COLLEEN M
1445 LINDEN LA
Building: Re-Roofing
04E-0026.0000
8,000104.00
B1032807/20/10REDEEMED PROPERTIES LP
1596 PAOLI PK
Sign Permit: 32 Square feet or more
04 -0081.0000
00.00
B1032907/20/10WIECHEC FRANK J III & DEBORAH B
1404 MILL CREEK DR
Building: RESIDENTIAL ALTERATION
03 -0004.0500
20,0000.00
B1033007/21/10CROCE JOHN P & CHRISTINE
459 GATESWOOD DR
Building: Building Addition
04P-0104.0000
90,0000.00
B1033107/21/10BOLAND ROBERT & THERESA
620 THORNCROFT DR
Building: Building Addition
04 -0132.3500
145,0000.00
B1033207/22/10HUGGINS MICHAEL & LISA
1452 BLANFORD LA
Building: Residing
01 -0057.1100
56,280566.80
B1033307/22/10COOPER EMILIO A & ELISE T
614 BEAUMONT CIR
Pool: Jaquzzis & Hot Tubs
04L-0045.0000
8,0000.00
B1033407/22/10DROOGAN CHRISTOPHER J & BARBARA MUNDIE
1425 ARDLEIGH CIR
Building: HVAC system
04 -0107.0600
36,300367.00
B1033507/23/10LICCI JANET J
468 GATESWOOD LA
Building: HVAC system
04P-0095.0000
11,719121.19
B1033607/23/10KELLY WILLIAM F & ELIZABETH S
1123 TAYLOR AVE
Building: Residing
02 -0048.0600
14,3500.00
B1033707/26/10EBERSOLE BERNARD W III & JENNIFER J
208 N CHESTER RD
Building: Commercial Alteration
06 -0101.0000
4,000104.00
B1033807/26/10GOMBAR CHARLES T & FELICE A
1652 BOW TREE DR
Building: Re-Roofing
04L-0100.0000
3,200104.00
B1033907/26/10SOURDIS LUIS F & MARIA
1543 TANGLEWOOD DR
Building: Re-Roofing
02J-0001.0000
11,855122.55
B1034007/28/10THORNDALE INVESTMENT GROUP
1594 PAOLI PK
Building: Commercial Alteration
04 -0080.0100
6000.00
B1034107/28/10CORNELIUS SUSAN J
1116 TAYLOR AVE
Building: Re-Roofing
02 -0066.0000
4,2000.00
B1034207/30/10ABATE, ANTHONY & BERNADETTE
1602 WILLIAMS WAY
Building: Re-Roofing
06D-0025.0000
12,0000.00
B1034307/30/10CROSS KATHERINE
373 DEVON WAY
Building: RESIDENTIAL ALTERATION
04A-0103.0000
23,5500.00
R1015307/01/10HAMILTON THOMAS J & GURNEY T
103 ASHTON WAY
RESIDENTIAL RESALE INSPECTION FEE
02P-0191.0000
050.00

East Goshen Township Code Enforcement

Report Date 08/02/10 Monthly Permit Log PAGE 3
From 07/01/10 to 07/31/10
MPRP14 run by TERRY B. 3 : 25 PM

Permit # Date Owner Name / Adddress Description / Tax ID Value Fees
R1015407/01/10CROSBY ALICE M
847 JEFFERSON WAY
RESIDENTIAL RESALE INSPECTION FEE
02 -0799.0000
050.00
R1015507/01/10HOWER MARILYN K
810 JEFFERSON WAY
RESIDENTIAL RESALE INSPECTION FEE
02 -0762.0000
050.00
R1015607/01/10GLANCEY MARYETTA
60 ASHTON WAY
RESIDENTIAL RESALE INSPECTION FEE
02P-0148.0000
050.00
R1015707/01/10FRANK PAUL T & MARJORIE M
880 JEFFERSON WAY
RESIDENTIAL RESALE INSPECTION FEE
02 -0832.0000
050.00
R1015807/01/10STINSON TIMOTHY & JOYCE
1705 CLOCKTOWER DR
RESIDENTIAL RESALE INSPECTION FEE
04 -0556.0000
050.00
R1015907/07/10WATERHOUSE-KOSKI LINDA
734 N CHESTER RD
RESIDENTIAL RESALE INSPECTION FEE
04 -0082.0000
050.00
R1016007/08/10BURKE EUGENE F MELI LINDA R
403 VALLEY DR
RESIDENTIAL RESALE INSPECTION FEE
06 -0225.0000
050.00
R1016107/09/10RESNICK ADAM J & ROBIN G
826 COTTONWOOD DR
RESIDENTIAL RESALE INSPECTION FEE
02E-0064.0000
050.00
R1016207/12/10MATTIA JOHN & DONNA
3321 VALLEY DR
RESIDENTIAL RESALE INSPECTION FEE
06 -0853.0000
050.00
R1016307/12/10FORCINO, ELAINE M
2027 VALLEY DR
RESIDENTIAL RESALE INSPECTION FEE
06 -0439.0000
050.00
R1016407/12/10FRY DALE E & BARBARA J
975 KENNETT WAY
RESIDENTIAL RESALE INSPECTION FEE
01R-0176.0000
050.00
R1016507/12/10GRAHAM ROSEMARY
210 CHANDLER DR
RESIDENTIAL RESALE INSPECTION FEE
02P-0298.0000
050.00
R1016607/12/10LANDIS JOSHUA D & MELISSA E
207 WALNUT HILL RD B-22
RESIDENTIAL RESALE INSPECTION FEE
06F-0244.0000
050.00
R1016707/16/10COLEMAN DIANE M &
916 ST ANDREWS DR
RESIDENTIAL RESALE INSPECTION FEE
02F-0037.0000
050.00
R1016807/16/10SHERIFF'S DEED HOMESALES INC
1341 E STRASBURG RD
RESIDENTIAL RESALE INSPECTION FEE
06B-0063.0000
050.00
R1016907/16/10GILL HARRY W JR & MILDRED G
1304 ROBYNWOOD LA
RESIDENTIAL RESALE INSPECTION FEE
03 -0081.0000
050.00
R1017007/16/10HILL MARGARET A
1726 HIBBERD LN
RESIDENTIAL RESALE INSPECTION FEE
04 -0702.0000
050.00
R1017107/16/10MATHEIS RICHARD R & DOROTHY V
802 JEFFERSON WAY
RESIDENTIAL RESALE INSPECTION FEE
02 -0754.0000
050.00
R1017207/19/10GROSS MICHAEL F & NICOLE D
1450 GLENBROOK LA
RESIDENTIAL RESALE INSPECTION FEE
06C-0032.0000
050.00
R1017307/21/10DEHAVEN JAMES R & PATRICIA A
723 PEACH TREE DR
RESIDENTIAL RESALE INSPECTION FEE
04 -0435.0000
050.00
R1017407/22/10CALLAGHAN PATRICIA W
606 FRANKLIN WAY
RESIDENTIAL RESALE INSPECTION FEE
02 -0606.0000
050.00
R1017507/22/10BUNDY DEBORAH L & JEFFREY M
532 BEAUMONT CIR
RESIDENTIAL RESALE INSPECTION FEE
04Q-0141.0000
050.00
3,819,94918,694.71

Total Number of Permits : 72