Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
Tuesday, August 18, 2009
8:00 PM

  1. CALL TO ORDER, PLEDGE OF ALLEGIANCE The Chairman will ask if any resident will be recording the meeting.
  2. PUBLIC COMMENT (OPTIONAL)
  3. APPROVAL OF MINUTES August 11, 2009; August 14, 2009
  4. CHAIRMAN'S REPORT Announce that the Minimum Municipal Obligation for 2010 Pensions.
  5. PUBLIC HEARINGS The Board will conduct a public hearing to consider the approval of an ordinance prohibiting the parking of commercial vehicles on public streets.
  6. STAFF REPORT Treasurer's Report - none; Police –John Dumond
  7. OLD BUSINESS
  8. NEW BUSINESS Consider authorizing execution of the agreement for the purchase of a conservation easement for the Hershey's Mill Dam.; Consider township's position with respect to T-Mobile's variance request.
  9. ANY OTHER MATTER
  10. CORRESPONDENCE, REPORTS OF INTEREST Acknowledge the Fire Marshal's and the Goshen Fire Company's reports for July 2009 as well as the 2009 EMS Year-to-Date Statistics.; Acknowledge Site Engineering Concepts, LLC letter informing that Matthew J. & Christine Mullen, 1645 East Strasburg Road will be applying for an individual NPDES permit.; Acknowledge Verizon Communications Inc. letter regarding rate change for Verizon's FIOS TV Premier Service.
  11. MEETINGS AND DATES OF IMPORTANCE August 17, 2009 Deer Committee 7:00 PM August 18, 2009 Board of Supervisors 7:00 PM August 25, 2009 Board of Supervisors ws 7:00 PM
August 27, 2009Zoning Hearing – T-Mobile7:30 PM
September 1, 2009Board of Supervisors7:00 PM
September 2, 2009Planning Commission7:00 PM
September 3, 2009Park & Recreation7:00 PM
September 7, 2009Office Closed
September 8, 2009Board of Supervisors ws7:00 PM
September 9, 2009Conservancy Board7:00 PM
September 10, 2009Historical Commission7:00 PM
September 14, 2009Municipal Authority7:00 PM
September 15, 2009Board of Supervisors7:00 PM
September 21, 2009Deer Committee7:00 PM
September 22, 2009Board of Supervisors ws7:00 PM
September 29, 2009Board of Supervisors ws7:00 PM

12. ADJOURNMENT

BOARD OF SUPERVISORS MEETING
WORKSHOP
Tuesday
August 18, 2009
7:00 PM

  1. Review meeting agenda
  2. Review invoices – none
  3. Action List Verbal update on meter billing; Sullivan’s Grove update; No Swimming signage; Set date for meetings w/visiting nurses and Malvern Library.; Staff recommendation regarding Township Newsletter
  4. Any Other Matter
  5. Liaison Reports
  6. Subdivisions/Land Developments/ZHB Applications
  7. Public Comment
  8. FYI

Reminder –

NEWSLETTER ARTICLE SUBMISSION DUE DATES:DELIVERY DATE:
August 12, 2009October 1, 2009
November 10, 2009January 1, 2010

3. MINUTES
B.
1pg

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
August 14, 2009 – 8:00am
DRAFT MINUTES

Present: Chairman Marty Shane. Joe McDonough and Thom Clapper attended via phone. Also present was Township Manager Rick Smith.

Call to Order & Pledge of Allegiance
Chairman Marty Shane called the meeting to order at 8:00am and led everyone in the Pledge of Allegiance to the Flag.

Resolution 09-112, To Authorize Kathy Brill to Apply for PA Conservation Works! Grant
Marty moved to adopt Resolution 09-112 to authorize Kathy Brill to apply for a grant through the PA Conservation Works! program to install solar panels at the Westtown-East Goshen Regional Police Department building. Thom seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Adjournment
There being no further business, the meeting adjourned at 8:03am.

Respectfully submitted,

Louis F. Smith
Township Manager

8/14/2009 8/14/09 BOS Minutes Page 1 of 1

4. CHAIRMAN'S REPORT
A.
1pg

MEMO

To:Board of Supervisors
From:Deb Beury
Re:2010 Pension MMO
Date:August 11, 2009

The Minimum Municipal Obligation for 2010 is as follows:

Non-Uniformed Defined-Benefit Pension Plan$ 120,497
Fire Defined-Benefit Pension Plan$ 41,367
Police Commission – office staff$ 9,981

8/11/2009 - 1 -

[Handwritten: 5. PUBLIC HEARINGS A. 3 pgs]

EAST GOSHEN TOWNSHIP

CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO. ___________

AN ORDINANCE AMENDING CHAPTER 225 OF THE EAST GOSHEN TOWNSHIP CODE, TITLED "VEHICLES AND TRAFFIC", SPECIFICALLY SECTIONS 225-1 AND 225-22 TO PROHIBIT PARKING OF COMMERCIAL VEHICLES ON ALL STREETS WITHIN THE TOWNSHIP BETWEEN THE HOURS OF 6:00 P.M. TO 6:00 A.M.

WHEREAS, the Board of Supervisors of East Goshen Township (the "Board") has authority pursuant to the Pennsylvania Motor Vehicle Code, 75 Pa. C.S.A. §3353(d), to prohibit, limit or restrict parking of vehicles on any highway within the Township's boundaries where engineering and traffic studies indicate that parking would constitute a safety hazard or where the parking of vehicles would unduly interfere with the free movement of traffic; and

WHEREAS, pursuant to the Pennsylvania Code, Title 67, Chapter 212 §212.114, the Board may restrict parking of vehicles along the curb or edge of a roadway within the Township's boundaries if the distance between the center or the center line pavement markings and the curb or edge of roadway is less then 18 feet; and

WHEREAS, pursuant to the Pennsylvania Code, Title 67, Chapter 212 §212.114, the Board may prohibit certain kinds and classes of vehicles from parking on roadways within the Township's boundaries for safety, capacity or environmental reasons; and

WHEREAS, the Board retained Orth-Rodgers & Associates, Inc. ("Orth-Rodgers") to perform an engineering and traffic study to determine whether or not parking of commercial vehicles on the roadways within the Township constitutes a safety hazard; and

WHEREAS, Orth-Rodgers prepared a traffic study dated July 17, 2009, which indicated that parking of commercial vehicles on all Township roads where the width of the road is 36 feet or less causes site distance restrictions and limits free movement of traffic in both directions and thus causes a safety hazard; and

WHEREAS, based on the results of its traffic study, Orth-Rodgers has recommended that the Board restrict commercial vehicles from parking on all roads in the Township between the hours of 6:00 p.m. and 6:00 a.m.; and

WHEREAS, based on the authority specified in the Motor Vehicle Code and the in the Pennsylvania Code, the Board desires to impose such parking restrictions in order to further the health, safety and welfare of the community.

[Handwritten: 2 of 3]

NOW, THEREFORE, the Board of Supervisors of East Goshen Township, Chester County, Pennsylvania, does hereby enact and ordain as follows:

SECTION I. Section 225-1 of the East Goshen Township Code, titled "Definitions and Interpretations", shall be amended by adding a new subparagraph (d) which shall state as follows:

"(d) Commercial vehicles as used in this chapter shall be defined as any vehicle which has a gross vehicle weight rating (GVWR) either solely or in combination, which exceeds 8,000 pounds or which is in excess of 18 feet in length, regardless of how the vehicle is used."

SECTION II. Section 225-22 of the East Goshen Township Code, titled "Parking Prohibited At All Times", shall be revised by renumbering the existing paragraph to be Section 225-22.A.

SECTION III. A new Section 225-22.B shall be added which shall state as follows:

"B. No commercial vehicle or part thereof having a gross vehicle weight rating (GVWR) either solely or in combination, which exceeds 8,000 pounds or which is in excess of 18 feet in length shall be parked, stored or maintained on any street, road or right of way within the Township between the hours of 6:00 p.m. and 6:00 a.m."

SECTION IV. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.

SECTION V. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.

SECTION VI. Effective Date. This Ordinance shall become effective five days from the date of adoption.

ENACTED AND ORDAINED this _______ day of ____________, 2009.

ATTEST:
Secretary

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
____________________________
E. Martin Shane, Chairman

2

3 of 3

Carmen R. Battavio, Vice-Chairman

Joseph M. McDonough, Member

Donald R. McConathy, Member

Thom Clapper, Ph.D., Member

3

6. STAFF REPORT
B.
3 pgs

MONTHLY ACTIVITY REPORTMONTHLY ACTIVITY REPORT
MONTHLY ACTIVITY REPORT FOR JULY 2009WESTTOWNEAST GOSHENTHORNBURYTOTAL
UCR CLASS
Part IARSONS0000
Part IASSAULTS0202
Part IBURGLARY1023
Part IMURDER AND MANSLAUGHTER0000
Part IRAPE0000
Part IRETAIL THEFT0011
Part IROBBERY0000
Part ITHEFTS915832
Part IICRIMINAL MISCHIEF129021
Part IIDISORDERLY CONDUCT1216331
Part IID.U.I.2103
Part IIHARASSMENT87217
Part IISTOLEN VEHICLES0202
Part IIRECOVERED STOLEN VEHICLES0000
ACCIDENTS1311428
FATAL0000
PEDESTRIAN0000
HIT & RUN2226
INJURED PERSONS1001
ALARMS256713105
AMBULANCE CALLS23774104
Medical Facility Ambulance calls1438052
ANIMAL COMPLAINTS1219435
ARRESTS AND CITATIONS97117
BUSINESS DOOR OPEN0000
DISABLED VEHICLES56213
FAMILY DISTURBANCES79319
FIRE CALLS1219233
HUNTING CALLS0000
INCIDENTS13112038289
KEYS LOCKED78217
MISCELLANEOUS CALLS2119141
WESTTOWNEAST GOSHENTHORNBURYTOTAL
MISSING PERSONS1203
LOCATED1203
MOTOR VEHICLE VIOLATIONS394626111
911 HANG UP CALLS1331650
PARKING VIOLATIONS3003
SUICIDE0000
SUSPICIOUS CONDITIONS24391578
VACATION CHECKS2327

2 of 3

POLICE RADIO ROOM CALLS*452621156100
PERCENTAGE BY INDIVIDUAL TOWNSHIPS - MONTHLY37%50%13%100%
YEAR TO DATE PERCENTAGE BY INDIVIDUAL TOWNSHIPS40%49%11%100%
*NUMBERS ARE PARTIAL BREAKDOWN OF POLICE RADIO ROOM CALLS

3 of 3

MONTHLY ACTIVITY REPORT FOR JULY 2009

CAR #YEAR/MAKE/MODELUNITUSERENDING MILEAGELAST MONTHTOTAL
67-92002 CHEV IMPALAADMINISTRATIONCHIEF DUMOND1112001097001500
67-392007 FORD CROWN VICADMINISTRATIONSGT GORMAN49150477521398
67-362006 FORD EXPEDITIONDETECTIVESDET CAHILL64011629431068
67-102002 CHEV IMPALADETECTIVESDET. BRETZ98761976111150
67-111996 JEEP CHEROKEEDETECTIVESUNDERCOVER/DETECTIVE147087146621466
1996 MITSUBISHIDETECTIVESUNDERCOVER/DETECTIVE67605676050
67-332006 FORD CROWN VICDETECTIVESDET. BALCHUNIS61259599671292
67-382007 FORD CROWN VICDETECTIVESDET. LARGE5270952249460
67-402007 FORD EXPEDITIONDETECTIVESDET. RAGNI4875247864888
67K902003 FORD CROWN VICK9K-96647665772704
67-292004 FORD CROWN VICPATROL1ST LINE PATROL1083691072411128
67-352006 FORD CROWN VICPATROL1ST LINE PATROL64709636991010
67-322006 FORD CROWN VICPATROL1ST LINE PATROL3689736327570
67-372007 FORD CROWN VICPATROL1ST LINE PATROL5398353405578
67-412006 FORD CROWN VICPATROL1ST LINE PATROL52696505902106
67-422008 FORD EXPEDITIONPATROL1ST LINE PATROL29940273782562
67-442008 DODGE CHARGERPATROL1ST LINE PATROL(UNMARKED)26319251501169
67-432008 FORD CROWN VICPATROL1ST LINE PATROL31772293042468
67-452008 FORD CROWN VICPATROL1ST LINE PATROL31366291962170
67-462009 DODGE CHARGERPATROL1ST LINE PATROL874969041845
67-472009 DODGE CHARGERPATROL1ST LINE PATROL1060073923208
67-482009 DODGE CHARGERPATROL1ST LINE PATROL689250381854
67-492009 DODGE DURANGOPATROL1ST LINE PATROL794557412204
67-302004 FORD CROWN VICTRAFFICTRAFFIC UNIT(UNMARKED)5475154370381
DISTRICT COURT DISBURSEMENTSAMOUNTS
EAST GOSHEN TWP$2,875.08
WESTTOWN TWP$2,652.10
THORNBURY TWP$676.55

8. NEW BUSINESS
B.
16 pgs

MEMO

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice 610-692-7171
Fax 610-692-8950
E-mail mgordon@eastgoshen.org

Date: August 14, 2009
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: Draft Motions / T-Mobile (V)

Dear Board Members,

The applicant is getting the information you requested together. We have not received the information yet however we will forward it via email as soon as we receive it. The items you should receive are:

  • Amended application narravive amending the height of the proposed pole to an ultimate height of 49’ including antennas
  • RF propagations for existing conditions as well as the proposed 49’ and 65’ pole heights.
  • Rendeerings of pole heights at 49’ and 65’ at the proposed location.

T-Mobile (V):
SUPPORT
I move that we support the Zoning Variance Application for T-Mobile, who is seeking relief from the Zoning Ordinance to erect a Wireless Communication Facility on a utility pole within the right of way along N. Chester Rd. just north of the Boot Road and N. Chester Road adjacent to the New Kent Apartment community, with the following conditions:

OPPOSE
I move that we recommend that the Board of Supervisors oppose the Zoning Variance Application for T-Mobile, who is seeking relief from the Zoning Ordinance to erect a Wireless Communication Facility on a utility pole within the right of way along N. Chester Rd. just north of the Boot Road and N. Chester Road adjacent to the New Kent Apartment community. The applicant has not provided sufficient evidence to support a hardship and the Board believes the relief sought will alter the essential character of the neighborhood.

F:\Data\Shared Data\Property Management\53-4\53-4-76 (New Kent Apts.)\T Mobile Site_Variance_2009\BOS Memo and Draft Motion 081409.doc

AREA CODE 610
692-7171

2 of 16

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

August 7, 2009

East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380

Re: T-Mobile
Variance Request
53-4-76

Dear Board Members:

At our meeting on August 5, 2009 the Planning Commission voted unanimously in favor of the following motion:

I move that we recommend that the Board of Supervisors oppose the Zoning Variance Application for T-Mobile, who is seeking relief from the Zoning Ordinance to erect a Wireless Communication Facility on a utility pole within the right of way along N. Chester Rd. just north of the Boot Road and N. Chester Road adjacent to the New Kent Apartment community. The applicant has not provided sufficient evidence to support a hardship and the Planning Commission believes the relief sought will alter the essential character of the neighborhood.

Very truly yours,
Senya D. Isayeff
Chairman

C:\Documents and Settings\senya\Local Settings\Temporary Internet Files\OLK9\PC Rec to BOS 080709.doc

FILE COPY

3 of 16

EAST GOSHEN TOWNSHIP
ZONING AND HEARING BOARD APPLICATION

1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

Name of Applicant:T-Mobile Northeast LLC
Applicant Address:c/o Donald T. Petrosa, Esq., 109 Chesley Drive
Media, PA 19063
Telephone Number:610-892-1858Fax Number:610-565-0178
Email Address:dp@petrikin.com
Property Address:West side of North Chester Road, North of Boot Road
West Chester, PA 19380
Tax Parcel Number:53-004-0076-0000Zoning District:R5-Urban Residential DistrictAcreage:N/A Right-of-Way

Purpose of Application (check one)
[X] Variance
[ ] Special Exception
[ ] Appeal decision of the Zoning Officer
[ ] Other ________________________

Sections of Zoning Ordinance in which relief is sought:
§240-31.C(3)(h)[2][e][i], [v], & [vii]
§240-12.B, C, & G

Description of the Zoning Relief requested and the future use of the property:
Applicant proposes to replace existing 24’ ± tall PECO Utility Pole with a 65’ ± tall wood pole with 3 proposed T-Mobile antennas, covering coax, 3 proposed microcell equipment cabinets, telco box and distribution panel, all painted to match the utility pole. The utility pole will continue to be used as a utility pole. The telecommunications antennas and equipment will be located on the utility pole, with no equipment being located on the ground.

The Township Zoning Ordinance at §240-31.C(3)(h)[2][e] provides that when approved as a conditional use, in all zoning districts antenna(s) may be attached to an existing structure such as a smokestack, utility pole, water tower, commercial or industrial building or any similar tall structure provided that certain conditions are met. The applicant has a significant gap in its wireless coverage which it is attempting to fill by the proposed installation. Previously, the Zoning Hearing Board granted a variance from §240-31.C(3)(h)[2][e][v] which limits the number of cabinets which may be placed on a utility pole to one cabinet so that the applicant could have 3 cabinets on PECO Utility Pole #187 located on North Chester Road, South of Eldridge Drive.

12-30-08 - 1 -

4 of 16

EAST GOSHEN TOWNSHIP
ZONING AND HEARING BOARD APPLICATION

1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

The Board of Supervisors was about to grant conditional use approval to allow the proposed T-Mobile installation on PECO Utility Pole #187 when PECO advised T-Mobile that that particular pole could not be used because the voltage running through the lines attached to the pole was to high to permit safe access to the antennas. PECO suggested that T-Mobile locate on a guy pole to avoid potential conflicts with the power lines.

The PECO Pole which is to be replaced is a guy pole, however, at 24’ in height, it is not tall enough to allow the antennas to function satisfactorily in T-Mobile’s system to fill the existing gap in coverage. Accordingly, T-Mobile proposes to replace the existing 24’ tall pole with a 65’ tall wood pole.

(See attached)

We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.

T-Mobile Northeast, LLC
BY: Donald T. Petrosa
Signature of Applicant's Attorney

05/29/2009
Date

Attest:

*Please review the formal Planning Commission review procedure on page three.

12-30-08

- 2 -

5 of 16

EAST GOSHEN TOWNSHIP
ZONING AND HEARING BOARD APPLICATION

Description of the Zoning Relief requested and the future use of the property (continued):

Since replacement of an existing utility pole is proposed and then attaching antenna(s) to the replacement utility pole, rather than attaching antenna(s) to a utility pole which was in existence prior to April 7, 1998, a variance from §240-31.C(3)(h)[2][e][vii] is requested. In addition, a variance from §240-31.C(3)(h)[2][e][i] is requested, if required, because the height of the replacement pole and antennas will exceed the height of the original utility pole by more than 25 feet. Also, since applicant proposes more than one equipment cabinet on the replacement utility pole, a variance from §240-31.C(3)(h)[2][e][v] is requested. If the relief requested is granted, Applicant will seek conditional use approval from the Board of Supervisors.

In the alternative, Applicant seeks variances from §240-12.B, C & G which relate to uses permitted by right, permitted conditional uses and lot area, width, building coverage, height and yard regulations in the R-5 Urban Residential District.

Applicant requests any other relief necessary to develop and use the facilities as proposed.

-2a-

6 of 16

EAST GOSHEN TOWNSHIP
ZONING AND HEARING BOARD APPLICATION

1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.

Applicant Name: T-Mobile Northeast, LLC

Application Process Checklist (Administration use only):

Item Date Complete
1. Completed Township Application Form: 6-1-2009
2. All related materials submitted: "
3. Township application and review fees paid: "

Application accepted on 6-1-2009 by MARK GORDON

Official Signature Mark Gordon Title ZONING OFFICER

Review Process Checklist

Item Date
1. Start date: 6-2-09
2. Date of first formal Planning Commission Meeting following complete application: 6-3
3. Date sent to CCPC: —
4. Date sent to Township Engineer: —
5. Date presented to Planning Commission: 7-1
6. Date sent to CB: 6-15
7. Date sent To MA: "
8. Date sent to HC: "
9. Date sent to PRB: "
10. Date sent to TAB: "
11. Date by which the PC must act: 7-1
12. Date by which Board of Supervisors must act: 7-21 - (PRESENTED TO B of S. 7-7.)
13. Drop Dead Date; (Day 60): 8-1
14. Zoning Hearing Date: 7-23 CONT TO 7-27-09
15. Dates of public advertisement: &

East Goshen Township Planning Commission

12-30-08

- 3 -

7 of 16

EAST GOSHEN TOWNSHIP
ZONING AND HEARING BOARD APPLICATION

1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

Procedure for processing Subdivision, Land Development, Conditional Use, Variance, and Special Exception Applications

August 19, 2002
2nd Revision: March 2, 2006

  1. In order for any application to be considered by the Planning Commission it must be submitted to the Township with all required documentation as per the Township Code and with all applicable fees paid. The Township will use a checklist to verify all required documentation has been submitted. Until the application is complete the application will not be considered “filed” by the Township staff. The Planning Commission will acknowledge receipt of the application at their next regularly scheduled meeting.
  2. All materials to be considered at the next regular meeting of the Planning Commission must be submitted with at least eleven (11) copies to the Township Staff by not later than close of business the previous Tuesday. Any materials submitted after that time will be held for the following meeting and not provided to the Commission at the upcoming meeting.
  3. The application review cycle for Subdivision and Land Development Applications shall begin with the next regular meeting of the Commission after the complete application is filed. The application review cycle for Conditional Use, Variance, and Special Exception Applications shall begin the day a complete application is filed with the Township.
  4. Applicants should not distribute material to the Commission during a meeting unless it is directly related to the initial presentation of the application. All materials for the Planning Commission, including any material to be used at a meeting, must be delivered to the Township Staff not later than close of business the previous Tuesday.
  5. The burden of supplying necessary materials to the Planning Commission in a timely manner is on the applicant. Late delivery of material may require an extension on the part of the applicant or a recommendation for denial of the application by the Planning Commission.
  6. Formal application presentations to the Planning Commission will only be made at the regular meeting after the complete application is submitted and accepted by the Township staff.
  7. The application will remain on the Planning Commission’s agenda until such time as the Commission has made its recommendation to the Board of Supervisors and or Zoning Hearing Board.
  8. Applicants are encouraged to attend each Planning Commission meeting in order to answer questions or address issues concerning their application.
  9. Applications will be voted on only during the regular Planning Commission meetings.
  10. The Chairman, in his sole discretion, may waive or modify any of this procedure.

12-30-08

- 4 -

8 of 16

T-Mobile

49' POLE

CMX

T-MOBILE SITE NO.: 1CH6551N
PROPOSED UTILITY POLE
(VIEW 1)

Photo simulation of proposed 49' utility pole along Route 352 (sign labeled SOUTH 352).

9 of 16

Aerial photograph map exhibit showing the proposed site location at North Chester Road and Boot Road, surrounded by residential streets and neighborhoods.

TRUE NORTH

PAOLI PIKE
EAST BOOT ROAD
NORTH CHESTER ROAD
ELDRIDGE DRIVE
BOW TREE DRIVE
BOOT ROAD
BARKER DRIVE
MARYDELL LANE
MARYDELL DRIVE
WYNDHAM LANE
HIGH MEADOW LANE
BANCROFT DRIVE
CHESTER ROAD
NORTH SPEAKMAN LANE
ELDRIDGE DRIVE
BEAUMONT CIRCLE

1

SITE

SUBMITTALS ENGINEER TITLE APPLICANT
PRELIMINARY 06-30-09 CMX
1555 BUSTARD ROAD, SUITE 100
LANSDALE, PA 19446
PH (215) 361-6050
FAX (215) 412-2704
ARIZONA • FLORIDA • MARYLAND • NEVADA • NEW JERSEY • NEW YORK • PENNSYLVANIA • MEXICO
AERIAL EXHIBIT
SITE ID — 1CH6551N
PECO POLE AT NEW KENT APTS
NORTH CHESTER ROAD
WEST CHESTER, PA 19380
T-Mobile
T-MOBILE NORTHEAST, LLC
400 STREET ROAD
BENSALEM, PA 19020
OFFICE: (215) 633-5200
FAX: (215) 633-5393

10 of 16

T-Mobile

49' POLE

CMX

T-MOBILE SITE NO.: 1CH6551N
PROPOSED UTILITY POLE
(VIEW 2)

Photo simulation of proposed 49' utility pole near intersection with signs labeled Boot Rd and NORTH 352.

11 of 16

T-Mobile

65' POLE

CMX

T-MOBILE SITE NO.: 1CH6551N
PROPOSED UTILITY POLE
(VIEW 1)

Photo simulation of proposed 65' utility pole along Route 352 (sign labeled SOUTH 352).

12 of 16

PETRIKIN, WELLMAN, DAMICO, BROWN & PETROSA

A PROFESSIONAL CORPORATION
ATTORNEYS AND COUNSELORS AT LAW

THE WILLIAM PENN BUILDING
109 CHESLEY DRIVE
MEDIA, PA 19063

JOSEPH A. DAMICO, JR.
STEVEN G. BROWN
JOHN W. NILON, JR.^
DONALD T. PETROSA
STEVEN A. COHEN
DENIS M. DUNN*
MARK D. DAMICO
KENNETH D. KYNETT*
H. FINTAN McHUGH*
CHARLES G. MILLER*

*ALSO MEMBER NEW JERSEY BAR
^ALSO MEMBER NY BAR and INTERNATIONAL TRADE COURT

MALCOLM B. PETRIKIN (1934-1995)
JOHN W. WELLMAN (1951-2002)

610-565-2670
FAX 610-565-0178

Direct Dial: 610-892-1858
e-mail: dp@petrikin.com

August 14, 2009

VIA EMAIL

Louis (Rick) Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199

RE: T-Mobile Site #1CH6551N
PECO Pole at New Kent Apartments
West Side of North Chester Road, North of Boot Road
West Chester, PA 19380
Our File No.: 000115-113

Dear Mr. Smith:

At the request of Zoning Officer Mark Gordon, I am writing to confirm that T-Mobile is amending the zoning application filed in the above matter. Originally, T-Mobile sought relief necessary to replace an existing 24’ tall PECO Utility Pole located at or near the New Kent Apartments on the west side of North Chester Road, north of Boot Road, with a 65’ tall wood pole with T-Mobile antennas and equipment cabinets to be located on the replacement utility pole. T-Mobile is now proposing a replacement utility pole that has a wood pole of 40’ with a 72” pole-top extension with antennas at the top, for an overall height of only 49’. Thus the replacement structure is proposed to be only 49’ rather than 65’ as originally proposed. Enclosed herewith are revised zoning drawings showing the details.

13 of 16

PETRIKIN, WELLMAN, DAMICO, BROWN & PETROSA

VIA EMAIL

Louis (Rick) Smith, Township Manager
East Goshen Township
August 14, 2009
Page -2-

If you have any questions, please do not hesitate to contact me.

Very truly yours,
Donald T. Petrosa
DONALD T. PETROSA

DTP/dmo
Enclosures:

cc: Mark A. Gordon, Zoning Officer (Via Email)
Douglas C. Cowan (Via Email)
Philip Burtner, P.E. (Via Email)
Eric Ritter (Via Email)
Bassem Iskander (Via Email)
Danny LaPella (Via Email)

14 of 16

SITE# 1CH6551N

T-Mobile®
T-MOBILE NORTHEAST, LLC
PECO POLE AT NEW KENT APARTMENTS
SITE NO: 1CH6551N
NORTH CHESTER ROAD
WEST CHESTER, PA 19380

KEY MAP

USGS QUADRANGLE 7.5 MINUTE SERIES. Map labels: Goshenville, SITE, Ridley.

DIRECTIONS:

FROM BENSALEM TAKE THE PENNA TURNPIKE (PA T-PK) ONTO I-276 W TOWARD HARRISBURG. TAKE EXIT #326/PHILADELPHIA/VALLEY FORGE US-202N ONTO I-76 E. TAKE EXIT #328A/WEST CHESTER/POTTSTOWN/SWEDESFORD ROAD ONTO US-202 S TOWARD WEST CHESTER. TAKE THE PAOLI EXIT ONTO W SWEDESFORD RD(PA-252 S). CONTINUE TO FOLLOW PA-252 S. TURN RIGHT ON US-30. BEAR LEFT ON PAOLI PIKE. ARRIVE AT SITE ON THE RIGHT.

SITE INFORMATION

Field Value
SITE NAME:PECO POLE AT NEW KENT APARTMENTS
SITE ADDRESS:NORTH CHESTER ROAD, WEST CHESTER, PA 19380
SITE NO.:1CH6551N
JURISDICTION:EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
SITE COORDINATES:N 39° 59' 15.99" (NAD 83), W 75° 32' 26.75" (NAD 83)
GROUND ELEV. (AMSL):460'± (NAVD 88)
STRUCTURE TYPE:WOOD POLE
UTILITY POLE OWNER:PECO
UTILITY POLE OWNER'S ADDRESS:2301 MARKET STREET, PHILADELPHIA, PA 19101
UTILITY POLE OWNER'S CONTACT:REGINA ROBINSON, 215-841-4000
APPLICANT:T-MOBILE NORTHEAST, LLC, 400 STREET ROAD, BENSALEM, PA 19020, 215-633-5200

SHEET INDEX

SHEET NO. SHEET DESCRIPTION
T-1TITLE SHEET
Z-1SITE PLAN
Z-2PARTIAL SITE PLAN & POLE ELEVATION

AREA MAP

Street map indicating SITE at the intersection of E Boot Rd and Route 352 (N Chester Rd). Labels: Boot Rd, N Chester Rd, Cromwell Ln, Greenhill Rd, Goshenville, Paoli Pike, E Boot Rd, 352, West Chester Reservoir, Larch Ln, Tanglewood Dr, New Kent, King Rd, Candlestick Ln, Clocktower Rd, Hicks Ln, Carriage Dr, Peacock Cir, Bramble Ln, Hibberd Ln, Wyllpen Dr, Four Set Dr, Locust Ct.

DO NOT SCALE DRAWINGS

CONTRACTOR TO VERIFY ALL PLANS AND EXISTING DIMENSIONS AND CONDITIONS RELATING TO THIS PROJECT AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK.

Title Block

CMX: 1555 BUSTARD ROAD, SUITE 100, LANSDALE, PA 19446, PH: (215) 361-4000, FAX: (215) 412-2704. ARIZONA - CALIFORNIA - FLORIDA - MARYLAND - NEW JERSEY - NEW YORK - PENNSYLVANIA - TEXAS.

T-Mobile®: T-MOBILE NORTHEAST, LLC, 400 STREET ROAD, BENSALEM, PA 19020, OFFICE: (215) 633-5200, FAX: (215) 633-5393.

SAC : DAN LAPELLA
CONST : PHIL MUSSO
RF : BASSEM ISKANDER
A&E : PHILIP BURTNER

SCHEDULE OF REVISIONS

REV NO. DATE DESCRIPTION OF CHANGES
003-11-09PRELIMINARY ZDs
103-17-09ISSUED FOR ZONING
206-08-09REVISED PER COMMENTS
306-15-09REVISED ANTENNA HEIGHT

DRAWN BY: C.K. | CHECKED BY: P.B.
SCALE: AS NOTED | JOB NO: 09007305

APPROVALS: T-MOBILE, LANDLORD, LEASING, R.F., ZONING, CONSTRUCTION, B3E

NEW KENT APTS, 1CH6551N, N. CHESTER ROAD, WEST CHESTER, PA 19380

DRAWING TITLE: TITLE SHEET | DRAWING SHEET: T-1

Professional Engineer Seal: COMMONWEALTH OF PENNSYLVANIA, REGISTERED PROFESSIONAL ENGINEER, PHILIP A. BURTNER, ENGINEER, PE045379E. PHILIP BURTNER, P.E., PROFESSIONAL ENGINEER SEAL.

15 of 16

SITE PLAN (Z-1) - SITE# 1CH6551N

[Engineering drawing: Site Plan (Sheet Z-1) for T-Mobile Northeast, LLC Site 1CH6551N, PECO Pole at New Kent Apartments, North Chester Road, West Chester, PA 19380, showing the intersection of North Chester Road (S.R. 0352) and Boot Road (S.R. 2020), an existing 2-story brick apartment complex, existing residences, utility poles, right-of-way lines, and an existing 24'± AGL PECO utility pole located within the right-of-way to be replaced with a 40'± AGL wood pole.]

SITE INFORMATION

Field Value
SITE NAME : PECO POLE AT NEW KENT APARTMENTS
SITE ADDRESS : NORTH CHESTER ROAD, WEST CHESTER, PA 19380
SITE NO.: 1CH6551N
JURISDICTION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
SITE COORDINATES : N 39° 59' 13.97" (NAD 83), W 75° 32' 35.76" (NAD 83)
GROUND ELEV. (AMSL) : 450'± (NAVD 88)
STRUCTURE TYPE : WOOD POLE
UTILITY POLE OWNER: PECO
UTILITY POLE OWNER'S ADDRESS : 2301 MARKET STREET, PHILADELPHIA, PA 19101
UTILITY POLE OWNER'S CONTACT: SIMONA ROBINSON 215-841-5385
APPLICANT : T-MOBILE NORTHEAST, LLC, 400 STREET ROAD, BENSALEM, PA 19020, 215-633-5200

GENERAL NOTES:

  • 1. PROPERTY LINE INFORMATION WAS PREPARED USING DEEDS, TAX MAPS, PLANS OF RECORD AND PLANS ENTITLED EXISTING FEATURES PLAN, BY CMX, DATED 03/10/09 AND SHOULD NOT BE CONSTRUED AS AN ACCURATE BOUNDARY SURVEY.
  • 2. THIS PLAN IS SUBJECT TO ALL EASEMENTS AND RESTRICTIONS OF RECORD.
  • 3. NO SIGNIFICANT NOISE, SMOKE, DUST, OR ODOR WILL RESULT FROM THIS FACILITY.
  • 4. THE FACILITY IS UNMANNED AND NOT INTENDED FOR HUMAN HABITATION. THERE IS NO HANDICAP ACCESS REQUIRED.
  • 5. THE FACILITY IS UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR SANITARY SERVICE.
  • 6. THE PROPOSED DEVELOPMENT DOES NOT INCLUDE STREET SIGNS OF ANY TYPE, AND OUTDOOR STORAGE OR ANY SOLID WASTE RECEPTACLES.
  • 7. AT THE TIME OF OUR INITIAL SITE VISIT, CONDITIONS INDICATIVE OF FRESH WATER WETLANDS WERE NOT OBSERVED.
  • 8. PROPOSED SITE IS LOCATED WITHIN FEMA FLOOD ZONE "X" AS SHOWN ON FIRM FLOOD INSURANCE RATE MAP, PANEL 215 OF 380, CHESTER COUNTY, PENNSYLVANIA MAP NUMBER 42029C0215 F, EFFECTIVE SEPTEMBER 29, 2006. ZONE "X" IS DEFINED AS AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN.
  • 9. A 100 WATT LIGHT OPERATED BY A 1 HOUR TIMER SWITCH IS PROPOSED AT THE PROPOSED FACILITY.
  • 10. TOPOGRAPHIC FEATURES SHOWN FROM ACTUAL FIELD SURVEY BY CMX MARCH 5, 2009; AND LIMITED TO SHOWING FEATURES OF INTEREST ONLY. 1 TO 2 INCHES OF SNOW WAS ON THE GROUND AT THE TIME OF THE SURVEY. FEATURES THAT MAY HAVE BEEN OBSCURED BY SNOW ARE NOT SHOWN.
  • 11. HORIZONTAL DATUM IS NAD 83 PENNSYLVANIA SOUTH STATE PLANE GRID ESTABLISHED BY GPS OBSERVATIONS REFERENCED TO THE NGS CORS NETWORK.
  • 12. VERTICAL DATUM IS NAVD 1988 AND ESTABLISHED BY GPS OBSERVATIONS REFERENCED TO THE NGS CORS NETWORK.
  • 13. THIS IS NOT A BOUNDARY SURVEY. A COMPLETE BOUNDARY SURVEY WOULD BE REQUIRED TO SHOW ADDITIONAL BOUNDARY INFORMATION.
  • 14. THIS PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT. OTHER RIGHTS TO PROPERTY MAY EXIST.
  • 15. UNDERGROUND UTILITIES THAT MAY EXIST ARE NOT SHOWN.
  • 16. THIS PLAN DOES NOT SHOW ENVIRONMENTAL HAZARDS, WETLANDS, ARCHEOLOGICAL SITES OR FLOOD PRONE AREAS THAT MAY EXIST ON SITE.
  • 17. RIGHT-OF-WAY WIDTH FOR CHESTER ROAD (ROUTE 352) AND BOOT ROAD FROM FINAL TITLE PLAN OF SUBDIVISION FOR "BOW TREE" BY CHESTER VALLEY ENGINEERS, DATED SEPTEMBER 10, 1985 AND LAST REVISED APRIL 24, 1999; AND NOT VERIFIED BY CMX DURING THIS SURVEY.

SITE PLAN LABELS & LEGEND

  • TRUE NORTH
  • 2 STORY BRICK APARTMENT COMPLEX
  • LANDS N/F HANKIN FAMILY LIMITED PARTNERSHIP, APN # 53-004-0076-0000, DEED BOOK 4283, PAGE 90
  • BUSH
  • EXISTING 24'± AGL PECO U/P LOCATED WITHIN RIGHT-OF-WAY TO BE REPLACED WITH A 40'± AGL WOOD POLE
  • 59'±, 194'±, 189'±
  • 446, 448, 450, 452
  • S/W LINE, O/H LINE, O/H
  • UTILITY POLE NO NUMBER
  • UTILITY POLE #75-16
  • BELL MH RIM 452.12
  • 38' CART-WAY
  • 23'-6" R.O.W. (SEE NOTE 17)
  • 30'-0" R.O.W. (SEE NOTE 17)
  • TITLE LINE
  • NORTH CHESTER ROAD (S.R. 0352)
  • 38'-8" CART-WAY
  • BOOT ROAD (S.R. 2020)
  • CONCRETE ISLAND
  • 52'-6" R.O.W. (SEE NOTE 17)
  • SIGN "SPEED LIMIT 45 MPH"
  • SIGN "NO CROSSING"
  • GUY
  • UTILITY POLE W/UNDERGROUND UTILITY NO NUMBER
  • EXISTING RESIDENCE
  • GRAPHIC SCALE ( IN FEET ) 1 inch = 20 ft.
  • 1 / Z-1 SITE PLAN SCALE: 1" = 20'

TITLE BLOCK & SCHEDULE OF REVISIONS

CMX, 1555 BUSTARD ROAD, SUITE 100, LANSDALE, PA 19446, PH (215) 361-6050, FAX (215) 412-2704

T-Mobile, T-MOBILE NORTHEAST, LLC, 400 STREET ROAD, BENSALEM, PA 19020, OFFICE: (215) 633-5200, FAX: (215) 633-5393

SAC : DAN LAPELLA | CONST : PHIL MUSSO | RF : BASSEM ISKANDER | A&E : PHILIP BURTNER

REV. NO. DATE DESCRIPTION OF CHANGES
3 08-13-09 REVISED ANTENNA HEIGHT
2 08-05-09 REVISED PER COMMENTS
1 03-17-09 ISSUED FOR ZONING
0 03-11-09 PRELIMINARY ZDs

DRAWN BY: C.H. | CHECKED BY: P.B. | SCALE: AS NOTED | JOB NO: 090075301

APPROVALS: T-MOBILE, LANDLORD, LEASING, R.F., ZONING, CONSTRUCTION, BSE

NEW KENT APTS, 1CH6551N, N. CHESTER ROAD, WEST CHESTER, PA 19380

DRAWING TITLE: SITE PLAN | DRAWING SHEET: Z-1

PENNSYLVANIA ONE CALL SYSTEM, INC. 1-800-242-1776 STOP-CALL BEFORE YOU DIG! PENNSYLVANIA LAW REQUIRES THREE WORKING DAYS NOTICE PRIOR TO ANY EARTH MOVING ACTIVITIES

REGISTERED PROFESSIONAL ENGINEER: PHILIP A. BURTNER, PE-049981-R (PHILIP BURTNER, P.E.)

16 of 16

PARTIAL SITE PLAN & POLE ELEVATION (S-1) - SITE# 1CH6551N

[Engineering drawing: Partial Site Plan & Pole Elevation (Sheet S-1) for T-Mobile Northeast, LLC Site 1CH6551N, PECO Pole at New Kent Apartments, showing (1) Partial Site Plan, (2) Pole Elevation of the proposed 40'± AGL wood pole with 72" pole-top extension, 3 T-Mobile antennas, and 3 equipment cabinets, and (3) Equipment Mounting Detail.]

SITE INFORMATION

Field Value
SITE NAME : PECO POLE AT NEW KENT APARTMENTS
SITE ADDRESS : NORTH CHESTER ROAD, WEST CHESTER, PA 19380
SITE NO.: 1CH6551N
JURISDICTION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
SITE COORDINATES : N 39° 59' 13.97" (NAD 83), W 75° 32' 35.76" (NAD 83)
GROUND ELEV. (AMSL) : 450'± (NAVD 88)
STRUCTURE TYPE : WOOD POLE
UTILITY POLE OWNER: PECO
UTILITY POLE OWNER'S ADDRESS : 2301 MARKET STREET, PHILADELPHIA, PA 19101
UTILITY POLE OWNER'S CONTACT: SIMONA ROBINSON 215-841-5385
APPLICANT : T-MOBILE NORTHEAST, LLC, 400 STREET ROAD, BENSALEM, PA 19020, 215-633-5200

GENERAL NOTES

  • 1. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES ORDINANCES, LAWS AND REGULATIONS OF ALL MUNICIPALITIES, UTILITIES COMPANY OR OTHER PUBLIC AUTHORITIES.
  • 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS THAT MAY BE REQUIRED BY ANY FEDERAL, STATE, COUNTY OR MUNICIPAL AUTHORITIES.
  • 3. THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER, IN WRITING, OF ANY CONFLICTS, ERRORS OR OMISSIONS PRIOR TO THE SUBMISSION OF BIDS OR PERFORMANCE OF WORK. MINOR OMISSIONS OR ERRORS IN THE BID DOCUMENTS SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR THE OVERALL INTENT OF THESE DRAWINGS.
  • 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE IMPROVEMENTS PRIOR TO COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED AS A RESULT OF CONSTRUCTION OF THIS FACILITY.
  • 5. THE SCOPE OF WORK FOR THIS PROJECT SHALL INCLUDE PROVIDING ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO COMPLETE THIS PROJECT. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
  • 6. THE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID TO VERIFY THAT THE PROJECT CAN BE CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
  • 7. CONTRACTOR SHALL VERIFY ANTENNA ELEVATION AND AZIMUTH WITH RF ENGINEERING PRIOR TO INSTALLATION.
  • 8. TRANSMITTER AND ANTENNAS ARE DESIGNED TO MEET ANSI/EIA 222-F REQUIREMENTS.
  • 9. ALL STRUCTURAL ELEMENTS SHALL BE HOT DIPPED GALVANIZED STEEL.
  • 10. CONTRACTOR SHALL MAKE A UTILITY "ONE CALL" TO LOCATE ALL UTILITIES PRIOR TO EXCAVATING.
  • 11. IF ANY UNDERGROUND UTILITIES OR STRUCTURES EXIST BENEATH THE PROJECT AREA, CONTRACTOR MUST LOCATE IT AND CONTACT THE APPLICANT & THE OWNER'S REPRESENTATIVE.
  • 12. [illegible]
  • 13. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION BY TECHNICIANS APPROXIMATELY 1 TIME PER MONTH.
  • 14. THIS PLAN IS SUBJECT TO ALL EASEMENTS AND RESTRICTIONS OF RECORD.
  • 15. NO SIGNIFICANT NOISE, SMOKE, DUST, OR ODOR WILL RESULT FROM THIS FACILITY.
  • 16. THE FACILITY IS UNMANNED AND NOT INTENDED FOR HUMAN HABITATION (NO HANDICAP ACCESS REQUIRED).
  • 17. THE FACILITY IS UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR SANITARY SERVICE.

DRAWING LABELS & CALLOUTS

1 / S-1 PARTIAL SITE PLAN (SCALE: 1" = 5')

  • TRUE NORTH
  • EXISTING 24'± AGL PECO U/P LOCATED WITHIN RIGHT-OF-WAY TO BE REPLACED WITH A 40'± AGL WOOD POLE
  • PROPOSED T-MOBILE CABINET (PAINT TO MATCH) (TYP. OF 3)
  • PROPOSED TELCO BOX (PAINT TO MATCH)
  • RIGHT-OF-WAY
  • EDGE OF PAVEMENT/ SINGLE WHITE LINE
  • DOUBLE YELLOW LINE
  • SINGLE WHITE LINE
  • EDGE OF PAVEMENT
  • UTILITY POLE #75-16
  • 446, 448, 450
  • O/H
  • GRAPHIC SCALE ( IN FEET ) 1 inch = 5 ft.

2 / S-1 POLE ELEVATION (SCALE: 1" = 5')

  • (3) PROPOSED T-MOBILE ANTENNAS (PAINT TO MATCH)
  • PROPOSED 72" POLE-TOP EXTENSION
  • PROPOSED 5" U-GUARD COVERING COAX (PAINT TO MATCH)
  • 49'±, 47'±
  • EXISTING OVERHEAD WIRES
  • EXISTING 24'± AGL U/P TO BE REPLACED WITH AN 40'± AGL WOOD POLE WITH (3) T-MOBILE EQUIPMENT CABINETS
  • PROPOSED TELCO BOX (PAINT TO MATCH)
  • PROPOSED EQUIPMENT CABINETS MOUNTED TO UTILITY POLE (PAINT TO MATCH) (TYP. OF 3)
  • PROPOSED DISTRIBUTION PANEL (PAINT TO MATCH)
  • 9'-0", 8'-0"
  • GRADE EL.=0.0'± AGL

3 / S-1 EQUIPMENT MOUNTING DETAIL (NTS)

  • PROPOSED 40'± AGL WOOD UTILITY POLE
  • PROPOSED RBS2109 MOUNTED TO PIPE (TYP. OF 3)
  • PROPOSED 2" GALVANIZED PIPE ANDREW PART #MT648
  • PROPOSED CHAIN MOUNT ANDREW PART #CM-30T-B
  • 1'-8", 2'-0", 0'-9"

TITLE BLOCK & SCHEDULE OF REVISIONS

CMX, 1555 BUSTARD ROAD, SUITE 100, LANSDALE, PA 19446, PH (215) 361-6050, FAX (215) 412-2704

T-Mobile, T-MOBILE NORTHEAST, LLC, 400 STREET ROAD, BENSALEM, PA 19020, OFFICE: (215) 633-5200, FAX: (215) 633-5393

SAC : DAN LAPELLA | CONST : PHIL MUSSO | RF : BASSEM ISKANDER | A&E : PHILIP BURTNER

REV. NO. DATE DESCRIPTION OF CHANGES
3 08-13-09 REVISED ANTENNA HEIGHT
2 08-05-09 REVISED PER COMMENTS
1 03-17-09 ISSUED FOR ZONING
0 03-11-09 PRELIMINARY ZDs

DRAWN BY: C.H. | CHECKED BY: P.B. | SCALE: AS NOTED | JOB NO: 090075301

APPROVALS: T-MOBILE, LANDLORD, LEASING, R.F., ZONING, CONSTRUCTION, BSE

NEW KENT APTS, 1CH6551N, N. CHESTER ROAD, WEST CHESTER, PA 19380

DRAWING TITLE: PARTIAL SITE PLAN & POLE ELEVATION | DRAWING SHEET: S-1

PENNSYLVANIA ONE CALL SYSTEM, INC. 1-800-242-1776 STOP-CALL BEFORE YOU DIG! PENNSYLVANIA LAW REQUIRES THREE WORKING DAYS NOTICE PRIOR TO ANY EARTH MOVING ACTIVITIES

REGISTERED PROFESSIONAL ENGINEER: PHILIP A. BURTNER, PE-049981-R (PHILIP BURTNER, P.E.)

AREA CODE 610
692-7171
www.eastgoshen.org

10 CORRESPONDENCE
A
8 pgs

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FIRE MARSHAL'S REPORT ---- JULY 2009

14 CALLS CONSISTING OF 11 AUTOMATIC ALARMS: 2 FIRES and 1 SMOKE INVESTIGATION: PLUS 13 INSPECTIONS: 3 COMPLAINTS: 1 AUTOMOBILE ACCIDENT and 1 FIRE DRILL:

7/1/09 INSPECTION: follow-up: Bellingham: Brookside Building automatic alarm: bad smoke detector in elevator shaft.

7/2/09 INSPECTION: 1414 East Strasburg Road, Conway Power Equipment.

7/6/09 AUTOMATIC FIRE ALARM: 366 Devon Way, Hershey's Mill.

7/7/09 INSPECTION: annual: 1310 Goshen Parkway: VWR International.

7/7/09 INSPECTION: requested by Patti Page (Property Manager at Goshen Valley) for unit 1201 because items could not be removed for a sheriff's sale due to clutter.Mr. Stingel was not home and no entry was made.

7/8/09 INSPECTION: annual: Greenhill ROad & Route 352, United Church of Christ.

7/8/09 INSPECTION: follow-up: Goshen Valley Unit 1201: met with Ken Stengel (owner): entered the unit at owners invitation: the unit is cluttered causing a potential fire hazard: He said he would clean it up.

7/9/09 INSPECTION: annual: Summit House Condo. Club House.

7/10/09 AUTOMATIC FIRE ALARM: 1030 Hershey's Mill Road: Schmidt

7/11/09 SMOKE INVESTIGATION: 1329Greenhill Road, Colleen Varallo: open burning: left a copy of the burning ordinance.

7/11/09 FIRE: 421 Summit House Condos: dumpster.

7/11/09 AUTOMATIC FIRE ALARM: 813 Tourtrun Drive.

7/13/09 FIRE: 2 Waterview Road: Apt. B2: unattended cooking: Elizabeth Hewlett.

7/14/09 AUTOMATIC FIRE ALARM: 1301 Goshen Parkway, Synthes: working on alarm.

7/14/09 COMPLAINT: open burning: 953 Cornwallis Drive, Judy Bowers: explained the burning ordinance.

2 of 8

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

PAGE "2"

7/15/09 INSPECTION: with Mike: new TV Studio at Hershey's Mill for U & O.

7/15/09 INSPECTION: with Gary: 2 Waterview Road: Mylhos Restaurant: location of smoke detectors and fire extinguishers for U & O.

7/15/09 AUTOMATIC FIRE ALARM: 814 North Chester Road, Friends School.

7/17/09 AUTOMATIC FIRE ALARM: 1469 Morstein Road, Schiffer.

7/18/09 AUTOMATIC FIRE ALARM: Bellingham, Brandywine Building.(D.D)

7/19/09 COMPLAINT: burning: resident on Culberston Circle complained of smoke: 1323 Greenhill Road, Michelle Sheernao burning green brush creating a lot of smoke: extingushed the fire.

7/20/09 AUTOMATIC FIRE ALARM: Bellingham, Brandywine Building: defective head in stairwell.

7/21/09 INSPECTION: follow-up: Bellingham, Brandywine Building: defective head has been replaced.

7/22/09 INSPECTION: annual: 1336 Enterprise Drive, VWR International.

7/22/09 AUTOMOBILE ACCIDENT: Paoli Pike & Route 352.

7/23/09 INSPECTION: annual: 1301 Wright's Lane, Harvey's Insurance.

7/23/09 COMPLAINT: burning: 18 Reservior Road: Tim Alligonis, burning construction debris: fire company extinguished it.

7/28/09 INSPECTION: Goshen Fair Grounds.

7/28/09 AUTOMATIC FIRE ALARM: 308 Devon Way, Hershey's Mill: Mary Martin.

7/29/09 AUTOMATIC FIRE ALARM: 727 Inverness Drive, Hershey's Mill: Robert O' Conner.

7/29/09 FIRE DRILL: 1354 Boot Road; Comcast.

7/29/09 AUTOMATIC FIRE ALARM: 773 Inverness Drive, Hershey's Mill: O'Ryan.

Ralph F. Brown
Fire Marshal
Ralph Brown

3 of 8

Goshen Fire Company

Fire Police Year-to-Date Statistics
for
2009

Report Created
8/3/2009 21:05

Category JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOT
Calls 37 47 61 39 62 54 53 353
Hours in Service 81 138 136 157 194 242 469 1417
Calls 2 Hours or Longer 2 4 3 3 5 8 8 33
NATURE
Amb Assist 3 6 5 3 4 5 26
Appliance Malfunction 1 1 1 1 1 1 6
Assist PD 2 3 2 7
Automatic Alarms 2 2 7 2 13 16 10 52
Brush 2 2 1 2 3 1 11
Building 2 1 1 1 5
CO Detector Activation 1 2 3 4 10
Dwelling 1 3 3 1 1 1 10
Fire 3 2 1 2 8
Fire Type Unknown 1 1 2
Forcible Entry 1 1
Fuel Spill 1 1 2 2 1 1 8
Gas Leak 1 1 5 1 1 1 10
Mutual Aid 1 1 1 1 4
Mutual Aid to East Whiteland 2 1 3 6
Mutual Aid To Malvern 1 2 1 1 3 8
Mutual Aid To West Chester 3 4 2 4 2 1 16
Mutual Aid to West Whiteland 1 1 2
MVA 16 14 18 17 18 6 12 101
Odor Investigation 1 2 2 1 4 1 5 16
Ped Struck 1 1 1 3
Rescue 1 1 2
Search 1 1
Smoke in Building 1 1
Special Duty 4 8 12
Transformer 1 1 1 3
Trash 1 1 1 1 4
Trees & Wires 3 2 2 7
Vehicle Fire 1 2 1 4 1 2 11
TASKS
A - Closed Road 11 11 18 13 14 21 14 102
B - Ran with Single Lane 8 8 14 7 11 8 9 65
C - Used Cones 14 18 20 14 20 24 19 129
D - Needed Crowd Control 3 4 4 4 7 4 4 30
F - Used Flares 8 2 8 2 6 7 6 39
G - Recall 8 6 8 7 13 2 6 50
H - Closed Turn Lane 5 5 10 9 8 5 4 46
I - Blocked Access 20 25 26 20 31 31 22 175
J - Be Prepared to Stop Sign 3 1 4
K - Used Strobes 1 1
L - Emerg. Scene Ahead Sign 2 1 3
M - Cone Signs 2 1 3 3 1 5 1 16

Page 1

4 of 8

Goshen Fire Company

Category JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOT
N - NightScan on Traf54 4 2 4 5 15
O - No Services Required 5 8 5 11 10 6 13 58
P - LED Arrow Sign 5 3 3 6 4 2 1 24
MUNICIPALITIES
East Goshen 12 22 20 13 24 17 25 133
East Whiteland 2 1 7 10
Edgemont 1 1
Malvern 1 1
Other 1 1
Thornbury (Chesco) 1 1
West Chester 3 2 1 4 2 12
West Goshen 14 14 20 13 20 14 21 116
West Whiteland 1 2 1 4
Westtown 6 2 12 3 11 6 4 44
Willistown 2 4 5 7 2 7 3 30
Crew
Abel, Bill 7 11 10 2 5 6 11 52
DeBello, Tony 4 4 1 14 23
Grothmann, Jason 9 1 17 4 5 1 13 50
Guarino, Rich 4 3 1 3 9 20
Harlan, Bruce 1 2 4 6 2 2 1 18
Heist, Stan 1 7 12 18 15 31 84
Herman, Ralph 11 22 28 19 14 12 19 125
Herr, Vickie 2 9 14 10 2 2 2 41
Jackson, Greg 9 11 14 9 19 14 19 95
Jorgensen, Robert 3 14 6 13 36
Keslick, Bill 5 3 7 7 8 2 32
Keslick, Nancy 1 2 1 4
Manley, John 16 15 21 11 24 17 20 124
Molnar, David 18 27 38 26 41 20 27 197
Myers, Charlie 23 22 24 24 31 18 21 163
Pentek, Alex 1 1 2 2 6
Rennard, Steve 1 1 1 7 10
Salas, Phil 7 7 3 3 7 4 13 44
Sherbourne, Scott 3 2 2 3 6 1 9 26
Smith, Jack 28 37 35 25 39 40 42 246
Smith, Sue 1 1 2
Verno, Ralph 14 23 22 17 25 15 27 143
Wentzel, Jill 2 5 1 1 5 3 9 26
Crew Totals 156 206 247 184 273 192 309 1567
Day Calls 27 33 43 30 42 41 46 262
Night Calls 10 14 18 9 20 13 7 91
Traffic 54
Responses 7 5 19 6 11 8 21 77
54 Mileage 54 22 88 39 73 55 87 418
Traffic 56
Responses 2 4 2 1 1 10
56 Mileage 22 13 16 7 5 63

Page 2

5 of 8

Fire Police Statistics
for
Jul, 2009

Report Created
8/3/2009 21:05

Category Count
Calls 53
Hours in Service 469
Calls 2 Hours Or Longer 8
NATURE
Amb Assist 5
Appliance Malfunction 1
Automatic Alarms 10
Building 1
Fire 2
Forcible Entry 1
Fuel Spill 1
Gas Leak 1
Mutual Aid 1
Mutual Aid To West Chester 1
MVA 12
Odor Investigation 5
Special Duty 8
Transformer 1
Trash 1
Vehicle Fire 2
TASKS
A - Closed Road 14
B - Ran with Single Lane 9
C - Used Cones 19
D - Needed Crowd Control 4
F - Used Flares 6
G - Recall 6
H - Closed Turn Lane 4
I - Blocked Access 22
M - Cone Signs 1
N - NightScan on Traf54 5
O - No Services Required 13
P - LED Arrow Sign 1
MUNICIPALITIES
East Goshen 25
West Goshen 21
Westtown 4
Willistown 3
CALL SUMMARY
Day Calls 46
Night Calls 7
Crew
Abel, Bill 11
DeBello, Tony 14
Grothmann, Jason 13
Guarino, Rich 9
Harlan, Bruce 1
Heist, Stan 31
Herman, Ralph 19
Herr, Vickie 2
Jackson, Greg 19
Jorgensen, Robert 13
Keslick, Bill 2
Manley, John 20
Molnar, David 27
Myers, Charlie 21
Rennard, Steve 7
Salas, Phil 13
Sherbourne, Scott 9
Smith, Jack 42
Verno, Ralph 27
Wentzel, Jill 9
Total Crew Responding 309
Traffic 54
Responded 21
Miles Traveled 87
Traffic 56
Responded 1
Miles Traveled 5

6 of 8

2009 EMS Year to Date Statistics

Category JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOT
Calls 316 254 242 224 261 222 231 1750
Career Only Crews (62%) 193 160 148 136 150 141 164 1092
Blended Crews (4%) 20 4 13 4 8 11 2 62
Volunteer Only Crews (34%) 103 90 81 84 103 70 65 596
Calls To:
Bellingham 41 35 27 24 34 19 23 203
Hershey Mill 20 24 26 31 33 25 29 188
Ice Line 2 4 1 2 1 10
Pembrooke 12 7 7 7 6 8 8 55
Wellington 34 24 33 12 19 21 17 160
YMCA 6 2 1 5 1 4 19
Type Calls
Assault 4 1 1 6
Bites 1 1
Drug Poisoning 2 1 1 1 5
Fall 43 23 26 24 21 26 29 192
Lightning 1 1
Machinery Accidents 1 1 2
Medical 154 141 125 110 130 98 108 866
Motor Vehicle Non-traffic Accide 3 2 2 7
Motor Vehicle Traffic Accident 9 7 12 6 6 4 4 48

7 of 8

Category Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Motorcycle Accident 1 1
Not Known 1 1
Other 9 8 9 8 2 7 5 48
Other Trauma 3 1 4
Pedestrian Traffic Accident 1 1 2
Recreation Vehicle 1 1
Sports Injury 1 1 1 2 1 6
Stabbing/Cutting Accidental 1 1
Stabbing/Cutting Assault 1 1
Transport 1 1
Venomous Sting (Plants, Animals) 2 2
Patients Treated 232 179 178 153 164 138 152 1196
Patients 65 and Over (65%) 147 113 122 93 116 90 101 782

Patients Treated by ALS Units

ALS Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
CCH Medic 91 80 73 55 65 61 45 57 436
Malvern Medic 4 37 26 45 22 33 21 24 208
Medic 23 1 1 2
RMH Medic 104 1 1

Township Statistics

Township Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Downingtown Borough 1 1
East Bradford Township 1 1
East Goshen Township 192 146 147 130 148 124 128 1014
Edgemont Township 3 2 1 6
Malvern Borough 1 1
Newtown Township (Delaware) 2 2
Philadelphia City 1 1
West Chester Borough 2 2
West Goshen Township 76 73 59 56 70 66 71 471
Westtown Township 36 24 26 27 24 19 19 175
Willistown Township 9 11 8 10 15 11 11 75
Number of Patients Transported
Brandywine Hospital 1 1 1 3
Bryn Mawr Hospital 4 2 2 2 4 2 16
Bryn Mawr Rehab Hosp 1 1
Chester County Hospital 128 113 101 98 98 89 94 721
Crozer-Chester Medical Ce 8 1 3 5 4 1 22
Hospital of the Univ of P 2 2
Lankenau Hospital 1 1
Paoli Memorial Hospital 85 56 66 44 57 47 52 407
PENNSTAR 2 2
Phoenixville Hospital 1 1
Riddle Memorial Hospital 5 4 4 2 1 1 3 20
Calls from 6AM to 5PM ( 59%) 190 150 142 123 153 142 138 1038
Calls from 5PM through 11PM ( 81 55 63 66 64 50 63 442
Calls from 11PM to 6AM (Night Crew) (16%) 45 49 37 35 44 30 30 270

89B

10 CORRESPONDENCE
B.
1pg

SITE ENGINEERING CONCEPTS, LLC

Consulting Engineering and Land Development Services

10 August 2009

Rick Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RECEIVED
BY:
AUG 1 1 2009

Re: Notification for NPDES Permit Application
Matthew J. & Christine Mullen
East Goshen Township, Chester County

Dear Mr. Smith:

The purpose of this municipal notice is to inform you that Matthew J. & Christine Mullen will be applying for the following permit coverage(s) from the Pennsylvania Department of Environmental Protection (DEP):

Permit Application Type(s): Individual NPDES
Applicant Contact: Site Engineering Concepts, LLC, Attn: Rob Lambert
Project Location: 1645 East Strasburg Road
Project Description: Home, related improvements and barn

Acts 67, 68 and 127 of 2000, which amended the Municipalities Planning Code (MPC) to direct state agencies to consider comprehensive plans and zoning ordinances when reviewing applications for permitting of facilities or infrastructure, and specify that state agencies may rely upon comprehensive plans and zoning ordinances under certain conditions as described in Sections 619.2 and 1105 of the MPC.

Enclosed is a copy of the General Information Form (GIF) completed by the applicant for this project. DEP invites you to review the attached application and comment on the accuracy of answers provided with regard to land use aspects of this project; please be specific to DEP and focus on relationship to zoning ordinances. If you wish to submit comments to DEP to become part of a land use review of this project, you must respond within 30 days to the DEP Southeast Regional Office. If there are no land use comments received by the end of the comment period, DEP will assume that there are no substantive land use conflicts and proceed with the normal application review process.

Should you have any questions or comments, please feel free to contact me.

Sincerely,

Robert M. Lambert, P.E.

P.O. Box 1992; Southeastern, PA 19399
P: 610.240.0450 F: 610.240.0451

10. CORRESPONDENCE
C.
1pg

John F. Strasser
Franchise Manager
Verizon Video

Verizon Communications Inc.
901 Tatnall St.
Wilmington, DE 18901
302-576-8176
john.f.strasser@one.verizon.com

July 29, 2009

Dear Municipal Official:

This is to inform you of a rate change for Verizon’s FiOS TV Premier Service as described in the attached customer notices. The customer notices will be sent by First Class mail and will provide affected subscribers with a notice of the rate change. Letter A provides notice of an increase from $42.99 to $52.99 to customers who began subscribing to FiOS TV Premier on a “stand-alone” basis in 2007 when the rate was $42.99. Letter B provides notice of an increase from $47.99 to $57.99 for those customers who began subscribing to FiOS TV Premier on a stand-alone basis in 2008 when the rate was $47.99. Letters C and D provide notice of these rate changes to subscribers who have opted out of receiving marketing-related postal mailings from Verizon.

We realize that our customers have other alternatives for entertainment and our goal is to offer the best choice and value in the industry. Verizon appreciates the opportunity to conduct business in your community. Should you or your staff have any questions, please contact me at (302) 576-8176 or email john.f.strasser@verizon.com.

Sincerely,

John F. Strasser
Franchise Manager
Verizon Video

WORKSHOP

BOARD OF SUPERVISORS MEETING

WORKSHOP

Tuesday
August 18, 2009
7:00 PM

  1. Review meeting agenda
  2. Review invoices – none
  3. Action List Verbal update on meter billing; Sullivan’s Grove update; No Swimming signage; Set date for meetings w/visiting nurses and Malvern Library.; Staff recommendation regarding Township Newsletter
  4. Any Other Matter
  5. Liaison Reports
  6. Subdivisions/Land Developments/ZHB Applications
  7. Public Comment
  8. FYI

Reminder –

NEWSLETTER ARTICLE SUBMISSION DUE DATES: DELIVERY DATE:
August 12, 2009 October 1, 2009
November 10, 2009 January 1, 2010

WORKSHOP
3.
E
1pg

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

MEMO

TO: Board of Supervisors

FROM: Diane Degnan, Office Manager

RE: Township Newsletter

DATE: August 13, 2009

As requested, the following is the Administration Department’s recommendation with regard to the frequency of the Township Newsletter.

If it is the Board’s intent is to eventually do away with hard copies of the newsletter, and rather to provide information via the Township website, I would suggest reducing the frequency from four to two per year (spring and fall). This would reduce the cost, and also relieve some of the burden on the ABC Chairs who have to compile their information. As the newsletters are sent out quarterly, one edition is no sooner mailed, and we are requesting information for the next. With the exception of spring and fall, ABC Chairs would then be able to submit their information in a manner more timely to the events for each ABC.

It should be noted that Joanne has taken an informal survey of residents coming into the building, and has received nothing but positive feedback with regard to the newsletter. Most consider it their prime source of township information.

While many of our residents have computer access, there are still some who do not, and they rely on the copies they receive in the mail for information. For that reason, I don't think it would be appropriate to completely eliminate hard copies at this time.

dld
cc: Joe Gill

F:\Data\Shared Data\Admin Dept\Newsletter\memo\080409memotobosrenewsketterfrequency.doc

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: August 14, 2009
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Hershey Mill Dam

Notice- The notification letter was sent to ~150 property owners within 1,000 feet of the dam and posted on the Township Web Page.

DEP – DEP inspected the dam on July 9, 2009 and noted that the dam is in overall poor condition.

Options – Three options were initially identified and costed out. Gannet Fleming was asked to re-estimate costs the concrete spillway and the articulated concrete block spillway options

A meeting was held at the dam on August 6, 2009 and two additional alternatives were identified. The first would require the construction of a “new” dam above the existing dam. The other would involve lowering the existing spillway and a portion of the dam by 6 feet. This would change the dam’s classification to C-3 and nothing further would have to be done to the dam.

Costs -

Option Cost
Concrete spillway $372,000
Articulated concrete block spillway $351,000
Breach $250,000
Secondary concrete dam $1,566,000
Lower spillway and dam by 6 feet $265,700

Funding – We have not been able to find any funding for the any of the “repair” options. NRCS will fully fund the breaching of the dam and restoration of the floodplain.

NRCS Deadline- NRCS has advised that the agreement must be finalized by September 4, 2009 in order to meet the completion date of October 1, 2010.

Agreement for the Purchase of Conservation Easement - The Township Solicitor has reviewed it and while it may need some “word smiting” there are no deal breakers in the agreement.

Restoration of the floodplain – Since NRCS has not yet hired an engineer they do not have a specific plan for this project. They have provided us with some standards. NRCS will be required

to obtain a soil and erosion permit from the Conservation District for this project so all disturbed areas and the “silt” that is going to remain in place must be stabilized to prevent erosion.

DeRiemer Option – Neil DeRiemer’s proposal to construct two 45-feet wide secondary spillways that utilized Turf Reinforcement Mat as a cost savings measure was reviewed by DEP. The Turf Mat was determined not to be acceptable by DEP.

Sale of the Dam – Neil DeRiemer as made an offer to purchase the dam from the property subject to a number of conditions. I have sent the offer to the Township Solicitor but I would note that under the Second Class Township Code real property can only be sold via the bidding process.

Resident Feedback – Savethedam.org distributed a fact sheet and flyer to some number of homes. As of 1:30 PM Friday the Township has received approximately 12 e-mails and 14 phone calls from people who want the Board to reject the federal money and save the dam. One person was undecided and another suggested lowering and widening the existing spillway as an alternative.

If you want to proceed with accepting the NRCS proposal I would suggest the following motion.

“I move that we authorize the Township Manager to execute the Agreement for the Purchase of Conservation Easement with the condition that the Township Solicitor approves the final wording of the agreement and that we request that NRCS not commence any work until September 4th.”

If you don not want to accept the NRCS offer I would suggest the following motion.

“I move that we authorize the Township Manager to send a letter to NRCS advising them of the Board’s decision not to proceed with the project.”

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\NRCS\Memo to BoS.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

July 23, 2009

Dear Resident:

The Pennsylvania Department of Environmental Protection has advised the Township that the Hershey Mill Dam, located at Greenhill Road and Hershey Mill Road, does not meet their current requirements. Their concern is that during a major rainfall event the dam could overtop and possibly fail.

The Township Engineer has developed and estimated the cost for three alternatives to correct this condition. Two of them involve the creation of a secondary spillway that would allow the water to safely pass the dam and the third alternative is breaching the dam. The following is a summary of each alternative.

Alternative 1 would require the construction of secondary concrete spillway that would extend eastward from the current spillway for distance of 200 feet. The cost for this option was estimated at $260,000.

Alternative 2 would require the installation of construction of an articulated concrete block secondary spillway that would extend eastward from the current spillway for distance of 200 feet. The articulated concrete blocks would be connected with cables to prevent them from moving when the secondary spillway was in use. The open areas of the blocks would be filled with dirt and seeded. After the grass becomes fully established the blocks would no longer be visible. The cost for this option was estimated to be $280,000.

As of this date the Township has not been able to locate any grant or funding for either of the spillway alternatives.

Alternative 3 would involve breeching the dam and re-establishing the stream channels above the dam. The entire dam would not be removed and the breech would be done in such a manner as to make it look like the dam had failed. While the trees and shrubs in the immediate area of the breech would be removed, those further away from the breech would remain. The cost for this option was estimated to be $145,000.

In June of this year the Township was notified that it had been awarded a grant from the U.S. Department of Agriculture, Natural Conservation Resource Service (NRCS) thru their Emergency Watershed Protection- Floodplain Easement program. The NRCS grant would provide all of the funding for the engineering, permitting, and other work necessary to breach the dam and restore the floodplain above the dam to its natural state. There would be no cost to the Township.

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

Unfortunately under this program funds are not able to be spent on upgrading or the rehabilitation of a dam. The intent of the program is to return floodplain areas to their natural form and function.

The following is an excerpt from the NRCS Emergency Watershed Protection - Floodplain Easement webpage that outlines the purpose of the program.

Restoration of the Floodplain
The easement provides NRCS with the authority to fully restore and enhance the floodplain’s functions and values to natural conditions to the greatest extent practicable. NRCS may pay up to 100 percent of the restoration costs. NRCS actively restores the natural features and characteristics of the floodplain through re-creating the topographic diversity, increasing the duration of inundation and saturation, and providing for the re-establishment of native vegetation.

The NRCS grant is funded by the America Recovery and Reinvestment Act of 2009 and the construction must be completed by October 1, 2010. In order to meet this deadline the Board of Supervisors must make the decision on whether or not to accept the NRCS grant at their meeting on August 18, 2009.

In accordance with Township policy this letter is being sent to all property owners within 1,000 feet of the Hershey Mill Dam to let you know this matter will be on the agenda for the Board of Supervisors formal meeting on August 18, 2009 at 8:00 pm the Township Building.

There is information on the Hershey Mill Dam at the “For Your Information” section of Township Web Page (www.eastgoshen.org). Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Louis F. Smith, Jr.
Township Manager

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Options\1,000 fot letter 072309.doc

3140-FM-WE0001 Rev. 3/2008

COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF WATERWAYS ENGINEERING
DIVISION OF DAM SAFETY

DEP Data Records Inspection Record #
Complaint Record # 1812295
Enforcement Record #

DAM SAFETY INSPECTION NOTICE

Field Value Field Value
DEP Office Dam Safety Central Office Phone 717 7878568
Address P.O. Box 8554 Harrisburg, PA 17105 Dam Permit or ID. # D15-125
Owner or Permittee East Goshen Township Dam or Project Name Hershey Mill Dam
Complete Mailing Address c/o Louis F. Smith, Jr.
1580 Paoli Pike
West Chester, PA 19380
County Chester
Municipality East Goshen Twp Take GPS readings at the center of the crest of the dam.
Latitude: 40° 00' 47" N
Longitude: 75° 33' 26" W

Type of Inspection: [ ] ADMIN - Administrative / File Review, [ ] CEI - Compliance Evaluation, [ ] COMPL - Complaint Inspection, [ ] CONST - Construction Progress, [ ] DAM12 - Category 1 or 2 dam, [ ] DAM3 - Category 3 dam, [X] FUI - Follow-up Inspection, [ ] INCDT - Incident response, [ ] OTHER

Location / Appurtenance Condition: Insp. Condition: OK Condition: Concern Comment / Explain Concern Violation? Check if yes Cite 25 Pa. Code
Crest [X] [ ] [X] Uneven, narrow, thick vegetation / roots [ ]
Upstream Face [X] [ ] [X] Uneven, thick vegetation [ ]
Downstream Face [X] [ ] [X] large trees, thick vegetation, evidence of overtopping [ ]
Outlet Structure [ ] [ ] [ ] [ ]
Outlet Conduit [ ] [ ] [ ] [ ]
Primary Spillway [X] [X] [ ] [ ]
Emergency Spillway [ ] [ ] [ ] [ ]
Spillway Channels [X] [X] [ ] [ ]
Downstream Toe Area [ ] [ ] [ ] [ ]
Encroachments [ ] [ ] [ ] [ ]
Site Restoration [ ] [ ] [ ] [ ]
E & S Plan on Site [ ] [ ] [ ] [ ]
E & S Controls [ ] [ ] [ ] [ ]

Inspection Results Code: [ ] DVN (De Minimus Violation), [ ] NOVIO (No significant violations noted), [ ] OUTST (Outstanding violations, notice req'd), [ ] RECUR (Recurring violations), [X] REPAR (Repairs or upgrade required), [ ] VIOIC (Viols noted and immediately corrected), [ ] VIOLS (Violation(s) noted), [ ] VOV (New and outstanding violations Noted), [ ] VRV (New and recurring violations noted)

Violations Noted? [ ] Yes [X] No
Field Notice of Violation? [ ] Yes [X] No
Compliance Order? [ ] Yes [X] No

Remarks: This report is a summary of the undersigned DEP representative's visual inspection only on this date, not an in-depth investigation of the dam's present condition or compliance history. The inspector's full report is available by contacting the DEP office noted above.

This dam is in overall poor condition. Large trees have roots that pass through embankment to pool level. In area of inground swimming, embankment appears to have been modified to slope was over-steepened.
Dam requires a complete rehabilitation.

DEP Inspector was accompanied by: [ ] Owner, [ ] Permittee, [ ] Engineer for Owner or Permittee, [X] Other: Curtis Brown, Ron Riesen

DEP Rep: (signature) Richard Reisinger
(print name) Richard Reisinger
Phone: 717 772 5957
Date: 7/9/09
Time: 12:00

[X] White – Owner, Permittee, or Representative
[X] Yellow – Division of Dam Safety, Central Office
[X] Pink – DEP Regional File SERO

Hershey Mill Dam Cost Estimates 14-Aug-09
Engineer & Date of Estimate Description Breech Articulated Concrete Block Concrete Spillway Lower spillway Dam behind the Dam
Yerkes
4/8/08

Lower Spillway and Dam behind Dam 8/14/09
Engineering $29,876 $39,314 $39,314 $33,000 $95,000
Construction $114,906 $241,181 $220,293 $232,700 $1,476,000
Total $144,782 $280,495 $259,607 $265,700 $1,566,000
Grants $0 $0 $0 $0 $0
Net Project Cost $144,782 $280,495 $259,607 $265,700 $1,566,000
URS 12/2/08 Engineering 36450
Construction $ 60,000 to $ 100,000 Yerkes cost are 20 30% to low Yerkes cost are 20 30% to low
Sub Total $ 96,450 to $ 136,450
Contingency (15%) $ 15,000 to $ 20,000
Total $ 111,450 to $ 156,450 $223,594 to 364,644 $311,528 to $337,482
Grants $120,000 0 0
Net Project Cost $ 0 to $ 36,450 $223,594 to 364,644 $311,528 to $337,482
Rettew
9/17/08
Engineering $37,000 to $40,000
Demo/Construction $170,000
As built Drawing $11,000
Total $218,000
Grants $100,000
Net Project Cost $118,000
Gannet Flemming
8/14/09
Engineering $21,000 $22,000
Construction $330,000 $350,000
Total $351,000 $372,000
Avail Grants $0 $0
Net Project Cost $351,000 $372,000
NRCS
4/2/09
Engineering
Construction
Total $200,000 to $250,000
Avail Grants $200,000 to $250,000
Net Project Cost $0

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Options\Comparisons 081409.xls

GANNETT FLEMING, INC.
P.O. Box 80794
Valley Forge, PA 19484-0794

Location:
Valley Forge Corporate Center
1010 Adams Avenue
Audubon, PA 19403-2402

Office: (610) 650-8101
Fax: (610) 650-8190
www.gannettfleming.com

Gannett Fleming

August 14, 2009

Mr. Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Hershey’s Mill Dam Restoration – Engineer’s Opinion of Probable Project Cost

Dear Mr. Smith:

Attached please find Gannett Fleming’s report “Engineer's Opinion of Probable Project Cost” for the prospective Hershey’s Mill Dam Restoration Options 1 and 2, including engineering and construction costs. Information for Options 1 and 2 was transmitted to Gannett Fleming by email dated July 17, 2009. Option 1 provides for a secondary spillway consisting of concrete wall and slab construction; Option 2 also provides for a secondary spillway consisting of a cable concrete system. The costs are summarized below.

Summary of Engineer’s Opinion of Probable Project Cost

Engineer’s Opinion Option 1
Concrete Wall and Slab
Option 2
Cable Concrete System
Probable Construction Cost $347,700 $327,400
Probable Construction Cost for Budgeting $350,000 $330,000
Probable Engineering Services Cost $21,900 $20,600
Probable Engineering Services Cost for Budgeting $22,000 $21,000
Probable Total Project Cost for Budgeting $372,000 $351,000

This letter and report are provided solely for East Goshen Township internal information and budgeting purposes. Gannett Fleming makes no representations or guarantee that the costs included herein will accurately predict prospective contractors’ actual bid. Presuming that one option is selected for implementation, actual bids submitted may be higher or lower than the estimate herein as a result of variations in material, equipment and construction costs; construction methods; market conditions; competitive bidding and other factors.

Our “opinion” of probable project cost for each option reflects a level of accuracy based on the preliminary nature the designs (prepared by others), estimating quantities from available drawings, accounting for variables inherent in the estimating/bidding process, and our experience with similar projects.

A Tradition of Excellence

Mr. Rick Smith | Page 2 | August 14, 2009

We appreciate this opportunity to provide engineering services to East Goshen Township. Please do not hesitate to call the undersigned at 610-650-8101, ext 7126, if you have any questions.

Very truly yours,

GANNETT FLEMING, INC.
RICHARD E. HORVATH, P.E.
Project Manager

REH/rh

c. File

Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 1 of 7 044224.024 REH 8/14/2009

Report, Engineer's Opinion of Probable Project Cost

Hershey’s Mill Dam (D15-125) Existing Conditions

Top of Dam (wall) = 449.0 (datum unknown)
Length of Dam = approximately 315 feet
Spillway Crest = 446.78 (freeboard = 2.22 feet)
Existing Spillway Length = 22 feet
Drainage Area = 1,152 ac. = 1.8 sq mi
Maximum Height = 14 feet
Drawdown System = 18-inch diameter pipe (reported to be operational)

Option 1 – New Secondary Concrete Spillway 0.97 feet higher (Elev. 447.75) than existing spillway (estimated cost by others = $259,607)

Option 2 – New Secondary Cable Concrete System Spillway 0.97 feet higher (Elev. 447.75) than existing spillway (estimated cost by others = $280,495)

Sheets for Options 1 and 2 are attached.

The Engineer’s Opinion of Probable Project Cost is prepared solely for the benefit of the East Goshen Township, and no other parties may rely upon the estimates for any reason. Nothing contained herein shall confer any rights upon or create any duties on the part of Gannett Fleming toward any third party. Gannett Fleming further advises that preparation of estimates herein does not endorse design adequacy of either option and that the estimates include construction items identified on the drawings and other work considered appropriate for construction (i.e. erosion and sediment control). It is further noted that foundation information is not available and that the information provided on the drawings does not appear to be final design.

Notes

  1. Cost estimate preparation does not verify adequacy of design.
  2. No foundation information available.
  3. Some proposed feature dimensions not indicated; dimensions scaled from drawings.
  4. Review of information included on drawings prepared for Options 1 and 2 indicates “raise top of dam to elevation 450.00’ & line w/turf reinforcement matting” and “raise top of wall to elevation 450.00’ & line w/turf reinforcement matting”; on the east and west sides of the improvement. Information to develop quantities for these improvements is limited. The cross-section for raising the embankment is assumed (for quantity estimate) to be a trapezoid 15 ft wide by 3 ft high (for over-excavation/foundation preparation) and 2h:1v side slopes.

East Goshen Township

Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 2 of 7 044224.024 REH 8/14/2009

ESTIMATED QUANTITIES - OPTION 1

  1. Mobilization and Demobilization: By percent
  2. Dewatering: Partial or full drawdown of impoundment will be required
  3. Control of Water: By percent
  4. Erosion and Sediment Control: By percent
  5. Demolition: Demolish existing masonry wall, wall is approximately 3 ft wide by 8 ft (446-438) high x 200 ft; volume is 177.8 cy (use 180 cy)
  6. Excavation: Stripping in improvement area is not considered advantageous to Project, include stripping volume in excavation volume, do not separate. Contractor is responsible for excavation safety and may decide to sheet/shore or construct more moderate side slopes. Pay limits for estimate are 1 foot outside of footing width and 1h:1v. Volume = (8.25 + 25)/2 x 14 x 200/27 – masonry wall demolition = 1,724 – 180 = 1,544 (use 1,550 cy) Add excavation for swale (Item 13) = 420 cy Total excavation volume = 1,550 + 420 = 1,970 cy
  7. Four-Inch Perf VC Pipe – No spacing given: Assume 10 ft ctrs. Number = 200/10 = 20 Assume each drain is 3 ft long
  8. Reinforced Concrete: Concrete for wall: footing is 6.25 (1.5 + 1 + 3.75) ft by 1 ft, bottom Elev of ftg is 434.25, Stem is 1 ft Volume of wall = 140 cy
  9. Slab on Grade: Area = 200 ft x 33.3 ft = 6,660 sf Forms are per 100 sf of area = 66.6 SFCA, use 70 SFCA Reinforcement: Assume 5 lbs/cf, wt = 5 x 6,660 x 15/12 = 2,756 lbs = 1.38 tons use 1.5 tons
  10. Nonwoven Geotextile: Area is approximately 13 ft x 200ft/9 = 96 sy, say 100 sy), increase by 20 percent for overlap, use 120 sy
  11. No. 57 Coarse Aggregate: Volume is approximately 1 ft x 11.5 x 200/27 = 85 cy (use 90 cy).
  12. Stone Veneer: Area = 10.5 ft x 200 ft/9 = 233 sf (use 240 sf)

East Goshen Township

Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 3 of 7 044224.024 REH 8/14/2009
  1. Compacted Fill: Volume = Volume is approximately (5 + 17)/2 x 12.5 x 200/27 = 1,018 cy (use 1,020 cy)
  2. Excavation for Swale: No dimensions given, assume bottom width = 10 ft, average 4 ft deep and 1h:1v side slopes. Area = 4 x (10+18)/2 = 56 sf, volume = 56 x 200/27 = 415 cy (use 420 cy) Mirifi HP570 Geotechnical Liner for Swale (10 + 2 x 5.6 + 8) x 200/9 = 648 sy, say 650 sy, increase by 20 percent for overlap, use 780 sy)
  3. Riprap (R-7): Use volume for swale excavation = 420 cy
  4. Modified Stone Placement (4-inch base for top slab): Volume = 4/12 x 33 x 200/27 = 81 cy, use 90 cy.
  5. Raise Masonry Wall, west side of dam: Area = 1 ft high x 100 ft long = 100 sf
  6. Large Tree Removal = use 4 each
  7. Excavation/Foundation Preparation, east side of dam: Volume = 2 ft x 15 ft x 90/27 = 100 cy
  8. Raise Embankment, east side of dam: Volume = 48 sf x 90/27 = 160 cy
  9. Turf Reinf Matting (limits not defined on drawings) = say 200 ft x 50 ft/9 = 1,111 sy, use 1,200 sy
  10. Site Restoration

East Goshen Township

Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 4 of 7 044224.024 REH 8/14/2009

ESTIMATED QUANTITIES - OPTION 2

  1. Mobilization and Demobilization: By percent
  2. Dewatering: Partial or full drawdown of impoundment will be required
  3. Control of Water: By percent
  4. Erosion and Sediment Control: By percent
  5. Masonry wall demolition = 0.88 x 16 x 200/27 = 104.3 cy (use 110 cy) Stripping: Stripping - include in excavation volume
  6. Excavation: Area by polar planimeter (= 2.44 sq in x 16 sf/sq in = 39 sf. Volume = 39 x 200/27 = 288.9 use 290 cy
  7. Compacted Fill (adjacent to existing masonry wall): 2.5 x 5.5 x 0.5 x 200/27 = 50.9 cy, use 50 cy
  8. Woven Geotextile Surface area = 60 ft x 200 ft = 12,000 sf. Note woven geotextile is continuous beneath cable concrete system. Area is the same but increase by 20 percent for overlap, use 14,400 sy.
  9. Cable Concrete System: Surface area = 60 ft x 200 ft = 12,000 sf. Note typical CCS includes coarse aggregate base and cutoff. These are not shown on Option 2 section and have not been included in the cost estimate.
  10. Ground Anchors: No layout provided, assume 10 ft ctrs, say 6 x 20 = 120
  11. Raise Masonry Wall, west side of dam: Area = 1 ft high x 100 ft long = 100 sf
  12. Large Tree Removal = use 4 each
  13. Excavation/Foundation Preparation, east side of dam: Volume = 2 ft x 15 ft x 90/27 = 100 cy
  14. Raise Embankment, east side of dam: Volume = 48 sf x 90/27 = 160 cy
  15. Turf Reinf Matting (limits not defined on drawings) = say 200 ft x 50 ft/9 = 1,111 sy, use 1,200 sy
  16. Site Restoration

East Goshen Township

Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 5 of 7 044224.024 REH 8/14/2009

LUMP SUM OR UNIT PRICES (Information Source: 2009 Means Heavy Construction Cost Data Publication)

Work Description Material/ Equipment Means Page/ID Unit Unit Cost
Reinforced Concrete Wall CIP, 15” thick, 18’ high 64/03 30 53.40 4500 CY $480.00
Reinforced Concrete Slab on Grade CIP, 15” thick, no forms or rebar 64/03 30 53.40 4950 SF $7.15
Forms in Place Edge forms, wood, over 12” high 48/03 11 13.65 3060 SFCA $6.10
Reinforcing in Place Slab on grade, #3 to #7 60/03 21 10.60 0600 Ton $2,650.00
NonWoven Geotextile 120 lb tensile strength, in place 251/31 32 13.30 1550 SY $1.52
Coarse Aggregate In place 275/32 11 23.23 1512 CY $54.50
Excavation ½ CY Power Shovel, load directly into trucks, two 12 cy dump trucks, 1 mile round trip 428/ G 1030 120 4100 CY $7.62
Cable Concrete System 70T Units. Use $11.20 per sf to include woven geotextile. anchors are $6 per, costs are materials delivered to site, installation extra. SF $15.00
Structural Backfill Borrow, loading and/or spreading, common earth, ½ cy bucket 228/31 23 23.15 4010 BCY $12.80
Backfill/Compaction Sheepsfoot, 12 inch lifts, 2 passes 247/31 23 23.92 5680 ECY $0.37
Masonry Wall Demolition Stone with mortar 24/02 41 13.33 1400 CF $4.75 $128.25/cy
Masonry Wall Demolition Disposal Urban, incl loading and five mile haul to dump 36/02 41 19.19 0400 CY $10.75
Excavation Power shovel ½ cy, load directly into trucks, two 12 cy dump trucks, 1 mile round trip 428/G 1030 120 4100 CY $7.62
Vitrified Clay Pipe Porous wall underdrain std strength, 4 inch diameter, assume 3 ft long (3 x $7.55 = $22.65 per drain installed) 332/33 46 16.20 3000 EA $22.65
Stone Veneer Ashlar masonry, 4 inch +/- 90/04 43 10.05 1000 SF $30.00
Masonry Random stone, to 6 feet high, 1’-6” thick, mortar set, add $6/sf to include bonding surface preparation and anchors 292/32 32 60.10 0600 SF $80.00
Turf Reinf Matting Nylon, 3-dimensional geomatrix, 9 mil thick 249/31 25 13.10 0060 SY $7.50
Large Tree Removal Aerial lift truck, 48 inch diameter 209/31 11 10.10 7280 EA $1,500.00
Clear and Grub Trees to 12 inch diam, grub stumps and remove 209/31 11 10.10 0200 and 0250 AC $8,975.00
Exca/Found Prep Excavation, Bulk, Dozer, 150 ft haul, clay 222/31 23 16.46 2240 BCY $9.05
Embk Fill Gannett Fleming Sources CY $15.00
Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 6 of 7 044224.024 REH 8/14/2009

Engineer's Opinion of Probable Project Cost - OPTION 1

Item Description. Unit Quantity Cost or Percent Total
1. M and D Job LS 10.0% $24,394.22
2. Dewatering Job LS 1.0% $2,439.42
3. Control of Water Job LS 0.5% $1,219.71
4. E and S Control Job LS 2.5% $6,098.56
5. Masonry Wall Demo CY 180 $139.00 $25,020.00
6. Excavation/Found CY 1,970 $7.62 $15,011.40
7. VC Pipe EA 20 $22.65 $453.00
8. CIP Concete Wall CY 140 $480.00 $67,200.00
9a. CIP Concete Slab SF 6,660 $7.15 $47,619.00
9b. Reinforcement, Slab Tons 1.5 $2,650.00 $3,975.00
9c. Forms, Slab SFCA 70 $6.10 $427.00
10. Nonwoven Geotextile SY 120 $1.52 $182.40
11. No. 57 CA CY 90 $54.50 $4,905.00
12. Stone Veneer SF 240 $30.00 $7,200.00
13. Compacted Fill CY 1,020 $13.17 $13,433.40
14. Geotechnical Liner SY 780 $2.70 $2,106.00
15. Riprap CY 420 $60.00 $25,200.00
16. 2A Modified CY 90 $54.50 $4,905.00
17. Raise Masonry Wall SF 100 $80.00 $8,000.00
18. Large Tree Removal EA 4 $1,500.00 $6,000.00
19. Exca/Found Prep/East Side, CY 100 $9.05 $905.00
20. Raise Embk/East Side CY 160 $15.00 $2,400.00
21. Turf Reinf Matting SY 1,200 $7.50 $9,000.00
22. Site Restoration Job LS 3.0% $7,318.27
Total: Items 1 -22 $285,412.37
Project Overhead/Profit (10%) $28,541.24
Contingency (5%) $14,270.62
Location Correction $19,408.04
Engineer's Opinion of Probable Construction Cost $347,632.27
Engineer's Opinion of Probable Construction Cost (for budgeting) $350,000.00
Engineering Design $7,135.31
Prepare Contract Documents, Drawings and Technical Specifications $3,424.95
Prepare Bidding Documents $2,283.30
Prepare Permit Application/Support $2,283.30
Construction Phase Services (Management and Inspection) $5,708.25
Contingency (5%) $1,041.76
Engineer's Opinion of Probable Engineering Services Cost $21,876.86
Engineer's Opinion of Probable Engineering Services Cost (for budgeting) $22,000.00
Engineer's Opinion of Probable Total Project Cost $372,000.00
Organization Subject Sheet Project No. By Date Chkd By Chkd Date
Gannett Fleming ENGINEERS AND PLANNERS East Goshen Township, Hershey’s Mill Dam Restoration D15-125 Sheet 7 of 7 044224.024 REH 8/14/2009

Engineer's Opinion of Probable Project Cost - OPTION 2

Item Description. Unit Quantity Cost or Percent Total
1. M and D Job LS 10.0% $22,974.33
2. Dewatering Job LS 1.0% $2,297.43
3. Control of Water Job LS 0.5% $1,148.72
4. E and S Control Job LS 2.5% $5,743.58
5. Masonry Wall Demo CY 110 $139.00 $15,290.00
6. Excavation/Found CY 290 $7.62 $2,209.80
7. Compacted Fill CY 50 $13.17 $658.50
8. Woven Geotextile SF 14,400 $0.30 $4,320.00
9. Cable Concrete Sys SF 12,000 $15.00 $180,000.00
10. Ground Anchors EA 120 $8.00 $960.00
11. Raise Masonry Wall SF 100 $80.00 $8,000.00
12. Large Tree Removal EA 4 $1,500.00 $6,000.00
13. Exca/Found Prep/East Side, CY 100 $9.05 $905.00
14. Raise Embk/East Side CY 160 $15.00 $2,400.00
15. Turf Reinf Matting SY 1,200 $7.50 $9,000.00
16. Site Restoration Job LS 3.0% $6,892.30
Total: Items 1 -16 $268,799.66
Project Overhead/Profit (10%) $26,879.97
Contingency (5%) $13,439.98
Location Correction $18,278.38
Engineer's Opinion of Probable Construction Cost $327,397.99
Engineer's Opinion of Probable Construction Cost (for budgeting) $330,000.00
Engineering Design $6,719.99
Prepare Contract Documents, Drawings and Technical Specifications $3,225.60
Prepare Bidding Documents $2,150.40
Prepare Permit Application/Support $2,150.40
Construction Phase Services (Management and Inspection) $5,375.99
Contingency (5%) $981.12
Engineer's Opinion of Probable Engineering Services Cost $20,603.49
Engineer's Opinion of Probable Engineering Services Cost (for budgeting) $21,000.00
Engineer's Opinion of Probable Total Project Cost $351,000.00

Pennsylvania Department of Environmental Protection
Rachel Carson State Office Building
P.O. Box 8554
Harrisburg, PA 17105-8554
August 7, 2009

Bureau of Waterways Engineering
717-772-5957

RECEIVED
BY:
AUG 13 2009

Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Meeting Follow-up and Additional Alternatives
Hershey Mill Dam
East Goshen Township, Chester County
DEP File No. D15-125

Dear Mr. Smith:

This letter is intended to serve as a summary of the meeting held at the dam on the morning of August 6, 2009. This meeting was held to discuss the Department's requirements for bringing this dam into compliance, to further discuss the alternatives that were developed by the Township's engineers and to examine the potential for any additional alternatives.

The Department's position concerning the downstream hazard potential of the existing dam and the requirements for it to be rehabilitated, modified, or removed has not changed as a result of this meeting. Due to the location of a public thoroughfare immediately downstream of the dam; the height of the dam; the storage volume of the dam, particularly during a large runoff event; and the potential flood wave that could sweep across this roadway should the dam fail, the Department considers the Hazard Potential Classification of this dam to be Category, 2 Non-High. "Category 2" refers to the potential for damage to private or public property and short duration public inconvenience caused by overtopping and possible damage to the public thoroughfare in the event of a dam failure. "Non-High" refers to the lack of habitable structures located where a failure would directly impact them. However, loss of life could occur if a vehicle was traveling on the public thoroughfare downstream of the dam when the dam fails.

The dam cannot remain in its current condition and requires significant repairs or rehabilitation. We, however, understand and appreciate that this dam is significantly important to the historical background of the community. The Dam Safety and Encroachments Act and the Department's Chapter 105 Regulations do not waive any regulatory requirements for historical structures when public safety is at risk. When it is determined that there may be an impact on historic values, the regulations allow for the Department to consult with the applicant or dam owner for ways to reduce the adverse impact.

During our August 6 meeting, two additional alternatives were identified and discussed that will reduce the adverse impact to the historical structure over the alternatives referenced in our July 20, 2009 letter. Below is a brief description of the two new alternatives:

An Equal Opportunity Employer
www.dep.state.pa.us
Printed on Recycled Paper

Louis F. Smith, Jr., Manager
East Goshen Township

- 2 -

August 7, 2009

  1. A new dam could be constructed just upstream and in direct contact with the existing one. This new dam would most likely be comprised of either a reinforced concrete gravity wall or a composite sheet pile and concrete wall. This wall would then serve as the dam structure and the existing embankment would stay as-is to preserve the historical appearance. It is noted that the existing dam may be washed away when the new dam overtops with water just as it may be washed away in its current condition. Again, for the most part, this alternative would allow the existing dam to remain unchanged and retain its current appearance.
  2. The existing dam could be reduced in height, and thus its storage volume. This reduction in height and storage volume will greatly reduce potential impacts downstream in the event of failure and will allow the Department to reclassify the dam's downstream hazard potential from "C-2, Non-High" to "C-3." As discussed, the top of the dam to the left side (looking downstream) of the spillway for approximately 60 feet, and the invert of the primary spillway would be lowered by about six feet. This alternative would reduce the storage capacity of the impoundment, but it would preserve a portion of the existing embankment to the left of the spillway and the area at the right abutment. Also, this alternative would maintain the waterfall appearance when viewed from downstream, just at a smaller scale. Completion of this alternative would also require an unknown amount of silt and sediment removal and impoundment stabilization. It appears that only two trees will need to be removed to accomplish this alternative.

These two additional alternatives in conjunction with the comments in our July 20, 2009 letter should provide the Township with several alternatives for addressing public safety concerns at this dam. We appreciate the Township's cooperation and look forward to working with you. Should you have any questions concerning this letter or the dam, please contact me at the above number.

Sincerely,

Richard A. Reisinger, P.E.
Chief
Delaware Watershed Section
Division of Dam Safety

cc: Sen. Andrew Dinniman
Rep. Barbara McIlvaine Smith
Albert J. Giannantonio, P.E., P.L.S., Yerkes Associates, Inc.
Richard E. Horvath, P.E., Gannett Fleming, Inc.

Yerkes Associates – August 14, 2009

Hershey's Mill Dam

Design Phase for DEP Option 1 - Concrete Dam Installation

Item Description Cost
1. Core Borings/Geotechnical Testing and Report (Subcontract to David Blackmore & Associates) $6,000.00
2. Additional survey – upslope areas, laydown/work/access areas, additional Site plans $8,500.00
3. Dam design and Construction Sequence $40,000.00
4. Revise Floodplain Study/check results $4,500.00
5. Environmental Impact Analysis (Subcontract to Mellon Biological Services, includes Alternatives Analysis) $3,000.00
6. Dam permit plan preparation, review, approval DEP $25,000.00
7. Erosion and Sedimentation Control Plan (Submit to Chester County Conservation District) $5,000.00
8. NPDES Permit (PAG 2) Application/review fees $3,000.00
Design Phase Subtotal $95,000.00

Note: An important part of the dam design and construction sequencing will be to devise an effective method to impound and release the accumulating water from the stream channel and reservoir basin during construction. Whether the dam can be constructed in one phase or two will largely depend upon the existing drain inlet's elevation/depth and proximity to the existing and planned dam structures, the adequacy of size and capacity for final operation purposes, and the feasibility of extending or relocating this inlet if it is not behind the new dam's location. Should a replacement, expanded, or alternate release route(s) be needed, then the additional penetration(s) through the existing dam will also need to be incorporated into the design and sequencing of construction.

Yerkes Associates – August 14, 2009

Hershey's Mill Dam

Construction Phase for DEP Option 1 - Concrete Dam Installation

Item Description Cost
1 Contractor Mobilization and Pond Dewatering $10,000.00
2 Erect outer (dry) sediment control Barriers, delineate area of disturbance $6,000.00
3 Excavate stream channel, install coffer dam around existing drain pipe, 700 cy $68,000.00
4 Complete excavation for Phase 1 Dam (Silt disposal 1), 2,300 cy $157,000.00
5 Pour concrete foundation for Phase 1 Dam, 600 cy $180,000.00
6 Install new drain/valve assembly; Pour remainder of Phase 1 dam, 670 cy $296,000.00
7 Excavate, reconfigure coffer dam/reservoir to route stream channel/basin flow through new drain assembly (Silt disposal 2) $55,000.00
8 Complete excavation/demolition for Phase 2 Dam (Silt disposal 3), 1,600 cy $116,000.00
9 Pour concrete foundation for Phase 2 Dam, then Phase 2 Dam Structure, 450 cy $170,000.00
10 Backfill as required $120,000.00

Yerkes Associates – August 14, 2009

Item Description Cost
11 Install concrete spillway cap $15,000.00
12 Install emergency spillway rip-rap, backfill and stabilize disturbed areas, 1,800 sy $148,000.00
13 Fill Pond and test $25,000.00
14 Demobilize $10,000.00
Construction Phase Subtotal $1,376,000.00
DEP Option 1 TOTAL $1,471,000.00
Design + PERMITS 95,000.00
Total with Design & Permits 1,566,000

Assumptions:

  1. A concrete gravity dam of an approximate length of 340 feet is planned to extend along elevation 448 and be situated behind the existing stone wall/dam.
  2. The concrete dam is estimated to be 15 feet in height plus 3 foot height of foundation for a total height of 18 feet. Dam is estimated to be 3 feet in width and wider at the bottom, actual shape to be determined by load calculations and concrete form considerations.
  3. Pilings or other stabilization methods will not be required unless specifically identified.
  4. Cross sectional area of the concrete wall will be constant across the length, built to withstand the greater of the soil or water pressures.
  5. The land elevation downstream of the existing dam is approximately 438. The concrete dam will be designed to withstand interior forces on a freestanding basis using that downstream elevation should the dam and earthen embankment become compromised or be removed at a later date.
  6. Overtopping will occur at/above 448 and along the entire length of the concrete structure.
  7. No environmental hazards or soil contamination is found.
  8. All excavated silt and bulk material can be readily disposed.

HERSHEY'S MILL DAM COST ANALYSIS – DEP Option #2 Lowering Dam 6'

Description Amount
Permitting - CCCD, NPDES & DEP: $33,000.00
Mobilization & pond dewatering: $5,000.00
Pre-excavation & installation of stone access work surface: $12,000
Silt excavation & disposal for access to dam reduction area (1460 CY): $26,550
Excavate for & install coffer dam adjacent to outlet pipe: $15,000
Demo spillway slab and portion of east masonry training wall (30 CY): $5000
Vegetation clearing on dam prior to excavation: $2000
Excavate dam and spillway to 1' below final grade (582 CY) & haul: $20,000
Construct masonry training wall extensions: (2 @ 2'x15'x10'depth): $12,000
Place 2B stone & 8" conc. spillway (22'x34'x8") & tie to training walls: $9,000
Place R-5 or greater riprap on lowered berm area & grout in place: $19,500
Excavate new stream channel from upstream inlet points of original pond to outlet pipe and spillway: $35,000
Stabilize exposed pond surface with wetland plantings (10,695 SY) with 50% planting plugs in lower areas & 50% wetland seed mix in upper areas including preparation & straw mulch on seeded areas: $40,000
Remove coffer dam and other construction materials & demobilize: $7500
Subtotal $241,550
10% contingency $24,150
TOTAL $265,700

DRAFT
NRCS-LTP-31

U.S. Department of Agriculture
Natural Resources Conservation Service
6/2009

AGREEMENT FOR THE PURCHASE OF
CONSERVATION EASEMENT

THIS AGREEMENT is made by and between _________________________________ ("Landowner"), and the UNITED STATES OF AMERICA, by and through the Secretary of Agriculture ("United States"), on behalf of the Commodity Credit Corporation ("CCC"). Landowner and the United States are collectively referred to as "the Parties." The Natural Resources Conservation Service ("NRCS") is the administering agency on behalf of the United States.

For and in consideration of _________________________________ Dollars ($_____________) payable by the United States to the Landowner, Landowner agrees to sell to the United States a conservation easement on lands and interests, ("Property") in accordance with the following terms and conditions:

I. Purpose.

Landowner agrees that by signing this Agreement, the Landowner is enrolling the Property in the Wetlands Reserve Program ("WRP"), 16 USC 3837, and agrees to the restoration and maintenance of the Property for the duration of the WRP easement in accordance with the Warranty Easement Deed, appended hereto as Exhibit 1. NRCS will assist landowners in restoring and protecting the wetland functions and values of their properties through the development of a Wetlands Reserve Plan of Operations ("WRPO") by NRCS.

II. Property Description.

The Property is comprised of __________ acres, more or less, and is more fully described with the legal description of the Property in Exhibit 2, appended hereto.

TOGETHER, with an associated right-of-way, water uses, water rights, minerals, oil, gas, and geothermal resources depicted on Exhibit 3, appended hereto.

III. Purchase Price.

The purchase price is based on the value of the Property per acre multiplied by the number of acres. The Parties agree to adjust the purchase price to conform to the final acreage as determined by a survey procured by NRCS, unless otherwise mutually agreed to by the Parties. Any adjustment of purchase price or acreage will be incorporated in the Warranty Easement Deed, and by its execution, at closing, shall constitute the Parties' agreement to the adjustment.

NRCS will make a single payment unless Landowner requests ________________ annual installment payments. After the first installment payment, subsequent installment payments will be made in

1

the month of October. Payment will be made by the United States using Electronic Fund Transfers (EFT).

IV. Terms of Easement.

Landowner agrees to convey the conservation easement using the Warranty Easement Deed provided by NRCS. The period of the WRP conservation easement is in perpetuity or for a term of __________ years.

V. Management and Restoration Responsibilities of Landowner.

A. By signing this Agreement and enrolling in WRP, the Landowner agrees to the implementation of the WRPO, by NRCS, on the Property, consistent with the terms of the WRP easement. The Landowner authorizes NRCS to provide the cost share assistance either directly to the Landowner or through another entity, as determined by NRCS. These agreements and authorizations survive the termination of this Agreement.

B. For non-permanent easements, NRCS will not cost-share more than 75 percent of the total restoration cost; therefore, the Landowner must choose the method through which NRCS will provide restoration cost-share assistance. Landowners choosing a federal contract agree that NRCS will withhold an amount equivalent to 25 percent of the projected restoration cost-share from the easement payment in order to carry out the restoration on the Property in accordance with the WRPO. (Landowner choose a method and initial below)

Method: [ ] Federal Contract ____________________

[ ] Landowner or Partner Agreement ____________________

VI. Risk of Loss & Liabilities.

A. The risk of loss or damage to the Property occurring prior to the vesting of satisfactory title in the United States shall be borne by the Landowner. In the event of such loss or damage, NRCS may, at its discretion and without liability, withdraw from the transaction and terminate the Agreement.

B. In the event of loss or damage to the Property, the Parties may mutually agree to adjust the purchase price and proceed with the transaction based upon an acceptable WRP valuation methodology.

VII. Title.

A. The United States shall, at its cost, secure evidence of title satisfactory to the Attorney General of the United States, 40 USC 3111.

2

B. Prior to closing, the title to the Property shall be approved by the Department of Agriculture, Office of the General Counsel, in conformity with the title standards and regulations of the Attorney General of the United States.

C. Prior to closing, any encumbrance, exception or other cloud on title including encroachments shall be eliminated and quieted, unless deemed administratively acceptable by NRCS pursuant to instructions given by the Office of the General Counsel.

D. Landowner represents and warrants that Landowner has: full right, power, and authority to convey; that there is no condemnation or similar proceedings affecting any part of the Property and no proceedings shall be pending on the Closing Date; and that Landowner is not subject to any commitment, obligation, or agreement, including but not limited to, any rights of first refusal or option to purchase, granted to a third party, which would or could prevent Landowner from completing the sale of the Property as contemplated by this Contract.

E. Landowner agrees to pay at closing any taxes that are due or delinquent owing against the Property.

VIII. Closing.

A. NRCS has __________ months (not to exceed 12 months) from the date the designated NRCS official executes this Agreement to close on the conservation easement unless the Parties mutually agree to extend this Agreement prior to its expiration.

B. NRCS will select a closing company or closing agent and pay all normal costs of closing.

IX. Conveyance Instruments.

A. Landowner shall execute and deliver at closing a Warranty Easement Deed conveying a conservation easement on the Property to the United States of America.

B. Landowner shall deliver, without cost to the United States, any other documents that may be required to convey good and merchantable title, including trust instruments, powers of attorney, corporate resolutions, and similar instruments.

C. The deed or deeds of conveyance shall be prepared by NRCS in consultation with the Office of the General Counsel.

IX. General Provisions.

A. Landowner agrees that officers and authorized agents of the United States shall have at all reasonable times the right to enter upon the Property for any purpose related to purchasing the conservation easement, including inspection of the Property and the resources upon them, restoration planning, survey, and other due diligence work related to real property acquisition.

3

B. Landowner agrees not to do or authorize others to do any act by which the value or title to the Property may be diminished or encumbered, or the Property devalued, including the extraction of resources or materials (for example, oil, gas, minerals, timber), the manipulation of topography, or the release of hazardous materials or substances.

C. In the event of any violation of any of the terms of this Agreement, NRCS may void this Agreement and/or require repayment by Landowner of costs incurred in furtherance of this Agreement.

D. NRCS may, at its discretion and without liability, terminate this Agreement at any time due to the lack of availability of funds, inability to clear title, sale of the land, risk of hazardous substance contamination, or other reason.

E. The Parties agree that this Agreement shall not be assigned in whole or in part. Further, the Parties agree that no Member of Delegate to Congress or Resident Commissioner shall be a party to any share or part of this Agreement.

F. All covenants, warranties and representations made by Landowner shall survive this Agreement.

G. Irrespective of any violations by the Landowner of the terms of the conservation easement, the conservation easement survives and runs with the land for its duration.

IN WITNESS WHEREOF, Landowner has hereunto signed and affixed its respective seal on this _____ Day of _______________, 20___.

BY: _________________________________
Name: _________________________________
Title: _________________________________

ACKNOWLEDGMENT

STATE OF _____________________)
COUNTY OF ___________________)

On this _______________ day of _____________________ in the year 200_____, before me personally appeared _________________________________, a single person, known to me to be the person who is described in and who executed the within instrument, and acknowledged to me that she/he executed the same.

(SEAL)

_________________________________
Notary Public

4

____________________ County, ____________________

My commission expires: ____________________

The Secretary of the Department of Agriculture, acting and through his/her authorized representative has executed this Contract on behalf of the United States of America on this _____ Day of _______________, 20___.

THE UNITED STATES OF AMERICA

BY: _________________________________

NONDISCRIMINATION STATEMENT

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its program and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (1202) 720-2600 (voice and TDD). To file a complaint of discrimination write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 705-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

PRIVACY ACT STATEMENT

The above statements are made in accordance with the Privacy Act of 1974 (U.S.C. 522a). Furnishing this information is voluntary; however, failure to furnish correct, complete information will result in the withholding or withdrawal of such technical or financial assistance. The information may be furnished to other USDA agencies, the Internal Revenue Service, the Department of Justice, or other State or Federal Law enforcement agencies, or in response to orders of a court, magistrate, or administrative tribunal.

5

U.S. Department of Agriculture
Natural Resources Conservation Service
6/2009

NRCS-LTP-30

WARRANTY EASEMENT DEED

WETLANDS RESERVE PROGRAM
EASEMENT NO. ____________________

THIS WARRANTY EASEMENT DEED is made by and between _________________________________ of _________________________________ (hereafter referred to as the "Landowner"), Grantor(s), and the UNITED STATES OF AMERICA, by and through the Commodity Credit Corporation (CCC) (hereafter referred to as the "United States"), Grantee. The Landowner and the United States are jointly referred to as the "Parties". The acquiring agency of the United States is the Natural Resources Conservation Service (NRCS), United States Department of Agriculture.

Witnesseth:

Purposes and Intent. The purpose of this easement is to restore, protect, manage, maintain, and enhance the functional values of wetlands and other lands, and for the conservation of natural values including fish and wildlife and their habitat, water quality improvement, flood water retention, groundwater recharge, open space, aesthetic values, and environmental education. It is the intent of NRCS to give the Landowner the opportunity to participate in the restoration and management activities on the easement area. By signing this deed, the Landowner agrees to the restoration of the Easement Area and grants the right to carry out such restoration to the United States.

Authority. This easement deed acquisition is authorized by Title XII of the Food Security Act of 1985, as amended (16 U.S.C. §3837), for the Wetlands Reserve Program.

NOW THEREFORE, for and in consideration of the sum of _________________________________ Dollars ($__________________), the Grantor(s), hereby grants and conveys with general warranty of title to the UNITED STATES OF AMERICA and its assigns, the Grantee, forever or for a period of __________ years, all rights, title and interest in the lands comprising the easement area described in Part I and appurtenant rights of access to the easement area, but reserving to the Landowner only those rights, title, and interest expressly enumerated in Part II. It is the intention of the Landowner to convey and relinquish any and all other property rights not so reserved. This easement shall constitute a servitude upon the land so encumbered; shall run with the land for the duration of the easement; and shall bind the Landowner, (the Grantor(s)), their heirs, successors, assigns, lessees, and any other person claiming under them.

1

SUBJECT, however, to all valid rights of record, if any.

PART I. Description of the Easement Area. The lands encumbered by this easement deed, referred to hereafter as the easement area, are described on EXHIBIT A which is appended to and made a part of this easement deed.

TOGETHER with a right of access for ingress and egress to the easement area across adjacent or other properties of the Landowner. Such a right-of-way for access purposes is described in EXHIBIT B which is appended to and made a part of this easement deed.

PART II. Reservations in the Landowner on the Easement Area. Subject to the rights, title, and interest conveyed by this easement deed to the United States, including the restoration, protection, management, maintenance, enhancement, and monitoring of the wetland and other natural values of the easement area, the Landowner reserves:

A. Title. Record title, along with the Landowner's right to convey, transfer, and otherwise alienate title to these reserved rights.

B. Quiet Enjoyment. The right of the Landowner to enjoy the rights reserved on the easement area without interference from others.

C. Control of Access. The right to prevent trespass and control access by the general public subject to the operation of State and Federal law.

D. Recreational Uses. The right to undeveloped recreational uses, including undeveloped hunting and fishing and leasing of such rights for economic gain, pursuant to applicable State and Federal regulations that may be in effect at the time. Undeveloped recreational uses must be consistent with the long-term protection and enhancement of the wetland and other natural values of the easement area. Undeveloped recreational use may include hunting equipment, such as, tree stands and hunting blinds that are rustic and customary for the locale as determined by NRCS.

E. Subsurface Resources. The right to oil, gas, minerals, and geothermal resources underlying the easement area, provided that any drilling or mining activities are to be located outside the boundaries of the easement area, unless activities within the boundaries are specified in accordance with the terms and conditions of EXHIBIT C which is appended to and made a part of this easement deed, if applicable.

F. Water uses and water rights. The right to water uses and water rights identified as reserved to the Landowner in EXHIBIT D which is appended to and made a part of this easement deed, if applicable.

2

PART III. Obligations of the Landowner. The Landowner shall comply with all terms and conditions of this easement, including the following:

A. Prohibitions. Without otherwise limiting the rights of the United States acquired hereunder, it is expressly understood that the rights to carry out the following activities and uses have been acquired by the United States and, unless authorized by the United States under Part IV, are prohibited on the easement area:

  1. haying, mowing, or seed harvesting for any reason;
  2. altering of grassland, woodland, wildlife habitat or other natural features by burning, digging, plowing, disking, cutting or otherwise destroying the vegetative cover;
  3. dumping refuse, wastes, sewage, or other debris;
  4. harvesting wood products;
  5. draining, dredging, channeling, filling, leveling, pumping, diking, impounding, or related activities, as well as altering or tampering with water control structures or devices, except as specifically set forth in EXHIBIT D, if applicable;
  6. diverting or causing or permitting the diversion of surface or underground water into, within, or out of the easement area by any means, except as specifically set forth in EXHIBIT D, if applicable;
  7. building, placing, or allowing to be placed structures on, under, or over the easement area, except for structures for undeveloped recreational use;
  8. planting or harvesting any crop;
  9. grazing or allowing livestock on the easement area;
  10. disturbing or interfering with the nesting or brood-rearing activities of wildlife including migratory birds;
  11. use of the easement area for developed recreation. These uses include but are not limited to, camping facilities, recreational vehicle trails and tracks, sporting clay operations, skeet shooting operations, firearm range operations and the infrastructure to raise, stock, and release captive raised waterfowl, game birds and other wildlife for hunting or fishing;
  12. any activities which adversely impact or degrade wildlife cover or other habitat benefits, water quality benefits, or other wetland functions and values of the easement area; and
  13. any activities to be carried out on the Landowner's land that is immediately adjacent to, and functionally related to, the land that is subject to the easement if such activities will alter, degrade, or otherwise diminish the functional value of the eligible land.

B. Noxious Plants and Pests. The Landowner is responsible for noxious weed control and emergency control of pests as required by all Federal, State, and local laws. A

3

plan to control noxious weeds and pests must be approved in writing by the NRCS prior to implementation by the Landowner.

C. Fences. Except for establishment cost incurred by the United States and replacement cost not due to the Landowner's negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock shall be the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the easement area are prohibited on the easement or easement boundary.

D. Use of water for easement purposes. The landowner shall use water for easement purposes as set forth in EXHIBIT D, which is appended to and made a part of this easement deed, if applicable.

E. Protection of water uses and water rights. As set forth in EXHIBIT D, if applicable, the Landowner shall undertake actions necessary to protect any water rights and water uses for easement purposes.

F. Taxes. The Landowner shall pay any and all real property and other taxes and assessments, if any, which may be levied against the land.

G. Reporting. The Landowner shall report to the NRCS any conditions or events which may adversely affect the wetland, wildlife, and other natural values of the easement area.

H. Survival. Irrelevant of any violations by the Landowner of the terms of this deed, this easement survives and runs with the land for its duration.

PART IV. Compatible Uses by the Landowner.

A. General. The United States may authorize, in writing and subject to such terms and conditions the NRCS may prescribe at its sole discretion, the use of the easement area for compatible economic uses, including, but not limited to, managed timber harvest, periodic haying, or grazing.

B. Limitations. Compatible use authorizations will only be made if, upon a determination by NRCS in the exercise of its sole discretion and rights, that the proposed use is consistent with the long-term protection and enhancement of the wetland and other natural values of the easement area. The NRCS shall prescribe the amount, method, timing, intensity, and duration of the compatible use.

PART V. Rights of the United States. The rights of the United States include:

4

A. Management activities. The United States has the right to enter the easement area to undertake, on a cost-share basis with the Landowner or other entity as determined by the United States, any activities to restore, protect, manage, maintain, enhance, and monitor the wetland and other natural values of the easement area. The United States may apply to or impound additional waters, in accordance with State water law, on the easement area in order to maintain or improve wetland and other natural values.

B. Access. The United States has a right of reasonable ingress and egress to the easement area over the Landowner's property, whether or not the property is adjacent or appurtenant to the easement area, for the exercise of any of the rights of the United States under this easement deed. The authorized representatives of the United States may utilize vehicles and other reasonable modes of transportation for access purposes. To the extent practical, the United States shall utilize the access identified in EXHIBIT B.

C. Easement Management. The Secretary of Agriculture, by and through the NRCS, may delegate all or part of the management, monitoring or enforcement responsibilities under this easement to any entity authorized by law that the NRCS determines to have the appropriate authority, expertise and resources necessary to carry out such delegated responsibilities. State or federal agencies may utilize their general statutory authorities in the administration of any delegated management, monitoring or enforcement responsibilities for this easement. The authority to modify or terminate this easement (16 U.S.C. §3837e(b)) is reserved to the Secretary of Agriculture in accordance with applicable law.

D. Violations and Remedies - Enforcement. The Parties, Successors, and Assigns, agree that the rights, title, interests, and prohibitions created by this easement deed constitute things of value to the United States and this easement deed may be introduced as evidence of same in any enforcement proceeding, administrative, civil or criminal, as the stipulation of the Parties hereto. If there is any failure of the Landowner to comply with any of the provisions of this easement deed, the United States or other delegated authority shall have any legal or equitable remedy provided by law and the right:

  1. To enter upon the easement area to perform necessary work for prevention of or remediation of damage to wetland or other natural values; and,
  2. To assess all expenses incurred by the United States (including any legal fees or attorney fees) against the Landowner, to be owed immediately to the United States.

PART VI. General Provisions.

5

A. Successors in Interest. The rights granted to the United States shall accrue to any of its agents or assigns. All obligations of the Landowner under this easement deed shall also bind the Landowner's heirs, successors, agents, assigns, lessees, and any other person claiming under them. All the Landowners who are parties to this easement deed shall be jointly and severally liable for compliance with its terms.

B. Rules of Construction and Special Provisions. All rights in the easement area not reserved by the Landowner shall be deemed acquired by the United States. Any ambiguities in this easement deed shall be construed in favor of the United States to effect the wetland and conservation purposes for which this easement deed is being acquired. The property rights of the United States acquired under this easement shall be unaffected by any subsequent amendments or repeal of the Wetlands Reserve Program. If the Landowner receives the consideration for this easement in installments, the Parties agree that the conveyance of this easement shall be totally effective upon the payment of the first installment.

C. Environmental Warranty. "Environmental Law" or "Environmental Laws" means any and all Federal, State, local or municipal laws, orders, regulations, statutes, ordinances, codes, guidelines, policies, or requirements of any governmental authority regulating or imposing standards of liability or standards or conduct (including common law) concerning air, water, solid waste, hazardous materials or substance, worker and community right-to-know, hazard communication, noise, radioactive material, resource protection, subdivision, inland wetlands and watercourses, health protection and similar environmental health, safety, building and land use as may now or at any time hereafter be in effect.

"Hazardous Materials" means any petroleum, petroleum products, fuel oil, waste oils, explosives, reactive materials, ignitable materials, corrosive materials, hazardous chemicals, hazardous wastes, hazardous substances, extremely hazardous substances, toxic substances, toxic chemicals, radioactive materials, infectious materials, and any other element, compound, mixture, solution or substance which may pose a present or potential hazard to human health or the environment.

Landowner warrants that it is in compliance with, and shall remain in compliance with, all applicable Environmental Laws. Landowner warrants that there are no notices by any government authority of any violation or alleged violation of, non-compliance or alleged non-compliance with or any liability under any Environmental Law relating to the operations or conditions of the Property. Landowner further warrants that it has no actual knowledge of a release or threatened release of Hazardous Materials, as such substance and wastes are defined by applicable Federal and State law.

6

D. General Indemnification. Landowner shall indemnify and hold harmless , its employees, agents, and assigns for any and all liabilities, claims, demands, loses, expenses, damages, fines, fees, penalties, suits, proceedings, actions, and cost of actions, sanctions asserted by or on behalf of any person or government authority, and other liabilities (whether legal or equitable in nature and including, without limitation, court costs, and reasonable attorneys' fees and attorneys' fees on appeal) to which the United States may be subject or incur relating to the easement area, which may arise from, but is not limited to, Landowner's negligent acts or omissions or Grantor's breach of any representation, warranty, covenant, agreements contained in this easement deed, or violations of any Federal, State, or local laws, including all Environmental Laws.

E. Maintenance Requirement. The Landowner agrees to the maintenance of the easement area and all required restoration practices and measures, developed by NRCS.

7

TO HAVE AND TO HOLD, this Warranty Easement Deed is granted to the United States of America and its assigns for the duration of the easement. The Landowner covenants that he, she, or they are vested with good title to the easement area and will warrant and defend the same on behalf of the United States against all claims and demands. The Landowner covenants to comply with the terms and conditions enumerated in this document for the use of the easement area and adjacent lands for access, and to refrain from any activity not specifically allowed or that is inconsistent with the purposes of this easement deed.

Dated this _____ day of ____________________, 2_____.

Landowner(s): __________________________________________________

__________________________________________________

ACKNOWLEDGMENT

STATE OF ____________________
COUNTY OF ____________________

On this _____ day of ____________________, 2_____, before me, the undersigned, a Notary Public in and for said State personally appeared ________________________________________, know or proved to me to be the person{s} described in and who executed the foregoing instrument, and acknowledged that _____ executed the same as _____ free act and deed.

IN TESTIMONY WHEREOF, I have hereunto set my hand and official seal the day and year first above written.

__________________________________________________
Notary Public for the State of ____________________
Residing at ________________________________________
My Commission Expires ______________________________

8

ACCEPTANCE BY GRANTEE:

I ____________________ (name), ____________________ (title), being the duly authorized representative of the United States Department of Agriculture, Natural Resources Conservation Service, do hereby accept this Conservation Easement Deed with respect to the rights and duties of the United States of America, Grantee.

Dated this _____ day of ____________________, 2_____.

__________________________________________________
Signature

__________________________________________________
Title

This instrument was drafted by the Office of the General Counsel, U.S. Department of Agriculture, Washington, D.C. 20250-1400.

NONDISCRIMINATION STATEMENT

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its program and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (1202) 720-2600 (voice and TDD). To file a complaint of discrimination write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 705-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

PRIVACY ACT STATEMENT

The above statements are made in accordance with the Privacy Act of 1974 (U.S.C. 522a). Furnishing this information is voluntary; however, failure to furnish correct, complete information will result in the withholding or withdrawal of such technical or financial assistance. The information may be furnished to other USDA agencies, the Internal Revenue Service, the Department of Justice, or other State or Federal Law enforcement agencies, or in response to orders of a court, magistrate, or administrative tribunal.

9

Department of Justice, or other State or Federal Law enforcement agencies, or in response to orders of a court, magistrate, or administrative tribunal.

10

[Aerial photograph/map showing a wooded stream corridor with a hatched polygon in the center marking the Proposed Easement Area (1.7 Ac.) in East Goshen Township, Chester County.]

East Goshen Township EWP-FPE

Chester Co.

Proposed Easement Area - 1.7 Ac.

1

Scale: 0 62.5 125 250 375 500

PA391 - 1

NATURAL RESOURCES CONSERVATION SERVICE

CONSERVATION PRACTICE STANDARD

RIPARIAN FOREST BUFFER

(Ac.)

CODE 391

DEFINITION

An area predominantly trees and/or shrubs located adjacent to and up-gradient from watercourses or water bodies.

PURPOSE

  • Create shade to lower or maintain water temperatures to improve habitat for aquatic organisms.
  • Create or improve riparian habitat and provide a source of detritus and large woody debris.
  • Reduce stream bank or shoreline erosion.
  • Reduce excess amounts of sediment, organic material, nutrients and pesticides in surface runoff and reduce excess nutrients and other chemicals in shallow ground water flow.
  • Reduce pesticide drift entering the water body.
  • Increase in-stream processing of organic material, nutrients, and other chemicals.
  • Restore native riparian plant communities.
  • Increase carbon storage in plant biomass and soils.

CONDITIONS WHERE PRACTICE APPLIES

Riparian forest buffers are applied on areas adjacent to permanent or intermittent streams, lakes, ponds, and wetlands. They are not applied solely to stabilize stream banks or shorelines.

CRITERIA

General Criteria Applicable to All Purposes

The riparian forest buffer shall be positioned appropriately and designed to achieve sufficient width, length, vertical structure/density and connectivity to accomplish the intended purpose(s).

Dominant vegetation will consist of existing, naturally regenerated, or seeded/planted native trees and shrubs suited to the soil and hydrology of the site and the intended purpose(s).

The riparian forest buffer will extend a minimum width to achieve the purpose(s). The width measurement shall begin at the top of the bank.

Overland flow through the riparian area will be maintained as sheet flow.

For sites to be regenerated or seeded/planted, excessive sheet-rill and concentrated-flow erosion will be controlled.

Excessive sheet-rill and concentrated-flow erosion will be controlled in the areas immediately adjacent and up-gradient of the buffer site.

Use tree and shrub species that are native and non-invasive. Substitution with improved and locally accepted cultivars or purpose-specific species is allowed. For plantings and seedings, only viable, high-quality and adapted plant materials will be used.

Favor tree and shrub species that have multiple values such as those suited for timber, biomass, nuts, fruit, browse, nesting, aesthetics and tolerance to commonly used herbicides.

Pennsylvania

March 2008

PA391-2

Periodic removal of some forest products such as high value trees, medicinal herbs, nuts, and fruits is permitted provided the intended purpose is not compromised by the loss of vegetation or harvesting disturbance.

Necessary site preparation and planting shall be done at a time and manner to insure survival and growth of selected species for achieving the intended purpose(s). Refer to the standards Tree/Shrub Site Preparation, 490 and Tree/Shrub Establishment, 612.

Livestock shall be excluded. Refer to the standard Use Exclusion, 472.

State noxious weeds present on the site will be controlled or eliminated as necessary to achieve and maintain the intended purpose. If pesticides are used, refer to the standard Pest Management, 595.

No structures, permanent or temporary, or paved surfaces that would reduce or substantially alter the functioning of the riparian forest buffer will be included or installed. Vehicular traffic will be limited to only that necessary to perform operation and maintenance.

Additional Criteria to Improve Water Quality

The minimum width shall be 35 feet measured horizontally on a line that is perpendicular to the near edge of the water body, beginning at the top of the bank.

A functioning riparian forest buffer shall have sufficient canopy closure when trees are at least 10 to 15 years old, even though an acceptable time to assess tree establishment is three to five years after planting.

Surface water on land adjacent to the riparian buffer shall be controlled and maintained as sheet flow to and through the buffer. Sheet flow may be accomplished with well managed forest, pasture, or cropland; however, a Filter Strip, 393, may be needed immediately upslope to maintain sheet flow to the riparian forest buffer.

Additional Criteria to Reduce Excess Amounts of Sediment, Organic Material, Nutrients and Pesticides in Surface Runoff and Reduce Excess Nutrients and Other Chemicals in Shallow Ground Water Flow

The minimum width shall be extended to 50 feet and/or a Filter Strip, 393, shall be installed immediately upslope of a 35 foot wide buffer in high nutrient, sediment, and animal waste application areas, where the contributing area is not adequately treated or where an additional level of protection is needed.

Additional Criteria to Create or improve riparian habitat and provide a source of detritus and large woody debris.

The width will be extended to meet the minimum habitat requirements of the wildlife or aquatic species of concern.

Establish plant communities that address the needs of target aquatic and terrestrial wildlife and have multiple values such as habitat, nutrient uptake and shading.

Additional Criteria for Increasing Carbon Storage in Biomass and Soils

Maximize width and length of the riparian forest buffer.

Select plants that have higher rates of carbon sequestration in soils and plant biomass, and are adapted to the site to assure strong health and vigor. Plant the appropriate stocking rate for the site.

CONSIDERATIONS

Tree and shrub species that may be alternate hosts to undesirable pests should be avoided. Species diversity should be maximized to avoid loss of function due to species-specific pests.

Allelopathic impacts of plants should be considered.

The location, layout, and density of the buffer should complement natural features and mimic natural riparian forests.

Existing functional underground drains through the riparian area will pass pollutants directly to the outlet. To filter such pollutants, existing drains can be plugged, removed, or replaced with perforated pipe with end plugs to allow

Pennsylvania

March 2008

PA391-3

passage and filtration of drain water through the riparian forest root zone. Existing drains may also be outleted up-gradient from the buffer. Caution is advised that saturated conditions in the riparian and adjacent areas may limit existing land use and management.

For sites where the continued functioning of drains is desired, trees and shrubs should not be planted over the drains. Maintain the area over and adjacent to the drains in herbaceous cover.

Maximizing widths, lengths, and connectivity of riparian forest buffers will maximize water quality, carbon storage, and wildlife habitat benefits. Incorporating a Filter Strip, 393, upgrade along the buffer may also increase these benefits.

The species and plant communities that attain higher biomass levels more quickly will sequester carbon at a faster rate. The rate of carbon sequestration is enhanced as riparian plants mature and soil organic matter increases.

Establishing trees and shrubs in riparian areas is not the same as traditional reforestation plantings. The soils and site conditions may be quite different from most reforestation projects (more fertility and weed pressure in riparian areas), and potential wildlife damage to trees and shrubs may be worse due to increasing function as wildlife travel corridors.

Shelters or tubes, with bird nets, are recommended for trees to enhance growth and protect the seedlings from rodents, rabbits, and deer. Multi-year herbicide application directly around shelters is recommended to improve tree growth and survival.

Fencing must be installed to effectively exclude livestock if the adjacent area is going to be pastured. This will protect tree and shrub roots from damage due to soil compaction and also from browsing of canopies. Livestock crossings, alternative water sources, and stabilized walkways through the riparian buffer have the potential to add considerable cost to the project, but are essential to meeting any intended water quality purposes.

PLANS AND SPECIFICATIONS

Specifications shall be prepared for each site and recorded using approved specification sheets, job sheets, technical notes, and narrative statements in the conservation plan, or other approved documentation.

OPERATION AND MAINTENANCE

The riparian forest buffer will be inspected periodically and protected from adverse impacts that may occur from activities such as vehicular and pedestrian traffic, pest infestations (damaging weeds, insects, funguses, etc.), concentrated flows, pesticides, livestock or wildlife damage and fire.

Replacement of dead trees or shrubs and control of competing vegetation will continue until the buffer is, or will progress to, a fully functional condition.

Any manipulation of species composition, stand structure, or stocking by cutting or killing selected trees and understory vegetation shall sustain the intended purpose(s). Refer to the standard Forest Stand Improvement, 666.

Control or exclusion of livestock and harmful wildlife shall continue. Refer to the standard Use Exclusion, 472, as applicable.

Fertilizers, pesticides and other chemicals used to maintain buffer function shall not impact water quality.

REFERENCES

Palone, R.S. and A.H. Todd (editors.) 1997. Chesapeake Bay Riparian Handbook, USDA Forest Service, NA-TP-02-97, Radnor, PA. Web site: http://www.chesapeakebay.net/pubs/subcommittee/nsc/forest/handbook.htm

Alliance for the Chesapeake Bay, 1998. Pennsylvania Stream ReLeaf Forest Buffer Toolkit. Available through the Pennsylvania Department of Environmental Protection, Bureau of Watershed Conservation, Harrisburg, PA Web site: http://www.dep.state.pa.us/dep/deputate/watermgt/wc/Subjects/StreamReleaf/Forestbufftool/default.htm

Pennsylvania

March 2008

PA391-SP1

NATURAL RESOURCES CONSERVATION SERVICE

RIPARIAN FOREST BUFFER

(Ac.)

SPECIFICATION

CODE 391

SCOPE

The work shall consist of furnishing planting stock and other materials, and installing all components of the riparian forest buffer.

Planting Trees and Shrubs

The maximum spacing for trees shall be 20 feet by 20 feet (100 to 150 tree seedlings per acre). At this low planting density, two to three year old bare-root or containerized tree seedlings (3-4 inch pots), or larger planting stock, shall be used. Shrubs shall be planted at a closer spacing, six to eight feet, either in the tree rows or in clump plantings.

When tree shelters or tubes are used, shelters shall be made of a translucent, mesh, or netting material and be at least four feet tall, preferably five feet tall in areas of moderate to heavy deer pressure. Shelters shall be sealed at the bottom. Bird nets shall be used with solid shelters, and shall be removed before the saplings emerge from the shelter.

Shelters shall be securely anchored using a durable stake. Wooden stakes shall be hardwood, a minimum one inch by one inch, and not include sapwood.

Shelters with perforated seams may be left on the trees. Shelters without perforated seams shall be split lengthwise or removed when sapling trunks are 1 ½ inches in diameter at the top of the shelter. This removal criteria also applies to metal stakes.

Planting Trees and Shrubs to Improve Water Quality

The first two rows adjacent to the stream or water body shall be deciduous broad-leaved trees (hardwoods). Both trees and shrubs may be planted beyond the first two rows. Coniferous trees shall be limited to a maximum of 20 percent of the total number of trees planted, excluding the first two rows. All trees and shrubs shall be native to the U.S., and preferably native to Pennsylvania. See attached list of RECOMMENDED PLANTS.

ADDITIONAL CONDITIONS WHICH APPLY TO THIS PROJECT ARE:

Pennsylvania

March 2008

PA391-SP2

RECOMMENDED PLANTS

US – Plant is native to the U.S.
PA – Plant is native to Pennsylvania

Common Name Scientific Name
Alder, smooth (PA)Alnus serrulata
Ash, American mountain (PA)Sorbus Americana
Aspen, quaking (PA)Populus tremuloides
Bayberry, northern (PA)Myria pensylvanica
Beech, American (PA)Fagus grandifolia
Birch, paper (PA)Betula papyifera
Birch, river (PA)Betula nigra
Bittersweet, American (PA)Celastrus scandens
Blueberry, highbush (PA)Vaccinium corymbosum
Buttonbush (PA)Cephalanthus occidentalis
Cedar, red (PA)Juniperus virginiana
Cedar, white (PA)Thuja occidentalis
Cherry, black (PA)Prunus serotina
Cherry, choke (PA)Prunus virginiana
Chinquapin, Alleghany (PA)Castanea pumila
Chokeberry, black (PA)Aronia melanocarpa
Chokeberry, red (PA)Aronia arbutifolia
Coralberry (PA)Symphoricarpos orbiculatus
Crabapple, American (PA)Malus coronaria
Dogwood, flowering (PA)Cornus florida
Dogwood, graystem (PA)Cornus racemosa
Dogwood, redosier (PA)Cornus stolonifera
Dogwood, silky (PA)Cornus amomum
Elderberry, American (PA)Sambucus canadensis
Fir, balsam (PA)Abies balsamea
Fir, Douglas (US)Pseudotsuga menziesii
Fir, Fraser (PA)Abies fraseri
Fir, White (US)Abies concolor
Gum, black (PA)Nyssa sylvatica
Gum, sweet (PA)Liquidambar styraciflua
Hackberry (PA)Celtis occidentalis
Hawthorn, cockspur (PA)Crataegus crus-galli
Hawthorn, Washington (PA)Crataegus phaenopyrum
Hazlenut, American (PA)Corylus americana
Hazlenut, beaked (PA)Corylus rostrata
Hemlock, eastern (PA)Tsuga canadensis
Hickory, shagbark (PA)Carya ovata
Holly, American (PA)Ilex opaca

Pennsylvania

March 2008

PA391-SP3

Common Name Scientific Name
Honeysuckle, amur (PA)Lonivera maackii
Inkberry (PA)Ilex glabra
Locust, black (PA)Robinia pseudoacacia
Locust, bristly (US)Robinia fertilis
Maple, red (PA)Acer rubrum
Maple, sugar (PA)Acer saccharum
Mulberry, red (PA)Morus rubra
Oak, black (PA)Quercus veluntina
Oak, pin (PA)Quercus palustris
Oak, red (PA)Quercus rubra
Oak, scrub (PA)Quercus ilicifolia
Oak, swamp white (PA)Quercus bicolor
Oak, white (PA)Quercus alba
Pine, red (PA)Pinus resinosa
Pine, white
Eastern (PA)
Southwestern (US)
Pinus strobus
Pinus strobiformis
Redbud (PA)Cercis canadensis
Rhododendron, great (PA)Rhododendron maximum
Sassafras (PA)Sassafras albidum
Serviceberry (PA)Amelanchier canadensis
Spruce, black (PA)Picea mariana
Sumac, aromatic (PA)Rhus aromatica
Sumac, smooth (PA)Rhus glabra
Sumac, staghorn (PA)Rhus typhina
Sycamore, American (PA)Platanus occidentalis
Tuliptree (PA)Liriodendron tulipifera
Viburnum, arrowood (PA)Viburnum dentatum
Viburnum, blackhaw (PA)Viburnum prunifolium
Viburnum, highbush cranberry (PA)Viburnum trilobum
Viburnum, nannyberry (PA)Viburnum lentago
Viburnum, wild raisin (PA)Viburnum cassinoides
Walnut, black (PA)Juglans nigra
Willow, black (PA)Salix nigra
Winterberry (PA)Ilex verticillata

Pennsylvania

March 2008

Pennsylvania Department of Environmental Protection

[Logo: DEP]

Rachel Carson State Office Building
P.O. Box 8554
Harrisburg, PA 17105-8554
July 20, 2009

Bureau of Waterways Engineering

717-772-5957

Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

[Stamp: RECEIVED BY: JUL 22 2009]

[Handwritten: DERIEMER OPTION]

RE: Alternatives Review
Hershey Mill Dam
East Goshen Township, Chester County
DEP File No. D15-125

Dear Mr. Smith:

We have received and reviewed the information you submitted to our office on June 25, 2009, concerning the needed rehabilitation of the Hershey Mill Dam. Our review of this information has resulted in the following comments:

  • 1. The alternative developed by Edward B. Walsh & Associates, Inc. includes lowering the crest (normal pool) of the existing spillway 1.25 feet to El. 446.75, constructing two 45-foot wide emergency spillways at El. 448.0, and raising the top of the dam to El. 451.0. Conceptually these proposed changes would have sufficient capacity to pass the 100-year design storm with about 0.5 feet of freeboard.
  • 2. While the capacity of the proposed spillways is sufficient, the proposed spillway lining protection, Turf Reinforcement Matting (TRM), is not acceptable for use. These emergency spillways will be activated for frequent storm events, as the 2-year, 24-hour storm would cause a flow depth of about 0.5 feet, plus they are to be located through the earthfill portion of the dam, which is highly erodible. For spillways located through the dam or on earthfill, the Department requires the lining to be of reinforced concrete. This is common dam design practice by other state dam safety programs and federal agencies.
  • 3. In addition to reviewing the documents developed by Edward B. Walsh & Associates, Inc., we reviewed the conceptual plans developed by Yerkes Associates, Inc., which were included on the compact disc. Yerkes's Option 1 approach seems to be the best option for rehabilitating this dam with the following suggested revisions:

An Equal Opportunity Employer — www.dep.state.pa.us — Printed on Recycled Paper

Louis F. Smith, Jr., Manager
East Goshen Township

- 2 -

July 20, 2009

  • a. If the normal pool is lowered to El. 446.75 and the top of dam is raised to El. 451.0, as proposed by Walsh, then a 90-foot wide emergency spillway at El. 448.0, similar to Yerkes's Option 1, will be acceptable.
  • b. We recommend that the emergency spillway be one complete structure and placed adjacent to the existing primary spillway.
  • c. The apron area of Yerkes's Option 1 will need to be modified to prevent any undercutting of the spillway toe. This would best be done by extending the heel of the retaining wall so that the discharge flow over the crest of the weir would splash onto reinforced concrete.

Also, on July 9, 2009, representatives of the Division conducted a thorough visual inspection of the dam, Inspection Notice enclosed. This inspection resulted in significant concerns beyond that of the inadequate spillway. Below is a brief summary of our findings:

  • 1. The dam was overgrown with thick vegetation, which made a thorough visual inspection difficult in some areas; however, it was obvious that the crest and slopes of the dam are uneven, overly steep in certain areas, and there appeared to be evidence that the dam has been overtopped by water in the past.
  • 2. Several large trees are growing on the downstream face of the dam, which are compromising its integrity. It was noticed that the roots from some of these trees pass through the dam and directly to the lake level. These trees and their root systems will need to be removed as part of the rehabilitation of this dam.
  • 3. Along the left toe of the embankment an in-ground swimming pool was constructed at some point in the past. The swimming pool itself is not a concern, but in order to create a patio area around the pool it appears that a portion of the downstream face was removed and a small stone wall constructed. This has resulted in the downstream slope of the dam through this portion being steepened beyond acceptable levels.
  • 4. In order to conduct the work needed at this dam, it appears that adjacent properties will need to be affected. This will require that at least temporary easements be obtained. Also, should increasing the dam height be pursued as part of rehabilitating the structure, flowage easements will be required for all properties located around the lake that could be inundated to the top of dam elevation.

Given the extent of work that will be required to properly repair this dam, it is our belief that the most cost effective solution for the situation would be for the Township to consider utilizing the potential federal stimulus funding for breaching of the dam. We understand that this may not be the best received solution from the property owners surrounding the dam or the citizens of the Township; however, it will remove the significant liability and responsibilities that come with ownership of a dam. The Township could then consider constructing a smaller, reduced Hazard Potential dam, or restore the impoundment area of the dam to create an environmental education area as part of the park.

Louis F. Smith, Jr., Manager
East Goshen Township

- 3 -

July 20, 2009

As you know, it is the Township decision to either pursue keeping and rehabilitating this dam or breaching it. In either case, our office will continue to work with the Township toward a resolution, while ensuring the safe operation and maintenance of the dam.

Should you have any questions concerning our comments, please contact me at the above number.

Sincerely,

[Signature]
Richard A. Reisinger, P.E.
Chief
Delaware Watershed Section
Division of Dam Safety

Enclosure: July 9, 2009, Dam Safety Inspection Notice

cc: Rep. Barbara McIlvaine Smith
Edward B. Walsh & Associates, Inc.
Yerkes Associates, Inc.

Neil DeRiemer
1034 Hershey Mill Road
West Chester, Pa/ 19380

August 12, 2009

The Board of Supervisors
East Goshen Township
1580 Paoli Pike
West Chester, Pa 19380-6199

Re: The Hershey Mill Pond, Dam and Waterfall Property.

Gentlemen,

By this letter, Neil B. DeRiemer, or his nominee, ("NBD"), indicates its desire to accept the East Goshen Township's, ("Owner") offer to purchase the above referenced property defined in attached "Exhibit A", ("Property"), for a price of One Dollar ($1.00) . NBD will settle on the Property within 30 days of an executed Agreement of Sale acceptable to its attorney and East Goshen Township's attorney, ("Agreement"), subject to NBD's sole approval of the following conditions, which will be performed at NBD's expense should there be any:

  • 1. Clear and marketable title to the Property, insurable at normal market rates and a final determination of the grounds remaining after any proposed condemnations.
  • 2. Environmental status and impact report for the Property and the surrounding area real estate, including any underground storage tanks.
  • 3. East Goshen Township ("EGT") agrees to name NBD as an additional insured and continue to carry and pay for its existing Liability, Open Space and other insurance coverage as EGT presently carries on its existing Parks and Open Space.
  • 4. EGT agrees to accept an easement to/for the Property for continued use as Open Space with the understanding that the annual cost of the easement to EGT shall be limited to the continued annual cost of insurance coverage referenced in item 3. above and continued annual cost of maintenance of the Property as historically expended by EGT, subject to normal cost increases.
  • 5. Prior to Closing, EGT shall not (i) transfer or assign any rights, title or interest in or with respect to the Property to any person, entity, or governmental agency, (ii) alter, breech or demolish the dam or otherwise change the condition of the Property, or otherwise allow or permit any such alteration, breech, demolition or change, or (iii) mortgage or encumber the Property or otherwise make the Property subject to any agreement.
  • 6. EGT agrees to assist NBD in seeking and applying for any public or private funding which is or may become available to restore, maintain or upgrade the Property.

Neil DeRiemer
1034 Hershey Mill Road
West Chester, Pa/ 19380

If the basic terms and conditions above meet your approval, please have the Owner's representative sign the enclosed copies of this letter below where indicated and return one original to NBD by August 17, 2009. Your signature will confirm that NBD is an "equitable owner" of the Property as of August 17, 2009 and further confirm you have the power and authority to bind the Owners to the terms and conditions of this letter. NBD will submit a formal Agreement of Sale within 15 working days of its receipt of a signed copy of this letter.

NBD may begin complete "due diligence" upon its receipt of a signed copy of this letter, which when received by NBD, gives NBD the Owner's permission and access to the Property to do so.

Sincerely,

Neil DeRiemer
1034 Hershey Mill Road
West Chester, Pa 19380

Agreed to and Accepted by: ______________________________ / ________
(Print Name and Title) Date
East Goshen Township

[Flyer with a photo of a dam/waterfall on the left]

Keep the Waterfall
Save the Dam

Hershey's Mill Dam is in Danger!

The East Goshen Township Board of Supervisors Is Voting on August 18th to Accept Federal Money to Tear Down the Dam

We Need Your Help Contact the Supervisors

Tell Them to Vote “NO”

e-mail: egtadmin@eastgoshen.org Phone: 610-692-7171

For more information and to see how you can help save the Hershey's Mill Dam go to:

www.savethedam.org

Hershey's Mill Dam Greenhill & Hershey Mill Road West Chester, PA 19380

[Photo of dam / waterfall]

KEEP THE WATERFALL
SAVE THE DAM
www.savethedam.org

Hershey's Mill Dam

Fact Sheet

  • Hershey's Mill Dam (located at the intersection of Hershey's Mill and Greenhill Roads) is a public area owned by East Goshen Township and is not privately owned.
  • It is believed that the original dam was built in the 1800s.
  • The dam was used originally to power the adjacent gristmill and the pond was used during the winter to gather ice for food preservation.
  • In the last 30 years due to natural causes, the dam has been breached once (and rebuilt) and overflowed three times with no loss of life or property in either event.
  • The Department of Environmental Protection (DEP) regulates dam structures in the Commonwealth of Pennsylvania.
  • The Hershey's Mill Dam is classified as a C-2 Dam and the current structure does not meet the discharge capacity necessary to accommodate safely the recommended design flood of a C-2 dam.
  • Several alternatives have been identified (including some from the DEP) to modify the current structure in order for the Hershey's Mill Dam to comply with the DEP Dam Safety Code. Create a secondary spillway to handle increased water flow during a high volume storm; Reinforce the existing dam structure to guard against a breach; Breach the Dam permanently and return the area to its natural state
  • The Township's current plans to breach the dam do not include modifying the culvert and drainage system under Greenhill Road. This still leaves the potential for the road to be damaged during a significant rain event.
  • While grant money through the USDA-NCRS was awarded to East Goshen Township to cover the cost to breach the dam, other options exist and should be considered.
  • The East Goshen Township Board of Supervisors meets on 8/18/09 at 8:00 PM to vote on whether or not to accept the NCRS Grant.
  • Guidelines for the NCRS Grant include an aggressive timeline for permit application, design, and construction with a target completion date of October 1, 2010.
  • More time is needed to investigate additional funding sources for saving the dam. Presently, State funding is being pursued.
  • The Board of Supervisors needs to vote “No” on 8/18/09 in order to have more time to save our local landmark. Contact the Supervisors at egtadmin@eastgoshen.org or (610) 692-7171 and ask them to “Vote No!”

8/8/2009 For more information please visit www.savethedam.org

Page 1 of 1

Smith, Rick

From: Peggy Mahan [peggyjmahan@verizon.net]
Sent: Saturday, August 08, 2009 5:54 PM
To: rsmith@eastgoshen.org
Subject: dam project

I am a resident of Hershey's Mill and I am totally against removing any portion of the beautiful dam, a peaceful place for artists and passersby.

Peggy J. Mahan
363 Devon Way
West Chester, PA 19380
peggyjmahan@hotmail.com
peggyjmahan@verizon.net

Have a nice day!

8/10/2009

Page 1 of 1

FYI

Smith, Rick

From: Rick Smith [rsmith@eastgoshen.org]
Sent: Monday, August 10, 2009 4:25 PM
To: 'jhsewell@comcast.net'
Subject: RE: Hershey's Mill Dam

Mr. Sewell

Thank you for your e-mail. I will give a copy of your e-mail to each Supervisor.

Unfortunately, DEP has mandated that the Township “do something” with the Hershey Mill Dam.

Rick Smith
Township Manager

From: Morgan, Joanne
Sent: Monday, August 10, 2009 3:24 PM
To: Smith, Rick
Subject: FW: Hershey's Mill Dam

From: James Sewell [mailto:jhsewell@comcast.net]
Sent: Monday, August 10, 2009 3:04 PM
To: egtadmin@eastgoshen.org
Subject: Hershey's Mill Dam

I strongly disapprove of the proposal to breach the Hershey's Mill Dam. I cannot believe that this is a high priority, since it has served many years without a problem. Merely because projects must be launched to justify “stimulus” money (i.e., taxpayer backed) does not mean that an historic feature should be destroyed. Please use your judgment before destroying an irreplaceable object.

James H Sewell
1539 Tanglewood Drive
Hershey's Mill Estates
West Chester, PA 19380
(610) 640-0218
jhsewell@comcast.net

Page 1 of 1

FYI
8/10/09

Smith, Rick

From: Rick Smith [rsmith@eastgoshen.org]
Sent: Monday, August 10, 2009 7:37 AM
To: 'Jackenbach@aol.com'
Subject: RE: Hershey's Mill Damn

Mr. Rickenbach

Thank you for your e-mail.

I will give a copy to each Supervisor.

Rick Smith, Township Manager
East Goshen Township

From: Jackenbach@aol.com [mailto:Jackenbach@aol.com]
Sent: Monday, July 27, 2009 11:42 AM
To: rsmith@eastgoshen.org
Subject: Hershey's Mill Damn

Louis:

I think it would be a mistake to breach the dam. How many historical sites are still left in E. Goshen? Surely the dam is one of the most scenic of them all. Just look at the photos on your own web site.

If there are 17,000 residents of E. Goshen Twnshp, it would cost $16.50 per person to raise the $280,000 required. If every resident contributed $10, you would have 170,000 - surely there are other ways to raise the additional money needed.

It would be short sighted to lose the dam!

Jack Rickenbach
1558 Tanglewood Drive

An Excellent Credit Score is 750. See Yours in Just 2 Easy Steps!

8/10/2009

Page 1 of 1

Morgan, Joanne

From: Evrt61@aol.com
Sent: Friday, August 14, 2009 11:29 AM
To: egtadmin@eastgoshen.org
Subject: Hershey's Mill Dam

Dear Supervisors:

Please vote "NO" on the 18th to give yourselves more time to explore other options to breaching the dam and alternative funding to accomplish saving the dam. We need to save historic and scenic landscaping and Hershey's Mill Dam certainly qualifies as a "postcard quality" scene. It is also "public" and not hidden away somewhere.

Thank you for your thoughtful considerations on saving the dam and a bit of history.

Everett and Rae Ann Marsh

8/14/2009

Page 1 of 1

Morgan, Joanne

From: Smith, Rick
Sent: Wednesday, August 12, 2009 2:57 PM
To: Morgan, Joanne
Subject: RE: SAVE THE HERSHEY'S MILL DAM

Ms. Robertson

Thank you for your e-mail.

I will give a copy to each Supervisor.

Rick Smith
Township Manager

From: Morgan, Joanne
Sent: Tuesday, August 11, 2009 1:17 PM
To: Smith, Rick
Subject: FW: SAVE THE HERSHEY'S MILL DAM

From: dodierob@verizon.net [mailto:dodierob@verizon.net]
Sent: Tuesday, August 11, 2009 12:13 PM
To: egtadmin@eastgoshen.org
Subject: SAVE THE HERSHEY'S MILL DAM

VOTE NO on August 18th! Save oour history!

Dodie Robertson
1522 Tanglewood Dr
West Chester PA 19280

8/13/2009

Page 1 of 1

Morgan, Joanne

From: joseph mussari [joemussari@yahoo.com]
Sent: Wednesday, August 12, 2009 11:01 PM
To: egtadmin@eastgoshen.org
Subject: Hershey's Mill Dam

Hello Gentlemen,

I am writing to you with respectful plea to reconsider tearing down the Hershey's Mill Dam.

As you may know, our family have been residents of East Goshen for almost 3 decades. Almost a century ago, our neigborhood, Wineberry Lane, was a part of the Hershey Mill Dam history. Logs from the Mill floated behind our home, heading for the logging camp. But the dam is a part of all of us. It's a part of our rich & historic past & for many families, it's the place where our children first tossed a fishing line. It is also one of the last dam/waterfalls in Chester County. It is a landmark of beauty & time of past.

Please do not destroy this beautiful piece of history. As I stated earlier, it is a part of all of us.

Thank you,
Tina Mussari

8/13/2009

Page 1 of 1

Morgan, Joanne

From: Dick McCabe [mccaber@comcast.net]
Sent: Wednesday, August 12, 2009 7:38 PM
To: egtadmin@eastgoshen.org
Subject: Hershey Mill Dam

Dear Supervisors,

I would very much appreciate your making some effort to find a solution to the Hershey Mill Dam issue that does not require that the dam be breached. Show some leadership.

Best regards,

Richard McCabe
Patricia McCabe

1205 Burning Bush Lane
WC 19380
Hershey Mills Estates

8/13/2009

Page 1 of 1

Morgan, Joanne

From: velyd [velyd@comcast.net]
Sent: Wednesday, August 12, 2009 5:06 PM
To: egtadmin@eastgoshen.org
Subject: Same the dam

Please vote no to tearing down the beautiful Hershey's Mill Dam.
Diane S. Vely
50 Ashton Way
West Chester, PA 19380

8/13/2009

Hershey's Mill Dam

Page 1 of 1

Morgan, Joanne

From: Alan Milberg [amilb66@comcast.net]
Sent: Wednesday, August 12, 2009 4:26 PM
To: egtadmin@eastgoshen.org
Subject: Hershey's Mill Dam

Please vote “NO” . Do not tear down the Dam.

Alan Milberg

1502 Quaker Ridge

West Chester, PA 19380

The Segal Classic is back! September 25, 2009

Check out some of the great items being auctioned:

www.segalclassic.com

8/13/2009

Page 1 of 1

Morgan, Joanne

From: norgebell@verizon.net
Sent: Wednesday, August 12, 2009 2:21 PM
To: egtadmin@eastgoshen.org
Subject: save the dam

Supervisors:

Please vote to not accept federal money to tear the down the dam.

Thanks,

Martha Thompson

8/13/2009

Page 1 of 1

Morgan, Joanne

From: Beth Conley [bethjimconley@msn.com]
Sent: Wednesday, August 12, 2009 1:12 PM
To: egtadmin@eastgoshen.org
Subject: Hello

Hello,

Please vote no to tearing down the dam at Hershey's Mill.

Thank you,

Beth Conley --East Goshen resident --610-719-8157

8/13/2009

Morgan, Joanne

From: Laura Moore [lauramoore17@gmail.com]
Sent: Wednesday, August 12, 2009 1:12 PM
To: egtadmin@eastgoshen.org
Subject: Do Not Take The Dam!

This is a beautiful place that me and my family have always enjoyed seeing – it keeps a nature feel to the area. I actually was thinking of getting my wedding pictures here next year.

please do not take this away from us all

Laura Moore

1

HERSHEY'S MILL DAM SURVEY

On August 18th East Goshen Township Board of Supervisors will be voting to accept federal money to breach Hershey’s Mill Dam. Residents will be calling in to vote yes accept the grant money to breach the dam or vote no not to accept money and save the dam.

NAME ADDRESS NO YES
Elizabeth Krusko 152 Chandler Drive X
Sue Puffer 1493 Quaker Ridge X
John Lewis 20 Chandler Drive X
Carol Vandergast 477 Eaton Way X
James & Carol Lewis 697 Inverness Drive X
Naomi Jackson 109 Ashton Way X
Alec Kelley 154 Chandler Dr. X
Julia Sweeney 25 Chandler Dr. X
Jane Hutchison 392 Eaton Way X
Mr. & Mrs. Applegate 414 Eaton Way X

1:30 p.m. 8/14/09

Hershey Mill Dam Resident Input

Tracy Riegel 1212 Hadleigh Drive save dam
Mark Clemens 616 696 5165 save dam
Dianna Dujmich 610 431 2110 save dam
Murial Hill 610 431 6347 save dam
Dillard Jordan 610 738 0249 undecided

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Resident input for August 18th meeting.doc

Page 1 of 1

Smith, Rick

From: Morgan, Joanne
Sent: Tuesday, July 28, 2009 1:12 PM
To: Smith, Rick; Gill, Joe
Subject: FW: Hersheys Mill Dam discussion Attention Rick Smith

From: DELVALCO@aol.com [mailto:DELVALCO@aol.com]
Sent: Tuesday, July 28, 2009 10:48 AM
To: egtadmin@eastgoshen.org
Subject: Hersheys Mill Dam discussion Attention Rick Smith

Thanks for notice of August 18 meeting on subject. You may remember I spoke at last meeting as retired mechanical engineer and that i had run flow calculations to prevent.overflow . They were Not conclusive but should be my background makes me confident of success at lower cost thanany of the displayed suggestions. It is so hard in todays world to save this situation that I want to at least give you my final reccommendation!

I believe that the present sluice ( of size 2' x 22 ') should be widened on each side by 10' and lowered by 1 '
THIS WOULD PREVENT DAM FAILURE, NOT COST OVER $80000 AND WOULD NOT EFFECT APPEARANCE YET INSURE NO OVERFLOW ON REMAINDER OF DAM....To be sure simply placement of boulders along the rest of the dam would insure containment.

Yours truly Robert Schaefer at 5 Hersheys Dr W. C.19380      phone 436 0167

An Excellent Credit Score is 750. See Yours in Just 2 Easy Steps!

8/10/2009

HERSHEY'S MILL DAM SURVEY

On August 18th East Goshen Township Board of Supervisors will be voting to accept federal money to breach Hershey’s Mill Dam. Residents will be calling in to vote yes accept the grant money to breach the dam or vote no not to accept money and save the dam.

NAME ADDRESS NO YES
Elizabeth Krusko 152 Chandler Drive X
Sue Puffer 1493 Quaker Ridge X
John Lewis 20 Chandler Drive X
Carol Vandergast 477 Eaton Way X
James & Carol Lewis 697 Inverness Drive X
Naomi Jackson 109 Ashton Way X
Alec Kelley 154 Chandler Dr. X
Julia Sweeney 25 Chandler Dr. X
Jane Hutchison 392 Eaton Way X
Mr. & Mrs. Applegate 414 Eaton Way X

1:30 p.m. 8/14/09