Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Board of Supervisors\2016\062816.doc

AGENDA EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS Tuesday, June 28, 2016

7:00 PM

Meeting will be held at the Goshen Fire House, 1320 Park Avenue

1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chairman’s Report 6. Public Hearing - none 7. Emergency Services Reports WEGO – none Goshen Fire Co. - none Malvern Fire Co – none Fire Marshal – none 8. Financial Report – none 9. Old Business - none 10. New Business a. Hershey Mill Dam March 17, 2016 – Memo May 13, 2016 – Gannett Fleming letter Additional Information is available under the About Us tab at www.eastgoshen.org b. Milltown Dam March 22, 2016 – Excerpt from Presentation Additional Information is available under the About Us tab at www.eastgoshen.org 11. Any Other Matter 12. Approval of Minutes - none 13. Treasurer’s Report - none 14. Correspondence, Reports of Interest 15. Public Comment – Hearing of Residents 16. Adjournment The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant. Dates of Importance Jun 28, 2016 Applebrook Golf 1:00 pm Jun 28, 2016 Board of Supervisors (Special Meeting) 7:00 pm Jun 30, 2016 Farmers Market at Park 3:00 pm Jul 05, 2016 Board of Supervisors 7:00 pm Jul 06, 2016 Planning Commission 7:00 pm Jul 07, 2016 Farmers Market at Park 3:00 pm Jul 07, 2016 Chester County Band (Amphitheater) 6:00 pm

F:\Data\Shared Data\Agendas\Board of Supervisors\2016\062816.doc

Jul 11, 2016 Municipal Authority 7:00 pm Jul 12, 2016 ABC’s of Science at Park 10:00am Jul 13, 2016 Conservancy Board 7:00 pm Jul 14, 2016 Farmers Market at Park 3:00 pm Jul 19, 2016 Peter Pan at Park 10:00am Jul 19, 2016 Board of Supervisors 7:00 pm Jul 20, 2016 Moliere's Tartuffe at Amphitheater 6:300pm Jul 20, 2016 Futurist Committee 7:00 pm Jul 21, 2016 Farmers Market/Car Cruise at Park 3:00 pm (Market)/5:00 pm (Car Cruise) Jul 24, 2016 A Midsummer's Night's Dream at Amphitheater 4:00pm Jul 26, 2016 Magical Illusions 10:00am Newsletter Deadlines for Summer of 2016: May 2, 2016

Memo East Goshen Township

Date: March 17, 2016 To: Board of Supervisors From: Rick Smith, Township Manager Re: Hershey Mill Dam

The attached worksheet outlines the cost to:

• Improve Spillway so that the dam will pass the design storm, • A Partial Breach {lowering the existing concrete spillway by six feet) as suggested by PADEP, • A Full Breach

Under the Improve Spillway option, we would be responsible for all of the typical costs associated with operating and maintain a dam.

If we went with the Partial Breach and Full Breach options we would still incur some expense to maintain the lowered dam or the open space.

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\2016\Memo 031716.docx

Option

Improve Spillway

Partial Breach

Full Breach

Comments Design/Pe rm it

Bidding

Construction

Inspection

Contingency

Yearly Costs

Hershey Mill Dam 30 Vear Life Costs 6/23/2016

Design/Permit Bidding Construction Inspection Contingency Total Yearly 30Year Cost

Inspection 5%of 10%of and/or Construction Construction Maintenance

$37,160 $3,300 $302,025 $15,101 $30,203 $387,789 $4,000 $458,054

$11,100 $3,300 $96,456 $4,823 $10,756 $126,434 $2,000 $266,965

$11,100 $3,300 $97,674 $4,884 $10,877 $127,835 $2,000 $268,366

See 2/3/12 proposal for Improve Spillway cost. This work has been completed and we have a permit

See 12/29/15 proposal for Partial Breach cost

Based on 3/16/16 conversation with Adam ok to use Partial Breach estimate for Full Breach

See 8/27 /14 proposal for bidding costs

See 3/16/16 cost estimate

Based on 3/16/16 conversation with Adam use 5% of construction cost

Based on 3/16/16 conversation with Adam use 10% of Construction Cost since we have the plans and permit for the Improve Spillway Option

Based on 3/17 /16 conversation with Adam use 10% of Design/Permit and Construction Cost since we do not have the plans and permit for the Partial Breach or Full Breach Options.

Assume Annual Inspection @ $2,000 & Routine Maintenance @ $2,000 for Improve Spillway Option

Assume Routine Maintenance @ $2,000 for Partial Breach and FullBreach Options

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\2016\Copy of HM DAm 031716-JA 30yr.xlsx

(

(

(

., , l. ...... _

--=-~~~~! - - .. ~~·..!4...-:- ';'·c. . ·..:--;

~ 6annett Fleming MAY 1 3 2016

I Excellence Delivered As Promised I ----- J == .. ~,, ~:,~- ---==.. .-"""-=.,,,I

May 13, 2016

Mr. Rick Smith, Jr., Township Manager East Goshen Township

1580 Paoli Pike West Chester, PA 19380-6199

Dear Mr. Smith,

Subject: Dam Related Engineering Services for East Goshen Township Hershey Mill Dam (DEP ID No. DlS-125) Construction Cost Review

East Goshen Township (Township) is currently in the process of evaluating alternatives for either modifying or breaching Hershey Mill Dam (DEP ID No. D15-125). Preliminary cost estimates for three options were provided to the Township in an April 6, 2016 letter from Edward B. Walsh & Associates. As requested by the Township, Gannett Fleming reviewed information provided for each option and is providing an opinion on the construction costs and feasibility of the three options. The three options being considered are described below.

Option 1 - New Auxiliary Spillway. Includes adding a 58-foot-wide auxiliary spillway adjacent to the existing 22-foot-wide principal spillway and raising the top of dam by as much as 1.5-feet in some areas to elevation 450.5 in order to convey the 100-year flood without overtopping the embankment. The crest of the new auxiliary spill way will be four inches higher than the crest of the principal spillway. The Township has secured a permit from the Pennsylvania Department of Environmental Protection (DEP), Division of Darn Safety for this option. The permit was issued on July 7, 2014. The construction cost prepared by Edward. B. Walsh & Associates for this option is $302,025.

Option 2 - Lower Principal Spillway. Option 2 involves lowering the crest of the principal

spillway 6 feet and removing upstream sediment deposits as needed by excavating pilot channels through the reservoir to direct flows towards the spillway. The constrnction cost prepared by Edward. B. Walsh & Associates for this option is $96,456.

Option 3 - Decommission Dam. Option 3 involves breaching the embankment down to the natural streambed and re-establishing the stream channel through the sediment deposits in the reservoir. The construction cost prepared by Edward. B. Walsh & Associates for this option is $97,674.

Gannett Fleming, Inc.

P.O. Box 67100 • Harrisburg, PA 17106-7100 J 207 Senate Avenue• Camp Hill, PA 17011-2316

t: 717.763.7211. f: 717.763.8150

www.gannettfleming.com

j

Eiannet.t /Fleming Mr. Rick Smith East Goshen Township

2

DOCUMENTS PROVIDED FOR REVIEW:

May 13, 2016

The opinions provided within this letter were developed based information presented in the following documents:

s Letter from Edward B. Walsh & Associates, Inc., dated April 6, 2016 containing a breakdown of the estimated construction costs for Options 1, 2 and 3.

e Construction drawings (six sheets) entitled "Restoration Plan for Hershey's Mill Dam" as prepared by Edward B. Walsh & Associates, last revised June 11, 2014.

• Dam Permit issued by DEP, Division of Dam Safety on July 15, 2014.

• East Goshen Township Memo by Rick Smith dated March 17, 2016.

Only Option 1 has been advanced to the point where permits have been obtained. No drawings, concept sketches, or construction quantities for Options 2 and 3 have been provided.

GANNETT FLEMING OPINIONS

Option 1 - New Auxiliary Spillway. ill the absence of supporting calculations for the new auxiliary spillway shown on the drawings prepared by Edward B. Walsh & Associates, there appear to be certain components of the design that may require additional investigation. Based on our cursory review of the information provided, the following provides our opinion on the estimated construction cost and areas where additional detail may be needed.

~ Risk of Flood Damage During Construction: The construction cost estimate includes

$17,550 for water control during construction of which $12,350 consists of pumping the stream(s) around the work area or over the existing spillway for a period of up to 1 month. The proposed pumping system would need to be operated continuously for at least a month. The specified cost appears to be very low for this critical work item. In addition, diversion and care of water for dam projects carries substantial risk, and this risk is normally transferred to the Contractor, since the contractor controls the site and the means and measures to divert the flow through the work area. The risk associated with providing diversion and care of water during construction does not appear to be reflected in the current construction cost estimate. It is likely that during the construction period, a heavy rainfall will occur that will exceed the capacity of the proposed pumping system and flood the construction site. In addition to damaging work in progress, there is the potential to damage the adjacent dam features and/or cause sediment deposits within the reservoir to be flushed downstream. Any changed conditions encountered during construction, or bad weather, could also delay the project and extend the time needed to pump the flow around the work area.

Gannett !Fleming Mr. Rick Smith East Goshen Township

3 May 13, 2016

);>- Dewatering the Site: Construction of the proposed auxiliary spillway involves placement

of a concrete slab on a suitable foundation. In order for this to take place, the foundation excavation must be fully dewatered and dry. This is typically accomplished through the use of sump pits and/or groundwater dewatering wells. Foundation dewatering does not appear to be reflected in the current cost estimate.

' );>- Unknown Foundation Conditions: No subsurface or foundation information for the new

Auxiliary spillway is provided on the drawings. It is unclear if subsurface investigations have been performed to sample foundation materials, locate bedrock and classify the soils located within/under the proposed auxiliary spillway. Therefore the foundation conditions for the auxiliary spillway appear to be unknown. Understanding the foundation conditions for the auxiliary spillway is important. If the spillway is founded on erodible overburden material, which appears to be the case, the auxiliary spillway design should include a seepage analysis and would likely require a seepage cutoff wall and filtered drain system to control seepage under the structure and prevent a piping failure. If the auxiliary spillway structure is founded on bedrock, foundation treatment would include additional excavation and effort to clean and inspect the foundation rock, and place backfill concrete to the desired foundation grade.

);>- Seepage, Collection and Filter System: The drawings indicate the addition of a short filter diaphragm at the left end of the proposed spillway to collect seepage which may occur around the left end of the spillway. No seepage collection and filtering system is shown for seepage under the spillway. It is recommended that this feature be considered in the design, especially if the auxiliary spillway is founded on erodible material.

);>- Fill Materials, Placement, Compaction and Testing: The drawings indicate that material

removed from the embankment to construct the spillway expansion will be stockpiled and reused to backfill the spillway. While this appears to be a reasonable approach, no information is provided to confirm if this material is suitable as "impervious" backfill. Pending soil test results, offsite "impervious" material may need to be imported to the site at an additional cost. No information on fill placement, compaction and testing requirements could be found within the information provided.

);>- Sheet Pile Wall Details: The design shows placement of a steel sheet pile wall running upstream-downstream through the embankment along the left side of the principal spillway to support the excavation for the new auxiliary spillway. It is assumed that the sheet pile wall will remain in place at the completion of the project. The placement of this sheet pile wall will create a potential seepage path through the embankment. Seepage treatment details for the sheet pile wall are not shown on the drawings.

);>- Stone Facade Details: The downstream face of the proposed spillway contains a vertical

concrete wall that is to be treated with a stone facade to match the appearance of the existing spillway. Information such as the thickness of the stone facade, how the facade will be anchored to the vertical concrete wall, etc. are not clearly evident from the information provided. Such details may impact the cost of the facade and may also

6annett Fleming Mr. Rick Smith East Goshen Township

4 May 13, 2016

necessitate modifications to the spillway cross section (i.e., additional detail needed for the concrete foundation that supports the facade and the length that the spillway crest slab overhangs the facade).

~ Concrete Details: The proposed spillway is to be comprised of a concrete foundation

slab, a vertical concrete wall at the downstream face of the spillway, a concrete slab for energy dissipation downstream of the spillway and a concrete slab to form the crest of the spillway. Given the length and width of the proposed concrete features, construction and expansion joints with waterstops will be required to control cracking of the concrete and seepage through the structure.

~ Potential for Changed Conditions: Rehabilitation of existing dams often includes working with limited information, especially when as-built records and subsurface information are not available for the structure. During excavation for the proposed modifications, unanticipated features and conditions can be encountered that can substantially impact the intended design or require additional modifications to the dam. The Township should include a contingency in their budget for this option to address the potential for changed conditions. Contingencies in the range of 20 to 30 percent are

appropriate for the unknowns associated with Option 1.

Based on the above, the current estimate of $302,025 appears low for Option 1.

Option 2 - Lower Principal Spillway. Without a detailed design, construction quantities, or a detailed description of what is included in Option 2, we are unable to determine if the construction cost estimate of $97,000 is reasonable. However, we offer the following opinions related to unit costs, many of which are applicable to Options 1, 2 and 3:

~ Mobilization and Demobilization: These costs are typically assumed to be approximately

seven (7) percent of the construction cost. The mobilization costs provided in the estimates are in the vicinity of one (1) percent.

~ Excavation Costs: Excavation costs for common earth normally range between $5 and

$20 per cubic yard depending on the volume of material, type of equipment used, and haul distance for spoiling the material. Excavation costs provided in the estimate assume

a unit cost of $5 per cubic yard. We would also anticipate an additional cost to spoil, compact, grade and stabilize the material once it is at its final destination. Onsite spoiling costs may be in the range of $5 to $10 per cubic yard of material.

~ Erosion and Sediment Control Costs: The erosion and sediment control costs appear to

be reasonable for the scale of the project.

~ Potential for Changed Conditions: As discussed under Option 1, rehabilitation of existing dams often includes working with limited information, especially when as-built records and subsurface information are not available for the structure. During excavation for the proposed modifications, unanticipated features and conditions can be encountered

fiiJJnnett /Fleming Mr. Rick Smith East Goshen Township

5 May 13, 2016

that can substantially impact the intended design or require additional modifications to the dam. The Township should include a contingency in their budget for this option to address the potential for changed conditions. Contingencies in the range of 30 percent are appropriate for conceptual designs. The cost estimate provided within the Edward B. Walsh & Associates letter dated April 6, 2016 contains a contingency of approximately

14 percent. Given the above, we would recommend increasing the contingency.

Assuming the items/quantities listed in the Option 2 cost estimate are reasonable and comprehensive of the project, the construction cost estimate of $97,000 appears low based on the observations listed above.

Option 3 - Decommission Dam. Similar to Option 2, without a detailed design, construction quantities, or a detailed description of what is included in Option 3, we are unable to determine if the construction cost estimate of $97 ,000 is reasonable. However, the comments offered with respect to Option 2 also apply to Option 3. In our opinion, the main uncertainty and risk

associated with Option 3 is the control of water and the management of the reservoir sediment. The construction cost estimate has allocated $11, 7 60 for the control of off site runoff through the work area. Depending on the methods used and the length of time for which these facilities must be maintained, these costs may be low. The volume of sediment to be removed and the location where the sediment will be spoiled will significantly influence the construction costs. It is our understanding that sediment sampling performed by URS in 2008 found the reservoir sediments to be "clean"; therefore, the reservoir sediments can be spoiled onsite. Assuming the items/quantities listed in the Option 3 cost estimate are reasonable and comprehensive of the project, the construction cost estimate of $97,000 appears low based on the observations listed above.

An option that does not appear to have been considered is to lower the entire dam to the point where it is no longer a regulated structure and retains the reservoir sediment. This approach may be less expensive than decommissioning the dam if removal of substantial sediment deposits is required.

In summary, it is our opinion that the construction cost estimates for Options 1, 2 and 3 are on the low side. The cost for Option 3, however, may be diminished by obtaining outside funding through a grant or if the project is used to mitigate environmental impacts for another project.

(

(

15arunettRemlng Mr. Rick Smith East Goshen Township

6 May 13, 2016

If you have any questions or need additional information, please do not hesitate to call me or Paul Schweiger at 717-763-7212, extensions 2828 and 2504, respectively. _.,

Sincerely,

GANNETT FLEMING, INC. Environmental Resources Division ~Cl.rlJ

ERIC C. NEAST, P.E. Project Manager Dams and Hydraulics Section

EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA MILLTOWN DAM (DEP ID NO. 015-146)

EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS MEETING

~ fiannett Fleming MARCH 22, 2016

ALTERNATIVE 1
INCREASE EMBANKMENT HEIGHT

3D rendering of dam and spillway with increased embankment height.

ALTERNATIVE 2
INCREASE SPILLWAY WIDTH

3D rendering of dam with increased spillway width.

ALTERNATIVE 3 RAISE EMBANKMENT AND WIDEN SPILLWAY

ALTERNATIVE 4
FUSEGATES

[3D rendering showing Alternative 4 with fusegates installed on the central spillway crest of the dam, flanked by concrete sidewalls, riprap-covered earthen embankments, and safety railings.]

ALTERNATIVE 5
WIDEN SPILLWAY WITH LABYRINTH

3D rendering of dam with widened labyrinth spillway.

ALTERNATIVE 6 ACB EMBANKMENT OVERTOPPING PROTECTION

ALTERNATIVE 7 RCC EMBANKMENT OVERTOPPING PROTECTION

ALTERNATIVE 8
DECOMMISSION DAM

3D rendering of decommissioned dam site with restored stream channel.

Design/Construction Costs: $3.1 Million

ALTERNATIVE 9 PARTIAL BREACH - REDUCED HAZARD CLASS?

ALTERNATIVE 10 PARTIAL BREACH - REDUCE HAZARD CLASS!

Table 10-3 Summary of 30-Y ear Life Cycle Costs

Alternative Initial Project 30-Year Dredging 30-Year Description Costn> O&M Costs(2) CostsC3) Total Cost

$7.2 to $8.3 Increase Capacity Alternative 1 $6.6 Million $0.6 Million $1.1 Million Million Increase Spillway Depth

$10.2 to Increase Capacity Alternative 2 $9.6 Million $0.6 Million $1 .1 Million $11.3 Million Increase Spillway Width

. $7.4 to $8.5 Increase Capacity Alternative 3 $6.8 Million $0.6 Million $1.1 Million Million Increase Spillway Width & Depth

$6.4 to $7.5 Increase Capacity Alternative 4 $5.8 Million $0.6 Million $1.l Million Million Fuse gates

$7.3 to $8.4 Increase Capacity Alternative 5 $6.7 Million $0.6 Million $1 .1 Million Million Widen Spill way with Labyrinth Increase Capacity Alternative 6 $0.7 Million $1.1 Million $3.9 to $5.0