Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Agendas\Board of Supervisors\2016\111516 for web.doc
AGENDA EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, November 15, 2016
1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chairman’s Report a. Acknowledge receipt of Township Solicitors opinion regarding the constitutionality of asking “is anyone recording the meeting?” b. Announce that the Board of Supervisors will consider adopting the 2017 Budget at their meeting on December 6, 2017. c. Announce that the Hershey Mill Dam Committee will hold a meeting on December 5, 2016 to solicit public comment on what should be done with the area above the dam after the dam is breached. d. Announce that on November 14, 2016 WEGO Officer Jonathan Stafford was promoted to Sergeant and Kennith Frascella and Ryan Herman were promoted to full time officers. 6. Public Hearing – The Board will conduct a public hearing to amend Sections 188-11 and 194-11 of the Township Code concerning the due dates for sewer and refuse bills. 7. Emergency Services Reports WEGO – none Goshen Fire Co - none Malvern Fire Co – none Fire Marshal – 1611 Margo Lane 8. Financial Report – November 8, 2016 Report 9. Old Business 10. New Business a. Consider escrow release for 1662 East Boot Road Lot #1 b. Consider request to sell Christmas Trees at 1301 West Chester Pike. c. Consider Playground Renovation Project, Status Update. 11. Any Other Matter 12. Approval of Minutes a. October 18, 2016 b. November 1, 2016 c. November 3, 2016 13. Treasurer’s Report – October 27, 2016 14. Correspondence, Reports of Interest a. 10/31/16 letter from Verizon b. 11/3/16 e-mail from Joe Buonanno concerning the Paoli Pike Trail c. Sunoco Station 3rd Quarter Remedial Action Progress Report 15. Public Comment – Hearing of Residents 16. Adjournment
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda
F:\Data\Shared Data\Agendas\Board of Supervisors\2016\111516 for web.doc
in order to accommodate the needs of other board members, the public or an applicant.
Dates of Importance
Nov 12, 2016 Neighbor to Neighbor Day 8:00am Nov 14, 2016 Municipal Authority 7:00pm Nov 15, 2016 Board of Supervisors 7:00pm Nov 16, 2016 Milltown Dam Committee 7:00pm Nov 16, 2016 Futurist Committee 7:00pm Nov 17, 2016 Hershey Mill Dam Committee 6:30pm Nov 30, 2016 Milltown Dam Committee 7:00pm Dec 05, 2016 Hershey Mill Dam Committee 7:00pm Dec 14, 2016 Milltown Dam Committee 7:00pm Dec 15, 2016 Milltown Dam Committee 7:00pm Dec 20, 2016 Board of Supervisors 7:00pm Dec 21, 2016 Futurist Committee 7:00pm
Newsletter Deadlines for Spring of 2017: February 1
Rick Smith
| From: | Ryan M. Jennings <[illegible]> |
|---|---|
| Sent: | Wednesday, November 02, 2016 2:55 PM |
| To: | Rick Smith |
| Cc: | Kristin Camp |
| Subject: | BOS Meeting |
Rick,
Kristin and I looked into the matter below regarding the recordings at public meetings. Based upon our research and analysis, we concluded that asking whether anyone is recording a public meeting is not unconstitutional. The Township, out of its own curiosity and/or the curiosity and comfort of the attending public, is entitled to pose the question regarding recordation.
As you're aware, Section 711 of the Sunshine Act allows a person attending a meeting of an agency to use recording devices to record all proceedings. Nothing in the Sunshine Act prohibits the agency from adopting and enforcing reasonable rules for the use of recording devices.
Case law interpreting this and certain other pertinent provisions of the Sunshine Act are scant. However, the case law that does exist, does not suggest that the Township is unable to pose such a question of the audience.
The case law cited by the resident, as far as we understand it, is based upon a California Supreme Court case of 2012 (People v. Tully) that entails a criminal matter, which entails Miranda rights, statements made, and suppressions of certain statements. The case does not suggest in any way that East Goshen Township cannot pose such a question. Moreover, a ruling by the California Supreme Court would not be the law of the land here in Pennsylvania. If reference was made or citation provided to some other case law, please let us know and we'll look into the matter further, as necessary.
Thanks,
Ryan
RYAN M. JENNINGS, ESQUIRE
p: 610.235.0230
f: 610.436.6179
w: www.buckleyllp.com
118 W. Market Street, Suite 300
West Chester, PA 19382-2928
BUCKLEY BRION
MCGUIRE & MORRIS LLP
THIS E-MAIL MESSAGE AND ANY FILES TRANSMITTED WITH IT ARE CONFIDENTIAL AND PRIVILEGED, AND ARE INTENDED SOLELY FOR THE USE OF THE INDIVIDUAL OR ENTITY TO WHOM IT IS ADDRESSED. IF THE READER IS NOT THE INTENDED RECIPIENT OR THE EMPLOYEE OR AGENT OF THE INTENDED RECIPIENT, YOU ARE HEREBY NOTIFIED THAT ANY DISSEMINATION OR COPYING OF THIS E-MAIL MESSAGE IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS E-MAIL MESSAGE IN ERROR, PLEASE NOTIFY ME IMMEDIATELY BY RETURN E-MAIL. ALSO, PLEASE DELETE THE MESSAGE FROM YOUR COMPUTER. THANK YOU.
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. - 2016
AN ORDINANCE OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, AMENDING CHAPTER 188 OF THE EAST GOSHEN TOWNSHIP CODE, TITLED, “SEWERS”, TO AMEND SECTION 188-11 REGARDING PENALTIES AND COLLECTION PROCEDURES FOR DELIQUENT SEWER BILLS AND AMENDING CHAPTER 194 OF THE EAST GOSHEN TOWNSHIP CODE TITLED, “SOLID WASTE”, TO AMEND SECTION 194-11 TITLED, “PENALTIES, LIENS AND COLLECTIONS” REGARDING PENALTIES AND COLLECTION PROCEDURES FOR DELIQUENT REFUSE BILLS.
BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, that the East Goshen Township Code shall be amended as follows:
SECTION 1. Chapter 188 of the East Goshen Township Code, titled, “Sewers”, Section 188-11.A shall be amended as follows:
“A. All sewer bills shall be payable on the due date. When the 45th day from the due date falls on either a weekend or a holiday on which the Township building is closed, payments that are received before the close of business on the next business day immediately following the 45th day shall be deemed to have been paid on time and no penalty shall be applied. If the sewer bill is not paid within 45 days of the due date, a penalty of 5% shall be added to the total amount of the bill. In addition, interest shall be applied to arrears at the rate of 5/6 of 1% per month, or fraction thereof, 45 days after the due date and every month thereafter.
SECTION 2. Chapter 194 of the East Goshen Township Code, titled, “Solid Waste”, Section 194-11.A shall be amended as follows:
“A. All refuse bills shall be payable on the due date. When the 45th day from the due date falls on either a weekend or a holiday on which the Township building is closed, payments that are received before the close of business on the next business day immediately following the 45th day shall be deemed to have been paid on time and no penalty shall be applied. If the refuse bill is not paid within 45 days of the due date, a penalty of 5% shall be added to the total amount of the bill. In addition, interest shall be applied to arrears at the rate of 5/6 of 1% per month, or fraction thereof, 45 days after the due date and every month thereafter.
SECTION 3. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality,
illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
SECTION 4. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 5. Effective Date. This Ordinance shall become effective in five days from the date of adoption.
ENACTED AND ORDAINED this _____day of _________________, 2016.
| ATTEST: | EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS |
|---|---|
| _________________________________ | _________________________________ |
| Louis F. Smith, Secretary | Senya D. Isayeff, Chairman |
| _________________________________ | |
| E. Martin Shane, Vice-Chairman | |
| _________________________________ | |
| Carmen Battavio, Member | |
| _________________________________ | |
| Charles W. Proctor, III, Esquire, Member | |
| _________________________________ | |
| Janet L. Emanuel, Member |
2
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. 2016- 45
A RESOLUTION ESTABLISHING THE PROCEDURE FOR
THE COLLECTION SEWER & REFUSE ACCOUNT FEES
BE IT RESOLVED THAT the East Goshen Township Board of Supervisors hereby establishes the following collection procedures for delinquent sewer and refuse accounts.
1. Pursuant to the East Goshen Township Code (specifically Chapter 188 titled “Sewers” and Chapter 194 titled “Solid Waste”) all bills are due within forty-five (45) days of the date of the bill. If the quarterly bill is not paid by the forty-fifth (45th) day after the date of the bill, East Goshen (the “Township”) will send the property owner(s) a late notice and impose a penalty of 5% of the amount owed. When the forty-fifth (45th) day falls on either a weekend or holiday on which the Township building is closed, payments that are received before the close of the business the next business day immediately following the forty-fifth (45th) day shall be deemed to have been paid on time and no penalty shall be applied.
2. If the quarterly bill is not paid by the forty-fifth (45th) day after the date of the bill, the Township will impose a penalty at the rate of 5% of the amount owed and interest at the rate of 5/6 of 1% or a fraction thereof of arrears annualized at ten percent (10%) per year.
3. If the property owner(s) fails to pay the quarterly bill for two consecutive quarters, the Township will send the property owner(s) a notice by United States First Class Mail that outlines the collection process including avoidance of attorney’s fees, when payment is expected and the options available to the property owner(s). The property owner(s) shall have thirty (30) days from the date of the letter to pay the balance due or establish a payment agreement.
4. If the property owner(s) fails to pay the balance due or enter into a payment agreement with the Township within 30 days from the aforementioned letter in paragraph 3 above, the account will be turned over to the Township (Solicitor) who will send the property owner(s) a letter by United States First Class Mail and certified mail return receipt requested advising them that the account is past due and that they have thirty (30) days from the date that they received the certified letter to pay the past due balance or a municipal lien will be filed with the Prothonotary’s Office of the Court of Common Pleas of Chester County against the property for the amount that is currently past due including any interest, penalties, attorney fees, administrative fees and filing costs.
5. If the property owner(s) has refused to accept or the certified mail has been unclaimed within thirty (30) days, the Solicitor will send the property owner(s) another letter by United States First Class Mail advising them that the account is past due and
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2016\2016-45 Sewer and Refuse Account Collections.doc
that they have ten (10) days from the date of the mailing of the aforementioned letter to bring the account current or a municipal lien will be filed for the amount that is currently past due including any interest, penalties, attorney’s fees, administrative fees and filing costs.
6. If payment is not received within thirty (30) days of the property owner(s)’s receipt of the letter sent pursuant to paragraph 4 above, or within ten (10) days of the date of the mailing of the letter sent pursuant to paragraph 5 above, the Solicitor will file a municipal lien for the amount that is currently past due including any interest, penalties, attorney’s fees, administrative fees and filing costs. The municipal lien will continue to accrue interest as stated above on any past due amount and any additional past due amounts will be added to the municipal lien. Any account that is liened and which the property owner(s) has made no attempt at payment will be separately liened at the new accumulated basis annually.
7. When a delinquent account exceeds Two Thousand Dollars ($2,000.00) and after due diligence as to the practicality of collecting the debt, Township staff may request the Township solicitor to file a writ of scire facias and proceed with executing on the lien to recover the amount that is currently past due, including any interest, penalties, attorneys fees, administrative fees and filing fees incurred in the collection of the account.
8. If and when the Township collects the full amount of the judgment, the Township will satisfy the municipal lien promptly.
9. In the event that the Township is notified by the Court of Common Pleas of an impending Sheriff Sale or other judicial sale of the property which is encumbered by municipal liens, the Township will immediately request that the Township Solicitor take the necessary steps to protect the Township’s lien as it relates to the sale of the property.
RESOLVED AND ADOPTED, this _____ day of __________________, 2016.
| ATTEST: | EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS |
|---|---|
| _________________________________ | _________________________________ |
| Secretary | |
| _________________________________ | |
| _________________________________ | |
| _________________________________ | |
| _________________________________ |
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2016\2016-45 Sewer and Refuse Account Collections.doc
Memo
| To: | Board of Supervisors |
|---|---|
| From: | Jon Altshul |
| Re: | October 2016 Financial Report & Year-End Projections |
| Date: | November 8, 2016 |
Net of pass-through accounts, as of October 31st the general fund had revenues of $8,403,133 and expenses of $8,425,850 for a year-to-date deficit of $22,716. Compared to the YTD budget, revenues were $346,541 over budget and expenses were $194,259 over budget for a favorable budget variance of $152,282. As of September 30th, the general fund balance was $4,682,711.
On the expense side, Parks and Recreation was $154,915 over-budget due to the timing of invoices paid to Gannett Fleming for the Milltown Dam study, tree work in the park and park fencing. Public Works was $210,777 over budget, due to the timing of repaving this year (earlier than in previous years), plus deferring the Supplee Valley slip-lining from 2015 to 2016 (we therefore bore two major storm water expenses this year: Supplee Valley and Forrest Lane). The remaining departments were under-budget.
On the revenue side, Earned Income Tax is now $42,275 under budget, a substantial improvement over the past two months. Real Estate Property Tax is $43,231 over budget due to a large interim payment. Real Estate Transfer Tax is now $71,611 over budget due to the sale of 905 Airport Road in September. Local Services Tax continues to be strong with a positive budget variance of $35,909.
Other funds
- The State Liquid Fuels Fund had $503,927 in revenues and $0 expenses. The fund balance is $504,127.
- The Sinking Fund had $36,918 in revenues and $737,753 in expenses. The fund balance is $5,566,626.
- The Transportation Fund had $12,990 in revenues and $0 in expenses. The fund balance is $1,074,202.
- The Sewer Operating Fund had $2,814,704 in revenues and $2,842,041 in expenses. The fund balance is $601,700.
- The Refuse Fund had $868,663 in revenues and $850,848 in expenses. The fund balance is $673,498.
- The Sewer Sinking Fund had $2,090 in revenues and $144,449 in expenses. The fund balance is $1,960,965.
- The Operating Reserve Fund had $2,805 in revenues and no expenses. The fund balance is $2,485,340.
- The Events Fund had $10 in revenues and no expenses. The fund balance is $45,025.
Year-end Projections
As of October 31st, I am projecting that the General Fund finishes the year with a surplus of $65,527, an improvement of $60,000 since last month. This improvement is due to three factors: 1) Real Estate Transfer Tax is up another $15,000 due to the unexpected sale of 905 Airport Road last month, as well as expected pending sales for the remainder of 2016; 2) Earned Income Tax can safely be increased by $35,000 due to a stronger than expected fall disbursements and 3) deferring $10,000 for the Paoli Pike Master Plan to 2017 (and increasing that line item accordingly for 2017; see “budget update” below)
The only change since last month for other funds is in the Sinking Fund related to the approval of the reroofing project at the 10/18/16 meeting.
Budget Update
The 2017 budget was advertised in the Daily Local News on November 4, 2016. It is scheduled for adoption on December 6.
Since November 1, I have made three amendments to the 2017 proposed budget:
1) Reducing the WEGO budget by $51,486 to reflect the WEGO proposed budget v1.7. The Police General Expense figure that appeared in the Township’s original November 1 budget reflected my own estimate of police costs, based on the best available information at the time.
2) Increasing Consultant costs (in Administration) by $10,000 to reflect that we will probably not incur any costs for the Paoli Pike Master Plan study until 2017 and the entire $70,000 will be incurred next year (rather than $10,000 in 2016 and $60,000 in 2017, as was originally envisioned).
3) Increasing Volunteer Firefighters’ Workers Comp by $7,062 to reflect the actual renewals from SWIF (the only carrier that covers volunteer firefighters), offset by a $3,611 increase in reimbursements from other municipalities.
Collectively, these changes will reduce the amount of general fund expenses to be paid by fund balance by $38,035.
EAST GOSHEN TOWNSHIP
2016 YTD & YEAR END PROJECTIONS GENERAL FUND
October 31, 2016
| Account Title | 2016 Budget | Y-T-D Budget | Y-T-D Actual | Budget-Actual Variance | 2016 Year-End Projection (Oct) | Y/E-Budget Variance |
|---|---|---|---|---|---|---|
| GENERAL FUND | ||||||
| EMERGENCY SERVICES EXPENSES | 4,345,656 | 3,828,279 | 3,643,233 | (185,046) | 4,159,413 | (186,243) |
| PUBLIC WORKS EXPENSES | 2,634,879 | 1,924,429 | 2,253,127 | 328,698 | 2,727,128 | 92,249 |
| ADMINISTRATION EXPENSES | 1,646,376 | 1,285,800 | 1,310,326 | 24,526 | 1,665,259 | 18,883 |
| ZONING/PERMITS/CODES EXPENSES | 538,192 | 447,745 | 334,646 | (113,099) | 400,716 | (137,476) |
| PARK AND RECREATION EXPENSES | 531,450 | 415,082 | 554,263 | 139,181 | 646,270 | 114,820 |
| TOTAL CORE FUNCTION EXPENSES | 9,696,553 | 7,901,335 | 8,095,596 | 194,261 | 9,598,787 | (97,766) |
| EMERGENCY SERVICES REVENUES | 67,595 | 57,570 | 52,053 | (5,517) | 61,279 | (6,316) |
| PUBLIC WORKS REVENUES | 974,509 | 343,803 | 461,725 | 117,922 | 1,138,226 | 163,717 |
| ADMINISTRATION REVENUES | 325,020 | 287,122 | 331,572 | 44,450 | 372,107 | 47,087 |
| ZONING/PERMITS/CODES REVENUES | 242,150 | 210,985 | 302,955 | 91,970 | 296,763 | 54,613 |
| PARK AND RECREATION REVENUES | 152,878 | 143,344 | 127,610 | (15,734) | 139,976 | (12,902) |
| TOTAL CORE FUNCTION REVENUES | 1,762,152 | 1,042,824 | 1,275,915 | 233,091 | 2,008,351 | 246,199 |
| NET EMERGENCY SERVICES EXPENSES | 4,278,061 | 3,770,709 | 3,591,180 | (179,529) | 4,098,134 | (179,927) |
| NET PUBLIC WORKS EXPENSES | 1,660,370 | 1,580,626 | 1,791,403 | 210,777 | 1,588,902 | (71,468) |
| NET ADMINISTRATION EXPENSES | 1,321,356 | 998,678 | 978,754 | (19,924) | 1,293,152 | (28,204) |
| NET ZONING/PERMITS/CODES EXPENSES | 296,042 | 236,760 | 31,691 | (205,069) | 103,953 | (192,089) |
| NET PARK AND RECREATION EXPENSES | 378,572 | 271,738 | 426,653 | 154,915 | 506,294 | 127,722 |
| CORE FUNCTION NET SUBTOTAL | 7,934,401 | 6,858,511 | 6,819,681 | (38,830) | 7,590,436 | (343,965) |
| DEBT - PRINCIPAL | 498,001 | 203,000 | 203,000 | 0 | 498,001 | 0 |
| DEBT - INTEREST | 150,270 | 127,255 | 127,253 | (2) | 150,270 | 0 |
| TOTAL DEBT | 648,271 | 330,255 | 330,253 | (2) | 648,271 | 0 |
| TOTAL CORE FUNCTION NET | 8,582,672 | 7,188,766 | 7,149,934 | (38,832) | 8,238,707 | (343,965) |
| NON-CORE FUNCTION REVENUE | ||||||
| EARNED INCOME TAX | 4,921,500 | 3,972,870 | 3,930,595 | (42,275) | 4,850,000 | (71,500) |
| REAL ESTATE PROPERTY TAX | 1,997,165 | 1,971,136 | 2,014,367 | 43,231 | 2,023,658 | 26,493 |
| REAL ESTATE TRANSFER TAX | 525,000 | 437,500 | 509,111 | 71,611 | 580,000 | 55,000 |
| CABLE TV FRANCHISE TAX | 467,747 | 350,810 | 352,531 | 1,721 | 469,000 | 1,253 |
| LOCAL SERVICES TAX | 320,000 | 255,950 | 291,859 | 35,909 | 348,000 | 28,000 |
| OTHER INCOME | 28,076 | 25,502 | 28,755 | 3,253 | 33,576 | 5,500 |
| TOTAL NON CORE FUNCTION REVENUE | 8,259,488 | 7,013,768 | 7,127,218 | 113,450 | 8,304,234 | 44,746 |
| NET RESULT | (323,184) | (174,998) | (22,716) | 152,282 | 65,527 | 388,711 |
SUMMARY OF FUNDS REPORT (AKA “JOE REPORT”)
ALL FUNDS OCTOBER 2016
* NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
| GENERAL FUND* | LIQUID FUELS STATE FUND | SINKING FUND | TRANSPORT. FUND | SEWER OP. FUND | REFUSE FUND | SEWER SINK FUND | OPERATING RESERVE | EVENTS FUND | TOWNSHIP FUNDS | MUNICIPAL AUTHORITY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01/01/16 BEGINNING BALANCE | $4,803,331 | $200 | 6,267,461 | 1,061,213 | 629,037 | 655,683 | $2,103,325 | $2,482,535 | $45,015 | $18,045,508 | $1,461,276 |
| RECEIPTS | |||||||||||
| 310 TAXES | $7,151,134 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $7,151,134 | $0 |
| 320 LICENSES & PERMITS | $77,817 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $77,817 | $0 |
| 330 FINES & FORFEITS | $91,911 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $91,911 | $0 |
| 340 INTERESTS & RENTS | $107,163 | $480 | $36,918 | $2,065 | $595 | $894 | $2,090 | $2,805 | $10 | $153,021 | $1,803 |
| 350 INTERGOVERNMENTAL | $135,796 | $503,447 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $639,243 | $0 |
| 360 CHARGES FOR SERVICES | $770,086 | $0 | $0 | $0 | $2,814,109 | $867,769 | $0 | $0 | $0 | $4,451,964 | $50,428 |
| 380 MISCELLANEOUS REVENUES | $1,122,237 | $0 | $0 | $10,925 | $0 | $0 | $0 | $0 | $0 | $1,133,162 | $564 |
| 390 OTHER FINANCING SOURCES | $297,238 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $297,238 | $77,000 |
| $9,753,382 | $503,927 | $36,918 | $12,990 | $2,814,704 | $868,663 | $2,090 | $2,805 | $10 | $13,995,489 | $129,795 | |
| EXPENDITURES | |||||||||||
| 400 GENERAL GOVERNMENT | $981,191 | $0 | $20,044 | $0 | $0 | $0 | $144,449 | $0 | $0 | $1,145,684 | $0 |
| 410 PUBLIC SAFETY | $5,190,102 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $5,190,102 | $0 |
| 420 HEALTH & WELFARE | $6,000 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $6,000 | $0 |
| 426 SANITATION & REFUSE | $97,131 | $0 | $0 | $0 | $1,944,588 | $850,848 | $0 | $0 | $0 | $2,892,566 | $136,919 |
| 430 HIGHWAYS,ROADS & STREETS | $1,995,437 | $0 | $147,738 | $0 | $0 | $0 | $0 | $0 | $0 | $2,143,175 | $0 |
| 450 CULTURE-RECREATION | $517,151 | $0 | $477,107 | $0 | $0 | $0 | $0 | $0 | $0 | $994,257 | $0 |
| 460 CONSERVATION & DEVELOPMENT | $2,147 | $0 | $92,864 | $0 | $0 | $0 | $0 | $0 | $0 | $95,011 | $0 |
| 470 DEBT SERVICE | $352,247 | $0 | $0 | $0 | $820,454 | $0 | $0 | $0 | $0 | $1,172,701 | $0 |
| 480 MISCELLANEOUS EXPENDITURES | 728,006.10 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $728,006 | $0 |
| 490 OTHER FINANCING USES | $0 | $0 | $0 | $0 | $77,000 | $0 | $0 | $0 | $0 | $77,000 | $0 |
| $9,869,411 | $0 | $737,753 | $0 | $2,842,041 | $850,848 | $144,449 | $0 | $0 | $14,444,503 | $136,919 | |
| 2016 SURPLUS/(DEFICIT)* | ($116,029) | $503,927 | ($700,835) | $12,990 | ($27,337) | $17,815 | ($142,359) | $2,805 | $10 | ($449,014) | ($7,124) |
| CLEARING ACCOUNT ADJUSTMENTS | ($4,591) | ||||||||||
| 10/31/2016 ENDING BALANCE | $4,682,711 | $504,127 | $5,566,626 | $1,074,202 | $601,700 | $673,498 | $1,960,965 | $2,485,340 | $45,025 | $17,594,194 | $1,454,152 |
U:\bmccool\2016\All Funds Summary\2016-10 All Funds Summary.xlsx Page 1 of 1 11/7/2016
SUMMARY OF FUNDS REPORT (AKA “JOE REPORT”)
ALL FUNDS YEAR END PROJECTION OCTOBER 2016
* NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
| GENERAL FUND* | LIQUID FUELS STATE FUND | SINKING FUND | TRANSPORT. FUND | SEWER OP. FUND | REFUSE FUND | SEWER SINK FUND | OPERATING RESERVE | EVENTS FUND | TOWNSHIP FUNDS | MUNICIPAL AUTHORITY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01/01/16 BEGINNING BALANCE | $4,803,331 | $200 | 6,267,461 | 1,061,213 | 629,037 | 655,683 | $2,103,325 | $2,482,535 | $45,015 | $18,045,508 | $1,461,276 |
| RECEIPTS | |||||||||||
| 310 TAXES | $8,270,658 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $8,270,658 | $0 |
| 320 LICENSES & PERMITS | $118,040 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $118,040 | $0 |
| 330 FINES & FORFEITS | $34,376 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $34,376 | $0 |
| 340 INTERESTS & RENTS | $130,892 | $390 | $44,650 | $2,350 | $700 | $925 | $2,500 | $6,500 | $12 | $188,919 | $1,543 |
| 350 INTERGOVERNMENTAL | $135,531 | $503,447 | $400,000 | $0 | $0 | $0 | $0 | $0 | $0 | $1,038,978 | $0 |
| 360 CHARGES FOR SERVICES | $866,035 | $0 | $0 | $0 | $3,325,049 | $992,945 | $0 | $0 | $0 | $5,184,029 | $50,428 |
| 380 MISCELLANEOUS REVENUES | $1,372,704 | $0 | $0 | $10,925 | $0 | $0 | $0 | $0 | $0 | $1,383,629 | $564 |
| 390 OTHER FINANCING SOURCES | $940,197 | $0 | $342,353 | $0 | $28,092 | $0 | $205,750 | $0 | $15,000 | $1,531,392 | $77,000 |
| $11,868,433 | $503,837 | $787,003 | $13,275 | $3,353,841 | $993,870 | $208,250 | $6,500 | $15,012 | $17,750,021 | $129,535 | |
| EXPENDITURES | |||||||||||
| 400 GENERAL GOVERNMENT | $1,243,217 | $0 | $252,560 | $0 | $0 | $0 | $186,103 | $0 | $0 | $1,681,880 | $0 |
| 410 PUBLIC SAFETY | $5,908,288 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $5,908,288 | $0 |
| 420 HEALTH & WELFARE | $6,000 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $6,000 | $0 |
| 426 SANITATION & REFUSE | $112,000 | $0 | $0 | $0 | $2,487,500 | $1,052,476 | $0 | $0 | $0 | $3,651,976 | $154,000 |
| 430 HIGHWAYS,ROADS & STREETS | $2,421,588 | $503,837 | $260,842 | $0 | $0 | $0 | $0 | $0 | $0 | $3,186,267 | $0 |
| 450 CULTURE-RECREATION | $587,420 | $0 | $600,375 | $0 | $0 | $0 | $0 | $0 | $0 | $1,187,795 | $0 |
| 460 CONSERVATION & DEVELOPMENT | $5,730 | $0 | $285,492 | $0 | $0 | $0 | $0 | $0 | $0 | $291,222 | $0 |
| 470 DEBT SERVICE | $671,013 | $0 | $0 | $0 | $881,744 | $0 | $0 | $0 | $0 | $1,552,757 | $28,092 |
| 480 MISCELLANEOUS EXPENDITURES | $832,650 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $832,650 | $0 |
| 490 OTHER FINANCING USES | $15,000 | $0 | $0 | $0 | $77,000 | $0 | $0 | $0 | $0 | $92,000 | $0 |
| $11,802,906 | $503,837 | $1,399,269 | $0 | $3,446,244 | $1,052,476 | $186,103 | $0 | $0 | $18,390,835 | $182,092 | |
| 2016 SURPLUS/(DEFICIT)* | $65,527 | $0 | ($612,266) | $13,275 | ($92,403) | ($58,606) | $22,147 | $6,500 | $15,012 | ($640,814) | ($52,557) |
| PROJECTED 12/31/2016 ENDING BALANCE | $4,868,858 | $200 | $5,655,194 | $1,074,488 | $536,634 | $597,077 | $2,125,472 | $2,489,035 | $60,027 | $17,406,985 | $1,408,719 |
U:\JAltshul\Quarterly reports\2016 Q4\2016-10 All Funds Summary (YE Projection) .xlsx Page 1 of 1 11/7/2016
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
November 4, 2016
| To: | Board of Supervisors |
|---|---|
| From: | Mark Miller |
| RE: | Escrow Release for 1662 East Boot Road Lot#1 |
Renehan Building Group had requested the following items be released for:
Demolition
Clear and Grubb
Construction Entrance
12” Filter Sock
24” Filter Sock
Tree Protection
Strip Topsoil
Requested $34,503.75
$1000,00 was withheld for filter sock, construction entrance
Recommended release $33,503.75
Balance $84,297.18 including the 10% contingency
Pennoni
One South Church Street
Second Floor
West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennoni.com
November 3, 2016
EGOS 0110
Mark Miller, Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Renehan Building Group, 1662 E. Boot Road, Lot No. 1
Escrow Release Request No. 1
Dear Mark:
Renehan Building Group has submitted the above escrow release request in the amount of $34,503.75.
Approval to release $33,503.75 of the requested $34,503.75 is recommended.
The requested release includes portions of site preparation, erosion controls and earthwork.
Following approval of the recommended release, the total amount released will be $33,503.75. The total amount remaining in escrow will be $84,297.18 including $10,709.18 in the contingency line item.
Should you have any further questions or comments, please contact me.
Sincerely,
PENNONI
[Signature]
Nathan M. Cline, PE
Township Engineer
cc: Rick Smith, Township Manager (via e-mail)
Renehan Building Group, 318 E. King Street, Malvern (via e-mail)
r:\projects\egos\0110 renehan 1662 e boot rd\escrow release #1 lot 1 2016-11-03.docx
EGOS 0110
11/3/2016
In accordance with the Township-Builders Escrow Agreement for public improvements for the above referenced project, we hereby request public monies to be released from escrow for the following items of work which have been completed:
| Item | Description of Work | Scheduled value | Previously approved | This period | Total completed | Balance to finish |
|---|---|---|---|---|---|---|
| 1 | Site Prep & Erosion Controls | |||||
| a. | Demolition | $ 25,000.00 | $ - | $ 25,000.00 | $ 25,000.00 | $ - |
| b. | Clear & Grubb | $ 1,000.00 | $ - | $ 1,000.00 | $ 1,000.00 | $ - |
| c. | Construction Entrance | $ 1,500.00 | $ - | $ 1,000.00 | $ 1,000.00 | $ 500.00 |
| d. | 12" filter sock | $ 2,900.00 | $ - | $ 2,400.00 | $ 2,400.00 | $ 500.00 |
| e. | 24" filter sock | $ 750.00 | $ - | $ 750.00 | $ 750.00 | $ - |
| f. | Inlet Protection | $ 300.00 | $ - | $ - | $ 300.00 | |
| g. | Sediment trap | $ 750.00 | $ - | $ - | $ 750.00 | |
| h. | Concrete wash-out | $ 750.00 | $ - | $ - | $ 750.00 | |
| i. | Temp. Const. & Tree Prot. Fence | $ 2,353.75 | $ - | $ 2,353.75 | $ 2,353.75 | $ - |
| j. | NAG Erosion Blanket | $ 1,848.00 | $ - | $ - | $ 1,848.00 | |
| k. | Temporary Seeding | $ 1,850.00 | $ - | $ - | $ 1,850.00 | |
| l. | Maint of E&S measures | $ 1,000.00 | $ - | $ - | $ 1,000.00 | |
| Subtotal | $ 40,001.75 | $ - | $ 32,503.75 | $ 32,503.75 | $ 7,498.00 | |
| Combined Site Prep & Erosion Controls This Period - Subtotal | $ 32,503.75 | |||||
| 2 | Earthwork | |||||
| a. | Sprip Topsoil | $ 1,000.00 | $ - | $ 1,000.00 | $ 1,000.00 | $ - |
| b. | Spread Topsoil and Fine Grade | $ 1,000.00 | $ - | $ - | $ 1,000.00 | |
| c. | Permanent Seed | $ - | $ - | $ - | $ - | |
| Subtotal | $ 2,000.00 | $ - | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | |
| Combined Earthwork This Period - Subtotal | $ 1,000.00 | |||||
| 3 | Stormwater Management Basin | |||||
| a. | Stormwater Basin Front | $ 9,030.00 | $ - | $ - | $ 9,030.00 | |
| b. | Stormwater Basin Rear | $ 23,210.00 | $ - | $ - | $ 23,210.00 | |
| Subtotal | $ 32,240.00 | $ - | $ - | $ - | $ 32,240.00 | |
| Combined Stormwater Management Basin This Period - Subtotal | $ - | |||||
| 4 | Septic System Complete | |||||
| a | Septic with tanks, etc. | $ 15,000.00 | $ - | $ - | $ 15,000.00 | |
| Subtotal | $ 15,000.00 | $ - | $ - | $ - | $ 15,000.00 | |
| Combined Septic System Complete This Period - Subtotal | $ - | |||||
| 5 | Driveway Construction | |||||
| a. | Grade and Stone driveway | $ 3,000.00 | $ - | $ - | $ - | $ 3,000.00 |
| b. | Binder and Wearing Course | $ 11,250.00 | $ - | $ - | $ - | $ 11,250.00 |
| Subtotal | $ 14,250.00 | $ - | $ - | $ - | $ 14,250.00 | |
| Combined Driveway Construction This Period - Subtotal | $ - | |||||
| 6 | Miscellaneous | |||||
| a. | E&S Removal | $ 500.00 | $ - | $ - | $ - | $ 500.00 |
| b. | Corner Markers | $ 850.00 | $ - | $ - | $ - | $ 850.00 |
| c. | As-built plan | $ 850.00 | $ - | $ - | $ - | $ 850.00 |
| e. | Trees | $ 1,400.00 | $ - | $ - | $ - | $ 1,400.00 |
| Subtotal | $ 3,600.00 | $ - | $ - | $ - | $ 3,600.00 | |
| Combined Miscellaneous This Period - Subtotal | $ - | |||||
| SUBTOTAL (Items 1 through 6) | $ 107,091.75 | $ - | $ 33,503.75 | $ 33,503.75 | $ 73,588.00 | |
| 10% CONTINGENCY | $ 10,709.18 | $ - | $ - | $ - | $ 10,709.18 | |
| TOTAL | $ 117,800.93 | $ - | $ 33,503.75 | $ 33,503.75 | $ 84,297.18 | |
| APPROVED THIS RELEASE | $ 33,503.75 |
1 of 1
WIGGINS AUTO TAGS, INC.
1301 West Chester Pike • West Chester, PA 19382 • Phone (610) 692-5641 • Fax (610) 692-5724
11-5-16
NOV - 9 2016
EAST GOSHEN TWP
I WOULD LIKE permission to Sell TREES AT 1301 WEST CHESTER Pike - From 11-25 thru 12-25-16
THANK YOU
[Signature: Robert C Wiggins]
ROBERT C WIGGINS
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
1580 PAOLI PIKE
OCTOBER 18, 2016 – 7:00 pm
DRAFT MINUTES
The Board met in Executive Session at 6:00 p.m. to Conduct ABC Interviews
Present: Chairman Senya D. Isayeff, Vice-Chairman Marty Shane, Supervisors Carmen Battavio, Chuck Proctor; Janet Emanuel; Township Manager Rick Smith, Township CFO Jon Altshul, Mark Gordon (Zoning Officer, Building and Codes), Jason Lang (Director, Park and Recreation), ABC Member Erich Meyer (Conservancy Board) and Township Solicitor Kristen Camp.
Call to order & Pledge of Allegiance:
Senya called the meeting to order at 7:00 pm and asked Rick Smith to lead the assembly in the Pledge of Allegiance.
Moment of Silence:
Carmen called for a moment of silence to honor the members of the military who defend our democracy and our way of life.
Recording of Meeting: None
Chairman’s Report: Senya announced the following:
a) The Board met in Executive Session on October 11th and October 13th, and immediately prior to tonight’s meeting to discuss personnel matters (ABC interviews).
Marty made motion, Carmen seconded to appoint Jim Brandolini to Hershey's Mill Dam Committee. The Board unanimously voted, 5-0, in favor of the motion.
Carmen made a motion, Marty seconded to appoint Kishor Thakarar to the Park & Rec Commission. The Board unanimously voted, 5-0, in favor of the motion.
New Business:
Public Hearing: (A court stenographer was present and will provide a full transcript of the following hearing):
The Board held a public hearing, under the direction of Township Solicitor Kristen Camp, to consider the Conditional Use Application of Mr. and Mrs. John McDonald to operate a firearms transfer and sale business from their property at 1349 Morstein Road as a Home Occupation. The Board unanimously decided not to vote on this matter at this meeting as they felt that more detailed specifics were needed in the application. Senya encouraged the McDonalds to fully consider their request and resubmit their application, if they so desire, when the public hearing is continued on November 3, 2016.
10/18/2016 October 18, 2016 BOS Minutes Page 1 of 6
Consider Cash Flow Analysis of Major Capital Projects (Paoli Pike Trail, Township Park, Milltown and Hershey Mill Dams): Jon discussed this item noting that his analysis indicates that the Township is in a strong financial position and the four major capital projects (Paoli Pike Trail, Township Park Improvements, Milltown Dam and Hershey Mill Dam) could be constructed without a tax increase until at least 2022. Jon suggested that the Board put the Paoli Pike Trail on the agenda for the Board’s meeting on November 1, 2016. Marty thanked Jon for his analysis and all the hard work that went into making it. Rick said that he would add this topic as an action item for the November 1st Board meeting agenda, that he would send out 1,000 foot letters to applicable residents, post this item on Constant Contact as well as on the Township website. Rick further commented that the Township has received grants for over 60% of the cost for segments C through G of the Paoli Pike Trail.
Consider Issuing a Request for Proposals for a Bond Issue for Capital Projects (Paoli Pike Trail, Township Park, Milltown and Hershey Mill Dams): Jon discussed this item noting that given the above financial analysis results, he would suggest moving forward to issue an RFP for underwriting services for a $5.5 million bond issue. Jon described the role of a bond counsel and that normally it costs approximately 1.5% of the total bond issuance to cover this process from beginning to end. Rick stated that he would reach out to the East Whiteland Township Manager for a bond counsel recommendation as they have recently issued a $10 million dollar bond for work in that township.
Marty motioned that the Board direct the Township staff to develop and issue a RFP for underwriting services for a $5,500,000 bond issue. Carmen seconded.
Senya explained that the Township would be responsible for 100% of the costs for both Dam projects, and 50% of the costs for both the Paoli Pike Trail and Park Improvement projects.
Joe Buonanno, 1606 Herron Lane, commented that there were no tax increases before the existence of the East Goshen Park. Rick noted that there was a tax increase in the 1960’s and that the note on the Ashbridge Reserve is still running.
The Board voted unanimously in favor of the motion.
Consider Milltown and Hershey Mill Dam Land Planner Proposals: Rick discussed the 4 responses received to the RFP for land planners to develop plans for the areas above the Milltown and Hershey Mill Dams. The estimates received were:
| Thomas Comitta/Pennoni Associates | $75,000 |
|---|---|
| Mahan Rykiel/Land Studies | $76,700 |
| Applied Ecological Services | $99,980 |
| Simone Collins/Princetown Hydro | $79,684 |
Rick stated that Township staff reviewed the proposals and used a rating system based on experience, completeness of proposal, project approach, costs and schedule, and that a recommendation for Simone Collins/Princeton Hydro was reached.
10/18/2016 October 18, 2016 BOS Minutes Page 2 of 6
Senya stated that he respects the Township staffs’ work and recommendation in this matter, but also recalled a particular comment made by Simone Collins representatives at a prior Board meeting that many of the Board members took issue with. Senya also expressed his displeasure with references in the Simone Collins proposal to criticisms voiced by residents about the Board. Senya further commented that the use of the wording “Borough of East Goshen Township” on the Simone Collins proposal title page is not appropriate.
Senya asked if there was a motion for the Board to accept the proposal from Simone Collins/Princeton Hydro in the amount of $79,684. Janet motioned. Marty seconded.
Mike Lehmicke, 4 Reservoir Road, asked about the timing of the land planning project and who would be the lead from the Simone Collins/Princeton Hydro team. Rick explained the meeting process and stated that Simone Collins would be the lead. Marty suggested to Mr. Lehmicke that he and the other residents on the Milltown Dam Commission create two to three preferred concepts for what they would like to see in the areas above the Dam before they meet with the land planners. Senya stated that the Township may be able to obtain funding for work to be done above the Dam.
The Board voted unanimously in favor of the motion.
Consider Changing the Payment Period for Sewer and Refuse to 45 Days: Jon discussed this item. Marty motioned to direct staff to advertise for a public hearing on November 15, 2016 on proposed amendments to Chapters 188 and 194 of the Township Code. Carmen seconded. Chuck commented that the proposed Ordinance should include language of due diligence and practicality of collecting on an executed motion.
The Board voted unanimously in favor of the motion (4/0). Janet was not present for the vote.
Consider Resolution 2016-61 Increasing the Contribution to the Pension Plan to 5.5% for 2016: Jon discussed this matter. Marty motioned to adopt Resolution 2016-61 amending the East Goshen Township Non-Uniformed Defined Contribution Pension Plan for 2016. Carmen seconded. The Board voted unanimously in favor of the motion (4/0). Janet was not present for the vote.
Consider Roof Coating and Roof Replacement Bids: Rick reported that roof coating bids were opened on October 13, 2016 and the results are as follows:
| Base Bid | With Gutters & Downspouts | |
|---|---|---|
| Premier Roofing Services, LLC | $ 47,744.00 | $ 72,234.00 |
| Laurant Constructions Co. Inc. | $ 118,050.00 | $ 133,050.00 |
| Garvey Roark, LLC | $ 99,470.00 | $ 133,180.00 |
| Wilkinson Roofing & Siding, Inc. | $ 125,220.00 | $ 152,522.00 |
| McMullen Roofing Inc. | $ 115,364.80 | $ 156,454.80 |
| David/Randall Associates, Inc. | $ 116,614.90 | $ 165,114.90 |
| A. Poletto & Associates | $ 127,399.98 | $ 180,199.98 |
| Jottan, Inc. | $ 128,341.00 | $ 182,760.00 |
10/18/2016 October 18, 2016 BOS Minutes Page 3 of 6
| Roofers Edge, Inc. | $ 148,512.50 | $ 199,242.50 |
|---|---|---|
| Pro Com Roofing Corp. | $ 6,615,550.00 | $ 6,643,300.00 |
| Houch | $15,592,530.00 | $15,643,157.00 |
Rick noted that the Premier Roofing should not be considered since the alternate roof coating they proposed did not meet the bid specifications.
He noted that the bids for Roof Replacement with Gutters and Downspouts that were opened on August 30, 2016 are as follows:
| Pro Com Roofing Corp. | $ 220,653 |
|---|---|
| Laurant Construction Co. Inc. | $ 226,026 |
| Wilkinson Roofing & Siding, Inc. | $ 269,433 |
| Garvey Roark, LLC | $ 283,362 |
| Premier Roofing Services LLC | $ 285,317 |
| D.A. Nolt, Inc. | $ 395,000 |
| Jottan, Inc. | $6,110,826 |
Rick advised that based on the findings of Pennoni’s roofing expert, as well as the fact that the roof is fully depreciated and has experienced leaking in the past it was recommended that the Township building roof with gutters and downspouts be replaced. Rick also discussed the pros and cons of replacing the roof versus coating the roof, noting that the roof coating has a 10 year limited warranty while the roof replacement has a 20 year warranty: and noting that roof replacement costs would come out of Capital funds, while roof coating costs would come out of Operating funds. Senya asked how much more useful life could be realized with the current roof and if the roof needed to be replaced right away. Marty commented that it would be prudent to complete the work now and that it would be better to use funds from Capital funds, not Operating.
Marty motioned to award the Roof Replacement Bid with Gutters and Downspouts to Pro Com Roofing Corp. for $220,653. Chuck seconds. Carmen asked if the Board trusts the Pennoni report, and if the roof replacement could be put off until a later date. Rick commented that the Township prides itself on being proactive in the maintenance of the Township’s major assets.
Brad Gerase, a resident, stated that limited warranties are useless when it comes to roof coating, and he would not recommend roof coating.
The Board voted 3/1 in favor of the motion, with Senya in opposition. Janet was not present for the vote.
Consider 2016 End of Summer Recreation Report: Tabled for another meeting TBD.
Approval of Minutes: The Board reviewed and corrected the minutes of the October 4, 2016 meeting. Marty motioned to approve. Chuck seconded. The Board voted unanimously in favor of the motion 4/0. Janet was not present for the vote.
10/18/2016 October 18, 2016 BOS Minutes Page 4 of 6
Treasurer’s Report:
See attached Treasurer’s Report for October 13, 2016. The Board reviewed the Treasurer’s Report and the current invoices. Carmen moved to graciously accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed, with the exception of the Neighborhood Nursing invoice, as the Board would like to receive a report from this organization to determine if a greater contribution is more appropriate. Senya seconded. The Board voted unanimously to approve the motion, 4/0. Janet was not present for the vote.
Correspondence, Reports of Interest: The Board acknowledged receipt of the following:
a) E-mail regarding Public Works paving in Wyllpen Farms
b) Act 14 notice regarding the West Goshen Sewer Treatment Plant
Adjournment:
There being no further business, Carmen motioned to adjourn the meeting. Marty seconded. The Board voted unanimously to adjourn the meeting at 10:59 p.m.
Respectfully submitted,
Christina Rossetti Hartnett
Recording Secretary
Attachment: Treasurer’s Report for October 13, 2016
10/18/2016 October 18, 2016 BOS Minutes Page 5 of 6
October 13, 2016
TREASURER'S REPORT
2016 RECEIPTS AND BILLS
| RECEIPTS | EXPENDITURES | ||
|---|---|---|---|
| GENERAL FUND | Accounts Payable | $906,872.84 | |
| Real Estate Tax | $732.51 | Electronic Pmts: | |
| Earned Income Tax | $49,867.21 | Credit Card | $0.00 |
| Local Service Tax | ($6,596.88) | Postage | $0.00 |
| Transfer Tax | $92,848.43 | Debt Service | $216,099.73 |
| General Fund Interest Earned | $479.36 | Payroll | $107,590.00 |
| Total Other Revenue | $898,916.28 | Total Expenditures: | $1,230,562.57 |
| Total Receipts: | $1,036,246.91 | ||
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $62.14 | ||
| Total State Liqud Fuels: | $62.14 | Expenditures: | $0.00 |
| SINKING FUND | |||
| Receipts | $0.00 | Accounts Payable | $15,190.91 |
| Interest Earned | $404.02 | Credit Card | $0.00 |
| Total Sinking Fund: | $404.02 | Total Expenditures: | $15,190.91 |
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $214.71 | ||
| Total Sinking Fund: | $214.71 | Expenditures: | $0.00 |
| SEWER OPERATING FUND | |||
| Receipts | $135,506.38 | Accounts Payable | $116,716.52 |
| Interest Earned | $59.31 | Debt Service | $119,589.97 |
| Total Sewer: | $135,565.69 | Credit Card | $0.00 |
| Total Expenditures: | $236,306.49 | ||
| REFUSE FUND | |||
| Receipts | $47,906.82 | ||
| Interest Earned | $14.99 | ||
| Total Refuse: | $47,921.81 | Expenditures: | $74,037.30 |
| SEWER SINKING FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $96.79 | ||
| Total Sewer Sinking Fund: | $96.79 | Expenditures: | $2,768.00 |
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $341.57 | ||
| Total Operating Reserve Fund: | $341.57 | Expenditures: | $0.00 |
| Events Fund | |||
| Receipts | $0.00 | ||
| Interest Earned | $1.00 | ||
| Total Events Fund: | $1.00 | Expenditures: | $0.00 |
10/18/2016 October 18, 2016 BOS Minutes Page 6 of 6
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
TUESDAY, NOVEMBER 1, 2016 – 7:00 pm
DRAFT MINUTES
Present: Chairman Senya D. Isayeff, Supervisors Chuck Proctor, Carmen Battavio, Marty Shane, Janet Emanuel, Township Manager Rick Smith, Township CFO Jon Altshul, Mark Gordon (Zoning Officer, Building and Codes), Jason Lang (Director, Park and Recreation), ABC Member Erich Meyer (Conservancy Board).
Call to Order & Pledge of Allegiance:
Senya called the meeting to order at 7:00 pm and asked Natasha Manbeck, of McMahon Associates, to lead the assembly in the Pledge of Allegiance.
Moment of Silence:
Carmen called for a moment of silence to honor the troops who defend of our Nation and Constitution.
Recording of Meeting: Leo Sinclair, 217 North Lochwood Lane, indicated that he would be recording the minutes, and declared to the Board that it is a violation of First Amendment rights to ask if anyone is recording the meeting. He noted that he had raised this issue at a West Goshen Township meeting and our solicitor was aware of the issue. The Board asked Rick to have the solicitor look into the issue.
Chairman’s Report: Senya noted the following:
a. The Board was prepared to present the Friends of East Goshen Certificate of Appreciation to Mr. and Mrs. Nickolas G. Perakis for their Fireworks Sponsorship at Community Day; however they were not present at the meeting.
b. A presentation by Neighborhood Health Agency. Andrea L. Devoti, President and CEO of the Neighborhood Health Agencies, Inc., discussed the services of this organization which include health services to the Wellington and Bellingham Senior Living Centers, Hospice and Home Care, nutrition services, geriatric services, blood pressure screenings at the local YMCA, to name just a few. Carmen stated his gratitude to this organization and that he can personally attest to the value of this organization, having used the Hospice care in the past for three family members. Marty asked what the qualifications are to receive services. Andrea stated that the only requirement is that a patient’s primary physician must agree to and oversee the care given.
Kishor Thakarar, 902 Madison Drive, a pharmacist, stated that he can attest to the great care given by the health professionals who work for this agency.
Julieta Calmon, 1549 Tanglewood Drive, asked if all services are provided at no cost to all recipients. Andrea stated that of the approximately 6000 patients who receive their care, roughly 200 of them receive services free of charge.
c. Jason Lang announced that the Township has been awarded a $225,000 grant from the Commonwealth Financing Authority for improvements to the playground at the Township Park.
11/1/2016 November 1, 2016 BOS Minutes Page 1 of 7
Old Business:
a. Consider proceeding with the construction of the Paoli Pike Trail (PPT) between Reservoir Road and Line Road: Rick discussed this item. Marty motioned to accept the grants in the amount of $2,886,000, and begin with the construction of a bicycle and pedestrian trail along Paoli Pike between Reservoir and Line Road. Carmen seconded.
Charles Higgins, 904 Vista Drive, forcefully read his statement and expressed his extreme displeasure with this consideration. Mr. Higgins referenced Jason Lang’s letter to the community about the benefits of the trail, and expressed his opposition in the following areas stating that:
- The walkways in the Park are not cleared of snow, so why would the trail pathways be cleared of snow. How would residents walk on the trail in these instances?
- Children do not walk to school in today’s day and age.
- The Goshen Shopping Center has always been a flop, so how will the PPT help that.
- No one walks in today’s day and age.
- The PPT would destroy the Goshen Friends cemetery land.
Mr. Higgins concluded by stating that the Paoli Pike Trail should be “killed”.
Joe Buonanno, 1606 Herron Lane, stated that he agrees with Mr. Higgins for the following reasons:
- The PPT is discretionary spending.
- He is against a bond issuance to address this capital expenditure.
- This matter should be handled with a referendum.
- All of the walking initiatives could be addressed in further Park enhancements.
- The Township would be taking land from the Quakers.
Senya commented that the Township’s AAA rating is because the Township reserves for all of its capital expenditures and projects conservatively 20 years out into the future. Senya further stated that the Township did not take anything away from the Hicks, but rather the Hicks family sold portions of their property to pay for capital gains taxes. Rick and Carmen informed Mr. Buonanno that all of his emails have been recorded in the meeting agenda packet or they have been included as handouts for the meeting. Mr. Buonanno asked about connectivity of outer neighborhoods to the PPT. Senya stated that this concept is part of the overall long term plan for this project, but that all aspects cannot be addressed all at once in the beginning phases.
Leo Sinclair, stated that he is a fiscally responsible person, and he does not think it is prudent to take out loans to pay for something like the PPT. Mr. Sinclair also asked why his letter with seven questions has not been addressed by the Board. Mr. Sinclair then reviewed his seven questions with the Board.
11/1/2016 November 1, 2016 BOS Minutes Page 2 of 7
Armarildo Capuni, 1723 Towne Drive, stated that he also works at a business in one of the East Goshen Corporate Parks. He recently moved to East Goshen from Center City Philadelphia, and he and his entire family have grown to love East Goshen for its quality schools and especially loves the concept of the PPT. Mr. Carponi used the phrase, “If you let the water sit, it will smell”, to remind the assembly that change is good, and the PPT would be a wonderful addition to East Goshen Township.
Rogers Vaughn, of Hershey’s Mill, has served on the Futurist Committee. Mr. Vaughn commented on the work of the Futurist Committee and the ways in which the Committee sought for East Goshen Township to differentiate itself from other townships. The Futurist Committee concluded that the creation of a Town Center was the way to go. It would attract restaurants, better shopping opportunities and ultimately more people to the area.
Leo Sinclair, stated that he is not necessarily against the trail, but is against financing the trail. He commented on other ways to raise revenue for the trail such as selling bricks to pay for it. Mr. Sinclair is against a bond issuance as a way to finance the PPT. Mr. Sinclair also asked why his email address was not removed from his e-mail in the meeting packet. Rick said that was a mistake and apologized for that.
Len D’Antonio, 611 Meadow Lane, stated that he received the 1,000 foot letter. He was initially against the idea of the PPT, but has since realized that his family and children would ultimately use it frequently. Mr. D’Antonio said that the PPT is a good, commenting that “If you build it, they will come”.
Marty commented that the Board’s priority is to ultimately maintain property values for all its residents. Marty referenced studies on the desires of the “millennial age”, and ways to attract them to the Township, which is completely built out. The Township has prepared careful cost analysis studies on this capital expenditure.
Senya further stated the importance of open space and walkability to those of the millennial age group.
The Board voted unanimously in favor of the motion.
b. Consider authorizing execution of the Paoli Pike Trail Easement with the Goshen Friends: Rick discussed this item. Carmen motioned to authorize the Chairman to execute the trail easement with the Goshen Friends. Janet seconded.
Joe Buonanno, 1606 Herron Lane, asked the Board if this agreement was equitably fair to the Goshen Friends.
Jack Embick, a representative of the Goshen Monthly Meeting, stated that the Goshen Friends approve of this action. The Board voted unanimously in favor of the motion.
c. Consider proposal from McMahon for Paoli Pike Trail Segment D & E: Mark discussed this item. Leo Sinclair asked if all businesses have expressed their happiness with this plan. Mark stated that the Township has met with the property owners to review the PPT plans, however, it cannot meet with them to discuss the proposed easements until the Township has prepared fully engineered plans and had appraisals
11/1/2016 November 1, 2016 BOS Minutes Page 3 of 7
done, as these funding sources have procedural restrictions. Natasha Manbeck confirmed that the Federal funding process outlines certain communication restrictions.
Dan Truitt, Grand Oak Lane, asked if the costs outlined by the Township are truly the costs. Jon stated that his numbers have a 15% contingency figure built into them. Janet stated that certain business owners had concerns with the PPT, and adjustments were made to address those concerns.
Carmen motioned to accept the September 14, 2016 proposal from McMahon Associates in the amount of $316,800 for the Paoli Pike Trail Segments D & E. Chuck seconded. The Board voted unanimously in favor of the motion.
d. Consider proposal from McMahon for Paoli Pike Trail Segment F & G: Mark Gordon discussed this item. Janet motioned to accept the September 14, 2016 proposal from McMahon Associates in the amount of $118,900 for the Paoli Pike Trail Segments F & G. Chuck seconded.
Tom McDonald, 646 Thorncroft Drive, asked if this segment of the trail is necessary when trails already exist in the park. Mark explained that the rationale was to keep bicyclists who may be moving at-high speeds, away from those using the park trails for walking or recreational purposes.
Leo Sinclair, 217 North Lochwood Lane, stated that he is aware of laws that restrict activities in “passive parks”, such as Applebrook Park. Chuck said that he would review the legal document that Mr. Sinclair was referring to.
Joe Buonanno, 1606 Herron Lane, asked why a bike trail would be necessary when existing trails were already in place. Mark restated that the bike trail would be necessary for safety sake, and to differentiate from the recreational walking trails in the park.
The Board voted unanimously in favor of the motion.
New Business:
a. Consider authorizing submission of a PennDOT Multimodal Transportation Fund grant application for the Paoli Pike Trail, Segments A-B: Jason discussed this item. Carmen asked that in light of other segments of the trail already funded, would it not be easier to get new funding for this segment. Natasha said that funders like to see other funders in place for new projects, so with other segments of the trail already funded, this would be a benefit to getting new monies.
Joe Buonanno, 1606 Herron Lane, asked if this segment of the trail does not get funded will the Township then pay 100% of the cost. Senya stated that would not happen, and that the Township would look for new funding sources if this was the case.
Carmen motioned to authorize application for the PennDOT Multimodal Transportation Fund in the amount of $1,515,000 and approve matching funds in the amount of $1,515,000. Janet seconded. The Board voted unanimously in favor of the motion.
b. Consider Paoli Pike Corridor Master Plan Proposal: Mark discussed this item. Rick explained the motion and the federal process and regulations that apply. Janet commented that, in keeping with the work and recommendations of the Futurist Committee, it would be useful to include developmental sketches of key site areas, and to prepare a vision of these areas 15 to 20 years out into the future, as well as including in
11/1/2016 November 1, 2016 BOS Minutes Page 4 of 7
this proposal concepts of connectivity from adjacent neighborhoods to the Town Center. Mr. Vaughn, a former member of the Futurist Committee, stated that the plan needs visualization, 10 years out, in order to create real excitement and interest.
Janet motioned to accept the McMahon Associates/TCA proposal to perform the work outlined in their proposal for the Paoli Pike Corridor Master Plan and to begin contract negotiations for the project with the following conditions:
- One additional public meeting is added in order to meet with the Planning Commission early on in the process during a regularly scheduled PC meeting to solicit their input.
- An “Open House” format be used for the two public meetings with the Board of Supervisors so members of the public can get a brief overview of the plan, see the work done to date, ask questions and provide input for the plan.
Carmen seconded. The Board voted unanimously in favor of the motion.
c. Consider Advertising 2017 Preliminary Budget: Jon reviewed this item noting that all detailed information on the topics are posted online under “Services/Finance/2017 Budget. Jon stated that the purpose of this item is to reach agreement about whether to approve advertisement of the 2017 budget for public inspection for at least 20 days prior to adoption, after which time budgeted expenses or revenues can be increased no more than 10% in the aggregate and 25% in any major expense category prior to adoption. The tentative date for budget adoption is set for the December 6, 2016 Board meeting. The areas discussed included:
- Overview of 2017 Proposed Budget
- Proposed 2017-2021 Capital Improvement Program
Carmen inquired about the Events budget. Senya stated that he is meeting with West Goshen Township after Thanksgiving to discuss details of the Bicentennial celebrations. Joe Buonanno asked why East Goshen Township is paying West Goshen Township $2 million dollars over the next several years. Rick stated that some of East Goshen’s sewer flows are treated in West Goshen and per a long-standing agreement; East Goshen is responsible for 1/6th of capital costs at the West Goshen Sewer Plant.
Carmen motioned to authorize advertisement of the Township’s 2017 Proposed Budget. Chuck seconded. The Board voted unanimously in favor of the motion.
d. Consider Wireless Communication Facilities Amendment to the Zoning Ordinance: Rick discussed this item. Chuck motion that the Planning Commission support this amendment to the Wireless Communications section of the Zoning Ordinance and recommend that the Board of Supervisors move forward with it adoption. Carmen seconded.
Leo Sinclair asked if the large towers would become redundant. Rick said that they would not. Janet confirmed that the large towers would still have usefulness. The Board voted unanimously in favor of the motion.
11/1/2016 November 1, 2016 BOS Minutes Page 5 of 7
e. Consider Stormwater Agreement for 820 Cottonwood Drive: Marty motioned to authorize the execution of the storm water management operation and maintenance agreement for 820 Cottonwood Drive. Carmen seconded. The Board voted unanimously in favor of the motion.
Approval of Minutes: The Board reviewed and made changes to the minutes from the October 18, 2016 meeting. Those minutes will be considered again at the November 15th meeting.
Treasurer’s Report:
See attached Treasurer’s Report for October 27, 2016. The Board reviewed the Treasurer’s Report and the current invoices. Carmen moved to graciously accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Chuck seconded. The Board voted unanimously to approve the motion.
Correspondence, Reports of Interest: The Board acknowledged receipt of the following:
- 9/26/16 letter from FEMA approving the Hazard Mitigation Plan
- 10/21/16 email from Joe Buonanno concerning the East Goshen Park
- 10/25/16 email from Charles Higgins concerning the Paoli Pike Trail
- 10/27/16 email from Joe Buonanno concerning the Paoli Pike Trail
Adjournment:
There being no further business, Marty motioned to adjourn the meeting at 10:32 pm. Janet seconded. The Board voted unanimously to adjourn.
Respectfully submitted,
Christina Rossetti Hartnett
Recording Secretary
Attachment: Treasurer’s Report for October 27, 2016
11/1/2016 November 1, 2016 BOS Minutes Page 6 of 7
October 27, 2016
TREASURER'S REPORT
2016 RECEIPTS AND BILLS
| GENERAL FUND | |||
|---|---|---|---|
| Real Estate Tax | $3,409.74 | Accounts Payable | $95,701.89 |
| Earned Income Tax | $88,000.00 | Electronic Pmts: | |
| Local Service Tax | $8,000.00 | Credit Card | $1,296.90 |
| Transfer Tax | $0.00 | Postage | $0.00 |
| General Fund Interest Earned | $0.00 | Debt Service | $0.00 |
| Total Other Revenue | $51,649.02 | Payroll | $104,751.00 |
| Total Receipts: | $151,058.76 | Total Expenditures: | $201,749.79 |
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $0.00 | ||
| Total State Liqud Fuels: | $0.00 | Expenditures: | $0.00 |
| SINKING FUND | |||
| Receipts | $0.00 | Accounts Payable | |
| Interest Earned | $0.00 | Credit Card | $0.00 |
| Total Sinking Fund: | $0.00 | Total Expenditures: | $0.00 |
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $0.00 | ||
| Total Sinking Fund: | $0.00 | Expenditures: | $0.00 |
| SEWER OPERATING FUND | |||
| Receipts | $110,553.91 | Accounts Payable | $114,197.60 |
| Interest Earned | $0.00 | Debt Service | $0.00 |
| Credit Card | $0.00 | ||
| Total Sewer: | $110,553.91 | Total Expenditures: | $114,197.60 |
| REFUSE FUND | |||
| Receipts | $41,634.67 | ||
| Interest Earned | $0.00 | ||
| Total Refuse: | $41,634.67 | Expenditures: | $12,487.86 |
| SEWER SINKING FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $0.00 | ||
| Total Sewer Sinking Fund: | $0.00 | Expenditures: | $9,900.71 |
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $0.00 | ||
| Total Operating Reserve Fund: | $0.00 | Expenditures: | $0.00 |
| Events Fund | |||
| Receipts | $0.00 | ||
| Interest Earned | $0.00 | ||
| Total Events Fund: | $0.00 | Expenditures: | $0.00 |
1
11/1/2016 November 1, 2016 BOS Minutes Page 7 of 7
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
TUESDAY, NOVEMBER 3, 2016 – 7:00 pm
DRAFT MINUTES
Present: Chairman Senya D. Isayeff, Supervisors Chuck Proctor, Carmen Battavio, Marty Shane, Janet Emanuel, Township Zoning Officer Mark Gordon, and Court Reporter Colleen Pimer
Call to Order & Pledge of Allegiance:
Senya called the meeting to order at 7:00 pm and lead the assembly in the Pledge of Allegiance.
Moment of Silence:
Carmen called for a moment of silence to honor the troops who defend of our Nation and Constitution.
Recording of Meeting: Senya asked the audience if anyone will be recording the meeting other than Ms. Pimer who will be transcribing the conditional use hearing. No one indicated as such.
Public Hearing: (A court stenographer, Ms. Colleen Pimer, was present and will provide a full transcript of the following hearing):
The Board reopened the public hearing of Mr. and Mrs. McDonald, which began on October 18, 2016; under the direction of Township Solicitor Joseph Brion, to consider the Conditional Use Application of Mr. and Mrs. John McDonald who seek approval to operate a firearms sales and transfers business as a Home Occupation, from their property at 1349 Morstein Road.
The Board unanimously decided not to vote on this matter at this meeting as they felt that more detailed testimony is needed by the applicants on the specifics of their business plan and its operation. The hearing is continued to November 14, 2016.
New Business:
a. Consider a resident petition to amend the Zoning Ordinance to prohibit firearm sales as a Home Occupation: Ms. Monica Holland, 1230 Waterford Rd., addressed the Board to request that the Board consider amending the Home Occupation section of the Zoning Ordinance, §240-32.J(7) Uses not permitted, adding Firearms Sales to the list of uses not permitted.
Marty made the following motion: “Mr. Chairman, I move that the Board consider adopting an amendment to the zoning ordinance adding “Firearms sales and transfer businesses” to the list of uses not permitted as a home occupation, and ask the Planning Commission to draft the amendment.”
The motion was seconded by Janet.
The Board discussed the motion.
11/3/2016 November 3, 2016 BOS Minutes Page 1 of 2
Janet had to leave early prior to the vote on the motion and was not present for the votes.
The Board called the motion to a vote; 3 in favor, 1 opposed (Chuck).
Adjournment:
There being no further business, Marty motioned to adjourn the meeting at 10:05pm. The motion was seconded by Chuck. The Board voted unanimously to adjourn.
Respectfully submitted,
Mark Gordon
Township Zoning Officer
11/3/2016 November 3, 2016 BOS Minutes Page 2 of 2
November 10, 2016
TREASURER'S REPORT
2016 RECEIPTS AND BILLS
| GENERAL FUND | |||
|---|---|---|---|
| Real Estate Tax | $2,522.72 | Accounts Payable | $319,547.32 |
| Earned Income Tax | $688,485.60 | Electronic Pmts: | |
| Local Service Tax | $53,503.29 | Credit Card | $0.00 |
| Transfer Tax | $0.00 | Postage | $0.00 |
| General Fund Interest Earned | $963.12 | Debt Service | $0.00 |
| Total Other Revenue | $42,347.34 | Payroll | $95,669.65 |
| Total Receipts: | $787,822.07 | Total Expenditures: | $415,216.97 |
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $64.22 | ||
| Total State Liqud Fuels: | $64.22 | Expenditures: | $0.00 |
| SINKING FUND | |||
| Receipts | $0.00 | Accounts Payable | $0.00 |
| Interest Earned | $388.98 | Credit Card | $0.00 |
| Total Sinking Fund: | $388.98 | Total Expenditures: | $0.00 |
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $250.45 | ||
| Total Sinking Fund: | $250.45 | Expenditures: | $0.00 |
| SEWER OPERATING FUND | |||
| Receipts | $168,761.50 | Accounts Payable | $196,736.10 |
| Interest Earned | $53.15 | Debt Service | $0.00 |
| Credit Card | $0.00 | ||
| Total Sewer: | $168,814.65 | Total Expenditures: | $196,736.10 |
| REFUSE FUND | |||
| Receipts | $58,768.91 | ||
| Interest Earned | $13.65 | ||
| Total Refuse: | $58,782.56 | Expenditures: | $11,118.17 |
| SEWER SINKING FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $98.00 | ||
| Total Sewer Sinking Fund: | $98.00 | Expenditures: | $442.87 |
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | ||
| Interest Earned | $353.04 | ||
| Total Operating Reserve Fund: | $353.04 | Expenditures: | $0.00 |
| Events Fund | |||
| Receipts | $0.00 | ||
| Interest Earned | $1.03 | ||
| Total Events Fund: | $1.03 | Expenditures: | $0.00 |
EAST GOSHEN TOWNSHIP
MEMORANDUM
TO: BOARD OF SUPERVISORS
FROM: BRIAN MCCOOL
SUBJECT: PROPOSED PAYMENTS OF BILLS
DATE: 10-27-2016
Please accept the attached Treasurer’s Report and Expenditure Register Report for consideration by the Board of Supervisors as well as the $6,000 donation to Neighborhood Health Agencies which appeared in the October 13, 2016 Treasurer’s report. I recommend the Treasurer’s Report and each register item be approved for payment
General Fund expenses include $237,055 for the November contribution to WEGO and $33,059 for health insurance. At the 10/18/16 meeting, the Board deferred on approving the $6,000 annual donation the Neighborhood Health Agencies and invited a representative from that group to attend your 11/1/16 meeting, which she did. This expenditure is not in this week’s expenditure register; however, we would recommend that you approve this payment as part of your motion.
EIT and LST revenues are well above average due to remittances of 3rd quarter payments from Keystone.
Sewer Fund expenses include a payment in the amount of $177,707 to West Goshen for 3rd quarter operations and management costs.
Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.
F:\Data\Shared Data\Finance Dept\Treasurers' Reports6\11-10-2016\11-10-2016 Memo.docx
East Goshen Township Fund Accounting
BATCH 1 OF 3
Report Date 11/04/16 Expenditures Register PAGE 1
GL-1611-55486
MARP05 run by BARBARA 2 : 52 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 GENERAL FUND | ||||||||||
| 1471 | WESTTOWN-EAST GOSHEN POLICE | |||||||||
| 49193 1 | 01410 | 5300 | POLICE GEN.EXPENSE NOVEMBER 2016 CONTRIBUTION |
110116 | 11/04/16 | 11/01/16 | 11/04/16 | 12257 p | 237,054.68 | |
| 237,054.68 | ||||||||||
| 237,054.68 | ||||||||||
| 1 Prepaids, totaling | 237,054.68 | |||||||||
| 0 Printed, totaling | 0.00 | |||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 237,054.68 | GENERAL FUND |
| 237,054.68 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1611 | 237,054.68 |
| 237,054.68 |
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 1
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 GENERAL FUND | ||||||||||
| 2226 | 21ST CENT.MEDIA-PHILLY #884433 | |||||||||
| 49194 1 | 01401 | 3400 | ADVERTISING - PRINTING NOTICE - BOS CONDITIONAL USE |
1121669 | 11/07/16 | 11/07/16 | 278.28 | |||
| 278.28 | ||||||||||
| 1903 | ALTHOUSE, GARY | |||||||||
| 49197 1 | 01401 | 3300 | AUTO ALLOWANCE MILEAGE REIMB. 59 MILES @.54 |
102516 | 11/07/16 | 11/07/16 | 31.86 | |||
| 31.86 | ||||||||||
| 68 | AMS APPLIED MICRO SYSTEMS LTD. | |||||||||
| 49198 1 | 01401 | 3120 | CONSULTING SERVICES OCTOBER 2016 |
62758 | 11/07/16 | 11/07/16 | 597.00 | |||
| 49198 2 | 01414 | 5001 | ZONING IT CONSULTING OCTOBER 2016 - GEO PLAN |
62758 | 11/07/16 | 11/07/16 | 28.00 | |||
| 625.00 | ||||||||||
| 1657 | AQUA PA | |||||||||
| 49199 1 | 01409 | 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 000309820 0309820 9/20-10/21/16 FR |
102516 FR | 11/07/16 | 11/07/16 | 192.00 | |||
| 49200 1 | 01409 | 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 000309828 0309828 9/20-10/21/16 TB |
102516 TB | 11/07/16 | 11/07/16 | 119.90 | |||
| 49201 1 | 01409 | 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 000309801 0309801 9/23-10/26/16 BS |
102816 BS | 11/07/16 | 11/07/16 | 16.00 | |||
| 49202 1 | 01409 | 3605 | PW BLDG - FUEL,LIGHT,SEWER & WATER 000496917 0309798 9/20-10/21/16 PW |
102516 PW | 11/07/16 | 11/07/16 | 225.04 | |||
| 552.94 | ||||||||||
| 102 | B&D COMPUTER SOLUTIONS | |||||||||
| 49208 1 | 01401 | 3120 | CONSULTING SERVICES OCTOBER 2016 |
00003066 | 11/07/16 | 11/07/16 | 2,000.00 | |||
| 2,000.00 | ||||||||||
| 1998 | BARCO PRODUCTS COMPANY | |||||||||
| 49209 1 | 01454 | 2000 | MAINTENANCE SUPPLIES PET LITTER BAGS 10 ROLLS |
101600830 | 11/07/16 | 11/07/16 | 923.62 | |||
| 923.62 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 2
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 2973 | BORTEK INDUSTRIES INC. | |||||||||
| 49212 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR REPAIR FLOOR SWEEPER - VAC SYSTEM |
AB047848 | 11/07/16 | 11/07/16 | 901.85 | |||
| 49213 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR REPAIR FL. SWEEPER - BRUSH CIRCUIT |
AB047891 | 11/07/16 | 11/07/16 | 637.98 | |||
| 49214 1 | 01437 | 2460 | GENERAL EXPENSE - SHOP GUM BLADE KIT |
AB047882 | 11/07/16 | 11/07/16 | 64.63 | |||
| 1,604.46 | ||||||||||
| 3488 | CINTAS CORPORATION #287 | |||||||||
| 49217 1 | 01409 | 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 10/12/16 CLEAN MATS |
287630145 | 11/07/16 | 11/07/16 | 74.75 | |||
| 49217 2 | 01487 | 1910 | UNIFORMS WEEK END 10/12/16 CLEAN UNIFORMS |
287630145 | 11/07/16 | 11/07/16 | 374.42 | |||
| 49218 1 | 01409 | 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 10/26/16 CLEAN MATS |
287636791 | 11/07/16 | 11/07/16 | 74.75 | |||
| 49218 2 | 01487 | 1910 | UNIFORMS WEEK END 10/26/16 CLEAN UNIFORMS |
287636791 | 11/07/16 | 11/07/16 | 359.92 | |||
| 49219 1 | 01409 | 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 11/02/16 CLEAN MATS |
287640106 | 11/07/16 | 11/07/16 | 74.75 | |||
| 49219 2 | 01487 | 1910 | UNIFORMS WEEK END 11/02/16 CLEAN UNIFORMS |
287640106 | 11/07/16 | 11/07/16 | 334.92 | |||
| 1,293.51 | ||||||||||
| 317 | CONTRACTOR'S CHOICE | |||||||||
| 49220 1 | 01437 | 2460 | GENERAL EXPENSE - SHOP TRAK-IT PIN & SENCO WASHERS |
00205911 | 11/07/16 | 11/07/16 | 110.51 | |||
| 110.51 | ||||||||||
| 1990 | CRYSTAL SPRINGS | |||||||||
| 49221 1 | 01401 | 2100 | MATERIALS & SUPPLIES COFFEE CREAMER, SPLENDA & COFFEE |
3154612-102816 | 11/07/16 | 11/07/16 | 193.54 | |||
| 193.54 | ||||||||||
| 3613 | DELAWARE VALLEY HEALTH TRUST | |||||||||
| 49222 1 | 01486 | 1560 | HEALTH,ACCID. & LIFE NOVEMBER 2016 PREMIUM MED.&RX |
12054 | 11/07/16 | 11/07/16 | 32,248.17 | |||
| 49222 2 | 01213 | 1000 | DENTAL INSURANCE W/H NOVEMBER 2016 PREMIUM DENTAL |
12054 | 11/07/16 | 11/07/16 | 810.61 | |||
| 33,058.78 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 3
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 418 | EAGLE POWER AND EQUIPMENT | |||||||||
| 49223 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR AIR ASSEMBLY ELEMENT & FILTERS |
T448112 | 11/07/16 | 11/07/16 | 85.06 | |||
| 49224 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR SUPER UDT OIL |
T448115 | 11/07/16 | 11/07/16 | 21.77 | |||
| 49225 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR TRANSMISSION OIL |
T448132 | 11/07/16 | 11/07/16 | 90.66 | |||
| 49226 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR A/C CABIN FILTER |
T448133 | 11/07/16 | 11/07/16 | 21.47 | |||
| 49227 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR TRANSMISSION OIL |
T448138 | 11/07/16 | 11/07/16 | 181.32 | |||
| 400.28 | ||||||||||
| 430 | EAST GOSHEN TWP - SEWER | |||||||||
| 49228 1 | 01409 | 3605 | PW BLDG - FUEL,LIGHT,SEWER & WATER QTR.4 2016 SEWER - PW |
100116-PW | 11/07/16 | 11/07/16 | 270.28 | |||
| 49229 1 | 01409 | 3600 | TWP. BLDG. - FUEL, LIGHT, WATER QTR.4 2016 SEWER - TWP. |
100116-TWP | 11/07/16 | 11/07/16 | 111.06 | |||
| 381.34 | ||||||||||
| 3407 | ETS EQUIPMENT TRADE SERVICE CO. INC. | |||||||||
| 49230 1 | 01438 | 2455 | MATER. & SUPPLY-RESURFAC. TAR PITCHOUT REMOVER |
1037480 | 11/07/16 | 11/07/16 | 348.77 | |||
| 348.77 | ||||||||||
| 3141 | GFOA-PA EAST | |||||||||
| 49231 1 | 01487 | 4600 | TRAINING & SEMINARS-EMPLY LIQ.FUELS PRESENTATION - B.PHILLIPS |
110716 | 11/07/16 | 11/07/16 | 25.00 | |||
| 25.00 | ||||||||||
| 3131 | GREAT AMERICA FINANCIAL SERVICES | |||||||||
| 49232 1 | 01401 | 3840 | RENTAL OF EQUIP. -OFFICE NOVEMBER 2016 LANIER MP C5503 |
19584022 | 11/07/16 | 11/07/16 | 305.00 | |||
| 305.00 | ||||||||||
| 569 | GREAT VALLEY LOCKSHOP | |||||||||
| 49233 1 | 01409 | 3740 | TWP. BLDG. - MAINT & REPAIRS FIX LOBBY DOOR - LEFT SIDE |
2016003139 | 11/07/16 | 11/07/16 | 140.00 | |||
| 140.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 4
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 594 | HAMMOND & MCCLOSKEY INC. | |||||||||
| 49234 1 | 01454 | 3740 | EQUIPMENT MAINT. & REPAIR REPAIR FLUSH VALVE-PARK LADIES ROOM |
7942 | 11/07/16 | 11/07/16 | 154.02 | |||
| 154.02 | ||||||||||
| 627 | HIGHWAY MATERIALS INC. | |||||||||
| 49237 1 | 01438 | 2455 | MATER. & SUPPLY-RESURFAC. 1.50.06 TONS 19B 3<30 |
1641912MB | 11/07/16 | 11/07/16 | 6,400.06 | |||
| 6,400.06 | ||||||||||
| 2497 | JUDGE MOBILE WASH | |||||||||
| 49239 1 | 01454 | 3740 | EQUIPMENT MAINT. & REPAIR PRESSURE WASH GRAFFITI EGT PARK |
J29594 | 11/07/16 | 11/07/16 | 2,500.00 | |||
| 2,500.00 | ||||||||||
| 787 | LOW-RISE ELEVATOR CO. INC | |||||||||
| 49240 1 | 01409 | 3740 | TWP. BLDG. - MAINT & REPAIRS BASIC MAINTENANCE - OCTOBER 2016 |
68499 | 11/07/16 | 11/07/16 | 40.00 | |||
| 40.00 | ||||||||||
| 800 | MACANGA INC. | |||||||||
| 49241 1 | 01438 | 2455 | MATER. & SUPPLY-RESURFAC. HOT TAR & 3 LABORERS |
090116 | 11/07/16 | 11/07/16 | 2,840.00 | |||
| 2,840.00 | ||||||||||
| 1641 | NAPA AUTO PARTS | |||||||||
| 49242 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR BATTERY |
2-681023 | 11/07/16 | 11/07/16 | 38.90 | |||
| 38.90 | ||||||||||
| 967 | O'MALLEY TOPSOIL LLC | |||||||||
| 49243 1 | 01438 | 2450 | MATERIALS & SUPPLIES-HIGHWAYS 12 YDS SCREENED TOPSOIL |
3112 | 11/07/16 | 11/07/16 | 216.00 | |||
| 49243 2 | 01438 | 2450 | MATERIALS & SUPPLIES-HIGHWAYS 12 YDS SCREENED TOPSOIL |
3116 | 11/07/16 | 11/07/16 | 216.00 | |||
| 432.00 | ||||||||||
| 1554 | OFFICE DEPOT | |||||||||
| 49244 1 | 01401 | 2100 | MATERIALS & SUPPLIES INDES MAKERS, CORRECTION TAPE, PENS HIGHLIGHTERS, HP TONER & GEL PEN REFILLS |
872815775001 | 11/07/16 | 11/07/16 | 180.26 | |||
| 49245 1 | 01401 | 2100 | MATERIALS & SUPPLIES INDX TAB DIVIDERS |
872816008001 | 11/07/16 | 11/07/16 | 34.74 | |||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 5
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 215.00 | ||||||||||
| 1022 | PATTERSON, MICHAEL J. | |||||||||
| 49246 1 | 01454 | 3740 | EQUIPMENT MAINT. & REPAIR REMOVE AND REPLACE RAILINGS, DECK FLOOR BDS & FLOOR JOISTS-BOARDWALK |
103116 | 11/07/16 | 11/07/16 | 2,175.00 | |||
| 2,175.00 | ||||||||||
| 2352 | PECO - 99193-01400 | |||||||||
| 49250 1 | 01434 | 3610 | STREET LIGHTING 99193-01400 9/23-10/24/16 |
102816 | 11/07/16 | 11/07/16 | 783.27 | |||
| 49250 2 | 01433 | 2470 | UTILITIES - TRAFFIC LIGHTS 99193-01400 9/23-10/24/16 |
102816 | 11/07/16 | 11/07/16 | 668.59 | |||
| 1,451.86 | ||||||||||
| 3153 | PECO - 01360-05046 | |||||||||
| 49248 1 | 01409 | 7505 | BOOT & PAOLI LED SIGN 01360-05046 9/27-10/26/16 LED BOOT |
102816 | 11/07/16 | 11/07/16 | 48.58 | |||
| 48.58 | ||||||||||
| 1555 | PECO - 45168-01609 | |||||||||
| 49249 1 | 01409 | 3840 | DISTRICT COURT EXPENSES 45168-01609 9/22-10/21/16 GAS |
102416 | 11/07/16 | 11/07/16 | 120.94 | |||
| 49249 2 | 01409 | 3605 | PW BLDG - FUEL,LIGHT,SEWER & WATER 45168-01609 9/22-10/21/16 ELECT. |
102416 | 11/07/16 | 11/07/16 | 746.83 | |||
| 867.77 | ||||||||||
| 2591 | PECO - 59500-35010 | |||||||||
| 49247 1 | 01454 | 3600 | UTILITIES 59500-35010 9/22-10/21/16 POND PUMP |
102416 | 11/07/16 | 11/07/16 | 36.00 | |||
| 36.00 | ||||||||||
| 2986 | PENNBOC REGION 1 | |||||||||
| 49251 1 | 01487 | 4600 | TRAINING & SEMINARS-EMPLY ICC TRAINING - G. ALTHOUSE |
110116 | 11/07/16 | 11/07/16 | 40.00 | |||
| 40.00 | ||||||||||
| 1052 | PENNONI ASSOCIATES INC. | |||||||||
| 49253 1 | 01408 | 3130 | ENGINEERING SERVICES SERVICE THRU 9/25/16 SUNOCO PIPELNE |
716334 | 11/07/16 | 11/07/16 | 28.75 | |||
| 49254 1 | 01436 | 3130 | STORMWATER ENGINEERING SERVICE THRU 9/25/16 FOREST LN.CULV |
716330 | 11/07/16 | 11/07/16 | 329.25 | |||
| 49255 1 | 01408 | 3131 | ENGINEER.& MISC.RECHARGES SERVICE THRU 9/25/16 GOSHEN MEADWS. |
716325 | 11/07/16 | 11/07/16 | 705.50 | |||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 6
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 GENERAL FUND | ||||||||||
| 1052 | PENNONI ASSOCIATES INC. | |||||||||
| 49256 1 | 01408 | 3131 | ENGINEER.& MISC.RECHARGES SERVICE THRU 9/25/16 RENEHAN 1662 E |
716326 | 11/07/16 | 11/07/16 | 156.25 | |||
| 49257 1 | 01408 | 3131 | ENGINEER.& MISC.RECHARGES SERVICE THRU 9/25/16 NEW KENT APT. |
716327 | 11/07/16 | 11/07/16 | 142.50 | |||
| 49258 1 | 01408 | 3131 | ENGINEER.& MISC.RECHARGES SERV.THRU 9/25/16 MOSER-943 CORNWAL |
716328 | 11/07/16 | 11/07/16 | 200.00 | |||
| 49259 1 | 01408 | 3131 | ENGINEER.& MISC.RECHARGES SERV.THRU 9/25/16 HERSH.MILL TRAIL |
716332 | 11/07/16 | 11/07/16 | 930.00 | |||
| 49260 1 | 01408 | 3131 | ENGINEER.& MISC.RECHARGES SERV.THRU 9/25/16 DEL VACHHIO |
716335 | 11/07/16 | 11/07/16 | 1,345.00 | |||
| 3,837.25 | ||||||||||
| 1785 | PENNSYLVANIA STATE POLICE | |||||||||
| 49252 1 | 01401 | 3000 | GENERAL EXPENSE R17123075 BKGRND CHECK - C.LEYLAND |
110216 | 11/07/16 | 11/07/16 | 8.00 | |||
| 49252 2 | 01401 | 3000 | GENERAL EXPENSE R17123170 BKGRND CHECK - J.GALLELLI |
110216 | 11/07/16 | 11/07/16 | 8.00 | |||
| 49252 3 | 01401 | 3000 | GENERAL EXPENSE R17123244 BKGRND CHECK R. FALCIONE |
110216 | 11/07/16 | 11/07/16 | 8.00 | |||
| 49252 4 | 01401 | 3000 | GENERAL EXPENSE R17123281 BKGRND CHECK - B.CAMP |
110216 | 11/07/16 | 11/07/16 | 8.00 | |||
| 32.00 | ||||||||||
| 3731 | RINEHART'S SANITATION SERVICES INC. | |||||||||
| 49272 1 | 01452 | 3040 | PUMPKIN FESTIVAL 2 SINK STATIONS - PUMPKIN FESTIVAL |
114-4578866 | 11/07/16 | 11/07/16 | 142.83 | |||
| 142.83 | ||||||||||
| 2108 | SIDELINES SPORTSWEAR & PROMOTIONS | |||||||||
| 49262 1 | 01487 | 1910 | UNIFORMS FOREST GREEN SHORT & LONG SLEEVE W/ LOGO |
5277 | 11/07/16 | 11/07/16 | 389.30 | |||
| 389.30 | ||||||||||
| 1896 | SPRINGER BROTHERS INC | |||||||||
| 49264 1 | 01409 | 3840 | DISTRICT COURT EXPENSES REPAIR ROOF LEAK - DISTRICT COURT |
15805-2 | 11/07/16 | 11/07/16 | 810.00 | |||
| 810.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 7
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 3604 | SUPERIOR PLUS ENERGY SERVICES | |||||||||
| 49265 1 | 01430 | 2320 | VEHICLE OPERATION - FUEL 78.4 GALLONS GASOLINE |
734543 | 11/07/16 | 11/07/16 | 139.24 | |||
| 49266 1 | 01430 | 2320 | VEHICLE OPERATION - FUEL 343.1 GALLONS DIESEL |
742984 | 11/07/16 | 11/07/16 | 594.39 | |||
| 49267 1 | 01430 | 2320 | VEHICLE OPERATION - FUEL 100.1 GALLONS GASOLINE |
42405 | 11/07/16 | 11/07/16 | 177.68 | |||
| 49268 1 | 01430 | 2320 | VEHICLE OPERATION - FUEL 495.6 GALLONS DIESEL |
40582 | 11/07/16 | 11/07/16 | 856.30 | |||
| 1,767.61 | ||||||||||
| 1324 | T&G WINDOW CLEANING | |||||||||
| 49269 1 | 01409 | 3740 | TWP. BLDG. - MAINT & REPAIRS OCTOBER WINDOW CLEANING - TWP. |
790758 | 11/07/16 | 11/07/16 | 850.00 | |||
| 49270 1 | 01409 | 3840 | DISTRICT COURT EXPENSES OCTOBER WINDOW CLEANING -D.C. |
790759 | 11/07/16 | 11/07/16 | 150.00 | |||
| 1,000.00 | ||||||||||
| 3737 | TM MATERIALS LLC. | |||||||||
| 49271 1 | 01438 | 3845 | EQUIP. RENTAL -RESURFAC. HAULING TO MADISON DR. 10/18 &10/19 |
1067 | 11/07/16 | 11/07/16 | 1,620.00 | |||
| 1,620.00 | ||||||||||
| 2829 | VERIZON - TWP.FIOS 0001-74 | |||||||||
| 49273 1 | 01401 | 3210 | COMMUNICATION EXPENSE 10/28-11/27/16 FIOS - TWP |
0001-74 102716 | 11/07/16 | 11/07/16 | 89.99 | |||
| 89.99 | ||||||||||
| 2942 | VERIZON WIRELESS | |||||||||
| 49276 1 | 01401 | 3210 | COMMUNICATION EXPENSE SEPT.21 - OCTOBER 20,2016 WIRELESS |
9773974746 | 11/07/16 | 11/07/16 | 725.30 | |||
| 725.30 | ||||||||||
| 1983 | YALE ELECTRIC SUPPLY CO | |||||||||
| 49278 1 | 01409 | 3840 | DISTRICT COURT EXPENSES RAB MP19B 19" BLK MIGHTY POST |
S106618843.001 | 11/07/16 | 11/07/16 | 41.13 | |||
| 41.13 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 8
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 05 SEWER OPERATING | ||||||||||
| 2918 | ALS ENVIRONMENTAL | |||||||||
| 49195 1 | 05422 | 4500 | R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP - 9/27-10/11/16 |
40-2105585 | 11/07/16 | 11/07/16 | 378.00 | |||
| 49196 1 | 05422 | 4500 | R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP - 10/18-10/25/16 |
40-2108830 | 11/07/16 | 11/07/16 | 162.00 | |||
| 540.00 | ||||||||||
| 1658 | AQUA PA | |||||||||
| 49203 1 | 05420 | 3602 | C.C. COLLECTION -UTILITIES 000305003 0305003 9/26-10/27/16 WW |
103116 WW | 11/07/16 | 11/07/16 | 27.50 | |||
| 49204 1 | 05420 | 3602 | C.C. COLLECTION -UTILITIES 000363541 0357724 9/20-10/21/16 BK |
102516 BK | 11/07/16 | 11/07/16 | 16.00 | |||
| 49205 1 | 05420 | 3602 | C.C. COLLECTION -UTILITIES 000300141 0300141 9/20-10/21/16 GH |
102516 GH | 11/07/16 | 11/07/16 | 16.00 | |||
| 49206 1 | 05420 | 3602 | C.C. COLLECTION -UTILITIES 000309826 0309826 9/23-10/26/16 TH |
102816 TH | 11/07/16 | 11/07/16 | 23.00 | |||
| 49207 1 | 05422 | 3601 | R.C. COLLEC.-UTILITIES 001533998 1087842 9/23-10/26/16 TWN |
102816 TWN | 11/07/16 | 11/07/16 | 56.70 | |||
| 139.20 | ||||||||||
| 151 | BLOSENSKI DISPOSAL CO, CHARLES | |||||||||
| 49210 1 | 05422 | 4502 | R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 10/24 |
15043 | 11/07/16 | 11/07/16 | 181.00 | |||
| 49211 1 | 05422 | 4502 | R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 10/31 |
15044 | 11/07/16 | 11/07/16 | 181.00 | |||
| 362.00 | ||||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | |||||||||
| 49215 2 | 05422 | 4502 | R.C. SLUDGE-LAND CHESTER WEEK 10/24/16 - 10/31/16 |
45453 | 11/07/16 | 11/07/16 | 951.40 | |||
| 49216 2 | 05422 | 4502 | R.C. SLUDGE-LAND CHESTER WEEK 10/17/16 - 10/21/16 |
45379 | 11/07/16 | 11/07/16 | 585.58 | |||
| 1,536.98 | ||||||||||
| 627 | HIGHWAY MATERIALS INC. | |||||||||
| 49235 1 | 05422 | 3701 | R.C. COLLEC.-MAINT.& REPR 5.29 TONS 19B 3<30 - MANHOLES |
1642046MB | 11/07/16 | 11/07/16 | 209.48 | |||
| 49236 1 | 05422 | 3701 | R.C. COLLEC.-MAINT.& REPR 3.99 TONS 19B 3<30 - MANHOLES |
1641986MB | 11/07/16 | 11/07/16 | 170.17 | |||
| 49238 1 | 05422 | 3701 | R.C. COLLEC.-MAINT.& REPR 1.98 TONS 19B 3<30 |
1641953MB | 11/07/16 | 11/07/16 | 84.45 | |||
| 464.10 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 9
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 05 SEWER OPERATING | ||||||||||
| 3529 | VERIZON - MODEMS | |||||||||
| 49275 1 | 05420 | 3601 | C.C. INTERCEPTOR-UTILITIES SEPT.26 - OCTOBER 25,2016 MODEMS |
9774310463 | 11/07/16 | 11/07/16 | 81.21 | |||
| 81.21 | ||||||||||
| 2773 | VERIZON - PW FIOS 0001-15 | |||||||||
| 49274 1 | 05422 | 3601 | R.C. COLLEC.-UTILITIES 10/28-11/27/16 FIOS - PW |
0001-15 102716 | 11/07/16 | 11/07/16 | 89.99 | |||
| 89.99 | ||||||||||
| 1431 | WEST GOSHEN TOWNSHIP | |||||||||
| 49277 1 | 05420 | 3850 | C.C. WEST GOSHEN OPER/MAINT 3RD QTR. 2016 OPERATIONS & MANAGMNT |
103116 | 11/07/16 | 11/07/16 | 177,707.46 | |||
| 177,707.46 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 10
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 06 REFUSE | ||||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | |||||||||
| 49215 1 | 06427 | 4502 | LANDFILL FEES WEEK 10/24/16 - 10/31/16 |
45453 | 11/07/16 | 11/07/16 | 5,839.06 | |||
| 49216 1 | 06427 | 4502 | LANDFILL FEES WEEK 10/17/16 - 10/21/16 |
45379 | 11/07/16 | 11/07/16 | 5,279.11 | |||
| 11,118.17 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 OF 3
Report Date 11/07/16 Expenditures Register PAGE 11
GL-1611-55511
MARP05 run by BARBARA 4 : 08 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 09 Sewer Capital Reserve Fund | ||||||||||
| 2342 | POWERPRO EQUIPMENT | |||||||||
| 49261 1 | 09409 | 7400 | MACHINERY/EQUIPMENT - REPLACEMENT SCAFIER 12" & ELEC.BOXES |
P11969 | 11/07/16 | 11/07/16 | 68.50 | |||
| 68.50 | ||||||||||
| 1896 | SPRINGER BROTHERS INC | |||||||||
| 49263 1 | 09409 | 7400 | MACHINERY/EQUIPMENT - REPLACEMENT SOFFIT GUTTER SYSTEM - HUNT CNTRY. BALANCE DUE |
15806-2 | 11/07/16 | 11/07/16 | 374.37 | |||
| 374.37 | ||||||||||
| 262,449.47 | ||||||||||
| 0 Printed, totaling | 262,449.47 | |||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 69,967.49 | GENERAL FUND |
| 05 | 05 | 180,920.94 | SEWER OPERATING |
| 06 | 06 | 11,118.17 | REFUSE |
| 09 | 09 | 442.87 | Sewer Capital Reserve Fund |
| 262,449.47 |
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1611 | 262,449.47 |
| 262,449.47 |
East Goshen Township Fund Accounting
BATCH 3 OF 3
Report Date 11/10/16 Expenditures Register PAGE 1
GL-1611-55566
MARP05 run by BARBARA 9 : 21 AM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 GENERAL FUND | ||||||||||
| 2226 | 21ST CENT.MEDIA-PHILLY #884433 | |||||||||
| 49280 1 | 01401 | 3400 | ADVERTISING - PRINTING NOTICE - BUILDING INSPEC. POSITION |
1149260 | 11/10/16 | 11/10/16 | 534.36 | |||
| 49280 2 | 01401 | 3400 | ADVERTISING - PRINTING NOTICE - DAM COMMITTEES |
1157632 | 11/10/16 | 11/10/16 | 96.98 | |||
| 631.34 | ||||||||||
| 1657 | AQUA PA | |||||||||
| 49281 1 | 01411 | 3630 | HYDRANT & WATER SERVICE 000310033 0310033 9/30-10/31/16 186 |
110116 279 | 11/10/16 | 11/10/16 | 4,696.50 | |||
| 49281 2 | 01411 | 3631 | HYDRANTS - RECHARGE EXPENSE 000310033 0310033 9/30-10/31/16 93 |
110116 279 | 11/10/16 | 11/10/16 | 2,348.25 | |||
| 49282 1 | 01411 | 3630 | HYDRANT & WATER SERVICE 000309987 0309987 9/30-10/31/16 HY6 |
110116 HY6 | 11/10/16 | 11/10/16 | 137.52 | |||
| 7,182.27 | ||||||||||
| 594 | HAMMOND & MCCLOSKEY INC. | |||||||||
| 49283 1 | 01454 | 3740 | EQUIPMENT MAINT. & REPAIR REPLACE WATER VALVES & TURN OFF WATER TO PAVILION HYDRANT |
7955 | 11/10/16 | 11/10/16 | 351.88 | |||
| 351.88 | ||||||||||
| 679 | INTERCON TRUCK EQUIPMENT | |||||||||
| 49284 1 | 01430 | 2330 | VEHICLE MAINT AND REPAIR COAL DOOR LINKAGE ASSEMBLY |
1053387-IN | 11/10/16 | 11/10/16 | 78.08 | |||
| 49285 1 | 01432 | 2500 | SNOW - MAINTENANCE & REPAIRS AIR F/R/L W/ GAUGE REGULATOR |
1053380-IN | 11/10/16 | 11/10/16 | 238.04 | |||
| 316.12 | ||||||||||
| 2884 | NEOPOST | |||||||||
| 49291 1 | 01401 | 3250 | POSTAGE HI-CAPACITY INK CARTRIDGE |
PHAR1625991 | 11/10/16 | 11/10/16 | 283.00 | |||
| 283.00 | ||||||||||
| 2593 | PECO - 18510-39089 | |||||||||
| 49288 1 | 01454 | 3600 | UTILITIES 18510-39089 9/30-10/31/16 BOW TREE PUMP |
110216 | 11/10/16 | 11/10/16 | 26.81 | |||
| 26.81 | ||||||||||
East Goshen Township Fund Accounting
BATCH 3 OF 3
Report Date 11/10/16 Expenditures Register PAGE 2
GL-1611-55566
MARP05 run by BARBARA 9 : 21 AM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 1032 | PECO - 99193-01302 | |||||||||
| 49289 1 | 01409 | 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 99193-01302 9/23-10/24/16 |
110316 | 11/10/16 | 11/10/16 | 1,541.96 | |||
| 49289 2 | 01454 | 3600 | UTILITIES 99193-01302 9/23-10/24/16 |
110316 | 11/10/16 | 11/10/16 | 91.42 | |||
| 1,633.38 | ||||||||||
| 1876 | RANSOME RENTAL COMPANY LP | |||||||||
| 49292 1 | 01438 | 3845 | EQUIP. RENTAL -RESURFAC. ASPHALT ROLLER RENTL 10/17-10/24/16 |
C15852-01 | 11/10/16 | 11/10/16 | 1,891.00 | |||
| 1,891.00 | ||||||||||
| 3743 | SOLARCITY CORPORATION | |||||||||
| 49293 1 | 01362 | 4100 | BUILDING PERMITS REFUND - CANCELLED PERMIT |
110816 | 11/10/16 | 11/10/16 | 209.35 | |||
| 209.35 | ||||||||||
East Goshen Township Fund Accounting
BATCH 3 OF 3
Report Date 11/10/16 Expenditures Register PAGE 3
GL-1611-55566
MARP05 run by BARBARA 9 : 21 AM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 05 SEWER OPERATING | ||||||||||
| 594 | HAMMOND & MCCLOSKEY INC. | |||||||||
| 49283 2 | 05422 | 3702 | R.C. COLLECTION-MAINT. & REP I&I DISCONNECT HOSE FAUCET & INSTALL TEMP HOSE - THORNCROFT |
7955 | 11/10/16 | 11/10/16 | 116.00 | |||
| 116.00 | ||||||||||
| 2255 | MCGOVERN ENVIRONMENTAL LLC | |||||||||
| 49286 1 | 05422 | 3700 | R.C. STP-MAINT.& REPAIRS CLEAN SBR TANKS |
E-94569 | 11/10/16 | 11/10/16 | 2,810.00 | |||
| 49287 1 | 05422 | 3700 | R.C. STP-MAINT.& REPAIRS CLEAN SBR TANKS |
E-94570 | 11/10/16 | 11/10/16 | 2,875.00 | |||
| 5,685.00 | ||||||||||
| 1031 | PECO - 99193-01204 | |||||||||
| 49290 1 | 05420 | 3602 | C.C. COLLECTION -UTILITIES 99193-01204 9/23-10/24/16 |
110316 | 11/10/16 | 11/10/16 | 462.62 | |||
| 49290 2 | 05420 | 3600 | C.C. METERS - UTILITIES 99193-01204 9/23-10/24/16 |
110316 | 11/10/16 | 11/10/16 | 10.08 | |||
| 49290 3 | 05422 | 3601 | R.C. COLLEC.-UTILITIES 99193-01204 9/23-10/24/16 |
110316 | 11/10/16 | 11/10/16 | 72.18 | |||
| 49290 4 | 05422 | 3600 | R.C STP -UTILITIES 99193-01204 9/23-10/24/16 |
110316 | 11/10/16 | 11/10/16 | 9,469.28 | |||
| 10,014.16 | ||||||||||
| 28,340.31 | ||||||||||
| 0 Printed, totaling | 28,340.31 | |||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 12,525.15 | GENERAL FUND |
| 05 | 05 | 15,815.16 | SEWER OPERATING |
| 28,340.31 |
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1611 | 28,340.31 |
| 28,340.31 |
[Logo: verizon]
777 East Park Drive
2nd Floor
Harrisburg, PA 17111
Phone (717) 562-5052
janet.miller@verizon.com
October 31, 2016
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Verizon Fios TV Significant Outage
Dear Municipal Official:
This letter serves as notice required by the Customer Service Standards set forth in the Cable Franchise Agreement entered into between Verizon Pennsylvania LLC (“Verizon”) and East Goshen Township.
Due to problems experienced by the provider, content was unavailable to Verizon video subscribers on Channels 26 (WFPA UniMás), 495 (WUVP GetTV), and 514 (WUVP Univision HD) between approximately 11:00 p.m. on Thursday, October 6, 2016, and 4:00 a.m. on Friday, October 7, 2016.
Please call me if you have questions regarding this notice or any other Fios TV service matter.
Sincerely,
Janet Miller
Janet Miller
Verizon Fios TV
Franchise Service Manager
cc: Kristin S. Camp, Esquire
NOV - 9 2016
Rick Smith
From: sisayeff@eastgoshen.org
Sent: Thursday, November 03, 2016 2:04 PM
To: Redacted-Redacted
Cc: cbattavio@eastgoshen.org; cproctor@eastgoshen.org; jemanuel@eastgoshen.org; mshane@eastgoshen.org; rsmith@eastgoshen.org
Subject: RE: Meeting/Trail 11/1 meeting
Dear Mr. Buonanno,
Good afternoon and thank you for your email.
Your thoughts and comments, as always, are greatly appreciated and welcome to be shared at a Public Meeting for the benefit of our fellow residents and a public discussion.
Thank you again and have a great day,
Senya D. Isayeff
Chairman
Board of Supervisors
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
610-842-4241 (Cell)
-----Original Message-----
From: Redacted-Redacted
Sent: Thursday, November 3, 2016 1:31pm
To: sisayeff@eastgoshen.org, cbattavio@eastgoshen.org, cproctor@eastgoshen.org, jemanuel@eastgoshen.org, mshane@eastgoshen.org, rsmith@eastgoshen.org
Subject: Meeting/Trail 11/1 meeting
Gentlemen/Madam, Last night's meeting was well orchestrated well staged theater. The audience was impressive. The audience was very enthusiastic...Obviously well learned/well practiced concerning a good multi act stage play....I was impressed. Most were paid employees, paid consultants, volunteer consultants and most importantly many committee members who share/execute the visions of the BOS who work.. plan and support those same BOS visions......I really enjoyed Supervisor Isayeff dissertation of Ken Knickerbocker's opinion about realizing opportunities via business cycles. I know he admires Mr. Knickerbocker as both a consultant and friend. The Vista publications surely demonstrates his business acumen related to those same business cycles. I realize/recognize the committee members are residents of East Goshen......other former members of various committees are also residents....All these committee members ....The Park and Rec Board ,the Historical committee, the Commerce Committee, etc etc ..It's very comforting to know how many residents give their time intellectual property and financial resources to
1
the BOS and our Community. I for one am very appreciative/thankful of their service to our community.....I still maintain the issue of the trail runs through it ...the park that is......should be put on a referendum so the residents of East Goshen can vote on all discretionary spending that requires a bond issue. It is my opinion, The BOS is charged to conduct the business of the township according to the charter of a PA. class 2 township......all necessary expenditures/payments for maintenance experience and capitol costs required by the township...... via Tax revenue and fees.... Visions/Dreams/execution of comprehensive plans.....large debit etc etc should be voted on by ALL the people of East Goshen not just notified by/via a 1000 ft rule of residents impacted by a Vision......almost sounds like Sunoco's guidelines..........
Who signed the letter from the BOW TREE CIVIC ASSOC..........dated 11/1.......to Mr. Smith......There are numerous HIGH TRAFFIC driveways parking lots and sidewalks the trail crosses.....I have a vision of a group of 10 year olds, LEGAL MINORS, CANNOT BE FOUND NEGLIGENT, LATE FOR SCHOOL as you see it, blasting down the path on dirt bikes.......crossing... what ......9 10 driveways one of which IS A SCHOOL! WHOSE CARS ARE LINED UP TO ENTER EG ELEMENTARY to drop kids off.........SWISS FARMS is a DRIVE THRU business, WAWA, THE SCHOOL, and you can't forget the dunkin donnuts......All these things occur AT THE SAME TIME >>>>>RUSH HOURS.....Breakfast Lunch Dinner.......I have found during the years most properties are net net leases or even net net net leases......I cannot see WAWA corp. risk management dept going for this idea/vision......Do think an indemnification agreement, a hold harmless or any other legal concoction will convince these corps to accept a fair and proper property value.....do you think for one Nano second the subject of municipal sovereign immunity, a Landlord cannot delegate their responsibility and EG liability carrier will not come up? May the force be with you.......I think a better name for the trail would be 5-0 road.......I await your response......J Buonanno
PS I read the minutes for 10/18......line 28......page 2 of 6 ........borders fictitious....it should be changed to reflect actual vs. imaginary.
2
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Date: November 9, 2016
To: Board of Supervisors
From: Rick Smith, Township Manager RS
Re: Sunoco Remediation Report
We received the Remedial Action Progress Report for the Third Quarter of 2016 from Sunoco and 1 of the monitoring wells has a MTBE reading above the State Limit (20 ug/l). This well is located on the Sunoco property.
The executive summary is attached and a complete copy of the report is available for review at the Township Building.
F:\Data\Shared Data\Property Management\53-4\53-4-2 (1431 Paoli Pike)\Sunoco\Memo to BOS 110916.doc
Remedial Action Progress Report
Third Quarter 2016
Sunoco Station # 0004-7969
1425 Paoli Pike
West Chester, PA
GENERAL INFORMATION
| Sunoco Remediation Associate: | Bill Brochu |
|---|---|
| Consultant: | Environmental Alliance, Inc. (Alliance) 5341 Limestone Road Wilmington, DE 19808 |
| Alliance Program Manager: | Joe Rossi |
| Alliance Project Manager: | Chris Thoeny |
| PADEP Case Manager: | Lauren Mapleton – PADEP Southeast Regional Office |
| PADEP Facility ID#: | 15-20353 |
| County: | Chester |
| Municipality: | East Goshen Township |
SITE OVERVIEW
- The site is an active retail gasoline station and A-Plus convenience store.
SITE HISTORY
- In July of 1989, Sunoco retained Groundwater and Environmental Services, Inc. (GES) to conduct a hydrogeologic investigation upon the acquisition of the Site. GES installed four monitoring wells, collected soil samples, and completed an initial groundwater sampling event. Analytical results indicated the presence of total BTEX and total petroleum hydrocarbons (TPH) in the two samples that were located nearest the underground storage tank (UST) field.
- In the fall of 1989, Sunoco upgraded the UST system onsite. Upgrade activities included: the removal of four 4,000 gallon steel USTs which were replaced with three 10,000 gallon fiberglass USTs and the removal of two 550 gallon heating and waste oil tanks that were replaced with two 275 gallon aboveground storage tanks (ASTs).
- In December 1992 and January 1993, Sunoco completed service station upgrades, which included the abandonment of the on-site water supply well.
- In January 1995, the Pennsylvania Department of Environmental Resources (PADER) issued a letter in which no further investigative activities were deemed necessary. Subsequently, all monitoring wells were abandoned by B. L. Myers on January 27, 1995.
- In October 2006, Sunoco upgraded the dispensers and product piping at the Site. During upgrade activities contamination was detected beneath one of the dispensers and was confirmed through a grab soil sample. Benzene was detected above Pennsylvania Department of Environmental Protection (PADEP) statewide health standard (SHS) and a notice of release (NOR) was submitted to the PADEP by Alliance on October 16, 2006.
Page 1
[Logo: ENVIRONMENTAL ALLIANCE, INC.]
- On January 17 th and 18 th , 2007, Alliance conducted soil borings and the installation of four monitoring wells. The monitoring wells were sampled on February 6 th and April 25 th , 2007.
- In August 2007, Alliance submitted a Site Characterization Report (SCR) to the PADEP. The SCR was disapproved based on further site characterization being needed.
- On September 19 th and 20 th , 2007, Alliance installed an additional four monitoring wells to help further delineate any potential migration of contaminants of concern.
- In accordance with a letter from the PADEP dated March 3, 2008, Alliance conducted an extensive well search, in which no drinking wells were identified between the Site and the closest down-gradient sensitive receptor, Ridley Creek.
- On September 3, 2008, Alliance installed two offsite monitoring wells and one onsite monitoring well. The offsite wells (MW-9 and MW-10) were installed for further horizontal delineation of potential contaminants of concern. The onsite well (MW-7B) was installed for vertical delineation of potential contaminants of concern.
- In December 2008, a slug test was performed on monitoring well MW-7B to calculate the hydraulic conductivity of the bedrock aquifer beneath the site.
- On May 27 th and 28 th , 2009 Alliance installed additional overburden and shallow bedrock wells at off site (MW-9 and 9B, MW-10 and 10B, and MW-11 and MW-11B) and onsite locations (MW-2B and MW-8B).
- On November 3 rd through 5 th , 2009 Alliance installed additional monitoring wells onsite (MW-12, MW-12B and MW-5B) and off site (MW-13 and 13B and MW-14 and 14B).
- On November 9, 2009, Alliance submitted a Status Report for Site Characterization to the PADEP.
- On February 1, 2010, Alliance submitted a Site Characterization Report (SCR) to the PADEP selecting the Site Specific Standard (SSS) as the clean up standard for the site. The SCR was approved by the PADEP in a letter dated April 21, 2010.
- On June 10, 2010, Alliance submitted a Remedial Action Plan (RAP) to the PADEP in which a groundwater pump and treat remediation system was selected as the remedial strategy for the site. The RAP was approved by the PADEP in a letter dated July 21, 2010.
- Start up/shake down procedures for the groundwater remediation system were initiated on June 15, 2010. The permanent operation date for the groundwater remediation system was June 28, 2010.
- Routine Operation and Maintenance (O&M) of the remediation system was initiated following permanent operation.
- On August 28, 2012, Alliance submitted a request to PADEP by e-mail on behalf of Sunoco, to modify the groundwater sampling plan during active remediation to a reduced list of wells. PADEP agreed to a reduced groundwater sampling plan per an August 28, 2012 e-mail. The following wells were removed from the quarterly groundwater sampling scope MW-2 & 2B; MW-5 & 5B; MW-9 & 9B; MW-10 & 10B; MW-13 &13B. The wells were left in place, secured with a water tight manhole and locking well plug.
Page 2
[Logo: ENVIRONMENTAL ALLIANCE, INC.]
- A Notice of Intent (NOI) was submitted to PADEP on September 6, 2012, for renewal of the NPDES Permit, to continue operation of the remediation system. Coverage under the statewide permit was extended in a letter from PADEP dated October 24, 2012.
- On September 27 2012, Alliance installed a regenerative air blower at the Site to aid in sub-surface remediation. The blower was installed in the remediation shed, and tied into piping runs connected to MW-7B. The purpose of the blower was to provide additional hydraulic influence at well MW-7B and possibly extract hydrocarbon vapors from the de-watered bedrock surrounding MW-7B. All extracted vapors were passed through activated vapor-phase granular carbon prior to discharge to the atmosphere.
- Per the November 26, 2013 letter submitted to PADEP (Notification of Suspension of Remedial Actions), the remediation system was temporarily shutdown on December 31, 2013. Per the notification, the system would remain off for at least one quarter while the aquifer response is evaluated.
- The remediation system was restarted on April 18, 2014.
- On December 31, 2014, the remediation system was shut down indefinitely to further evaluate baseline MTBE concentrations and trends at the Site.
- On March 29, 2016, monitoring wells MW-5, MW-6, MW-9 and MW-9B were abandoned by a Pennsylvania licensed well driller (Eichelberger’s Inc.). These wells were abandoned based on a potential conflict with the proposed installation of a Sunoco pipeline along East Boot Road. Abandonment was approved by PADEP via email correspondence dated March 15, 2016.
SITE INFORMATION
| Well Specifications: | Eleven 2-inch diameter overburden monitoring wells (MW-1 through MW-4, MW-7, MW-8, MW-10 through MW-14); Six 2-inch diameter shallow bedrock wells (MW-2B, MW-10B, MW-11B, MW-12B, MW-13B, & MW-14B); Two 6-inch diameter deep wells (MW-7B, & MW-8B). |
|---|---|
| Geology: | Soils consist of greenish gray and orange clay and micaceous silt underlain by Precambrian age, medium grained felsic gneiss. Depth to bedrock reported during drilling ranged from 20-feet (MW-14B) to 48-feet (MW-8B). Bedrock is gradationally overlain by a thick mantle of saprolite identified in most borings. |
| Groundwater Elevation: | Overburden: 81.61 feet (MW-12) to 74.26 feet (MW-14). Shallow Bedrock: 81.86 feet (MW-5B) to 74.29 feet (MW-14B). |
| Hydraulic Gradient: | Shallow: 0.014 feet per foot to the northeast. Deep: 0.014 feet per foot to the northeast. |
| Hydraulic Conductivity: | 4.75 feet per day (shallow); 1.75 feet per day (deep). |
| Groundwater Sampling Frequency: | Quarterly. |
| Analytical Method: | Benzene, Toluene, Ethylbenzene, Total Xylenes (BTEX), Methyl tertiary-butyl ether (MTBE), Isopropylbenzene, Naphthalene via Environmental Protection Agency (EPA) Method 8260B. |
Page 3
[Logo: ENVIRONMENTAL ALLIANCE, INC.]
| Soil Quality: | Soil quality data from October 2006 dispenser sampling indicated Benzene above SHS at sample Disp/Line 2. Soil quality data from well installation in January 2007, indicated MTBE above SHS at MW-3 (11-12 feet). |
|---|---|
| Separate-Phase Hydrocarbons: | Separate-phase hydrocarbons (SPH) have never been detected in the site monitoring wells. |
RISK ASSESSMENT
| Potentially Sensitive Receptors: | There are 34 known wells identified by the Environmental Data Resources, Inc. radius report (utilizing the Federal and Pennsylvania well databases) within a 0.5-mile radius. The East Branch of Ridley Creek lies approximately 900 feet northeast of the site. |
|---|---|
| Closest Known Well: | One Federal Public Supply well was identified within a one-half mile radius to the east of the site. |
| Municipal Water Supply: | Aqua Pennsylvania, Inc. |
SITE ACTIVITIES THIS REPORTING PERIOD
- A groundwater sampling event was completed on July 11, 2016 and included collection of liquid-level data from all onsite and off-site wells and collection of groundwater quality samples from MW-1, MW-3, MW-4, MW-7, MW-7B, MW-11, MW-11B, MW-12, MW-12B, MW-14, and MW-14B (per reduced scope).
- Maps depicting groundwater elevation and analytical data for the shallow (overburden) and deep (shallow bedrock) monitoring wells are included as Figures 1 and 2, respectively. Historical groundwater elevation and analytical data are summarized in Table 1. A copy of the laboratory results is included in Appendix A. Graphs showing the concentration history of MTBE at select monitoring wells are presented in Appendix B.
- The remediation system remained off for the third quarter 2016. Therefore, no discharge monitoring reports were submitted in July, August, and September 2016 in accordance with the National Pollutant Discharge Elimination System (NPDES) Permit for the Site.
- On September 9, 2016, monitoring well MW-5B was abandoned by a Pennsylvania licensed well driller (Eichelberger’s Inc.). This well was abandoned based on a potential conflict with the proposed installation of a Sunoco pipeline along East Boot Road.
REMEDIATION SYSTEM INFORMATION
- Type of System: Vacuum Enhanced Groundwater Extraction (VEGE).
- Permanent Operation Dates: Groundwater: June 28, 2010 to December 31, 2013; April 18, 2014 to December 31, 2014.; SVE: September 27, 2012 to December 23, 2012; March 19, 2013 to December 31, 2013; May 22, 2014 to December 31, 2014.
- Extraction Points: MW-1, MW-2, and MW-7B.
Page 4
[Logo: ENVIRONMENTAL ALLIANCE, INC.]
- Extraction Points Utilized: MW-7B.
- Recovery Equipment: Grundfos ES-7 Electric Submersible Pump & Gast R4 SVE blower.
- Liquid-Phase Treatment Equipment: GeoTech Lo-Profile Air Stripper, (2) 200 lb. liquid granular activated carbon (LGAC) vessels.
- Vapor-Phase Treatment Equipment: vapor-phase granular activated carbon.
- Groundwater Discharge Location: Storm Sewer.
- Approximate gallons pumped and treated this Reporting Period: 0
- Average Groundwater Recovery Rate this Reporting Period: 0 GPM.
- Total Groundwater Recovered through December 31, 2014: 3,665,497 gallons. Totalizer replaced 04/18/14 at 1,363,333 gallons.
- Total Dissolved-Phase MTBE Recovered through December 31, 2014: 128.19 pounds.
FUTURE SITE ACTIVITIES
- Quarterly groundwater monitoring and sampling will continue using the August 28, 2012 revised sampling plan. The next sampling event is scheduled for October 2016.
- Operation of the remediation system has been suspended as of December 31, 2014 to evaluate non-pumping aquifer conditions.
- Based on the suspension of operation of the remediation system monthly no Discharge Monitoring Reports (DMR) will be submitted this period.
ATTACHMENTS
| Figure 1 | Groundwater Analytical and Gradient Map - Overburden (Shallow) Wells July 11, 2016 |
|---|---|
| Figure 2 | Groundwater Analytical and Gradient Map - Shallow Bedrock (Deep) Wells July 11, 2016 |
| Table 1 | Groundwater Elevation Data and Analytical Summary |
| Appendix A | Groundwater Sampling Laboratory Analytical Reports |
| Appendix B | Groundwater Concentration Graphs |
Page 5
[Logo: ENVIRONMENTAL ALLIANCE, INC.]