Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS

Tuesday, January 10, 2017
7:00pm

  1. Call to Order
  2. Pledge of Allegiance
  3. Moment of Silence – Supervisor Carmen Battavio
  4. Ask if anyone is recording the meeting
  5. Chairman’s Report Announce applications for the vacant position on the Board will be accepted until January 13, 2017 at 12 noon.
  6. Public Hearing – none
  7. Emergency Services Reports WEGO – none Goshen Fire Co - none Malvern Fire Co – none Fire Marshal – none
  8. Financial Report – none
  9. Old Business - none
  10. New Business – Consider the location of the breach at the Hershey Mill Dam.
  11. Any Other Matter
  12. Approval of Minutes -none
  13. Treasurer’s Report – none
  14. Correspondence, Reports of Interest - none
  15. Public Comment – Hearing of Residents
  16. Adjournment

The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.

Dates of Importance

Date Meeting Time
Jan 09, 2017 Municipal Authority 7:00 pm
Jan 10, 2017 Board of Supervisors (HM Dam) 7:00 pm
Jan 11, 2017 Conservancy Board 7:00 pm
Jan 11, 2017 Milltown Dam Committee 7:00 pm
Jan 12, 2017 Historical Commission 7:00 pm
Jan 16, 2017 Martin Luther King Day Office Closed
Jan 17, 2017 Board of Supervisors 7:00 pm
Jan 17, 2017 Hershey Mill Dam Committee 6:30 pm
Jan 25, 2017 Milltown Dam Committee 7:00 pm
Jan 26, 2017 Hershey Mill Dam Committee 7:00 pm

Newsletter Deadlines for Spring of 2017: February 1st

F:\Data\Shared Data\Agendas\Board of Supervisors\2017\011017 HM Dam Meeting.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 14, 2016

Dear Resident:

The Board of Supervisors has contracted with Gannett Fleming to perform the engineering required to obtain the permit from the PA Department of Environmental Protection to breach the Hershey Mill Dam. Gannett Fleming has determined that we do not need to remove the entire dam. Rather, the breach would only have to be 15 feet wide at the bottom. The sides would then slope up gradually to the top of the dam. They have also concluded that there are two options for the location of the breach.

The first option would locate the breach at the existing spillway, which would require the removal of the existing stone spillway. For perspective, the existing spillway is 22 feet wide, so the entire stone spillway would be removed. Under this option, there would be no change to the stream channel downstream of the dam.

The second option would locate the breach to the east (or right side of the spillway, when viewing the dam from Greenhill Road) of the existing spillway. Under this option, the existing stone spillway would remain. However, this option would require that a section of stream channel downstream of the dam be relocated. I would add that Simone & Collins, whom the Township has hired to develop a plan on what can be done with the area above the dam after the dam is breached, is exploring the feasibility of piping the normal stream flow over the stone spillway. Under this concept, the waterfall would return; however, all storm events would essentially be bypassed around the stone spillway.

In order for residents to have a perspective of what the two options would look like, we have marked the appropriate limits of each breach at the dam. If you view the dam from Greenhill Road, the first option (removal of the existing stone spillway) is marked with florescent green tape. The second option (locating the breach east of the existing spillway) is marked with florescent orange tape.

In accordance with Township policy, this letter is being sent to the owners of property within 1,000 feet of the dam to advise you that Gannett Fleming will update the Board and residents about the two options at a meeting on Tuesday, January 10, 2017 @ 7 pm at the Township Building. The purpose of the meeting is to review and discuss the two options and for the Board to make a decision about the location of the breach for the Hershey Mill Dam.

Information on the Hershey Mill Dam is available under the “About Us” tab at the Township website (www.eastgoshen.org).

Sincerely,

[Signature: Rick]
Louis F. Smith, Jr.
Township Manager

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Breaching\1,000 foot letter 121216.doc

[Concept Plan drawing overlaid on photograph: Decommissioning of Hershey's Mill Dam, Breach Exhibit Option 1, prepared by Gannett Fleming for East Goshen Township, Chester County, Pennsylvania, December 2016, Job No. 60466, Sheet No. 1 of 2. Shows proposed dam breach demolition area in red highlighting over existing stone spillway.]

CONCEPT PLAN

EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
DECOMMISSIONING OF HERSHEY'S MILL DAM
BREACH EXHIBIT OPTION 1

Gannett Fleming
Job No.: 60466
Sheet No.: 1 OF 2
Date: DEC. 2016
Scale: AS SHOWN
Designed: ECN | CADD: XXX | Drawn: XXX | Checked: XXX | Approved: XXX

Labels and Notes:

  • LIMIT OF DEMOLITION
  • TOP OF DAM CREST
  • 23'± SPILLWAY
  • EL. 446.8±
  • EL. 437±
  • 15' MINIMUM BOTTOM WIDTH
  • 44'±, 40'±, 48'±, 44'±
  • Slope: 1 on 4

[Concept Plan drawing overlaid on photograph: Decommissioning of Hershey's Mill Dam, Breach Exhibit Option 2, prepared by Gannett Fleming for East Goshen Township, Chester County, Pennsylvania, December 2016, Job No. 60466, Sheet No. 2 of 2. Shows proposed dam breach demolition area in red east of the existing stone spillway, with new cobblestone stream channel bordered in green leading to culvert under Green Hill Road, and existing stream channel filled in.]

CONCEPT PLAN

EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
DECOMMISSIONING OF HERSHEY'S MILL DAM
BREACH EXHIBIT OPTION 2

Gannett Fleming
Job No.: 60466
Sheet No.: 2 OF 2
Date: DEC. 2016
Scale: AS SHOWN
Designed: ECN | CADD: XXX | Drawn: XXX | Checked: XXX | Approved: XXX

Labels and Notes:

  • LIMIT OF DEMOLITION
  • TOP OF DAM CREST
  • BOTTOM OF EMBANKMENT
  • 23'± SPILLWAY
  • 20'
  • 44'±, 44'±
  • 15' MINIMUM BOTTOM WIDTH
  • EL. 446.8±
  • EL. 448±
  • EL. 437±
  • Slope: 1 on 4
  • FILL IN EXISTING STREAM CHANNEL
  • NEW STREAM CHANNEL TO CULVERT UNDER GREEN HILL ROAD