Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, January 16, 2018
7:00 PM
6:00 PM Executive Session -Personnel Matter
1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence - Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chairman's Report a. Announce that the Board met in executive session prior to tonight's meeting to discuss a personnel matter. 6. Public Hearing - none 7. Emergency Services Reports WEGO - Chief Brenda Bernot Goshen Fire Co - none Malvern Fire Co - 2017 EMS Statistics Fire Marshal - none 8. Financial Report - 4th Quarter 2017 9. Old Business - none 10. New Business a. Consider installing temporary speed humps in Wyllpen Farms. b. Consider approval of the Land Development Plan for East Goshen Elementary School c. Consider 1665 E. Boot Road Dimensional Variance. d. Consider approval of the Paoli Pike Trail Easement Plan. e. Consider 2018 Group Bids f. Consider Stormwater Management Agreements for 1551 Colonial Lane and 907 Madison Drive. g. Consider the appointment of Thornbury Township Supervisor Jim Benoit as the Member- at-Large on the Police Commission. 11. Any Other Matter 12. Approval of Minutes a. January 2, 2018 b. January 6, 2018 c. January 9, 2018 13. Treasurer's Report-January 11, 2018 14. Liaison Reports -none 15. Conespondence, Repmts of Interest a. December 22, 201 7 - Letter from FEMA b. 4th Quarter Right to Know Report 16. Public Comment 17. Adjournment
AGENDA Page -1- JANUARY 16, 2018
Meetings & Dates of Importance
Jan 15, 2018 Jan 16,2018 Jan 16, 2018 Jan 17, 2018
Jan 22, 2018 Jan 22, 2018
Jan 23, 2018
Martin Luther King Jr Day Office Closed Pension Committee lO:OOam Board of Supervisors 7:00 pm Planning Commission 7:00 pm Malvern Institute Special Exception & Variance Futurist Committee 7:00pm Municipal Authority 7:00 pm (meeting was rescheduled) Board of Supervisors 7:00 pm Malvern Institute Special Exception & Variance
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant.
Public Comment-Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an oppmiunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting.
Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay infmmed about impmiant local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the "E-notification & Emergency Alert" button on the left side of the homepage. Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!
Smart 911 - Smaii911 is a new service in Chester County that allows you to create a Safety Profile at www.smart911.com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that info1mation automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members' allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search start faster.
F:\Data\Shared Data\Agendas\Board of Supervisors\2018\0I092018 Meeting.doc
AGENDA Page -2- JANUARY 16, 2018
Malvern Fire Company 4 24 East King Street Malvern, PA 19355
East Goshen Township
2017 EMS Statistics
December:
54 Calls: 7 BLS (5 Transports); 47 ALS (36 Transports)
November:
39 Calls; 3 BLS (1Transport);36 ALS (24 Transports)
October:
45 Calls; 5 BLS (5 Transports); 40 ALS (28 Transports)
September:
44 Calls; 9 BLS (6 Transports); 35 ALS (28 Transports)
August:
36 Calls; 6 BLS (6 Transports); 30 ALS (26 Transports)
July:
37 Calls; 2 BLS (1 Transport); 35 ALS (22 Transports)
June:
48 Calls; 5 BLS (4 Transports); 42 ALS (28 Transports)
May:
37 Calls; 5 BLS (4 Transports); 32 ALS (24 Transports)
April:
41 Calls; 5 BLS (4 Transports); 36 ALS (20 Transports)
March:
44 Calls; 5 BLS (5 Transports); 39 ALS (33 Transports)
February:
43 Calls; 8 BLS (7 Transports); 35 ALS (22 Transports)
January:
37 Calls; 8 BLS (6 Transports); 29 ALS (23 Transports)
Main 610-647-0693 Fax 610-647-0249 www.malvemfireco.com
Memo
To: Board of Supervisors From: Jon Altshul Re: 2017 Year-End Financial Report Date: January 8, 2017
Net of pass-through accounts, as of December 31
5 \ the general fund had revenues of $10,972,558 and expenses of $10,542,983 for a surplus of $429,576. Compared to the YTD budget, revenues were $645,342 over budget and expenses were $222,945 under budget for a favorable budget variance of $868,288. As of December 31st, the general fund balance was $5,531,289.
On the expense side, Public Works was under budget by $115,323 on account of the mild snowfall and lower than expected storm water expenses. Administration was $85,722 under budget due to deferring the vehicle wash bay and storefront projects until 2018. Emergency Services was $12,763 over budget due to higher than expected workers compensation costs for volunteer firefighters, which we are required to pay for pursuant to Section 1512 of the Second Class Township Code. Codes was $27,237 over budget due to lower than expected permit revenue. Parks & Recreation was $53,223 over budget due to park maintenance personnel costs.
On the revenue side, Real Estate Transfer Tax finished $684,969 over budget due to the sale of a large commercial building in March and continued strong residential sales throughout the year; Earned
Income Tax finished the year $63,500 over budget. Other Income, which includes interest income, finished the year $29,354 over budget due to rising interest rates.
Other funds
• The State Liquid Fuels Fund had $531,073 in revenues and $530,873 in expenses. The fund balance was $502. • The Sinking Fund had $1,162,633 in revenues and $1,217,877 in expenses. The fund balance is $6,024,031. • The Transportation Fund had $6,881 in revenues and $2,583 in expenses. The fund balance is $1,079,157. • The Sewer Operating Fund had $3,730,640 in revenues and $3,396,144 in expenses. This surplus is a one-time anomaly due to having five due dates in 2017. The fund balance is $886,672. • The Refuse Fund had $1,053,086 in revenues and $1,055,865 in expenses, despite the fact that we did not receive any Act 101/Section 904 funding from the state this year. The fund balance is $614,128. • The Bond Fund had $8,126,213 in revenues and $789,890 in expenses. The fund balance is $7,336,323. • The Sewer Sinking Fund had $223,438 in revenues and $144,623 in expenses. The fund balance
is $2,162,678. • The Operating Reserve Fund had $13,751 in revenues and no expenses. The fund balance is $2,504,354.
2017 Series GO Bonds As of December 31st, $789,900 had been drawn down on the 2017 bond proceeds, or 9.41% of the total
proceeds. Note that we must have drawn down 10% of the proceeds by mid-February to be eligible for an exemption from the interest rate arbitrage requirement. However, even if we meet this threshold- which is very likely-it is much less likely that we will have spent 45% of the proceeds by August 15th,
2018 (the one-year anniversary of the closing), which is the next benchmark. Breaching the arbitrage exemption threshold isn't a problem per se, but it will require us to work closely with PLGIT to calculate any arbitrage refund that might be due to the IRS in the future.
Accounts Receivable Utilities receivables stood at $232,782 as of December 31th, which is essentially unchanged from three months earlier. Real estate tax receivables were $9,652, which is somewhat higher than what's it's been over the last 3 years.
Yield The average yield on Township funds is 1.05%. Rates have been on a steady upwards trajectory, with one-year CDs and term deposits yielding 1.8%-1.9%. The yield curve is very flat right now and 6-month rates are only nominally lower than 12-month rates.
EAST GOSHEN TOWNSHIP
2017 YEAR-END UNAUDITED GENERAL FUND SUMMARY
As of December 31, 2017
- . 2017 2017
Account Title Budget Actual Variance
EMERGENCY SERVICES EXPENSES 4,520,632 4,543,688 (23,056)
PUBLIC WORKS EXPENSES 2,615,463 2,435,170 180,293
ADMINISTRATION EXPENSES 1,883,346 1,796,221 87,125
CODES EXPENSES 413,748 424,069 (10,321)
PARK AND RECREATION EXPENSES 682,542 675,456 7,086
TOTAL CORE FUNCTION EXPENSES 10,115,731 9,874,603 241,128
EMERGENCY SERVICES REVENUES 61,480 71,773 10,293
PUBLIC WORKS REVENUES 1,005,147 940,177 (64,970)
ADMINISTRATION REVENUES 377,720 376,317 (1,403)
CODES REVENUES 279,875 262,958 (16,917)
PARK AND RECREATION REVENUES 272,435 212,125 (60,310)
TOTAL CORE FUNCTION REVENUES 1,996,657 1,863,351 (133,307)
NET EMERGENCY SERVICES 4,459,152 4,471,915 (12,763)
NET PUBLIC WORKS 1,610,316 1,494,993 115,323
NET ADMINISTRATION 1,505,626 1,419,904 85,722
NET CODES 133,873 161,110 {27,237)
NET PARK AND RECREATION 410,107 463,330 {53,223)
lcoRE FUNCTION NET SUBTOTAL 8,119,074 8,011,253 101,s21 I
DEBT - PRINCIPAL 520,999 521,000 (1)
DEBT - INTEREST 129,198 147,380 (18,182)
ITOTALDEBT 650,197 668,380 (18,183)1
lroTAi CORE FUNCTION NET 8,769,271 8,679,632 89,6391
NON-CORE FUNCTION REVENUE
EARNED INCOME TAX 4,916,400 4,979,900 63,500
REAL ESTATE PROPERTY TAX 2,027,128 2,028,636 1,508
REAL ESTATE TRANSFER TAX 525,000 1,209,969 684,969
CABLE TELEVIS.FRANCHISE 473,690 476,562 2,872
LOCAL SERVICES TAX 348,000 344,447 (3,553)
OTHER INCOME 40,341 69,695 29,354
!TOTAL NON CORE FUNCTION REVENUE 8,330,559 9,109,208 778,6491
NET RESULT {438,712) 429,576 868,288 .
U:\JAltshul\Quarterly reports\Q4 2017\2017 -12 - General Fund Summary.xlsx
RECEIP 310 320 330 340 350 360 380 390
01/01/17 BEGINNING BALANCE
rs
TAXES LICENSES & PERMITS FINES & FORFEITS INTERESTS & RENTS INTERGOVERNMENTAL CHARGES FOR SERVICES MISCELLANEOUS REVENUES OTHER FINANCING SOURCES
EXP EN 400 410 420 426 430 450 460 470 480 490
DITURES
GENERAL GOVERNMENT PUBLIC SAFETY HEAL TH & WELFARE SANITATION & REFUSE HIGHWAYS.ROADS & STREETS CULTURE-RECREATION CONSERVATION & DEVELOPMENT DEBT SERVICE MISCELLANEOUS EXPENDITURES OTHER FINANCING USES
2017 SURPLUS/(DEFICIT)*
CLEARING ACCOUNT ADJUSTMENTS
12/31/2017 ENDING BALANCE
GENERAL
FUND*
$5,099,106
$9,089,293
$32,697 $44,375 $167,719 $137,931 $614,748 $1,542,148
$960,455
$12,589,367
$1,414,610 $6,303, 178
$6,000 $109,985 $2,117,648
$609,037
$4,283 $691,345 $902,086
$0
$12,158,174
431,193
$990
$51531,289
SUMMARY OF FUNDS REPORT (AKA "JOE REPORT")
ALL FUNDS DECEMBER 2017 *NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
LIQUID FUELS SINKING TRANSPORT. SEWER OP. REFUSE SEWER SINK STATE FUND FUND FUND FUND FUND FUND
$302 6,079,275 1,074,859 552,175 616,907 $2,083,864
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,562 $48,310 $5,296 $1,084 $5,481 $223,438 $525,511 $291,005 $0 $0 $0 $0 $0 $0 $0 $3,660,602 $1,047,605 $0 $0 $10,000 $1,585 $12,967 $0 $0 $0 $813,318 $0 $55,988 $0 $0
$531,073 $1,162,633 $6,881 $3,730,640 $1,053,086 $223,438
$0 $309,072 $0 $0 $0 $144,623 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,220,194 $1,055,865 $0 $530,873 $217,759 $2,583 $0 $0 $0 $0 $485,664 $0 $0 $0 $0 $0 $205,382 $0 $0 $0 $0 $0 $0 $0 $990,950 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $185,000 $0 $0
$530,873 $1,217,877 $2,583 $3,396,144 $1,055,865 $144,623
$201 ($55,244) $4,298 $334,496 ($2,779) $78,815
$~ $6,024,031 $1,079,157 $886,671 $614,128 $2,162,678
C:\Users~altshul\AppData\Local\Mlcrosoft\W!ndows\Temporary Internet Flles\ContentOutlook\5W3COU1Y\2017-12 AU Funds Summary.xlsx Page 1of1
OPERATING EVENTS TOWNSHIP MUNICIPAL BOND RESERVE FUND FUNDS AUTHORITY FUND
$2,490,604 $60,027 $18,057,119 $1,415,651 0
$0 $0 $9,089,293 $0 $0 $0 $0 $32,697 $0 $0 $0 $0 $44,375 $0 $0 $13,751 $31 $470,671 $10,361 $28,728 $0 $0 $954,447 $0 $0 $0 $0 $5,322,955 $9,128 $0 $0 $0 $1,566,700 $564 $0 $0 $0 $1,829,761 $185,000 $8,097,485
$13,751 $31 $19,310,900 $205,053 $8, 126,213
$0 $0 $1,868,305 $0 $0 $0 $0 $6,303,178 $0 $0 $0 $0 $6,000 $0 $0 $0 $0 $3,386,043 $1,422,384 $0 $0 $0 $2,868,862 $0 $0 $0 $0 $1,094,701 $0 $789,890 $0 $0 $209,666 $0 $0 $0 $0 $1,682,296 $55,988 $0 $0 $0 $902,086 $0 $0 $0 $60,058 $245,058 $0 $0
$0 $60,058 $18,566, 196 $1,478,372 $789,890
$13,751 ($60,027) $744,704 ($1,273,319) $7,336,323
$2,504,354 $.Q $1818021812 I $142,331 $7,336,323
1/9/2018
Memo East Goshen Township
Date: To:
From: Re:
January 11, 2018
Board of Supervisors Rick Smith, Township Manager Wyllpen Farms - Speed Humps
On January 11, 2018 the County of Chester closed Dutton Mill Road between East Strasburg Road and Manley Road in order to make repairs to their bridge over the Ridley Creek. The official detour is posted for East Strasburg Road, North Chester Road, and West Chester Pike. However, most of the local residents and commuters that use that section of Dutton Mill Road are aware that you can get around the bridge by cutting thru Wyllpen Farms and they do not follow the posted detour.
Several residents of Wyllpen Farms have expressed concerns about the additional traffic. I have asked the police the increase their presence in Wyllpen Farms especially during the morning and evening peak traffic periods. However, the police can only control the speed of the motorists, and they not able to be there all of the time.
I would suggest that the Board authorize the purchase and installation of six temporary speed humps in Wyllpen Farms. The speed humps are $100 each. While we will have to purchase some additional signs, they will be able to be used at the other locations at which we have permanent speed humps.
I would add that sometime this year Penn DOT will close Morstein Road in order to make repairs to the bridge that goes over Route 202. While the official Penn DOT detour will use state roads, motorists will quickly find out they can get around the bridge by cutting thru Charter Chase or using Hershey Mill Road. We would able to reuse the temporary humps on those streets when that bridge is closed.
The Township Code contains a provision that allows for the installation of traffic control
measures on a temporary basis.
Suggest Motion: I move that we purchase and pursuant to Section 225-4 of the Code of East Goshen authorize the installation of six temporary speed humps in Wyllpen Farms for the duration of the Dutton Mill Road bridge project.
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2018\Memo Wyllpen Speed Humps 011118.docx
/
/
'·
Memorandum
East Goshen Township '1580 Paoli Pike
West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: i/10/2018 To: Board of Supervisors J h From: Mark Gordon, Township Zoning Officer .A#' Re: East Goshen Elementary Land Development Application
Dear Board Members,
The WCASD has submitted a LD application for review and approval for the East Goshen Elementary School Property. The district proposes to renovate the entire school to including a new two story addition for additional classrooms, a complete fire suppression system and a single story addition on the rear of the school for a reading
resource lab.
This application has been reviewed by the Township Engineer, CCPC, and the Township Conservancy Board; resulting in minor comments.
The District is requesting nine separate waivers from the Land Development Ordinance and the Stormwater Management Ordinance which are all acceptable to the Township Engineer and Staff.
Items to be discussed:
The CCPC Recommends adding sidewalks to the N. Chester Road frontage of the property. The applicant can discuss their opinion on this recommendation however the Township has not identified this stretch of N. Chester Rd. for any enhanced bicycle or
pedestrian access. Additionally the School District policy prohibits students to walk to the East Goshen Elementary School. The East Goshen Elementary School property will have access to the future Paoli Pike Trail along Paoli Pike. This pedestrian access is a safer option rather than installing sidewalks along N. Chester Road.
The CCPC has also commented on the existence of wet soils n the property which the applicant has also identified as a limiting factor for the management of stormwater. The proposed project actually results in a net reduction of impervious coverage on the
property. This is why the Township engineer and staff have no issue with their request for waivers from two sections of the SWM ordinance.
F:\Data\Shared Data\Property Management\53-4\53-4-78 (East Goshen Elem.)\2018 LD\Memo to BOS 01052018.doc
'·.
Recommendation:
The Town ship engineer has reviewed the final plan and has no further concerns and believes the waivers requested are appropriate. Staff is confident that the conditions below can and will be addressed by the applicant and will insure that they are accomplished over the course of the project.
Draft Motion:
Mr. Chairman, I move that we approve the waiver requests and the Land Development Plan for the East Goshen Elementary School dated 4/28/2017 last revised 1/5/2018 with the following conditions: 1. In an effort to address the parking shortages for special events at the school, the Applicant shall begin conversations with the Township to use the Township
Building parking lot for overflow parking during special school events. 2. The Applicant shall petition Penn DOT to relocate and supplement the "School Zone" flashing lights on N. Chester Rd. and E. Boot Rd. to improve safety at the school entrances on North Chester Rd. 3. The Applicant shall follow all applicable Federal, State and Local laws and ordinances.
F:\Data\Shared Data\Property Management\53-4\53-4-78 (East Goshen Elem.)\2018 LD\Memo to BOS 01052018.doc
/
/
AREA CODE 610
692-7171
January 5, 2018
East Goshen Township Board of Supervisors 1580 Paoli Pike
W~st Chester, Pa. 19380
EAST GOSHEN TOWNSHIP PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380·6199
Re: WCASD Land Development for East Goshen Elementary School
Dear Board Members:
' ..
At their meeting on January 3, 2018 the Planning Commission voted unanimously in favor of the following motion:
Mr. Chairman, I move that the Planning Commission support the waiver requests and recommend approval of the Land Development Plan for the East Gosh·en Elementary School dated 4/28/2017 last revised 11/28/2017 with the following conditions:
1. The Applicant shall address all comments in the Township Engineers' review letter dated December 19th, 2017 and submit revised plans to the Township. 2. The Applicant shall follow all applicable Federal, State and Local Jaws and ordinances.
I
3. In an effort to address the parking cohcerns for special events at the school, the Applicant shall begin conversations with the Township to use the Township · Building parking Jot for overflow parking during special school events. 4. The Applicant shall petition Penn DOT to relocate and supplement the "School Zone" flashing lights on N. Chester Rd. and E. Boot Rd. to improve safety at the school entrances.on North Chester Rd.
Sincei
Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Property·Management\53-4\534-78 (East Goshen Elem.)\2018 LD\PC Rec to ~OS 01052018.doc
,_
,_
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PA
SUBDIVISION AND I OR LAND DEVELOPMENT APPLICATION
Date Filed:
Application for (Circle one):
Osubdivision @Land DevelopmentOSubdivision & Land Development
A. Application is hereby made by the undersigned for approval of a Subdivision and or Land
Development Plan, more particularly described below.
1 A I. t' West Chester Area School District c/o Kevin Campbell . pp 1can s name: ________________________ _
Address: 782 Springdale Drive, Exton, PA 19341 Phone: (484) 266-1260
F E .1 KCAMPBELL@wcasd.k12.pa.us ax: __________ ma1: ________________ _
2. Name and address of present owner (if other than 1. above)
Fax:---------- Email: ________________ _
3 L t. f 1 800 N. Chester Road, West Chester, PA 19830 . oca ion o pan:---------------------
4 P d f I Proposed Building Addition (East Goshen Elementary School) . repose name o pan:------------------
534_78 OE R-2; Low Density 5. County Tax Parcel No.: · Zoning District: Residential District
18.085 Acres 1 6. Area of proposed plan (ac.): Number of lots: _____ _
7 A f ( ) Maintained as existing . rea o open space ac. : ----------------------
Building Addition 8. Type of structures to be constructed:------------------
9. What provisions are to be made for water supply and sanitary sewer? Only building
additions are proposed and will be serviced by existing sanitary sewer and water.
10. Linear feet of road to be constructed: _N_IA _____ _
11 N f E . Bohler Engineering PA, LLC c/o George J. Hartman Ill, P.E. . ame o ngmeer: ------------------------
Ph N b (215) 996-9100 F (215) 996-9102 one um er: ax:---------
E .1 dd ghartman@bohfereng.com ma1 a ress: ____________________ _
f;\data\shared data\code dept\application & forms\current forms and applications\subdivision and land dev application.doc
/
'·
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LA.NO DEVELOPMENT APPLICATION
/---...._...-"V{!.
12 N f
.,.~:::~d Pl Bohler Engineering PA. LLC c/o George J. Hartman Ill, P.E. . ame o .1-an anner: ______ ~-----------
Phone Number: (215) 996-9100 Fax: (215) 996-9102
E .1 dd ghartman@bohlereng.com ma1 a ress: _~--------------------
B. I/We agree to reimburse the Township of East Goshen for such fees and expenses the
Township may incur for the services of an Engineer{s) in investigations, tests, and review in
relation to the Subdivision Plan. c. I/We agree to post financial security for the Improvements depicted on the Subdivision and or
land Development Plan pursuant to the Subdivision and Land Development Ordinance. D. I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost
to Township.
NOTICE
The Township requires an Occupancy Permit before any building can be occupied; no Occupancy
Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.
Administrative Use
..... ~ Fees reqeived from applicant$ .S.5 O -- basic fee, plus $_~<- ___ per lot
t!Je;;, . For lots = $ '55"0 ~- .
Application and plan received by: ~-~
(Signature}
Application accepted as complete on: l\ \i.1 l z..:>q {Date}
Date: i\ {tci r ft!1 l1
F:\Data\Shared Data\Code Depl\Appllcation & Fonns\Current Forms and AppJlcaUons\Subdivision and land Dev ApplfcaUon.doo 2
"
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
SUBDIVISION AND/OR LAND DEVELOPMENT CHECKLIST
This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the State of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application Process and the Review Process. The application process must be completed in its entirety prior to the advancement into the Review Process.
* Review the formal Planning Commission review procedure on page five.
Application for (Circle all appropriate): OSubdivisionmland Development
Applicant Information:
Name of Applicant: West Chester Area School District c/o Kevin Campbell
Address: 782 Springdale Drive, Exton, PA 19341
Telephone Number: <484) 266-126° Fax: ~---------- ~----------~
Email Address: KCAMPBELL@wcasd.k12.pa.us
Property Address: 800 N. Chester Road, West Chester, PA 19830
Property Information:
owner's Name: West Chester Area School District
Address: 800 N. Chester Road, West Chester, PA 19830
,
T P I N b 53 4 78 OE z . D' t . Density ax arce um er:_-_-_· _____ ornng 1s net: Residential
District Description of proposed subdivision and or land Development:
Acreage: 18·085
The West Chester Area School District proposes to demolish a portion of the existing East Goshen
Elementary School and replace it with a 1-story, 2,240 sq addition in an alternate location. An additional
1-story portion of the existing building is proposed to be demolished and replaced with a 2-story, 21 ,248 sf
(Gross) addition in place.
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 3
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
Application Process Checklist (Administrative use only):
Date 9omplete
1. Completed Township Application Form: ... ...... ...... ... ... ... ... 1 t ~2;':; -q 2. Township application and review fees paid: .................... .. l\ 3. County Act 247 Form complete: ... ... ... ...... ...... ...... ...... .... q 4. Appropriate County Fees included: ................................. __ 1 _1 _ 5. 11 Copies of sealed Sub I LD plans: ................................ __ 11_ 6. 11 copies of other required plans: a. Landscape: (sealed).............................................. t1 b. Conservancy: (sealed) ....................................... . c. Stormwater Management: (sealed) ....................... . { \
7. Three copies of the stormwater report and calculations: ...... __ 1_1 _ 8. Copies of supplementary studies; if required: a. Traffic Impact Study:........................................... t-l 0T \..; Lc..v111\.i) b. Water Study: ...................................................... ~vT 11.ictv t:>i'i...\)
Application accepted on l\ {z't jz~ 1 ·1 by ~ A 1 l:i"'"~cr-J
Official Signature /VVl ~ Title
Review Process Checklist {Administrative use only)
Date Complete
1. Date of first formal Planning Commission Meeting following . I t b . . f 1· t' (D 1) It t, i1 comp e e su m1ss1on o app 1ca ion, ay :... ... ... ... ... ... ... - · ~ Date Abutting property letter sent: ... ... ... ... ... ... ... ... ... .. . ... 11- ~~""ll 2. Date presented to Planning Commission: ......................... ;2-l"z,.,q 3. Date submitted to CCPC: .............................................. a-3,:;.z.,.; 4. Date submitted to Township Engineer: . ........ ... .... .... ... .... lff- ~11- Zut7 5. Date by which the PC must act, (Day 70): ......................... zy1;.J- io1f. 6. Date by which Board of Supervisors must act, (Day 90): ...... S-t,,,. i""'1 g 7. Date sent to CB: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . u:... ~o --11 8. Date sent To MA:......................................................... 1l 9. Date sent to HC: .. . . .. .. . .. . . .. . .. . . . . . . .. . . . . . .. . .. .. . . .. .. . .. . . .. .. . .. . . l'Jt\- 10. Date sent to PRB: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . u- ~~-11 11. Date sent to TAB: .. . .. . . .. . .. . .. .. . .. . . . . . .. . .. .. . . .. .. . . .. . .. . .. .. . .. . .. •1
F:\Data\Shared Data\Code Dept\Applicalion & Forrns\Current Forms and Applicalions\Subdivision and Land Dev Application.doc 4
/
EGOST00125
Mark Miller Director of Public Works East Goshen Township 1580 Paoli Pike West Chester, PA 19380
January 10, 2018
RE: !East Goshen Elementary School Expansion School Speed Limit Flasher Upgrades
Dear Mark:
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennoni.com
As requested, we have reviewed the existing 15-mph School Speed Limit Flasher (Permit S-1413}. We offer the following recommendations:
1. Current school flashers along N. Chester Road (SR 0352) are pedestal mounted. These should be replaced with overhead mast arm mounted school flashers. In addition, "YOUR SPEED RADAR SPEED DISPLAY" indicators should be provided;
2. The northbound N. Chester Road (SR 0352) flasher should be relocated approximately 150 feet south of the intersection of N. Chester Road (SR 0352) and Boot Road;
3. A pedestal mounted school flasher should be added along Boot Road approximately 200 feet east of the intersection of N. Chester Road {SR 0352) and Boot Road;
4. Due to proximity of historic structures, mast arms and pedestals should be powder coated black; and
5. All "END SCHOOL ZONE" signs should be replaced with new signs located across from each flasher support.
A revised flasher permit plan incorporating the above comments should be submitted to the Township for review prior to submission to PennDOT. Note, PennDOT may require an updated TE-160 application and accompanying resolution.
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
PENNON!
~j./. (/tl-L/" (f f -.
~ Nathan M. Cline, PE Township Engineer
cc: Rick Smith, Township Manager {vi.a e-mail)
U:\Accounts\EGOST\EGOST00125 - East Goshen Elem School Expansion\DOC PREP\EG Elementary Flasher LTR 2018-01-10.docx
/
EGOST00125
Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
January 11, 2018
RE: East Goshen Elementary School Expansion Preliminary/Final Land Development - znd Submission
Dear Mark:
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennoni.com
As requested, we have reviewed the following information, prepared by Bohler Engineering, regarding the
referenced submission:
e "Proposed Building AddWon (East Goshen Elementary School)" (seven sheets) dated April 28, 2017, last revised January 05, 2018;
e "General Project Description and Preliminary Stormwater Management Calculations" dated November 28, 2017;
e Subdivision and Land Development application; and
0 Response letter dated January 9, 2018.
The owner/applicant, West Chester Area School District c/o Kevin Campbell, proposes to demolish a 1-story
portion of the existing school and replace it with a 2-story addition (21,792 SF). Further, they propose to demolish a 2,863 SF portion of the existing school and replace it with a 1-story, 2,221 SF addition in an alternate location. The parcel (UPI No. 53-4-78) is located on the west side of North Chester Road (SR 352) approximately 700 feet south of its intersection with Paoli Pike, within the R-2 Low Density Residential District. The school is currently served by public water and sanitary sewer.
The applicant has requested the following nine (9) waivers:
1. From §195-20.C- requiring infiltration for a redevelopment; 2. From §195-22.A- requiring peak runoff rates for redevelopment to be reduced in the post- development to the pre-development peak rates for the same storm event; 3. From §205-28 - requiring a separate preliminary and final plan submission; 4. From §205-30.8(5) - requiring preliminary plans to show the names of all abutting property owners; 5. From §205-30.8(10)- requiring preliminary plans to show all existing features within 50 feet of the property line; 6. From §205-31- requiring a separate preliminary and final plan submission; 7. From §205-33.8(5)- requiring a final plan to show the names of all abutting property owners; 8. From §205-33.B(lO)- requiring a final plan to show all existing features within 50 feet of the property line; and 9. From §240-38.10 - requiring a Historic Resource Impact Study.
U:\Accounts\EGOST\EGOST00125 - East Goshen Elem School Expansion\DOC PREP\EG Elementary Rev LTR 2018-01-10.docx --Ii&-
EGOST00125 Mark A. Gordon, Zoning Officer
January 11, 2018 Page 2 East Goshen Elementary School Expansion
We have discussed the proposed work and our previous comments with the applicant's engineer and Township staff and all comments from our December 19, 2017 review letter have been adequately addressed.
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
PENNON I
dll----~
~-.( l .~/ r . "'~··
Nathan M. Cline, PE Township Engineer
cc: George Hartmann, PE, Bohler Engineers (via e-mail) Kevin Campbell, West Chester Area School District (via e-mail) Rick Smith, Township Manager (via e-mail) Mark Miller, Public Works Director (via e-mail)
/
'·
.. -·--· - . -- p-----··-· ---··--- ----~---·------- ·-------·- ··- --------~-
TM BOHLER
ENGINEERING
East Goshen.Township
1580 Paoli Pike West Chester, PA 19380
Attention: Mark Gordon
Dear Mark:
Re:
January 9, 2018 Via Courier
Proposed Building Addition
1600 Mamor lr»~nve, 5lUlite 2@0 Clilammt, ~A :il.69:ll.4 PHONE 215.996.9100
FAX 215.996.9102
East Goshen Elementary SchlL:· <lii;;;;;Y~=====::J 800 N. Chester Road East Goshen Township
Chester County, PA PC161321
Regarding the above referenced project, enclosed please find the following:
e Eight (8) copies of the Proposed Building Addition (East Goshen Elementary School) Plans, dated 4/28/17, Revision 2, dated 1/5/18, sheets 1-7 of7.
e Eight (8) copies of the Proposed Floor Plan with Faculty Count, dated 1/3/18, prepared by Blackney Hayes Architects.
The enclosed items have been revised in accordance with the following consultant's review letters: Pennoni's review letter, dated 12/19/17; and The County of Chester's review letter dated 12/15/17.
Pennoni's review letter, dated 12/19/17:
I. The applicant has indicated that the project will result in a net decrease in impervious area on the site. The practical application of this reduction results in a decrease in the volume and rate of stormwater leaving
the site. The applicant has also provided infiltration testing results that demonstrate unfavorable subsurface conditions. As an alternative to subsurface infiltration, the applicant proposes soil amendments
in accordance with the Pennsylvania Department of Environmental Protection's Best Management Practices Manual. It is our opinion that for this project, the combination of impervious area reduction and amended soils will meet the intent of the Stormwater Management Ordinance and preserve the integrity of the downstream waterwcys.
No plan revisions required.
2. Per §195-39, the Township requests a note be added to the plans stating the following:
''A blanket stormwater management easement is provided over and across the property in favor of East Goshen Township to allow the Township and its agent and designees access to the proposed stormwater management facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that mcy be necessary to enforce the requirements of the Township's Stormwater Management Ordinance or of any applicable O&M plan or O&M agreement."
Per conversations with the Township Engineer, a stormwater management easement is not required for this project as the only best management practice that is proposed is soil amendments which will not require maintenance after installation.
• ;.-·-,--u- ·---
/ Mark Gordon 800 N. Chester Road PC161321 January 9, 2018
Page2of3
3. The appzicant is reminded that an-Ci&M Agreement must be executed with the Township. (§195-27.F(2))
Per conversations with the Township Engineer, a storm.water management O&M Agreement is not required for this project as the only best management practice that is proposed is soil amendments which will not require maintenance after installation.
The County of Chester's review letter, dated 12/15/17:
LANDSCAPES:
1. The project site is located within the Suburban and Natural Landscape designations ofLandscapes2, the 2009 County Comprehensive Plan. The proposed land development is consistent with the objectives of the Suburban Landscape.
No plan revisions required.
WATERSHEDS:
2. Watersheds, the water resources component of Landscapes2, indicates the proposed development is located within the Ridley Creek watershed Watersheds' highest priority land use objectives within this watershed are: reduce stormwater runoff, protect vegetated riparian corridors, and protect/ enhance water-based recreation, cultural, historic resources and public access. Watersheds can be accessed at www.chesco.org/water.
Impervious cover is being reduced as part of this development and soil amendments are proposed to provide volume attenuation for stormwater. No increase in runoff from the site is anticipated.
PRIMA.RY ISSUES:
3. We recommend that the applicant extend the existing sidewalk network to the adjoining parcels along Chester Road In addition to sidewalks being an essential design element in the Suburban Landscape, Landscapes2 recommends that a safe network of bicycle and pedestrian links be provided within and between residential
employmen~ commercial educational, public, and recreational land uses (Transportation Policy T2. l}. Furthermore, the project site is located within the Town Center designation of the Future Land Use Plan map
in the Township's 2015 Comprehensive Plan; one of the key elements of the Township's Future Land Use Plan is to transform the Town Center into a viable, walkable, visitable place.
Per discussion at the East Goshen Township Planning Commission meeting on 1/3/18, it was discussed that no sidewalks would be provided as part of this project since the school district does not allow students to walk to this school Additionally it was discussed that the Township would not require sidewalk to be provided for consistency with the township master plan.
4. The site plan depicts an existing40footwide right-of way on Chester Road (Route 352). The County Planning Commission's Multi-Modal Circulation Handbook (2016 Update), which is available online at www.chescoplanning.org/resources!PubsTransportation.cfm, classifies Route 352 as a minor arterial road. The Handbook (page 183) recommends a 100 foot-wide right-ofeay for minor arterial roads in suburban areas to accommodate future road and irifi-astructure improvements. We recommend that the applicant and the contact PennDOT to determine the appropriate right-of way to be reserved for this section of Route 352. We suggest that this area be identified as a dedicated right-of way, and be offered for dedication to the appropriate agency.
Per discussion at the East Goshen Township Planning Commission meeting on 1/3/18, it was discussed that no additional right-of-way should be offered for dedication at this time. It was discussed, however, that should PennDOT require additional right-of-way in the future for any improvements to Chester Road that the school district may be required to dedicate additional right-of-way at such time.
-.~-. -<;r---- -------·- _..:.......:......:..:: ~___;:___. ~-__:" __ ._. -·-- ··- - - ___ _....:_: __
'-..
5.
Mark Gordon 800 N. Chester Road PC161321 January 9, 2018
Page3 of3
ihe site contairls -areas-OJ}rydric (wet} soils (GdB Gladstone and Ha Hatborofwhich .have .limitations io-- -- --·- --- - development. These limitations include drainage problems due to low permeability, low runoff rates and sub- surface saturation. When construction takes place on these soils, it interferes with the natural drainage of the land. On-site alterations to existing drainage patterns should be carefully inspected by the Township Engineer to insure that off-site drainage conditions are not negatively affected.
No alterations to existing drainage patterns are proposed as part of this project.
ADMINISTRATIVE ISSUES:
6. The applicant is requesting two waivers from Chapter 195-Stormwater Management of the Township Code, six waivers form the provisions of the Township Subdivision and Land Development Ordinance, and a waiver from the historic resource impact study requirements in Section 240-38. l 0 of the Township Zoning Ordinance (we acknowledge that Section 240-38.10 states that the impact study requirements can be waived by the Board of Supervisors in the situations specified in this section of the Code). Waiver requests should only be granted following the determination that the proposed project either meets the purpose of these requirements or does
not create the impacts that these provisions are intended to manage. Additionally, the Township should ensure that proposed stormwater waiver requests can technically be granted under the requirements of the Stormwater Management Ordinance.
Per the Township Engineer's review letter, the proposed stormwater management approach for this development meets the intent of the Township's Stormwater Management Ordinance.
7. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for
endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment
Office.
Four ( 4) copies of the final plan will be provided to the Chester County Planning Commission prior to recording.
Should you have any questions or require additional information, please contact our office.
CC/af encs. cc:
Sincerely,
BOHLEF. ENGINEERING PA, LLC Ad~~ Project Manager
Nate Cline - Penn.om (via Newforma) Kevin Campbell- West Chester Area School District (via Newforma) Mark Groves- West Chester Area School District (via Newforma) Darin Jellison - Blackney Hayes .Architects (via Newfonna) Tim O'Kane - Blackney Hayes Architects (via Newfonna) Bob McCullen - Snyder Ho:f:finan Associates Inc. (via Newfonna) Fred Reese- Snyder Ho:f:finan Associates Inc. (via Newfonna)
R:\16\PC161321\Correspondence\Township\2018-0l-09 (Township Resubmission).doc
JOHN MILNER ARCHITECTS
DESiGl"-l tQ_ PRE~ERVATT0['-.1
December 12, 2017
Mr. Mark A Groves Facilities & Operations West Chester Area School District
1181 McDermott Drive West Chester, PA 19380
Re: East Goshen Elementary School
Dear Mr. Groves:
·: ., r;J:.WED ,
It was my pleasure to meet with you and Mr. Burns at the school site and to review the plans for renovations to the building and immediate site. Based on the Township Zoning Ordinance1 I understand that consideration must be given 1D the impact such reno.vations may have on any designated historic resources within a 250-foot radius of the schoofs property line. It is further understood that there are five (5) historic resources within this radius. Four (4) ~)f these are Class I Resources that comprise the Goshenville Historic District at 724, 734t 810 and 814 North Chester Road. 1he other one is a Class II Historic Resource at 73 2 North Ch.ester Road, but which is non.- contributing to this Historic District;. .
Given th.at East Goshen Elementary has beim an active (and evolving) entity since the 1960s, the context of the Historic District and adjacent non-contributing resource· has already been compromised ":in. this regard. The buildings themselves, however1 have not been impacted by the construction of the school.
It is my opinion, therefore1 in reviewing your currently proposed plans (dated November '7, 2017} for the additions and renovations, that there would be no negative impact on the surrounding historic buildings. Should the Township Planning Commission require a landscape buffer be
installed along the southern property, I would eertainly be in agreement. Please contact me if you
requi~e further input on my-part. ·
Sincerely yours, ~·JI:~
Mary w{tr DeNadai~···~AIA · Primpal·
,_
. -~ ....
December 19, 2017
EGOST00125
Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
RE: East Goshen Elementary School E1cpansion Preliminary/Final Land Development
Dear Mark:
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F; 610-429-8918
www.pennoni.com
As requested, we have reviewed the following information, prepared by Bohler Engineering, regarding the referenced submission:
G "Proposed Building Addition (East Goshen Elementary School)" (six sheets) dated April 28, 2017, last revised November 28, 2017;
@ "General Project Description and Preliminary Stormwater Management Calculations" dated November 28, 2017; and
e Subdivision and Land Development application.
The owner/applicant, West Chester Area School District c/o Kevin Campbell, proposes to demolish a 1-story portion of the existing school and replace it with a 2-story addition (21,248 SF). Further, they propose to demolish a 2,863 SF portion of the existing school and replace it with a 1-story, 2,240 SF addition in an alternate location. The parcel (UPI No. 53-4-78) is located on the west side of North Chester Road (SR 352) approximately 700 feet south of its intersection with Paoli Pike, within the R-2 Low Density Residential District. The school is currently served by public water and sanitary sewer.
The applicant has requested ~he following nine (9) waivers:
1. From §195-20.C- requiring infiltration for a redevelopment; 2. From §195-22.A - requiring peak runoff rates for redevelopment to be reduced in the post- development to the pre-development peak rates for the same storm event; 3. From §205-28 - requiring a separate preliminary and final plan submission; 4. From §205-30.B(5) - requiring preliminary plans to show the names of all abutting property owners; 5. From §205-30.B(lO) - requiring preliminary plans to show all existing features within 50 feet of the property line; 6. From §205-31- requiring a separate preliminary and final plan submission; 7. From §205-33.8(5)- requiring a final plan to show the names of all abutting property owners; 8. From §205-33.B(lO) - requiring a final plan to show all existing features within 50 feet of the property line; and 9. From §240-38.10 - requiring a Historic Resource Impact Study.
/
/
7~ EGOST 00125 Mark A. Gordon, Zoning Officer
We offer the following comments:
December 19, 2017 Page2 East Goshen Elementary School Expansion
1. The applicant has indicated that the project wfll result in a net decrease in impervious area on the site. The practical application of this reduction results in a decrease in the volume and rate of stormwater leaving the site. The applicant has also provided infiltration testing results that demonstrate unfavorable subsurface conditions. As an alternative to subsurface infiltration,, the applicant proposes soil amendments in accordance with the Pennsylvania Department of Environmental Protection's Best Management Practices Manual. It is our opinion that for this project, the combination of impervious area reduction and amended soils will meet the intent of the Stormwater Management Ordinance and preserve the integrity of the downstream waterways.
2. Per §195-39, the Township requests a note be added to the plans stating the following:
''A blanket stormwater management easement is provided over and across the property in favor of East Goshen Township to allow the Township and its agent and designees access to the proposed storm water management facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requirements.of the Township's Stormwater Management Ordinance or of any applicable O&M plan or O&M agreement.''
3. The applicant is reminded that an O&M Agreement must be executed with the Township. (§195- 27.F(2))
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
Nathan M. Cline, PE Township Engineer
cc: George Hartmann, PE, Bohler Engineers (via e-mail) Kevin Campbell, West Chester Area School District (via e-mail) Rick Smith, Township Manager (via e-mail) Mark Miller, Public Works Director (via e-mail)
/
/
EAST GOSHEN
CONSERVANCY
Decemb~r 14, 2017
East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380
Re: WCASD /East Goshen Elementary Land Development'
Landscaping
Dear Commission Members:
"Madame Chairman, I move that we recommend approval of the landscape plan presented as part of the WCASD Land Development plans for the proposed renovations to East Goshen Elementary school. "
Sini
Mark A. Gordon Zoning Officer
/
'··
/ l
\
THE COUNTY OF
COMMISSIONERS Michelle Kichline Kathi Cozzone Terence Panell
Brian N. O'Leary, AICP Executive Director
Louis F. Smith, Jr., Manager East Goshen Township
1580 Paoli Pike West Chester, PA 19380
PLANNING CoMMISSION
Govemment Services: Center, Suite 270 601 Westtown Raad P. 0. B-0x2747 West Chestel', PA 193.80-0990
(610) 344-6285 Fax (610) 344-6515
December 15, 2017
Re: Preliminary/Final Land Development - Proposed Building Addition (East Goshen Elementary School) # LD-12-17-15205 - East Goshen Township
Dear Mr. Smith:
A Preliminary/Final Land Development Plan entitled "Proposed Building Addition (East Goshen Elementary School)", prepared by Bohler Engineering, and dated April 28, 2017, and last revised on November 28, 2017, was received by this office on November 30, 2017. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.
PROJECT SUMMARY:
Location:
Site Acreage: Lots/Units: Non-Res. Square Footage: Proposed Land Use: Municipal Land Use Plan Designation: UPI#:
PROPOSAL:
the west side of North Chester Road (Route 352), south of Paoli Pike
18.08 1 lot 25,013 Additions to Existing School Building Town Center 53-4-78-E
The applicant proposes the construction of two additions totaling 25,013 square feet to the existing elementary school building. The project site, which is served by public water and public sewer, is located in the R-2 Low Density Suburban Residential zoning district.
RECOMMENDATION: The County Planning Commission recommends that the issues raised in this letter should be addressed and all East Goshen Township issues should be resolved before action is taken on this land development plan.
'
,.·
Page: · 2 Re: Preliminary/Final Land Development - Proposed Building Addition (East Goshen Elementary School) # LD-12-17-15205 -East Goshen Township
COUNTY POLICY:
LANDSCAPES:
1. The project site is located within the Suburban and Natural Landscape designatioils of Landscapes2, the 2009 County Comprehensive Plan. The proposed ·land development is consistent with the objectives of the Suburban Landscape.
Parcel lnro: Par<:e~s): 53-4-78-E
(Main)Address: SOD N Chesl2r Rd. Municip'li1y: i;astGoshen Twp.
lmagolnfo: Da1aTaken:2014
Source: CCPC, 2017
c::JParcel
!-~-l Olher Parcels
N
'Olis m:;1p is fiBll of emrsbuldor:s nolguarantee fie map or lls faa1uru tD be'lplllflllyor lmipotmly atturate. +
Ho1e:ThtCCPOmllilt1•V•JY•lroftto1nnrr1
WATERSHEDS:
2. Waterslteds, the water resources component of Landscapes2, indicates the proposed development is located within the Ridley Creek watershed. Waterslteds' highest priority land use objectives within this watershed are: reduce stormwater runoff, protect vegetated riparian corridors, and protect/enhance water-based· recreation, cultural, historic resources and public access.
Waterslteds can.be accessed at www.chesco.org/water.
PRIMARY ISSUES:
3. We recommend that the applicant extend the existing sidewalk network to the adjoining parcels along Chester Road. In addition to sidewalks being an essential design element in the Suburban Landscape, Landscapes2 recommends that a safe network of bicycle and pedestrian links be provided within and between residential, employment, commercial, educational, public, and recreational land uses (Transportation Policy T2.1 ). Furthermore, the project site is located within
•• -r • "
\
Page: Re:
#
3 Preliminary/Final Land Development - Proposed Building Addition (East Goshen Elementary
School) LD-12..: 17-15205 - East Goshen Township
the Town Center designation of the Future Land Use Plan map in the Township's 2015 Comprehensive Plan; one of the key elements of the Township's Future Land Use Plan is to transform the ToWn Center into a viable, walkable, visitable place.
l!l:l~t'ilJ I UL.'i!J -··-· .. -~-
-=--=.::=:-~ ................... ,,.,,..'"°"""
4
.. :
-~·'-'""""'~ -~· ,_ . .., ... ~ ==~:: :;;:::::;---1
Plan Detail Sheet 1 - Proposed.Building Addition (East Goshen Elementary School)
4. The site plan depicts an existing 40 foot wide right-of-way on Chester Road (Route 352). The County Planning Commission's Multi-Modal Circulation Handbook (2016 Update), which is available online at www.chescoplanning.org/resources/PubsTranspoitation.cfin, classifies Route 352 as a minor arterial road. The Handbook (page 183) recommends a 100 foot-wide right-of- way for minor arterial roads in suburban are~s to accommodate future road and infrastructure improvements. We recommend that the applicant and the contact PennDOT to determine. the appropriate right-of-way to be reserved for this section of Route 352. We suggest that this area be identified as a dedicated right-of-way, and be offered for dedication to the appropriate agency.
/
Page: 4 Re: Preliminary/Final Land Development - Proposed Building Addition (East Goshen Elementary
School) # LD-12-17-15205 -East Goshen Township
5. The site contains areas of hydric (wet) soils (GdB Gladstone and Ha Hatboro) which have limitations to development. These limitations include drainage problems due to low permeability, low runoff rates and sub-surface saturation. When construction takes place on these soils, it interferes with. the natural drainage of the land. On-site alterations to existing drainage patterns should be carefully inspected by the Township Engineer to insure that off-site drainage conditions are not negatively affected.
ADMINIS1RATIVE ISSUES:
6. The applicant is requesting two waivers from Chapter 195-Stormwater Management of the Township Code, six waivers form the provisions of the Township Subdivision and Land Development Ordinance, and a waiver from the historic resource impact study requirements in Section 240-38.10 of the Township Zoning Ordinance (we acknowledge that Section 240-38.10 states that the impact study requirements can be waived by the Board of Supervisors in the
7.
· situations specified in this section of the Code). Waiver requests should only be granted following the determination that ·the proposed project either meets the purpose of these requirements or does not create the impacts that these provisions are intended to manage. Additionally, the Township. should ensure that proposed stormwater waiver requests can technically be granted under the requirements of the Storm water Management Ordinance.
A minimum of four ( 4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.
This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail.
cc: West Chester Area School District Bohler Engineering
Sincerely,
Paul Farkas
Senior Review Planner
Matthew Miele, District Permits Manager, PennDOT Francis J. Hanney, P.E., PennDOT Chester County Conservation District
DN
UP
UP
CORRIDOR
C008
UP UP UP
PRINCIPAL
1 FACULTY
ELL
1 TEACHER
RECEPTION
2 ADMIN STAFF LIBRARY
1 LIBRARIAN LIBRARY
OFFICE
COURTYARD
HEALTH
SUITE
1 NURSE
PSYCHOLOGIST
1 FACULTY
GIFTED
1 TEACHER CASE WKR.
1 FACULTY
SPEECH
1 TEACHER
CONF.
ROOM
GUIDANCE
1 FACULTY
INSTRUCTIONAL COACH
1 FACULTY
I.T.
1 TECH
AV STOR.
STOR.
CLASSROOM
(KINDERGARTEN)
1 TEACHER
CLASSROOM
(KINDERGARTEN)
1 TEACHER
CLASSROOM
(KINDERGARTEN)
1 TEACHER
CLASSROOM
(KINDERGARTEN)
1 TEACHER AUTISTIC SUPPORT
1 TEACHER 8 AIDES
OT/PT
1 TEACHER 1 AIDE
GYMNASIUM
1 TEACHER
GYM
OFFICE
MECHANICAL
ROOM
INSTRUMENTAL
MUSIC
1 TEACHER
MUSIC ROOM
1 TEACHER
ART ROOM
1 TEACHER
KILN
STOR
RESOURCE
(K-1)
1 TEACHER
READING LAB
3 TEACHERS
READING
READING
READING
CLASSROOM
(1ST GRADE)
1 TEACHER
CLASSROOM
(1ST GRADE)
1 TEACHER
CLASSROOM
(1ST GRADE)
1 TEACHER
CLASSROOM
(1ST GRADE)
1 TEACHER
CLASSROOM
(2ND GRADE)
1 TEACHER
CLASSROOM
(2ND GRADE)
1 TEACHER
CLASSROOM
(2ND GRADE)
1 TEACHER
CLASSROOM
(2ND GRADE)
1 TEACHER
CLASSROOM
(3RD GRADE)
1 TEACHER
RESOURCE
(2-3)
1 TEACHER
IDF
STOR.
STOR.
STAGE
CAFETERIA
STOR.
TABLE/
CHAIR
STOR.
STOR.
KITCHEN
3 EMPLOYEES
STOR.
STOR.
CUSTODIAN
OFFICE
1 CUSTODIAN
FACULTY
WORKROOM
FACULTY
DINING
ELEC.
MDF
CLASSROOM
(3RD GRADE)
1 TEACHER
CLASSROOM
(3RD GRADE)
1 TEACHER
LEGEND
CLASSROOM
FACULTY/SUPPORT SPACE
SPECIAL EDUCATION
SPECIAL PULL-OUT CLASSROOM
AUTISTIC SUPPORT
1 TEACHER 8 AIDES
AUTISTIC SUPPORT
1 TEACHER 8 AIDES
(OFFICES)
U.V.
ROOF
CLASSROOM
(5TH GRADE)
1 TEACHER
CLASSROOM
(5TH GRADE)
1 TEACHER
CLASSROOM
(5TH GRADE)
1 TEACHER
CLASSROOM
(5TH GRADE)
1 TEACHER
CLASSROOM
(4TH GRADE)
1 TEACHER
CLASSROOM
(4TH GRADE)
1 TEACHER
CLASSROOM
(4TH GRADE)
1 TEACHER
CLASSROOM
(4TH GRADE)
1 TEACHER
STORAGE
RESOURCE (4-5)
1 TEACHER
prepared for:
© 2017 Blackney Hayes Architects
This drawing is not to be copied or transmitted in any form without the express written authorization of Blackney Hayes Architects.
All ideas and concepts depicted or suggested in this drawing are the property of Blackney Hayes Architects.
Renovations & Additions to East Goshen
Elementary School
WEST CHESTER AREA
SCHOOL DISTRICT
01/03/18
0' 8' 16' 32' 64'
N
PARTIAL SECOND FLOOR PLAN
OVERALL FIRST FLOOR PLAN
79 TOTAL FACULTY/STAFF MEMBERS
23
14
27
15
------------ LIST OF WAIVERS REQUESTED FROM EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
PLASTIC BORDER ----,
SIGJI\. 'PLAY SAFE~ ~
l
rf'BENCH
\_ C"4SS'
AREA \
{
SIGN "puy 54FE"
~· <.,·
£0.P.
- J{) SIGN
Ali'tA CONVfYED TO WEST CHESTD? SCHOOL D/Sm!CT {O.B. 3761, PG. 450}
"--GRASS-.._
ARDI '
't4ST COSHEA1
il£!J£NTAPY SCHOOL "
\_GRASS-..._
AREA '-
· WALi(
CONC. CURB
SJCN - ----j.
~FOR EAST GOSHEN
FACULTr' .t 5TIJOENTS ONLY"
PROP.FIRE HYDRANT
\_GRASS-..._
ARfA ""
TABL£
PRG'. FDC AND 'flRE DEPARTt.EIT CONNECTION" SIGN
CONC. STEPS WILAND/NC J: HANDRAIL
COLUMN (rYP.)
\_GRASS'-.
Ali't"A
PROP.9'x9' CONCRETE
T .M.P. S3-4-78.0E
N/F fAJ/fJS OF lffST CHlSIEl1 Mf)I
SCHOOi. /JISllllCT O./J.. 2.f95, PG 56.f ! ST{)fjY M<lSONli'Y BUILOING
"LAST GOSllLN EL£MENTlli'Y SCHOOL •
BlD. HT. = 28. 0 '±
I
1) A WAIVER FROM SECTION 195-20-C WHICH REQUIRES INFILTRATION FORA REDEVELOPMENT.
2) A WAIVER FROM SECTION 195-22-A WHICH REQUIRES PEAK RUNOFF RAlES FOR REDEVELOPMENT IN PROPERTIES NOT IN THE CHESTER CREEK WATERSHED TO BE REDUCED IN THE POST-DEVELOPMENT TO THE PRE-DEVELOPMENT PEAK RATE FOR THE SAME STORM EVENT.
3) A WAIVER FROM SECTION 205-28 WHICH REQUIRES A SEPARATE PRELIMINARY ANO FINAL Pl.AN SUBMISSION.
4) A WAIVER FROM SECTION 205-30-B.5 WHICH REQUIRES A PRELIMINARY PLAN TO SHOW THE NAMES OF All ABUTTING PROPERTY OWNERS.
5) A WAIVER FROM SECTION 205-30.B.10 WHICH REQUIRES A PRELIMINARY PLAN TO SHOW ALL EXISTING
F~TIJRES WITHIN 50 FEET OF THE PROPERTY LINE_
6) A WAIVER FROM SECTION 205-31 WHICH REQUIRES A SEPARATE PRELIMINARY AND FINAL PLAN SUBMISSION.
7) A WAIVER FROM SECTION 205-33.B.5 WHICH REQUIRES A FINAL PLAN TO SHOW THE NAMES OF ALL ABUTTING PROPERTY OWNERS_
8) A WAIVER FROM SECTION 205-33.B.10 WHICH REQUIRES A FINAL PLAN TO SHOW ALL EXISTING FEATURES WITHIN 50 FEET OF THE PROPERTY LINE.
9) A WAIVER FROM SECTION 240-38.10 REQUIRING A HISTORIC RESOURCE tJIPACT STUDY (HRIS) TO BE PREPARED BVA REGISTERED ARCHITECT.
ZONING CHART
ZONED: R-2: LOW DENSITY RESIDENTIAL DISTRICT
EXISTING USE: PUBLIC SCHOOL (PERMITTED BY CONDITIONAL USE)
MIN. LOT AREA
MIN. LOT WIDTH
AT BLDG. SETBACK
AT STREETLINE
MAX.BLDG.COVERAGE
REQUIRED
10AC
300
150'
25%
EXISTING
18.0BSAC .... ....
8.5% (67,021 S.F.)
PROPOSED
11!.085 AC
B5W
658'
8.4% (66,379 S.F.)
MAX. IMPERVIOUS COVERAGE 35% 23.6%(186,531 S.F.) 23.4% (184,210 S.F.)
MAX. BLDG. HEIGHT 3 STORIES/ 30' 28' ± (1 STORY) 29' :t (2 STORY)
MIN. FRONT YARD 66' 99.3' 99.3'
MIN. SIDE YARD 40' 26.7' (ENC) 26.7' (ENC)
MIN. REAR YARD 75' 204' 204'
(ENC)- EXISTING NON-CONFORMITY
PARKING REQUIREMENTS
TOTAL REQUIRED
TOTAL PROVIDED
= 1 SPACE PER FACULTY MEMBER AND OTHER FULL TIME EMPLOYEE
PLUS 1 PER EVERY 2 CLASSROOMS OR OFFICES = (79 FACULTY I EMPLOYEES)X 1 +4712 (CLASSROOMS OR OFFICES) =79+24 = 103 SPACES
= 103 SPACES (INCLUDING 3ADAACCESSIBLE SPACES) [TEMPORARY CONDITION] = 104 SPACES (INCLUDING 5ADAACCESSIBLE SPACES) (PERMANENT CONDITION]
TM.P 53-4-80.1
fAJ/fJS N/F lllORND4l£ llMS1l.l£NT GROIJP
0.8. 3991, PG. 69J
AXEL FOIJND
~
T .M.P 53-1-79.0
fAJ/fJS N/F GlllROIJ. E SIMIUETT
0.8. J827. PG. -124 ~ I STORY 4 YASONRY BUil.DiNG /////////
MF~
!ANDING '.r'f',
N47D25'00"E
DOOR (IYP.)
EDGE OF WOODS
"
"-ASPHALT
PAVEME#T \
200.00' v.J.JJ
\WOODCO-..._
AR~ "o...
""'- ASP/-MLT
PAVEMENT'
""- WOOD£0 ----._
AR£A -.......
DRAWING LEGEND
& D=D
®
@ -
()
T .M.P. 53-1-80.0
fAJ/fJS N/F lllPllill, ILC 0.8. !m4 PG. 616
PROPERTY LINE RIGHT-OF-WAY LINE
A.DJACENT PROPERTY LINE EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING PARKING SPACE COUNT
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
PROPOSED BUILDING ADDITION
PROPOSED LIGHT POLE
I / /
\_WOODED--._
ARtA '
~NCH
I (tYe)~ j--- PUZZLE TDY
ITfP) BF.PA. = 67,021± SF. (EXISTING)
I,,
GRASS--._
AREA '
LA YDOWN Nl£A TO BE PROVIDED
lMTHSTONE
(REFER TO
DETAIL)
ID SIGN '!/!!ST GOSHEN.
""--PLAY------.._
ARlA
10 SIGN] ~PLAY GROUND"
BASKET BALL
HOOP
\_ "'4SS I
A/?54 \
0
' 0
• Iii: PROPOSED I-STORY
BUILDING ADDITION
(2,221 S.F.)
DODGE~'o ~
~Bit>CHERS
LA YDOWN /ifEA. TO BE
PROVIDECWITHYAK MAT OR EQUIVALENT
B4SKET BALL HOOP
'-- ASPHALT ""\
PAVEMENT '
PROP. 5' X 1 O' CONCRETE PAD FOR
EUl:.RGENCY GENERATOR (REFER TO STRUCTURAL PLAN FOR DETAIL)
............................. ~ ................................................. . ...... ......................... -.............................................. , ....... ............................. -··········································· ::t: ::: :::::tt: :: :::~ I::t:t
00 oOC°OcO 00 00 O'i:PO o~
PRJP. TEMPORARY
ACCESS TO CONSTRUCTION
STAGING AREA
\_WOODED'._
Al?5'
00 ooo
n
\_GRASS'-.
ARI'>
OVERHANG
6' C.L.f.
CONC. Sit.PS WjU.NOiNG &: I IANDRA!l
PROP. TEMPORARY UTILITY POLE (REFER TO ELEC'IRICA.L
PLAN FORDE.TAILS)
T .M.P SJ-1-1!2.0
LANfJS N/F SCHAFFER PHOP£HTl£S UC aa. l96J. PG. 6Jl
RELOCATION
OF ADA PARKING
SIGNS
YELLOW, STRIPING \
\_GRASS-.._
AREA '
"'- GRAITT '-.._
AR£4 '-...
/AND CO/'MYED m
T.M.P. 53-4-82.2 (0.8. 3768, PG. 829}
'\_ CONC.
MAT
PROP. RAISED
GARDEN BED (1YP .)
PROP. CONG.AREA
(13!1 SF) PROPOSED 2-STORY BUILDING ADDITION
('J2, 792 SF TOT AL)
[0.P.
\_ GMSS ----..._
A.R&'i 0
SIGN "END SCHOOL
ZONEU
PROP. CONG. AREA (292 SF)
SIG/I
"STOP~ LIO ND ENTER"
AS?HALT PAVEWDI \
OOOR {7'11'.)
T .M.P 53-1-78.0E
N/F LANfJS OF lffST CHESTER Mfll
SCHOOl /JISlllJCT 0.8. 2.fS5, PG. 5H ! STORY /JASONRY BUILDING
T"AST GOSHEN £L£MENTARY SCHOOL u
BLO. HT = 28.0'±
0
B.F.P.A. = 61,021± Sf. (EXISTING)
BLOG. HT.=17.5'±
COLUMN
(TYP.)
OOOR ACCESS
-SIG/I
"sTUP" "All TRAFRC
\GI/ASS-.._
ARtA '
MUST TURN RIGHT"
\_ G"4SS '.
AR.EA \
S/GNl "/JRUNK DRIVE/?S
fJE'STROY Lll/ES~
30 15 7.5 0
1"=30'
~ \_GRASS'-. ) AREA
DOUBLE j DOOR {7'11'.}
'-- ASPllAl T ""\
PAVEMENT \
PROP. STRIPING
\_ASPHALT-.............
PAVFAIFNT
FOR ADA PARKING
P P. RESERVE PMKING AND VAil ACCESSIBLE
OVERHANG
rruow STRIPING SIGN '-- ASPHALT ----..... "BUSES PAVEAIENT -~~~~~-£~.y-'P't_-"OM~i~r"~~
PROP.LIGHT POLE OYPJ (RE.FER TO ELECTRlr.AL PLANS RR DETAILS, SPECFICA.TIJNS, CONDUITS, ETC.)
\_ CR4SS'
AID \
FZAC~ PO/[ ')I
\__GRASS-.._
Ah'tA '- ~ e IOS/GNJ !AST ()()SHEN ELEMENTARY SCHOOL "
\_GRASS,
ARD '
\_Gli4SS '-.
ARFA
\ GRASS '
AR.EA "-
S~NS
TEMPORARY STRIPING CONDITION
LIST OF DRAWINGS
DESCRIPTION
......................... SITE PLAN
2 ......................... EXISTING CONDITIONS & DEMOLITION PLAN
3 ......................... GRADING & l!TILITY PLAN
4 ......................... SOIL EROSION &SEDIMENT POLLUTION CONTROL PLAN 30 5 ......................... LANDSCAPE PLAN
6 ......................... PHASING PLAN
7 ......................... DETAILS
CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH Tl-E NOTES AND SPECIFICATIONS CONTAINED HEREIN.
CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE REQUIREMENTS.
1. THE FOLLOWING DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF TI--118 SITE PLAN:
• SURVEY
CONTROL POINT ASSOCIATES, INC . 1600 MANOR DRIVE SUITE 210 CHALFONT, PA 185114 ENTlnED: •BOUNDARY & PARTIAL TOPOGRAPHIC SURVEY" PREPARED FOR: EAST GOSHEN ELEMENTARY SCHOOL SHEETS: 1-4 FILE NO: 02-160513-00 DATED: 2017.12.15 LAST REVISED: 2017-01-27
• OWNERJAPPLICANT
WEST CHESTER AREA SCHOOL DISTRICT 782 SPRINGDALE DRIVE EXTON, PA 19341
• "ARCHITECTURAL PLANS" - PREPARED BY BLACKNEY HAYES ARCHITECTS, DATED 12116/16. LAST REVISED 12101/17.
• "REPORT OF GEOTECHNICAL INVESTIGATION' PREPARED BY WHITESTONE ASSOCIATES, DATED 12116/16.
PRIOR TO THE START OF CONSmUCTION, THE CONTRACTOR MUST VERIFY THAT HE/SHE HAS TI--IE LATEST EDITION OF THE DOCUMENTS REFERENCED ABOVE_ THIS IS CONTRACTOR'S RESPONSIBILITY.
2. ALL ACCESSIBLE ADA PARKING SPACES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACr (ADA) CODE (42 U.S.C. § 12101 et seq. AND 42 U.S.C. § 4151 et seq.) OR THE REQUIREMENTS OF THE JURISDICTION WHERE THE PROJECT IS TO BE CONSTRUCTED, AND ANY AND All AMENDMENTS TO BOTH WHICH ARE IN EFFECT WHEN TI--IESE
PLANS ARE COMPLETED.
3. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THA.T ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED_ NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED THE COMMENTS TO ALL PLANS AND OTHER DOGLNENTS REVIEWED AND APPROVED BY THE PERMITTING AUTHORITIES AND CONFIRMED THAT ALL NECESSARY OR REQUIRED PERMITS HAVE BEEN OBTAINED. CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES.
4. THE OWNER/CONTRACTOR. MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL CERTIFICATIONS REQUIRED FOR Tl-IE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
!S. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS,. SPECIFICATIONS AND CONDITIONS OF APPROVAL. AND All APPLICABLE REQUIREMENTS. RULES. REGULATIONS. STATUTORY REQUIREMENTS. CODES, LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT.
e. THE REPORT OF GEOTECHNICAL INVESTlGATION AND RECOMMENDATIONS SET FORTH HEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND, IN CASE OF CONFLICT, DISCREPANCY OR AMBIGUllY, THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS CONTAINED IN THE PLANS AND THE REPORT OF GEOTECHNICAL INVESTIGATION AND RECOMMENDATIONS SHALL TAKE PRECEDENCE UNLESS SPEC I Fl CALLY NOTED OTHERWISE ON THE PLANS_ THE CONTRACTOR MUST NOTIFVTl-E ENGINEER, IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE REPORT OF GEOTECHNICAL INVESTIGATION AND PLANS AND SPECIFICATIONS PRIOR TO PROCEEDING WITH ANY FURTHER WORK.
7. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING BY THE OWNER AND OTHERS PRIOR TO THE TIME OF PLAN PREPARATION. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND NOTIFY BOHLER ENGINEERING, IN WRITING, IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE
F~TIJRES.
e. ALL DIMENSIONS SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO TI--IE START OFCONSmUCTlON. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES EXIST PRIOR TO PROCEEDING IMTH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTl YON THESE PLANS PRIOR TO CONTRACTOR GIVING ENGINEER WRITIEN NOTIFICATION OF SAME AND ENGINEER, THEREAFTER, PROVIDING CONTRA.CTOR WITH WRITTEN AlJTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK.
"
•. 0 •, '
• ,,.
\
'
"'~.;; .. ........... -.. ''·
. .._.,,, ..
• ,.-!
SITE
. ... ~ ....
' i ' l • '
LOCATION MAP
1·=1,000' ... 0 1,000' CONTINUATION OF GENERAL NOTES
.. (
! \ '
\ '
' .,
' I
• •
9. CONTRACTOR MUST REFER TO THE ARCHITECTURAUBUILDING PLANS "OF RECORD" FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY LOCATIONS.
10. PRIOR TO THE START OF CONSTRUCTION, THE GONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFUL REVIEW OF THE LATEST CIVIL PLANS AND THE LATEST ARCHITECTURAL PLANS (INCLUDING, BUT NOT LIMITED TO, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLAN, WHERE APPLICABLE). CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND BOHLER ENGINEERING, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST.
11. DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER CONTRACTOR.
12. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS STRUCTURESAND PROPERTIES.
13. THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITI--IER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. CONTRACTOR IS RESFIQNSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT.
14. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BlJT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND SHALL BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, REDESIGN, RE-SURVEY, RE}PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS. AND ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANY SUCH NEW OR EXISllNG CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCErvENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH APPLICABLE CODES, LAWS RULES, REGULATIONS, STATUTORY REQUIREUENTSAND STATUTES. CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISllNG DAMAGE AND TO NOTIFY THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION.
15. ALL CONCRETE MUST BE AIR ENTRAINED AND HAVE THE MINIMl..tJI COMPRESSIVE STRENGTH OF4,000PSI AT 28 DAYS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR REPORT OF GEOTECHNICAL INVESTIGATION.
16. THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY OR FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED BOTH ON THESE PLANS, AND FOR ANY CONFLICTS/SCOPE REVISIONS WHICH RESULT FROM SAME. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE METHODS/MEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT OF CONSTRUCTlON.
17. THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN RETAINED TO PERFORM OR BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OLJTSIDE OF ENGINEER'S SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY JOB SITE SAFETY ISSUES, AT ANY TIME.
1B. ALL CONTRACTORS MUST CARRY THE SPECIFIED STATlITORYWORKER'S COMPENSATION INSURANCE, EMPLOYER'S LIABILITY INSURANCE AND LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). AL1 CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS A ND SUBCONSUL TAN TS AS ADDITIONAL NAMED INSUREDS AND TO PROVIDE CONTRACTUAL LIABILllY COVERAGE SUFFICIENT TO INSURE THIS HOLD HARMLESS AND INDEMNllY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNISH BOHLER ENGINEERING WITH CERTIFICATIONS OF INSURANCE AS EVIDENCE OFTl-E REQUIRED INSURANCE PRIOR TO COMMENCING WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR ONE YEAR AFTER TI--IE COMPLETION OF CONSmUCTION. IN ADDITION, AL1 CONTRACTORS IMLL, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER ENGINEERING AND ITS PAST. PRESENT AND FUTURE OWNERS. OFFICERS. DIRECTORS, PARlNERS. SHAREHOLDERS. MEt.eERS. PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS A ND SUBCONSUL TANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENAL TIES, EXPENSES, PUNITIVE DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING Ol.JTOF OR IN ANYWAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS, ALL CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PRO..ECT. CONTRACTOR MUST NOTIFY ENGINEER. IN WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE HEREUNDER.
1S. BOHLER ENGINEERING WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH Af3 SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND/OR METHODS AND/OR TECHNIQUES OR PROCEDURES, COORDINATION OF THE WORKIMTH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME HEREUNDER. BOHLER ENGINEERING'S SHOP DRAWING REVleNWILL BE CONDUCTED WITH REASONABLE PROMPTNESS WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW. REVIEW OF A SPECIFIC ITEM MUST NOT INDICATE THAT BOHLER ENGINEERING HAS REVIEWED Tl-IE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER ENGINEERING WILL NOT BE RESPONSIBLE FOR AW DEVIATIONS FROM Tl-IE CONSTRUCTION DOCUMENTS NOT PROMPTI. Y AND IMMEDIATELY BROUGHT TO ITS ATTENTION, IN WRITING, BY THE CONTRACTOR BOHLER ENGINEERING WILL NOT BE REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED.
20. NEITHER THE PROFESSIONAL ACTMTIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND REU\TED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSUL TANTS AT A CONSTRUCTION/PROJECT SITE, SHALL RELIEVE THE GENERAL CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE ANY HEAL TH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEAL TH OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. BOHLER ENGINEERING SHAU BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND MUST BE NAMED AN ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE FOR JOB SITE SAFETY.
21. IF THECONTRAGTORDEVIATES FROM THE PLANS AND SPECIFICATIONS, INQ.UDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER FOR SUCH DEVIATIONS, THE CONTRACTOR IS SOI.EL V RESPONSIBLE FOR THE PAYMENT OF All. COSTS INCURRED IN CORRECTING ANY WORK DONE WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENAL TIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, IN ACCORDANCE WITH Tl-ESE NOTES HEREIN, FORAND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, PENAL TIES AND THE LIKE RELATED TO SAME.
22. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR ALL WORK THAT AFFECTS PUBLIC TRAVEL EITHER IN THE R.O.W. OR ON SITE. THE COST FOR THIS ITEM MUST BE INQ.UDED IN THE CONTRACTOR'S PRICE.
23. ALL SIGNING AND PAVEMENT STRIPING MUST CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCALLY APPROVED SUPPLEMENT.
24. ENGINEER IS NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR AND/OR OWNER FAIL TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS.
25. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN AND, FURTHER ENGINEER 16 NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS TO MAINTAIN ANDJOR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS TI-IAT ENGINEER INCURS AS A RESULT OF SAID FAILURE.
26. ALL DIMENSIONS MUST BE TO FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, UNLESS NOTED OTHERWISE.
27. ALL CONSTRUCTION AND MATERIALS MUST COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, LAWS, ORDINANCES, RULES AND CODES, AND ALL APPLICABLE OSI-IA REQUIREMENTS.
28. CONTRACTOR AND OWNER MUST INSTALL AL1 ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF CONTRA.CTOR AND/OR OWNER FAIL TO DO 60, THEY AGREE TO JOINn Y AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS TI-IAT ENGINEER INCURS AS A RESULT OF SAID FAILURE.
29. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BYTHE SIGNATORY PROFESSIONAL ENGINEER, Tl-IE USE OF THE WORDS CERTIFY OR CERTIFICATION CONSTITUTES AN EXPRESSION OF •PROFESSIONAL OPINION• REGARDING THE INFORMATION WHCH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED.
REVISIONS
REV DATE COMMENT BY
11128117 REVISED PER UPCATED ENPI BUILDING FOOTPR.INT MAM REVISED PER ENPI CLIENT COYl.tENT MAM 2 01/05/18
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQUIRES
;, WORKING DATSNOTlCE FO'C CC..SlRUCTION PHASE AND 10
WOO<IN3 DAYS IN DESIGN
STAG~ - STOP 0>.U.
~~!
POCS SERIAL NUMIER
20163131646 1-800-:U2-1776
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CADl.D.:
PROJECT:
PC161321 E.N.PJS.R.D. G.J.H. 2017.04.28 1"=30' PC161321BASE-2
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
-----FOR-----
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
1600 MANOR DRIVE, SUITE 200 CHALFONT, PENNSYLVANIA 18914
Phone: (215) QQ8..Q100 Fax: (215) QQ8..Q102 www.Boh/erEngineering.oom
G.J. HARTMAN
PROFESSIONAL ENGINEER
PENNSYL.VANIA LICENSE No. PE076453
Sl-EET TinE:
SITE PLAN
SHEET NUMBER:
1
OF7
( REVISION 2 -2018.01.05 )
DRAWING LEGEND
PROPERTY LINE RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
10
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING PARKING SPACE COUNT
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL
EXISTING STORMWATER PIPE
EXISTING SANITARY SEWER PIPE EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING OPTIC LINE
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING OVERHEAD LINE
EXISTING TREE BOX TO BE REMOVED
GENERAL DEMOLITION NOTES
1. THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY:
· SURVEY
CONTROL POINT ASSOCIATES, INC. 1600 MANOR DRIVE SUITE 210 CHALFONT, PA 18914 ENTITLED: "BOUNDARY & PARTIAL TOPOGRAPHIC SURVEY" PREPARED FOR: EAST GOSHEN ELEMENTARY SCHOOL SHEETS: 1-4 FILE NO: 02-160513-00 DATED: 2017.12.15 LAST REVISED: 2017-01-27
2. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 et seq.), AS AMENDED AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME.
3. BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME.
4. THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION, ONLY, REGARDING ITEMS TO BE DEMOLISHED AND/OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE PLAN DRAWINGS AND INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS.
5. CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE SAFETY STANDARDS, OR THE SAFETY OF THE CONTRACTOR OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT, WITH BOHLER ENGINEERING, IN WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES.
6. PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO:
A. OBTAINING ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND OTHER PUBLIC
AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND DEMOLITION WORK.
7. ALL DEMOLITION ACTIVITIES ARE TO BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS, AND REFERENCED DOCUMENTS AS WELL AS ALL FEDERAL, STATE AND LOCAL REGULATIONS. ANY DISCREPANCIES OR DEVIATIONS SHALL BE IDENTIFIED BY THE CONTRACTOR TO THE ENGINEER IN WRITING FOR RESOLUTION PRIOR TO INITIATION OF ACTIVITY.
8. PRIOR TO STARTING ANY DEMOLITION CONTRACTOR IS RESPONSIBLE FOR/TO:
A. ENSURE COPIES OF ALL PERMITS AND APPROVALS ARE ON SITE FOR REVIEW.
B. THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE PRIOR TO SITE DISTURBANCE.
C. ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE,
CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE, SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES.
D. PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE SYSTEMS THAT ARE NOT BEING REMOVED DURING ALL DEMOLITION ACTIVITIES.
E. FAMILIARIZE THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENT AND IS RESPONSIBLE FOR ALL
COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR PROJECT. THE CONTRACTOR SHALL PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTION AND UTILITY COMPANY REQUIREMENTS.
F. COORDINATION WITH UTILITY COMPANIES REGARDING WORKING "OFF-PEAK" HOURS OR ON WEEKENDS AS MAY BE REQUIRED TO
MINIMIZE THE IMPACT ON THE AFFECTED PARTIES.
G. A COMPLETE INSPECTION FOR CONTAMINANTS, BY A LICENSED ENVIRONMENTAL TESTING AGENCY, OF ALL BUILDINGS AND/OR
STRUCTURES TO BE REMOVED SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL ENVIRONMENTAL REGULATIONS. ALL CONTAMINANTS SHALL BE REMOVED AND DISPOSED OF BY A FEDERALLY LICENSED CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. ALL ENVIRONMENTAL WORK INCLUDING HAZARDOUS MATERIAL, SOILS, ASBESTOS, OR OTHER REFERENCED OR IMPLIED HEREIN IS SOLELY THE RESPONSIBILITY OF THE OWNER'S ENVIRONMENTAL CONSULTANT.
9. THE CONTRACTOR SHALL PROVIDE ALL THE "MEANS AND METHODS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE.
10. IN THE ABSENCE OF SPECIFIC REQUIREMENTS, THE CONTRACTOR SHALL PERFORM EARTH MOVEMENT ACTIVITIES, DEMOLITION AND REMOVAL OF ALL FOUNDATION WALLS, FOOTINGS, AND OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE IN ACCORDANCE WITH DIRECTION BY OWNER'S GEOTECHNICAL ENGINEER.
11. EXPLOSIVES SHALL NOT BE USED WITHOUT PRIOR WRITTEN CONSENT OF BOTH THE OWNER AND APPLICABLE GOVERNMENTAL AUTHORITIES. ALL THE REQUIRED PERMITS AND EXPLOSIVE CONTROL MEASURES THAT ARE REQUIRED BY THE FEDERAL, STATE, AND LOCAL GOVERNMENTS SHALL BE IN PLACE PRIOR TO STARTING AN EXPLOSIVE PROGRAM. THE CONTRACTOR IS ALSO RESPONSIBLE FOR ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES.
12. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH: THE "MANUAL ON UNIFORM TRAFFIC CONTROL," AS WELL AS FEDERAL, STATE, AND LOCAL REGULATIONS WHEN DEMOLITION RELATED ACTIVITIES IMPACT ROADWAYS OR ROADWAY RIGHTS-OF-WAY.
13. THE CONTRACTOR SHALL CONDUCT DEMOLITION ACTIVITIES IN SUCH A MANNER TO INSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND OTHER ADJACENT FACILITIES. STREET CLOSURE PERMITS MUST BE RECEIVED FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY WHERE REQUIRED.
14. DEMOLITION ACTIVITIES AND EQUIPMENT SHALL NOT USE AREAS OUTSIDE THE DEFINED PROPERTY LINES, WITHOUT WRITTEN PERMISSION OF THE OWNER, AND/OR APPROPRIATE GOVERNMENT AGENCY.
15. USE DUST CONTROL MEASURES TO LIMIT THE AMOUNT OF AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR TO WITHIN FEDERAL, STATE, AND/OR LOCAL STANDARDS. AFTER THE DEMOLITION IS COMPLETE, ADJACENT STRUCTURES AND IMPROVEMENTS SHALL BE CLEANED OF ALL DUST AND DEBRIS CAUSED BY THE DEMOLITION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE-DEMOLITION" CONDITION.
16. THE CONTRACTOR IS RESPONSIBLE TO SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE UNAUTHORIZED ENTRY OF PERSONS AT ANY TIME.
17. THIS DEMOLITION PLAN IS INTENDED TO IDENTIFY THOSE EXISTING ITEMS/CONDITIONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDED TO PROVIDE DIRECTION OTHER THAN THAT ALL METHODS AND MEANS ARE TO BE IN ACCORDANCE WITH STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE.
18. THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS OF DAMAGE TO ALL ITEMS THAT ARE TO REMAIN AS A RESULT OF HIS ACTIVITIES. ALL REPAIRS SHALL USE NEW MATERIAL. THE REPAIRS SHALL RESTORE THE ITEM TO THE PRE-DEMOLITION CONDITION.
19. DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE. ALL EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
10
10
13
4
4
11
6
9
15
5 6
EXISTING U.G. TANK, FUEL LINES, AND CONCRETE PAD
(TO BE REMOVED) (REFER TO MEP PLANS FOR
ADDITIONAL DETAILS ON
DEMOLITION)
EXISTING CONCRETE (TO BE REMOVED)
EXISTING SANITARY LATERAL TO BE PLUGGED AND CAPPED
2,863 SF EXISTING BUILDING TO BE REMOVED
EXISTING AREA LIGHT (TO BE REMOVED-TYP.)
EXISTING AREA LIGHT (TO BE REMOVED-TYP.)
PROP. SAWCUT (TYP.)
PROP. SAWCUT (TYP.)
UTILITIES:
UTILITY COMPANY PHONE NUMBER
THE FOLLOWING COMPANIES WERE NOTIFIED BY PENNSYLVANIA ONE-CALL SYSTEM (1-800-242-1776) AND REQUESTED TO MARK OUT UNDERGROUND FACILITIES AFFECTING AND SERVICING THIS SITE. THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED UPON THE UTILITY COMPANIES RESPONSE TO THIS REQUEST. SERIAL NUMBER: 20163131545
AQUA PENNSYLVANIA, INC.
AT & T COMCAST CABLE COMMUNICATIONS, INC.
COMCAST CABLEVISION EAST GOSHEN TOWNSHIP
INTERSTATE ENERGY
PECO SUNOCO PIPELINE TRANS CONTINENTAL GAS PIPE CORP.
VERIZON
610-525-1400 215-233-3474 215-918-3137 215-961-3800 610-692-7171 610-933-4300 610-292-8057 215-669-3232 610-644-7373 800-479-1919
STATUS
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
COMMENTS
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
HYDROLOGIC SOIL GROUP
- HATBORO SILT LOAM
B
DESCRIPTION SOIL
- GLADSTONE GRAVELLY LOAM, 3 TO8 PERCENT SLOPES GdB
SOIL DESCRIPTIONS
B/D Ha
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-2\PC161321BASE-2----->LAYOUT: 02-EXISTING CF
1600 MANOR DRIVE, SUITE 200 CHALFONT, PENNSYLVANIA 18914
Phone: (215) 996-9100 Fax: (215) 996-9102 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
7
REVISION 2 - 2018.01.05
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-2
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017,2018 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1 11/28/17 REVISED PER UPDATED BUILDING FOOTPRINT
ENP/ MAM
2 01/05/18 REVISED PER CLIENT COMMENT
ENP/ MAM
1"=30'
EXISTING CONDITIONS &
DEMOLITION
PLAN
2
DRAWING LEGEND
PROPERTY LINE RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL
EXISTING STORMWATER PIPE
EXISTING SANITARY SEWER PIPE EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING OPTIC LINE
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING OVERHEAD LINE
PROPOSED CLEAN OUT
RD
PROPOSED SANITARY MANHOLE
PROPOSED STORMWATER PIPE
PROPOSED SANITARY SEWER PIPE
PROPOSED ROOF DRAIN
CO
PROPOSED LIGHT POLE
1. LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE INDEPENDENTLY CONFIRMED WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS MUST BE INDEPENDENTLY CONFIRMED BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES MUST IMMEDIATELY BE REPORTED, IN WRITING, TO THE ENGINEER. CONSTRUCTION MUST COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PITS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
2. CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL EXISTING UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION, AT NO COST TO THE OWNER. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT AND/OR DISCREPANCY BETWEEN THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE OR APPLICABLE CODES, REGULATIONS, LAWS, RULES, STATUTES AND/OR ORDINANCES, IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD, IN WRITING, OF SAID CONFLICT AND/OR DISCREPANCY PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR'S FAILURE TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE CONTRACTOR'S FULL AND COMPLETE ACCEPTANCE OF ALL RESPONSIBILITY TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE
WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS, LAWS, STATUTES, ORDINANCES AND CODES AND, FURTHER, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SAME.
4. THE CONTRACTOR MUST LOCATE AND CLEARLY AND UNAMBIGUOUSLY DEFINE VERTICALLY AND HORIZONTALLY ALL ACTIVE AND INACTIVE UTILITY AND/OR SERVICE SYSTEMS THAT ARE TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE AND INACTIVE SYSTEMS THAT ARE NOT BEING REMOVED/RELOCATED DURING SITE ACTIVITY.
5. THE CONTRACTOR MUST FAMILIARIZE ITSELF WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES.
6. THE CONTRACTOR MUST INSTALL ALL STORM SEWER AND SANITARY SEWER COMPONENTS WHICH FUNCTION BY GRAVITY PRIOR TO THE INSTALLATION OF ALL OTHER UTILITIES.
7. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS/DETAILS, DOOR ACCESS,
AND EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITIES/SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND TO ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS WITH JURISDICTION AND/OR CONTROL OF THE SITE, AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE A CONFLICT(S) EXISTS BETWEEN THESE PLANS AND THE ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER, IN WRITING, AND PRIOR TO CONSTRUCTION, RESOLVE SAME.
8. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE MUST INCLUDE ALL FEES, COSTS, TESTING AND
APPURTENANCES REQUIRED BY THE UTILITY COMPANY TO PROVIDE FULL AND COMPLETE WORKING SERVICE. CONTRACTOR MUST CONTACT THE APPLICABLE UTILITY COMPANY TO CONFIRM THE SIZE AND TYPE OF WATER METER AND/OR VAULT, PRIOR TO COMMENCING CONSTRUCTION.
9. ALL NEW UTILITIES/SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED UNDERGROUND. ALL NEW UTILITIES/SERVICES MUST BE INSTALLED IN ACCORDANCE WITH THE UTILITY/SERVICE PROVIDER INSTALLATION SPECIFICATIONS AND STANDARDS.
10. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE REPORT OF GEOTECHNICAL INVESTIGATION REFERENCED IN THIS PLAN SET. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN THE REPORT OF GEOTECHNICAL INVESTIGATION. ALL EXCAVATED OR FILLED AREAS MUST BE COMPACTED AS OUTLINED IN THE REPORT OF GEOTECHNICAL INVESTIGATION. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE REPORT OF GEOTECHNICAL INVESTIGATION AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE IS TO BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE REPORT OF GEOTECHNICAL INVESTIGATION. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE REPORT OF GEOTECHNICAL INVESTIGATION AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES.
11. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE AS PER THE RECOMMENDATIONS PROVIDED IN THE REPORT OF GEOTECHNICAL INVESTIGATION AND MUST BE COORDINATED
WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL AND COMPACTION MUST, AT A MINIMUM, COMPLY WITH THE STATE DOT REQUIREMENTS AND SPECIFICATIONS AND CONSULTANT SHALL HAVE NO LIABILITY OR RESPONSIBILITY FOR OR
AS RELATED TO FILL, COMPACTION AND BACKFILL.
12. THE CONTRACTOR MUST COMPLY, TO THE FULLEST EXTENT, WITH THE LATEST OSHA STANDARDS AND REGULATIONS, AND/OR ANY OTHER AGENCY WITH JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING PROCEDURES AND CONSULTANT SHALL HAVE NO RESPONSIBILITY FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES.
13. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES, AND EXCEPT FOR EDGE OF BUTT JOINTS, MUST EXTEND TO THE FULL DEPTH OF THE EXISTING PAVEMENT. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED.
14. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, UTILITY VALVES, AND SANITARY CLEANOUTS MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROPOSED GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES.
15. DURING THE INSTALLATION OF SANITARY SEWER, STORM SEWER, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS-INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY INSTALLATIONS THAT DEVIATE FROM THE INFORMATION CONTAINED IN THE UTILITY PLAN. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THESE PLANS, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER
AT THE COMPLETION OF WORK.
16. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. CONTRACTOR MUST CONFIRM AND ENSURE 0.75% MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5% MINIMUM ON ASPHALT (EXCEPT WHERE ADA REQUIREMENTS LIMIT GRADES), TO PREVENT PONDING. CONTRACTOR MUST IMMEDIATELY IDENTIFY, IN WRITING TO THE ENGINEER, ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT PROVIDING PROPER NOTIFICATION, THIS SHALL BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE DESIGN ENGINEER FOR ANY DAMAGES, COSTS, INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM SAME.
17. PROPOSED TOP OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS OTHERWISE NOTED. IT IS CONTRACTOR'S OBLIGATION TO ENSURE THAT DESIGN ENGINEER APPROVES FINAL CURBING CUT SHEETS PRIOR TO INSTALLATION OF SAME.
18. REFER TO SITE PLAN FOR ADDITIONAL NOTES.
19. IN THE EVENT OF DISCREPANCIES AND/OR CONFLICTS BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN WILL TAKE PRECEDENCE AND CONTROL. CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER, IN WRITING, OF ANY DISCREPANCIES AND/OR CONFLICTS.
20. CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO ENGINEER AND OWNER PRIOR TO INITIATING ANY WORK.
21. TOP AND BOTTOM OF WALL ELEVATIONS (TW & BW) REPRESENT THE PROPOSED FINISHED GRADE AT THE FACE OF WALL AND DO NOT REPRESENT THE ELEVATION OF THE PROPOSED WALL (INCLUDING THE CAP UNIT OR FOOTING). WALL FOOTINGS/FOUNDATION ELEVATIONS ARE NOT IDENTIFIED HEREIN AND ARE TO BE SET/DETERMINED BY THE CONTRACTOR BASED ON FINAL STRUCTURAL DESIGN SHOP DRAWINGS PREPARED BY THE APPROPRIATE PROFESSIONAL LICENSED IN THE STATE WHERE THE CONSTRUCTION OCCURS. THE CONTRACTOR MUST ENSURE ALL WALLS SHOWN HEREON MUST BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER AND THAT SIGNED AND SEALED SHOP DRAWINGS ARE APPROVED BY THE MUNICIPALITY PRIOR TO THEIR CONSTRUCTION. FURTHER THE CONTRACTOR SHALL ENSURE THAT FENCING, GUIDERAIL, UTILITIES, AND OTHER SITE AMENITIES IN THE VICINITY OF THE RETAINING WALL(S), PROPOSED SCHEMATICALLY IN THESE PLANS, SHALL BE CONSIDERED AND INCORPORATED INTO THE RETAINING WALL DESIGN (BY OTHERS).
22. STORM DRAINAGE PIPE:
UNLESS INDICATED OTHERWISE, ALL STORM SEWER PIPE MUST BE REINFORCED CONCRETE PIPE (RCP) CLASS III
WITH JOINTS. WHEN HIGH-DENSITY POLYETHYLENE PIPE (HDPE) IS CALLED FOR ON THE PLANS, IT MUST CONFORM TO AASHTO M294 AND TYPE S ( SMOOTH INTERIOR WITH ANGULAR CORRUGATIONS) WITH GASKET FOR WATERTIGHT JOINT. PVC PIPE FOR ROOF DRAIN CONNECTION MUST BE SDR 26 OR SCHEDULE 40 UNLESS INDICATED OTHERWISE.
23. SANITARY SEWER MAIN MUST BE POLYVINYL CHLORIDE (PVC) SDR 35 EXCEPT WHERE INDICATED OTHERWISE. SANITARY LATERALS MUST BE PVC SCHEDULE 40 OR PVC SDR 26 UNLESS INDICATED, IN WRITING, OTHERWISE.
24. STORM AND SANITARY SEWER PIPE LENGTHS INDICATED ARE NOMINAL.
25. SEWERS CONVEYING SANITARY FLOW, COMBINED SANITARY, AND STORMWATER FLOW OR INDUSTRIAL FLOW MUST BE SEPARATED FROM WATER MAINS BY A DISTANCE OF AT LEAST 10 FEET HORIZONTALLY. IF SUCH LATERAL SEPARATION IS NOT POSSIBLE, THE PIPES MUST BE IN SEPARATE TRENCHES WITH THE SEWER AT LEAST 18 INCHES BELOW THE BOTTOM OF THE WATER MAIN, OR SUCH OTHER SEPARATION AS APPROVED BY THE GOVERNMENT AGENCY WITH JURISDICTION OVER SAME.
26. WHERE APPROPRIATE SEPARATION FROM A WATER MAIN IS NOT POSSIBLE, THE SEWER MUST BE ENCASED IN CONCRETE, OR CONSTRUCTED OF DUCTILE IRON PIPE USING MECHANICAL OR SLIP-ON JOINTS FOR A DISTANCE OF AT LEAST 10 FEET ON EITHER SIDE OF THE CROSSING. IN ADDITION, ONE FULL LENGTH OF SEWER PIPE SHOULD BE LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. WHERE A WATER MAIN CROSSES UNDER A SEWER, ADEQUATE STRUCTURAL SUPPORT FOR THE SEWER MUST BE PROVIDED.
27. WATER MAIN PIPING MUST BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL WATER AUTHORITY ABSENCE OF SUCH REQUIREMENTS, WATER MAIN PIPING MUST BE CEMENT}LINED DUCTILE IRON (DIP) MINIMUM CLASS 52 THICKNESS. ALL PIPE AND APPURTENANCES MUST COMPLY WITH THE APPLICABLE AWWA STANDARDS IN EFFECT AT THE TIME OF APPLICATION.
28. CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING SEWER, WATER AND STORM SYSTEMS, MUST BE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND/OR DOT DETAILS AS APPLICABLE. CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME.
29. CONSULTANT IS NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, SHALL HAVE NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY.
GENERAL GRADING & UTILITY NOTES
F F F F F F F F F
F
F F
F F
F F F F F F F F
F F F F F
F
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
REFER TO MEP PLANS FOR EXACT CONNECTION LOCATION TO BUILDING
PROP. 6" PVC SANITARY LATERAL
INV = 398.37
INV = 397.90 INV = 391.78
90 LF 8" PVC @1.90%
PROP. 177 LF 6"
PVC @ 1%
202 LF 8" PVC @1.90%
CONNECT TO EXISTING 6" PVC
PROP. 8" ROOF DRAIN
INV = 394.95
INV = 391.11
F
F
PROP. CONNECTION TO EXISTING 12" WATER MAIN
PROP. 6' X 9'
METER PIT
WITH FDC
PROP. 6" DIP FIRE SERVICE
41.7'± (REFER TO PLUMBING PLANS
FOR EXACT LOCATION OF
NEW SANITARY LATERAL)
PROP. CROSSING BOTTOM SANITARY = 396.90 TOP STORM = 392.25 CLEARANCE = 4.65'
PROP. CONNECTION INV = 390.07 ± (CALC'D; NOT FIELD VERIFIED)
PROPOSED 2-STORY BUILDING ADDITION
(22,792 SF TOTAL)
PROPOSED 1-STORY BUILDING ADDITION
(2,221 S.F.)
PROP. FIRE HYDRANT
404.50
10'
404.50
402.50
405.00
FF=405.16
405.16
FF=406.69
FF=399.54
402
404
RD INV = 392.65
PROP. 8" ROOF DRAIN
INV = 393.45 PROP. CROSSING BOT. SAN.= 394.73 TOP STORM= 393.76
CLEARANCE= 0.97'
40 LF 8" PVC @2.00%
PROP. CROSSING BOT. STORM= 394.66 TOP SAN.= 391.16 CLEARANCE= 3.50'
EXISTING SANITARY LATERAL TO BE
PLUGGED AND
CAPPED
402
403
405
404
TEMPORARY CONSTRUCTION LAYDOWN
/ STAGING AREA
PROP. TEMPORARY
ACCESS TO CONSTRUCTION
STAGING AREA
PROP. 15 LF 6" PVC ROOFDRAIN @2.00%
INV = 398.36
ENTIRE STONED STAGE AREA TO BE
RESTORED FROM
COMPACTION (REFER TO SOIL
COMPACTION RESTORATION SPECIFICATIONS)
PROP. LIGHT POLE (TYP.) (REFER TO ELECTRICAL PLANS FOR DETAILS, SPECIFICATIONS, CONDUITS, ETC.)
PROP. FDC AND "FIRE DEPARTMENT CONNECTION" SIGN
F F F F F F F F
PROP. 4" DIP FIRE SERVICE
CONTRACTOR TO INSTALL PROP. WATER LINE TO AVOID EXISTING
PLAY STRUCTURES TO THE GREATEST EXTENT POSSIBLE
RD
INV = 398.06
EXTEND EXISTING ROOF DRAIN PIPING UNDERGROUND AND CONNECT TO EXISTING INLET
PROP. 6" PVC ROOFDRAIN @2.00% (MIN.)
INV = 401.50
ADJUST/RAISE MANHOLE RIM ELEVATION TO GRADE
RD
OH OH OH
OH OH OH OH OH
OH OH OH OH
PROP. TEMPORARY UTILITY POLE (REFER TO ELECTRICAL
PLAN FOR DETAILS)
PROP. SAWCUT (TYP.)
CO
PROP. SAWCUT (TYP.)
F
PROP. PIV - REFER TO DETAIL. PROVIDE
PROP. CONC. BOLLARDS FOR PROTECTION (4)
F F F F F F F F
F F F
PROP. CONC. BOLLARDS (PROVIDE
3' MIN. CLEARANCE)
ADJUST INLET GRATE ELEVATION TO BE ON GRADE=404.25±
403
404
405
402 401
PROP. 6" DIP FIRE SERVICE
UTILITIES:
UTILITY COMPANY PHONE NUMBER
THE FOLLOWING COMPANIES WERE NOTIFIED BY PENNSYLVANIA ONE-CALL SYSTEM (1-800-242-1776) AND REQUESTED TO MARK OUT UNDERGROUND FACILITIES AFFECTING AND SERVICING THIS SITE. THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED UPON THE UTILITY COMPANIES RESPONSE TO THIS REQUEST. SERIAL NUMBER: 20163131545
AQUA PENNSYLVANIA, INC.
AT & T COMCAST CABLE COMMUNICATIONS, INC.
COMCAST CABLEVISION EAST GOSHEN TOWNSHIP
INTERSTATE ENERGY
PECO SUNOCO PIPELINE TRANS CONTINENTAL GAS PIPE CORP.
VERIZON
610-525-1400 215-233-3474 215-918-3137 215-961-3800 610-692-7171 610-933-4300 610-292-8057 215-669-3232 610-644-7373 800-479-1919
STATUS
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
COMMENTS
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-2\PC161321BASE-2----->LAYOUT: 03-GRADING-UTILITY CF
1600 MANOR DRIVE, SUITE 200 CHALFONT, PENNSYLVANIA 18914
Phone: (215) 996-9100 Fax: (215) 996-9102 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
7
REVISION 2 - 2018.01.05
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-2
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017,2018 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1 11/28/17 REVISED PER UPDATED BUILDING FOOTPRINT
ENP/ MAM
2 01/05/18 REVISED PER CLIENT COMMENT
ENP/ MAM
1"=30'
GRADING/
UTILITY
PLAN
3
' ' ' '
10' WIDE EASEMENT
\
\
\ JN/ET \ GflT=IOl.42\ lll>(A)=J97."' INV(B)=.J97.42 \
\\;,,APPROX. LOC. OF \
·n~G. ElEC. l/NE (i-crr\'<.""rrr MN?KOIJT)
\\
\\
\\
\\
£0.P.
/
AREA CONVEYED ro WEST CHESTE!i SCHOOL DISTRICT (D.B. 3761, F'G. 450} '-cRAss,
AR£4 ' /_ Jf2 SIGN ·ML.---,, 'uis'T GOSHEN
ELEMENTARY SCHOOL n
\ ' PLASTIC BORDER \
\\ PROP.CONG.
' ' ' \
I
\
I
\
\
I
\ ', \ \' \ \ '- Gli'ASS ~,
\ AR£4 ~ \ \ \ \ \ \ \ \ \ \ ' ' \ \ \ \
10 SIGN "EAST GOSHENN
\ \
CONTRACTOR TO INSTALL PROP. WATER LINE TO AVOID EXISTING
PLAY STRUCRIRES TO THE GREATEST EXTENT POSSIB.E
\
I
I
I
I
\
I
\
\
\
\ ' \ ........._ ' I \\~ """~~
'-.... ....._ BlEACH[RS -........_ '-.....
\
\
\
\
\
\\
\\
\\
\\
BOLlARIJS (PROVIDE
3' MIN. CLEARAJ«E)
BASKt.7 BAU HOOP
PROP.4'DIP FIRE SERVICE
\ ' ' ' I
I
I
\
\
' I
' \
\
I LA YDOWN AREA
\
\
\
\
\
\
\
\
PROVIDED WITHY MAT OR EQUIVALENT \
\
' ' ' \
\ '
' ' ' '
\ '
' ' '
' '
'
' ' ' ' '
' ' ' ' ' ~-~---~ ' '
' ' '
' ' ' ' ' ' ' ' ENTIRE STONED STAGE AREA TO BE
RESTORED FROM
COMPACTION (REFER TO SOIL
COMPACTION RESTORATION
\
'
' ' '
PROP. lEt.l'OR.IRY '\ ACCESS TO
) \ ',,, ~ 11' ' \ SMH \ Rlttl=J92.26 <-<:"~
~}=382.69 .:::::JNV{BR382.42
~ ' ~ ~'
CONSTRUCTION -...... '>-.,yv"\f';::_.__..,.
STAGING AREA
I
\ SM1I Rfl.r-386.11 IMl(A}=373. 93 .IN'/(8)=373.11 rN'l(C)=JlJ.57 .IM/(£)=373.51
REFERTOMEP PLANS FOR EXACT CONNECTION LOCATION TO BUILDING
CONC. RAMP
W. 'HANDRAIL
PROP. TEMPORARY llTILITY POLE (REFER TO ELECTRICAL
PLAN FOR DETAILS)
T.M.P. !U-4-82.0
W#JS N,/r SCIWFEll llllRll1Ei l1C
0.8. )NI ll"l 6J7
EDGE or '{{()ODS
T .M.P. 53-4-78.0E
PROP. 9'x9' CONCRETE
PROP.12" SILTSOXX
N,/r W#JS tF llEST OIES1fll .-
SCll(J()/. IJIS1Htr:T D.B. 2495. ll"l 5H
LOOAREA=5,153S.F.
EXISTING SANllAHY
IATFRAI
Af'f'ROX. LOC. OF U.G. S#l!TARY UHE
HID • Glff=J!JIJ.75 15 CMP tNV(A)=.J95.P2 INV(B)=.J95.12
PROP.8' ROOF DRAIN
INV =394.95
PROP. CROSSING BOT. STORM= 394.66 TOP SAN.= 391.16 CLEARANCE= 3.50'
LAND CONVf'IED TO
T.M.P. SJ-4-82.2 ro.B. 3768, PG. 829}
LCD AREA =4,729 S.F.
PROP. CONG.AREA
(139SF) PROPOSED 2-STORY BUILDING ADDITION
(22,792 SF TOTAL)
PROP. CROSSING BOT. SAN.= !3114.73 TOP STORM= 393.78
CLEARANCE= o.sr
PROP.8" ROOF DRAIN
INV= 393.45
I I
/Nl£T GRT=40077 !NV--397.76
I I /
T.M.P. 53-1-79.0
w;os N,/r CN1RrJl1 E SJNtXEIT o.s. J827, PC. m
;
/
Sl])jj'ACE - - - /CON!JiNetr" -- t y
(
APPROX. LOC. OF U.G. SroRM LINE
lf'PROX. lCC. OF
U.G. £/LC. UNE (PER lffllfTY MARKOUT)
T .M.P. SJ-1-78.0E
N,/r W#JS tF llEST CllESlER .-
SCll(J()/. DISTllfCT 0.8. 2495. ll"l 5H
PROP. CROSSING BOTTOM SANITARY = 398.911 TOP STORM = 392.25 CLEARANCE =4.65'
APPROX. l~ OF// ~~~~ WT) __ -----.,-
6 SIGN // "Srop·
--------
"DRUNK ORl::S. l
DESTROY L/1-£5{
-- -397- - - --hW
PROP. 6" PVC SANITARY LATERAL
INV=398.37
---
s1c"'N-'--'-,;;~~~~~-J "EXJT ONLYU
SIGN "END SCHOOL
---TN-
T .M.P. 5:1+80.J
w;os N,/r /lllJRNIMIE M£STll£NT lll10llP
D.S. ""'· PC. 69J
R.OW LINE
'"'
SOILS MAP
1 "-500'
0 ""
SOIL DESCRIPTIONS
GdB
Ha
DESCRIPTION HYDROLOGIC SOIL GROUP
• GLADSTONE GRAVELLY LOAM, 3 TOB PERCENT SLOPES
·HATBORO SILT LOAM
B
BID
SEQUENCE OF CONSTRUCTION
A ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING
SEQUENCE. EACH STAGE SHALL BE COMPLETED IN OOMPLIANCE WllH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING SHM.1.. BE LIMITED ONLY TO lHOSE AREAS DESCRIBED IN EACH STAGE. UPON COMPLETION OR TEMPORARY CESSATION OF lHE EARTH DISTIJRBANCE ACTIVITY THAT WILL EXCEED FOUR(4) DAYS, DR ANY STAGE lHEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION.
B. AT LEAST SEVEN (7) DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE
OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES INCLUDING, BUT NOT LIMITED TO: THE LANDOWNER AND ALL APPROPRIATE MUNICIPPL OFFICIALS. ALSO, AT LEAST THREE (3) DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, All CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR BURIED lJTILITIES LOCATION.
C. BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN
OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE CIVIL ENGINEER. lHE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING TI-IE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR Sl-W.L IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLLJTION_
D. THE TERM 'PERMANENT STABILIZATION' USED THROUGHOUT THIS SEQUENCE IS MEANT TO
DESCRIBE THE PROPER Pl.ACING, GRADING, CONSTRUCTING, REINFORCING, LINING, AND COVERING OF SOIL, ROCK OR EARTH TO ENSURE THEIR PERMANENT RESISTANCE TO EROSION, SLIDING OR OTHER MOVEMENT. FOR AN EARTll DISTURBANCE TO BE PERMAN EN Tl Y STABILIZED, THE DISTURBED AREA SHALL BE COVERED WITH ONE OF Tl-E FOLLOWING: A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF
RESISTINGACCEL~RATED EROSION AND SEDIMENTATION; OR AN ACCEPTABLE BMPTHAT PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION.
1. INSTAU. CONSTRUCTION AS DESIGNATED ON THE PLANS.
2. INSTALL All PERIMETER [COMPOST FILTER SOCKS, SILT FENCE, TREE PROTECTION FENCING, CONSTRUCTION FENCING, INLET PROTECTION] WITHIN THE DESIGNATED LIMIT OF DISTURBANCE AS INDICATED ON THE PLANS. ONLY LIMITED CLEARING AND GRUBBING NECESSARY TO INSTALL THE PERIMETER EROSION AND SEDIMENT POLLUTION CONTROLS IS PERMITTED.
3. REFER TO THE PHASING PLAN FOR SPECIFIC SEQUENCING FOR EACH PHASE OF CONSTRUCTION.
4. PERFORM DEMOLITION OF EXISTING FEATURES NOTED TO BE REMOVED.
5. INITIATE BUILDING CONSTRUCTION.
6. INSTAU. UTILITIES (SANITARY, STORM, WATER) PRIOR TO CONNECTIONS IN CHESTER ROAD, THE APPROPRIATE TRAFFIC OONTROL MEASURES ARE TO BE IN PLACE.
7_ INSTALL BITUMINOUS PAVEMENT AND CONCRETE RESTORATION IN ANY lJTILITYTRElllCHING AREAS.
8. INSTALL FINAL VEGETATION AND RESTORE LANDSCAPING THAT IS DISTLRBED BY UTILITY TRENCHING.
9. UPON PERMANENT STABILIZATION, REMOVE ANY REMAINING EROSION AND SEDIMENT CONTROL FACILITIES. ANY AREA DISTURBED DURING THE REMOVAL OF EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE STABILIZED IMMEDIATELY.
1 D. CLEAR SITE OF DEBRIS AND ALL UNWANTED MATERIALS. OPERATOR SHALL REMOVE FROM SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WAS1ES IN ACCORDANCE WITH THE DEPARTMENrs SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP OR DISCHARGE ANY BUILDING MATERIAL OR WASTE AT THIS SITE.
11. DEMOBILIZE.
DRAWING LEGEND
----390----
PROPERTY LINE RIGHT-OF-WAY LINE ADJACENT PROPERTY LINE
EXISTING FENCE LINE EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL EXISTING STORMWATER PIPE EXISTING SANITARY SEWER PIPE -E---E---E- EXISTING ELECTRIC LINE -C C C-- EXISTING GAS LINE -r T T EXISTING OPTIC LINE -c ' ,__ EXISTING GAS LINE -w W W-- EXISTINGWATERLINE -OH OI! OH-- EXISTING OVERHEAD LINE
EXISTING TREE LINE ~ EXISTING AREA LIGHT
@ EXISTING SANITARY MANHOLE
@ EXISTING STORMWATER MANHOLE == EXISTING INLET
~ EXISTING WATER VALVE
~ o EXISTING ROOF DRAIN
oi;m EXISTING GLEAN OUT
..... EXISTING UTILITY POLE
-v- EXISTING SIGN
.D., EXISTING FIRE HYDRANT 0 EXISTING TREE
----------------------------- PROPOSED STORMWATER PIPE -s---s;---s-- PROPOSED SANITARY SEWER PIPE
PROPOSED LIMIT OF DISTIJRBANCE
PROPOSED SANITARY MANHOLE
PROPOSED ROOF DRAIN
PROPOSED CLEAN OUT
PROPOSED LIGHT POLE
1"=30'
REVISIONS
REV DATE COMMENT BY
11128'17 REVISED PER UPDATED ENP/ BUILDING FOOTPRINT MAM REVISED PER ENP/ CLIENT COt.fv'IENT MAM 2 01/05'18
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQUIRES
3 WORKINC> DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING OATS IN DESIGN
STAGE-STOP CALL
POCS SERIAL NUl'.eER
20163131545
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CADl.D.:
PROJECT:
PC161321 E.N.PJS.R.D. GJ.H. 2017.04.28 1"=30' PC161321BASE-2
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
-----FOR-----
(
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNlY
PENNSYLVANIA
19380
1600 MANOR DRIVE, SUITE200 CHALFONT, PENNSYLVANIA 18814
Phone: (215) 998-9100 Fax: (215) 996-9102 www.BohlerEngineering.com
G.J. HARTMAN
PROFESSIONAL ENGINEER
PENNSYLVANIA LICENSE No. PE078453
SHEETTlnE:
SOIL EROSION &
SEDIMENT POLLUTION CONTROL PLAN
SHEET NUMBER:
4
OF7
REVISION 2- 2018.01.05 )
F F F F F F F F F
F
F F
F F
F F F F F F F F
F F F F F
F
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
40' SIDE YARD
SETBACK
40' SIDE YARD
SETBACK
40' SIDE YARD SETBACK
40' SIDE YARD
SETBACK
65' FRONT YARD SETBACK
40' SIDE YARD
SETBACK
75' REAR YARD SETBACK
F
F
41.7'± (REFER TO PLUMBING PLANS
FOR EXACT LOCATION OF
NEW SANITARY LATERAL)
402
404
RD
402
403
405
404
F F F F F F F F
RD
RD
OH OH OH
OH OH OH OH OH
OH OH OH OH
CO
F
F F F F F F F F
F F F
403
404
405
402 401
3 AABV
3 AABV
3 AABV
3 AABV
3 AABV
3 AABV
1 QB
1 QB
470 VM @ 15" O.C.
4 PIAB
7 TOG
KEY
LANDSCAPE SCHEDULE
QTY BOTANICAL NAME COMMON NAME SIZE REMARKS
SHADE TREE(S) QB 2 QUERCUS BOREALIS NORTHERN RED OAK 2 1/2-3" CAL. B+B
EVERGREEN TREE(S) PIAB 4 PICEA ABIES NORWAY SPRUCE 6-7' B+B TOG 7 THUJA X 'GREEN GIANT' GREEN GIANT ARBORVITAE 6-7' B+B 11
GROUND COVER VM 470 VINCA MINOR PERIWINKLE/MYRTLE PEAT POTS 2 YR. PLANTS
PERENNIAL(S) AABV 18 ASTILBE X ARENDSII 'BRIDAL VEIL' BRIDAL VEIL ASTILBE 1 GAL. CONTAINER
NOTE: IF ANY DISCREPENCIES OCCUR BETWEEN AMOUNTS SHOWN IN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE.
1"=1,000' LOCATION MAP
SITE
1"=30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-2\PC161321LANDSCAPE-2----->LAYOUT: 05-LANDSCAPE JP
1600 MANOR DRIVE, SUITE 200 CHALFONT, PENNSYLVANIA 18914
Phone: (215) 996-9100 Fax: (215) 996-9102 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
7
REVISION 2 - 2018.01.05
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321LANDSCAPE-2
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017,2018 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1 11/28/17 REVISED PER UPDATED BUILDING FOOTPRINT
ENP/ MAM
2 01/05/18 REVISED PER CLIENT COMMENT
ENP/ MAM
1"=30'
LANDSCAPE
PLAN
5
1. THIS PLAN IS TO BE UTILIZED FOR LANDSCAPE PURPOSES ONLY.
2. ALL DISTURBED UNPAVED AREAS, EXCLUDING PLANTING BEDS, ARE TO BE INSTALLED AS LAWN IN ACCORDANCE WITH LANDSCAPE SPECIFICATION #2.C., UNLESS OTHERWISE STATED ON THIS PLAN.
3. SHRUBS PLANTED ALONG HEAD-IN PARKING STALLS SHALL BE INSTALLED TO ALLOW A CLEARANCE OF TWO FEET FROM FACE OF CURB TO ALLOW FOR BUMPER OVERHANG.
4. IF IRRIGATION IS REQUIRED BY THE OWNER OR APPROVING MUNICIPALITY, THE CONTRACTOR SHALL PROVIDE AN IRRIGATION SYSTEM MEETING THE SPECIFICATIONS OF THE CHOSEN PRODUCT'S MANUFACTURER. THE IRRIGATION DESIGN SHALL ACCOMMODATE LAWN AND BED AREAS EACH UNDER SEPARATE ZONES TO MAXIMIZE WATER EFFICIENCY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ANY PERMITS REQUIRED FOR THE INSTALLATION OF AN IRRIGATION SYSTEM.
5. PLANT MATERIAL SUBSTITUTIONS MUST BE FORMALLY SUBMITTED TO BOHLER ENGINEERING AND THE MUNICIPAL ENGINEER AND LANDSCAPE CONSULTANTS FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. ANY PLANT MATERIAL THAT ARE TO BE INSTALLED WITHIN STORMWATER BMP FEATURES MUST BE NATIVE SPECIES.
6. WEED BARRIER FABRIC IS NOT RECOMMENDED WITHIN PLANTING BEDS. WITHOUT EXCEPTION, WEED BARRIER FABRIC SHALL NOT BE INSTALLED WITHIN ANY BMP FACILITY. BMP FACILITIES INCLUDE RAINGARDENS, INFILTRATION TRENCHES, VEGETATIVE SWALES AND STORMWATER BASINS.
GENERAL NOTES:
D. ALL LAWN AREAS ARE TO BE CULTIVATED TO A DEPTH OF SIX INCHES (6"). ALL DEBRIS EXPOSED FROM EXCAVATION AND CULTIVATION SHALL BE DISPOSED OF IN ACCORDANCE WITH GENERAL WORK PROCEDURES SECTION ABOVE. THE FOLLOWING SHALL BE TILLED INTO THE TOP FOUR INCHES (4") IN TWO DIRECTIONS (QUANTITIES BASED ON A 1,000 SQUARE FOOT AREA - FOR BID PURPOSES ONLY [SEE SPECIFICATION 6.A.]): I. 20 POUNDS 'GRO-POWER' OR APPROVED EQUAL SOIL CONDITIONER/FERTILIZER II. 20 POUNDS 'NITRO-FORM' (COURSE) 38-0-0 BLUE CHIP OR APPROVED NITROGEN FERTILIZER
E. THE SPREADING OF TOPSOIL SHALL NOT BE CONDUCTED UNDER MUDDY OR FROZEN CONDITIONS.
9. PLANTING A. INSOFAR THAT IT IS FEASIBLE, PLANT MATERIAL SHALL BE PLANTED ON THE DAY OF DELIVERY. IN THE EVENT THAT THIS IS NOT POSSIBLE, LANDSCAPE CONTRACTOR SHALL PROTECT UNINSTALLED PLANT MATERIAL. PLANTS SHALL NOT REMAIN UNPLANTED FOR LONGER THAN A THREE DAY PERIOD AFTER DELIVERY. PLANTS THAT WILL NOT BE PLANTED FOR A PERIOD OF TIME GREATER THAN THREE DAYS SHALL BE HEALED IN WITH TOPSOIL OR MULCH TO HELP PRESERVE ROOT MOISTURE.
B. PLANTING OPERATIONS SHALL BE PERFORMED DURING PERIODS WITHIN THE PLANTING SEASON WHEN WEATHER AND SOIL CONDITIONS ARE SUITABLE AND IN ACCORDANCE WITH ACCEPTED LOCAL PRACTICE. PLANTS SHALL NOT BE INSTALLED IN TOPSOIL THAT IS IN A MUDDY OR FROZEN CONDITION.
C. ANY INJURED ROOTS OR BRANCHES SHALL BE PRUNED TO MAKE CLEAN-CUT ENDS PRIOR TO PLANTING UTILIZING CLEAN, SHARP TOOLS. ONLY INJURED OR DISEASED BRANCHING SHALL BE REMOVED.
D. ALL PLANTING CONTAINERS, BASKETS AND NON-BIODEGRADABLE MATERIALS SHALL BE REMOVED FROM ROOT BALLS DURING PLANTING. NATURAL FIBER BURLAP MUST BE CUT FROM AROUND THE TRUNK OF THE TREE AND FOLDED DOWN AGAINST THE ROOT BALL PRIOR TO BACKFILLING.
E. POSITION TREES AND SHRUBS AT THEIR INTENDED LOCATIONS AS PER THE PLANS AND SECURE THE APPROVAL OF THE LANDSCAPE ARCHITECT PRIOR TO EXCAVATING PITS, MAKING NECESSARY ADJUSTMENTS AS DIRECTED.
F. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, THE PROPOSED LANDSCAPE, AS SHOWN ON THE APPROVED LANDSCAPE PLAN, MUST BE INSTALLED, INSPECTED AND APPROVED BY THE APPROVING AGENCY. THE APPROVING AGENCY SHALL TAKE INTO ACCOUNT SEASONAL CONSIDERATIONS IN THIS REGARD AS FOLLOWS. THE PLANTING OF TREES, SHRUBS, VINES OR GROUND COVER SHALL OCCUR ONLY DURING THE FOLLOWING PLANTING SEASONS: I. PLANTS: MARCH 15 TO DECEMBER 15 II. LAWN: MARCH 15 TO JUNE 15 OR SEPT. 1 TO NOVEMBER 1
PLANTINGS REQUIRED FOR A CERTIFICATE OF OCCUPANCY SHALL BE PROVIDED DURING THE NEXT APPROPRIATE SEASON AT THE MUNICIPALITY'S DISCRETION. CONTRACTOR SHOULD CONTACT APPROVING AGENCY FOR POTENTIAL SUBSTITUTIONS.
G. FURTHERMORE, THE FOLLOWING TREE VARIETIES ARE UNUSUALLY SUSCEPTIBLE TO WINTER DAMAGE. WITH TRANSPLANT SHOCK AND THE SEASONAL LACK OF NITROGEN AVAILABILITY, THE RISK OF PLANT DEATH IS GREATLY INCREASED. IT IS NOT RECOMMENDED THAT THESE SPECIES BE PLANTED DURING THE FALL PLANTING SEASON: ACER RUBRUM PLATANUS X ACERIFOLIA BETULA VARIETIES POPULUS VARIETIES CARPINUS VARIETIES PRUNUS VARIETIES CRATAEGUS VARIETIES PYRUS VARIETIES KOELREUTERIA QUERCUS VARIETIES LIQUIDAMBAR STYRACIFLUA TILIA TOMENTOSA LIRIODENDRON TULIPIFERA ZELKOVA VARIETIES
H. PLANTING PITS SHALL BE DUG WITH LEVEL OR CONVEX BOTTOMS, WITH THE WIDTH THREE TIMES THE DIAMETER OF ROOT BALL. THE ROOT BALL SHALL REST ON UNDISTURBED GRADE. EACH PLANT PIT SHALL BE BACKFILLED IN LAYERS WITH THE FOLLOWING PREPARED SOIL MIXED THOROUGHLY: I. 1 PART PEAT MOSS II. 1 PART COMPOSTED COW MANURE BY VOLUME III. 3 PARTS TOPSOIL BY VOLUME IV. 21 GRAMS 'AGRIFORM' PLANTING TABLETS (OR APPROVED EQUAL) AS FOLLOWS: A) 2 TABLETS PER 1 GALLON PLANT B) 3 TABLETS PER 5 GALLON PLANT C) 4 TABLETS PER 15 GALLON PLANT D) LARGER PLANTS: 2 TABLETS PER ½" CALIPER OF TRUNK
I. FILL PREPARED SOIL AROUND BALL OF PLANT HALF-WAY AND INSERT PLANT TABLETS. COMPLETE BACKFILL AND WATER THOROUGHLY.
J. ALL PLANTS SHALL BE PLANTED SO THAT THE TOP OF THE ROOT BALL, THE POINT AT WHICH THE ROOT FLARE BEGINS, IS SET AT GROUND LEVEL AND IN THE CENTER OF THE PIT. NO SOIL IS TO BE PLACED DIRECTLY ON TOP OF THE ROOT BALL.
K. ALL PROPOSED TREES DIRECTLY ADJACENT TO WALKWAYS OR DRIVEWAYS SHALL BE PRUNED AND MAINTAINED TO A MINIMUM BRANCHING HEIGHT OF 7' FROM GRADE. NO PRUNING SHALL BE CONDUCTED WITHIN THE FIRST YEAR OF PLANTING.
L. GROUND COVER AREAS SHALL RECEIVE A ¼" LAYER OF HUMUS RAKED INTO THE TOP 1" OF PREPARED SOIL PRIOR TO PLANTING. ALL GROUND COVER AREAS SHALL BE WEEDED AND TREATED WITH A PRE-EMERGENT CHEMICAL AS PER MANUFACTURER'S RECOMMENDATION.
M. NO PLANT, EXCEPT GROUND COVERS, GRASSES OR VINES, SHALL BE PLANTED LESS THAN TWO FEET (2') FROM EXISTING STRUCTURES AND SIDEWALKS.
N. ALL PLANTING AREAS AND PLANTING PITS SHALL BE MULCHED AS SPECIFIED HEREIN TO FILL THE ENTIRE BED AREA OR SAUCER. NO MULCH IS TO TOUCH THE TRUNK OF THE TREE OR SHRUB.
O. ALL PLANTING AREAS SHALL BE WATERED IMMEDIATELY UPON INSTALLATION IN ACCORDANCE WITH THE WATERING SPECIFICATIONS AS LISTED HEREIN.
10. TRANSPLANTING (WHEN REQUIRED) A. ALL TRANSPLANTS SHALL BE DUG WITH INTACT ROOT BALLS CAPABLE OF SUSTAINING THE PLANT. (SEE SPECIFICATION 2.F. ABOVE)
B. IF PLANTS ARE TO BE STOCKPILED BEFORE REPLANTING, THEY SHALL BE HEALED IN WITH MULCH OR SOIL, ADEQUATELY WATERED AND PROTECTED FROM EXTREME HEAT, SUN AND WIND.
C. PLANTS SHALL NOT BE DUG FOR TRANSPLANTING BETWEEN APRIL 10 AND JUNE 30.
D. UPON REPLANTING, BACKFILL SOIL SHALL BE AMENDED WITH FERTILIZER AND ROOT GROWTH HORMONE.
E. TRANSPLANTS SHALL BE GUARANTEED FOR THE LENGTH OF THE GUARANTEE PERIOD SPECIFIED HEREIN.
F. IF TRANSPLANTS DIE, SHRUBS AND TREES LESS THAN SIX INCHES (6") DBH SHALL BE REPLACED IN KIND. TREES GREATER THAN SIX INCHES (6") DBH MAY BE REQUIRED TO BE REPLACED IN ACCORDANCE WITH THE MUNICIPALITY'S TREE REPLACEMENT GUIDELINES.
11. WATERING A. NEW PLANTINGS OR LAWN AREAS SHALL BE ADEQUATELY IRRIGATED BEGINNING IMMEDIATELY AFTER PLANTING. WATER SHALL BE APPLIED TO EACH TREE AND SHRUB IN SUCH MANNER AS NOT TO DISTURB BACKFILL AND TO THE EXTENT THAT ALL MATERIALS IN THE PLANTING HOLE ARE THOROUGHLY SATURATED. WATERING SHALL CONTINUE AT LEAST UNTIL PLANTS ARE ESTABLISHED.
B. SITE OWNER SHALL PROVIDE WATER IF AVAILABLE ON SITE AT TIME OF PLANTING. IF WATER IS NOT AVAILABLE ON SITE, CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER. THE USE OF WATERING BAGS IS RECOMMENDED FOR ALL NEWLY PLANTED TREES.
C. IF AN IRRIGATION SYSTEM HAS BEEN INSTALLED ON THE SITE, IT SHALL BE USED TO WATER PROPOSED PLANT MATERIAL, BUT ANY FAILURE OF THE SYSTEM DOES NOT ELIMINATE THE CONTRACTOR'S RESPONSIBILITY OF MAINTAINING THE DESIRED MOISTURE LEVEL FOR VIGOROUS, HEALTHY GROWTH.
12. GUARANTEE A. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANTS FOR A PERIOD OF EIGHTEEN (18) MONTHS FROM APPROVAL OF LANDSCAPE INSTALLATION BY THE APPROVING AGENCY. CONTRACTOR SHALL SUPPLY THE OWNER WITH A MAINTENANCE BOND FOR FIFTEEN PERCENT (15%) OF THE VALUE OF THE LANDSCAPE INSTALLATION WHICH WILL BE RELEASED AT THE CONCLUSION OF THE GUARANTEE PERIOD AND WHEN A FINAL INSPECTION HAS BEEN COMPLETED AND APPROVED BY THE OWNER OR AUTHORIZED REPRESENTATIVE.
B. ANY DEAD OR DYING PLANT MATERIAL SHALL BE REPLACED FOR THE LENGTH OF THE GUARANTEE PERIOD. REPLACEMENT OF PLANT MATERIAL SHALL BE CONDUCTED AT THE FIRST SUCCEEDING PLANTING SEASON. ANY DEBRIS SHALL BE DISPOSED OF OFF-SITE, WITHOUT EXCEPTION.
C. TREES AND SHRUBS SHALL BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION AND UNTIL TURNOVER TO THE OWNER/OPERATOR. CULTIVATION, WEEDING, WATERING AND THE PREVENTATIVE TREATMENTS SHALL BE PERFORMED AS NECESSARY TO KEEP PLANT MATERIAL IN GOOD CONDITION AND FREE OF INSECTS AND DISEASE.
D. LAWNS SHALL BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION AND UNTIL TURNOVER TO THE OWNER/OPERATOR THROUGH WATERING, FERTILIZING, WEEDING, MOWING, TRIMMING AND OTHER OPERATIONS SUCH AS ROLLING, REGARDING AND REPLANTING AS REQUIRED TO ESTABLISH A SMOOTH, ACCEPTABLE LAWN, FREE OF ERODED OR BARE AREAS.
13. CLEANUP A. UPON THE COMPLETION OF ALL LANDSCAPE INSTALLATION AND BEFORE THE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL UNUSED MATERIALS, EQUIPMENT AND DEBRIS FROM THE SITE. ALL PAVED AREAS ARE TO BE CLEANED.
B. THE SITE SHALL BE CLEANED AND LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE OWNER OR AUTHORIZED REPRESENTATIVE.
1. SCOPE OF WORK: THE LANDSCAPE CONTRACTOR SHALL BE REQUIRED TO PERFORM ALL CLEARING, FINISHED GRADING, SOIL PREPARATION, PERMANENT SEEDING OR SODDING, PLANTING AND MULCHING INCLUDING ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY FOR THE COMPLETION OF THIS PROJECT, UNLESS OTHERWISE CONTRACTED BY THE GENERAL CONTRACTOR.
2. MATERIALS A. GENERAL - ALL HARDSCAPE MATERIALS SHALL MEET OR EXCEED SPECIFICATIONS AS OUTLINED IN THE STATE DEPARTMENT OF TRANSPORTATION'S SPECIFICATIONS.
B. TOPSOIL - NATURAL, FRIABLE, LOAMY SILT SOIL HAVING AN ORGANIC CONTENT NOT LESS THAN 5%, A PH RANGE BETWEEN 5.5-7.0. IT SHALL BE FREE OF DEBRIS, ROCKS LARGER THAN ONE INCH (1"), WOOD, ROOTS, VEGETABLE MATTER AND CLAY CLODS.
C. LAWN - LAWN AREAS SHALL BE SEEDED OR SODDED IN ACCORDANCE WITH THE PERMANENT STABILIZATION METHODS INDICATED WITHIN THE SOIL EROSION AND SEDIMENT CONTROL NOTES. FOR SOIL BED PREPARATIONS, REFER TO ITEM 8 BELOW. I. LAWN SEED MIXTURE SHALL BE FRESH, CLEAN NEW CROP SEED. II. SOD SHALL BE STRONGLY ROOTED, WEED AND DISEASE/PEST FREE WITH A UNIFORM THICKNESS. SOD INSTALLED ON SLOPES GREATER THAN 4:1 SHALL BE PEGGED TO HOLD SOD IN PLACE.
D. MULCH - ALL PLANTING BEDS SHALL BE MULCHED WITH A 3" THICK LAYER OF DOUBLE SHREDDED HARDWOOD BARK MULCH, UNLESS OTHERWISE STATED ON THE LANDSCAPE PLAN.
E. FERTILIZER I. FERTILIZER SHALL BE DELIVERED TO THE SITE MIXED AS SPECIFIED IN THE ORIGINAL UNOPENED STANDARD BAGS SHOWING WEIGHT, ANALYSIS AND NAME OF MANUFACTURER. FERTILIZER SHALL BE STORED IN A WEATHERPROOF PLACE SO THAT IT CAN BE KEPT DRY PRIOR TO USE. II. FOR THE PURPOSE OF BIDDING, ASSUME THAT FERTILIZER SHALL BE 10% NITROGEN, 6% PHOSPHORUS AND 4% POTASSIUM BY WEIGHT. A FERTILIZER SHOULD NOT BE SELECTED WITHOUT A SOIL TEST PERFORMED BY A CERTIFIED SOIL LABORATORY.
F. PLANT MATERIAL I. ALL PLANTS SHALL IN ALL CASES CONFORM TO THE REQUIREMENTS OF THE "AMERICAN STANDARD FOR NURSERY STOCK" (ANSI Z60.1), LATEST EDITION, AS PUBLISHED BY AMERICAN HORT (FORMERLY THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION). II. IN ALL CASES, BOTANICAL NAMES SHALL TAKE PRECEDENCE OVER COMMON NAMES FOR ANY AND ALL PLANT MATERIAL. III. PLANTS SHALL BE LEGIBLY TAGGED WITH THE PROPER NAME AND SIZE. TAGS ARE TO REMAIN ON AT LEAST ONE PLANT OF EACH SPECIES FOR VERIFICATION PURPOSES DURING THE FINAL INSPECTION. IV. TREES WITH ABRASION OF THE BARK, SUN SCALDS, DISFIGURATION OR FRESH CUTS OF LIMBS OVER 1¼", WHICH HAVE NOT BEEN COMPLETELY CALLUSED, SHALL BE REJECTED. PLANTS SHALL NOT BE BOUND WITH WIRE OR ROPE AT ANY TIME SO AS TO DAMAGE THE BARK OR BREAK BRANCHES. V. ALL PLANTS SHALL BE TYPICAL OF THEIR SPECIES OR VARIETY AND SHALL HAVE A NORMAL HABIT OF GROWTH: WELL DEVELOPED BRANCHES, DENSELY FOLIATED, VIGOROUS ROOT SYSTEMS AND BE FREE OF DISEASE, INSECTS, PESTS, EGGS OR LARVAE. VI. CALIPER MEASUREMENTS OF NURSERY GROWN TREES SHALL BE TAKEN AT A POINT ON THE TRUNK SIX INCHES (6") ABOVE THE NATURAL GRADE FOR TREES UP TO AND INCLUDING A FOUR INCH (4") CALIPER SIZE. IF THE CALIPER AT SIX INCHES (6") ABOVE THE GROUND EXCEEDS FOUR INCHES (4") IN CALIPER, THE CALIPER SHOULD BE MEASURED AT A POINT 12" ABOVE THE NATURAL GRADE. VII. SHRUBS SHALL BE MEASURED TO THE AVERAGE HEIGHT OR SPREAD OF THE SHRUB, AND NOT TO THE LONGEST BRANCH. VIII. TREES AND SHRUBS SHALL BE HANDLED WITH CARE BY THE ROOT BALL.
3. GENERAL WORK PROCEDURES A. CONTRACTOR TO UTILIZE WORKMANLIKE INDUSTRY STANDARDS IN PERFORMING ALL LANDSCAPE CONSTRUCTION. THE SITE IS TO BE LEFT IN A CLEAN STATE AT THE END OF EACH WORKDAY. ALL DEBRIS, MATERIALS AND TOOLS SHALL BE PROPERLY STORED, STOCKPILED OR DISPOSED OF.
B. WASTE MATERIALS AND DEBRIS SHALL BE COMPLETELY DISPOSED OF AT THE CONTRACTOR'S EXPENSE. DEBRIS SHALL NOT BE BURIED, INCLUDING ORGANIC MATERIALS, BUT SHALL BE REMOVED COMPLETELY FROM THE SITE.
4. SITE PREPARATIONS A. BEFORE AND DURING PRELIMINARY GRADING AND FINISHED GRADING, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AND DISPOSED OF IN ACCORDANCE WITH GENERAL WORK PROCEDURES OUTLINED HEREIN.
B. ALL EXISTING TREES TO REMAIN SHALL BE PRUNED TO REMOVE ANY DAMAGED BRANCHES. THE ENTIRE LIMB OF ANY DAMAGED BRANCH SHALL BE CUT OFF AT THE BRANCH COLLAR. CONTRACTOR SHALL ENSURE THAT CUTS ARE SMOOTH AND STRAIGHT. ANY EXPOSED ROOTS SHALL BE CUT BACK WITH CLEAN, SHARP TOOLS AND TOPSOIL SHALL BE PLACED AROUND THE REMAINDER OF THE ROOTS. EXISTING TREES SHALL BE MONITORED ON A REGULAR BASIS FOR ADDITIONAL ROOT OR BRANCH DAMAGE AS A RESULT OF CONSTRUCTION. ROOTS SHALL NOT BE LEFT EXPOSED FOR MORE THAN ONE (1) DAY. CONTRACTOR SHALL WATER EXISTING TREES AS NEEDED TO PREVENT SHOCK OR DECLINE.
C. CONTRACTOR SHALL ARRANGE TO HAVE A UTILITY STAKE-OUT TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY LANDSCAPE MATERIAL. UTILITY COMPANIES SHALL BE CONTACTED THREE (3) DAYS PRIOR TO THE BEGINNING OF WORK.
5. TREE PROTECTION A. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING TREES TO REMAIN. A TREE PROTECTION ZONE SHALL BE ESTABLISHED AT THE DRIP LINE OR 15 FEET FROM THE TRUNK OR AT THE LIMIT OF CONSTRUCTION DISTURBANCE, WHICHEVER IS GREATER. LOCAL STANDARDS THAT MAY REQUIRE A MORE STRICT TREE PROTECTION ZONE SHALL BE HONORED.
B. A FORTY-EIGHT INCH (48") HIGH WOODEN SNOW FENCE OR ORANGE COLORED HIGH-DENSITY 'VISI-FENCE', OR APPROVED EQUAL, MOUNTED ON STEEL POSTS SHALL BE PLACED ALONG THE BOUNDARY OF THE TREE PROTECTION ZONE. POSTS SHALL BE LOCATED AT A MAXIMUM OF EIGHT FEET (8') ON CENTER OR AS INDICATED WITHIN THE TREE PROTECTION DETAIL.
C. WHEN THE TREE PROTECTION FENCING HAS BEEN INSTALLED, IT SHALL BE INSPECTED BY THE APPROVING AGENCY PRIOR TO DEMOLITION, GRADING, TREE CLEARING OR ANY OTHER CONSTRUCTION. THE FENCING ALONG THE TREE PROTECTION ZONE SHALL BE REGULARLY INSPECTED BY THE LANDSCAPE CONTRACTOR AND MAINTAINED UNTIL ALL CONSTRUCTION ACTIVITY HAS BEEN COMPLETED.
D. AT NO TIME SHALL MACHINERY, DEBRIS, FALLEN TREES OR OTHER MATERIALS BE PLACED, STOCKPILED OR LEFT STANDING IN THE TREE PROTECTION ZONE.
6. SOIL MODIFICATIONS A. CONTRACTOR SHALL ATTAIN A SOIL TEST FOR ALL AREAS OF THE SITE PRIOR TO CONDUCTING ANY PLANTING. SOIL TESTS SHALL BE PERFORMED BY A CERTIFIED SOIL LABORATORY.
B. LANDSCAPE CONTRACTOR SHALL REPORT ANY SOIL OR DRAINAGE CONDITIONS CONSIDERED DETRIMENTAL TO THE GROWTH OF PLANT MATERIAL. SOIL MODIFICATIONS, AS SPECIFIED HEREIN, MAY NEED TO BE CONDUCTED BY THE LANDSCAPE CONTRACTOR DEPENDING ON SITE CONDITIONS.
C. THE FOLLOWING AMENDMENTS AND QUANTITIES ARE APPROXIMATE AND ARE FOR BIDDING PURPOSES ONLY. COMPOSITION OF AMENDMENTS SHOULD BE REVISED DEPENDING ON THE OUTCOME OF A TOPSOIL ANALYSIS PERFORMED BY A CERTIFIED SOIL LABORATORY. I. TO INCREASE A SANDY SOIL'S ABILITY TO RETAIN WATER AND NUTRIENTS, THOROUGHLY TILL ORGANIC MATTER INTO THE TOP 6-12". USE COMPOSTED BARK, COMPOSTED LEAF MULCH OR PEAT MOSS. ALL PRODUCTS SHOULD BE COMPOSTED TO A DARK COLOR AND BE FREE OF PIECES WITH IDENTIFIABLE LEAF OR WOOD STRUCTURE. AVOID MATERIAL WITH A PH HIGHER THAN 7.5. II. TO INCREASE DRAINAGE, MODIFY HEAVY CLAY OR SILT (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) AND/OR AGRICULTURAL GYPSUM. COARSE SAND MAY BE USED IF ENOUGH IS ADDED TO BRING THE SAND CONTENT TO MORE THAN 60% OF THE TOTAL MIX. SUBSURFACE DRAINAGE LINES MAY NEED TO BE ADDED TO INCREASE DRAINAGE. III. MODIFY EXTREMELY SANDY SOILS (MORE THAN 85%) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX.
7. FINISHED GRADING A. UNLESS OTHERWISE CONTRACTED, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF TOPSOIL AND THE ESTABLISHMENT OF FINE-GRADING WITHIN THE DISTURBANCE AREA OF THE SITE.
B. LANDSCAPE CONTRACTOR SHALL VERIFY THAT SUBGRADE FOR INSTALLATION OF TOPSOIL HAS BEEN ESTABLISHED. THE SUBGRADE OF THE SITE MUST MEET THE FINISHED GRADE LESS THE REQUIRED TOPSOIL THICKNESS (1"±).
C. ALL LAWN AND PLANTING AREAS SHALL BE GRADED TO A SMOOTH, EVEN AND UNIFORM PLANE WITH NO ABRUPT CHANGE OF SURFACE AS DEPICTED WITHIN THIS SET OF CONSTRUCTION PLANS, UNLESS OTHERWISE DIRECTED BY THE PROJECT ENGINEER OR LANDSCAPE ARCHITECT.
D. ALL PLANTING AREAS SHALL BE GRADED AND MAINTAINED TO ALLOW FREE FLOW OF SURFACE WATER IN AND AROUND THE PLANTING BEDS. STANDING WATER SHALL NOT BE PERMITTED IN PLANTING BEDS.
8. TOPSOILING A. CONTRACTOR SHALL PROVIDE A SIX INCH (6") THICK MINIMUM LAYER OF TOPSOIL, OR AS DIRECTED BY THE LOCAL ORDINANCE OR CLIENT, IN ALL PLANTING AND LAWN AREAS. TOPSOIL SHOULD BE SPREAD OVER A PREPARED SURFACE IN A UNIFORM LAYER TO ACHIEVE THE DESIRED COMPACTED THICKNESS.
B. ON-SITE TOPSOIL MAY BE USED TO SUPPLEMENT THE TOTAL AMOUNT REQUIRED. TOPSOIL FROM THE SITE MAY BE REJECTED IF IT HAS NOT BEEN PROPERLY REMOVED, STORED AND PROTECTED PRIOR TO CONSTRUCTION.
C. CONTRACTOR SHALL FURNISH TO THE APPROVING AGENCY AN ANALYSIS OF BOTH IMPORTED AND ON-SITE TOPSOIL TO BE UTILIZED IN ALL PLANTING AREAS. THE PH AND NUTRIENT LEVELS MAY NEED TO BE ADJUSTED THROUGH SOIL MODIFICATIONS AS NEEDED TO ACHIEVE THE REQUIRED LEVELS AS SPECIFIED IN THE MATERIALS SECTION ABOVE.
LANDSCAPE SPECIFICATIONS:
SCALE: N.T.S. DECIDUOUS TREE PLANTING DETAIL
REV.: 2017.01.06
L
S1
SCALE: N.T.S. DECIDUOUS & EVERGREEN SHRUB PLANTING DETAIL
REV.: 2017.01.06
L
S5
SCALE: N.T.S. EVERGREEN TREE PLANTING DETAIL
REV.: 2017.01.06
L
S2
DRAWING LEGEND
PROPERTY LINE RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL
EXISTING STORMWATER PIPE
EXISTING SANITARY SEWER PIPE EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING OPTIC LINE
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING OVERHEAD LINE
PROPOSED CLEAN OUT
RD
PROPOSED SANITARY MANHOLE
PROPOSED STORMWATER PIPE
PROPOSED SANITARY SEWER PIPE
PROPOSED ROOF DRAIN
CO
PROPOSED LIGHT POLE
PHASE LEGEND
PHASE 1A - SUMMER 2018 PHASE 1B - 2018-2019 SCHOOL YEAR PHASE 2A/2B - SUMMER 2019 & 2019-2020 SCHOOL YEAR PHASE 3 - SUMMER 2020
F F F F F F F F F
F
F F
F F
F F F F F F F F
F F F F F
F
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
10
13
4
4
11
9
5 6
REFER TO MEP PLANS FOR EXACT CONNECTION LOCATION TO BUILDING
PROP. 6" PVC SANITARY LATERAL
INV = 398.37
INV = 397.90 INV = 391.78
90 LF 8" PVC @1.90%
PROP. 177 LF 6"
PVC @ 1%
202 LF 8" PVC @1.90%
CONNECT TO EXISTING 6" PVC
PROP. 8" ROOF DRAIN
INV = 394.95
INV = 391.11
F
F
PROP. CONNECTION TO EXISTING 12" WATER MAIN
PROP. 6' X 9'
METER PIT
WITH FDC
PROP. 6" DIP FIRE SERVICE
41.7'± (REFER TO PLUMBING PLANS
FOR EXACT LOCATION OF
NEW SANITARY LATERAL)
PROP. CROSSING BOTTOM SANITARY = 396.90 TOP STORM = 392.25 CLEARANCE = 4.65'
PROP. CONNECTION INV = 390.07 ± (CALC'D; NOT FIELD VERIFIED)
PROPOSED 2-STORY BUILDING ADDITION
(22,792 SF TOTAL)
PROPOSED 1-STORY BUILDING ADDITION
(2,221 S.F.)
PROP. FIRE HYDRANT
404.50
10'
404.50
402.50
405.00
FF=405.16
405.16
FF=406.69
FF=399.54
402
404
RD INV = 392.65
PROP. 8" ROOF DRAIN
INV = 393.45 PROP. CROSSING BOT. SAN.= 394.73 TOP STORM= 393.76
CLEARANCE= 0.97'
40 LF 8" PVC @2.00%
PROP. CROSSING BOT. STORM= 394.66 TOP SAN.= 391.16 CLEARANCE= 3.50'
EXISTING SANITARY LATERAL TO BE
PLUGGED AND
CAPPED
402
403
405
404
TEMPORARY CONSTRUCTION LAYDOWN
/ STAGING AREA
PROP. TEMPORARY
ACCESS TO CONSTRUCTION
STAGING AREA
PROP. 15 LF 6" PVC ROOFDRAIN @2.00%
INV = 398.36
ENTIRE STONED STAGE AREA TO BE
RESTORED FROM
COMPACTION (REFER TO SOIL
COMPACTION RESTORATION SPECIFICATIONS)
PROP. FDC AND "FIRE DEPARTMENT CONNECTION" SIGN
F F F F F F F F
PROP. 4" DIP FIRE SERVICE
CONTRACTOR TO INSTALL PROP. WATER LINE TO AVOID EXISTING
PLAY STRUCTURES TO THE GREATEST EXTENT POSSIBLE
RD
INV = 398.06
EXTEND EXISTING ROOF DRAIN PIPING UNDERGROUND AND CONNECT TO EXISTING INLET
PROP. 6" PVC ROOFDRAIN @2.00% (MIN.)
INV = 401.50
ADJUST/RAISE MANHOLE RIM ELEVATION TO GRADE
RD
OH OH OH
OH OH OH OH OH
OH OH OH OH
PROP. TEMPORARY UTILITY POLE (REFER TO ELECTRICAL
PLAN FOR DETAILS)
CO
F
PROP. PIV - REFER TO DETAIL. PROVIDE
PROP. CONC. BOLLARDS FOR PROTECTION (4)
F F F F F F F F
F F F
PROP. CONC. BOLLARDS (PROVIDE
3' MIN. CLEARANCE)
ADJUST INLET GRATE ELEVATION TO BE ON GRADE=404.25±
403
404
405
402 401
PROP. 6" DIP FIRE SERVICE
UTILITIES:
UTILITY COMPANY PHONE NUMBER
THE FOLLOWING COMPANIES WERE NOTIFIED BY PENNSYLVANIA ONE-CALL SYSTEM (1-800-242-1776) AND REQUESTED TO MARK OUT UNDERGROUND FACILITIES AFFECTING AND SERVICING THIS SITE. THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED UPON THE UTILITY COMPANIES RESPONSE TO THIS REQUEST. SERIAL NUMBER: 20163131545
AQUA PENNSYLVANIA, INC.
AT & T COMCAST CABLE COMMUNICATIONS, INC.
COMCAST CABLEVISION EAST GOSHEN TOWNSHIP
INTERSTATE ENERGY
PECO SUNOCO PIPELINE TRANS CONTINENTAL GAS PIPE CORP.
VERIZON
610-525-1400 215-233-3474 215-918-3137 215-961-3800 610-692-7171 610-933-4300 610-292-8057 215-669-3232 610-644-7373 800-479-1919
STATUS
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
COMMENTS
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
6 PROP. TEMPORARY STRIPING TEMPORARY RELOCATION OF ADA PARKING
8' 8' 8'
TEMPORARY RELOCATION OF ADA PARKING SIGNS
29.3'
1. INSTALL CONSTRUCTION LAYDOWN AREA AND PERIMETER FENCING.
2. INSTALL WATER METER PIT AND NEW FIRE SERVICE LINE AT CHESTER ROAD.
3. INSTALL NEW FIRE HYDRANT AND FDC AT REAR OF SCHOOL; INCLUDING NEW 4" FIRE SERVICE FROM SCHOOL TO FDC.
4. INSTALL NEW 6" SANITARY LATERAL.
5. DEMOLISH PORTION OF EXISTING BUILDING.
PHASE 1A
1.
PHASE 1B
PHASE 2A & 2B
PHASE 3
1. CONSTRUCT 2-STORY BUILDING ADDITION.
2. INSTALL NEW ROOF DRAINS FOR 2-STORY BUILDING ADDITION AND TIE INTO EXISTING STORM SEWER LINE.
3. INSTALL NEW 8" PVC CONNECTION TO EXISTING ROOF DRAIN.
1. DEMOLISH EXISTING MODULAR BUILDING IN COURTYARD.
2. COMPLETE ROUGH GRADING AND WORK WITHIN COURTYARD.
3. CONSTRUCT 1-STORY BUILDING ADDITION AND ASSOCIATED GRADING AND ROOF DRAIN CONNECTION. REFER TO STRUCTURAL PLANS AND ARCHITECTURAL PLANS FOR FOUNDATION CONSTRUCTION AROUND EXISTING STORM SEWER.
1. CONSTRUCT 1 NEW PARKING SPACE AS SHOWN.
2. INSTALL PARKING AREA STRIPING AND SIGNAGE AS SHOWN.
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-2\PC161321BASE-2----->LAYOUT: 06-PHASING PLAN CF
1600 MANOR DRIVE, SUITE 200 CHALFONT, PENNSYLVANIA 18914
Phone: (215) 996-9100 Fax: (215) 996-9102 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
7
REVISION 2 - 2018.01.05
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-2
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017,2018 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1 11/28/17 REVISED PER UPDATED BUILDING FOOTPRINT
ENP/ MAM
2 01/05/18 REVISED PER CLIENT COMMENT
ENP/ MAM
1"=30'
PHASING
PLAN
6
TEMPORARY STRIPING CONDITION
r I
(
I
(
PIPE SUPPORT
/ ~
"' @
/'
" /'
These pipe supports ore mode up of the following materials: Tho so:Jdle is cut to size from tle<"'Y plate steel and fo r9ed lo shape. The suppor ting column is steel pipe - see tables (
below and ANSI 1 25 pound companion fto nge forms the base.
For the adjustable support, the shank Is solid steel rod, threaded.
The pipe support is odj.Jstob1e by means of o heavy steel nut mounl•d on o reinforced malleable iron cop eovaring tho lop of the support column.
NOT£: Flanged pipA ~ u pports '"" nc1'1!ptn hle.
ADJUSTA8LE PIPE SUPPORT
ANCHOR & BLOCKING DETAILS
SCUD FLANGES
RE OU IRED
BLDG. FLOOR
RETA.JNING Cl.ANO
{T'r'P.)
J"• J"• 3/8" REACTION ANGLE IRON
C~CRETE
BLOCKING
POORED AGAINST UNDISTURBED
""''"
OR J" ~ 2' RECTANOUU>n STf!UCTURll.L TUB£
MINIMUM Of (2) BOOS PER Fl.O.NGE REO'D. ROD DIAMETER TO EQUAL SOLT SIZE OIAMETER.
~OU' RESTRAINT (Sff DETAIL)
TIE RODS ""d SOLID FLANGES
REQUIRED
. . ..
..
TIE ROCS ond SOUD FLANGES
REOUIREO ,,...,
( METER PIT DOOR DETAILS
ACCESS TO PIT {OPTION #1)
GRASS ..... .. ·· SLOPE /I.WAT ••
FROI.! PIT
SIZE DETEru.ifN!:O !JY
OOOR SELECTION
ACCESS TO PIT (OPTION Q2)
SIZE OETERNINED BY DOOR SELECTION (lrP)
...
TOP Sl.A8
~ ACAOAM
#5 BARS 0 4• oc
SlANOARO INSTALLATION
~ERE TOP SLA9 AtlD ACCESS DOOR ARE
f'LIJSN Wlitt GRASS M!E.A OR DRIVEWAY
SEE ACCESS DOOR
SD.ECTION NOTES
1/2" CONC SEALANl Length of threaded shanks will allow up to 6 inches for odj.Jstment ""' RESTRAINT
6'~1 ==_f~=~i:: .. ,~, ..I,,. ""'- -- Size o f Plee to be Oimentions of Materials Used Size o f Supporting Pipe 5<J or led lnChes
Height (SEE DETAIL) / ' Sod die honk fnche~ Flange 00 Inches Size lmin Length 00 Inches 3 3.96 3 8 x 2 3 4 ROD a 7 1/2 '
... 80 J 8 x 2 J 4 ROD 8 ' 6 6.90 3 8 x 2 3 4 ROO a " a 9.05 I 2 X 2 3 4 ROD a 13 112
0 " Inches Inches 2 Std 20 2 Std 20 2 Std 20 2 Std 20
. : . . •; , BLDG. FLOOR • .
MJ OIANl-Sl.EEVE (or equal) .....,Tll MEGALUG
.. ~ ~
OR Crode odjtJ~ tm en l
if necessary
,,
ELEVATION 10 11.10 I 2 X 2 3 4 ROD a 16 2 Std 20
AOJ. PIPE
SUPPORT 15 BARS 0 4• oc BUILD-UP SLAB
Wotta n4 OCDA
"p Standard
LP Std. wlFDC
HP Standard
HP Std. w/FDC
"0"' LP
"0" HP
AQUA
Pipe Support Det ail
rev. 06-07- 13 ck'd byo MJF I Pion No.
AQU A
P-2 RESTRAINT f!lf! METER PIT Anchor & Blockfr'19 Detoils
4-14 BARS It CORNERS
PLAN VIEW BUILD-UP SLAB
AQUA
,O.ci;eM Doer Oetcll
Single Service PIT Calcula tions - FI RE
SINGLE SERVICE PIT DIMENSIONS
for FIRE Service
Fitlin
lnlel Flaioe vai.ia
~w Tail Pc wl• Baci<flow Inc: valve• °"""' Flan"" Gaskell; TOTAL. linl TOTAL lft FINAL 111 mln "e><tra" incrie..
TOTAL. fin TOTAL.ml FINAL <ff• min "1!xtra" lic11es
Gaske!S
TOTAl..(ftl FINAL<ftlmin
TOTAL in
TAI.. f" FINAL lftl min "eidr<i" bet.es
OPEN SYSTEM CLOSED SYSTEM S" 8" 10'" 4" 6" 8" 10- • ' ' ' . ' ' ,., 11.5 " -.:~ :m :>M, t:i:~ •• "
M ~N,\·~~2: " " " " " " " "' "
;;; '" "' "
;; ; • ' ' • ' • ' o; '' "'
0.25 0.25 0.25 ·~ 135.5 148.0 168.0 71.3 79B B3.3 ~· 11.3 ,,, 14.0 .... .. •• '·' "
,:;, '.14 ;) ,8 . . ,o_'f\>" • ,:-, . . y,)';"i . - "ii"•:<:.·. "'
O.D D.D "" .... "·" '·'
16 18 22 13 " " 0.25 0.25 0.25 0,25 0.25 0.25 0.25 15!.8 166.3 190.3 84.5 ge.o 101 .5 109.0 \ 2.6 13.9 15.9 7.0 8.5 9.1 " •• 1.8 1.8 ·0.5 o.o 6.5 ·1.0
18 25 0.25 11.25 0.25 0.25 0.25 0.25 0.25
, ~ ~ . a 113.3 100.3 93.5 1oa.s 120.0 130.o 12.8 14.4 16.5 7.8 9.0 10.0 10.8
2.3 ti.II 5.ll 2.5 ·0.5· - 0.0 2.0
16 18 22 13 16 18 22 0.25 0.25 0.25 025 0 15 0.25 0.25 170.0 191.5 220.5 11)6.8 124.8 1lll.3 152.3 14.2 18.0 184 6.S 10.4 11 . ~ 12.7 I "- .14'»" ·: A6 :i.i'; .-;'i1t 0 : : • • ~;fs~:. _ ... ff•~ ,,:"'::12{\t; i£¥f"3 . :~ -2.0 0.5 7.5 1.3 7.3 5.8 3.8
Front of Dt>m nin iu' 19 .~ 20.5~9 9 99
Eront.QJ. nin . ft 1~ Front of Ooor nln ft . 1
Fron! of Door Front of Door Front of Door
nin in\ nin ft enin ft
31 5 '' ' .
8 08 0.8 0.8 0.8
45.5 52 3.8 4.3 .J . ' •! \ 4 " 1 • ,_ .. , 0
28.5 36.5 43 3 0 3.6
(,.. .. TOP VIEW
' ' ,. ' <~ ' . ' .. ' El
Outlet
::;i ,:::-,.. Sump hole
I ·•· I.:
• :.;;:::..:<;·• .• .......
~- ' ' > ' ' ' . ~ , .. ACCESS " .. OOOR I." ""./' j_ ' . ' k Alum ladder
¥.: ' :· I.,>, ..
.;';, w/safety post " '." ... .
"L"'
;; :;·~~. ,.,. .. ... :·., ,, ,,:
"D" :J;· . 'fi! Inlet ''.·'.·
-·~': .,, '·'' ; i '}. " ';; ·' '
,.._ ___ "W" = 6 ft. --~-I
Dim Description L Length - Low Pressure (LP) L Length - Low Pressure w/ FDC L length - Hiah Pressure (HP) L Length - High Pressure wt FDC w \'\Id~ H Heic::iht B Centerline of pipe to side wall 0 • Front of Door Opening to Inlet \r\lall - LP 0 • Front of Door Opening to Inlet Walt- HP Centerline of pipe to floor Backftow allowance (inc.both vaM:!s) A Heiaht of raised Access Door Access Door Opening
' Assumes inlet 8<1nge is 9 in. from inlet Willi.
FRONT VIEW
Access Door T'A'
"B" "B" "'H"
20 in.
.._. 3 fl. J fl. ti' 6" min.
l '•'\ l:;;i.-----1----~>l ·j~ 7' max . '1
"!!!
I> ~s::;:;;:::;;s;::=~~'I L:..:...:.. ,., '•<' ~c,, , .. .<;,. ,,,..·., '
~--- 'W" = 6 ft. --~><
Refer ro Plan DS-1 for additicnal nc1es.
"OnenS tern" "Closed S tern" 6" ... 10" ' "3" 4" 6" ... 10" 12' 13' (4' Wa 6' 7' 7' 8' 13' 14' 16' V~rVa , 7' 8' 9' 9' 13' 15' 17' <;n'a: 8' 9' 10' 11 ' 14 16 (9' iY'! 9' 11' 12' 13' 6 ft. 6 ft 7 ft. 7 ft 3 ft. 3 ft 1' 1 · I 1' ' n'a ·I 1· 2' 2' 2' 3' I 3' I 4' ·~a J 2' I 3' 3' 3'
20" min· 24" max 20" min. to 24" max. 49" I 53" I 56" !)'a l 40" I 49" I 53" I 56"
6" min to 12" max 6" min. to 12" max. 4' x4' 4' x 4'
Pit dimensions <1re indide dimensions.
a•
FlRE SERVICE LlNES - 6", 8", and 10"
"Open Sysle1n" h as fi r e hydr ants, 1n eler pit i:; req'd
Non- R&Sidenl~I - ~ow PRESSURE - HIGH PRESSURE (up le 150 ps;) (,,here p<es,.,re moy e><:eod 150 p,,;)
S.• note below.
RPZA for systems with chemical additives (anti- freeze S)l5lerns) DCVA for systems with no chemical odditi~es
®0 I.) 16'171 FIRk"'DEPT~TIOO ON TOP OF
PIT (ff STORZ INLET).
Only "·'"" req'd by fire Dept.
RPZA bockflow devices ore not l'.......,ill•d in pi t~ .
CHECKVALVEWIBAU. DRIP
' Rtfer to Pl.AN No. f-4 Jor pit dlM.,,..._
L• -------- < ~DRAINAGE PIT FOR ORAN
FROM CHECK VALVE (13" CRUSHED STONE) .. • 2 R.S. Cate Volve, O.S.l!Y., Fla"9.ii ,.
J Pruaure R-chg Vol•• (PRV) SfZEO BY CUSTOM~ 4 Mot.,. (by Aquo) 45- SJ" 118" S Badnow 0.-1<:<1 A11ombly - OCOA a< RPOA ,.
6 Spool PMK:e, fig x Fig - l ongth - 12 In. (m.,.) ,. ,, fora St~• FFCA or Smmi-!Jolr St)l<I ~1J e Teo for roe, only 1r req'd by locol r110 O<ipt. o• e" to"
G•ancNln• ••••• by '"""' ......, Oopo,tmont If ' """'""· SIZEO GY l.OOAL FIRE 0CPAR1MENT
A. It le the CUSTO.llER's reeponslbilty to oddress THERMllL EXPANSION bef0<e \he lnotollotion of o PRV or bockHow de•ice. All Fire systems shO\Jld hove o Preosure Relief Volve.
8. Wat.,,- Company Rules & Re9ulations require that ell of the spedficotions ore met ond o meter is sel bofore water ser;lce i• turned on.
C. It I• tne CUSTOMER'• re!!ponslllllity to srze the pressure redudn9 volve(s) to nt meir now reeds. Two-stage reduction may be needed .-here there is o wide voria\ion between the initiol pressure and the reduted prossure. Paralh•I lnstollotian may be needed wh•r" there is o wide voriction of reduced pre•9'Jr& requir-enls. wh"'e it is vilof le mo'ntoin o continuous wcler supply, or <>the< reo90ns for improved P"'fo•monce.
0. Eoch port must be NSF /ANSI 61 (Annex f" & C) compliont. Outlet fl<1nge must be 9 in. {min.) from outlet wall. Entire unit mu•t be NSf"/A.NSI 372 complicnl. AQUA
NOTES:
l\OUA Single Service Pit G81culations- FI RE Ck'd b~ MJF I 31612014 I Plan No. "'
Pipe restra ined with Omni Sleeve in each end of pit 1Nall.
MAINTAIN STOCK PILESl.ff"ACE IN ACCORDANCE WITH TEMPORARY STABILIZATION NOTES
3:1 MAX. SIDE SLOPES
-------- CONSTRUCT SILT FENCEAROLtlD ------
DOWNHLL SIDE OF STOCKPILE
TEMPORARY SOIL STOCKPILE DETAIL SCALE: N.T.S. REV.: 2015.03.09
FABRIC
CUTAWAY VIE~
SLl'PORT STAKE•
UNDISTURBED
GROUND
srml
---~l!h_-<~STAPLES
JOINING FENCE SECTIONS
REINFORCING MESH EITHER INDUSTRIAL POL YPROPOLEt\E OR STEEL MESH WITH 6 IN. MAX. OPENING STEEL MESH SHALL BE 14 GA. MIN.
'
61N.
MIN. 13.5 GA. WlRE
TOE ANCHOR TRENCH • STAKES SPACED AT 8 FT. fN\X. USE 2 IN X 2 IN X 48 IN. (:tMI N.) WOOD OR EQUIVALENT STEEL (U OR 1) STAKES
\ , FILL SLOPE
ELEVATION VIEW
FABRIC SHALL HAVE THE MINl~UM PROPERTIES AS SHOWN IN TABLE4.30FTHE PA DEP EROSION CONTROL MANUAL.
FABRIC WIDTH SHALL BE 42 IN. MINIMLJM. STAKES SHALL BE HARDWOOD OR EQUIVALEITT"STEEL (U OR 1) STAKES.AN 18 IN. Sl.FPORT STAKESHALl BE DRIVEN 12 IN. MINIMUM INTO UNDISTI.RBED GROU~.
SILT FENCE SHALL BE PLACED AT LEVEL EXISTING GRADE. BOTH ENDS OF THE FeCE SIW.L BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MA.IN FENCE ALIGNMENT.
SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH HALF THEABaVE GRO~D HEIGHT OF TIE FENCE.
AtfY SECTION OF SILT FENCE WHICH HAS BEEN UNDERMINED OR TOPPED SHALL BE IMMEDIATELY REPLACED WITH A ROCK FILTER Olffi.ET (STANJARD CONSTRUCTION DETAIL# 4-6).
FENCE SHALL BE REMOVED AND PROPERLY DISPOSED OF WHEN TRIBUTARY AREA IS PERW.NENTI. Y STABILl2ED.
STANDARD CONSTRUCTION DETAIL #4-8
REINFORCED SILT FENCE (30" HIGH)
NOTTO SCALE
rev. 3-18-14
AQUA
(. OCDA & RPOA A99embli81 must be UL & Fl.I ~pro>ed. 'Open' Fire Lines 6" le 10"
SINGLE SERVICE DIMENSIONS (Fire) ' '' •• ~ I ~·
Ck'd by: M>F IPlan No. F-4
SOIL COMPACTION RESTORATION SPECIFICATIONS
DESIGN CONSIDERATIONS
1.) COMPOST SHOULD BE ADDED AT A RATE OF 2:1 (SOIL: COMPOST). IF A PROPRIETARY PRODUCT IS USED, THE MANUFACTURER'S INSTRUCTIONS SHOULD BE FOLLOWED IN lERMS OF MIXING AND APPLICATION RAlE.
2.)SOIL RESTORATION SHOULD NOT TAKE PLACE WITHIN THE DRIP LINE OF A TREE TO AVOID DAMAGING THE ROOT SYSTEM.
3.) PROCEDURE: ROTOTILL, OR RIP THE SUBGRADE, REMOVE ROCKS, DISTRIBUTE THE COMPOST, SPREAD THE NUTRIENTS, ROTOTILL AGAIN.
4.)ADD 2-3 INCHES COMPOST I AMENDMENT AND TILL TO A MINIMUM DEPTH OF& INCHES.
COMPOST MATERIALS
1.) COMPOST PRODUCTS SPECIFIED FOR USE IN THIS APPLICATION ARE DESCRIBED IN THE TABLE 1.
2.) ONLY COMPOST PRODUCTS THAT MEET ALL APPLICABLE STATE AND FEDERAL REGULATIONS PERTAINING TO ITS PRODUCTION AND DISTRIBlfTION MAY BE USED IN THIS APPLICATION APPROVED COMPOST PRODUCTS MUST MEET RELATED STATE AND FEDERAL CHEMICAL CONTAMINANT (e.g., HEAVY METALS PESTICIDES, etc.) AND PATHOGEN LIMIT STANDARDS PERTAINING TO THE FEEDSTOCKS (SOURCE MATERIALS) IN WHICH IT IS DERIVED.
3.) VERY COARSE COMPOST SHOULD BE AVOIDED FOR SOIL AMENDMENT AS IT WILL MAKE PLANTING AND CROP ESTABLISHMENT MORE DIFFICULT.
4.) NOTE - SPECIFYING THE USE OF COMPOST PRODUCTS THAT ARE CERTIFIED BY THE U.S. COMPOSTING COUNCIL'S SEAL OF TESTING (STA) PROGR.ONI (www.corrpostingcouncil.org) WILL AL.LOW FOR THE ACQUISITION OF PRODUCTS THAT ARE ANAL VZED ON A ROUTINE BASIS, USING THE SPECIFIED TEST METHODS. STA PARTICIPANTS ARE ALSO REQUIRED TO PROVIDE A STANDARD PRODUCT LABEL TO ALL CUSTOMERS, ALLOWING EASY COMPARISON TO OTHER PRODUCTS.
COMPOST APPLICATION PROCEDURE
1.) THE ENTIRE AREA TO BE AMENDED SHOULD BE RIPPED TO LOOSEN SOILS. THE SURFACE SHOULD THEN BE CLEARED OF CLODS, ROCKS AND DEBRIS GREATER THAN 2" IN DIAMETER THE SOIL SURFACE Srw.L BE REASONABLY FREE OF LARGE CLODS, ROOTS, STONES GREATER THAN 2 INCHES,AND OTHER MATERIAL WHICH WILL INTERFERE WITH THEAMENDMENT PROCESS, PLANTING AND SUBSEQUENT SITE MAINTENANCE.
2.) RIPPING, SUBSOILING, OR SCARIFICATION OF THE SUBSOIL SHOULD BE PERFORMED WHERE SUBSOIL HAS BECOME COMPACTED BY EQUIPMENT OPERATION, DRIED OUT AND CRUSTED, OR WHERE NECESSARY TO OBLITERAlE EROSION RILLS.
3.) RIPPING (SUBSOILING) SHOULD BE PERFORMED USING A SOLID-SHANK RIPPER AND TO A DEPTH OF20 INCHES, (8 INCHES FOR MINOR COMPACTION)
4.) DISTRIBUTE COMPOST EVENLY TO A DEPTH OF 2-3" INCHES OVER THE ENTIRE SOIL SURFACE. TILL TO A DEPTH OF 8" IN TWO CROSSING DIRECTIONS. FOR SMALL AREAS, COMPOST MAY BE SPREAD BY HAND WITH A SHOVEL AND RAKED EVENLY OVER THE SOIL. FOR LARGER AREAS, USE A TRACTOR-MOUNTED SPREADER OR OTHER SIMILAR DEVICE.
5.) SPREAD LIME AND NUTRIENTS AS INDICATED BY SOIL TESTING.
6.) WATER THOROUGHLY. ALLOW SOIL TO SE TILE FOR ONE WEEK. IF COMPOST IS IMMATURE, EXTEND SETTLING PERIOD TO 1WO TO FIVE WEEKS.
7.) FINE GRADEAND HAND ROU.AS NECESSARY TO ACHIEVE AN EVEN FINAL GRADE TABLE I. PHYSICAL REQUIREMENTS FOR COMPOST
PARAMETER RANGE TESTING METHOD
pH 5.0-8.5 TMECC 4.11A
SOLUBLf SALT CONCENTRATION < 10dS/m TMECC 4.10-A
MOISTURE 30-60% WET WEIGHT BASIS S~E'NW 2540B
ORG/'NIC MATTER J0-65:.11; DRY WEIGHT BASIS TMECC 5.07-A
PAROCLE SIZE 98% PASS TilROUGH 3/4" SCREEN OR SMALLfR TMECC 5.07-A
STABLITY > 80% RElATIVE TO POSITIVE CONTROL TMECC 5.08-B
(CARBON DIOXIDE EVOLlJTION RATE)
lrlATU~ITY > 80% RElATIVE TO POSITIVE CONTROL TMECC 5.05-A (SEED EMERGENCE mo SEEDING VIGOR)
PHYSICAL CONTAMINANTS < 1% DRY WEIGHT BASIS TMECC J.08-A (MAN MADE INERTS)
CHEMICAL CCNTAMINANTS '"••• vn ~w••" YY ••" YY~Y II v""'"'"'"' Y'" OY"v,l.J, "'"~~ I •••Y .J -------------- J..EliE~-------------- ------------- ARSENIC < 41 PPM TMECC 4.06-AS
CWMIUM < 39 PPIA TMECC 4.06-CD
COPPER < 1,500 PPM TMECC 4.05-CU
lfAD < 300 PPM TMECC 4.06-PB
f.ERCURY < 17 PPM TMECC 4.06-HG
f.()LYBDENUM < 75 PPM TMECC 4.05-1.10
NICKEL < 420 PPM TMECC 4.06-NI
SEl£NIUM < 100 PPM TMEGC 4.06-SE . . . ' . ' .. ' .. " ' .. '''''''''"' ''"''''''' "' ' . ' " ' .. " . ' . ' ' . ' ZINC < 2,800 PPM TMECC 4.06-ZN
BIOLOGICAL. CONTAMINANTS MEET OR EXCEED US EPA CLASS A ST/INDARD, 40 CFR §503.32(a) LE\IELS: (PATHOGENS) --------------
· -:~::~M;;/4~G!:~ci!-:~~:t:i~·t~:~6I·~~I-~-~~~.~~~.~- FECAL COLIFORM
S~LMONELLA
ALUldlNUM L4ANHOLE
STEPS
FREE-STANDl~G FIRE
DEPT. CONNECTION (5" STORZ INLET TO
MATCH LOCAL FIRE
DEPT. PROVIDE PROPER SIGNAGE.
L _J
TOP VIEW
D
•
PRECAST COOCRETE
VALVE I/AULT 2'-0" INSIDE DIAMETER
LOCMBLE ALUMINU~I ACCESS HATI:H
• ,. . .
PIPE SUPPORT . ,.
24•
,.
HECK l/ALVE
11'/BALL DRIP
!lfjj$\-,CRUSHEO STONE
8" CRUSHED 2A
STONE BASE
FIRE DEP ARTME:ST CONNECTION IPIT DETAIL
NO SCALE
OCKING STAPLE
CENTER BARREL-~,
STEM ADJUSTABLE POST
LOWER BARREL:
GATE VALVE
OPERATING WRENCH
GRADE
z "
,,,.---~~,...)~=~Wi---~/,[__6',PROlICTION MAIN
NOTES:
TYPICAL SECTION
KENNEDY OR APPROVED EQUAL POST INDICATOR VALVE
NO SCALE
CONCRffi TO BE lmSED FOR
PROPER WATER RUN OFF -~
4' DIAMCTER STEEL PIPE FILLED w/ CONCRETE PAINTED TRAFFIC
YFl I OW ANO FMAFDIJFD IN ---~
CONCR:TE BASE
BITUMINOUS JOINT AROUND PIPE
Ta' OF SLAB OR ASPHALT
1.) BOUAROS REQ'D A" BLDG. CORNERS. FIRE flYDRANTS, WATER METER, GAS METER, SPRINKL::R RISER, SHOWN TRANSFORMER & Af.L lJTILITIES AT LOCAllONS SHOWN ON THESE DRAWINGS INTERIOR & EXTERIOR.
2.) BOLlARDS SHALL BE PAINTED TRAFFIC "ELLOW ANO MUST BE PERPEIUALlY
MAINTAINED / REPAINTED BY PROPERTY OWNER OR PARTY RESPONSIBLE FOR SITE MAINTENANCE.
CLASS A CONCRETE IAIN. CO!t1PRESSVE STRENGTH 4,000 PSI 0 28 DAYS
REV.: 2015.03.09
lASLE 11.2 Soil Amendment Applictttion Rate Equivalents
~ a rman e nt Seedinr:r A lication Rate So il Amendment Per Acre Per 1,000 sa. ft. Per 1,0 00 sa. vd. Notes Or as per soil
Agricultural lime 6 tons 240 lb. test may not be 2.4 80 lb. required in agricullurttl fi elds
Or as per soil test: may not be 1D-10-20 fertilizer 1.000 lb. 25 lb. 21 0 lb. requ ired in agrlculturttl fields Temporttry Seeding Applictttion Rate
Agricultural lime 1 ton 40 lb . Typically not 41 0 lb. required for topsoil stockpiles
10-10-10 fertilizer 500 lb. 12.5 lb. Typically not 100 lb. required for topsoil stockpiles ' Adapted from Penn State, Eros10n Control and Crnservat1on Plantings on N oncropland~
NOTE: A compost blanket which meets the standards of this chapter may be su bst ituted for th e
soil amendments show 11 in Table 11.2.
TABLE 11.6 Mulch Application R:ates
Applittttion Rate (Min.)
Mulch Type Per Acre Per 1,000 sq. ft Per 1,DOO sq. yd Notes
Straw 3 tons 140 l::i "1;240 lb. E ~her wheat or oat straw, free of weeds, not chopped or finely broken
Hay 3 tons "140 l::i. "1,240 lb. Timothy. mixed c1o·ver and timothy or other native forage grasses Wood Chips 4 -6 tons "185 - 275 lb. ·J ,650 - Z,500 lb. May prevent germination of grasses and legunie:s Hydron1ulch 1 !0 11 47 lb. 41'.J See lin1i'ations above
4,000 P.S.I. CONC. COUAR
TOP SECllON VALVE
BOX (CAST IRON)
PIPE SIZE &: CLA5S ~ REQ'D PER UllUIY PLAN
ELBOW
WYE
AJPROVE) BEDDNGV
MATERIAL (SEE DETML)
TYPICAL CLEANOUT DETAIL
@?'c!~~AREAS)
9.JPERPAVE ASPHALT ~ICTURE OESIGN, HMA WEARlt-lJ COURSE, PG. 64-22, J.0-10.0 MILLION
ESALS, 12.5 Mii MIX, 1.5" DEPTH, SRL-H --..._
9.JPERPAVE ASPHALT MICTURE DESIGN, Hlr1A
REV.: 2015.03.09
BINDER COURSE, PG. 64-22, 3.0-10.0 MILLION---:;~~~~~~~~ ES/\LS, 19M~ ~IX, 2.5" DEPTl-1
6" 'lA PAllUI SIUNI:.
SUOOASE
FIRM, UNYEILDING SUBGRADE
CBR VALUE ~ 5.0
STANDARD ASPHALT PAVEMENT DETAIL
FILTREXX NOTES:
SCALE: N.T.S.
6"-8" RED SHA_E STONE
EED BARRIER FA[l{IC
CONSTRUCTION STAGING AREA DETAIL
N.T.S
WIDTH VARIES - SEE PLAN
r
4" THICK, ClASS 'M' CONCRETE (3,500 PSI @ 28 DAYS) I {
4" THICK, COMPACTEC
STONE BASE (TYPE 2A)
. ~ './. ' 111-1'' ,. U. 1111 ..
'1.'11 . ''"-111~11
1111
EXPANSION JOINTS 1/2" WIDE PREl.10ULDED arr. MATERIAL SHALL 3E INSTALLED AT 30' INTERVALS. CONTR~TION JOINTS TO BE SPACED AT
EQUAL INTERVALS, 5' MAXIMUM LENGTH.
CONCRETE SIDEWALK DETAIL
REV.: 2015.03.09
SCALE: N.T.S. REV.: 2015.03.09
1-1/?' lll-?A RITlJ~INOUS
WEARING COURSE
4" 2A MODIFIED STONE SUBBASE
ASPHALT WALKWAY DETAIL SCALE: N.T.S.
COWOSTFILTERSOCK
BLOViW/PLACED
FILTER '1£DIA.
'-·
"
..__
..__
SECTION
--- ---
2 IN. x 2 IN. WOOOEN STAKES PLACED 10 FT ON CENTER
UNDISTLJRBEDAREA
--- " -
"
• SOCK MATERIAL SHALL MEET THE STANDARDS OF PA DEP EROSION CONTROL MAft.W. TABLE 4.1. COWOST SHALl r.EET THE STANDARDS OF PA DEP EROSION CONTROL MAtt.JAL TABLE42 • COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHAU. BE EXTE~ED AT LEAST EIGHT(S) FEET UP SLOPE AT 45° TO THE MAIN SOCKALIGNr.ENT(PA DEP EROSION CONTROL MAflJAL FIGLRE4.1). MAXIWM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT SHQIMl ON PA DEP EROSION CONTROL MANUAL FIGURE 4.2. STAKES MAY BE INSTALLED IMEEDIATELY DOWNSLOPE OF TlESOCK IF SO SPECIFIED BYTlE IMNUFAC"Trnm. • TRAFFIC SHALL NOT BE PERMITIED TO CROSS FILTER SOCKS. • ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF TIE ABOVE ~D HEIGlfT OF T1£ soa< AND DISPOSED IN THE MANNER DESCRIBED ELSEWl-IRE IN TIE PLAN. • SOCKS SHALL BE INSTPEDTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAW.GED SOCKS SHALL BE REPAIRED ACCORDING TO MANJFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOIR3 OF INSPECTION. • BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER SIX (6) t.OITHS, PHOTOOEGRADABLE SOCKS AFTER Ot\E (1) YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MAflJF~ RECOw.£NDATIONS. • UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKESSHALlBE REMOVED. nE SOCK MAYBE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATIER CASE, THE MESH SHALL BE CLIT OPEN AND T1£ WLCH SPIEAD ABA SOILSllPPLE'm"ANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
NOTTO SCALE
\
SUPERPAVE A.SPHALT l.11XTURE DESIGN, HMA WEARING COURSE, PG. 64-22, J.0-10.0 MILLJON
ESALS, 12.5 IAM MIX, 1.5" CEPTH, SRL-H OR TO A DEP"IB EXISTING*
SUPERPAVE ASPHALT MXTIJRE DESIGN, HMA BINDER COURSE, PG. 64-22, 3.0-10.0 MllllON ESALS, 19MM IAIX, 2.5' DEPTH OR TO A DEPTH EXISTING'
SUPERPAVE ASPHALT MIXTURE DESIGN, HMA B\SE COURSE, PG 64-22, 3.0-10.0 MIWON ESALS, 25.0 Mii MIX, 5° DEPTI-1 OR TO A DEPTH EXISTING*
2A UNLESS COURSE AGGREGATE MATERIAL IS SPECIFIED IN PERMIT.
0
*(WHICHEVER IS GREATER)
\ /' ..r-SAW ClJT
l'-o· j
'(WHICHEVER IS GREATER)
1. EXPOSED VERTICAL ANO HORIZONTAL SURFACES SHALL BE PREPAflED PS PER PADOT PUB. 408,
SECT. 409.3(g)
FLEXIBLE PAVEMENT RESTORATION SCALE: N.T.S.
!W;l£0C CAUTON TAPE
WATER MAIN---
. ,,
2' + O.D.
REV.: 2015.03.09
AVEl.IENT CR GRADE
~--!---BACK lLL wtTH SUITABLE EXCAVATED
MATERAL• OR SELECT GRANULAR BACK I
FILL AS F'ER ~UNICIPALITY :JR UTILITY AUTilORITY SPECIFICATIONS ('M11CHEVER GOVERNS lRENCH). MECHANICALLY TAMP IN 18" LAYERS (ZA - MODIF1ED WITHIN R.O.W.) - SIDE SLOPES IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF O.S.H.A. AND CTilER GOVERNMENTAL REGULATIONS
---2A COARSE AGGREGATE, MECHANICALLY
TAMPED IN e' LAYERS (WITHIN R.O.W. FROM BOTTO~ OF PIPE TO PAVEMENT OR CRADE)
EXCAVATIO\JS IN EXISTING PAVED ROADWAYS SHALL BE COORDINATED WITH THE LOCAL PERMITIING AGENCY, AND ALL EXCAVATION SHALL EE PAVED WITH TEMPORARY BITUMINOUS PAVEMENT FROM THE DATE OF ORIGINAL EX~AVATION UNTIL PERMANENT PAVEMENT IS INSTALLED. (MINIMUM = 90 DAYS, MAXIMUM = 120 DAYS)
THIS DETAIL IS NOT FOR USE WITHIN A STATE RIGHT-OF-WAY. REFER TO THE LATEST APPROVED DOT SPECIFICATIONS FOR TRENCH BEDDING WITHIN A ST/!,TE RIGHT-CF-WAY.
TRENCH BEDDING CLASSIIFICATION (WATER MAIN)
SCALE: N.T.S. REV.: 2015.03.09
AVEl.IENT CR GRADE
~--+.jC----BACK lLL wtTH SUITABLE EXCAVATED
MATER AL OR SELEC- GRANULAR BACK FILL AS PER ~UNICIPALITY
SPECIFlCATlO~S. MECHANIC~.LLY TAMP IN 18" LAYERS (2A - MODIFIED WITHIN R.O.W.)
<46"11 = 2' + O.D.
11----SIDE SLOPES IN ACCORDANCE WITil APPLICABLE REQUIREMENTS OF O.S.H.A. AND C1"ER GOVERNMENTAL REGULA.TlONS
2A COARSE AGGREGATE, MECHANICALLY TAMPED IN 6' LAYERS
t----AASHTO #B COARSE AGGREGATE. MECHANICALLY
TAMPED.
>48'¢ = 2' +- 1.25 x 0.0.
EXCAVATIO\JS IN EXISTING PAVED ROADWAYS SHALL BE COORDINATED WITH THE LOCAL PERMITIING AGENCY, AND ALL EXCAVATION SHALL BE PAVED WITH TEMPORARY BITUMINOUS PAVEMENT FROM THE DATE OF ORIGINAL EX8AVATION UNTIL PERMANENT PAVEMENT IS INSTALLED. (MINIMUM = 90 DAYS, MAXIMUM = 120 DAYS)
THIS DETAIL IS NOT FOR USE WITHIN A STATE RIGHT-OF-WAY. REFER TO THE LATEST APPROVED DOT SPECIFICATIONS FOR TRENCH BEDDING WITHIN A STATE RIGHT-CF-WAY.
TRENCH BEDDING CLASSIFICATION (STORM)
SCALE.: N.T.S.
!W;l£0C OOJTON TAPE
SANITARY SEWER---
PIPE
2' + O.D.
REV.: 2016.03.09
AVEl.IENT CR GRADE
~--!---BACK 'lLL WITH SUITABLE EXCAVATED
MATERAL OR SELEC- GRANULAR BACK I
FILL AS PER ~UNICIPALITY ClR UTILITY AUTHORITY SPECIFICATIONS ('M11CHEVER GOvt.RNS IRl:.NCH). Ml:.CHANICALLY IAMf> IN 18" LAYERS (ZA - MODIFIED WITHIN R.O.W.) - SIDE SLOPE:S IN ACCORDAN~E: WITI1 APPLICABLE REQUIREMENTS OF O.S.H.A. AND C1"ER GOVERNMENTAL REGULATIONS
;t-----AASHTO #B COARSE AGGREGATE
(TAMPED) (2A - MODIFIED Wl1"1N R.O.W. FROM BOTTDt.I OF PIPE TO PA\IE~ENT OR GRADE)
EXCAVATIO\JS IN EXISTING P.A.VED ROADWAYS SHALL BE COORDINATED WITH THE LOCAL PERMITIING AGENCY, AND ALL EXCAVATION SHALL BE PAVED WITH TEMPORARY BrTUMINOUS PAVEMENT FROM THE DATE OF ORIGINAL EX8AVATION UNTIL rERMANENT rAVEMENT IS INSTALLED. (MINIMUM = 90 DAYS, MAXIMUM = 120 DAYS)
THIS DETAIL IS NOT FOR USE WITHIN A STATE RIGHT-OF-WAY. REFER TO THE LATEST APPROVED DOT SPECIFICATIONS FOR TRENCH BEDDING WITHIN A STATE RIGHT-CF-WAY.
TRENCH BEDDING CLASSIFICATION (SANITARY MAIN)
SCALE: N.T.S. REV.: 2015.03.09
REVISIONS
REV DATE COMMENT BY
11128117 REVISEDPERUPDAlED ENP/ BUILDING FOOTPRINT MAM
2 01/05/18 REVISED PER CLIENT COMMENT
ENP/ MAM
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQJIRES
3WORKINGDAYSNOTICE FOR CONSTRUCTION PHASE PND 10
W®<ING DAYS IN DESIGN
STAGE· STOP CALL
~!!!
l-!IJO-:U2-1 '716
POCS SERIAL NUMBER
20163131545
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CADl.D.:
PROJECT:
PC161321 E.N.P JS.R.D. G.J.H. 2017.04.28 AS NOTED PC161321BASE-2
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
1600 MANOR DRIVE, SUITE 200 CHALFONT, PENNSYLVANIA 18914
Phone: (215) 998-9100 Fax: (215) 996-9102 www.BohlerEngineering.com
G.J. HARTMAN
PROFESSIONAL ENGINEER
PENNSYLVANIA. LICENSE No. PE075463
SHEETTlnE:
DETAILS
SHEET NUMBER:
7
OF7
( REVISION 2 -2018.01.05 )
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 1/9/2017 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer Re: 1665 E. Boot Rd./ Dimensional Variance
Dear Board Members,
The Elliot's, owners of 1665 E. Boot Rd. have submitted a Zoning Hearing Board Application seeking relief from the side yard setback in order to enlarge their existing nonconforming pool house. The pool house was permitted by the township and inspected however a recent survey shows that the pool house was constructed within the side yard setback area.
Recommendation:
This is a minor intrusion into the side yard setback that has existed for a number of years without issue. The addition proposed for the pool house does not appear to cause impacts for the neighboring properties. From a planning perspective this request is pretty straight forward and the neighboring property owners have sent a letter of support for the request.
The Planning Commission has forwarded their recommendation to take "No Position" on the variance request.
Staff recommends that the BOS consider taking "No Position" with respect to this variance request with the caveat that should the ZHB decide that the applicant has met the burdens for a variance; reasonable conditions be included in order to minimize any impacts.
F:\Data\Shared Data\Property Management\53-4\53-4-89.3G (1665 E. Boot Rd.)\2018 ZHB\Memo to BOS 01092018.doc
AREA CODE 610
692-7171
January 9, 2018
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
EAST GOSHEN TOWNSHIP PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Re: 1665 E. Boot Rd. I Dimensional Variance request
Dear Board Members:
At their meeting on January 3, 2018 the Planning Commission voted unanimously in favor of the following motion with regard to the Dimensional Variance Request for 1665 E. Boot Rd.:·
Mr. Chairman, I move that the Planning Commission recommend that the Board. of Supervisors take "No Position" with respect to the requested side yard variance relief. However, should the Zoning Hearing Board grant the requested relief, the following conditions should be imposed to mitigate any impacts caused by the granted relief:
1. The applicant shall make every effort to protect the existing trees that currently screen the area of the proposed building addition from the neighboring property
to the east. 2. The applicant shall enhance the existing landscape screening, to the satisfaction of the Township, in order to provide a complete landscape screen for the neighboring property to the east. 3. The applicant shall follow all applicable Federal, State and Local laws and ordinances.
Sin~
Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-89.3G (1665 E. Boot Rd.)\2018 ZHB\PC Rec to BOS 01092018.doc
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Existing Conditions Plan
Site survey plan sheet 1 of 1 showing a rectangular residential lot (240.00 ft by 145.00 ft) on East Boot Road with a 2 1/2 story stone and frame dwelling, pool, pool house, patios, driveways and garage, with a location map inset and a north arrow.
Plan labels
- N/L Applebrook Associates, LP, Deed Ref. 4705-1670, UPI #53-4-89
- N/L Samuel H. & Paula D. Rankin, Deed Ref. 4987-678, UPI #53-4-89.3F
- N/L George H. & Lynne T. Schnyder, Deed Ref. 5289-447, UPI #53-4-89.3H
- Boundary bearings and distances: N 58°08'33" E 145.00'; S 31°51'27" E 240.00'; S 58°08'33" W 145.00'; N 31°51'27" W 240.00'
- East Boot Road; Existing right-of-way line; Philadelphia Electric Company easement; 20' wide sanitary sewer easement; shared driveway easement
- Features: 2 1/2 story stone & frame dwelling, pool, hot tub, pool house, koi pond, slate patio, stone & slate walk, brick walk, landscape, stone & conc. wall, asphalt drive, shared asphalt drive, 2 story stone & frame garage
- Minimum building setback line (typ.)
Other dimension annotations on the drawing are too small to read.
General Notes
- Physical features shown hereon obtained by a field survey completed on October 17, 2017.
- Horizontal datum is based on deed bearings.
- This plat was prepared without the benefit of a title report.
- This plat is representative of existing conditions for which Vastardis Consulting Engineers, LLC (VCELLC) was contracted to perform, except any recorded or unrecorded easements which may not be visible or supplied to Vastardis Consulting Engineers, LLC (VCELLC).
- The locations of underground utilities have been shown based on field survey and surface observation. The remaining text of this note is too small to read.
- Reference is made to plan entitled "Golf Course Site Plan for Applebrook", prepared by Chester Valley Engineers, Inc., Sheet R-02, dated 12/17/1998, last revised 07/12/2000, recorded in Chester County Recorder of Deeds office Plan No. 9015469.
Zoning Requirement
I-2 Planned Business/Research/Limited Industrial/Park/Residential. Zoning requirement at time of development: Planned Golf Course Development.
| Item | Required |
|---|---|
| Min. lot area | 20,000 S.F. |
| Min. lot width @ bldg line | 110 FT. |
| Min. front yard setback | 55 FT. |
| Min. side yard setback | 15 FT. |
| Min. rear yard setback | 55 FT. |
| Max. building area | 20% |
| Max. impervious surfaces | 50% |
| Max. building height | 35 FT. |
Property Owner
Terri L. Elliott, 1665 East Boot Road, West Chester, PA 19380
Property Information
Deed Ref. 8864-2088; UPI #53-4-89.3G
Impervious Coverage (Existing)
Values are small and only partly legible.
| Item | Existing |
|---|---|
| Dwelling | 4,181 S.F. 12.0% |
| Drive | 4,469 S.F. 12.8% |
| Garage | 735 S.F. 2.1% |
| Pool house | 300 S.F. 0.9% |
| Patios/porches/walks/walls | 2,699 S.F. 7.6% |
| Pool | 642 S.F. 1.8% |
| Total | 13,024 S.F. 37.4% |
Legend
- Exist. boundary line
- Exist. right-of-way
- Exist. building setback line
- Exist. iron pin/pipe
Title block
- Location Map, not to scale (site marked)
- Graphic scale 0, 20, 40, 60
- Revision 1, 11-30-17: Add pool house setback dimensions
- Vastardis Consulting Engineers, LLC, 29 Harvey Lane, Malvern, PA 19355
- Plan prepared for: Terri L. Elliott, 1665 East Boot Road, East Goshen Township, Chester County, Pennsylvania
- Drawn by: SGI; Checked by: NV; Date: 10-30-17; Scale: 1"=20'
- Existing Conditions Plan, Sheet 1 of 1
- Nicholas L. Vastardis, P.E.
- Before you dig anywhere in Pennsylvania call 1-800-242-1776. PA One Call, Tax Parcel UPI #53-4-89.3G (remaining text too small to read)
•
·!-------------------.... --
I
I I
--~ -
•
:\JO{ ((j]c(/]/3ffe<EUJ j['/(f}JltfJC~Z§«~(f}Jj~)Cf:!JJ 0~'0uod;<\ [JD J/0 Tanyord Road oo QQ Pie hboro1 PA. /8Vf':J . .:f D c:J,Q ~ors89
215 3'76 2880 Luww.gaspcr.net
• •
..................... _ -- ------ - ----- - ---- - - ---------- - - ------ ---- - --
PROPOSED MASONRY FIREPLACE
PORTION OF THE PA TIO REMOVED & REPLACED REMOVAL: 295 SQ FT PROPOSED: 108 SQ R"
PROPOSED PERGOLA
-------
PROJ[c r !\/JDl'E'55:
1665 EAST BOOT ROAD
Cl 1LN r NANI.
ELLIOTT, TERRI & ERIC
II
I
~
"' I
I I '- 1/
~ I t I I I I '° I ' I Ln I I
N I I I - • I
I J-l+-
I ,-
I :...1 ..... I '° L.
~ L I I I .J.. / " / " / " /
k_ _ _ __ _
"'
---1
••
I I ; /
' I
I - I
--- - - -t-,_.,t=
-
DNC, NA/1[.
VARIANCE PLAN
DRAJ.vN Br:
J. GLEASON GASPER LANDSCAPE
HOUSE: rflNDNAY: GARAGE:
IMPERVIOUS SURF ACE CALCULATION
'665 EAST BOOT ROAD WESTO£STIR PA
EAST GOSl-EN TOWNSl-f'
ZCN:: ~2 LOT SIZE: 34,800SQ FT --- MAX M>ERVIOUS: SO PERCENT I 17,400 SQ FT MAS BLLDNG AREA: 20-PERCENT I 6,960 SQ FT
EJ<ISTl\C REMOVAL PROPOSED
4,181 SF 4,469 SF 733 SF
PROPOSED TOTAL
4,181 SF 4,469 SF 733 SF POOL ffJlJSE: 300 SF 345 SF 645 SF PA nos I PORO£S
W AU<.WAY I WALLS: POOL:
TOTAL:
GENERAL NOTES
2,699 SF 642 Sf
13,024 Sf
295 SF 108 SF 2,512 SF 642 Sf
295 SF 453 SF 13,182 SF
1. GASPER LANDSCAPE HAS IMPOSED THE PROPOSED POOL HOUSE STRUCTURE ONTO THE EXISTING CONDINTIONS PLAN DRAWN BY VAST ARDIS CUNSUL TING ENGINEERS, LLC DA TED 10/ 30/ 17
\4''\"
PROPOSED POOL HOUSE EXPANSION (345 SQ FT)
1<\' <'t."
121 :/
\i.' i.y/
\"\' 1111"
EXISTING POOL HOUSE
,,,. "" /
7
------ ==-=-= - - - ---
SL ALI·
1'' = 10'
DA TF.
11/ 29/ 2017
Memo East Goshen Township
Date: To:
From: Re:
January 11, 2018
Board of Supervisors Rick Smith, Township Manager Paoli Pike Trail Easements Segments (C, D & E)
In order to construct the Paoli Pike Trail the Township needs to acquire easements along Paoli Pike. However, since we are using federal and state grant funds for part of the trail we have to follow the Penn DOT procedure for acquisition of any easement.
McMahon Associates has prepared a plan that depicts the required easements/right-of-ways. However, the Board has to approve the plan and authorize the submission of the plan to Penn DOT for their approval before we can meet with the property owners.
McMahon has been in discussion with Penn DOT during the preparation of this Plan and we anticipate that Penn DOT will sign the Plan in the very near future.
Once Penn DOT signs the Plan we will then be able to meet with the various property owners and begin negotiations for the easements.
Under the terms of our grants we need to acquire the required easements and submit them along with the plans for the project to Penn DOT in 2019.
Attached is a copy of the Plan and resolution.
Motion: I move we adopt resolution 2017-176
F:\Data\Shared Data\ABC'S\Board ofSupervisors\Resolutions\2018\Memo Paoli Pike Trail Easements 2018-176.docx
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. ';2 0 1 I - I 7 b
WHEREAS, the Township has developed a master plan for a multimodal trail (the "Trail") to be constructed along Paoli Pike from Airport Road to Line Road (the "Trail Project"); and
WHEREAS, portions of the Trail will be constructed within areas of right-of-way of Paoli Pike and Boot Road and areas of easements which the Township intends to acquire from owners of various parcels of real property along Paoli Pike and Boot Road; and
WHEREAS, the Township's engineering consultant, McMahon Associates, Inc., has prepared the attached right of way plans titled, "Drawings Authorizing Acquisition of Right of Way for State Route 2014" consisting of 13 sheets, (the "Right of Way Plans") which must be approved by the Pennsylvania Department of Transportation ("PennDOT") before the Township may negotiate to acquire the necessary easements for construction, maintenance and installation of the Trail; and
WHEREAS, before PennDOT can approve the Right of Way Plans, they must be approved and signed by the Board of Supervisors;
NOW THEREFORE, BE IT RESOLVED by the Board of Supervisors of East Goshen Township as follows:
The Township approves the Right of Way Plans and authorizes the Chairman of the Board of Supervisors to sign the same prior to submission to PennDOT.
RESOLVED this __ day of ______ , 2018.
AITEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
E. Martin Shane, Chairman
Carmen R. Battavio, Vice-Chairman
Janet L. Emanuel, Member
Michael P. Lynch, Member
David E. Shuey, Member
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2018\Paoli Pike Trail Easement Resolution.docx
2
SCALE
0 25 HORIZONTAL
DESIGN DESIGNATION
HIGHWAY CLASSIFICATION
DESIGN SPEED PAVEMENT WIDllH SHOULDER WIDllH MEDIAN WIDllH
COMMUNITY ARTERIAL (SUBURBAN CORRIDOR) 40 MPH 25'-50' 2'-20' N/A
DISlRICT COUNTY TO\\NSHIP BOROUGH ROUTE SECTION TOTAL SHEETS CHESTER EAST GOSHEN 2014 PPT R/W
EAST GOSHEN TOWNSHIP
DRAWINGS AUTHORIZING ACQUISITION
OF RIGHT-OF-WAY
FOR
STATE ROUTE __ 20_1_4_ SECTION PPT R/W
IN ___ C~H=E~S~TE~R~ __ COUNTY
6-0
FROM STA 1129+67.66 TO STA 1173+04.86 LENGTH 3,319.40 FT 0.629 Ml
50 FEET
TRAFFIC DATA
CURRENT ADT DESIGN YEAR ADT DHV D T
11,280 (2019) 16,238 (2040) 1,786 55% 17%
FROM SEG 0050 OFFSET 2058 TO SEG 0060 OFFSET 2768
llHIS PLAN PREPARED PURSUANT TO SECTION 2003(e) OF THE ADMINISTRATIVE CODE, AS AMENDED, 71 P.S. SECTION 513(e}, AND SECTION 302(b)(3) OF llHE EMINENT DOMAIN CODE, 26 Pa.C.S., SECTION 302(b)(3).
COMMONWEALTH OF PENNSYLVANIA COUNTY OF CHESTER SS
BEFORE ME, A NOTARY PUBLIC, PERSONALLY CAME
KNOWN TO ME OR SATISFACTORILY PROVEN TO BE THE PERSON WHO ~------------1 HAS BEEN AUTHORIZED BY WRITTEN DELEGATION RECORDED IN THE OFFICE FOR THE l'HNESS THE SIGNATURE OF THE BOARD OF RECORDING OF DEEDS, ETC. IN SUPERVISORS CHAIR, ON PLANS AUTHORIZING ACQUISITION OF RIGHT-OF-WAY BY THE TOWNSHIP, CHESTER COUNTY, PA. AND AS SUCH AUTHORIZED REPRESENTATIVE ACKNOWLEDGED THE WITHIN PLAN, COMPRISING IN INSTRUMENT # _1_3_ SHEETS, TO BE AN OFFICIAL PLAN OF THE
WITNESS MY HAND AND SEAL OF OFFICE TOWNSHIP AND DESIRED THAT THE SAME BE
RECORDED AS SUCH.
DATE WITNESS MY HAND AND NOTARIAL SEAL
RECORDER
PREPARED BY: MCMAHON ASSOCIATES INC
425 COMMERCE DRIVE FORT WASHINGTON, PA 19034
KENNETH SWIFT, P.L.S.
DATE: ____ _
PREPARED BY: MCMAHON ASSOCIATES INC
840 SPRINGDALE DRIVE EXTON, PA 19341
STEPHEN C. GIAMPAOLO, P.E.
DATE: ____ _
SEGMENT C SEGMENTS D&E
RECOMMENDED
13
MPMS NO.: 107176 MPMS NO.: 107630
DATE: ____ _
DISTRICT EXECUTIVE
RESOLUTION NUMBER:~----
APPROVED DATE: ____ _
(BOARD OF SUPERVISORS CHAIR)
ACT 181 UTILITY LIST
PENNSYLVANIA ONE CALL SYSTEM, INC.
{EMERGENCY 1-800-242-1776)
SERIAL NO. 20162091979
AQUA PENNSYLVANIA, INC 762 LANCASlER A VE BRYN MAYtR, PA 19010 (610) 645-4203 ATTN: WIWAM ZAHN ---w·---
AT&T CORPORATION C/O THE lREC GROUP 900 OLD MARPLE ROAD SPRINGFIELD, PA 19064 (610) 328-6405 ATTN: JAY EVERLY
PECO ENERGY CO. - GAS 300 FRONT SlREET, BUILDING 2 WEST CONSHOHOCKEN, PA 19428 (610) 832-6534 ATTN: MICHAEL GABRIEL ---G---
SUNOCO PIPELINE, LP ONE CALL DEPT. 525 FRITZTOYrN RD SINKING SPRING, PA 19608 (610) 670-3252 ATTN: WALlER SKORUPSKY ---OH--- ----P· ---
COMCAST CABLE COMMUNICATIONS VERIZON PENNSYLVANIA, LLC. C/O AMMERICACOM LLC 15 E.MONTGOMERY PL 55 WEST SlREET 02 FLOOR ROOM 1 NEWBILLE, PA 17241 PITTSBURG, PA 15212 (717) 776-1073 (412) 237-2285 ATTN: KEITH ALLRIDGE ATTN: DEBORAH DELIA ---OH--- EAST GOSHEN TOYrNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 (610) 692-7171 ATTN: LEWIS (RICK) SMITH ---s---
INTERSTATE ENERGY COMPANY 214 SHOEMAKER ROAD POTTSTOWN, PA 19464 (610) 327-5325 ATTN: MARK STORY ---P---
---TU--- ---OH----
WIWAMS TRANSCONTINENTAL GAS PIPELINE COMPANY 60 BACTON HILL ROAD FRAZER, PA 19355 (610) 644-7373 ATTN: BRIAN RICH ---P---
LOCATION
SR 2014
SR 2014
RTE
re'
~
0:: .... 5 N
0:: rn
TABULATION OF OVERALL LENGTH
STATION TO STATION FEET
STA 1129+67.66 TO STA 1173+04.86 4,337.20 TABULATION OF AUTHORIZATION LENGTH
LOA STA 1129+67.66 TO END STA 1141+58.89 1191.23
BEGIN STA 1142+16.60 TO END STA 1145+10.68 294.08
BEGIN STA 1145+42.04 TO END STA 1145+97.00 54.96
BEGIN STA 1146+24.44 TO END STA 1155+68.00 943.56
BEGIN STA 1164+69.29 TO LOA STA 1173+04.86 835.57
TOTAL 3,319.40
SUMMARY OF PROJECT COORDINATES
BASED ON PENNSYLVANIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE
COORDINATES STATION POINT EAST BEARING NORTH 1129+67.66 P.O.T. (BEGIN STATION) 245745.0017 2583233.6850 1137+31.24 P.C. 246142.9349 2583885.3752 N58'35'28"E 1138+80.76 P.I. 246220.8580 2584012.9888 1140+30.13 P.T. 246288.5129 2584146.3307 N63'05'52"E 1141+65.13 P.C. 246349.5954 2584266. 7190 1142+21.99 P.I. 246375.3236 2584317.4270 1142+77.43 P.T. 246418.2921 2584354.6689 N40'54'59"E 1149+79.99 P.I. 246949.1917 2584814.8132 N40'40'52"E 248273.8650 2585953.4536 1167+26.77 P.I. 1173+04.86 P.O.T. (END STATION) 248713.2120 2586329.1720 N40'32'10"E 1174+08.12 P.I. 248791.6875 2586396.2823 PECO ENERGY CO. - ELECTRIC 1050 W. SWEDESFORD ROAD BERWYN PA, 19312 4 PLACE COORDINATES ARE FOR COMPUTATIONAL PURPOSES (610) 725-7129 ATTN: BILL HENSIL
ONLY AND DO NOT IMPLY A PRECISION BEYOND 2 DECIMALS
---EU--- ---OH---
SUMMARY OF CONTROL POINT COORDINATES
POINT
12 7 3
BASED ON PENNSYLVANIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE
COORDINATES DESCRIPTION STATION OFFSET EAST NORTH REBAR W/CAP 1133+30.16 17.01' RT 245919.3940 25B3551.9277 REBAR W/CAP 1155+16.94 42.74' RT 247328.5263 2585197.2390 REBAR W/CAP 1180+26.94 20.79' RT 249221.8452 2586843.8849
4 PLACE COORDINATES ARE FOR COMPUTATIONAL PURPOSES ONLY AND DO NOT IMPLY A PRECISION BEYOND 2 DECIMALS
SUMMARY OF REQUIRED RIGHT-OF-WAY
BREAK POINT COORDINATES
BASED ON PENNSYLVANIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE
COORDINATES RTE STATION OFFSET NORTH EAST
~w f--------1-----+--------1---:-=--,...,-:-::; ~:;:; 1141+20.00 29.47' LT 246355.4539 2584213.1423 '- 1141+58.89 120.00' LT 246453.7845 2584206.8558 ~O:: l-'-'--'-'-'-'-'-----lr-=-'-'-'-''--""--+--------1~-----1
$PROPOSED MONUMENT LOCATION 4 PLACE COORDINATES ARE FOR COMPUTATIONAL PURPOSES ONLY ANO DO NOT IMPLY A PRECISION BEYOND 2 DECIMALS
TABULATION OF SEGMENT EQUALITIES
SR 2014 SEGMENT 0050 OFFSET 2058 = STA 1129+67.55 SEGMENT 0060 OFFSET 0000 = STA 1145+37.07 SEGMENT 0060 OFFSET 2768 = STA 1173+04.86
LIMIT OF AUTHORIZATION STATION 1129+67.66 SEGMENT 0050 OFFSET 2058 SR 2014 SECTION PPT R/W EAST GOSHEN TOWNSHIP CHESTER COUNTY
SCALE 500' 0 500' ~ . .. ••
I 1000' I
MILES
0.821
0.226
0.056
0.010
0.179
0.158
0.629
GENERAL NOTES (CONTINUED)
DISTRICT I COUNTY I ROUTE I SECTION I SHEET s-o I OiESTER I 2014 I PPT R/W I 03 OF 13
INDICATES THE SLOPE LIMIT EAST GOSHEN TOWNSHIP 'ifiltla!1lt I RE\ISIONS I OAlE I BY I I I I I I GENERAL NOTES
TRAFFIC SIGNAL EASEMENT. AN EASEMENT FOR THE THE LEGAL RIGHT-OF-WAY ON SR 2014, FORMERLY CONSTRUCTION, INSPECTION, OPERATION, MAINTENANCE, LR 143 {PAOLI PIKE) FROM STATION 1128+50.00 TO REPAIR, RECONSTRUCTION AND ALTERATION OF A STATION 1173+04.86 IS 40 FEET WIDE ESTABLISHED TRAFFIC SIGNAL AND APPURTENANCE THERETO. THE BY PENNSYLVANIA PAMPHLET LAWS DATED APRIL 14, EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER 1834 AND RECORDED ON PAGE 442. ALSO FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS RECORDED IN THE CHESTER COUNTY COURTHOUSE IN NOT DETRIMENTAL TO ITS USE FOR TRAFFIC SIGNAL ROAD DOCKET G PAGE 172 AND ORIGINAL PAPERS PURPOSES. VOLUME 46 PAGE 47.
SIDEWALK EASEMENT. AN EASEMENT FOR THE THE LEGAL RIGHT-OF-WAY ON SR 2014, FORMERLY CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, LR 143 {PAOLI PIKE) FROM STATION 1151+14.36 TO RECONSTRUCTION AND ALTERATION OF A SIDEWALK. STATION 1154+74.02 IS VARIABLE FROM 40 FEET TO THE EASEMENT SHALL NOT PREVENT THE PROPERTY 100 FEET WIDE BASED ON DRAWINGS AUTHORIZING OWNER FROM MAKING ANY LEGAL USE OF THE AREA ACQUISITION OF RIGHT-OF-WAY FOR SR 2014 WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK SECTION 69S R/W IN CHESTER COUNTY, SIGNED BY PURPOSES. THE SECRETARY OF TRANSPORTATION ON SEPTEMBER
TEMPORARY CONSTRUCTION EASEMEN~ AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY THE TOWNSHIP.
BUILDINGS AND STRUCTURES MARKED [g HAVE BEEN OR ARE TO BE REMOVED OR ALTERED BY THE DEPARTMENT OR OTHER AUTHORITY RESPONSIBLE FOR THE PAYMENT OF PROPERTY DAMAGES.
5, 1996 AND RECORDED IN THE CHESTER COUNTY COURTHOUSE IN PLAN BOOK 91, PAGE 10.
THE LEGAL RIGHT-OF-WAY ON SR 2014, FORMERLY LR 143 {PAOLI PIKE) FROM STATION 0+00 TO STATION o+oo IS VARIABLE WIDTH BASED ON DRAWINGS DEPICTING RIGHT-OF-WAY TO BE DEEDED TO THE COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION UNDER HOP APPLICATION NO. 134747 BY EAST GOSHEN TOWNSHIP FOR STATE ROUTE 2014 SECTION EGT R/W AND STATE ROUTE 2020 SECTION EGT R/W, AND STATE '----------------------tROUTE 0352 SECTION EGT R/W IN CHESTER COUNTY,
\ ( VJ ~~ /o-\J'
Q
LEGEND
-- /
LIMIT OF AUTHORIZATION STATION 1173+04.86 SEGMENT 0060 OFFSET 2768 SR 2014 SECTION PPT R/W EAST GOSHEN TOYrNSHIP CHESlER COUNTY
SIGNED BY THE SECRETARY OF TRANSPORTATION ON ------- AND RECORDED IN THE CHESTER COUNTY RECORDER OF DEEDS OFFICE ON ------- IN PLAN BOOK - PAGE
ALL REQUIRED RIGHT-OF-WAY FOR THIS PROJECT SHALL BE ACQUIRED IN FEE SIMPLE UNLESS OTHERWISE NOTED. AREAS, IF ANY, NOT TO BE ACQUIRED IN FEE SIMPLE SHALL BE ACQUIRED IN THE LESSER ESTATE OR INTEREST NOTED ON THE PLAN SHEET.
ALL PROPERTIES ARE PLOTTED FROM THE DEED OF RECORD, RECORDED SUBDIVISION OR LOT PLANS, OR FROM FIELD SURVEY. PROPERTY LINES WERE SURVEYED ONLY WHEN DETERMINED NECESSARY BY THE PROFESSIONAL LAND SURVEYOR RESPONSIBLE FOR THE PROJECT. PROPERTY LINES NOT ESTABLISHED BY FIELD SURVEY WERE PLOTTED BASED ON EXISTING TOPOGRAPHICAL FEATURES AND LIMITED FIELD DATA.
THE HORIZONTAL SURVEY DATUM IS BASED ON THE PENNSYLVANIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE (NAO 83) THE AVERAGE COMBINED SCALE FACTOR = 0.9999942.
THE VERTICAL CONTROL IS BASED ON NAVO 1988 DATUM.
THE HALF CIRCLED NUMBER INDICATES A SCALED DIMENSION. ~
INDICATES PROPOSED MONUMENTED DIM+~~J9NS ~
S.R. 2014 PREVIOUSLY KNOWN AS L.R. 143.
ALL CURVE DATA IS BASED ON THE ARC DEFINITION UNLESS OTHERWISE INDICATED. --
PROJECT
STATE HIGHWAY
TOWNSHIP/ COUNTY ROAD
L("'K' . 1!..JIJ:., r1't'\ g;p=.._9iJA. Ii SIIl'HEN C. GWIPlru> J:1
LOCATION MAP '~=/ffl/
PARCEL NO OWNER OWNER iJA ACERO HOLDINGS, LLC A THOMAS J YOUNG & SUSAN M YOUNG A
DANIEL M MCNEFF & @ PAOLI REAL TY PARTNERS, LP PA TRICIA M MCNEFF 0 PARSONS 1336, LLC @ GOSHEN EQU!TTES LLC
0 PARSONS RENTAL IV A EAST GOSHEN TOWNSHIP &
THOMAS R PERA/NO & @ COMMERCE BANK/PENNSYLVANIA N.A. DORIS D PERA/NO
0 GOSHEN EXECUTTVE A PAUL M BAKER & MARY R BAKER CONDOMINIUM ASSOC/A TTON A TRU- TEAM, INC. A EDWARD T MCFALLS & LEICH T MCFALLS
0 SUNOCO, LLC A EAST GOSHEN TOWNSHIP & EAST GOSHEN TOWNSHIP A PAOLI PIKE ASSOC/A TES, LP A ANDREW W mER & PA TRICIA A mER A EAST GOSHEN TOWNSHIP A DARREN A PARK & MARY A PARK ® WEST CHESTER AREA SCHOOL DISTRICT A
KENNETH H CROSSMAN & @ KEYSTONE ANANCIAL BANK THERESA R CROSSMAN
LEGEND 0 PLAN Q PARCEL IDENTIFICATION NUMBER ~ PARCEL IDENTIFICATION NUMBER - NO ACQUISITION
TABULATION OF PROPERTY OWNERS
OWNER A
PASQUALE D'ABUNDO & CONCETTA D'ABUNDO. CO-TRUSTEES UNDER THE CONCETTA D'ABUNDO REVOCABLE TRUST A
@ CARROLL E S/NQUETT A A
BENTLY FAMILY LIMITED A PARTNERSHIP I, LP
@ THORNDALE INVESTMENT CROUP A A KALEMJIAN INC. A
@ REDEEMED PROPERTTES LP A A TOPMAL LLC A ~
NICHOLAS PERAKIS & ANDREA N PERAKIS
A
JESSE W. COX, N. WALTER SUPPLEE, J. RUSSELL HICKE, & JOHN V. NOLAN, TRUSTEES OF THE GOSHEN MONTHLY MEETTNC CEMETERY A EAST GOSHEN TOWNSHIP A EAST GOSHEN TOWNSHIP
0 100' 200' I
OWNER
EAST GOSHEN TOWNSHIP
PENNSYLVANIA DEPARTMENT OF TRANSPORTA TTON
EAST GOSHEN TOWNSHIP
PENNSYLVANIA DEPARTMENT OF TRANSPORTA TTON
EAST GOSHEN TOWNSHIP
PENNSYLVANIA DEPARTMENT
OF TRANSPORTA TTON
EAST GOSHEN TOWNSHIP
400'
SHEET INDEX BLOCK
DESCRIPTION
TITLE SHEET INDEX SHEET GENERAL NOTES SHEET PLAN SHEETS
LIMIT OF AUTHORIZATION STATION 1173+04.86 SEGMENT 0060 OFFSET 2768 SR 2014 SECTION PPT R/W EAST GOSHEN TOWNSHIP CHESTER COUNTY
@
COUNTY ROUTE SECTION SHEET
OiESTER 2014 PPT R/W 02 OF 13 EAST GOSHEN TOWNSHIP
RE"1SIOOS DATE BY
SHEET
01 02 03 05 - 13
SHOULDER 11' THROUGH LANE VARIES
MATCH EXISTING
GROUND
SHARED USE
TH
VARIES •I 1
2' GRADED SHOULDER TOPSOIL 11' CENTER LEFT- TURN LANE
VARIE~
CROWN POINT
13' CURBED LANE
2' SAWCUT
®
SR 2014 PAOLI PIKE
SHARED USE PATH STA. 1155+01.80 TO STA. 1173+18.05
NOT TO SCALE
R/W ID.
PAOLI PIKE CARTVIA Y
5' 8' SHARED-
LIMIT OF DISTURBANCE
MATCH EXISTING GROUND
PLCC CURB
SHARED USE
PATH Ck. VARIES
2' GRADED SHOULDER ~ TOPSOIL
LIMIT OF DISTURBANCE (2' MIN WIDTH)
EXISTING GROUND~-----------
2' GRADED SHOULDER TOPSOIL
MIT OF DISTURBANCE (2' MIN WIDTH)
PROTECTIVE RAILING (WHERE INDICATED)
----------. ___ {EXISTING GROUND
COUNTY ROUTE SECTION SHEET
CHESTER 2014 PPT R/W 04 OF 13 EAST GOSHEN TOWNSHIP
RE'dSIONS DATE BY
1 ---------------------£"Xtsi111;;-,,:..-vt:-Uiii'i-----------------------.,--------- ------- ------------------------------- _________________________ J
MATCH EXISTING
GROUND
'"Ji%~~~;c;,,,,_,_ • r p~':~G
~~63~DEXISTING '\>'.\\>.'-.''·-- l1:::::::::::::::::::::::
TYPICAL SECTION
SR 2014 PAOLI PIKE
SHARED USE PATH STA. 1146+27.17 TO STA. 1154+43.53
NOT TO SCALE
I
SHARED USE I r ~:~_P_A_TH~Ck.~~~~~~~~~~V~A~Rl~ES~~~~~~~~~~~~~~·~ R/W ID.
I lr2' GRADED SHOULDER I PLACEMENT OF TOPSOIL
LIMIT OF PAOLI PIKE CARTWA Y
10' SHARED USE
TYPICAL SECTION
SR 2014 PAOLI PIKE
SHARED USE PATH STA. 1129+68.27 TO STA. 1145+00.91
NOT TO SCALE
DISTURBANCE
I
-;~~:;;;;;~~G r=:= ~~;;;;;;;;,:,<' ~~ i =;;;;;;;;;:;:;~'. T-
LEGEMll.
G)SUPERPAVE ASPHALT MIXTURE DESIGN, WMA WEARING COURSE, PG 64-22,
3 TO < 10 MILLION ESALS, 9.5 MM MIX, 1 1/2" DEPTH, SRL-H
@SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BINDER COURSE, PG 64-22,
3 TO < 10 MILLION ESALS, 19.0 MM MIX, 2.5" DEPTH
@SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BASE COURSE, PG 64-22,
3 TO < 10 MILLION ESAL'S, 25 MM MIX, 10" DEPTH
@SUBBASE, 8" DEPTH (NO. 2A)
@MILLING OF BITUMINOUS PAVEMENT SURFACE, 1 1/2' DEPTH, MILLED
MATERIAL RETAINED BY CONTRACTOR
@) SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BINDER COURSE (LEVELING),
PG 64-22, 3 TO < 10 MILLION ESALS, 19.0 MM MIX
(i) BITUMINOUS TACK COAT
@ASPHALT PAVEMENT PATH, 4" MIN DEPTH
@STONE PATH BASE, 4" MIN DEPTH
ACERO HOLDINGS LLC
UPI #53-4-169
A DANIEL M MCNEFF &
PA TRICIA M MCNEFF
UPI #53-4-97.2
LEGEND
p?77,l PROPOSED BITUMINOUS WIDENING/ ~ PA\£MENT RESTORATION
PROPOSEO DRIVEWAY . ADJUSlMENT
~ _,Cl ).. C§
~Q:: J_ ~
C) il1
,!_~ ~~ (\:'Q:: _, C) ~LC c:i _,
I
~ cij,
-..JC) )..C§
~Q::
J_~ c:iilj
,!_~ (5c:i ~!.::: (\:'Q::
~&' ~ __,
65'
C'.:l ~ Q:: S3' ~~ ~I ~t: l3
~
BM #14 ELEV. 389.52 21.BO' RT STA. 1129+81.85 TOP OF BOLT ON THE NORTHEAST CORNER OF TRAFFIC SIGNAL MASTARM
'-- rs ~ (ij l;)
~
~ :::i "-' ~ Ii;,
w
"
~ __,Cl ).. C§ ~ Q:: J_ ~ C) Oj
,!_~ ~~
_, >::) G LC "-' __,
.··~
··~.
BT~GUY #103
LIMIT OF AUTHORIZATION STATION 1129+67.66 fS I ~I (f I
SEGMENT 0050 OFFSET 2058 SR 2014 SECTION PPT R/W EAST GOSHEN TOWNSHIP
f's/
&11 01
CHESTER COUNTY
~ ~ S3'
-..JC) ~
)..C§ K ~Q:: ~
":t- J..~ i-!.
ai?j l3
,!_~ '--
(5c:i ~!.::: ~ "''"' -..JC) ~LC c:i __,
SHARED USE PATH
-X- PROTECTIVE RAILING
X REMOVE EXISTING TREE/SHRUB
__ _ff2!}E OF PAVEMENT
0
" BTCO /104
SCALE
25 50 FEET
COUNTY ROUTE SECTION SHEET
a-IESTER 2014 PPT R/W 05 OF 13
THOMAS R PERA/NO & DORIS D PERA/NO
UPI #53-4-117
liQIES;
SHRUB e
GRASS
1) TRAFFIC SIGNAL EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, OPERATION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A TRAFFIC SIGNAL AND APPURTENANCE THERETO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR TRAFFIC SIGNAL PURPOSES.
2) SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, IN°SPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
3) TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY THE TOWNSHIP •
SURVEY BOOK #201661
EAST GOSHEN TOWNSHIP
RE'ASONS DATE BY
RIGHT-OF-WAY \~ I LINE I°' I
\<::> I
I~ I I I
I I
llJ 0
t--w w :i:: VI z 0
0 w :::> z F z 0 (.)
6" EC • 6" EC
GRASS
0 PARSONS RENTAL IV
UPI #53-4-155
2 STORY BRICK WAREHOUSE BUILDING
20" EG e GRASS
/,,_ _,,,_
/ a:--... REQUIRED SIDEWALK
EASEMENT
10' SHARED USE PATH
20" EG e ~\~o, ,-.J'"'.rV°'r-><'~~
35 PAOLI PIKE ;!l ~({er T --------~~----- EDGE OF PAVEME~- - ---------w--- - ----w TU ?:W TO ------ w TU &=----11J
'\ I BMf51 vZ/;fOB GRASS UP BTC#IOB \ I \ ~ I
Ii£: I GRASS I Cl I Iii; I I I
I I
LEGAL RIGHT-OF-WAY
LINE
LEGEND ~ PROPOSED BITUMINOUS \\1DENING/ ~PAVEMENT RESTORATION
b~~~~.p . ADJUSTMENT
THOMAS R PERA/NO & DORIS D PERA/NO
UPI #53-4-117
D SHARED USE PATH
-x- PROTECTIVE RAILING
X REMOVE EXISTING TREE/SHRUB
GRASS
~ ~ lJ)
\~ ~~ll.. y '
75'
TRANSCONTINENTAL GAS PIPELINE R/W
SB.....2l2li Pl STA 1138+80.76 6 = 04"30'24" RT D = 01 "30'28" T = 149.52' L = 298.89' R = 3800.00' E = 2.94' PC STA 1137+31.24 PT STA 1140+30.13
0 SCALE
25
20' STORM SEWER
ESMT
50 FEET
~ ii: Cl ,_ li'i
@
GOSHEN EXECUTIVE CONDOMINIUM ASSOC/A TION
UPI #53-4-1
<
I vz1/H I
COUNTY ROUlE SECTION SHEET
OJESTER 2014 PPT R/W 06 OF 13 EAST GOSHEN TOWNSHIP
RE\1SIONS DATE BY
I I I I I I I I ~ I ~k / \ ~~~ I \ ~lrj /
) t:;~LI I C:> '-' ....._ --~-- / Ct)
SUNOCO LLC UPI #53-4-2
/
I
LEGAL RIGHT-OF-WA y
LINE I I END AUTHORIZATION + . SEGMENT 0050 OFFSET 3249 SR 2014 SECTION PPT R/W
TRU- TEAM INC UPI #53-4-118
ANDREW W TYLER & PA TRICIA A TYLER
UPI #53-4J-1
1) SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
2) TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRlllNG BY THE TOWNSHIP.
SURVEY BOOK #201661
<O 0
@
SB...2.Qli Pl STA 1142+21.99 fl = 2210'53" LT D = 19·45'07" T = 56.86' L = 112.30' R = 290.08' E = 5.52' ~ PC STA 1141+65.13 1 PT STA 1142+ 77.43
I I
. I
I I I
GOSHEN EXECUTTVE CONDOMINIUM ASSOC/A TTON I I I UPI #53-4- 1 8" DECO I \ ~ I
\ ~k I 0 18" DEC
) ~~~ I h..~l() -~ I C):::::>~ C)G CQ
+ . mu- TEAM INC SEGMENT 0050 OFFSET 3307 UPI #53-4-118 SR 2014 SECTION PPT R/W If---- ----- _..-If--\ A ANDREW W mER & PA TRICIA A
UPI !153-4J-1
~
5UN
BM #10 ELEV. 409.85 20.34' LT STA. 1143+62.14 SQUARE CUT ON TOP OF CURB
SUNOCO LLC G UPI #53-4-2 yf:RHAN
u£L 5 ocO f
TATION 0
CRASS
CRASS
~~ & -------s------- ~------S EAST GOSHEN TOWNSHIP
UPI !153-4-75
LEGAL RIGHT ------ FOR TOWN~kp
1~AJ;,f/NE ------EDCE_O._'F ---- ------- Ba PAVEMENT _____ _ or ROAD /"\'UT- --- -------- vi -OFF (T-
@
PAOLI REAL TY PARTNERS.
UPI !153-4- 6.3
_------4----~---~-J!ZPE OF PA vt; -379) f ---- Y._E!f! '/
"CLE~Tm~~ -------- ------- FOR TOWNff;'P-WAY LINE ---
DARREN A PARK AND MARY A PARK
YPI !153-4K-1
,,,, ROAD
KENNETH H CROSSMAN & THERESSA R CROSSMAN
UPI #53-4K-2
1} TRAFFlC SIGNAL EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, OPERATION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A TRAFFlC SIGNAL AND APPURTENANCE THERETO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY Ol™ER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL
3) TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE L~ND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN ~ITING BY THE TOl™SHIP.
LEGEND ~ PROPOSED BITUMINOUS \\IDENING/ ~ PAVEMENT RESTORATION D SHARED USE PATH TO ITS USE FOR TRAFFIC SIGNAL PURPOSES.
2) SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY Ol™ER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
0 SCALE
25 50 FEET PROPOSED DRIVEWAY - x- PROTECTIVE RAILING . ADJUSTMENT
X REMOVE EXISTING TREE/SHRUB
SURVEY BOOK #201661
COUNTY ROUlE SECTION SHEET
D-iESlER 2014 PPT R/W 07 Of 13 EAST GOSHEN TO~SHIP
AE~SON S DA TE BY
@
GOSHEN EQUIT1ES LLC
UPI #53-4-77
z '---''--''-----" 0 1-----
@
~ PAOLI PIKE ~ tt----TU\---------h\~,--------Tu·------- z 0 u
LEGEND
[7777,::j PROPOSED BITUMINOUS Yt1DENING/ ~PAVEMENT RESTORATION
PROPOSED DRIVEWAY ADJUSTMENT
D SHARED USE PATH
- x - PROTECTIVE RAILING
x REMOVE EXISTING TREE/SHRUB
@
PAOLI REALTY PARTNERS. LP
UPI if53-4-6.3
BITUMINOUS PARKING AREA
GRASS
LEGAL RIGHT-OF-WAY
LINE
LPo CONC CURB
0
REQUIRED SIDEWALK EASEMENT
30"DEC
1 c:i
SCALE
25 50 FEET
SR 2014 Pl STA 1149+79.99
6 = 00'14'07" LT D = NO CURVE
£AST GOSHEN TOWNSHIP
UPI if5J -4-255.1 0:.
I
BM fl8 EL.EV. 395.03 37.80' LT STA. 1150+84.71 MAG NAIL IN CONC CURB
COUNTY ROUTE SECTION SHEET
OiESTER 2014 PPT R/W 08 OF 13 EAST GOSHEN TO'WNSl-flP
RE\1~00 5 DATE BY
£AST GOSHEN TOllNSHIP
UPI #53-4-255
£AST GOSHEN TOWNSHIP SANITARY SEWER EASEMENT
'---''----+---- TU'------+:31\- TU TU TMH '°""'~-~=-~5'----,'---~--5-----~·~ .Lll--.A_Q.g.J}ii_P_~_lr:'fi..!.{fflL...LRJi...C/J..u '-'-D
REQUIRED SIDEWALK EASEMENT
26''oEC CONC CURB
SMH #8~5500 f GV F-F f F
LEGAL RIGHT-OF-WAY
LINE
BITUMINOUS PARKING AREA
@
GOSHEN £QUIT7£S LLC
UPI #53-4-77
TEMPORARY CONSTRUCTION
EASEMENT
1) TRAFFlC SIGNAL EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, OPERATION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A TRAFFlC SIGNAL AND APPURTENANCE Tl-IERETO. Tl-IE EASEMENT SHALL NOT PREVENT Tl-IE PROPERTY O'WNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR TRAFFlC SIGNAL PURPOSES.
2) SIDEWALK EASEMENT. AN EASEMENT FOR Tl-IE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. Tl-IE EASEMENT SHALL NOT PREVENT Tl-IE PROPERTY O'WNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
3) TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. Tl-IE EASEMENT IS REQUIRED ONLY UNTIL Tl-IE CONSTRUCTION OR WORK INDICATED BY Tl-IE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY Tl-IE TO'WNSHIP.
SURVEY BOOK #201661
9
DO 0
~ ::i::: (/) z 0
@
STRUCTURE DATA ~ STRUCTURE NUMBER S-10394 STATTON: 115J+5S.77 TYPE: ntTN CELL BOX CULVERT SPAN: 40' SKEW. 90•00•00• 'MOTH 54' ROAOWA Y 'MOTH
LEGAL RIGHT-OF-WAY
LINE
EAST GOSHEN TOWNSHIP
UPI ;f53-4-255
EAST GOSHEN TOWNSHIP SANITARY SEWER EASEMENT
--1-~~~~~~ s ~~~~~~~s~~~~~~~s~~~~~+-~s~~~~~~~s~___,1~~~~~
HEAVY BRUSH
LEGEND ~ PROPOSED BITUMINOUS WIDENING/ ~PAVEMENT RESTORATION
~~~i~Ef ADJUSTMENT . -
HEADWALL
D SHARED USE PATH
-x- PROTECTIVE RAILING
x REMOVE EXISTING TREE/SHRUB
BITUMINOUS PAVING
@
COMMERCE BANK PENNSYI.. VANIA, N.A.
STRUCTURE DATA ~ STRUCTURE NUMBER (NONE) STATTON: 1153+90.55 TYPE: TRIPLE CELL BOX CUL VERT SPAN: 57' 'MOTH 69' (WALL TO WALL}
UPI #53-4-77.1A
0
BM #7 ELEV. 391.07 23.93' RT STA. 1156+75.12 SQUARE CUT ON TOP OF CURB
SCALE
25 50 FEET
PAUL M BAKER 4t MARY R BAKER UPI #53-4-247
I j
COUNTY ROUlE SECTION SHEET
OiESTER 2014 PPT R/W 09 OF 13 EAST GOSHEN TOYit-ISl-!IP
~ C5 l;)' C)~ ~ ~~~ -J gs~ -J vi\,._.
I ~ I
).. Cl ~ (§ .... , ~Q::
~l!sl<:!.l:o ~l~D\
'"'"~~ i3" a:: :2
R~Sl:ONS DA TE BY
A EDWARD T MCFALLS 4t LEIGH T MCFALLS UPI #53-4-254
I SANITARY SEWER EASEMENT
!!::
tiQru;
tll ti s
7ii
- 12" 12· 18 WP 0 • EG I[ EG ~N 10" • GRASS GfiRDEN DEC 'f;•
2 STORY BRICK BUILDING
EAST GOSHEN TOWNSHIP
UPI #53-4-77.1
1) TRAFFIC SIGNAL EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, OPERATION, M~NTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A TRAFFIC SIGNAL AND APPURTENANCE THERETO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OYit-IER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR TRAFFIC SIGNAL PURPOSES.
2) SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OYit-IER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
3) TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY THE TOYit-ISHIP.
SURVEY BOOK #201661
RI
A EDWARD T MCFALLS & LEIGH T MCFALLS
UPI #53-4-254 I
LEGEND ~ PROPOSED BITUMINOUS WIDENING/ ~ PAVEMENT RESTORATION
. .
PROPOSED DRIVEWAY ADJUSTMENT
PAOLI PIKE ASSOC/A TES, LP
UPI #53-4-43
42
PENNSYLVANIA DEPT OF TRANSPORTA nDN
BM 16 El.EV. 401 .43 27.64' LT STA. 1165+02.0B SQUARE CUT ON TOP OF CURB
DRl~WAY
COUNTY ROUTE SECTION SHEET
QiESTER 2014 PPT R/W 10 Of 13 EAST GOSHEN TOWNSHIP
RE\1SIONS DATE BY
SR 2014 Pl STA 1167+26.77
fl= 00'08'42" LT D = NO CURVE
I PASQUALE
D'ABUNDO
AND CONCETTA D'ABUNDO REVOCABLE
TRUST UPI #53-4-47
l.. I l I ,/ ~ I
9? I
~-----l--...J/;..----/----....:.s==:=::::~~t::-;;~~~~~~~S.~U~H';;/;::::;:;~~~~~~~~~~~~~~~~-~-~di~~:=;::=;::::;:~s~===G~R=A~S~S===:::=:::::~s;::::;::;::::-~-~-~~~r===:!;;;,,~~~~~~~ ~~~~~~ ~~~~~~~~Th~oF~VfMYNf~~~
CONG CURB
LEGAL RIGHT-OF-WAY
LINE
~~~~15"2if~~~~="' d'
1r~ CONG CURB
:JL"" A ~
~ 2 STORY BRICK •
EAST GOSHEN TOWNSHIP
UPI #53-4-78.1
BUILDING
D SHARED USE PATH
-x- PROlECTIVE RAILING
x REMOVE EXISTING TREE/SHRUB
0 SCALE
25 50 FEET
I
I I
tiQIES;
@
KEYSTONE ANANCIAL BANK
UPI #53-4-78.2
1) SIDEWALK EASEMENT. AN EASEMENT FOR lHE CONSTRUCTION, INSPECTION, MAINlENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. lHE EASEMENT SHALL NOT PREVENT lHE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
2) lEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLElED, UNLESS SOONER RELINQUISHED IN v.RITING BY THE TOWNSHIP.
SURVEY BOOK #201661
-1-------1
@
PASQUALE D'ABUNDO AND CONCETTA D'ABUNDO
CO- TRUSTEES UNDER Tl-IE CONCETTA D'ABOUNDO REVOCABLE TRUST
UPI ;153-4-47
CONC C
I I
BENTLY FAMILY LIMITED
PARTNERSHIP I, LP
UPI #53-4-48.2
1-t-+-~~P-IT~ -~~~--<~~-G G~~~~~~~ r-~~~-tt--.!c-~ ~~~~~~~
@
KEYS TOM
RNANCIALI
BANK UPI #53 -4-78.2
PAOLI PIKE
®
CARROLL E SINQUETT AND CHRISTINE M SINQUETT
UPI #53-4-79
LEGEND
GRASS
P'77'7,1 PROPOSED BITUMINOUS WIDENING/ ~PAVEMENT RESTORATION D SHARED USE PATH
- x- PROTECTIVE RAILING PROPOSED DRIVEWAY ADJUSTMENT
X REMOVE EXISTING TREE/SHRUB
GRASS ii C~~flRT I \ Tg MH TOP) REQUIRED I SIDEWALK Mfffl EASEMENT
STOPS
BITUMINOUS
PAVING
@
TRENCH DRAIN
TO BE RECONSTRUCTED
Tl-IORNDALE INVESTMENT GROUP
UPI # 53-4-80.1
0 SCALE
25
COUNTY ROUTE SECTION SHEET
OiESTER 2014 PPT R/W 11 OF 13 BM #1 ELEV. 414069 29.59' LT STA. 1171+78.07 SQUARE CUT ON TOP Of CURB
TOPMAL LLC UPI #53-4-80
50 FEET
I I
KALEMJIAN INC UPI #53-4-49
LIMIT OF AUTHORIZATION STATION 1173+04.86 SEGMENT 0060 OFFSET 2768 SR 2014 SECTION PPT R/W -1. EAST GOSHEN TOv.t-ISHIP
~'>:" CHESTER COUNTY ~ I LEGAL / cy I RIGHT-L//fE-WAY
-=:.TB"R?:P-
G~~~~~-+-~ G OMH
ti
Pl STA 1174+08.12
t, = 00'11 '08" RT D = NO CURVE
1) SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY Ov.t-IER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
2) TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY THE TOv.t-ISHIP.
SURVEY BOOK #201661
EAST GOSHEN TOv.t-ISHIP
RE'llSK>NS DATE BY
JESSE W COX, N WALTER SUPPLEE, J. RUSSELL HICKE, & JOHN V NOLAN, TRUSTEES OF
Tl-IE GOSHEN MONTl-ILY
MEETING CEMETERY
UPI , 53-4-87
DISTRICT! COUNTY I ROUTE SECTION I SHEET s-o I CHESTER I 2014 PPT R/W I 12 OF 13 EAST GOSHEN TOWNSHIP
'o.\',l'.~"'111 RE\ISIONS I DATE I BY RIGHT-OF-WAY CLAIM INFORMATION RIGHT·OF·WA Y CLAIM INFORMATION I I I
EAST GOSHEN TOWNSHIP EAST GOSHEN TOWNSHIP I I I
STATE RTE. 2014 SEC. NO. PPT R /W EAST GOSHEN IOWNSHIE' CHE SIER COUNTY STATE RTE. 2014 SEC. NO. PPT R /W EAST GOSHEN IOWNSHIP CHESTER COUNTY PARCEL NO. 3 SHEET NO. 4 CLAIM NO. PARCEL NO. 14 SHEET NO. 6 & 7 CLAIM NO. PROPERTY OWNERCSJ PARSQ!:!S 1336 Lt.C PROPERTY OWNERCSJ E'AOLI BEALD'. E'ARlliEBS. l..E'. GRANTORCSJ BRA!:!DYWl!:!E OE'ERATING PARTNERSHIP, LP. GRANTORCSJ PAOLI BOO! COMPANY LP.
AREAS ACRES REQUIRED AREA ACRES/SQ FT AREAS ACRES REQUIRED AREA ACRES/SQ FT DEED BOOK 8834 DEED 4.157 TRAFFIC SIGNAL EASEMENT 0. 031 /1,365 DEED BOOK 4112 DEED 3.000 TRAFFIC SIGNAL EASEMENT 0.02911.257 PAGE 910 CALCULATED SIDEWALK EASEMENT o.256L11.113 PAGE 1285 CALCULATED DATE OF DEED 10L16L2013 ADVERSES TEii' CONST ESMT o.o93L4.057 DATE OF DEED 08L20t'J998 ADVERSES DATE OF RECORD 10L24L2013 LEGAL R/W 0.000 DATE OF RECORD 09L02ll998 LEGAL R/W 0.000 CONSIDERATION 11.00 EFFECTIVE 4.157 CONSIDERATION $2,000.000.00 EFFECTIVE 3.000 TAX STAMPS TOTAL REQ'D R/W OOQO VERIFICATION DATE Jllt:! 3 ZOlZ TAX STAMPS TOTAL REQ'D R/W O,OOQ VERIFICATION DATE JAi:! 3, ZOJZ TOTAL RESIDUE 4.157 DRAWN BY McMoboa {lssgc TOTAL RESIDUE 3.000 DRAWN BY McMahga {Issac RESIDUE LT SCALE 25' 0 25' RESIDUE LT SCALE 25' 0 25' RESIDUE RT RESIDUE RT
RIGHT-OF· WAY CLAIM INFORMATION RIGHT·OF·WA Y CLAIM INFORMATION EAST GOSHEN TOWNSHIP EAST GOSHEN TOWNSHIP
STATE RTE. 2014 SEC. NO. PPT RLW EAST GOSHEN TOWNSHIP CHESTER COUNTY STATE RTE. 2014 SEC. NO. PPT R/W EAST GOSHEN TOWNSHIP CHESTER COUNTY PARCEL NO. 4 SHEET NO. 4 & 5 CLAIM NO. PARCEL NO. 15 SHEET NO, 6 7 & 8 CLAIM NO. ALL PROPERTIES ARE PLOTTED FROM THE DEED OF PROPERTY OWNERCS) PARSQNS RENTAL IV PROPERTY OWNERCSJ GOSHEN EQUITIES, LLC RECORD, RECORDED SUBDIVISION OR LOT PLANS, OR GRANTORCSJ QOMM!.!t:!IQllIIQ!:!S IESI QESl!,ZN, lt:!Q. GRANTORCSJ SAFEWAY. lt:!Q. FROM FIELD SURVEY. PROPERTY LINES WERE SURVEYED ONLY WHEN DETERMINED NECESSARY BY AREAS ACRES REQUIRED AREA ACRES/SQ FT AREAS ACRES REQUIRED AREA ACRES/SQ FT THE PROFESSIONAL LAND SURVEYOR RESPONSIBLE DEED BOOK 1538 DEED NONE LISTED SIDEWALK EASEMENT o.186L8 081 DEED BOOK 6299 DEED 11.033 SIDEWALK EASEMENT o.524L22,831 FOR THE PROJECT. PROPERTY LINES NOT
PAGE 247 CALCULATED 4.593 TEMP CONST ESMT o.105L4,578 PAGE 1938 CALCULATED TEMP CONST ESMT 0.632L27,510 ESTABLISHED BY FIELD SURVEY WERE PLOTTED BASED
DATE OF DEED 3L11 L1999 ADVERSES DATE OF DEED 9L22L2004 ADVERSES 7.051 ON EXISTING TOPOGRAPHICAL FEATURES AND LIMITED
DATE OF RECORD 4L06L1999 LEGAL R/W 0.000 DATE OF RECORD 10L06L2004 LEGAL R/W 0.000 FIELD DATA.
CONSIDERATION $2,500,000.00 EFFECTIVE 4.593 CONSIDERATION $4,700,000.00 EFFECTIVE 3.982 TRAFFIC SIGNAL EASEMENT. AN EASEMENT FOR THE TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 CONSTRUCTION, INSPECTION, OPERATION, TOTAL RESIDUE 4.593 DRAWN BY McMahon Assoc TOTAL RESIDUE 3.982 DRAWN BY McMahon Assoc MAINTENANCE, REPAIR, RECONSTRUCTION AND RESIDUE LT SCALE 25' 0 25' RESIDUE LT SCALE 25' 0 25' ALTERATION OF A TRAFFIC SIGNAL AND RESIDUE RT RESIDUE RT APPURTENANCE THERETO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR TRAFFIC SIGNAL PURPOSES. RIGHT-OF-WAY CLAIM INFORMATION RIGHT·OF·WAY CLAIM INFORMATION EAST GOSHEN TOWNSHIP EAST GOSHEN TOWNSHIP SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, STATE RTE. 2014 SEC. NO. PPT R IW EAST GOSHEN TOWNSHIP CHESTER COUNTY STATE RTE. 2014 SEC. NO. PPT R LW EAST GOSHEN TOWNSHIP CHESTER COUNTY RECONSTRUCTION AND ALTERATION OF A SIDEWALK.
PARCEL NO. 6 SHEET NO. 5 & 6 CLAIM NO. PARCEL NO. 17 SHEET NO. 8 CLAIM NO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY
PROPERTY OWNERCSJ GOSHEN EXECUI!VE CONDOMINIUM ASSOCIATION PROPERTY OWNERCS> COMMERCE BANKLPENNSYLVANIA, N.A. OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR GRANTORCSJ GOSHEN REALY PABTNERS GRANTORCSJ SAFEWAY INC. SIDEWALK PURPOSES.
AREAS ACRES REQUIRED AREA ACRES/SQ FT AREAS ACRES REQUIRED AREA ACRES/SQ FT TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT DEED BOOK 1238 DEED 6.902 REQUIRED R/W <TWP> o.o40L1.128 DEED BOOK 6299 DEED 2.044 TRAFFIC SIGNAL EASEMENT 0.03U1 403 TO USE THE LAND AS NECESSARY DURING PAGE 312 CALCULATED SIDEWALK EASEMENT 0.208L9,082 PAGE 1967 CALCULATED SIDEWALK EASEMENT o.01BL768 CONSTRUCTION OF THE PROJECT. THE EASEMENT IS DATE OF DEED 6L04LH!68 ADVERSES TEMP CONST ESMT Q.QZ2l'll68 DATE OF DEED llLZ2aoo1 ADVERSES TEMP CONST ESMT oo56LZ.15Z REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK DATE OF RECORD 8L01L1988 LEGAL R/W 0.408 DATE OF RECORD 10L06L2004 LEGAL R/W 0.109 INDICATED BY THE PLANS IS COMPLETED, UNLESS CONSIDERATION EFFECTIVE 6.494 CONSIDERATION $2,100,000.00 EFFECTIVE 1.935 SOONER RELINQUISHED IN WRITING BY THE TOWNSHIP. TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 TOTAL RESIDUE 6.494 DRAWN BY McMahon Assoc TOTAL RESIDUE 1.935 DRAWN BY McMahon Assoc BUILDINGS AND STRUCTURES MARKED lQ:) HAVE BEEN RESIDUE LT SCALE 25' 0 25' RESIDUE LT SCALE 25' 0 25' OR ARE TO BE REMOVED OR ALTERED BY THE RESIDUE RT RESIDUE RT DEPARTMENT OR OTHER AUTHORITY RESPONSIBLE FOR THE PAYMENT OF PROPERTY DAMAGES.
RIGHT·OF·WAY CLAIM INFORMATION RIGHT·OF·WA Y CLAIM INFORMATION EAST GOSHEN TOWNSHIP EAST GOSHEN TOWNSHIP
STATE RTE. 2014 SEC. NO. PE'T B LW. EASI GQSl:lEN TOWNSl:llP Cl:lESIEB COUNTY STATE RTE. ZOH SEC. NO. E'PT B /W EAST GQSl:lEN IOWNSHIE' Cl:lESIER COUNTY PARCEL NO. 8 SHEET NO. 5 &; 6 CLAIM NO. PARCEL NO. 23 SHEET NO. Q CLAIM NO. PROPERTY OWNERCSJ SU!:!OCO, INC. PROPERTY OWNER<&> WEST CHESTER AREA SCHOOL DISTRICT GRANTORCSJ SUNOCO LLC. GRANTORCSJ TOWNSHIP OF EAST GOSHEN
AREAS ACRES REQUIRED AREA ACRES/SQ FT AREAS SQ. FT. REQUIRED AREA SQ. FT. DEED BOOK 9046 DEED NONE LISTED TRAFFIC SIGNAL EASEMENT 0.015 L652 DEED BOOK 3761 DEED 2896 SIDEWALK EASEMENT 178 PAGE 732 CALCULATED 1.156 SIDEWALK EASEMENT o.o93L4,o5o PAGE 447 CALCULATED TEMP CONST ESMT 65 DATE OF DEED 10L29L2014 ADVERSES TEMP CONST ESMT o.o54L2.338 DATE OF DEED 5L17 L1994 ADVERSES DATE OF RECORD l Ll6LZ015 LEGAL R/W Q,201 DATE OF RECORD 5LZ5Llllll4 LEGAL R/W 331 CONSIDERATION 110.00 EFFECTIVE 0.952 CONSIDERATION 11.00 EFFECTIVE 2 562 TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 TAX STAMPS TOTAL REQ'D R/W 0 VERIFICATION DATE JAN 3, 2017 TOTAL RESIDUE 0.952 DRAWN BY McMahon Assa TOTAL RESIDUE 2 562 DRAWN BY McMahon Assoc RESIDUE LT SCALE 25' 0 25' RESIDUE LT SCALE 25' 0 25' RESIDUE RT RESIDUE RT
OISlRICTI COUNTY I ROUTE SECTION I SHEET 6-o I CHESTER I 2014 PPT R/W I 13 OF 13 EAST GOSHEN TOWNSHIP RIGHT·OF·WA Y CLAIM INFORMATION 'N'f·'Mil!1! I RE\1SIONS I DATE I BY
EAST GOSHEN TOWNSHIP I I I I I I STATE RTE. 2014 SEC. NO. PPT R /W EAST GOSHEN TOWNSHIP CHESIER COUNTY PARCEL NO. 24 SHEET NO. 9 & 10 CLAIM NO. PROPERTY OWNERCSJ KEYSTONE EINAt,!CIAL BANK M.A. GRANTORCSJ KE)'.STOME BAM~. M.A.
AREAS ACRES REQUIRED AREA AC/SQ FT DEED BOOK 1691 DEED 1.121 SIDEWALK EASEMENT 0.065[2 852 PAGE 2376 CALCULATED TEMP CONST ESlllT 0.042[1,832 DATE OF DEED 9L30£'.1999 ADVERSES DATE OF RECORD 12L29t'1999 LEGAL R/W 0.129 CONSIDERATION 11.00 EFFECTIVE 0.995 TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 TOTAL RESIDUE 0,99~ DRAWN BY McMgbga 1\§§Q' RESIDUE LT SCALE 25' 0 25' RESIDUE RT
RIGHT-OF-WAY CLAIM INFORMATION
EAST GOSHEN TOWNSHIP
STATE RTE. 2014 SEC. NO. PPT R LW EASI GOSHEN TOWNSHIP CHESTER COUNTY PARCEL NO. 26 SHEET NO. 10 CLAIM NO. PROPERTY OWNERCSJ CARROLL E. SINQUETT, Ill AND CHBISTINE M. SINQUETT ALL PROPERTIES ARE PLOTTED FROM THE DEED OF GRANTORCSJ CARROLL E. SINQUETT, Ill AND CYNTHIA E BORTLE, EXECUIBIX OF Il:lE ESTATE OF RECORD, RECORDED SUBDIVISION OR LOT PLANS, OR QllBBQLI.. E. Slf'lQUETT. JR A~ll QABBQl.I. E. SltlQUETT. OEQEASEQ FROM FIELD SURVEY. PROPERTY LINES WERE SURVEYED ONLY WHEN DETERMINED NECESSARY BY AREAS ACRES REQUIRED AREA AC/SQ FT THE PROFESSIONAL LAND SURVEYOR RESPONSIBLE DEED BOOK 9461 DEED 1.000 TEMP CONST ESlllT o.o40L1.737 FOR THE PROJECT. PROPERTY LINES NOT
PAGE 733 CALCULATED ESTABLISHED BY FIELD SURVEY WERE PLOTTED BASED
DATE OF DEED 10Lo5L2016 ADVERSES ON EXISTING TOPOGRAPHICAL FEATURES AND LIMITED
DATE OF RECORD 12L21L2016 LEGAL R/W 0.140 FIELD DATA.
CONSIDERATION 11.00 EFFECTIVE 0.860 TRAFFIC SIGNAL EASEMENT. AN EASEMENT FOR THE TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 CONSTRUCTION, INSPECTION, OPERATION, TOTAL RESIDUE 0.860 DRAWN BY McMahon Assoc MAINTENANCE, REPAIR, RECONSTRUCTION AND RESIDUE LT SCALE 25' 0 25' AL TERA TION OF A TRAFFIC SIGNAL AND
RESIDUE RT APPURTENANCE THERETO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR TRAFFIC SIGNAL PURPOSES. RIGHT-OF-WAY CLAIM INFORMATION
EAST GOSHEN TOWNSHIP SIDEWALK EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, STATE RTE. 2014 SEC. NO. PPT R LW EAST GOSHEN TOWNSHIP CHESTER COUNTY RECONSTRUCTION AND AL TERA TION OF A SIDEWALK.
PARCEL NO. 28 SHEET NO. 10 CLAIM NO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY
PROPERTY OWNERCSJ THORNDALE INVESTMENT GROUP OWNER FROM MAKING ANY LEGAL USE OF THE AREA
GRANTORCSJ CHESTER COUNTY FEDERAL SAVINGS AND LOAN ASSOCIATION WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
AREAS ACRES REQUIRED AREA AC/SQ FT DEED BOOK M47 DEED 0.997 SIDEWALK EASEMENT o.020L891 TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT
PAGE 317 CALCULATED TEMP CONST ESlllT 0.041A792 TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS DATE OF DEED 2Ll2Ll9Z6 ADVERSES REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK DATE OF RECORD U19L1976 LEGAL R/W 0.102 INDICATED BY THE PLANS IS COMPLETED, UNLESS CONSIDERATION $50 000.00 EFFECTIVE 0.895 SOONER RELINQUISHED IN WRITING BY THE TOWNSHIP. TAX STAMPS TOTAL REQ'D R/W 0.000 VERIFICATION DATE JAN 3, 2017 TOTAL RESIDUE 0.895 DRAWN BY McMahon Assoc BUILDINGS AND STRUCTURES MARKED [QI HAVE BEEN RESIDUE LT SCALE 25' 0 25' OR ARE TO BE REMOVED OR ALTERED BY THE
RESIDUE RT DEPARTMENT OR OTHER AUTHORITY RESPONSIBLE FOR THE PAYMENT OF PROPERTY DAMAGES.
RIGHT·OF·WA Y CLAIM INFORMATION
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
STATE RTE. 2014 SEC. NO. PPT B LW El\SI GOStlEM TOWNStllP QHESIEB COUNTY PARCEL NO. 30 SHEET NO. 10 CLAIM NO. PROPERTY OWNERCSJ REDEEMED PROPERTIES, L.P. GRANTORCSJ RONALD D. INVERSO
AREAS SQ. FT. REQUIRED AREA SQ, FT. DEED BOOK 6849 DEED SIDEWALK EASEMENT 2 519 PAGE 314 CALCULATED 26,§29 TEMP CONST ESlllT 2,866 DATE OF DEED 5L18[2oo6 ADVERSES DATE OF RECORD 5[23[2006 LEGAL R/W IQ.97Z CONSIDERATION 1600,000.00 EFFECTIVE 15852 TAX STAMPS TOTAL REQ'D R/W 0 VERIFICATION DATE JAN 3, 2017 TOTAL RESIDUE 15,852 DRAWN BY McMahon Assa RESIDUE LT SCALE 25' 0 25' RESIDUE RT
6i 0-692-7i 7i
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY i580 PAOLI PIKE, WEST CHESTER, PA i9380-6i99
January 8, 2018
To: Board of Supervisors
From: MarkMiller
Re: Group Bids 2018
We have solicited bids for all groups. On January 8, 2018 at lO:OOam all group bids were opened.
The results are as follows:
Fuel Reilly & Sons Inc.
89 Octane Gas & Diesel Fuel $20,700.00
We recommend that Reilly & Sons Inc. be awarded the bid for fuel
Soda Ash Soda Ash Main Pool and Chemical Co. $7,872.00 USALCO,LLC George S. Coyne Chemical $9,050.40 Univar USA Inc. $9,600.00
Alum. $20,440.00
$24,458.00 $47,320.00
Total $28,312.00 No Bid $33,508.40 $56,508.40
We recommend that Main Pool and Chemical Co. be awarded the bid for soda ash and Alum.
Rental Equip. w/Operators
S.A. Macanga
Total Price $232,800.00
We recommend that S.A. Macanga be awarded the bid for Rental Equipment with operators.
F:\Data\Shared Data\Public Works Dept\Bids\Group Bid l-Vl\2018\Letter to BOS for awarded bids Jan. 8, 2018.doc
BOARD OF SUPERVISORS EAST GOSHEN TOWNSHIP
Rental Equip. without Operators Weekly Blue Line Rental, LLC $9,165.00 Giles & Ransome $9,250.00
Monthly $19,830.00 $25,016.00
Blue Line Rental, LLC does not include delivery and Pick up charges and they are unable to provide the hammer or planer attachment for the skid steer. Blue Line Rental does not meet the specs . We recommend that Giles & Ransome be awarded the bid for rental equipment without operators.
Signs and Posts Garden State Highway Products, Inc. U.S. Municipal Supply Inc.
Total Bid $5,701.65 $10,176.50
We recommend that Garden State Highway Products, Inc. be awarded the bid for signs and posts.
F:\Oata\Shared Data\Public Works Dept\Bids\Group Bid l-Vl\2018\letterto BOS for awarded bids Jan. 8, 2018.doc
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 1/11/2017 To:
From: Re:
Board of Supervisors // Mark Gordon, Township Zoning Officer ~ SWM Operation and Maintenance Agreements
Dear Board Members:
I have the following Storm water management Operation and Maintenance Agreements for the Board's approval.
SWM Operation Agreement:
1551 Colonial Ln. 907 Madison Dr.
Draft Motion: I move that we authorize the Chairman to execute the storm water management operation and maintenance agreements for 1551 Colonial Ln. and 907 Madison Dr.
F:\Data\Shared Data\Code Dept\Storm Water Managmeent O&M Agreements\2018\Memo to BOS 01112018.doc
1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS ANNUAL REORGANIZATION MEETING 3 1580 PAOLI PIKE 4 TUESDAY, JANUARY 2, 2018 5 DRAFT MINUTES 6 7 8 9 Present: Chairman Marty Shane; Vice Chairman Carmen Battavio; Supervisors 10 David Shuey, Janet Emanuel and Mike Lynch; Township Manager Rick Smith; 11 Finance Director Jon Altshul; Conservancy Board Chairman Erich Meyer. 12 13 Call to Order & Pledge of Allegiance 14 Marty called the meeting to order at 6:00 p.m. and asked Ron Cocco to lead the 15 pledge of allegiance. 16 17 Moment of Silence 18 Carmen called for a moment of silence to honor our troops. 19 20 Recording 21 None. 22 23 Swearing In of Mike Lynch and David Shuey 24 Judge Tom Tartaglia administered the oath of office to newly elected Supervisors Mike 25 Lynch and David Shuey. David thanked his supporters. 26 2 7 Re-Organization Actions: 28 a. Elect Chairman (Resolution 2018-1): Carmen motioned to elect Marty as 29 Chairman of the Board. Janet seconded. The Board voted unanimously in favor 3 0 of the motion. 31 b. Elect Vice Chairman (Resolution 2018-2): Janet motioned to elect Carmen as 32 Vice Chairman of the Board. Mike seconded. The Board voted unanimously in 3 3 favor of the motion. 34 c. Auuoint Police Commissioner (Resolution 2018-3): Carmen motioned to 35 appoint Janet Emanuel Police Commissioner. Mike seconded. The Board voted 36 unanimously in favor of the motion. 37 38 d. Appoint Township Officials (Resolution 2018-4): 3 9 Carmen made a motion to appoint the following Township officials for 2018: 40 • Township Manager/Secretary/Assistant Zoning Officer-Louis F. Smith, Jr. 41 • Finance Director/Treasurer - Jon Altshul 4 2 • Director of Public Works - Mark Miller 43 • Director of Code Enforcement/Zoning Officer/Building Code Official/Noise 44 Control Officer - Mark Gordon 45 • Building Inspectors - Gary Althouse & Vincent DiMartini 46 • Fire Marshal - Carmen R. Battavio
1/2/18 January 2, 2018 1
1 • Assistant Fire Marshals -Mark Miller, Gaiy Althouse & Vincent DiMartini 2 • Township Solicitor - Buckley, Brion, McGuire & Morris 3 • Township Engineer-Pennoni Associates 4 • Emergency Management Coordinator - Kevin Miller 5 • Assistant Emergency Management Coordinator - Michael Holmes 6 • Delegate to the Chester County Tax Collection Committee - Jon Altshul 7 • Alternate Delegate to the Chester County Tax Collection Committee - Brian 8 McCool 9 • Deputy Tax Collector - Brian McCool 10 11 Mike seconded the motion. The motion passed unanimously. 12 13 e. Re-Appoint Township Employees (Resolution 2018-5): 14 Marty made a motion to re-appoint all Township employees. Carmen seconded 15 the motion. The motion passed unanimously. 16 17 f. Appoint Township Depositories for Township Funds (Resolution 2018-6): 18 Marty made a motion to appoint the following depositories of Township funds 19 and authorize the Director of Finance/Treasurer to make investments at banks 2 0 paying the best rate of interest and at the best terms: 21 22 • DNB Bank 2 3 • Fulton Bank 24 • Citadel Bank 2 5 • WSFS Bank 26 • PLGIT-PA Local Government Trust and Plus (Custodian Wells Fargo NA) 27 • M&TBank 28 • Meridian Bank 29 30 Janet seconded the motion. The motion passed unanimously. 31 32 g. Certify Delegates to the PSATS Convention (Resolution 2018-7): 33 Marty made a motion to certify the five Supervisors, the Township Manager and 34 the Director of Finance/Treasurer as delegates to the 2018 PSATS Convention, 3 5 with Rick Smith as the Voting Delegate and Jon Altshul as the Alternate Voting 36 Delegate. Mike seconded the motion. The motion passed unanimously. 37 38 h. Confirm 2018 Holiday Schedule (Resolution 2018-8: 3 9 Marty made a motion to approve the 2018 Holiday Schedule. Janet seconded. The 40 motion passed unanimously. 41 42 i. Confirm 2018 Meeting Schedule (Resolution 2018-9): Marty made a motion to 43 approve the 2018 Meeting Schedule. The Board of Supervisors will meet on the 1st 44 and 3rd Tuesday and only meet as needed on the 2nd, 4th and 5th Tuesday of each 45 month. Janet seconded. The motion passed unanimously.
1/2/18 January 2, 2018 2
1 J. Confirm Keystone Collection Agency is the Earned Income and Local Services 2 Tax Collector for the Township (Resolution 2018-10) 3 Marty made a motion to confirm the Keystone Collection Agency as the Earned 4 Income and Local Services Tax Collector for 2018. Carmen seconded. The 5 motion passed unanimously. 6 7 k. Consider Maillie, LLP. As independent auditor for the Township (Resolution 8 2018-11) 9 Marty made a motion to confirm Maillie, LLP as the Township's independent 10 auditor for 2018. Mike seconded. The motion passed unanimously. 11 12 1. Establish Public Safety Boundaries (Resolution 2018-12) 13 Kim Holman from Good Fellowship Ambulance Company and Tammy Johnson 14 from Malvern Fire Company were present and expressed support for the proposed 15 Advanced Life Support service boundaries now that Medic 91 is going out of 16 business and will no longer be covering East Goshen. Carmen made a motion to 17 approve the Public Safety Boundaries for East Goshen Township. Mike seconded. 18 The motion passed unanimously. 19 20 m. Establish the 2018 Fee Schedule (Resolution 2017-34) 21 Rick noted that the 2018 Fee Schedule was updated to include the $10 22 administrative charge every three years for residents with on-lot septic systems. 23 Marty made a motion to approve the 2018 Fee Schedule. Mike seconded. The 24 motion passed unanimously. 25 26 n. Authorize participation in the Municipal Risk Management Workers' 27 Compensation Pooled Trust (Resolution 2017-65) 28 Marty made a motion to authorize the Township's participation in the Municipal 29 Risk Management Workers' Compensation Pooled Trust. Carmen seconded. The 30 motion passed unanimously. 31 32 o. Acknowledge that Jon Altshul has been elected and sworn in as the Tax 33 Collector 34 Marty acknowledged that Jon has been elected and sworn in as the Tax Collector. 35 36 p. Announce the Continuance of all other Applicable Resolutions that were 37 previously adopted 38 Marty announced that all other applicable resolutions that were previously 3 9 adopted will be continued. 40 41 Chairman's Report 42 Marty announced that the annual planning sessions with the ABC groups will be 43 held on Saturday, January 6th at 8:00am and that the Board will meet at the 44 conclusion of this meeting in Executive Session to discuss a legal and personnel 45 matter. 46
1/2/18 January 2, 2018 3
1 Goshen Fire Company Report 2 Carmen reported that the Goshen Fire Company had 32 fire calls, 211 ambulance 3 calls and 14 fire police calls in November in East Goshen. 4 5 East Goshen Residents Received Belated Purple Heart Medal 6 Marty reported that Rep. Ryan Costello had recently awarded a Purple Heart to 7 Private Justin Radbill, an East Goshen resident, related to his service in Iraq in 2003. 8 The military held a ceremony for Private Radbill at that time, but he never received 9 his actual medal. Carmen suggested that Rick reach out to Mr. Radbill to gauge his 10 interest in being honored at a future Township meeting. 11 12 Consider ABC Appointments 13 Carmen made a motion to appoint the following residents to ABC groups: 14 • Brad Giresi to the Planning Commission for a 4 year term 15 • Jim McRee to the Planning Commission for a 4 year term 16 • John Snyder, Esquire to the Zoning Hearing Board for a 3 year term 17 • Dana Pizarro, PE to the Municipal Authority for a 5 year term 18 • Sandy Snyder, Esquire to the Conservancy Board for a 3 year term 19 • Andy Tyler to the Conservancy Board for a 3 year term 20 • Kishor Thakarar to the Park and Rec Commission for a 5 year term 21 • Chuck Proctor, Esquire to the Historical Commission for a 5 year term 22 • Bill Smith, CFA to the Pension Committee 23 • Thom Clapper to the Vacancy Board 24 25 Janet seconded the motion. The motion passed unanimously. 26 2 7 Consider Resolution 2 018-72-PennDOT Casting Agreement 28 Rick explained that as part of PennDOT's plan to pave North Chester Road, it would 29 like to enter into an agreement to adjust four sanitary sewer manholes. Janet made a 30 motion to approve Resolution 2018-72, a master agreement for casting adjustments. 31 Carmen seconded. The motion passed unanimously. 32 33 Consider Resolution 2018-58-PennDOT Mowing Agrement 34 Marty made a motion to approve the PennDOT Mowing Agreement. Janet seconded. 3 5 The motion passed unanimously. 36 37 Consider Escrow Release for 1662 East Boot Road 38 Mike made a motion to approve an escrow release of $59,337.18 for 1662 East Boot 39 Road, as recommended by Mark Miller and the Township Engineer, to bring the 40 balance on the account to $0. Janet seconded. The motion passed unanimously. 41 42 Consider Stormwater Management Agreement for 632 Marydell Drive 43 Janet made a motion to authorize the Chairman to execute the stormwater 44 management operation and maintenance agreement for 632 Marydell Drive. 45 Carmen seconded. The motion passed unanimously.
1/2/18 January 2, 2018 4
1 Any Other Matter 2 Rick explained that the Apple brook Golf Course was moving ahead with its golf 3 learning center and that all the conditions listed in the land development plan 4 approved on November 14th had been satisfactorily addressed, according to our 5 engineer. Carmen made a motion to authorize the Board to execute the final plans 6 and escrow documents for Applebrook Golf Course's Learning Center. Janet 7 seconded. The motion passed unanimously. 8 9 Marty made a motion to authorize the Chairman to sign a certificate affirming the 10 tax collector's bond. Mike seconded. The motion passed unanimously. 11 12 Approval of Minutes of December 19. 2017 13 Carmen made a motion to approve the minutes of December 19th, as corrected. 14 Marty seconded. The motion passed 5-0. 15 16 Treasurer's Report of December 28. 2017 17 Jon noted that the $19,862 payment to TD Ameritrade for the Police Pension Plan in 18 Batch 4 had been voided after the Treasurer's report was prepared, based on a 19 discussion at the last Police Commission meeting. He stated that an updated 20 expenditure would be processed for the next BOS meeting. Carmen moved to 21 graciously accept the Treasurer's Report and the Expenditure Register Report as 22 recommended by the Treasurer, to accept the receipts and to authorize payment of the 23 invoices just reviewed, with the exception of $19,862 payment to TD Ameritrade. Mike 24 seconded. The motion passed 5-0. 25 26 Correspondence, Reports of Interest 27 The Board acknowledged the following correspondence and reports of interest: 28 • December 16, 2017 letter from Governor Tom Wolfe regarding Resolution 29 2017-170 30 • December 20, 2017 Paoli Pike Trail Project Update 31 • December 13, 2017 Park Usage Report 32 • 2017 Department of Parks and Recreation Year End Report 33 34 Mike asked Rick to speak with Ed McFalls about the viability of a dog park in 35 Hershey's Mill Villages. 36 37 The Board discussed the creation of a pond committee or multiple pond committees 38 to discuss implementation of the National Lands Trust recommendations. Carmen 39 asked Rick to send out a Constant Contact message asking for volunteers. 40 41 Public Comment 42 Joe Buonanno, 1606 Herron Lane, made a comment about the Bow Tree ponds. Joe 43 asked if the Township was considering levying a stormwater tax or fee. Jon 44 responded that this issue was discussed at the budget planning meeting in May and 45 that there is no compelling reason for the Township to do so in the near future.
1/2/18 January 2, 2018 5
1 2 Keith Dickerson, 1212 Culbertson Circle, asked for demographic information about 3 the Township. Jon promised to send him a copy of the Comp Plan that contains this 4 information. 5 6 Adjournment 7 There being no further business, Janet motioned to adjourn the meeting at 7:30 pm. 8 Carmen seconded the motion. The motion passed 5-0. 9 10 Respectfully submitted, 11 ]on Altshul 12 Recording Secretary 13 14 Attachments: December 28, 2017 Treasurer's Report 15
1/2/18 January 2, 2018 6
December 28, 2017
TREASURER'S REPORT 2017 RECEIPTS AND BILLS
!GENERAL FUND
'·· ... --·--
rRealE:siate Tax $1,631.66 Accounts Payable $593,792.97 Earned Income Tax $18,500.00 Electronic Pmts: Local Service Tax $0.00 Credit Card $7,136.37 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $0.00 Debt Service $0.00 Total Other Revenue $959,247.86 Payroll $118 343.11 Total Receipts: $979,379.52 Total Expenditures: $719,272.45
!STATE LIQUID FUELS FUND I
'--- .. ~·- .. ·--·\
Receipts $0.00 Interest Earned $0.00 Total State Liqud Fuels: $0.00 Expenditures: $530,872.51
!SINKING FUND
Receipts $350,698.84 Accounts Payable $187.48 Interest Earned $0.00 Credit Card $188.88 Total Sinking Fund: $350,698.84 Total Expenditures: $376.36
!TRANSPORTATION FUND
i
Receipts $0.00 Interest Earned $0.00 Total Sinking Fund: $0.00 Expenditures: $0.00
!SEWER OPERATING FUND
Accounts Payable $309,844.97 Receipts $109,941.79 Debt Service $0.00 Interest Earned $0.00 Credit Card $0.00 Total Sewer: $109,941.79 Total Expenditures: $309,844.97
!REFUSE FUND
Receipts $11,827.06 Interest Earned $0.00 Total Refuse: $11,827.06 Expenditures: $30,405.87
IBOND FUND I
Receipts $0.00 Interest Earned $0.00 Total Refuse: $0.00 Expenditures: $0.00
I SEWER SINKING FUND
Receipts $210,816.20 Interest Earned $0.00 Total Sewer Sinking Fund: $210,816.20 Expenditures: $0.00
I OPERATING RE~ERVE FUND I
.Receipts $0.00 'iiiierostEarne'd- $0.00 Total Operating Reserve Fund: $0.00 Expenditures: $0.00
I EVENTS FUND
Receipts $0.00 Interest Earned $0.00 1 Total Operating Reserve Fund: $0.00 Expenditures: $0.00
1/2/18 January 2, 2018 7
December 14, 2017
TREASURER'S REPORT
2017 RECEIPTS AND BILLS
I I GENERAL FUND
Real Estate Tax $2,103.73 Accounts Payable $230,481.39 Earned Income Tax $210,928.35 Electronic Pmts: Local Service Tax $7,524.82 Credit Card $0.00 Transfer Tax $40,966.95 Postage $0.00 General Fund Interest Earned $5,776.30 Debt Service $9,460.82 Total Other Revenue $30,485.94 Payroll $117,774.34 Total Receipts: $297,786.09 Total Expenditures: $357,716.55
!STATE LIQUID F,UELS FUND
Receipts $0.00 Interest Earned $5, 128.49 Total State Liqud Fuels: $5,128.49 Expenditures: $0.00
!SINKING FUND
Receipts $0.00 Accounts Payable $29,763.29 Interest Earned $4,062.02 Credit Card $0.00 Total Sinking Fund: $4,062.02 Total Expenditures: $29,763.29
!TRANSPORTATION FUND I •"
Receipts $0.00 Interest Earned $436.61 Total Sinking Fund: $436.61 Expenditures: $0.00
jSEWER OPERATING FUND
Accounts Payable $55,172.72 Receipts $90, 171.21 Debt Service $28,342.19 Interest Earned $131.36 Credit Card $0.00 Total Sewer: $90,302.57 Total Expenditures: $83,514.91
!REFUSE FUND
Receipts $30,375.84 Interest Earned $19.90 Total Refuse: $30,395.74 Expenditures: $66, 167.71
lsoND FUND
Receipts $0.00 Interest Earned $6,073.55 Total Refuse: $6,073.55 Expenditures: $53,676.57
!SEWER SINKING FUND
Receipts $0.00 Interest Earned $497.35 Total Sewer Sinking Fund: $497.35 Expenditures: $0.00 I OPERATING RESERVE FUND!
Receipts $0.00 Interest Earned $429.39 Total Operating Reserve Fund: $429.39 Expenditures: $0.00
jEVENTS FUND
Receipts $0.00 Interest Earned $3.11 1 Total Operating Reserve Fund: $3.11 Expenditures: $0.00
1/2/18 January 2, 2018 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
EAST GOSHEN TOWNSHIP ANNUAL PLANNING SESSION SATURDAY, JANUARY 6, 2018
DRAFT
The East Goshen Township Board of Supervisors held the Annual Planning Session on Saturday, January 6, 2018 at the Township Building. Those in attendance were:
Board of Supervisors E. Martin Shane, Chairman Carmen Battavio, Vice Chairman Janet Emanuel Michael Lynch David Shuey
Conservancy Board Sandy Snyder, Chairman Walter Wujick Erich Meyer
Futurist Committee Thomas Kilburn
Municipal Authority Ed McAssey, Chairman Jack Yahraes
Park & Recreation Commission Christine Taraborelli, Chairman Daniel Leicht, Vice Chairman
Planning Commission Brad Giresi, Chairman Jim McRee, Vice Chairman Daniel Daley Monica Close Ernest Harkness
Township Staff Rick Smith, Township Manager Mark Miller, Public Works Director Mark Gordon, Zoning Officer Jason Lang, Recreation Director John Altshul,.Director of Finance
Marty Shane opened the meeting at 8:15 am. He introduced the two new Supervisors, Michael Lynch and David Shuey.
Conservancy Board , Sandy Snyder explained that the mission of the Conservancy Board is to preserve the natural resources in East Goshen Township. Their goals are to continue maintenance as follows:
1. Continue invasive species control 2. Continue maintenance of the blue bird houses in Apple brook 3. Develop a maintenance plan for the Serpentine Barren 4. Keep East Goshen Beautiful Day had a good turnout in 2017 5. Maintain the riparian buffer along the creeks 6. Maintain Clymer's Woods. They are 90% done laying woodchips around the trees. They want to clear out the underbrush near the bridge.
7. In 2017 they planted 10 trees along the boardwalk in the historic area. 8. In 2017 a study was done on the 6 ponds in East Goshen. They will review the study and make recommendations to the Board of Supervisors.
Annual Session 1-6-2018 draft 1
1 Sandy thanked Rick, Mark Gordon and especially Mark Miller and the Public Works 2 Department for all of the support they give. She also thanked their liaison Mike 3 Lynch who attends the meetings and helps with plantings. 4 5 Marty explained the pond study and the reason for it. Mike spoke about the mission 6 of the Conservancy Board and the future of streams in the area. Marty introduced 7 the staff members and thanked them for all they do for the Township. 8 9 Futurist Commission 10 Tom Kilburn mentioned the other members of the Commission, Luann Petrellis, Rod 11 Vaughn and, new member, Mike James. He appreciates the guidance they are 12 receiving from Brad Giresi who started attending their meetings a few years ago. He 13 presented the accomplishments/goals the Commission is working on: 14 1. The creation of a much needed "town center" to house specialty shops, 15 restaurants, micro businesses, and central gathering areas. 16 The focus here is through the Paoli Pike Master Plan Committee (PPMPC) which has 17 an objective to develop a vision with visuals and a zoning overlay of the "town 18 center" to guide development in this area. They will focus on ideas to make this area 19 developer friendly and to budget next year for a development consultant to focus 20 activities going forward. 21 2. Clear signage and lighting to highlight the "town center". 22 Focus here again is through the PPMPC, which has an objective to develop a plan for 23 clear signage and streetscape for the town center. 24 3. Amend East Goshen Township bylaws to allow for liquor sales. 25 Several discussions with a Giant project executive have indicated that they may be 26 interested in leading a referendum to accomplish this is EGT, much as they have 27 successfully done in three other dry townships this year, including East Bradford. 28 Giant leading this effort is the easiest way for EGT to move forward at this point. 29 Other options will need to be considered if Giant defers. 30 4. Establish a strategic long-range planning objective with steps outlining how to 31 achieve the objective and the stated benefits to all residents, then adopt a resolution 32 to make it official. 33 A document with several long-range planning objectives was prepared and 34 presented to the Board of Supervisors for adoption in April. The BOS seemed to 35 favor adoption of all items except the renaming of the township to Goshenville but 36 no action was taken. 37 5. Need for a "branding" of the Township to include clear signage that would 38 include renaming the township to "Goshenville". 39 Discussions with the BOS and PPMPC lead to the idea of branding the "Town Center" 40 as "Goshenville" rather than the entire township. Output from the PPMPC now has 41 that idea incorporated in its recommendations. 42 Tom mentioned that two West Chester University professors are working with them 43 to determine how real estate values will be impacted by these changes. Mike Lynch 44 commented that East Bradford put FAQs on their website about LCB licenses. 45 46
Annual Session 1-6-2018 draft 2
1 Municipal Authority 2 Ed McAssey mentioned that the West Goshen Sewer Plant, of which East Goshen 3 Township has a 16.66% interest, is in the process of upgrading the Plant's 4 equipment. The Authority and BOS recently entered into an agreement with West 5 Goshen to address how the improvements will be paid for. The most recent bond 6 issue addressed the funding of the improvements. The members of the Authority 7 have been regularly attending West Goshen Sewer Authority meetings. West 8 Goshen Township is currently undergoing an EPA review to determine its 9 phosphorous limit. This matter is still in federal court. West Goshen has provided 10 the required information to the court. The EPA has asked and been granted several 11 extensions. West Goshen has undertaken a study on what would need to be done to 12 the treatment process if the court establishes a lower phosphorous limit. They (and 13 East Goshen) have funding to construct the required improvements if needed. 14 Ed mentioned that East Goshen will start to reline the tanks at the Ridley Creek 15 Sewer Treatment Plant. He thanked Rick and Mark Miller for all of the work they do 16 to maintain our sewer system. He introduced the Chairman for 2018 Jack Yahraes. 17 Jack mentioned that Ed is moving to Lancaster and thanked him for his 5 years of 18 service. 19 20 Park & Recreation Commission 21 Jason Lang mentioned that this is a 9 member Commission that has accomplished a 22 lot in 2017. All Park Commission accomplishments are shared with the Public 23 Works Department. Public Works work early, late and tirelessly in support of park 24 daily operations and events. In 2017: 25 1. "Fit and Fun" initiative recognized by Gov. Wolf as best health & wellness program 26 in the State. 27 2. EGT was awarded the inaugural GOOD Award by DCNR/PRPS 28 3. Liv Live Concert (Suicide Awareness) awarded PEPS Excellence Award 29 4. Partnered with West Goshen Township to host a successful Bicentennial 30 Celebration. The BC was later named an NRPA Park Champion Finalist, as one of the 31 top four events across the country in 2017!! 32 5. Park Commission member Debbie Snyder single handedly grew the Senior Card 33 Club from a four person/twice monthly meeting to a twenty person/six days a week 34 social party. 35 6. "Big" four events were all well attended. The Food Truck & Music Festival had an 36 estimated 2,500 people, which was 2,000 more than expected. 37 7. Received $565,000 in grants to develop the Milltown Dam Park 38 Jason mentioned the data he collected about how many people use the park and 39 explained how it impacts health. 40 41 Christine Taraborelli commented about the 2018 goals. 42 1. Increase pedestrian circulation along Paoli Pike, especially in the form of a "Paoli 43 Pike Promenade" with sidewalks and crosswalks, as well as increasing pedestrian 44 circulation and safety along Greenways, with trails, walkways and crosswalks. 45 2. Develop the Paoli Pike Trail to create the linkage between West Chester and 46 Malvern, through East Goshen, from West Goshen to Willistown. Also the BOS
Annual Session 1-6-2018 draft 3
1 suggests the Commission consider the potential for feeder trails from the various 2 developments to the Paoli Pike Trail. 3 3. Complete the playground renovation. Opening is expected to be in March/ April. 4 4. Renovate the basketball court area 5 5. Improve the upper sports fields to include landscaping and increased driveway 6 6. Install security cameras in the park 7 Christine mentioned that they want to make the Veterans Pavilion more for seniors 8 with chessboards, etc. Also they want to improve the pathway from the Pavilion to 9 the Pickle Ball Court. Also, a picnic area will be installed to support the playground 10 and the baseball fields. 11 Marty acknowledged all that Jason does especially the Bicentennial. He spoke about 12 the park and its importance in the township. He thanked Mark Miller and Public 13 Works for all the work they do on a daily basis. 14 15 Planning Commission 16 Brad Giresi acknowledged the other members of the Commission and thanked Mark 17 Gordon for all of the support he gives them. He gave the following update on the 18 progress of the Commission's 2017 goals: 19 1. Assist in the Paoli Pike Master Corridor Plan. 20 a. The Commission met with the Paoli Pike Corridor Master Plan Committee 21 on June 7th and provided feedback to the committee on the planning done to date. 22 b. Staff has kept us informed of the current planning on the Corridor Plan 23 throughout the process and has sought our feedback for inclusion into the plan. 24 c. Two members of the Commission are members of the Corridor Plan 25 Committee and update us monthly while seeking input from the Commission. 26 d. The PC is already discussing how to move forward with a "Town Center" 27 overlay district in anticipation of a supporting recommendation in the Paoli Pike 28 Corridor Master Plan. 29 2. Review the Zoning Ordinance as it relates to new technologies. 30 a. The Township amended the Zoning Ordinance in 2016 to include 31 Distributive Antenna Systems (DAS) into the body of existing wireless 32 communications regulations. Since then, Crown Castle applied for conditional use 33 approval to install 6 new DAS node locations. The PC worked with Crown Castle to 34 site the location of those nodes during the application process. DAS nodes are 35 helping to provide more reliable coverage in highly populated and intense use areas. 36 The PC will continue to stay informed on new wireless communication technologies. 37 b. Drone technologies are quickly evolving and so are their commercial 3 8 applications. The PC has asked staff to bring them up to speed on the latest FAA 39 regulations in order to determine if amendments to our existing ordinance are 40 warranted. 41 Items they will be looking at in 2018 are: 42 a. Review the PPMCP and look at the overlay district to determine what 43 needs to be amended in the Zoning Ordinance. 44 b. Look at single family development for the remaining parcels in the 45 township.
Annual Session 1-6-2018 draft 4
1 Marty thanked Mark Gordon and the Planning Commission for all the research and 2 recommendations they make to the BOS. 3 4 RECAP & CLOSING REMARKS 5 Marty thanked Rick for coordinating with Sunoco on the pipeline. He thanked Jon 6 Altshul for the work he did on the pipeline resolution for the township. He spoke 7 about the decision the BOS made to breach the 2 dams in the township and the 8 committees that were organized for the residents to participate in. Applications for 9 grants for these two projects were submitted. 10 The bond issue was very successful. East Goshen has a AAA bond rating along with 11 Chester County and the West Chester Area School District. 12 13 Janet, as Chairman of the Paoli Pike Trial Committee and the Corridor Taskforce, 14 appreciates all the input from the residents. She acknowledged all ABCs and what 15 they do. She feels East Goshen has the best AB Cs and hardest working residents. 16 17 Mike has a background in municipal government. He is so impressed with the 18 expertise and knowledge of the volunteers and the interfacing of the AB Cs and the 19 township staff. This helps the BOS made good decisions. 20 21 David commented that he has no experience with an ABC. The pipeline was his 22 incentive to become involved. He is looking forward to attending the ABC meetings 23 and getting to know the volunteers. 24 25 Rick thanked all of his staff (office and public works) for all that they do all year. 26 27 Marty led the Pledge of Allegiance and adjourned the meeting at 10:15 am. 28 29 Respectfully Submitted 30 31 32 33 Ruth Kiefer, Recording Secretary 34 35 F:\Data\Shared Data\Minutes\Board ofSupervisors\2018\Annual Session 1-6-2018.docx
Annual Session 1-6-2018 draft 5
1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, JANUARY 9, 2018 5 DRAFT MINUTES 6 7 8 Present: Chairman Marty Shane; Vice Chairman Carmen Battavio; Supervisors 9 David Shuey, Janet Emanuel and Mike Lynch; Township Manager Rick Smith; and 10 Conservancy Board Chairman Erich Meyer. 11 12 Call to Order & Pledge of Allegiance 13 Marty called the meeting to order at 7:00 p.m. and lead the pledge of allegiance. 14 15 Moment of Silence 16 Carmen called for a moment of silence to honor our EMS personnel and troops. 17 18 Recording 19 None. 20 21 Chairman's Report 22 Marty announced that the Board met prior to this meeting in Executive Session 23 prior to discuss a legal and police personnel matter and that it will continue the 24 Executive Session after this meeting. 25 26 New Business 27 Marty announced the sole purpose of the meeting was to consider a request from 28 Sunoco to continue the court hearing for the noise citations issued by the Township. 29 However, the Judge has already granted Sunoco's request to continue the hearing 30 and the new date has not yet been determined. 31 32 Public Comment 33 None. 34 35 Adjournment 36 There being no further business, Janet motioned to adjourn the meeting at 7:02 pm. 37 David seconded the motion. The motion passed 5-0. 38 39 Respectfully submitted, 40 41 Louis F. Smith, fr. 42 Township Manager
1/9/18 January 9, 2018 1
January 11, 2018
TREASURER'S REPORT
2017 & 2018 RECEIPTS AND BILLS
| GENERAL FUND | |||
|---|---|---|---|
| Real Estate Tax (2017) | $4,187.59 | Accounts Payable | $800,670.17 |
| Real Estate Tax (2018) | $10.00 | Electronic Pmts: | |
| Earned Income Tax (2018) | $69,652.17 | Credit Card | $0.00 |
| Local Service Tax (2018) | $2,784.22 | Postage | $1,000.00 |
| Transfer Tax | $0.00 | Debt Service | $9,460.82 |
| General Fund Interest Earned (2017) | $3,677.30 | Payroll | $126,470.39 |
| Total Other Revenue (2017) | $123,314.57 | Total Expenditures: | $937,601.38 |
| Total Other Revenue (2018) | $2,975.11 | ||
| Total General Fund Receipts: | $206,600.96 | ||
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | ||
| Interest Earned (2017) | $361.41 | ||
| Total State Liqud Fuels: | $361.41 | Expenditures: | $0.00 |
| SINKING FUND | |||
| Receipts | $0.00 | Accounts Payable | $51,775.58 |
| Interest Earned (2017) | $7,043.85 | Credit Card | $0.00 |
| Total Sinking Fund: | $7,043.85 | Total Expenditures: | $51,775.58 |
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | ||
| Interest Earned (2017) | $437.25 | ||
| Total Sinking Fund: | $437.25 | Expenditures: | $0.00 |
| SEWER OPERATING FUND | |||
| Receipts (2017) | $10,006.56 | Accounts Payable (2017) | $70,000.00 |
| Interest Earned (2017) | $150.55 | Accounts Payable (2018) | $55,572.36 |
| Receipts (2018) | $7,228.43 | Debt Service | $28,240.59 |
| Total Sewer: | $17,385.54 | Total Expenditures: | $153,812.95 |
| REFUSE FUND | |||
| Receipts (2017) | $3,790.81 | ||
| Interest Earned (2017) | $25.08 | ||
| Receipts (2018) | $2,957.09 | ||
| Total Refuse: | $6,772.98 | Expenditures: | $10,364.50 |
| BOND FUND | |||
| Receipts | $0.00 | ||
| Interest Earned (2017) | $7,110.73 | ||
| Total Bond: | $7,110.73 | Expenditures: | $45,174.15 |
| SEWER SINKING FUND | |||
| Receipts | $0.00 | ||
| Interest Earned (2017) | $558.29 | ||
| Total Sewer Sinking Fund: | $558.29 | Expenditures: | $0.00 |
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | ||
| Interest Earned (2017) | $483.20 | ||
| Total Operating Reserve Fund: | $483.20 | Expenditures: | $0.00 |
EAST GOSHEN TOWNSHIP
MEMORANDUM
TO: BOARD OF SUPERVISORS
FROM: BRIAN MCCOOL
SUBJECT: PROPOSED PAYMENTS OF BILLS
DATE: 01-11-2018
Please accept the attached Treasurer's Report and Expenditure Register Report for consideration by the Board of Supervisors. I recommend the Treasurer's Report and each register item be approved for payment.
General Fund expenses include $512,391 for the January contribution to WEGO, $75,922 for property and liability insurance, $50,485 for health insurance, $35,450 for road salt, and $22,171 for public official liability insurance.
General Fund revenue (2017) includes the 4th quarter reimbursements from the Sewer Fund (96,309) and the Refuse Fund ($16,069).
Sinking Fund expenses include $40,803 for the new playground.
Sewer Fund expenses (2018) include $31,011 for property and liability insurance, Please advise if the Board decides to make any changes or if the reports are acceptable as drafted. Sewer Fund expenses (2017) reflect a transfer to the Municipal Authority for $70,000, which was not reported on the last treasurer's report.
Bond Fund expenses include $45,174 for engineering costs for Segment C of the trail.
EAST GOSHEN TOWNSHIP
MONTHLY DEBT PAYMENT BREAKDOWN
January 31, 2018
GENERAL FUND:
Interest Principal Year of Loan Original Remaining Retirement
payment payment Issuance Description loan amount Principal Date
$7,589.19 $0 2003 Multi purpose $5,500,000 $2,113,000 2023
9 projects
$1,563.10 $0 1999 Applebrook $3,000,000 $462,000 2019
Park
$308.53 $0 2000 Spray $287,000 $89,000 2021
Irrigation
SEWER FUND:
Interest Principal Loan Original Remaining Retirement
payment payment Description loan amount Principal Date
$22,859.10 $0 2008 RCSTP $9,500,000 $6,927,000 2032
Expansion
$5,381.49 $0 2013 Diversion $2,500,000 $2,118,000 2033
Projects
U:\bmccool\2018\Journal Entries\Debt Service\2018 - Debt Service Report for Treasurers Report.xlsx
~ast Goshen Township Fund Accounting
~eport Date 01/02/18
WlP05 run by BARBARA 10 59 AM
Expenditures Register
GL-1801-61354
BATCH 1OF5
PAGE
Tender Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
3613 DELAWARE VALLEY HEALTH TRUST 53622 1 01486 1560 HEALTH,ACCID. & LIFE 14010 01/02/18 01/02/18 49,140.36 JANUARY 2018 PREMIUM - MED.& RX 53622 2 01213 1000 DENTAL INSURANCE W/H 14010 01/02/18 01/02/18 1,345.00 JANUARY 2018 PREMIUM - MED.& RX
50,485.36
1970 GANNETT FLEMING COMPANIES 53623 1 01413 3130 ENGINEERING SERVICES 050532.A8*46079 01/02/18 01/02/18 2, 725.00 2018 GEOPLAN ANNUAL LICENSE FEE
2;725.00
1636 ICC - MEMBERSHIPS 53624 1 01413 3000 GENERAL EXPENSE 3180593 01/02/18 01/02/18 135.00 GOVERNMNTL MEMBERSHIP 2018 -5140121
135.00
3827 JLC 53625 1 01414 3000 CODE BOOKS/OTHER 1110485455-18 01/02/18 01/02/18 49.95 JRNL OF LIGHT CONSTRUCTION 2018
49.95
904 MRM PROPERTY & LIABILITY TRUST 53626 1 01486 3500 INSURANCE COVERAGE -PREM. 379919 01/02/18 01/02/18 75,922.43 MRM PROP.& LIABILITY 1/1/18-1/1/19
75,922.43
1008 PA RECREATION & PARKS SOCIETY 53628 1 01452 3000 GENERAL EXPENSE 4664 01/02/18 01/02/18 20.00 2018 PRPS MEMBERSHIP - M.MILLER 53629 1 01452 3000 GENERAL EXPENSE 3784 01/02/18 01/02/18 120.00 2018 PRPS PROF.MEMBERSHIP - J.LANG
140.00
2016 PACO 53627 1 01413 3000 GENERAL EXPENSE 010118 01/02/18 01/02/18 60.00 2018 MEMBERSHIP- G.ALTHOUSE 5256876 53630 1 01413 3000 GENERAL EXPENSE 010118-D 01/02/18 01/02/18 60.00 2018 MEMBERSHIP-V.DIMARTINI 5313306 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
120.00
1
:ast Goshen Township Fund Accounting
leport Date 01/02/18
m.RP05 run by BARBARA 10 : 59 AM
Expenditures Register
GL-1801-61354
BATCH 10F 5
PAGE
7endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
1049 PENNBOC 53631 1 01413 3000 GENERAL EXPENSE 121917 2018 MEMBERSHIP - G.ALTHOUSE CN#894
3373 SESAC LLC
3922
53632 1 01452 3210 FARMERS MARKET EXPENSE 2018 MUSIC LICENSE 53632 2 01452 5150 AMPHITHEATER CONCERTS 2018 MUSIC LICENSE
TD AMERITRADE FBO 913020442 53633 1 01410 5300 POLICE GEN.EXPENSE COMM.VEHICLE INSPECTION FINES FBO POLICE PENSION PER WESTTOWN AGREMNT
2055 UNIVEST CORP 53634 1 01486 3500 INSURANCE COVERAGE -PREM. 2018 PUBLIC OFFICIAL LIABILITY & POLICY FEE
2050 VILLAGE MEDICAL 53635 1 01487 1550 DRUG & ALCOHOL TESTING 2018 RANDOM POOL SELECTION AGREEMNT
10133034
10133034
122917
4919
010118
01/02/18 01/02/18 85.00
85.00
01/02/18 01/02/18 208.50
01/02/18 01/02/18 208.50
417.00
01/02/18 01/02/18 2,337.50
2,337.50
01/02/18 01/02/18 22,171.00
22 ,171. 00
01/02/18 01/02/18 135.00
135.00
2
~ast Goshen Township Fund Accounting
Report Date 01/02/18
)!ARP05 run by BARBARA 10 59 AM
Expenditures Register
GL-1801-61354
BATCH 10F 5
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERATING
904 MRM PROPERTY & LIABILITY TRUST 53626 2 05429 3500 ADMIN.- INSURANCE 379919
MRM PROP.& LIABILITY 1/1/18-1/1/19
FUND SUMMARY
Fund Bank Account Amount Description
01 01 05 05 154,723.24 GENERAL FUND 31,010.57 SEWER OPERATING
185,733.81
PERIOD SUMMARY
Period Amount
1801 185,733.81
185,733.81
01/02/18 01/02/18 31,010.57
31,010.57
185,733.81 0 Printed, totaling 185,733.81
3
~ast Goshen Township Fund Accounting
~eport Date 01/02/18
1ARP05 run by BARBARA 11 46 AM
/endor Req # Budget# Sub# Description
01 GENERAL FUND
1471 WESTTOWN-EAST GOSHEN POLICE 53636 1 01410 5300 POLICE GEN.EXPENSE JANUARY 2018 CONTRIBUTION
FUND SUMMARY
Fund Bank Account Amount Description
01 01 512,391.21 GENERAL FUND
512,391.21
PERIOD SUMMARY
Period Amount
1801 512,391.21
512,391.21
Expenditures Register
GL-1801-61356
BATCH 2 OF5
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
010118 01/02/18 01/01/18 01/02/18 14660 p 512,391.21
1 Prepaids, totaling 0 Printed, totaling
512,391.21
512,391.21 512,391.21 0.00
1
:ast Goshen Township Fund Accounting
:eport Date 01/08/18
IARPOS run by BARBARA 12 03 PM
'ender Req # Budget# Sub# Description
01 GENERAL FUND
3923 DUVALL BUS COMPANY LLC 53642 1 01430 2330 VEHICLE MAINT AND REPAIR MIKE ZALVIDAR - COL TESTING
FUND SUMMARY
Fund Bank Account Amount Description
01 01 400.00 GENERAL FUND
400.00
PERIOD SUMMARY
Period Amount
1801 400.00
400.00
BATCH 3 OF 5
Expenditures Register
GL-1801-61418
PAGE
Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount
010818 01/08/18 01/08/18 01/08/18 14670
1 Printed, totaling
400.00
400.00
400.00 400.00
1
ast Goshen Township Fund Accounting
eport Date ·01/10/18
ARP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
PAGE
endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ----- --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
2226 21ST CENT.MEDIA NEWS #884433 53643 1 01401 3400 ADVERTISING - PRINTING 1478693
68
1657
82
102
NOTICE GIVEN - BOS MTG. 12/19/17 53644 1 01401 3400 ADVERTISING - PRINTING 1485024 NOTICE - BIDS 1/8/18
AMS APPLIED MICRO SYSTEMS LTD. 53645 1 01401 3120 CONSULTING SERVICES 64103 DECEMBER 2017 53645 2 01414 5001 ZONING IT CONSULTING 64103 DECEMBER 2017 - GEO PLAN
AQUA PA 53648 1 01409 3600 TNP. BLDG. - FUEL, LIGHT, WATER 122117 TB 000309828 0309828 11/20-12/19/17 TB 53649 1 01409 3600 TNP. BLDG. - FUEL, LIGHT, WATER 122117 FR 000309820 0309820 11/20-12/19/17 FR 53650 1 01409 3600 TNP. BLDG. - FUEL, LIGHT, WATER 122917 BS 000309801 0309801 11/27-12/27/17 BS 53651 1 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 122117 PW 000496917 0309798 11/20-12/19/17 PW
ASSOCIATED TRUCK PARTS 53657 1 01432 2500 SNOW - MAINTENANCE & REPAIRS SPREADER LITS
B&D COMPUTER SOLUTIONS 53658 1 01401 3120 CONSULTING SERVICES DECEMBER 2017 53658 2 01407 2130 COMPUTER EXPENSE RTK EMAIL LOOKUP & XFER FOR RICK
200909
00003141
00003141
119 BEE.NET INTERNET SERVICES 53659 1 01401 3210 COMMUNICATION EXPENSE JANUARY 2018 BEE MAIL ACCTS
201801008
01/09/18 01/09/18 361.16
01/09/18 01/09/18 407.78
768.94
01/09/18 01/09/18 1,097.00
01/09/18 01/09/18 28.00
1,125.00
01/09/18 01/09/18 148.40
01/09/18 01/09/18 206.80
01/09/18 01/09/18 21.40
01/09/18 01/09/18 168.90
545.50
01/09/18 01/09/18 253.60
253.60
01/09/18 01/09/18 2,000.00
01/09/18 01/09/18 300.00
2,300.00
01/09/18 01/09/18 315.00
315.00
1
ast Goshen Township Fund Accounting
eport'Date 01/10/18
11RP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 40F 5
PAGE
'endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
3924 BIRSCH, JAN 53660 1 01367 3711 PILATES REFUND RE: CLASSES MISSED DURING FAMILY EMERGENCY
145 BISEL CO INC, GEORGE T.
122717
53661 1 01414 3000 CODE BOOKS/OTHER 9171 2018 SUPPLEMENT -RYAN PA ZONING LAW
1198 BRANDYWINE VALLEY SPCA
2675
3488
53663 1 01410 5400 S.P.C.A. CONTRACT CHESCO FULL ANNUAL FEE 2018
CANDLESTICK COMMUNICATIONS 53664 1 01401 3210 COMMUNICATION EXPENSE REPLACE HEADSET CORD -CONFERENCE RM
CINTAS CORPORATION #287 53668 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS WEEK END 12/20/17 CLEAN MATS 53668 2 01487 1910 UNIFORMS WEEK END 12/20/17 CLEAN UNIFORMS 53668 3 01487 1910 UNIFORMS CRED. APPLIED FROM PREVIOUS INVOICE
293 COLONIAL ELECTRIC SUPPLY
296
53669 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS KSTN KT-LED LIGHTS
COMCAST 8499-10-109-0028306 53671 1 01401 3210 COMMUNICATION EXPENSE 0028306 JANUARY 2018
1148
TI712211600
287847959
287847959
287847959
11815885
122217
01/09/18 01/09/18 31.50
31.50
01/09/18 01/09/18 190.24
190.24
01/09/18 01/09/18 1,591.35
1,591.35
01/09/18 01/09/18 180.00
180.00
01/09/18 01/09/18 78.49
01/09/18 01/09/18 422.76
01/09/18 01/09/18 -27.62
473.63
01/10/18 01/10/18 193.00
193.00
01/10/18 01/10/18 114. 40
114 '40
2
ast Goshen Township Fund Accounting
eport·Date 01/10/18
ARP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE
endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
3250 COMCAST 8499-10-109-0107704 53670 1 01401 3210 COMMUNICATION EXPENSE 121517 0107704 12/23/17-1/22/18 P&BOOT LED
317 CONTRACTOR'S CHOICE 53672 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS CALCIUM PELLETS 53672 2 01409 3745 PW BUILDING - MAINT REPAIRS CALCIUM PELLETS
1990 CRYSTAL SPRINGS
00218965
00218965
01/10/18
01/10/18
01/10/18
53673 1 01401 2100 MATERIALS & SUPPLIES COFFEE, SUGAR & CREAMER
3154612 122217 01/10/18
1790
3752
DCED 53674 1 01413 3720 UNIFORM CONSTRUCTION CODE FEES UCC FEES - OCTOBER 2017 53675 1 01413 3720 UNIFORM CONSTRUCTION CODE FEES UCC FEES - NOVEMBER & DECEMBER 2017
EASTERN SALT COMPANY INC. 53677 1 01432 2460 SNOW - MATERIALS & SUPPLIES 321.99 TONS ROCK SALT
3407 ETS EQUIPMENT TRADE SERVICE CO. INC.
010318-1
010318
INV069910
53676 1 01432 2500 SNOW - MAINTENANCE & REPAIRS 110472 DEUCE WASH & WAX VEHICLE WASH AND . INDUSTRIAL DETERGENT
473 FASTSIGNS 53678 1 01401 2100 MATERIALS & SUPPLIES 368-51107-2 BALANCE DUE - DAVID SHUEY NAMEPLATE
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18 105.75
105.75
01/10/18 349.92
01/10/18 349.92
699.84
01/10/18 158.62
158.62
01/10/18 228.00
01/10/18 391.50
619.50
01/10/18 19,528.71
19,528.71
01/10/18 103.22
103.22
01/10/18 7.60
7.60
3
ast Goshen Township Fund Accounting
epor't Date 'Ol/10/18
!'IRP05 run by BARBARA 12 : 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE
ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
3595 FETTERS INC. ,R.W.
525
53679 l 01438 3845 EQUIP. RENTAL -RESURFAC. TRI-AXLE BLACKTOP HAULING
GARDEN STATE HWY. PRODUCT 53681 l 01433 2500 MAINT. REPAIRS.TRAFF.SIG. HIP RIGHT & LEFT SIDE ROAD SIGNS
3000 GARNET FORD 53680 l 01430 2330 VEHICLE MAINT AND REPAIR REPLACE DEF HEATER ASSY & TRANS FILTER - 2011 FORD F-350
3131 GREAT AMERICA FINANCIAL SERVICES
121117
126966
C36083
53682 1 01401 3840 RENTAL OF EQUIP. -OFFICE 21867243 LANIER MP C5503 RENTAL - JAN.2018
594 HAMMOND & MCCLOSKEY INC. 53684 1 01409 3745 PW BUILDING - MAINT REPAIRS CONNECT GAS / ELECTRIC & VENT TO HEATING UNIT - PW LOADING DOCK 53685 1 01454 3740 EQUIPMENT MAINT. & REPAIR WINTERIZE OUTSIDE HOSE FAUCETS AT
PARK
2717 HIGGINS & SONS INC., CHARLES A. 53686 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT MAINT.- PAOLI PK. & BOOT 53687 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT MAINT.- PAOLI PK. & BOOT
2680 HOTSY EQUIPMENT COMPANY 53688 l 01437 2460 GENERAL EXPENSE - SHOP NOZZLES
8490
8489
45940
45942
50-48953
Ol/10/18 Ol/10/18 617.50
617.50
01/10/18 Ol/10/18 89.00
89.00
01/10/18 01/10/18 l,364.57
l,364.57
01/10/18 01/10/18 335.50
335.50
01/10/18 01/10/18 503.67
01/10/18 Ol/10/18 205.50
709.17
01/10/18 01/10/18 105.00
01/10/18 01/10/18 105.00
210.00
Ol/10/18 Ol/10/18 59.88
59.88
4
ast Goshen Township Fund Accounting
.eport Date '01/10/18
ARP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
PAGE
ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
679 INTERCON TRUCK EQUIPMENT 53689 1 01432 2500 SNOW - MAINTENANCE & REPAIRS 1059600-IN MONROE - SKID SHOE ASSEMBLIES 53690 1 01432 2500 SNOW - MAINTENANCE & REPAIRS 1059831-IN VARITECH WHEELS, BOLTS, WASHERS & LOCKNUTS
2442 KENT AUTOMOTIVE 53692 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. 9305444282 CARRIAGE BOLTS 53693 1 01430 2330 VEHICLE MAINT AND REPAIR 9305441575 1/4" TUBE - MALE CONNECTOR 53694 1 01432 2500 SNOW - MAINTENANCE & REPAIRS 9305445380 HEX CAP SCREWS & LOCK NUTS 53695 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. 9305448604 CARRIAGE BOLTS 53696 1 01430 2330 VEHICLE MAINT AND REPAIR 9305452172 KOOL KUT LUBE, COUPLERS & TIPS
3838 KNIGHT BROS. INC. 53697 1 01438 2460 TREE REMOVAL 12299 TREE REMOVAL - MILLRACE 10/27 53698 1 01438 2460 TREE REMOVAL 12300 TREE REMOVAL - BEAUMONT 12/11/17
765 LENNI ELECTRIC CORPORATION 53699 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 171164 REPAIR LIGHT -OUTSIDE RICK'S OFFICE 53703 1 01409 3840 DISTRICT COURT EXPENSES 171159 INSTALL 4 LED LIGHTS - DIST.CT. LOT
2861 LITTLE INC., ROBERT E. 53704 1 01430 2330 VEHICLE MAINT AND REPAIR JDC KNIFE
3-517529
01/10/18 01/10/18 3,506.76
01/10/18 01/10/18 76.92
3,583.68
01/10/18 01/10/18 104.43
01/10/18 01/10/18 136.55
01/10/18 01/10/18 417.67
01/10/18 01/10/18 250.57
01/10/18 01/10/18 714.25
1,623.47
01/10/18 01/10/18 1,760.00
01/10/18 01/10/18 2,480.00
4,240.00
01/10/18 01/10/18 414.66
01/10/18 01/10/18 885.00
1,299.66
01/10/18 01/10/18 189.52
189.52
5
ast Goshen Township Fund Accounting
eport· Date 01/10/18
ARP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE
ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
1817 LOWES BUSINESS ACCOUNT/GECF 53705 l 01433 2450 MATERIALS & SUPPLIES - SIGNS 42 80LB BAGS CONCRETE MIX FOR SIGNS
864 METROPOLITAN COMMUNICATIO 53708 l 01430 2330 VEHICLE MAINT AND REPAIR INSTALL SIREN & PRIORITY GREEN STROBE
2750 MRM WORKER'S COMP. FUND 53709 l 01486 3500 INSURANCE COVERAGE -PREM. AUDIT PREMIUM 10/l/16 - 9/30/17
1641 NAPA AUTO PARTS 53710 l 01430 2330 VEHICLE MAINT AND REPAIR OIL, AIR & FUEL FILTERS 53711 l 01430 2330 VEHICLE MAINT AND REPAIR OIL, AIR & FUEL FILTERS 53712 l 01430 2330 VEHICLE MAINT AND REPAIR OXY/SENS 53713 l 01430 2330 VEHICLE MAINT AND REPAIR ANTIFREEZE 53714 l 01430 2330 VEHICLE MAINT AND REPAIR l5W40 OIL - 12 QTS. 53715 l 01430 2330 VEHICLE MAINT AND REPAIR PROTECTANT WIPES & CLEANERS
121717
IN000106453
l6i7AUD9244
2-724832
2-724831
2-725620
2-724596
2-724598
2-721378
2371 NATIONAL TRUST FOR HISTORIC PRESERVATION 53717 l 01462 3000 MEMBERSHIPS/SUBS 120117 2018 MEMBERSHIP DUES
01/10/18 01/10/18 191.36
191.36
01/10/18 01/10/18 2,025.00
2,025.00
01/10/18 01/10/18 979.00
979.00
01/10/18 01/10/18 242.24
Ol/10/18 01/10/18 242.24
01/10/18 01/10/18 79.99
01/10/18 01/10/18 55.74
01/10/18 01/10/18 38.40
01/10/18 01/10/18 38.78
697.39
01/10/18 01/10/18 60.00
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
969 O'ROURKE & SONS INC. 53721 l 01432 2500 SNOW - MAINTENANCE & REPAIRS 5" CHANNEL R38750
60.00
01/10/18 01/10/18 50.00
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
50.00
6
ast Goshen Township Fund Accounting
eport Date ·01/10/18
ARP05 run by BARBARA 12 : 37 PM
Expenditures Register
GL-1801-61449
PAGE
ender Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount
3548 OFFICE BASICS 53718 1 01401 2100 MATERIALS & SUPPLIES STAMP- DATER
1554 OFFICE DEPOT
I-803179 01/10/18
53719 1 01401 2100 MATERIALS & SUPPLIES MANILLA FOLDERS & DESKPAD 53720 1 01401 2100 MATERIALS & SUPPLIES HIGHLIGHTERS & BINDERS
989376688001 01/10/18
2876
3699
2352
1555
991536323001 01/10/18
P T EQUIPMENT LLC. 53746 4 01409 3740 TWP. BLDG. - MAINT & REPAIRS 122217 2018 SERVICE PROGRAM 53746 5 01409 3745 PW BUILDING - MAINT REPAIRS 122217 2018 SERVICE PROGRAM
PAULB LLC-LITITZ 53722 1 01437 2460 GENERAL EXPENSE - SHOP 432816/1 TRASH CAN, TOOL BX LEVEL, UTILITY KNIVES I BUNGEE CORD I WASH BRUSHES I POST HOLE DIGGERS 53723 1 01430 2330 VEHICLE MAINT AND REPAIR 432827/1 CARGO BAR TWIST N LOCK
PECO - 99193-01400 53726 1 01434 3610 STREET LIGHTING 010218 99193-1400 11/21-12/22/17 53726 2 01433 2470 UTILITIES - TRAFFIC LIGHTS 010218 99193-1400 11/21-12/22/17
PECO - 45168-01609 53727 1 01409 3840 DISTRICT COURT EXPENSES 122217 45168-01609 11/18-12/21/17 GAS 53727 2 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 122217 45168-01609 11/18-12/21/17 ELECTRIC
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18
01/10/18 29.44
29.44
01/10/18 28.82
01/10/18 85. 71
114 .53
01/10/18 936.00
01/10/18 936.00
1,872.00
01/10/18 546.84
01/10/18 25.99
572.83
01/10/18 778.53
01/10/18 675.44
1,453.97
01/10/18 1,615.25
01/10/18 880.27
2,495.52
7
ast Goshen Township Fund Accounting
eport Date ' 01/10/18
!IRP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE
ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
2592 PECO - 45951-30004 53725 1 01454 3600 UTILITIES 121917 45951-30004 11/15-12/18/17 RESTROMS
2591 PECO - 59500-35010 53724 1 01454 3600 UTILITIES 122217 59500-35010 11/20-12/21/17 POND PMP ·
1052 PENNON! ASSOCIATES INC. 53731 1 01413 3130 ENGINEERING SERVICES 781446 SERV. THRU 11/26/17 SUNOCO NOISE & VIBRATION 53732 1 01408 3130 ENGINEERING SERVICES 781455 SERV. THRU 11/26/17 MALVERN INST. 53733 1 01408 3131 ENGINEER.& MISC.RECHARGES 781452 SERV. THRU 11/26/17 SUNOCO PIPLN E&S 53734 1 01408 3131 ENGINEER.& MISC.RECHARGES 781447 SERV. THRU 11/26/17 GOSHEN MEADOWS 53735 1 01408 3131 ENGINEER.& MISC.RECHARGES 781449 SERV. THRU 11/26/17 GIONFRIDDO 942 CORNWALLIS 53736 1 01408 3131 ENGINEER.& MISC.RECHARGES 78140 SERV. THRU 11/26/17 APPLBRK-TEACHNG 53737 1 01408 3131 ENGINEER.& MISC.RECHARGES 781453 SERV. THRU 11/26/17 KNAUER 53738 1 01408 3131 ENGINEER.& MISC.RECHARGES 781454 SERV. THRU 11/26/17 1003 & 7 TAYLOR 53739 1 01408 3131 ENGINEER.& MISC.RECHARGES 781456 SERV. THRU 11/26/17 DELANEY
2417 PPC LUBRICANTS EAST 53741 1 01430 2330 VEHICLE MAINT AND REPAIR 55 GAL BLUE DEF
2539 PRECISION MECHANICAL SERVICES 53742 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS SERVICE CALL RE: COLD ALARM ISSUES
1479032
SC-16064
01/10/18 01/10/18 483.80
483.80
01/10/18 01/10/18 36.46
36.46
01/10/18 01/10/18 6,244.49
01/10/18 01/10/18 119. 00
01/10/18 01/10/18 73.25
01/10/18 01/10/18 207.00
01/10/18 01/10/18 300.00
01/10/18 01/10/18 1,839.00
01/10/18 01/10/18 1,176.50
01/10/18 01/10/18 162.50
01/10/18 01/10/18 20.00
10,141. 74
01/10/18 01/10/18 165.85
165.85
01/10/18 01/10/18 418.20
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
418.20
8
!St Goshen Township Fund Accounting
eport Date · 01/10/18
ri.RP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE
ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
991 PSATS 53743 1 01401 3070 PSATS EXPENSE PAAZO MEMBERSHIP 2018 M.GORDON
1876 RANSOME RENTAL COMPANY LP 53747 1 01432 3840 SNOW - EQUIPMENT RENTAL WHEEL LOADER & FUSION BUCKET RENTAL
11/22/17 - 12/20/17 53748 1 01438 3840 EQUIPMENT RENTAL CREDIT FOR INVOICE DATED 4/2016 53748 2 01430 2330 VEHICLE MAINT AND REPAIR CREDIT FOR INVOICE DATED 8/2017 53748 3 01436 3840 STORMWATER EQUIPMENT RENTAL CREDIT FOR INVOICE DATED 9/2017
3389 RED KNIGHT PRINT 53750 1 01401 2100 MATERIALS & SUPPLIES COPY PAPER FOR CANNON IMAGE COPIER
3292 REGER RIZZO DARNALL LLP
1161
53751 1 01404 3140 LEGAL - ADMIN
53752 1
53753 1
53754 1
LEGAL SERVICE - NOV. 2017 SUNOCO PIPELINE
REILLY & SONS INC 01430 2320 VEHICLE OPERATION - FUEL 617.8 GALLONS DIESEL 01430 2320 VEHICLE OPERATION - FUEL 686.1 GALLONS DIESEL 01430 2320 VEHICLE OPERATION - FUEL 47.8 GALLONS GASOLINE
1212 SAYRE INC., G.L. 53755 1 01430 2330 VEHICLE MAINT AND REPAIR FUEL FILTERS & CAPS
INV-28908-D5TO 01/10/18 01/10/18 125.00
125.00
K237l701 01/10/18 01/10/18 4,411.00
123117 01/10/18 01/10/18 -91.09
123117 01/10/18 01/10/18 -104.47
123117 01/10/18 01/10/18 -338.70
3,876.74
173267 01/10/18 01/10/18 63.21
63.21
115312 01/10/18 01/10/18 400.00
400.00
134050 01/10/18 01/10/18 1,310.97
133479 01/10/18 01/10/18 1,431.20
133672 01/10/18 01/10/18 86.47
2,828.64
1-273520058 01/10/18 01/10/18 225.48
225.48
9
ast Goshen Township Fund Accounting
eport·Date 01/10/18
11RP05 run by BARB11RA 12 37 PM
Expenditures Register
GL-1801-61449
PAGE 10
endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
2121 SHERWIN-WILLIAMS CO. 53756 1 01409 3745 PW BUILDING - MAINT REPAIRS 1231-2 01/10/18 22 CONTAINERS HIGHWAY WHITE PAINT
3918 SHUEY, DAVID 53757 1 01401 3070 PSATS EXPENSE INV-28189-Q1Z8 01/10/18 REIMBURSEMENT - 2018 BOOTCAMP CLASS
2108 SIDELINES SPORTSWE11R & PROMOTIONS 53758 1 01487 1910 UNIFORMS 5889 HUNTER GREEN LONG SLEEVE SHIRTS
3120 STTC SERVICE TIRE TRUCK CTRS INC. 53760 1 01430 2330 VEHICLE MAINT AND REPAIR Y14016-17 ALL TERRAIN TIRES
2813 TELTHORSTER, RUBY
2273
2829
53761 1 01452 3711 PILATE$ 122717 PILATE INSTRUCTION FALL SESSION 2
VERIZON - 0527 53765 1 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 121517-0527 DEC. 15, 2017 - JAN. 14, 2018
01/10/18
01/10/18
01/10/18
01/10/18
VERIZON - TWP.FIOS 0001-74 53762 1 01401 3210 COMMUNICATION EXPENSE 12/28/17 - 1/27/18 FIOS TWP 0001-74 122717 01/10/18
2942 VERIZON WIRELESS 16809-00001 53766 1 01401 3210 COMMUNICATION EXPENSE NOV. 21, 2017 - DEC. 20, 2017
9798414006 01/10/18
01/10/18 237.38
237.38
01/10/18 149.00
149.00
01/10/18 110. 90
110.90
01/10/18 1,158.68
1,158.68
01/10/18 430.53
430.53
01/10/18 205.60
205.60
01/10/18 89.99
89.99
01/10/18 931.32
931.32
ast Goshen Township Fund Accounting
eport Date ·01/10/18
ARP05 run by BARBARA 12 37 PM
ender Req # Budget# Sub# Description
3791 VERIZON WIRELESS 16809-00002 53768 1 01401 3210 COMMUNICATION EXPENSE NOV. 21 - DEC. 20, 2017
2868 VERIZON-1420
1983
53764 1 01409 3840 DISTRICT COURT EXPENSES DEC. 16, 2017 - JAN. 15, 2018
YALE ELECTRIC SUPPLY CO 53770 1 01409 3745 PW BUILDING - MAINT REPAIRS ALUM.JACKET COIL & DEEP BOX
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
9798414007 01/10/18 01/10/18 132.60
132.60
121617-1420 01/10/18 01/10/18 82.93
82.93
Sl09457462.001 01/10/18 01/10/18 152.82
152.82
11
ast Goshen Township Fund Accounting
eport Date · 01/10/18
ARPOS run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE 12
ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
03 SINKING FUND
765 LENNI ELECTRIC CORPORATION 53702 1 03454 7450 CAPITAL PURCHASE - PARK & REC PARK TOT LOT - CONDUIT FOR POST
171161
3470 NASK DOOR INC.
1052
1154
53716 1 03409 7450 CAPITAL PURCHASE - TWP BLDG REPLACE BAY DOOR 4
PENNON! ASSOCIATES INC.
4115
53728 1 03409 7450 CAPITAL PURCHASE - TWP BLDG 781442 SERVICES THRO 11/26/17 TWP.ROOF 53729 1 03454 7450 CAPITAL PURCHASE - PARK & REC 776343 SERV. THRU 10/22/17 TWP.PARK PLAY- GROUND 53730 1 03454 7450 CAPITAL PURCHASE - PARK & REC 781443 SERV. THRU 11/26/17 TWP.PARK PLAY- GROUND
RECREATION RESOURCE INC 53749 1 03454 7450 CAPITAL PURCHASE - PARK & REC 17-172-2 PROGRESS PYMNT #2 -EGT PARK PLYGRND
01/10/18 01/10/18 358.66
358.66
01/10/18 01/10/18 4,600.00
4,600.00
01/10/18 01/10/18 2,172.00
01/10/18 01/10/18 1,890.75
01/10/18 01/10/18 3,553.50
7,616.25
01/10/18 01/10/18 35,000.00
35,000.00
ast Goshen Township Fund Accounting
epol:t Date · 01/10/18
ARP05 run by BARBARA 12 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE 13
endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERATING
2918 ALS ENVIRONMENTAL 53646 1 05422 4500 R.C. STP-CONTRACTED SERV. 40-2220656 LAB TESTING - RCSTP 12/15-12/19/17 53647 1 05422 4500 R.C. STP-CONTRACTED SERV, 40-22118339 LAB TESTING - RCSTP 11/28-12/12/17
1658 AQUA PA 53652 1 05420 3602 C.C. COLLECTION -UTILITIES 000309826 0309826 11/27-12/27/17 TH 53653 1 05420 3602 C.C. COLLECTION -UTILITIES 000305003 0305003 11/28-12/28/17 WW 53654 1 05420 3602 C.C. COLLECTION -UTILITIES 000300141 0300141 11/20-12/19/17 GH 53655 1 05420 3602 C.C. COLLECTION -UTILITIES 000363541 0357724 11/20-12/19/17 BK 53656 1 05422 3601 R.C. COLLEC.-UTILITIES 01533998 1087842 11/27-12/27/17 TWN
151 BLOSENSKI DISPOSAL CO, CHARLES
241
569
53662 1 05422 4502 R.C. SLUDGE-LAND CHESTER SWITCH 20YDS WITH LINER 12/18
C.C. SOLID WASTE AUTHORITY 53665 2 05422 4502 R.C. SLUDGE-LAND CHESTER WEEK 12/18/17 - 12/22/17 53666 2 05422 4502 R.C. SLUDGE-LAND CHESTER WEEK 12/26/17 - 12/30/17
GREAT VALLEY LOCKSHOP 53683 1 05422 3700 R.C. STP-MAINT.& REPAIRS 6 BRASS KEYS COPIED
694 J&L BUILDING MATERIALS INC 53691 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. ROOFING SHINGLES, UNDERLAYMENT, NAILS & VENTILATION FAN
122917 TH
010218 WW
122117 GH
122117 BK
122917 TWN
16350
49337
49408
COlBOOOOOO
04033944
01/09/18 01/09/18 18.00
01/09/18 01/09/18 315.00
333.00
01/09/18 01/09/18 34.73
01/09/18 01/09/18 33.19
01/09/18 01/09/18 21.40
01/09/18 01/09/18 21.40
01/09/18 01/09/18 62.09
172. Bl
01/09/18 01/09/18 181. 00
181.00
01/09/18 01/09/18 570.84
01/09/18 01/09/18 724.27
1,295.11
01/10/18 01/10/18 10.50
10.50
01/10/18 01/10/18 674.66
674.66
ast Goshen Township Fund Accounting
eport. Date '01/10/18
ARP05 run by BARBARA 12 : 37 PM
Expenditures Register
GL-1801-61449
BATCH 4 OF 5
PAGE 14
endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERATING
765 LENNI ELECTRIC CORPORATION 53700 1 05422 3701 R.C. COLLEC.-MAINT.& REPR EMERGENCY HERSHEY MILL PS - REPLACE DISCONNECT
171163
53701 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 171162 CHANGE OUT #2 PUMP HERSHEY MILL PS
3926 LRM INC. 53706 1 05422 3700 R.C. STP-MAINT.& REPAIRS PROMINENT PUMP & CABLE - CAUSTIC SYSTEM
3043 MAIN POOL & CHEMICAL COMP. INC.
2876
53707 1 05422 2440 R.C. STP- CHEMICALS
53744 1
53745 1
53746 1
53746 2
53746 3
1850 GALLONS ALUM SULFATE SOLUTION & 196 50LB BAGS SODIUM CARBONATE LT
P T EQUIPMENT LLC. 05422 3701 R.C. COLLEC.-MAINT.& REPR REPLACE GENERATOR CONTROLLER 05422 3701 R.C. COLLEC.-MAINT.& REPR RENTAL GENERATOR - 1 WEEK 05420 3702 C.C. COLLEC.-MAINT.& REPR. 2018 SERVICE PROGRl\M 05422 3700 R.C. STP-MAINT.& REPAIRS 2018 SERVICE PROGRl\M 05422 3701 R.C. COLLEC.-MAINT.& REPR 2018 SERVICE PROGRl\M
l083 PIPE LINE PLASTICS INC. 53740 1 05422 3700 R.C. STP-MAINT.& REPAIRS COUPLINGS & CLAMPS
17-792
1765234
EA40-16-SI-01
EA40-17-SI-01
122217
122217
122217
303864
01/10/18 01/10/18 667.00
01/10/18 01/10/18 387.00
1,054.00
01/10/18 01/10/18 1,950.00
1,950.00
01/10/18 01/10/18 5,104.50
5,104.50
01/10/18 01/10/18 6,060.00
01/10/18 01/10/18 462.00
01/10/18 01/10/18 936.00
01/10/18 01/10/18 936.00
01/10/18 01/10/18 936.00
9,330.00
01/10/18 01/10/18 3.09
3.09
ast Goshen Township Fund Accounting
eport Date · 01/10/18
ARP05 run by BARBARA 12 37 PM
endor Req # Budget# Sub# Description
1896 SPRINGER BROTHERS INC 53759 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. BALANCE DUE ASHBRIDGE ROOF
3529 VERIZON - MODEMS 53767 1 05420 3601 C.C. INTERCEPTOR-UTILITIES NOV. 26 - DEC. 25, 2017 MODEMS
2773 VERIZON - PW FIOS 0001-15 53763 1 05422 3601 R.C. COLLEC.-UTILITIES 12/28/17 - 1/27/18 FIOS PW
1983 YALE ELECTRIC SUPPLY CO 53769 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. SUREWAY BATTERIES
Expenditures Register
GL-1801-61449
BATCH 40F 5
PAGE 15
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
16277-2 01/10/18 01/10/18 342.00
342.00
9798763321 01/10/18 01/10/18 106.07
106.07
0001-15 122717 01/10/18 01/10/18 89.99
89.99
S109494668.001 01/10/18 01/10/18 23.36
23.36
ast Goshen Township Fund Accounting
eport ·Date · 01/10/18
ARP05 run by BARBARA 12 37 PM
endor Req # Budget# Sub# Description
06 REFUSE
241 C.C. SOLID WASTE AUTHORITY 53665 1 06427 4502 LANDFILL FEES WEEK 12/18/17 - 12/22/17 53666 1 06427 4502 LANDFILL FEES WEEK 12/26/17 - 12/30/17 53667 1 06427 4502 LANDFILL FEES ADJMT. INV. 49265 - RE: MATERIALS
FUND SUMMARY
Fund Bank Account Amount Description
01 01 03 03 05 05 06 06
76,615.26 GENERAL FUND 47,574.91 SINKING FUND 20,670.09 SEWER OPERATING 9,600.20 REFUSE
154,460.46
PERIOD SUMMARY
Period Amount
1801 154,460.46
154,460.46
Expenditures Register
GL-1801-61449
BATCH 40F 5
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
49337 01/09/18
49408 01/09/18
49265-C 01/09/18
01/09/18 4,985.74
01/09/18 4,817.61
01/09/18 -203.15
9,600.20
154,460.46 0 Printed, totaling 154,460.46
16
:ast Goshen Township Fund Accounting
:eport Date , 01/11/18
!ARP05 run by BARBARA 3 : 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
'endor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
2226 21ST CENT.MEDIA NEWS #884433 53778 1 01401 3400 ADVERTISING - PRINTING NOTICE - REORGANIZATION MTG.
1494886 01/11/18 01/11/18 366.34
53778 2 01401 3400 ADVERTISING - PRINTING 1494904 01/11/18 01/11/18 71 .08 NOTICE - REORGANIZATION MTG. rr- ·----- --------- ------- ---- _______________ -:::t __ ~!.!1:.SJ..D~ - f.}1A'2J~..Q,l;_~c?_1Si\AL(..~~~l! --------- ------ ------------
437.42
6 ABC PAPER & CHEMICAL INC 53779 1 01409 3745 PW BUILDING - MAINT REPAIRS 087036A 01/11/18 01/11/18 268. 76 FLOOR FINISH (3) 53780 1 01409 3745 PW BUILDING - MAINT REPAIRS 087036 01/11/18 01/11/18 179.17 FLOOR FINISH (2) 53781 1 01409 3745 PW BUILDING - MAINT REPAIRS 081038 01/11/18 01/11/18 32.35 MOP HANDLES & HEADS
480 .28
7 ABEL BROTHERS TOWING & AUTO 53782 1 01430 2330 VEHICLE MAINT AND REPAIR 118467 01/11/18 01/11/18 312.50 TOW FREIGHTLINER #41 TO SENN'S TRKG
312.50
1657 AQUA PA 53783 1 01411 3630 HYDRANT & WATER SERVICE 010218 279 01/11/18 01/11/18 4,696.50 00310033 0310033 11/30-12/29/17 186 53783 2 01411 3631 HYDRANTS - RECHARGE EXPENSE 010218 279 01/11/18 01/11/18 2,348.25 00310033 0310033 11/30-12/29/17 93 53784 1 01411 3630 HYDRANT & WATER SERVICE 010218 HY6 01/11/18 01/11/18 137.52 00309987 0309987 11/30-12/29/17 HY6 53785 1 01411 3630 HYDRANT & WATER SERVICE 010218 HY13 01/11/18 01/11/18 858.00 00310033 0706109 9/29-12/29/17 HY13 53786 1 01411 3630 HYDRANT & WATER SERVICE 010218 HY34 01/11/18 01/11/18 2,575.50 00348603 0348603 9/29-12/29/17 HY34 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2973 BORTEK INDUSTRIES INC. 53790 1 01430 2330 VEHICLE MAINT AND REPAIR FILTER POLYESTER KIT
NY013396 01/11/18
10, 615. 77
01/11/18 102 .59
102 .59
1
ast Goshen Township Fund Accounting
.eport Date , 01/11/18
JARP05 run by BARBARA 3 : 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
'ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
1198 BRANDYWINE VALLEY SPCA
197
3927
497
53791 1 01410 5400 S.P.C.A. CONTRACT ACO ACTIVITY FEE
BUCKLEY BRION MCGUIRE & MORRIS 53792 1 01413 3140 LEGAL - TWP CODE LEGAL SERV.- AUGUST 2017 FEMA FLOOD 53793 1 01413 3140 LEGAL - TWP CODE LEGAL SERV.- OCTOBER 2017 FEMA FLD 53793 2 01413 3140 LEGAL - TWP CODE CREDIT FOR DUPLICATE PAYMENT 8/24 53793 3 01413 3140 LEGAL - TWP CODE REFUND CHECK REC'VD RE: CREDIT BAL.
CARGILL INC. 53794 1 01432 2460 SNOW - MATERIALS & SUPPLIES 49.05 TONS DEICER SALT 53795 1 01432 2460 SNOW - MATERIALS & SUPPLIES 221.16 TONS DEICER SALT
COLLIFLOWER INC. 53796 1 01432 2500 SNOW - MAINTENANCE & REPAIRS HOSE ASSEMBLY 53797 1 01432 2500 SNOW - MAINTENANCE & REPAIRS SUCTION RETURN, FAST-LOK, FCAM & CRIMP FEE 53798 1 01437 2460 GENERAL EXPENSE - SHOP HOSE, COUPLERS & NIPPS 53799 1 01432 2500 SNOW - MAINTENANCE & REPAIRS BRINE HOSE PARTS 53800 1 01432 2500 SNOW - MAINTENANCE & REPAIRS BRINE HOSE PARTS
317 CONTRACTOR'S CHOICE 53801 1 01430 2330 VEHICLE MAINT AND REPAIR FILTERS
1206
13787
14445
14445
14445
2903821754
2903808788
L04532-001
L03631-001
L06141-001
L05442-001
L06115-001
00219261
01/11/18 01/11/18 41.20
41.20
01/11/18 01/11/18 447.00
01/11/18 01/11/18 38.00
01/11/18 01/11/18 -498.40
01/11/18 01/11/18 51.40
38.00
01/11/18 01/11/18 2,890.02
01/11/18 01/11/18 13,030.74
15,920.76
01/11/18 01/11/18 175.00
01/11/18 01/11/18 99.83
01/11/18 01/11/18 88.36
01/11/18 01/11/18 369.85
01/11/18 01/11/18 633.40
1,366.44
01/11/18 01/11/18 30.04
30.04
2
ast Goshen Township Fund Accounting
eport Date . 01/11/18
IARP05 run by BARBARA 3 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF5
PAGE
'ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
3872 EAGLE TERMITE & PEST CONTROL 53802 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 191022 EXTERM. SERVICE DEC, 2017 - TWP 53804 1 01409 3745 PW BUILDING - MAINT REPAIRS 191024 EXTERM. SERVICE DEC. 2017 - PW 53805 1 01409 3840 DISTRICT COURT EXPENSES 191025 EXTERM. SERVICE DEC. 2017 - DIST.CT
3407 ETS EQUIPMENT TRADE SERVICE CO. INC. 53807 1 01430 2330 VEHICLE MAINT AND REPAIR 110537
3352
CONCENTRATED INDUSTRIAL DETERGENT
GAP POWER RENTALS PLUS LLC 53808 1 01430 2330 VEHICLE MAINT AND REPAIR REPLACE FUEL FILTER & NOZZLE
2631 GRAPHIC IMPRESSIONS OF AMERICA INC.
1364547
53809 1 01401 2110 STATIONERY 17-9157 BOS LETTERHEAD & ENVELOPES
2680 HOTSY EQUIPMENT COMPANY 53811 1 01437 2460 GENERAL EXPENSE - SHOP MAINTENANCE & OIL CHANGE - POWER WASHERS
719 KEEN COMPRESSED GAS COMPANY
2442
53812 1 01437 2460 GENERAL EXPENSE - SHOP VARIOUS GASES
KENT AUTOMOTIVE 53813 1 01432 2500 SNOW - MAINTENANCE & REPAIRS PIGTAIL ASSEMBLIES, CRIMPERS, DIAG. GRIP & CRIMP TOOL 53815 1 01432 2500 SNOW - MAINTENANCE & REPAIRS GRAB HOOKS, BRAIDED HOSE, BUTANE TORCH, HEATER HOSE & FITTINGS 53816 1 01430 2330 VEHICLE MAINT AND REPAIR LOCK NUTS, WASHERS & HEX CAP SCREWS
50-49001
83164719
9305483166
9305479850
9305469799
01/11/18 01/11/18 105.00
01/11/18 01/11/18 45.00
01/11/18 01/11/18 50.00
200.00
01/11/18 01/11/18 626.40
626.40
01/11/18 01/11/18 60.58
60.58
01/11/18 01/11/18 256.00
256. 00
01/11/18 01/11/18 233.38
233.38
01/11/18 01/11/18 68.93
68.93
01/11/18 01/11/18 1,149.85
01/11/18 01/11/18 1,451. 70
01/11/18 01/11/18 443.43
3
ast Goshen Township Fund Accounting
.eport Date , 01/11/18
IARP05 run by BARBARA 3 : 22 PM
Expenditures Register
GL-1801-61472
BATCH 50F 5
PAGE
'endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
3838 KNIGHT BROS. INC.
765
53817 1 01438 2460 TREE REMOVAL TREE REMOVAL BEAUMONT & BOW TREE
LENNI ELECTRIC CORPORATION 53818 1 01409 3745 PW BUILDING - MAINT REPAIRS CHANGE LIGHTS - MECHANICS SHOP 53819 1 01409 3745 PW BUILDING - MAINT REPAIRS WIRE FEED -PW CEILING RECEPTACLES
3551 MCMAHON ASSOCIATES INC.
12309
171247
171248
53820 1 01401 3120 CONSULTING SERVICES 156564
864 53823 1
53824 1
1554
PROF.SERVICE 10/28-12/1/17 PAOLI PK CORRIDOR MASTER PLAN
METROPOLITAN COMMUNICATIO 01432 2500 SNOW - MAINTENANCE & REPAIRS EM-MX 0108 - ANTENNA 01432 2500 SNOW - MAINTENANCE & REPAIRS 90W LED LIGHT
OFFICE DEPOT
IN000106623
IN000106600
01/11/18
01/11/18
01/11/18
01/11/18
01/11/18
01/11/18
53825 1 01401 2100 MATERIALS & SUPPLIES 992531117001 01/11/18 QUAD PAD 1 INDEX MAKERS & DIVIDERS
3153 PECO - 01360-05046 53826 1 01409 7505 BOOT & PAOLI LED SIGN 010318 01/11/18 01360-05046 11/27-12/28/17 BOOT LED
3,044.98
01/11/18 1,140.00
1,140.00
01/11/18 667.00
01/11/18 71.50
738.50
01/11/18 4,054.26
4,054.26
01/11/18 40.00
01/11/18 165.00
205.00
01/11/18 48.07
48.07
01/11/18 27.01
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
27.01
1005 PENNSYLVANIA ONE CALL SYSTEM 53827 1 01438 3840 EQUIPMENT RENTAL 0000754763 01/11/18 01/11/18 26.03 MONTHLY ACTIVITY FEE - DEC. 2017 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
26.03
4
ast Goshen Township Fund Accounting
.eport Date . 01/11/18
iARP05 run by BARBARA 3 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
'ender Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
991 PSATS 53829 1 01401 3070 PSATS EXPENSE INV-30237-C4N2 2018 TOWNSHIP DUES 53829 2 01401 3070 PSATS EXPENSE INV-30237-C4N2 TWP. LEGAL DEFENSE PARTNERSHIP 53829 3 01401 3070 PSATS EXPENSE INV-30237-C4N2
NEW LAW SERVICE 2018 53829 4 01401 3070 PSATS EXPENSE INV-30237-C4N2 PA TWP. NEWS ARCHIVE 2017 53829 5 01401 3070 PSATS EXPENSE INV-30237-C4N2 PA TOWNSHIP NEWS SUBSCRIPTIONS - C, BATTAVIO, D.SHUEY, E.M.SHANE, J, EMANUEL, M.LYNCH & R.SMITH
1161 REILLY & SONS INC 53830 1 01430 2320 VEHICLE OPERATION - FUEL 134523 118.9 GALLONS GASOLINE 53831 1 01430 2320 VEHICLE OPERATION - FUEL 134522 364.8 GALLONS DIESEL
1203 SAFETY-KLEEN CORPORATION
3258
1783
53832 1 01430 2330 VEHICLE MAINT AND REPAIR PARTS WASHER SOLVENT
SENN REPAIRS 53833 1 01430 2330 VEHICLE MAINT AND REPAIR FREIGHLINER #41 REPAIR
STATE WORKERS INSURANCE FUND
75515025
3341
53835 1 01411 6000 VOLUNTEER FIREFIGHTER WORKERS COMP 122917 POLICY #05918452 INSTALL. 2 OF 11
550 XYLEM DEWATERING SOLUTIONS INC. 53837 1 01430 2600 MINOR EQUIP. PURCHASE 400768385 SUBMERSIBLE PUMPS & LAYFLAT HOSE
01/11/18 01/11/18 2,209.00
01/11/18 01/11/18 170.00
01/11/18 01/11/18 35.00
01/11/18 01/11/18 45.00
01/11/18 01/11/18 216.00
2,675.00
01/11/18 01/11/18 233.88
01/11/18 01/11/18 810.95
1,044.83
01/11/18 01/11/18 424.00
424.00
01/11/18 01/11/18 3,874.67
3,874.67
01/11/18 01/11/18 5,779.00
5,779.00
01/11/18 01/11/18 2,230.40
2,230.40
5
ast Goshen Township Fund Accounting
.eport Date. 01/11/18
IARP05 run by BARBARA 3 22 PM
'ender Req # Budget# Sub# Description
01 GENERAL FUND
1983 YALE ELECTRIC SUPPLY CO 53838 1 01409 3745 PW BUILDING - MAINT REPAIRS CIRCUIT BREAKER
1512 ZEP SALES & SERVICE 53839 1 01430 2330 VEHICLE MAINT AND REPAIR ZEP BIG ORANGE AEROSOL
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount
S109648910.001 01/11/18 01/11/18 75.00
75.00
9003193979 01/11/18 01/11/18 283.42
283.42
6
ast Goshen Township Fund Accounting
.eport Date, 01/11/18
IARP05 run by BARBARA 3 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
'endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
03 SINKING FUND
2442 KENT AUTOMOTIVE
3551
910
53814 1 03454 7450 CAPITAL PURCHASE - PARK & REC HEAVY DUTY SWIVEL CASTERS
MCMAHON ASSOCIATES INC. 53821 1 03460 7406 PAOLI PK.TRAIL - SEGMT.F PROF.SERVICE 10/28-12/1/17 SEGMT.F 53821 2 03460 7407 PAOLI PK.TRAIL - SEGMT.G PROF.SERVICE 10/28-12/1/17 SEGMT.G
US MUNICIPAL SUPPLY INC. 53836 1 03454 7450 CAPITAL PURCHASE - PARK & REC 3 DAY RENTAL - PICK UP TRUCK
9305479849 01/11/18 01/11/18 525.67
525.67
156651 01/11/18 01/11/18 412.50
156651 01/11/18 01/11/18 412.50
825.00
6125771 01/11/18 01/11/18 2,850.00
2,850.00
7
:ast Goshen Township Fund Accounting
lepot"t Date , 01/11/18
!ARP05 run by BARBARA 3 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
render Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERATING
3140 ACE DISPOSAL CORP 53787 l 05422 3701 R.C. COLLEC.-MAINT.& REPR PORTABLE TOILETS - DECEMBER 2017
151 BLOSENSKI DISPOSAL CO, CHARLES
128258
53789 l 05422 4502 R.C. SLUDGE-LAND CHESTER 16351 SWITCH 20 YDS WITH LINER 12/26/17
3872 EAGLE TERMITE & PEST CONTROL 53803 l 05422 3700 R.C. STP-MAINT.& REPAIRS EXTERM. SERVICE DEC. 2017 - RCSTP 53806 l 05420 3702 C.C. COLLEC.-MAINT.& REPR. EXTERM. SERVICE DEC. 2017 - ASHBRDG
583 HACH COMPANY
1005
1087
2099
53810 l 05422 3700 R.C. STP-MAINT.& REPAIRS DEIONIZED WATER, SULFURIC ACID, LATEX GLOVES & TNT
PENNSYLVANIA ONE CALL SYSTEM 53827 2 05422 3701 R.C. COLLEC.-MAINT.& REPR MONTHLY ACTIVITY FEE - DEC. 53827 3 05420 3702 C.C. COLLEC.-MAINT.& REPR. MONTHLY ACTIVITY FEE - DEC.
PIPE XPRESS INC. 53828 l 05422 3700 R.C. STP-MAINT.& REPAIRS 2 PVC GRAY COMPACT
SUBURBAN PROPANE 53834 l 05422 3701 R.C. COLLEC.-MAINT.& REPR 80. 4 GALLONS PROPANE
2017
2017
191023
191026
10772002
0000754763
0000754763
89547
2361-024766
01/11/18 01/11/18 150.00
150.00
01/11/18 01/11/18 181.00
181.00
01/11/18 01/11/18 45.00
01/11/18 01/11/18 25.00
70.00
01/11/18 01/11/18 2,700.28
2,700.28
01/11/18 01/11/18 26.03
01/11/18 01/11/18 26.02
52.05
01/11/18 01/11/18 14.86
14 .86
01/11/18 01/11/18 373.51
373.51
8
~ast Goshen Township Fund Accounting
leport Qat~ 01/11/18
WlP05 run by BARBARA 3 22 PM
Tender Req # Budget# Sub# Description
06 REFUSE
138 BFI-KING OF PRUSSIA RECYCLERY 53788 1 06427 4504 RECYCLING FEES DECEMBER 2017 RE-CYCLING FEES
BATCH 5 OF 5
Expenditures Register
GL-1801-61472
Invoice Number Req Date Check Dte Recpt Dte Check#
4586-000056853 01/11/18 01/11/18
PAGE
lunount
414.30
414.30
9
Sast Goshen Township Fund Accounting
~epo~t Date, 01/11/18
>!ARP05 run by BARBARA 3 22 PM
Expenditures Register
GL-1801-61472
BATCH 5 OF 5
PAGE
/endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
08 BOND FUNDS (CAPITAL PROJECTS)
3551 MCMAHON ASSOCIATES INC. 53822 1 08459 6003 SEGMENT C ENGINEERING 156573 PROF.SERVICE 10/28-12/1/17 SEGMT.C
FUND SUMMARY
Fund Bank Account Amount Description
01 01 03 03 05 05 06 06 08 08
56,460.46 GENERAL FUND 4,200.67 SINKING FUND 3,541.70 SEWER OPERATING 414.30 REFUSE 45,174.15 BOND FUNDS (CAPITAL PROJECTS)
109, 791.28
PERIOD SUMMARY
Period Amount
1801 109,791.28
109 I 791. 28
01/11/18 01/11/18 45,174.15
45,174.15
109 I 791. 28 0 Printed, totaling 109,791.28
10
ACH DEBITS TO GENERAL FUNDS
01 TRX#
61464
OS TRX#
61462
06 TRX#
61463
Amount
Charged
$80.00
$350.00
$350.00
Date
1/10/2018
12/31/2017
12/31/2017
ATTACHMENT 2 of 2
Meeting Date
1/16/2018
12/31/17 - 1/12/18
Name Description
PRIMEPAY MISC. EMPLOYEE BENEFITS
LOCKBOX FEES - DEC. 2017 LOCKBOX FEES FOR S/R ACCT.
LOCKBOX FEES - DEC. 2017 LOCKBOX FEES FOR S/R ACCT.
U:\BPhillips\EXPENSE REPT. ATTACH\MEETING DATE 1-16-17.xlsx
CASE NO.: 18-03-0229A THE HONORABLE E. MARTIN SHANE
CHAIRMAN, BOARD OF SUPERVISORS
TOWNSHIP OF EAST GOSHEN
COMMUNITY: TOWNSHIP OF EAST GOSHEN,
CHESTER COUNTY, PENNSYLVANIA · 1580 PAOLI PIKE COMMUNITY NO.: 420277 WEST CHESTER, PA 19380
DEAR MR. SHANE:
This is in reference to a request that the Federal Emergency Management Agency (FEMA) determine if the property described in the enclosed document is located within an identified Special Flood Hazard Area, the area that would be inundated by the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood), on the effective National Flood Insurance Program (NFIP) map. Using the information submitted and the effective NFIP map, our determination is shown on the attached Letter of Map Revision (LOMR) Floodway Determination Document. This determination docume,nt provides additional information regarding the effective NFIP map; the legal description of the property ·fill.d pur determination.
• • • • • .:. • '1 • • • : • ~ : _·; ;( ::;
Addition~! . docur;nen.ts .... l;ll't:l .. enclosed which provide information regarding the subject property and . ·" .. -·I . 'i· ... ·· > '.'.'..· • 1.-L~I . .. "· ·..:. . . LQMRs ... P.lease .. s·ee . the List. of Enclosures below to determine which documents are enclosed. Other
attac'1~nis .··~~~~ill~: t6 this·,· ieq~~~i · · ~ay be included as . referenced in the Determination/Comment document.·· · If you. have any . questions about . this letter or any of the enclosure~, please contact the FEMA Map Information eXchange (FMIX) toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Engineering Library, 3601 Eisenhower Ave Ste 500, Alexandria, VA 22304-6426.
Sincerely,
~~-~ Luis V. Rodriguez, P.E., Director Engineering and Modeling Division federal Insurance and Mitigation Administration
LIST OF ENCLOSURES:
LOMR-FW DETERMINATION DOCUMENT (REMOVAL) .
. . .. · . . • 1.· ... . cc: .State/C.omn1~.hweaith NFIP Coordinator ·. · '. ~=~il' ~J,)l~~~si0[J' '. : 2 : ';,; · / .· :
:.··:: ..
. .... : .·.: ; .-: ' . ., . . . .... . ... ,_
·Ms. Cheryl Lodowski
'! •' · .. ,, .·
• . : - 1
Page 1 of2 !Date: December 22, 2017 lease No.: 18-03~0229A I LOMR-FW •
Federal Emergency Management Agency
0 ""
Washington, D.C. 20472 ~
lVD S ~
LETTER OF MAP. REVISION FLOODWAY DETERMINATION DOCUMENT (REMOVAL)
COMMUNITY AND MAP PANEL INFORMATION LEGAL PROPERTY DESCRIPTION
Unit D-3, Parcel No. 53-6F-133, as described in the Deed recorded
.. TOWNSHIP OF !:AST GOSHEN,
CHESTER COUNTY, as Instrument No. 70552, in Book 4264, Pages 895 through 900, in PENNSYLVANIA the Office of the Recorder of Deeds, Chester County, Pennsylvania
,
COMMUNITY
COMMUNITY NO.: 420277
AFFECTED
Nl:JMBER~ ·42029C0215G'
MAP PANEL
DATE: 9/29/2017
I
FLOODING SOURCE: EAST BRANCH CHESTER CREEK ~PPROXIMATE LATITUD.E & LONGITUDE OF PROPERTY:39.959921, -75.545073
SOURCE OF LAT & LONG: LOMA LOGIC DATUM: NAO 83
DETERMINATION
OUTCOME 1%ANNUAL LOWEST LOWEST
WHAT IS CHANCE ADJACENT LOT
LOT 81,.0CK/ SUBDIVISION STREET REMOVED FROM FLOOD FLOOD GRADE ELEVATION SECTION THESFHA ZONE ELEVATION ELEVATION (NAVO 88) (NAVO 88) (NAVO 88) -- -- -- 703 Westtown Circle Structure x -- 316.8 feet -- (shaded)
Special Flood Hazard Area (SFHA) - The SFHA is an area that would be inundated by the· flood having a 1-percent chance of being equaled or exceeded in any Qiven vear (base flood).
ADDITIONAL CONSIDERATIONS {Please refer to the appropriate section on Attachment 1 for the additional considerations listed below.)
INADVERTENT INCLUSION FLOODWAY 1 SUPERSEDES PREVIOUS DETERMINATION
This ·document provides the Federal Emergency Management Agency's determination regarding a request for a Letter of Map Revision for the property described · above. . Using the infomiation submitted and the .effective National Flood Insurance Program (NFIP) map, we have determined tha_t the structure(s) on the property(ies) is/are npt locate\! in the NFIP regulatory floodway or the SFHA, an area inu.ndated by the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood). This document revises the effective NFIP map to remove the s1,1bject property from the NFIP regulatory floodway and the SFHA located on the effective NFIP map; therefore, the Federal mandatory flood insurance requirement does not apply. However, the lender has the option to continue the flood insurance requirement to protect its financial risk on the loan. A Preferred Risk Policy (PRP) is available for buildings loc.ated outside the SFHA Information about the PRP and how one can apply is enclosed.
This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange {FMIX) toll free at {877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Engineering Library, 3601 Eisenhower Ave Ste 500, Alexandria, VA 22304-6426.
'
__.----:;;> -
<:::::::.__.--_.)'
Luis V. Rodriguez, P.E., Director Engineering and Modeling Division Federal Insurance and Mitigation Administr(!tion
Page2 of2 Date: December 22, 2017 Case No.: 18-03-0229A
Federal Emergency Management Agency
Washington, D.C. 20472
LETTER OF MAP REVISION FLOODWAY· DETERMINATION DOCUMENT (REMOVAL)
ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS)
INADVERTENT INCLUSION IN THE FLOODWAY 1 (PORTIONS OF THE PROPERTY REMAIN IN THE FLOODWAY) (This Additional Consideration applies to the preceding 1 Property.)
LOMR-FW
A portion of this property is located within the National Flood Insurance Program (NFIP) regulatory floodway for the flooding source indicated on the Determination Document, while the subject of this determination is not. The
NFIP regulatory floodway is the area that must remain unobstructed in order to prevent unacceptable increases in base.flood elevations. Therefore, no construction may take place in.an NFtP regulator/ .floodway·th_at may cause an increase in the base flood elevation, and any future construction or substantial improvement on the property remains subject to Federal, State/Commonwealth, and local regulations for floodplain management. The NFIP regulatory floodway is provided to the community as a tool to regulate floodplain development. Therefore, the NFIP regulatory floodway modification described in the Determination Document, while acceptable to the Federal Emergency Management Agency (FEMA), must also be acceptable to the community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of the NFIP regulations. Any proposed revision to the NFIP regulatory floodway must be submitted to FEMA by community officials. The community should contact either the Regional Director (for those communities in Regions I-IV, and Vl-X), or the Regional Engineer (for those communities in Region V) for guidance on the data which must be submitted for a rev.ision to the NFIP regulatory floodway. Contact information for each regional office can be obtained by calling the FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or from our web site at
http://www.fema.gov/about/regoff. htm.
SUPERSEDES OUR PREVIOUS DETERMINATION (This Additional Consideration applies to all properties in the LOMR-FW DETERMINATION DOCUMENT (REMOVAL)) This Determination Document supersedes our previous determination dated 3/28/2000, for the subject property.
. . . This attachment provides additional information regarding this request. If you have any questions about this attachment, p_lease contact the FEMA Map Information exchange (FMIX) toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Engineering Library, 3601 Eisenhower Ave Ste 500, Alexandria, VA 22304-6426.
~-_:>
Luis V. Rodriguez, P.E., Director Engineering and Modeling Division Federal Insurance and Mitigation Administration
Memo
To: Board of Supervisors
From: Joanne Morgan Re: Right-to-Know Quarterly Report
October-November-December 2017
Kirk Leister 419 Cheney Road Columbia Crossroads, PA 16914
Mr. Leister requested by the standard Right-to-Know a ledger or spreadsheet showing activity including balances, date of initial deposit, disbursements and addresses for a fire damaged property escrow account. An e-mail message was sent to Mr. Leister stating that we did not have any information.
Maureen Ruoff PO Box 1322 Paoli, PA 19301
Ms. Ruoff filled and a standard Right-to-Know Request requesting property record for 911 St. Andrews Drive, Malvern, PA. Ms. Ruoff reviewed the property files for 911 St Andrews Drive on October 2, 2017.
Lisa Dyer 555 Lancaster Avenue Berwyn, PA 19312
Ms. Dyer submitted a Standard Right-to-Know request asking for a monthly summary of residential building permits for all new construction of houses renovations or additions issued in September 2017. An e-mail was sent to Ms. Dyer telling her the website address of the monthly building report.
F:\Data\Shared Data\Admin Dept\RFl\2017\Q Report Oct Nov Dec 2017.docx
Barbara Diestelow 1786 Suffolk Downs West Chester, PA 19380
Ms. Barbara Diestelow submitted a Standard-Right-to-Know Request Form requesting information on plans for her sunroom that was done in 2008. She requested to see the complete building records that were submitted by McFalls Construction prior to the construction. Information regarding the plan request was e-mailed to Ms. Diestelow.
Michael MacDonald 114 E 8th Avenue Conshohocken, PA 19428
Mr. MacDonald submitted a Right-to-Know request for the residential building permits approved for the months of August and September 2017. Mr. Smith e-mailed the Township website link as to where the building permits are located.
Kenneth Deloian fbo SmartProcure 700 W. Hillsboro Blvd. Suite 4-100
Deerfield Beach, FL 33313
Mr. Deloian submitted a Standard Right-To-Know request form requesting any or all electronically maintained purchasing records dated 2017-07-21 to current date. A report of vendor information was sent October 25, 2017 by e-mail from Barbara Phillips.
Matt Perna 9 Howarth Avenue Media, PA 19063 610-246-6143 mperna@mattersaw.com
Mr. Perna filled out a Standard Right-to-Know Request asking for plot plan information for 315 Franklin Court. Plot plan information was e-mailed to Mr. Perna.
F:\Data\Shared Data\Admin Dept\RFl\2017\Q Report Oct Nov Dec 2017.docx
Lisa Dyer SSS Lancaster Avenue Berwyn, PA 19312 610-648-0922 Lisa Dyer@Gunton.com
Ms. Dyer submitted a Standard Right to Know Request asking for the monthly summary of residential building permits for all new construction of houses, renovations and additions issued in October 2017. An e-mail was sent to Ms. Dyer that the information is posted on the East Goshen Township website.
James Carey SllS Pegasus Court, Suite F Frederick, MD 21704 301-972-4660 jca rey@besti nspectio ns.com
Mr. Carey sent in a Standard Right-to-Know Request Form requesting records of outstanding code violations, and copies of certificates of occupancy. Information was sent to Mr. Carey as requested and a statement stating there was no outstanding violations.
Peggy Skillern 3000 S. Berry Road, Suite lSO Norman, OK 73072 800-787-8390 ps~illern@blockandclark.com
Ms. Skillern field a Standard Right-to-Know Request form asking for property information on 1302 Goshen Parkway The information request was a zoning verification letter; information on code violations, variance and permit information, site plans, and copies of certificates of occupancy. Property information was mailed to Peggy Skillern.
Philip R. Castagna, Jr. Rawle & Henderson The Widener Building One South Penn Square Philadelphia, PA 19107 21S-S7S-4374 pcastagna@rawle.com
Mr. Castagna submitted a Standard Right-to-Know Request asking for all documentation related to the construction of 123S Great Oak Circle, West Chester, PA 19380 including all permits, certificates of use, inspections, plans schematics and supporting documentation. Mr. Smith answered Mr. Castagna's and sent him information regarding his request for that documentation.
F:\Data\Shared Data\Admin Dept\RFl\2017\Q Report Oct Nov Dec 2017.docx
Donald C. Cramer 11 Silver Avenue Glassboro, NJ 08028
Mr. Cramer requested on the Standard Right-To-Know request information pertaining any copies of information on files and permits, inspections code regulations on the underground and aboveground storage tanks located at ZEKS Compressed Air Solutions, 1302 Goshen Parkway. An e-mail was forward to Mr. Cramer pertaining to any records we had on the storage tanks.
Patrick Loftus, Esquire Duane Morris 30 South 1ih Street Philadelphia, PA 19103
Mr. Loftus requested information pertaining to Noise Control Ordinance pertaining to Sunoco. Information regarding the cost and the delivery of records was sent to Mr. Patrick Loftus. The cost would be made payable to East Goshen Township for $252.25.
Terence & Rosemary James 1432 Grand Oak Lane West Chester, PA 19380
Mr. & Mrs. James requested plot plan and permit record information for their property at 1432 Grand Oak Lane pertaining to an addition.
Joan MacMullen 4 Harrison Road West West Chester, PA 19380
Ms. MacMullen requested liability insurance information of Bachman's Roofing Company. The information was provided to Ms. MacMullen from our Building and Code Department
F:\Data\Shared Data\Admin Dept\RFl\2017\Q Report Oct Nov Dec 2017.docx
Tiffany Moon 467 Swan Avenue Hohenwald, TN 38462 188-284-7437 ext. 124 tmoon@olivertechnologies.com
Ms. Tiffany Moon filed out a standard right-to-know request form requesting copies of all building permit applications issued in East Goshen Township for manufactured homes; both new and used. This would be from July 1, 2016 to June 30, 2017. Information was sent to Ms. Moon telling her that she could pick up information on building reports on our website. She was also told that we did not issue any permits for manufactured homes for the time period she requested.
Ms. Lisa Dyer 555 Lancaster Avenue Berwyn, PA 19312
Ms. Dyer submitted a Standard Right-to-know request form requesting a monthly summary of residential building permits for all new construction of houses, renovations or additions issued in November 2017. Ms. Dyer was e-mailed the East Goshen Township website information of where to obtain the monthly building report.
F:\Data\Shared Data\Admin Dept\RFl\2017\Q Report Oct Nov Dec 2017.docx