Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA Page -1- MARCH 20, 2018

AGENDA EAST GOSHEN TOWNSHIP

BOARD OF SUPERVISORS

Tuesday, March 20, 2018

7:00 PM 6:00 PM Executive Session – Legal Matter and Real Estate Matter 1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chairman’s Report a. The Board met in executive session prior to tonight’s meeting to discuss a legal matter and real estate matter. b. There are two weeks remaining in the Friends of East Goshen Buy a Brick program. It will end on Saturday, March 31st after the Egg Hunt. Tax-deductible $100 bricks can be purchased online at https://polarengraving.com/FriendsofEastGoshenInc or in-person at the Township Building. 6. Public Hearing - none 7. Emergency Services Reports WEGO – Chief Brenda Bernot Goshen Fire Co – none Malvern Fire Co – February Good Fellowship – February Fire Marshal – Report on Hazardous Material Awareness 8. Financial Report - February 9. Old Business 10. New Business a. Presentation on Citizens’ Risk Assessment b. Consider recommendation on Natural Lands Pond Study c. Consider recommendation on Paoli Pike Trail Segment B Grants d. Consider recommendation on Community Day Activities e. Consider recommendation on Wash Bay f. Consider recommendation for Mower Replacement g. Consider recommendation for Roller Replacement h. Consider recommendation for King Road and Sproul/North Chester Road Intersection i. Consider recommendation for Updated Agreement with the Goshen Fire Company j. Consider recommendation for Stormwater Agreement for 38 Meadow Creek Lane 11. Any Other Matter 12. Approval of Minutes a. March 6, 2018 13. Treasurer’s Report – March 15, 2018 14. Liaison Reports -none 15. Correspondence, Reports of Interest

AGENDA Page -2- MARCH 20, 2018

a. March 2, 2018 – Notification of Township’s intention to apply for an NPDES Permit for the Paoli Pike Trail. 16. Public Comment 17. Adjournment Meetings & Dates of Importance Mar 30, 2018 Township Office Closed ----------- Mar 31, 2018 Egg Hunt 10:00am Apr 03, 2018 Board of Supervisors 07:00pm Apr 04, 2018 Planning Commission 07:00pm Apr 05, 2018 Parks and Recreation Commission 07:00pm Apr 09, 2018 Municipal Authority 07:00pm Apr 10, 2018 Board of Supervisors 07:00pm Apr 11, 2018 Conservancy Board 07:00pm Apr 12, 2018 Historical Commission 07:00pm Apr 14, 2018 Washington D.C. Trip ----------- Apr 16, 2018 Futurist Committee 07:00pm Apr 17, 2018 Board of Supervisors 07:00pm Apr 21, 2018 Keep East Goshen Beautiful Day 08:00am Apr 25, 2018 Zoning Hearing Board 07:00pm

Newsletter Deadlines for Summer of 2018: May 1st The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant. Public Comment – Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting.

Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the “E-notification & Emergency Alert” button on the left side of the homepage. Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today! Smart 911 - Smart911 is a new service in Chester County that allows you to create a Safety Profile at www.smart911.com that includes details you want the 9-1-1 center and public safety

AGENDA Page -3- MARCH 20, 2018

response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members’ allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search start faster. F:\Data\Shared Data\Agendas\Board of Supervisors\2018\032018 Meeting.doc

January:

Malvern Fire Company 424 East King Street Malvern, PA 19355

East Goshen Township

2018 EMS Statistics

42 Calls; 3 BLS (3 Transports); 39 ALS (29 Transports)

February:

32 Calls; 2 BLS (1 Transport); 30 ALS (28 Transports)

Main 610-64 7-0693 Fax 610-647-0249 www.malvemfireco.com

Cover page. Logo of the Ambulance & EMS Training Institute, Good Fellowship: an ambulance in front of a Star of Life and a red arc, with the words "AMBULANCE & EMS Training Institute" curved around the top and "Good Fellowship" on a red banner below.

February 2018 Operations Report

!Vlunicipality Count

West Chester 158

West Goshen 139 - East Goshen 50 -- East Bradford 41 - -- Westtown 40

West Whiteland 24 ----- West Bradford 20

Thornbury_ 10

Birmin~ ha ~ 5

Pocopson 4

Willistown 4 -- Valley 1

496

19 18 17

~ .. ..

12 10 11 11

~ ... ... ., ~ }1

I•·

/ ~ - 1 -

::: ...

Call Volume

I% Of Calls

31.9% -I

j

1 I I

I

13 .

28.0% 10.1% 8.3% 8.1% 4.8% 4.0% 2.0% 1.0% 0.8% 0.8% ----

Non-Transport Breakdown

Refusal I Recalled Enroute

40 21

Recalled On Scene

No Services

Lift Assist

DOA

27 35

16 r--3

142

Total Call Volume By Hour

35 .. 31 27 " 28

~

28 25 .. 7 ,.,.

~ 21 ''>' 19 ... "' ,',

~· ... ;

~ ' ; - f-- pi f-- f--

25 24 22 23 23 .. ... 21 .. .. 19 ,~ · .

~

14

r1 '~

~ ~ - - f-- f-- f-- - ~ ~ ~ -

Vehicle Utilization

VehicleCalls
Ambulance 55A172
Ambulance 55B30
Ambulance 55C143
Ambulance 55D14
Ambulance 55E54
Ambulance 55F0
Medic 55A70
Medic 55B7
Supervisor6
Total496

Bar chart titled Call Volume by Vehicle: Ambulance 55A 172, 55B 30, 55C 143, 55D 14, 55E 54, 55F 0, Medic 55A 70, Medic 55B 7, Supervisor 6.

Hospital Destination Information

DispositionTotal%
Chester County Hospital27154.6%
No Transport14328.8%
Paoli Hospital7214.5%
Paoli Hospital (Trauma Alert)51.0%
Brandywine Hospital30.6%
Bryn Mawr Hospital10.2%
Nemours AI duPont Hospital10.2%
496
Transported:353
No Transport:143
496

Pie chart labels: Chester County Hospital 55%; No Transport 29%; Paoli Hospital 14%; Paoli Hospital (Trauma Alert) 1%; Brandywine Hospital 1%; Bryn Mawr Hospital 0%; Nemours AI duPont Hospital 0%.

Miscellaneous Call Information

Covering Other Agencies

Organization I Covers

Goshen Fi~e Co j 12 Malvern Fire Co 5

Longwood Fir~ Co I 4

Minquas Fire Co l 4

Uwchlan Ambulance I 3

28

Average Times

Dispatch To En route I 1.44

En route To On Scene I 6.53 - - On Scene Time I 13.84 ---

I

- Transport Ti me 9.71

Dispatch To Available 39.11

Call Types

Fall I Lift Assist

Sick Person

Respiratory Difficulty

Overdose

Accident - BLS

Chest Pain

Emotional Disorder

Heart Problems

Abdominal Pain

Syncope

U"!_!'esponsive Person

l~u_red Person

Stroke/CV A

Unconscious Person - -- - Accident - Entrapment

Seizures

Hemorrhaging

Stan~ By- Fire

Unknown Nature

Allergic/ Medication Reaction

Diabetic Emergency

Back Pain

Accident - ALS

DOA

Hyp~ Tension

Laceration

Hyper Tension

Assault

Choking

Cardiacf Resp Arrest

Alarm - Medical BLS

Alarm - Carbon Monoxide

Well Person Check

Neurological I Head Injury

Non-Emergency EMS Trans

Poisoning

I ~5 j r :~ I

38 I

31

27

24 I 23 j 18

18 16

13.1%

10.5%

9.9%

7.7%

6.3%

5.4%

4.8%

4.6% 3.6%

3.6% 3.2% I 16 3.2%

1

14 2.8% l 4 2.8%

1

190 2.0% 1.8%

I

I 8 8 1.6% 1.6% l 7 l 1.4%

I

6 I 1.2%

l 5

6 1 1.2% I 1.0% I 5 1.0% I 4 o.8% I ;_ -~::~

3 0.6%

2

2

2

1

1

1

1

1

0.4% 0.4% 0.4% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2%

I I I I THE PEN I S E E

hereby congratulates Carmen Battavio

upon successfully completing 4 hours of approved instruction in the course

Hazardous Materials Awareness (HMAJB)

Location: Chester county

Date: 21111201s

COMMONWEALTH OF PENNSYLVANIA

Tom Wolf, Governor

Mike Stack, Lt. Governor

Instructors:~ -----------

PENNSYLVANIA STATE FIRE ACADEMY

Bruce Trego, Acting State Fire Commissioner I

Fire Training Administrator

Memo

To: Board of Supervisors From: Jon Altshul Re: February 2018 Financial Report Date: March 9, 2018

Net of pass-through accounts, as of February 28th, the general fund had revenues of $1,877,087 and expenses of $1,758,175 for a year-to-date deficit of $118,912. Compared to the YTD budget, revenues were $55,430 over budget and expenses were $15,547 over budget for a positive budget variance of $39,883. As of February 28th, the general fund balance was $5,396,557.

On the expense side, Administration, Emergency Services and Public Work are all under budget, while Parks and Recreation and Codes are both slightly over budget. Of particular note, Administration was under-budget by $42,127 due primarily to higher-than-expected insurance proceeds. On the revenue side, Earned Income Tax, Real Estate Tax and Other Income were all slightly over budget, while Real

Estate Transfer Tax, Local Services Tax and Franchise Fees were slightly under budget.

Other funds

• The State Liquid Fuels Fund had $1 in revenues and $0 expenses. The fund balance was $503.

Note that the 2018 allocation from the state was made in early March. • The Sinking Fund had $3,380 in revenues and $150,986 in expenses. The fund balance is $5,876,425. • The Transportation Fund had $873 in revenues and $0 in expenses. The fund balance is $1,080,030. • The Sewer Operating Fund had $762,339 in revenues and $451,949 in expenses. The fund

balance is $1,197,063. • The Refuse Fund had $221,181 in revenues and $156,565 in expenses. The fund balance is $678,744. • The Bond Fund had $15,357 in revenues and $56, 707 in expenses. The fund balance is $7,294,972. • The Sewer Sinking Fund had $1,332 in revenues and $15,358 in expenses. The fund balance is $2,148,652. • The Operating Reserve Fund had $1,171 in revenues and no expenses. The fund balance is $2,505,526.

Finally, I would like to schedule the long-range budget planning session for Wednesday, May 23rd at 10am. Please advise if this date and time does not work for you.

EAST GOSHEN TOWNSHIP

GENERAL FUND SUMMARY

As of February 28, 2018

Annual YTD YTD

Account Title Budget Budget Actual Variance

EMERGENCY SERVICES EXPENSES 4,101,440 928,286 929,095 (809)

PUBLIC WORKS EXPENSES 2,637,576 353,128 348,930 4,198

ADMINISTRATION EXPENSES 2,218,972 329,133 335,789 (6,656)

CODES EXPENSES 465,911 71,546 77,546 (6,000)

PARK AND RECREATION EXPENSES 690,256 42,232 48,510 (6,278)

TOTAL CORE FUNCTION EXPENSES 10,114,155 1,724,325 1,739,871 (15,546)

EMERGENCY SERVICES REVENUES 77,628 5,080 6,099 1,019

PUBLIC WORKS REVENUES 1,010,195 2,646 510 (2,136)

ADMINISTRATION REVENUES 334,024 35,875 84,678 48,803

CODES REVENUES 259,725 30,885 36,261 5,376

PARK AND RECREATION REVENUES 140,976 12,516 13,892 1,376

TOTAL CORE FUNCTION REVENUES 1,822,548 87,002 141,440 54,438

NET EMERGENCY SERVICES 4,023,812 923,206 922,996 210

NET PUBLIC WORKS 1,627,381 350,482 348,420 2,062

NET ADMINISTRATION 1,884,948 293,258 251,111 42,147

NET CODES 206,186 40,661 41,285 (624)

NET PARK AND RECREATION 549,280 29,716 34,618 (4,902)

lcoRE FUNCTION NET SUBTOTAL 8,291,607 1,637,323 1,598,431 38,8921

DEBT - PRINCIPAL 549,000 0

DEBT - INTEREST 249,458 18,303 18,305 (2) I TOTAL DEBT 798,458 18,303 18,305 (2)1

!TOTAL CORE FUNCTION NET 9,090,065 1,655,626 1,616,735 38,891 I

NON-CORE FUNCTION REVENUE

EARNED INCOME TAX 5,181,600 934,463 938,065 3,602

REAL ESTATE PROPERTY TAX 2,026,129 494,404 498,012 3,608

REAL ESTATE TRANSFER TAX 575,000 95,833 95,342 (491)

CABLE TELEVIS.FRANCHISE 489,600 122,400 116,620 (5,780)

LOCAL SERVICES TAX 348,000 76,491 75,438 (1,053)

OTHER INCOME 469,736 11,064 12,171 1,107

I TOTAL NON CORE FUNCTION REVENUE 9,090,065 1,734,655 1,735,648 9931

NET RESULT 0 79,029 118,912 39,883

U:\JAltshul\Quarterly reports\Ql 2018\2018 -2 - General Fund Summary.xlsx

RECEIP 310 320 330 340 350 360 380 390

01/01/18 BEGINNING BALANCE

TS

TAXES LICENSES & PERMITS FINES & FORFEITS INTERESTS & RENTS INTERGOVERNMENTAL CHARGES FOR SERVICES MISCELLANEOUS REVENUES OTHER FINANCING SOURCES

ITURES EXPEND 400 GENERAL GOVERNMENT 410 PUBLIC SAFETY 420 HEAL TH & WELFARE 426 SANITATION & REFUSE 430 HIGHWAYS.ROADS & STREETS 450 CUL TU RE-RECREATION 460 CONSERVATION & DEVELOPMENT 470 DEBT SERVICE 480 MISCELLANEOUS EXPENDITURES 490 OTHER FINANCING USES

2018 SURPLUS/(DEFICIT)*

CLEARING ACCOUNT ADJUSTMENTS

02/28/2018 ENDING BALANCE

U:\bmccool\201BIAll Funds Summary\2018-02 All Funds Summary.xlsx

SUMMARY OF FUNDS REPORT (AKA "JOE REPORT")

ALL FUNDS FEBRUARY 2018 *NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS

GENERAL LIQUID FUELS SINKING TRANSPORT. SEWER OP. REFUSE FUND* STATE FUND FUND FUND FUND FUND

$5,531,289 $502 6,024,031 1,079,157 886,672 614,128

$1,730,824 $0 $0 $0 $0 $0 $330 $0 $0 $0 $0 $0 $6,099 $0 $0 $0 $0 $0 $30,029 $1 $3,380 $873 $521 $692 $26,060 $0 $0 $0 $0 $0 $63,832 $0 $0 $0 $761,819 $220,489 $30,486 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$1,887,661 $1 $3,380 $873 $762,339 $221,181

$226,050 $0 $28,228 $0 $0 $0 $1,216,031 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,007 $0 $0 $0 $395,467 $156,565 $286,462 $0 $75,706 $0 $0 $0 $40,909 $0 $46,227 $0 $0 $0 $219 $0 $825 $0 $0 $0 $18,922 $0 $0 $0 $56,481 $0 $199,327 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$2,008,927 $0 $150,986 $0 $451,949 $156,565

($121 ,266) $1 ($147,606) $873 $310,391 $64,616

($13,467)

$5,396,557 $~ $5,876,425 $1,080,030 $1,197,063 $678,744

Page 1of1

SEWER SINK OPERATING TOWNSHIP MUNICIPAL BOND FUND RESERVE FUNDS AUTHORITY FUND

$2,162,678 $2,504,354 $18,057, 119 $142,331 7,336,323

$0 $0 $1,730,824 $0 $0 $0 $0 $330 $0 $0 $0 $0 $6,099 $0 $0 $1,332 $1, 171 $37,999 $462 $15,357 $0 $0 $26,060 $0 $0 $0 $0 $1,046,140 $846 $0 $0 $0 $30,486 $423 $0 $0 $0 $0 $0 $0

$1,332 $1,171 $2,877,939 $1 ,731 $15,357

$0 $0 $254,278 $0 $0 $0 $0 $1,216,031 $0 $0 $0 $0 $0 $0 $0 $15,358 $0 $588,397 $53,368 $0 $0 $0 $362,168 $0 $0 $0 $0 $87,137 $0 $56,707 $0 $0 $1,044 $0 $0 $0 $0 $75,403 $0 $0 $0 $0 $199,327 $0 $0 $0 $0 $0 $0 $0

$15,358 $0 $2,783,785 $53,368 $56,707

($14,026) $1,171 $94,154 ($51 ,637) ($41 ,351)

$2,148,652 $2,505,526 $18,883.500 I $90,694 $7,294,972

3/912018

©o~o~@w@

9

~o@~~

&@@@@@IJUU@ llil~

Public Input for Determining Risk Assessment Needs

A comprehensive list of public input and discussions

from various community meetings

Citizens' Risk Assessment Initiative

March 2018

ISSUED BY

Citizens' Risk Assessment Committee

Contact: riskassessmentcommittee@gmail.com

REPRESENTATIVE

Seth Kovnat, Project Engineer Tom Casey, Risk Assessment Chair

Introduction

Del-Chesco United for Pipeline Safety is a nonpartisan, fact-based, grassroots coalition of

locally-based safety and advocacy groups (like Protect Penn Delco, Middletown Coalition for

Community Safety, Goshen United for Public Safety, West Whiteland Residents for Safety,

Uwchlan Safety Coalition, Upper Uwchlan Residents for Safety. Wallace Safety Coalition and

East Goshen Safety and Environmental Advocates), are made up of concerned residents from

across Pennsylvania. Del-Chesco United's mission is to unite people through education

and to encourage our elected officials to make informed policy decisions for the safety

and well-being of our communities.

The Risk Assessment Initiative will use the data from the Quantitative Risk Assessment

(QRA) in an attempt to answer all known questions and concerns that the public has

inquired about over the past 4 years. The research will undoubtedly produce new

questions once the modeling data and reports are revealed. This is an ongoing assessment

process and some uncertainties will remain once the data is collected, but this QRA is the

critical first step.

Funding Support

We need your help. Please make a contribution to this effort by choosing a direct payment

at our GO FUND ME account,

https://www.gofundme.com/citizens039-risk-assessment-of-me2

Or you can contribute to this effort by making a donation to CLEAN AIR COUNCIL and

designate your contribution to the "Citizens' Risk Assessment: Mariner East". By making

your contribution through Clean Air Council, your donation will be tax deductible and you

will receive an annual membership to CAC as thanks for being a part of this Citizens'

project. Your contribution will go 100% in full to the study.

http:Ucleanair.org/donate/

Citizens' Risk Assessment Initiative Public Input 1

Public Input

Our process is to review all the factors that RISKS from pipelines bring to all communities.

Especially when we are dealing with a company that has a less than stellar performance

that could pose higher risks to Health, Safety, & Welfare.

Three Main Risk Categories:

LIFE

1. Loss of Life

a. Risk from explosions

i. Measure from varying levels underground

ii. Public infrastructure issues, ie. sewer systems

b. Risk from leaks

i. Both pipeline and above ground facilities

c. Risk from Horizontal Directional Drilling

i. HOD to this extent has never been done

ii. Potential impacts on communities

2. Health Concerns

a. Air

i. Flares, leaks, fire

b. Water

i. Wells, aquifers, public water

c. Ground

i. Farms, soil, erosion

d. Personal

i. Psychological impacts to community

1. Stress

2. PTSD type symptoms

3. Feelings of fear/hopelessness

ii. Noise issues & their effects on health

1. Lead to high blood pressure & heart attacks

2. Developmental issues in children

Citizens' Risk Assessment Initiative Public Input 2

3. Injury

a. Fire

b. Flying debris from over pressurization or explosion

c. Self-evacuation concerns

PROPERTY

1. QRA output will provide risk of damage as a function of distance from the pipeline

a. Have actuary in the real estate field take the risk data and quantify property

damage risk in dollars for specific predetermined locations

i. Huggins Actuarial located in Media (One example)

http://hugginsactuarial.com/

b. Consideration of an economics report on the negative impacts from the

pipeline to compare to the Sunoco commissioned "all positive" economics

report.

i. Would need input data from Sunoco's source material to compare

c. lnsurability of property

2. Home values vs. Negative Stigmas

a. Get a nationally recognized Appraiser to report on issues surrounding

pipeline development and operations

i. speak with John Hosey from Shelterfield (has access to national

numbers) http://www.shelterfield.com/

1. John evaluated the ME1 flaring tower and gathered credible

nationally collected data

2. Use the Actuary report to get appraisal issues from national

sources

3. Assess negative stigma associated with catastrophic events

around the country.

3. Insurance concerns

a. Homeowners policy renewals

b. Homeowner Association issues (HOAs)

i. What happens to premiums

ii. Need to get information from Andover insurer

4. Zoning issues

a. How does a pipeline alter zoning districts?

Citizens' Risk Assessment Initiative Public Input 3

b. What is the impact to Municipal & County Comprehensive Planning

5. Quantify loss of different types of property

a. Value of lost homes and buildings

i. Quantify based on site specific impact radius (examples)

1. CC Library Exton I Exton Mall

2. Wellington and/or church zone

3. Rt. 202 & Boot rd. (impact to loss of business)

4. Marchwood neighborhoods

5. Rt. 1 crossing/Granite Farms

6. Glenwood/Riddlewood neighborhoods

7. Aston/ Judy Way area

8. Marcus Hook

9. Glenwood Elementary

10. Boot Road Intersection near Wellington & Church/school

b. Value of lost business revenues

i. Rt. 202 & Boot road corridor (UPS, QVC, bus. parks)

ii. Eagleview area

111. Exton mall and businesses on Rte. 100

iv. Goshen Corporate Centers

v. Aston (esp. ME1)

c. Value of lost schools

i. Chester Cty, get specific examples

ii. Delco, get specific examples

ENVIRONMENT

1. Impacts from HOD to wells, aquifers, lakes, streams

a. Get depths of public and private aquifers in the region

b. Value of lost well water

c. Value of contaminated or drained aquifers

2. Loss of wetlands; increased flooding

3. Loss of tree cover and habitat due to right-of-way clearing

4. What are the concerns regarding air issues

a. Consult with Clean Air Council

5. Various geologic issues for Mariner East path

Citizens' Risk Assessment Initiative Public Input 4

a. Karst topography concerns from drilling

b. Sinkholes & subsidence (gradual sinking of an area of land)

c. Regional geologic information

Risk/Benefit Analysis

• What benefits are claimed by industry/Sunoco?

• What assurances does industry/Sunoco give about the risks?

• What are the actual benefits when correlated to the QRA?

• What are the actual risks per QRA?

• Better understanding for community.

• Better understanding for municipalities.

• Factual data for individuals to assess personal risk.

• A more informed community overall.

Conclusion

The community has engaged in the process of trying to understand the risks we are all

facing with regards to pipeline development in our communities. They have spoken up at

countless township meetings, public events sponsored by the industry, public & private

events sponsored by community groups, and even traveled to the state capital to engage

with the governor of Pennsylvania and other state representatives. But the questions still

remain. What are the risks? What should I do in the event of a gas release? What is the

impact to our community? What will happen afterwards? How will these projects impact

my home value? These questions, and many more, demand answers. The Citizens' Risk

Assessment will attempt to answer them, so that the public & municipalities understand

the risks we are being forced to live, work, shop, travel, and play in & around.

Citizens' Risk Assessment Initiative Public Input 5

Process Flowchart

STEP 1: CRITERIA AGREEMENT OF TERMS

STEP2:Q~RA~~~~~--:-::--~~~~~~~~~~~-=========:--i PER LEAK LEAK QUANTIFIED RISK

(DISTANCE F..ROM

.PIPELINE)

FORMED BY • PROBABILITY CONSEQUENCE INDUSTRY RESPECTED SIMUIATIONS (FEDERAL DATA; COMPANY (OR 2) HVL-SPECIFI

STEP 3: INDIVIDUAL RISK INDIVIDUAL

DISTANCED FROM PIPELINE RISK OF HARM

Citizens' Risk Assessment Initiative

STEP 4: SOCIETAL RISK LOCATION-SPECIFIC CUMULATIVE FREQUENCY OF ACCIDENT WITH VARYING TOTAL HARM

INDIVIDUAL

RISK OF PROPERTY

DAMAGE

FREQUENCY OF EVENTS VS. TOTAL

PROPERTY

DAMA~E{$

COMPARE QUANTIFIED

RISK ASSESSMENT

TO PREDEFINED ACCEPTANCE CRITERIA?

RISK OF ENVIRONMENTAL

DAMAGE ~-.....

Public Input 6

Appendix

Links for comparison assessments

Explanation of F-N plot (Societal Risk)

http://onlinelibrary.wiley.com/doi/10.1002/9780470552940.app1/pdf

http:ijproceed i ngs.esri .com/Ii bra ry/userconf /petrol 16/pa pers/petrol 22.pdf

http://www.chem i nst.ca/s ites/defa u lt/fi I es/pdfs/Co n nect/PM S/Pi pel i ne%200 RA.pdf

http:Uwww.pipelinerisk.com/pdf /Enhanced PL Risk Assess Part 2%20rev3.3.pdf

http://www.windot.com/docs/federal/ntsb/PHMSA research/pdf/DTPH5615T00003L -

Criticatl Review of Candidate Pipeline Risk Models - Final Report.pdf

http://www.dec.ny.gov/docs/legal protection pdf/20120216questqra.pdf

http:ijwww.penspen.com/wp-content/uploads/2014/09/risk-assessment-new-guidelines

.pdf

http://www.middletowncoalition.org/copy-of-sen-killion-rep-quinn-lette

Citizens' Risk Assessment Initiative Public Input 7

©o~o~@w@~

[KSo~lli ~

&~~@~~UCfi)@[jj)~

Quantitative Risk Assessment

Request For Proposal: Scope of Work

Citizens' Risk Assessment Initiative

March 2018

ISSUED BY

Citizens' Risk Assessment Committee

Contact: riskassessmentcommittee@gmail.com

REPRESENTATIVE

Seth Kovnat, Project Engineer Tom Casey, Risk Assessment Chair

Introduction & Background

The Citizens' Risk Assessment Initiative is accepting proposals in response to this Request for Proposal (this "RFP," or this "Request for Proposal") in order to find qualified firms to quantify the risk associated with operation of artificially liquefied Ethane, Propane, and Butane pipelines in densely populated areas. This data-driven Quantitative Risk Assessment (QRA) will use simulations and statistical likelihood to quantify and assess risk, comparing the results to risk acceptance criteria. The goal of this QRA is to evaluate the risk of highly volatile liquids (HVL) transmission pipelines routed through densely populated areas.

A proposed pipeline project seeks to operate and install 3 co-located HVL transmission pipelines through densely populated suburban Philadelphia. The unique risks to public safety that come with running artificially liquefied, highly combustible gas transmission pipelines through high consequence areas have yet to be adequately assessed. The route was chosen in order to reuse or parallel existing Rights of Way (ROW), but with no federal

route oversight (due to classification as an intrastate hazardous liquids pipeline) and no state route oversight (due to Pennsylvania not having a regulatory body responsible for pipeline routing).

The objective of this Request for Proposal is to identify a source that will provide the best overall result to the Citizens' Risk Assessment Initiative. While price is a significant factor, other criteria will form the basis of our award decision, as more fully described in the

Evaluation Factors section of this Request for Proposal.

The main goals of this assessment project are:

1. To address the risks & impacts of pipeline development on the identified three

main risk categories -- LIFE, PROPERTY, and ENVIRONMENT.

2. To help to define unknown risk factor data, then compare/contrast to already

established industry risk data.

3. To understand the level of risks posed on each of the three risk categories, and

compare it to already established acceptable levels of risk.

4. To provide a risk assessment that is readily available to the general public.

Citizens' Risk Assessment Initiative QRA Scope of Work 1

Project Scope

The scope of the project entails Quantitative Risk Assessment for Natural Gas Liquids

pipelines. The Mariner East Project pipeline route will be used to quantify leak

consequences. statistical probability, individual human/property risk. and total

human/property loss frequency for a multitude of variables.

The goal of this assessment is to provide a risk assessment tool not only for evaluating

Mariner East pipelines, but any and all existing or future NGL pipelines. In order to do this

efficiently, the Mariner East 2 pipeline route will be used as a baseline route to provide

flow characteristics for variable pipeline characteristics (i.e. flow materials, pipe

characteristics, diameter, pump station discharge pressure, pump station spacing, etc.).

Variables Shall Envelope Pipeline Operation Details

Any and all information that is typically provided by the pipeline operator (i.e. specific

NGL mixtures, discharge pressure, flow characteristics, etc.) shall be used as variables and

varied to envelope all plausible scenarios to encompass Mariner East project and any

other potential NGL project possibilities.

NGL flow shall be simulated appropriately to reflect phase change physical chemistry.

Flow simulations can be generic. However, local pressures, temperatures, and density for

the flowing product is requested as output at critical features (i.e. valves, pre/post-pumps,

end-of-line).

To envelope flow and leak characteristics, analysis is requested for:

a) Pipe diameter sensitivities:

i) 4in, 8in (ME1), 12in, 16in (ME2X), 20in (ME2}, 24in, 30in, 36in.

b) Pumping station sensitivities:

i) Pumps assumed to be located 85 miles apart.

ii) Intermediate pumping stations added at 43 mile spacing as permitted in

approved DEP applications.

Citizens' Risk Assessment Initiative QRA Scope of Work 2

iii) Variable pumping station discharge pressures: 1500psi (MAOP}, 1200psi,

1,000psi, 800psi

iv) Request recommendations based on safe local operating pressures for

different NGL mixtures, specifically pure ethane that has highest critical

pressure.

v) Determine local operating pressure lower threshold where risk significantly

increases due to volatility within normal operation

c) Flow material mixtures:

i) 100% Ethane

ii) 100% Propane

iii) 100% Butane

iv) Y-Grade NGL

v) Other common NGL mixtures

vi) Methane Natural Gas

Plausible Leak Scenarios

Plausible leak scenarios shall be simulated using industry approved software.

Independent of actual features along the Mariner East route, hazards shall be simulated

with a variety of risk factors. These risk factors include, but are not limited to terrain,

topography, geology, presence of buildings/trees, proximity to sewers/karst, proximity to

ignition sources, etc. Standard leak analysis shall be simulated. However, consideration of

critical leak hole size must be either discussed qualitatively or derived analytically

(preferred). There may be a

These variables shall envelope all plausible pipeline uses and characteristics, providing

sensitivity analysis that shows how risk varies with each different parameter.

d) Pinhole leak hole sizes (1/8", 1/4", 1/2" and 3/4" holes, rupture)

i) Determine if ALL leaks greater than the "CRITICAL LEAK HOLE SIZE" for

each pipe diameter and product (defined below) must be combined and

treated with full rupture consequences.

e) Phase change volatility at cryogenic temperature shall be calculated for each

assessed product to determine "CRITICAL LEAK HOLE SIZE":

Citizens' Risk Assessment Initiative QRAScopeofWork 3

1) Determine mixtures/pipe diameter/leak hole size combinations that

have adiabatic expansion gas temperatures below API SL Carbon

Steel embrittlement temperature

(a) Discuss whether it is plausible for small leaks of gas below API

SL Carbon Steel embrittlement temperature can propagate a

leak hole into full rupture

2) Determine mixtures/hole size combinations that have adiabatic

expansion gas temperatures below Viton embrittlement

temperature. (Viton is used at valve/pump/inspection access above

ground features for 0-Rings and Seals)

(a) Discuss Viton seal performance when subjected to released

gas below its embrittlement limit.

Failure Mode Considerations

f) Undocumented Digging in someone's yard/land/farm

g) Trenching failure/error during commercial/institutional/industrial construction

h) Corrosion (i.e., seam failure, air to ground interface failure, etc.)

i) Weld failure

j) Field Bend Failure

k) Valve Breaking

I) Valve gasket failure

m) Equipment port failure

n) Ground shifting (Karst, heavy rain, etc.)

o) Shutdown/deinventory issues during emergencies or sudden events elsewhere

on line

Other Relevant Pipeline Sensitivities

p) Use of outdated welding methods (ME1)

q) Variable age (new, 20 years, 80+ years old)

r) Large diameter seam-welded (ME2, ME2X)

s) Straight pipe vs. pipe with excessive field bends as it navigates around residences,

roads, etc.

t) Different Pipeline features

Citizens' Risk Assessment Initiative QRAScopeofWork 4

i) Valve Stations

ii) Pump Stations

iii) Variable Depth 3ft, 6ft, 12ft buried pipe, SOft HOD, 100ft. HOD

1) Consideration in the event that drilling fluid dries out and leaves

full/partial open-air annulus surrounding HOD-installed pipe

Probability

u) Assess leak rates for both industry average AND worst Hazardous Liquids

transmission pipeline operator to show sensitivity

v) Leak data sources:

i) Federal leak data (self-reported)

ii) Enforcement Actions (Unreported but verified)

iii) Other publicly available source with references required

w) Account for risk factors specific to densely populated areas (Rural vs. Suburban)

i) Delayed ignition likelihood in areas with many ignition sources

ii) 3rd party damage (accidental or malice) with pipeline located on private

property.

x) Factor in likelihood of HVL pipeline leaks compared to traditional Liquid pipelines

y) Account for multiple pipelines in shared ROW

z) Account for crossing other pipelines at specific locations

aa) Account for different materials (ethane) and thermal risks to pipeline (especially

for two-phase flow)

bb)Consideration of pipeline run through unstable terrain (i.e. karst) that can fail from

ground shifting/sinking.

cc) Consideration of HOD pipe that is in constant bending preload.

dd) Consideration of large diameter pipe that has be cold-formed in the field.

Risk Mitigation Discussion

ee) Comment on use of de inventory tanks at valve sites

i) Procedures to deinventory lines at each valve site

ii) Procedures to reverse flow to deinventory line(s) to place material at safe

locations

Citizens' Risk Assessment Initiative QRA Scope of Work 5

iii) Procedures to allow/manage portable/temporary combustion units at valve

sites to deinventory line(s)

iv) Permits that may be required in advance to allow for reasonably anticipated

shutdown procedures?

ff) Comment on use of Automatic Valves

i) Explore difference between best-case Automatic Shutdown and Delayed

Shutdown

ii) Estimate of minimum time to invoke Emergency Shut-Down (ESD)

iii) Estimate of minimum pressure loss to invoke ESD

iv) Estimate of expected material loss before control room identifies minimum

pressure loss to invoke ESD

First Response Comments and Discussion Requested

gg) Safe-Distance setbacks for First Responders in different plausible leak scenarios:

Prior to Ignition, During Post-Ignition Jet Fire, etc.

i) Note time durations for each scenario (i.e. how long until 5 mile isolated

segment de inventories via jet fire)

hh) Amount of space required to accommodate first responders and support

equipment in event of valve site failure

ii) Amount of space required to accommodate first responders and support

equipment in event of line failure

jj) Valve site detectors to evaluate early warnings of potential leaks, networking of

these detectors to first responders, and community warning

kk) Community notification in densely populated residential and institutional settings?

II) Utility protection in emergencies?

mm) First responder access protocols, incident command hierarchy?

nn) How to perform a pig dig in HOD segments >>20' below grade?

oo)What anomalies are smart pigs missing and how to manage pipes the operator

cannot visually inspect?

pp) Leak Response Infrastructure:

i) Water supply requirements and protection in emergencies

ii) What infrastructure required to extinguish jet fire?

Citizens' Risk Assessment Initiative QRAScopeofWork 6

iii) What infrastructure required to promote gas concentration dissipation

below combustion levels?

iv) Effectiveness of on-site gas leak detectors at valve/pump stations

v) Can above ground features be enclosed in ballistics bunker?

Acceptance of the work is contingent on the following acceptance criteria:

1. Final report providing results with all inputs and assumptions stated clearly, as well

as references. The report must include the following:

a. Summary of results with discussion of their meaning and description of how

the data can be used with stated limitations.

b. Hazards zones (i.e. blast radius) identified around pipeline route and

features.

c. Individual Risk to humans and property quantified around pipeline route

and features provided for the different variables identified herein.

d. Risk of Total Human (lives) and Property Loss (USD) based on public data

from census and tax records or other referenced public sources.

e. Individual and Total Loss Risk shall be provided in a way that allows

interactive calculation of risk that can be applied to NGL or Natural Gas

pipelines in the event of risk factor changes

i. Ability to update risk based on presence of different risk factors

ii. Ability to transpose risk onto a different route that has same

variables and risk factor combinations

RFP & Project Timelines

The Request for Proposal timeline is as follows:

[ Request for Propo~al Issuance

I

Start of Negotiation

Contract Award I Upon agreement with committee

12/12/2018

I \ 212412018

13/5/2018

The need-date for project completion is 4-6 weeks from time of bid acceptance. Bidders

may propose a date earlier or later, and will be evaluated accordingly.

Citizens' Risk Assessment Initiative QRA Scope of Work 7

Budget

The Citizens' Risk Assessment Initiative budget for the project will be determined based

on scope of work performed, private fundraising efforts, and municipal partner

contributions. Estimates will be directly impacted by the amount of viable options made

available to the Risk Assessment. Initially the estimate for completion is $50,000 (USD).

Costs will be itemized out after preliminary consultation with the chosen vendor. The

Citizens' Risk Assessment Initiative will determine the best way to proceed with available

funds raised. Scope of work will be a Time & Materials approach. Updates are to be

provided from vendor via email or status report on a bi-weekly basis. Invoices are

expected every month. The Time & Materials approach will be restricted by a Not to

Exceed dollar value based on available funds.

Citizens' Risk Assessment Initiative QRA Scope of Work 8

© oQo~®llil@~

~o@lli ~ &@@®@@Uilil®llilQ

ORA Vendor Search

& Selection Parameters

Vetting outline for selection of a quality company to

assess levels of risk for pipeline development

Citizens' Risk Assessment Initiative

January 2018

ISSUED BY

Citizens' Risk Assessment Committee

Contact: riskassessmentcommittee@gmail.com

REPRESENTATIVE

Seth Kovnat, Project Engineer Tom Casey, Risk Assessment Chair

Summary

The Citizens' Risk Assessment Initiative engaged in a comprehensive search to find qualified firms that have the right combination of capability, credentials, integrity, and interest required to properly assess risk from Natural Gas Liquids pipelines across the Commonwealth of Pennsylvania.

There are a multitude of risk factors associated with the operation of artificially liquefied

Ethane, Propane, and Butane pipelines in densely populated areas. The importance of finding a qualified company to assess the risks was paramount for the Citizens Risk Assessment Team.

The primary objective of this risk assessment is to quantify risk along the Mariner East pipeline route for any and all reasonable operational and environmental variations. The assessment results will provide any member of the public the ability to determine their own personal life/property risk while also providing government and emergency services the ability to determine the potential risk magnitude to populations and property.

Performing the assessment using a multivariate approach will efficiently provide a very powerful results package for a number of reasons:

1) Sensitivity analysis of different operational data ensures that the assessmentwill cover any and all operational variations throughout the life of the pipeline. This includes material mixtures, pipe diameters, pump station spacing, pump discharge pressure, etc. This analysis can be expanded to include Methane Natural Gas and other materials being shipped via transmission pipelines in our area. 2) Sensitivity analysis of different environmental risk factors will allow the results to be used to determine risk in the event risk factors change along the current route. More importantly, this sensitivity allows the results of this risk assessment to be applied to ANY existing or potential new Right of Ways given they have the risk factors covered in this analysis. The ability to determine risk for any existing or future planned NGL pipeline infrastructure is a very power tool that can ensure future planning is data driven. 3) Sensitivity analysis will objectively show how potential installation issues (as documented from DEP Notices of Violations) affect risk. 4) Sensitivity analysis will objectively show how potential mitigation attempts affect risk.

Citizens' Risk Assessment Initiative QRA Vendor Selection 1

Under normal circumstances, land-use is regulated at the local level by municipalities many of whom have a comprehensive safety ordinances for zoning. For this pipeline application, most municipalities that have such ordinances have been hesitant to apply them given the project's eminent domain authority that has been applied to Mariner East

by the PA PUC. The few municipalities that have tried to enforce their safety-related pipeline zoning ordinances, have not been armed with quantifiable risk data to support safety related municipal concerns. Instead, municipalities have relied on high level federal government regulations, echoed at the state level, that fail to address local risks to communities.

Having quantifiable risk data empowers communities, local municipalities, emergency personnel, schools, and private citizens alike. With quantifiable data:

1) Private citizens can decide how much risk they can tolerate. 2) Municipalities can see where risks are heightened and decide what measures can be taken to mitigate risks. 3) Emergency personnel can see what magnitude of emergency is possible and decide what infrastructure they require to proactively minimize carnage while planning

realistic evacuation procedures and routes. 4) All of us can use this data to make reasonable requests to the pipeline operator or higher levels of government in the name of risk mitigation.

Overall, we can qualitatively state that the consequences of a Mariner East pipeline leak have the potential to be catastrophic. Many perceive that the probability of a catastrophic leak is low. We must move past qualitative statements and obtain real quantitative data. Data is a very effective tool to mitigate risks, protect property interests, and give landowners the ability to assess levels of risk and how they may impact their health, safety, and welfare. For these reasons it was crucial for our search parameters to find a qualified risk assessment firm that can provide all of the necessary answers in a way that maintains the highest level of integrity.

Search Parameters

The first level of search parameters focused on what is most important to engaging with a

qualified risk assessment firm.

Required:

Citizens' Risk Assessment Initiative QRA Vendor Selection 2

1) Vendor must regularly work in oil and gas industry. 2) Vendor must use simulation to determine flow characteristics and leak consequences. 3) Vendor must use well-respected risk assessment process. 4) Vendor must have high standards for integrity and unbiased quantifiable risk assessment.

5) Vendor must have history of working with industry, government, and emergency services. 6) Vendor must be held in high regard with PHMSA and DOT.

7) Vendor must recognize and be capable of efficiently assessing any and all potential risk factors that can affect an NGL pipeline in a densely populated area. 8) Vendor must be capable of simulating phase change and two phase flow associated with HVLs.

9) Vendor must have streamlined process for assessing multiple variables that fully envelope all potential risk factors and operational scenarios. 10)Vendor must have strong interest in generating new risk data in an area lacking data driven regulation.

The second level of search parameters were critical for any firm that would be chosen. These parameters would help to ensure the quality of the work being produced. Also, they would allow for limited dispute of findings.

Preferred:

1) Vendor should be considered a preferred vendor with PHMSA or other regulating agencies. 2) Vendor should have no current relationship with Sunoco Logistics, Energy Transfer Partners, or any subsidiaries of these companies. 3) Vendor should be an industry leader in risk assessment and consequence modeling. 4) Vendor should have history of educating the industry and/or government and/or emergency services.

5) Vendor should have option to teach public or other entities.

Selected QRA Vendor Qualifications

1. Vendor has advised and provided for US Department of Transportation (DOT)-sponsored study of pipeline risk management.

Citizens' Risk Assessment Initiative QRA Vendor Selection 3

2. Provided training for DOT federal and state pipeline pipeline risk management auditors.

3. Consulting projects for numerous pipeline operators in the U.S. and in over ten foreign countries. 4. Provided expert witness testimony and report preparations for court proceedings involving previous work.

5. Has helped numerous local and federal government agencies regarding possible impacts arising from pipeline projects.

The company was has been in operation for over 25 years, with experts that have a combined 65 years experience in operations, construction, design, and maintenance. The founder is a noted lecturer, software designer, and author. They have a wide range of clients from a variety of sectors including academia, legal firms, engineering companies, insurers, and industry professionals. They specialize in risk assessments and integrity management plans for pipeline development with an emphasis on providing educational workshops that give their clients the power to use the results in the way that best suits the customer needs.

The company's engineering experts have helped to provide consulting services such as:

1. Compliance Assessments - based on current government regulations and industry practices; 2. Risk Management - based on risk reduction versus resource allocation analysis methods; cost/benefit analyses;

3. Risk Assessments - based on new and improved quantitative methods and proven consequence analysis methods; 4. Custom Software Development - risk assessment and management, database management and engineering application program development.

5. Risk Management Workshops - risk management presentations and workshops;

6. Ownership Transfer Due Diligence - compliance and risk assessment approaches;

7. Procedure Development - operations, maintenance, emergency & management procedures;

8. Personnel Training - on site refresher & custom training programs;

The company operates under some guiding principles. First, the are committed to technical excellence. They will continue to develop and efficiently apply the optimal risk management tools in order to best meet the needs of their clients. They strive to consistently provided the most cost effective solutions for their clients. They vow to never advise a client to spend resources in an inefficient manner. Reliability in services provided

Citizens' Risk Assessment Initiative QRA Vendor Selection 4

helps meet or exceed established client expectations; the result is a long-term client relationship and a reputation for delivering sound solutions under high public and government scrutiny. And finally, they prides themself in providing objective and unbiased information to clients ensuring an unquestionable level of integrity and professionalism.

Conclusion

The Citizens' Risk Assessment utilized input from years worth of input from the countless

public meetings being held across the state. The need for a quality report grows with each

new pipeline project being considered in the state of Pennsylvania. The rush to get these

projects completed without knowing the true impacts would be a mistake. The industry

only tells communities what they want them to know. The community has determined

that it wants to know more, to have true understanding of the risks involved.

Citizens' Risk Assessment Initiative QRA Vendor Selection 5

XXXXXXX TOWNSHIP

XXXXX COUNTY, PENNSYLVANIA

RESOLUTION NO. XX-2018

A RESOLUTION of the Board of Supervisors of XXXXXXXX Township, XXXXX County, Pennsylvania recognizes the real threat to health, welfare and safety of township resident e to the development of hazardous liquids transmission pi areas defined by the Pipeline and Hazardous Administration (PHMSA) as a "high consequence are

WHEREAS, XXXXXXX Township is classified by P area", meaning the result of a pipeline incident have catastrophic impacts to life, property a

WHEREAS, more than one hazardou, · - ethane, butane and propane that ar extreme pressure are currently transm1 impact radius of residential, I and

rless, heavier than air and under

to transmit through the probable e within XXXXXX Township; and

de states that the Governor shall consider taken to prevent or reduce the harmful

associat like Che

nd the PUC have failed to conduct a risk assessment f highly volatile NGLs through high consequence areas

WHEREAS, 01 f the Commonwealth of Pennsylvania and XXXXXXX Township have a right to understand the risks that they face in their homes, schools and communities;

NOW THEREFORE, BE IT ENACTED AND RESOLVED by the Board of Supervisors of XXXXXX Township, XXXXXX County, Pennsylvania that the Board expresses its deep concern about the absence of this information for community outreach and the proper and thorough planning for disaster prevention and emergency response to an NGL pipeline failure within the Township; the Board adopts the following:

1

1. In response to the absence of a quantitative assessment of the risk related to currently in service and under construction pipeline infrastructure projects within XXXXXX Township, the XXXXXX Township Board of Supervisors support the Citizens-led Risk Assessment.

2. Contributing financial support in the amount of $15,000 to the funding of an independent study conducted by an independent and reputabl by the Citizens-led Risk Assessment Committee according outlined in exhibit A

3. Agree to conduct any further assessment or evaluation b commissioned by XXXXXX Township through Committee for a period of one year from the r report.

4. And to support the Citizens' Risk A

RESOLVED this day of March, Township, XXXXXX County, PA at the

2

oard of Supervisors of XXXXXX

of said Board.

BOARD OF SUPERVISORS

XXXXXX TOWNSHIP XXXXXXX COUNTY, PENNSYLVANIA

, Chairman

, Vice Chairman

, Supervisor

Memo East Goshen Township

Date: March 8, 2018

Board of Supervisors To: From: Rick Smith, Township Manager

Natural Lands Pond Study Re:

Background - As requested, Mike, David, and I met on March 5, 2018, to develop a plan of action for implementation of the Natural Lands Pond Study. Mark Miller attended the meeting as well.

While the Study encompasses six ponds, it recommends that dredging can be deferred until 2022 for the Pin Oaks Pond and Bow Tree II & III Pond. We therefore directed our attention to the Marydell Pond, Hershey Mill Pond, Bow Tree I Pond, and the Bow Tree II & III Basin.

It was the consensus of the group that we would use the following criteria for ranking the ponds:

• Water Quality- We compared the water quality to the Penn State standards.

• Complexity - We agreed it would be better to start with the ponds that allow for the disposal of the dredged material on site.

• Visibility - We agreed that a pond that was readily visible would maximize the number of people that would be able to view the finished project.

• Self-perform - If the Public Works Department could do the work, it would significantly reduce our out-of-pocket costs.

• Other-Are there some other factors that impact the pond?

Conclusions - Water quality is a major issue. While we performed water tests in October 2017, we would recommend that all of the ponds be tested every April and October. This testing will provide us a baseline for each pond, which will enable us to determine the effectiveness of the improvements.

The Public Works Department should do the work to in order to reduce the Township's out-of- pocket costs.

Do one pond a year, which would allow Public Works to fit it into their schedule and minimize the impact on the budget.

We should engage a consultant to work with the Conservancy Board and a residents' pond committee to develop the construction and landscaping plans for each pond.

We would need to develop a specific plan for each pond that would be communicated to the residents. We want to clearly define what the residents can expect to happen and when. We would utilize the Township Engineer for any required permitting or structural improvements.

We recommend that the Marydell Pond be done first. It has the second-worst water quality of all of the ponds. Dredging it would be simple since we can dispose of the dredged material on site and the pond is visible from Barker Drive, which would allow other residents to see the finished product. Public Works can do the work, and most importantly, the outlet structure needs to be replaced.

We would recommend that this group get together again early next year in order to determine what pond should be done next since by that time, the condition of the other three ponds and their components may have changed. In addition, we will have completed additional rounds of water testing.

Suggested Motion - I move that we proceed with the dredging and replanting of the Marydell Pond as outlined above.

In addition, the Board hereby appoints the following residents to the Marydell Pond Committee.

(insert names)

This committee is tasked with working with the Conservancy Board with respect to various improvements to be made at the Marydell Pond.

Finally, we should test the water in all of the ponds in April and October.

F:\Data\Shared Data\Public Works Dept\Pond Treatment\2018\Memo to BoS 030818.doc

Memo

To:

From: Re: Date:

Board of Supervisors Department of Parks and Recreation Paoli Pike Trail, Segment B; Penn DOT & DCED-CFA Multimodal Transportation Fund Grant Applications March 12, 2018

The East Goshen Township Paoli Pike Trail Feasibility Study and Master Plan has identified a number of

funding sources for its implementation. Both the Penn DOT and DCED-Commonwealth Financing

Authority Multimodal Transportation Fund grant programs have been identified as potential funding

sources for trail segment B. Paoli Pike Trail Segment B anticipated project costs are $2,712,000, see

attached Cost Estimate for detail. Of the Township match, the preliminary engineering, environmental

clearance and final design have already been approved and under way via McMahon Associates.

Township staff recommends applying for each grant program. The amount requested through the

Penn DOT Multimodal Transportation Fund amount is $1,866,000 with an East Goshen Township's

matching fund expenditure of $838,500. The amount requested through the DCED-CFA Multimodal

Transportation Fund amount is also $1,866,000, with an East Goshen Township's matching fund

expenditure of $838,500. It is also important to note, that two other grant programs (DCNR-C2P2;

$500,000 application} and Chester County Municipal Grant ($150,000 application} would follow in the

subsequent grant round following funding through the above two programs.

Motion: I move to authorize application for both the PennDOT and DCED-CFA Multimodal

Transportation Fund grant programs in the amount of $1,866,000 and approve matching funds in the

amount of $838,500.

Exhibit 1 - Engineer's Conceptual Opinion of Cost Project: Paoli Pike Trail - Segment B (Ellis Lane to Reservoir Road) Applicant: East Goshen Township

Total MTF Request Administrative Contingency $ 87,000 $ - Preliminary Engineering $ 228,000 $ - Environmental Clearance $ 25,000 $ - Final Design $ 169,000 $ - Right-of-Way $ 322,000 $ - Utilities $ 15,000 $ - Construction $ 1,721,000 $ 1,721,000 Inspection $ 145,000 $ 145,000 Total $ 2,712,000 $ 1,866,000

Matching Funds

$ 87,000 $ 228,000 $ 25,000 $ 169,000 $ 322,000 $ 7,500 $ - $ - $ 838,500

Percent of Match 45%

Notes and Assumptions: Construction estimates are based on quantities derived from the trail conceptual plan included in the Paoli Pike Trail - Feasibility Study and Master Plan and unit prices from recently bid local projects with PennDOT oversight.

The following costs are rough estimates for budgeting purposes only: Utility Relocations and Right of Way. The costs associated with these items will need to be determined through the development of the project.

Estimates of existing and required right-of-way were developed based on GIS data obtained from Chester County. Existing legal right-of-way lines and property lines have not been independently verified through field survey or deed research. Existing legal rights-of-way and existing property lines, as well as the size and location of any required rights-of-way (temporary or permanent), will need to be determined during the preliminary engineering of the project.

Right-of-way estimates include rough approximations for temporary and permanent easements, but do not include the cost of legal fees associated with right-of-way acquisition process.

The Engineer's Conceptual Opinion of Cost does not include relocating or resetting existing underground utilities within the limits of the project or the provision of any future utilities. Impacts to existing underground utilities will need to be determined during the preliminary engineering of the project through subsurface utility engineering. Due to visible evidence of subsurface utilities within the project area (underground electric, water, sewer, gas and telecommunication) it is recommended (and likely required by law) that utility test pits be performed during the preliminary engineering of the project.

Further evaluation of the existing signalized intersections within the project limits is required during the preliminary engineering of the project. This evaluation may result in the identification of other improvements and costs not identified within this Engineer's Conceptual Opinion of Cost.

The estimate includes a contingency of 5% of infrastructure cost.

The Engineer's Conceptual Opinion of Cost does not include any environmental remediation (including but not limited to removal and replacement of contaminated soils) or environmental impact mitigation. Post-construction stormwater management is included in the estimate for each segment. However, these estimates do not consider credits or deductions from other Township capital nrniAr.ts

Disclaimer: This opinion of cost was prepared at the request of East Goshen Township for the purpose of the Multimodal Transportation Fund (MTF) grant application. This opinion of cost is based on the Paoli Pike Trail - Feasibility Study and Master Plan. Please note that opinions of cost are subject to change based on plan/design revisions, fluctuations in unit costs, field conditions, and differences in locale. Opinions of cost are provided for use in budgeting, but in no way intended to be construed as a final cost for the project. Final costs are contingent only on actual bids from contractors.

Engineer's Conceptual Opinion of Cost for Paoli Pike Trail Conceptual Design Exhibit East Goshen Township, Chester County, PA

nem

No. Description

Standard Items

1 Clearing and Grubbing

2 Class 1 Excavation

3 Foreign Borrow

4 Saw cut existing pavement

5 Grading (includes topsoil and seeding)

6 Full Depth Bituminous Pavement +Wearing Course (8" Bituminous Base Course & 8" Subbase)

7 Driveway Adjustments

8 Plain Cement Concrete Curb

9 Drainage Upgrades

10 Construction Surveying, Schedule, Equipment Package

11 24" While Pavement Markings, Hot Thermoplastic Paint

12 Signage

13 ADA Accessible Curb Ramp at signalized intersection

14 Detectable Warning Surface

15 Traffic Signal Upgrades

16 Tree Replacement

17 Special Items

18 Porous Bituminous Pavement Trail

19 Post Construction Stormwater Management

20 Plastic Ribbon Fence

21 Split Rall Fence

22 Wooden Boardwalk

23 Miscellaneous Relocations

23 Subtotal Trail Construction Cost

24 Maintenance and Protection of Traffic

25 Erosion and Sediment Control

26 Mobilization

27 Contingency

28 Total Trall Construct/on Cost

29 Construction Inspection

30 Total Trail Construction +Inspection

31 Preliminary Engineering

32 Environmental Clearance

33 Final Design

34 Utilities

35 Right-of-Way

36 Total Trall Project Cost

Assumptions & Notes:

Segment B: Ellis Lane to Reservoir Road

Comment

see below

New Drainage Structures/Pipe

at a signalized intersection

at a driveway

Push Button upgrades

Approx. 5% ofTotal

Segmental Stone Wall

Items 1 - 23

Approx. 10% of Item 23

Approx. 5% of Hem 23

5%ofltem23

5% of Items 23 - 26

Items 23 -27

8%ofllem28

Items 28 -29

Items 30 -35

-Wooden Boardwalk unit cost based on material research provided by East Goshen Township.

-Ground restoration (grading) for 8' on front of trail and 2' on back of trail.

3/12/2018

Unit Quantity Unit Cost Cost

LS 1 $130,000.00 $130,000.00

CY 2,450 $80.00 $196,000.00

CY 245 $65.00 $15,925.00

LF 434 $10.00 $4,340.00

SY 2,964 $20.00 $59,280.00

SY 50 $115.00 $5,750.00

SY 150 $75.00 $11,250.00

LF 138 $40.00 $5,520.00

LS 1 $37,500.00 $37,500.00

LS 1 $20,000.00 $20,000.00

LF 580 $10.00 $5,800.00

EA 10 $190.00 $1,900.00

EA 3 $8,100.00 $24,300.00

EA 4 $3,100.00 $12,400.00

LS 1 $25,000.00 $25,000.00

EA 25 $1,100.00 $27,500.00

SY 2,904 $100.00 $290,400.00

LS 1 $71,000.00 $71,000.00

LF 575 $30.00 $17,250.00

LF 1,900 $25.00 $47,500.00

SF 5,157 $70.00 $360,990.00

LS 1 $62,500.00 $62,500.00

$1,433,000.00

$144,000.00

$72,000.00

$72,000.00

$87,000.00

$1,808,000.00

$145,000.00

$1,953,000.00

$228,000.00

$25,000.00

$169,000.00

LS 1 $15,000.00 $15,000.00

LS 1 $322,000.00 $322,000.00

$2,712,000.00

ELUS lANlE lO RESERVOIR ~OAD

Focused on the preferred trail aligiiment on tire north side of Paoli Pike

Existing land uses include the Out of Reach horse farm, residential property with agricultural uses, Goshen Corporate Park, and residential properties on the southside

Paoli Pike is one lane in each direction, with left-tum lanes provided at the signalized intersections with Ellis Lane and Reservoir Road

Steep slopes adjacent to the roadway between Ellis Lane and

the East Branch of Chester Creek and the Goshen Corporate Park frontage

Crossing of the East Branch of Chester Creek and the associated wetland/flood plain area

Overhead utility lines on the north side between Airport Road and the East Branch of Chester Creek, where the lines transition and continue on the south side

Vegetation adjacent to the roadway between the East Branch of Chester Creek and the Goshen Corporate Park

Limited bicycle and pedestrian facilities include pedestrian path for Price Fields on the south side of Paoli Pike and crosswalks and pedestrian signals at the signalized

Double split rail fence for the Out of Reach Farm pasl:Lire to provide a safe distance between trail users and horses

Trail alignment generally at the top of steep slopes adjacent to the roadway to provide an adequate buffer area and minimize the need for re-grading or

structures

Pedestrian safety rail (ribbon fence) between the roadway and trail at select locations with steep slopes to provide trail users with a sense of security

High visibility crosswalks at one commercial and one residential driveway

Approximately 425-footnew elevated boardwalk trail bridge to cross the East Branch of the 01ester Creek and associated wetland/floodplain area

Remove existing field stone wall and vegetation along the roadway between the East Branch of Chester Creek and Goshen Corporate Park. Replace with

new separator or screening between the trail and residential property.

Utilization of the existing shoulder area immediately west of the Reservoir Road intersection for a portion of the trail and buffer area

Upgrades at the Reservoir Road signalized intersection to provide four high visibility crosswalks with ADA compliant curb ranlps and bicycle detection

24 Feosibilil)1 Sfuc/y and Master Plan

D

D

SR 2fJ14

LEGEND

PROPOSED MULTI-USE TRNL (10' WIDTH)

PROPOSED TRAIL BOARDWALK

PROPOSED NEW GRASS BUFFER AREA

PAO LI IKE TRAIL

PROPOSED CURB

PROPOSED EOCE OF PAVEMENT

PROPOSED PAVEMENT MARKINGS

PROPOSED SAFETY RAIL (fENCE)

PROPOSED SICN

REOUIREO SIDEWALK EASEMENT ·"

EXJSTINC CURB

EXISTINC EOCE: OF PAVEMENT

EXISTINC PA~ENT !AARK!NCS

EXISTING CONTOUR (2 F'OOT INTERVAL)

EXISTING RIGHT-OF-WAY LINE

EXISTING PROPERTY LINE

EXISTING UTILITY POLE

25

[ij TRAIL USER STOP SIGN B PUSH BUTION SIGN

r;QIE:_ REFER TO PAOLI PIKE TRAIL - FEASIBILITY STUO'r' AND MASTER PLAN FOR ALL ASSUMPTIONS, EXCLUSIONS, AND OES1GN CRITERIA USED IN THE PREPARATION OF THIS CONCEPTUAL OESlGN Pl.AN.

,.

O' 50' 100'

Feasibility Study and Moster Pion

Memo

To:

From: Re: Date:

Board of Supervisors Park and Recreation Commission Community Day Activities March 12th, 2018

Community Day has been scheduled for Saturday, June 30th with a rain date of Sunday, July 1st. Per Township procurement standards; the Director of Parks and Recreation has received the following price quotes with accompanying recommendations. Quotes were for the exact type, quality and quantity of service. It is important to note, the Friends of East Goshen 501c3 anticipates financially supporting the event in its entirety.

Name Service Provided Service Fee International Fireworks Fireworks Demonstration $9000 D & M Fireworks Fireworks Demonstration $9000 Sky Shooter Displays Fireworks Demonstration $9000

Name Service Provided Service Fee One Stop Party Shop Inflatables and Carnival Games $4830.00 (sent email 2/13 offering additional 15% off, to $4105.70) Bette's Bounces Inflatables and Carnival Gaines $3913.60

After reviewing the above price quotes, the Park Commission recommends selecting D & M Fireworks and Bette's Bounces for Community Day.

D & M Fireworks is the fireworks recommendation because:

• Provided last year's Bicentennial Celebration fireworks, which was universally applauded as the best in years. • D & M is by far the most responsive vendor the Township has worked with and is personally invested in providing a high quality show. • D & M's Owner personally comes to the event, supporting efforts if needed.

Bette's Bounces is the inflatables recommendation because:

• Price quote is the lowest • Customer service (determined at events) has been the best amongst the above vendors. • Bette's Bounces also provides staff for the trackless train and gas; additional Township cost savings

Motion: I motion to select D & M Fireworks and Bette's Bounces for the above listed Community Day services.

Computer/H:/East Goshen Township/Budget

PO POX 503 BALLY, PA. 19503

Fireworks Proposal East Goshen Township

Prepared for Jason Lang

Event Date June 30, 2018

February 10, 2018

Dear Mr. Lang,

P: 610·656-1575 F: 888·797·4675

Below we have listed our fireworks proposal for June 30, 2018. D&M Fireworks has always put our focus on providing customers with fantastic service throughout their entire experience with us, offering competitive pricing, and employing the highest safety measures on all our products. Our goal is to establish positive relationships with our customers that will grow into long-lasting partnerships.

The proposal listed is built using a budget of $9 ,000. You will find a great variety that will astound your audiences and make this a show they won't forget. Our fee also includes display design, insurance, transportation, all required materials, labor, setup and break down upon completion of the show. Please be sure to remember, that as sponsors, you are responsible for obtaining all necessary permits, security, and safety supp01t from your local fire depaitment for the day of your event.

If any questions or concerns come up, please feel free to reach out to us. We will be more than happy to assist you.

PO Box 503 • Bally, PA 19503 •Phone: 610.656.1575 •Fax: 888.797.4675 •Email: dave@dmfireworks.com • www.dmfireworks.com

I

I !

I !

I I I i

~ I

Opening

30 6 5 3 100 300

Body of Display

120 144 72 54 27

Mid-Level Display

49 150 280 104 100 49 100 100 210 100

,,:~_fff»/ ~~ •• ~ a_ FIREWORKS

PO BOX 503 DALLY, PA. 19503

Po 610·656·1575 F: 888·797·4676

East Goshen Township

2.5 Inch Shells Rainbow Peony with Titanium Salutes 4 Inch Asso1ted Display Shells 5 Inch Assorted Display Shells 6 Inch Assorted Display Shells Variety of Colorful Repo1ts Red White & Blue Salutes

2.5 Inch Assorted Display Shells 3 Inch Assorted Display & Fancy Exhibition Shells 4 Inch Assorted Display & Fancy Exhibition Shells 5 Inch Assorted Display Shells 6 Inch Assorted Display Shells

Fan Shaped Big Willow with Green Strobe

Silver Whirls to Report 3 Time Whistles to Red Flowers and Titanium Salutes Silver Soinning Poison Soiders Sea Blue, Orange, Grass Green Peony with Salutes Fan Shaped Red Time Rain

lOxlO Rain Storm with Whirling Pin Wheels - Z Blue Tails to Blue Brocade Crown

X Gold Crackling Split Coconut Trees Double Z Sea Blue to Gold Chrvsanthemum

PO Box 503 •Bally, PA 19503 •Phone: 610.656.1575 •Fax: 888.797.4675 •Email: dave@drnfireworks.com • www.drnllreworks.com

Grand Finale

210 120 24 15 6 600 100

PO BOX 503 BALLY, PA. 19503

P: 610-656-1575 F: BBB-197-4676

2.5 Inch Shells Rainbow Peony with Titanium Salutes 3 Inch Multi Effect Shells and Titanium Salutes 4 Inch Multi Effects Shells 5 Inch Multi Effects Shells 6 Inch Multi Effects Shells V Brocade Crown with Salute Quick Whistle Birds with Red Crackling Flowers

Included in the above package are salutes, mines, peonies, chrysanthemums, tiger tails, crossettes, coconuts, scatters, dahlias, crowns, willows, and comets. We have also included a vast assortment of dynamic floral and pattern effects that amaze all ages. D&M Fireworks believes there is no substitute for quality in fireworks. With this in mind, we use only the best products available to our customers. Not only will your audience marvel at the difference in the value of the fireworks display, but it also will ensure that safety remains a priority. We are confident that your experience with us will make your decision for fireworks in the future an easy one.

Thank you for your consideration.

Best Regards,

Davi2::ip:.~ '6~ ~~

D&M Fireworks, LLC Phone:610-656-1575 Fax: 888-797-4675 Email: dave@dmfireworks.com Website: www.dmfireworks.com

po Box 503 •Bally, PA 19503 •Phone: 610.656.1575 •Fax: 888.797-4675 •Email: dave@dmfireworks.com • www.dmfireworks.com

Logo with an illustration of a rocket with a starburst: SKYSHOOTER Displays, “The Pyro Professionals”, 570-328-1361, Wapwallopen, PA, www.zypyrotechnics.com

FIREWORK DISPLAY
PROPOSAL

East Goshen Twp

2018

$9,000

Firework Display Details

OPENING FINA_LE

2.5" & 3" Red, White, Blue Clnys 60

4" Brocade Crown & Salute 12

5" Brocade crown 5

6" Assorted Clnys 3

Custom Green Time Rain Cmtain (2 units) 200

Total 0Rening Finale 280

BODY OF PROGRAM

3" Assorted Shells (Shot in pairs of 2 or 3) 120

3" Asso1ted Shells (Shot As Singles) 144

4" Ass01ted Shells (Shot In Pairs of 2 or 3) 72

4" Assorted Shells ( Shot as Singles ) 60

5" Asso1ted Shells (Shot as Singles & doubles) 72

6" Ass01ted Shells 45

Total Shells Body 513

2

CURTAINS DURING BODY OF SHOW

ZV is lmown for our custom created "Super Curtains". Our "Super Curtains" are multiple cakes (units) shot at multiple positions. This takes our displays a step above the competition presenting an extra breathtaking

element to your firework display.

Fan dou lia mi 100

Red Comets to Horse tails 100

Crossett Fan Wall All Red-White-&-Blue (2 Units) 98

2.5" Brocade Crown 72

2.5" Custom Sky Color Creation R-W-B-G-Y Peony 72

Purple to big Craclding Rain 100

Our Falling Leaves Scenery 50

V Shape Golden Rain Curtain 100

2.5" Assorted Rings 72

Ass01ted chrys 100

2" Crackling palms 50 Total Shots in Curtains in Body 914

3

GRAND FINALE SHELLS

Quick Salute 200

Quick Whistle R/W/B to Salute 300

Custom American Thunder 200

2.5" & 3" Red, White, Blue Strobing Chrys 160

2.5" & 3" Salutes 60

2.5" & 3" Custom Red-Yellow-Purple-Blue-Green color iuns 120

4" Brocade Crown 30

5" Brocade Crown & Multi Salute 20

6" Multi Salute 12

Total Shots in Grand Finale 1102

Total Shots in Show

Opening 280

Body Shells 513

Body Curtains 914

Finale 1102 Total Shots in Show 2809

4

Show Proposal

A Custom Proposal Designed by International Fireworks Manufacturing Company

For:

!Applebrook Golf C:lt,ib ..

Dates:

~_r99_r9i:ri Q_a_t~: ... l{)/3Q/:z91.?

Show Proposal Details

Summary:·

Rain Date: 1·········· ····-··-- ----· .. 17/V'l:-.018 .

frhi~ -c;~~t~m 6~~\gn~d Show for E~st- Goshen c~mmunity o~y 1; s~mm~~i~ect to I :have. appro)(lrnately s.~.37. T()tal ?~ots.. . . .. . .. -···- _ . .!

Prowam co,st: !$9,000

Opening Display 1 049 Total Shots: '

3 Inch Shells

4 lnch Shells

5 Inch Shells

6 Inch Shells

Cakes

Shell Type Quantity of Shots

Flights of Assorted Shells (5 Shells)

Total Number of 3 Inch Shots fi~----·.· .. ···-----1

Shell Type Quantity of Shots

Flights of Assorted Shells (5 Shells)

Total Number of 4 Inch Shots l_lO ·.,

Shell Type Quantity of Shots

Flights of Assorted Shells (5 Shells)

Total Number of 5 Inch Shots! ii · · · ·i l- l

Shell Type Quantity of Shots

Flights of Assorted Shells( 4 Shells) l4 L .....

Shell Type

11000 Shot Whistling Dragon

Total Number of 6 Inch Shots 14 · ···

\.,..,

Quantity of Shots

Total Number of Cake Shots I ~.0.()~ . · .,

You can expect the following types of effects in the opening portion of the show

!

······1

. ---· .1

I

• Five Shells Fired Simultaneously ... Minl Barrages of Special Effects Such As Rings, Patterns, Brocades, Palm Trees, Assorted Colors & Salutes with Rising Tails. • Four Shells Fired Slmultaneously ... Mlni Barrages of Special Effects Such As Twinkling Kamuro with Long-Hanging Curtain effect, 3 Color-Changing Peony with Double Pistil & Tail, Large Trailing Tiger Tail to Peony • The "Angry Birds" Year Of The Dragon Equivalent, Rapid Fire Total Saturation Of Sparks, Flame, Noise And Smoke! • Extreme-Rapid-Fire Assault With Color In The Near-Air

!It is with utm~st pl~~~~1re th~tvre a.re.th~~kiui·t~ p~~~d~ ym~ ~th the.. . j jnewest designs in fireworks displays. Out· creativity in selection of the !finest products is sure to keep the "oohs" and "aahs" escaping the

\mouths of your crowd!!! . .

Main Body Display· 3 131 Total Shots: '

3 Inch Shells

4 Inch Shells

5 Inch Shells

6 Inch Shells

Shell Type Quantity of Shots

Superb Unique Multi-Effect Shellsl

Superb Unique Multi-Effect Shells2

Fancy Assorted Colors & Effects w/ Tails

[~-~~~-.: .. - --- -· . Extra Fancy Effect Shells

Assorted Canister w/Color & Special Effects !§.: ~-· ·········-·

Flights of Assorted Shells (5 Shells)

Total Number of Three Inch Shots f:.2.9.'.'l:

Shell Type Quantity of Shots

Superb Unique Multi-Effect Shellsl :rn

Superb Unique Multi-Effect Shells2 (1_8

Superb Unique Multi-Effect Shells3

r .

i~.8

Fancy Assorted Colors & Effects w/ Tails ii8 ! __ . ___

Extra-Fancy Style Pattern Shells

11.~ Assorted Canister w/Color & Special Effects 15·· I ... Flights of Assorted Shells (5 Shells) /?O

Total Number of Four Inch Shots fi.~_S_ . . !

Shell Type Quantity of Shots

Superb Unique Multl-Effect#l

Extra Hard-Breaking Shells

Fancy Assorted Colors & Effects w/ Tails

Extra-Fancy Assorted Shells \~2.

Total Number of Five Inch Shots r72 1~.

Shell Type Quantity of Shots

Superb Unique Multl-Effect#l

\.~°-----· .. Superb Unique Multi-Effect#2 Jia· - -· ·

Extra Hard-Breaking Shells iio I .....

Assorted Fancy Style 110

Total Number of Six Inch Shots f 40 t~

.. ·-]

. ___ __]

i .... J

.i J

l ..... ..l

·1 --' -····-·1

j ·i

··-·--·-1 l ·-·1 I j

Cakes Shell Type Quantity of Shots

100 Shot "Z" Sliver Wave to Red !100 I - -·.----·------------·

········i . .J 100 Shot Red/White/Blue Chrysanthemums 1100

100 Shot Peony & Salute iiao __ _

1 .......... .

300 Green Whirl with Red Spinner i300 '---.--·-·· - 300 Sliver Glitter and Crackling Crossett! _____ J

600 Shot Red/White/Blue Crackling with Reports .. J 600 Shot Hundred Flowers In Blossom

600 Shot Silk Willow . - -·--i

Total Number of Cake Shots l2]_g_6. · i

You can expect the following types of effects in the main portion of the show

• These Shells Will Include Blue and Whlte Peonies With Salutes, Red Crackling Chrysanthemums, Silver Spiders, Glittering Green, Whistle And Stars, Coconut Trees, Color Diadems, • Peony with Color Changing Cores, Chrysanthemums with Color Changing Plstils • Premium Shells wlth Patterns(Triple Rings, Star & Ring, Butterfly),Shell of Shell with 100's of Assorted Breaks, Twinkling Kamuro, Falling Leaves, Crackling Dragon Eggs with Tails • Shells That Include A Large Burst of Color Followed By An Additional Burst of Either Heavy Titanium Reports, or Additional Color Breaks! You Can Expect A Variety of Patterns Such As 5-Pointed Stars, Rings, Saturns,

Hearts or Bowtle Shaped Effects. • Premium Assorted Color Shells with The Latest and Greatest ... Color- Changing Chrysanthemums & Peonies w/Pistlls & Palm Tree Cores, Splitting Comets, Crackling-Sizzling Stars, Half and Half Colors, Strobing Stars Brocades, Willows & Many More!! • Authentic Italian Style Shells with A Color Break & Special Effects including Multiple Reports, Screaming Sliver-Tail Whistles, Golden Serpents, Heavy Timed Reports, Tourbillions!

Battle In The Clouds, Fish And Whistles, Serpents, Tourbilllons, Gold Brocades, Red Waves, Silver Flashing Rings, Multl-Break Peanut Shells, Canister Shells, Titanium Salutes, Sliver Dahlias, Red To Blue Peonies, Palm Trees, Chrysanthemums With Salutes That Strobe, Just To Name Just A Few.

Five Shells Fired Simultaneously ... Mlnl Barrages of Special Effects Such As Rings, Patterns, Brocades, Palm Trees, Assorted Colors & Salutes with Rising Tails. • Four Shells Fired Slmultaneously ... Mlnl Barrages of Special Effects Such As Twinkling Kamuro with Long-Hanging Curtain effect, 3 Color-Changing Peony

with Double Pistil & Tall, Large Trailing Tiger Tail to Peony A Tropical Island Sunrise of Colour!! Fort Knox Does Not have as much Gold as this Effect! Fast and Furious Semi-Blinding Crackling and Flashing Nirvana!! • Blastlng 250 Feet Of Air With A 3 Dozen Trilogy Of Triple Effects! • Extremely Huge Sky Filling Bursts of Aqua Marine and Silver Pistils!! • In The Far East Where the Sunset Meets The Sunrise ..... This Is What it Looks

Like in The Sky! • Extreme-Rapid-Fire Assault With Color In The Near-Air • Double Breaks Of Noise coupled with U.S.A Colors! An Amazing Array Of Crackling Bursts That culminate With A Bang

As The Bdlliant Colors Are Illuminating 'fhe Night Sky Your Crowd Will Be Witnessing The Difference That Sets Us Apart. Our Exclusive Effects, Not Seen In Most Displays, Coupled With Our "Talented Shooters" Will Have Your Crowd Delighted Long After They Have Left The Parking Areas. Our Material Consisting Of The Finest Quality

Shells Complimented With Your Custom Designed Display Will Ensure You An Exhibition Of "Fire-In-The-Sky" That Is Truly Magnificent!

Grand Finale 1157 Total Shots: '

3 Inch Shells Shell Type Quantity of Shots

Finale-Assorted Color w/ Tails (10 Shells) 90

Finale-Titanium Salutes (10 Shells) 90

Flnale -Red/White/Blue Peonles-w/Talls (10 Shells) 60

Finale-Glittering Long-Duration Brocade w/Talls(10 Shells) 60

Total Number of 3 Inch Shots ria~-·· ········-1 I

4Inch Shells Shell Type Quantity of Shots

Finale-Assorted Color w/ Tails (10 Shells) 10

Finale -Red/White/Blue Peonles-w/Talls (10 Shells) 10

Flnale-Glltterlng Long-Duration Brocade w/Talls{iO Shells) 10

Total Number of 4 Inch Shots!~-~

5 Inch Shells Shell Type Quantity of Shots

Flnale -Red/White/Blue Peonies-w/Talls (5 Shells) 5

Flnaie-Glitterlng Long-Duration Brocade wfTalls(S Shells) 10

Total Number of 5 Inch Shots\ 1S

6 Inch Shells Shell Type Quantity of Shots

Finale -Red/White/Blue Peonies-w/Tails (4 Shells) 8

Finale-Glittering Long-Duration Brocade w/Talls(4 Shells) 4

Total Number of 6 Inch Shots [i2 ·

Cakes Shell Type Quantity of Shots

600 Shot "V" Brocade Crown Salute 600

100 Shot Quick Whistles 200

Total Number of Cake Shots \.~p.q

You can expect the following types of effects in the closing portion of the show

• A Simultaneous Mixture of Flower-Shaped Bursts of Assorted Color! • Titanium Flash with Ear-Splitting Pounding Thunder Sound!!! • SPECTACULAR Arrangement of Rapid-Fire Shells of Red, White & Blue Peonies with rising Color Tails & Whistles. • Without A Doubt...A Magnificent Barrage Arrangement of Suspended Duration Glittering Brocade Diadems w/Sparkling Tails! • Glittering Gold Exploding Brocade Diadems • The Crowd Will Observe A Multitude of Instantaneous Ascending Silver Screaming Whistles

'To experience the crescendo that is our "Signature" finale is an

encounter with the arts that many describe as "Second to None". You will realize why our fans become our clients and our clients "Our Family"

Bette's Bounces, LLC

1937 MacDade Blvd, Woodlyn, PA 19094 Phone: 610-358-4772 Fax: 610-884-7999 Website: www.bettesbounces.com Email: bettesbounces@rcn.com

East Goshen Township Jason Lang

1661 Paoli Pike West Chester, PA 19380 Phone: (610)692-7171 3101 Cell Phone: (610)656-8718 Email: jlang@eastgoshen.org

InvNo Name INV781 Whackv Obstacle Couse P1192 Giant Dual Lane Slide INV627 Animal Kinadom Toddler Town 160 Castle Moonbounce IE121 Trackless Train - Electric (Includes Stafflno) INV506 World of Sports Game P96 Wrecklno Ball P104 Carnival Booth 905 3'x8' Rectangular Table for carnival booths 708 4 Hour Attendant Giant Dual Lane Slide, Animal Kingdown Toddler Town, Castle Moonbounce, Whacky Obsacle Course,

Wreck/na Bafl INV97 Hioh Striker (10ft) 512 Hiah Striker (5ft) P1353 Rina Toss 507 Tic Tac Toe 509 Crazy Hat 903 Generator

oower orovided at no cost

Qty

1 1 1 1 1

1 1 2 3

5

1 1 1 1 1 3

Order Subtotal: Discount (20.00%):

Delivery Charge:

TOTAL:

Amount Paid:

Balance Due:

Total $399.00 $599.00 $399.00 $199.00 $799.00

$399.00 $599.00 $550.00

$0.00

$600.00

$199.00

$0.00 $0.00 $0,00 $0.00 $0.00

$4,742.00

($828.40)

$0.00 $3r913.60

$0.00 $3,913.60

Bette's Bounces & Carnival Attractions RENTAL AGREEMENT, RELEASE AND ASSUMPTION OF RISKS

TERMS AND CONDITIONS/WARRANTY

Order No: 42612

Order Date; February 9, 2018

Written by: Matt

Start Date & Time: Jun 30, 2018 4:00 pm

End Date & Time: Jun 30, 2018 8:00 pm

Delivery method: Delivery

Occasion: Community Day

Surface: Grass

Additional Notes: Reserved By: Matt 50% Deposit Required to Secure Date

Rain Date of 7 /1/2018

1. By accepting delivery of rented items, customer agrees to all terms and conditions shown on this rental contract. Customer acknowledges the s/he has received in good order all rented items and other goods listed on the contract. 2. Customer assumes full responslb!ll!y for all rented items, including their safe and proper use, operation, maintenance, and return to Belle's Bounces. Customer Is responsible for all loss, damage or repair. 3. Retaking of Equipment: If customer fails to return all rented Items upon agreed time, customer agrees to pay for all addllional charges. If customer refuses to return rented Items, the customer agrees that Bette's Bounces and Its agents may take all reasonable actions necessary to recover rented Items without prior notice or legal process. RELEASE OF LIABILITY 4. Duly of Participants: It is recognized that some activities conducted by Bette's Bounces are hazardous to participants regardless of all feasible safety measures which we can take. All participants have a duty to act as a reasonable prudent person when engaging in the recreational activities which are offered by Bette's Bounces. I hereby covenant and agree not to:

A. Act In any way which shall interfere with the running or operation of Bette's Bounces when such activities conform to the rules and regulations of the State of Pennsylvania.

Printed on 2/9/2018 04:01 PM Page 1 of 3

Rental Agreement for Order# 42612

B. Engage In any harmful conduct or willfully or negligently engage In any type of conduct which contributes to or causes Injury lo any person. C. To embark In any self Initiated activity without first Informing Bette's Bounces of my Intentions and receiving permission from Bette's Bounces to engage in such self Initiated activity. 5. I understand and acknowledge that the activity which I am about lo voluntarily engage In as a participant bears certain known risks and unanticipated risks. those risks Include, but are not limited lo falllng, slipping, crashing and colllding and could result In injury, illness, disease, emotional distress, death and/or property damage to myself or my guests and Invitees. 6. In consideration of the services and or property provided, I for myself and any minor children for which I am the parent, legal guardian or otherwise responsible, any heirs, personal representatives or assign, do hereby release Bette's Bounces, It's prlnclpals', directors, officers, agents, employees and volunteers from any llablllty and waive any claim for damages arising from any cause whatsoever (except that which Is gross negligence). 7.Rules: Lessee agrees to supervise both the equipment and Its use at all times said equipment is in the possession of the lessee. Accompanying this contract Is a set of directions for use and safely rules that I agree to follow and utilize at all times during the operation and use of the Interactive inflatable game. Lessee Initial Here I have been explained lhe following: Waler Slides that have a pool liner attached shall not be removed. By removing this liner, it creates an unsafe ride, therefore Bette's Bounces & Carnival Attractions and It's employee's will not be responsible for any Injuries occurring. HARMLESS PROVISIONS B. Lessee agrees lo Indemnify and hold lessor harmless from any and all claims, actions, suits, proceeding costs, expenses, damages and llabllllles, Including reasonable attorney's fees arising by reason of Injury, damage or death lo persons or property, in connection with or resulting from the usage of equipment Including but not limited to the manufacture, selection, delivery, possession, use, operation, or return of the equipment. 9. Lessee hereby releases and holds harmless lessor from injuries or damages Incurred as a result of the use of said equipment unless lessor is operating the equipment and Is deemed by a court of law to be negligent In Its actions. Lessor cannot under any circumstances be held llable for Injuries as a result of acts of God, nature, or other conditions beyond Its control or knowledge. Lessee also agrees to indemnify and hold harmless lessor from any loss, damage, theft, or destruction of the equipment during the term of this contract and any extension thereof. DUTY TO MITIGATE 1 O. In the event of injury, damage or loss due lo lessor's negligence, lessee agrees and assumes the duly lo mitigate all cost~ resulting from said injury, damage or loss. DISCLAIMER OF CONSEQUENTAL DAMAGES 11. By signing this contract, lessee agrees lo forego seeking any consequential damages in the event of any injury, damage or loss due to lessor's negligence. I acknowledge and cerlify that I J1ave had sufficient opporlunity to read this entire document, that I understand Its content and that I execute J( freely, intellfgently and without duress of any kind and agree to be bound by its terms.

LESSEE:

Slgnature:, _______________________ .Dale: _________ _

Bette's Bounces & Carnival Attractions SAFETY RULES & OPERA TING INSTRUCTIONS

• Insure that all safely rules and operating instructions posted on the front of the inflatable are followed. •A trained operator(s) must be on duly at all times. • In case of high winds or storms, have all persons exit the Inflatable and then unplug the unit and let it deflate. • Remove all sharp or pointed objects from pockets • No Silly String is to come in contact With the Inside or outside of the unit • No food, drinks or gum chewing allowed • Remove shoes, eyeglasses and jewelry *No flips, somersaults, rough play, piling on or wrestling • Do not bounce against sides or near the front entrance way. Do not bounce into corner posts. • Do not climb on side walls or nets • Keep a safe distance between kids bouncing in the inflatable • No jumping or silting on the entrance ramp * No jumping off of the top of the sllde * Only allow simllar sized riders In the inflatable at once * Follow the maximum number of riders guidelines as posted on the Inflatable * Follow the maximum weight limit as posted on the inflatable * Do not let the Inflatable rub up against any surface * Do not move the bounce from the location where set up • Individuals with head, neck or back Injuries or disabilities, pregnant women, small infants, and others who may be susceptible lo Injury from falls, bumps, or bouncing are not permitted In lhe unit at any lime. *Waler hoses or water must nol be used in the inflatable unless speciflcally manufactured for use with water. * If the inflatable starts to deflate, have all riders exit immediately and then check for one of the following conditions: *the blower motor has stopped; In which case check the power cord connection at the outlet to make sure that It has not been unplugged. If nol, check lo make sure a circuit breaker was not tripped. * If blower molar continues to run; check for blockage of air intake screen on the side of the blower unit. Also check all air tubes on the back of the inflatable for snugness and lighten ties if necessary. * If either of these steps corrects the problem, fully re-inflate the unit prior to permitting anyone to use it. • If you cannot correct the problem, call our office at 610.358.4772

Rain/Weather Cancellations: We don't charge for cancellations due lo weather. You must cancel by Barn the morning of the event In order to be refunded. Deposits: Are non refundable, but transferable for a one year period of time.

*$500 CHARGE FOR SILLY STRING USED IN INFLATABLElll *NO PERSONAL CHECKS ACCEPTED/

Printed on 2/9/2018 04:01 PM Page2 of3

Rental Agreement for Order # 42612

I agree to follow and utilize these Safely Rules & Operating Instructions at all limes during the operation and use of the Interactive inflatable game.

Customer Name {please print):. ____________________________ _

Signalure: _______________________ .Dale: __________ _

Printed on 2/9/2018 04:01 PM Page3of3

Jason lang

From: Sent: To:

onestoppartyshop@comcast.net Tuesday, February 13, 2018 10:34 AM jlang@eastgoshen.org Subject: Your Quote from One Stop Party Shop - Quote #2248

um One Stop Party Shop

QUOTE #2248: Your Quote: Please Note: This quote is for informational purposes only. The inventory has not been reserved. Please place an order online or call our office to reserve this date. Weekends fill up fast so reserve early for best selection. Please Note when reserving: Deposits are nonrefundable

510 E. Barnard St. Unit 59 West Chester, Pa 19382 Important Information - Please Read Below! 610-431-1203 onestoppartyshop. biz

East Goshen Township Jason Lang

1661 Paoli Pike West Chester, PA 19380 jlang@eastgoshen.org

610-692-7171/610-692-7171 Quote Created by: Perry Camerlengo Customer Comments:7 EVENT STAFF IS FOR 6 INFLATABLES & TRACKLESS TRAIN OPERATOR- RAIN DATE JULY lST

·.· ".. · .. - Sat, Jun 30 4:00 - 8:00 pm I 0 t! Double Lane Dry Slide $500.00 x 1 = $500.00 I 0 ~Barnyard Petting Zone Toddler Bounce $250.00 x 1 = $250.00 I 0 fi Plain Jumper I 0 fi 40' Caustic Obstacle Course I 0 ~j Trackless Kiddie Train Ride I 0 J! World Of Sports

$250.00 x 1 = $250.00

$400.00 x 1 = $400.00

$600.00 x 1 = $600.00

$400.00 x 1 = $400.00

1

I 0 I! Wrecking Ball $500.00 x 1 = $500.00 I 0 If Mini Clown Striker $75.00 x 1 = $75.00 I 0 I! Hi-Striker $200.00 x 1 = $200.00 I 0 Ii Tic Tac Toe $40.00 x 1 = $40.00 I 0 I~ Ring Toss $40.00 x 1 = $40.00 I 0 lf Can Smash $40.00 x 1 = $40.00

l 0 ti Carnival Game Booths $60.00 x 3 =$180.00

l 0 Ii 5500 Watt Generator $100.00 x 3 = $300.00 I @ ti Staff I Attendant $140.00 x 7 = $980.00

Sub Total $4,755.00

Delivery fee - Yes I need Delivery $75.00 $4,830.00

Tax: 0%

A few tips and reminders: (PLEASE READ BELOW)

$0.00 $4,830.00

Total $4,830.00 Min Payment Req'd $1,449.00

Due $4,830.00

I) We accept cash and most credit cards (not AmEx). If paying with cash, please note that our drivers don't carry change. Payment is due at time of set up. Due to Uie number ofretumed checks we no longer accept checks as n fonn of payment.

2) Please cull our office if you have stairs or a tiered backyard, so we can discuss setup options.

3) We can set up on most surfaces but not rocks or sticker patches of rn1y kind If this type of topography is all you have, please rent "tarping 3 thick" under concessions and add-ons and/or tarp 3 U1ick before our delivery/setup. Please call us if you are unsure.

4) All inflatable units MUST be staked in the ground for safety. If this is not possible, you will need to select jumper placement to be around secure items that we can tie off to, i.e. telephone poles, fence posts, etc. The unit must be secured on atlenst 3 comers. Sandbags are not safe for most setups and as a result we do not use them.

5) We will call you the day before your event wiU1 a set up time (we sometimes have to arrive very early to get all of Uie jumps out on time but we do not charge for the extra time)

6) Please call as early as possible if you need to cancel for weather or any other reason. Once we've set up, we do not give refunds for any reason including weather. Please see the FAQ and Policies pages on our web site.

7) If your event will be at a park. Please tell us. It affects our scheduling and your pricing. You will need to eiU1er provide electricity within 50' or rent a generator which we can provide at an additional cost.

We want your party to go as smoothly ns possible. Please call if you have any questions. Thanks I

2

Memo East Goshen Township

Date: To: From:

March 14, 2018 Board of Supervisors Rick Smith, Township Manager Re: Township Building Improvements- Wash Bay

As requested I issued an RFP for a professional consultant to develop plans & specifications and bid documents for the wash bay. The project is divided into three phases: Phase 1 - Design, Phase 2- Bid/Contract Documents, and Phase 3 - Construction Services. I asked for costs for Phases 1 and 2. I did not ask for a cost for Phase 3, since there are some unknowns with the stormwater management, which could affect the amount of inspection that will be required.

We received three responses to the RFP.

Remington & Vemick, Conshohocken PA Phase I- $40,750 Phase 2 - $10,700 Total $51,450

Pennoni Associates West Chester, PA Phase 1- $63,000 Phase 2 - $5,000

Carroll Engineering Warrington PA Phase 1- $34,202 Phase 2 - $83,989

Total $68,000

Total $118,191

I also asked for references for similar projects. I contacted the references for Remington & Vemick listed below and received positive responses.

Hamilton Township Municipal Authority, Chambersburg, PA - Designed a maintenance building with a wash bay in 2007.

Borough of Paramus, New Jersey- Provided mechanical, electrical & plumbing designs, and structural & civil engineering for a 50,000 sq. ft. maintenance garage in 2016.

Borough of Phoenixville, PA - provide engineering and construction management service for streets department building. Building is still under construction.

Motion - I move that the Board accept the proposal from Remington and V ernick in the amount of $51,450.

F:\Data\Shared Data\Public Works Dept\Buildings\Twp. Bldg. 1580 Paoli Pike\Wash Bay\Memo to BoS 110917.doc

REMINGTON & VERNICK ENGINEERS

EAST GOSHEN TOWNSHIP

1580 Paoli Pike West Chester, PA 19380-6199

922 Fayette Street Conshohocken, PA 19428

0 : (610) 940-1050 F: (610) 940-1161

March 8, 2018

Attn: Rick Smith, TownslJip Manager

Subj: Request for Proposals

Professional Consultant to Develop Plans & Specificathms Wash Day to be Constructc(I at the Township Building

Deai' Mr. Siuith:

REMINGTON & VERNICK ENGINEERS (RVE) is pleased to s11bmit this proposal to provide engineering and construction support services for a new Wash Bay at the East Goshei1 Township Building. This submission has been prepai'ed in ac;co1'dance with the requirements set fo1th in the Township's Request for Proposals (RFP), issued February 9, 2018.

We one of the oldest, established consulting engineering firms in the country, founded in 1901 by J.C. Reinington. Our pi·ofessional engineering staff represents a diverse group of public and private clients, We have served some of thl!se clients for moi·e than a century!

The professional staff available to supp01'l East Goshen Township inch1des expe11s in all areas of engineering and Cbnstructioii tnanageihent st!j)po1t. Service is what sets us apart. Our staff delivers attentive, responsive, professional services. The staff applies its knowledge, creativity and co1i11.nitment to meet the varied and complex needs of oui· County clients.

You will find all the information requested in this proposal. We begin with the cost ai1d scope ofo\11' services, along with a ptoposed project schedule. Then ypu Will find more detailed information on RVE's capabilities ;:ind the experience pf the project team we have selected to support this project in East Goshen.

RVE is the personnel and al:>ilities to c01nplete the services required and constrnct the new Wash Bay at the Townshfp Building. We tmst the information provided deems us quiilified. Should you have any questions or require additio.nal information, please do not hesitate to co at (609) 645-7110.

Sincerely, '.REMINGTON & VERNI CK ENGINEE~S

By ~()~

Edward Vernick, PE, CME President

www.rve .com

ARCHITECTURAL & ENGINEERING CONSULTING SERVICES

Section

1 TECHNICAL PROPOSAL

DETAILED BREAKDOWN OF PROJECT COSTS Page 12

SCOPE OF SERVICES Page 12

SAMPLE STANDARD CONTRACT Page 14

PROJECT SCHEDULE Page 14

MUNICIPAL REfERE CES Page 14

THE RVE TEAM Page IS

EXPERIENCE & KNOWLEDGE Page 18

LOCATION OF OFFICE TO SUPPORT THE CO TRACT Page 114

2 PROJECT TEAM RESUMES

3 PROJECT EXPERIENCE

4 SAMPLE CONTRACT

2018-70 I TOWNSHIP OF EAST GOSHEN

,----

.-· .-----

PROFESSIONAL CONSULTANT SERVICES

Remington & Vernick Engineers (RVE) is one of the oldest, established consulting engineering firms in the country, founded in 1901 by J.C. Remington. Our professional engineering staff represents a diverse group of public and private clients. We have served some of these clients for more than a century!

The Engineering News Record consistently ranks the firm in the top 300 design firms and top 100 construction management firms in the nation. The Philadelphia Business journal lists the company as one of the top 10 engineering firms in the tri-state area. These achievements attest to the professionalism and commitment to quality the firm has possessed throughout its century in business.

Today, our team of highly skilled, committed

professionals takes great pride in the work they do . . . recognizing it proclaims their leadership and expertise in serving our diverse clients

RVE offers the Township of East Goshen the services and experience presented in this proposal. As requested, we start with a detailed breakdown of the costs, the services to be performed and a proposed project schedule.

G

©

EXPERTISE ACROSS THE BOARD

Pre-Design Work Structural Engineering

Site Analysis Services Civil Engineering

Schematic Design Mechanical, Plumbing & Fire Protection Engineering

Design Development Electrical & Lighting

Engineering

Cost Estimating Geotechnical Engineering

Construction Documents Soils Testing

Post-Construction 0 Phase I & II Environmental Administration Assessments

Specific details of our specific service capabilities

are provided later in this section for your review

J.C. REMINGTON

FOUNDER & ENGINEERING PIONEER

The role of the Consulting Engineer remains constant:

To responsively serve and realize the needs of the public sector in a precise, timely and cost-effective

manner.

2018-70 I TOWNSHIP OF EAST GOSHEN

WASH BAY AT THE TOWNSHIP BUILDING PROFESSIONAL CONSUL TANT SERVICES

DETAILED BREAKDOWN OF PROJECT COSTS Phase 1 Design:

Phase 2 Contract Documents & Bidding:

Phase 3 Construction Services: (This one may be awarded separately per the RFP)

SCOPE OF SERVICES

$40,750.00

$10,700.00

$25,460.00

Page I 2

The general scope of engineering services for this project will include the preparation of design documents for the proposed construction of the new Wash Bay Addition located in East Goshen Township, PA. The

building will be connected to the existing Township Building. The proposed structure will be approximately 24 feet by 50 feet with brick facing exterior finishes and roof configurations to match the existing building. The detailed breakdown of the Scope of Work as listed in the Request for Proposals is included in our Scope of Engineering Services for this project. The tasks will be completed in the following project phases.

Phase 1: Design Provide design information to the Township for their review. The following tasks will be included.

1. Review any existing drawings on the Township building. 2. Perform a site visit to verify the existing site conditions. 3. Coordinate with the Township to prepare a concept building and site layout plan. 4. Review and use any available existing geotechnical information from previous investigations at this site. 5. Survey a. Provide a topographic partial survey of the site. b. Survey will include verification of existing property corners and setting any new corners as required. 6. Mechanical a. Perform HVAC heating, cooling, & ventilation calculations in accordance with all applicable codes and standards. b. Investigate the adequacy of the existing mechanical systems to determine the ability of these systems to service the new addition. c. Design HVAC system, including all equipment, ductwork, controls, piping, and accessories. d. Provide Mechanical designs in accordance with all applicable codes and standards. 7. Plumbing: a. Investigate the adequacy of the existing plumbing systems to determine the ability of these systems to service the new addition. b. Design/specify plumbing fixtures such as floor drains, hose bibs, wash down hose, mop sink, and an electric gas or water heater. c. Design water distribution piping and hot water systems. d. Provide Plumbing designs in accordance with all applicable codes and standards. 8. Electrical: a. Investigate the adequacy of the existing electrical systems to determine the ability of these systems to service the new addition. b. Perform calculations of lighting levels, power distribution, and other electrical calculations required to design the project. c. Design the lighting system, fire alarm system, generators/backup power, power distribution system, and IT/Data system distribution to support the proposed building. 9. Fire Protection: a. Investigate the adequacy of the existing fire suppression system to determine the ability of these systems to service the new addition.

2018-70 I TOWNSHIP OF EAST GOSHEN

WASH BAY AT THE TOW SHIP BUILDING PROFESSIONAL CONSUL TANT SERVICES

10. Civil/Site

Page l 3

a. Determine the extent of the existing underground storm water management basin that needs to be relocated to accommodate the addition. b. Investigate options to re-configure the basin to maintain the existing capacity. 11. Structural a. Provide structural design for the foundations, roof framing, and wall framing of the proposed wash bay addition. b. Provide miscellaneous structural plans, details and specifications as required for any site or building improvements. 12. Prepare budget construction cost estimates. 13. Prepare a complete set of building plans and details for construction. 14. Prepare a complete set of building specifications for construction. 15. Submit completed plans and specifications to the Township for coordination, review and approval. 16. Revise the plans and specifications to address any comments from the Township. 17. Provide signed and sealed plans for any required reviews or permitting.

Phase 2: Bid/Contract Documents Based on the approved design plans and specifications, prepare construction plans and specifications for the bidding of the proposed project. The final design documents will incorporate comments received from the design submission. The following structural tasks will be included:

1. Submit final bidding documents to Township for final review. 2. Finalize all bid documents. 3. Advertise the project for bid using PennBid. 4. Respond to bidder's questions. 5. Issue Addenda to clarify the scope of work, if required. 6. Review bids and provide award recommendation. Submit plans to the local code official as required. 7. Attend bid opening, review project bids and provide an award recommendation.

Phase 3: Construction Services The following services will be provided during the construction services phase:

1. Set up and conduct the pre-construction meeting with the contractor and the Township. 2. Attend project coordination meetings with contractor during construction. 3. Prepare agenda and meeting minutes for all project meetings. 4. Provide monthly progress reports to the Township. 5. Review all shop drawing submissions to verify compliance with the contract documents. 6. Review all change order requests. 7. Respond to Request for Information, including preparing necessary sketches to resolve unforeseen field conditions, if required. 8. Review all laboratory and test reports provided for this project. 9. Provide engineering support, periodic inspection, and direction during construction. 10. Provide observation of all performance testing required by the specifications. 11. Review payment requests and provide recommendation for payment. 12. Prepare punch list prior to final inspection. 13. Set up final inspection and provide report of completed project, including as-built plans of the final project. 14. Complete project close out.

2018-70 I TOWNSHIP OF EAST GOSHEN

EGOS 0012

Board of Supervisors East Goshen Township 1580 Paoli Pike West Chester, PA 19380

RE: Request for Proposal Wash Bay at Township Building

Dear Supervisors:

March 8, 2018

One South Church Street

2"d Floor West Chester, PA 19382

Ph: 610-429-8907

www.pennoni.com

We are pleased to submit the following proposal for the above referenced project. Pennoni has a vast range of experience in the design of Publics Works Facilities including new facilities recently completed in Valley, Haverford and Lower Merion Townships.

In accordance with the February 9, 2018 Request for Proposals, please find the following requested information and the associated costs for each of the Phases indicated:

Phase 1- Design

Our anticipated scope of work within this Phase shall include:

1. Review available plans and perform site visits to verify key components, dimensions and elevations. 2. Investigate the adequacy of the existing electrical, mechanical, and fire suppression systems to determine the ability of these systems to service the new addition. 3. Determine the extent of the existing underground stormwater management basin that needs to be relocated to accommodate the addition. 4. Investigate options to re-configure the basin to maintain the existing capacity. 5. Prepare draft Architectural, Structural, Electrical, Plumbing, HVAC and Fire Protection drawings and details depicting the proposed addition and associated improvements. 6. Prepare a limited site plan depicting the location of the addition, existing features, key utilities and modifications to the stormwater management basin. 7. Meet with the Township to review the design and associated details. 8. Revise the plans to incorporate Township comments. 9. Provide two (2) sets of signed and sealed drawings.

Our estimated lumps sum fee to complete the above scope of services for Phase 1 is $63,000.

EGOS 0012 Rick Smith

March 8, 2018 Page 2 Public Works Garage Addition

Please note, the above fee does not include any upgrade or re-design of the existing Electrical, Plumbing, HVAC or Fire Protection Systems to accommodate the new facility, meet current code requirements, or retrofit systems that are no longer supported by the manufacturer.

The design also does not include the reconfiguration nor extension of the Township's current building access/security system.

Phase 2 - Bid/Contract Documents:

Our anticipated scope of work within this Phase shall include:

1. Prepare plans and specifications for public bidding and review with Township. 2. Finalize bid documents. 3. Complete advertisement, post bid documents using PennBid. 4. Conduct one (1) pre-bid meeting; prepare meeting minutes. 5. Respond to questions from bidders. 6. Review submitted bids, prepare bid tabulation and award recommendation.

Our estimated lump sum fee to complete the above scope of services for Phase 2 is $5,000.

Phase 3 - Construction Services:

The scope of work outlined under this Phase shall include:

1. Review of shop drawings for major components of the project. 2. Provide inspection services during construction as requested by the Township. 3. Attend pre- and post-construction meetings and interim meetings as requested by Township. 4. Complete a final inspection, prepare a punch list and complete a review of contract closeout documents.

An estimated fee will be provided to the Township upon request.

Other Items:

1. Sample Contract for Services: Please refer to Appendix A for Pennoni Standard Terms and Conditions.

r:\projects\egos\0012 public works garage addition\pw garage rfp 030918.docx

EGOS 0012 Rick Smith

2. Project Schedule:

a. Phase 1- Design

March 8, 2018 Page 3 Public Works Garage Addition

i. Commencement of work: ii. Completion of all tasks:

Within ten (10) days after Notice to Proceed Within ninety (90) days after commencement of work

b. Phase 2 - Bid/Contract Documents

i. Tasks 1-2: Commence work within five (5) days after approval of design by Township; Complete work within fourteen (14) days. ii. Tasks 4-6: Concurrent with bidding process.

3. Municipal References:

Please refer to Appendix B for municipal references within the surrounding area.

Should you have any further questions, please contact me.

Sincerely,

PENNON I ASSOCIATES INC.

Nathan M. Cline, PE Township Engineer

cc: Mark Miller, Director of Public Works (via email)

r:\projects\egos\0012 public works garage addition\pw garage rfp 030918.docx

~T Carroll Engineering Corporation

March 9, 2018

Rick Smith, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6199

Dear Mr. Smith:

Subject: Proposal for Professional Services; Vehicle Wash Bay

rsmith@eastgoshen.org

We propose to render professional engineering services in connection with the design for the Vehicle Wash Bay as desc1'ibed in detail in the Township's Request for Proposals dated February 9, 2018

(hereinafter called the ''Project"). You are expected to furnish us with full information as to your requirements including any special or extraordinaty c:onsiderations for the Project or special services needed, and also to make available all pertinent existing data.

Our engineering services will consist of preparing a Preliminary Design and Final Design Documents and- assistance during the Bidding Phase. We shall provide Basic and Additional Services as set forth below.

A. Preliminary Design Phase Services

1. Prepare Preliminary Design documents consisting of final design criteria, preliminary drawings, outline specifications and written descriptions of the Project.

2. Provide necessary field surveys and topographic and utility mapping for design purposes. Utility mapping will be based upon information obtained from utility owners.

3. Based on the information contained in the Preliminary Design Phase documents, submit an opinion of probable Construction Cost.

4. Furnish two copies of the Prelitnina1y Design Phase documents to and review them with the Township.

Corporate Office: 949 Easton Road Warrington, PA 18976

216.343.5700

rtodizy's Co111111it_ment t (i 'Tomortcm!'s Cliai fe 119l!s

630 Freedom Business Center Third Floor King of Prussia, PA 19406

610.489.6100

101 Lindenwood Drive Suite 225 Malvern, PA 19355

484.875.3076

EGT 18-0068 (2018-3-9_0202_001) vvww.carrollengineering.com

105 Raider Boulevard Suite 206 Hillsborough, NJ 08844

908.874.7600

East Goshen Township Page Two March 9, 2018

B. Final Design Phase Services. After acceptance by the Township of the Prellininaty Design Phase documents and the opinion of probable Construction Cost, but subject to any Township-ditected modifications ot changes in the charactet or design tequirements of ot fot the Project, we shall:

1. On the basis of the above acceptance and ditection, ptepare and. furnish final Drawings indicating the scope, extent, and chatacter of the Wotk to be performed and furnished by Contractot. Specifications will be prepared, where appropriate, in general conformance with the standard format of the Construction Specifications Institute.

2. Prepare and furnish Bidding Documents for review and approval by the Township, its legal counsel, and other advisors, as apptopriate.

3. Advise the Township of any adjustments to the opinion of probable Construction Cost and any adjustments to the Total Project Costs known to us.

5. Furnish two copies of the Final Design Phase (bidding/ contract) documents to and review them with the Township.

C. Bidding Phase Services

1. Assist the Township in advertising for and obtaining bids for the Work, maintain a record of prospective bidders to whom Bidding Documents have been issued, and attend the pre-Bid

conference.

2. Issue Addenda as appropriate to clarify, correct, or change the Bidding Documents.

3. Attend the Bid opening, prepare Bid tabulation sheets, and assist the Township in evaluating Bids and in assembling and awarding contracts for the Work

We propose to perform the above described engineering services for a not-to-exceed fee of $118,191.00 based on the following assumed distribution of compensation outlined in Exhibit "A" of this Agreement. Expenses including reproduction, advertising, mileage and tolls, postage, and photographs, will be billed as an extra to this proposal at our standard reimbursable expense rates. We would expect to start our services promptly after receipt of your acceptance of this proposal and to complete the Preliminary Design documents in accordance with the attached schedule. Our basic services will considered complete upon commencement of the Construction Phase.

A property boundary survey of the existing plant site is not included in the above fees. The number of

prime contracts for Work designed or specified by us upon which our compensation has been established under this Agreement is three.

Construction phase services including resident setvices during construction shall be compensated for either on a time-and-material basis as set forth in the attached Schedule of Rates ot by means of a separate, individual contract for a negotiated fee.

EGT 18-0068 (2018-3-9_0202_001)

East Goshen Township Page Three March 9, 2018

Additional Services. The following services are not included, but are available if required: public and/ or regulatory agency meeting attendance, material testing, environmental assessments, providing assistance in resolving any Hazardous Environmental Condition, re-bidding of the project, Record Drawing preparation, preparation of applications and supporting documents for private or governmental grants, loans or advances in connection with the Project, preparation of zoning permit or other Township land development applications, and preparing to serve or serving as a consultant or witness for OWNER in any litigation, arbitration or other dispute resolution process related to the Project. If additional set-vices are required, fees will be invoiced on the basis of our standard hourly rates in addition to the fee indicated.

The fees stated herein are for the basic engineering services described in this proposal. If additional

sei-vices are required, fees will be invoiced on the basis or our standard hourly rates in addition to the basic fee stated.

This proposal, Exhibit "A", Exhibit "B", and the Standard Consulting Contracting Terms and Conditions attached represent the entire understanding between you and this office with respect to this project, and may only be modified in writing, signed by both of us. If this proposal satisfactorily sets forth your understanding of the arrangement between us, we would appreciate your signing the enclosed copy of this letter in the space provided below, and returning same to this office.

Thank you for this opportunity to work \vith you. Should you have any questions or require additional information, please feel free to contact this office.

Very truly yours,

CARROLL ENGINEERING CORPORATION

#1d1-) ----..

Allen B. Mason, P.E.

Senior Vice President

ABM: cam Enclosures

EGT 18-0068 (2018-3-9 _0202_001)

f}::ist Go;;hen Township Pnge Four Mru:ch 9, 2018

Accepted this 9t1• day of Match, 2018, for:

~G=n=tr=·ci=ll~E=n~gin-== · =e=e=rin=· ge-.,._~C=o=;rp~o=r=·a=tio=n~-----• by; Allen B. l\foson P.E. Name (Pri.tit)

~/L_ . Signature

Senior Vice President Title

Accepted th.is __ day of ______ , 20 _ _ , for:

-----------------·by: ------------------

Name (Print)

.Signa.t:nre

Title

Ed't 1~-0068 (2018-J.·9_b20;LOOI)

This is EXHIBIT "A", consisting of two pages, referred to in and patt of the

Agreement between EAST GOSHEN TOWNSHIP (OWNER) and CARROLL ENGINEERING CORPORATION (ENGINEER) for Professional Services dated March9,2018.

f!!_vments to ENGINEER for Services and Reimbursable Expenses

COST PROPOSAL

Phase 1 - DESIGN

1. 2. 3. 4. 5.

Review of Existing Plans and Conditions Site Visits and Measurements Preliminary Drawings 1 • 2

Meeting with Township Staff Revisions to Preliminary Design Documents

Phase 2 - BID/CONTRACT DOCUMENTS

1. 2. 3. 4.

Prepare Constrnction Documents and Specifications' Meeting with Township Staff Finalize Bid Documents Bidding Phase Services (including Pre-Bid Meeting,

Responses to Bidder RFI's, Evaluation of Bids, etc.)

Total Cost (Not to Exceed)

Footnotes:

Initial: _ _ ___ _ OWNER _ ___ _ ENGINEER _ _ _ _

$ 1,500.00 $ 3,106.00 $22,310.00 $ 1,680.00 $ 5,606.00

$68,973.00 $ 1,680.00 $ 3,600.00

$ 9.736.00

$118,191.00

1The RFP indicated that the HV AC design was to consider a heated floor as an alternative to gas powered infrared heaters. We will consider an electtic radiant heating system alternative for the floors. Evaluations ancVor design for a hydronic system would be completed as an Additional Service.

2while the RFP indicated that the existing sptinkler system is to be extended into the proposed wash bay, based on the building materials to be used, and the use, extension of the sprinkler system would not seem to be required by Code. It is assumed that the existing service or fire pump, if any, is appropriately sized to accommodate the proposed addition. Evaluations and/or design of new fire service piping or upgrades to the pumping system, if needed, would be completed as an Additional Service.

18-0068.00 (2018-3-9 _ 0202 _002) EXIDBIT "A"

61 0-692-7171

www.eastgoshen.org

March 12, 2018

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

To: Board of Supervisors

From: Mark Miller

Re: Mower Replacement

We are scheduled to replace two Z Radius Mowers. Both mowers are fully depreciated. We budgeted 20,000.00 to replace the mowers. I contacted two local vendors for COSTARS pricing. Below is a cost breakdown.

Vendor Make /Model Price without trade-in Price with trade-in Conway Power Ex-Mark 60" deck $23,308.00 $17,308.60 $11,654.30 each $6000.00 total trade

Power Pro Equip. Hustler Super Z 60" $24,350.00 $17,250.00 deck $12,175.00 each $7,100.00 total trade

I

I recommend that we purchase the two Hustler Super Z mowers from Power Pro Equipment in the amount of $17,250.00

F:\Data\Shared Data\Public Works Dept\Equipment Purchase 2018\Mower purchase 2018 .docx

610-692-7171

www.eastgoshen.org BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6-199

March 12, 2018

To: Board of Supervisors

From: Mark Miller

Re: Roller Purchase

We budgeted 50,000.00 to replace our 1997 roller, which is fully depreciated. I have received prices for a new roller from two vendors below. The pricing is on COSTAR contract.

Vendor Make /Model Purchase Price

Penn Jersey Machinery DD35B Volvo $57,000.00

asphalt compactor

54 inch drums

Ransome Cat CB36B Cat Vibratory $63,48.00 roller 55 inch drums

Stephenson Equipment Bomag 138 $48,000.00 I

Both vendors offered us $1,500.00 for our roller. I feel that number is very low and recommend that we put our roller on municipal bid for $10,000.00. At this price point, the net replacement cost would be under budget.

I would recommend that we purchase the Bomag roller for $48,000.00

F:\Data\Shared Data\Public Works Dept\Equipment Purchase 2018\Roller purchase 2018 -.docx

Memo East Goshen Township

Date: To: From: Re:

March 12, 2018 Board of Supervisors Rick Smith, Township Manager King Road and Sproul/North Chester Road Intersection Project

Last year, both East Goshen and East Whiteland Townships engaged McMahon Associates to update the 2005 Traffic Study that McMahon had prepared on what can be done to reduce the traffic backups that occur at the King Rd-Sproul/N Chester Road intersection. McMahon determined that we could improve the intersection by adding a left tum lane at all of the approaches. While this would not correct the geometry of the intersection, which in itself lengthens the signal cycles, it would allow us to eliminate the split phasing on King Road, under which westbound King Road traffic and eastbound King Road traffic each have separate signal movements. Both the geometry of the intersection and the split phasing result in longer traffic signal cycles, which in tum causes traffic to back up on all of the approaches. The estimated cost of the proposed project is just over $2 million.

McMahon also advised that the PennDOT rules have changed since 2005 and that we should look at alternatives to the above improvements, especially if we intended to seek grant money to fund them. Accordingly, McMahon also developed a concept plan for a roundabout, which from a traffic perspective would work better than the adding left turn lanes. McMahon will need to develop a cost estimate for the "round about".

On March 9th, we met with PennDOT to discuss the King Road and Sproul/North Chester Road Project. PennDOT concurred that we needed to look into the roundabout alternative, but recognized that it may not be feasible.

There is grant money available for intersection projects; however, the process is very competitive. Roundabouts are the new "hot ticket," so a roundabout project would probably score higher in the grant process than a typical road widening and signalization project.

I would suggest that the next step would be to schedule a meeting to solicit public comment from the property owners who would be directly impacted by this project.

\\2008serv\apps\Data\Shared Data\Public Works Dept\Roads\EGT & EWT Projects\North Chester and King Roads Intersection\Memo to Bos 031218_LAW.doc

Note: some text on this page could not be read reliably. Please see the original PDF for this page.

CONCEPTUAL DESIGN EXHIBIT (NOT FOR CONSTRUCTION)

Plan drawing by McMahon, improvement feasibility study for the intersection of North Chester Road/Sproul Road (S.R. 0352) and King Road (S.R. 2022), East Goshen and East Whiteland Townships, Chester County. Yellow areas show proposed pavement widening; red lines show required right-of-way and new markings.

East Goshen Township, West Chester, PA 19380. East Whiteland Township, Frazer, PA 19355. Date 7/20/2017.

Roads: SR 0352 SPROUL ROAD; SR 0352 NORTH CHESTER ROAD; SR 2022 KING ROAD; WOODCREST LANE (T-810); COTTONWOOD DRIVE (T-837). Labels: THREE TUNS TAVERN; POTENTIAL SWM; 135' TRANSITION TAPER; 75' BAY TAPER; 175' LEFT-TURN LANE; 225' LEFT-TURN LANE; 125' LEFT-TURN LANE; 80' LEFT-TURN LANE; 11' THROUGH LANE; 10' LEFT-TURN LANE; 5' SHOULDER; 4' SHOULDER; REQUIRED R/W LINE; LEGAL R/W LINE; OPEN SPACE PARCEL FOR THE LOCKWOOD CHASE DEVELOPMENT.

DRIVEWAY TO BE RELOCATED WITHIN A PROPOSED 15 FOOT WIDE EASEMENT THROUGH THE OPEN SPACE PARCEL TO MARLIN DRIVE.

ImpactQuantity
UTILITY POLE RELOCATIONS2 LARGE, 7 MEDIUM, 1 SMALL
AFFECTED PROPERTIES*13
ESTIMATED TOTAL REQUIRED RIGHT-OF-WAY (AC.)0.51 AC.

*PROPERTIES WHERE IT IS ESTIMATED THAT PERMANENT RIGHT-OF-WAY, PERMANENT EASEMENTS, OR TEMPORARY CONSTRUCTION EASEMENTS WILL BE NECESSARY.

Legend

  • PROPOSED PAVEMENT WIDENING
  • PROPOSED PAVEMENT MILL AND OVERLAY
  • PROPOSED DRIVEWAY ADJUSTMENT
  • PROPOSED NEW PAVEMENT MARKINGS
  • PROPOSED NEW CURB
  • REQUIRED RIGHT-OF-WAY LINE
  • EXISTING PAVEMENT MARKINGS
  • EXISTING CURBING
  • EXISTING EDGE OF PAVEMENT

Eight numbered notes are printed on the sheet (existing conditions, legal right-of-way, roadway improvements, potential stormwater management areas, drainage structures, temporary construction easements, utility relocations, and the Three Tuns Tavern being recommended eligible for listing in the National Register of Historic Places); text is too small to transcribe reliably.

.c---- I I r

IW .:..,..J \\

N/1" THOllAS F. KORBER .t

1

\ DANIEL J. O'DONNB.L

I I

~-----\ ------- -- - -- . \ ____ .. N,h" ANTHONY L BEJJSAR/O .t- \ DOROTHY 8£LJSARfO

~

CXJSTWC PAVCJIENT MARKINGS

- £XJSTING CURBING --- £XJST1NC EOCE OF PA Vf:MENT b CMAHQN

.1: ag14nama1101maem11a•

.tO N): 817294

294EXHIBIT

f!Alll 7/20/2017

!IV Jl -

I I I I I

N/F' NACUY PIERRE ct

DUCARNEL PIERRE

N,h" RA 'tUOND K. WAUIEJJ/ ct

.ERNIFER L WAI..HEJJJ

EAST GOSHEN TOWNSHIP

1580 PAW PIKE 'M'.ST CHESTER, PA 19380

(610) 692-7171

N,h" FERGt.ISON ct n 'YNN

ENTERPRISES, INC.

J l \

HORIZONTAL

EAST WHITELAND TOWNSHIP

2M COH£STOCA. ROAD FRAZER. PA 19J$5

{610) 1548-0600

I I I I

$Al.E

25 50 FEET

N/F' KARa. ANNE ct EDHfN H. ROBERTS II

.f?

------

H_A:" JASON T. DARST .!° ANY VAN SQ~ DARST

OtESlIR 0352 1 <F 1 EAST GOSHEN ANO EAST 'l'i'HITil.ANO TO'n~SHIPS

---+--_ ' ------1-------~ ---

1

t

N,;t:° THEOOOR£ W. BORIS

.t- NATHALIE F. BORIS

SR 0352

NOR TH CHESTER ROAD __ .::..;;,Li '_,_'_,_,,J _,' _____ LEGAl._-,"='::°"_\,_,,...,.)'--1 ---->,,-------

----------------------------------

' \ / I /

N_A:" PA TRICK J. AICCABE. /U .t

CHRISTJNE H. MCCABE I . I

1. EXISTING CONDITIONS DEPICTED ON THE CONCEPTUAL DESIGN EXHIBIT ARE BASED ON TOPOORAPHIC SUR\£¥ COMPL.ETED IN 2004 BY MCMAHON ASSOOATES, INC. MiERE TOPOGRAPHIC DATA WAS NOT AVAILABLE,, EXISTING CONDITIONS 'MRE SUPPLEMENTS 'MlH AERIAL PHOTOGRAPHY, DATA OBTAINED FROM THE PENNS'l'lVANIA SPATIAL DATA ACCESS, AND LIMITED FlEl.D \1EWS.

2. EXISTING LEGAL RIGHT-Of-WAY AND PROPERTY INFORMATION SHOVIN ON lHIS PLAN IS ESTIMATED BASED ON Pw.IS AND DOCUMENTS RECBVED FROM PENNOOT ANO DIGITAL DATA AVAn...ABLE FROM DE!AWARE COUNTY. lltlS INFORMATION HAS HOT BEEN INDEPENDENTLY \IERIFlED THROUGH FJELD SURVEY OR llll.£/ DEED RESEAROt

J. ntE CONCEPTUAi... ROUNDABOUT DESIGN EXHIBIT IS PURELY CONCEPnJAL IN NAlURE. NO DESIGN OR ANALYSIS HAS BEEN COMPL£TEO MlH REGARDS TO HORIZONTAL & Yf.RTICAL GEOMETRY, lRAFJlC, DRAINAGE, POST CONSTRUCTION STORMWAlER MANAGEMENT, RIGHT-OF-WAY OR U11Uns.

4. A FULL TRAFFIC ANALYSIS ANO DETAILED CONCEPTUAL DESIGN PLAN \li\U NEED TO BE DEVELOPED IN ORDER TO FURTHER IN\'ESTIGA'TE lHE ROUNDABOUT OPTION.

5. lHE lHREE lUNS TAVERN IS RECOMMENDED ELIGIBLE FOR USllNG IN lltE NATIONAL REGISTER OF HISTORIC PLACES. FURTHER INVESTIGATION YtlLL NEED TO BE COMPLETED DURING lHE PREUMJNARY ENGINEERING OF lHE PROJECT TO DETCRMINE IF ldEASURES NEED TO BE DE\ROPED TO MlllGATE "THE IMPACTS OF ntE PRo..ECT ON lHE HISTORIC PROPERTY.

IMPROVEMENT FEASIBILITY STUOY FOR lHE INTERSECTION OF NORTH CHESTER ROAD/ SPROUL ROAD {S.R. 0352) AND KING ROAD (S.R. 2022)

EAST GOSHEN AND EAST YIHTEL.AND TO'M-ISHIPS CHESTER COONTY

CONCEPTUAL DESIGN EXHIBIT

(NOT FOR CONSTRUCTION)

Memo

To: Board of Supervisors From: Jon Altshul Re: Updated Agreement with the Goshen Fire Company Date: March 13, 2018

Attached please find a copy of the updated agreement between the Goshen Fire Company and the Township for your consideration. This agreement updates the 1987 Agreement, as amended, to reflect the current level of administrative and overhead services that the Township provides to the Fire Company.

Recommended Motion: Mr. Chairman, I make a motion to adopt the attached agreement with the Goshen Fire Company to provide overhead and support services.

AGREEMENT

THIS AGREEMENT is made the day of , 2018 between EAST GOSHEN TOWNSHIP (hereinafter referred to as "Township"), a township of the second class, located in Chester County, Pennsylvania, and GOSHEN FIRE COMP ANY (hereinafter referred to as "Fire Company"), a Pennsylvania not-for-profit corporation, located at Park Avenue, East Goshen Township, Chester County, Pennsylvania.

WHEREAS, the Township and the Fire Company entered an Agreement dated May 5, 1987 (the "1987 Agreement") which outlined the terms and conditions under which the Township agreed to provide overhead and support services for paid employees of the Fire Company; and

WHEREAS, the 1987 Agreement was subsequently revised and amended in January of2001 and then again in July of 2017 (collectively the "Amendments"); and

WHEREAS, the parties desire to amend and restate in its entirety the terms of the 1987 Agreement and Amendments in this Agreement;

NOW, THEREFORE, in consideration of the mutual promises herein contained, the parties hereto agree as follows:

1. Definitions.

A. Collective Bargaining Agreement - The Collective Bargaining Agreement between the Fire Company and The Goshen Professional Firefighters' Association IAFF Local 4752, January 1, 2014 through December 31, 2018, and any successor agreements.

B. Paid Firefighters - Employees of the Fire Company who work a minimum of forty ( 40) hours per week for the Fire Company on a permanent basis and who, during those work hours, devote their efforts exclusively to the business and operation of the fire protection and emergency response services afforded by the Fire Company.

C. Other Paid Personnel-Paid employees of the Fire Company who are not eligible for the benefits outlined in the Collective Bargaining Agreement. Other Paid Personnel may include, but are not limited to, part-time firefighters, emergency medical technicians and administrative professionals.

D. Overhead and Support Services - Those services provided by the Township to the Fire Company pursuant to the terms of this Agreement, including salary administration, insurance coverage, pension plan administration as hereinafter identified with more particularity.

2. Overhead and Support Services - The Township shall supply the following Overhead and Support Services for the Fire Company:

A. Salary Administration - The Township shall issue paychecks to the Paid Firefighters and Other Paid Personnel and shall prepare and file all financial and tax reports for the Paid Firefighters and Other Paid Personnel that would normally be required if the Township were their employer. As part of this service, the Township shall withhold union dues from the salary check for the Paid Firefighters in amounts as directed by the Fire Company. This salary administration service shall be provided for both Paid Firefighters and any Other Paid Personnel.

B. Insurance - The Township shall be the plan sponsor for all insurance products that the Paid Firefighters are entitled to receive pursuant to the Collective Bargaining Agreement. The Township shall pay the premiums for these insurance products as part of its group plan for all Township employees subject to reimbursement from the Fire Company pursuant to paragraph 4 below; Prior to entering any new Collective Bargaining Agreement, the Fire Company shall consult with the Township to determine if such benefits are available to the Township. The Township reserves the right to change insurance providers or plans provided that the insurance coverage and benefits provided are comparable to the coverage and benefits provided by the prior carrier and provider. The Fire Company is responsible for paying the cost of providing such insurance to the Paid Firefighters. The Township shall provide to the Paid Firefighters, Other Paid Personnel and any other members of the Fire

Company who may be entitled by law to ce1iain insurance coverage that the Township is required by law to provide, which as of the date of this Agreement is workers compensation and unemployment insurance. As part of the Overhead and Support Services that the Township provides to the Fire Company, the Township shall not make any determination as to whether or not a Paid Firefighter or Other Paid Personnel are entitled to a specific insurance coverage or benefit. The Township shall be solely responsible for being the plan sponsor and administrator. The Fire Company agrees to indemnify and hold the Township harmless for any dispute between an insurance provider and a Paid Firefighter.

C. Pension Plan - The Township shall continue to be the pension plan administrator of a defined benefit pension plan for Paid Firefighters which shall comply with the guidelines of the Commonwealth of Pennsylvania and shall be eligible for state financial support under the Municipal Pension Plan Funding Standard and Recovery Act, Act No. 205 of December 18, 1984, as amended, as is outlined in Township Ordinance 78, adopted May 5, 1987, and as amended in Township Ordinance 129-K-09, adopted on October 6, 2009, and again in Township Ordinance 129-K-11, adopted on October 18, 2011. As part of its duties in administering the pension plan, the Township shall withhold and remit weekly any required employee contributions to the investment manager of the pension plan.

2

D. Deferred Compensation Plan - The Township shall provide the Paid Firefighters with access to the Township's Section 457 deferred compensation plan for both voluntary employee contributions and any employer contributions, as stipulated under the Collective Bargaining Agreement.

E. Personnel Rules and Regulations Administration - The Township shall track the sick leave, vacation leave, holiday compensation and personal time balances of all Paid Firefighters on a weekly basis and provide that information to the Fire Company upon request.

3. Fire Company Responsibilities - The responsibilities of the Fire Company with respect to the Paid Firefighters' employment shall include, but not be limited to, the following:

A. The Fire Company shall promptly notify the Township of any signed employment agreements with new Paid Firefighters or Other Paid Personnel; as well as the termination of any Paid Firefighters or Other Paid Personnel.

B. The Fire Company shall promptly provide the Township with any successor agreement(s) to the Collective Bargaining Agreement and shall provide the Township with guidance on interpreting and/or implementing its provisions in a timely manner.

4. Cost of Overhead and Support Services - The parties agree and understand that the obligation of the Fire Company shall be to pay the actual costs attributable to the

Overhead and Support Services being provided by the Township pursuant to this Agreement. The costs for the Overhead and Support Services described in this Agreement shall be based upon the actual cost of the program elements. In the case of staff support items which do not have separate costs attributable thereto, the Township shall estimate as carefully as possible the pro rata share of the total of such expenses attributable to the Paid Firefighters. The Township's personnel costs for providing Overhead and Support Services shall be determined by adding the number of hours that Township staff spent on providing these services multiplied by the respective staff member's hourly regular recharge rate, which includes both the employee's hourly salary and benefit costs. The invoices that the Township submits to the Fire Company for reimbursement for wages and Overhead and Support Services provided to the Fire Company shall be payable by the Fire Company in quarterly installments upon statements rendered by the Township. The Fire Company's pro-rata share of any insurance dividends that the Township receives from the Township's participation in a pooled insurance trust (such as DVIT) shall be deducted from the invoice. The Fire Company shall send to the Township the reimbursement for the fourth quarter of any calendar year no later than 2:00pm on December 31

5 \ so that the payment can be entered in the same calendar year that the expense was incurred.

3

5. Employees of Fire Company - Notwithstanding anything contained in this Agreement, the parties agree and understand that the Township shall provide Overhead and Support Services only for the Paid Firefighters and Other Paid Personnel who shall be and remain for all purposes employees of the Fire Company. The services being provided by the Township shall be deemed contracted-for services that are provided as an accommodation to the Fire Company in recognition of the benefits that the Fire Company provides to the residents of East Goshen Township and neighboring communities. The Fire Company is the employer of the Paid Firefighters and Other Paid Personnel.

6. No Managerial Control - Nothing in this Agreement shall be construed to give Township staff or elected officials any managerial control over the activities of the Paid Firefighters, Other Paid Personnel or the Fire Company.

7. General Indemnification - The Fire Company agrees to indemnify and hold harmless the Township from any and all claims which may be asserted against the Township as a result of the conduct of the Paid Firefighters, Other Paid Personnel and volunteers of the Fire Company in the performance of their official duties for the Fire Company. The Fire Company shall also cause the Township to be named an additional insured on its liability insurance policies as its interests may appear. The Fire Company further agrees to indemnify and hold harmless the Township from any and all claims which may be asserted against the Township as a result of a legal determination that any aspect of this Agreement violates federal, state or local laws or regulations. The Township agrees to indemnify and hold harmless the Fire Company from any and all claims which may be asserted against the Fire Company as a result of the performance by the Township of the services, obligations and tasks set forth in this Agreement.

8.

9. Miscellaneous Provisions.

A. Pennsylvania Law to Apply - This Agreement shall be construed under and in accordance with the laws of the Commonwealth of Pennsylvania, and all obligations of the parties created hereunder are performable in Chester County, Pennsylvania.

B. Assignment - This Agreement may not be assigned by either party without the consent of the other party.

C. Term - This Agreement shall have an initial term of one (1) year from the date of approval by the last party as indicated in the signature line hereinbelow and thereafter shall renew for successive one (1)-year terms unless terminated by either party giving written notice to the other at least ninety (90) days prior to the end of the initial or any renewal term.

D. Legal Construction - In the case of any one or more of the provisions contained m this Agreement shall for any reason be held to be invalid, illegal or

4

unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provision thereof, and this Agreement shall be construed as if such invalid, illegal or unenforceable provision had never been contained herein.

E. Prior Agreements Superseded - This Agreement constitutes the sole and only Agreement of the parties hereto and supersedes any prior understandings or written or oral agreements between the parties respecting the within subject matter, including the 1987 Agreement and Amendments.

IN WITNESS WHEREOF, the parties have executed this agreement the day and year first above written.

ATTEST:

Louis F. Smith, Jr., Secretary

ATTEST:

EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS

E. Martin Shane, Chairman

Carmen R. Battavio, Vice Chairman

Charles W. Proctor, III, Esquire, Member

Janet L. Emanuel, Member

Michael P. Lynch, Member

GOSHEN FIRE COMP ANY ~~~BY:·~

Name: «o hev T (). f6dl

Title: Pl/e.s1M

5

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 3/15/2018 To:

From: Re:

Board of Supervisors Mark Gordon, Township Zoning Officer Operation and Maintenance Agreements

Dear Board Members:

Daniel and Wendy Van Knippenberg, owners of 38 Meadow Creek Ln., are proposing to construct a swimming pool. The project requires Stormwater management and thus a SWM O&M Agreement.

I have the following Storm water management for the Board's approval.

Draft Motion: I move that we authorize the Chairman to execute the storm water management operation and maintenance agreement for 38 Meadow Creek ln.

F:\Data\Shared Data\Code Dept\Storm Water Managmeent O&M Agreements\2018\Memo to BOS 03152018.doc

1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, MARCH 6, 2018 5 DRAFT MINUTES 6 7 8 9 Present: Chairman Marty Shane; Vice Chairman Carmen Battavio; Supervisors 10 David Shuey, Janet Emanuel and Mike Lynch; Township Manager Rick Smith; 11 Finance Director Jon Altshul; Conservancy Board Chairman Erich Meyer. 12 13 Call to Order & Pledge of Allegiance 14 Marty called the meeting to order at 7:00 p.m. and led the pledge of allegiance. 15 16 Moment of Silence 17 Carmen called for a moment of silence to honor our troops and emergency 18 responders. 19 20 Recording 21 None. 22 23 Chairman's Report 24 Marty announced that the Board met in executive session immediately prior to 25 tonight's meeting to discuss a legal and real estate matter. He also announced that 26 John Scheidt had resigned from the Conservancy Board. 27 28 Goshen Fire Company Report 29 Carmen reported that the Goshen Fire Company responded to 13 fire calls, 213 30 ambulance calls and 7 fire police calls in East Goshen in January. 31 32 Consider Recommendation for Updated Continuing Disclosure Agreement 33 with DVRFA 34 Jon explained that due to changing federal rules on continuing disclosures for 35 municipal securities, the Township needed to update its continuing disclosure 36 agreements with the Delaware Valley Regional Finance Authority. Carmen made a 37 motion to authorize the Chairman to execute the updated Continuing Disclosure 38 Agreement for our outstanding loans with the Delaware Valley Regional Finance 39 Authority. Janet seconded. The motion passed 5-0. 40 41 Consider Recommendation to Close Out the New Kent II Escrow Account 42 Carmen made a motion to close out the Hankin Group's letter of credit put up as 43 escrow in the amount of $548,579.69 for New Kent IL Mike seconded. The motion 44 passed 5-0. 45 46 Consider Recommendation Concerning PA PUC Regulations

3/6/18 March 6, 2018 1

1 Rick explained that the PA Public Utility Commission (PUC) allows any interested 2 party to petition the PUC for the issuance, amendment, repeal or waiver of 3 regulations and suggested that he be permitted to work with the Township Solicitor 4 and Engineer to come back with a proposal for the Board. Marty stated that this 5 option may be an effective alternative to appealing to state elected officials for 6 changes to pipeline regulations. He also noted that this issue would be discussed 7 next Tuesday at the CCATO Spring Conference. Both Mike and David noted that this 8 process is likely to be extended and thorough, but that they also support pursuing it. 9 Mike added that the Township needs to be realistic about the types of regulatory 10 changes that it could achieve and encouraged the Board to look at the "gestalt" or 11 big picture. Janet made a motion to authorize Rick to work with the Township 12 Solicitor and Engineer to prepare petitions for the PUC for the Board's future 13 consideration. David seconded. The motion passed 5-0. 14 15 Consider Storm Water Maintenance Agreement and In-Law Suite for 315 16 Franklin Court 17 Carmen made a motion to authorize the Chairman to execute the Storm Water 18 Management and In-Law Suite Agreements for 315 Franklin Court. Janet seconded 19 the motion. Carmen asked Rick if the property owner understood that the property 20 could not be rented out to a new tenant if there were to be a change in 21 circumstances, and Rick indicated that they did. The motion passed 5-0. 22 23 Consider Recommendation for Paoli Pike Trail Easements 24 Rick explained that in order to proceed in obtaining easements along Segments C, D 25 & E of the trail, we would need have a facts and data book prepared and get a waiver 26 valuation performed for each affected parcel, pursuant to PENNDOT requirements. 27 Rick stated that PennDOT had recommended that we use Appraisal Review 28 Specialists to perform this work Janet made a motion to accept the proposal from 29 Appraisal Review Specialists to prepare a facts and data book for a cost of $4,500 30 and prepare waiver valuations as needed for a cost of $800 each. David seconded 31 the motion. The motion passed 5-0. 32 33 Any Other Matter 34 David made a motion to appoint Kathleen Lynch to the Historical Commission. Janet 35 seconded the motion. The motion passed 4-0, with Mike abstaining as Ms. Lynch is 36 his sister. 37 38 Approval of Minutes of February 27. 2018 39 Janet made a motion to approve the minutes of February 27, 2018, as corrected. 40 Carmen seconded. The motion passed 5-0 41 42 Treasurer's Report of March 1. 2018 43 Carmen moved to graciously accept the Treasurer's Report and the Expenditure 44 Register Report as recommended by the Treasurer, to accept the receipts and to 45 authorize payment of the invoices just reviewed. David seconded. The motion 46 passed 5-0.

3/6/18 March 6, 2018 2

1 2 Correspondence. Reports of Interest 3 The Board acknowledged the following correspondence and reports of interest: 4 • February 15, 2018 Letter from Governor Wolf regarding HB 1620 5 • 2017 Financial Statements for the Non-Uniformed Defined Contribution 6 Pension Plan, Frozen Non-Uniformed Defined Benefit Plan and Firefighters 7 Defined Benefit Plan. 8 9 Carmen observed that the Governor's letter did not indicate whether he supported 10 our position or not and asked Rick to follow up with another letter to the Governor 11 for clarification. 12 13 Liaison Reports 14 Mike stated that he, David, Rick and Mark Miller had had a productive meeting about 15 the ponds. He noted that Public Works can likely perform much of the work in 16 house. He also stated that he did a walk-through of the Malvern Institute last week. 17 He observed that the facility is in need of renovations, whether as proposed in the 18 variance application or not. Carmen added that he's concerned about an adjacent 19 parcel, also owned by the Malvern Institute, that may be an ideal "drop off' spot for 20 contraband and suggested that there be 24/7 monitoring of that location. 21 22 Adjournment 23 There being no further business, Janet motioned to adjourn the meeting at 8:00 pm. 24 Carmen seconded the motion. The motion passed 5-0. 25 26 Respectfully submitted, 27 ]on Altshul 28 Recording Secretary 29 30 Attachments: March 1, 2018 Treasurer's Report 31

3/6/18 March 6, 2018 3

March 1, 2018

TREASURER'S REPORT

2018 RECEIPTS AND BILLS

!GENERAL FUND

Real Estate Tax $168,336.96 Accounts Payable $463,085.22 Earned Income Tax $96,300.00 Electronic Pmts: Local Service Tax $2,700.00 Credit Card $0.00 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $0.00 Debt Service $0.00 Total Other Revenue $88,273.46 Payroll $119,264.19 Total Receipts: $355,610.42 Total Expenditures: $582,349.41

!STATE LIQUID FUELS FUND

Receipts $2,320.00 Interest Earned $0.00 Total State Liqud Fuels: $2,320.00 Expenditures: $0.00

!SINKING FUND

Receipts $0.00 Accounts Payable $83,900.50 Interest Earned $0.00 Credit Card $0.00 Total Sinking Fund: $0.00 Total Expenditures: $83,900.50

!TRANSPORTATION FUND

Receipts $0.00 Interest Earned $0.00 Total Sinking Fund: $0.00 Expenditures: $0.00

!SEWER OPERATING FUND

Accounts Payable $21,920.23 Receipts $281, 115.33 Debt Service $0.00 Interest Earned $0.00 Credit Card $0.00 Total Sewer: $281, 115.33 Total Expenditures: $21,920.23

!REFUSE FUND

Receipts $93,742.95 Interest Earned $0.00 Total Refuse: $93,742.95 Expenditures: $7,652.55

!BOND FUND

Receipts $0.00 Interest Earned $0.00 Total Sewer Sinking Fund: $0.00 Expenditures: $0.00

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $0.00 Total Sewer Sinking Fund: $0.00 Expenditures: $0.00

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $0.00 1 Total Operating Reserve Fund: $0.00 Expenditures: $0.00

3/6/18 March 6, 2018 4

March 15, 2018

TREASURER'S REPORT 2018 RECEIPTS AND BILLS

!GENERAL FUND

Real Estate Tax $835,364.90 Accounts Payable $128,222.98 Earned Income Tax $235,334.70 Electronic Pmts: Local Service Tax $0.00 Credit Card $4,913.83 Transfer Tax $0.00 Postage $1,000.00 General Fund Interest Earned $3,557.19 Debt Service $9,460.82 Total Other Revenue $22,965.83 Payroll $127, 194.56 Total Receipts: $1,097 ,222.62 Total Expenditures: $270,792.19

jSTATE LIQUID FUELS FUND

Receipts $550,991.40 Interest Earned $0.56 Total State Liqud Fuels: $550,991.96 Expenditures: $0.00

jSINKING FUND

Receipts $0.00 Accounts Payable $4,649.89 Interest Earned $1,599.74 Credit Card $0.00 Total Sinking Fund: $1,599.74 Total Expenditures: $4,649.89

jTRANSPORTATION FUND

Receipts $0.00 Interest Earned $408.09 Total Sinking Fund: $408.09 Expenditures: $0.00

jSEWER OPERATING FUND

Accounts Payable $60,609.89 Receipts $59,678.61 DebtSeNice $28,240.59 Interest Earned $205.77 Credit Card $0.00 Total Sewer: $59,884.38 Total Expenditures: $88,850.48

jREFUSE FUND

Receipts $23,605.76 Interest Earned $318.98 Total Refuse: $23,924.74 Expenditures: $74,073.92

jBOND FUND

Receipts $0.00 Accounts Payable $125, 077. 08 Interest Earned $7,387.01 Credit Card $5,760.00 Total Sewer Sinking Fund: $7,387.01 Total Expenditures: $130,837.08

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $631.92 Total Sewer Sinking Fund: $631.92 Expenditures: $15.00

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $551.92 Total Operating Reserve Fund: $551.92 Expenditures: $15.00

TO:

FROM:

SUBJECT:

DATE:

EAST GOSHEN TOWNSHIP

MEMORANDUM

BOARD OF SUPERVISORS

BRIAN MCCOOL

PROPOSED PAYMENTS OF BILLS

03-15-2018

Please accept the attached Treasurer's Report and Expenditure Register Report for consideration by the Board of Supervisors. I recommend the Treasurer's Report and each register item be approved for payment.

General Fund expenses include $49,140 for health insurance. Real Estate Tax revenue is much higher than usual due to the discount due date approaching.

State Liquid Fuel Revenues reflect the 2018 allocation from the state that was received in early March.

Bond Fund expenses include $106, 145 for engineering costs for both the Milltown Dam and Hershey's Mill Dam, $13, 172 for engineering costs associated with Segment C of the Paoli Pike trail and $5,760 for basketball court expenses (credit card charge reimbursed general fund).

Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.

F :\Data \Shared Data\Finance Deot\ Treasurers' Reports \2018\03-15-2018\03-15-2018 Memo. docx

EAST GOSHEN TOWNSHIP

MONTHLY DEBT PAYMENT BREAKDOWN

March 25, 2018

GENERAL FUND:

Interest Principal Year of Loan Original Remaining Retirement

payment payment Issuance Description loan amount Principal Date

$7,589.19 $0 2003 Multi purpose $5,500,000 $2,113,000 2023

9 projects

$1,563.10 $0 1999 Apple brook $3,000,000 $462,000 2019

Park

$308.53 $0 2000 Spray $287,000 $89,000 2021

Irrigation

SEWER FUND:

Interest Principal Loan Original Remaining Retirement

payment payment Description loan amount Principal Date

$22,859.10 $0 2008 RCSTP $9,500,000 $6,927,000 2032

Expansion

$5,381.49 $0 2013 Diversion $2,500,000 $2,118,000 2033

Projects

U:\bmccool\2018\Journal Entries\Debt Service\2018- Debt Service Report for Treasurers Report.xlsx

East Goshen Township Fund Accounting

Report Date 03/08/18

MARP05 run by BARBARA 9 33 AM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

3955 BAYARD PRINTING GROUP 54327 1 01401 3420 NEWSLETTERS

BATCH 10F3

Expenditures Register

GL-1803-62224

Invoice Number Req Date Check Dte Recpt Dte Check#

030718 03/08/18 03/08/18 03/08/18 15034

PAGE

Amount

1,353.00 POSTAGE FOR SPRING 2018 NEWSLETTERS

FUND SUMMARY

Fund Bank Account Amount Description

01 01 1,353.00 GENERAL FUND

1,353.00

PERIOD SUMMARY

Period Amount

1803 1,353.00

1,353.00

1 Printed, totaling

1,353.00

1,353.00 1,353.00

1

~ip Fund Accounting

12 16 PM

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE

Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ---- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

GENERAL FUND

68 AMS APPLIED MICRO SYSTEMS LTD.

1657

82

102

119

54337 1 01401 3120 CONSULTING SERVICES FEBRUARY 2018 54337 2 01414 5001 ZONING IT CONSULTING FEBRUARY 2018 - GEO PLAN

AQUA PA 54338 1 01411 3630 HYDRANT & WATER SERVICE 000309987 0309987 1/31-2/28/18 HY6 54339 1 01411 3630 HYDRANT & WATER SERVICE 000310033 0310033 1/31-2/28/18 186 54339 2 01411 3631 HYDRANTS - RECHARGE EXPENSE 000310033 0310033 1/31-2/28/18 93 54340 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 000309801 0309801 1/23-2/23/18 BS

ASSOCIATED TRUCK PARTS 54344 1 01430 2330 VEHICLE MAINT AND REPAIR 12 CONTAINERS "TOTAL POWER"

B&D COMPUTER SOLUTIONS 54345 1 01401 3120 CONSULTING SERVICES FEBRUARY 2018

BEE.NET INTERNET SERVICES 54346 1 01401 3210 COMMUNICATION EXPENSE MARCH 2018 BEE-MAIL ACCTS.

1198 BRANDYWINE VALLEY SPCA 54347 1 01410 5400 S.P.C.A. CONTRACT STRAY PICK-UP - FEBRUARY 2018

64319

64319

030118 HY6

030118 279

030118 279

022718 BS

212503

00003159

20183011

11653

03/13/18 03/13/18 1,097.00

03/13/18 03/13/18 28.00

1,125.00

03/13/18 03/13/18 137.52

03/13/18 03/13/18 4,696.50

03/13/18 03/13/18 2,348.25

03/13/18 03/13/18 16.80

7,199.07

03/13/18 03/13/18 95.76

95.76

03/13/18 03/13/18 2,000.00

2,000.00

03/13/18 03/13/18 315.00

315.00

03/13/18 03/13/18 154.50

154.50

1

~hip Fund Accounting

'8

12 16 PM

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE

Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

BUCKLEY BRION MCGUIRE & MORRIS 54348 1 01404 3140 LEGAL - ADMIN 15441 03/13/18 03/13/18 1,737.89 LEGAL SERVICE 2/1/18 - 2/28/18 54348 2 01413 3140 LEGAL - TWP CODE 15441 03/13/18 03/13/18 331.50 LEGAL SERVICE 2/1/18 - 2/28/18 54348 3 01414 3110 LEGAL - CODES 15441 03/13/18 03/13/18 1,095.90 LEGAL SERVICE 2/1/18 - 2/28/18 54348 4 01414 3141 LEGAL - ZONING HEARING BOARD 15441 03/13/18 03/13/18 2,018.25 LEGAL SERVICE 2/1/18 - 2/28/18

5,183.54

233 CCATO 54353 1 01401 3080 CCATO EXPENSES 2018-148 03/13/18 03/13/18 400.00 2018 MEMBERSHIP DUES

400.00

3956 CHESTER CNTY. DEPT.OF EMERGENCY SERVICES 54354 1 01411 3000 FIRE MARSHAL - EXPENSES 5507 03/13/18 03/13/18 30.00 HAZMAT TRAINING - CARMEN BATTAVIO

30.00

3488 CINTAS CORPORATION #287 54355 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287140213 03/13/18 03/13/18 119.24 WEEK END 3/7/18 CLEAN MATS 54355 2 01487 1910 UNIFORMS 287140213 03/13/18 03/13/18 391.39 WEEK END 3/7/18 CLEAN UNIFORMS 54356 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287136318 03/13/18 03/13/18 119 .24 WEEK END 2/28/18 CLEAN MATS 54356 2 01487 1910 UNIFORMS 287136318 03/13/18 03/13/18 391.39 WEEK END 2/28/18 CLEAN UNIFORMS

1,021.26

2996 CNS CLEANING COMPANY 54358 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 52097 03/13/18 03/13/18 870.00 JANITORIAL SERVICE - MARCH 2018 54358 2 01409 3840 DISTRICT COURT EXPENSES 52097 03/13/18 03/13/18 255.00 JANITORIAL SERVICE - MARCH 2018 ·----- --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3957 COLDWELL BANKER PREFERRED 54359 1 01362 4510 REOCCUPANCY PERMIT FEES-RESALES RETURN OF U&O FEE

030618

1,125.00

03/13/18 03/13/18 60.00

----- --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

60.00

2

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Expenditures Register

GL-1803-62303

BATCH 20F3

PAGE

Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

296 COMCAST 8499-10-109-0028306

3613

3872

54357 1 01401 3210 COMMUNICATION EXPENSE 0028306 MARCH 2018

DELAWARE VALLEY HEALTH TRUST 54360 1 01486 1560 HEALTH,ACCID. & LIFE MARCH 2018 PREMIUM - MEDICAL/RX 54360 2 01213 1000 DENTAL INSURANCE W/H MARCH 2018 PREMIUM - DENTAL

EAGLE TERMITE & PEST CONTROL 54361 1 01409 3840 DISTRICT COURT EXPENSES EXTERMINATOR SERVICE FEB.2018 - DC 54362 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS EXTERMINATOR SERVICE FEB.2018 - TWP 54365 1 01409 3745 PW BUILDING - MAINT REPAIRS EXTERMINATOR SERV. FEB.2018 -PW

1876 FOLEY INC. 54369 1 01432 3840 SNOW - EQUIPMENT RENTAL WHEEL LOADER & GP BUCKET RENTAL

1/17-2/14/18

2631 GRAPHIC IMPRESSIONS OF AMERICA INC.

022218

14309

14309

192746

192743

192745

W2587901

54375 1 01401 2110 STATIONERY 18-8812 DESIGN PLANNING COMM. LETTERHEAD & PROVIDE SAMPLES

638 HOME DEPOT CREDIT SERVICES 54376 1 01401 2100 MATERIALS & SUPPLIES 021318 PLYWOOD FOR SUE'S TABLE, LUMBER & SUPPLIES FOR PRINTER TABLES 54376 2 01409 3840 DISTRICT COURT EXPENSES 021318 NAME PLATES - DIST.CT. 54376 3 01437 2460 GENERAL EXPENSE - SHOP 021318 DECK SPRAY, SAW BLADES, PLASTIC WOOD, SAND PAPER & BRUSHES 54376 4 01454 3740 EQUIPMENT MAINT. & REPAIR 021318 HOOKS FOR PARK

03/13/18 03/13/18 114.90

114.90

03/13/18 03/13/18 49,140.36

03/13/18 03/13/18 1,345.00

50,485.36

03/13/18 03/13/18 50.00

03/13/18 03/13/18 105.00

03/13/18 03/13/18 45.00

200.00

03/13/18 03/13/18 4,411.00

4,411.00

03/13/18 03/13/18 50.00

50.00

03/13/18 03/13/18 116. 64

03/13/18 03/13/18 2.36

03/13/18 03/13/18 95.43

03/13/18 03/13/18 27.88

3

East Goshen Township Fund Accounting

Report Date 03/13/18

MARP05 run by BARBARA 12 16 PM

Vendor Req # Budget# Sub# Description

739

787

1817

1641

RNOX EQUIPMENT RENTALS INC. 54377 1 01430 2330 VEHICLE MAINT AND REPAIR INSTALL NEW COIL - HONDA EV2000 54378 1 01430 2330 VEHICLE MAINT AND REPAIR LOWER RUBBERS - HONDA EV2000

LOW-RISE ELEVATOR CO. INC 54379 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS BASIC MAINTENANCE - FEBRUARY 2018

LOWES BUSINESS ACCOUNT/GECF 54380 1 01430 2330 VEHICLE MAINT AND REPAIR LUMBER - REDECK TILT TRAILER 54380 2 01432 2500 SNOW - MAINTENANCE & REPAIRS EMBOSSED PVC - BRINE ROOM OPENING

NAPA AUTO PARTS 54381 1 01430 2330 VEHICLE MAINT AND REPAIR

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

242.31

35971 03/13/18 03/13/18 181.30

021518 03/13/18 03/13/18 45.61

226.91

74784 03/13/18 03/13/18 40.00

40.00

021718 03/13/18 03/13/18 155.26

021718 03/13/18 03/13/18 113.49

268.75

2-727205 03/13/18 03/13/18 263. 65 SPARK PLUGS, OIL, OIL & AIR FILTERS & BATTERY 54381 2 01430 2330 VEHICLE MAINT AND REPAIR 2-727206 03/13/18 03/13/18 482.49 NOTCHED HI-LIFT & SPARK PLUGS

746.14

3679 NETCARRIER TELECOM INC. 67846 54386 1 01401 3210 COMMUNICATION EXPENSE 503941 03/13/18 03/13/18 362.94 3/1/18 - 3/31/18 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

362.94

3680 NETCARRIER TELECOM INC. 67891 54387 1 01401 3210 COMMUNICATION EXPENSE 503948 03/13/18 03/13/18 134.63 3/1/18 - 3/31/18 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

134.63

4

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Expenditures Register

GL-1803-62303

BATCH 2 OF 3

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2352

3153

1555

PECO - 99193-01400 54390 1 01434 3610 STREET LIGHTING 99193-01400 1/26/18 - 2/26/18 54390 2 01433 2470 UTILITIES - TRAFFIC LIGHTS 99193-01400 1/26/18 - 2/26/18

PECO - 01360-05046

030218

030218

54391 1 01409 7505 BOOT & PAOLI LED SIGN 030118 01360-05046 1/30 - 2/28/18 BOOT LED

PECO - 45168-01609 54389 1 01409 3840 DISTRICT COURT EXPENSES 022618 45168-01609 1/25/18 - 2/23/18 GAS 54389 2 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 022618 45168-01609 1/25/18 - 2/23/18 ELEC.

1005 PENNSYLVANIA ONE CALL SYSTEM 54392 1 01438 3840 EQUIPMENT RENTAL 0000760508 MONTHLY ACTIVITY - FEBRUARY 2018

1161 REILLY & SONS INC 54393 1 01430 2320 VEHICLE OPERATION - FUEL 139247 512.1 GALLONS DIESEL 54394 1 01430 2320 VEHICLE OPERATION - FUEL 139316 276.01 GALLONS GASOLINE 54395 1 01430 2320 VEHICLE OPERATION - FUEL 139555 865.5 GALLONS DIESEL 54396 1 01430 2320 VEHICLE OPERATION - FUEL 138501 290.3 GALLONS DIESEL

3731 RINEHART'S SANITATION SERVICES INC. 54397 1 01452 3204 COMMUNITY DAY 414-1175751 50% DEPOSIT - COMFORT STATIONS

03/13/18 03/13/18 704.10

03/13/18 03/13/18 571.07

1,275.17

03/13/18 03/13/18 70.38

70.38

03/13/18 03/13/18 1,487.63

03/13/18 03/13/18 811. 34

2,298.97

03/13/18 03/13/18 132.40

132.40

03/13/18 03/13/18 1,106.14

03/13/18 03/13/18 531.85

03/13/18 03/13/18 1,821.01

03/13/18 03/13/18 602.37

4,061.37

03/13/18 03/13/18 1,451.26

1, 451. 26

5

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

2108 SIDELINES SPORTSWEAR & PROMOTIONS

1324

2829

54399 l 01487 1910 UNIFORMS 5974 E.G. JACKET - BOS MEMBER

T&G WINDOW CLEANING 54400 l 01409 3840 DISTRICT COURT EXPENSES MARCH CLEANING D.C.

393988

03/13/18

03/13/18

VERIZON - TWP.FIOS 0001-74 54403 l 01401 3210 COMMUNICATION EXPENSE 2/28/18 - 3/27/18 FIOS - TWP 022718-0001-74 03/13/18

3959 WEBER GALLAGHER LLP 54406 1 01404 3140 LEGAL - ADMIN 462004 03/13/18 LEGAL SERVICE 8/16-9/7/18 EEOC

03/13/18 95.95

95.95

03/13/18 150.00

150.00

03/13/18 99.99

99.99

03/13/18 l,396.08

1,396.08

6

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARPOS run by BARBARA 12 16 PM

Vendor Req # Budget# Sub# Description

03 SINKING FUND

638 HOME DEPOT CREDIT SERVICES

1817

54376 5 03454 7450 CAPITAL PURCHASE - PARK & REC SIDING FOR PARK SHED AT TOT LOT

LOWES BUSINESS ACCOUNT/GECF 54380 3 03454 7450 CAPITAL PURCHASE - PARK & REC

Expenditures Register

GL-1803-62303

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

021318 03/13/18 03/13/18 42.98

42.98

021718 03/13/18 03/13/18 385.87 STUDS, CAULK & TREATED LUMBER- PARK SHED 54380 4 03454 7450 CAPITAL PURCHASE - PARK & REC 021718 03/13/18 03/13/18 -18.96 REFUND OF SALES TAX FOR ABOVE

366.91

7

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

05 SEWER OPERATING

1658 AQUA PA 54341 1 05420 3602 C.C. COLLECTION -UTILITIES 000309826 0309826 1/23-2/23/18 TH 54342 1 05420 3602 C.C. COLLECTION -UTILITIES 000305003 0305003 1/24-2/26/18 WW 54343 1 05422 3601 R.C. COLLEC.-UTILITIES 001533998 1087842 1/23-2/23/18 TWN

197 BUCKLEY BRION MCGUIRE & MORRIS 54349 1 05429 3140 ADMIN - LEGAL LEGAL SERVICE 2/1/18 - 2/28/18

241 C.C. SOLID WASTE AUTHORITY

3872

1876

54351 2 05422 4502 R.C. SLUDGE-LAND CHESTER WEEK 2/16/18 - 2/22/18

EAGLE TERMITE & PEST CONTROL 54363 1 05422 3700 R.C. STP-MAINT.& REPAIRS EXTERMINATOR SERV. FEB.2018 -RCSTP 54364 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. EXTERMINATOR SERV. FEB.2018 -ASHBRG

FOLEY INC. 54367 1 05420 3704 C.C. COLLECT.-MAINT & REP - I&I SWING BOOM,BUCKETS & COUPLER RENTAL 1/24/18 - 2/21/18 54368 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. CREDIT ON ACCT. PER STATEMENT

638 HOME DEPOT CREDIT SERVICES

022718 TH

022818 WW

022718 TWN

15537

49881

192744

192747

W2582001

AR A 866

54376 6 05420 3702 C.C. COLLEC.-MAINT.& REPR. 021318 SIDING, MOULDING/LATTICE & ALE PLUS CLEAR - BARKWAY PS

03/13/18 03/13/18 29.40

03/13/18 03/13/18 28.88

03/13/18 03/13/18 59.54

117.82

03/13/18 03/13/18 2,382.73

2,382.73

03/13/18 03/13/18 485.75

485.75

03/13/18 03/13/18 45.00

03/13/18 03/13/18 25.00

70.00

03/13/18 03/13/18 4,174.00

03/13/18 03/13/18 -612.50

3,561.50

03/13/18 03/13/18 327.98

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

327.98

8

East Goshen Township Fund Accounting

Report Dqte 03/13/18

MARP05 run by BARBARA 12 16 PM

Vendor Req # Budget# Sub# Description

1817 LOWES BUSINESS ACCOUNT/GECF 54380 5 05420 3702 C.C. COLLEC.-MAINT.& REPR.

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

021718 03/13/18 03/13/18 186.32 REPLACEMENT GROUND PADS - SEWER JOB

3675 NETCARRIER TELECOM INC. 67889 54382 1 05420 3602 C.C. COLLECTION -UTILITIES 3/1/18 - 3/31/18

3676 NETCARRIER TELECOM INC. 67890

3677

3678

3725

54383 1 05422 3600 R.C STP -UTILITIES 3/1/18 - 3/31/18

NETCARRIER TELECOM INC. 67887 54384 1 05420 3602 C.C. COLLECTION -UTILITIES 3/1/18 - 3/31/18

NETCARRIER TELECOM INC. 67888 54385 1 05420 3602 C.C. COLLECTION -UTILITIES 3/1/18 - 3/31/18

NETCARRIER TELECOM INC. 68255 54388 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 3/1/18 - 3/31/18

2914 TOWLER, SCOTT A. 54401 1 05422 4500 R.C. STP-CONTRACTED SERV. SERVICES RE: RCSTP JANUARY 2018 54402 1 05422 4500 R.C. STP-CONTRACTED SERV. SERVICES RE: RCSTP FEBRUARY 2018

503946

503947

503944

503945

504138

18-010131-1

18-020128-1

186.32

03/13/18 03/13/18 49.23

49.23

03/13/18 03/13/18 48.87

48.87

03/13/18 03/13/18 49.12

49.12

03/13/18 03/13/18 48.98

48.98

03/13/18 03/13/18 50.01

50.01

03/13/18 03/13/18 14,500.09

03/13/18 03/13/18 13,235.39

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3529 VERIZON - MODEMS 54405 1 05420 3601 C.C. INTERCEPTOR-UTILITIES 1/26/18 - 2/25/18 MODEMS 9802374160

27,735.48

03/13/18 03/13/18 102.41

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

102.41

9

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Vendor Req # Budget# Sub# Description

05 SEWER OPERATING

2773 VERIZON - PW FIOS 0001-15 54404 1 05422 3601 R.C. COLLEC.-UTILITIES 2/28/18 - 3/27/18 FIOS - PW

Expenditures Register

GL-1803-62303

BATCH 2 OF 3

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

022718-0001-15 03/13/18 03/13/18 89.99

89.99

10

East Goshen Township Fund Accounting

Report D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Vendor Req # Budget# Sub# Description

06 REFUSE

2762 AJB A.J. BLOSENSKI INC. 54336 1 06427 4500 CONTRACTED SERV. RESIDENTIAL PICK-UP MARCH 2018

197 BUCKLEY BRION MCGUIRE & MORRIS 54349 2 06427 3140 LEGAL SERVICES LEGAL SERVICE 2/1/18 - 2/28/18

241 C.C. SOLID WASTE AUTHORITY 54350 1 06427 4502 LANDFILL FEES WEEK 2/23/18 - 2/27/18 54351 1 06427 4502 LANDFILL FEES WEEK 2/16/18 - 2/22/18 54352 1 06427 4502 LANDFILL FEES WEEK 3/01/18 - 3/06/18

3958 SCHIEBER III, JOSEPH 54398 1 06364 2000 REVENUE - REFUSE FEES REFUND OF CREDIT BALANCE

Expenditures Register

GL-1803-62303

BATCH 2 OF3

PAGE 11

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

83105279 03/13/18 03/13/18 57,910.03

57,910.03

15537 03/13/18 03/13/18 2,382.72

2,382. 72

49949 03/13/18 03/13/18 3,044.79

49881 03/13/18 03/13/18 5,284.41

50008 03/13/18 03/13/18 4,105.71

12,434.91

022818 03/13/18 03/13/18 214.04

214.04

East Goshen Township Fund Accounting

Reportc D~te 03/13/18

MARP05 run by BARBARA 12 16 PM

Expenditures Register

GL-1803-62303

BATCH 2 OF 3

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

OB BOND FUNDS (CAPITAL PROJECTS)

425 EAST GOSHEN TOWNSHIP - GENERAL

1970

54366 1 08454 6008 FIELD IMPROVEMENTS

54371 1

54372 1

54373 1

54374 1

REIMBURSE 01 FUND FOR CREDIT CARD CARD EXPENSE - BASKETBALL HOOPS & RIMS

GANNETT FLEMING COMPANIES 08454 6050 HERSHEY'S MILL ENGINEERING ENGINEERING SERV. 9/30/17-2/2/18 HERSHEY MILL DAM ENH1\NCMT. 08454 6010 MILLTOWN DAM ENGINEERING ENGINEERING SERV. 9/30/17-2/2/18 MILLTOWN DAM - HAZARD REDUCTION 08454 6010 MILLTOWN DAM ENGINEERING ENGINEERING SERV. 9/30/17-2/2/18 MILLTOWN DAM - RED BELLY TURTLE 08454 6010 MILLTOWN DAM ENGINEERING ENGINEERING SERV. 9/30/17-2/2/18 MILLTOWN DAM - RESERVOIR ENH1\NCMTS

FUND SUMMARY

Fund Bank Account Amount Description

01 01 03 03 05 05 06 06 08 08

87,023.64 GENERAL FUND 409.89 SINKING FUND 35,306.19 SEWER OPERATING 72,941.70 REFUSE 111,905.00 BOND FUNDS (CAPITAL PROJECTS)

307,586.42

PERIOD SUMMARY

Period Amount

1803 307,586.42

307,586.42

030618 03/13/18

060466.12*50510 03/13/18

060466.06*50507 03/13/18

060466.10*50508 03/13/18

060466.11*50509 03/13/18

03/13/18 5,760.00

5,760.00

03/13/18 68,365.00

03/13/18 4,670.00

03/13/18 5,600.00

03/13/18 27,510.00

106,145.00

307,586.42 0 Printed, totaling 307,586.42

12

East Goshen Township Fund Accounting

R~port Da~e 03/15/18

MARP05 run by BARBARA 3 27 PM

Expenditures Register

GL-1803-62327

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

3140 ACE PORTABLES INC.

2762

54419 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS PORTABLE TOILETS 3/8-3/31/18

AJB A.J. BLOSENSKI INC. 54422 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 30 YD ROLLOFF HAULING FEE

1903 ALTHOUSE, GARY

2690

1703

3249

54423 1 01401 3000 GENERAL EXPENSE REIMBURSEMENT FOR TOLLS - PENNBOC MTG. 3/8/18

ASFPM 54424 1 01413 3000 GENERAL EXPENSE 2018 MEMBERSHIP DUES - M.GORDON

BATTAVIO, CARMEN 54426 1 01401 3000 GENERAL EXPENSE REIMBURSEMENT FOR LUNCH - ADELPHIA EASEMENT MEETING 54426 2 01401 3300 AUTO ALLOWANCE MILEAGE ADELPHIA MTG. 32 MILES @

$.545

COMCAST 8499-10-109-0107712

131165

82M00739

030818

031418

031218

031218

54429 1 01401 3210 COMMUNICATION EXPENSE 030418 0107712 3/5-4/4/18 E.G. PARK LED

3490 COMCAST 8499-10-109-0111284 54428 1 01401 3210 COMMUNICATION EXPENSE 030418 0111284 3/9-4/8/18 PW SPEC.VIDEO

03/15/18 03/15/18 109.93

109.93

03/15/18 03/15/18 400.00

400.00

03/15/18 03/15/18 5.20

5.20

03/15/18 03/15/18 160.00

160.00

03/15/18 03/15/18 37.56

03/15/18 03/15/18 17.44

55.00

03/15/18 03/15/18 105.75

105.75

03/15/18 03/15/18 16.88

16.88

1

East Goshen Township Fund Accounting

R~port Da~e 03/15/18

MARP05 run by BARBARA 3 : 27 PM

Expenditures Register

GL-1803-62327

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

317 CONTRACTOR'S CHOICE 54431 1 01430 2330 VEHICLE MAINT AND REPAIR INSTALL NEW PARTS - 0 RINGS

320 CONWAY POWER EQUIPMENT

594

2717

54432 1 01430 2330 VEHICLE MAINT AND REPAIR CARRY BARRELS

HAMMOND & MCCLOSKEY INC. 54433 1 01409 3745 PW BUILDING - MAINT REPAIRS INSTALL NEW BACKFLOW PREVENTER -PW

HIGGINS & SONS INC., CHARLES A. 54434 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT REPAIR - GREENHILL & N. CHESTER 54435 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT REPAIR - RT.352 & MANLEY

719 KEEN COMPRESSED GAS COMPANY 54436 1 01437 2460 GENERAL EXPENSE - SHOP VARIOUS CYLINDERS OF GASES

2442 KENT AUTOMOTIVE 54437 1 01430 2330 VEHICLE MAINT AND REPAIR BATTERY CABLE LUG ASSORTMENT

2813 LAYFIELD, RUBY 54438 1 01452 3711 PILATES PILATE INSTRUCTION SESSION 2 WINTER

00220870

42645

8586

46433

46417

83172417

9305626497

031418

03/15/18 03/15/18 40.60

40.60

03/15/18 03/15/18 259.96

259.96

03/15/18 03/15/18 1f581. 92

1,581.92

03/15/18 03/15/18 1,562.10

03/15/18 03/15/18 246.76

1,808.86

03/15/18 03/15/18 65.36

65.36

03/15/18 03/15/18 172. 28

172.28

03/15/18 03/15/18 195.50

195.50

2

East Goshen Township Fund Accounting

R~port Da~e 03/15/18

MARP05 run by BARBARA 3 27 PM

Expenditures Register

GL-1803-62327

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

800 MACANGA INC. 54442 3 01438 3840 EQUIPMENT RENTAL 030918 TRACKHOE, TRUCKS & DUMP 12 LOADS

3961 MCHALE, JENNIFER 54439 1 01432 2500 SNOW - MAINTENANCE & REPAIRS REIMBURSEMENT FOR DAMAGED MAILBOX

3551 MCMAHON ASSOCIATES INC.

011718

54441 1 01414 3050 ZONING CONSULTANTS 157536 PROF.SERVICE 1/1-2/2/18 PAOLI PK TRAIL GRANT ASSISTANCE

864 METROPOLITAN COMMUNICATIO 54443 1 01432 2500 SNOW - MAINTENANCE & REPAIRS MPBB - LIGHT 54444 1 01430 2330 VEHICLE MAINT AND REPAIR INSTALL AMBER LEDS 2012 F350

36 MYERS INC. I ALLAN A. 54446 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 3.02 TONS 25mm 64-22 ESAL

3269 NATIONAL STORMWATER CENTER

IN000106990

IN000106798

30-00129191

031418

03/15/18

03/15/18

03/15/18

03/15/18

03/15/18

03/15/18

03/15/18 54447 1 01487 4600 TRAINING & SEMINARS-EMPLY STORMWATER CLASSES - KEVIN MILLER, EDW.KILGORE & MIKE HOLMES ')_ - ~ t>, ~; \ R. A , .-1 I ,.J fr

827 NEW ENTERPRISE STONE & LIME INC. 54448 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 145.91 TONS STONE, 2A 6770701 03/15/18

03/15/18 1,565. 71

1, 565. 71

03/15/18 25.00

25.00

03/15/18 80.00

80.00

03/15/18 300.00

03/15/18 1,675.00

1,975 .00

03/15/18 129.86

129.86

03/15/18 2,322.00

2,322.00

03/15/18 2,473.18

2,473 .18

3

East Goshen Township Fund Accounting

R~port Da~e 03/15/18

MARP05 run by BARBARA 3 27 PM

Expenditures Register

GL-1803-62327

BATCH3 OF3

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1554 OFFICE DEPOT 54449 l 01401 2100 MATERIALS & SUPPLIES 112428604001 03/15/18 03/15/18 42.ll MONEY/RECEIPT BOOKS, OFFICE DUSTER, TAPE & GLUE

42 .ll

2591 PECO - 59500-35010 54450 l 01454 3600 UTILITIES 030518 03/15/18 03/15/18 23.84 59500-35010 1/25-2/28/18 POND PUMP

23.84

1032 PECO - 99193-01302 54451 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 030818 03/15/18 03/15/18 2,769.42 99193-01302 l/26-2/26/18 54451 2 01454 3600 UTILITIES 030818 03/15/18 03/15/18 263.21 99193-01302 l/26-2/26/18

3,032.63

1785 PENNSYLVANIA STATE POLICE 54453 l 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 R19327539 BACKGROUND CK. - FREDA 54453 2 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 R19327645 BACKGRND.CHK.- WILLIAMSON 54453 3 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 R193277ll BACKGROUND CK.-MONTGOMERY 54453 4 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 R19327808 BACKGROUND CK.- INSKEEP 54453 5 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 Rl9411976 BACKGROUND CK.- VILLARIN! 54453 6 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 Rl9438494 BACKGROUND CK.- KAYSER 54453 7 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 Rl9438581 BACKGROUND CK.- DUFFY 54453 8 01401 3000 GENERAL EXPENSE 030218 03/15/18 03/15/18 22.00 Rl9438716 BACKGROUND CK.- DOUGHERTY ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

176.00

3960 PLEVYAK, ARLENE 54459 1 01367 3601 MISCELLANEOUS EVENTS 821201 03/15/18 03/15/18 172.50 REFUND RE: CANCELED SCULPTURE CLASS ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

172.50

4

East Goshen Township Fund Accounting

Report Dat~ 03/15/18

MARP05 run by BARBARA 3 27 PM

Expenditures Register

GL-1803-62327

BATCH 3 OF3

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

2539 PRECISION MECHANICAL SERVICES 54460 1 01409 3745 PW BUILDING - MAINT REPAIRS REPLACE THERMOSTAT - PW GARAGE

SC-16310

3868 REGENT HYDRAULIC & MACHINE WORKS INC. 54461 1 01430 2330 VEHICLE MAINT AND REPAIR 181712 CAMERA CABLE

1196 S&S WORLDWIDE INC

1783

1342

1389

1470

54466 1 01452 2000 SUMMER PROGRAM SUPPLIES 031418 CRAFT & SUPPLIES FOR SUMMER CAMP

STATE WORKERS INSURANCE FUND 54467 1 01411 6000 VOLUNTEER FIREFIGHTER WORKERS COMP 030118 INSTALLMT. 4 OF 11 POL.#05918452

TMACC 54468 1 01413 3000 GENERAL EXPENSE SPRING MEETING - M. GORDON

UNRUH TURNER BURKE FREES 54469 1 01414 3141 LEGAL - ZONING HEARING BOARD LEGAL SERV. 12/6-2/6/18 GASPER

WESTTOWN TOWNSHIP 54470 1 01410 5310 REGIONAL POLICE BLDG INTEREST MARCH 2018 - INTEREST 54470 2 01410 5320 REGIONAL POLICE BLDG PRINCIPAL MARCH 2018 - PRINCIPAL

031418

153315

033118

033118

03/15/18 03/15/18 127.59

127.59

03/15/18 03/15/18 3,034.85

3,034.85

03/15/18 03/15/18 942.62

942.62

03/15/18 03/15/18 5, 779.00

5,779.00

03/15/18 03/15/18 35.00

35.00

03/15/18 03/15/18 1,925.45

1,925.45

03/15/18 03/15/18 1,105.63

03/15/18 03/15/18 9,583.33

10,688.96

5

East Goshen Township Fund Accounting

R~port Date 03/15/18

MARP05 run by BARBARA 3 27 PM

Expenditures Register

GL-1803-62327

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

03 SINKING FUND

3962 MOON NURSERIES 54445 l 03454 7450 CAPITAL PURCHASE - PARK & REC SIX RED MAPLES & ONE WEEPING WILLOW TREES - PLAYGROUND

S000059466 03/15/18 03/15/18 4,200.00

4,200.00

6

East Goshen Township Fund Accounting

BATCH 3 OF 3

Report Date 03/15/18   Expenditures Register GL-1803-62327   PAGE 7

MARP05 run by BARBARA   3 : 27 PM

VendorReq #Budget# Sub#DescriptionInvoice NumberReq DateCheck DteRecpt DteCheck#Amount
05 SEWER OPERATING
3140ACE PORTABLES INC.
54420 105422 3701R.C. COLLEC.-MAINT.& REPR PORTABLE TOILETS 2/6-2/27/1813034403/15/1803/15/18250.00
Vendor total250.00
2918ALS ENVIRONMENTAL
54412 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 12/12/1840-222283503/15/1803/15/18120.00
54413 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 12/28/17-1/5/1840-222445203/15/1803/15/18408.00
54414 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 1/12/1840-222593803/15/1803/15/186.00
54415 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 1/09/18-1/23/1840-222852603/15/1803/15/18321.00
54416 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 1/30/1840-223053803/15/1803/15/1818.00
54417 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 1/30 - 2/9/1840-223249003/15/1803/15/18349.00
54418 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 2/13/1840-223533803/15/1803/15/1812.00
54421 105422 4500R.C. STP-CONTRACTED SERV. LAB TESTING RCSTP 1/23-1/29/1840-222943703/15/1803/15/18180.00
Vendor total1,414.00
3598CEDAR HOLLOW RECYCLING
54427 105420 3702C.C. COLLEC.-MAINT.& REPR. BLACKTOP, MIXED MATER & DIRT0001329603/15/1803/15/182,387.37
54427 205420 3704C.C. COLLECT.-MAINT & REP - I&I BLACKTOP, MIXED MATER & DIRT0001329603/15/1803/15/182,387.37
Vendor total4,774.74
2960COMMONWEALTH OF PENNSYLVANIA
54430 105422 3700R.C. STP-MAINT.& REPAIRS ANNUAL FEE- NPDES PERMITS/CHAP. 92A104379803/15/1803/15/18500.00
Vendor total500.00
800MACANGA INC.
54442 105420 3702C.C. COLLEC.-MAINT.& REPR. TRACKHOE, TRUCKS & DUMP 20 LOADS03091803/15/1803/15/182,609.53
54442 205422 3701R.C. COLLEC.-MAINT.& REPR TRACKHOE, TRUCKS & DUMP 10 LOADS03091803/15/1803/15/181,304.76
Vendor total3,914.29

East Goshen Township Fund Accounting

R~port Date 03/15/18

MARP05 run by BARBARA 3 : 27 PM

Expenditures Register

GL-1803-62327

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

05 SEWER OPERATING

1031 PECO - 99193-01204 54452 1 05420 3602 C.C. COLLECTION -UTILITIES 030818 03/15/18 03/15/18 917.48 99193-01204 1/26-3/1/18 54452 2 05420 3600 C.C. METERS - UTILITIES 030818 03/15/18 03/15/18 9.06 99193-01204 1/26-3/1/18 54452 3 05422 3601 R.C. COLLEC.-UTILITIES 030818 03/15/18 03/15/18 373.07 99193-01204 1/26-3/1/18 54452 4 05422 3600 R.C STP -UTILITIES 030818 03/15/18 03/15/18 10,017.94 99193-01204 1/26-3/1/18

11,317.55

1083 PIPE LINE PLASTICS INC. 54454 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 304585 03/15/18 03/15/18 73.55 411 PVC THREADER PLUGS 54455 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 304611 03/15/18 03/15/18 233.22 4" PVC THREADER PLUGS, COUPLING, FEMALE ADAPTERS & VENT CAPS

306. 77

1087 PIPE XPRESS INC. 54456 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 90071 03/15/18 03/15/18 376.39 PVC PIPE, ADAPTERS, CEMENT, PRIMER, COUPLINGS, ADAPTERS & PLUG THREADS 54457 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 90141 03/15/18 03/15/18 342.60 FEMALE ADAPTERS & PLUG THREADS 54458 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 90045 03/15/18 03/15/18 55.60 DBL WALL CORR PIPING

774.59

1161 REILLY & SONS INC 54462 1 05422 3700 R.C. STP-MAINT.& REPAIRS 139574 03/15/18 03/15/18 71.98 24.0 GALLONS DIESEL - HUNT CNTRY. 54463 1 05422 3700 R.C. STP-MAINT.& REPAIRS 139573 03/15/18 03/15/18 1,244.59 415.0 GALLONS DIESEL - RCSTP 54464 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 139572 03/15/18 03/15/18 244.72 81.6 GALLONS DIESEL - MANLEY 54465 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 139571 03/15/18 03/15/18 92.97 31.0 GALLONS DIESEL - BARKWAY

1,654.26

8

East Goshen Township Fund Accounting

Report Date 03/15/18

MARP05 run by BARBARA 3 27 PM

Vendor Req # Budget# Sub# Description

06 REFUSE

138 BFI-KING OF PRUSSIA RECYCLERY 54425 1 06427 4504 RECYCLING FEES RECYCLING FEES - FEBRUARY 2018

Expenditures Register

GL-1803-62327

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

4586-000057088 03/15/18 03/15/18 759. 72

759.72

9

East Goshen Township Fund Accounting

Report Date 03/15/18

MARP05 run by BARBARA 3 27 PM

Expenditures Register

GL-1803-62327

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

08 BOND FUNDS (CAPITAL PROJECTS)

3551 MCMAHON ASSOCIATES INC. 54440 1 08459 6003 SEGMENT C ENGINEERING 157708 PROF.SERVICE 1/1-2/2/18 PAOLI PK TRAIL SEGMENT C

FUND SUMMARY

Fund Bank Account Amount Description

01 01 03 03 05 05 06 06 08 08

39,528.54 GENERAL FUND 4,200.00 SINKING FUND 24,906.20 SEWER OPERATING 759.72 REFUSE 13,172.08 BOND FUNDS (CAPITAL PROJECTS)

82,566.54

PERIOD SUMMARY

Period Amount

1803 82,566.54

82,566.54

03/15/18 03/15/18 13,172.08

13,172.08

82,566.54 0 Printed, totaling 82,566.54

10

A7TACHMENT1 OF2 Meeting Date 3/20/2018

DAT~

RICK SMITH

12/27/2017 WP E~GINE- JANUARY 2018 29.00 29.00

1/17/2018 PSATS - CONFERENCE- ~ 1,200.00 1,200.00

1/22/2018 PEPPER MILL - LUNCH MTG. RE: POLICE 50.19 50.19

1/25/2018 SEPTA- MALVERN- EEOC HEARING 27.00 27.00 '

$1,306.19 ....

MARK MILLER

1/6/2018 GIANT - Refreshments - Goals Mtg. 78.84 78.84

1/15/2018 RED WING SHOES - Shoes & socks 184.58 184.58

1/16/2018 WORKBOOTS.COM - Workboots 2,505.95 2,505.95

1/19/2018 SUMMIT SIGN & SAFETY - Safety Vests & Raingear 211.60 211.60

1/22/2018 OVERSTOCK.COM Linens & bed wear for bunk room 292.79 292.79

1/23/2018 AT&TDATA-S. Walker 30.00 30.00

1/24/2018 BASKETBALL HOOPS- Basketball backboards & rims 5,760.00 5,760.00

1/24/2018 HONEYBROOK HARDWARE-Stihl Parts 33.88 33.88

$9,097.64

·JASON LANG

1/2/2018 NATIONAL RECREATION - Membership dues 170.00 170.00

1/8/2018 ARNOLD'S FAMILY FUN - Deposit Summer Camp trip 100.00 100.00

$270.00

GRAND TOTAL 10,673.83 156.03 1,200;00 59.00 326.67 100.00. 170.00 2,902.13 5,760.00 10,673.83

J/E's made x

Add to Master Cred.Card List x

ACH DEBITS TO GENERAL FUNDS EXPENSE REPORT Attachment 2 of 2

Meeting Date

3/20/2018

2/16-3/15/18

01 Amount TRX# Charged Date Name Description

62188 1 95.00 3/6/2018 REIMBURSE S/R FOR BANK FEES POSITIVE PAY & ACH MONITOR FEES

62195 1 29.90 3/6/2018 CREDIT CARD FEES - AUTHNET CREDIT CARD FEES - AUTHNET

62196 1 112.90 3/6/2018 CREDIT CARD FEES - BANKCARD CREDIT CARD FEES - BANKCARD

62201 1 80.00 3/6/2018 PRIMEPAY - FEBRUARY 2018 MISC. EMPLOYEE BENEFITS 317.80 03 TRX#

62189 1 40.00 3/6/2018 REIMBURSE S/R FOR BANK FEES POSITIVE PAY & ACH MONITOR FEES 40.00 05 TRX#

62190 1 350.00 3/6/2018 REIMBURSE S/R FOR BANK FEES LOCK BOX FEE

62190 2 47.50 3/6/2018 REIMBURSE S/R FOR BANK FEES POSITIVE PAY & ACH MONITOR FEES 397.50 06 TRX#

62191 1 350.00 3/6/2018 REIMBURSE S/R FOR BANK FEES LOCK BOX FEE

62191 2 22.50 3/6/2018 REIMBURSE S/R FOR BANK FEES POSITIVE PAY & ACH MONITOR FEES 372.50 09 TRX#

62193 1 15.00 3/6/2018 REIMBURSE S/R FOR BANK FEES POSITIVE PAY & ACH MONITOR FEES 15.00 10 TRX#

62194 1 15.00 3/6/2018 REIMBURSE S/R FOR BANK FEES POSITIVE PAY & ACH MONITOR FEES 15.00

U:\BPhillips\EXPENSE REPT. ATTACH\MEETING DATE 3-20-18.xlsx

March 22, 2018

TREASURER'S REPORT 2018 RECEIPTS AND BILLS

jGENERAL FUND

Real Estate Tax $1,045,842.42 Accounts Payable $211,498.60 Earned Income Tax $256,934.70 Electronic Pmts: Local Service Tax $6,938.13 Credit Card $4,913.83 Transfer Tax $22,729.48 Postage $1,000.00 General Fund Interest Earned $3,557.19 Debt Service $9,460.82 Total Other Revenue $46,369.61 Payroll $185,663.67 Total Receipts: $1,382,371.53 Total Expenditures: $412,536.92

!STATE LIQUID FUELS FUND

Receipts $550,991.40 Interest Earned $0.56 Total State Liqud Fuels: $550,991.96 Expenditures: $0.00

!SINKING FUND

Receipts $0.00 Accounts Payable $4,649.89 Interest Earned $1,599.74 Credit Card $0.00 Total Sinking Fund: $1,599.74 Total Expenditures: $4,649.89

!TRANSPORTATION FUND

Receipts $0.00 Interest Earned $408.09 Total Sinking Fund: $408.09 Expenditures: $0.00

!SEWER OPERATING FUND

Accounts Payable $61,965.07 Receipts $79,025.18 Debt Service $28,240.59 Interest Earned $205.77 Credit Card $0.00 Total Sewer: $79,230.95 Total Expenditures: $90,205.66 I REFUSE FUND

Receipts $28,960.70 Interest Earned $318.98 Total Refuse: $29,279.68 Expenditures: $74,073.92

IBOND FUND

Receipts $0.00 Accounts Payable $125,077.08 Interest Earned $7,387.01 Credit Card $5,760.00 Total Sewer Sinking Fund: $7,387.01 Total Expenditures: $130,837.08

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $631.92 Total Sewer Sinking Fund: $631.92 Expenditures: $15.00

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $551.92 Total Operating Reserve Fund: $551.92 Expenditures: $15.00

EAST GOSHEN TOWNSHIP

MEMORANDUM

TO: BOARD OF SUPERVISORS

FROM: BRIAN MCCOOL

SUBJECT: PROPOSED PAYMENTS OF BILLS

DATE: 03-22-2018

Please accept the attached Treasurer's Report and Expenditure Register Report for consideration by the Board of Supervisors. I recommend the Treasurer's Report and each register item be approved for payment.

The attached report includes all of the receipts and expenses reported for the meeting that was cancelled last week as well as receipts and expenditures for this week.

General Fund expenses include $50,149 for the 3rd of 4 installments for worker's compensation insurance, $49,140 for health insurance and $25,204 for the first payment for the 2017 audit. Real Estate Tax revenue is much higher than usual due to the discount due date approaching.

State Liquid Fuel Revenues reflect the 2018 allocation from the state that was received in early March.

Bond Fund expenses include $106,145 for engineering costs for both the Milltown Dam and Hershey's Mill Dam, $13,172 for engineering costs associated with Segment C of the Paoli Pike trail and $5,760 for basketball court expenses (credit card charge reimbursed general fund).

Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.

F:\Data\Shared Data\Finance Dept\ Treasurers' Reports \2018 \ 03-22-2018 \ 03-22-2018 Memo.docx

EAST GOSHEN TOWNSHIP

MONTHLY DEBT PAYMENT BREAKDOWN

March 25, 2018

GENERAL FUND:

Interest Principal Year of Loan Original Remaining Retirement payment payment Issuance Description loan amount Principal Date

$7,589.19 $0 2003 Multi purpose $5,500,000 $2,113,000 2023

9 projects

$1,563.10 $0 1999 Applebrook $3,000,000 $462,000 2019

Park

$308.53 $0 2000 Spray $287,000 $89,000 2021

Irrigation

SEWER FUND:

Interest Principal Loan Original Remaining Retirement

payment payment Description loan amount Principal Date

$22,859.10 $0 2008 RCSTP $9,500,000 $6,927,000 2032

Expansion

$5,381.49 $0 2013 Diversion $2,500,000 $2,118,000 2033

Projects

U:\bmccool\2018\Journal Entries\Debt Service\2018 - Debt Service Report for Treasurers Report.xlsx

East Goshen Township Fund Accounting

Report Date 03/22/18

MARP05 run by BARBARA 3 : 11 PM

Expenditures Register

GL-1803-62396

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

2226 21ST CENT.MEDIA NEWS #884433

2695

2491

54486 1 01401 3400 ADVERTISING - PRINTING NOTICE - EAST GOSHEN TWP HISTORICAL

BRICKHOUSE ENVIRONMENTAL 54488 1 01454 3100 PROFESSIONAL SERVICES PROF.SERVICE FEBRUARY 2018 - WATER QUALITY CHECK - EGT PARK

COMCAST 8499-10-109-0107472 54489 1 01401 3210 COMMUNICATION EXPENSE 0107472 3/17-4/16/18 PW TV

418 EAGLE POWER AND EQUIPMENT 54491 1 01430 2330 VEHICLE MAINT AND REPAIR SPACERS, RINGS & BUCKET PINS

489 FISHER & SON COMPANY INC 54492 1 01454 3740 EQUIPMENT MAINT. & REPAIR BUILDERS MIX, LIME & MESA

2999 FITZPATRICK, CARA M.

1541508 03/22/18

1101 03/22/18 . .

031018 03/22/18 ...

T452445 03/22/18

0000182132-IN 03/22/18

54493 1 01414 3100 COURT REPORTERS 030618 03/22/18 . TRANSCRIPT - MALVERN INST. 2/13/18

3000 GARNET FORD 54494 1 01430 2330 VEHICLE MAINT AND REPAIR C39857 03/22/18 REPLACE LEAKING COOLER FORD F-350

03/22/18 84.03

84.03

03/22/18 447.00

447.00

03/22/18 10.52

10.52

03/22/18 128.60

128.60

03/22/18 2,403.00

2,403.00

03/22/18 175.00

175.00

. -- 03/22/18 1,280.34

1,280.34

1

East Goshen Township Fund Accounting

Report Date 03/22/18

MARP05 run by BARBARA 3 11 PM

Expenditures Register

GL-1803-62396

BATCH 3A OF 3A

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

553 GORDON, MARK A.

719

2442

54495 1 01401 3000 GENERAL EXPENSE PARKING FOR DVRPC MEETING - PHILA.

KEEN COMPRESSED GAS COMPANY 54496 1 01430 2330 VEHICLE MAINT AND REPAIR LEASE ARGON CYLINDER

KENT AUTOMOTIVE 54497 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS REINFORCE TOOL BAGS 54499 1 01437 2460 GENERAL EXPENSE - SHOP

CROWN POINT DRILL SET

739 KNOX EQUIPMENT RENTALS INC. 54498 1 01438 3840 EQUIPMENT RENTAL CHIPPER RENTAL 3/1-3/6/18

765 LENN! ELECTRIC CORPORATION 54501 1 01409 3740 TWP, BLDG. - MAINT & REPAIRS RETROFIT LIGHTS WITH LED LAMPS 54502 1 01409 3840 DISTRICT COURT EXPENSES REPLACE BALLASTS & LAMPS - DIST.CT.

808 MAILLIE FALCONIERO & CO. 54504 1 01402 3110 AUDITING EXPENSE PART'L BILLING - 2017 EGT FINANCIAL STATEMENTS & PREPARATION

2750 MRM WORKER'S COMP. FUND

031518

72025155

9305640638

9305650986

25471.1.2

180255

180257

1000073359

54503 1 01486 3500 INSURANCE COVERAGE -PREM. 1718PRJ661 3RD OF 4 INSTALLMTS. #MRM1718-352

03/22/18 03/22/18 18.00

18.00

03/22/18 03/22/18 61.00

61.00

03/22/18 03/22/18 210.15

03/22/18 03/22/18 375.35

585.50

03/22/18 03/22/18 973.50

973.50

03/22/18 03/22/18 762.00

03/22/18 03/22/18 929.40

1,691.40

03/22/18 03/22/18 25,204.00

25,204.00

03/22/18 03/22/18 50,149.13

50,149.13

2

East Goshen Township Fund Accounting

Report Date 03/22/18

MARP05 run by BARBARA 3 11 PM

Vendor Req # Budget# Sub# Description

2771 TARABORRELLI, CHRISTINE 54507 l 01452 3050 EGG HUNT

Expenditures Register

GL-1803-62396

BATCH 3A OF 3A

PAGE 3

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

032018 03/22/18 03/22/18 64.60 REIMBURSEMENT FOR EGG HUNT SUPPLIES

64.60

East Goshen Township Fund Accounting

Report Date 03/22/18

MARP05 run by BARBARA 3 11 PM

Expenditures Register

GL-1803-62396

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

05 SEWER OPERATING

151 BLOSENSKI DISPOSAL CO, CHARLES 54487 1 05422 4502 R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 3/5/18

765 LENNI ELECTRIC CORPORATION 54500 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. REINSTALL LIGHT OVER WET WELL-BKWY

2827 PECO - 04725-43025

16359

180248

54506 1 05420 3602 C.C. COLLECTION -UTILITIES 031218 04725-43025 2/7-3/8/18 WYLPEN PUMP

2439 VERIZON -7041 54508 1 05422 3601 R.C. COLLEC.-UTILITIES 3/7-4/6/18 030718-7041

03/22/18 03/22/18 181.00

181.00

03/22/18 03/22/18 328.19

328.19

03/22/18 03/22/18 638.56

638.56

03/22/18 03/22/18 207.43

207.43

4

ast Goshen Township Fund ~ccounting

eport Date 03/22/18

~P05 run by BARBARA 3 11 PM

Expenditures Register

GL-1803-62396

BATCH 3A OF 3A

PAGE

endor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

07 MUNICIPAL AUTHORITY

808 MAILLIE FALCONIERO & CO. 54505 1 07424 3110 MUNIC.AUTH.-AUDITING

FUND SUMMARY

PROGRESS BILLING - M.AUTHORTY 2017 FINANCIAL STATEMENTS

Fund Bank Account Amount Description

01 01 05 05 07 07

83,275.62 GENERAL FUND 1,355.18 SEWER OPERATING 6,964.00 MUNICIPAL AUTHORITY

91,594.80

PERIOD SUMMARY

Period Amount

1803 91,594.80

91,594.80

/

1000073248 03/22/18 03/22/18

20 Printed, totaling

6,964.00

6,964.00

91,594.80 91,594.80

5

MCMAHON

ii;t~i§t1lt~i;jf.sit.J¢i#kW1¢14i•ff:jQf·i¢1$1#:fj

March 2, 2018

Mr. Louis (Rick) Smith, Jr. Township Manager, East Goshen Township 1580 Paoli Pike West Chester, PA 19380

RE: Paoli Pike Shared Use Path Project: Segments C through G East Goshen Township, Chester County McMahon Project No. 816417.21, .22, .23

Dear Mr. Smith :

McMAHON ASSOCIATES, INC.

840 Springdale Drive Exton, PA 19341 p 610-594-9995 I f 610-594-9565

PRINCIPALS Joseph W. McMahon, P.E. Joseph J. DeSantis, P.E., PTOE

John S. DePalma William T. Steffens Casey A. Moore, P .E. Gary R. McNaughton, P.E., PTOE

As you are aware, it is our intent to submit a NPDES Permit application to the Pennsylvania Department of Environmental Protection (DEP) for the following project in East Goshen Township's name:

1. Project Name: Paoli Pike Shared Use Path Project: Segments C through G

1. Project Description: This project is construction of segments of the Paoli Pike Shared Use path between Reservoir Road and Applebrook Park in East Goshen Township. This project will consist of the

construction of approximately 4,800 linear feet (0.90 miles) of an 8-foot to 10-foot wide shared use path along adjacent to Paoli Pike through the Township. The path will consist of pervious asphalt pavement with concrete ADA curb ramps at intersections and major driveways.

Segment C will consist of a 10-foot wide shared use path on the north side of Paoli Pike between Reservoir Road and Boot Road, with a horizontal and vertical alignment independent to Paoli Pike. · Segments D and E will consist of a shared use path on the south side of Paoli Pike. The path will cross an unnamed tributary to Ridley Creek utilizing an existing culvert within the Goshen Village Shopping Center. Additionally, the shoulder on the south side of Paoli Pike will be removed and replaced with a new curb and a 5-foot wide curbed grass buffer separating the path from the roadway between the Goshen Village Shopping Center Access and North Chester Road. Path segments F & G will continue east from North Chester Road and complete connections within Applebrook Park to the east of the Township Park Driveway/Hibberd Lane.

Other project improvements include modification of existing drainage structures (stormwater inlets) as necessary to accommodate the new path, installation of protective fencing where required, paving Paoli Pike between Saratoga Drive and North Chester Road, and installing a new 200' mountable grass median on the east side of North Chester Road within Paoli Pike.

Engineering I Planning I Design I Technology mcmahonassociates.com

Acts 14, 67, 68 and 127, which amended the Municipalities Planning Code, direct state agencies to consider comprehensive plans and zoning ordinances when reviewing applications for permitting of facilities and infrastructure, and specify that state agencies may rely upon comprehensive plans and zoning ordinances under certain conditions as described in Sections 619.2 and 1105 of the Municipalities Planning Code. The Pennsylvania Department of Environmental Protection's Policy for Consideration of Local Comprehensive Plans and Zoning Ordinances in DEP Review of Permits for Facilities and Infrastructure (DEP' s Land Use Policy) provides direction and guidance to DEP staff, permit applicants, and local and county governments for the implementation of Acts 67, 68 and 127 of 2000. This policy can be found at www.depweb.state.pa.us; keyword: Land Use.

In accordance with DEP's Land Use Policy, enclosed please find a Municipal Land Use Letter that is to be

submitted with our permit application to DEP. Please complete the attached form and return within 30 days to Mr. Stephen Giampaolo, P.E.

Please do not send this form to DEP, as we must include the Municipal Land Use Letter with our permit application. If we do not receive a response from you within 30 days, we shall proceed to submit our permit application to DEP without the Municipal Land Use Letter. If the Municipal Land Use Letter is not submitted with our permit application, and we provide proof to DEP that we attempted to obtain it, DEP will assume there are no substantive land use conflicts and proceed with the normal application review process.

Please recognize receipt of the notification by signing for the certified mail. The certified mail receipt will be forwarded to the PA DEP and the Chester County Conservation District as evidence of your notification. We appreciate your time and efforts. Should you have any questions or require additional information, feel free to contact me at 610-594-9995 (ext. 5129). 2P.y(4

Steve Giampaolo, P.E. Senior Project Manager

SCG/jmw

cc: Ryan Gallagher, Assistant Manager, DVRPC

I: \eng\816417\ Design\ Environmental\NPDES\Municipal Notification\ East Goshen Township Notification Letter.doc

MUNICIPAL LAND USE LETTER

Date:

To: East Goshen Township (Name of Applicant)

From: East Goshen Township/Borough/City

Re: East Goshen Township, Paoli Pike Shared Use Path Project Segments C- G

(Name of DEP Permittee)

The municipality of East Goshen states that it:

___ has adopted a municipal or multi-municipal comprehensive plan.

If yes, please provide date of adoption:

___ has not adopted a municipal or multi-municipal comprehensive plan.

The municipality of ______ states that it:

___ has adopted a county zoning ordinance, or a municipal or joint-municipal zoning ordinance.

___ has not adopted a county zoning ordinance, or a municipal or joint-municipal zoning ordinance.

If applicable:

The municipality of states that its zoning ordinance is generally consistent with its municipal comprehensive plan and the county comprehensive plan.

The above referenced proposed project ___ meets the provisions of the local zoning ordinance

If zoning approval is required for the project to proceed, the above referenced project: ___ has received zoning approval. ___ has not received zoning approval.

If the proposed project has not received zoning approval:

What is the status of the zoning request for the proposed project? (e.g., Special Exception Approval from the Zoning Hearing Board required, Conditional Use approval from the Governing Body required)

v ,,

Is there a legal challenge by the applicant with regard to zoning for the proposed project?

Name and Contact Information for Municipal Zoning Officer:

Additional Comments (attach additional sheets if necessary):

S b ·u dB u m1 e •v:

Name

Title

Contact Information (Address & Phone)

Signature

Date

.. \.

Memo

To: Board of Supervisors From: Jason Lang & Conservancy Board Re: Township Parkland Greening and Reforestation Project Date: March 19th, 2018

The PECO Green Region Open Space Program has been identified as a potential grant funding source to augment Conservancy Board resources, allowing for rapid expansion of 2018 park plantings. This grant program was successfully used to partially fund the 2016 Pat King Pollinator Garden in EGT Park,. which was later named a Pennsylvania Horticulture Society "Garden of Distinction", one of 9 out of 300 such awardees.

If awarded a 2018 PECO Green Region Open Space Program Grant, the Township Conservancy Board will focus the additional resources to plantings in park space along East Boot Road and Clymer's Woods, in Applebrook Park. The result would be 33 additional trees planted in these parklands.

Clymer's Woods Aerial Picture

East Boot Road (Blacksmith Shop & Boardwalk)

The grant application is due Friday, March 301h, 2018. Selections are generally made in September.

Motion: I motion to apply for a PECO Green Region Open Space Grant in the amount of $3,000 and approve a matching expenditure of $3,000.

Computer/H:/East Goshen Township/Budget

J

:1

~ " Ii

RESOLUTION NO.----

TOWNSIDP/BOROUGH/CITY OF East Goshen

Chester COUNTY, PENNSYLVANIA

A Resolution Authorizing Application to the 2018 PECO Green Region Open Space Program for the East Goshen Township Parkland Greening and Reforestation Project

WHEREAS, the Township/Borough/City of East Goshen Township ("Township"/ "Borough"/"City") desiTes to undertake the Parldand Greening and Reforestation project; and

WHEREAS, the Township/Borough/City desires to apply to the PECO Green Region

Open Space Program for a giant for the purpose of carrying out this project; and

WHEREAS, the Township/Borough/City has received and understands the 20 PECO

Green Region Open Space Program Guidelines.

THEREFORE, BE IT RESOLVED THAT the Township/Borough/City Board of Supervisors/Council hereby approves this project and authorizes application to the PECO Green Region Open Space Program in the amount of$ 3,000 , and

BE IT FURTHER RESOLVED, THAT, if the application is granted, the Township/Borough/City commits to the expenditure of matching funds in the amount of $3,000 necessary for the project's success.

SO RESOLVED this 20th day of March 2018

Attest Signatures