Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA Page -1- May 23, 2018

AGENDA EAST GOSHEN TOWNSHIP

BOARD OF SUPERVISORS LONG RANGE BUDGET PLANNING SESSION

Wednesday, May 23, 2018

3:00 PM 1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Public Comment 6. Consider Long Range Budget Planning Memo a) Projections b) Implementation of Paoli Pike Corridor Master Plan c) Website d) Litter Pick-up e) Use of P-cards f) Payment Portal g) Sustainability Initiative h) Public Works Requests i) Sewer/Municipal Authority

7. Any Other Matter 8. Adjournment The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant. Public Comment – Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting.

Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the “E-notification & Emergency Alert” button on the left side of the homepage. Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!

AGENDA Page -2- May 23, 2018

Smart 911 - Smart911 is a new service in Chester County that allows you to create a Safety Profile at www.smart911.com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members’ allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search start faster. F:\Data\Shared Data\Agendas\Board of Supervisors\2018\052318 Long Ranging Budget Meeting for web.doc

Memo

To: Board of Supervisors
From: Jon Altshul
Re: Long-Range Planning Session
Date: May 17, 2018

Long-Term Projections

Based on the best available information, East Goshen will not require a tax increase until 2027. As you know, the Township’s financial policies require that we maintain a fund balance of 20% of annual revenues in the General Fund, plus 5% of general fund annual revenues in the Operating Reserve Fund. The forecast presented today envisions us breaching that 25% threshold in 2027. Nevertheless, the Board should be aware that significant draws on our reserves could imperil our Aaa credit rating before that time. Therefore, the Board may wish to consider revenue enhancements as early as 2023 or 2024—when reserves are expected to be about 50% of annual revenues—to avoid a downgrade and ensure the Township is able to access credit markets at the lowest possible rates.

With that said, and to avoid any misunderstandings, we have been projecting the need for a future tax increase for a very long time, and each forecast fails to account for the annual surpluses we have consistently run. As a point of reference, at the 2012 long range planning session—my first—I projected that the Township would need a tax increase in 2016 or 2017. Clearly, this did not come to pass. I make this point not to criticize my own forecasting or to lull the Board into complacency about the need for fiscal restraint, but simply to observe that long-range forecasting is a remarkably error-riddled exercise since it is impossible to predict when we will receive one-time bumps in revenue.

In any event, as a simple rule of thumb, each 0.1 mill increase in the real estate tax rate generates about $160,000 in additional revenue and adds about $25 to a “typical” homeowner’s real estate bill.

Assumptions

  • The forecast assumes long-term inflation of 2%, which is consistent with Federal Reserve forecasts. On the flip side, the assumption assumes 2% growth in EIT (i.e. wage growth) and real estate transfer tax (housing prices), both of which are more conservative than medium-term forecasts.
  • Police costs are based on WEGO’s 2019-2023 forecasts and then adjusted out five more years, with additional assumptions layered in about starting officer salaries and the Thornbury contract beyond 2018.
  • As a cushion for unknowable future expenses, I have assumed an additional $30,000 in administrative expenses, $35,000 for Public Works and $15,000 for Parks & Recreation annually. In selected other line items, I have erred on the side of being conservative in future budget forecasts.
  • The forecast reflects $75,000 (plus $12,000 in routine pond treatment costs, for a total of $87,000) in annual expenses in 2019-2023 for the remediation of the remaining five ponds after

the Marydell pond work is completed. These figures are in line with the Natural Lands report, assuming that the dredging work is completed in house. Tentatively, the Bow Tree I Pond (southern-most pond in Bow Tree) is scheduled to be dredged beginning in 2019.

  • This assumes $60,000 in annual stormwater material expenses (after completion of the storm sewer repair in the Meadows), which, over the life of the next MS4 permit cycle, is probably very conservative.
  • This assumes $54,000 per year beginning in 2019 for litter collection (see discussion item below)
  • Among other revenue line-items (besides EIT and Real Estate Transfer Tax), Real Estate Property Tax, Local Services Tax and Building Permits are projected to remain flat, while interest income is projected to gradually fall as rising interest rates are offset by less investable fund balance.
  • The forecast reflects $15,000 annually for new signage in 2019-2021 and an additional $25,000 for a new website design next year, but otherwise does not reflect any costs of implementing the Paoli Pike Corridor Master Plan .

Economic Indicators

Private sector and government economic forecasters anticipate continued strong economic growth over the next several years, with a gradual increase in interest rate and continued full employment, as shown in the table below.

2018 2019 2020 Long-term
Unemployment 3.9% (PNC)
3.8% (Fed Res)
3.6% (PNC)
3.6% (Fed Res)
3.6% (Fed Res) 4.5% (Fed Res)
Inflation (CPI) 2.5% (PNC)
1.9% (Fed Res)
2.1% (PNC)
2.0% (Fed Res)
2.1% (Fed Res) 2.0% (Fed Res)
Housing prices (Case Schiller) 5.1% (PNC) 2.2% (PNC)
Wage Growth 2.9% (PNC 3.8% (PNC)
Interest Rates (Federal Funds Rate) 1.65% (PNC)
2.1% (Fed Res)
2.39% (PNC)
2.9% (Fed Res)
3.4% (Fed Res) 2.9% (Fed Res)

Sources: PNC, National Economic Outlook, March 2018 & Economic Projections of Federal Reserve Board Members, March 2018

Implementation of Paoli Pike Corridor Master Plan

This year we are taking the following steps to implement the PPCMP:

  • Develop zoning overlay for corridor
  • Develop new Township brand
  • Purchase selected new signs and integrate new brand into letterhead, website, etc

However, these expenditures represent a rounding error compared to the $6.7 million cost of implementing the entire PPCMP. Simply put, staff seeks formal guidance from the Board on how we should proceed with and/or prioritize these projects over the short and long-term. I have attached a copy of Appendix D (Engineer’s Opinion of Costs) from the PPCMP for context.

Website redesign

The Township has been leapfrogged by other municipalities with respect to our website design. A business is its website. More than ever, it is the “Director of First Impressions”. As mentioned above, the budget forecast includes $25,000 in next year’s budget for this purpose. This project is also a logical next step after the Township develops a new brand design later this year.

Litter Pick-up

In response to concerns raised by Mike, staff has discussed instituting a road litter program with AJ Blosenski. To that end, the long-term forecast includes $54,000 per year, beginning in 2019, to reflect this additional cost. Note that because of the large percentage of the Township not served by the Township’s refuse contract, this cost would need to be borne by the general fund to prevent a “free rider” problem.

Consider heavier use of PLGIT P-Card for routine purchases

PLGIT provides rebates to municipalities based on their annual P-card “spend”, as shown below.

Volume (Sept 1-August 31) Rebate
$50,000-$99,000 0.3%
$100,000-$499,999 0.6%
$500,000-$999,999 0.8%
$1m-$2.5m 1.0%
$2.5m-$5m 1.1%

For perspective in 2017, we charged a little under $50,000 to the P-card. Barb has identified approximately 30 vendors that accept credit card payments with no fees (list is attached). Most of these are for routine payments (PECO, Verizon, Aqua, CCSWA, Blosenski) or familiar vendors with whom we have long-standing relationships (e.g. Buckley Brion, Highway Materials). Collectively, we spend slightly over $2 million per year with these vendors, meaning that we’d be eligible for a rebate of over $20,000.

PLGIT uses a September-August year to calculate the rebate, meaning that if we increased our use of the P-Card now, the first major rebate would not be awarded until early fall 2019. We project that a $20,000 rebate would be allocated across the general fund, sewer fund and refuse fund as follows:

General Fund Sewer Fund Refuse Fund Total
$5,000 $2,500 $12,500 $20,000

After discussing this matter with Barb and AMS, we would propose the following system to take advantage of these rebates while continuing to ensure that the BOS can exercise oversight of the Township’s finances:

  1. We obtain a new p-card for the Finance Department (currently Rick, Mark M and Jason have p-cards).
  1. Purchases that we’d like to make on the p-card—other than those made by Rick, Mark and Jason—would be included in a separate batch in the Treasurer’s report from payments made by check.
  2. For accounting purposes, it is straight-forward for Barb to enter these requisitions as credit card payments in AMS. Basically, instead of entering a check number in AMS, Barb would simply enter “CC” for credit card. As a result, we would still be able to search all payments by vendor, regardless of how the purchase was made.
  3. We would sometimes need to follow Resolution 09-21 (which authorizes staff to make payments prior to approval by the Board) if a due date fell before the next BOS meeting, but this would be no different than the current process for cutting paper checks and regardless, the payment would be on the next Treasurer’s Report, even if it was paid in advance.
  4. Ordinary p-card purchases made by Rick, Mark or Jason for things like seminars, meals, hotels and random supplies would appear in the Credit Card section of Treasurer Reports, as they do presently, but now along with those p-card payments made by the Finance Department. Those p-card purchases already approved by the Board that appear on the credit card statement would be denoted as “already approved” in the report that the Board receives.

For these reasons, I recommend that the BOS authorize increased use of the P-Card to the vendors listed (as well as any replacement vendors to those listed), as well as for continued routine purchases for which the P-Card would normally be used. I have attached a recent article from the Inquirer for your reference.

Payment Portal

A payment portal would allow residents to view their sewer and refuse balance on line and manage either one-time or recurring payments. The portal would also allow residents to receive email bills in addition to or in lieu of paper bills.

We have identified a payment portal solution (Paymentus) that interfaces directly with AMS, so Brian will not have to manually re-enter payments into AMS. Paymentus was recommended to us by AMS because of how well the two software systems work together. Paymentus also offers a mobile app standard and, for an additional one-time fee of $5,000, the ability to email bills or pay by text message. Paymentus expects that a portal would require less than 90 days to go live.

The cost of the portal would depend on whether the service fees would be absorbed by the Township or paid by the user. The only one-time costs would be for email bills ($5,000) and a card reader ($250).

  1. If the Township absorbs the fee, Paymentus would charge us $2.25/transaction [1]
  2. If the user absorbs the fee, Paymentus would charge us $4.50/transaction [1]

[1] The per transaction cost works in increments of $500. So, for example a payment of $800 would correspond with $4.50 ($2.25+$2.25) under the Township-absorbed model and $9.00 ($4.50+$4.50) under the user-absorbed model. We would expect that the vast majority of payments would be for under $500. Brian estimates that we currently receive about 5 credit card payments per year in amounts over $500.

There are 5,005 total utility accounts in the Township, so assuming every resident paid through the portal 4x per year, the maximum annual cost with a Township absorbed fee model would be $45,045, excluding one-time fees. Realistically, however, no more than 1/5th of the accounts will actually use the portal to pay bills, so the actual costs would probably be about $9,000 per year.

Currently, ratepayers can pay utility bills in one of three ways:

  1. By sending their payment to the M&T lockbox in Baltimore (either manually or via on-line banking) We pay M&T $8,400 per year for this service, which drastically reduces the amount of time Brian spends on processing payments, but frequently results in posting errors that can be labor-intensive to research and correct.; Approximately 43% of payments are received through the lockbox.
  2. By sending (or dropping off) their payment directly to the Township (either manually or via on-line banking) We estimate that the Township’s labor costs for processing manual payments works out to about 30 cents per bill, although that labor cost would be incurred regardless of whether Brian was processing manual payments or not.; Over 54% of payments are received this way, meaning that the Township incurs about $6,000 per year in labor costs to process them.
  3. By paying on-line on the Township’s Municipay platform. Municipay does not interface with AMS, so Brian needs to manually enter the payments in AMS. Municipay charges the greater of $3 or 2.65%; ratepayers can also pay by echeck for a flat $1.50. All fees are borne by ratepayers.; Approximately 3% of payments are made by credit card. Therefore, back of the envelope, the Township’s labor costs are about $1,800 per year to manually enter the payments.; If we had a payment portal, there would no longer be a need for Municipay for utility bills.

Bottom Line: A Payment Portal would draw payments away from the Lockbox and Municipay, but probably have a negligible impact on payments made to the Township building. Ultimately, the cost of a payment portal is roughly in line with the cost of the lockbox.

Note that we’d also realize modest savings long-term from portal users who opt out of receiving paper bills (i.e. we’d save about $.38/bill on postage and $.08/bill on invoice paper), although it is impossible to predict how many people will opt out of a paper bill.

To begin with, we would offer this portal only for utility bills, as a payment portal for Real Estate Taxes raises a host of separate and not easily resolved issues.

From a policy standpoint, there are two issues that the BOS needs to think about:

  1. Clearly, offering a robust payment portal is long overdue in 2018. Ratepayers should have this type of IT solution, as they would for their PECO, Aqua, cable or wireless bill, even if no other Township offers anything like this. By offering this service first, others will follow suit.
  2. Arguably, it’s unfair to ratepayers paying by check having to subsidize those paying by credit card or text message, but the fact that the Township-absorbed fee model is so much cheaper than the user-fee model undermines that argument. Ultimately $9,000 is a drop in the bucket compared to nearly $4.5 million in combined sewer and trash bills annually.

I have attached selected pages from Paymentus’s slide presentation that Brian and I viewed two months ago.

Sustainability Initiative

David and Jason have been analyzing best practices around sustainable communities. A worksheet on this issue is attached for general discussion.

Public Works Requests

Items not currently in 2018-2022 CIP

  • We are scheduled to replace a pick-up truck in 2019. However, Mark would like to purchase a small dump truck (e.g. a Ford F550) instead at an additional cost of $35,000. This larger truck will allow Public Works to more efficiently haul heavy materials (gravel, dirt) than they can currently in an F350 and at the same time, allow for Township dump trucks to access driveways, right of ways and easements without inadvertently turfing lawns, as sometimes happens with the larger dump trucks. Note that this additional cost, which would need to come from the General Fund, is not reflected in the long-range budget.
  • Replace Township Building Roof (as opposed to Garage roof) in 2023, which offers an opportunity for solar panel installation.
  • Route 352 and King Road. After completion of the Interactive Signals on West Chester Pike and the Boot Road restriping, I anticipate that we’ll have about $386,000 available in non-impact fee transportation funds available for any improvements to the King Road/Rte 352 intersection. Assuming our share of any improvements is $1 million and we can secure a grant with a matching requirement of 40% or less, this project will therefore have no impact on taxpayer funds.

Sewer/Municipal Authority

Note that the 2018-2022 CIP did not reflect any funding for the proposed caustic soda system. This system is needed to avoid having to manually add caustic soda, which is both dangerous and inefficient. We might propose amending the CIP this year to include $170,000 for this project in 2020, and then not beginning the SBR Tank Improvements (one per year for three years at a cost of about $125,000 annually) until 2021. It’s important to stress that we are carefully timing all Municipal Authority projects to avoid one-time spikes in sewer rates.

In addition, the generators at Ridley Creek and Hershey’s Mill Pump Station, both of which date back to 1996, will need to be replaced soon. These replacements are not reflected in the current CIP. However, they are fully depreciated and can be replaced with funds from the Sewer Capital Reserve Fund with no impact on rates.

Annual Planning Session Forecast, 2019-2028

Account Title 2014 Actual 2015 Actual 2016 Actual 2017 Actual 2018 Budget 2019 Estimate 2020 Estimate 2021 Estimate 2022 Estimate 2023 Estimate 2024 Estimate 2025 Estimate 2026 Estimate 2027 Estimate 2028 Estimate Avg Inc. 2019-2028
BEGINNING FUND BALANCE* 8,035,644 7,680,578 7,298,980 7,098,330 6,783,299 6,372,829 5,872,345 5,447,934 4,855,877 4,069,248 3,104,717
EMERGENCY SERVICES EXPENSES 4,029,662 4,090,894 4,156,575 4,543,688 4,101,440 4,470,493 4,602,062 4,746,105 4,907,555 5,048,681 5,147,763 5,326,529 5,515,778 5,731,211 5,928,422 3.2%
PUBLIC WORKS EXPENSES 2,436,092 2,556,554 2,782,793 2,435,170 2,637,576 2,712,934 2,779,569 2,847,762 2,911,516 2,957,379 3,027,070 3,098,644 3,195,656 3,247,665 3,325,231 2.3%
ADMINISTRATION EXPENSES 1,793,139 1,606,092 1,692,968 1,796,279 2,218,972 1,947,976 1,950,523 1,989,678 2,058,723 2,020,682 2,070,216 2,121,275 2,173,917 2,228,204 2,284,201 1.8%
ZONING/PERMITS/CODES EXPENSES 392,097 518,582 391,629 424,069 465,911 472,056 483,295 494,850 510,924 527,627 544,987 563,038 581,813 601,348 621,679 3.1%
PARK AND RECREATION EXPENSES 549,468 541,579 654,697 675,456 690,256 602,046 611,805 621,814 635,241 649,153 591,573 606,526 619,037 635,131 651,838 1.0%
TOTAL CORE FUNCTION EXPENSES 9,200,457 9,313,701 9,678,663 9,874,661 10,114,155 10,205,505 10,427,253 10,700,210 11,023,958 11,203,521 11,381,609 11,716,013 12,086,202 12,443,559 12,811,371 2.6%
EMERGENCY SERVICES REVENUES 72,302 71,533 61,694 71,773 77,628 78,421 79,229 80,054 80,895 81,753 82,628 83,520 84,431 85,359 86,306 1.1%
PUBLIC WORKS REVENUES 870,332 832,631 1,149,265 940,177 1,010,195 1,034,108 1,058,628 1,083,770 1,084,793 1,111,230 1,138,339 1,166,139 1,194,648 1,223,885 1,253,869 2.2%
ADMINISTRATION REVENUES 508,068 353,853 369,365 376,317 334,024 319,544 323,938 328,419 424,550 354,213 358,969 363,820 368,768 373,816 378,966 2.5%
ZONING/PERMITS/CODES REVENUES 397,559 439,042 336,600 262,958 259,725 259,725 259,725 259,725 259,725 259,725 259,725 259,725 259,725 259,725 259,725 0.0%
PARK AND RECREATION REVENUES 112,394 141,785 148,778 212,125 140,976 122,587 124,688 126,832 129,019 131,249 133,524 135,844 138,211 140,626 143,088 1.7%
TOTAL CORE FUNCTION REVENUES 1,960,656 1,838,843 2,065,702 1,863,350 1,822,548 1,814,384 1,846,208 1,878,800 1,978,981 1,938,169 1,973,185 2,009,049 2,045,784 2,083,411 2,121,954 1.8%
NET EMERGENCY SERVICES 3,957,360 4,019,361 4,094,881 4,471,915 4,023,812 4,392,073 4,522,833 4,666,052 4,826,660 4,966,929 5,065,135 5,243,009 5,431,348 5,645,852 5,842,115 3.2%
NET PUBLIC WORKS 1,565,759 1,723,923 1,633,528 1,494,993 1,627,381 1,678,826 1,720,941 1,763,992 1,826,723 1,846,149 1,888,731 1,932,505 2,001,008 2,023,780 2,071,362 2.4%
NET ADMINISTRATION 1,285,071 1,252,239 1,323,603 1,419,962 1,884,948 1,628,433 1,626,585 1,661,258 1,634,173 1,666,469 1,711,248 1,757,455 1,805,149 1,854,388 1,905,236 1.8%
NET ZONING/PERMITS/CODES (5,463) 79,539 55,029 161,110 206,186 212,331 223,570 235,125 251,199 267,902 285,262 303,313 322,088 341,623 361,954 6.1%
NET PARK AND RECREATION 437,073 399,794 505,919 463,330 549,280 479,460 487,116 494,982 506,222 517,904 458,049 470,682 480,825 494,506 508,750 0.8%
CORE FUNCTION NET SUBTOTAL 7,239,801 7,474,857 7,612,960 8,011,310 8,291,607 8,391,121 8,581,045 8,821,409 9,044,977 9,265,352 9,408,425 9,706,964 10,040,418 10,360,149 10,689,417 2.7%
DEBT - PRINCIPAL 456,000 476,000 498,000 521,000 549,000 574,000 349,999 362,998 376,999 392,000 320,000 330,000 335,000 340,000 350,000 n/a
DEBT - INTEREST 189,723 170,420 150,271 147,380 249,458 224,399 203,872 188,758 173,076 156,789 141,400 135,000 128,400 121,700 114,475 n/a
TOTAL DEBT SERVICE 645,723 646,420 648,271 668,380 798,458 798,399 553,871 551,756 550,075 548,789 461,400 465,000 463,400 461,700 464,475 -5.2%
TOTAL CORE FUNCTION NET 7,885,523 8,121,277 8,261,231 8,679,690 9,090,065 9,189,520 9,134,916 9,373,165 9,595,052 9,814,141 9,869,825 10,171,964 10,503,818 10,821,849 11,153,892 2.2%
NON-CORE FUNCTION REVENUE
EARNED INCOME TAXES 4,617,402 4,603,401 4,957,049 4,979,900 5,181,600 5,285,232 5,390,937 5,498,755 5,608,730 5,720,905 5,835,323 5,952,030 6,071,070 6,192,492 6,316,341 2.0%
REAL ESTATE PROPERTY TAX 2,007,210 1,999,431 2,032,973 2,028,636 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 2,026,129 0.0%
REAL ESTATE TRANSFER TAX 539,481 1,043,058 686,792 1,209,969 575,000 586,500 598,230 610,195 622,398 634,846 647,543 660,494 673,704 687,178 700,922 2.0%
CABLE TV FRANCHISE TAX 450,651 462,319 470,236 476,562 489,600 499,392 509,380 519,567 529,959 540,558 551,369 562,397 573,644 585,117 596,820 2.0%
LOCAL SERVICES TAX 315,862 324,382 374,624 344,447 348,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 0.0%
OTHER INCOME 35,585 30,852 33,682 69,695 74,670 74,670 74,670 69,670 64,670 59,670 54,670 49,670 44,670 39,671 34,672 -8.1%
TOTAL NON CORE FUNCTION REVENUE 7,966,191 8,463,444 8,555,356 9,109,208 8,694,999 8,821,923 8,949,345 9,074,316 9,201,887 9,332,109 9,465,035 9,600,719 9,739,218 9,880,587 10,024,884 1.4%
NET RESULT 80,667 342,167 294,124 429,518 (395,066) (367,597) (185,570) (298,849) (393,165) (482,032) (404,790) (571,245) (764,600) (941,262) (1,129,008)
ENDING FUND BALANCE 7,640,578 7,312,980 7,113,410 6,799,481 6,390,134 5,890,796 5,467,555 4,876,690 4,091,277 3,127,986 1,975,708
ENDING FUND BALANCE AS % OF EXP 70.0% 66.5% 64.8% 60.4% 55.2% 50.1% 46.2% 40.0% 32.6% 24.2% 14.9%

McMahon Associates, Inc.

Engineer's Conceptual Opinion of Cost

10/30/2017

Prepared By: JEM

Checked By: DHW

Municipality: East Goshen Township, Chester County, PA

Project Name: Paoli Pike Corridor Master Plan

Project Number: 816646.11

Plan Title: Paoli Pike Corridor Master Plan Concepts 1 - 7

Roadway(s): Paoli Pike (SR 2014)

Project Description: Refer to Destination Paoli Pike - Paoli Pike Corridor Master Plan Report

Unit Costs Last Revised: 8/3/2017

Source: ECMS Bid Price History and Similar Project Experience

Disclaimer: McMahon Associates, Inc. has provided this opinion of cost as requested by the client. Please note that opinions of cost are subject to change based on plan/design revisions, fluctuations in unit costs, field conditions, and differences in locale. Opinions of cost are provided for use in budgeting, but in no way intended to be construed as a final cost for the project. Final costs are contingent only on actual bids from contractors. McMahon Associates, Inc. will not be held responsible for differences between this opinion of cost and contractor bid costs.

Estimate No. Description Project Overview Page Number Conceptual Plan Figure Number Cost
1 Traffic Calming between Airport Road and Ellis Lane 4-5 4.3 $983,800.00
2 Traffic Calming at Township Park Entrance (East) 4-6 4.4 $660,280.00
3 Traffic Calming at Line Road 4-6 4.5 $412,000.00
4 Boot Road Path 3-8 3.7 $550,190.00
5 Reservoir Road Path 3-10 3.8 $237,940.00
6 Reservoir Road Shared Lane 3-11 3.9 $30,200.00
7 Goshenville Streetscape Enhancements 5-4 5.3 $3,804,030.00
Total Cost $6,678,440.00

General Notes:

  1. Refer to the intersection spreadsheet details relating to cost calculations and individual intersection assumptions.
  2. Contingency and inspection percentages are based on PennDOT Pub. 352. Inflation is not included; costs provided are in 2017 dollars.
  3. Further evaluation of the existing signalized intersections within the project limits is required during the preliminary engineering of the project. This evaluation may result in the identification of other improvements and costs not identified within this Engineer's Conceptual Opinion of Cost.
  4. The Engineer's Conceptual Opinion of Cost does not include relocating or resetting existing underground utilities within the limits of the project or the provision of any future utilities. Impacts to existing underground utilities will need to be determined during the preliminary engineering of the project through subsurface utility engineering. Due to visible evidence of subsurface utilities within the project area (underground electric, water, sewer, gas and telecommunication) it is recommended (and likely required by law) that utility test pits be performed during the preliminary engineering of the project.
  5. The Utility Relocations cost is a rough estimate based on relocating existing surface utilities (poles, hydrants, etc.) identified through aerial imagery and limited field views. Underground utility relocations are not included in this estimate. These costs are subject to change through the development of the project and based on the Utility owner's rights.
  6. Estimates of existing and required right of way were developed based on GIS data obtained from Chester County. Existing legal right-of-way lines or property lines have not been independently verified through field survey or deed research. Existing legal rights-of-way and existing property lines, as well as the size and location of any required rights-of-way (temporary or permanent), will need to be determined during the preliminary engineering of the project.
  7. The following costs are rough estimates for budgeting purposes only: Engineering and Permitting, Utility Relocations , and Right of Way. The costs associated with these items will need to be determined through the development of the project.

Engineer's Conceptual Opinion of Cost for
Paoli Pike Corridor Master Plan Concepts 1 - 7
East Goshen Township, Chester County, PA

Estimate 1: Traffic Calming between Airport Road and Ellis Lane

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1 Clearing and Grubbing LS 1 $5,000.00 $5,000.00
2 Class 1 Excavation CY 650 $65.00 $42,250.00
3 Foreign Borrow CY 236 $75.00 $17,700.00
4 Grading (includes topsoil and seeding) SY 0 $15.00 $0.00
5 Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase) SY 500 $125.00 $62,500.00
6 Driveway Adjustments SY 0 $60.00 $0.00
7 Milling and Bituminous Overlay (including Tack Coat) SY 0 $25.00 $0.00
8 Plain Cement Concrete Curb LF 526 $45.00 $23,670.00
9 Plain Cement Mountable Curb LF 1,450 $50.00 $72,500.00
10 Drainage Upgrades New Drainage Structures/Pipe LS 1 $105,000.00 $105,000.00
11 6" Base Drain LF 530 $13.00 $6,890.00
12 Guide Rail LF 38 $55.00 $2,090.00
13 Construction Surveying, Schedule, Equipment Package LS 1 $7,500.00 $7,500.00
14 4" Yellow Pavement Markings, Hot Thermoplastic Paint LF 1,460 $1.50 $2,190.00
15 4" White Pavement Markings, Hot Thermoplastic Paint LF 2,200 $1.50 $3,300.00
16 6" White Pavement Markings, Hot Thermoplastic Paint LF 0 $2.00 $0.00
17 24" White Pavement Markings, Hot Thermoplastic Paint LF 945 $8.00 $7,560.00
18 24" Yellow Pavement Markings, Hot Thermoplastic Paint LF 90 $8.00 $720.00
19 Marking Legend, "ONLY", Hot Thermoplastic Paint EA 0 $160.00 $0.00
20 Marking Legend, "ARROW", Hot Thermoplastic Paint EA 3 $160.00 $480.00
21 Marking Legend, "Shared Lane" EA 0 $450.00 $0.00
22 Signage EA 6 $150.00 $900.00
23 Overhead Lane Use Control EA 1 $15,000.00 $15,000.00
24 Pervious Pavement Path SY 0 $90.00 $0.00
25 Cement Concrete Sidewalk SY 0 $100.00 $0.00
26 ADA Accessible Curb Ramp EA 5 $6,500.00 $32,500.00
27 Traffic Signal Upgrades LS 1 $65,000.00 $65,000.00
28 Rapid Rectangular Flashing Beacon LS 0 $30,000.00 $0.00
Special Items
29 Post Construction Stormwater Management LS 1 $50,000.00 $50,000.00
30 Split Rail Fence LF 0 $22.00 $0.00
31 Sidewalk Protective Fence, Vinyl-Coated Steel LF 0 $184.00 $0.00
32 Landscape Restoration SF 0 $35.00 $0.00
33 Miscellaneous Relocations LS 0 $0.00 $0.00
34 Grade Seperating Wall SF 0 $60.00 $0.00
Streetscaping Items
35 Flush Stamped Asphalt Median SY 0 $160.00 $0.00
36 Landscape Median Area SF 2,400 $8.50 $20,400.00
37 Hardscape Median Area SF 1,350 $19.00 $25,650.00
38 Street Trees EA 0 $800.00 $0.00
39 Pedestrian Scale Street Light EA 0 $14,300.00 $0.00
40 Vertical Banner EA 0 $425.00 $0.00
41 Subtotal Construction Cost Items 1 - 40 $568,800.00
42 Maintenance and Protection of Traffic Approx. 8% of Item 41 $46,000.00
43 Erosion and Sediment Control Approx. 2.5% of Item 41 $15,000.00
44 Mobilization Approx. 5% of Item 41 $29,000.00
45 Contingency Approx. 10% of Items 41 - 44 $66,000.00
46 Total Construction Cost Items 41 - 45 $724,800.00
47 Construction Inspection 15% of Item 46 $109,000.00
48 Total Construction + Inspection Items 46 - 47 $833,800.00
49 Engineering and Permitting Approx. 20% of Item 46 $145,000.00
50 Utilities LS 0 $0.00 $0.00
51 Right-of-Way Rough Estimate LS 1 $5,000.00 $5,000.00
52 Total Project Cost (2017 Dollars) Items 48 - 51 $983,800.00

Assumptions & Notes:

1. Necessary drainage upgrades subject to stormwater analysis during preliminary engineering

Engineer's Conceptual Opinion of Cost for
Paoli Pike Corridor Master Plan Concepts 1 - 7
East Goshen Township, Chester County, PA

Estimate 2: Traffic Calming at Township Park Entrance (East)

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1 Clearing and Grubbing LS 1 $5,000.00 $5,000.00
2 Class 1 Excavation CY 850 $65.00 $55,250.00
3 Foreign Borrow CY 100 $75.00 $7,500.00
4 Grading (includes topsoil and seeding) SY 100 $15.00 $1,500.00
5 Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase) SY 1,226 $125.00 $153,250.00
6 Driveway Adjustments SY 0 $60.00 $0.00
7 Milling and Bituminous Overlay (including Tack Coat) SY 0 $25.00 $0.00
8 Plain Cement Concrete Curb LF 456 $45.00 $20,520.00
9 Plain Cement Mountable Curb LF 800 $50.00 $40,000.00
10 Drainage Upgrades LS 0 $0.00 $0.00
11 6" Base Drain LF 0 $13.00 $0.00
12 Guide Rail LF 0 $55.00 $0.00
13 Construction Surveying, Schedule, Equipment Package LS 1 $5,000.00 $5,000.00
14 4" Yellow Pavement Markings, Hot Thermoplastic Paint LF 1,360 $1.50 $2,040.00
15 4" White Pavement Markings, Hot Thermoplastic Paint LF 1,160 $1.50 $1,740.00
16 6" White Pavement Markings, Hot Thermoplastic Paint LF 0 $2.00 $0.00
17 24" White Pavement Markings, Hot Thermoplastic Paint LF 250 $8.00 $2,000.00
18 24" Yellow Pavement Markings, Hot Thermoplastic Paint LF 40 $8.00 $320.00
19 Marking Legend, "ONLY", Hot Thermoplastic Paint EA 0 $160.00 $0.00
20 Marking Legend, "ARROW", Hot Thermoplastic Paint EA 0 $160.00 $0.00
21 Marking Legend, "Shared Lane" EA 0 $450.00 $0.00
22 Signage EA 6 $150.00 $900.00
23 Overhead Lane Use Control EA 0 $15,000.00 $0.00
24 Pervious Pavement Path SY 0 $90.00 $0.00
25 Cement Concrete Sidewalk SY 0 $100.00 $0.00
26 ADA Accessible Curb Ramp EA 2 $6,500.00 $13,000.00
27 Traffic Signal Upgrades LS 1 $30,000.00 $30,000.00
28 Rapid Rectangular Flashing Beacon LS 0 $30,000.00 $0.00
Special Items
29 Post Construction Stormwater Management Infiltration Trench LS 1 $30,000.00 $30,000.00
30 Split Rail Fence LF 0 $22.00 $0.00
31 Sidewalk Protective Fence, Vinyl-Coated Steel LF 0 $184.00 $0.00
32 Landscape Restoration SF 0 $35.00 $0.00
33 Miscellaneous Relocations LS 0 $0.00 $0.00
34 Grade Seperating Wall SF 0 $60.00 $0.00
Streetscaping Items
35 Flush Stamped Asphalt Median SY 0 $160.00 $0.00
36 Landscape Median Area SF 1,230 $8.50 $10,460.00
37 Hardscape Median Area SF 200 $19.00 $3,800.00
38 Street Trees EA 0 $800.00 $0.00
39 Pedestrian Scale Street Light EA 0 $14,300.00 $0.00
40 Vertical Banner EA 0 $425.00 $0.00
41 Subtotal Construction Cost Items 1 - 40 $382,280.00
42 Maintenance and Protection of Traffic Approx. 8% of Item 41 $31,000.00
43 Erosion and Sediment Control Approx. 2.5% of Item 41 $10,000.00
44 Mobilization Approx. 5% of Item 41 $20,000.00
45 Contingency Approx. 10% of Items 41 - 44 $45,000.00
46 Total Construction Cost Items 41 - 45 $488,280.00
47 Construction Inspection 15% of Item 46 $74,000.00
48 Total Construction + Inspection Items 46 - 47 $562,280.00
49 Engineering and Permitting Approx. 20% of Item 46 $98,000.00
50 Utilities LS 0 $0.00 $0.00
51 Right-of-Way LS 0 $0.00 $0.00
52 Total Project Cost (2017 Dollars) Items 48 - 51 $660,280.00

Assumptions & Notes:

Engineer's Conceptual Opinion of Cost for
Paoli Pike Corridor Master Plan Concepts 1 - 7
East Goshen Township, Chester County, PA

Estimate 3: Traffic Calming at Line Road

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1 Clearing and Grubbing LS 1 $5,000.00 $5,000.00
2 Class 1 Excavation CY 425 $65.00 $27,625.00
3 Foreign Borrow CY 225 $75.00 $16,875.00
4 Grading (includes topsoil and seeding) SY 376 $15.00 $5,640.00
5 Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase) SY 650 $125.00 $81,250.00
6 Driveway Adjustments SY 0 $60.00 $0.00
7 Milling and Bituminous Overlay (including Tack Coat) SY 0 $25.00 $0.00
8 Plain Cement Concrete Curb LF 0 $45.00 $0.00
9 Plain Cement Mountable Curb LF 825 $50.00 $41,250.00
10 Drainage Upgrades LS 0 $0.00 $0.00
11 6" Base Drain LF 0 $13.00 $0.00
12 Guide Rail LF 0 $55.00 $0.00
13 Construction Surveying, Schedule, Equipment Package LS 1 $5,000.00 $5,000.00
14 4" Yellow Pavement Markings, Hot Thermoplastic Paint LF 680 $1.50 $1,020.00
15 4" White Pavement Markings, Hot Thermoplastic Paint LF 120 $1.50 $180.00
16 6" White Pavement Markings, Hot Thermoplastic Paint LF 0 $2.00 $0.00
17 24" White Pavement Markings, Hot Thermoplastic Paint LF 280 $8.00 $2,240.00
18 24" Yellow Pavement Markings, Hot Thermoplastic Paint LF 50 $8.00 $400.00
19 Marking Legend, "ONLY", Hot Thermoplastic Paint EA 0 $160.00 $0.00
20 Marking Legend, "ARROW", Hot Thermoplastic Paint EA 0 $160.00 $0.00
21 Marking Legend, "Shared Lane" EA 0 $450.00 $0.00
22 Signage EA 6 $150.00 $900.00
23 Overhead Lane Use Control EA 0 $15,000.00 $0.00
24 Pervious Pavement Path SY 0 $90.00 $0.00
25 Cement Concrete Sidewalk SY 0 $100.00 $0.00
26 ADA Accessible Curb Ramp EA 0 $6,500.00 $0.00
27 Traffic Signal Upgrades LS 0 $0.00 $0.00
28 Rapid Rectangular Flashing Beacon LS 0 $30,000.00 $0.00
Special Items
29 Post Construction Stormwater Management LS 1 $30,000.00 $30,000.00
30 Split Rail Fence LF 0 $22.00 $0.00
31 Sidewalk Protective Fence, Vinyl-Coated Steel LF 0 $184.00 $0.00
32 Landscape Restoration SF 0 $35.00 $0.00
33 Miscellaneous Relocations LS 0 $0.00 $0.00
34 Grade Seperating Wall SF 0 $60.00 $0.00
Streetscaping Items
35 Flush Stamped Asphalt Median SY 0 $160.00 $0.00
36 Landscape Median Area SF 1,850 $8.50 $15,730.00
37 Hardscape Median Area SF 310 $19.00 $5,890.00
38 Street Trees EA 0 $800.00 $0.00
39 Pedestrian Scale Street Light EA 0 $14,300.00 $0.00
40 Vertical Banner EA 0 $425.00 $0.00
41 Subtotal Construction Cost Items 1 - 40 $239,000.00
42 Maintenance and Protection of Traffic Approx. 8% of Item 41 $20,000.00
43 Erosion and Sediment Control Approx. 2.5% of Item 41 $6,000.00
44 Mobilization Approx. 5% of Item 41 $12,000.00
45 Contingency Approx. 10% of Items 41 - 44 $28,000.00
46 Total Construction Cost Items 41 - 45 $305,000.00
47 Construction Inspection 15% of Item 46 $46,000.00
48 Total Construction + Inspection Items 46 - 47 $351,000.00
49 Engineering and Permitting Approx. 20% of Item 46 $61,000.00
50 Utilities LS 0 $0.00 $0.00
51 Right-of-Way LS 0 $0.00 $0.00
52 Total Project Cost (2017 Dollars) Items 48 - 51 $412,000.00

Assumptions & Notes:

Engineer's Conceptual Opinion of Cost for
Paoli Pike Corridor Master Plan Concepts 1 - 7
East Goshen Township, Chester County, PA

Estimate 4: Boot Road Path

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1 Clearing and Grubbing LS 1 $20,000.00 $20,000.00
2 Class 1 Excavation CY 250 $120.00 $30,000.00
3 Foreign Borrow CY 50 $75.00 $3,750.00
4 Grading (includes topsoil and seeding) SY 610 $15.00 $9,150.00
5 Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase) SY 26 $125.00 $3,250.00
6 Driveway Adjustments SY 0 $60.00 $0.00
7 Milling and Bituminous Overlay (including Tack Coat) SY 0 $25.00 $0.00
8 Plain Cement Concrete Curb LF 50 $45.00 $2,250.00
9 Plain Cement Mountable Curb LF 0 $50.00 $0.00
10 Drainage Upgrades LS 0 $0.00 $0.00
11 6" Base Drain LF 0 $13.00 $0.00
12 Guide Rail LF 0 $55.00 $0.00
13 Construction Surveying, Schedule, Equipment Package LS 1 $5,000.00 $5,000.00
14 4" Yellow Pavement Markings, Hot Thermoplastic Paint LF 0 $1.50 $0.00
15 4" White Pavement Markings, Hot Thermoplastic Paint LF 0 $1.50 $0.00
16 6" White Pavement Markings, Hot Thermoplastic Paint LF 0 $2.00 $0.00
17 24" White Pavement Markings, Hot Thermoplastic Paint LF 280 $8.00 $2,240.00
18 24" Yellow Pavement Markings, Hot Thermoplastic Paint LF 0 $8.00 $0.00
19 Marking Legend, "ONLY", Hot Thermoplastic Paint EA 0 $160.00 $0.00
20 Marking Legend, "ARROW", Hot Thermoplastic Paint EA 0 $160.00 $0.00
21 Marking Legend, "Shared Lane" EA 0 $450.00 $0.00
22 Signage EA 7 $150.00 $1,050.00
23 Overhead Lane Use Control EA 0 $15,000.00 $0.00
24 Pervious Pavement Path SY 765 $120.00 $91,800.00
25 Cement Concrete Sidewalk SY 0 $100.00 $0.00
26 ADA Accessible Curb Ramp EA 7 $6,500.00 $45,500.00
27 Traffic Signal Upgrades LS 0 $0.00 $0.00
28 Rapid Rectangular Flashing Beacon Includes 2 push buttons LS 1 $30,000.00 $30,000.00
Special Items
29 Post Construction Stormwater Management Approx. 10% of Total Construction LS 1 $30,000.00 $30,000.00
30 Split Rail Fence LF 350 $22.00 $7,700.00
31 Sidewalk Protective Fence, Vinyl-Coated Steel LF 0 $184.00 $0.00
32 Landscape Restoration SF 100 $35.00 $3,500.00
33 Miscellaneous Relocations LS 0 $0.00 $0.00
34 Grade Seperating Wall SF 0 $60.00 $0.00
Streetscaping Items
35 Flush Stamped Asphalt Median SY 0 $160.00 $0.00
36 Landscape Median Area SF 0 $8.50 $0.00
37 Hardscape Median Area SF 0 $19.00 $0.00
38 Street Trees EA 0 $800.00 $0.00
39 Pedestrian Scale Street Light EA 0 $14,300.00 $0.00
40 Vertical Banner EA 0 $425.00 $0.00
41 Subtotal Construction Cost Items 1 - 40 $285,190.00
42 Maintenance and Protection of Traffic Approx. 5% of Item 41 $15,000.00
43 Erosion and Sediment Control Approx. 2.5% of Item 41 $8,000.00
44 Mobilization Approx. 5% of Item 41 $15,000.00
45 Contingency Approx. 10% of Items 41 - 44 $33,000.00
46 Total Construction Cost Items 41 - 45 $356,190.00
47 Construction Inspection 15% of Item 46 $54,000.00
48 Total Construction + Inspection Items 46 - 47 $410,190.00
49 Engineering and Permitting Approx. 25% of Item 46 $90,000.00
50 Utilities LS 0 $0.00 $0.00
51 Right-of-Way Rough Estimate LS 1 $50,000.00 $50,000.00
52 Total Project Cost (2017 Dollars) Items 48 - 51 $550,190.00

Assumptions & Notes:

1. Assumes 2' of ground restoration (grading) on backside of proposed trail alignment.

Engineer's Conceptual Opinion of Cost for
Paoli Pike Corridor Master Plan Concepts 1 - 7
East Goshen Township, Chester County, PA

Estimate 5: Reservoir Road Path

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1 Clearing and Grubbing LS 1 $5,000.00 $5,000.00
2 Class 1 Excavation CY 230 $120.00 $27,600.00
3 Foreign Borrow CY 0 $75.00 $0.00
4 Grading (includes topsoil and seeding) SY 426 $15.00 $6,390.00
5 Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase) SY 0 $125.00 $0.00
6 Driveway Adjustments SY 0 $60.00 $0.00
7 Milling and Bituminous Overlay (including Tack Coat) SY 0 $25.00 $0.00
8 Plain Cement Concrete Curb LF 0 $45.00 $0.00
9 Plain Cement Mountable Curb LF 0 $50.00 $0.00
10 Drainage Upgrades LS 0 $0.00 $0.00
11 6" Base Drain LF 0 $13.00 $0.00
12 Guide Rail LF 0 $55.00 $0.00
13 Construction Surveying, Schedule, Equipment Package LS 1 $5,000.00 $5,000.00
14 4" Yellow Pavement Markings, Hot Thermoplastic Paint LF 0 $1.50 $0.00
15 4" White Pavement Markings, Hot Thermoplastic Paint LF 0 $1.50 $0.00
16 6" White Pavement Markings, Hot Thermoplastic Paint LF 0 $2.00 $0.00
17 24" White Pavement Markings, Hot Thermoplastic Paint LF 0 $8.00 $0.00
18 24" Yellow Pavement Markings, Hot Thermoplastic Paint LF 0 $8.00 $0.00
19 Marking Legend, "ONLY", Hot Thermoplastic Paint EA 0 $160.00 $0.00
20 Marking Legend, "ARROW", Hot Thermoplastic Paint EA 0 $160.00 $0.00
21 Marking Legend, "Shared Lane" EA 0 $450.00 $0.00
22 Signage EA 0 $150.00 $0.00
23 Overhead Lane Use Control EA 0 $15,000.00 $0.00
24 Pervious Pavement Path SY 405 $120.00 $48,600.00
25 Cement Concrete Sidewalk SY 0 $100.00 $0.00
26 ADA Accessible Curb Ramp EA 1 $6,500.00 $6,500.00
27 Traffic Signal Upgrades LS 0 $0.00 $0.00
28 Rapid Rectangular Flashing Beacon LS 0 $30,000.00 $0.00
Special Items
29 Post Construction Stormwater Management Approx. 10% of Total Construction LS 1 $15,000.00 $15,000.00
30 Split Rail Fence LF 0 $22.00 $0.00
31 Sidewalk Protective Fence, Vinyl-Coated Steel LF 0 $184.00 $0.00
32 Landscape Restoration Includes Tree Replacement SF 110 $35.00 $3,850.00
33 Miscellaneous Relocations LS 0 $0.00 $0.00
34 Grade Seperating Wall SF 0 $60.00 $0.00
Streetscaping Items
35 Flush Stamped Asphalt Median SY 0 $160.00 $0.00
36 Landscape Median Area SF 0 $8.50 $0.00
37 Hardscape Median Area SF 0 $19.00 $0.00
38 Street Trees EA 0 $800.00 $0.00
39 Pedestrian Scale Street Light EA 0 $14,300.00 $0.00
40 Vertical Banner EA 0 $425.00 $0.00
41 Subtotal Construction Cost Items 1 - 40 $117,940.00
42 Maintenance and Protection of Traffic Approx. 8% of Item 41 $10,000.00
43 Erosion and Sediment Control Approx. 2.5% of Item 41 $3,000.00
44 Mobilization Approx. 5% of Item 41 $6,000.00
45 Contingency Approx. 10% of Items 41 - 44 $14,000.00
46 Total Construction Cost Items 41 - 45 $150,940.00
47 Construction Inspection 15% of Item 46 $23,000.00
48 Total Construction + Inspection Items 46 - 47 $173,940.00
49 Engineering and Permitting Approx. 25% of Item 46 $38,000.00
50 Utilities LS 0 $0.00 $0.00
51 Right-of-Way Rough Estimate LS 1 $26,000.00 $26,000.00
52 Total Project Cost (2017 Dollars) Items 48 - 51 $237,940.00

Assumptions & Notes:

1. Assumes 2' of ground restoration (grading) on backside of proposed trail alignment.

Engineer's Conceptual Opinion of Cost for

Paoli Pike Corridor Master Plan Concepts 1 - 7

East Goshen Township, Chester County, PA

Estimate 6: Reservoir Road Shared Lane

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1Clearing and GrubbingLS0$0.00$0.00
2Class 1 ExcavationCY0$65.00$0.00
3Foreign BorrowCY0$75.00$0.00
4Grading (includes topsoil and seeding)SY0$15.00$0.00
5Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase)SY0$125.00$0.00
6Driveway AdjustmentsSY0$60.00$0.00
7Milling and Bituminous Overlay (including Tack Coat)SY0$25.00$0.00
8Plain Cement Concrete CurbLF0$45.00$0.00
9Plain Cement Mountable CurbLF0$50.00$0.00
10Drainage UpgradesLS0$0.00$0.00
116" Base DrainLF0$13.00$0.00
12Guide RailLF0$55.00$0.00
13Construction Surveying, Schedule, Equipment PackageLS0$7,500.00$0.00
144" Yellow Pavement Markings, Hot Thermoplastic PaintLF0$1.50$0.00
154" White Pavement Markings, Hot Thermoplastic PaintLF0$1.50$0.00
166" White Pavement Markings, Hot Thermoplastic PaintLF0$2.00$0.00
1724" White Pavement Markings, Hot Thermoplastic PaintLF0$8.00$0.00
1824" Yellow Pavement Markings, Hot Thermoplastic PaintLF0$8.00$0.00
19Marking Legend, "ONLY", Hot Thermoplastic PaintEA0$160.00$0.00
20Marking Legend, "ARROW", Hot Thermoplastic PaintEA0$160.00$0.00
21Marking Legend, "Shared Lane"EA30$450.00$13,500.00
22SignageEA18$150.00$2,700.00
23Overhead Lane Use ControlEA0$15,000.00$0.00
24Pervious Pavement PathSY0$90.00$0.00
25Cement Concrete SidewalkSY0$100.00$0.00
26ADA Accessible Curb RampEA0$6,500.00$0.00
27Traffic Signal UpgradesLS0$0.00$0.00
28Rapid Rectangular Flashing BeaconLS0$30,000.00$0.00
Special Items
29Post Construction Stormwater ManagementLS0$0.00$0.00
30Split Rail FenceLF0$22.00$0.00
31Sidewalk Protective Fence, Vinyl-Coated SteelLF0$184.00$0.00
32Landscape RestorationSF0$35.00$0.00
33Miscellaneous RelocationsLS0$0.00$0.00
34Grade Seperating WallSF0$60.00$0.00
Streetscaping Items
35Flush Stamped Asphalt MedianSY0$160.00$0.00
36Landscape Median AreaSF0$8.50$0.00
37Hardscape Median AreaSF0$19.00$0.00
38Street TreesEA0$800.00$0.00
39Pedestrian Scale Street LightEA0$14,300.00$0.00
40Vertical BannerEA0$425.00$0.00
41Subtotal Construction CostItems 1 - 40$16,200.00
42Maintenance and Protection of TrafficApprox. 8% of Item 41$2,000.00
43Erosion and Sediment Control$0.00
44MobilizationApprox. 5% of Item 41$1,000.00
45ContingencyApprox. 10% of Items 41 - 44$2,000.00
46Total Construction CostItems 41 - 45$21,200.00
47Construction Inspection15% of Item 46$4,000.00
48Total Construction + InspectionItems 46 - 47$25,200.00
49Engineering and PermittingApprox. 20% of Item 46$5,000.00
50UtilitiesLS0$0.00$0.00
51Right-of-WayLS0$0.00$0.00
52Total Project Cost (2017 Dollars)Items 48 - 51$30,200.00

Assumptions & Notes:

  1. Assumes routine clearing and trimming of vegetation and street sweeping, part of township routine maintenance
  2. Does not include speed enforcement or educational material

Engineer's Conceptual Opinion of Cost for
Paoli Pike Corridor Master Plan Concepts 1 - 7
East Goshen Township, Chester County, PA

Estimate 7: Goshenville Streetscape Enhancements

10/30/2017

Item No. Description Comment Unit Quantity Unit Cost Cost
Standard Items
1 Clearing and Grubbing LS 1 $25,000.00 $25,000.00
2 Class 1 Excavation CY 1,480 $65.00 $96,200.00
3 Foreign Borrow CY 296 $75.00 $22,200.00
4 Grading (includes topsoil and seeding) SY 1,280 $15.00 $19,200.00
5 Full Depth Bituminous Pavement + Wearing Course (8" Bituminous Base Course & 8" Subbase) SY 626 $125.00 $78,250.00
6 Driveway Adjustments SY 120 $60.00 $7,200.00
7 Milling and Bituminous Overlay (including Tack Coat) SY 0 $25.00 $0.00
8 Plain Cement Concrete Curb LF 2,510 $45.00 $112,950.00
9 Plain Cement Mountable Curb LF 0 $50.00 $0.00
10 Drainage Upgrades New Drainage Structures/Pipe LS 1 $120,000.00 $120,000.00
11 6" Base Drain LF 2,510 $13.00 $32,630.00
12 Guide Rail LF 200 $55.00 $11,000.00
13 Construction Surveying, Schedule, Equipment Package LS 1 $7,500.00 $7,500.00
14 4" Yellow Pavement Markings, Hot Thermoplastic Paint LF 0 $1.50 $0.00
15 4" White Pavement Markings, Hot Thermoplastic Paint LF 1,860 $1.50 $2,790.00
16 6" White Pavement Markings, Hot Thermoplastic Paint LF 0 $2.00 $0.00
17 24" White Pavement Markings, Hot Thermoplastic Paint LF 400 $8.00 $3,200.00
18 24" Yellow Pavement Markings, Hot Thermoplastic Paint LF 0 $8.00 $0.00
19 Marking Legend, "ONLY", Hot Thermoplastic Paint EA 0 $160.00 $0.00
20 Marking Legend, "ARROW", Hot Thermoplastic Paint EA 0 $160.00 $0.00
21 Marking Legend, "Shared Lane" EA 0 $450.00 $0.00
22 Signage EA 18 $150.00 $2,700.00
23 Overhead Lane Use Control EA 0 $15,000.00 $0.00
24 Pervious Pavement Path SY 1,500 $90.00 $135,000.00
25 Cement Concrete Sidewalk SY 80 $100.00 $8,000.00
26 ADA Accessible Curb Ramp EA 15 $6,500.00 $97,500.00
27 Traffic Signal Upgrades LS 1 $20,000.00 $20,000.00
28 Rapid Rectangular Flashing Beacon LS 0 $30,000.00 $0.00
Special Items
29 Post Construction Stormwater Management Approx. 10% of Total Construction LS 1 $280,000.00 $280,000.00
30 Split Rail Fence Resetting Existing Fence LF 250 $22.00 $5,500.00
31 Sidewalk Protective Fence, Vinyl-Coated Steel LF 50 $184.00 $9,200.00
32 Landscape Restoration Includes Trees/Shrubs SF 2,326 $35.00 $81,410.00
33 Miscellaneous Relocations LS 1 $25,000.00 $25,000.00
34 Grade Seperating Wall SF 225 $60.00 $13,500.00
Streetscaping Items
35 Flush Stamped Asphalt Median SY 800 $170.00 $136,000.00
36 Landscape Median Area SF 0 $8.50 $0.00
37 Hardscape Median Area SF 0 $19.00 $0.00
38 Street Trees EA 15 $800.00 $12,000.00
39 Pedestrian Scale Street Light Includes Conduit & Wiring EA 56 $14,300.00 $800,800.00
40 Vertical Banner EA 56 $425.00 $23,800.00
41 Subtotal Construction Cost Items 1 - 40 $2,188,530.00
42 Maintenance and Protection of Traffic Approx. 8% of Item 41 $176,000.00
43 Erosion and Sediment Control Approx. 2.5% of Item 41 $55,000.00
44 Mobilization Approx. 5% of Item 41 $110,000.00
45 Contingency Approx. 10% of Items 41 - 44 $253,000.00
46 Total Construction Cost Items 41 - 45 $2,782,530.00
47 Construction Inspection 12% of Item 46 $334,000.00
48 Total Construction + Inspection Items 46 - 47 $3,116,530.00
49 Engineering and Permitting Approx. 20% of Item 46 $557,000.00
50 Utilities Rough Estimate LS 1 $40,500.00 $40,500.00
51 Right-of-Way Rough Estimate LS 1 $90,000.00 $90,000.00
52 Total Project Cost (2017 Dollars) Items 48 - 51 $3,804,030.00

Assumptions & Notes:

1. Drainage upgrades subject to stormwater analysis during preliminary engineering

PROSPEROUS COMMUNITY, HEALTHY ENVIRONMENT

SUSTAINABLE PENNSYLVANIA

CERTIFIED COMMUNITY

SUSTAINABLE PENNSYLVANIA COMMUNITY CERTIFICATION

The Sustainable Pennsylvania Community Certification is intended to recognize local governments in Pennsylvania for deploying the policy and practice of sustainability for their communities' prosperity. Municipal managers/secretaries are invited to complete the on-line assessment.

There are 5 possible levels of certification achievement each having separate point and validation requirements. After certification has been claimed by the municipality and accepted by the Pennsylvania Municipal League, at the certification website, the public will be able to see all criteria with 'yes' answers.

The following is a summary of the possible certification levels with points and documentation requirements noted. Documentation is to be in a form of a weblink (URL) to material (documents, reports, case studies, statements, articles, other evidence, etc.) found on the municipality's website that demonstrates and evidences 'yes' responses. The weblinks to these materials will be visible to the public. As such, the weblinks facilitating building of a resource library of best practices and serve as a tremendous resource for local government.

Achievement Level and Points Documentation Requirements
Associate: 1–34 points Must provide web links to 10% of affirmative responses
Bronze: 35–79 points Must provide web links to 30% of affirmative responses
Silver: 80–135 points Must provide web links to 50% of affirmative responses
Gold: 136–202 points Must provide web links to 70% of affirmative responses
Platinum: 203–300 points Must provide web links to 90% of affirmative responses

CERTIFICATION CRITERIA

Topic # 131 Policies, Actions and Best Practices Points
Governance and Community Engagement
1Municipal Operations13
1AProfessional staff are employed or retained, in the areas of budgeting and finance.1
1BA revenue-expenditure trend analysis is conducted annually.1
1CFunds for capital-related borrowing are not used for day to day expenses.1
1DMunicipality routinely evaluates ability to ensure that revenue is sufficient to maintain public infrastructure, i.e., road, water, sewer, stormwater (community has an asset management based budget system).1
1EObligations for pensions/other post-employment benefits are funded for the long-term to at least 80%.3
1F5-10 percent of operating funds are carried over year to year.2
1GTaxation takes a balanced approach applicable to all sectors of municipal services provided and fees satisfy cost recovery.1
1HGreen vehicle fleet assessment has been initiated toward: using greener fuels and/or vehicles, vehicle right-sizing for the job/trip, retrofit or replace older diesel trucks or equipment with cleaner technology, or driver education about driving techniques for fuel economy.3
2Community Engagement12

1

2ACivic engagement, public participation and transparency are regularly assessed and facilitated.1
2BA Historic Review Commission is active.2
2CAn Environmental Advisory Council is active.2
2DMunicipality communicates with the public via a regularly scheduled newsletter or regularly updated web based communications.1
2EAll municipal-sponsored events have a sustainability-awareness component3
2FA program exists to actively pursue and match residents and local businesses to volunteer opportunities to better the community and assist the local government.3
3Local and Regional Cooperation5
3AMunicipality is an active participant in a Council of Governments.1
3BThe municipality utilizes Intergovernmental Cooperative Agreements (ICA) to engage in multi-municipal endeavors.2
3CIntergovernmental Cooperative Agreements include conflict resolution provisions.2
4Sustainability30
4AThe municipality is committed to passing a resolution (within six months of enrolling) to affirm participation in the Sustainable Community Essentials Certification Program.3
4BA municipal sustainability program (in name) has been developed and departmental goal setting and budget processes are used to advance it.4
4CSustainability policies, goals, and principles have been adopted.3
4DA sustainability assessment has been conducted to evaluate municipal facilities, operations, plans and regulations relative to conserving resources, saving money, and implementing policies and procedures that simultaneously advance the environment, economy, and social equity.4
4EThere is on-going training for municipal employees and officials and the HR function is closely engaged in advancing objectives of the municipal sustainability program.4
4FProcedures are in place to measure and track the impacts of the sustainability program (and yearly reporting to the public on results is conducted).4
4GAn executive/management level municipal staff person has responsibility for management of the municipal sustainability program expressly included in their job description.3
4HProfessional development for municipal personnel and officials includes participating (at a minimum, per year) in quarterly Local Government Academy, PA DCED or other professional training association programs.2
4INewly elected officials participate in Local Government Academy or other orientation training for public officials.3
5Public Safety6
5AMunicipality maintains updated public safety mutual aid agreements with neighboring municipalities and shares resources.1
5BMunicipality maintains an updated Public Safety comprehensive plan to be sure staffing and financial resources keep pace with municipal needs for Police, Fire, and Emergency Medical Services.2
5CMunicipality participates in a regional service program or contracts services to or through other municipalities for fire, police, or EMS.3
Healthy Communities
6Local Food9
6AIncentives exist for establishment of farms and gardens within the municipality.2
6BThe municipality supports a program (or cooperates with neighboring communities) to engage residents in strengthening sustainable food systems to link local foods, farms and people (ex. Buy Fresh Buy Local initiative, Good Food Neighborhood, etc.).3
6CEducation programs are made available for residents on the benefits of organic, locally-purchased food; farmers' markets and farm stands are facilitated.2
6DA community produce garden(s) is available.2
7Healthy People7

2

7APrograms by local government, or in cooperation with the non-profit and private sector, exist to address community health concerns, i.e. exercise programs, feeding programs for children and the elderly, crime watches, accessible health care, exercise away from areas of air pollution, etc.1
7BOutdoor recreation opportunities, amenities, and lifestyles are promoted.1
7CA program to promote safe walking to school is in place.3
7DThe use of pesticides and herbicides is being monitored and reduced by all municipal departments which use them2
Diversity, Equity and Inclusion
8Human Resources15
8AMeasures are taken to ensure a wide range of candidates are interviewed for all municipal job openings i.e., the Rooney Rule.2
8BThe municipality has a written municipal policy prohibiting discrimination and valuing diversity and inclusion.3
8CThe municipality has provided diversity training for municipal employees.3
8DThe municipality annually assesses, and reports to the public, diversity of all boards, employees, volunteers, committees, etc.3
8EThe municipality reports annually to the public on progress in creating a more diverse workforce.4
9Economy5
9AThere is a municipal policy ensuring Minority Business Enterprise and Women Business Enterprise are considered in municipal purchasing, bids and contracts.2
9BThe municipality is engaged in programs to communicate that the community is welcoming to persons who represent diversity (sister city relations, diversity sensitivity training, multilingual signage, etc.)3
Education
10Cooperation5
10AMunicipal planning is coordinated with the school district and the two meet together at least once per year.3
10BThe municipality and local public schools cooperate to share facilities and other resources. (For example, the municipality assists with the cost of evening lifeguards for community use of a school swimming pool or for provision of crossing guards.)2
11Engagement2
11AMunicipality works with schools and local nonprofits/community organizations to engage students about community issues such as waste reduction and recycling, public safety, wellness, conservation, nature, etc.2
Energy Use, Conservation and Green Building
12Municipal Energy Use24
12AThe municipality has recently completed an energy audit of all municipal buildings and operations. The audit includes findings and recommendations and establishes a baseline of energy usage.2
12BThe municipality has established goals from the energy audit findings and is methodically implementing the energy audit findings.3
12CMunicipal energy use has declined overall at least 15% from the baseline year established in the energy audit.4
12DMunicipality is reporting yearly to the public on progress and results made in implementing recommendations/findings contained in the municipal energy study.2
12EMunicipality has or is in the process of retrofitting street lights and traffic signals to LED bulbs.3

3

12FAs part of the energy audit, a greenhouse gas inventory and mitigation plan has been established for municipal functions.4
12GPositive progress on the greenhouse gas inventory and mitigation plan is reported annually to the public.3
12HEnergy performance of key municipal buildings is tracked using ENERGY STAR Portfolio Manager and is reported yearly to the public.3
13Community Energy Use8
13AThe municipal comprehensive plan contains an energy conservation element.1
13BMunicipal support is provided to a public program (throughout the community and for businesses) to conserve energy, promote renewable energy sources, and mitigate carbon emissions.3
13CThe greenhouse gas inventory has been expanded to include the entire community (not just the municipality) and a mitigation plan has been developed.4
14Green Buildings17
14AThere is a written green building policy/standard for new construction/major renovations of municipal buildings such as the International Green Construction Code (IgCC).3
14BNew construction and major renovations at municipal facilities incorporate (sufficient to achieve) LEED (Leadership in Energy and Environmental Design) Silver principles.3
14CMunicipal building operations could meet LEED O&M Silver principles or better.4
14DThe municipality has reviewed ordinances, resolutions, and other policies to remove impediments to the use of alternative energy (wind, solar, geothermal) installations or green buildings.3
14ELEED certification is required for development projects receiving a public incentive (TIF, abatement, etc.).4
15Renewable Energy7
15AMunicipality purchases energy for municipal facilities from renewable energy sources (or has installed renewable energy sources) such that at least 10% of all municipal energy comes from renewable sources.3
15BMunicipality purchases energy for municipal facilities from renewable energy sources (or installed renewable energy sources) such that at least 40% of all municipal energy comes from renewable sources.4
Environmental Stewardship
16Water Use, Conservation and Quality16
16AThe municipality utilizes an Integrated Municipal Stormwater and Wastewater Planning Approach (as described by EPA) to identify the municipality's priorities for projects and includes a description of how the proposed priorities reflect the relative importance of adverse impacts on human health and water quality and the municipality's financial capability. See: http://cfpub.epa.gov/npdes/integratedplans.cfm4
16BThe municipality actively encourages water conservation and efficiency measures in the community and among businesses.1
16CLow impact development and onsite stormwater infiltration is encouraged.1
16DWater provider(s) prioritize improving service to existing developed areas as opposed to opening up new areas to development.3
16EDrinking water and sanitary sewer rates are based on the real cost of providing service.3
16FSufficient investments are being made to the water, sewer, and stormwater systems per real costs and keeping pace with maintenance and operations.2
16GCooperation is occurring with neighboring municipalities to manage water and sewer supply, treatment and distribution, sewage and stormwater, in the most cost-efficient way.2
17Air Quality10
17APA State anti-idling law is enforced and compliance is promoted.2
17BMunicipality supports public education regarding reducing air pollution and emissions.1
17CA clean construction emissions policy for all publically subsidized projects has been adopted and is enforced.3

4

17DA burn ban has been formally adopted and made part of municipal ordinance, and State or County outdoor wood fired boiler construction and operation is in accordance with state law.2
17EThe municipality and its municipal waste hauler service are exploring ways to reduce emissions from vehicles and trucks beyond anti-idling.2
18Green Infrastructure11
18APolicies, plans and ordinances protect wetlands and waterways and their buffers.1
18BWritten policies exist and ordinances and incentives have been enacted to conserve environmentally and ecologically sensitive places (for example, slopes over 25%, slide prone soils and geology, springs and vernal pools, mature woodlands, Natural Heritage Areas, etc.) in order to protect public safety and natural resources while using green infrastructure for stormwater management.1
18CLow impact and green development projects, as well as techniques (pervious pavement, bioswales, cisterns, woodland and steep slope protection) are fostered through incentives, ordinances and design guidelines.3
18DTree and woodlands protection and management policies are in place (for example, community forestry plan and canopy goal; tree planting programs; tree maintenance programs; tree hazard and health assessment projects; computerized assessment of municipal trees, Tree/woodland replacement criteria in ordinances, etc.).3
18EA natural resource inventory has been developed for the community within the last 7 years as part of the comprehensive plan.1
18FSustainable landscape maintenance practices are in place for parks and municipal grounds.2
Housing
19Affordability13
19AThe zoning ordinance provides for or accommodates a full range of housing opportunities throughout the community.1
19BThe comprehensive plan addresses the community benefits of and need for expanding housing choice.2
19CThe zoning ordinance has inclusionary housing provisions/incentives3
19DA program exists (perhaps in partnership with an outside agency) to facilitate home ownership: homebuyer incentives, employer-assisted housing, community land trust, etc.3
19EThe community is tracking and reporting annually to the public on results toward affordable housing for residents.4
20Sustainable Neighborhoods11
20AA current inventory of vacant and blighted/blighting properties is maintained and mapped.2
20BA program is being implemented to put blighted, abandoned properties back into productive use: smart rehab code, conservatorship, demolition, acquisition, green lot strategies, etc.2
20CThe municipality has elected to administer and enforce PA's statewide Uniform Construction Code (UCC).1
20DThe municipality has adopted the International Property Maintenance Code within the last 6 years per good, safe rental housing.2
20EStaffing is in place sufficient to enforce building and maintenance codes.2
20FThe municipality utilizes a system for collection of delinquent taxes and fees in order to mitigate blight and abandonment.2
Land Use and Transportation
21Mobility13
21ATrails for walking and bicycling are being developed or maintained.1
21BAlternate transportation (e.g. transit, inter-modal, multi-modal, bicycle/pedestrian) are accommodated and promoted.2
21CPublic transportation and ride sharing are promoted and facilitated, as is transit-oriented development (where applicable).2

5

21DBicycle lanes or shared roadways are being developed and a "Share the Road" education campaign is being advanced.3
21EPolice are trained on the rights and responsibilities of bicyclists and state law on passing bicycles.2
21FTraffic calming techniques, "complete streets" projects, access management and congestion management programs have been evaluated and are being implemented.3
22Community18
22AProfessional staff are employed or retained to manage the land use program.1
22BComprehensive land use/development plan is current, addresses impacts to neighboring communities, and incorporates sustainability principles.2
22CA multi-municipal comprehensive plan has been adopted as has an official map.3
22DUp-to-date ordinances for zoning and subdivision/land development are in place to implement the comprehensive plan.1
22EThe comprehensive plan and ordinances promote pedestrian-oriented, dense, walkable, mixed-use development (in existing and proposed development), and redevelopment in the core or town center.4
22FA Transfer Development Rights (TDR) program is in place to incentivize development where infrastructure currently exists and to protect important green space.4
22GDevelopers are required to submit a comprehensive and detailed fiscal impact analysis including long-term fiscal impacts such as road repair, school infrastructure needs and other public services with their development applications.2
22HLand use and development decisions are assessed to ensure they do not have negative fiscal, stormwater, traffic, infrastructure, or service demands, or quality of life impacts on neighboring municipalities.1
23Green Space9
23AThe Comprehensive Plan identifies environmentally sensitive, ecologically significant, and civic/historic places.1
23BThe Comprehensive Plan and ordinances protect farmland and/or promotes community gardens and infill green space.2
23CThe Comprehensive Plan includes a parks/recreation and open space component with proposed passive or active greenways, parks and trails and the zoning and subdivision ordinances support the vision.1
23DThe greenspace/open space plan has benchmarks and results are reported annually to the public.4
23EThe municipality has a PA Dept of Agriculture Agricultural Security Area (ASA).1
Local Economy
24Thriving Local Green Business8
24AThe municipality has assessed Main Street program options and opportunities for possible applicability and implementation.1
24BOwners and tenants in the retail area are engaged with the municipality to provide attractive sidewalks, trees, and street furniture and make the area safe for pedestrians and bicyclists.1
24CThe municipality maintains and supports an initiative to encourage residents to buy local.2
24DMunicipal action plans for promoting minority and women-owned business are being advanced, including seeking proposals from the same for purchasing, services, etc.1
24EA program is in place to encourage businesses to be aware of innovate sustainable business approaches and to recognize achievement.3
25Material Use, Waste, and Recycling22
25AWaste and recycling ordinances and regulations are in compliance and enforced per Act 101, or if not a mandatory-Act 101 municipality, a municipal recycling program is conducted.2
25BThere is a curbside and/or drop-off recycling program.1
25CThe municipality contracts for solid waste collection as opposed to individual home owners contracting for the same.2

6

25DThere is a written waste reduction and recycling ordinance for residential, commercial and institutional facilities.2
25EThere is an active public informational program to encourage citizens to reduce waste and recycle.1
25FAll municipal buildings have an active recycling program.1
25GFor municipal facilities, a recent waste management assessment has been conducted with municipal employees trained in waste reduction and recycling.2
25HAn Environmentally Preferable Purchasing Program has been implemented for municipal operations.3
25IMunicipality has an active litter prevention/clean-up program.2
25JAn expanded material recycling program is being advanced, i.e., e-waste, composting, pharmaceuticals, and household hazardous waste for community-wide collection.2
25KA community-wide recycling program is maintained at 5% above the state stipulated goal of 35 percent.4
Other Sustainability Innovation
26Additional Initiative4
26AProvide an on-line link to description of a sustainability innovation that the Municipal Manager/Secretary feels strongly is deserving of additional recognition and is not covered by any of the above criteria options.2
26BProvide an on-line link to description of a second sustainability innovation that the Municipal Manager/Secretary feels strongly is deserving of additional recognition and is not covered by any of the above criteria options.2

Grand Total Points 300

7