Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
1. Call to Order (7:00 PM) 2. Pledge of Allegiance
AGENDA EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, April 23, 2019
7:00 PM
3. Moment of Silence - Supervisor Carmen Battavio 4. Announce that the meeting is being recorded 5. Chairman's Report (7:05 PM to 7:10 PM) 6. Public Comment on non-agenda items-30 minutes (7:10 PM to 7:40 PM) 7. Emergency Services Reports a. WEGO b. Goshen Fire Co - March c. Malvern Fire Co d. Good Fellowship - March e. Fire Marshal 8. Financial Report -April 5, 2019 9. Approval of Minutes and Treasurer's Report (7:40 PM to 7:45 PM) a. Minutes - April 2, 2019 April 9, 2019 b. Treasurers Report -April 18, 2019 10. Public Hearings -Consider an amendment to Chapter 225 Titled "Vehicles and Traffic" prohibiting parking on the west side School Lane between Old West Chester Pike and Center Street (7:45 PM to 8:00 PM) 11. Old Business a. Consider Comments from Chester County Planning Commission on Draft Business
Incubator Ordinance (8:00 PM to 8:05 PM) 12. New Business a. Vacancy Board Meeting - Consider appointment of Tax Collector (8:05 PM to 8:10 PM) b. Presentation of Land Development Application Approval -Ducklings Leaming Center (8:10 PM to 8:30 PM) c. Presentation on Chester County Annual Report Summary (8:30 PM to 8:40 PM) d. Acknowledge receipt Rossmore Homeowners Association Escrow Reduction letter (8:40
PM to 8:45 PM) e. Consider recommendation on Boot Road Restriping Project (8:45 PM to 8:50 PM) f. Consider recommendation on Emergency Communications Ordinance (8:50 PM to 8:55 PM) g. Consider Goshen Parkway Sidewalk concept plan meeting (8:55 PM to 9:00 PM h. Consider Tar Buggy Purchase (9:00 PM to 9:05 PM)
1. Consider Tractor/Mower Replacement (9:05 PM -9: 10 PM) j. Acknowledge receipt of the final draft of West Goshen Township's Comprehensive Plan
Update (9:10 PM-9:15 PM)
AGENDA Page -1- APRIL 23, 2019
13. Any Other Matter 14. Continued Public Comment on non-agenda items - if necessary 15. Liaison Reports - none 16. Correspondence, Reports oflnterest (9: 15 PM to 9:20 PM) a. PennDOT Agreement for Incorporated Work b. PennDOT Applications for Traffic Signal Approvals c. TND Overlay Memo d. First Quarter 2019 Right to Know Report 17. Adjournment (9:20 PM)
Meetings & Dates of Importance
Apr 25, 2019 May 1, 2019 May 2, 2019 May 2, 2019 May 7, 2019 May 8, 2019 May 9,2019 May 13, 2019 May 14, 2019 May 16, 2019 May 17, 2019 May 20, 2019 May 21, 2019 May 23, 2019 May 27, 2019 May 29, 2019
Pipeline Task Force Planning Commission P&R Volunteer Open House Park and Rec Commission Board of Supervisors Conservancy Board Historical Commission Municipal Authority
Board of Supervisors Futurist Commission Pension Committee Sustainability Advisory Committee Election Day (no meeting) Pipeline Task Force Office Closed for Memorial Day Long Range Planning Session
Newsletter Deadline for Summer of 2019: May 1st
05:00pm 07:00pm 06:00pm 07:00pm 07:00pm 07:00pm 07:00pm 07:00pm 07:00pm 07:00pm 10:30am 07:00pm
05:00pm
10:00am
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant.
Public Comment - Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an oppo1tunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting. The Board of Supervisors will allocate a maximum of 30 minutes for public comment at the beginning of each meeting. If necessary there will be a second period for public comment prior to the end of the meeting.
Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to
AGENDA Page -2- APRIL 23, 2019
stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org. and click the "£-notification & Emergency Alert" button on the left side of the homepage.
ReadyChesco - Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!
Smart 911 - Smart 911 is a new service in Chester County that allows you to create a Safety Profile at www.smart911.com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would
not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members' allergies or specific medical conditions. And police can access a photo of a missing family member in
seconds rather than minutes or hours, helping the search start faster.
F:\Data\Shared Data\Agcndas\Board of Supervisors\2019\2019-04-23 _Board of Supervisors Agenda with timev2.doc
AGENDA Page -3- APRIL 23, 2019
Goshen Fire Company Monthly Operations Report March 2019
Fire Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total - fire
Fire Police Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total - Fire Police
EMS Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total- EMS
Total Responses per Municipality
East Goshen West Goshen Westtown Willistown Other Total - Goshen Fire Company
Monthly Responses
24 13 9 3 4 53
Monthly Responses
13 10 6 6 2 37
Monthly Responses
297 120 28 61 3 509
Monthly Responses
334 143 43
70
9 599
Monthly Manhours
64 24 17 4 10 119
Monthly Manhours
18 10 4 8 6 46
Monthly Manhours
297 120 28 61 3 509
Monthly Manhours
379 154 49 73 19 674
YTD Responses YTD Manhours 70 173 30 60 20 47 14 29 13 138 147 447
YTD Responses YTD Manhours 40 64.9 25 40.2 16 16.6 16 29.8 9 25.4 106 176.9
YTD Responses YTD Manhours 673 880 272 325 87 113 113 145 76 9 1221 1472
YTD Responses YTD Manhours 783 1118 327 425 123 177 143 204
98 172 1474 2096
Goshen Fire Company Monthly Operations Report March 2019
Monthly Updates
Key Indicators Patients Treated Patients 65 and Over EMS Calls to Assisted Living and Retirement Facilities Automatic Fire/CO Alarms
Major Incidents !Assist WCFD with Building Fire - 215 N Everhart St
Events !Station 56 received unit citation for Rt 202 Accident in EW
Fundraising Activities Breakfast Buffet Ambulance Subscription Campaign Business Contribution Campaign Easter Flower Sale • Station 56
Personnel Updates One career FF/EMT on Medical Leave Completed contract negotiations with Firefighter's union
Apparatus Updates !None
267 194 142 21
3/31/2019
3/18/2019
3/24/2019 In progress
In progress
4/19-4/21
133 weeks 3/12/2019
73% 40% 40%
AMBULANCE & EMS Training Institute: Good Fellowship
March 2019 Operations Report
Logo showing an ambulance and Star of Life emblem.
Municipality Count West Chester 153 West Goshen 135 East Goshen 69 Westtown 44 East Bradford 37 West Whiteland 25 West Bradford 21 Thornbury 14 Birmingham 6 Willistown 4 Concord, Delco 2 Pennsbury 2 Coatesville 1 Downingtown 1 Kennett 1 Middletown, DelCo 1 Pocopson 1
21
15 12
Call Volume
% of Calls
29.6% --· 26.1% -- OA" ... " 13.3% o;- ,.,.. 8.5% .,,.. ..... 7.2% ..,,.
WHI trtdtof• 4.8%
4,1"
4.1% 2.7% 1.2% 0.8% 0.4% 0.4% 0.2% 0.2% 0.2% 0.2% 0.2%
Non-Transport Breakdown
Refusal 56 Recalled Enroute 35 Recalled On Scene 40 No Services 40 Lift Assist 7 DOA 5 Released to BLS 3 External ALS Assist 0 186
Total Call Volume By Hour
33 37 35 33
25 26
18 19
--- ,.Mibwy COltuvftle "·"' o.•" ....
IC•MWtt ..,,.
Midft.io.ft .. ,,. - ..,,.
34 29 30 25
19 17 18 17
Call Volume by Vehicle Ambulance SSA 41 Ambulance 55B 1 Ambulance SSC 161 Ambulance 55D 6 Ambulance SSE 49 Ambulance SSF 148 Medic SSA 84 MedicSSB 27
41
l -
Call Volume by Vehlcle
161 148
84
49 I
27
6 I II 0 .., _,_ 0 0 .,.,.,. !,fl, !,(, !,<) !, .. .,.,.,. !,fl, /' .:" .... .,,,. .,,,. ., ..
<; ,!, .. ,..,.4-' ,.. .. .,:,<" .,:, ,..,.4-' .,.,,<f 517 ;$>.:; ;$>.:; ;$)"' ;$)
"' ;$)
"' ,,1$ t; .j> ./' ./' ./' ./' ./'
Hospital Destination Information
Disposition Total Chester County Hospital 259 No Transport 186 Paoli Hospital 61 Paoli Hospital (Trauma Alert) 6 Brandywine Hospital 2 Riddle Hospital 2 Nemours Al du Pont Hospital 1
517
Transported: 331
No Transport: 186
% 50.1% 36.0% 11.8% 1.2% 0.4% 0.4% 0.2%
64.0% 36.0% 517 .._ _ ___________________ __, PHIIHotplt•t(Tr:aumaAlen)
1.2"
Brandywine Hospital
0.4"
Riddle Hospital
o.•"-
Ncmours Al duPont Kosplt1I
0.2"
0 -
'I.-
Miscellaneous Call Information
Call Types Sick Person 60 11.6% Respiratory Difficulty 59 11.4% Fall/ Lift Assist 52 10.1% Covering Other Agencies Accident- BLS 25 4.8% Organization Covers Chest Pain 25 4.8% Goshen Fire Co 24 Overdose 24 4.6% Longwood Fire Co 4 Stand By- Fire 24 4.6% Uwchlan Ambulance 3 Injured Person 23 4.4% Riddle Hospital EMS 2 Stroke/CV A 22 4.3% Concordville Fire Co 1 Emotional Disorder 20 3.9% Malvern Fire Co 1 Syncope 20 3.9%
Minquas Fire Co 1 Abdominal Pain 18 3.5%
Washington Hose Co EMS 1 Heart Problems 15 2.9% Seizures
15
2.9% 37 Hemorrhaging 13 2.5% Unresponsive Person 12 2.3% Unconscious Person 11 2.1% Diabetic Emergency 10 1.9% Hypo Tension 9 1.7% Alarm - Medical BLS 8 1.5% Allergic/ Medication Reaction 7 1.4% Hyper Tension 7 1.4% Cardiac /Resp Arrest 5 1.0% DOA 4 0.8% Accident - Entrapment 3 0.6% Back Pain 3 0.6% Fractures 3 0.6% Maternity/ Labor Pain 3 0.6% Neurological/ Head Injury 3 0.6% Average Times Accident - ALS 2 0.4% Dispatch To En route 1.44 Choking 2 0.4% En route To On Scene 6.53 Standby 2 0.4% On Scene Time 14.28 Unknown Nature 2 0.4% Transport Time 10.56 Accident- Pedestrian 1 0.2% Dispatch To Available 40.74 Alarm - Carbon Monoxide 1 0.2% Assault 1 0.2% Exposure to Heat/ Cold 1 0.2% Laceration 1 0.2% Shooting 0.2%
Memo
To: Board of Supervisors From: Jon Altshul Re: March 2019 Financial Report Date: April 5, 2018
As of March 31st, net of pass throughs, the general fund had revenues of $3,680,808 and expenses of $2,737,594 for a year-to-date surplus of $943,215. Compared to the year-to-date budget, revenues were $58,565 under budget, and expenses were $33,184 under budget for a negative budget variance of $25,380. As of March 31'1, the general fund balance was $6,306,832.
On the expense side, Administration is $30,005 over budget due primarily to funding the pension plan obligation monthly, rather than in one lump sum. Parks & Recreation was over-budget by $15,337 due to the environmental remediation work abutting a private residence on Highland Avenue, for which we were made whole by the property owner's insurance company in early April (this revenue will be reflected in next month's report). All other departments were under budget.
On the revenue side, Real Estate Transfer Tax is now $24,518 under-budget due to slow real estate activity in the winter; I expect that to pick up in the months ahead. Earned Income Tax and Local Services Tax were both slightly under-budget as well, but still reasonably close to targeted levels. Other income (interest) continues to perform well.
Other funds
• The State Liquid Fuels Fund had $564,622 in revenues, reflecting the annual allocation that was received in early March and $0 in expenses. The fund balance is $566,393. • The Capital Reserve Fund had $21,686 in revenues and $41,682 in expenses. The fund balance was $5,939,863. • The Transportation Fund had $2,653 in revenues and $418 in expenses. The fund balance was
$1,090,681. • The Sewer Operating Fund had $853,666 in revenues and $761,270 in expenses. The fund balance was $1,041,339. • The Refuse Fund had $269,946 in revenues and $266,024 in expenses. The fund balance was $671,071. • The Bond Fund had $36,479 in revenues and $141,674 in expenses. The fund balance was
$6,263,113. • The Sewer Capital Reserve Fund had $4,124 in revenues and $16,023 in expenses. The fund balance is $2,241,693. • The Operating Reserve Fund had $3,911 in revenues and no expenses. The fund balance is $2,549,316.
Accounts Receivable
Utilities accounts receivable ticked up slightly from last quarter ($173,177 v. $167,324), but is still well below historical averages. Meanwhile, real estate tax receivables are below historical Ql levels.
Cash Management The average weighted yield on all cash across all Township funds is 2.27%, which is nominally higher
than three months ago. However, the average time until maturity on illiquid investments has fallen to 85
days. The reason for this is that the rates on liquid investments through PLGIT are only nominally lower than rates on 12 month CDs. As a result, over the past few months, I've been rolling maturing investments into liquid accounts.
ccount Title
EMERGENCY SERVICES EXPENSES PUBLIC WORKS EXPENSES
ADMINISTRATION EXPENSES CODES EXPENSES PARK AND RECREATION EXPENSES TOTAL CORE FUNCTION EXPENSES
EMERGENCY SERVICES REVENUES PUBLIC WORKS REVENUES ADMINISTRATION REVENUES CODES REVENUES PARK AND RECREATION REVENUES TOTAL CORE FUNCTION REVENUES
NET EMERGENCY SERVICES NET PUBLIC WORKS NET ADMINISTRATION NET CODES NET PARK AND RECREATION jCORE FUNCTION NET SUBTOTAL
DEBT - PRINCIPAL DEBT - INTEREST jTOTAL DEBT
I TOTAL CORE FUNCTION NET
NON-CORE FUNCTION REVENUE
EARNED INCOME TAX REAL ESTATE PROPERTY TAX REAL ESTATE TRANSFER TAX CABLE TELEVIS.FRANCHISE LOCAL SERVICES TAX OTHER INCOME
!TOTAL NON CORE FUNCTION REVENUE
NET RESULT
EAST GOSHEN TOWNSHIP GENERAL FUND SUMMARY
As of March 31, 2019
2019 2019 Annual Budget YTD Bud et
4,290,164 1,370,540 2,633,542 601,305 1,834,626 516,935 584,909 144,983 782,875 115,277 10,126,116 2,749,040
81,901 8,500 1,003,167 128,806 314,323 58,727 258,770 55,842 134,735 21,731 1,792,896 273,606
4,208,263 1,362,040 1,630,375 472,499 1,520,303 458,208 326,139 89,141 648,140 93,546 8,333,220 2,475,434
574,000 226,399 21,738 800,399 21,738
9,133,619 2,497,172
5,191,400 1,249,034 2,039,429 1,852,140 585,000 146,250 450,000 112,500 348,000 84,315 519,790 21,528
9,133,619 3,465,767
0 968 595
2019 $ YTD Actual Variance
1,364,279 {6,262) -0.5% 557,881 {43,424) -7.2% 526,074 9,139 1.8% 131,357 (13,626) -9.4% 136,268 20,991 18.2% 2,715,858 (33,182) -1.2%
5,822 (2,678) -31.5% 129,243 437 0.3% 37,860 {20,867) -35.5% 42,369 {13,473) -24.1% 27,385 5,654 26.0% 242,679 (30,927) -11.3%
1,358,456 (3,584) -0.3% 428,638 (43,861) -9.3% 488,213 30,005 6.5% 88,988 {153) -0.2% 108,883 15,337 16.4% 2,473,179 {2,255) -0.1%
0 #DIV/01 21,736 (2) 0.0% 21,736 (2) 0.0%1
2,494,914 (2,258) -0.1%1
1,223,675 (25,359) -2.0% 1,862,485 10,345 0.6% 121,732 (24,518) -16.8% 113,480 980 0.9% 83,039 (1,276) -1.5% 33,719 12,191 56.6%
3,438,129 (27,638) -0.8%1
943,215 (25,380) 0
01/01/19 BEGINNING BALANCE
TS RECEIP 310 320 330 340 350 360 380 390
EXPEN 400 410 420 426 430 450 460 470 480 490
TAXES LICENSES & PERMITS FINES & FORFEITS INTERESTS & RENTS INTERGOVERNMENTAL CHARGES FOR SERVICES MISCELLANEOUS REVENUES OTHER FINANCING SOURCES
DITURES
GENERAL GOVERNMENT PUBLIC SAFETY HEAL TH & WELFARE SANITATION & REFUSE HIGHWAYS.ROADS & STREETS CULTURE-RECREATION CONSERVATION & DEVELOPMENT DEBT SERVICE
MISCELLANEOUS EXPENDITURES OTHER FINANCING USES
2019 SURPLUS/(DEFICIT)•
CLEARING ACCOUNT ADJUSTMENTS
02128/2019 ENDING BALANCE
U:\.IAlt$bl\Ouartwfrt reoons\01 2019\2019-oJ IJ Ftnis Sun!NNJdsx
SUMMARY OF FUNDS REPORT (AKA "JOE REPORT1
ALL FUNDS MARCH 31, 2019 • NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
GENERAL LIQUID FUELS CAPRESV TRANSPORT SEWER OP. REFUSE FUND• STATE FUND FUND FUND FUND FUND
$5,689,163 $1,771 $5,959,859 $1,088,446 $948,943 $667,149
$3,305,409 so $0 so so so $114,000 so so $0 $0 $0 $11,222 $0 $0 $0 $0 $0 $55.487 ($385) $21.686 $2,653 $4,348 $3,264 $50 $565,007 $0 $0 $0 so $73,522 so $0 so $849,317 $266,681 $14,620 $0 $0 so so $0 $126,894 so $0 $0 so $0
$3,701,205 $564,622 $21,686 $2,653 $853,666 $269,946
$348,387 so $29,202 $0 $0 $0 $1,878,620 $0 $0 $0 $0 $0 $39,688 $0 $0 $0 $0 $0 $0 $0 $0 so $576,263 $266,024 S443,507 so $6,125 $418 $0 so $125,435 so so $0 $0 so $530 $0 SS,355 so $0 $0 $22,454 $0 $0 $0 $80,511 $0 $360,315 $0 $0 $0 $0 $0 so $0 so $0 $104,496 $0
$3,218,934 so $41,682 $418 $761,270 S266,024
$482,270 $564,622 ($19,996) $2,235 $92,396 $3,921
$135.400
$6,306,832 $566,393 $51939,863 $1,090,681 $1,041,339 $671,071
Page 1 of 1
SEWER CAP OPERATING TOWNSHIP MUNICIPAL BONO RESVFUND RESERVE FUNDS AUTHORITY FUND
$2,253,592 $2,545,404 $19,154,328 $25,923 $6,368,308
so so SJ,305,409 so $0 $0 so $114,000 $0 $0 $0 $0 $11,222 $0 $0 $4,124 $3,911 $95,089 (S28) $36,479 $0 $0 $565,057 so so $0 $0 S1,189,521 $846 so so so $14,620 S424 $0 $0 $0 $126,894 $120,519 $0
$4,124 $3,911 $5,421,812 $121,761 $36,479
$0 $0 $377,588 so so $0 $0 $1,878,620 $0 $0 $0 $0 $39,688 $0 $0 $0 $0 $842,287 $134,264 $0 $0 so S450,049 so $0 so $0 $125,435 so S141,674 so
$0
$6,885 so $0 $0 $0 S102,965 $0 $0 $0 $0 $360,315 $0 $0 $16,023 $0 $120,519 $0 so
$16,023 $0 $4,304,351 S134,264 $141,674
($11,899) $3,911 S1,117,461 ($12,502) ($105,195)
$2,241,693 $2,549,316 $20,407,188 I $13,421 $6,263,113
41Gno1g
1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, APRIL 2, 2019 5 DRAFT MINUTES 6 7 Present: Chairwoman Janet Emanuel; Vice-Chairman Marty Shane; Members David 8 Shuey and Mike Lynch; Township Manager Rick Smith; Assistant Township Manager 9 and Finance Director Jon Altshul; Bill Wegemann and Judi DiFonzo (Pipeline Task 10 Force). 11 12 Call to Order & Pledge of Allegiance 13 Janet called the meeting to order at 7:05 p.m. and led the pledge of allegiance. 14 15 Moment of Silence 16 Janet called for a moment of silence to honor our troops. 17 18 Recordine 19 The meeting was livestreamed on the Township's YouTube page. 20 21 Chairman's Report 22 Janet reported that the Board met in Executive Session prior to tonight's meeting to 23 discuss a personnel matter. She stated that this month is Pennsylvania Safe Digging 24 Month and reminded residents to call 811 before digging for any home 25 improvement or landscaping project. She also noted that Saturday, April 13th is 26 "Keep East Goshen Beautiful Day" and invited residents to come to the Township 27 building between 8am and 9am to register and pick up supplies. Both David and 28 Mike expressed their support for this event and its importance to the Township. 29 David asked whether the Township could increase fines for littering, to which Rick 30 stated that the fines are set by state law. Marty suggested that Blosenski clean up 31 the northern portion of Route 352. 32 33 Public Comment 34 None 35 36 Approval of Minutes and Treasurer's Report 3 7 David made a motion to approve the minutes of March 19, 2019, as corrected. Marty 38 seconded. The motion passed 4-0. Mike made a motion to approve the Treasurer's Report 39 of March 28, 2019. David seconded. The motion passed 4-0. 40 41 Acknowled2e Receipt of the Concise Statement of Assets, Liabilities and Fund 42 Balance 43 The Board acknowledged receipt of the Concise Statement of Assets, Liabilities and 44 Fund Balance for the year ending December 31, 2018. Jon explained that the $615,539 45 decline is fund balance was due to the Township spending down the proceeds of the 2017 46 bonds, and that otherwise the Township had a positive year financially.
4/2/19 April 2, 2019 1
1 2 3 Consider Recommendation on Draft Business Incubator Ordinance 4 Jon stated that staff had reviewed the comments from the Chester County Planning 5 Commission and was recommending only minor changes to the draft ordinance in 6 response. Mike questioned why the Township would require an incubator to go 7 through the conditional use process if all the uses were permitted by right. Jon 8 explained that staff was concerned about how the Use & Occupancy permitting 9 process would be administered when there's a change of tenant if the incubator 10 hadn't originally gone through the conditional use process. Mike also expressed 11 concern about whether the ordinance should provide for more flexibility around 12 parking requirements. Jon stated that the parking requirements are there to prevent 13 overcrowding, but he agreed to follow up with the County Planning Commission to 14 get more information about the County's rationale with that comment. 15 16 Consider Recommendation on Fugitive Dust Testing 17 David made a motion to engage Pennoni per the terms and conditions of their proposal to 18 monitor one HDD pipeline drilling site that is determined by East Goshen Township staff 19 and Pennoni engineers as the most impacted to measure fugitive dust during drilling; and 20 if the reading exceeds the ppm as codified in the relevant regulations, that we approve the 21 expense to determine the contents of that fugitive material. Mike seconded the motion. 22 23 Bill stated that he has been concerned about drilling dust and more specifically what's in 24 the dust for over a year, but that DEP has told him there's nothing they can do. 25 26 Marty noted that he is concerned about 24 hour drilling and about when Sunoco will ask 27 the Township for permission to drill around the clock. 28 29 The motion passed 4-0. 30 31 Consider Recommendation for Mower Replacement 32 Janet explained that Public Works has requested to replace two radius mowers that have 33 fully depreciated and for which the Township budgeted $18,000 this year. The Township 34 received the following two COSTARS pricing proposals: 35 36 • Conway Power Equipment; 2 ExMark Mowers: $16,119.40 (with trade-in) 37 • Power Pro Equipment; 2 Hustler Super Z 60": $18,898.80 (with trade-in) 38 39 Mike made a motion to purchase the two ExMark mowers from Conway Power 40 Equipment for $16,119.40 with trade in. Marty seconded. The motion passed 4-0. 41 42 Any Other Matter 43 Mike made a motion to extend the contract with Chester County for the grant for 44 Segments F & G of the Paoli Pike Trail through October 21, 2019. David seconded. The 45 motion passed 4-0. 46
4/2/19 April 2, 2019 2
1 Public Comment 2 Lex Pavlo, 611 S. Speakman Lane, suggested that the Board of Supervisors write a letter 3 to District Attorney Tom Hogan to raise concerns that Sunoco may begin 24-hour drilling 4 without Township approval. He also noted that his temporary construction easement with 5 Sunoco expires after two years and asked the Township for clarification about when 6 Sunoco began drilling at the Bow Tree site. Rick stated that the Township does not have 7 any specific record of when drilling at that site began. 8 9 Ron Cocco, 633 . Speakman Lane, asked whether a barrier would be installed at Bow 10 Tree across from the New Kent drilling site or when drilling would begin there. Rick 11 stated that he did not know. 12 13 Bernie Greenberg, 894 Jefferson Way, asked about the penalty that Sunoco would incur 14 for drilling 24 hours per day without getting Township approval. Rick stated that the 15 fines are determined by state law and are generally capped at $1,000 per day. 16 17 Brian Sweet, 646 Meadow Drive, asked why the Township would consider allowing 18 Sunoco to drill 24 hours a day. Rick explained that if Sunoco doesn't drill 24 hours a day 19 when they start pulling pipe, there's a risk that bore holes could collapse overnight, which 20 would require Sunoco to redrill, and thereby substantially prolong the amount oftime that 21 the drilling operation would last. 22 23 Correspondence. Reports of Interest 24 The Board acknowledged receipt of the following three reports of interest: 25 • March 15, 2019-Notice of Township's intent to apply for a PADEP General 26 Permit 11 to replace the Access Road (Trail) Bridge in the Applebrook Park. 27 • March 18, 2019 - Notice of Adelphia Gateway's intent to apply for a P ADEP 28 General Permit (ESCGP-3) for the Adelphia Gateway Pipeline Project 29 • March 26, 2019-Notice of Township's intent to apply for a PADEP General 30 Permit 7 for the Cornwallis Drive Emergency Access Road. 31 32 Adjournment 33 Mike made a motion to adjourn at 8:10. David seconded. The motion passed 4-0.
34 35 Respectfully submitted, 36 Jon Altshul 37 Recording Secretary 38 39 Attached: March 28, 2019 Treasurer's Report 40
4/2/19 April 2, 2019 3
TREASURER'S REPORT March 15 - March 28, 2019 RECEIPTS ANO BILLS (ALL 2019 UNLESS OTHERWISE NOTED)
!GENERAL FUND
Real Estate Tax $434,461.51 Accoll tS Payable $146,820.35 Earned Income Tax $26,400.00 !;lectronic Pm!â: Local sel'\lice Tax $600.00 Credit Card $3,995.32 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned -$22.18 Debt Service $7,484.50 Total Other Revenue $32,183.74 Payroll $121,060.34
Total General Fund Receipts: $493,623.07 Total Expenditures: $279,360.51
!STATE LIQUID FUELS FUND
Receipts S0.00 Accounts Payable $0.00 Interest Earned S0.00 Total State Liqud Fuels Receipts: $0.00 Total Expenditures: $0.00
lcAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $9,023.98 Interest Earned $3,348.62 Credit Card $0.00 Total Capital Reserve Fund Receipts: $3,348.62 Total Expenditures: $9,023.98
!TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Transportation Fund Receipts: $0.00 Total Expenditures: $0.00
lsEWER OPERATING FUND
Receipts $30,563.91 Accounts Payable $134,794.92 Interest Earned $11.09 Credit Card $0.00 Debt Service $26,837.08 Total Sewer Operating Fund Receipts: $30,575.00 Total Expenditures: $161,632.00
!REFUSE FUND
Receipts $9,468.92 Accounts Payable $32,999.65 Interest Earned $11.09 Total Refuse Fund Receipts: $9,480.01 Total Expenditures: $32,999.65
IBONO FUND
Receipts S0.00 Accounts Payable $53,955.01 Interest Earned S0.00 Total Bond Fund Receipts: $0.00 Total Expenditures: $53,955.01
lsEWER CAPITAL RESERVE FUND
Receipts S0.00 Accounts Payable $0.00 Interest Earned S0.00 Total Sewer Capital Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
!OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned S0.00 1 Total Operatin9 Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
4/2/19 April 2, 2019 4
1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, APRIL 9, 2019 5 DRAFT MINUTES 6 7 Present: Chairwoman Janet Emanuel; Vice-Chairman Marty Shane; Members 8 Carmen Battavio, David Shuey and Mike Lynch; Township Manager Rick Smith; 9 Assistant Township Manager and Finance Director Jon Altshul; Township Solicitors 10 Kristin Camp and Kim Venzie; Planning Commission members Brad Giresi, Dan 11 Daley and Ernie Harkness; Erich Meyer (Conservancy Board). 12 13 Call to Order & Pledge of Allegiance 14 Janet called the meeting to order at 7:00 p.m. and asked Chase, a local Boy Scout, to 15 lead the pledge of allegiance. 16 17 Moment of Silence 18 Carmen called for a moment of silence to honor our troops. 19 2 o Recording 21 Janet announced that due to a change in YouTube's livestreaming policies, the 22 meeting would not be livestreamed, but would be uploaded tomorrow onto the 23 Township's YouTube page. 24 25 Chairman's Report 26 Janet reported that the Board met in Executive Session prior to tonight's meeting to 27 discuss a personnel matter. She stated that the Vacancy Board will meet on April 23, 28 2019, to consider the appointment of a Tax Collector. Finally, she noted that Jim 29 McRee had resigned from the Planning Commission and that an announcement 30 about the vacancy would be on the website shortly. 31 32 Public Comment 33 Mark Ann Kusner, 1026 Kennett Way, read a prepared statement regarding her 34 safety concerns about the Sunoco pipelines. In particular, she expressed concern 35 about Sunoco's use of single walled pipes and the potential for corrosion as a result 36 of the pipes being left out above ground for the past two years. She stated that 37 Sunoco should be required to use double walled pipes. Ms. Kusner also asked 38 whether the Township could regulate vibrations, to which David said that the 39 matter had been explored, but that it is very difficult to reliably measure vibrations. 40 She also asked about the hours that Sunoco can drill, to which Rick responded that 41 the Township's ordinance allows construction work between 7am and 10pm daily. 42 43 Bernie Greenberg, 894 Jefferson Way, asked whether Sunoco plans to drill 24 hours 44 a day. Marty explained that the supervisor of the entire Mariner East project had
45 told him that Sunoco does not plan to ask East Goshen for permission to drill 24 46 hours a day, but if that did happen, the Township would hold a public meeting on
4/2/19 April 2, 2019 1
1 the matter. Marty added that the risk of not allowing 24-hour drilling is that bore 2 holes could collapse overnight, which would prolong the amount of time that 3 Sunoco needs to drill in East Goshen. 4 5 Consider Recommendation on 2019 Sewer Rates 6 Jon recommended that the Township amend its sewer rates for the final three quarters of 7 2019 and the fust quarter of 2020 to $33.74 fixed and $8.42 per thousand gallons 8 variable. At this rate, the average sewer bill for a single family home would be $146.0 I 9 per quarter, down from $148.37 cur ently. He noted that residential water use fell over 10 the past 12 months, but that commercial use has increased. He also noted that as part of 11 this amendment, he was recommending that the fee schedule reflect the increase in East 12 Whiteland's variable rate to $6.20 per thousand gallons, as the Township recharges 13 Malvern Institute for sewer bills received from East Whiteland. 14 15 Carmen made a motion to adopt Resolution 20 l 9-34A, the revised fee schedule, to 16 amend the Township sewer rates to $33.74 per quarter fixed and $8.42 per thousand 17 gallons variable and to amend the variable rate for East Whiteland Township to $6.20 per 18 thousand gallons. Mike seconded. 19 20 Mike asked for clarification about the difference between fixed and variable costs. 21 Carmen asked whether the cost of repainting the sequence batch reactor tanks was 22 reflected in the cost. Jon explained that this cost was not reflected in these rates, as this 23 project would not start for another couple of years and, further, that the estimated cost
24 was much lower than originally expected. 25 26 The motion passed 5-0. 27 28 Presentation and discussion with the Township Solicitor on Wireless 29 Communications Facilities in public right of ways, the impact of the recent 30 Commonwealth Court ruling and the regulations recently issued by the FCC 31 Kristin and Kim provided an overview of their memo on wireless communications 32 facilities in light of recent laws, FCC rulings and court cases. Kim explained that the 33 Township's existing ordinance should be amended to comply with FCC's recent 34 Small Cell Wireless Order establishing shorter windows for the time frame within 35 which local governments must review small cell wireless facilities. She also noted 36 that under a recent Commonwealth Court decision, which is currently under appeal, 37 distributed antenna system (DAS) operators who hold a valid certificate of public 38 convenience cannot be required to follow the approval process outlined in a 39 municipal ordinance. However, she explained that most operators will still willingly 40 go through the process and encouraged the Township to continue to dialogue 41 constructively with operators. 42 43 Mike asked whether DAS technology is getting smaller, to which Kim explained that 44 the technology is getting smaller, but that more facilities are being proposed and 45 built. He looked at some of the pictures and noted that the DAS facilities blended 46 well with existing streetscapes, and asked why the Township should care about this
4/2/19 April 2, 2019 2
1 issue. Kim noted that in some historic sections of municipalities the systems can 2 occasionally stick out. He also asked why the DAS facility installed on Wilson Avenue 3 was on a wood pole and not a dark metal pole like the other systems in the 4 Township. Mark explained that Wilson Drive already has wooden utility poles, so 5 the new pole does not stick out along the existing streetscape; but that the pole 6 along Goshen Corporate Parkway, where the existing utilities are buried 7 underground, is dark metal, which matches the street lights. 8 9 Janet asked about removal costs if a DAS facility is no longer used. Kim stated that 10 the Township current ordinance requires that the operator incur those costs. 11 12 David asked if an operator besides Crown Castle might seek approval for new DAS 13 facilities. Kim noted that neither AT&T nor Verizon use Crown Castle, and therefore 14 it was likely that other operators would approach the Township. However, Kristin 15 noted that she is hopeful that the Township's positive experience with Crown Castle 16 could serve as a model for how to work with other operators. David also asked 17 about the health impacts from 5G infrastructure, which rely on high frequency 18 microwaves. Rick noted that existing law prevents municipalities from using health 19 concerns as a reason to deny applications. 20 21 Kristin asked the Planning Commission to review the Township 'sexisting wireless 22 ordinance in light of recent federal and state laws, rules and court decisions. Brad 23 asked about design standards for poles in the Township's proposed Traditional 24 Neighborhood District overlay. 25 26 Discussion of Liquor Control Board preemption of zoning regulations for liquor 27 sales 28 Kristin explained that virtually all aspects of alcohol sales in Pennsylvania are governed 29 by the PA Liquor Code, and that the only clear authority municipalities have to regulate 30 alcohol sales is by restricting restaurants in different zoning districts, but that zoning 31 ordinances must be "liquor neutral". That is, generally speaking municipalities cannot 32 restrict whether restaurants have liquor licenses. 33 34 Mike noted that municipalities are limited to one liquor license per 3,000 residents, which 35 works out to six licenses in East Goshen, and asked what would happen if there were to 36 be a PLCB application for a seventh license. Kristin explained that once the threshold is 37 met, any subsequent license would be subject to an inter-municipal transfer hearing, 38 which is similar to a conditional use hearing. However, in order to deny a liquor license 39 in that scenario, the burden of proof is on the municipality to show that an additional 40 liquor license would have a substantially negative impact on the health, safety and 41 welfare of the community. The Township would need to commission studies using 42 empirical evidence to demonstrate that this potential impact is real. She noted that West 43 Chester Borough once denied an application on these grounds, but that the applicant 44 appealed the decision and was eventually granted the license, albeit with conditions, such 45 as no drink specials, extra bouncers and security cameras. However, under a more recent 46 Commonwealth Court decision, the LCB does not enforce those conditions.
4/2/19 April 2, 2019 3
1 2 Kristin also noted that restaurants can obtain "economic development" liquor licenses if 3 they have exhausted all of their options for obtaining a liquor licenses, can show that their 4 food-to-alcohol sales will be above a certain ratio and that the license will promote 5 economic development. She also noted that liquor licenses for breweries and brew pubs 6 fall into a different category than restaurants, and that these licenses treat the brewery as a 7 manufacturing site and allow breweries to seJI their beer at two satellite off-site locations. 8 Kristin noted that West Chester Borough's zoning ordinance distinguishes between brew 9 pubs and restaurants. 10 11 David referred to a National Highway Transportation Safety Administration white paper 12 on the regulation of alcohol sales and asked Kristin if any of the options laid out in the 13 report were options that East Goshen could consider. Kristin observed that all of the 14 NHTSA's recommendation were either already codified in the Township's zoning 15 ordinance or under the purview of the PLCB. 16 17 Mark noted that Giant has an application pending with the PLCB for retail sales and 18 asked for Kristin's advice about whether the Township could request information about 19 its planned sales as part of its permit application for store modifications. Kristin stated 20 that this is public information and that Giant would probably provide it, if asked. Kristin 21 also noted that the Township can become a party to any PLCB application and can 22 present evidence on the record either for or against an application. 23 24 Ernie asked whether East Goshen's recent referendum on liquor sales increased the quota 25 of available licenses in Chester County, to which Kristin responded that it did not. He 26 also asked for clarification about whether licenses could be transferred across county 27 lines, to which Kristin responded that they could not 28 29 Brad asked what would happen to a license if a restaurant or bar was either sold or 30 went out of business. Kristin responded that the license is an asset of the business 31 that can be sold as the owner sees fit. 32 33 Treasurer's Report 34 Carmen made a motion to approve the Treasurer's Report of April 4, 2019. David 35 seconded. The motion passed 4-0. 36 37 Adjournment 38 Mike made a motion to adjourn at 8:30. Carmen seconded. The motion passed 5-0. 39 40 Respectfully submitted, 41 Jon Altshul 42 Recording Secretary 43 44 Attached: April 4, 2019 Treasurer's Report 45
4/2/19 April 2, 2019 4
TREASURER'S REPORT March 29 - April 4, 2019 RECEIPTS AND BILLS
I GENERAL FUND
Real Estate Tax $122,184.92 Accolrls Payable $445,838.73 Earned Income Tax $11,100.00 ElectrQnic Pmts: Loca I Service Tax $0.00 Credit Card $0.00 Transfer Tax S0.00 Postage $1,000.00 General Fund Interest Earned $8,318.39 Debt Service $0.00 Total Other Revenue $568,941.63 Payroll $59,713.01
Total General Fund Receipts: $710,544.94 Total Expenditures: $506,551.74
lsTATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $151.55 Total State Liqud Fuels Receipts: $151.55 Total Expenditures: $0.00
!CAPITAL RESERVE FUND
Receipts $731.24 Accomts Payable $0,00 Interest Earned $5,176.18 Credit Card SO.OD Total Capital Reserve Fund Receipts: $5,907.42 Total Expenditures: $0.00
jTRANSPORTATION FUND
Receipts $0,00 Accounts Payable S0.00 Interest Earned $905.82 Total Transportation Fund Receipts: $905.82 Total Expenditures: $0.00
!SEWER OPERATING FUND
Receipts $11,263.92 Accol.lltS Payable $991.87 Interest Earned $1,566.57 Credtt Card $0,00 Debt Service $0.00 Total Sewer Operating Fund Receipts: $12,830.49 Total Expenditures: $991.87
!REFUSE FUND
Receipts $3,985.78 Acccunts Payable $0.00 Interest Earned $973.51 Total Refuse Fund Receipts: $4,959.29 Total Expenditures: $0.00
IBOND FUND
Receipts S0.00 Accoll'\ls Payable $0.00 Interest Earned $12,589.84 Total Bond Fund Receipts: $12,589.84 Total Expenditures: $0.00
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0,00 Interest Earned $1,446.80 Total Sewer Capital Reserve Fund Receipts: $1,446.80 Total Expenditures: $0.00
!OPERATING RESERVE FUND
Receipts $0.00 Accolllts Payable Interest Earned $1,390.33 1 Total Operating Reserve Fund Receipts: $1,390.33 Total Expenditures: $0.00
4/2/19 April 2, 2019 5
TREASURER'S REPORT April 5 -April 17, 2019 RECEIPTS AND BILLS
jGENERAL FUND
Real Estate Tax $17,826.40 Accounts Payable $92,961.37 Earned Income Tax $87,446.79 El§ctronic Pmts: Local Service Tax $6,490.18 Credit Card $0.00 Transfer Tax $147,479.59 Postage $41.00 General Fund Interest Earned $0.00 Debt Service $100,609.50 Total Other Revenue $81,337.48 Payroll $113,426.25
Total General Fund Receipts: $340,580.44 Total Expenditures: $307,038.12
I STATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total State Liqud Fuels Receipts: $0.00 Total Expenditures: $0.00
I CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $94,731.54 Interest Earned $0.00 Credit Card $0.00 Total Capital Reserve Fund Receipts: $0.00 Total Expenditures: $94,731.54
!TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Transportation Fund Receipts: $0.00 Total Expenditures: $0.00
!SEWER OPERATING FUND
Receipts $17,069.99 Accounts Payable $29,286.80 Interest Earned $0.00 Credit Card $0.00 Debt Service $66,756.46 Total Sewer Operating Fund Receipts: $17,069.99 Total Expenditures: $96,043.26 I REFUSE FUND
Receipts $3,878.27 Interest Earned $0.00
Accounts Payable $66,449.18
Total Refuse Fund Receipts: $3,878.27 Total Expenditures: $66,449.18
IBOND FUND
Receipts $0.00 Accounts Payable $247,701.79 Interest Earned $0.00 Total Bond Fund Receipts: $0.00 Total Expenditures: $247,701.79
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $47,044.47 Interest Earned $3,133.60 Total Sewer Capital Reserve Fund Receipts: $3,133.60 Total Expenditures: $47,044.47
I OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Operating Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
EA ST GOSHEN TOWN SHIP
MEMORANDUM
TO: BOARD OF SUPERVISORS
FROM: JO I AL TSHUL
SUBJECT: PROPOSED PAYMENTS OF BILLS
DATE: APRIL I 8, 20 I 9
Attached please find the Treasurer's Report for the weeks of April 5 -April 17, 2019.
Recommended motion: Mr. Chairman, I move that we graciously accept the receipts and approve the expenditures as presented in the Expenditure Register and as summarized in the Treasurer's Report.
F:\Data\Shared Data\Finance Dcpt\Treasurcrs' Reports \2019\04-17-19\04-18-19 MEMO.docx
EAST GOSHEN TOWNSHIP MONTHLY DEBT PAYMENT BREAKDOWN
April 25, 2019
GENERAL FUND:
Interest Principal Year of Loan Original Remaining Retirement payment payment Issuance Description loan amount Principal Date
$6,443.45 $0 2003 Multi purpose $5,500,000 $1,794,000 2023 9 projects
$801.85 $0 1999 Applebrook $3,000,000 $237,000 2019 Park
$239.20 $22,000 2000 Spray $287,000 $47,000 2021 Irrigation
$71,125.00 $0.00 2017 G Playground , Dams, $5,310,000 $5,305,000 2037 & Paoli Pike Trail
SEWER FUND:
Interest Principal Loan Original Remaining Retirement payment payment Description loan amount Principal Date
$21,717.30 $0.00 2008 RCSTP $9,500,000 $6,581,000 2032 Expansion
$5,119.78 $0.00 2013 Diversion $2,500,000 $2,015,000 2033 Projects
$39,919.38 $0.00 2017 s West Goshen STP $2,840,000 $2,820,000 2037
East Goshen Township Fund Accounting
Report Date 04/11/19
HARP05 run by BARBARA 4 56 PM
Vendor Req I Budgetl Subl Description
05 SEWER OPERATING
1393 US POSTMASTER 58279 1 05429 3250 ADMIN.- POSTAGE Q'I'R.2-2019 UTILITY BILLING
06 REFUSE
1393 US POSTMASTER 58279 2 06427 3250 POSTAGE Q'I'R.2-2019 UTILITY BILLING
FUND SUl-tlARY
Fund Bank Account Amount Description
05 05 06 06 964.30 SEWER OPERATING 964.30 REFUSE
1,928.60
PERIOD SUMMARY
Period Amount
1904 1,928.60
1,928.60
BATCH 1 OF 4
Expenditures Register
GL-1904-67766
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
041119 04/11/19 04/11/19 04/11/19 3765
041119 04/11/19 04/11/19 04/11/19 655
2 Printed, totaling
964.30
964.30
964.30
964.30
1,928.60 1,928.60
1
East Goshen Township Fund Accounting BATCH 20F4
Report Date 04/15/19
MARP05 run by BARBARA
Expenditures Register
GL-1904-67811
PAGE
4 16 PM
Vendor Req # Budget# Sub# Description
01 GENERAL FUND
1657 AQUA PA 58280 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 000309801 0309801 2/26-3/27/19 BS 58281 l 01411 3630 BIDRANT & WATER SERVICE 0348603 0348603 12/31-3/29/19 HM34 58282 l 01411 3630 HYDRANT & WATER SERVICE 000309987 0309987 2/28-3/29/19 BY 58283 l 01411 3630 HYDRANT & WATER SERVICE 00310033 0706109 12/31-3/29/19 BY13 58284 l 01411 3630 BIDRANT & WATER SERVICE 000310033 0310033 2/28-3/29/19 186 58284 2 01411 3631 HYDRANTS - RECHARGE EXPENSE 000310033 0310033 2/28-3/29/19 93
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
032919 BS 04/15/19 04/15/19 17 .20
040119 HM34 04/15/19 04/15/19 2,575.50
040119 BY 04/15/19 04/15/19 137.52
040119 BYl3 04/15/19 04/15/19 858.00
040119 279 04/15/19 04/15/19 4,696.50
040119 279 04/15/19 04/15/19 2,348.25 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
293 COLONIAL ELECTRIC SUPPLY 58288 l 01409 3745 PW BUILDING - MAINT REPAIRS HIGH BAY LEDS & FIXTURE LOOPS 58291 l 01409 3740 TWP. BLDG. - MAINT & REPAIRS LED LIGHTS FOR CHAMBER OF COMMERCE
12696312
12718504
04/15/19
04/15/19
04/15/19
04/15/19
10,632.97
775.48
2,044.00
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2899 COMMONWEALTH OF PENNSYLVANIA 58292 l 01116 1000 CLEARING ACCOUNT UN-CASHED CBEKCS 01 FUND
040519
2,819.48
04/15/19 04/15/19 1.86 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
320 CONWAY POWER EQUIPMENT 58293 l 01430 2330 VEHICLE MAINT AND REPAIR CLEVIS & COTTER PINS
57430
1. 86
04/15/19 04/15/19 7.66 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
7.66
4135 DELSHAO, ASHLIE 58296 l 01367 3020 TRIPS 822916 04/15/19 04/15/19 90.00 REFUND FOR DC TRIP (2) ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3941 DISCOVERY BENEFITS INC. 58295 l 01487 1500 MISC. EMPLOYEE BENEFITS MARCH 2019 FSA FEE
0001001319-IN 04/15/19
90.00
04/15/19 50.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
50.00
l
East Goshen Township Fund Accounting
Report Date 04/15/19
MARP05 run by BARBARA 4 16 PM
Expenditures Register
GL-1904-67811
BATCH 20F 4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
3407 ETS EQUIPMENT TRADE SERVICE CO. INC. 58297 1 01430 2330 VEHICLE MAINT AND REPAIR 120369 04/15/19
4136
JANITORIAL POLES & BRUSHES
FIRSTNET - #287290606505 58299 1 01401 3210 COMMUNICATION EXPENSE MARCH 28 - MARCH 31, 2019
505X04082019 04/15/19
04/15/19 183.43
183.43
04/15/19 1,826.31 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4137 FIRSTNET - #287290608802 58298 1 01401 3210 COMMUNICATION EXPENSE MARCH 28 - MARCH 31, 2019
802-X04082019 04/15/19
1,826.31
04/15/19 1,777.39
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2631 GRAPHIC IMPRESSIONS OF AMERICA INC. 58300 1 01401 2110 STATIONERY 19-11347 BOS WINDOW ENVELOPES 58301 1 01401 2100 MATERIALS & SUPPLIES BUSINESS CARDS - M.MILLER
19-11340
04/15/19
04/15/19
04/15/19
04/15/19
1,777.39
136.00
84.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
594 IIAt,t,!OND & MCCLOSKEY INC. 58303 1 01454 3740 EQUIPMENT MAINT. & REPAIR DEWINTERIZE RESTROOMS - EGT PARK
9018 04/15/19
220.00
04/15/19 506.80 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
627 HIGHWAY MATERIALS INC. 58304 1 01436 2450 STORMWATER MATERIALS & SUPPLIES 8.12 TONS - 19mm,0.3<3,B 110960 04/15/19
506.80
04/15/19 436.86
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
436.86
3990 LANGS LAWNCARE & TREECARE 58305 1 01454 3723 BALL FIELDS 231822 04/15/19 04/15/19 159.00 EARLY FALL TREATMENT - FIELD B 58306 1 01454 3723 BALL FIELDS 231823 04/15/19 04/15/19 125.00 EARLY FALL TREATMENT - FIELD A 58307 1 01454 3723 BALL FIELDS 11107 021519 04/15/19 04/15/19 502.20 LAWN CARE TREATMENTS (4)- FIELD A ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
786.20
2
East Goshen Township Fund Accounting
Report Date 04/15/19
MARP05 run by BARBARA 4 16 PH
Expenditw:es Register
GL-1904-67811
BATCH 20F4
PAGE
Vendor Req t Budget# Sub8 Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FOND
787 LOW-RISE ELEVATOR CO. INC 58308 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS BASIC MAINTENANCE - MARCH 2019
2889 MARSH CREEK SIGNS
79894
58310 1 01454 2600 MINOR EQUIPMENT 11784 ALUMINUM DIRECTIONAL SIGNS FOR PARK
04/15/19 04/15/19 40.00
40.00
04/15/19 04/15/19 1,886.00
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1641 NAPA AUTO PARTS 58311 1 01430 2330 VEHICLE MAINT AND REPAIR 2-772839 FLEXIBLE FUNNEL 58312 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773303 BATTERY CORE RETURN 58313 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773172 WIPER BLADES 58314 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773185 AIR FILTER 58315 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773186 SPARK PLUGS 58316 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773392 AIR FILTER & AIR COMPRESSOR OIL 58317 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773393 AIR FILTER 58318 1 01430 2330 VEHICLE MAINT AND REPAIR 2-773460 AIR FILTERS
1540 NELSON, PAMELA
827
58319 1 01452 3710 ZUMBA 040819 ZUMBA INSTRUCT.- 1/29-4/8/19 REGIST
NEW ENTERPRISE STONE & LIME INC. 58320 1 01436 2450 STORM'rill.TER MATERIALS & SUPPLIES 7025191 72.35 TONS 2A STONE 58321 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 7025687 71.73 TONS 2A STONE 58322 1 01454 3723 BALL FIELDS 7028059 20.45 DIAMOND TEX PREMIUM
1,886.00
04/15/19 04/15/19 26.49
04/15/19 04/15/19 -9.00
04/15/19 04/15/19 151.50
04/15/19 04/15/19 3.41
04/15/19 04/15/19 12.12
04/15/19 04/15/19 47.08
04/15/19 04/15/19 8.08
04/15/19 04/15/19 32.32
272.00
04/15/19 04/15/19 342.55
342.55
04/15/19 04/15/19 1,276.98
04/15/19 04/15/19 1,266.04
04/15/19 04/15/19 617.59
3,160.61
3
East Goshen Township Fund Accounting
Report Date 04/15/19
MARP05 run by BARBARA 4 16 PM
Expenditures Register
GL-1904-67811
BATCH 2 OF 4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
2352 PECO - 99193-01400 58327 1 01434 3610 STREET LIGHTING 99193-01400 2/26-3/27/19 58327 2 01433 2470 UTILITIES - TRAFFIC LIGHTS 99193-01400 2/26-3/27/19
040219
040219
04/15/19
04/15/19
04/15/19
04/15/19
751.64
597.47 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3153 PECO - 01360-05046 58323 l 01409 7505 BOOT & PAOLI LED SIGN 040119 01360-05046 2/28-3/29/19 BOOT LED
1,349.11
04/15/19 04/15/19 40.68 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2593 PECO - 18510-39089 58325 l 01454 3600 UTILITIES 040419 18510-39089 3/5-4/3/19 BOW TR PUMP
40.68
04/15/19 04/15/19 48.70 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4091 PECO 02280-03067 58326 1 01454 3717 MARYDELL POND REHAB 02280-03067 3/6-4/4/19 MARYDELL 040519
48.70
04/15/19 04/15/19 164 .11 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1783 STATE WORKERS INSURANCE FUND 58329 l 01411 6000 VOLUNTEER FIREFIGHTER WORKERS COMP 042619 POL#05918452 INSTALL 5 OF 11
164 .11
04/15/19 04/15/19 4,419.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2933 TRANS-FLEET CONCRETE 58330 1 01436 2450 STORMWATER MATERIALS & SUPPLIES 5.50 CYDS CONCRETE & TRUCKING 158694
4,419.00
04/15/19 04/15/19 785.50
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1353 TRAVELERS 58331 l 01486 3500 INSURANCE COVERAGE -PREM. FIDUCIARY INSURANCE 2019
785.50
5398D3186-2019 04/15/19 04/15/19 2,525.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2,525.00
4
East Goshen Township Fund Accounting
Report Date 04/15/19
MARP05 run by BARBARA
Vendor Req f Budget# Sub#
03 SINKING FUND
4 16 PM
Description
293 COLONIAL ELECTRIC SUPPLY 58289 1 03409 7450 CAPITAL PURCHASE - TWP BLDG BOLT-ON BREW & CB - VESTIBULE 58290 1 03409 7450 CAPITAL PURCHASE - TWP BLDG BWE SWITCHES - VESTIBULE
Expenditures Register
GL-1904-67811
BATCH 20F4
PAGE
Invoice Number Req Date Check Dte Recpt Dte Checkl Amount
12708924
12719244
04/15/19
04/15/19
04/15/19
04/15/19
145.16
456.58
601. 74
5
East Goshen Township Fund Accounting
Report Date 04/15/19
HARP05 run by BARBARA 4 16 PM
Expenditures Register
GL-1904-67811
BATCH 20F4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERATING
1658 AQUA PA 58285 1 05420 3602 C.C. COLLECTION -UTILITIES 000309826 0309826 2/26-3/27/19 TH 58286 1 05420 3602 C.C. COLLECTION -UTILITIES 000305003 0305003 2/27-3/28/19 WW 58287 l 05422 3601 R.C. COLLEC.-UTILITIES 001533998 10877842 2/26-3/27/19 TWN
2899 COMMONWEALTH OF PENNSYLVANIA
1526
583
58292 2 05116 1000 CLEARING ACCOUNT UN-CASHED CHECKS 05 FUND
CUSTOM ENVIRONMENTAL TECHNOLOGY 58294 l 05422 2440 R.C. STP- CHEMICALS 2290 TOTE BINS ZETA LYTE
HACH COMPANY 58302 l 05422 3700 R.C. STP-MAINT.& REPAIRS TNT, FILTER PAPER, DEIONIZED WATER & LATEX GLOVES
3043 MAIN POOL & CHEMICAL COMP. INC. 58309 1 05422 2440 R.C. STP- CHEMICALS 1760 GALS ALUMINUM SULFATE SOLUTION
032919 TH
040119 WW
032919 'l'WN
040519
5424
11400412
1974574
58309 2 05422 2440 R.C. STP- CHEMICALS 1974574 196 50LB BAGS SODIUM CARBONATE
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
04/15/19
37.63
29.56
60.95
128.14
20.92
20.92
4,362.80
4,362.80
1,524.28
1,524.28
2,534.40
3,312.40 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2827 PECO - 04725-43025 58324 l 05420 3603 ASHBRIDGE - UTILITIES 040419 04725-43025 3/5-4/3/19 WYLPEN PUMP
5,846.80
04/15/19 04/15/19 589.49 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
589. 49
6
East Goshen Township Fund Accounting
Report Date 04/15/19
MARP05 run by BARBARA
Vendor Req # Budget# Sub#
4 16 PM
Description
1082 PIPE DATA VIEW 58328 1 05420 3702 C.C. COLLEC.-Ml\INT.& REPR.
Expenditures Register
GL-1904-67811
BATCH 2 OF 4
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
17948 04/15/19 04/15/19 585.00 CLEAR SEWER LINE BLOCKAGE - N.LOCBW
3529 VERIZON - 442069312 MODEMS 58332 1 05420 3601 C.C. INTERCEPTOR-UTILITIES FEB.26 - MARCH 25, 2019 MODEMS
FUND SUMMARY
Fund Bank Account Amount Description
01 01 03 03 OS OS
34,372.22 GENERAL FUND 601.74 SINKING FUND 13,158.72 SEWER OPERATING
48,132.68
PERIOD SUMMARY
Period Amount
1904 48,132.68
48,132.68
9826925323 04/15/19
585.00
04/15/19 101.29
101.29
48,132.68 0 Printed, totaling 48,132.68
7
East Goshen Township Fund Accounting
Report Date 04/17/19
MARP05 run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 30F4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
68 AMS APPLIED MICRO SYSTEMS LTD. 58333 1 01401 3120 CONSULTING SERVICES MARCH 2019 58333 2 01414 5001 ZONING IT CONSULTING MARCH 2019 - GEO PLAN
82 ASSOCIATED TRUCK PARTS
2695
3249
58334 1 01430 2330 VEHICLE MAINT AND REPAIR FLAT TOP NUT COVERS
BRICKHOUSE ENVIRONMENTAL S8335 1 01454 3100 PROFESSIONAL SERVICES PROF.SERVICES MARCH 2019 - WATER SAMPLING S8336 1 014S4 3100 PROFESSIONAL SERVICES PROF.SERV.MARCH 2019 -APPLBRK CC/G'il
COMCAST 8499-10-109-0107712
65493
65493
308549
2151
2163
58338 1 01401 3210 CettroNICATION EXPENSE 040419
3490
0107712 4/5-5/4/19 PAOLI & BOOT LED
COMCAST 8499-10-109-0111284 58337 1 01401 3210 C<ltroNICATION EXPENSE 040419 0111284 4/9-5/8/19 SPEC.VIDEO - PW
3687 ELLIOT, BARBARA 58340 1 01367 3020 TRIPS 822922 REFUND NYC TRIP - UNABLE TO ATTEND
1876 FOLEY INC. S8345 1 01436 3840 STORMWATER EQUIPMENT RENTAL F4036801 MINI EXCAVATOR, THUMB, COUPLER & BUCKET RENTAL 3/14-4/11/19 S8346 1 01432 3840 SNOW - EQUIPMENT RENTAL F4009404 WHEEL LOADER RENTAL 3/20-4/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
1,097.00
28.00
1,125.00
33.90
33. 90
337.58
1,190.00
1,527.58
107.87
107.87
39.09
39.09
90.00
90.00
3,895.00
4,961.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
8,856.00
1
East Goshen Township Fund Accounting
Report Date 04/17/19
HARP05 run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 30F4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
2717 BIGGINS & SONS INC., CHARLES A. 58347 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAP.LIGHT REPAIR- WC PK & CHESTER
BOL RD.
719 KEEN COMPRESSED GAS COMPANY 58349 l 01437 2460 GENERAL EXPENSE - SHOP VARIOUS CYLINDERS OF GASES
2813 LAYFIELD, RUBY
49349
83223050
58385 l 01452 3711 PILATES 041519 PILATE INSTRUCTION - 3/13-4/12/19
813 MAIN LINE CONCRETE 58350 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 3.5 YDS CONCRETE 58351 1 01409 3740 TWP. BLDG. · MAINT & REPAIRS 2.5 YDS CONCRETE
3862 MILLER CONCRETE LLC
437720
438251
58352 1 01436 3840 STORMWATER EQUIPMENT RENTAL 10108
2884
TYPE C BIKE SAFE GRATES & M TOPS CHRISTINE LANE & TALLMADGE DR.
NEOPOST 58354 1 01401 3250 POSTAGE 1000 PK. METER TAPES 15696650
04/17/19 04/17/19 2,980.00
2,980.00
04/17/19 04/17/19 71.72
71. 72
04/17/19 04/17/19 415.65
415.65
04/17/19 04/17/19 590.50
04/17/19 04/17/19 477.50
1,068.00
04/17/19 04/17/19 8,255.00
8,255.00
04/17/19 04/17/19 41.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3679 NETCARRIER TELECOM INC. 67846 58356 1 01401 3210 COtKJNICATION EXPENSE 4/1/19 - 4/30/19 577992
41.00
04/17/19 04/17/19 443.78 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
443.78
2
East Goshen Township Fund Accounting
Report Date 04/17/19
MARP05 run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 30F4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Ote Checkl Amount
3680 NETCARRIER TELECOM INC. 67891 58360 1 01401 3210 CottroNICATION EXPENSE 4/1/19 - 4/30/19
827 NEW ENTERPRISE STONE & LIME INC.
2759
58353 1 01454 3723 BALL FIELDS 10.34 TONS DIAMOND TEX PREMIUM
NEW HOLLAND GROUP 58362 1 01430 2330 VEHICLE MAINT AND REPAIR CLIPS #14
967 O'MALLEY TOPSOIL LLC 58365 1 01436 2450 STORMWATER MATERIALS & SUPPLIES 30 YDS SCREENED TOPSOIL-RESTORATION
577999
7029063
1359155
4294
58365 2 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 4296 30 YDS SCREENED TOPSOIL-RESTORATION
3548 OFFICE BASICS
1554
58363 1 01401 2100 MATERIALS & SUPPLIES 1-[)NEY RECEIPT BK & "WHILE YOU WERE OUT" PADS
OFFICE DEPOT
I-1178201
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
58364 1 01401 2100 MATERIALS & SUPPLIES 296108314001 04/17/19
1002
!NVELOPES, LEGAL & STENO PADS, AAA
& D BATTERIES
PA MUNICIPAL LEAGUE 58370 1 01487 4600 TRAINING & SEMINARS-EMPLY 032919MG 2019 PCCA COURSE - M.GORDON (INT'L. PROPERTY MAINTENANCE)
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
134.87
134.87
312.27
312.27
5.76
5. 76
540.00
540.00
1,080.00
8.79
8.79
56.44
56.44
125.00
125.00
3
East Goshen Township Fund Accounting
Report Date 04/17/19
MARP05 run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 30F4
PAGE
Vendor Req # Budget# Sub* Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
1022 PATTERSON, MICHAEL J. 58367 1 01454 3725 SATELITE PARK IMPROVEMENT (PONDS) 041219-2 INSTALL SPLIT RAIL FENCE & GATE - BRIAN DR. - POND
1032 PECO - 99193-01302 58368 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 99193-01302 2/26-3/27/19 58368 2 01454 3600 UTILITIES 99193-01302 2/26-3/27/19
1005 PENNSYLVANIA ONE CALL SYSTEM
2417
58371 1 01438 2450 Mll.TERIALS & SUPPLIES-HIGHWAYS MONTHLY ACTIVITY - Mll.RCH 2019
PPC LOBRICANTS EAST 58372 l 01430 2320 VEHICLE OPERATION - FUEL 55 GALS. BLUE DEF.
2674 PROVANTAGE CORPORATION 58373 1 01407 2130 COMPUTER EXPENSE 2PT USB DPT CABLE KVM SWITCH
3365 RANKIN GLASS
2673
58374 1 01430 2330 VEHICLE Ml.INT AND REPAIR GLASS - LOADER #17
RYERSON & SON INC. , J. T . 58376 1 01430 2330 VEHICLE Ml.INT AND REPAIR STAINLESS STEEL ANGLES 58377 l 01430 2330 VEHICLE Ml.INT AND REPAIR STAINLESS STEEL PLATE & TOBES
040819
040819
0000808650
1649209
8335917
6161
9301867478
9301867477
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
04/17/19 04/17/19
3,300.00
3,300.00
3,157.02
229.73
3,386.75
29.79
29. 79
166.35
166.35
69.88
69.88
200.00
200.00
575.84
686.13
1,261.97
4
East Goshen Township FUnd Accounting
Report Date 04/17/19
MARP05 run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 3 OF 4
PAGE
Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount
1212 SAYRE INC., G.L. 58378 1 01430 2330 VEHICLE MAINT AND REPAIR GASaT-AXLE SIW"l' & SEAL-OIL 58379 1 01430 2330 VEHICLE MAINT AND REPAIR CREDIT - 8 11 MIRROR RETURN
4003 SEITER, EMMA
2121
58380 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS CLEAN PLANK BOUSE
SHERWIN-WILLIAMS CO. 58381 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS REFUND - 5 GALS PAINT - PLANK BOUSE 58382 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS REFUND - 1 GAL. PAINT - PLANK BOUSE 58383 1 01409 3745 PW BUILDING - MAINT REPAIRS 1 GAL.PAINT - PW SHOP 58384 1 01430 2330 VEHICLE MAINT AND REPAIR 5 GALS. PRIMER & PAINT - SHORING TRAILER
1389 UNRUH TURNER BURKE FREES
1-290940055
1-283540137
041619
5757-2
5756-4
7509-5
3817-5
58387 1 01414 3141 LEGAL - ZONING BEARING BOARD 162542 LEGAL SERV. 11/20/18-3/1/19 MALVERN mSTITUTE
2050 VILLAGE MEDICAL 58388 1 01487 1500 MISC. EMPLOYEE BENEFITS PHYSICALS - EGT FIREFIGHTERS - M.BOLMES, K.MILLER, V.D'AMICO, P. GROFF, $.BIONDI & W.MINAHAN
00157527-00
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
55.77
-47.76
8.01
350.00
350.00
-217.47
-28.62
66.78
443.33
264.02
11,213.41
11,213.41
390.00
390.00
5
East Goshen Township Fund Accounting
Report Date 04/17/19
MARP05 run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 30F4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Checkl Amount
03 SINKING FUND
473 FASTSIGNS 58343 1 03409 7450 CAPITAL PURCHASE - TWP BLDG 36857657 SIGNS FOR FRONT DOOR REDIRECTION
3964 HOODER INC., F.W. 58348 1 03409 7450 CAPITAL PURCHASE - TWP BLDG CONTRACTOR'S PAYMENT #1 - WASH BAY
4011 REMINGTON & VERNICK ENGINEERS INC.
040419
58375 1 03409 7450 CAPITAL PURCHASE - TWP BLDG PCEGTOOl-11 PROF. SERVICE THRU 3/31/19 - WASH BAY
04/17/19 04/17/19 68.40
68.40
04/17/19 04/17/19 91,883.20
91,883.20
04/17/19 04/17/19 2,178.20
2,178.20
6
ast oshen Township Fund Accounting
Report Date 04/17/19
MARP05 run by BARBAM 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 30F4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERATING
431 EJ USA INC. (EAST JORDAN) 58341 l 05420 3702 C.C. COLLEC.-MAINT.& REPR. 110190017749 04/17/19 RESURFACING FRAMES
1668 EXETER SUPPLY COMPANY INC
3675
3676
3677
3678
58342 l 05422 3700 R.C. STP-MAINT.& REPAIRS PIPES, DRAINAGE TEES & COUPLINGS
NETCARRIER TELECOM INC. 67889 58358 1 05420 3602 C.C. COLLECTION -UTILITIES 4/1/19 - 4/30/19
NETCARRIER TELECOM INC. 67890 58359 l 05422 3600 R.C STP -UTILITIES 4/l/19 - 4/30/19
NETCARRIER TELECOM INC. 67887 58355 1 05420 3602 C.C. COLLECTION -UTILITIES 4/1/19 - 4/30/19
NETCARRIER TELECOM INC. 67888 58357 1 05420 3603 ASHBRIDGE - UTILITIES 4/1/19 - 4/30/19
3725 NETCARRIER TELECOM INC. 68255 58361 1 05420 3604 MILL VAL./oY UTILITIES 4/1/19 - 4/30/19
1022 PAfflRSON, MICHAEL J.
319084
577997
577998
577995
577996
578174
58366 1 05420 3705 ASHBRIDGE-MAINT.&REPR 041219-1 REPAIR DAMAGED PRIVACY FENCE - 1660 MANLEY
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19 1,064.28
1,064.28
04/17/19 683.50
683.50
04/17/19 48.94
48.94
04/17/19 48.94
48.94
04/17/19 48.94
48.94
04/17/19 49.45
49.45
04/17/19 50.13
50.13
04/17/19 860.00
860.00
7
East Goshen Township Fund Accounting
Report Date 04/17/19
MARP05 run by BARBARA 11 33 AM
Vendor Req # Budget# Subl Description 05 SEWER OPERATING
1031 PECO - 99193-01204 58369 1 05420 3602 C.C. COLLECTION -UTILITIES 99193-01204 2/26-4/1/19 58369 2 05420 3604 MILL VAL./WE!l'AY UTILITIES 99193-01204 2/26-4/1/19 58369 3 05420 3600 C.C. METERS - UTILITIES 99193-01204 2/26-4/1/19 58369 4 05422 3601 R.C. COLLEC.-UTILITIES 99193-01204 2/26-4/1/19 58369 5 05422 3600 R.C STP -UTILITIES 99193-01204 2/26-4/1/19
1005 PENNSYLVANIA ONE CALL SYSTEM 58371 2 05420 3701 C.C. INTERCEPT.-MAINT.&REP MONTHLY ACTIVITY - MARCH 2019 58371 3 05420 3702 C.C. COLLEC.·MAINT.& REPR. MONTHLY ACTIVITY - MARCH 2019
1983 YALE ELECTRIC SUPPLY CO 58391 1 05422 3701 R.C. COLLEC.·MAINT.& REPR 10 FT. GALVANIZED BLUE CAP 58392 l 05422 3701 R.C. COLLEC.·MAINT.& REPR PVC ADAPTERS, END CAPS, SLOTTED BOLES, SPRING NUTS AND STRAP
Expenditures Register
GL-1904-67837
BATCH 3 OF 4
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
040819
040819
040819
040819
040819
0000808650
0000808650
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
S112770679.001 04/17/19
S112767736.001 04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
04/17/19
1,007.99
339.03
10.26
402.92
9,119.64
10,879.84
29.79
29.80
59.59
63.37
76.57
139.94
8
East Goshen Township Fund Accounting
Report Date 04/17/19
MARPOS run by BARBARA
Vendor Req # Budget# Sub#
06
REFUSE
l1 33 AM
Description
4081 TOTAL RECYCLE INC. 58386 1 06427 4504 RECYCLING FEES RECYCLING FEES 3/5-3/26/19
Expenditures Register
GL-1904-67837
BATCH 3 OF 4
PAGE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
0000007666 04/17/19 04/17/19 2,917.03
2,917.03
9
!ast Goshen Township Fund Accounting
Report Date 04/17/19
MARPOS run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67837
BATCH 3 OF 4
PAGE
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte CheckJ Amount
08 BOND FUNDS (CAPITAL PROJECTS)
3843 WEST GOSHEN SEWER AUTHORITY 58389 1 08429 6000 WEST GOSHEN STP IMPROVEMENTS 040919-1 2017 SEWER SYSTEM PROJECT .16667% EAST GOSHEN SHARE 58390 1 08429 6000 WEST GOSHEN STP IMPROVEMENTS 040919-2 2017 SEWER SYSTEM PROJECT .16667% ENGINEERING - EAST GOSHEN SHARE
04/17/19 04/17/19 235,226.03
04/17/19 04/17/19 12,475.76
247,701.79
10
East Goshen Township Fund Accounting
Report Date 04/17/19
MARP0S run by BARBARA 11 33 AM
Expenditures Register
GL-1904-67937
BATCH 30F4
PAGE
Vendor Req I Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Ote Check# Amount
09 Sewer Capital Reserve Fund
356 DECRMAN ELECTRIC 58339 1 09429 7400 MJ.CBINERY/EQUIPHENT - REPLACEMENT 95311 NEW FAIRBANKS MORSE 4"PUHPS (2)
FUND SUM-IARY
Fund Bank Account Amount Description
01 01 03 03 05 05 06 06 08 08 09 09
47,417.90 GENERAL FUND 94,129.80 SINKING FUND 13,933.55 SEWER OPERATING 2,917.03 REFUSE 247,701.79 BONO FUNDS (CAPITAL PROJECTS) 47,044.47 Sewer Capital Reserve Fund
453,144.54
PERIOD SUMMARY
Period Amount
1904 453,144.54
453,144.54
04/17/19 04/17/19 47,044.47
47,044.47
453,144.54 0 Printed, totaling 453,144.54
11
gast (;()shen Township Fund Accounting BATCH 40F4
Report Date 04/17/19 Procurement Card Entries PAGE
MARPl 7 run by BARBARA l : 39 PM
Per Budget I Subf Description Vendr Vendor Name Invoice I Inv Date Credit Srce Trx f • u ---- -------- ---- ---------------------------------------- ---------------------------------------- --------------- -------- ------------ ---- ----- --- - 1904 CREDIT CARD PAYMIN'l' 01401 3400 NOTIC! - EGT SM.OF ASSETS 2226 21ST CENT.MEDIA NEWS #884433 1111627 03/26/19 262.41 PC 67839 1 05422 3701 STAND BI TIM& MARCH 6 - MARCH 26 4045 AC! DISPOSAL CORPORATION 147286 04/01/19 150.00 PC 67839 2 06427 4500 RESIDENTIAL PICK-UP · APRIL 2019 2762 AJB A.J. BWSENSKI INC. 94103385 04/01/19 57,910.03 PC 67839 3 01401 3000 LifflR COLLECTION - APRIL 2019 2762 AJB A.J. BWSENSKI INC. 94103385-L 04/01/19 1,920.00 PC 67839 4 05422 4500 LAB TESTING RCSTP - 3/12-3/19/19 2918 ALS ENVIRONMENTAL 40-2321257 03/31/19 195. 00 PC 67839 5 05422 4500 LAB TESTING RCSTP - 3/19/19 2 918 ALS ENVIRONMENTAL 40-2321768 04/01/19 165.00 PC 67839 6 06427 4502 Wl!K 3/25/19 - 3/29/19 241 C.C. SOLID WASTE AU'l'HORITY 53457-R 03/31/19 4,657.82 PC 67839 7 05422 4502 WEEK 3/25/19 - 3/29/19 241 C.C. SOLID liASTI! AUTHORITY 53457-S 03/31/19 618.24 PC 67839 8 01430 2330 1/4 AIR NIPPLES 2 4 4 2 KENT AUTOMOTIVE 9306606048 04/01/19 104.57 PC 61839 9 01430 2330 CO'l'TBR PINS 2 4 42 KENT AOTOli'.}TIVE 9306561999 03/14/19 43.17 PC 67839 10 01432 2500 INSULATED CLAMPS, BALL VALVES, MALI! 2442 KENT AUTOMOTIVE 9306561998 03/14/19 1,627.02 PC 67839 11 01432 2500 GATES 2-BRAID HOSE - SPREADER LINER 2442 KENT AUTOMOTIVE 9306565751 03/15/19 1,603.70 PC 67839 12 01430 2330 HYDRO COUPLRSOCKETS 2 4 42 Kl!N'I' AOTOli'.}TIV! 9306569134 03/18/19 653. 75 PC 67839 13 01430 2330 KEY RINGS, BRASS TAGS & ABRASIVE 2 4 4 2 KENT AUTOMOTIVE 9306586596 03/22/19 364.07 PC 67839 14 01430 2320 625.5 GALS. DIESEL 1161 REILLY & SONS INC 162413 -531 03/26/19 1,423.64 PC 67839 15 01430 2320 661.0 GALS. DIESEL 1161 REILLY & SONS INC 161938 -531 03/19/19 1,503.11 PC 67839 16 01430 2320 456. l GALS. DIESEL 1161 REILLY & SONS INC 162850-531 04/02/19 1,044.93 PC 67839 17 01430 2320 247 .1 GALS. GASOLINE 1161 REILL! & SONS INC 162856-530 04/02/19 521.88 PC 67839 18 01401 3210 3/28/19 - 4/27 /19 2829 VERIZON - 'l'WP.FIOS 0001-74 0001-74 32719 03/27/19 99.00 PC 67839 19 05422 3601 3/28/19 - 4/27/19 2173 VERIZON - PW FIOS 0001-15 0001-15 32719 03/27/19 101.99 PC 67839 20 ---- -------- ---- ----------------------------------- ----- ---------------------------------------- --------------- -------- ------------ ---- ----- --- -
G!NERAL Ll!DGBR Smt!ARY
GL Account I
014XX·XXXX 01101-1010 054XX-XXXX 05100-1005 064XX-XXXX 06100-1005
Debit
11,171.25
1,230.23
62,567.85
Credit Description
GENERAL FUND Expense Account 11,171.25 GENERAL FUND Bank Account SEWER OPERATING Expense Account 1,230.23 SEWER OPERATING Bank Account REFUSB !xpense Account 62,567.85 REFUSE Banlt Account
74,969.33
74,969.33
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. 129-C- 2019
AN ORDINANCE OF THE TOWNSHIP OF EAST GOSHEN,
CHESTER COUNTY, PENNSYLVANIA, AMENDING CHAPTER 225 OF THE EAST GOSHEN TOWNSHIP CODE, TITLED, "VEHICLES AND TRAFFIC," SPECIFICALLY 225-57, SCHEDULE XIV to PROHIBIT PARKING AT ALL TIMES ON THE WEST SIDE OF SCHOOL LANE BETWEEN OLD WEST CHESTER PIKE AND CENTER STREET.
BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township that Chapter 225 of the Code of the East Goshen Township, titled "Vehicles and Traffic," is hereby amended as follows:
SECTION 1. Section 225-57 Schedule XIV, shall be amended by adding the following.
Name of Street
School Lane
Side
West
Location
Between Old West Chester Pike and Center Street
Note: School Lane is (T-487), Old West Chester Pike (AKA as Adams Street) is (T369) and Center Street is (T-490)
SECTION 2. Severability. If any sentence, clause, section or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the
Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
SECTION 3. Repealer. All Ordinances or parts of Ordinances conflicting with any
provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 4. Effective Date. This Ordinance shall be effective five (5) days following enactment as by law provided.
ENACTED AND ORDAINED this __ day of ______ : 2019.
ATTEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Janet L. Emanuel, Chairman
E. Martin Shane, Vice-Chairman
Carmen R. Battavio, Member
David Shuey, Member
Michael Lynch, Member
F:\D_ata\Shared Data\Admin Dept\Township Code\Vehicles & Traffic\No Parking\2019\452178.docx
2
61 0-692-7171 www.eastgoshen.org
April 3, 2019
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Dear Property Owner:
It has been brought to the Township 's attention that vehicles are being parked on a section of School Lane such they are impeding thru traffic, snow removal operations, refuse/recycling collection and emergency vehicles.
The purpose of this letter is to inform you that Board of Supervisors will hold a public hearing as part of their regularly scheduled meeting on April 23, 2019 at 7:00 PM to consider the adoption of an ordinance that would prohibit parking on the west side of School Lane between Old West Chester Pike (AKA Adams Street) and Center Street.
The meeting will be held at the East Goshen Township Building located at 1580 Paoli Pike, West Chester, PA 19380. I have enclosed a copy of the proposed ordinance foY your use.
If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact the undersigned at 610-692-7171 to discuss how those needs may be accommodated.
Sincerely,
/JcK- Louis F. Smith, Jr. Township Manager
East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about a/I
Township news through Constant Contact. To sign up, go to www.eastqoshen.org, and click the "£-notification & Emergency Alert" button on the left side of the homepage.
In addition Chester County offers an emergency notification system ca/led ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone calf. Signing up is a great way to keep you and your loved ones informed and safe during emergencies. Visit www.readychesco.org to sign up today!
F:\Data\Shared Data\Admin Dept\Township Code\Vehicies & Traffic\No Parking\2019\letter 040219.doc
AREA CODE 610
6Q2•717f
April 12, 2019
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
f 580 PAOLI PIKE, WEST CHESTER, PA 1Q380·61119
Re: Land Development Application - Ducklings Learning Center 1302 Wilson Drive / ESKE Development - Tamara Building Systems
Dear Board Members:
At their meeting on April 3, 2019 the Planning Commission voted unanimously in favor of the following motion:
Mr. Chairman, I move that the Planning Commission recommend the Board of Supervisors approve the Land Development application and plans and support the waiver request for ESKE Development LLC, for 1302 Wilson Drive, prepared by DLHowell dated January 11, 2019 and last revised March 25, 2019, for a 13,815 s.f. Child Daycare Center, associated driveway, stream crossing, parking, and storm water management; with the following conditions:
1. The plan is approved as a Preliminary /Final Plan. 2. The Applicant shall address all remaining comments outlined in the Township Engineer's review letter dated 4/3/2019 prior to approval. 3. The Plan shall not be released for recording until the applicant has submitted the land development and financial security agreements and the escrow funds for the improvements. 4. The applicant shall pay the traffic impact fee of $396.25 per trip for the project prior to the issuance of any building permit. 5. Pursuant to East Goshen Municipal Authority Resolution No 22, the required sewer tap in fee will be $3,546.10. 10% of this, or $354.61, will be due at the time at the time of plan approval, with the remaining balance due when you collect your permits. 6. The applicant will follow all applicable federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted on the plans. 7. The applicant shall submit the floodplain study to FEMA. 8. The applicant shall implement the Conservancy Board Recommendations outlined in
their letter to the Planning Commission dated 3/14/2019.
Sincer";J.l
Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\PC Rec to BOS 04112019.doc
Memo
To: Board of Supervisors From: Jon Altshul Re: Consider Comments from Chester County Planning Commission on Draft Business Incubator Ordinance Date: April 11, 2019
At the April 2nd meeting, the Board directed staff to follow up with the Chester County Planning
Commission (CCPC) for clarification on recommendation 3C from its February 8, 2019 letter regarding the Township's draft incubator ordinance.
"3C--Verify the accuracy of the language in Section 240-31.C.3(ww)[3]; as currently written, it may discourage flexibility in providing for the parking needs of each."
Note that 240-31.C.3(ww}[3] reads "No use shall be permitted in a Business Incubator that would cause the building to exceed the minimum off-street parking requirements pursuant to§ 240-33."
I spoke with Paul Farkas from CCPC for clarification on this recommendation. I explained that the intention behind this provision was to use the off-street parking requirements to prevent overcrowding in incubators, and that the Township's intent was to treat incubator businesses the same as any other use in the Township with respect to parking.
Mr. Farkas agreed that the Township's position on off-street parking for incubators was reasonable. He also observed that CCPC had some amount of difficulty analyzing our draft ordinance, as there are no municipal zoning ordinances specifically for business incubators in Southeast Pennsylvania.
The Planning Commission reviewed the revised ordinance at its meeting on April 3rd and passed a motion to send the draft ordinance back to the CCPC.
Recommended motion: Madame Chair, I move that we authorize staff to submit the revised draft business incubator ordinance to the Chester County Planning Commission.
U:\JAltshul\Memos to BOS\04232019 lncubators.docx
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. ---
AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE OF 1997, AS AMENDED, SECTION 240-6 TO ADD DEFINITIONS OF "BUSINESS INCUBATORS" AND "LIGHT INDUSTRY"; PROVIDE FOR BUSINESS INCUBATORS BY CONDITIONAL USE IN THE 1-1 LIGHT INDUSTRIAL DISTRICT (SECTION 240-19), IN THE 1-2 PLANNING BUSINESS, RESEARCH, LIMITED INDUSTRIAL USE DISTRICT (SECTION 240-20) AND IN THE BP BUSINESS PARK DISTRICT (SECTION 240-21); AND PROVISIONS IN SECTION 240-31.C.3 (CONDITIONAL USES) TO PROVIDE CRITERIA FOR BUSINESS INCUBATORS.
BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, that the East Goshen Township Zoning Ordinance of 1997, as amended, which is codified in Chapter 240 of the East Goshen Township Code, titled, "Zoning", shall be amended as follows:
SECTION 1. Section 240-6, titled, "Definitions", shall be amended to include the following definitions:
BUSINESS INCUBATORS-A building or portion thereof that offers shared or partially shared office, light industry and manufacturing and/or laboratory space, common facilities and shared support services to multiple entrepreneurial companies, the purpose of which is to nurture and develop start-up businesses into profitable enterprises.
LIGHT INDUSTRY-Manufacturing and production establishments which are free from emitting smoke, noise, vibration, odors, glare, hazards of fire and discharge of waste, with no outside storage of materials, equipment or products.
SECTION 2. Section 240-19.C of the East Goshen Township Zoning Ordinance of 1997, as amended, shall be amended by adding a new subparagraph (33) as follows:
(33) Business Incubator with uses and services that are permitted in this section by right or by conditional use and when specifically approved pursuant to §240-31.C.3.ww.
SECTION 3. Section 240.20.D of the East Goshen Township Zoning Ordinance of 1997, as amended, shall be amended by adding a new subparagraph (29) as follows:
(29) Business Incubator with uses and services that are permitted in this section by right or by conditional use and when specifically approved pursuant to §240-31.C.3.ww.
SECTION 4. Section 240.21.C of the East Goshen Township Zoning Ordinance of 1997, as amended, shall be amended by adding a new subparagraph (27) as follows:
(27) Business Incubator with uses and services that are permitted in this section by right or by conditional use and when specifically approved pursuant to §240-31.C.3.ww.
SECTION 5. Section 240.31.C.3 of the East Goshen Township Zoning Ordinance of 1997, as amended, shall be amended by adding a new subparagraph (ww) as follows:
(ww) Business Incubators in the 1-1 District pursuant to§ 240-19.C(33), in the 1-2 District pursuant to§ 240-20.0(29) and in the BP District pursuant to§ 240- 21.C(27). The following shall apply if an existing building, or a portion thereof, is to be converted or if a new building, or portion thereof, is built for Business
Incubator Use:
[1] The applicant shall list all anticipated future uses as part of its conditional use application. [2] Each tenant of a Business Incubator shall be required to have a Use and Occupancy permit prior to leasing space in the Business Incubator, but no separate conditional use application shall be required for any tenant, provided that any proposed use is consistent with the uses outlined in the original conditional use application.
[3] No use shall be permitted in a Business Incubator that would cause the building to exceed the minimum off-street parking requirements pursuant to§ 240-33.
SECTION 6. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of
Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
SECTION 7. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
2
SECTION 8. Effective Date. This Ordinance shall become effective in five days from the date of adoption.
ENACTED AND ORDAINED this __ day of ______ , 2019.
ATTEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
E. Martin Shane, Chairman
Carmen R. Battavio, Vice-Chairman
David E. Shuey, Member
Michael Lynch, Member
Janet L. Emanuel, Member
3
THE COUNTY OF CHESTER
COMMISSIONERS Michelle Kichline Kathi Cozzone Terence Farrell
Brian N. O'Leary, AICP Executive Director
Louis F. Smith, Jr., Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
PLANNING COMMISSION Government Seivices Center, Suite 270 601 Westtown Road P. 0. Box 2747 West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515
February 8, 2019
Re: Zoning Ordinance Amendment- Business Incubators, Industrial and Business Park Districts # East Goshen Township - ZA-01-19-15734
Dear Mr. Smith:
The Chester County Planning Commission has reviewed the proposed Zoning Ordinance Amendment as submitted pursuant to the provisions of the Pennsylvania Municipalities Planning Code, Section 609(e). The referral for review was received by this office on January I 0, 2019. We offer the following comments to assist in your review of the proposed amendment.
DESCRIPTION:
1. East Goshen Township proposes the following amendments to its Zoning Ordinance:
A. Add definitions for the following terms to Section 240-6: Business Incubators, and Light
Industry. B. Add business incubator with uses that are permitted by-right or by conditional use in the l-1
Light Industrial district to the list of uses permitted by conditional use in the I-1 district; C. Add business incubator with uses that are permitted by-right or by conditional use in the I-2
Planned Business, Research and Limited industrial District to the list of uses pe1mitted by conditional use in the 1-2 district; D. Add business incubator with uses that are permitted by-right or by conditional use in the BP
Business Park District to the list of uses permitted by conditional use in the BP district; and E. Add standards for Business Incubators in Section 240-3 I .C.3(ww).
COMMENTS:
2. We acknowledge that Economic Development Strategy 7.3 on page 7.l of the Township's 2015 Comprehensive Plan, which was prepared under the County Planning Commission's Vision Pattnership Program, is to allow for new uses and smaller incubator businesses in the corporate parks and the industrial park. "Prosper" Objective A of Landscapes3, the 2018 Comprehensive
Plan, is to promote a diverse industry base and flexible workplaces that can adopt to rapidly evolving market, demographic, and technological trends. Additionally, Landscapes3 supports flexible and appropriate zoning regulations to accommodate a range of development opportunities.
Email: ccplanning@chesco.org • website: www.chcscoplanning.org
Page: 2 Re: Zoning Ordinance Amendment- Business Incubators, [ndustrial and Business Park Districts # East Goshen Township - ZA-0 l-19-15734
3. We commend the Township for its efforts in implementing its Comprehensive Plan. We suggest that the Township consider the following issues in its review of the proposed ordinance language (the Township Solicitor should be requested to review the proposed ordinance language prior to
the Township taking official action on this amendment):
A. We suggest that, if a business incubator is proposed with only uses permitted by-right, then
the business incubator itself should be permitted by-right, rather than by conditional use. B. Section 240-31.C.J(ww)[I] states the applicant shall list all anticipated future uses as part of
its application. We suggest that this sentence be revised to state the applicant shall list all anticipated future uses and services as part of its application. C. The Township should verify the accuracy of the language in Section 240-3 I .C.3(ww)[3); as
currently written, it may discourage flexibility in providing for the parking needs of each business incubator tenant. D. The Township should verify the accuracy of the proposed definition of light industry,
particularly pc1iaining to the smoke, noise, vibration, odor, fire hazard and discharge of waste requirements; as currently written, it appears to be overly restrictive. E. The Township should identify if the existing signage regulations in the industrial and
business park districts will apply to business incubators, particularly pertaining to the individual tenant(s) of a business incubator. If signage is permitted for a tenant, consideration should be provided that such signage be limited to smaller-scale wall or projecting signs. F. The Township should determine, as pa.ii of its review process, the maximum number of tenants permitted within a business incubator, along with the minimum square footage allocated for each individual tenant.
RECOMMENDATION: The Township should consider the comments in this letter before acting on the proposed zoning ordinance amendment.
We request an official copy of the decision made by the Township Supervisors, as required by Section 609(g) of the Pennsylvania Municipalities Planning Code. This will allow us to maintain a current file copy of your ordinance.
Sincerely,
Paul Farkas Senior Review Planner
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/17/2019 To: Board of Supervisors d From: Mark Gordon, Township Zoning Officer Re: Land Development Application / ESKE Development LLC / Ducklings Early Learning Center
Board Members,
As you may recall, the Board of Supervisors heard and approved a conditional use application for a Child Day Care Center at 1302 Wilson Drive in November of 2018. ESKE Development LLC is the equitable owner and developer for the project and has submitted a
Land Development Plan and Application for review and approval.
The Planning Commission has reviewed the application over the last few months with the assistance of the CCPC and the Township Engineer and the PC has forwarded their recommendation to approve the plan.
The applicant is requesting one waiver from the SALDO; §205.1; requesting the Board of Supervisors approve the plans as a Preliminary/Final submission. This is a customary and routine waiver request for projects such as this, where CU approval proceeded the LO application and outside agency approvals are submitted but still outstanding.
STAFF RECOMMENDATION
Staff has no objection to the Board acting on this application at your meeting pending your discussion on the following items: #17 Sidewalks-The PC supports the plan without sidewalks along Wilson Drive for the following reasons.
1. There are no other sidewalks in the area. 2. Wilson Drive was not identified as a priority for pedestrian facilities when we discussed
Neighborhood Connections during Paoli Pike Corridor Master Plan. 3. At this time the PC does not believe there are enough pedestrian needs in this area to
support sidewalks along Wilson Dr. 4. The use will not generate pedestrian use along Wilson Dr.
The outstanding permits agency reviews for this project are:
1. NPDES permits through the Conservation District 2. DEP Stream Crossing Permit 3. Township Floodplain Permit
F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\Memo to BOS Re. LO App 04172019.doc
The remaining items are minor and staff will ensure that they are corrected and reflected in the final plans submitted for signatures. I have provided a draft motion for the Board's consideration.
DRAFT MOTION:
Madame Chairman, I move that the Board of Supervisors approve the Land Development application and plans and support the waiver request for ESKE Development LLC, for the development of a Child Daycare Center on the property located at 1302 Wilson Drive with the conditions outlined below. The Land development plans have been prepared by D.L.Howell and Associates Inc., dated January 11, 2019 and last revised March, 25, 2019, for the 13,815 s.f. Child
Daycare Center, associated driveway, stream crossing, parking, and storm water management.
1. The plan is approved as a Preliminary /Final Plan. 2. The Applicant shall address all remaining comments outlined in the Township Engineer's review letter dated 4/3/2019 prior to releasing the final plans for recording 3. The Plan shall not be released for recording until the applicant has submitted the land development and financial security agreements and the funds for the improvements. 4. The applicant shall pay the traffic impact fee of $396.25 for the Total New Trips for the project,
when building permits are issued, equaling $34,870. 5. Pursuant to East Goshen Municipal Authority Resolution No 22, the required sewer tap in fee will be $3,546.10. The 10% required is $354.61, and is due at the time when plans are released for recording, with the remaining balance due when building permits are
issued.
6.
The applicant shall submit the floodplain study to FEMA for review and acceptance. 7. The applicant shall implement the Conservancy Board Recommendations outlined in their letter to the Planning Commission dated 3/14/2019. 8. The applicant will follow all applicable federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted on the plans.
F:\Data\Shared Data\Property Management\53-3\53-3-l.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\Memo to BOS Re. LD App 04172019.doc
ARE.A CODE GIO
692-7171
April 12, 2019
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
I !$80 PAOLI PIKE, WEST CH ESTER, PA I $1380·6 I 119
Re: Land Development Application - Ducklings Learning Center 1302 Wilson Drive / ESKE Development - Tamara Building Systems
Dear Board Members:
At their meeting on April 3, 2019 the Planning Commission voted unanimously in favor of the following motion:
Mr. Chairman, I move that the Planning Commission recommend the Board of Supervisors approve the Land Development application and plans and support the waiver request for ESKE Development LLC, for 1302 Wilson Drive, prepared by DLHowell dated January 11, 2019 and last revised March 25, 2019, for a 13,815 s.f. Child Daycare Center, associated driveway, stream crossing, parking, and storm water management; with the following conditions:
1. The plan is approved as a Preliminary /Final Plan. 2. The Applicant shall address all remaining comments outlined in the Township Engineer's review letter dated 4/3/2019 prior to approval. 3. The Plan shall not be released for recording until the applicant has submitted the land
development and financial security agreements and the escrow funds for the improvements. 4. The applicant shall pay the traffic impact fee of $396.25 per trip for the project prior to the issuance of any building permit. 5. Pursuant· to East Goshen Municipal Authority Resolution No 22, the required sewer tap in fee will be $3,546.10. 10% of this, or $354.61, will be due at the time at the time of plan approval, with the remaining balance due when you collect your permits. 6. The applicant will follow all applicable federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted on the plans. 7. The applicant shall submit the floodplain study to FEMA. 8. The applicant shall implement the Conservancy Board Recommendations outlined in
their letter to the Planning Commission dated 3/14/2019.
Sincer-UL
Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\PC Rec to BOS 04112019.doc
EGOST 00127
Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
April 3, 2019
RE: ESKE Development, LLC, 1302 Wilson-Drive Preliminary/Final Land Development Review - 2nd Submission
Dear Mark:
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennonl.com
As requested, we have reviewed the following information, regarding the referenced revised submission:
• "Preliminary/Final Land Development Plans for ESKE Development, LLC" (15 sheet) dated January 11, 2019, last revised March 25, 2019, prepared by D.L. Howell;
• "Stormwater Management Report for Ducklings Early Learning Center" dated January 11, 2019, last revised March 25, 2019, prepared by D.L. Howell;
• "Floodplain Analysis Post-Development for Ducklings Early Learning Center" dated November 1, 2018, last revised March 25, 2019, prepared by D.L. Howell;
• Application and supplemental documents; and
• Response letter dated March 25, 2019.
The applicant, ESKE Development, LLC of West Chester, on behalf of the owner, S. Winig Associates of West Chester, is proposing to develop UPI 53-3-l.2C {4.0 acres) with a 13,815 SF child daycare center and 3,500 SF enclosed play area. Associated parking and stormwater management are proposed as well as a stream crossing for the main access to the property. The site is located on the south side of Wilson Drive (T-552) approximately 1,000 feet west of Boot Road (SR 2020), within the 1-1 Light Industrial District. The daycare
center will be served by public water and public sanitary sewer.
At the Board of Supervisors November 13, 2018 meeting the applicant received conditional use approval for the Child Daycare Center Use on the referenced property with conditions identified in the Board's November 15, 2018 letter.
The applicant has requested the following waiver:
1. From §205-1- requiring a separate preliminary plan submission.
The following comments from our February 27, 2019 review letter remains outstanding. (new comments in bold/italics)
EGOST00127 Mark A. Gordon, Zoning Officer
ZONING
April 3, 2019 Page 2 ESKE, 1302 Wilson Drive Land Development
1. The applicant shall confirm that a visual screen for all rooftop structures is provided per §240- 19.F(2).
Resolved per Note 26, Sheet 1. Codes staff will review in more detail at the time of building permit submission.
2. A permit is required from the Township for any construction within the identified floodplain. (§240- 26.B((2)(b))
Resolved. The applicant has indicated they will obtain the permits for the work within the floodplain.
3. The applicant should provide all information required by §240-26.B(3)(d)[l] with the application.
Resolved. The applicant has indicated they will obtain the permits for the work within the floodplain.
4. The applicant should provide cross sections of the proposed driveway and culvert and the elevation of the base flood on the plan. (§240-26.B(3)(d)[3][c])
Resolved.
5. The width of right-of-way for Wilson Drive shall be indicated on the plans per §240-27.A(3)(a). The Board of Supervisors may require additional right-of-way.
Resolved.
6. A minimum of 5% of a parking area shall be landscaped and continually maintained as such. (§240-
27.C(l)(c)) Please provide a calculation verifying this requirement has been met.
Resolved.
7.
Any additional off-street parking needed for the center shall be provided on the same lot as the
center. (§240-31.C(3)(i)[3]) The applicant should provide easement language acceptable to the Township Solicitor regarding the proposed parking on the adjacent property.
Resolved. The applicant has indicated an easement has been submitted. Note all easements are
subject to Township Solicitor review.
8. ADA ramps at the handicap parking shall be provided and the necessary details added to the plans. (§240-33.B(7)(b)) Please reference PennDOT standard details.
Resolved.
9. Per §240-33.B(7)(c), three (3) handicap parking spaces are required; only two (2) are proposed.
Resolved.
EGOST00127 April 3, 2019 Mark A. Gordon, Zoning Officer
Page 3 ESKE, 1302 Wilson Drive Land Development
10. All applicable PaDEP permitting will be required for the proposed crossing of the existing watercourse, wetlands and floodplain. (§240-26.8(4)(b)[l][b], §240-26.B(5)(a)[l] & §240-26.B(7)(b)[5])
Pending. The applicant has indicated General Permits have been submitted.
11. The applicant should confirm that all proposed utilities such as gas lines, electrical and telephone systems shall be located, elevated (where possible), and constructed to minimize the chances of impairment during a flood. (§240-26.B(5)(c)[4])
Resolved.
12. The applicant should address the requirements of §240-27.E regarding design controls for industrial park districts.
Resolved. Codes staff will review in more detail at the time of building permit submission. Note §240-27.E{S}, which states "the exterior facades of all buildings shall be finished in decorative masonry, brick, stone, glass or equivalent construction.''
SUBDIVISION AND LAND DEVELOPMENT
13. The applicant is proposing preliminary/final plan approval, therefore a waiver from §205.1 should be requested.
The applicant has requested a waiver.
14. Regarding landscaping and lighting: a. We recommend lighting be provided at the entrances to the building for safety purposes.
Resolved.
b. The plan should remove the term 'buffer' from the proposed landscaping, as a buffer is not required per the Code, and has specific, additional requirements that would need to be met.
Resolved.
c. The applicant has acknowledged the tree replacement requirements of §206-61.D, however a note stating "Applicant's surveyor located all trees 6" DBH and greater; the surveyor did not evaluate whether the existing trees were viable and noninvasive per the definition in SALDO section 205-7. The applicant would like to further evaluate the existing trees with participation from the Township's professional consultants." is provided on Sheet 14. Further review of the tree replacement requirement will occur pending clarification/coordination with the applicant's engineer. Please note the definition of "wooded lot" (§205-7) and the requirements of §205-61.C & 205-61.D.
Resolved.
d. Replanting shall occur on the wooded lot that is being developed or at another location within the Township that is acceptable to the Board of Supervisors. (§205-62.D(8)) The majority of landscaping is proposed on adjacent property.
EGOST00127 April 3, 2019 Mark A. Gordon. Zoning Officer
Resolved. This comment is no longer applicable.
Page 4 ESKE. 1302 Wilson Drive Land Development
e. The applicant has indicated the existing trees along Wilson Drive satisfy the street tree
requirement of §205-62. The Planning Commission and/or Board of Supervisors should confirm this requirement is adequately addressed; we have no objection.
Resolved. Additional street trees have been added at the request of the Conservancy Board.
15. Regarding preliminary and final plan requirements (§205-30 and §205-33), the following should be provided:
a.
The name of all abutting or adjacent property owners in the vicinity of the project including those across Wilson Drive. (§205-30.8(5))
Resolved.
b. The width of Wilson Drive. (§205-30.C(l)(a))
Resolved.
c. Such private deed restrictions and/or a statement of any restrictions previously imposed in accordance with §205-33.((2). If no such deed restrictions exist or will be imposed, it is recommended a note stating the same be indicated on the plan.
Resolved.
16. A 'will serve' letter regarding the availability of public water shall be provided. (§205-40.E)
Resolved.
17. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed.
Outstanding. Pending Planning Commission recommendation and Board of Supervisors decision.
18. A detail for the proposed driveway shall be provided, and the material per §205-57 .0(2) included.
Resolved.
19. All lot corners shall be clearly identified by either a monument or an iron pin. (§205-65.B)
Resolved.
STORMWATER MANAGEMENT
20. The disturbed area is greater than one acre. The applicant should provide an NPDES permit. (§195- 17.A(l)(b))
Pending.
EGOST 00127 Mark A. Gordon. Zoning Officer
April 3, 2019 Page 5 ESKE, 1302 Wilson Drive Land Development
21. Infiltration bed 1 has a stone invert of 431.00 feet. Test pits 3 and 4 were performed within the limits of Infiltration bed 1. The test pit log for Test Pit 3 indicates that, "During excavation, a solid layer of rock was encountered at a depth of approximately 9 feet below existing grade." The existing grade appears to be approximately 442.5 feet which indicates that the rock was encountered at an elevation of approximately 433.5 feet. The infiltration bed 1 invert indicated in the table on the detail on Sheet 6 is 431.00 feet. The infiltration bed does not appear to have the required 24 inches of separation from a limiting zone. The applicant should clarify. (§195-20.J(l}}
Resolved.
22. Where roof drains are designed to discharge to infiltration practices, they shall have appropriate measures to prevent clogging by unwanted debris (for example, silt, leaves and vegetation). Such measures shall include but are not limited to leaf traps, gutter guards and cleanouts. (§195-20.0}
Resolved.
23. All infiltration practices shall have appropriate positive overflow controls. The applicant should provide positive overflows in the infiltration beds. (§195-20.P)
Resolved.
24. The peak flow rate of the postconstruction two-year, twenty-four-hour design storm shall be reduced to the predevelopment peak flow rate of the one-year, twenty-four-hour-duration precipitation, using the SCS Type II distribution. The applicant should provide calculations demonstrating conformance with §195-21.A.
Outstanding. The applicant stated that calculations were provided but we were not able to locate them in the report.
25. Roadway crossings or structures located within designated floodplain areas shall be able to convey runoff from a one-hundred-year design storm consistent with Federal Emergency Management Agency National Flood Insurance Program Floodplain Management Requirements. (§195-24.E)
Resolved. We recommend the applicant submit full-sized plans contained in the Flood Study with the revision date of March 25, 2019.
26. Provide the complete delineation of the flow paths used for calculating the time of concentration for the predevelopment and postconstruction conditions on the drainage area plans. (§195-27.B(14))
Outstanding. The applicant provided the Tc flow paths on the predeveloped drainage area plan but did not add the Tc paths to the post-developed drainage area plan.
27. Identify the person responsible for ongoing inspections, operation, repair, and maintenance of the BMP or conveyance after completion of construction. (§195-27.B(18}(a})
Resolved.
EGOST 00127 Mark A. Gordon, Zoning Officer
April 3, 2019 Page 6 ESKE. 1302 Wilson Drive Land Development
28. Provide operation and maintenance requirements for the proposed BM P's on the plan. (§195-27.F(l) & §195-37)
Resolved.
29. The applicant is reminded that a Stormwater Management Operation and Maintenance agreement shall be completed. (§195-27.F.2 & §195-38) This document is available on the Township website. Please sign two copies and return to the Township for authorization by the Board of Supervisors. The Township will then return to the applicant for recording with the plan, at the County. A copy of the time stamped document and proof of recording should then be returned to the Township.
Acknowledged.
30. The plan should be revised to reflect the latest floodplain study information and location (11/1/18).
Resolved.
TRAFFIC
31. In response to comment #11 from the October 24, 2018 McMahon review letter, Heinrich & Klein Associates has provided right turn lane warrants for the proposed driveway. While warrants are
marginally met for a right turn lane, the design engineer notes that widening for a deceleration lane could not be accommodated along the property frontage and would impact the adjacent CALECO property. We recommend the applicant also complete warrant analyses for a left turn lane into the site. The existing road width would likely accommodate a left turn area into the site and/or into the adjacent MARS driveway. The applicant should provide lane striping alternatives along Wilson Drive to accommodate left turns into each driveway, considering the proposed driveway offset between the site and MARS driveways.
Resolved. The proposed access had been reviewed in detail with Township staff and the Planning Commission and has been determined to be acceptable based on existing constraints.
32. The plans should identify the student bus pick-up / drop-off area. The applicant should clarify is private buses will be utilized and stored on-site.
Resolved. The applicant indicated at the Planning Commission that private buses would not be utilized nor stored on site. However, if buses were to access the site, the turnaround provided is adequate.
SANITARY SEWER
33. We recommend the building sewer and lateral be increased in size from 4-inch to 6-inch since this is a commercial use and to increase ease of maintenance. (§188-31.8.(3))
Resolved.
EGOST00127 Mark A. Gordon, Zoning Officer
April 3, 2019 Page 7 ESKE, 1302 Wilson Drive Land Development
34. Township policy prohibits inside drop connections within manholes. To avoid disturbance to the manhole at all, we recommend the lateral connect directly to the sanitary sewer main approximately 5 feet downstream of the existing manhole in accordance with the Township's Sewer Lateral/Building Sewer Detail (see attached). The lateral can connect to the main at a 45° angle and run at that slope
to the easement line. The downstream cleanout needs to be provided at the easement line. The sewer can then be run at a consistent slope from the cleanout to the building.
Resolved.
35. A trap, vent, and building cleanout are required in accordance with the Township's Sewer Lateral/Building Sewer Detail.
Resolved.
36. The elevation view on Sheet 3 of the retaining wall plans, prepared by Shippee Engineering, dated February 1, 2019, indicate the invert elevation of the sewer lateral at the location of the
retaining wall as 426.94, which is not consistent with the calculated invert elevation of 428.98, based on the length, design slope, and invert elevations indicated on Sheet 3 of the land development plans.
Resolved, lateral location revised outside of wall.
GENERAL
37. During the conditional use process the applicant indicated parking restriction signage would be provided along the access drive, however no such signage is indicated.
Outstanding. Only one (1) No Parking sign is proposed; additional signs appear warranted. Perhaps two (2) signs (PennDOT R7-302} for each direction of travel, two near the entrance/culvert and two near the emergency access/parking lot.
38. We have received the retaining wall plans and calculations and will review following land development approvals. However, we have concerns about the constructability of the retaining wall,
notably, the minimal distance between the wall and the floodplain. Additionally, we recommend some form of erosion and scour protection at the bottom of the wall.
Pending. The applicant has acknowledged the comment and indicated erosion and scour protection will be provided as part of the retaining wall design. Please additionally address the sanitary sewer lateral in the vicinity of the wall at this time.
39. This review does not include a site signage review; all proposed signs will be review and permitted by Township staff.
Acknowledged.
40. Where parking is proposed immediately adjacent to sidewalks, we typically recommend curb stops be provided to prevent vehicle overhang and provide pedestrian access.
Outstanding. Two (2) spaces inadvertently do not indicate curb stops.
EGOST00127 April 3, 2019 Page 8 ESKE. 1302 Wilson Drive Land Development Mark A. Gordon, Zoning Officer
41. We recommend a crosswalk be provided for the proposed pedestrian crossing of the driveway.
Resolved. However, please update the callout for the crosswalk.
42. The proposed emergency access extends into existing parking spaces on the adjacent sites, potentially limiting its feasibility. A detail for the proposed emergency access should be provided.
Resolved.
43. We recommend the conditions noted in the Board's November 15, 2018 approval be indicated on the record plan.
Resolved.
44. Please additionally note the status of the following reviews/permits: a. NPDES Permit (PaDEP/CCCD) (§195-15.((2), -16.A, -17.A)- Pending
b. Planning Module (PaDEP) (§240-24.F, §205-33.B(22)(a)) - Planning module exemption approver per January 18, 2019 correspondence c. Sanitary Sewer (Municipal Authority) - Capacity/connection approved via February 11, 2019 correspondence d. On-lot Wells (CCHD) - Not applicable
e.
Highway Occupancy Permit (PennDOT) - Not applicable f. Fire/Emergency- Updated comments pending g. Historic Resource (Historical Comm.)-Correspondence has not yet been received h. Landscaping (Conservancy Board) - Recommended approval, with conditions, at their March 13, 2019 meeting. It is our opinion the plan adequately address the Conservancy Board's conditions. i. County Planning - February 14, 2019 letter
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
PENNONI L , Nathan M. Cline, PE Township Engineer
cc: Rick Smith, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail) ESKE Developments, LLC, c/o Anthony Diver, The Tamora Group (via e-mail) John A. Jaros, Esq., Riley Riper Hollin & Colagreco (via e-mail) Joseph Russella, PE, D.L. Howell (via e-mail)
Kristin Camp, Esq., Buckley Brion (via e-mail)
EAST GOSHEN
CONSERVANCY
March 14, 2019
East Goshen Township Planning Commission 1580 Paoli Pike West Chester, PA 19380
I I Re: 1302 Wilson Dr. / Land Development Application - Ch @ Dear Commission Members: .W
At their meeting on March 13, 2019 the Conservancy Board voted -
f
g-· · in favor of the fc_>llowing motion: h ·, · . , Mr. Chairman, I move that the Planning Commission consider the following recommendations for the landscaping proposed for the Ducklings Daycare Land
Development Plan:
1. The applicant shall provide a plan that identifies the trees to be removed and also shows the proposed construction and grading as well as the appropriate tree protection measures §205-63, for those trees that are not being removed and require protection. 2. To receive "street tree" credit for the trees along the Wilson Dr. frontage, the applicants LS architect shall evaluate the viability of the trees shown to remain. The applicant shall remove all the understory plants from the vicinity of the "street trees" to remain and show this new landscaped area on the plans. The applicant shall plant three new flowering dogwood trees (Corn us Florida) at the north east corner of the property along Wilson Drive to complete the street tree requirement. All these changes shall be shown on the LS plans. 3. The applicant shall agree to replace any of the existing trees along Wilson Dr. that a re proposed to remain as "Street Trees" if they are determined to non-viable after the removal of the invasive plants.
Sinc°;JL
Mark A. Gordon Zoning Officer
F:\Data\Shared Data\Property Management\53-3\53-3-l.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\CB Rec to
5 Pf 0a 1420p9- djl
c O L I P l K E , W E S T C H E S T E R , P A . 1 9 3 8 0
Michelle Kichline Kathi Cozzone
Terence Farrell
Brian N. O'Leary, AICP Executive Director
Government Services Center, Suite 270 601 Westtown Road P. 0. Box 2747
West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6S1S
February 14, 2019
Louis F. Smith, Jr., Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Re: Preliminary/Final Land Development - Ducklings Early Leaming Center # East Goshen Township -LD-01-19-15745
Dear Mr. Smith:
A Preliminary/Final Land Development Plan entitled "Ducklings Early Learning Center", prepared by D.L. Howell & Associates, Inc., and dated January 11, 2019, was received by this office on January 23, 2019. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.
PROJECT SUMMARY:
Location: Site Acreage: Lots/Units: Non-Res. Square Footage: Proposed Land Use:
New Parking Spaces: Municipal Land Use Plan Designation: UPI#:
PROPOSAL:
south side of Wilson Drive, east of Airport Road 4.00 I Lot 13,815 Child Daycare
60 Business Park Industrial 53-3-1.2C
The applicant proposes the construction of a 13,815 square foot early learning center, and 60 parking spaces. The project site, which will be served by public water and public sewer, is located in the I-1 Light Industrial zoning district.
RECOMMENDATION: The County Planning Commission recommends that the issues raised in this letter should be addressed, particularly the access and circulation issues and natural features protection issues discussed below, and all Township issues should be resolved before action is taken on this land development plan.
Email: ccplanning@chesco.org • website: www.chescoplanning.org
Page: Re: #
2 Preliminary/Final Land Development - Ducklings Early Learning Center East Goshen Township-LD-01-19-15745
COUNTY POLICY:
LANDSCAPES:
l. The project site is located within the Suburban Center Landscape and Natural Landscape designations of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Center Landscape is regional economic, population and transportation centers with varying land uses, accommodating substantial future growth of medium to high intensity. Repurposing obsolete structures and sites and encouraging sustainable development will be critical as suburban centers grow, and transportation infrastructure and amenities will need to expand to create an integrated multimodal network. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. While the proposed facility is an appropriate use in a Suburban Center Landscape, careful consideration of the proposed development activity is required due to the environmental constraints of the project site, which are discussed in comments #9 through # 12.
PorQf Info: Pare•Ì•): 5J-3-12C
(Mo11)Addross; 1302 Wison Or. Municipu1y: East Goshen T"'!>.
WATERSHEDS:
ftl1g1 Info: Oate Tekef!; 2014
Source: CCPC, 2017
,.,..p Futufn.::
CJPsrcel
r- Otho< Pare.I,
N +
Ho!r:TlltCCPC m•n l!YefY etbtto1111t"'9 llf& map I• lrH oftim,l'l bul 00ft ÍOliVilnw'IIH lie InÎ or U1 leMI""' lo be •palal!yOt letn90ltly l!CCVOt.,
2. Watersheds, the water resources component of Landscapes3, indicates the proposed development is located within the east branch subbasin of the Chester Creek watershed. Watersheds' highest priority land use objectives within this watershed are: reduce stormwater runoff, restore water quality of "impaired" streams, and protect vegetated riparian corridors. Watersheds can be accessed at www.chesco.org/water.
Page: 4 Re: Preliminary/Final Land Development - Ducklings Early Learning Center # East Goshen Township -LD-01-19-15745
adjoining parcel to the west as the primary entrance for both parcels, instead of constructing a second stream crossing.
4. The site plan indicates that an emergency access connection will be provided to the adjoining parcel to the west. However, the site plan indicates that the emergency access connection extends to an existing parking area, and it does not depict any modifications to the existing parking arrangement (any cars utilizing these parking spaces would block this emergency access connection). This should
be clarified by the applicant. We also suggest that the applicant and Township investigate the feasibility of an emergency access connection with the adjoining parcel to the south.
5. The Township's emergency service providers should be requested to review the plan to ensure that emergency vehicles will be able to safely navigate the proposed development when completed. We note that a vehicle turning plan is provided on Sheet 12.
6. The Zoning Information table on Sheet 1 indicates that the applicant is proposing 21 more parking spaces than required by the Township Zoning Ordinance (this figure does not include the 35 spaces identified on the adjoining parcel to the west as a "day care events" overflow parking area). We suggest that the applicant and the Township evaluate the actual anticipated parking demand for this facility, and determine whether the number of proposed parking spaces will be necessary. If fewer spaces are required, we suggest that the extra spaces could be landscaped and held in reserve instead of being paved. The reserve spaces could be installed in the future if it becomes evident that they are actually needed. Reserving parking spaces in this manner can help to reduce initial construction costs, limit the creation of impervious surfaces, and increase opportunities for landscaping.
Design Issues:
7. The site plan depicts the location of a sidewalk connection extending to the overflow parking area on the adjoining parcel to the west. However, this sidewalk extends to an existing parking area, and the site plan does not depict any modifications to the existing parking configuration in order to facilitate pedestrian access between these parcels. This should be clarified by the applicant.
8. The Township should verify that the design of the proposed outdoor lighting plan (Sheet 13)
conforms to Township ordinance requirements. The illumination should be directed inward from the periphery of the site and be oriented to reduce glare and visual impact on the adjoining roadways and land uses.
Natural Features Protection:
9. The plan depicts the location of both the Federal Emergency Management Agency (FEMA) floodplain elevation and the "calculated" floodplain elevation. The Township engineer should review the applicant's calculated floodplain boundary findings.
We note that the County Planning Commission does not support development in the floodplain, and the Federal Emergency Management Agency and Pennsylvania Department of Environmental Protection regulate filling or development in the floodplain. Development within a floodplain can increase the magnitude and frequency of normally minor floods, and present health and safety problems. The applicant should contact both of these agencies to determine if the proposed development activity wiJI require a permit. The Township should request documentation of these
contacts or permit(s) before approving the plan.
Page: 5 Re: Preliminary/Final Land Development - Ducklings Early Learning Center # East Goshen Township-LD-01-19-15745
10. The site contains areas of hydric (wet) soils (CpA Cokesbury and GIB Glenville) which have limitations to development. These limitations include drainage problems due to low permeability, low runoff rates and sub-surface saturation. When construction talces place on these soils, it interferes with the natural drainage of the land. On-site alterations to existing drainage patterns should be carefully inspected by the Township Engineer to insure that off-site drainage conditions are not negatively affected.
11. The site plan depicts the location of a 50 foot riparian buffer on both sides of the stream, and we note that the proposed driveway will traverse these buffer areas. The Township should confirm that the site plan complies with the riparian buffer requirements in the Township Code.
12. The site contains wetlands. Placement of fill in wetlands is regulated by the U.S. Army Corps of Engineers in accordance with Section 404 of the Clean Water Act (1977). The Pennsylvania Department of Environmental Protection regulates all activities that affect bodies of water, including wetlands, under Chapter 105 Rules and Regulations for the Bureau of Dams and Waterway Management. The applicant should contact both of these agencies to determine if future development activity will require a permit. The Township should request documentation of these contacts or permit(s) before approving the plan.
ADMINISTRATIVE ISSUES:
13. The Zoning Information table on Sheet 1 indicates that conditional use approval is required for this project. The final plan should accurately note the date and any conditions set as part of the conditional use approval, and the Township should verify that all applicable conditions of approval have been incorporated into the final plan.
14. The site plan depicts the location of easement areas for parking spaces, landscaping, and an overflow parking area on the adjoining parcel to the west (UPI# 53-3-l .2D). The details of these easements should be incorporated into the deeds of both lots.
15. The site plan depicts the location of two retaining walls, and site plan notes indicate that the design of these retaining walls will be provided "by others." We suggest that the design of these retaining walls be submitted for the review of the Township engineer, as part of this land development plan.
16. The Township should receive written confirmation that the applicant meets all licensing and registration requirements regulated by the PA Department of Public Welfare - Office of Children, Youth and Families, and any other applicable state regulations pertaining to child day care facilities.
17. We suggest that the applicant, in consultation with the business park owner, coordinate its proposed hours of operations with the other businesses in the business park, in order to mitigate any potential
vehicular conflicts amongst the various business park uses.
18. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (July 2013) and the associated Act 167 stormwater management ordinance standards adopted by each municipality.
•• t '
Page: 6 Re: Preliminary/Final Land Development - Ducklings Early Learning Center # East Goshen Township-LD-01-19-15745
19. The applicant should contact the Pennsylvania Department of Envirorunental Protection (DEP) to determine whether a stream encroachment permit is necessary for the proposed driveway crossing in accordance with Section 205.293 of its rules and regulations and provide the municipality with documentation of this contact and the requirements ofDEP before action on this plan is taken.
20. The applicant should contact the office of the Chester County Conservation District (CCCD) for information and clarification on erosion control measures. The provisions of the Commonwealth Erosion Control Regulations may apply to the project and may require an Earth Disturbance Permit or a National Pollutant Discharge Elimination System permit for discharge of stormwater from construction activities.
21. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.
This report does not review the plan for compliance to all aspects of yow· ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail.
cc: Eske Development LLC D.L. Howell & Associates, Inc. s Winig Associates L.P. Chester County Conservation District
Sincerely,
Paul Farkas Senior Review Planner
I I I @DLHowell
Civil Engineering & Land Planning www.DlHdw_ell:c6m
March 25, 2019
Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Reference:
Dear Mark:
ESKE Development, LLC, 1302 Wilson Avenue Preliminary/Final Land Development Review
We have prepared a response letter with a response to each of the conditions identified in the
Preliminary/Final Land Development Review Letter prepared by Pennoni dated February 27, 2019. The following explains how each condition was addressed corresponding to the numbered condition in the referenced review letter.
Zoning
1. A note has been shown under General Notes on the Land Development Plan for compliance with rooftop screening.
2. Permits will be obtained for work within the Floodplain. 3. Permits will be obtained for work within the Floodplain.
4. Cross sections have been added to the plans for the proposed driveway and culvert, and the elevation of the base flood has also been added to the plan.
5. The dimension for the width of the right-of-way for Wilson Drive. has been to the plans.
6. A calculation has been added to the plans to verify that a minimum of 5% of the parking area is landscaped and continually maintained as such.
7. An Easement with appropriate language has been submitted for proposed parking on the adjacent lot.
1250 Wright's Lane, West Chester, PA 19380 Phone: (610) 918-9002 - Fax: (610) 918-9003
www.dlhowell.com
ESKE Development, LLC, 1302 Wilson Avenue Page 2 of 5
8. The plans have been updated to show ADA ramps at the handicap parking spaces and the appropriate details have been added to the plans.
9. The plans have been revised to include three handicap parking spaces as required per
§240-33.B(?)(c).
10. General Permits, have been applied for and will be obtained for work associated with crossing the wetlands and work within the floodplain.
11. A profile of the driveway and culvert has been prepared and added to sheet 10 of the land development plans for review. All utilities crossing the stream are located above the culvert. The only utility located within the floodplain is a sanitary sewer lateral which connects to the sanitary sewer main, also located within the floodplain.
12. The requirements per §240-27.E., which regard to design controls for industrial park districts, has been addressed. The applicant has presented elevations and other information to the Township Planning Commission and Conservancy Board for their consideration.
Subdivision and Land Development
13. Comment acknowledged, a waiver from §205.1 will be requested for the plans to be submitted as Preliminary/Final.
14. Landscaping & Lighting: a. Lighting has been added to the entrances to the building. b. The term buffer has been removed from the proposed landscaping. c. The Landscape plan has been revised to remove mention of a wooded lot per
the comments by Mark Gordon. d. See comment 14c above. e. Additional street trees have been added as at the request of the Township Conservancy Board.
15. Preliminary/Final Plan requirements: a. The plan has been updated to show the names of all abutting or adjacent property owners in the vicinity including those across Wilson Drive. b. The plan has been updated to show a dimension for the width of Wilson Drive. c. A note has been added to sheet 1 under general notes.
16. A "Will Serve" letter has been provided by AQUA.
17. Sidewalk along Wilson Drive are not being proposed since no other sidewalk exist along Wilson Drive or within hundreds of feet of the site. We will ask the Board of Supervisors for their consideration.
ESKE Development, LLC, 1302 Wilson Avenue Page 3 of 5
18. A detail for the proposed driveway which shows the materials to be used has been added to the plans.
19. The lot corners have been updated to show pins to be added to the remainder of the unmarked lot corners and changes in direction.
Stormwater Management
20. A copy of the approval letter from the Conservation District shall be provided to the Township once received.
21. As discussed at our Staff meeting, The Township Engineer in conjunction with the CCCD and PADEP will allow the results of the testing performed within the limiting zone. The applicant explained that testing at the higher elevation was limited due to the
placement of fill associated with construction of the Caleco building. Once this area of soil is removed we expect similar testing results as the one obtained at the lower elevation.
22. The plans have been revised to provide cleanouts for the roof drains.
23. Each infiltration bed has been designed with an emergency overflow pipe to be used in the event of back to back 100 year storm events.
24 .. Calculations have been added to the stormwater management report to show that the 2-year SCS Post Developed runoff has been reduced to less than the 1-year SCS Pre Developed runoff.
25. The FEMA report for the calculated flood plain and culvert have been provided for review.
26. The complete delineation of flow paths used for calculating the time of concentration has been added to the drainage area plans.
27. The person responsible for ongoing inspections, operation, repair, and maintenance of the BMP or conveyance after completion of construction has been identified on the plans.
28. Operation and maintenance requirements for the proposed BM P's have been added to the plans.
29. Comment acknowledged, will comply.
30. The plan has been revised to reflect the latest floodplain study information and location.
Traffic
ESKE Development, LLC, 1302 Wilson Avenue Page 4 of 5
31. See response letter prepared by Heinrich & Klein Associates, Inc.
32. See response letter prepared by Heinrich & Klein Associates, Inc.
Sanitary Sewer
33. The building sewer and lateral has been increased from 4" to 6" in order to increase ease of maintenance.
34. The sewer lateral has been updated to connect directly to the sanitary sewer main approximately 5' downstream of the existing manhole at a 45° angle and runs at the existing slope to the easement line. The downstream cleanout has been provided to be shown at the easement line and the sewer has a consistent slope from the cleanout to the building.
35. The plans have been revised to provide cleanouts for the roof drains.
36. The plans and retaining wall designs have been compared and revised to be consistent with one another.
General
37. Parking restriction signage has been added to the plans along the access drive.
38. Comment acknowledged. Erosion and scour protection shall be provided as part of the retaining wall design.
39. Comment acknowledged. The signage shall be revised as necessary per the review by the Towns hip staff.
40. Curb stops have been added to the parking spaces that are immediately adjacent to sidewalks.
41. A crosswalk has been added to the plans for the proposed pedestrian. crossing of the driveway.
42. A detail for the proposed emergency access has been added to the plans.
43. The conditions noted in the Board's November 15, 2018 approval have been added on the record plan.
44. The ·status of the following reviews/permits is as follows: a. NPDES Permit - Ongoing b. Planning Module - APPROVED c. Sanitary Sewer - APPROVED d. On-lot Wells- Not Applicable
ESKE Development, LLC, 1302 Wilson Avenue Page 5 of 5
e. Highway Occupancy Permit - Not Applicable f. Fire/Emergency - Under Review g. Historic Resource - Not Applicable h. Landscaping - APPROVED i. County Planning - Addressed as part of this Resubmission
Conclusion
We trust that the above information and the attached revised plans satisfactorily address the concerns as stated in the review letter. If you have any questions, please do not hesitate to contact me at (610) 918-9002.
Sincerely,
D.L. Howell & Associates, Inc.
Joseph S. Russella, Jr.
Director of Operations
cc: Rick Smith, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail) ESKE Developments, LLC, c/o Anthony Diver, The Tamara Group (via e-mail) John A. Jaros, Esq., Rile Riper Hollin & Co!agreco (via e-mail) Kristen Camp, Esq., Buckley Brion (via e-mail) Nathan M. Cline, P.E., Township Engineer, Pennoni (via e-mail)
ROSSMORE HOMEOWNERS ASSOCIATION
427 Exton Commons Exton, PA 19341
(610) 363-1322 Fax(610)363-2310 Email: ccr@pcrmanaqement.com
www.ccrmanagement.com
March 28, 2019
Mr. Louis F. Smith, Twp Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Dear Mr. Smith:
APR 1 2019
Per East Goshen Township's Resolution 08-45, this letter is to notify you that the Board of Directors for the Rossmore Homeowners Association will be reducing their escrow account to $25,000.00, The Board clearly understands if the escrow account goes below $25,000.00, that a special assessment will be required of the homeowners to bring the account balance back up to the required amount of $25,000.00.
The 2/28/19 account balance is
Total to be withdrawn
$25,194.68 ($25,000.00) Escrow
$ 194.68
Enclosed please find the financial statement identifying the interest accrued through February 28, 2019. The Board will withdraw the interest in the amount of $194.68 and deposit it into the general operating fund, per Section 8. 7 of the Declaration of Easements, Covenants and Restrictions. Enclosed please find bank statement and financial information for your review and records.
If you have questions, please call. Thank you.
Regards,
Linda Bicking Director of Finance and Accounting
Enclosure
Cc: Board
Rossmore Homeowners Association
Balance Sheet As of February 28, 2019
Feb 28, 19
ASSETS
Current Assets
Checking/Savings
Checking, Union Bank M/M Cap. lmpr., Union Bank M/M Escrow, Union Bank M/M Operating, First Resource
M/M Operating, Union Bank M/M Reserves, First Resource M/M Reserves, Union Bank
Total Checking/Savings
Accounts Receivable
Accounts Receivable
Total Accounts Receivable
Other Current Assets
Accts Receivable, Other
Total Other Current Assets
Total Current Assets
TOT AL ASSETS
LIABILITIES & EQUITY
Liabilities
Current Liabilities
Accounts Payable
Accounts Payable
Total Accounts Payable
Other Current Liabilities
Accrued Expenses Escrow-Storm Water Facility
Total Other Current Liabilities
Total Current Liabilities
Total Liabilities
Equity
Capital lmpr, Current YE Capital Improvement Reserve Fund Balance Retained Earnings Net Income
Total Equity
TOT AL LIABILITIES & EQUITY
9,402.42 5,856.50 25,194.68 20,682.00 68,307.00 28,660.94 25,731.42
183,834.96
3,502.89
3,502.89
265.00
265.00
187,602.85
187,602.85
352.40
352.40
925.00 25,194.68
26,119.68
26,472.08
26,472.08
-13, 125.00
18,981.50 54,392.36 39,606.22 61,275.69
161,130.77
187,602.85
Memo East Goshen Township
Date: April 8, 2019 To: Board of Supervisors From: Rick Smith, Township Manager Re: Boot Road Restriping Project
Earlier this year we reached out to West Goshen Township to see if they would be interested in revisiting the Boot Road Restriping Project.
Under this project Boot Road would be restriped to a four lane cross section between Greenhill Road and Wilson Drive. There would be one east bound lane (coming from Route 202), a center left turn lane, and two westbound lanes {going towards Route 202). This would reduce the congestion that routinely occurs on Boot Road during the PM peak hour.
When this project was discussed a few years ago some of the residents of West Goshen who live on Boot Road expressed a concern that they would lose the shoulder in front of their homes. Recent discussions with Carroll Engineering indicate it would be possible to reduce the width of the travel lanes so that the existing shoulder could be maintained.
This work could be done pursuant to a Penn DOT Highway Occupancy Permit (HOP).
Attached is a joint motion by which both Boards of Supervisors agree to have Carroll Engineering prepare and for West Goshen to submit a HOP application to Penn DOT; and for the cost for this project to the split between the two townships.
Suggest Motion: I move that we adopt the joint Resolution authorizing Carroll Engineering to prepare and for West Goshen to submit a HOP application to Penn DOT; and for the cost for this project to the split between the two Townships.
F:\Data\Shared Data\Public Works Dept\Roads\EGT & WGT Projects\Boot Road\2019\Memo to Bos 040819.docx
JOINT RESOLUTION
TOWNSHIPS OF EAST GOSHEN AND WEST GOSHEN
CHESTER COUNTY, PENNSYLVANIA
EAST GOSHEN RESOLUTION NO. 2019 - ----
WEST GOSHEN RESOLUTION NO. - 2019 -----
WHEREAS, Boot Road (S.R. 2020} traverses East Goshen and West Goshen Townships; and,
WHEREAS, the section of Boot Road between Wilson Drive (T.R. 552) in East Goshen Township
and Greenhill Road (S.R.2018) in West Goshen Township experiences congestion during the
evening peak hour; and,
WHEREAS, the Boards of Supervisors of East Goshen and West Goshen Township believe it is in
the public interest to take steps to reduce this congestion; and,
WHEREAS, Carroll Engineering Corporation has determined that the congestion could be
reduced by restriping the section of Boot Road between Wilson Drive and Greenhill Road to a
four lane cross section consisting of one east bound lane, two west bound lanes and a center
turn lane, while maintaining the existing shoulder on the south side of Boot Road; and,
WHEREAS, Carroll Engineering Corporation has advised that the restriping can be accomplished
pursuant to a Highway Occupancy Permit from the Pennsylvania Department of Transportation;
and,
WHEREAS, the Boards of Supervisors of East Goshen and West Goshen hereby authorize Carroll
Engineering Corporation to prepare and West Goshen Township to submit the aforementioned
Highway Occupancy Permit to the Pennsylvania Department of Transportation; and,
WHEREAS, the Boards of Supervisors of East Goshen and West Goshen hereby agree to equally
split all costs for this project.
(Signatures on next page)
RESOLVED, this ____ day of ________ 2019.
East Goshen Township
Attest Signatures
RESOLVED, this ____ day of ________ 2019.
West Goshen Township
Attest Signatures
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2019\Boot Road Restriping.docx
Memo East Goshen Township
Date: April 8, 2019 To: Board of Supervisors From: Rick Smith, Township Manager Re: Emergency Communication Ordinance (aka Radio Booster Ordinance)
Attached is a copy of the letter that was sent to the property owners about the informational meeting on the 2?1h_ As result of this letter I received a few comments from property owners. In addition I also received comments at the Large Business Roundtable Breakfast and at the meeting on the 2?1\ all of which are summarized below.
1. Comment - Have a portable booster unit that could be deployed as necessary.
Response - The Chester County Department of Emergency Services tested a portable booster and found that the use of this type of device is both not practical
(due to the time it would take to deploy the booste,) and is ineffective (the building construction has a significant impact on the radio signal so a booster may not reach all parts of a particular building).
2. Comment - Have the County install additional antennae.
Response - It would be cost prohibitive to install additional radio antennae through-out the County.
3. Comment - What are other government entities doing about this issue?
Response - This ordinance has been adopted by East Bradford, East Pikeland, East Whiteland, Schuykill, Thornbury, Tredyffrin, Uwchlan, West Goshen, West
Whiteland, and Willistown Townships and West Chester Borough.
4. Comment- The time frames for testing and installation are too short.
Response - Will address in the ordinance,
5. Comment- Reliability of the equipment.
Response - This equipment, much like the fire alarm system and sprinkler system, will be required to be inspected and tested on a regular basis.
6. Comment- Cost of the equipment.
Response - Will address in the ordinance.
7. Comment-The exemptions are unclear
Response - Will address in the ordinance.
With regards to the comments 4, 6, and 7; I revised the ordinance to allow the owners of existing buildings to have 120 days to perform the testing (originally 60 days) and 18
months (originally 12 month) to install the equipment.
These changes along with some other minor changes are included in the attached ordinance.
I would suggest that the Board schedule a hearing on the proposed ordinance for the second meeting in June. I would also suggest sending a second letter to the effected property owners advising them of the hearing and provide them with a copy of the ordinance.
Motion - I move that staff adve1iise a public hearing on June 18, 219 for the Emergency Communication Ordinance, and that a letter for sent to the effected property owners advising them of this hearing.
F:\Data\Shared Dala\Admin Dept\Township Code\Raclio Booster Orclinance\Memo to BoS 032819.doc
610-692-7171 www.eastgoshen.org
February 22, 2019
Dear Property Owner:
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
In September of last year, the Westtown-East Goshen Regional Police Department responded to a shooting at the Bellingham Retirement Community in East Goshen Township. As the police officers were looking for the shooter, they soon realized that when they went into the basement of the building, they lost radio contact with the County Radio Room and other officers. Fortunately, the shooter had fled the scene and this lack of communication did not result in an injury to one of the officers. However, if the shooter was hiding in the basement,
we could have had an entirely different result.
The reason for this is simple: Years ago, most police and fire company radios operated on one of the lower radio frequencies. A significant advantage of these lower frequencies was their ability to go through the walls and floors of most buildings. A disadvantage was that they were limited with regards to the amount of information that could be transmitted.
Several years ago, the Federal Communications Commission decided to reassign the emergency service providers to a higher frequency. While the higher frequencies have more bandwidth, which allows the emergency service providers to transport significantly more dKta, it has a significant flaw - the higher frequencies do not penetrate the walls and ceilings of buildings very well, as evidenced by what happened at Bellingham last September. The only way to provide adequate radio coverage in these large buildings is to install an amplifier.
The purpose of this letter to advise you that the East Goshen Township Board of Supervisors intends to adopt an ordinance in 2019 that will require the installation of these amplifiers in those buildings that do not have adequate radio coverage. The Board recognizes that this will impose a financial burden on the owners of these buildings. Accordingly, the ordinance includes the following process, which will allow the property owners to budget for the installation of these amplifiers:
Upon adoption of the ordinance, property owners will be notified that they have sixty (60) days to have the radio coverage in their building tested by a licensed technician. There are a number of firms that can perform this service. The cost for this testing will vary depending on the size and complexity of the building.
The building owners shall provide a copy of the test results to the Township. If the test results indicate that the building has adequate radio coverage, no further action is required by the property owner. However, if the test indicates that the coverage is inadequate, the property
owner shall have a period of one year to install the required equipment. As noted previously,
the Board of Supervisors does not take the imposition of this requirement lightly, but the safety of our emergency services personnel, such as police, fire, and EMT is paramount.
The Board will be conducting a presentation and Q&A session on this matter on Wednesday March 27, 2019 at 7:00 PM at the Township Building. I have enclosed a copy of the proposed ordinance for your review.
Sincerely,
fc_v,0
Louis F. Smith, Jr. Township Manager
F:\Data\Shared Oata\Admln Otpt\Townshlp Code\Radlo 8oosttr Ordlnana,\letterto Property Owners 022219.docx
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. ___ _
AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP CODE TO ADD A NEW CHAPTER 119 TITLED "COMMUNICATION AMPLIFICATION SYSTEMS" TO ESTABLISH MINIMUM REGULATIONS APPLICABLE TO EMERGENCY COMMUNICATIONS SYSTEMS IN CERTAIN BUILDINGS WITHIN EAST GOSHEN TOWNSHIP.
WHEREAS, the Board of Supervisors of East Goshen Township ("the Board") finds that the ability of police, fire, ambulance, and other emergency providers and personnel to communicate with each other within buildings and structures, and to communicate from within structures and buildings to personnel and locations outside the buildings and structures is of vital public importance; and
WHEREAS, a breakdown in communications among emergency providers and personnel creates a serious risk of harm to and is a serious threat to the safety and welfare of emergency personnel, the citizens of East Goshen Township, and the public in general; and
WHEREAS, the Board has previously adopted the Statewide Building Code, referred to as the Pennsylvania Uniform Construction Code ("UCC") and, as part of the UCC, adopted a Building Code which is codified in Chapter 100 of the East Goshen Code, and an Existing Building:::i Fire Prevention Code _which is codified in Chapter L143 of the East Goshen Code; and
WHEREAS, Section 510.1 of the BuildingFire Prevention Code requires that all buildings have approved radio coverage for emergency responders within the building; and
WHEREAS, Section 510.2 of the Building Code and Section 1103.2 of the Existing BuildingFire Prevention Code require existing buildings that do not have approved radio coverage for emergency responders within the building based upon the existing coverage levels of the public safety communication systems at the exterior of the building to be equipped for such coverage;
NOW THEREFORE, pursuant to the Board's power to adopt ordinances necessary for the proper management, care, and control of the Township and the maintenance of peace, health, and welfare of the Township and its citizens pursuant to Section 1506 of the Second Class Township Code, 53 P.S. §66506, and pursuant to the aforementioned sections of the Building Code and Existing BuildingFire Prevention Code, the Board enacts and ordains as follows:
SECTION 1. A new Chapter 119 titled "Communication Amplification Systems" shall be adopted and codified in the East Goshen Township Code as follows:
CHAPTER 119- COMMUNICATION AMPLIFICATION SYSTEMS.
§ 119.1. Definitions.
The following words and terms shall, for the purposes of this chapter, have the meanings shown herein:
APCO - Association of Public Safety Communications Officials International
CCDES - Chester County Department of Emergency Services
FCC - Federal Communications Commission
FIRE DEPARTMENT- The Goshen Fire Company or Malvern Fire Company, or their respective successor fire companies who provide fire protection services to the Township. The term includes any other fire company or other emergency
medical services unit providing intermittent coverage to the Township.
LICENSED TECHNICIAN - A person in possession of a current FCC technician license or a current technician certification issued by the APCO
NPSPAC - National Public Safety Planning Advisory Committee
POLICE DEPARTMENT- The police department operating under the direction of the Westtown-East Goshen Police Commission
§ 119.2. General Provisions.
A. Except as otherwise provided, no person shall erect, construct, alter, refit, change the use of, or provide an addition of more than 20% of the existing floor area to any building or structure or any part thereof, or cause the same to be done which fails to support adequate radio coverage for CCDES, the Fire Department, and the Police Department. For the purposes of this section, adequate radio coverage shall include all of the following:
(1) A minimum signal strength of -95 dBm available in 90% of the area of each floor of the building when transmitted from the closest CCDES radio communications system site;
(2) A minimum signal strength of -95 dBm received at the closest CCDES radio communications site when transmitted from 90% of the area of each floor of the building;
2
(3) The frequency range which must be supported shall be between 763 MHz and 861 MHz;
(4) A 90% reliability factor; and
(5) Signal strength measurements, for the purpose of measuring the performance of a bi-directional amplifier, shall be based on one input signal adequate to obtain a maximum continuous operating output level.
The provisions of this Section 119.2 shall become applicable upon issuance of a building and/or zoning permit by the Township for the erection, construction, alteration, change of use, or addition of more than 20% of the existing floor area to an existing building or structure. Within thirty (30) days after the proposed construction or change of use is completed, the property owner shall perform or cause to be performed by a
Licensed Technician, a test conducted in accordance with the testing procedures in Section 119.4.A herein to determine if the entire building or structure has adequate radio coverage as defined herein. The property owner shall provide a copy of the test results to the Township. If the test results reveal that the entire building or structure does not have adequate radio coverage, the property owner shall have ninety (90) days from the date of written notification from the Township to enhance radio coverage and bring it within the acceptable limits of the provisions of this ordinance.
§ 119.3. Amplification Systems Allowed.
Buildings and structures which cannot support the required level of radio coverage shall be equipped with either a radiating cable system or an internal multiple antenna system with or without FCC-type accepted bi-directional 700/800 MHz amplifiers as needed. If any part of the installed system or systems contains an electrically-powered component, the system shall be capable of operating on an independent battery and/or generator system for a period of at least twelve (12) hours without external power input. The battery system shall charge in the presence of an external power input.
§ 119.4. Testing Procedures.
A. Acceptance Test Procedure. When an in-building radio system is required, and upon completion of installation, it will be the building owner's responsibility to have the radio system tested to ensure that two-way coverage on each floor of the building is a minimum of 90%. Each floor of the building shall be divided into a grid of approximately twenty (20) equal areas. A maximum of two (2) nonadjacent areas will be allowed to fail the test. In the event that three (3) of the areas fail the test, in order to be more statistically accurate, the floor may be divided into forty (40) equal areas. In such event, a maximum of four (4) nonadjacent areas will be allowed to fail the test. After the forty (40) area test, if
the system continues to fail, the building owner shall have the system altered to meet the 90% coverage requirement. The test shall be conducted using the most current portable radio (or its equivalent) available to the Police Department
3
and/or Fire Department, talking through the CCDES as specified by the authority having jurisdiction. A spot located approximately in the center of a grid area will be selected for the test, and the radio will then be keyed to verify two-way communications to and from the outside of the building through the CCDES. Once the spot has been selected, prospecting for a better spot within the grid area will not be permitted.
The gain values of all amplifiers shall be measured and the test measurement results shall be kept on file with the building owner so that the measurements can be verified each year during the annual tests. In the event that the measurement results become lost, the building owner will be required to rerun the acceptance test to reestablish the gain values.
B. Annual Tests. When an in-building radio system is required, at a minimum of once every twelve (12) months, the building owner shall test all active components of the system, including but not limited to amplifiers, power supplies, and backup batteries. Amplifiers shall be tested to ensure that the gain is the same as it was upon initial installation and acceptance. Backup batteries and power supplies shall be tested under load for a period of one (1) hour to verify that they will properly operate during an actual power outage. If within the one (1) hour test period, in the opinion of the testing technician, the battery exhibits symptoms of failure, the test shall be extended for additional one (1) hour periods until the testing technician confirms the integrity of the battery. All other active components shall be checked to determine that they are operating within the manufacturer's specifications for the intended purpose.
C. Five-Year Tests. In addition to the annual tests, the building owner shall perform a radio coverage test at a minimum of once every five (5) years to ensure that the radio system continues to meet the requirements of the original acceptance test. The procedure set forth in 119-4.B shall apply to such tests. D. Qualifications of Testing Personnel. All tests shall be conducted, documented, and signed by a Licensed Technician. All test records shall be retained on the inspected premises by the building owner and a copy submitted to the Township.
§ 119.5. Field Testing.
Police and fire personnel, after providing reasonable notice to the owner or the owner's representative, shall have the right to enter the property to conduct field testing to be certain the required level of radio coverage is present.
§ 119.6. Exemptions.
This chapter does not apply to: structures the following:
A. Buildings in Use Groups R-3 and R-4+--aRY (as defined in the Township Building Code):
4
_B_. __ A_n_._y building constructed of wood frame; and/or any
C. Any building with a building height of thirty-five (35) feet ¤or less, as long _(as none of the aforementioned measured in accordance with the Township Building Code);
=D-"-. --'T'-'-h=e buildings listed in Subsections A, B, and C above are exempt from the
requirements of this chapter provided they do not make use of any metal ___ construction or utilize any underground storage areas or parking areas.
E. For the purposes of this chapter, parking structures-aoo .. stairwells are included in the definition of "building" and stair shafts are included in the definition of "a-Ubuilding" or "any parts of a building," but elevators may be excluded.
§ 119.7. Existing Buildings and Structures.
Any non-exempt building or structure existing, under construction, or for which a building permit application is pending or has been approved as of the effective date of
this Ordinance, shall comply with the requirements of this Ordinance. Within ¥ -(eQone hundred (120) days of written notification from the Township, the property owner
shall perform or cause to be performed by a Licensed Technician, a test conducted in accordance with the testing procedures in Section 119.4.A herein to determine if the existing building or structure has adequate radio coverage as defined herein. The property owner shall provide a copy of the test results to the Township. If the test results reveal that the existing building or structure does not have adequate radio coverage, the property owner shall have a period of one yeareighteen (18) months from the date of written notification from the Township to enhance radio coverage and bring it within the acceptable limits of the provisions of this ordinance. Upon completion of the installation of a booster or other radio enhancements to the building to provide adequate radio coverage, the property owner shall send written notice to the Township. The Township may conduct its own field tests pursuant to Section 119-5 to confirm
compliance. Upon good cause shown, the Township may approve an extension of time to bring the existing building or structure into compliance and provide adequate radio coverage.
SECTION 2. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal, or invalid, such unconstitutionality, illegality, or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the
Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal, or invalid sentence, clause, section, or part thereof not been included herein.
SECTION 3. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
5
SECTION 4. Effective Date. This Ordinance shall become effective five days following enactment.
(Signatures on next page)
6
ENACTED AND ORDAINED this __ day of ______ , 2019.
ATTEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
Janet L. Emanuel, Chairwoman
E. Martin Shane, Vice-Chairman
Carmen R. Battavio, Member
Michael P. Lynch, Member
David Shuey, Member
I F:\Data\Shared Data\Admin Dept\Township Code\Radio Booster Ordinance\487730 LAW 021J1Q 040819.docx
7
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610·692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/17/2019 To:
From: Cc:
Re:
Board of Supervisors Mark Gordon, Township Zoning Officer Mark Miller, Public Works Director Goshen Parkway Sidewalk
Board Members,
.)I 1, i vJ \. I
I have been approached by Johnson and Johnson/ DePuy Synthes with their desire to install a sidewalk within the Right of Way of Goshen Parkway, in order to connect their facilities in the corporate park for pedestrians, at their expense. The sidewalk would run along the outside perimeter of the road and connect all of the parcels on Goshen Parkway. I have included a copy of the plan for your review.
They propose a rubber porous pavement surface material. I'll have an example of the material for you to look at during the meeting.
I have forwarded the concept plan to the Township Engineer; he has responded with several engineering questions however he supports the concept.
Staff is impressed with the concept however we have a number of questions and concerns.
STAFF RECOMMENDATION
Staff recommends that we set up a meeting to discuss the project with J&J.
DRAFT MOTION:
I move that we direct staff to set up a meeting with J&J, the Township Engineer, and two members of the Board to discuss the Goshen Parkway sidewalk concept plan.
F:\Data\Shared Data\Public Works Dept\Goshen Parkway Sidewalk 2019\Memo to BOS Re. Goshen Parkway Sidewalk 04172019.doc
610-692-7171
www.eastgoshen.org
April 12, 2019
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
To: Board of Supervisors
From: Mark Miller
Re: Tar Buggy
We budgeted to replace our Tar Buggy this year in the amount of $12,000.00. The existing tar
buggy was purchased in 2001, has no salvage value and will be scrapped.
I received quotes from two COSTAR vendors:
Asphalt Care $13,000.00 Municipal Supply $15,000.00
I would recommend purchasing the unit from Asphalt Care in the amount of $13,000.00
F:\Data\Shared Data\Public Works Dept\Equipment Purchases 2019\Tar Buggy purchase 4-12-19 .docx
610-692-7171
www.eastgoshen.org
April 12, 2019
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
To: Jon Altshul
From:
RE:
Mark Miller
Payment Application #1- F.W. Houder, Inc Wash Bay Project
The Engineer and I have reviewed and recommend the release of Payment Application #1 for
F.W. Houder, Inc in the amount of $91,883.20. This release covers the following items:
Mobilization General Conditions Excavation Foundation, rebar Masonry Electrical Bond
Total release $91,883.20. Balance to finish including $9,764.80 in retain age $501,764.80
F.W. Houder, Inc. 183 Lancaster Avenue Suite 200
Malvern, Pa 19355
R'IE
REMINGTON &VERNICK ENGINEERS ---1901--
April 4. 2019
East Goshen Township 1508 Paoli Pike West Chester, PA 19380-6199
Attn: Mr, Rick Smith
Re:
Township Manager
East Goshen Township East Goshen Township Wash Bay
Payment Application #1 Our File #PCEGT00I
Dear Rick:
922 Fayette Street Conshohocken, PA 19428
0: (610) 940-1050 F: (610) 940-1161
APR 11 LJ19
Enclosed, please find two (2) copies of AIA Application and Certificate for Payment# I and weekly payroll certifications.
We recommend payment to the contractor in the amount of$91,883.20. The amount of$9,764.80.
Please review and process for payment to Highway Materials, Inc. Should you have any questions please feel free to contact our office (610) 940-1050.
Very truly yours, Remington & Vernick Engineers
Christopher J. Fazio, P.E., C.M.E. Executive Vice President
cc: Mark Miller, Director of Public Works Thomas F. Beach, P.E., C.M.E., Executive Vice President Kenneth Ressler, P.E., Structural Department Head Raymond Ruczynski, Jr., Manager of Construction Inspection Services
s:\east goshcn township\pcegtOOI • building renovations\constructlon managcmcnt\paymcnts & chmtgc orders\pcegtOOI • 2019.04.04 payment
application # I.doc
www.rve.com
AIA Type Document Application and Certification for Payment
'l'O: EAST GOSHEN TWP 1580 PAOLI PIJCE PROJJCC'l' J BAST GOSHEN ƙ WASH BAY
1580 PAOLI PIO APPLICATZOR lllO: 1
PERIOD TO, 03/21/19
JOB 1'0: 000532 XNVOICE RO: 53201
APP.DATE: 03/21/19
AJlCBIDC'l'S PROJEC!'l' RO•
DIS'l'RJ:BO'l'IOR TO: WEST CBJ!!S'l'D, PA 19380 WES'l' CHESTER, PA 19380 _OWlUR
FROM ( CONTRACTOR) : 'I. W. BOtJ])EJt, IlfC. 183 LANCASTER AVENOE StJJ:TE 200 MlUiVERR, PA 19355
com.'JlACT FOR:
VIA(MCKITEC'l') J
CONTRACTOR'S APPLICATION FOR PAYMENT
ApplicaUon is made for payment. as shown below in connection \\4th 1he Contract rn".'"' l!;lltinn C::hGG+ 41.6 Tƚmo n,v., ffY'!Ont iƛ Ɯff.orh.arf 1.0RRGnmL CON'l'RAC'l' SUM ••••••••••••••••• $ 593,648.00
2.Net Change by Change Order •••••••••••• $ 0.00
3.CON'l'.RAC'l' SOM TO DA'l'E(line 1 + 2) •••••• $ 593,648.00
4.TO"I'AL COMPLETED AND STORED 'l'O DATE •••• $ 101,648.00
5. RE'l'llNAGE: a. 10.0000 % of Coq>leted Work
b. 0.0000 % of Stored Material
$ 9,76'.80
$ 0.00
Total retainage(line Sa+Ɲ>•••••••••••••••·····$ 9,764.80
6.'l'O'l'AL EARNED LESS RETAINAGE ••••••••••• $ 91,883.20 (line 4 leas line S Total)
7.LESS PREV:tOUS CERT:CFXCATES FOR PAYMENT (line 6 frca prior Certificate) •••••••••• •••••.$ 0. 00
8.CURREN'l' PAYMEN'l' DUE ••••••••••••••••••• $ 91,883.20
9.BALANCB TO FINISH, l:NCLUDXNG :RETllNAGE (line 3 lesa line 6) $ 501,764.80
CHANGE ORDER SOMNARY Al>DITXONS DBI>t7C'1':IORS
Total changes -wrcwed in
px-evi011a month• by OWner o.oo
Total apprƞ this month o.oo
TOTALS o.oo o.oo
m!:'1' CHNQGES by Change Order 0.00
_ ARCHITEC'l' - C01fi'RAC1.'0R
COIITRAC'l' DATE,12/18/18
-------- The undersigned contractor certifies thut to 1he best of Contractots knowledge, Information and belief the work covered by this Application for Payment has been completed in accordance with the Contract Doruments, that all am0l6!ts have been paid by Contractor for Work for which previous Certificates for Payment were Issued and Payments received from the Owner, and that current payment shown herein is now due.
COlft'Mc.l'OR: F :,-'II. HO!JDI: :me. 183 Ɵ.AVBROE 200 /'MALVERN,
By: ''-.J1/' t v' ·'#4t-
PA 19355
State of: Pezmsylvania
Couzaty ofJ Cb••ter
Subscribed. and SWorn to befo:
Date1 3-2,-\4
c;ommonweallh ot Pennsylvania - Notary Seal
Brenda McCracken. Notary Public
Chesrer County My commission expires July 3, 2022
,mission number 1248960
Notary Pw>licr Brenda Mc:Cracken
ICY Ccnmission Expirear 07/03/22
ARCHITECT'S CERTIFICATE FOR PAYMENT
In accordance with the contract documents, based on-site observations and the data comprising the above Application, the Architect certifies to the Owner that to the best of the Architect's knowledge. information and belief the Work has progressed as indicated, the quality of the Work is in accordance with lhe Contract Documents, and that the Contractor Is entitled lo payment of the
AMOUNT cERTIFIED .......................................... s q I B 83 20 (Attach explanation If amount certified differs from the amount applied for initial all figures on this Application and on the Continuation Sheet that are change to conform to the amount certified.) =
Date: 0'-1/ () 2. /,9
ARCHITECT: :::::::-==---==: 'J ,-. / By: c::: =----- Date: __ r..,,_, ·,c...._r .... .__....,... __ This Certificate is not negotiable. The AMbtim CERTIFIED, is payableonly to the Contractor
named herein. Issuance, payment and acceptance of payment are v.ithout prejudice to any rights of the Owner, or Contractor under this Contract.
AJ:A Type Document Application and Certification for Payment
'1'0: EAST OOSUN 'i'WP 1580 PAOLJ: PIU Pl!OJEC'l': BA!r.1' GOSDllt TWP WASH BAY
1580 PAOLI PllCE APPLXCA'J.'ION RO: 1
PEIUOD '1'0: 03/21/19
JOB RO: 000532 XNVOICE 1110: 53201
APP.DA'l'J:1 03/21/19
ARCl!n'ECTS PR.OJ2C'l' IIO •
D:ISTRIBtJ'l'ION '1'01 QST CHEffER, PA 19380 NEST CHESTER, PA 19380 _Olml!lR
FROM ( CONTRAC'l'OR) : F. W. BOUDER, XNC.
comRAC'l' l!'ORI
183 UUICASTER AVENOZ SUl'.'l'E 200 MAI.VERB, PA 19355
VXA(ARCJU'l'ECT):
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below in connection with the Contract r..,.,..._, ..:.M" C::hAaf 6 t 6 Tuno n,v-.11mcnt tc- <0f"h.::.A 1.0RJ:GINAL COR'l'RAC'l' SUM ••••••••••••••••• $ 593,648.00
2.Net Change by Change Order •••••••••••• $ 0.00
3.CON'l'RAC'l' SUM TO DATE(line 1 + 2) •••••• $ 593,648.00
4.Tm!AL COMPLJrl'BD ARD S'l'ORBD TO DATE •••• $ 101,648.00
5. RETAJ:l!IAGE: *- 10.0000 % of CclnlDletec! worlt $ 9,76'.80
b
.
.!!..:.!!,lli % of Store4 Material $ 0.00
'J.'otal retaizlage(liue Sa+Sb) •••••••••••••••••••• $ 9,764.80 6.'l'O'l"AL B.llWED LBSS RB'l'AJ:NAGE ••••••••••• $ 91,883.20 (line, 1••• line S 'l'otal)
7 • LBSS PREVJ'.OUS CEll'l'U'ICATES !'OR PAYME11'1' (li- 6 fron prior Cextific::ate) •••••••••••••••• $ 0.00 8.CtJRRBm.' PAYMENT DOB ••••••••••••••••••• $ 91,883.20
9 • BALANCE TO Fl:NJ:SH, IR'CLUDnlG RETllNAGE (liJ:1e 3 lea■ line 6) $ 501,76,.80
CRAJauJl OJtDBR SIJJIKARY ADD:I'l'XONS DZJJOCTZOWS
Tot&l change■ apprav9C! in
preriou• :IDOlltba :by OWner O.IJO
Total apprcwed t:l>i• month o.oo
'1'0'.l'ALS o.oo o.oo
m:'l' CBAlllGBS by Change Order o.oo
_ ARCBI'l'BC'l' _ COlll'l'RAC'l'OR
ComRACT DA'l'B:12/18/18
The undersigned contractor certifies that to the best of Contraclo(s knowledge. information
and belief the v.ork covered by this Application for Payment has been completed In accordance with the Contract Documents, that all amounts have been paid by Contractor for Work for which
previous Certificates for Payment W8fe Issued and Payments received from the Owner, and that current payment shown herein Is now due.
State of: Pem111YlT1UU•
Coanty of; Cheater
I 200 MALVJ!!RB, PA 19355
:ˋl9C
. rJ " oat•: 3-2\-lj
Commonwealth of PennsylVanla • Notary Seal
Brenda McCracken. Notary Public
Chester County My commission expires July 3, 2022
Sab■cribed. and SWorD to beforft r.9mmission n
Hotazy Public: Brendal Nc:Craeˌ
JC1I' C<md.ssion 11:xpir••• 07/03/22
ARCHITECT'S CERTIFICATE FOR PAYMENT
In accordance with the contract documents. based on-site observations and the data comprising the above Application. the Architect certifies to the Owner that to the best of the Architect's knowledge. infonnation and belief the Work has progressed as indicated. the quality of the Work is in accordance with the Contract Docunents. and that the Contractor is entitled to payment of the
AMOUNT CERTIFIED .......................................... $ 9 /, 6 B 3. z.o (Attach explanation if amount certified differs from the amount applied for initial all figures on this Application and on the Continuation Sheet that are change to conform to the amount certified.)
By: Data: 0"//CJ2../I f/
- 'l This Certificate is not negotiable. The AMOUNT CERTIFIED. Is payable only to the Contractor named hetein. Issuance, payment and acceptance of payment are without prejudlce to any rights of the Qv.ner, or Contractor under this Contract.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
AIA Type Document
Application and Certification for Payment
- TO: EAST GOSHEN TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
- PROJECT: EAST GOSHEN TWP WASH BAY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
- FROM (CONTRACTOR): F. W. HOUDER, INC., 183 LANCASTER AVENUE, SUITE 200, MALVERN, PA 19355
- APPLICATION NO: 1
- PERIOD TO: 03/21/19
- JOB NO: 000532
- INVOICE NO: 53201
- APP. DATE: 03/21/19
- CONTRACT DATE: 12/18/18
- VIA (ARCHITECT): blank; ARCHITECTS PROJECT NO: blank
- DISTRIBUTION TO: Owner, Architect, Contractor (unchecked boxes)
| Item | Description | Scheduled Value | Previous Applications | Completed This Period | Stored Material | Completed + Stored | % | Balance | Retainage |
|---|---|---|---|---|---|---|---|---|---|
| 000000 | MOBILIZATION | 15,000.00 | 0.00 | 15,000.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 1,500.00 |
| 000010 | GENERAL CONDITIONS | 50,000.00 | 0.00 | 10,000.00 | 0.00 | 10,000.00 | 20.00 | 40,000.00 | 1,000.00 |
| 000020 | EXCAVATION | 10,000.00 | 0.00 | 5,000.00 | 0.00 | 5,000.00 | 50.00 | 5,000.00 | 500.00 |
| 000030 | CONC FOUNDATION, REBARS | 44,000.00 | 0.00 | 40,000.00 | 0.00 | 40,000.00 | 90.91 | 4,000.00 | 4,000.00 |
| 000040 | MISC IRON | 6,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6,000.00 | 0.00 |
| 000050 | SLAB ON GRADE | 26,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 26,000.00 | 0.00 |
| 000060 | TRENCH DRAIN | 10,000.00 | 0.00 | 0.00 | 4,000.00 | 4,000.00 | 40.00 | 6,000.00 | 0.00 |
| 000070 | MASONRY | 76,000.00 | 0.00 | 6,000.00 | 0.00 | 6,000.00 | 7.89 | 70,000.00 | 600.00 |
| 000080 | TRUSSES,WOOD FRAMING | 32,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 32,000.00 | 0.00 |
| 000090 | ROOFING,SKYLITES | 34,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 34,000.00 | 0.00 |
| 000100 | FASCIA, SOFFIT,GUTTERS | 14,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 14,000.00 | 0.00 |
| 000110 | INSULATION,DRYWALL,FRP | 26,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 26,000.00 | 0.00 |
| 000120 | PAINTING | 5,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 5,000.00 | 0.00 |
| 000130 | DOORS & FRAMES | 26,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 26,000.00 | 0.00 |
| 000140 | PLUMBING | 30,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 30,000.00 | 0.00 |
| 000150 | MECHANICAL | 20,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 20,000.00 | 0.00 |
| 000160 | ELECTRICAL | 65,000.00 | 0.00 | 10,000.00 | 0.00 | 10,000.00 | 15.38 | 55,000.00 | 1,000.00 |
| 000170 | DEWATERING CONTROL | 10,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 10,000.00 | 0.00 |
| 000180 | SITE SANITARY | 4,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 4,000.00 | 0.00 |
| 000190 | SITE DEMO | 8,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 8,000.00 | 0.00 |
| 000200 | EARTHWORK | 6,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6,000.00 | 0.00 |
| 000210 | CURB & SIDEWALK | 8,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 8,000.00 | 0.00 |
| 000220 | STORM WATER | 6,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6,000.00 | 0.00 |
| 000230 | SAND/OIL SEPARATOR | 7,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 7,000.00 | 0.00 |
| 000240 | PAVING | 22,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 22,000.00 | 0.00 |
| 000250 | LANDSCAPING | 2,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2,000.00 | 0.00 |
| 000260 | BOND | 11,648.00 | 0.00 | 11,648.00 | 0.00 | 11,648.00 | 100.00 | 0.00 | 1,164.80 |
| 000270 | ALLOWANCE | 20,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 20,000.00 | 0.00 |
| REPORT TOTALS | 593,648.00 | 0.00 | 97,648.00 | 4,000.00 | 101,648.00 | 17.12 | 492,000.00 | 9,764.80 |
Page: 1
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
April 17, 2019
To: Board of Supervisors
From: Mark Miller
Re: Tractor/Mower Replacement
We are scheduled to replace our 1988 Case tractor and mower and budgeted $56,000 in this year's capital budget for this purpose. I have reached out to several COSTAR vendors to get pricing. The tractor and mower are fully depreciated {31 years) of service. We will advertise the tractor and mower on Muni-ci-bid which should sell for $8,500.00, meaning that the net cost of the replacement tractor will be under budget.
Below are the costs for the new tractor and mower:
AG Industrial - Tractor Powerstar 75 $45,150.00 1812 Brush Hog 12' Wing Mower $12,975.00 Total $58,125.00
Power Pro-Tractor $48,186.50 Mower $12,320.00 Total $60,506.50
Cherry Valley Tractor $46,258.00 Woods T144 Mower $13,841.00 Total $60,099.00
Madame Chair, I recommend we purchase the tractor and mower from A.G.lndustrial in the amount of $58,125.00 and sell the 1988 Case tractor and mower on Municibid.
F:\Data\Shared Data\Public Works Dept\Equipment Purchases 2019\Tractor mower purchase April 17.docx
April 3, 2019
Mr. Rick Smith
ROBIN STUNTEBECK, Chair HUGH J. PURNELL JR., Vice-Chair MARY R. LASOTA, Esq., Member EDWARD G. MEAKIM JR., Member CHRISTOPHER PIELLI, Esq., Member
CASEY LALONDE, Township Manager
East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Board of Supervisors
1025 Paoli Pike• West Chester, PA 19380-4699 610•696•5266 - Fax: 610•429•0616 twp@westgoshen.org www.westgoshen.org
APR B 2019
Re: West Goshen Township Comprehensive Plan Update
Dear Rick,
I hope to find you well. Please find enclosed our final draft of West Goshen Township's 2019 Comprehensive Plan update. The Comprehensive Plan Task Force has worked since October 2017 in updating this document. Please review the Plan and provide comment, per the Pennsylvania Municipalities Planning Code.
Thank you for your assistance with this project and please contact me with any questions.
asey LaLonde Township Manager
•' ....
·-----..-.. ---·-;, .. ..-..
Legend
Single F amlly Detached -Mobile Home Park 1111 Twin/Townhouse r-J ApartmenVCondominium -Commercial/Omce
lndustlialll.ight Industrial
Existing Land Use
West Goshen Township Comprehensive Plan
· ·••'--·
-Institutional
Airport -Utility - Public Park/Open Space Cl Pvate Open Space/Recreation
Vacant/Open/Wooded
. ....
,.o:xi e;a,sa .... 'aa·o:xi
F .. t Cata Source: Chester County GIS, 01/2018 Land use basd on Counly ta)(
assessment data and aerial
photo interpretation
Map prepared bye
/ l
_ ..
■Sarcinello
Planning & GIS Services
Date: March 22, 2019
Oisdaimer: This map Is intended lo be used for reference and illustrative purposes only. This map is not a survey, off,cial ta)( map or engineering schematic and it is nol intended to ba used as such. Sarcinello Planning & GIS Services makes no representalion as to the accuracy or lines, p,oints, or other features shown on this map, and assumes no liability for use of thi$ map.
State Roads
West Goshen Township Comprehensive Plan
:--.. -. ----· -----... --... -----. ----------.... ---------.............. ---....... . ' "'°''ll:\'.r!C!.!..,$,,,,.,. .. ,,, ---·-······--·-·--·····
#: ..
; . J: .. i \ t!
......................... -----, l----------... ---G:l;;;H;·;;,:..:. :,, I
'
t
w,,.r,:<:r,n,tMB<.,_.. 1o1• ------------------ ·---.._, ....... ...,. ______ ,.....,._ ........ .
!
------ ------------
Legend
State Roads
Local Road
1,000 1,000 ,.
Dala Source: Che•ter County GIS, 0112018
reen ·11 R
Westtown Rd
Map prepared by;
----------·····:··· ..
; t:
■Sarcinello
Planning & GIS Services
Date: Mardi 22, 2019
Disclaimer: This map is intended 10 be used for reference and illustrative purposes only. This map Is not a survey, official tax map or engineering schematic and it is not intended to be used as such. Sareinello Planning & GIS Sef"IAces makes no representallon as to the accuracy of fines, points, or other features shov.n on this map, and assumes no liability for use of this map.
Road Improvements Identified by Township
West Goshen Township Comprehensive Plan
j :: ,
! ³'-"'-•_r•_•_ct_lo_n __ ,,---' \
S New St/ Rosedala Ave Intersection
Roslyn I Pomona Cut•Thru, Congestion, Parking
/
Rt 202 I Matlack St Intersection, Conge$tlon
Legend
c:) Intersections/Exchanges/Corridors
State Roads
I I
. ..,.,.,..--........ _..,* -•""-- - +-,- ·
\".'U::l(.c1"'1!:1,...,,l--<tt
1,000
F!!:t
Oala Source:
1.000
Chester County GIS, 01/2018 West Goshen T'-'1) GIS 0212018
Map prepared by: ■ Sarcinello
Planning & GIS Services
Dale: March 22, 2019
Disclaimer: This map is intended to be usad for reference and illustrative purposes only. This map is nol a survey, official tax map or engineering schematic and it is not Intended to be used as such. Sarcitiello Planning & GIS Sel'Vices makes no representation as to the accuracy of lines, poW!ts, or olher features sho\Ml on th!$ map, and assumes no liability for use oflhis map.
Pedestrian Circulation Plan
West Goshen Township Comprehensive Plan
Existing Proposed•
-- Sidewalk Ě • · -· - Sidewalk
-Trail: Pedestrian Only u, Trail: Pedestrian Only
--Trail: Pedestrian & Bike ""'' Trail: Pedestrian & Bike
o Bus Stop Priority Project Area
Intersection Improvements e Add Crosswalks/Ped. Signals 0 Add Mid-Block Crossing G Update Crosswalks/Ped. Signals
"Proposed pedestrian improvemenls are based on the Central Cheste,County Bike
& Pedestrian Circulation Plan \'Ath modificalions in ttie Paoli Pike/West Ctiester Pike Priority Area and High Street, and addltlon of trails al Greystone.
Map prepared by:
·
\
I...
k., .... 1o_&. liRt .. nl'norltJ A,um■p
·,. 1.000 ,.. ■ Sarcinello Planning & GIS Services
Date: March 22, 2019
Disclaimer: This map is intended to be used for reference and illustralive purposes only. This map is not a survey, official tax map or engineering schematic and it is not intended to be used as such. Sarcinella Planning & GIS Services makes no representation BS to the accuracy of lines, poin1s, or other f.ea1ure$ sho1Ml on thts map, and tissumes no liability for use of this map.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Pedestrian Circulation Plan: Priority Area
West Goshen Township Comprehensive Plan
Aerial-photograph map of the West Goshen priority area outlined in yellow, with proposed sidewalks, existing sidewalks, existing SEPTA bus stops and proposed crosswalk and pedestrian signal improvement locations along the main roads.
Map labels
- To Henderson High School
- To Downtown West Chester
- To West Goshen Community Park & Paoli Pike Trail (two arrows)
- Henderson HS
- Turner Square
- West Goshen Shopping Center
- Park & Ride
- Paoli Pike Park
- Discovery School
- Goshen Manor Apts
- West Goshen Town Center
- Coopersmith Park
- Goshen Terrace Apts
- Golf Club Apts
- Rolling Green Memorial Park
- Wawa
- Two Ridge & Police
- 202 (route marker)
Legend
- Priority Area
- Existing Sidewalk
- Existing SEPTA Bus Stop
- Proposed Sidewalk
- Proposed Intersection Improvement: Update Crosswalks/Pedestrian Signals
- *Proposed pedestrian improvements are based on the Central Chester County Bike & Pedestrian Circulation Plan with some modifications.
Map prepared by: Sarcinello Planning & GIS Services. Date: March 22, 2019.
Data Sources: Existing Features - Chester Co. Sidewalk and Trail Inventories; SEPTA; Proposed Features - Central Chester Co Bike and Pedestrian Circulation Plan with modifications; Base Map - Chester Co. GIS. Scale bar from 0 to 280 feet.
Disclaimer: This map is intended to be used for reference and illustrative purposes only. This map is not a survey, official tax map or engineering schematic and it is not intended to be used as such. Sarcinello Planning & GIS Services makes no representation as to the accuracy of lines, points, or other features shown on this map, and assumes no liability for use of this map.
...,.,,
Legend
[:)Higher Density Mixed-Use /
..._, Redevelopment Area CJ Paoli Pike Corridor Mixed-Use/
Redevelopment Area D Residential Infill Development
- Commercial, Office, High-Density
Residential
Future Development Plan
West Goshen Township Comprehensive Plan
..... _
♦---·
- Commercial, Office, Industrial Infill 1!11 Neighborhood Commercial
- Existing Public Par1</Open Space
- Existing Private Open Spaoe/Reereation
- Existing Institutional Use
1.000 1.000 ,...
•. o' /
Dilltii Source: Base Map Features Cher County GlS, 0112018
Map prepared by: ■ Sarcinello Planning & GIS Services
Dale: March 19, 2019
Disdaimer: This map is intended to be used for reference and illustrative purposes only. This map is not a survey, offtcial tax map or engineering schematic and It is not Intended to be used as sueh. SafCinello Planning & GIS Services makes no representation as to the accuracy of lines, points. or other features shown on this map, and assumes no liability for use of this map.
,..,,.·'
.,,. .. _,,,_ -.... --.. -·- ......
Legend
o Creek/Stream
... Pond/Lake
p Welland
Bwoodland q Critical Habitat
Natural Resources
West Goshen Township Comprehensive Plan
Habitat - Supporting Area
- 100-Year Floodplain
-HydJicSoil
- Precautionary 5teep 5Iope (1 :i¾-20%)
- Prohibitive Steep Slope (>20%)
1,000 1.000 15;i,,,²,"' .. ", iiiiiiiiiiii
Data Source: Chester County GIS, 0112018
Map prepared by:
/r/¥ / .t
. _ .. --__ __. .. ._ ■ Sarcinello Planning & GIS Services
Date: March 22, 2019
Disclaimer. This map is inlended lo be used for rererencs and illustrative purposes only. This map is not a suNey, otftcial tax map or engine-erlng schematic and it is not Intended to be used as such. SarcineUo Planning & GI$ Services. makes no tapresentation as to the accuracy of lines, points, or other features sho>wn on lhls map, and assumes no tlability for use of this map.
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610·692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/17/2018 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer Cc: Mark Miller, Public Works Director Re: Penn DOT Agreement for Incorporated Work
Dear Board Members:
As you know, the Paoli Pike Trail Project is completing the permitting process with Penn DOT and we have a number of final housekeeping items to clean up for the project.
Along Segments F and G (Applebrook Park) of the trail, there are two (2) EGT sanitary sewer manholes that need to be adjusted to meet the new final grades.
PennDOT requires that the Township and the Municipal Authority enter into an agreement to ensure that the Township is going to pay for and/ or reimburse the East Goshen Municipal Authority for the cost of the required adjustment. This is another safeguard PennDOT has in place to ensure all public utilities are protected and reimbursed for the relocation of utility infrastructure.
Mark Miller is well aware of this project requirement and the PW Dept. will perform the work to make the elevation adjustment to these manholes.
Staff Recommendation:
Staff recommends that the Board authorize the Chairman to execute this Project Agreement for Incorporated Work and forward it to the Municipal Authority for their authorization.
Draft Motion:
I move that the Board authorize the Chairman to execute the Project Agreement for Incorporated Work with the East Goshen Municipal Authority for the work needed to adjust the two (2) manholes within the Paoli Pike Trail project area within Segments F and G of the Paoli Pike Trail Project.
F:\Data\Shared Data\Paoli Pike Trail\Memo to BOS re. EGT BOS and MA Agreement 04182019.doc
Agreement No. 00001
PROJECT AGREEMENT FOR INCORPORATED WORK
This Project Agreement, numbered 00001 is made and entered into this ....,....,..--,,---,--n-day of -o-,,...-pq___,,=---,----==-' between "East Goshen Township", hereinafter "Township" and "East Goshen Township Municipal Authority", hereinafter "Utility".
WITNESS ETH
Whereas, the Township is about to undertake a project on Paoli Pike (SR 2014) in Chester County. hereinafter "Project" which requires the adjustment of "Utility" castings; and,
Whereas, "Utility" has requested and "Township" has agreed to incorporate the adjustment of said castings into the Project agreement; and,
Whereas, "Utility" agrees to reimburse "Township" the cost of the adjustment of the castings in accordance with this Agreement.
NOWTHEREFORE
In consideration of the foregoing premises and the mutual promises hereinafter set forth, and with intent to be legally bound hereby, the Parties agree as follows:
1. The estimated number of castings to be adjusted and the cost of each are shown on Exhibit 1 which is attached hereto and made a part hereof. Casting adjustment costs are estimated to be a total cost of$ $1,970.00 . 2. In the event the actual number of castings to be adjusted changes from the number estimated in Exhibit 1, "Utility" agrees to reimburse "Township" for the actual number
of adjusted castings based on the unit costs shown on Exhibit 1. 3. Upon completion of the work to the satisfaction of"Utility", "Township" shall invoice "Utility" for the adjustment of the castings. "Utility" agrees to pay "Township" within 60 days of receipt of an invoice from "Township". 4. All work performed pursuant to this Agreement must comply with the Buy America provisions in 23 U .S.C. §313 and 23 CFR §635.410 and the Steel Products Procurement Act, 73 P.S. §1881 et seq.
1
IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed, en sealed and attested by their proper officials, pursuant to due and legal action authorizing the same to be done, the day and year first above written.
ATTEST:
East Goshen Township Municipal Authority East Goshen Township
by ____________ _ Signature Date
by ____________ _ Signature Date
Title Title
2
RE:
County: Chester
Utility: East Goshen Township Municipal Authority
Hereinafter set forth is the listing of anticipated castings which are being incorporated herein by this Agreement.
Number of Unit Total Castings Bid Item Price Cost
9999-9950 388.00
9999-9951 365.00
9999-9952 473.00
9999-9953 477.00
9999-9954 591.00
9999-9955 567.00
9999-9956 690.00
9999-9957 713.00
9999-9958 908.00
2 9999-9959 735.00 1470.00
9999-9960 951.00
9999-9961 1 183.00
9999-9962 558.00
2 9999-9963 250.00 500.00
9999-9964 404.00
9999-9965 279.00
9999-9966 465.00
9999-9967 495.00 EXHIBIT 1
3
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/17/2018 To: From: Re:
Board of Supervisors , JJ( Mark Gordon, Township Zoning Officer ,t-1 \o Penn DOT Applications for Traffic Signal Approvals
Dear Board Members:
As you know the Paoli Pike Trail Project is completing the permitting process with Penn DOT and one of the final housekeeping items is to submit traffic signal permit applications for the minor signal changes proposed for the following signals along segments C, D, and E, of the Paoli Pike Trail:
l. Reservoir Rd. and Paoli Pike: Pedestrian push buttons, curb ramps and crosswalks (ADA Compliant). 2. Boot Rd. and Paoli Pike: Pedestrian push buttons, curb ramps and crosswalks. (ADA Compliant). 3. Goshen Village Shopping Center and Paoli Pike: Pedestrian push buttons, curb ramps and crosswalks. (ADA Compliant). 4. N. Chester Rd. and Paoli Pike: Pedestrian push buttons, curb ramps and crosswalks. (ADA Compliant).
Staff Recommendation:
Staff recommends that the Board authorize the Chairman to execute these PennDOT Traffic Signal applications for the Paoli Pike Trail Project.
Draft Motion:
I move that the Board authorize the Chairman to execute the PennDOT Signal Permit Applications for the modifications required at the following four traffic signals along Paoli Pike within Segments C, D, and E of the Paoli Pike Trail Project:
1. Reservoir Rd. and Paoli Pike 2. Boot Rd. and Paoli Pike 3. Goshen Village Shopping Center and Paoli Pike 4. N. Chester Rd. and Paoli Pike
F:\Data\Shared Data\Paoli Pike Trail\Memo to BOS re. Traffic Signal apps for PPT 04172019.doc
TE-160 (6-12)
Application for Traffic Signal Approval
Please Type or Print all information in Blue or Black Ink
A - Applicant's (Municipal} Contact Information
penlisylvania
DEPAAlMENT Of lRANSPORlATJON
County:
Sheet 1 of 5 DEPARTMENT USE ONLY
Engineering District :
Department Tracking#:
Initial Submission Date :
Municipal Contact's Name : Louis Smith ------------------- Title :Township Manager
Mun ic i pa I Name: East Goshen Township
Municipal Address : 1580 Paoli Pike, West Chester, PA 19380-6199
Municipal Phone Number: 610-692-7171 Alternative Phone Number: -------------- -------------- E -ma ii Address : rsmith@eastgoshen.org
Municipal Hours of Operation : Monday- Friday from 8:00 AM to 5:00 PM
B - Application Description
Location (intersection) : Paoli Pike (SR 2014) and Reservoir Road
Traffic Control Device is : 0 NEW Traffic Signal IRI EXISTING Traffic Signal (Permit Number) : 62-2394
Traffic Control Signal Flashing Beacon School Warning System Type of Device (select one) [8j (MUTCD Section 4D, 4E, 4G) □ (MUTCD Section 4l) D (MUTCD Section 78) D Other:
Is Traffic Signal part of a system?: IRl YES 0 NO System Number (if applicable): 1-0164 If YES, provide locations of all signalized intersections in system.
Paoli Pike (SR 2014) & Airport Road/School Driveway; Paoli Pike (SR 2014) & Ellis Lane; Paoli Pike (SR 2014) & Reservoir Road; Paoli Pike (SR 2014) & Boot Road (SR 2020); Paoli Pike (SR 2014) & Goshen Village Shopping Center; Paoli Pike (SR 2014) & North Chester Road (SR 0352); Paoli Pike (SR 2014) & Hibberd Lane/Township Park Road
Explain the proposed improvements: Installation of multi-use trail and ADA curb ramps on the northeast corner (Reservoir Road north-south). Installation of Accessible Pedestrian Signals for all crossings and continental crosswalks for crossing the north leg and east leg.
Associated with Highway Occupancy Permit (HOP)?: D
C - Maintenance and Operation Information
Maintenance and Operations are typically performed by? :
[J Municipal Personnel fxl Municipal Contractor O Other:
YES NO If YES, HOP Application# :
n Municipal Personnel & Contractor ---------------------------------------
Maintenance and Operations Contact Name : _S _te_p_h_a_n_ie_ M_c_c_o_ug_h _____ Company/Organization : Charles A Higgins & Sons, 'ii
Phone# : 610-566-3700
D - Attachments Listing
IE] Municipal Resolution (required) O Letter of Financial Commitment O Traffic Signal Permit fJ Warrant Analysis O Crash Analysis D Traffic Signal Study
Alternative Phone # :
0 Location Map □Photographs □Straight Line Diagram □ Capacity Analysis □Traffic Impact Study (TIS) 0 Condition Diagram
E-mail: higginse1ec25@verizon.net
O Traffic Volumes / Pedestrian Volumes 0 Turn Lane Analysis D Turn Restriction Studies 0 Other:
TE-160 (6-12)
Application for Traffic Signal Approval
Please Type or Print all information In Blue or Black Ink
A - Applicant's (Municipal) Contact Information
Municipal Contact's Name : Louis Smith
Sheet 1 of S DEPARTMENT USE ONLY County: ------------- Engineering District:
Department Tracking ff ---------
1 nit i a I Submission Date:
Title :Township Manager ------------------ Muni ci pa I Name :East Goshen Township
Municipal Address : 1580 Paoli Pike, West Chester, PA 19380-6199
Municipal Phone Number: 610-692-7171 Alternative Phone Number: -------------- ------------- E-mail Address :rsmith@eastgoshen.org
Municipal Hours of Operation : Monday- Friday from 8:00 AM to 5:00 PM
B - Application Description
Location (intersection) : Paoli Pike (SR 2014) and Boot Road (SR 2020)
Traffic Control Device is : D NEW Traffic Signal IRl EXISTING Traffic Signal (Permit Number): 62-1819
Type of Device (select one) fxi Traffic Control Signal D Flashing Beacon □
School Warning System (MUTCD Section 40, 4E, 4G) {MUTCD Section 4L) (MUTCD Section 7B) D Other:
Is Traffic Signal part of a system? : 18] YES D NO System Number (if applicable) : 1-0164 If YES, provide locations of all signalized intersections in system.
Paoli Pike (SR 2014) & Airport Road/School Driveway; Paoli Pike (SR 2014) & Ellis Lane; Paoli Pike (SR 2014) & Reservoir Road; Paoli Pike (SR 2014) & Boot Road (SR 2020); Paoli Pike {SR 2014) & Goshen Village Shopping Center; Paoli Pike (SR 2014) & North Chester Road (SR 0352); Paoli Pike (SR 2014) & Hibberd Lane/Township Park Road
Explain the proposed improvements : Installation of multi-use trail and ADA curb ramps on the northeast corner, northeast corner island, northwest corner and southwest corner (Paoli Pike north-south). Installation of Accessible Pedestrian Signals and continental crosswalks for all crossings.
Associated with Highway Occupancy Permit (HOP)?: D YES 18} NO If YES, HOP Application#:
C - Maintenance and Operation Information
Maintenance and Operations are typically performed by? :
fJ Municipal Personnel 18] Municipal Contractor ["] Municipal Personnel & Contractor O Other: -------------------------------:-------
Maintenance and Operations Contact Name : Stephanie McCough
Phone# : 610-566-3700
D - Attachments Listing
Ix] Municipal Resolution (required) D 0 D □ □
Letter of Financial Commitment
Traffic Signal Permit
Warrant Analysis
Crash Analysis
Traffic Signal Study
Alternative Phone # :
D Location Map □ Photographs 0 Straight Line Diagram □ Capacity Analysis 0 Traffic Impact Study (TIS) □Condition Diagram
Company/Organization: Charles A Higgins & Sons, liij
E-mail : higginselec25@verizon.net
D Traffic Volumes / Pedestrian Volumes O Turn Lane Analysis O Turn Restriction Studies D Other:
TE-160 (6-12)
Application for Traffic Signal Approval • peniisylvania
DEPARTMENT OF TRANSPORTATION
Please Type or Print all information in Blue or Black Ink
A - Applicant's {Municipal) Contact Information
County:
Sheet 1 of 5 DEPARTMENT USE ONLY -------------
Engineering District: ----------
Depa rt men t Tracking II : ---------
1 nit i a I Submission Date:
Municipal Contact's Name : Louis Smith Title :Township Manager ------------------ Muni ci pa I Name :East Goshen Township
Municipal Address : 1580 Paoli Pike, West Chester, PA 19380-6199
Municipal Phone Number: 610-692-7171 Alternative Phone Number: -------------- ------------- E-mail Address: rsmith@eastgoshen.org
Municipal Hours of Operation : Monday- Friday from 8:00 AM to 5:00 PM
B - Application Description
Location (intersection) : Paoli Pike (SR 2014) and Goshen Village Shopping Center Drive
Traffic Control Device is : □ NEW Traffic Signal É EXISTING Traffic Signal {Permit Number) : 62-2500
Traffic Control Signal Flashing Beacon School Warning System Type of Device (select one) Ê (MUTCD Section 40, 4E, 4G) □ (MUTCD Section 4L) □ (MUTCD Section 78) □ Other:
Is Traffic Signal part of a system? : lg) YES 0 NO System Number (if applicable) : 1-0164 If YES, provide locations of all signalized intersections in system.
Paoli Pike (SR 2014) & Airport Road/School Driveway; Paoli Pike (SR 2014) & Ellis Lane; Paoli Pike (SR 2014) & Reservoir Road; Paoli Pike (SR 2014) & Boot Road (SR 2020); Paoli Pike (SR 2014) & Goshen Village Shopping Center; Paoli Pike (SR 2014) & North Chester Road (SR 0352}; Paoli Pike (SR 2014} & Hibberd Lane/Township Park Road
Explain the proposed improvements : Installation of multi-use trail and ADA curb ramps on the northeast and southeast corners (Paoli Pike north-south}. Installation of Accessible Pedestrian Signals and continental crosswalks for all crossings.
Associated with Highway Occupancy Permit {HOP)?: □ YES Ix) NO If YES, HOP Application#:
C - Maintenance and Operation Information
Maintenance and Operations are typically performed by?
[] Municipal Personnel 18] Municipal Contractor O Municipal Personnel & Contractor D Other: -------------------------------------
Maintenance and Operations Contact Name :_St_e_
p
_h_a
_ ni_
e
_
M
_
c
_ c_o
_
u
_ g
_ h ____ Company/Organization: Charles A Higgins & Sons, l'ti
Phone#: 610-566-3700
D - Attachments Listing
[8:! Municipal Resolution (required) D Letter of Financial Commitment 0 Traffic Signal Permit rJ Warrant Analysis D Crash Analysis CJ Traffic Signal Study
Alternative Phone # :
D Location Map D Photographs O Straight Line Diagram D Capacity Analysis O Traffic Impact Study (TIS) 0 Condition Diagram
E-mail: hlgginse1ec25@verizon.net
D Traffic Volumes / Pedestrian Volumes D Turn Lane Analysis D Turn Restriction Studies D Other:
TE-160 (6-12)
Application for Traffic Signal Approval peilnsylvania
DfPAATMENT OF TRANSPORTATION
Please Type or Print all information in Blue or Black Ink
A - Applicant's (Municipal) Contact Information
Sheet 1 of 5 DEPARTMENT USE ONLY County: -------------
Engineering District:
Department Tracking# : ---------
1 nit i a I Submission Date:
Municipal Contact's Name: Louis Smith Title :Township Manager ------------------ Muni ci pa I Name :East Goshen Township
Municipal Address: 1580 Paoli Pike, West Chester, PA 19380-6199
Municipal Phone Number: 610-692-7171 Alternative Phone Number: -------------- ------------- E-mail Address: rsmith@eastgoshen.org
Municipal Hours of Operation : Monday- Friday from 8:00 AM to 5:00 PM
B - Application Description
Location (intersection): Paoli Pike (SR 2014) and North Chester Road (SR 0352)
Traffic Control Device is : □ NEW Traffic Signal lEj EXISTING Traffic Signal (Permit Number): 62-1740
Type of Device (select one) IKJ Traffic Control Signal D Flashing Beacon D School Warning System {MUTCD Section 4D, 4£, 46) {MUTCD Section 4L) {MUTCD Section 7B) 0 Other:
Is Traffic Signal part of a system? : IRi YES 0 NO System Number (if applicable) : 1-0164 If YES, provide locations of all signalized intersections in system.
Paoli Pike (SR 2014) & Airport Road/School Driveway; Paoli Pike (SR 2014) & Ellis Lane; Paoli Pike (SR 2014) & Reservoir Road; Paoli Pike (SR 2014) & Boot Road (SR 2020); Paoli Pike (SR 2014) & Goshen Village Shopping Center; Paoli Pike (SR 2014) & North Chester Road (SR 0352); Paoli Pike (SR 2014) & Hibberd Lane/Township Park Road
Explain the proposed improvements : Installation of multi-use trail and ADA curb ramps on the southwest corner (Chester Road north-south). Installation of Accessible Pedestrian Signals for all crossings. Installation of continental crosswalk on the west leg of Paoli Pike.
Associated with Highway Occupancy Permit {HOP)?: D YES JR: NO If YES, HOP Application#:
C - Maintenance and Operation Information
Maintenance and Operations are typically performed by? :
t.i Municipal Personnel JR! Municipal Contractor rJ Municipal Personnel & Contractor D Other : -------------------------------------
Maintenance and Operations Contact Name : Stephanie McCough
Phone# : 610-566-3700 Alternative Phone #
D - Attachments Listing
lxl Municipal Resolution (required) □ Location Map □ Letter of Financial Commitment □Photographs □Traffic Signal Permit □Straight Line Diagram n Warrant Analysis r:::i Capacity Analysis D Crash Analysis 0 Traffic Impact Study (TIS) □Traffic Signal Study D Condition Diagram
Company/Organization : Charles A Higgins & Sons, hcj
E-mail: higginse1ec25@verizon.net
□Traffic Volumes / Pedestrian Volumes □Turn Lane Analysis
[] Turn Restriction Studies □Other:
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 61°"692-7171 Fax: 610-692-89SO E-mail: mgordon@eastgoshen.org
Date: 4/19/2019 To: Board of Supervisors J / From: Mark Gordon, Township Zoning Officer l, Re: Paoli Pike/ Goshenville TND Overlay District
Board Members,
In April of 2018 the Planning Commission was tasked with developing a zoning ordinance amendment that reflected the planning objectives outlined in the 2015 Comprehensive Plan and the Paoli Pike Corridor Master plan. A draft ordinance has been developed for the Boards consideration. I have already distributed the final draft ordinance and development standards for your review. The draft is now on the website.
The Planning Commission worked hard on this for a full year, with the primary concern being whether or not to create an overlay district or create an outright change to the zoning. The PC ultimately decided to draft and recommend a Traditional Neighborhood Development Overlay District within Goshenville.
Mr. Comitta is prepared to make a presentation to the Board at your first availability. We suggest that this topic be the only item on the agenda for that evening. After the presentation and once the Board has had time to review and discuss the ordinance amendments with Mr. Comitta and staff, the PC believes that it's important
to have a public engagement session to engage the public.
Please advise staff on what dates work for the Board in June to conduct the presentation.
F:\Oata\Shared Oata\Admin Dept\ Township Code\Paoli Pike Overlay TNO Ord\Memo to BOS Re. TNO Ord. 04182019.doc
AREA CODE $10
592•7171
April 18, 2019
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1 !180 PAOLI PIKE, WEST CHESTER, PA 19380·8199
Re: Paoli Pike/ Goshenville Traditional Neighborhood Development Overlay (TND)
Dear Board Members:
At their meeting on April 3, 2019 the Planning Commission voted in favor of the following motion:
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors consider the Traditional Neighborhood Overlay District ordinance amendments and design guidelines and seek public input on the proposed amendments.
Sincerely, •
/} f /(CJ Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Admin Dept\Township Code\Paoli Pike Overlay TND Ord\PC Rec to BOS 04112019.doc
MEMO
To: Board of Supervisors
From: Joanne Morgan
Re: Right-to-Know Quarterly Report
January-February-March 2019
Tim Browne IBEW 98
3900 Ridge Pike Collegeville, PA 19426
Mr. Browne submitted Standard Right-to-Know Request Forms for electrical bid results for the following
items: Township Building Vestibule Modifications East Goshen Municipal Complex Wash Bad Addition 2018 Storm Sewer Lining East Goshen Municipal Complex Wash Bay Addition Tallmadge Drive Sewer Replacement
Electrical Bid result information was forwarded to Mr. Browne for the Municipal Projects he requested.
John Caulfield 1533 Meadowbrook lane West Chester, PA 19380
Mr. Caulfield submitted a Standard Right-to-Know Request Form requesting a copy of the building permit information for garage and porch enclosure for the permit dated 12/29/199. The information was e-mailed to Mr. Caulfield.
Delores Beridge 1423 Linden lane West Chester, PA 19380
Ms. Berridge submitted a Standard Right-to-Know Request Form requesting a hard copy of the plot plan for her residence which is 1423 Linden lane. A hard copy was mailed to Mrs. Berridge.
F:\Data\Shared Data\Admin Dept\RFl\2019\Q Report Jan Feb March 2019.docx
Lisa Dyer 555 Lancaster Avenue Berwyn, PA 19312
Ms. Dyer submitted a Standard Right-to-Know Request Form requesting a monthly summary of residential building permits for all new construction of houses, renovations and additions issued in
December 2018. An e-mail was sent to Ms. Dyer letting her know where on the East Goshen Township website she could obtain the information she requested.
Tony Kyne
1623 Williams Way West Chester, PA 19380
Mr. Tony Kyne submitted a Standard Right-to-Know Request Form requesting a plot plan for his property located 1623 Williams Way. The plot plan information was e-mailed to Mr. Kyne.
Matthew Leone 822 Cottonwood Drive Malvern, PA 19355
Mr. Leone submitted a Standard Right-to- Know Request asking for a site plan and setbacks for his property located 822 Cottonwood Drive. An e-mail was sent to Mr. Leone with the information he requested.
Mr. Joseph Rubbo 301 Swedesford Road Malvern PA 19355
Mr. Rubbo submitted a Right-to- Know asking for plans on 1308 South Tulip Drive. Mr. Rubbo was e mailed stating that the plans were at the Township Building for review. Due to the copyright law the plans could not be copied. Mr. Rubbo sent an e-mail stating that the plans did not match. Mr. Rubbo was given the link to the Office of Open Records if he would like to appeal the letter.
F:\Data\Shared Data\Admin Dept\RFl\2019\Q Report Jan Feb March 2019.docx
Ms. Sandra Makos 1408 Morstein Road West Chester, PA 19380
Ms. Makos submitted a Standard Right-to-Know Request Form requesting access to records East Goshen Township has kept in connection with resident feedback of proposed zoning amendments. The
residents would like to know how many e-mails, letters, petition signatures the township has received for and against the proposed zoning changes. Mr. Smith, the Right to Know Officer, mailed a CD with the various e-mails and where they were sent or received along with copies of two letters and a paper copy of the petition. She was told that she could review the CD using Microsoft Outlook.
Peter Hoover 200 Century Parkway Suite C
Mt. Laurel, NJ 08054
Mr. Hoover submitted a Standard Right-to Know Request Form for Synthes Development Center, 1230 Wilson, Drive, West Chester, PA. This would include environmental records and contamination issues pertaining to soil and ground water. An e-mail was sent to Mr. Hoover informing him the property is located in West Goshen Township.
Lisa Dyer 555 Lancaster Avenue Berwyn, PA 19312
Ms. Dyer submitted a Standard Right-to-Know Request Form requesting a monthly residential building permit summary for all residential new construction of houses, renovations or additions issued in January 2019. An e-mail was sent to Ms. Dyer informing her where she could obtain the monthly
building permit information.
Mr. Kenneth Deloian SmartProcure
700 W. Hillsboro Blvd., Suite 4-100 Deerfield Beach, FL 33313
Mr. Deloian submitted a Standard Right-to-Know Request Form requesting any and all electronically maintained purchasing records dated 2018-12-05 to current. The information should include PO#, check or invoice #. This should date, description, price, Quantity, Vendor ID, name and address. A copy of this information was sent to Mr. Deloian.
F:\Data\Shared Data\Admln Dept\RFl\2019\Q Report Jan Feb March 2019.docx
Michael Allen 890 Jefferson Way West Chester, PA 19380
Mr. Allen submitted a Standard Right-to-Know Request Form asking for a copy of a building permit for 890 Jefferson Way. He would like to look at the originally approved building footprints. He would also like to look at subsequent building permits issued for the units 888, 889, 890 and 891 Jefferson Way. The information he requested were put in the file room for him to look at.
Mr. Andrew Aitkenhead Zero Waste USA 12316 World Drive, Suite 102 San Diego, CA 92128
Mr. Aitkenhead submitted a Standard-Right-to-Know Form requesting copies of all invoices issued for dog waste bags for the past two years. The information was e-mailed to Mr. Aitken head.
Aftan Bender 1229 High Gate Road West Chester, PA 19380
Ms. Bender submitted a Standard Right-to-Know Request for construction drawings that were submitted in 2016 for an addition. An e-mail was sent to Ms. Bender stating that she could look at the plans at the Township Building, pursuant to the Federal Copyright Act, they may not be photocopied or photographed. She would have to get permission from the architect Mr. Anthony Webb. Ms. Bender received permission from Mr. Webb and she stopped at the Township Building to pick up a copy of the plans.
Lisa Dyer 555 Lancaster Avenue Berwyn, PA 19312
Ms. Dyers submitted a Standard Right-to-Know Request Form asking for a summary of residential building permits for all new construction of houses, renovations or additions issued for February. An e mail was sent to Ms. Dyer letting her know where to find the information on the Township website.
