Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA Page -1- February 18, 2020

AGENDA EAST GOSHEN TOWNSHIP

BOARD OF SUPERVISORS

Tuesday, February 18, 2020

7:00 PM

1. Call to Order (7:00 PM) 2. Pledge of Allegiance 3. Moment of Silence 4. Announce that the meeting is being livestreamed 5. Chairman’s Report (7:05 PM to 7:10 PM) a. The Board met in Executive Session prior to tonight’s meeting for a personnel matter. b. The Boot Road Geophysical Survey (dated 1/2/2020) is available for review on the Township website. c. The Zoning Hearing Board hearing for the Malvern Institute has been scheduled for April 23, 2020 at 7:00PM. 6. Public Comment on non-agenda items – 30 minutes - (7:10 PM to 7:40 PM) 7. Emergency Services Reports a. WEGO – Chief Brenda Bernot b. Goshen Fire Co – January 2020 c. Malvern Fire Co – January 2020 d. Good Fellowship – Year End 2019 e. Fire Marshal – Carmen Battavio 8. Financial Report – January 2020 9. Approval of Minutes and Treasurer’s Report (7:40 PM to 7:45 PM) a. Minutes – January 28, 2020

February 4, 2020 b. Treasurers Report – February 13, 2020 10. Public Hearings - None 11. Old Business - None 12. New Business a. Consider recommendation for Community Day 2020 (7:45 to 7:50) b. Consider request to support redistricting legislation. (7:50 PM to 8:00 PM) c. Consider Construction Ordinance (8:00 PM to 8:10 PM). d. Review ABC Goals for 2020 and relationship with the Comp Plan. (8:10 PM to 8:20 PM) e. Consider applying for grant for gas leak detectors. (8:20 PM to 8:25 PM) f. Consider recommendation for Tri-Axle Dump Truck Rental. (8:25 PM to 8:30 PM) 13. Any Other Matter 14. Public Comment 15. Liaison Reports – none 16. Correspondence, Reports of Interest (8:30 PM to 8:35 PM) a. Green Region Letter of January 28, 2020, regarding grant application. b. PHMSA February 6, 2020, Notice of Proposed Rule Making, comments due April 6, 2020. 17. Adjournment (8:35 PM)

AGENDA Page -2- February 18, 2020

Meetings & Dates of Importance

Feb 24, 2020 Sustainability Advisory Committee 07:00pm Feb 27, 2020 Pipeline Task Force 05:00pm Mar 03, 2020 Paoli Pike Groundbreaking Segment C-E 05:00pm Reservoir Road and Paoli Pike Mar 03, 2020 Board of Supervisors 07:00pm Mar 04, 2020 Planning Commission 07:00pm Mar 05, 2020 Park & Rec Commission 07:00pm Mar 09, 2020 Municipal Authority 07:00pm Mar 11, 2020 Conservancy Board 07:00pm Mar 12, 2020 Historical Commission 07:00pm Mar 17, 2020 Board of Supervisors 07:00pm Mar 19, 2020 Futurist Committee 07:00pm Mar 23, 2020 Sustainability Committee 07:00pm Mar 24,2 020 Sustainability Workshop Event 06:00pm Mar 25, 2020 Pipeline Task Force 05:00pm

Newsletter Deadline for Summer 2020: May 1, 2020

The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant.

Public Comment – Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting. The Board of Supervisors will allocate a maximum of 30 minutes for public comment at the beginning of each meeting. If necessary, there will be a second period for public comment prior to the end of the meeting.

Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the “E-notification & Emergency Alert” button on the left side of the homepage.

ReadyChesco - Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!

Smart 911 – Smart 911 is a new service in Chester County that allows you to create a Safety Profile at www.smart911.com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency

AGENDA Page -3- February 18, 2020

information. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members’ allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search start faster.

F:\Data\Shared Data\Agendas\Board of Supervisors\2019\2019-12-17_Board of Supervisors Agenda with time.doc

RETTEW

···::a ... . . . ... ENVIROSCAN 3020 Columbia Avenue, Lancaster, PA 17603 • Phone: (800) 738-8395 E-mail: rettew@rettew.com • Website: rettew.com

October 22, 2019 Revised January 3, 2020

Mr. Larry J. Gremminger Sunoco Pipeline, LP 535 Fritztown Road Sinking Spring, PA 19608

RE: Geophysical Survey

Dear Mr. Gremminger:

Sunoco Pipeline, LP Pipeline Project S3-0460 Greenhill Road GPR Survey at Wilson Drive East Goshen Township, Chester County, PA RETTEW Project No. 096303003

Engineers

Environmental

Consultants

Surveyors

Landscape

Architects

Safety Consultants

Geophysicists

RETTEW Associates, Inc. completed a Ground Penetrating Radar (GPR) geophysical survey along a 980-foot section of the S3-0460, Greenhill Road horizontal directional drill (HDD) site. The purpose of the survey was to detect and delineate subsurface voids or low-density zones adjacent to an HDD path where inadvertent returns (I Rs) emerged near the intersection of Wilson Drive with East Boot Road and through a saw-cut in the roadway near the intersection of Greenhill Road with Carriage Drive on May 29, 2019. A multi-technique geophysical survey along a 250-foot section of the Greenhill Road HDD was completed on June 22, 2019. A copy of the report of the June 22nd survey is included as Attachment 1. The work reported here is an expansion of the previous survey to cover an earlier IR location, and to repeat the GPR survey with integrated Global Positioning System (GPS) location control. The following report, figures, and attachments describe the method and results of the investigation.

EXECUTIVE SUMMARY

The expanded survey was completed on October 8 and 9, 2019. GPR scanning detected several underground utilities (previously marked by others on the road surface) as well as four anomalous areas of high-amplitude GPR reflectors characteristic of disturbed or settled soils, possibly from movement or compaction of backfill material in the shallow utility trenches. Three anomalous areas encompass multiple water lines and valves, while the other (larger) area is devoid of any known utilities. The four areas displayed anomalous GPR reflection patterns but did not display the very high-amplitude "ringing" typically associated with open voids.

SITE DESCRIPTION

The S3-0460, Greenhill Road HDD is located at the intersection of East Boot Road and both Wilson Drive and Carriage Drive in Chester County, Pennsylvania (see Figure 1). A geophysical survey was conducted along a 980-foot section of the east- and west-bound lanes of Boot Road, which parallels the HDD alignment (see Figure 2). Portions of all lanes of Boot Road were sequentially closed (for approximately 4 to 6 hours each) to complete the survey.

0

Page 2 of 3 Sunoco Logistics, L.P. October 22, 2019 Revised January 3, 2020 RETTEW Project No. 096303003

GPRSURVEY

The GPR survey was completed using a GSSI GPR digital controller and dual-frequency 300/800 Mega Hertz

(MHz) scanning antenna. GPR systems produce cross-sectional images of subsurface features and layers by continuously emitting pulses of radar-frequency energy from a scanning antenna as it is towed along a survey profile. The radar pulses are reflected by interfaces between materials with differing dielectric properties. The reflections return to the antenna are displayed on a video monitor as a continuous cross section in real time. Since the electrical properties of air and clay mud are distinctly different from undisturbed soils, such features produce characteristic reflections. In particular, air and mud typically produce very high-amplitude reflections, with air-filled voids also often displaying reverbP.rating or

"ringing" reflections.

GPR scanning was performed along survey profiles spaced approximately 2 feet apart, as well as several additional diagonal transects (see Figure 2, red lines). The GPR data were integrated in real time with a Topcon Hiper Lite Plus DGPS GNSS system. The profiles were recorded for post-processing with both Radan by GSSI and GPR-Slice by Geophysical Archaeometry Laboratory, Inc. GPR-Slice was used to filter the individual profiles before combining them into a three-dimensional model of the subsurface. Seven horizontal slices were then extracted between O and 6 feet below grade. Figure 3 shows three of the seven horizontal slices and a composite of the seven slices combined. The shades of red represent the relative amplitude of the GPR signal increasing from white (minimum) to red (maximum).

Figure 4 summarizes the results of the GPR survey with an annotated slice and two vertical GPR cross-sectional profiles showing samples of the anomalous features identified in the 3D model. The

vertical profile colors represent relative amplitude of the GPR signal. Shades of light blue to white indicate the highest amplitude signal, while black and red represent the lowest amplitudes. Appendices I through V include every other GPR profile performed in a southwest direction across the survey area. The profiles are a fusion of the data from both antenna frequencies (300 and 800 MHz) into a single cross section.

RESULTS

The GPR results show multiple high-amplitude reflectors across the survey area. Most of the reflections are associated with the numerous underground utility lines beneath the survey area, as well as related metallic surface features such as valve and utility hole covers and storm drains. Utility lines appear as hyperbolas or "chevrons" where the GPR profile crosses them at a high angle, and as continuous reflections when the profile runs parallel and close to the trace. On Figure 2, water lines (blue) are shown only where they were clearly visible on the GPR records. Metallic surface features produce reflections that "ring" all the way down through the record. These are actually multiple returns of the transmitted pulse as it bounces back and forth in the air between the antenna and the metal target (see Figure 4 and Appendices). The labels on the GPR features in Figure 4 and the Appendices are interpretive, not definitive. None of the identified anomalies resemble the expected reflection pattern for voids beneath the roadway.

Three adjacent anomalous areas are located beneath the west-bound lane (near 15318+00), between several suspected water lines and multiple water valves (hatched in Figure 4). These areas show high-amplitude GPR reflectors, including downward-dipping reflectors possibly consistent with settlement of utility trench backfill materials. The two westernmost areas were identified in the June 2019

RETTEW

Page 3 of 3 Sunoco Logistics, l.P, October 22, 2019 Revised January 3, 2020 RETTEW Project No. 096303003

GPR survey by RETTEW. The third is coincident with a known backfilled excavation area. This GPR reflection pattern is characteristic of settlement or subsidence, as opposed to most of the GPR reflectors across the site that are associated directly with utility lines or disturbed soils around and above the buried utilities. The three anomalous areas (near 15318+00) are located between water lines and water valves and therefore may be related to settlement of the water line trench materials or associated with other past events not related to the recent IR. A larger area of high-amplitude reflectors (near 15320+00) was observed in the eastbound lane, southeast of the Carriage Drive intersection (Figure 4). These GPR reflectors also show characteristics of settlement or subsidence, but do not appear to be associated with observed underground utility lines. These reflectors may be related to pre-road construction or pre-road land use and do not appear to have had an impact the current roadway condition. None of the anomalies display reverberation of the type commonly associated with air-filled voids. No subsurface voids were identified by GPR in the survey area.

LIMITATIONS

The survey described above was completed using standard and/or routinely accepted practices of the geophysical industry, and the equipment employed represents, in RETTEW's professional opinion, the best available technology. RETTEW does not accept responsibility for survey limitations due to inherent technological limitations or unforeseen site-specific conditions. We will notify you of such limitations or conditions, when they are identifiable.

Please also note that the survey is based on observation of current subsurface conditions. Therefore, while the results of this survey can be used to guide further investigations, RETTEW cannot make any warranties concerning future subsidence occurrence - particularly under the influence of altered surface and subsurface drainage patterns due to grading and construction activities.

We have enjoyed and appreciated the opportunity to have worked with you. If you have any questions, please do not hesitate to contact the undersigned. ulft_ Charles Hp:q MSc, PG Senior Project Manager

/4LKvl8/4 Felicia e11 Bechtel, MSc, PG Director of Geophysics

Enclosures

Figure 1: Topographic Basemap Figure 2: Data Coverage Map Figure 3: GPR Horizontal Slice Maps Figure 4: Data Summary Map Appendices 1-V: GPR Profiles Attachment 1-June 2019 53-0460 Boot Road GPR Survey at Wilson Drive Report

Z:\Shared\Projects\09630\096303003 - SL- Greenhill Road Geophysics\GP - Boot Road GPR\REPORT PIECES\S3-0460 Greenhill Rd Revised Final Report 20202 -01-03.docx

RETTEW.

'l1 5 7 " . 11.a. a 3 C l!; V, 5;

0 " 0 ol " :,- ;;· :;; ,:: V, V, . : :' ;

ol ;.a. s;:; 0 ,..!"

•

r 0 0 m AiD-.,,!?.A

z 6

1

Gl. 0 " :,-B.& V, C : Ei

rv[ 0 .. g E "' 0 8

I!; 8

I Cl '" 0 "O .,, :T 0 - l "

!!!, V) ,.. C: "l C :,: 0 < 0 ,-'" F "" '" G ::, 3 a. H

I

\. ) , )."l'l' J .... .· <'t · t.t •

- :'<>( ,<.:-..- ·,;,,, 1\ {1"-.:, r . ., .. ,·•,)' ' '•;,,< •. => :.'. ?- / \ '. •. i J ' . .> -

,,... A.._\ ,,,, I ,., · f @

':,.C...:..._ ._-\,:,,,,tr 1'·

-89, ..... , · .}.:.

;) < T I

I'

1f',., ti' . _,)

Figure 1: Topographic Basemap RETTEW I

···

East Boot Road/Greenhill Road

S3-0460

(lifSHltCOUIITV,PA.

.... · ··---- .,,_..._......_... EHVIROSCAU

uncw UtldStrdo:u, !ti<. l010C....,nt,l,Aun.,.,l,ru1ht,M 17601 Phon,l-100-7l8-U9J

'' ,,

. .J

( .. ,1) t

,;,il'i'

,·

h:,t/.t,,; l'J

SURVEY DATE:

RETTEWNo.:

REVIEWED BY:

DRAWN BY: DATE:

SCALE:

FIGURE NO.

\

09/25/2019 096303003 FKB ----

CHR 10/17/2019 1" a 2000' lof 4

,n 13

Goshen Fire Company Monthly Operations Report January 2020

Fire Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total - Fire

Fire Police Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total - Fire Police

EMS Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total - EMS

Total Responses per Municipality East Goshen West Goshen Westtown Willistown Other Total - Goshen Fire Company

Monthly Responses

25 27 7 6 9 74

Monthly Responses

10 18 3 2 3 36

Monthly Responses

177 108 23 16 9 333

Monthly Responses

212 153 33 24 21 443

Monthly Manhours

72 78 22 12 71 255

Monthly Manhours

29 63 2 1 9 104

Monthly Manhours

273 131 34 42 14 494

Monthly Manhours

374 272 58 55

94 853

YTD Responses YTD Manhours 25 72 27 78 7 22 6 12 9 71

74 255

YTD Responses YTD Manhours 10 29 18 63 3 2 2 1 3 9 36 104

YTD Responses YTD Manhours 177 273 108 131 23 34 16 42 9 14 333 494

YTD Responses YTD Manhours 212 374 153 272 33 58

24 55 21 94 443 853

Goshen Fire Company Monthly Operations Report January 2020

Monthly Updates

Key Indicators I Automatic Fire/CO Alarms 30

Major Incidents Assist WCFD House Fire 250 Blue Rock Rd E Bradford 1/1/2020 Assist WWFC House Fire 1514 Grovenor Ct W Whiteland 1/3/2020 Assist Delco House Fire 67 Vineyard La Middletown 1/8/2020 Search - 934 Aronomink Drive East Goshen 1/23/2020 Assist WCFD Bldg Fire 500 Willowbrook La W Goshen 1/23/2020 Minor Bldg Fire 1301 West Chester PK East Goshen 1/29/2020

Fundraising Activities Annual Subscription Drive Underway Annual Business Contribution Drive Underway

Personnel Updates Fire Chief Appointment - Chris O'Neill EMS Chief Appointment - Gary Weigel Fire Police Chief Appointment - Phil Salas Relief Association President - Ted Harrison IV

Apparatus Updates I New Braun Ambulance due for delivery Feb. 14

41%

Rick Smith

From: Sent: To: Subject: Attachments:

Rick,

Keith Johnson < kjohnson@malvernfireco.com> Thursday, February 6, 2020 12:04 PM

Rick Smith Malvern EMS January Statistics

EGT 2020.docx; Jan 2020 EMS Call Statistics.pdf

Attached are Malvern's EMS stats for January. Please let me know if you have any questions.

Thanks,

Keith

Keith Johnson ATC, NRAEMT EMS Chief Malvern Fire Company

1

2020 Jan Calls 178 Call Types Erner. Transfer 0 Event Standbv 0 Fire 7 Medical 155 MVA 16 Relocate 0 Routine 0 ALS/BLS ALS 109 BLS 69 Municipalities Charlestown Two. 4 E. Goshen Two. 30 E. Whiteland Two. 34 Malvern Bero. 27 Tredvffrin Two. 2 W. Goshen Twp. 1 Willistown Twp. 80 Hospital BMH 1 Outcome CCH 3 LH 1 PMH 108 RMH 1

Malvern Fire Company EMS

2020 Statistics

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totals

178 0 0 7 155 16 0 0 109 69 4 30 34 27 2 1 80 1 3 1 108 1

January:

Malvern Fire Company 424 East King Street Malvern, PA 19355

East Goshen Township

2020 EMS Statistics

30 Calls; 5 BLS (4 Transports); 25 ALS (16 Transports) 1 Fire; 29 Medical

Main 610-647-0693 Fax 610-647-0249 www.malvernfireco.com

Good Fellowship Ambulance & EMS Training Institute

2019 OPERATIONS REPORT

Municipality Count % of Calls West Chester 1746 29.05% West Goshen 1556 25.89% East Goshen 652 10.85% Westtown 595 9.90% East Bradford 551 9.17% West Whiteland 295 4.91% West Bradford 209 3.48% Thornbury 120 2.00% Birmingham 89 1.48% Willistown 39 0.65% Pocopson 28 0.47% Downingtown 20 0.33% Newlin 18 0.30% Caln 14 0.23% East Whiteland 14 0.23% Pennsbury 14 0.23% Uwchlan 10 0.17% Kennett 6 0.10% Chadds Ford, Delco 4 0.07% East Marlborough 4 0.07% Coatesville 3 0.05% Concord, Delco 3 0.05% East Caln 3 0.05% Kennett Square 3 0.05% Easttown 2 0.03% Middletown, Delco 2 0.03% Tredyffrin 2 0.03% Edgmont, Delco 1 0.02% Elverson 1 0.02% Honey Brook 1 0.02% Malvern 1 0.02% New Garden 1 0.02% Sadsbury 1 0.02% Valley 1 0.02% West Vincent 1 0.02% 6010

Non-Transport Breakdown Refusal 523 Recalled Enroute 329 .... Recalled On Scene 481 No Services 416 Lift Assist 124 DOA 40 Released to BLS 37 External ALS Assist 1 1951

CALL VOLUME

Thornbury

2,00%

Total Calls Comparison 2018 2019 +/- 6250 6010 -240

Total Transports Comparison 2018 2019 +/- 4278 4059 -219

./ / ,-. illi I ll

m

Call Volume By Hour

00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

/

/

/i

/ /

Sunday

1st Call

cf:' ,,,<A <:\ t::, ,f, .... ,,, «

Call Volume By Day of Week

Monday Tuesday Wednesday Thursday

Call Sequence

Friday

2nd Call 3rd Call 4th Call 5th Call

lnterfacility Transports

Saturday

6th Call

I i I • • i •

,,, ....

t::-e # .... $ ,to ,to -Q -,.:s " % & ;§> ,$ e; o¢l e cf ,e 0 e

Total lnterfacility Transports: 95

HOSPITAL DESTINATION INFORMATION

·--············ ......... .!::.ceiving H?,..P.l!. 1 Total ......................... Chester County Hospital 3218 53.5%

Not Transported 1951 32.5%

Paoli Hospital 679 11.3%

Paoli Hospital (Trauma Alert) 69 1.1%

Brandywine Hospital 46 0.8%

Riddle Hospital 18 0.3%

Nemours Al du Pont Hospital 19 0.3%

Christiana Hospital 3 0.0% .. ..... . , .................... Crozer-Chester Medical Center .. Bryn Mawr Hospital

Children's Hospital of Philadelphia

Jennersville Hospital

Paoli Hospital (Trauma Alert)

1.1%

Transported: Not Transported:

3 0.0% ,.,,nnn••••••••••••••·no,·,·,·m,·,·••n---

2 0.0% 1 0.0% 1 0.0% 6010

4059 67.5% 1951 32.5% 6010

VEHICLES

Call Volume By Vehicle

Ambulance Ambulance Ambulance Ambulance Ambulance Ambulance Medic SSA Medic 55B Utility 55 Supervisor Rehab SSA SSB SSC SSD SSE SSF

Notes: Ambulance 55D - Used as spare ambulance only in early 2019. Replaced in Fall 2019. Utility 55 - New vehicle added to fleet in Fall 2019.

PATIENT DEMOGRAPHICS

Patient Age Ranges

0-17 18-25 26-35 36-45 46-55 56-65 66-75 76-85 86+

MISCELLANEOUS CALL INFORMATION

Average Times

Dispatch To Enroute 1.41

Enroute To On Scene 6.59

, ....... ....... .... .. . ...................... ................ On Scene Time 14.20

Transport Time 10.21

Dispatch To Available 41.81

Covering Other Agencies

Goshen Fire Co 254 ............................... , __________ ........................... ____ , Uwchlan Ambulance 62 .............................. ,, __________ , .................................................... . Longwood Fi re Co

Minquas Fire Co

Malvern Fire Co Concordville Fire Co East Whiteland Fire Co

Washington Hose Co

Berwyn Fire Co

Brandywine Medic 93 Riddle Hospital EMS

Avondale Fire Co

56

42

39 22

6

3

3

2

2

1

Elverson-Honey Brook Area EMS 1 493

Calls Covered By Other Agencies

BLS Covered Calls ALS Covered Calls

BLS & ALS Covered Calls

Responses By Station

Main Station (Station 55)

East Goshen (Station 155} East Bradford (Station 255}

11 15

6 32

5667 173 170

Call Types Bl.S - Fall / Lift Assist

Bl.S -Sick Person Al.S - Respiratory Difficulty

Al.S -Cardiac Problems

Accident - Bl.S Bl.S - Emotional Disc,rder

ALS - Overdose

!njured Person Al.S -CVA/Stroke EMµ - Stand By -Fire

Bl.S -Syncope Abdominal Pain Al.S -Diabetic E'!'ergency

Seizures Hemorrhaging Al5 - Unre_!ponsive Person

Bl.S -Injured _l'erson ALS - Unconscious Person

ALS -Hyp9tension

¶LS :._Syncope Al.S -Cardiac/Resp Arrest

Alarm -Bl.S Medical Allergic / Medication Reaction

Bl.S - Overdose Bl.S - Unknown Nature

Accident -ALS

Al.S-Fall ALS - Seizures

Back Pain Bl.S • DOA Hyp,e_r Tension

Assault Bl.S - Abdominal Pain · -Injured Person Accident· Entrapment

Accident -Pedestrian Exposure to Heat / Cold

¹ Choking Maternity / Labor Pain

Al.S -Hemorrhaging

Bl.S - Seizures BLS • Back Pain ----

Laceration Bl.S - Hem.c,rrhaging

Alarm • Carbo11_ »<,>noxid_Ec Al.S -Allergic/Med_ Reaction

Fire - Water Rescue

Standby Al.S -Abdominal Pain Al.S -Emotional Disorder

Bl.S • Assault wf!!1ju¼y

Al.S-Sh':'_':'ti_!'_g _ Accident -Involving Fire

Fire - Hazmat _ ALS-Assault w/lnjury

A½Poisoning Bl.S -Exposure to Heat/Cold

Al.S - Back Pain Al.S - Ex osure to Heaycold

l:l_¾_{ll¿rgic/Med ReÀction Bl.S - Maternity/Labor Pain

Burns • ScaÁi_,:,_g / Other

EMS -StanE_By- Event Al.S -Burns -Chemical

ALS ·Burns· Misc Al.S -Âaternity/Labor Pains

Al.S -Stabbing Ã-Burns • Misc

Burns - Chemical Fire -Other T pe Rescue

673 11.2% 653 10.9% 590 9.8% 531 8.8% 289 4.8% 286 4.,!l´ 250 4.2% 222 3. 7% 189 3.1% 189 3.1% 148 2.5% 146 2.4% 125 2.1% 125 2.1% 120 2.0% 119 2.0% 104 _!.7% 100 1.7% 78 1.3% 69 1.1% 64 1.1% 63 1.0% 62 1.0% 61 1.0% 61 1.0% 58 1.0% 52 0.9% 47 0.8% 47 0.8% 40 0.7% 32 0.5% 30 0.5% 28 0.5% 28 0.5% 27 0.4% 24 _().4r¸ 24 0.4% 23 0.4% 21 0.3% 19 0.3% 18 0.3% 17 0.3% 16 0.3% 15 0.2% 12 0º 11 0.2% 11 0.2% 11 0.2% 11 0.2% 10 0.2% 9 0.1% 9 0.1% 6 0.1% 0.1% 4 0.1% 3 0.0% 3 0.0% 3 0.0% 2 0.0% 2 0.0% 2 0.0% 2 0.0% 2 0.0% 2 0.0% 1 0.0% 1 0.0% 1 0.0% 1 0.0% 1 0.0% 1 0.0% 1 0.0% 6010

GOSHEN FIRE MARSHALL INCIDENT REPORT ALARM# N/A

STATION I

DATE See below 02101120 I

DAY Friday I WEATHER

Rain cold

LOCATION Bellingham Longwood building

CONDITION ON ARRIVAL Smoke

RESPONSE 54-1 _ 54-2 8 L-54 154-3 TAC 54A1 -

MUTUAL AID

STRUCTURE OCCUPANT NAME FIRES

OWNER NAME COMPLETE FOR EACH ADDRESS OR BUILDING

OCCUPANCY TYPE

- R-54 .- 54A2 - -

PHONE#

ADDRESS

PHONE#

I

BOX# 5655

SQUAD tJ

154A3

I

STORIES

CONSTRUCTION ROOF

VEHICLE OWNER NAME ADDRESS FIRES PHONE#

OPERATOR NAME ADDRESS

PHONE#

MAKE MODEL YEAR LICENSE

COMPLETE AREA OF ORIGIN FOR ALL Third floor air handler FIRES

METHOD OF IGNITION Motor short

EXTENT OF DAMAGE Slight smoke damage in area of short

INSURANCE INSURANCE CO. NAME POLICY#

ALL FIRES WITH BLDG COVERAGE $ LOSS

CONTENTS COVERAGE $

REMARKS Companies dispatched. 54-56-51-52-03-04-05

REPORT SUBMITTED BY: CRB

MUNICIPALITY EG

ALARM TYP a., BUILDING _ i..i----,. DWELLING ___ VEHICLE --- TRASH --- BRUSH --- AUTO ALARM --- FALSE ALARM --- HAZMAT --- SMOKE INVEST. --- ODOR INVEST. --- RESCUE --- MUTUAL AID --- MISC · -.f. - PUBLIC SERV. ---i---.:.

COMPANY TIMES

DISPATCH 1331 --·-· ON SCENE UNDER CONTROL_

.

_. --·-· TIME IN

TOTAL 1188 --·-·

# FIREFIGHTERS

LOSS VALUE FD ESTIMATE ONLY

BLDG VALUE $ 10m BLDG LOSS $ 5000.00. CONTENTS LOSS

$0

TOTAL $

FIRE RELATED

INJURIES CIVILIAN --· FIRE SERVICE --

FIRE RELATED

DEATHS CIVILIAN --· FIRE SERVICE --·

ATTACH EMS REPORT

F:\Data\Shared Data\Code Dept\Fire Marshal\GOSHEN FIRE MARSHALL INCIDENT REPORT.doc

-----Original Message-----

From: Carmen Battavio <cbattavio@eastgoshen.org> Sent: Tuesday, February 11, 2020 9:18 PM To: Rick Smith <rsmith@eastgoshen.org>; Marty Shane <emshane@aol.com>; Jon Altshul <jaltshul@eastgoshen.org> Cc: Mark Miller <mmiller@eastgoshen.org>; Mike Holmes <mholmes@eastgoshen.org> Subject: Bellingham FD connections

Good morning, I did a follow up this morning on fire department connection at Park Lane and Brookside. This was sent to the code department for a follow up and to notify Bellingham of corrected changes needed. The sprinkler stand pipes are very hard to see and would create a potential problem when fire departments arrives and need to supplement the sprinkler systems.

Mark Miller was also involved with me. I also copied Goshen fire company so that they would know of the corrected actions

>> » Brookside (the kitchen area) Will need a minimum of two, I recommend three approved signs >> >> Park lane needs a recommendation of at least two signs >> » I will be happy to meet anyone to see but should be done ASAP » Carmen R. Battavio

1

Memo

To: Board of Supervisors From: Jon Altshul Re: January 2020 Financial Report Date: February 7, 2018

As of January 31st, the general fund had revenues of $289,479 and expenses of $971,226 for a year-to­ date deficit of $681,968. Because January is a slow month for revenues and some key annual expenses are front-loaded, this is not an unusual position for the first month of the year. However, relative to the year to date budget, there is a positive budget variance of $57,859. As of January 31'', the general fund balance is $4,771,907.

On the expense side, Public Works is well under budget (-$39,960) to the lack of snow this winter. Codes is also under-budget due to a strong start to permitting activity. Other departments are more or less where they should be.

On the revenue side, Earned Income Tax (+$21,730) and Local Services Tax (+$2,245) had a strong January. Real Estate Property Tax bills were mailed out on January 30th, and we began to receive receipts in early February. Real Estate Transfer Tax, reflecting sales in December, was $9,180 under budget, but this is simply a reflection of the traditionally slow holiday real estate market.

Other funds

• The State Liquid Fuels Fund had $2 in revenues (the annual payment is usually received in late

February) and $0 in expenses. The fund balance was 1,150. • The Capital Reserve Fund had $82,653 in revenues and $18,527 in expenses. The fund balance was $5,474,661. • The Transportation Fund had $698 in revenues and $305,342 in expenses. The fund balance was $607,080. • The Sewer Operating Fund had $342,930 in revenues and $135,767 in expenses. The fund balance was $1,183,597. • The Refuse Fund had $89,762 in revenues and $100,305 in expenses. The fund balance was $618,651. • The Bond Fund had $6,658 in revenues and $36,969 in expenses. The fund balance was $3,685,329. • The Sewer Capital Reserve Fund had $1,216 in revenues and $15,376 in expenses. The fund balance is $2,323,628. • The Operating Reserve Fund had $7,707 in revenues and no expenses. The fund balance is $2,603,831.

]cicaunt 1iltle

EMERGENCY SERVICES EXPENSES PUBLIC WORKS EXPENSES ADMINISTRATION EXPENSES CODES EXPENSES PARK AND RECREATION EXPENSES TOTAL CORE FUNCTION EXPENSES

EMERGENCY SERVICES REVENUES PUBLIC WORKS REVENUES ADMINISTRATION REVENUES CODES REVENUES PARK AND RECREATION REVENUES TOTAL CORE FUNCTION REVENUES

NET EMERGENCY SERVICES NET PUBLIC WORKS NET ADMINISTRATION NET CODES NET PARK AND RECREATION lcoRE FUNCTION NET suBTOTAL

DEBT - PRINCIPAL DEBT - INTEREST I TOTAL DEBT

!TOTAL CORE FUNCTION NET

NON-CORE FUNCTION REVENUE

EARNED INCOME TAX REAL ESTATE PROPERTY TAX REAL ESTATE TRANSFER TAX CABLE TELEVIS.FRANCHISE

LOCAL SERVICES TAX OTHER INCOME I TOTAL NON CORE FUNCTION REVENUE

NET RESULT

EAST GOSHEN TOWNSHIP GENERAL FUND SUMMARY

As of January 31, 2020

2(!)Q,0 202-0

Arnriu.ial Budget Y,'H> Budget

4,379,933 413,490 2,774,562 205,312 1,886,456 250,855 522,011 47,073 881,005 40,890 10,443,967 957,620

72,000 2,458 1,000,284 508 318,829 14,447 272,870 14,132 132,620 9,545 1,796,603 41,090

4,307,933 411,032 1,774,278 204,804 1,567,627 236,408 249,141 32,941 748,385 31,345 8,647,364 916,530

349,999 203,872 5,197 553,871 5,197

9J,^!ll,,2'35 921,727

5,130,800 119,115 2,042,779 1,066 650,000 45,000 457,200 345,000 7,853 575,456 8,866

9,201,235 181,900

0 739827

2020 $ % ¥TD Actual Variance Vr.1rrlante

413,874 384 0.1% 181,583 (23,729) -11.6% 270,453 19,598 7.8% 50,608 3,535 7.5% 49,677 8,787 21.5% 966,195 8,575 0.9%

2,357 (101) -4.1% 16,739 16,231 3195.2% 30,436 15,989 110.7% 24,024 9,892 70.0% 15,722 6,177 64.7% 89,278 48,188 117.3%

411,517 485 0.1% 164,844 (39,960} -19.5% 240,017 3,609 1.5% 26,584 (6,357) -19.3% 33,955 2,610 8.3% 876,917 (39,613} -4.3%

0 0.0% 5,251 54 1.0% 5,251 54 1.0%1

882,168 (39,J59) -4.3%1

140,845 21,730 18.2% 1,216 150 14.0% 35,820 (9,180) -20.4%

0.0% 10,098 2,245 28.6% 12,222 3,356 37.9%

200,201 18,301 10.1%1

(681,968) 57,859

RECEIP 310 320 330 340 350 360 380 390

01/01/20 BEGINNING BALANCE

TS

TAXES LICENSES & PERMITS FINES & FORFEITS JNTERESTS & RENTS INTERGOVERNMENTAL CHARGES FOR SERVICES MISCELLANEOUS REVENUES OTHER FINANCING SOURCES

EXPEN 400 410 420 426 430 450 460 470 480 490

DITURES

GENERAL GOVERNMENT PUBLIC SAFE1Y

HEALTH & WELFARE SANITATION & REFUSE HlGHWAYS,ROADS & STREETS CUL TU RE-RECREATION CONSERVATION & DEVELOPMENT DEBT SERVICE MISCELLANEOUS EXPEND!TURES OTHER FINANCING USES

2020 SURPLUS/(DEFICIT)"

CLEARING ACCOUNT ADJUSTMENTS

01/31/20 ENDING BALANCE

U:\.JAl!shul\Quarter1y reporra\01 202012020-01 All Funds Summary.xlsx

SUMMARY OF FUNDS REPORT (AKA "JOE REPORT')

ALL FUNDS JANUARY, 2020 ȯ NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS

GENERAL LIQUID FUELS CAP RESV TRANSPORT SEWER OP. REFUSE FUND* STATE FUND FUND FUND FUND FUND

$5,625,871 $1,148 $5,410,535 $911,724 $976,435 $629,194

$188,089 $0 $0 $0 $0 $0 $696 $0 $0 $0 $0 $0 $5,657 $0 $0 $0 $0 $0 $19,594 $2 $4,285 $698 $963 $401 $0 $0 $78,368 $0 $0 $0 S45,536 $0 $0 $0 $341,967 $89,361 $14,464 $0 $0 so $0 $0 $15,983 $0 $0 $0 so $0

$290,019 $2 $82,653 $698 $342,930 $89,762

$139,511 $0 $10,378 $0 $0 $0 $607,722 $0 $6,500 $0 $0 $0 $15,511 $0 $0 so $0 $0 so $0 so $0 $110,390 $100,305 $141,204 $0 $600 $305,342 $0 $0 $41,647 $0 $0 $0 $0 $0 $99 $0 $1,049 $0 $0 $0 $5,414 $0 $0 $0 $25,377 $0 $208,087 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$1,159,195 $0 $18,527 $305,342 $135,767 $100,305

($869,176) $2 $64,126 ($304,644) $207,162 ($10,543)

$15,211

$4,771,907 $1,150 $5,474,661 $607,080 $1,183,597 $Ȱ

Page 1 of1

SEWER CAP OPERATING TOWNSHIP MUNICIPAL BOND RESV FUND RESERVE FUNDS AUTHORITY FUND

$2,337,788 $2,596,124 $18,488,820 $24,873 $3,715,640 $22,229,332

$0 $0 $188,089 $0 $0 $0 $0 $696 $0 $0 $0 $0 $5,657 $0

$0 $1,216 $7,707 $34,867 ($14) $6,658 $0 $0 $78,368 $0 $0 $0 $0 $476,863 $0 $0 $0 $0 $14,464 so $0 $0 $0 $15,983 $15,376 $0

$1,216 $7,707 $814,987 $15,362 $6,658

$0 so $149,888 $0 $0 $0 $0 $614,222 $0 $0 $0 $0 $15,511 $0 $0 $0 $0 $210,696 $17,600 $0 so

$0

$447,146 $0 $0 $0 $0 $41,647 $0 $36,969 $0 $0 $1,148 $0 $0 $0 $0 $30,791 $0 $0 $0 so $208,087 $0 $0 $15,376 $0 $15,376 $0 $0

$15,376 $0 $1,734,513 $17,600 $36,969

($14,160) $7,707 ($919,525) ($2,238) ($30,311)

$2,323,628 $2,603,831 $17,584,506 $22,634 $3,685,329

21712020

1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, FEBRUARY 4, 2020 5 DRAFT MINUTES 6 7 Present: Chairman Marty Shane; Vice-Chairman David Shuey; Members Michele 8 Truitt, John Hertzog and Mike Lynch; Township Manager Rick Smith; Assistant 9 Township Manager and Finance Director Jon Altshul; Erich Meyer (Conservancy 10 Board); Fire Marshal Carmen Battavio 11 12 Call to Order & Pledge of Allegiance 13 Marty called the meeting to order at 7:00 p.m. and led the pledge of allegiance. 14 Carmen called for a moment of silence in honor of our troops and first responders. 15 16 Recording 17 Marty reported that the meeting was being livestreamed on the Township's 18 YouTube channel. 19 20 Chairman's Report 21 Marty reported that the Board met in Executive Session prior to tonight's meeting 22 for a personnel matter and that the Zoning Hearing Board will conduct a public 23 hearing concerning the Malvern Institute on February 10, 2020, at 7pm. David 24 clarified that the purpose of the hearing was not to render a decision on Judge 25 Tunnell's order, but to establish a process for moving forward. 26 27 Public Comment on Non-Agenda Items 28 Bill Guyer, 1560 Tanglewood Drive, expressed concerns about what he called 29 "misrepresentations" about the noise ordinance expressed by his neighbors at the last Board 30 meeting. He stated that the conce1is at his neighbor's house are very loud and frequently 31 last until after 7pm. He stated that limiting the number of noise permits to two per year is 32 reasonable, that the decibel level should be lowered and that the Township should levy a 33 fee for a noise permit. 34 35 Joe Reed, 248 Chatham Way, asked about the Township's plans to constrnct a building 36 with a 15-inch setback. Maiiy stated that there were no such plans. Rick explained that Mr. 37 Reed may be thinking of the TND ordinance that was proposed last year for Paoli Pike, but 38 was not adopted. Jon noted that the front yard set backs in that proposal were 15 feet, not

39

15 inches. 40 41 Fire Marshal Report 42 Cai·men repmied about a minor fire that occurred at 1301 West Chester Pike in a storage 43 garage caused by a halogen light burning a box. Four fire companies responded to the call, 44 and the fire was quickly extinguished. 45 46 Approval of Minutes and Treasurer's Report

1/21/20 January 21, 2020 1

1 David made a motion to approve the minutes of January 21, 2020. John seconded. The 2 motion passed 5-0. Mike made a motion to approve the Treasurer's Report of January 30, 3 2020. Michele seconded. The motion passed 5-0. 4 5 Consider Code of Ethics 6 Mike provided background on the proposed Code of Ethics for Township staff, ABC 7 members, including BOS members and appointed officials. He noted that there is no 8 penalty for Township officials who do not sign the Code of Ethics, but it is an important 9 reminder to all ofus about our responsibility to our constituents. Michele indicated that she 10 would prefer the document to be called a "Code of Conduct" and perhaps go a little fmther, 11 but that she was supportive of the document as written. Mike made a motion to adopt the 12 Code of Ethics for East Goshen Township staff, appointed officials and ABC members, 13 including the Board of Supervisors. David seconded. The motion passed 5-0.

14

15 Consider Escrow Release #8 for 1420 E. Strasburg Road 16 David made a motion to release the final $6,706 in escrow for 1420 E. Strasburg Road. 17 Michele seconded. The motion passed 5-0. 18 19 Acknowledge Receipt of Michele Truitt's Notice of Intention to Participate in the 20 Township's Health Insurance Program 21 Michele indicated that she would be pmticipating in the Township's health and dental 22 insurance plan, as is permitted in Section 606(c)(l) of the PA Second Class Township 23 Code. Mr. Reed asked how much this policy would cost the Township. Michele responded 24 that a family plan costs slightly less than $2,000 per month. 25 26 Consider Authorizing the Chairman to Execute the Declaration of Restrictive 27 Covenant for Hershey's Mill Dam 28 Rick explained that a restrictive covenant for the Hershey's Mill Dam was a condition for 29 the DCNR grant. John made a motion to approve the Chairman's signature on the 30 declaration of Restrictive Covenant. Michele seconded. The motion passed 5-0. 31 32 Consider Recommendation to Submit a RTK Request to PennDOT about the 33 Geophysical Survey of Boot Road and Hiring of a Professional Geologist 34 Rick explained that the Pipeline Task Force had requested that the Township hire a 35 geologist to review the Boot Road Geophysical Survey reports and that Pennoni has a 36 geologist on staff who can do this work. Michele made a motion to submit a right-to-lmow 37 request to PennDOT for information about the Boot Road Geophysical Survey and to hire 38 a professional geologist from Pennoni to review the materials and forward their findings to 39 the Board. David seconded. The motion passed 5-0. 40 41 Any Other Matter 42 Mike made a motion to appoint Dana Pizzaro to the Stormwater Appeals Board. John 43 seconded. The motion passed 5-0. 44 45 Michele made a motion to appoint Leo Sinclair to the Conservancy Board. Mike seconded. 46 The motion passed 4-1, with Marty opposed.

1/21/20 January 21, 2020 2

1 2 Correspondence. Reports of Interest 3 The Board acknowledged the following correspondence and report of interest: 4 • PA DEP Letter of January 23, 2020 regarding HDD S3-0471 5 • PA DEP Letter of January 23, 2020 regarding HDD S3-0500 6 7 Rick explained that DEP had lifted its permit bar for drilling the 20" line and is now 8 issuing permits to Sunoco again. David noted that the Pipeline Task Force feels that 9 DEP handled the release of the permit bar inappropriately. 10 11 Public Comment (Continued) 12 Mr. Guyer continued with his public comment about the noise ordinance. Rick 13 discussed the draft changes that he's made to the ordinance since it was discussed 14 on January 21, specifically how it is now targeting construction work after 10pm, 15 rather than noise generally. 16 17 Michele asked Mr. Guyer for clarification on the number of attendees at his 18 neighbor's concerts and whether there are parking issues along Tanglewood Drive. 19 Margie Guyer, 1560 Tanglewood Drive, stated that their primary concern was about 20 noise from the concerts, not parking issues. 21 22 Marty encouraged the Guyers to review the existing noise ordinance to identify any 23 potential changes for the Board's consideration. Mr. Guyer stated that there should 24 be a formal limit on the number of noise permits issued per property per year and 25 more lead time between the issuance of a permit and the date of an event. 26 27 Michele asked about the direction that the speakers were facing and whether 28 changing that direction could mitigate some noise. 29 30 Adjournment 31 Mike made a motion to adjourn at 8:15. John seconded. The motion passed 5-0. 32 33 Respectfully submitted, 34 Jon Altshul 35 Recording Secretary 36 37 Attached: January 30, 2020 Treasurer's Report 38

1/21/20 January 21, 2020 3

TREASURER'S REPORT January 16, 2020 -January 30, 2020 RECEIPTS AND BILLS

!GENERAL FUND

Real Estate Tax $35.00 Accounts Payable $55,678.70 Earned Income Tax $67,300.00 Electronic Pmts: Local Service Tax $3,400.00 Credit Card $1,751.70 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $0.00 Debt Service $5,413.95 Total Other Revenue $47,051.36 Payroll $143,891.43

Total General Fund Receipts: $117,786.36 Total Expenditures: $206,735.78

!STATE LIQUID FUELS FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total State Liqud Fuels Receipts: $0.00 Total Expenditures: $0.00

!CAPITAL RESERVE FUND

Receipts $78,368.00 Accounts Payable $16,009.85 Interest Earned $0.00 Total Capital Reserve Fund Receipts: $78,368.00 Total Expenditures: $16,009.85

!TRANSPORTATION FUND

Receipts $0.00 Accounts Payable $4,742.56 Interest Earned $0.00 Total Transportation Fund Receipts: $0.00 Total Expenditures: $4 742.56

lsEWER OPERATING FUND

Receipts $188,965.55 Accounts Payable $26,547.60 Interest Earned $0.00 Electronic Pmts:

Credit Card $0.00 Debt Service $25,377.21 Total Sewer Operating Fund Receipts: $188,965.55 Total Expenditures: $51,924.81

I REFUSE FUND

Receipts $68,760.18 Accounts Payable $12,285.97 Interest Earned $0.00 Total Refuse Fund Receipts: $68,760.18 Total Expenditures: $12,285.97

!BOND FUND

Receipts $0.00 Accounts Payable $13,000.00 Interest Earned $0.00 Total Bond Fund Receipts: $0.00 Total Expenditures: $13,000.00

lsEWER CAPITAL RESERVE FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Sewer Capital Reserve Fund Receipts: $0.00 Total Expenditures: $0.00

!OPERATING RESERVE FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 1 Total Operating Reserve Fund Receipts: $0.00 Total Expenditures: $0.00

1/21/20 January 21, 2020 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

EAST GOSHEN TOWNSHIP ANNUAL PLANNING SESSION

Tuesday, January 28, 2020

The East Goshen Township Board of Supervisors held the Annual Planning Session on Tuesday, January 28, 2020 at 6:00 p.m. at the Township Building. Those in attendance were:

Board of Supervisors Marty Shane, Chairman Michael Lynch Michele Truitt John Hertzog

Conservancy Board Erich Meyer Daniel Flynn

Pipeline Task Force Bill Wegemann Christina Morley

Futurist Committee Brian Sweet

Historic Commission Charles Proctor Ed Lendrat

Township Staff Rick Smith, Township Manager

Municipal Authority Kevin Cummings Dana Pizarro

Park & Recreation Commission Daniel Leicht, Chairman Deborah Snyder Eric Tobin Peter Knupp Kishor Thakarar Joe Zulli

Planning Commission Mike Koza John Stipe

Dan Daley

Sustainability Advisory Committee Christi Supple, Chair Kipp Happ

Jon Altshul, Asst. Township Manager & CFO Mark Gordon, Township Zoning Officer Jason Lang, Director of Parks and Recreation

Mark Miller, Director of Public Works

Marty Shane opened the meeting at 6:25 pm. He welcomed everyone and thanked them for coming. Mike Lynch led the Pledge of Allegiance and a moment of silence for our troops, police and first responders.

Conservancy Board Erich Meyer explained that the mission of the Conservancy Board is to preserve the natural resources in East Goshen Township. Their accomplishments for 2019 are:

Annual Session 1-28-2020 1

1 1. Keep East Goshen Beautiful Day was held on April 13th. The weather was 2 good this year. We had a good number of volunteers on the actual day along with 3 some groups that picked up trash during the following week. 4 2. Fall Planting- In November we planted 6 trees in the 5 wetlands/boardwalk area along East Boot Road. Public Works assisted us with 6 digging the holes using an auger. The trees were procured from Sam Brown's 7 Nursery in Malvern. The following trees were planted: 8 a. 1 each-Taxodium D Falling Waters- 6 ft (Common Name: Bald Cypress) 9 b. 2 each - Betula N Dura Heat- 8 - 10 ft (Common Name: River Birch) 10 c. 1 each - Magnolia Virginiana - 8 ft (Common Name: Sweet Bay Magnolia) 11 d. 1 each - Metasequoia Glyptostrobodies - 7 ft (Common Name: Dawn 12 Redwood) 13 e. 1 each - Cercis Canadensis - 8 ft (Common Name: Eastern Redbud) 14 3. Work continued with the Township and the Marydell Pond Committee on 15 the restoration of Marydell Pond. 16 4. Continued invasive species control. 17 5. Continued maintenance of the blue bird houses in Applebrook. 18 19 Goals for 2020 20 1. Keep East Goshen Beautiful Day will be held on April 18, 2020. 21 2. Continue maintenance of the blue bird houses in Apple brook 22 3. Continue maintaining Clymer's Woods - replacing dead trees and 23 reapplying wood chips around the trees. 24 4. Maintain the riparian buffer along the creeks 25 5. Continue invasive species control. 26 6. Continue assisting with the pond restoration projects as needed. 27 28 4. Maintain the riparian buffer along the creeks. 2 9 5. Continue invasive species control. 30 6. Continue assisting with the pond restoration projects as needed. 31 Erich mentioned that Michele Truitt is the Board's Liaison. They need 1 new 32 member. 33 34 Futurist Committee 35 Brian Sweet commented on the Commission's Vision Statement: Nearly 6 years ago, 36 the East Goshen Board of Supervisors established a Futurist Committee to assess 37 future challenges and opportunities for our township. After evaluating the unique 38 needs of our community, as well as determining the attributes which have made 39 other community vibrant, the committee's long-range strategic recommendation for 40 the township is to differentiate East Goshen Township in positive ways compared to 41 other townships in eastern Chester County, in a way that; 42 • creates welcoming key road portals with attractive landscaping, warm 43 lighting and signage that reflects the township's history and future hopes. 44 • connects our neighborhoods and town center with a network of multi-use 45 trails. 46 • expands our already acclaimed recreational and activities programs.

Annual Session 1-28-2020 2

1 • creates a town center with a strong sense of identity as a "gathering place". 2 This would include green space and public plazas, restaurants and specialty shops, 3 and a modest amount of housing that appeals to buyers seeking a variety of new 4 housing options. 5 ... So that the township will have a bright future, because it will always be viewed as 6 a premier community with excellent housing, public amenities and excellent schools 7 for families seeking a new house. 8 9 2019 Results 10 1. Supporting the TND overlays with dialogue between ABCs 11 2. Outreach to other AB Cs for alignment on our Vision Statement 12 3. Discussions on things that make Business Parks successful and how EGT 13 can provide them. 14 15 2020 Objectives 16 1. Community outreach meetings and resident communications to gather 17 feedback on what residents want to see or not see in East Goshen. 18 2. Business Park Strategic Plan 19 3. Revisit the Futurist Committee Vision statement with the Board of 20 Supervisors to ensure alignment. 21 22 Jon Altshul commented that all ABCs are expected to provide articles for the 23 newsletter. Also, the township has a Welcome Packet for new residential. He can 24 provide one if the Futurist Committee wants to design one for Commercial 25 companies. 26 Mike Lynch mentioned that there are opening for new members on the FC. 27 28 Municipal Authority 29 Dana Pizarro explained that the Municipal Authority, which is a legally separate 30 entity for the Township, is responsible for financing the construction, expansion and 31 upgrade of the Township's sewage collection and treatment infrastructure. 32 Beginning in 2019, all sewer capital purchases are made through the Municipal 33 Authority, with transfers from the Sewer Operating Fund for both general operating 34 costs and new capital assets and the Sewer Capital Reserve for replacement capital 35 assets. Previously only the MA's operating costs and selected capital expenses were 36 borne by the Municipal Authority. 37 38 2019 GOALS/ACCOMPLISHMENTS 39 1. Continued to monitor the upgrades at the West Goshen Sewer Authority. 40 Members attended meetings. 41 a. East Goshen is responsible for 16. 7% of the costs of any capital

42 improvements at the WGSA plant. Total project estimated at $21 43 million; total EGT share paid approximately $3.5 million. 2017 EGT 44 Bond issued. 45 b. The EGMA actively monitored and tracked costs of the construction 46 project by attending WGSA meetings and conducting periodic site

Annual Session 1-28-2020 3

1 visits to the plant to view the work in progress with support from Jon 2 Altshul and Mark Miller. 3 2. Continue to implement the inflow /infiltration Plan - ongoing 4 a. Asset Management Program/Indicator of Extraneous Flows to 5 Treatment Plants from Groundwater Rainwater into Sewer System 6 from Pipe and structural issues to Ridley Creek and Chester Creek 7 systems. 8 b. In concert with Public Works cleaning and televising. 9 3. Continue to operate the Ridley Creek Sewage Treatment Plant in 10 compliance with DEP permit requirements. 11 a. In compliance January, February, March, April, May, June, July, 12 October, November and December. 13 b. August/September in compliance except total P (limit=0.5 mg/I) 14 marginally above at 0.58 and 0.54 mg/I due to equipment failure of 15 actuator and decanter pressure relief valve. SBR 2 removed from 16 service and SBR 3 placed in service remained within mass loading rate 17 in permit. 18 4. Completion/acceptance of Tallmadge Drive sewer main replacement

19 carried into 2019. 20 5. Ongoing critical infrastructure - preparation for 2020 CIP. 21 22 2020 GOALS

23

1, Continue to monitor the upgrades at West Goshen Sewer Treatment Plant 24 and Westtown Way Pump Station. Members to attend meetings. 25 a. Westtown Way Pumping Station - EGT share estimated at $1.65 26 million. 27 2. Continue to implement the Inflow and Infiltration Plan for the Sewer 28 System - ongoing. 29 3. Continue to operate the Sewer Treatment Plant in compliance with PADEP 30 permit requirement. 31 4. Implement Planned Projects Program: 32 a. Ridley Creek Sewer Treatment Plant 33 * Emergency Generator Replacement $150,000 deferral 34 * Caustic Soda Project to improve worker safety and efficiency 35 for chemical addition at the plant - $160,000 36 b. Pump Stations 37 * Hershey's Mill Pump Station generator replacement- $45,000 38 deferral

39 * Hunt Country Pump Station Mag Meter replacement - 40 $15,000 deferral 41 * Hunt Country Pump Station Muffin Monster replacement - 42 $67,000 deferral 43 * Hunt Country Pump Station Bypass Pump - $99,435 44 carryover 45 c. Sewer System

Annual Session 1-28-2020 4

1 * Two (2) new Ridley Creek Sewer System Permanent Flow 2 Meters - $55,000 carryover. 3 Dana mentioned that Mike Lynch is the MA's liaison. 4 Mike Lynch asked for a description of the Muffin Monster. Dana explained that it 5 has teeth like a shredder which eliminates trash that gets into the system. 6 John Hertzog asked if there will be a rate change. Jon Altshul responded yes but not 7 severe. Dana is a wastewater engineer and he spoke about West Goshen's problems. 8 Kevin Cummings mentioned that there is a list of rates in the surrounding area and 9 East Goshen's rates are pretty low. Jon Altshul mentioned that the Municipal 10 Authority owns the system and leases it back to the Township. Public Works does 11 the maintenance along with Big Fish. 12 13 Park and Recreation Commission 14 Danny Liecht commented that Jason Lang is the most dedicated, caring and best 15 Park and Rec Director this side of the Mississippi. Jason spoke about how well the 16 Commission and he work together. 17 2019 Accomplishments: 18 1. All Park Commission accomplishments are shared with the Public Works 19 Department. They work early, late and tirelessly in support of park operations. 20 2. New events: Diamond Earrings Scavenger Hunt, Goshenville Ghost Walk, 21 Chesco Teen Filmmakers Showcase, Santa at the Blacksmith Shop. 22 3. Hosted 185 parties, 3,300 hours of sports in the park, offered EGT 23 managed 725 programming hours and 400 hours of volunteering opportunities. 24 4. Successfully added beer/wine garden to the Food Truck Festival, 4500 in 25 attendance. 26 5. Created multi-municipal fall Spotted Lanternfly Smash a Thon, won by 27 East Bradford Twp. Special thanks to Gabrielle Long for coordination. 28 6. East Goshen named 2019 PRPS Agency of the Year 29 7. East Goshen named NRPA Gold Medal Finalist community, first in 30 Pennsylvania. 31 2020 Goals 32 1. Develop marketing, programming and trail rules for the Paoli Pike Trail 33 (CP, PROS, MP). The section from Rte. 352 to Reservoir Road will be started in the

34 Spring. It should be open to the public in the Fall.

35

2. Develop plan for 2021 Full Day summer camp program at East Goshen 36 Elementary (PROS). 37 3. Finalize design elements for the amphitheater band shell in preparation 38 for 2021 grant applications (PROS, MP) 39 4. Offer nature and art focused programming. Will partner with West 40 Chester Garden Club to offer Nature Warrior Program (25 kids will be in the pilot 41 program led by Kishor); Photography Shop to offer filmmaking and photo camps; 42 Young Rembrandts to offer youth art programming (PROS). 43 5. Host West Chester University's Carnival of Ruin - a theatrical performance 44 with sustainability at its core. 45 6. Fellow ABCs - consider yourself challenged at this year's Pumpkin 46 Festival!!! Each ABC will design a pumpkin and the public will select a winner!

Annual Session 1-28-2020 5

1 7. CP=Comprehensive Plan; PROS= Open Space Plan; MP= EGT Park Master 2 Plan 3 Marty mentioned the great job Jason does to apply for grants to cover many of the 4 programs. 5 6 Pipeline Task Force 7 Bill Wegemann mentioned that there are 9 pipelines in East Goshen Township now. 8 When Mariner 2 is done there will be 11. Marty explained that the Task Force is an 9 advocacy group. People who interviewed for a position were told they have to do 10 what is good for East Goshen. He thanked them very much for what they've done in 11 this first year. 12 2019 Accomplishments 13 1. Established routine operation of task force. Elected a Chairperson and 14 Vice Chairperson. Held 13 meetings in 2019. 15 2. Reviewed and provided comments on relevant pipeline legislation. 16 Members followed 19 bills that went to the PA. legislature. 17 3. Provided recommendations to BOS on environmental assessment for 18 Adelphia Gateway Project. BOS subsequently filed comments to FERC. 19 4. Provided detailed comments for ANPRO on safety regulations regarding 20 hazardous liquids public utility standards (Docket No. L-2019-30126 7). BOS 21 included these comments in their letter to PUC. 22 5. Provided detailed comments on several HDD Re-Evaluation Reports to 23 PADEP. 24 6. Investigated UV resistance of pipeline coating systems. 25 7. Provided a representative to the Chester County Environment Alliance. 26 8. Connected with Planning Commission to incorporate pipeline safety into 27 future planning projects. 28 9. Recommended that East Goshen Township request a cease and desist 29 order for Bow Tree/Strasburg HDD site based on Notice of Violation issued for 30 Noncompliance. 31 2020 Objectives 32 Note: Many of these objectives are ongoing or continuation of efforts already under 33 way. 34 1. Review and assess regulatory and technical aspects of pipeline 35 infrastructure projects. Provide comments to BOS on relevant pipeline legislation 36 (State and Federal) and regulatory documentation (PUC, FERC, PHMSA, DEP). 37 2. Advise BOS regarding pipeline incidents such as inadvertent returns 38 during drilling, sinkhole formation, ground water issues, noise ordinance violations,

39 spills, leaks and any other environmental violations. 40 3. Recommend securing services of a licensed professional geologist for 41 consultation on relevant documentation, legislation and issues. 42 4. Address questions and concerns from residents regarding pipeline 43 activities. 44 5. Provide input to BOS on communications (i.e. Newsletters, Constant 45 Contact Notifications) to residents regarding pipeline issues and activities. 46 6. Continue investigation of Boot Road Geophysical Survey Reports.

Annual Session 1-28-2020 6

1 7. Provide recommendations to BOS and Planning Commission regarding 2 pipeline setbacks and consultation zones for zoning ordinances. 3 8. Fill vacancy on Task Force. Currently there are only six members. Full staff 4 is seven members. 5 9. Meet with state representatives, state senators, and county commissioners 6 on pipeline issues. 7 10. Provide input to Chester County Pipeline Safety Advisory Board. 8 Contribute to development of an emergency response plan. 9 11. Continue investigation of air quality monitoring and leak detection 10 systems for areas surrounding pipelines. 11 12. Continue investigation of dust monitoring and dust control measures at 12 pipeline construction areas. 13 13. Interact with the Sustainability Advisory Committee. 14 Bill encouraged people to come to the Task Force meetings so they know what's 15 going on. 16 Rick gave an update on the pipeline:

17 1. They will start pulling the 16" line from Bow Tree to Ss. Simon and Jude 18 Church. The 16" line will be done in East Goshen. They will start to drill for the 20" 19 line. 20 Marty gave credit to David Shuey and Mike Lynch for starting the Task Force. 21 22 Historical Commission 23 Chuck Proctor spoke about meetings they had at Hershey's Mill about adding the 24 Sullivan House to the East Goshen township inventory of historic properties. They 25 were very excited to join and asked that the next ornament be about the Sullivan 26 House. 27 2019 Review and 2020 Outlook 28 Historical Commission Ornament - In 2019 we released the second ornament 29 featuring the Sullivan House on the Hershey Mill campus. Ornaments were received 30 in time this year to offer at both Township events and the Sullivan House venues 31 over the holidays. 32 Holiday Sales: 63 of the Sullivan House and 32 Blacksmith Shop. Of 600 ornaments 33 ordered we have 129 in the public's hands. 34 Blacksmith Shop ornaments were 34 sold last year. 35 Of greater concern looking at the buyers, only about 20 people have both. As we 36 move forward, we have to consider setting the base order at 100. This nearly 37 doubles our cost and we net $2-3. But until we have a base supporting the series 38 300 is too many. 39 We will continue to offer the ornaments for sale through the Sullivan House 40 Committee, Blacksmith Shop, Reception Desk and Township events. 41 Historical Events -Thanks to the support of Jason Lang and the P&R Commission, 42 two events were held at the Blacksmith Shop in 2019. 43 1. Escape Room - Bringing to life the escape of several Civil War soldiers 44 imprisoned in the area. 45 2. Ghost Walk- Featuring local tales of witchery and Hessian ghosts. And a 46 local paranormal group sharing their findings in the Blacksmith Shop.

Annual Session 1-28-2020 7

1 Great feedback to have more of these events and at a larger scale. Requires more 2 people and planning to execute. The Ghost Walk alone could draw hundreds of 3 people and wander through the entire park. Will begin planning this with P&R in 4 late Spring. 5 Our Members - We had two resignations in 2019 and are operating with 5 6 members. Of greatest need is to develop or recruit a new board member to take a 7 very active role in the CCHPN. This is our primary source for education and 8 program support at the state level. Collectively we only attended 2 events in 2019. 9 The Blacksmith - We cannot thank our resident Blacksmiths enough. They have 10 engaged with countless folks traveling the area to tell the story of our Township's 11 beginning. The passion they deliver is excellent. Their passion of their work, the 12 shop, and the tale is beyond what we could ask for. Think they will have a story /bio 13 soon coming in the spring newsletter as they emerge from their winter off. 14 2020 - Need to get some of the local scouting troops in for a tour. Would love to see 15 if we could have a blacksmith challenge to see who could win the title making an 16 18th century knife or tool. Would invite the other regional historical commissions 17 and interact with them. Would like to do The Battle of the Clouds presentation 18 again. 19 Chuck mentioned that they would like to have a trail to connect the Blacksmith Shop 20 with the Paoli Pike Trail. They would like to reorganize the HC office in the 21 township building. 22 Marty thanked Ed Lendrat for all he has done to record East Goshen's history. 23 Michele mentioned that she took the Boy Scouts to the Blacksmith Shop for 24 meetings and they were very excited about it. 25 Mike Lynch appreciates wanting to work with other municipalities. East Bradford 26 did some interviews of long-time residents and put a presentation together which 2 7 was very successful. 28 Chuck has talked to Ted about having our area open when there are other events in 29 the area. Michele suggested the Willistown Sugartown Festival. 30 31 Planning Commission 32 Mike Koza mentioned that Chairman Brad Giresi has moved and Ernest Harkness is 33 the new Chairman and the one who wrote the report for this meeting. Mike gave the 34 following report: 35 Planning Commission significant accomplishments for 2019: 36 1. Developed and submitted to BOS Zoning Ordinance (TND Overlay District) 37 to support Comprehensive Plan Strategy 38 • 6.1 Transforming the Town Center into a viable, walkable, visit able 39 place 40 • 6.2 Transforming the Paoli Pike Corridor into a walkable, connected

41

artery 42 2. Developed and submitted to BOS, Incubator Use ordinance changes Comp. 43 Plan 7.3 allowing for new uses and smaller incubator businesses in the corporate 44 parks and the industrial park.

Annual Session 1-28-2020 8

1 3. Supported review of several requests for Home Based Businesses. Comp. 2 Plan 7.7 Continuing No-impact Home-Based Business, Home occupations and Home 3 related Businesses. 4 4. Reviewed and submitted to BOS request for Duckling Early Development 5 Center, PECO modification to Conditional Use for pumping station, CTDI conditional 6 use amendment for change of use, ZEKS request for modification to conditions 7 approval. 8 5. Reviewed and submitted to BOS Ordinance Change in Business Park to 9 support request for Apartment development. 10 11 Planning Commission Goals for 2020: 12 1. Continue support for following Comprehensive Plan implementing 13 strategies: 14 • Objective 6.1 & 6.2 to develop the Town Center and Paoli Pike 15 Corridor 16 • Objective 6.3 transforming the West Chester Pike Corridor into a 17 more functional and attractive artery. 18 • Objective 7.2 promoting the enhancement of business opportunities 19 along the West Chester Pike Corridor. 20 • Objective 9.1 maintaining and expanding the Open Space, 21 Recreation, and Trails Network. 22 • Objective 9.2 developing the Paoli Pike Trail to create the linkage 23 between West Chester and Malvern through East Goshen from West 24 Goshen to Willistown. 25 2. Suggest New Goals for BOS approval 26 • Business Park Vitalization - review BP ordinance for possible 27 enhancements to promote Business Park Longevity 28 • Support BOS request for any review of Zoning Ordinance to support 2 9 Pipeline Safety 30 • Support BOS request to review existing township Zoning 31 Ordinances for possible revision and updates. 32 33 Marty commented that the Comprehensive Plan has a schedule of projects, listing 34 what they are and when they should be done. He encouraged all AB Cs to review 35 what is in the Comp Plan for them. He appreciates everything the Planning 36 Commission does. 37 Mike Lynch mentioned that the PC keeps up to date with the latest trends.

38 39 Sustainability Advisory Committee

40 Christi Supple, Chairman, showed a new sign they had made to use at events. She 41 thanked the BOS for starting the Committee to encourage more environmentally 42 sustainable practices here in East Goshen. 43 Let me introduce our Vice Chair, Kipp Happ, a talented architect and project 44 manager, who brings a wealth of expertise with green building initiatives to our 45 work. We are privileged to include Tom Kilburn, East Goshen's guru for new growth 46 initiative; Monica Close who served admirably on the Planning Commission and

Annual Session 1-28-2020 9

1 brings wonderful ides to our meetings. Jeff O'Donnell a media expert extraordinaire, 2 who is leading our soon to be unfolding media roll out. Mary McCloskey, a dynamo 3 with a wealth of educational and community activist experience and Angela 4 Macchiata, an engineer we dearly hope to keep onboard despite her busy work 5 schedule. I'm just the one who turns the lights on and off for the meetings! 6 Our Committee is barely a year old. What we've accomplished to date has more to 7 do with choosing from a long list of potential projects we've discussed to plow 8 forward with this year, than what we can register in the accomplished column 9 already. 10 We introduced ourselves to the East Goshen public at the park last summer with an 11 interactive booth illustrating sustainable suggestions and hands on projects for 12 children. We're working on a number of other programs for the children and East 13 Goshen residents in the park this year 2020. These include working with the Boy 14 and Girl Scouts to help our youngest residents become future environmentalists. 15 Car charging stations for current owners of electric and hybrid vehicles is a goal of 16 our committee. These can be available for East Goshen township vehicles purchased 17 in the future. 18 We are working on a proposal for an East Goshen Community Garden which we 19 hope will lead to a home grown Farmer's Market by 2021. A special component of 20 this will be a designated section of plots for children and teens with training 21 sessions to help them. 22 A parallel program of educational modules for elementary students at our 2 schools 23 is another work in progress. These will be offered as in classroom opportunities, 24 before and after school programs, and assembly presentations. 25 Don't worry! The adults are not forgotten! Starting this March, we are offering at 26 least 4 sessions with experts, including our own East Goshen staff experts. The first 2 7 will focus on Solar and Geothermal options for homeowners and businesses. The 28 second will provide information on Composting, pesticide free lawns and gardens 29 and advice on buying organic products and produce. The third subject will 30 concentrate on water management, to cover storm drains, watering lawns and 31 gardens sustainably, and the purchase and utilization of rain barrels. East Goshen 32 already models this to our community with a rain barrel prominently displayed 33 right out front of the Township building. The fourth presentation will cover how to 34 recycle everything we possibly can to responsibly help protect our environment. 35 Out of these sessions we hope to glean additional ideas to pass along as suggestions 36 to our Supervisors. Perhaps a community compost site where residents can come to 3 7 enrich their gardens without resorting to fertilizers. 38 If you are caught up on your East Goshen Newsletters, you know we are initiating an 39 email chain to provide regular suggestions and elicit ideas from residents who are 40 most passionate about sharing in this way. We've had a great response so far and 41 would love to have you all join us as well! 42 Our intrepid Supervisors have already approved allowing our Committee extra 43 pages in an upcoming Newsletter to share sustainable suggestions. Hopefully this 44 will be in the May Newsletter.

Annual Session 1-28-2020 10

1 We'd welcome collaboration with other East Goshen ABCs on potential joint 2 projects. For instance, we'd like to work to see many more trees planted to begin to 3 counteract the destruction inflicted on East Goshen by the pipeline juggernaut. 4 Once we have a number of workshops under our belts for young people in our 5 elementary schools and park, we aim for a joint program with adjacent townships 6 for the junior and high schools in our area. We also look forward to working with 7 the other Environmental and Sustainability Advisory Committees from adjacent 8 townships and have already begun this collaboration with the West Chester SAC. 9 In summation, we are overflowing with ideas, so talk to us if you have any 10 suggestions and projects we can help carry forward for our dearly loved East 11 Goshen township. Thanks for listening. 12 13 Marty pointed out the difference between the Futurist and Sustainability 14 Committees. He commented again about the importance of getting information to 15 the residents through the Newsletter. 16 Jon mentioned that the Council of Governments will meet tomorrow in West 17 Whiteland Township at 7:00 p.m. COG is comprised of 7 municipalities in Chester 18 County and the West Chester Area School District. He spoke about a study on 19 renewable energy and the local Sierra Club will give suggestions. 20 Mike Lynch feels it is ground-breaking and ambitious and it is time for local 21 governments to work together on renewable energy. It was formed 1 year ago and 22 is a great start at a very important time. 23 Marty thanked Susan D'Amore, staff member, for the refreshments. 24 Mike thanked everyone for attending. He spoke about the hours volunteers put in 25 and what it would be if converted to consultant fees. 26 Rick mentioned that in 2015 the average per hour was $28.00 with a total hours of 27 about 100,000. 28 Marty commented that a survey was taken to change this meeting from Saturday 29 morning to a week night. For those here, is Tuesday better than Saturday. All 30 answered yes. He asked if anyone has suggestions to enhance the meeting please let 31 him or Rick know. This meeting is important so everyone knows what the others 32 are doing. 33 Marty also mentioned that the Hershey's Mill dam should be done this year and they 34 should have permits for the Milltown Dam this year. 35 Jon thanked everyone for what they do. 36 Michele commented that no organization can exist without volunteers. 37 38 Michele moved to adjourn the meeting. Mike Lynch seconded the motion. The 39 meeting was adjourned at 8:00 p.m. 40 41 Respectfully submitted 42 43 44 Ruth Kiefer, Recording Secretary. 45 46

Annual Session 1-28-2020 11

TREASURER'S REPORT January 30, 2020 - February 13, 2020 RECEIPTS AND BILLS

I GENERAL FUND

Real Estate Tax $255,571.11 Accounts Payable $572,791.34 Earned Income Tax $797,850.54 Electronic Pmts: Local Service Tax $70,600.26 Credit Card $0.00 Transfer Tax $50,101.02 Postage $1,000.00 General Fund Interest Earned $5,559.34 Debt Service $0.00 Total other Revenue $76,154.60 Payroll $132,594.95

Total General Fund Receipts: $1,255,836.87 Total Expenditures: $706,386.29

!STATE LIQUID FUELS FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earned $1.67 Total State Liqud Fuels Receipts: $1.67 Total Expenditures: $0.00

!CAPITAL RESERVE FUND

Receipts $0.00 Accounts Payable $280,855.61 Interest Earned $4,228.90 Total Capital Reserve Fund Receipts: $4,228.90 Total Expenditures: $280,855.61

!TRANSPORTATION FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earned $737.66 Total Transportation Fund Receipts: $737.66 Total Expenditures: $0.00

!SEWER OPERATING FUND

Receipts $234,660.70 Accounts Payable $295,576.21 Interest Earned $956.55 Electronic Pmts:

Credit Card $0.00 Debt Service $0.00 Total Sewer Operating Fund Receipts: $235,617.25 Total Expenditures: $295,576.21

!REFUSE FUND

Receipts $45,431.66 Accounts Payable $67,029.29 Interest Earned $394.55 Total Refuse Fund Receipts: $45,826.21 Total Expenditures: $67,029.29

!BOND FUND

Receipts $0.00 Accounts Payable $70,309.00 Interest Earned $6,657.96 Total Bond Fund Receipts: $6,657.96 Total Expenditures: $70,309.00

!SEWER CAPITAL RESERVE FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earned $1,216.34 Total Sewer Capital Reserve Fund Receipts: $1,216.34 Total Expenditures: $0.00

!OPERATING RESERVE FUND

Receipts $0.00 Accounts Payable $0.00 Interest Earnad $808.24 Total Operating Reserve Fund Receipts: $808.24 Total Expenditures: $0.00

TO:

FROM:

SUBJECT:

DATE:

EAST GOSHEN TOWNSHIP

MEMORANDUM

BOARD OF SUPERVISORS

JON ALTSHUL

PROPOSED PAYMENTS OF BILLS

FEBRUARY 13, 2020

Attached please find the Treasurer's Report for the weeks of January 30, 2020- February 13, 2020.

The General Fund revenues reflect disbursements from 2019 Q4 EIT returns, while expenses reflect the February payment to WEGO in the amount of$350,818.

Capital Reserve Fund expenses reflect the cost of the chassis for the two new Dump trucks ($102,826 X 2).

Sewer Fund expenses reflect the QI payment for operations and maintenance to West Goshen ($132,099), as well as quarterly payments to Westtown for sewer flows from Cider Knoll ($19,680) and Summit House ($87,330)

Recommended motion: Mr. Chairman, I move that we graciously accept the receipts and approve the expenditures as presented in the Expenditure Register and as summarized in the Treasurer's Report.

East Goshen Township Fund Accounting

2 : 58 PM

Expenditure History Report

FEBRUARY 2020 Report Date 02/13/20

MARP04 run by BARBARA

Budget# Sub# Check# Vendor Vendor Name/ Description Req # Req Date GL Per Invoice#

BATCH 1 OF 5

PAGE 1

Chk Date Check Amount -------- ---- ------ ------ ----------------------------------- ------ -------- ------ --------------- -------- --------------

01

GENERAL FUND

01410 5300 ************* POLICE GEN.EXPENSE 18885 1471 WESTTOWN-EAST GOSHEN POLICE FEBRUARY 2020 CONTRIBUTION

61061 02/06/20 2002 020120 02/01/20 350,818.03

* 350,818.03* -------- ---- ------ ------ ----------------------------------- ------ -------- ------ --------------- -------- --------------

01410 350,818.03 -------- ---- ------ ------ ----------------------------------- ------ -------- ------ --------------- -------- --------------

01

***** GENERAL FUND 350,818.03 -------- ---- ------ ------ ----------------------------------- ------ -------- ------ --------------- -------- --------------

350,818.03

;ast Gosqen Township Fund Accounting

Report Date 02/12/20

MARP05 run by BJIRBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

01 GENERAL FUND

1777 ADVANCED ELECTRONIC SECURITY 61068 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS ANNUAL PINNACLE CARD MAINTENANCE

6675 02/11/20 02/11/20 1,385.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1903 ALTHOUSE, GARY 61069 1 01487 4600 TRAINING & SEMINARS-EMPLY 010820 WEBINAR PCCA - 1/8/20 61070 1 01487 4600 TRAINING & SEMINARS-EMPLY 012220 WEBINAR PCCA - 1/22/20

68 AMS APPLIED MICRO SYSTEMS LTD. 61071 1 01403 2200 R.E. TAX COLLECT - MISC EXPENSE 66453 2020 CASS CERTIFICATION - TAX 61072 1 01401 3120 CONSULTING SERVICES 66365 W2'S AND LABOR 61073 1 01401 3120 CONSULTING SERVICES 66404 JANUARY 2 02 0 61073 2 01414 5001 ZONING IT CONSULTING 66404 JANUARY 2020 - GEO-PLAN

4217 AQUA PA 61075 1 01411 3630 HYDRANT & WATER SERVICE 020320 279 310033 0310033 12/31/19-1/31/20 186 61075 2 01411 3631 HYDRANTS - RECHARGE EXPENSE 020320 279 310033 0310033 12/31/19-1/31/20 93 61076 1 01411 3630 HYDRANT & WATER SERVICE 020320 HY6 309987 0309987 12/31/19-1/31/20 HY6

82 ASSOCIATED TRUCK PARTS

102

61077 1 01430 2330 VEHICLE MAINT AND REPAIR LAMP KITS

B&D COMPUTER SOLUTIONS 61078 1 01401 3120 CONSULTING SERVICES JANUARY 2020 61078 2 01407 2130 COMPUTER EXPENSE REFURBISH COMPUTER FOR SUSAN D. , IPAD CASE FOR RCSTP

379217

00003283

00003283

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

1,385.00

10.00

30.00

40.00

130.00

215.30

1,097.00

28.00

1,470.30

4,809.96

2,404.98

155.16

7,370.10

279.60

279.60

2,000.00

462.00

1

2ast Gos3en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------ ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3518 BANCTEC INC. 61079 1 01401 3740 MAINTENANCE & REPAIRS FEED ROLLER & BASE PAD - FOLDER MACHINE

92035570

2,462.00

02/11/20 02/11/20 318.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

139 BFMC INC. 61080 1 01403 2200 R.E. TAX COLLECT - MISC EXPENSE EAST GOSHEN TAX BILLS (8K)

21666

318.00

02/11/20 02/11/20 684. 72 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1198 BRANDYWINE VALLEY SPCA 61084 1 01410 5400 S.P.C.A. CONTRACT 3517 JANUARY 2020 STRAY PICK-UP/ACTIVITY

684.72

02/11/20 02/11/20 2,134.28 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

4226 CHESTER CNTY CONSERVATION DISTRICT CLEAN 61190 1 01454 3707 BOW TREE POND 1 021120 BOW TREE POND NPDES PERMIT

2,134.28

02/11/20 02/11/20 1,500.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

263 CHESTER COUNTY CONSERVATION DISTRICT 61189 1 01454 3707 BOW TREE POND 1 021120 BOW TREE POND PERMIT

1,500.00

02/11/20 02/11/20 2,250.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

242 CHESTER COUNTY TREASURER 61085 1 01403 2200 R.E. TAX COLLECT - MISC EXPENSE DATA FILE ASSMT. - 2020

DCIS20200018 02/11/20

2,250.00

02/11/20 361.83 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

361.83

3488 CINTAS CORPORATION #287 61086 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 4040634803 02/11/20 02/11/20 70. 92 WEEK END 1/22/20 CLEllN MATS 61086 2 01487 1910 UNIFORMS 4040634803 02/11/20 02/11/20 547. 56 WEEK END 1/22/20 CLEllN UNIFORMS 61087 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 4040073577 02/11/20 02/11/20 70.92 WEEK END 1/15/20 CLEllN MATS 61087 2 01487 1910 UNIFORMS 4040073577 02/11/20 02/11/20 547.56 WEEK END 1/15/20 CLEllN UNIFORMS 61088 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 4041882700 02/11/20 02/11/20 70. 92 WEEK END 2/05/20 CLEllN MATS

2

.ast Gos/en Township Fund Accounting

Report Date 02/12/20

MI\RP05 run by BARBARA

Vendor Req # Budget# Sub#

9 22 AM

Description

BATCH 2 OF 5

Expenditures Register

GL-2002-72464

Invoice Number Req Date Check Dte Recpt Dte Check#

PAGE

Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

01 GENERAL FUND

3488 CINTAS CORPORATION #287 61088 2 01487 1910 UNIFORMS 4041882700 02/11/20 02/11/20 547.56 WEEK END 2/05/20 CLEAN UNIFORMS 61089 1 01409 3740 ffl. BLDG. - MAINT & REPAIRS 4041272448 02/11/20 02/11/20 70. 92 WEEK END 1/29/20 CLEAN MATS 61089 2 01487 1910 UNIFORMS 4041272448 02/11/20 02/11/20 547.56 WEEK END 1/29/20 CLEAN UNIFORMS ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

296 COMCAST 8499-10-109-0028306 61092 l 01401 3210 COMMUNICATION EXPENSE 0028306 FEBRUARY 2020 012220

2,473.92

02/11/20 02/11/20 128.40 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

317 CONTRACTOR'S CHOICE 61093 1 01430 2330 VEHICLE MAINT AND REPAIR ENGINE OIL & ELASTA START 61094 1 01409 3740 m. BLDG, - MAINT & REPAIRS AIR FILTER, REED VALVES, COMPRESSOR OIL & SHOP SUPPLIES

00244583 02/11/20

00244506 02/11/20

02/11/20

02/11/20

128.40

119.22

58.45 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

177.67

3613 DELAWARE VALLEY HEALTH TRUST 61095 1 01486 1560 HEALTH,ACCID, & LIFE 17927 02/11/20 02/11/20 55,240.00 FEBRUARY 2020 - MEDICAL & RX 61095 2 01213 1000 DENTAL INSURANCE W/H 17927 02/11/20 02/11/20 1,971.29 FEBRUARY 2020 - DENTAL ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3941 DISCOVERY BENEFITS INC, 61096 1 01487 1500 MISC. EMPLOYEE BENEFITS JANUARY 2020 - FSA

0001117904-IN 02/11/20

57,211.29

02/11/20 50.00

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

50.00

418 EAGLE POWER AND EQUIPMENT 61097 1 01430 2330 VEHICLE MAINT AND REPAIR P06054 02/11/20 02/11/20 125.00 BATTERY 700CC 61098 1 01430 2330 VEHICLE MAINT AND REPAIR P06152 02/11/20 02/11/20 151.18 FUEL & AIR FILTERS ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

276.18

3

,ast Gosqen Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 l\M

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# l\11\ount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2228 EAST GCSHEN TWP. - Tl\X COLLECTCR 61100 1 01409 4300 WIRELESS TOWER Tl\X PAYMENTS 020120 2020 CELL TOWER R/E Tl\X 02/11/20 02/11/20 265.41

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3752 EASTERN SALT COMPANY INC. 61099 1 01432 2460 SNOW - MATERIALS & SUPPLIES 192.45 TCNS ROCK SALT

4225 ENGINEERING NEWS-RECORD 61102 1 01401 3000 GENERAL EXPENSE 1 YEAR DIGITAL SUBSCRIPTION C.BOYLA

INV095744

021120

265.41

02/11/20 02/11/20 11,933.82

11,933.82

02/11/20 02/11/20 58.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

473 FASTSIGNS 61103 1 01401 2100 MATERIALS & SUPPLIES ENGRAVED PLATE - MIKE PAGNANELLI

368-61081

58.00

02/11/20 02/11/20 33.26 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

4136 FIRSTNET - #287290606505 61104 1 01401 3210 COMMUNICATION EXPENSE DECEMBER 2019 61104 2 01401 3210 COMMUNICATION EXPENSE JANUARY 2020

4137 FIRSTNET - #287290608802 61105 1 01401 3210 COMMUNICATION EXPENSE JANUARY 2020

2999 FITZPATRICK, CARAM.

505X02082020

505X02082020

802X02082020

61106 1 01414 3100 COURT REPORTERS 012420 ATTEND & TRANSCRIBE 12/17/19 MTG.­ ORDINANCE l\MENDMENT OF 1997

33.26

02/11/20 02/11/20 852. 90

02/11/20 02/11/20 927.08

1,779.98

02/11/20 02/11/20 636.87

636.87

02/11/20 02/11/20 100.00

100.00

4

+ast Gosqen Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1876 FOLEY INC, 61107 1 01430 2330 VEHICLE MAINT AND REPAIR PS200041745 02/11/20 02/11/20 300.00 TRANSPORT CHARGE - PARTS 61108 1 01432 3840 SNOW - EQUIPMENT RENTAL A6448403 02/11/20 02/11/20 5,261.00 WHEEL LOADER & BUCKET RENTAL 1 /7 2/4/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1970 GANNETT FLEMING INC. 61113 1 01408 3130 ENGINEERING SERVICES 060466.15*88610 02/11/20 MILLTOWN DAM ANNUAL INSPECT, 10/26- 11/22/19

5,561.00

02/11/20 3,300.00

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3000 GARNET FORD 61114 1 01430 2330 VEHICLE MAINT AND REPAIR REPAIR TRUCK #11 - FORD 2011 F-350

C81261

3,300.00

02/11/20 02/11/20 62 4, 83 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1849 HICKS BROTHERS LLC 61115 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 25 SMALL BALES STRAW 50478

624, 83

02/11/20 02/11/20 212.50

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2717 BIGGINS & SONS INC,, CHARLES A. 61116 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT MAINT, 2020 INSPECTIONS & REPORTS FOR ALL LIGHTS, FLASHERS & SCHOOL SIGNAL

51215

212.50

02/11/20 02/11/20 4,970.00

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2739 KEEPER OF THE STATIONERY 61117 1 01454 3000 GENERAL EXPENSE SHIPPING FEE FOR 4 5X8 NYLON FLAGS

013020

4,970.00

02/11/20 02/11/20 35,20

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

35.20

3838 KNIGHT BROS. INC, 61118 1 01438 2460 TREE REMOVAL 14513 02/11/20 02/11/20 1,920.00 TREE REMOVAL 12/20/19 ALLEY OFF CENTRAL 61118 2 01438 2460 TREE REMOVAL 14513 02/11/20 02/11/20 1,920.00 TREE REMOVAL 12/23 & ALLEY OFF CENTRAL & BROAD STREET 61118 3 01438 2460 TREE REMOVAL 14513 02/11/20 02/11/20 2,450.00 MISC.TREE SERVICE 12/24/19 LOG PICK

-UP VARIOUS STREETS

5

E,ast Gosh.en Township Fund Accounting

Report Date 02/12/20

Ml\RPOS run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Reg# Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

01 GENERAL FUND

3838 !INIGHT BROS, INC. 61118 4 01438 2460 TREE REMOVAL 14513 MISC.TREE SERVICE 12/26/19 STUMPS

-VARIOUS STREETS 61118 5 01438 2460 TREE REMOVAL MISC.TREE SERV, - ALLEY OF CENTRAL

7 39 !INOX EQUIPMENT RENTALS INC, 61119 1 01438 3840 EQUIPMENT RENTAL EXCAVATOR & HYDRAULIC BREAKER RENTL 1/13 - 1/14/20

2813 LAYFIELD, RUBY 61120 1 01452 3711 PILATES PILATE INSTRUCTION 1/8-1/29/20

2861 LITTLE INC., ROBERT E. 61121 1 01430 2330 VEHICLE MAINT AND REPAIR JDC STAND 61122 1 01430 2600 MINOR EQUIP, PURCHASE STIHL BG 50 - HAND HELD BLOWER 61123 1 01430 2330 VEHICLE MAINT AND REPAIR JW GUARD & CARBINER MULTI-TOOL

813 MAIN LINE CONCRETE 61124 1 01454 3740 EQUIPMENT MAINT. & REPAIR 3 YDS CONCRETE 4000 PSI 61125 1 01454 3740 EQUIPMENT MAINT. & REPAIR 4 GALS, ACRYL 60 - APPLEBROOK

864 METROPOLITAN COMMUNICATIO 61127 1 01437 2460 GENERAL EXPENSE - SHOP UNICATION GS PAGER 61128 1 01430 2330 VEHICLE MAINT AND REPAIR INSTALL 2 SIREN SWITCHES & SPEAKERS

14513

49813,1.3

012920

03-704772

03-702781

03-703911

456457

455165

IN000110239

IN000110240

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

2,120.00

2,590.00

11,000.00

772. 75

772. 75

273.70

273.70

207,36

111.96

420.58

739.90

564.00

102.00

666.00

645.00

1,185.00

1,830.00

6

+ast Gos,en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

01 GENERAL FUND

1641 NAPA AUTO PARTS 61129 1 01430 2330 VEHICLE MAINT AND REPAIR 6 GALS. HYD/OIL 61130 1 01430 2330 VEHICLE MAINT AND REPAIR 4 GALS. HYD/OIL 61131 1 01430 2330 VEHICLE MAINT AND REPAIR 2 5G R&O HYD OIL 61132 1 01430 2330 VEHICLE MAINT AND REPAIR OIL, AIR & HYD FILTERS 61133 1 01430 2330 VEHICLE MAINT AND REPAIR V-BELT 61134 1 01430 2330 VEHICLE MAINT AND REPAIR BULBS & BEAMS

354B OFFICE BASICS 61136 1 01401 2100 MATERIALS & SUPPLIES INDEX SHEETS, BINDERS & REPT,COVER SHEETS 61137 1 01401 2100 MATERIALS & SUPPLIES BINDER CLIPS, TABLE CLOTHES & REPT. COVERS 6113B 1 01401 2100 MATERIALS & SUPPLIES INK CARTRIDGES 61141 1 01401 2100 MATERIALS & SUPPLIES EXPANDING POCKETS, BINDER CLIPS & TABLETS 61142 1 01401 2100 MATERIALS & SUPPLIES TONER & LABELS

1554 OFFICE DEPOT 61139 1 01401 2100 MATERIALS & SUPPLIES LABELER TAPE 61140 1 01401 2100 MATERIALS & SUPPLIES STORAGE POUCHES

2B76 P T EQUIPMENT LLC. 61161 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS REPLACE BLOCK HEATER AT ADMIN,BLDG.

2-B04127 02/11/20 02/11/20 110.94

2-B0419B 02/11/20 02/11/20 73. 96

6-101704 02/11/20 02/11/20 97.90

2-B04060 02/11/20 02/11/20 116 .2B

2-B03707 02/11/20 02/11/20 46.70

2-B04174 02/11/20 02/11/20 25.00

470.7B

I-440339 02/11/20 02/11/20 63.17

I-1436320 02/11/20 02/11/20 31.37

1-14313B0 02/11/20 02/11/20 19B.72

429666561001 02/11/20 02/11/20 119.7B

432B92330001 02/11/20 02/11/20 749.51

1,162.55

411490B06001 02/11/20 02/11/20 B.39

429620306001 02/11/20 02/11/20 25.49

33.BB

EA40-23-SI-01 02/11/20 02/11/20 207.50

207.50

7

-ast Gos.en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2352 61144 1

61144 2

PECO - 99193-01400 01434 3610 STREET LIGHTING 99193-01400 12/26/19-1/28/20 01433 2470 UTILITIES - TRAFFIC LIGHTS 99193-01400 12/26/19-1/28/20

020320

020320

02/11/20

02/11/20

02/11/20

02/11/20

700. 40

600.73 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3153 PECO - 01360-05046 61147 l 01409 7505 BOOT & PAOLI LED SIGN 013120 01360-05046 12/30/19-1/30/20 BOOT RD.LED

1,301.13

02/11/20 02/11/20 44. 47 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1555 PECO - 45168-01609 61145 l 01409 3840 DISTRICT COURT EXPENSES 012820 45168-01609 12/18/19 - 1/27/20 GAS 61145 2 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 012820 45168-01609 12/18/19 - 1/27/20 ELEC

02/11/20

02/11/20

02/11/20

02/11/20

44.47

2,304.98

931.56 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2591 PECO - 59500-35010 61146 1 01454 3600 UTILITIES 012820 59500-35010 12/23/19-1/27/20 POND PUMP

3,236.54

02/11/20 02/11/20 36.10

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

36.10

1052 PENNON! ASSOCIATES INC. 61148 1 01408 3130 ENGINEERING SERVICES 1010901 02/11/20 02/11/20 10,205.75 SERVICES TBRU 12/29/19 SUNOCO NOISE 61149 1 01408 3131 ENGINEER.& MISC.RECHARGES 1010902 02/11/20 02/11/20 486.50 SERVICES THRU 12/29/19 SUNOCO E&S 61150 1 01454 3707 BOW TREE POND l 1010903 02/11/20 02/11/20 27,487.00 SERVICES THRU 12/29/19 BOW TREE #1 61151 1 01408 3131 ENGINEER.& MISC.RECHARGES 1010904 02/11/20 02/11/20 254.25 SERVICES TBRU 12/29/19 E.G.ELEM.SCH 61152 1 01408 3131 ENGINEER.& MISC.RECHARGES 1010905 02/11/20 02/11/20 1,196.50 SERVICES THRU 12/29/19 DUCKLINGS 1302 WILSON 61153 1 01413 3130 ENGINEERING SERVICES 1010906 02/11/20 02/11/20 95.25 SERV, THRU 12/29/19 1344 MORSTEIN 61154 1 01408 3130 ENGINEERING SERVICES 1010907 02/11/20 02/11/20 3,773.50 SERVICE TBRU 12/29/19 FOREST LANE 61155 1 01414 3131 537 PLAN-ENGINEERING 1010908 02/11/20 02/11/20 94.00 SERVICE THRU 12/29/19 227 ELLIS 61156 1 01414 3131 537 PLAN-ENGINEERING 1010909 02/11/20 02/11/20 1,331.75 SERVICE THRU 12/29/19 DIXON-LINE RD

8

+ast Gos,en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA

Vendor Reg# Budget# Sub#

9 22 AM

Description

1087 PIPE XPRESS INC, 61157 1 01432 2500 SNOW - MAINTENANCE & REPAIRS BANJO - MANIFOLD FLANGED COUPLING

1201 SAFETY SOLUTIONS INC. 61162 1 01437 2460 GENERAL EXPENSE - SHOP MEDICAL SUPPLIES - PW 61163 1 01409 2400 TWP, BLDG, - MATERIALS & SUPPLIES MEDICAL SUPPLIES - OFFICE/ADMIN 61164 1 01437 2460 GENERAL EXPENSE - SHOP MEDICAL SUPPLIES - SHOP

4172 SERVICEMASTER SERVICES 61165 1 01409 3740 TWP, BLDG, - MAINT & REPAIRS JANITORIAL SERVICE - TWP 61165 2 01409 3840 DISTRICT COURT EXPENSES JANITORIAL SERVICE - DIST.CT,

2108 SIDELINES SPORTSWEAR & PROMOTIONS

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Invoice Nwnber Reg Date Check Dte Recpt Dte Check# Amount

44,924, 50

103441 02/11/20 02/11/20 33.15

33.15

51509 02/11/20 02/11/20 597,90

51510 02/11/20 02/11/20 54.65

51511 02/11/20 02/11/20 94,40

746.95

2317 02/11/20 02/11/20 1,039.50

2317 02/11/20 02/11/20 310.50

1,350.00

61166 1 01487 1910 UNIFORMS 7079 02/11/20 02/11/20 128.80 FLEECE JACKET & JERSEYS - M.TRUITT

128,80

3120 STTC SERVICE TIRE TRUCK CTRS INC. 61167 1 01430 2330 VEHICLE MAINT AND REPAIR 535269-17 02/11/20 02/11/20 895.16 4 GOODYEAR TIRES - TRUCK #10 61168 1 01430 2330 VEHICLE MAINT AND REPAIR 546265-17 02/11/20 02/11/20 531. 90 CROP MAX TIRES - JOHN DEERE 61169 1 01430 2330 VEHICLE MAINT AND REPAIR 545100-17 02/11/20 02/11/20 1,551.80 4 GOODYEAR TIRES TRUCK #42 61170 1 01430 2330 VEHICLE MAINT AND REPAIR 543785-17 02/11/20 02/11/20 1,359.80 4 GOODYEAR TIRES TRUCK #41

4,338.66

9

9ast Gos:en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA

Vendor Req # Budget# Sub#

9 22 llM

Description

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1340 TINARI & SON, PHILIP 61171 1 01409 3745 PW BUILDING - MAINT REPAIRS CONCRETE FLOOR REPAIR

12025 02/11/20 02/11/20 2,040.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1423 VIMCO 61176 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS CHAPIN SPRAYER & L&M DRESS & SEAL

637287

2,040.00

02/11/20 02/11/20 181. 00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2815 iiOODCRAFT 537 61180 1 01437 2460 GENERAL EXPENSE - SHOP MISC. ITEMS & SHIPPING

267272

181. 00

02/11/20 02/11/20 95.98

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

550 XYLEM DEWl\TERING SOLUTIONS INC. 61181 1 01430 2330 VEHICLE MAINT AND REPAIR LIGHT WEIGHT HELIX HOSES

400981483

95.98

02/11/20 02/11/20 2,880.00

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2,880.00

1983 YALE ELECTRIC SUPPLY CO 61185 1 01409 3740 TWP, BLDG. - MAINT & REPAIRS Sll4900812. 001 02/11/20 02/11/20 294. 68 PHI 379024 ALTO 20 PACK 61186 1 01409 3740 TWP, BLDG. - MAINT & REPAIRS Sll4995037. 001 02/11/20 02/11/20 3. 41 BLINE STRAPS 61187 1 01409 3745 PW BUILDING - MAINT REPAIRS Sl14992479.001 02/11/20 02/11/20 213.30 PHI 236851 PLUS ALTO 25 PACK 61188 1 01433 2450 MATERIALS & SUPPLIES - SIGNS Sl14995176. 001 02/11/20 02/11/20 26.27 SUREWl\Y BATTERY ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

537.66

10

<ast Gosben Township Fund Accounting

Report Date 02/12/20

MI\RP05 run by BARBARA

Vendor Req # Budget# Sub#

9 22 AM

Description

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

05 SEWER OPERATING

l5l BLOSENSKI DISPOSAL CO, CHARLES 61081 l 05422 4502 R.C. SLUDGE-LAND CHESTER 176083 02/ll/20 02/ll/20 l8l. 00 SWITCH 20 YDS W/LINER l/20/20 61082 l 05422 4502 R.C. SLUDGE-LAND CHESTER l 76086 02/ll/20 02/ll/20 181.00 SWITCH 20 YDS W/LINER l/13/20 61083 l 05422 4502 R,C, SLUDGE-LAND CHESTER 176713 02/ll/20 02/ll/20 181.00 SWITCH 20 YDS W/LINER l/27/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

497 COLLIFLOWER INC. 61090 l 05420 3706 BARKWAY -MAINT,& REPR. HOSE ASSEMBLIES & MALE ELBOWS

01094880

543.00

02/ll/20 02/ll/20 913.06 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

293 COLONIAL ELECTRIC SUPPLY 61091 l 05420 3702 C.C. COLLEC.-MAINT,& REPR. DUCT SEALERS

13275956

913.06

02/ll/20 02/ll/20 14.90 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1747 EAST WHITELAND TOWNSHIP 6ll0l l 05429 4520 CONTR. SERV. MALVHRN INSTITUTE QTR.4 2019 SEWER PYMT.

012220

14.90

02/ll/20 02/ll/20 2,486.20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

813 MAIN LINE CONCRETE 61126 l 05420 3702 C.C. COLLEC.-MAINT.& REPR. 3 YDS 4000 PSI CONCRETE 456264 02/ll/20

2,486.20

02/ll/20 534.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

534.00

1087 PIPE XPRESS INC. 61158 l 05420 3702 C.C. COLLEC.-MAINT.& REPR. 103437 02/ll/20 02/ll/20 9.19 PVC TERMINAL ADAPTER & CONDUIT LOCK 61159 l 05420 3702 C.C. COLLEC.-MAINT.& REPR. 103491 02/ll/20 02/ll/20 140.04 ROLLS OF BUTYL SEALANT 61159 2 05422 3701 R.C. COLLEC.-MAINT.& REPR 103491 02/ll/20 02/ll/20 140.04 ROLLS OF BUTYL SEALANT ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

289.27

ll

'ast Gos(en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

2914

3529

TOWLER, SCOTT A. 61173 1 05422 4500 R.C. STP-CONTRACTED SERV. SERVICE RE: RCSTP DECEMBER 2019 61174 1 05422 4500 R.C. STP-CONTRACTED SERV. SERVICE RE: RCSTP JANUARY 2020

VERIZON - 442069312 MODEMS 61175 1 05420 3601 C.C. INTERCEPTOR-UTILITIES 12/26/19 - 1/25/20 MODEMS

1431 WEST GOSHEN TOWNSHIP

19-120131-1

20-013120-1

9847080505

61177 1 05420 3850 C.C. WEST GOSHEN OPER/MAINT 020220 QTR.4 2019 OPERATIONS & MAINTENANCE

1470 WESTTOWN TOWNSHIP 61178 1 05429 4500 CONTR. SERV. SUMMIT HOUSE QTR.l 2020 SEWER - SUMMIT 61179 1 05429 4510 CONTR. SERV. CIDER KNOLL QTR.l 2020 SEWER - CIDER

1983 YALE ELECTRIC SUPPLY CO

010920-S

010920 C

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

61182 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. Sll4914040.002 02/11/20 PVC FITTING & BLACK MASTER REEL 61183 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. Sll4914040.001 02/11/20 SLOTTED BOLES, BRACKETS, CIRCUIT BREAKERS, ADAPTERS & OTHER ELECTRIC SUPPLIES 61184 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. Sll4927943.001 02/11/20 CIRCUIT BREAKER & 3 CIRCUIT LOAD CENTER

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

02/11/20

14,764.45

16,617.28

31,381.73

100.40

100.40

132,099.10

132,099.10

87,330.00

19,680.00

107,010.00

8.78

205. 74

166.34

380.86

12

;ast Gosren Township Fund Accounting

Report Date 02/12/20

MARP0S run by Bl\RBARA

Vendor Req # Budget# Sub#

9 22 AM

Description

BATCH 2 OF 5

Expenditures Register

GL-2002-72464

Invoice Number Req Date Check Dte Recpt Dte Check#

PAGE

Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

06 REFUSE

4081 TOTAL RECYCLE INC. 61172 1 06427 4504 RECYCLING FEES JANUARY 2020 RECYCLING FEES

0000008809 02/11/20 02/11/20 2,905.52 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2,905.52

13

E.ast Gos8en Township Fund Accounting

Report Date 02/12/20

MARP05 run by BARBARA 9 22 AM

Expenditures Register

GL-2002-72464

BATCH 2 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

08 BOND FUNDS (CAPITAL PROJECTS)

4118 APPRAISAL REVIEW SPECIALISTS 61074 1 08459 6000 MISC TRAIL EXPENSES PAOLI PK.TRAIL SEG.A - PARCEL 2 & 3

4-A

02/11/20 02/11/20 2,800.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1970 GANNETT FLEMING INC. 61109 1 08454 6050 HERSHEY'S MILL ENGINEERING 060466.05*88605 02/11/20 SERVICE 8/4-12/27/19 H.M.DAM - FULL BREACH 61110 1 08454 6010 MILLTOWN DAM ENGINEERING 060466.06*88607 02/11/20 SERVICE 8/3-12/27/19 MILLTOWN DAM - HAZARD REDUCTION 61111 1 08454 6010 MILLTOWN DAM ENGINEERING 060466.11*88608 02/11/20 SERVICE 8/3-12/27/19 MILLTOWN DAM - RESERVOIR ENHANCEMENTS 61112 1 08454 6050 HERSHEY'S MILL ENGINEERING 060466.12*88609 02/11/20 SERVICE 8/3-12/27/19 H.M DAM RESERV ENHANCEMENTS

2,800.00

02/11/20 7,000.00

02/11/20 6,920.00

02/11/20 18,490.00

02/11/20 23,314.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

55,724.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

FUND SUMMARY

Fund Bank Account Amount Description ------- ------------ -------------- -----------------------------------

01 01 05 05 06 06 08 08

189,116.16 GENERAL FUND 275,752.52 SEWER OPERATING 2,905.52 REFUSE 58,524.00 BOND FUNDS (CAPITAL PROJECTS)

526,298.20

PERIOD SUMMARY

Period Amount

2002 526,298.20

526,298.20

526,298.20 0 Printed, totaling 526,298.20

14

East Goshen Township Fund Accounting

Report Date 02/13/20 ProcureR"ent Card Entries PAGE

Per Budget I Sub# Description Vendr Vendor Name

2002 CREDIT CARD PAYMENT 05420 3702 PORTABLE TOILETS - MORSTEIN & 3140 ACE PORTABLES INC. 05422 4500 LAB TESTNG RCSTP 12/24/19 - 1/14/20 2918 ALS ENVIRONMENTAL 06427 4502 IIEEK 1/23/20 - 1/31/20 241 C.C. SOLID WASTE AUTHORITY 05422 4502 IIEEK 1/23/20 - 1/31/20 241 C,C, SOLID WASTE AUTHORITY 01430 2320 462,1 GALS. DIESEL 1161 REILLY & SONS INC 01430 2320 94.40 GALS, GASOLINE 1161 REILLY & SONS INC 01430 2320 452.8 GALS. DIESEL 1161 REILLY & SONS INC 01401 3210 1/28/20 - 2/27/20 2829 VERIZON - TWP.FIOS 0001-14 05422 3601 1/28/20 - 2/27/20 2773 VERIZON - PW FIOS 0001-15

GENERAL LEDGER SlOOIARY

GL Account I

014XX-XXXX 01107-1010 054XX-XXXX 05100-1005 064XX-XXXX 06100-1005

Debit Credit Description

2,107, 78 GENERAL FUND Expense Account 2,107.78 GENERAL FONO Bank Account 1,299.46 SERER OPERATING Expense Account 1,299.46 SERER OPERATING Bank Account 6,030.19 REFO'SE Expense Account 6,030. lS REFUSE Bank Account

BATCH 3 OF 5

Invoice# Inv Date Credit Srce Trx # # U

158806 01/21/20 160. 00 PC 72478 1 y 40-2384478 01/21 /20 432.00 PC 72478 2 y 56194-R 01/31/20 6,030.19 PC 72478 3 y 56194-S 01/31/20 595.47 PC 72478 4 y 119896-531 01/29/20 932. 52 PC 72478 5 y 119368-530 01/22/20 178.23 PC 72478 6 y 180530-53! 02/05/20 887.04 PC 72478 7 y 5521634-12720 01/21/20 109. 99 PC 72478 8 y 7528031-12720 01/21/20 111.99 PC 72478 9 y

9,437.43

East Goshen Township Fund Accounting

Report Date 02/13/20

MARP05 run by BIIBBARA 1 18 PM

Expenditures Register

GL-2002-72500

BATCH 4 OF 5

PAGE

Vendor Req # Budget# subn Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

01 GENERAL FUND

197 BUCKLEY BRION MCGUIRE & MORRIS 61204 1 01404 3140 LEGAL - ADMIN 21675 02/13/20 02/13/20 1,151.50 LEGAL SERVICE 1/03 - 1/30/20 61204 2 01413 3140 LEGAL - TWP CODE 21675 02/13/20 02/13/20 20.00 LEGAL SERVICE 1/03 - 1/30/20 61204 3 01414 3110 LEGAL - CODES 21675 02/13/20 02/13/20 986.85 LEGAL SERVICE 1/03 - 1/30/20 61204 4 01414 3141 LEGAL - ZONING HEAAING BOAAD 21675 02/13/20 02/13/20 134.00 LEGAL SERVICE 1/03 - 1/30/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3490 COMCAST 8499-10-109-0111284 61205 1 01401 3210 COMMUNICATION EXPENSE 020420 0111284 2/9-3/8/20 PW SPEC.VIDEO

2,292.35

02/13/20 02/13/20 34.?? ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3941 DISCOVERY BENEFITS INC. 61206 1 01487 1500 MISC. EMPLOYEE BENEFITS FSA - NOVEMBER 2019

0001092618-IN 02/13/20

34.??

02/13/20 50.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

50.00

1876 FOLEY INC. 61207 1 01430 2330 VEHICLE MAINT l\ND REPAIR W0200130684 02/13/20 02/13/20 594.09 REPAIR TIRE - NAIL IN TIRE 61208 1 01432 3840 SNOW - EQUIPMENT RENTAL A6448402 02/13/20 02/13/20 5,261.00 WHEEL LOADER & BUCKET RENTAL -

12/10/19 - 1/7/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

633 HODGSON'S AUTOMOTIVE INC. 61211 1 01430 2330 VEHICLE MAINT l\ND REPAIR EMISSIONS INSPECT.-2012 FORD ESCAPE 61212 1 01430 2330 VEHICLE MAINT l\ND REPAIR EMISSIONS INSPECT.-2019 FORD EXP.

84984 02/13/20

85027 02/13/20

02/13/20

02/13/20

5,855.09

32. 47

32.47

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

739 KNOX EQUIPMENT RENTALS INC. 61213 1 01438 3840 EQUIPMENT RENTAL STONE BUGGY RENTAL 1/20-1/22/20

50092 .1. 2

64. 94

02/13/20 02/13/20 176.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

176. 00

1

East Goshen Township Fund Accounting

Report Date 02/13/20

MARP05 run by BARBARA 1 18 PM

Expenditures Register

GL-2002-72500

BATCH 4 OF 5

PAGE

Vendor Reg# Budget# Sub# Description Invoice Number Reg Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2876 P T EQUIPMENT LLC. 61217 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS ANNUAL SERVICE AGREEMENT 2020 61217 2 01409 3745 PW BUILDING - MAINT REPAIRS ANNUAL SERVICE AGREEMENT 2020

012820

012820

02/13/20

02/13/20

02/13/20

02/13/20

936.00

936.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1032 PECO - 99193-01302 61220 1 01409 3600 TWP, BLDG. - FUEL, LIGHT, WATER 99193-01302 12/26/19 - 1/28/20 61220 2 01454 3600 UTILITIES 99193-01302 12/26/19 - 1/28/20

020720

020720

02/13/20

02/13/20

02/13/20

02/13/20

1,872.00

4,013.10

320.46 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1783 STATE WOR!IERS INSURANCE FUND 61224 1 01411 6000 VOLUNTEER FIREFIGHTER WOR!IERS COMP 013120 INSTALLMT, 3 OF 11 POL.#05918452

02/13/20

4,333.56

02/13/20 3,082.00

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2933 TRANS-FLEET CONCRETE 61225 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 20 CYDS. OFFSEASON 4000 CONCRETE 166227

3,082.00

02/13/20 02/13/20 1,968.00

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1,968.00

1470 WESTTOWN TOWNSHIP 61226 1 01410 5310 REGIONAL POLICE BLDG INTEREST 021320 02/13/20 02/13/20 837.29 FEBRUARY 2020 - INTEREST 61226 2 01410 5320 REGIONAL POLICE BLDG PRINCIPAL 021320 02/13/20 02/13/20 9,583.33 FEBRUARY 2020 - PRINCIPAL ------ --------- ------- ---- ----------------------------- --------------- -------- --------- --------- ------ ------------

10, 420. 62

2

East Goshen Township Fund Accounting

Report Date 02/13/20

MARP05 run by BARBARA 1 18 PM

Expenditures Register

GL-2002-72500

BATCH 4 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

03 SINKING FUND

1876 FOLEY INC, 61209 1 03430 7400 CAPITAL REPLACEMENT - HWY EQUIP CATERPILLAR - MCDEL 272D3XEHF

M3800201 02/13/20 02/13/20 69,000.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3551 MCMAHON ASSOCIATES INC, 61216 1 03460 7406 PAOLI PK.TRAIL - SEGMT.F 169501 PROF.SERVICE 11/30-12/31/19 PAOLI PIKE TRAIL SEGMENTS F & G

69,000.00

02/13/20 02/13/20 1,170.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

4140 REISINGER INC., DONALD E, 61221 1 03409 7400 CAPITAL REPLACEMENT-TWP BLDG APPLIC. 3 - VESTIBULE MCDIFICATION

APP.#3

1,170.00

02/13/20 02/13/20 5,033.61 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1212 SAYRE INC,, G.L. 61222 1 03430 7400 CAPITAL REPLACEMENT - HWY EQUIP 2021 PETERBILT CAB & CHASSIS #49 61223 1 03430 7400 CAPITAL REPLACEMENT - HWY EQUIP 2021 PETERBILT CAB & CHASSIS #48

08294 02/13/20 02/13/20

08295 02/13/20 02/13/20

5,033.61

102,826.00

102,826.00

205,652.00

3

East Goshen Township Fund Accounting

Report Date 02/13/20

MARP05 run by BARBARA 1 18 PM

Expenditures Register

GL-2002-72500

BATCH 4 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

05 SEWER OPERATING

40 ALLIED CONTROL SERVICES 61201 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. REMOTE LOGGER INSTALLATIONS 61201 2 05420 3704 C.C. COLLECT.-MAINT & REP - I&I REMOTE LOGGER INSTALLATIONS

313998

313998

02/13/20

02/13/20

02/13/20

02/13/20

352.00

352.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

197 BUCKLEY BRION MCGUIRE & MORRIS 61203 1 05429 3140 ADMIN - LEGAL LEGAL SERVICE 1/15 - 1/30/20

21676

704.00

02/13/20 02/13/20 183.55 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

563 GRAINGER 61210 1 05422 3700 R.C. STP-MAINT.& REPAIRS SOLENOID VALVE FOR SLUDGE ROOM

9419607628

183.55

02/13/20 02/13/20 1,790.20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

598 HANSON AGGREGATES PENNSYLVANIA LLC 61214 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 3668596 55.54 TONS 1/4" STONE

1,790.20

02/13/20 02/13/20 1,124.69

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1,124.69

2876 P T EQUIPMENT LLC. 61217 3 05422 3700 R.C. STP-MAINT.& REPAIRS 012820 02/13/20 02/13/20 936.00 ANNUAL SERVICE AGREEMENT 2020 61217 4 05422 3701 R.C. COLLEC.-MAINT.& REPR 012820 02/13/20 02/13/20 936.00 ANNUAL SERVICE AGREEMENT 2020 61217 5 05420 3702 C.C. COLLEC.-MAINT.& REPR. 012820 02/13/20 02/13/20 936.00 ANNUAL SERVICE AGREEMENT 2020 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2827 PECO - 04725-43025 61218 1 05420 3603 ASHBRIDGE - UTILITIES 020520 04725-43025 1/3-2/4/20 WYLPN PUMP

2,808.00

02/13/20 02/13/20 724. 92 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

724. 92

1031 PECO - 99193-01204 61219 1 05420 3602 C.C. COLLECTION -UTILITIES 020720 02/13/20 02/13/20 529.82 99193-01204 12/26/19 - 1/31/20 61219 2 05420 3604 MILL VAL./BARKWAY UTILITIES 020720 02/13/20 02/13/20 421. 47 99193-01204 12/26/19 - 1/31/20 61219 3 05420 3600 C.C. METERS - UTILITIES 020720 02/13/20 02/13/20 10.28 99193-01204 12/26/19 - 1/31/20

4

East Goshen Township Fund Accounting

Report Date 02/13/20

MIIRP05 run by BARBARA

Vendor Req # Budget# Sub#

1 18 PM

Description

Expenditures Register

GL-2002-72500

BATCH 4 OF 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

05 SEWER OPERATING

1031 PECO - 99193-01204 61219 4 05422 3601 R,C, COLLEC.-UTILITIES 99193-01204 12/26/19 - 1/31/20 61219 5 05422 3600 R.C STP -UTILITIES 99193-01204 12/26/19 - 1/31/20

020720

020720

02/13/20

02/13/20

02/13/20

02/13/20

369.59

9,857.71 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

11,188.87

5

East Goshen Township Fund Accounting

Report Date 02/13/20

MARP05 run by BARBARA

Vendor Req # Budget# Sub#

1 18 PM

Description

BATCH 4 OF 5

Expenditures Register

GL-2002-72500

Invoice Number Req Date Check Dte Recpt Dte Check#

PAGE

Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

06 REFUSE

197 BUCKLEY BRION MCGUIRE & MORRIS 61203 2 06427 3140 LEGAI SERVICES LEGAI SERVICE 1/15 - 1/30/20

21676 02/13/20 02/13/20 183.55

6

East Goshen Township Fund Accounting

Report Date 02/13/20

MARP05 run by BARBARA 1 18 PM

Expenditures Register

GL-2002-72500

BATCH 4 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

08 BOND FUNDS (CAPITAL PROJECTS)

197 BUCKLEY BRION MCGUIRE & MORRIS

3551

61202 1 08459 6000 MISC TRAIL EXPENSES LEGAL SERVICE 1/7-1/23/20 PAOLI PK TRAIL

MCMl\HON ASSOCIATES INC,

21682

61215 1 08459 6001 SEGMENTS A&B ENGINEERING 169491 PROF.SERVICE 11/30-12/31/19 PAOLI PIKE TRAIL SEGMENTS A & B

FUND SUMMARY

Fund Bank Account Amount Description

01 01 03 03 05 05 06 06 08 08

30,149.33 GENERAL FUND 280,855.61 SINKING FUND 18,524.23 SEWER OPERATING 183.55 REFUSE 11,785.00 BOND FUNDS (CAPITAL PROJECTS)

341,497.72

PERIOD SUMMARY

Period Amount

2002 341,497.72

341,497.72

02/13/20

02/13/20

02/13/20 120.00

303.55

02/13/20 11,665.00

11,665.00

341,497.72 0 Printed, totaling 341,497.72

7

East Goshen !ownship Fund Accounting BATCH 5 OF 5

Report Date 02/13/20 Procurerrent Card Entries PAGE

Per Budget# Sub# Description Vendr Vendor Harre Invoice# Inv Date Credit Srce !rx # # U

NNNN NNNNNNNN NNNN NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN NNNNN NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN NNNNNNNNNNNNNNN NNNNNNNN NNNNNNNNNNNN NNNN NNNNN NNN N 2002 CREDIT CARD PAYMENT 06427 4500 RESIDENTIAi PICK-UP FEBRUARY 2020 2762 AJB A,J, BLOSENSKI INC, 01430 2330 TARP STRAPS 2442 KENT AUTOMOTIVE 02100656 9307324665 02/01/20 01/22/20 57,910.03 PC 72499 600. 04 PC 72499 2

NNNN NNNNNNNN NNNN NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN NNNNN NNNNNNNMNNNNNNNNNNNNNNNNNNNNNNNNNNNMNNNN NNNNNNNNNNNNNNN NNNNNNNN NNNNNNNNNNNN MMMM NNNNN MMM N

GENERAi LEDGER SUMMARY

GL Account #

014XX-XXXX 01107-1010 064XX-XXXX 06100-1005

Debit

600. 04

57,910.03

Credit Description

GENERAi FUND Expense Account 600.04 GENERAi FUND Bank Account REFUSE Expense Account 57,910.03 REFUSE Bank Account

58,510.07

58,510.07

Memo

To: Board of Supervisors From: Park and Recreation Commission Re: Community Day Activities Date: February 14, 2020

Community Day has been scheduled for Saturday, June 27th with a rain date of Sunday, June 28th. Per Township procurement standards; the Director of Parks and Recreation has received the following price quotes to be reviewed by the Park and Recreation Commission. Quotes were for the exact type, quality and quantity of service. It is important to note, the Friends of East Goshen 501c3 anticipates financially supporting the event in its entirety.

Name Service Provided Service Fee D & M Fireworks Fireworks Demonstration $12000 Skyshooter Displays Fireworks Demonstration $8500 International Fireworks Demonstration $8750 Bixler Pyrotechnics Fireworks Demonstration $8450

Name Service Provided Service Fee One Stop Party Shop - Inflatables and Carnival Games $3667.75 Circus Time Inflatables and Carnival Games $6560 Bette's Bounces - Inflatables and Carnival Games $3832.80 Inflatables and Carnival Games $2695* *Does not include: trackless train plus staff, mini-striker, high striker ($995)

After reviewing the above price quotes, the Park Commission recommends selecting Bixler Pyrotechnics

Fireworks and One Stop Party Shop for Community Day.

Bixler Pyrotechnics is the fireworks recommendation because:

• Price quote is the lowest. • Bixler Pyrotechnics comes highly recommended from other special event organizers in the parks and recreation community and have done impressive shows with a fully computer controlled firing system. This firing system improves timing of shells and increases on site safety.

One Stop Party Shop is the inflatables recommendation because:

• Price quote is the lowest • Customer service (determined at events) has been among the best for the above vendors. • One Stop Party Shop will provide staff for the trackless train and gas; additional Township cost savings

Motion: I move to select Bixler Pyrotechnics and One Stop Party Shop for the above listed Community Day services.

Computer/H:/East Goshen Township/Budget

Rick Smith

From: Sent: To: Cc: Subject: Attachments:

Patricia Rooney <patroon3@gmail.com> Thursday, February 6, 2020 2:19 PM Rick Smith; MShane@eastgoshen.org Carole Rubley

Fair Districts PA Resolution Request FDPA About Us 200126.pdf; FDPA-Research-Highlights-2019-Survey-of-PA-Sentiment­ on-Legislative-Redistricting-Home-Print-Version.pdf; Two Bills Summary 200130.pdf; SelectionProcess 190610 (2).pdf; FAQ Handout 190214 (2).pdf; Resolutions List 2020-01-29.pdf; Resolution East Goshen Twp Feb2020.Word.docx

Manager Smith and Chairman Shane,

Several residents of East Goshen would like the East Goshen Township Board of Supervisors to sign a resolution in support of redistricting reform and therefore would like to make that request in the public comment section of the regularly-scheduled meeting BoS meeting Feb 18. Many nearby townships and boros have already come out in support of fair districting and the Chester County commissioners have also passed this resolution. Representative Comitta cosponsors House bills 22/23 that Fair Districts PA endorses, and Senator Killion is the lead sponsor of Senate bills matching the House bills, SB 1022/1023.

By signing a resolution in support of an independent redistricting commission at this time East Goshen Township performs an important duty of education of township residents of this critical discussion about PA's legislative and congressional districting, and it also helps townships still struggling with this issue understand that it is indeed the place of local townships and boroughs to weigh in on issues that so clearly affect residents and the municipality's own ability to govern well.

Below please find several documents that offer detailed information about the redistricting reform supported by Fair Districts PA. You will note Fair Districts PA does not insist you endorse specific legislation, just that you consider past mapping practices and acknowledge we can and must improve upon those methods by creating an independent redistricting commission to draw district lines in a nonpartisan transparent manner open to scrutiny. To date, 354 governing bodies including 22 county commissions have declared support for fair districting practices through this resolution. Below please also find a list of the actual townships and municipalities who support change.

Please also find attached some information about Fair Districts PA, a nonpartisan nonprofit project of the League of Women Voters and composed entirely of concerned volunteers within Pennsylvania. Attached also find the resolution template that other municipalities and townships have used for this initiative. Much more information can be found on our website, and through the links at the bottom of the website's landing page.

Thank you for acknowledging democracy-in-action,

1

Patricia Rooney Volunteer, Fair Districts PA

P.O.Box 193 Honey Brook, PA 19344 patroon3@gmail.com

617-347-3946 ( cell)

2

, ,

Two Bills/One Commission

Summary of Bills

House Bill 23 (HB 23) & Senate Bill 1023 (SB 1023) Will create an independent citizens commission to draw federal congressional districts.

Does not require a constitutional amendment. ...

NIIIHONTIOUOOS c11msuous ...., •

11 registered voters 4 Republicans, 4 Democrats, 3 unaffiliated or third-party voters

Diversity required Reflect Pennsylvania's racial, geographic and gender diversity

Voting Rights Act

Maps must comply with this federal law

Compact and contiguous districts

0

0- 0- 0 6-

No cracking! A county may not contain more districts than the number required by population plus one. Written explanations required for exceptions

No politicians or lobbyists No partisan favoring for anyone!

Transparency

Including public input before and after the maps are drawn

Failsafe: Elimination voting If commission deadlocks, elimination voting is used to resolve it

Commissioners vote to rank the maps. The map receiving the lowest rank is dropped following each round of voting until one map remains

House Bill 22 (HB 22} & Senate Bill 1022 (SB 1022) Will define how to draw state legislative districts.

Requires a constitutional amendment. That means HB 22/SB 1022 must pass two consecutive sessions of the General Assembly and then be approved by voters in May 2027.

• Same commission as created by HB 23/SB 1023

• Same safeguards as HB 23/SB 1023

• Same failsafe in the event of a deadlock

• Different approval timeline

2019 2020 2021 After referendum passes, commission begins work on

HB 22&23 SB 1022 & 1023 Introduced. Introduced. HB 22/SB 1022 passed by both chambers - early summer.

, HB 23/SB 1023 passed by both chambers ... -.. ... , , - early summer - and signed , ,-'t·'

into law by Governor. _,

COMMISSION CREATED!

Introduce & pass HB 22/SB 1022 (second time).

Commission holds public hearings and begins work D on federal congressional MIY 21 Pllmarv districts. rellrenaum vo11 May 21 - referendum passes

state districts.

Jan2a2020

1ia11■ifAIRftA ll•■■l DISTRICTS r ····-.,,.,

f PA Sentiment on Legislative Redistricting

2019 Survey o I"'\

THE BACKGROUND

First-of-its-kind information reveals the attitudes behind Pennsylvania voters' overwhelming support for redistricting reform. Pennsylvania voters are clear that the current redistricting process is designed to maximize party influence, minimize accountability and reduce competition. Sixty-seven percent (67%) of voters support an independent commission to draw state and federal districts, including majorities of Democrats (66%), Independents

(78%), and Republicans (63%) along with support across all demographic groups and the state's diverse geographic regions.

Today, congressional and state legislative voting districts are redrawn every 10 years following the census and based on changes to the state's population. In the current process, state legislative districts are drawn by four state legislators and a fifth commissioner chosen by those four, or, if they can't agree, by a majority of the PA Supreme Court. Congressional districts are passed as a bill by the General Assembly and approved or vetoed by the governor.

THE SURVEY

In September 2019, the Center for Opinion Research at Franklin & Marshall College conducted a statewide survey* of registered voters on the topic of government reform, with an emphasis on redistricting reform. The survey was sponsored by the League of Women Voters of Pennsylvania Citizens Education Fund and Fair Districts PA (FDPA), a nonpartisan, statewide coalition of volunteers from all walks of life and political stripes. FDPA seeks a redistricting process that is transparent, impartial and fair - one that benefits all PA citizens. This summary provides an overview of the key findings from the research.

*Methodology: The survey was designed and administered by staff at the Center for Opinion Research at Franklin & Marshall College. 901 phone interviews were conducted from August 20 to September 10, 2019. The research was sponsored by Fair Districts PA and the League of Women Voters of Pennsylvania Citizens Education Fund. The full report, along with more detailed methodology, is available at FairDistrictsPA.com.

6 7% of Pennsylvania-registered voters support an independent commission to draw state legislative districts.

REDISTRICTING PREFERENCES, PA-REGISTERED VOTERS State legislative districts are currently re-drawn every 10 years based on changes to the state's population. New legislative districts are re-drawn by state legislators and the state supreme court. Do you think state legislative districts should be created by an independent commission or do you think these districts should continue to be drawn by state legislators?

Neither 2%_

Both 3%-

Do Not l<now

State Legislators

Independent Commission

A call for change cuts across geographic regions and party lines including majorities of Democrats (66%), Independents (78%), and Republicans (63%).

REDISTRICTING PREFERENCES, PA-REGISTERED VOTERS Do you think state legislative districts should be created by an independent commission or do you think these districts should continue to be drawn by state legislators?

Independent State Legislative Both Neither Do Not l<now Commission Leaders PARTY Republican 63% 19% 7% 3% 8%

Democrat 66% 14% 12% 2% 6%

Independent or something else 78% 7% 6% 4% 6%

REGION Philadelphia 69% 14% 11% 3% 4%

Northeast 65% 13% 8% 3% 11%

Allegheny 70% 19% 5% 3% 3%

Southwest 57% 18% 18% 3% 5%

Northwest 59% 22% 7% 0% 13%

Central 71% 12% 10% 4% 4%

Southeast 68% 15% 7% 2% 8%

Read the full report and learn more about our work to support redistricting reform at FairDistrictsPA.com.

Voters overwhelmingly support redistricting reform because the current system puts party interests ahead of voter interests, creates gridlock and polarization, and ultimately allows officials to choose their own voters instead of voters choosing their elected officials.

FEELINGS ABOUT REDISTRICTING OUTCOMES, PA-REGISTERED VOTERS Do you agree or disagree with each of the following statements about the current system of drawing legislative districts in Pennsylvania?

The current system of drawing legislative districts in Pennsylvania ...

Allows party leaders to put party interests ahead of voters' interests

Creates polarizations and gridlock

Allows elected officials to choose their own voters

instead of voters choosing their elected officials

Gives voters less choice on Election Day

Prevents voters from holding their representatives accountable

Works because legislators know their districts

Works fine as is and should be left alone

38%

18%

59% of voters would be more likely to vote for a legislator who supports use of an independent commission for redistricting.

VOTE Much more likely

Would you be more likely or less likely Somewhat more likely to vote for a state legislator who supports the use of an independent commission Somewhat less likely to draw legislative districts in the state or Much less likely wouldn't it make much difference in how you voted? Is that much [more/ less] likely Would not make a difference or somewhat [more/ less] likely?

Do not know

72%

70%

65%

62%

61%

30%

29%

3%

3%

29%

5%

Source: Survey conducted August 20 -September 10, 2019

Read the full report and learn more about our work to support redistricting reform at FairDistrictsPA.com.

The survey reinforces that the CALL FOR CHANGE CUTS ACROSS PARTY LINES AND

GEOGRAPHIC REGIONS. -- Not red, not blue, just fair. --

Visit FairDistrictsPA.com today to learn more. Find out how you can support redistricting reform

that includes an independent commission.

FAIR 226 Forster Street FAIR DISTRICTS PA 1s A PROJECT OF

DISTRICTS Harrisburg, PA 17102 J 1 EAGUE OF WOMEN VOTERS'

•••••► PA (BOO) 313_1597 L . or PENNSYLVANIA I!J!!K

Independent Citizens Redistricting Commission Selection Process

l. Voters Apply

Open application is available to all registered voters

2. Collect & Verify

Secretary of Commonwealth (SoC) verifies each that

applicant meets the qualifications

3. Pools of Qualified Applicants

SoC separates qualified applicants into three

pools: Republican, Democrat, and unaffiliated or

third party voters

4. Applicants Randomly Selected

SoC selects 120 applicants, 40 from each pool, using a

weighted selection process to ensure racial, gender, and

demographic diversity

5. Strikes by Each Party

Republican and Democratic party leaders can each

remove up to two applicants from each pool

(no more than six total)

6. Final Random Selection SoC randomly selects from pools: 4 Republicans, 4 Democrats, 3 unaffiliated or third party commissioners

eee

40:40:40

f ·····lf::.;;_1 \( .. ··'<r··· .. ii' [=W/

\, .. \:._. ________ ',/ \ .. ................ . eee

Independent Citizens Redistricting Commission Who Can Serve?

Commission Members • 11 registered voters: 4 Republicans, 4 Democrats, 3 three unaffiliated or third party voters

• No politicians or lobbyists • Reflect Pennsylvania's racial, geographic and gender diversity

Qualifications

• Same political affiliation for three years • Voted in two of the last three elections • No insider connections • No federal or state job or elected office for five years • No lobbying for five years • Not a candidate for election for five years • No political party, committee or PAC job for five years

Restrictions

While serving and for at least three years after, commissioners can't:

• Be paid staff or consultant to Congress or the General Assembly • Be appointed to a paid or unpaid position by the Governor • Register as a federal or state lobbyist • Be paid by a political party, committee or PAC

While serving and for at least five years after, commissioners and spouses can't:

• Hold federal or state office (appointed or elected) • Be nominated as a candidate for elected office • Be an officer of a political party, committee or PAC

0

0

••••••FAIRftA f!II! DISTRICTS r

Working to Ensure FAIR DISTRICTS & FAIR ELECTIONS

Pennsylvania Redistricting Reform: House Bills 22 and 23

Frequently Asked Questions

Ql. Do voters care enough to make redistricting reform an election issue?

Al. Many do care, and they're paying attention to the details. In a Franklin & Marshall College survey in March 2018, two-thirds of voters (67 percent) said they were aware of the state Supreme

Court ordering a new map of congressional districts, and of those who were aware, 9 out of 10 said they believed the old map had been drawn unfairly. That included a majority (52 percent) of registered Republicans.

Q2. Why should the General Assembly pass House Bills 22 and 23 rather than any of the other redistricting reform bills?

AZ. HB 22 and HB 23 are similar in many ways to HB 722 from the 2017-18 session of the General Assembly. The bills were drafted after talks between supportive lawmakers and various civic groups interested in meaningful reform, with input from election reform analysts and citizens involved in successful reform efforts in other states. The bills include these key reforms:

1. Creation of an independent redistricting commission for both congressional and state legislative redistricting, with members to be chosen at random from lists of citizen-applicants meeting criteria to be set by the Legislature;

2.

A prohibition against commission service by lobbyists, government officials or their family members;

3. A transparent redistricting process, encouraging public input; and

4. Strict criteria for drawing district boundaries and prohibitions against maps designed to protect incumbents or to unfairly discriminate against individuals or groups.

Q3. Why is it necessary to enact two bills to reform the redistricting process?

A3. Changing the redistricting process for state House and Senate districts requires changing the state constitution, a process which requires the Legislature to pass a constitutional amendment (HB 22) in two consecutive two-year sessions followed by a voter referendum. The earliest that could occur would be at the Primary Election in May of 2021. However, changing the process for redistricting of congressional districts does not require a constitutional amendment and can be accomplished during the 2019-20 session of the General Assembly. HB 23 provides a vehicle to do that. Once HB 23 is enacted into law, an independent redistricting commission will be formed and begin taking steps necessary to be ready for redistricting after the 2020 federal census is completed. By the time HB 22 is

226 Forster St, Harrisburg, PA 17702 I info@FairDistrictsPA.com I (800) 313-1597

approved by the voters at the May 2021 Primary, the new commission will already be in place and ready to handle both congressional and state legislative redistricting.

Q4. Gerrymandering has been around a long time. Why are we just hearing about this now?

A4. Gerrymandering has been part of the political process for centuries, but by any measure it has become far worse in recent decades. New mapping and data-mining technologies allow mappers to predict district outcomes with great precision in a way that increasingly deprives voters of choice. While squiggly lines are not the problem, districts that unnecessarily divide counties and townships or wrap around each other in odd ways are clear indicators of partisan intent. Voters believe these districts undermine accountability and protect unresponsive incumbents. While some reform organizations have been working on this since the 1990s, many more citizens are just now becoming aware of the need for reform before the 2020 census.

QS. Relative to other states, just how badly is Pennsylvania gerrymandered?

AS. Very badly indeed. The Electoral Integrity Project, a global election watchdog organization, gave PA's redistricting process an 11 on a scale of 1 - 100, third worst of all the states by this measure. Until the congressional district map was redrawn in 2018, Pennsylvania's congressional district plan ranked as the most, or among the three most, gerrymandered states in the nation.

Q6. You can't take politics out of the redistricting process. Even the courts have recognized that political motivation doesn't make a redistricting plan invalid.

A6. HB 22 and HB 23 are designed to minimize the influence of political motivations and to create districts that respect existing county and municipal boundaries. When you look at what gerrymandering has done to state legislative and congressional districts in Pennsylvania, the status quo is indefensible. An independent citizens commission could not possibly do worse. No other advanced democracy in the world allows partisan politicians to draw their own political boundaries.

Q7. Why is the proposed legislation better than the current system? Legislators are accountable to the voters, while the commission members would not be.

A7. Under the current system, redistricting plans are developed by a small number of legislative leaders from each caucus, dominated by whichever party is in the majority. Those leaders are not accountable to voters in the districts being gerrymandered. HB 22 and HB 23 allow the General Assembly to determine the necessary qualifications of members of the independent commission, and the commission's decisions can be appealed to state courts.

QB. Is it true that gerrymandering is only a problem for congressional redistricting and not for state House and Senate district maps?

AS. No. Pennsylvania's legislative districts are among the worst gerrymanders in the nation, according to the Princeton Genymandering Project. In the November 2018 election, Democrats received 55% of the statewide vote, but they won only 45% of the 203 House seats. This discrepancy is not explained simply by the reality that more Democrats live in densely populated urban areas.

More significant is the fact that Republicans won their seats with a smaller percentage of the vote in each district (64.4 percent on average) compared with the share of the vote Democrats received in the districts they won (69.9 percent). This did not happen by accident. Rather, the 2011 House

226 Forster St, Harrisburg, PA 17102 I info@FairDistrictsPA.com I (800) 313-1S97

redistricting plan used highly sophisticated mapping technology to pack Democrats into districts where their votes were not needed for a Democrat to win and moved smaller blocks of Democrats into districts that remained "safe" for Republicans. The so-called "blue wave" of Democratic voters had limited impact on the state House because gerrymandering caused large numbers of Democratic votes to be "wasted."

By another measure, vote-to-seat skew, Pennsylvania's legislative districts showed a 9 percent gap between votes cast and seats won, compared to a 6 percent gap in the two next-most gerrymandered states, Michigan and North Carolina. In November 2018, Michigan's voters overwhelmingly approved an independent redistricting commission, while North Carolina's legislative districts have been the focus of continuing litigation.

Pennsylvania

60%

Democrats won

54 percent of tt1e statewide popular vote ...

50

, .. butjust

. 45 percent of House seats

40

Michigan

60%

53%

50

.47%

40

Suurcus: Secretaries of State for Penns11lvanla, Michigan and North Carolina

North Carolina

60%

51% 50

.45%

40

THE WASHINGTON POSl

Q9. How will the commission be independent if the Secretary of State - a political appointee - is involved in the process?

A9. The Department of State is already charged with numerous responsibilities having to do with our electoral process. As the head of that department, the Secretary of the Commonwealth - who is a constitutional officer - has a constitutional duty to promote the integrity of the electoral process. Other states have chosen to assign some of the responsibility for selecting commissioners to other agencies or appointees and there may be various options in Pennsylvania as well.

Q10. What would happen if the redistricting commission is unable to agree on new maps in time for the next election?

Al0. In the unlikely event that the commission deadlocks on a redistricting plan, the bills provide for an elimination-voting process. Each commissioner or group of commissioners would propose maps for congressional and state legislative districts. The commissioners would rank the maps in order of preference and the maps receiving the lowest combined ranking in each round of voting would be

226 Forster St, Harrisburg, PA 17102 I info@FairDistrictsPA.com I (800) 313-1597

eliminated, until only one map remains in each category. This keeps the redistricting process within the independent commission until the process is completed rather than allowing the Legislature or the courts to draw the maps as some other reform proposals would do if the commission cannot reach consensus.

Q11. Have independent citizen commissions in other states resulted in more even election results?

All. Several states have enacted laws to create redistricting commissions, including four (Colorado,

Ohio, Michigan and Utah) in just the past year. The laws differ in the degree of independence from the legislature and the criteria they would apply in drawing district lines. In general, voters have been pleased with the results. The best measure of success is that voters believe their votes count and that the number of seats won reflects more closely the wishes of voters.

Q12. Weren't there problems with the California redistricting process? There was a ProPublica article that said Democrats hijacked it.

A12. While HB 22 and HB 23 have similarities to California's legislation, the bills do not include language about "communities of interest" that opened the door to the problems addressed in the ProPublica article. Even though the California process wasn't perfect, most analysts agree it dramatically changed the tone of elections, opened the door to new voices and restored confidence in elections. Harvard's Kennedy School of Government recently awarded the California Citizens Redistricting Commission a $100,000 grant to support similar initiatives elsewhere, noting "the California Citizens Redistricting Commission shows how citizens can take the lead in redistricting efforts to construct maps that respect communities and citizens and are fair to political parties. It is an innovation that other states should consider emulating."

Q13. Why would a Republican legislator vote to change our redistricting procedures?

AlS. Gerrymandering has hurt the nation's capacity for problem-solving, with negative consequences for economic growth. In Pennsylvania, that's evident in a low state credit rating, in poor workforce development and in the kind oflegislative uncertainty that deters corporate investment.

Also, Republicans will not control the next round of legislative redistricting, as they did in 2011. The current PA Supreme Court now has a majority of justices elected as Democrats. It will be the final authority on the legality of any of the legislative or congressional maps drawn after the 2020 census. The state Constitution sets a high standard for legislative maps, stating that no counties or municipalities shall be divided "unless absolutely necessary." This provides the court with a strong basis to assert itself in any redistricting disputes that reach the court.

Under the current redistricting rules in the state Constitution, the five-person Legislative Reapportionment Commission includes four elected leaders of the state House and Senate, two Democrats and two Republicans, plus a fifth person to be chosen by those four. If the four can't agree on their fifth member, as usually occurs, the Constitution says the appointment shall be made by the Supreme Court. That could permit Democratic Party leaders to take control of the next round of legislative redistricting even though Republicans may still have majority control of both chambers of the General Assembly.

226 Forster St, Harrisburg, PA 77702 I info@FairDistrictsPA.com I (800) 373-7597

Resolutions of support for fair redistricting practices adopted by PA Municipalities, Counties and Associations

22 County Commissions that adopted a resolution in support:

Allegheny

Beaver*

15 With Republican Majorities 7 With Democratic Majorities

3,465,000 population 4,432,000 population Carbon* Centre* Chester*1

Clinton* Cumberland*

Dauphin Delaware* Erie* Greene*

Lehigh Luzerne Monroe* Montgomery1

Northampton* Northumberland* Perry Philadelphia* Warren Wyoming* York*

*15 unanimous 1Letter of Support

Democrat

32%

County Commissions Majority Party Make Up

Republican

68%

Associations that adopted resolution in support

Bucks County Boroughs Association PA State Association of Boroughs Capital Region Council of Governments

332 Municipalities, representing more than 3,800,000, have adopted a resolution in support: - f' Chautauqua ) 0 Salanea 1

laktwocxJo •Jamestown Oan

0 ' •

Allegheny ,lj Aspinwall Boro

Bell Acres Boro Crafton Bora

Forest Hills Bora Hampton Twp Heidelberg Baro

Marshall Twp Mccandless Twp Millvale Baro O'Hara Township Pittsburgh City Ross Township Shaler Township Sharpsburg Boro South Park Twp Swissvale Bora

West Deer Twp Wilkinsburg Bora

Beaver

Aliquippa City

Baden Baro Brighton Township Chippewa Township Hanover Township Hopewell Township Independence Township

Monaca Baro New Sewickley Township South Heights Bora Bedford

Bedford Baro Berks

Blair

Kutztown Baro New Morgan Baro Reading City Rockland Township Saint Lawrence Baro Union Township Wyomissing Baro

Altoona City

Hollidaysburg Bora Tyrone Baro Bradford

Athens Township Bucks

Bristol Township Buckingham Township Doylestown Baro

Doylestown Township Falls Township Haycock Township Langhorne Baro

Langhorne Manor Baro Lower Makefield Township Middletown Township Morrisville Baro New Britain Township New Hope Baro Newtown Baro

Newtown Township Riegelsville Baro Solebury Township Springfield Township Tinicum Township Warminster Township Warrington Township Yardley Baro

Butler

Butler City Cranberry Township Cambria

Cambria Township Ebensburg Baro Nanty Gia Baro Stonycreek Township

Upper Yoder Township Carbon

Bowmanstown Baro Lower Towamensing Twp Mahoning Township Nesquehoning Borough Palmerton Baro Summit Hill Bora Towamensing Township Centre

Bellefonte Baro Benner Township Burnside Township Centre Hall Bora College Township

Curtin Township Ferguson Township Gregg Township Halfmoon Township Harris Towns hip Howard Baro Howard Township Liberty Township Marion Township

Milesburg Bora Millheim Bora Patton Township Penn Township Philipsburg Bora Port Matilda Bora Potter Township Rush Township Snow Shoe Bora Spring Township State College Bora

Unionville Bora Walker Township Chester

Downingtown Bora East Marlborough Township East Pikeland Township East Whiteland Township Honey Brook Bora Kennett Square Bora

Chester, continued

Kennett Township London Britain Township London Grove Township Malvern Baro

New Garden Township Oxford Baro Penn Township Phoenixville Bora Pocopson Township Schuylkill Township South Coatesville Bora Upper Uwchlan Township Uwchlan Township West Bradford Township West Brandywine Township West Chester Bora West Goshen Township West Grove Bora West Marlborough Twp West Nottingham Township Clarion

Clarion Bora Highland Township Knox Bora Limestone Township Clinton

Allison Township Avis Baro

Bald Eagle Township Beech Creek Bora Beech Creek Township Castanea Township Chapman Township Colebrook Township Crawford Township Dunnstable Township East Keating Township Flemington Bora Gallagher Township Greene Township Grugan Township Lamar Township Leidy Township Lock Haven City Logan Township Loganton Baro Mill Hall Bora Noyes Township Pine Creek Township Porter Township

Clinton, Continued

Renovo Baro South Renovo Bora Wayne Township West Keating Township Woodward Township Cumberland

Camp Hill Baro Carlisle Bora East Pennsboro Township Lower Frankford Township Mechanicsburg Bora Middlesex Township Mount Holly Springs Bora Newville Bora Penn Township Silver Spring Township

Upper Allen Township Dauphin

Conewago Township Derry Township Elizabethville Bora Harrisburg City Highspire Bora Hummelstown Bora Lower Paxton Township Middletown Baro Mifflin Township Millersburg Bora Paxtang Bora Penbrook Bora Royalton Bora Steelton Bora Susquehanna Township Swatara Township

Upper Paxton Township West Hanover Township Delaware

Chadds Ford Township Chester City Chester Heights Bora East Lansdowne Bora Haverford Township Lansdowne Bora Media Bora Middletown Township Nether Providence Twp Radnor Township Rose Valley Bora Rutledge Bora

Delaware, continued

Swarthmore Baro

Erie

Upper Chichester Township Yeadon Bora

Erie City Franklin

Chambersburg Bora Greencastle Bora Greene

Perry Township Huntingdon

Mount Union Bora Indiana

Indiana Baro Lackawanna

Benton Township Dickson City Baro Dunmore Baro North Abington Township Scranton City South Abington Township Taylor Bora Vandling Bora Waverly Township Lancaster

East Petersburg Baro Lancaster City Lancaster Township

Manheim Baro Manheim Township Marietta Bora Millersville Bora Lebanon

Lebanon City Mount Gretna Baro Lehigh

Allentown City Coopersburg Bora Fountain Hill Bora Lower Macungie Township Lowhill Township Lynn Township Macungie Baro North Whitehall Township Salisbury Township South Whitehall Township

Upper Milford Township Upper Saucon Township Weisenberg Township Whitehall Township

Luzerne

Conyngham Bora Dallas Township Edwardsville Baro Exeter Township Forty Fort Bora Hazleton City Jackson Township

Kingston Township Lehman Township Plains Township Plymouth Bora Sugarloaf Township Swoyersville Baro Wilkes-barre City Wright Township Monroe

Chestnuthill Township Eldred Township Mount Pocono Bora Stroud Township Montgomery

Abington Township

Ambler Bora Bryn Athyn Baro Cheltenham Township Collegeville Baro East Norriton Township Jenkintown Baro

Lansdale Baro Lower Frederick Township Lower Merion Township Montgomery Township Narberth Bora New Hanover Township Norristown Baro North Wales Baro Pottstown Bora Skippack Township Springfield Township Upper Dublin Township Upper Moreland Township Upper Providence Township West Conshohocken Bora West Norriton Township West Pottsgrove Township Whitemarsh Township Whitpain Township

Northampton

Pike

Bethlehem City (& Lehigh Cnty) Bethlehem Township Easton City Forks Township Hanover Township Lower Saucon Township Palmer Township Washington Township Williams Township

Milford Baro Snyder

Selinsgrove Soro Susquehanna

Clifford Township Herrick Township

Tioga

Bloss Township Blossburg Soro Brookfield Township Chatham Township Elk Township Farmington Township Liberty Bora Liberty Township

Mansfield Soro Morris Township Nelson Township Roseville Bora Rutland Township Sullivan Township

Union Township Ward Township Westfield Bora Westfield Township

Warren

Warren City Washington

Washington City Wayne

Honesdale Bora Westmoreland

North Huntingdon Township Trafford Bora York

Glen Rock Bora Hallam Bora Hanover Baro Jefferson Bora

Mt. Wolf Bora West York Baro York City

January 29, 2020

A RESOLUTION IN SUPPOR T OF A CITIZENS COMMISSION FOR LEG­ ISLATIVE AND CONGRESSIONAL REDIS TRICTING

WHEREAS, the citizens of East Goshen Township of Chester County and the Commonwealth of Pennsylvania deserve a fair, fully transparent, impartial and depoliticized process of the decennia I drawing of state legislature and congres­ sional districts of near equal population; and

WHEREAS, legislative and congressional redistricting has at times resulted in ger­ rymandered districts that favor one political party over others; and

WHEREAS, such gerrymandering of legislative and congressional districts has worked at times to the detriment of our representative democracy; and

WHEREAS, the creation of a truly independent citizens redistricting commission devoid of political motivation or partisanship will: ensure a fair, transparent, and accurate legislative and congressional redistricting process that respects political subdivisions; prohibit districts from being drawn to favor or discriminate against a political party or candidate; require the use of impartial and sound methodology when setting district boundaries; require public input; and fully comply with the constitutional requirement that "no county, city, incorporated town, borough, township or ward" be divided "unless absolutely necessary," and

WHEREAS, legislation to amend the Pennsylvania Constitution to reform the de­ cennial legislative and congressional redistricting process with the intent of using fairness and sound methodology in a non-partisan fashion is required to ensure these reforms.

NOW, THEREFORE, BE IT RESOLVED that East Goshen Township of Chester County does hereby support legislative efforts to amend the Pennsylvania Con­ stitution to assign the decennial task of both legislative and congressional redis­ tricting to an independent citizens redistricting commission; and

BE IT FURTHER RESOLVED that we call upon all those elected officials and party leaders in the Commonwealth of Pennsylvania who represent the citizens of East Goshen Township of Chester County (see list below) to publicly announce their support of and commitment to work towards passage of such legislative ef­ forts, and that a copy of this resolution be delivered to each of them.

Governor Tom Wolf

Lieutenant Governor John Fetterman

Attorney General Josh Shapiro

1

Acting Secretary of Commonwealth Kathy Boockvar

United States Senator Bob Casey

United States Senator Pat Toomey

United States Representative Chrissy Houlahan

Pennsylvania Senator Thomas Killion

Pennsylvania Representative Carolyn Comitta

Michele Kichline, County Commissioner

Marian Moskowitz, County Commissioner

Josh Maxwell, County Commissioner

Chair, Democratic Party of Pennsylvania, Nancy Patton Mills

Chair, Republican Party of Pennsylvania, Lawrence Ta bas

RESOLVED AND APPROVED this ___ day of ___ H 2020

BOARD OF SUPERVISORS of EAST GOSHEN TOWNSHIP:

Secretary

F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2020\Redestricting Feb 2020.docx

2

Memo

Date: To: From: Re:

February 7, 2020 Board of Supervisors Rick Smith, Township Manager Construction Ordinance

The attached ordinance would prohibit construction and/or demolition between the hours of I 0 PM and 7 AM. This would eliminate the need to have the Township Engineer to take noise readings if a contractor was working after IO PM.

N:\Data\Shared Data\Admin Dept\Township Code\Construction\Memo to BoS 020720.doc

I EAST GOSHEN TOWNSHIP 2 3 CHESTER COUNTY, PENNSYLVANIA 4 5 ORDINANCE NO. 6 7 8 AN ORDINANCE OF THE TOWNSHIP OF EAST GOSHEN, 9 CHESTER COUNTY, PENNSYLVANIA, AMENDING THE EAST 10 GOSHEN TOWNSHIP CODE, BY ADDING A NEW CHAPTER 11 122 ENTITLED "CONSTRUCTION & DEMOLITION" IN ORDER 12 TO REGULATE SUCH ACTIVITIES WITHIN THE TOWNSHIP TO 13 PROTECT THE PUBLIC HEAL TH, SAFETY AND WELFARE. 14 15 16 BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen 17 Township that the East Goshen Township Code shall be amended as follows: 18

19 SECTION 1. The East Goshen Township Code is hereby amended to include a 20 new Chapter 122 which shall be entitled "Construction & Demolition" and read as 21 follows:

22 "Chapter 122 Construction and Demolition 23 24 § 122-1. Definitions. As used in this chapter, the following terms shall have the 25 meanings indicated: 26 27 CONSTRUCTION 28 29 Any of the following activities; 30 31 1) Site preparation, including but not limited to clearing, grubbing, earthmoving, 32 excavation or grading.

33 34 2) The installation of any type of pipe or appurtenances, including but not limited 35 to storm sewer, sanitary sewer, water main, gas line, pipeline, inlets, valves, fire 36 hydrants, service lines or manholes. 37

38 3) The erection, repair, alteration of any building or structure or part thereof. 39 40 4) The assembly, erection, repair, alteration of any, wire, cable, pole, conduit, 41 fixture, light standard or cabinet or part thereof. 42 43 5) The repair, alteration or addition of any driveway, parking lot, curbing, paving, 44 parking area, sidewalk, patio. 45

I

1 DEMOLITION 2 3 Any of the following activities; 4 5 1) The dismantling, intentional destruction or removal of any type of pipe or 6 appurtenances, including but not limited to storm sewer, sanitary sewer, water 7 main, gas line, pipeline, inlets, valves, fire hydrants, service lines or 8 manholes. 9 10 2) The dismantling, intentional destruction or removal of any building or structure 11 or part thereof. 12 13 3) The dismantling, intentional destruction or removal of any wire, cable, pole, 14 conduit, fixture, light standard or cabinet or part thereof. 15 16 4) The intentional destruction or removal of any type any driveway, parking lot, 17 paving, parking area, sidewalk, patio,

18 EMERGENCY 19 20 Any occurrence or set of circumstances involving actual or imminent physical 21 trauma or injury or property damage which demands immediate action.

22 EMERGENCY WORK 23 24 Any work performed for the purpose of preventing or alleviating the physical trauma 25 or property damage threatened or caused by an emergency. 26 27 PERSON 28 29 Any individual, association, partnership or corporation, including any officer, 30 employee, department or agency. 31 32 § 122-2. Prohibitions.

33 No person shall permit any construction and/or demolition to occur on any private or 34 public property, easement, road or street within the boundaries of East Goshen 35 Township, Chester County, Pennsylvania between the hours of 10:00 PM and 7:00 AM. 36 37 § 122-3. Exemptions 38 39 The following activities are exempt from the provisions of this ordinance: 40 41 A. Emergency work to provide or restore electricity, water or other public utilitiesl[KCIJ. 42 43 B. Work or activities performed or sponsored by governmental agencies or their

44

contractors in the performance of public service.

2

1 2 C. A snowplow, snow blower or other similar device, salt truck, or loader used to 3 remove snow or ice. 4 5 D. Construction or demolition for which a building permit has been issued that are 6 completely contained within an existing building or in a new building or part thereof, 7 which is complete with walls, windows and doors. The decision as to whether or not 8 a new building or part thereof is complete shall be made by the Building Code 9 Official. [[Kc21 10 11 12 13 14 15 16 17 18 19 20 21 22

23

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

39

40 41 42 43 44 45 46

§ 122-4. Violations and penalties.

Any person who violates or permits the violation of any provision of this chapter shall, upon conviction thereof in a summary proceeding brought before a District Justice under the Pennsylvania Rules of Criminal Procedure, be guilty of a summary offense, and shall be subject to the payment of a fine of not less than $100 and not more than $1,000, plus the costs of prosecution. In default of payment thereof, the defendant may be sentenced to imprisonment in the county prison for a term of not more than 30 days.

Each section of this chapter violated shall constitute a separate offense, and each day or portion thereof in which a violation of this chapter is found to exist shall constitute a separate offense, each of which violations shall be punishable by a separate fine imposed by the District Justice of not less than $100 and not more than $1,000, plus the costs of prosecution, or upon default of payment thereof, the defendant may be sentenced to imprisonment in the county prison for a term of not more than 30 days. All fines and penalties collected for the violation of this chapter shall be paid to the

Township Treasurer.

SECTION 2. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors of East Goshen Township that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.

SECTION 3. Repealer. All Ordinances or parts of Ordinances conflicting with any provisions of this Ordinance are hereby repealed insofar as the same affects this Ordinance.

SECTION 4. Effective Date. This Ordinance shall be effective five (5) days following enactment as by law provided.

ENACTED AND ORDAINED this __ day of ____ , 2020.

3

1 2 Louis F. Smith, Secretary 3 4 5 6 7 8 9 10 11 12 13

E. Martin Shane, Chairman

David E. Shuey, Vice Chairman

Michael P. Lynch, Member

14 John F. Hertzog, Member 15 16 17 18 Michele D. Truitt, Member 19 20 N:\Data\Shared Data\Admin Dept\Township Code\Construction\534914.doc 21 22 23 24

4

Memo East Goshen Township

Date: February 11, 2020 To: Board of Supervisors From: Rick Smith, Township Manager Re: ABC Goals and Comp Plan Objectives

Attached is a matrix of the 2015 Comp Plan Objectives with comments on what steps have been

taken to achieve each objective.

It might be useful for the Board to keep these objectives in mind when reviewing the minutes for the January 28, 2020 Planning Session, in order to determine if there is a specific goal or goals that they would like each ABC to focus on in 2020 ..

N:\Data\Shared Dala\A.BC'S\Goa!s\2020\Memo 021120.doc

COMP PLAN UPDATE - Last revised February 10, 2020 1

Completion Responsibility Method of Potential COMMENTS Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

5. Housing Plan

Encouraging the rrownship has adopted the Property Maintenance Code 5.1. maintenance and * on-going PS Development, PS improvement of the Plan Review existing housina stock Continuing to provide * ­C recommended residential units over commercial units in 5.2. opportunities for a variety on-going BOS PC zo PS rrND-1 in 2019 of housing types. Encouraging infill Beard considered allowing semi-detached dwellings, with no opportunities by providing ncrease in density under Open Space section of the Zoning 5.3. for additional dwelling * on-going PC BOS, FC ZO, SLDO, PS Ordinance in 2019. Not approved units, without adversely Plan Review PC recommended residential units over commercial units in impacting the character of TND-1 in 2019. No decision as of this report existing neighborhoods. Redeveloping selected Presented LERTA to WCASD in 2016 properties along West Development, 2017 -WCASD is not interested in LERTA 5.4. Chester Pike in order to 3 2 to 10 years PS PS provide for new housing Plan Review

opportunities. Encouraging mixeduses * Board accepts proposal from Comitta to update Open Space 5.5. and mixed housing types on-going BOS PC zo PS zoning provisions to allow for other housing type with no where appropriate. ncrease in density on 6/19/18. BOS held informational meeting on 10/25/18 BOS held second informational meeting at East High School on 1122/19. BOS decides not to Q.._roceed with ordinance on 2/2/19

Encouraging the Presented LERTA to WCASD in 2016 Redevelopment of vacant Development, 2017 -WCASD is not interested in LERTA 5.6. and/or underperforming 3 5 to 10 years PC PS PS Board considered allowing apartments in BP District in 2019. lots to create new housing Plan Review Not approved opportunities. 5.7. Fostering opportunities for 2 2 to 10 years BOS PC zo PS, CCC aging in Place.

6. Land Use Plan

Transforming the Town Plan Review, Obtained grant for Paoli Pike Master Corridor Plan in 2016 6.1. Center into a viable, 1 1 to 10 years PS BOS, PC Development PS,PT Adopted Paoli Pike Master Corridor Plan 12/19/17 walkable, visitable Place. Accepted proposal from Comitta in April 2018. Sent letter to residents on 5/9/18 Comitta presentation to BoS on 6/25/19 Joint BoS & PC meeting on 7/30/19 Public info meeting on 10/22/19

Public hearing to adopt ordinance scheduled for 12/17/19 Public hearing canceled - To many people !Paoli Pike Trail started construction in 2019.

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE - Last revised February 10, 2020 2

Transforming the Paoli Obtained grants for Paoli Pike Trail Segments C to G in 2016 6.2. Pike Corridor into a 1 1 to 10 years BOS PC, PT, Special Study PT, DVRPC Obtained grants for all Segments except B. walkable, connected, CCC 12019 - started engineering for Segments A & B artery. !Started construction on Segments F&G 9/16/19 Signal at Hibberd Lane in service 11/1/19

PennDOT opened bids for Segments C, D & E 11/15/19. BoS concurred with bid award for C, D & E on 1/6/20

Pre-con meeting at Penn Dot on 1/30/20

Transforming the West 6.3. Chester Pike Corridor into 2 2 to 20 years PS BOS, Special Study PT,PS,DVRPC a more functional and PC,PT attractive arterv. Continuing to receive Conducted Annual ABC Sessions in 2016, 17, 18, 19 & 20. 6.4. guidance from the * on-going BOS PC, Meetings, Workshops GF Authorities, Boards and ABC's Commissions /ABC's). Continuing effective 6.5. governance by the East * on-going BOS Meetings, Hearings GF Goshen Township Board of Supervisors. Continuing to Approved new Day Care facility on Wilson Drive in 2019 accommodate a diverse 6.6. mix of residential, * on-going BOS PC, FC ZO, Plan Review PS commercial, institutional, light industrial, and recreational uses.

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

7. Economic Development Strategy

Promoting the ·dopted Paoli Pike Master Plan 12/19/17 7.1. enhancement of * on-going BOS PC,CC, ZO, SLDO, PS, GF ¸ted proposal from Comitta in April 2018. business opportunities in FC Plan Review !Sent letter to residents on 5/9/18 the Town Center. K:omitta presentation to BoS on 6/25/19 I.Joint BoS & PC meeting on 7/30/19

Public info meeting on 10/22/19 !Public hearing to adopt ordinance scheduled for 12/17/19

Public hearing canceled - To many people

Promoting the Presented LERTA to WCASD in 2016 enhancement of * PC,CC, ZO, SLDO, 2017 WCASD is not interested in LERTA 7.2. business opportunities on-going BOS PS, GF along the West Chester FC Plan Review

Pike Corridor.

Allowing for new uses BoS Ado!)t__ed Incubator Ordinance on 10/1/19 and smaller incubator PC,CC, ZO, Plan Review, 7.3. businesses in the 1 1 to 10 years BOS PS corporate parks and the FC Development

industrial park.

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE - Last revised February 10, 2020 3

Continuing the use of armers Market canceled in 2019 East Goshen Park for !Started Food Truck Festival in 2017 7.4. the Farmers Market and * on-going BOS PR Programs, GF !A.dded alcohol sales to Food Truck Festival in 2019 other context-sensitive Development enterprises and activities. Utilizing the Commerce Commerce Commission was disbanded on 1/4/2016 Commission with the business community, in * Workshops, 7.5. order to identify and on-going cc BOS Newsletter, PS address needs Website pertaining to business growth and expansion. Providing opportunities Pratt TND-1 Ordinance allowed for shared uses. No decision for shared parking Ïs of this report 7.6. opportunities for smaller 2 2 years BOC PC 20, SLDO PS commercial establishments. Continuing No-Impact Home-Based * 7.7. Businesses, Horne on-going BOS PC,PS 20,SLDO PS Occupations, and Horne- Related Businesses.

8. Transportation & Circulation Systems Plan

Continuing toprovide Re decked Bridge on East Boot Road in 2016 8.1. safe, well-maintained * on-going BOS PT Maintenance GF, PT roads throughout the Rebuilt abutments and installed new guide rail at Forest Lane Township. Bridge in 2019/20

'"'ontinuing with 17 year paving cyde program Identifying and f'l,daptive Signal Project for West Chester Pike was let on implementing regional 1/12/18

8.2. highway improvement 1 1 to 10 years BOS PT, Special Study PT, DVRPC IPreCon meeting at PennDOT 4/2/18 projects that enhance DVRPC !Signal Project was completed on 12/4/19 mobility, safety, and

!2119/19 accepted proposal from McMahon for traffic study for reduoe congestion.

King Road and 352, EWT decided not to proceed with project on 12/12/19

13oS adopted joint resolution to proceed with Boot Road Restriping on 4/23/19. WG BoS adopted joints resolution on 6/18/19

HOP Plan submitted to PennDOT on 1/17/20 WG will bid i:1roject in 2020.

Minimizing speeding January 2018 - Installed temporary speed humps in Wyllpen vehicular traffic on the -arms during Dutton Mill Road Bridge closure

8.3. local roadways and * on-going BOS PT Maintenance, PT,PS minimizing cut-through Development nstalled additional Speed Limit signs in Lockwood Chase to vehicular traffic within Fiddress "cut thru" traffic in November 2019 neighborhoods.

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE- Last revised February 10, 2020 4

Implementing vehicular nstalled additional Speed Limit signs in Lockwood Chase to traffic flow and traffic Plan Review, ddress "cut thnJ" traffic in November 2019 8.4. calming improvements 2 2 to 10 years BOS PT PT, GF for select roads and Maintenance

intersections. Reducing vehicular traffic by supporting 8.5. public transportation * on-going BOS DVRPC Special Study DVRPC, PT opportunities and travel demand management techniques.

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources

8. Transportation & Circulation Systems Plan (continued)

Increasing pedestrian Obtained grants for Paoli Pike Trail Segments C to G in 2016 circulation along Paoli Obtained grants for all Segments except B Pike, especially in the 2019 - started engineering for Segments A & B form of a "Paoli Pike Started construction on Segments F&G 9/16/19 Promenade" with ISignal at Hibberd Lane in Service 11/1/19 Sidewalks and Special Study, GF, CCC, PennDOT opened bids for Segments C, D & E 11 /15/19. 8.6. Crosswalks, as well as 1 1 to 10 years BOS PC.PR DVRPC, BoS concurred with bid award for C, D & E on 1/6/20 increasing pedestrian ZO, SLDO DCNR Pre-con meeting at Penn Dot on 1/30/20 circulation and pedestrian safety along Greenway, with Trails, Walkways, and Crosswalks.

Implementing the East 8.7. Goshen Township Act * on-going BOS PC Plan Review PS 209 Transportation Plan

9. Community Facilities and Services Plan

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE - Last revised February 10, 2020 5

Maintaining and

9.1. expanding the Open 2 2 to 20 years BOS PC, PR, Special Study GF, CCC, Space, Recreation, and CB DCNR Trails Network. Developing the Paoli Obtained grants for Paoli Pike Trail Segments C to G in 2016 Pike Trail to create the Obtained grants for all Segments except B linkage between West PC, PR, GF, PT, CCC, 12019 - started engineering for Segments A & B 9.2. Chester and Malvern, 1 1 to 10 years BOS Special Study Started construction on Segments F&G 9/16/19 through East Goshen, PT, CCC DCNR PennDOT opened bids for Segments C, D & E 11/15/19. from West Goshen to BoS concurred with bid award for C, D & E on 1/6/20 Willistown. Pre-con meeting at Penn Dot on 1/30/20 Maintaining and * Maintenance, Obtained grants for Playground Renovations in 2016 9.3. upgrading East Goshen on-going BOS PR GF, Started construction in Fall of 2017 Park. Rec Fee in Lieu DCNR Completed construction of Destination Playground in 2018 Completed Serpentine Project in 2019

Continuing to provide * Added additional programs for seniors in 2019. 9.4. high quality Recreation on-going BOS PR Programs GF, Services. DCNR Continuing to provide * 1/2/18 - Updated Emergency Services resolution to address 9.5. high quality Police, Fire on-going BOS Maintenance GF, change in Advance Life Support provider. and EMS services. DCED Continuing the [Created position of Office Manager in 2019 provisions of effective * 9.6. administrative, public on-going BOS MA Maintenance GF works, and related services. Continuing to support * 9.7. important and viable on-going BOS PR Maintenance GF Community Facilities.

10. Utilities Plan

Continuing to provide Updated West Goshen Sewer Agreement approved on 8/16/17 effective sewage West Goshen Sewer Project is ongoing 2018, 2019

10.1. disposal and wastewater * on-going BOS MA Development PS treatment with oversight of the Municipal Authority. Continuing to provide Rebid refuse and recycling contract in 2016

10.2. effective solid waste * on-going BOS MA Maintenance GF disposal, and recycling services. Maintaining the role of the East Goshen 10.3. Township Municipal * on-going BOS MA Special Study, PS Authority for evaluating Plan Review sewered and unsewered areas.

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary I Other (3) Sources(2)

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE - Last revised February 10, 2020 6

10. Utilities Plan (continued)

10.4. Cooperating with Aqua * on-going PS Development PS on Public Water Supply

Maintaining effective * BoS adopted 'high tunnels" amendment to Stormwater 10.5. Stormwater on-going BOS DEP Plan Review PS Ordinance in 2019. Management

Regulating pipelines to * Determined that pipelines are regulated by PHMSA and the PA 10.6. protect land uses and on-going BOS DEP Plan Review CCC, PS PUC. the environment. Created Pipeline Task Force in 2018.

11. Natural Resource Protection Plan

Protecting the Riparian PC, Milltown Dam and Hershey Mill Dam Park Projects are in 11.1. Areas along Ridley and * on-going BOS DEP, CB, DCNR, DEP PS, DCNR, DEP progress. Chester Creeks and their tributaries. DCNR Milltown Dam Project Pre Application meeting 8/6/19 Accepted proposal from GF for floodplain study in 2019

Hershey Mill Dam Project All easements obtained 2/28/19. DEP Permit issued 11 f7/19 U.S. ACOE permit issued 11/20/19 Accepted proposal for GF for Bidding Services 1 /21/20

Considering HM Dam and Milltown Dam projects support this objective. opportunities for a * PC, PR, Special Study, 11.2. Greenway Network on-going BOS DCNR Plan Review DCNR, GF along Chester and Ridley Creeks.

11.3. Preserving and * on-going BOS PC,CB Plan Review PS enhancing Street Trees.

Continuing the advocacy * Website, 11.4. role of the Conservancy on-going CB BOS GF Board. Plan Review

Continuing riparian CB planted trees on East Boot Road in 2016

11.5. buffer plantings 1 1 to 20 years CB DCNR Planting GF, DCNR CB planted trees in Marydel! in 2017 throughout the CB planted wetland plant by Blacksmtth Shop in 2018 Township. B Planted on East Boot Road in 2019

11.6. Continuing to control * on-going CB DCNR DEP, PS invasive species. Plan Review

11.7. Improving woodland 2 2 to 5 years BOS PC,CB ZO, SLDO GF, CCC protection standards.

Reviewing and updating ZO, SLDO, 11.8. tree replacement 2 2 to 5 years BOS PC,CB GF,CCC standards as needed. Plan Review

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE- Last revised February 10, 2020 7

Reviewing and updating ZO, SLDO, 11.9. criteria for non-buildable 2 2 to 5 years BOS PC,CB GF, CCC areas. Plan Review

Improving and * ZO, SLDO, 11.10. enhancing Green on-going BOS PC, PS GF, DCNR Infrastructure Plan Review

12. Energy Conservation Strategy

Creating more compact, TND1 and TND 2 Ordinances support this objective 12.1. mixed-use, walkable * on-going PS BOS, Plan Review, PS, DCED places. PC, FC Development

Advocating energy BoS created Sustainability Advisory Committee on 9/4/18

12.2. conservation for * on-going BOS PC,CB, Website, GF, DEP residents, businesses, FC Newsletter and institutions.

Advocating green BoS agreed to fund WCACOG Energy Transition Plan on 12.3. building and site * on-going BOS PC, CB, ZO, SLDO, GF, DEP, development practices. FC Special Study DVRPC a1s119_

Cadmus presented Plan on 1 /29/20

Promoting and 12.4. enhancing the protection * on-going BOS PC, CB, ZO, SLDO, PS, DCNR of Woodlands. DCNR Plan Review

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding

(1) Primary Other (3) Sources

12. Energy Conservation Strategy (continued)

Designating areas for 12.5. compact car parking, in 2 2 to 5 years BOS PC ZO, SLDO, PS order to reduce the size Plan Review of off-street oarkinq lots. Encouraging park and PT, 12.6. ride facilities, shared * on-going BOS CCC, BOS, DVRPC, PT, DVRPC, parking, and increased DVRPC CCC,PT BOS oublic transoortation. Providing conservation 12.7. tips on the Township * on-going BOS CB Website GF website.

13. Historic Resources Protection Plan

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

COMP PLAN UPDATE - Last revised February 10, 2020 8

Continuing the East Both the Plank House and Blacksmith Shop are open on Goshen Historical $elected days. Commission (EGHC)

programs at the * HC Programs, 13.1. Blacksmith Shop and on-going HC BOS GF Plank House, and Special Study

refinement of the Township Historic

Property Inventory. Continuing to have the EGHC comment on applications for * 13.2. subdivision and land on-going HC PC SLDO PS development involving and adjacent to Historic properties. Continuing to have the EGHC provide * Website, 13.3. educational information on-going HC GF for the Township website Newsletter

and Newsletter. Utilizing the characteristics of

13.4. Goshenville and Rocky 3 5 years HC PC, BOS ZO, SLOO CCC. Hill to guide the character of nearby GF

development.

Reviewing Historic 13.5. Preservation 1 1 to s years HC PC ZO, SLOO CCC, requirements. GF

Considering simplified 13.6. Historic Preservation 2 2 to 5 years HC PC ZO, SLDO CCC, standards. GF

N:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2020\021020.docx

Memo

To: Board of Supervisors From: Jon Altshul Re: Consider grant application for gas leak detectors through Energy Transfer First Responder Fund Date: February 13, 2020

Energy Transfer has a First Responder Fund that provides grants for first responder organizations. While East Goshen Township is not technically a first responder organization, given the unique role that our Public Works Department plays for the Goshen Fire Company, as well as the length of the Mariner East pipelines in the Township and the proximity of those lines to densely populated areas, we believe that we may be competitively positioned to receive a grant.

Specifically, this fund could provide funding for two gas leak detectors and calibration equipment. Based on his conversations with area fire companies, Mark Miller believes the hand held Sensit Gold G2 leak detection system, which can detect butane, propane and ethane, is appropriate for our needs. We have received a quote of $6,487.05 for the equipment.

Recommended motion: Mr. Chairman, I authorize staff to apply for funding through the Energy Transfer First Responder Fund for two gas leak detectors and calibration equipment.

Energy Transfer First Responder Funcl·

With more than 85,000 miles of pipelines and associated assets in 38 states,

Energy Transfer is fully committed to the safe, environmentally sound and efficient operation of our pipeline systems.

This commitment to operational excellence is enhanced by increasing public awareness, training and supporting first responders, implementing understanding of pipeline locations and operations, and supporting first responder organizations to ensure safe operations and emergency preparedness throughout our operational area.

The Energy Transfer First Responder Fund will provide grants on a biannual basis to assist the primary mission of first responder organizations. Grants will be determined based on a competitive application and review process.

Are You Eligible to Apply?

Eligible first responder organizations include local fire departments, emergency medical services, county emergency management agencies, county, regional and local police departments, and other agencies.

Eligible Funding Requests

Firefighter, emergency responder equipment

Modifications to stations and facilities

Training including:

First responder/emergency medical responder training

National Incident Management System (NIMS)-lncident Command (ICS)

Utility protection

Vehicle rescue

Hazardous materials (hazmat)

Firefighter personal protective equipment including:

Boots, pants, coats, gloves, hoods, goggles, helmets and coveralls

American National Standards Institute

(ANSI-approved retro-reflective gear)

PPE for hazardous materials and other specialized incidents

EMS activities (coats, trousers and jumpsuits must meet NFPA or OSHA standards)

Energy Transfer First Responder Fund

212 North Third Street, Suite 201 Harrisburg, PA 17101 717.236.1731

'-- ENERGY 'C:,... TRANSFER

How to Apply

For us to assess your organization's request, we ask that you submit a detailed written request via certified mail with the following information:

1. Requesting organization - name, address and operational service area.

2. A detailed description of equipment, personal protective equipment, modifications to facilities and/or training to be procured with funding.

3. A detailed quote/estimate from third party vendor for any equipment, persona! protective equipment, modifications to facilities and/or training to be procured with funding.

4. A detailed description of how funding would improve the applicant's ability to perform its primary mission or expand critical capabilities,

5. A detailed description of Energy Transfer assets within your organization's service area.

6. Detailed mapping of applicant's service area.

7. Funding amount requested.

8. Any obtained matching funds and project fundraising deadlines.

9. Any organizational minutes or resolutions authorizing fundraising for said project. A completed form W-9 "Request for Taxpayer Identification Number" (TIN) and Certification Form.

Not sure if your request is eligible? Call Energy Transfer at 717-236-1731.

Approval Process

Awards are determined by priorities and competitiveness by the selection committee on a biannual basis. Applicants will be notified of the approval decision in writing in a timely manner subsequent to committee review. Approved applicants will receive personal notification from an Energy Transfer representative who will work with the organization to process the grant.

Awardees are not eligible for funding in consecutive calendar years.

Terms and Conditions

By accepting an award of funds, the applicant acknowledges that the funds will be used for the purposes identified in the application.

By accepting an award of funds, the applicant verifies that the statements made in its application are true and correct.

By accepting an award of Funds, the applicant verifies that all required authorizations and approvals from the applicant's leadership (i.e. board of directors or officers),

for project fundraising and the application to Energy Transfer for funding, have been obtained.

In the event that any of the above are determined to be inaccurate, Energy Transfer reserves the right to seek repayment of the funds so that the funds can be used for purposes consistent with the Energy Transfer First Responder Fund.

!n the event the applicant is awarded, Energy Transfer reserves the right to publicize at its discretion.

Energy Transfer First Responder Fund

212 North Third Street, Suite 201 Harrisburg, PA 17101 717.236.1731

ENERGY

.. TRANSFER

610-692-7171

www.eastgoshen.org BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

February 12, 2020

To:

From:

Re:

Board of Supervisors

Mark Miller

Group Bids 2020

We have solicited bids Tri-Axle Dump Trucks. On January 12, 2020 at 10:00am all group bids were opened.

The results are as follows:

Tri-Axle Dump Truck Rental Per Hour Ethan Patton Transpo11, LLC $100.00 per hour

We recommend that Ethan Patton be awarded the bid for Tri-Axle Dump Truck.

F:\Data\Shared Data\Public Works Dept\Bids\Group Bid I-Vl\2020\Letter to BOS for awarded trucking bids 2020-.doc

January 28, 2020

East Goshen Township Jon Altshul, Assistant Township Manager and Finance Director 1580 Paoli Pike West Chester, PA 19380

Dear Mr. Altshul:

Thank you for submitting an application on behalf of East Goshen Township to the 2019 PECO Green Region Open Space Program for funding for the open space project entitled Marydell Pond.

While your application was well-crafted, the project was not selected at this time to receive funding. For the 2019 Regular Round we received over 60 applications, which unfortunately means there were several compelling projects we were unable to fund. That said, I strongly encourage you to re-apply this fall as the field of applicants and proposed projects varies every round.

We are sorry that our response could not have been more favorable. We wish East Goshen Township success in moving forward with this endeavor.

Sincerely,

Estelle Wynn Dolan

PECO Green Region Open Space Program Administrator

Admi11istrator: Natural lands, attn: Estelle Wynn Dolan 1031 ?aimers Mill Road, Media, PA 19063 ~ 610-353-5587 ~ edolan@natlands.org

~'"'"=""9

'" (..'l••i..,111'

c,o 7162 Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules

DEPARTMENT OF TRANSPORTATION

Pipeline and Hazardous Materials Safety Administration

49 CFR Parts 192 and 195

[Docket No. PHMSA-2013-0255]

RIN 2137-AF06

Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards

AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA}, DOT.

ACTION: Notice of proposed rulemaking.

SUMMARY: PHMSA is proposing to revise the Pipeline Safety Regulations applicable to newly constructed and entire! y replaced onshore natmal gas transmission and hazardous liquid pipelines to mitigate ruptures.

Additionally, PHMSA is rnvising the regulations regarding rupture detection to shorten pipeline segment isolation times. These proposals address congressional mandates, incorporate recommendations from the National Transportation Safety Board, and are necessary to reduce the consequences of large-volume, uncontrolled releases of natural gas and hazru·dous liquid pipeline ruptures.

DATES: Persons interested in submitting written comments on this NPRM must do so by April 6, 2020.

ADDRESSES: You may submit comments identified by the docket number PHMSA-2013-0255 by any of the following methods:

Comments should reference Docket No. PHMSA-2013-0255 and may be

submitted in the following ways:

• Fedeml eRulemaking Portal: http:// www.regulations.gov. This site allows the public lo enter comments on any Federal Register notice issued by any agency. Follow the online inst.ructions for submitting comments.

• Fax:1-202-493-2251. • Mail: U.S. DOT Docket Operations Facility (M-30), West Building, 1200 New Jersey Avenue SE, Washington, DC 20590. • Hand Delive1y: DOT Docket Operations Facility, West Building, Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590 between 9:00 a.m. and 5:00 p.m., Monday through Friday, except Federal holidays.

Instructions: Identify the docket number, PHMSA-2013-0255, at the beginning of your comments. If you mail your comments, submit two copies. To confirm receipt of yotir comments, include a self-addressed, stamped postcard.

Note: All comments ru·e posted electronically in their original form, without changes or edits, including any personal informalion.

Privacy Act Statement

In accordance with 5 U.S.C. 553(c), DOT solicits comments from the public to better inform its rulemaking process. DOT posts these comments, without edit, including any personal information the commenter prmrides, to

www.regulaLions.gov, as described in the system of records notice (DOT/ ALL- 14 FDMS), which can be reviewed at www.dot.gov/privacy.

Confidential Business Information

Confidential Business Information (CBI) is commercial or financial information that is both customarily and actually h'eated as private by its owner. Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure. If your comments responsive to this notice contain commercial or financial information that is customarily treated as private, that you actually treat as private, and that is relevant or responsive to this notice, it is important that you clearly designate the submitted comments as CBI. Pursuru1t to 49 CFR 190.343, you may ask PHMSA to give confidential treatment to information you give to the agency by taking tl10 following steps: (1) Mru·k each page of the original document submission containing CBI as "Confidential"; (2) send PHMSA, along with the original document, a second copy of the original document with the CBI deleted; and (3) explain why the information you are submitting is CBI. Unless you are notified otherwise, PHMSA will treat

such marked submissions as confidential under the Freedom of Information Act, and they will not be placed in the public docket of this

notice. Submissions containing CBI should be sent to Robert Jagger at U.S. DOT, PHMSA, PHP-30, 1200 New Jersey Avenue SE, P.HP-30, Washington, DC 20590-0001. Any commentary PHMSA receives that is not specifically designated as CBI will be placed in the public docket for this matter.

FOR FURTHER INFORMATION CONTACT: Technical questions: Steve Nanney, Project Manager, by telephone at 713- 272-2855. General information: Robert Jagger, Senior Transportation Specialist, by telephone at 202-366-4361.

SUPPLEMENTARY INFORMATION: I. Executive Summary

A. Purpose of Regulatory Action Il. Summary of the Major Provisions of the

Regulatory Action C. Costs and Benefits

11. Backgrnund A. General Authorily B. Major Pipeline Accidents

C. National Transportation Safety Board

Recommondat\ons D. Advance Notices of Proposed

Rulemaking (ANPRM) E. Pipeline Safety, Regulatory Certainty,

and Job Creation Act of 2011 and Related Studies i. Section 4-Automatic and Remote-

Cont.rolled Shut-Off Valves a. GAO Report GAO-13-168 b. ORNL Report ORNL/TM-2012/411 ii. Section 8-Leak Detection F. PHMSA 2012 R&D Forum, "Leak

Detection and Mitigation" Ill. Proposed Ruplure Detection and

Mitigation Actions and Analysis of ANPRM Comments A. Definition of Rupture Il. Accident Response and Mitigation

Measures i. Installing Remote Control Valves (RCVs)

and Automatic Shutoff Valves (ASVs) ii. Standai·ds for Rupture Identification and

Response Times iii. Using RCVs and ASVs in All Cases C. Drills to Validate Valve Closure

Capability D. Maximum Valve Spacing Distanco i. Gas Transmission Pipelines ii. Valve Spacing in Response to Class

Location Changes iii. Hazardous Liquid Pipelines E. Protection of High Consequence Arnas

(HCAs) i. Gas Transmission Pipelines ii. Hazardous Liquid Pipelines F. Failure Investigations IV. Section-by-Section Analysis of Changes to

49 CFR Part 192 for Gas Transmission Pipelines V. Section-by-Section Analysis of Changes to

49 CFR Part 195 for Hazardous Liquid Pipelines VI. Regulatory Analyses and Notices

I. Executive Summary

A. Pu1pose of the Regulato1y Action

PHMSA seeks notice and comment on proposed revisions to the Pipeline Safety Regulations for both gas transmission and hazardous liquid pipelines. PHMSA is proposing regulations to meet a congressional mandate calling for the installation of remote-control valves (RCV), automatic shutoff valves (ASV), or equivalent technology, on all newly constructed and fully replaced gas transmission and hazardous liquid lines. However, consistent with the mandate, PHMSA recognizes that there may be locations where it is not economically, technically, or operationally feasible to install RCVs, ASVs, or equivalent technology. Therefore, PHMSA is proposing to allow operators lo install manual valves at these locations, provided operators have a sufficient justification for using a manual valve instead of an RCV, an ASV, or

Federal Register / Vol. 85, No, 25 /Thursday, February 6, 2020 /Proposed Rules 7163

equivalent technology, and provided that operators appropriately station personnel to ensure that a manual valve

can be closed within the same 40- minute timeframe PHMSA is proposing in this rulomaking for RCVs, ASVs, and equivalent technology. This will help to ensure that a consistent level of safety is provided whether operators use manual valves, RCVs, ASVs, or equivalent technology.

This rulemaking (NPRM) is proposing to apply this installation requirement to those newly constructed or fully

replaced pipelines that arc greater-than­ or-equal-to 6 inches in nominal

diameter. PHMSA is also proposing regulations to improve pipeline operators' responses to large-volume, uncontrolled release events that may occur during the operation of certain onshore gas transmission, hazardous liquid, and carbon dioxide pipelines of particular diameters and in specific

locations.1 This NPRM would define a "rupture" event through certain metrics or observations, require operators of applicable lines to meet new regulatory standards to identify ruptures more quickly, respond to them more effectively, and mitigate their impacts. PHMSA's existing regulations reqnire that operators take several steps to reduce the risk of potential leaks and failures, inclnding testing and assessments, continuous monitoring of operations, and physical snrveys and patrols of their pipelines' rightͅ of-ways. Based on congressional direction, National Transportation Safety Board (NTSB) safety recommendations from accident investigations, recommendations from the Government Accountability Office (GAO), and PHMSA's analysis of incidents and

evolving technology, this rule proposes to define large-volume, uncontrolled releases of both natural gas and hazardous liquids as pipeline "ruptures" and proposes standards to mitigate those ruptures.

One such rupture occurred on July 25, 2010, in Marshall, Michigan, resulting in the spill of approximately 800,000 gallons of crude oil into the Kalamazoo River and approximately $1 billion in damages. The operator took 18 hours to confirm the pipeline ruptnre. Following confirmation of the rupture, the failed segment of the pipeline was immediately isolated using remote­ controlled valves.

Another incident occurred on September 9, 2010, in San Bruno,

1 For brevity, reference to "hazardous liquid pipelines" through the remainder of this NPRM will include carbon dioxido pipelines as well, unless otherwiSfi stipulated.

California, when a gas pipeline ruptured, causing a fire. This incident involved the uncontrolled release of natural gas for 95 minutes, severely hampering firefighting efforts, before the operator closed the mainline valves. The incident resulted in 8 deaths, 51 injuries requiring hospitalization, the destruction of 38 homes, damage to 70 other homes, and the evacuation of approximately 300 houses.

These two incidents are examples of release events where consequences can be significantly aggravated by some combination of missed opportunities by

operators, including: (1) Identifying that a rupture has occurred; (2) failing to take appropriate and prompt action(s) once a rupture has been identified, including calling 911 following the rnptnre, activating emergency response protocols, and notifying first responders

and pnblic officials; and (3) failing to promptly access and close available

segment isolation valves that would be most beneficial for mitigating the impact of the rupture.

Following those incidents, Congress issned the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 (2011 Pipeline Safety Act), which contained several mandates to improve pipeline safety. Section 4 of the 2011 Pipeline Safety Act requires PHMSA to issue regulations, if appropriate, requiring the use of automatic or remote-controlled shut-off valves, or equivalent technology, on newly constructed or replaced natural gas or hazardous liquid pipeline facilities.

PHMSA is proposing these regulations to improve operational practices related to rupture mitigation and to shorten rupture-segment isolation times by requiring operators of applicable lines to identify a rupture quickly, implement response procedures, and fully close pipeline mainline valves to terminate the uncontrolled release of commodity as soon as practicable. PHMSA is also requiring operators to install automatic shutoff, remote-controlled, or equivalent valves on newly constructed and entirely replaced pipelines to meet the section 4 mandate, PHMSA seeks comment from the public on these proposals,

Enbridge, the pipeline operator responsible for the incident near Marshall, Ml, had remote-control technology installed on the ruptured pipeline. However, a failure to identify the rupture within a short amount of time rendered the technology essentially useless. Therefore, PHMSA believes a regnlation requiring the installation of rupture-mitigating valves should be paired with a standard delineating when

an operator must identify a rupture and actuate those valves. PHMSA also believes that this standard will be most cost-effective when applied to onshore hazardous liquid and natural gas transmission pipelines of certain diameters in high-consequence areas [HCA), areas that could affect HCAs (for hazardous liquid pipelines), and Class 3 and 4 locations (for natural gas transmission pipelines),2 where a release could have the most significant adverse consequences on public safety or the environment.

In developing these proposed regulations, PHMSA considered other mandates in the 2011 Pipeline Safety Act, as well as NTSB safety recommendations that followed the San Bruno incident; 3 GAO recommendations on the ability of

operators to respond to commodity releases in HCAs; 4 technical reports

commissioned by PHMSA on valves and leak detection from Oak Ridge National Laboratory (ORNL) and Kiefner and Associates, respectively; 5 6 comments received on related topics through advance notices of proposed rulemaking (ANPRM); and information gathered at public meetings and workshops.

PHMSA believes this approach, as detailed in this NPRM, will help reduce the consequences of rnptures through

2 A gas pipeline's class location broadly indicates tbs levol of potontial consequences for a pipeline release based upon population density along the

pipeline. Class locations are determined as specified at § 192.5(a) by using a "sliding mile" that extends 220 yards on both sides of Urn centerline of a pipeline. The number of buildings within this sliding mile at a11y point during the mile's movement determines the class location for the entire mile of pipeline contained within the sliding mile. Class 1 locations contain 10 or fower buildings intended for human occnpancy, Class 2 locations contain 11 to 45 buildings, Class 3 locations contain 46 or more buildings, and Class 4 locations bave a prevalence of 4-or-more-story buildings.

3 "Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; Septembor 9, 2010; NTSB Accident Report PAR-11/01; Adopted August 30, 2011. https://www.ntsb.gov/investigations/ Acciden tReports/Rc ports IP AR1 101. pdf.

4 "Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response," Government Accountability Office Report to Congressional Committees, January 2013. https:llwww.gao.gov/nsr;ets/660/65140l1.pdf.

6 "Studies for the Requirements of Automatic and Remotely Conlrollod Shutoff Valves and Hazardous

Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety;" Oak Ridge National Labmatory; ORNL/TM-2012/411; October 31, 2012. httpr;://www.phmsa.dot.gov/sitcs/ phmsa.dot.gov/Jiles/docs/technicol-re.rnurces/ pi peHne/1 6701 /fin olvalvest udy. pdf.

(I "Leak Detection Study--DTPH56'-11-D- 000001;" Kiefner and Associates, Inc.; Final Report No. 12-173; December 10, 2012. littps://

1vw1v.phm.ÿa.dot.gov/sites/plm1so.dot.gov/Jilesl docs/technical-rnsou rcer;/pipeline/1 6691 /leak­ detection -study. pdf

7164 Federal Register I Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules

improving both rupture identification and rupture mitigation, including more rapid and effective isolation of failed pipeline segments.

B. Summmy of the Major P1·ovisions of the Prnposed Regulato1y Action

This NPRM will require the installation of automatic shutoff valves, remote-control valves, or equivalent technology, on all newly constructed or entirely replaced natural gas transmission and hazardous liquid pipelines that have nominal diameters of 6 inches or greater.7 For the purposes of this NPRM, PHMSA considers pipelines to be "entirely replaced" when 2 or more contiguous miles are being replaced with new pipe. PHMSA requests comments on this definition of "entirely replaced" in the context of the Section 4 valve installation mandate and whether it is reasonable or should be modified in the future, Additionally, for gas transmission pipelines, when a pipeline's class location changes and results in pipe replacement to meet the maximum allowable operating pressure (MAOP) requirements of the new class location, an operator would be required lo install or otherwise modify valves as necessary to comply with valve spacing requirements and the proposed rupture identification and mitigation requirements.

The NPRM also would establish Federal minimum standards for the identification of ruptures and the initiation of pipeline shutdowns, segment isolation, and other mitigative actions, which are designed to reduce the volume of commodity released due to a pipeline rupture and thereby minimize potential adverse safety and

environmental consequences, This NPRM also would establish standards for improving the effectiveness of emergency response. Specifically, the proposed rupture identification and mitigation regulations include: (1) Defining the term "rupture" as an event that results in an uncontrolled release of

a large volume of commodity that can be determined according to specific criteria or that has been observed and reported to the operator; (2) a requirement to establish procedures for responding to a rupture; (3) a requirement to declare a rupture as soon as practicahle but no longer than 10 minutes after initial

notification or indication; (4) a requirement to immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call

7"Nominal" pipo sizo is the standard size used to refer to pipe in non-specific terms and identifies the approximale inner diameter of the pipe with a non-dimensional number.

centers) for the jurisdiction in which the rupture is located; and (5) a requirement to respond to a rupture as soon as practicable by closing rupture­ mitigation valves, with complete valve

shut-off and segment isolation within 40 minutes after rupture identification.

The term ''rupture-mitigation valve,'' as it pertains to this proposal, means the specific valve(s) that tho operator would use to isolate a pipeline segment that

experiences a rupture-the applicable "shut-off segment" as those are specified in this rulemaking, These valves can be any combination of automatic shutoff valves (ASVs),

remote-control valves (RCVs), or equivalent technology. A "shut-off segment," for the purposes of this NPRM, is the segment of applicable pipe between the rupture-mitigation valves closest to the upstream and downstream endpoints of a high-consequence area, a Class 3 location, or a Class 4 location so that the entirety of these areas is

between rupture-mitigation valves. Multiple high-consequence areas, Class 3 locations, or Class 4 locations can be contained in a single shut-off segment, and all valves installed on a shut-off segment are rupture-mitigation valves. Additionally, operators would be required to perform post-accident reviews of any ruptures or other release events involving the closure of rupture­ mitigation valves to ensure these

proposed performance objectives are met and to apply any lessons learned system-wide. The new rupture mitigation requirements in this NPRM would take effect 12 months after the final rule is pnhlished.

In this NPRM, PHMSA is only allowing operators to install or use manual valves if they can demonstrnte to PHMSA that it would be economically, technically, or operationally infeasible to install or use an ASV, RCV, or equivalent technology. Examples of where an ASV, RCV, or equivalent technology might he infeasible inclnde locations that may have issues with communication signals, power sources, space for actuators, or physical security.

PHMSA is not proposing additional valve requirements for smaller diameter pipelines or leaks that don't meet the

proposed definition of rupture in this rulemaking. PHMSA is also not requiring leak detection equipment on gas transmission and distribution pipelines as specifically recommended by NTSB Recommendation P-11-10. Pursuant to the findings in the Kiefner Leak Detection study that is referenced later in this rulemaking, it is typically more challenging to detect smaller leaks in an operationally, technically, and

economically feasible manner. However, this proposed rule, for hath hazardous liquid and gas transmission pipelines,

requires the installation of pressure monitoring equipment at all rupture mitigation valves on both the upstream and downstream locations of the valve, which will help operators better detect ruptures and which can be used for leak detection.

PHMSA continues to address the effectiveness ofleak detection systems for other non-rupture type leaks through its rulemaking on the safety of hazardous liquid pipelines; ll research and development projects, including work ou external-based leak detection sensors and acoustic pipeline leak detection systems; 9 aud engagement iu new or updated standards being developed by standard developing organizations, including API recommended practices 1130 and 1175,1° The requirements in this NPRM of adding pressure detection and communication equipment at rupture mitigation valves are expected to drive further development and installation of leak detection technology and may help drive operators to make decisions to improve the capabilities of their leak detection systems to detect non-rupture­ type events.

C. Costs and Benefits

Consistent with Executive Order 12866, PHMSA has prepared an assessment of the benefits and costs of the NPRM, as well as reasonable alternatives. Per the Preliminary Regulatory Impact Analysis (PRJA),

PHMSA estimates the annual costs of the rule to be approximately $3.1 million, calculated using a 7 percent discount rate. The costs reflect the installation of valves on newly constructed and entirely replaced gas transmission and hazardous liquid pipelines, as well as incremental

programmatic changes that operators will need to make to incorporate the proposed rupture detection and

response procedures, PHMSA elected not to quantify the benefits of this rulemaking and instead discusses them qualitatively in the PRIA.

PHMSA is posting the PRIA for this proposed rule in the public docket. In the PRlA, costs are aggregated by compliance method to estimate total

11 https :/ /www .reg Li laliol!S.gov I docket ?D=P HMSA- 2010-0229.

9 Detnils on all of PHMSA's leak detection research and development projects can be found nt: J1ttps://p1·imis.pl1msa.dot.govlmat1ixl PljQuMy.rdm?text1==1eak&btn==Madern+Searcli.

10 Computational Pipeline Monitoring for Liqnids and Pipolino Leak Detection Program Management, respectively.

Federal Register/Vol. 85, No. 25/Thursday, Februar·y 6, 2020/Proposed Rules 7165

costs, by year, for the baseline and NPRM. The incremental effect of this rulemaking is estimated by taking the difference in total costs relative to the baseline. Costs are then aggregated across all years in the analysis period and annualized.

II. Background

A. General Authority

Congress has authorized Federal regulation of the transportation of gas and hazardous liquids by pipeline in the Pipeline Safety Laws (49 U.S.C. 60101 et

seq.), a series of statutes that are administernd hy PHMSA. Congress established the current framework for regulating pipelines transporting gas in the Natural Gas Pipeline Safety Act of 1968 (Pnb. L. 90-481) and the safety of hazal'dous liquid pipelines in the Hazardous Liquid Pipeline Safety Act of 1979 (Pub. L. 96-129). These laws give PHMSA the authority and responsibility to develop, prescribe, and enforce minimum Federal safety standards for the transportation of gas and hazardous liquids by pipeline, PHMSA prescribes and enforces comprehensive minimum safety standards for the transportation of gas and hazardons liquids by pipeline in 49 Code of Federal Regulations (CFR) parts 190-199. Among those standards, PHMSA has codified safety standards for the design, construction, testing, operation, and maintenance of gas and hazardous liquid pipelines in 49 CFR part 192, Transportation of Natural and Other Gas by Pipeline, and 49 CFR part 195, Transportation of Hazardous Liquids by Pipeline.

Part 192 prescribes minimum safety requirements for the transportation of gas by pipeline, including ancillary facilities and within the limits of the outer continental shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331). Part 195 prescribes minimum safety requirements for pipeline facilities nsed in the transportation of hazardous liquids or carbon dioxide, including pipelines on the Outer Continental Shelf,

fl. Major Pipeline Accidents

Although transmission pipelines are generally considered to be a very safe means of transporting natural gns and hazardous liquids,11 they can experience largeͯ volume, uncontrolled

releases that can have severe consequences. For example, and

11 Enorgy products being shipped through the nation's 2.7 million miles ofpipelinos roach their destinations without incident 99,997 percent of the timo. https:llwww.phmsa.dot.gov/sites/ pl1msa. dot .gov/files/ docslnews/69671 /aopl-api­ speecb .pdf.

according to PHMSA hazardous liquid pipeline accident reports from 2006 to 2016, there were 91 reported incidents on pipelines within HCAs that would have been reported as "ruptures" per this proposed rulemaking and would have triggered this NPRM's rupture­ mitigation response provisions. Such accidents can be aggravated by some combination of: Missed opportunities hy tho operator to identify that a rupture has occurred; failure of operating personnel to take appropriate action(s) once a rupture is identified; delays in accessing and closing available segment isolation valves; and an inability to qnickly close isolation valves that wonld have the most significant impact in mitigating the consequences of a

rupture. Typically, those types of incidents (i.e., failure events that result in rapidly occurring, lnrge-volume releases) have been the most serious in terms of monetary and environmental damages and safety consequences-the aforementioned 91 hazardous liquid

"ruptures" resulted in $1.21 billion dollars in damage and 88,506 bbls spilled. The Marshall, Ml, and San Bruno, CA, accidents are examples of failnre events that resulted in rapidly occurring, large-volume releases on high-pressure, large-diameter pipelines.

The intent of this NPRM is to improve operational practices that in turn will improve rupture mitigation and shorten rupture isolation times for certain onshore gas transmission and hazardons liqnid pipelines. "Rupture isolation time," as it is discussed in this NPRM, is the time it takes an operator to identify a rupture, implement response

procedures, and fully close the appropriate mainline valves to terminate the uncontrolled flow of commodity from the ruptured pipeline segment.

In accident investigations, PHMSA and the NTSB have identified issues relating to the timeliness of rupture identification and the appropriateness and timeliness of operators' responses to ruptures. Typically, no single aspect contributes to the deficiencies in rupture identification and response. Instead, there were multiple contributing factors associated with the technology, equipment, procedures, and hnman elements that resulted in inadequate rupture identification and response efforts. In some incidents, certain aspects of an operator's rupture identification or response efforts appeared adequate, bnt other issues, such as delayed access to isolation valves, resulted in an inadequate response overall, For instance, in the incident near Marshall, MI, the pipeline operator had in place leak detection

systems (LDS) and supervisory control and data acquisition (SCADA) systems that notified the controller of a potential rupture within minutes of the actual event, but issues related to the operator's procedures, training, and

personnel response resulted in an excessive amount of time-18 hours­ before the operator confirmed the rupture and initiated mitigative actions. In the incident in San Brnno, CA, the operator effectively identified there was a leak through LDS or SCADA systems but look 95 minutes to isolate the gas pipeline rupture, which caused the fire to continue to burn unabated. The NTSB noted that the operator, Pacific Gas & Electric (PG&E), lacked a detailed and comprehensive procednre for responding to largeͰscale emergencies such as a transmission pipeline break, and that the use of ASVs or RCVs would have reduced the amount of time taken to stop the flow of gas.

Prior to these incidents, the NTSI3 noted similar issues related to rupture response in its report on an incident occurring on March 23, 1994, in Edison Township, New Jersey.1 .i In the Edison incident, the operator took nearly 2½ hours to stop the flow of gas. The fire that followed the rupture destroyed 8 buildings, caused the evacuation of approximately 1,500 apartment residents, and caused more than $25 million worth of property damage. The director of the operator's Gas Control division stated in the NTSB accident report that the operator could typically notify employees to close valves within 5 to 10 minutes after identifying a rupture and that the time it took to close a valve depended on the employee's travel time to the valve site. In his experience, he found that employees could usually arrive at a valve site within 15 to 20 minutes, bnt in some instances it took more than 1 hour for

employees to arrive at certain valves after being dispatched. In its accident report, tho NTSB concluded that the lack of automatic- or remote-operated valves on tho ruptured line prevented the company from promptly stopping the flow of gas to the failed pipeline segment, which exacerbated damage to nearby property. Subsequently, the NTSB recommended to PHMSA's predecessor, the Research and Special Programs Administration (RSPA), that it expedite establishing requirements for installing automatic- or remote-operated mainline valves on high-pressure

12National Transportation Safety Board Pipoline Accident Report; Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire; Edison, New Jersey; March 23, 1994. https:// 1v1v1v.ntsb.gov/i11vestigations/AccidentReports/ Rep01·ts/P AR9501.pdf.

7166 Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules

pipelines in nrban and environmentally sensitive areas to provide for rapid shutdown of foiled pipeline systems (P- 95-1). As recognized hy Congress and several other stakeholders, these high­ consequence rupture events deserve special consideration and regulatory treatment. Accordingly, PHMSA is proposing a combination of standards that focus on achieving the congressional objective of more limely rupture detection and mitigation in important areas while also requiring a broader installation of rupture­ mitigating valves on newly constructed and entirely replaced pipeline infrastructure.

C. National Transportation Safety Board Recommendations

On August 30, 2011, the NTSB issned its report on the gas transmission pipeline accident that occmred in San Bruno, CA, on September 9, 2010Y1 In its report, the NTSB issued safety recommendations P-11-8 through P- 11-20 lo PHMSA; safety recommendations P-11-24 through P- 11-31 to PG&E, the operator of the failed line; and several recommendations to other entities, including the Governor of the State of California, the California Public Utilities Commission (CPUC), the American Gas Association (AGA), and the Interstate Natural Gas Association of America (INGAA). NTSB safely recommendations P-11-9, P-11-10, and P-11-11 recommended that PHMSA require operators to immediately and directly notify the appropriate pnblic safety answering point (9-1-1 emergency call centers) in the communities and jnrisdictions where a pipeline rupture is indicated; equip their SCADA systems with tools, including leak detection systems and appropriately spaced flow and pressme transmitters along covered transmission lines, to identify leaks (and ruptures); and require automatic shut-off valves (ASV) or remote-control valves (RCV) be installed in HCAs and Class 3 and 4 locations with the valves spaced considering risk analysis factors, respectively .14

PHMSA determined that, although the NTSB directed these recommendations to onshore gas transmission pipelines in response to a natural gas transmission accident, certain aspects of these recommendations are also applicable to

l:t NTSB/PAR-11/01, PB2011-91G501, Pacific Gas a/ld Electric Company Natural Gas Tra11smissio11 Pipeline R11pl111'e and Fire.

14 NTSB Safety Recommendation addrossed to PHMSA; September 26, 2011; https://www.ntsb.gov/ safely J.,;af ety-recslrccletters/P-11-00fl-020. pdf

hazardous liquid pipelines, particularly as they relate to ruptures.

D. Advance Notices of Proposed R11lemaking

PHMSA puhlished two ANPRMs seeking comments regarding the

revision of several topic areas in the Pipeline Safety Regulations that are applicable to the safety of hazardous liquid pipelines (October 18, 2010; 75 FR 63774) and gas transmission pipeliues (August 25, 2011; 76 FR 53086).15 This NPRM addresses issues that were raised in the ANPRMs related to rupture detection and mitigation, inclnding leak detection, valve spacing, valve installation, and method of valve actuation.

In response to tho questions in the ANPRMs, a variety of parties representing interests from the natural gas and hazardous liqnid industries, citizen groups, regulators, and local governments, provided comments. PHMSA considered these comments as discussed in Section III of this NPRM. Separately, PHMSA is addressing several other topics considered in the hazardous liquid and gas transmission ANPRMs, specifically in NPRMs titled "Safety of Hazardous Liqnid Pipelines" (October 13, 2015; 80 FR 61610) and "Safety of Gas Transmission and Gathering Pipelines" (April 8, 2016; 81 FR 20722).

E. Pipeline Safety, Reg11lato1y Certainty, and Job Creation Act of 2011 and Related Studies

Pnblic Law 112-9, known as the ''Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011" (2011 Pipeline Safety Act), was enacted on January 3, 2012. Several of the 2011 Pipeline Safety Act's statutory requirements relate directly to the topics addressed in the ANPRMs, which have an impact on this proposed rulemaking. This NPRM is, in part, a response to the mandates of section 4 and section O of the 2011 Pipeline Safety Act.

i. Section 4-Anlomatic and Remote­ Controlled Shut-Off Valves

Section 4 of the 2011 Pipeline Safety Act directs the Secretary of Transportation (Secretary), if

appropriate, to require by regulation the use of ASVs or RCVs, or eqnivalent

technology, where it is economically, technically, and operationally feasible, on hazardons liquid and natural gas transmission pipeline facilities that are constructed or entirely replaced after

15See ivw1v.regulations.gov, dockets PHMSA- 2010-0229 and PHMSA-2011-0023, respectively, for both the ANPRMs and NPRlvfs.

the date on which the Secretary issues the final rule containing such requirements. PHMSA is proposing to address this mandate by establishing the minimnm standards described in this

NPRM. These standards were also developed in consideration of NTSB Recommendations P-11-10 and P-11- 11, the GAO Report GAO-13-168, "Better Data and Guidance N ceded to Improve Pipeline Operator Incident Response," 16 and ORNL Report/TM- 2012/411, "Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines VVith Respect to Public and Environmental Safety," which was performed in response to the 2011 Pipeline Safety Act.17

a. GAO Report GAO-13-168

Section 4 of the 2011 Pipeline Safety Act also required the development of a stndy by the Comptroller General on the ability of pipeline operators to respond to a hazardous liquid or gas release from a pipeline segment located in an HCA. This study was pnblished by the GAO in January 2013 and recommended PHMSA take the following two actions:

1. Improve the reliability of incident response data to improve operators' incident response times, and use this data to evaluate whether to implement a performance-based framework for incident response times, and

2. Assist operators in determining whether to install automated valves by using PHMSA's existing information

sharing mechanisms to alert all pipeline operators of inspection and enforcement guidance that provides additional information on how to interpret regulations on automated valves, and share approaches used by operators for making decisions on whether lo install automated valves.

The GAO report noted that defined performance-based goals, established with reliable data and sound agency assessments, could result in improved operator response to incidents, with ASV and RCV installation and use being one of the determining factors. The GAO further noted that, although the cnrrent PHMSA regulations for incident response and the installation and use of ASVs and RCVs are performance-based, they are very general, currently requiring operators to respond to incidents in a "prompt and effective

rn Published January 2013; 11'1\111'.regulatioJls.gov (Docket ID PHMSA-2013·-0255--0002).

17 Published October 31, 2012: JVJVw.regulalions.gov (Docket ID PHMSA-2013- 0255-0004).

Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7167

manner," 10 and requiring operators to install ASVs, RCVs, or emergency flow restricting devices (EFRD) if an operator determines, through risk analysis, such valves are necessary to protect HCAs,HI

More clearly defined goals can help operators identify actions that could improve their ability to respond to certain types of incidents consistently and promptly, though identical incident response actions are not appropriate for all circumstances due to pipelines having variable locations, equipment needs, configurations, and operating conditions. PHMSA agrees with the GAO's conclusions that a more specific standard, in conjunction with carefully selected requirements, could be more effective in improving incident response times, particularly when ruptures are involved.

The GAO report also concluded that the primary advantage of installing and using automated valves is that operators can respond more quickly to isolate the affected pipeline segment and reduce the amount of commodity released.

Although the report suggested that using automated valves can have certain disadvantages, including lhe potential for accidental closures, which makes it

appropriate for operators to decide whether to install automated valves on a case-by-case basis, the report recognized that a faster incident response time could reduce the amount of property damage from secondary fires {after an initial pipeline rupture) by allowing fire departments to extinguish the fires sooner, In addition, for hazardous liquid pipelines, a faster incident response time could result in lower costs for environmental remediation efforts and less commodity loss.

PHMSA applied these principles and the GAO's findings and recommendations in developing the standards proposed in this NPRM. The proposed amendments in this NPRM

would also include new, specific, post­ accident review requirements in §§ 192.617(a) and 195.402(c)(5)(i) and (ii). Operators would make those post­ accident reviews available for PHMSA to inspect, and PHMSA could use lhose reviews in disseminating lessons learned to other operators and to better inform future rulemakings. The GAO report may be reviewed at http://

www.regulations.gov by searching for Docket No. PHMSA-2013-0023.

111 For natural gas and hazardous liquid pipelines, §§ 192.G15(a)(3) and 195A02(e)(2), respectively.

19Requirements for ASVand RCV installation aro at§ 192.935(c), and requircmonts for EFRD installation are at § 195.452(i)( 4).

b. ORNL Report ORNL/TM-2012/411

In March 2012, PHMSA requested assistance from ORNL to perform a study to address the issues outlined in

Section 4 of the 2011 Pipeline Safety Act and those raised by the NTSB in its

accident report for the September 9, 2010, Sau Bruno natural gas pipeline incident, The ORNL study assessed the effectiveness of valve-closure swiftness in mitigating the consequences of natural gas and hazardous liquid pipeline releases on public and environmental safety. It also evaluated the technical, operational, and economic feasibility and potential benefits of installing ASVs and RCVs in newly constructed and fully replaced pipelines. Tho study concluded that:

1. In general, installing ASVs and RCVs on newly constructed and fully replaced natural gas transmission and hazardous liquid pipelines is technically feasible, provided sufficient space is available for the valve body, actuators, power source, sensors and related electronic equipment, and personnel required to install and maintain the valve; and is operationally feasible, provided the communication links between lhe RCV site and the control room are continuous and reliable.

2, There is evidence that it is economically feasible to install ASVs and RCVs on newly constructed and fully replaced natural gas transmission and hazardous liquid pipelines and the benefits would exceed the costs for the release scenarios considered in the study. However, it is necessary to consider site-specific variables in determining whether installing ASVs or RCVs on nowly constructed or fully replaced pipelines is economically feasible iu a particular situation.

3. Installing ASVs and RCVs on newly constructed and fully replaced natural gas and hazardous liquid pipelines can be an effective strategy for mitigating potential fire consequences resulting from a release and subsequent ignition. Adding automatic closure capability to valves on newly constructed or fully replaced hazardous liquid pipelines can also be an effective strategy for mitigating potential socioeconomic and environmental damage resulting from a release that does not ignite.

4. For hazardous liquid pipelines, installing ASVs and RCVs can be an effective strategy for mitigating potential

fire damage resulting from a pipe opening-type breaks 20 and subsequent ignition, provided the leak is detected

20 A broak in the pipeline that involves the opening of the pipe in either the circumferential or longitudinal direction.

and the appropriate ASVs and RCVs close completely so that the damaged pipeline segment is isolated within 15 minutes after the break.

PHMSA used the conclusions of the ORNL Report in developing this NPRM and as a basis for proposing to implement standards for valve installation per Section 4 of the 2011 Pipeline Safety Act. The report may be reviewed at http://www.regulations.gov by searching for Docket No. PHMSA- 2013-0255-0004.

ii. Section SΌLeak Detection

Section 8 of the 2011 Pipeline Safety Act required the Secretary to submit to Congress a report on leak detection systems (LDS) utilized by operators of hazardous liquid pipeline facilities, including transportation-related flow lines, and to establish technically,

operationally, and economically feasible standards for the capability of leak

detection systems to detect leaks.

PHMSA responded to the 2011 Pipeline Safety Act's Section 8 mandate by contracting with Kiefner and Associates, Inc. to prepare a leak detection study. The Kiefncr study examined LDS used by operators of hazardous liquid and natural gas transmission pipelines and included an analysis of the technical limitations of current LDS, the ability of the systems to detect ruptures and small leaks that are ongoing or intermittent, and what can be done to foster development of better technologies. It also reviewed the practicality of establishing technically,

operationally, and economically feasible standards for LDS capabilities. The study addressed five tasks defined by PHMSA:

• Assess past incidents to determine if additional LDS may have helped to reduce the consequences of the incident;

• Review installed and currently available LDS technologies, along with their benefits, drawbacks, and their retrofit applicability to existing pipelines;

• Study current LDS operational practices used by the pipeline industry;

• Perform a cost-benefit analysis of deploying LDS on existing and new pipelines; and

• Study existing LDS standards to determine what gaps exist and if additional standards are needed to cover LDS over a larger range of pipeline categories.

The authors of the Kiefner study were tasked only to report data and technical and cost aspects of LDS. Although the Kiefner study did not provide any specific conclusions or

recommendations related to leak

7168 Federal Register/Vol. 85, No, 25/Thursday, February 6, 2020/Proposed Rules

detection system standards, its content did inform this NRPM, acknowledging that pressure/flow monitoring (leak detection techniques) will consistently and reliably catch large volume, uncontrolled release events such as ruptures. Therefore, PHMSA has proposed that valves designated as rupture-mitigation valves for this rulemaking be outfitted with equipment or other means to monitor valve status, commodity pressures, and flow rates. Also, the report noted that operator procedures may have allowed ignming alarms, restarting pumps, or opening valves during large releases.

The standard PHMSA is proposing in this rulemaking intends to reduce the frequency of these errors by requiring an operator to determine a rupture is occurring within 10 minntes following the first notification to the operator or following specific criteria involving throughput. PHMSA is considering alternate timeframes for rupture confirmation for this rulemaking. PHMSA notes that a 10-minute confirmation standard would be consistent with certain industry practices. For example, in its report following the incident near Marshall, MI, the NTSB noted that the operator had procedures in its operations manual that restricted the operation of a pipeline for longer than 10 minutes when the pipeline was operating under unknown circumstances. This procedure was adopted following a 1991 rupture and release by the samo operator. PHMSA welcomes comments from stakeholders on the feasibility, reasonableness, and adequacy of the proposed 10-minute ruptnre confirmation standard.

The proposed accident review following these rnptures can also help drive operators to implement lessons learned system-wide and assist PHMSA in providing industry-wide gnidance regarding overarching performance issues. The report may be reviewed at http:/ !www.regulations.gov by searching for Docket No. PHMSA-2013-0018.

PHMSA is not proposing specific metrics to address smaller, non-rupture­ type leaks in this rulemaking. PHMSA is also not proposing to require leak detection equipment on gas transmission and distribution pipelines as expansively as recommended by NTSB recommendation P-11-10, which recommended that all operators of natural gas transmission and distribution pipelines equip their supervisory control and data acqnisitian systems with tools to assist in recognizing and pinpointing the location of leaks, including line breaks. Pursuant to the findings in the Kiefner

Leak Detection stndy, it is typically more challenging to detect smaller leaks in an operationally, technically, and economically feasible manner. Further, the report notes that LDS with the same technology, when applied to two different operating pipeline systems, can have very different results. In short, one size does not fit all, and determining a reasonable, minimum Federal standard for safety comes with several challenges. However, this NPRM, for both onshore hazardous liquid and gas transmission pipelines, would require the installation of pressure monitoring equipment at a11 ruptnrc mitigation valves on hath the upstream and downsb·eam locations of the valve. This requirement incorporates an aspect of NTSil Recommendation P- 11-10 that will help operators to better detect ruptnres, which should drive further development and installation of leak detection technology, and may help drive operators to make decisions to improve the capabilities of their cnrrent leak detection systems to detect non­ rupture type events. PHMSA continnes to address the effectiveness ofLDS for other non-rupture type leaks through a rnlemaking,21 engagement in new OT updated standards being developed by

standard developing organizations, and through the development of research and development projects.22

F, PHMSA 2012 R&D Forum, "Leak Detection and l\1iligation"

PHMSA sponsored a workshop on leak detection and expanded EFRD use, in Rockville, MD, on March 27-28, 2012. Additionally, a Government and Industry Pipeline Research and Development (R&D) Fornm was held in Arlington, VA, an July 18-19, 2012.23 PHMSA periodically holds 2-day R&D forums to generate a national research agenda that fosters solntions for the many challenges facing pipeline safety and environmental protection. The R&D fornm allowed public, government, and industry pipeline stakeholders to develop a consensus on the technical gaps and challenges for future research. It also enabled stakeholders to discnss

21 Pipelino Safoty: Safety of Hazardous Liquid Pipolinos; 00 FR 61609; October 13, 2015.

n Improving Leak Detection System Design Redundancy and Accmacy, DTPH56-14-I-I-00007 (End: April 2017); Emissions Quantification Verification Process, DTPI-I5615T00012L (End: December 2017); Framework for Verifying and Validating the Performance imd Viability of External Leak Detoction Systems for Liquid and Natural Gas Pipelines, DTPH5615T00004L (Encl: Murch 2010)

23 https:l /primis.phmsa.dot.gov/meetings/ MtgHome.mtg?mtg=77. For details on tbo meeting, please see tho summary report at l1ttps:I/ prim is.pl1mso. dot .gov/rd /mtgs/0 71 B 12/2012 _RD_ ForumSummoryReport.pdf.

ways to reduce duplication of programs, consider ongoing research efforts, and leverage resources to achieve common objectives. Participants discussed the development of leak detection technology for all pipeline types (from any deployment platform) and the capabilities and limitations of current leakΗdetection technologies. A working group convened for tho meeting for the topic of leak detection identified four gaps for future research, which were: (1) To reduce false alarms ofleak detection systems; (2) leak detection technology, standards, and knowledge for new and existing systems; (3) smart system development; and { 4) mobile-based leak detection system testing.

III. Proposed Rupture Identification

and Mitigation Actions and Analysis of ANPRM Comments

In response to the congressional mandates contained in the 2011 Pipeline Safety Act, recommendations from the NTSil and GAO, comments received to both ANPRMs, discussions at PHMSA's public workshops, and the results of the studies and analyses described above, PHMSA is proposing standards for valve installation, ruptnre recognition and timely mitigation, and valve shut-off and location requirements for segment isolation. These actions are intended to minimize consequences from ruptured pipeline segments and improve the effectiveness of emergency response.

The proposed valve installation requirement applies to all newly constrncted and entirely replaced gas transmission and hazardons liqnid pipelines with nominal diameters of 6 inches or greater. For the purposes of this rulemaking, PHMSA proposes to define "entirely replaced" pipelines as those pipelines where 2 or more

contiguous miles are being replaced with now pipe. Operators of these lines would be required to install antomatic shutoff valves, remote-control valves, or equivalent technology at the valve spacing intervals or locations already specified in the current regulations. In the case of "entirely replaced" pipelines, valves that are directly associated with or are otherwise impacted by the replacement project would need to be upgraded to automatic shutoff, remote control, or eqnivalent valve technology. In the May 1, 1998, final order to Viking Gas Transmission,24 PHMSA notes that § 192.13(b) states "no person may operate a segment of pipeline [ ... J that is replaced, relocated, or otherwise

24 In the Motte1· of Viking Gas TraMmission, Final Order, C.P.F. No. 32102 (May 1, 1998).

Federal Register/Vol. 85, No, 25 /Thursday, Fehruary 6, 2020 /Proposed Rules 7169

changed [, , .], unless the replacement, relocation, or change has been made according to the requirements in [part 192]." In that final order, PHMSA stated it expected the operator to ensure that any future pipeline replacements comply with the valve spacing requirements at§ 192.179. Therefore, even if a replaced segment does not have a valve, operators would need lo ensure that the replaced segment meets the spacing requirements at§ 192.179 and would need to ensure, per this rulemaking, that any valves installed for compliance also meet the standard of being automatic shut-off, remote­ control, or equivalent technology, In the case of hazardous liquid pipelines, maximum valve spacing mileages are not specified under the current regulations, and PHMSA has proposed valve spacing for those pipelines constructed following the issuance of the final rule. The valves insta11ed per the NPRM's provisions for both gas transmission and hazardous liquid pipelines would also be subject to the 40Ώminute rupture-mitigation closure requirement and the monitoring requirements of the rulemaking,

These proposed rupture identification and mitigation regulations include: (1) Defining the term "n1pture" as a significant breach of a pipeline that results in a large-volume, uncontrolled release of commodity that can be determined according to specific criteria or that has been observed and reported to the operator; (2) a requirement to establish procedures specifically for responding to a rupture based on the

definition; (3) a requirement to declare a rupture as soon as practicable but no longer than 10 minutes after initial notification or indication; (4) a requirement to immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call centers) for the jurisdiction in which the rupture is located; and 5] a requirement to respond to a rupture as soon as practicable by closing rupture­ mitigation valves, with complete valve shut-off and segment isolation within 40 minutes after rupture identification. Rupture identification occurs when a rupture is reported to, or observed by, pipeline operating personnel or a controller,

The term "rupture-mitigation valve," as it pertains to this proposal, means the specific valve(s) that the operator would use to isolate a pipeline segment that experiences a rupture-the applicable "shut-off segment" as specified in this NPRM. These valves can be any combination of ASVs, RCVs, or equivalent technology upon review by PHMSA, and they would be required to

comply with the proposed new rupture mitigation timing, testing, communication, maintenance, and inspection requirements of this NPRM. PHMSA is also proposing operators

periodically verify, through drills, that their rupture-mitigation valves can reliahl y meet the standard outlined above and that any communications equipment necessary for valve actuation functions as needed. Additionally, operators would be required to perform post-accident reviews of any ruptures or other release events involving the closure of rupture-mitigation valves to ensure these proposed performance objectives are met and that any lessons learned can be applied system-wide.

Regarding the proposal for immediately and directly notifying the appropriate public safety answering point (PSAP) for the jurisdiction in which the rupture is located, per PHMSA's Advisory Bulletin published on October 11, 2012 (77 FR 61826), PHMSA believes that immediate communication should be established between pipeline facility operators and PSAP staff when there is any indication of a pipeline rupture or other emergency condition that may have a potential adverse impact on public safety or the environment. PHMSA recommends that pipeline facility operators ask their applicable PSAP(s) if there are any other reported indicators of possible pipeline emergencies such as odors, unexplained noises, product releases, explosions, fires, etc., as these reports may not have been linked to a possible pipeline incident by the callers contacting the

9-1-1 emorgency call center. This early coordination will facilitate the timely and effective implementation of the pipeline facility operator's emergency response plan and coordinated response with local public safety officials,

PHMSA is not proposing specific metrics to address smaller, non-rupture­ type leaks in this NPRM. PHMSA is also not proposing to require leak detection equipment on gas transmission and distribution pipelines as specifically recommended by NTSB recommendation P-11-10. Pursuant to the findings in the Kiefner Leak Detection study, it is typically more challenging to detect smaller leaks on pipelines in an operationally, technically, and economically feasible manner. However, this NPRM, for both hazardous liquid and gas transmission pipelines, requires the installation of pressure monitoring equipment at all rupture mitigation valves on both the upstream and downstream locations of the valve, which will help operators to better detect ruptures and which can be used for leak detection when leak

detection technology becomes further developed. PHMSA continues to address the effectiveness of leak detection systems for other non-rupture type leaks through other rulemakings, R&D projects, and engagement in new or updated standards being developed by standard developing organizations.

The rupture-mitigation provisions of this NPRM, and the related comments to the major topic areas of this NPRM, ai·e discussed below:

A. Definition of Rupture

Section 4 of the 2011 Pipeline Safety Act requires PHMSA to, if appropriate, issue regulations requiring the use of ASVs or RCVs, or equivalent technology, where economically, technically, and operationally feasible, on newly constructed or entirely replaced transmission pipeline facilities. PHMSA notes, though, that there may be little benefit to the installation of these valves if there is not a threshold requiring their use to mitigate the consequence of large releases.

While some individual operators have installed ASVs and RCVs in response to recent high-profile incidents, and existing regulations require operators to consider these types of valves as additional mitigative measures in HCAs, the continued occurrence of incidents with tmnecessarily slow response times suggests that operators may not be fully accounting for the social costs of unmitigated large-scale release events in their risk analysis, emergency planning, and valve automation decisions. PHMSA is proposing a new definition for the term "rupture" for both natural gas and hazardous liquid pipelines in parts 192 and 195, respectively, that operators must properly identify and subsequently take mitigative action against as proposed in this NPRM.

The term "rupture," as defined and applied in these proposed regulations, is meant to encompass any type oflarge­ volume, rapidly occurring, and uncontrolled release or failure event. Ruptures would include events that have rupture-like characteristics in terms of pressure and flow profiles, including but not limited to failures due to mechanical punctures, line breaks and other large-scale failures, seam splits, large through-wall cracks, sheared lines due to natural or other outside force damage, and valves inadvertently left open.

A rupture, as defined in this NPRM, would include any of the fo1lowing events that involve an uncontrolled release of a large volume of product over a short period of time: An unanticipated or unplanned pressure loss of 10

7170 Federal Register/Vol. 85, No, 25 /Thursday, February 6, 2020 /Proposed Rules

percent or more, occurring within a time interval of 15 minutes or less (with certain specific exceptions relevant to gas and liquid pipelines); an unexplained flow-rate change, pressure change, instrumentation indication, or equipment function; and an apparent large-volume, uncontrolled release of gas or a failure observed by operator personnel, the public, or public authorities. The term "rnptnre" as defined in this NPRM is only applicable as it would pertain to the proposed regulations in parts 192 and 195 and

should not be confused with the term "rupture" as it is utilized in other PHMSA applications, such as in incident and accident reporting forms

and other general PHMSA documents and records, For the purposes of those other applications, operators should consult the instructions for those forms to find the definition of "rupture," as it will be distinct from the term's proposed use in parts 192 or 195 per this rulemaking. PHMSA welcomes comment on this proposed definition of rupture and the usages of the term as they are proposed.

Although there are key differences in the behavior of gas pipeline ruptures and hazardous liquid pipeline ruptures, prompt identification, rapid system shutdown, and segment isolation are objectives common to both. Both types of ruptures have increased risks of adverse consequences as the time lengthens for both system shutdown and segment isolation. In the case of hazardous liquid pipelines, the volume of product released increases and spreads further over the surrounding terrain or in water as response and isolation times am prolonged, which significantly increases the potential for adverse consequences. As it can take an area affected by a hazardons liquid spill months or even years to be restored to a pre-accident state, limiting the amount of product released and the size of the affected area are of great importance.

For gas pipelines, a rupture results in a sudden release of energy that is sustained for longer periods of time even after the system is shut down, as the pressurized gas expands into the atmosphere and remains in relative

proximity to the failure site in most cases. When gas ruptures ignite, Urn length of time that the gas pipeline is not shut down and isolated leads to consequences, such as fires, that may otherwise be containable but spread outward and cause significant additional damage beyond the immediate impact zone.

In both cases, the quick isolation of a ruptured segment does not significantly alter the immediate impact of the

rupture even though the extended consequences can be significantly reduced.25 Therefore, this rulemaking is expected to drive improvement in rupture response and isolation times to reduce a rupture's extended consequences.

The rupture-mitigation requirements of any final rule that are based on the new rupture definition wonld take effect 12 months after the rulemaking becomes effective, and the definition itself would be incorporated with the other definitions for parts 192 and 195 in § 192,3 for onshore gas transmission

pipelines and in§ 195.2 for onshore hazardous liquid pipelines, respectively.

B. Accident Response and Mitigation Measures

i. Installing RCVs and ASVs

Several operators and industry trade gronps, including INGAA, AGA, American Public Gas Association

(APGA), Atmos, MidAmerican, Dominion East Ohio, and TransCanada, noted in the ANPRM that installing RCVs and AS Vs will not prevent incidents and that existing requirements allow for safe and reliable service. Chevron commented that operators should have the flexibility to select the most effective measures based on specific locations, risks, and conditions of the pipeline segment. PHMSA notes that, following the San Bruno incident, PG&E rapidly installed ASVs where

possible and stated there was sufficient basis to deploy such valves; according to a CPUC press release, the workplan it approved for PG&E would install 228

automated shut-off valves from 2012- 2014,26 21 In comparison, in 2006, PG&E concluded that most of the damage from a rupture would take place in the first

30 seconds before shut-off valves could stop the flow of gas.20 Gas transmission operators have previously cited a Gas Research Institute study from 1998 as

25 O[lk Ridge National Laboratory; "Studies for the Requirements of Automatic []IJd Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines with Respect lo Public and Environmental Safety:'' ORNL/TM-2012/411; October 31, 2012; Section 5, pgs. 175-186.

26Carey and Rogars. 2011. PG&E officials grillod about automatic shut eff valves. Silicon Valley MercuryNews,com, l1ttp:/lwww.merc11rynews.com/

san-bnmo-ffre/ci _ 17510209?nclick _ check"'1, posted 3/1/11. 27California Public Utilities Commission. 2012. "CPUC Approves Pipeline Safety Plan for PG&E; Increases Whistleblower Protections.'' http:// docs.cpuc.ca.gav/PublishedDocs/Pub]ished/G00D/ M040/K531 /40531580.PDF

28Cnrey and Rogers. 2011. PG&E officials grillod about automatic shut off valves. Silicon Valley MercuryNews.com, http://www.mercwyne1\ls.com/ san-bruno-ffre/ci _17510209?nclick _ cl1eck=1, posted 3/1/11.

the basis for concluding that the installation of RCVs is not cost-effective .since, in most cases, injury or death occurs so near to the time of pipeline rupture that RCVs may not respond quickly enough. A PG&E internal memorandum from 2006 (subsequently released to the pnblic) documenting its consideration of installing ASVs and RCVs on lines pointed to this study when concluding that the use of an ASV or RCV as a prevention and mitigation measure in an HCA wonld have "little or no effect on increasing human safety or protecting properties," and did not recommend using either as a general mitigation measure.29

However, the NTSB investigation of the San Bruno incident and research by OH.NL suggests there are real benefits to more rapid valve closure due to faster emergency response. As the NTSB stated, the total heat and radiant energy released by the burning gas was directly

proportional to the time gas flowed freely from the ruptured pipeline. Because the operator took 95 minutes to stop the flow of gas and isolate the rupture, the natural gas-fed fire continued to ignite homes and vegetation, contributing to the extent and severity of property damage and increasing the life-threatening risks to

residents and emergency responders. It wasn't until 95 minutes after the rupture that firefighters could .safely approach the rupture site and begin containment efforts due to the intensity of the fire. Firefighting continued for 2 days after the flow of gas stopped, and over 900 emergency responders were deployed, The use of ASVs or RCVs would have reduced the amonnt of time taken to stop the flow of gas and would have shortened the time the site was inaccessible to emergency responders.

Additionally, studies have indicated that a prolonged gas-fed fire leads to increased property damage, including

two separate studies from the Gas Research Institnte,80 as well as a 1999 study from RSPA slating that RCV use could reduce property damage, reduce public disruption of product supply, reduce damage to other utilities, and allow emergency responders faster access to the accident site.81

2n NTSB Accidont Roport; NTSB/PAR-11/01; PG&E Natural Gas Transmission Rupture and Fire; San Bruno, California; September 9, 2010; Pgs. 56- 57. :wM, Stephens, "A Modal for Sizing High Consequence Areas Associated with Natural Gas Pipelines," GRl-00/0169, Gas Research Institute, October 2000; and C.R. Sparks, "Romoto and Automatic Main Line Valve Technology Assessment," Gas Research Institute, July 1995.

31 Remotely Controlled Valvos on Interstate Natural Gas Pipelines (Feasibility Determination Mandated by the Accountable Pipeline Safety aud

Federal Register/Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules 7171

PHMSA is proposing to implement the section 4 mandate from the 2011 Pipeline Safety Act by requiring newly

constructed and entirely replaced natural gas transmission and hazai·dous liquid pipelines with nominal diameters of 6 inches and greater be equipped with remote-control valves, automatic shutoff valves, or equivalent technology, at distances specified under the valve spacing requirements per the current regulations.

For newly constructed pipelines of certain diameters and replaced pipelines of certain diameters and specific lengths, this NPRM would require rupture-mitigation valves located on both sides of a "shut-off segment," which is defined in this NPRM as the applicable segment of pipe between the valves closest to the endpoints of a high consequence area or Class 3 or 4 location. For hazardous liquid pipelines, any mainline valve located within a shnt-off segment would be a rupture-mitigation valve. For gas transmission pipelines, maximum valve spacing for shnt-off segments would apply based on class location factors.

Comments from pipeline operators and industry organizations point to a wide disparity in the percentage of sectionalizing valves that are RCVs or ASVs. This may reflect ilie use of very different decision criteria by different operators for determining when RCVs or ASVs should be installed. PHMSA determined a need for clarity in the criteria for rupture mitigation and segment isolation to ensure that valve configurations are capable of adequately mitigating the potential consequences of rupture releases, as discussed below,

ii. Standards for Rnpture Identification and Response Times

In this NPRM, PHMSA proposes requirements for rupture response and mitigation that would reqnire operators of certain pipeline segments to: {1) Determine the existence of a rupture within 10 minutes of initial identification; {2) make immediate and direct notification to the appropriate public safety answering point {9-1-1 emergency call centers); (3) initiate rupture-mitigation valve closure as soon as practicable after identifying a rupture; and 4) complete rupture­ mitigation valve shut-off (closure and rupture segment isolation) as soon as practicable but within a maximum time interval of 40 minutes after rupture

Partnership Act of Hl86); September 1989; l1ttps:I/ rosap.ntl.bts.gov/vicw/dot/16918/dot _ 1691 A_ DS1.pdf?.

identification,32 Operators may meet this standard using ASVs, RCVs, or equivalent technologies upon review by

PHMSA. This NPRM also proposes that operators conduct regular emergency drills and inspections to confirm the performance of operator systems, processes, procedures, and personnel to achieve this standard.

In the hazardous liquid ANPRM, the American Petroleum Institute (API), Association of Oil Pipelines (AOPL), the Texas Oil and Gas Association

(TxOGA), Louisiana Midcontinent Oil & Gas Association (LMOGA), and TransCanada Keystone Pipeline commented that there is no current industry standard setting a maximum spill volnme or valve activation timing due to the widespread variation in pipeline dynamics, and it therefore would be difficnlt to establish a one­ size-fits-all requirement for these items. APJ and AOPL suggested PHMSA shonld focus on prevention and

response rather than reducing spill size.

PHMSA agrees with the commenters that spill prevention and response am important to ensuring the safety of hazardons liqnid pipelines and that establishing a one-size-fits-all maximum spill volume would be extremely challenging dne to a variety of faclors, including different pipeline diameters, terrain surrounding pipelines, commodity type, operating conditions, sensitivity of the surronnding areas, and types and nature of flow paths. However, based on previous incident history, PHMSA has determined that it is necessary to define standards to ensure operators identify ruptures when they occur and promptly shut off mainline valves and isolate the ruptured

pipeline segment. As a resnlt, PHMSA is proposing to reqnire operators to base their decisions npon documented procedures that take into account unexplained flow rate changes, pressnre chnnges, instrumentation indications, and eqnipment functions, Factoring this information into the decision-making processes, when paired with additional pressure sensors located along the pipeline and valves that can be closed quickly after rupture detection, should help mitigate the effects of pipeline ruptures, For instance, such requirements would have helped mitigate the PG&E incident at San Bruno, CA, and the Enbridge incident near Marshall, MI, because the operators would have been in a better position to identify the ruptures if they were monitoring for the required information.

n As defined in this NPRM, rupture identification occurs when a rupture is observed by or reported to pipeline operating personnel or a controller.

The GAO report referenced in Section II of this NPRM noted that performance­ based goals established with reliable data and sound agency assessments could result in improved operator response with ASV and RCV use. The report also states that although existing

PHMSA regulations for operator response and ASV and RCV use are performance-based, they are "not well­ defined." Specifically, parts 192 and 195 cnrrently require operators to respond to incidents and accidents in a "prompt and effective manner" (§§ 192.615(a)(3) and 195.402(e)(2)). As mentioned earlier, however, identical response actions are not appropriate for all circmnstances due to the specific and highly variable location, equipment, and operating conditions involved on individual pipeline systems. The GAO noted some organizations in the pipeline industry believe that some form of performance-based goals can allow operators to identify actions that could improve their ability to respond to accidents, including ruptures, more consistently and in a timelier manner, and those organizations are taking steps to implement this approach, PHMSA agrees that a more precise regulation specific to ruptures would be effective in improving operator response times and mitigative actions hecause ruptures have recognizable operational signatures and, hence, more clearly defined triggers and actions that operators can take in response.

iii. Using RCVs or ASVs in All Cases

In the hazardous liqnid and gas transmission ANPRlv1s, PHMSA asked stakeholders to comment on whether the Pipeline Safety Regulations should include a requirement mandating the use of RCVs in all cases. The NTSB reinforced, via a submitted comment, that PHMSA should adopt requirements consistent with its recommendations P-11-10 and P-11-11. The NTSB noted in ils analysis of the San Bruno incident that if PG&E could have shut off the gas flow of its ruptnred segment sooner than 95 minutes, it would have likely resulted in a smaller fire of shorter duration as well as less risk to residents, their property, and first responders. The ORNL report and the GAO report referenced in this rulemaking reached conclusions similar to the NTSB's for both gas transmission and hazardous liquid pipelines. In other comments, Metro Area Water Utility Commission (MA WUC) indicated that PHMSA shonld consider requiring all valves to be remotely controlled but that its decision shonld be based on an analysis of benefits and risks, North Slope Borough (NSB) snpported the use of

7172 Federal Register/Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules

RCVs in all instances. A private citizen

commented that PHMSA should issue regulatory language requiring RCVs for poison inhalation hazard pipelines. Conversely, comments from industry groups and pipeline operators stated that the benefits of requiring all valves to be remotely controlled would be dependent on local factors, and such additional requirements would add to pipeline system complexity and increase the probability of failure.

In consideration of the comments received, PHMSA has determined that a requirement for all valves to be automatically or remotely controlled would not be feasible due to several technical concerns, including a lack of space for actuator and communication equipment in urban areas, no communications signal in certain areas, and the potential for vandalism. The ORNL report came to a similar conclusion in that it was technically feasible to install ASVs and RCVs provided there was sufficient space for the valve body, actuators, power sonrce, sensors, related electronic equipment, and tho appropriate personnel required to install and maintain the valves.

Further, PHMSA determined that it would be mast reasonable for newly constructed or entirely replaced natural gas transmission and hazardous liquid pipelines with diameters of 6 inches or greater to be subject to the valve

installation requirement per the Section 4 mandate in the 2011 Pipeline Safety Act. While it is technically possible for lines as small as 2 or 4 inches to have automatic shutoff or remote-control valves, the potential impact radii and release volumes would be smaller under those scenarios, and PHMSA would not expect there to be benefits commensurate with the costs of installing the valves. However, PHMSA would like comment on whether these assumptions are reasonable.

Therefore, PHMSA is addressing the mandate in the 2011 Pipeline Safety Act by proposing a valve installation requirement on newly constructed and entirely replaced gas transmission and hazardous liquid pipelines, as well as proposing a standard for rnpture identification and mitigation in areas of higher consequence. Alternatives considered by PHMSA are documented in the PRTA filed under Docket No. PHMSA-2013-0255 at http:// www.reg11lations.gov.

Several commenters on the gas transmission and hazardous liquid ANPRMs, including indnstry trade groups and pipeline operators, opposed a requirement that all sectionalizing valves be capable of being controlled remotely. As some cammenters pointed

out, RCVs or ASVs may not be warranted in many sitnations because of specific local conditions that could limit the safety henefits of such a requirement. The ORNL report also concluded that site-specific parameters can influence risk analyses and feasibility evaluations, and they can often vary significantly from one pipeline segment to another.

Recant high-profile pipeline construction projects shaw a wide use of ASVs and RCVs, which demonstrates

the feasibility and prevalence of these technologies. The interstate transportation of energy products, including natural gas, is subject to economic regulation by the Federal Energy Regulatory Commission (FERC). New gas transmission pipeline construction projects and significant changes to existing pipelines are therefore snbject to FERC review and environmental analysis reqnirements under the National Environmental Policy Ar.t. Final Environmental Impact Statements {EIS) published or approved after the 2011 Pipeline Safety Act have included some commitment to nse

ASVs or RCVs on new or upgraded gas transmission pipelines snbject to FERC

approval. The wide use of this technology demonstrates the feasibility and prevalence of the use of powered actuators or otherwise remote-controlled valves.

Far instance, the Southeast Market Pipelines Project 33 intended to equip all 63 mainline hlock valves with ASVs or RCVs within three connected natural gas transmission pipeline projects in Florida, Alabama, and Georgia. Similarly, per the Rover Pipeline final EIS,34 all 78 mainline block valves for the Raver Pipeline and related projects would be equipped for remote operation from the control center. The PRTA for this NPRM contains further information on this topic under Section 4.4-Valve Automation.

Further, recent high͊ profile hazardous liqnid pipeline construction projects

also show use of RCV s. The final EIS for TransCanada's proposed Keystone XL Pipeline project indicated that 71 ant of 112 intermediate mainline valves along the route would be remotely operated block valves, while an additional 24 valves would be designated as check valves (U.S. Department of State, 2011).

33 FERG, 2015. Southeast Market Pipelines Project, Final EIS, Office of Energy Projects. Volume 1, Section 2.G.1. l1Ups://www.ferc,gov/industl'ies/ gas/ ell viral efa/2015/12-18-15-eis. asp

34 FERG, 2016. Rover Pipeline, Panhandle Backhaul, and Trunkline Backhaul Projects, Final EIS, Volume 1, Section 2.2.2. htlps:/lwww.ferc.gov/ industries/ gos/enviro/ eis/2016/0 7 -29-16-rover­ pipeline .asp.

The North Dakota Public Service Commission reported that the Dakota Access Pipeline design includes remote actuators on all mainline valves in tho State of North Dakota (North Dakota Public Service Commission, 2016),

However, as stated before, PHMSA understands there may be technical challenges to requiring the use of automation in certain cases. Specifically, PHMSA is aware that there might not be the space necessary for operators to install equipment needed for an ASV or an RCV, and PHMSA also

realizes that in certain areas, operators might not be able to get the necessary communications signal to ASVs or RCVs so they work as intended. Therefore, a one͋ size-fits-all valve-type installation requirement may not he feasible. As such, PHMSA is proposing a rupture­ mitigation valve standard that provides operators flexibility lo install RCVs, ASVs, or an equivalent technology. Alternatively, operators may use manual valves where it is not economically, technically, and operationally feasible to use RCVs, ASVs, or an equivalent technology, This flexibility will allow operators to choose the most appropriate valve based on the nnique circumstances at each location, while still ensuring that such valves will close as soon as practicable but no later than 40 minutes after a rupture is identified. PHMSA welcomes any comments that stakeholders might have regarding the reasonahility of the proposed 40-minute valve closure time based on current technologies and capabilities. When considering an appropriate valve closure time for this rulemaking, PHMSA noted that many natural gas transmission and hazardous liqnid systems can have several junctions where product arrives and departs or where mnltiple pipelines are connected with each other in a series oflooped lines, On these mare complicated

pipeline systems, operators implementing shutoff procedures may need to consider factors inclnding the potential effects on pipeline systems flowing into a pipeline needing to be isolated, the restriction of downstream deliveries to vital customers, and the impacts of the complete isolation of looped comman-nse systems. Therefore, establishing a one-size-fits-all requirement for valve closure times on all natural gas transmission and

hazardous liquid pipeline systems can be challenging.

When developing the proposed valve­ closure time in this NPRM, PHMSA considered its work on the "Alternative MAOP" rulemaking and the requirements in that rule for operators to install RCV s and close valves within

Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7173

60 minutes on applicable pipeline segments. 35 PHMSA also considered its work on recent special permits and conditions in those permits for single, non-looped pipelines to have valves that can close within 30 minutes. Further, PHMSA notes that in the ANPRM stages of the Safety of Hazardons Liquid Pipelines and the Safety of Gas Transmission Pipelines rulemakings, PHMSA considered valve closure times of 30 minutes for both natnral gas transmission and hazardous liquid pipelines, and certain industry commenters representing gas pipeline operators proposed times of 60 minutes.

In this NPRM, PHMSA is proposing to require operators to close the necessary valves "as soon as practicahle"

following rupture identification with a 40ͅ minnte-maximum closure time hecanse 40 minutes represents a

reasonable outer limit to provide time, if needed, for operators to get personnel on-site to close any necessary valves. However, PHMSA expects RCVs or ASVs in most instances to be shut off in a much shorter timeframe.

PHMSA determined the 40-minute closure time as follows:

Locating the rupture: Once an operator confirms a rnpture is occurring, an operator needs to determine the location of the rupture. As a part of this process, control personnel would

identify the location of the mainline valves needing to be shut as well as any crossover valves and other pipeline systems that flow into or out of the impacted pipeline system. Control personnel would then identify the

systems needing to be isolated, if any, and the locations of the valves necessary to do so. If any of these systems are operated by a different operator, those

operators must be notified so that deliveries can be re-routed and so that deliveries are not restricted to critical customers such as hospitals or power plants. Following the rupture being

located, control personnel would dispatch operating personnel to the rupture site, mainline valve locations, and any other critical pipeline locations, Those operating personnel would commnnicate and collaborate with local

emergency responders to minimize the impact to the public and environment and identify safety needs, Fnrther, operators must notify other parties, including local distribution companies, operators of directly connected pipelines, power plants, and direct-feed manufacturing facilities to ensure that

35 "Pipeline Safety: Standards for Increasing the Maximum Allowable Operating Presslll'e for Gas Transmission Pipelines: Final Rule;" October 17,

2008; 73 FR 62148.

rapid valve closures do not cause emergency cascading events due to increased pressures, surges, or the lack of energy prodncl. PHMSA has estimated these actions will be completed anywhere between 5 and 15 minutes of rupture identification.

Isolating the n1ptured segment: An operator will begin closing the appropriate valves once a ruptnre is identified and located. This might include mainline valves, any crossover valves, and valves to other pipeline systems that flow into or ant of the ruptured pipeline system. Operating personnel would continue to work with emergency responders to minimize the impact to the public and identify safety needs. If a valve fails to close, the local pipeline operating personnel would close it. PHMSA notes that RCV shutdown times will vary based on size, whether it is a ball or gate valve, the actuator type, and the operating pressure at the time of closure, which will depend on how close it is located to the ruptnre site, ASV shutdown times will vary based on the preceding factors as well as the minimum pressure or the rate of pressure change at the mainline valve. All pipeline system valve shutdown times require the consideration of the valve closure timing and its impact on maximum operating pressures and surge pressures from the speed of valve closure on the pipeline system and any laterals or

other pipeline systems connected to the ruptured pipeline. Under emergency conditions and given operating pressures, PHMSA estimates an RCV can be closed within 5 to 15 minntes after rupture identification and location, an ASV can he closed within 10 to 25 minutes after rupture identification, and a valve needing some type of manual actuation conld be closed within 15 to 25 minutes after rupture identification. Based on this analysis, PHMSA is proposing a maximum 40-minute valve closure period; however, PHMSA welcomes comments regarding whether this timeframe conld he reasonably lowered so that segments are isolated more quickly and ruptures are mitigated faster, or whether there are other reasons that would preclude an operator from confirming a rupture and closing an ASV, RCV, or equivalent valve within 40 minntes after the identification of a rupture. Similarly, PHMSA welcomes comment on the 40- minute closure limit as it applies to any manual valves that operators might need to install because installing ASVs, RCVs, or equivalent technology is not feasible.

PHMSA also notes that the "Alternative MAOP" final rule

pnblished on October 17, 2008, which affects gas transmission pipelines, finalized a requirement to provide remote valve control through a SCADA system, other leak detection system, or an alternative method of control. This requirement applies if personnel response time to mainline valves on either side of an HCA exceeds 1 hour (under normal driving conditions and posted speed limits) from the time an emergency event is identified iu the operator's control room. PHMSA welcomes comment on whether it should revise the Alternative MAOP rule's requirements to match this

rulemaking's proposed 40-minute response time, or whether this rulemaking should be made consistent with the Alternative MAOP rule and establish a GD-minute response time following rupture identification.

C. D1·ills To Validate Valve Closure Capability

In response to the hazardous liquid ANPRM, Texas Pipeline Association (TPA) and others commented that requiring additional valve automation could result in an increased probability of valve or system failure. PHMSA agrees that the addition of any type of engineered equipment is accompanied

by a potential for mechanical or operational failure. This rule proposes inspection and maintenance provisions to minimize this possibility, These inspection and maintenance provisions would apply to procedures and equipment that should be in use to isolate pipeline segments in the event of potential incidents. More specifically, PHMSA proposes to require that operators conduct initial and periodic validation drills to ensure that valves designated for rupture mitigation will

close to ensure that the response and shut-off times of this proposal can be reliably and consistently achieved, PHMSA is also proposing demonstration and verification

requirements, including point͆ to-point verification tests for RCVs, to ensure that communications equipment works. New provisions proposed in this NPRM would also require that any deficiencies be identified and corrected within a fixed period, and that any lessons learned during these drills he applied system-wide to ensure adequate performance in futnre emergencies. PHMSA has proposed these reqnirements because any newly installed valve systems will require regular maintenance activities and emergency drills to ensure they operate as intended per the proposals in this rulemaking.

7174 Federal Register/Vol. 85, No. ZS/Thursday, February 6, 2020/Proposed Rules

The ORNL report discussed in Section II of this NPRM documented the reliable operation of ASVs and the importance of operating procedures in ensuring the reliability of RCVs. The report noted that, in areas that are susceptible to

electrical power outages, reliability is a potential concern, and redundant, alternative, or backup power sources may be required to ensure continuous availability of electricity for motors, solenoids, and electronic components. Proper valve maintenance involving seat and valve-body cleaning, packing and gasket replacement, and valve closure testing to ensure that ASVs actuate on command and close completely, are issues that influence operational feasibility. As PHMSA notes thronghout this NPRM, rupture-mitigation valves must function properly when needed following an identified ruptnre to quickly mitigate the consequences of pipeline ruptures, including property and environmental damage. The drill requirements are proposed in§ 192.745 for onshore gas transmission pipelines and§ 195.420 for onshore hazardous liquid pipelines.

D. Maximum Valve Spacing Distance

i. Gas Transmission Pipelines

Existing regulations for gas transmission pipelines at § 192.179 already contain provisions for

maximum valve spacing based on class location. This NPRM proposes supplementary requirements for rupture-mitigation valve spacing in newly defined "shnt-off segments" on newly constructed or replaced onshore gas transmission pipelines.

These "shnt-off segments" are segments of pipe between the upstream mainline valves closest to the upstream endpoints of the HCAs or Class 3 or 4 locations and the downstream mainline valves closest to the downstream endpoints of the HCAs or Class 3 or 4 locations so that the entirety of the applicable HCA or Class 3 or 4 location is contained between a set of rupture­ mitigation valves. A shut-off segment can contain multiple HCAs or Class 3 or 4 locations-an operator of such a segment would need to ensure that the entirety of the contiguous class locations and HCAs are within a set of rupture-mitigation valves. Shut-off segments also extend to the nearest mainline valves of any crossover and lateral pipe that connects to the shut-off

segment between the furthest upstream and downstream mainline valves. All valves on shut-off segments would be identified as "rupture-mitigation valves" for the purposes of this rulemaking and its proposed provisions

so that, when closed, there is no flow path for gas lo be transported to the rupture site (except for any residual gas already in the ruptured shut-off segment).

In this NPRM, PHMSA proposes that the distance between rupture-mitigation valves for each shut-off segment must not exceed 8 miles for shut-off segments containing a Class 4 location (with or without an HCA), 15 miles for a shut­ off segment containing a Class 3 location (with or without an HCA), and 20 miles for a shut-off segment containing HCAs in Class 1 or 2 locations. These proposed rupture­ mitigation valve spacing requirements for shut-off segments are in accordance with§§ 192.179 and 192.611 for pipeline class location segments that have had a one-class class location change (a Class 1 to a Class 2, a Class 2 to a Class 3, or a Class 3 to a Class 4 change) and meet the criteria under § 192.611{a) for a "one class change

bump." This allows operators to use the

valve spacing required in § 192.179 for the previons class location when creating shut-off segments where the class location has recently changed, Shut-off segments containing different class locations or HCAs must have valve spacing eqnivalent to the spacing, as provided above, for the most stringent class location in the shnt-off segment.

In response to questions in the gas transmission ANPRM related to valve spacing, INGAA contended that while valve spacing and selection are important factors in incident response, public safety reqnires integrated planning and implementation for

detecting ruptures and closing valves, which ING AA ca1led an "Incident Mitigation Management'' (IMM) plan in its comments. INGAA described IMM as a holistic performance-based means of detecting and responding to pipeline failures with some similarities to the proposals in this NPRM, INGAA contends that IMM plans should cover varions aspects of response, including how operators detect failures, how they place and operate valves, how they evacuate gas from pipeline segments, and how they prioritize coordination efforts with emergency responders.

Conversely, Accufacts contended that existing spacing requirements are inadequate and suggested that further regulation is required concerning the placement, selection, and choice of RCVs, ASVs, or equivalent technology, They stated that valve spacing and closure play a significant role in depressurizing a gas pipeline segment after a rupture, thereby limiting the total volume of gas released in an incident. The Pipeline Safety Trust also

supported the installation of additional valves on gas transmission pipelines to

reduce consequences following large­ scale incidents. A private citizen suggested that valves be required at 1- mile intervals in densely populated urban areas and that they close automatically in the event of an incident.

PHMSA agrees with certain commenters that the mere installalion of additional valves, including RCVs or AS Vs, will not reduce the frequency of gas transmission pipeline releases. The mere presence of a valve will not prevent an incident from occurring. However, PHMSA disagrees with the

same commenters who assert that additional valves do not reduce the consequences after such releases, as prompt rnptnre identification, response, and segment isolation through valve shut-off are key factors in limiting and reducing incident consequences. As discussed throughout this NPRM,

PHMSA has determined that prompt operator rupture identification and mitigation, which includes the isolation of the rupture or failed segment as soon as practicable, aro important factors that can contribute to reduced consequences.

ii. Valve Spacing in Response to Class Location Changes

In addition to the valve spacing requirements listed above related to shut-off segments, PHMSA is also proposing that operators be required to add valves if necessary to meet the applicable valve spacing requirements when changes to class location occur that require pipe replacement. PHMSA notes that a gas pipeline's class location broadly indicates the level of potential consequences for a pipeline release. Section 192.179 currently requires closer valve spacing for higher class locations. Areas of potentially higher consequences (i,e., HCAs) can be in lower class locations as well. HCAs in Class 1 or Class 2 locations include pipeline segments where a release could have severe consequences similar to a release in Class 3 and Class 4 areas. In HCAs, operators are required to provide additional protection in accordance with the integrity management requirements of part 192, subpart 0.

There were several comments related to now valve installations in the event of a class location change so that those valves meet the spacing reqnirements of § 192,179, The Gas Piping Technology

Committee (GPTC), AGA, INGAA, and several of INGAA's memhers

(MidAmerican, Paiute, and Southwest Gas) opposed applying§ 192.179 requirements retroactively to class location changes. Commenters also

Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules 7175

expressed opinions that the existing regulations are adequate. However, the Commissioners of Wyoming County, Pennsylvania and CPUC commented that regulations should require additional valves when population increases and class locations change. Additionally, Accufacts suggested that new mainline valves should be installed when a site becomes an HCA regardless of class location, but a reasonable time shonld be allowed for snch valves to be installed and become operational.

Valve spacing requirements in § 192.179 are based upon the class

location. VVhen a pipeline class location changes because of additional development near a pipeline, this increases both the potential consequences of a release and the potential benefits of closer valve spacing for consequence mitigation. PHMSA proposes to only require that valve spacing be made to match the requirements in§ 192.179 for a new class location when pipe replacement is necessary in response to a class location change, such as a Class 1 to Class 3, or a Class 2 to Class 4. Note that this requirement wonld be consistent with tho 1998 Final Order for Viking

Pipeline,36 which required class location changes to meet the mainline valve spacing as defined in§ 192.179 and the installation of a sectionalizing valve based upon the class location in a "replaced pipeline segment." Under this approach, when a class location change is implemented using only a pressure test in accordance with § 192.611 bnt without pipe replacement,

then additional valve installation wonld not be required. 37 This approach will better balance the potential benefits from mitigating consequences of releases because of closer valve spacing with the costs of installing new valves, costs that will be lower if operators install additional valves in the context of installing new pipe for a class location change.

iii. Hazardons Liquid Pipelines

For onshore hazardous liquid pipelines, existing regulations establish valve location requirements for certain pipeline facilities and locations, such as at pnmp stations, breakout storage

3r. In the Matter of Viking Gas Transmission, Final Order, C.P.F. No. 32102 (May 1, 1998).

37Valve spacing requirements aro in the design and construction sections of the regulations, If a pipeline segment changes class locatioll but can be succ0ssfully pressure tostod to the MAOP standards of the next highest class location per§ 192,611, PHMSA cannot retroactively impose now valve spacing on an existing segment. However, if the segment is replaced by virtue of a higher class location, the more stringent valve spacing rcquirem@ts would apply.

tanks, lateral takeoffs, certain water crossings, public water reservoirs, and for other locations as appropriate, based on terrain, localion of populated areas, and other factors. However, a maximum distance for valve spacing for new pipelines is not currently specified. In response to the hazardous liquid ANPRM, several indnstry granps and individnal operators noted that ASME B31.4, a consensus industry standard published by the American Society of Mechanical Engineers (ASME), includes a maximum valve spacing requirement of 7½ miles for liquefied petroleum gas and anhydrous ammonia pipelines in

populated areas. Specifically, these commonters staled that valve spacing varies, that most mainline valves are manually operated, that check valves are used in certain cases, and that some remotely controlled valves had been added becanse of the integrity management requirements.

PHMSA also asked for public comment on how the agency should apply any new valve location requirements developed for hazardous liquid pipelines. API and AOPL, supported by TransCanada Keystone Pipeline, LMOGA, and TxOGA, indicated that valve spacing requirements should not be changed, and that specifying valve location reqnirements retroactively would be difficult and confusing, Further, these commenters indicated that requiring tho retrofitting of existing lines to meet any

type of new requirement would be expensive for indusll·y, create environmental impacts, lead to potential construction accidents, and may cause possible interruptions of service. MAWUC and NSB commented that any new valve locations or remote actuation regnlations should be applied to new pipelines or existing pipelines that are repaired.

In this NPRM, PHMSA is proposing that newly constructed and entirely replaced hazardous liquid pipelines with nominal diameters of 6 inches or greater have antomatic shutoff valves, remote-control valves, or equivalent technology spaced in accordance with the existing hazardous liquid valve location provisions and the valve spacing requirements proposed in this rulemaking, as there are no current valve spacing reqnirements in the regulations for hazardous liquid pipelines.

For newly constructed onshore hazardous liquid pipelines that could affect HCAs or for hazardous liquid pipelines in areas that could affect HCAs and where 2 or more contiguous miles have been replaced, PHMSA is proposing a maximum valve spacing of

every 15 miles. PHMSA based this spacing mileage, in part, off of Class 2 requirements for natural gas pipelines, Additionally, PI-IMSA believes that, given the current guidelines operators must consider regarding local terrain and drain-down volnmes, a maximum spacing of 15 miles for valves in HCAs would be reasonable.

For newly constructed onshore highly volatile liquid (HVL) pipelines in high popnlation areas or other populated areas, as those terms are defined in § 195.450, or for HVL pipelines in those

areas where 2 or more contiguous miles have heon replaced, PHMSA is proposing a maximum valve spacing of every 7½ miles, PI-IMSA notes that the current ASME B31.4 code provides for a 7½ mile maximum valve spacing requirement on piping systems transporting liquefied petroleum gas or liquid anhydrous ammonia in industrial, commercial, and residential

areas.

In an attempt to be more consistent with similar aspects of the natural gas pipeline regulations and taking into account the valve spacing requirements for Class 1 locations, PHMSA is proposing a 20-mile maximum valve spacing requirement for newly constrncted and replaced hazardous liquid pipelines that conld not affect HCAs.

Part 195 currently does not prescribe whether manual or remote control valves must be installed at particular locations, but it does require the consideration of check valves and remote control valves under the EFRD requirements for pipelines that conld affect an HCA. Section 4 of the Act includes a new mandate for PHMSA to evaluate and issue additional regulations for the use of valves (such as remote control, automatic shut-off, or equivalent technology) for rupture mitigation, The current proposal seeks to establish a reasonable maximum distance that would apply to any type of terrain and in any area, regardless of population or environmental sensitivity. PHMSA expects that operators, in their pursuit of compliance with other valve location requirements, will locate,

install, and equip valves for remote or automatic operation as needed and in accordance with the requirements of the integrity management regulations (§ 195.452(i)(4), including Appendix CJ. This will result in valve location profiles that meet their operational needs and are reflective of the risks and potential consequences unique to their individual pipelines, inclnding the

consideration of factors such as maximum spill volumes, terrain, and population and environmental

7176 Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules

receptors. The maximum spacing requirements would not supplant or supersede any other valve location requirement and would only apply to newly constructed and replaced pipelines of certain diameters. These proposed requirements address Section 4 of the 2011 Act and are consistent with PHMSA's efforts to address NTSB Recommendation P-11-11 for gas transmission pipelines as well.

For newly constructed and replaced segments that could affect an HCA or that are within an HCA, valves would be required at a minimum of every 15

miles. For new and replaced segments transporting highly volatile liquids (HVL) in HCAs established due to populated areas, the maximum distance

between valves wonld be 7½ miles. This requirement mirrors the requirements that cunently exist nnder ASME B31.4 for HVL mainline valve spacing and is necessary dne to the unique safety risks these pipelines pose to populated areas, In addition, valves located on each side of a water crossing greater than or equal to 100 feet (30 meters) wide would be required to be installed outside the flood plain. The requirements of this proposed rule, specifically applying to segments of new or replaced pipelines that conld potentially impact HCAs, would result in the placement of valves on each side of these HCA segments, This requirement acknowledges the sensitive nature of these specifically defined areas and requires their protection with mainline valves comparable to other sensitive locations,

The new requirements for valve spacing are proposed in§§ 192.179, 192.610 and 192.634 for gas transmission pipelines and§§ 195.260

and 195.418 for hazardous liqnid pipelines.

E. Integrity Management and the Pmtection of HCAs

This NPRM would also strengthen integrity management requirements for both onshore gas transmission and hazardous liquid pipelines by addressing the use of ASVs or RCVs

(including EFRDs) in HCAs as they apply to rupture mitigation. These existing requirements are at§ 192.935(c)

for gas transmission pipelines and § 195.452(i)(4) for hazardous liquid

pipelines, and they specify that operators must conduct a risk analysis and add additional ASVs, RCVs, and EFRDs, as needed, to provide additional protections for HCAs, As gas transmission pipeline segments in HCAs are, by definition, near higher­ population areas and developments and include areas where people assemble or

have difficult-to-evacuate facilities such as schools or hospitals, releases from these segments have a higher potential for adverse consequences than releases from other segments.

i. Gas Transmission Pipelines

In the gas transmission ANPRM, commenters addressed PHMSA's consideration of additional decision criteria for operator evalnation of additional valves, remote closure, and valve automation, INGAA, AGA, GPTC, Ameren, and MidAmerican were not in support of additional decision criteria, whereas Accufacts, CPUC, and an anonymous commenter were in support of additional decision criteria. Accufacts argued that valve regulations should be required for larger-diameter gas transmission pipelines in HCAs, especially in areas where manual closure times conld be long, CPUC expressed its conclusion that decision criteria may need to be added for all Method 1 HCA locations. as

PHMSA notes that although§ 192.935 currently requires operators to consider installing additional RCVs and ASVs to mitigate potential consequences to HCAs, the regnlation does not establish criteria based on consequence reduction to guide operator decisions. In developing this rulemaking, PHMSA has noted the challenges of requiring

certain types of valves at specific locations, Therefore, PI-IMSA has determined that the most beneficial criteria for rupture mitigation are standards for rupture identification and response times paired with maximum valve spacing requirements, becanse limiting the consequences of a release is primarily dependent upon how quickly an operator identifies, acknowledges, and isolates a rupture. In this NPRM, the required time thresholds for operator response following rnpture identification serve as the decision criteria. Because the rupture response and mitigation requirements of this rulemaking will apply to newly constructed systems and entirely replaced pipeline systems of 2 contiguous miles or greater, operators can design their valve configurations as

needed to address site-specific issnes while meeting the proposed ruptnre-

38Method 1 is defined in§ 192.903 HCA definition, paragraph (1) as a Class 3 or Cfass 4 locaUon as those terms arc defined under§ 192.5; or any area within a Class 1 or Class 2 location whoro the potontial impact radius is greater than 660 feet, and the area within a potential impact circlo contains 20 or more buildings intended for human occupancy; or any area in a Class 1 or Class

2 location where the potential impact circle contains an identified site. Definitions for "potential impact radius," "potential impact circle," and "idenUfied site" are atŜ 192.903.

mitigation requirements. Operators can determine what kinds of response and communication procedures need to be established, if arrangements need to be made for valve access by local operating personnel, if valves need to be equipped for remote or antomatic operation and whether some other alternative equivalent technology can be employed to meet the standard.

ii. HazaTdous Liquid Pipelines

The hazardous liqnid integrity management regnlations issued in 2002 require operators to assess and o.djust their existing EPRD configurations to better protect HCAs. GAO's findings in GAO-13-168 support PHMSA's experience that large discrepancies still exist in how individual operators nse existing valves as EFRDs, due largely to the lack of prescription in hath the regulations and industry standards relating to EPRD installation. The lack of rapid closure capability has been found to have significantly exacerbated both the volume released and the adverse consequences in past accidents, even when emergency situations were qnickly recognized by the operator. The ORNL report (ORNL/TM-2012/411) confirmed that "swiftness of valve closnre has a significant effect on mitigating potential socioeconomic and environmental damage to the hnman and natural environments." Similarly, the GAO study also found that "quickly isolating the pipeline segment through automated valves can significantly rednce snbseqnent damage by reducing the amount of hazardons liquid released.''

PHMSA detem1ined that there is a need to establish additional requirements related to EFRD actuation for newly constructed and replaced pipelines of 2 contiguous miles or greater in I-ICAs, as pairing standards for valve actuation with considerations for valve placement will help to achieve fuller safety benefits when considering rupture mitigation. This NPRM would also include annnal inspection and maintenance reqnirements to assure that any valves installed under this rulemaking would reliably operate on­ demand during emergency situations.

In response to the hazardous liquid ANPRM of October 18, 2010, PHMSA received comments on location and performance standards for EFRDs from industry and trade associations. API, AOPL, TxOGA, LMOGA, and TransCanada Keystone Pipeline

reported that no industry standards currently address EFRD use. PHMSA also received several comments regarding location requirements for EFRDs, indicating that PHMSA should

Federal Register/Vol. 85, No, ZS/Thursday, February 6, 2020/Proposed Rules 7177

not specify the location of EFRDs. More specifically, API, AOPL, TransCanada Keystone Pipeline, LMOGA, and TxOGA indicated that a requirement to place EFRDs at predetermined locations or fixed intervals in lieu of a comprehensive engineering risk analysis would be arbitrary, costly, and

potentially counter-productive to pipeline safety. They noted that § 195.452 already requires EFRDs to be

installed to protect an HCA if the operator determines, through a risk assessment, that an EFRD is needed, and TPA suggested that no general criteria beyond those in the existing regulations are appropriate because decisions on EFRD placement are driven by local factors. Conversely, NSB and MAWUC stated EFRDs should be required on all pipelines PHMSA regulates, with

specific instruction or criteria on when and where EFRDs need to be used, especially if they can limit a spill.

As discussed above, PHMSA determined that lhe lack of more comprehensive and specific guidance regarding the location and performance requirements for EFRDs perpetuates the inconsistencies and large variances in operators' response times in isolating pipeline segments when failnres occur, particularly when a rupture or other fast-acting, large-volume release occurs. Valves, even when located properly, are more effective in failure scenarios when they can be closed quickly to isolate the failed segment. PHMSA also notes that AS:tv!E B31.4, "Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids'' {2009), addresses mainline valves and specifies operators install RCVs and/or check valves in certain instances.

Furlhermore, PHMSA determined that, although the EFRD evaluation requirement already exists for HCA segments, additional measures are needed to specifically address rupture mitigation for new and replaced pipelines. In accident reports submitted to PHMSA by operators from 2010 to 2017, just over one-half of all HCA incidents where valve type was recorded occurred at a location where either the upstream or downstream valve was an antomatic, remotely controlled, or check valve. In approximately one-lhird of incidents occurring in an HCA, both the upstream and down valves were actuated by some manner of antomation, It is difficnlt to envision a case where some type of rupture-mitigation valve (which in some cases can be an EFRD) on either side of (or within) an HCA segment would not provide additional protection. In all cases where a valve cannot be quickly accessed and manually closed, remote

or automatic actuation is the only way to ensure prompt and effective closure.

In the hazardous liquid pipeline regulations, EFRDs are defined as check valves or remote-control valves. Althongh check valves can be considered as either an ASV or an EFRD in some applications, this NPRM only considers them to be a rupture­ mitigation valve if an operator can demonstrate the valve's operational and protective equivalence when the valve is used for segment shut-off and isolation in response to a rupture. The NPRM proposes that operators must annually verify check valves OT EFRDs are operational if they serve as rupture­ mitigation valves. Considerations for the use of check valves as alternative equivalent technology for ruptnre mitigation should include all of the factors identified in this proposal and all existing regulations, including those contained in part 195, appendix C, such as the nature and characteristics of the transported commodity, the physical and operating characteristics of the pipeline, the hydraulic gradient of the pipeline, tho terrain surrounding the

pipeline, and all other factors pertinent to ruptnre mitigation including valve closure sealing performance and closure times.

F. Failure Investigations

Current pipeline safety regulations (§ 192.617 for gas transmission pipelines and§ 195.402(c)(5) for hazardous liqnid pipelines) require operators to report all incidents (gas) and accidents (hazardous liquid) over certain reporting thresholds, and to investigate incidents and accidents involving failed pipe, failed components or other pipeline system equipment, and incorrect operations. The terms incident and accident are used interchangeably in this NPRM.

In addition to the proposed rupture response and mitigation requirements, PHMSA is proposing new specific requirements for post-accident analysis (i.e., an accident investigation) of any rupture or other event involving the activation of rupture-mitigation valves. These post-accident reviews would focus on ways to ensure that the proposed performance objectives in this

NPRM are met in the future and that lessons learned can be applied by the operator system-wide. PHMSA has determined this will improve the safety performance of individual operators, while also improving the industry's overall safety performance throngh information sharing forums.

The NTSB noted in its accident report of the PG&E incident at San Bruno, CA, that many of the organizational

deficiencies causing the incidenl were previously known to the operntor as a result of previous accidents. The NTSB further noted that, as a lesson from those accidents, PG&E should have critically examined all components of its pipeline system to identify and analyze risks as well as update emergency response procednres. Had this recommended approach been taken by PG&E following earlier incidents, lhe NTSB argued, the San Bruno accident may have been prevented. Similar organizational failures were found following the Enbridge incident near Marshall, MI, and the NTSB noted that Enbridge failed to adapt lessons learned into its IM program.

Consistent with the findings in the GAO Report (GAO-13-168) and recommendations as described in this section, the proposed amendments in this NPRM wonld inclnde new post­ accident review and implementation reqnirements in§§ 192.617 and 195.402(c)(5). As provided in the regulatory text, PHMSA would expect operators would analyze data points including, bnt not limited to, the time

taken to detect a rupture, the time la.ken to initiate mitigative actions, emergency response communications, personnel response time, valve closure time, SCADA performance, and valve location, Operators would then use these data points to enact improvements to the operator's suite of procedures, including its training and qualification programs, pipeline system design, risk management, operations and maintenance activities, and emergency response procednres.

IV. Section-by-Section Analysis of Changes to 49 CFR Part 192 for Gas Transmission Pipelines

Sec. 192.3 Definitions Most of the requirements of this NPRM would be triggered by the identification of a "rupture.'' Section 192.3 would be amended to define "ruptnre" as any of the following events that involve an uncontrolled release of a large volume of gas over a short period of time: (1) An unanticipated or unplanned pressure loss of 10 percent or more, occurring within a time interval of 15 minutes or less, unless the operator has documented in advance of the pressure loss a need for a higher pressure change; (2) an unexplained flow-rate change, pressure change, instrumentation indication, or equipment function that may be representative of an event described above; or (3) an apparent large-volnme, uncontrolled release of gas or a failure observed by operator personnel, the

7178 Federal Register/Vol. 85, No, 25/Thursday, February 6, 2020/Proposed Rules

public, or public authorities, that is reported to the operator and that may be representative of an unintentional and uncontrolled release event that is defined in the items above.

Sec, 192.179 Transmission Line Valves PHMSA proposes adding paragraph (e) lo require that all valves on newly constructed or entirely replaced onshore gas transmission pipelines that have nominal diameters greater than or equal to 6 inches be automatic shut-off valves, remote-control valves, or an equivalent technology, unless such valves are not economically, technologically, or operationally feasible. PHMSA proposes to permit the installation of manual valves as rupture-mitigation valves only when there are feasibility issues precluding the installation of antomatic or remote-control valves. All valves installed per this requirement would have to meet the new rupture-mitigation standards proposed in§ 192.634 and isolate a ruptured pipeline segment within 40 minntes of rupture identification. Rupture identification would be defined in§ 192,3 to occur when a rupture is reported to or observed by pipeline operating personnel or a controller.

Sec. 192,610 Change in Class Location: Change in Valve Spacing

A new§ 192.610 is proposed to specify rupture-mitigation valve requirements when a class location changes. In cases where pipe is replaced to meet the maximum allowable operating pressure in accordance with requirements for class location changes under§§ 192,611, 192.619(a), and 192.620, then the rupture-mitigation valve installation requirement in § 192.179 applies for the new class

location, which may require the operator to install new valves, and the rupture-mitigation requirements of § 192.634 would apply as well. Such

additional valvos mnst be installed within 24 months of the class location change.

Sec. 192.615 Emergency Plans PHMSA proposes to revise paragraphs (a)(Z), (a)(6), (a)(B), (a)(ll), and (c) of § 192.615 to require that emergency

procedures provide for rupture mitigation in response to a rupture event, including specific timing provisions relating to the identification of ruptures. Specifically, operators must have procodnres in place allowing them to identify a rupture event within 10 minutes of the initial notification to the operator. PHMSA also proposes to require that operators maintain liaison with and contact the appropriate public

safety answering point {9-1-1 emergency call center) in the evont an operator's pipeline ruptures.

Sec. 192.617 Investigation of Failures and Incidents

PHMSA proposes to revise§ 192.617 to define the elements that an operator must incorporate when conducting a post-incident analysis of certain specifically defined incidents, namely ruptures, and other release and failure events involving the activation of rupture-mitigation valves.

The proposed revision would require the operator to identify potential preventive and mitigative measures that conld be taken to reduce or limit the release volume and damage from similar events in the future. The post-incident review would addross factors associated with this rulemaking, including but not limited to detection and mitigation actions, response time, valve location, valve actnation, and SCADA performance. Upon completing the post­ accident analysis, the operator must develop and implement the lessons learned throughout its suite of procedures, including in pertinent operator personnel training and qualification programs, and in design, construction, testing, maintenance, operations, and emergency procedure manuals and specifications.

Sec. 192.634 Transmission Lines: Onshore Valve Shut-Off for Rupture Mitigation

Proposed new§ 192.634 would establish an emergency operations standard requiring operators to isolate certain ruptured pipeline segments as soon as practicable via rupture­ mitigation valves with complete segment isolation as soon as practicable but within 40 minutes of identifying a rupture. This would apply to newly constructed and entirely replaced onshore gas transmission pipeline segments in HCAs and Class 3 and Class 4 locations with nominal diameters greater than or equal to 6 inches, and it would also apply to any gas transmission pipelines where 2 or more contiguous milos of pipeline with nominal diameters greater than or equal to 6 inches are replaced in HCAs and Class 3 and Class 4 locations. This NPRM would require that operators designate sbut-off segments in these areas and designate mainline valves used to isolate ruptures on those shutoff segments as rupture-mitigation valves. This rulemaking would establish maximum distances between rupture­ mitigation valves from 8 to 20 miles depending on tho pipeline's class location, Compliance with the standard

could be achieved using ASVs, RCVs, or an equivalcut technology. Operators may iustall manually or locally operated valves to act as rupture-mitigation valves only if the installation of ASVs, RCVs, or equivalent technology is not feasible at the location, provided the operator demoustrates that the 40- minule closure standard can be achieved under emergency conditions.

Operators using mannal valves or other equivalent technology must notify PHMSA in accordance with the procedure outlined in§ 192.634(h). The NPRM would also require that operators monitor the position and operational status of all rupture-mitigatiou valves. Operators will be required to meet these provisions within 12 monlhs after the effective date of the final rule.

Sec. 192.745 Valve Maintenance: Transmission Lines

PHMSA proposes to revise§ 192.745 by adding paragraphs (cl, (d), and (o) to incorporate the maintenance, inspection, and operator drills required to ensure operators can close a rupture­ mitigation valve as soou as practicable, but withiu 40 minutes of rupture identification. Demonstration and verificatiou requirements are proposed, including point-to-point verification tests for rupture-mitigation valves that are ASVs or RCVs and initial validation drills and periodic confirmation drills for any manually or locally operated valve identified as a rupture-mitigation valve. The operator would be required to identify corrective actions and lessons learued resulting from its validation and confirmation drills and share and implement them across its entire network of pipeliue systems.

Sec, 192.935 Wlwt additional preventive and mitigative measw·e must

an operator take?

PHMSA proposes to revise § 1. 92,935(c) to clarify the requirements

for conducting ASV aud RCV evaluatious for HCAs, pa1ticularly wheu RCV s and ASV s are installed as preventive and mitigative measures associated with improved response times for pipeline ruptures. The amendments would require that operators be able to evaluate and demonstrate that they could identify a rupture within 10 minutes in accordance with the proposed § 192.615(a)(6) and meet the standard

specified in the proposed§ 192.634 to isolate shut-off segments in HCAs during rupture events as soon as practicable but within 40 minutes. Operators would also be required to demonstrate, through the risk analysis required by this section, that any ASVs

Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7179

or RCVs installed under this section can comply with the proposed valve

maintenance requirements at§ 192.745.

V. Section-by-Section Analysis for

Changes to 49 CFR Part 195 for Hazardous Liquid Pipelines

Sec. 195.2 Definitions Most of the requirements of the NPIUvf would be triggered by the identification of a "rupture." Section 195.2 would be amended to define "rupture" for hazardous liquid pipelines as any of the following events that involve an uncontrolled release of a large volume of hazardous liquid over a short period of time: (1) An unanticipated or unplanned flow rate change of 10 percent or greater or a pressure loss of 10 percent or greater, occurring within a time interval of 15 minutes or less, unless the operator has documented in advance of the flow rate change or pressure loss the need for a higher flow rate change or higher pressure-change threshold due to pipeline flow dynamics and terrain elevation changes that cause fluctuations in hazaTdous liquid flow that are typically higher than a flow rate change or pressure loss of 10 percent or greater in a time interval of 15 minutes or less; (2) An unexpected flow rate change, pressure change, instrumentation indication, or equipment function that may be representative of an event defined above; or (3) An apparent large-volume, uncontrolled release of hazardous liquid or a failure observed by operator personnel, the pnblic, or public authorities, that is reported to tbe operator and that may be representative of an unintentional and uncontrolled

release event that is defined above,

Sec. 195.258 Valves: General PHMSA proposes to require that all valves on newly constructed and entirely replaced hazardous liqnid lines that have nominal diameters greater than or equal to 6 inches Le RCVs, ASVs, or an equivalent technology, unless such valves are not economically, technologically, or operationally feasible. PHMSA proposes to permit operators install manually or locally operated valves only when there are feasibility issues precluding the installation of ASVs, RCVs, or equivalent technology. All valves installed under this requirement would have to meet the new rupture-mitigation standards proposed in§ 195.418 and isolate a ruptured pipeline segment as soon as practicable, bnt within 40 minutes of rupture identification. Rupture identification wonld be defined in § 195.2 to occur when a rupture is

reported to or observed by pipeline operating personnel or a controller.

Sec, 195,260 Valves: Location Section 195,260 proposes the requirements for the location of valves on newly constructed hazardous liquid pipelines, entirely replaced hazardous liquid pipelines, and hazardous liquid pipelines where 2 or more contiguous miles have been replaced. PHMSA proposes to revise§ 195.260 to incorporate new maximum valve spacing requirements for the general placement of valves, including a 20-mile maximum spacing requirement for valves on pipelines that could not affect high consequence areas, with more stringent maximum spacing requirements of15 miles and 7.5 miles for pipelines that could affect HCAs and HVL pipelines in populated areas, respectively. These valve spacing requirements carry over to the rupture­ mitigation valve spacing requirements at § 195.418 as well, whore operators would be required to install ruptnre­ mitigation valves at a maximum of every 15 miles but no further than T½ miles from the HCA segment endpoints and at a maximum of every 7½ miles for HVL lines in highly populated areas. Revisions to§ 195.260 would also include two miscellaneous clarifications: (1) To explicitly include carbon dioxide as a transported commodity whose consequences are to be considered, and (2) to include new requirements pertaining to valves at water crossings to ensure these valves will not be impacted by flood conditions and to allow multiple water crossings to be protected by a single pair of valves.

Sec. 195.402 Procedural Manual for Operations, Maintenance, and Emergencies

PHMSA proposes to revise § 195 .402 to identify the areas requiring an

immediate response by the operator to prevent hazards to the pnblic, property, or the environment if the facilities failed or malfunctioned, including segments that could affect HCAs and segments with valves that are specified in §§ 195.418 and 195.452(i)(4).

PHMSA is also revising§ 195.402 to define the elements that an operator must incorporate when conducting a post-accident analysis of ruptures and other release and failure events involving the activation ofrupture­ mitigation valves. The proposed revision would require the operator to identify potential preventative and mitigative measures that conld be taken to reduce or limit the release volume and damage from similar events in the

future. The post-accident review would address factors associated with this rulemaking, including but not limited to detection and mitigation actions, response time, valve location, valve actuation, and SCADA performance. Upon completion of this post-accident analysis, the operator would be required to develop and implement the lessons learned throughout its suite of procedures, including in pertinent

operator personnel training and qualification programs, and in design, construction, testing, maintenance, operations, and emergency procedure manuals and specifications.

Further, PHMSA is revising§ 195.402 to clarify that requirements to establish liaison with emergency officials must include public safety answering points (9-1-1 emergency call centers) and that requirements for notifying emergency officials when events occur must include notifications to those local public safety answering points.

Section 195.402 also require that emergency procedures provide for rupture detection and valve closure in response to a leakage or failure event, including specific timing provisions relating to ruptures. Specifically, operators must have procedures in place so that they can identify a rupture event within 10 minutes of the initial notification to the operator. This section would also be revised as a matter of minor clarification to incorporate valve shnt-off as an example of an emergency action to minimize the hazards of released hazardous liquid or carbon dioxide to life, property, or the environment.

Sec. 195.418 Valves: Onshore Valve Shut-Off for Rupture Mitigation

Proposed new§ 195.418 would establish an emergency operations standard requiring operators to isolate certain ruptured pipeline segments as

soon as practicable via rupture­ mitigation valves with complete segment isolation within 40 minutes of identifying a rupture. This standard would apply to newly constructed and entirely replaced onshore hazardous liqnid pipelines in HCAs and that could affect HCAs with nominal diameters greater than or equal to 6 inches, and it would also apply to any hazardous liquid pipelines where 2 or more contiguous miles of pipeline with nominal diameters greater than or equal to 6 inches are replaced in HCAs or where they could affect HCAs. This NPRM wonld require that operators designate shut-off segments in these areas and designate mainline valves used to isolate ruptures on those shut­ off segments as rupture-mitigation

7180 Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules

valves. This NPRM would establish maximum distances of 15 miles between rupture-mitigation valves and 7½ miles between rupture-mitigation valves on HVL lines, which are consistent with the proposed spacing requirements of § 195.260. Operators could use AS Vs,

RCVs, an equivalent technology, or manually operated valves (if the operator demonstrates infeasibility of ASVs, RCVs and equivalent technology, that the standard can be achieved under emergency conditions, and provides notification to PHMSA). Operators would also be required to monitor the position and operational status of all rupture-mitigation valves. Operators will be required to meet these provisions within 12 months after the effective date of the final rule.

Sec. 195.420 Valve Maintenance

PHMSA proposes to revise§ 195.420 to incorporate the maintenance, inspection, and operator drills required to ensure operators can close a rupture­ mitigation valve as soon as practicable but within 40 minutes. Demonstration and verification requirements are proposed, including point-to-point verification tests for rupture-mitigation valves that are ASVs or RCVs and initial validation drills and periodic confirmation drills for any manually or locally operated valves identified as rupture-mitigation valves. This section would also require an operator to identify corrective actions and lessons learned resulting from its validation or confirmation drills and share and implement those lessons learned across its entire network of pipeline systems.

Sec. 195.452 Pipeline Integrity Management in High Consequence Areas

PHMSA proposes to revise § 195.452(i)(4) to clarify the existing

requirements for the conduct of EFRD evaluations for HCAs, particularly when operators use EFRDs as rupture­ mitigation valves on applicable lines. Further, the amendments would also require that operators be able to evaluate and demonstrate that they could identify a rupture within 10 minutes in accordance with the proposed § 195.402 and meet the standard specified in the proposed§ 195.418 to isolate shut-off segments that could affect HCAs during rupture events, and the amendments would require that any EFRDs installed on shut-off segments also comply with the design, operation, testing, and maintenance requirements of §§ 195.258, 195,260, 195,402, and

195.420.

VI. Regulatory Analyses and Notices

A. Statuto1y/Legal Authority for This Rulemaking

This NPRl'vf is published under the authority of the Federal Pipeline Safety Law (49 U.S.C. 60101 et seq.). Section 60102 authorizes the Secretary of Transportation to issue regulations

governing the design, installation, inspection, emergency procedures, testing, construction, extension, operation, replacement, and maintenance of pipeline facilities, Tho Secretary delegated this authority to PHMSA at 49 CFR 1.97(a).

B. Executive 01·ders 12866 and 13771, and DOT Regulato1y Policies and Pmcedures

Executive Order 12866 requires agencies to regulate in the "most costθ effective manner," to make a "reasoned determination that the henefits of the intended regulation justify its casts," and to develop regulations that "impose the least burden on society." This NPRM has been determined to be significant under Executive Order 12866 and the Department of Transportation's Regulatory Policies and Procedures. This NPRM has been reviewed by the Office of Management and Budget in accordance with Executive Order 12866 (Regulatory Planning and Review) and

is consistent with the Executive Order 12866 requirements and 49 U.S.C, 60102(b)(5)-(6). Consistent with Executive Order 12866, PHMSA has prepared a preliminary assessment of the benefits and costs of the proposed rule as well as reasonable alternatives, PHMSA anticipates that, if promulgated, this NPRM will provide benefits to the public through more rapid valve closure resulting in better consequence mitigation.

For hazardous liquid pipelines, most damages are calculated by the cost of cleanup and long-term environmental remediation.39 Therefore, a reduction in

the amount of product released from a hazardous liquid pipeline can directly correlate to a reduction in damages. As discussed earlier in this NPRM, in the Enbridge incident near Marshall, MI, the pipeline continued to pump oil for 18 hours hefore valves were closed, resulting in approximately 20,000 barrels of oil being released. With faster rupture detection, pump shutdowns, and valve closures in line with this NPRM, the pipeline would have been isolated 17 hours and 20 minutes

39 PHMSA notes that HVL releases may have similar incident profiles to natural gas transmission pipelinos, as oscaping product can be ignited and causo similar damage via a rupture.

earlier, which would have resulted in a substantially lower spill size, environmental impact, and remedial costs.

Natural gas transmission pipeline incidents result predominately in fatalities, injuries, or property damages that are not linearly related to the quantity of natural gas released. For small incidents and for those incidents in remote locations, damages may be limited to pipeline repair and gos loss costs. Larger incidents, on the other hand, likely involve the ignition of gas and extensive property damage and personal injury, depending on the location of the release and its proximity to buildings, homes, or other areas. A reduction in the cumulative product release over these types of incidents would not necessarily imply avoided damages in the way that it would apply to hazardous liquid pipelines as discussed above. For example, in the PG&E incident, the homes destroyed by

the initial rupture would not have been saved through a more prompt valve closure, However, as discussed earlier in this document, during the 95 minutes it took PG&E to isolate the ruptured segment, the fire resulting from the rupture was being fed by the transmission line, and firefighters could not start firefighting and containment activities until the line was isolated. Earlier valve closure, in that circumstance, could have limited the spread of fire and additional damage beyond the immediate rupture area.

PHMSA estimates that the NPRM will result in annualized costs of approximately $3.1 million per year, calculated ut a 7 percent discount rate. The table below presents the annualized costs for the baseline and this NPRM, at a 3 percent and a 7 percent discount rate:

TABLE 1-ANNUALIZED COSTS OF THE

PROPOSED RULE

[Millions 2015$]

7% 3% System type Discount Discount rate rate

Gas transmission ...... $1.2 $1.0 Hazardous liquid ....... 1.9 1.5

Total .......................... 3.1 2.5

The NPRM is expected to be an E.O. 13771 regulatory action. Details on the estimated costs of this NPRM can be found in the rule's economic analysis.

For more information, please see the PRIA in the docket for this rulemaking.

Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7181

C. Executive OJ'der 13132: Federnlism

PHMSA has analyzed this rulemaking action according to Executive Order 13132 ("Federalism"). While this NPRM may preempt some State requirements, it does not impose any regulation that has substantial direct effects on the States, the relationship between the national government and the States, or the distribution of power and responsibilities among the various levels of government. Therefore, the consultation and funding requirements of Executive Order 13132 do not apply. The pipeline safety laws, specifically 49 U.S.C. 60104(c), prohibit State safety regulation of interstate pipelines. Under the pipeline safety laws, States have the ability to augment pipeline safety requirements for intrastate pipelines, but may not approve safety requirements less stringent than those required by Federal law, A State may also regulate an intrastate pipeline facility PHMSA does not regulate.

D. Regulatory Flexibility Act

The Regulatory Flexibility Act, as amended by the Small Business Regulatory Flexibility Fairness Act of 1996, requires Federal regnlatory agencies to prepare an Initial Regulatory Flexibility Analysis (!RF A) for any proposed rule snbject to notice-and­ comment rulemaking under the Administrative Procedure Act unless the agency head certifies that the rulemaking will not have a significant economic impact on a substantial number of small entities.

PHMSA prepared an !RF A of the potential economic impact on small entities, which is available in the docket for this NPRM. For a worst-case scenario, PHMSA compared compliance costs to estimated sales for bnsinesses, Average annualized costs could exceed 1 percent of sales for 34 (8 percent) of the estimated small gas transmission entities and 12 (19 percent) of the estimated small hazardous liquid operators for a total of 46 (10 percent) entities combined across both sectors. Average annualized costs could exceed 3% of sales for 3 (1 percent) gas transmission operators and 4 (6 percent) hazardous liquid operators, which represent 7 (1 percent) of the total estimated small bnsiness entities,

Due to various uncertainties in the screening analysis {see Table 7 in the IRFA), PHMSA seeks comments regrrrding the impacts of the NPRM on small entities. PHMSA will

subsequently modify the IRF A and make a determination as to whether this NPRM will have a significant economic

impact on a number of small entities at the final rule stage,

E. National Environmental Policy Act

PHMSA analyzed this NPRM in accordance with section 102(2)(c) of the National Environmental Policy Act (42 U.S.C. 4332), the Council on Environmental Quality regulations ( 40 CFR parts 1500-1508), and DOT Order 5610.lC, and has preliminarily determined this action will not significantly affect the quality of the human environment. The Environmental Assessment for this NPRM is in the docket.

F, Executive OJ'deT 13175: Consultation and Coordination With Indian Tlibal Governments

PHMSA has analyzed this NPRM in accordance with the principles and criteria contained in Execntive Order 13175 ("Consultation and Coordination with Indian Tribal Governments"). Because this NPRM is not expected to have Tribal implications and is not expected to impose substantial direct compliance costs on Indian Tribal governments, PHMSA does not anticipate that the funding and consultation requirements of Executive Order 13175 will apply. PHMSA seeks comment on the applicability of the executive order to this NPRM.

G, Executive Order 13211

This NPRM is not anticipated to be a "significant energy action" under Executive Order 13211 (Actions Concerning Regulations That Significantly Affect Energy Supply, Distribntion, or Use). It is not likely to have a significant adverse effect on supply, distribution, or energy use. Further, the Office of Information and Regulatory Affairs has not designated this proposed rule as a significant energy action.

H. Paperwozk Reduction Act

Pnrsnant to 5 CFR 1320.B(d), PHMSA is required to provide interested members of the public and affected agencies with an opportunity to comment on information collection and

recordkeeping requests. PHMSA estimates that the proposals in this NPRM will create the following Paperwork Reduction Act impacts:

PI-llvfSA proposes to create a new information collection to cover the recordkeeping requirement for post­ incident recordkeeping called: "Rupture/Shut-off Valve: Post-Incident Records for Pipeline Operators." PHMSA also proposes to create a new information collection called

"Alternative Technology for Onshore

Rupture Mitigation Notifications" to cover this specific notification requirement.

PHMSA will submit information collection reqnests to the Office of Management and Budget (0MB) for approval based on the requirements that trigger components of the Paperwork Rednction Act in this NPRM. PHMSA will also reqnest two new 0MB Control Numbers for these collections. These information collections are contained in the pipeline safety regulations, 49 CFR parts 190-199, The following information is provided for each of these information collections: (1) Title of the information collection; (2) 0MB control numher; (3) Current expiration date; (4) Type of reqnest; (5) Abstract of the information collection activity; (6) Description of affected public; (7) Estimate of total annnal reporting and recordkeeping burden; and (8)

Frequency of collection. The information collection hnrdens are estimated as follows:

1. Title: "Rnpture/Valve Shnt-off: Post-Incident Records for Pipeline Operators,"

0MB Control NumbeT: Will request one from 0MB.

CwTent Expiration Date: New Collection-To be determined.

Abstract: This NPRM proposes to amend 49 CFR 192.617 and 195.402 to require operators who have experienced a rupture or rupture-mitigation valve shut-off to complete a post-incident summary. The post-incident summary, all investigation and analysis documents used to prepare it, and records of lessons learned must be kept for the life of the pipeline, PHMSA estimates this recordkeeping requirement will result in 50 responses annually and has allotted each respondent 8 hours per response to make and maintain the required records. PHMSA does not currently have an information collection that covers this requirement and will reqnest the approval of this new colleclion, along with a new 0MB Control Number, from the Office of Management and Bndget.

Affected Public: Operators of PHMSA­ regulated pipelines.

Annual Reporting and Recordkeeping Burden:

Total Annual Responses: 50. Total Annual Burden Hours: 400, Frequency of Collection: On occasion. 2, Title: "Alternative Eqnivalent Technology for Onshore Rupture Mitigation Notifications."

0MB Control Number: Will reqnest one from Olvffi.

Current Expiration Date: New Collection-To he determined.

7182 Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules

Abstract: This NPRM proposes a new paragraph (d) in both 49 CFR 192.634 and 195.418 requiring operators who elect to use alternative equivalent technology to notify, in accordance with 192.949, the Office of Pipeline Safety at least 90 days in advance of use. An operator choosing this option must include a technical and safety evaluation, including design, construction, and operating procedures for the alternative equivalent technology to the Associate Administrator of Pipeline Safety with the notification. PHMSA would then have 90 days to object to the alternative equivalent technology via letter from the Associate Administrator of Pipeline Safety; otherwise, the alternative equivalent technology would be acceptable for use. PHMSA estimates this notification requirement will result in 2 responses annually and has allotted each respondent 40 hours per response to conduct this task. PHMSA does not currently have an information collection that covers this requirement and will request the approval of this new collection, along with a new 0MB

Control Number, from the Office of Management and Budget.

Affected Public: Operators of PHMSA­ regulated pipelines.

Annual Repol'ling and Recordkeeping Burden:

Total Annual Responses: 2. Total Annual Burden Hours: 80. Frequency of Collection: On occasion. Requests for copies of these information collections should be directed to Angela Hill, Office of Pipeline Safety (PHP-30), Pipeline and Hazardous Materials Safety Administration, 2nd Floor, 1200 New Jersey Avenue SE, Washington, DC

20590-0001, Telephone: 202-366-1246. Comments are invited on: (a) The need for the proposed collection of information for the proper performance of the functions of the agency, including whether the information will have practical utility;

(b) The accuracy of tho agency's estimate of the burden of the revised colleclion of information, including the validity of the methodology and assumptions used;

(c) Ways to enhance the quality, utility, and clarity of the information to be collected; and

(d) Ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniqnes.

(e) Ways the collection of this information is beneficial or not beneficial to public safety.

Send comments directly to the Office of Management and Dudget, Office of Information and Regulatory Affairs, Attn: Desk Officer for the Department of Transportation, 725 17th Street NW, Washington, DC 20503. Comments should be submitted on or prior to April 6, 2020.

I. Unfunded Mandates Ref01m Act of

1995

The analysis PHMSA performed in accordance with preparing the Preliminary Regulatory Impact Assessment does not expect this NPRM to impose unfunded mandates per the Unfunded Mandates Reform Act of 1995. It is not expected to result in costs of $100 million, adjusted for inflation, or more in any one (1) year to either State, local, or tribal governments, in the aggregate, or to the private sector, and is the least burdensome alternative that achieves the objective of the proposed rulemaking. A copy of the Preliminary Regulatory Impact Assessment is available for review in the docket.

]. Privacy Act Statement

Anyone may search the electronic form of all comments received for any of our dockets. You may review DOT's complete Privacy Act Statement, published on April 11, 2000 (65 FR

19476), in the Federal Register at: https:!!www.govinfo.gov/content/FR- 2000-04-11/pdf/00-8505.pdf.

K. Regulation Identifier Number

A regulation identifier number (RIN) is assigned to each regulatory action listed in the Unified Agenda of Federal Regulations. The Regulatory Information Service Center publishes the Unified Agenda in April and October of each year. The RIN contained in the heading of this document may be used to cross­ reference this action with the Unified Agenda.

List of Subjects

49 CFR Part 192

Gas, Incorporation by reference, Natural gas, Pipeline safety, Reporting and recordkeeping requirements.

49 CFR Parl 195

Anhydrous ammonia, Carbon dioxide, Incorporation by reference, Petroleum, Pipeline safety, Reporting and

recordkeeping requirements.

In consideration of the foregoing, PHMSA proposes to amend 49 CFR parts 192 and 195 as follows:

PART 192-TRANSPORTA TION OF NATURAL GAS AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS

■1, The authority citation for part 192 continues to read as follows:

Authority: 30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101 et. seq., find 49 CFR 1.97. ■2. In§ 192.3, the definition of

"rupture" is added in alphabetical order to read as follows:

§ 192.3 Definitions. * * , , * Rupture means any of the following events that involve an nncontrollod release of a large volume of gas:

(1) A release of gas observed or reported to the operator by its field personnel, nearby pipeline or utility personnel, the public, local responders, or public authorities, and that may be representative of an unintentional and uncontrolled release event defined in paragraphs (2) or (3) of this definition;

(2) An unanticipated or unplanned pressnre loss of 10 percent or greater, occurring within a time interval of 15 minutes or less, unless the operator has documented in advance of the pressure loss the need for a higher pressure­

change threshold dne to pipeline flow dynamics that cause fluctuations in gas demand that are typically higher than a pressure loss of 10 percent in a time interval of 15 minutes or less; or

(3) An unexplained flow rate change, pressure change, instrumentation indication, or equipment function that may be representative of an event defined in paragraph (2) of this definition.

Note: Rupture identification occurs when a rupture, as defined in this section, is first observed by or reported to pipeline operating personnel or a controller. , * * , * ■3. In§ 192.179, paragraph (e) is added to read as follows:

§ 192.179 Transmission line valves. , , * * , (e) All onshore transmission line segments with diameters greater than or equal to 6 inches that are constructed or entirely replaced after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE] must have automatic shutoff valves, remote-control valves, or equivalent technology installed at intervals meeting the appropriate valve spacing requirements of this section. An operator may only install a manual valve under this paragraph if it can demonstrate to PHMSA that installing an automatic shutoff valve, remote-

Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7183

control valve, or equivalent technology would be economically, technically, or operationally infeasible. An operator using alternative equivalent technology or manual valve must notify PHMSA in accordance with the procedure in § 192.634(h). All valves and technology

installed under this paragraph must meet the requiremenls of§ 192.634(c), (d), (f), and (g). ■4. Section 192.610 is added to read as follows:

§192.610 Change in class location:

Change in valve spacing.

If a class location change on a transmission line occurs after

[EFFECTIVE DATE OF FINAL RULE] and results in pipe replacement to meet the maximum allowable operating pressure requirements in§§ 192.611, 192.619, or 192.620, then the requirements in§§ 192,179 and 192.634 apply to the new class location, and the operator must install valves as necessary to comply with those sections. Such valves must be installed within 24 months of the class location change in accordance with§ 192.61 l(d), ■5. In§ 192.615, paragraphs (a)(Z), (6), (8), and (11), and paragraph (c) introductory text are revised to read as follows:

§192.615 Emergency plans.

(a) * * *

(2) Establishing and maintaining adequate means of communication with the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials, to learn the responsibility, resources, jurisdictional area, and emergency contact telephone numbers for both local and out-of-area calls of each government organization that may respond to a pipeline emergency, and to inform the officials abont the operator's ability to respond to the pipeline emergency and means of communication. • • • • •

(6) Taking necessary actions, including but not limited to, emergency shutdown, valve shut-off, and pressure reduction, in any section of the operator's pipeline system to minimize hazards of released gas to life, property, or the environment. Each operator installing valves in accordance with § 192.179(e) or subject to the

requirements in§ 192.634 must also evaluate and identify a rupture as defined in§ 192.3 as being an actual rupture event or non-rupture event in accordance with operating procedures as soon as practicable but within 10 minutes of the initial notification to or

by the operator, regardless of how the

rupture is initially detected or observed. • • • ' ' (8) Notifying the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials, of gas pipeline emergencies to coordinate and share information to determine the location of the release, including both planned responses and actual responses dnring an emergency. The operator (pipeline controller or the appropriate operator emergency response coordinator) must immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call center) or other coordinating agency for the communities and jurisdictions in which the pipeline is located after the operator determines a rnptnre has occurred when a release is indicated and rupture­ mitigation valve closure is implemented. • • ' ' ' (11) Actions required to be taken by a controller during an emergency in accordance with the operator's emergency plans and§§ 192.631 and 192.634, • ' ' ' ' (c) Each operator must establish and maintain liaison with the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials to: ' • ' • ' ■6. Section 192.617 is revised to road as follows:

§ 192.617 Investigation of failures and incidents.

(a) Post-incident procedures. Each operator must establish and follow post­ incident procedures for investigating and analyzing failures and incidents as defined in§ 191.3, including sending the failed pipe, component, or

equipment for laboratory testing or examination, where appropriate, to

determine the causes and contributing factors of the failure or incident and minimize the possibility of a recurrence.

(b) Post-incident lessons learned. Each operator must develop, implement, and incorporate lessons learned from a post-incident review into its procedures, including in pertinent operator

personnel training and qualification programs, and in design, construction, testing, maintenance, operations, and emergency procedure mannals and specifications.

(c) Analysis of rupture and valve slmt­ offs; preventive and mitigative measures. If a failure or incident involves a rupture as defined in§ 192.3

or the closure of a rupture-mitigation valve as defined in§ 192.634, the operator must also conduct a post­ incident analysis of all factors impacting the release volume and the consequences of the release, and identify and implement preventive and mitigative measures to reduce or limit

the release volume and damage in a future failure or incident. The analysis must include all relevant factors impacting the release volume and consequences, including, but not limited to, the following:

(1) Detection, identification, operational response, system shut-off, and emergency response communications, based on the type and volume of the release or failure event;

(2) Appropriateness and effectiveness of procedures and pipeline systems, including SCADA, communications, valve shut-off, and operator personnel;

(3) Actual response time from rupture detection to initiation of mitigative actions, and the appropriateness and effectiveness of the mitigative actions taken;

( 4) Location and the timeliness of actuation of rupture-mitigation valves identified under§ 192.634; and

(5) All other factors the operator deems appropriate.

(d) Rupture post-incident summmy. If a failure or incident involves a rupture as defined in§ 192.3 or the closure of a rupture-mitigation valve as defined in § 192.634, the operator must complete a

summary of the post-incident review required by paragraph (c) of this section within 90 days of the failure or incident, and while the investigation is pending, conduct qnarterly status reviews until completed. The post-incident summary and all other reviews and analyses

produced under the requirements of this section must be reviewed, dated, and signed by the appropriate senior executive officer. The post-incident summary, all investigation and analysis documents used to prepare it, and records of lessons learned must be kept for the useful life of the pipeline. ■7. Section 192.634 is added to read as follows:

§ 192.634 Transmission lines: Onshore valve shut-off for rupture mitigation.

(a) Applicability. For onshore transmission pipeline segments with nominal diameters of 6 inches or greater in high consequence areas or Class 3 or Class 4 locations that are constructed or where 2 or more contiguous miles have been replaced after [DA TE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE], an operator must install rupture­ mitigation valves according to the requirements of this section. Rupture-

7184 Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules

mitigation valves must be operational within 7 days of placing the new or replaced pipeline segment in service.

(b) Maximum spacing between valves. Rupture-mitigation valves must be

installed in accordance with the following requirements:

(1) High Consequence Areas. For purposes of this paragraph (b)(1), "shut­ off segment" means the segment of pipe located between the upstream mainline valve closest to the upstream high consequence area segment endpoint and the downstream mainline valve closest to the downstream high consequence area segment endpoint so that the entirety of the high consequence area segment is between at least two rupture­ mitigation valves. If any crossover or

lateral pipe for gas receipts or deliveries connects to the shut-off segment between the upstream and downstream mainline valves, then the segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed, there is no flow path for gas to he transported to the rupture site (except for residual gas already in the shut-off segment). All such valves on a shut-off segment am ''rupture-mitigation valves." Multiple high consequence areas may be contained within a single shut-off segment. The distance between rupture-mitigation valves for each shut­ off segment must not exceed:

(i) 8 miles if one or morn high consequence areas in tho shutoff segment is in a Class 4 location;

(ii) 15 miles if one or more high consequence areas in the shntoff segment is in a Class 3 location, and

(iii) 20 miles if all high consequence areas in the shutoff segment are located in Class 1 or 2 locations, or

(iv) The mainline valve spacing requirements of§ 192.179 when mainline valve spacing does not meet § 192.634(b)(1)(i), (ii), or (iii).

(2) Class 3 locations. For purposes of this paragraph, "shut-off segment" means the segment of pipe located between the upstream mainline valve closest to the upstream endpoint of the Class 3 location and the downstream mainline valve closest to the downstream endpoint of the Class 3 location so that the entirety of the Class

3 location is between at least two ruptnre-mitigation valves. If any crossover or lateral pipe for gas receipts or deliveries connects to the shut-off segment between the upstream and

downstream mainline valves, the shnt­ off segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed, there is no flow path for gas to be transported to the rupture site

(except for residual gas already in the shut-off segment). AH such valves on a shut-off segment are "rupture-mitigation valves." Multiple Class 3 locations may be contained within a single shnt-off segment. The distance between mainline valves serving as rupture­ mitigation valves for each shut-off segment mnst not exceed 15 miles.

(3) Class 4 locations. For purposes of this paragraph, "shut-off segment" means the segment of pipe between the upstream mainline valve closest to the upstream endpoint of the Class 4 location and the downstream mainline valve closest to the downstream endpoint of the Class 4 location so that the entirety of the Class 4 location is between at least two rupture-mitigation valves. If any crossover or lateral pipe for gas receipts or deliveries connects to the shnt-off segment between the upstream and downstream mainline valves, the shut-off segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed, there is no flow path for gas to be transported to the rnpture site (except for residual gas already in the shut-off segment), All such valves on a shut-off segment are "rupture-mitigation valves." Multiple Class 4 locations may be contained within a single shut-off segment. The distance between mainline valves serving as rnpture­ mitigation valves for each shut-off segment must not exceed 8 miles.

(4) Laterals. Laterals extending from shut-off segments that contribute less than 5 percent of the total shut-off segment volume may have rupture­ mitigation valves that meet the act.nation requirements of this section al locations other than mainline receipt/ delivery points, as long as all of these laterals contribnting gas volumes to the shnt-off segment do not contribute more than 5 percent of the total shut-off segment gas volume, based upon maximum flow volume at the operating pressure.

(c) Valve slrnt-offtime for rupture mitigation. Upon identifying a rupture, the operator must, as soon as practicable:

(1) Commence shut-off of the ruptnre­ mitigation valve or valves which would have the greatest effect on minimizing the release volume and other potential safety and environmental conseqnences of the discharge to achieve foll ruptnre­ mitigation valve shut-off within 40 minutes of rupture identification; and

(2) Initiate other mitigative actions appropriate for the situation to minimize the release volume and potential adverse conseqnences.

(d) Valve slrnt-off capability. Onshore transmission line rupture-mitigation valves must have actuation capability (i.e., remote-control shut-off, automatic shut-off, equivalent technology, or manual shut-off where personnel are in proximity) to ensnre pipeline rnptnres are promptly mitigated based upon maximum valve shut-off times, location,

and spacing specified in paragraphs (h) and (c) of this section to mitigate the volume and consequence of gas released.

(e) Valve shut-off methods. All onshore transmission line ruptnre­ mitigation valves must be actuated by one of the following methods to mitigate a rupture as soon as practicable but within 40 minutes of rupture identification:

(1) Remote control from a location that is continuonsly staffed with personnel trained in rupture response to provide immediate shut-off following identification of a ruptnre or other decision to close the valve;

(2) Automatic shut-off following identification of a rupture; or

(3) Alternative equivalent technology that is capable of mitigating a rupture in accordance with this section.

(4) Mannal operation npon identification of a rupture. Operators using a manual valve in accordance with§ 192.179(e), must appropriately station personnel to ensure valve shut­ off in accordance with paragraph (c) of this section. Manual operation of valves mnst inclnde time for the assembly of necessary operating personnel, the acquisition of necessary tools and eqnipment, driving time nuder heavy traffic conditions and at the posted speed limit, walking time to access the valve, and time to manually shut off all valves, not to exceed the 40-minute total response time in paragraph (c)(1) of this section.

(f) Valve monitoTing and operation capabilities. Onshore transmission line rupture-mitigation valves actuated by methods in paragraph (e) of this section mnst be capable of being:

(1) Monitored or controlled by either remote or onsite personnel;

(2) Operated during normal, abnormal, and emergency operating conditions;

(3) Monitored for valve status (i.e., open, closed, or partial closed/open), npstream pressure, and downstream pressure. Pipeline segments that use manual valve operation must have the capability to monitor pressnres and gas flow rates on the pipeline to be able to identify and locate a rupture;

(4) Initiated to close as soon as practicable after identifying a rnptnre and with complete valve shut-off within

Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7185

40 minutes of rupture identification as specified in paragraph (c) of this section; and

(5) Monitored and controlled by remote personnel or must have a back­ up power source to maintain SCADA or other remote communications for remote control shnt-off valve or automatic shut-off valve operational status.

(g) Monitoring of valve shut-off response status. Operating control personnel must continually monitor rupture-mitigation valve position and

operational status of all rupture­ mitigation valves for the affected shut­ off segment during and after a rupture event until the pipeline segment is isolated. Such monitoring must be maintained through continual electronic communications with remote instrumentation or through continual verbal communication with onsite personnel stationed at each rupture­ mitigation valve, via telephone, radio, or equivalent means.

{h) Alternative equivalent technology or manual valves foT onshore transmission rupture mitigation, If an operator elects to use alternative equivalent technology or manual valves in accordance with§ 192,179{e), the operator must notify PHMSA at least 90 days in advance of installation or use in accordance with§ 192.949. The operator must include a technical and safety evaluation in its notice to PHMSA, including design, construction, and operating procedures for the alternative equivalent technology or manual valve. Operators installing manual valves must also demonstrate that installing an automatic shutoff valve, a remote­ control valve, or equivalent technology would be economically, technica1ly, or operationally infeasible. An operator

may proceed to use the alternative equivalent technology or manual valves 91 days after submitting the notification unless it receives a letter from the Associate Administrator of Pipeline Safety informing the operator that PHMSA objects to the proposed use of the alternative equivalent technology or manual valves or that PHMSA requires additional time to conduct its review. ■8. In§ 192.745 paragraphs (c), (d), and (e) are added to read as follows:

§192.745 Valve maintenance: Transmission lines.

* * * , , (c) For each valve installed under § 192. 179(e) and each rupture-mitigation

valve under§ 192.634 that is a remote control shut-off or automatic shut-off valve, or that is based on alternative equivalent technology, the operator must conduct a point-to-point

verification between SCADA displays and the mainline valve, sensors, and communications equipment in accordance with§ 192.631(c) and (e),

(d) For each rupture-mHigation valve under§ 192.634 that is manually or locally operated:

(1) Operators must establish the 40- minute total response lime as required by§ 192.634 through an initial drill and through periodic validation as required in paragraph (d)(Z) of this section. Each phase of the drill response must be reviewed and the results documented to validate the total response time, including valve shut-off, as being less than or equal to 40 minutes following rupture identification.

(2) A mainline valve serving as a rupture-mitigation valve within each pipeline system and within each

operating or maintenance field work unit must be randomly selected for an

annual 40-minute total response time validation drill that simulates worst­ case conditions for that location to ensure compliance. The response drill must occur at least once each calendar year, with intervals not to exceed 15 months.

(3) If the 40-minute maximum response time cannot be validated or achieved in the drill, the operator mu.st revise response efforts to achieve compliance with § 192.634 no later than

6 months after the drill. Alternative valve shut-off measures must be in place in accordance with paragraph (e) of this section within 7 days of a failed drill.

(4) Based on the results of respon.se­ time drills, the operator must include lessons learned in:

(i) Training and qualifications programs; and

(ii) Design, construction, testing, maintenance, operating, and emergency procedures manuals; and

(iii) Any other areas identified by the operator as needing improvement.

(e) Each operator must take remedial measures to correct any valve installed under§ 192.179(c) or any rupture­ mitigation valve identified in§ 192.634 that is found to be inoperable or unable to maintain shut-off, as follows:

(1) Repair or replace the valve as soon as practicable but no later than 6 months after finding that the valve is inoperable or unable to maintain shut­ off; and

(2) Designate an alternative compliant valve within 7 calendar days of the finding while repairs are being made, ■9. In§ 192.935, paragraph (c) is revised to read as follows:

§ 192.935 What additional preventive and mitigative measures must an operator take? * , , , *

(c) Risk analysis for gas releases and protection against ruptures. If an operator determines, based on a risk analysis, that an automatic shut-off valve (ASV) or remote-control valve (RCV) wonld ho an efficient means of adding protection to a high consequence

area in the event of a gas release, an operator mu.st install the ASV or RCV, In making that determination, an operator must, at least, consider the following factors-swiftness of leak detection and pipe shutdown capabilities, the type of gas being

transported, operating pressure, the rate of potential release, pipeline profile, the potential for ignition, and location of nearest response personnel.

( 1) Protection of onshore transmission high consequence areas from ruptures. An operator of an onshore transmission pipeline segment that is constructed, or that has 2 or more contiguous miles replaced, after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE] and is greater than or equal to 6 inches in nominal diameter and is

located in a high consequence area must provide for the additional protection of those pipeline segments to assure the timely termination and mitigation of rupture events by complying with §§ 192.615(a)(6), 192.634, and 192.745.

At a minimum, the analysis specified in paragraph (c) of this section must demonstrate that the operator can achieve the following standards for termination of rupture events:

(i) Operators must identify a rupture event as soon as practicable hut within 10 minutes of the initial notification to or by the operator, in accordance with § 192.615(a)(6), regardless of how the

rupture is initially detected or observed;

(ii) Operators must begin closing shut­ off segment rupture-mitigation valves as soon as practicable after identifying a rupture in accordance with§ 192.634; and

(iii) Operators must achieve complete segment shut-off and isolation as soon as practicable after rupture detection but within 40 minutes of ruptnre identification in accordance with § 192.634.

(2) Compliance deadlines. The risk analysis and assessments specified in paragraph (c) of this section mu.st he completed prior to placing into service onshore transmission pipelines

constructed or where 2 or more contiguous miles have been replaced

after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE]. Implementation of risk analysis and assessment findings for rupture­ mitigation valves must meet§ 192,634.

(3) Periodic evaluations. Risk analyses and assessments conducted under

7186 Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules

paragraph (c) of this section must be reviewed by the ope,rator for new or existing operational and integrity matters that would affect rupture mitigation on an annual basis, not to exceed a period of 15 months, or within 3 months of an inctldent or safetyᆊrelated condition, as those lerms are defined al §§ 191.3 and 191.23, respectively, and certified by the signature of a senior executive of the company. • • • '

PART 1 95-TAANS POATATION OF HAZARDOUS LIQUIDS BY PIPELINE

■10, The authority citation for parl 195 continues to read as follows:

Authority: 30 lJ.S.C. 185{wJ(3), 49 U.S.G 5103, 60101 et seq., and 49 CFR 1.97. • 11. In § 195.2, the definition for "rupture" is added in alphabetical order to read as follows;

§ i 95.2 Definitions.

* * • • Rupturn mearni any of the following events that .involve an uncontrolled release of a large volume of hazardous liquid or carbon dioxide:

{1] A release of hazardous liqnid or carbon dioxide observed and reported to the opcrntor by its field personnel, nearby pipeline or utility personnel, the public, local responders, or public authorities, and that may be representative of an unintentional and

uncontrolled release event defined in paragraphs (21 or (3) of this definition;

(2) An unanticipated or nnplanned flow rate change of 10 percent or greater or a pressure Joss of 10 percent or greater, occurring within a time interval of 15 minutes or less) unless the operator has documented in advance of the flow rate change or pressure loss the need for a higher flow rate change or

higher prossureᆋchange threshold due to pipeline flow dynamics and terrain

elevation changes that cause fluctuations in hazardous liquid or carbon dioxide flow that are typically higher than a flow rate change or pl'essure loss of 10 percent in a time interval of 15 minutes or less; or

{3} An unexplained flow rate change, pressure change1 instrumentation indication or equipment function that may be representative of an event defined in paragraph (2) of this definition.

§ 195.258 Valves: General, • * * • (c) A11 onshore hazardous Hquid nr carbon dioxide pipeline segments with diameters greater U1an or equal to 6 inches that are constructed or entirely replaced after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL H.ULE] must have automatic shutoff valves, romoteᆌcontrol valves, or

eqnivaleut technology installed at intervals meeting the appropriate valve location and spacing requirements of this section and § 195.2f:l0, An operator may only install a manual valve nuder this paragraph 1f it can dt'mtmslrate to PHMSA that installing an automatic shutoff valve, rcmole-control valve, or

equivalent technology would be economically, technically, or nperationally infeasible, An operator installing alt\>,rnalive equivalent technology or manual valves m1:st

notify PHMSA in accordance witb tho procedure at § 195,418(h). Valves and technology insta11ed under this section must meet tho requirements of § 195,418(c], (d), (fl, and (g), • 13. ln § 195.260, paragraphs (c) and (e) are revised and paragraphs (g) and (h) are added to read as fo11ows:

§195.260 Valves: Location. • • • • (c} On each mainline at locations along the pipeline system that will minimize or prevent safety risks, property daiilllge, or environmental harm from accidental hazardous liquid or carbon dioxide discharges, as appropriate for onshore areas, offshore areas, or high consequence areas. For onshore pipeliner constructed or that have had 2 or more contiguous miles replaced after [DATE l2 MONTHS AFTER llFFECTIVE DA TE OF FINAL

RULE)i mainline valve spacing must not exceed 15 miles for pipeline segments that could affect high consequence areas

(as defined in § 195.450) and 20 miles for pipeline segments that could not affect high consequence areas. Valves protecting high consequence areas mnst be located as determined by the operator's process for identifying preventive and mitigative measures estahlishod in § 195.452(i) and by using a process, such as is set forth in Section LB of Appendix C of part 195, but with e maximum distance from the high consequence area segment endpoints

that doos not exceed 71/2 miles. • • Note: Rupture identification occurs when a * rupture, ns defined in this section, is first observed by or reported to pipeline operating (e) On each side of a water crossing that is more than 100 feet (30 meters)

wide from high-waler mark to high­ water mark as follows, unless the Associate Administrator finds nndel' paragraph (e)(3) of this section that

personnel or fl controller.

• * • * • • 12. ln § 195.258, paragraph (c) is added to read as follows:

valves or valve spacing is not necessary in a particular case to achieve an equivalent level of safety:

(1 ) Valves must either be located outoide of the flood plain nr have valve actuators and other control equipment installed to not be impacted by flood conditions; and

(2) For multiple water c:rossings1 valves must bo located on the pipeline

upstream and downstream of the first and last water crossings so that the total distance bet\•veen the first upstream valve and last downstream valve does not exceed 1 mile,

(3) An operator may notify PHMSA in accordance with paragraph (hl of this section if in a particular case the valves or valve spacing required by this paragraph is not necessary to achieve an equivalent level of safety. Unless the Associate Administrator finds in that particular case tho valves or valve spacing required by this paragraph are not necessary to achieve an equivalent level of safety, the opera.tor must comply with the valve and valvo spacing requirements of this paragraph. * * ' •

(g) On each mainline highly volatile liquid (HVL) pipeline that is located in

a high population area or other popnlaled area as defined in § 195 .450 and that is constructed or that has 2 or more contignous miles replaced after

[DA TE 12 :v!ONTHS AFTER EFFECTIVE DATE OF FINAL RULE], with a maximum valve spacing of 7½ miles, unless the Associate Adminislrator finds in a particular case that this valve spacing is not necessaxy to achieve an equivalent level of safety. An operator may notify PHMSA in accordance with paragraph (h) of this section if in a particular case the valve spacing required hy this paragraph is not necessary to achieve an equivalent level of sofoty. If the Associate Administrator informs an operator that PHMSA objects, the operator must comply with the valve spacing :requirements of this paragraph.

(h} An operator must provide any notification required hy this section by;

(1) Sending !lie notification by electronic mail to InfOl'mationResourccsManager@dot.gov; or

{2) Sending the notification by mail to A TIN: Infonnation Resources Manager, DOT/PHMSAIOPS, East Building, 2nd Floor, E22-321, 1200 New Jersey Ave. SE, Washington, DC 2059:0. • 14. ln § 195.402, paragraphs (c)(4), (5), and (12), and (e)(l), (4). (7), and (10) are revised to read as foIIows:

Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules 7187

§ 195.40 2 Procedural manual tor operations, maintenance, and emergencies. • • • • •

(c) * * * (4) Determining which pipeline facilities arc in areas that would require an immediate response by the operator lo prevent hazards to the public, property, OT the environment if the facilities failed or malfunctioned, including segments that could affect high consequence areas and valves specified in either§§ 195.418 or 195.452(i)(4). (5) Investigating and analyzing pipeline accidents and failures, including sending the failed pipe, component, or equipment for laboratory testing or examination where appropriate, to determine the causes and contributing factors of the failure and minimize the possibility of a recurrence.

(i) Post-incident lessons learned. Each operator must develop, implement, and

incorporate lessons learned from a post­ accident review into its procedures, including in pertinent operator personnel Lraining and qualifications programs and in design, construction, testing, maintenance, operations, and

emergency procedure manuals and specifications.

(ii) Analysis of rupture and valve shut-offs; preventive and mitigative measures. If a failure or accident involves a ruptnre as defined in§ 195.2 or a rupture-mitigation valve closure as defined in§ 195.418, the operator mnst also conduct a post-accident analysis of all factors impacting tho release volume and the consequences of the release, and identify and implement preventive and mitigative measures to reduce or limit the release volume and damage in a future failure or incident. The analysis must include all relevant factors impacting the release volume and consequences, including, but not limited to, the following:

(A) Detection, identification, operational response, system shut-off, and emergency-response communications, based on the type and volume of the release or failure event;

(B) Appropriateness and effectiveness of procedures and pipeline systems, including SCADA, communications, valve shut-off, and operator personnel;

(C) Actual response time from rupture identification to initiation of mitigative actions, and the appropriateness and effectiveness of the mitigative actions taken;

(D) Location and the timeliness of actuation of all rupture-mitigation valves identified under§ 195.418; and

(E) All other factors the operator deems appropriate.

(iii) Rupture post-incident summmy. If a failure or incident involves a rupture as defined in§ 195.2 or tho closure of a rupture-mitigation valve as defined in§ 195,418, the operator must complete a summary of the post­ accident review required by paragraph (c)(5)(ii) of this section within 90 days of the failure or incident, and while the investigation is pending, conduct

quarterly status reviews until completed. The post-incident summary and all other reviews and analyses produced under the requirements of this section must be reviewed, dated, and signed by the appropriate senior executive officer. The post-incident summary, all investigation and analysis documents used to prepare it, and records of lessons learned must be kept for the useful life of the pipeline. • • • • •

(12) Establishing and maintaining adequate means of communication with the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials, to learn the responsibility, resources, jnrisdictional area, and emergency contact telephone numbers for both local and out-of-area calls of each government organization that may respond to a pipeline emergency, and to

inform the officials about the operator's ability to respond to the pipeline emergency and means of communication. • • • • •

(e) * * *

(1) Receiving, identifying, and classifying notices of events that need immediate response by the operator or notice to the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other appropriate public officials, and communicating this information to appropriate operator personnel for corrective action, • • • • •

(4) Taking necessary actions, including but not limited to, emergency

shutdown, valve shut-off, and pressure reduction, in any section of the

operator's pipeline system to minimize hazards of released hazardous liquid or carbon dioxide to life, property, or the environment. Each operator installing valves in accordance with§ 195.258(c) or subject to the requirements in § 195,418 must also evaluate and

identify a rupture as defined in§ 195.2 as being an actual rupture event or non­ rupture event in accordance with operating procedures as soon as practicable bnt within 10 minutes of the initial notification to or by the operator,

regardless of how tbe rupture is initially detected or observed. • • * • * (7) Notifying the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, polico, and other public officials, of hazardous liquid or carbon dioxide pipeline emergencies to coordinate and share information to determine the location of the release, including both planned responses and actual responses during an emergency, and nny additional precantions necessary for an emergency involving a pipeline

lransporting a highly volatile liquid. The operator (pipeline conlroller or the appropriate operator emergency response coordinator) must immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call center) or other coordinating agency for the communities and jurisdictions in which the pipeline is located after the operator determines a rnpture has occurred when a release is indicated and valve closure is implemented. • • • • * (10) Actions required to be taken by a controller during an emergency, in accordance with the operator's emergency plans and§§ 195.418 and 195.446. • • • • * ■15. Section 195,418 is added to read as follows:

§ 195.418 Valves: Onshore valve shut-off for rupture mitigation.

(a) Applicability. For onshore pipeline segments that could affect high consequence areas with nominal diameters of 6 inches or greater, that are constructed or where 2 or more contiguous miles are replaced after [DATE 12 MONTHS AFTER THE EFFECTIVE DA TE OF THE RULE], an operator must install rupture-mitigation valves according to the requirements of this section and§ 195.260. Rnpture­ mitigation valves must be operational within 7 days of placing the new or replaced pipeline segment in service.

(b) Maximum spacing between valves. Rnpture-mitigation valves must be installed in accordance with the following requirements:

(1) For purposes of this section, a "shut-off segment" means the segment of pipe located between the upstream mainline valve closest to the upstream high consequence area segment endpoint and tho downstream mainline valve closest to the downstream high consequence area segment endpoint so that the entirety of the segment that could affect the high consequence area

7188 Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules

is between at least two rupture­ mitigation valves, If any crossover or

lateral pipe for commodity receipts or deliveries connects to the shut-off segment between the upstream and downstream mainline valves, the segment also extends to the nearest valve on the crossover connection(s) or

lateral(s), such that, when a11 valves are closed, there is no flow path for commodity to be transported to the rupture site {except for residual liquids already in the shut-off segment). All such valves on a shut-off segment are

"rupture-mitigation valves," Multiple high consequence areas may be contained within a single shut-off segment. All replacement pipeline segments that are over 2 continuous miles in length and could affect a high consequence area must include a minimum of one mainline valve that meets the requirements of this section. The distance between rupture­ mitigation valves in high consequence areas for each shut-off segment must not exceed 15 miles, with a maximum distance not to exceed 7½ miles from the endpoints of a shut-off segment. Valves on lines carrying highly volatile liquids in high population areas and other populated areas, as those terms are defined in§ 195.450, must have rupture­ mitigation valves spaced at a maximum distance not exceeding 7½ miles.

(2) Lateral lines to shut-off segments that contribute less than 5 percent of the

total shut-off segment commodity volume may have lateral rupture­ mitigation valves that meet the actuation requirements of this section at locations other than mainline receipt/ delivery points, as long as all of these laterals contributing hazardous liquid or

carbon dioxide volumes to tho shut-off segment do not contribute more than 5 percent of the total shut-off segment

commodity volume based upon maximum flow gradients and terrain.

(c) Valve shut-off time fo1· rupture mitigation. Upon identifying a rupture, the operator must, as soon as practicable:

(1) Commence shut-off of the rupture­ mitigation valve or valves that would have the greatest effect on minimizing the release volume and other potential safety and environmental consequences of the discharge to achieve full rupture­ mitigation valve shut-off within 40 minutes of rupture identification; and

(2) Initiate other mitigative actions appropriate for the situation to minimize the release volume and potential adverse consequences.

(d) Valve shut-off capability. Onshore rupture-mitigation valves must have actuation capability (i.e., remote control shut-off, automatic shut-off, equivalent

technology, or manual shut-off where personnel are in proximity) to ensure pipeline ruptures are promptly mitigated based upon maximum valve shut-off times, location, and spacing specified in paragraphs (b) and (c) of this section to mitigate the volume and consequence of hazardous liquid or carbon dioxide released.

(e) Valve shut-off methods. All onshore rupture-mitigation valves must be actuated by one of the following methods to mitigate a rupture as soon as practicable but within 40 minutes of

rupture identification:

l1) Remote control from a location that is continuously staffed with personnel trained in rupture response to provide immediate shut-off following identification of a rupture or other decision to close the valve;

(2) Automatic shut-off following an identification of a rupture; or

(3) Alternative equivalent technology that is capable of mitigating a rupture in accordance with this section.

(4) Manual operation upon identification of a rupture. Operators

using a manual valve in accordance with§ 195.258 must appropriately station personnel lo ensure valve shut΄ off in accordance with paragraph (c) of this section. Manual operation of valves must include time for the assembly of necessary operating personnel,

acquisition of necessary tools and equipment, driving time under heavy traffic conditions and at the posted speed limit, walking time to access the valve, and time to manually shut off all valves, not to exceed a 40-minute total response time in paragraph (c)(1) of this section.

(f) Valve monitoring and operation capabilities. Onshore rupture-mitigation valves actuated by methods in paragraph (e) of this section must be capable of being:

(1) Monitored or controlled by either remote or onsite personnel;

(2) Operated during normal, abnormal, and emergency opemting conditions;

(3) Monitored for valve status (i.e., open, closed, or partial closed/open), upstream pressure, and downstream pressure. Pipeline segments that use manual valve operation must have the capability to monitor pressures and gas flow rates on the pipeline to be able to identify and locate a rupture;

(4) Initiated to close as soon as practicable after identifying a rupture and with complete valve shut-off within 40 minutes of rupture identification as specified in paragraph (c)(l) of this section; and

(5) Monitored and controlled by remote personnel or must have a back-

up power source to maintain SCADA or other remote communications for remote control shut-off valve or automatic shut-off valve operational status.

(g) .Monitoring of valve shut-off rnsponse status. Operating control personnel must continually monitor rupture-mitigation valve position and operational status of all rupture­ mitigation valves for the affected shut­ off segment during and after a rupture event until the pipeline segment is isolated. Such monitoring must be maintained through continual electronic communications with remote instrumentation or through continual verbal communication with onsite personnel stationed at each rupture­ mitigation valve, via telephone, radio, or equivalent means.

(h) Alternative equivalent technology or manual valves for onshore rupture mitigation. If an operator elects to use alternative equivalent technology or manual valves in accordance with § 195.258(c), the operator must notify

PHMSA at least 90 days in advance of installation or use in accordance with § 195,452(m). The operator must include

a technical and safety evaluation in its notice to PHMSA, including design, construction, and operating procedures for the alternative equivalent technology or manual valve. Operators installing manual valves must also demonstrate that installing an automatic shutoff valve, a remote-control valve, or equivalent technology in lieu of a manual valve would he economically, technically, or operationally infeasible. An operator may proceed to use the alternative equivalent technology or manual valves !J1 days after submitting the notification unless it receives a letter from the Associate Administrator of Pipeline Safety informing the operator that PHMSA objects to the proposed use of the alternative equivalent technology or manual valves or that PHMSA requires additional time to conduct its review.

16. In§ 195.420, paragraph (b) is revised and paragraphs (d), (e), and (f) are added to read as follows:

§ 195.420 Valve maintenance. • • • • • (b) Each operator must, at intervals not exceeding 7½ months but at least twice each calendar year, inspect each mainline valve to determine that it is functioning properly. Each valve installed under§ 195.258(c) or rupture­ mitigation valve, as defined under § 195.418, must also be partially

operated as part of tho inspection. • * • * •

Federal Register/Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules 7189

(d) For each valve installed under § 195,258(c) or onshore rupture­

mitigation valve identified under § 195.418 that is remote-control shut-off,

automatic shut-off, or that is based on alternative equivalent technology, the operator must conduct a point-to-point verification between SCADA displays and the mainline valve, sensors, and communications equipment in accordance with§ 195.446(c) and (e), or perform an equivalent verification.

(e) For each onshore rupture­ mitigation valve identified under § 195.418 that is to be manually or

locally operated:

(1) Operators must establish the 40- minute total response time as required by§ 195.418 through an initial drill and through periodic validation as required by paragraph (e)(2) of this section. Each phase of the drill response must be reviewed and the results documented to validate the total response time, including valve shut-off, as being less than or equal to 40 minutes.

(2) A rupture-mitigation valve within each pipeline system and within each operating or maintenance field work unit must be randomly selected for an

annual 40-minute total response time validation drill simulating worst-case conditions for that location to ensure compliance. The response drill must occur at least once each calendar year, with intervals not to exceed 15 months.

(3) If the 40-minute maximum response time cannot be validated or achieved in the drill, the operator must revise response efforts to achieve compliance with§ 195.418 no later than 6 months after the drill. Alternative valve shut-off measures must be in accordance with paragraph (f) of this section within 7 days of the drill.

(4) Based on the results of response­ time drills, the operator must include lessons learned in:

(i) Training and qualifications programs; and

(ii) Design, construction, testing, maintenance, operating, and emergency procedures manuals.

(iii) Any other areas identified by the operator as needing improvement.

{f) Each operator must take remedial measures to correct any onshore valve installed under§ 195.258{c) or rupture­ mitigation valve identified under § 195.418 that is found inoperable or

unable to maintain shut-off as follows:

(1) Repair or replace the valve as soon as practicable but no later than 6 months after the finding; and

(2) Designate an alternative compliant valve within 7 calendar days of the finding while repairs are being made. Repairs must be completed within 6 months, ■17. In§ 195.452, paragraph (i)(4) is revised to read as follows:

§ 195.452 Pipeline integrity management in high consequence areas. • • * • • (i) * * * (4) Emergency Flow Restricting Devices {EFRD). If an operator determines that an EFRD is needed on a pipeline segment to protect a high consequence area in the event of a hazardous liquid pipeline release, an operator must install the EFRD. In making this determination, an operator must, at least, consider the following factors-the swiftness of leak detection and pipeline shutdown capabilities, the type of commodity carried, the rate of potential leakage, the volume that can

be released, topography or pipeline profile, the potential for ignition,

proximity to power sources, location of

nearest response personnel, specific terrain between the pipeline segment and tho high consequence area, and

benefits expected by reducing the spill size.

(i) Where EFRDs are installed to protect HCAs on all onshore pipelines with diameters of 6 inches or greater and that are placed into service or that have had 2 or more contiguous miles of pipe replaced after [insert date 12 months after effective date of this rule], the location, installation, actuation, operation, and maintenance of such EFRDs (including valve actuators,

personnel response, operational control centers, SCADA, communications, and procedures) must meet the design, operation, testing, maintenance, and rupture mitigation requirements of §§ 195.258, 195.260, 195.402, 195.418,

and 195.420.

(ii) The EFRD analysis and assessments specified in paragraph (i)( 4) of this section mnst be completed prior to placing into service all onshore pipelines with diameters of 6 inches or greater and that are constructed or that have had 2 or more contiguous miles of pipe replaced after [insert date 12 months after effeclive date of this rule], Implementation of EFRD findings for rupture-mitigation valves must meet § 195.418. • • • • •

Issued in Washington, DC on January 23, 2020, under authority delegated in 49 CFR part 1.97. Alan K. Mayberry, Associate Administrator for Pipeline Safety,

[FR Doc. 2020-01459 Filed 2-5-20; 8:45 amJ

BILLING CODE 4910-60-P