Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, April 21, 2020
7:00 PM
During this tele-conference BOS meeting, public comment will be handled as follows:
• Participants are asked to call in by 6:55 pm. • EMAIL questions to info@eastgoshen.org • Participants will be asked to identify themselves when being accepted into the meeting • The public will be muted during the meeting when the Board is talking. • For each agenda item that requires a Board vote, the public will be unmuted and given an opportunity to comment and ask questions. • Participants wishing to comment must state their name and must speak one at a time. • Participants are asked to turn down the volume if they are livestreaming the meeting on Youtube.
1. Call to Order (7:00 PM)
2. Pledge of Allegiance 3. Moment of Silence 4. Announce that the meeting is being livestreamed 5. Public Hearing- None 6. Chairman's Report a. The Summer Newsletter will be issued electronically and posted on our web site. 7. Emergency Services Reports (7:05 PM to 7:10 PM) a. WEGO - Chief Brenda Bernot b. Goshen Fire Co - None c. Malvern Fire Co - None d. Good Fellowship - None e. Fire Marshal - None 8. Financial Report-March 2020 (7:10 PM to 7:15 PM) 9. Approval of Minutes and Treasurer's Report (7:15 PM to 7:20 PM) a. Minutes -April 14, 2020 b. Treasurers Reports -April 16, 2020 10. Old Business a. Consider replacement of Stair Treads (7:20 PM to 7:30 PM) 11. New Business a. Consider rescheduling Community Day (7:30 PM to 7:40 PM) b. Consider Application for Sol Smart (7:40 PM to 7:50 PM) c. Consider Stormwater Management Agreements for 1527 Meadowbrook Lane and 37 Meadow Creek Lane. (7:50 PM to 7:55 PM) d. Consider extending discount window for the property tax. (7:55 PM to 8:05
PM) e. Consider proposal to prepare appraisals for the Paoli Pike Trail/ Segment B. (8:05 to 8:10 PM). f. Consider Paoli Pike Right of Way Acceptance (8:10 to 8:15) 12. Any Other Matter 13. Public Comment- (8:15 PM to 8:45 PM) 14. Liaison Repo1ts - none
AGENDA Page -1- April 21, 2020
15. Correspondence, Reports oflnterest (8:45 PM to 8:50 PM) a. April 7, 2020 - Notice if Intent from Texas Eastern Transmission to apply for a
General Permit for a repair of their transmission line. Adjournment (8:50 PM)
Meetings & Dates of Importance
Apr 22, 2020
Apr 27, 2020 Apr 27, 2020
Police Commission - Go To Meeting Meeting Notice attached Pension Committee - Zoom Teleconference Sustainability Advisory Committee - Zoom Teleconference
Newsletter Deadline for Summer 2020: May 27, 2020
04:00pm
02:00pm 07:00pm
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant.
Public Comment - Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting. The Board of Supervisors will allocate a maximum of 3 0 minutes for public comment at the beginning of each meeting. If necessary, there will be a second period for public comment prior to the end of the meeting.
Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the "E-notification & Emergency Alert" button on the left side of the homepage.
ReadyChesco - Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!
Smart 911 - Smart 911 is a new service in Chester County that allows you to create a Safety Profile at www.smart91 l .com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members' allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search start faster.
F:\Data\Shared Data\Agendas\Board of Supervisors\2020\2020-04-2 I _Board of Supervisors Agenda with time.doc
AGENDA Page -2- April 21, 2020
Memo
To: Board of Supervisors From: Jon Altshul Re: March 2020 Financial Report Date: April 8, 2020
As of March 31", the general fund had revenues of $3,683,977 and expenses of $2,547,964 for a year-to date surplus of $1,136,013 and a negative budget variance of $27,635. As of March 31", the general fund balance is $6,269,251. Please note that because of the March 31" real estate tax discount window,
March 31 is the high water mark for the General Fund's cash flow.
On the expense side, Public Works is well under budget (-$113,307) due to the lack of snow this winter, with those savings partially offset by the cost of the Forrest Lane bridge improvements and tree removal. Codes is also under-budget due to a strong start to permitting activity, prior to the shutdown.
Parks and Recreation is $32,386 over-budget due to Public Works personnel costs for work on Segments F&G of the Paoli Pike Trail and the timing of engineering invoices for the Bow Tree Pond project. Administration and Emergency Services are both modestly over budget.
On the revenue side, Earned Income Tax is more or less on target (-$4,276), while Real Estate Property Tax (-$56, 712 or -3.1%) and Real Estate Transfer Tax (-$59,079 or -40. 7%) are underperforming. Real
Estate Property Tax underperformed presumably due to residents' preoccupation with the current crisis; Real Estate Transfer Tax, which at this point only reflect transactions through the end of February, underperformed because of slow wintertime sales, and not the current crisis.
Other funds
• The State Liquid Fuels Fund had $551,589 in revenues and $0 in expenses. The fund balance was 552,737. • The Capital Reserve Fund had $89,749 in revenues and $393,465 in expenses. The fund balance was $5,106,818. • The Transportation Fund had $1,472 in revenues and $305,342 in expenses. The fund balance was $607,854. • The Sewer Operating Fund had $880,417 in revenues and $687,311 in expenses. The fund balance was $1,169,540. • The Refuse Fund had $260,248 in revenues and $268,796 in expenses. The fund balance was $620,646. • The Bond Fund had $14,928 in revenues and $118,518 in expenses. The fund balance was $3,612,050. • The Sewer Capital Reserve Fund had $3,245 in revenues and $50,551 in expenses. The fund balance is $2,290,482. • The Operating Reserve Fund had $9,308 in revenues and no expenses. The fund balance is $2,605,431.
Accounts Receivable
Utility accounts receivables were $157,147, which is a record low. I suspect this decrease is due to the success of the new Paymentus platform. However, I would expect this figure to drift upwards due to the current crisis.
2020 Real Estate Tax receivables were about $60,000 above where they were at this point last year, presumably due to the current crisis, but still approximately where there were as recently as 2014.
Yield on Township Funds The yield on Township funds has drifted down to 1.42%, compared to 1.71% at the end of 2019, due to the Federal Reserve's recent rate cutting actions. The average time until maturity of illiquid funds was 84 days, which has also fallen substantially, as the rates on CDs and other illiquid municipal products are no long competitive with liquid accounts. Accordingly, I am not rolling maturing investments into new CDs or other illiquid investments for the time being.
Thoughts on the Impact of the Shutdown on Township Finances There is no question that the Coronavirus situation will impact Township revenues, although the extent of the shutdowns and economic slowdown will not be known for several months. Specifically:
• Earned Income Tax, which represents about 50% of our revenues, will undoubtedly be impacted, although the full impact will not be known until November, when we receive Q3 remittances.
0
0
0
0
0
0
Historically, May remittances are 30%-40% higher than February, August and November remittances due to the revenue bump caused by the April 15th filing deadline. The later July 15th filing deadline will mean that our May (Q1) remittances will appear
much lower than normal, but this dip will be offset by our August (Q2) remittances, which will be anomalously high.
Regardless, business payrolls for Q1 were materially finished before any large scale layoffs may have started.
1099 workers and workers primarily compensated by tips (waiters, hairdressers, etc) will be disproportionately impacted by the downturn, but it is unknown how much tipped income is subject to EIT in the first place.
Larger companies laying off employees may be more likely to provide significant severance packages, which may cause increases in EIT receipts in the short-term.
So, the bottom line is that it will be hard to make sense of any Ell trends for some time.
• Real Estate Transfer Tax is likely to be substantially impacted in the short-term, as Real Estate agents can't legally show houses, and buyers and sellers can't close on contracts signed after mid-March. In other words, the spring real estate market will simply not exist this year. While pent up demand may result in a very busy fall real estate season, the impact on our 2020 receipts will be significant. • Other vulnerable income streams include interest income and building permits.
Date for Long-Range Budget Planning Session With all that said, the annual long-range planning session is going to be much more critical this year than in normal years. I would suggest that we aim for Wednesday, June 10 at 10am for this meeting. Please advise if there are any specific issues or items that you would like to discuss at this meeting.
EMERGENCY SERVICES EXPENSES PUBLIC WORKS EXPENSES ADMINISTRATION EXPENSES CODES EXPENSES PARK AND RECREATION EXPENSES TOTAL CORE FUNCTION EXPENSES
EMERGENCY SERVICES REVENUES PUBLIC WORKS REVENUES ADMINISTRATION REVENUES CODES REVENUES PARK AND RECREATION REVENUES TOTAL CORE FUNCTION REVENUES
NET EMERGENCY SERVICES NET PUBLIC WORKS NET ADMINISTRATION NET CODES NET PARK AND RECREATION I co RE FUNCTION NET SUBTOTAL
DEBT - PRINCIPAL DEBT- INTEREST I TOTAL DEBT
NON-CORE FUNCTION REVENUE
EARNED INCOME TAX REAL ESTATE PROPERTY TAX REAL ESTATE TRANSFER TAX CABLE TELEVIS.FRANCHISE
LOCAL SERVICES TAX OTHER INCOME
I TOTAL NON CORE FUNCTION REVENUE
EAST GOSHEN TOWNSHIP GENERAL FUND SUMMARY
As of March 31, 2020
4,379,933 1,162,512 2,774,562 578,728 1,886,456 543,218 522,011 129,568 881,005 129,687 10,443,967 2,543,713
72,000 7,375 1,000,284 127,297 318,829 44,471 272,870 44,043 132,620 24,651 1,796,603 247,837
4,307,933 1,155,137 1,774,278 451,431 1,567,627 498,747 249,141 85,525 748,385 105,036 8,647,364 2,295,876
349,999 203,872 15,590 553,871 15,590
5,130,800 1,244,996 2,042,779 1,859,287 650,000 145,000 457,200 114,300 345,000 84,931 575,456 26,598
9,201,235 3,475,112
1,169,674 7,162 506,431 (72,297) 576,630 33,412 110,040 (19,528) 169,439 39,752 2,532,213 (11,500)
5,816 (1,559) 168,307 41,010 71,129 26,658 56,901 12,858 30,622 5,971 332,775 84,938
1,163,857 8,720 338,124 (113,307) 505,501 6,754 53,139 (32,386) 138,816 33,780 2,199,438 {96,438)
0 15,753 163 15,753 163
1,240,720 (4,276) 1,802,575 (56,712) 85,921 (59,079) 109,274 (5,027) 88,081 3,150 24,631 (1,967)
3,351,201 (123,911)
• I • •. • • = •
0.6% -12.5%
6.2% -15.1%
30.7% -0.5%
-21.1%
32.2% 59.9% 29.2% 24.2% 34.3%
0.8% -25.1%
1.4% -37.9%
32.2% -4.2%
0.0% 1.0% 1.0%1
-0.3% -3.1% -40.7%
-4.4%
3.7% -7.4%
-3.6%1
SUMMARY OF FUNDS REPORT {AKA "JOE REPORT")
ALL FUNDS MARCH 2020 * NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
RECEJP' 310 320 330 340 350 360 380 390
01/01/20 BEGINNING BALANCE
rs TAXES LICENSES & PERMITS FINES & FORFEITS INTERESTS & RENTS INTERGOVERNMENTAL CHARGES FOR SERVICES MISCELLANEOUS REVENUES OTHER FINANCING SOURCES
EXPEN 400 410 420 426 430 450 460 470 480 490
DITURES
GENERAL GOVERNMENT PUBLIC SAFETY HEAL TH & WELFARE SANITATION & REFUSE HJGHWAYS,ROADS & STREETS CULTURE-RECREATION CONSERVATION & DEVELOPMENT DEBT SERVICE MISCELLANEOUS EXPENDITURES OTHER FINANCING USES
2020 SURPLUS/(DEFICIT)*
CLEARING ACCOUNT ADJUSTMENTS
03/31/20 ENDING BALANCE
GENERAL
FUND*
$5,625,871
$3,223,398
$110,060
$14,016 $46,747
$600 $92,162 $49,122 $167,311
$3,703,415
$378,213 $1,675,307
$40,751
$0 $399,008 $145,932
$329 $16,242 $412,189
$0
$3,067,970
$635,444
$7,935
$6,269,251
U:ICBoylan\Joe Report for Jon\202()..()3 All Funds Summary revised 4-tl-20.xfsx
LIQUID FUELS
STATE FUND
$1,148
$0 $0 $0 $94 $551,495
$0 $0 $0
$551,589
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0
$551,589
$552,737
CAP RESV TRANSPORT. SEWER OP. REFUSE FUND FUND FUND FUND
$5,410,535 $911,724 $976,435 $629,194
$0 $0 $0 $0 $0
$0
$0 $0 $0 $0 $0 $0 $11,381 $1,472 $2,772 $1,389 $78,368 $0 $0 $0 $0 $0 $876,960 $258,859 $0 $0 $685 $0
$0
$0 $0
$0
$89,749 $1,472 $880,417 $260,248
$63,658 $0 $0 $0 $6,955 $0 $0 $0 $0 $0 $0 $0 $0 $0 $609,728 $268,796 $277,738 $305,342 $0 $0 $0 $0 $0 $0 $45,114 $0 $0 so $0 $0 $76,132 $0 $0 $0
$0
$0 $0 $0 $1,451 $0
$393,465 $305,342 $687,311 $268,796
($303,716) ($303,870) $193,105 ($8,548)
$ɾ $ɿ $ʀ $ʁ
Page1of1
SEWER CAP OPERATING TOWNSHIP MUNICIPAL BOND RESVFUND RESERVE FUNDS AUTHORITY FUND
$2,337,788 $2,596,124 $18,488,820 $24,873 $3,715,640
$0 $0 $3,223,398 $0 $0 $0 $0 $110,060 $0 $0 $0 $0 $14,016 $0 $0 $3,245 $9,308 $76,406 ($43) $14,928 $0 $0 $630,463 $3,231 $0 $0 $0 $1,227,980 $846 $0 $0 $0 $49,807 $423 $0 $0 $0 $167,311 $52,002 $0
$3,245 $9,308 $5,499,440 $56,459 $14,928
$0 $0 $441,871 $0 $0 $0 $0 $1,682,261 $0 $0 $0 $0 $40,751 $0 $0 $0 $0 $878,524 $75,979 $0 $0 $0 $982,088 $0 $0 $0 $0 $145,932 $0 $118,518 $0 $0 $45,443 $0 $0 $0
$0 $92,373 $0 $0
$0
$0 $412,189 so $0 $50,551 $0 $52,002 $0 $0
$50,551 $0 $4,773,435 $75,979 $118,518
($47,306) $9,308 $726,005 ($19,520) ($103,590)
$2,290,482 $ $19,222,760 I
$ʂ $3,612,050
4/S/2020
1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, APRIL 14, 2020 5 DRAFT MINUTES 6 7 Note: In light of the Coronavirus pandemic, this was a virtual video-conference meeting 8 conducted via the Zoom platform. In response to media reports about the vulnerability of the 9 Zoom platform, public participation was limited to telephone. 10 11 Present: Chairman Marty Shane; Vice-Chairman David Shuey; Members Michele 12 Truitt, John Hertzog and Mike Lynch; Township Manager Rick Smith; Assistant 13 Township Manager and Finance Director Jon Altshul; Public Works Director Mark 14 Miller; Parks and Recreation Director Jason Lang; Leo Sinclair (Conservancy Board); 15 Tom Kilburn (Futurists Committee and Sustainability Advisory Committee); Police 16 Chief Brenda Bernot 17 18 Call to Order & Pledge of Allegiance 19 Marty called the meeting to order at 7:00 p.m. and led the pledge of allegiance. David 20 also called for a moment of silence in honor of our troops, public health workers and 21 first responders. 22 23 Chairman's Report 24 Marty reported that the Board met in Executive Session on March 5, 2020 for a 25 police labor matter; that the Board met with staff via teleconference and video 26 conference on March 16, 23 and 30 and April 6 and 9 as a result of the Emergency 27 Declaration and to provide status updates on essential operations; and that Karen 28 Miller has resigned from the Pipeline Task Force. Rick reported that the trash hauler 29 is no longer picking up yard waste or bulk trash and that recyclables need to fit in 30 the bin. 31 32 Emergency Services Report 33 Marty reported that the Goshen Fire and Good Fellowship Ambulance Company 34 reports are available on the Township website. 35 36 Approval of Minutes of March 3. 2020 37 David made a motion to approve the minutes of March 3, 2020. Michele seconded. 38 The motion passed 5-0. 39 40 Approval of Treasurer's Reports of March 12 and April 8, 2020 41 David made a motion to accept the receipts and approve the expenditures as presented in
42 the Expenditure Register and as summarized in the March 12 and April 8, 2020, Treasurer's 43 Reports. Michele seconded. The motion passed 5-0. 44 45 Consider Resolution to Ratify Actions Taken During the State of Emergency
4/14/20 April 14, 2020 1
1 David made a motion to adopt Resolution 2020-191 to ratify actions taken during the State 2 of Emergency as declared by the Township, to extend such State of Emergency if needed, 3 and to adopt procedures and policies for conducting public meetings during such State of 4 Emergency. Michele seconded. The motion passed 5-0. 5 6 Consider Replacement of CAT Excavator 7 David made a motion to purchase a Caterpillar Mini Excavator from Foley Cat in the 8 amount of $63,500, net of trade in of the existing Caterpillar Mini Excavator. Michele 9 seconded. John and Michele raised concerns about the cost of the excavator. Mark 10 explained that the excavator is used for every day operations and that the existing excavator 11 is 15 years old and would need substantial repairs to continue to work. Mr. Sinclair stated 12 that in light of the current economic crisis that the Township should not make any further 13 purchases. The motion passed 5-0. 14 15 Consider Replacement of Mowers 16 David made a motion to purchase two ExMark mowers from Conway Power Equipment 17 in the amount of $16,144, net of trade-in of the existing mowers. Michele seconded and 18 indicated her support of making the purchases from a local business. Mr. Sinclair raised 19 concerns about the Township spending money during the current economic crisis. Marty 20 noted that the Township still needs to mow grass. Russ Frank asked if these mowers would 21 be used to mow the Marydel! pond, to which Mark responded that the larger trailer mower 22 is used at that location. The motion passed 5-0. 23 24 Consider Stormwater Operation and Maintenance Agreement for 1540 Glenmont 25 Lane, 1620 Williams Way and 1424 Highgate Road 26 David made a motion to authorize the Chairman to execute the Stormwater Operation and 27 Maintenance Agreement for 1540 Glenmont Lane, 1620 Williams Way and 1424 Highgate 28 Road. Michele seconded. The motion passed 5-0. 29 30 Consider Grant Extension for Paoli Pike Trail Segments F&G 31 Jon explained that the $150,000 Chester County grant for Segments F&G through 3 2 Applebrook Park expires on April 21 and that we need an extension. David made a motion 33 to approve the Chester County Municipal Grant Program contract amendment, extending 34 the Chester County Municipal Grant contract termination date to April 21, 2021. Michele 35 seconded. The motion passed 5-0. 36 3 7 Consider Sanitary Manhole Adjustment for Segment A of the Paoli Pike Trail 3 8 Mark explained that Public Works needed to raise a manhole by 2. 7 feet for Segment A of 39 the Paoli Pike Trail and that PennDOT required an agreement for this work. David made a 40 motion to authorize the Chairman to sign the project agreement for the manhole adjustment 41 along Paoli Pike. Michele seconded. Mike noted that the Municipal Authority had also 42 approved this agreement last night. Mr. Sinclair asked how much the work would cost, to 43 which Mark estimated that it would be about $1,600. The motion passed 5-0. 44 45 Consider Resolution 2020-192 Establishing Sewer Rates for the 2nd Quarter of2020
4/14/20 April 14, 2020 2
1 Jon explained that due to the cun-ent crisis, he was recommending that residential sewer 2 bills be maintained at the existing levels for one more quarter. David made a motion to 3 approve Resolution 2020-192 continuing 2019-2020 sewer rates for the second quarter of 4 2020. Michele seconded. Marty stated that no decisions have been made about Quarter 3 5 sewer bills yet. Mr. Sinclair observed that residents are using the sewer system more during 6 the shutdown as they are spending more time at home. Jon observed that those residential 7 increases are offset by lower commercial consumption. He added that when rates do change 8 they will still reflect water consumption between Quarter 4 2019 and Quarter I 2020. The 9 motion passed 5-0. 10 11 Consider Bid Results for Cleaning and Televising Sanitary Sewer Lines 12 F b'd . d ti 1 . d 1 . . . I' our 1 s were receive ore eanmg an te ev1smg sanitary sewer mes: Vendor Price Pipe Data View $18,800 Trinity Subsurface Engineering $28,750 Mobile Dredging & Video Pipe $84,086.40 North America Pipeline Services $86,350 13 14 David made a motion to award the contract for cleaning and televising sanitary sewer lines 15 to Pipe Data View. Michele seconded. Mr. Sinclair asked if this cost was budgeted, to 16 which Jon and Mark responded that it is. The motion passed 5-0. 17 18 Any Other Matter 19 Given the current uncertainty about when the Township will reopen for regular business, 20 Jon recommended that the Township not put out a paper newsletter for the summer. 21 Instead, he suggested that a shorter newsletter be designed in-house and be sent out 2 2 electronically, which would save about $2,800 in postage. David made a motion to publish 23 an electronic summer newsletter in-house. Michele seconded. Mr. Frank suggested that the 24 Township just mail the newsletter to all residents itself. Jon noted that the newsletter goes 25 to 8,500 addresses, meaning that the cost would be far greater than $2,800. Mr. Sinclair 26 offered to disseminate the Township's e-newsletter through his publishing company. The 27 motion passed 5-0. 28 29 Public Comment 30 Mr. Frank asked for clarification about the purpose of the Township's Emergency 31 Declaration. Mr. Kilburn thanked the Board and Township staff for their hard work during 32 the cun-ent crisis. 33 34 Adjournment 35 There being no further business, David made a motion to adjourn at 9:00. Mike 36 seconded. The motion passed 5-0. 37 38 Respectfully submitted, 39 Jon Altshul, Recording Secretary 40 41 Attached: March 12, 2020 &April 8, 2020 Treasurer's Report 42 4/14/20 April 14, 2020 3
TREASURER'S REPORT February 27, 2020 -March 12, 2020 RECEIPTS AND BILLS
!GENERAL FUND
Real Estate Tax $627,109.37 Accounts Payable $568,932.56 Earned Income Tax $219,239.30 Electronic Pmts: Local Service Tax $8,683.21 Credit Card $0.00 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $5,385.53 Debt Service $0.00 Total Other Revenue $32,720.79 Payroll $128,409.63
Total General Fund Receipts: $893,138.20 Total Expenditures: $697,342.19
!STATE LIQUID FUELS FUND
Receipts $551,495.49 Accounts Payable $0.00 Interest Earned $1.54 Total State Liqud Fuels Receipts: $551,497.03 Total Expenditures: $0.00
!CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $29,070.86 Interest Earned $3,825.04 Total Capital Reserve Fund Receipts: $3,825.04 Total Expenditures: $29,070.86
!TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $377.43 Total Transportation Fund Receipts: $377.43 Total Expenditures: $0.00
!SEWER OPERATING FUND
Receipts $119,053.88 Accounts Payable $24,964.64 Interest Earned $982.59 Electronic Pmts:
Credit Card $0.00 Debt Service $0.00 Total Sewer Operating Fund Receipts: $120,036.47 Total Expenditures: $24 964.64
!REFUSE FUND
Receipts $47,159.69 Accounts Payable $62,560.92 Interest Earned $499.90 Total Refuse Fund Receipts: $47,659.59 Total Expenditures: $62,560.92
IBONDFUND
Receipts $0.00 Accounts Payable $6,149.66 Interest Earned $4,538.80 Total Bond Fund Receipts: $4,538.80 Total Expenditures: $6,149.66
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $1,100.12 Total Sewer Capital Reserve Fund Receipts: $1 100.12 Total Expenditures: $0.00
!OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $874.75 1 Total Operating Reserve Fund Receipts: $874.75 Total Expenditures: $0.00 2
4/14/20 April 14, 2020 4
TREASURER'S REPORT March 13, 2020 • April 8, 2020 RECEIPTS AND BILLS
!GENERAL FUND
Real Estate Tax $724,240.82 Accounts Payable $513,817.04 Earned Income Tax $71,715.87 Electronic Pmts: Local Service Tax $1,740.16 Credit Card $5,607.24 Transfer Tax $59,121.69 Postage $0.00 General Fund Interest Earned $5,123.23 Debt Service $5,413.95 Total Other Revenue $632,004.95 Payroll $188,548.78
Total General Fund Receipts: $1,493,946.72 Total Expenditures: $713,387.01
jSTATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $90.41 Total State Liqud Fuels Receipts: $90.41 Total Expenditures: $0.00
jCAPITAL RESERVE FUND
Receipts $187.46 Accounts Payable $61,063.45 Interest Earned $3,270.61 Total Capital Reserve Fund Receipts: $3,458.07 Total Expenditures: $61,063.45
jTRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $264.87 Total Transportation Fund Receipts: $264.87 Total Expenditures: $0.00
jSEWER OPERATING FUND
Receipts $49,220.75 Accounts Payable $186,152.74 Interest Earned $826.70 Electronic Pmts:
Credit Card $0.00 Debt Service $25,377.21 Total Sewer Operating Fund Receipts: $50,047.45 Total Expenditures: $211,529.95
I REFUSE FUND
Receipts $17,471.32 Accounts Payable $94,092.31 Interest Earned $488.25 Total Refuse Fund Receipts: $17,959.57 Total Expenditures: $94,092.31
jBONDFUND
Receipts $0.00 Accounts Payable $5,090.66 Interest Earned $3,734.50 Total Bond Fund Receipts: $3,734.50 Total Expenditures: $5,090.66
jSEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $928.16 Total Sewer Capital Reserve Fund Receipts: $928.16 Total Expenditures: $0.00
jOPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $725.55 1 Total Operating Reserve Fund Receipts: $725.55 Total Expenditures: $0.00
4/14/20 April 14, 2020 5
TREASURER'S REPORT April 8, 2020 - April 16, 2020
RECEIPTS AND BILLS
I GENERAL FUND
Real Estate Tax $8,467.31 Accounts Payable $69,634.31 Earned Income Tax $10,700.00 Electronic Pmts: Local Service Tax $5,700.00 Credit Card $0.00 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $0.00 Debt Service $0.00 Total Other Revenue $91,636.56 Payroll $132,688.31
Total General Fund Receipts: $116,503.87 Total Expenditures: $202,322.62
jSTATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned -$552.20 Total State Liqud Fuels Receipts: -$552.20 Total Expenditures: $0.00
jCAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $703.94 Interest Earned $0.00 Total Capital Reserve Fund Receipts: $0.00 Total Expenditures: $703.94
jTRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $91.57 Total Transportation Fund Receipts: $91.57 Total Expenditures: $0.00
jSEWER OPERATING FUND
Receipts $3,737.92 Accounts Payable $32,179.45 Interest Earned $0.00 Electronic Pmts:
Credit Card $0.00 Debt Service $0.00 Total Sewer Operating Fund Receipts: $3,737.92 Total Expenditures: $32,179.45
jREFUSE FUND
Receipts $2,054.49 Accounts Payable $968.67 Interest Earned $0.00 Total Refuse Fund Receipts: $2,054.49 Total Expenditures: $968.67
IBOND FUND
Receipts $0.00 Accounts Payable $673.50 Interest Earned $0.00 Total Bond Fund Receipts: $0.00 Total Expenditures: $673.50
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Sewer Capital Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
jOPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Operating Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
TO:
FROM:
SUB,IBCT:
nATE:
EAST GOSHEN TOWNSHIP
MEMORANnUM
BOARD OF SUPERVISORS
JON ALTSHUL
PROPOSE!) PAYMENTS OF BILLS
APRIL 16, 2020
Attached please find the Treasurer's Report for the weeks of April 8, 2020 - April 16, 2020.
Recommended motion: Mr. Chairman, I move that we graciously accept the receipts and approve the expenditures as presented in the Expenditure Register and as summarized in the Treasurer's Report.
F:\Dala\Shared Data\Finance Dept\Treasurers' Reports \2020\April 2020\04-16-20 Memo.docx
East Goshen Township Fund Accounting
Report Date 04/14/20 Expenditures Register GL-2004-73328
BATCH 1 OF2
PAGE 1
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
05 SEWER OPERATING
1393 US POSTMASTER 61726 1 05429 3250 /\DMIN.- POSTAGE QTR.2 2020 UTILILTY BILL MAILING
041420 04/14/20 04/14/20 04/14/20 4164 968.67 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
06 REFUSE
1393 US POSTMASTER 61726 2 06427 3250 POSTAGE 041420 QTR.2 2020 UTILILTY BILL MAILING
968.67
04/14/20 04/14/20 04/14/20 704 968.67
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
968.67
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
FUND SUMMARY
Fund Bank Account Amount Description ------- ------------ -------------- -----------------------------------
05 05 06 06 968.67 SEWER OPERATING 968,67 REFUSE
1,937.34
PERIOD SUMMARY
Period Amount
2004 1,937.34
1,937.34
Legend: Expenditures Register Spooling to Windows Printers Print those ready to UPDATE
Sorting by vendor Printing for GL Period 2004 Archiving to Expenditures Register-2004.txt MARP05 run by BARBARA 11 : 40 AM
2 Printed, totaling 1,937.34 1,937.34
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20F2
PAGE 1
Vendor Req ff Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# /\mount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
4217 AQUA PA 61735 1 01411 3630 HYDRANT & WATER SERVICE 040120 279 04/16/20 04/16/20 4,809.96 000310033 010033 2/28-3/31/20 186 61735 2 01411 3631 HYDRANTS - RECHARGE EXPENSE 040120 279 04/16/20 04/16/20 2,404.98 000310033 010033 2/28-3/31/20 93 61736 l 01411 3630 HYDRANT & WATER SERVICE 040120 HY6 04/16/20 04/16/20 155 .16 000309987 0309987 2/28-3/31/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
7,370.10
113 BARTLETT TREE EXPERTS 61737 l 01438 2460 TREE REMOVAL 386468665-0 04/16/20 04/16/20 1,896.00 TREE TRIMMING & REMOVAL· THISTLE LANE 2/27/20 61738 1 01438 2460 TREE REMOVAL 38648666-0 04/16/20 04/16/20 1,560.00 TREE TRIMMING & REMOVAL· LINDEN LANE 2/27/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2695 BRICKHOUSE ENVIRONMENTAL 61741 l 01454 3000 GENERAL EXPENSE MARCH 2020 EGT PARK WATER SAMPLING
3036
3,456.00
04/16/20 04/16/20 633.82 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
633. 82
197 BUCKLEY BRION MCGUIRE & MORRIS 61743 1 01404 3140 LEGAL· ADMIN 22066 04/16/20 04/16/20 644.00 LEGAL SERVICE 3/4/20 - 3/25/20 61743 2 01413 3140 LEGAL· TWP CODE 22066 04/16/20 04/16/20 86.50 LEGAL SERVICE 3/4/20 · 3/25/20 61743 3 01414 3110 LEGAL· CODES 22066 04/16/20 04/16/20 28.50 LEGAL SERVICE 3/4/20 · 3/25/20 61743 4 01414 3141 LEGAL· ZONING HEARING BOARD 22066 04/16/20 04/16/20 116.00 LEGAL SERVICE 3/4/20 · 3/25/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
875,00
3488 CINTAS CORPORATION #287 61744 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 4046888084 04/16/20 04/16/20 70.92 WEEK END 4/1/20 CLEAN MATS 61744 2 01487 1910 UNIFORMS 4046888084 04/16/20 04/16/20 547.56 WEEK END 4/1/20 CLEAN UNIFORMS 61745 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 4047582711 04/16/20 04/16/20 70.92 WEEK END 4/8/20 CLEAN MATS 61745 2 01487 1910 UNIFORMS 4047582711 04/16/20 04/16/20 547,56 WEEK END 4/8/20 CLEAN UNIFORMS 61746 1 01409 3740 TWP, BLDG. · MAINT & REPAIRS 4046307537 04/16/20 04/16/20 70.92 WEEK END 3/25/20 CLEAN MATS
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20 F 2
PAGE 2
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
3488 CINTAS CORPORATION #287 61746 2 01487 1910 UNIFORMS WEEK END 3/25/20 CLEAN UNIFORMS
4046307537 04/16/20 04/16/20 547.56 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2043 CLEAN-FLO INTERNATIONAL 61747 1 01454 3725 SATELITE PARK IMPROVEMENT (PONDS) 10473A ANNUAL MAINTENNCE 4/20/20 - 3/21/21
PIN OAK & BOW TREE PONDS
04/16/20
1,855.44
04/16/20 620 .00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3249 COMCAST 8499-10-109-0107712 61749 1 01401 3210 COMMUNICATION EXPENSE 0107712 4/5-5/4/20 EG PARK LED 040420
620. 00
04/16/20 04/16/20 118 .35 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3490 COMCAST 8499·10-109-0111284 61748 1 01401 3210 COMMUNICATION EXPENSE 040420 0111284 4/9-5/8/20 SPEC.VIDEO PW
118.35
04/16/20 04/16/20 44. 77 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
320 CONWAY POWER EQUIPMENT 61750 1 01430 2330 VEHICLE MAINT AND REPAIR ARM REST PADS KIT, ANTI SCALP ROLLER & AXLE ROLLER
70601
44.77
04/16/20 04/16/20 327. 67
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3941 DISCOVERY BENEFITS INC. 61751 1 01487 1500 MISC. EMPLOYEE BENEFITS MARCH 2020 FSA
0001143977-IN 04/16/20
327.67
04/16/20 50.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3942 FERGUSON & MCCANN INC. 61752 1 01409 3745 PW BUILDING - MAINT REPAIRS NOZZLE FOR FUEL
46558 04/16/20
50.00
04/16/20 141.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
141.00
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20 F 2
PAGE 3
Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4136 FIRSTNET - #287290606505 61753 1 01401 3210 COMMUNICATION EXPENSE MARCH 2020
505X04082020 04/16/20 04/16/20 900.47 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4137 FIRSTNET - #287290608802 61754 1 01401 3210 COMMUNICATION EXPENSE MARCH 2020
802X04082020 04/16/20
900.47
04/16/20 614.73 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
569 GREAT VALLEY LOCKSHOP 61756 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS ADJUST.CLOSERS, DEAD BOLTS, KNOBS, THRESHOLD & INTSTALLATION SHOP DOOR
2020000917
614.73
04/16/20 04/16/20 2,939.74 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2717 HIGGINS & SONS INC., CHARLES A. 61757 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TURN OFF SCHOOL FLASHERS
51607 04/16/20 04/16/20
61758 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. 51590 04/16/20 04/16/20 TRAF. LIGHT REPAIR -RT. 352 & HIGHLND l t.lS v Cl z c { iis c. c, ._, m.r}
2,939.74
70.00
4,471.82 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
719 KEEN COMPRESSED GAS COMPANY 61759 1 01437 2460 GENERAL EXPENSE - SHOP VARIOUS CYLINDERS OF GASES
83270687
4,541.82
04/16/20 04/16/20 74.51 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
74.51
765 LEC - LENNI ELECTRIC CORPORATION 61760 1 01409 3745 PW BUILDING - MAINT REPAIRS 200357 04/16/20 04/16/20 289.50 TROUBLESHOOT TRIPPING OUTLET IN REPAIR SHOP & REPAIR 61761 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 200360 04/16/20 04/16/20 159.75 REPAIR COPIER BREAKER IN ADMIN BLDG ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
449.25
1641 NAPA AUTO PARTS 61763 1 01430 2330 VEHICLE MAINT AND REPAIR 2-808532 04/16/20 04/16/20 150.90 OIL FILTERS 61764 1 01430 2330 VEHICLE MAINT AND REPAIR 2-809425 04/16/20 04/16/20 242.36 BATTERIES 61765 1 01430 2330 VEHICLE MAINT AND REPAIR 2-808529 04/16/20 04/16/20 100.60 AIR & OIL FILTERS ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
493.86
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20F2
PAGE 4
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
3679 NETCARRIER TELECOM INC, 67846 61766 l 01401 3210 COMMUNICATION EXPENSE 4/1/20 - 4/30/20 644417 04/16/20 04/16/20 451,52 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3680 NETCARRIER TELECOM INC, 67891 61770 l 01401 3210 COMMUNICATION EXPENSE 4/1/20 - 4/30/20 644424
451.52
04/16/20 04/16/20 138.34 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
138.34
1032 PECO - 99193-01302 61774 l 01409 3600 TWP. BLDG, - FUEL, LIGHT, WATER 040720 04/16/20 04/16/20 73.60 99193-01302 2/26-3/26/20 61774 2 01409 3600 TWP, BLDG. - FUEL, LIGHT, WATER 040720 04/16/20 04/16/20 2,420.28 99193-01302 2/26-3/26/20 61774 3 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 040720 04/16/20 04/16/20 248.61 99193-01302 2/26-3/26/20 61774 4 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 040720 04/16/20 04/16/20 73. 78 99193-01302 2/26-3/26/20 61774 5 01454 3600 UTILITIES 040720 04/16/20 04/16/20 271, 52 99193-01302 2/26-3/26/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4091 PECO 02280-03067 61773 1 01454 3717 MARYDELL POND REHAB 040720 02280-03067 3/3-4/3/20 MARYDELL 04/16/20
3,087.79
04/16/20 52. 77 ------ --------- ------- ---- ----------------------------------- ----------------------- --------- --------- ------ ------------
1005 PENNSYLVANIA ONE CALL SYSTEM 61777 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS MONTHLY ACTIVITY - MARCH 2020
0000852967
52. 77
04/16/20 04/16/20 38.74 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2878 TD AMERITRADE FBO 913-022866 61779 1 01483 5315 PENSION - DC NON-UNIFORM APRIL 2020
041620 04/16/20
38.74
04/16/20 12,043.00
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
12,043.00
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20F2
PAGE 5
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3659 TD AMERITRADE FBO 913074154 61778 l 01483 5320 FF PENSION· EXPENSE APRIL 2020
041620 04/16/20 04/16/20 17,895.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
17,895.00
1410 WESTTOWN TOWNSHIP 61181 l 01410 5310 REGIONAL POLICE BLDG INTEREST 041620 04/16/20 04/16/20 831.29 APRIL 2020 - INTEREST 61781 2 01410 5320 REGIONAL POLICE BLDG PRINCIPAL 041620 04/16/20 04/16/20 9,583.33 APRIL 2020 - PRINCIPAL ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
10,420.62
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20 F2
PAGE 6
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# l\mount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
03 SINKING FUND
1052 PENNONI ASSOCIATES INC. 61776 1 03410 7400 POLICE BUILDING ROOF 1019727 SERVICE THRU 4/5/20 POLICE STATION ROOF
04/16/20 04/16/20 703.94 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
703.94
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20F2
PAGE 7
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
05 SEWER OPERATING
151 BLOSENSKI DISPOSAL CO, CHARLES 61739 1 05422 4502 R,C, SLUDGE-LAND CHESTER SWITCH 20 YDS W/LINER 3/30/20
177415 04/16/20 04/16/20 181. 00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2695 BRICKHOUSE ENVIRONMENTAL 61740 1 05422 3700 R,C, STP-MAINT,& REPAIRS MARCH 2020 · APPLBRK CC/GW MON,
3033
181. 00
04/16/20 04/16/20 1,082.62 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
569 GREAT VALLEY LOCKSHOP 61756 2 05422 3701 R,C, COLLEC.-MAINT,& REPR ADJUST, CLOSERS, DEAD BOLTS, KNOBS, THRESHOLD & INTSTALLATION HM PS
2020000917
1,082.62
04/16/20 04/16/20 2,939.74 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1624 L/B WATER SERVICE INC 61762 1 05420 3705 ASHBRIDGE-MAINT.&REPR FLG GATE VALVES, GASKETS & FLANGED ACCESSORY SET
3378161
2,939.74
04/16/20 04/16/20 1,616.86 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3675 NETCARRIER TELECOM INC, 67889 61769 1 05420 3602 C,C, COLLECTION ·UTILITIES 4/1/20 · 4/30/20 644422
1,616.86
04/16/20 04/16/20 50.17 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3676 NETCARRIER TELECOM INC. 67890 61771 1 05422 3600 R, C STP ·UTILITIES 4/1/20 • 4/30/20 644423
50.17
04/16/20 04/16/20 50.15 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3677 NETCARRIER TELECOM INC, 67887 61767 1 05420 3602 C,C, COLLECTION -UTILITIES 4/1/20 - 4/30/20 644420
50.15
04/16/20 04/16/20 50.28 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
50,28
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20F2
PAGE 8
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3678 NETCARRIER TELECOM INC, 67888 61768 l 05420 3603 ASHBRIDGE - UTILITIES 4/l/20 - 4/30/20 644421 04/16/20 04/16/20 50.26 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3725 NETCARRIER TELECOM INC, 68255 61772 l 05420 3604 MILL VAL./Bl>NJIAY UTILITIES 4/l/20 - 4/30/20 644580
50.26
04/16/20 04/16/20 51,42 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
51.42
1031 PECO - 99193-01204 61775 l 05420 3602 C.C. COLLECTION -UTILITIES 040720 04/16/20 04/16/20 382.82 99193-01204 2/26-3/31/20 61775 2 05420 3604 MILL VAL./Bl>NJIAY UTILITIES 040720 04/16/20 04/16/20 301. 81 99193-01204 2/26-3/31/20 61775 3 05420 3600 C.C. METERS - UTILITIES 040720 04/16/20 04/16/20 10.26 99193-01204 2/26-3/31/20 61775 4 05422 3601 R.C. COLLEC.-UTILITIES 040720 04/16/20 04/16/20 265.40 99193-01204 2/26-3/31/20 61775 5 05422 3600 R.C STP -UTILITIES 040720 04/16/20 04/16/20 9,600.77 99193-01204 2/26-3/31/20 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1005 PENNSYLVANIA ONE CALL SYSTEM 61777 2 05420 3701 C.C. INTERCEPT,-MAINT.&REP MONTHLY ACTIVITY - MARCH 2020 61777 3 05420 3702 C.C, COLLEC.-MAINT.& REPR. MONTHLY ACTIVITY - MARCH 2020
0000852967
0000852967
04/16/20
04/16/20
04/16/20
04/16/20
10,561.06
38. 73
38. 73 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2914 TOWLER, SCOTT A. 61780 l 05422 4500 R.C. STP-CONTRACTED SERV. SERVICE RE: RCSTP - MARCH 2020
77 .46
20-03013120-l 04/16/20 04/16/20 14,499.76 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
14,499.76
East Goshen Township Fund Accounting
Report Date 04/16/20 Expenditures Register GL-2004-73359
BATCH 20F2
PAGE 9
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
08 BOND FUNDS (CAPITAL PROJECTS)
197 BUCKLEY BRION MCGUIRE & MORRIS 61742 l 08459 6000 MISC TRAIL EXPENSES LEGAL SERV,- MARCH 2020 PAOLI PK TR
22067 04/16/20 04/16/20 673.50 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
673.50
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
FUND SUMMARY
Fund Bank Account Amount Description ------- ------------ -------------- -----------------------------------
01 01 03 03 05 05 08 08
69,634.31 GENERAL FUND 703, 94 SINKING FUND 31,210, 78 SEWER OPERATING 673.50 BOND FUNDS (CAPITAL PROJECTS)
102,222.53
PERIOD SUMMARY
Period Amount
2004 102,222.53
102,222.53
Legend: Expenditures Register Spooling to Windows Printers Print those ready to pay Sorting by vendor Printing for GL Period 2004 Doing a page break
Creating a CSV File Archiving to Expenditures Register-2004.txt MARP05 run by BARBARA 12: 26 PM
102,222.53 0 Printed, totaling 102,222.53
April 16, 2020
To: Board of Supervisors
From: Mark Miller
Re: Replacement of Stair Treads
As requested by the Board I attempted to get additional quotes for the replacement of the stair treads. I reached out to 2 other companies and received one response.
Bob Wagner Mac Flooring Front Stairs $3,180.34 $3,000.00 Rear Stairs $5,257.03 $5,575.00 Public Works Stairs $3,526.28 $3,400.00 Total $11,963.65 $11,975.00
Unfortunately, the cost to replace the treads in all three stair towers, is over the limit ($11,300).
Accordingly, I would suggest that we only replace the treads in the front and rear stairs now.
Bob Wagner Mac Flooring Front Stairs $3,180.34 $3,000.00 Rear Stairs $5,257.03 $5,575.00 Total $8,437.37 $8,575.00
Recommended motion: Mr. Chairman, I move that we accept the proposal from Bob Wagner replace the stair treads in the front and rear stair towers at a cost of $8,437.37.
F:\Data\Shared Data\Public Works Dept\Buildings\Twp. Bldg. 1580 Paoli Pike\Stair Towers\Stair Treads 041620.docx
Memo
To: Board of Supervisors From: Park and Recreation Commission
Community Day; Reschedule April 17, 2020 Re: Date:
Overview: Community Day is currently scheduled for Saturday, June 27th with a rain date of Sunday, June 28th. Due to coronavirus and stay at home considerations, it is the Park and Recreation Commission's recommendation that Community Day be moved to August 29th in conjunction with the Food Truck and Music Festival.
Why?
• The Friends of East Goshen (FOEG; 501c3) secures community donations to defray Township financial investment in Community Day. FOEG typically has a two-month lead-in time from first contact with potential donors to the event's production of donor "thank you" items such as the Community Day banner. • With regards to COVID-19, stay at home policies, and associated business, public spaces and employment impacts may still be in place for an undetermined amount of time. • Decision timeliness; in addition to FOEG's consideration above, Community Day involves many event partners, officials and community leaders who will need time to prepare post-decision
We want Community Day to be the event it is every year. A wonderful, community-wide celebration of
East Goshen Township, where residents and their families can embrace each other as one "Township wide neighborhood". Given the above practical factors, unknown public space access time lines, and frankly, national nervousness regarding COVID-19, it is our recommendation to move Community Day to coincide with the Food Truck and Music Festival on August 29,2020.
Points of note:
• All Community Day vendors (fireworks, moon bounce, pony rides etc.) and logistical partners (WEGO, Goshen Fire, Public Works, Applebrook Golf Club) have set aside August 29 and await our decision. • Rescheduling to coincide with the Food Truck Festival is recommended specifically because the logistical partners listed above were already scheduled. • Both event's activity profiles would remain the same. Alcohol sales and consumption would be limited to the Food Truck Festival side of the event (see attached map) and enforced by WEGO. Alcohol sales would still end at 7pm as previously approved. • We anticipate event attendance collectively to be 6,000 with a peak of 5,000 for the fireworks. This projection is based on Community Day's {3500) and Food Truck Fest (4500) past
attendance, accounting for same attendance overlapping.
Computer/H:/East Goshen Township/Budget
Additional considerations
• Since this is a one-time event, do we consider rebranding it as something new? For example, "Park-a-Palooza"? Benefits would be consolidated marketing efforts and an appeal to the size and scope of this one-time experience. The Park and Recreation Commission is considering options and taking suggestions. • For discussion down the road, where do we formal remarks and the singing of the National Anthem?
Future short-term consideration
• Given an uncertain future regarding coronavirus-related public space procedures, the Park and
Recreation Commission will reevaluate Community Day again on June 4, 2020 for a complete event cancellation and, if needed, make a recommendation to the BOS at its June 9th, 2020 meeting.
Motion: I move to reschedule the 2020 Community Day for August 29, 2020 with a rain date of August 30th, 2020.
Computer/H:/East Goshen Township/Budget
Memo
To: Board of Supervisors From: Jon Altshul Re: Consider Participation in SolSmart Date: April 16, 2020
SolSmart is a free United States Department of Energy (DoE) program that provides technical support to municipalities about solar energy. Cadmus, the consulting firm hired by the West Chester Area Council of Governments for the Renewable Energy Study, is a designated SolSmart contractor with DoE. Cadmus contacted me last week to gauge East Goshen's interest in signing up for SolSmart, which is scheduled to end in October of 2020 absent additional funding from Congress.
As a first step, Cadmus would review our ordinances, internal processes, municipal facilities, and the utility interconnections throughout the Township to determine whether we are a bronze, silver or gold certified community, and then outline various recommendations to improve the solar landscape in East Goshen for both municipal operations and residential and commercial installations alike.
According to Cadmus, the cost of solar installation in most U.S. municipalities is roughly double what it is in many European nations because of the confusing maze of ordinances and inefficient utility interconnections. By implementing the Township recommendations outlined in a SolSmart report, the cost of solar for our residents and businesses could fall substantially.
According to Cadmus, there is still time for it to conduct its review before the program funding expires in October.
Because the program is free, there is no downside risk to signing up for SolSmart, other than additional staff time. Note that SolSmart was not one of the 18 strategies analyzed in Cadmus's report.
I have attached a letter to for Rick's signature, if the Board is agreeable to signing up for the program.
Recommended motion: Mister Chairman, I authorize the Township Manager to sign and send the attached letter indicating East Goshen's interest in joining the SolSmart program.
610-692-7171 www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Friday, April 17, 2020
Scott Annis
International City/County Management Association 777 North Capitol St. NE, Ste. 500 Washington, DC 20002
Theresa Perry The Solar Foundation
1110 Vermont Avenue NW, Suite 930 Washington, DC 20005
Dear Scott Annis and Theresa Perry:
On behalf of East Goshen Township, I am proud to announce our commitment to become a SolSmart designated community. In partnership with the SolSmart team, East Gosh en's dedicated staff members will work to improve solar market conditions, making it faster, easier, and more affordable for our residents and businesses to install solar energy systems. These efforts will also increase the efficiency of local processes related to solar development, which may save our local government time and money.
Sol Smart builds upon our community's participation in the Sustainable Pennsylvania program, for which we were designated as a Gold-level community.
East Goshen will leverage SolSmart to achieve the following goals:
• Simplify and enhance the efficiency of the solar permitting and inspection process. • Evaluate opportunities to enhance our zoning ordinance in order to support property owners who seek to adopt solar energy systems. • Identify and provide information on resources and programs that can assist members of the community to support solar energy.
These efforts demonstrate that our community is committed to driving continual improvement in our solar market, and in the process of doing so, all the related areas identified as community priorities in our relevant plans or initiatives.
In order to measure progress along the way, East Goshen will track key metrics related to solar energy deployment, such as installed solar capacity the and number of installations across sectors.
Inquiries related to East Goshen's SolSmart participation can be directed to Jon Altshul, Assistant Township Manager, at ialtshul@eastgoshen.org or 610-692-7171.
Sincerely,
Louis F. Smith Township Manager
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/15/2020 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer Re: SWM O&M Agreements
Dear Board Members:
The Code Department has received the following Stormwater Management Operation and Maintenance agreements for authorization by the Board of Supervisors:
1. 1527 Meadowbrook Ln. 2. 37 Meadow Creek Ln.
Staff Recommendation:
Staff has reviewed these projects and the SWM O&M Agreements and recommends that the Board authorize the Chairman to sign the SWM agreements.
Draft Motion:
Mr. Chairman, I move that the Board authorize the Chairman to sign the storm water management operation and maintenance agreements for:
1. 1527 Meadowbrook Ln.
2.
37 Meadow Creek Ln.
F:\Data\Shared Data\Code Dept\Storm Water Managment O&M Agreements\2020\Memo to BOS 041S2020.doc
Memo
To: Board of Supervisors From: Jon Altshul Re: Consider Extending Discount Window for Property Tax Date: April 16, 2020
As of Thursday, April 16, SB 841 was awaiting the Governor's signature, having passed overwhelmingly in both chambers. Among its various provisions, the bill-if signed by the Governor-would allow taxing districts, including townships, to extend the discount window for real estate tax payments to no later than August 31st and 2) waive any fee or penalty associated with the late payment, if the tax is paid in full by December 31st•
The fiscal impact of implementing this policy in East Goshen would be about $10,000 in foregone revenue, including about $4,500 from foregone face value taxes and $5,500 from the foregone 10% late fee. Lost interest income would be minimal.
If the Governor signs SB 841 prior to our meeting on Tuesday, April 21, I would recommend that the Board adopt the attached Resolution.
Recommended motion: Mister Chairman, I move that we adopt the Resolution, extending the discount period for 2020 East Goshen Township Real Estate Taxes until August 31, 2020, and eliminating the 10% late penalty for East Goshen Township Real Estate Tax payments paid in full prior to December 31, 2020.
EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA
RESOLUTION 2020-
A RESOLUTION EXTENDING THE DISCOUNT PERIOD
FOR 2020 EAST GOSHEN TOWNSHIP REAL ESTATE
TAXES UNTIL AUGUST 31, 2020 AND ELIMINATING
THE 10% LATE PAYMENT PENAL TY FOR EAST GOSHEN TOWNSHIP REAL EST ATE TAX PAYMENTS
PAID IN FULL PRIOR TO DECEMBER 31, 2020
WHEREAS, the economic impact of the Coronavirus pandemic is incalculable;
WHEREAS, Pennsylvania Act __ , enacted on ____ , allows taxing districts, including townships, to extend the discount period for 2020 real estate tax payments through August 31st and to waive any fee or penalty associated with the late payment of 2020 real estate tax payments, if the tax is paid in full by December 31st;
WHEREAS, East Goshen Township would forego approximately $10,000 in real estate tax revenue, or less than 0.5% of its total budgeted real estate taxes, if this policy were enacted in East Goshen;
NOW THEREFORE, BE IT RESOLVED THAT the East Goshen Township Board of
Supervisors hereby directs the East Goshen Township Tax Collector to extend the discount period for 2020 real estate tax payments through August 31st and to waive any fee or penalty associated with the late payment of 2020 real estate tax payments, if the tax is paid in full by December 31 st•
RESOLVED AND ADOPTED, this __ day of _______ .2020.
ATTEST:
Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2020\Extending Real Estate Tax Dates.docx
C:\Users\sdamore\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\VQPRVMYI\Memo to BOS re. ROW APA's Seg. B 04172020.doc
Memorandum East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org Date: 4/17/2020 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer Re: Segment B, Appraisal Problem Analysis (APA’s) And appraisal review services Dear Board Members, As you know, McMahon Associates has been working on the trail design plans for Segment B of the Paoli Pike Trail (PPT). Segment B is the area between Airport Rd. and Ellis Ln Enterprise Drive. The easements we need to construct Segment B of the trail are ready for appraisal. We are going to follow the exact same appraisal process we have for the other segments. Our first step is to have an APA (Appraisal Problem Analysis) written for each parcel. This outlines the scope of the appraisal, which the appraiser will follow. Once the APA’s are ready, we will forward them to the appraiser. At that time, the appraiser will provide a proposal to perform the appropriate appraisals outlined in the APA’s. Once the appraisals are done ARS will review them in accordance with PennDOT requirements. Appraisal Review Specialists (ARS) has provided us with a proposal for the APA’s. ARS is an approved PennDOT vender and has performed all the APA’s and appraisal reviews for this project to date. ARS is very timely and thorough. There are 6 separate lots within Segment B however only 4 APA’s need to be performed because multiple adjacent lots are owned by the same owner. I confirmed this with ARS and their response was. “There are four “parcels” that will be impacted; since the multiple tracts of land owned by the referenced owners are adjacent to each other, under Section 705 of the Eminent Domain Code, these four tracts represent two “parcels” of land (one each). So the price is $800 x 4 = $3,200 for four APAs.” Draft Motion: Mr. Chairman, I move that the Board of Supervisors approve the proposal from Appraisal Review Specialists to prepare the APA’s and perform Appraisal Review services for the properties within Segment B of the Paoli Pike Trail for a cost not to exceed $2,200 per parcel.
Appraisal
Review §peclallsts
appraisalreviewspecialists. com
April 16, 2020
Mark A. Gordon, CFM Director of Code Enforcement / Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6199
Re: Paoli Pike Trail Segment B Cost Estimate
Dear Mr. Gordon:
Appraisal Review Specialists,LLc
3058 Mount Vernon Road Suite 12 Hurricane, WV 25526 appraisalreview@frontier.com
304.760.2156 office 304.760.2158 fax
Pursuant to your request, and based upon the preliminary information, Appraisal Review Specialists, LLC has developed the following "Not to Exceed" cost estimates:
• Prepare APAs at a cost of $800.00 per parcel; and subsequently perform Appraisal Review services on those project parcels at a cost of $1,400.00 each.
Our cost estimate has considered the overall complexity and projected scope of the assignment, and is based upon a cost that includes expenses, overhead and profit.
Fee Estimates provided reflect a cost for the initial preparation of documents and appraisal review. If plan revisions or changes occur subsequent to the completion and submission of the initial documents and appraisal review, the Client will be billed at an "all inclusive" hourly rate of$ I 05.00 per hour.
It is requested that any questions, comments, and/or correspondence be sent directly to Appraisal Review Specialists, LLC Managing Partner R. Scott Barber and all salient information will subsequently be forwarded to the Review Appraiser.
If you have any questions or concerns, please do not hesitate to contact me. We look forward to working with you.
Very truly yours,
L<. R. Scott Barber, Manager/Review Appraiser Pennsylvania Certified General Real Estate Appraiser #GA-001727-R
Specializing in the Review of Eminent Domain Real Estate Appraisal and Specialist Reports
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/17/2020 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer Re: Paoli Pike ROW Acceptance
Dear Board Members,
As you know, McMahon Associates has been working on the trail design plans for Segment B of the Paoli Pike Trail (PPT). Segment B is the area between Airport Rd. and
Ellis Ln.
Back in 1982 when the Goshen Corporate Park was approved the plan identified that all rights of way shall be offered to the Township for dedication.
We have determined that the Township never formally accepted the ROW identified along Paoli Pike. In order to accommodate the Paoli Pike Trail it is necessary for the Township to accept the ROW area at this time.
The Township solicitor has drafted a resolution for your consideration, which will accept the ROW area identified along Paoli Pike.
Draft Motion:
Mr. Chairman, I move that the Board of Supervisors accept the offer of dedication of areas of right-of-way and easements that were offered for dedication to the Township on the following approved and recorded subdivision and land development plan:
1) Plan of Subdivision of Goshen Corporate Park prepared by Henry S. Conrey, Inc. dated April 30, 1981, recorded in the Office of the
Recorder of Deeds of Chester County on November 16, 1982 as Plan No. 84193-1, which plan is attached hereto as Exhibit "A".
F:\Data\Shared Data\Paoli Pike Trail\Segment B\ROW\Memo to BOS re. ROW Corp. Park Seg. B 04172020.doc
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. ___ _
WHEREAS, the Township has developed a master plan for a multimodal trail (the "Trail") to be constructed along Paoli Pike and Boot Road from Airport Road to Line Road (the "Trail Project"); and
WHEREAS, portions of the Trail will be constructed within areas of right-of-way of Paoli Pike and areas of easements which were offered for dedication to the Township when various subdivision and land development plans were approved and recorded for various parcels of real property along Paoli Pike; and
WHEREAS, the Township desires to accept the offer of dedication of areas of right of-way and easements that were offered for dedication to the Township when various subdivision and land development plans were approved and recorded for various parcels of real property along Paoli Pike, which plans are described hereinbelow;
NOW THEREFORE, BE IT RESOLVED by the Board of Supervisors of East Goshen Township as follows:
The Township accepts the offer of dedication of areas of right-of-way and easements that were offered for dedication to the Township on the following approved and recorded subdivision and land development plan:
1) Plan of Subdivision of Goshen Corporate Park prepared by Henry S. Conrey, Inc. dated April 30, 1981, recorded in the Office of the
Recorder of Deeds of Chester County on November 16, 1982 as Plan No. B4193-1, which plan is attached hereto as Exhibit "A".
RESOLVED this ___ day of ______ , 2020.
ATTEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
E. Martin Shane, Chairman
David E. Shuey, Vice Chairman
Michael P. Lynch, Member
John F. Hertzog, Member
Michele D. Truitt, Member
2
1) THE LEGAL RIGHT-or-WAY WIDTH ON PAOLI PIKE SR 2014, roRMERLY ROUTE No. 143 rRoM STA. 104+23.46 TO STA. 128+94.65 IS 40 rEET BASED ON rINAL DRAWINGS roR CONSTRUCTION AND CONDEMNATIOII{ or RIGHT-or-WAY roR ROUTE 143 SECTioN 2, DATED OCTOBER 4, 1945
AND SIGNED BY THE GOVERNOR EDWARD MARTIN ON APRIL 25, 1946.
:<]t '{.'l '-':i. TOT AL AREA OF REQUIRED _
7561 TOTAL AREA OF ,ITMP'."'"CONSTR. EASEMENl;
2) TEMeORAR'f.C.ONSJRUC.IlON...EASEMEt,li'. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION or THE PROJECT. THE EASEMENT IS REQUIRED Oll{L Y UNTIL THE CONSTRUCTION OR \¥ORK INDICATED BY THE PLAN IS CĭPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY EAST GOSHEN TO\VNSHIP.
SF, 0.174 AC
ACERO HOLDINGS LLC
UPI ,53-4- 168
5427 sr. __QJ_;tJ;_ •y
3) NiFWii U-i§AFAX) .\II{ EASEMENT roR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND AL TERA TION or A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY O\VNER rRo\j MAKING ANY LEGAL USE or THE AREA \VHICH IS NOT DETRIMENTAL TO ITS USE roR SIDEWALK PURPOSES.
4) THE BEARING SYSTEM IS BASED ON THE PROJECT DATUM: PENNSYLVANIA STATE PLANE COORDINATE SYSTEM (NAD 83).
REQUIRED SIDEWALK EASEMENT LINE TABLE LINE BEARING DISTANCE L1 N31"36'15"W 7.29' L2 N69"03'44"E 147.40' L3 N5T00'31"E 140.09'
10' V,,DE SHARED USE PATH
LEGAL R/fr Lit£ {r,IP)
LEGAL R/fr Lit£
N
L4 N58"30'52"E L5 N68"22'45"E L6 N36"50'17"E
324.48' 100.00' 40.85" Į-14,!l;l v"ig t įN59'03'15"1:.::1;!' --:Jfr r 124 I ,20 -t"Ll.,I., l:.!11 OS . - . . . - ll< t I _u.. nr-1,... a __ f_t..,.. ts I I I T 4 z L7 S31"3r15"E 26.24' L8 S58"35'28"W 349.85' L9 S58"28 06 W 343.99 L10 S59"42"3TW 56.01
P7 / /71 REQUIRED SIDEWALK
İ
•
I
1
II SHARED USE PATH I
-EDGE OF PA VEVENT SR 2014 R/W & CoNSTR. i
... V// ..__./ .... // ...... /I _. EASEMENT SELECTIVE TREE I
I
REMOVAL
I L.__J -o- PATH PROTECTIVE RAILING I ı RIGHT-or-WAY orrERED TO TO\VNSHIP BY PLAN or SUBDIVISION or GOSHEN CORPORATE PARK MADE BY HENRY s. COll{REY. INC., DATED 4/30/1981, IJ LAST REVISED 8/18/1982 AND RECORDED AS CHESTER COUNTRY PLAN #4193 ON 11/16/1982, TO BE ACCEPTED THROUGH TO\VNSHIP RESOLUTIOII{. ----------..
0
r: · uS ::::> z F
PLAN OF REQUIRED SIDEWALK EASEijENT FOR LANDS OF ACERO HOLDINGS LLC {UPI 153-4-168 AND 153-4-169)
SITUATE 1N EAST GOSHEN TOWNSHIP. CHESTER COUNTY. PA.
835 SPRINGDALE DRIVE SUITE 200 EXTON, PA. 19341 TELE: (610)-594-9995 FAX: (610)-594-9565 (lCMAHON
IUANPOUIAIION I NGINIIUS PI/\NNll-tS
3/4/20 JOB #816417.20 SCALE: 1" = so· SHEET: 1 of 3
tiQ!ES.: 1) THE LEGAL RIGHT-OF-WAY V/IDTH ON PAOLI PIKE SR 2014, FORMERLY TOTAL AREA OF REQUIRED ROUTE NO. 143 FROM STA. 104+23.46 TO STA. 128+94.65 IS 40 FEET - 7561 SF O 174 AC BASED ON FINAL DRAV/INGS FOR CONSTRUCTION AND CONDEMNATION OF - -""'--'-- ' -· -- RIGHT-OF -WAY F"OR ROUTE 143 SECTION 2, DATED OCTOBER 4, 1945 AND SIGNED BY THE GOVERNOR EDWARD MARTIN ON APRIL 25, 1946.
TOT AL AREA oF IEMP-:-CillfsTR. EASEMENT
V 5427 SF, 0.125 AC J
2) ,TmPORAR'i'ÿCONSTROCTitllrEASEf;lrnT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLAN IS C0MPLETED, UNLESS SOONER RELINQUISHED IN \VRITING BY EAST GOSHEN TO3SHIP.
3) &PEW&KĀWWHO AN EASEMENT FOR THE CONSTRUCTION, INSPECTION.āNTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEV{ALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY O3ER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
4) THE BEARING SYSTEM IS BASED ON THE PROJECT DATUM: PENNSYLVANIA STATE PLANE COORDINATE SYSTEM (NAO 83).
REQUIRED SIDEWALK EASEMENT LINE TABLE LINE BEARING DISTANCE -
ACERO HO/..Dt/,/GS LLC
UPI '55-4-169
REQUIRED lRAFFIC SIGNAL EASEMENT
TEME'ORARY-COIIISJRLLCJIOI\I_EASEMEl'fl
10' WJOE SHARED USE PATH
·LEGAi. Rh L/lfC {r,/P) ·LCCAI. Rh L/lfC -
SHOULDER (TBR) -45.
L1 N31.36'15"W L2 N69.0S44"E L3 N5T00'31"E L4 N58.30'52"E L5 N6a•22'45"E
7.29' 147.40' 140.09' 324.48' 100.00·
>-
• ! ;--! ii =" m-:-,-#$-%-ll-i-l--i-1&-t-:-:
5-}·=!- ::33 3)J
1 J - L6 N36.50'17"E 40.85' L7 S31 •37'15"E 26.24' LS s5a·35•2a·w 349.85' L9 S58'2a•o5•w 343.99' L10 s59•42'37"W 56.01'
17'77771 REQUIRED SIDEWALK t:CLLL'.I EASEMENT Rx'XXJ REQUIRED TRAFFIC ă SIGNAL EASEMENT II SHARED USE PATH PLCC PLAIN CEMENT L__j CONCRETE CURB
01t
I I ·➔- f ,,._ • r
-
j L -l _.J_ --= =r=
z F 8
ASPHALT DRIV£JYAY
EDGE OF PAV£Ă},/T SR 2014 R/W & C°""STR. fl
7p
Ą
RIGHT-OF-WAY OFFERED TO TO3SHIP BY PLAN OF SUBDIVISION OF GOSHEN CORPORATE PARK MADE BY HENRY S. C0NREY, INC., DATED 4/17/1981, I
LAST REVISED 9/14/1981 AND RECORDED AS CHESTER COUNTRY PLAN #3852 ON 1/15/1982, ACCEPTED THROUGH TO3SHIP RESOLUTION #2017-172.
I '- t
9:: "' ..!.
Q:
\ I I \ I \ I
/
PLAN OF REQUIRED SIDEYfALK EASEijENT FOR LANDS OF ACERO HOLDINGS LLC {UPI 153-4-168 AND 153-4-169)
SITUATE 1N EAST GOSHEN TOWNSHIP. CHESTER COUNTY. PA.
835 SPRINGDALE DRIVE SUITE 200 EXTON, PA. 19341 TELE: (610)-594-9995 FAX: (610)-594-9565 <l,MCMAHON
lt(/\N .. POl.tlAIION INGINllt(S & PIANNlllS
3/4/20 JOB #816417.20 SCALE: 1" = 60' SHEET: 2 of 3
ó 1) THE LEGAL RIGHT-OF-WAY WIDTH ON PAOLI PIKE SR 2014, FORMERLY ROUTE NO. 143 FRQM STA. 104+23.46 TO STA. 128+94.66 IS 40 FEET BASED ON FINAL DRAWINGS FOR CONSTRUCTION AND CONDEMNATION OF RIGHT-OF-WAY FOR ROUTE 143 SECTION 2, DATED OCTOBER 4, 1945 AND SIGNED BY THE GOVERNOR EDWARD MARTIN ON APRIL 25, 1946.
2) .IEME.ORARY.:CON.S..1RUCJ1.0N:EASEMEl'H. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICA TED BY THE PLAN IS C0MPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY EAST GOSHEN TOWNSHIP.
3) TRAEFIC SIGNbL EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, OPERATION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A TRAFFIC SIGNAL AND APPURTENANCE THERETO. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR TRAFFIC SIGNAL PURPOSES.
4) THE BEARING SYSTEM IS BASED ON THE PROJECT DA TUM: PENNSYLVANIA STATE PLANE COORDINATE SYSTEM (NAD 83).
REQUIRED TRAFFIC SIGNAL
EASEMENT LINE TABLE LINE BEARING DISTANCE TL1 N31·3,15•w 26.24' TL2 N49"34'29.E 52.2, TL3 s31·24'32•E
9.44'
TL4 S58"36'28"W 26.62' T
CURVE RADIUS LENGTH CHORD BRG CHORD C1 25.00 39.21 S13"35'55 35.36'
F7777) REQUIRED SIDEWALK rLL.LLI EASEMENT R><XXJ REQUIRED TRAFFIC ü SIGNAL EASEMENT II p cc PLAIN CEMENT L____j SHARED USE PATH L CONCRETE CURB
,------------------ ------:;..-:.,-:..,--:---:-=-----v
TOTAL AREA OF REQUIRED TRAFFIC SIGNAL EASEMENT TOTAL AREA OF TEMP:""CONSTEMENT
- 1431 SF, 0.033 AC = 5427 SF, _.QJl§_ AC
. .
AC£RO HOi.Dll-(CS LLC
UPI ,53-4-169
REQUIRED TRAmC SIGNAL EASEMENT
TEMPORAAY-CONSTRCJCTION'""EASEMENT
10' WIDE SHARED USE PATH
·LEGAi. R/W LIit£ (TWP) ·LCGAI. R/W LIit£ _ SHOULDER (TBR) -45.
I p / f / / / f /GRASS \ ½./ 6-vv > iii ti '({( \ L&J -a I"' I I - I ,T ➔ -• --'· -···- , - ·-- f =i==r
0 L&J ::, z z 0 u
ASPHALT/ DRIVEWAY
£DC£ OF PA lif"A,f"N T SR 2014 R/W &: CQNSTR. i
t '-
1
ô õ i ..
ö÷ ø 'It Q: ..!. i ù ú
û
\
\
\
l I I
ý RIGHT-OF-WAY OFFERED TO TOWNSHIP BY PLAN OF SUBDIVISION OF GOSHEN CORPORATE PARK MADE BY HENRY S. CONREY, INC., DATED 4/17/1981, þ LAST REVISED 9/14/1981 AND RECORDED AS CHESTER COUNTRY PLAN #3852 ON 1/15/1982, ACCEPTED THROUGH TOWNSHIP RESOLUTION #2017-172.
PLAN OF" REQUIRED TRAFFIC SIGNAL EASEijENT FOR LANDS OF" ACERO HOLDINGS LLC
(UPI #53-4-168 AND #53-4-169) SITUATE 1N EAST GOSHEN TO$SHIP. CHESTER COUNTY. PA.
835 SPRINGDALE DRIVE SUITE 200 EXTON, PA. 19341
TELE: {610)-594-9995 FAX: {610)-594-9565 (1
1MCMAHON
I R/\NPOl.! I /\IION I NGINI I S .S. Pl /\NNl llS
3/4/20 JOB #816417.20 SCALE: 1" = 60' SHEET: 3 of 3
t:iQru.: 1) THE LEGAL RIGHT-OF-WAY WIDTH ON PAOLI PIKE SR 2014, FORMERLY ROUTE NO. 143 FR¶ STA. 104+23.46 TO STA. 128+94.65 IS 40 FEET BASED ON FINAL DRAWINGS FOR
CONSTRUCTION AND CONDEMNATION OF RIGHT-OF-WAY FOR ROUTE 143 SECTION 2, DATED OCTOBER 4, 1945 AND SIGNED BY THE GOVERNOR EDWARD MARTIN ON APRIL 25, 1946.
2) iJEM2-0RARX....COJ\ISIBU.CJ ON;.£ASEMEI\IL AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICA TED BY THE PLAN IS COMPLETED. UNLESS SOONER RELINQUISHED IN WRITING BY EAST GOSHEN TOY{NSHIP.
TOTAL AREA OF REQUIRED RIGHT-OF-WAY
.fil!.&_ SF, 0.140 AC I
3) ·¸7,':,"'TfT'A'¹º ..... "'ll. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OY(NER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
4) THE BEARING SYSTEM IS BASED ON THE PROJECT DATUM: PENNSYLVANIA STATE PLANE COORDINATE SYSTEM (NAD 83).
REQUIRED RIGHT-OF-WAY
LINE TABLE LINE BEARING DISTANCE L1 N31°17'42"W 31.36' L2 N60°13'21 "E 201.23' L3 S29°46'39"E 29.66°
L4 s59•42•3,w 200.41'
1351 PAOLI PIK£ ASSOC/A TES. LP UPI 53-4-166
LEGAL R/,r L» {r,IPJ
LEGAL R/,r L»
D
SHARED USE PATH t'/'./ //J
REQUIRED SIDEWALK r.t'. ........ .._//
.._//
..., _/1
_. EASEMENT 9] SELECTIVE TREE REMOVAL
U/P
SR 2014 R/W & CoNSTR.. fl
£OGE OF PA VE)/£},( T
WR£ FENCE
(TBR)
¼ REQUIRED RIGHT ½ -OF-WAY -0- NEW PATH PROTECTIVE RAILING I ¾ ELEVATED SHARED I ¿ USE PATH STRUCTURE
À,.=;,.;;;a;;;;;;;,;,
RIGHT-OF-WAY OFFERED TO TOY(NSHIP BY PLAN OF SUBDIVISION OF GOSHEN CORPORATE PARK MADE BY HENRY S. CoNREY, INC •• DATED 4/30/1981. ÁÂÃÄ LAST REVISED 8/18/1982 AND RECORDED AS CHESTER COUNTRY PLAN #4193 ON 11/16/1982, TO BE ACCEPTED THROUGH TOY{NSHIP RESOLUTION.
PLAN OF" REQUIRED RIGHT-OF-WAY FOR LANDS OF" 1351 PAOLI PIKE ASSOCIATES, LP
(UPI 153-4-166 AND 153-4-167)
835 SPRINGDALE DRIVE SUITE 200 EXTON, PA. 19341
TELE: (610)-594-9995 FAX: (610)-594-9565
SITUATE IN EAST GOSHEN TOwNSHIP, CHESTER COUNTY, PA.
(lf"\-CMAHON
11/\N<,POlI/\IION lNGINII l... PIANNlUS
3/4/20 JOB #816417.20 SCALE: 1" = 60' SHEET: 1 of 2
N .... l!i i .lse :::, z i=
tiQ!ES; 1) THE LEGAL RIGHT-OF-WAY V,,DTH 0N PAOLI PIKE SR 2014, FORMERLY ROUTE NO. 143 FROM STA. 104+23.46 TO STA. 128+94.65 IS 40 FEET BASED ON FINAL DRAV,,NGS FOR
CONSTRUCTION AND CONDEMNATION OF RIGHT-OF-WAY FOR ROUTE 143 SECTION 2, DATED OCTOBER 4, 1945 AND SIGNED BY THE GOVERNOR EDWARD MARTIN ON APRIL 25. 1946.
2) "TE.QEOĊARTCUl'fSJR!JCTIOfil.:EASrntfrr: AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLAN IS COMPLETED, UNLESS SOONER RELINQUISHED IN VfRITING BY EAST GOSHEN TO\¥NSHIP.
[TOTAL AREA OF
6370 SF, 0, 146 AC I TOT AL AREA OF (f£Me.._CQN_SIEC£ASEMEN.I
= 10847 SF, 0.249 AC
1351 PAOLI PIKE ASSOC/A TES. LP UPI '53-4-167 I
3) "'''·"'·u•:•"'·'-ċČ·1č,n AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR,
RECONSTRUCTION AND ALTERATION OF A SIDEWALK. THE EASEMENT SHALL NOT PREVENT THE PROPERTY O\¥NER FROM MAKING ANY LEGAL USE OF THE AREA VfHICH IS NOT DETRIMENTAL TO ITS USE FOR SIDEWALK PURPOSES.
4) THE BEARING SYSTEM IS BASED ON THE PROJECT DATUM: PENNSYLVANIA STATE PLANE COORDINATE SYSTEM (NAD 83).
REQUIRED SIDEWALK EASEMENT LINE TABLE LINE BEARING DISTANCE SL1 N29"46'39"W 29.56' SL2 N68'31'02"E 163.27' SL3 N59'42'43"E 485.00' SL4 N59'03'44"E 107.17' SL5 S31 '36'15"E 7.29 SL6 S59'42'37"W 411.17' SL7 S59'42'37"W 332.89'
...
·=RE FENCE (TBR)
TEMPORARY CONSTRUCTION EASEMENT
ĎQQIREPďEWADCEASEMEND
10' WIDE SHARED USE PATH
.!£GA£ R,/W L6fC (T'flPJ
-LEGAL R/W £¥ STONE WALL
(TBR)
U/P .£OGE OF PA V£)/ENT SR 201.4 R/W & CĐSTR. fl \
I
ē
y,-TU .,....-rr-F •\,_ ),.. '-. GRASS \Ĕĕ ___ _,,, if V) Cl: ĖCl
r//.//1
REQUIRED SIDEWALK !'.'.'.L ........... //
.., //
..._ _./1
_. EASEMENT D
SHARED USE PATH I. . : . ·,: I
DRIVEWA y . : . . . . . ADJUSTMENT
SELECTIVE TREE REMOVAL
£ iL-
đ RIGHT-OF-WAY OFFERED TO TO\¥NSHIP BY PLAN OF SUBDIVISION OF GOSHEN CORPORATE PARK MADE BY HENRY S. C0NREY, INC., DATED 4/30/1981, Ē LAST REVISED 8/18/1982 AND RECORDED AS CHESTER COUNTRY PLAN #4193 ON 11/16/1982, TO BE ACCEPTED THROUGH TO\¥NSHIP RESOLUTION.
PLAN or REQUIRED SIDEV(ALK EASEijENT FOR LANDS or 1351 PAOLI PIKE ASSOCIATES. LP
(UPI 153-4-166 AND 153-4-167)
835 SPRINGDALE DRIVE SUITE 200 EXTON. PA. 19341 TELE: (610)-594-9995 F'AX: (610)-594-9565
SITUATE 1N EAST GOSHEN TOWNSHIP. CHESTER COUNTY. PA.
l"\CMAHON
l/\NSPORI/\IION INGINllt-lS .S. PI/\NNll?S
3/4/20 JOB #816417.20 SCALE: 1
M = 60' SHEET: 2 of 2
l's'
II \
Site plan drawing, landscape orientation, partially covered by a diagonal “Unofficial Copy” watermark: “Plan of Subdivision of Goshen Corporate Park, East Goshen Township, Chester County, PA”, Phase II Final Title Plan, by Henry S. Conrey Inc., Division of Chester Valley Engineers, Paoli, PA (job 10114, dated 4-30-81). It shows a U-shaped road, Enterprise Drive, with numbered lots (about 4 to 6 acres each) on both sides, drainage and sanitary sewer easements, a phase line separating this section from existing Phase I, and Meadow Drive meeting Paoli Pike (L.R. 143) along the right edge. A narrow strip along Paoli Pike on the right side of the plan is highlighted in pink/red. Adjoining owners are labeled along the left (including Sycamore Drive and “Grand Oak Run” subdivision) and bottom edges (including Ira & Dorothy E. Hicks). Approval signatures and stamps appear at the right.
PHASE II
FINAL TITLE PLAN
Graphic scale (0 to 200 FT.)
Plan of Subdivision of Goshen Corporate Park
East Goshen Township – Chester County – PA.
Henry S. Conrey Inc., Division of Chester Valley Engineers, 100 W. Lancaster Ave., Paoli, PA
Job 10114; scale 1" = 80'; date 4-30-81; sheet 2 of 6 [partly illegible]
Legend
- New lot from tract [partly illegible]
- Old lot line
- New lot line
- Old lot number
- New lot number
Zoned I-1 Limited Industrial [partly illegible]
| Requirement | Value |
|---|---|
| Min. Lot Area | 4 Acres |
| Width | 400' @ Bldg. Line |
| Coverage Max. | 35% Max. |
| Setback | 100' |
| Rear Yard | 50' |
| Side Yard | 50' (each) |
| Height Max. | 45' |
| Paved Max. | 50% of Lot |
Recorded in Chester Co. Pa. in Plan 4193 [partly illegible]
General Notes
| Item | Value |
|---|---|
| Total Area of Tract | 106.336 Acres [partly illegible] |
| Total Area (This Section) | [illegible] Acres |
| Total No. of Lots | [illegible] |
| Total No. of Lots (This Section) | [illegible] |
Public water supply and sewage disposal system to be provided.
Monuments shown thus “■” are to be placed upon completion of lot grading.
All road right-of-ways, easements and streets shall be offered for dedication to East Goshen Township.
Existing trees in buffer strip to remain and in areas where none exists, screening is to be provided.
Equitable Owner & Developer
Brush/Lowe Associates, Inc.
P. O. Box 7
Marlen Station, Pa. 19066 [partly illegible]
(215) 647-2661 [partly illegible]
I hereby certify that this plan has been made under my immediate supervision and conforms to all engineering, design, building and other applicable East Goshen Township Ordinances and regulations. Certified this ______, ____________, 19__. [signature and seal]
I-1 Light Industrial Uses [partly illegible]
In I-1 districts land, buildings or premises shall be used by right for only one or more of the following:
- Research, engineering or testing laboratories.
- Any production, processing, cleaning, testing, repair, storage & distribution of materials, goods, foodstuffs and products not involving a retail activity on the lot.
- Public utility installations and public service structures.
- Truck freight terminal.
- Printing and publishing establishments.
- Administrative activities and offices.
- Agricultural uses, as prescribed by Farm Regulations, Section 501.
Accessory Uses: Only the following accessory uses shall be permitted:
- Restaurant, cafeteria or recreational facilities for employees.
- Identification signs referring to the principal activities performed on the parcel or to the person or firm performing those duties subject to Section 501 of this ordinance.
Utilities
- ARCO Pipe Line Co., P. O. Box 2084, Hickins Spring, Pa. 19608, 1-215-478-6005 [partly illegible]
- Bell Telephone, P. O. Box 131, Chadds Ford, Pa. 19317, 1-215-459-3980
- Great Valley Water Co., 455 Lancaster Pike, Malvern, Pa. 19355, 1-215-644-3395
- Philadelphia Electric Co., 175 North Cain Road, Coatesville, Pa. 19320, 1-215-383-7700
- Transcontinental Gas Pipeline Corp., Fraser, Pa. 19355, 1-215-644-7373
Notary Acknowledgment
Commonwealth of Pennsylvania, County of Chester. On the ____ day of ________ A.D. 19__ before me, the subscriber, a Notary Public of the Commonwealth of Pennsylvania, residing in ________ personally appeared ________ who acknowledged himself to be the ________ of ________, a corporation, and that as such he, being authorized to do so, executed the foregoing plan by signing the name of the said Corporation by himself as ________ that the said Corporation is the owner of the designated land, that all necessary approval of the plan has been obtained and is endorsed thereon and that the said Corporation desires that the foregoing plan may be duly recorded. Notary Public. My Commission Expires: ________
Approvals
Approved by East Goshen Township Board of Supervisors this [illegible] day of September, 19[illegible] [signed by Chairman, Supervisor, Vice-Chairman].
Approved by East Goshen Township Planning Commission this [illegible] day of September, 19[illegible] [signed by Chairman, Vice-Chairman, and members].
Approved by East Goshen Township Engineer this ________, 19__. Engineer: ________
Reviewed. Approved by the Chester County Planning Commission this [illegible] day of August [illegible], 1981. [signed]
Revisions
| No. | Date | Description |
|---|---|---|
| [illegible] | [illegible] | [illegible] |
| [illegible] | [illegible] | [illegible] |
| 7 | [illegible] | [illegible] Brush/Lowe Associates [illegible] |
| 6 | [illegible] | Comply with Township staff [illegible] |
| 5 | [illegible] | Per County Planning Comm. letter 7-14-81 [partly illegible] |
| 4 | [illegible] | “Phase” changed to “Final” [partly illegible] |
| 3 | [illegible] | [illegible] |
| 2 | [illegible] | [illegible] |
| 1 | [illegible] | [illegible] |
Assessment Map 53-4, Parcel 13 [partly illegible]
AECOM
April 7, 2020
East Goshen Township 1580 Paoli Pike
AECOM
625 West Ridge Pike, Suite E-100 Conshohocken, PA 19428
West Chester, PA 19380-6199 Phone: 610-692-7171
Re: Texas Eastern Transmission, LP
General Permit Application 2020 Penn Jersey Integrity - Chester County 2 Chester County, Pennsylvania
Dear Supervisors:
610.832.3500 tel
610.832.3501 fax
Via FedEx: 7701 9051 9237
R
IE CE BVIEn
BY:
APR O 9 2020 u
AECOM has been retained by Texas Eastern Transmission, LP (Texas Eastern) to provide design and permitting services. This notice is to inform you of Texas Eastern's intent to conduct anomaly excavations and repairs along an existing natural gas pipeline under Chapter 105 Water Obstruction and Encroachment General Permit coverage from the Pennsylvania Department of Environmental Protection (PADEP) for the following project:
Project Name: Project Description:
Applicant Name: Applicant Contact:
Site Location: Municipality/County:
2020 Penn Jersey Integrity - Chester County 2 Excavation along an existing natural gas pipeline to determine the nature of the anomalies and complete necessary repairs Texas Eastern Transmission, LP Mr. William B. Brett 890 Winter Street, Suite 300 Waltham, MA 02451 Phone: 617-560-1371
See attached Location Map. East Goshen Township, Chester County, PA
Enclosed are a Location Map and a copy of the General Permit Registration Form, completed by AECOM on behalf of the applicant. PADEP invites you to review the attached form and to comment on the accuracy of answers provided with regard to land use aspects of this project. Please be specific to PADEP and focus on the relationship to local ordinances. If you wish to submit comments to PADEP, you must respond within 30 days to the PADEP regional office referenced in this letter. If you do not submit comments by the end of the comment period, PADEP will assume that there are no substantive conflicts and proceed with the normal application review process.
This letter is intended to satisfy the requirements of Pennsylvania Acts 14, 67, 68, and 127 and the Pennsylvania Municipalities Planning Code. Section 1905-A of the Commonwealth Administrative Code, as amended by Act 14, requires that each applicant for a PADEP permit must give written notice to the municipality(ies) and the county(ies) in which the permitted
AECOM
activity is located. The written notices shall be received by the municipality(ies) and county(ies) at least 30 days before the PADEP may issue or deny the permit.
Acts 67 and 68, which amended the Municipalities Planning Code to support sound land use practices and planning efforts, direct state agencies to consider comprehensive plans and zoning ordinances when reviewing applications for permitting of facilities or infrastructure, and specify that state agencies may rely upon comprehensive plans and zoning ordinances under certain conditions as described in Sections 619.2 and 1105 of the Municipalities Planning Code.
Please submit any comments concerning this project within 30 days from the date of receipt of this letter to the PADEP, Southeast Regional Office, 2 East Main Street, Norristown, PA 19401.
For more information about this land use review process, please contact me at 610-832-3500 or visit www.depweb.state.pa.us (Keyword: Land Use Reviews).
Sincerely,
Bernard Holcomb Project Manager AECOM
Enclosures: Location Map, General Permit Registration Form
3150-PM-BWEW0500 Rev. 5/2019 Form • pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS
CHAPTER 105 WATER OBSTRUCTIONS AND ENCROACHMENT
GENERAL PERMIT REGISTRATION
SECTION A. APPLICANT INFORMATION
'·
D FERC Natural Gas Activity Docket Number Type of Facility Natural Gas Pi(!eline Has a Water Quality Certification (WQC) request been sent to DEP? D Yes □No D Activity Subject to FERC approval and/or Oil & Gas Exploration, Production, Storage or Transmission if the activity is
regulated by FERC and provide the FERC docket number.
Applicant's Name I Client I DEP Client ID# (if known) Employer ID# (EIN) Texas Eastern Transmission, LP 257262 72-0378240
Client Information - Please select Client Type/ Code from drop down box under the correct entity shown below. (or may be written in)
Government Non-Government Individual
NPACO
Mailing Address City State I
ZIP+ 4 890 Winter Street, Suite 300 Waltham MA 02451
Contact Person - Last Name First Ml Suffix Telephone Brett William B (617) 560-1371
Email Address William. Brett@enbridge.com
SECTION B. CONSULTANT INFORMATION (If applicable) 0 NIA
Contact Person - Last Name First Ml Consultants Title Consulting Firm Suffix Project Manager AECOM Technical Services Holcomb Bernard
Mailing Address City State I ZIP +4 625 West Ridge Pike, Suite E-100 Conshohocken PA 19428
Telephone I Fax Employer ID# (EIN) (610) 832-3500 (610) 832-3501 95-2661922
Email Bernard. Holcomb@aecom.com
SECTION C. PROJECT INFORMATION
Project I Site Name DEP Site ID# (if known or leave blank) 2020 Integrity Program - Chester County 2 (19-11753)
!
Client Relationship - Please select Site-to-Client Double-click on shaded area below to select correct Site-to-Client Relationship/ Code from drop down box to the right. (or may Relationship/ Code be written in) -> LESOP Lessee/Operator
County I
Municipality 0 City D Borough Township I Note: Municipal & County Notification is Chester East Goshen Required
Site Location / Address City State I
ZIP+ 4 See Location Map (Sect.2), Aq. Resources Table (Sect.1) West Chester PA 19380
Collection Method: □ EMAP □ HGIS GISDR* □ ITPMP □ GPS □ WAAS □ LORAN
Check the horizontal reference datum (or projection datum) employed in the collection method.
EMAP and HGIS (PNDI) have known datum and do not require checking· here. 0 NAD27 NAD83 0 WGS84 (GEO84) LAT.: See Ag. Resources Table (Sect. 1) LONG.: See Ag. Resources Table (Sect. 1)
NOTE: A Submerged Lands License Agreement (SLLA) with ah annual fee, if applicable, may also be required for your project. You will be notified if an SLLA is required.
The Aquatic Resources Impact Table (SECTION E. PROPOSED IMPACTS) must be completed or equivalent submitted for this registration to be complete.
- 1 -
3150-PM-BWEW0S00 Rev. 5/2019 Form • pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENT AL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS
SECTION D. REGISTRATION CHECKLIST AND REQUIREMENTS
Please place an "X" next to each item (1-9) to ensure it is completed and/or provided.
Unless otherwise specified, all items are required to ensure a complete Registration package .
.. Provide ONE (1) ORIGINAL and ONE (1) COPY of the Registration package ..
Please provide a copy of the Registration form to the Municipality & County in which the work will be performed. Proof of receipt
is not required to be provided to DEP.
1. REGISTERING A GENERAL PERMIT (GP) check all that apply
Federal, State, county or municipal agencies or municipal authorities: □EXEMPT from fees □GP-1 Fish Habitat Enhancement Structures ........................................................... Per Project
□GP-2 Small Docks and Boat Launching Ramps ........................... Per Dock/ Ramp __ (#) x
D GP-3 Bank Rehabilitation, Bank Protection and Gravel Bar Removal ................................................................... Per Project __ (#) x
D GP-4 Intake and Outfall Structures ................................................... Per Structure __ (#) x
D GP-5 Utility Line Stream Crossings ...................... Per Individual Utility __ (#) x __ (#) x
D GP-6 Agricultural Crossings and Ramps ............................... Per Crossing/ Ramp __ (#) x
D GP-7 Minor Road Crossings' ............................................................ Per Crossing __ (#) x
D GP-8 Temporary Road Crossings2 ........................................................... Per Crossing Q_(#) x
D GP-9 Agricultural Activities ...................................................... , ............................. Per Project
D GP-1 0 Abandoned Mine Reclamation ........................................................ ............. Per Project
Ȁ GP-11 Maintenance, Testing, Repair, Rehabilitation, or Replacement of Water Obstructions and Encroachments1 ................... .
ȁ Temporary Disturbance ($400/0.1ac) ....................... 0.1 0 acres x $4,000 = D Permanent Disturbance ($800/0.1 ac) .... --Ȃ-- acres x $8, 000 =
D GP-15 Private Residential Construction in Wetlands' .................... .. D Temporary Disturbance ($400/0.1ac) ..................... .. --ȃ-- acres x $4,000 =
$ 50
$ 175
$ 250
$ 200
$ 250
$ 50
$ 350
$ 175
$ 50
$ 500
$ 750 +
$ 400
$
$ 750
$ __
+
+
+
=$ __
=$ __
=$ __
=$ __
=$ __
=$ __
=$ __
=$Q
=$ __
=$ __
= $ 1 150
D Permanent Disturbance ($800/0.1ac) ..................... .. acres x $8,000 = $ =$ GP(s) FEE subtotal (b) $ 1 150
- 3 -
3150-PM-BWEWOSOO Rev. 5/2019 Form
2. Location Map (USGS quad map) with project site marked:
3. Color Photographs with dates, locations, and descriptions: D GP-3 18] GP-11 □N/A
4. Project Description: (Example: Linear pipeline project using multiple GP-5's and GP-8's; One GP-7 for an access road to my property) See Section 4
5. Site Specific and/or Standard Drawings are (required for all) project's GP activities.
For Activities that qualify for GP-7 or GP-11
Plans, specifications, and reports for bridges and culverts across a stream which are to be used by the general public such as an access to an industrial, commercial or residential development, etc., shall be prepared by a registered professional engineer and shall be affixed with their seal and certification which shall read as follows on the drawings:
If the project includes a bridge or culvert replacement or the proposed work will change the waterway opening, please complete and provide the Bridge and/or Culvert Re12lacement Projects or Projects Thal Change the Waterway_ O12ening (3150-PM-BWEW0552B} worksheet. If the project consists of similar work (replacement or change in waterway opening) on more than one structure, provide the data requested for each structure included in this Registration package.
"/ (name) do hereby certify pursuant to the penalties of 18 Pa. C.S.A. Sec. 4904 to the best of my knowledge, information and belief, that the information contained in the accompanying plans, specifications, and reports has been prepared in accordance with accepted engineering practice, is true and correct, and is in conformance with Chapter 105 of the rules and regulations of the Department of Environmental Protection." 6. Proposed Project Purpose depicting the site of the projects GP activities and impacts. Briefly discuss the need for the authorization.
7. Erosion & Sediment Control Plan (E&S Plan) (Required for all GP's but specifically required with submission with a registration of GP-11 or GP's for oil and gas related activities submitted to DEP.)
8. Pennsylvania Natural Diversity Inventory (PNDI): PNDI Search Receipt and clearance letters, if available. See additional requirements for submission with Avoidance Measures and/or Potential Impacts.
9. Activities which impact wetlands: (For State Regulated Impacts) Please place an "X" next to the appropriate box indicating the information provided:
. ► N/A because no wetland impacts are proposed or no compensatory mitigation is necessary .
► A wetland delineation with complete data sheets in accordance with the 1987 Corps of Engineers
Wetland Delineation Manual AND the appropriate Regional Supplements to the Corps of Engineers Wetland Delineation Manual for use in Pennsylvania . ........................................................................
► If direct or indirect wetland impacts are greater than 0.05 acre, a compensatory mitigation plan in accordance with the Department's Replacement criteria which provides compensation for both affected acreage, and functions at a minimum of one to one ratio. ► If compensatory mitigation onsite is determined not feasible: A check, number __ , in the amount of $ __ payable to the National Fish and Wildlife Foundation, N.A. 1237, as compensatory mitigation for __ acres of impact in wetlands, in accordance with the Pennsylvania Wetland Replacement Project... ....................................................
(Additional Mitigation May Be Required by U.S. Army Corps)
NOTE: If the Pennsylvania Wetland Replacement Fund is proposed to be used as compensatory mitigation for waters of the Commonwealth the U.S. Army Corps of Engineers may also require additional mitigation if the proposed activity impacts waters of the United States.
- 3 -
Applicant DEP Use Entrv Onlv 181 □ 181 □ 181 □
181 □
181 □
181 □
181 □
□ □ 181 □
□ □
□ □
□ □
3150-PM-BWEW0S00 Rev. 5/2019 Form
SECTION E. PROPOSED IMPACTS
NOTE: Fonn 3150-PM-BWEW0557 or equivalent must be printed and submitted under this Section.
TABLE 1 CHAPTER 105 FEE DETERMINATION
Fee Detennination
Method Crossing Resource ID Classification Number GP-11 (#of Waived GP-11 crossings)
1 S-T JS-047 PER - X 1
Totals: - - 1
Permit Fee Calculation Fee Determination Method Annlication Fees Fee Units GP-11 Temporary Disturbance $4,000 I ac 0.10 ac GP-11 Registration Fee $750/oackaae 1 Permanent Disturbance $8,000 I ac 0.0 ac Total Cost=
-4-
Fee Impact Units, ·->>}C, t ' ' --·- Temporary Disturbance
(ac) . . .
0.07
0.07
Cost $400 $750
$0 $1,150
' - , ,- -c .:>;._ __ ,c:1i_.•.,, .. _ · Pennanent/ .· Disturbance_;
.··•-(ac)\f•}.··
-
. · . . . ·:-'\·./•:.·
3150-PM-BWEW0500 Rev. 5/2019 Form
SECTION F. CERTIFICATION
I certify under penalty of law that the information provided in this permit registration is true and correct to the best of my knowledge and information and that I possess the authority to undertake the proposed action. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. (If any of the information and/or
plans is found to be in error, falsified, and/or incomplete, this authorization/verification may be subject to modification, suspension, or revocation in accordance with applicable regulations.) I further certify that this project complies with all the conditions of the general permit.
SJ-- 04/07/2020 Signature of Applicant/ Owner Date
William B. Brett Typed/ Printed Name
Su[!ervisor, Environmental Construction Permitting
Typed / Printed Title
This General Permit shall not be effective until the owner has had their E&S Plan reviewed by the appropriate Regional Office or District,
and, where required, obtained an SLLA from DEP.
THIS ACKNOWLEDGED COPY OF THIS GENERAL PERMIT REGISTRATION PACKAGE AND THE E&S PLAN MUST BE
AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION.
SECTION G. DECISION/ DISPOSITION - COMPLETED BY DEP
Decision Review:
GP DEP / District Reviewer Signature
GP Reviewer's Typed/ Printed Name
NOTE: See Aquatic Resource Impact Table for anl additional authorizations.
Disposition Status Comments □ ACKNOWLEDGED Date
SLLA Required D Yes Attached □No □ INCOMPLETE / DEFICIENCY Date □ EXTENSION REQUEST Date □ WITHDRAWN Date
NOTE: If the GP registration information is incomplete a copy of this registration form and requested additional information will be sent to the applicant. A copy of the returned registration form and additional information must be re-submitted within 60 calendar days unless extended by the extension date listed above.
□ FEDERAL AUTHORIZATION □ Non-reporting PASPGP verification/ authorization attached. □ Reporting - A copy of this General Permit registration package has been sent to the U.S. Army Corps of Engineers. Separate federal authorization may be required NOTE: Please be advised that if the reporting box is checked you do not have Federal authorization for this project and such authorization may be required prior to starting your project. In accordance with Section 404 of the Clean Water Act, a Department of the Army authorization is required for the discharge of dredged and/or fill material into waters of the United States, including jurisdictional wetlands. Section 10 of the Rivers and Harbors Act also requires Department of the Army authorization for any work in, over, or under a navigable water of the United States. In accordance with procedures established with the U.S. Army Corps of Engineers, you will be contacted directly by the Corps regarding Federal Authorization.
- 5 -
e ANOMALY LOCATION
-- CH. 93 STREAM [=] MUNICIPAL BOUNDARY
USGS QUAD NAMES DOWNINGTON AND MALVERN, PA EAST GOSHEN, UWCHLAN, AND EAST WHITELAND TOWNSHIPS, CHESTER COUNTY, PA
TOPO SOURCE: SEAMLESS DIGITAL RASTER GRAPHIC-N.P.S. NATURAL PHYSICAL MAP & U.S.G.S. TOPOGRAPHIC MAP 2013, NATIONAL GEOGRAPHIC SOCIETY, ICU BED
PREPARED BY: JAS
A:COM
FOSTER PLAZA 6 681 ANDERSEN DRIVE, SUITE 120 PITTSBURGH, PA 15220
CHECKED BY: APPROVED BY: MLN SLH
ENBRIDGE
DATE:
1/21/2020
Page 2 of 2
TEXAS EASTERN TRANSMISSION, LP
SCALE:
1 "= 2,000' PROJECT NO.
DRAWING NO. FIGURE 1
LOCATION MAP 2020 INTEGRITY PROGRAM ANOMALIES W.C. 17238.97 AND 44578.82
CHESTER COUNTY, PENNSYLVANIA