Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, November 10, 2020
During this tele-conference BOS meeting, public comment will be handled as follows:
• Participants are asked to call in by 6:55 pm. • Participants will be asked to identify themselves when being accepted into the meeting. • The public will be muted during the meeting when the Board is talking. • For each agenda item that requires a Board vote, the public will be given an opportunity to comment and ask questions. • Participants wishing to comment must state their name and must speak one at a time. • Comments or questions can also be submitted via email to info@eastgoshen.org. • Participants should turn down the volume if they are Iivestreaming the meeting on YouTube.
1. Call to Order (7: 00 PM) 2. Pledge of Allegiance 3. Moment of Silence 4. Announce that the meeting is being livestreamed on YouTube 5. Public Hearing (7:05 PM to 7:25 PM) a. The Board will conduct a public hearing to consider a Pipeline Saturation Ordinance. 6. Chairman's Report (7:25 PM to 7:30 PM) a. The Board met in Executive Session on November 9, to discuss a legal matter and a personnel matter. 7. Emergency Services Reports a. WEGO -none b. Goshen Fire Co -none c. Malvern Fire Co -none d. Good Fellowship -none e. Fire Marshal -none 8. Financial Report - none 9. Approval of Minutes and Treasurer's Report (7:30 PM to 7:35 PM) a. Minutes -October 20, 2020 b. Treasurers Report -November 5, 2020 10. Old Business a. Consider Business Park Task Force (7:35 PM to 7:45 PM) 11. New Business a. Presentation of2021 Budget (7:45 PM to 8:00 PM)
b. Consider support of House Bill 531 (8:00 PM to 8:05 PM)
c. Consider Christmas Tree Sales at 1301 West Chester Pike (8:05 PM 8:10 PM)
d. Consider proposal for Construction Services for Segment A of Paoli Pike Trail (8:10 PM to 8:15 PM) e. Consider recommendations from Pipeline Task Force (8:15 PM to 8:25PM)
f. Consider 2-year DVHT Agreement Addendum (8:25 PM to 8:30 PM)
g. Consider extension for Inspection Agreement for Segment C,D & E of the Paoli Pike Trail (8:30 PM to 8:35 PM)
AGENDA Page -1- November 10, 2020
h. Consider DVRPC Regional Trail Grant Application (8:35 PM to 8:40 PM) i. Consider Declaration of Restrictive Covenant for Milltown Reservoir (8:40 PM to 8:45 PM) j. Consider Solar Ordinance Amendment (8:45 PM to 8:50 PM) 12. Any Other Matter 13. Public Comment - (8:50 PM to 9:20 PM) 14. Liaison Rep011s - none 15. Correspondence, Rep011s oflnterest (9:20 PM to 9:25 PM) a. October 14, 2020 Letter concerning Pipeline Saturation Ordinance b. October 16, 2020 Keystone Collections Audit c. October 18, 2020 Letter concerning Sunoco Pipeline Project d. October 26, 2020 Letter concerning Sunoco Pipeline Project e. October 27, 2020 Letter re Adelphia Pipeline Valve Project. 16. Adjournment (9:25 PM)
Meetings & Dates of Importance
Nov 09,2020 Municipal Authority 07:00 pm Nov 10,2020 Board of Supervisors 07:00 pm Nov 11, 2020 Veteran's Day- Office Closed Nov 12,2020 Pipeline Task Force 06:30 pm Nov 12,2020 Historical Commission Canceled Nov 14,2020 Neighbor-to-Neighbor Day ------------ Nov 14,2020 Shredding at the Park 09:00 am Nov 16,2020 Sustainability Advisory Committee 07:00 pm Nov 17,2020 Board of Supervisors 07:00 pm Nov 18,2020 Conservancy Board 07:00 pm Nov 19,2020 Futurist Committee 07:00 pm Nov 23,2020 Police Commission 03:00 pm Nov 26,2020 Thanksgiving - Office Closed ------------ Nov 27,2020 Office Closed ------------
Newsletter Deadline for Winter 2020: November 25, 2020
The Chairperson, in his or her sole discretion, shall have the authority to reanange the agenda accommodate the needs of other board members, the public or an applicant.
Public Comment - Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting. The Board of Supervisors will allocate a maximum of 3 0 minutes for public comment at each meeting.
Constant Contact - Want more info1mation about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay inf01med about imp011ant local issues. East Goshen communicates information by email
AGENDA Page -2- November 10, 2020
about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org. and click the "E-notification & Emergency Alert" button on the left side of the homepage.
ReadyChesco - Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!
Smart 911 - Smrui 911 is a new service in Chester County that allows you to create a Safety Profile at www.smart9l1.com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would
not otherwise know. Fire crews can anive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members' allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the seru-ch strui faster.
Westtown East Goshen Regional Police Department
Do you want to get the latest news about what is happening with the Westtown-East Goshen (WEGO) Police Depaliment? WEGO has an online tool called CRIME WATCH that.gives the public direct access to crime and public safety related information happening in our community. Local residents are encouraged to visit the website and connect with the police department social media sites. To sign up for CRIME WATCH, htt;ps://chester.crimewatchpa.com/wegopd/53548/content/links.
F:\Data\Shared Data\Agendas\Board of Supervisors\2020\2020-11-1 0_Board of Supervisors Agenda with time.doc
AGENDA Page -3- November 10, 2020
NOTICE IS GIVEN that the Board of Supervisors of East Goshen Township will conduct a public hearing on Tuesday, November 10, 2020 as part of the regularly scheduled public meeting which begins at 7:00 p.m., prevailing time to consider and possibly adopt an Ordinance with the following title:
AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP CODE TO ADD A NEW CHAPTER 171 TITLED "PIPELINE SATURATION ORDINANCE".
If adopted, the Ordinance would prohibit new natural gas pipelines and hazardous liquid pipelines from being installed in the Township after the effective date of the Ordinance.
Due to the COVID-19 public health crisis, the hearing and public meeting will not be in-person and instead members of the public are invited to participate via tele conference by dialing (929) 205-6099 or (301) 715 8592; Access Code: 880-7329-8513.
The complete verbatim text of the proposed Ordinance is available for public inspection and may be examined without charge or obtained for a charge not greater than the cost thereof by calling the Township's administrative offices at (610) 692-7171 from 8:00 a.m. to 5:00 p.m., Monday through Friday. The Ordinance is also on file for public inspection at the offices of the Daily Local News by calling 215-648-1066 and the Chester County Law Library, Chester County Justice Center, Suite 2400, 201 W. Market Street, West Chester, PA 19380, where the same may be examined without charge. If any person requires an accommodation to participate in the hearing, please contact the Township building at least 24 hours in advance of the hearing at (610) 692-7171.
Kristin S. Camp, Esquire East Goshen Township Solicitor
PLEASE PUBLISH ON NOVEMBER 1, 2020
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. 2020-__
AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP CODE TO ADD A NEW CHAPTER 171 TITLED "PIPELINE SATURATION ORDINANCE".
WHEREAS, Article 1, Section 1 of the Pennsylvania Constitution reads as follows:
1. Inherent rights of mankind. All men are born equally free and independent, and have certain inherent and indefeasible rights, among which are those of enjoying and defending life and liberty, of acquiring, possessing and protecting property and reputation, and of pursuing their own happiness (emphasis added).
WHEREAS, Article 1, Section 2 of the Pennsylvania Constitution reads as follows:
2. Political powers. All power is inherent in the people, and all free governments are founded on their authority and instituted for their peace, safety and happiness. For the advancement of these ends they have at all times an inalienable and indefeasible right to alter, reform or abolish their government in such manner as they may think proper (emphasis added).
WHEREAS, Article 1, Section 25 of the Pennsylvania Constitution reads as follows:
25. Reservation of powers in people. To guard against transgressions of the high powers which we have delegated, we declare that everything in this article is excepted out of the general powers of government and shall forever remain inviolate (emphasis added).
WHEREAS, Article 1, Section 26 of the Pennsylvania Constitution reads as follows:
26. No discrimination by Commonwealth and its political subdivisions. Neither the Commonwealth nor any political subdivision thereof shall deny to any person the enjoyment of any civil right, nor discriminate against any person in the exercise of any civil right
(emphasis added).
WHEREAS, Article 1, Section 27 of the Pennsylvania Constitution reads as follows:
1
27. Natural resources and the public estate. The people have a right to clean air, pure water, and to the preservation of the natural, scenic, historic and esthetic values of the environment. Pennsylvania's public natural resources are the common property of all the people, including generations yet to come. As trustee of these resources, the Commonwealth shall conserve and maintain them for the benefit of all the people (emphasis added).
WHEREAS, the Second Class Township Code, 53 P.S. §65101 et seq., (the "Code") was reenacted and amended on November 9, 1995.
WHEREAS, Section 607(1) of the Code, which sets forth the duties of Supervisors, reads as follows:
Section 607. Duties of Supervisors.--The board of supervisors shall:
(1) Be charged with the general governance of the township and the execution of legislative, executive and administrative powers in order to ensure sound fiscal management and to secure the health, safety and welfare of the citizens of the township (emphasis added).
WHEREAS, the Board of Supervisors of East Goshen Township ("the Board") finds that with the completion of the Sunoco Mariner East Project, East Goshen Township ("the Township") will be traversed by eleven natural gas and/or hazardous liquid pipelines (the "Pipelines").
WHEREAS, the location for most of the Pipelines was determined decades ago, when the Township was a rural township with much less density and a population of less than 1,000 residents.
WHEREAS, the Township is almost fully developed with over 18,000 residents.
WHEREAS, properties through which these Pipelines traverse that were once fïe now developed with single family homes, apartments, condominiums, life care facilities, businesses and commercial establishments.
WHEREAS, these Pipelines are in close proximity to these single-family homes, apartments, condominiums, life care facilities, businesses, commercial establishments, recreational facilities, churches and schools.
WHEREAS, the construction of a new pipeline necessarily involves sustained disruption to the residents of the Township.
WHEREAS, the Board finds that the installation of any new pipelines in the Township would infringe on Township resident's rights under Article 1, Sections 1, 2, 25, 26 and 27 of the Pennsylvania Constitution.
2
WHEREAS, each of the Board members took an oath of office to "support, obey and defend the Constitution of the United States and the Constitution of this Commonwealth" (emphasis added).
NOW THEREFORE, pursuant to the Board's power to adopt ordinances necessary to secure the health, safety and welfare of the citizens of the Township pursuant to Section 1506 of the Second Class Township Code, 53 P.S. §66506, and pursuant to the aforementioned Sections 1, 2, 25, 26, and 27 of Article 1 of the Pennsylvania Constitution, the Board enacts and ordains as follows:
SECTION 1. A new Chapter 171 titled "Pipeline Saturation Ordinance" shall be adopted and codified in the East Goshen Township Code as follows:
"CHAPTER 171 PIPELINE SATURATION ORDINANCE.
§ 171-1. Definitions.
The following words and terms shall, for the purposes of this chapter, have the meanings shown herein:
Existing Natural Gas Pipeline- a Natural Gas Pipeline that is existing or in the process of being constructed in the Township as of the Effective Date of this Ordinance.
Existing Hazardous Liquid Pipeline - a Hazardous Liquid Pipeline that is existing or in the process of being constructed in the Township as of the Effective
Date of this Ordinance.
Hazardous Liquid Pipeline - any pipeline regulated by CFR Title 49, subtitle B, Chapter 1, subchapter D, Part 192.
Natural Gas Pipeline - any pipeline regulated by CFR Title 49, subtitle B, Chapter 1, subchapter D, Part 195.
Person - a human being, partnership, company, firm, corporation.
Repair - to fix, restore or mend an Existing Natural Gas Pipeline or Existing Hazardous Liquid Pipeline.
Replace - to install a new Natural Gas Pipeline or Hazardous Liquid Pipeline in the same place of an Existing Natural Gas Pipeline or Existing Hazardous
Liquid Pipeline.
§ 171-2. General Provisions.
After the Effective Date of this Ordinance, no Person shall construct a new Natural Gas Pipeline or Hazardous Liquid Pipeline within the boundaries of East Goshen Township.
3
§ 171-3. Replacement of an Existing Natural Gas and Existing Hazardous Liquid Pipeline.
An Existing Natural Gas Pipeline and Existing Hazardous Liquid Pipeline within the Township may be replaced provided that the location of the replaced pipeline is confined to the same property or easement.
§ 171-4. Repairs of an Existing Natural Gas and Existing Hazardous Liquid Pipeline.
An Existing Natural Gas Pipeline and Existing Hazardous Liquid Pipeline may be repaired without any limitation.
§ 171-5. Enforcement.
A. Any Person who violates or permits the violation of any provision of this ordinance shall, upon conviction thereof in a summary proceeding brought before a District Justice under the Pennsylvania Rules of Criminal Procedure, be guilty of a summary offense and shall be subject to the payment of a fine of not less than $100 and not more than $1,000, plus the costs of prosecution. In default of payment thereof, the defendant may be sentenced to imprisonment in the county prison for a term of not more than 30 days. Each section of this ordinance violated shall constitute a separate offense and each day or portion thereof in which a violation of this ordinance is found to exist shall constitute a separate offense, each of which violations shall be punishable by a separate fine imposed by the District Justice of not less than $100 and not more than $1,000, plus the costs of prosecution, or upon default of payment thereof, the defendant may be sentenced to imprisonment in the county prison for a term of not more than 30 days. All fines and penalties collected for the violation of this ordinance shall be paid to the Township Treasurer.
B. If any Person constructs or installs a Natural Gas Pipeline or Hazardous Liquid Pipeline in violation of this ordinance, the Township, in addition to other remedies, may institute any appropriate action or proceeding to prevent, restrain, correct or abate such installation or construction.
SECTION 2. Severabilitv. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal, or invalid, such unconstitutionality, illegality, or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal, or invalid sentence, clause, section, or part thereof not been included herein.
4
SECTION 3. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 4. Effective Date. This Ordinance shall become effective five days following enactment.
ENACTED AND ORDAINED this __ day of _____ } 2020.
ATTEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
E. Martin Shane, Chairman
David Shuey, Vice-Chairman
Michael P. Lynch, Member
Michele Truitt, Member
John Hertzog, Member
F:\Data\Shared Data\Adrnin Dept\Township Code\Pipeline Saturation\Draft Ordinance 100720.docx
5
1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, OCTOBER 20, 2020 5 DRAFT MINUTES 6 7 Note: In light of the Coronavirus pandemic, this was a virtual video-conference meeting 8 conducted via the Zoom platform. In response to media reports about the vulnerability of the 9 Zoom platform, public participation was limited to telephone. 10 11 Present: Chairman Marty Shane; Vice-Chairman David Shuey; Members Michele 12 Truitt, Mike Lynch and John Hertzog; Township Manager Rick Smith; Assistant 13 Township Manager and Finance Director Jon Altshul; Park & Recreation Director 14 Jason Lang; Police Chief Brenda Bernot; Caroline Hughes, Bill Wegemann, Christina 15 Morley and Judi DiFonzo (Pipeline Task Force); Fire Marshal Carmen Battavio 16 17 Call to Order & Pledge of Allegiance 18 Marty called the meeting to order at 7:00 p.m. and led the pledge of allegiance. David 19 called for a moment of silence in honor of our troops, public health workers and first 20 responders. Marty also announced that the meeting is being livestreamed on 21 YouTube. 22 23 Consider Zoning Hearing Board Application for Dimensional Variance Relief 24 for Jordan property. 1631 E. Strasburg Rd 25 Richard Stratton, Chester Valley Engineers, and Brian Nagle, were present to discuss 26 the application for dimensional relief at 1631 E. Strasburg Drive, where the property 27 owners would like to build a house on a parcel with steep slopes and wetlands. 28 Michele asked a number of questions about the impact of the proposed project on 29 adjacent property owners, to which Mr. Stratton replied there would be no impact. 30 31 David made a motion to support this dimensional variance request to permit 3 2 encroachment into the steep slope areas of the lot as depicted in the grading and 33 erosion control plan for Robert Jordan dated 5/29/2020 for the following reasons: 34 35 1. The unique physical circumstances of the parcel shape and topography have 36 created this hardship. 37 2. The physical circumstances of the lot prohibit the parcel from being 38 developed in accordance with the ordinance. 39 3. The unique physical shape of the lot was created to accommodate the 40 previous historic structure and was not created by the applicant. 41 4. The dimensional variance relief sought by the applicant will have no adverse 42 effect on the essential character of the neighborhood. 43 5. The relief sought is the minimal relief needed to construct a single family 44 home in keeping with the surrounding character of the neighborhood. 45
10/20/20 October 20, 2020 1
1 Michele seconded. The motion passed 4-1, with Mike opposed on the ground that he 2 believes that the relief requested was not the minimum amount needed and because 3 he believes the Board should take no position on Zoning Hearing Board matters. 4 5 Pipeline Whistleblower Matter 6 David read the following statement: "The Board of Supervisors and the Pipeline 7 Task Force were recently made aware of a whistleblower complaint involving the 8 Sunoco/ET Mariner pipeline. This matter involves a dispute regarding geophysical 9 surveys required for Horizontal Directional Drilling conducted along North Chester 10 Road. The Board of Supervisors takes this matter very seriously and is conferring 11 with legal counsel to determine next steps." 12 13 David added that the Township, or its counsel, has taken the following steps:
14 • Coordinated with the Chester County's counsel on the matter 15 • Interviewed the whistleblower and their counsel 16 · • Staff has received permission from the impacted property owner to mow and 17 monitor and stake a possible depression 18 • Reviewed the Township's Erosion and Stormwater permit 19 • Consulted with PennDOT, PUC and DEP on the matter 20 • Filed a Right-to-Know Requests with the PUC, DEP and the Attorney General 21 22 Ms. Hughes stated her concern about the lack of information and incomplete 23 information from Sunoco about these matters, and highlighted the need for a proper 24 geological study in these sensitive areas. She encouraged the Board to revoke 25 Sunoco's E&S permit. 26 27 Mr. Wegemann asked about the Township options and a timeline for stopping the 28 pipeline construction. David responded that we are still in the fact-finding stage, and 29 that we need to collect all the information before the Township can determine the 30 appropriate next steps. Rick added that we can revoke Sunoco's E&S permit, but we 31 need to work with our counsel on the appropriate course of action. 32 33 Ms. Morley stated that the Township needs to decide when "enough is enough". 34 35 Ms. DiFonzo asked for a timeline on when the Township learned about the 36 complaint. David stated that the Township was informed about the complaint on 37 Saturday, October 9, and had been working on it continuously since then. He noted 38 that the complaint was filed in August and that various state and County officials 39 were cc'd on the complaint, but that no one ever thought to notify the Township. 40 41 John noted that East Goshen is the only entity that's doing anything about the 42 complaint. Mike added that the Township would also be considering a pipeline 43 density ordinance, written to comply with the state constitution, at its next meeting. 44 He invited Ms. Hughes to participate in the Township's discussion with counsel on 45 the whistleblower matter.
10/20/20 October 20, 2020 2
1 2 Chairman's Report 3 Marty stated that Jon Altshul had accepted another position and would be leaving 4 the Township on November 5. He thanked Jon for his service. 5 6 He added that the Board met in Executive Session on Tuesday, October 13 at 6pm to 7 discuss a legal matter and a personnel matter and on Monday, October 19 at 10am 8 to discuss a personnel matter. 9 10 He announced that the polling locations for the November 3 General Election can be 11 found at https://www.chesco.org/DocumentCenter/View /60356/Polling-Places- 12 2020-General-Election. He noted that Precinct 7 (Bellingham retirement 13 Community) has temporarily moved to East Goshen Elementary School, 800 N 14 Chester Road, and Precinct 9 (Goshen Fire House) has temporarily moved to East 15 High School, 450 Ellis Lane. 16 17 WEGO Police Report 18 Chief Bernot reported that there were 529 calls for service in September, which is 19 up from a year ago, but that overall calls in 2020 are down due to COVID. She 20 reported that overseas criminals had recently stolen $90,000 from three seniors and 21 encouraged residents to be vigilant about potential scams. She also noted that there 22 have been a rash of thefts of political signs recently and reminded residents that the 23 penalty for stealing political signs is up to a year in prison. She stated that officers 24 would be prepared to respond to any criminal issues that arise on Election Day. 25 26 She announced that the officers had begun their annual One Warm Coat drive and 27 that new or gently used winter coats could be dropped off in the East Goshen 28 Township Building. She also stated that many officers were now participating in a 29 Bears for Charity event. 30 31 Fire Company Reports-September 2020 32 Carmen summarized the Fire Company reports for September, copies of which are 33 available on the website. 34 35 Approval of Minutes 36 David made a motion to approve the minutes of October 6, 2020, as amended. 37 Michele seconded. The motion passed 5-0. 38 39 Approval of Treasurer's Report 40 David made a motion to approve the Treasurer's Report of October 15, 2020. 41 Michele seconded. The motion passed 5-0. 42 43 Consider Business Park Task Force 44 John and David agreed to be the BOS representatives on the Task Force. 45
10/20/20 October 20, 2020 3
1 Consider Paoli Pike Trail. Segment B; PennDOT Multimodal Transportation 2 Fund Grant Application 3 Jason outlined two options for applying for a MTF grant for Segment B of the Trail, 4 one which would waive any additional matching funds and the other which would 5 commit the Township to providing $194,960 in matching funds for construction and 6 inspection. Jon noted that this amount is almost exactly what he projects as the 7 Bond Fund surplus. Jason noted that if we commit to the additional matching funds, 8 the chance of being successful in our grant application would increase and that we 9 could still apply for other grant opportunities to cover that matching requirement. 10 Marty raised concerns about the Township spending additional funds on the trail, 11 which would be contrary to what we've been telling residents, but noted that we 12 wouldn't need to spend local taxpayers dollars if we receive other grant awards. 13 14 Mike made a motion to authorize application for a PennDOT MTF Program Grant in 15 the amount of$2,805,040 and approve matching funds in the amount of$841,786, 16 including a new expenditure of $194,960. David seconded. The motion passed 3-2, 17 with Michele and John opposed. 18 19 Consider PECO Green Region Grant Program 20 David made a motion to apply for a PECO Green Region grant in the amount of 21 $10,000 for the Hershey's Mill Dam project and approve matching funds in the 22 amount of $10,000. Michele seconded. The motion passed 5-0.
23
24 Consider Tree and Street Tree Resolution 25 Rick explained that the Conservancy Board had recommended that three new tree 26 species be added to the Township's tree resolution. Michele made a motion to adopt 27 the tree species list, Resolution 2020-20, as recommended by the Conservancy 28 Board. John seconded. The motion passed 5-0. 29 30 Public Comment 31 None 32 33 Any Other Matter 34 None 35 36 Adjournment 37 There being no further business, Michele made a motion to adjourn at 9:05pm.
38 David seconded. The motion passed 5-0. 39 40 Respectfully submitted, 41 Jon Altshu/, Recording Secretary 42 43 Attached: October 15, 2020 Treasurer's Report
10/20/20 October 20, 2020 4
TREASURER'S REPORT October 1, 2020 • October 15, 2020 RECEIPTS AND BILLS
I GENERAL FUND
Real Estate Tax $5,660.21 Accounts Payable $158,742.89 Earned Income Tax $60,928.00 Electronic Pmts: Local Service Tax $4,070.85 Credit Card $0.00 Transfer Tax $81,722.69 Postage $1,075.00 General Fund Interest Earned $928.57 Debt Service $0,00 Total Other Revenue $497,346.90 Payroll $149,437.20
Total General Fund Receipts: $650,657.22 Total Expenditures: $309,255.09
lsTATE uau1D FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $10.65 Total State Liqud Fuels Receipts: $10.65 Total Expenditures: $0.00
I CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $809.39 Total Capital Reserve Fund Receipts: $809.39 Total Expenditures: $0.00
!TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 fnterest Earned $109.90 Total Transportation Fund Receipts: $109.90 Total Expenditures: $0.00
lsEWER OPERATING FUND
Receipts $9,395.13 Accounts Payable $143,741.55 Interest Earned $190.51 Electronic Pmts:
Credit Card $0.00 Debt Service $0.00 Total Sewer Operating Fund Receipts: $9,585.64 Total Expenditures: $143,741.55
!REFUSE FUND
Receipts $2,967.03 Accounts Payable $75,431.86 Interest Earned $78.73 Credit Card $0.00 Total Refuse Fund Receipts: $3,045.76 Total Expenditures: $75,431.86
IBONDFUND
Receipts $0.00 Accounts Payable $511.75 Interest Earned $187.26 Total Bond Fund Receipts: $187.26 Total Expenditures: $511.75
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $373.53 Total Sewer Capital Reserve Fund Receipts: $373.53 Total Expenditures: $0.00
I OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $468,55 1 Total Operating _Reserve Fund Receipts: $468.55 Total Expenditures: $0.00
10/20/20 October 20, 2020 5
EAST GOSHEN TOWNSHIP
MEMORANDUM
TO: BOARD OF SUPERVISORS
FROM: JON ALTSHUL
SUBJECT: PROPOSED PAYMENTS OF BILLS
DATE: NOVEMBER 5, 2020
Attached please find the Treasurer's Report for the weeks of October 15, 2020 -November 5, 2020.
The Expenditure Register also includes a $2,500 payment to Matergenics for expert testimony on the Safety 7 case. This expenditure was authorized by the Board at its August 18 meeting.
On October 27, 2020, we received an annual rebate from the PLGIT P-CARD program in the amount of $11,205.62. These funds were allocated to the General, Sewer and Refuse funds on a proportionate basis. A tip of the hat goes to Barb Phillips for managing this program and ensuring that the Township received the largest possible rebate.
Recommended motion: Mr. Chairman, I move that we graciously accept the receipts and approve the expenditures as presented in the Expenditure Register and as summarized in the
Treasurer's Report.
F:\Data\Shared Data\Finance Dept\Treasurers' Reports\2020\Nov 2020\11-5-20 Memo.docx
TREASURER'S REPORT October 15, 2020 • November 5, 2020 RECEIPTS AND BILLS
!GENERAL FUND
Real Estate Tax $4,320.32 Accounts Payable $341,947.18 Earned Income Tax $640,400.00 Electronic Pmts: Local Service Tax $6,700.00 Credit Card $2,840.26 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $756.28 Debt Service $81,384.22 Total Other Revenue $95,882.89 Payroll $194,684.49
Total General Fund Receipts: $748,059.49 Total Expenditures: $620,856.15
!STATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $6.81 Total State Liqud Fuels Receipts: $6.81 Total Expenditures: $0.00
!CAPITAL RESERVE FUND
Receipts $333,606.32 Accounts Payable $237,091.43 Interest Earned $671.19 Total Capital Reserve Fund Receipts: $334,277.51 Total Expenditures: $237,091.43
!TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $111.80 Total Transportation Fund Receipts: $111.80 Total Expenditures: $0.00
!SEWER OPERATING FUND
Receipts $319,400.35 Accounts Payable $21,412.13 Interest Earned $151.40 Electronic Pmts:
Credit Card $0.00 Debt Service $182,057.90 Total Sewer Operating Fund Receipts: $319,551.75 Total Expenditures: $203,470.03
!REFUSE FUND
Receipts $102,689.70 Accounts Payable $688.00 Interest Earned $84.35 Credit Card $0.00 Total Refuse Fund Receipts: $102,774.05 Total Expenditures: $688.00
!BOND FUND
Receipts $0.00 Accounts Payable $26,425.13 Interest Earned $140.18 Total Bond Fund Receipts: $140.18 Total Expenditures: $26,425.13
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $306.35 Total Sewer Capital Reserve Fund Receipts: $306.35 Total Expenditures: $0.00
!OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $365.07 Total Operating Reserve Fund Receipts: $365.07 Total Expenditures: $0.00
EAST GOSHEN TOWNSHIP MONTHLY DEBT PAYMENT BREAKDOWN
October 25, 2020
GENERAL FUND:
Interest Principal Year of Loan Original Remaining Retirement payment payment Issuance Description loan amount Principal Date
$5,251.02 $0.00 2003 Multi purpose $5,500,000.00 $1,462,000.00 2023 9 projects
$83.20 $0.00 2000 Spray $287,000.00 24,000.00 2021 Irrigation
$71,050.00 $5,000.00 2017 G Playground, Dams, $5,310,000.00 $5,295,000.00 2037 & Paoli Pike Trail
SEWER FUND:
Interest Principal Loan Original Remaining Retirement payment payment Description loan amount Principal Date
$19,295.10 $0.00 2008 RCSTP $9,500,000 $5,847,000.00 2032 Expansion
$4,568.42 $0.00 2013 Diversion $2,500,000 $1,798,000.00 2033 Projects
$38,194.38 $120,000.00 2017 s West Goshen STP $2,840,000 $2,585,000.00 2037
East Goshen Township Fund Accounting
Report Date 10/19/20
Vendor Req # Budget# Sub# Description
03 CAPITAL RESERVE FUND
36 MYERS L,P,, ALLAN A, 63452 l 03460 7403 PAOLI PK.TRAIL - SEGMT.C
Expenditures Register GL-2010-75990
BATCH 1 OF4
PAGE 1
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
APP,#7 10/19/20 10/19/20 10/19/20 1431 213,966.69 APP.#7 - PAOLI PK.TRAIL SEGMT.C
213,966.69
1349 TRAFFIC PLANNING & DESIGN INC, 63453 l 03460 7403 PAOLI PK.TRAIL - SEGMT.C L00380 #6 10/19/20 10/19/20 10/19/20 1432 6,756.58 PAOLI PIKE SHARED USE PATH 8/1- 8/30/20 63453 2 03460 7404 PAOLI PK.TRAIL - SEGMT,D 100380 #6 10/19/20 10/19/20 10/19/20 1432 6,756.58 PAOLI PIKE SHARED USE PATH 8/1- 8/30/20 63453 3 03460 7405 PAOLI PK.TRAIL - SEGMT.E 100380 #6 10/19/20 10/19/20 10/19/20 1432 6,756.58 PAOLI PIKE SHARED USE PATH 8/1- 8/30/20
20,269.74 ----- --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
FUND SUMMARY
Fund Bank Account Amount Description
03 03 234,236.43 CAPITAL RESERVE FUND
234,236, 43
iegend:
PERIOD SUMMARY
Period Amount
2010 234,236.43
234,236.43
lxpenditures Register Spooling to Windows Printers >rint those ready to UPDATE lorting by vendor
1rinting for GL Period 2010 laing a page break Lrchiving to EXP.enditures Register-2010, txt IARP05 run by BARBARA 9 : 59 AM
234,236.43 2 Printed, totaling 234,236.43
East Goshen Township Fund Accounting
Report Date 11/05/20
Vendor Req # Budget# Sub# Description
Expenditures Register GL-2011-76211
BATCH20F4
PAGE 1
Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
1471 WESTTOWN-EAST GOSHEN POLICE 63460 l 01410 5300 POLICE GEN.EXPENSE NOVEMBER 2020 CONTRIBUTION
110120 11/05/20 11/01/20 11/05/20 20228 p 311,838.25 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
311,838.25 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
FUND SUMMllRY
Fund Bank Account Amount Description ------- ------------ -------------- -----------------------------------
01 01 311,838.25 GENERAL FUND
311,838.25
PERIOD SUMMllRY
Period Amount
1egend:
2011 311,838.25
311,838.25
:xpenditures Register Spooling to Windows Printers
1rint those ready to UPDATE :orting by vendor 'rinting for GL Period 2011 ,oing a page break rchiving to Expenditures Register-2011.txt 11\RPOS run by BARBARA 11 : 11 AM
1 Prepaids, totaling 0 Printed, totaling
311,838.25 311,838.25 0.00
East Goshen Township Fund Accounting ' '
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH 3 OF4
PAGE 1
Ăendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
6 ABC PAPER & CHEMICAL INC 63461 1 01409 3740 TWP. BLDG. - Ml\INT & REPAIRS 109353A 11/05/20 11/05/20 28.21 AIR FRESHENER & TALL TRASH BAGS 63462 1 01454 2000 MAINTENANCE SUPPLIES 105900A 11/05/20 11/05/20 40.41 HAND SANITIZER ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
68.62
1657 AQUA PA 63464 1 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 102320 PW 11/05/20 11/05/20 206 .13 000496917 0309798 9/21-10/21/20 PW 63465 l 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 102320 TB 11/05/20 11/05/20 298. 92 000309828 0309828 9/21-10/21/20 TB 63466 l 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 102320 FR 11/05/20 11/05/20 210.36 000309820 0309820 9/21-10/21/20 FR ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
296 COMCAST 8499-10-109-0028306 63472 l 01401 3210 COMMUNICATION EXPENSE 0028306 NOVEMBER 2020 102220
715. 41
11/05/20 11/05/20 128.40 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2491 COMCAST 8499-10-109-0107472 63471 1 01401 3210 COMMUNICATION EXPENSE 0107472 10/17-11/16/20 PW TV 101020
128. 40
11/05/20 11/05/20 34.72 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3250 COMCAST 8499-10-109-0107704 63470 1 01401 3210 COMMUNICATION EXPENSE 101520 0107704 10/23-11/22/20 P&BOOT LED
3595 FETTERS INC. ,R. W. 63475 1 01438 3845 EQUIP. RENTAL -RESURFAC. BLACKTOP HAULING -TO ENTERPRISE DR, 10/10/20
101420
34. 72
11/05/20 11/05/20 108.35
108.35
11/05/20 11/05/20 855.00
855.00
ast Go,shen Township Fund Accounting
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH3 OF4
PAGE 2
ęendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# l\mount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4137 FIRSTNET - #281290608802 63474 1 01401 3210 COMMUNICATION EXPENSE SEPTEMBER 2020
802X10082020 11/05/20 11/05/20 619.04 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3131 GREAT AMERICA FINANCIAL SERVICES 63476 l 01401 3840 RENTAL OF EQUIP. -OFFICE 27987479 OCTOBER 2020 LANIER MP C6004ex
619.04
11/05/20 11/05/20 160.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2717 HIGGINS & SONS INC., CHARIES A. 63478 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF,LIGHT REPAIR - BOOT & WILSON 63479 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT REPAIR - AIRPORT & PAOLI
638 HOME DEPOT CREDIT SERVICES 63480 1 01430 2330 VEHICLE MAINT AND REPAIR TURBO BLADES ·TRUCK #8 & 1 63480 2 01431 2460 GENERAL EXPENSE - SHOP DREMEL TOOL & TARP 63480 3 01437 2600 SHOP - TOOLS DRILL DRIVER KIT AND BITS 63480 4 01438 2450 MATERIALS & SUPPLIES-HIGHWJIYS MAILBOX & POST - REPLACEMENT DUE TO DROPPED LIMB ON RESIDENTS MAILBOX 63480 5 01454 3740 EQUIPMENT MAINT. & REPAIR LUMBER 5/4"X6' - TRAIL BENCHES
52726 11/05/20
52728 11/05/20
101320 11/05/20
101320 11/05/20
101320 11/05/20
101320 11/05/20
101320 11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
160,00
276.00
65.00
341.00
24.91
226.00
221.41
52.45
36.81 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
561. 64
2707 HOSKIN'S FORD, BRIAN 63481 l 01430 2330 VEHICLE MAINT AND REPAIR 157280 11/05/20 11/05/20 395.19 ---------------===-=-:-= -!"#$%=- tk _ ? ----------- -------- --------- --------- ------ ------------
395.19
3990 LANGS LAWNCARE & TREECARE 63482 1 01454 3723 BALL FIELDS 314313 11/05/20 11/05/20 135.00 LAWN SERVICE - FIELD A 63483 1 01454 3723 BALL FIELDS 314311 11/05/20 11/05/20 170.00 LAWN SERVICE - FIELD B 63484 1 01454 3123 BALL FIELDS 314312 11/05/20 11/05/20 209.00 LAWN SERVICE - FIELD C ·----- --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------ 514.00
ast Gshen Township Fund Accounting
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH30F4
PAGE 3
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
01 GENERAL FUND
765 LEC - LENN! ELECTRIC CORPORATION 63486 l 01409 3745 PW BUILDING - MAINT REPAIRS 200941 WELDER OUTLET IN MECHANIC'S BAY
ll/05/20 ll/05/20 203.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4391 MATERGENICS INC. 63488 l 01401 3000 GENERAL EXPENSE FLYNN CASE REVIEW OF DOCUMENTS
2586
203.00
ll/05/20 ll/05/20 2,500.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
3548 OFFICE BASICS 63492 1 01401 2100 MATERIALS & SUPPLIES PRINTER CARTRIDGES & USB DRIVES
2,500.00
I-581201 11/05/20 ll/05/20 227.84 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1554 OFFICE DEPOT 63493 l 01401 2100 MATERIALS & SUPPLIES HP TONER
129882918001 11/05/20
227.84
11/05/20 184.36 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
4037 PATTON, ETHAN 63494 1 01438 3845 EQUIP. RENTAL -RESURFAC. TRUCK RENTAL & HAULING - GOSHEN CORP. PARK
20.80
184.36
ll/05/20 ll/05/20 1,025.00
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1555 PECO - 45168-01609 63497 1 01409 3840 DISTRICT COURT EXPENSES 45168-01609 9/17-10/19/20 DC-GAS 63497 2 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 45168-01609 9/17-10/19/20 PW-ELEC.
102120 ll/05/20
102120 ll/05/20
ll/05/20
ll/05/20
1,025.00
273.09
576.42 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2592 PECO - 45951-30004 63496 1 01454 3600 UTILITIES 101920 45951-30004 9/17-10/16/20 RESTROOMS
849.51
ll/05/20 11/05/20 35.91
35.91
East Goshen Township Fund Accounting
' '
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH3 OF4
PAGE 4
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
2591 PECO - 59500-35010 63495 1 01454 3600 UTILITIES 102320 59500-35010 9/22-10/22/20 POND PUMP
1201 SAFETY SOLUTIONS INC.
3834
63498 1 01437 2460 GENERAL EXPENSE - SHOP 20 BOXES OF FACE MASKS
STANDl\RD INSURANCE CO., THE 63499 1 01486 1560 BEALTH,ACCID. & LIFE NOVEMBER 2020 PREMIUM 63499 2 01213 1010 VOL. LIFE INSURANCE W/H NOVEMBER 2020 PREMIUM
1297 STAPLES CREDIT PLAN
1324
1470
63500 1 01401 2100 MATERIALS & SUPPLIES
63501 1
63502 1
63503 1
63503 2
BATTERIES, SECURITY ENVELOPES, HP BLACK, MAGENTA & CYAN TONER
T&G WINDOW CLEANING 01409 3840 DISTRICT COURT EXPENSES OCTOBER WINDOW CLEANING - DC 01409 3740 TWP. BLDG. - MAINT & REPAIRS OCTOBER WINDOW CLEANING - TWP
WESTTOWN TOWNSHIP 01410 5310 REGIONAL POLICE BLDG INTEREST NOVEMBER 2020 - INTEREST 01410 5320 REGIONAL POLICE BLDG PRINCIPAL NOVEMBER 2020 - INTEREST
52405
102020
102020
100920
499612
499611
110520
110520
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
11/05/20
35,27
35.27
600.00
600.00
3,682.24
143,91
3,826,15
229.92
229. 92
150.00
1,000,00
1,150.00
837.29
9,583.33
10,420,62
ast Gshen Township Fund Accounting
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH3 OF4
PAGE 5
Vendor Req # Budget# Suh# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
03 CAPITAL RESERVE FUND
3551 MCMAHON ASSOCIATES INC. 63491 l 03460 7406 PAOLI PK.TRAIL - SEGMT.F 173677 PROF.SERVICE 10/29-10/2/20 SEGMT F 63491 2 03460 7407 PAOLI PK.TRAIL - SEGMT.G 173677 PROF.SERVICE 10/29-10/2/20 SEGMT F
11/05/20
11/05/20
11/05/20
11/05/20
1,427.50
1,427.50
2,855.00
East Go,shen Township Fund Accounting
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH30F4
PAGE 6
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
05 SEWER OPERATING
40 ALLIED CONTROL SERVICES 63463 l 05420 3700 C.C. METERS-MAINT.& REPRS. PROVIDE REPLACEMENT HMI
314893 11/05/20 11/05/20 1,935.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
2914 BIG FISH ENVIRONMENTAL SERVICES INC. 63467 l 05422 4500 R.C. STP-CONTRACTED SERV. 20-1032 SERVICES RE: RCSTP OCTOBER 2020
11/05/20
1,935.00
11/05/20 13,882.15 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
151 BLOSENSKI DISPOSAL CO, CHARLES 63468 l 05422 4502 R.C. SLUDGE-LAND CHESTER SWITCH 20YDS WITH LINER 10/12/20 63469 1 05422 4502 R.C. SLUDGE-LAND CHESTER SWITCH 20YDS WITH LINER 10/5/20
185392 11/05/20 11/05/20
185381 11/05/20 11/05/20
13,882.15
186.00
186.00 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
1747 EAST WHITELAND TOWNSHIP 63473 1 05429 4520 CONTR. SERV, MALVERN INSTITUTE QTR,3 2020 SEWER
583 HACH COMPANY 63477 1 05422 3700 R.C. STP-MAINT.& REPAIRS PHOSPHORUS & NITRITE TNT, DEIONIZED
372. 00
101220 11/05/20 11/05/20 2,535.80
2,535.80
12155024 11/05/20 11/05/20 1,836.56
WATER, SULFURIC ACID & FILTER PAPER I L 5 1 · ·----- --------- ------- ---- ----------------------------------- - 3""------"ff tS,5 --- --------- --------- ------ ------------ 1, 836. 56
765 LEC - LENNI ELECTRIC CORPORATION 63485 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 200943 REPLACE LEDS - HERSHEY MILL STATION
11/05/20 11/05/20 162. 62
East Goi;hen Township Fund Accounting
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH30F4
PAGE 7
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
07 MUNICIPAL AUTHORITY
765 LEC - LENNI ELECTRIC CORPORATION 63487 1 07429 1503 HERSHEYS MILL PUMP STATION CAPITAL 201001 DISCONNECT GENERATOR, DEMO ATS &
11/05/20 11/05/20 6,876.50
_______________ _______ ____ BATTERY_ CHARGER,_ INSTALL_ NEW WIRING _N, <-'-' _ c.","'..,_..,J0r c.,.,.. ,f k-/-(,.,n__ ______ ___________ _
7,039.12
at Gqshen Township Fund Accounting
Report Date 11/05/20 Expenditures Register GL-2011-76214
BATCH30F4
PAGE ll
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# J\mount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
08 BOND FUNDS (CAPITAL PROJECTS)
3551 MCMAHON ASSOCIATES INC. 63489 1 08459 6001 SEGMENTS A&B ENGINEERING 173646 PROF.SERVICE 8/29-10/02/20 SEG.A&B 63490 1 08459 6003 SEGMENT C ENGINEERING 173689 PROF.SERVICE 8/29-10/02/20 C,D & E CONSTRUCTION
11/05/20
11/05/20
11/05/20
11/05/20
13,126.68
13,298.45
------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
26,425.13 ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------
FUND SUMMARY
Fund Bank Account Amount Description ------- ------------ -------------- -----------------------------------
01 01 03 03 05 05 07 07 08 08
25,788.95 GENERAI FUND 2,855.00 CAPITAL RESERVE FUND 20,724.13 SEWER OPERATING 6,876.50 MUNICIPAL AUTHORITY 26,425.13 BOND FUNDS (CAPITAL PROJECTS)
82,669.71
PERIOD SUMMARY
Period Amount
2011 82,669.71
82,669.71
1egend: :xpenditures Register Spooling to Windows Printers
1rint those ready to pay :orting by vendor
1rinting for GL Period 2011
1oing a page break 'reating a CSV File rchiving to Expenditures Register-2011.txt MJ>05 run by BARBARA 2 : 24 PM
82,669.71 0 Printed, totaling 82,669.71
East Goshen Township Fund Accounting
Report Date 11/05/20
MI\RP17 run by BARBARA
Per Budget I Sub#
Procurement Card Entries
3 : 34 PM
Description Vendr
2011 CREDIT CARD PAYMENT
PAGE 1
Vendor Name
01401 3400 NOTICE - WEST CHESTER COG MEETING 2226 21ST CENT.MEDIA NEWS 1884433 01438 2450 PORTABLE TOILETS-CONSTRUCTION 9/30 3140 ACE PORTABLES INC, 01430 2320 680 GI\LS, DIESEL 1161 REILLY & SONS INC 01430 2320 198,4 GI\LS,GASOLINE 1161 REILLY & SONS INC 01430 2320 138,2 GI\LS, GASOLINE 1161 REILLY & SONS INC 01430 2320 550,9 GI\LS, DIESEL 1161 REILLY & SONS INC 01409 3840 10/16/20 - 11/15/20 2868 VERIZON-1420 01409 3605 10/15/20 - 11/14/20 2273 VERIZON - 0527
GENERI\L LEDGER SUMMI\RY
GL Account I
014XlHOOIX 01101-1010
Debit
2,840,26
Credit Description
GENERAL FUND Expense Account 2,840,26 GENERI\L FUND Bank Account
BATCH40F4
Invoice I Inv Date Credit Srce Trx I I U
2074380 10/09/20 71,08 PC 76219 1 166716 09/01/20 110,00 PC 76219 2 193393 531 10/01/20 991,56 PC 16219 3 193392 530 10/01/20 313, 67 PC 76219 4 193616 530 10/14/20 221.95 PC 16219 5 193671 531 10/14/20 828, 55 PC 16219 6 1504490-101520 10/15/20 85,29 PC 16219 7 1504491-101420 10/15/20 212, 16 PC 16219 8
2,840,26
2,840.26
PLGIT 1107 .1010
D"
RICK SMITH
8/30/2020 Zoom - Virtual Meetings 8/30-9/29/20
9/7/2020 Apple.com - I-Cloud
9/11/2020 Amazon - Webcam Camera
9/12/2020 Amazon - Webcam shutter & tyvek envelopes
9/16/2020 Amazon - Refund for Webcam shutter
9/20/2020 Amazon - Ethernet Switch
9/24/2020 Apple.com - I-Cloud
$308.45 MARK MILLER
9/1/20 Robert's Oxygen- deposit for mig welder 9/3/20 Pep Boys - supplies for wash bay 9/17/20 Vanos Pizza - pizza for PW Paving 9/21/20 Walpole Outdoors - Replace damaged mailbox (sweeper accident)
9/21/20 Moultrie Mobile - Park cameras
9/24/20 Briar Rose Greenhouse - Mums for township bldg.
9/24/20 Steeltoeshoes.com - Steel toe shoes - Billy Minahan
$3,655.31 JASON LANG
9/11/20 Amazon - Leathercraft Gardening Gloves 9/14/20 USPS - Supplies for Team Film Showcase 9/24/20 Giant - Snacks for Lego Camp
·$76.06 GRAND TOTAL
J/E's made
Add to Master Cred.Card List
ATTACHMENT 1 OF 2
TOTAL 1116.1000 1401.2100 1401.3210 1407.2130 1409.3740 1430.2330 3430.7400
29.98 29.98 0.99 0.99
148.85 148.85 46.12 37.73 8.39
-8.39 -8.39
89.91 89.91
0.99 0.99
2,500.00 2,500.00 263.60 263.60 120.00 484.59 42.38 69.00 69.00
175.74 I
33.28 24.56 18.22
I
4,039.821 2,500.001 37.731 29.981 240.741 69.001 263.601 EE
I $ 2,500.00 103 to reimburse 01 for 03 Credit Card pense
11/10/2020
40 a•n
120.00 484.59 I I I 42.38
I I I I 175.741 I l l l J
I 33.28 I 24.56 18.22
604.591 18.221 57.841 42.381 175.74
4,039.82
X
ACH DEBITS TO GENERAL FUNDS EXPENSE REPORT Attachment 2 OF 2
Meeting Date 11/10/2020
10/1/20 - 10/31/20
01 Amount
Charged Date Name Description GENERAL
FUND $30.30 10/22/2020 AUTHNET FEES September 2020 CRED.CARD BANK CHARGES $249.86 10/22/2020 BANKCARD FEES September 2020 CRED.CARD BANK CHARGES
280.16
05
SEWER $3SO.OO 10/5/2020 REIMBURSMENT of BANK FEE September 2020 LOCK BOX FEE
FUND $338.00 10/27/2020 REIMBURSMENT of Credit Card Fee September 2020 Paymentus 688.00
06
REFUSE $350.00 10/5/2020 REIMBURSMENT BANK FEE September 2020 LOCK BOX FEE
FUND $338.00 10/27/2020 REIMBURSMENT of Credit Card Fee September 2020 Paymentus 688.00
$ 1,656.16
U:\BPhillips\EXPENSE REPT. ATTACH\EXPENSE REPORT 11-10-20.xlsx
Memo
Date: To:
From: Re:
November 5, 2020 Board of Supervisors Rick Smith, Township Manager Business Park Task Force
At your meeting on October 20 the Board agreed to have David and John serve on the Business Park Task Force.
I reached out to the Planning Commission and Futurist Committee and the following individuals would be willing to serve on the Task Force.
John Stipe, Ed Decker and Mike Koza will represent the Planning Commission; and Brian Sweet
and Jeff O'Donnell will represent the Futurist Committee.
Attached is the resolution creating the Business Park Task Force.
You need two motions.
Motion 1- I move that we adopt the Resolution creating the Business Park Task Force.
Motion 2 - I move that we appoint the following individuals to serve on the Business Park Task Force
David Shuey
John Hertzog
John Stipe
Ed Decker
Mike Koza
Brian Sweet
Jeff O'Donnell
F:\Data\Shared Data\Admin Dept\Township Code\2020 Zoning Ordinance Review\BP and I Districts\Memo 110220.docx
EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA
RESOLUTION 2020 -_
A RESOLUTION ESTABLISHING THE EAST GOSHEN TOWNSHIP BUSINESS PARK TASK FORCE, SETTING FORTH ITS OBJECTIVE
AND ESTABLISHING THE MEMBERSHIP THEREOF, AND PROVIDING FOR THE ORGANIZATION AND MEETINGS OF THE
TASK FORCE
WHEREAS, the Township of East Goshen in Ches.ter County, Pennsylvania, is a Township of the
Second Class; and
WHEREAS, the 2015 East Goshen Township Comprehensive Plan sets forth a number of
objectives; and
WHEREAS, Economic Development Strategy, Objective 7.3 reads as follows: "Allowing for new uses and smaller incubator business in the corporate parks and the industrial park;" and
WHEREAS, for the foregoing reasons the Board of Supervisors of East Goshen Township has determined it to be appropriate to establish a Business Park Task Force to provide guidance to the Board of Supervisors on how to achieve this Objective.
NOW THEREFORE BE IT HEREBY RESOLVED that the Board of Supervisors hereby establishes a Business Park Task Force:
Section 1. Name The name of the body hereby established shall be the "East Goshen Township Business Park Task Force."
Section 2. Objectives The Business Park Task Force has the following objectives:
• Assess cunent revenue to the Township from the business parks. • Create a document that is updated regularly with key information on each business. • Assess the future outlook of the employment levels of each business in the business parks. • Evaluate the permitted uses in the II and BP Districts. • Create an action plan to address any concerns.
Section 3. Membership The Business Park Task Force shall be composed of seven persons consisting of two Supervisors, three representatives from the Planning Commission and two representatives from the Futurist Committee, all of whom shall be appointed by and serve at the discretion of the Board of Supervisors.
Section 4. Compensation Members of the Business Park Task Force shall receive no compensation for their services.
Section 5. Organization The members of the Business Park Task Force shall elect their own Chairman and Vice Chair.
1
Section 6. Meetings Regular public meetings shall be held to conduct the business of the Business Park Task Force. The Business Park Task Force shall keep records of its meetings and shall make a final rep01t to the Board of Supervisors upon completion of their objectives.
Section 7. Funding The Business Park Task Force, with the consent of the Board of Supervisors, may utilize any funds, personnel, or other assistance made available by Chester County, the Commonwealth of Pennsylvania, or the Federal Government; or any agencies of the County, State, or Federal Government; or funds made available from any other private or public sources. The Board of Supervisors may enter into agreements or contracts regarding the acceptance or utilization of such funds or other assistance as may be available.
Funds for the expenses to be incmTed by the Business Park Task Force must be approved and appropriated by the Board of Supervisors.
Section 8. Sunset Provision
The Business Park Task Force shall terminate upon the acceptance of its final report by the Board of Supervisors, unless the Board directs otherwise.
Section 9. Effective Date
This resolution shall talce effect five days after adoption and upon appointment by the Board of Supervisors of at least fom members of the Business Park Task Force.
ADOPTED, this ---Òday of ______ 2020.
ATTEST:
Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
\\2016serv\apps\Data\Shared Data\ABC'S\Business Park Task Force\Rcsolution 110420.docx
2
)
<'02P"""'- "'lo/A11'15:%11f$@¾//%'!l
1';+1?-" , , ' Respecti1Jg ;h'; a; Bfl' · Serving the Rresent' a-' P1·epctri11g}p1· the E11tw:e
,,;,,,i-f,'#',)'/:,a!'/WJ0it&4s!Y.d!Mi--"<,ili """.,;_il
November 5, 2020
Dear Residents, Business Owners and the Board of Supervisors of East Goshen Township:
We are pleased to present East Goshen Township's 2021 Proposed Budget. This budget reflects the Township's three co-equal missions of respecting the past, serving the present and preparing for the future to ensure that East Goshen remains the premier municipality in which to live, work and play in
Chester County.
Importantly, we are proposing to maintain tax rates at the existing level of 1.25 mills for the 18th
consecutive year. However, there is no question that 2021 will be a challenging budget year. This proposed budget requires a transfer from fund balance of $810,760, an increase of $349,199 over the 2020 Adopted Budget, and $561,876 over the 2020 Year-End Projection in order to be in balance, or approximately 10% of the available operating reserve fund and general fund balances. While the Township has ample reserves that will delay the need for tax increases in the short-to-medium term, there is no question that over the next decade, the Township will need to take proactive steps to either further control expenses or increase revenue to ensure that East Goshen retains its prized AAA credit rating and has access to capital markets at the lowest possible interest rates.
Roughly 39% of the deficit is due to one-time deferrals from 2020. While the 2021 deficit is significant, a substantial portion of the shortfall can be explained by $318,400 in expenditures that the Township had originally planned to undertake in 2020 that were deferred until 2021 due to the on-going COVID crisis. These deferrals include the dredging and rehabilitation of Bow Tree Pond I, the plantings around Marydel/ Pond, and repaving Eastwick Circle, Great Oak Circle and Killern Lane.
This budget is extremely lean. The budget eliminates a number of discretionary expenditures, including the ABC holiday party, paper newsletters and road-side litter pick-up. The proposed budget also calls for aggressive draws down on existing surpluses in the Capital Reserve Fund and the Police Pension Trust in
order to control the deficit. Moreover, the revenue side of the ledger reflects conservative projections for taxes on account of the on-going economic slowdown. In particular, Earned Income Tax and Real Estate Property Tax are essentially unchanged from their 2020 Year-End Projections, while Cable Franchise Fee, Interest Income and Local Services Tax are expected to fall on account of changing economic realities.
This proposed budget reflects the Township's continued commitment to public safety. In particular, the budget reflects the 2020 Act 111 Arbitration Award for the police officers, and a $29,624 increase in funding for the Goshen Fire Company, as part of a two-year multi-municipal initiative to increase Goshen's funding level by approximately $276,000 by 2022.
l
Click here to view the power point.
This proposed budget reflects a commitment to pro-actively maintaining aging infrastructure to avoid more costly repairs in the future. $200,400 is budgeted to dredge and rehabilitate the Bow Tree I pond on Bow Tree Drive, as the second pond to be rehabilitated, after Marydel! Pond, as part of a multi-year effort to ensure that the Township's ponds remain viable recreation areas for generations to come. In addition, on the sewer fund/Municipal Authority side of the ledger, $130,000 is budgeted to continue relining brick manholes and asbestos cement sanitary sewer lines for the fifth straight year.
This proposed budget reflects the Township's continued commitment to ensuring that the Township has the recreational infrastructure to attract the next generation of homeowners. Specifically, the budget reflects the completion of both the Hershey's Mill Dam Park and Milltown Dam Park in 2021, while looking forward to the completion of the Paoli Pike Trail in 2022 and beyond.
Finally, this proposed budget is realistic and conservative in balancing the need to provide critical municipal services within prudent fiscal constraints. As noted above, no real estate tax increase is
proposed for the 18th consecutive year.
Pursuant to Section 3202 of the Second Class Township Code, the Board may adopt the budget no earlier than 20 days after the proposed budget has been advertised in a newspaper of general circulation, which we expect to occur on November 11th, the day after the proposed budget is presented at the November 10th Board of Supervisors meeting. Therefore, the Board of Supervisors is scheduled to adopt the budget on the evening of December 1st• State law limits how much the budget can be change between the time it is advertised and it is adopted to "no more than ten percent in the aggregate or more than 25 percent in any major category."
In the meantime, staff welcomes feedback from all residents and business owners on the proposed budget. After all, these proposed expenditures are made with your tax dollars and fees. Everyone in East
Goshen is an important stakeholder in this critical democratic process!
Louis F. Smith Township Manager
Sincerely,
Jo-vv
Jon Altshul Assistant Township Manager & Finance Director
2
r•
Rick Smith
From: Sent: To: Subject:
-----Orig in al Message-----
mlynch@eastgoshen.org Saturday, October 24, 2020 6:39 PM
Rick Smith Mikel FW: RE: Please Ask Your State Legislators to Pass HB 531 and Help Boost Pennsylvania's Economy and Jobs
From: "mlynch@eastgoshen.org" <mlynch@eastgoshen.org> Sent: Saturday, October 24, 2020 6:38pm To: "Mary Ann Kusner" Cc: "David Shuey" <dsnuey eas gos en.org> Subject: RE: Please Ask Your State Legislators to Pass HB 531 and Help Boost Pennsylvania's Economy and Jobs
Thanks Mary Ann; I'm in. By cc to Rick Smith Township Manager I will ask him to review the pending legislation and add it to our next agenda for consideration by the Board. With Appreciation,
Mikel -----Original Message---- From: "Mary Ann Kusner" Sent: Friday, October 23, 2020 8: 19pm To: "Mr. Michael Lynch" <mlynch@eastgoshen.org>
Subject: Please Ask Your State Legislators to Pass HB 531 and Help Boost Pennsylvania's Economy and Jobs
Dear Mr. Lynch,
Community solar offers an incredible opportunity to provide an immediate boost to jobs and the economy when we need it the most. House Bill 531 would allow equal access to renewable energy to renters, those in multi-tenant buildings, and businesses and homeowners with roofs that are not
suitable for installing solar panels. Community solar will create good-paying jobs for Pennsylvania residents, save consumers money on energy bills, pay farmers for allowing solar projects on their land, and generate much-needed tax revenue for municipalities without raising any taxes. As your constituent, I need you to urge our state legislators to pass HB 531.
Community solar has widespread support from key stakeholders across Pennsylvania. HB 531 has a Republican prime sponsor and 93 bipartisan cosponsors. It is championed by the Pennsylvania Farm Bureau, labor unions, and solar energy developers. A recent poll showed over 80% of Pennsylvanians support community solar, with equally strong support from rural and suburban voters. Eight in ten Pennsylvania voters said they want more choices for their electricity, and over 60% said they would consider subscribing to a community solar project if it was possible. The survey found bipartisan support for community solar, including 68% of Republicans and almost 80% of
Independents.
There are over 200 shovel-ready community solar projects in over 40 counties that are ready to go once this legislation passes. Using a National Renewable Energy Laboratory model, Vote Solar
1
' ' estimated that developing 1.5 gigawatts (GW) of new community solar in Pennsylvania could result in significant economic development growth, including:
3,159 sustained full-time jobs during construction in the first five years (a 75% increase).
$2.08B in local economic benefits with an additional $210 million in property tax revenues paid for by developers of community solar projects.
$1.06B in earnings for those employed during construction activities.
Please contact your state senator and representative to ask them to advance HB 531 so that Pennsylvania can take advantage of the many economic benefits of community solar during these difficult times. Thank you.
Sincerely, Mary Ann Kusner 1026 Kennett Way West Chester, PA 19380
2
Memo East Goshen Township
Date: November 5, 2020 To: Board of Supervisors From: Rick Smith, Township Manager Re: Community Solar Legislation
Most if not all of the Supervisors have received emails requesting that the Board contact their state legislators and ask to support HB 531 (Printer's No. 573). House Bill 531 is currently in the Committee on Consumer Affairs. There was a hearing on this bill in September, however there have been no votes on the bill to date. Representative Comitta is a sponsor of this bill, so we definitely have her support.
The companion legislation in the Senate is SB 705 (Printers No. 938), which is in the Consumer Protection and Professional Licensure Committee. Senator Killian is a sponsor of this bill, so we can assume that we have his support and he is Vice Chair of the Committee.
In order for the legislation to become law, both bills would need to get voted out of committee and get to the floor for a vote, before this legislative session ends.
I spoke to representatives from Senator Killian's and Representative Comitta's office who opined that it was unlikely that this legislation would pass this year, unless it was included in some sort of omnibus bill.
F:\Data\Shared Data\Admin Dept\legislation\HB 531110520.docx 1
ON LINE MESSENGER SERVICE
t: I\.)\ Ga.! lfe)0 --n.,ue _ ( 5 &0 P Aot i " \ \<Q_,
\>Jes, C\t\e;) ff)
e AUTO TAGS e NOTARY PUBLIC
610-692-5641 FAX 692-5724
1301 WEST CHESTER PIKE, WEST CHESTER, PA HOURS:. DAILY 9:00 TO 9:00 SAT. 9:00 TO 5:00
=r. wvocD L, ,l.e· ?e#M.\..S.S I ow -b Se.-\ l C.h1s.011 t4s ,ree . .!)
T" \\ wesr C.heJ+e< .P,l Lve.1-r C e.)-\-i=< P0
By 'Ko- C tJfG610J
To: Board of Supervisors
Christmas Tree sales are permitted in the C-1 District with the Board's approval. Below is the standard letter we have issued in past years.
Rick
November 11, 2020
Mr. Robert C. Wiggins 1301 West Chester Pike West Chester, PA 19382
Re: Christmas Tree Sales
Dear Bob:
Please be advised that at their meeting on Tuesday, November 10, 2020 the Board of Supervisors approved your request for permission to sell Christmas trees on your property at 1301 West Chester Pike, provided adequate off-street parking is provided and clean-up takes place immediately after Christmas. All signs must also be removed at that time.
Please give me a call at 610-692-7171 or email me at rsmith@eastgoshen.org if you have
any questions or need additional information.
Sincerely,
Louis F. Smith, Jr. Township Manager
F:\Data\Shared Data\Prope1ty Management\53-6\53-6-65 (Ellis Lane)\Chrislmas Tree Sales 111120.doc
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 10/27/2020 To: Board of Supervisors . fl From: Mark Gordon, Township Zoning Officer IU{KI Re: Proposal for Construction Services/ Segment A of the Paoli Pike Trail
Dear Board Members,
McMahon Associates has completed construction plans for Seg. A of the Paoli Pike Trail
(Airport Rd. to Ellis Ln.) and is prepared to submit them to PennDOT so the project can be advertised for bids.
Since this is a Penn DOT project using federal funds for construction, an approved
Penn DOT inspector is required for the project. McMahon Associates Inc. has prepared us the attached Proposal for Construction Services for the project.
Staff recommends using McMahon to provide these services since they are the design engineer for the project and they are intimately familiar with the project and Penn DOT procedures and processes.
Draft Motion: Mr. Chairman, I move that the Board of Supervisors authorize the Chairman to sign the Proposal for Construction Services from McMahon Associates Inc. for the Construction of Segment A of the Paoli Pike Trail.
F:\Data\Shared Data\Paoli Pike Trail\Segment A\Memo to BOS re. Cl Agreement for Seg A. 10272020.doc
MCMAHON
TRANSPORTATION E NGINEERS & PLANNERS
August 10, 2020
Mr. Louis (Rick) Smith, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
RE: Proposal for Construction Services Paoli Pike Trail - Segments A Project East Goshen Township, Chester County, PA McMahon Project No. 820649.2P
Dear Mr. Smith:
McMAHON ASSOCIATES, INC.
835 Springdale Drive, Suite 200 E!xton, PA 19341 p 610-594-9995 I f 610-594-9565
PRINCIPALS Joseph J. DeSantis, P.E., PTOE
John S. DePalma Casey A. Moore, P.E. Gary R. McNaughton, P.E., PTOE
Christopher J. Williams, P.E.
ASSOCIATES John J. Mitchell, P.E. R. Trent Ebersole, P.E. Matthew M. Kozsuch, P.E. Maureen Chlebek, P.E., PTOE
Dean A. Carr, P.E. Jason T. Adams, P.E!., PTOE Christopher K. Bauer, P.E., PTOE
FOUNDER Joseph W. McMahon, P.E.
McMahon Associates, Inc. is pleased to submit this proposal to provide engineering services during the construction of the above referenced project. As a result of the TA Set-Aside federal funding, the construction administration and construction inspection will have to follow PennDOT standards. McMahon will utilize Mr. Sean Hughes, Lead Inspector-In-Charge and Khasiem Sledge, Transportation Construction Inspector who are qualified construction professionals and has all of the required PennDOT certifications. Mr. Hughes will be the Lead Inspector-In-Charge and will have oversight from Mr. Seyi Akinlotan, County FAM Coordinator for PennDOT District 6-0 and will keep the Township's staff informed about the status of construction.
Scope of Services
Task 1- Construction Administration
McMahon anticipates a duration of construction of 12weeks. McMahon will attend the pre-construction meeting at the District office once the project is awarded. All project submittals related to shop drawings and materials will be reviewed and approved by McMahon. The review and acceptance of the shop drawings and other project submittals such as RFI' s will be coordinated within the PennDOT PPCC ( aka Sharepoint system, etc). During the construction period, McMahon will review and approve material quantity measurements submitted by the contractor and process payment applications submitted by the contractor on the project. All payment applications, additional work authorizations and work orders must go through PennDOT's Engineering and Construction Management System (ECMS). As Lead Inspector-In-Charge, McMahon will ensure compliance with the labor standards provisions of the contract and the related wage determination decisions of the Secretary of Labor and the equal
Engineering I Planning I Design I Technology mcmahonassoclates.com
Mr. Louis (Rick) Smith, Township Manager August I 0, 2020 Page 2 of3
opportunity provisions of the construction contract, particularly Section II of the Required Contract Provisions and the EEO and MBE/WBE/DBE special provisions. Progress meetings will be conducted and meeting minutes will be prepared and distributed. PennDOT has several groups of auditors routinely checking the project documentation, job management and material reviews. They typically come to the project site two or more times during construction. McMahon will coordinate with all PennDOT audits to properly close out the project.
Task 2 - Construction Inspection
McMahon will provide full time inspection during construction. The Transportation Construction Inspector will be responsible for the following:
1) Day-to-day on-site construction inspection; 2) Daily Project Site Activity reports, including entry into PennDOT ECMS system; 3) Material certification & delivery ticket collection and organization; 4) Oversight of any unforeseen daily force account work and associated documentation; 5) Attendance at progress meetings.
McMahon's Lead Inspector-In-Charge will review and accept the Daily Project Site Activity reports. Copies of all project documentation will be emailed to the Township during construction and finalized at the completion of the project. We anticipate that our Transportation Construction Inspector will be on site for an average of thirty (30) hours per week for an estimated 360 hours during construction. Our office will contact you when we are at 75% of the budgeted hours to determine if additional will need to be authorized by the Township.
Schedule - We are prepared to initiate work on this project upon receipt of written authorization to proceed and the contractor's notice to proceed which is anticipated for early 2021.
Fee - Based on the scope of services described above, our fee for the above tasks is as follows:
Task 1- Construction Administration Task 2 - Construction Inspection
TOTAL
$12,680 $42,200
$ 54,880 (Not to Exceed)
This fee is exclusive of all expenses such as reproduction, plotting, graphics, and personal automobile usage. The services to be performed pursuant to this agreement are strictly limited to those expressly set forth herein. No additional services will be provided unless requested and agreed to in writing. Supplemental services not specifically described above, including but not limited to major engineering re-design, environmental studies and permitting, materials testing and construction stakeout are not
Mr. Louis (Rick) Smith, Township Manager August I 0, 2020 Page 3 of 3
included in the scope of this proposal, but will be provided, as necessary and as authorized, on a time and-materials basis. Please refer to our agreed upon Provisions for Professional Services.
Conditions
The conditions of this agreement call for the execution of this contract with the understanding that invoices for services will be submitted monthly and are payable within 30 days of issuance. All projects with overdue invoices exceeding 60 days will be subject to a stoppage of all work Any changes in the specific work program described above will result in an adjustment of the conditions and fees. If the terms of this contract, as contained herein, and in the attached Standard Provisions for Professional Services are agreeable to you, please execute one copy of the agreement below in the space provided and return the signed copy to me. If you should have any questions, or require further information, please feel free to contact me at 610.594.9995, ext. 5129. We appreciate the opportunity to continue serving East Goshen Township on this project.
Sincerely,
Stephen C. Giampaolo, P.E. Senior Project Manager
SCG/
Accepted for East Goshen Township by:
I have reviewed all terms of this contract, and I am authorized to sign in the space below for execution of this contract.
By:
(Signature of Authorized Representative)
(Printed Name of Authorized Representative)
Title:
Date:
I:\ eng\ 816417\ Correspondence \Proposals \Segment A Proposal\ Paoli Pike Trail_Segment A_ Construction Proposal_8_2020.docx
MCMAHON ASSOCIATES, INC. STANDARD PROVISIONS FOR PROFESSIONAL SERVICES
2020
SERVICES McMahon Associates, Inc. reserves the right to make adjustments for individuals within these classifications as may be desirable in its opinion by reason of promotion, demotion, or change in wage rates. Such adjustments will be limited to the manner in which charges are computed and billed and will not, unless so stated in writing, affect other terms of an agreement, such as estimated total cost. The following rates will apply to actual time devoted by McMahon Associates, Inc. staff to this project computed to the nearest one-half hour.
TERMS
PERSONNEL Senior Project Manager
Project Manager/Survey Manager
Senior Project Engineer
Project Engineer
Staff Engineer/Survey Party Chief
Technician/Admin/Survey Tech
Field Personnel
HOURLY RATES
$175
$155
$135
$120
$100
$80
$50
1. Invoices - Invoices will be provided on a monthly basis and will be based upon percentage of completion or actual hours, plus expenses. Payment is due to McMahon Associates, Inc. within 30 days of the invoice date. Unpaid balances beyond 30 days are subject to interest at the rate of 1.5% per month. This is an annual percentage rate of 18%.
2. Rates -Principal and Associate time will be billed at a rate of $195 per hour, when involvement is requested by the client, or project needs dictate. The above billing rates are for invoices payable by the municipality.
3. Confidentiality -Technical and pricing information in this proposal is the confidential and proprietary property of McMahon Associates, Inc. and is not to be disclosed or made available to third parties without the written consent of McMahon Associates, Inc.
4. Commitments - Fee and schedule commitments will be subject to renegotiation for delays caused by the client's failure to provide specified facilities or information, or any other unpredictable occurrences.
5. Expenses -Automatic Traffic Recorder equipment usage will be billed at $25.00 per 24-hour count. Incidental expenses are reimbursable at cost, plus an administration fee of 10%. These include subconsultants, reproduction, postage, graphics, reimbursement of automobile usage at the IRS-approved rate, parking and tolls. Expenses which by company policy are not billed as reimbursable expenses to clients and therefore, will not be billed as part of this contract include the following: air travet rental car, lodging, meals, and long distance phone charges between McMahon Associates offices. If it becomes necessary during the course of this project to travel elsewhere, those travel costs will be h·eated as reimbursable expenses. These expenses will be reflected in the monthly invoices.
6. Attorney's Fees -In connection with any litigation arising from the terms of this agree1nent, the prevailing party shall be entitled to all costs including reasonable attorney's fees at both the trial and appellate levels.
7. Ownership and Use of Documents -All original drawings and information are to remain the property of McMahon Associates Inc. The client will be provided with copies of final drawings and/or reports for information and reference purposes.
8. Insurance - McMahon Associates, Inc. will maintain at its own expense Workman's Compensation Insurance, Comprehensive General Liability Insurance and Professional Liability Insurance and, upon request, will furnish the client a certificate to verify same.
9. Termination -This agreement may be terminated by the authorized representative effective immediately on receipt of written notice. Payment will be due for services rendered through the date written notice is received.
10. Binding Status - The client and McMahon Associates, Inc. bind themselves, their partners, successors, assigns, heirs, and/or legal representatives to the other party to this Agreement, and to the partners, successors, assigns and legaf representatives of such other party with respect to all covenants of this Contract. I:\Adm \GENERAL \M!SC\2020 Rates\General Municipal Rates 2020.Docx
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Date: 10/30/2020 To: Board of Supervisors From: Pipeline Task Force
Susan D' Amore RE: Pipeline Task Force Motions to be considered
At their meeting on October 22, the Pipeline Task Force discussed the Sunoco/ME whistleblower complaint in East Goshen Township involving the geophysical survey dispute. In response, the following motions were passed and are asked to be considered.
• The Task Force unanimously approved a motion requesting that the Board of Supervisors ask Chester County to utilize the County's cunent geologist to conduct an independent investigation around the Bow Tree area.
• The Task Force unanimously approved a motiou that the Board of Supervisors actively partner with Chester Couuty and other municipalities that are experiencing the same and similar issues as the Township with respect to the Mariner East pipeline construction.
• The Task Force approved a motion that the Board of Supervisors revoke the existing municipal erosion and sedimentation permit that is held by Sunoco.
F:\Data\Shared Data\ABC'S\Pipeline\Reccomendations to BOS\Memo to BOS 10302020.doc
Memo
To: Board of Supervisors From: Jon Altshul Re: Consider 2-year DVHT Agreement Addendum Date: October 30, 2020
Delaware Valley Health Trust (DVHT) is the Township's health insurance provider. For 2021, the
Executive Committee authorized a new incentive to Trust members. Specifically, if the Township formally commits to staying with DVHT through 2022, we are eligible for a credit against our premium increase, which would cause premiums to decrease by 2.87% overall compared with 2020 premiums. This decrease is reflected in the 2021 proposed budget. By contrast, if we choose not to participate in this two-year agreement option, our premiums would increase by 1.63%.
Chris and I spoke with a DVHT representative to better understand the two-year agreement option, and we feel confident that there is little to no downside risk for the Township. Specifically, by signing up, DVHT agrees to cap the 2022 premium increase at 6.5% over 2021 levels, but when the likely 2022 Rate Stabilization Credit is factored in, this maximum increase probably falls to the 4%-4.5% range.
Recommended motion: Mr. Chairman, I move that we authorize the Chairman to execute the 2-year Agreement Addendum with the Delaware Valley Health Trust
DocuSign Envelope ID: DB4430D8-4D0D-4A36-BF7B-287FC985A382
DELAWARE VALLEY HEALTH TRUST
ADDENDUM TO THE DELAWARE VALLEY HEALTH TRUST AGREEMENT
WHEREAS, East Goshen Township (the "Participant") desires to maintain its
participation in the Delaware Valley Health Trust (the "Trust") for a minimum of two (2) full
years after January 1, 2021 (through at least December 31, 2022) in exchange for the Trust
providing the Participant's existing health benefits plans in accordance with the following terms
and conditions:
• The Participant shall receive a 2021 premium credit in the amount of $32,015.00 which shall be allocated on a pro rata basis across each of the twelve monthly premium invoices for Year One (January 1, 2021 - December 31, 2021); and
• The Participant's gross premium increase for Year Two (January 1, 2022-
December 31, 2022) shall be capped at 6.5 percent (6.5%) from the unadjusted 2021 rates.
WHEREFORE, East Goshen Township hereby agrees to participate in the Delaware Valley
Health Trust for a minimum of two (2) full years after January 1, 2021 (through at least
December 31, 2022) in accordance with the terms and conditions set forth in the foregoing
whereas clause. The parties therefore agree to amend the Delaware Valley Health Trust
Agreement as set forth in this Addendum, with all other terms and conditions of the Trust
Agreement remaining in full force and effect.
AGREED:
For The Delaware Valley Health Trust BY:
Robert G. Solarz Executive Director & Trust Administrator
Dated: _________ _
For East Goshen Township BY:
E. Martin Shane Chairman Board of Supervisors
l[I DELAWARE VALLEY TRUSTS
MarJaged Risk Co!lective Rewards.
119 DRESHEr. ROAD I HORSHAM, PA 19044-22os I PHONE: (215)706"0101 ! FAX: c21s) 706-0895 I www.ovrn.usrs.coM
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 10/30/2020 To:
From: Re:
Board of Supervisors IK Mark Gordon, Township Zoning Officer /4-,/\ Paoli Pike Trail/ Segments C,D,E / PennDOT Inspection Agreement Extension
Dear Board Members,
As you know the Township Paoli Pike Trail project is nearing completion. We currently have a Construction Inspection Agreement with Traffic Planning and Design (TPD) who is performing all the Construction Inspection services required by Penn DOT. Our current agreement with TPD expires on November 29, 2020. This is not going to be enough time to complete all the closeout punch-list items, and all the final Penn DOT reimbursement paperwork. The contractor (Allan Myers) anticipated completing the project in early October; however, we are looking at mid-November now.
TPD does not anticipate any cost increases due to this agreement extension.
· Staff Recommendation: Staff recommends extending the Construction Inspection agreement with TPD Inc. until
May 29, 2021.
Draft Motion: Mr. Chairman, I move that the Board of Supervisors authorize the Township Manager to sign the letter to TPD granting an extension to the Construction Inspection agreement.
F:\Data\Shared Data\Paoli Pike Trail\Segments C,D,E Construction\Memo to BOS re. Cl Agrmt Ext. for Seg C,D,E. 10302020.doc
TRAFFJC PLANNING AND DESIGN, INC.
WWW.TRAFFIC PD.COM
October 27, 2020
Mr. Mark Gordon East Goshen Township
1580 Paoli Pike West Chester, PA 19380-6199
RE: Time Extension Request Agreement L00380 Paoli Pike Shared Use Path Project TPD No. PA06 00484
Dear Mr. Gordon,
Traffic Planning and Design, Inc. requests a time extension for the above referenced agreement. Currently, this Agreement is scheduled to expire on November 29, 2020. We are requesting an extension of this project to May 29. 2021 to cover the extension of work by the Contractor. This will also allow time for the TPD team to complete and close-out the project. It is anticipated that there will be no increase in cost due to this time extension request.
If you have any questions or concerns, please feel free to contact me at 610-326-3100.
Sincerely,
T? AF'"" \ID DESIGN, INC.
/·
(----. I I le / Anthony Dougherty, Pf ,,./
Vice President ..._,...
ADougherty@TrafficPD.com
Cc: Mr. Mark Miller, East Goshen Township Mr. Mohamed Elghawy, P.E., TPD
2500 East High Street Suite 650 610.326.3100 Pottstown, PA 19464 TrafficPD@TrafficPD.com
610-692-7171
www.eas1:goshen.org
October 30, 2020
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Mr. Anthony Dougherty, PE Traffic Planning and Design, Inc. 2500 E. High Street Pottstown, PA 19464
Re: Paoli Pike Trail Segments C, D, E Construction Inspection Agreement Extension PennDOT Agreement: L00380 TPD No. PA06 00484
Dear Mr. Dougherty:
In response to your letter dated October27, 2020, East Goshen Township hereby grants Traffic Planning and Design, lnc.'s request for a time extension to May 29, 2021 for the above referenced agreement. This extension is needed because of unforeseen construction delays and as you stated in your letter, this extension will not add additional costs, but will serve to provide additional time to TPD to close out the project with PennDOT.
Sincerely,
Louis F. Smith Jr. Township Manager
Enclosure
F:\Data\Shared Data\Paoli Pike Trail\Segments C,D,E Construction\Letter to TPD re Cl Agrmt Ext. Ltr 10302020.doc
Memo
To: Board of Supervisors From: Park and Recreation Commission Re: Paoli Pike Trail, Segment B; DVRPC Regional Trails Grant Program Application Date: November 4, 2020
The East Goshen Township Paoli Pike Trail Feasibility Study and Master Plan has identified a number of funding sources for its implementation. The DVRPC Regional Trails Grant (RTG) Program has been
identified for trail segment B to offset Township funding of the project's construction inspection. The program requires a minimum 20% local match. It is important to note that no new expenditures would need to be authorized for this grant application, the construction inspection expenditure was recently approved as an aspect of the Township's DCED-CFA Multimodal Transportation Grant application. This grant application includes a discussion of how construction funding will be secured, and it will be noted that the Township has applied for both the Penn DOT and DCED-MTF grant programs to fund Paoli Pike Trail Segment B construction. DVRPC and the Chester County Planning Commission are heavily involved in the selection process for the DVRPC RTG and DCED-MTF programs, and the Township would only accept an RTG award if successful with one of the two above construction grant applications.
DVRPC anticipates making grant selections, March 2021.
Suggested Motion: I move to authorize application for a DVRPC Regional Trails Grant Program Grant in the amount of $147,568 and approve matching funds in the amounts of $36,892.
Computer/H:/East Goshen Township/Budget
Exhibit 1 - Cost Estimate
Project: Paoli Pike Trail - Segment B (Ellis Lane to Reservoir Road) Applicant: East Goshen Township
Total MTF Requests
Administrative $ 6,940 Continqencv $ 134,100 $ 123,600 Preliminary Engineering $ 228,000 Environmental Clearance $ 25,000 Final Design $ 192,586 Right-of-Way $ 179,300 Utilities $ 15,000 Construction $ 2,681,440 $ 2,681,440 Inspection $ 184,460 Total $ 3,646,826 $ 2,805,040
Percent of Local Match
Notes and Assumptions:
10/21/2020
Local Match
Funding $ 6,940 $ 10,500 $ 228,000 $ 25,000 $ 192,586 $ 179,300 $ 15,000
$ 184,460 $ 841,786
30.010%
Construction estimates are based on quantities derived from the trail plans and unit prices from recently bid local projects with PennDOT oversight. (Estimated quantities and unit costs are provided on the following page.)
The costs for utility relocations are rough estimates for budgeting purposes only. The costs associated with these items will need to be determined through the development of the project. The Engineer's Conceptual Opinion of Cost does not include the provision of any future utilities.
The estimate includes a contingency of 5% of infrastructure cost.
The Engineer's Conceptual Opinion of Cost does not include any environmental remediation (including but not limited to removal and replacement of contaminated soils) or environmental impact mitigation. Post-construction stormwater management is included in the estimate. However, these estimates do not consider credits or deductions from other Township capital projects.
Disclaimer: This opinion of cost was prepared at the request of East Goshen Township for the purpose of the Multimodal Transportation Fund (MTF) grant application. This opinion of cost is based on the trail plans developed to date. Please note that opinions of cost are subject to change based on plan/design revisions, fluctuations in unit costs, field conditions, and differences in locale. Opinions of cost are provided for use in budgeting, but in no way
intended to be construed as a final cost for the project. Final costs are contingent only on actual bids from contractors.
Cost estimate pm paced oodec the d;rn,tioo ot -------------------------
Stephen C. Giampaolo, P.E. McMahon Associates, Inc. MCMAHON
835 Springdale Drive, Suite 200 Exton, PA 19341
TRANSPORTATION ENGINEERS B, PLANNERS (610) 594-9995 sgiampaolo@mcmahonassociates.com
Engineer's Conceptual Opinion of Cost Project: Pao If Pike Trafl -Segment B {Ellis Lane to Reservoir Road) Applicant: East Goshen Township
Item
No, Description Comment
Standard (terns 1 Clearing and Grubbing
2 Excavation Includes plac!ng of excavated material
required for fills as embankment. 3 Class 1 B Excavation Removal of Existing Pavement
4 Full Depth Bituminous Pavement + Wearing Course (10" Bituminous Base Course & 8" Subbase) 5 Driveway Adjustments 6 Full Depth Trail Pavement (Wearing, Base and Subbase) Impervious 7 1.5" Pervious Bituminous Wearing Course 8 2.5" Pervlous Bituminous Binder Course 9 No. 57 Coarse Aggregate 10 No. 3 Coarse Aggregate 11 Geotexllle, Class 4, Type A 12 Type 31-SC Guiderail Replace Existing 13 Permanent Impact Attenuating Device Replace Existing
14 Plain Cement Concrete Curb 15 Cement Concrete Sidewalk 16 Construction Surveying, Schedule, Equipment Package 17 ADA Accessible Curb Ramp at signalized intersection at a signalized intersection 18 Detectable Warning Surface at a driveway 19 Trame Signal Upgrades Push Button upgrades 20 24" VV'hlte Pavement Markings, Hot Thennoplas!ic Paint 21 W'hile Yield line, Hot Thermoplastic Paint 22 "HWY XING" Legend, Hot Thermoplastic Paint 23 Signage 24 Placed Stockpiled Topsoil 25 Seeding and Soil Supplements, Fonnula B Includes Mulching 26 Amended Soils 27 Sodding
Special Items 28 Cleanout 29 8" HOPE (Pert) 30 Impervious Clay Block 31 Tree Replacement 32 Relocate Ground light 33 Split Rail Fence
Structure Spanning Ridley Creek 34 Furnish Weathered Slee!, Wooden Deck Structure 12' Walking Surface, 54" Railings 35 Center Span Support Piers Concrete Piers, Footings and Excavation 36 Placement of Structure 37 Construction of Concrete Footings and Abutments
38
Excavation, Backfill
39 Subtotal Trail Construction Cost Items 1 - 38 40 Maintenance and Protection of Traffic Approx. 12% of Items 1 - 33 41 Erosion and Sediment Control Approx. 5% of Hem 39 42 MobJ!ization 6% of Item 39 43 Contin"enc" Annrox. 5% of!lems 1 - 38 44 Total Trall Construction Cost Items 39 "43 45 Construction lnјecllon 6.5% of Item 44 46 Total Trail Construction+ /nsnection
10/21/2020
Unit Quantity Unit Cost Cost
LS 1 $150,000.00 $150,000.00 CY 2,300 $60.00 $138,000.00 CY 310 $85.00 $26,350.00 SY 80 $175.00 $14,000.00 SY 240 $75.00 $18,000.00 SY 900 $55.00 $49,500.00 SY 2,080 $17,00 $35,360.00 SY 2,080 $26.00 $54,080.00 CY 60 $90.00 $5,400.00 CY 1,800 $55.00 $99,000.00 SY 3,160 $3,00 $9,480.00 LF 370 $38.00 $14,060.00 EA 2 $3,000.00 $6,000.00 LF 260 $55,00 $15,400.00 SY 90 $150.00 $13,500.00 LS 1 $20,000.00 $20,000.00 EA 6 $3,500.00 $21,000.00 EA 120 $50.00 $6,000.00 LS 1 $35,000.00 $35,000.00 LF 850 $8.00 $6,800.00 LF 26 $60,00 $1,560.00 EA 6 $150.00 $900.00 EA 24 $150.00 $3,600.00 CY 840 $75.00 $63,000.00 LB 100 $30,00 $3,000.00 CY 880 $90,00 $79,200.00 SY 3,200 $12.00 $38,400.00
EA 1 $1,600.00 $1,600.00 LF 85 $50.00 $4,250.00 EA 18 $1,350.00 $24,300.00 EA 5 $1,000.00 $5,000.00 EA 1 $1,000.00 $1,000.00 LF 2,100 $35.00 $73,500.00
LS 1 $940,000.00 $940,000.00 LS 1 $100,000.00 $100,000.00 LS 1 $100,000.00 $100,000.00 LS 1 $80,000.00 $80,000.00 LS 1 $37,000.00 $37,000.00
$2,293,240.00
$124,400.00 $126,200.00 $137,600.00 $134,100.00 $2,815 540.00
$184,460.00 $3 000,000.00
Memo East Goshen Township
Date: November 5, 2020 To: Board of Supervisors From: Susan D'Amore
RE: Declaration of Restrictive Covenant for Milltown Dam
As you know, the Township has received a Department of Conservation and Natural Resources
(DCNR) Grant for the Milltown Dam. I am currently compiling the documents for the design submission packet for DCNR.
The Chairman's signature is required on the attached document, Declaration of Restrictive Covenant. Our solicitor will then have it recorded for inclusion in the design submission packet for DCNR.
Mr. Chairman, I move that the Board approve your signature on the Declaration of Restrictive Covenant.
F:\Data\Shared Data\Milltown Dam Project\DEP Mariner 2 (Landmark Penalty) Grant\Design Submission\Declaratlon of Restrictive Covenant MD memo to BOS 110520.docx
Prepared by/Return to: Kristin S. Camp, Esquire BUCKLEY, BRION, MCGUIRE & MORRIS LLP 118 West Market Street, Suite 300 West Chester, PA 19382
UPI No.: 53-6-87.1-E
DECLARATION OF RESTRICTIVE COVENANT
THIS DECLARATION OF RESTRICTIVE COVENANT ("Declaration") is executed
this __ day of _______ , 2020, by EAST GOSHEN TOWNSHIP, a political
subdivision of the Commonwealth of Pennsylvania having an address of 1580 Paoli Pike,
West Chester, Pennsylvania 19380 (hereinafter referred to as "Declarant").
BACKGROUND
WHEREAS, Declarant acquired a certain tract of property identified as Chester
County Tax Parcel No. 53-6-87.1-E located on the east side of Reservoir Road in East
Goshen Township (the "Property") in a Deed dated January 16, 1985 from Robert C.
Wiggins and Mary Ann Wiggins, which Deed was recorded in the Chester County
Recorder of Deeds in Deed Book Y64, Page 499 on January 21, 1985; and
WHEREAS, a legal description of the Property is attached hereto as Exhibit A; and
WHEREAS, the Property, or interest in the Property, will be developed with funds
provided by the Pennsylvania Department of Conservation and Natural Resources
("Department"). The source of the funds is the Land and Water Conservation Fund Act,
16 U.S.C. § 4601-4 et seq (the "Act"); and
WHEREAS, the Department requires Declarant to execute and record this
Declaration to satisfy its obligations under the grant;
NOW, THEREFORE, Declarant for itself, its successors, grantees and assigns, for
good and valuable consideration, the receipt and sufficiency whereof being hereby
acknowledged, and intending to be legally bound hereby, covenants, declares, agrees,
confirms and provides as follows:
1. Incorporation of Background. The background paragraphs above
are incorporated as part of the terms of this Declaration.
2. Restrictive Covenant. The Property, or interest in property, was
either acquired with, or developed with funds provided by the Pennsylvania Department
of Conservation and Natural Resources ("Department"). The source of the funds is the
Land and Water Conservation Fund Act, 16 U.S.C. §§ 4601-4 et seq. ("Act"), provided
through the National Park Service. The Property, or any portion of it, may not be converted
to purposes other than those authorized under the Act for property acquired and/or
developed with Department funds. No change of use and no transfer of ownership,
control, or interest in the Property may occur, and no encumbrance may be placed on the
Property, without the written consent of the Department or its successor. The restriction
in this paragraph applies to both the surface and subsurface of the Property. This
restriction has the effect of a covenant running in perpetuity with the land and is binding
upon the owner(s) of the Property and upon all subsequent owners, successors, and
assigns. This restriction is enforceable by the Department and its successors.
3. Recording. This Agreement shall be recorded in the Office of the
Recorder of Deeds of Chester County, Pennsylvania.
2
IN WITNESS WHEREOF, being duly authorized and empowered to do so, the
Declarant has duly executed and delivered this Declaration of Restrictive Covenant as of
the date and year first above written.
ATTEST:
By: Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
E. Martin Shane, Chairman
3
COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF CHESTER
On this, the ___ day of _______ _, 2020, before me, the
undersigned officer, personally appeared E. Martin Shane who acknowledged himself to
be the Chairman of the Board of Supervisors of East Goshen Township and that he being
authorized to do so, executed the within instrument for the purposes therein contained.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal.
NOTARY PUBLIC
MY COMMISSION EXPIRES:
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 11/5/2020 To: Board of Supervisors From: Mark Gordon, Zoning Officer
Re: Solar Ordinance Amendment (Accessory Use)
Dear Board Members,
Staff has determined the need for an amendment to the solar ordinance for rooftop solar energy systems. The Zoning Ordinance regulates rooftop solar energy systems as an Accessory use in §240-32. Specifically, it regulates the spacing on the
roof, and as it turns out, the International Fire Code (IFC) already does that. Our requirements are significantly more stringent than outlined in the fire code, making rooftop solar systems less feasible in East Goshen Township because less solar panels can be installed on the roof.
§240-32 O.(l)(e) A roof-mounted system may be mounted on a principal building or accessory building. A
roof-mounted system, in the case of a flat roof, whether mounted on the principal building or accessory building, may exceed the maximum principal building height or accessory building height specified for the building type in the underlying zoning district
by no more than two feet. Rooftop solar energy systems shall be placed a minimum of three feet from any roof edge, valley or ridge in order to provide for adequate access paths on the roof Rooftop solar energy systems shall not be included in the calculation of
building height.
This standard is more restrictive than the International Fire Code (IFC), which makes the addition of solar panels, cost prohibitive in many cases.
Staff recommends amending the ordinance by striking the entire sentence highlighted above. Having this more stringent standard in the zoning ordinance is burdensome, unnecessary, and prevents the installation of solar energy systems in many cases.
F:\Data\Shared Data\Admin Dept\Township Code\Solar Ord. Amendment 2020\Memo to BOS w Draft Motion 11052020.doc
Recommended Draft Motion:
Mr. Chairman, I move that the Board of Supervisors support a zoning ordinance text amendment eliminating the dimensional standards within section §240-32 0.(1)(e} pertaining to the placement of accessory use rooftop solar energy systems on roof tops, and direct staff to advertise a Zoning Ordinance amendment hearing for December 1, 2020.
F:\Data\Shared Data\Admin Oept\Township Code\Solar Ord. Amendment 2020\Memo to BOS w Draft Motion 11052020.doc
AREA CODE 610
692-7171
November 5, 2020
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Re: Zoning Ordinance Amendment/ Accessory Rooftop Solar Energy Systems
Dear Board Members:
At their meeting on November 4, 2020, the Planning Commission voted in favor of the following motion:
Mr. Chairman, I move that we recommend that the Board of Supervisors support a zoning ordinance text amendment to eliminate the dimensional.standards within section §240-32 0.{1}{e), pertaining to the placement of accessory use rooftop solar energy systems on roof tops.
Sin
7JL
Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Admin Dept\Township Code\Solar Ord. Amendment 2020\PC Rec to BOS 11052020.doc
NBWYORK
LONDON
SINGAPORE PHILADELPHIA
CHICAGO WASHINGTON, OC
SAN FRANCISCO SILICON V ALIBY
SAN DIEGO LOSANGEIBS
TAIWAN BOSTON HOUSTON
AUSTIN
HANOI HOCHIMINHCITY
October 14, 2020
Kristin Camp
Duane Morris®
FIRM and AFFlllAIE OFFICES
GEORGE J. KROCULJCK DIRECT DIAL:+ 1215 979 1386 PERSONAL FAX: +l 215 689 2910 E-MAIL: GJKroculick@duanemorris.com
www.duanemorris.com
Solicitor, Township of East Goshen Buckley, Brion, McGuire & Morris 118 W. Market St., Suite 300 West Chester, PA 19382 kcamp@buckleyllp.com
Re: East Goshen Proposed Pipeline Saturation Ordinance
Dear Ms. Camp:
SHANGHAI
ATLANTA BALTIMORE WILMINGTON
MIAMI BOCA RATON
PITTSBURGH
NEWARK LASVEGAS CHERRYHILL LAKE TAHOE
MYANMAR
OMAN
A GCC REl'1UtSENTA1WE OFFICE
OF WANE MORRJS
ALLIANCESINMEXICO
AND SRI LANKA
I represent Sunoco Pipeline L.P. ("Sunoco Pipeline"), which is a certificated public utility corporation regulated by the Pennsylvania Public Utility Commission (the "PUC"). See In re Condemnation by Sunoco Pipeline L.P. ("Martin"), 143 A.3d 1000 (Pa. Cmwlth. 2016) (en bane), allocatur denied, 164 A.3d 485 (Pa. Dec. 29, 2016). As you !mow, Sunoco Pipeline owns and operates and/or is constructing several natural gas liquids pipelines tln·ough easements it owns in East Goshen Township. The easements in East Goshen Township fotm patt of an interconnected line of easements stretching hundreds of miles across the Commonwealth, allowing pipeline service authoriz.ed by the PUC to operate.
I write to address the East Goshen Board of Supervisors' ("Board") recent consideration of a so-called Pipeline Saturation Ordinance ("Proposed Ordinance"), discussed at the Board's October 6, 2020 meeting. According to the current language of the Proposed Ordinance made available to the public prior to the October 6 meeting, the Proposed Ordinance would provide that "no Person shall construct a new Natural Gas Pipeline or Hazardous Liquid Pipeline within the boundaries of East Goshen Township." Proposed Ordinance, § 2. In addition, the Proposed
Ordinance would allow replacement of an existing pipeline "provided that the location of the replaced pipeline is confmed to the same property or easement" and would allow repair of
DUANE MORR1S LLP
30 SOU'IH 171H SlREET PHILADELPHIA,PA 19103-4196 PHONE: +1215 979 1000 FAX: +l 215 979 1020
Kristin Camp October 14, 2020 Page 2
Duane Morris
existing pipelines without limitation. Proposed Ordinance, § § 3, 4. And fmally, the Proposed Ordinance would create criminal liability for a violation of its prohibitions, carrying the possibility of fmes and imprisonment. Proposed Ordinance, § 5.
The Proposed Ordinance runs afoul of Pennsylvania law in numerous respects and, if enacted, would be struck down in its entirety upon judicial challenge. For your information, a brief summary of the Proposed Ordinance's legal infnmities follows.
A. The Proposed Ordinance is preempted by state regulation.
Pennsylvania municipalities have no authority to regulate the implementation and construction of public utility facilities, because the PUC has exclusive jurisdiction over the regulation of public utilities and their facilities. See Duquesne Light Co. v. Monroeville Borough, 298 A.2d 252, 256 (Pa. 1972) (noting that the PUC has exclusive regulatory jurisdiction over the implementation of public utility facilities). The policy behind this principle
is that subjecting public utilities to a multitude of jurisdictions would result in "twisted and knotted" public utilities, with consequent harm to the general welfare. See County a/Chester v. Philadelphia Electric Ca.,218 A.2d 331 (Pa. 1966).
In contrast to other businesses, "the General Assembly has sought to ensure that utilities are bound to a uniform, statewide regulatory scheme rather than a crazy quih of local regulations." PPL Elec. Utils. Corp. v. City of Lancaster, 214 A.3d 639, 643 (Pa. 2019). Thus, for public utilities like pipelines, "the legislature plainly intended that discretionary decision making be vested in one regulatory body, in furtherance of uniformity of application." Id. at 656. ''Local authorities not only are ill-equipped to comprehend the needs of the public beyond their jurisdiction, but, and equally impotiant, those authorities, if they had the power to regulate, necessarily would exercise that power with an eye toward the local situation and not with the best interests of the public at large as the point of reference." Duquesne Light Co., 105 A.2d at 293 (emphasis added); see also Delaware Riverkeeper Networkv. Sunoco Pipeline L.P., 179 A.3d 670, 690-92 (Pa. Cmwlth. 2018) (holding that counties are preempted from regulating the location of the Mariner East 2 pipeline).
In County a/Chester, the county enacted an ordinance that prohibited the construction of pipelines unless the company proposing to constrnct a pipeline first submitted plans and
specifications to the Chester County Planning Commission for review and approval This ordinance, which prohibited pipeline construction without Planning Commission approval, was less draconian than the Proposed Ordinance, which would prolu.bit pipeline construction outright. And the Supreme Court struck down the ordinance in County a/Chester, stating that the legislature "has vested in the Public Utility Commission exclusive authority over the complex and technical service and engineering questions arising in the location, construction and maintenance of all public utilities facilities." Id. at 333.
Kristin Camp
October 14, 2020 Page 3
Duane Morris
Because the Proposed Ordinance would prohibit all construction of new natural gas and hazardous liquid pipelines in East Goshen, it clearly intrudes on regulat01y territory reserved exclusively to the PUC. In addition, because the Proposed Ordinance would pnrport to limit the location of replacement of existing pipelines, it would also intrude on the PUC's regulato1y authority as well as that of the Department of Environmental Protection ("DEP"), which has authority to regulate pipeline routes and siting. For these reasons, the Proposed Ordinance is preempted.
B. The Proposed Ordinance lacks a rational basis.
A rational basis must underlie any legislative enactment regulating economic activity. Germantown Cab Co. v. Philadelphia Parking Auth., 206 A.3d 1030, 1043-44 (Pa. 2019). The enactment also must further a legitimate state purpose. Id. at 1044.
The recitals of the Proposed Ordinance cite numerous provisions of the Pennsylvania Constitution, including those related to inherent rights of mankind (Section 1), political powers of the people (Sections 2 and 25), discrintination and civil rights (Section 26), and natural resources (Section 27). But the Proposed Ordinance does not detail in any way how it would promote or achieve these legitimate state pnrposes. The Proposed Ordinance lacks any fmdings of fact that could substantiate that its overt interference in economic activity will advance a legitimate legislative purpose. Accordingly, a court would certainly strike down the Proposed Ordinance as lacking a rational basis.
C. The Proposed Ordinance would impair private property rights.
Pipelines, including the natural gas and hazardous liquid pipelines that would be prohibited by the Proposed Ordinance, are constructed over an uninterrupted series of permanent easements acquired by the pipeline operator along the route of the pipelines. The vast majority of those permanent easements are voluntarily given by private landowners, who receive compensation in exchange for the property rights granted to the pipeline company. In many cases, that compensation can be substantial. The right to alienate a portion of one's property in exchange for money, in the form of an easement, is among the "bundle of sticks," or individual rights, that constitute property. See, e.g., US. v. Craft, 535 U.S. 274, 278 (2002).
But the Proposed Ordinance would deprive private landowners in the Township of potential remuneration given in exchange for easement rights. It would take a stick out of the bundle of sticks that all property owners now enjoy.
Furthermore, the Proposed Ordinance would unilaterally alter the terms of easements already granted within the Township. Owners of existing pipelines operate those pipelines according to permanent easements, which specify, among other things, whether, how, and in what fashion the company may repair or replace existing lines. These easements are recorded with the Office of Recorder of Deeds of Chester County and run with the land on which they are given. But the Proposed Ordinance would purport to unilaterally rewrite the terms of all of these
Kristin Camp October 14, 2020 Page4
Duane Morris
easements by declaring that existing pipelines "may be replaced provided that the location of the replaced pipeline is confmed to the same property or easement." Proposed Ordinance, § 3. The Township lacks the power to unilaterally rewrite the terms of recorded easement agreements in this way.
For all of the above reasons, the Proposed Ordinance is invalid. We urge the Board to reconsider its proposed adoption.
This letter is for the Board's information only and is not submitted for any approval or other action by the Board. If you have any questions, please do not hesitate to contact me.
GJK
cc: Rick Smith, Township Manager
Sincerely,
Isl c;eorgeJ. k,roe,l.,{_LLe,fs
George J. Kroculick
EAST GOSHEN TOWNSHIP
MEMORANDUM
TO: BOARD OF SUPERVISORS
FROM: CHRIS BOYLAN
SUBJECT: INDEPENDENT AUDIT REPORT RE: KEYSTONE COLLECTIONS
DATE: OCTOBER 16, 2020
East Goshen Township received Boyer & Ritter LLC's Independent Audit Report from the CCTCC in reference to Boyer & Ritter's audit performed relative to Keystone Collections for the period July 1, 2019 through June 30, 2020.
Please see the enclosed cover letter of their SO-page report. If you would like to review the entire report, please reach out to me and I will share it with you.
U:\CBoylan\Board of Supervisors\Keystone Audit Report from Boyer and Ritter 10-2020.docx
Boyer &Ritter LLC Certified Public Accountants and Consultants
KRA TZENBERG & ASSOCIATES, INC., d/b/a KEYSTONE COLLECTIONS GROUP
Report on Keystone Collection Group's Description of its
Tax Collection System, the Suitability of the Design and
Operating Effectiveness of its Controls
System and Organization Controls ("SOC") Report - SOC 1, Type 2
FOR THE PERIOD JULY 1, 2019 to JUNE 30, 2020
Boyer &Ritter LLC Certified Public Accountants and consultants
INDEPENDENT SERVICE AUDITOR'S REPORT
Board of Directors Kratzenberg & Associates, Inc.
d/b/a Keystone Collections Group Irwin, Pennsylvania
Scope
We have examined Kratzenberg & Associates, Inc.'s, d/b/a Keystone Collections Group, description of its tax collection system throughout the period July 1, 2019 through June 30, 2020, the suitability of the design and operating effectiveness of controls to achieve the related control objectives stated in the description, based on the criteria identified in Keystone Collections Group Assertion. The controls and control objectives included in the description are those that management of Keystone Collections Group believes are likely to be relevant to user entities' internal control over financial reporting, and the description does not include those aspects of the tax collection system that are not likely to be relevant to user entities' internal control over financial reporting.
Keystone Collections Group uses First Data, a subservice organization for the processing of taxpayer credit card transactions. The description includes control objectives and related control objectives of Keystone Collections Group and excludes the control objectives and related controls of the subservice organization. The description indicates that certain control objectives specified by Keystone Collections Group can only be achieved if complementary subservice organization controls, assumed in the design of Keystone Collections Group's controls, are suitably designed and operating effectively, in conjunction with related controls of Keystone Collections Group. Our examination did not extend to controls of the subservice organization, and we have not evaluated the suitably of the design or operating effectiveness of such complementary subservice organization controls.
The description indicates that certain control objectives specified in the description can be achieved only if complementary user entity controls assumed in the design of Keystone Collections Group's controls are suitably designed and operating effectively, along with related controls at the service organization. Our examination did not extend to such complementary user entity controls and we have not evaluated the suitability of the design or operating effectiveness of such complementary user entity controls.
1
Boyer &Ritter 1..1.c certified Public Accountants and Consultants
Service Organization's Responsibilities
In Section II of this report, Keystone Collections Group has provided an assertion about the fairness of the presentation of the description and suitability of the design and operating effectiveness of the controls to achieve the related control objectives stated in the description. Keystone Collections Group is responsible for preparing the description and for the assertion, including the completeness, accuracy, and method of presentation of the description and the assertion, providing the services covered by the description; specifying the control objectives and stating them in the description; identifying the risks that threaten the achievement of the control objectives, selecting the criteria; and designing, implementing and documenting controls to achieve the related control objectives stated in the description.
Service Auditor's Responsibilities
Our responsibility is to express an opinion on the fairness of the presentation of the description and on the suitability of the design and operating effectiveness of the controls to achieve the related control objectives stated in the description, based on our examination. We conducted our examination in accordance with attestation standards established by the American Institute of Certified Public Accountants. Those standards require that we plan and perform our examination to obtain reasonable assurance about whether, in all material respects based on the criteria in
management's assertions, the description is fairly presented and the controls were suitably designed and operating effectively to achieve the related control objectives stated in the description throughout the period July 1, 2019 through June 30, 2020.
An examination of a description of a service organization's system and the suitability of the design and operating effectiveness of the service organization's controls to achieve the related control objectives stated in the description involves performing procedures to obtain evidence about the fairness of the presentation of the description and the suitability of the design and operating effectiveness of those controls to achieve the related control objectives stated in the description, based on the criteria in management's assertions. Our procedures included assessing the risks that the description is not fairly presented and the controls were not suitably designed or operating effectively to achieve the related control objectives stated in the description. Our procedures included testing the operating effectiveness of those controls that we considered necessary to provide reasonable assurance the related control objectives stated in the description were achieved. An examination engagement of this type includes evaluating the overall presentation of the description and the suitability of the control objectives stated therein, and the suitability of the criteria specified by the service organization as described in Section III of this report. We believe the evidence we obtained is sufficient and appropriate to provide a reasonable basis for our opinion.
2
Boyer &Ritter LLC Certified Public Accountants and Consultants
Inherent Limitations
The description is prepared to meet the common needs of a broad range of user entities and their auditors who audit and report on user entities' financial statements and may not, therefore, include every aspect of the system that each individual user entity may consider important in its own particular environment. Because of their nature, controls at a service organization may not prevent or detect and correct, all errors or omissions in processing or reporting transactions. The projection to the future of any evaluation of the fairness of the presentation of the description, or conclusions about the suitability of the design or operating effectiveness of the controls to achieve the related control objectives, is subject to the risk that controls at a service organization may become inadequate or fail.
Other Information
The information in Section V of management's description of the service organization's system, "Other Information Provided by Keystone Collections Group," that describes Keystone Collections Group's business continuity and disaster recovery plan, is presented by management of Keystone Collections Group to provide additional information and is not part of Keystone Collections Group's description of its tax collection system made available to user entities during the period July 1, 2019 to June 30, 2020. Information about Keystone Collections Group's business continuity and disaster recovery plans has not been subjected to the procedures applied in the examination of the description of the tax collection system and of the suitability of the design and operating effectiveness of controls to achieve the related control objectives stated in the description of the system and accordingly, we express no opinion on it.
Opinion
In our opinion, in all material respects, based on the criteria described in Keystone Collections Group's assertion in Section II of this report:
a. The description fairly presents the tax collection system that was designed and implemented throughout the period July 1, 2019 through June 30, 2020.
b. The controls related to the control objectives stated in the description were suitably designed to provide reasonable assurance the control objectives would be achieved if the controls operated effectively throughout the period July 1, 2019 through June 30, 2020, and subservice organization and user entities applied the complementary controls assumed in the design of Keystone Collections Group's controls throughout the period July 1, 2019 through June 30, 2020.
c. The controls operated effectively to provide reasonable assurance the control objectives stated in the description were achieved throughout the period July 1, 2019 through June 30, 2020, if the complementary subservice organization and user-entities controls assumed in the design of Keystone Collections Group's controls operated effectively throughout the period July 1, 2019 through June 30, 2020.
3
Boyer &Ritter LLc certified Public Accountants and Consultants
Description of Tests of Controls
The specific controls tested and the nature, timing, and results of those tests are listed in Section IV of this report.
Restricted Use
This report, including the description of tests of controls and results thereof in Section IV of this report, is intended solely for the information and use of Keystone Collections Group, user entities of Keystone Collections Group's tax collection system during some or all of the period July 1, 2019 through June 30, 2020, and the independent auditors of such user entities, who have a sufficient understanding to consider it, along with other information including information about controls implemented by user entities themselves, when assessing the risks of material misstatements of user entities' financial statements. This report is not intended to be and should not be used by anyone other than these specified parties.
Camp Hill, Pennsylvania September 28, 2020
4
Kristine Ka/linen- 131 Valley Rd. -7- a,J/13. 29 year landowner, 6.5 _acres, 1 acre pond, lot .1 of 1992 subdivision. HOD is next door
1011s120 . <(2ec..' r.::> Io/ ;;...1 /;; _ _'o l Dear Valley Rd Neighbor:
& A hydrotest started at 143 Valley Rd on 10/10/20 that ffiled my pond. I reported the issue but .. nothing is being done. • Sunoco refuses to conduct a geophysical assessment on my pi'operty stating my property is 'out ofJ the profile'. My property line is exactly 30 feet from the LOD (Limit of Disturbance). Sunoco's engineeri}ig firm called out the location of my property (SE of the entry site) needs to be monitored during HDD ! operations, but was not. I have over 70%+ in very steep slope conditions, weathered bedrock, and loami, silty soil types. My land should NEVER have been subdivided frqm the property which Sunoco now ow4s. • 20+ deep holes appeared in the pond at the start of the 20" HDD. The pond has a direct feed to
j Rocky Run. I have proved the contamination in the pond is coming from the migration path when wat .r tests by location in the pond were done on 5/12/20. I have stopped waters going in/out to the creek to control further pollution. Rocky Run is one of the last HQ's left in Delco. • A migration path exists on my property. My well and pond remain contaminated. I have over 10 0 photos, videos, and emails over the last 3 years to support my claims. I have yet to retain an attorney.
8 We need to tell the township to STOP MARINER 2 on Valle Rd immediatel . W: need to recognize the steps that East Goshen -Township is doing..
= ·
• Please read the following 3 articles which have simi.lar conditions or potential to the Valle These are extracts from the Dragonpipe site, Statelmpact.
*************** l. A sinkhole caused by pipeline construction along a busy road in suburban East Goshen Township, Chester County, could easjly have caused a major disaster. The sinkhole threatened the integilliU!f.QJi.crational pipelines carrying highly volatile / explosive materials. Sunoco was able to cover up the incident for six months, and we might never have known if the
ʋhistJeblower hadn't stepped forwʌrd: .. ʍ,si_nkhole nʎ_ar,ʏ.oʐtree Drʑve ori R°.uf.e: .. 2 - !'ʒʓ-aʔtive 'Ma1:iner Eaʕt pipelines rup m the easement here, and two more are under constrtttt1bn. f-he wh1stlebl.ower, a profes:;1phal geologist workmg for Sunoco, was concerned that if the sinkhole caused the supporting earth to drop away from under one of the pipelines, the pipeline 1
rriight rupture. As the whistleblower pointed ol:J.t, that-is similar to·•what happened in the Beaver County explosion on Sunoco's Revolution pipeline. · ·. •.. ·. ·;, .• ·, · ···: ···.··• ·· · : Jhis is exactly the sort of situation that thos·e of us ·concei·n.ed aboiit Mariner East safetv issues worry about. and if it involved .Mariner East it would be far more dangerous tha!..1..tb..e..ll.e.e,vet..Counʖosion, which involved natural gas. Natural gas is lighter than air and disperses readily: the highly volatile Jiq·uids carried by Mariner East (ethane. butane. and propane) are heavier than air and_pool along the ground. fonhing a flammable vapor cloud. Who would be endangered? In the event of a Mariner East rup.ture at the Bowtree site, if the cloud didn't immediately ignite; it would cover a large area of East Goshen Township until it finally reached a source of ignition. The area threatened by this tyjPe of event depends on several factors, such as the size of the pipe, the size of the release, and the weather. If Sunoco comoletes the J 6-inch and 20-inch pipelines here. those two pipelines would also be vulnerable to rupture. In that case, the area affect°kd would be far larger, stretching out to well over a mile fi:'0111 the rupture location. It is.worth emphasizing that, although SI.ind· o filled in the sinkhole, we don't know what's happening t1nderground, The er1rth may still be unstable, which means that the danger from a rupture is not over-and it still won't be over, even when construction is complete. East Goshen Township will act. Once the township recognized the extent of the risk that Sunoco-was attempting to hide, they decided that action was necessary. The following announcement was posted on the website: "The Board o Su e isors a d the '.GT Pipeline Task Force were recently made aware ofa Y.l!...histleblower complaint involving the Sunoco/ET Mariner pipe/inf in East Goshen Township. This matter involves a dispute regarding geophysical surveys required for Horizontal j Directional Drilling conducted along Route 352 [North Chester Road . The Board o Su ervisors takes this matter ver · z(!riously and is conferring with legal counsel to determine next steps." It is my understanding that this situation is
prompting other jurisdictions to consider their own legal action or to join in-whatever action East Goshen decides to take. It's not just East Goshen, it's all across the state. Sunoco's construction has triggered sinkholes at many locations that we kn9w about besides East Goshen. And if Sunoco has made a general practice of covering up .these events, as the whistle blower suggests, there could be many more sinkhole locations in less-populated areas that we don't yet know about. There may weil be the potential for the·same kind of rupture at many lo:::at:ions across the state. '· · ·, ·
· Sunoco sued for covering up pipeline ptoblems A new legal battle ·over the Dragonpipe (Mariner East pipeline system) was launched yesterday (October 7, 2020) with the announcement of a suitʗinst Sunoco for covering up adverse-,..geological findʘ. The Clean Air Council has announced •its intent to file suit under Pennsylvania's Clean Streams Act. Under its DEP pipeline permits, Sunoco was required to hire ! . I
. , ., I professional geologists (PGs) to ll}Onitor its worksites f01, potential environmental problems. But starting in 2020, according to the suit, those PGs were systematically prevented from reporting information that might result in work begin slowed down. The "Notice of Intent to Sue" lists two major problem areas. First, Sunoco is· preventing its PGs from properly reporting problems, such as sinkholes, which may lead to pollution. l_nstead, the PGs must report the sinkholes as "earth features", which means they do not require DEP investigation and approval for continued work. Sunoco is also preventing the PGs from investigating and reporting any problems that lie outside a Sunoco-defined "limit of disturbance". even if the problem is cle I , construction-related. Further. PGs were ordered to stop monitoring problems after a wee)<. even if the problem continued . . The second area addressed by the suit is the fraudulent modification of data. Sunoco is requiring PGs to submit editable reports, which non-geologists then modify before submitting them to the DEP. The company also insists that the PGs make their findings match those of Sunoco's own inspectors. Sunoco will not permit the PGs to speak to third parties (such as drillers or inspectors from the PUC and DEP). They can speak only to Sunoco's own inspectors. The role of the PGs in the construction process is supposed to be to provide an independent assessment. separate from that of the company, on environmental issues. These Sunoco policies have removed that independence. Statelmpact reports that the suit was trigge ed by a professional geologist who was terminated because his reports did not conform to these rules.
Drilling fluid: no possible harm, right? Those of us who went to any of Sunoco/ETP's public presentations know what a show they made of the innocuous nature o drilling fluid. It is composed almost entirely ofbentonite clay aud water and is routinely used for drilling water wells. Suno,o/ETP will tell you th0,t you could consume it--if you could face drinking mud-and not be. ],armed. That is probably I
true, and yet it does not prove that drilling fluid is harmless. The problem is not what happens when drilling fluid is consumed. The problem is that drilling fluid can do unexpe,ted things underground.
Problems at Chester Creek. This problem was already evident shortly aݣer drilling began at the very first drill site in our arݤa: Judy Way in Aston, PA. The drilling of the pilot hole had only gone a few hundred feet when, on May 11 and 12, drilling fluidj
started welling up in people's lawns on Chester Creek Road (in Brookhaven) and in the bed of Chester Creek itself. Drilling
1 as stopped for a time. But when it resumed, on June 25, a new outflow of drilling fluid occurred in Chester Creek. This incident is instructive because it shows how drilling fluid can flow uncontrollably underground. In a public meeting,
Sunoco/ETP reported that the drill was about 50 feet below ground level when the fluid emerged. And the locations where
i
· surfaced were about 100 feet laterally from the intended route of the pipeline. (The fluid emerged in Brookhaven Borough, . o part of which is actually on the pipeline route.) Clearly, the drilling fluid had travelled far from the location of the drill bit. ; . Drilling fluid is pumped through the drill pipe, and it serves as a lubricant for the drill bit. In addition, its fluid pressure is us/'d
to turn the drill bit and to re-direct drilling when the bit strays from the intended route. Normally, the fluid flows back up l along the drill hole to the drill site, where it is collected in a pit at the point where the drill enters the ground. It is pumped ! from the pit and filtered to remove rock chips and other bits of debris, and then the fluid is used again. Drilling fluid does not necessarily go where it is supposed to. But nothing forces the fluid to return along the hole if there ark other places it can go. The pressure of the drilling fluid also causes it to flow into any available cracks and gaps that the drilllbit ' encounters. The pressure of the fluid can itself cause the rock to fracture. (In drilling industry jargon. the name for this is a > "frac-out".) If the cracks lead to the surface. the fluid will emerge there. ETP refers to this situation by the euphemism "inadvertent return". That really means "uncontrolled release" or "frac-out", If the cracks in the rock lead to the water table. the fluid will emerge in wells. streams. and wetlands. If the cracks lead to a sizeable cavern. drilling becomes impossible because all the fluid simply disappears into the cavern. What can a driller do when faced with drilling fluid flowing in unexpected directions? The only two solutions I've read.about are to back out the drill part way and resume drilling in a slightly different direction. in hopes that the new route will avoid the problem area: or else to inject "grout" (e.g. plaster or • something ·similar) into the area where drilling is occurring.J:t;, fill in the cracks .. It is not yet clear, to me at least, how the [ problem at Chester Creek will be circumvented. An Ohio spill that was really a "frac-out". In looking at the problems at Chester Creek, I am reminded of the "spill" of about 21 million gallons (!) of drilling fluid that recently devastated a wetlands area in Stark County, Ohio, on April 13-a few weeks i before the Judy Way/Chester Creek event. The same company that is building the Dragonpipe, Energy Transfer Partners, W'JS responsible for that problem, which occurred during horizontal drilling for the "Rover" natural gas pipeline. The Ohio event wasn1t a 11spil111 in the usual sense (a pipe failure or a valve left open in error). It was also an "inadvertent return" (frac-out) if which the company failed to notice until far too late that a vast amount of drilling fluid was surfacing. ETP had exactly the 1 same problem on a different section of the Rover pipeline (in Richland County, Ohio J on the very next day. There was an l "inadvertent return" of 50,000 gallons of drilling fluid. Two more frac-outs from Dragonpipe drilling. And now we learn th'lj' another "inadvertent return" from Dragonpipe drilling happened in Upper Uwchlan Township, north of Exton, on June 17, ! followed by another ( on a different stretch of Chester Creek, behind the Tunbridge Apartments in Middletown Township) f ݥ17. . I The lesson from the Ohio we.tlands incident is that drilling fluid, while non-toxic in small amounts, can still do a lot of damage in bulk. And an additional lesson, from Ohio and from our local problems, is that horizontal directional drilling is an imperfeft technology. Even when used exactly as intended, horizontal drilling technology can produce massive envii'onmental dama e and there is no way to anticipate where or when it will occur,
Rick Smith
From: Sent: To: Subject: Attachments:
FYI -----Original Message---- From: "David Reidinger"
mshane@eastgoshen.org
Monday, October 26, 2020 2:01 PM Rick Smith FW: Pipeline Information DER Pipeline 10202020.pdf
Sent: Monday, October 26, 2020 12:09pm To: "David Shuey" <dshuey@eastgoshen.org>, "Michele Truitt" <mtruitt@eastgoshen.org>, "Mike Lynch - BOS -- East Goshen Twp" <mlynch@eastgoshen.org>, "Marty Shane" <mshane@eastgoshen.org>, "John Hertzog" <jhertzog@eastgoshen.org>, "Jon Altshul" <jaltshul@eastgoshen.org>, carolinechughes2@gmail.com Subject: Pipeline Information
To the East Goshen Board of Supervisors and EGT Pipeline Task Force: My name is David Reidinger and I am a resident of East Goshen Township. Please consider the attached letter and my recommendation to act immediately to revoke the township permits and rights of Energy Transfer Partners/ Sunoco and its subsidiaries and contractors until recently uncovered and professionally certified dangerous geological conditions in the township can be credibly disproven or remediated. The safety of Township residents is at stake. Thank you for your consideration. I look forward to a response or action at the next Board of Supervisors meeting. Sincerely, David Reidinger 1605 Alcott Circle West Chester, PA 19380
1
David Reidinger
1605 Alcott Circle West Chester, PA 19380 East Goshen Township
10/25/2020
Chaitman E. Martin Shane East Goshen Township Board of Supervisors
1580 Paoli Pike West Chester, PA 19380
Dear Supervisors of East Goshen Township:
72cc__
JD - 0 .- o J-O
Thank you for considering this letter and your service to East Goshen Township over your different terms.
Like many of you, I was concerned when the Mariner East Pipeline construction started years ago and became even more concerned when the true nature of the material that passes through this new construction came to light.
I am confident we all share the goal of making sure that Mariner East is safe for East Goshen residents. I applaud you for the creation of the Pipeline Task Force two years ago. I have followed your interactions with the Task Force by video and in the minutes of your meeting for several years.
I was concerned but not surprised to learn of the whistleblower complaint alleging yet another dangerous hydrologic condition in the Township. I was stunned, however, in your response on the advice you are receiving from Township counsel. Factual foundation is, of course, the basic tenet of a rule of law and your quick action to interview the involved parties is noteworthy. However, there are a multitude of reasons that the whistleblower's legal remedies could fail that do not nullify his professional opinion. The ONLY fact that is relevant now is that a nationally and PA state-certified Geologist in due function of his official role for the pipeline identified and reported a serious safety issue at a jobsite in EGT and has fo1mally notified you of that knowledge. His credentials at the time are not invalidated by his current state of employment. That information, alone, supports any challenge to a temporary revocation of pe1mit rights until the condition can be disproven or remediated. Three years of a mosaic of similar situations is also supportive.
Temporarily restricting the Mariner East Pipeline is no different than EGT code enforcers or construction inspection professionals halting a job site for unsafe working conditions or building methods.
10/25/2020 Page2
While I generally applaud the candor of your BOS meetings, I was shocked to hear comments from Chairman Shane and others indicating that delay in action on this subject was about fear of legal challenge. No one challenged the veracity of the geology. Those comments on the public record seem to open the Township up to more vicarious legal liability than any quicker action on revoking permits should any unfortunate accident happen with the Pipeline. Supervisor Hertzog
also correctly stated that the Chester County Commissioners are equally responsible for acting on this problem on behalf of all Chester County residents. I have copied them on this letter.
As I began this letter, I appreciate your service to EGT. You have all pledged to serve this community with "fidelity." We should not be concerned with the difficulty of a task or its likelihood of challenge if you are faithfully acting to protect the safety of EGT residents. Indeed, failing to do so is malpractice.
I urge you to follow the clear recommendation of your Pipeline Task Force and vote immediately to temporarily revoke the appropriate permits of Sunoco / ETP while you continue your fact finding mission or until another PA agency can certify the safety of the disturbance. You already have the relevant data. Acting now will do no haim to Township residents. Failing or delaying to correct an unsafe condition in our community could be tragic.
I believe there is an opportunity for you to take action on this subject by the second week of November. I look forward to seeing your actions on this issue at the next BOS meeting.
Sincerely,
David Reidinger (610)-613-9353 email: davereidinger@gmail.com
cc:
Chester County Commissioner Marian Moskowitz Chester County Commissioner Josh Maxwell Chester County Commissioner Michele Kichline East Goshen Township Pipeline Task Force, Chair, Caroline Hughes
October 27, 2020
To:
From
Subject:
Mr. Rick Smith, Township Manager East Goshen Towns hip 1580 Paoli Pike West Chester, PA 19380-6199 ·
Scott Aharonian Supervisor Public Awareness and ROW Adelphia Gateway, LLC 214 Shoemaker Rd Pottstown, PA 19646 (610) 327-5331
Adelphia Gateway, LLC Valve Maintenance Project
Dear Mr. Smith, I wanted to confirm my voice mail message on October 27, 2020 regarding the upcoming Adelphia Gateway, LLC valve replacement work. As stated in my message, you will receive a more detailed construction start date notice from our team about two weeks prior to the start of.construction activities. The work consists of excavating the existing valve assembly, cutting it out and installing a new valve assembly. In the interim you may see our survey crews or project team members onsite as they finalize the plans. Enclosed you will find both Gary Warfield and my business cards should you have any questions or concerns about the upcoming work feel free to reach out to us.
Thank you for your consideration. Sincerely,
