Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
Annual Session 1-25-2022 draft 1
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Annual Planning Session Tuesday, January 25, 2022 The Board of Supervisors held their Annual Planning Session with the Township ABCs on Tuesday January 25, 2022 at 6:30 pm. Because of COVID-19 restrictions, only the person making the presentation could attend in person. Board of Supervisors present: Michele Truitt, Chairman; John Hertzog, Vice Chairman; David Shuey, Michael Lynch and Cody Bright. Township staff present: Dave Ware, Finance Director; Mark Miller, Director of Public Works; Mark Gordon, Zoning Officer; and Jason Lang, Director of Park and Recreation. Michele Truitt called the meeting to order at 6:30 pm and led the Pledge of Allegiance. She asked for a moment of silence to remember those who passed due to COVID, our police, fire fighters, EMS, and healthcare providers. She asked if anyone would be recording the meeting. There was no response. Michele explained the procedure for this meeting. Each ABC will have only one member present and that will be the presenter of their 2021 Accomplishments/2022 Goals report. 1. Historical Commission - Ted Roberts, Chairman, mentioned that in November a resident who owns the Price farm had a company come to do some work. In the process they found a ring, 1930 West Chester High School. It was inscribed with BEP. They reached out to the Historical Society and found out that the owner of the ring was Bertha Elizabeth Price. They were able to find her daughter Nancy and give her the ring. Ted showed a video of this process. Ted will be the Chairman of the Historical Commission for 2022. He reviewed their Accomplishments for 2021/Goals for 2022. (See the attached report.) Comments: Michele thanked him for volunteering which is very important. The BOS is considering combining some of the ABCs because of the amount of time involved in attending the meetings. She asked about ideas for more Christmas ornaments. Ted commented that they found that the ornaments sell best at holiday events. Michael commented about the number of meetings they held and the vacancies on the Commission. He suggested reaching out to owners of other historic properties. John pointed out how important the pdf files would be. He would like to see more photos. Michael commented that he couldn’t find anything in the Township records about the formation of the Historical Commission. Michele mentioned that Derek Davis is checking out when each ABC was formed. 2. Municipal Authority – Walter Wujcik, Chairman. Walter will be the Chairman for 2022. He acknowledged the other members of the Authority, and staff members and firms that help with the operation of the Ridley Creek Sewer Treatment Plant. He reviewed the 2021 Accomplishments/2022 Goals of the Authority. (See attached report)
Annual Session 1-25-2022 draft 2
Comments: Walter commented that the RCSTP treats about 750kg/d of sewage. Also, East Goshen is responsible for 1/6 of the sewage treated at the West Goshen STP. David Shuey commented about the upgrades at the Westtown Way PS and the meetings they had in order to negotiate the costs. Mark Miller gave more information about the new equipment that is needed. John spoke about the costs of the 2 current projects. Dave Ware mentioned how these costs will be covered. Michael commented that the Municipal Authority is to look over environmental issues. He mentioned the areas in the Township that still have on-site sewage treatment. The MA is having a sewer expansion study done for the BOS to review. Sewer rates were discussed. Walter mentioned that East Goshen is in the median for Chester County. Michele asked Walter to give an update in 2 months. 3. Park and Recreation Commission – Jason Lang Director of Park and Recreation. Jason mentioned that Dan Leicht was Chairman for the past 2 years. Debbie Snyder will be the new Chairman and Eric Tobin will be the Vice Chairman. He reviewed the 2021 Accomplishments/2022 Goals report. (See attached report) Comments: Jason spoke about the huge success of the Toy collection they had this Christmas. He also told everyone to mark August 15th on their 2022 calendar. There will be a big surprise at the East Goshen Park. It will be the coolest thing ever!!!!! John mentioned that he feels we don’t serve the residents in the southern part of the Township. There is a small park there. Michele feels we need to do more for children with disabilities. Jason mentioned that there is a bench in the back of the meeting room. It was made from plastic bags and will be placed in the park. 4. Pipeline Task Force – Bill Wegemann, Vice Chairman. Bill commented that he is not “pro” or “anti” pipeline. He reviewed their 2021 Accomplishments/2022 Goals. (See attached report) Comments: Bill mentioned that #5 under 2021 Accomplishments after 6 months of investigation everything is ok. And under #8, he thanked the Planning Commission for all of the assistance they gave. Bill pointed out that Michele Truitt went to Houston Texas to meet with pipeline representatives. Michele spoke about her visit. Bill thanked Christina and Caroline for their work on ordinances. He mentioned that there is no organization to oversee pipeline actions. Emergency services is very important. An evacuation plan is a must. Michael mentioned that all of their goals have safety in common.
Annual Session 1-25-2022 draft 3
4. Planning Commission – John Stipe, Vice Chairman. John reviewed the Commission’s 2021 Accomplishments and 2022 Goals report. (See attached report) Comments: Michele will review the Comprehensive Plan Objectives for the Planning Commission. 5. Sustainability Advisory Commission – Christi Supple, Chairman. Christi mentioned that the SAC helps maintain the environment. She spoke about all the members and the work they have done. She reviewed their 2021 Accomplishments/2022 Goals report. (See attached report) Comments: Christi mentioned that they collected 500 lbs. of plastic which was used to make the bench Jason mentioned to be added for seating in the park. She showed a green bag with the SAC logo on it made from recycled materials. She reminded everyone that they will be holding a Sustainability Expo in late April. She mentioned the groups that the members worked with. Michele spoke about recycling metal pieces. Christi mentioned that they may rename the Commission to the Environmental Advisory Commission. Cody commented that he liked the “What I can and can’t Recycle” game. He also wants to get a lidded recycle bin. Christi mentioned that there is a grant of 90% to help with the cost of lidded bins. 6. Conservancy Board – Sandy Snyder, Chairman. Sandy mentioned that she has been a member of the Conservancy Board for 14 years. She thanked Mark Miller, Jason Lang, and Mark Gordon for all of the support they give to the board. The Board couldn’t do what they do without them. Sandy reviewed their 2021 Accomplishments/2022 Goals report. (See attached report). Comments: Sandy mentioned that the 2021 Keep East Goshen Beautiful Day was the best ever!! She thinks people wanted to get out of their houses. She spoke about doing KEGBD more than once a year. There was discussion about the Blue Bird Houses in the park. Sandy commented that in early March they are cleaned out. Also, there are bat houses in the park which are important with the control of mosquitoes. David mentioned that there is a place in Vt where 100 Blue Bird houses are painted different bright colors. Regarding the Tree City USA designation, Sandy commented that the Conservancy Board will do anything that is required to obtain this designation. Mark Gordon mentioned that he identified 5 areas along the Paoli Pike Trail for trees. He also spoke about the Willistown Conservancy Trust which is doing water studies of the streams and filling riparian buffers. He recommends contacting them when buffer work needs to be done.
Annual Session 1-25-2022 draft 4
7. Futurists Committee – Thomas Kilburn, Chairman – Tom acknowledged the Township staff particularly Dave Ware and Susan D’Amore for their help. He reviewed their 2021 Accomplishments/2022 Goals report. (See attached report) Comments: Tom spoke about the resident survey and acknowledged Michele’s suggestion a few years ago. David mentioned that Willistown did a survey and got a 40% response. How can we improve the response? Tom commented that we would probably get a better response if we mail the survey to the residents. There was discussion about doing a paper newsletter. Adjournment There being no further business John moved to adjourn the meeting. Michael seconded the motion. The meeting was adjourned at 9:15 pm. Respectfully submitted, Ruth Kiefer, Recording Secretary
ACCCOMPLISHMENT:
EAST GOSHEN TOWNSHIP HISTORICAL COMMISSION MEETING
- The main accomplishment for 2021 is review of the Malvern Institute plan.
GOALS
- Get back to 7 members and help Ed present his properties history to Chester County.
HC 12-9-21 draft 1
East Goshen Municipal Authority
• Authority Members
o Walter Wujcik, Chairman 2025 o Kevin Cummings, Vice Chairman 2026 o Phil Mayer, Treasurer 2024 o Dana Pizarro, Secretary 2026 o Jack Yahraes, Assistant Secretary/Treasurer 2023 o Mark Miller, Public Works Director o Mike Lynch, BOS Liaison o David Ware, Staff Liaison o Pennoni Associates (Michael Ellis), Engineer o Patrick M. McKenna, Esq. (Robert Jefferson, Esq.) - Gawthrop Greenwood o Maillie -Accounting Firm o Big Fish Environmental (Scott Towler)- RCSTP O&M
• The Municipal Authority, which is a legally separate entity from the Township, is responsible for financing the construction, expansion, monitoring, and upgrade of the Township's sewage collection and treatment infrastructure • Beginning in 2019, all sewer capital purchases are made through the Municipal Authority, with transfers from the Sewer Operating Fund for both general operating costs and new capital assets and from the Sewer Capital Reserve for replacement capital assets. Previously, only the MA's operating costs and selected capital expenses were borne by the Municipal Authority.
• 2021 GOALS AND ACCOMPLISHMENTS
o Continue to monitor the upgrades at West Goshen Sewer Treatment Plant (STP). Members to attend West Goshen Sewer Authority (WGSA) meetings. MA members attended most meetings. Monitoring of EGT share by Finance Directors. Original EGT share estimated at $4.2 million of total construction cost estimate (CCE) of $25.5 million from April 2017. Current EGT share is $5.4 million (includes a 10% contingency) of total construction cost estimate (CCE) of $26.7 million. Change orders on the headworks, anaerobic digester, chemical, phosphorus removal treatment units drove most of the construction cost increase.
o Continue to monitor the upgrades at Westtown Way Pumping Station - EGT share initially estimated at $1.17 million of total construction cost estimate (CCE) of $2.16
EAST GOSHEN MUNICIPAL AUTHORITY January 25, 2022
million in April 2017. Significant ongoing monitoring of design and construction cost estimates undertaken in 2021. Upgrades will completely replace all mechanical, electrical, instrumentation and HVAC from original construction in the late 1970s. In
March 2021, an updated total CCE of $3.67 million provided by WGSA with EGT share at $2.00 million. A series of face-to-face meetings involving the MA members, the Director of Public Works, Pennoni engineers, the Finance Directors, and Township Managers with WGSA members and staff occurred between March and July. A value-engineered solution with a new total CCE of $2.71 million, with an EGT share of $1.49 million was reached in July 2021. The low bid of $2.52 million was accepted in October 2021; EGT share at $1.38 million; EGT budgeting 10% for potential change orders. Grant funding was pursued in parallel to these efforts, but these efforts were not successful. Estimated EGT share of WGSA construction administration and inspection is estimated at $55,000.
• The Supervisors have allocated $914,000 of American Rescue Plan Act (ARPA) funds received to this project.
o Continue to implement the Inflow & Infiltration (l&I) Plan for the Sewer System - on-going
• Asset Management Program / Indicator of Pipe Structural issues/ Ridley Creek & Chester Creek systems
• Public Works provided 3,970 man-hours of service to MA • Completed 80,400 feet of cleaning and televising • Significant repairs to remove 75,000 to 100,000 gallons of Inflow/ Infiltration (l&I)
o Continue to operate the Sewer Treatment Plant in compliance with PADEP permit requirements - MET MONTHLY PERMIT REQUIREMENTS ALL YEAR.
o Hershey Mill Estates Trunk Sewer Replacement - Emergency
• Field Investigations Completed -Topographic and property boundary surveys; wetland delineation and bog turtle investigation reports; geotechnical programs; TV inspections of piping; and manhole inspections. • Permit Applications for Construction - Obtained USFWS clearance for "no impacts to bog turtles" and no time of year work restrictions; conducted waterway impact permit pre-application meeting with PADEP and USACE; planning to submit General Permit GP-11 "Water Encroachments" permit application to DEP in January. • Construction Bid documents 95% complete; anticipate bidding in mid spring 2022 upon receipt of necessary permits; targeting construction in summer 2022.
2
EAST GOSHEN MUNICIPAL AUTHORITY January 25, 2022
• The Supervisors have allocated $950,000 of American Rescue Plan Act (ARPA) funds received to this project, which has a projected construction cost of $1,456,000.
o Implement Planned Projects Program
• Ridley Creek Sewer Treatment Plant
• Caustic Soda Project to improve worker safety and efficiency at the plant. - $37,000; [Total cost $190,000; Received $153,000 DCED grant]; Anticipated start date was Spring 2021. Deferred pending system modifications required by chemical supplier. Final plans completed and out for pricing. • Influent Flow Meter Replacement - $42,000, Study and design have been completed, and vendor quotes were obtained in summer 2021.
• Filter Feed Pump - $18,000 deferral from 2020
• Pump Stations
• Hunt Country Pump Station Mag Meter - $15,000 deferral from 2019 - deferred for potential grant funding • Hunt County Pump Station Muffin Monster - $67,000 deferral from 2019 -deferred for potential grant funding • Hunt Country Pump Station Bypass Pump Connection- $5,000 carryover from 2019 - deferred for potential grant funding
• Sewer System-
• Three (3) New Ridley Creek Collection System Permanent Flow
Meters - deferral from 2019
o Hibberd Lane Meter - construction completed and online.
o Other 2 meters ($40,000 each) - deferred to 2022 and 2023
o Other Items of Note
• UV Disinfection System Replacement - Critical Need
• Existing system replacement UV bulbs are not available since the installed proprietary system is no longer manufactured. System was installed in 2010. • Investigation of alternate systems was undertaken regarding scoping, and approach to maintenance of disinfection process during construction, pricing, contractual terms and field visits to other STP installations. Three vendors provided initial cost quotes and designs; currently awaiting supplemental electrician installation quotes.
3
EAST GOSHEN MUNICIPAL AUTHORITY January 25, 2022
Replacement cost is projected to be $125,000 to $250,000. Current budget amount is $125,000. Costs above $125,000 to be covered by the transfer from Sewer Capital funds. • Sewer Extension Study
• Discussion of sewer extensions to areas served by on-lot disposal systems {OLDS) deferred from June 2020. At that time, open grants with 50% match through PA DCEDs Sewage Facility Program for Act 537 Planning were available. Last Act 537 update was 2007.
• Adopted 2015 Comprehensive Plan - Utilities Plan identified the strategy of the MA to maintain its role in evaluating unsewered areas. • A limited study was completed in November 2021 for public sewer extension to unsewered areas with opinions of probable costs for consideration by the MA and subject property owners.
• Guidance - Estimated OLDS replacement system costs have been significantly increasing to the $30,000 to $40,000 range. • NPDES Permit Renewal-Application submitted to PADEP in November 2021. Comprehensive influent and effluent sampling conducted. • Supplee Valley Sewer Pipe Lining - estimated $250,000 - funding through
$130,000 deferral from 2021 and $130,000 allocation for 2022; study and scoping have been completed. Bid documents will be prepared in 2022.
• 2022 GOALS
o Continue to monitor the Close-out of the West Goshen Sewer Treatment Plant (STP) Upgrades. Members to attend West Goshen Sewer Authority {WGSA) meetings as necessary.
o Continue to monitor the Westtown Way Pumping Station Improvements Project. Members to attend West Goshen Sewer Authority {WGSA) meetings as necessary.
o Continue to implement the Inflow & Infiltration (l&I) Plan for the Sewer System - on-going
• Asset Management Program / Indicator of Pipe Structural issues/ Ridley Creek & Chester Creek systems
• In concert with Public Works Cleaning & Televising
o Continue to operate the Ridley Creek Sewer Treatment Plant in compliance with PADEP permit requirements
4
EAST GOSHEN MUNICIPAL AUTHORITY January 25, 2022
o Sewer Extension Study
• Based on further interest of BOS, further evaluate current costs for OLDS replacement system costs with contractor and homeowner input and potential grant or funding sources. • Conduct survey of subject property owners in OLDS areas regarding level of interest and any recent OLDS installation costs.
o Hershey Mill Estates Trunk Sewer Replacement - $1,456,000
• Permit Applications for Construction - Pending agency permit issuance. • Complete Construction Bid documents; anticipate bidding in mid- spring 2022 upon receipt of necessary permits; targeting construction in summer 2022.
o Implement Planned Projects Program
• Ridley Creek Sewer Treatment Plant (RCSTP)
• UV System Replacement - $125,000
• Caustic Soda Project to improve worker safety and efficiency at the plant. - $37,000; [$190,000; Received $153,000 DCED grant]; • Influent Flow Meter - $42,000
• Filter Feed Pump (Centrifuge Rebuild) - $18,000 deferral from 2020 • Pump Stations
• Hunt Country Pump Station Bypass Pump Connection- $5,000 carryover from 2019
• Hunt Country Pump Station Mag Meter - $15,000 deferral from 2019 - deferred for potential grant funding
• Hunt County Pump Station Muffin Monster - $67,000 deferral from 2019 -deferred for potential grant funding • Sewer System-
• Two (2) New Ridley Creek Collection System Permanent Flow Meters to assess 1&1- deferral from 2019
o Line Road and Blacksmith Shop meters ($40,000 each) - one in 2022 and one in 2023
o Supplee Valley Sewer Pipe Lining- estimated $250,000-funding through $130,000 deferral from 2021 and $130,000 allocation for 2022; Bid documents will be prepared in 2022.
5
2022 ABC Kickoff Meeting - Park Commission
2022 Goals
⇒Stay flexible and connected to the community through pandemic proof programming.
⇒On board new Recreation Program Coordinator successfully
Support current programs, identify targets of opportunity (senior, toddler,
weekend)
⇒Implement plan for 2022 Full Day summer camp program at East Goshen
Elementary (PROS).
⇒Offer nature focused programming-EGT Young Beekeepers and
Nature Warriors programs (PROS).
⇒Fellow ABCs-consider yourself challenged at this year's Pumpkin
Festival!!!
⇒Explore idea to bring back farmers market in some capacity
⇒Add wind screens and center divider to pickle ball
⇒Create Stones league
2021 Accomplishments
• Hosted all EGTPR traditional programs with pandemic safety measures in place
• Bees by the Blacksmith Shop opened in partnership with Bellingham, Carmen B's Honey and received $2,500 Keep PA Beautiful for youth/adult bee education
• Partnered with WCU to host Carnival of Ruin
• Partnered with Chesco Art Assoc to host inaugural Art Walk
• Teen Filmmakers Showcase had 2500 global submissions, hosts 19 local teen filmmakers and family and Movie Tavern Exton
• 2021 camp program ~ 400 slots sold out in two days
• Strengthened relationship with Friends of East Goshen-Reindeer meet and greet smash success
• Introduced ABCs to Township residents via pop up Toddler Trick or Treat
• Named NRPA Gold Medal Finalist community again, first in Pennsylvania.
East Goshen Township Pipeline Task Force
2021 Accomplishments
1. Redefined Pipeline Task Force Purpose and Mission Statement.
2. Achieved full staffing of Task Force with seven members.
3. Established liaisons with other East Goshen Township ABCs.
4. Continued outreach and relationship building with State Representative Dianne Herrin and State Senator Carolyn Comitta.
5. Investigated HOD 521 Subsidence utilizing a professional geologist (Dr. Ira Sasowsky).
6. Provided detailed comments for 2020 - 2021 Chester County Hazard Mitigation Plan, specifically for the Vulnerability Assessment of Hazardous Liquid and Gas Pipelines.
7. Reviewed and provided explanation of Bow Tree site surface water testing results. In conjunction with this effort, also reviewed Willistown Conservation Trust Water Sampling Program.
8. Provided input to requirements for Pipeline Awareness Study regarding zoning ordinance.
9. Provided questions regarding modifications at Adelphia valve station on Paoli Pike.
10. Provided input regarding Boot Road pump station leak.
11. Provided questions for Sunoco regarding their pipeline maintenance on Line Road.
12. Jointly with the Board of Supervisors, composed and sent a letter (dated 8/27/21) to the Pennsylvania PUC sharing concerns that aligned with the Chester County Commissioners and requested immediate shut down of the Sunoco pipeline.
East Goshen Township Pipeline Task Force
2022 Goals
1. Explore development of an East Goshen Township specific hazard mitigation plan for pipelines.
2. Increase communication to residents regarding evacuation and notification plans for pipeline emergencies.
3. Continue monitoring activities of all eleven (11) active pipelines in East Goshen Township.
4. Coordinate meetings with East Goshen Township's Emergency Management Coordinator (EMC) and review the role of EMC and the relationship to Natural Gas Liquid (NGL) pipeline safety.
5. Contribute to the East Goshen Township quarterly newsletter with information in easy-to understand formats for the public.
6. Attend the monthly Chester County Sunshine meetings.
7. Revisit East Goshen Noise and Public Nuisance ordinances.
8. Fill vacancies on task force to achieve full staff of seven (7).
9. Explore a specific pipeline emergency evacuation plan for the Township. Provide input to development of this plan as appropriate.
East Goshen Township Planning Commission. Report on 2021 goals and proposed 2022 goals
Planning Commission significant accomplishments for 2021:
• Completed Pipeline Awareness Study Ordinance. • Reviewed Variance for 198 Oneida Ln • Reviewed Variance for 1365 Enterprise Drive • Reviewed Variance for Albert and Lynn Greto • Reviewed Variance for ESKE Development LLC • Reviewed Variance for 14 Reservoir Rd/Glossen • Reviewed Variance for Imperial Marble, 1311 West Chester Pike • Completed and Reviewed Ordinance for Small Wireless Facilities
January 25, 2022
• Supported the Business Park Task Force with Planning Commission representation
Planning Commission Goals for 2022:
• Continue to support the Board of Supervisors (BOS) with implementation of the following Comprehensive Plan objectives:
o Objective 9.1 Maintaining and expanding the Open Space, Recreation, and Trails Network o Objective 9.2 Developing the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen, from West Goshen to Willistown .. o Objective 7.2 Promote the enhancement of business opportunities along the West Chester Pike Corridor. - Begin High Level Discussions. • Request the Board of Supervisors provide the Planning Commission with direction on how to move forward with Comprehensive Plan Objective 6.3: Transforming the West Chester Pike Corridor into a more Functional and attractive artery. • The Planning Commission has completed and submitted to the BOS a Traditional Neighborhood Development (TND) Overlay Ordinance for the Paoli Pike Corridor (Comp
Plan Objective 6.2). The Planning Commission shall support implementation of this TND Ordinance when approved. • Support BOS request to review existing township Zoning Ordinances for possible revision and updates. The Planning Commission shall focus on the remaining districts . • • Review Business Park Task Force Report to identify any possible Planning Commission Action Items.
The Planning Commission requests that the Board of Supervisors communicate their 2022 goal priorities to the Planning commission.
F:\Data\Shared Data\Agendas\Board of Supervisors\2022\Annual Planning Session 2022\2022 PC goals 01062022 ejh edit.docx
Outline for SAC Annual Report for 2022
Projects accomplished in 2021:
1. Installation of Trex bins to collect plastic bags and film 2. Distribution of lidded bins for Trash collection 3. Survey for residents regarding their current sustainable practices 4. Participation in East Goshen Community Day and Pumpkin Festival 5. Participation in COG Clean Energy Future Committee 6. Participation in multi-Township Energy Transition project 7. Participation in Chester County Environmental Alliance 8. Recycling of crayons and markers - collected approx. 80 lbs. 9. Approval and order of shopping bags to replace single use plastic ones 10. Analysis of waste management data
Projects initiated in 2021:
1. Sustainability Expo at Township building 2. After survey results, design a program of interviews with local businesses to help them with sustainable practices 3. East Goshen Sustainable Businesses awards and promotion 4. Review of local and regional ordinances on sustainable issues
Projects contemplated in 2022:
1. Sustainability Expo in late April
2. Additional seminars for residents 3. Wider distribution of lidded bins 4. Distribution of ordered shopping bags and approval for more 5. Research on glass and large metal items for recycling 6. Recommendation for changes to passive side of Park adjacent to Ridley Creek 7. Support for installation of car chargers in Shopping Center near Hershey's Mill, and recommendation for additional installs 8. Consideration of additional recommendations by COG Green Energy Committee 9. Solicitation of incubator sponsor for start-up green technologies and services to locate in East Goshen
East Goshen Conservancy Board
Mission Statement
Protect and nurture East Goshen's natural resources and educate East Goshen citizens of their importance.
2021 Accomplishments
1. Managed a successful Keep East Goshen Beautiful Day on April 17, 2021. 2. Continued maintenance of blue bird houses in Applebrook Park 3. Continued maintenance of Clymer's Woods - Three trees were replaced and reapplied wood chips around the trees (November 12, 2021 and December 2021). 4. Worked on Tree City USA application with Mark Gordon. 5. Liaison with the Willistown Conservation Trust.
2022 Goals
1. Manage a successful Keep East Goshen Beautiful Day - tentative date - April 23, 2022 (rain date -April 30, 2022). 2. Continue maintenance of blue bird houses in Applebrook Park. 3. Continue maintaining Clymer's Woods - replacing dead trees and reapplying wood chips around the trees. 4. Maintain the riparian buffer along the creeks. Plan for a large-scale planting event at Reservoir Road and Strasburg Road in October 2022. 5. Continue control of invasive plant species. 6. Continue to support Mark Gordon in the preparation of the East Goshen application for Tree City USA. 7. Continue assisting with the pond restoration projects as needed. 8. Continue pursuing joint events with the Willistown Conservation Trust. 9. Plan Arbor Day event.
East Goshen Futurists Committee
2021 Accomplishments 1. Completed first digital resident survey- Brandon Groff o Excellent response - 600+ responses representative of a cross section of EGT o Key survey results showed: • High degree of resident connection to their community • Residents rated EGT strong in following areas: • Overall quality of life • Feeling of safety • Quality of parks and recreational programs for all ages • Quantity and quality of green space
2. Led Business Park Task Force with Futurist Committee represented by Jeff O'Donnell, Chair and Brian Sweet
o Results reported to BOS end of 2021
2022 Goals 1. Complete a follow up survey on three focus areas: o Future interest in adding neighborhood feeder trails to tie into the Paoli Pike Trail o Future interest in maintaining current level of green space o Future interest in adding streetlights and banners, trees and a gathering area along Paoli Pike between CVS and Wawa 2. Develop recommendations to the BOS based on survey results 3. Develop other mechanisms, one example would be focus groups, for resident feedback on key EGT initiatives 4. Develop and propose new ideas to help transform the West Chester Pike and Paoli Pike business corridors into more functional and attractive arteries.