Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
East Goshen Township
2024 Proposed General Fund Budget
November 14, 2023
[Seal: TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, INCORPORATED 1817]
1
PROPOSED REVENUE & EXPENSE CHANGES
(from Preliminary to Proposed)
- As discussions with Thornbury Township continue regarding contracted WEGO services and the cost, we propose an Interfund Operating Transfer from existing General Fund balance of $444K to offset the potential expected shortfall if Thornbury does not sign a contract.
- The remaining revenue items were discussed at the 10/17 BoS meeting except for an increase in expected State Pension Aid; new number based upon actual 2023.
- Increased WEGO expense as noted above.
- Goshen Fire Company contribution 10% above 2023.
- Good Fellowship Ambulance & EMS Training Institute contribution 16% above 2023.
- Malvern Fire Company contribution 3% above 2023.
- Includes updated/reviewed staff payroll and positions.
- Increased SPCA costs based on new contract.
- ABC’s budgets set per BoS discussion 10/17.
- Numerous internal expense line item decreases after review 10/17 in order to return 2024 Proposed General Fund Budget to a Net Zero, neither surplus nor deficit.
Revenue Changes
| Amount | Description |
|---|---|
| $ 444,000.00 | Interfund Operating Transfer (from General to cover WEGO) |
| $ 35,000.00 | Interest Income |
| $ 20,000.00 | Pension State Aid Revenue |
| $ 15,000.00 | Permit Fee Revenue |
| $ 12,000.00 | Liquid Fuel Interest Income |
| $ (15,000.00) | County Real Estate Processing Fees |
| $ (10,000.00) | Cable Franchise Fees |
| $501,000.00 | Subtotal Revenue |
Expense Changes
| Amount | Description |
|---|---|
| $ 515,903.22 | WEGO Increase |
| $ 41,788.29 | Goshen Fire Contribution/Fire Alarm pass back |
| $ 24,711.53 | Final Staff Salaries & Personnel hires |
| $ 18,600.00 | New S.P.C.A. contract |
| $ 15,000.00 | Futurist Bow Tree Connection Surveys |
| $ (15,000.00) | Paving materials |
| $ (13,125.00) | Stormwater Equip Rental |
| $ (10,000.00) | Paving rental |
| $ (10,000.00) | General Tree Removal |
| $ (10,000.00) | Tree Removal Park |
| $ (8,579.22) | General Expense - Shop |
| $ (7,500.00) | Eliminate 3rd Party Inspectors |
| $ (7,000.00) | Twp. Bldg. - Fuel, light, water |
| $ (5,000.00) | Twp Bldg - Maintenance & Repairs |
| $ (5,000.00) | Communication Expense - no Bee.Net |
| $ (5,000.00) | EIT Commission |
| $ (4,298.82) | Minor Equipment Purchase |
| $ (3,000.00) | Shop - Tools |
| $ (2,500.00) | Legal - Zoning Hearing Board |
| $ (2,500.00) | Park Utilities |
| $ (2,500.00) | Satellite Park Improvement (Ponds) - now InfraFund |
| $ (2,000.00) | Public Works support Community Day |
| $ (2,000.00) | Proportional reduction of ABC Budgets |
| $501,000.00 | Subtotal Expense |
| $ 0.00 | Net |
2
General Fund: Revenues, Expenditures & Ending Fund Balance
Bar chart comparing Revenue, Expenditure, Ending Fund Balance, and Surplus/(Deficit) across 2021 Actual, 2022 Actual, 2023 Budget, 2023 Projection, and 2024 Budget, with a vertical scale from $- to $14,000,000 in $1,000,000 increments ($14,000,000; $13,000,000; $12,000,000; $11,000,000; $10,000,000; $9,000,000; $8,000,000; $7,000,000; $6,000,000; $5,000,000; $4,000,000; $3,000,000; $2,000,000; $1,000,000; $-).
| YEAR | REVENUE | EXPENDITURE | ENDING FUND BALANCE | SURPLUS/ (DEFICIT) |
|---|---|---|---|---|
| 2021 Actual | $11,453,479 | $ 11,389,421 | $ 5,739,288 | $ 64,058 |
| 2022 Actual | $11,987,004 | $ 11,901,916 | $ 5,829,155 | $ 89,867 |
| 2023 Budget | $12,278,669 | $ 12,278,669 | $ 5,829,155 | $ - |
| 2023 Projection | $12,990,547 | $ 12,665,307 | $ 6,154,395 | $ 325,240 |
| 2024 Budget | $13,229,833 | $ 13,229,833 | $ 6,154,395 | $ - |
2024 Proposed Budget is Net Zero, neither a surplus nor deficit.
3
2024 Proposed General Fund Budget Summary
| Category | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | Prop Budget 24 vs 23 Proj | Prop Budget 24 vs 23 Proj | Prop Budget 24 vs Budget 23 | Prop Budget 24 vs Budget 23 |
|---|---|---|---|---|---|---|---|---|---|
| REVENUES | |||||||||
| LOCAL ENABLING TAXES | 8,984,667 | 8,995,035 | 9,559,000 | 9,667,424 | 9,643,000 | (24,424) | -0.3% | 84,000 | 0.9% |
| LICENSE & PERMITS | 440,810 | 425,554 | 441,099 | 411,355 | 403,400 | (7,955) | -1.9% | (37,699) | -8.5% |
| FINES | 45,121 | 69,505 | 50,000 | 43,194 | 45,500 | 2,306 | 5.3% | (4,500) | -9.0% |
| INTEREST EARNINGS | 2,750 | 102,835 | 165,759 | 309,075 | 275,000 | (34,075) | -11.0% | 109,241 | 65.9% |
| RENTS | 101,273 | 103,066 | 104,898 | 105,846 | 106,764 | 918 | 0.9% | 1,866 | 1.8% |
| STATE SHARED REVENUE & ENTITLEMENT | 132,289 | 134,604 | 136,250 | 161,508 | 158,650 | (2,858) | -1.8% | 22,400 | 16.4% |
| GENERAL GOVERNMENT | 29,563 | 33,517 | 26,000 | 49,130 | 34,000 | (15,130) | -30.8% | 8,000 | 30.8% |
| PUBLIC SAFETY | 338,687 | 485,063 | 356,200 | 487,652 | 436,092 | (51,560) | -10.6% | 79,892 | 22.4% |
| HIGHWAY & STREETS | 6,452 | 1,045 | 1,943 | 1,529 | 2,000 | 471 | 30.8% | 57 | 2.9% |
| CULTURE & RECREATION | 145,109 | 182,721 | 202,362 | 244,637 | 261,720 | 17,083 | 7.0% | 59,358 | 29.3% |
| MISCELLANEOUS REVENUE | 162,702 | 291,531 | 138,157 | 225,998 | 137,707 | (88,290) | -39.1% | (450) | -0.3% |
| INTERFUND OPERATING TRANSFERS | 1,064,056 | 1,162,528 | 1,097,000 | 1,283,199 | 1,726,000 | 442,801 | 34.5% | 629,000 | 57.3% |
| TOTAL REVENUES | 11,453,479 | 11,987,004 | 12,278,669 | 12,990,547 | 13,229,833 | 239,286 | 1.8% | 951,165 | 7.7% |
| EXPENSES | |||||||||
| GENERAL GOVERNMENT | 979,121 | 1,071,816 | 1,106,340 | 1,222,487 | 1,141,680 | (80,807) | -6.6% | 35,339 | 3.2% |
| TAX COLLECTION | 119,639 | 119,098 | 120,129 | 113,782 | 120,385 | 6,602 | 5.8% | 256 | 0.2% |
| GENERAL GOVERNMENT BLDG & PLANT | 451,488 | 599,940 | 319,223 | 379,588 | 296,593 | (82,995) | -21.9% | (22,630) | -7.1% |
| PUBLIC SAFETY | 4,444,762 | 4,682,436 | 5,120,946 | 5,082,731 | 5,955,420 | 872,689 | 17.2% | 834,474 | 16.3% |
| PLANNING & ZONING | 395,445 | 373,157 | 384,900 | 391,628 | 431,840 | 40,212 | 10.3% | 46,940 | 12.2% |
| RECYCLING | 13,760 | 15,912 | 17,000 | 16,189 | 20,378 | 4,189 | 25.9% | 3,378 | 19.9% |
| PUBLIC WORKS - SANITATION | 469,210 | 351,289 | 353,982 | 476,009 | 528,709 | 52,701 | 11.1% | 174,727 | 49.4% |
| PUBLIC WORKS - HWYS ROADS & STREETS | 1,812,565 | 2,045,762 | 2,114,784 | 2,302,295 | 2,081,715 | (220,581) | -9.6% | (33,069) | -1.6% |
| PARTICIPANT RECREATION | 215,389 | 296,126 | 324,360 | 381,697 | 389,947 | 8,250 | 2.2% | 65,587 | 20.2% |
| PARKS | 304,147 | 410,528 | 708,086 | 517,499 | 521,483 | 3,984 | 0.8% | (186,603) | -26.4% |
| CONSERVATION & DEVELOPMENT | 471 | 2,241 | 4,000 | 4,086 | 3,189 | (897) | -21.9% | (811) | -20.3% |
| HISTORICAL | 914 | 2,328 | 3,300 | 3,524 | 911 | (2,613) | -74.1% | (2,389) | -72.4% |
| DEBT SERVICE | 576,090 | 550,077 | 548,789 | 549,405 | 461,400 | (88,005) | -16.0% | (87,389) | -15.9% |
| PENSION FUND CONTRIBUTION | 136,373 | 132,827 | 141,100 | 148,345 | 158,700 | 10,355 | 7.0% | 17,600 | 12.5% |
| INSURANCE PREMIUMS | 701,393 | 573,834 | 750,959 | 812,981 | 830,720 | 17,739 | 2.2% | 79,761 | 10.6% |
| EMPLOYEE BENEFITS | 213,833 | 223,966 | 260,770 | 263,059 | 286,764 | 23,705 | 9.0% | 25,994 | 10.0% |
| INTERFUND TRANSFERS | 554,822 | 450,580 | 0 | 0 | 0 | 0 | 0 | ||
| TOTAL EXPENSES | 11,389,421 | 11,901,916 | 12,278,669 | 12,665,307 | 13,229,833 | 564,527 | 4.5% | 951,165 | 7.7% |
| NET RESULTS FROM OPERATIONS | 64,058 | 85,088 | 0 | 325,240 | 0 |
- When excluding Public Safety Expenses, the 2024 Proposed GF Budget expenses are 4.1% lower than Projected 2023 and 1.6% higher than Approved 2023 Budget.
4
TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817
EAST GOSHEN TOWNSHIP
Proposed 2024 Budget Detail
Variance Detail Report
GENERAL FUND
| REVENUES | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud |
|---|---|---|---|---|---|---|---|---|---|
| LOCAL ENABLING TAXES | |||||||||
| R.E.PROPERTY TAX | 2,056,560 | 1,999,785 | 2,831,000 | 2,872,363 | 2,850,000 | (22,363) | -0.8% | 19,000 | 0.7% |
| PROPERTY TAX - LIEN REVENUE | 10,965 | 30,622 | 0 | 26,331 | 0 | (26,331) | -100.0% | 0 | |
| PROPERTY TAX - INTERIM | 671 | 5,872 | 0 | 2,077 | 0 | (2,077) | -100.0% | 0 | |
| PROPERTY TAX - DISCOUNT | (38,031) | (37,203) | 0 | (53,027) | 0 | 53,027 | -100.0% | 0 | |
| REAL ESTATE TRANSFER TAX | 963,967 | 855,863 | 800,000 | 643,824 | 720,000 | 76,176 | 11.8% | (80,000) | -10.0% |
| EARNED INCOME TAXES | 5,736,165 | 5,875,677 | 5,600,000 | 5,937,653 | 5,750,000 | (187,653) | -3.2% | 150,000 | 2.7% |
| LOCAL SERVICES TAX REVENUE | 352,254 | 351,685 | 340,000 | 342,657 | 350,000 | 7,343 | 2.1% | 10,000 | 2.9% |
| PROPERTY TAX - PENALTY | 6,379 | 5,269 | 0 | 4,658 | 0 | (4,658) | -100.0% | 0 | |
| LST TAX - REFUND | (73) | (97) | 0 | (235) | 0 | 235 | -100.0% | 0 | |
| EIT REFUNDS | (104,189) | (80,185) | 0 | (96,570) | 0 | 96,570 | -100.0% | 0 | |
| PROPERTY TAX FEES | 0 | (12,252) | (12,000) | (12,308) | (27,000) | (14,692) | 119.4% | (15,000) | 125.0% |
| LOCAL ENABLING TAXES | 8,984,667 | 8,995,035 | 9,559,000 | 9,667,424 | 9,643,000 | (24,424) | -0.3% | 84,000 | 0.9% |
| LICENSE & PERMITS | |||||||||
| CABLE TELEVIS.FRANCHISE | 420,394 | 407,679 | 429,099 | 401,397 | 395,000 | (6,397) | -1.6% | (34,099) | -7.9% |
| CROWN CASTLE FRANCHISE FEE | 4,346 | 4,295 | 4,000 | 4,381 | 4,400 | 19 | 0.4% | 400 | 10.0% |
| STREET ENCROACH. PERMITS | 16,070 | 13,580 | 8,000 | 5,577 | 4,000 | (1,577) | -28.3% | (4,000) | -50.0% |
| LICENSE & PERMITS | 440,810 | 425,554 | 441,099 | 411,355 | 403,400 | (7,955) | -1.9% | (37,699) | -8.5% |
| FINES | |||||||||
| DISTRICT COURT FINES | 12,996 | 10,983 | 12,500 | 16,605 | 15,000 | (1,605) | -9.7% | 2,500 | 20.0% |
| VEHICLE CODE VIOLATIONS,STATE FINES | 7,107 | 7,144 | 8,000 | 7,477 | 5,500 | (1,977) | -26.4% | (2,500) | -31.3% |
| EAST GOSHEN TWP FINES | 7,418 | 4,833 | 8,000 | 4,365 | 5,000 | 635 | 14.6% | (3,000) | -37.5% |
| ZONING - CIVIL VIOLATIONS | 1,400 | 20,024 | 500 | 947 | 0 | (947) | -100.0% | (500) | -100.0% |
| ALARM ORDINANCE FEES | 16,200 | 26,520 | 21,000 | 13,800 | 20,000 | 6,200 | 44.9% | (1,000) | -4.8% |
| FINES | 45,121 | 69,505 | 50,000 | 43,194 | 45,500 | 2,306 | 5.3% | (4,500) | -9.0% |
| INTEREST EARNINGS | |||||||||
| INTEREST EARNINGS | 2,750 | 102,835 | 165,759 | 309,075 | 275,000 | (34,075) | -11.0% | 109,241 | 65.9% |
| INTEREST EARNINGS | 2,750 | 102,835 | 165,759 | 309,075 | 275,000 | (34,075) | -11.0% | 109,241 | 65.9% |
| RENTS | |||||||||
| RENT OF PROPERTIES - POLICE | 11,392 | 11,392 | 11,392 | 12,342 | 11,392 | (950) | -7.7% | (0) | 0.0% |
| RENT REVENUE - DISTRICT COURT | 89,881 | 91,674 | 93,506 | 93,504 | 95,372 | 1,868 | 2.0% | 1,866 | 2.0% |
| RENTS | 101,273 | 103,066 | 104,898 | 105,846 | 106,764 | 918 | 0.9% | 1,866 | 1.8% |
5
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj ($) | 24 Prop Bud vs. '23 Proj (%) | 24 Prop Bud vs. '23 Bud ($) | 24 Prop Bud vs. '23 Bud (%) | |
|---|---|---|---|---|---|---|---|---|---|
| STATE SHARED REVENUE & ENTITLEMENT | |||||||||
| HHW REBATES | 3,928 | 3,380 | 3,250 | 4,456 | 4,500 | 44 | 1.0% | 1,250 | 38.5% |
| P.U. REALTY TAX | 8,108 | 8,734 | 8,000 | 8,057 | 8,500 | 443 | 5.5% | 500 | 6.3% |
| PA LIQUOR CONTROL BOARD | 0 | 650 | 0 | 650 | 650 | 0 | 0.0% | 650 | |
| PENSION AID - STATE DC | 120,253 | 121,840 | 125,000 | 148,345 | 145,000 | (3,345) | -2.3% | 20,000 | 16.0% |
| STATE SHARED REVENUE & ENTITLEMENT | 132,289 | 134,604 | 136,250 | 161,508 | 158,650 | (2,858) | -1.8% | 22,400 | 16.4% |
| GENERAL GOVERNMENT | |||||||||
| FEES ZON.SUBDIV.LAND DEV. | 450 | 775 | 0 | 6,300 | 0 | (6,300) | -100.0% | 0 | |
| FEES FOR ENG. RECHARGES | 19,648 | 30,052 | 24,000 | 38,943 | 30,000 | (8,943) | -23.0% | 6,000 | 25.0% |
| ZONING HEARING BOARD - FEES | 3,250 | 550 | 1,000 | 2,200 | 3,000 | 800 | 36.4% | 2,000 | 200.0% |
| SALES & DONATIONS - HISTORICAL COMM | 536 | (1) | 0 | 254 | 0 | (254) | -100.0% | 0 | |
| BLACKSMITH REVENUE | 655 | 1,256 | 1,000 | 884 | 1,000 | 116 | 13.2% | 0 | 0.0% |
| SALE-MAPS & PUBLICATIONS | 19 | 104 | 0 | 0 | 0 | 0 | 0 | ||
| SPCA RECHARGE FEES COLLECTED | 0 | 351 | 0 | 0 | 0 | 0 | 0 | ||
| PROPERTY TAX - CERT FEES | 5,005 | 430 | 0 | 0 | 0 | 0 | 0 | ||
| GENERAL GOVERNMENT | 29,563 | 33,517 | 26,000 | 49,130 | 34,000 | (15,130) | -30.8% | 8,000 | 30.8% |
| PUBLIC SAFETY | |||||||||
| BUILDING PERMITS | 282,016 | 403,577 | 300,000 | 429,877 | 375,000 | (54,877) | -12.8% | 75,000 | 25.0% |
| REOCCUPANCY PERMIT FEES-APT RENTALS | 24,720 | 31,020 | 26,500 | 21,859 | 30,000 | 8,141 | 37.2% | 3,500 | 13.2% |
| REOCCUPANCY PERMIT FEES-RESALES | 22,800 | 17,650 | 21,500 | 24,028 | 22,000 | (2,028) | -8.4% | 500 | 2.3% |
| RENTAL INSPECTION - COMMERCIAL | 1,700 | 500 | 1,000 | 200 | 0 | (200) | -100.0% | (1,000) | -100.0% |
| CONTRACTOR LICENSING PER. | 2,425 | 2,050 | 1,500 | 3,777 | 4,500 | 723 | 19.1% | 3,000 | 200.0% |
| WIRELESS ANNUAL REGISTRATION FEE | 200 | 200 | 200 | 175 | 200 | 25 | 14.3% | 0 | 0.0% |
| STORMWATER MNGT INSPECTION FEE | 345 | 0 | 1,000 | 1,100 | 500 | (600) | -54.5% | (500) | -50.0% |
| UCC TRAINING FEE (DCED) | 3,542 | 3,618 | 3,500 | 5,779 | 3,492 | (2,287) | -39.6% | (8) | -0.2% |
| MISCELLANEOUS CODES REVENUE | 0 | 100 | 0 | 200 | 400 | 200 | 100.0% | 400 | |
| SPRAY IRRIGATION LOAN REV. | 0 | 24,758 | 0 | 0 | 0 | 0 | 0 | ||
| ON-LOT MANAGEMENT FEES | 880 | 1,440 | 1,000 | 617 | 0 | (617) | -100.0% | (1,000) | -100.0% |
| SEWER INSPECTION FEES | 60 | 150 | 0 | 40 | 0 | (40) | -100.0% | 0 | |
| PUBLIC SAFETY | 338,687 | 485,063 | 356,200 | 487,652 | 436,092 | (51,560) | -10.6% | 79,892 | 22.4% |
| HIGHWAY & STREETS | |||||||||
| MISCELLANEOUS - PUBLIC WORKS | 5,852 | 433 | 1,000 | 273 | 500 | 227 | 83.3% | (500) | -50.0% |
| PENN DOT RECHARGE GRASS CUTTING | 0 | 443 | 443 | 0 | 0 | 0 | (443) | -100.0% | |
| MAINTENANCE RECHARGES - CCCBI | 600 | 170 | 500 | 1,256 | 1,500 | 244 | 19.4% | 1,000 | 200.0% |
| HIGHWAY & STREETS | 6,452 | 1,045 | 1,943 | 1,529 | 2,000 | 471 | 30.8% | 57 | 2.9% |
6
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| CULTURE & RECREATION | |||||||||
| TRIPS | 0 | 2,250 | 18,060 | 13,719 | 18,920 | 5,201 | 37.9% | 860 | 4.8% |
| SUMMER PROGRAM | 33,977 | 66,633 | 65,000 | 111,076 | 115,000 | 3,924 | 3.5% | 50,000 | 76.9% |
| COMMUNITY DAY | 17,536 | 22,390 | 27,000 | 1,675 | 25,000 | 23,325 | 1392.5% | (2,000) | -7.4% |
| AMPHITHEATER EVENTS | 1,200 | 3,340 | 2,750 | 2,413 | 1,000 | (1,413) | -58.6% | (1,750) | -63.6% |
| PARK FEES | 8,675 | 7,054 | 7,500 | 11,896 | 12,000 | 104 | 0.9% | 4,500 | 60.0% |
| BALL FIELD RENTAL | 10,060 | 12,797 | 10,000 | 18,767 | 10,000 | (8,767) | -46.7% | 0 | 0.0% |
| GOLF APPLEBROOK/HMV | 23,350 | 12,280 | 21,000 | 23,390 | 17,500 | (5,890) | -25.2% | (3,500) | -16.7% |
| ART | 13,825 | 3,805 | 7,500 | 0 | 4,000 | 4,000 | (3,500) | -46.7% | |
| ROBOTICS PROGRAM | 3,410 | 4,900 | 5,000 | 5,155 | 5,000 | (155) | -3.0% | 0 | 0.0% |
| MISCELLANEOUS EVENTS | 2,552 | 4,150 | 1,500 | 4,740 | 5,500 | 760 | 16.0% | 4,000 | 266.7% |
| TENNIS COURT RENT | 4,290 | 2,705 | 4,000 | 3,316 | 1,200 | (2,116) | -63.8% | (2,800) | -70.0% |
| ADULT & YOUTH TENNIS INSTRUCTION | 9,830 | 20,705 | 15,000 | 30,683 | 23,000 | (7,683) | -25.0% | 8,000 | 53.3% |
| ZUMBA | 2,804 | 3,978 | 4,250 | 1,045 | 4,200 | 3,155 | 301.9% | (50) | -1.2% |
| YOGA CLASSES | 9,550 | 12,567 | 11,802 | 15,092 | 16,900 | 1,808 | 12.0% | 5,098 | 43.2% |
| ROCKETRY SUMMER CAMP | 1,550 | 1,840 | 2,000 | 1,450 | 1,500 | 50 | 3.4% | (500) | -25.0% |
| APIARY EDUCATION PROGRAM | 2,500 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| CULTURE & RECREATION | 145,109 | 182,721 | 202,362 | 244,637 | 261,720 | 17,083 | 7.0% | 59,358 | 29.3% |
| MISCELLANEOUS REVENUE | |||||||||
| MISCELLANEOUS | 11,236 | 27,480 | 7,500 | 97,028 | 13,000 | (84,028) | -86.6% | 5,500 | 73.3% |
| WKMEN'S COMP.-OUT OF AREA | 22,297 | 24,464 | 25,000 | 20,546 | 20,000 | (546) | -2.7% | (5,000) | -20.0% |
| INSURANCE CLAIMS AND DIVIDENDS | 70,193 | 78,379 | 35,000 | 37,615 | 35,000 | (2,615) | -7.0% | 0 | 0.0% |
| WIRELESS REVENUE | 48,148 | 128,668 | 64,707 | 64,707 | 64,707 | 0 | 0.0% | 0 | 0.0% |
| WIRELESS TOWER REIMBURSEMENT | 5,916 | 4,764 | 5,950 | 6,102 | 5,000 | (1,102) | -18.1% | (950) | -16.0% |
| INSURANCE PROCEEDS - PUBLIC WORKS | 4,913 | 27,776 | 0 | 0 | 0 | 0 | 0 | ||
| MISCELLANEOUS REVENUE | 162,702 | 291,531 | 138,157 | 225,998 | 137,707 | (88,290) | -39.1% | (450) | -0.3% |
| INTERFUND OPERATING TRANSFERS | |||||||||
| TRFR FR LIQ FUELD - SNOW MATERIALS | 63,194 | 1,674 | 60,000 | 60,000 | 2,000 | (58,000) | -96.7% | (58,000) | -96.7% |
| TRFR FR LIQ FUELS SNOW EQUIP RENTAL | 19,878 | 15,418 | 20,000 | 20,000 | 16,500 | (3,500) | -17.5% | (3,500) | -17.5% |
| TRFR FR LIQ FUELS TRAF SIG M&R | 0 | 0 | 10,000 | 10,000 | 12,000 | 2,000 | 20.0% | 2,000 | 20.0% |
| TRFR FR LIQ FUELS STREET LIGHTING | 9,415 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| TRFR FR LIQ FUELS ROAD MATERIALS | 18,845 | 0 | 60,000 | 60,000 | 0 | (60,000) | -100.0% | (60,000) | -100.0% |
| TRFR FR LIQ FUELS RESURFACING MAT'L | 208,561 | 359,945 | 240,000 | 240,000 | 360,000 | 120,000 | 50.0% | 120,000 | 50.0% |
| TRFR FR LIQ FUELS - EQUIP RENTAL | 41,436 | 33,707 | 30,000 | 30,000 | 35,000 | 5,000 | 16.7% | 5,000 | 16.7% |
| TRFR FR LIQ FUELS - TREE REMOVAL | 42,637 | 39,353 | 40,000 | 40,000 | 40,000 | 0 | 0.0% | 0 | 0.0% |
| TRFR FR LIQ FUELS-STORM WATER EQUIP | 30,649 | 1,208 | 40,000 | 40,000 | 1,500 | (38,500) | -96.3% | (38,500) | -96.3% |
| TRFR FR LF - MINOR EQUIP.VEHICLE | 39,453 | 15,020 | 10,000 | 10,000 | 15,000 | 5,000 | 50.0% | 5,000 | 50.0% |
| TRFR FR LF - VEHICLE MINOR EQUIP | 15,632 | 8,205 | 5,000 | 5,000 | 10,000 | 5,000 | 100.0% | 5,000 | 100.0% |
| TRFR FR LF-STREET/TRAF LIGHT MAINT | 6,781 | 14,148 | 5,000 | 12,250 | 15,000 | 2,750 | 22.4% | 10,000 | 200.0% |
| TRFR FR LF - RESURFACING RENTALS | 14,879 | 32,655 | 5,000 | 5,000 | 35,000 | 30,000 | 600.0% | 30,000 | 600.0% |
| TRANSF. FROM SEWER OPER. | 449,911 | 521,008 | 460,000 | 617,992 | 600,000 | (17,992) | -2.9% | 140,000 | 30.4% |
| TRANSFER FROM REFUSE | 71,865 | 85,772 | 80,000 | 95,474 | 100,000 | 4,526 | 4.7% | 20,000 | 25.0% |
| TRANSF. FROM MUNIC. AUTH. | 30,920 | 33,488 | 32,000 | 37,484 | 40,000 | 2,516 | 6.7% | 8,000 | 25.0% |
| INTERFUND OPERATING TRANSFERS | 1,064,056 | 1,162,528 | 1,097,000 | 1,283,199 | 1,726,000 | 442,801 | 34.5% | 629,000 | 57.3% |
| TOTAL REVENUES | 11,453,479 | 11,987,004 | 12,278,669 | 12,990,547 | 13,229,833 | 239,286 | 1.8% | 951,165 | 7.7% |
7
| EXPENSES | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud |
|---|---|---|---|---|---|---|---|---|---|
| GENERAL GOVERNMENT | |||||||||
| SALARIES - SUPERVISORS/MGMT/FIN/ADMIN | 647,315 | 650,113 | 680,103 | 695,092 | 674,645 | (20,447) | -2.9% | (5,457) | -0.8% |
| MATERIALS & SUPPLIES | 17,689 | 16,210 | 21,911 | 18,839 | 20,000 | 1,161 | 6.2% | (1,911) | -8.7% |
| STATIONERY | 2,929 | 2,121 | 3,061 | 1,578 | 2,500 | 922 | 58.4% | (561) | -18.3% |
| MINOR EQUIP. PURCH. &REP. | 1,547 | 1,424 | 1,836 | 2,057 | 2,500 | 443 | 21.5% | 664 | 36.2% |
| GENERAL EXPENSE | 36,198 | 100,001 | 10,000 | 16,950 | 20,000 | 3,050 | 18.0% | 10,000 | 100.0% |
| NEIGHBORHOOD UNIVERSITY | 717 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| SUSTAINABILITY COMMITTEE EXPENSES | 415 | 1,579 | 3,000 | 3,000 | 2,733 | (267) | -8.9% | (267) | -8.9% |
| PSATS EXPENSE | 5,393 | 2,745 | 5,000 | 4,263 | 5,000 | 737 | 17.3% | 0 | 0.0% |
| CCATO EXPENSES | 800 | 770 | 800 | 1,200 | 800 | (400) | -33.3% | 0 | 0.0% |
| CONSULTING SERVICES | 40,933 | 51,178 | 67,250 | 56,089 | 55,841 | (248) | -0.4% | (11,409) | -17.0% |
| CONSULTING - PERSONNEL | 0 | 0 | 25,000 | 25,565 | 500 | (25,065) | -98.0% | (24,500) | -98.0% |
| COMMUNICATION EXPENSE | 42,607 | 42,140 | 50,000 | 46,534 | 51,650 | 5,116 | 11.0% | 1,650 | 3.3% |
| POSTAGE | 5,681 | 7,668 | 7,500 | 4,652 | 8,000 | 3,348 | 72.0% | 500 | 6.7% |
| AUTO ALLOWANCE | 632 | 0 | 1,000 | 1,000 | 0 | (1,000) | -100.0% | (1,000) | -100.0% |
| ADVERTISING - PRINTING | 11,370 | 6,198 | 9,987 | 9,978 | 10,000 | 22 | 0.2% | 13 | 0.1% |
| ABC APPRECIATION EVENT | 0 | 0 | 10,000 | 5,065 | 6,000 | 935 | 18.5% | (4,000) | -40.0% |
| NEWSLETTERS | 0 | 0 | 12,000 | 8,373 | 8,073 | (299) | -3.6% | (3,927) | -32.7% |
| INSURANCE - BONDING | 0 | 1,619 | 7,905 | 7,238 | 7,455 | 217 | 3.0% | (450) | -5.7% |
| MAINTENANCE & REPAIRS | 602 | 0 | 550 | 714 | 250 | (464) | -65.0% | (300) | -54.6% |
| RENTAL OF EQUIP. -OFFICE | 8,311 | 7,633 | 10,320 | 9,013 | 10,500 | 1,487 | 16.5% | 180 | 1.7% |
| BANK FEES | 2,628 | 3,779 | 3,450 | 3,380 | 3,456 | 76 | 2.2% | 6 | 0.2% |
| CAP REPLACEMENT - OFFICE EQUIP | 11,924 | 22,110 | 6,719 | 31,719 | 12,000 | (19,719) | -62.2% | 5,281 | 78.6% |
| AUDITING EXPENSE | 41,750 | 42,500 | 42,500 | 42,500 | 44,625 | 2,125 | 5.0% | 2,126 | 5.0% |
| LEGAL - ADMIN | 13,763 | 35,689 | 35,000 | 34,142 | 35,000 | 858 | 2.5% | 0 | 0.0% |
| ENGINEERING SERVICES | 28,389 | 11,789 | 24,000 | 58,800 | 40,000 | (18,800) | -32.0% | 16,000 | 66.7% |
| ENGINEER.& MISC.RECHARGES | 19,450 | 29,223 | 24,000 | 49,621 | 30,000 | (19,621) | -39.5% | 6,000 | 25.0% |
| COMPUTER EXPENSE | 15,578 | 12,828 | 13,450 | 11,876 | 15,000 | 3,124 | 26.3% | 1,550 | 11.5% |
| CAP REPLACE - SOFTWARE | 0 | 0 | 0 | 43,250 | 43,250 | 0 | 0.0% | 43,250 | |
| CONTRIB.-MALVERN LIBRARY | 22,500 | 22,500 | 30,000 | 30,000 | 31,900 | 1,900 | 6.3% | 1,900 | 6.3% |
| GENERAL GOVERNMENT | 979,121 | 1,071,816 | 1,106,340 | 1,222,487 | 1,141,680 | (80,807) | -6.6% | 35,339 | 3.2% |
| TAX COLLECTION | |||||||||
| R.E.TAX COLLECT-COMMISSION/SALARIES | 1 | 0 | 1 | 2 | 0 | (2) | -100.0% | (1) | -100.0% |
| FINANCE DEPT - TAX PROCESSING | 11,933 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| CC TAX COLLECTION COMMITTEE | 984 | 0 | 1,000 | 1,000 | 0 | (1,000) | -100.0% | (1,000) | -100.0% |
| R.E. TAX COLLECT - MISC EXPENSE | 3,220 | 0 | 0 | 362 | 500 | 138 | 38.2% | 500 | |
| EIT COMMISSION | 97,895 | 113,201 | 112,000 | 106,688 | 113,050 | 6,362 | 6.0% | 1,050 | 0.9% |
| EIT - POSTAGE CHARGED BY KEYSTONE | 1,341 | 1,607 | 1,878 | 1,584 | 2,424 | 840 | 53.0% | 546 | 29.1% |
| LST - POSTAGE CHARGED BY KEYSTONE | 102 | 101 | 150 | 141 | 210 | 69 | 48.6% | 60 | 40.4% |
| LOCAL SERVICES TAX COMMISSION | 4,163 | 4,189 | 5,100 | 4,005 | 4,200 | 195 | 4.9% | (900) | -17.6% |
| TAX COLLECTION | 119,639 | 119,098 | 120,129 | 113,782 | 120,385 | 6,602 | 5.8% | 256 | 0.2% |
8
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| GENERAL GOVERNMENT BLDG & PLANT | |||||||||
| TWP. BLDG. - MATERIALS & SUPPLIES | 394 | 884 | 900 | 34 | 500 | 466 | 1379.3% | (400) | -44.5% |
| TWP. BLDG. - MINOR EQUIPEMENT | 2,493 | 1,650 | 2,500 | 0 | 2,500 | 2,500 | 0 | 0.0% | |
| TWP. BLDG. - FUEL, LIGHT, WATER | 39,282 | 43,244 | 40,000 | 43,176 | 47,000 | 3,824 | 8.9% | 7,000 | 17.5% |
| PW BLDG - FUEL,LIGHT,SEWER & WATER | 12,865 | 14,174 | 15,000 | 15,731 | 17,000 | 1,269 | 8.1% | 2,000 | 13.3% |
| TWP. BLDG. - MAINT & REPAIRS | 81,058 | 98,833 | 100,000 | 137,694 | 95,000 | (42,694) | -31.0% | (5,000) | -5.0% |
| PW BUILDING - MAINT REPAIRS | 20,718 | 53,289 | 30,000 | 43,937 | 30,000 | (13,938) | -31.7% | 0 | 0.0% |
| DISTRICT COURT EXPENSES | 20,810 | 27,725 | 33,000 | 41,740 | 13,000 | (28,740) | -68.9% | (20,000) | -60.6% |
| WIRELESS TOWER TAX PAYMENTS | 5,916 | 5,996 | 6,250 | 6,102 | 6,194 | 92 | 1.5% | (57) | -0.9% |
| CAP REPLACEMENT - TWP BLDG | 45,525 | 81,069 | 46,174 | 46,174 | 40,000 | (6,174) | -13.4% | (6,174) | -13.4% |
| CAP PURCHASE - TWP BLDG | 146,384 | 272,686 | 45,000 | 45,000 | 45,000 | 0 | 0.0% | 0 | 0.0% |
| BOOT & PAOLI LED SIGN | 542 | 390 | 400 | 0 | 400 | 400 | 0 | 0.0% | |
| NEW SOFTWARE 2021 | 75,500 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| GENERAL GOVERNMENT BLDG & PLANT | 451,488 | 599,940 | 319,223 | 379,588 | 296,593 | (82,995) | -21.9% | (22,630) | -7.1% |
| PUBLIC SAFETY | |||||||||
| POLICE ARBITRATION AND LEGAL FEES | 0 | 1,150 | 0 | 4,050 | 0 | (4,050) | -100.0% | 0 | |
| POLICE GEN.EXPENSE | 3,782,629 | 3,991,623 | 4,326,351 | 4,278,382 | 5,194,943 | 916,560 | 21.4% | 868,592 | 20.1% |
| REGIONAL POLICE BLDG INTEREST | 6,256 | 13,026 | 5,524 | 10,128 | 0 | (10,128) | -100.0% | (5,524) | -100.0% |
| REGIONAL POLICE BLDG PRINCIPAL | 117,183 | 109,474 | 119,177 | 114,574 | 0 | (114,574) | -100.0% | (119,177) | -100.0% |
| CAPITAL CONTRIBUTION - POLICE BLDG | 20,100 | 20,600 | 21,100 | 21,100 | 21,650 | 550 | 2.6% | 550 | 2.6% |
| S.P.C.A. CONTRACT | 8,044 | 9,492 | 8,500 | 11,291 | 30,600 | 19,309 | 171.0% | 22,100 | 260.0% |
| FIREFIGHTER STIPEND FOR PW | 8,500 | 8,800 | 9,600 | 9,645 | 21,600 | 11,955 | 123.9% | 12,000 | 125.0% |
| FIRE MARSHAL - EXPENSES | 0 | 0 | 0 | 6,023 | 0 | (6,023) | -100.0% | 0 | |
| HYDRANT & WATER SERVICE | 74,502 | 80,078 | 85,099 | 85,113 | 90,000 | 4,887 | 5.7% | 4,901 | 5.8% |
| CONTRIB. TO VOL. FIRE CO. | 383,059 | 400,594 | 499,882 | 500,489 | 550,627 | 50,139 | 10.0% | 50,745 | 10.2% |
| VOLUNTEER FIREFIGHTER WORKERS COMP | 44,489 | 47,599 | 45,713 | 41,937 | 46,000 | 4,063 | 9.7% | 287 | 0.6% |
| PUBLIC SAFETY | 4,444,762 | 4,682,436 | 5,120,946 | 5,082,731 | 5,955,420 | 872,689 | 17.2% | 834,474 | 16.3% |
| PLANNING & ZONING | |||||||||
| ZONING/CODES/INSPECTORS WAGES & SALARIES | 312,551 | 298,604 | 323,351 | 308,453 | 385,852 | 77,399 | 25.1% | 62,501 | 19.3% |
| CODE BOOKS/OTHER | 5,367 | 8,099 | 7,500 | 9,223 | 8,000 | (1,223) | -13.3% | 500 | 6.7% |
| ZONING CONSULTANTS | 263 | 0 | 1,000 | 1,000 | 0 | (1,000) | -100.0% | (1,000) | -100.0% |
| COURT REPORTERS | 1,575 | 1,506 | 2,163 | 336 | 0 | (336) | -100.0% | (2,163) | -100.0% |
| LEGAL - CODES | 3,515 | 13,778 | 12,382 | 1,220 | 6,000 | 4,780 | 392.0% | (6,382) | -51.5% |
| LEGAL - PLANNING COMMISSION | 1,470 | 1,159 | 1,644 | 0 | 750 | 750 | (894) | -54.4% | |
| LEGAL - ZONING HEARING BOARD | 14,803 | 18,929 | 13,147 | 13,274 | 15,500 | 2,226 | 16.8% | 2,353 | 17.9% |
| LEGAL - CONDITIONAL USE | 0 | 0 | 500 | 500 | 0 | (500) | -100.0% | (500) | -100.0% |
| LEGAL - SUBDIVISION & LAND DEVELOP | 0 | 4,659 | 1,500 | 3,003 | 5,000 | 1,997 | 66.5% | 3,500 | 233.4% |
| ZONING IT CONSULTING | 336 | 336 | 379 | 343 | 346 | 3 | 0.9% | (32) | -8.6% |
| GENERAL EXPENSE | 1,576 | 960 | 1,500 | 4,099 | 2,000 | (2,099) | -51.2% | 500 | 33.3% |
| ENGINEERING SERVICES | 40,113 | 20,327 | 10,000 | 43,208 | 2,500 | (40,708) | -94.2% | (7,500) | -75.0% |
| LEGAL - TWP CODE | 10,349 | 1,106 | 6,000 | 1,000 | 1,500 | 500 | 50.0% | (4,500) | -75.0% |
| UNIFORM CONSTRUCTION CODE FEES | 3,528 | 3,695 | 3,835 | 3,887 | 2,000 | (1,887) | -48.5% | (1,835) | -47.8% |
| RENTAL OF EQUIP. -CODES | 0 | 0 | 0 | 2,081 | 2,392 | 311 | 15.0% | 2,392 | |
| PLANNING & ZONING | 395,445 | 373,157 | 384,900 | 391,628 | 431,840 | 40,212 | 10.3% | 46,940 | 12.2% |
9
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| RECYCLING | |||||||||
| E-RECYCLING EVENTS | 7,000 | 7,000 | 8,000 | 8,000 | 7,000 | (1,000) | -12.5% | (1,000) | -12.5% |
| COUNTY HAZARDOUS WASTE | 6,760 | 8,912 | 4,000 | 4,189 | 8,378 | 4,189 | 100.0% | 4,378 | 109.4% |
| Roadside Litter Pick-Up | 0 | 0 | 5,000 | 4,000 | 5,000 | 1,000 | 25.0% | 0 | 0.0% |
| RECYCLING | 13,760 | 15,912 | 17,000 | 16,189 | 20,378 | 4,189 | 25.9% | 3,378 | 19.9% |
| PUBLIC WORKS - SANITATION | |||||||||
| WAGES - SEWER/STORMWATER/ADMIN/FIN | 319,533 | 266,706 | 211,983 | 289,907 | 326,611 | 36,704 | 12.7% | 114,629 | 54.1% |
| STORMWATER MATERIALS & SUPPLIES | 112,232 | 63,559 | 100,000 | 154,581 | 150,000 | (4,581) | -3.0% | 50,000 | 50.0% |
| STORMWATER MGMT.EXPENSE MS4 | 500 | 3,000 | 4,500 | 2,500 | 4,500 | 2,000 | 80.0% | 0 | 0.0% |
| STORMWATER ENGINEERING | 1,104 | 497 | 17,500 | 0 | 17,500 | 17,500 | 0 | 0.0% | |
| STORMWATER EQUIPMENT RENTAL | 35,840 | 17,528 | 20,000 | 29,021 | 30,099 | 1,078 | 3.7% | 10,099 | 50.5% |
| PUBLIC WORKS - SANITATION | 469,210 | 351,289 | 353,982 | 476,009 | 528,709 | 52,701 | 11.1% | 174,727 | 49.4% |
| PUBLIC WORKS - HWYS ROADS & STREETS | |||||||||
| HWY/ADMIN/FIN - SALARIES & WAGES | 634,868 | 634,732 | 725,928 | 737,382 | 743,875 | 6,494 | 0.9% | 17,948 | 2.5% |
| VEHICLE OPERATION - FUEL | 67,359 | 92,692 | 67,000 | 77,735 | 69,030 | (8,706) | -11.2% | 2,030 | 3.0% |
| MAINTENANCE AND REPAIRS - FUEL TANK | 480 | 1,061 | 500 | 423 | 500 | 77 | 18.1% | 0 | 0.0% |
| VEHICLE MAINT AND REPAIR | 131,850 | 131,079 | 131,000 | 179,648 | 150,000 | (29,648) | -16.5% | 19,001 | 14.5% |
| MINOR EQUIP. PURCHASE | 17,319 | 35,226 | 22,000 | 23,484 | 20,701 | (2,783) | -11.9% | (1,299) | -5.9% |
| CAP REPLACEMENT - HWY EQUIP | 160,834 | 302,165 | 147,358 | 147,358 | 145,000 | (2,358) | -1.6% | (2,358) | -1.6% |
| CAP PURCHASE - HWY EQUIP | 7,438 | 14,740 | 28,000 | 165,998 | 30,000 | (135,998) | -81.9% | 2,000 | 7.1% |
| SNOW - MATERIALS & SUPPLIES | 106,412 | 41,707 | 90,000 | 90,470 | 75,000 | (15,470) | -17.1% | (15,000) | -16.7% |
| SNOW - MAINTENANCE & REPAIRS | 24,872 | 19,816 | 17,000 | 7,804 | 17,000 | 9,196 | 117.8% | 0 | 0.0% |
| SNOW - EQUIPMENT RENTAL | 19,878 | 21,271 | 25,000 | 23,308 | 25,000 | 1,692 | 7.3% | 0 | 0.0% |
| MATERIALS & SUPPLIES - SIGNS | 17,882 | 16,446 | 12,800 | 14,914 | 14,068 | (846) | -5.7% | 1,268 | 9.9% |
| UTILITIES - TRAFFIC LIGHTS | 6,839 | 7,188 | 8,700 | 7,504 | 16,700 | 9,195 | 122.5% | 8,000 | 92.0% |
| MAINT. REPAIRS.TRAFF.SIG. | 29,357 | 85,757 | 48,000 | 91,870 | 100,000 | 8,130 | 8.8% | 52,000 | 108.3% |
| STREET LIGHTING | 9,415 | 14,039 | 16,000 | 13,044 | 16,000 | 2,956 | 22.7% | 0 | 0.0% |
| GENERAL EXPENSE - SHOP | 12,545 | 26,312 | 18,000 | 25,679 | 24,195 | (1,485) | -5.8% | 6,194 | 34.4% |
| SHOP - TOOLS | 7,059 | 6,736 | 8,000 | 4,353 | 5,000 | 647 | 14.9% | (3,000) | -37.5% |
| LEGAL - PUBLIC WORKS | 0 | 900 | 0 | 650 | 1,148 | 498 | 76.6% | 1,148 | |
| MATERIALS & SUPPLIES-HIGHWAYS | 144,356 | 57,569 | 160,000 | 176,681 | 125,000 | (51,681) | -29.3% | (35,000) | -21.9% |
| MATER. & SUPPLY-RESURFAC. | 218,119 | 370,317 | 300,000 | 268,202 | 260,000 | (8,202) | -3.1% | (40,000) | -13.3% |
| TREE REMOVAL | 135,959 | 88,992 | 150,000 | 98,657 | 90,000 | (8,657) | -8.8% | (60,000) | -40.0% |
| STREET TREE PLANTINGS | 698 | 0 | 3,500 | 0 | 0 | 0 | (3,500) | -100.0% | |
| EQUIPMENT RENTAL | 31,553 | 34,487 | 50,000 | 71,805 | 75,000 | 3,195 | 4.4% | 25,000 | 50.0% |
| EQUIP. RENTAL -RESURFAC. | 27,475 | 42,530 | 86,000 | 75,325 | 78,500 | 3,175 | 4.2% | (7,500) | -8.7% |
| PUBLIC WORKS - HWYS ROADS & STREETS | 1,812,565 | 2,045,762 | 2,114,784 | 2,302,295 | 2,081,715 | (220,581) | -9.6% | (33,069) | -1.6% |
10
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| PARTICIPANT RECREATION | |||||||||
| ALL PARK & REC/SUMMER WAGES | 116,740 | 169,550 | 197,811 | 227,706 | 225,874 | (1,832) | -0.8% | 28,063 | 14.2% |
| PUBLIC WORKS SUPPORT COMM. DAY | 0 | 7,170 | 6,180 | 3,028 | 4,180 | 1,152 | 38.0% | (2,000) | -32.4% |
| PUBLIC WORKS SUPPORT PUMPKIN FEST | 0 | 4,343 | 854 | 5,382 | 854 | (4,528) | -84.1% | 0 | 0.0% |
| SUMMER PROGRAM SUPPLIES | 2,984 | 7,278 | 6,878 | 9,685 | 8,000 | (1,685) | -17.4% | 1,122 | 16.3% |
| SUMMER PROGRAM FIELD TRIPS | 6,162 | 11,092 | 6,180 | 16,532 | 11,770 | (4,762) | -28.8% | 5,590 | 90.5% |
| SUMMER PROGRAM - ENTERTAINMENT | 0 | 875 | 0 | 725 | 1,280 | 555 | 76.6% | 1,280 | |
| SUMMER PROGRAM GENERAL EXPENSE | 823 | 4,708 | 3,128 | 445 | 3,128 | 2,684 | 603.4% | 0 | 0.0% |
| GENERAL EXPENSE | 4,357 | 4,670 | 3,407 | 5,072 | 3,407 | (1,665) | -32.8% | 0 | 0.0% |
| TRIPS | 0 | 100 | 17,200 | 24,249 | 17,200 | (7,049) | -29.1% | 0 | 0.0% |
| PUMPKIN FESTIVAL | 3,091 | 3,485 | 3,500 | 3,559 | 3,500 | (59) | -1.6% | 0 | 0.0% |
| EGG HUNT | 50 | 1,376 | 1,365 | 1,381 | 2,000 | 619 | 44.8% | 635 | 46.5% |
| COMMUNITY DAY | 16,741 | 21,010 | 20,000 | 127 | 20,000 | 19,873 | 15707.6% | 0 | 0.0% |
| GOLF DAY - APPLEBROOK | 23,600 | 12,610 | 20,000 | 23,060 | 22,433 | (627) | -2.7% | 2,433 | 12.2% |
| ART | 12,776 | 3,773 | 2,560 | 3,424 | 2,560 | (864) | -25.2% | 0 | 0.0% |
| ROBOTICS PROGRAM | 61 | 118 | 152 | 400 | 500 | 100 | 25.0% | 349 | 230.0% |
| MISCELLANEOUS EVENTS | 1,319 | 2,497 | 1,500 | 3,743 | 5,000 | 1,257 | 33.6% | 3,500 | 233.3% |
| TEEN SHOWCASE | 0 | 0 | 0 | 1,952 | 1,000 | (952) | -48.8% | 1,000 | |
| LADIES & YOUTH TENNIS | 8,348 | 17,706 | 10,000 | 26,105 | 21,628 | (4,477) | -17.1% | 11,628 | 116.3% |
| ZUMBA | 2,698 | 3,999 | 4,074 | 485 | 4,074 | 3,590 | 740.5% | 0 | 0.0% |
| YOGA EXPENSE | 7,154 | 9,648 | 11,240 | 12,782 | 14,775 | 1,994 | 15.6% | 3,535 | 31.5% |
| ROCKETRY SUMMER CAMP | 942 | 971 | 947 | 938 | 1,656 | 718 | 76.6% | 709 | 74.8% |
| HOLIDAY TREE CELEBRATION | 407 | 1,121 | 703 | 660 | 784 | 124 | 18.8% | 81 | 11.6% |
| APIARY EDUCATION PROGRAM | 1,715 | 792 | 500 | 30 | 500 | 470 | 1562.8% | 0 | 0.0% |
| PICKLEBALL COURT | 0 | 2,603 | 0 | 2,421 | 3,463 | 1,042 | 43.1% | 3,463 | |
| COMMUNITY MEMORIAL PROGRAM | 0 | 238 | 0 | 294 | 519 | 225 | 76.6% | 519 | |
| CRED.CARD BANK CHARGES | 2,988 | 3,764 | 3,575 | 4,761 | 5,000 | 239 | 5.0% | 1,425 | 39.9% |
| AMPHITHEATER CONCERTS | 2,433 | 631 | 2,605 | 2,752 | 4,859 | 2,107 | 76.6% | 2,254 | 86.5% |
| PARTICIPANT RECREATION | 215,389 | 296,126 | 324,360 | 381,697 | 389,947 | 8,250 | 2.2% | 65,587 | 20.2% |
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| PARKS | |||||||||
| WAGES - PARK MAINT./ADMIN/FINANCE STAFF | 173,565 | 213,548 | 257,564 | 246,868 | 301,826 | 54,958 | 22.3% | 44,262 | 17.2% |
| MAINTENANCE SUPPLIES | 5,102 | 2,140 | 4,000 | 60 | 4,000 | 3,940 | 6601.7% | 0 | 0.0% |
| TREE REMOVAL-PARK | 0 | 21,417 | 12,000 | 45,393 | 40,000 | (5,393) | -11.9% | 28,000 | 233.3% |
| MINOR EQUIPMENT | 0 | 0 | 5,600 | 5,600 | 5,600 | 0 | 0.0% | 0 | 0.0% |
| GENERAL EXPENSE | 5,992 | 16,795 | 8,000 | 16,907 | 18,000 | 1,093 | 6.5% | 10,000 | 125.0% |
| PROFESSIONAL SERVICES | 200 | 300 | 10,000 | 4,468 | 14,147 | 9,678 | 216.6% | 4,147 | 41.5% |
| UTILITIES | 5,715 | 4,977 | 6,534 | 7,256 | 7,500 | 244 | 3.4% | 966 | 14.8% |
| BUTTERFLY GARDEN | 234 | 0 | 600 | 600 | 0 | (600) | -100.0% | (600) | -100.0% |
| LANDSCAPING | 6,881 | 15,195 | 12,000 | 3,470 | 7,000 | 3,530 | 101.7% | (5,000) | -41.7% |
| POND TREATMENT | 5,271 | 9,090 | 11,000 | 6,780 | 0 | (6,780) | -100.0% | (11,000) | -100.0% |
| POND LANDSCAPING | 0 | 0 | 2,000 | 359 | 250 | (109) | -30.5% | (1,750) | -87.5% |
| TENNIS COURT MAINTENANCE | 52 | 13 | 300 | 371 | 500 | 129 | 34.9% | 200 | 66.7% |
| MARYDELL POND REHAB | 20,012 | 845 | 750 | 971 | 0 | (971) | -100.0% | (750) | -100.0% |
| SOCCER FIELDS | 777 | 0 | 0 | 638 | 750 | 113 | 17.6% | 750 | |
| BALL FIELDS | 4,901 | 5,088 | 4,000 | 3,765 | 5,000 | 1,235 | 32.8% | 1,000 | 25.0% |
| TOT LOT | 2,562 | 0 | 500 | 500 | 0 | (500) | -100.0% | (500) | -100.0% |
| SATELITE PARK IMPROVEMENT (PONDS) | 935 | 930 | 1,500 | 8,442 | 0 | (8,442) | -100.0% | (1,500) | -100.0% |
| PARK MAINTENANCE & REPAIR | 29,057 | 52,786 | 45,000 | 36,920 | 45,000 | 8,080 | 21.9% | 0 | 0.0% |
| CAPITAL REPLACEMENT - PARK & REC | 24,158 | 44,219 | 18,977 | 20,000 | 44,700 | 24,700 | 123.5% | 25,723 | 135.6% |
| CAPITAL PURCHASE - PARK & REC | 0 | 0 | 288,272 | 81,000 | 0 | (81,000) | -100.0% | (288,272) | -100.0% |
| PARK WAGES THAT GENERATE REVENUE | 18,733 | 23,186 | 19,490 | 21,952 | 22,211 | 260 | 1.2% | 2,721 | 14.0% |
| PARKS | 304,147 | 410,528 | 708,086 | 517,499 | 521,483 | 3,984 | 0.8% | (186,603) | -26.4% |
| CONSERVATION & DEVELOPMENT | |||||||||
| WAGES - CONSERVANCY | 471 | 471 | 0 | 536 | 0 | (536) | -100.0% | 0 | |
| PROFESSIONAL SERVICES | 0 | 450 | 1,000 | 0 | 500 | 500 | (500) | -50.0% | |
| LANDSCAPING | 0 | 1,320 | 3,000 | 3,550 | 2,689 | (861) | -24.3% | (311) | -10.4% |
| CONSERVATION & DEVELOPMENT | 471 | 2,241 | 4,000 | 4,086 | 3,189 | (897) | -21.9% | (811) | -20.3% |
| HISTORICAL | |||||||||
| WAGES - HISTORICAL | 300 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| BLACKSMITH SUPPLIES | 514 | 2,328 | 1,000 | 625 | 500 | (125) | -19.9% | (500) | -50.0% |
| GENERAL EXPENSE | 0 | 0 | 0 | 180 | 0 | (180) | -100.0% | 0 | |
| MEMBERSHIPS/SUBS | 100 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| PROFESSIONAL SERVICES | 0 | 0 | 2,300 | 2,720 | 411 | (2,309) | -84.9% | (1,889) | -82.1% |
| HISTORICAL | 914 | 2,328 | 3,300 | 3,524 | 911 | (2,613) | -74.1% | (2,389) | -72.4% |
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| DEBT SERVICE | |||||||||
| SPRAY IRRIG-BOND PRINCIPAL | 24,000 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| PUB.WKS BLDG - PRINCIPAL | 162,609 | 168,968 | 175,782 | 175,782 | 0 | (175,782) | -100.0% | (175,782) | -100.0% |
| REFURBISH T/B-PRINCIPAL | 32,522 | 33,794 | 35,156 | 35,156 | 0 | (35,156) | -100.0% | (35,156) | -100.0% |
| WILLISTOWN CONSERVATION TRUST | 19,513 | 20,276 | 21,094 | 21,094 | 0 | (21,094) | -100.0% | (21,094) | -100.0% |
| PAOLI PIKE & 352 INTERSECTION | 92,752 | 96,379 | 100,266 | 100,266 | 0 | (100,266) | -100.0% | (100,266) | -100.0% |
| WESTTOWN ROAD BRIDGE - PRINCIPAL | 28,359 | 29,468 | 30,655 | 30,655 | 0 | (30,655) | -100.0% | (30,655) | -100.0% |
| PARK BRIDGE OVER RIDLEY CREEK | 8,131 | 8,448 | 8,789 | 8,789 | 0 | (8,789) | -100.0% | (8,789) | -100.0% |
| PARK WARNING LGHT @ APPLEBROOK | 2,732 | 2,838 | 2,953 | 2,953 | 0 | (2,953) | -100.0% | (2,953) | -100.0% |
| WESTTOWN WAY LOT - PRINCIPAL | 3,252 | 3,379 | 3,516 | 3,516 | 0 | (3,516) | -100.0% | (3,516) | -100.0% |
| PAOLI PK & LINE RD.-TURN LANES | 8,131 | 8,449 | 8,789 | 8,789 | 0 | (8,789) | -100.0% | (8,789) | -100.0% |
| SERIES 2017 BOND PRINCIPAL | 5,000 | 5,000 | 5,000 | 5,000 | 320,000 | 315,000 | 6300.0% | 315,000 | 6300.0% |
| SPRAY IRRIG.-BOND INTEREST | 333 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| PUBLIC WORKS BLDG - INTEREST | 21,283 | 14,252 | 6,945 | 6,593 | 0 | (6,593) | -100.0% | (6,945) | -100.0% |
| REFURBISH T/B -INTEREST | 4,257 | 2,850 | 1,389 | 1,445 | 0 | (1,445) | -100.0% | (1,389) | -100.0% |
| WILLISTOWN CONSERVATION TRUST | 2,554 | 1,710 | 833 | 867 | 0 | (867) | -100.0% | (833) | -100.0% |
| PAOLI PIKE & 352 INTERSECTION | 12,140 | 8,129 | 3,961 | 4,121 | 0 | (4,121) | -100.0% | (3,961) | -100.0% |
| WESTTOWN ROAD BRIDGE | 3,712 | 2,486 | 1,211 | 1,260 | 0 | (1,260) | -100.0% | (1,211) | -100.0% |
| PARK BRIDGE OVER RIDLEY CREEK | 1,064 | 713 | 347 | 361 | 0 | (361) | -100.0% | (347) | -100.0% |
| PARK WARNING LGHT @ APPLEBROOK | 358 | 239 | 117 | 121 | 0 | (121) | -100.0% | (117) | -100.0% |
| PURCHASE LOT WESTTOWN WAY | 426 | 285 | 139 | 145 | 0 | (145) | -100.0% | (139) | -100.0% |
| PAOLI PK/LINE-LEFT TURN LANES | 1,064 | 713 | 347 | 361 | 0 | (361) | -100.0% | (347) | -100.0% |
| SERIES 2017 BOND INTEREST | 141,900 | 141,700 | 141,500 | 141,500 | 141,400 | (100) | -0.1% | (100) | -0.1% |
| DEBT SERVICE | 576,090 | 550,077 | 548,789 | 549,405 | 461,400 | (88,005) | -16.0% | (87,389) | -15.9% |
| PENSION FUND CONTRIBUTION | |||||||||
| PENSION - DC NON-UNIFORM | 136,373 | 132,827 | 141,100 | 148,345 | 158,700 | 10,355 | 7.0% | 17,600 | 12.5% |
| PENSION FUND CONTRIBUTION | 136,373 | 132,827 | 141,100 | 148,345 | 158,700 | 10,355 | 7.0% | 17,600 | 12.5% |
| INSURANCE PREMIUMS | |||||||||
| HEALTH/LIFE/DISABILITY INS - OFFICE | 122,399 | 150,739 | 208,920 | 199,579 | 220,761 | 21,182 | 10.6% | 11,841 | 5.7% |
| HEALTH/LIFE/DISABILITY INS - CODES | 21,977 | 12,886 | 21,317 | 19,222 | 34,114 | 14,892 | 77.5% | 12,797 | 60.0% |
| HEALTH/LIFE/DISABILITY INS - PERMIT | 48,931 | 41,884 | 55,717 | 68,623 | 83,514 | 14,891 | 21.7% | 27,797 | 49.9% |
| HEALTH/LIFE/DISAB INS - PUBLIC WORK | (23) | 97 | 0 | 0 | 0 | (0) | -100.0% | 0 | |
| HEALTH/LIFE/DISAB - PW SANITATION | 37,659 | 30,828 | 28,378 | 39,773 | 35,230 | (4,543) | -11.4% | 6,852 | 24.1% |
| HEALTH/LIFE/DISAB - PW PARKS | 28,339 | 43,570 | 40,202 | 44,488 | 45,296 | 808 | 1.8% | 5,094 | 12.7% |
| HEALTH/LIFE/DISAB - PW SNOW | 6,198 | 11,433 | 18,919 | 4,335 | 12,582 | 8,247 | 190.3% | (6,337) | -33.5% |
| HEALTH/LIFE/DISAB INS - PW ROADS | 70,838 | 86,787 | 130,066 | 101,665 | 125,822 | 24,157 | 23.8% | (4,244) | -3.3% |
| BENEFITS - PARK REVENUE GENERATED | 3,149 | 4,841 | 4,730 | 4,976 | 5,033 | 57 | 1.2% | 303 | 6.4% |
| HEALTH/LIFE/DISAB INSUR - PARK/REC | 24,813 | 31,676 | 40,934 | 41,282 | 43,187 | 1,905 | 4.6% | 2,253 | 5.5% |
| HEALTH,ACCID. & LIFE | 0 | 156 | 0 | (25) | 0 | 25 | -100.0% | 0 | |
| INSURANCE COVERAGE -PREM. | 308,207 | 145,085 | 187,588 | 257,236 | 197,500 | (59,736) | -23.2% | 9,912 | 5.3% |
| HEALTH/LIFE/DISAB - PW STORMWATER | 28,906 | 13,852 | 14,189 | 31,827 | 27,681 | (4,147) | -13.0% | 13,492 | 95.1% |
| INSURANCE PREMIUMS | 701,393 | 573,834 | 750,959 | 812,981 | 830,720 | 17,739 | 2.2% | 79,761 | 10.6% |
13
| 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 Proposed Budget | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Proj | 24 Prop Bud vs. '23 Bud | 24 Prop Bud vs. '23 Bud | |
|---|---|---|---|---|---|---|---|---|---|
| EMPLOYEE BENEFITS | |||||||||
| MISC. EMPLOYEE BENEFITS | 1,632 | 901 | 1,222 | 161 | 500 | 339 | 209.9% | (722) | -59.1% |
| DRUG & ALCOHOL TESTING | 1,028 | 960 | 645 | 994 | 1,000 | 6 | 0.6% | 356 | 55.2% |
| ER PAYROLL TAXES - OFFICE | 55,908 | 61,462 | 67,082 | 80,287 | 68,763 | (11,524) | -14.4% | 1,681 | 2.5% |
| ER PAYROLL TAXES - FIRE FIRE STIPEN | 0 | 0 | 0 | 0 | 1,728 | 1,728 | 1,728 | ||
| ER PAYROLL TAXES - CODES | 7,682 | 6,444 | 7,101 | 7,490 | 11,967 | 4,477 | 59.8% | 4,866 | 68.5% |
| ER PAYROLL TAXES - PERMITS | 17,133 | 15,934 | 18,496 | 15,625 | 18,411 | 2,786 | 17.8% | (85) | -0.5% |
| ER PAYROLL TAXES - PW | 0 | 1,592 | 0 | 0 | 0 | 0 | 0 | ||
| ER TAXES - PW SEWER | 17,150 | 12,026 | 9,230 | 12,965 | 12,285 | (679) | -5.2% | 3,056 | 33.1% |
| ER TAXES - PW PARKS | 12,560 | 17,357 | 19,188 | 15,809 | 23,438 | 7,629 | 48.3% | 4,250 | 22.1% |
| ER TAXES - PW SNOW | 3,864 | 5,030 | 6,153 | 1,196 | 4,388 | 3,191 | 266.7% | (1,766) | -28.7% |
| ER TAXES - PW ROADS | 31,923 | 34,469 | 42,303 | 38,382 | 43,877 | 5,495 | 14.3% | 1,574 | 3.7% |
| ER TAX PARK MAINT GENERATE REVENUE | 1,396 | 1,929 | 1,538 | 1,701 | 1,755 | 54 | 3.2% | 217 | 14.1% |
| ER PAYROLL TAXES - PARK/REC | 9,502 | 13,863 | 16,423 | 19,283 | 18,999 | (284) | -1.5% | 2,577 | 15.7% |
| UNIFORMS | 39,758 | 43,946 | 47,225 | 50,242 | 60,000 | 9,758 | 19.4% | 12,775 | 27.1% |
| ER TAXES - PW STORMWATER | 12,923 | 4,422 | 4,615 | 0 | 9,653 | 9,653 | 5,038 | 109.2% | |
| TRAINING & SEMINARS-EMPLY | 1,374 | 3,631 | 19,550 | 18,924 | 10,000 | (8,924) | -47.2% | (9,550) | -48.8% |
| EMPLOYEE BENEFITS | 213,833 | 223,966 | 260,770 | 263,059 | 286,764 | 23,705 | 9.0% | 25,994 | 10.0% |
| INTERFUND TRANSFERS | |||||||||
| TRANSF. TO CAPITAL RESERVE | 61,647 | 250,322 | 0 | 0 | 0 | 0 | 0 | ||
| TRFR. TO INFRA STRUCTURE FUND | 339,058 | 200,258 | 0 | 0 | 0 | 0 | 0 | ||
| TRANSFER TO OPERATING RESERVE | 154,117 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| INTERFUND TRANSFERS | 554,822 | 450,580 | 0 | 0 | 0 | 0 | 0 | ||
| TOTAL EXPENSES | 11,389,421 | 11,901,916 | 12,278,669 | 12,665,307 | 13,229,833 | 564,527 | 4.5% | 951,165 | 7.7% |
| RESULTS FROM OPERATIONS | 64,058 | 85,088 | 0 | 325,240 | 0 | ||||
East Goshen Township
2024-2028 Capital Improvement Program
TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817
Environmentally Sound | Socially Equitable | Fiscally Responsible | EAST GOSHEN TOWNSHIP
Respecting the Past Serving the Present Preparing for the Future
NOVEMBER 14, 2023
15
2024-2028 Capital Improvement Program
Summary
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
Expenses
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Administration (Office, Buildings, Structures) | $ 57,000 | $ 128,000 | $ 36,000 | $ 30,000 | $ 30,000 |
| Public Works | $ 1,010,000 | $ 393,000 | $ 585,000 | $ 200,000 | $ 200,000 |
| Park | $ 52,000 | $ 50,000 | $ 50,000 | $ 50,000 | $ 50,000 |
| Milltown Dam | $ 1,009,138 | $ 150,000 | $ - | $ - | $ - |
| Paoli Pike Trail - Continue w/ Alternate Route B | $ 400,000 | $ - | $ - | $ - | $ - |
| Hershey Mill Pond | $ - | $ - | $ 250,000 | $ - | $ - |
| Bow Tree Pond I | $ 91,850 | $ - | $ - | $ - | $ - |
| WG Sanitary Treatment Plant | $ 124,613 | $ 174,078 | $ 35,000 | $ 35,000 | $ 35,000 |
| Ridley Creek STP, Pump Stations, & Infrastructure | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
| Total | $3,637,065 | $1,508,078 | $1,138,000 | $499,000 | $477,000 |
| Funding Source | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | $ 1,519,000 | $ 521,000 | $ 621,000 | $ 230,000 | $ 280,000 |
| Sewer Capital Reserve Fund | $ 1,017,077 | $ 787,078 | $ 217,000 | $ 219,000 | $ 197,000 |
| Grants | $ 91,850 | $ - | $ - | $ - | $ - |
| Series 2017 Bonds | $ 1,009,138 | $ 150,000 | $ - | $ - | $ - |
| Infrastructure Sustainability Fund | $ - | $ - | $ 250,000 | $ - | $ - |
| Total | $3,637,065 | $1,458,078 | $1,088,000 | $449,000 | $477,000 |
*** Large public projects currently underway are Bow Tree Pond dredging, Milltown Dam Rehabilitation, continuation of the Paoli Pike Trail, and the Chester Creek Interceptor cleaning and maintenance. The remaining items are plans for vehicle purchase and replacement, building maintenance, park improvements, and sewer treatment facility and storm water maintenance.
2024-2028 Capital Improvement Program
Administration/Office Capital Expenses
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Computer Replacement | $ 12,000 | $ 12,000 | $ 12,000 | $ 12,000 | $ 12,000 |
| Large Format Scanner/Printer | $ 12,000 | ||||
| Radio Booster | $ 45,000 | ||||
| Ceiling Heat/AC Units (3 units) | $ 12,000 | ||||
| Large Overhead Garage Doors | $ 16,000 | $ 18,000 | $ 18,000 | ||
| Township Building Windows | $ 100,000 | ||||
| Total | $ 57,000 | $ 128,000 | $ 36,000 | $ 30,000 | $ 30,000 |
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | $ 57,000 | $ 128,000 | $ 36,000 | $ 30,000 | $ 30,000 |
| Sewer Capital Reserve Fund | |||||
| Grants | |||||
| Series 2017 Bonds | |||||
| Infrastructure Sustainability Fund | |||||
| Total | $ 57,000 | $ 128,000 | $ 36,000 | $ 30,000 | $ 30,000 |
Notes:
- 4 PC replacements in 2024; possible server, software updates & licensing.
- 4 IPAD replacements in 2024 for Codes Department Inspectors and Director.
- Radio booster needed to comply with Township ordinance amendment, promoting public safety in event of serious emergency...if it testing indicates it is necessary.
2024-2028 Capital Improvement Program
Public Works Expenses
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Dump Truck | $ 256,000 | $ 200,000 | $ 200,000 | $ 200,000 | $ 200,000 |
| Gator ATV | $ 18,000 | ||||
| F350 Pickup w/ Plow | $ 70,000 | $ 70,000 | |||
| Vacuum Truck | $ 562,000 | ||||
| 2 Exmark Mowers | $ 35,000 | $ 35,000 | $ 35,000 | ||
| 2 Utility Trailers | $ 14,000 | ||||
| Drone | $ 3,000 | ||||
| Chipper | $ 100,000 | ||||
| Tractor/Mower | $ 70,000 | $ 70,000 | |||
| Paver | $ 250,000 | ||||
| Total | $ 1,010,000 | $ 393,000 | $ 585,000 | $ 200,000 | $ 200,000 |
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | $ 1,010,000 | $ 393,000 | $ 585,000 | $ 200,000 | $ 200,000 |
| Sewer Capital Reserve Fund | |||||
| Grants | |||||
| Series 2017 Bonds | |||||
| Infrastructure Sustainability Fund | |||||
| Total | $ 1,010,000 | $ 393,000 | $ 585,000 | $ 200,000 | $ 200,000 |
- Continued replacement of equipment and trucks per Fixed Asset and Capital Depreciation schedule.
- Estimate new paver needed by 2026. Current machine from 2016.
- VAC truck requested by PW Director for 2024/2025 delivery. This equipment has been used via rental and is utilized for sewer and storm water repairs and maintenance which greatly increases efficiency and reduces manpower needed.
2024-2028 Capital Improvement Program
Park Expenses
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Area Around Playground | $ 3,000 | ||||
| Veteran's Pavilion Area | $ 24,000 | ||||
| Misc. Mid-Term Improvements | $ 25,000 | ||||
| Re-Surface EGT Playground Area | $ 50,000 | $ 50,000 | $ 50,000 | $ 50,000 | |
| Total | $ 52,000 | $ 50,000 | $ 50,000 | $ 50,000 | $ 50,000 |
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | $ 52,000 | $ - | $ - | $ - | $ 50,000 |
| Sewer Capital Reserve Fund | |||||
| Grants | |||||
| Series 2017 Bonds | |||||
| Infrastructure Sustainability Fund | |||||
| Total | $ 52,000 | $ - | $ - | $ - | $ 50,000 |
- Area around playground projects include T-ball & volleyball area renovation and Wiffle Ball field.
- Veteran's Pavilion improvements include fixed chess tables, grill upgrades and stones course.
- Misc. mid-term improvements include tennis and baseball field bleachers.
- Projected increase in funding in anticipation of EGT Playground re-surfacing by 2030.
2024-2028 Capital Improvement Program
Hershey's Mill Estates Sewer, Milltown Dam, PPT, & WG STP
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Milltown Dam | $ 1,009,138 | $ 150,000 | |||
| Bow Tree Pond I | $ 91,850 | ||||
| Paoli Pike Trail - Continue w/ Alternate Route B | $ 400,000 | ||||
| Hershey Mill Pond | $ 250,000 | ||||
| West Goshen Sanitary Treatment Plant Improvements (Including Westtown Way Pump Station) | $ 124,613 | $ 174,078 | $ 35,000 | $ 35,000 | $ 35,000 |
| Total | $ 1,625,601 | $ 324,078 | $ 285,000 | $ 35,000 | $ 35,000 |
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | $ 400,000 | ||||
| Sewer Capital Reserve Fund | $ 124,613 | $ 174,078 | $ 35,000 | $ 35,000 | $ 35,000 |
| Grants | $ 91,850 | ||||
| Series 2017 Bonds | $ 1,009,138 | $ 150,000 | $ - | $ - | $ - |
| Infrastructure Sustainability Fund | $ - | $ - | $ 250,000 | $ - | $ - |
| Total | $ 1,625,601 | $ 324,078 | $ 285,000 | $ 35,000 | $ 35,000 |
- Assumes that 1/3 of immediate/required Milltown Mill Dam work occurs in 2023, 2/3 in 2024 with the remaining improvements to be determined. Remaining grant money spread to future year in anticipation of plantings, stream restoration, trails, possible parking area and other upgrades. No grant money is currently included in the forecast but would be sought by staff.
- Continuation of Paoli Pike Trail.
- Hershey's Mill Estates Sewer Rehabilitation completed in 2023.
- Bow Tree Pond dredging project started in 2023, to be completed in 2024. LSA grant awarded for $176K.
- Projected Hershey Mill Pond restoration is 2026.
- Ongoing commitment to WGSTP capital projects and final billing closeout for improvements completed.
2024-2028 Capital Improvement Program
EGT Sewer Capital Maintenance
(RC STP & Pump Stations)
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Hunt Country/HM Lift Station Pump Replacement | $ 20,000 | $ 20,000 | |||
| Hunt Country P/S Mag Meter | $ 15,000 | ||||
| Hunt Country P/S Muffin Monster | $ 67,000 | ||||
| Hunt Country P/S Bypass Pump | $ 2,000 | ||||
| Relining AC sewer lines and brick manholes | $ 130,000 | $ 130,000 | $ 130,000 | $ 130,000 | $ 130,000 |
| Ridley Creek STP rebuild 2 SBR pumps | $ 16,000 | ||||
| Ridley Creek STP rebuild 2 Sludge pumps | $ 7,500 | ||||
| Ridley Creek STP replace generator | $ 225,000 | ||||
| Ridley Creek STP Filter Feed Pump** | $ 30,000 | $ 20,000 | $ 20,000 | $ 20,000 | |
| Ridley Creek STP Blower Replacement | $ 12,000 | $ 12,000 | $ 12,000 | $ 12,000 | $ 12,000 |
| Chester Creek Coll manhole lining (?) for 5 manholes | $ 50,000 | ||||
| Chester Creek Coll HM Pumpstation upgrade | $ 85,000 | ||||
| Chester Creek Interceptor Phase 2/Supplee Valley Re-lining | $ 366,964 | $ 315,000 | |||
| Chester Creek Coll Muffin Monster swap out | $ 22,000 | $ 22,000 | |||
| Total | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | |||||
| Sewer Capital Reserve Fund | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
| Grants | |||||
| Series 2017 Bonds | |||||
| Infrastructure Sustainability Fund | |||||
| Total | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
- Ongoing maintenance and pump station upgrades per RCSTP Asset Depreciation inventory and staff recommendation.
- Replacement generator needed in 2024.
- Proactive Chester Creek Interceptor inspection & cleaning; Phase 1 in 2023, Phase 2 in 2024; Supplee Valley re-lining. Staff will seek grant funds to offset sewer capital fund contribution.
2024-2028 Capital Improvement Program
Sewer Capital Maintenance
(RC STP & Pump Stations)
[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]
Justification for New Assets
- Relining brick manholes and asbestos cement sewer lines was identified seven years ago as a long-term maintenance priority for pre-mid-1970s sewer assets, which are at the end of their useful life. Costs have increased; consider additional capital contribution annually. Supplee Valley would be next on the list for replacement.
- Current generator has major issues and needs to be replaced in 2024 to avoid constant power issues affecting various aspects of RCSTP.
- Hunt Country Pump Station upgrades recommended in 2025; has been postponed multiple years as other projects have taken priority.
- Hershey Mill Pump Station upgrades per asset depreciation schedule and recommendation for additional capacity.
- Proactive Inspection and Cleaning of Chester Creek Interceptor to address potential issues.
East Goshen Township
2024 Proposed Pass Through & All Other Funds Budget
November 14, 2023
TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817
23
PROPOSED OTHER FUND CHANGES
(from Preliminary to Proposed)
- Minor changes to revenue & expense in State Liquid Fuels Fund to parallel General Fund revenue.
- Capital Reserve Fund updated per changes in the 5-year Capital Plan. $400K expense added to Capital Reserve Fund for continuation of the Paoli Pike Trail as discussed at the 10/17 BoS meeting.; $565K shifted from 2025 to 2024 Budget for GAPVAX truck discussed and P.O. authorization given by BoS at prior meeting. The chassis and body will come in at different times between 2023 and 2025. The P.O. saves us $25K on the purchase price.; The chassis and body will come in at different times between 2023 and 2025. The P.O. saves us $25K on the purchase price.
- Sewer Operating Fund revenue and expenses updated based on October YTD 2023 and discussions with West Goshen Sewer Authority about 2024 O&M as well as Capital Costs per the West Goshen/East Goshen agreement.
- Refuse Fund revenue and expenses updated based on October YTD 2023.
- Municipal Authority and Sewer Capital Reserve Budget updated per changes in the 5-year Capital Plan.
- ARPA Fund updated based on reduction in Hershey Mill Estates Sewer Rehabilitation actual cost versus budget. Propose utilizing remaining funds for additional 2024 sewer projects.
EAST GOSHEN TOWNSHIP PASS THRU FUNDS PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Adopted Budget | 2023 Year-End Projection | 2024 PROPOSED Budget |
|---|---|---|---|---|---|---|
| GENERAL FUND | ||||||
| PASS THROUGH ACCOUNTS | ||||||
| FIRE | ||||||
| EXPENSES | ||||||
| FIREFIGHTERS - WAGE EXPENSE | 01411 1300 | 1,381,838 | 1,381,838 | 1,509,631 | 1,731,958 | 1,788,247 |
| FIREFIGHTERS - HEALTH INS EXPENSE | 01411 2000 | 262,577 | 262,577 | 312,151 | 312,151 | 327,758 |
| FIRE CO. PAYROLL PROCESS - EXPENSE | 01411 2300 | 5,768 | 5,768 | 6,250 | 6,250 | 6,875 |
| FIRE CO. WORKERS COMP INS - EXPENSE | 01411 2500 | 81,647 | 81,647 | 98,360 | 98,360 | 98,360 |
| FIRE CO. PAYROLL TAX - EXPENSE | 01487 1660 | 116,266 | 116,266 | 123,709 | 123,709 | 127,730 |
| VALIC - ER | 01487 1661 | 8,670 | 8,670 | 9,630 | 9,630 | 9,943 |
| INR 457 - ER | 01487 1665 | 21,267 | 21,267 | 22,223 | 22,223 | 22,946 |
| REVENUE | ||||||
| FF SHARE OF INSURANCE DIVIDENDS | 01380 0121 | 42,842 | 42,842 | - | - | - |
| PAID FIRE CO. REIMB. - REVENUE | 01380 0130 | 1,835,191 | 1,835,191 | 2,081,954 | 2,304,281 | 2,381,858 |
| SUBTOTAL | - | - | (0) | (0) | - | |
| HYDRANTS | ||||||
| HYDRANTS - RECHARGE EXPENSE | 01411 3631 | 28,860 | 28,860 | 35,000 | 35,000 | 36,050 |
| HYDRANTS - RECHARGE REVENUE | 01383 1200 | 28,860 | 28,860 | 35,000 | 35,000 | 36,050 |
| SUBTOTAL | - | - | - | - | - | |
| VOLUNTEER FF RELIEF ASSOCIATION | ||||||
| VOL.FIRE RELIEF ASSOC.- EXPENSE | 01411 5250 | 121,682 | 121,682 | 123,000 | 152,332 | 156,902 |
| VOL.FIRE RELIEF ASSOC.- REVENUE | 01355 1000 | 121,682 | 121,682 | 123,000 | 152,332 | 156,902 |
| SUBTOTAL | 0 | 0 | - | - | - | |
| PENSION FIREFIGHTERS | ||||||
| FF PENSION - EXPENSE | 01483 5320 | 124,083 | 124,083 | 132,074 | 132,074 | 136,366 |
| FF PENSION - REVENUE (STATE AID) | 01355 0515 | 124,083 | 124,083 | 132,074 | 132,074 | 136,366 |
| SUBTOTAL | - | - | - | - | - | |
EAST GOSHEN TOWNSHIP PASS THRU FUNDS PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Adopted Budget | 2023 Year-End Projection | 2024 PROPOSED Budget |
|---|---|---|---|---|---|---|
| FIREFIGHTERS FUEL CHARGES | ||||||
| FIRE COMPANY FUEL - EXPENSE | 01411 1320 | 25,916 | 25,916 | 32,500 | 32,500 | 33,556 |
| FIRE COMPANY FUEL - REVENUE | 01380 0129 | 25,916 | 25,916 | 32,500 | 32,500 | 33,556 |
| SUBTOTAL | - | - | - | - | - | |
| POLICE PENSION OFFICE STAFF | ||||||
| EXPENSES | ||||||
| POLICE PENSION OFFICE - EXPENSE | 01483 5330 | - | - | - | - | - |
| WEGO POLICE PENSION PLAN EXPENSE | 01410 5250 | |||||
| REVENUES | ||||||
| POLICE PENSION OFFICE - REVENUE | 01380 0140 | |||||
| POLICE PENSION OFFICE - STATE AID | 01355 0520 | - | - | - | - | - |
| WEGO POLICE PENSION PLAN REVENUE | 01355 0525 | |||||
| SUBTOTAL | - | - | - | - | - | |
| TOTAL REVENUES | 2,178,574 | 2,178,574 | 2,404,528 | 2,656,187 | 2,744,733 | |
| TOTAL EXPENSES | 2,178,574 | 2,178,574 | 2,404,528 | 2,656,187 | 2,744,733 | |
| NET RESULTS | 0 | 0 | (0) | (0) | (0) | |
EAST GOSHEN TOWNSHIP OTHER FUNDS PROPOSED 2024 BUDGET
STATE LIQUID FUELS FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 41 | 130 | 564 | 564 | 564 | ||||
| REVENUE | |||||||||
| STATE INTEREST EARNINGS | 02341 1000 | 454 | 6,511 | 7,750 | 11,820 | 12,000 | 180 | 1.5% | 4,250 |
| STATE LIQUID FUELS | 02355 0300 | 510,994 | 515,255 | 517,250 | 517,250 | 530,000 | 12,750 | 2.5% | 12,750 |
| TOTAL REVENUE | 511,448 | 521,766 | 525,000 | 529,070 | 542,000 | 12,930 | 2.4% | 17,000 | |
| EXPENSES | |||||||||
| MINOR EQUIPMENT - VEHICLE | 02430 2600 | 15,632 | 8,205 | 5,000 | 5,000 | 15,000 | 10,000 | 10,000 | |
| SNOW - MATERIALS & SUPPLIES | 02432 2450 | 63,194 | 1,674 | 60,000 | 60,000 | 10,000 | (50,000) | -83.3% | (50,000) |
| SNOW-EQUIPMENT RENTAL | 02432 3840 | 19,878 | 15,418 | 20,000 | 20,000 | 16,500 | (3,500) | -17.5% | (3,500) |
| MATERIALS & SUPPLIES | 02433 2450 | - | - | - | - | - | - | - | |
| MAINT. & REPAIRS-TRAF.SIG | 02433 3720 | 6,781 | 14,148 | 15,000 | 19,070 | 14,000 | (5,070) | -26.6% | (1,000) |
| STREET LIGHTING | 02434 3720 | 9,415 | - | - | - | - | - | - | |
| STORM WATER MATERIALS & SUPPLIES | 02436 2450 | 30,649 | 1,208 | 40,000 | 40,000 | 1,500 | (38,500) | -96.3% | (38,500) |
| STORM WATER - EQUIPMENT RENTAL | 02436 3840 | 39,453 | 15,020 | 10,000 | 10,000 | 15,000 | 5,000 | 5,000 | |
| MATERIALS & SUPPLIES | 02438 2450 | 18,845 | - | 60,000 | 60,000 | - | - | 0.0% | (60,000) |
| HIGHWAYS--RESURFACING | 02438 2455 | 208,561 | 359,945 | 240,000 | 240,000 | 360,000 | 120,000 | 50.0% | 120,000 |
| TREE REMOVAL | 02438 2460 | 42,637 | 39,353 | 40,000 | 40,000 | 40,000 | - | 0.0% | - |
| EQUIPMENT RENTAL | 02438 3840 | 41,436 | 33,707 | 30,000 | 30,000 | 35,000 | 5,000 | 16.7% | 5,000 |
| RESURFACING EQUIP.RENTALS | 02438 3845 | 14,879 | 32,655 | 5,000 | 5,000 | 35,000 | 30,000 | 600.0% | 30,000 |
| TOTAL EXPENSES | 511,359 | 521,332 | 525,000 | 529,070 | 542,000 | 12,930 | 2.4% | 17,000 | |
| NET RESULT FROM OPERATIONS | 89 | 434 | - | - | - | (0) | - | ||
| ESTIMATED ENDING FUND BALANCE | 130 | 564 | 564 | 564 | 564 | ||||
CAPITAL RESERVE FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 5,019,917 | 4,873,286 | 5,232,573 | 5,232,573 | 5,505,325 | ||||
| REVENUE | |||||||||
| INTEREST - CAPITAL RESERVE FUND | 03341 1000 | 1,852 | 65,861 | 60,000 | 217,991 | 200,000 | (17,991) | -8.3% | 140,000 |
| PROCEEDS FROM SALE OF MACH & EQUIP | 03341 2000 | 77,100 | - | - | 53,200 | - | (53,200) | -100.0% | - |
| DCNR PLAYGROUND GRANT | 03354 0700 | - | - | - | - | - | - | - | |
| DVRPC BRIDGE GRANT | 03354 2000 | - | - | - | - | - | - | - | |
| Segment C-E TAP/CMAQ Grant | 03354 3100 | 790,113 | 59,776 | - | - | - | - | - | |
| DCNR C2P2 | 03354 4000 | 88,509 | - | - | - | - | - | - | |
| CFA DAM GRANT | 03354 4002 | - | - | - | - | - | - | - | |
| C2P2 DAM GRANT-MILLTOWN | 03354 4003 | - | - | - | - | - | - | - | |
| C2P2 DAM GRANT LWCF-HERSHEY'S MILL | 03354 4004 | - | - | 380,000 | 380,000 | - | (380,000) | -100.0% | (380,000) |
| GTPR DAM GRANT | 03354 4005 | - | 250,000 | - | - | - | - | - | |
| LANDMARK PENALTY DAM GRANT | 03354 4006 | - | - | - | - | - | - | - | |
| MISC. CAPITAL REVENUE | 03380 1000 | - | - | - | - | - | - | - | |
| PLAYGROUND DONATIONS | 03387 6000 | - | - | - | - | - | - | - | |
| INSURANCE CLAIMS | 03391 2000 | - | - | - | - | - | - | - | |
| CAP.REPLAC.-TRANSF.-OFFICE | 03392 0800 | 13,779 | 29,619 | 6,719 | 6,719 | 12,000 | 5,281 | 78.6% | 5,281 |
| CAP.PURCHASE TRANSF.-TWP.BLDG. | 03392 0801 | 52,608 | 108,604 | 45,000 | 46,174 | 40,000 | (6,174) | -13.4% | (5,000) |
| CAP.REPLACEMENT TRANSF.-TWP.BLDG. | 03392 0802 | 169,157 | 365,305 | 46,174 | 45,000 | 45,000 | - | 0.0% | (1,174) |
| CAP. REPLACEMENT TRANSF.-HIGHWAY | 03392 0804 | 185,855 | 404,797 | 147,358 | 147,358 | 145,000 | (2,358) | -1.6% | (2,358) |
| CAP.PURCHASE-TRANSF.-HIGHWAY | 03392 0805 | 8,596 | 19,746 | 28,000 | 28,000 | 30,000 | 2,000 | 7.1% | 2,000 |
| CAP.REPLACEMENT -TRANSF.-PARK | 03392 0806 | 27,916 | 59,239 | 18,977 | 20,000 | 44,700 | 24,700 | 123.5% | 25,723 |
| CAP.PURCHASE - TRANSF. - PARK | 03392 0807 | - | - | 300,647 | 81,000 | - | - | (300,647) | |
| CAP REPLACEMENT TRANSFER-SOFTWARE | 03392 0808 | 75,500 | - | - | 43,250 | 43,250 | - | 43,250 | |
| CAP PURCHASE TRANSFER-SOFTWARE | 03392 0809 | - | - | - | - | - | - | - | |
| TRANSFER FROM BOND FUND | 03392 0850 | - | - | - | - | - | - | - | |
| TOTAL REVENUE | 1,490,984 | 1,362,948 | 1,032,874 | 1,068,692 | 559,950 | (508,742) | -47.6% | (472,924) | |
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| EXPENSES | |||||||||
| CAPITAL REPLACEMENT - OFFICE EQUIP | 03401 7400 | 13,642 | - | 12,000 | 12,000 | 12,000 | - | 0.0% | - |
| CAPITAL PURCHASE - OFFICE EQUIP | 03401 7450 | - | - | - | 4,147 | - | (4,147) | -100.0% | - |
| CAPITAL REPLACEMENT-SOFTWARE | 03407 7400 | 75,500 | 75,500 | - | 43,250 | - | - | - | |
| CAPITAL REPLACEMENT-TWP BLDG | 03409 7400 | 11,334 | 11,934 | 6,719 | 33,750 | - | (33,750) | -100.0% | (6,719) |
| CAPITAL PURCHASE - TWP BLDG | 03409 7450 | - | 13,480 | 45,000 | - | 45,000 | 45,000 | - | |
| POLICE BUILDING ROOF | 03410 7400 | - | - | - | - | - | - | - | |
| CAPITAL REPLACEMENT - HWY EQUIP | 03430 7400 | 232,703 | 161,242 | 833,000 | 503,191 | 445,000 | (58,191) | -11.6% | (388,000) |
| CAPITAL PURCHASE - HWY EQUIP | 03430 7450 | - | - | - | 35,000 | 565,000 | 530,000 | 1514.3% | 565,000 |
| CAPITAL REPLACEMENT - PARK & REC | 03454 7400 | - | 3,675 | - | - | - | - | - | |
| CAPITAL PURCHASE - PARK & REC | 03454 7450 | - | 7,178 | 216,000 | 108,000 | 52,000 | (56,000) | -51.9% | (164,000) |
| CAPITAL - HERSHEY MILL REPAIR | 03457 7450 | 394,361 | 668,705 | - | 55,222 | - | (55,222) | -100.0% | - |
| CAPITAL - MILLTOWN DAM NEW | 03458 7400 | 41,600 | - | 1,347,283 | - | - | - | (1,347,283) | |
| CAPITAL REPLACEMENT - MILLTOWN DAM | 03458 7450 | - | - | - | - | - | - | - | |
| PAOLI PK.TRAIL - SEGMT.A | 03460 7401 | 520,569 | 23,227 | - | - | - | - | - | |
| PAOLI PK.TRAIL - SEGMT.B | 03460 7402 | - | - | - | - | 400,000 | 400,000 | 400,000 | |
| PAOLI PK.TRAIL - SEGMT.C | 03460 7403 | 312,739 | 35,678 | - | - | - | - | - | |
| PAOLI PK.TRAIL - SEGMT.D | 03460 7404 | 14,507 | 774 | - | - | - | - | - | |
| PAOLI PK.TRAIL - SEGMT.E | 03460 7405 | 14,507 | 774 | - | - | - | - | - | |
| PAOLI PK.TRAIL - SEGMT.F | 03460 7406 | - | - | - | - | - | - | - | |
| PAOLI PK.TRAIL - SEGMT.G | 03460 7407 | - | - | - | - | - | - | - | |
| MISC. CAPITAL REPLACEMENT | 03480 7400 | 5,052 | - | - | - | - | - | - | |
| BANK FEES | 03491 5001 | 1,104 | 1,495 | 1,380 | 1,380 | 1,380 | - | - | |
| TRANSFER TO SEWER CAP RESERVE FUND | 03492 0900 | - | - | - | - | - | - | - | |
| TOTAL EXPENSES | 1,637,616 | 1,003,660 | 2,461,382 | 795,939 | 1,520,380 | 724,441 | 91.0% | (941,002) | |
| NET RESULT FROM OPERATIONS | (146,631) | 359,287 | (1,428,508) | 272,753 | (960,430) | (1,233,183) | 468,078 | ||
| ESTIMATED ENDING FUND BALANCE | 4,873,286 | 5,232,573 | 3,804,065 | 5,505,325 | 4,544,895 | ||||
TRANSPORTATION FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 609,337 | 610,353 | 468,926 | 468,926 | 491,905 | ||||
| Impact Fees | 344,200 | 344,520 | 349,804 | 349,804 | 364,430 | ||||
| Non Impact Fees | 265,137 | 265,833 | 119,121 | 119,121 | 127,475 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 04341 1000 | 330 | 1,802 | 500 | 8,354 | 7,500 | (854) | -10.2% | 7,000 |
| INTEREST - IMPACT FEE | 04341 1010 | 319 | 5,285 | 250 | 14,626 | 12,000 | (2,626) | -18.0% | 11,750 |
| IMPACT FEES | 04387 1010 | 396 | 396 | 1,000 | - | - | - | (1,000) | |
| TOTAL REVENUE | 1,046 | 7,483 | 1,750 | 22,979 | 19,500 | (3,479) | -15.1% | 17,750 | |
| EXPENSES | |||||||||
| TRAFFIC STUDY | 04439 6040 | - | - | - | - | - | - | - | |
| PAOLI PIKE @ APPLEBROOK PARK | 04439 6070 | - | - | - | - | - | - | - | |
| ROUTE 3 ADAPTIVE SIGNALS | 04439 6076 | - | - | - | - | - | - | - | |
| BOOT RD WIDENING | 04439 6077 | - | 148,889 | - | - | - | - | - | |
| MISCELLANEOUS FEES | 04439 6080 | 30 | 21 | 32 | - | - | - | (32) | |
| PAOLI & AIRPORT SIGNAL | 04439 6081 | - | - | - | - | - | - | - | |
| TOTAL EXPENSES | 30 | 148,910 | 32 | - | - | - | (32) | ||
| NET RESULT FROM OPERATIONS | 1,016 | (141,427) | 1,718 | 22,979 | 19,500 | (3,479) | 17,782 | ||
| ESTIMATED ENDING FUND BALANCE | 610,353 | 468,926 | 470,644 | 491,905 | 511,405 | ||||
| Impact Fees | 344,520 | 349,804 | 350,054 | 364,430 | 376,430 | ||||
| Non Impact Fees | 265,833 | 119,121 | 120,589 | 127,475 | 134,975 | ||||
SEWER OPERATING FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 1,000,248 | 1,021,129 | 1,158,670 | 1,158,670 | 971,770 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 05341 1000 | 418 | 7,664 | 12,000 | 35,191 | 30,000 | (5,191) | -14.8% | 18,000 |
| REVENUE - SEWER FEES | 05364 1000 | 3,546,858 | 3,749,490 | 4,148,573 | 3,895,183 | 3,895,183 | - | 0.0% | (253,390) |
| REVENUE - SEWER PENALTIES | 05364 1010 | 28,773 | 34,559 | 45,076 | 27,476 | 27,476 | - | 0.0% | (17,600) |
| REVENUE - LIEN PAYMENTS | 05364 1025 | 72,133 | 52,830 | 69,614 | 19,678 | 19,678 | - | 0.0% | (49,936) |
| REVENUE - SEWER CERTIFICATION FEES | 05364 1030 | 2,380 | 4,270 | 4,000 | 2,173 | 2,173 | - | 0.0% | (1,827) |
| REVENUE - WG CONVEYANCE FEE | 05364 1040 | 15,935 | 22,649 | 20,935 | 54,571 | 54,571 | - | 0.0% | 33,636 |
| ADMIN.COST FROM WESTTOWN | 05364 1060 | 4,827 | 2,896 | 4,827 | 4,713 | 4,713 | - | 0.0% | (113) |
| O&M FEES FOR BARKWAY PUMP STATION | 05364 1070 | 21,625 | 12,562 | 21,625 | 22,666 | 22,666 | - | 0.0% | 1,041 |
| O&M FEES FOR ASHBRIDGE PUMP STATION | 05364 1080 | 1,807 | - | 1,807 | 4,867 | 4,867 | - | 0.0% | 3,059 |
| MISCELLANEOUS SEWER REVENUE | 05380 1000 | 181 | - | - | - | - | - | - | |
| SEWER INSURANCE CLAIMS | 05391 2000 | 8,845 | - | - | - | - | - | - | |
| TOTAL REVENUE | 3,703,781 | 3,886,920 | 4,328,456 | 4,066,518 | 4,061,327 | (5,191) | -0.1% | (267,129) | |
| CHESTER CREEK EXPENSES | |||||||||
| C.C. METERS -WAGES | 05420 1400 | 12,891 | 14,175 | 19,169 | 2,043 | 2,104 | 61 | 3.0% | (17,064) |
| C.C. INTERCEPTOR - WAGES | 05420 1401 | 5,204 | 16,865 | 3,985 | 21,942 | 22,600 | 658 | 3.0% | 18,615 |
| C.C. COLLECTION - WAGES | 05420 1402 | 38,874 | 28,629 | 40,637 | 35,151 | 36,205 | 1,055 | 3.0% | (4,432) |
| C.C. COLLECTION - WAGES - I&I | 05420 1404 | 13,297 | 1,282 | 2,015 | - | - | - | (2,015) | |
| ASHBRIDGE WAGES | 05420 1405 | 13,531 | 11,284 | 12,844 | 8,427 | 8,680 | 253 | 3.0% | (4,164) |
| MILL VALLEY - WAGES | 05420 1406 | 7,584 | 10,925 | 22,762 | 7,968 | 8,207 | 239 | 3.0% | (14,555) |
| C.C. METERS -VEHICLE OPER. | 05420 2510 | 9,406 | 10,286 | 7,199 | 1,304 | 1,343 | 39 | 3.0% | (5,856) |
| C.C. INTERCPT-VEHICLE OPER | 05420 2511 | 2,318 | 13,750 | 3,649 | 15,923 | 16,401 | 478 | 3.0% | 12,752 |
| C.C. COLLEC.-VEHICLE OPER. | 05420 2512 | 23,191 | 16,508 | 14,741 | 37,309 | 38,428 | 1,119 | 3.0% | 23,688 |
| C.C. COLLECT.-VEH OPER - I&I | 05420 2514 | 6,547 | 778 | 817 | - | - | - | (817) | |
| ASHBRIDGE - VEHICLE OPER | 05420 2515 | 5,428 | 5,917 | 3,684 | 5,792 | 5,965 | 174 | 3.0% | 2,281 |
| MILL VALLEY - VEHICLE OPER | 05420 2516 | 3,270 | 5,991 | 17,224 | 5,358 | 5,518 | 161 | 3.0% | (11,706) |
| C.C. METERS - UTILITIES | 05420 3600 | 121 | 125 | 135 | 107 | 110 | 3 | 3.0% | (25) |
| C.C. INTERCEPTOR-UTILITIES | 05420 3601 | 1,345 | 1,442 | 1,377 | 1,554 | 1,601 | 47 | 3.0% | 224 |
| C.C. COLLECTION -UTILITIES | 05420 3602 | 6,885 | 8,741 | 6,949 | 8,785 | 9,048 | 264 | 3.0% | 2,099 |
| ASHBRIDGE - UTILITIES | 05420 3603 | 5,991 | 6,492 | 7,172 | 6,362 | 6,553 | 191 | 3.0% | (619) |
| MILL VAL./BARKWAY UTILITIES | 05420 3604 | 3,695 | 4,449 | 3,900 | 4,231 | 4,358 | 127 | 3.0% | 458 |
| C.C. METERS-MAINT.& REPRS. | 05420 3700 | 3,732 | 13,616 | 11,176 | 6,388 | 6,580 | 192 | 3.0% | (4,596) |
| C.C. INTERCEPT.-MAINT.&REP | 05420 3701 | 5,432 | 12,902 | 3,142 | 4,540 | 4,676 | 136 | 3.0% | 1,535 |
| C.C. COLLEC.-MAINT.& REPR. | 05420 3702 | 64,812 | 41,160 | 118,968 | 139,082 | 50,000 | (89,082) | -64.1% | (68,968) |
| C.C. INTERCEPT.-MAINT & REP - I&I | 05420 3703 | 3,843 | 5,499 | 5,774 | 4,824 | 4,969 | 145 | 3.0% | (805) |
| C.C. COLLECT.-MAINT & REP - I&I | 05420 3704 | 15,083 | 7,844 | 8,237 | 8,782 | 9,045 | 263 | 3.0% | 808 |
| ASHBRIDGE-MAINT.&REPR | 05420 3705 | 5,084 | 19,203 | 16,188 | 267 | 9,275 | 9,008 | 3378.0% | (6,914) |
| BARKWAY -MAINT.& REPR. | 05420 3706 | 2,204 | 525 | 1,409 | 133 | 137 | 4 | 3.0% | (1,271) |
| C.C. WEST GOSHEN OPER/MAINT | 05420 3850 | 608,660 | 539,224 | 700,000 | 985,655 | 992,000 | 6,345 | 0.6% | 292,000 |
| TOTAL CHESTER CREEK EXPENSES | 868,427 | 797,613 | 1,033,152 | 1,311,926 | 1,243,804 | (68,121) | -5.2% | 210,652 | |
31
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| RIDLEY CREEK EXPENSES | |||||||||
| R.C. STP- WAGES | 05422 1400 | 11,501 | 49,539 | 20,696 | 66,857 | 68,862 | 2,006 | 3.0% | 48,166 |
| R.C. COLLEC.- WAGES | 05422 1401 | 84,660 | 33,001 | 60,000 | 54,940 | 56,589 | 1,648 | 3.0% | (3,411) |
| R.C. COLLECTIONS WAGES I&I | 05422 1402 | 8,198 | 10,326 | 7,223 | - | - | - | (7,223) | |
| R.C. STP- CHEMICALS | 05422 2440 | 109,686 | 123,321 | 116,295 | 108,635 | 111,894 | 3,259 | 3.0% | (4,401) |
| R.C. COLLEC.-CHEMICALS | 05422 2441 | - | - | - | 7,356 | 7,577 | 221 | 3.0% | 7,577 |
| R.C. STP-VEHICLE OPER. | 05422 2510 | 3,372 | 45,071 | 5,918 | 61,240 | 63,078 | 1,837 | 3.0% | 57,160 |
| R.C. COLLEC-VEHICLE OPER. | 05422 2511 | 49,686 | 17,514 | 14,802 | 15,505 | 15,970 | 465 | 3.0% | 1,167 |
| R.C. COLLECT.-VEH OPERATING - I&I | 05422 2512 | 4,222 | 7,545 | 3,631 | - | - | - | (3,631) | |
| R.C. STP-MINOR EQUIP. | 05422 2600 | 2,127 | - | - | - | 15,600 | 15,600 | 15,600 | |
| R.C STP -UTILITIES | 05422 3600 | 99,795 | 90,915 | 121,961 | 89,636 | 92,325 | 2,689 | 3.0% | (29,636) |
| R.C. COLLEC.-UTILITIES | 05422 3601 | 7,533 | 7,259 | 8,239 | 5,777 | 5,950 | 173 | 3.0% | (2,289) |
| R.C. STP-MAINT.& REPAIRS | 05422 3700 | 93,876 | 100,546 | 143,381 | 82,874 | 85,360 | 2,486 | 3.0% | (58,020) |
| R.C. COLLEC.-MAINT.& REPR | 05422 3701 | 72,762 | 57,922 | 62,172 | 46,073 | 47,455 | 1,382 | 3.0% | (14,717) |
| R.C. COLLECTION-MAINT. & REP I&I | 05422 3702 | 6,438 | 32,078 | 28,941 | 30,959 | 31,888 | 929 | 3.0% | 2,946 |
| RCSTP - APPLEBROOK | 05422 3703 | - | - | - | 9,393 | 9,675 | |||
| R.C. STP-CONTRACTED SERV. | 05422 4500 | 192,074 | 214,511 | 221,578 | 204,914 | 211,062 | 6,147 | 3.0% | (10,516) |
| R.C. SLUDGE-LAND CHESTER | 05422 4502 | 43,070 | 44,208 | 43,971 | 52,681 | 54,262 | 1,580 | 3.0% | 10,291 |
| TOTAL RIDLEY CREEK EXPENSES | 789,000 | 833,754 | 858,809 | 836,840 | 877,545 | 40,423 | 4.8% | 18,737 | |
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ADMINISTRATION | |||||||||
| MISCELLANEOUS EXPENSE | 05424 2700 | 182 | 182 | 201 | 243 | 250 | 7 | 3.0% | 49 |
| ADMIN.- WAGES | 05429 1400 | 86,208 | 114,216 | 89,220 | 84,468 | 87,002 | 2,534 | 3.0% | (2,217) |
| PA ONE CALL - WAGES | 05429 1401 | 1,723 | 6,801 | 3,424 | 8,904 | 9,171 | 267 | 3.0% | 5,748 |
| PA ONE CALL - VEH OPER | 05429 2501 | - | 2,180 | - | 8,473 | 8,727 | 8,727 | ||
| ADMIN.-COMPUTER EXPENSES | 05429 2600 | - | - | 6,388 | - | - | - | (6,388) | |
| ADMIN.-GENERAL EXPENSE | 05429 3000 | 36,162 | 37,811 | 1,029 | 1,274 | 1,312 | 38 | 3.0% | 282 |
| ADMIN.-PAYMENT PORTAL | 05429 3001 | 6,891 | 7,661 | 5,431 | 7,585 | 7,812 | 228 | 3.0% | 2,382 |
| ADMIN.- PROFESSIONAL SERV | 05429 3100 | 1,965 | 2,000 | 2,065 | 2,619 | 2,698 | 79 | 3.0% | 633 |
| ADMIN - LEGAL | 05429 3140 | 4,616 | 675 | 3,530 | 1,249 | 1,287 | 37 | 3.0% | (2,243) |
| ADMIN.- POSTAGE | 05429 3250 | 4,726 | 5,175 | 5,053 | 5,322 | 5,482 | 160 | 3.0% | 429 |
| ADMIN. - PRINTING | 05429 3400 | 722 | 2,061 | 1,731 | 1,945 | 2,003 | 58 | 3.0% | 272 |
| ADMIN.- INSURANCE | 05429 3500 | 33,963 | 32,611 | 26,901 | 46,454 | 47,847 | 1,394 | 3.0% | 20,947 |
| ADMIN.-BLDG.OVERHEAD | 05429 3730 | 58,801 | 65,814 | 88,760 | 88,760 | 91,423 | 2,663 | 3.0% | 2,663 |
| CONTR. SERV. SUMMIT HOUSE | 05429 4500 | 349,320 | 369,000 | 385,125 | 385,125 | 396,679 | 11,554 | 3.0% | 11,554 |
| CONTR. SERV. CIDER KNOLL | 05429 4510 | 78,720 | 59,040 | 86,789 | 86,789 | 89,392 | 2,604 | 3.0% | 2,604 |
| CONTR. SERV. MALVERN INSTITUTE | 05429 4520 | 7,446 | 7,949 | 10,732 | 10,732 | 11,054 | 322 | 3.0% | 322 |
| LOCK BOX FEE | 05429 5000 | - | - | 3,859 | - | - | - | (3,859) | |
| Bank Fees | 05429 5001 | 1,311 | 1,495 | 1,380 | 1,380 | 1,380 | - | - | |
| DVRFA--PRINCIPAL PMT ON $9,500,000 | 05471 7220 | 389,000 | 405,000 | 421,000 | 421,000 | 438,000 | 17,000 | 4.0% | 17,000 |
| DVRFA - PRINCIPAL ON DIVERSION LOAN | 05471 7240 | 114,000 | 117,000 | 121,000 | 121,000 | 125,000 | 4,000 | 3.3% | 4,000 |
| SERIES 2017 GO BONDS - PRINCIPAL | 05471 7250 | 120,000 | 125,000 | 130,000 | 130,000 | 135,000 | 5,000 | 3.8% | 5,000 |
| DVRFA - INTEREST ON $9,500,000 LOAN | 05472 7220 | 223,839 | 208,118 | 191,763 | 191,763 | 174,755 | (17,008) | -8.9% | (17,008) |
| DVRFA - INTEREST ON DIVERSION LOAN | 05472 7240 | 53,952 | 50,453 | 47,778 | 47,778 | 44,089 | (3,689) | -7.7% | (3,689) |
| SERIES 2017 GO BONDS - INTEREST | 05472 7250 | 71,589 | 66,789 | 61,789 | 61,789 | 59,189 | (2,600) | -4.2% | (2,600) |
| TRANSFER TO MUNIC AUTHORITY | 05492 0700 | 90,338 | 90,979 | 100,000 | 100,000 | 100,000 | - | 0.0% | - |
| TRANSFER TO BOND FUND - SEWER | 05492 0805 | - | 50,000 | - | - | - | - | - | |
| TRANSFER TO SEWER CAPITAL RESERVE | 05492 0900 | 290,000 | 290,000 | 800,706 | 290,000 | 290,000 | - | 0.0% | (510,706) |
| TOTAL ADMINISTRATIVE EXPENSES | 2,025,473 | 2,118,013 | 2,595,652 | 2,104,652 | 2,129,553 | 24,647 | 1.2% | (466,099) | |
| TOTAL SEWER EXPENSES | 3,682,900 | 3,749,379 | 4,487,612 | 4,253,418 | 4,250,903 | (3,051) | -0.1% | (236,710) | |
| NET RESULT FROM OPERATIONS | 20,881 | 137,541 | (159,156) | (186,900) | (189,575) | (2,676) | (30,419) | ||
| ESTIMATED ENDING FUND BALANCE | 1,021,129 | 1,158,670 | 999,513 | 971,770 | 782,194 | ||||
REFUSE FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 530,140 | 494,810 | 564,927 | 564,927 | 326,854 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 06341 1000 | 165 | 3,208 | 6,000 | 12,271 | 10,000 | (2,271) | -18.5% | 4,000 |
| REVENUE - REFUSE FEES | 06364 2000 | 994,965 | 1,314,802 | 1,317,332 | 1,276,889 | 1,276,889 | - | 0.0% | (40,443) |
| REVENUE - REFUSE PENALTIES | 06364 2010 | 9,743 | 11,254 | 10,853 | 9,557 | 9,557 | - | 0.0% | (1,296) |
| REVENUE - LIEN PAYMENTS | 06364 2025 | 26,313 | 19,836 | 24,713 | 7,458 | 7,458 | - | 0.0% | (17,256) |
| REVENUE - REFUSE CERTIFICATION FEES | 06364 2030 | 1,250 | 2,435 | 2,250 | 1,300 | 1,300 | - | 0.0% | (950) |
| REVENUE - MISCELLANEOUS GRANTS | 06364 2040 | 38,694 | 58,191 | 30,710 | 30,710 | 30,710 | - | 0.0% | - |
| MISCELLANEOUS REFUSE REVENUE | 06380 1000 | 3,075 | - | 168,000 | - | 168,000 | 168,000 | - | |
| TOTAL REVENUE | 1,074,206 | 1,409,725 | 1,559,859 | 1,338,185 | 1,503,914 | 165,729 | 12.4% | (55,945) | |
| EXPENSES | |||||||||
| REFUSE - WAGES | 06427 1400 | 65,889 | 76,257 | 71,400 | 59,419 | 61,202 | 1,783 | 3.0% | (10,198) |
| MATERIALS & SUPPLIES | 06427 2440 | 5,686 | 5,095 | 159,000 | 159,000 | 163,770 | 4,770 | 3.0% | 4,770 |
| GENERAL EXPENSE | 06427 3000 | 130 | 150 | 215 | 200 | 206 | 6 | 3.0% | (9) |
| ADMIN - PAYMENT PORTAL | 06427 3001 | 6,891 | 7,661 | 7,250 | 7,250 | 7,468 | 218 | 3.0% | 218 |
| PROFESSIONAL SERVICES | 06427 3100 | - | - | 17,667 | 17,667 | - | (17,667) | -100.0% | (17,667) |
| LEGAL SERVICES | 06427 3140 | 4,616 | 675 | 5,000 | 5,000 | 5,000 | - | 0.0% | - |
| POSTAGE | 06427 3250 | 4,726 | 5,175 | 15,250 | 15,250 | 6,000 | (9,250) | -60.7% | (9,250) |
| ADVERTISING & PRINTING | 06427 3400 | 722 | 2,061 | 2,000 | 1,113 | 1,146 | 33 | 3.0% | (854) |
| ADMIN.BLDG.OVERHEAD | 06427 3730 | 5,976 | 9,515 | 8,000 | 9,317 | 10,000 | 683 | 7.3% | 2,000 |
| CONTRACTED SERV. | 06427 4500 | 694,920 | 913,018 | 985,606 | 972,000 | 1,001,160 | 29,160 | 3.0% | 15,554 |
| LANDFILL FEES | 06427 4502 | 308,812 | 302,094 | 322,938 | 276,667 | 284,967 | 8,300 | 3.0% | (37,972) |
| COUNTY-HAZARD.WASTE PROG. | 06427 4503 | - | - | - | - | - | - | - | |
| RECYCLING FEES | 06427 4504 | 10,546 | 17,159 | 10,000 | 52,800 | 54,384 | 1,584 | 3.0% | 44,384 |
| LOCK BOX FEE | 06427 5000 | - | - | - | - | - | - | - | |
| Bank Fees | 06427 5001 | 621 | 748 | 500 | 575 | 592 | 17 | 3.0% | 92 |
| TRANSFER TO CREDIT CARD FUND | 06492 0110 | - | - | - | - | - | - | - | |
| TOTAL EXPENSES | 1,109,535 | 1,339,609 | 1,604,826 | 1,576,258 | 1,595,895 | 19,637 | 1.2% | (8,932) | |
| NET RESULT FROM OPERATIONS | (35,330) | 70,116 | (44,967) | (238,073) | (91,981) | 146,092 | (47,014) | ||
| ESTIMATED ENDING FUND BALANCE | 494,810 | 564,927 | 519,959 | 326,854 | 234,873 | ||||
MUNICIPAL AUTHORITY, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 6,372 | 11,619 | 5,171 | 5,171 | 5,171 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 07341 1000 | 3 | 7 | - | 290 | - | (290) | -100.0% | - |
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | - | - | - | - | - | - | - | |
| DCED GRANT | 07354 0400 | - | - | 152,980 | - | - | - | (152,980) | |
| C.C. TAPPING FEES | 07364 1100 | 2,060 | 2,300 | 2,300 | 2,300 | 2,300 | - | 0.0% | - |
| R.C.TAPPING FEES | 07364 1110 | 11,508 | 2,089 | 2,000 | 8,574 | 8,574 | - | 0.0% | 6,574 |
| CONNECTION FEES - SEWER | 07364 1130 | 3,368 | 564 | 1,000 | 1,128 | 1,128 | - | 0.0% | 128 |
| MISCELLANEOUS REVENUE (PINE ROCK) | 07380 1000 | 2,664 | 282 | 282 | 564 | 564 | - | 0.0% | 282 |
| TRANSFER FROM GENERAL ACCT | 07392 0100 | - | - | - | - | - | - | - | |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 90,338 | 90,979 | 100,000 | 117,764 | 109,517 | (8,247) | -7.0% | 9,517 |
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | - | - | - | - | - | - | - | |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 179,592 | 286,657 | 1,471,553 | 635,907 | 837,464 | 201,557 | 31.7% | (634,089) |
| TOTAL REVENUE | 289,534 | 382,879 | 1,730,115 | 766,527 | 959,547 | 193,020 | 25.2% | (770,568) | |
| EXPENSES | |||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 30,920 | 33,488 | 32,055 | 38,687 | 39,847 | 1,161 | 3.0% | 7,792 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 1,693 | 1,665 | 1,749 | 3,191 | 3,286 | 96 | 3.0% | 1,538 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 10,000 | 10,250 | 10,815 | 21,000 | 21,630 | 630 | 3.0% | 10,815 |
| ENGINEERING SERVICES | 07424 3130 | 55,389 | 42,469 | 47,250 | 47,250 | 48,668 | 1,418 | 3.0% | 1,418 |
| LEGAL SERVICES | 07424 3140 | 9,194 | 6,640 | 8,400 | 8,400 | 8,652 | 252 | 3.0% | 252 |
| R.C. CAPITAL-STP | 07424 7440 | - | - | 355,793 | - | - | - | (355,793) | |
| CAP.REPLACEMENT R.C. | 07424 7490 | (10,985) | - | 488,847 | - | 310,500 | 310,500 | (178,347) | |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | - | - | - | - | - | - | - | |
| TALLMADGE DRIVE | 07426 3000 | - | - | - | - | - | - | - | |
| RELINING | 07426 3001 | - | - | 260,000 | 260,000 | - | (260,000) | -100.0% | (260,000) |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | - | - | - | - | - | - | - | |
| BARKWAY PUMP STATION CAPITAL | 07429 1501 | 5,117 | 2,215 | - | - | - | - | - | |
| ASHBRIDGE PUMP STATION CAPITAL | 07429 1502 | 30,324 | 11,493 | - | - | - | - | - | |
| HERSHEYS MILL PUMP STATION CAPITAL | 07429 1503 | 76,693 | 153,399 | 78,000 | 78,000 | 85,000 | 7,000 | 9.0% | 7,000 |
| HUNT CO PUMP STATION CAPITAL | 07429 1504 | 8,277 | 1,870 | - | - | - | - | - | |
| RCSTP CAPITAL | 07429 1505 | 67,251 | 125,837 | 260,000 | 260,000 | 366,964 | 106,964 | 41.1% | 106,964 |
| WEST GOSHEN CAPITAL | 07429 6100 | - | - | 187,206 | 50,000 | 75,000 | 25,000 | 50.0% | (112,206) |
| Bank Fees | 07491 5001 | 414 | - | - | - | - | - | - | |
| TRANSFER TO GENERAL FUND | 07492 0100 | - | - | - | - | - | - | - | |
| TOTAL EXPENSES | 284,287 | 389,327 | 1,730,115 | 766,527 | 959,547 | 193,020 | 25.2% | (770,568) | |
| NET RESULT FROM OPERATIONS | 5,247 | (6,448) | 0 | (0) | 0 | 1 | 0 | ||
| ESTIMATED ENDING FUND BALANCE | 11,619 | 5,171 | 5,172 | 5,171 | 5,171 | ||||
BOND FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 3,184,623 | 2,787,774 | 2,346,068 | 2,346,068 | 1,295,326 | ||||
| General Fund Portion | 2,391,418 | 1,997,152 | 1,890,227 | 1,890,227 | 1,295,326 | ||||
| Sewer Portion | 793,205 | 790,622 | 455,842 | 455,842 | 0 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 08341 1000 | 487 | 28,211 | 30,000 | 86,693 | 71,243 | (15,450) | -17.8% | 41,243 |
| INTEREST - SEWER | 08341 1010 | 133 | 9,720 | 1,500 | 2,500 | - | (2,500) | -100.0% | (1,500) |
| TRANSFER FROM SEWER FUND | 08392 0500 | - | 50,000 | - | - | - | - | - | |
| TOTAL REVENUE | 487 | 78,211 | 31,500 | 86,693 | 71,243 | (15,450) | -17.8% | ||
| WEST GOSHEN STP IMPROVEMENTS | 08429 6000 | 2,583 | 411,392 | 388,224 | 458,341 | - | (458,341) | -100.0% | (388,224) |
| MILLTOWN DAM ENGINEERING | 08454 6010 | 17,576 | 37,430 | 1,215,887 | 182,056 | 182,056 | - | 0.0% | (1,033,832) |
| MILLTOWN DAM CONSTRUCTION | 08454 6020 | - | - | - | 497,038 | 1,009,138 | 512,100 | 103.0% | 1,009,138 |
| HERSHEY'S MILL ENGINEERING | 08454 6050 | 122,495 | 13,920 | - | - | - | - | - | |
| HERSHEY'S MILL CONSTRUCTION | 08454 6060 | - | 39,113 | - | - | - | - | - | |
| MISC TRAIL EXPENSES | 08459 6000 | 105,473 | 17,812 | - | - | - | - | - | |
| SEGMENTS A&B ENGINEERING | 08459 6001 | 125,954 | - | - | - | - | - | - | |
| SEGMENT C ENGINEERING | 08459 6003 | 9,306 | - | - | - | - | - | - | |
| SEGMENTS D&E ENGINEERING | 08459 6005 | 7,002 | - | - | - | - | - | - | |
| SEGMENTS F&G REIMBURSEMENT | 08459 6006 | 6,947 | 250 | - | - | - | - | - | |
| TOTAL EXPENSES | 397,336 | 519,917 | 1,604,111 | 1,137,435 | 1,191,193 | 53,758 | 4.7% | (412,918) | |
| NET RESULT FROM OPERATIONS | (396,849) | (441,706) | (1,572,611) | (1,050,742) | (1,119,950) | (69,208) | 6.6% | 452,661 | |
| ESTIMATED ENDING FUND BALANCE | 2,787,774 | 2,346,068 | 773,457 | 1,295,326 | 175,376 | ||||
| General Fund Portion | 1,997,152 | 1,890,227 | 704,340 | 1,295,326 | 175,375 | ||||
| Sewer Portion | 790,622 | 455,842 | 69,118 | 0 | 0 | ||||
SEWER CAPITAL RESERVE FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 2,250,329 | 2,361,152 | 2,384,772 | 2,384,772 | 2,130,452 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 09341 1000 | 830 | 28,246 | 22,500 | 91,588 | 85,870 | (5,717) | -6.2% | 63,370 |
| TRFR FROM SEWER OP FOR SEWER CAP RESRV | 09342 0500 | 290,000 | 290,000 | 800,706 | 290,000 | 290,000 | - | 0.0% | (510,706) |
| TRANSFER FROM SEWER CAP RESERVE | 09392 0300 | - | - | - | - | - | - | - | |
| TRANSFER FROM MUNICIPAL FUND | 09392 0700 | - | - | - | - | - | - | - | |
| TOTAL REVENUE | 290,830 | 318,246 | 823,206 | 381,588 | 375,870 | (5,717) | -1.5% | (447,336) | |
| EXPENSES | |||||||||
| MACHINERY/EQUIPMENT - REPLACEMENT | 09429 7400 | - | 7,969 | - | - | - | - | - | |
| MACHINERY/EQUIPMENT - NEW | 09429 7450 | - | - | - | - | - | - | - | |
| Bank Fees | 09491 5001 | 414 | - | - | - | - | - | - | |
| TRANSFER TO MUNIC AUTHORITY | 09492 0700 | 179,592 | 286,657 | 1,471,553 | 635,907 | 837,464 | 201,557 | 31.7% | (634,089) |
| TOTAL EXPENSES | 180,006 | 294,626 | 1,471,553 | 635,907 | 837,464 | 201,557 | 31.7% | (634,089) | |
| NET RESULT FROM OPERATIONS | 110,823 | 23,620 | (648,347) | (254,320) | (461,594) | (207,274) | 186,753 | ||
| ESTIMATED ENDING FUND BALANCE | 2,361,152 | 2,384,772 | 1,736,425 | 2,130,452 | 1,668,859 | ||||
OPERATING RESERVE FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 2,630,163 | 2,784,888 | 1,558,608 | 1,558,608 | 1,628,608 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 10341 1000 | 1,022 | 23,720 | 46,500 | 70,000 | 81,430 | 11,430 | 16.3% | 34,930 |
| TRANSFER FROM GENERAL ACCT. | 10392 0100 | 154,117 | - | - | - | - | - | - | |
| SUBTOTAL | 155,139 | 23,720 | 46,500 | 70,000 | 81,430 | 11,430 | 16.3% | ||
| EXPENSES | |||||||||
| Bank Fees | 10491 5001 | 414 | - | - | - | - | - | - | |
| TRANSFER TO INFRASTRUCTURE SUSTAINABILITY FUND | 10492 1200 | - | 1,250,000 | - | - | - | - | - | |
| SUBTOTAL | 414 | 1,250,000 | - | - | - | - | - | ||
| NET RESULT FROM OPERATIONS | 154,725 | (1,226,280) | 46,500 | 70,000 | 81,430 | 11,430 | 16.3% | 34,930 | |
| ESTIMATED ENDING FUND BALANCE | 2,784,888 | 1,558,608 | 1,605,108 | 1,628,608 | 1,710,039 | ||||
ARPA FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | - | 914,664 | 963,936 | 963,936 | 158,340 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 19341 1000 | 44 | 14,173 | - | 12,000 | 1,320 | (10,680) | -89.0% | 1,320 |
| ARPA - COVID RELIEF | 19354 1000 | 949,821 | 955,827 | - | - | - | - | - | |
| SUBTOTAL | 949,865 | 970,000 | - | 12,000 | 1,320 | (10,680) | -89.0% | 1,320 | |
| EXPENSES | |||||||||
| HYBRID MEETING ROOM | 19409 7400 | 35,201 | 769 | - | - | - | - | - | |
| BOARD APPROVED SEWER PROJECTS | 19409 6099 | - | - | - | - | 159,660 | |||
| WTWPS | 19409 6060 | - | 913,244 | - | - | - | - | - | |
| HERSHEY MILL SEWER PROJECT | 19409 6050 | - | 6,716 | - | 817,595 | - | (817,595) | -100.0% | - |
| SUBTOTAL | 35,201 | 920,729 | - | 817,595 | 159,660 | (657,935) | -80.5% | 159,660 | |
| NET RESULT FROM OPERATIONS | 914,664 | 49,272 | - | (805,595) | (158,340) | 647,255 | -80.3% | (158,340) | |
| ESTIMATED ENDING FUND BALANCE | 914,664 | 963,936 | 963,936 | 158,340 | (0) | ||||
INFRASTRUCTURE SUSTAINABILITY FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | - | 339,058 | 1,794,949 | 1,794,949 | 1,775,318 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 12341 1000 | - | 23,609 | 33,000 | 79,747 | 83,766 | 4,018 | 5.0% | 50,766 |
| TRANSFER FROM OPERATING RESERVE FUND | 12392 0110 | - | 1,250,000 | - | - | - | - | - | |
| TRFR FROM GENERAL FUND | 12392 0100 | 339,058 | 200,258 | - | - | - | - | - | |
| SUBTOTAL | 339,058 | 1,473,867 | 33,000 | 79,747 | 83,766 | 4,018 | 5.0% | 50,766 | |
| EXPENSES | |||||||||
| BOW TREE POND 1 | 12454 3707 | - | 17,048 | 500,000 | 99,379 | 91,850 | (7,529) | -7.6% | (408,150) |
| TRFR TO GENERAL FUND | 12492 0100 | - | 927 | - | - | - | - | - | |
| SUBTOTAL | - | 17,975 | 500,000 | 99,379 | 91,850 | (7,529) | -7.6% | (408,150) | |
| NET RESULT FROM OPERATIONS | 339,058 | 1,455,891 | (467,000) | (19,632) | (8,084) | 11,547 | -58.8% | 458,916 | |
| ESTIMATED ENDING FUND BALANCE | 339,058 | 1,794,949 | 1,327,949 | 1,775,318 | 1,767,233 | ||||