Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

East Goshen Township

2024 Proposed General Fund Budget

November 14, 2023

[Seal: TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, INCORPORATED 1817]

1

PROPOSED REVENUE & EXPENSE CHANGES
(from Preliminary to Proposed)

  • As discussions with Thornbury Township continue regarding contracted WEGO services and the cost, we propose an Interfund Operating Transfer from existing General Fund balance of $444K to offset the potential expected shortfall if Thornbury does not sign a contract.
  • The remaining revenue items were discussed at the 10/17 BoS meeting except for an increase in expected State Pension Aid; new number based upon actual 2023.
  • Increased WEGO expense as noted above.
  • Goshen Fire Company contribution 10% above 2023.
  • Good Fellowship Ambulance & EMS Training Institute contribution 16% above 2023.
  • Malvern Fire Company contribution 3% above 2023.
  • Includes updated/reviewed staff payroll and positions.
  • Increased SPCA costs based on new contract.
  • ABC’s budgets set per BoS discussion 10/17.
  • Numerous internal expense line item decreases after review 10/17 in order to return 2024 Proposed General Fund Budget to a Net Zero, neither surplus nor deficit.

Revenue Changes

Amount Description
$ 444,000.00 Interfund Operating Transfer (from General to cover WEGO)
$ 35,000.00 Interest Income
$ 20,000.00 Pension State Aid Revenue
$ 15,000.00 Permit Fee Revenue
$ 12,000.00 Liquid Fuel Interest Income
$ (15,000.00) County Real Estate Processing Fees
$ (10,000.00) Cable Franchise Fees
$501,000.00 Subtotal Revenue

Expense Changes

Amount Description
$ 515,903.22 WEGO Increase
$ 41,788.29 Goshen Fire Contribution/Fire Alarm pass back
$ 24,711.53 Final Staff Salaries & Personnel hires
$ 18,600.00 New S.P.C.A. contract
$ 15,000.00 Futurist Bow Tree Connection Surveys
$ (15,000.00) Paving materials
$ (13,125.00) Stormwater Equip Rental
$ (10,000.00) Paving rental
$ (10,000.00) General Tree Removal
$ (10,000.00) Tree Removal Park
$ (8,579.22) General Expense - Shop
$ (7,500.00) Eliminate 3rd Party Inspectors
$ (7,000.00) Twp. Bldg. - Fuel, light, water
$ (5,000.00) Twp Bldg - Maintenance & Repairs
$ (5,000.00) Communication Expense - no Bee.Net
$ (5,000.00) EIT Commission
$ (4,298.82) Minor Equipment Purchase
$ (3,000.00) Shop - Tools
$ (2,500.00) Legal - Zoning Hearing Board
$ (2,500.00) Park Utilities
$ (2,500.00) Satellite Park Improvement (Ponds) - now InfraFund
$ (2,000.00) Public Works support Community Day
$ (2,000.00) Proportional reduction of ABC Budgets
$501,000.00 Subtotal Expense
$ 0.00 Net

2

General Fund: Revenues, Expenditures & Ending Fund Balance

Bar chart comparing Revenue, Expenditure, Ending Fund Balance, and Surplus/(Deficit) across 2021 Actual, 2022 Actual, 2023 Budget, 2023 Projection, and 2024 Budget, with a vertical scale from $- to $14,000,000 in $1,000,000 increments ($14,000,000; $13,000,000; $12,000,000; $11,000,000; $10,000,000; $9,000,000; $8,000,000; $7,000,000; $6,000,000; $5,000,000; $4,000,000; $3,000,000; $2,000,000; $1,000,000; $-).

YEARREVENUEEXPENDITUREENDING FUND BALANCESURPLUS/ (DEFICIT)
2021 Actual$11,453,479$ 11,389,421$ 5,739,288$ 64,058
2022 Actual$11,987,004$ 11,901,916$ 5,829,155$ 89,867
2023 Budget$12,278,669$ 12,278,669$ 5,829,155$ -
2023 Projection$12,990,547$ 12,665,307$ 6,154,395$ 325,240
2024 Budget$13,229,833$ 13,229,833$ 6,154,395$ -

2024 Proposed Budget is Net Zero, neither a surplus nor deficit.

3

2024 Proposed General Fund Budget Summary

Category2021 Actual2022 Actual2023 Budget2023 Projection2024 Proposed BudgetProp Budget 24 vs 23 ProjProp Budget 24 vs 23 ProjProp Budget 24 vs Budget 23Prop Budget 24 vs Budget 23
REVENUES
LOCAL ENABLING TAXES8,984,6678,995,0359,559,0009,667,4249,643,000(24,424)-0.3%84,0000.9%
LICENSE & PERMITS440,810425,554441,099411,355403,400(7,955)-1.9%(37,699)-8.5%
FINES45,12169,50550,00043,19445,5002,3065.3%(4,500)-9.0%
INTEREST EARNINGS2,750102,835165,759309,075275,000(34,075)-11.0%109,24165.9%
RENTS101,273103,066104,898105,846106,7649180.9%1,8661.8%
STATE SHARED REVENUE & ENTITLEMENT132,289134,604136,250161,508158,650(2,858)-1.8%22,40016.4%
GENERAL GOVERNMENT29,56333,51726,00049,13034,000(15,130)-30.8%8,00030.8%
PUBLIC SAFETY338,687485,063356,200487,652436,092(51,560)-10.6%79,89222.4%
HIGHWAY & STREETS6,4521,0451,9431,5292,00047130.8%572.9%
CULTURE & RECREATION145,109182,721202,362244,637261,72017,0837.0%59,35829.3%
MISCELLANEOUS REVENUE162,702291,531138,157225,998137,707(88,290)-39.1%(450)-0.3%
INTERFUND OPERATING TRANSFERS1,064,0561,162,5281,097,0001,283,1991,726,000442,80134.5%629,00057.3%
TOTAL REVENUES11,453,47911,987,00412,278,66912,990,54713,229,833239,2861.8%951,1657.7%
EXPENSES
GENERAL GOVERNMENT979,1211,071,8161,106,3401,222,4871,141,680(80,807)-6.6%35,3393.2%
TAX COLLECTION119,639119,098120,129113,782120,3856,6025.8%2560.2%
GENERAL GOVERNMENT BLDG & PLANT451,488599,940319,223379,588296,593(82,995)-21.9%(22,630)-7.1%
PUBLIC SAFETY4,444,7624,682,4365,120,9465,082,7315,955,420872,68917.2%834,47416.3%
PLANNING & ZONING395,445373,157384,900391,628431,84040,21210.3%46,94012.2%
RECYCLING13,76015,91217,00016,18920,3784,18925.9%3,37819.9%
PUBLIC WORKS - SANITATION469,210351,289353,982476,009528,70952,70111.1%174,72749.4%
PUBLIC WORKS - HWYS ROADS & STREETS1,812,5652,045,7622,114,7842,302,2952,081,715(220,581)-9.6%(33,069)-1.6%
PARTICIPANT RECREATION215,389296,126324,360381,697389,9478,2502.2%65,58720.2%
PARKS304,147410,528708,086517,499521,4833,9840.8%(186,603)-26.4%
CONSERVATION & DEVELOPMENT4712,2414,0004,0863,189(897)-21.9%(811)-20.3%
HISTORICAL9142,3283,3003,524911(2,613)-74.1%(2,389)-72.4%
DEBT SERVICE576,090550,077548,789549,405461,400(88,005)-16.0%(87,389)-15.9%
PENSION FUND CONTRIBUTION136,373132,827141,100148,345158,70010,3557.0%17,60012.5%
INSURANCE PREMIUMS701,393573,834750,959812,981830,72017,7392.2%79,76110.6%
EMPLOYEE BENEFITS213,833223,966260,770263,059286,76423,7059.0%25,99410.0%
INTERFUND TRANSFERS554,822450,58000000
TOTAL EXPENSES11,389,42111,901,91612,278,66912,665,30713,229,833564,5274.5%951,1657.7%
NET RESULTS FROM OPERATIONS64,05885,0880325,2400
  • When excluding Public Safety Expenses, the 2024 Proposed GF Budget expenses are 4.1% lower than Projected 2023 and 1.6% higher than Approved 2023 Budget.

4

TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817

EAST GOSHEN TOWNSHIP

Proposed 2024 Budget Detail

Variance Detail Report

GENERAL FUND

REVENUES 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
LOCAL ENABLING TAXES
R.E.PROPERTY TAX 2,056,560 1,999,785 2,831,000 2,872,363 2,850,000 (22,363) -0.8% 19,000 0.7%
PROPERTY TAX - LIEN REVENUE 10,965 30,622 0 26,331 0 (26,331) -100.0% 0
PROPERTY TAX - INTERIM 671 5,872 0 2,077 0 (2,077) -100.0% 0
PROPERTY TAX - DISCOUNT (38,031) (37,203) 0 (53,027) 0 53,027 -100.0% 0
REAL ESTATE TRANSFER TAX 963,967 855,863 800,000 643,824 720,000 76,176 11.8% (80,000) -10.0%
EARNED INCOME TAXES 5,736,165 5,875,677 5,600,000 5,937,653 5,750,000 (187,653) -3.2% 150,000 2.7%
LOCAL SERVICES TAX REVENUE 352,254 351,685 340,000 342,657 350,000 7,343 2.1% 10,000 2.9%
PROPERTY TAX - PENALTY 6,379 5,269 0 4,658 0 (4,658) -100.0% 0
LST TAX - REFUND (73) (97) 0 (235) 0 235 -100.0% 0
EIT REFUNDS (104,189) (80,185) 0 (96,570) 0 96,570 -100.0% 0
PROPERTY TAX FEES 0 (12,252) (12,000) (12,308) (27,000) (14,692) 119.4% (15,000) 125.0%
LOCAL ENABLING TAXES 8,984,667 8,995,035 9,559,000 9,667,424 9,643,000 (24,424) -0.3% 84,000 0.9%
LICENSE & PERMITS
CABLE TELEVIS.FRANCHISE 420,394 407,679 429,099 401,397 395,000 (6,397) -1.6% (34,099) -7.9%
CROWN CASTLE FRANCHISE FEE 4,346 4,295 4,000 4,381 4,400 19 0.4% 400 10.0%
STREET ENCROACH. PERMITS 16,070 13,580 8,000 5,577 4,000 (1,577) -28.3% (4,000) -50.0%
LICENSE & PERMITS 440,810 425,554 441,099 411,355 403,400 (7,955) -1.9% (37,699) -8.5%
FINES
DISTRICT COURT FINES 12,996 10,983 12,500 16,605 15,000 (1,605) -9.7% 2,500 20.0%
VEHICLE CODE VIOLATIONS,STATE FINES 7,107 7,144 8,000 7,477 5,500 (1,977) -26.4% (2,500) -31.3%
EAST GOSHEN TWP FINES 7,418 4,833 8,000 4,365 5,000 635 14.6% (3,000) -37.5%
ZONING - CIVIL VIOLATIONS 1,400 20,024 500 947 0 (947) -100.0% (500) -100.0%
ALARM ORDINANCE FEES 16,200 26,520 21,000 13,800 20,000 6,200 44.9% (1,000) -4.8%
FINES 45,121 69,505 50,000 43,194 45,500 2,306 5.3% (4,500) -9.0%
INTEREST EARNINGS
INTEREST EARNINGS 2,750 102,835 165,759 309,075 275,000 (34,075) -11.0% 109,241 65.9%
INTEREST EARNINGS 2,750 102,835 165,759 309,075 275,000 (34,075) -11.0% 109,241 65.9%
RENTS
RENT OF PROPERTIES - POLICE 11,392 11,392 11,392 12,342 11,392 (950) -7.7% (0) 0.0%
RENT REVENUE - DISTRICT COURT 89,881 91,674 93,506 93,504 95,372 1,868 2.0% 1,866 2.0%
RENTS 101,273 103,066 104,898 105,846 106,764 918 0.9% 1,866 1.8%

5

2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj ($) 24 Prop Bud vs. '23 Proj (%) 24 Prop Bud vs. '23 Bud ($) 24 Prop Bud vs. '23 Bud (%)
STATE SHARED REVENUE & ENTITLEMENT
HHW REBATES 3,928 3,380 3,250 4,456 4,500 44 1.0% 1,250 38.5%
P.U. REALTY TAX 8,108 8,734 8,000 8,057 8,500 443 5.5% 500 6.3%
PA LIQUOR CONTROL BOARD 0 650 0 650 650 0 0.0% 650
PENSION AID - STATE DC 120,253 121,840 125,000 148,345 145,000 (3,345) -2.3% 20,000 16.0%
STATE SHARED REVENUE & ENTITLEMENT 132,289 134,604 136,250 161,508 158,650 (2,858) -1.8% 22,400 16.4%
GENERAL GOVERNMENT
FEES ZON.SUBDIV.LAND DEV. 450 775 0 6,300 0 (6,300) -100.0% 0
FEES FOR ENG. RECHARGES 19,648 30,052 24,000 38,943 30,000 (8,943) -23.0% 6,000 25.0%
ZONING HEARING BOARD - FEES 3,250 550 1,000 2,200 3,000 800 36.4% 2,000 200.0%
SALES & DONATIONS - HISTORICAL COMM 536 (1) 0 254 0 (254) -100.0% 0
BLACKSMITH REVENUE 655 1,256 1,000 884 1,000 116 13.2% 0 0.0%
SALE-MAPS & PUBLICATIONS 19 104 0 0 0 0 0
SPCA RECHARGE FEES COLLECTED 0 351 0 0 0 0 0
PROPERTY TAX - CERT FEES 5,005 430 0 0 0 0 0
GENERAL GOVERNMENT 29,563 33,517 26,000 49,130 34,000 (15,130) -30.8% 8,000 30.8%
PUBLIC SAFETY
BUILDING PERMITS 282,016 403,577 300,000 429,877 375,000 (54,877) -12.8% 75,000 25.0%
REOCCUPANCY PERMIT FEES-APT RENTALS 24,720 31,020 26,500 21,859 30,000 8,141 37.2% 3,500 13.2%
REOCCUPANCY PERMIT FEES-RESALES 22,800 17,650 21,500 24,028 22,000 (2,028) -8.4% 500 2.3%
RENTAL INSPECTION - COMMERCIAL 1,700 500 1,000 200 0 (200) -100.0% (1,000) -100.0%
CONTRACTOR LICENSING PER. 2,425 2,050 1,500 3,777 4,500 723 19.1% 3,000 200.0%
WIRELESS ANNUAL REGISTRATION FEE 200 200 200 175 200 25 14.3% 0 0.0%
STORMWATER MNGT INSPECTION FEE 345 0 1,000 1,100 500 (600) -54.5% (500) -50.0%
UCC TRAINING FEE (DCED) 3,542 3,618 3,500 5,779 3,492 (2,287) -39.6% (8) -0.2%
MISCELLANEOUS CODES REVENUE 0 100 0 200 400 200 100.0% 400
SPRAY IRRIGATION LOAN REV. 0 24,758 0 0 0 0 0
ON-LOT MANAGEMENT FEES 880 1,440 1,000 617 0 (617) -100.0% (1,000) -100.0%
SEWER INSPECTION FEES 60 150 0 40 0 (40) -100.0% 0
PUBLIC SAFETY 338,687 485,063 356,200 487,652 436,092 (51,560) -10.6% 79,892 22.4%
HIGHWAY & STREETS
MISCELLANEOUS - PUBLIC WORKS 5,852 433 1,000 273 500 227 83.3% (500) -50.0%
PENN DOT RECHARGE GRASS CUTTING 0 443 443 0 0 0 (443) -100.0%
MAINTENANCE RECHARGES - CCCBI 600 170 500 1,256 1,500 244 19.4% 1,000 200.0%
HIGHWAY & STREETS 6,452 1,045 1,943 1,529 2,000 471 30.8% 57 2.9%

6

2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
CULTURE & RECREATION
TRIPS 0 2,250 18,060 13,719 18,920 5,201 37.9% 860 4.8%
SUMMER PROGRAM 33,977 66,633 65,000 111,076 115,000 3,924 3.5% 50,000 76.9%
COMMUNITY DAY 17,536 22,390 27,000 1,675 25,000 23,325 1392.5% (2,000) -7.4%
AMPHITHEATER EVENTS 1,200 3,340 2,750 2,413 1,000 (1,413) -58.6% (1,750) -63.6%
PARK FEES 8,675 7,054 7,500 11,896 12,000 104 0.9% 4,500 60.0%
BALL FIELD RENTAL 10,060 12,797 10,000 18,767 10,000 (8,767) -46.7% 0 0.0%
GOLF APPLEBROOK/HMV 23,350 12,280 21,000 23,390 17,500 (5,890) -25.2% (3,500) -16.7%
ART 13,825 3,805 7,500 0 4,000 4,000 (3,500) -46.7%
ROBOTICS PROGRAM 3,410 4,900 5,000 5,155 5,000 (155) -3.0% 0 0.0%
MISCELLANEOUS EVENTS 2,552 4,150 1,500 4,740 5,500 760 16.0% 4,000 266.7%
TENNIS COURT RENT 4,290 2,705 4,000 3,316 1,200 (2,116) -63.8% (2,800) -70.0%
ADULT & YOUTH TENNIS INSTRUCTION 9,830 20,705 15,000 30,683 23,000 (7,683) -25.0% 8,000 53.3%
ZUMBA 2,804 3,978 4,250 1,045 4,200 3,155 301.9% (50) -1.2%
YOGA CLASSES 9,550 12,567 11,802 15,092 16,900 1,808 12.0% 5,098 43.2%
ROCKETRY SUMMER CAMP 1,550 1,840 2,000 1,450 1,500 50 3.4% (500) -25.0%
APIARY EDUCATION PROGRAM 2,500 0 0 0 0 0 0
CULTURE & RECREATION 145,109 182,721 202,362 244,637 261,720 17,083 7.0% 59,358 29.3%
MISCELLANEOUS REVENUE
MISCELLANEOUS 11,236 27,480 7,500 97,028 13,000 (84,028) -86.6% 5,500 73.3%
WKMEN'S COMP.-OUT OF AREA 22,297 24,464 25,000 20,546 20,000 (546) -2.7% (5,000) -20.0%
INSURANCE CLAIMS AND DIVIDENDS 70,193 78,379 35,000 37,615 35,000 (2,615) -7.0% 0 0.0%
WIRELESS REVENUE 48,148 128,668 64,707 64,707 64,707 0 0.0% 0 0.0%
WIRELESS TOWER REIMBURSEMENT 5,916 4,764 5,950 6,102 5,000 (1,102) -18.1% (950) -16.0%
INSURANCE PROCEEDS - PUBLIC WORKS 4,913 27,776 0 0 0 0 0
MISCELLANEOUS REVENUE 162,702 291,531 138,157 225,998 137,707 (88,290) -39.1% (450) -0.3%
INTERFUND OPERATING TRANSFERS
TRFR FR LIQ FUELD - SNOW MATERIALS 63,194 1,674 60,000 60,000 2,000 (58,000) -96.7% (58,000) -96.7%
TRFR FR LIQ FUELS SNOW EQUIP RENTAL 19,878 15,418 20,000 20,000 16,500 (3,500) -17.5% (3,500) -17.5%
TRFR FR LIQ FUELS TRAF SIG M&R 0 0 10,000 10,000 12,000 2,000 20.0% 2,000 20.0%
TRFR FR LIQ FUELS STREET LIGHTING 9,415 0 0 0 0 0 0
TRFR FR LIQ FUELS ROAD MATERIALS 18,845 0 60,000 60,000 0 (60,000) -100.0% (60,000) -100.0%
TRFR FR LIQ FUELS RESURFACING MAT'L 208,561 359,945 240,000 240,000 360,000 120,000 50.0% 120,000 50.0%
TRFR FR LIQ FUELS - EQUIP RENTAL 41,436 33,707 30,000 30,000 35,000 5,000 16.7% 5,000 16.7%
TRFR FR LIQ FUELS - TREE REMOVAL 42,637 39,353 40,000 40,000 40,000 0 0.0% 0 0.0%
TRFR FR LIQ FUELS-STORM WATER EQUIP 30,649 1,208 40,000 40,000 1,500 (38,500) -96.3% (38,500) -96.3%
TRFR FR LF - MINOR EQUIP.VEHICLE 39,453 15,020 10,000 10,000 15,000 5,000 50.0% 5,000 50.0%
TRFR FR LF - VEHICLE MINOR EQUIP 15,632 8,205 5,000 5,000 10,000 5,000 100.0% 5,000 100.0%
TRFR FR LF-STREET/TRAF LIGHT MAINT 6,781 14,148 5,000 12,250 15,000 2,750 22.4% 10,000 200.0%
TRFR FR LF - RESURFACING RENTALS 14,879 32,655 5,000 5,000 35,000 30,000 600.0% 30,000 600.0%
TRANSF. FROM SEWER OPER. 449,911 521,008 460,000 617,992 600,000 (17,992) -2.9% 140,000 30.4%
TRANSFER FROM REFUSE 71,865 85,772 80,000 95,474 100,000 4,526 4.7% 20,000 25.0%
TRANSF. FROM MUNIC. AUTH. 30,920 33,488 32,000 37,484 40,000 2,516 6.7% 8,000 25.0%
INTERFUND OPERATING TRANSFERS 1,064,056 1,162,528 1,097,000 1,283,199 1,726,000 442,801 34.5% 629,000 57.3%
TOTAL REVENUES 11,453,479 11,987,004 12,278,669 12,990,547 13,229,833 239,286 1.8% 951,165 7.7%

7

EXPENSES 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
GENERAL GOVERNMENT
SALARIES - SUPERVISORS/MGMT/FIN/ADMIN 647,315 650,113 680,103 695,092 674,645 (20,447) -2.9% (5,457) -0.8%
MATERIALS & SUPPLIES 17,689 16,210 21,911 18,839 20,000 1,161 6.2% (1,911) -8.7%
STATIONERY 2,929 2,121 3,061 1,578 2,500 922 58.4% (561) -18.3%
MINOR EQUIP. PURCH. &REP. 1,547 1,424 1,836 2,057 2,500 443 21.5% 664 36.2%
GENERAL EXPENSE 36,198 100,001 10,000 16,950 20,000 3,050 18.0% 10,000 100.0%
NEIGHBORHOOD UNIVERSITY 717 0 0 0 0 0 0
SUSTAINABILITY COMMITTEE EXPENSES 415 1,579 3,000 3,000 2,733 (267) -8.9% (267) -8.9%
PSATS EXPENSE 5,393 2,745 5,000 4,263 5,000 737 17.3% 0 0.0%
CCATO EXPENSES 800 770 800 1,200 800 (400) -33.3% 0 0.0%
CONSULTING SERVICES 40,933 51,178 67,250 56,089 55,841 (248) -0.4% (11,409) -17.0%
CONSULTING - PERSONNEL 0 0 25,000 25,565 500 (25,065) -98.0% (24,500) -98.0%
COMMUNICATION EXPENSE 42,607 42,140 50,000 46,534 51,650 5,116 11.0% 1,650 3.3%
POSTAGE 5,681 7,668 7,500 4,652 8,000 3,348 72.0% 500 6.7%
AUTO ALLOWANCE 632 0 1,000 1,000 0 (1,000) -100.0% (1,000) -100.0%
ADVERTISING - PRINTING 11,370 6,198 9,987 9,978 10,000 22 0.2% 13 0.1%
ABC APPRECIATION EVENT 0 0 10,000 5,065 6,000 935 18.5% (4,000) -40.0%
NEWSLETTERS 0 0 12,000 8,373 8,073 (299) -3.6% (3,927) -32.7%
INSURANCE - BONDING 0 1,619 7,905 7,238 7,455 217 3.0% (450) -5.7%
MAINTENANCE & REPAIRS 602 0 550 714 250 (464) -65.0% (300) -54.6%
RENTAL OF EQUIP. -OFFICE 8,311 7,633 10,320 9,013 10,500 1,487 16.5% 180 1.7%
BANK FEES 2,628 3,779 3,450 3,380 3,456 76 2.2% 6 0.2%
CAP REPLACEMENT - OFFICE EQUIP 11,924 22,110 6,719 31,719 12,000 (19,719) -62.2% 5,281 78.6%
AUDITING EXPENSE 41,750 42,500 42,500 42,500 44,625 2,125 5.0% 2,126 5.0%
LEGAL - ADMIN 13,763 35,689 35,000 34,142 35,000 858 2.5% 0 0.0%
ENGINEERING SERVICES 28,389 11,789 24,000 58,800 40,000 (18,800) -32.0% 16,000 66.7%
ENGINEER.& MISC.RECHARGES 19,450 29,223 24,000 49,621 30,000 (19,621) -39.5% 6,000 25.0%
COMPUTER EXPENSE 15,578 12,828 13,450 11,876 15,000 3,124 26.3% 1,550 11.5%
CAP REPLACE - SOFTWARE 0 0 0 43,250 43,250 0 0.0% 43,250
CONTRIB.-MALVERN LIBRARY 22,500 22,500 30,000 30,000 31,900 1,900 6.3% 1,900 6.3%
GENERAL GOVERNMENT 979,121 1,071,816 1,106,340 1,222,487 1,141,680 (80,807) -6.6% 35,339 3.2%
TAX COLLECTION
R.E.TAX COLLECT-COMMISSION/SALARIES 1 0 1 2 0 (2) -100.0% (1) -100.0%
FINANCE DEPT - TAX PROCESSING 11,933 0 0 0 0 0 0
CC TAX COLLECTION COMMITTEE 984 0 1,000 1,000 0 (1,000) -100.0% (1,000) -100.0%
R.E. TAX COLLECT - MISC EXPENSE 3,220 0 0 362 500 138 38.2% 500
EIT COMMISSION 97,895 113,201 112,000 106,688 113,050 6,362 6.0% 1,050 0.9%
EIT - POSTAGE CHARGED BY KEYSTONE 1,341 1,607 1,878 1,584 2,424 840 53.0% 546 29.1%
LST - POSTAGE CHARGED BY KEYSTONE 102 101 150 141 210 69 48.6% 60 40.4%
LOCAL SERVICES TAX COMMISSION 4,163 4,189 5,100 4,005 4,200 195 4.9% (900) -17.6%
TAX COLLECTION 119,639 119,098 120,129 113,782 120,385 6,602 5.8% 256 0.2%

8

2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
GENERAL GOVERNMENT BLDG & PLANT
TWP. BLDG. - MATERIALS & SUPPLIES 394 884 900 34 500 466 1379.3% (400) -44.5%
TWP. BLDG. - MINOR EQUIPEMENT 2,493 1,650 2,500 0 2,500 2,500 0 0.0%
TWP. BLDG. - FUEL, LIGHT, WATER 39,282 43,244 40,000 43,176 47,000 3,824 8.9% 7,000 17.5%
PW BLDG - FUEL,LIGHT,SEWER & WATER 12,865 14,174 15,000 15,731 17,000 1,269 8.1% 2,000 13.3%
TWP. BLDG. - MAINT & REPAIRS 81,058 98,833 100,000 137,694 95,000 (42,694) -31.0% (5,000) -5.0%
PW BUILDING - MAINT REPAIRS 20,718 53,289 30,000 43,937 30,000 (13,938) -31.7% 0 0.0%
DISTRICT COURT EXPENSES 20,810 27,725 33,000 41,740 13,000 (28,740) -68.9% (20,000) -60.6%
WIRELESS TOWER TAX PAYMENTS 5,916 5,996 6,250 6,102 6,194 92 1.5% (57) -0.9%
CAP REPLACEMENT - TWP BLDG 45,525 81,069 46,174 46,174 40,000 (6,174) -13.4% (6,174) -13.4%
CAP PURCHASE - TWP BLDG 146,384 272,686 45,000 45,000 45,000 0 0.0% 0 0.0%
BOOT & PAOLI LED SIGN 542 390 400 0 400 400 0 0.0%
NEW SOFTWARE 2021 75,500 0 0 0 0 0 0
GENERAL GOVERNMENT BLDG & PLANT 451,488 599,940 319,223 379,588 296,593 (82,995) -21.9% (22,630) -7.1%
PUBLIC SAFETY
POLICE ARBITRATION AND LEGAL FEES 0 1,150 0 4,050 0 (4,050) -100.0% 0
POLICE GEN.EXPENSE 3,782,629 3,991,623 4,326,351 4,278,382 5,194,943 916,560 21.4% 868,592 20.1%
REGIONAL POLICE BLDG INTEREST 6,256 13,026 5,524 10,128 0 (10,128) -100.0% (5,524) -100.0%
REGIONAL POLICE BLDG PRINCIPAL 117,183 109,474 119,177 114,574 0 (114,574) -100.0% (119,177) -100.0%
CAPITAL CONTRIBUTION - POLICE BLDG 20,100 20,600 21,100 21,100 21,650 550 2.6% 550 2.6%
S.P.C.A. CONTRACT 8,044 9,492 8,500 11,291 30,600 19,309 171.0% 22,100 260.0%
FIREFIGHTER STIPEND FOR PW 8,500 8,800 9,600 9,645 21,600 11,955 123.9% 12,000 125.0%
FIRE MARSHAL - EXPENSES 0 0 0 6,023 0 (6,023) -100.0% 0
HYDRANT & WATER SERVICE 74,502 80,078 85,099 85,113 90,000 4,887 5.7% 4,901 5.8%
CONTRIB. TO VOL. FIRE CO. 383,059 400,594 499,882 500,489 550,627 50,139 10.0% 50,745 10.2%
VOLUNTEER FIREFIGHTER WORKERS COMP 44,489 47,599 45,713 41,937 46,000 4,063 9.7% 287 0.6%
PUBLIC SAFETY 4,444,762 4,682,436 5,120,946 5,082,731 5,955,420 872,689 17.2% 834,474 16.3%
PLANNING & ZONING
ZONING/CODES/INSPECTORS WAGES & SALARIES 312,551 298,604 323,351 308,453 385,852 77,399 25.1% 62,501 19.3%
CODE BOOKS/OTHER 5,367 8,099 7,500 9,223 8,000 (1,223) -13.3% 500 6.7%
ZONING CONSULTANTS 263 0 1,000 1,000 0 (1,000) -100.0% (1,000) -100.0%
COURT REPORTERS 1,575 1,506 2,163 336 0 (336) -100.0% (2,163) -100.0%
LEGAL - CODES 3,515 13,778 12,382 1,220 6,000 4,780 392.0% (6,382) -51.5%
LEGAL - PLANNING COMMISSION 1,470 1,159 1,644 0 750 750 (894) -54.4%
LEGAL - ZONING HEARING BOARD 14,803 18,929 13,147 13,274 15,500 2,226 16.8% 2,353 17.9%
LEGAL - CONDITIONAL USE 0 0 500 500 0 (500) -100.0% (500) -100.0%
LEGAL - SUBDIVISION & LAND DEVELOP 0 4,659 1,500 3,003 5,000 1,997 66.5% 3,500 233.4%
ZONING IT CONSULTING 336 336 379 343 346 3 0.9% (32) -8.6%
GENERAL EXPENSE 1,576 960 1,500 4,099 2,000 (2,099) -51.2% 500 33.3%
ENGINEERING SERVICES 40,113 20,327 10,000 43,208 2,500 (40,708) -94.2% (7,500) -75.0%
LEGAL - TWP CODE 10,349 1,106 6,000 1,000 1,500 500 50.0% (4,500) -75.0%
UNIFORM CONSTRUCTION CODE FEES 3,528 3,695 3,835 3,887 2,000 (1,887) -48.5% (1,835) -47.8%
RENTAL OF EQUIP. -CODES 0 0 0 2,081 2,392 311 15.0% 2,392
PLANNING & ZONING 395,445 373,157 384,900 391,628 431,840 40,212 10.3% 46,940 12.2%

9

2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
RECYCLING
E-RECYCLING EVENTS 7,000 7,000 8,000 8,000 7,000 (1,000) -12.5% (1,000) -12.5%
COUNTY HAZARDOUS WASTE 6,760 8,912 4,000 4,189 8,378 4,189 100.0% 4,378 109.4%
Roadside Litter Pick-Up 0 0 5,000 4,000 5,000 1,000 25.0% 0 0.0%
RECYCLING 13,760 15,912 17,000 16,189 20,378 4,189 25.9% 3,378 19.9%
PUBLIC WORKS - SANITATION
WAGES - SEWER/STORMWATER/ADMIN/FIN 319,533 266,706 211,983 289,907 326,611 36,704 12.7% 114,629 54.1%
STORMWATER MATERIALS & SUPPLIES 112,232 63,559 100,000 154,581 150,000 (4,581) -3.0% 50,000 50.0%
STORMWATER MGMT.EXPENSE MS4 500 3,000 4,500 2,500 4,500 2,000 80.0% 0 0.0%
STORMWATER ENGINEERING 1,104 497 17,500 0 17,500 17,500 0 0.0%
STORMWATER EQUIPMENT RENTAL 35,840 17,528 20,000 29,021 30,099 1,078 3.7% 10,099 50.5%
PUBLIC WORKS - SANITATION 469,210 351,289 353,982 476,009 528,709 52,701 11.1% 174,727 49.4%
PUBLIC WORKS - HWYS ROADS & STREETS
HWY/ADMIN/FIN - SALARIES & WAGES 634,868 634,732 725,928 737,382 743,875 6,494 0.9% 17,948 2.5%
VEHICLE OPERATION - FUEL 67,359 92,692 67,000 77,735 69,030 (8,706) -11.2% 2,030 3.0%
MAINTENANCE AND REPAIRS - FUEL TANK 480 1,061 500 423 500 77 18.1% 0 0.0%
VEHICLE MAINT AND REPAIR 131,850 131,079 131,000 179,648 150,000 (29,648) -16.5% 19,001 14.5%
MINOR EQUIP. PURCHASE 17,319 35,226 22,000 23,484 20,701 (2,783) -11.9% (1,299) -5.9%
CAP REPLACEMENT - HWY EQUIP 160,834 302,165 147,358 147,358 145,000 (2,358) -1.6% (2,358) -1.6%
CAP PURCHASE - HWY EQUIP 7,438 14,740 28,000 165,998 30,000 (135,998) -81.9% 2,000 7.1%
SNOW - MATERIALS & SUPPLIES 106,412 41,707 90,000 90,470 75,000 (15,470) -17.1% (15,000) -16.7%
SNOW - MAINTENANCE & REPAIRS 24,872 19,816 17,000 7,804 17,000 9,196 117.8% 0 0.0%
SNOW - EQUIPMENT RENTAL 19,878 21,271 25,000 23,308 25,000 1,692 7.3% 0 0.0%
MATERIALS & SUPPLIES - SIGNS 17,882 16,446 12,800 14,914 14,068 (846) -5.7% 1,268 9.9%
UTILITIES - TRAFFIC LIGHTS 6,839 7,188 8,700 7,504 16,700 9,195 122.5% 8,000 92.0%
MAINT. REPAIRS.TRAFF.SIG. 29,357 85,757 48,000 91,870 100,000 8,130 8.8% 52,000 108.3%
STREET LIGHTING 9,415 14,039 16,000 13,044 16,000 2,956 22.7% 0 0.0%
GENERAL EXPENSE - SHOP 12,545 26,312 18,000 25,679 24,195 (1,485) -5.8% 6,194 34.4%
SHOP - TOOLS 7,059 6,736 8,000 4,353 5,000 647 14.9% (3,000) -37.5%
LEGAL - PUBLIC WORKS 0 900 0 650 1,148 498 76.6% 1,148
MATERIALS & SUPPLIES-HIGHWAYS 144,356 57,569 160,000 176,681 125,000 (51,681) -29.3% (35,000) -21.9%
MATER. & SUPPLY-RESURFAC. 218,119 370,317 300,000 268,202 260,000 (8,202) -3.1% (40,000) -13.3%
TREE REMOVAL 135,959 88,992 150,000 98,657 90,000 (8,657) -8.8% (60,000) -40.0%
STREET TREE PLANTINGS 698 0 3,500 0 0 0 (3,500) -100.0%
EQUIPMENT RENTAL 31,553 34,487 50,000 71,805 75,000 3,195 4.4% 25,000 50.0%
EQUIP. RENTAL -RESURFAC. 27,475 42,530 86,000 75,325 78,500 3,175 4.2% (7,500) -8.7%
PUBLIC WORKS - HWYS ROADS & STREETS 1,812,565 2,045,762 2,114,784 2,302,295 2,081,715 (220,581) -9.6% (33,069) -1.6%

10

2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
PARTICIPANT RECREATION
ALL PARK & REC/SUMMER WAGES 116,740 169,550 197,811 227,706 225,874 (1,832) -0.8% 28,063 14.2%
PUBLIC WORKS SUPPORT COMM. DAY 0 7,170 6,180 3,028 4,180 1,152 38.0% (2,000) -32.4%
PUBLIC WORKS SUPPORT PUMPKIN FEST 0 4,343 854 5,382 854 (4,528) -84.1% 0 0.0%
SUMMER PROGRAM SUPPLIES 2,984 7,278 6,878 9,685 8,000 (1,685) -17.4% 1,122 16.3%
SUMMER PROGRAM FIELD TRIPS 6,162 11,092 6,180 16,532 11,770 (4,762) -28.8% 5,590 90.5%
SUMMER PROGRAM - ENTERTAINMENT 0 875 0 725 1,280 555 76.6% 1,280
SUMMER PROGRAM GENERAL EXPENSE 823 4,708 3,128 445 3,128 2,684 603.4% 0 0.0%
GENERAL EXPENSE 4,357 4,670 3,407 5,072 3,407 (1,665) -32.8% 0 0.0%
TRIPS 0 100 17,200 24,249 17,200 (7,049) -29.1% 0 0.0%
PUMPKIN FESTIVAL 3,091 3,485 3,500 3,559 3,500 (59) -1.6% 0 0.0%
EGG HUNT 50 1,376 1,365 1,381 2,000 619 44.8% 635 46.5%
COMMUNITY DAY 16,741 21,010 20,000 127 20,000 19,873 15707.6% 0 0.0%
GOLF DAY - APPLEBROOK 23,600 12,610 20,000 23,060 22,433 (627) -2.7% 2,433 12.2%
ART 12,776 3,773 2,560 3,424 2,560 (864) -25.2% 0 0.0%
ROBOTICS PROGRAM 61 118 152 400 500 100 25.0% 349 230.0%
MISCELLANEOUS EVENTS 1,319 2,497 1,500 3,743 5,000 1,257 33.6% 3,500 233.3%
TEEN SHOWCASE 0 0 0 1,952 1,000 (952) -48.8% 1,000
LADIES & YOUTH TENNIS 8,348 17,706 10,000 26,105 21,628 (4,477) -17.1% 11,628 116.3%
ZUMBA 2,698 3,999 4,074 485 4,074 3,590 740.5% 0 0.0%
YOGA EXPENSE 7,154 9,648 11,240 12,782 14,775 1,994 15.6% 3,535 31.5%
ROCKETRY SUMMER CAMP 942 971 947 938 1,656 718 76.6% 709 74.8%
HOLIDAY TREE CELEBRATION 407 1,121 703 660 784 124 18.8% 81 11.6%
APIARY EDUCATION PROGRAM 1,715 792 500 30 500 470 1562.8% 0 0.0%
PICKLEBALL COURT 0 2,603 0 2,421 3,463 1,042 43.1% 3,463
COMMUNITY MEMORIAL PROGRAM 0 238 0 294 519 225 76.6% 519
CRED.CARD BANK CHARGES 2,988 3,764 3,575 4,761 5,000 239 5.0% 1,425 39.9%
AMPHITHEATER CONCERTS 2,433 631 2,605 2,752 4,859 2,107 76.6% 2,254 86.5%
PARTICIPANT RECREATION 215,389 296,126 324,360 381,697 389,947 8,250 2.2% 65,587 20.2%
2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
PARKS
WAGES - PARK MAINT./ADMIN/FINANCE STAFF 173,565 213,548 257,564 246,868 301,826 54,958 22.3% 44,262 17.2%
MAINTENANCE SUPPLIES 5,102 2,140 4,000 60 4,000 3,940 6601.7% 0 0.0%
TREE REMOVAL-PARK 0 21,417 12,000 45,393 40,000 (5,393) -11.9% 28,000 233.3%
MINOR EQUIPMENT 0 0 5,600 5,600 5,600 0 0.0% 0 0.0%
GENERAL EXPENSE 5,992 16,795 8,000 16,907 18,000 1,093 6.5% 10,000 125.0%
PROFESSIONAL SERVICES 200 300 10,000 4,468 14,147 9,678 216.6% 4,147 41.5%
UTILITIES 5,715 4,977 6,534 7,256 7,500 244 3.4% 966 14.8%
BUTTERFLY GARDEN 234 0 600 600 0 (600) -100.0% (600) -100.0%
LANDSCAPING 6,881 15,195 12,000 3,470 7,000 3,530 101.7% (5,000) -41.7%
POND TREATMENT 5,271 9,090 11,000 6,780 0 (6,780) -100.0% (11,000) -100.0%
POND LANDSCAPING 0 0 2,000 359 250 (109) -30.5% (1,750) -87.5%
TENNIS COURT MAINTENANCE 52 13 300 371 500 129 34.9% 200 66.7%
MARYDELL POND REHAB 20,012 845 750 971 0 (971) -100.0% (750) -100.0%
SOCCER FIELDS 777 0 0 638 750 113 17.6% 750
BALL FIELDS 4,901 5,088 4,000 3,765 5,000 1,235 32.8% 1,000 25.0%
TOT LOT 2,562 0 500 500 0 (500) -100.0% (500) -100.0%
SATELITE PARK IMPROVEMENT (PONDS) 935 930 1,500 8,442 0 (8,442) -100.0% (1,500) -100.0%
PARK MAINTENANCE & REPAIR 29,057 52,786 45,000 36,920 45,000 8,080 21.9% 0 0.0%
CAPITAL REPLACEMENT - PARK & REC 24,158 44,219 18,977 20,000 44,700 24,700 123.5% 25,723 135.6%
CAPITAL PURCHASE - PARK & REC 0 0 288,272 81,000 0 (81,000) -100.0% (288,272) -100.0%
PARK WAGES THAT GENERATE REVENUE 18,733 23,186 19,490 21,952 22,211 260 1.2% 2,721 14.0%
PARKS 304,147 410,528 708,086 517,499 521,483 3,984 0.8% (186,603) -26.4%
CONSERVATION & DEVELOPMENT
WAGES - CONSERVANCY 471 471 0 536 0 (536) -100.0% 0
PROFESSIONAL SERVICES 0 450 1,000 0 500 500 (500) -50.0%
LANDSCAPING 0 1,320 3,000 3,550 2,689 (861) -24.3% (311) -10.4%
CONSERVATION & DEVELOPMENT 471 2,241 4,000 4,086 3,189 (897) -21.9% (811) -20.3%
HISTORICAL
WAGES - HISTORICAL 300 0 0 0 0 0 0
BLACKSMITH SUPPLIES 514 2,328 1,000 625 500 (125) -19.9% (500) -50.0%
GENERAL EXPENSE 0 0 0 180 0 (180) -100.0% 0
MEMBERSHIPS/SUBS 100 0 0 0 0 0 0
PROFESSIONAL SERVICES 0 0 2,300 2,720 411 (2,309) -84.9% (1,889) -82.1%
HISTORICAL 914 2,328 3,300 3,524 911 (2,613) -74.1% (2,389) -72.4%
2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
DEBT SERVICE
SPRAY IRRIG-BOND PRINCIPAL 24,000 0 0 0 0 0 0
PUB.WKS BLDG - PRINCIPAL 162,609 168,968 175,782 175,782 0 (175,782) -100.0% (175,782) -100.0%
REFURBISH T/B-PRINCIPAL 32,522 33,794 35,156 35,156 0 (35,156) -100.0% (35,156) -100.0%
WILLISTOWN CONSERVATION TRUST 19,513 20,276 21,094 21,094 0 (21,094) -100.0% (21,094) -100.0%
PAOLI PIKE & 352 INTERSECTION 92,752 96,379 100,266 100,266 0 (100,266) -100.0% (100,266) -100.0%
WESTTOWN ROAD BRIDGE - PRINCIPAL 28,359 29,468 30,655 30,655 0 (30,655) -100.0% (30,655) -100.0%
PARK BRIDGE OVER RIDLEY CREEK 8,131 8,448 8,789 8,789 0 (8,789) -100.0% (8,789) -100.0%
PARK WARNING LGHT @ APPLEBROOK 2,732 2,838 2,953 2,953 0 (2,953) -100.0% (2,953) -100.0%
WESTTOWN WAY LOT - PRINCIPAL 3,252 3,379 3,516 3,516 0 (3,516) -100.0% (3,516) -100.0%
PAOLI PK & LINE RD.-TURN LANES 8,131 8,449 8,789 8,789 0 (8,789) -100.0% (8,789) -100.0%
SERIES 2017 BOND PRINCIPAL 5,000 5,000 5,000 5,000 320,000 315,000 6300.0% 315,000 6300.0%
SPRAY IRRIG.-BOND INTEREST 333 0 0 0 0 0 0
PUBLIC WORKS BLDG - INTEREST 21,283 14,252 6,945 6,593 0 (6,593) -100.0% (6,945) -100.0%
REFURBISH T/B -INTEREST 4,257 2,850 1,389 1,445 0 (1,445) -100.0% (1,389) -100.0%
WILLISTOWN CONSERVATION TRUST 2,554 1,710 833 867 0 (867) -100.0% (833) -100.0%
PAOLI PIKE & 352 INTERSECTION 12,140 8,129 3,961 4,121 0 (4,121) -100.0% (3,961) -100.0%
WESTTOWN ROAD BRIDGE 3,712 2,486 1,211 1,260 0 (1,260) -100.0% (1,211) -100.0%
PARK BRIDGE OVER RIDLEY CREEK 1,064 713 347 361 0 (361) -100.0% (347) -100.0%
PARK WARNING LGHT @ APPLEBROOK 358 239 117 121 0 (121) -100.0% (117) -100.0%
PURCHASE LOT WESTTOWN WAY 426 285 139 145 0 (145) -100.0% (139) -100.0%
PAOLI PK/LINE-LEFT TURN LANES 1,064 713 347 361 0 (361) -100.0% (347) -100.0%
SERIES 2017 BOND INTEREST 141,900 141,700 141,500 141,500 141,400 (100) -0.1% (100) -0.1%
DEBT SERVICE 576,090 550,077 548,789 549,405 461,400 (88,005) -16.0% (87,389) -15.9%
PENSION FUND CONTRIBUTION
PENSION - DC NON-UNIFORM 136,373 132,827 141,100 148,345 158,700 10,355 7.0% 17,600 12.5%
PENSION FUND CONTRIBUTION 136,373 132,827 141,100 148,345 158,700 10,355 7.0% 17,600 12.5%
INSURANCE PREMIUMS
HEALTH/LIFE/DISABILITY INS - OFFICE 122,399 150,739 208,920 199,579 220,761 21,182 10.6% 11,841 5.7%
HEALTH/LIFE/DISABILITY INS - CODES 21,977 12,886 21,317 19,222 34,114 14,892 77.5% 12,797 60.0%
HEALTH/LIFE/DISABILITY INS - PERMIT 48,931 41,884 55,717 68,623 83,514 14,891 21.7% 27,797 49.9%
HEALTH/LIFE/DISAB INS - PUBLIC WORK (23) 97 0 0 0 (0) -100.0% 0
HEALTH/LIFE/DISAB - PW SANITATION 37,659 30,828 28,378 39,773 35,230 (4,543) -11.4% 6,852 24.1%
HEALTH/LIFE/DISAB - PW PARKS 28,339 43,570 40,202 44,488 45,296 808 1.8% 5,094 12.7%
HEALTH/LIFE/DISAB - PW SNOW 6,198 11,433 18,919 4,335 12,582 8,247 190.3% (6,337) -33.5%
HEALTH/LIFE/DISAB INS - PW ROADS 70,838 86,787 130,066 101,665 125,822 24,157 23.8% (4,244) -3.3%
BENEFITS - PARK REVENUE GENERATED 3,149 4,841 4,730 4,976 5,033 57 1.2% 303 6.4%
HEALTH/LIFE/DISAB INSUR - PARK/REC 24,813 31,676 40,934 41,282 43,187 1,905 4.6% 2,253 5.5%
HEALTH,ACCID. & LIFE 0 156 0 (25) 0 25 -100.0% 0
INSURANCE COVERAGE -PREM. 308,207 145,085 187,588 257,236 197,500 (59,736) -23.2% 9,912 5.3%
HEALTH/LIFE/DISAB - PW STORMWATER 28,906 13,852 14,189 31,827 27,681 (4,147) -13.0% 13,492 95.1%
INSURANCE PREMIUMS 701,393 573,834 750,959 812,981 830,720 17,739 2.2% 79,761 10.6%

13

2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 Proposed Budget 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Proj 24 Prop Bud vs. '23 Bud 24 Prop Bud vs. '23 Bud
EMPLOYEE BENEFITS
MISC. EMPLOYEE BENEFITS 1,632 901 1,222 161 500 339 209.9% (722) -59.1%
DRUG & ALCOHOL TESTING 1,028 960 645 994 1,000 6 0.6% 356 55.2%
ER PAYROLL TAXES - OFFICE 55,908 61,462 67,082 80,287 68,763 (11,524) -14.4% 1,681 2.5%
ER PAYROLL TAXES - FIRE FIRE STIPEN 0 0 0 0 1,728 1,728 1,728
ER PAYROLL TAXES - CODES 7,682 6,444 7,101 7,490 11,967 4,477 59.8% 4,866 68.5%
ER PAYROLL TAXES - PERMITS 17,133 15,934 18,496 15,625 18,411 2,786 17.8% (85) -0.5%
ER PAYROLL TAXES - PW 0 1,592 0 0 0 0 0
ER TAXES - PW SEWER 17,150 12,026 9,230 12,965 12,285 (679) -5.2% 3,056 33.1%
ER TAXES - PW PARKS 12,560 17,357 19,188 15,809 23,438 7,629 48.3% 4,250 22.1%
ER TAXES - PW SNOW 3,864 5,030 6,153 1,196 4,388 3,191 266.7% (1,766) -28.7%
ER TAXES - PW ROADS 31,923 34,469 42,303 38,382 43,877 5,495 14.3% 1,574 3.7%
ER TAX PARK MAINT GENERATE REVENUE 1,396 1,929 1,538 1,701 1,755 54 3.2% 217 14.1%
ER PAYROLL TAXES - PARK/REC 9,502 13,863 16,423 19,283 18,999 (284) -1.5% 2,577 15.7%
UNIFORMS 39,758 43,946 47,225 50,242 60,000 9,758 19.4% 12,775 27.1%
ER TAXES - PW STORMWATER 12,923 4,422 4,615 0 9,653 9,653 5,038 109.2%
TRAINING & SEMINARS-EMPLY 1,374 3,631 19,550 18,924 10,000 (8,924) -47.2% (9,550) -48.8%
EMPLOYEE BENEFITS 213,833 223,966 260,770 263,059 286,764 23,705 9.0% 25,994 10.0%
INTERFUND TRANSFERS
TRANSF. TO CAPITAL RESERVE 61,647 250,322 0 0 0 0 0
TRFR. TO INFRA STRUCTURE FUND 339,058 200,258 0 0 0 0 0
TRANSFER TO OPERATING RESERVE 154,117 0 0 0 0 0 0
INTERFUND TRANSFERS 554,822 450,580 0 0 0 0 0
TOTAL EXPENSES 11,389,421 11,901,916 12,278,669 12,665,307 13,229,833 564,527 4.5% 951,165 7.7%
RESULTS FROM OPERATIONS 64,058 85,088 0 325,240 0

East Goshen Township

2024-2028 Capital Improvement Program

TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817

Environmentally Sound | Socially Equitable | Fiscally Responsible | EAST GOSHEN TOWNSHIP

Respecting the Past Serving the Present Preparing for the Future

NOVEMBER 14, 2023

15

2024-2028 Capital Improvement Program
Summary

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Expenses

Category 2024 2025 2026 2027 2028
Administration (Office, Buildings, Structures) $ 57,000 $ 128,000 $ 36,000 $ 30,000 $ 30,000
Public Works $ 1,010,000 $ 393,000 $ 585,000 $ 200,000 $ 200,000
Park $ 52,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Milltown Dam $ 1,009,138 $ 150,000 $ - $ - $ -
Paoli Pike Trail - Continue w/ Alternate Route B $ 400,000 $ - $ - $ - $ -
Hershey Mill Pond $ - $ - $ 250,000 $ - $ -
Bow Tree Pond I $ 91,850 $ - $ - $ - $ -
WG Sanitary Treatment Plant $ 124,613 $ 174,078 $ 35,000 $ 35,000 $ 35,000
Ridley Creek STP, Pump Stations, & Infrastructure $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
Total $3,637,065 $1,508,078 $1,138,000 $499,000 $477,000
Funding Source 2024 2025 2026 2027 2028
Capital Reserve Fund $ 1,519,000 $ 521,000 $ 621,000 $ 230,000 $ 280,000
Sewer Capital Reserve Fund $ 1,017,077 $ 787,078 $ 217,000 $ 219,000 $ 197,000
Grants $ 91,850 $ - $ - $ - $ -
Series 2017 Bonds $ 1,009,138 $ 150,000 $ - $ - $ -
Infrastructure Sustainability Fund $ - $ - $ 250,000 $ - $ -
Total $3,637,065 $1,458,078 $1,088,000 $449,000 $477,000

*** Large public projects currently underway are Bow Tree Pond dredging, Milltown Dam Rehabilitation, continuation of the Paoli Pike Trail, and the Chester Creek Interceptor cleaning and maintenance. The remaining items are plans for vehicle purchase and replacement, building maintenance, park improvements, and sewer treatment facility and storm water maintenance.

2024-2028 Capital Improvement Program
Administration/Office Capital Expenses

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Category 2024 2025 2026 2027 2028
Computer Replacement $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000
Large Format Scanner/Printer $ 12,000
Radio Booster $ 45,000
Ceiling Heat/AC Units (3 units) $ 12,000
Large Overhead Garage Doors $ 16,000 $ 18,000 $ 18,000
Township Building Windows $ 100,000
Total $ 57,000 $ 128,000 $ 36,000 $ 30,000 $ 30,000
Category 2024 2025 2026 2027 2028
Capital Reserve Fund $ 57,000 $ 128,000 $ 36,000 $ 30,000 $ 30,000
Sewer Capital Reserve Fund
Grants
Series 2017 Bonds
Infrastructure Sustainability Fund
Total $ 57,000 $ 128,000 $ 36,000 $ 30,000 $ 30,000

Notes:

  • 4 PC replacements in 2024; possible server, software updates & licensing.
  • 4 IPAD replacements in 2024 for Codes Department Inspectors and Director.
  • Radio booster needed to comply with Township ordinance amendment, promoting public safety in event of serious emergency...if it testing indicates it is necessary.

2024-2028 Capital Improvement Program
Public Works Expenses

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Category 2024 2025 2026 2027 2028
Dump Truck $ 256,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000
Gator ATV $ 18,000
F350 Pickup w/ Plow $ 70,000 $ 70,000
Vacuum Truck $ 562,000
2 Exmark Mowers $ 35,000 $ 35,000 $ 35,000
2 Utility Trailers $ 14,000
Drone $ 3,000
Chipper $ 100,000
Tractor/Mower $ 70,000 $ 70,000
Paver $ 250,000
Total $ 1,010,000 $ 393,000 $ 585,000 $ 200,000 $ 200,000
Category 2024 2025 2026 2027 2028
Capital Reserve Fund $ 1,010,000 $ 393,000 $ 585,000 $ 200,000 $ 200,000
Sewer Capital Reserve Fund
Grants
Series 2017 Bonds
Infrastructure Sustainability Fund
Total $ 1,010,000 $ 393,000 $ 585,000 $ 200,000 $ 200,000
  • Continued replacement of equipment and trucks per Fixed Asset and Capital Depreciation schedule.
  • Estimate new paver needed by 2026. Current machine from 2016.
  • VAC truck requested by PW Director for 2024/2025 delivery. This equipment has been used via rental and is utilized for sewer and storm water repairs and maintenance which greatly increases efficiency and reduces manpower needed.

2024-2028 Capital Improvement Program
Park Expenses

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Category 2024 2025 2026 2027 2028
Area Around Playground $ 3,000
Veteran's Pavilion Area $ 24,000
Misc. Mid-Term Improvements $ 25,000
Re-Surface EGT Playground Area $ 50,000 $ 50,000 $ 50,000 $ 50,000
Total $ 52,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Category 2024 2025 2026 2027 2028
Capital Reserve Fund $ 52,000 $ - $ - $ - $ 50,000
Sewer Capital Reserve Fund
Grants
Series 2017 Bonds
Infrastructure Sustainability Fund
Total $ 52,000 $ - $ - $ - $ 50,000
  • Area around playground projects include T-ball & volleyball area renovation and Wiffle Ball field.
  • Veteran's Pavilion improvements include fixed chess tables, grill upgrades and stones course.
  • Misc. mid-term improvements include tennis and baseball field bleachers.
  • Projected increase in funding in anticipation of EGT Playground re-surfacing by 2030.

2024-2028 Capital Improvement Program
Hershey's Mill Estates Sewer, Milltown Dam, PPT, & WG STP

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Category 2024 2025 2026 2027 2028
Milltown Dam $ 1,009,138 $ 150,000
Bow Tree Pond I $ 91,850
Paoli Pike Trail - Continue w/ Alternate Route B $ 400,000
Hershey Mill Pond $ 250,000
West Goshen Sanitary Treatment Plant Improvements (Including Westtown Way Pump Station) $ 124,613 $ 174,078 $ 35,000 $ 35,000 $ 35,000
Total $ 1,625,601 $ 324,078 $ 285,000 $ 35,000 $ 35,000
Category 2024 2025 2026 2027 2028
Capital Reserve Fund $ 400,000
Sewer Capital Reserve Fund $ 124,613 $ 174,078 $ 35,000 $ 35,000 $ 35,000
Grants $ 91,850
Series 2017 Bonds $ 1,009,138 $ 150,000 $ - $ - $ -
Infrastructure Sustainability Fund $ - $ - $ 250,000 $ - $ -
Total $ 1,625,601 $ 324,078 $ 285,000 $ 35,000 $ 35,000
  • Assumes that 1/3 of immediate/required Milltown Mill Dam work occurs in 2023, 2/3 in 2024 with the remaining improvements to be determined. Remaining grant money spread to future year in anticipation of plantings, stream restoration, trails, possible parking area and other upgrades. No grant money is currently included in the forecast but would be sought by staff.
  • Continuation of Paoli Pike Trail.
  • Hershey's Mill Estates Sewer Rehabilitation completed in 2023.
  • Bow Tree Pond dredging project started in 2023, to be completed in 2024. LSA grant awarded for $176K.
  • Projected Hershey Mill Pond restoration is 2026.
  • Ongoing commitment to WGSTP capital projects and final billing closeout for improvements completed.

2024-2028 Capital Improvement Program
EGT Sewer Capital Maintenance
(RC STP & Pump Stations)

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Category 2024 2025 2026 2027 2028
Hunt Country/HM Lift Station Pump Replacement $ 20,000 $ 20,000
Hunt Country P/S Mag Meter $ 15,000
Hunt Country P/S Muffin Monster $ 67,000
Hunt Country P/S Bypass Pump $ 2,000
Relining AC sewer lines and brick manholes $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ 130,000
Ridley Creek STP rebuild 2 SBR pumps $ 16,000
Ridley Creek STP rebuild 2 Sludge pumps $ 7,500
Ridley Creek STP replace generator $ 225,000
Ridley Creek STP Filter Feed Pump** $ 30,000 $ 20,000 $ 20,000 $ 20,000
Ridley Creek STP Blower Replacement $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000
Chester Creek Coll manhole lining (?) for 5 manholes $ 50,000
Chester Creek Coll HM Pumpstation upgrade $ 85,000
Chester Creek Interceptor Phase 2/Supplee Valley Re-lining $ 366,964 $ 315,000
Chester Creek Coll Muffin Monster swap out $ 22,000 $ 22,000
Total $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
Category 2024 2025 2026 2027 2028
Capital Reserve Fund
Sewer Capital Reserve Fund $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
Grants
Series 2017 Bonds
Infrastructure Sustainability Fund
Total $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
  • Ongoing maintenance and pump station upgrades per RCSTP Asset Depreciation inventory and staff recommendation.
  • Replacement generator needed in 2024.
  • Proactive Chester Creek Interceptor inspection & cleaning; Phase 1 in 2023, Phase 2 in 2024; Supplee Valley re-lining. Staff will seek grant funds to offset sewer capital fund contribution.

2024-2028 Capital Improvement Program
Sewer Capital Maintenance
(RC STP & Pump Stations)

[Banner: Diagram with three overlapping circles labeled "Environmentally Sound", "Socially Equitable", "Fiscally Responsible" with "EAST GOSHEN TOWNSHIP" at the center, accompanied by the slogan: "Respecting the Past, Serving the Present, Preparing for the Future"]

Justification for New Assets

  • Relining brick manholes and asbestos cement sewer lines was identified seven years ago as a long-term maintenance priority for pre-mid-1970s sewer assets, which are at the end of their useful life. Costs have increased; consider additional capital contribution annually. Supplee Valley would be next on the list for replacement.
  • Current generator has major issues and needs to be replaced in 2024 to avoid constant power issues affecting various aspects of RCSTP.
  • Hunt Country Pump Station upgrades recommended in 2025; has been postponed multiple years as other projects have taken priority.
  • Hershey Mill Pump Station upgrades per asset depreciation schedule and recommendation for additional capacity.
  • Proactive Inspection and Cleaning of Chester Creek Interceptor to address potential issues.

East Goshen Township

2024 Proposed Pass Through & All Other Funds Budget

November 14, 2023

TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817

23

PROPOSED OTHER FUND CHANGES

(from Preliminary to Proposed)

  • Minor changes to revenue & expense in State Liquid Fuels Fund to parallel General Fund revenue.
  • Capital Reserve Fund updated per changes in the 5-year Capital Plan. $400K expense added to Capital Reserve Fund for continuation of the Paoli Pike Trail as discussed at the 10/17 BoS meeting.; $565K shifted from 2025 to 2024 Budget for GAPVAX truck discussed and P.O. authorization given by BoS at prior meeting. The chassis and body will come in at different times between 2023 and 2025. The P.O. saves us $25K on the purchase price.; The chassis and body will come in at different times between 2023 and 2025. The P.O. saves us $25K on the purchase price.
  • Sewer Operating Fund revenue and expenses updated based on October YTD 2023 and discussions with West Goshen Sewer Authority about 2024 O&M as well as Capital Costs per the West Goshen/East Goshen agreement.
  • Refuse Fund revenue and expenses updated based on October YTD 2023.
  • Municipal Authority and Sewer Capital Reserve Budget updated per changes in the 5-year Capital Plan.
  • ARPA Fund updated based on reduction in Hershey Mill Estates Sewer Rehabilitation actual cost versus budget. Propose utilizing remaining funds for additional 2024 sewer projects.

EAST GOSHEN TOWNSHIP PASS THRU FUNDS PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Adopted Budget 2023 Year-End Projection 2024 PROPOSED Budget
GENERAL FUND
PASS THROUGH ACCOUNTS
FIRE
EXPENSES
FIREFIGHTERS - WAGE EXPENSE 01411 1300 1,381,838 1,381,838 1,509,631 1,731,958 1,788,247
FIREFIGHTERS - HEALTH INS EXPENSE 01411 2000 262,577 262,577 312,151 312,151 327,758
FIRE CO. PAYROLL PROCESS - EXPENSE 01411 2300 5,768 5,768 6,250 6,250 6,875
FIRE CO. WORKERS COMP INS - EXPENSE 01411 2500 81,647 81,647 98,360 98,360 98,360
FIRE CO. PAYROLL TAX - EXPENSE 01487 1660 116,266 116,266 123,709 123,709 127,730
VALIC - ER 01487 1661 8,670 8,670 9,630 9,630 9,943
INR 457 - ER 01487 1665 21,267 21,267 22,223 22,223 22,946
REVENUE
FF SHARE OF INSURANCE DIVIDENDS 01380 0121 42,842 42,842 - - -
PAID FIRE CO. REIMB. - REVENUE 01380 0130 1,835,191 1,835,191 2,081,954 2,304,281 2,381,858
SUBTOTAL - - (0) (0) -
HYDRANTS
HYDRANTS - RECHARGE EXPENSE 01411 3631 28,860 28,860 35,000 35,000 36,050
HYDRANTS - RECHARGE REVENUE 01383 1200 28,860 28,860 35,000 35,000 36,050
SUBTOTAL - - - - -
VOLUNTEER FF RELIEF ASSOCIATION
VOL.FIRE RELIEF ASSOC.- EXPENSE 01411 5250 121,682 121,682 123,000 152,332 156,902
VOL.FIRE RELIEF ASSOC.- REVENUE 01355 1000 121,682 121,682 123,000 152,332 156,902
SUBTOTAL 0 0 - - -
PENSION FIREFIGHTERS
FF PENSION - EXPENSE 01483 5320 124,083 124,083 132,074 132,074 136,366
FF PENSION - REVENUE (STATE AID) 01355 0515 124,083 124,083 132,074 132,074 136,366
SUBTOTAL - - - - -

EAST GOSHEN TOWNSHIP PASS THRU FUNDS PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Adopted Budget 2023 Year-End Projection 2024 PROPOSED Budget
FIREFIGHTERS FUEL CHARGES
FIRE COMPANY FUEL - EXPENSE 01411 1320 25,916 25,916 32,500 32,500 33,556
FIRE COMPANY FUEL - REVENUE 01380 0129 25,916 25,916 32,500 32,500 33,556
SUBTOTAL - - - - -
POLICE PENSION OFFICE STAFF
EXPENSES
POLICE PENSION OFFICE - EXPENSE 01483 5330 - - - - -
WEGO POLICE PENSION PLAN EXPENSE 01410 5250
REVENUES
POLICE PENSION OFFICE - REVENUE 01380 0140
POLICE PENSION OFFICE - STATE AID 01355 0520 - - - - -
WEGO POLICE PENSION PLAN REVENUE 01355 0525
SUBTOTAL - - - - -
TOTAL REVENUES 2,178,574 2,178,574 2,404,528 2,656,187 2,744,733
TOTAL EXPENSES 2,178,574 2,178,574 2,404,528 2,656,187 2,744,733
NET RESULTS 0 0 (0) (0) (0)

EAST GOSHEN TOWNSHIP OTHER FUNDS PROPOSED 2024 BUDGET

STATE LIQUID FUELS FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 41 130 564 564 564
REVENUE
STATE INTEREST EARNINGS 02341 1000 454 6,511 7,750 11,820 12,000 180 1.5% 4,250
STATE LIQUID FUELS 02355 0300 510,994 515,255 517,250 517,250 530,000 12,750 2.5% 12,750
TOTAL REVENUE 511,448 521,766 525,000 529,070 542,000 12,930 2.4% 17,000
EXPENSES
MINOR EQUIPMENT - VEHICLE 02430 2600 15,632 8,205 5,000 5,000 15,000 10,000 10,000
SNOW - MATERIALS & SUPPLIES 02432 2450 63,194 1,674 60,000 60,000 10,000 (50,000) -83.3% (50,000)
SNOW-EQUIPMENT RENTAL 02432 3840 19,878 15,418 20,000 20,000 16,500 (3,500) -17.5% (3,500)
MATERIALS & SUPPLIES 02433 2450 - - - - - - -
MAINT. & REPAIRS-TRAF.SIG 02433 3720 6,781 14,148 15,000 19,070 14,000 (5,070) -26.6% (1,000)
STREET LIGHTING 02434 3720 9,415 - - - - - -
STORM WATER MATERIALS & SUPPLIES 02436 2450 30,649 1,208 40,000 40,000 1,500 (38,500) -96.3% (38,500)
STORM WATER - EQUIPMENT RENTAL 02436 3840 39,453 15,020 10,000 10,000 15,000 5,000 5,000
MATERIALS & SUPPLIES 02438 2450 18,845 - 60,000 60,000 - - 0.0% (60,000)
HIGHWAYS--RESURFACING 02438 2455 208,561 359,945 240,000 240,000 360,000 120,000 50.0% 120,000
TREE REMOVAL 02438 2460 42,637 39,353 40,000 40,000 40,000 - 0.0% -
EQUIPMENT RENTAL 02438 3840 41,436 33,707 30,000 30,000 35,000 5,000 16.7% 5,000
RESURFACING EQUIP.RENTALS 02438 3845 14,879 32,655 5,000 5,000 35,000 30,000 600.0% 30,000
TOTAL EXPENSES 511,359 521,332 525,000 529,070 542,000 12,930 2.4% 17,000
NET RESULT FROM OPERATIONS 89 434 - - - (0) -
ESTIMATED ENDING FUND BALANCE 130 564 564 564 564

CAPITAL RESERVE FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 5,019,917 4,873,286 5,232,573 5,232,573 5,505,325
REVENUE
INTEREST - CAPITAL RESERVE FUND 03341 1000 1,852 65,861 60,000 217,991 200,000 (17,991) -8.3% 140,000
PROCEEDS FROM SALE OF MACH & EQUIP 03341 2000 77,100 - - 53,200 - (53,200) -100.0% -
DCNR PLAYGROUND GRANT 03354 0700 - - - - - - -
DVRPC BRIDGE GRANT 03354 2000 - - - - - - -
Segment C-E TAP/CMAQ Grant 03354 3100 790,113 59,776 - - - - -
DCNR C2P2 03354 4000 88,509 - - - - - -
CFA DAM GRANT 03354 4002 - - - - - - -
C2P2 DAM GRANT-MILLTOWN 03354 4003 - - - - - - -
C2P2 DAM GRANT LWCF-HERSHEY'S MILL 03354 4004 - - 380,000 380,000 - (380,000) -100.0% (380,000)
GTPR DAM GRANT 03354 4005 - 250,000 - - - - -
LANDMARK PENALTY DAM GRANT 03354 4006 - - - - - - -
MISC. CAPITAL REVENUE 03380 1000 - - - - - - -
PLAYGROUND DONATIONS 03387 6000 - - - - - - -
INSURANCE CLAIMS 03391 2000 - - - - - - -
CAP.REPLAC.-TRANSF.-OFFICE 03392 0800 13,779 29,619 6,719 6,719 12,000 5,281 78.6% 5,281
CAP.PURCHASE TRANSF.-TWP.BLDG. 03392 0801 52,608 108,604 45,000 46,174 40,000 (6,174) -13.4% (5,000)
CAP.REPLACEMENT TRANSF.-TWP.BLDG. 03392 0802 169,157 365,305 46,174 45,000 45,000 - 0.0% (1,174)
CAP. REPLACEMENT TRANSF.-HIGHWAY 03392 0804 185,855 404,797 147,358 147,358 145,000 (2,358) -1.6% (2,358)
CAP.PURCHASE-TRANSF.-HIGHWAY 03392 0805 8,596 19,746 28,000 28,000 30,000 2,000 7.1% 2,000
CAP.REPLACEMENT -TRANSF.-PARK 03392 0806 27,916 59,239 18,977 20,000 44,700 24,700 123.5% 25,723
CAP.PURCHASE - TRANSF. - PARK 03392 0807 - - 300,647 81,000 - - (300,647)
CAP REPLACEMENT TRANSFER-SOFTWARE 03392 0808 75,500 - - 43,250 43,250 - 43,250
CAP PURCHASE TRANSFER-SOFTWARE 03392 0809 - - - - - - -
TRANSFER FROM BOND FUND 03392 0850 - - - - - - -
TOTAL REVENUE 1,490,984 1,362,948 1,032,874 1,068,692 559,950 (508,742) -47.6% (472,924)
Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
EXPENSES
CAPITAL REPLACEMENT - OFFICE EQUIP 03401 7400 13,642 - 12,000 12,000 12,000 - 0.0% -
CAPITAL PURCHASE - OFFICE EQUIP 03401 7450 - - - 4,147 - (4,147) -100.0% -
CAPITAL REPLACEMENT-SOFTWARE 03407 7400 75,500 75,500 - 43,250 - - -
CAPITAL REPLACEMENT-TWP BLDG 03409 7400 11,334 11,934 6,719 33,750 - (33,750) -100.0% (6,719)
CAPITAL PURCHASE - TWP BLDG 03409 7450 - 13,480 45,000 - 45,000 45,000 -
POLICE BUILDING ROOF 03410 7400 - - - - - - -
CAPITAL REPLACEMENT - HWY EQUIP 03430 7400 232,703 161,242 833,000 503,191 445,000 (58,191) -11.6% (388,000)
CAPITAL PURCHASE - HWY EQUIP 03430 7450 - - - 35,000 565,000 530,000 1514.3% 565,000
CAPITAL REPLACEMENT - PARK & REC 03454 7400 - 3,675 - - - - -
CAPITAL PURCHASE - PARK & REC 03454 7450 - 7,178 216,000 108,000 52,000 (56,000) -51.9% (164,000)
CAPITAL - HERSHEY MILL REPAIR 03457 7450 394,361 668,705 - 55,222 - (55,222) -100.0% -
CAPITAL - MILLTOWN DAM NEW 03458 7400 41,600 - 1,347,283 - - - (1,347,283)
CAPITAL REPLACEMENT - MILLTOWN DAM 03458 7450 - - - - - - -
PAOLI PK.TRAIL - SEGMT.A 03460 7401 520,569 23,227 - - - - -
PAOLI PK.TRAIL - SEGMT.B 03460 7402 - - - - 400,000 400,000 400,000
PAOLI PK.TRAIL - SEGMT.C 03460 7403 312,739 35,678 - - - - -
PAOLI PK.TRAIL - SEGMT.D 03460 7404 14,507 774 - - - - -
PAOLI PK.TRAIL - SEGMT.E 03460 7405 14,507 774 - - - - -
PAOLI PK.TRAIL - SEGMT.F 03460 7406 - - - - - - -
PAOLI PK.TRAIL - SEGMT.G 03460 7407 - - - - - - -
MISC. CAPITAL REPLACEMENT 03480 7400 5,052 - - - - - -
BANK FEES 03491 5001 1,104 1,495 1,380 1,380 1,380 - -
TRANSFER TO SEWER CAP RESERVE FUND 03492 0900 - - - - - - -
TOTAL EXPENSES 1,637,616 1,003,660 2,461,382 795,939 1,520,380 724,441 91.0% (941,002)
NET RESULT FROM OPERATIONS (146,631) 359,287 (1,428,508) 272,753 (960,430) (1,233,183) 468,078
ESTIMATED ENDING FUND BALANCE 4,873,286 5,232,573 3,804,065 5,505,325 4,544,895

TRANSPORTATION FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 609,337 610,353 468,926 468,926 491,905
  Impact Fees 344,200 344,520 349,804 349,804 364,430
  Non Impact Fees 265,137 265,833 119,121 119,121 127,475
REVENUE
INTEREST EARNINGS 04341 1000 330 1,802 500 8,354 7,500 (854) -10.2% 7,000
INTEREST - IMPACT FEE 04341 1010 319 5,285 250 14,626 12,000 (2,626) -18.0% 11,750
IMPACT FEES 04387 1010 396 396 1,000 - - - (1,000)
TOTAL REVENUE 1,046 7,483 1,750 22,979 19,500 (3,479) -15.1% 17,750
EXPENSES
TRAFFIC STUDY 04439 6040 - - - - - - -
PAOLI PIKE @ APPLEBROOK PARK 04439 6070 - - - - - - -
ROUTE 3 ADAPTIVE SIGNALS 04439 6076 - - - - - - -
BOOT RD WIDENING 04439 6077 - 148,889 - - - - -
MISCELLANEOUS FEES 04439 6080 30 21 32 - - - (32)
PAOLI & AIRPORT SIGNAL 04439 6081 - - - - - - -
TOTAL EXPENSES 30 148,910 32 - - - (32)
NET RESULT FROM OPERATIONS 1,016 (141,427) 1,718 22,979 19,500 (3,479) 17,782
ESTIMATED ENDING FUND BALANCE 610,353 468,926 470,644 491,905 511,405
  Impact Fees 344,520 349,804 350,054 364,430 376,430
  Non Impact Fees 265,833 119,121 120,589 127,475 134,975

SEWER OPERATING FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 1,000,248 1,021,129 1,158,670 1,158,670 971,770
REVENUE
INTEREST EARNINGS 05341 1000 418 7,664 12,000 35,191 30,000 (5,191) -14.8% 18,000
REVENUE - SEWER FEES 05364 1000 3,546,858 3,749,490 4,148,573 3,895,183 3,895,183 - 0.0% (253,390)
REVENUE - SEWER PENALTIES 05364 1010 28,773 34,559 45,076 27,476 27,476 - 0.0% (17,600)
REVENUE - LIEN PAYMENTS 05364 1025 72,133 52,830 69,614 19,678 19,678 - 0.0% (49,936)
REVENUE - SEWER CERTIFICATION FEES 05364 1030 2,380 4,270 4,000 2,173 2,173 - 0.0% (1,827)
REVENUE - WG CONVEYANCE FEE 05364 1040 15,935 22,649 20,935 54,571 54,571 - 0.0% 33,636
ADMIN.COST FROM WESTTOWN 05364 1060 4,827 2,896 4,827 4,713 4,713 - 0.0% (113)
O&M FEES FOR BARKWAY PUMP STATION 05364 1070 21,625 12,562 21,625 22,666 22,666 - 0.0% 1,041
O&M FEES FOR ASHBRIDGE PUMP STATION 05364 1080 1,807 - 1,807 4,867 4,867 - 0.0% 3,059
MISCELLANEOUS SEWER REVENUE 05380 1000 181 - - - - - -
SEWER INSURANCE CLAIMS 05391 2000 8,845 - - - - - -
TOTAL REVENUE 3,703,781 3,886,920 4,328,456 4,066,518 4,061,327 (5,191) -0.1% (267,129)
CHESTER CREEK EXPENSES
C.C. METERS -WAGES 05420 1400 12,891 14,175 19,169 2,043 2,104 61 3.0% (17,064)
C.C. INTERCEPTOR - WAGES 05420 1401 5,204 16,865 3,985 21,942 22,600 658 3.0% 18,615
C.C. COLLECTION - WAGES 05420 1402 38,874 28,629 40,637 35,151 36,205 1,055 3.0% (4,432)
C.C. COLLECTION - WAGES - I&I 05420 1404 13,297 1,282 2,015 - - - (2,015)
ASHBRIDGE WAGES 05420 1405 13,531 11,284 12,844 8,427 8,680 253 3.0% (4,164)
MILL VALLEY - WAGES 05420 1406 7,584 10,925 22,762 7,968 8,207 239 3.0% (14,555)
C.C. METERS -VEHICLE OPER. 05420 2510 9,406 10,286 7,199 1,304 1,343 39 3.0% (5,856)
C.C. INTERCPT-VEHICLE OPER 05420 2511 2,318 13,750 3,649 15,923 16,401 478 3.0% 12,752
C.C. COLLEC.-VEHICLE OPER. 05420 2512 23,191 16,508 14,741 37,309 38,428 1,119 3.0% 23,688
C.C. COLLECT.-VEH OPER - I&I 05420 2514 6,547 778 817 - - - (817)
ASHBRIDGE - VEHICLE OPER 05420 2515 5,428 5,917 3,684 5,792 5,965 174 3.0% 2,281
MILL VALLEY - VEHICLE OPER 05420 2516 3,270 5,991 17,224 5,358 5,518 161 3.0% (11,706)
C.C. METERS - UTILITIES 05420 3600 121 125 135 107 110 3 3.0% (25)
C.C. INTERCEPTOR-UTILITIES 05420 3601 1,345 1,442 1,377 1,554 1,601 47 3.0% 224
C.C. COLLECTION -UTILITIES 05420 3602 6,885 8,741 6,949 8,785 9,048 264 3.0% 2,099
ASHBRIDGE - UTILITIES 05420 3603 5,991 6,492 7,172 6,362 6,553 191 3.0% (619)
MILL VAL./BARKWAY UTILITIES 05420 3604 3,695 4,449 3,900 4,231 4,358 127 3.0% 458
C.C. METERS-MAINT.& REPRS. 05420 3700 3,732 13,616 11,176 6,388 6,580 192 3.0% (4,596)
C.C. INTERCEPT.-MAINT.&REP 05420 3701 5,432 12,902 3,142 4,540 4,676 136 3.0% 1,535
C.C. COLLEC.-MAINT.& REPR. 05420 3702 64,812 41,160 118,968 139,082 50,000 (89,082) -64.1% (68,968)
C.C. INTERCEPT.-MAINT & REP - I&I 05420 3703 3,843 5,499 5,774 4,824 4,969 145 3.0% (805)
C.C. COLLECT.-MAINT & REP - I&I 05420 3704 15,083 7,844 8,237 8,782 9,045 263 3.0% 808
ASHBRIDGE-MAINT.&REPR 05420 3705 5,084 19,203 16,188 267 9,275 9,008 3378.0% (6,914)
BARKWAY -MAINT.& REPR. 05420 3706 2,204 525 1,409 133 137 4 3.0% (1,271)
C.C. WEST GOSHEN OPER/MAINT 05420 3850 608,660 539,224 700,000 985,655 992,000 6,345 0.6% 292,000
TOTAL CHESTER CREEK EXPENSES 868,427 797,613 1,033,152 1,311,926 1,243,804 (68,121) -5.2% 210,652

31

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
RIDLEY CREEK EXPENSES
R.C. STP- WAGES 05422 1400 11,501 49,539 20,696 66,857 68,862 2,006 3.0% 48,166
R.C. COLLEC.- WAGES 05422 1401 84,660 33,001 60,000 54,940 56,589 1,648 3.0% (3,411)
R.C. COLLECTIONS WAGES I&I 05422 1402 8,198 10,326 7,223 - - - (7,223)
R.C. STP- CHEMICALS 05422 2440 109,686 123,321 116,295 108,635 111,894 3,259 3.0% (4,401)
R.C. COLLEC.-CHEMICALS 05422 2441 - - - 7,356 7,577 221 3.0% 7,577
R.C. STP-VEHICLE OPER. 05422 2510 3,372 45,071 5,918 61,240 63,078 1,837 3.0% 57,160
R.C. COLLEC-VEHICLE OPER. 05422 2511 49,686 17,514 14,802 15,505 15,970 465 3.0% 1,167
R.C. COLLECT.-VEH OPERATING - I&I 05422 2512 4,222 7,545 3,631 - - - (3,631)
R.C. STP-MINOR EQUIP. 05422 2600 2,127 - - - 15,600 15,600 15,600
R.C STP -UTILITIES 05422 3600 99,795 90,915 121,961 89,636 92,325 2,689 3.0% (29,636)
R.C. COLLEC.-UTILITIES 05422 3601 7,533 7,259 8,239 5,777 5,950 173 3.0% (2,289)
R.C. STP-MAINT.& REPAIRS 05422 3700 93,876 100,546 143,381 82,874 85,360 2,486 3.0% (58,020)
R.C. COLLEC.-MAINT.& REPR 05422 3701 72,762 57,922 62,172 46,073 47,455 1,382 3.0% (14,717)
R.C. COLLECTION-MAINT. & REP I&I 05422 3702 6,438 32,078 28,941 30,959 31,888 929 3.0% 2,946
RCSTP - APPLEBROOK 05422 3703 - - - 9,393 9,675
R.C. STP-CONTRACTED SERV. 05422 4500 192,074 214,511 221,578 204,914 211,062 6,147 3.0% (10,516)
R.C. SLUDGE-LAND CHESTER 05422 4502 43,070 44,208 43,971 52,681 54,262 1,580 3.0% 10,291
TOTAL RIDLEY CREEK EXPENSES 789,000 833,754 858,809 836,840 877,545 40,423 4.8% 18,737
Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ADMINISTRATION
MISCELLANEOUS EXPENSE 05424 2700 182 182 201 243 250 7 3.0% 49
ADMIN.- WAGES 05429 1400 86,208 114,216 89,220 84,468 87,002 2,534 3.0% (2,217)
PA ONE CALL - WAGES 05429 1401 1,723 6,801 3,424 8,904 9,171 267 3.0% 5,748
PA ONE CALL - VEH OPER 05429 2501 - 2,180 - 8,473 8,727 8,727
ADMIN.-COMPUTER EXPENSES 05429 2600 - - 6,388 - - - (6,388)
ADMIN.-GENERAL EXPENSE 05429 3000 36,162 37,811 1,029 1,274 1,312 38 3.0% 282
ADMIN.-PAYMENT PORTAL 05429 3001 6,891 7,661 5,431 7,585 7,812 228 3.0% 2,382
ADMIN.- PROFESSIONAL SERV 05429 3100 1,965 2,000 2,065 2,619 2,698 79 3.0% 633
ADMIN - LEGAL 05429 3140 4,616 675 3,530 1,249 1,287 37 3.0% (2,243)
ADMIN.- POSTAGE 05429 3250 4,726 5,175 5,053 5,322 5,482 160 3.0% 429
ADMIN. - PRINTING 05429 3400 722 2,061 1,731 1,945 2,003 58 3.0% 272
ADMIN.- INSURANCE 05429 3500 33,963 32,611 26,901 46,454 47,847 1,394 3.0% 20,947
ADMIN.-BLDG.OVERHEAD 05429 3730 58,801 65,814 88,760 88,760 91,423 2,663 3.0% 2,663
CONTR. SERV. SUMMIT HOUSE 05429 4500 349,320 369,000 385,125 385,125 396,679 11,554 3.0% 11,554
CONTR. SERV. CIDER KNOLL 05429 4510 78,720 59,040 86,789 86,789 89,392 2,604 3.0% 2,604
CONTR. SERV. MALVERN INSTITUTE 05429 4520 7,446 7,949 10,732 10,732 11,054 322 3.0% 322
LOCK BOX FEE 05429 5000 - - 3,859 - - - (3,859)
Bank Fees 05429 5001 1,311 1,495 1,380 1,380 1,380 - -
DVRFA--PRINCIPAL PMT ON $9,500,000 05471 7220 389,000 405,000 421,000 421,000 438,000 17,000 4.0% 17,000
DVRFA - PRINCIPAL ON DIVERSION LOAN 05471 7240 114,000 117,000 121,000 121,000 125,000 4,000 3.3% 4,000
SERIES 2017 GO BONDS - PRINCIPAL 05471 7250 120,000 125,000 130,000 130,000 135,000 5,000 3.8% 5,000
DVRFA - INTEREST ON $9,500,000 LOAN 05472 7220 223,839 208,118 191,763 191,763 174,755 (17,008) -8.9% (17,008)
DVRFA - INTEREST ON DIVERSION LOAN 05472 7240 53,952 50,453 47,778 47,778 44,089 (3,689) -7.7% (3,689)
SERIES 2017 GO BONDS - INTEREST 05472 7250 71,589 66,789 61,789 61,789 59,189 (2,600) -4.2% (2,600)
TRANSFER TO MUNIC AUTHORITY 05492 0700 90,338 90,979 100,000 100,000 100,000 - 0.0% -
TRANSFER TO BOND FUND - SEWER 05492 0805 - 50,000 - - - - -
TRANSFER TO SEWER CAPITAL RESERVE 05492 0900 290,000 290,000 800,706 290,000 290,000 - 0.0% (510,706)
TOTAL ADMINISTRATIVE EXPENSES 2,025,473 2,118,013 2,595,652 2,104,652 2,129,553 24,647 1.2% (466,099)
TOTAL SEWER EXPENSES 3,682,900 3,749,379 4,487,612 4,253,418 4,250,903 (3,051) -0.1% (236,710)
NET RESULT FROM OPERATIONS 20,881 137,541 (159,156) (186,900) (189,575) (2,676) (30,419)
ESTIMATED ENDING FUND BALANCE 1,021,129 1,158,670 999,513 971,770 782,194

REFUSE FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 530,140 494,810 564,927 564,927 326,854
REVENUE
INTEREST EARNINGS 06341 1000 165 3,208 6,000 12,271 10,000 (2,271) -18.5% 4,000
REVENUE - REFUSE FEES 06364 2000 994,965 1,314,802 1,317,332 1,276,889 1,276,889 - 0.0% (40,443)
REVENUE - REFUSE PENALTIES 06364 2010 9,743 11,254 10,853 9,557 9,557 - 0.0% (1,296)
REVENUE - LIEN PAYMENTS 06364 2025 26,313 19,836 24,713 7,458 7,458 - 0.0% (17,256)
REVENUE - REFUSE CERTIFICATION FEES 06364 2030 1,250 2,435 2,250 1,300 1,300 - 0.0% (950)
REVENUE - MISCELLANEOUS GRANTS 06364 2040 38,694 58,191 30,710 30,710 30,710 - 0.0% -
MISCELLANEOUS REFUSE REVENUE 06380 1000 3,075 - 168,000 - 168,000 168,000 -
TOTAL REVENUE 1,074,206 1,409,725 1,559,859 1,338,185 1,503,914 165,729 12.4% (55,945)
EXPENSES
REFUSE - WAGES 06427 1400 65,889 76,257 71,400 59,419 61,202 1,783 3.0% (10,198)
MATERIALS & SUPPLIES 06427 2440 5,686 5,095 159,000 159,000 163,770 4,770 3.0% 4,770
GENERAL EXPENSE 06427 3000 130 150 215 200 206 6 3.0% (9)
ADMIN - PAYMENT PORTAL 06427 3001 6,891 7,661 7,250 7,250 7,468 218 3.0% 218
PROFESSIONAL SERVICES 06427 3100 - - 17,667 17,667 - (17,667) -100.0% (17,667)
LEGAL SERVICES 06427 3140 4,616 675 5,000 5,000 5,000 - 0.0% -
POSTAGE 06427 3250 4,726 5,175 15,250 15,250 6,000 (9,250) -60.7% (9,250)
ADVERTISING & PRINTING 06427 3400 722 2,061 2,000 1,113 1,146 33 3.0% (854)
ADMIN.BLDG.OVERHEAD 06427 3730 5,976 9,515 8,000 9,317 10,000 683 7.3% 2,000
CONTRACTED SERV. 06427 4500 694,920 913,018 985,606 972,000 1,001,160 29,160 3.0% 15,554
LANDFILL FEES 06427 4502 308,812 302,094 322,938 276,667 284,967 8,300 3.0% (37,972)
COUNTY-HAZARD.WASTE PROG. 06427 4503 - - - - - - -
RECYCLING FEES 06427 4504 10,546 17,159 10,000 52,800 54,384 1,584 3.0% 44,384
LOCK BOX FEE 06427 5000 - - - - - - -
Bank Fees 06427 5001 621 748 500 575 592 17 3.0% 92
TRANSFER TO CREDIT CARD FUND 06492 0110 - - - - - - -
TOTAL EXPENSES 1,109,535 1,339,609 1,604,826 1,576,258 1,595,895 19,637 1.2% (8,932)
NET RESULT FROM OPERATIONS (35,330) 70,116 (44,967) (238,073) (91,981) 146,092 (47,014)
ESTIMATED ENDING FUND BALANCE 494,810 564,927 519,959 326,854 234,873

MUNICIPAL AUTHORITY, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 6,372 11,619 5,171 5,171 5,171
REVENUE
INTEREST EARNINGS 07341 1000 3 7 - 290 - (290) -100.0% -
INTEREST EARNED - CONSTRUCTION 07341 1020 - - - - - - -
DCED GRANT 07354 0400 - - 152,980 - - - (152,980)
C.C. TAPPING FEES 07364 1100 2,060 2,300 2,300 2,300 2,300 - 0.0% -
R.C.TAPPING FEES 07364 1110 11,508 2,089 2,000 8,574 8,574 - 0.0% 6,574
CONNECTION FEES - SEWER 07364 1130 3,368 564 1,000 1,128 1,128 - 0.0% 128
MISCELLANEOUS REVENUE (PINE ROCK) 07380 1000 2,664 282 282 564 564 - 0.0% 282
TRANSFER FROM GENERAL ACCT 07392 0100 - - - - - - -
TRANSFER FROM SEWER OPERATING 07392 0500 90,338 90,979 100,000 117,764 109,517 (8,247) -7.0% 9,517
TRANSFER FROM SEWER CAP RESV 07392 0501 - - - - - - -
TRANSFER FROM SEWER CAP RESERVE 07392 0900 179,592 286,657 1,471,553 635,907 837,464 201,557 31.7% (634,089)
TOTAL REVENUE 289,534 382,879 1,730,115 766,527 959,547 193,020 25.2% (770,568)
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 30,920 33,488 32,055 38,687 39,847 1,161 3.0% 7,792
MISCELLANEOUS EXPENSE 07424 3000 1,693 1,665 1,749 3,191 3,286 96 3.0% 1,538
MUNIC.AUTH.-AUDITING 07424 3110 10,000 10,250 10,815 21,000 21,630 630 3.0% 10,815
ENGINEERING SERVICES 07424 3130 55,389 42,469 47,250 47,250 48,668 1,418 3.0% 1,418
LEGAL SERVICES 07424 3140 9,194 6,640 8,400 8,400 8,652 252 3.0% 252
R.C. CAPITAL-STP 07424 7440 - - 355,793 - - - (355,793)
CAP.REPLACEMENT R.C. 07424 7490 (10,985) - 488,847 - 310,500 310,500 (178,347)
HERSHEY MILL STATION - ENGINEER 07426 1000 - - - - - - -
TALLMADGE DRIVE 07426 3000 - - - - - - -
RELINING 07426 3001 - - 260,000 260,000 - (260,000) -100.0% (260,000)
RESERVOIR PUMP STATION - ENGINEER 07428 1000 - - - - - - -
BARKWAY PUMP STATION CAPITAL 07429 1501 5,117 2,215 - - - - -
ASHBRIDGE PUMP STATION CAPITAL 07429 1502 30,324 11,493 - - - - -
HERSHEYS MILL PUMP STATION CAPITAL 07429 1503 76,693 153,399 78,000 78,000 85,000 7,000 9.0% 7,000
HUNT CO PUMP STATION CAPITAL 07429 1504 8,277 1,870 - - - - -
RCSTP CAPITAL 07429 1505 67,251 125,837 260,000 260,000 366,964 106,964 41.1% 106,964
WEST GOSHEN CAPITAL 07429 6100 - - 187,206 50,000 75,000 25,000 50.0% (112,206)
Bank Fees 07491 5001 414 - - - - - -
TRANSFER TO GENERAL FUND 07492 0100 - - - - - - -
TOTAL EXPENSES 284,287 389,327 1,730,115 766,527 959,547 193,020 25.2% (770,568)
NET RESULT FROM OPERATIONS 5,247 (6,448) 0 (0) 0 1 0
ESTIMATED ENDING FUND BALANCE 11,619 5,171 5,172 5,171 5,171

BOND FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 3,184,623 2,787,774 2,346,068 2,346,068 1,295,326
  General Fund Portion 2,391,418 1,997,152 1,890,227 1,890,227 1,295,326
  Sewer Portion 793,205 790,622 455,842 455,842 0
REVENUE
INTEREST EARNINGS 08341 1000 487 28,211 30,000 86,693 71,243 (15,450) -17.8% 41,243
INTEREST - SEWER 08341 1010 133 9,720 1,500 2,500 - (2,500) -100.0% (1,500)
TRANSFER FROM SEWER FUND 08392 0500 - 50,000 - - - - -
TOTAL REVENUE 487 78,211 31,500 86,693 71,243 (15,450) -17.8%
WEST GOSHEN STP IMPROVEMENTS 08429 6000 2,583 411,392 388,224 458,341 - (458,341) -100.0% (388,224)
MILLTOWN DAM ENGINEERING 08454 6010 17,576 37,430 1,215,887 182,056 182,056 - 0.0% (1,033,832)
MILLTOWN DAM CONSTRUCTION 08454 6020 - - - 497,038 1,009,138 512,100 103.0% 1,009,138
HERSHEY'S MILL ENGINEERING 08454 6050 122,495 13,920 - - - - -
HERSHEY'S MILL CONSTRUCTION 08454 6060 - 39,113 - - - - -
MISC TRAIL EXPENSES 08459 6000 105,473 17,812 - - - - -
SEGMENTS A&B ENGINEERING 08459 6001 125,954 - - - - - -
SEGMENT C ENGINEERING 08459 6003 9,306 - - - - - -
SEGMENTS D&E ENGINEERING 08459 6005 7,002 - - - - - -
SEGMENTS F&G REIMBURSEMENT 08459 6006 6,947 250 - - - - -
TOTAL EXPENSES 397,336 519,917 1,604,111 1,137,435 1,191,193 53,758 4.7% (412,918)
NET RESULT FROM OPERATIONS (396,849) (441,706) (1,572,611) (1,050,742) (1,119,950) (69,208) 6.6% 452,661
ESTIMATED ENDING FUND BALANCE 2,787,774 2,346,068 773,457 1,295,326 175,376
  General Fund Portion 1,997,152 1,890,227 704,340 1,295,326 175,375
  Sewer Portion 790,622 455,842 69,118 0 0

SEWER CAPITAL RESERVE FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 2,250,329 2,361,152 2,384,772 2,384,772 2,130,452
REVENUE
INTEREST EARNINGS 09341 1000 830 28,246 22,500 91,588 85,870 (5,717) -6.2% 63,370
TRFR FROM SEWER OP FOR SEWER CAP RESRV 09342 0500 290,000 290,000 800,706 290,000 290,000 - 0.0% (510,706)
TRANSFER FROM SEWER CAP RESERVE 09392 0300 - - - - - - -
TRANSFER FROM MUNICIPAL FUND 09392 0700 - - - - - - -
TOTAL REVENUE 290,830 318,246 823,206 381,588 375,870 (5,717) -1.5% (447,336)
EXPENSES
MACHINERY/EQUIPMENT - REPLACEMENT 09429 7400 - 7,969 - - - - -
MACHINERY/EQUIPMENT - NEW 09429 7450 - - - - - - -
Bank Fees 09491 5001 414 - - - - - -
TRANSFER TO MUNIC AUTHORITY 09492 0700 179,592 286,657 1,471,553 635,907 837,464 201,557 31.7% (634,089)
TOTAL EXPENSES 180,006 294,626 1,471,553 635,907 837,464 201,557 31.7% (634,089)
NET RESULT FROM OPERATIONS 110,823 23,620 (648,347) (254,320) (461,594) (207,274) 186,753
ESTIMATED ENDING FUND BALANCE 2,361,152 2,384,772 1,736,425 2,130,452 1,668,859

OPERATING RESERVE FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 2,630,163 2,784,888 1,558,608 1,558,608 1,628,608
REVENUE
INTEREST EARNINGS 10341 1000 1,022 23,720 46,500 70,000 81,430 11,430 16.3% 34,930
TRANSFER FROM GENERAL ACCT. 10392 0100 154,117 - - - - - -
SUBTOTAL 155,139 23,720 46,500 70,000 81,430 11,430 16.3%
EXPENSES
Bank Fees 10491 5001 414 - - - - - -
TRANSFER TO INFRASTRUCTURE SUSTAINABILITY FUND 10492 1200 - 1,250,000 - - - - -
SUBTOTAL 414 1,250,000 - - - - -
NET RESULT FROM OPERATIONS 154,725 (1,226,280) 46,500 70,000 81,430 11,430 16.3% 34,930
ESTIMATED ENDING FUND BALANCE 2,784,888 1,558,608 1,605,108 1,628,608 1,710,039

ARPA FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE - 914,664 963,936 963,936 158,340
REVENUE
INTEREST EARNINGS 19341 1000 44 14,173 - 12,000 1,320 (10,680) -89.0% 1,320
ARPA - COVID RELIEF 19354 1000 949,821 955,827 - - - - -
SUBTOTAL 949,865 970,000 - 12,000 1,320 (10,680) -89.0% 1,320
EXPENSES
HYBRID MEETING ROOM 19409 7400 35,201 769 - - - - -
BOARD APPROVED SEWER PROJECTS 19409 6099 - - - - 159,660
WTWPS 19409 6060 - 913,244 - - - - -
HERSHEY MILL SEWER PROJECT 19409 6050 - 6,716 - 817,595 - (817,595) -100.0% -
SUBTOTAL 35,201 920,729 - 817,595 159,660 (657,935) -80.5% 159,660
NET RESULT FROM OPERATIONS 914,664 49,272 - (805,595) (158,340) 647,255 -80.3% (158,340)
ESTIMATED ENDING FUND BALANCE 914,664 963,936 963,936 158,340 (0)

INFRASTRUCTURE SUSTAINABILITY FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE - 339,058 1,794,949 1,794,949 1,775,318
REVENUE
INTEREST EARNINGS 12341 1000 - 23,609 33,000 79,747 83,766 4,018 5.0% 50,766
TRANSFER FROM OPERATING RESERVE FUND 12392 0110 - 1,250,000 - - - - -
TRFR FROM GENERAL FUND 12392 0100 339,058 200,258 - - - - -
SUBTOTAL 339,058 1,473,867 33,000 79,747 83,766 4,018 5.0% 50,766
EXPENSES
BOW TREE POND 1 12454 3707 - 17,048 500,000 99,379 91,850 (7,529) -7.6% (408,150)
TRFR TO GENERAL FUND 12492 0100 - 927 - - - - -
SUBTOTAL - 17,975 500,000 99,379 91,850 (7,529) -7.6% (408,150)
NET RESULT FROM OPERATIONS 339,058 1,455,891 (467,000) (19,632) (8,084) 11,547 -58.8% 458,916
ESTIMATED ENDING FUND BALANCE 339,058 1,794,949 1,327,949 1,775,318 1,767,233