Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 final.doc 1

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

March 11, 2013

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, March 11, 2013 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Fran Beck, Jack Yahraes, Dana Pizarro and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio, (Township Supervisor), Mark Miller (Director of Public Works), Bob Adams, (Solicitor), Dan Barbato (Pennoni), Scott Towler (BFES), and Walter Wujcik (Conservancy Board). COMMON ACRONYMS: BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PR – Park & Recreation Board EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant HC – Historical Commission SBR – Sequencing Batch Reactor I&I – Inflow & Infiltration SSO – Sanitary System Overflow LCSTP – Lochwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Fran called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Fran asked if anyone would be recording the meeting and there was no response. Chairman’s Report Ed McAssey reported that he attended the West Goshen meeting on March 6, 2013. Most of the meeting was devoted to Goose Creek. They feel that by mid-May they will know if it will go to trial or not. They are going to send a notice to their customers. Approval of Minutes The Chairman noted that the minutes of the February 11, 2013 meeting were approved as corrected. Approval of Invoices 1. Jack moved to approve payment of 5 Pennoni invoices: #537504 $5,033.00 #537505 $2,167.75 #537506 $ 570.00 #537507 $2,494.00 #537508 $2,496.75 Dana seconded the motion. The motion passed unanimously. Liaison Reports 1. Conservancy Board – Walter reported that they staked the locations for the dogwood trees to be planted along E Boot Rd. Woodlawn is the contractor and will start in April. They will

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 final.doc 2

fertilize the area based on the soil report. They will review their goals in the Comprehensive Plan. 2. Board of Supervisors – Carmen reported that the Township’s finances are in good shape and the Comprehensive Plan Task Force had its first meeting. Financial Reports 1. Jon Altshul, CFO, provided reports with the following comment: The Municipal Authority recorded $19,794.15 in expenses and $32,118.39 in revenues (mostly from a $30,000 transfer from the sewer capital reserve fund, but also from the Pine Rock repayment) in the month of February, a difference of $12,324.24. The Fund balance is now $55,234.11. He also attached a worksheet for the 2013 quarterly administrative charge back of $7,980.36. Dana noted that the 2 pump stations are over budget. Rick will mention it to Jon but the Capital Reserve should cover that. Fran spoke to Brian McCool about the options that are available to residents for paying their sewer bill. Rick verified that they can use a check, automatic payment from their checking account or a credit card which has a processing fee. Fran and Dana feel that these haven’t been explained and are confusing. Rick will put something in the next newsletter. Dana requested a detailed account breakdown with the financial reports. Old Business None Goals 1. All of the Authority members think that the use of “Goals” by the Supervisors and “Action Items” in the Comprehensive Plan are confusing. One or the other should be used, not two different terms. Rick explained that the BOS wants the Authority to review the Action Items. Rick will prepare a list for the next meeting. Jack commented that the first 2 items on the Goals list should be in BOLD type since they are completed. New Business 1. Rick reported that the Township received a letter from the EPA. He noted that East Goshen does not accept anything from shale gas and only accepts domestic sewage. 2. The new NPDES inspector, Michael Brenner, met with Scott Towler and went through the Ridley Creek plant. The Authority reviewed his report and was very pleased. 3. The agreement with Willow Pond was previously signed, but due to an error, it has to be re-signed. Rick gave the copies to Fran and Ed to sign. Capacity Requests None Sewer Reports 1. Mark Miller, Director of Public Works, provided the following report for February: Meters – The meters have been installed and are working well. We had a problem with the portable meter at Reservoir and Strasburg Road. Allied Control found the main board had failed. The meter was pulled and sent out for repair. Pump Stations – Were visited on a daily basis. Bar screens were cleaned and the walls were cleaned. The Mary Dell pump station called in several alarms last Sunday. We

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 final.doc 3

found a bad float which was replaced. We contacted Aqua Wastewater to vac the wet well due to heavy grease build up. CC Collection: We were notified of a lateral backup at 1448 Linden Lane. We made several attempts to clear the clog; unfortunately the cog was in the trap. We utilized the jetter to clean the main. Once that was done, we dropped the camera in the main and televised the 8” line which was clear. However, when we looked at the lateral connection, we could see heavy root buildup. We made several more attempts to clear the roots to no avail. We excavated the lateral and found the trap completely blocked. We installed a new trap and clean out. We televised the lateral prior to backfilling and everything is ok. We were notified of a manhole over flowing on Paoli Pike. It turned out to be a Verizon manhole. R.C. Collection: We did televising of some lines at Pulte homes to investigate for sump pump tie-ins. We found no evidence of sump pumps. R.C. Plant: The plant operator notified us of heavy grit build up in front of the muffin monster. I contacted Aqua Wastewater for a vac truck. The line was completely cleaned. Lenni Electric was utilized to install four – 220 outlets for the pressure washer at various locations at the plant. We are in the process of fabricating three pipe stands for the filtration pumps. This will allow us to remove pumps for servicing. Pipe Data View cleaned and televised 20,000 feet of pipe between both systems during the month. No pipe problems to report; however, we needed to replace several manhole castings. Alarms: We received a total of 26 alarms PA One Calls: We received 58 PA One calls for the month of February. Mark commented that with the abandonment of the Reserve pump station, he wants to pull the equipment and put it in Hunt Country. Some items are no longer available. The building will have to be modified to fit the equipment but that can be done “in house”. 2. Pennoni: Dan Barbato provided the following engineer’s report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP) – Pennoni continues to coordinate with the Plant Operator and will provide operations assistance as needed. No issues were brought to our attention in February. Our review of the monthly operations report does not indicate any concerns. Marydell PS Elimination – We attended a pre-construction meeting with the Township and Ply-Mar Construction (Contractor) and a follow-up pre-construction meeting with the Township, Ply-Mar, PennDOT and PECO. We issued a contract award letter to Ply-Mar. We have also reviewed Ply-Mar’s contract documents and have coordinated with them to have their insurance coverage revised to comply with contract requirements. They informed us they are in the process of having their insurance revised, but they do not yet have a revised insurance certificate to submit for review and approval. Pending approval of the insurance, we intend to issue the Notice to Proceed with Construction on March 18, 2013. Ply-Mar intends to mobilize later that week and begin construction on March 25. They estimate 6-8 weeks to complete the project.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 final.doc 4

We continued attempts to coordinate with the various affected utility providers. PECO will brace utility poles during the work, but we are awaiting a determination from them as to how exactly they will brace them. We have submitted plans to Sunoco and Verizon, and are still awaiting feedback from them. We prepared a Construction Issue set of plans and specifications incorporating changes from the four addenda, and the documents were issued to Ply-Mar and the Township. We also prepared a CAD file and plan with critical survey information for the Contractor’s use in construction layout. Additionally, we reviewed a partial submission of shop drawings from the Contractor. Hershey’s Mill PS Diversion: We issued a contract award letter to the Contractor, Delaware Valley Utility Contractors (DVUC). We have also reviewed DVUC’s contract documents and have coordinated with them to have their insurance coverage revised to comply with contract requirements. DVUC proposes to begin work on May 6, 2013. We intend to issue the Notice to Proceed with Construction by early April. They estimate approximately one month to complete the project. We prepared a Construction Issue set of plans and specifications incorporating changes from the two addenda, and the documents were issued to the Township. We are also in the process of reviewing shop drawings from the Contractor. Reserve PS Elimination – We completed near-final Bid Plans and submitted them to the Township for review. The specifications will be completed and submitted for Township review. The specifications will be completed and submitted to the Township for review by March 15. The project will be put out to bid after the Reserve at Spring Meadows HOA has granted the easement and rock borings are performed. Chapter 94 Annual Reports – We have continued to collect data and information required to prepare the reports. We analyzed portable and permanent meter data from calendar year 2012, and we are in the process of preparing the reports for the Ridley Creek, West Goshen, and Westtown Service Areas. DEP previously informed us that a full report is not required for the Lockwood Chase STP. 3. Big Fish Environmental Services, Inc., Scott Towler presented a report for February 2013. The following is a summary: Treatment Process Operation During February, there were no exceedances of the final effluent discharge limitations for outfall 001. There was no discharge from outfall 002. The monthly average total phosphorus concentration was 0.20 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from <0.14 mg/L to .026 mg/L. Sequencing Batch Reactors (SBRs) number 1, 3, and 4 were in service during the month of February. Process monitoring of each SBR included ammonia as N, nitrite as N, nitrate as N, COD, SSV, MLSS and total phosphorus. Microscopic examinations and physical observation of the SBR MLSS and foam color is ongoing. Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 final.doc 5

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was largely consistent through February with increasing uniformity during the month. The addition of Aluminum Sulfate Solution, using the LMI chemical feed pump, prior to the disc filters has assisted with improving total phosphorus from the final effluent outfall. SBR No 2 remains out of service. The remaining contents are continuously mixed and are aerated (blower in hand mode at reduced speed) to prevent odors. Transfer of the remaining mixed liquor will occur as freezing conditions are minimized. Process Monitoring On-Line Instrumentation – Kershner Technologies installed a ChemScan phosphate analyzer on January 29, 2013. Comparison data from the online analyzer and on site testing is ongoing. Representatives from the Hach Chemical Company have requested an opportunity to conduct a pilot study demonstrating their online phosphorus monitoring system. Coordination of a pilot study is planned to begin late March or April. The flow meter appears to have malfunctioned as observed through recording significantly higher flow volumes than the influent flow meter to the SBR. Allied Control Services (ACS) was contacted to address the malfunction. Solids Dewatering and Disposal – During the month, the centrifuge dewatering system was placed in service. Sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids. Sludge holding tank No.1 was in service. The level at the beginning of the month was 4.93 feet and the level at the end of the month was 12.28 feet. The initial total solids concentration was 0.66% and ended the month as 0.80% total solids. Zero (0) gallons of supernatant were decanted during the month. Sludge holding tank No. 2 was in service. The level at the beginning of the month was 14.48 feet and the level at the end of the month was 2.53 feet. The initial total solids concentration was 0.87% and ended the month as 0.70% total solids. 27,475 gallons of supernatant were decanted. Sludge was dewatered using the centrifuge. Significant Storm Events – During February there were no significant precipitation events impacting the treatment process. Minor repairs and Preventative Maintenance: • ACS repaired influent flow chart recorder. • ACS provided a flow meter signal cable and connected the new influent “field” flow meter to allow for flow proportioned composite sampling. • Centrifuge gear box was inspected for routine O&M. No metal filings were observed. • Centrifuge rear bearing is operating at a higher temperature than the front bearing. The bearing temperature is generally around 150°F. Emergency shutdown is 212°F. Centrifuge operators recommend corrective actions should the temperature rise above 180°F. • Field influent composite sampler controller failed. The controller from another sampler was temporarily installed until the repaired unit is returned. A spare unit is planned for purchase. Mark asked Scott if they will have to put the soda ash in the top. When Scott answered yes, Mark mentioned that he wants to cut a path to make the process more efficient.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 final.doc 6

Scott feels that is a good idea but in the future maybe they should look at a Dry Feed System. Any Other Matter 1. Rick reported that Westtown is in the process of approving the demolition of the old gas station, WAWA, and current PNC Bank at Rts. 3 & 352. The PNC Bank will build a new building at the corner and a Rite Aid pharmacy will be built on the other lots. Their sewer use is based on a percentage. Correspondence None Adjournment There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00pm. Respectfully submitted, Ruth Kiefer Recording Secretary

East Goshen Township General Ledger
Report Date 03/12/13
GL Transaction Details
PAGE 1

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1301 JE 36010 0.74 02/05/13 INTEREST INTEREST EARNED JANUARY 2013
07 FUND
0.00 0.74 -0.74
1302 36396 0.48 03/04/13 INTEREST INTEREST EARNED FEB. 2013
07 FUND
0.00 0.48 -1.22
0.00 1.22 -1.22
07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00
1301 36011 3.97 02/05/13 INTEREST INTEREST EARNED JANUARY 2013
07 CONSTRUCTION FUND
0.00 3.97 -3.97
1302 36397 4.91 03/04/13 INTEREST INTEREST EARNED FEB.2013
07 CONSTRUCTION FUND
0.00 4.91 -8.88
0.00 8.88 -8.88
07364-1110 R.C.TAPPING FEES 0.00
1301 35931 2,000.00 01/30/13 REV TRX REVERSE TRX #32779 TAP IN FEE
FOR 913 SORRELL HILL
35934 2,000.00 01/30/13 REV TRX RE-REVERSE TRX 35931 FOR 913
SORRELL HILL TAP IN FEES
2,000.00 2,000.00 0.00
2,000.00 2,000.00 0.00
07364-1130 CONNECTION FEES - SEWER 0.00
1302 CR 36075 423.00 02/08/13 264 7195 1 JACOBS, ROBERT & CHERYL
423.00 02/08/13 755 7193 1 GEORGE SMITH & CHRISTINA CONLE
*** 0.00 846.00 ***
36147 423.00 02/13/13 11 6577 1 PAPPANO, JOSEPH & PATRICIA
421.00 02/13/13 11 7196 1 PAPPANO, JOSEPH & PATRICIA
*** 0.00 844.00 ***
36193 423.00 02/15/13 2173 7194 1 STOFFLET, MICHAEL
JE 36174 282.24 02/14/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
36194 141.12 02/15/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
423.36 2,113.00 -1,689.64
423.36 2,113.00 -1,689.64
07380-1000 MISCELLANEOUS REVENUE 0.00

East Goshen Township General Ledger
Report Date 03/12/13 GL Transaction Details PAGE 2

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1302 JE 36174 282.24 02/14/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
36194 141.12 02/15/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 423.36 -423.36
0.00 423.36 -423.36
07392-0900 TRANSFER FROM SEWER CAP RESERVE 0.00
36187 30,000.00 02/15/13 XFER XFER $ FROM 9100.1000 TO 7100.
1000 TO COVER MA EXPENSES
0.00 30,000.00 -30,000.00
0.00 30,000.00 -30,000.00
07424-3000 MISCELLANEOUS EXPENSE 0.00
1301 CD 35598 500.00 01/03/13 2153 2737 DEP - COMMONWEALTH OF PA
NPDES PERMIT - 2013 MINOR SEWAGE
FACILITY
35783 950.00 01/18/13 2158 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2013 ACTIVE MEMBERSHIP DUES
1,450.00 0.00 1,450.00
1,450.00 0.00 1,450.00
07424-3130 ENGINEERING SERVICES 0.00
35695 3,264.75 01/15/13 2156 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/9/12 2012 GEN.SERV
3,264.75 0.00 3,264.75
1302 36119 1,538.75 02/12/13 2162 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/13/13 GEN.SERVICES 2
1,538.75 0.00 4,803.50
4,803.50 0.00 4,803.50
07424-3140 LEGAL SERVICES 0.00
1301 35695 3,289.10 01/15/13 2155 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 11/9-11/30/12 GEN.AU
3,289.10 0.00 3,289.10
1302 36119 1,406.80 02/12/13 2161 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - JAN. 2013 GEN.AU
1,406.80 0.00 4,695.90
4,695.90 0.00 4,695.90

East Goshen Township General Ledger
Report Date 03/12/13 GL Transaction Details PAGE 3

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-7475 LOCHWOOD ABANDONMENT ENGINEER 0.00
1301 35695 511.50 01/15/13 2156 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/9/12 HERSHEY M
PUMP STATION MUFFIN MONSTER
511.50 0.00 511.50
1302 36119 574.50 02/12/13 2162 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/13/13 H.MILL PS MUF
MONSTER DESIGN
574.50 0.00 1,086.00
1,086.00 0.00 1,086.00
07424-7476 LOCHWOOD ABANDONMENT CONSTRUCTION 0.00
1301 35598 246.01 01/03/13 2152 317 CONTRACTOR'S CHOICE
ORANGE SAFETY FENCE, STAKES & PA
35695 1,482.40 01/15/13 2154 425 EAST GOSHEN TOWNSHIP
LOCHWOOD PLANT CLOSING COSTS-LAB
35698 -1,482.40 01/15/13 2154 425 EAST GOSHEN TOWNSHIP
VOID CK. 2154 - DUPLICATE PAYMEN
246.01 0.00 246.01
246.01 0.00 246.01
07424-7477 LOCHWOOD ELIMINATION PHASE 2 0.00
35872 379.90 01/24/13 2159 2762 A.J. BLOSENSKI INC.
30 YDS. ROLLOFF HAULING & LANDFI
FEE
379.90 0.00 379.90
1302 36189 200.00 02/15/13 2165 2762 A.J. BLOSENSKI INC.
30 YARD ROLLOFF HAULING FEE
JE 36105 379.90 02/11/13 VOID CHECK VOID CK. 2159 - OVERCHARGED BY
VENDOR - RETURNED CHECK
200.00 379.90 200.00
579.90 379.90 200.00
07425-1000 MARYDELL PUMP STATION - ENGINEER 0.00
1301 CD 35695 5,493.75 01/15/13 2156 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/9/12 MARYDELL
5,493.75 0.00 5,493.75
1302 36119 5,988.75 02/12/13 2162 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/13/13 MARYDELL PS
5,988.75 0.00 11,482.50

East Goshen Township General Ledger
Report Date 03/12/13 GL Transaction Details PAGE 4

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
11,482.50 0.00 11,482.50
07426-1000 HERSHEY MILL STATION - ENGINEER 0.00
1301 35695 2,047.12 01/15/13 2156 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/9/12 HERSHEY MILL
35783 250.00 01/18/13 2157 263 CHESTER COUNTY CONSERVATION DISTRICT
PERMIT FEE - HERSHEY MILL DAM
2,297.12 0.00 2,297.12
1302 36119 2,600.00 02/12/13 2160 2911 EARTHCORE SERVICES LLC
MOBILIZATION ATV RIG-HMPS DIVERS
2,932.62 02/12/13 2162 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/13/13 HERSHEY MILL
*** 5,532.62 0.00 ***
5,532.62 0.00 7,829.74
7,829.74 0.00 7,829.74
07427-1000 RESERVE PUMP STATION - ENGINEER 0.00
1301 35695 2,047.13 01/15/13 2156 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/9/12 RESERVE PS
2,047.13 0.00 2,047.13
1302 36119 2,932.63 02/12/13 2162 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/13/13 RESERVE PS
1,000.00 02/12/13 2163 3027 SCHRODER, JOHN
SEWER RIGHT OF WAY
1,000.00 02/12/13 2164 3029 WILLOW POND HOMEOWNERS ASSOCIATION
SEWER RIGHT OF WAY
*** 4,932.63 0.00 ***
4,932.63 0.00 6,979.76
6,979.76 0.00 6,979.76
Beg Bal 0.00 41,576.67 34,926.36 6650.31