Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

December 9, 2013

Monday 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. APPROVAL OF MINUTES November 11, 2013
  4. APPROVAL OF INVOICES a. Gawthrop Greenwood #113959 $ 500.00 b. Gawthrop Greenwood #113960 $ 831.71 c. Pennoni #569529 $ 367.50 d. Pennoni #569530 $ 401.50 e. Pennoni #569531 $ 3,031.25 f. Pennoni #569532 $ 4,376.50
  5. LIAISON REPORTS
  6. FINANCIAL REPORTS November 2013 Reports
  7. OLD BUSINESS a.
  8. GOALS November Goals
  9. NEW BUSINESS Consider Pennoni 2014 Proposal; Consider Proposed Budget for 2014; Authorize Chairman to Execute Fifth Supplemental Lease
  10. CAPACITY REQUESTS a.
  11. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc Report with DMR’s; East Goshen Township Flows for November 2013 – having issues with new meters, I will have them next month.

F:\Data\Shared Data\Agendas\Municipal Authority\2013\12-09-13.doc

  1. ANY OTHER MATTER
  2. CORRESPONDENCE AND REPORTS OF INTEREST
  3. PUBLIC COMMENT
  4. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Website Posting Date

F:\Data\Shared Data\Agendas\Municipal Authority\2013\12-09-13.doc

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

November 11, 2013

The East Goshen Township Municipal Authority held their regular public meeting on Monday, November 11, 2013 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Fran Beck, Dana Pizarro, Ed McAssey, Jack Yahraes and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Scott Towler (BFES), Bob Adams (Atty), Mike Ellis (Pennoni), and Mark Miller (Director of Public Works).

COMMON ACRONYMS:

Acronym Acronym
BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental Protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Fran called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Fran asked if anyone would be recording the meeting and there was no response.

Chairman’s Report/Other Member’s Reports

Dana reported that he attended a seminar about INI. He will forward the materials to Rick and Mark.

Approval of Minutes

The Chairman noted that the minutes of the October 14, 2013 meeting were approved as corrected.

Approval of Invoices

1. Jack moved to approve payment of the following Pennoni invoices:

a. Pennoni #566093 $ 105.00

b. Pennoni #566094 $ 1,934.50

c. Pennoni #566095 $ 7,597.75

d. Pennoni #567776 $18,056.50

e. Pennoni #566097 $ 680.00

Ed seconded the motion. The motion passed unanimously.

f. Ronald Smith App #2 for $32,088.71. Jack moved to approve payment in the amount of $32,088.71 for the Ronald Smith App#2. Dana seconded the motion. The motion passed unanimously.

g. Dana moved to approve payment of the MGK Industries, Inc. #4487 for $7,250.00. Kevin seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 11-11-13 draft.doc

1

h. Jack moved to approve payment of the Gawthrop invoice for $1,331.71. Dana seconded the motion. The motion passed unanimously.

Financial Reports

Jon Altshul’s November 4, 2013 report - The Municipal Authority recorded $2,562,102 in revenues and $957,570 in expenses in October, a difference of $1,604,532. The fund balance is now $1,655,909. The overwhelming majority of the expenditures and revenues this month were related to the proceeds of the $2.5 million DelVal note, which closed on October 15.

That 20-year note closed with an interest rate of 3.049%. Interest on the note is now being paid out of the sewer operating fund and the first principal payment is scheduled for October 2014. $1.6 million is being retained by the Municipal Authority for the anticipated costs associated with the Reservoir Road Pump Station project. The remaining balance of the loan proceeds ($877,000 or $900,000 minus the various costs of issuance) was transferred to the Sewer Sinking Fund (formerly the Sewer Capital Reserve Fund) as a reimbursement for the cost of the various diversion projects.

In addition, $67,552 in expenses was incurred for the Reserve pump station project; $7,558 was incurred for the Hershey Mill pump station project; and $2,020 was incurred for the Reservoir Road pump station project.

Goals

Kevin mentioned that he did submit an article for the Newsletter.

Ed will attend the 4th Quarter West Goshen meeting in December.

New Business

In a letter dated October 13, 2013, Maillie LLP, CPAs, described their audit objective and scope. The cost of the proposed audit will be $10,800, which includes $8,300 audit fee and $2,500 due to the new bond issue and various construction projects. Jack moved to accept the proposal from Maillie LLP for $10,800. Dana seconded the motion. The motion passed unanimously.

Capacity Requests

Patricia O’Neill, 1637 Manley Road, subdivision – Rick explained that the resident wants to subdivide one acre of her property. Kevin moved to authorize execution of the Sewer Capacity Reservation Agreement for Patricia O’Neill. Jack seconded the motion. The motion passed unanimously.

Sewer Reports

1. Mark Miller, Director of Public Works -

Meters: All meters were read on a daily basis. We are waiting on bands for the probes before we can install the portable meters.

Pump Stations: Were visited on a daily basis.

C.C. Collection: We cleaned and televised 4050 feet in the Meadows. We will begin cleaning and televising Supplee Valley on Thursday. We replaced all the castings and lids in Grand Oak, Clover Land and Heather Lane. We have been having problems with the Hershey Mill Pumping Station. It appears that the main controller for the pumps is failing. A new controller has been ordered.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 11-11-13 draft.doc

2

R.C. Collection: The contractor has finished the sewer line at the Reserve. The new line was televised by the contractor. The pump station was stripped out by the Public Works Dept. The pumps were sent to Deckmans for the rebuild. They also will be changing the impellors for use at the Hunt Country Pump Station.

I met with the property owner that backs up to the Hunt country Pump Station to explain the renovations to the pump station. The resident was ok with what we are going to do.

R.C. Plant: No problems to report

Alarms: We received a total of 27 alarms in October.

PA One Calls: We received 86 PA One calls for the month of October.

Lateral repairs: 5 for the C.C. Collection

2 for the R.C. Collection

INI report: On Thursday we tried out the new smoke tester on the Ridley Creek interceptor line. We also found a significant break in Supplee Valley and on Baldwin Drive. Repairs are scheduled for Tuesday Nov. 12, 2013.

Mark mentioned that they are done road paving. This winter the will do smoke testing throughout the township. They will send letters to the residents, and notify the fire company and 911.

Also, the Hersheys Mill Pump Station lost a flow meter which will cost about $4,000. He turned a claim in to the insurance company.

2. Pennoni – Mike Ellis gave the following report for October:

RCSTP – Pennoni continues to provide operations assistance as needed. No issues were brought to our attention in October.

Reserve PS Elimination – We performed daily part-time construction observation of sewer installation, testing, pump station demolition, and restoration. We also reviewed and processed Payment Application #2.

Wastewater was diverted into the new sewers on October 15, 2013. All work on the project has been completed including restoration. Before recommending final payment, the contractor needs to provide a letter from their geotechnical engineering confirming adequate backfill compaction within the detention basin berm as well as written notification that they will return in the spring to remove the filter sock along the creek.

Reservoir Road Pump Station Act 537 Plan – We have continued the topographic and existing conditions field survey of the proposed pump station parcel and proposed force main route to the tentatively proposed gravity sewer connection in Bow Tree. We made a PA One Call request and have received responses that utility providers are physically marking their facilities in the area of the proposed pump station and along the proposed force main route. Once all utilities are marked, we will complete the field survey and finalize the existing conditions plan.

Our modeling indicates the Ridley Creek interceptor likely does not have adequate capacity for 300,000 gpd from the pump station. Mark Miller has field confirmed the pipe sizes and materials in the modeling, which are 15” diameter PVC. We are coordinating to obtain interceptor as-built plans in order to confirm modeled pipe slopes to determine if the model may be underestimating capacities.

We have prepared and submitted conceptual scopes, mapping, and construction cost estimates for five force main routing alternatives to the Township for review and discussion. The base alternative assumes no upgrades to any existing gravity interceptor sewers; whereas, the four other alternatives are based upon replacing approximately 1,000 L.F. of interceptor sewers with

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 11-11-13 draft.doc

3

larger pipes. The Act 537 Plan will be completed and submitted to the review agencies after the routing and extents of the force main and sewer upgrades are determined.

Semi-Annual I/I Report – The semi-annual report was finalized and submitted to the Township.

Hunt Country Pump Station – We performed field visits with Mark Miller to both the Hunt Country and Reserve Pump Stations in late September to evaluate the feasibility of replacing the pumps, generator, and other equipment at the Hunt Country PS with the equipment the Township removed from the Reserve PS. We performed a cursory analysis of the design operating points of the pumps based upon available information, and it appears the Reserve PS pumps are oversized for use in the Hunt country PS and will need smaller impellors. We are awaiting further design data on the Hunt Country PS system curve in order to determine the exact impellor size required. We have prepared a draft memo summarizing our findings and recommendation.

3. Big Fish Environmental Services – The following is a summary of Scott’s report for October 2013:

Treatment Process Operation- During September 2013, there were no exceedances of the final effluent discharge limitations for Outfall 001 and Outfall 002.

The monthly average total phosphorus concentration was 0.39 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.18 mg/L to 0/60 mg/L. Two additional samples were collected and analyzed during the month.

Flow to Applebrook, Outfall 002, continued during September and mid-October.

In October, Mike Brenner, Water Quality Specialist from PA DEP was on site to conduct a facility inspection. No Violations were observed. Overall, the report indicated that they facility and final effluent are in good condition.

During October, there are no exceedances of the permit limitations for Outfall 001 and Outfall 002.

Transfer of treated effluent to the Applebrook Golf Course continued during mid-October. Flow was discontinued beginning October 15th and will remain off until the Spring of 2014. During October, the daily average for Outfall 002 was 135,600 gallons per day. Composite samples are collected at the influent doghouse manhole. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

SBRs 1, 3 and 4 were in service during October.

Process monitoring of each SBR included ammonia as N, nitrite as N, nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remained around the same concentration as September. Present surface area coverage during React Phase ranges from approx. 50 to 80%. The foam color remains as light to medium brown in color and averages 2 to 4 inches in depth.

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was increased at beginning of October as total phosphorus concentrations in the SBRs during September were elevated. The dosages were gradually reduced after the first week in October to a daily average of 63 gallons per day at the end of October.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 11-11-13 draft.doc

4

SBR #2 remains out of service as a treatment unit. The tank was partially filled during the storm event.

Process Monitoring On-Line Instrumentation:

Coordination with the Hach Company has been placed on hold until a demonstration unit becomes available.

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring includes pH, total alkalinity and total solids. Sludge holding tank #1 was in service. The level at the beginning of the month was 4.56 feet and the level at the end of the month was 9.77 feet. The initial total solids concentration was 0.80A% and ended the month as 0.93% total solids. 70,525 gallons of supernatant was decanted during the month. A total of 700 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank #2 was in service. The level at the beginning of the month was 10.69 feet and the level at the end of the month was 8.44 feet. The initial total solids concentration was 1.07% and ended the month as 0.72% total solids. No supernatant was decanted during the month. A total of 750 pounds of soda ash were added during the month for pH adjustment.

No significant storms were experienced during October 2013.

Minor Repairs and Preventative Maintenance

  1. On October 1, 2013, disc filter #1 failed. Troubleshooting determined a failed UPS within the control panel. Temporarily rewired disc filter controls are allowing for operations should the filter be required.
  2. On October 1, 2013, identified three (3) of four (4) actuators for the intake louver located within the SBR building blower room were not functioning as intended. Replacement of the failed actuators is recommended.
  3. On October 4, 2013, Allied Control Services (ACS) was on site to calibrate flow meters and charts.
  4. On October 4, 2013, Lenni Electric was on site and replaced the three (3) influent pump electrical service disconnects located at the influent wet well.
  5. On October 8, 2013, the replacement UPS for disc filter #1 was installed. The disc filter was returned to service.
  6. On October 14, 2013, disc filter #1 backwash cycle run times were observed to be excessive and atypical. Troubleshooting determined that the level transducer failed.
  7. On October 16, 2013, the telescopic valve for sludge tank #1 was observed to have a limited travel distance and not achieving the full travel distance of approx. 4 feet. The vendor will be contacted to investigate adjusting the telescopic valve control points to achieve the full travel distance.
  8. On October 28, 2013, the replacement level transducer for disc filter #1 was installed. The disc filter was returned to service.
  9. On October 28, 2013, the Siemens HIM Control panel date was observed to be incorrect. The HIM Date and time were updated; however, the changes were observed to have returned to an incorrect date on the following day. Gary Roberts form ICI will be contacted.
  10. During the month of October, SBR #3 decanter was observed to have risen partially or completely out of the SBR water surface. The decanter was regularly filled with a return to its desired position within the SBR basin. Paul Christensen from Siemens will be contacted to assist towards identifying conditions which would result in the decanter’s position being above the water surface.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 11-11-13 draft.doc

5

Scott provided a copy of the NPDES Compliance Inspection Report.

Adjournment

There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:40 pm.

Respectfully submitted,

Ruth Kiefer

Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 11-11-13 draft.doc

6

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-822
(f) 610-344-092
www.gawthrop.c

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
10/31/2013
Client No: 6604D

Matter Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services 220.00 500.00 0.00 -220.00 $500.00
6604-009 DE Valley Regional Finance Auth. $2,500,000 Loan 2,500.00 780.00 51.71 -2,500.00 $831.71
Total 2,720.00 1,280.00 51.71 -2,720.00 $1,331.71

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-822
(f) 610-344-092
www.gawthrop.c

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
10/31/2013
Client No: 6604-001M
Invoice No. 113959

General Authority Services

Fees

Date Timekeeper Description Hours Amount
10/11/2013 RFA Review packet for Authority meeting of 10/14/13. 0.50
10/14/2013 RFA Attend regular meeting of Authority. 2.00
For Current Services Rendered 2.50 500.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.50 $200.00 $500.00
Date Summary Amount
Previous Balance $220.00
Total Current Charges 500.00
10/17/2013 Payment -220.00
Balance Due $500.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-822
(f) 610-344-092
www.gawthrop.c

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
10/31/2013
Client No: 6604-009D
Invoice No. 113960

DE Valley Regional Finance Auth. $2,500,000 Loan

Fees

Date Timekeeper Description Hours Amount
10/15/2013 RFA Draft fifth supplemental lease between Authority and Township regarding 2013 guaranteed sewer revenue notes. 1.80 360.00
10/16/2013 RFA Review and revise fifth supplemental lease. 0.50 100.00
10/17/2013 RFA Review message from L Calhoun regarding project description for fifth amendment to lease. 0.30 60.00
10/21/2013 RFA Draft revision to fifth supplemental lease regarding project improvements. 0.40 80.00
10/22/2013 RFA Message to R Smith and K Camp regarding fifth supplemental lease between Township and Authority. 0.30 60.00
10/23/2013 RFA Review changes to fifth supplemental lease by R Smith; Message to R Smith and K Camp regarding final revisions. 0.60 120.00
For Current Services Rendered 3.90 780.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 3.90 $200.00 $780.00

Expenses

Description Amount
Federal Express Corporation - R Adams to Carmen Belefonte 51.71
Total Expenses 51.71

East Goshen Municipal Authority

Page: 2

10/31/2013

Client No: 6604-009D

Invoice No. 113960

DE Valley Regional Finance Auth. $2,500,000 Loan

Date Description Amount
Previous Balance $2,500.00
Total Current Charges 831.71
10/16/2013 Fee Payment -2,500.00
Balance Due $831.71

To ensure proper credit, please write client number on your check when returning payment. Thank You.

A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Pennoni

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

INVOICE

Newark, DE

302-655-4451 Fax: 302-654-2895

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Attention: Louis F. Smith, Twp Mgr.

Invoice #: 569529

Invoice Date: 11/18/2013

Project: EGMA1301

Project Name: 2013 General Services

For Services Rendered through: 11/3/2013

Attended October Municipal Authority meeting; and reviewed DEP's response letter regarding Applebrook GW monitoring and coordinated report submission schedule with Township.

Phase: **** -- Professional Services

Total Phase: **** -- Professional Services

Item Amount
Labor : 367.50
Expense : 0.00
Phase Total : 367.50

Amount Due This Invoice: $367.50

Billing Item Amount
Fee : 13,000.00
Prior Billings : 10,400.00
Current Billings : 367.50
Total Billings : 10,767.50

Phase: **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Senior Engineer 3.50 105.00 367.50
Labor Total: 3.50 367.50

Total Phase: **** -- Professional Services

Labor : $367.50

Expense : $0.00

Total Project : EGMA1301 -- 2013 General Services

Labor : $367.50

Expense : $0.00

RS 12/6/13

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1301 Invoice Summary

Invoice Date 11/18/2013

Field Value Date Field Date
Project : 2013 General Services
Pennoni Job No. : EGMA1301
Invoice No. : 569529
Invoice Period : 10/14/2013 to 11/03/2013
Initial Authorization : $ 10,000.00 Date : 1/9/2013
Changes : $ 3,000.00 Date :
Contract Amount : $ 13,000.00
Previously Invoiced : $ 10,400.00
Current Invoice : $ 367.50
Invoiced to Date ($) : $ 10,767.50
Invoiced to Date (%) : 82.8%
Remaining Budget ($) : $ 2,232.50
Remaining Budget (%) : 17.2%

Budget by Phase :

Item Value
Phase No. ****
Phase Name : 2013 General Services
Phase Budget : $ 13,000.00
Previousy Invoiced : $ 10,400.00
Current Invoice : $ 367.50
Invoiced to Date ($) : $ 10,767.50
Invoiced to Date (%) : 82.8%
Remaining Budget ($) : $ 2,232.50
Remaining Budget (%) : 17.2%

Comments : Prepared self-liquidating debt certification and 20-year financial projections for Authority for $2.5M borrowing in coordination w/ J. Altshul and Calhoun-Baker; prepared Engineers Report for September MA meeting; attended August and September MA meetings; coordinated Hershey Mill PS Muffin Monster start-up assistance and inspection with Township and supplier.

Pennoni

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

INVOICE

Newark, DE

302-655-4451 Fax: 302-654-2895

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Attention: Louis F. Smith, Twp Mgr.

Invoice #: 569530

Invoice Date: 11/18/2013

Project: EGMA1302

Project Name: 2013 Semi-Annual I&I Reports

For Services Rendered through: 11/3/2013

FINAL INVOICE

Finalized semi-annual I/I report.

Phase: **** -- Professional Services

Total Phase: **** -- Professional Services

Item Amount
Labor : 401.50
Expense : 0.00
Phase Total : 401.50

Amount Due This Invoice: $401.50

Billing Item Amount
Fee : 10,000.00
Prior Billings : 9,594.00
Current Billings : 401.50
Total Billings : 9,995.50

Phase: **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Graduate Engineer 5.50 73.00 401.50
Labor Total: 5.50 401.50

Total Phase: **** -- Professional Services

Labor : $401.50

Expense : $0.00

Total Project : EGMA1302 -- 2013 Semi-Annual I&I Reports

Labor : $401.50

Expense : $0.00

RS 12/6/13

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1302 Invoice Summary

Invoice Date 11/18/2013

Field Value Date Field Date
Project : 2013 Semi-Annual I&I Reports
Pennoni Job No. : EGMA1302
Invoice No. : 569530
Invoice Period : 10/14/2013 to 11/03/2013
Initial Authorization : $ 10,000.00 Date : 1/16/2013
Changes : $ - Date :
Contract Amount : $ 10,000.00
Previously Invoiced : $ 9,594.00
Current Invoice : $ 401.50
Invoiced to Date ($) : $ 9,995.50
Invoiced to Date (%) : 99.9%
Remaining Budget ($) : $ 4.50
Remaining Budget (%) : 0.1%

Budget by Phase :

Item Value
Phase No. ****
Phase Name : 2013 Semi-Annual I&I
Phase Budget : $ 10,000.00
Previousy Invoiced : $ 9,594.00
Current Invoice : $ 401.50
Invoiced to Date ($) : $ 9,995.00
Invoiced to Date (%) : 99.9%
Remaining Budget ($) : $ 4.50
Remaining Budget (%) : 0.1%

Comments : Analyzed portable meter data; obtained records of maintenance work and repairs, and began preparation of semi-annual I/I report.

Pennoni

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

INVOICE

Newark, DE

302-655-4451 Fax: 302-654-2895

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Attention: Louis F. Smith, Twp Mgr.

Invoice #: 569531

Invoice Date: 11/18/2013

Project: EGMA1306

Project Name: Reserve PS Diversion Construction P

For Services Rendered through: 11/3/2013

Performed part-time on-site construction observation of sewer installation, manhole and sewer testing, diversion of wastewater into new sewer, pump station demolition, and site restoration; prepared punchlist; and reviewed preconstruction video to confirm damage to curbing was not caused by contractor.

Phase: **** -- Professional Services

Total Phase: **** -- Professional Services

Item Amount
Labor : 3,031.25
Expense : 0.00
Phase Total : 3,031.25

Amount Due This Invoice: $3,031.25

Billing Item Amount
Fee : 20,000.00
Prior Billings : 10,498.50
Current Billings : 3,031.25
Total Billings : 13,529.75

Phase: **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Senior Engineer 5.75 105.00 603.75
Technical Specialist 29.00 75.00 2,175.00
Graduate Engineer 0.50 73.00 36.50
Engineering Technician II 3.00 72.00 216.00
Labor Total: 38.25 3,031.25

Total Phase: **** -- Professional Services

Labor : $3,031.25

Expense : $0.00

Total Project : EGMA1306 -- Reserve PS Diversion Construction P

Labor : $3,031.25

Expense : $0.00

RS 12/6/13

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1306 Invoice Summary

Invoice Date 11/18/2013

Field Value Date Field Date
Project : Reserve PS Diversion Construction
Pennoni Job No. : EGMA1306
Invoice No. : 569531
Invoice Period : 10/14/2013 to 11/03/2013
Initial Authorization : $ 20,000.00 Date : 1/16/2013
Changes : $ - Date :
Contract Amount : $ 20,000.00
Previously Invoiced : $ 10,498.50
Current Invoice : $ 3,031.25
Invoiced to Date ($) : 13,529.75
Invoiced to Date (%) : 67.6%
Remaining Budget ($) : $ 6,470.25
Remaining Budget (%) : 32.4%

Budget by Phase :

Item Value
Phase No. ****
Phase Name : Professional Services
Phase Budget : $ 20,000.00
Previousy Invoiced : $ 10,498.50
Current Invoice : $ 3,031.25
Invoiced to Date ($) : $ 13,529.75
Invoiced to Date (%) : 67.6%
Remaining Budget ($) : $ 6,470.25
Remaining Budget (%) : 32.4%

Comments : Performed part-time on-site construction observation of clearing and installation of E&S controls; performed pre-construction tasks including issuing Notice to Proceed with Construction, attending a pre-construction meeting, reviewing shop drawings, preparing survey CAD file for contractor's stakeout, and notification to County Conservation District of project start.

Pennoni

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

INVOICE

Newark, DE

302-655-4451 Fax: 302-654-2895

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Attention: Louis F. Smith, Twp Mgr.

Invoice #: 569532

Invoice Date: 11/18/2013

Project: EGMA1307

Project Name: Reservoir Rd PS Act 537 Planning

For Services Rendered through: 11/3/2013

Continued field survey of existing conditions and topography along proposed force main route on Strasburg Road; began preparation of existing conditions plan; and initiated Act 537 Plan alternatives analysis of force main routing locations & extents and gravity interceptor sewer upgrades.

Phase : 02 -- Existing Conditions Survey

Total Phase : 02 -- Existing Conditions Survey

Item Amount
Labor : 3,981.50
Expense : 0.00
Phase Total : 3,981.50

Phase : 03 -- Act 537 Plan Update

Total Phase : 03 -- Act 537 Plan Update

Item Amount
Labor : 395.00
Expense : 0.00
Phase Total : 395.00

Amount Due This Invoice $4,376.50

RS 12/6/13

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning

Invoice # : 569532

...Continued from previous page

Phase : 02 -- Existing Conditions Survey

Labor

Class Hours/Units Rate Amount
Principal Surveyor 11.50 105.00 1,207.50
Senior Survey Technician 16.00 82.00 1,312.00
Survey Technician 21.50 68.00 1,462.00
Labor Total: 49.00 3,981.50

Total Phase : 02 -- Existing Conditions Survey

Labor : $3,981.50

Expense : $0.00

Phase : 03 -- Act 537 Plan Update

Labor

Class Hours/Units Rate Amount
Senior Engineer 1.50 105.00 157.50
Project Engineer 2.50 95.00 237.50
Labor Total: 4.00 395.00

Total Phase : 03 -- Act 537 Plan Update

Labor : $395.00

Expense : $0.00

Total Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning

Labor : $4,376.50

Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.

Page: 2

East Goshen Municipal Authority

EGMA1307 Invoice Summary

Invoice Date 11/18/2013

Project : Reservoir Rd PS Act 537 Planning

Pennoni Job No. : EGMA1307

Invoice No. : 569532

Invoice Period : 10/14/2013 to 11/03/2013

Initial Authorization : $ 77,400.00 Date : 1/16/2013

Changes : $ - Date :

Contract Amount : $ 77,400.00

Previously Invoiced : $ 20,076.25

Current Invoice : $ 4,376.50

Invoiced to Date ($) : $ 22,452.75

Invoiced to Date (%) : 31.59%

Remaining Budget ($) : $ 54,947.25

Remaining Budget (%) : 68.41%

Budget by Phase :

Phase No. : ****

Phase Name : Professional Services

Phase Budget : $ 77,400.00

Previsouy Invoiced : $ 20,076.25

Current Invoice : $ 4,376.50

Invoiced to Date ($) : $ 22,452.75

Invoiced to Date (%) : 31.59%

Remaining Budget ($) : $ 54,947.25

Remaining Budget (%) : 68.41%

omments : Performed preliminary data gathering and research for wetlands delineation and field survey, and initiated preparation of Act 537 Plan report.

Drawing of the Pennoni logo: Pennoni Associates Inc. Consulting Engineers.

PENNONI ASSOCIATES INC. CONSULTING ENGINEERS

December 3, 2013

EGMA 1400

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Fee Schedule for Year 2014 and Annual Services
East Goshen Township Municipal Authority
Chester County, Pennsylvania

Dear Rick:

Pennoni Associates Inc. is proud to serve East Goshen Municipal Authority as a client, and we look forward to working with you again in 2014. We have enjoyed the challenging projects this year, and we cherish the relationships we have formed with the Authority, the Township, and the community. We respectfully request reappointment as Authority Engineer for 2014.

The proposed rates shown below for 2014 include a modest adjustment for certain classifications while other classifications remain unchanged. The rate for Authority Engineer, which was last adjusted in 2011, includes an approximately 3% increase from $110/hr to $113/hr. The rates for Senior Engineer, Staff Engineer, and Engineering Technician II, which were last adjusted in 2010, include 3% to 4% increases. These increases are: Senior Engineer from $105/hr to $108/hr, Staff Engineer from $85/hr to $88/hr, and Engineering Technician II from $72/hr to $75/hr. The Graduate Engineer rate is proposed to increase approximately 3% from $73/hr to $75/hr. The rates for Project Engineer, Associate Engineer, and Engineering Technician I remain unchanged.

While our company has many employee classifications, these are the classifications most frequently utilized in performing tasks for our municipal clients. We assign the most appropriate level staff competent to perform the work effort requested. Please note that we have added classifications for Senior Survey Technician and Survey Technician to this list for 2014, which include approximately 3% increases over rates previously billed for these classifications but which were not formally included in the rates schedule. The rate for a 2-Person Survey Crew is the sum of these two classifications at $156/hr.

ClassificationRate
Authority Engineer$113/hr
Senior Engineer$108/hr
Project Engineer$95/hr
Staff Engineer$88/hr
Associate Engineer$83/hr
Graduate Engineer$75/hr
Engineering Technician II$75/hr
Engineering Technician I$65/hr
Senior Survey Technician$86/hr
Survey Technician$70/hr

Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895

www.pennoni.com

EGMA1400
Rick Smith

December 3, 2013

Page 2
Year 2014 Annual Services

As part of our responsibilities to the Authority as the Appointed Engineer, we will provide the following professional services to the Authority:

  • Participation in monthly meetings of the Authority Board
  • Preparation of the semi-annual sewer report in March and September.
  • Continuing support in I&I reduction with sewer meter data review and periodic reports internal to the Authority.
  • Preparation of the annual Chapter 94 Municipal Waste Load Management Reports.
  • Consultation on issues on behalf of the Authority

The estimated total fee for annual services is $35,000, to be billed on an hourly basis at the above rates. We have allocated the budget as follows. The estimated fee for each activity fees has been increased by approximately 3% from the respective 2013 fee.

ActivityEstimated Fee
Monthly meetings and general consultation$10,300
Semi-annual I/I reports$10,300
Chapter 94 reports$14,400

Similar to previous years, we will establish separate accounts for each project listed above, and each project will be invoiced separately. Other projects outside of general services, as requested, will be proposed separately and at the approved rates schedule. We look forward to serving the Authority in 2014. If you have any questions, please feel free to contact me at (302) 655-4451.

Sincerely,

PENNONI ASSOCIATES INC.

Michael J. Ellis, PE
Authority Engineer

Memo

To: Municipal Authority

From: Jon Altshul

Re: 2014 Municipal Authority Proposed Budget

Date: November 18, 2013

Attached please find a proposed 2014 budget for the Municipal Authority.

Revenues

  • This budget proposes revenues of $147,471, including $124,000 from Chester Creek Tapping Fees (Goshen Meadows) & $21,444 from Ridley Creek Tapping Fees (Colonial Lane).
  • Because of the projected tapping fees, no transfer from the sewer operating fund is necessary to cover administrative expenses.
  • Interest income is projected to increase sharply as a result of the proceeds of the 2013 notes that will not be spent until 2015.

Expenses

  • Auditing expenses in 2014 are expected to increase to $10,800 to reflect additional work surrounding the sale of the 2013 DelVal notes.
  • $35,525 is budgeted for miscellaneous operating engineering services.
  • $75,000 is budgeted for engineering for the new Reservoir Road pump station project, which will be paid for from the proceeds of the 2013 bonds.

The projected fund balance at the end of 2014 is expected to be $1,632,577. The majority of this amount ($1.525 million) will represent the remaining balance of the proceeds from the 2013 notes, which will be spent on the Reservoir Road pump station construction in 2015.

I recommend that the Municipal Authority approve the proposed budget.

MUNICIPAL AUTHORITY-2014 PROPOSED BUDGET

Account TitleAcct #2013 BudgetYTD Actual through 9/30/132013 Year-End Projection2014 Proposed$ Increase 2013 Proj-2014 Prop% Increase 2013 Proj-2014 Prop
BEGINNING FUND BALANCE61,88461,88461,8841,677,433
REVENUE
INTEREST EARNINGS07341 100050242727--
INTEREST EARNED - RCSTP EXPANSION07341 10205034402,0001,9604900%
C.C. TAPPING FEES07364 1100128,000--124,000124,000
R.C.TAPPING FEES07364 11102,00013,29213,29221,4448,15261%
CONNECTION FEES - SEWER07364 1130-1,6901,690(1,690)
MISCELLANEOUS REVENUE07380 10001,000423500(500)
TRANSFER FROM SEWER OPERATING07392 0500121,69639,000126,606-(126,606)
LOAN PROCEEDS-SEWER PROJECT07392 0804992,470-2,490,000-(2,490,000)
TRANSFER FROM SEWER CAP RESERVE07392 0900829,769563,000856,801-(856,801)
TOTAL REVENUE2,075,035617,4633,488,956147,471(3,341,485)-96%
EXPENSES
ADMINISTRATIVE WAGES07424 140033,54723,94131,92132,7688473%
MISCELLANEOUS EXPENSE07424 30005,0001,5783,0004,0001,00033%
MUNIC.AUTH.-AUDITING07424 31108,8438,1008,10010,8002,70033%
ENGINEERING SERVICES07424 313035,00032,14642,86235,525(7,337)-17%
LEGAL SERVICES07424 31407,00010,66114,0007,000(7,000)-50%
MANHOLE COVER REPLACEMENTS07424 740517,000-17,000-(17,000)
C.C. CAPITAL- COLLECTION07424 7420100,000-100,000(100,000)
R.C. CAPITAL-STP07424 7440----
R.C. CAPITAL - COLLECTION07424 7450----
R.C.-CAP. PROJ.-ENGINEER07424 7451----
R.C. CAP EXPANSION GEN'L. CONTRACTOR07424 7452----
Account TitleAcct #2013 BudgetYTD Actual through 9/30/132013 Year-End Projection2014 Proposed$ Increase 2013 Proj-2014 Prop% Increase 2013 Proj-2014 Prop
R.C. CAP EXPANSION - ELECTRICAL07424 7453----
R.C. CAP EXP CONTINGENCY CAPITAL07424 7454----
R.C. CAP EXP CONTINGENCY ONGOING07424 7455----
LOCHWOOD ABANDONMENT ENGINEER07424 7475-5,5635,563(5,563)
LOCHWOOD ABANDONMENT CONSTRUCTION07424 747655,76949,79655,769(55,769)
LOCHWOOD ELIMINATION PHASE 207424 7477-12,16612,166(12,166)
MARYDELL PUMP STATION - ENGINEER07425 100031,00051,30451,304(51,304)
MARYDELL PUMP STATION -CONSTRUCTION07425 2000250,000228,317250,000(250,000)
HERSHEY MILL STATION - ENGINEER07426 100035,00025,04235,000(35,000)
HERSHEY MILL STATION - CONSTRUCTION07426 2000180,000159,763180,000(180,000)
RESERVE PUMP STATION - ENGINEER07427 100025,00019,59425,000(25,000)
RESERVE PUMP STATION - CONSTRUCTION07427 2000125,000-125,000(125,000)
RESERVOIR PUMP STATION - ENGINEER07428 1000---75,00075,000
RESERVOIR PUMP STATION - CONSTRUCTION07428 2000----
M.C.-DVRFA-DEBT SERVICE07471 100020,720-20,72022,1201,4007%
M.C.-DVRFA-INTEREST PAYMN07472 10006,003-6,0035,115(888)-15%
M.A.-R.C. INTEREST07472 10105,583---
TRANSFER TO AUTHORITY CAP FUND07492 0990992,470-890,000(890,000)-100%
TOTAL EXPENSES1,932,935627,9711,873,407192,328(1,681,079)-87%
NET RESULT FROM OPERATIONS142,100(10,508)1,615,549(44,857)
YEAR END FUND BALANCE203,98451,3761,677,4331,632,577

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 4, 2013

To: Municipal Authority

From: Mark Miller

Re: November 2013 Monthly Report

Meters: All meters were read on a daily basis. The portable flow meters are scheduled to be installed next week at their new locations as discussed with Mike Ellis.

Pump Stations: Were visited on a daily basis.

C.C. Collection: We found two significant breaks two weeks ago; one on Baldwin Drive approx 25 to 30,000 gallons per day. The other was on the Interceptor line 75 to 100,000 gallons per day. I found another one last week which could be another 15 to 20,000 gallons a day.

The break on the Interceptor turned out to be rather challenging, when we excavated the manhole and the line we found that the manhole had a significant crack that ran ¾'s of the way around the manhole. We also found that the manhole did not have an anti floater device and the manhole has actually tilted causing the 8" pipe to break.

Rick and I decided to backfill the manhole and order a new manhole and piping. Prior to backfilling we installed a sump pump and pipe to begin dewatering around the clock with a 4" diesel powered pump until the new manhole was delivered.

Once the manhole was delivered we built a dam in the Chester Creek to bypass the stream to alleviate the chance of the stream coming into our hole. While we made the repairs a 12" pump was utilized from Godwin Pump along with a 6" pump to bypass the Interceptor line. The crew did a good job replacing the manhole and piping which began at 8:00 am Wednesday and finishing up at 5:30 pm.

Prior to the work taking place Mike Ellis applied for an emergency repair permit from the DEP who came out to the site to make an inspection. Mike and I met them on site to go over the scope of work. One of the inspectors had a problem with us making a temporary road thru the wetlands. I explained it was necessary to get materials in and that we would restore the property when we were done.

I have attached pictures from beginning to the end including restoration.

While preparing Grand Oak and Bittersweet Developments for paving we noticed several holes missing sewer caps; several needed new piping, we replaced 8 caps.

R.C. Collection: We will begin grouting and raising manholes new week.

R.C. Plant: We had to pull pump #2 on the utility water system, the pump was sent to Deckmans for repairs.

Alarms: We received a total of 28 alarms in November.

PA One Calls: We received 85 PA One calls for the month of October.

Lateral Repairs: 8 cap replacements for the C.C. Collection

EGMA 1301

Drawing of the Pennoni logo.

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager

FROM: Michael Ellis, P.E.
Authority Engineer

DATE: December 5, 2013

SUBJECT: Engineer's Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Pennoni continues to provide operations assistance as needed. No issues were brought to our attention in November.

Reserve PS Elimination

  • We are awaiting several contract closeout documents from the contractor before we will recommend final payment including as-built plans, a letter from the geotechnical engineer confirming adequate backfill compaction within the detention basin berm, written notification that they will return in the spring to remove the filter sock along the creek, contractor's release, statement of surety, and maintenance bond.

Reservoir Road Pump Station Act 537 Plan

  • We completed the topographic and existing conditions field survey of the proposed pump station parcel and proposed force main route to the tentatively proposed gravity sewer connection in Bow Tree (along Strasburg Road and N. Chester Road). We are coordinating with the various utility providers to obtain copies of their utility plans. Once these plans are received, we will finalize the existing conditions plan.
  • We met with Rick Smith and Mark Miller to evaluate force main routing alternatives. The preferred approach is a variation of Alternative 2 from our November 8, 2013 alternatives memo. This alternative involves running the force main an additional approximately 3,000 l.f. to tie directly into the Ridley Creek interceptor sewer. An odor control chemical feed system would not be needed under this alternative. A cost-benefit analysis will be performed to evaluate the savings from not having an odor control system over an approx. 20 year timeframe versus the additional construction cost for a 3,000 l.f. longer force main.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2013\Memo to EGMA Board 2013-12-05.docx

EGMA 1301

  • A couple variations of the originally proposed force main route between the pump station site and Bow Tree will be evaluated. There are numerous major utility conflicts at the intersection of Strasburg Road and N. Chester Road so we are evaluating other force main routes to avoid this intersection that will not significantly increase construction cost (and may actually be less costly) via existing easements and/or rights-of-way. Additionally, we will be contacting the utility companies to determine what the restrictions would be for crossing and/or running parallel to their pipes and conduits.
  • The additional 3,000 l.f. of force main and any alternative routing from the original scope will require additional wetlands delineations and field survey.
  • We are tentatively targeting to have the utility coordination and routing determination made before the January Municipal Authority meeting.

Chester Creek Interceptor Manhole Replacement

  • We assisted the Township with scope determination and emergency permitting with PADEP for the replacement of the cracked manhole on the Chester Creek interceptor sewer. Permitting included temporary stream diversion of the East Branch Chester Creek via bypass pumping.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2013\Memo to EGMA Board 2013-12-05.docx

Logo: Big Fish Environmental Services Inc.

Monthly Operations Report: November 2013

Treatment Process Operation

During October 2013, there were no exceedances of the final effluent discharge limitations for outfall 001 and Outfall 002. Table 1 illustrates the final effluent composite sample data reported for the October 2013 eDMR.

Table 1: October 2013 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations / Sample DateFlow MGD AverageCBOD5 mg/LCBOD5 lbs/monthTSS mg/LTSS lbs/monthNH4-N mg/LNH4-N lbs/monthPhosphorus,Total, mg/LPhosphorus,Total lbs/monthFecal Coliform Geo MeanFecal Coliform Geo Mean
NPDES Permit Discharge Limitations0.7520125211317440.532001,000
Instantaneous Maximum4042
October 3, 20130.1462.32.89110.4210.510.320.3910.0000
October 7, 20130.2272.03.8240.100.190.160.3010.0000
October 17, 20130.3692.26.8260.100.310.341.0510.0000
October 22, 20130.2062.03.4120.120.200.240.4110.0000
October 29, 20130.2483.16.43.060.1470.300.340.7010.0000
Average0.23922.34.6360.1770.300.280.5710.0000
Minimum0.14602.02.8120.1000.190.160.3010.0000
Maximum0.36903.16.89110.4210.510.341.0510.0000

The monthly average total phosphorus concentration was 0.28 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.16 mg/L to 0.34 mg/L.

Flow to Applebrook, Outfall 002, continued until mid-October. Table 2 illustrates the data reported for the October 2013 eDMR.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 1 of 7

Logo: Big Fish Environmental Services Inc.

Table 2: October 2013 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations / Sample DateFlow MGD AverageCBOD5 mg/LCBOD5 lbs/monthTSS mg/LTSS lbs/monthNH4-N mg/LNH4-N lbs/monthPhosphorus,Total, mg/LPhosphorus,Total lbs/monthFecal Coliform Geo MeanFecal Coliform Geo Mean
NPDES Permit Discharge Limitations0.7520125211317440.532001,000
Instantaneous Maximum4042
October 3, 20130.14072.32.79110.4210.490.320.3810.0000
October 7, 20130.14822.02.5220.1000.120.160.2010.0000
October 17, 20130.0000No Discharge
October 22, 20130.0000
October 29, 20130.0000
Average0.05782.22.6670.2610.310.240.2910.0000
Minimum0.00002.02.5220.1000.120.160.2010.0000
Maximum0.14822.32.79110.4210.490.320.3810.0000

Table 3 illustrates the influent wastewater pollutant loadings for October 2013. The influent loadings remained within the treatment facility design loadings.

Table 3: October 2013 - Influent Wastewater

Design Basis / Sample DateFlowBOD5 mg/LBOD5 lbs/dayTSS mg/LTSS lbs/dayNH4-N mg/LNH4-N lbs/dayTKN, mg/LTKN lbs/dayPhosphorus,Total, mg/LPhosphorus,Total, lbs/day
Design BasisMGD Average3352,0983202,00132200483019.157
October 3, 20130.33713838816847224.569421184.813
October 7, 20130.46217850015042133.99547.9135617
October 17, 20130.36512033718451733.09349.31396.217
October 22, 20130.33818150915643831.38849.61396.117
October 29, 20130.33527176120858437.810657.5161.56047.922
Average0.367517849917348732.19049.31386.217
Minimum0.335212033715042124.56942.01184.813
Maximum0.462027176120858437.810657.51627.922

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 2 of 7

Logo: Big Fish Environmental Services Inc.

On October 2013, Mike Brenner, Water Quality Specialist from PA DEP was on site to conduct a facility inspection. No violations were observed.

During the month of During November 2013, there are no anticipated exceedances of the permitted effluent discharge limitations. Table 4 presents the final effluent data for the month of November 2013.

Table 4: November 2013 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations / Sample DateFlow MGD AverageCBOD5 mg/LCBOD5 lbs/monthTSS mg/LTSS lbs/monthNH4-N mg/LNH4-N lbs/monthPhosphorus,Total, mg/LPhosphorus,Total lbs/monthFecal Coliform Geo MeanFecal Coliform Geo Mean
NPDES Permit Discharge Limitations0.7520125211317440.532001,000
Instantaneous Maximum4042
November 5, 20130.3532.05.9390.1200.350.310.9110.0000
November 12, 20130.3182.66.95130.100.270.340.9010.0000
November 19, 20130.3952.06.63100.1760.580.250.8210.0000
November 26, 20130.40310.0000
Average0.36732.26.54110.1320.400.300.8810.0000
Minimum0.31802.05.9390.1000.270.250.8210.0000
Maximum0.40302.66.95130.1760.580.340.9110.0000

During November, there was no discharge to Applebrook.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 3 of 7

Logo: Big Fish Environmental Services Inc.

Table 6: November 2013 - Influent Wastewater

Design Basis / Sample DateFlowBOD5 mg/LBOD5 lbs/dayTSS mg/LTSS lbs/dayNH4-N mg/LNH4-N lbs/dayTKN, mg/LTKN lbs/dayPhosphorus,Total, mg/LPhosphorus,Total, lbs/day
Design BasisMGD Average3352,0983202,00132200483019.157
November 5, 20130.34413438530687829.48459.1170720
November 12, 20130.30019556016848225.87441.21184.613
November 19, 20130.32120458524269430.4876.920
November 26, 20130.465294844
Average0.357517851025372528.58250.21446.218
Minimum0.300313438516848225.87441.21184.613
Maximum0.464620458530687830.48759.11707.020

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of November. SBR number 2 was periodically placed in service during the week of November 25th to assist with managing influent flows when SBR number 3 effluent valve actuator was malfunctioning.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remained around the same concentration as during October. Present surface area coverage during React Phase ranges from approximately 60 to 80%. The foam color remains as light to medium brown in color and averages 2 to 4 inches in depth

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was decreased at during November. The addition of soda ash to the SBRs to assist

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 4 of 7

Logo: Big Fish Environmental Services Inc.

with maintain desired pH concentrations above 7.0 standard units continued during the month.

SBR No. 2 remains out of service as a treatment unit.

During the month, the decanter for SBR 3 was observed to have been extended above the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The frequency of occurrence ranged from one to several occurrences during the month. If an effluent nozzle is partiality or completely opened at all times, the entry of air within the decanter could occur resulting with the decanter extending above the water level. The SBR is planned to be removed from service during mid-December for inspection of the effluent decanter nozzles.

Process Monitoring On-Line Instrumentation:

Representatives from the Hach Company will be on site on December 17, 2013 at 9:00 AM to discuss the proposed pilot study of the RTC online analyzer.

Flow data:

November 2013
Flow Meter LocationTotal Volume for Month, MGDAverage Daily Flow, gpd
Influent Wastewater to Screening Building10.828360,938
Influent Wastewater to SBRs11.927397,552
Internal Recycle1.09836,614
Treated Effluent to Disc Filters11.212373,995
Final Effluent Discharge10.956365,210
Applebrook Golf Course00

Chemical Usage:

November 2013
ChemicalDaily AverageTotal Monthly
Soda Ash3289,850
Magnesium Hydroxide0 gpd0 gallons
Aluminum Sulfate solution63.41,902
Polymer (centrifuge)9*126 gallons

*Fourteen (14) days of centrifuge operation

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 5 of 7

Logo: Big Fish Environmental Services Inc.

Solids Dewatering and Disposal: November 2013

Sludge Dewatering Summary
ItemAmount
Gallons of sludge dewatered239,579 gallons
Average Dewatered Total Solids, %NA+
Wet TonsNA+
Dry TonsNA+
Number of dumpsters4*

*A total of four (4) dumpsters were filled during November, however, only three (3) were removed offsite during November. The further dumpster was removed off site on December 2, 2013.

+The solids handling data from the laboratory was unavailable at the time of preparing this report.

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of the month was 9.82 feet and the level at the end of the month was 6.73 feet. The initial total solids concentration were 0.92% and ended the month as 0.63% total solids. Zero gallons of supernatant were decanted during the month. A total of 400 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 9.28 feet and the level at the end of the month was 10.15 feet. The initial total solids concentration were 0.79% and ended the month as 0.86% total solids. A total of 91,875 gallons of supernatant were decanted during the month. A total of 650 pounds of soda ash were added during the month for pH adjustment.

Significant Storm Events

No significant storms were experienced during the month of November 2013.

Minor Repairs and Preventative Maintenance

  • On November 9, 2013, the utility water system was removed to service. Identified no power to control panel. When power was applied, the control panel immediately tripped off. Mark Miller arranged for Lenni Electric to correct the problem.
  • On November 9, 2013, replaced the sensor caps for LDO probes in SDBRs 1, 3, and 4. Calibrated LDO meters.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 6 of 7

Logo: Big Fish Environmental Services Inc.

  • On November 18, 2013, Lenni Electric on site to repair the utility water electric failure. The utility water system was returned to service with on pump online.
  • On November 19, 2013, responded to Siemens panel alarm, checked home computer SBR # 3 effluent valve failed to open. Placed SBR 2 on line during troubleshooting and implementation of corrective actions. Valve return to intended operational mode.
  • On November 21, 2013, responded to Siemens panel alarm for SBR 3 effluent valve failed to close. Adjusted valve and returned valve appeared to operation.
  • On November 25, 2013, responded to Siemens panel alarm for SBR 4 maximum decant alarm.
  • On November 27, 2013, respond to Siemens panel alarm for SBR 3 effluent valve failed to open. Valve failed to open or close through manual operation. Adjusted valve and confirm operation on hand mode. Remained on site to observe valve operate in automatic mode. Valve was observed to be functioning as intended.
  • On November 29, 2013, SBR 3 valve failed to open. SBR 2 placed on line. Contacted Tri-State to arrange for a Technician to report to the facility to assist with repairing the actuator. Tri-State repaired the valve. During the visit, the motor for SBR 2 effluent actuator was determined to require replacement (SBR 2 actuator was previously the actuator from SBR 3)

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 7 of 7

Memo

To: Municipal Authority

From: Jon Altshul

Re: MA November Financial Reports

Date: December 5, 2013

The Municipal Authority recorded $40,337 in revenues and $61,114 in expenses in November, a difference of -$20,778 (rounded). The fund balance is now $1,635,119.

$39,686 of the expenses were related to the Reserve Pump Station and an additional $18,057 were engineering costs associated with the Reservoir Road Pump Station. Most of the revenue came from a $40,000 transfer from the sewer sinking fund.

Note that the beginning fund balance was revised downwards by $12 from what was reported to you as the ending fund balance last month. This was due to a $12 incoming wire fee assessed by Susquehanna Bank on the proceeds of the DelVal note that was not recorded until last month.

A complete list of all monthly expenses is provided.

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
November 2013

Account TitleAcct #Annual BudgetMonth To Date ActualYear To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE1,655,896.70 ***
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION07341 102050.00135.06270.14
GRANT REVENUE07392 08000.000.000.00
TOTAL REVENUE50.00135.06270.14
EXPENSES
R.C.-CAP. PROJ.-ENGINEER07424 74510.000.000.00
R.C. CAP EXPANSION GEN'L CONTRACTOR07424 74520.000.000.00
R.C. CAP EXPANSION - ELECTRICAL07424 74530.000.000.00
R.C. CAP EXP CONTINGENCY CAPITAL07424 74540.000.000.00
R.C. CAP EXP CONTINGENCY ONGOING07424 74550.000.000.00
R.C. CAP EXP ADDITIONAL CONTINGENCY07424 74560.000.000.00
TRANSFER TO SEWER SINKING FUND07492 05500.000.00877,000.00
TRANSFER TO AUTHORITY CAP FUND07492 0990992,470.000.000.00
TOTAL EXPENSES992,470.000.00877,000.00
RCSTP NET RESULT(992,420.00)135.06(876,729.86)

U:\bmccool\2013\Municipal Authority\2013 - 11 - Municipal Authority Report.xlsx

Page 1 of 3

12/05/2013

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
November 2013

Account TitleAcct #Annual BudgetMonth To Date ActualYear To Date Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS07341 100050.001.5826.63
C.C. TAPPING FEES07364 1100128,000.00200.00200.00
R.C.TAPPING FEES07364 11102,000.000.0013,292.00
CONNECTION FEES - SEWER07364 11300.000.001,689.64
MISCELLANEOUS REVENUE07380 10001,000.000.00423.36
TRANSFER FROM SEWER OPERATING07392 0500121,696.000.0065,000.00
TOTAL REVENUE252,746.00201.5880,631.63
EXPENSES
ADMINISTRATIVE WAGES07424 140033,547.000.0023,941.08
MISCELLANEOUS EXPENSE07424 30005,000.000.001,690.13
MUNIC.AUTH.-AUDITING07424 31108,843.000.008,100.00
ENGINEERING SERVICES07424 313035,000.002,039.5037,306.25
LEGAL SERVICES07424 31407,000.001,331.7112,212.73
M.C.-DVRFA-DEBT SERVICE07471 100020,720.000.000.00
M.C.-DVRFA-INTEREST PAYMN07472 10006,003.000.000.00
M.C.-DVRFA-INTEREST PAYMN07472 10105,583.000.000.00
TOTAL EXPENSES121,696.003,371.2183,250.19
OPERATING NET RESULT131,050.00(3,169.63)(2,618.56)

U:\bmccool\2013\Municipal Authority\2013 - 11 - Municipal Authority Report.xlsx

Page 2 of 3

12/05/2013

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
November 2013

Account TitleAcct #Annual BudgetMonth To Date ActualYear To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT07393 1001992,470.000.002,477,000.00
TRANSFER FROM SEWER CAP RESERVE07392.0900829,769.0040,000.00662,000.00
TOTAL REVENUE1,822,239.0040,000.003,139,000.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER07425 100031,000.000.0051,303.74
MARYDELL PUMP STATION -CONSTRUCTION07425 2000250,000.000.00228,317.41
MANHOLE COVER REPLACEMENTS07424.740517,000.000.000.00
C.C. CAPITAL - COLLECTION07424.7420100,000.000.000.00
LOCHWOOD ABANDONMENT ENGINEER07424 74750.000.005,562.75
LOCHWOOD ABANDONMENT CONSTRUCTION07424 747655,769.000.0049,796.16
LOCHWOOD ELIMINATION PHASE 207424 74770.000.0012,165.62
HERSHEY MILL STATION - ENGINEER07426 100035,000.000.0025,349.99
HERSHEY MILL STATION - CONSTRUCTION07426 2000180,000.000.00167,012.62
RESERVE PUMP STATION - ENGINEER07427 100025,000.007,597.7530,092.51
RESERVE PUMP STATION - CONSTRUCTION07427 2000125,000.0032,088.7196,739.78
RESERVOIR PUMP STATION - ENGINEER07428 10000.0018,056.5020,076.25
RESERVOIR PUMP STATION CONSTRUCTION07428 20000.000.000.00
TOTAL EXPENSES818,769.0057,742.96686,416.83
CAPITAL NET RESULT1,003,470.00(17,742.96)2,452,583.17
MUNICIPAL AUTHORITY ENDING FUND BALANCE1,635,119.17

***The beginning fund balance is $12 less than the October ending fund balance due to a $12.00 bank fee recorded on 11/13

U:\bmccool\2013\Municipal Authority\2013 - 11 - Municipal Authority Report.xlsx

Page 3 of 3

12/05/2013

East Goshen Township General Ledger

Report Date 12/05/13 | GL Transaction Details | PAGE 1
MGRP18 run by BRIAN | 8 : 36 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 0.00 INTEREST EARNINGS
1301 JE 36010 0.74 02/05/13 INTEREST INTEREST EARNED JANUARY 2013 07 FUND
0.00 0.74 -0.74
1302 36396 0.48 03/04/13 INTEREST INTEREST EARNED FEB. 2013 07 FUND
0.00 0.48 -1.22
1303 36759 0.92 04/02/13 INTEREST INTEREST EARNED MARCH 2013 07 FUND
0.00 0.92 -2.14
1304 37177 3.20 05/01/13 INTEREST INTEREST EARNED APRIL 2013 07100.1000
37178 5.60 05/01/13 INTEREST INTEREST EARNED APRIL 2013 07 CONTRUCTION FUND
0.00 8.80 -10.94
1305 37710 1.52 06/04/13 INTEREST INTEREST EARNED MAY 2013 07 FUND
0.00 1.52 -12.46
1306 38150 5.24 07/02/13 INTEREST INTEREST EARNED JUNE 2013 07 FUND
0.00 5.24 -17.70
1307 38593 2.15 08/02/13 INTEREST INTEREST EARNED JULY 2013 07100.1000
0.00 2.15 -19.85
1308 39012 2.30 09/03/13 INTEREST INTEREST EARNED AUGUST 2013 07100.1000
0.00 2.30 -22.15
1309 39401 1.52 10/01/13 INTEREST INTEREST EARNED SEPTEMBER 2013 07100.1000
0.00 1.52 -23.67
1310 39804 1.38 11/01/13 INTEREST INTEREST EARNED OCTOBER 2013 07 FUND
0.00 1.38 -25.05
1311 40135 1.58 12/02/13 INTEREST INTEREST EARNED NOVEMBER 2013 7100.1000
0.00 1.58 -26.63
0.00 26.63 -26.63

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 2

MGRP18 run by BRIAN 8 : 37 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07341-1020 INTEREST EARNED - RCSTP EXPANSION0.00
1301360113.9702/05/13INTERESTINTEREST EARNED JANUARY 2013 07 CONSTRUCTION FUND
0.003.97-3.97
1302363974.9103/04/13INTERESTINTEREST EARNED FEB.2013 07 CONSTRUCTION FUND
0.004.91-8.88
1303367603.9704/02/13INTERESTINTEREST EARNED MARCH 2013 07 CONSTRUCTION FUND
0.003.97-12.85
13053771122.2606/04/13INTERESTINTEREST EARNED MAY 2013 07 CONSTRUCTION FUND
0.0022.26-35.11
13063795317.8806/20/13ADJUSTMENTADJUSTMENT TO MAY 2013 INTEREST
381513.9607/02/13INTERESTINTEREST EARNED JUNE 2013 07 CONSTRUCTION FUND
17.883.96-21.19
1307385944.6608/02/13INTERESTINTEREST EARNED JULY 2013 07 CONSTRUCTION FUND
0.004.66-25.85
1308390134.2509/03/13INTERESTINTEREST EARNED AUGUST 2013 07 CONSTRUCTION FUND
0.004.25-30.10
1309394024.3710/01/13INTERESTINTEREST EARNED SEPTEMBER 2013 07 CONSTRUCTION FUND
0.004.37-34.47
131039805100.6111/01/13INTERESTINTEREST EARNED OCTOBER 2013 07 CONTSTRUCTION FUND
0.00100.61-135.08
131140136135.0612/02/13INTERESTINTEREST EARNED NOVEMBER 2013 07 CONSTRUCTION FUND
0.00135.06-270.14
17.88288.02-270.14
07364-1100 C.C. TAPPING FEES0.00
1305CR376103,600.003,600.0005/29/1394 2245181 CHESTER SPRINGS DEVELOPMENT CO
3,600.003,600.000.00

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 3

MGRP18 run by BRIAN 8 : 37 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07364-11001311CR39954200.0011/14/13315879431 1637 MANLEY RD - O'NEILL
0.00200.00-200.00
3,600.003,800.00-200.00
07364-1110 R.C.TAPPING FEES0.00
1301JE359312,000.0001/30/13REV TRXREVERSE TRX #32779 TAP IN FEE FOR 913 SORRELL HILL
359342,000.0001/30/13REV TRXRE-REVERSE TRX 35931 FOR 913 SORRELL HILL TAP IN FEES
2,000.002,000.000.00
1303RE364302,000.0003/05/13364301TAP IN FEE - 916 SORRELL HILL
364312,000.0003/05/13364311TAP IN FEE - 911 SORRELL HILL
0.004,000.00-4,000.00
1305375627,148.0005/23/13375621TAP IN FEE FOR 1598 WINEBERRY
0.007,148.00-11,148.00
1309CR393732,144.0009/30/13101378751 SUNNY RIDGE FARMS LLC
0.002,144.00-13,292.00
2,000.0015,292.00-13,292.00
07364-1130 CONNECTION FEES - SEWER0.00
130236075423.0002/08/1326471951 JACOBS, ROBERT & CHERYL
423.0002/08/1375571931 GEORGE SMITH & CHRISTINA CONLE
***0.00846.00 ***
36147423.0002/13/131165771 PAPPANO, JOSEPH & PATRICIA
421.0002/13/131171961 PAPPANO, JOSEPH & PATRICIA
***0.00844.00 ***
36193423.0002/15/13217371941 STOFFLET, MICHAEL
JE36174282.2402/14/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
36194141.1202/15/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
423.362,113.00-1,689.64
423.362,113.00-1,689.64
07380-1000 MISCELLANEOUS REVENUE0.00
36174282.2402/14/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
36194141.1202/15/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
0.00423.36-423.36
0.00423.36-423.36
07392-0500 TRANSFER FROM SEWER OPERATING0.00

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 4

MGRP18 run by BRIAN 8 : 37 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
1305JE3736639,000.0005/14/13DEPOSITDEPOSIT FUNDS FROM SEWER TO MA TO COVER OPERATING EXPENSE
0.0039,000.00-39,000.00
13103960126,000.0010/16/13DEPOSITDEPOSIT INTO MA ACCT. FROM 05
0.0026,000.00-65,000.00
0.0065,000.00-65,000.00
07392-0900 TRANSFER FROM SEWER CAP RESERVE0.00
13023618730,000.0002/15/13XFERXFER $ FROM 9100.1000 TO 7100. 1000 TO COVER MA EXPENSES
0.0030,000.00-30,000.00
13043684150,000.0004/08/13XFERXFER $ FROM 9100.1000 TO 7100.1000
3690560,000.0004/11/13XFERXFER $ FROM 9100.1000 TO 7100.1000
0.00110,000.00-140,000.00
13053736153,000.0005/14/13XFERXFER FUNDS FROM 9100.1000 TO 7100.1000 TO COVER CAP.EXP.
0.0053,000.00-193,000.00
130637789250,000.0006/10/13DEPOSITDEPOSIT TO MUN.AUTHORITY ACCT. 7100.1000
0.00250,000.00-443,000.00
13073815850,000.0007/02/13XFERXFER $ TO COVER MUN.AUTHORITY CAPITAL EXPENSES
0.0050,000.00-493,000.00
13083871570,000.0008/13/13XFERXFER FROM SEWER CAPITAL RES. TO MUNICIPAL AUTHORITY
0.0070,000.00-563,000.00
13103957534,000.0010/15/13XFERXFER $ FROM 09 TO 07 TO COVER MA CAPITAL EXPENSES
3960125,000.0010/16/13DEPOSITDEPOSIT INTO MA ACCT. FROM 05
0.0059,000.00-622,000.00
13113997340,000.0011/15/13XFERXFER FUNDS FROM SEWER SINKING FUND TO MA GENERAL 11/15
0.0040,000.00-662,000.00
0.00662,000.00-662,000.00

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 5

MGRP18 run by BRIAN 8 : 37 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07393-1001 LOAN PROCEEDS-SEWER PROJECT0.00
1310RE397022,477,000.0010/24/133970212013 DELVAL PROCEEDS
0.002,477,000.00%-2477000.00
0.002,477,000.00%-2477000.00
07424-1400 ADMINISTRATIVE WAGES0.00
1303CD367117,980.3603/28/132166425EAST GOSHEN TOWNSHIP 1ST QTR.2013 REIMBURSMNT TO GENE FUND
7,980.360.007,980.36
1306380677,980.3606/27/132189425EAST GOSHEN TOWNSHIP 2ND QTR. 2013 REIMBURSEMENT TO GENERAL FUND
7,980.360.0015,960.72
1309393427,980.3609/26/132210425EAST GOSHEN TOWNSHIP - GENERAL 3RD QTR. 2013 REIMBURSMNT TO GEN FUND
7,980.360.0023,941.08
23,941.080.0023,941.08
07424-3000 MISCELLANEOUS EXPENSE0.00
130135598500.0001/03/1321532737DEP - COMMONWEALTH OF PA NPDES PERMIT - 2013 MINOR SEWAGE FACILITY
35783950.0001/18/1321582132PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2013 ACTIVE MEMBERSHIP DUES
1,450.000.001,450.00
130939089128.1309/10/1322083110COMMONWEALTH OF PENNSYLVANIA APPLICATION FEE TO DCED - MUNICI AUTHORITY DEBT ISSUANCE ($2.5M)
128.130.001,578.13
131039630100.0010/17/132214425EAST GOSHEN TOWNSHIP - GENERAL REIMBURSE GEN.FUND FOR CREDIT CA PURCHASE FOR MA EXPENSES
JE3991812.0011/13/13BANK FEEWIRE FEE 10/15/13
112.000.001,690.13
1,690.130.001,690.13
07424-3110 MUNIC.AUTH.-AUDITING0.00
1307CD382728,100.0007/12/132195808MAILLIE FALCONIERO & CO. EXAM.OF MA FINANCIAL STMTS. - 20

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 6

MGRP18 run by BRIAN 8 : 37 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
8,100.000.008,100.00
8,100.000.008,100.00
07424-3130 ENGINEERING SERVICES0.00
1301356953,264.7501/15/1321561052PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 2012 GEN.SERV
3,264.750.003,264.75
1302361191,538.7502/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 GEN.SERVICES 2
1,538.750.004,803.50
1304368896,695.2504/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 GENERAL SE
368905,560.7504/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 GENERAL SER
12,256.000.0017,059.50
1305373578,215.2505/14/1321751052PENNONI ASSOCIATES INC. SERV.THRU 4/14/13 GENERAL SERVIC
8,215.250.0025,274.75
130637787795.2506/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 2013 GENER
795.250.0026,070.00
1307381223,072.2507/02/1321921052PENNONI ASSOCIATES INC. SERVICES THRU 6/16/13 GENERAL SE
3,072.250.0029,142.25
1308387611,843.7508/15/1322051052PENNONI ASSOCIATES INC. GENERAL SERVICES
1,843.750.0030,986.00
1309391321,160.2509/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 2013 GENERA SERVICES
1,160.250.0032,146.25
1310395623,120.5010/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/15/13 2013 SEMI-ANN I&I REPORTS
3,120.500.0035,266.75
1311399332,039.5011/13/1322171052PENNONI ASSOCIATES INC. SERVICE THRU 10/13/13 - GEN.SERV
2,039.500.0037,306.25

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 7

MGRP18 run by BRIAN 8 : 37 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
37,306.250.0037,306.25
07424-3140 LEGAL SERVICES0.00
1301356953,289.1001/15/132155528GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 11/9-11/30/12 GEN.AU
3,289.100.003,289.10
1302361191,406.8002/12/132161528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN. 2013 GEN.AU
1,406.800.004,695.90
1304368891,661.1204/10/132170528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 2/4-2/25/13 GEN.A
1,661.120.006,357.02
1305373573,364.0005/14/132174528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 3/7-3/25/13 GEN.A
3,364.000.009,721.02
130738122700.0007/02/132191528GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 5/13-5/29/13 GEN.AUT
700.000.0010,421.02
130838761240.0008/15/132204528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 6/21-6/26/13
240.000.0010,661.02
131039562220.0010/15/132211528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 9/9/13 GEN.AUTHOR
220.000.0010,881.02
131139933500.0011/13/132216528GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 10/11-10/14/13 GEN.A
JE40079831.7111/25/13RECLASSRECLASS GAWTHROP INV.113960 PAYMENT
1,331.710.0012,212.73
12,212.730.0012,212.73
07424-7475 LOCHWOOD ABANDONMENT ENGINEER0.00
1301CD35695511.5001/15/1321561052PENNONI ASSOCIATES INC. SERVICES THRU 12/9/12 HERSHEY M PUMP STATION MUFFIN MONSTER
511.500.00511.50
130236119574.5002/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 H.MILL PS MUF MONSTER DESIGN

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 8

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
574.500.001,086.00
13053735747.5005/14/1321751052PENNONI ASSOCIATES INC. SERV.THRU 4/14/13 H.MILL PS MUFF MONSTER'
47.500.001,133.50
1306377874,429.2506/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 H.M.PS DIV CONSTRUCTION
4,429.250.005,562.75
5,562.750.005,562.75
07424-7476 LOCHWOOD ABANDONMENT CONSTRUCTION0.00
130135598246.0101/03/132152317CONTRACTOR'S CHOICE ORANGE SAFETY FENCE, STAKES & PA
356951,482.4001/15/132154425EAST GOSHEN TOWNSHIP LOCHWOOD PLANT CLOSING COSTS-LAB
35698-1,482.4001/15/132154425EAST GOSHEN TOWNSHIP VOID CK. 2154 - DUPLICATE PAYMEN
246.010.00246.01
13043684030,769.0004/08/1321692128JWC ENVIRONMENTAL CONTROLLER ASSEMBLY, HPP, & REP SUPPLIED EQUIPMENT
30,769.000.0031,015.01
130537649424.0005/31/132180489FISHER & SON COMPANY INC 4 50LB BAGS - COMMERCIAL SEED
111.6505/31/132181739KNOX EQUIPMENT COMPANY MULCHER RENTAL 5/16-5/17/13
5,560.0005/31/132182800MACANGA INC. TRUCKS & TRACK HOE USE - HAUL DI FROM WESTTOWN WAY 5/13 & 5/14/13
8,010.7505/31/1321831876RANSOME RENTAL COMPANY LP STANDARD TRACK RENTAL 5/13-5/20/
***14,106.400.00 ***
14,106.400.0045,121.41
13063777199.7506/07/1321841849HICKS BROTHERS LLC 21 SMALL BALES STRAW
38067525.0006/27/1321881556CONVERY, MATTHEW GPS - RIDLEY CREEK LINE - LOCHWO CHASE AND OPEN SPACE
624.750.0045,746.16
1308386654,050.0008/09/1321981556CONVERY, MATTHEW GPS OF R.C. SEWER LINE- 6/24 & 6

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 9

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
4,050.000.0049,796.16
1310396307,250.0010/17/1322153136MGK INDUSTRIES INC. INSTALLATION OF GRINDER FRAME AT HERSHEY MILL PUMP STATION
JE398147,250.0011/04/13RECLASSRECLASS PAYMENT FOR GRINDER PUMP.
7,250.007,250.0049,796.16
57,046.167,250.0049,796.16
07424-7477 LOCHWOOD ELIMINATION PHASE 20.00
1301CD35872379.9001/24/1321592762A.J. BLOSENSKI INC. 30 YDS. ROLLOFF HAULING & LANDFI FEE
379.900.00379.90
130236189200.0002/15/1321652762A.J. BLOSENSKI INC. 30 YARD ROLLOFF HAULING FEE
JE36105379.9002/11/13VOID CHECKVOID CK. 2159 - OVERCHARGED BY VENDOR - RETURNED CHECK
200.00379.90200.00
1303CD367111,894.9103/28/132167425EAST GOSHEN TOWNSHIP 1/1-3/27/13 REIMBURSE GENERAL FU FOR LOCHWOOD PLANT CLOSING LABOR
1,894.910.002,094.91
13063806710,070.7106/27/132190425EAST GOSHEN TOWNSHIP 2ND QTR.2013 REIMBURSMT TO GENER RE: LOCHWOOD PLANT CLOSING LABOR
10,070.710.0012,165.62
12,545.52379.9012,165.62
07425-1000 MARYDELL PUMP STATION - ENGINEER0.00
1301356955,493.7501/15/1321561052PENNONI ASSOCIATES INC. SERVICES THRU 12/9/12 MARYDELL
5,493.750.005,493.75
1302361195,988.7502/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 MARYDELL PS
5,988.750.0011,482.50
1304368896,863.0004/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 MARYDELL P
368902,167.7504/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 MARYDELL

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 10

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
9,030.750.0020,513.25
1305373577,168.0005/14/1321751052PENNONI ASSOCIATES INC. SERV. THRU 4/14/13 MARYDELL PS
375484,089.2105/22/1321783084PA DEPARTMENT OF TRANSPORTATION MARY DELL DIVERSION INSPECTION
11,257.210.0031,770.46
1306377877,301.0006/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 MARYDELL P DIVERSION
7,301.000.0039,071.46
1307381225,803.5007/02/1321921052PENNONI ASSOCIATES INC. SERV.THRU 6/16/13 MARYDELL PS DI
5,803.500.0044,874.96
1308387611,653.7508/15/1322051052PENNONI ASSOCIATES INC. MARYDELL PS
388813,671.0008/23/1322063084PA DEPARTMENT OF TRANSPORTATION HIGHWY OCCUPANCY PERMITS - MARYD DIVERSION
5,324.750.0050,199.71
130939088235.2809/10/1322073084PA DEPARTMENT OF TRANSPORTATION HWY OCCUPANCY PERMITS - MARY DEL DIVERSION
39132868.7509/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 MARYDELL PS DIVERSION
1,104.030.0051,303.74
51,303.740.0051,303.74
07425-2000 MARYDELL PUMP STATION -CONSTRUCTION0.00
1304367462,351.3504/01/1321683050PECO ENERGY TWO MAN PECO CREW- BRACE PECO PO
3688920,700.0004/10/1321723059PLY-MAR CONSTRUCTION CO.INC. MARYDELL PUMP STATION DIVERSION
23,051.350.0023,051.35
13053735779,704.0005/14/1321763059PLY-MAR CONSTRUCTION CO.INC. APP.#2 MARYDELL PS DIVERSION
79,704.000.00102,755.35
13063778750,608.0006/10/1321873059PLY-MAR CONSTRUCTION CO.INC. MARYDELL PS DIVERSION APP.3
50,608.000.00153,363.35

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 11

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07425-20001307CD3812231,620.7507/02/1321933059PLY-MAR CONSTRUCTION CO.INC. MARYDELL DIVERSION - APP.#4
38181220.0007/03/132194765LENNI ELECTRIC CORPORATION MARYDELL STATION FEED
31,840.750.00185,204.10
1308385711,980.0008/01/1321971022PATTERSON, MICHAEL J. WOOD STOCKADE FENCE INSTALLATION
3874641,133.3108/15/1321993059PLY-MAR CONSTRUCTION CO.INC. MARYDELL PUMP STATION DIVERSION
43,113.310.00228,317.41
228,317.410.00228,317.41
07426-1000 HERSHEY MILL STATION - ENGINEER0.00
1301356952,047.1201/15/1321561052PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 HERSHEY MILL
35783250.0001/18/132157263CHESTER COUNTY CONSERVATION DISTRICT PERMIT FEE - HERSHEY MILL DAM
2,297.120.002,297.12
1302361192,600.0002/12/1321602911EARTHCORE SERVICES LLC MOBILIZATION ATV RIG-HMPS DIVERS
2,932.6202/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 HERSHEY MILL
***5,532.620.00 ***
5,532.620.007,829.74
1304368893,593.7504/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 HERSHEY MI
368902,516.5004/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 HRSHEY MILL
6,110.250.0013,939.99
1305373571,539.7505/14/1321751052PENNONI ASSOCIATES INC. SERV. THRU 4/14/13 HERSHEY MILL
1,539.750.0015,479.74
1307381227,301.5007/02/1321921052PENNONI ASSOCIATES INC. SERV. THRU 6/16/13 HERSHEY MILL
7,301.500.0022,781.24
1308387611,653.7508/15/1322051052PENNONI ASSOCIATES INC. HERSHEY MILL PS
1,653.750.0024,434.99
130939132607.5009/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 2013 HERS.M PS DIV. CONSTRUCTION

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 12

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
607.500.0025,042.49
131039562307.5010/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/22/13 HERSHEY MILL
307.500.0025,349.99
25,349.990.0025,349.99
07426-2000 HERSHEY MILL STATION - CONSTRUCTION0.00
130637787135,130.4906/10/1321853092DELAWARE VALLEY UTILITY CONTRACTORS INC. HERSHEY MILL PROJ. APPLICATION 1
135,130.490.00135,130.49
1307384022,535.0007/19/132196425EAST GOSHEN TOWNSHIP - GENERAL REIMBURSE GEN. FUND FOR MA CREDI CARD PURCHASE - HERSHEY MILL
2,535.000.00137,665.49
13083876122,097.1308/15/1322033092DELAWARE VALLEY UTILITY CONTRACTORS INC. HERSHEY MILL PROJ. APPLICATION 2
22,097.130.00159,762.62
1310JE398147,250.0011/04/13RECLASSRECLASS PAYMENT FOR GRINDER PUMP.
7,250.000.00167,012.62
167,012.620.00167,012.62
07427-1000 RESERVE PUMP STATION - ENGINEER0.00
1301CD356952,047.1301/15/1321561052PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 RESERVE PS
2,047.130.002,047.13
1302361192,932.6302/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 RESERVE PS
1,000.0002/12/1321633027SCHRODER, JOHN SEWER RIGHT OF WAY
1,000.0002/12/1321643029WILLOW POND HOMEOWNERS ASSOCIATION SEWER RIGHT OF WAY
***4,932.630.00 ***
4,932.630.006,979.76
1304368891,013.2504/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 RESERVE PU
368902,516.5004/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 RESERVE PS
3,529.750.0010,509.51

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 13

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07427-10001305CD37357563.2505/14/1321751052PENNONI ASSOCIATES INC. SERV. THRU 4/14/13 RESERVE PS
1,455.0005/14/1321773075SPRING MEADOWS HOMEOWNERS ASSOCIATION SEWER RIGHT OF WAY
***2,018.250.00 ***
376492,600.0005/31/1321792911EARTHCORE SERVICES LLC ATV RIG PROBES - 1 DAY
4,618.250.0015,127.76
130637787427.5006/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 - RESERVE P
427.500.0015,555.26
1307381222,770.7507/02/1321921052PENNONI ASSOCIATES INC. SERVICES THRU 6/16/13 RESERVE PS
2,770.750.0018,326.01
130838761714.2508/15/1322051052PENNONI ASSOCIATES INC. RESERVE PS
714.250.0019,040.26
130939132553.7509/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 2013 HERS.M & RESERVE PS.
553.750.0019,594.01
1310395622,900.7510/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/15/13 RESERVE PS DI
2,900.750.0022,494.76
1311399327,597.7511/13/13100061052PENNONI ASSOCIATES INC. SERVICES THRU 10/13/13 - RESERVE DIVERSION CONSTRUCTION
39945-7,597.7511/14/13100061052PENNONI ASSOCIATES INC. VOID CK. 010006
399477,597.7511/14/1322181052PENNONI ASSOCIATES INC. SERV.THRU 10/13/13 - RESERVE PS
7,597.750.0030,092.51
30,092.510.0030,092.51
07427-2000 RESERVE PUMP STATION - CONSTRUCTION0.00
13103956264,651.0710/15/1322133133SMITH INC., RONALD APPLIC.#1 RESERVE PS SEWER DIVE
64,651.070.0064,651.07
13113993232,088.7111/13/13100073133SMITH INC., RONALD APPLICATION #2 RESERVE PS
39945-32,088.7111/14/13100073133SMITH INC., RONALD VOID #010007

East Goshen Township General Ledger

Report Date 12/05/13

GL Transaction Details

PAGE 14

MGRP18 run by BRIAN 8 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07427-20001311CD3994732,088.7111/14/1322193133SMITH INC., RONALD RESERVE PS - APP.#2
32,088.710.0096,739.78
96,739.780.0096,739.78
07428-1000 RESERVOIR PUMP STATION - ENGINEER0.00
1310395622,019.7510/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/15/13 RESERVOIR RD
2,019.750.002,019.75
13113993218,056.5011/13/13100061052PENNONI ASSOCIATES INC. SERVICES THRU 10/13/13 - RESERVO RD. ACT 537 PLANNING
39945-18,056.5011/14/13100061052PENNONI ASSOCIATES INC. VOID CK. 010006
3994618,056.5011/14/13100081052PENNONI ASSOCIATES INC. SERV.THRU 10/13/13 RESERVOIR RD
18,056.500.0020,076.25
20,076.250.0020,076.25
07429-3166 DIVERSION PROJ.- LEGAL0.00
39932831.7111/13/1310005528GAWTHROP GREENWOOD & HALSTED LEGAL SERV.- 10/15-10/23/13 DEL. VALLEY REGIONAL FINANCE
JE40079831.7111/25/13RECLASSRECLASS GAWTHROP INV.113960 PAYMENT
831.71831.710.00
831.71831.710.00
07492-0550 TRF TO SEWER SINKING FUND0.00
131039704877,000.0010/24/13REIMBURSEREIMB.FR: 7105.1000 TO SEWER CAP.RESERVE FOR DIVERSION COST TRF TO SEWER CAPITAL RESERVE FUN
877,000.000.00877,000.00
877,000.000.00877,000.00
Beg Bal0.001,661,169.873,234,404.62-1573234.75

DECEMBER 2013
EAST GOSHEN MUNICIPAL AUTHORITY GOALS

ON-GOING

  1. Submit an article for each newsletter. Need by 3/1/13 - Jack; Need by 6/1/13 – Dana & Kevin; Need by 9/1/13 -; Need by 10/14/13 – Kevin
  2. Attend West Goshen Meetings quarterly – more often if needed. 1st Quarter (March) - Ed; 2nd Quarter (June) - Kevin; 3rd Quarter (September) - Ed; 4th Quarter (December) - Ed
  3. Respond to capacity requests in 45 days or less. Colonial Lane 3 EDUs received 8/19, responded 9/10 (22 days), 1637 Manley Road – 1 EDU
  4. Continue to implement I & I Plan - March Report distributed in May. September Report distributed in December
  5. Operate RCSTP in compliance with NPDES Permit - January, February, March, April, May, July, September, October, November

PROJECTS

  1. Lockwood – Final Restoration – Completed
  2. Marydell Pump Station – Construction –Project Completed
  3. Hershey Mill Pump Station – Construction – Project Completed
  4. Reserve Pump Station – Construction – Project Completed.
  5. Borrowing – Reimburse Capital Reserve for design and construction funds.. Submitted loan application. Completed

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2013\120913.doc

FIFTH SUPPLEMENTAL LEASE

THIS FIFTH SUPPLEMENTAL LEASE dated October 15, 2013, by and between EAST GOSHEN MUNICIPAL AUTHORITY, an authority organized and existing under the laws of the Commonwealth of Pennsylvania ("Authority") and the TOWNSHIP OF EAST GOSHEN, a municipality organized and existing under the laws of the Commonwealth of Pennsylvania ("Township"),

WITNESSETH:

WHEREAS, the Authority is a body corporate and politic organized by the Board of Supervisors of the Township of East Goshen, Chester County ("Township") and existing under the Municipality Authorities Act of 1945 (Act of May 2, 1945, P.L. 382, as amended and supplemented) of the Commonwealth of Pennsylvania ("Act"), as evidenced by its Certificate of Incorporation dated May 23, 1967; and

WHEREAS, the Authority was organized for the purpose of acquiring, holding, constructing, improving, maintaining and operating, owning, leasing, either in the capacity of lessor or lessee, sewers, sewer systems, or parts thereof, and sewage treatment works, including works for treating and disposing of industrial waste for the Township and for such other territory as it may be authorized to serve; and

WHEREAS, the Authority has acquired and constructed in increments a sewage collection and treatment system, which by a Contract and Lease dated December 30, 1968 ("Original Lease") it has leased to the Township, including any real estate thereafter acquired for or in connection therewith (collectively called "Sewer System"); and

WHEREAS, the Authority heretofore issued its Sewer Revenue Bonds, Series of 1968 ("1968 Bonds") secured by the Authority's Trust Indenture dated December 30, 1968 ("Original Indenture") with the National Bank of Chester County and Trust Company, as trustee, of which bank First Union National Bank is the successor by a series of mergers ("1968 Trustee"); and

WHEREAS, simultaneously with the execution of the Original Lease, the Authority assigned its interest therein to the 1968 Trustee under the Original Indenture; and

WHEREAS, to provide money for and toward the estimated cost of construction of certain Capital Additions to the Sewer System, the Authority has issued its Sewer Revenue Bonds, Series 1994 ("1994 Bonds") under and secured by the Original Indenture as supplemented by a Second Supplemental Indenture dated December 1, 1994; and

WHEREAS, the Authority sold and issued the 1994 Bonds to the Delaware Valley Regional Finance Authority ("DVRFA"); and

1

WHEREAS, the Authority and the Township entered into a Second Supplemental Lease dated December 1, 1994 ("Second Supplemental Lease") amending and supplementing the Original Lease, which Second Supplement Lease was assigned to the 1968 Trustee to secure the 1994 Bonds; and

WHEREAS, the Authority, at the request of the Township, undertook certain improvements to the Sewer System in 1998 consisting of a capital contribution to be made to West Goshen Municipal Authority to purchase additional treatment capacity in the expanded plant of such Authority (collectively "1998 Improvements"); and

WHEREAS, the Authority also determined in 1998 to refund the 1968 Bonds and the 1994 Bonds (collectively "Refunded Bonds"); and

WHEREAS, in order to provide money toward the cost of redemption and payment of the Refunded Bonds and the costs of the 1998 Improvements, the Authority issued to DVRFA its Guaranteed Note Series of 1998 in the principal amount of $1,340,000 ("1998 Note") pursuant to a Loan Agreement dated October 28, 1998 ("1998 Loan Agreement") with DVRFA; and

WHEREAS, the 1968 Trustee redeemed all of the Refunded Bonds on December 15, 1998 and, as authorized by the Indenture, the 1968 Trustee reassigned the Lease to the Authority; and

WHEREAS, the Authority and the Township entered into a Third Supplemental Lease dated October 15, 1998 ("Third Supplemental Lease") amending and supplementing the Original Lease and the Second Supplemental Lease; and

WHEREAS, in 2008, the Authority determined to undertake certain capital projects ("2008 Improvements") consisting of (i) the upgrade and expansion of the Ridley Creek Sewer Plant, (ii) improvements to the Sewer System, and (iii) the payment of the costs of issuance of the $9,500,000 Guaranteed Sewer Revenue Notes, 2008 Series ("2008 Note") pursuant to a Loan Agreement dated December 15, 2008 ("2008 Loan Agreement") with DVRFA; and

WHEREAS, the Authority and the Township entered into the Fourth Supplemental Lease dated December 15, 2008 amending and supplementing the Original Lease and the Second and Third Supplemental Leases; and

WHEREAS, the Authority has determined to undertake certain capital projects to improve the Sewer System ("2013 Improvements") for the benefit and use of the general public consisting of: (i) Reservoir Road Pump Station Diversion; (ii) elimination of Lockwood Sewer Treatment Plant; (iii) elimination of Marydell Pump Station and installation of gravity mains to divert flows; (iv) upgrade of Hershey Mill Pump Station and installation of force mains; (v) elimination of Reserve Pump Station and installation of gravity mains to divert flows; (vi) the payment of the costs of issuance of the $2,500,000 Guaranteed Sewer Revenue Notes, 2013

2

Series ("2013 Note") pursuant to a Loan Agreement dated October 15, 2013 ("2013 Loan Agreement") with DVRFA; and (vii) net excess funding in Sewer Capital Reserve Fund.

WHEREAS, the Township is willing to pay as additional rental under the Lease any amounts which may become due by the Authority under the 2013 Loan Agreement as described above (collectively "Rentals"); and

WHEREAS, the Township has agreed to lease the Sewer System from the Authority and to maintain and operate it, and has agreed in the Original Lease to fix, charge, impose and collect during the entire term of said Lease from the users of the Sewer System rents and charges which will be sufficient, together with other available funds (including tapping fees which are to be collected by it as agent of the Authority), to provide funds for the payment in each year of (i) the estimated expenses of operating, maintaining and repairing the Sewer System and the making of all ordinary improvements, additions and extensions which may be necessary or proper to provide or maintain adequate service, the costs of which are not otherwise provided for and the payment of all applicable taxes, (ii) the rentals payable under the Original Lease and under any and all supplemental or additional sewer leases, and (iii) the Administration Expenses of the Authority.

NOW, THEREFORE, in consideration of the mutual covenants hereinafter contained, each intending to be legally bound hereby, the Authority and the Township do hereby agree as follows:

ARTICLE I
DEFINITIONS

Section 1.01. All capitalized terms used herein which are not defined herein shall have the same meanings as are set forth in the Original Lease, as amended.

ARTICLE II
2013 IMPROVEMENTS

Section 2.01. The Authority agrees, out of the proceeds to be received by it from the sale of the 2013 Note and such other money as may be available to it, to pay all expenses incurred by the Authority in connection with the issuance and sale of the 2013 Note and all expenses related to the 2013 Improvements and to reimburse the Township for expenses heretofore incurred by it with respect thereto.

Section 2.02. The Township acknowledges that it has complete and satisfactory information with respect to the 2013 Improvements and with respect to the estimated cost of construction of the 2013 Improvements. To the extent that the proceeds of the 2013 Note are insufficient to pay the cost of the 2013 Improvements, as it may be modified with the prior approval of the Township, the Township will either provide funds to pay such costs or assist the Authority in obtaining such funds through supplemental financing.

3

ARTICLE III
AMENDMENTS TO ORIGINAL LEASE

Section 3.01. The Original Lease is hereby amended as set forth below in this Article. Unless otherwise indicated herein, the previous amendments to the Original Lease shall remain in effect.

Section 3.02. The terms defined in the recitals hereto are hereby added as definitions to Article I of the Original Lease.

Section 3.03. Section 2.04 is hereby amended so that section shall hereafter read in full as follows:

A. The amount to the credit of the Sewer Revenue Account shall be applied by the Township for the payment of the expenses and operation, maintenance and repair of the Sewer System and the making of all ordinary improvements and additions to such System, and the payment of administration expenses of the Authority. The Township agrees that it will not make any withdrawal from the Sewer Revenue Account except for the purposes and in the manner provided in this Section.

B. As long as the 2013 Note is outstanding, the Township shall pay to the Authority, in addition to the amounts due under the 1998 Note and 2008 Note, as additional rentals ("Rentals") for use of the Sewer System, the following: (i) on the 25th day of each month beginning in October, 2013, an amount equal to the debt service on the Note becoming due on each such date, but not exceeding in the aggregate in any calendar year the amount specified as the maximum for such year as set forth on Schedule A attached hereto, which is based upon debt service becoming due on the Note at its maximum rate of 15% per annum; and (ii) promptly upon request by DVRFA from time to time, and to the extent the revenues of the Authority are insufficient for such purpose, all amounts becoming due by the Authority to DVRFA under the 2013 Loan Agreement, all as specified in bills from DVRFA, copies of which will be promptly sent by the Authority to the Township.

C. The Township shall no longer transfer annually, after receipt of the annual financial statements of the Sewer Revenue Account and the annual financial statements of the Authority for the preceding year, from the Sewer Revenue Account to the Township's General Fund, an amount equal to one-half of the excess of total revenue of the Sewer System over total expenses of the operation of the Sewer System, including administrative costs and debt service. Such excess revenue shall instead remain in the Sewer Operating Account and shall be used to fund the debt service of the 2013 Note.

D. The balance of the Capital Additions Fund, if any, created by the Third Supplemental Lease shall be invested only as permitted by the Municipality Authorities Act, and shall be used solely for any purpose related to the Sewer System.

4

Section 3.04. Section 2.16, as added by the Second Supplemental Lease and amended by the Third and Fourth Supplemental Leases, is hereby amended to read in full as follows:

The Township hereby covenants and agrees that it will (i) include in its budget for each year the amounts payable in respect of its rental obligations under this Lease, as supplemented by the Fifth Supplemental Lease, and any subsequent Supplemental Lease, (ii) appropriate such amounts, from its general or other available revenues, to such payments, and (iii) duly and punctually pay, or cause to be paid, to the Authority or its assignee, from any of its revenues or funds, amounts due from it under the Lease, as so supplemented, at the times, in the manner, and according to the true intent and meaning thereof. For such budgeting, appropriation and payment, the Township hereby pledges its full faith, credit and taxing power. This covenant shall be specifically enforceable.

Section 3.05. Section 4.01 is hereby amended so that it will read in full as follows:

In the event that the Township shall fail to pay when due any of the Rentals provided for in Section 2.04 hereof, or shall fail to comply with any other of its covenants or agreements in this Contract and Lease, as the same has been supplemented and amended, for a period of sixty (60) days after written notice from the Authority or its attorney, the Authority or its attorney may without further notice terminate this Contract and Lease, as so supplemented and amended, and take possession of the Sewer System and each and every part thereof. In the event that the Authority shall be entitled to terminate this Contract and Lease, as so supplemented and amended, upon default of the Township as aforesaid, any trustee appointed by the holders of the Note or other obligations of the Authority and pursuant to the Municipal Authorities Act of 1945, or any receiver appointed pursuant to said Act, may as the attorney-in-fact of the Authority exercise all its rights to terminate this Contract and Lease as above provided and may take possession of the Sewer System. In the event that this Contract and Lease shall be terminated as above provided, the Township shall surrender all its books and records relating to the Sewer System and all moneys held in the Sewer Revenue Account to whomever shall take possession of the Sewer System.

Section 3.06. Section 4.02 is hereby amended so that it will read in full as follows:

The Township shall furnish to the Authority (a) on or before May 31 of each year during the term of this Contract and Lease, as supplemented and amended, commencing May 31, 2014, an operating statement for the Sewer System for the preceding Fiscal Year. Such statements shall be in such form as may be reasonably required by the Authority, showing, among other things, sewer rents and other charges (including sewer connection charges) collected; sewer rents and other charges (including sewer connection charges) due and unpaid; the amounts paid to the Authority as Rentals under Section 2.04; the amount retained as working capital; the amounts transferred to the Capital Additions Fund; the amount of assessments, if any, made; the amounts, if any, paid to the Authority representing assessments and the amount of assessments due and unpaid.

5

The annual operating statements shall be prepared and certified by an independent certified public accountant satisfactory to the Authority. Such statements shall be accompanied by a certificate of such accountant stating whether in performing its audit, the accountant has become aware of any breach by the Township of any of the provisions of this Contract and Lease, as supplemented and amended, specifying the nature of the breach.

The Township shall furnish or cause to be furnished to the Authority and DVRFA on or before June 15 of each year commencing June 15, 2014, a copy of said operating statement and report for the preceding Fiscal Year and, in addition, the following (1) a copy of the complete financial statement of the Township for the preceding fiscal year; and (2) a copy of the budget of the Township for the current fiscal year.

Section 3.07. Section 4.06 which was added by the Second Supplemental Lease and amended by the Third and Fourth Supplemental Leases at the end of Article IV of the Original Lease is hereby amended to read in full as follows:

As long as the 2013 Note is outstanding, the Township shall deliver to DVRFA, as soon as available and in any event within 120 days after the end of each fiscal year, audited financial statements of the Township or the Annual Audit and Financial Report submitted to the Department of Community and Economic Development of the Commonwealth of Pennsylvania. The treasurer of the Township shall, at the reasonable request of the DVRFA or the DVRFA's trustee, discuss its financial condition and provide the DVRFA with any information or documents necessary for the credit enhancement, remarketing or rating of the DVRFA's outstanding bonds.

Section 3.08. Section 5.01 is amended to change the termination date of the Lease to September 25, 2033.

ARTICLE IV
MISCELLANEOUS

Section 4.01. This Fifth Supplemental Lease is executed and shall be considered as supplemental to and amendatory of the Original lease, as heretofore supplemented and amended by the Second, Third and Fourth Supplemental Leases and shall form a part thereof, and the Original Lease, as so supplemented and amended, is hereby ratified and confirmed.

Section 4.02. This Fifth Supplemental Lease may be executed in any number of counterparts, each of which, when so executed and delivered, shall be an original; but such counterparts shall together constitute one and the same instrument.

6

IN WITNESS WHEREOF, the Authority and the Township have caused this Fifth Supplemental Lease to be executed and to be effective the day and year first above written.

ATTEST: EAST GOSHEN MUNICIPAL AUTHORITY
By: ____________________________________
Chairman
____________________________________
Secretary
ATTEST: EAST GOSHEN TOWNSHIP
By: ____________________________________
Chairman
____________________________________
Secretary

F:\Data\Shared Data\Finance Dept\Debt\2013 Bond Issue\lease fifth supplemental 10-15-13.doc

7

Rick Smith

From: Adams, Robert F. <rfadams@gawthrop.com>
Sent: Wednesday, October 23, 2013 10:00 AM
To: 'Rick Smith'
Cc: 'Kristin Camp'
Subject: RE: 2013 DVRFA Loan

Rick,

These changes look fine. I assume you will produce the final documents for execution by both boards.

Bob

Robert F. Adams, Esquire
Gawthrop Greenwood, PC
17 East Gay Street, Suite 100
P.O. Box 562
West Chester, PA 19381-0562
Telephone: 610-696-8225 x125
Facsimile: 610-344-0922
E-mail: rfadams@gawthrop.com
We are on the web at www.gawthrop.com

Drawing logo of Gawthrop Greenwood, PC with stylized letter G: Gawthrop Greenwood, PC Attorneys at Law

************PRIVACY NOTICE************
This e-mail message is for the sole use of the intended recipient(s). Any unauthorized review, use, disclosure or distribution is prohibited. The contents of this e-mail may be confidential and may be subject to the attorney-client and work product privileges. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. When replying, please virus-check all attachments to prevent contamination and corruption of files and operating systems.

From: Rick Smith [mailto:rsmith@eastgoshen.org]
Sent: Wednesday, October 23, 2013 8:23 AM
To: Adams, Robert F.
Cc: 'Kristin Camp'
Subject: RE: 2013 DVRFA Loan

Bob

Please see highlighted text on Page 5 and left me know if you agree with the suggested changes.

The Authority meets on November 11 and the Board on November 12..

1

Thanks

rick

From: Adams, Robert F. [mailto:rfadams@gawthrop.com]
Sent: Tuesday, October 22, 2013 2:56 PM
To: Rick Smith (rsmith@eastgoshen.org)
Cc: 'Kristin Camp'
Subject: 2013 DVRFA Loan

Rick,

As requested I have drafted a Fifth Supplemental Lease between the Township and Authority. I modified the Fourth lease that I had done in 2008 to reflect the new project and loan terms. The Fifth Amendment is attached. If it is O.K. with Kristin and you, I suggest that both bodies take action at their next meetings. I have dated the lease October 15 in the belief that all of the documents associated with the loan closing will bear the same date. This is how we did it in 2008. So, even though the actual approval and execution date will be post October 15, I have provided on the signature page that the Lease is effective the date appearing on the first page.

Bob

Robert F. Adams, Esquire
Gawthrop Greenwood, PC
17 East Gay Street, Suite 100
P.O. Box 562
West Chester, PA 19381-0562
Telephone: 610-696-8225 x125
Facsimile: 610-344-0922
E-mail: rfadams@gawthrop.com
We are on the web at www.gawthrop.com

Drawing logo of Gawthrop Greenwood, PC with stylized letter G: Gawthrop Greenwood, PC Attorneys at Law

************PRIVACY NOTICE************
This e-mail message is for the sole use of the intended recipient(s). Any unauthorized review, use, disclosure or distribution is prohibited. The contents of this e-mail may be confidential and may be subject to the attorney-client and work product privileges. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. When replying, please virus-check all attachments to prevent contamination and corruption of files and operating systems.

2

FIFTH SUPPLEMENTAL LEASE

THIS FIFTH SUPPLEMENTAL LEASE dated October 15, 2013, by and between EAST GOSHEN MUNICIPAL AUTHORITY, an authority organized and existing under the laws of the Commonwealth of Pennsylvania (“Authority”) and the TOWNSHIP OF EAST GOSHEN, a municipality organized and existing under the laws of the Commonwealth of Pennsylvania (“Township”),

WITNESSETH:

WHEREAS, the Authority is a body corporate and politic organized by the Board of Supervisors of the Township of East Goshen, Chester County (“Township”) and existing under the Municipality Authorities Act of 1945 (Act of May 2, 1945, P.L. 382, as amended and supplemented) of the Commonwealth of Pennsylvania (“Act”), as evidenced by its Certificate of Incorporation dated May 23, 1967; and

WHEREAS, the Authority was organized for the purpose of acquiring, holding, constructing, improving, maintaining and operating, owning, leasing, either in the capacity of lessor or lessee, sewers, sewer systems, or parts thereof, and sewage treatment works, including works for treating and disposing of industrial waste for the Township and for such other territory as it may be authorized to serve; and

WHEREAS, the Authority has acquired and constructed in increments a sewage collection and treatment system, which by a Contract and Lease dated December 30, 1968 (“Original Lease”) it has leased to the Township, including any real estate thereafter acquired for or in connection therewith (collectively called “Sewer System”); and

WHEREAS, the Authority heretofore issued its Sewer Revenue Bonds, Series of 1968 (“1968 Bonds”) secured by the Authority’s Trust Indenture dated December 30, 1968 (“Original Indenture”) with the National Bank of Chester County and Trust Company, as trustee, of which bank First Union National Bank is the successor by a series of mergers (“1968 Trustee”); and

WHEREAS, simultaneously with the execution of the Original Lease, the Authority assigned its interest therein to the 1968 Trustee under the Original Indenture; and

WHEREAS, to provide money for and toward the estimated cost of construction of certain Capital Additions to the Sewer System, the Authority has issued its Sewer Revenue Bonds, Series 1994 (“1994 Bonds”) under and secured by the Original Indenture as supplemented by a Second Supplemental Indenture dated December 1, 1994; and

WHEREAS, the Authority sold and issued the 1994 Bonds to the Delaware Valley Regional Finance Authority (“DVRFA”); and

1

WHEREAS, the Authority and the Township entered into a Second Supplemental Lease dated December 1, 1994 (“Second Supplemental Lease”) amending and supplementing the Original Lease, which Second Supplement Lease was assigned to the 1968 Trustee to secure the 1994 Bonds; and

WHEREAS, the Authority, at the request of the Township, undertook certain improvements to the Sewer System in 1998 consisting of a capital contribution to be made to West Goshen Municipal Authority to purchase additional treatment capacity in the expanded plant of such Authority (collectively “1998 Improvements”); and

WHEREAS, the Authority also determined in 1998 to refund the 1968 Bonds and the 1994 Bonds (collectively “Refunded Bonds”); and

WHEREAS, in order to provide money toward the cost of redemption and payment of the Refunded Bonds and the costs of the 1998 Improvements, the Authority issued to DVRFA its Guaranteed Note Series of 1998 in the principal amount of $1,340,000 (“1998 Note”) pursuant to a Loan Agreement dated October 28, 1998 (“1998 Loan Agreement”) with DVRFA; and

WHEREAS, the 1968 Trustee redeemed all of the Refunded Bonds on December 15, 1998 and, as authorized by the Indenture, the 1968 Trustee reassigned the Lease to the Authority; and

WHEREAS, the Authority and the Township entered into a Third Supplemental Lease dated October 15, 1998 (“Third Supplemental Lease”) amending and supplementing the Original Lease and the Second Supplemental Lease; and

WHEREAS, in 2008, the Authority determined to undertake certain capital projects (“2008 Improvements”) consisting of (i) the upgrade and expansion of the Ridley Creek Sewer Plant, (ii) improvements to the Sewer System, and (iii) the payment of the costs of issuance of the $9,500,000 Guaranteed Sewer Revenue Notes, 2008 Series (“2008 Note”) pursuant to a Loan Agreement dated December 15, 2008 (“2008 Loan Agreement”) with DVRFA; and

WHEREAS, the Authority and the Township entered into the Fourth Supplemental Lease dated December 15, 2008 amending and supplementing the Original Lease and the Second and Third Supplemental Leases; and

WHEREAS, the Authority has determined to undertake certain capital projects to improve the Sewer System ("2013 Improvements") for the benefit and use of the general public consisting of: (i) Reservoir Road Pump Station Diversion; (ii) elimination of Lockwood Sewer Treatment Plant; (iii) elimination of Marydell Pump Station and installation of gravity mains to divert flows; (iv) upgrade of Hershey Mill Pump Station and installation of force mains; (v) elimination of Reserve Pump Station and installation of gravity mains to divert flows; (vi) the payment of the costs of issuance of the $2,500,000 Guaranteed Sewer Revenue Notes, 2013

2

Series ("2013 Note") pursuant to a Loan Agreement dated October 15, 2013 ("2013 Loan Agreement") with DVRFA; and (vii) net excess funding in Sewer Capital Reserve Fund.

WHEREAS, the Township is willing to pay as additional rental under the Lease any amounts which may become due by the Authority under the 2013 Loan Agreement as described above (collectively “Rentals”); and

WHEREAS, the Township has agreed to lease the Sewer System from the Authority and to maintain and operate it, and has agreed in the Original Lease to fix, charge, impose and collect during the entire term of said Lease from the users of the Sewer System rents and charges which will be sufficient, together with other available funds (including tapping fees which are to be collected by it as agent of the Authority), to provide funds for the payment in each year of (i) the estimated expenses of operating, maintaining and repairing the Sewer System and the making of all ordinary improvements, additions and extensions which may be necessary or proper to provide or maintain adequate service, the costs of which are not otherwise provided for and the payment of all applicable taxes, (ii) the rentals payable under the Original Lease and under any and all supplemental or additional sewer leases, and (iii) the Administration Expenses of the Authority.

NOW, THEREFORE, in consideration of the mutual covenants hereinafter contained, each intending to be legally bound hereby, the Authority and the Township do hereby agree as follows:

ARTICLE I
DEFINITIONS

Section 1.01. All capitalized terms used herein which are not defined herein shall have the same meanings as are set forth in the Original Lease, as amended.

ARTICLE II
2013 IMPROVEMENTS

Section 2.01. The Authority agrees, out of the proceeds to be received by it from the sale of the 2013 Note and such other money as may be available to it, to pay all expenses incurred by the Authority in connection with the issuance and sale of the 2013 Note and all expenses related to the 2013 Improvements and to reimburse the Township for expenses heretofore incurred by it with respect thereto.

Section 2.02. The Township acknowledges that it has complete and satisfactory information with respect to the 2013 Improvements and with respect to the estimated cost of construction of the 2013 Improvements. To the extent that the proceeds of the 2013 Note are insufficient to pay the cost of the 2013 Improvements, as it may be modified with the prior approval of the Township, the Township will either provide funds to pay such costs or assist the Authority in obtaining such funds through supplemental financing.

3

ARTICLE III
AMENDMENTS TO ORIGINAL LEASE

Section 3.01. The Original Lease is hereby amended as set forth below in this Article. Unless otherwise indicated herein, the previous amendments to the Original Lease shall remain in effect.

Section 3.02. The terms defined in the recitals hereto are hereby added as definitions to Article I of the Original Lease.

Section 3.03. Section 2.04 is hereby amended so that section shall hereafter read in full as follows:

A. The amount to the credit of the Sewer Revenue Account shall be applied by the Township for the payment of the expenses and operation, maintenance and repair of the Sewer System and the making of all ordinary improvements and additions to such System, and the payment of administration expenses of the Authority. The Township agrees that it will not make any withdrawal from the Sewer Revenue Account except for the purposes and in the manner provided in this Section.

B. As long as the 2013 Note is outstanding, the Township shall pay to the Authority, in addition to the amounts due under the 1998 Note and 2008 Note, as additional rentals (“Rentals”) for use of the Sewer System, the following: (i) on the 25th day of each month beginning in October, 2013, an amount equal to the debt service on the Note becoming due on each such date, but not exceeding in the aggregate in any calendar year the amount specified as the maximum for such year as set forth on Schedule A attached hereto, which is based upon debt service becoming due on the Note at its maximum rate of 15% per annum; and (ii) promptly upon request by DVRFA from time to time, and to the extent the revenues of the Authority are insufficient for such purpose, all amounts becoming due by the Authority to DVRFA under the 2013 Loan Agreement, all as specified in bills from DVRFA, copies of which will be promptly sent by the Authority to the Township.

C. The Township shall no longer transfer annually, after receipt of the annual financial statements of the Sewer Revenue Account and the annual financial statements of the Authority for the preceding year, from the Sewer Revenue Account to the Township’s General Fund, an amount equal to one-half of the excess of total revenue of the Sewer System over total expenses of the operation of the Sewer System, including administrative costs and debt service. Such excess revenue shall instead remain in the Sewer Operating Account and shall be used to fund the debt service of the 2013 Note.

D. The balance of the Capital Additions Fund, if any, created by the Third Supplemental Lease shall be invested only as permitted by the Municipality Authorities Act, and shall be used solely for any purpose related to the Sewer System.

4

Section 3.04. Section 2.16, as added by the Second Supplemental Lease and amended by the Third and Fourth Supplemental Leases, is hereby amended to read in full as follows:

The Township hereby covenants and agrees that it will (i) include in its budget for each year the amounts payable in respect of its rental obligations under this Lease, as supplemented by the Fifth Supplemental Lease, and any subsequent Supplemental Lease, (ii) appropriate such amounts, from its general or other available revenues, to such payments, and (iii) duly and punctually pay, or cause to be paid, to the Authority or its assignee, from any of its revenues or funds, amounts due from it under the Lease, as so supplemented, at the times, in the manner, and according to the true intent and meaning thereof. For such budgeting, appropriation and payment, the Township hereby pledges its full faith, credit and taxing power. This covenant shall be specifically enforceable.

Section 3.05. Section 4.01 is hereby amended so that it will read in full as follows:

In the event that the Township shall fail to pay when due any of the Rentals provided for in Section 2.04 hereof, or shall fail to comply with any other of its covenants or agreements in this Contract and Lease, as the same has been supplemented and amended, for a period of sixty (60) days after written notice from the Authority or its attorney, the Authority or its attorney may without further notice terminate this Contract and Lease, as so supplemented and amended, and take possession of the Sewer System and each and every part thereof. In the event that the Authority shall be entitled to terminate this Contract and Lease, as so supplemented and amended, upon default of the Township as aforesaid, any trustee appointed by the holders of the Note or other obligations of the Authority and pursuant to the Municipal Authorities Act of 1945, or any receiver appointed pursuant to said Act, may as the attorney-in-fact of the Authority exercise all its rights to terminate this Contract and Lease as above provided and may take possession of the Sewer System. In the event that this Contract and Lease shall be terminated as above provided, the Township shall surrender all its books and records relating to the Sewer System and all moneys held in the Sewer Revenue Account to whomever shall take possession of the Sewer System.

Section 3.06. Section 4.02 is hereby amended so that it will read in full as follows:

The Township shall furnish to the Authority (a) on or before May 31 of each year during the term of this Contract and Lease, as supplemented and amended, commencing May 31, 2014, an operating statement for the Sewer System for the preceding Fiscal Year. Such statements shall be in such form as may be reasonably required by the Authority, showing, among other things, sewer rents and other charges (including sewer connection charges) collected; sewer rents and other charges (including sewer connection charges) due and unpaid; the amounts paid to the Authority as Rentals under Section 2.04; the amount retained as working capital; the amounts transferred to the Capital Additions Fund; the amount of assessments, if any, made; the amounts, if any, paid to the Authority representing assessments and the amount of assessments due and unpaid.

5

The annual operating statements shall be prepared and certified by an independent certified public accountant satisfactory to the Authority. Such statements shall be accompanied by a certificate of such accountant stating whether in performing its audit, the accountant has become aware of any breach by the Township of any of the provisions of this Contract and Lease, as supplemented and amended, specifying the nature of the breach.

The Township shall furnish or cause to be furnished to the Authority and DVRFA on or before June 15 of each year commencing June 15, 2014, a copy of said operating statement and report for the preceding Fiscal Year and, in addition, the following (1) a copy of the complete financial statement of the Township for the preceding fiscal year; and (2) a copy of the budget of the Township for the current fiscal year.

Section 3.07. Section 4.06 which was added by the Second Supplemental Lease and amended by the Third and Fourth Supplemental Leases at the end of Article IV of the Original Lease is hereby amended to read in full as follows:

As long as the 2013 Note is outstanding, the Township shall deliver to DVRFA, as soon as available and in any event within 120 days after the end of each fiscal year, audited financial statements of the Township or the Annual Audit and Financial Report submitted to the Department of Community and Economic Development of the Commonwealth of Pennsylvania. The treasurer of the Township shall, at the reasonable request of the DVRFA or the DVRFA's trustee, discuss its financial condition and provide the DVRFA with any information or documents necessary for the credit enhancement, remarketing or rating of the DVRFA's outstanding bonds.

Section 3.08. Section 5.01 is amended to change the termination date of the Lease to September 25, 2033.

ARTICLE IV
MISCELLANEOUS

Section 4.01. This Fifth Supplemental Lease is executed and shall be considered as supplemental to and amendatory of the Original lease, as heretofore supplemented and amended by the Second, Third and Fourth Supplemental Leases and shall form a part thereof, and the Original Lease, as so supplemented and amended, is hereby ratified and confirmed.

Section 4.02. This Fifth Supplemental Lease may be executed in any number of counterparts, each of which, when so executed and delivered, shall be an original; but such counterparts shall together constitute one and the same instrument.

6

IN WITNESS WHEREOF, the Authority and the Township have caused this Fifth Supplemental Lease to be executed and to be effective the day and year first above written.

ATTEST: EAST GOSHEN MUNICIPAL AUTHORITY
By: ____________________________________
Chairman
____________________________________
Secretary
ATTEST: EAST GOSHEN TOWNSHIP
By: [signature]
Chairman
[signature]
Secretary

F:\Data\Shared Data\Finance Dept\Debt\2013 Bond Issue\lease fifth supplemental final 111313.doc

7

Photograph of a sewer construction site across a field with gravel, piping, and equipment, annotated with lines indicating the location of infrastructure.

4" Pump
Manhole

Photograph of sewer construction site with a trench box, gravel, piping, and mobile pumping equipment in a grassy area bordered by trees.

Photograph of an excavation trench with a yellow excavator bucket operating near a concrete structure.

Photograph of construction machinery, including excavators and workers in safety gear, operating at an outdoor sewer project site.

CAT

Getting Started

Photograph of an orange bypass pump unit and piping located among trees and brush.

12" Creek Bypass Pump

Photograph looking inside a concrete manhole showing wastewater flowing through an invert channel with rungs of a ladder and pipe size labels.

8" Pipe All inflow →
15"
15"

Photograph close-up inside a concrete sewer manhole showing an inlet pipe with wastewater.

8" Pipe All inflow ↓

Photograph of construction personnel and heavy excavation machinery working around a vertical manhole cylinder in a deep earthen trench.

CAT

Photograph of construction workers in high-visibility gear and hard hats working in an excavation trench around a concrete manhole structure, with an excavator nearby.

Photograph of a construction worker standing near a manhole section in an excavation trench, with a Caterpillar excavator in the background.

Last Manhole Section

CAT

Photograph of a muddy excavation pit showing a concrete manhole base and pipe connection with drainage hoses and standing water.

Photograph of workers in an excavation trench removing an old manhole structure, viewed from an excavator cab.

Removing Old Manhole

Photograph of a supervisor standing on the edge of an excavation site, viewed from the cab of an excavator.

Supervisor

Photograph of workers installing a new manhole and piping in an excavation trench with an excavator assisting.

Installing Manhole + New Piping

Photograph of workers in an excavation trench installing and fitting a large black cylindrical manhole structure over utility pipes.

Photograph of the restored ground surface seeded and mulched with straw, showing a manhole cover near the treeline.

Restoration

Photograph of a restored field area with utility marker posts and a manhole near a line of trees.

Photograph of restored wetlands covered in straw mulch along a tree line.

Wetlands restored.