Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
June 25, 2013
Monday 8:00 AM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CONSIDER AWARD OF RESERVE PUMP STATION SANITARY SEWER DIVERSION BID
- AMEND MUNICIPAL AUTHORITY BUDGET
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2013\06252013 .doc
UNOFFICIAL
eBid eXchange Export
Solicitation: Reserve Pump Station Sanitary Sewer Diversion
Generated 6/19/2013 10:01:41 AM Eastern
| Number | Type | Description | Unit of Measure | Quantity | Ron Smith Inc. | A. Gargiule Sons Inc | Reybold Construction Group | Montana Construction Corp. Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | BASE | Site Preparation and Restoration. Price complete, in place | LS | 1 | $4,885.20 | $12,000.00 | $47,225.00 | $16,000.00 |
| 2 | BASE | Installation, Maintenance, and Removal of Erosion and Sediment Controls. Price complete, in place | LS | 1 | $17,852.60 | $12,000.00 | $18,700.00 | $6,000.00 |
| 3 | BASE | 8" PVC SDR 35 Sanitary Sewer Main, 0-10 ft. deep. Price complete, in place | LF | 460 | $31,740.00 | $41,400.00 | $31,050.00 | $127,880.00 |
| 4 | BASE | 8" PVC C900 Sanitary Sewer Main. Price complete, in place | LF | 157 | $13,721.80 | $23,550.00 | $16,956.00 | $44,431.00 |
| 5 | BASE | 8" PVC SDR 35 Sanitary Sewer Main, 10-15 ft. deep. Price complete, in place | LF | 118 | $10,856.00 | $14,750.00 | $11,446.00 | $32,804.00 |
| 6 | BASE | Abandon Existing 8" Sewer Main. Price complete, in place | LF | 20 | $460.00 | $2,000.00 | $2,800.00 | $20.00 |
| 7 | BASE | Manholes, 0-10 ft. deep. Price complete, in place | EA | 2 | $9,200.00 | $8,000.00 | $9,800.00 | $10,000.00 |
| 8 | BASE | Manholes, 10-15 ft. deep. Price complete, in place | EA | 2 | $10,120.00 | $10,000.00 | $12,200.00 | $9,000.00 |
| 9 | BASE | 4" Lateral Services. Price complete, in place | EA | 1 | $621.00 | $1,000.00 | $2,000.00 | $100.00 |
| 10 | BASE | Demolition of Existing Pump Station and Access Drive. Price complete, in place | LS | 1 | $2,300.00 | $10,000.00 | $16,700.00 | $5,000.00 |
| 11 | BASE | Dewatering. Price complete, in place | LS | 1 | $2,300.00 | $10,000.00 | $4,700.00 | $1,000.00 |
| TOTAL BASE BID | $104,056.60 | $144,700.00 | $173,577.00 | $252,235.00 | ||||
| 12 | ADD | Miscellaneous Excavation and Backfill with PennDOT 2A or 2B Stone. Price complete, in place | CY | 15 | $759.00 | $1,500.00 | $720.00 | $525.00 |
| 13 | ADD | Miscellaneous Excavation and Backfill with Excavated Soils. Price complete, in place | CY | 15 | $524.40 | $1,125.00 | $675.00 | $150.00 |
| 14 | ADD | Concrete Encasement. Price complete, in place | LF | 20 | $1,840.00 | $6,000.00 | $1,800.00 | $2,000.00 |
| 15 | ADD | Rock Construction Entrance #2. Price complete, in place | LS | 1 | $1,472.00 | $2,000.00 | $4,200.00 | $1,500.00 |
| TOTAL AMOUNT BID WITH ADD ITEMS | $108,652.00 | $155,325.00 | $180,972.00 | $256,410.00 |
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
| Date: | June 21, 2013 |
|---|---|
| To: | Municipal Authority |
| From: | Rick Smith, Township Manager |
| Re: | 2013 Budget |
Now that we have firm numbers for the Reserve Pump Station Diversion Project it would be appropriate to amend the Budget.
Suggested Motion: I move that we amend the 2013 Municipal Authority Budget as follows:
| 2013 Approved | Change | 2013 Revised | |
|---|---|---|---|
| Transfer from Sewer Cap Reserve | $786,769 | +$28,000 | $814,769 |
| Reserve Pump Station - Engineer | $25,000 | +11,000 | $36,000 |
| Reserve Pump Station - Construction | $93,000 | +$17,000 | $110,000 |
F:\Data\Shared Data\Finance Dept\Budget\MA Request 062113.docx