Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
March 11, 2013
Monday 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES February 11, 2013
- APPROVAL OF INVOICES Pennoni #537504 $ 5,033.00; Pennoni #537505 $ 2,167.75; Pennoni #537506 $ 570.00; Pennoni #537507 $ 2,494.00; Pennoni #537508 $ 2,496.75
- LIAISON REPORTS
- FINANCIAL REPORTS February 2013 Report
- OLD BUSINESS
- GOALS February Goals
- NEW BUSINESS Consider Potential Acceptance of Oil and Gas Waste; NPDES Compliance Inspection Report; Consider ROW Agreement From Willow Pond Homeowners Assoc.
- CAPACITY REQUESTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc Report with DMR’s; East Goshen Township Flows for January 2013
- ANY OTHER MATTER
F:\Data\Shared Data\Agendas\Municipal Authority3-11-2013 .doc
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Website Posting Date |
|---|---|
| April 2, 2013 |
F:\Data\Shared Data\Agendas\Municipal Authority3-11-2013 .doc
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
February 11, 2013
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, February 11, 2013 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Fran Beck, Jack Yahraes, and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Dan Barbato (Pennoni), Scott Towler (BFES), and Walter Wujcik (Conservancy Board).
COMMON ACRONYMS:
| Acronym | Meaning |
|---|---|
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lochwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Fran called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Fran asked if anyone would be recording the meeting and there was no response.
Chairman’s Report
None
Approval of Minutes
The Chairman noted that the minutes of the January 14, 2013 meeting were approved as corrected.
Approval of Invoices
1. Jack moved to approve payment of 5 Pennoni invoices:
| #534558 | $5,865.25 |
|---|---|
| #534559 | $5,988.75 |
| #534560 | $1200.00 |
| #534561 | $ 574.50 |
| #534562 | $ 338.75 |
Kevin seconded the motion. The motion passed unanimously.
2. Kevin moved to approve payment of the Earthcore invoice #104980 for $2,600.00. Jack seconded the motion. The motion passed unanimously.
3. Jack moved to approve payment of the Willow Pond Homeowners invoice for $1,000 and John Schroder for $1,000. Kevin seconded the motion. The motion passed unanimously.
4. Kevin moved to approve payment of the Gawthrop Greenwood invoice #106045 for $1,406.80. Jack seconded the motion. The motion passed unanimously.
F:\Data\Shared Data\Minutes\Municipal Authority3\MA 02-11-13 draft.doc
1
5. Jack moved to approve payment of the Membership fee to PA Municipal Auth. Assoc. of $950.00. Kevin seconded the motion. The motion passed unanimously.
Liaison Reports
1. Conservancy Board – Walter reported the Board received a request from a resident to consider installing a walking path at the Reservoir Road Preserve. The Board will review plans for the E Boot Road planting and will start to develop definitions for specimen trees.
Financial Reports
1. Jon Altshul, CFO, provided reports with the following comment: The Municipal Authority recorded $18,979.26 in expenses and $4.71 in revenues in the month of January, a difference of 418,974.55. The Fund balance is now $42,909.87.
Old Business
None
Goals
1. The members reviewed the goals for 2013. Jack will provide an article for the Newsletter and Ed will attend the 1st quarter meeting at West Goshen.
2. Rick reported that the Board of Supervisors reviewed the Goals for 2013 of all of the ABCs and feel that some of them are really tasks. The BOS has prioritized the goals, which Rick gave to Fran. Also, a copy of the “Action Plan” from the Comprehensive Plan was provided so the MA can locate their goals and prioritize them.
New Business
1. Bid award recommendations from Michael Ellis, Pennoni, (see attached) were reviewed by the Authority members with the following results:
a. The recommended bids are: Marydell Pump Station Diversion, Contract No. MPS-2013 with bid by Ply-Mar Construction Co, Inc. of $229,835.00 and Hershey Mill Pump Station Force Main Diversion, Contract No. HMPS-2013 with bid by Delaware Valley Utility Contractors, Inc. of $171,440.00.
b. Jack moved to award the 2 bids based on the recommendation of the Township engineer. Fran seconded the motion. The motion passed unanimously.
c. Rick reported that funds for the exceedence of the budget for the Hershey’s Mill and Reserve PS bids of approximately $9,000 will be transferred. Kevin moved to approve the transfer of $9,000 from the Marydell to the Hershey’s Mill Project. Jack seconded the motion. The motion passed unanimously.
2. Easements – Chairman Fran Beck and Secretary Kevin Cummings signed the documents for the easements at Willow Pond.
3. Comprehensive Plan update – Rick reported that a Comprehensive Plan Task Force is being formed. It will consist of 1 regular member and 1 alternate from each ABC except the Planning Commission which will have 2 members and 2 alternates. The first meeting will be Monday, February 25, 2013 at 7:00 pm at the Township Building. The update is expected to take about 18 months. The Municipal Authority will be asked to attend on an “as needed” basis.
F:\Data\Shared Data\Minutes\Municipal Authority3\MA 02-11-13 draft.doc
2
Capacity Requests
None
Sewer Reports
1. Mark Miller, Director of Public Works, provided the following report for January:
Meters – The meters were read on a daily basis with no problems to report.
CC Collection: All pump stations were visited on a daily basis. We experienced a problem at the Ashbridge pumping station due to a power outage. The transducer was knocked off line; however, the back-up float system took over the operation. Once the power was restored, we were able to bring the transducer back on line. We will be changing out the air release valve on the Ashbridge force main due to flows. This work will be done during off hours.
We received a call for a lateral blockage at 1560 Tanglewood Drive. The blockage was between the clean-out and the sewer main. Once the lateral was cleared, the line was televised and we were able to determine that the line had a sag 5 feet below the tee. A PA One Call was made for the repairs. When the line was excavated, we found a sag in the lateral 8 feet long. The pipe was removed and we over excavated the trench and installed a foot of stone to bed the pipe.
RC Collection: Hunt Country Pump station was visited on a daily basis. The wet well was scraped due to a buildup of grease.
RC Plant: The Public Works Dept. was notified of a freezing problem in the screen room. We found that both heaters were down due to a motor failure. Upon further investigation, we found the heaters to be totally rusted out. I contacted the manufacturer who advised me that the warranty was no longer available. I asked them to price out new parts and a replacement cost for new heaters as w ell. The cost to replace the units was $6,860.00. (Keep in mind they are explosion proof). The cost to replace the motors was $1,750.00. It was decided to repair the existing unites. Both units will be pulled out over the summer months due to the high humidity. We incurred a power outage at the plant on January 31 for a total of 18 hours.
Alarms: Alarms for the month ranged from power outages to a high level at the Ashbridge pumping station. We received a total of 18 alarms.
PA One Calls: We received 63 PA One calls for the month of January.
Rick reported that PECO called and wanted to shut off the switch inside the gate. Since it is inside the gate, it is the responsibility of the Township. PECO doesn’t want any liability for it. Going forward, we will need a certified electrician to turn it off and on. Mark will make some calls.
2. Pennoni: Dan Barbato provided the following engineer’s report:
Invoices: Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP) – Pennoni continues to coordinate with the Plant Operator and will provide operations assistance as needed. No issues were brought to our attention in January.
Marydell PS Elimination - We provided bid assistance services including preparation of Addendum #4, responding to questions from prospective bidders, conducting bid
F:\Data\Shared Data\Minutes\Municipal Authority3\MA 02-11-13 draft.doc
3
opening, preparing the bid tabulation, reviewing bid documents, checking contractor references, and preparing an award recommendation letter.
We continued to coordinate with the various affected utility providers. We met with PECO on-site and have coordinated with them to brace poles along the new sewer route during construction. We added notes to the plans as requested by Sunoco, and we are awaiting a determination from Sunoco regarding existing gas main depths. Verizon has not provided any comments on the plans.
Hershey’s Mill PS Diversion – We provided bid assistance services including conducting a non-mandatory pre-bid meeting on January 23, 2013, preparation of Addenda #1 and #2, responding to questions from prospective bidders, reviewing a request for an alternative “equivalent” cured-in-place manhole lining product, conducting bid opening, preparing the bid tabulation, reviewing bid documents, checking contractor references, and preparing an award recommendation letter.
We staked out the property line (one side of easement) between the Shope and Shumaker properties at 25-foot intervals.
We observed six soil auger borings along the proposed sewer alignment and prepared boring logs. The logs were included in Addendum #2 for use by directional drillers in bidding.
Reserve PS Elimination – No activity since last report.
The GP-5 “Utility Line Stream Crossing” permit does not allow any construction between March 1 and June 15 because the Ridley Creek tributary that will be crossed is a protected water use for trout stocking. We tentatively propose to put the project out to bid in March, with bids due in early April and award on April 8, 2013. The contract duration will be 120 days with flexibility on the construction start date.
Hershey’s Mill Muffin Monster
No activity since last report.
Semi-Annual I/I Analysis – We analyzed portable and permanent meter data from the 4th quarter of 2012, and we prepared a brief, interim meter analysis summary report. Meter data will be analyzed again in March, and the formal semi-annual I/I report will be submitted by March 31, 2013.
Chapter 94 Annual Reports – We began to collect data and information required to prepare the reports. We analyzed portable and permanent meter data from calendar year 2012, and we began to prepare the reports for the Westtown and West Goshen Service Areas.
DEP informed us that a Chapter 94 Report will not be required for the Lockwood Chase Sewage Treatment Plant since it was decommissioned in 2012. We will submit a letter to DEP documenting the Plant closure, in lieu of a full report, per their request.
3. Big Fish Environmental Services, Inc., Scott Towler presented a report for January 2013. The following is a summary:
Treatment Process Operation
During January, there were no exceedances of the final effluent discharge limitations for outfall 001. There was no discharge from outfall 002. The monthly average total phosphorus concentration was 0.23 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from <0.10 mg/L to .041 mg/L.
F:\Data\Shared Data\Minutes\Municipal Authority3\MA 02-11-13 draft.doc
4
As a comparison, the December 2012 monthly average total phosphorus concentration was 0.20 mg/L. The total phosphorus concentration discharged ranged from <0.10 mg/L to 0.38 mg/L.
Sequencing batch reactors (SBRs) 1, 3 and 4 were in service during the month of January. Process monitoring of each SBR included ammonia as N, nitrite as N, COD SSV MLSS and total phosphorus. Microscopic examinations and physical observation of the SBR MLSS and foam color is ongoing.
Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample of total phosphorus is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was largely consistent through January with increased volume addition towards the end of the month. The increase in alum use is largely the result of placing the LMI chemical fee pump online beginning January 23, 2013. This chemical feed pump provides aluminum sulfate solution prior to filtration to assist in total phosphorus removal.
SBR 2 remains out of service. Approximately 8 feet (154,500 gallons) of mixed liquor was transferred to the sludge holding tanks for dewatering. The remaining contents are mixed and are aerated (blower in hand mode at reduced speed). Transfer of the remaining mixed liquor will occur as freezing conditions are minimized.
Process Monitoring On-Line Instrumentation
Kershner Technologies installed a ChemScan phosphate analyzer on January 29, 2013. Comparison testing for reactive (ortho) and total phosphorus is ongoing with a formalized plan beginning February 10th.
During the month, the centrifuge dewatering system was placed in service. Sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank #1 was in service. The level at the beginning of the month was 10.54 feet and the level at the end of the month was 4.96 feet. The initial total solids concentration was 1.31% and ended the month as 0.70% total solids. A total of 118,125 gallons of supernatant was decanted during the month.
Sludge holding tank #2 was in service. The level at the beginning of the month was 8.77 feet and the level at the end of the month was 13.66 feet. The initial total solids concentration was 0.70% and ended the month as 0.73% total solids. No supernatant was decanted. Sludge was dewatered using the centrifuge.
Significant Storm Events – During January there was 1 significant rainfall event contributing to excessive influent wastewater flows to the treatment facility. The event occurred on January 31st. On the 31st, the influent flow to the SBRs was greater than 100% of the daily average hydraulic design capacity from 3:51 AM through 8:38 AM. The treatment process experienced 3 filled decants; however, the final effluent composite sample was satisfactory.
Minor Repairs & Preventative Maintenance
a. ACS was contacted to schedule repair of the influent flow chart recorder.
b. ACS was contacted to provide a flow meter signal cable to connect the new influent “field” flow meter to the influent sampler located at the doghouse manhole to provide for flow proportioned sample collection of the influent wastewater.
F:\Data\Shared Data\Minutes\Municipal Authority3\MA 02-11-13 draft.doc
5
In answer to Kevin’s question about filamentous, Scott responded that it was ok and they are still on track to being compliant.
Any Other Matter
None
Correspondence
None
Adjournment
There being no further business, Jack moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:40pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
F:\Data\Shared Data\Minutes\Municipal Authority3\MA 02-11-13 draft.doc
6
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 537504
Invoice Date : 02/20/2013
Project : EGMA1107
Project Name : HersheyMill &Reserve PS Div Des Per
For Services Rendered through: 2/10/2013
Hershey's Mill PS Diversion - Observed soil borings and prepared boring logs; field stakeout of property line; conducted pre-bid meeting; responded to prospective bidders' questions; reviewed alternative manhole lining product submission; issued Addenda #1 and #2; conducted bid opening; checked low bidder's references; and prepared bid tabulation and award recommendation letter.
Phase : 1 -- Design
| Total Phase : 1 -- Design | Labor : | 1,123.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,123.50 |
Phase : 3 -- Property Boundary Survey Allocation
| Total Phase : 3 -- Property Boundary Survey Allocation | Labor : | 1,311.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,311.50 |
Phase : 7 -- Bid Assistance
| Total Phase : 7 -- Bid Assistance | Labor : | 2,598.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 2,598.00 |
Amount Due This Invoice $5,033.00
| Fee : | 69,200.00 |
|---|---|
| Prior Billings : | 56,547.75 |
| Current Billings : | 5,033.00 |
| Total Billings : | 61,580.75 |
ok RS 2-26
7426 - 1000 $ 2516.50
7427 - 1000 $ 2516.50
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per
Invoice # : 537504
...Continued from previous page
Phase : 1 -- Design
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.25 | 110.00 | 247.50 |
| Graduate Engineer | 12.00 | 73.00 | 876.00 |
| Labor Total: | 14.25 | 1,123.50 |
| Total Phase : 1 -- Design | Labor : | $1,123.50 |
|---|---|---|
| Expense : | $0.00 |
Phase : 3 -- Property Boundary Survey Allocation
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Senior Surveyor | 2.50 | 95.00 | 237.50 |
| Senior Survey Technician | 10.00 | 65.00 | 650.00 |
| Survey Technician | 8.00 | 53.00 | 424.00 |
| Labor Total: | 20.50 | 1,311.50 |
| Total Phase : 3 -- Property Boundary Survey Allocation | Labor : | $1,311.50 |
|---|---|---|
| Expense : | $0.00 |
Phase : 7 -- Bid Assistance
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 24.25 | 95.00 | 2,303.75 |
| Graduate Engineer | 2.25 | 73.00 | 164.25 |
| Engineering Technician 1 | 2.00 | 65.00 | 130.00 |
| Labor Total: | 28.50 | 2,598.00 |
| Total Phase : 7 -- Bid Assistance | Labor : | $2,598.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per | Labor : | $5,033.00 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMA1107 Invoice Summary
Invoice Date 02/20/2013
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1107 | ||
| Pennoni Job No.: | Hershey Mill & Reserve PS Div Des Per | ||
| Invoice No: | 537504 | ||
| Invoice Period: | 2/14/2013 | to | 2/10/2013 |
| Initial Authorization: | $ 60,200.00 | Date: | 7/7/2011 |
| Contract Amount: | $ 69,200.00 | ||
| Previously Invoiced: | $ 56,547.75 | ||
| Current Invoice: | $ 5,033.00 | ||
| Invoiced to Date ($): | $ 61,580.75 | ||
| Invoiced to Date (%): | 89% | ||
| Remaining Budget ($): | $ 7,619.25 | ||
| Remaining Budget (%): | 11% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Hershey Mill & Reserve |
| Phase Budget: | $ 69,200.00 |
| Previously Invoiced: | $ 56,547.75 |
| Current Invoice: | $ 5,033.00 |
| Invoiced to Date ($): | $ 61,580.75 |
| Invoiced to Date (%): | 89% |
| Remaining Budget ($): | $ 7,619.25 |
| Remaining Budget (%): | 11% |
Comments: Hershey's Mill PS Diversion - Observed soil borings and prepared boring logs; field stakeout of property line; conducted pre-bid meeting; responded to prospective bidders' questions; reviewed alternative manhole lining product submission; issued Addenda #1 and #2 ; conducted bid opening; checked low bidder's references; and prepared bid tabulation and award recommendation letter.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 537505
Invoice Date : 02/20/2013
Project : EGMA1109
Project Name : Marydell Pump Station Diversion
For Services Rendered through: 2/10/2013
Revised plans to address Sunoco's comments on Boot Rd utility crossings; responded to prospective bidders' questions; issued Addendum #4; field meeting on-site with PECO to resolve utility pole conflicts and bracing; conducted bid opening; checked low bidder's references; and prepared bid tabulation and award recommendation letter.
Phase : 2 -- Sewer Stakeout and Easements
| Total Phase : 2 -- Sewer Stakeout and Easements | Labor : | 308.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 308.75 |
Phase : 3 -- PaDEP Closure Plan
| Total Phase : 3 -- PaDEP Closure Plan | Labor : | 206.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 206.25 |
Phase : 5 -- Bid Assistance
| Total Phase : 5 -- Bid Assistance | Labor : | 235.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 235.25 |
Phase : 6 -- Additional Meetings
| Total Phase : 6 -- Additional Meetings | Labor : | 1,417.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,417.50 |
Amount Due This Invoice $2,167.75
| Fee : | 36,100.00 |
|---|---|
| Prior Billings : | 31,509.00 |
| Current Billings : | 2,167.75 |
| Total Billings : | 33,676.75 |
ok RS 2/25
7425 - 1000
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1109 -- Marydell Pump Station Diversion
Invoice # : 537505
...Continued from previous page
Phase : 2 -- Sewer Stakeout and Easements
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 3.25 | 95.00 | 308.75 |
| Labor Total: | 3.25 | 308.75 |
| Total Phase : 2 -- Sewer Stakeout and Easements | Labor : | $308.75 |
|---|---|---|
| Expense : | $0.00 |
Phase : 3 -- PaDEP Closure Plan
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 0.25 | 95.00 | 23.75 |
| Graduate Engineer | 2.50 | 73.00 | 182.50 |
| Labor Total: | 2.75 | 206.25 |
| Total Phase : 3 -- PaDEP Closure Plan | Labor : | $206.25 |
|---|---|---|
| Expense : | $0.00 |
Phase : 5 -- Bid Assistance
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 0.75 | 95.00 | 71.25 |
| Staff Engineer | 1.50 | 85.00 | 127.50 |
| Graduate Engineer | 0.50 | 73.00 | 36.50 |
| Labor Total: | 2.75 | 235.25 |
| Total Phase : 5 -- Bid Assistance | Labor : | $235.25 |
|---|---|---|
| Expense : | $0.00 |
Phase : 6 -- Additional Meetings
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 14.25 | 95.00 | 1,353.75 |
| Staff Engineer | 0.75 | 85.00 | 63.75 |
| Labor Total: | 15.00 | 1,417.50 |
| Total Phase : 6 -- Additional Meetings | Labor : | $1,417.50 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1109 -- Marydell Pump Station Diversion | Labor : | $2,167.75 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMA 1109 Invoice Summary
Invoice Date 02/20/2013
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1109 | ||
| Pennoni Job No.: | Marydell Pump Station Diversion | ||
| Invoice No: | 537505 | ||
| Invoice Period: | 1/14/2013 | to | 2/10/2013 |
| Initial Authorization: | $ 45,100.00 | Date: | 2/22/2012 |
| Contract Amount: | $ 36,100.00 | ||
| Previously Invoiced: | $ 31,509.00 | ||
| Current Invoice: | $ 2,167.75 | ||
| Invoiced to Date ($): | $ 33,676.75 | ||
| Invoiced to Date (%): | 93% | ||
| Remaining Budget ($): | $ 2,423.25 | ||
| Remaining Budget (%): | 7% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Marydell Pump Station Diversion |
| Phase Budget: | $ 36,100.00 |
| Previously Invoiced: | $ 31,509.00 |
| Current Invoice: | $ 2,167.75 |
| Invoiced to Date ($): | $ 33,676.75 |
| Invoiced to Date (%): | 93% |
| Remaining Budget ($): | $ 2,423.25 |
| Remaining Budget (%): | 7% |
Comments: Revised plans to address Sunoco's comments on Boot Rd utility crossings; responded to prospective bidders' questions; issued Addendum #4; field meeting on-site with PECO to resolve utility pole conflicts and bracing; conducted bid opening; checked low bidder's references; and prepared bid tabulation and award recommendation letter.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 537506
Invoice Date : 02/20/2013
Project : EGMA1301
Project Name : 2013 General Services
For Services Rendered through: 2/10/2013
Engineer's report and attendance at January MA Meeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 570.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 570.00 |
Amount Due This Invoice $570.00
| Fee : | 10,000.00 |
|---|---|
| Prior Billings : | 338.75 |
| Current Billings : | 570.00 |
| Total Billings : | 908.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 6.00 | 95.00 | 570.00 |
| Labor Total: | 6.00 | 570.00 |
| Total Phase : **** -- Professional Services | Labor : | $570.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1301 -- 2013 General Services | Labor : | $570.00 |
|---|---|---|
| Expense : | $0.00 |
ok 2/25
7424 - 3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1301 Invoice Summary
Invoice Date 2/20/2013
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1301 | ||
| Pennoni Job No.: | 2013 General Services | ||
| Invoice No: | 537506 | ||
| Invoice Period: | 1/14/2013 | to | 2/10/2013 |
| Initial Authorization: | $ 10,000.00 | Date: | 1/1/2013 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 570.00 | ||
| Invoiced to Date ($): | $ 570.00 | ||
| Invoiced to Date (%): | 6% | ||
| Remaining Budget ($): | $ 9,430.00 | ||
| Remaining Budget (%): | 94% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2013 General Services |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 570.00 |
| Invoiced to Date ($): | $ 570.00 |
| Invoiced to Date (%): | 6% |
| Remaining Budget ($): | $ 9,430.00 |
| Remaining Budget (%): | 94% |
Comments: Engineer's report and attendance at January MA Meeting.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 537507
Invoice Date : 02/20/2013
Project : EGMA1302
Project Name : 2013 Semi-Annual I&I Reports
For Services Rendered through: 2/10/2013
Analyzed September thru December 2012 mid-period portable and permanent meter flow data; and prepared and issued interim flow meter summary report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 2,494.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 2,494.00 |
Amount Due This Invoice $2,494.00
| Fee : | 10,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 2,494.00 |
| Total Billings : | 2,494.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 10.50 | 95.00 | 997.50 |
| Graduate Engineer | 20.50 | 73.00 | 1,496.50 |
| Labor Total: | 31.00 | 2,494.00 |
| Total Phase : **** -- Professional Services | Labor : | $2,494.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1302 -- 2013 Semi-Annual I&I Reports | Labor : | $2,494.00 |
|---|---|---|
| Expense : | $0.00 |
ok RS 2/25
7424 3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1302 Invoice Summary
Invoice Date 2/20/2013
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1302 | ||
| Pennoni Job No.: | 2013 Semi-Annual I&I Reports | ||
| Invoice No: | 537507 | ||
| Invoice Period: | n/a | to | 2/10/2013 |
| Initial Authorization: | $ 10,000.00 | Date: | 1/1/2013 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 2,494.00 | ||
| Invoiced to Date ($): | $ 2,494.00 | ||
| Invoiced to Date (%): | 25% | ||
| Remaining Budget ($): | $ 7,506.00 | ||
| Remaining Budget (%): | 75% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2013 Semi-Annual I&I Reports |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 2,494.00 |
| Invoiced to Date ($): | $ 2,494.00 |
| Invoiced to Date (%): | 25% |
| Remaining Budget ($): | $ 7,506.00 |
| Remaining Budget (%): | 75% |
Comments: Analyzed September thru December 2012 mid-period portable and permanent meter flow data; and prepared and issued interim flow meter summary report.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 537508
Invoice Date : 02/20/2013
Project : EGMA1303
Project Name : 2012 Chapter 94 Report
For Services Rendered through: 2/10/2013
Began preparation, analyses, and obtaining information for Chapter 94 Report; coordination with DEP to determine reporting requirements for Lockwood Chase STP.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 2,496.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 2,496.75 |
Amount Due This Invoice $2,496.75
| Fee : | 14,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 2,496.75 |
| Total Billings : | 2,496.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 1.50 | 95.00 | 142.50 |
| Graduate Engineer | 32.25 | 73.00 | 2,354.25 |
| Labor Total: | 33.75 | 2,496.75 |
| Total Phase : **** -- Professional Services | Labor : | $2,496.75 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1303 -- 2012 Chapter 94 Report | Labor : | $2,496.75 |
|---|---|---|
| Expense : | $0.00 |
ok RS 2/25
7424 3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1303 Invoice Summary
Invoice Date 2/20/2013
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1303 | ||
| Pennoni Job No.: | 2012 Chapter 94 Report | ||
| Invoice No: | 537508 | ||
| Invoice Period: | 1/14/2013 | to | 2/10/2013 |
| Initial Authorization: | $ 14,000.00 | Date: | 1/1/2013 |
| Contract Amount: | $ 14,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 2,496.75 | ||
| Invoiced to Date ($): | $ 2,496.75 | ||
| Invoiced to Date (%): | 18% | ||
| Remaining Budget ($): | $ 11,503.25 | ||
| Remaining Budget (%): | 82% |
Budget by Phase:
| Phase Summary | Amount |
|---|---|
| Phase No. | **** |
| Phase Name: | 2012 Chapter 94 Report |
| Phase Budget: | $ 14,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 2,496.75 |
| Invoiced to Date ($): | $ 2,496.75 |
| Invoiced to Date (%): | 18% |
| Remaining Budget ($): | $ 11,503.25 |
| Remaining Budget (%): | 82% |
Comments: Began preparation, analyses, and obtaining information for Chapter 94 Report; coordination with DEP to determine reporting requirements for Lockwood Chase STP.
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA February Financial Report
Date: March 7, 2013
The Municipal Authority recorded $19,794.15 in expenses and $32,118.39 in revenues (primarily from a $30,000 transfer from the sewer capital reserve fund, but also from the repayment of the Pine Rock loan) in the month of February, a difference of $12,324.24. The fund balance is now $55,234.11.
I am also attaching a worksheet for the 2013 quarterly administrative charge back. We plan to charge this amount in March (and June, September and December) to the Municipal Authority for overhead costs.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
(610) 692-7171
March 1, 2013
MUNICIPAL AUTHORITY EXPENSES:
1st QTR 2013
| Description | AMOUNT | NOTES |
|---|---|---|
| ABC Secretarial Services (Preparing & distributing packets): | $1,758.12 | 15% of salary & benefits |
| Secretarial Services (Taking & Preparing Minutes): | $210.00 | 6 hours @ $35 hours/hour |
| Director of Finance/Treasurer | $1,109.68 | 5% of salary & benefits |
| Staff Accountant: | $970.58 | 5% of salary & benefits |
| Director of Public Works: | $1,869.66 | 5% of salary & benefits |
| Manager: | $2,062.32 | 5% of salary & benefits |
| Total | $7,980.36 | |
| Account Number | 07424-1400 |
Tia Piccolo
Staff Accountant
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
February 2013
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 42,909.87 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 50.00 | 4.91 | 8.88 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 50.00 | 4.91 | 8.88 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 992,470.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 992,470.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | (992,420.00) | 4.91 | 8.88 | |
U:\bmccool\2013\Municipal Authority\2013 - 02 - Municipal Authority Report.xlsx Page 1 of 3 03/06/2013
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
February 2013
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 50.00 | 0.48 | 1.22 |
| C.C. TAPPING FEES | 07364 1100 | 128,000.00 | 0.00 | 0.00 |
| R.C.TAPPING FEES | 07364 1110 | 2,000.00 | 0.00 | 0.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 1,689.64 | 1,689.64 |
| MISCELLANEOUS REVENUE | 07380 1000 | 1,000.00 | 423.36 | 423.36 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 121,696.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 252,746.00 | 2,113.48 | 2,114.22 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 33,547.00 | 0.00 | 0.00 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 5,000.00 | 0.00 | 1,450.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 8,843.00 | 0.00 | 0.00 |
| ENGINEERING SERVICES | 07424 3130 | 35,000.00 | 1,538.75 | 4,803.50 |
| LEGAL SERVICES | 07424 3140 | 7,000.00 | 1,406.80 | 4,695.90 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 20,720.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 6,003.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 5,583.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 121,696.00 | 2,945.55 | 10,949.40 | |
| OPERATING NET RESULT | 131,050.00 | (832.07) | (8,835.18) | |
U:\bmccool\2013\Municipal Authority\2013 - 02 - Municipal Authority Report.xlsx Page 2 of 3 03/06/2013
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
February 2013
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07392 0804 | 992,470.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 556,769.00 | 30,000.00 | 30,000.00 |
| TOTAL REVENUE | 1,549,239.00 | 30,000.00 | 30,000.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 25,000.00 | 5,988.75 | 11,482.50 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 170,000.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 574.50 | 1,086.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 55,769.00 | 0.00 | 246.01 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | (179.90) | 200.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 25,000.00 | 5,532.62 | 7,829.74 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 46,000.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 25,000.00 | 4,932.63 | 6,979.76 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 93,000.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 439,769.00 | 16,848.60 | 27,824.01 | |
| CAPITAL NET RESULT | 1,109,470.00 | 13,151.40 | 2,175.99 | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 55,234.11 | |||
U:\bmccool\2013\Municipal Authority\2013 - 02 - Municipal Authority Report.xlsx Page 3 of 3 03/06/2013
MARCH 2013
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
ON-GOING
- Submit an article for each newsletter. Need by 3/1/13 - Jack; Need by 6/1/13; Need by 9/1/13; Need by 12/1/13
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) - Ed; 2 nd Quarter (June); 3 rd Quarter (September); 4 th Quarter (December)
- Respond to capacity requests in 45 days or less.
- Continue to implement I & I Plan
- Operate RCSTP in compliance with NPDES Permit
PROJECTS
- Lockwood – Final Restoration
- Marydell Pump Station – Construction – Bid awarded
- Hershey Mill Pump Station – Construction - Bid awarded
- Reserve Pump Station – Construction -
- Borrowing – Reimburse Capital Reserve for design and construction funds.
C:\Documents and Settings\ssmith\Local Settings\Temporary Internet Files\Content.Outlook\RMBFGY1L\031113.doc
[Seal: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY]
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION III
1650 Arch Street
Philadelphia, Pennsylvania 19103-2029
February 7, 2013
[Stamp: RECEIVED FEB 13 2013 BY _____]
Louis Smith Jr. Twp Manager
Ridley Creek WWTP
1580 Paoli Pike
West Chester, PA 19380-6107
Re: Potential Acceptance of Oil and Gas Waste
NPDES Permit No - PA0050504
Dear Louis Smith Jr., Twp Manager
The purpose of this letter is to clarify the procedures that a publicly-owned treatment works (POTW) in Pennsylvania must follow and approvals that must be obtained prior to a POTW accepting a new waste, including any waste that is significantly different than a previously accepted waste, for disposal or treatment. In the Commonwealth of Pennsylvania, the Pennsylvania Department of Environmental Protection (PADEP) is authorized to implement the National Pollutant Discharge Elimination System (NPDES) Permit Program under U.S. Environmental Protection Agency (EPA) oversight, with the exception of the Pretreatment Program which the EPA implements. Your facility has been identified as one which is covered by an NPDES permit issued by PADEP, but not currently covered under a Pretreatment Program approved by EPA.
Issuance of an NPDES permit authorizes a facility to discharge waste in accordance with the permit and consistent with the quantity and characteristics of the waste identified in the NPDES permit application submitted by the permittee. Where the quantity or characteristics of the waste change, the discharger is required to notify the permitting authority, obtain a revised NPDES permit, and obtain approval of revisions to its approved pretreatment program as necessary to prevent pass through and interference with operations at the POTW. For POTWs, 40 CFR Part 122.42(b) requires that the POTW provide adequate notification of:
- any new introduction of pollutants into the POTW from an indirect discharger which would be subject to section 301 or 306 of CWA if it were directly discharging those pollutants; and
- any substantial change in the volume or character of pollutants being introduced into that POTW by a source introducing pollutants into the POTW at the time of permit issuance.
[Logo: Recycled paper] Printed on 100% recycled/recyclable paper with 100% post-consumer fiber and process chlorine free.
Customer Service Hotline: 1-800-438-2474
In addition, EPA also evaluates the notification to determine if the POTW will be required to develop and implement an approved pretreatment program. As an alternative, EPA may require that the POTW develop and enforce local limits to control the waste without development and implementation of a full pretreatment program in accordance with 40 CFR 403.5(c)(2). Note that all industrial user discharges to the POTW must comply with the specific prohibitions of 40 CFR 403.5(b), any applicable categorical standards, and any state and local limits.
Additional information on natural gas extraction can be found on EPA's website at the following address: http://www.epa.gov/hydraulicfracture/. Guidance on the basic requirements of the pretreatment program can be found on EPA's website at: http://www.epa.gov/npdes/pubs/pretreatment_program_intro_2011.pdf. Information on development of local limits including EPA's Local Limits Development Guidance and a spreadsheet for calculation of local limits can be found at this web address: http://www.epa.gov/reg3wapd/npdes/?tab1=3.
If you have any questions regarding this matter, please do not hesitate to contact me at 215-814-5790 or via email at lovell.john@epa.gov.
Sincerely,
[Signature: John Lovell]
John Lovell
Pretreatment Program Coordinator
NPDES Permits Branch (3WP41)
Water Protection Division
cc: Jenifer Fields, PADEP Southeast Region
Ron Furlan, PADEP Central Office
Kelly Heffner, PADEP Central Office
3800-FM-WSFR0168A 11/2005
[Logo: DEP COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION]
[Stamp: RECEIVED MAR - 6 2013 BY _____]
NPDES COMPLIANCE INSPECTION REPORT
Section A: National Data System Coding
| NPDES | Mo. / Day / Yr. | Inspection Type | Inspection ID No. |
|---|---|---|---|
| P A 0 0 5 0 5 0 4 | 0 2 2 1 1 3 | R T N C |
| Primary Facility Name East Goshen Municipal Authority |
Municipal Authority or Operating Authority East Goshen |
|
|---|---|---|
| Location of Facility 1751 Towne Drive |
Permit Expiration Date 2/28/2017 |
|
| Municipality East Goshen |
County Chester |
Permit Renewal Application Due 9/1/2016 |
| Primary Facility Kind [X] Sewage [ ] Industrial Waste [ ] Stormwater [ ] Other |
||
|
Responsible Person Mr. Louis F. Smith, Jr Title Township Manager Address 1580 Paoli Pike West Chester, PA 19380 Business Phone Number: 610-692-7171 FAX Number: E-mail Address: |
Operator in Responsible Charge Scott Towler Certificate Number: T0390 Class & Subclasses: A, E 1,2,3,4 Client ID Number: 196196 Address: Business Phone Number: 484-401-4198 Cell Phone Number: E-mail Address: scott@bfesi.com |
|
|
VIOLATIONS: [ ] Yes [ ] Samples have been collected by the Department, violations may be revealed upon receipt of the analysis. No violations noted. See Page 2 for additional information. |
||
| Name of Person Interviewed: Scott Towler | Date: 2/21/13 | Name of Inspector: Michael Brenner Date: 2/21/13 |
| Signature of Person Interviewed: Phone Number: 484-401-4198 |
Signature of Inspector: [Signature: Michael Brenner] Phone Number: 484-250-5154 |
|
| Title: Operator | Title: Water Quality Specialist | |
This document is official notification that a representative of the Department of Environmental Protection inspected the above facility or site. The findings of this inspection are shown above and on any attached pages.
Any violations which were uncovered during the inspection are indicated. Violations may also be discovered upon examination of the results of laboratory analyses of the discharge and review of Department records. Notification will be forthcoming, if such violations are noted.
Page 1 of 4
3800-FM-WSFR0168A 11/2005
[Logo: DEP COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION]
NPDES COMPLIANCE INSPECTION REPORT
Treatment Process
| Treatment Units | Total | On-Line | Inoperable | Comments |
|---|---|---|---|---|
| Muffin Monster | 1 | 1 | 0 | |
| Auger Monster | 1 | 1 | 0 | |
| Sequencing batch reactor | 4 | 3 | 0 | Only need three due to low flows |
| Disc filter | 2 | 2 | 0 | |
| Ultraviolet disinfection | 2 | 1 | 0 | Alternate active bank |
| Sludge holding tank | 2 | 2 | 0 | |
| Post-EQ tank | 2 | 2 | 0 |
Chemical Additions: Alum, magnesium hydroxide (intermittent)
Process Control
| Parameter | Inspector Comments/Observations/Results |
|---|---|
| [X] Color and [X] Odor | Good color, no odor |
| [X] Settleability (ml/L) | ~150-180 |
| [ ] Dissolved Oxygen (mg/L) | |
| [ ] Sludge Blanket (ft.) | |
| [ ] Mixed Liquor Suspended Solids (mg/L) [ ] MLVSS | |
| [ ] Microscopic Examination of MLSS | |
| [ ] Others |
Page 2 of 4 Date:2/21/2013 Permit No.: PA0050504
3800-FM-WSFR0168A 11/2005
[Logo: DEP COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION]
NPDES COMPLIANCE INSPECTION REPORT
Additional Comments
On this date, I conducted a routine inspection of the Ridley Creek STP in East Goshen Township. I was accompanied by Scott Towler of Big Fish Environmental Services, the certified operator, and Rob Sieve of Aqua, who performs routine operations. I made the following observations:
- Influent flows are around 280,000-300,000. The plant is rated for 750,000 gpd. With average flows and loading being so far below design, the plant has had some operational and compliance challenges since its upgrade. Construction on the new plant began in 2008, and it was fully online in May 2010. The plant has been in compliance since October 2012. Scott said that a large volume of flow is expected to be routed to the plant beginning this summer, which will put the plant at around 85% of its design volume.
- Influent passes through a Muffin Monster and an Auger Monster. Both units appeared to be working properly. The auger was not running when I checked it. Rob said that it activates automatically based on time, or on the height of water flowing into it (i.e. an accumulation of solids will cause it to run). Magnesium hydroxide slurry is sometimes used for pH adjustments. Rob said that soda ash seems to work better, so the magnesium hydroxide isn't used as often.
- There are four sequencing batch reactors (SBRs). One of these units, SBR #2, is offline. That tank isn't needed because influent flows are so low. The tank can be used for storage during a major storm, as it was during Hurricane Sandy. A small amount of mixed liquor is kept in the tank to protect the treatment equipment. That tank was being aerated when I inspected it. I detected no foul odors around the SBRs.
- The online SBRs appeared to be working properly. Each unit goes through a six-hour treatment cycle. The first two hours are the "fill" phases, which include anoxic static fill, mix static fill, and aerated fill. A total of 220 minutes of the 360 minute cycle is used for aeration (including aerated fill). One hour is used for settling. During "storm mode", only about 90 minutes are used for aeration. The settle time is also slightly decreased. Decanted water is sent to the disc filters. There are about 25-50 minutes of idle time in each SBR per cycle. I observed significant foam on the aerated SBRs. Scott and Rob said that there is a bit of a problem with filamentous bacteria, which is a symptom of the insufficient loading to the plant (i.e. low F/M ratio). The hope is that this problem will be alleviated this summer when flow and loading are increased.
Page 3 of 4 Date:2/21/2013 Permit No.: PA0050504
3800-FM-WSFR0168A 11/2005
[Logo: DEP COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION]
NPDES COMPLIANCE INSPECTION REPORT
Additional Comments
- Effluent from the SBRs goes to the two post-EQ tanks, which aerates the SBR effluent. Water from these tanks goes to a floc tank mixer, where alum is added. From there, it's split between the two disc filters. Both filters were online and appeared to be functioning properly. The backwash from the filters goes to the influent wet well. Filter #2 is expected to be taken offline soon for cleaning.
- The ultraviolet disinfection system appeared to be working properly. There are two banks of bulbs. Usually, only one bank is on at a time. The active bank is alternated every three weeks. During periods of high flow (i.e. over 300,000 gpd), both banks are used. The final effluent was very clear.
- Scott reported a problem with grease in the influent. He said that grease is skimmed from the influent wet well about three times per week. He said that the Township has an active program aimed at reducing grease loading to the sewer system. The Township handles all aspects of collection system maintenance, including infiltration and inflow mitigation.
- Rob informed me about a problem with the inflow flow meter, which has apparently been reporting inaccurately high numbers. Lenny Electric has been called to service the meter.
- Influent and effluent samples are flow-proportioned.
- There are two sludge holding tanks. Generally, under current flow conditions, only one SHT is needed. However, both were in use during the inspection. Sludge is aerated at all times, except prior to a decant. The plant had produced almost 273,000 gallons of sludge to date in February.
Page 4 of 4 Date:2/21/2013 Permit No.: PA0050504
[Logo: Willow Tree]
WILLOW POND HOMEOWNERS ASSOCIATION
P.O. BOX 1176
FRAZER, PA 19355
March 4, 2013
Louis F. Smith, Jr.
Township Manager
East Goshen Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Re: ROW Agreement WPHA
Dear Rick:
Enclosed is the executed ROW agreement with the correct acknowledgement pursuant to your instructions. You indicated you would provide a copy of the recorded document when it is available.
I have received the check. Thank you.
Any further follow up to my attention.
Very truly yours,
[Signature: Joseph Zulli]
Joseph Zulli
President
Willow Pond Homeowners Association
Respond to 14 Pond View Lane, Malvern, PA 19355 or jdzulli@comcast.net
Prepared by/Return to:
Robert F. Adams, Esquire
P. O. Box 562
West Chester, PA 19381-0562
UPI # 53-2F-76.1
RIGHT-OF-WAY AGREEMENT
THIS AGREEMENT, made this ________ day of ________________________, 2013, between EAST GOSHEN MUNICIPAL AUTHORITY ("Authority"), a body corporate and politic organized and existing under and by virtue of the laws of the Commonwealth of Pennsylvania, in East Goshen Township, Chester County, Pennsylvania, and WILLOW POND HOMEOWNERS ASSOCIATION ("Owner"), also of East Goshen Township, Chester County, Pennsylvania,
WITNESSETH:
WHEREAS, the Owner owns a tract of land situate in East Goshen Township ("Township"), Chester County, Pennsylvania, located on the north side of Forest Lane, recorded in Book 2199, page 0291, in the office of the Recorder of Deeds of Chester County, Pennsylvania; and
WHEREAS, the Authority is now constructing modifications to the sewer system for the Township, as part of the project to eliminate the pump station at the Reserve at Spring Meadows, to serve certain areas of the Township for which the Authority must obtain a certain right-of-way and easement upon, over and under the aforesaid tract of land of the Owner.
NOW, THEREFORE, in consideration of the mutual covenants hereinafter contained, and in consideration of the payment to the Owner of the sum of One Dollar ($1.00) and other good and valuable consideration, receipt of which is hereby acknowledged by the Owner, the Authority and the Owner, each intending to be legally bound hereby, do hereby agree as follows:
1. DEFINITIONS: The term "sewer lines" when used in this instrument shall refer to a sanitary sewer pipe, conduit, manhole, drain, marker, service connection and other appurtenances to be constructed by the Authority, meeting the specifications of the consulting engineers of the Authority, as approved by the Authority for use in the aforesaid sewer system within the sanitary sewer easement on Owner's property, as shown on the plan of "Proposed Easement for Proposed Sanitary Sewer Main" (Sketch No. 0076.01) prepared by Pennoni Associates, Inc., marked Exhibit "A," attached hereto and made a part hereof.
1
2. GRANT TO AUTHORITY: The Owner hereby gives and grants to the Authority the free and uninterrupted right, liberty and privilege:
A. To install, construct, reconstruct, replace, remove, enlarge, inspect, operate, repair, make connections with and maintain perpetually such sewer lines, their accessories and appurtenances, as the Authority may from time to time require, consisting of underground pipes, conduits, manholes, drains, markers, mains, service connections and other appurtenances upon, over and under a strip of land of variable width, between 10.31 and 11.04 feet wide, more or less, across the aforesaid tract of land belonging to Owner as shown on Exhibit "A," and as more particularly described by metes and bounds on Exhibit "B," together with a temporary construction easement, as shown on Exhibit "A," during the period of construction.
B. To carry away and dispose of sewage through said sewer lines, regardless of the source of such sewage.
TO HAVE AND TO HOLD the same perpetually to the Authority and its successors or assigns, together with the right and privilege at any and all times to enter the said premises, or any part thereof, provided that the Authority gives to the Owner reasonable advance notification of the nature of any intended work on the premises and the expected duration of such work, for the purpose of installing, constructing, reconstructing, replacing, removing, enlarging, inspecting, operating, repairing, maintaining, and/or making connections with the sewer lines or other appropriate means of access to the sewer lines; all upon the condition that the Authority will at all times during the construction, reconstruction, replacement, removal, repair or maintenance of the sewer lines cause every reasonable means to be used to protect from injury or damage all property, including lawns, trees, shrubbery, fences, buildings, walls, roads, water courses, natural features, or any existing improvement thereto, and will at all times after doing any work in connection with the construction, reconstruction, replacement, removal, repair or maintenance of the sewer lines, cause the said premises to be restored to the condition in which the same were found before such work was undertaken, including replacement and/or repair of damaged property, to the extent reasonably possible under the circumstances and consistent with the rights and privileges herein granted.
AND, the Authority hereby agrees to indemnify, hold harmless and defend the Owner from any loss, damage or liability incurred by Owner and caused by the acts, omissions, negligence or willful misconduct of the Authority, its agents, employees, contractors and other permitted users in connection with the exercise of its rights hereunder.
2
3. COVENANTS OF THE OWNER:
A. The Owner does hereby release, remise, quitclaim and discharge the Authority, the Township and their several agents, servants, contractors and employees from any claim or right to damages or other emolument of value for the rights, liberties and privileges given and granted to the Authority under this Indenture.
B. The Owner does hereby covenant that it is lawfully seized and possessed of a good and marketable title in fee simple to the aforesaid tract of land and that it has a good and lawful right to grant the rights and privileges herein granted to the Authority, and it further covenants that it will execute or procure any additional necessary assurances of the rights and privileges herein granted.
C. The Owner does hereby expressly consent to any transfer, conveyance, pledge, lease or mortgage by the Authority of the said sewer lines, including, but not limited to, the leasing thereof by the Authority, as lessor, to the Township, as lessee.
D. The Owner does hereby covenant that no structure or other obstruction shall be erected or permitted on the aforesaid strip of land.
E. The provisions of this Indenture shall be binding upon and inure to the benefit of the Authority, its successors and assigns, and the Owner, its successors and assigns.
IN WITNESS WHEREOF, the parties hereto have caused this Indenture to be duly executed on the day and year first above written.
|
Attest: |
EAST GOSHEN MUNICIPAL AUTHORITY |
|---|---|
|
Attest: |
WILLOW POND HOMEOWNERS ASSOCIATION |
3
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF CHESTER
ON THIS, the ________ day of ________________________, 2013, before me, a notary public in and for said County and Commonwealth, personally appeared ______________________________________, who acknowledged himself to be the Chairman of EAST GOSHEN MUNICIPAL AUTHORITY, and that he, as such, being authorized to do so, executed the foregoing instrument for the purposes therein contained.
WITNESS my hand and official seal.
__________________________________________________
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF CHESTER
ON THIS, the 26th day of Feb, 2013, before me, a notary public, in and for the aforesaid County and Commonwealth, personally appeared Joseph Dennis Zulli, who acknowledged himself/herself to be the Pres. of WILLOW POND HOMEOWNERS ASSOCIATION, and that he/she, as such, being authorized to do so, executed the foregoing instrument for the purposes therein contained.
WITNESS my hand and notarial seal.
[Signature: Michele Minniti]
__________________________________________________
[Notarial Seal: COMMONWEALTH OF PENNSYLVANIA Notarial Seal Michele Minniti, Notary Public West Whiteland Twp., Chester County My Commission Expires June 15, 2014]
4
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
March 8, 2013
To: Municipal Authority
From: Mark Miller
Re: February 2013 Monthly Report
Meters: The meters have been installed and working well. We had a problem with the portable meter at Reservoir and Strasburg Road, Allied Control found the main board had failed meter was pulled and sent out for repair.
Pump Stations: Were visited on a daily basis bar screens were cleaned and the walls were cleaned. The Mary Dell pump station called in several alarms last Sunday. We found a bad float which was replaced. We contacted Aqua Wastewater to vac the wet well due to heavy grease build up.
C.C. Collection: We were notified of a lateral backup at 1448 Linden Lane. We made several attempts to clear the clog unfortunately the clog was in the trap. We utilized the jetter to clean the main, once that was done we dropped the camera in the main and televised the 8" line which was clear; however when we looked at the lateral connection we could see a heavy root buildup. We made several more attempts to clear the roots to no avail. We excavated the lateral (see attached photos) and found the trap completely blocked. We installed a new trap and clean out. We televised the lateral prior to backfilling and everything is ok.
We were notified of a manhole over flowing on Paoli Pike; it turned out to be a Verizon manhole.
R.C. Collection: We did televising of some lines at Pulte homes to investigate for sump pump tie-ins; we found no evidence of sump pumps.
R.C. Plant: The plant operator notified us of heavy grit build up in front of the muffin monster. I contacted Aqua Wastewater for a vac truck, the line was completely cleaned. Lenni Electric was utilized to install four – 220
outlets for the pressure washer at various locations at the plant. We are in the process of fabricating three pipe stands for the filtration pumps; this will allow us to remove pumps for servicing.
Pipe Data View cleaned and televised 20,000 feet of pipe between both systems during the month. No pipe problems to report; however we needed to replace several manhole castings.
Alarms: We received a total of 26 alarms.
PA One Calls: We received 58 PA One calls for the month of February.
[Photograph: Sewer lateral excavation showing two workers wearing red hard hats and high-visibility safety jackets inside an excavation trench supported by trench shoring panels and adjustable struts.]
Color photograph showing two workers in hard hats and high-visibility clothing working inside a deep excavated trench reinforced with shoring panels and struts, with an extension ladder on the left and a green "EAST GOSHEN TOWNSHIP RECYCLES" bin visible on the ground above.
Color photograph looking down into a shored excavation trench with a ladder and horizontal struts, showing a worker in a red hard hat and high-visibility jacket working at the bottom.
[Photograph: View looking down into the excavation trench showing trench shoring panels, adjustable metal struts, and wooden bracing installed to secure the excavation walls.]
EGMA 1301
[Pennoni logo]
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Daniel Barbato, P.E.
Authority Engineer
DATE: March 7, 2013
SUBJECT: Engineer’s Report
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Pennoni continues to coordinate with the Plant Operator and will provide operations assistance as needed. No issues were brought to our attention in February. Our review of the monthly operations report does not indicate any concerns.
Marydell PS Elimination
- We attended a pre-construction meeting with the Township and Ply-Mar Construction (Contractor) and a follow-up pre-construction meeting with the Township, Ply-Mar, PennDOT, and PECO.
- We issued a contract award letter to Ply-Mar. We have also reviewed Ply-Mar’s contract documents and have coordinated with them to have their insurance coverages revised to comply with contract requirements. They informed us they are in the process of having their insurance revised, but they do not yet have a revised insurance certificate to submit for review and approval.
- Pending approval of the insurance, we intend to issue the Notice to Proceed with Construction on March 18. Ply-Mar intends to mobilize later that week and begin construction on March 25. They estimate 6-8 weeks to complete the project.
- We continued attempts to coordinate with the various affected utility providers. PECO will brace utility poles during the work, but we are awaiting a determination from them as to how exactly they will brace them. We have submitted plans to Sunoco and Verizon, and we are still awaiting feedback from them.
- We prepared a Construction Issue set of plans and specifications incorporating changes from the four addenda, and the documents were issued to Ply-Mar and the Township. We also prepared a CAD file and plan with critical survey information for the
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2013\Memo to EGMA Board 2013-03-07 final.docx
EGMA 1301
Contractor’s use in construction layout. Additionally, we reviewed a partial submission of shop drawings from the Contractor.
Hershey’s Mill PS Diversion
- We issued a contract award letter to the Contractor, Delaware Valley Utility Contractors (DVUC). We have also reviewed DVUC’s contract documents and have coordinated with them to have their insurance coverages revised to comply with contract requirements.
- DVUC proposes to begin work on May 6. We intend to issue the Notice to Proceed with Construction by early April. They estimate approximately one month to complete the project.
- We prepared a Construction Issue set of plans and specifications incorporating changes from the two addenda, and the documents were issued to the Township. We are also in the process of reviewing shop drawings from the Contractor.
Reserve PS Elimination
- We completed near-final Bid Plans and submitted them to the Township for review. The specifications will be completed and submitted for Township review by March 15.
- The project will be put out to bid after the Reserve at Spring Meadows HOA has granted the easement and rock borings are performed.
Chapter 94 Annual Reports
- We have continued to collect data and information required to prepare the reports. We analyzed portable and permanent meter data from calendar year 2012, and we are in the process of preparing the reports for the Ridley Creek, West Goshen, and Westtown Service Areas. DEP previously informed us that a full report is not required for the Lockwood Chase STP.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2013\Memo to EGMA Board 2013-03-07 final.docx
[Big Fish Environmental Services Inc. logo]
Monthly Operations Report: February 2013
Treatment Process Operation
During February, there were no exceedances of the final effluent discharge limitations for outfall 001. There was no discharge from outfall 002. The monthly average total phosphorus concentration was 0.20 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.14 mg/L to 0.26 mg/L.
Table 1 provides the details of the final effluent total phosphorus concentrations during February.
| Table 1 | |
|---|---|
| Final Effluent: Outfall 001 | |
| Sample Date | Total Phosphorus, mg/L |
| 2/5/2013 | 0.14 |
| 2/14/2013 | 0.26 |
| 2/19/2013 | 0.19 |
| 2/26/2013 | 0.21 |
| Monthly Average | 0.20 |
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of February. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Microscopic examinations and physical observation of the SBR MLSS and foam color is ongoing.
Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was largely consistent through February with increasing uniformity during the month. The addition of aluminum sulfate solution, using the LMI chemical feed pump, prior to the disc filters has assisted with improving total phosphors from the final effluent outfall. Graph NO. 1 illustrates the aluminum sulfate solution daily volume usage from December 2012 through February 2013.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 4
Big Fish Environmental Services Inc.
Graph No. 1
RCSTP Dec. 2012, Jan. 2013 & Feb 2013
Alum, gallons
Line graph plotting Alum, gallons (vertical axis from 0.00 to 140.00 in increments of 20.00; horizontal axis numbered 1 to 81).
SBR No. 2 remains out of service. The remaining contents are continuously mixed and are aerated (blower in hand mode at reduced speed) to prevent odors. Transfer of the remaining mixed liquor will occur as freezing conditions are minimized.
Process Monitoring On-Line Instrumentation:
Kershner Technologies installed a ChemScan phosphate analyzer on January 29, 2013. Comparison data from the online analyzer and on site testing is ongoing.
Representatives from the Hach Chemical Company has requested an opportunity to conduct a pilot study demonstrating their online phosphorus monitoring system. Coordination of a pilot study is planned to begin late March or April
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 4
[Big Fish Environmental Services Inc. logo]
Presented below is a summary of the flow data for February 2013. The influent flow meter located prior to the Screening building not reported. The flow meter appears to have malfunctioned as observed through recording significantly higher flow volumes than the influent flow meter to the SBR. Allied Control Services (ACS) was contacted to address the malfunction.
Flow data:
| Flow Meter Location | February 2013 | |
|---|---|---|
| Total Volume for Month, MGD | Average Daily Flow, gpd | |
| Influent Wastewater to Screening Building | NA | NA |
| Influent Wastewater to SBRs | 9.578 | 342,073 |
| Internal Recycle | NA | NA |
| Treated Effluent to Disc Filters | 9.251 | 330,410 |
| Final Effluent Discharge | 7.069 | 252,449 |
| Applebrook Golf Course | 0 | 0 |
Chemical Usage:
| Chemical | February 2013 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 375 lbs./day | 10.500 pounds |
| Magnesium Hydroxide | 0 gpd | 0 gallons |
| Aluminum sulfate solution | 42.6 gpd | 1,192 gallons |
| Polymer (centrifuge) | 4.5* | 63 gallons |
*Fourteen (14) days of centrifuge operation
Solids Dewatering and Disposal: February 2013
During the month, the centrifuge dewatering system was placed in service. Presented below is a summary of the solids processing activity:
| Sludge Dewatering Summary | |
|---|---|
| Gallons of sludge dewatered | 331,802 gallons |
| Average Dewatered Total Solids, % | 18.2%* (estimated on-site data) |
| Wet Tons | NA data was not available during report preparation |
| Dry Tons | NA data was not available during report preparation |
| Number of dumpsters | 5 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 4
[Big Fish Environmental Services Inc. logo]
During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank No. 1 was in service. The level at the beginning of the month was 4.93 feet and the level at the end of the month was 12.28 feet. The initial total solids concentration was 0.66% and ended the month as 0.80% total solids. Zero (0) gallons of supernatant were decanted during the month.
Sludge holding tank No. 2 was in service. The level at the beginning of the month was 14.48 feet and the level at the end of the month was 2.53 feet. The initial total solids concentration was 0.87% and ended the month as 0.70% total solids. 27,475 gallons of supernatant were decanted. Sludge was dewatered using the centrifuge.
Significant Storm Events
During February there were no significant precipitation events impacting the treatment process.
Minor Repairs and Preventative Maintenance
- ACS repaired influent flow chart recorder.
- ACS provided a flow meter signal cable and connected the new influent “field” flow meter to allow for flow proportioned composite sampling.
- Centrifuge gear box was inspected for routine O&M. No metal filings were observed.
- Centrifuge rear bearing is operating at a higher temperature than the front bearing. The bearing temperature is generally around 150°F. Emergency shutdown is 212°F. Centrifuge operators recommend corrective actions should the temperature rise above 180°F.
- Filed influent composite sampler controller failed. The controller from another sampler was temporarily installed until the repaired unit is returned. A spare unit is planned for purchase.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 4
2008 FLOWMETERS
2013 FEBRUARY 1ST QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY GPD | ELLIS LANE READING | ELLIS LANE GPD | PAOLI PIKE READING | PAOLI PIKE GPD | WILSON DRIVE READING | WILSON DRIVE GPD | SUMMIT GPD | NET FLOWS |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 02/01/13 | 156,065 | 1,528,000 | 27,648,377 | 168,530 | 13,766,799 | 65,820 | 15,757,352 | 83,170 | 20,400 | 1,210,480 |
| 0.20 | 02/02/13 | - | - | ||||||||
| 0.00 | 02/03/13 | - | - | ||||||||
| 0.00 | 02/04/13 | 159,966 | 1,300,333 | 27,686,344 | 126,557 | 13,782,858 | 53,530 | 15,774,711 | 57,863 | 20,400 | 1,062,383 |
| 0.02 | 02/05/13 | 161,117 | 1,151,000 | 27,696,633 | 102,890 | 13,787,107 | 42,490 | 15,781,453 | 67,420 | 20,400 | 938,200 |
| 0.00 | 02/06/13 | 162,514 | 1,397,000 | 27,709,162 | 125,290 | 13,792,602 | 54,950 | 15,790,232 | 87,790 | 20,400 | 1,128,970 |
| 0.00 | 02/07/13 | 163,773 | 1,259,000 | 27,720,537 | 113,750 | 13,797,883 | 52,810 | 15,798,076 | 78,440 | 20,400 | 1,014,000 |
| 0.25 | 02/08/13 | 165,014 | 1,241,000 | 27,731,807 | 112,700 | 13,802,549 | 46,660 | 15,805,060 | 69,840 | 20,400 | 1,011,800 |
| 0.50 | 02/09/13 | ||||||||||
| 0.00 | 02/10/13 | ||||||||||
| 0.38 | 02/11/13 | 168,850 | 1,278,667 | 27,769,231 | 124,747 | 13,818,505 | 53,187 | 15,823,332 | 60,907 | 20,400 | 1,039,827 |
| 0.00 | 02/12/13 | 170,266 | 1,416,000 | 27,784,314 | 150,830 | 13,825,604 | 70,990 | 15,831,612 | 82,800 | 20,400 | 1,111,380 |
| 0.23 | 02/13/13 | 171,563 | 1,297,000 | 8,726 | 8,726 | 4,147 | 4,147 | 15,839,468 | 78,560 | 20,400 | 1,205,567 |
| 0.00 | 02/14/13 | 172,838 | 1,275,000 | 18,729 | 18,729 | 10,990 | 10,990 | 15,847,167 | 76,990 | 20,400 | 1,168,291 |
| 0.00 | 02/15/13 | 174,161 | 1,323,000 | 28,846 | 101,170 | 17,934 | 69,440 | 15,855,652 | 84,850 | 20,400 | 1,067,540 |
| 0.00 | 02/16/13 | ||||||||||
| 0.00 | 02/17/13 | ||||||||||
| 0.00 | 02/18/13 | ||||||||||
| 0.37 | 02/19/13 | ||||||||||
| 0.00 | 02/20/13 | 180,474 | 1,262,600 | 78,441 | 99,190 | 51,235 | 66,602 | 15,888,409 | 65,514 | 20,400 | 1,031,294 |
| 0.00 | 02/21/13 | 181,738 | 1,264,000 | 87,336 | 88,950 | 58,334 | 70,990 | 15,897,322 | 89,130 | 20,400 | 1,014,930 |
| 0.00 | 02/22/13 | 182,983 | 1,245,000 | 96,539 | 92,030 | 64,948 | 66,140 | 15,905,636 | 83,140 | 20,400 | 1,003,690 |
| 0.00 | 02/23/13 | ||||||||||
| 0.00 | 02/24/13 | ||||||||||
| 0.00 | 02/25/13 | 186,733 | 1,250,000 | 123,977 | 91,460 | 85,025 | 66,923 | 15,926,572 | 69,787 | 20,400 | 1,021,830 |
| 0.38 | 02/26/13 | 187,962 | 1,229,000 | 132,575 | 85,980 | 91,703 | 66,780 | 15,934,929 | 83,570 | 20,400 | 992,670 |
| 0.08 | 02/27/13 | 189,275 | 1,313,000 | 143,393 | 108,180 | 99,183 | 74,800 | 15,943,948 | 90,190 | 20,400 | 1,039,830 |
| 0.00 | 02/28/13 | 190,604 | 1,329,000 | 154,942 | 115,490 | 106,647 | 74,640 | 15,953,012 | 90,640 | 20,400 | 1,048,230 |
| 2.68 | 1,297,700 | 101,955 | 56,216 | 77,811 | 20,400 | 1,061,717 |
EG TWP
MONTH TO DATE: 2.68
NORMAL MONTH TO DATE:
YEAR TO DATE: 10
NORMAL YEAR TO DATE:
2013 flowmeters -all-stations separate month worksheets,004.xls
3/6/2013 11:17 AM
2008 FLOWMETERS
2013 1st. Quarter - METERS FROM WEST GOSHEN - CC COLLECTION
| DATE | HERSHEY'S MILL READING | HERSHEY'S MILL GPD | ASHBRIDGE READING | ASHBRIDGE GPD | HICKS METER READING | HICKS METER GPD | RESERVOIR READING | RESERVOIR GPD | SHERMAN READING | SHERMAN GPD | BARKWAY READING | BARKWAY GPD |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 02/01/13 | 11,313,826 | 1,101,380 | ||||||||||
| 02/02/13 | ||||||||||||
| 02/03/13 | ||||||||||||
| 02/04/13 | 11,586,481 | 908,850 | ||||||||||
| 02/05/13 | 11,668,965 | 824,840 | ||||||||||
| 02/06/13 | 25,421,028 | 97,733 | 11,769,879 | 1,009,140 | ||||||||
| 02/07/13 | 25,429,936 | 89,080 | 1,598,725 | 66,457 | 11,861,279 | 914,000 | 988,136 | 6,989 | 2,686,473 | 11,146 | ||
| 02/08/13 | 11,950,468 | 891,890 | ||||||||||
| 02/09/13 | ||||||||||||
| 02/10/13 | ||||||||||||
| 02/11/13 | 12,219,097 | 895,430 | ||||||||||
| 02/12/13 | 25,476,483 | 93,094 | 1,602,092 | 67,340 | 12,321,674 | 1,025,770 | 992,077 | 7,882 | 2,692,336 | 11,726 | ||
| 02/13/13 | 12,415,737 | 940,630 | ||||||||||
| 02/14/13 | 25,494,841 | 91,790 | 1,603,380 | 64,400 | 12,510,087 | 943,500 | 993,876 | 8,995 | 2,694,304 | 9,840 | ||
| 02/15/13 | 12,606,068 | 959,810 | ||||||||||
| 02/16/13 | ||||||||||||
| 02/17/13 | ||||||||||||
| 02/18/13 | ||||||||||||
| 02/19/13 | 25,542,062 | 94,442 | 1,606,643 | 65,260 | 998,482 | 9,212 | 2,699,809 | 11,010 | ||||
| 02/20/13 | 13,057,194 | 902,252 | ||||||||||
| 02/21/13 | 25,558,572 | 82,550 | 1,607,884 | 62,050 | 13,149,851 | 926,570 | 999,810 | 6,640 | 2,701,810 | 10,005 | ||
| 02/22/13 | 13,240,830 | 909,790 | ||||||||||
| 02/23/13 | ||||||||||||
| 02/24/13 | ||||||||||||
| 02/25/13 | 13,505,588 | 882,527 | ||||||||||
| 02/26/13 | 25,601,197 | 85,250 | 1,611,116 | 64,640 | 13,595,159 | 895,710 | 1,003,319 | 7,018 | 2,707,207 | 10,794 | ||
| 02/27/13 | 13,691,792 | 966,330 | ||||||||||
| 02/28/13 | 25,617,617 | 82,100 | 1,612,406 | 64,500 | 13,787,413 | 956,210 | 1,004,709 | 6,950 | 2,709,064 | 9,285 | ||
| 89,505 | 64,950 | 0 | 936,368 | 7,669 | 10,544 |
2013 flowmeters -all-stations separate month worksheets,004.xls
3/6/2013 11:17 AM
2013 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,277,069 | 120,481 | 60,165 | 63,671 | 20,400 | 89,992 | 70,106 | 922,377 | 7,363 | 11,147 | |
| FEBRUARY | 1,297,700 | 101,955 | 56,216 | 77,811 | 20,400 | 89,500 | 64,950 | 936,368 | 7,669 | 10,544 | |
| MARCH | |||||||||||
| APRIL | |||||||||||
| MAY | |||||||||||
| JUNE | |||||||||||
| JULY | |||||||||||
| AUGUST | |||||||||||
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,287,385 | 111,218 | 58,191 | 70,741 | 20,400 | 89,746 | 67,528 | 0 | 929,373 | 7,516 | 10,846 |
To
West Goshen 1,047,235
2013 flowmeters -all-stations separate month worksheets;004.xlsSUMMARY
2013 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | |
|---|---|---|---|---|---|
| JANUARY | 1,277,069 | 120,481 | 60,165 | 63,671 | 20,400 |
| FEBRUARY | 1,297,700 | 101,955 | 56,216 | 77,811 | 20,400 |
| MARCH | |||||
| APRIL | |||||
| MAY | |||||
| JUNE | |||||
| JULY | |||||
| AUGUST | |||||
| SEPTEMBER | |||||
| OCTOBER | |||||
| NOVEMBER | |||||
| DECEMBER | |||||
| Total Flows | |||||
| Monthly Ave | 1,287,385 | 111,218 | 58,191 | 70,741 | 20,400 |
Flowmeters February 2013
Line chart showing daily flowmeter readings ("Flow's") for February 2013 across days 1 through 28 ("Day of the Month").
- Vertical Axis (Flow's): 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000
- Horizontal Axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28
- Legend: February
Monthly Totals 2012 Jan-Dec
Bar chart showing flowmeter readings ("Flowmeters") by month ("Month") from January through December, with daily/series bars displayed across the January and February intervals.
- Vertical Axis (Flowmeters): 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000
- Horizontal Axis (Month): January, February, March, April, May, June, July, August, September, October, November, December
February Precip. 2.68 - 2013
Bar chart (rotated page) of daily precipitation in inches for February 2013. Bars appear on days 3, 6, 9, 10, 12, 14, 20, 27 and 28; the tallest is day 10 at about 0.5.
- Vertical axis (precip.): 0, 0.05, 0.1, 0.15, 0.2, 0.25, 0.3, 0.35, 0.4, 0.45, 0.5
- Horizontal axis (snow/rain): days 1 through 30
- Legend: February
2013 Monthly Precipitation
Bar chart showing monthly precipitation for 2013 across January through December, with bars plotted for January (approx. 4.2) and February (approx. 2.68).
- Vertical Axis: 0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5, 4, 4.5
- Horizontal Axis: January, February, March, April, May, June, July, August, September, October, November, December
- Legend: Series1