Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
September 8, 2014
Monday 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE — a. Ask if anyone will be taping the meeting?
  2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS — a. Director of Public Works Report; b. Pennoni Engineer's Report; c. Big Fish Environmental Inc. Report with DMR's August; d. East Goshen Township Flows
  4. 3. APPROVAL OF MINUTES — a. August 11, 2014
  5. 4. APPROVAL OF INVOICES
Item Vendor Invoice Amount
a. Pennoni Invoice #603380 $ 111.25
b. Pennoni Invoice #603381 $ 781.25
c. Pennoni Invoice #603382 $ 556.00
  1. LIAISON REPORTS
  2. FINANCIAL REPORTS — a. August 2014 Report
  3. OLD BUSINESS
  4. GOALS

a. Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014

May 8 – The MA does not have a current mission statement. A first draft included in the packet. June 9 – Changed "lease" to "leasee". Mission Statement approved by MA on June 9 - Completed

b. Submit an article for each newsletter – Due date for newsletter
Need by 1/31/14 – Dana Completed
Need by 4/30/14 – Jack Completed
Need by 7/1/14 - Kevin Completed

F:\Data\Shared Data\Agendas\Municipal Authority\2014\9-8-14 -.doc

Need by 10/31/14

c. Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014

May 8 - Revisions submitted to EGMA, EGPC, WGSTP, CCHD, and CCPC
July 14 – BOS scheduled to adopt resolution at their meeting on August 19.
Resolution adopted and Plan revision sent to PA DEP on August 25.

d. Develop a recommendation on covers for the SBRs – August 1, 2014

May 8 – Draft memo distributed. June 9 – Final memo in packet - Completed

e. Attend West Goshen Meetings quarterly – more often if needed.

1st Quarter (March) – Jack- Completed
2nd Quarter (June) – Ed- Completed
3rd Quarter (September) Ed - Completed
4th Quarter (December)

f. Respond to capacity requests in 45 days or less.
211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house, 3 Lucas Lane – 44 EDUs.

g. Continue to implement I & I Plan

April 14 – Status Report received

h. Operate RCSTP in compliance with NPDES Permit

January, February, March, May, June, July

  1. NEW BUSINESS
  2. CAPACITY REQUESTS
  3. ANY OTHER MATTER
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2014\9-8-14 -.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

September 5, 2014

To: Municipal Authority
From: Mark Miller
Re: August 2014 Monthly Report

Meters: The permanent meters were read on a daily basis, no problems to report.

C.C. Collection: The pumping stations were visited on a daily basis. Wet wells were cleaned. We were notified about a lateral back up in Hershey Mill Estates. It turned out that the problem was the homeowner's responsibility. We had to perform a stream bank restoration on the Ashbridge line as the banks had eroded which exposed the pipe. We had to replace 180 feet of sewer main between Forrest Lane and Willow Pond, the pipe was crushed in several areas.

R.C. Collection: The pumping station was visited on a daily basis with no problems to report.

R.C. Plant: We had some alarm problems at the plant. Verizon was notified when we last a phone line; once the phone line was repaired we still had problems with the alarm panel. The alarm panel was repaired and the system was put back on line.

Alarms: We responded to 15 alarms for the month of August.

PA One Calls: We received 88 PA One calls in August.

Emergency Call: 10 emergency call outs for the month of August.

EGMA 1401

Pennoni
M E M O R A N D U M

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager

FROM: Michael Ellis, P.E.
Authority Engineer

DATE: September 4, 2014

SUBJECT: Engineer's Report

Invoices

  • Invoices with summaries are provided under separate cover.

Reservoir Road Pump Station Act 537 Plan

  • The 30-day public comment period on the Act 537 Plan Update ended on August 14 th . No written comments were received.
  • The Plan Update was adopted by the East Goshen Township Board of Supervisors on August 19 th .
  • The Plan Update submitted to PADEP on August 25 th .
  • It is our understanding that Conestoga-Rovers & Associates resubmitted revised plans to USFWS around July 10 th to address their bog turtle protection comments at the Chester Creek crossing. We are still awaiting USFWS approval. We have received informal feedback from USFWS so we do not expect substantial comments that would impact the Plan Update that was submitted to PADEP.
  • Tentative Act 537 Planning schedule:
Task Estimated Date
Submission to PADEP August 25, 2014
USFWS Bog Turtle Habitat Formal Approval TBD
PADEP Review and Approval (120 days) by December 23, 2014

Reserve Pump Station Elimination

  • The contractor submitted revised as-built plans that were found acceptable. It is our understanding that the additional restoration work at the former driveway location has also been performed.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-09-04.docx

EGMA 1401

New Sewer Connections

  • We reviewed a grinder pump plan submission for a proposed house at 610 Reservoir Road.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-09-04.docx

Big Fish Environmental Services Inc.

Monthly Operations Report: August 2014

Treatment Process Operation

During July 2014, there were no exceedances of the final effluent discharge limitations for outfall 001 and discharge from Outfall 002. The total phosphorus monthly average concentration of 0.36 mg/L as compared to the permitted limitation of 0.50 mg/L. The initial total phosphorus sample concentration for July 22, 2014 was reported as 2.1 mg/L. The sample was retested within the 28 day holding time which produced a concentration of 0.15 mg/L. The average of the two values were reported within the DMR. Table 1 illustrates the final effluent composite sample data reported for the July 2014 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.14 mg/L to 1.13 mg/L. A daily average of 80 gpd of aluminum sulfate solution was used as compared to the 92 gpd average for July.

Table 1: July 2014 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations / Sample Date Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus, Total, mg/L Phosphorus, Total lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
July 1, 2014 0.270 2.0 4.5 8 18 0.16 0.36 0.20 0.45 1 0.0000
July 8, 2014 0.166 3.7 5.1 3 4 0.10 0.14 0.14 0.19 1 0.0000
July 15, 2014 0.199 3.0 5.0 2 3 0.12 0.19 0.37 0.61 1 0.0000
July 22, 2014 0.182 2.0 3.0 4.0 6 0.17 0.26 1.13 1.72 1 0.0000
July 29, 2014 0.214 2.4 4.3 2.0 4 0.12 0.22 0.17 0.30 1 0.0000
July 31, 2014 0.186 0.140 0.22
Average 0.203 2.6 4.4 4 8 0.134 0.24 0.36 0.74 1 0.0000
Minimum 0.166 2.0 3.0 2 3 0.100 0.14 0.14 0.19 1 0.0000
Maximum 0.270 3.7 5.1 8 18 0.169 0.36 1.13 1.72 1 0.0000

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 1 of 9

Big Fish Environmental Services Inc.

A total of 4,265,236 gallons, which represented a daily average of 137,588 gpd, of treated effluent was discharged to Applebrook, Outfall 002. Table 2 represents the final effluent water quality data used to prepare the DMR for outfall 002.

Table 2: July 2014 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations / Sample Date Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus, Total, mg/L Phosphorus, Total lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
July 1, 2014 0.1366 2.0 2.3 8 9 0.160 0.18 0.20 0.23 1 0.0000
July 8, 2014 0.1357 3.7 4.2 3 3 0.100 0.11 0.14 0.16 1 0.0000
July 15, 2014 0.1320 3.0 3.3 2 2 0.117 0.13 0.37 0.41 1 0.0000
July 22, 2014 0.1409 2.0 2.4 4 5 0.169 0.20 1.13 1.33 1 0.0000
July 29, 2014 0.1414 2.4 2.8 2 2 0.123 0.15 0.17 0.20 1 0.0000
July 31, 2014 0.138 0.14 0.16
Average 0.1374 0.0 3.0 4 4 0.134 0.15 0.36 0.41 1 0.0000
Minimum 0.1320 2.0 2.3 2 2 0.100 0.11 0.14 0.16 1 0.0000
Maximum 0.1414 3.7 4.2 8 9 0.169 0.20 1.13 1.33 1 0.0000

Table 3 illustrates the influent wastewater pollutant loadings for June 2014. The influent loadings remained within the treatment facility design loadings. A discussion of the influent ammonia as nitrogen concentrations and loadings are provided in an attached memorandum as an appendix to this report.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 2 of 9

Big Fish Environmental Services Inc.

Table 3: July 2014 - Influent Wastewater

Design Basis / Sample Date Flow MGD Average BOD5 mg/L BOD5 lbs/day TSS mg/L TSS lbs/day NH4-N mg/L NH4-N lbs/day TKN, mg/L mg/L TKN, mg/L lbs/day Phosphorus, Total, mg/L mg/L Phosphorus, Total, mg/L lbs/day
Design Basis 335 2,098 320 2,001 32 200 48 301 9.1 57
July 1, 2014 0.397 297 983 312 1,033 29.2 97 46.5 154 6.3 21
July 8, 2014 0.345 172 569 68 225 36.2 120 42.7 141 4.8 16
July 15, 2014 0.327 351 1,162 368 1,218 36.1 120 56.8 188 8.3 27
July 22, 2014 0.409 298 987 420 1,391 35.0 116 49.9 165 7.4 25
July 29, 2014 0.409 139 460 320 1,060 34.2 113 45.2 150 7.0 23
Average 0.377 251 925 298 967 34.1 113 48.2 162 6.8 22
Minimum 0.327 139 569 68 225 29.2 97 42.7 141 4.8 16
Maximum 0.409 351 1162 420 1391 36.2 120 56.8 188 8.3 27

Table 4 presents the available Outfall 001 final effluent data for the month of August 2014. There are no anticipated exceedances of the permitted limitations for the month of August. The fecal coliform sample result for August 12, 2014 is suspected as being the result of a sampling or test error. The effluent clarity and flows rates were observed to be within design basis of the facility. The subsequent test results for fecal coliform were reported as no detectable. The ultraviolet lamps presently exceed 21,000 hour per bank, whereas the lamps are reported as 70% at 9,800 hours. Replacement of one bank, 40 lamps is planned during September. The lamps in the second bank will be replaced during early 2015 to offset replacement of lamps by 6 months.

Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 3 of 9

Big Fish Environmental Services Inc.

Table 4: August 2014 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations / Sample Date Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus, Total, mg/L Phosphorus, Total lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
August 5, 2014 0.180 5.4 8.1 4 6 0.25 0.38 0.15 0.23 1 0.0000
August 12, 2014 0.175 3.4 5.0 3 4 0.17 0.25 0.18 0.26 530 2.7243
August 19, 2014 0.217 2.0 3.6 2 4 0.16 0.29 0.15 0.27 1 0.0000
August 26, 2014 0.169 0.00 0.17 0.24 1 0.0000
Average 0.185 3.6 5.6 3 5 0.195 0.23 0.16 0.25 5 0.6811
Minimum 0.169 2.0 3.6 2 4 0.161 0.00 0.15 0.23 1 0.0000
Maximum 0.217 5.4 8.1 4 6 0.253 0.38 0.18 0.27 530 2.7243

During July 2014, treated effluent was discharged to Applebrook continuously. The data is presented in Table 5.

Table 5: August 2014 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations / Sample Date Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus, Total, mg/L Phosphorus, Total lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
August 5, 2014 0.1108 5.4 5.0 4 4 0.253 0.23 0.15 0.14 1 0.0000
August 12, 2014 0.1202 3.4 3.4 3 3 0.170 0.17 0.18 0.18 530 2.7243
August 19, 2014 0.1352 2.0 2.3 2 2 0.161 0.18 0.15 0.17 1 0.0000
August 26, 2014 0.1102 0.000 0.00 0.17 0.16 1 0.0000
Average 0.1191 0.0 3.6 3 3 0.146 0.15 0.16 0.16 133 0.6811
Minimum 0.1102 2.0 2.3 2 2 0.000 0.00 0.15 0.14 1 0.0000
Maximum 0.1352 5.4 5.0 4 4 0.253 0.23 0.18 0.18 530 2.7243

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 4 of 9

Big Fish Environmental Services Inc.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during July.

Table 6: August 2014 - Influent Wastewater

Design Basis / Sample Date Flow MGD Average BOD5 mg/L BOD5 lbs/day TSS mg/L TSS lbs/day NH4-N mg/L NH4-N lbs/day TKN, mg/L mg/L TKN, mg/L lbs/day Phosphorus, Total, mg/L mg/L Phosphorus, Total, mg/L lbs/day
Design Basis 335 2,098 320 2,001 32 200 48 301 9.1 57
August 5, 2014 0.323 175 471 268 721 26.3 71 37.8 102 4.1 11
August 12, 2014 0.385 150 404 151 406 36.8 99 52.5 141 6.2 17
August 19, 2014 0.394 347 934 317 853 33.2 89 53.1 143 6.6 18
August 26, 2014 0.343
Average 0.361 224 603 245 660 32.1 86 47.8 129 5.6 15
Minimum 0.323 150 404 151 406 26.3 71 37.8 102 4.1 11
Maximum 0.394 347 934 317 853 36.8 99 53.1 143 6.6 18

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of June and July.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations increased slightly during August to as much as 90% coverage of the surface area. Increased sludge wasting rates ranged from 14 to 20 minutes per cycle to maintain the MLSS concentrations and F:M ratio within the desired goals. Aeration time was increased to a minimum of 230 minutes to provide for a total of approximately 63% of aeration during the 360 minute treatment cycle. The extended aeration period assists to offset the oxygen demand after extended periods of idle time between treatment cycles.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 5 of 9

Big Fish Environmental Services Inc.

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was slightly decreased from a daily average of 92 gpd during July to 80 gpd during August to assist with total phosphorus removal. The aluminum sulfate dosages prior to filtration remained constant during June and July. The increase in alum addition, as well as the increased idle times, resulted in an increase in soda ash addition. During August, the soda ash addition average decreased slightly to approximately 416 lbs./day, as compared to 466 lbs./day during July. Soda ash assists towards maintaining pH concentrations above 7.0 standard units continued during the month.

SBR No. 2 remains out of service as a treatment unit, however, partially filled with MLSS which continuously mixed and aerated.

Flow data: July 2014

Flow Meter Location Total Volume for Month, MGD Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building Meter was O/S Flow meter failed on July 16, 2014 ND ND
Influent Wastewater to SBRs 11.819 381,275 476,320
Internal Recycle ND ND ND
Treated Effluent to Disc Filters 11.254 363,062 440,096
Final Effluent Discharge 5.965 192,419 250,000
Applebrook Golf Course 4.265 137,588 161,288

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 6 of 9

Big Fish Environmental Services Inc.

Chemical Usage: July 2014

Chemical Daily Average Total Monthly
Soda Ash 456 14,150
Magnesium Hydroxide 0 0
Aluminum Sulfate solution 2,842 92
Polymer (centrifuge) 8.1 130

*Sixteen (16) days of centrifuge operation

Solids Dewatering and Disposal: July 2014

Sludge Dewatering Summary Value
Gallons of sludge dewatered 356,092
Average Dewatered Total Solids, % 20.0%
Wet Tons 31.94
Dry Tons 6.375
Number of dumpsters 4

*A total of four (4) dumpsters were filled and four (4) dumpsters were removed during July.

Flow data: August 2014

Flow Meter Location Total Volume for Month, MGD Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building* 8.354* 309,393* 404,200*
Influent Wastewater to SBRs 11.564 358,435 490,336
Internal Recycle 1.807* 69,487* 154,420*
Treated Effluent to Disc Filters 11.112 358,435 490,336
Final Effluent Discharge 5.959 192,226 235,000
Applebrook Golf Course 4.054 130,757 151,900

*The influent flow meter data represents 27 days of flow measurements. The flow meter was repaired on August 3, 2014

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 7 of 9

Big Fish Environmental Services Inc.

Chemical Usage: August 2014

Chemical Daily Average Total Monthly
Soda Ash 12,450 416
Magnesium Hydroxide 0 0
Aluminum Sulfate solution 2,469 80
Polymer (centrifuge) 6.95 139

*Twenty (20) days of centrifuge operation

Solids Dewatering and Disposal: August 2014

Sludge Dewatering Summary Value
Gallons of sludge dewatered 381,135
Average Dewatered Total Solids, % 19.9%
Wet Tons 41.01
Dry Tons 8.161
Number of dumpsters 5

*A total of five (5) dumpsters were filled and five (5) dumpsters were removed during August.

During August, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of the month was 10.53 feet and the level at the end of the month was 8.12 feet. The initial total solids concentration was 0.72% and ended the month as 0.75% total solids. The average pH concentration was 7.15 S.U. and total alkalinity of 232 mg/L. A total of 59,040 gallons of supernatant was decanted during the month. A total of 600 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 7.03 feet and the level at the end was 10.61. The initial total solids concentration were 0.72% and ended the month as 0.63% total solids. The average pH concentration was 7.17 S.U. and total alkalinity of 216 mg/L. A total of 77,280 gallons of supernatant were decanted during the month. A total of 650 pounds of soda ash were added during the month for pH adjustment.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 8 of 9

Big Fish Environmental Services Inc.

Significant Storm/Hydraulic Loading Events

During August 11th through the morning of the 12th, 1.40 inches of rainfall were recorded at the facility. There were no issues as a result of the rainfall on the treatment process.

Minor Repairs and Preventative Maintenance

  • Installed replacement level transducers for sludge holding tank number 2.
  • ACS was contacted and provided information, including photographs, of the level transducers for post flow equalization tank number 2. The replacement transducer is anticipated during early September.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 9 of 9

Discussion of the Ridley Creek Sewage Treatment Plant SBR Influent Ammonia as Nitrogen Loading Rates.

September 5, 2014

Summary

The Ridley Creek Sewage Treatment Plant (RCSTP) influent ammonia as nitrogen data during the period of January 2013 through July 2014 was reviewed for comparison with the SBR design criteria. The data reviewed consisted of the influnet monthly avaerage and weekly maximum concentration expressed as mg/L and loading expressed as lbs/day were reviewed. The monthly avaerage concentration of 31.3 mg/L is within the design concentration of 32 mg/L. There were several months that exceeded the design concentration of 32 mg/L as well as several which were below. The loading rates expressed as lbs./day remain well below the design loading artes for the SBR. Although the influent ammonia as nitrogen variability ofeten exceeds the design basis for the SBR, the final effluent ammonia as nitrogen concentration has remianed witthin compliance with the seasonal discharge limitations. Table 1 presents the data reviewed. Additionally, Figure 1 presents a trend of the influent concentrations and fugure 2 pressenta the trend of loading rates.

Table 1: Ridley Creek Sewage Treatment Plant Ammonia as Nitrogen, mg/L

Month Year Design, mg/L Design, lbs/day Monthly Average, mg/L Weekly Maximum, mg/L Monthly Average, lbs/day Weekly Maximum, lbs/day
January 2013 32 200 36.3 40.7 110 128
February 2013 32 200 35 45.7 116 175
March 2013 32 200 30.5 35.5 128 161
April 2013 32 200 32.9 38 96.9 115
May 2013 32 200 32.7 47.6 93.5 150
June 2013 32 200 33.9 36.2 123 138
July 2013 32 200 36.3 40.7 110 128
August 2013 32 200 31.3 34.3 95.8 114
September 2013 32 200 34.5 35.4 101 110
October 2013 32 200 32.1 37.8 98.8 131
November 2013 32 200 29.6 32.9 89.5 128
December 2013 32 200 30.7 38.1 99.1 129
January 2014 32 200 31.5 36.8 107 123
February 2014 32 200 25.7 34 96.6 116
March 2014 32 200 25.3 27.4 93.9 111
April 2014 32 200 25.2 35.2 128 172
May 2014 32 200 24.4 29.9 82.3 109
June 2014 32 200 32.9 34.7 121 143
July 2014 32 200 34.1 36.2 102 119
Average 31.3 36.7 105 132
Maximum 36.3 47.6 128 175

Figure 1

Influent Ammonia as N concentration, mg/L ; January 2013 through July 2014

Line chart showing monthly Influent Ammonia as N concentration (mg/L) compared to the Design concentration (32 mg/L) from January 2013 through July 2014.

  • Y-Axis (Ammonia as N, mg/L): 0, 5, 10, 15, 20, 25, 30, 35, 40
  • X-Axis (Month): January, March, May, July, September, November, January, March, May, July
  • Legend: Influent Ammonia as N, mg/L; Design, mg/L

Figure 2

Influent Ammonia as Nitrogen loading, lbs/day - January 2013 through July 2014

Line chart showing monthly Influent Ammonia as Nitrogen loading rate (lbs/day) compared to the Design Loading rate (200 lbs/day) from January 2013 through July 2014.

  • Y-Axis (Ammonia as nitrogen, lbs/day): 0, 50, 100, 150, 200, 250
  • X-Axis (Month): January, February, March, April, May, June, July, August, September, October, November, December, January, February, March, April, May, June, July
  • Legend: Influent loading rate, lbs/Day; Design Loading rate

2013 FLOWMETERS

2014 AUGUST 3RD QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT GPD NET FLOWS
0.25 08/01/14
0.15 08/02/14
0.05 08/03/14
0.00 08/04/14 1,770,591 872000 6,003,133 85,243 3,601,804 55,430 2,179,134 51,010 24,000 680,318
0.00 08/05/14 1,771,508 917000 6,011,317 81,840 3,607,226 54,220 2,187,189 80,550 24,000 700,390
0.03 08/06/14 1,772,392 884000 6,019,266 79,490 3,612,430 52,040 2,193,608 64,190 24,000 688,280
0.00 08/07/14 1,773,289 897000 6,027,166 79,000 3,617,803 53,730 2,199,776 61,680 24,000 702,590
0.00 08/08/14 702,590
0.00 08/09/14 702,590
0.00 08/10/14 702,590
0.00 08/11/14 1,776,675 846500 6,059,567 81,003 3,638,907 52,760 2,217,422 44,115 24,000 668,623
1.38 08/12/14 668,623
0.05 08/13/14 1,778,622 973500 6,081,180 108,065 3,650,941 60,170 2,232,004 72,910 24,000 732,355
0.30 08/14/14 1,779,587 965000 6,090,395 92,150 3,656,687 57,460 2,239,727 77,230 24,000 738,160
0.00 08/15/14 738,160
0.00 08/16/14 738,160
0.00 08/17/14 738,160
0.00 08/18/14 1,783,149 890500 6,126,293 89,745 3,678,844 55,393 2,260,233 51,265 24,000 694,098
0.00 08/19/14 1,784,076 927000 6,134,812 85,190 3,684,553 57,090 2,267,418 71,850 24,000 712,870
0.00 08/20/14 712,870
0.00 08/21/14 1,785,892 908000 6,150,924 80,560 3,695,241 53,440 2,284,634 86,080 24,000 687,920
0.00 08/22/14 1,786,785 893000 6,158,944 80,200 3,700,538 52,970 2,293,229 85,950 24,000 673,880
0.40 08/23/14 673,880
0.00 08/24/14 673,880
0.00 08/25/14 673,880
0.00 08/26/14 673,880
0.00 08/27/14 673,880
0.00 08/28/14 1,792,135 891666 6,207,646 81,170 3,734,365 56,378 2,333,656 67,378 24,000 686,739
0.00 08/29/14 1,792,993 858000 6,214,970 73,240 3,739,670 53,050 2,340,477 68,210 24,000 663,500
0.00 08/30/14
1.00 08/31/14
4.03 Day Avg 901,782 84,377 54,933 67,878 24,000 696,264
Day Count 13 13 13 13 13 26
EG TWP Value
MONTH TO DATE 4.03
NORMAL MONTH TO DATE
YEAR TO DATE 38.68
NORMAL YEAR TO DATE

f:/data/users/joanna/ 2003 flowmeters | 9/3/2014 1:55 PM

2013 FLOWMETERS

2013 AUGUST 3RD QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

DATE HERSHEY'S MILL READING HERSHEY'S MILL GPD ASHBRIDGE READING ASHBRIDGE GPD HICKS METER READING HICKS METER GPD RESERVOIR READING RESERVOIR GPD BARKWAY READING BARKWAY GPD
08/01/14
08/02/14
08/03/14
08/04/14 18,006,718 570,785 1,949,677 54,780 14,019,465 204,790 53,702,694 579,690 3,308,182 8,973
08/05/14 18,058,810 520,920 1,950,211 53,400 14,045,183 257,180 53,766,573 638,790 3,309,045 8,630
08/06/14 18,115,166 563,560 1,950,759 54,800 14,068,683 235,000 53,826,673 601,000 3,309,924 8,790
08/07/14 18,170,844 556,780 1,951,324 56,500 14,093,402 247,190 53,888,460 617,870 3,310,773 8,490
08/08/14
08/09/14
08/10/14
08/11/14 18,390,174 548,325 1,953,443 52,975 14,173,787 200,963 54,110,245 554,463 3,314,419 9,115
08/12/14
08/13/14 18,502,950 563,880 1,954,616 58,650 14,225,524 258,685 54,245,902 678,285 3,316,356 9,685
08/14/14 18,557,870 549,200 1,955,177 56,100 14,252,616 270,920 54,313,835 679,330 3,317,306 9,500
08/15/14
08/16/14
08/17/14
08/18/14 18,769,886 530,040 14,340,694 220,195 54,550,339 591,260 3,320,879 8,933
08/19/14 18,827,542 576,560 1,957,918 54,820 14,366,946 262,520 54,614,788 644,490 3,321,910 10,310
08/20/14
08/21/14 18,938,924 556,910 1,959,009 54,550 14,419,912 264,830 54,741,564 633,880 3,323,869 9,795
08/22/14 18,992,678 537,540 1,959,526 51,700 14,445,027 251,150 54,802,980 614,160 3,324,790 9,210
08/23/14
08/24/14
08/25/14
08/26/14
08/27/14
08/28/14 19,318,832 543,590 1,962,787 54,350 14,585,826 234,665 55,160,128 595,247 3,330,504 9,523
08/29/14 19,368,010 491,780 1,963,288 50,100 14,610,694 248,680 55,219,264 591,360 3,331,385 8,810
08/30/14
Day Avg 546,913 54,394 242,828 616,910 9,213
Day Count 13 12 13 13 13

9/3/20141:55 PM

f:/data/users/joanna/ 2003 flowmeters

2014 SUMMARY OF METER READINGS

MONTH WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR BARKWAY
JANUARY 1,120,955 112,631 63,436 80,890 24,000 255,116 795,376
FEBRUARY 1,249,173 138,449 68,472 88,803 24,000 287,831 881,433
MARCH 1,182,533 126,933 67,479 84,197 24,000 860,074 75,186 291,520 827,109 28,696
APRIL 1,242,798 143,329 76,736 88,674 24,000 1,029,229 79,139 300,256 806,253 12,331
MAY 1,542,161 175,112 95,766 94,501 24,000 1,337,536 117,391 357,808 937,139 20,786
JUNE 1,117,632 118,019 66,596 96,366 24,000 718,059 68,339 287,327 744,579 11,081
JULY 965,691 100,935 55,946 86,968 24,000 613,087 57,604 261,340 676,846 9,610
AUGUST 901,782 84,377 54,933 67,878 24,000 546,913 54,394 242,828 616,910 9,213
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave 1,165,341 124,973 68,671 86,035 24,000 850,816 75,342 285,503 785,706 15,286

To West Goshen 885,662

2014 flowmeters -all-stations separate month worksheets.xlsxSUMMARY

2014 SUMMARY OF METER READINGS

MONTH WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT
JANUARY 1,120,955 112,631 63,436 80,890 24,000
FEBRUARY 1,249,173 138,449 68,472 88,803 24,000
MARCH 1,182,533 126,933 67,479 84,197 24,000
APRIL 1,242,798 143,329 76,736 88,674 24,000
MAY 1,542,161 175,112 95,766 94,501 24,000
JUNE 1,117,632 118,019 66,596 96,366 24,000
JULY 965,691 100,935 55,946 86,968 24,000
AUGUST 901,782 84,377 54,933 67,878 24,000
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave 1,165,341 124,973 68,671 86,035 24,000

Flowmeters August 2014

Line chart with diamond data markers showing daily net flowmeter values (Flow's) for August 2014 across days 1 through 30 of the month.

  • Y-Axis (Flow's): 620000, 640000, 660000, 680000, 700000, 720000, 740000, 760000
  • X-Axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
  • Legend: August

Monthly Totals 2012 Jan-Dec

Bar chart showing Flowmeters (ranging from 0 to 2,500,000 on the vertical axis) by Month (January through December on the horizontal axis).

August Precip. 4.03 - 2014

Bar chart showing daily precipitation (precip.) in inches for August 2014.

  • Y-Axis (precip.): 0, 0.2, 0.4, 0.6, 0.8, 1, 1.2, 1.4
  • X-Axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
  • Legend: August

2013 Monthly Precipitation

Bar chart showing monthly precipitation (Series1, ranging from 0 to 8 on the vertical axis) from January through December.

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 11, 2014

The East Goshen Township Municipal Authority held their regular public meeting on Monday, August 11, 2014 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Kevin Cummings, Dana Pizarro, Ed McAssey and Fran Beck. Also in attendance were: Rick Smith (Township Manager), Bob Adams (Attorney), and Mike Ellis (Pennoni).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA– Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response.

Chairman's Report/Other Members' Reports

Jack attended the West Goshen meeting which was mostly about inspections of Goose Creek. Dana will attend the PMA Conference at the end of the month.

Sewer Reports

1. Director of Public Works

Mark Miller reported for July 2014:

Meters: All meters were read on a daily basis. We were finally able to install the portable flow meters at the locations that Mike Ellis suggested.

CC Collection: We cleaned and televised 11,200 feet of sewer lines in July. The pumps that we pulled were rebuilt by Deckmen Electric and put back on the shelves. Pumping stations were visited on a daily basis with no problems to report.

RC Collection: The Hunt Country pump station was visited on a routine basis. We cleaned and televised 12,800 feet of pipe, several sags were found and two sections of pipe were crushed. We replaced 180 feet of 8" pipe.

RC Plant: The emergency generator was utilized several times this month at the plant and the pumping stations.

Alarms: We responded to 15 alarms for the month of July.

PA One Calls: We received 97 PA calls in July.

Emergency Call: 17 emergency call outs for the month of July, two were for lateral blockages, the rest were alarms due to the storms.

Rick added that they started the extension to Wylpen.

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 8-11-14 draft.doc

1

2. Pennoni Engineer's Report

Mike Ellis gave the following report:

Invoices: Invoices with summaries are provided under separate cover.

Reservoir Rd Pump Station Act 537 Plan: We prepared updated hard and electronic copies of the Act 537 plan for public review. The 30-day public comment period began on July 14 and will end on August 14.

We received Act 537 Plan review forms from the Chester Co. Planning Commission and an approval letter from the West Goshen Sewer Authority. The only outstanding agency consistency review is from West Goshen Township Planning Commission. Reviews were due by July 9.

It is our understanding that Conestoga-Rovers & Assocs. resubmitted revised plans to USFWS around July 10 to address their bog turtle protection comments at the Chester Creek crossing. We are awaiting USFWS approval.

We notified the Township of an open grant application from PA DCED that funds Act 537 Plans, for which this project would be eligible.

Tentative Act 537 Planning schedule:

Milestone Estimated Date
End 30-day public comment period August 12, 2014
USFWS Bog Turtle Habitat formal approval by August 21,2014?
East Goshen Twp. Adoption August 19, 2014
Submission to PADEP August 22, 2014
PADEP Review and Approval (120 Days) December 21, 2014

Reserve Pump Station Elimination – The contractor was notified that grass is not growing in well in the former driveway location. We are still awaiting resubmission of as-built plans with surveyed manhole elevations also. The contractor responded that as-built plans will be submitted and additional topsoil and seed will be placed by August 14.

New Sewer Connections

We reviewed the final revised design plans and report submission for a new private wastewater pump station for Acero Precision at 1340 Enterprise Dr and issued a final comment letter.

We reviewed shop drawings for the sanitary sewer extension at Sunny Ridge Farm (Cornwallis Dr) and communicated comments and revisions with the developer's contractor.

Rick added that Richard Jackson, resident, called with questions about the Reservoir Road Pump Station.

3. Big Fish Environmental Services

The following is Scott's report for June & July 2014:

Treatment Process Operation June 2014- During May 2014, there were no exceedances of the final effluent discharge limitations for outfall 001 and no discharge from Outfall 002. The monthly average total phosphorus concentration was 0.26 mg/L as compared to the discharge limitation of 0.5 mg/L.

During the month, the final effluent total phosphorus concentration discharged ranged from 0.20 mg/L to 0.32 mg/L with an average of 82.6 gallons per day of aluminum sulfate solution.

There was no discharge to Applebrook, Outfall 002, during May 2014. During June 2014, 138,000 gallons were discharged to Applebrook.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 8-11-14 draft.doc

2

at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Sequencing batch reactors (SBRs) 1, 3 and 4 were in service during the month of June. Process monitoring of each SBR included ammonia as N, Nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remain reduced during the month of June. Adjustments to the treatment process to maintain the MLSS concentrations and the F:M ratio within the target range of 0.045 to 0.06 were ongoing during the month. Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample total phosphorus is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was increased from a daily average of 82.6 gpd during May to 101 gpd during June to assist with total phosphorus removal. Increased aluminum sulfate dosages prior to filtration were increased during the month. The increase in alum addition resulted in an increase in soda ash addition. During May the daily average soda ash addition was 439 lbs/day as compared to the June daily average of 500 lbs/day. SBR #2 remains out of service as a treatment unit

Solids Dewatering and Disposal: May 2014

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank #1 was in service. The level at the beginning of the month was 7.44 feet and the level at the end of the month was 11.72 feet. The initial total solids concentration was 0.62% and ended the month as 0.73% total solids. The average pH concentration was 7.30 S.U. and total alkalinity of 386 mg/L. No supernatant was decanted during the month. A total of 1,000 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank #2 was in service. The level at the beginning of the month was 14.39 feet and the level at the end of the month was 13.99 feet. The initial total solids concentration was 0.97% and ended the month as 0.80% total solids. The average pH concentration was 7.38 S.U. and total alkalinity of 490 mg/L. 83,626 gallons of supernatant were decanted during the month. A total of 100 pounds of soda ash were added during the month for pH adjustment.

Significant storm/hydraulic Loading Events – None were experienced past May 2, 2014.

Minor Repairs and Preventive Maintenance

No minor repairs or preventative maintenance was performed during June 2014.

Treatment Process Operation July 2014- During June 2014, there were no exceedances of the final effluent discharge limitations for outfall 001 and no discharge from Outfall 002. The monthly average total phosphorus concentration was 0.28 mg/L as compared to the discharge limitation of 0.5 mg/L.

During the month, the final effluent total phosphorus concentration discharged ranged from 0.56 mg/L to 0.10 mg/L with a daily average of 101 gallons as compared to the month of May daily average of 83 gallons per day of aluminum sulfate solution.

A total of 138,000 gallons of treated effluent were discharged to Applebrook, Outfall 002, on June 30, 2014. The influent loadings remained within the treatment facility design loadings.

There are no anticipated exceedances of the permitted limitations for the month of July. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results. The final effluent total phosphorus collected on July 22, 2014 appears to have a sampling or laboratory analysis error. The initial concentration

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 8-11-14 draft.doc

3

reported is 2.1 mg/L, whereas, all process monitoring, final effluent quality and comparative sample analysis indicates the concentration should be less than 0.5 mg/L. The laboratory was instructed to retest the sample as it remains within the 30 day holding period. The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remain stable at approximately 15 to 25% coverage of the surface area during the month of July. Increase sludge wasting rates ranged from 14 to 18 minutes per cycle to maintain the MLSS concentrations and F:M ratio within the desired goals. Aeration time was increased to a minimum of 210 minutes to provide for a total of approximately 58% of aeration during the 360 minute treatment cycle. The extended aeration period assists to offset the oxygen demand after extended periods of idle time between treatment cycles.

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was increased from a daily average of 82.6 gpd during May to 101 gpd during June to assist with total phosphorus removal. The daily average for the month of July decreased slightly o approx. 93 gpd (as of 7/29/14). The aluminum sulfate dosages prior to filtration remained constant during June & July. The increase in alum addition, as well as the increased idle times, resulted in an increase in soda ash addition. During June the daily average soda ash addition was 500 lbs/day as compared to the May daily average of 439 lbs/day. During July, he soda ash addition average decreased slightly to approx. 466 lbs/day. Soda ash assists towards maintaining pH concentrations above7.0 standard units continued during the month.

SBR #2 remains out of service as a treatment unit, however, partially filled with MLSS which continuously mixed and aerated.

The decanter for SBR 3 was occasionally observed as being slightly tilted within the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The SBR is planned for removal from service during mid-August for inspection.

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank #1 was in service. The level at the beginning of the month was 11.69 feet and the level at the end of the month was 15.14 feet. The initial total solids concentration was 0.71% and ended the month as 0.64% total solids. The average pH concentration was 7.12 S.U. and total alkalinity of 254 mg/L. A total of 92,421 gallons of supernatant was decanted during the month. A total of 1,350 lbs. of soda ash were added during the month for pH adjustment.

Sludge holding tank #2 was in service. The level at the beginning of the month was 15.21 feet and the level at the end of the month was undetermined due to a failed level transducer. A replacement transducer was obtained and is scheduled for delivery to the facility for installation

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 8-11-14 draft.doc

4

during the week of Aug. 4, 2014. The initial total solids concentration was 0.81% and ended the month as 1.04% total solids. The average pH concentration was 6.96 S.U. and total alkalinity of 381 mg/L. A total of 290,230 gallons of supernatant were decanted during the month. A total of 1,350 lbs. of soda ash were added during the month for pH adjustment.

Significant Storm/Hydraulic Loading Events – None during June 2014

Minor Repairs & Preventive Maintenance

  • Gained approval to order replacement level transducers for post flow equalization tank #2 and sludge holding tank #2. Spare transducers were included for inventory.
  • July 1 Township staff reinstalled influent pump #3. All three influent pumps were rebuilt by Deckman Electric during 2014.
  • July at replaced failed UV ballast for bank #2, module 1-2.
  • July 21 replaced final effluent sample suction tubing.
  • July 23 replaced the oil in SBR blower #5. Blower hours are 9,676.2.
  • July 23 trouble shoot influent pump controls. Influent pump control panel failed during routine generator exercising. Determined failed battery in the UPS surge protection device. Replaced surge protector device with unit from the laboratory.
  • July 27 replaced the grease for the sludge holding tank and post flow equalization blower. The hours are listed: B1A – 86,352.1 hrs; B1B – 72,962.3 hrs; B1C – 12,655.7 hrs; B2 - 54,983.5 hrs.

Dana commented about the TKN concentration in June & July. Rick will talk to Scott about it.

Ed pointed out that putting zeroes in a spreadsheet changes the average number.

Approval of Minutes

Dana moved to accept the minutes of July 14, 2014 as corrected. Fran seconded the motion. The motion passed unanimously.

Dana moved to accept the minutes of the July 21, 2014 special meeting as corrected. Ed seconded the motion. The motion passed unanimously.

Approval of Invoices

  1. Pennoni – Supplemental Funds Request #2 – For the Reservoir Road project, Pennoni is requesting an additional $3,000.00 as a supplement to the approved Phase 3 budget. Dana moved to approve this supplement of $3,000.00 to the Phase 3 Budget. Fran seconded the motion. The motion passed unanimously. Mike noted that $878.08 of the supplement is included in Invoice #601105.
  2. Dana moved to approve payment of the following Pennoni invoices: a. Pennoni #599630 $476.75; b. Pennoni #599632 $141.25; c. Pennoni #599633 $28.25; d. Pennoni #601105 $1,208.75. Fran seconded the motion. The motion passed unanimously.
  3. Kevin moved to approve payment of the Gawthrop invoice #122295 for $80.00. Dana seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 8-11-14 draft.doc

5

Financial Reports

  1. The report was reviewed.

Goals

  1. Ed will attend the West Goshen September meeting.

Adjourment

There being no further business, Kevin moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:22 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 8-11-14 draft.doc

6

INVOICE

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 603380
Invoice Date : 08/20/2014
Project : EGMA1306
Project Name : Reserve PS Diversion Construction

For Services Rendered through: 8/10/2014

Continued coordination with contractor for punchlist work: Sr. Engineering Technician performed on-site observation of status of grass growth at former pump station driveway; and Authority Engineer notified contractor of need for additional grass restoration and submission of as-built plans.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Amount
Labor : 111.25
Expense : 0.00
Phase Total : 111.25
Amount Due This Invoice $111.25
Billing Category Amount
Fee : 20,000.00
Prior Billings : 15,843.25
Current Billings : 111.25
Total Billings : 15,954.50

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 0.25 113.00 28.25
Senior Engineering Technician 1.00 83.00 83.00
Labor Total: 1.25 111.25
Summary Type Amount
Total Phase : **** -- Professional Services Labor : $111.25
Expense : $0.00
Total Project : EGMA1306 -- Reserve PS Diversion Construction Labor : $111.25
Expense : $0.00

[Signature: ok RS 9-5]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1306 Invoice Summary
Invoice Date 08/20/2014

Field Value Extra Extra Value
Project: EGMA1306
Pennoni Job No.: Reserve PS Diversion Construction P
Invoice No: 603380
Invoice Period: 7/14/2014 to 8/10/2014
Initial Authorization: $ 20,000.00 Date: 8/20/2014
Contract Amount: $ 20,000.00
Previously Invoiced: $ 15,843.25
Current Invoice: $ 111.25
Invoiced to Date ($): $ 15,954.50
Invoiced to Date (%): 80%
Remaining Budget ($): $ 4,045.50
Remaining Budget (%): 20%

Budget by Phase:

Phase Name: Reserve PS Diversion Construction Phase
Phase Budget: $ 20,000.00
Previously Invoiced: $ 15,843.25
Current Invoice: $ 111.25
Invoiced to Date ($): $ 15,954.50
Invoiced to Date (%): 80%
Remaining Budget ($): $ 4,045.50
Remaining Budget (%): 20%

Comments: Continued coordination with contractor for punchlist work: Sr. Engineering Technician performed on-site observation of status of grass growth at former pump station driveway; and Authority Engineer notified contractor of need for additional grass restoration and submission of as-built plans.

INVOICE

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 603381
Invoice Date : 08/20/2014
Project : EGMA1307
Project Name : Reservoir Rd PS Act 537 Planning

For Services Rendered through: 8/10/2014

Assembled hard copies and electronic copies of Act 537 report and plans for 30-day public review, issued copies to Township, and set up electronic copy on Dropbox website.

Phase : 03 -- Act 537 Plan Update

Total Phase : 03 -- Act 537 Plan Update Amount
Labor : 753.75
Expense : 0.00
Phase Total : 753.75

Phase : 04 -- Additonal Meetings

Total Phase : 04 -- Additonal Meetings Amount
Labor : 27.50
Expense : 0.00
Phase Total : 27.50
Amount Due This Invoice $781.25

[Signature: ok RS 9-5]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning | Invoice # : 603381

...Continued from previous page

Phase : 03 -- Act 537 Plan Update

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.75 110.00 302.50
Project Engineer 4.75 95.00 451.25
Labor Total: 7.50 753.75
Summary Type Amount
Total Phase : 03 -- Act 537 Plan Update Labor : $753.75
Expense : $0.00

Phase : 04 -- Additonal Meetings

Labor

Class Hours/Units Rate Amount
Authority Engineer 0.25 110.00 27.50
Labor Total: 0.25 27.50
Summary Type Amount
Total Phase : 04 -- Additonal Meetings Labor : $27.50
Expense : $0.00
Total Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning Labor : $781.25
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. | Page: 2

East Goshen Municipal Authority
EGMA1307 Invoice Summary
Invoice Date 08/20/2014

Field Value Extra Extra Value
Project: EGMA1307
Pennoni Job No.: Reservoir Rd PS Act 537 Planning
Invoice No: 603381
Invoice Period: 7/14/2014 to 8/10/2014
Initial Authorization: $ 77,400.00 Date: 8/20/2014
Contract Amount: $ 87,900.00
Previously Invoiced: $ 71,494.25
Current Invoice: $ 781.25
Invoiced to Date ($): $ 72,275.50
Invoiced to Date (%): 82%
Remaining Budget ($): $ 15,624.50
Remaining Budget (%): 18%

Budget by Phase:

Phase Name: Reservoir Rd PS Act 537 Planning
Phase Budget: $ 87,900.00
Previously Invoiced: $ 71,494.25
Current Invoice: $ 781.25
Invoiced to Date ($): $ 72,275.50
Invoiced to Date (%): 82%
Remaining Budget ($): $ 15,624.50
Remaining Budget (%): 18%

Comments: Assembled hard copies and electronic copies of Act 537 report and plans for 30-day public review, issued copies to Township, and set up electronic copy on Dropbox website.

INVOICE

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 603382
Invoice Date : 08/20/2014
Project : EGMA1401
Project Name : 2014 General Services

For Services Rendered through: 8/10/2014

Attended July Municipal Authority meeting, prepared August Engineer's Report, researched PA DCED grant application for Act 537 Planning and coordinate with Township Manager to prepare application for Reservoir Road PS project, and reviewed developer's request to connect 44 EDU's to Ridley Creek sewers from within Willistown Twp.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Amount
Labor : 556.00
Expense : 0.00
Phase Total : 556.00
Amount Due This Invoice $556.00
Billing Category Amount
Fee : 10,300.00
Prior Billings : 7,242.50
Current Billings : 556.00
Total Billings : 7,798.50

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 4.50 113.00 508.50
Project Engineer 0.50 95.00 47.50
Labor Total: 5.00 556.00
Summary Type Amount
Total Phase : **** -- Professional Services Labor : $556.00
Expense : $0.00
Total Project : EGMA1401 -- 2014 General Services Labor : $556.00
Expense : $0.00

[Signature: ok RS 9-5]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 08/20/2014

Project:EGMA1401
Pennoni Job No.:2014 General Services
Invoice No:603382
Invoice Period:7/14/2014to8/10/2014
Initial Authorization:$ 10,300.00Date:8/20/2014
Contract Amount:$ 10,300.00
Previously Invoiced:$ 7,242.50
Current Invoice:$ 556.00
Invoiced to Date ($):$ 7,798.50
Invoiced to Date (%):76%
Remaining Budget ($):$ 2,501.50
Remaining Budget (%):24%

Budget by Phase:

Phase Name:2014 General Services
Phase Budget:$ 10,300.00
Previously Invoiced:$ 7,242.50
Current Invoice:$ 556.00
Invoiced to Date ($):$ 7,798.50
Invoiced to Date (%):76%
Remaining Budget ($):$ 2,501.50
Remaining Budget (%):24%

Comments: Attended July Municipal Authority meeting, prepared August Engineer's Report, researched PA DCED grant application for Act 537 Planning and coordinate with Township Manager to prepare application for Reservoir Road PS project, and reviewed developer's request to connect 44 EDU's to Ridley Creek sewers from within Willistown Twp.

Memo

To: Municipal Authority
From: Jon Altshul
Re: 2015 Municipal Authority Proposed Budget
Date: September 5, 2014

Attached please find a proposed 2015 budget for the Municipal Authority.

Revenues

  • This budget proposes revenues of $121,016, including $105,105 as a transfer from the sewer operating fund and $14,296 from two Ridley Creek tap-in fees on Colonial Lane.

Expenses

  • Expenses reflect $9,000 for legal fees and $37,300 for engineering, of which $12,000 is anticipated for general engineering, $10,500 for I&I reports and $14,800 for Chapter 94 reports.
  • The remaining expenses include $10,800 for auditing, $33,323 for administrative overhead, and $27,409 for the Municipal Authority's share of debt service on the 1998 notes.
  • No capital expenses are anticipated in 2015.

The projected fund balance at the end of 2015 is expected to be $1,570,894, the majority of which represents the remaining balance of the proceeds from the 2013 notes.

I recommend that the Municipal Authority approve the proposed budget prior to the end of the calendar year.

Municipal Authority

Account TitleAcct #2011 Actual2012 Actual2013 Actual2014 Budget2014 Budget2014 Y/E Projection2015 Budget
REVENUE
INTEREST EARNINGS07341 1000(4)232816272715
INTEREST EARNED - RCSTP EXPANSION07341 1020478764091,1672,0001,5731,600
C.C. TAPPING FEES07364 1100--20072,333124,000124,000
R.C.TAPPING FEES07364 11102,7154,00013,29212,50921,44421,44414,296
CONNECTION FEES - SEWER07364 11301,1308461,690--1,128
MISCELLANEOUS REVENUE07380 10001,778423423--564
TRANSFER FROM SEWER OPERATING07392 0500151,00071,76688,000--21,000105,105
TRANSFER FROM SEWER CAP RESERVE07392 090026,094450,000662,000---
LOAN PROCEEDS-SEWER PROJECT07393 1001--2,477,000---
TOTAL REVENUE183,191527,1333,243,04286,025147,471169,736121,016
EXPENSES
ADMINISTRATIVE WAGES07424 140033,56833,56831,92116,38432,76832,76833,323
MISCELLANEOUS EXPENSE07424 30001,8359501,6902,3334,0004,0003,000
MUNIC.AUTH.-AUDITING07424 311013,0007,9008,10010,80010,80010,80010,984
ENGINEERING SERVICES07424 313037,13134,06340,58420,72335,52535,52537,300
LEGAL SERVICES07424 31406,8207,16512,2134,0837,0007,0009,000
R.C. CAPITAL-STP07424 74407,579----
R.C. CAPITAL - COLLECTION07424 74501,968----
R.C.-CAP. PROJ.-ENGINEER07424 7451117,726----
R.C. CAP EXPANSION GEN'L CONTRACTOR07424 7452250,324----
R.C. CAP EXPANSION - ELECTRICAL07424 7453270,0361,228---
R.C. CAP EXP CONTINGENCY CAPITAL07424 745434,279----
LOCHWOOD ABANDONMENT ENGINEER07424 747556,44744,1115,563--
LOCHWOOD ABANDONMENT CONSTRUCTION07424 7476-177,28149,796--
LOCHWOOD ELIMINATION PHASE 207424 7477-105,98712,166--
MARYDELL PUMP STATION - ENGINEER07425 10003,31717,96251,304--
MARYDELL PUMP STATION -CONSTRUCTION07425 2000--228,317--
HERSHEY MILL STATION - ENGINEER07426 10004,08124,64625,350--
HERSHEY MILL STATION - CONSTRUCTION07426 2000--167,013--
RESERVE PUMP STATION - ENGINEER07427 10004,08122,19633,730--4,784
RESERVE PUMP STATION - CONSTRUCTION07427 2000--96,740--
RESERVOIR PUMP STATION - ENGINEER07428 10001,49435838,44743,75075,00075,000
M.C.-DVRFA-DEBT SERVICE07471 100018,48019,60020,72022,12022,12022,12023,240
M.C.-DVRFA-INTEREST PAYMN07472 10007,7646,8426,0035,1155,1155,1154,169
TRF TO SEWER SINKING FUND07492 0550--877,000--
TOTAL EXPENSES869,930503,8581,706,656125,309192,328197,112121,016
NET RESULT FROM OPERATIONS(686,739)23,2751,536,386(39,284)(44,857)(27,376)-

MUNICIPAL AUTHORITY

The Municipal Authority, which is a legally separate entity from the Township, is responsible for financing the construction, expansion and upgrade of the Township's sewage collection and treatment infrastructure.

2014 Adopted2014 Y/E Projection2015 Proposed
Starting Fund Balance1,598,2701,598,2701,570,894
Revenues147,471169,736121,016
Expenses192,328197,112121,016
Year-End Fund Balance1,553,4131,570,8941,570,894
  • $9,000 for legal expenses
  • $37,300 for engineering
  • No funds budgeted for capital projects

[Seal: Township of East Goshen, Chester County, Pennsylvania, Incorporated 1817]

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA July Financial Reports
Date: September 4, 2014

The Municipal Authority recorded $134 in revenues (interest) and $1,935 in expenses in August, a difference of -$1,801. The fund balance is now $1,596,497.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
August 2014

Account TitleAcct #Annual BudgetMonth To Date ActualYear To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE1,598,297.97
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION07341 10202,000.00132.271,056.88
GRANT REVENUE07392 08000.000.000.00
TOTAL REVENUE2,000.00132.271,056.88
EXPENSES
R.C.-CAP. PROJ.-ENGINEER07424 74510.000.000.00
R.C. CAP EXPANSION GEN'L CONTRACTOR07424 74520.000.000.00
R.C. CAP EXPANSION - ELECTRICAL07424 74530.000.000.00
R.C. CAP EXP CONTINGENCY CAPITAL07424 74540.000.000.00
R.C. CAP EXP CONTINGENCY ONGOING07424 74550.000.000.00
R.C. CAP EXP ADDITIONAL CONTINGENCY07424 74560.000.000.00
TRANSFER TO SEWER SINKING FUND07492 05500.000.000.00
TRANSFER TO AUTHORITY CAP FUND07492 09900.000.000.00
TOTAL EXPENSES0.000.000.00
RCSTP NET RESULT2,000.00132.271,056.88

U:\bmccool\2014\Municipal Authority\2014 - 08 - Municipal Authority Report.xlsx | Page 1 of 3 | 08/04/14

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
August 2014

Account TitleAcct #Annual BudgetMonth To Date ActualYear To Date Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS07341 100027.001.629.21
C.C. TAPPING FEES07364 1100124,000.000.0067,000.00
R.C.TAPPING FEES07364 111021,444.000.0010,288.80
CONNECTION FEES - SEWER07364 11300.000.001,127.52
MISCELLANEOUS REVENUE07380 10000.000.00564.48
TRANSFER FROM SEWER OPERATING07392 05000.000.0021,000.00
TOTAL REVENUE145,471.001.6299,990.01
EXPENSES
ADMINISTRATIVE WAGES07424 140032,768.000.0016,086.04
MISCELLANEOUS EXPENSE07424 30004,000.000.001,450.00
MUNIC.AUTH.-AUDITING07424 311010,800.000.0010,800.00
ENGINEERING SERVICES07424 313035,525.00169.5026,981.00
LEGAL SERVICES07424 31407,000.0080.005,840.00
M.C.-DVRFA-DEBT SERVICE07471 100022,120.000.000.00
M.C.-DVRFA-INTEREST PAYMN07472 10005,115.000.000.00
M.C.-DVRFA-INTEREST PAYMN07472 10100.000.000.00
TOTAL EXPENSES117,328.00249.5061,157.04
OPERATING NET RESULT28,143.00(247.88)38,832.97

U:\bmccool\2014\Municipal Authority\2014 - 08 - Municipal Authority Report.xlsx | Page 2 of 3 | 08/04/14

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
August 2014

Account TitleAcct #Annual BudgetMonth To Date ActualYear To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT07393 10010.000.000.00
TRANSFER FROM SEWER CAP RESERVE07392 09000.000.000.00
TOTAL REVENUE0.000.000.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER07425 10000.000.000.00
MARYDELL PUMP STATION -CONSTRUCTION07425 20000.000.000.00
MANHOLE COVER REPLACEMENTS07424.74050.000.000.00
C.C. CAPITAL - COLLECTION07424.74200.000.000.00
LOCHWOOD ABANDONMENT ENGINEER07424 74750.000.000.00
LOCHWOOD ABANDONMENT CONSTRUCTION07424 74760.000.000.00
LOCHWOOD ELIMINATION PHASE 207424 74770.000.000.00
HERSHEY MILL STATION - ENGINEER07426 10000.000.000.00
HERSHEY MILL STATION - CONSTRUCTION07426 20000.000.000.00
RESERVE PUMP STATION - ENGINEER07427 10000.00476.755,261.16
RESERVE PUMP STATION - CONSTRUCTION07427 20000.000.000.00
RESERVOIR PUMP STATION - ENGINEER07428 100075,000.001,208.7536,402.25
RESERVOIR PUMP STATION CONSTRUCTION07428 20000.000.000.00
TOTAL EXPENSES75,000.001,685.5041,663.41
CAPITAL NET RESULT(75,000.00)(1,685.50)(41,663.41)
MUNICIPAL AUTHORITY ENDING FUND BALANCE1,596,496.86

U:\bmccool\2014\Municipal Authority\2014 - 08 - Municipal Authority Report.xlsx | Page 3 of 3 | 08/04/14

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 1
MGRP18 run by BRIAN | 10 : 16 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07341-1000INTEREST EARNINGS0.00
1401JE410270.5802/04/14INTERESTINTEREST EARNED JANUARY 2014 07 FUND
0.000.58-0.58
1402413911.3303/04/14INTERESTINTEREST EARNED FEBRUARY 2014 07100.1000
0.001.33-1.91
1403418401.7104/01/14INTERESTINTEREST EARNED MARCH 2014 07 FUND
0.001.71-3.62
1404423211.2105/02/14INTERESTINTEREST EARNED APRIL 2014 07100.1000
0.001.21-4.83
1405427390.9006/02/14INTERESTINTEREST EARNED MAY 2014 07100.1000
0.000.90-5.73
1406432110.7507/01/14INTERESTINTEREST EARNED JUNE 2014 07100.1000
0.000.75-6.48
1407437161.1108/04/14INTERESTINTEREST EARNED JULY 2014 07 FUND
0.001.11-7.59
1408441021.6209/03/14INTERESTINTEREST EARNED AUGUST 2014 07100.1000
0.001.62-9.21
0.009.21-9.21
07341-1020INTEREST EARNED - RCSTP EXPANSION0.00
140141028137.3302/04/14INTERESTINTEREST EARNED JANUARY 2014 07 CONSTRUCTION FUND
0.00137.33-137.33
140241392123.5603/04/14INTERESTINTEREST EARNED FEBRUARY 2014 07 CONSTRUCTION FUND
0.00123.56-260.89
140341841136.0704/01/14INTERESTINTEREST EARNED MARCH 2014 07 CONSTRUCTION FUND
0.00136.07-396.96

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 2
MGRP18 run by BRIAN | 10 : 16 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07341-10201404JE42322131.4505/02/14INTERESTINTEREST EARNED APRIL 2014 CONSTRUCT.FUNDS
0.00131.45-528.41
140542740134.5906/02/14INTERESTINTEREST EARNED MAY 2014 07 FUND - CONSTRUCTION
0.00134.59-663.00
140643212129.0007/01/14INTERESTINTEREST EARNED JUNE 2014 07 CONSTRUCTION FUNDS
0.00129.00-792.00
140743718132.6108/04/14INTERESTINTEREST EARNED JULY 2014 07 CONTRUC.FUND
0.00132.61-924.61
140844103132.2709/03/14INTERESTINTEREST EARNED AUGUST 2014 07 CONSTRUCTION FUND
0.00132.27-1,056.88
0.001,056.88-1,056.88
07364-1100C.C. TAPPING FEES0.00
1401CR4097612,600.0001/31/1430348069 1GOSHEN MEADOWS INVESTORS L.P.
0.0012,600.00-12,600.00
1402412585,400.0002/24/1435538069 1GOSHEN MEADOWS INVESTORS L.P.
RE412632,000.0002/24/1441263 1TAP IN FEE - 211 ELLIS LANE
0.007,400.00-20,000.00
1405426612,000.0005/29/1442661 1TAP IN FEE FOR 195 WYLLPEN PL
0.002,000.00-22,000.00
1407CR4327621,600.0007/03/14218069 1GOSHEN MEADOWS INVESTORS L.P.
4343421,600.0007/21/14268069 1GOSHEN MEADOWS INVESTORS L.P.
RE433121,800.0007/08/1443312 1TAP IN FEE FOR 1637 MANLEY RD
0.0045,000.00-67,000.00
0.0067,000.00-67,000.00
07364-1110R.C.TAPPING FEES0.00
1402412802,000.0002/25/1441280 1TAP IN FEE-903 SORELL HILL LT2
0.002,000.00-2,000.00
1403415532,000.0003/13/1441553 1TAP IN FEE FOR 909 SORRELL LT4
416082,000.0003/17/1441608 1TAP IN FEE-905 SORRELL LOT 3

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 3
MGRP18 run by BRIAN | 10 : 17 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
0.004,000.00-6,000.00
1405CR423554,288.8005/06/141306499 1BOWER, JUDITH
0.004,288.80-10,288.80
0.0010,288.80-10,288.80
07364-1130CONNECTION FEES - SEWER0.00
140241044423.0002/04/143508035 1JACOBS, ROBERT & CHERYL
41124423.0002/14/147748033 1GEORGE SMITH & CHRISTINA CONLE
JE41045141.1202/04/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
41125141.1202/14/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
282.24846.00-563.76
1403CR41402423.0003/04/1423078034 1STOFFLET, MICHAEL
JE41407141.1203/04/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
141.12423.00-845.64
1405CR42378423.0005/07/1410218036 1PAPPANO, JOSEPH & PATRICIA
JE42380141.1205/07/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
141.12423.00-1,127.52
564.481,692.00-1,127.52
07380-1000MISCELLANEOUS REVENUE0.00
140241045141.1202/04/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
41125141.1202/14/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
0.00282.24-282.24
140341407141.1203/04/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
0.00141.12-423.36
140542380141.1205/07/14PINE ROCKANNUAL PINE ROCK INSTALLMENT
0.00141.12-564.48
0.00564.48-564.48
07392-0500TRANSFER FROM SEWER OPERATING0.00
1401406741,000.0001/08/14DEPOSITDEPOSIT $ INTO MA GENERAL FROM 05 FUND
4074720,000.0001/14/14XFERXFER $ FROM SEWER TO MA TO COVER EXPENSES
0.0021,000.00-21,000.00

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 4
MGRP18 run by BRIAN | 10 : 17 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
0.0021,000.00-21,000.00
07424-1400ADMINISTRATIVE WAGES0.00
1403CD418158,043.0203/31/142237425EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2014 MUN.AUTH. REIMBURSM
8,043.020.008,043.02
1406431928,043.0206/30/142243425EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2014 MUN. AUTH.REIMBURSM
8,043.020.0016,086.04
16,086.040.0016,086.04
07424-3000MISCELLANEOUS EXPENSE0.00
140140597500.0001/06/1422282737DEP - COMMONWEALTH OF PA NPDES PERMITS - CHAPTER 92A 2014
950.0001/06/1422292132PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2014 ACTIVE MEMBERSHIP DUES
***1,450.000.00***
1,450.000.001,450.00
1,450.000.001,450.00
07424-3110MUNIC.AUTH.-AUDITING0.00
14074340510,800.0007/16/142246808MAILLIE FALCONIERO & CO. 2013 FINANCIAL STMTS. EXAMINATIO
10,800.000.0010,800.00
10,800.000.0010,800.00
07424-3130ENGINEERING SERVICES0.00
140140653-663.7501/06/1422241052PENNONI ASSOCIATES INC. VOID CK. DUE TO PRINTER PROBLEM
40743663.7501/14/1422301052PENNONI ASSOCIATES INC. SERVICES THRU 12/8/13 GENERAL S
JE407461,845.0001/14/14REFUNDPENNONI REFUND DUE TO DUPLICATE PAYMENT
0.001,845.00-1,845.00
1402CD411032,236.5002/11/1422331052PENNONI ASSOCIATES INC. SERVICES THROUGH 1/12/14 GEN.SER
2,236.500.00391.50

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 5
MGRP18 run by BRIAN | 10 : 17 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07424-31301403CD415406,887.2503/12/1422361052PENNONI ASSOCIATES INC. SERVICES THRU 2/9/14 2013 CHAP.
6,887.250.007,278.75
1404421538,808.2504/23/1422391052PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 CHAP.94 RE
8,808.250.0016,087.00
1405424626,198.5005/14/1422411052PENNONI ASSOCIATES INC. SERVICES THRU 4/13/14 2013 CHAP.
6,198.500.0022,285.50
1406429523,004.7506/12/1422421052PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 2014 SEMI-ANN
3,004.750.0025,290.25
1407434051,521.2507/16/1422471052PENNONI ASSOCIATES INC. SERVICES THRU 6/15/14 GEN.SERVIC
1,521.250.0026,811.50
140843811169.5008/12/1422491052PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 2014 SEMI-ANN I&I
169.500.0026,981.00
28,826.001,845.0026,981.00
07424-3140LEGAL SERVICES0.00
140241310800.0002/27/142234528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES - NOV.2013 GEN.AU
800.000.00800.00
140341540700.0003/12/142235528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - FEB.2014 GEN.AUT
700.000.001,500.00
140442074960.0004/16/142238528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - MARCH 2014 GEN.A
960.000.002,460.00
1405424621,300.0005/14/142240528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE APRIL 2014 GEN.AUT
1,300.000.003,760.00
140743291520.0007/07/142244528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE MAY 2014 - GEN.AUT
434051,480.0007/16/142245528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE JUNE 2014 - GEN.AU

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 6
MGRP18 run by BRIAN | 10 : 17 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
2,000.000.005,760.00
14084381180.0008/12/142248528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 7/3-7/14/14 GEN.AU
80.000.005,840.00
5,840.000.005,840.00
07424-7460LOCHWOOD - CAPITAL -STP0.00
1401407391,290.0001/14/14100122695BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC.201
40744-1,290.0001/14/14100122695BRICKHOUSE ENVIRONMENTAL VOID CK. - INCORRECT CASH ACCT.U
407451,290.0001/14/1422312695BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC. 20
JE408201,290.0001/22/14DEPOSITDEPOSIT TO REIMBURSE 07 MA FOR 05 EXPENSE
1,290.001,290.000.00
1,290.001,290.000.00
07427-1000RESERVE PUMP STATION - ENGINEER0.00
1405CD42462197.2505/14/1422411052PENNONI ASSOCIATES INC. SERV.THRU 4/123/14 RESERVE PS
197.250.00197.25
1406428887,316.8206/11/14100193133SMITH INC., RONALD APPLIC.# 3 RESERVE PS DIVERSION
42952619.7506/12/1422421052PENNONI ASSOCIATES INC. SERVICE THRU 5/11/14 RESERVE PS
43217-7,316.8206/30/14100193133SMITH INC., RONALD VOID CK.10019 PAYMENT AMT.TO BE REDUCED
619.750.00817.00
1407432293,658.4107/02/14100203133SMITH INC., RONALD APPL.#3 RESERVE PS DIVERSION -FI
43405309.0007/16/1422471052PENNONI ASSOCIATES INC. SERVICES THRU 6/15/14 RESERVE PS DIVERSION CONSTRUCTION
3,967.410.004,784.41
140843811476.7508/12/1422491052PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 RESERVE PS DI CONSTRUCTION
476.750.005,261.16

East Goshen Township General Ledger

Report Date 09/03/14 | GL Transaction Details | PAGE 7
MGRP18 run by BRIAN | 10 : 17 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
5,261.160.005,261.16
07428-1000RESERVOIR PUMP STATION - ENGINEER0.00
14024110710,687.5002/11/14100131052PENNONI ASSOCIATES INC. SERV.THROUGH 1/12/14 RESERVE PS
10,687.500.0010,687.50
1403415414,431.2503/12/14100141052PENNONI ASSOCIATES INC. SERV.THRU 2/9/14 RESERV.RD. PS
4,431.250.0015,118.75
1404421545,909.0004/23/14100151052PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 RESERV.RD
5,909.000.0021,027.75
1405424634,724.5005/14/14100161052PENNONI ASSOCIATES INC. SERV. THRU 4/13/14 RESERVOIR RD.
425143,150.0005/16/14100173312CONESTOGA & ASSOCIATES PROF.SERVICE THRU 3/30/14 RESERV RD. PS - BOG TURTLE HABITAT
7,874.500.0028,902.25
1406428885,761.2506/11/14100181052PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 RESERVOIR RD.
5,761.250.0034,663.50
140743406430.0007/16/14100211052PENNONI ASSOCIATES INC. SERV.THRU 6/15/14 RESERVOIR RD.
43421100.0007/18/14100223353COMMONWEALTH FINANCING AUTHORITY GRANT APPLICATION FOR DCED SEWAG FACILITIES GRANT FOR ACT 537 PLANNING FOR RESERVOIR RD P/S
530.000.0035,193.50
1408438101,208.7508/12/14100231052PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 RESERVOIR RD P ACT 537 PLANNING
1,208.750.0036,402.25
36,402.250.0036,402.25
Beg Bal0.00106,519.93104,746.371,773.56

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

[Stamp: FYI]

August 28, 2014

Dear Property Owner:

The purpose of this letter is to inform you that Mr. Anthony J. Sivo has submitted a Zoning Hearing Board application requesting a Zoning Variance for his property at 1454 Glenbrook Lane, West Chester, PA, 19380. Mr. Sivo is seeking dimensional relief to construct an accessory building within the side yard of his property. The Township Zoning Ordinance requires accessory structures larger than 120 square feet to be placed no closer than 20 feet from the property line. (§240-32.P and §240-9.G, of the Township Zoning Ordinance)

Mr. Sivo proposes to build an accessory building no larger than 240 square feet and is requesting seven (7) feet of relief from the twenty (20) foot side yard setback requirement of the ordinance, in order to place an accessory building 13 feet from the side yard property line.

Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.

The meeting dates and times scheduled for the review and discussion of this application are outlined below and subject to change.

September 3, 2014 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)

September 16, 2014 - Board of Supervisors meeting (7:00 pm)

September 25, 2014 - Zoning Hearing Board (7:30 pm) (Zoning Variance Hearing)

All hearings are held at the Township Building and are open to the public. The plans are available for review during normal business hours. Please give me a call at or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[Signature: Mark A. Gordon]

Mark A. Gordon
Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-6c\53-6C-28 1454 Glenbrook lane\ZHB App 08272014\1000 foot letter ZV 08272014.doc