Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
July 14, 2014
Monday 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s; East Goshen Township Flows for June 2014
- APPROVAL OF MINUTES June 9, 2014
- APPROVAL OF INVOICES Pennoni Invoice #594993 $ 309.00; Pennoni Invoice #594994 $ 430.00; Pennoni Invoice #594995 $1,521.25; Gawthrop Invoice #121393 $2,000.00; Maillie Invoice #1000036708 $10,800.00
- LIAISON REPORTS
- FINANCIAL REPORTS June 2014 Report; 2013 Audit Report from Maillie
- OLD BUSINESS
- GOALS Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014 May 8 – The MA does not have a current mission statement. A first draft is included in the packet. June 9 – Changed “lease” to “leasee” Approved by MA on June 9 - Completed; Submit an article for each newsletter – Due date for newsletter Need by 1/31/14 – Dana Completed Need by 4/30/14 – Jack Completed
F:\Data\Shared Data\Agendas\Municipal Authority4-14-14 -.doc
Need by 7/1/14 - Kevin
Need by 10/31/14
- Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014 May 8 - Revisions submitted to EGMA, EGPC, WGSTP, CCHD, and CCPC July 14 – BOS scheduled to adopt resolution at their meeting on August 19
- Develop a recommendation on covers for the SBRs – August 1, 2014 May 8 – Draft memo distributed. June 9 – Final memo in packet - Completed
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack- Completed 2 nd Quarter (June) – Ed- Completed 3 rd Quarter (September) 4 th Quarter (December)
- Respond to capacity requests in 45 days or less. 211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house
- Continue to implement I & I Plan April 14 – Status Report received
- Operate RCSTP in compliance with NPDES Permit January, February, March, May,
- NEW BUSINESS
- CAPACITY REQUESTS 3 Lucas Lane - Willistown Township (44 EDUs)
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST Minor Act 537 Plan Update Revision
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority4-14-14 -.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
July 11, 2014
To: Municipal Authority
From: Mark Miller
Re: June 2014 Monthly Report
Meters: All meters were read on a daily basis. We are waiting on Allied Control to schedule the installation of the portable meters.
C.C. Collection: The pump stations were visited on a daily basis. All pumps were pulled for routine maintenance at each station. Ashbridge pump station was on emergency power for 3 days.
R.C. Collection: The Hunt Country pump station was on emergency power for three days due to a power failure.
R.C. Plant: We reinstalled pump 3 at the list station. Apple Brook pumps were turned on last week.
INI: Pipe Data View will be in the last week of July to clean and televise.
Alarms: We responded to 37 alarms for the month of May.
PA One Calls: We received 119 PA One calls in May.
EGMA 1401
Pennoni
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: July 10, 2014
SUBJECT: Engineer’s Report
Invoices
- Invoices with summaries are provided under separate cover.
Reserve Pump Station Elimination
- We coordinated with the contractor to perform the outstanding site-work punchlist items: removal of the filter sock along the creek and re-topsoiling & re-seeding the lawn area at the old pump station driveway and building. We performed an inspection of the work after it was completed. We are still awaiting resubmission of as-built plans with surveyed manhole elevations.
Reservoir Road Pump Station Act 537 Plan
- We revised the construction schedule (see attached) in the Act 537 Plan to address West Goshen’s comments for compliance with the intermunicipal agreement.
- We received Act 537 Plan review forms from the East Goshen Municipal Authority, East Goshen Township Planning Commission, and Chester County Health Department. We are awaiting Act 537 Plan review forms to be completed and returned from the West Goshen Township Planning Commission and Chester County Planning Commission. Reviews were due by July 9.
- It is our understanding that the West Goshen Sewer Authority approved the Act 537 at their meeting on July 3 and that they will be sending an approval letter.
- We received feedback from the U.S. Fish & Wildlife Service (USFWS) on the Phase 1 bog turtle habitat survey report. To address their comments, we revised the plans and Act 537 narrative to propose the Chester Creek stream crossing be constructed via open cut instead of the previously proposed directional drilling. We provided the plans to Conestoga-Rovers & Associates to resubmit to USFWS for approval. We expect to receive USFWS approval the week of July 14-18.
Page 1 of 2
P:\Projects\EGMA\Memos to Board4\Memo to EGMA Board 2014-07-10.docx
EGMA 1401
- Tentative Act 537 Planning schedule: Milestone Estimated Date County and Township Agency Review Comments Due July 9, 2014 Complete Plan Revisions to Address Agency Comments July 14, 2014 Begin 30-Day Public Comment Period July 17, 2014 USFWS Bog Turtle Habitat Formal Approval/Comments July 18, 2014 End 30-Day Public Comment Period August 15, 2014 East Goshen Township Adoption August 19, 2014 Submission to PADEP August 22, 2014 PADEP Review and Approval (120 days) December 21, 2014
New Sewer Connections
- We completed a review of the revised design plans and report submission for a new private wastewater pump station for Acero Precision at 1340 Enterprise Drive, issued a comment letter, and discussed comments with the design consultant.
Fairway Village Manhole Lining
- Abel Recon performed the construction demonstration of the SprayWall monolithic polyurethane interior manhole lining system on June 10, 2014.
Sewer Ordinance and Detail Updates
- We prepared draft updates to the Township’s building sewer/lateral connection detail and sanitary sewer ordinance text.
Page 2 of 2
P:\Projects\EGMA\Memos to Board4\Memo to EGMA Board 2014-07-10.docx
East Goshen Township, Chester County
Minor Act 537 Plan Update Revision
Reservoir Road Pump Station
Section N - Project Implementation Schedule
East Goshen Municipal Authority proposes the implementation schedule in Table N.1 with milestone dates for system design and permitting. The dates for bidding, construction, and activation of the pump station will be determined based upon actual future flows in order to maintain compliance with the intermunicipal agreement with West Goshen Township.
Table N.1 - Implementation Schedule
| Project Milestone | Tentative Dates |
|---|---|
| Submit Act 537 Plan Update Revision to PADEP | August 2014 |
| PADEP Approval of Act 537 Plan Update Revision | December 2014 |
| Submit WQM Part II Application to PADEP | August 2015 |
| PADEP Approval of WQM Part II Permit | December 2015 |
| Construction Bidding | TBD (1) |
| Award Construction Contract | 2 months after bidding |
| Begin Construction | 3 months after bidding |
| Complete Construction | 9 months after bidding |
| Pump Station Activation | TBD (2) |
(1) The construction contract bidding period will occur no sooner than after two consecutive quarters in which East Goshen Township’s average daily flow to West Goshen Township (as measured at the Westtown Way Meter in the Chester Creek Interceptor) exceeds 950,000 gpd. Initiation of bidding and construction at an average daily flow of 950,000 gpd is projected to put East Goshen in position to have a pump station that is fully constructed and ready for operation when flows exceed 1,000,000 gpd.
(2) The pump station will not be permanently activated and placed into service until the intermunicipal flow exceeds 1,000,000 gpd.
EGMA1307
40
2013 FLOWMETERS
2014 JUNE 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | NET | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1000 | 10 | 10 | 10 | ||||||||
| Inches | DATE | READING | GPD | READING | GPD | READING | GPD | READING | GPD | GPD | FLOWS |
| 0.00 | 06/01/14 | ||||||||||
| 0.00 | 06/02/14 | 1,706,811 | 1,152,667 | 5,367,565 | 130,953 | 3,222,535 | 70,443 | 1,632,900 | 57,350 | 24,000 | 893,920 |
| 0.05 | 06/03/14 | 1,707,972 | 1,161,000 | 5,380,517 | 129,520 | 3,229,749 | 72,140 | 1,640,698 | 77,980 | 24,000 | 881,360 |
| 0.05 | 06/04/14 | 1,709,166 | 1,194,000 | 5,393,270 | 127,530 | 3,237,012 | 72,630 | 1,649,376 | 86,780 | 24,000 | 907,060 |
| 0.05 | 06/05/14 | 1,710,323 | 1,157,000 | 5,406,264 | 129,940 | 3,244,167 | 71,550 | 1,658,528 | 91,520 | 24,000 | 863,990 |
| 0.00 | 06/06/14 | 1,711,468 | 1,145,000 | 3,251,013 | 68,460 | 1,667,560 | 90,320 | 24,000 | 986,220 | ||
| 0.00 | 06/07/14 | 24,000 | 0 | ||||||||
| 0.12 | 06/08/14 | 24,000 | 0 | ||||||||
| 0.20 | 06/09/14 | 1,714,724 | 1,085,333 | 3,271,213 | 67,333 | 1,694,851 | 90,970 | 24,000 | 927,030 | ||
| 0.15 | 06/10/14 | 1,715,868 | 1,144,000 | 5,415,188 | 17,848 | 3,277,853 | 66,400 | 1,706,522 | 116,710 | 24,000 | 943,042 |
| 0.12 | 06/11/14 | 24,000 | 0 | ||||||||
| 0.60 | 06/12/14 | 1,718,153 | 1,142,500 | 5,439,886 | 123,490 | 3,291,418 | 67,825 | 1,728,617 | 110,475 | 24,000 | 840,710 |
| 0.17 | 06/13/14 | 1,719,366 | 1,213,000 | 5,454,638 | 147,520 | 3,298,831 | 74,130 | 1,740,151 | 115,340 | 24,000 | 876,010 |
| 0.00 | 06/14/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/15/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/16/14 | 1,722,683 | 1,105,667 | 5,494,367 | 132,430 | 3,319,059 | 67,427 | 1,770,648 | 101,657 | 24,000 | 804,153 |
| 0.00 | 06/17/14 | 1,723,814 | 1,131,000 | 5,506,577 | 122,100 | 3,325,434 | 63,750 | 1,782,706 | 120,580 | 24,000 | 824,570 |
| 0.25 | 06/18/14 | 1,724,887 | 1,073,000 | 5,518,234 | 116,570 | 3,331,883 | 64,490 | 1,794,399 | 116,930 | 24,000 | 775,010 |
| 0.08 | 06/19/14 | 1,726,042 | 1,155,000 | 5,531,700 | 134,660 | 3,338,532 | 66,490 | 1,805,824 | 114,250 | 24,000 | 839,600 |
| 0.00 | 06/20/14 | 1,727,187 | 1,145,000 | 5,544,845 | 131,450 | 3,344,925 | 63,930 | 1,816,499 | 106,750 | 24,000 | 842,870 |
| 0.00 | 06/21/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/22/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/23/14 | 1,730,270 | 1,027,667 | 5,579,070 | 114,083 | 3,363,655 | 62,433 | 1,841,224 | 82,417 | 24,000 | 768,733 |
| 0.00 | 06/24/14 | 1,731,352 | 1,082,000 | 5,590,313 | 112,430 | 3,370,098 | 64,430 | 1,851,246 | 100,220 | 24,000 | 804,920 |
| 0.50 | 06/25/14 | 1,732,408 | 1,056,000 | 5,600,958 | 106,450 | 3,376,192 | 60,940 | 1,860,837 | 95,910 | 24,000 | 792,700 |
| 0.00 | 06/26/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/27/14 | 1,734,579 | 1,085,500 | 5,625,043 | 120,425 | 3,388,429 | 61,185 | 1,878,444 | 88,035 | 24,000 | 815,855 |
| 0.00 | 06/28/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/29/14 | 24,000 | 0 | ||||||||
| 0.00 | 06/30/14 | 1,737,518 | 979,667 | 5,657,722 | 108,930 | 3,406,232 | 59,343 | 1,898,475 | 66,770 | 24,000 | 744,623 |
| Day Avg | 1,117,632 | 118,019 | 66,596 | 96,366 | 24,000 | 556,289 | |||||
| 3.69 | Day Tot | 21,235,000 | 2,006,330 | 1,265,330 | 1,830,963 | 696,000 | 16,132,377 | ||||
| Day Count | 19 | 17 | 19 | 19 | 29 | 29 | |||||
| EG TWP | |
|---|---|
| MONTH TO DATE | 3.69 |
| NORMAL MONTH TO DATE | |
| YEAR TO DATE | 32.39 |
| NORMAL YEAR TO DATE | |
f:/data/users/joanna/2003 flowmeters 7/9/201410:19 AM
2013 FLOWMETERS
2014 JUNE 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | BARKWAY | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| 10 | 100 | 10 | 10 | 10 | ||||||
| DATE | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 06/01/14 | ||||||||||
| 06/02/14 | 13,892,766 | 844,980 | 1,910,960 | 76,933 | 12,383,130 | 241,827 | 49,382,773 | 704,277 | 3,244,928 | 12,740 |
| 06/03/14 | 13,973,302 | 805,360 | 1,911,711 | 75,100 | 12,411,738 | 286,080 | 49,459,286 | 765,130 | 3,246,139 | 12,110 |
| 06/04/14 | 14052321 | 790,190 | 1,912,449 | 73,800 | 12,440,349 | 286,110 | 49,535,210 | 759,240 | 3,247,376 | 12,370 |
| 06/05/14 | 14,129,920 | 775,990 | 1,913,150 | 70,100 | 12,469,339 | 289,900 | 49,610,455 | 752,450 | 3,248,470 | 10,940 |
| 06/06/14 | 14,205,349 | 754,290 | 1,913,865 | 71,500 | 12,498,042 | 287,030 | 49,685,285 | 748,300 | 3,249,650 | 11,800 |
| 06/07/14 | ||||||||||
| 06/08/14 | ||||||||||
| 06/09/14 | 14,429,353 | 746,680 | 1,915,988 | 70,767 | 12,569,804 | 239,207 | 49,878,763 | 644,927 | 3,253,282 | 12,107 |
| 06/10/14 | 14,501,388 | 720,350 | 1,916,687 | 69,900 | 12,601,110 | 313,060 | 49,955,075 | 763,120 | 3,254,427 | 11,450 |
| 06/11/14 | ||||||||||
| 06/12/14 | 14,644,497 | 715,545 | 1,918,055 | 68,400 | 12,664,772 | 318,310 | 50,109,804 | 773,645 | 3,256,723 | 11,480 |
| 06/13/14 | 14,714,182 | 696,850 | 1,918,750 | 69,500 | 12,698,765 | 339,930 | 50,196,110 | 863,060 | 3,257,833 | 11,100 |
| 06/14/14 | ||||||||||
| 06/15/14 | ||||||||||
| 06/16/14 | 14,931,790 | 725,360 | 12,776,731 | 259,887 | 50,410,235 | 713,750 | 3,261,331 | 11,660 | ||
| 06/17/14 | 15,002,196 | 704,060 | 1,921,496 | 68,650 | 12,806,383 | 296,520 | 50,485,347 | 751,120 | 3,262,443 | 11,120 |
| 06/18/14 | 15,070,442 | 682,460 | 1,922,141 | 64,500 | 12,837,547 | 311,640 | 50,562,434 | 770,870 | 3,263,467 | 10,240 |
| 06/19/14 | 15,139,453 | 690,110 | 1,922,805 | 66,400 | 12,869,040 | 314,930 | 50,642,831 | 803,970 | 3,264,417 | 9,500 |
| 06/20/14 | 15,209,999 | 705,460 | 1,923,485 | 68,000 | 12,899,149 | 301,090 | 50,720,081 | 772,500 | 3,265,379 | 9,620 |
| 06/21/14 | ||||||||||
| 06/22/14 | ||||||||||
| 06/23/14 | 15,414,318 | 681,063 | 1,925,408 | 64,100 | 12,972,787 | 245,460 | 50,919,687 | 665,353 | 3,268,612 | 10,777 |
| 06/24/14 | 15,480,065 | 657,470 | 1,926,059 | 65,100 | 13,003,948 | 311,610 | 50,995,650 | 759,630 | 3,269,699 | 10,870 |
| 06/25/14 | 15,546,727 | 666,620 | 1,926,680 | 62,100 | 13,033,905 | 299,570 | 51,068,672 | 730,220 | 3,270,746 | 10,470 |
| 06/26/14 | ||||||||||
| 06/27/14 | 15,678,404 | 658,385 | 1,927,951 | 63,550 | 13,091,867 | 289,810 | 51,218,623 | 749,755 | 3,272,784 | 10,190 |
| 06/28/14 | ||||||||||
| 06/29/14 | ||||||||||
| 06/30/14 | 15,864,974 | 621,900 | 1,929,802 | 61,700 | 13,160,040 | 227,243 | 51,415,330 | 655,690 | 3,275,780 | 9,987 |
| 718,059 | 68,339 | 287,327 | 744,579 | 11,081 | ||||||
| 13,643,123 | 1,230,100 | 5,459,213 | 14,147,007 | 210,530 | ||||||
| 19 | 18 | 19 | 19 | 19 | ||||||
f:/data/users/joanna/
2003 flowmeters 7/9/201410:19 AM
2014 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,120,955 | 112,631 | 63,436 | 80,890 | 24,000 | 255,116 | 795,376 | |||
| FEBRUARY | 1,249,173 | 138,449 | 68,472 | 88,803 | 24,000 | 287,831 | 881,433 | |||
| MARCH | 1,182,533 | 126,933 | 67,479 | 84,197 | 24,000 | 860,074 | 75,186 | 291,520 | 827,109 | 28,696 |
| APRIL | 1,242,798 | 143,329 | 76,736 | 88,674 | 24,000 | 1,029,229 | 79,139 | 300,256 | 806,253 | 12,331 |
| MAY | 1,542,161 | 175,112 | 95,766 | 94,501 | 24,000 | 1,337,536 | 117,391 | 357,808 | 937,139 | 20,786 |
| JUNE | 1,117,632 | 118,019 | 66,596 | 96,366 | 24,000 | 718,059 | 68,339 | 287,327 | 744,579 | 11,081 |
| JULY | ||||||||||
| AUGUST | ||||||||||
| SEPTEMBER | ||||||||||
| OCTOBER | ||||||||||
| NOVEMBER | ||||||||||
| DECEMBER | ||||||||||
| Total Flows | ||||||||||
| Monthly Ave | 1,242,542 | 135,746 | 73,081 | 88,905 | 24,000 | 986,225 | 85,014 | 296,643 | 831,982 | 18,224 |
| To West Goshen | 944,811 |
|---|
2014 flowmeters -all-stations separate month worksheets.xlsxSUMMARY
June Precip. 3.69 - 2014
Chart, printed rotated 90 degrees: a 3-D vertical bar chart titled “June Precip. 3.69 - 2014”. The vertical axis is labeled “Precip.” with values from 0 to 0.6. The horizontal axis is labeled “snow/rain” with categories numbered 1 through 33 representing days of the month.
| Day | Approximate bar value |
|---|---|
| 1 to 3 | no bar |
| 4 | about 0.50 |
| 5 | about 0.50 |
| 6 | about 0.50 |
| 7 to 8 | no bar |
| 9 | about 0.12 |
| 10 | about 0.20 |
| 11 | about 0.15 |
| 12 | about 0.12 |
| 13 | about 0.60 |
| 14 | about 0.17 |
| 15 to 18 | no bar |
| 19 | about 0.25 |
| 20 | about 0.08 |
| 21 to 25 | no bar |
| 26 | about 0.50 |
| 27 to 33 | no bar |
Legend: June (blue).
2013
Monthly Precipitation
Chart, printed rotated 90 degrees: a 3-D bar chart titled “2013 Monthly Precipitation”. The value axis runs from 0 to 8 in increments of 1. The category axis lists January through December. Only January through June have bars; July through December are empty.
| Month | Approximate bar value |
|---|---|
| January | about 3.9 |
| February | about 2.9 |
| March | about 3.7 |
| April | about 7.6 |
| May | about 4.7 |
| June | about 3.8 |
| July to December | no bar |
Legend: Series1 (blue).
Flowmeters June 2014
Chart, printed rotated 90 degrees: a line chart with diamond markers titled “Flowmeters June 2014”. The horizontal axis is labeled “Day of the Month” (1 to 29); the value axis is labeled “Flow's” and runs from 0 to 1200000 in steps of 200000. The line alternates between zero and peaks around 800,000 to 1,000,000.
- Peaks (approximate): days 1 to 3 about 880,000 to 910,000; day 4 about 860,000; day 5 about 980,000; days 8 to 9 about 925,000 to 945,000; days 11 to 12 about 840,000 to 875,000; days 15 to 19 about 775,000 to 845,000; days 22 to 24 about 770,000 to 805,000; day 26 about 815,000; day 29 about 745,000.
- Zero flow on days 6, 7, 10, 13, 14, 20, 21, 25, 27, and 28.
Legend: June (blue line with diamond marker).
Monthly Totals 2012 Jan-Dec
Chart, printed rotated 90 degrees: a vertical clustered column chart titled “Monthly Totals 2012 Jan-Dec” on a light blue plot area. The value axis is labeled “Flowmeters” and runs from 0 to 2500000 in steps of 500000. The category axis is labeled “Month” and lists January through December. January through June each contain a cluster of thin bars (one per day), mostly between about 700,000 and 1,200,000, with the highest bars occurring in May (around 2,000,000 and 2,200,000). June bars range from approximately 750,000 to 1,000,000. July through December are empty. No legend is printed.
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 9, 2014
The East Goshen Township Municipal Authority held their regular public meeting on Monday, June 9, 2014 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Kevin Cummings, Dana Pizarro, and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Supervisor), Patrick McKenna (Attorney), Mark Miller (Director of Public Works), Scott Towler (BFES), and Mike Ellis (Pennoni).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response.
Chairman's Report/Other Members' Reports
Ed attended the West Goshen meeting. There was discussion about the East Goshen Reservoir Road Pump Station. West Goshen feels that 1 million gpd is the minimum under the contract. Ed explained that East Goshen is concerned about the growth in West Goshen and the 25% penalty, if they go over 1m gpd.
Sewer Reports
1. Director of Public Works
Mark Miller reported for April 2014:
Meters: All meters were read on a daily basis. The two portable meters have not arrived yet. As they come in we will get them installed. The new meters have the capabilities of sending out the reading thru the internet. Mark has asked Allied to give a cost to modify the meters to allow us to get the readings over the internet for the 2015 budget.
CC Collection: The pump station wet wells were cleaned last week. The wet well at Barkway pump station had several leaks. We packed the leaks and pumped 60 gallons of grout into them to seal the leaks. The pumps are scheduled to be pulled for routine maintenance next week. We repaired a broken lateral on Red Maple Lane. Last Monday the lateral line sheared off which was allowing heavy inflow into the system.
RC Collection: The Hunt Country pump station was visited on a routine basis with no problems to report. The wet well was cleaned last week.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 6-9-14 draft.doc 1
RC Plant: The wet well was cleaned last week. We are scheduled to re-install the lift station pump next week and pull another for routine maintenance.
Alarms: We responded to 21 alarms for the month of May.
PA One Calls: We received 116 PA calls in May.
Mark is concerned about the meter numbers. He is not sure if it is due to the new software.
2. Pennoni Engineer's Report
Mike Ellis gave the following report:
Invoices: Invoices with summaries are provided under separate cover.
Ridley creek Sewage treatment Plant (RCSTP): Pennoni continues to provide operations assistance as needed. No operational issues were brought to our attention in May.
Reserve Pump Station Elimination: There are three outstanding punch list items at the time of this report: removal of the filter sock along the creek, re-seeding/re-topsoiling the lawn area at the old pump station driveway and building, and resubmission of as-built plans with surveyed manhole elevations. The contractor has informed us that they have visited the site to evaluate the work to be performed, and they are hopeful to complete the work by June 13.
Reservoir Rd Pump Station Act 537 Plan: We are awaiting Act 537 Plan review forms to be completed and returned from the East Goshen Township Planning Commission, West Goshen Township Planning Commission, Chester County Planning Commission, Chester County Health Department and West Goshen Sewage Treatment Plant operator. Reviews are due by July 9, 2014.
Based upon the revised force main routing and additional information that we submitted, the PA Dept. of Conservation and Natural Resources (DCNR) retracted their requirement for a field botanical survey of potential threats to certain plant species.
We are awaiting feedback from the U.S. Fish & Wildlife Service on the Phase 1 bog turtle habitat survey report that was submitted by Conestoga-Rovers & Assocs. in late April.
Tentative Act 537 Planning schedule (assuming no Phase 2 bog turtle screening):
| Estimated Date | |
|---|---|
| USFWS Bog Turtle Habitat Coordination | June 30, 2014 |
| County & Township Agency Review Comments Due | July 9, 2014 |
| Revisions per agency comments | July 14, 2014 |
| 30-Day Public Comment Period | August 15, 2014 |
| East Goshen Twp. Adoption | August 19, 2014 |
| PADEP Review and Approval (120 Days) | December 21, 2014 |
New Sewer Connections
We completed a review of the design plan and report submission for a new private wastewater pump station for Acero Precision at 1340 Enterprise Drive, issued a comment letter, and discussed comments with the design consultant.
Fairway Village Manhole Lining
Abel Recon will perform the demonstration of the SprayWall monolithic polyurethane interior manhole lining system on June 10, 2014. The demonstration will begin at 11:00am at the site.
RCSTP Tank Covers
We completed the evaluation of tank cover alternatives and forwarded an updated summary memo to the Township.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 6-9-14 draft.doc 2
RESERVOIR ROAD PUMP STATION
The Authority members reviewed a letter from the Consulting Engineers for the West Goshen Sewer Authority. West Goshen does not want to lose revenue. East Goshen is not at 1 million gpd yet. West Goshen wants us to wait to do the diversion until we reach 1 million gpd. Anything over 1 million gpd is a 25% additional fee. The capacity at West Goshen is 6 million gpd. They are around 5 million gpd. West Goshen will be impacted when the total goes over 6 million gpd. Rick wants to continue the process of getting permits, etc. He suggested that construction start when East Goshen gets to 950,000 gpd. He will write a response to West Goshen.
3. Big Fish Environmental Services – The following is Scott's report for May 2014:
Treatment Process Operation- During April 2014, there were one exceedance of the final effluent discharge limitations for Outfall 001 and no discharge from Outfall 002. The exceedance reported was a total phosphorus monthly average concentration of 0.54 mg/L as compared to the permitted limitation of 0.50 mg/L.
The monthly average total phosphorus concentration was 0.54 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.30 mg/L to 0.68 mg/L with an average of 54.3 gallons per day of aluminum sulfate solution.
There was no discharge to Applebrook, Outfall 002, during April 2014.
During the month of April 2014, the total phosphorus concentrations at the final effluent outfall 001 were slightly elevated at or above the permitted discharge limitation of 0.5 mg/L.
Aluminum sulfate feed rates were increased as the month progressed to assist with total phosphorus removal. Periodically, the influent flow rate and volume to the SBRs resulted in “Filled Decants.” The Filled Decant condition results in diverting a mixture of influent wastewater and treated effluent directly to the post flow equalization basins, disc filters and disinfection prior to discharge through outfall 001.
During the month of May 2014, there was no discharge to Applebrook.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Sequencing batch reactors (SBRs) 1, 3 and 4 were in service during the month of May. Process monitoring of each SBR included ammonia as N, Nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remain reduced during the month of April. Increased sludge wasting was continued to maintain lower the MLSS concentrations. SBRs 3 & 4 were observed to have a maximum of approximately 5% to 10% of the surface area covered with a medium brown colored foam. Adjustments to the treatment process to lower the MLSS concentrations and raise the F:M ratio within the target range of 0.045 to 0.06 were ongoing during the month. Process adjustments to manage the foam included adjustments for achieving the lower ammonia as nitrogen discharge concentration of 2.5 mg/L as compared to the 7.0 mg/L during April.
Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample total
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 6-9-14 draft.doc 3
phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was increased from a daily average of 54.3 gpd during April to 82.6 gpd during May to assist with total phosphorus removal. Increased aluminum sulfate dosages prior to filtration were increased during the month. The increase in alum addition resulted in an increase in soda ash addition. During May the daily average soda ash addition was 439 lbs/day as compared to the Paril daily average of 308 lbs/day. The increase in soda ash was to assist towards maintaining pH concentrations above 7.0 standard units continued during the month.
SBR #2 remains out of service as a treatment unit, however, partially filled with MLSS which is continuously mixed and aerated. The majority of the contents were transferred to the sludge holding tanks. This SBR was periodically placed in service to assist with managing peak flows to reduce the impact of Filled Decant conditions.
The decanter for SBR 3 was occasionally observed as being slightly tilted within the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The frequency of occurrence varied during the month. The SBR is planned for removal from service during late June for inspection.
Solids Dewatering and Disposal: May 2014
During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank #1 was in service. The level at the beginning of the month was 7.44 feet and the level at the end of the month was 11.72 feet. The initial total solids concentration was 0.62% and ended the month as 0.73% total solids. The average pH concentration was 7.30 S.U. and total alkalinity of 386 mg/L. No supernatant was decanted during the month. A total of 1,000 pounds of soda ash were added during the month for pH adjustment.
Sludge holding tank #2 was in service. The level at the beginning of the month was 14.39 feet and the level at the end of the month was 13.99 feet. The initial total solids concentration was 0.97% and ended the month as 0.80% total solids. The average pH concentration was 7.38 S.U. and total alkalinity of 490 mg/L. 83,626 gallons of supernatant were decanted during the month. A total of 100 pounds of soda ash were added during the month for pH adjustment.
Significant storm/hydraulic Loading Events – None were experienced past May 2, 2014.
Minor Repairs and Preventive Maintenance
1. Replaced the Inlet air filters for blowers B1A, B1B, B1C and B2.
2. Replaced the suction and pump tubing for the influent samplers and final effluent sampler. The final effluent suction tubing is replaced monthly.
3. Replaced the pump hose on alum feed pump.
4. Cleaned and calibrated SBR LDO probes.
Approval of Minutes
Kevin moved to accept the minutes of May 12, 2014 as corrected. Dana seconded the motion. The motion passed unanimously.
Approval of Invoices
1. Dana moved to approve payment of the following Pennoni invoices:
a. Pennoni #591749 $ 691.75
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 6-9-14 draft.doc 4
b. Pennoni #591750 $ 5,761.25
c. Pennoni #591751 $ 1,766.75
d. Pennoni #591752 $ 1,238.00
Ed seconded the motion. The motion passed unanimously.
2. Dana moved to approve payment of the Gawthrop invoice #119419 for $1,300.00. Ed seconded the motion. The motion passed unanimously.
Liaison Reports
Board of Supervisors – Carmen reported that they are becoming a party to the proceedings for Sunoco.
Financial Reports
1. Jon Altshul's June 5, 2014 Financial Report for May 2014:
The Municipal Authority recorded $6,847 in revenues (primarily from tapping fees) and $15,570 in expenses in May, a difference of -$8,723. The fund balance is now $1,589,282.
Goals
1. Rick provided a draft mission statement with the correction that was requested. After review of the draft, Ed moved to adopt the mission statement. Kevin seconded the motion. The motion passed unanimously. This 2014 goal is complete.
2. The members reviewed the additional information on tank covers. It appears that as of this date the cost will be about $1 million. This 2014 goal is completed.
3. Dana made a motion to authorize the Chairman to sign the Sewer Connection Agreement for 195 Wyllpen Place in Willistown Township. Kevin seconded the motion. The motion passed unanimously.
Any Other Matter
1. Jack complimented Rick on the letter to the residents about the demonstration project on the manhole at the entrance to Fairway Village.
Adjourment
There being no further business, Rick moved to adjourn the meeting. Jack seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 6-9-14 draft.doc 5
INVOICE
Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 594993 |
|---|---|
| Invoice Date : | 06/20/2014 |
| Project : | EGMA1306 |
| Project Name : | Reserve PS Diversion Construction |
For Services Rendered through: 6/15/2014
Continued coordination with contractor to schedule punchlist work, and Sr. Engineering Tech met with contractor on-site to discuss scope of punchlist work. Authority Eng reviewed and signed notarized hard copy of Invoice #3 and forwarded to Township, and emailed CAD files to contractor for use in preparation of as-built plans
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 309.00 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 309.00 |
Amount Due This Invoice: $309.00
| Fee : | 20,000.00 |
|---|---|
| Prior Billings : | 15,057.50 |
| Current Billings : | 309.00 |
| Total Billings : | 15,366.50 |
Phase : **** – Professional Services
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 113.00 | 226.00 |
| Senior Engineering Technician | 1.00 | 83.00 | 83.00 |
| Labor Total: | 3.00 | 309.00 |
| Total Phase : **** – Professional Services — Labor : | $309.00 |
|---|---|
| Total Phase : **** – Professional Services — Expense : | $0.00 |
| Total Project : EGMA1306 – Reserve PS Diversion Construction — Labor : | $309.00 |
| Total Project : EGMA1306 – Reserve PS Diversion Construction — Expense : | $0.00 |
Handwritten note in blue ink: "ok RS 7/11"
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1306 Invoice Summary
Invoice Date 06/20/2014
| Project: | EGMA1306 | ||
|---|---|---|---|
| Pennoni Job No.: | Reserve PS Diversion Construction P | ||
| Invoice No: | 594993 | ||
| Invoice Period: | 5/12/2014 | to | 6/15/2014 |
| Initial Authorization: | $ 20,000.00 | Date: | 6/20/2014 |
| Contract Amount: | $ 20,000.00 | ||
| Previously Invoiced: | $ 15,057.50 | ||
| Current Invoice: | $ 309.00 | ||
| Invoiced to Date ($): | $ 15,366.50 | ||
| Invoiced to Date (%): | 77% | ||
| Remaining Budget ($): | $ 4,633.50 | ||
| Remaining Budget (%): | 23% |
Budget by Phase:
| Phase Name: | Reserve PS Diversion Construction Phase |
|---|---|
| Phase Budget: | $ 20,000.00 |
| Previously Invoiced: | $ 15,057.50 |
| Current Invoice: | $ 309.00 |
| Invoiced to Date ($): | $ 15,366.50 |
| Invoiced to Date (%): | 77% |
| Remaining Budget ($): | $ 4,633.50 |
| Remaining Budget (%): | 23% |
Comments: Continued coordination with contractor to schedule punchlist work, and Sr. Engineering Tech met with contractor on-site to discuss scope of punchlist work. Authority Eng reviewed and signed notarized hard copy of Invoice #3 and forwarded to Township, and emailed CAD files to contractor for use in preparation of as-built plan.
INVOICE
Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 594994 |
|---|---|
| Invoice Date : | 06/20/2014 |
| Project : | EGMA1307 |
| Project Name : | Reservoir Rd PS Act 537 Planning |
For Services Rendered through: 6/15/2014
Coordinated with DCNR to eliminate requirement for a botanical survey; reviewed West Goshen Sewer Authority's (WGSA) comment letter, reviewed intermunicipal agreement diversion provisions, evaluated scheduling revisions to Act 537 Plan to comply with agreement provisions, reviewed WGSTP's recent monthly flow data, and assisted with preparation of response letter to WGSA.
| Phase | Labor | Expense | Phase Total |
|---|---|---|---|
| Phase : 02 -- Existing Conditions Survey | 27.50 | 0.00 | 27.50 |
| Phase : 03 -- Act 537 Plan Update | 21.25 | 0.00 | 21.25 |
| Phase : 04 -- Additonal Meetings | 381.25 | 0.00 | 381.25 |
Amount Due This Invoice: $430.00
Handwritten note in blue ink: "ok RS 7/11"
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning
Invoice # : 594994
...Continued from previous page
Phase : 02 -- Existing Conditions Survey
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 110.00 | 27.50 |
| Labor Total: | 0.25 | 27.50 |
Total Phase : 02 -- Existing Conditions Survey. Labor : $27.50. Expense : $0.00.
Phase : 03 -- Act 537 Plan Update
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Senior Environmental Scientist | 0.25 | 85.00 | 21.25 |
| Labor Total: | 0.25 | 21.25 |
Total Phase : 03 -- Act 537 Plan Update. Labor : $21.25. Expense : $0.00.
Phase : 04 -- Additonal Meetings
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.25 | 110.00 | 357.50 |
| Project Engineer | 0.25 | 95.00 | 23.75 |
| Labor Total: | 3.50 | 381.25 |
Total Phase : 04 -- Additonal Meetings. Labor : $381.25. Expense : $0.00.
Total Project : EGMA1307 – Reservoir Rd PS Act 537 Planning. Labor : $430.00. Expense : $0.00.
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc. — Page: 2
East Goshen Municipal Authority
EGMA1307 Invoice Summary
Invoice Date 06/20/2014
| Project: | EGMA1307 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Act 537 Planning | ||
| Invoice No: | 594994 | ||
| Invoice Period: | 5/12/2014 | to | 6/15/2014 |
| Initial Authorization: | $ 77,400.00 | Date: | 6/20/2014 |
| Contract Amount: | $ 84,900.00 | ||
| Previously Invoiced: | $ 69,855.50 | ||
| Current Invoice: | $ 430.00 | ||
| Invoiced to Date ($): | $ 70,285.50 | ||
| Invoiced to Date (%): | 83% | ||
| Remaining Budget ($): | $ 14,614.50 | ||
| Remaining Budget (%): | 17% |
Budget by Phase:
| Phase Name: | Reservoir Rd PS Act 537 Planning |
|---|---|
| Phase Budget: | $ 84,900.00 |
| Previously Invoiced: | $ 69,855.50 |
| Current Invoice: | $ 430.00 |
| Invoiced to Date ($): | $ 70,285.50 |
| Invoiced to Date (%): | 83% |
| Remaining Budget ($): | $ 14,614.50 |
| Remaining Budget (%): | 17% |
Comments: Coordinated with DCNR to eliminate requirement for a botanical survey; reviewed West Goshen Sewer Authority's (WGSA) comment letter, reviewed intermunicipal agreement diversion provisions, evaluated scheduling revisions to Act 537 Plan to comply with agreement provisions, reviewed WGSTP's recent monthly flow data, and assisted with preparation of response letter to WGSA.
INVOICE
Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 594995 |
|---|---|
| Invoice Date : | 06/20/2014 |
| Project : | EGMA1401 |
| Project Name : | 2014 General Services |
For Services Rendered through: 6/15/2014
Prepared June Engineer's Report; attended May and June Municipal Authority meetings; finalized and submitted RCSTP tank cover alternatives memo Update #1; coordinated pre-construction matters with contractor and Township for SprayWall manhole lining demonstration for Fairway Village manhole and traffic control, and Sr. Engineering Tech provided on-site coordination and construction observation during the manhole lining work.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 1,521.25 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 1,521.25 |
Amount Due This Invoice: $1,521.25
| Fee : | 10,300.00 |
|---|---|
| Prior Billings : | 5,580.00 |
| Current Billings : | 1,521.25 |
| Total Billings : | 7,101.25 |
Phase : **** -- Professional Services
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 9.00 | 113.00 | 1,017.00 |
| Project Engineer | 2.25 | 95.00 | 213.75 |
| Senior Engineering Technician | 3.50 | 83.00 | 290.50 |
| Labor Total: | 14.75 | 1,521.25 |
| Total Phase : **** -- Professional Services — Labor : | $1,521.25 |
|---|---|
| Total Phase : **** -- Professional Services — Expense : | $0.00 |
| Total Project : EGMA1401 – 2014 General Services — Labor : | $1,521.25 |
| Total Project : EGMA1401 – 2014 General Services — Expense : | $0.00 |
Handwritten note in blue ink: "ok RS 7/11"
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 06/20/2014
| Project: | EGMA1401 | ||
|---|---|---|---|
| Pennoni Job No.: | 2014 General Services | ||
| Invoice No: | 594995 | ||
| Invoice Period: | 5/12/2014 | to | 6/15/2014 |
| Initial Authorization: | $ 10,300.00 | Date: | 6/20/2014 |
| Contract Amount: | $ 10,300.00 | ||
| Previously Invoiced: | $ 5,580.00 | ||
| Current Invoice: | $ 1,521.25 | ||
| Invoiced to Date ($): | $ 7,101.25 | ||
| Invoiced to Date (%): | 69% | ||
| Remaining Budget ($): | $ 3,198.75 | ||
| Remaining Budget (%): | 31% |
Budget by Phase:
| Phase Name: | 2014 General Services |
|---|---|
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 5,580.00 |
| Current Invoice: | $ 1,521.25 |
| Invoiced to Date ($): | $ 7,101.25 |
| Invoiced to Date (%): | 69% |
| Remaining Budget ($): | $ 3,198.75 |
| Remaining Budget (%): | 31% |
Comments: Prepared June Engineer's Report; attended May and June Municipal Authority meetings; finalized and submitted RCSTP tank cover alternatives memo Update #1; coordinated pre-construction matters with contractor and Township for SprayWall manhole lining demonstration for Fairway Village manhole and traffic control, and Sr. Engineering Tech provided on-site coordination and construction observation during the manhole lining work.
Gawthrop Greenwood, PC Attorneys at Law (logo)
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Page: | 1 |
|---|---|
| Date: | 06/30/2014 |
| Client No: | 6604-001M |
| Invoice No. | 121393 |
General Authority Services
Fees
| Date | Timekeeper | Description | Hours |
|---|---|---|---|
| 06/09/2014 | PMM | Review and analyze meeting packet; attend meeting. | 2.00 |
| 06/10/2014 | PMM | Emails from R Smith regarding agreement with West Goshen Township. | 0.30 |
| 06/11/2014 | PMM | Review and analyze WGSA treatment plant agreement regarding diverting flows and reserved capacity; long email to R Smith and EGMA members regarding interpretation of same; reply from R Smith; review and analyze all addendums (7) to plant agreement. | 1.50 |
| 06/12/2014 | PMM | Email from M Ellis regarding interpretation of agreement with West Goshen; email from R Smith regarding same; reply from M Ellis; email from D Pizzaro regarding same; email from R Smith regarding revised draft letter to West Goshen; reply. | 1.40 |
| 06/16/2014 | PMM | Numerous emails from E McAssey, K Cummings and R Smith regarding West Goshen capacity; reply. | 1.20 |
| 06/17/2014 | PMM | Emails from K Cummings and E McAssey regarding interpretation of agreement with West Chester. | 0.40 |
| 06/18/2014 | PMM | Emails from R Smith regarding West Goshen plant capacity and expansion agreement. | 0.60 |
| For Current Services Rendered | 7.40 | ||
Amount: 1,480.00
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 7.40 | $200.00 | $1,480.00 |
East Goshen Municipal Authority
| Page: | 2 |
|---|---|
| Date: | 06/30/2014 |
| Client No: | 6604-001M |
| Invoice No. | 121393 |
General Authority Services
Handwritten note in blue ink: "PAID on 7/7/11"
| Previous Balance | $520.00 |
|---|---|
| Total Current Charges | 1,480.00 |
| Balance Due | $2,000.00 |
Handwritten note in blue ink: "ok RS 7/11 $2,000.00"; the balance due is circled.
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Maillie
Expertise Beyond The Numbers
PO Box 680, Oaks, PA 19456-0680
Phone: 610-935-1420
E-mail: firm@maillie.com
Web: www.maillie.com
[Stamp: RECEIVED]
Client Number: 2500
Invoice: 1000036708
East Goshen Municipal Authority
Attn: Mr. Rick Smith
1580 Paoli Pike
West Chester, PA 19380-6107
Date: 06/30/2014
Due Date: 07/30/2014
| Description | Amount |
|---|---|
| For examination of the financial statements of the Authority for the year ended December 31, 2013, and assistance with preparation of Management Discussion and Analysis report, including additional work related to new bond issue and various construction projects | $10,800.00 |
| Billed Time & Expenses | $10,800.00 |
| Invoice Total | $10,800.00 |
| 06/30/2014 | 05/31/2014 | 04/30/2014 | 03/31/2014 | 02/28/2014+ | Total |
|---|---|---|---|---|---|
| 10,800.00 | 0.00 | 0.00 | 0.00 | 0.00 | $10,800.00 |
Please return this portion with payment.
Invoice: 1000036708
ID: 2500
East Goshen Municipal Authority
610-692-7171
Date: 06/30/2014
Due Date: 07/30/2014
Amount Due: $10,800.00
Amount Enclosed: $ _________
Finance charges of 1 1/2% per month will be added to the unpaid balance of accounts over 30 days from invoice date. Annual percentage rate of 18%.
ok RS 7-7-14
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA June Financial Reports
Date: July 8, 2014
The Municipal Authority recorded $130 in revenues (interest) and $17,429 in expenses in June, a difference of -$17,299. The fund balance is now $1,571,983. June expenses included the quarterly administrative charge back ($8,043), engineering services ($3,005) and engineering services on the Reservoir Road Pumping Station ($5,761).
A complete list of all year-to-date expenses and revenues is provided.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
June 2014
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 1,589,281.93 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 2,000.00 | 129.00 | 792.00 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 2,000.00 | 129.00 | 792.00 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO SEWER SINKING FUND | 07492 0550 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | 2,000.00 | 129.00 | 792.00 |
U:\bmccool\2014\Municipal Authority\2014 - 06 - Municipal Authority Report.xlsx Page 1 of 3 07/03/14
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
June 2014
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 27.00 | 0.75 | 6.48 |
| C.C. TAPPING FEES | 07364 1100 | 124,000.00 | 0.00 | 22,000.00 |
| R.C.TAPPING FEES | 07364 1110 | 21,444.00 | 0.00 | 10,288.80 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 1,127.52 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0.00 | 0.00 | 564.48 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 0.00 | 0.00 | 21,000.00 |
| TOTAL REVENUE | 145,471.00 | 0.75 | 54,987.28 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,768.00 | 8,043.02 | 16,086.04 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 4,000.00 | 0.00 | 1,450.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 10,800.00 | 0.00 | 0.00 |
| ENGINEERING SERVICES | 07424 3130 | 35,525.00 | 3,004.75 | 25,290.25 |
| LEGAL SERVICES | 07424 3140 | 7,000.00 | 0.00 | 3,760.00 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 22,120.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 5,115.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 117,328.00 | 11,047.77 | 46,586.29 | |
| OPERATING NET RESULT | 28,143.00 | (11,047.02) | 8,400.99 |
U:\bmccool\2014\Municipal Authority\2014 - 06 - Municipal Authority Report.xlsx Page 2 of 3 07/03/14
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
June 2014
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 0.00 | 0.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 0.00 | 0.00 | 0.00 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 0.00 | 0.00 | 0.00 |
| MANHOLE COVER REPLACEMENTS | 07424.7405 | 0.00 | 0.00 | 0.00 |
| C.C. CAPITAL - COLLECTION | 07424.7420 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 0.00 | 619.75 | 817.00 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 75,000.00 | 5,761.25 | 34,663.50 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 75,000.00 | 6,381.00 | 35,480.50 | |
| CAPITAL NET RESULT | (75,000.00) | (6,381.00) | (35,480.50) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 1,571,982.91 |
U:\bmccool\2014\Municipal Authority\2014 - 06 - Municipal Authority Report.xlsx Page 3 of 3 07/03/14
East Goshen Township General Ledger
Report Date 07/03/14
GL Transaction Details
PAGE 1
MGRP18 run by BRIAN 3 : 12 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | INTEREST EARNINGS | 0.00 | ||||||||
| 1401 | JE | 41027 | 0.58 | 02/04/14 | INTEREST | INTEREST EARNED JANUARY 2014 07 FUND |
||||
| 0.00 | 0.58 | -0.58 | ||||||||
| 1402 | 41391 | 1.33 | 03/04/14 | INTEREST | INTEREST EARNED FEBRUARY 2014 07100.1000 |
|||||
| 0.00 | 1.33 | -1.91 | ||||||||
| 1403 | 41840 | 1.71 | 04/01/14 | INTEREST | INTEREST EARNED MARCH 2014 07 FUND |
|||||
| 0.00 | 1.71 | -3.62 | ||||||||
| 1404 | 42321 | 1.21 | 05/02/14 | INTEREST | INTEREST EARNED APRIL 2014 07100.1000 |
|||||
| 0.00 | 1.21 | -4.83 | ||||||||
| 1405 | 42739 | 0.90 | 06/02/14 | INTEREST | INTEREST EARNED MAY 2014 07100.1000 |
|||||
| 0.00 | 0.90 | -5.73 | ||||||||
| 1406 | 43211 | 0.75 | 07/01/14 | INTEREST | INTEREST EARNED JUNE 2014 07100.1000 |
|||||
| 0.00 | 0.75 | -6.48 | ||||||||
| 0.00 | 6.48 | -6.48 | ||||||||
| 07341-1020 | INTEREST EARNED - RCSTP EXPANSION | 0.00 | ||||||||
| 1401 | 41028 | 137.33 | 02/04/14 | INTEREST | INTEREST EARNED JANUARY 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 137.33 | -137.33 | ||||||||
| 1402 | 41392 | 123.56 | 03/04/14 | INTEREST | INTEREST EARNED FEBRUARY 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 123.56 | -260.89 | ||||||||
| 1403 | 41841 | 136.07 | 04/01/14 | INTEREST | INTEREST EARNED MARCH 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 136.07 | -396.96 | ||||||||
| 1404 | 42322 | 131.45 | 05/02/14 | INTEREST | INTEREST EARNED APRIL 2014 CONSTRUCT.FUNDS |
|||||
| 0.00 | 131.45 | -528.41 | ||||||||
| 1405 | 42740 | 134.59 | 06/02/14 | INTEREST | INTEREST EARNED MAY 2014 07 FUND - CONSTRUCTION |
|||||
| 0.00 | 134.59 | -663.00 | ||||||||
| 1406 | 43212 | 129.00 | 07/01/14 | INTEREST | INTEREST EARNED JUNE 2014 07 CONSTRUCTION FUNDS |
|||||
East Goshen Township General Ledger
Report Date 07/03/14
GL Transaction Details
PAGE 2
MGRP18 run by BRIAN 3 : 12 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 129.00 | -792.00 | ||||||||
| 0.00 | 792.00 | -792.00 | ||||||||
| 07364-1100 | C.C. TAPPING FEES | 0.00 | ||||||||
| 1401 | CR | 40976 | 12,600.00 | 01/31/14 | 3034 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
| 0.00 | 12,600.00 | -12,600.00 | ||||||||
| 1402 | 41258 | 5,400.00 | 02/24/14 | 3553 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | ||||
| RE | 41263 | 2,000.00 | 02/24/14 | 41263 1 | TAP IN FEE - 211 ELLIS LANE | |||||
| 0.00 | 7,400.00 | -20,000.00 | ||||||||
| 1405 | 42661 | 2,000.00 | 05/29/14 | 42661 1 | TAP IN FEE FOR 195 WYLLPEN PL | |||||
| 0.00 | 2,000.00 | -22,000.00 | ||||||||
| 0.00 | 22,000.00 | -22,000.00 | ||||||||
| 07364-1110 | R.C.TAPPING FEES | 0.00 | ||||||||
| 1402 | 41280 | 2,000.00 | 02/25/14 | 41280 1 | TAP IN FEE-903 SORELL HILL LT2 | |||||
| 0.00 | 2,000.00 | -2,000.00 | ||||||||
| 1403 | 41553 | 2,000.00 | 03/13/14 | 41553 1 | TAP IN FEE FOR 909 SORRELL LT4 | |||||
| 41608 | 2,000.00 | 03/17/14 | 41608 1 | TAP IN FEE-905 SORRELL LOT 3 | ||||||
| 0.00 | 4,000.00 | -6,000.00 | ||||||||
| 1405 | CR | 42355 | 4,288.80 | 05/06/14 | 130 | 6499 | 1 BOWER, JUDITH | |||
| 0.00 | 4,288.80 | -10,288.80 | ||||||||
| 0.00 | 10,288.80 | -10,288.80 | ||||||||
| 07364-1130 | CONNECTION FEES - SEWER | 0.00 | ||||||||
| 1402 | 41044 | 423.00 | 02/04/14 | 350 | 8035 | 1 JACOBS, ROBERT & CHERYL | ||||
| 41124 | 423.00 | 02/14/14 | 774 | 8033 | 1 GEORGE SMITH & CHRISTINA CONLE | |||||
| JE | 41045 | 141.12 | 02/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 41125 | 141.12 | 02/14/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 282.24 | 846.00 | -563.76 | ||||||||
| 1403 | CR | 41402 | 423.00 | 03/04/14 | 2307 | 8034 | 1 STOFFLET, MICHAEL | |||
| JE | 41407 | 141.12 | 03/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -845.64 | ||||||||
| 1405 | CR | 42378 | 423.00 | 05/07/14 | 1021 | 8036 | 1 PAPPANO, JOSEPH & PATRICIA | |||
| JE | 42380 | 141.12 | 05/07/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -1,127.52 | ||||||||
| 564.48 | 1,692.00 | -1,127.52 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/14
GL Transaction Details
PAGE 3
MGRP18 run by BRIAN 3 : 12 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07380-1000 | MISCELLANEOUS REVENUE | 0.00 | ||||||||
| 1402 | 41045 | 141.12 | 02/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 41125 | 141.12 | 02/14/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 0.00 | 282.24 | -282.24 | ||||||||
| 1403 | 41407 | 141.12 | 03/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 0.00 | 141.12 | -423.36 | ||||||||
| 1405 | 42380 | 141.12 | 05/07/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 0.00 | 141.12 | -564.48 | ||||||||
| 0.00 | 564.48 | -564.48 | ||||||||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 0.00 | ||||||||
| 1401 | 40674 | 1,000.00 | 01/08/14 | DEPOSIT | DEPOSIT $ INTO MA GENERAL FROM 05 FUND |
|||||
| 40747 | 20,000.00 | 01/14/14 | XFER | XFER $ FROM SEWER TO MA TO COVER EXPENSES |
||||||
| 0.00 | 21,000.00 | -21,000.00 | ||||||||
| 0.00 | 21,000.00 | -21,000.00 | ||||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 0.00 | ||||||||
| 1403 | CD | 41815 | 8,043.02 | 03/31/14 | 2237 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2014 MUN.AUTH. REIMBURSM |
|||
| 8,043.02 | 0.00 | 8,043.02 | ||||||||
| 1406 | 43192 | 8,043.02 | 06/30/14 | 2243 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2014 MUN. AUTH.REIMBURSM |
||||
| 8,043.02 | 0.00 | 16,086.04 | ||||||||
| 16,086.04 | 0.00 | 16,086.04 | ||||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 0.00 | ||||||||
| 1401 | 40597 | 500.00 | 01/06/14 | 2228 | 2737 | DEP - COMMONWEALTH OF PA NPDES PERMITS - CHAPTER 92A 2014 |
||||
| 950.00 | 01/06/14 | 2229 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2014 ACTIVE MEMBERSHIP DUES |
||||||
| *** | 1,450.00 | 0.00 | *** | |||||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 07424-3130 | ENGINEERING SERVICES | 0.00 | ||||||||
| 40653 | -663.75 | 01/06/14 | 2224 | 1052 | PENNONI ASSOCIATES INC. VOID CK. DUE TO PRINTER PROBLEM |
|||||
East Goshen Township General Ledger
Report Date 07/03/14
GL Transaction Details
PAGE 4
MGRP18 run by BRIAN 3 : 12 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-3130 | 1401 | CD | 40743 | 663.75 | 01/14/14 | 2230 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/8/13 GENERAL S |
||
| JE | 40746 | 1,845.00 | 01/14/14 | REFUND | PENNONI REFUND DUE TO DUPLICATE PAYMENT |
|||||
| 0.00 | 1,845.00 | -1,845.00 | ||||||||
| 1402 | CD | 41103 | 2,236.50 | 02/11/14 | 2233 | 1052 | PENNONI ASSOCIATES INC. SERVICES THROUGH 1/12/14 GEN.SER |
|||
| 2,236.50 | 0.00 | 391.50 | ||||||||
| 1403 | 41540 | 6,887.25 | 03/12/14 | 2236 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 2/9/14 2013 CHAP. |
||||
| 6,887.25 | 0.00 | 7,278.75 | ||||||||
| 1404 | 42153 | 8,808.25 | 04/23/14 | 2239 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 CHAP.94 RE |
||||
| 8,808.25 | 0.00 | 16,087.00 | ||||||||
| 1405 | 42462 | 6,198.50 | 05/14/14 | 2241 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 4/13/14 2013 CHAP. |
||||
| 6,198.50 | 0.00 | 22,285.50 | ||||||||
| 1406 | 42952 | 3,004.75 | 06/12/14 | 2242 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 2014 SEMI-ANN |
||||
| 3,004.75 | 0.00 | 25,290.25 | ||||||||
| 27,135.25 | 1,845.00 | 25,290.25 | ||||||||
| 07424-3140 | LEGAL SERVICES | 0.00 | ||||||||
| 1402 | 41310 | 800.00 | 02/27/14 | 2234 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES - NOV.2013 GEN.AU |
||||
| 800.00 | 0.00 | 800.00 | ||||||||
| 1403 | 41540 | 700.00 | 03/12/14 | 2235 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - FEB.2014 GEN.AUT |
||||
| 700.00 | 0.00 | 1,500.00 | ||||||||
| 1404 | 42074 | 960.00 | 04/16/14 | 2238 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - MARCH 2014 GEN.A |
||||
| 960.00 | 0.00 | 2,460.00 | ||||||||
| 1405 | 42462 | 1,300.00 | 05/14/14 | 2240 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE APRIL 2014 GEN.AUT |
||||
| 1,300.00 | 0.00 | 3,760.00 | ||||||||
| 3,760.00 | 0.00 | 3,760.00 | ||||||||
| 07424-7460 | LOCHWOOD - CAPITAL -STP | 0.00 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/14
GL Transaction Details
PAGE 5
MGRP18 run by BRIAN 3 : 12 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1401 | CD | 40739 | 1,290.00 | 01/14/14 | 10012 | 2695 | BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC.201 |
|||
| 40744 | -1,290.00 | 01/14/14 | 10012 | 2695 | BRICKHOUSE ENVIRONMENTAL VOID CK. - INCORRECT CASH ACCT.U |
|||||
| 40745 | 1,290.00 | 01/14/14 | 2231 | 2695 | BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC. 20 |
|||||
| JE | 40820 | 1,290.00 | 01/22/14 | DEPOSIT | DEPOSIT TO REIMBURSE 07 MA FOR 05 EXPENSE |
|||||
| 1,290.00 | 1,290.00 | 0.00 | ||||||||
| 1,290.00 | 1,290.00 | 0.00 | ||||||||
| 07427-1000 | RESERVE PUMP STATION - ENGINEER | 0.00 | ||||||||
| 1405 | CD | 42462 | 197.25 | 05/14/14 | 2241 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 4/123/14 RESERVE PS |
|||
| 197.25 | 0.00 | 197.25 | ||||||||
| 1406 | 42888 | 7,316.82 | 06/11/14 | 10019 | 3133 | SMITH INC., RONALD APPLIC.# 3 RESERVE PS DIVERSION |
||||
| 42952 | 619.75 | 06/12/14 | 2242 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 5/11/14 RESERVE PS |
|||||
| 43217 | -7,316.82 | 06/30/14 | 10019 | 3133 | SMITH INC., RONALD VOID CK.10019 PAYMENT AMT.TO BE REDUCED |
|||||
| 619.75 | 0.00 | 817.00 | ||||||||
| 817.00 | 0.00 | 817.00 | ||||||||
| 07428-1000 | RESERVOIR PUMP STATION - ENGINEER | 0.00 | ||||||||
| 1402 | 41107 | 10,687.50 | 02/11/14 | 10013 | 1052 | PENNONI ASSOCIATES INC. SERV.THROUGH 1/12/14 RESERVE PS |
||||
| 10,687.50 | 0.00 | 10,687.50 | ||||||||
| 1403 | 41541 | 4,431.25 | 03/12/14 | 10014 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 2/9/14 RESERV.RD. PS |
||||
| 4,431.25 | 0.00 | 15,118.75 | ||||||||
| 1404 | 42154 | 5,909.00 | 04/23/14 | 10015 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 RESERV.RD |
||||
| 5,909.00 | 0.00 | 21,027.75 | ||||||||
| 1405 | 42463 | 4,724.50 | 05/14/14 | 10016 | 1052 | PENNONI ASSOCIATES INC. SERV. THRU 4/13/14 RESERVOIR RD. |
||||
| 42514 | 3,150.00 | 05/16/14 | 10017 | 3312 | CONESTOGA & ASSOCIATES PROF.SERVICE THRU 3/30/14 RESERV RD. PS - BOG TURTLE HABITAT |
|||||
| 7,874.50 | 0.00 | 28,902.25 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/14
GL Transaction Details
PAGE 6
MGRP18 run by BRIAN 3 : 12 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07428-1000 | 1406 | CD | 42888 | 5,761.25 | 06/11/14 | 10018 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 RESERVOIR RD. |
||
| 5,761.25 | 0.00 | 34,663.50 | ||||||||
| 34,663.50 | 0.00 | 34,663.50 | ||||||||
| Beg Bal | 0.00 | 85,766.27 | 59,478.76 | 26287.51 |
Maillie
Expertise Beyond The Numbers
P.O. Box 3068, West Chester, PA 19381-3068 | 610.696.4353 | Fax: 610.430.8811 | www.maillie.com
Partners
D. Scott Detar
James M. Powers
Glenn B. Bachman
Raymond T. Mock
Robert L. Caruso
Edward J. Furman
Robert L. Boland
Donald J. Pierce
Richard A. Flanagan, IV
Craig S. Springer
Robert C. Hershey, Jr.
Gregory J. Shank
Laurie E. Harvey
Principals
Edward Fronczkowski
S. Mark Fuga
James E. Yiaski
William Breslawski Jr.
Shawn M. Cahill
Kathleen A. Wileczek
June 23, 2014
To the Members of the Board
East Goshen Municipal Authority
West Chester, Pennsylvania
We have audited the financial statements of the East Goshen Municipal Authority as of and for the year ended December 31, 2013, and have issued our report thereon dated June 10, 2014. Professional standards require that we advise you of the following matters relating to our audit.
OUR RESPONSIBILITY IN RELATION TO THE FINANCIAL STATEMENT AUDIT
As communicated in our engagement letter dated October 16, 2013, our responsibility, as described by professional standards, is to form and express an opinion(s) about whether the financial statements that have been prepared by management with your oversight are presented fairly, in all material respects, in conformity with accounting principles generally accepted in the United States of America. Our audit of the financial statements does not relieve you or management of your respective responsibilities.
Our responsibility, as prescribed by professional standards, is to plan and perform our audit to obtain reasonable, rather than absolute, assurance about whether the financial statements are free of material misstatement. An audit of financial statements includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control over financial reporting. Accordingly, as part of our audit, we considered the internal control of the East Goshen Municipal Authority solely for the purpose of determining our audit procedures and not to provide any assurance concerning such internal control.
We are also responsible for communicating significant matters related to the audit that are, in our professional judgment, relevant to your responsibilities in overseeing the financial reporting process. However, we are not required to design procedures for the purpose of identifying other matters to communicate to you.
PLANNED SCOPE AND TIMING OF THE AUDIT
We conducted our audit consistent with the planned scope and timing we previously communicated to you.
Certified Public Accountants and Business Consultants
Maillie
Expertise Beyond The Numbers
To the Members of the Board
East Goshen Municipal Authority
- 2 -
June 23, 2014
COMPLIANCE WITH ALL ETHICS REQUIREMENTS REGARDING INDEPENDENCE
The engagement team, others in our firm, as appropriate, our firm and our network firms have complied with all relevant ethical requirements regarding independence.
QUALITATIVE ASPECTS OF THE ENTITY'S SIGNIFICANT ACCOUNTING PRACTICES
Significant Accounting Policies
Management has the responsibility to select and use appropriate accounting policies. A summary of the significant accounting policies adopted by the East Goshen Municipal Authority is included in Note A to the financial statements. There have been no initial selection of accounting policies and no changes in significant accounting policies or their application during the year. No matters have come to our attention that would require us, under professional standards, to inform you about (1) the methods used to account for significant unusual transactions and (2) the effect of significant accounting policies in controversial or emerging areas for which there is a lack of authoritative guidance or consensus.
Significant Accounting Estimates
Accounting estimates are an integral part of the financial statements prepared by management and are based on management's current judgments. Those judgments are normally based on knowledge and experience about past and current events and assumptions about future events. Certain accounting estimates are particularly sensitive because of their significance to the financial statements and because of the possibility that future events affecting them may differ markedly from management's current judgments.
Financial Statement Disclosures
The financial statement disclosures are neutral, consistent and clear.
SIGNIFICANT DIFFICULTIES ENCOUNTERED DURING THE AUDIT
We encountered no significant difficulties in dealing with management relating to the performance of the audit.
Certified Public Accountants and Business Consultants
Maillie
Expertise Beyond The Numbers
To the Members of the Board
East Goshen Municipal Authority
- 3 -
June 23, 2014
UNCORRECTED AND CORRECTED MISSTATEMENTS
For purposes of this communication, professional standards require us to accumulate all known and likely misstatements identified during the audit, other than those that we believe are trivial, and communicate them to the appropriate level of management. Further, professional standards require us to also communicate the effect of uncorrected misstatements related to prior periods on the relevant classes of transactions, account balances or disclosures and the financial statements as a whole. Management has corrected all identified misstatements.
In addition, professional standards require us to communicate to you all material, corrected misstatements that were brought to the attention of management as a result of our audit procedures. The attached schedule of material misstatements that we identified as a result of our audit procedures was brought to the attention of, and corrected by, management.
DISAGREEMENTS WITH MANAGEMENT
For purposes of this letter, professional standards define a disagreement with management as a matter, whether or not resolved to our satisfaction, concerning a financial accounting, reporting, or auditing matter, which could be significant to the East Goshen Municipal Authority's financial statements or the auditors' report. No such disagreements arose during the course of the audit.
REPRESENTATIONS REQUESTED FROM MANAGEMENT
We have requested certain written representations from management, which are included in the management representation letter dated June 10, 2014.
MANAGEMENT'S CONSULTATIONS WITH OTHER ACCOUNTANTS
In some cases, management may decide to consult with other accountants about auditing and accounting matters. Management informed us that, and to our knowledge, there were no consultations with other accountants regarding auditing and accounting matters.
OTHER SIGNIFICANT MATTERS, FINDINGS OR ISSUES
In the normal course of our professional association with the East Goshen Municipal Authority, we generally discuss a variety of matters, including the application of accounting principles and auditing standards, operating and regulatory conditions affecting the entity and operational plans and strategies that may affect the risks of material misstatement. None of the matters discussed resulted in a condition to our retention as the East Goshen Municipal Authority's auditors.
Certified Public Accountants and Business Consultants
Maillie
Expertise Beyond The Numbers
To the Members of the Board
East Goshen Municipal Authority
- 4 -
June 23, 2014
This report is intended solely for the information and use of the Members of the Board and management of the East Goshen Municipal Authority and is not intended to be and should not be used by anyone other than these specified parties.
Very truly yours,
Maillie LLP
MAILLIE LLP
Certified Public Accountants and
Business Consultants
Certified Public Accountants and Business Consultants
Maillie
Expertise Beyond The Numbers
6/23/2014
2:37 PM
Client: 2500 - East Goshen Municipal Authority
Engagement: 2013 - East Goshen Municipal Authority
Period Ending: 12/31/2013
Trial Balance: TB-Municipal Authority
Workpaper: 3510MA05 - Adjusting Journal Entries Report
| Account | Description | W/P Ref | Debit | Credit |
|---|---|---|---|---|
| Adjusting Journal Entries JE # 101 | PY | |||
| To record prior year cumulative accrual balances and agree net assets. | ||||
| 07-100-1900 | Lease payment receivable | 8,986,000.00 | ||
| 07-279-1000 | FUND BALANCE | 22,609.00 | ||
| 07-200-2000 | ACCOUNTS PAYABLE | 16,654.00 | ||
| 07-200-2500 | Note payable - DVRFA | 518,000.00 | ||
| 07-200-2501 | Note Payable - 2008 | 8,468,000.00 | ||
| 07-200-3000 | Accrued interest payable | 5,955.00 | ||
| Total | 9,008,609.00 | 9,008,609.00 | ||
| Adjusting Journal Entries JE # 102 | PY | |||
| To reverse prior year accounts payable | ||||
| 07-200-2000 | ACCOUNTS PAYABLE | 16,654.00 | ||
| 07-424-3130 | ENGINEERING SERVICES | 3,265.00 | ||
| 07-424-3140 | LEGAL SERVICES | 3,289.00 | ||
| 07-424-7475 | LOCHWOOD ABANDONMENT ENGINEER | 512.00 | ||
| 07-425-1000 | MARYDELL PUMP STATION - ENGINEER | 5,494.00 | ||
| 07-426-1000 | HERSHEY MILL STATION - ENGINEER | 2,047.00 | ||
| 07-427-1000 | RESERVE PUMP STATION - ENGINEER | 2,047.00 | ||
| Total | 16,654.00 | 16,654.00 | ||
| Adjusting Journal Entries JE # 103 | PY | |||
| To reverse prior year accrued interest payable | ||||
| 07-200-3000 | Accrued interest payable | 5,955.00 | ||
| 07-100-1910 | RESERVE FOR FUTURE CAPITAL EXPENDITURES | 5,955.00 | ||
| Total | 5,955.00 | 5,955.00 | ||
| Adjusting Journal Entries JE # 104 | 5100MA01 | |||
| To record current year accounts payable | ||||
| 07-424-3130 | ENGINEERING SERVICES | 2,133.00 | ||
| 07-424-7460 | LOCHWOOD - CAPITAL -STP | 1,290.00 | ||
| 07-428-1000 | RESERVOIR PUMP STATION - ENGINEER | 7,023.00 | ||
| 07-200-2000 | ACCOUNTS PAYABLE | 10,446.00 | ||
| Total | 10,446.00 | 10,446.00 | ||
| Adjusting Journal Entries JE # 105 | 5300MA01 | |||
| To adjust lease payment receivable for principal payment received from Township | ||||
| 07-492-0500 | TRANSFER TO SEW.OPERATING | 358,000.00 | ||
| 07-100-1900 | Lease payment receivable | 358,000.00 | ||
| Total | 358,000.00 | 358,000.00 | ||
| Adjusting Journal Entries JE # 106 | 5300MA01 | |||
| To gross up Lease Rental Collections | ||||
| 07-200-2500 | Note payable - DVRFA | 74,000.00 | ||
| 07-200-2501 | Note Payable - 2008 | 284,000.00 | ||
| 07-472-1000 | M.C.-DVRFA-INTEREST PAYMN | 365,972.00 | ||
| 07-364-4200 | Lease rental collections | 723,972.00 | ||
| Total | 723,972.00 | 723,972.00 | ||
| Adjusting Journal Entries JE # 107 | 5300MA05 | |||
| To record current year accrued interest | ||||
| 07-100-1910 | RESERVE FOR FUTURE CAPITAL EXPENDITURES | 6,986.00 | ||
| 07-200-3000 | Accrued interest payable | 6,986.00 | ||
| Total | 6,986.00 | 6,986.00 | ||
Certified Public Accountants and Business Consultants
1 of 2
Maillie
Expertise Beyond The Numbers
6/23/2014
2:37 PM
Client: 2500 - East Goshen Municipal Authority
Engagement: 2013 - East Goshen Municipal Authority
Period Ending: 12/31/2013
Trial Balance: TB-Municipal Authority
Workpaper: 3510MA05 - Adjusting Journal Entries Report
| Account | Description | W/P Ref | Debit | Credit |
|---|---|---|---|---|
| Adjusting Journal Entries JE # 108 | 4200MA05 | |||
| To record net investment in lease related to 2013 note issuance | ||||
| 07-100-1900 | Lease payment receivable | 2,500,000.00 | ||
| 07-100-1910 | RESERVE FOR FUTURE CAPITAL EXPENDITURES | 2,500,000.00 | ||
| Total | 2,500,000.00 | 2,500,000.00 | ||
| Adjusting Journal Entries JE # 109 | 4200MA05 | |||
| To adjust for capital costs capitalized on Sewer Operating Fund (Township) | ||||
| 07-100-1910 | RESERVE FOR FUTURE CAPITAL EXPENDITURES | 601,758.00 | ||
| 07-426-1000 | HERSHEY MILL STATION - ENGINEER | 23,303.00 | ||
| 07-426-2000 | HERSHEY MILL STATION - CONSTRUCTION | 167,013.00 | ||
| 07-428-1000 | RESERVOIR PUMP STATION - ENGINEER | 7,023.00 | ||
| 07-428-1000 | RESERVOIR PUMP STATION - ENGINEER | 38,447.00 | ||
| 07-472-1000 | M.C.-DVRFA-INTEREST PAYMN | 365,972.00 | ||
| Total | 601,758.00 | 601,758.00 | ||
| Adjusting Journal Entries JE # 110 | 9554MA | |||
| To record note payable and loan fees for 2013 issuance | ||||
| 07-393-1001 | LOAN PROCEEDS-SEWER PROJECT | 2,477,000.00 | ||
| 07-424-5850 | Loan fees | 23,000.00 | ||
| 07-200-2502 | NOTE PAYABLE - 2013 | 2,500,000.00 | ||
| Total | 2,500,000.00 | 2,500,000.00 | ||
Certified Public Accountants and Business Consultants
2 of 2
8. GOALS
- Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014 May 8 – The MA does not have a current mission statement. A first draft is included in the packet. June 9 – Changed “lease” to “leasee” Approved by MA on June 9 - Completed
- Submit an article for each newsletter – Due date for newsletter Need by 1/31/14 – Dana Completed Need by 4/30/14 – Jack Completed Need by 7/1/14 - Kevin Need by 10/31/14
- Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014 May 8 - Revisions submitted to EGMA, EGPC, WGSTP, CCHD, and CCPC July 14 – BOS scheduled to adopt resolution at their meeting on August 19
- Develop a recommendation on covers for the SBRs – August 1, 2014 May 8 – Draft memo distributed. June 9 – Final memo in packet - Completed
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack- Completed 2 nd Quarter (June) – Ed- Completed 3 rd Quarter (September) 4 th Quarter (December)
- Respond to capacity requests in 45 days or less. 211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house
- Continue to implement I & I Plan April 14 – Status Report received
- Operate RCSTP in compliance with NPDES Permit January, February, March, May,
F:\Data\Shared Data\Agendas\Municipal Authority\2014\7-14-14 -.doc
INTEGRATED LAND MANAGEMENT, INC.
July 9, 2014
Mr. Louis F. Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
RE: Proposed Tie-in to East Goshen Sewers,
Troutbeck Farm, Willistown Township
Dear Mr. Smith,
I am writing on behalf of the Chance Family Trust and Estate, of which I am a member. Pursuant to our conversation last year, I am writing to make a formal request to East Goshen Township for the provision of Sewer Services to the above captioned property. As shown on the enclosed Location Plan, our property comprises approximately 68 acres.
It is located 1,100 feet east of Hickory Lane, which is where the Willow Pond Subdivision is located. Presently treated by East Goshen Township, 13 lots of this subdivision are actually located in Willistown. Being in the Ridley Creek watershed, I understand that these lots are treated by the Ridley Creek WWTP.
Given the current inter-township arrangements for the Willow Pond lots, there is ample precedent for bringing in additional Willistown properties in the same watershed. We would request to bring on line an additional 44 D.U., of which 4 presently exist. The balance represents platted vacant lots or proposed lots. At 275 gpd per D.U., this represents 12,100 gpd. When we spoke, East Goshen had approximately 50,000 gpd in surplus allocation, so I trust that this request will be favorably received.
As you mentioned, there is the meeting of the Board on Monday when this request will be considered, and I will be able to attend to answer any questions. In the meantime, please let me know if you need any more information at this time. I thank you in advance for your consideration.
Regards,
William Lucas
cc: Gerald Lucas
Lillie Chance
3 LUCAS LANE, MALVERN, PA 19355
o: 610-644-0606 f: 610-644-6583 c: 484-995-6840
Aerial photograph with parcel lines and parcel labels showing a red-outlined subject property of mostly open field and woods, with a blue line along a road ending at a red arrow.
Annotations and Labels:
Subject Property 43 D.U. (red boxed label)
Tie into ex. MH (red boxed label with arrow, at the end of the blue sewer line)
Streets: Salisbury LA, Stonehenge LA, Frost Pond LA, Druid LA, Skyline DR, Quarterwood RD, Tiburon LA, Willow Pond RD, Tramore Ct
Parcel labels include: 54-2-41.4A (23.43 AC.), 54-2-41.4 (10.4 AC.), 54-2-1 (28.87 AC.), 54-2-41.4E (1.13 AC.), 54-2-41.4D (1.07 AC.), 54-2-41.4C (1.07 AC.), 54-2-41.4B (1.07 AC.), 54-2-41.6B (1.1 AC.), 54-2-41.6C (1.1 AC.), 54-2-41.5A (1.1 AC.), 54-2-1.2 (3 AC.), 54-2-41.1 (2.1 AC.), 54-2-41.3E (1.71 AC.), 54-2-41.3D (1.07 AC.), 54-2-41.3C (1 AC.), 54-2-41.3B (1 AC.), 54-2-41.3A (1.52 AC.), 54-2-70.1 (2.1 AC.), 54-2-70.2 (2.9 AC.), 54-2-70.3 (2.3 AC.), 54-2-70.10 (2 AC.), 54-2-70.11 (2 AC.), 54-2-71 (2.1 AC.), 54-2F-23 (3.0 AC.), and many smaller parcels too small to read reliably.
[Seal: SEAL OF CHESTER COUNTY PENNSYLVANIA] [Seal: CHESTER-WILLIAM PENN PROPRIETOR AND GOVENOR]
THE COUNTY OF CHESTER
COMMISSIONERS
Ryan Costello
Kathi Cozzone
Terence Farrell
JEANNE CASNER, MPH, PMP
County Health Director
CHESTER COUNTY HEALTH DEPARTMENT
Water and Sewage Division
Chester County Government Services Center
601 Westtown Road, Suite 288
West Chester, PA 19380-0990
610-344-6526 FAX: 610-344-5934
www.chesco.org/health
[Stamp: RECEIVED JUL 01 2014]
June 23, 2014
East Goshen Township Municipal Authority
East Goshen Township Building
1580 Paoli Pike
West Chester, PA 19380
RE: East Goshen Township
Minor Act 537 Plan Update Revision
Reservoir Road Pump Station
Dear Mr. Yahraes,
The Chester County Health Department (CCHD) is in receipt of the above noted Act 537 Plan Revision document. This Minor Revision was prepared by Pennoni Associates and dated May, 2014. It was received by CCHD on May 12, 2014 and has been reviewed in accordance with Title 25, Environmental Protection, Chapter 71, Administration of Sewage Facilities Planning Program, Chapter 71 § 71.31.(b.). We offer the following comments:
- The Reservoir Road Pump Station, as described in this plan update, is the final phase of an ongoing plan to divert sewage from the Chester Creek Interceptor to the Ridley Creek Sewage Treatment Plant. This diversion will reduce wastewater flow from East Goshen to the West Goshen Sewage Treatment Plant.
- This pump station was included in the design of recent upgrades to the Ridley Creek Sewage Treatment Plant and will increase operating efficiency and improve plant function, among other advantages.
- Additional sewage treatment capacity to satisfy future needs in areas continuing to be served by the Chester Creek Interceptor will become available.
- PA DEP had no objections to this diversion scheme and approved the Plan of Study on August 9, 2013.
CCHD has no objection to East Goshen Township Municipal Authority implementing the provisions of this plan.
“Protecting You and Your Environment”
East Goshen Municipal Authority
Minor Act 537 Plan Update Revision
Reservoir Road Pump Station
June 23, 2014
Thank you for the opportunity to review this Act 537 Plan Update Revision. Please do not hesitate to contact me with any questions at 610-344-6239
Sincerely,
[Signature: Ralph E. DeFazio]
cc: Rick Smith, East Goshen Township Manager
Michael J. Ellis, East Goshen Municipal Authority Engineer
Elizabeth Mahoney, PA DEP
CCPC
file
“Protecting You and Your Environment”
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 16, 2014
John M. Scott, Plant Manager
West Goshen Wastewater Treatment Plant
848 South Concord Road
West Chester, PA 19382
Re: Act 537 Plan Revision
Reservoir Road Pump Station
East Goshen Township, Chester County, PA
Dear John:
I am in receipt of Max Stoner’s letter of June 9, 2014. Mike Ellis and I discussed your concerns with the East Goshen Municipal Authority at their meeting on June 9, 2014 and in response would offer the following:
The 1977 Agreement between the two Townships and two Authorities has two sections that are relevant.
Section 3.03a Delivery of Sewage Wastes states “...no Sewage Wastes from any parties Sewage Collection System shall be diverted directly or indirectly, to another treatment facility until the Reserved Capacity is reached; provided, however, that any flows from portions of the East Goshen collection System, originating outside the drainage basin of the Chester Creek may be diverted at any time at the sole options of East Goshen Authority or East Goshen as Lessee, upon giving 90 days written notice of such diversion to West Goshen and West Goshen Authority.”
Section 10.01 Penalty of the Agreement notes that if one of the parties exceeds their Reserved Capacity the operator of the receiving facility may impose a penalty of 25% of the costs. The penalty increases to 50% after 120 days.
In 2013 our average daily flow to West Goshen was 827,646 gpd. However, the monthly average for February of 2013 was 1,004,657 gpd and in June of 2013 it was 1,057,984 gpd. The average for the first quarter of 2014 is 873,715 gpd.
My concern is that East Goshen does not want to be in a position in which we are over our 1,000,000 gpd limit at West Goshen for an extended period of time and therefore be subject to the penalty set forth in Section 10.01.
We estimate that it would take nine months to bid and construct the Reservoir Road Pump Station.
Our plan is to obtain the Act 537 Plan approval and the other permits required for the Reservoir Road Pump Station. Once we have these in hand we would then wait to construct the Pump Station until if and when it looks like we will exceed 1,000,000 gpd at West Goshen. Since you invoice us quarterly, I would suggest that we begin the construction process when there are two consecutive quarters in which the “average daily flow” exceeds 950,000 gpd. The pump station will not be placed in service until we have reached 1,000,000 mgd. If this is acceptable to you I will have Mike revise the project schedule to reflect this.
I would add that it is less expensive for us to treat wastewater at West Goshen than at Ridley, so we do not intend to divert flow until we absolutely have to and, we would not want to divert more than needed in order to keep us under 1,000,000 gpd.
With respect to the other projects in Max’s letter both New Kent Apartments and the homes served by Hershey Mill Pump Station are outside of the Chester Creek drainage basin so the diversions are permitted pursuant to Section 3.03.
The homes served by the Marydell Pump Station were in the Chester Creek drainage basin and we appreciate your cooperation with that project. The pump station was literally on its last legs when we took it out of service.
If you have any questions, or think it would be helpful, Jack Yahraes, Authority Chairman; Mike Ellis and I would be happy to attend your Authority meeting on July 2, 2014
Sincerely,
[Signature: Rick]
Louis F. Smith, Jr.
Township Manger
F:\Data\Shared Data\ABC'S\Municipal Authority\Projects\Reservoir Road PS\Act 537 Plan\Letter to West Goshen 061614.docx