Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
June 9, 2014
Monday 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s; East Goshen Township Flows for May 2014
  4. APPROVAL OF MINUTES May 21, 2014
  5. APPROVAL OF INVOICES Item Payee Invoice # Amount a. Pennoni Invoice #591749 $ 619.75 b. Pennoni Invoice #591750 $5,761.25 c. Pennoni Invoice #591751 $1,766.75 d. Gawthrop Invoice #119419 $1,300.00
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS May 2014 Report
  8. OLD BUSINESS
  9. GOALS Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014 May 8 – The MA does not have a current mission statement. A first draft is included in the packet. June 9 – Changed “lease” to “leasee”; Submit an article for each newsletter – Due date for newsletter Need by 1/31/14 – Dana Completed Need by 4/30/14 – Jack Completed Need by 7/1/14 - Kevin Need by 10/31/14

F:\Data\Shared Data\Agendas\Municipal Authority\2014\6-9-14.doc

  1. Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014 May 8 - Revisions submitted to EGMA, EGPC, WGSTP, WGPC, CCHD, and CCPC
  2. Develop a recommendation on covers for the SBRs – August 1, 2014 May 8 – Draft memo distributed. June 9 – Final memo in packet
  3. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack- Completed 2 nd Quarter (June) – Ed- Completed 3 rd Quarter (September) 4 th Quarter (December)
  4. Respond to capacity requests in 45 days or less. 211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house
  5. Continue to implement I & I Plan April 14 – Status Report received
  6. Operate RCSTP in compliance with NPDES Permit January, February, March, May
  1. NEW BUSINESS Authorize Chairman to execute sewer connection agreement for 195 Wyllpen Place
  2. CAPACITY REQUESTS None
  3. ANY OTHER MATTER
  4. CORRESPONDENCE AND REPORTS OF INTEREST Fairway Village rehabilitating the sanitary sewer manhole
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2014\6-9-14.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 4, 2014

Field Value
To: Municipal Authority
From: Mark Miller
Re: May 2014 Monthly Report

Meters: All meters were read on a daily basis. The two portable meters have not arrived yet; as they come in we will get them installed. The new meters have the capabilities of sending out the reading thru the internet. I have asked Allied to give ma a cost to modify our meters to allow us to get the readings over the internet for the 2015 budget.

C.C. Collection: The pump station wet wells were cleaned last week. The wet well at Barkway pump station had several leaks; we packed the leaks and pumped 60 gallons of grout into them to seal the leaks. The pumps are scheduled to be pulled for routine maintenance next week. We repaired a broken lateral on Red Maple Lane; last Monday the lateral line sheared off which was allowing heavy inflow into the system.

R.C. Collection: The Hunt Country pump station was visited on a routine basis with no problems to report. The wet well was cleaned last week.

R.C. Plant: The wet well was cleaned last week, we are scheduled to re-install the lift station pump next week and pull another for routine maintenance.

Alarms: We responded to 21 alarms for the month of May.

PA One Calls: We received 116 PA One calls in May.

EGMA 1401

Pennoni

MEMORANDUM

Field Value
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: June 5, 2014
SUBJECT: Engineer’s Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Pennoni continues to provide operations assistance as needed. No operational issues were brought to our attention in May.

Reserve Pump Station Elimination

  • There are three outstanding punchlist items at the time of this report: removal of the filter sock along the creek, re-seeding/re-topsoiling the lawn area at the old pump station driveway and building, and resubmission of as-built plans with surveyed manhole elevations. The contractor has informed us that they have visited the site to evaluate the work to be performed, and they are hopeful to complete the work by June 13.

Reservoir Road Pump Station Act 537 Plan

  • We are awaiting Act 537 Plan review forms to be completed and returned from the East Goshen Township Planning Commission, West Goshen Township Planning Commission, Chester County Planning Commission, Chester County Health Department, and West Goshen Sewage Treatment Plant operator. Reviews are due by July 9, 2014.
  • Based upon the revised force main routing and additional information that we submitted, the PA Department of Conservation and Natural Resources (DCNR) retracted their requirement for a field botanical survey of potential threats to certain plant species.
  • We are awaiting feedback from the U.S. Fish & Wildlife Service on the Phase 1 bog turtle habitat survey report that was submitted by Conestoga-Rovers & Associates in late April.

Page 1 of 2
P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-06-05.docx

EGMA 1401

  • Tentative Act 537 Planning schedule (assuming no Phase 2 bog turtle screening): Milestone Estimated Date USFWS Bog Turtle Habitat Coordination June 30, 2014 County and Township Agency Review Comments Due July 9, 2014 Revisions per Agency Comments July 14, 2014 30-Day Public Comment Period August 15, 2014 East Goshen Township Adoption August 19, 2014 PADEP Review and Approval (120 days) December 21, 2014

New Sewer Connections

  • We completed a review of the design plan and report submission for a new private wastewater pump station for Acero Precision at 1340 Enterprise Drive, issued a comment letter, and discussed comments with the design consultant.

Fairway Village Manhole Lining

  • Abel Recon will perform the demonstration of the SprayWall monolithic polyurethane interior manhole lining system on June 10, 2014. The demonstration will begin at 11:00 a.m. at the site.

RCSTP Tank Covers

  • We completed the evaluation of tank cover alternatives and forwarded an updated summary memo to the Township.

Page 2 of 2
P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-06-05.docx

Big Fish Environmental Services Inc.

Monthly Operations Report: May 2014

Treatment Process Operation

During April 2014, there was one exceedance of the final effluent discharge limitations for outfall 001 and no discharge from Outfall 002. The exceedance reported was a total phosphorus monthly average concentration of 0.54 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the April 2014 eDMR.

Table 1
April 2014 - Final Effluent - Out Fall 001

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus, Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
200 1,000
0.75 20 125 21 131 7 44 0.5 3
Instantaneous Maximum 40 42
Sample Date
April 1, 2014 0.512 4.2 17.9 8 34 1.39 5.94 0.49 2.09 1 0.0000
April 8, 2014 0.508 4.9 20.8 10 42 0.12 0.53 0.68 2.88 1 0.0000
April 15, 2014 0.692 3.5 20.20 8 46 0.25 1.45 0.50 2.89 1 0.0000
April 22, 2014 0.458 4.3 16.42 7 27 0.55 2.10 0.48 1.83 1 0.0000
April 24, 2014 0.409 NS NS NS NS NS NS 0.39 1.33 NS NS
April 25, 2014 0.406 NS NS NS NS NS NS 0.61 2.07 NS NS
April 27, 2014 0.469 NS NS NS NS NS NS 0.51 2.0 NS NS
April 29, 2014 0.549 NS NS NS NS NS NS 0.66 3.0 NS NS
Average 0.500 4.2 18.8 8 37 0.579 2.50 0.54 2.15 1 0.0000
Minimum 0.406 3.5 16.4 7 27 0.124 0.53 0.39 1.33 1 0.0000
Maximum 0.692 4.9 20.8 10 46 1.390 5.94 0.68 2.89 1 0.0000

The monthly average total phosphorus concentration was 0.54 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.39 mg/L to 0.68 mg/L with an average of 54.3 gallons per day of aluminum sulfate solution.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 7

Big Fish Environmental Services Inc.

There was no discharge to Applebrook, Outfall 002, during April 2014.

Table 2 illustrates the influent wastewater pollutant loadings for April 2014. The influent loadings remained within the treatment facility design loadings.

Table 2
April 2014 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
April 1, 2014 0.464 160 619 136 526 25.9 100 36.1 140 4.8 19
April 8, 2014 0.562 177 685 224 867 25.3 98 39.6 153 4.0 15
April 15, 2014 0.446 124 480 44 170 22.4 87 35.7 138 4.3 17
April 22, 2014 0.592 184 712 132 511 24.4 94 39.0 151 4.5 17
April 29, 2014 0.558 216 836 228 882 35.2 136 47.1 182 5.7 22
Average 0.524 172 666 153 591 26.6 95 39.5 153 4.4 17
Minimum 0.446 124 480 44 170 22.4 87 35.7 138 4.0 15
Maximum 0.592 216 836 228 882 35.2 100 47.1 182 4.8 19

During the month of April 2014, the total phosphorus concentrations at the final effluent outfall 001 were slightly elevated at or above the permitted discharge limitation of 0.5 mg/L. Aluminum sulfate feed rates were increased as the month progressed to assist with total phosphorus removal. Periodically, the influent flow rate and volume to the SBRs resulted in “Filled Decants.” The Filled Decant condition results in diverting a mixture of influent wastewater and treated effluent directly to the post flow equalization basins, disc filters and disinfection prior to discharge through outfall 001.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 7

Big Fish Environmental Services Inc.

Table 3 presents the final effluent data for the month of May 2014. There are no anticipated exceedances of the permitted limitations for the month of May.

Table 3
May 2014 - Final Effluent - Out Fall 001

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus, Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
200 1,000
0.75 20 125 21 131 7 44 0.5 3
Instantaneous Maximum 40 42
Sample Date
May 6, 2014 0.475 5.2 20.6 6 24 1.23 4.87 0.32 1.27 2 0.3010
May 13, 2014 0.480 3.7 14.8 6 24 1.89 7.57 0.20 0.80 1 0.0000
May 20, 2014 0.353 3.2 9.42 7 21 2.50 7.36 0.27 0.79 3 0.4771
May 27, 2014 0.430 0.23 0.82
Average 0.435 4.0 14.9 6 23 1.873 6.60 0.26 0.92 2 0.2594
Minimum 0.353 3.2 9.4 6 21 1.230 4.87 0.20 0.79 1 0.0000
Maximum 0.480 5.2 20.6 7 24 2.500 7.57 0.32 1.27 3 0.4771

During May 2014, there was no discharge to Applebrook.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 7

Big Fish Environmental Services Inc.

Table 4
May 2014 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
May 6, 2014 0.469 67.9 266 148 579 23.0 90 33.5 131 3.7 14
May 13, 2014 0.436 280 1,096 168 657 29.9 117 38.2 149 4.0 16
May 20, 2014 0.309 212 830 202 791 29.0 113 37.4 146 5.3 21
May 27, 2014 0.426
Average 0.410 187 730 173 676 27.3 107 36.4 142 4.3 17
Minimum 0.309 68 266 148 579 23.0 90 33.5 131 3.7 14
Maximum 0.469 280 1096 202 791 29.9 117 38.2 149 5.3 21

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of May.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remain reduced during the month of April. Increased sludge wasting was continued to maintain lower the MLSS concentrations. SBRs numbered 3 and 4 were observed to have a maximum of 5% to 10% of the surface area covered with a medium brown colored foam. Adjustments to the treatment process to lower the MLSS concentrations and raise the F:M ratio within the target range of 0.045 to 0.06 were ongoing during the month. Process adjustments to manage the foam included adjustments for achieving the lower ammonia as nitrogen discharge concentration of 2.5 mg/L as compared to the 7.0 mg/L during April.

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 7

Big Fish Environmental Services Inc.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was increased from a daily average of 54.3 gpd during April to 82.6 gpd during May to assist with total phosphorus removal. Increased aluminum sulfate dosages prior to filtration were increased during the month. The increase in alum addition resulted in an increase in soda ash addition. During May the daily average soda ash addition was 439 lbs/day as compared to the April daily average of 308 lbs/day. The increase in soda ash was to assist towards maintaining pH concentrations above 7.0 standard units continued during the month.

SBR No. 2 remains out of service as a treatment unit, however, partially filled with MLSS which continuously mixed and aerated. The majority of the contents were transferred to the sludge holding tanks. This SBR was periodically placed in service to assist with managing peak flows to reduce the impact of Filled Decant conditions.

The decanter for SBR 3 was occasionally observed as being slightly tilted within the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The frequency of occurrence varied during the month. The SBR is planned for removal from service during late June for inspection.

Flow data:

May 2014
Flow Meter Location Total Volume for Month, MGD Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 15.147 488,607 764,220
Influent Wastewater to SBRs 16.954 546,908 873,032
Internal Recycle 1.848 59,616 136,420
Treated Effluent to Disc Filters 16.547 533,761 913,056
Final Effluent Discharge 15.185 489,839 837,000
Applebrook Golf Course 0 0 0

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 7

Big Fish Environmental Services Inc.

Chemical Usage:

Chemical May 2014
Daily Average Total Monthly
Soda Ash 439 13,600
Magnesium Hydroxide 0 0
Aluminum Sulfate solution 82.6 2,561
Polymer (centrifuge) 0.86* 14 gallons

*Fifteen (15) days of centrifuge operation

Solids Dewatering and Disposal: May 2014

Sludge Dewatering Summary
Gallons of sludge dewatered 223,310 gallons
Average Dewatered Total Solids, % 19.7%
Wet Tons 33.7
Dry Tons 6.593
Number of dumpsters 4

*A total of four (4) dumpsters were filled and three (3) dumpsters were removed during May.

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of the month was 7.44 feet and the level at the end of the month was 11.72 feet. The initial total solids concentration was 0.62% and ended the month as 0.73% total solids. The average pH concentration was 7.30 S.U. and total alkalinity of 386 mg/L. No supernatant was decanted during the month. A total of 1,000 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 14.39 feet and the level at the end of the month was 13.99 feet. The initial total solids concentration were 0.97% and ended the month as 0.80% total solids. The average pH concentration was 7.38 S.U. and total alkalinity of 490 mg/L. 83,626 gallons of supernatant were decanted during the month. A total of 100 pounds of soda ash were added during the month for pH adjustment.

Significant Storm/Hydraulic Loading Events

None were experienced past May 2, 2014.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 7

Big Fish Environmental Services Inc.

Minor Repairs and Preventative Maintenance

  • Replaced the inlet air filters for blowers B1A, B1B, B1C and B2.
  • Replaced the suction and pump tubing for the influent samplers and final effluent sampler. The final effluent suction tubing is replaced monthly.
  • Replaced the pump hose on alum feed pump.
  • Cleaned and calibrated SBR LDO probes.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 7

2013 FLOWMETERS

2014 MAY 2ND QUARTER METERS FROM WEST GOSHEN - CC COLLECTION

Precip WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT NET
1000 10 10 10
Inches DATE READING GPD READING GPD READING GPD READING GPD GPD FLOWS
0.1 05/01/14 1,663,200 2,627,000 4,860,107 285,370 2,951,705 189,230 1,376,738 132,960 24,000 2,019,440
0 05/02/14
0.05 05/03/14
0 05/04/14
0 05/05/14 1,669,690 1,622,500 4,941,499 203,480 2,991,029 98,310 1,422,664 114,815 24,000 1,205,895
0 05/06/14
0 05/07/14 1,672,404 1,357,000 4,973,060 157,805 3,007,028 79,995 1,446,087 117,115 24,000 1,002,085
0.03 05/08/14
0 05/09/14 1,675,931 1,763,500 5,003,129 150,345 3,022,741 78,565 1,474,051 139,820 24,000 1,394,770
0.35 05/10/14 flows high due to West Goshen working on pump station
0 05/11/14
0 05/12/14 1,679,636 1,235,000 5,046,624 144,983 3,045,310 75,230 1,492,141 60,300 24,000 954,487
0.3 05/13/14 1,680,885 1,249,000 5,060,854 142,300 3,053,606 82,960 1,500,391 82,500 24,000 941,240
0 05/14/14 1,682,164 1,279,000 5,075,264 144,100 3,061,876 82,700 1,507,792 74,010 24,000 978,190
0.35 05/15/14 1,683,450 1,286,000 5,088,982 137,180 3,069,301 74,250 1,519,386 115,940 24,000 958,630
0 05/16/14
0 05/17/14
0.3 05/18/14
0 05/19/14 1,689,241 1,447,750 5,160,633 179,128 3,117,949 121,620 1,545,477 65,228 24,000 1,081,775
0 05/20/14 0
1.85 05/21/14 1,691,783 1,271,000 5,190,478 149,225 3,132,731 73,910 1,557,379 59,510 24,000 988,355
0 05/22/14 1,694,636 2,853,000 5,224,892 344,140 3,150,005 172,740 1,572,594 152,150 24,000 2,183,970
0 05/23/14 0
0 05/24/14 0
0.03 05/25/14 0
0.05 05/26/14 0
0.25 05/27/14 0
0.15 05/28/14 1,700,777 1,023,500 5,299,335 124,072 3,186,335 60,550 1,599,276 44,470 24,000 794,408
0.5 05/29/14 1,702,090 1,313,000 5,314,051 147,160 3,194,008 76,730 1,607,026 77,500 24,000 1,011,610
0 05/30/14 1,703,353 1,263,000 5,328,279 142,280 3,201,402 73,940 1,615,695 86,690 24,000 960,090
0.00 05/31/14
4.56 Day Avg 1,542,161 175,112 95,766 94,501 24,000 823,747
Day Tot 21,590,250 2,451,568 1,340,730 1,323,008 336,000 ##########
Day Count 14 14 14 14 14 20
EG TWP
MONTH TO DATE 4.56
NORMAL MONTH TO DATE
YEAR TO DATE 22.63
NORMAL YEAR TO DATE (DL)

f: Data/Shared Date/Public Works/flowmeters/2014 flowmeters -all-stations separate month worksheets.xlsx      6/4/20148:44 AM

2013 FLOWMETERS

2014 MAY 2ND QUARTER- CC COLLECTION- METERS FROM WEST GOSHEN

HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR BARKWAY
10 100 10 10 10
DATE READING GPD READING GPD READING GPD READING GPD READING GPD
05/01/14 9,937,750 2,236,230 1,880,120 319,200 11,507,543 714,090 46,741,333 1,507,800 3,178,894 33,960
05/02/14
05/03/14
05/04/14
05/05/14 10,820,104 2,205,885 1,885,689 139,225 11,645,292 344,373 47,145,067 1,009,335 3,199,666 51,930
05/06/14
05/07/14 11,162,242 1,710,690 1,887,853 108,200 11,712,929 338,185 47,320,250 875,915 3,206,541 34,375
05/08/14
05/09/14 11,487,417 1,625,875 11,824,880 559,755 47,491,244 854,970 3,211,826 26,425
05/10/14
05/11/14
05/12/14 11,833,278 1,152,870 1,892,319 89,320 11,896,068 237,293 47,713,149 739,683 3,216,600 15,913
05/13/14 11,944,278 1,110,000 1,893,137 81,800 11,926,033 299,650 47,794,370 812,210 3,217,899 12,990
05/14/14 12,048,146 1,038,680 1,893,982 84,500 11,955,968 299,350 47,873,793 794,230 3,219,092 11,930
05/15/14 12,146,810 986,640 1,894,798 81,600 11,987,486 315,180 47,954,166 803,730 3,220,328 12,360
05/16/14
05/17/14
05/18/14
05/19/14 12,584,161 1,093,378 1,899,032 105,850 12,102,153 286,668 48,300,057 864,728 3,226,842 16,285
05/20/14
05/21/14 12,776,938 963,885 1,900,706 83,700 12,158,817 283,320 48,457,033 784,880 3,229,180 11,690
05/22/14 12,972,539 1,956,010 1,902,698 199,200 12,225,622 668,050 48,637,552 1,805,190 3,231,932 27,520
05/23/14
05/24/14
05/25/14
05/26/14
05/27/14
05/28/14 13,455,175 804,393 1,907,041 72,383 12,247,967 37,242 49,006,205 614,422 3,238,665 11,222
05/29/14 13,550,215 950,400 1,907,867 82,600 12,279,491 315,240 49,089,987 837,820 3,239,993 13,280
05/30/14 13,639,272 890,570 1,908,652 78,500 12,310,582 310,910 49,171,490 815,030 3,241,106 11,130
05/31/14
1,337,536 117,391 357,808 937,139 20,786
18,725,506 1,526,078 5,009,305 13,119,943 291,010
14 13 14 14 14

f: Data/Shared Date/Public Works/flowmeters/2014 flowmeters -all-stations separate month worksheets.xlsx      6/4/20148:44 AM

2014 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR BARKWAY
JANUARY 1,120,955 112,631 63,436 80,890 24,000 255,116 795,376
FEBRUARY 1,249,173 138,449 68,472 88,803 24,000 287,831 881,433
MARCH 1,182,533 126,933 67,479 84,197 24,000 860,074 75,186 291,520 827,109 28,696
APRIL 1,242,798 143,329 76,736 88,674 24,000 1,029,229 79,139 300,256 806,253 12,331
MAY 1,542,161 175,112 95,766 94,501 24,000 1,337,536 117,391 357,808 937,139 20,786
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave 1,584,405 174,114 92,972 109,266 30,000 1,613,420 135,858 373,133 1,061,828 30,907
Destination Flow
To West Goshen 1,208,053

2014 flowmeters -all-stations separate month worksheets.xlsxSUMMARY

May Precip. 4.56 - 2014

Chart, printed rotated 90 degrees: a 3-D vertical bar chart titled “May Precip. 4.56 - 2014”. The vertical axis is labeled “Precip.” with values from 0 to 2. The horizontal axis is labeled “snow/rain” with categories numbered 1 through 32 representing days of the month.

Day Approximate bar value
1no bar
2about 0.1
3no bar
4about 0.05
5 to 8no bar
9about 0.3
10no bar
11about 0.35
12 to 13no bar
14about 0.3
15 to 16no bar
17about 1.85
18 to 20no bar
21about 0.3
22about 0.5
23about 1.25
24about 0.15
25 to 27no bar
28about 0.25
29about 0.15
30 to 32no bar

Legend: May (blue).

2013 Monthly Precipitation

Chart, printed rotated 90 degrees: a horizontal 3-D bar chart titled "2013 Monthly Precipitation". The value axis runs from 0 to 8 (no unit printed). The category axis lists January through December. Only January through May have bars; June through December are empty.

MonthApproximate bar value
Januaryabout 3.9
Februaryabout 2.9
Marchabout 3.7
Aprilabout 7.6
Mayabout 4.7
June to Decemberno bar

Legend: Series1 (blue).

Flowmeters May 2014

Chart, printed rotated 90 degrees: a line chart with diamond markers titled "Flowmeters May 2014". The horizontal axis is "Day of the month" (1 to 30); the value axis is labeled "Flow's" and runs from 0 to 2500000 in steps of 500000. The line alternates between zero and peaks.

  • Peaks (approximate): day 1 about 2,000,000; day 5 about 1,200,000; day 7 about 1,000,000; day 9 about 1,400,000; days 12 to 15 about 950,000; day 19 about 1,100,000; day 21 about 1,000,000; day 22 about 2,200,000; day 28 about 800,000; day 29 about 1,000,000; day 30 about 950,000.
  • Zero flow on days 2, 3, 4, 6, 8, 10, 11, 16, 17, 18, 20 and 23 through 27.

Legend: May (blue line with diamond marker).

Monthly Totals 2012 Jan-Dec

Chart, printed rotated 90 degrees: a horizontal clustered bar chart titled "Monthly Totals 2012 Jan-Dec" on a light blue plot area. The value axis is labeled "Flowmeters" and runs from 0 to 2500000 in steps of 500000. The category axis is labeled "Month" and lists January through December. January through May each contain a cluster of many thin bars (one per day), mostly between about 800,000 and 1,200,000, with the longest bars in May (about 2,000,000 and 2,200,000). June through December are empty. No legend is printed.

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

May 12, 2014

The East Goshen Township Municipal Authority held their regular public meeting on Monday, May 12, 2014 at 7:00 pm at the East Goshen Township building. Members in attendance were: Vice Chairman Kevin Cummings, Fran Beck, Dana Pizarro, and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Supervisor), Patrick McKenna (Attorney), Scott Towler (BFES), and Mike Ellis (Pennoni).

COMMON ACRONYMS:

  • BFES – Big Fish Environmental Services
  • BOS – Board of Supervisors
  • CB – Conservancy Board
  • DEP – Department of Environmental Protection
  • EPA – Environmental protection Agency
  • HC – Historical Commission
  • I&I – Inflow & Infiltration
  • LCSTP – Lockwood Chase Sewer Treatment Plant
  • MA – Municipal Authority
  • NPDES – National Pollutant Discharge Elimination System
  • PC – Planning Commission
  • PR – Park & Recreation Board
  • RCSTP – Ridley Creek Sewer Treatment Plant
  • SBR – Sequencing Batch Reactor
  • SSO – Sanitary System Overflow
  • WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Kevin asked if anyone would be recording the meeting and there was no response.

Chairman's Report/Other Members' Reports

None

Sewer Reports

1. Director of Public Works

Mark Miller reported for April 2014:

Meters: All meters were read on a daily basis. After the heavy rain last week, we walked the interceptor line and pulled manholes to do a visual inspection. The new portable meters have been ordered and the others were sent for calibration.

CC Collection: All pumping stations were visited on a daily basis. We did not incur any problems during the month. We assisted West Goshen last Wednesday night into Thursday morning. They had to shut down the Westtown Way Pump Station for repairs. We had to plug the interceptor line throughout the night to regulate the flow.

RC Collection: The pumping stations were visited on a routine basis with no problems to report. We have been repairing laterals on both systems from missing caps to broken stack pipes.

RC Plant: All the wet well pumps have been pulled out for routine maintenance. We will now begin to pull the SBR pumps for maintenance.

Alarms: We responded to 73 alarms for the month of April.

PA One Calls: We received 123 PA calls in April.

Rick added that the Falcon Lane Pump Station had to be taken out of service for 1 day last week.

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 5-12-14 draft.doc

1

2. Pennoni Engineer's Report

Mike Ellis submitted the following report:

Invoices: Invoices with summaries are provided under separate cover.

Ridley creek Sewage treatment Plant (RCSTP): Pennoni continues to provide operations assistance as needed. No operational issues were brought to our attention in April.

Reserve Pump Station Elimination: The contractor has provided all of the required contract closeout documents; however, we have not yet reviewed the as-built plans as of the date of this memo (5/8). We intend to review the plans prior to the May 12 Municipal Authority meeting. There are 2 outstanding punchlist items that still need to be addressed: removal of the filter sock along the creek and re-seeding/re-topsoiling the lawn area at the old pump station driveway and building. We have reviewed the other submitted closeout documents and final payment request. We have certified the final payment request and forwarded it to the Township with a recommendation that payment be approved but the check not issued until the as-built plans have been reviewed and the punchlist work has been completed to the Township's satisfaction.

Reservoir Rd Pump Station Act 537 Plan: Conestoga-Rovers & Associates (CRA) finalized the Phase 1 bog turtle habitat assessment report and submitted it to the U.S. Fish & Wildlife Service (USFWS) in late April

We finalized the Act 537 plan report and plot plans. The Act 537 Plan was submitted to the East Goshen Township Planning Commission, West Goshen Township Planning Commission, Chester County Planning Commission, Chester County Health Department, and West Goshen Sewage Treatment Plant operator on May 8, 2014. The agencies are allotted 60 days to review and provide comments per PADEP Act 537 guidelines. A copy was also submitted to the Municipal Authority to sign Section K of Component 3m.

As previously reported, the PA Dept. of Conservation and Natural Resources (DCNR) is requiring a field botanical survey of potential threats to four special concern plant species. We have discussed whether the survey is still required with DCNR given the revised force main routing and revised PNDI search that returned no DCNR conflicts. We have submitted documentation of the revised force main routing to DCNR, and we expect to receive feedback from them by May 12.

Tentative Act 537 Planning schedule (assuming no botanical survey or Phase 2 bog turtle screening):

MilestoneEstimated Date
Submit to County & Township agenciesMay 8, 2014
USFWS Bog Turtle Habitat CoordinationJune 22, 2014
60-day County & Township Review PeriodJuly 8, 2014
Revisions per agency commentsJuly 11, 2014
30-Day Public Comment PeriodAugust 11, 2014
East Goshen & West Goshen Twp. AdoptionAugust 19, 2014
PADEP Review and Approval (120 Days)December 20, 2014

New Sewer Connections

We reviewed a design plan and report submission for a new private wastewater pump station for Acero Precision at 1430 Enterprise Dr, discussed comments and questions with the PW Director and forwarded comments to the design consultant. This will go through West Goshen. Also, we received a plan from Sunny Ridge Farm for the Colonial Lane subdivision.

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 5-12-14 draft.doc

2

Fairway Village Manhole Lining

We coordinated scheduling of the SprayWall monolithic polyurethane interior manhole lining system with the contractor including attending a pre-construction field meeting. They tentatively plan to perform the work the week of June 10, 2014.

RCSTP Tank Covers

We continued the evaluation of flexible tank cover alternatives and forwarded a draft updated summary memo to the Township. We are still awaiting feedback and pricing from a couple of vendors before finalizing the memo. The memo will be finalized by the June Municipal Authority meeting.

3. Big Fish Environmental Services

– The following is a summary of Scott's report for April 2014:

Treatment Process Operation- During February 2014, there were no exceedances of the final effluent discharge limitations for Outfall 001 and Outfall 002.

The monthly average total phosphorus concentration was 0.38 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.24 mg/L to 0.63 mg/L with an average of 44.4 gallons per day of aluminum sulfate solution.

There was no discharge to Applebrook, Outfall 002, during March 2014.

During the month of April 2014, the total phosphorus concentrations at the final effluent outfall 001 were slightly elevated at or above the permitted discharge limitation of 0.5 mg/L. Aluminum sulfate feed rates were increased as the month progressed to assist with total phosphorus removal. During April, especially during 3 of the 4 scheduled sampling events, the influent wastewater flow to the SBRs ranged from 12% to 43% above the March monthly average. Periodically, the influent flow rate and volume to the SBRs resulted in "Filled Decants." The Filled Decant condition results in diverting a mixture of influent wastewater and treated effluent directly to the post flow equalization basins, disc filters and disinfection prior to discharge through outfall 001. The preliminary data indicates that the final effluent total phosphorus concentration is likely to slightly exceed the permitted concentration of 0.50 mg/L. The mass loading permit limitation is anticipated to remain below the monthly average of 3.0 lbs per day.

Improvement management for total phosphorus during periods of elevated flow rates to the SBRs resulting in Filled Decant conditions, include the following actions:

  • Utilize the polymer feed system which provided polymer prior to filtration to assist with coagulation/flocculation of solids and total phosphorus. Coordination with Aqua Aerobics for a compatible product for the filter media is strongly recommended.
  • Provide for the capability of addition of aluminum sulfate to the influent wastewater during a Filled Decant condition.
  • Evaluate utilizing poly aluminum chloride (PAC) solution prior to filtration in place of aluminum sulfate solution. High dosages of aluminum sulfate solution contribute to elevated TSS concentrations and turbidity whereas PAC has negligible impacts.
  • Re-evaluate the use of real time control loop system for integrating aluminum sulfate feed rates with disc filter and/or SBR influent flow rates.

During March 2014, there was no discharge to Applebrook. The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 5-12-14 draft.doc

3

concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

SBRs 1,3 and 4 were in service during the month of April.

Process monitoring of each SBR included ammonia as N, Nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remain reduced during the month of April. Increased sludge wasting was continued to maintain lower the MLSS concentrations. SBRs 3 & 4 were observed to have a maximum of approximately 5% of the surface area covered with a medium brown colored foam. Adjustments to the treatment process to lower the MLSS concentrations and raise the F:M ratio within the target range of 0.045 to 0.06 were ongoing during the month.

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was increased from 45 gpd to as high as 90 gpd during April to assist with total phosphorus removal. Increased aluminum sulfate dosages prior to filtration were increased during the month. Soda ash addition to the SBRs to assist with maintaining the desired pH concentrations above 7.0 standard units continued during the month. Soda ash addition to the SBRs during April averaged 308 pounds per day.

SBR #2 remains out of service as a treatment unit, however, partially filled with MLSS which is continuously mixed and aerated. The majority of the contents were transferred to the sludge holding tanks. This SBR was periodically placed in service to assist with managing peak flows to reduce the impact of Filled Decant conditions.

The decanter for SBR 3 continued to be periodically observed as being slightly tilted within the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The frequency of occurrence ranged from one to several occurrences during the month. The SBR is planned for removal from service during May for inspection.

Solids Dewatering and Disposal: April 2014

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank #1 was in service. The level at the beginning of the month was 13.55 feet and the level at the end of the month was 7.11 feet. The initial total solids concentration was 1.21% and ended the month as 0.625% total solids. The average pH concentration was 6.98 S.U. and total alkalinity of 325 mg/L. No supernatant was decanted during the month. A total of 650 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank #2 was in service. The level at the beginning of the month was 5.81 feet and the level at the end of the month was 13.78 feet. The initial total solids concentration was 0.69% and ended the month as 0.85% total solids. The average pH concentration was 7.05 S.U. and total alkalinity of 319 mg/L. 207,013 gallons of supernatant were decanted during the month. A total of 400 pounds of soda ash were added during the month for pH adjustment.

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 5-12-14 draft.doc

4

Significant storm/hydraulic Loading Events

– On April 15, 2014 the influent flows rate to the SBRs continuously exceeded 100% of the hydraulic design rate from 9:43 through 22:11 (approx. 13 hours). A total 7 Filled Decant and 1 Filled settle condition were observed for a total of 302 minutes (5.03 hours). The effluent clarity remained good with no bulking or excessive solids present within the discharge at outfall 001.

On April 30, 2014 through May 1, 2014, the influent flows rate to the SBRs continuously exceeded 233% of the hydraulic design rate from 13030 through 2:24 (approx.. 12 hours). A total of 11 Filled Decant and Filled settle conditions were observed for a total of 805 minutes (13.4 hours). The effluent clarity remained good with no bulking or excessive solids present within the discharge at outfall 001.

Minor Repairs and Preventive Maintenance

1. Replaced a ballast in UV bank #2

There were 7" of rain in the month of April.

Scott will write a letter for the compliance issue.

Approval of Minutes

Ed moved to accept the minutes of April 21, 2014 as corrected. Fran seconded the motion. The motion passed unanimously.

Approval of Invoices

1. Fran moved to approve payment of the following Pennoni invoices:

ItemInvoiceAmount
a.Pennoni #587993$ 197.25
b.Pennoni #587994$ 4,724.50
c.Pennoni #587995$ 992.00
d.Pennoni #587996$ 4,562.25
e.Pennoni #587997$ 644.25

Ed seconded the motion. The motion passed unanimously.

Liaison Reports

Board of Supervisors – Carmen reported that they are continuing to check on the Sunoco gas line project. Right now they have a certificate of Public Convenience. Phase 1 is to reactivate the current 8" line.

Financial Reports

1. Jon Altshul's May 5, 2014 Financial Report for April 2014:

The Municipal Authority recorded $133 in revenues and $15,677 in expenses in April, a difference of -$15,545. The expenses were from payments to Pennoni and Gawthrop Greenwood. The fund balance is now $1,598,005.

Old Business

1. Tank Covers - The Municipal Authority requested this feasibility report in order to be proactive and find out what alternatives are available if needed in the future. Mike presented his findings so far and provided pictures of the different types of covers.

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 5-12-14 draft.doc

5

Goals

1. Rick provided a draft mission statement. Review will be deferred to the June meeting.

2. Kevin will submit an article for the next newsletter which is due 7/1/14.

3. Act 537 Plan – Revisions submitted to EGMA, EGPC, WGSTP, WGPC and CCPC.

4. Continue to implement I&I Plan – April 14 status report received.

New Business

1. Kevin moved to authorize the Municipal Authority Chairman, Jack Yahres to sign the Reservoir Road Act 537 Revision. Ed seconded the motion. Mike explained how calculations were made. The motion passed unanimously.

Any Other Matter

1. Reserve Pump Station Sanitary Sewer Diversion – In the May 9, 2014 memo – Mike Ellis recommended that the MA conditionally approve Payment #3 (Final) to Ronald Smith Inc. for the subject project in the amount of $7,316.82. The recommended condition is that payment not be physically made until the contractor addresses the following items to the satisfaction of the Authority Engineer, Township Manager and Township PW Director:

  • a. Remove the filter sock along the creek
  • b. Restore the constructed lawn area at the former location of the pump station building and driveway. Grass is not growing in well and the soil is rocky. Additional topsoil and seed is expected to be needed.
  • c. Submit a corrected Application and Certification form for Payment #3(Final). We've marked up the submitted application with required revisions and have attached it for your reference.
  • d. As-built plans have been submitted by the contractor directly to the Township. Pennoni needs to review the plans to confirm they are acceptable. Mike intends to perform the review prior to the May 12 th MA meeting.

We have reviewed the following attached contract closeout documents and found them acceptable: Daily Field Report from Earth Engineering Inc. certifying the backfill compaction within the detention basin berm; contractor's release; consent of surety to final payment; contract bond (including the maintenance bond); and payroll certification #1-7 for Ronald Smith Inc. Ed made a motion to approve the payment of $7,316.82 subject to referenced conditions and approval by the Township Manager. Fran seconded the motion. The motion passed unanimously.

Adjournment

There being no further business, Fran moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 5-12-14 draft.doc

6

INVOICE

Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :591749
Invoice Date :05/21/2014
Project :EGMA1306
Project Name :Reserve PS Diversion Construction

For Services Rendered through: 5/11/2014

Continued coordination with contractor to obtain required contract closeout documents, reviewed Pay App #3 (Final) and provided mark-ups to contractor, prepared and issued memo recommending conditional approval of Pay App #3, and coordinated w/ contractor and Township for contractor to remove filter sock and to address restoration issues at location of former pump station building and driveway including field visit by Sr. Engineering Tech to evaluate scope of needed restoration.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor :619.75
Expense :0.00
Phase Total :619.75

Amount Due This Invoice: $619.75

Fee :20,000.00
Prior Billings :14,437.75
Current Billings :619.75
Total Billings :15,057.50

Phase : **** – Professional Services

Labor ClassHours/UnitsRateAmount
Authority Engineer4.75113.00536.75
Associate Engineer1.0083.0083.00
Labor Total:5.75619.75
Total Phase : **** – Professional Services — Labor :$619.75
Total Phase : **** – Professional Services — Expense :$0.00
Total Project : EGMA1306 – Reserve PS Diversion Construction — Labor :$619.75
Total Project : EGMA1306 – Reserve PS Diversion Construction — Expense :$0.00

Handwritten note in red ink: "ok RS 6-7-14"

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1306 Invoice Summary
Invoice Date 05/21/2014

Project:EGMA1306
Pennoni Job No.:Reserve PS Diversion Construction P
Invoice No:591749
Invoice Period:4/14/2014to5/11/2014
Initial Authorization:$ 20,000.00Date:5/21/2014
Contract Amount:$ 20,000.00
Previously Invoiced:$ 14,437.75
Current Invoice:$ 619.75
Invoiced to Date ($):$ 15,057.50
Invoiced to Date (%):75%
Remaining Budget ($):$ 4,942.50
Remaining Budget (%):25%

Budget by Phase:

Phase Name:Reserve PS Diversion Construction Phase
Phase Budget:$ 20,000.00
Previously Invoiced:$ 14,437.75
Current Invoice:$ 619.75
Invoiced to Date ($):$ 15,057.50
Invoiced to Date (%):75%
Remaining Budget ($):$ 4,942.50
Remaining Budget (%):25%

Comments: Continued coordination with contractor to obtain required contract closeout documents, reviewed Pay App #3 (Final) and provided mark-ups to contractor, prepared and issued memo recommending conditional approval of Pay App #3, and coordinated w/ contractor and Township for contractor to remove filter sock and to address restoration issues at location of former pump station building and driveway including field visit by Sr. Engineering Tech to evaluate scope of needed restoration.

INVOICE

Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :591750
Invoice Date :05/21/2014
Project :EGMA1307
Project Name :Reservoir Rd PS Act 537 Planning

For Services Rendered through: 5/11/2014

Finalized Act 537 Plan Update report and plot plans; submitted Act 537 Plan Update to East Goshen Township Planning Commission, West Goshen Township Planning Commission, West Goshen Sewage Treatment Plant Operator, Chester County Planning Commission, and Chester County Health Department; reviewed Conestoga-Rovers & Associates' (CRA) Phase 1 Bog Turtle Habitat Survey Report and coordinated submission to U.S. Fish & Wildlife Service; and prepared and submitted a revised PNDI Search and additional documentation to DCNR to justify our request to eliminate their botanical survey requirement.

PhaseLaborExpensePhase Total
Phase : 02 -- Existing Conditions Survey1,107.500.001,107.50
Phase : 03 -- Act 537 Plan Update3,828.750.003,828.75
Phase : 04 -- Additonal Meetings825.000.00825.00

Amount Due This Invoice: $5,761.25

Handwritten note in red ink: "ok RS 6-7-14"

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning

Invoice # : 591750

...Continued from previous page

Phase : 02 -- Existing Conditions Survey

Labor ClassHours/UnitsRateAmount
Authority Engineer6.75110.00742.50
Graduate Engineer5.0073.00365.00
Labor Total:11.751,107.50

Total Phase : 02 -- Existing Conditions Survey. Labor: $1,107.50. Expense: $0.00.

Phase : 03 -- Act 537 Plan Update

Labor ClassHours/UnitsRateAmount
Authority Engineer20.00110.002,200.00
Senior Environmental Scientist2.5085.00212.50
Graduate Engineer12.2573.00894.25
Engineering Technician II7.2572.00522.00
Labor Total:42.003,828.75

Total Phase : 03 -- Act 537 Plan Update. Labor: $3,828.75. Expense: $0.00.

Phase : 04 -- Additonal Meetings

Labor ClassHours/UnitsRateAmount
Authority Engineer7.50110.00825.00
Labor Total:7.50825.00

Total Phase : 04 -- Additonal Meetings. Labor: $825.00. Expense: $0.00.

Total Project : EGMA1307 – Reservoir Rd PS Act 537 Planning. Labor: $5,761.25. Expense: $0.00.

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. — Page: 2

East Goshen Municipal Authority
EGMA1307 Invoice Summary
Invoice Date 05/21/2014

Project:EGMA1307
Pennoni Job No.:Reservoir Rd PS Act 537 Planning
Invoice No:591750
Invoice Period:4/14/2014to5/11/2014
Initial Authorization:$ 77,400.00Date:5/21/2014
Contract Amount:$ 84,900.00
Previously Invoiced:$ 64,094.25
Current Invoice:$ 5,761.25
Invoiced to Date ($):$ 69,855.50
Invoiced to Date (%):82%
Remaining Budget ($):$ 15,044.50
Remaining Budget (%):18%

Budget by Phase:

Phase Name:Reservoir Rd PS Act 537 Planning
Phase Budget:$ 84,900.00
Previously Invoiced:$ 64,094.25
Current Invoice:$ 5,761.25
Invoiced to Date ($):$ 69,855.50
Invoiced to Date (%):82%
Remaining Budget ($):$ 15,044.50
Remaining Budget (%):18%

Comments: Finalized Act 537 Plan Update report and plot plans; submitted Act 537 Plan Update to East Goshen Township Planning Commission, West Goshen Township Planning Commission, West Goshen Sewage Treatment Plant Operator, Chester County Planning Commission, and Chester County Health Department; reviewed Conestoga-Rovers & Associates' (CRA) Phase 1 Bog Turtle Habitat Survey Report and coordinated submission to U.S. Fish & Wildlife Service; and prepared and submitted a revised PNDI Search and additional documentation to DCNR to justify our request to eliminate their botanical survey requirement.

INVOICE

Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :591751
Invoice Date :05/21/2014
Project :EGMA1401
Project Name :2014 General Services

For Services Rendered through: 5/11/2014

Prepared April and May Engineer's Reports; attended April Municipal Authority (MA) meeting; continued coordination with Abel Recon to obtain discounted pricing for SprayWall manhole lining demonstration for Fairway Village manhole, prepared memo to MA summarizing cost and scope for consideration/approval, coordinated schedule with contractor following MA approval; continued RCSTP tank cover research, coordinated with vendors, and updated and issued DRAFT tank cover alternatives memo Update #1.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor :1,766.75
Expense :0.00
Phase Total :1,766.75

Amount Due This Invoice: $1,766.75

Fee :10,300.00
Prior Billings :3,813.25
Current Billings :1,766.75
Total Billings :5,580.00

Phase : **** -- Professional Services

Labor ClassHours/UnitsRateAmount
Authority Engineer10.75113.001,214.75
Project Engineer4.5095.00427.50
Senior Engineering Technician1.5083.00124.50
Labor Total:16.751,766.75
Total Phase : **** -- Professional Services — Labor :$1,766.75
Total Phase : **** -- Professional Services — Expense :$0.00
Total Project : EGMA1401 – 2014 General Services — Labor :$1,766.75
Total Project : EGMA1401 – 2014 General Services — Expense :$0.00

Handwritten note in red ink: "ok RS 6-7-14"

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 05/21/2014

Project:EGMA1401
Pennoni Job No.:2014 General Services
Invoice No:591751
Invoice Period:4/14/2014to5/11/2014
Initial Authorization:$ 10,300.00Date:5/21/2014
Contract Amount:$ 10,300.00
Previously Invoiced:$ 3,813.25
Current Invoice:$ 1,766.75
Invoiced to Date ($):$ 5,580.00
Invoiced to Date (%):54%
Remaining Budget ($):$ 4,720.00
Remaining Budget (%):46%

Budget by Phase:

Phase Name:2014 General Services
Phase Budget:$ 10,300.00
Previously Invoiced:$ 3,813.25
Current Invoice:$ 1,766.75
Invoiced to Date ($):$ 5,580.00
Invoiced to Date (%):54%
Remaining Budget ($):$ 4,720.00
Remaining Budget (%):46%

Comments: Prepared April and May Engineer's Reports; attended April Municipal Authority (MA) meeting; continued coordination with Abel Recon to obtain discounted pricing for SprayWall manhole lining demonstration for Fairway Village manhole, prepared memo to MA summarizing cost and scope for consideration/approval, coordinated schedule with contractor following MA approval; continued RCSTP tank cover research, coordinated with vendors, and updated and issued DRAFT tank cover alternatives memo Update #1..

INVOICE

Pennoni Associates Inc., Consulting Engineers (logo). Newark, DE. 302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :591752
Invoice Date :05/21/2014
Project :EGMA1402
Project Name :2014 Semi-Annual I&I Reports

For Services Rendered through: 5/11/2014

Finalized and submitted Semi-Annual I/I Report #11 including updating Pennoni's Township-wide sewer mapping with the Township's new GPS-located manhole locations.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor :1,238.00
Expense :0.00
Phase Total :1,238.00

Amount Due This Invoice: $1,238.00

Fee :10,300.00
Prior Billings :4,562.25
Current Billings :1,238.00
Total Billings :5,800.25

Phase : **** -- Professional Services

Labor ClassHours/UnitsRateAmount
Authority Engineer1.00113.00113.00
Graduate Engineer15.0075.001,125.00
Labor Total:16.001,238.00
Total Phase : **** -- Professional Services — Labor :$1,238.00
Total Phase : **** -- Professional Services — Expense :$0.00
Total Project : EGMA1402 – 2014 Semi-Annual I&I Reports — Labor :$1,238.00
Total Project : EGMA1402 – 2014 Semi-Annual I&I Reports — Expense :$0.00

Handwritten note in red ink: "ok RS 6-7-14"

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 05/21/2014

Project:EGMA1402
Pennoni Job No.:2014 Semi-Annual I&I Reports
Invoice No:591752
Invoice Period:4/14/2014to5/11/2014
Initial Authorization:$ 10,300.00Date:5/21/2014
Contract Amount:$ 10,300.00
Previously Invoiced:$ 4,562.25
Current Invoice:$ 1,238.00
Invoiced to Date ($):$ 5,800.25
Invoiced to Date (%):56%
Remaining Budget ($):$ 4,499.75
Remaining Budget (%):44%

Budget by Phase:

Phase Name:2014 Semi-Annual I&I Reports
Phase Budget:$ 10,300.00
Previously Invoiced:$ 4,562.25
Current Invoice:$ 1,238.00
Invoiced to Date ($):$ 5,800.25
Invoiced to Date (%):56%
Remaining Budget ($):$ 4,499.75
Remaining Budget (%):44%

Comments: Finalized and submitted Semi-Annual I/I Report #11 including updating Pennoni's Township-wide sewer mapping with the Township's new GPS-located manhole locations.

Gawthrop Greenwood, PC

Attorneys at Law (logo with "GG" monogram)

17 East Gay Street, Suite 100, West Chester, PA 19381-0562
(p) 610-696-8225 (f) 610-344-0922
gglaw@gawthrop.com www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page:1
Date:04/30/2014
Client No:6604-001M
Invoice No.119419

General Authority Services

Fees

DateTimekeeperDescriptionHoursTotal
04/03/2014RFADraft sewer connection agreement form for use by Authority.1.30
04/04/2014RFAReview and revise proposed sewer connection agreement.0.70
04/07/2014RFAMessage to R Smith sending proposed sewer connection agreement.0.30
04/08/2014RFAReview message from R Smith suggesting changes to sewer connection agreement; draft revisions to same.1.00
04/09/2014RFAReview and revise sewer connection agreement suggested by R Smith; Message to R Smith regarding revised sewer connection agreement.0.60
04/21/2014RFAReview packet for Authority meeting of 4/21; attend regular meeting of Authority.2.60
For Current Services Rendered6.501,300.00

Recapitulation

TimekeeperHoursHourly RateTotal
Robert F. Adams6.50$200.00$1,300.00
Previous Balance$960.00 (struck through in red ink)
Total Current Charges1,300.00 (circled in red ink)

Handwritten note in red ink: "ok RS 6-7-14"

Page:2
Date:04/30/2014
Client No:6604-001M
Invoice No.119419

East Goshen Municipal Authority

General Authority Services

DateDescriptionAmount
04/22/2014Fee Payment-960.00
Balance Due$1,300.00

To ensure proper credit, please write client number on your check when returning payment. Thank You. A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA May Financial Reports
Date: June 5, 2014

The Municipal Authority recorded $6,847 in revenues (primarily from tapping fees) and $15,570 in expenses in May, a difference of -$8,723. The fund balance is now $1,589,282.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
May 2014

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 1,598,004.89
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 2,000.00 134.59 663.00
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 2,000.00 134.59 663.00
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00
TOTAL EXPENSES 0.00 0.00 0.00
RCSTP NET RESULT 2,000.00 134.59 663.00

U:\bmccool\2014\Municipal Authority\2014 - 05 - Municipal Authority Report.xlsx      Page 1 of 3      06/04/14

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
May 2014

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS 07341 1000 27.00 0.90 5.73
C.C. TAPPING FEES 07364 1100 124,000.00 2,000.00 22,000.00
R.C.TAPPING FEES 07364 1110 21,444.00 4,288.80 10,288.80
CONNECTION FEES - SEWER 07364 1130 0.00 281.88 1,127.52
MISCELLANEOUS REVENUE 07380 1000 0.00 141.12 564.48
TRANSFER FROM SEWER OPERATING 07392 0500 0.00 0.00 21,000.00
TOTAL REVENUE 145,471.00 6,712.70 54,986.53
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 32,768.00 0.00 8,043.02
MISCELLANEOUS EXPENSE 07424 3000 4,000.00 0.00 1,450.00
MUNIC.AUTH.-AUDITING 07424 3110 10,800.00 0.00 0.00
ENGINEERING SERVICES 07424 3130 35,525.00 6,198.50 22,285.50
LEGAL SERVICES 07424 3140 7,000.00 1,300.00 3,760.00
M.C.-DVRFA-DEBT SERVICE 07471 1000 22,120.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 5,115.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 0.00 0.00 0.00
TOTAL EXPENSES 117,328.00 7,498.50 35,538.52
OPERATING NET RESULT 28,143.00 (785.80) 19,448.01

U:\bmccool\2014\Municipal Authority\2014 - 05 - Municipal Authority Report.xlsx      Page 2 of 3      06/04/14

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
May 2014

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07393 1001 0.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 0.00 0.00 0.00
TOTAL REVENUE 0.00 0.00 0.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 0.00 0.00 0.00
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 0.00 0.00 0.00
MANHOLE COVER REPLACEMENTS 07424 7405 0.00 0.00 0.00
C.C. CAPITAL - COLLECTION 07424 7420 0.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 0.00
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 0.00 0.00 0.00
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 0.00
HERSHEY MILL STATION - ENGINEER 07426 1000 0.00 0.00 0.00
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 0.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 0.00 197.25 197.25
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 0.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 75,000.00 7,874.50 28,902.25
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
TOTAL EXPENSES 75,000.00 8,071.75 29,099.50
CAPITAL NET RESULT (75,000.00) (8,071.75) (29,099.50)
MUNICIPAL AUTHORITY ENDING FUND BALANCE 1,589,281.93

U:\bmccool\2014\Municipal Authority\2014 - 05 - Municipal Authority Report.xlsx      Page 3 of 3      06/04/14

East Goshen Township General Ledger

Report Date 06/04/14 GL Transaction Details PAGE 1

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1401 JE 41027 0.58 02/04/14 INTEREST INTEREST EARNED JANUARY 2014
07 FUND
0.00 0.58 -0.58
1402 41391 1.33 03/04/14 INTEREST INTEREST EARNED FEBRUARY 2014
07100.1000
0.00 1.33 -1.91
1403 41840 1.71 04/01/14 INTEREST INTEREST EARNED MARCH 2014
07 FUND
0.00 1.71 -3.62
1404 42321 1.21 05/02/14 INTEREST INTEREST EARNED APRIL 2014
07100.1000
0.00 1.21 -4.83
1405 42739 0.90 06/02/14 INTEREST INTEREST EARNED MAY 2014
07100.1000
0.00 0.90 -5.73
0.00 5.73 -5.73
07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00
1401 41028 137.33 02/04/14 INTEREST INTEREST EARNED JANUARY 2014
07 CONSTRUCTION FUND
0.00 137.33 -137.33
1402 41392 123.56 03/04/14 INTEREST INTEREST EARNED FEBRUARY 2014
07 CONSTRUCTION FUND
0.00 123.56 -260.89
1403 41841 136.07 04/01/14 INTEREST INTEREST EARNED MARCH 2014
07 CONSTRUCTION FUND
0.00 136.07 -396.96
1404 42322 131.45 05/02/14 INTEREST INTEREST EARNED APRIL 2014
CONSTRUCT.FUNDS
0.00 131.45 -528.41
1405 42740 134.59 06/02/14 INTEREST INTEREST EARNED MAY 2014
07 FUND - CONSTRUCTION
0.00 134.59 -663.00
0.00 663.00 -663.00
07364-1100 C.C. TAPPING FEES 0.00
1401 CR 40976 12,600.00 01/31/14 3034 8069 1 GOSHEN MEADOWS INVESTORS L.P.

East Goshen Township General Ledger

Report Date 06/04/14 GL Transaction Details PAGE 2

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
0.00 12,600.00 -12,600.00
1402 41258 5,400.00 02/24/14 3553 8069 1 GOSHEN MEADOWS INVESTORS L.P.
RE 41263 2,000.00 02/24/14 41263 1 TAP IN FEE - 211 ELLIS LANE
0.00 7,400.00 -20,000.00
1405 42661 2,000.00 05/29/14 42661 1 TAP IN FEE FOR 195 WYLLPEN PL
0.00 2,000.00 -22,000.00
0.00 22,000.00 -22,000.00
07364-1110 R.C.TAPPING FEES 0.00
1402 41280 2,000.00 02/25/14 41280 1 TAP IN FEE-903 SORELL HILL LT2
0.00 2,000.00 -2,000.00
1403 41553 2,000.00 03/13/14 41553 1 TAP IN FEE FOR 909 SORRELL LT4
41608 2,000.00 03/17/14 41608 1 TAP IN FEE-905 SORRELL LOT 3
0.00 4,000.00 -6,000.00
1405 CR 42355 4,288.80 05/06/14 130 6499 1 BOWER, JUDITH
0.00 4,288.80 -10,288.80
0.00 10,288.80 -10,288.80
07364-1130 CONNECTION FEES - SEWER 0.00
1402 41044 423.00 02/04/14 350 8035 1 JACOBS, ROBERT & CHERYL
41124 423.00 02/14/14 774 8033 1 GEORGE SMITH & CHRISTINA CONLE
JE 41045 141.12 02/04/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
41125 141.12 02/14/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
282.24 846.00 -563.76
1403 CR 41402 423.00 03/04/14 2307 8034 1 STOFFLET, MICHAEL
JE 41407 141.12 03/04/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
141.12 423.00 -845.64
1405 CR 42378 423.00 05/07/14 1021 8036 1 PAPPANO, JOSEPH & PATRICIA
JE 42380 141.12 05/07/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
141.12 423.00 -1,127.52
564.48 1,692.00 -1,127.52
07380-1000 MISCELLANEOUS REVENUE 0.00
1402 41045 141.12 02/04/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
41125 141.12 02/14/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 282.24 -282.24
1403 41407 141.12 03/04/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT

East Goshen Township General Ledger

Report Date 06/04/14 GL Transaction Details PAGE 3

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
0.00 141.12 -423.36
1405 42380 141.12 05/07/14 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 141.12 -564.48
0.00 564.48 -564.48
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1401 40674 1,000.00 01/08/14 DEPOSIT DEPOSIT $ INTO MA GENERAL
FROM 05 FUND
40747 20,000.00 01/14/14 XFER XFER $ FROM SEWER TO MA TO
COVER EXPENSES
0.00 21,000.00 -21,000.00
0.00 21,000.00 -21,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1403 CD 41815 8,043.02 03/31/14 2237 425 EAST GOSHEN TOWNSHIP - GENERAL
1ST QTR.2014 MUN.AUTH. REIMBURSM
8,043.02 0.00 8,043.02
8,043.02 0.00 8,043.02
07424-3000 MISCELLANEOUS EXPENSE 0.00
1401 40597 500.00 01/06/14 2228 2737 DEP - COMMONWEALTH OF PA
NPDES PERMITS - CHAPTER 92A 2014
950.00 01/06/14 2229 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2014 ACTIVE MEMBERSHIP DUES
1,450.00 0.00
1,450.00 0.00 1,450.00
1,450.00 0.00 1,450.00
07424-3130 ENGINEERING SERVICES 0.00
40653 -663.75 01/06/14 2224 1052 PENNONI ASSOCIATES INC.
VOID CK. DUE TO PRINTER PROBLEM
40743 663.75 01/14/14 2230 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/8/13 GENERAL S
JE 40746 1,845.00 01/14/14 REFUND PENNONI REFUND DUE TO
DUPLICATE PAYMENT
0.00 1,845.00 -1,845.00
1402 CD 41103 2,236.50 02/11/14 2233 1052 PENNONI ASSOCIATES INC.
SERVICES THROUGH 1/12/14 GEN.SER
2,236.50 0.00 391.50

East Goshen Township General Ledger

Report Date 06/04/14 GL Transaction Details PAGE 4

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1403 CD 41540 6,887.25 03/12/14 2236 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/9/14 2013 CHAP.
6,887.25 0.00 7,278.75
1404 42153 8,808.25 04/23/14 2239 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/16/14 CHAP.94 RE
8,808.25 0.00 16,087.00
1405 42462 6,198.50 05/14/14 2241 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/13/14 2013 CHAP.
6,198.50 0.00 22,285.50
24,130.50 1,845.00 22,285.50
07424-3140 LEGAL SERVICES 0.00
1402 41310 800.00 02/27/14 2234 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES - NOV.2013 GEN.AU
800.00 0.00 800.00
1403 41540 700.00 03/12/14 2235 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - FEB.2014 GEN.AUT
700.00 0.00 1,500.00
1404 42074 960.00 04/16/14 2238 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - MARCH 2014 GEN.A
960.00 0.00 2,460.00
1405 42462 1,300.00 05/14/14 2240 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE APRIL 2014 GEN.AUT
1,300.00 0.00 3,760.00
3,760.00 0.00 3,760.00
07424-7460 LOCHWOOD - CAPITAL -STP 0.00
1401 40739 1,290.00 01/14/14 10012 2695 BRICKHOUSE ENVIRONMENTAL
LOCHWOOD CHASE PROJECT - DEC.201
40744 -1,290.00 01/14/14 10012 2695 BRICKHOUSE ENVIRONMENTAL
VOID CK. - INCORRECT CASH ACCT.U
40745 1,290.00 01/14/14 2231 2695 BRICKHOUSE ENVIRONMENTAL
LOCHWOOD CHASE PROJECT - DEC. 20
JE 40820 1,290.00 01/22/14 DEPOSIT DEPOSIT TO REIMBURSE 07 MA
FOR 05 EXPENSE
1,290.00 1,290.00 0.00
1,290.00 1,290.00 0.00
07427-1000 RESERVE PUMP STATION - ENGINEER 0.00

East Goshen Township General Ledger

Report Date 06/04/14 GL Transaction Details PAGE 5

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1405 CD 42462 197.25 05/14/14 2241 1052 PENNONI ASSOCIATES INC.
SERV.THRU 4/123/14 RESERVE PS
197.25 0.00 197.25
197.25 0.00 197.25
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1402 41107 10,687.50 02/11/14 10013 1052 PENNONI ASSOCIATES INC.
SERV.THROUGH 1/12/14 RESERVE PS
10,687.50 0.00 10,687.50
1403 41541 4,431.25 03/12/14 10014 1052 PENNONI ASSOCIATES INC.
SERV.THRU 2/9/14 RESERV.RD. PS
4,431.25 0.00 15,118.75
1404 42154 5,909.00 04/23/14 10015 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/16/14 RESERV.RD
5,909.00 0.00 21,027.75
1405 42463 4,724.50 05/14/14 10016 1052 PENNONI ASSOCIATES INC.
SERV. THRU 4/13/14 RESERVOIR RD.
42514 3,150.00 05/16/14 10017 3312 CONESTOGA & ASSOCIATES
PROF.SERVICE THRU 3/30/14 RESERV
RD. PS - BOG TURTLE HABITAT
7,874.50 0.00 28,902.25
28,902.25 0.00 28,902.25
Beg Bal 0.00 68,337.50 59,349.01 8988.49000001

8. GOALS

  1. Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014 May 8 – The MA does not have a current mission statement. A first draft is included in the packet. June 9 – Changed “lease” to “leasee”
  2. Submit an article for each newsletter – Due date for newsletter Need by 1/31/14 – Dana Completed Need by 4/30/14 – Jack Completed Need by 7/1/14 - Kevin Need by 10/31/14
  3. Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014 May 8 - Revisions submitted to EGMA, EGPC, WGSTP, WGPC, CCHD, and CCPC
  4. Develop a recommendation on covers for the SBRs – August 1, 2014 May 8 – Draft memo distributed. June 9 – Final memo in packet
  5. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack- Completed 2 nd Quarter (June) – Ed- Completed 3 rd Quarter (September) 4 th Quarter (December)
  6. Respond to capacity requests in 45 days or less. 211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house
  7. Continue to implement I & I Plan April 14 – Status Report received
  8. Operate RCSTP in compliance with NPDES Permit January, February, March, May

F:\Data\Shared Data\Agendas\Municipal Authority\2014\6-9-14.doc

[Handwritten in top right margin: 8a]

MUNICIPAL AUTHORITY MISSION STATEMENT:

DRAFT 5/8/14
DRAFT 6/9/14

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

F:\Data\Shared Data\ABC'S\Municipal Authority\By-Laws & Mission\Mission Statement Draft 060914.doc
F:\Data\Shared Data\ABC'S\Municipal Authority\By-Laws & Mission\Mission Statement Draft 050814.doc

[Handwritten in top right margin: 8 d]

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

MEMORANDUM

TO: Rick Smith
      Mark Miller
      East Goshen Municipal Authority

FROM: Michael J. Ellis, P.E.

DATE: June 5, 2014

SUBJECT: ODOR CONTROL ALTERNATIVES – COVERS AND MISTERS
                  UPDATE #1
                  RIDLEY CREEK SEWAGE TREATMENT PLANT

An evaluation of odor control alternatives and tank covers was briefly discussed at the January 13th Municipal Authority meeting. It is our understanding that there have been no odor complaints and that odor control is not currently needed, but the Authority is interested in proactively evaluating the feasibility and cost of odor control alternatives for planning purposes. Further, there should not be any odor issues in a properly designed and well-operated wastewater treatment plant.

We researched multiple alternatives and prepared a rough cost analysis for a few common odor control solutions.

The two most common methods of odor control are tank covers and chemical misters.

1. Covers – There are several different types of covers:

  • Solid, fixed cover Fiberglass reinforced plastic (FRP) covers were included as an alternative bid item in the RCSTP Upgrade and Expansion in 2008. Covers were included for the SBR tanks, post equalization tanks, and sludge digestion tanks. The bids ranged from $750,000 to $810,000 for the covers.; The expected cost for a new bid project would likely be over $1,000,000 due to price increases and bidding expenses, since it would be a stand-alone project (no cost savings as would be expected by including it in the overall plant expansion contract).; Additional considerations that would need to be evaluated during the design of tank covers that could add cost include: New structural support members on the walkways Addition of carbon columns and fans to the interior to control a resultant musty odor.; New structural support members on the walkways; Addition of carbon columns and fans to the interior to control a resultant musty odor.
  • Flexible cover, such as fabric, geo-membrane, or tarps – The cover would need to be able to handle/shed a rain and snow load so some additional supports may be needed. Carbon columns and fans may also be needed. Flexible covers generally are inflatable or arch/frame

EGMA1401      June 5, 2014      Page 2 of 3
East Goshen Municipal Authority      RCSTP Odor Control Alternatives

supported. Flexible covers are expected to be a similar cost as solid, fixed covers. Specific alternatives include but are not limited to:

  • SBR tank covers by Geomembrane Technologies Inc. (GTI). GTI's structurally supported cover system consists of a retractable fabric cover tensioned over a series of low profile aluminum arches. The covers are typically used at wastewater treatment plants to capture odorous off gas for removal and treatment. Water treatment plants use the covers for blocking sunlight to control algae growth and chlorine usage/disinfection byproduct formation. The cover fabric is strong and durable, and can be quickly disconnected and easily retracted to access tank internals for maintenance or inspection. Rainwater can drain off the cover. Estimated costs for acquisition and installation would be about $340,000 to cover the SBR tanks only. Installation would take approximately 270 man-hours at a cost of $40,000. GTI’s cover system cannot be used on the circular post equalization and sludge digestion tanks due the arch design. A separate cover would therefore need to be used on those tanks if the GTI cover was used on the SBR tanks.
  • WesTech, Inc. offers the Duosphere™ Membrane Gasholder Digester Cover. This dual membrane system uses fans to pressurize the air space between the membranes providing consistent positive pressure to the gas contained within the inner membrane. The inner membrane inflates and deflates depending on the amount of gas storage required. The outer membrane is a high strength PVC coated polyester fabric. The cover does not require a separate structural support system. The system can be used on the SBR tanks and the circular tanks. The total estimated cost for acquisition and installation is $1,300,000 ($252,000 for each circular tank (2 total) and $771,800 for the SBR tanks). This option is more costly but it is a more extensive system that provides management of gaseous odors, not just coverage of the tanks.
  • Environetics, Inc. offers the custom manufactured Defender Tank Cover. The cover is composed of heavy duty reinforced geomembrane materials combined with clear span structural aluminum frames, and stainless steel hardware that provide a durable, maintenance free service life. Its opaque, light blocking, characteristics virtually eliminate UV light from the tanks for effective algae control. Access hatch and atmospheric vent options are available. It is our understanding that the covers can be provided on all tanks at the plant since they are custom-made. The supplier has not been responsive on pricing requests; however, we expect the cost would be comparable to that of the FRP and Duosphere™ covers.
  • Floating cover – Cover can be solid, flexible, or balls. Although floating covers are the least expensive alternative, they are not recommended because they can potentially cause a conflict with the decanter and backwash valves, may require additional baffles be added to prevent conflicts with existing equipment, and restrict visibility of the water surface. The Armor Ball cover could be acquired and installed in a quantity to cover all the tanks for approximately $30,000. The 4-inch diameter HDPE hollow reinforced balls float on the water surface covering approximately 91% of the surface area.

W:\PROJECTS\EGMA\EGMA1401-2014 General Services\RCSTP Tank Covers\Tank Covers MEMO Rev 6-5-14 FINAL.docx      LM03 10/2005

EGMA1401      June 5, 2014      Page 3 of 3
East Goshen Municipal Authority      RCSTP Odor Control Alternatives

  • Environetics, Inc. also offers a floating style cover comprised of buoyant modules filled with thermal insulation to cover the entire tank surface. The supplier has not been responsive on pricing requests.

2. Misters – There are two general types of misters: odor neutralizing (removes odor) and odor masking (masks odor like a scented air freshener).

  • Specific locations, typically around the site perimeter, would need to be determined.
  • The lower initial capital cost compared to covers is offset by the continuous chemical supply costs required for normal operation.
  • Misters may not be as effective at odor control as covers.

END OF MEMO

W:\PROJECTS\EGMA\EGMA1401-2014 General Services\RCSTP Tank Covers\Tank Covers MEMO Rev 6-5-14 FINAL.docx      LM03 10/2005

May. 15. 2014   9:03AM      No. 3012   P. 2

SEWER CONNECTION AGREEMENT

THIS AGREEMENT is made the ________ day of ________________________, 2014 by and between EAST GOSHEN MUNICIPAL AUTHORITY (“Authority”) and Glenn M White Land Co Inc. (“Owner”).

Background

A. The Owner holds legal title to the lot located at 195 Wyllpen Place, West Chester, PA, Willistown Township, being designated UPI # 54-8-13 (“Property”).

B. The Owner wishes to connect a sewer lateral from the structure on the Property to a lateral stub to be connected to the East Goshen Township public sewer system (“System”) to provide public sewer service to the Property.

C. The installation of the lateral stub and its connection to a sewer main or manhole of the System shall be made by Owner.

D. The parties have entered into this Agreement to set forth their responsibilities associated with the connection of the Property to the System.

NOW, THEREFORE, intending to be legally bound, the Authority and the Owner agree as follows:

1. The Owner's request for public sewer service shall be submitted to the Authority in writing on the East Goshen Township Public Sewer Connection Permit application form.

2. The Authority Engineer and/or Director of Public Works shall approve the location of the proposed connection and the method of connection before any installation activity is commenced.

3. The tapping and inspection fees associated with the connection to the System shall be paid by the Owner.

4. The Director of Public Works shall provide the Owner with a written estimate of the costs of the lateral stub installation and connection, which shall become Exhibit “A” to this Agreement.

5. If rock, poor soil conditions, water in excavation or other unforeseen site conditions are encountered by Authority during the installation of the lateral stub, the cost estimate provided shall be amended to reflect the additional charges for such conditions.

6. The Township Department of Public Works shall install the lateral stub and provide the Owner requesting public sewer service with an itemized invoice for labor, equipment

May. 15. 2014   9:03AM      No. 3012   P. 3

and materials. All land disturbance caused to the Property by reason of the lateral stub installation shall be restored by the Authority upon completion of the work.

7. The Authority shall have the right to lien the Property for any unpaid costs to the Authority that have been incurred in connection with the installation of the lateral stub.

8. Upon payment of the invoice for the installation of the lateral stub by the Authority, the connection of the lateral serving the Property to the lateral stub may be completed by the Owner.

IN WITNESS WHEREOF, Authority and Owner have executed this Sewer Connection Agreement the day and year first above written.

EAST GOSHEN MUNICIPAL AUTHORITY

By: ____________________________________

OWNER

[Signature: Glenn White Pres Glenn M White Land Co Inc.]

F:\Data\Shared Data\Willistown\Sewer\195 Wyllpen Place\agreement sewer connection.docx

May. 15. 2014   9:03AM      No. 3012   P. 4

EXHIBIT A

East Goshen Township
Cost Estimate
May 13, 2014

195 Wyllpen Place

Sanitary Sewer Pipe Work
Install 90' of 8" SDR pipe 8 ft. deep
Core manhole install 8 inch A-LOCK
Stone backfill compacted in 1 ft. lifts
3.5 tons 25 millimeter blacktop
2.0 tons 19 millimeter blacktop
Seal joints AC 20

Landscaping
Spade three pine trees and several small bushes during construction and reinstall. (Plus 1 year guarantee)
Remove several rocks
Replace excavated area with top soil
3 yards triple shredded mulch
Seed and Straw grass areas

Total Cost $12,203.00

F:\Data\Shared Data\Willistown\Sewer\195 Wyllpen Place\Pipe Work Estimate 051314.docx

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 2, 2014

Dear Resident:

On Tuesday, June 10, 2014 the East Goshen Municipal Authority will be rehabilitating the sanitary sewer manhole at the entrance to Fairway Village. Work will commence at 10:30 am and the road will not be closed to traffic.

The Authority has contracted with Abel Recon to rehabilitate the manhole. The work will consist of spraying the inside of the manhole with a polyurethane coating which is a relative new technology.

We negotiated a reduced price with Abel Recon to do the work as a demonstration project. Accordingly, we have invited representatives from several of our neighboring municipalities to attend, so do not be surprised if you see several non-East Goshen Township trucks.

Please call me at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions.

Sincerely,

[Signature: Rick Smith]

Louis F. Smith, Jr
Township Manager

cc: East Goshen Municipal Authority
    East Goshen Board of Supervisors

F:\Data\Shared Data\Public Works Dept\Sewer\General\Fairway Village Manhole Lining 060214.docx

[Logo: ABEL RECON]

You're Invited

East Goshen Twp and Pennoni Assoc. welcome you to a special field demonstration of a complete structural manhole rehabilitation

Save the Date:

Tuesday, June 10 at 11:00 AM
Rain date: Tues., June 17, 2014
Location: 902 Fairway Dr.
Malvern, PA
Lunch will be provided.

ABEL RECON, a certified Sprayroq applicator will be performing a complete manhole rehabilitation demo and review of the application and benefits of Spraywall®. SprayWall® by Sprayroq® is a structural spray applied polyurethane solution for infrastructure rehabilitation, corrosion management, and infiltration.

Demo Highlights:

  • Overview discussion of product attributes, application process and structural rehabilitation
  • Real-time application of the product in the host structure
  • Quick return to service of the structure
  • Q & A period and product samples

Please R.S.V.P.
By Friday
June, 6th,
2014

(717) 285-3103 Tel
(717) 725-0795 Cell
ssnyder@abelrecon.com

Include your name, e-mail and phone number and how many will be attending so that we have an accurate count for the provided lunch.

If you have any questions prior to the demonstration, please contact Scot Snyder at
(717) 285-3103 Tel
(717) 725-0795 Cell
ssnyder@abelrecon.com

We look forward to seeing you there.

Just look for the Big Red ABEL RECON trucks

[Map: Location map showing route via Paoli Pike / Boot Rd / Fairway Dr to 902 Fairway Dr., Malvern, PA]

[Photo: Big red ABEL RECON infrastructure rehabilitation truck at work site with traffic cones and technicians preparing manhole work]

[Photo: Technician in protective suit and helmet spraying polyurethane lining inside manhole opening]

[Photo: ABEL RECON technician in respirator mask, gloves, and protective gear working with hoses in service vehicle, with second worker in protective suit entering manhole below]

About Your Host:

ABEL RECON specializes in the infrastructure rehabilitation field. They offer a wide variety of services (infrastructure cleaning and evaluation, structure rehabilitation, cured-in-place pipelining, and pipeline grouting and chemical root control) to assist authorities and engineering consultants with the growing problem of system maintenance and rehabilitation.

ABEL RECON serves New Jersey, Pennsylvania, Maryland, Delaware, Washington DC and Ohio in assisting authorities and municipalities in system reconditioning, rehabilitation, and protection.

For more information, visit: www.abelrecon.com

[Logo: SPRAYROQ Protective Lining Systems]

About The Technology:

Sprayroq polyurethanes are fast setting, tough, corrosion and abrasion resistant linings that can be spray-applied at any desired thickness in a single mobilization.

The products are ideally designed for applications on surfaces exposed to acids, corrosives and other caustic elements. Environmental and climatic factors such as freeze/thaw cycling, high humidity or shrinking and swelling soil conditions have minimal effect.

With a range of formulas that span applications requiring elastomeric, semi-rigid or rigid (structural) properties, Sprayroq is the source for structural rehabilitation and corrosion protection solutions that provide excellent Return On Investment (ROI) and extension of asset performance life.

For more information, visit: www.sprayroq.com

[Logo: ABEL RECON]

3925 Columbia Avenue
Mountville, PA 17554-0476
717-285-3103
info@abelrecon.com
www.abelrecon.com