Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 20, 2012
Monday 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES January 9, 2012
- APPROVAL OF INVOICES a. Pennoni #494474 $ 220.00 b. Pennoni #494475 $ 4,315.00 c. Pennoni #494477 $ 682.50 d. Lockwood Engineer # 6229 $ 2,600.00 e. Gawthrop Greenwood #95900 $ 476.68 f. Gawthrop Greenwood #96712 $ 1,349.00
- LIAISON REPORTS
- FINANCIAL REPORTS January Report - Pending
- OLD BUSINESS
- GOALS January Goals
- NEW BUSINESS Representative from Miller Environmental to discuss plan; Proposal for Professional Services for Lockwood Chase STP; E-bid results - Lockwood Chase Sewer
- CAPACITY REQUESTS - none
- SEWER REPORTS Director of Public Works Report; Pennoni Report; Miller Environmental Inc Report with DMR’s; East Goshen Township Flows for January 2012 1 st Quarter
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Meetings & Dates of Importance
February 21, 2012 Board of Supervisors 7:00 PM
F:\Data\Shared Data\Agendas\Municipal Authority\2012\2-20-2012 .doc
| February 22, 2012 | Friends of EGT 501c3 | 7:00 PM |
|---|---|---|
| February 23, 2012 | Farmers Market | 3-5:00 PM |
| February 27, 2012 | Deer Management | 7:00 PM |
| March 6, 2012 | Board of Supervisors | 7:00 PM |
| March 7, 2012 | Pension Committee | 1:00 PM |
| March 7, 2012 | Planning Commission | 7:00 PM |
| March 8, 2012 | Farmers Market | 3-5:00 PM |
| March 8, 2012 | Historical Commission | 7:00 PM |
| March 12, 2012 | Municipal Authority | 7:00 PM |
| March14, 2012 | CDC | 7:00 PM |
| March 14, 2012 | Conservancy Board | 7:00 PM |
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| May 2, 2012 | July 1, 2012 |
F:\Data\Shared Data\Agendas\Municipal Authority\2012\2-20-2012 .doc
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
January 9, 2012
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, January 9, 2012 at 7:00pm at the East Goshen Township building. Members in attendance were: Chairman Joe McCawley, Jack Yahraes, Fran Beck, Dana Pizarro and Kevin Cummings. Also in attendance were: Carmen Battavio (Township Supervisor), and Dan Barbato (Pennoni).
Call to Order & Pledge of Allegiance
Joe McCawley called the meeting to order at 7:00pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Joe asked if anyone would be recording the meeting and there was no response.
Chairman’s Report/Other Members’ Reports
Joe asked for nominations for new officers. Everyone agreed to continue the usual rotation. Fran moved to elect Dana as Chairman, Fran as Vice Chairman, Jack as Secretary, Kevin as Treasurer, and Joe as Assistant Secretary/Treasurer. Jack seconded the motion. The motion passed unanimously. Jack presented Joe with a golden plunger and Carmen thanked him for all of his time and effort as Chairman.
Approval of Minutes
The new Chairman noted that the minutes of the December 12, 2011 meeting were approved as corrected.
Approval of Invoices
Joe moved to approve payment of the following invoices:
- Pennoni #491508, $907.50
- Pennoni #491509, $1,510.00
- Pennoni #491510, $1,210.00
- Pennoni #491512, $810.00
Fran seconded the motion. Dana commented that he doesn’t think the $907.50 includes everything for December. Dan said a few hours for a meeting were not included. There was no further discussion. The motion passed unanimously.
The Clinger invoice was tabled until the next meeting.
Liaison Reports - None
Financial Reports – Were reviewed
Old Business
1. Dana mentioned the life cycle analysis which will show cost savings that the upgrade of the treatment plan will give to the Township. Dan has done the first analysis. Dana would like to have all of the analyses on one spreadsheet when they are done. He estimates the return will
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 01-09-12 draft.doc 1
be 5-8 years. The expense of keeping the plant running during the construction should be included.
2. In future bid documents, Joe would like to see multiple primes, so, if one is extended, the others will be too.
3. Lockwood Chase will be passive open space and turned over to the Home Owners Association and will be put back to its original state.
Goals
- Newsletter - Kevin will prepare the next newsletter article about grease. Dana will provide some information to him. Kevin asked Dan for something about the bacteria formed by the grease. Jack will do May’s article about the life cycle analysis.
- Jack will attend the March West Goshen meeting.
New Business
- Pennoni presented a proposal for 2012 listing hourly rates, services that will be provided, and allocation of the estimated $37,000 fee for annual services. Fran moved to accept the proposal. Joe seconded the motion. Dana commented that the allocation for monthly meetings is down by $2,500 for 2012. Dan confirmed that and mentioned that Chapter 94 reports will be slightly up and after March, Rick was to continue doing INI reports for internal use only. There being no further discussion a vote was taken. The motion passed unanimously.
- There was discussion about concerns with the operation of the plant. It was decided to ask Miller Environmental representatives to attend the next meeting.
Capacity Requests
None.
Sewer Reports
- Director of Public Works Report: Meters – They were read on a daily basis as well as the portable meters.; CC Collection – The main breaks that were located in Supplee Valley have been repaired. We are in the process of televising some laterals that were active when they were televising. The Public Works Department has to excavate Strasburg Road on Thursday to replace a broken manhole cover. The pumping stations were visited on a daily basis for routine maintenance. The number one pump at Ashbridge had to be pulled and sent out for repair when the main seal went bad causing the motor to trip out on overload. We were notified of a sewer lateral blockage on Barker Drive. The Public Works Dept. was able to clear the blockage by using a plunge ring in the stack pipe. We placed a dozen vent caps for the month; Lockwood Plant – Routine maintenance was performed during the month.; RC Collection – The pumping station was visited on a daily basis as part of our routine maintenance.; Ridley Plant: The Public Works Department performed routine maintenance during the month of December. The trough was vacuumed out in the screen room. The parts arrived for the UV chamber. We will schedule the bulb replacement later this month.
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 01-09-12 draft.doc 2
The burned out UV rack was delivered to Siemens for repairs. We hope to have it back by the end of the month.
- Alarms – 34 alarms were received for December.
- PA One Calls – Public Works Dept. responded to 117 PA One Calls.
- Pennoni – Dan gave the following report: Invoices - with summaries were provided under separate cover. Ridley Creek Sewage Treatment Plant – Tim Daily and Dan Barbato met with Mark Miller and Rick Smith to discuss the current operation of the plant by Miller Environmental. We received plan operating data and trends from Scott Towler. Further review, if necessary, will be complete after Miller Environmental prepares their report to the Authority. I/I Metering Project The Township continues to meter flows at selected locations. Temporary meters are in operation at locations as recommended. Upon receipt of tributary connection data from the Township, Pennoni will review permanent meter data (particularly in the Chester Creek Service Area), make recommendations for 2012 temporary metering, and identify potential I&I problem areas. Ridley Creek Consent Order The final report is due in March of 2012. Reports after this date will continue but will be for internal Authority use only. LCSTP Elimination The Chester County Conservation District issued an E&SPC adequacy letter on December 6, and the NPDES Permit was issued on December 29. DEP approved the Plant Closure Plan on December 8. All permits and approvals have therefore been obtained.; We are finalizing the specifications, including revisions per comments from Rick Smith. We are also finalizing the bid plans to include the sewer construction work only (the permit plans included both the sewer construction and the Plant closure, but the Township Public Works Dept. will be performing the Plant closure work).; The sewer construction project will be solicited using PennBID’s electronic solicitation website. The proposed solicitation and construction schedule follows: Finalize plans and specifications for final Township review = 1/13/12 Advertise = 1/19/12 and 1/23/12 Optional Pre-Bid Meeting = approx 1/26/12 Bids Due = approx 2/7/12 Award = 2/13/12 Notice to Proceed = approx 3/1/12 Construction (120 days) = approx 3/1/12 – 6/28/12; Finalize plans and specifications for final Township review = 1/13/12; Advertise = 1/19/12 and 1/23/12; Optional Pre-Bid Meeting = approx 1/26/12; Bids Due = approx 2/7/12; Award = 2/13/12; Notice to Proceed = approx 3/1/12; Construction (120 days) = approx 3/1/12 – 6/28/12 Hershey Mill PS Diversion, Reserve PS Elimination Planning In early November, survey stakeout was performed for preliminary sewer alignments, followed by a field recon to evaluate the alignments. They forwarded recommended
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 01-09-12 draft.doc 3
adjustments to the Township. Upon receipt of comments and responses from the Township, they will finalize plans and permitting applications.
Marydell PS Elimination Planning
- DEP approved the Planning Module on December 7, 2011.
- In early November, preliminary field stakeout of the sewer was completed and our recommendations were sent to the Township for consideration. Upon receipt of comments and responses from the Township we will prepare plans and permitting applications.
Applebrook Spray Irrigation NPDES Permit Renewal
- The NPDES discharge permit was submitted to DEP on June 15. DEP sent a letter confirming that the application is administratively complete and is undergoing technical review. They called DEP several times over the past month for a status update but have not received a return call.
- Miller Environmental Inc. provided the following report on Operation and Maintenance activities for the month of December 2011: Routine Operation and Maintenance Activities: Daily sampling, testing and inspections for permit compliance; Routing daily testing for process optimization; Microscopic exams indicate filaments may be reappearing.; The Biomass is being watched closely due to excessive grease being introduced to the treatment process.; Wells to be sampled in December.; Cleaned grease from influent wet well daily.; Inspection of equipment in all phases of the treatment process; Daily cleaning of muffin monster; Clean out disc filters weekly; Clean off DO proves and verify readings with hand held DO probe Non-Routine Operations and Maintenance Activities UV Banks being modified; Cleaned around bug light by effluent channel; Throttled back #2 disc filter to even out flows between filters Items of Concern Influent sampler is freezing up in cold weather; Centrifuge parts have not been installed to date.; UV parts have not been installed to date; SBR blowers are not hitting the peak of 3ppm in SBR 4 and sometimes SBR 2; Dialer is not calling out when the generator exercises or is called to run; Ammonia exceeded the permit limits during the month of November. As of today (1/6/12 date of report) ammonia is in compliance in SBR 2, 3, 4 and effluent.; SBR 1 needs to be cleaned, DO probe needs to be taken off-line and stored
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 01-09-12 draft.doc 4
Items on Schedule for January
- Sludge dewatering
- Continued monitoring of filaments in reactors due to grease and possible solutions.
- Extensive attention to bringing ammonia back into compliance
Summary of December Influent Flow – Ridley Creek
- Average - .378 mgd
- Maximum - .533 mgd
Summary of December Discharge – Lockwood
- Average – 11,700 gpd
Permit Compliance
Ridley had a minor eDMR exceedence for DO related to a new operator taking a dissolved oxygen reading during a non-decant cycle. The operator has been given the proper instruction as to when the samples should be taken.
Any Other Matter - None
Correspondence and Reports of Interest
1. Ridley Creek NPDES – Tim and Dan are going through the permits and will provide any comments.
2. Lockwood Chase Discharge for Stormwater Construction Activities – No Comments
3. Ridley Creek Audit – The audit provided by Maillie, Falconiero & Company LLP was reviewed. It is regarding the H20 PA Grant from the Department of community and Economic Development. Dana thanked Joe for his efforts in getting this grant.
Public Comment – None
Adjournment
There being no further business, Kevin moved to adjourn the meeting. Joe seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:50pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 01-09-12 draft.doc 5
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 494474 Invoice Date : 01/23/2012 Project : EGMA1100 Project Name : 2011 Annual Services |
|---|
For Services Rendered through: 01/15/2012
December Authority meeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 220.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 220.00 |
| Amount Due This Invoice | $220.00 |
|---|
| Fee : | 12,500.00 |
|---|---|
| Prior Billings : | 12,222.50 |
| Current Billings : | 220.00 |
| Total Billings : | 12,442.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 110.00 | 220.00 |
| Labor Total: | 2.00 | 220.00 |
| Total Phase : **** -- Professional Services | Labor : | $220.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1100 -- 2011 Annual Services | Labor : | $220.00 |
|---|---|---|
| Expense : | $0.00 |
[Handwritten: ok rc]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1100 Invoice Summary
Invoice Date 12-27-2011
| Project: | 2011 Annual Services | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1100 | ||
| Invoice No: | 494474 | ||
| Invoice Period: | 12/12/2011 | to | 1/15/2012 |
| Initial Authorization: | $ 10,000.00 | Date: | 12/13/2010 |
| Changes: | $2,500 | Date: | 10/10/2011 |
| Contract Amount: | $ 12,500.00 | ||
| Previously Invoiced: | $ 12,222.50 | ||
| Current Invoice: | $ 220.00 | ||
| Invoiced to Date ($): | $ 12,442.50 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 57.50 | ||
| Remaining Budget (%): | 0% | ||
Budget by Phase:
| Phase No. | **** | |
|---|---|---|
| Phase Name: | 2011 Annual Services | |
| Phase Budget: | $ | 12,500.00 |
| Previously Invoiced: | $ | 12,222.50 |
| Current Invoice: | $ | 220.00 |
| Invoiced to Date ($): | $ | 12,442.50 |
| Invoiced to Date (%): | 100% | |
| Remaining Budget ($): | $ | 57.50 |
| Remaining Budget (%): | 0% | |
Comments: December Authority meeting.
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 494475 Invoice Date : 01/23/2012 Project : EGMA1105 Project Name : LCSTP Final Design & Permitting |
|---|
For Services Rendered through: 01/15/2012
Finalize alignments, prepare bid plan sets and specifications for client review.
Phase : 2 -- Sewer Stakeout and Easements
| Total Phase : 2 -- Sewer Stakeout and Easements | Labor : | 4,232.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 4,232.50 |
Phase : 4 -- NPDES (E&SPC) Permitting
| Total Phase : 4 -- NPDES (E&SPC) Permitting | Labor : | 82.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 82.50 |
| Amount Due This Invoice | $4,315.00 |
|---|
| Fee : | 77,800.00 |
|---|---|
| Prior Billings : | 47,437.38 |
| Current Billings : | 4,315.00 |
| Total Billings : | 51,752.38 |
[Handwritten: ok rc]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
| Project : EGMA1105 -- LCSTP Final Design & Permitting | Invoice # : 494475 |
|---|
...Continued from previous page
Phase : 2 -- Sewer Stakeout and Easements
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 7.00 | 110.00 | 770.00 |
| Project Engineer | 18.75 | 90.00 | 1,687.50 |
| Associate Engineer | 10.00 | 80.00 | 800.00 |
| Engineering Technician I | 15.00 | 65.00 | 975.00 |
| Labor Total: | 50.75 | 4,232.50 |
| Total Phase : 2 -- Sewer Stakeout and Easements | Labor : | $4,232.50 |
|---|---|---|
| Expense : | $0.00 |
Phase : 4 -- NPDES (E&SPC) Permitting
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 110.00 | 82.50 |
| Labor Total: | 0.75 | 82.50 |
| Total Phase : 4 -- NPDES (E&SPC) Permitting | Labor : | $82.50 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1105 -- LCSTP Final Design & Permitting | Labor : | $4,315.00 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page: 2
East Goshen Municipal Authority
EGMA1105 Invoice Summary
Invoice Date 12-27-2011
| Project: | EGMA1105 | ||
|---|---|---|---|
| Pennoni Job No.: | LCSTP Final Design & Permitting | ||
| Invoice No: | 494475 | ||
| Invoice Period: | 12/12/2011 | to | 1/15/2012 |
| Initial Authorization: | $ 77,800.00 | Date: | 5/5/2011 |
| Contract Amount: | $ 77,800.00 | ||
| Previously Invoiced: | $ 47,437.38 | ||
| Current Invoice: | $ 4,315.00 | ||
| Invoiced to Date ($): | $ 51,752.38 | ||
| Invoiced to Date (%): | 67% | ||
| Remaining Budget ($): | $ 26,047.62 | ||
| Remaining Budget (%): | 33% | ||
Budget by Phase:
| Phase No. | **** | |
|---|---|---|
| Phase Name: | LCSTP Final Design & Permitting | |
| Phase Budget: | $ | 77,800.00 |
| Previously Invoiced: | $ | 47,437.38 |
| Current Invoice: | $ | 4,315.00 |
| Invoiced to Date ($): | $ | 51,752.38 |
| Invoiced to Date (%): | 67% | |
| Remaining Budget ($): | $ | 26,047.62 |
| Remaining Budget (%): | 33% | |
Comments: Finalize alignments, prepare bid plan sets and specifications for client review.
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 494477 Invoice Date : 01/23/2012 Project : EGMA1108 Project Name : Ridley Creek Operating |
|---|
For Services Rendered through: 01/15/2012
Review STP operating data provided by S. Towler and the Authority, meeting with M. Miller and R. Smith to discuss plant operations.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 682.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 682.50 |
| Amount Due This Invoice | $682.50 |
|---|
| Fee : | 2,500.00 |
|---|---|
| Prior Billings : | 1,751.00 |
| Current Billings : | 682.50 |
| Total Billings : | 2,433.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Senior Engineer | 6.50 | 105.00 | 682.50 |
| Labor Total: | 6.50 | 682.50 |
| Total Phase : **** -- Professional Services | Labor : | $682.50 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1108 -- Ridley Creek Operating | Labor : | $682.50 |
|---|---|---|
| Expense : | $0.00 |
[Handwritten: ok MSM 2/17/2012]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1108 Invoice Summary
Invoice Date 12-27-2011
| Project: | EGMA1108 | ||
|---|---|---|---|
| Pennoni Job No.: | Ridley Creek Operating | ||
| Invoice No: | 494477 | ||
| Invoice Period: | 12/12/2011 | to | 1/15/2012 |
| Initial Authorization: | $ 2,500.00 | Date: | 10/4/2011 |
| Contract Amount: | $ 2,500.00 | ||
| Previously Invoiced: | $ 1,751.00 | ||
| Current Invoice: | $ 682.50 | ||
| Invoiced to Date ($): | $ 2,433.50 | ||
| Invoiced to Date (%): | 97% | ||
| Remaining Budget ($): | $ 66.50 | ||
| Remaining Budget (%): | 3% | ||
Budget by Phase:
| Phase No. | **** | |
|---|---|---|
| Phase Name: | Hershey Mill & Reserve | |
| Phase Budget: | $ | 2,500.00 |
| Previously Invoiced: | $ | 1,751.00 |
| Current Invoice: | $ | 682.50 |
| Invoiced to Date ($): | $ | 2,433.50 |
| Invoiced to Date (%): | 97% | |
| Remaining Budget ($): | $ | 66.50 |
| Remaining Budget (%): | 3% | |
Comments: Review STP operating data provided by S. Towler and the Authority, meeting with M. Miller and R. Smith to discuss plant operations.
[Earthcore Services Logo]
EARTHCORE services
1458 Shaner Drive Pottstown, PA 19465
p (610) 404-2570 f (610) 404-2580
rick@earthcoreusa.com
2/8/2012
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380 Attn: Rick Smith |
Invoice #: 6229 Job: Lockwood Chase Completion Date: 2/8/2012 |
|---|
| Mobilization | 800.00 |
|---|---|
| ATV Rig, auger probes | 1,800.00 |
[Handwritten: ok RS
Lockwood Engineering]
| Total: | $2,600.00 |
|---|
Thank you for your business. Prompt payment is appreciated and will result in the best rates on future projects. If full payment is not received within agreed upon terms, interest shall be charged at the legal rate allowed. The customer is responsible for all reasonable attorney fees and collection costs incurred.
[Gawthrop Greenwood, PC Attorneys at Law Logo]
| Gawthrop Greenwood, PC Attorneys at Law 17 East Gay Street, Suite 100 West Chester, PA 19381-0562 gglaw@gawthrop.com |
(p) 610-696-8225 (f) 610-344-0922 www.gawthrop.com |
|---|
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 12/31/2011 Client No: 6604-01M Invoice No. 95900 |
|---|
General Authority Services
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 12/12/2011 RFA |
Review packet for Authority meeting on 12/12/11; attend regular meeting of Municipal Authority. | 2.50 | |
| For Current Services Rendered | 2.50 | 475.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.50 | $190.00 | $475.00 |
Expenses
| Postage | 1.68 |
|---|---|
| Total Expenses Thru 12/31/2011 | 1.68 |
| Previous Balance | $680.48 |
|---|---|
| Total Current Charges | 476.68 |
| 01/05/2012 | Cost Advance Payment | -168.00 |
|---|---|---|
| 01/05/2012 | Cost Expense Payment | -5.48 |
| 01/05/2012 | Fee Payment | -507.00 |
| Total Payments | -680.48 | |
| Balance Due | $476.68 |
|---|
[Handwritten: OK RS
1-10]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
[Gawthrop Greenwood, PC Attorneys at Law Logo]
| Gawthrop Greenwood, PC Attorneys at Law 17 East Gay Street, Suite 100 West Chester, PA 19381-0562 gglaw@gawthrop.com |
(p) 610-696-8225 (f) 610-344-0922 www.gawthrop.com |
|---|
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 12/31/2011 Client No: 6604-01M Invoice No. 95900 |
|---|
General Authority Services
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 12/12/2011 RFA |
Review packet for Authority meeting on 12/12/11; attend regular meeting of Municipal Authority. | 2.50 | |
| For Current Services Rendered | 2.50 | 475.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.50 | $190.00 | $475.00 |
Expenses
| Postage | 1.68 |
|---|---|
| Total Expenses Thru 12/31/2011 | 1.68 |
| Previous Balance | $680.48 |
|---|---|
| Total Current Charges | 476.68 |
| 01/05/2012 | Cost Advance Payment | -168.00 |
|---|---|---|
| 01/05/2012 | Cost Expense Payment | -5.48 |
| 01/05/2012 | Fee Payment | -507.00 |
| Total Payments | -680.48 | |
| Balance Due | $476.68 |
|---|
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
[Gawthrop Greenwood, PC Attorneys at Law Logo]
| Gawthrop Greenwood, PC Attorneys at Law 17 East Gay Street, Suite 100 West Chester, PA 19381-0562 gglaw@gawthrop.com |
(p) 610-696-8225 (f) 610-344-0922 www.gawthrop.com |
|---|
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 01/31/2012 Client No: 6604-01M Invoice No. 96712 |
|---|
General Authority Services
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 01/09/2012 RFA |
Review packet for meeting of Municipal Authority of 1/9/12. | 0.50 | |
| 01/25/2012 SRM |
Review contract for Lockwood; memo regarding changes to contract. | 3.00 | |
| 01/26/2012 RFA |
Review messages from Rick Smith regarding release of bid documents; review Steve McDonnell memos regarding Lockwood contract revisions; Message to Rick Smith regarding suggested revisions; review message from Smith regarding incorporation of revisions in Lockwood contract; Message to Rick Smith and Michael Ellis regarding document revisions. | 1.80 | |
| 01/30/2012 RFA |
Review revised agreement incorporating recommended changes in language; Message to Michael Ellis commenting on revised contract language for Lockwood project. | 0.80 | |
| SRM | Review of edits. | 1.00 | |
| For Current Services Rendered | 7.10 | 1,349.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 3.10 | $190.00 | $589.00 |
| Stephen R. McDonnell | 4.00 | 190.00 | 760.00 |
| Previous Balance | $476.68 |
|---|---|
| Total Current Charges | 1,349.00 |
| Balance Due | $1,825.68 |
|---|
[Handwritten: OK RS, circled: $1,825.68]
| East Goshen Municipal Authority General Authority Services |
Page: 2 01/31/2012 Client No: 6604-01M Invoice No. 96712 |
|---|
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
2012
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
JANUARY REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/8/12 - Kevin; Need by 5/9/12; Need by 8/8/12; Need by 11/14/12; February 2013
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March); 2 nd Quarter (June); 3 rd Quarter (September); 4 th Quarter (December)
- Respond to capacity requests in 45 days or less.
- Implement I & I Plan
- Conduct a sewer facilities tour after RCSTP construction is complete
PROJECTS
- Lockwood Bid; Pipe Installation; Abandon Plant
- Marydell Pump Station Design/Permit; Bid; Pipe Installation; Abandon Pump Station
- Hershey Mill Pump station Design/Permit; Bid; Pipe Installation
- Reserve Pump station Design/Permit; Bid; Pipe Installation; Abandon Pump Station
- Open House at the RCSTP 2012 after grass is fully established
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2012\010912.doc
[Logo: Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS]
February 15, 2012
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Proposal for Professional Services
Lockwood Chase Sewage Treatment Plant Elimination Construction Phase Services
Dear Mr. Smith:
Pennoni Associates Inc. is pleased to submit the following proposal for the construction phase services associated with the decommissioning of the Lockwood Chase Sewage Treatment Plant (LCSTP).
BACKGROUND
This project has been initiated as a result of the Draft Water Quality Management (WQM) Permit for the LCSTP issued by the Pennsylvania Department of Environmental Protection (PADEP) on February 23, 2007. The Draft Permit requires the Township to: (1) install an influent flow meter to the treatment plant; (2) drill monitoring wells MW-1 and MW-5 deeper; (3) increase the chemical and physical characteristics that the groundwater wells are monitored for; (4) provide a method of measuring the spray volume applied to each spray field/zone; (5) control spray application rates to the rates specified in the permit; (6) verify that the volume of storage in the polishing pond is at least 1.4 million gallons; and (7) improve treated effluent quality.
Pennoni and the Township met with the PADEP following issuance of the Draft Permit to discuss the approach to addressing the new permit requirements. Pennoni prepared the Township Wastewater Needs Evaluation, dated April 16, 2007, and the Lockwood Chase Sewage Treatment Plant Study, dated February 22, 2008. These studies ultimately recommended abandoning the LCSTP and diverting wastewater flows to the West Goshen Service Area via decommissioning of the LCSTP and a gravity sewer extension. Pennoni prepared the Act 537 Plan Update Revision for the Lockwood Chase Sewage Treatment Plant Elimination, last revised June 2010 with a partial supplemental submission to the PADEP on February 17, 2011, which was ultimately approved by the PADEP on March 29, 2011.
Contractor bidding for the project closed on February 15, 2012 at 10:00 am, and a recommendation for award is pending at the time of this proposal.
Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
February 15, 2012
Page 2
Rick Smith
LCSTP Construction Phase Support
SCOPE OF WORK
The scope of work for this phase of the project includes construction inspection and office support with specific details as follows.
Construction Inspection: Part-time construction inspection for critical construction activities including:
- Preconstruction meeting
- Site clearing
- Stakeout
- E&S installation
- Flow diversions
- Sewer connections
- Plant demolition
- Bypass pumping
- Meeting with Chester County Conservation District
- Restoration
- Final inspection
We have included a total of 120 hours of inspection time over the four-month project duration.
Office Support: Pennoni’s design engineer will provide support on the project with responses to contractor requests for information (RFIs), questions or requests for clarification from the Authority, support of the construction inspector, review of contractor requests for payment and change order requests, and project closeout documentation. We will also prepare survey control data, coordinates, and limited CAD files for contractor use in stakeout of key features.
FEE
Our estimated fee, to be billed on a time and material basis, is Sixteen Thousand Dollars ($16,000).
Work will be done on an hourly basis, billed at the Authority’s approved rates for Pennoni for 2012.
Extraordinary expenses, authorized in advance and identifiable to the specific project will be billed in addition to the above stated fees. These expenses include, but are not limited to: permit application fees, Federal Express and delivery charges, and the reproduction of plans and specifications by outside services. We do not bill for such items as relatively small amounts of in-house printing, mailing expenses, reasonable telephone calls, and travel expenses.
February 15, 2012
Page 3
Rick Smith
LCSTP Construction Phase Support
BILLING AND PAYMENT
Fees will be billed monthly based on actual services completed. Payment is due upon receipt of invoice. Billing and Payment shall be in accordance with Item three (3) of the attached General Terms and Conditions.
The client acknowledges that the method of Billing and Payment has been discussed in detail; that the terms agreed upon can only be changed by a written addendum agreed to by both parties; and work may be stopped until payment is made in accordance with the agreement.
TERMS AND CONDITIONS
General
Pennoni Associates Inc. General Terms and Conditions (Form No. LE01, Rev. 09/2002) as approved with our contract with the Authority are considered as part of this proposal.
Special
- Revisions to the plans or documents as a result of personal preferences of contractors, reviewing agencies, agency consultants, and the client will be performed as additional work on an hourly basis.
- We assume that a reasonable and customary number of contractor RFIs will be processed, and that submittals will be generally accurate and complete, with relatively minimal revisions required by the design engineer. Processing of excessive RFIs and repetitive markups of submittals will be billed on a time and materials basis as additional work.
- Inspection time is limited to 120 hours in aggregate between the field inspector and the design engineer. Additional time, if requested, will be billed on a time and materials basis.
- This proposal is limited strictly to those items quoted above.
We appreciate this opportunity to submit our proposal to the Authority. Should you have any questions or need additional information, please do not hesitate to call. Please sign and return one (1) copy of this proposal as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
[Signature: Daniel P. Barbato]
Daniel P. Barbato, P.E.
Authority Engineer
February 15, 2012
Page 4
Rick Smith
LCSTP Construction Phase Support
ACCEPTED BY: ________________________________________
(Print Name and Title)
DATE: ________________________________________
P:\Projects\EGMA\EGMA0703 LCSTP Planning\Proposal\Design & Permitting\LCSTP Elimination Design & Permitting PROPOSAL.doc
eBid eXchange Export
Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSION No. SS-2012-1
Generated 2/15/2012 10:02 AM Eastern
| Number | Type | Description | Unit Of Measure | Quantity | SJM Construction Company, Inc. | Anrich,Inc. | Ron Smith Inc. | B Excavating, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | BASE | Installation, Maintenance, and Removal o | LS | 1 | $21,900.00 | $10,000.00 | $10,000.00 | $17,758.85 |
| 2 | BASE | 8 Sanitary Sewer Main in Paved Areas. Pri | LF | 484 | $34,364.00 | $48,400.00 | $34,523.72 | $50,432.80 |
| 3 | BASE | 8 Sanitary Sewer Main in Non-Paved Area | LF | 814 | $29,181.90 | $61,050.00 | $42,930.36 | $37,362.60 |
| 4 | BASE | Manholes. Price complete, in place | EA | 8 | $20,728.00 | $19,200.00 | $27,209.20 | $21,560.00 |
| 5 | BASE | Drop Connection to Existing Manhole EXM | LS | 1 | $5,448.00 | $500.00 | $3,815.70 | $2,445.00 |
| 6 | BASE | 4 Laterals. Price complete, in place | LF | 99 | $4,286.70 | $3,465.00 | $4,031.28 | $13,634.28 |
| 7 | BASE | Cleanouts. Price complete, in place | EA | 6 | $6,348.00 | $1,500.00 | $2,198.10 | $2,040.00 |
| 8 | BASE | 8 Superpave 25 mm Base Course Paving. | SY | 240 | $15,120.00 | $13,200.00 | $27,220.80 | $12,972.00 |
| 9 | BASE | In-Kind Concrete Curb Replacement. Pric | LF | 140 | $4,900.00 | $4,900.00 | $5,397.00 | $3,990.00 |
| 10 | BASE | Abandon Existing 8 Sewer Main. Price co | LF | 766 | $3,140.60 | $2,298.00 | $6,825.06 | $10,923.16 |
| 11 | BASE | Abandon Existing Manholes. Price compl | EA | 2 | $2,170.00 | $600.00 | $4,098.00 | $4,074.42 |
| 12 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $4,050.00 | $1,250.00 | $500.00 | $1,750.00 |
| 13 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $2,375.00 | $1,250.00 | $250.00 | $1,000.00 |
| 14 | BASE | Concrete Encasement. Price complete, in | LF | 100 | $3,367.00 | $4,000.00 | $1,500.00 | $4,655.00 |
| 15 | BASE | Clearing. Price complete, in place | LS | 1 | $8,000.00 | $16,500.00 | $10,000.00 | $4,000.00 |
| 16 | BASE | Rock Removal. Price complete, in place | CY | 75 | $7,500.00 | $75.00 | $7,500.00 | $2,982.75 |
| TOTAL BASE BID | $172,879.20 | $188,188.00 | $187,999.22 | $191,580.86 | ||||
| 17 | ADD | Demolish and Re-build Existing Drop Conr | LS | 1 | $5,300.00 | $1,500.00 | $3,250.00 | $4,672.95 |
| TOTAL AMOUNT BID WITH ADD ITEM | $178,179.20 | $189,688.00 | $191,249.22 | $196,253.81 | ||||
| 10% BID BOND SUBMITTED? | Yes | Yes | Yes | Yes |
eBid eXchange Export
Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSION No. SS-201
Generated 2/15/2012 10:02 AM Eastern
| Number | Type | Description | Unit Of Measure | Quantity | Land Tech Enterprises | Joao Bradley Construction Co., Inc. | Trinity Excavating, Inc. | Dirt work solutions |
|---|---|---|---|---|---|---|---|---|
| 1 | BASE | Installation, Maintenance, and Removal o | LS | 1 | $23,000.00 | $16,000.00 | $32,446.00 | $18,520.00 |
| 2 | BASE | 8 Sanitary Sewer Main in Paved Areas. Pri | LF | 484 | $43,560.00 | $41,624.00 | $40,472.08 | $61,226.00 |
| 3 | BASE | 8 Sanitary Sewer Main in Non-Paved Area | LF | 814 | $40,700.00 | $45,584.00 | $50,598.24 | $50,671.50 |
| 4 | BASE | Manholes. Price complete, in place | EA | 8 | $26,800.00 | $30,400.00 | $30,000.00 | $13,200.00 |
| 5 | BASE | Drop Connection to Existing Manhole EXM | LS | 1 | $2,900.00 | $3,900.00 | $2,800.00 | $5,080.00 |
| 6 | BASE | 4 Laterals. Price complete, in place | LF | 99 | $4,455.00 | $6,336.00 | $5,416.29 | $15,048.00 |
| 7 | BASE | Cleanouts. Price complete, in place | EA | 6 | $2,400.00 | $3,000.00 | $3,900.00 | $1,200.00 |
| 8 | BASE | 8 Superpave 25 mm Base Course Paving. | SY | 240 | $17,520.00 | $12,000.00 | $18,453.60 | $18,513.60 |
| 9 | BASE | In-Kind Concrete Curb Replacement. Pric | LF | 140 | $5,600.00 | $9,800.00 | $6,720.00 | $4,536.00 |
| 10 | BASE | Abandon Existing 8 Sewer Main. Price co | LF | 766 | $3,830.00 | $3,064.00 | $6,748.46 | $3,140.60 |
| 11 | BASE | Abandon Existing Manholes. Price compl | EA | 2 | $1,940.00 | $1,440.00 | $1,250.00 | $1,100.00 |
| 12 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $2,500.00 | $2,600.00 | $1,500.00 | $1,324.00 |
| 13 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $1,250.00 | $1,300.00 | $1,100.00 | $360.00 |
| 14 | BASE | Concrete Encasement. Price complete, in | LF | 100 | $7,000.00 | $6,200.00 | $5,250.00 | $1,540.00 |
| 15 | BASE | Clearing. Price complete, in place | LS | 1 | $5,400.00 | $5,000.00 | $3,000.00 | $5,750.00 |
| 16 | BASE | Rock Removal. Price complete, in place | CY | 75 | $7,500.00 | $16,125.00 | $5,625.00 | $13,275.00 |
| TOTAL BASE BID | $196,355.00 | $204,373.00 | $215,279.67 | $214,484.70 | ||||
| 17 | ADD | Demolish and Re-build Existing Drop Conr | LS | 1 | $1,150.00 | $4,600.00 | $1,700.00 | $5,080.00 |
| TOTAL AMOUNT BID WITH ADD ITEM | $197,505.00 | $208,973.00 | $216,979.67 | $219,564.70 | ||||
| 10% BID BOND SUBMITTED? | Yes | Yes | Yes | NO |
eBid eXchange Export
Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSION No. SS-201
Generated 2/15/2012 10:02 AM Eastern
| Number | Type | Description | Unit Of Measure | Quantity | Betta Construction Co., LLC | Mckenney Construction | JFC Contractors, Inc. | Barwis Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | BASE | Installation, Maintenance, and Removal o | LS | 1 | $5,000.00 | $17,699.00 | $4,000.00 | $19,970.03 |
| 2 | BASE | 8 Sanitary Sewer Main in Paved Areas. Pri | LF | 484 | $62,678.00 | $79,192.08 | $67,760.00 | $60,500.00 |
| 3 | BASE | 8 Sanitary Sewer Main in Non-Paved Area | LF | 814 | $60,643.00 | $34,595.00 | $81,400.00 | $50,500.56 |
| 4 | BASE | Manholes. Price complete, in place | EA | 8 | $21,600.00 | $31,200.00 | $32,000.00 | $25,046.48 |
| 5 | BASE | Drop Connection to Existing Manhole EXM | LS | 1 | $6,750.00 | $4,000.00 | $11,000.00 | $11,589.35 |
| 6 | BASE | 4 Laterals. Price complete, in place | LF | 99 | $5,544.00 | $2,400.75 | $9,900.00 | $9,766.35 |
| 7 | BASE | Cleanouts. Price complete, in place | EA | 6 | $1,200.00 | $1,350.00 | $1,800.00 | $1,162.44 |
| 8 | BASE | 8 Superpave 25 mm Base Course Paving. | SY | 240 | $15,720.00 | $25,200.00 | $12,000.00 | $19,348.80 |
| 9 | BASE | In-Kind Concrete Curb Replacement. Pric | LF | 140 | $5,600.00 | $5,460.00 | $7,000.00 | $7,813.40 |
| 10 | BASE | Abandon Existing 8 Sewer Main. Price co | LF | 766 | $5,362.00 | $4,021.50 | $3,830.00 | $16,269.84 |
| 11 | BASE | Abandon Existing Manholes. Price compl | EA | 2 | $2,000.00 | $2,800.00 | $3,000.00 | $1,613.52 |
| 12 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $2,500.00 | $2,900.00 | $1,750.00 | $2,222.00 |
| 13 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $2,500.00 | $1,850.00 | $1,250.00 | $847.00 |
| 14 | BASE | Concrete Encasement. Price complete, in | LF | 100 | $1,000.00 | $3,600.00 | $4,500.00 | $5,200.00 |
| 15 | BASE | Clearing. Price complete, in place | LS | 1 | $5,000.00 | $8,800.00 | $7,000.00 | $17,952.21 |
| 16 | BASE | Rock Removal. Price complete, in place | CY | 75 | $11,250.00 | $8,625.00 | $13,125.00 | $8,250.00 |
| TOTAL BASE BID | $214,347.00 | $233,693.33 | $261,315.00 | $258,051.98 | ||||
| 17 | ADD | Demolish and Re-build Existing Drop Conr | LS | 1 | $10,000.00 | $5,800.00 | $3,000.00 | $11,553.15 |
| TOTAL AMOUNT BID WITH ADD ITEM | $224,347.00 | $239,493.33 | $264,315.00 | $269,605.13 | ||||
| 10% BID BOND SUBMITTED? | Yes | Yes | Yes | Yes |
eBid eXchange Export
Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSION No. SS-201
Generated 2/15/2012 10:02 AM Eastern
| Number | Type | Description | Unit Of Measure | Quantity | Delaware Valley Utility Contractors, Inc | Technivate Inc. | Bulldog Construction | Chester County Site Contractors |
|---|---|---|---|---|---|---|---|---|
| 1 | BASE | Installation, Maintenance, and Removal o | LS | 1 | $45,200.00 | $35,362.00 | $18,500.00 | $29,704.38 |
| 2 | BASE | 8 Sanitary Sewer Main in Paved Areas. Pri | LF | 484 | $44,528.00 | $64,372.00 | $65,340.00 | $92,182.64 |
| 3 | BASE | 8 Sanitary Sewer Main in Non-Paved Area | LF | 814 | $39,886.00 | $40,700.00 | $73,260.00 | $34,407.78 |
| 4 | BASE | Manholes. Price complete, in place | EA | 8 | $54,240.00 | $27,392.00 | $28,000.00 | $19,945.84 |
| 5 | BASE | Drop Connection to Existing Manhole EXM | LS | 1 | $7,960.00 | $7,439.00 | $8,500.00 | $27,283.46 |
| 6 | BASE | 4 Laterals. Price complete, in place | LF | 99 | $9,504.00 | $5,247.00 | $16,335.00 | $16,272.63 |
| 7 | BASE | Cleanouts. Price complete, in place | EA | 6 | $3,360.00 | $3,174.00 | $3,600.00 | $1,227.30 |
| 8 | BASE | 8 Superpave 25 mm Base Course Paving. | SY | 240 | $15,840.00 | $25,440.00 | $18,000.00 | $9,511.20 |
| 9 | BASE | In-Kind Concrete Curb Replacement. Pric | LF | 140 | $8,120.00 | $5,040.00 | $5,880.00 | $4,543.00 |
| 10 | BASE | Abandon Existing 8 Sewer Main. Price co | LF | 766 | $11,490.00 | $5,515.20 | $4,596.00 | $3,109.96 |
| 11 | BASE | Abandon Existing Manholes. Price compl | EA | 2 | $3,400.00 | $3,988.00 | $2,800.00 | $2,054.78 |
| 12 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $3,125.00 | $3,900.00 | $2,500.00 | $3,982.00 |
| 13 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $2,050.00 | $2,250.00 | $1,500.00 | $2,999.00 |
| 14 | BASE | Concrete Encasement. Price complete, in | LF | 100 | $5,700.00 | $5,350.00 | $4,000.00 | $3,450.00 |
| 15 | BASE | Clearing. Price complete, in place | LS | 1 | $7,200.00 | $6,663.00 | $7,500.00 | $8,873.88 |
| 16 | BASE | Rock Removal. Price complete, in place | CY | 75 | $9,375.00 | $27,525.00 | $15,000.00 | $32,892.00 |
| TOTAL BASE BID | $270,978.00 | $269,357.20 | $275,311.00 | $292,439.85 | ||||
| 17 | ADD | Demolish and Re-build Existing Drop Conr | LS | 1 | $8,000.00 | $11,639.00 | $7,500.00 | $7,613.00 |
| TOTAL AMOUNT BID WITH ADD ITEM | $278,978.00 | $280,996.20 | $282,811.00 | $300,052.85 | ||||
| 10% BID BOND SUBMITTED? | Yes | NO | Yes | Yes |
eBid eXchange Export
Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSION No. SS-201
Generated 2/15/2012 10:02 AM Eastern
| Number | Type | Description | Unit Of Measure | Quantity | joseph t hardy and son inc |
|---|---|---|---|---|---|
| 1 | BASE | Installation, Maintenance, and Removal o | LS | 1 | $21,810.00 |
| 2 | BASE | 8 Sanitary Sewer Main in Paved Areas. Pri | LF | 484 | $96,800.00 |
| 3 | BASE | 8 Sanitary Sewer Main in Non-Paved Area | LF | 814 | $65,120.00 |
| 4 | BASE | Manholes. Price complete, in place | EA | 8 | $56,000.00 |
| 5 | BASE | Drop Connection to Existing Manhole EXM | LS | 1 | $24,390.00 |
| 6 | BASE | 4 Laterals. Price complete, in place | LF | 99 | $11,880.00 |
| 7 | BASE | Cleanouts. Price complete, in place | EA | 6 | $600.00 |
| 8 | BASE | 8 Superpave 25 mm Base Course Paving. | SY | 240 | $15,000.00 |
| 9 | BASE | In-Kind Concrete Curb Replacement. Pric | LF | 140 | $4,200.00 |
| 10 | BASE | Abandon Existing 8 Sewer Main. Price co | LF | 766 | $2,298.00 |
| 11 | BASE | Abandon Existing Manholes. Price compl | EA | 2 | $600.00 |
| 12 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $50.00 |
| 13 | BASE | Miscellaneous Excavation and Backfill wit | CY | 50 | $50.00 |
| 14 | BASE | Concrete Encasement. Price complete, in | LF | 100 | $100.00 |
| 15 | BASE | Clearing. Price complete, in place | LS | 1 | $5,000.00 |
| 16 | BASE | Rock Removal. Price complete, in place | CY | 75 | $7,500.00 |
| TOTAL BASE BID | $311,398.00 | ||||
| 17 | ADD | Demolish and Re-build Existing Drop Conr | LS | 1 | $3,500.00 |
| TOTAL AMOUNT BID WITH ADD ITEM | $314,898.00 | ||||
| 10% BID BOND SUBMITTED? | Yes |
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 15, 2012
To: Municipal Authority
From: Mark Miller
Re: January Monthly Report
Meters: Meters have been re-calibrated due to some problems we had with the transducer brackets. The meter at Reservoir Road was reading high, upon further investigation we found that the bracket bolts had broken. Repairs were made and the meter was put back into operation.
C.C. Collection: The pumping stations were visited on a daily basis, baskets were cleaned, and pumps were checked. Aqua was utilized to clean the wet wells at the beginning of the month. The dialers at Ashbridge and Barkway Stations were replaced. We were notified of four sewer lateral blockages during the month; two required us to dig. We found that both were full of tree roots. The trees were also removed due to the over excavation making the trees unsafe. Pictures attached.
R.C. Collection: The pumping station was visited on a daily basis. We are currently doing a demonstration on grease removal at the Hunt Country pumping station. The Prodex Company offered a 30 day demonstration, I asked for a 60 day demonstration. Attached to your packet is an information sheet on the product.
F:\Data\Shared Data\Public Works Dept\Monthly Reports\2012 Municipal\January 2012 monthly Report for Municipal Authority, dated Feb. 15.docx
Plants: Ridley Creek is still struggling with the effluent quality. Attached is a violation notice from the DEP. The grinder at the Lochwood Plant dropped a bearing on the shaft unit; the unit was pulled and taken to Deckmens Electric.
Alarms: We received 20 alarms for the month of January.
PA One Calls: The Public Works Dept. responded to 75 PA One Calls.
F:\Data\Shared Data\Public Works Dept\Monthly Reports\2012 Municipal\January 2012 monthly Report for Municipal Authority, dated Feb. 15.docx
[Handwritten in margin: 709 Sycamore Dr]
[Photograph showing two workers in high-visibility safety jackets working inside an excavated trench assembling and connecting white PVC sewer pipe fittings and cleanouts.]
Old Trap 709 Sycamore Dr
Photograph of an excavated old sewer pipe trap surrounded by dirt next to a street curb and a blue utility marking flag.
709 Sycamore
Photograph of a yellow excavator arm and bucket digging inside an excavated trench beside an exposed vertical pipe capped with a white fitting, with shovels standing in the snow along the edge.
706 Red Maple Dr
Overhead photograph looking down into a deep excavated trench with exposed tree roots and a red extension ladder, showing two workers at the bottom of the pit.
706 Red Maple Dr.
Close-up overhead photograph of two workers at the bottom of a deep excavated trench beside a red ladder, fitting a white PVC coupling onto an underground pipe.
[Handwritten in margin: 706 Red Maple]
[Photograph looking down into the excavation trench where workers are using loppers to cut away thick tree roots interfering with an exposed pipe.]
706 Red Maple
Overhead photograph looking down into a deep excavated trench with exposed tree roots and a red extension ladder, showing two workers working at the bottom of the pit.
706 Red Maple
Overhead photograph looking down into a deep excavated trench with exposed tree roots and utility conduits, showing a worker in high-visibility gear operating a tool attached to a yellow hose.
EGMA 1200
[Logo: Pennoni]
MEMORANDUM
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Daniel Barbato, P.E. Authority Engineer |
| DATE: | February 16, 2012 |
| SUBJECT: | Engineer’s Report |
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Dan Barbato met with Mark Miller, Rick Smith, and Scott Towler to examine solids deposits at the plant outfall and to discuss the current operation of the plant by Miller Environmental. We reviewed the brief report by Miller dated February 3 and provided comments to Rick Smith. We also reviewed the NOV regarding the solids deposition and provided our opinion.
I/I Metering Project
- No change in status since the last report. The Township continues to meter flows at selected locations. Temporary meters are in operation at locations as recommended. Upon receipt of tributary connection data from the Township, Pennoni will review permanent meter data (particularly in the Chester Creek Service Area), make recommendations for 2012 temporary metering, and identify potential I&I problem areas.
Ridley Creek Consent Order
- The final report is due in March of 2012. Reports after this date will continue but will be for internal Authority use only. Work on the report will proceed in late February with receipt of meter and rainfall data from the Authority.
LCSTP Elimination
- We have provided bid assistance throughout the solicitation period including conducting a pre-bid meeting with prospective bidders, responding to bidders’ questions, analysis of rock drilling data and estimation of rock quantity, preparation of three addenda, assistance with bid opening on the PennBID website, preparation of a bid tabulation and award recommendation, and review of low bidder qualifications/references.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-02-16.docx
EGMA 1200
- Bids were received on February 15, 2012. The apparent low bidder is SJM Construction Company, Inc. of Spring House, PA with a total bid (including the Add Item) of $178,179.20.
- Based upon an award by the Authority on February 20, 2012, we estimate the construction schedule as follows: Award = 2/20/12 Receipt of Contractor Bonding and Insurance (10 days) = 3/1/12 Notice to Proceed = approx 3/5/12 Construction (120 days) = approx 3/5/12 – 7/2/12
Hershey Mill PS Diversion, Reserve PS Elimination Planning
- In early November, survey stakeout was performed for preliminary sewer alignments, followed by a field recon to evaluate the alignments. We forwarded recommended adjustments to the Township. We have received comments and responses from the Township, and we have begun to finalize plans and assemble permitting applications.
Marydell PS Elimination Planning
- In early November, preliminary field stakeout of the sewer was completed, and we forwarded recommendations for adjustments to the Township for consideration. We have received comments and responses from the Township, and we have begun to finalize plans and assemble permitting applications.
Applebrook Spray Irrigation NPDES Permit Renewal
- The NPDES discharge permit was submitted to DEP on June 15. DEP sent a letter confirming that the application is administratively complete and is undergoing technical review. We have called DEP several times over the past several months for a status update but have not received a return call.
Annual Chapter 94 Reports
- The annual updates to the Chapter 94 report are in progress. Reports are due by the end of March. Similar to last year, we will schedule a meeting with the Township to review developments and changes over the past year.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-02-16.docx
Miller Environmental Inc.
The Water and Wastewater Authority
320 S. 17th Street
Reading, PA 19602-2209
Telephone: (610) 376-9162
Facsimilie: (610) 376-9164
Email: info@miller-env.com
www.miller-env.com
02/09/2012
Mr. Rick Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
02/09/2012
Re: East Goshen Wastewater Treatment Plants- Lochwood & Ridley Creek
December, 2012 - Monthly Operation and Maintenance Report
Dear Mr. Smith:
Operations and Maintenance activities for the month of December, 2012
Routine Operation and Maintenance Activities
- Daily sampling, testing, and inspections for permit compliance.
- Routine daily testing for process optimization.
- Microscopic exams indicate filaments are reappearing.
- The Biomass is being watched closely due to excessive grease being introduced to the treatment process
- Cleaned grease from influent wet well daily
- Inspection of equipment in all phases of the treatment process
- Daily cleaning of muffin monster
- Clean out disc filters weekly
- Clean off DO probes and verify readings with hand held DO probe
- Wells at Lochwood were sampled for December
- Condensation blown out of air compressor
- Fire extinguishers were serviced/recharged
Non-Routine Operations and Maintenance Activities
- UV Banks being modified.
- Alum addition was ceased
- MLSS was transferred to equalize reactors
- DO probe #1 was taken off line and stored
- Auto dialer was changed for faster response time
- Influent sampler had heat blanket placed around tubing
- Centrifuge parts were installed
- Re-torqued auger bolts as per preventive maint. Schedule
- Worth repaired SBR blower #3
Items of concern
- UV parts have not been installed to date
- On December 28 th a storm surge had the process up to 226% of design with an average of 189%
- SBR blowers are not hitting the peak of 3ppm in SBR 4 and sometimes SBR 2
- Dialer is not calling out when the generator exercises or is called to run
- Polymer mixing chamber leaking unable to press
- There were 5 Ridley Creek violations on the DMR for December : TSS weekly avg. loading and concentration, Ammonia-Nitrogen monthly avg. loading and concentration and one instantaneous maximum fecal overage
- There was 1 Lochwood/Chase violation on the DMR for December : fecal coliform geometric mean
Items on schedule for January
- Sludge dewatering
- Continued monitoring of filaments in reactors due to grease and possible solutions
- Extensive attention to bringing ammonia, suspended solids and fecal back into compliance
- Meeting with township and its consultants to improve effluent quality
- Influent flow meter installation
Summary of November Influent Flow- Ridley
- Average flow .453 MGD
- Maximum daily flow 0.694 MGD
Summary of November Discharge- LOCHWOOD
– AVERAGE: .000151
Thank you,
MILLER ENVIRONMENTAL INC.
[SENT VIA EMAIL]
Richard S. Harp Sr.
Operations Manager
CC: Mark Miller, Director of Public Works
Dean Miller, MEI
File
file:///C:/DOCUME~1/Manager/LOCALS~1/Temp/RequirementForm-2.html
Pennsylvania Department of Environment Protection Discharge Monitoring Report (DMR)
FACILITY: LOCHWOOD CHASE STP & SPRAY SYS
PERMIT NUMBER: 1580430
REGION: EP SE Rgnl Off
PERMITTEE: EAST GOSHEN TWP MUNI AUTH CHESTER CNTY
OUTFALL: 001
COUNTY: Chester
CITY: WEST CHESTER
ADDRESS: 1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
MONITORING PERIOD: From: 2011-12-01 To: 2011-12-31
NO DISCHARGE FROM SITE: ( )
| Parameter | Quantity or Loading | Quality or Concentration | Frequency | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Value | Value | Units | Value | Value | Value | Units | No. Ex. | Frequency of Analysis | Sample Type | ||
| pH Parameter Code: 00400 Stage Code: 1 |
Sample Measurement | ***** | ***** | 7.48 | ***** | 7.48 | S.U. | 0 | 1/month | Grab | |
| Permit Requirement | ***** | ***** | 6.0 Minimum | ***** | 9.0 Maximum | 1/month | Grab | ||||
| Total Suspended Solids Parameter Code: 00530 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | 12 | 12 | mg/L | 0 | 1/month | Grab | |
| Permit Requirement | ***** | ***** | ***** | 30 Average Monthly | 45 Weekly Average | 1/month | Grab | ||||
| Total Nitrogen Parameter Code: 00600 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | 16.4 | 16.4 | mg/L | 0 | 1/month | Grab | |
| Permit Requirement | ***** | ***** | ***** | Report Average Monthly | Report Instantaneous Maximum | 1/month | Grab | ||||
| Flow (mgd) Parameter Code: 50050 Stage Code: G |
Sample Measurement | 0.000151 | ***** | MGD | ***** | ***** | ***** | 0 | Continuous | Recorded | |
| Permit Requirement | 0.0252 Average Monthly | ***** | ***** | ***** | ***** | Continuous | Recorded | ||||
| Fecal Coliform Parameter Code: 74055 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | 400 | ***** | CFU/100 mL | 1 | 1/month | Grab | |
| Permit Requirement | ***** | ***** | ***** | 200 Geometric Mean | ***** | 1/month | Grab | ||||
| CBOD5 Parameter Code: 80082 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | 24 | 24 | mg/L | 0 | 1/month | Grab | |
| Permit Requirement | ***** | ***** | ***** | 25 Average Monthly | 40 Weekly Average | 1/month | Grab | ||||
Name/Title of Principal Executive Officer Or Authorized Agent: I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Signature of Principal Executive Officer Or Authorized Agent:
Telephone No:
Date:
Report all violations during the reporting period on a Non-Compliance Reporting Form, as an attachment to your eDMR submission.
Page 1
1 of 2
1/24/2012 1:59 PM
pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION
3800-FM-WSFR0435 7/2009
SUPPLEMENTAL REPORT
DAILY EFFLUENT MONITORING
Facility Name: Lochwood chase WWTP and Spray
Municipality: East Goshen Township
County: Chester
Watershed:
Laboratories: Atlantic Coast Labs
Month: 12 (select number)
Year: 2011
Permit No.: 1580430-A1
Outfall:
Renewal application due 180 days prior to expiration.
This permit will expire on: December 31, 2015
| Parameter | Flow | CBOD5 | TSS | pH | Fecal Coliform | Total Nitrogen | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Stage | 1 | ||||||||||||
| Week | Day | Date | MGD | Q | mg/L | Q | mg/L | Q | S.U. | Q | mg/L | Q | mg/L |
| Thu | 12/1/11 | 0.0 | |||||||||||
| Fri | 12/2/11 | 0.0 | |||||||||||
| Sat | 12/3/11 | 0.0 | |||||||||||
| 1 | Sun | 12/4/11 | 0.0 | ||||||||||
| Mon | 12/5/11 | 0.0 | |||||||||||
| Tue | 12/6/11 | 0.00002 | |||||||||||
| Wed | 12/7/11 | 0.0 | 24.0 | 12.2 | 7.48 | 400.0 | 16.4 | ||||||
| Thu | 12/8/11 | 0.0 | |||||||||||
| Fri | 12/9/11 | 0.0003 | |||||||||||
| Sat | 12/10/11 | 0.00039 | |||||||||||
| 2 | Sun | 12/11/11 | 0.00038 | ||||||||||
| Mon | 12/12/11 | 0.0 | |||||||||||
| Tue | 12/13/11 | 0.0 | |||||||||||
| Wed | 12/14/11 | 0.00037 | |||||||||||
| Thu | 12/15/11 | 0.00037 | |||||||||||
| Fri | 12/16/11 | 0.00037 | |||||||||||
| Sat | 12/17/11 | 0.00038 | |||||||||||
| 3 | Sun | 12/18/11 | 0.00036 | ||||||||||
| Mon | 12/19/11 | 0.00038 | |||||||||||
| Tue | 12/20/11 | 0.00037 | |||||||||||
| Wed | 12/21/11 | 0.00037 | |||||||||||
| Thu | 12/22/11 | 0.0 | |||||||||||
| Fri | 12/23/11 | 0.0 | |||||||||||
| Sat | 12/24/11 | 0.0 | |||||||||||
| 4 | Sun | 12/25/11 | 0.00036 | ||||||||||
| Mon | 12/26/11 | 0.00029 | |||||||||||
| Tue | 12/27/11 | 0.0 | |||||||||||
| Wed | 12/28/11 | 0.0 | |||||||||||
| Thu | 12/29/11 | 0.0 | |||||||||||
| Fri | 12/30/11 | 0.0 | |||||||||||
| Sat | 12/31/11 | 0.0 | |||||||||||
| 5 | |||||||||||||
| Statistical for DMR | |||||||||||||
| Daily Minimum (Conc.): | 24 | 12.2 | 7.48 | 400 | 16.4 | ||||||||
| Daily Maximum (Conc.): | 24 | 12.2 | 7.48 | 400 | 16.4 | ||||||||
| Max Avg Weekly (Conc.): | 24 | 12.2 | 400 | 16.4 | |||||||||
| Avg Monthly (Conc.): | 24 | 12 | 400 | 16.4 | |||||||||
| Geometric Mean (Conc.): | |||||||||||||
| Max Avg Weekly (Load): | 0.000265 | ||||||||||||
| Avg Monthly (Load): | 0.000151 | ||||||||||||
| Total Monthly (Load): | 0.004685 | ||||||||||||
| Daily Minimum (Load): | 0 | ||||||||||||
| Daily Maximum (Load): | 0.000394 | ||||||||||||
I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Prepared By: Rick Harp
Title: Operations Manager
License No.: T2955
Date: 1/28/2012
3800-FM-WSFR0443 7/2009
pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SUPPLEMENTAL REPORT
GROUNDWATER MONITORING DATA REPORT
Facility Name: Lochwood Chase WWTP and Spray
Municipality: East Goshen Township
County: West chester
Watershed:
Monitoring Period: December
Year: 2011
Permit No.: 1580430-A1
Monitoring Well No.: 2
FIELD ANALYSIS
| Top of Casing Elevation (ft) | 1.5' | Well Diameter (ft) | 6" | Temperature (°C) | 20 |
|---|---|---|---|---|---|
| Initial Depth to Water (ft) | 3'2" | Total Well Depth (ft) | 10' | pH (SU) | 5.69 |
| Volume of Water in Well (gal) | #VALUE! | Total Vol Purged (gal) | 25.0 | Conductivity (µmhos/cm) |
LAB ANALYSIS
| Sample Date | Parameter | Q | Result | Units | Lab Reporting Limit | Units |
|---|---|---|---|---|---|---|
| 12/14/2011 | Fecal Coliform | < | 2 | mg/l | mg/l | |
| 12/14/2011 | Total Nitrogen | < | 0.2 | mg/l | 0.2 | mg/l |
I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Prepared By: Rick Harp
Title: Operations Supervisor
License No.: T2955
Date: 1/24/2012
file:///C:/DOCUME~1/Manager/LOCALS~1/Temp/RequirementForm-3.html
Pennsylvania Department of Environment Protection Discharge Monitoring Report (DMR)
FACILITY: RIDLEY CREEK STP
PERMIT NUMBER: PA0050504
REGION: EP SE Rgnl Off
PERMITTEE: EAST GOSHEN TWP MUNI AUTH CHESTER CNTY
OUTFALL: 001
COUNTY: Chester
CITY: WEST CHESTER
ADDRESS: 1751 TOWNE DR
WEST CHESTER, PA 19380
MONITORING PERIOD: From: 2011-12-01 To: 2011-12-31
NO DISCHARGE FROM SITE: ( )
| Parameter | Quantity or Loading | Quality or Concentration | Frequency | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Value | Value | Units | Value | Value | Value | Units | No. Ex. | Frequency of Analysis | Sample Type | ||
| Dissolved Oxygen Parameter Code: 00300 Stage Code: 1 |
Sample Measurement | ***** | ***** | 6.8 | 8.7 | ***** | mg/L | 0 | 1/day | Grab | |
| Permit Requirement | ***** | ***** | 5.0 Instantaneous Minimum | Report Average Monthly | ***** | 1/day | Grab | ||||
| pH Parameter Code: 00400 Stage Code: 1 |
Sample Measurement | ***** | ***** | 6.6 | ***** | 8.3 | S.U. | 0 | 1/day | Grab | |
| Permit Requirement | ***** | ***** | 6.0 Instantaneous Minimum | ***** | 9.0 Instantaneous Maximum | 1/day | Grab | ||||
| Total Suspended Solids Parameter Code: 00530 Stage Code: 1 |
Sample Measurement | 67 | 211 | lbs/day | ***** | 16 | 53 | mg/L | 2 | 1/week | 24-Hr Composite |
| Permit Requirement | 100 Average Monthly | 150 Weekly Average | ***** | 30 Average Monthly | 45 Weekly Average | 1/week | 24-Hr Composite | ||||
| Ammonia-Nitrogen Parameter Code: 00610 Stage Code: 1 |
Sample Measurement | 61 | ***** | lbs/day | ***** | 15 | ***** | mg/L | 2 | 1/week | 24-Hr Composite |
| Permit Requirement | 40 Average Monthly | ***** | ***** | 12 Average Monthly | ***** | 1/week | 24-Hr Composite | ||||
| Flow (mgd) Parameter Code: 50050 Stage Code: 1 |
Sample Measurement | 0.453 | 0.694 | MGD | ***** | ***** | ***** | 0 | Continuous | Metered | |
| Permit Requirement | Report Average Monthly | Report Daily Maximum | ***** | ***** | ***** | Continuous | Metered | ||||
| Fecal Coliform Parameter Code: 74055 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | <37 | 1900 | CFU/100 mL | 1 | 1/week | Grab | |
| Permit Requirement | ***** | ***** | ***** | 200 Geometric Mean | 1000 Instantaneous Maximum | 1/week | Grab | ||||
| CBOD5 Parameter Code: 80082 Stage Code: 1 |
Sample Measurement | 23 | 48 | lbs/day | ***** | 6 | 12 | mg/L | 0 | 1/week | 24-Hr Composite |
| Permit Requirement | 67 Average Monthly | 100 Weekly Average | ***** | 20 Average Monthly | 30 Weekly Average | 1/week | 24-Hr Composite | ||||
Name/Title of Principal Executive Officer Or Authorized Agent: I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Signature of Principal Executive Officer Or Authorized Agent:
Telephone No:
Date:
Report all violations during the reporting period on a Non-Compliance Reporting Form, as an attachment to your eDMR submission.
Page 1
1 of 3
1/24/2012 2:18 PM
file:///C:/DOCUME~1/Manager/LOCALS~1/Temp/RequirementForm-3.html
Pennsylvania Department of Environment Protection Discharge Monitoring Report (DMR)
FACILITY: RIDLEY CREEK STP
PERMIT NUMBER: PA0050504
REGION: EP SE Rgnl Off
PERMITTEE: EAST GOSHEN TWP MUNI AUTH CHESTER CNTY
OUTFALL: 002
COUNTY: Chester
CITY: WEST CHESTER
ADDRESS: 1751 TOWNE DR
WEST CHESTER, PA 19380
MONITORING PERIOD: From: 2011-12-01 To: 2011-12-31
NO DISCHARGE FROM SITE: ( X )
| Parameter | Quantity or Loading | Quality or Concentration | Frequency | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Value | Value | Units | Value | Value | Value | Units | No. Ex. | Frequency of Analysis | Sample Type | ||
| Dissolved Oxygen Parameter Code: 00300 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | ***** | ***** | mg/L | ||||
| Permit Requirement | ***** | ***** | 5.0 Instantaneous Minimum | Report Average Monthly | ***** | 1/day | Grab | ||||
| pH Parameter Code: 00400 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | ***** | ***** | S.U. | ||||
| Permit Requirement | ***** | ***** | 6.0 Instantaneous Minimum | ***** | 9.0 Instantaneous Maximum | 1/day | Grab | ||||
| Total Suspended Solids Parameter Code: 00530 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | ***** | ***** | mg/L | ||||
| Permit Requirement | ***** | ***** | ***** | 30 Average Monthly | 45 Weekly Average | 1/week | Composite | ||||
| Ammonia-Nitrogen Parameter Code: 00610 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | ***** | ***** | mg/L | ||||
| Permit Requirement | ***** | ***** | ***** | 12.0 Average Monthly | ***** | 1/week | 24-Hr Composite | ||||
| Flow (mgd) Parameter Code: 50050 Stage Code: 1 |
Sample Measurement | ***** | ***** | MGD | ***** | ***** | ***** | ||||
| Permit Requirement | Report Average Monthly | Report Daily Maximum | ***** | ***** | ***** | Continuous | Metered | ||||
| Fecal Coliform Parameter Code: 74055 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | ***** | ***** | CFU/100 mL | ||||
| Permit Requirement | ***** | ***** | ***** | 200 Geometric Mean | ***** | 1/week | Grab | ||||
| CBOD5 Parameter Code: 80082 Stage Code: 1 |
Sample Measurement | ***** | ***** | ***** | ***** | ***** | mg/L | ||||
| Permit Requirement | ***** | ***** | ***** | 20 Average Monthly | 30 Weekly Average | 1/week | 24-Hr Composite | ||||
Name/Title of Principal Executive Officer Or Authorized Agent: I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Signature of Principal Executive Officer Or Authorized Agent:
Telephone No:
Date:
Report all violations during the reporting period on a Non-Compliance Reporting Form, as an attachment to your eDMR submission.
Page 2
2 of 3
1/24/2012 2:18 PM
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
3800-FM-WSFR0435 7/2009
pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF WATER STANDARDS AND FACILITY REGULATION
SUPPLEMENTAL REPORT
DAILY EFFLUENT MONITORING
Facility Name: Ridley Creek STP
Municipality: East Goshen Township
Watershed: 3G
Laboratories: Atlantic Coast Labs, Inc. (68-335)
County: Chester
Month: 12 (2-digit number)
Year: 2011
Permit No.: PA 0050504
Outfall: 001
Renewal application due 180 days prior to expiration.
This permit will expire on:
| Week | Day | Date | Flow (Stage 1, MGD) | Q | Fecal Coliform (Stage 1, CFU/100 ml) | Q | Dissolved Oxygen (Stage 1, mg/L) | Q | pH (Stage 1, S.U.) | Q | TSS (Stage 1, mg/L) | Q | NH3-N (Stage 1, mg/L) | Q | CBOD5 (Stage 1, mg/L) | Q | Total Phosphorus (Stage 1, mg/L) | Q | Total Nitrogen (Stage 1, mg/L) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Thu | 12/01/11 | 0.367 | 7.75 | 7.51 | ||||||||||||||
| 1 | Fri | 12/02/11 | 0.28 | 8.25 | 7.4 | ||||||||||||||
| 1 | Sat | 12/03/11 | 0.485 | 8.08 | 7.3 | ||||||||||||||
| 1 | Sun | 12/04/11 | 0.501 | 8.6 | 7.31 | ||||||||||||||
| 1 | Mon | 12/05/11 | 0.478 | 8.54 | 7.28 | ||||||||||||||
| 1 | Tue | 12/06/11 | 0.391 | 8.69 | 7.38 | ||||||||||||||
| 1 | Wed | 12/07/11 | 0.684 | < | 10.0 | 7.87 | 6.8 | 8.0 | 15.1 | < | 3.0 | 0.15 | |||||||
| 2 | Thu | 12/08/11 | 0.591 | 8.56 | 7.42 | ||||||||||||||
| 2 | Fri | 12/09/11 | 0.408 | 8.56 | 7.38 | ||||||||||||||
| 2 | Sat | 12/10/11 | 0.48 | 9.39 | 7.43 | ||||||||||||||
| 2 | Sun | 12/11/11 | 0.462 | 9.13 | 7.51 | ||||||||||||||
| 2 | Mon | 12/12/11 | 0.385 | 9.89 | 7.63 | ||||||||||||||
| 2 | Tue | 12/13/11 | 0.429 | 9.14 | 7.57 | ||||||||||||||
| 2 | Wed | 12/14/11 | 0.41 | < | 10.0 | 8.80 | 7.56 | < | 4.0 | 16.1 | 6.0 | 0.16 | |||||||
| 3 | Thu | 12/15/11 | 0.386 | 6.33 | 7.63 | ||||||||||||||
| 3 | Fri | 12/16/11 | 0.438 | 8.6 | 7.62 | ||||||||||||||
| 3 | Sat | 12/17/11 | 0.447 | 8.61 | 7.27 | ||||||||||||||
| 3 | Sun | 12/18/11 | 0.464 | 7.65 | 7.71 | ||||||||||||||
| 3 | Mon | 12/19/11 | 0.434 | 8.2 | 7.67 | ||||||||||||||
| 3 | Tue | 12/20/11 | 0.414 | 9.0 | 7.54 | ||||||||||||||
| 3 | Wed | 12/21/11 | 0.421 | < | 10.0 | 9.42 | 8.25 | 5.0 | 21.8 | 5.0 | 0.13 | ||||||||
| 4 | Thu | 12/22/11 | 0.413 | 8.31 | 7.65 | ||||||||||||||
| 4 | Fri | 12/23/11 | 0.5 | 8.41 | 7.72 | ||||||||||||||
| 4 | Sat | 12/24/11 | 0.546 | 9.3 | 7.63 | ||||||||||||||
| 4 | Sun | 12/25/11 | 0.454 | 8.4 | 7.36 | ||||||||||||||
| 4 | Mon | 12/26/11 | 0.437 | 8.16 | 7.47 | ||||||||||||||
| 4 | Tue | 12/27/11 | 0.579 | 7.47 | 7.63 | ||||||||||||||
| 4 | Wed | 12/28/11 | 0.419 | 1900.0 | 8.39 | 7.35 | 52.7 | 6.82 | 12.0 | 0.52 | |||||||||
| 5 | Thu | 12/29/11 | 0.449 | 8.67 | 7.54 | ||||||||||||||
| 5 | Fri | 12/30/11 | 0.408 | 8.62 | 7.62 | ||||||||||||||
| 5 | Sat | 12/31/11 | 0.485 | 6.77 | 7.55 | ||||||||||||||
| SUMMARY DATA | |||||||||||||||||||
| Daily Minimum (Conc.): | < | 10 | 6.77 | 6.8 | < | 4 | 6.82 | < | 3 | 0.13 | |||||||||
| Daily Maximum (Conc.): | 1900 | 10.7 | 8.25 | 52.7 | 21.8 | 12 | 0.52 | ||||||||||||
| Max Avg Weekly (Conc.): | 9.09 | 52.7 | 21.8 | 12 | 0.52 | ||||||||||||||
| Avg Monthly (Conc.): | 8.71 | 16 | 15 | 8 | 0.24 | ||||||||||||||
| Geometric Mean (Conc.): | < | 37 | |||||||||||||||||
| Max Avg Weekly (Load): | 0.507 | 38 | 216.5 | 87.4 | 48 | 2.1 | |||||||||||||
| Avg Monthly (Load): | 0.450 | 22.9 | 67.2 | 60.65 | 23 | 1 | |||||||||||||
| Total Monthly (Load): | 14.059 | 1026.4 | < | 2083.3 | 1880.17 | 727 | 30.4 | ||||||||||||
| Daily Minimum (Load): | 0.280 | 19.22 | < | 16.4 | 30.74 | 17 | 0.43 | ||||||||||||
| Daily Maximum (Load): | 0.684 | 47.55 | 216.5 | 87.4 | 48 | 2.08 | |||||||||||||
I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Prepared By: Rick Harp
Title: Operations Manager
License No.: T2555
Date: 27-Dec-11
2012 FLOWMETERS
2012 JANUARY 1ST QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY GPD | ELLIS LANE READING | ELLIS LANE GPD | PAOLI PIKE READING | PAOLI PIKE GPD | WILSON DRIVE READING | WILSON DRIVE GPD | SUMMIT FLOWS | NET |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.08 | 01/01/12 | 20,400 | 0 | ||||||||
| 0 | 01/02/12 | 20,400 | 0 | ||||||||
| 0 | 01/03/12 | 2,379,520 | 1,260,000 | 22,356,269 | 159,023 | 11,465,462 | 63,505 | 13,007,557 | 42,183 | 20,400 | 995,290 |
| 0 | 01/04/12 | 2,380,803 | 1,283,000 | 22,371,133 | 148,640 | 11,472,683 | 72,210 | 13,014,333 | 67,760 | 20,400 | 994,390 |
| 0 | 01/05/12 | 2,382,069 | 1,266,000 | 22,385,451 | 143,180 | 11,479,513 | 68,300 | 13,021,180 | 68,470 | 20,400 | 986,050 |
| 0 | 01/06/12 | 2,383,310 | 1,241,000 | 22,399,296 | 138,450 | 11,486,835 | 73,220 | 13,027,897 | 67,170 | 20,400 | 962,160 |
| 0 | 01/07/12 | 20,400 | 0 | ||||||||
| 0 | 01/08/12 | 20,400 | 0 | ||||||||
| 0 | 01/09/12 | 2,386,903 | 1,197,667 | 22,440,301 | 136,683 | 11,505,380 | 61,817 | 13,042,431 | 48,447 | 20,400 | 950,720 |
| 0 | 01/10/12 | 2,388,102 | 1,199,000 | 22,453,127 | 128,260 | 11,511,972 | 65,920 | 13,049,654 | 72,230 | 20,400 | 932,590 |
| 0.62 | 01/11/12 | 2,389,297 | 1,195,000 | 22,465,677 | 125,500 | 11,518,964 | 69,920 | 13,056,753 | 70,990 | 20,400 | 928,590 |
| 0.59 | 01/12/12 | 2,390,687 | 1,390,000 | 22,482,939 | 172,620 | 11,526,768 | 78,040 | 13,065,106 | 83,530 | 20,400 | 1,055,810 |
| 0 | 01/13/12 | 2,392,294 | 1,607,000 | 22,503,776 | 208,370 | 11,533,385 | 66,170 | 13,073,143 | 80,370 | 20,400 | 1,252,090 |
| 0 | 01/14/12 | 20,400 | 0 | ||||||||
| 0 | 01/15/12 | 20,400 | 0 | ||||||||
| 0.1 | 01/16/12 | 20,400 | 0 | ||||||||
| 0.25 | 01/17/12 | 2,397,426 | 1,283,000 | 22,563,402 | 149,065 | 11,559,807 | 66,055 | 13,096,878 | 59,338 | 20,400 | 1,008,543 |
| 0 | 01/18/12 | 2,398,730 | 1,304,000 | 22,579,131 | 157,290 | 11,567,088 | 72,810 | 13,104,925 | 80,470 | 20,400 | 993,430 |
| 0 | 01/19/12 | 2,400,009 | 1,279,000 | 22,593,522 | 143,910 | 11,574,091 | 70,030 | 13,112,800 | 78,750 | 20,400 | 986,310 |
| 0 | 01/20/12 | 2,401,254 | 1,245,000 | 22,607,222 | 137,000 | 11,580,657 | 65,660 | 13,120,398 | 75,980 | 20,400 | 966,360 |
| 0.1 | 01/21/12 | 20,400 | 0 | ||||||||
| 0 | 01/22/12 | 20,400 | 0 | ||||||||
| 0.28 | 01/23/12 | 2,404,922 | 1,222,667 | 22,648,414 | 137,307 | 11,599,131 | 61,580 | 13,137,228 | 56,100 | 20,400 | 967,680 |
| 0 | 01/24/12 | 2,406,376 | 1,454,000 | 22,666,530 | 181,160 | 11,607,861 | 87,300 | 13,145,281 | 80,530 | 20,400 | 1,105,010 |
| 0.02 | 01/25/12 | 2,407,725 | 1,349,000 | 22,682,537 | 160,070 | 11,615,839 | 79,780 | 13,152,921 | 76,400 | 20,400 | 1,032,750 |
| 0.05 | 01/26/12 | 2,409,049 | 1,324,000 | 22,698,875 | 163,380 | 11,624,511 | 86,720 | 13,162,827 | 99,060 | 20,400 | 974,840 |
| 0.28 | 01/27/12 | 2,410,301 | 1,252,000 | 22,713,102 | 142,270 | 11,630,022 | 55,110 | 13,167,943 | 51,160 | 20,400 | 1,003,460 |
| 0 | 01/28/12 | 20,400 | 0 | ||||||||
| 0 | 01/29/12 | 20,400 | 0 | ||||||||
| 0 | 01/30/12 | 2,414,232 | 1,310,333 | 22,763,147 | 166,817 | 11,649,409 | 64,623 | 13,186,537 | 61,980 | 20,400 | 1,016,913 |
| 0 | 01/31/12 | 2,415,499 | 1,267,000 | 22,778,417 | 152,700 | 11,655,990 | 65,810 | 13,193,325 | 67,880 | 20,400 | 980,610 |
| 2.37 | 1,296,433 | 152,585 | 69,729 | 69,440 | 1,004,680 | ||||||
| DAILY LOC | INQUIRER | EG TWP | |||||||||
| MONTH TO DATE | 2.37 | ||||||||||
| NORMAL MONTH TO DATE | |||||||||||
| YEAR TO DATE | 2.37 | ||||||||||
| NORMAL YEAR TO DATE |
2012 FLOWMETERS
2012 JANUARY - CC COLLECTION - METERS FROM WEST GOSHEN
| DATE | HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | SHERMAN | BARKWAY | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | |
| 1/1/2012 | ||||||||||||
| 1/2/2012 | ||||||||||||
| 1/3/2012 | 142,757,666 | 808,805 | ||||||||||
| 1/4/2012 | 142,842,585 | 849,190 | ||||||||||
| 1/5/2012 | 22,646,154 | 73,117 | 1,331,916 | 93,429 | 142,926,276 | 836,910 | 722,051 | 7,087 | 2,268,552 | 13,449 | ||
| 1/6/2012 | 143,008,791 | 825,150 | ||||||||||
| 1/7/2012 | ||||||||||||
| 1/8/2012 | ||||||||||||
| 1/9/2012 | 143,241,544 | 775,843 | ||||||||||
| 1/10/2012 | 143,322,907 | 813,630 | ||||||||||
| 1/11/2012 | 143,404,982 | 820,750 | ||||||||||
| 1/12/2012 | 22,695,667 | 70,733 | 1,337,747 | 83,300 | 143,500,809 | 958,270 | 727,177 | 7,323 | 2,277,066 | 12,163 | ||
| 1/13/2012 | 143,609,781 | 1,089,720 | ||||||||||
| 1/14/2012 | ||||||||||||
| 1/15/2012 | ||||||||||||
| 1/16/2012 | ||||||||||||
| 1/17/2012 | 143,964,518 | 886,843 | ||||||||||
| 1/18/2012 | 144,057,878 | 933,600 | ||||||||||
| 1/19/2012 | 22,747,400 | 73,904 | 1,344,370 | 94,614 | 144,149,233 | 913,550 | 731,973 | 6,851 | 2,285,596 | 12,186 | ||
| 1/20/2012 | 144,237,635 | 884,020 | ||||||||||
| 1/21/2012 | ||||||||||||
| 1/22/2012 | ||||||||||||
| 1/23/2012 | 144,496,084 | 861,497 | ||||||||||
| 1/24/2012 | 22,784,149 | 73,498 | 1,348,754 | 87,680 | 144,603,537 | 1,074,530 | 735,197 | 6,448 | 2,292,054 | 12,916 | ||
| 1/25/2012 | 144,703,947 | 1,004,100 | ||||||||||
| 1/26/2012 | 22,798,985 | 74,180 | 1,350,596 | 92,100 | 2,864,207 | 135,088 | 144,810,811 | 1,068,640 | 736,577 | 6,900 | 2,294,238 | 10,920 |
| 1/27/2012 | 2,891,285 | 270,780 | 144,898,035 | 872,240 | ||||||||
| 1/28/2012 | ||||||||||||
| 1/29/2012 | ||||||||||||
| 1/30/2012 | 145,186,452 | 961,390 | ||||||||||
| 1/31/2012 | 145,281,228 | 947,760 | ||||||||||
| 73,086 | 90,225 | 67,846 | 909,322 | 6,922 | 12,327 | |||||||
2012 SUMMARY OF METER READINGS
| Month | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,296,433 | 152,585 | 69,729 | 69,440 | 20,400 | 73,086 | 90,225 | 67,846 | 909,322 | 6,922 | 12,327 |
| FEBRUARY | |||||||||||
| MARCH | |||||||||||
| APRIL | |||||||||||
| MAY | |||||||||||
| JUNE | |||||||||||
| JULY | |||||||||||
| AUGUST | |||||||||||
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,296,433 | 152,585 | 69,729 | 69,440 | 20,400 | 73,086 | 90,225 | 67,846 | 909,322 | 6,922 | 12,327 |
To West Goshen 1,004,679
2012 flowmeters -all-stations separate month worksheets;004.xlsSUMMARY
Flowmeters January 2012
Line chart plotting Flow's (0 to 1,400,000) on the vertical axis against Day of the Month (1 to 31) on the horizontal axis for the series January.
Labels and Legend: Flowmeters January 2012; Flow's (0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000); Day of the Month (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31); January.
Monthly Totals 2012 Jan-Dec
Bar chart plotting Flowmeters (0 to 1,400,000) on the vertical axis against Month (January through December) on the horizontal axis, showing daily flowmeter bars for January and empty entries for February through December.
Labels: Monthly Totals 2012 Jan-Dec; Flowmeters (0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000); Month (January, February, March, April, May, June, July, August, September, October, November, December).
January Precip. 2.37 - 2012
Bar chart plotting daily precipitation (precip., 0 to 8) on the vertical axis against day of the month (snow/rain, 1 to 32) on the horizontal axis for the series January.
Labels and Legend: January Precip. 2.37 - 2012; precip. (0, 1, 2, 3, 4, 5, 6, 7, 8); snow/rain (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32); January.
2012 Monthly Precipitation
Bar chart plotting monthly precipitation (0 to 2.5) on the vertical axis against months (January through December) on the horizontal axis for Series1, showing a bar near 2.37 for January and 0 for February through December.
Labels and Legend: 2012 Monthly Precipitation; (0, 0.5, 1, 1.5, 2, 2.5); January, February, March, April, May, June, July, August, September, October, November, December; Series1.