The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

May 14, 2012
Monday 6:00 PM
The Meeting will start at 6:00 at the Ridley Creek Plant

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
  3. APPROVAL OF MINUTES April 9, 2012
  4. APPROVAL OF INVOICES Item Invoice Amount a. Pennoni #504741 $ 1,089.00 b. Pennoni #504742 $ 5,835.00 c. Pennoni #504744 $ 10,348.75 d. Pennoni #504746 $ 3,035.25 e. Gawthrop Greenwood #98012 $ 152.00 f. Gawthrop Greenwood #98989 $ 703.00
  5. LIAISON REPORTS
  6. FINANCIAL REPORTS Memo from Jon Altshul; RCSTP Budget
  7. OLD BUSINESS Clinger invoice response
  8. GOALS April Goals
  9. NEW BUSINESS
  10. CAPACITY REQUESTS - none
  11. SEWER REPORTS Director of Public Works Report; Pennoni Report – Inspection Report; Pennoni Engineer's Report; Big Fish Environmental Inc Report with DMR's; East Goshen Township Flows for April 2012
  12. ANY OTHER MATTER
  13. CORRESPONDENCE AND REPORTS OF INTEREST
  14. PUBLIC COMMENT
  15. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2012\5-11-2012 .doc

Meetings & Dates of Importance

Date Event / Meeting Time
May 3, 2012 Farmers Market 3-7 PM
May 9, 2012 Conservancy Board 7:00 PM
May 10, 2012 Historical Commission 7:00 PM
May 14, 2012 Municipal Auth. At the Plant 6:00PM
May 15, 2012 BOS 7:00 PM
May 21, 2012 Commerce Dev. Comm. 7:00 PM
May 23, 2012 Friends of EGT 7:00 PM
May 23, 2012 Zoning Hearing Board 7:30 PM
May 28, 2012 Offices Closed (Memorial Day)
June 2, 2012 Historical Comm. Civil War Event

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Website Posting Date
July 1, 2012 - Summer

F:\Data\Shared Data\Agendas\Municipal Authority\2012\5-11-2012 .doc

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 9, 2012

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, April 9, 2012 at 7:00pm at the East Goshen Township building. Members in attendance were: Chairman Dana Pizarro, Joe McCawley, Jack Yahraes, and Fran Beck. Also in attendance were: Rick Smith (Township Manager), Bob Adams, and Scott Towler.

Call to Order & Pledge of Allegiance

Dana called the meeting to order at 7:00pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Dana asked if anyone would be recording the meeting and there was no response.

Chairman's Report/Other Members' Reports

Jack attended the West Goshen Municipal Authority meeting and provided copies of the minutes.

Approval of Minutes

The Chairman noted that the minutes of the March 12, 2012 meeting were approved.

Approval of Invoices

Joe moved to approve payment of the following invoices:

Item Invoice Amount
a. Pennoni #501139, $1,366.00
b. Pennoni #501140, $ 472.50
c. Pennoni #501141, $1,422.00
d. Pennoni #501142 $1,210.00
e. Pennoni #501143 $ 442.75
f. Pennoni #501144 $3,319.00
g. Gawthrop #97574 $1,083.00

Fran seconded the motion. There was no further discussion. The motion passed unanimously.

Liaison Reports – None

Financial Reports –

The financial reports were reviewed. Fran voiced his concern about the current format of the report and his hope that the new CFO will provide monthly reports every month. He received a questionnaire from the auditors and hesitant to respond. Fran feels he does not have enough knowledge of the Authority's finances to answer. Rick explained how the accounting system works (cash vs accrual). Dana asked Rick to invite the new CFO to the next meeting.

Old Business - None

Goals

  1. Newsletter – Jack will prepare the article for the summer newsletter.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 04-09-12 draft.doc

  1. Joe will attend the June 6th West Goshen meeting and Dana will attend the September meeting.

New Business

None

Capacity Requests

None.

Sewer Reports

  1. Mark Miller, Director of Public Works Report: During the month of March, they were busy with lateral repairs and working with Scott Towler performing maintenance at the plant. Scott has done an excellent job turning the plant around. They met with Dan Ellis to discuss the final Chapter 94 report. They decided to continue with the metering of the sewer system. They are going to begin monitoring the Chester Creek system. During the meeting they discussed metering at the plant as they currently have a portable meter out in the wet lands. The reason for this meter is to get actual plant flow since the current meter is on the pump discharge side of the plant. Currently they are reading the backwash from the filters and centraite from the centrifuge. Mark recommends purchasing a permanent meter. He asked Allied Control to take a look at the manhole where we would like to install the meter and submit a quote. Aqua Waste Water had to be utilized to clean SBR#1 as there was over a foot of grit throughout the tank. Worth has been notified of some problems with the decanter in the SBR, plus they need to install some additional brackets on the pump glide system. Meters – Were read on a daily basis, no problems to report. In the next two weeks they will be relocating the portable meters. C.C. Collection – They had to excavate two sewer laterals due to root penetration. Once the laterals were excavated, a new trap and cleanout were installed. The pumping stations were visited on a daily basis where routine maintenance was performed. R.C. Collection – The Hunt Country pumping station was visited on a routine basis for basic maintenance. They are going to continue to use augmentation to break down the grease. Alarms – They received 18 alarms for the month; several were due to a tree that came down on Morstein Road causing a power outage at the Barkway Pumping Station. PA One Call – There were 35 PA One calls for the month of March. The Public Works Department was notified of 7 sewer lateral blockages for the month of March, all were cleared with the exception of the two that had to be dug.
  2. Pennoni inspection report was reviewed. This report of the Ridley Creek Sewage Treatment Plant was done in order to document existing conditions under Miller Environmental's operation of the plant.
  3. Dan Barbato provided the following report: Invoices - with summaries were provided under separate cover.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 04-09-12 draft.doc

Ridley Creek Sewage Treatment Plant –

  • Pennoni design engineer Tim Daily met with Scott Towler at the plant on March 23 to review current operations and clarify the intent of the design. Dan Barbato has been in contact with Scott Towler for coordination. The new NPDES permit went into effect on March 1. Phosphorous effluent limits are currently being met without the use of alum, and nitrogen effluents limits are being met. The centrifuge was under near-continuous operation and the solids inventory being reduced to acceptable levels and age. The interior of the SBR Unit #1 will be inspected by Matt McAloon on April 6, pending confirmation of available access by the operator. The plant is currently operating as intended by the design. Will inspect the plant again when the plant returns to a “normal” condition and make a comparison of current conditions to the conditions encountered under the previous operator.

I/I Metering Project

We analyzed flow data from the 11 permanent meters throughout the Chester Creek Service Area for the entirety of 2011. Instantaneous and hourly flows are not recorded on these meters, so we were only able to analyze the daily meter totalizer records. Only a rough flow analysis was performed since inflow peaks and continuous base flows are unknown. It appears the following two areas may have I/I problems based upon apparent excessive daily flows per tributary land area: 1) the southwest corner of East Goshen Township which is generally bounded by East Strasburg Road to the north, the reservoir to the east, and township borders to the south and west; (2) an area bounded by Paoli Pike to the north, North Chester Road to the east, East Strasburg Road to the south, and Ellis Lane to the west. We recommend the Township install four temporary meters in strategic locations within these subareas over the next six month to identify potential I/I sources.

Dana will email Dan with his questions about the flows and the meters.

Ridley Creek Consent Order

  • The final report was submitted to DEP on March 29, 2012. Reports after this date will continue to be prepared semi-annually but they will not be submitted to DEP semi-annually. They will be used for internal Authority use and Chapter 94 Annual Reporting only.

LCSTP Elimination

  • A pre-construction meeting was held with the Township, Pennoni, the contractor, SJM Construction Co, Inc, and the Chester County Conservation District (CCCD) on March 28, 2012. The contractor tentatively intends to start construction in mid-April and anticipates 30-60 days to complete the work. The required contract completion date is July 2, 2012
  • The contractor has provided construction submittals. We have reviewed the submittals, and we provided comments to the contractor. The contractor has also filled out the NPDES Co-Permittee Application and has forwarded it to the Township for signature and eventual submission to the CCCD.
  • We prepared a Construction Issue set of plans and specifications to incorporate the various addenda into one set of plans and specifications. We also prepared a CAD

F:\Data\Shared Data\Municipal Authority\2012\MA 04-09-12 draft.doc

Hershey Mill PS Diversion, Reserve PS Elimination Planning

  • We have prepared draft plans and draft applications for DEP General Permits (GP) for stream crossings. We are coordinating with DEP regarding permit requirements for PNDI, bog turtle screenings, and wetland delineations since all utility stream crossings are proposed via trenchless technologies (directional drilling for the Hershey Mill PS Diversion and jack & bore for the Reserve PS Diversion). Once direction is received from DEP (and possibly the Army Corps of Engineers), we will finalize and submit the GP applications.

Marydell PS Elimination Planning

  • We have prepared draft plans and a draft Penn DOT Highway Occupancy Permit (HOP) application. We are coordinating with PECO regarding mitigation of impacts to overhead utility poles given the proximity of the proposed sewer to the poles. The PECO coordination may impact the HOP application, such as modifications to the exact sewer location. Upon resolution of any such PECO issues, we will finalize and submit the HOP application.

Annual Chapter 94 Reports

  • The Chapter 94 reports for the Westtown Service Area and Lockwood Chase STP were prepared and submitted to DEP on March 30, 2012. DEP received them on April 2, 2012. Following receipt of all required information from the Township and operator, the Chapter 94 Reports for the Ridley Creek STP and the West Goshen Service Area were prepared and delivered to DEP on April 4, 2012.
  • A new influent metering and organic sampling location is needed at the Ridley Creek STP in order to satisfy DEP’s new Chapter 94 requirements. We have discussed the best location with Public Works, and we will forward a recommendation letter to the Authority prior to the April 9, 2012 meeting.

c. Big Fish Environmental Services, Inc. Scott Towler gave the following report on plant operations for March 2012:

Operations and Solids Dewatering/Disposal – Sequencing batch reactors (SBRs)

SBRs numbered 2, 3 and 4 were in service treating wastewater. SBR #1 was off line and serving as a sludge storage tank. During the month, process control testing continued to monitor the (MLSS) concentrations, pH, total alkalinity, chemical oxygen demand (COD), settleability, ammonia as nitrogen, nitrite as nitrogen, nitrate as nitrogen, sludge volume index (SVI), F:M ratio, depth of clear water as measured from the water.

The influent and effluent composite samples were regularly monitored for pH, total alkalinity, ammonia as nitrogen, COD and total Phosphorus. Additional analysis of the effluent was consistently very good during the month. During the month, one key operational set point was established. This operational set point is maintain the pH and total alkalinity concentrations in the SBRs at no less than 7.0 S.U. and 300 mg/L as CaCO3. Maintaining these parameters within the minimum range contributed to improving the nitrification process, settleability and phosphorus removal. Effluent sample data for total phosphorus is reported as 0.28 mg/L without the addition of aluminum sulfate. The monthly average will be finalized upon receipt of the sample collected on March 29 and is anticipated to be close to the effluent limitation of 0.5 mg/L.

The effluent discharge will achieve compliance with the CBOD5, TSS, ammonia as nitrogen, fecal coliform, pH, dissolved oxygen for the month of March 2012. A draft summary is attached for review.

A summary of the influent and effluent sample data for the month of February 2012 is attached for review. The eDMR and supplemental reports for February 2012 have been prepared and submitted by representatives from MEI.

Solids Dewatering

During the period for February 22 through March 31, a total of 947,644 gallons of sludge were metered to have been processed through the centrifuge sludge dewatering unit. A total of 34 dumpsters of dewatered sludge at approximately 437 tons were land filled. Three hundred and eighty-two (382) man hours were expended towards dewatering the sludge in SBR1, sludge holding tanks 1 & 2.

Maintenance, Repairs & Warranty

SBR1 requires one replacement decanter valve assembly – Worth & Co. informed
Centrifuge replacement parts – Worth & Co. to replace parts used for warranty repair
JWC fine screen has a failed UPS – Worth & Co. informed
JWC fine screen upstream transducer – replacement connection on order
SBR and Centrifuge MCC panel hours meters – Worth & Co. informed

Discussion: Scott reported that both sludge tanks are empty and will be cleaned to get ideal conditions. Dana asked Scott to add a line item in the spreadsheet for design basis vs permit basis. Scott will get 94 readings. Scott reported that Worth has a list of warranty issues. Scott recommends getting a permanent influent inflow meter which would cost about $5,000. Mark or Rick will get a proposal for the next meeting.

Any Other Matter - None

Correspondence and Reports of Interest

  1. Letter to residents about a Zoning Hearing Board application
  2. Consent Order & Agreement Semi-Annual Corrective Action Status Report #07

Public Comment – None

Adjournment

The May 14th meeting will start at 6:00 p.m. at the Ridley Creek Sewer Plant.

There being no further business, Joe moved to adjourn the meeting. Jack seconded the motion.
The motion passed unanimously. The meeting was adjourned at 8:15pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 504741
Invoice Date: 04/26/2012
Project: EGMA1105
Project Name: LCSTP Final Design & Permitting

For Services Rendered through: 04/15/2012

Prepared Construction Issue plans and specifications.

Phase : 2 -- Sewer Stakeout and Easements

Total Phase : 2 -- Sewer Stakeout and Easements

Labor : $1,089.00
Expense : $0.00
Phase Total : $1,089.00
Amount Due This Invoice $1,089.00
Fee : $77,800.00
Prior Billings : $59,048.88
Current Billings : $1,089.00
Total Billings : $60,137.88
Phase : 2 -- Sewer Stakeout and Easements
Labor Class Hours/Units Rate Amount
Project Engineer 1.00 $93.00 $93.00
Associate Engineer 12.00 $83.00 $996.00
Labor Total: 13.00 $1,089.00
Total Phase : 2 -- Sewer Stakeout and Easements Labor : $1,089.00
Expense : $0.00
Total Project : EGMA1105 -- LCSTP Final Design & Permitting Labor : $1,089.00
Expense : $0.00

[Handwritten: ok RS 5-11-12]

[Handwritten: 7424-7475]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1105 Invoice Summary

Invoice Date: 04/26/12

Project: LCSTP Final Design & Permitting
Pennoni Job No.: EGMA1105
Invoice No.: 504741
Invoice Period: 3/18/2012 to 4/15/2012
Initial Authorization: $ 77,800.00 Date: 5/5/2011
Changes: $ - Date:
Contract Amount: $ 77,800.00
Previously Invoiced: $ 59,048.88
Current Invoice: $ 1,089.00
Invoiced to Date ($): $ 60,137.88
Invoiced to Date (%): 77%
Remaining Budget ($): $ 17,662.12
Remaining Budget (%): 23%

Budget by Phase:

Phase No. ****
Phase Name: LCSTP Final Design &
Phase Budget: $ 77,800.00
Previously Invoiced: $ 59,048.88
Current Invoice: $ 1,089.00
Invoiced to Date ($): $ 60,137.88
Invoiced to Date (%): 77%
Remaining Budget ($): $ 17,662.12
Remaining Budget (%): 23%

Comments: Prepared Construction Issue plans and specifications.

Pennoni PENNONI ASSOCIATES INC. CONSULTING ENGINEERS INVOICE Newark, DE 302-655-4451 Fax: 302-654-2895 Remit Payment To: Pennoni Associates Inc. P.O. Box 827328 Philadelphia, PA 19182-7328 East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. Invoice #: 504742 Invoice Date: 04/26/2012 Project: EGMA1107 Project Name: HersheyMill &Reserve PS Div Des Per For Services Rendered through: 04/15/2012 Phase : 1 -- Design Prepared draft permit/construction plan sets for Reserve PS Diversion and Hershey Mill PS Diversion; performed PA One Call and initiated existing utility for both projects; prepared draft DEP General Permit GP-5 "Utility Line Stream Crossings" applications for both projects and DEP General Permit GP-8 "Temporary Road Crossings" application for Hershey Mill PS Diversion including PNDI searches and PNDI-required potential impact submission to PA Dept. of Conservation and Natural Resources (DCNR). Total Phase : 1 -- Design
Labor : 4,382.50
Expense : 0.00
Phase Total : 4,382.50
Phase : 4 -- E&SPC Permitting
Total Phase : 4 -- E&SPC Permitting
Labor : 207.50
Expense : 0.00
Phase Total : 207.50
Phase : 6 -- PADEP General Permits
Total Phase : 6 -- PADEP General Permits
Labor : 1,245.00
Expense : 0.00
Phase Total : 1,245.00
Amount Due This Invoice $5,835.00
Fee : 60,200.00
Prior Billings : 8,352.50
Current Billings : 5,835.00
Total Billings : 14,187.50

[Handwritten: OK RS 5-11-12]

[Handwritten: SPLIT 7427-1000 $2917.50]

[Handwritten: 7426-1000 $2917.50]

Continued on next page... INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month. Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Invoice # : 504742

...Continued from previous page

Labor Class Hours/Units Rate Amount
Project Engineer 2.50 93.00 232.50
Associate Engineer 50.00 83.00 4,150.00
Labor Total: 52.50 4,382.50
Total Phase : 1 -- Design Labor : $4,382.50
Expense : $0.00
Labor Class Hours/Units Rate Amount
Associate Engineer 2.50 83.00 207.50
Labor Total: 2.50 207.50
Total Phase : 4 -- E&SPC Permitting Labor : $207.50
Expense : $0.00
Labor Class Hours/Units Rate Amount
Associate Engineer 15.00 83.00 1,245.00
Labor Total: 15.00 1,245.00
Total Phase : 6 -- PADEP General Permits Labor : $1,245.00
Expense : $0.00
Total Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Labor : $5,835.00
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.

Page: 2

East Goshen Municipal Authority

EGMA1107 Invoice Summary

Invoice Date: 04/26/12

Project: Hershey Mill & Reserve PS Diverse Design & Permitting
Pennoni Job No.: EGMA1107
Invoice No.: 504742
Invoice Period: 3/18/2012 to 4/15/2012
Initial Authorization: $ 60,200.00 Date: 7/7/2012
Changes: $ - Date:
Contract Amount: $ 60,200.00
Previously Invoiced: $ 8,352.50
Current Invoice: $ 5,835.00
Invoiced to Date ($): $ 14,187.50
Invoiced to Date (%): 24%
Remaining Budget ($): $ 46,012.50
Remaining Budget (%): 76%

Budget by Phase:

Phase No. 01
Phase Name: Hershey Mill &
Reserve PS
Phase Budget: $ 60,200.00
Previously Invoiced: $ 8,352.50
Current Invoice: $ 5,835.00
Invoiced to Date ($): $ 14,187.50
Invoiced to Date (%): 24%
Remaining Budget ($): $ 46,012.50
Remaining Budget (%): 76%

Comments: Prepared draft permit/construction plan sets for Reserve PS Diversion and Hershey Mill PS Diversion; performed PA One Call and initiated existing utility for both projects and DEP General Permit GP-8 "Temporary Road Crossings" application for Hershey Mill PS Diversion including PNDI searches and PNDI-required potential

Pennoni

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 504744
Invoice Date : 04/26/2012
Project : EGMA1202
Project Name : 2012 COA and I&I Reports

For Services Rendered through: 04/15/2012

Analyze portable flow meter date and permanent flow meter data; attend CO&A status review meeting with M. Miller and R. Smith; prepare and submit CO&A Status Report #07 (Final) to DEP.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services
Labor : 4,152.25
Expense : 0.00
Phase Total : 4,152.25

Amount Due This Invoice : $4,152.25

Fee :13,000.00
Prior Billings :442.75
Current Billings :4,152.25
Total Billings :4,595.00

Phase : **** -- Professional Services

Labor

Class Hours/ Units Rate Amount
Authority Engineer2.00110.00220.00
Project Engineer38.2593.003,557.25
Technical Specialist5.0075.00375.00
Labor Total:45.254,152.25

Total Phase : **** -- Professional Services
Labor : $4,152.25
Expense : $0.00

Total Project : EGMA1202 -- 2012 COA and I&I Reports
Labor : $4,152.25
Expense : $0.00

OK RS 5-11-12
0724- 3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1202 Invoice Summary
Invoice Date 04/26/12

Project :2012 COA and I&I Reports
Pennoni Job No. :EGMA1202
Invoice No. :504744
Invoice Period :3/18/2012to4/15/2012
Initial Authorization :$ 13,000.00Date :1/5/2012
Changes :$ -Date :
Contract Amount :$ 13,000.00
Previously Invoiced :$ 442.75
Current Invoice :$ 4,152.25
Invoiced to Date ($) :$ 4,595.00
Invoiced to Date (%) :35%
Remaining Budget ($) :$ 8,405.00
Remaining Budget (%) :65%

Budget by Phase :

Phase No.****
Phase Name :2012 COA and I&I Reports
Phase Budget :$ 13,000.00
Previousy Invoiced :$ 442.75
Current Invoice :$ 4,152.25
Invoiced to Date ($) :$ 4,595.00
Invoiced to Date (%) :35%
Remaining Budget ($) :$ 8,405.00
Remaining Budget (%) :65%

Comments : Analyze portable flow meter date and permanent flow meter data; attend CO&A status review meeting with M. Miller and R. Smith; prepare and submit CO& A Status Report #07 (Final) to DEP.

Pennoni

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 504745
Invoice Date : 04/26/2012
Project : EGMA1203
Project Name : 2011 Chapter 94

For Services Rendered through: 04/15/2012

Prepared and submitted 2011 Chapter 94 Annual Reports for Ridley Creek STP, Lockwood Chase STP, West Goshen Service Area, and Westtown Service Area (four seperate reports) in DEP’s requied new format; coordinated with Township, contract operator, lab, and DEP to identify and obtain required information for reporting; analyzed existing hydraulic and organic loadings and projected future loadings.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services
Labor : 10,348.75
Expense : 0.00
Phase Total : 10,348.75

Amount Due This Invoice : $10,348.75

Fee :14,000.00
Prior Billings :3,319.00
Current Billings :10,348.75
Total Billings :13,667.75

Phase : **** -- Professional Services

Labor

Class Hours/ Units Rate Amount
Authority Engineer0.50110.0055.00
Project Engineer43.7593.004,068.75
Technical Specialist83.0075.006,225.00
Labor Total:127.2510,348.75

Total Phase : **** -- Professional Services
Labor : $10,348.75
Expense : $0.00

Total Project : EGMA1203 -- 2011 Chapter 94
Labor : $10,348.75
Expense : $0.00

RS 5-11-12
7424 - 3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1203 Invoice Summary
Invoice Date 04/26/12

Project :2011 Chapter 94
Pennoni Job No. :EGMA1203
Invoice No. :504745
Invoice Period :3/18/2012to4/15/2012
Initial Authorization :$ 14,000.00Date :1/5/2012
Changes :$ -Date :
Contract Amount :$ 14,000.00
Previously Invoiced :$ 3,319.00
Current Invoice :$ 10,348.75
Invoiced to Date ($) :$ 13,667.75
Invoiced to Date (%) :98%
Remaining Budget ($) :$ 332.25
Remaining Budget (%) :2%

Budget by Phase :

Phase No.****
Phase Name :2011 Chapter
94
Phase Budget :$ 14,000.00
Previousy Invoiced :$ 3,319.00
Current Invoice :$ 10,348.75
Invoiced to Date ($) :$ 13,667.75
Invoiced to Date (%) :98%
Remaining Budget ($) :$ 332.25
Remaining Budget (%) :2%

Comments : Prepared and submitted 2011 Chapter 94 Annual Reports for Ridley Creek STP, Lockwood Chase STP, West Goshen Service Area, and Westtown Service Area (four separate reports) in DEP’s required new format; coordinated with Township, contract operator, lab, and DEP to identify and obtain required information for reporting; analyzed existing hydraulic and organic loadings and projected future loadings.

Pennoni

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 504746
Invoice Date : 04/26/2012
Project : EGMA1204
Project Name : Lockwood Chase Construction Phase S

For Services Rendered through: 04/15/2012

Issued Notice to Proceed; prepared listing of required construction submittals for contractor; reviewed construction submittals and shop drawings; prepared NPDES Co-Permittee application paperwork; prepared for and attended pre-construction meeting on-site; follow-up to pre-construction meeting including review of proposed manhole elevation near detention basin, advise PW Dept. on maximizing LCSTP spray rate to dewater lagoon and pond, NPDES plan reproduction, etc.; prepared project CAD file for contractor’s surveyor.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services
Labor : 3,035.25
Expense : 0.00
Phase Total : 3,035.25

Amount Due This Invoice : $3,035.25

Fee :16,000.00
Prior Billings :920.25
Current Billings :3,035.25
Total Billings :3,955.50

Phase : **** -- Professional Services

Labor

Class Hours/ Units Rate Amount
Project Engineer23.5093.002,185.50
Associate Engineer0.7583.0062.25
Technical Specialist10.5075.00787.50
Labor Total:34.753,035.25

Total Phase : **** -- Professional Services
Labor : $3,035.25
Expense : $0.00

Total Project : EGMA1204 -- Lockwood Chase Construction Phase S
Labor : $3,035.25
Expense : $0.00

Ok RS 5-11-12
7424 - 7475

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1204 Invoice Summary
Invoice Date 04/26/12

Project :Lockwood Chase Construction Phase S
Pennoni Job No. :EGMA1204
Invoice No. :504746
Invoice Period :3/18/2012to4/15/2012
Initial Authorization :$ 16,000.00Date :2/15/2012
Changes :$ -Date :
Contract Amount :$ 16,000.00
Previously Invoiced :$ 920.25
Current Invoice :$ 3,035.25
Invoiced to Date ($) :$ 3,955.50
Invoiced to Date (%) :25%
Remaining Budget ($) :$ 12,044.50
Remaining Budget (%) :75%

Budget by Phase :

Phase No.****
Phase Name :Lockwood
Chase
Phase Budget :$ 16,000.00
Previousy Invoiced :$ 920.25
Current Invoice :$ 3,035.25
Invoiced to Date ($) :$ 3,955.50
Invoiced to Date (%) :25%
Remaining Budget ($) :$ 12,044.50
Remaining Budget (%) :75%

Comments : Issued Notice to Proceed; prepared listing of required construction submittals for contractor; reviewed construction submittals and shop drawings; prepared NPDES Co-Permittee application paperwork; prepared for and attended pre-construction meeting on-site; follow-up to pre-construction meeting including review of proposed manhole elevation near detention basin, advise PW Dept. on maximizing LCSTP spray rate to dewater lagoon and pond, NPDES plan reproduction, etc.; prepared project CAD field for contractor’s surveyor.

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

Page: 1
03/31/2012
Client No: 6604-01M
Invoice No. 98012

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

General Authority Services

Fees

Date Timekeeper Description Hours Amount
03/12/2012 RFA Review packet for Authority meeting of 3/12/12. 0.50
03/21/2012 RFA Review letter from M. Ellis. 0.30
For Current Services Rendered 0.80 152.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 0.80 $190.00 $152.00

PAID IN APRIL

Previous Balance$1,083.00
Total Current Charges152.00
Balance Due$1,235.00

ok to PAY $ 152 00
RS

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC

Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
04/30/2012
Client No: 6604-01M
Invoice No. 98989

General Authority Services

Fees

Date Initials Description Hours Amount
04/02/2012 RFA Review letter from M. Ellis of 3/29 to DEP. 0.30
04/09/2012 RFA Review packet for Authority meeting of 4/9; attend regular meeting of Authority. 2.60
For Current Services Rendered 2.90 551.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.90 $190.00 $551.00

Account Summary

Date Description Amount
Previous Balance $1,235.00
Total Current Charges 551.00
04/16/2012 Fee Payment -1,083.00
Balance Due $703.00

[Handwritten approval note beside circled $703.00 Balance Due:] OK RS 5/10/12

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To:ABCs
From:Jon Altshul, CFO
Re:Financial reports
Date:April 17, 2012

I would like to attend the May meeting of each ABC to introduce myself to all of you as the new township CFO and gather feedback and suggestions about both the content and format of your financial reports.

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2012
RCSTP BUDGET

Account Title Acct # Annual Budget M-T-D Y-T-D
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 10 35
GRANT REVENUE 07392 0800
TOTAL REVENUE 10 35
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452
R.C. CAP EXPANSION - ELECTRICAL 07424 7453
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456
TRANSFER TO AUTHORITY CAP FUND 07492 0990
TOTAL EXPENSES 0
NET RESULT 10 35

PAGE 1

Report Date 1204 05/11/12 9 : 42 AM

EAST GOSHEN TOWNSHIP
Municipal Authority
April 2012
OPERATING BUDGET

Account Title Acct # Annual Budget M-T-D Y-T-D
REVENUE
INTEREST EARNINGS 07341 1000 5 6
C.C. TAPPING FEES 07364 1100 2,000
R.C.TAPPING FEES 07364 1110 2,000
CONNECTION FEES - SEWER 07364 1130 846
MISCELLANEOUS REVENUE 07380 1000 1,000 423
TRANSFER FROM SEWER OPERATING 07392 0500 125,000 30,700
TOTAL REVENUE 130,000 5 31,975
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 37,669 8,392
MISCELLANEOUS EXPENSE 07424 3000 4,162 950
MUNIC.AUTH.-AUDITING 07424 3110 8,843
ENGINEERING SERVICES 07424 3130 37,066 4,972 6,374
LEGAL SERVICES 07424 3140 12,485 1,083 2,909
M.C.-DVRFA-DEBT SERVICE 07471 1000 19,600
M.C.-DVRFA-INTEREST PAYMN 07472 1000 6,981
TOTAL EXPENSES 126,806 6,055 18,625
NET RESULT 3,194 (6,050) 13,351

PAGE 2

Report Date 1204 05/11/12 9 : 42 AM

EAST GOSHEN TOWNSHIP
Municipal Authority
April 2012
CAPITAL BUDGET

Account Title Acct # Annual Budget M-T-D Y-T-D
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07392 0804
TOTAL REVENUE 0
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 51,764 1,422 2,232
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 170,000
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 37,553 1,366 15,722
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 411,000
HERSHEY MILL STATION - ENGINEER 07426 1000 29,069 2,337
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 46,000
RESERVE PUMP STATION - ENGINEER 07427 1000 29,069 473 1,078
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 93,000
RESERVOIR PUMP STATION - ENGINEER 07428 1000
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000
TOTAL EXPENSES 867,455 3,261 21,368
NET RESULT (867,455) (3,261) (21,368)

PAGE 3

Report Date 1204 05/11/12 9 : 42 AM

East Goshen Township General Ledger

Report Date 05/11/12 GL Transaction Details PAGE 1

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-1400 ADMINISTRATIVE WAGES 0.00
1203 CD 31601 8,391.94 03/13/12 2085 425 EAST GOSHEN TOWNSHIP
1ST QTR.2012 MUNICIPAL AUTHORITY EXPENSES
8,391.94 0.00 8,391.94
8,391.94 0.00 8,391.94
07424-3000 MISCELLANEOUS EXPENSE 0.00
1201 30772 950.00 01/06/12 2081 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2012 ACTIVE MEMBERSHIP DUES
950.00 0.00 950.00
950.00 0.00 950.00
07424-3130 ENGINEERING SERVICES 0.00
1202 31393 220.00 02/22/12 2084 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/15/12 2011 ANNUAL SE
220.00 0.00 220.00
1203 31608 1,182.50 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 2011 ANN SERVICES
1,182.50 0.00 1,402.50
1204 32043 4,971.75 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 2012 GEN.S
4,971.75 0.00 6,374.25
6,374.25 0.00 6,374.25
07424-3140 LEGAL SERVICES 0.00
1202 31393 1,825.68 02/22/12 2083 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 12/12/11 - GEN.AUTH.
1,825.68 0.00 1,825.68
1204 32043 1,083.00 04/12/12 2087 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 2/7-2/29/12 GEN.AU
1,083.00 0.00 2,908.68
2,908.68 0.00 2,908.68
07424-7475 LOCHWOOD ABANDONMENT ENGINEER 0.00
1202 31393 2,600.00 02/22/12 2082 2911 EARTHCORE SERVICES LLC
MOBILIZATION, ATV RIG, AUGER PRO LOCKWOOD ENGINEERING

East Goshen Township General Ledger

Report Date 05/11/12 GL Transaction Details PAGE 2

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-7475 1202 CD 31393 4,315.00 02/22/12 2084 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/15/12 LCSTP FINAL D
*** 6,915.00 0.00 ***
6,915.00 0.00 6,915.00
1203 31608 7,440.50 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 LCSTP FI DESIGN
7,440.50 0.00 14,355.50
1204 32043 1,366.00 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 LOCHWOOD
1,366.00 0.00 15,721.50
15,721.50 0.00 15,721.50
07425-1000 MARYDELL PUMP STATION - ENGINEER 0.00
1203 31608 810.00 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 MARYDELL
810.00 0.00 810.00
1204 32043 1,422.00 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 MARYDELL P
1,422.00 0.00 2,232.00
2,232.00 0.00 2,232.00
07426-1000 HERSHEY MILL STATION - ENGINEER 0.00
1203 31608 2,336.75 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 HERSHEY
2,336.75 0.00 2,336.75
2,336.75 0.00 2,336.75
07427-1000 RESERVE PUMP STATION - ENGINEER 0.00
605.00 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 RESERVE
605.00 0.00 605.00
1204 32043 472.50 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 RESERVE PU
472.50 0.00 1,077.50
1,077.50 0.00 1,077.50
Beg Bal 0.00
39,992.62 0.00 39,992.62

Rick Smith

From:Rick Smith <rsmith@eastgoshen.org>
Sent:Monday, April 16, 2012 2:27 PM
To:‘Robert Dina’
Subject:RE: Safety Issue

Bob

Thanks

I will put this on the Authority’s agenda. There next meeting is on May 14th.

Rick

From:Robert Dina [mailto:rdina@clingerelectric.com]
Sent:Monday, April 16, 2012 11:23 AM
To:rsmith@eastgoshen.org
Cc:Joe Natale
Subject:Safety Issue

Rick,

I wanted to send you a copy of the pages of the Collective Bargaining Agreement that we must follow as a Union Contractor. The front cover provides the date of the agreement to show it is current and the rule is found on page 23 of that agreement Section 4.19, which I have clouded, that clearly indicates that “On all energized circuits or equipment carrying 440 volts or over, as a safety measure, two or more journeyman must work together”. I can bring you a full booklet if you deem it necessary.

I hope this can settle this issue and we can get paid in full for our invoice. I appreciate your patience in this matter and will continue to work with you on this.

Thank you,

Robert F. Dina, Sr.
Cell: (484) 325-1126 | Email: rdina@clingerelectric.com

CLINGER
736 Baltimore Pike, P.O. Box 158, Concordville, PA 19331
Office: (610) 459-1234 | Fax: (610) 459-8823 | www.ClingerElectric.com

LEGAL DISCLAIMER: The information contained in this communication is confidential and may be legally privileged. It is intended solely for the use of the individual or entity to whom it is addressed and others authorized to receive it. If you are not the intended recipient: (A) You are hereby notified that any disclosure, copying, distribution or taking any action with respect to the content of this information is strictly prohibited and may be unlawful. (B) You are kindly requested to inform the sender immediately. (C) You are kindly requested to destroy any copies. Robert F. Dina, Sr. or Clinger Corporation is neither liable for the proper and complete transmission of the information contained in this communication nor for any delay in its receipt.

1

COMMERCIAL,
MAINTENANCE &
INDUSTRIAL
AGREEMENT

Between the

Chester Division
Penn-Del-Jersey Chapter
N.E.C.A.

and

Local Union No. 654
I.B.E.W.

Effective Date:
June 1, 2009 - May 27, 2012

Section 4.11 - During periods where less than 50% of Journeymen normally employed are employed, the Labor-Management Committee shall have the right to limit the maximum number of hours a month per man, in order to increase the number of men employed.

Section 4.12 - Journeymen and Apprentices shall provide themselves with a standard conventional kit of tools necessary to perform their classification of work.
3/2008

Section 4.13 - Workmen shall be held responsible for the Employer’s tools and equipment, providing the employer furnishes a tool box with proper lock or other safe place for the storing of such tools or equipment and allows reasonable time for such care.

(a) The Employer shall provide a safe place for workmen’s tools and clothing; in the event of loss by fire, he shall be held responsible for replacement thereto.

Section 4.14 - Workmen shall install all electrical work in a safe and workmanlike manner and in accordance with applicable code and contract specifications.

(a) All electrical work including temporary light and power shall be done by men employed under the terms of this agreement.

(b) On jobs whenever temporary lighting, power and/or equipment is required for productive construction in other than regular working hours by workmen other than electricians, at least one (1) Journeyman electrician shall be employed on the site. This journeyman shall do productive work when not engaged in temporary work.

(c) On renovation, repair, or maintenance temporary light, power, and equipment shall be installed and maintained by electrical workers covered under this agreement. No work shall be performed outside of the regular working hours to maintain or repair this temporary light, power, or equipment unless it is specifically at the employer’s request.

(d) Under all project circumstances, temporary electric shall be left energized and in working condition past the normal working hours for lighting, heating/air conditioning, job trailers and shanties, receptacles used for equipment charging, ingress/egress and security without the requirement for a journeyman electrician to be employed past the normal working hours.
3/2008

22

Section 4.15 - A Journeyman shall be required to make corrections on improper workmanship for which he is responsible on his own time and during regular working hours, unless errors were made on orders of the employer or the employer’s representative. Employers shall notify the Union of workmen who fail to adjust improper workmanship and the Union assumes responsibility for the enforcement of this provision.

Section 4.16 - The representative of the Union shall be allowed access to any shop or job at any reasonable time workmen are employed under the terms of this agreement.

Section 4.17 - The Employer shall pay for traveling time and furnish transportation from shop to job, job to job, and job to shop, within the jurisdiction of the Union, except when an Employee uses his own transportation, he shall be compensated by his Employer, at no less than twenty-two cents ($.22) per mile, from shop to job, job to job, and job to shop, within the jurisdiction of the Union. On work outside the jurisdiction of the Union, the Employer shall furnish transportation, board and all other necessary expenses.

Section 4.18 - No traveling time shall be paid before or after working hours to workmen for traveling to and from any job in the jurisdiction of the Union when workmen are ordered to report on the job.

Section 4.19 - On all energized circuits or equipment carrying 440 volts or over, as a safety measure, two or more journeymen must work together.

Section 4.20 - The policy of the Members of the Local Union is to promote the use of materials and equipment manufactured, processed or repaired under economically sound wage, hour and working conditions by qualified electrical workers.

Section 4.21 - On jobs having a Foreman, workmen are not to take directions or orders, or accept the layout of any job from anyone except the Foreman.

On jobs having a General Foreman, all directions or orders shall be processed through the General Foreman.

Section 4.22 - No workman shall act as a Foreman on more than one job at a time.

23

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FILE

February 22, 20121

Mr. Robert Dina
Wm. H. Clinger Corporation
P.O. Box 158
Concordville, PA 19331

Re:Ridley Creek Sewage Treatment Plant
Invoice M 11143

Dear Bob:

The Municipal Authority discussed the above referenced invoice at their meeting on February 20, 2012. They did not believe it would be appropriate to pay to have two people respond to what was essentially a service call to determine if a repair was a warranty item.

In their experience the mechanic or electrician would respond, make an assessment of the situation and communicate the required information to his office. Based on the information the electrician would then advise us if the repair was covered under warranty or not.

They did note that they would consider payment of an invoice that reflected the labor cost for the electrician only. Accordingly if you can send a corrected invoice in the amount of $614.04 they would consider it at their meeting on March 12, 2012.

Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Rick
Louis F. Smith, Jr.
Township Manager

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Electrical\Letter 022212.doc

CLINGER

Over a half-century of excellence

736 Baltimore Pike
P.O. Box 158
Concordville, PA 19331
Phone: (610) 459-1234
Fax: (610) 459-8823
Website: clingerelectric.com

Invoice

EAST GOSHEN MUNICIPAL AUTHORITY
ATTN: ACCTS. PAYABLE
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6199

Job: CEG800
Work Performed: Electrical - Miscellaneous

Invoice #: M11143
Invoice Date: 12/23/11
Due Date: 01/22/12
PO #: VERBAL
Customer ID: 204
Contact: RICK SMITH
Contact: MARK MILLER

Description: Labor Thru Week Ending 12-25-11 | Price | Total

Work Order#: Amount
PLEASE SEE ATTACHED
WO#: 08690,08725 $ 1,484.04
Subtotal $ 1,484.04
Previously Paid $0.00
NET PAYMENT CURRENT DUE $1,484.04

Please make checks payable to: Wm. H. Clinger Corp.

ELECTRICAL CONSTRUCTION | IT | ALTERNATIVES | LEED | ENERGY AUDITS

WILLIAM H. CLINGER, CORP.

P. O. Box 158
736 Baltimore Pike
Concordville, Pa. 19331
phone (610) 459-1234
fax (610) 459-8823

WORK ORDER # 08725

SHEET 1 OF 1
FOR JOB CEG-800

TO:
East Goshen Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, Pa. 19380-6199
Attn: Mr. Rick Smith & Mr. Mark Miller

TERMS: Net 30 Days

Field Value
DATE RECEIVED BY OFFICE
INVOICE #
INVOICE DATE
FOREMAN Ed Kikut
CUSTOMER'S ORDER #
T & M X
CHANGE ORDER
JOB NAME / NUMBER CEG-800
JOB LOCATION Plant
PERCENT COMPLETE 100.00%
WEEK ENDING * 12/25/11

* Week begins on Monday and ends on Sunday

DESCRIPTION OF WORK

Troubleshoot ME-45 Floc Tank Mixer - Control Circuit Fault. Isolated cause to 120V coming from FFCP. Reset the VFD and isolated the start circuit in the VFD. VFD was running in the HAND mode at 100%. Control company needs to fix this fault.

MATERIALS

QTY. MATERIAL PRICE AMOUNT
0.00
0.00
0.00
0.00
Subtotal 0.00
10% Markup 0.00
TOTAL MATERIALS 0.00

OTHER CHARGES

TOTAL OTHER: 0.00

LABOR

LABOR DATE ST OT DT HRS. RATE AMOUNT
Ed Kikut 12/21/11 ST 4.00 102.34 409.36
Robert F. Dina, Sr. 12/21/11 ST 4.00 145.00 580.00

TOTALS

Item Amount
TOTAL HOURS AND LABOR 989.36
TOTAL MATERIALS 0.00
TOTAL OTHER 0.00
TAX
TOTAL OTHER 989.36

DATE COMPLETED:

Work Ordered by: Scott Towler

Signature:

Thank You

WILLIAM H. CLINGER, CORP.

P. O. Box 158
736 Baltimore Pike
Concordville, Pa. 19331
phone (610) 459-1234
fax (610) 459-8823

WORK ORDER # 08690

SHEET 1 OF 1

FOR JOB East Goshen Waste Water Plant

TO:
East Goshen Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, Pa. 19380-6199
Attn: Mr. Rick Smith & Mr. Mark Miller

TERMS: Net 30 Days

DATE RECEIVED BY OFFICE
INVOICE #
INVOICE DATE
FOREMAN Ed Kikut
CUSTOMER'S ORDER #
T & M X
CHANGE ORDER
JOB NAME / NUMBER CEG-800
JOB LOCATION Plant
PERCENT COMPLETE 100.00%
WEEK ENDING * 12/04/11

* Week begins on Monday and ends on Sunday

QTY. MATERIAL PRICE AMOUNT DESCRIPTION OF WORK
0.00 Got called on 11/28/11 regarding a warranty issue with the exhaust fan in the
0.00 Centrifuge Dewatering room. Responded to this call on 12/1/11 with Ed Kikut, my
0.00 electrician, found that someone else took the starter apart and removed a coil.
0.00 Determined that starter belonged to Worth so this was not our warranty issue.
Verified that feeder and xfmr were good but that's all we could do.
Subtotal 0.00
10% Markup 0.00
OTHER CHARGES
TOTAL OTHER 0.00
LABOR DATE ST OT DT HRS. RATE AMOUNT
Ed Kikut 12/01/11 ST 2.00 102.34 204.68
Robert F. Dina, Sr. 12/01/11 ST 2.00 145.00 290.00
TOTAL HOURS AND LABOR 494.68
TOTAL MATERIALS 0.00
TOTAL OTHER 0.00
TAX
TOTAL OTHER 494.68

DATE COMPLETED:

TOTAL MATERIALS: 0.00

Thank You

Work Ordered by: Scott Towler

Signature:

APRIL 2012
EAST GOSHEN MUNICIPAL AUTHORITY GOALS

ON-GOING

  1. Submit an article for each newsletter. Need by 2/8/12 - Kevin - Completed; Need by 5/2/12 –Jack - Completed; Need by 8/1/12; Need by 11/7/12; February 2013
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack - Completed; 2 nd Quarter (June) - Joe; 3 rd Quarter (September) - Dana; 4 th Quarter (December) - Kevin
  3. Respond to capacity requests in 45 days or less.
  4. Implement I & I Plan
  5. Conduct a sewer facilities tour after RCSTP construction is complete – Have tour in September

PROJECTS

  1. Lockwood Bid – Bid awarded 2/20 – Contract executed 3/12; Pipe Installation - Notice to proceed issued 3/20, Work in progress; Abandon Plant
  2. Marydell Pump Station Design/Permit; Bid; Pipe Installation; Abandon Pump Station
  3. Hershey Mill Pump station Design/Permit; Bid; Pipe Installation
  4. Reserve Pump station Design/Permit; Bid; Pipe Installation; Abandon Pump Station

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2012\051412.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 11, 2012

To: Municipal Authority

From: Mark Miller

Re: April Monthly Report

C.C. Collection: We received a call from a resident on Heather Lane stating that there lateral needed repairs. We looked at the lateral and found that the stack had pulled out of the tee. I stood on the stack and pushed the pipe back into the tee. While visiting the Hershey Mill Pump Station the crew found a sewer manhole overflowing. We entered the downstream manhole and removed several 5 gallon buckets of grit; we then jetted the line to clear the clog. We received 12 calls for lateral cap replacement during the month.

ACTION ITEM: I would like your approval to have Pennoni investigate the cost to install a Muffin Monster at the Hershey Mill Pump Station. With additional flow I believe we are going to have a problem with debris.

R.C. Collection: The pumping station was visited on a daily basis, the basket was cleaned. We are still adding chemicals to fight the grease. There were no problems during the month of April. We did receive calls for 7 laterals during the month.

F:\Data\Shared Data\Public Works Dept\Monthly Reports\2012 Municipal\April monthly Report for Municipal Authority, dated May 11.docx

Lochwood Plant: As you know the contractor has started the sewer work, they started at the swim club on Tanglewood Drive, the road crossing took them 3 days due to utility conflicts. Once they crossed the road they hit rock which took 3.5 days to get thru. They are currently in good dirt and working their way thru the open space. Matt and I are taking turns inspecting.

Dusty Kilgore and Kevin Miller have completed the sewer maintenance courses at Delaware Community College; they have expressed interest in attending other courses when they come up.

Alarms: We received 22 alarms for the month.

PA One Call: We had 87 PA One calls for the Month of April.

F:\Data\Shared Data\Public Works Dept\Monthly Reports\2012 Municipal\April monthly Report for Municipal Authority, dated May 11.docx

[Photograph: Excavated trench behind a road curb exposing soil and rock layers.]

Label on yellow sticky note: Trench behind curb

[Photograph: Hydraulic breaker hammer attachment operating on rock inside an excavation trench.]

Label on yellow sticky note: Rock

[Photograph showing a cleared construction corridor through a wooded area with a yellow trench box in the foreground, orange safety fencing, and a tracked loader/bulldozer in the background.]

Looking Towards Lochwood from Tanglewood Dr

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

East Goshen Township
Ridley Creek Sewage Treatment Plant

Plant Inspection - April 11 & 13, 2012
Inspection and Notes completed by Matt McAloon

On site as requested by the Township to document the condition, housekeeping, overall operations and maintenance of the plant and process testing done at the WWTP by the plant operator.

Screen Building

  • The exhaust fan adjusted and is now controlled by thermostat
  • Building is clean and well organized
  • The seal tight flexible conduit to both the upstream and downstream level transducers is not connected and secured to the level transducer unit
  • The level transducers for the screen unit is not working, screen unit is running constantly
  • The JWC screening unit is running without any excess noise or evidence of excess wear
  • AQUA Environmental onsite to clean and vacuum grit and solids out of the screen building flow and bypass channels.
  • An additional sampler line was routed to the screen building influent channel, up stream of the grinder and screen, to fulfill Chapter 94 sampling requirements.

Influent Pump Station

  • AQUA Environmental onsite to wash the walls of the wet well, vacuum grease floating on top of the wet well, and vacuumed solids from the collection box sump
  • Sampler line was rerouted and secured away from the pumps
  • Strain reliever / Kellum grip for influent pump P-13 connected

Meter Pit

  • East Goshen Public Works reported that the meter was recently replaced under warranty by Worth & Co.
  • Influent meter appears to be accurately working and was recently calibrated.

Treatment Building

  1. Alum Tank & Chemical Feed Systems The Alum system is currently shut off and Alum is not being used in the treatment process.; Alum tank currently reading 5.93’; Worth & Co has been notified of the evidence of leaking Alum and excessive corrosion on the mounting bracket for SBR # 2 Alum Feed MOV (CV-32) and directed to repair the item under warranty; ME-34 (Polymer Injection System) is off, operator verified the system was filled with mineral oil and taken off line; Both Watson Marlow pump are energized and set to 64.5 RPMs and in auto but not running at the time of inspection. A tote of Magnesium Hydroxide is connected to the suction side of chemical feed pump MP-32

121 Continental Drive • Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

  • The addition of sodium bisulfate (dechlorinating agent), previously tapped into the injection port of the Polymer Static mixer (ME-41), has been disconnected and the of sodium bisulfate barrels removed.
  • High pressure Alum Feed Pump (MP-33) and VFD (MP-33VFD) are energized, but not in operation.
  1. UV System / structure The missing rack of UV lights in Bank # 1 has not been returned or reinstalled by Siemens.; 1 bank of UV lights are on (Bank # 2); Flow reading at UV control panel: 0.34 MGD; No solids or floc is visible in the UV channel and weir, the water is clear with low turbidity.; The Plant operator washed and scrubbed UV discharge weir while during the April 13, 2012 inspection.
  2. Disk Filters Drain valves to both disk filers are closed.; Disk filters are clean, walls and weirs were recently scrubbed by the operator; Insecticide in floating dispensers utilized in the influent weir of both filters; Plant operator has agreed to investigate tension in disk filter drive chains and adjust according to Aqua Aerobics O & M manuals.; Filters are backwashing and sludge wasting on cycle, at time of inspection both filters were online and a backwash cycle was manual triggered: Disk filter #1: 113 minutes since last sludge wasting, 50.8 minutes since last back wash & pulled 17 in Hg suction in backwash Disk filter # 2: 21 minutes since last sludge wasting, 160.1 minutes since last back wash & pulled 5.9 in Hg suction in backwash; Disk filter #1: 113 minutes since last sludge wasting, 50.8 minutes since last back wash & pulled 17 in Hg suction in backwash; Disk filter # 2: 21 minutes since last sludge wasting, 160.1 minutes since last back wash & pulled 5.9 in Hg suction in backwash; Filter 1: total time in backwash 95105.6 min & total sludge wasting 6363.5 min; Filter 2: could not read total time in backwash (exceeded hour meter limit) & total sludge wasting 6118.4.9 min; As visible from the top of the filter platform when the filter feed pumps are on, flow to the filters appeared to be clear with minimal solids, only isolated foam and flecks of grease; There is a leak in the vacuum pump piping 90 degree bend in filter # 1.; Operator reported that both filters were drained a number of times and heavy sludge build ups and deposits removed; Composite sampler set up to sample the influent flow to filter # 1.; Constant flow to filters from the filter feed pumps and post EQ tanks.
  3. Blower Room / Utility Water System Cannot verify the oil was checked or changed in any of the blowers; The noise canceling panels were removed from blower # 3; The blower room exhaust fan & louver working and controlled by thermostat; Utility water system online and operating between 45 and 50 psi, both bladder tanks online.
  4. Control / Electrical Room Control room is neat and well organized; None of the MCC are tripped or locked out, and not of the VFDs are showing unusual faults; 46 gallons per minute flow to Applebrook, flow charts indicate an almost constant flow through the Applebrook flow meter; 482 gallons per minute effluent discharge flow (not including Applebrook); Limit switch to SBR # 3 Alum feed MOV (C-34) failed.

121 Continental Drive • Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

  1. SBR Tanks At the time of the April 13, 2012 inspection the plant operator was running the plant on two SBRs: SBR # 3 & # 4 online and running, #2 SBR off and decanting / draining in prep to be taken off line, SBR # 1 draining to sludge digester.; Plant operator onsite washing down the walls to the SBR tank # 2 as it was drained; MLSS in tanks # 3 & # 4 (active SBRs) is low and within the acceptable design range; One of the plunger valves on the decanter is broken; Worth & Co notified and will repair under contract warranty
  2. General All of the SBR Decant knife gate valves are open; The large piles of dead bugs have been removed from under bug zapper; The exhaust fan above the UV and the associated louver are operational and controlled by the thermostat; The Apple Brook meter is operating and reading 45 gpm

Centrifuge / Sludge Handing & EQ Tanks

  • The centrifuge still has 99.9 hours on the hour meter and the Moyno Grinder pump control panel has 714 hours on the control panel. The flow meter in the centrifuge pump room reads 1,498,769 gallons. Worth and Co. have been notified about the detective hour meter on the centrifuge control panel.
  • During the April 11, 2012 site visit, both digesters were at less than 2', all onsite sludge was dewatered in the centrifuge and hauled off site. Operator reports a total of 38 dumpsters of sludge were hauled offsite.
  • After pressing was complete the centrifuge was shut down, Cleaned in Place (CIP), the bowl fully cleaned, and polymer system charged with mineral oil.
  • Early in the new operator's tenure the damaged bearings in were removed and replaced by the township and plant staff.

Existing Control Building

  • No change
  • No faults or alarms visible in the new or existing MCCs
  • 93 spikes recorded on the control building TVSS

Sludge Digesters / Post EQ tanks

  • Post EQ Tanks were drained and cleaned April 11, 2012. Heavy layer of sludge six plus inches thick was washed off the walls collected and removed from the site by AQUA Environmental with the assistance of the plant operator.
  • As viewed during the April 13, 2012 site inspection the Post EQ tanks clear and with good clarity and no sludge deposits on the tank walls
  • The blowers to the Post EQ Tanks are on and operational with consistent air bubble patterns
  • Post EQ tanks and filter feed pumps set to provide a constant forward flow to the disk filters
  • Per the plant operator the sludge digester telescoping valves are operating properly and as designed
  • Sludge Digester # 1 is empty and Sludge Digester # 2 is being used as a holding tank for MLSS pumped out of SBR # 1 and SBR # 2.

121 Continental Drive • Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

  • The sludge in the digester is a light chocolate milk color with moderate foaming
  • All of the air drops to the sludge digester / holding tanks appear to be working (one or two of the couplers for the air drops are leaking air)

Discharge of Ridley Creek

  • V notch weir for the effluent meter was cleaned and appears to be providing more accurate flow readings
  • Constant flow from the Post EQ tanks, through the disk filters and UV, allows the utility water pumps and Applebrook discharge pump to draw effluent as required without frequently shutting down due to low flows.
  • At the time of inspection, Ridley Creek Sewage Treatment Plant is in compliance with the new discharge permits and operations appear to be organized and efficient.

121 Continental Drive • Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

EGMA 1200

Pennoni

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager

FROM: Daniel Barbato, P.E.
Authority Engineer

DATE: May 1, 2012

SUBJECT: Engineer’s Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • The plant was inspected in detail on April 11 and13. The purpose of the inspection was to compare the current operation and plant condition to the conditions documented in the March 5, 2012 report, which was immediately following the departure of Miller Environmental. The majority of the deficient conditions appear to have been corrected. The buildings were clean and well organized, the alum feed system is not currently required, the disk filters were clean and appeared to be operating properly, sludge levels in the digesters was acceptable, and effluent appeared clear at the time of the inspections. A detailed inspection report is attached. In summary, several conclusions and observations can be made: Miller Environmental was not properly operating the plant.; Housekeeping and process data collection was poor.; The plant is capable of meeting the new discharge limitations.; Miller’s claim that design shortcomings in the plant inhibited their ability to operate the plant is unfounded, particularly in light of the demonstration of the plant performance over the past two months.; The centrifuge is capable of processing solids.; Miller Environmental did not properly manage and remove solids at the facility.; Miller Environmental relied too heavily on chemical treatment, particularly alum.; The plant is currently being operated properly, with good data management, housekeeping, and maintenance practices.

Page 1 of 3

P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-05-01 rev1.docx

EGMA 1200

LCSTP Elimination

  • The contractor, SJM Construction Company, began construction on May 1 installing E&S controls and performing site clearing. Sewer construction began on May 3, and they are tentatively projecting approximately 60 days to complete the work. The required contract completion date is July 2, 2012.
  • We have been performing close to full-time construction inspection services from the start of construction on May 3 through the time of this report. Full-time inspection is planned to continue at least until the contractor is no longer excavating rock. We expect to be out of rock by May 11.
  • As of this report, the contractor is encountering rock at shallower depths (higher elevations) than indicated in the Township’s pre-construction borings. The rock removal contract quantity is 75 c.y. We are currently estimating the actual rock removal quantity will be a little over 100 c.y., resuling in an increased cost of approximately $3,000 due to the increased quantity.
  • The existing drop connection at Existing Manhole EXMH-8 along Tanglewood Drive was not damaged during construction of the new sewer, so the Bid Add Item for that item of work will not need to be exercised. That Add Item was bid at $5,300.00
  • We have provided in-office construction support on scheduling, Tanglewood Drive closure, detour/closure signage, marking and extent of tree clearing, rock quantification, and verification that the existing lateral from 924 Dolphin Dr. will not conflict with the proposed sewer based upon the measured lateral depth leaving the house.
  • We reviewed additional construction submittals including the contractor’s pre-construction video. All submittals have been “Approved” or “Approved as Noted”.
  • We issued a Construction Issue set of plans and specifications to the contractor and Township to incorporate the various addenda into one set of plans and specifications.

Hershey Mill PS Diversion and Reserve PS Elimination

  • We previously prepared draft plans and draft applications for DEP General Permits (GP) for Stream Crossings. The PNDI Receipt for the Hershey Mill PS Diversion identified potential threats to two plant species. We prepared and submitted the required documents to DCNR for their comments/approval regarding the potential threats, and we are awaiting feedback. It also appears that additional construction easements will be required to install a temporary construction bridge stream crossing for the Hershey Mill PS Diversion, and we are coordinating with the Township to determine if the General Permit for a temporary crossing should be pursued as a result.

Marydell PS Elimination

  • We have prepared draft plans and a draft PennDOT Highway Occupancy Permit (HOP) application. We are continuing attempts to coordinate with PECO regarding mitigation of impacts to overhead utility poles given the proximity of the proposed sewer to the poles. The PECO coordination may impact the HOP application, such as modifications to the

Page 2 of 3

P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-05-01 rev1.docx

EGMA 1200

exact sewer location. Upon resolution of any such PECO issues, we will finalize and submit the HOP application.

Annual Chapter 94 Reports

  • A new influent metering and organic sampling location is needed at the Ridley Creek STP in order to satisfy DEP’s new Chapter 94 requirements. We have discussed the best location with Public Works, and we forwarded a recommendation letter to the Authority prior to the April 9, 2012 meeting.

Page 3 of 3

P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-05-01 rev1.docx

BIG FISH ENVIRONMENTAL SERVICES, INC.

April 2012 - Ridley Creek and Lochwood Sewage Treatment Plant Operations Report

Executive Summary

Treatment Process Operation

Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service until April 11th. SBR No. 2 was removed from service on April 11, 2012 to evaluate the treatment performance through utilizing two (2) SBRs Nos. 3 and 4. The following observations were recorded with only two (2) SBRs in service;

  • Occasional filled decants attributed to diurnal flow loadings.
  • Nitrification and denitrification was achieved.
  • Nitrate concentrations became elevated contributing to denitrification within the SBRs during settle phase.
  • Phosphorus removal within the effluent limitation was achieved without alum.
  • DO trends during peak flow periods indicated significant oxygen demand (minimum to no desired “DO peaks”).
  • SBR surface developed a layer of foam. Microscopic examinations did not identify Norcardia sp. as the main contributing factor for development of foam.
  • The F:M ratio increased (160 minutes fill cycles)
  • Effluent clarity remained good; however, the final effluent exhibited a slight color (similar to the discharge from a trickling filter treatment process). The final effluent achieved permit compliance with the discharge limitations.

On April 7, 2012, transfer of treated effluent to the Applebrook golf course lagoon commenced.

On April 22, 2012, the chemical feed system to provide alum to the floc tank mixer and influent to the disc filters was placed in service. It should be noted that the use of alum to assist in phosphorus removal was driven by the uncertainty of compliance with the NPDES permit. Typical laboratory turnaround for analytical reports is two weeks, with the April 5th sample report received on April 27th. Split sample analysis between on-site testing and the laboratory indicates elevated sample results obtained on site as compared to ALS. Evaluation of selected laboratory accreditation is warranted.

On May 2, 2012, SBR No. 1 was placed in service, in addition to SBR Nos. 3 and 4.

A summary of the influent and effluent sample data for the month of March 2012 is attached for review. The eDMR and supplemental reports for March 2012 have been prepared and hand delivered to PA DEP by BFESI on April 27, 2012. As required by the NPDES permit effective March 1, 2012, the following supplemental reports accompanied the DMR;

  • Daily Effluent Monitoring Report
  • Chemical Additives Report
  • Sewage Sludge/Biosolids Production and Disposal Report 1 of 3
  • Sewage Sludge/Biosolids Production and Disposal Report 2 of 3
  • Sewage Sludge/Biosolids Production and Disposal Report 3 of 3
  • Hauled in Municipal Waste Report
  • Influent & Process Control Form
  • Laboratory Accreditation Report

BIG FISH ENVIRONMENTAL SERVICES, INC.

April 2012 - Ridley Creek and Lochwood Sewage Treatment Plant Operations Report

Flow data:

Flow Meter Location March 2012 Total Volume for Month, MGD Average Daily Flow, gpd
Influent Wastewater 9.996 322,443
Treated Effluent to Disc Filters 9.349 322,388
Final Effluent Discharge 7.486 241,484
Applebrook Golf Course 0 0
Flow Meter Location April 2012 Total Volume for Month, MGD Average Daily Flow, gpd
Influent Wastewater 10.393 346,428
Treated Effluent to Disc Filters 8.901 296,713
Final Effluent Discharge 5.291 176,367
Applebrook Golf Course 1.150 50,.013

Chemical Usage:

Chemical Daily Average Total Monthly
Soda Ash 175 lbs./day 5,450 pounds
Magnesium Hydroxide 25 gpd 780 gallons
Alum 0 gpd 0 gallons

Solids Dewatering and Disposal

The centrifuge was operated from April 1st through April 5th. Two dumpsters were removed.

In preparation for a long term shut down, the clean in place procedure (CIP) was performed and the machine was cleaned. The polymer system was purged with mineral oil to prevent polymer building within the system

Maintenance, Repairs and Warranty

Completed: SBR No. 1 Decanter - repaired
Outstanding: Centrifuge replacement parts – Worth & Co. to replace parts used for warranty repair
Outstanding: JWC fine screen has a failed UPS – Worth & Co. informed
Outstanding: JWC fine screen upstream transducer – replacement connection scheduled for installation
Outstanding: SBR and Centrifuge MCC panel hour meters – Worth & Co. informed
Outstanding: Leaking PVC valves for alum piping to SBRs
Outstanding: Sludge holding tank aeration piping paint is failing

Month of March 2012

East Goshen Township Municipal Authority
Ridley Creek Sewage Treatment Plant Monthly Operations Report

FINAL REPORT

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57
Sample date
March 1, 2012 0.2680 398 890 396 885 25.8 58 36.9 82 4.3 10
March 8, 2012 0.3229 210 469 425 950 32 72 49 110 5.5 12
March 15, 2012 0.3214 193 431 255 570 31.3 70 44.9 100 5.6 13
March 22, 2012 0.3250 488 1,091 208 465 29.4 66 40 89 4.7 11
March 29, 2012 0.3087 598 1,337 2350 5,252 25.5 57 38.7 86 6.0 13
Average 0.3092 377 843 727 1624 29 64 42 94 5 12
Minimum 0.2680 193 431 208 465 26 57 37 82 4 10
Maximum 0.3250 598 1337 2350 5252 32 72 49 110 6 13
Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample date
March 1, 2012 0.2420 3.2 6 5 10 0.100 0.20 0.10 0.20 1 0.0000
March 8, 2012 0.2240 3.1 6 6 12 0.100 0.20 0.14 0.28 1 0.0000
March 15, 2012 0.2200 2.8 6 5 10 0.209 0.42 0.28 0.57 1 0.0000
March 22, 2012 0.2240 2.0 4 5 10 0.114 0.23 0.54 1.09 1 0.0000
March 29, 2012 0.2210 3.1 6 10 20 0.355 0.72 1.20 2.42 64 1.8062
Average 0.2262 2.8 6 6 13 0.176 0.35 0.45 0.91 14 0.3612
Minimum 0.2200 2.0 4 5 10 0.100 0.20 0.10 0.20 1 0.0000
Maximum 0.2420 3.2 6 10 20 0.355 0.72 1.20 2.42 64 1.8062

Page 1 of 1

April 2012

DRAFT

East Goshen Township Municipal Authority
Ridley Creek Sewage Treatment Plant Monthly Operations Report

Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57
Sample date
April 5, 2012 0.2522 3960 8,329 950 1,998 57.7 121 437 919 97.4 205
April 12, 2012 0.9611 263 553 88 185 24.2 51 33.9 71 3.9 8
April 20, 2012 0.3600
April 26, 2012 0.2833
0 0 0
Average 0.4642 2112 4441 519 1092 41 57 235 330 51 71
Minimum 0.2522 263 553 88 185 24 0 34 0 4 0
Maximum 0.9611 3960 8329 950 1998 58 121 437 919 97 205

April 5 sample collected from influent channel prior to fine screen is not representative as a result of excessive grit/sediment resultant in channel.

SBR Effluent Discharge to Disc Filters
Design Basis Flow CBOD5 TSS Phosphorus, Total NH4-N Nitrate/Nitrite TKN Total Nitrogen
mg/L lbs/day mg/L lbs/day mg/L mg/L mg/L mg/L mg/L
MGD Average 5.0 31 5.0 31 1.0 1.0 ND ND 10
April 12, 2012 0.2921 15.8 33 64 135 0.83 No test 4.7 3.80 8.5
Average 0.2921 16 33 64 135 1 5 3.80 9
Minimum 0.2921 16 33 64 135 1 5 3.80 9
Maximum 0.2921 16 33 64 135 1 5 3.80 9
Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample date
April 5, 2012 0.1880 5.6 9 <5 8 0.200 0.2 0.66 0.2 1 0.0
April 12, 2012 0.2060 2.8 4 <5 8 0.195 0.3 0.22 0.3 1 0.0
April 20, 2012 0.1080
April 26, 2012 0.1490
Average 0.1628 4 7 #DIV/0! 8 0.198 0 0 0 1 0
Minimum 0.1080 3 4 0 8 0.195 0 0 0 1 0
Maximum 0.2060 6 9 0 8 0.200 0 1 0 1 0

Page 1 of 1

RECEIVED
APR 12 2012
BY:

East Goshen Township Flows
March
2012

Date West Goshen Plant Flow mgd West. Way Pump Station mgd Ellis Lane Meter Pit mgd Paoli Pike Meter Pit mgd Wilson Drive Meter Pit mgd West. Way Meter Pit mgd Total East Goshen Flow mgd
1 6.353 1.840 0.274 0.055 0.069 1.162 0.764
2 5.069 1.711 0.302 0.058 0.057 1.275 0.858
3 5.880 1.791 0.303 0.059 0.057 1.275 0.856
4 5.547 1.763 0.302 0.058 0.057 1.275 0.858
5 5.474 1.660 0.226 0.061 0.065 1.095 0.743
6 5.703 1.556 0.231 0.058 0.068 1.116 0.759
7 5.024 1.602 0.234 0.057 0.066 1.162 0.805
8 5.212 1.621 0.243 0.027 0.069 1.092 0.753
9 5.127 2.092 0.236 0.063 0.049 1.183 0.835
10 4.962 1.569 0.237 0.064 0.050 1.184 0.833
11 5.306 1.646 0.236 0.063 0.049 1.183 0.835
12 4.866 1.561 0.213 0.045 0.075 1.116 0.783
13 5.426 1.590 0.228 0.065 0.085 1.176 0.798
14 5.232 1.580 0.213 0.065 0.086 1.132 0.768
15 4.707 1.576 0.254 0.063 0.081 1.106 0.708
16 4.732 1.322 0.195 0.061 0.062 1.098 0.780
17 4.814 1.534 0.196 0.062 0.062 1.099 0.779
18 5.347 1.609 0.195 0.061 0.062 1.098 0.780
19 5.090 1.555 0.209 0.071 0.088 1.156 0.788
20 4.894 1.531 0.199 0.064 0.077 1.114 0.774
21 4.892 1.535 0.202 0.069 0.079 1.134 0.784
22 4.995 1.582 0.194 0.067 0.080 1.091 0.750
23 4.596 1.356 0.201 0.068 0.051 1.089 0.769
24 4.852 1.524 0.202 0.068 0.052 1.090 0.768
25 5.053 1.588 0.201 0.068 0.051 1.089 0.769
26 4.978 1.459 0.196 0.070 0.064 1.090 0.760
27 5.055 1.517 0.201 0.057 0.064 1.128 0.806
28 4.764 1.465 0.184 0.060 0.060 1.032 0.728
29 4.552 1.484 0.179 0.055 0.061 1.042 0.747
30 4.572 1.473 0.206 0.050 0.049 1.083 0.778
31 4.671 1.483 0.207 0.051 0.050 1.084 0.776
1
Total 157.75 49.18 6.90 1.86 2.00 35.05 24.29
Avg. 5.089 1.586 0.223 0.060 0.064 1.131 0.784

NOTES:

2008 FLOWMETERS

2012 APRIL 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT GPD NET FLOWS
0.3004/01/1220,4000
0.0004/02/122,486,9041,050,00023,913,021196,06012,034,68749,18013,583,57447,59020,400757,170
0.0004/03/122,487,9651,061,00023,932,468194,47012,039,51248,25013,590,25166,77020,400751,510
0.0004/04/122,489,0371,072,00023,951,666191,98012,044,83053,18013,596,85366,02020,400760,820
0.0004/05/122,490,0931,056,00023,970,966193,00012,050,23954,09013,602,54456,91020,400752,000
0.0004/06/1220,4000
0.0004/07/1220,4000
0.0004/08/1220,4000
0.0004/09/122,494,2321,034,75024,048,073192,76812,068,44645,51813,620,27844,33520,400752,130
0.0004/10/122,495,3671,135,00024,066,781187,08012,074,11956,73013,626,95866,80020,400824,390
0.0004/11/1220,4000
0.0004/12/122,497,4661,049,50024,102,910180,64512,083,23945,60013,639,19661,19020,400762,065
0.0004/13/122,498,5021,036,00024,120,720178,10012,087,39441,55013,644,95157,55020,400758,800
0.0004/14/1220,4000
0.0304/15/1220,4000
0.0004/16/122,501,6131,037,00024,174,935180,71712,104,51757,07713,658,16844,05720,400755,150
0.0004/17/122,502,6821,069,00024,192,537176,02012,110,69261,75013,665,34971,81020,400759,420
0.0804/18/122,503,7161,034,00024,209,539170,02012,116,30256,10013,671,84364,94020,400742,940
0.0004/19/122,504,7351,019,00024,226,547170,08012,122,14058,38013,677,43155,88020,400734,660
0.0004/20/122,505,7751,040,00024,243,605170,58012,128,24661,06013,682,94955,18020,400753,180
0.5004/21/1220,4000
2.0004/22/1220,4000
0.0004/23/122,509,2971,174,00024,304,695203,63312,147,09962,84313,698,33551,28720,400856,237
0.0004/24/122,510,4871,190,00024,326,949222,54012,151,61745,18013,704,68163,46020,400858,820
0.0004/25/1220,4000
0.1004/26/1220,4000
0.0004/27/1220,4000
0.0004/28/1220,4000
0.0004/29/1220,4000
0.0004/30/122,516,8421,059,16724,429,933171,64012,185,90957,15313,733,16147,46720,400782,907
3.011,069,776186,20853,35357,57820,400826,828
Metric E.GOSHEN
MONTH TO DATE3.01
NORMAL MONTH TO DATE
YEAR TO DATE8.70
NORMAL YEAR TO DATE

2012 flowmeters -all-stations separate month worksheets.004.xlsAPR
5/2/2012 9:33 AM

2008 FLOWMETERS

2012 APRIL 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

DATE HERSHEY'S MILL READING HERSHEY'S MILL GPD ASHBRIDGE READING ASHBRIDGE GPD HICKS METER READING HICKS METER GPD RESERVOIR READING RESERVOIR GPD SHERMAN READING SHERMAN GPD BARKWAY READING BARKWAY GPD
04/01/12
04/02/124,824,716273,407
04/03/1223,223,51157,1121,399,82663,9404,854,370296,540780,6585,6702,361,4459,848
04/04/124,882,923285,530
04/05/1223,238,47874,8351,401,00458,9004,910,838279,150781,7275,3452,363,2438,990
04/06/12
04/07/12
04/08/12
04/09/125,001,713227,188
04/10/1223,263,30349,6501,404,18363,5805,033,933322,200785,3847,3142,368,69110,896
04/11/12
04/12/1223,274,61056,5351,405,42562,1005,091,157286,120786,7606,8802,370,84410,765
04/13/125,120,632294,750
04/14/12
04/15/12
04/16/125,196,067251,450
04/17/125,226,582305,150
04/18/125,255,766291,840
04/19/1223,313,78355,9611,409,73861,6145,284,830290,640791,2466,4092,378,24010,566
04/20/125,314,247294,170
04/21/12
04/22/12
04/23/125,398,177279,767
04/24/125,430,052318,750
04/25/12
04/26/1223,355,66259,8271,414,63970,014796,0226,8232,385,77510,764
04/27/12
04/28/12
04/29/12
04/30/125,592,938271,477155,449,2454,855,425
58,98763,358285,508285,6136,40710,305

2012 flowmeters -all-stations separate month worksheets.004.xlsAPR
5/2/2012 9:33 AM

Flowmeters April 2012

[Line chart showing daily flowmeter readings for April 2012.]

Y-Axis (Flow's): 1000000, 900000, 800000, 700000, 600000, 500000, 400000, 300000, 200000, 100000, 0

X-Axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30

Legend: April

Monthly Totals 2012 Jan-Dec

[Bar chart showing daily flowmeter totals by month from January through April 2012, with May through December empty.]

Y-Axis (Flowmeters): 1400000, 1200000, 1000000, 800000, 600000, 400000, 200000, 0

X-Axis (Month): January, February, March, April, May, June, July, August, September, October, November, December

April Precip. 3.01 - 2012

[Bar chart showing daily precipitation in inches for April 2012.]

Y-Axis (Precip.): 2, 1.8, 1.6, 1.4, 1.2, 1, 0.8, 0.6, 0.4, 0.2, 0

X-Axis (snow/rain): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31

Legend: April

2012 Monthly Precipitation

[Bar chart showing monthly precipitation totals for January through April 2012, with May through December at 0.]

Y-Axis: 3.5, 3, 2.5, 2, 1.5, 1, 0.5, 0

X-Axis: January, February, March, April, May, June, July, August, September, October, November, December

Legend: Series1