Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
October 8, 2012
Monday 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
  3. APPROVAL OF MINUTES September 10, 2012
  4. APPROVAL OF INVOICES Pennoni #521184      $ 6,770.50; Pennoni #521185      $ 1,164.75; Pennoni #521186      $ 996.25; Pennoni #521187      $ 1,142.00; Pennoni #521188      $ 140.00; Pennoni #521189      $ 1,499.00; Pennoni #521190      $ 418.00; Gawthrop Greenwood,PC #101835      $ 475.00
  5. LIAISON REPORTS
  6. FINANCIAL REPORTS September 2012 Report
  7. OLD BUSINESS
  8. GOALS September Goals
  9. NEW BUSINESS Replace Electrical Disconnects Memo
  10. CAPACITY REQUESTS
  11. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc Report with DMR’s; East Goshen Township Flows for September 2012
  12. ANY OTHER MATTER Scott Towler Phosphorus Report

F:\Data\Shared Data\Agendas\Municipal Authority\2012\10-08-2012 .doc

  1. CORRESPONDENCE AND REPORTS OF INTEREST
  2. PUBLIC COMMENT
  3. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Website Posting Date

F:\Data\Shared Data\Agendas\Municipal Authority\2012\10-08-2012 .doc

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
September 10, 2012

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, September 10, 2012 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Dana Pizarro, Vice Chairman Fran Beck, Jack Yahraes, Joe McCawley and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Dan Barbato (Pennoni), Bob Adams, and Walter Wujick (Conservancy Board).

COMMON ACRONYMS:

MA- Municipal Authority I&I – Inflow & Infiltration
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant
CB – Conservancy Board DEP – Department of Environmental Protection
PR – Park & Recreation Board EPA – Environmental protection Agency
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
SSO – Sanitary System Overflow WAS – Waste Activated Sludge
BFES – Big Fish Environmental Services

Call to Order & Pledge of Allegiance

Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Dana asked if anyone would be recording the meeting and there was no response.

Chairman's Report

Dana attended the West Goshen Sewer Authority meeting. The federal court filings are being prepared. There is a meeting scheduled with DEP for September 25, 2012. The comment letter in response to the draft permit was submitted to the PADEP. If the year 9 TMDL remains in the final permit, an EHB appeal will be necessary. The Goose Creek Stream study/TMDL permit issues are continuing. They want to have TMDL at Goose Creek removed entirely.

Dana attended the PMAA meeting. He reported that senate Bill 375 was signed which covers how authorities should spend money and where it should be allocated. (Inkind services and donations can’t exceed $1,000/year). He reported on several other bills that were passed.

Approval of Minutes

The Chairman noted that the minutes of the August 13, 2012 meeting were approved as corrected.

Approval of Invoices

  1. Joe moved to approve payment of 5 Pennoni invoices: #517331 $ 716.50 #517332 $ 6,890.75 #517333 $ 258.00 #517334 $ 190.50 #517336 $ 3,966.00

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 09-10-12 draft.doc
1

Fran seconded the motion. The motion passed unanimously.

  1. Fran moved to approve payment of the SJM invoice: #App #3 $13,632.57 Dan commented that there is only some seeding still to be done. Jack seconded the motion. The motion passed unanimously. Jack commented that they were very pleased with SJM’s work. There were no complaints. Rick will send a letter to SJM.

Liaison Reports

  1. Conservancy Board – Walter reported that the Board is starting to plan for plantings along E. Boot Road. The Board reviewed plans provided by Goshen Meadows but did not make a recommendation because there was no landscaping plan and a discrepancy between the numbers on 2 reports.

Financial Reports

  1. Jon Altshul, CFO, provided reports with the following comment: total expenses were $66,584.27 compared with total revenue of $100,010.99 (primarily due to a $100,000 transfer from the sewer capital reserve fund) for a net change in fund balance of $33,426.72.

Old Business

None

Goals

  1. Newsletter – Joe will do an article for the next Newsletter.
  2. The RCSTP tour will be held on Saturday, Oct. 20, 2012 from 10:00 am to Noon. Mark will take care of handouts. Dan will make flow diagrams.

New Business

None

Capacity Requests

None

Sewer Reports

  1. Mark Miller, Director of Public Works , provided the following report for August: Meters - Have been read on a daily basis. The meter for Westtown Way stopped operating. Allied Control was called to make repairs. Allied Control said that the unit was not worth fixing and gave us a quote for a new meter ($3,460.00). I contacted John Scott from West Goshen who agreed with replacing the meter. Pumping Stations : Were visited on a routine basis, no problems to report. CC Collection : Replaced several sewer caps during the month and were notified of one lateral clog which was cleared. The sewer right-of-ways were mowed and the manholes were inspected between Wilson Dr. and Strasburg Road. RC Collection : No problems to report. RC Plant : Routine maintenance was performed during the month.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 09-10-12 draft.doc
2

Lockwood Plant: We are waiting on PECO to turn off power and remove the transformers.
Alarms: We responded to 17 alarms during the month ranging from generators running to a high level alarm. All alarms were cleared and all stations put back in service.
PA One Calls: We received 133 PA One calls for the month of August.

  1. Dan Barbato, Pennoni, provided the engineer’s report: Invoices : Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP) – No activity this period. We will assist with supporting and reviewing warranty claims, plant troubleshooting and operations support as requested. LCSTP Elimination The contractor has installed lot pins at two property corners between 920 and 922 Dolphin Drive and submitted as-built plans. All contract work is complete. The contract close-out documents (Contractor’s Release and Statement of Surety) have also been submitted. A 2-year Maintenance Bond was provided at the start of the project. The Municipal Authority will verify that the lot pins were set and Pennoni is reviewing the as-built plans submitted by the contractor. Hershey’s Mill PS Diversion & Reserve PD Elimination We submitted the Reserve PS and the Hershey’s Mill PS GP-5 “General Permit for Utility Line Stream Crossing” applications to DEP on June 27 and June 22 respectively. DEP has reviewed the Reserve PS application and has verbally informed us that we need to set up a bog turtle screening by the Army Corps of Engineers (ACOE). We have contacted the ACOE to set up the screening and are awaiting a response. We are still awaiting DEP’s review of the Hershey’s Mill PS application. We received comments from the Chester CO. Conservation District (CCCD) on the Erosion and Sediment Pollution Control Plan submissions for both projects. We revised the plans and made formal resubmissions to the CCCD. The revised plans were informally approved by CCCD via email prior to formal resubmission. We are awaiting formal approval. We prepared 4 Draft sanitary sewer easement legal descriptions and exhibits for the diversion project – 1 for the Hershey’s Mill PS and 3 for the Reserve PS. The Draft documents were forwarded to the Township for review and comment. We recommend rock borings be performed along the alignment of both projects prior to bidding to determine if rock will be encountered during the work. Recommended boring locations were previously forwarded to the township. Marydell PS Elimination - We submitted the PennDOT HOP application for the sewer construction and the permit has been issued. The permit provides for a jack & bore (trenchless) installation across Boot Road and open-cut trenching for the remainder of the work. The Paoli Pike crossing at Saratoga Drive is proposed to occur at night with a full road closure and detour. The Pump Station Closure Plan was submitted to DEP on July 31, 2012, and we are awaiting DEP’s review.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 09-10-12 draft.doc
3

A small additional easement will be required from the shopping center for the proposed sewer, and we will prepare an easement legal description and exhibit if/when the shopping center owner and Township work out terms of the easement.
Once the easement is obtained and the Pump Station Closure Plan is approved, all third party approvals and permits will be in place, and the project can be put out to bid. We anticipate putting the project out to bid in the winter so that construction can commence in early spring.
Hershey’s Mill Muffin Monster
We finalized the mechanical and electrical plans and submitted them to DEP on August 16, 2012. We requested feedback from DEP within 60 days.
Once DEP approves the plans, we will coordinate with the Muffin Monster supplier to obtain formal product pricing.
Semi-Annual Sewer System (Formerly “CO&A”) Status Report
We have begun to analyze portable and permanent meter data from January-July 2012 for preparation of the internal semi-annual sewer system status report. This will be the first internal-only report since the semi-annual CO&A submissions to DEP were no longer required. The report format and content is intended to be similar to that in the previous CO&A reports. We will submit the report to the Township by September 30, 2012.

  1. Big Fish Environmental Services, Inc., Scott Towler presented the following written report: Treatment Process Operation Sequencing batch reactors (SBRs) numbered 1, 3, & 4 were in service during the month of August. SBR No. 2 remains out of service with approximately a mixture of 1 foot of sludge and rainwater within the tank. Transfer of the contents of SBR2 is planned during September. During the month of July, there were a total of 3 exceedances of the final effluent discharge limitations for total phosphorus. Two (2) exceedances were reported for outfall 011 and one (1) for outfall 002 (Applebrook). Available final effluent total phosphorus concentrations for samples collected during August exceed the effluent discharge limitation. Adjustments to the SBR process during August include increasing the mixed liquor concentration (MLSS), increasing the sludge age and decreasing the food to mass ratio (F:M ratio). The objective of the process adjustments is to restore biological phosphorus removal and prepare for the autumn and winter operations. Grab samples from the final effluent flow equalization basin and final effluent discharge were routinely analyzed (daily Monday through Friday) for pH, Alkalinity and total phosphorus was implemented for the final effluent flow equalization basin and final effluent discharge. The process adjustments indicate the final effluent total phosphorus concentration was trending downward towards the discharge limitation concentration. Daily process monitoring of the final effluent and SBRs will continue to monitor improvement towards achieving consistent total phosphorus concentrations compliant with the discharge limitation. Solids Dewatering and Disposal During August, the centrifuge dewatering system was placed in service. A summary of the solids processing activity is provided.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 09-10-12 draft.doc
4

During the month, sludge wasting and decanting of the sludge holding tanks was ongoing. A total volume of 103,425 gallons of supernatant was decanted from the sludge holding tanks. pH and alkalinity were monitored on average twice per week and total solids once per week.
Sludge holding tank #1 began the month as 0.90% total solids and ended the month at 0.66% total solids. Tank level at the beginning of the month was 10.72 ft. and at the end of the month was 4.52 ft.
Sludge holding tank #2 began the month as 0.87% total solids and ended the month at 1.08% total solids. Tank level at the beginning of the month was 11.22 ft. and at the end of the month was 14.56 ft.

Maintenance, Repairs and Warranty
Outstanding: centrifuge replacement parts – Worth & Co. to replace parts used for warranty repair.
Action: BFESI will provide Worth & Co a letter requesting resolution of the matter on or before Oct. 1, 2012.
Outstanding: SBR and Centrifuge MCC panel hour meters – Worth & Co informed
Action: Pennoni Assocs/township to provide Worth & Co. a copy of the short circuit study completed by Clinger Corp.
Outstanding: Screen Building overhead door.
Action: Worth & CO will be contacted to investigate the malfunctioning door.
Scheduled Maintenance/Repairs
Tightened the drive belts for SBR No 1 blower.
Removed the intake exhaust screen and tightened the belt for the SBR blower room exhaust fan.
Replaced the dissolved oxygen probe on SBR No4 with the dissolved oxygen probe from SBR No2.
Flushed the chemical feed piping from chemical fee pumps MP-33 and MP-34 to SBRs 1, 3 and 4.
Repaired broken utility water supply piping to the fine screen.

The letter to Dave Wolfinger, DEP, from Scott Towler, BFES, was reviewed by the Authority. The Authority is concerned about the phosphorus problem. Kevin wants to be notified immediately of any exceedance, and, in the monthly report, he would like to have the reason for any exceedances.

Any Other Matter

  1. The DEP Stream Report was reviewed. Rick commented that the DEP stream report is left over from Miller. We don’t know yet what will need to be done. Jack asked about the 5 fingers. Mark explained that the 5 fingers are working. The problem is after that.

Correspondence and Reports of Interest – Dana acknowledged correspondence that was received.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 09-10-12 draft.doc
5

Public Comment – None

Adjournment

There being no further business, Joe moved to adjourn the meeting. Jack seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 09-10-12 draft.doc
6

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521184
Invoice Date : 09/26/2012
Project : EGMA1107
Project Name : HersheyMill &Reserve PS Div Des Per

For Services Rendered through: 09/16/2012

Revised and re-issued Hershey Mill PS Diversion (HMPS) and Reserve PS (RPS) E&S Plans and response letters to address CCCD comments, correspondence with DEP regarding bog turtle screening for RPS General Permit GP-5, prepared HMPS WQM Permit Amendment; prepared easement exhibits and legal descriptions for HMPS and RPS including property research.

Phase : 1 -- Design

Total Phase : 1 -- Design Labor : 3,662.75
Expense : 0.00
Phase Total : 3,662.75

Phase : 2 -- Sewer Stakeout and Easements

Total Phase : 2 -- Sewer Stakeout and Easements Labor : 1,985.50
Expense : 0.00
Phase Total : 1,985.50

Phase : 3 -- Property Boundary Survey Allocation

Total Phase : 3 -- Property Boundary Survey Allocation Labor : 504.00
Expense : 0.00
Phase Total : 504.00

Phase : 4 -- E&SPC Permitting

Total Phase : 4 -- E&SPC Permitting Labor : 157.50
Expense : 0.00
Phase Total : 157.50

Phase : 5 -- Water Quality Mgmt Part 2 Permit

Total Phase : 5 -- Water Quality Mgmt Part 2 Permit Labor : 460.75
Expense : 0.00
Phase Total : 460.75
Amount Due This Invoice $6,770.50

[signature]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Invoice # : 521184

...Continued from previous page

Fee : 60,200.00
Prior Billings : 23,376.00
Current Billings : 6,770.50
Total Billings : 30,146.50

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 2
Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Invoice # : 521184

...Continued from previous page

Phase : 1 -- Design

Labor

Class Hours/
Units
Rate Amount
Authority Engineer 0.50 110.00 55.00
Project Engineer 13.25 93.00 1,232.25
Associate Engineer 1.00 83.00 83.00
Graduate Engineer 32.75 70.00 2,292.50
Labor Total: 47.50 3,662.75
Total Phase : 1 -- Design Labor : $3,662.75
Expense : $0.00

Phase : 2 -- Sewer Stakeout and Easements

Labor

Class Hours/
Units
Rate Amount
Project Engineer 1.50 93.00 139.50
Senior Surveyor 8.50 87.00 739.50
Engineering Technician II 15.00 72.00 1,080.00
Survey Technician 0.50 53.00 26.50
Labor Total: 25.50 1,985.50
Total Phase : 2 -- Sewer Stakeout and Easements Labor : $1,985.50
Expense : $0.00

Phase : 3 -- Property Boundary Survey Allocation

Labor

Class Hours/
Units
Rate Amount
Engineering Technician II 7.00 72.00 504.00
Labor Total: 7.00 504.00
Total Phase : 3 -- Property Boundary Survey Allocation Labor : $504.00
Expense : $0.00

Phase : 4 -- E&SPC Permitting

Labor

Class Hours/
Units
Rate Amount
Graduate Engineer 2.25 70.00 157.50
Labor Total: 2.25 157.50
Total Phase : 4 -- E&SPC Permitting Labor : $157.50
Expense : $0.00

Phase : 5 -- Water Quality Mgmt Part 2 Permit

Labor

Class Hours/
Units
Rate Amount
Project Engineer 0.25 93.00 23.25

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 3
Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Invoice # : 521184

...Continued from previous page

Phase : 5 -- Water Quality Mgmt Part 2 Permit

Labor

Class Hours/
Units
Rate Amount
Graduate Engineer 6.25 70.00 437.50
Labor Total: 6.50 460.75
Total Phase : 5 -- Water Quality Mgmt Part 2 Permit Labor : $460.75
Expense : $0.00
Total Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Labor : $6,770.50
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 4

East Goshen Municipal Authority
EGMA1107 Invoice Summary
Invoice Date 9/26/2012

Project: EGMA1107
Pennoni Job No.: Hershey Mill & Reserve PS Div Des Per
Invoice No: 521184
Invoice Period: 8/13/2012 to 9/16/2012
Initial Authorization: $ 60,200.00 Date: 7/7/2011
Contract Amount: $ 60,200.00
Previously Invoiced: $ 23,376.00
Current Invoice: $ 6,770.50
Invoiced to Date ($): $ 30,146.50
Invoiced to Date (%): 50%
Remaining Budget ($): $ 30,053.50
Remaining Budget (%): 50%

Budget by Phase:

Phase No. ****
Phase Name: Hershey Mill & Reserve
Phase Budget: $ 60,200.00
Previously Invoiced: $ 23,376.00
Current Invoice: $ 6,770.50
Invoiced to Date ($): $ 30,146.50
Invoiced to Date (%): 50%
Remaining Budget ($): $ 30,053.50
Remaining Budget (%): 50%

Comments: Revised and re-issued Hershey Mill PS Diversion (HMPS) and Reserve PS (RPS) E&S Plans and response letters to address CCCD comments, correspondence with DEP regarding bog turtle screening for RPS General Permit GP-5, prepared HMPS WQM Permit Amendment; prepared easement exhibits and legal descriptions and legal descriptions for HMPS and RPS including property research.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521185
Invoice Date : 09/26/2012
Project : EGMA1109
Project Name : Marydell Pump Station Diversion

For Services Rendered through: 09/16/2012

Reviewed Chester County Planning Commission Consistency Letter, prepared easement exhibits and legal descriptions. HOP permit issuance and plan revisions to incorporate HOP requirements.

Phase : 1 -- Design

Total Phase : 1 -- Design Labor : 116.25
Expense : 0.00
Phase Total : 116.25

Phase : 2 -- Sewer Stakeout and Easements

Total Phase : 2 -- Sewer Stakeout and Easements Labor : 630.00
Expense : 0.00
Phase Total : 630.00

Phase : 4 -- PennDOT Highway Occupancy Permits

Total Phase : 4 -- PennDOT Highway Occupancy Permits Labor : 418.50
Expense : 0.00
Phase Total : 418.50
Fee : 45,100.00 Amount Due This Invoice $1,164.75
Prior Billings : 16,391.00
Current Billings : 1,164.75
Total Billings : 17,555.75

ok
[signature]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1109 -- Marydell Pump Station Diversion Invoice # : 521185

...Continued from previous page

Phase : 1 -- Design

Labor

Class Hours/
Units
Rate Amount
Project Engineer 1.25 93.00 116.25
Labor Total: 1.25 116.25
Total Phase : 1 -- Design Labor : $116.25
Expense : $0.00

Phase : 2 -- Sewer Stakeout and Easements

Labor

Class Hours/
Units
Rate Amount
Project Engineer 1.25 93.00 116.25
Senior Surveyor 2.25 87.00 195.75
Survey Technician 6.00 53.00 318.00
Labor Total: 9.50 630.00
Total Phase : 2 -- Sewer Stakeout and Easements Labor : $630.00
Expense : $0.00

Phase : 4 -- PennDOT Highway Occupancy Permits

Labor

Class Hours/
Units
Rate Amount
Project Engineer 4.50 93.00 418.50
Labor Total: 4.50 418.50
Total Phase : 4 -- PennDOT Highway Occupancy Permits Labor : $418.50
Expense : $0.00
Total Project : EGMA1109 -- Marydell Pump Station Diversion Labor : $1,164.75
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 2

East Goshen Municipal Authority
EGMA 1109 Invoice Summary
Invoice Date 9/26/2012

Project: EGMA1109
Pennoni Job No.: Marydell Pump Station Diversion
Invoice No: 521185
Invoice Period: 8/13/2012 to 9/16/2012
Initial Authorization: $ 45,100.00 Date: 2/22/2012
Contract Amount: $ 45,100.00
Previously Invoiced: $ 16,391.00
Current Invoice: $ 1,164.75
Invoiced to Date ($): $ 17,555.75
Invoiced to Date (%): 39%
Remaining Budget ($): $ 27,544.25
Remaining Budget (%): 61%

Budget by Phase:

Phase No. ****
Phase Name: Marydell Pump Station Diversion
Phase Budget: $ 45,100.00
Previously Invoiced: $ 16,391.00
Current Invoice: $ 1,164.75
Invoiced to Date ($): $ 17,555.75
Invoiced to Date (%): 39%
Remaining Budget ($): $ 27,544.25
Remaining Budget (%): 61%

Comments: Reviewed Chester County Planning Commission Consistency Letter, prepared easement exhibits and legal descriptions
HOP permit issuance and plan revisions to incorporate HOP requirements.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521186
Invoice Date : 09/26/2012
Project : EGMA1201
Project Name : 2012 General Services

For Services Rendered through: 09/16/2012

Review August MA meeting packet and attend meeting. Follow up on request to verify report transmittals to S. Towler. September monthly report and attendance at September MA meeting.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 996.25
Expense : 0.00
Phase Total : 996.25
Fee : 10,000.00 Amount Due This Invoice $996.25
Prior Billings : 3,845.25
Current Billings : 996.25
Total Billings : 4,841.50

Phase : **** -- Professional Services

Labor

Class Hours/
Units
Rate Amount
Authority Engineer 8.00 110.00 880.00
Project Engineer 1.25 93.00 116.25
Labor Total: 9.25 996.25
Total Phase : **** -- Professional Services Labor : $996.25
Expense : $0.00
Total Project : EGMA1201 -- 2012 General Services Labor : $996.25
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1201 Invoice Summary
Invoice Date 9/26/2012

Project: EGMA1201
Pennoni Job No.: 2012 General Services
Invoice No: 521186
Invoice Period: 8/13/2012 to 9/16/2012
Initial Authorization: $ 10,000.00 Date: 2/22/2012
Contract Amount: $ 10,000.00
Previously Invoiced: $ 3,845.25
Current Invoice: $ 996.25
Invoiced to Date ($): $ 4,841.50
Invoiced to Date (%): 48%
Remaining Budget ($): $ 5,158.50
Remaining Budget (%): 52%

Budget by Phase:

Phase No. ****
Phase Name: 2012 General Services
Phase Budget: $ 10,000.00
Previously Invoiced: $ 3,845.25
Current Invoice: $ 996.25
Invoiced to Date ($): $ 4,841.50
Invoiced to Date (%): 48%
Remaining Budget ($): $ 5,158.50
Remaining Budget (%): 52%

Comments: Review August MA meeting packet and attend meeting. Follow up on request to verify report transmittals to S. Towler. September monthly report and attendance at September MA meeting.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521187
Invoice Date : 09/26/2012
Project : EGMA1202
Project Name : 2012 COA and I&I Reports

For Services Rendered through: 09/16/2012

Analysis of permanent and temporary (portable) meter data.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,142.00
Expense : 0.00
Phase Total : 1,142.00
Fee : 13,000.00 Amount Due This Invoice $1,142.00
Prior Billings : 4,595.00
Current Billings : 1,142.00
Total Billings : 5,737.00

Phase : **** -- Professional Services

Labor

Class Hours/
Units
Rate Amount
Authority Engineer 1.00 110.00 110.00
Project Engineer 1.50 93.00 139.50
Graduate Engineer 12.75 70.00 892.50
Labor Total: 15.25 1,142.00
Total Phase : **** -- Professional Services Labor : $1,142.00
Expense : $0.00
Total Project : EGMA1202 -- 2012 COA and I&I Reports Labor : $1,142.00
Expense : $0.00

[signature]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1202 Invoice Summary
Incvoice Date 9/26/2012

Project: EGMA1202
Pennoni Job No.: 2012 COA and I&I Reports
Invoice No: 521187
Invoice Period: 3/19/2012 to 8/16/2012
Initial Authorization: $ 13,000.00 Date: 2/22/2012
Contract Amount: $ 13,000.00
Previously Invoiced: $ 4,595.00
Current Invoice: $ 1,142.00
Invoiced to Date ($): $ 5,737.00
Invoiced to Date (%): 44%
Remaining Budget ($): $ 7,263.00
Remaining Budget (%): 56%

Budget by Phase:

Phase No. ****
Phase Name: 2012 COA and I&I Reports
Phase Budget: $ 13,000.00
Previously Invoiced: $ 4,595.00
Current Invoice: $ 1,142.00
Invoiced to Date ($): $ 5,737.00
Invoiced to Date (%): 44%
Remaining Budget ($): $ 7,263.00
Remaining Budget (%): 56%

Comments: Analysis of permanent and temporary (portable) meter data.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521188
Invoice Date : 09/26/2012
Project : EGMA1203
Project Name : 2011 Chapter 94

For Services Rendered through: 09/16/2012

Finalize and issue comment response letter to DEP for Westtown Chp. 94 Report.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 140.00
Expense : 0.00
Phase Total : 140.00
Fee : 14,000.00 Amount Due This Invoice $140.00
Prior Billings : 13,858.25
Current Billings : 140.00
Total Billings : 13,998.25

Phase : **** -- Professional Services

Labor

Class Hours/
Units
Rate Amount
Graduate Engineer 2.00 70.00 140.00
Labor Total: 2.00 140.00
Total Phase : **** -- Professional Services Labor : $140.00
Expense : $0.00
Total Project : EGMA1203 -- 2011 Chapter 94 Labor : $140.00
Expense : $0.00

ok
[signature]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1203 Invoice Summary
Invoice Date 9/26/2012

Project: EGMA1203
Pennoni Job No.: 2011 Chapter 94
Invoice No: 521188
Invoice Period: 8/13/2012 to 09/16/2012
Initial Authorization: $ 14,000.00 Date: 2/22/2012
Contract Amount: $ 14,000.00
Previously Invoiced: $ 13,858.25
Current Invoice: $ 140.00
Invoiced to Date ($): $ 13,998.25
Invoiced to Date (%): 100%
Remaining Budget ($): $ 1.75
Remaining Budget (%): 0%

Budget by Phase:

Phase No. ****
Phase Name: 2011 Chapter 94
Phase Budget: $ 14,000.00
Previously Invoiced: $ 13,858.25
Current Invoice: $ 140.00
Invoiced to Date ($): $ 13,998.25
Invoiced to Date (%): 100%
Remaining Budget ($): $ 1.75
Remaining Budget (%): 0%

Comments: Finalize and issue comment response letter to DEP for Westtown Chp. 94 Report.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521189
Invoice Date : 09/26/2012
Project : EGMA1206
Project Name : Hershey Mill PS Muffin Monster Desi

For Services Rendered through: 09/16/2012

Finalize mechanical and electrical construction plans, prepare and issue DEP submission package, obtain DEP approval, coordinate with vendor to obtain price quotation.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,499.00
Expense : 0.00
Phase Total : 1,499.00
Fee : 12,000.00 Amount Due This Invoice $1,499.00
Prior Billings : 5,427.30
Current Billings : 1,499.00
Total Billings : 6,926.30

Phase : **** -- Professional Services

Labor

Class Hours/
Units
Rate Amount
Project Engineer 6.50 93.00 604.50
Engineering Technician II 1.00 72.00 72.00
Graduate Engineer 11.75 70.00 822.50
Labor Total: 19.25 1,499.00
Total Phase : **** -- Professional Services Labor : $1,499.00
Expense : $0.00
Total Project : EGMA1206 -- Hershey Mill PS Muffin Monster Desi Labor : $1,499.00
Expense : $0.00

ok
[signature]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1206 Invoice Summary
Invoice Date 9/26/2012

Project: EGMA1206
Pennoni Job No.: Hershey Mill PS Muffin Monster Design
Invoice No: 521189
Invoice Period: 8/13/2012 to 9/16/2012
Initial Authorization: $ 12,000.00 Date: 5/15/2012
Contract Amount: $ 12,000.00
Previously Invoiced: $ 5,427.30
Current Invoice: $ 1,499.00
Invoiced to Date ($): $ 6,926.30
Invoiced to Date (%): 58%
Remaining Budget ($): $ 5,073.70
Remaining Budget (%): 42%

Budget by Phase:

Phase No. ****
Phase Name: Muffin Monster Design
Phase Budget: $ 12,000.00
Previously Invoiced: $ 5,427.30
Current Invoice: $ 1,499.00
Invoiced to Date ($): $ 6,926.30
Invoiced to Date (%): 58%
Remaining Budget ($): $ 5,073.70
Remaining Budget (%): 42%

Comments: Finalize mechanical and electrical construction plans, prepare and issue DEP submission package, obtain DEP approval, coordinate with vendor to obtain price quotation.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 521190
Invoice Date : 09/26/2012
Project : EGOS1202
Project Name : MS4 submission

For Services Rendered through: 09/16/2012

Finalized and submitted MS4 Permit Renewal Application, including outfall mapping, to DEP; meeting with Township Manager to obtain signatures and mapping.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 418.00
Expense : 0.00
Phase Total : 418.00
Fee : 2,750.00 Amount Due This Invoice $418.00
Prior Billings : 400.00
Current Billings : 418.00
Total Billings : 818.00

Phase : **** -- Professional Services

Labor

Class Hours/
Units
Rate Amount
Engineering Technician II 4.00 72.00 288.00
Engineering Technician I 2.00 65.00 130.00
Labor Total: 6.00 418.00
Total Phase : **** -- Professional Services Labor : $418.00
Expense : $0.00
Total Project : EGOS1202 -- MS4 submission Labor : $418.00
Expense : $0.00

ok
[signature]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

G Gawthrop Greenwood, PC
Attorneys at Law

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
08/31/2012
Client No: 6604-01M
Invoice No. 101835

General Authority Services

Fees

Date / Ref Description Hours Amount
08/13/2012
RFA
Review packet for Authority meeting of 8/13; attend regular meeting of Municipal Authority. 1.50
08/31/2012
RFA
Review message from M Ellis with contract closeout documents; review contract bond, contractor's release and settlement of surety company; Message to R Smith regarding closeout documents. 1.00
For Current Services Rendered 2.50 475.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.50 $190.00 $475.00
Previous Balance $475.00
Total Current Charges 475.00
08/16/2012 Fee Payment -475.00
Balance Due $475.00

ok RCS 9/11/12

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Jon Altshul
Re: September 2012 Financial Report
Date: October 5, 2012

Attached please find the August Financial Report for the Municipal Authority. Total expenses were $34,579.06 compared with total revenue of $5.58, for a net change in fund balance of -$34,573.48. Note that the beginning fund balance of $85,706.46 is about $4 less than the ending fund balance that was reported to you last month, due to a double posting of interest income at the end of last month that has now been corrected.

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
SEPTEMBER 2012

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 85,706.46 *
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 0.00 3.22 67.02
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 0.00 3.22 67.02
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 1,228.08
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00
TOTAL EXPENSES 0.00 0.00 1,228.08
RCSTP NET RESULT 0.00 3.22 (1,161.06)

U:\bmccool\2012\Municipal Authority\2012 - 09 Financial Report.xlsx Page 1 of 3 09/04/2012

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
SEPTEMBER 2012

8,840.44
Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS 07341 1000 0.00 2.36 32.57
C.C. TAPPING FEES 07364 1100 2,000.00 0.00 0.00
R.C.TAPPING FEES 07364 1110 2,000.00 0.00 4,000.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 845.64
MISCELLANEOUS REVENUE 07380 1000 1,000.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 125,000.00 0.00 30,700.00
TOTAL REVENUE 130,000.00 2.36 36,001.57
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 37,669.00 8,391.94 25,175.82
MISCELLANEOUS EXPENSE 07424 3000 4,162.00 0.00 950.00
MUNIC.AUTH.-AUDITING 07424 3110 8,843.00 0.00 7,900.00
ENGINEERING SERVICES 07424 3130 37,066.00 448.50 23,426.00
LEGAL SERVICES 07424 3140 12,485.00 0.00 4,770.68
M.C.-DVRFA-DEBT SERVICE 07471 1000 19,600.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 6,981.00 0.00 0.00
TOTAL EXPENSES 126,806.0062,222.50
OPERATING NET RESULT 3,194.00 (8,838.08) (26,220.93)

U:\bmccool\2012\Municipal Authority\2012 - 09 Financial Report.xlsx Page 2 of 3 09/04/2012

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
SEPTEMBER 2012

400,000.00
Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07392 0804 0.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 828,000.00 0.00
TOTAL REVENUE 828,000.00 0.00 400,000.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 51,764.00 6,890.75 14,226.75
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 170,000.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 37,553.00 3,985.80 42,093.30
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 411,000.00 14,045.57 177,281.48
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 100.00 104,504.99
HERSHEY MILL STATION - ENGINEER 07426 1000 29,069.00 0.00 13,039.75
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 46,000.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 29,069.00 358.25 8,590.00
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 93,000.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 0.00 358.25 358.25
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
TOTAL EXPENSES 867,455.00 25,738.62 360,094.52
CAPITAL NET RESULT (39,455.00) (25,738.62) 39,905.48
MUNICIPAL AUTHORITY ENDING FUND BALANCE 51,132.98

*The September Beginning Fund Balance is $4.19 less than the August Ending Fund Balance due to two transactions entered to reverse duplicate entries that were posted to interest GL accounts.

U:\bmccool\2012\Municipal Authority\2012 - 09 Financial Report.xlsx Page 3 of 3 09/04/2012

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1201 JE 31221 0.62 02/07/12 INTEREST INTEREST EARNED JAN. 2012
7100.1000
0.00 0.62 -0.62
1202 31655 0.25 03/14/12 INTEREST INTEREST EARNED FEB. 2012
7100.1000
0.00 0.25 -0.87
1203 31930 0.56 04/04/12 INTEREST INTEREST EARNED MARCH 2012
7100.1000
0.00 0.56 -1.43
1204 32293 4.97 05/02/12 INTEREST INTEREST EARNED APRIL 2012
7100.1000
0.00 4.97 -6.40
1205 32709 6.93 06/05/12 INTEREST INTEREST EARNED MAY 2012
7100.1000
0.00 6.93 -13.33
1206 33106 7.04 07/03/12 INTEREST INTEREST EARNED JUNE 2012
7100.1000
0.00 7.04 -20.37
1207 33554 5.80 08/06/12 INTEREST INTEREST EARNED JULY 2012
7100.1000
0.00 5.80 -26.17
1208 33969 4.04 09/04/12 INTEREST INTEREST EARNED AUGUST 2012
7100.1000
34004 4.04 09/06/12 INTEREST INTEREST EARNED AUGUST 2012
07 FUND
34114 4.04 09/14/12 REVERSE REVERSE TRX. 33969 - DUPLICATE ENTRY
4.04 8.08 -30.21
1209 34398 2.36 10/02/12 INTEREST INTEREST EARNED SEPTEMBER 2012
7100.1000
0.00 2.36 -32.57
4.04 36.61 -32.57
07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00
1201 31222 0.40 02/07/12 INTEREST INTEREST EARNED JAN. 2012
7105.1000
31223 7.80 02/07/12 INTEREST INTEREST EARNED JAN. 2012
7109.2000
31270 0.05 02/09/12 INTEREST INTEREST EARNED JAN.2012
7105.1500

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
0.00 8.25 -8.25
1202 31656 0.30 03/14/12 INTEREST INTEREST EARNED FEB. 2012
7105.1000
31657 7.30 03/14/12 INTEREST INTEREST EARNED FEB. 2012
7109.2000
0.00 7.60 -15.85
1203 31931 0.15 04/04/12 INTEREST INTEREST EARNED MARCH 2012
7105.1000
31932 9.54 04/04/12 INTEREST INTEREST EARNED MARCH 2012
7109.2000
0.00 9.69 -25.54
1204 32294 0.14 05/02/12 INTEREST INTEREST EARNED APRIL 2012
7105.1000
32295 9.52 05/02/12 INTEREST INTEREST EARNED APRIL 2012
7109.2000
0.00 9.66 -35.20
1205 32710 0.14 06/05/12 INTEREST INTEREST EARNED MAY 2012
7105.1000
32711 9.55 06/05/12 INTEREST INTEREST EARNED MAY 2012
7109.2000
0.00 9.69 -44.89
1206 33107 0.15 07/03/12 INTEREST INTEREST EARNED JUNE 2012
7105.1000
33108 9.52 07/03/12 INTEREST INTEREST EARNED JUNE 2012
7109.2000
0.00 9.67 -54.56
1207 33555 0.14 08/06/12 INTEREST INTEREST EARNED JULY 2012
7105.1000
33556 6.34 08/06/12 INTEREST INTEREST EARNED JULY 2012
7109.2000
0.00 6.48 -61.04
1208 33970 0.15 09/04/12 INTEREST INTEREST EARNED AUGUST 2012
7105.1000
34005 2.76 09/06/12 INTEREST INTEREST EARNED AUGUST 2012
07 FUND - CONTRUCTION ACCTS.
34115 0.15 09/14/12 REVERSE REVERSE TRX.33970 DUPLICATE ENTRY
0.15 2.91 -63.80
1209 34399 0.14 10/02/12 INTEREST INTEREST EARNED SEPTEMBER 2012
7105.1000
34400 3.08 10/02/12 INTEREST INTEREST EARNED SEPTEMBER 2012
7109.2000

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
0.00 3.22 -67.02
0.15 67.17 -67.02
07364-1110 R.C.TAPPING FEES 0.00
1205 RE 32596 2,000.00 05/25/12 32596 1 TAP IN FEE FOR 1636 MANLEY RD
0.00 2,000.00 -2,000.00
1206 32779 2,000.00 06/11/12 32779 1 TAP IN FEE FOR 913 SORRELL HIL
R.C.TAPPING FEES
0.00 2,000.00 -4,000.00
0.00 4,000.00 -4,000.00
07364-1130 CONNECTION FEES - SEWER 0.00
1202 CR 31243 423.00 02/08/12 197 6576 1 JACOBS, ROBERT & CHERYL
31437 423.00 02/27/12 2103 6575 1 STOFFLET, MICHAEL
JE 31244 141.12 02/08/12 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
31438 141.12 02/27/12 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
282.24 846.00 -563.76
1203 CR 31489 423.00 03/01/12 730 6574 1 GEORGE SMITH & CHRISTINA CONLE
JE 31490 141.12 03/01/12 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
141.12 423.00 -845.64
423.36 1,269.00 -845.64
07380-1000 MISCELLANEOUS REVENUE 0.00
1202 31244 141.12 02/08/12 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
31438 141.12 02/27/12 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 282.24 -282.24
1203 31490 141.12 03/01/12 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 141.12 -423.36
0.00 423.36 -423.36
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1202 31428 15,000.00 02/24/12 XFER XFER FROM 5100.1000 TO
7100.1000
0.00 15,000.00 -15,000.00
1203 31612 15,700.00 03/13/12 XFER XFER FROM 5100.1000 TO
7100.1000 TO COVER MA EXP.
0.00 15,700.00 -30,700.00

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
0.00 30,700.00 -30,700.00
07392-0900 TRANSFER FROM SEWER CAP RESERVE 0.00
1204 32045 100,000.00 04/12/12 XFER XFER $ FROM SEWER CAP.RESERVE
TO MUN.AUTHORITY GEN.ACCT.
0.00 100,000.00 -100,000.00
1206 32839 100,000.00 06/15/12 XFER XFER FUNDS TO MA FROM SEWER
CAPITAL RES. 5/14/12
0.00 100,000.00 -200,000.00
1207 33176 100,000.00 07/11/12 XFER XFER $ FROM SEWER CAPITAL
RESERVE TO MA OPERATING
0.00 100,000.00 -300,000.00
1208 33682 100,000.00 08/14/12 XFER XFER $ TO MA FROM SEWER CAP.
RESERVE
0.00 100,000.00 -400,000.00
0.00 400,000.00 -400,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1203 CD 31601 8,391.94 03/13/12 2085 425 EAST GOSHEN TOWNSHIP
1ST QTR.2012 MUNICIPAL AUTHORITY
EXPENSES
8,391.94 0.00 8,391.94
1206 32849 8,391.94 06/15/12 2094 425 EAST GOSHEN TOWNSHIP
2ND QTR 2012 MUNICIPAL AUTHORITY
EXPENSES
8,391.94 0.00 16,783.88
1209 34047 8,391.94 09/10/12 2135 425 EAST GOSHEN TOWNSHIP
3RD QTR.2012 MUNICIPAL AUTHORITY
EXPENSES
8,391.94 0.00 25,175.82
25,175.82 0.00 25,175.82
07424-3000 MISCELLANEOUS EXPENSE 0.00
1201 30772 950.00 01/06/12 2081 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2012 ACTIVE MEMBERSHIP DUES
950.00 0.00 950.00
950.00 0.00 950.00

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 5
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1207 33171 7,900.00 07/11/12 2103 808 MAILLIE FALCONIERO & CO.
EXAMINATION OF FINANCIAL STATEME
DECEMBER 31, 2011
7,900.00 0.00 7,900.00
7,900.00 0.00 7,900.00
07424-3130 ENGINEERING SERVICES 0.00
1202 31393 220.00 02/22/12 2084 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/15/12 2011 ANNUAL SE
220.00 0.00 220.00
1203 31608 1,182.50 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 2011 ANN
SERVICES
1,182.50 0.00 1,402.50
1204 32043 4,971.75 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 2012 GEN.S
4,971.75 0.00 6,374.25
1205 32450 14,501.00 05/15/12 2090 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 4/15/12 2011 CHAP.9
14,501.00 0.00 20,875.25
1206 32809 289.75 06/14/12 2092 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/13/12 GENERAL SE
289.75 0.00 21,165.00
1207 33171 1,142.00 07/11/12 2104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/12 -GENERAL SE
1,142.00 0.00 22,307.00
1208 33676 670.50 08/14/12 2131 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 7/15/12 -2012 GENE
SERVICES
670.50 0.00 22,977.50
1209 34048 448.50 09/11/12 2136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 8/12/12 -2011 CHAP
448.50 0.00 23,426.00
23,426.00 0.00 23,426.00
07424-3140 LEGAL SERVICES 0.00
1202 31393 1,825.68 02/22/12 2083 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 12/12/11 - GEN.AUTH.

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 6
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1,825.68 0.00 1,825.68
1204 32043 1,083.00 04/12/12 2087 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 2/7-2/29/12 GEN.AU
1,083.00 0.00 2,908.68
1205 32450 703.00 05/15/12 2089 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 3/12-3/21/12 GEN.AUT
703.00 0.00 3,611.68
1207 33171 684.00 07/11/12 2102 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 5/14/12 - GENERAL AU
684.00 0.00 4,295.68
1208 33676 475.00 08/14/12 2130 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 7/9/12 - GEN.AUTHORI
475.00 0.00 4,770.68
4,770.68 0.00 4,770.68
07424-7453 R.C. CAP EXPANSION - ELECTRICAL 0.00
1206 32809 1,228.08 06/14/12 2091 2696 CLINGER CORP., WM. H.
REPAIR TANK MIXER CONTROL CIRCUI
FAULT
1,228.08 0.00 1,228.08
1,228.08 0.00 1,228.08
07424-7475 LOCHWOOD ABANDONMENT ENGINEER 0.00
1202 31393 2,600.00 02/22/12 2082 2911 EARTHCORE SERVICES LLC
MOBILIZATION, ATV RIG, AUGER PRO
LOCKWOOD ENGINEERING
4,315.00 02/22/12 2084 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/15/12 LCSTP FINAL D
*** 6,915.00 0.00 ***
6,915.00 0.00 6,915.00
1203 31608 7,440.50 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 LCSTP FI
DESIGN
7,440.50 0.00 14,355.50
1204 32043 1,366.00 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 LOCHWOOD
1,366.00 0.00 15,721.50
1205 32450 4,124.25 05/15/12 2090 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/15/12 LCSTP

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 7
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
4,124.25 0.00 19,845.75
1206 32809 7,527.25 06/14/12 2092 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/31/12 TO
ACCOMADATE INCREASE IN FLOW TO P
7,527.25 0.00 27,373.00
1207 33171 7,009.25 07/11/12 2104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/12 - LOCHWOOD
CHASE PHASE S
7,009.25 0.00 34,382.25
1208 33676 3,725.25 08/14/12 2131 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 7/15/12 -LOCHWOOD
CONSTRUCTION PHASE S
3,725.25 0.00 38,107.50
1209 34048 3,985.80 09/11/12 2136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 8/12/12 - HERSH.MI
PUMP STATION MUFFIN MONSTER
3,985.80 0.00 42,093.30
42,093.30 0.00 42,093.30
07424-7476 LOCHWOOD ABANDONMENT CONSTRUCTION 0.00
1206 32809 105,473.97 06/14/12 2093 2947 SJM CONSTRUCTION CO. INC.
APPLICATION 1 OF CONTRACT
105,473.97 0.00 105,473.97
1207 33171 3,826.04 07/11/12 2101 425 EAST GOSHEN TOWNSHIP
REIMBURSE GEN.FUND RE: LOCHWOOD
PLANT CLOSING - LABOR COSTS AS O
6/30/12
42,086.94 07/11/12 2105 2947 SJM CONSTRUCTION CO. INC.
APPLICATION #2 - LOCHWOOD CONTRA
*** 45,912.98 0.00 ***
33173 3,954.36 07/11/12 2106 425 EAST GOSHEN TOWNSHIP
REIMBURSE GEN.FUND RE: LOCHWOOD
PLANT CLOSING - REGULAR TIME LAB
33327 15,120.00 07/23/12 2113 800 MACANGA INC.
HAUL FILL OUT OF WESTTOWN WAY 18
TONS
33415 432.00 07/27/12 2116 489 FISHER & SON COMPANY INC
6 BAGS COMMERCIAL SEED MIX
123.00 07/27/12 2117 61396 HAULER, JACK L.
REIMBURSE -1/2 DOG FENCE REPAIR
*** 555.00 0.00 ***
JE 33635 3,826.04 08/13/12 RECLASS RECLASS CK.#'S 2101 & 2106 TO
LOCHWOOD ELIMINATION PHASE 2

East Goshen Township General Ledger

Report Date 10/03/12 | GL Transaction Details | PAGE 8

MGRP18 run by BRIAN 1 : 18 PM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07424-74761207JE336353,954.3608/13/12RECLASSRECLASS CK.#'S 2101 & 2106 TO LOCHWOOD ELIMINATION PHASE 2
***0.007,780.40***
65,542.347,780.40163,235.91
1209CD3404813,632.5709/11/1221372947SJM CONSTRUCTION CO. INC. APPLICATION #3 - LOCHWOOD CHASE
34234413.0009/24/1221391876RANSOME RENTAL COMPANY LP EQUIP.RENTAL 9/5-9/7/12 STANDARD TRACK
14,045.570.00177,281.48
185,061.887,780.40177,281.48
07424-74770.00LOCHWOOD ELIMINATION PHASE 2
120633040352.6806/29/122095765LENNI ELECTRIC CORPORATION SET UP TEMPORARY PUMP - LOCHWOOD
450.0006/29/1220962342POWERPRO EQUIPMENT 50 HYDRATED WHITE - LOCHWOOD PLA CLOSURE
4,780.0006/29/122097550XYLEM DEWATERING SOLUTIONS INC.(GODWIN) GODWIN SUBMERSIBLE PUMP & CONTRO PANEL, HEAVY DUTY LAYFLAT HOSE
***5,582.680.00***
5,582.680.005,582.68
12073312842.5007/05/1221001065PETTY CASH TOLLS - TO AND FROM GODWIN PUMPS LOCHWOOD ELIMINATION
33209123.8707/13/1221072936A ANCHOR TOILETS PORTABLE PORTABLE TOILET RENTAL 6/25-7/24
4,640.8507/13/122108827MARTIN LIMESTONE INC. 95.91 TONS MAG LIMESTONE
390.0007/13/1221092342POWERPRO EQUIPMENT 20 2200 M 95 DUST MA, 40 HYDRATE WHITE LI
1,265.0007/13/1221101876RANSOME RENTAL COMPANY LP RENTAL - STANDARD TRACK - 6/20/1 6/25/12
1,574.6107/13/1221111161REILLY & SONS INC 259.4 GALLONS DIESEL - LOCHWOOD
256.8007/13/122112550XYLEM DEWATERING SOLUTIONS INC.(GODWIN) MALE AND FEMALE ADAPTORS, FEMALE CAM & GROOVE & MALE ADAPTOR
***8,251.130.00***
333273,638.0007/23/1221141876RANSOME RENTAL COMPANY LP ARTICULATED TRUCK RENTAL 6/26-6/
5,941.4507/23/122115550XYLEM DEWATERING SOLUTIONS INC.(GODWIN) 3" X 50' HEAVY DUTY LAYFLAT HOSE
***9,579.450.00***

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 9
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-7477 1207 CD 33415 174.82 07/27/12 2118 638 HOME DEPOT CREDIT SERVICES
TARP & SIGNS - LOCHWOOD
1,985.24 07/27/12 2119 827 MARTIN LIMESTONE INC.
72.56 TONS MAG LIMESTONE BULK
423.00 07/27/12 2120 1087 PIPE XPRESS INC.
12X20 PE DBL WALL PIPE
18,797.00 07/27/12 2121 1876 RANSOME RENTAL COMPANY LP
D5 STANDARD TRUCK RENTAL 6/25/12
7/23/12
*** 21,380.06 0.00 ***
JE 33635 3,826.04 08/13/12 RECLASS RECLASS CK.#'S 2101 & 2106 TO
LOCHWOOD ELIMINATION PHASE 2
3,954.36 08/13/12 RECLASS RECLASS CK.#'S 2101 & 2106 TO
LOCHWOOD ELIMINATION PHASE 2
*** 7,780.40 0.00 ***
47,033.54 0.00 52,616.22
1208 CD 33513 384.00 08/03/12 2122 489 FISHER & SON COMPANY INC
8 BAGS BUILDERS MIX/THROW & GROW
GRASS SEED
661.50 08/03/12 2123 1849 HICKS BROTHERS LLC
147 SMALL BALES OF STRAW
271.15 08/03/12 2124 739 KNOX EQUIPMENT COMPANY
TOWABLE STRAW MULCHER RENT 7/23/
3,378.00 08/03/12 2125 1876 RANSOME RENTAL COMPANY LP
STANDARD TRACK RENTAL 7/2-7/30/1
1,368.05 08/03/12 2126 1161 REILLY & SONS INC
186.8 GALLONS DIESEL
*** 6,062.70 0.00 ***
33667 675.00 08/14/12 2127 827 MARTIN LIMESTONE INC.
48.18 TONS AASHTO #1
33676 43,397.75 08/14/12 2129 425 EAST GOSHEN TOWNSHIP
REIMBURSE GEN.FUND RE: LOCHWOOD
PLANT CLOSING - LABOR COSTS AS O
8/12/12
33827 381.82 08/22/12 2132 598 HANSON AGGREGATES PENNSYLVANIA LLC
34.87 TONS STONE
123.50 08/22/12 2133 765 LENNI ELECTRIC CORPORATION
DISCONNECT FRO STATION SHUTDOWN
*** 505.32 0.00 ***
33946 1,148.00 08/31/12 2134 1876 RANSOME RENTAL COMPANY LP
BULL DOZER RENTAL 7/18-7/30/12
51,788.77 0.00 104,404.99
1209 34095 100.00 09/13/12 2138 739 KNOX EQUIPMENT COMPANY
STRAW MULCHER RENTAL 9/6/12
100.00 0.00 104,504.99
104,504.99 0.00 104,504.99

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 10
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07425-1000 MARYDELL PUMP STATION - ENGINEER 0.00
1203 31608 810.00 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 MARYDELL
810.00 0.00 810.00
1204 32043 1,422.00 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 MARYDELL P
1,422.00 0.00 2,232.00
1206 32809 320.50 06/14/12 2092 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/13/12 MARYDELL
320.50 0.00 2,552.50
1207 33171 707.25 07/11/12 2104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/12 - MARYDELL
707.25 0.00 3,259.75
1208 33667 1,100.00 08/14/12 2128 1248 SHAINLINE EXCAVATING INC
HYDRO EXCAVATOR RENTAL 7/18/12
33676 2,976.25 08/14/12 2131 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 7/15/12 - MARYDELL
4,076.25 0.00 7,336.00
1209 34048 6,890.75 09/11/12 2136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 8/12/12 - MARYDELL
6,890.75 0.00 14,226.75
14,226.75 0.00 14,226.75
07426-1000 HERSHEY MILL STATION - ENGINEER 0.00
1203 31608 2,336.75 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 HERSHEY
2,336.75 0.00 2,336.75
1205 32450 2,917.50 05/15/12 2090 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 4/15/12 HERSHEY MIL
2,917.50 0.00 5,254.25
1206 32809 498.50 06/14/12 2092 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/13/12 HERSHEY MI
33047 250.00 06/29/12 2099 263 CHESTER COUNTY CONSERVATION DISTRICT
PERMIT FEE HM PS PROJECT
748.50 0.00 6,002.75
1207 33171 4,112.75 07/11/12 2104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/12 - HERSHEY M
4,112.75 0.00 10,115.50
1208 33676 2,924.25 08/14/12 2131 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 7/15/12 - H.MILL

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 11
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
2,924.25 0.00 13,039.75
13,039.75 0.00 13,039.75
07427-1000 RESERVE PUMP STATION - ENGINEER 0.00
1203 31608 605.00 03/13/12 2086 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/11/12 RESERVE
605.00 0.00 605.00
1204 32043 472.50 04/12/12 2088 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 3/18/12 RESERVE PU
472.50 0.00 1,077.50
1205 32450 2,917.50 05/15/12 2090 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 4/15/12 RESERVE PS
2,917.50 0.00 3,995.00
1206 33047 250.00 06/29/12 2098 263 CHESTER COUNTY CONSERVATION DISTRICT
PERMIT FEE RESERVE PS PROJECT
250.00 0.00 4,245.00
1207 33171 1,062.50 07/11/12 2104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/12 - RESERVE P
STATION
1,062.50 0.00 5,307.50
1208 33676 2,924.25 08/14/12 2131 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 7/15/12 - RESERVE
2,924.25 0.00 8,231.75
1209 34048 358.25 09/11/12 2136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 8/12/12 - HERS.MIL
RESERVE PUMP PS
358.25 0.00 8,590.00
8,590.00 0.00 8,590.00
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
358.25 09/11/12 2136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 8/12/12 - HERS.MIL
RESERVE PUMP PS
358.25 0.00 358.25
358.25 0.00 358.25
Beg Bal 0.00 431,753.05 444,276.54 -12,523.49

East Goshen Township General Ledger
Report Date 10/03/12 GL Transaction Details PAGE 12
MGRP18 run by BRIAN 1 : 18 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description

SOCTOBER 2012
EAST GOSHEN MUNICIPAL AUTHORITY GOALS

ON-GOING

  1. Submit an article for each newsletter. a. Need by 2/8/12 - Kevin - Completed b. Need by 5/2/12 –Jack - Completed c. Need by 8/1/12 – Dana - Completed d. Need by 11/7/12 e. February 2013
  2. Attend West Goshen Meetings quarterly – more often if needed. a. 1 st Quarter (March) – Jack - Completed b. 2 nd Quarter (June) – Joe – Not completed c. 3 rd Quarter (September) – Dana Completed- Went to August Mtg d. 4 th Quarter (December) - Kevin
  3. Respond to capacity requests in 45 days or less. Goshen Meadows
  4. Implement I & I Plan
  5. Conduct a sewer facilities tour after RCSTP construction is complete – Have tour in October (need to select a date) October 20

PROJECTS

  1. Lockwood a. Bid – Bid awarded 2/20 – Contract executed 3/12 b. Pipe Installation - Notice to proceed issued 3/20, Pipe work completed. Restoration work in progress. Pipe Project Closed out 9/5/12
  2. Abandon Plant – Treatment pond filled in. Currently pumping down the and filling in the storage lagoon. Still need to finish filling in ponds and remove structure.
  3. Marydell Pump Station a. Design/Permit – In Progress Submitted HOP to Penn DOT. HOP Received. All permits received. Waiting on easement from shopping center b. Bid c. Pipe Installation d. Abandon Pump Station
  4. Hershey Mill Pump Station a. Design/Permit – In Progress GP5 and CCCD approval letter issued. Working on easements b. Bid c. Pipe Installation
  5. Reserve Pump Station - In Progress a. Design/Permit working on easements b. Bid c. Pipe Installation d. Abandon Pump Station

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2012\100812.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

October 5, 2012

To: Muncipal Authority

From: Mark Miller

Re: Replace Electrical Disconnects

On Monday October 1, 2012, Scott Towler called to report that the disconnect on pump two was inoperative. I called Lenni Electric to make repairs, when they opened the disconnect they found it was full of water. We opened the other two and found the same problem. The corrosion is so bad that the disconnects and hardware will have to be replaced. We also opened the wiring on the backside and found the same problem. We opened the other disconnects at the plant to see if any other ones were holding water; they were all dry.

I have attached a copy of the quote from Lenni Electric to replace the disconnects. The attached pictures show the corrosion and the water in the boxes. I put purple dye in one box to show the water.

Photograph showing water dripping from electrical disconnect box #2 labeled 480 VOLTS.

Shows water from disconnect # 2

480 VOLTS

1

Photograph showing the interior wiring and standing water inside electrical disconnect box #2.

Disconnect # 2

2

[Photograph: Close-up of corroded electrical disconnect switch mechanism and wiring.]

HEAVY DUTY
PLACE

Close up of the Corrosion

3

Photograph showing the interior of electrical disconnect box #3 with purple dye in standing water at the bottom.

LINE | L1 | L2 | L3 | GENERAL ELECTRIC | HEAVY DUTY | ARC SHIELD MUST BE IN PLACE

ENCLOSED SWITCH | 17 | 250Vdc

Purple Die Shows the water in # 3 Disconnect.

4

LENNI ELECTRIC CORPORATION

Oct 04 2012

East Goshen Township
1580 Paoli Pike
West Chester, PA. 19380

Attn: Mr. Mark Miller

Re: Ridley Creek WWTP
Replacement of Water Damaged Equipment

We offer a price of $6,668.09 for the following at the above referenced location.

  • LS – Remove and dispose of existing rack, trough and safety switches
  • 1 – Reconstruct rack using stainless steel strut ,supports and hardware
  • 1 - 6"X6"X48" 4X Stainless steel trough
  • 3 – Sq. D 600V 60A 3 pole safety switches
  • 6 – 1" pvc coated hubs
  • 3 – 1" X 4" pvc coated nipples
  • LS – Remove corrosion from conductors and re terminate
Electrician – 16 hrs. @ $69.00$1,104.00
Materials$4,838.34
15%$ 725.75
$6,668.09

Note : Approx. 4 hr bypass pumping will be needed.

If you have any questions, please contact me directly.

Sincerely,

LENNI ELECTRIC CORPORATION

James C. Hallman
C & I Division

1020 ANDREW DRIVE WEST CHESTER, PA 19380 • 610-436-9922 • FAX 610-436-9926
AN EQUAL OPPORTUNITY EMPLOYER M/F/V

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

October 5, 2012

To: Municipal Authority

From: Mark Miller

Re: September 2012 Monthly Report

Meters: Have been read on a daily basis. The meter for Westtown Way has been replaced, the Reservoir Road meter is back in service.

Pumping Stations: Were visited on a routine basis, no problems to report.

C.C. Collection: We replaced several sewer caps during the month . No problems to report.

R.C. Collection: No problems to report.

R.C. Plant: Routine maintenance was performed during the month. The final paving was completed two weeks ago. See memo with regards to wet well Disconects

Lockwood Plant: We are still waiting on PECO to turn off power and remove the transformers.

Alarms: We responded to 10 alarms during the month ranging from generators running to a high level alarm; all alarms were cleared and all stations put back in service.

PA One Calls: We received 109 PA One calls for the month of August.

EGMA 1200

Pennoni

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager

FROM: Daniel Barbato, P.E.
Authority Engineer

DATE: October 4, 2012

SUBJECT: Engineer’s Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • We will continue to assist with operations support and plant troubleshooting, and review operator reports as we receive them.

LCSTP Elimination

  • No further activity. The project has been completed, and our understanding is that final payment was made.

Hershey’s Mill PS Diversion and Reserve PS Elimination

  • DEP issued the GP-5 “General Permit for Utility Line Stream Crossing” for the Hershey Mill PS Diversion on August 31, 2012.
  • DEP has reviewed the GP-5 “General Permit for Utility Line Stream Crossing” permit applications for the Reserve PS Diversion and has verbally informed us that the permit is application is acceptable subject to a bog turtle screening by the Army Corps of Engineers (ACOE). We submitted a bog turtle screening request to the ACOE on October 3, 2012. They informed us they will attempt to provide a bog turtle habitat determination within 30 days. If there is no habitat, then DEP can issue the GP-5 permit. If there is habitat, we will have to coordinate impact mitigation strategies with Fish and Wildlife Service.
  • The Chester County Conservation District (CCCD) issued Erosion and Sediment Pollution Control Plan adequacy letters for the Hershey Mill PS and Reserve PS projects on September 4 and September 11 respectively.
  • We revised the four (4) sanitary sewer easement legal descriptions and exhibits for the diversion projects – one (1) for the Hershey’s Mill PS and three (3) for the Reserve PS –

Page 1 of 2
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-10-04.docx

EGMA 1200

to include construction limits. The revised documents were forwarded to the Township and Authority Solicitor.

  • We expect to submit the Reserve Closure Plan and Hershey Mill PS Water Quality Management Permit Amendment to DEP by October 9, 2012.
  • We also prepared draft bidding documents for each project. The projects will be bid separately, so separate bidding documents have been prepared. The Hershey Mill PS bidding documents and bid plans will be forwarded to the Township for review by the end of October. The Reserve PS bidding document and bid plans will be forwarded to the Township for review following once the bog turtle impacts are resolved.

Marydell PS Elimination

  • DEP has verbally informed us that the Pump Station Closure Plan has been approved and that a formal approval letter should be issued by October 5, 2012.
  • We prepared an easement legal description and exhibit for the shopping center. Once the easement is obtained, all third party approvals and permits will be in place, and the project can be put out to bid.
  • We are finalizing the bidding document and bid plans. We anticipate forwarding the documents to the Township by October 15 for review, with the intent of having the documents completed and ready for the Authority to provide direction to advertise at their November 12 meeting.

Hershey’s Mill Muffin Monster

  • DEP issued an approval letter for the Muffin Monster installation on September 11, 2012. No other third-party approvals are required for this project.
  • We have obtained a formal price quotation from the Muffin Monster supplier, which we have forwarded to the Township for approval. The quotation includes materials and start-up. Construction will be performed by Public Works.

Semi-Annual Sewer System (formerly “CO&A”) Status Report

  • We analyzed portable and permanent meter data from January-August 2012 and met with Mr. Smith and Mr. Miller to discuss our findings and recommendations for I/I investigations and future metering. We prepared the semi-annual sewer system status report and submitted it to the Township. This is the first internal-only report since the semi-annual CO&A submissions to DEP are no longer required.

Page 2 of 2
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-10-04.docx

Big Fish
Environmental Services Inc.

Monthly Operations Report: September 2012

Treatment Process Operation

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of August. SBR No. 2 remains out of service with a proximately a mixture of 1 foot of sludge and rainwater within the tank. Transfer of the contents of SBR 2 is planned during October.

During August, there was a total six (6) exceedances of the final effluent discharge limitations for outfalls 001 and 002. Outfall 001 experienced three (3) exceedances. The total phosphorus month average was reported as 1.57 mg/L as compared to the discharge limitation of 0.5 mg/L. The total suspended solids monthly average and weekly maximum were reported as 26 mg/L and 42 mg/L, respectively. Outfall 002, Applebrook, experienced the same three (3) exceedances.

Total phosphorus removal improved, however, the monthly concentration remains above the permitted monthly average. Daily sample collection and analysis for total phosphorus of the SBR effluent and final effluent discharged was implemented to monitor phosphorus removal. During September, this monitoring was expanded to include the influent, sludge hold tank decant and centrate.

Total suspended solids (TSS) exceedances are the result of elevated dosage rates of aluminum sulfate solution passing through the disc filters as a fine solid not visible to the eye. The final effluent was observed to contain no visible solids, however, there was a slight opaque appearance (cloudiness). Samples analyzed on site for TSS produced a residue with a white color on the filter paper. Non detect values for CBOD5, ammonia as nitrogen and fecal coliform support the assertion that the residue observed on the filter paper was largely inert solids rather than biomass solids

The process adjustments indicate the final effluent total phosphorus concentration is trending downward towards the discharge limitation concentration. Daily total phosphorus monitoring of the final effluent and post EQ (SBR effluent) will continue to monitor improvement towards achieving consistent total phosphorus concentrations compliant with the discharge limitation. Figure 1 illustrates the final effluent and Post EQ total phosphorus concentrations for August and September.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 5

Big Fish
Environmental Services Inc.

[Line graph: Final Effluent and Post EQ Total Phosphorus, mg/L from 8/7/2012 to 9/30/2012 showing Post EQ Total Phosphorus, Final Effluent Total Phosphorus, SBR Design Total Phosphorus, and Permit Limit.]

Figure 1

Additional details regarding total phosphorus removal are provided in an updated phosphorus removal update memo revised on October 4, 2012.

During September, the Neptune aluminium sulfate pump failed. Replacement parts were ordered and repair of the pump is scheduled for October 5th.

Presented below is a summary of the flow data for August and September 2012:

Flow data:

Flow Meter Location August 2012 September 2012
Total Volume for Month, MGD Average Daily Flow, gpd Total Volume for Month, MGD Average Daily Flow, gpd
Influent Wastewater 10.558 340,586 10.903 363,586
Treated Effluent to Disc Filters 8.691 280.353 9.789 326,291
Final Effluent Discharge 4.067 131,194 5.109 170,300
Applebrook Golf Course 2.178 70,262 1.759 58,645

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 5

Big Fish
Environmental Services Inc.

Applebrook pump turned off on September 26, 2012

Chemical Usage:

Chemical September 2012
Daily Average Total Monthly
Soda Ash 155 lbs./day 4,650 pounds
Magnesium Hydroxide 10 gpd 300 gallons
Alum 47.0 gpd 1,409 gallons
Polymer (centrifuge) 4.5* 27 gallons

*Six (6) days of centrifuge operation

Solids Dewatering and Disposal: September 2012

During September, the centrifuge dewatering system was placed in service. Presented blow is a summary of the solids processing activity:

September Sludge Dewatering Summary
Gallons of sludge dewatered 178,512 gallons
Average Dewatered Total Solids, % 17.5
Wet Tons 20.19
Dry Tons 3.533
Number of dumpsters 2

Listed below is the sludge processing data for the month of August, which was not available at the time of the report preparation.

August Sludge Dewatering Summary
Gallons of sludge dewatered 248,000 gallons
Average Dewatered Total Solids, % 17.6
Wet Tons 29.96
Dry Tons 5.275
Number of dumpsters 3

During the month, sludge wasting and decanting of the sludge holding tanks was ongoing. A total volume of 197,225 gallons of supernatant was decanted form the sludge holding tanks. pH and alkalinity were monitored on average twice per week and total solids once per week.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 5

Big Fish
Environmental Services Inc.

Sludge holding tank No. 1 began the month as 0.66 % total solids and was removed from service on September 9th. Tank level at the beginning of the month was 4.40 ft and at the end of the month was 1.37 ft.

Sludge holding tank No. 2 began the month as 0.89% total solids and ended the month at 1.09% total solids. Tank level at the beginning of the month was 11.90 ft and at the end of the month was 12.07 ft.

Maintenance, Repairs and Warranty

Listed below are the remaining warranty issues for RCSTP and status:

1. Alfa Laval spare parts:

Warranty call during March. Alfa Laval technician used parts from the Township's spare parts inventory to replace the rear bearing, seals, etc.

Action Required: Worth and Company (Alfa Laval) are in the process of replacing the spare parts (updated 10/1/12).

2. Siemens MCC Analog Hour Meters

The analog hour meters for SBR 2 blower, SBR 3 motive pump (recent), and SBR 4 motive pump have failed.

Action Required: Worth and Company are scheduling the replacement of the defective hour meters (updated 10/1/2012).

3. Alfa Laval MCC Hour Meter

The analog hour meter for Alfa Laval centrifuge hour meter has failed.

Action Required: Worth and Company are scheduling the replacement of the defective hour meters (updated 10/1/2012).

4. Influent Composite Sampler Pump

The influent sampler pump failed. A warranty claim was filed with Hach Company during July. On Sept. 24, 2012, Hach confirmed that the sampler was purchased during August 2009 and has a one year warranty.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 5

Big Fish
Environmental Services Inc.

Action Required: Worth and Company are scheduling the replacement of the defective hour meters (updated 10/1/2012).

5. SBR Alum valves (new)

The alum valves, used to provide alum to the SBRs, remain open at all times. Using the Siemens control panel to program operation of the alum addition to the SBRs (phase and run time of pump), all alum valves open and remain open regardless of phase. The valves open and close in manual mode. There appears to be a programming issue. An email was sent to Siemens on September 22, 2012.

Action Required: Worth and Company is working with Gary Roberts from ICI (Siemens) to correct the problem.

6. SBR 4 Blower operation during Aeratd Fill (new)

SBR 4 blower was observed on 9/22/12 and 9/23/12 to not operated during the aerated fill phase. The blower was observed to begin operation during React Phase. This malfunction is the most likely contributing factor for the undesirable DO trend as well as contributes to excessive anoxic/anaerobic conditions and potential for undesirable filamentous growth (SVIs are increasing)

Action Required: Worth and Company is working with Gary Roberts from ICI (Siemens) to correct the problem

7. Floc tank Mixer Hour Meter on ACS Panel (new)

The floc tank mixer is operational; however, the hour meter reading on the ACS panel does not register hours.

Action Required: None. Issue has been resolved.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 5

3800-FM-WSFR0435 7/2009

pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTAL REPORT
DAILY EFFLUENT MONITORING

Facility Name: Ridley Creek Sewgae Treatment Plant
Municipality: East Goshen Municipal Authority
County: Chester
Month: 8 Year: 2012
Watershed: 3-G
Permit No.: PA0050504
Outfall: 002
Laboratories: ALS Environmental
Renewal application due 180 days prior to expiration.
This permit will expire on: February 28, 2017

Week Day Date Parameter Flow pH Dissolved Oxygen CBOD5 TSS Fecal Coliform NH3-N Total Phosphorus
Stage 1 1 1 1 1 1 1 1
Units MGD S.U. Q mg/L Q mg/L Q mg/L Q mg/L Q mg/L Q CFU/100 ml
1Sun7/29/120.07797.17.78
Mon7/30/120.07317.048.36
Tue7/31/120.07317.088.04
Wed8/1/120.07296.938.2
Thu8/2/120.07276.877.97<2.020.0<1.0<0.11.1
Fri8/3/120.07737.128.12
Sat8/4/120.05666.928.13
2Sun8/5/120.06526.927.91
Mon8/6/120.06836.938.31
Tue8/7/120.06597.157.06
Wed8/8/120.07317.088.0
Thu8/9/120.07146.957.92<2.042.0<1.0<0.12.3
Fri8/10/120.06187.17.92
Sat8/11/120.07337.138.19
3Sun8/12/120.07606.968.38
Mon8/13/120.08037.187.99
Tue8/14/120.06596.988.46
Wed8/15/120.07356.97.18
Thu8/16/120.07156.946.563.339.0<1.02.772.2
Fri8/17/120.06466.817.64
Sat8/18/120.06976.87.94
4Sun8/19/120.05427.488.57
Mon8/20/120.06838.118.59
Tue8/21/120.07048.128.56
Wed8/22/120.06918.118.16
Thu8/23/120.07347.278.512.211.0<1.00.11.3
Fri8/24/120.06447.228.22
Sat8/25/120.07957.458.87
5Sun8/26/120.07867.047.8
Mon8/27/120.07217.048.2
Tue8/28/120.07687.148.06
Wed8/29/120.08317.358.13
Thu8/30/120.06827.418.55<2.017.0<1.00.10.93
Fri8/31/120.06087.38.44
Sat9/1/120.08747.538.58
Statistics for DMR
Daily Minimum (Conc.):6.86.56<211<1<0.10.93
Daily Maximum (Conc.):8.128.873.342<12.772.3
Max Avg Weekly (Conc.):8.53.342<12.772.77
Avg Monthly (Conc.):8.08<226<1<22
Geometric Mean (Conc.):<0.63
Max Avg Weekly (Load):0.0752775250.60.4
Avg Monthly (Load):0.070284<115<0.40.12
Total Monthly (Load):2.17881<42476<18<12
Daily Minimum (Load):0.054206#REF!#REF!#REF!#REF!#REF!#REF!#REF!
Daily Maximum (Load):0.083076#REF!#REF!#REF!#REF!#REF!#REF!#REF!

I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).

Prepared By: Scott A. Towler
Title: Plant Operator
License No.: T0390
Date: 27-Sep-12

Big Fish
Environmental Services Inc.

September 27, 2012

Dave Wolfinger
Water Quality Specialist
Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401

Re: East Goshen Township Municipal Authority
NPDES Permit No. PA -August 2012 DMR

Dear Mr. Wolfinger:

The Ridley Creek sewage treatment plant sequencing batch reactor activated sludge process is currently utilizing three (3) of the four (4) SBR basins. RCSTP outfalls 001 and 002 experienced three (3) exceedances of effluent discharge limitations. Both outfalls exceeded the discharge limitation for the monthly average for total phosphorus. Additionally, both outfalls exceeded the monthly average and weekly maximum for total suspended solids.

Previously reported with the July DMR, measures to improve biological phosphorus removal are ongoing. We have implemented adjustments of the sequencing batch reactor (SBR) operational set points to support condition to promote biological phosphorus removal. In addition, adjustment and monitoring of aluminum sulfate solution dosage feed rates to assist in total phosphorus removal are ongoing.

The elevated total suspended solids (TSS) concentrations are a result of very fine floc particles passing through the disc filters through the outfall. Final effluent clarity was good with no visible solids, however, samples filtered on site revealed a fine white substance as opposed to darker solids representative of those in the mixed liquor suspended solids (MLSS). Although the effluent clarity was good, the effluent periodically exhibited a slight “cloudiness.” The cloudiness” varied with flow rates through the disc filters. The non-detect concentrations for BOD5, ammonia as nitrogen and fecal coliform concentrations support the belief that the TSS reported during August is characterized as an inert solid related to aluminum sulfate and colloidal solids.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 4

Big Fish
Environmental Services Inc.

Elevated total phosphorus concentrations during August are directly related to the elevated suspended solids concentrations.

Corrective measures include daily on site monitoring of final effluent flow equalization tank and final effluent grab samples for pH, total alkalinity and total phosphorus. Daily total phosphorus data is used to determine adjustments to the aluminum sulfate solution dosage rates. In addition, adjustments to the activated sludge process are ongoing.

The influent total phosphorus data from May through August indicates an upward trend on increasing concentrations. Grab samples collected during sludge thickening and dewatering operations indicate high concentrations of phosphorus returned to the influent wastewater. Table 1 provides a summary of the data collected during May through August 2012.

Table 1 – Total Phosphorus Concentration
Sample Date Influent Total Phosphorus, mg/L Final Effluent Phosphorus, Total, mg/L Final Effluent Total Suspended Solids
May 3, 20123.10.2312
May 10, 20122.20.128
May 17, 20128.40.876
May 24, 20123.70.16
May 31, 20124.30.11<5
June 7, 20124.40.2919
June 14, 20124.20.226
June 21, 20124.40.438
June 28, 201218.43.6<5
July 5, 20124,71.113
July 12, 20124.43.4<5
July 19, 201210.83.75
July 23, 20128.24.1<5
August 2, 201235.61.120
August 9, 20126.22.342
August 16, 201211.52.239
August 23, 20127.61.311
August 30, 20129.50.9317
September 6, 20129.20.726

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 4

Big Fish
Environmental Services Inc.

The data in Table 1 is represented graphically is the chart 1.

[Line graph: RCSTP Influent & Final Effluent Total Phosphorus : May through August 2012, showing Influent Total Phosphorus, mg/L and Final Effluent Total Phosphorus, mg/L from 21-Apr-12 to 28-Sep-12.]

Both Table 1 and Chart 1 indicate a downward trend of the final effluent total phosphorus concentration. The analytical report received for the September 6, 2012 indicates the trend is continuing to approach the discharge limitation of 0.5 mg/L.

During September, the pump that adds aluminum sulfate prior of the disc filters failed. Replacement parts arrived on September 27th. Repair of the pump is for September 28th. During the interim aluminum sulfate, solution has been added directly to the SBRs to assist in total phosphorus removal.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 4

Big Fish
Environmental Services Inc.

Should you have any questions, request additional information or clarification, please do not hesitate to contact me. You may contact me through email at scott_towler@comcast.net or by mobile phone at 484-401-4198.

Sincerely,

Scott A. Towler, P.E., SEO, LO
Big Fish Environmental services, Inc.

Cc: Rick Smith, East Goshen Township Manager
Mark Miller, East Goshen Township Director of Public Works
Daniel P. Barbato, P.E., Pennoni Associates, Inc.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 4

2008 FLOWMETERS

2012 SEPTEMBER 3RD QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip InchesDATEWESTTOWN WAY READINGWESTTOWN WAY GPDELLIS LANE READINGELLIS LANE GPDPAOLI PIKE READINGPAOLI PIKE GPDWILSON DRIVE READINGWILSON DRIVE GPDSUMMIT GPDNET FLOWSDATE
0.0009/01/1220,400009/01/12
3.2509/02/1220,400009/02/12
1.7509/03/1220,400009/03/12
0.0709/04/1220,400009/04/12
0.0509/05/1225,972,712154,06612,963,08566,09614,808,51384,14020,400611,09809/05/12
0.0009/06/1225,991,004182,92012,969,29062,05014,819,415109,02020,400561,41009/06/12
0.5209/07/1226,000,92199,17012,975,52562,35014,829,999105,84020,400648,04009/07/12
0.0009/08/1220,400009/08/12
0.0009/09/1220,400009/09/12
0.0009/10/1226,039,852129,77012,993,52760,00714,854,32781,09320,400644,53009/10/12
0.0009/11/1226,052,186123,34012,999,11455,87014,863,14288,15020,400648,04009/11/12
0.0009/12/1226,063,897117,11013,004,48953,75014,871,55084,08020,400660,46009/12/12
0.0009/13/1226,075,684117,87013,009,71152,22014,879,11775,67020,400669,64009/13/12
0.0009/14/1226,087,797121,13013,014,92452,13014,886,26071,43020,400670,71009/14/12
0.0009/15/1220,400009/15/12
0.0009/16/1220,400009/16/12
0.5009/17/1226,121,978113,93713,028,33044,68714,903,11256,17320,400700,60309/17/12
0.7509/18/1226,132,322103,44013,032,89245,62014,910,82677,14020,400689,20009/18/12
0.0009/19/1226,145,788134,66013,039,15162,59014,920,57997,53020,400620,62009/19/12
0.0009/20/1226,156,097103,09013,044,65155,00014,928,01574,36020,400682,95009/20/12
0.0009/21/1226,166,05799,60013,049,02243,71014,934,71466,99020,400705,10009/21/12
0.1509/22/1220,400009/22/12
0.0009/23/1220,400009/23/12
0.0009/24/1226,203,254123,99013,062,09443,57314,951,69356,59720,400691,24009/24/12
0.0009/25/1226,213,296100,42013,066,48043,86014,958,47667,83020,400703,29009/25/12
0.1009/26/1226,222,62293,26013,070,85343,73014,964,92364,47020,400713,94009/26/12
0.2109/27/1226,232,25096,28013,074,85940,06014,972,64077,17020,400701,89009/27/12
0.0009/28/1226,241,85796,07013,079,06242,03014,980,18975,49020,400701,81009/28/12
0.0009/29/1220,400009/29/12
0.0509/30/1220,400009/30/12
7.850117,22951,63078,510668,032

EG TWP | MONTH TO DATE: 7.85 | NORMAL MONTH TO DATE | YEAR TO DATE: 34.92 | NORMAL YEAR TO DATE

f:/data/users/joanna/ 2003 flowmeters | 10/3/201211:44 AM

2008 FLOWMETERS

2012 SEPTEMBER 3RD QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

HERSHEY'S MILL READINGHERSHEY'S MILL GPDASHBRIDGE READINGASHBRIDGE GPDHICKS METER READINGHICKS METER GPDRESERVOIR READINGRESERVOIR GPDSHERMAN READINGSHERMAN GPDBARKWAY READINGBARKWAY GPD
24,180,25268,9031,495,49771,745877,5826,8702,518,47610,344
24,231,33572,9761,499,71760,286882,8297,4962,525,3159,770
24,244,52743,9731,500,88138,800884,1384,3632,527,1916,253
24,291,20377,7931,505,09470,217888,7107,6202,534,21811,712
141,44346,965,891
217,982765,390
290,844728,620
24,337,85566,6461,509,25559,443368,972781,280893,5306,8862,541,1499,901
445,632766,600
66,05860,0980760,4736,6479,596

f:/data/users/joanna/ 2003 flowmeters | 10/3/201211:44 AM

2012 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY1,296,433152,58569,72969,44020,40073,08690,22567,846909,3226,92212,327
FEBRUARY1,172,663140,57961,07465,91120,40063,55573,939295,4661,019,6376,56111,350
MARCH1,157,405222,65761,10371,03920,40060,27670,943300,48406,7078,575
APRIL1,059,167186,20853,35357,57820,40058,98763,358285,508285,6136,40710,305
MAY1,144,546167,83063,64881,62220,40055,37860,690304,075652,0836,35410,862
JUNE1,125,246105,30362,21090,57020,40070,25961,5976,51710,177
JULY994,447122,35959,21281,06720,40063,42158,789005,3179,892
AUGUST835,17891,49651,64479,50620,40060,57558,5770909,1316,4509,654
SEPTEMBER0117,22951,63078,51020,40066,05860,0980760,4736,6479,596
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave976,121145,13859,28975,02720,40063,51166,468250,676756,0436,43110,304

To West Goshen: 696,666

2012 flowmeters -all-stations separate month worksheets;004.xlsSUMMARY

Flowmeters September 2012

Line chart.

September

Flow's: 800000, 700000, 600000, 500000, 400000, 300000, 200000, 100000, 0

Day of the Month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30

Monthly Totals 2012 Jan-Dec

Bar chart.

Flowmeters: 1400000, 1200000, 1000000, 800000, 600000, 400000, 200000, 0, -200000

Month: January, February, March, April, May, June, July, August, September, October, November, December

Sept. Precip. 7.85 - 2012

Bar chart.

September

precip.: 3.5, 3, 2.5, 2, 1.5, 1, 0.5, 0

snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33

2012 Monthly Precipitation

Bar chart.

Series1

8, 7, 6, 5, 4, 3, 2, 1, 0

January, February, March, April, May, June, July, August, September, October, November, December

Executive Summary

Total phosphorus removal by the Ridley Creek Sewage Treatment Plant (RCSTP) has been adversely impacted by ineffective biological removal, inadequate delivery of aluminum sulfate and sludge processing. Corrective actions include;

  • adjustments to improve biological phosphorus removal,
  • addition of aluminum sulfate to the SBRs,
  • repair of the pump (warranty) used to convey aluminum sulfate to the static mixer,
  • omit all sludge processing and decanting operations two days prior to sample events (Thursday),
  • continued daily monitoring of total phosphorus concentration of the post flow equalization basins and final effluent

Phosphorus removal improved during the month of August, however, the monthly average of 1.57 mg/L remains higher than the permitted discharge concentration of 0.5 mg/L. Weather and malfunctioning pumps during early September have adversely affected phosphorus removal. Continued adjustments to the activated sludge process and sequencing batch reactor (SBR) set points are frequently monitored to measure progress towards biological phosphorus removal. The time line to achieve consistent phosphorus removal that is compliant with the permitted discharge limitation is anticipated during October 2012, provided all mechanical equipment deficiencies are resolved during September.

Activated sludge process adjustments: biological removal

Three (3) of the four (4) SBR basins are on line. The target mixed liquor suspended solids (MLSS) concentration is the range of 2,900 to 3,300 mg/L. SBRs 1 and 3 have MLSS concentrations below the target. Heavy rainfall and flow rates during September 3rd and 4th resulted in solids loss during several filled settle and filled decant events. The average MLSS concentrations for the SBRs during September are; SBR 1 is 1,300 mg/L, SBR 3 is 1,606 and SBR 4 is 3,529 mg/L. Sludge wasting rates have been adjusted to increase the MLSS concentrations for SBRs 1 and 3. Additional process adjustments include:

Action Objective
Reduction of the minimum time of aeration from 230 minutes to 195 minutes per cycle (this is the sum of aerated fill and react phases). Increase the idle time to provide for a target range of 1 to 2 hours of anaerobic conditions.
Increase in the settle time from 60 minutes to 75 minutes. Increases settle time to provide for additional anoxic/anaerobic conditions.
Addition of aluminum sulfate to the SBRs 1 and 3 (SBR 4 alum feed remains out of service due to warranty) Addition of aluminum sulfate during mixed fill to coagulate available phosphorus released during anaerobic conditions.
Reduce the anoxic fill time from 44 minutes to 30 minutes. Assist to reduce the oxygen demand during aerated fill and react caused as a result of extended anoxic/anaerobic conditions
Monitor final effluent and post flow equalization grab samples for total phosphorus. Post flow equalization total phosphorus concentrations represent biological phosphorus removal and assist to determine the aluminum sulfate dosage rates.

Phosphorus Removal Update
Memo dated September 16, 2012
Page 1 of 3

Addition of aluminum sulfate to the SBRs

The Watson Marlow chemical feed pumps used to convey aluminum sulfate to the SBRs have been placed in service. These pumps have been temporarily in service to convey magnesium hydroxide solution to the SBRs to assist with maintaining adequate pH and alkalinity concentrations required for nitrification.

Aluminum sulfate solution can assist to improve settleability of the MLSS; however, it creates an alkalinity demand. Aluminum sulfate solution competes for alkalinity required for nitrification and contributes to lower pH values. Soda ash directly added to the SBR basins during fill or react phases assist to maintain adequate alkalinity concentrations required for nitrification. Magnesium hydroxide solution is also added to the influent wet well to assist in maintaining alkalinity concentrations.

Repair of malfunctioning equipment

Addition of aluminum sulfate solution to assist in phosphorus removal has recently been hindered by mechanical deficiencies. Worth & Company has been notified of the malfunctioning equipment and arrived on site on Thursday, September 13th to evaluate the equipment. The equipment is identified as:

Equipment Deficiency Impact
SBR 4 alum valve CV-34 Valve fails or open or close. Previously investigated by Worth & Company with no solution. Prevents the addition of aluminum sulfate solution to SBR 4 for phosphorus removal.
Neptune alum feed pump Pump was confirmed to have failed on September 11th. Suction and discharge lines were confirmed to be clear of any obstructions. Pump motor functions, however, no chemical is conveyed. Prevents the addition of aluminum sulfate solution to treated final effluent prior to the disc filters.

Solids processing

Grab samples of the sludge holding tank supernatant were measured to have total phosphorus concentrations ranging between 9 and 11 mg/L. The August influent phosphorus concentration monthly average was 8.7 mg/L (omitting the 35.6 mg/L value). This monthly average is higher than previous months as shown below:

  • March 2012 Monthly Average 5.2 mg/L
  • April 2012 Monthly Average 6.2 mg/L
  • June 2012 Monthly Average 8.3 mg/L
  • July 2012 Monthly Average 7.0 mg/L

Operation changes to omit any solids dewatering or decanting of the sludge holding tanks will be scheduled between Thursday evening and Monday evening. Weekly sample collection for DMR

Phosphorus Removal Update
Memo dated September 16, 2012
Page 2 of 3

reporting is scheduled for Thursdays. Schedule adjustments will be monitored for reduction of internal phosphorus loading.

Total Phosphorus Monitoring

During week days, daily monitoring of final effluent and post flow equalization effluent will be collected and analyzed for total phosphorus concentrations. In addition, grab samples of the sludge holding tank, centrifuge centrate and influent will be collected and analyzed during solids processing. Spilt sample analysis of samples sent to the contract laboratory will continue. In addition, Grab samples from the SBRs during react, settle and idle phases will be routinely analyzed for total phosphorus.

Phosphorus Removal Update
Memo dated September 16, 2012
Page 3 of 3

East Goshen Township Municipal Authority

Month of August 2012
DRAFT REPORT
Ridley Creek Sewage Treatment Plant Monthly Operations Report

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
MGD Average mg/L
335
lbs/day
2,098
mg/L
320
lbs/day
2,001
mg/L
32
lbs/day
200
mg/L
48
lbs/day
301
mg/L
9.1
lbs/day
57
Sample Date
August 2, 2012 0.2692 1180 2,649 710 1,594 43.2 97 115 258 35.6 80
August 9, 2012 0.2753 278 638 208 478 34.3 79 35.9 82 6.2 14
August 16, 2012 0.2297 747 1,431 305 584 56.9 109 11.5 22
August 23, 2012 0.3594 309 926 56 168
August 30, 2012 0.3075
Average 0.2882 629 1411 320 706 39 88 69 150 18 39
Minimum 0.2297 278 638 56 168 34 79 36 82 6 14
Maximum 0.3594 1180 2649 710 1594 43 97 115 258 36 80

Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average
0.75
Instantaneous Maximum
40
mg/L
20
lbs/month
125
mg/L
21
Instantaneous Maximum
42
lbs/month
131
mg/L
7
lbs/month
44
mg/L
0.5
lbs/month
3
Geo Mean
200
Geo Mean
1,000
Sample Date
August 2, 2012 0.100 2.0 1.7 20 17 0.10 0.08 1.10 0.92 1 0.0000
August 9, 2012 0.104 2.0 1.7 42 36 0.10 0.09 2.30 1.99 1 0.0000
August 16, 2012 0.123 3.3 3.4 39 40 2.20 2.26 1 0.0000
August 23, 2012 0.164 2.2 3.0 11 15 1 0.0000
August 30, 2012 0.1050
Average 0.1192 2.4 2 28 27 0.100 0.09 1.87 1.72 1 0.0000
Minimum 0.1000 2.0 2 11 15 0.100 0.08 1.10 0.92 1 0.0000
Maximum 0.1640 3.3 3 42 40 0.100 0.09 2.30 2.26 1 0.0000

Page 1 of 1

East Goshen Township Municipal Authority

Month of July 2012
FINAL REPORT
Ridley Creek Sewage Treatment Plant Monthly Operations Report

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
MGD Average mg/L
335
lbs/day
2,098
mg/L
320
lbs/day
2,001
mg/L
32
lbs/day
200
mg/L
48
lbs/day
301
mg/L
9.1
lbs/day
57
Sample date
July 5, 2012 0.3355 162 453 84 235 36.5 102 51.9 145 4.7 13
July 12, 2012 0.3159 237 624 328 864 28.4 75 35.6 94 4.7 12
July 19, 2012 0.3105 715 1,852 992 2,569 36 93 55.3 143 10.8 28
July 26, 2012 0.2926 587 1,432 542 1,323 3.92 10 62.9 153 8.2 20
Average 0.3136 425 1090 487 1248 26 70 51 134 7 18
Minimum 0.2926 162 453 84 235 4 10 36 94 5 12
Maximum 0.3355 715 1852 992 2569 37 102 63 153 11 28

Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average
0.75
Instantaneous Maximum
40
mg/L
20
lbs/month
125
mg/L
21
Instantaneous Maximum
42
lbs/month
131
mg/L
7
lbs/month
44
mg/L
0.5
lbs/month
3
Geo Mean
200
Geo Mean
1,000
Sample date
July 5, 2012 0.145 2.0 2.4 13 6 0.23 0.12 1.10 0.12 1 0.0000
July 12, 2012 0.108 2.0 1.8 5 5 0.10 0.09 3.40 0.09 1 0.0000
July 19, 2012 0.125 2.0 2.1 5 5 0.10 0.10 3.70 0.10 1 0.0000
July 26, 2012 0.128 2.0 2.1 5 5 0.10 0.11 4.10 0.11 1 0.0000
Average 0.1265 2.0 2 7 5 0.133 0.11 3.08 0.11 1 0.0000
Minimum 0.1080 2.0 2 5 5 0.100 0.09 1.10 0.09 1 0.0000
Maximum 0.1450 2.0 2 13 6 0.230 0.12 4.10 0.12 1 0.0000

Page 1 of 1

THE COUNTY OF CHESTER

COMMISSIONERS
Terence Farrell
Kathi Cozzone
Ryan A. Costello

Ronald T. Bailey, AICP
Executive Director

PLANNING COMMISSION
Government Services Center, Suite 270
601 Westtown Road
P.O. Box 2747
West Chester, PA 19380-0990
(610) 344-6285 Fax: (610) 344-6515

FYI

September 25, 2012

Dear Municipal Official;

I am pleased to provide you with 35 copies of an update to a brochure titled "Discover the future - creating a sustainable future for Chester County." The Chester County Planning Commission, in partnership with the United States Department of Energy, created the second of two brochures to supplement our sustainability website www.ChescoPAgreen.org and to spotlight County-wide examples of successful sustainable activities in the public and private sectors as well as in educational institutions.

This brochure includes a link to an interactive map that is available online at:
http://chescopagreen.org/resources/interactivemap.cfm

In addition to expressing Chester County's commitment to expanding economic, environmental and social values, our sustainability website represents an implementation tool for the County's long-range policy plan, Landscapes2.

We hope you enjoy Discover the future and we invite you to explore www.ChescoPAgreen.org. Please feel free to display these in your municipal building. We will be glad to provide you with additional copies of the brochure if you wish.

Sincerely,

Ronald T. Bailey, AICP
Executive Director

RTB/WB/kp
Enclosure

E-mail: ccplanning@chesco.org • www.landscapes2.org • Web site: www.chesco.org/planning