Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
February 20, 2012

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, February 20, 2012 at 7:00pm at the East Goshen Township building. Members in attendance were: Chairman Dana Pizarro, Joe McCawley, Jack Yahraes, Fran Beck, and Kevin Cummings. Also in attendance were: Carmen Battavio (Township Supervisor), Dan Barbato (Pennoni), Bob Adams, (Solicitor), Rick Smith (Township Manager), Mark Miller (Director of Public Works), Jesse Goldberg (Miller Environmental), Rick Harp (Miller Environmental), Scott Towler, and Walter Wujcik (Conservancy Board).

Call to Order & Pledge of Allegiance
Dana Pizarro called the meeting to order at 7:02pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Dana asked if anyone would be recording the meeting and there was no response.

Chairman’s Report/Other Members’ Reports
None

Approval of Minutes
The Chairman noted that the minutes of the January 9, 2012 meeting were approved as corrected.

Approval of Invoices
Jack moved to approve payment of the following invoices:
a. Pennoni #494474, $ 220.00
b. Pennoni #494475, $4,315.00
c. Pennoni #494477, $ 682.50
Joe seconded the motion. There was no public comment. The motion passed unanimously.

Jack moved to approve payment of the following invoice:
d. Earth Core #6229, $2,600.00
Fran seconded the motion. There was no public comment. The motion passed unanimously.

Jack moved to approve payment of the following invoices
e. Gawthrop Greenwood #95900, $ 476.68
e. Gawthrop Greenwood #96712, $1,349.00
Fran seconded the motion. There was no public comment. The motion passed unanimously.

Liaison Reports

Walter Wujcik reported that the Conservancy Board planned to plant additional material at the re-forestation area at Line Road and Paoli Pike. Jack noted that Keep East Goshen Beautiful Day would be held on April 14 and asked Walter not to select that date for their event.

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 02-20-12 final.doc
1

Financial Reports
Rick advised that they would be distributed next month.

Old Business
The Clinger invoice was discussed, and it was suggested that Rick write a letter advising Clinger that the Authority would consider a new invoice that depicted the hours and wages for the electrician only.

Goals

  1. Newsletter - Jack will prepare the article for May
  2. West Goshen - Jack will attend the March West Goshen meeting.
  3. RCSTP Tour – It will take place in September

New Business

a. Miller Environmental – Jesse Goldberg and Rick Harp were present to discuss some operational issues at the RCSTP. Jesse noted that they needed to run the centrifuge as much as possible to reduce the solids level at the plant. The solids in the digesters are at 2% and the centrifuge is designed to operate with 1-1.5% solids. He commented that the polymer was stale and the new polymer had been ordered. In addition while the centrifuge was designed to run at 20 to 90 gallons per minute they could only operate it a 40-45 gallons per minute. He noted that operating the centrifuge places an additional load on the plant. Finally he expressed the need to address the Norcardia issue in SBR 2.

Kevin and Joe both expressed a concern that the plant was not meeting permit. Rick Harp commented that SBR 3 and 4 where producing good quality effluent, the problem was the Norcardia in SBR 2. He said this was a result of the high organic loading to SBR 2. It was suggested that Miller obtain influent loading for each SBR.

In response to a question about the NOV Jesse said he would draft a response to DEP. The response would be sent to Bob Adams and Dan Barbato for review. Mark was asked to contact DEP and ask for an extra week to respond.

Executive Session
The Authority met in executive session from 8:15 to 8:50 to discuss a pending legal matter.

New Business (Continued)

b. Pennoni Proposal for Construction Services for the Lockwood Project. Fran moved to accept the proposal with the condition that the fee shall not exceed $16,000 without prior approval of the Authority. Jack seconded the motion. There was no public comment. The motion passed unanimously

c. Lockwood Bids – Dan reviewed the bid results (attached) with the Authority. Jack moved to accept the bid from SJM Construction Company, Inc in the amount of $178,179.20. Fran seconded the motion. There was no public comment. The motion passed unanimously

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 02-20-12 final.doc
2

Capacity Requests
None

Sewer Reports
a. Director of Public Works Report
b. Pennoni Report
c. Miller Environmental
d. Flow Report

Dana acknowledged receipt of the above reports.

Any Other Matter
None

Correspondence and Reports of Interest
None

Public Comment
None

Adjournment
There being no further business, Joe moved to adjourn the meeting. Jack seconded the motion. The motion passed unanimously. The meeting was adjourned at 9:20 pm.

Respectfully submitted,

Louis F. Smith, Jr.
Township Manager

F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 02-20-12 final.doc
3

eBid eXchange Export
Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSION No. SS-2012-1
Generated 2/15/2012 10:02 AM Eastern

Number Type Description Unit Of Measure Quantity SJM Construction Company, Inc. Anrich,Inc. Ron Smith Inc. B Excavating, Inc.
1 BASE Installation, Maintenance, and Removal o LS 1 $21,900.00 $10,000.00 $10,000.00 $17,758.85
2 BASE 8 Sanitary Sewer Main in Paved Areas. Pri LF 484 $34,364.00 $48,400.00 $34,523.72 $50,432.80
3 BASE 8 Sanitary Sewer Main in Non-Paved Area LF 814 $29,181.90 $61,050.00 $42,930.36 $37,362.60
4 BASE Manholes. Price complete, in place EA 8 $20,728.00 $19,200.00 $27,209.20 $21,560.00
5 BASE Drop Connection to Existing Manhole EXM LS 1 $5,448.00 $500.00 $3,815.70 $2,445.00
6 BASE 4 Laterals. Price complete, in place LF 99 $4,286.70 $3,465.00 $4,031.28 $13,634.28
7 BASE Cleanouts. Price complete, in place EA 6 $6,348.00 $1,500.00 $2,198.10 $2,040.00
8 BASE 8 Superpave 25 mm Base Course Paving. SY 240 $15,120.00 $13,200.00 $27,220.80 $12,972.00
9 BASE In-Kind Concrete Curb Replacement. Price LF 140 $4,900.00 $4,900.00 $5,397.00 $3,990.00
10 BASE Abandon Existing 8 Sewer Main. Price co LF 766 $3,140.60 $2,298.00 $6,825.06 $10,923.16
11 BASE Abandon Existing Manholes. Price compl EA 2 $2,170.00 $600.00 $4,098.00 $4,074.42
12 BASE Miscellaneous Excavation and Backfill with CY 50 $4,050.00 $1,250.00 $500.00 $1,750.00
13 BASE Miscellaneous Excavation and Backfill with CY 50 $2,375.00 $1,250.00 $250.00 $1,000.00
14 BASE Concrete Encasement. Price complete, in LF 100 $3,367.00 $4,000.00 $1,500.00 $4,655.00
15 BASE Clearing. Price complete, in place LS 1 $8,000.00 $16,500.00 $10,000.00 $4,000.00
16 BASE Rock Removal. Price complete, in place CY 75 $7,500.00 $75.00 $7,500.00 $2,982.75
TOTAL BASE BID $172,879.20 $188,188.00 $187,999.22 $191,580.86
17 ADD Demolish and Re-build Existing Drop Conr LS 1 $5,300.00 $1,500.00 $3,250.00 $4,672.95
TOTAL AMOUNT BID WITH ADD ITEM $178,179.20 $189,688.00 $191,249.22 $196,253.81
10% BID BOND SUBMITTED? Yes Yes Yes Yes

eBid eXchange Export

Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSIOI No. SS-201

Generated 2/15/2012 10:02 AM Eastern

Number Type Description Unit Of Measure Quantity Land Tech Enterprises Joao Bradley Construction Co., Inc. Trinity Excavating, Inc. Dirt work solutions
1 BASE Installation, Maintenance, and Removal o LS 1 $23,000.00 $16,000.00 $32,446.00 $18,520.00
2 BASE 8 Sanitary Sewer Main in Paved Areas. Pri LF 484 $43,560.00 $41,624.00 $40,472.08 $61,226.00
3 BASE 8 Sanitary Sewer Main in Non-Paved Area LF 814 $40,700.00 $45,584.00 $50,598.24 $50,671.50
4 BASE Manholes. Price complete, in place EA 8 $26,800.00 $30,400.00 $30,000.00 $13,200.00
5 BASE Drop Connection to Existing Manhole Exis LS 1 $2,900.00 $3,900.00 $2,800.00 $5,080.00
6 BASE 4 Laterals. Price complete, in place LF 99 $4,455.00 $6,336.00 $5,416.29 $15,048.00
7 BASE Cleanouts. Price complete, in place EA 6 $2,400.00 $3,000.00 $3,900.00 $1,200.00
8 BASE 8 Superpave 25 mm Base Course Paving. SY 240 $17,520.00 $12,000.00 $18,453.60 $18,513.60
9 BASE In-Kind Concrete Curb Replacement. Price LF 140 $5,600.00 $9,800.00 $6,720.00 $4,536.00
10 BASE Abandon Existing 8 Sewer Main. Price co LF 766 $3,830.00 $3,064.00 $6,748.46 $3,140.60
11 BASE Abandon Existing Manholes. Price compl EA 2 $1,940.00 $1,440.00 $1,250.00 $1,100.00
12 BASE Miscellaneous Excavation and Backfill wit CY 50 $2,500.00 $2,600.00 $1,500.00 $1,324.00
13 BASE Miscellaneous Excavation and Backfill wit CY 50 $1,250.00 $1,300.00 $1,100.00 $360.00
14 BASE Concrete Encasement. Price complete, in LF 100 $7,000.00 $6,200.00 $5,250.00 $1,540.00
15 BASE Clearing. Price complete, in place LS 1 $5,400.00 $5,000.00 $3,000.00 $5,750.00
16 BASE Rock Removal. Price complete, in place CY 75 $7,500.00 $16,125.00 $5,625.00 $13,275.00
TOTAL BASE BID $196,355.00 $204,373.00 $215,279.67 $214,484.70
17 ADD Demolish and Re-build Existing Drop Conr LS 1 $1,150.00 $4,600.00 $1,700.00 $5,080.00
TOTAL AMOUNT BID WITH ADD ITEM $197,505.00 $208,973.00 $216,979.67 $219,564.70
10% BID BOND SUBMITTED? Yes Yes Yes NO

eBid eXchange Export

Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSIOI No. SS-201

Generated 2/15/2012 10:02 AM Eastern

Number Type Description Unit Of Measure Quantity Betta Construction Co., LLC McKenney Construction JFC Contractors, Inc. Barwis Construction LLC
1 BASE Installation, Maintenance, and Removal o LS 1 $5,000.00 $17,699.00 $4,000.00 $19,970.03
2 BASE 8 Sanitary Sewer Main in Paved Areas. Pri LF 484 $62,678.00 $79,192.08 $67,760.00 $60,500.00
3 BASE 8 Sanitary Sewer Main in Non-Paved Area LF 814 $60,643.00 $34,595.00 $81,400.00 $50,500.56
4 BASE Manholes. Price complete, in place EA 8 $21,600.00 $31,200.00 $32,000.00 $25,046.48
5 BASE Drop Connection to Existing Manhole Exis LS 1 $6,750.00 $4,000.00 $11,000.00 $11,589.35
6 BASE 4 Laterals. Price complete, in place LF 99 $5,544.00 $2,400.75 $9,900.00 $9,766.35
7 BASE Cleanouts. Price complete, in place EA 6 $1,200.00 $1,350.00 $1,800.00 $1,162.44
8 BASE 8 Superpave 25 mm Base Course Paving. SY 240 $15,720.00 $25,200.00 $12,000.00 $19,348.80
9 BASE In-Kind Concrete Curb Replacement. Price LF 140 $5,600.00 $5,460.00 $7,000.00 $7,813.40
10 BASE Abandon Existing 8 Sewer Main. Price co LF 766 $5,362.00 $4,021.50 $3,830.00 $16,269.84
11 BASE Abandon Existing Manholes. Price compl EA 2 $2,000.00 $2,800.00 $3,000.00 $1,613.52
12 BASE Miscellaneous Excavation and Backfill wit CY 50 $2,500.00 $2,900.00 $1,750.00 $2,222.00
13 BASE Miscellaneous Excavation and Backfill wit CY 50 $2,500.00 $1,850.00 $1,250.00 $847.00
14 BASE Concrete Encasement. Price complete, in LF 100 $1,000.00 $3,600.00 $4,500.00 $5,200.00
15 BASE Clearing. Price complete, in place LS 1 $5,000.00 $8,800.00 $7,000.00 $17,952.21
16 BASE Rock Removal. Price complete, in place CY 75 $11,250.00 $8,625.00 $13,125.00 $8,250.00
TOTAL BASE BID $214,347.00 $233,693.33 $261,315.00 $258,051.98
17 ADD Demolish and Re-build Existing Drop Conr LS 1 $10,000.00 $5,800.00 $3,000.00 $11,553.15
TOTAL AMOUNT BID WITH ADD ITEM $224,347.00 $239,493.33 $264,315.00 $269,605.13
10% BID BOND SUBMITTED? Yes Yes Yes Yes

eBid eXchange Export

Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSIOI No. SS-201

Generated 2/15/2012 10:02 AM Eastern

Number Type Description Unit Of Measure Quantity Delaware Valley Utility Contractors, Inc Technivate Inc. Bulldog Construction Chester County Site Contractors
1 BASE Installation, Maintenance, and Removal o LS 1 $45,200.00 $35,362.00 $18,500.00 $29,704.38
2 BASE 8 Sanitary Sewer Main in Paved Areas. Pri LF 484 $44,528.00 $64,372.00 $65,340.00 $92,182.64
3 BASE 8 Sanitary Sewer Main in Non-Paved Area LF 814 $39,886.00 $40,700.00 $73,260.00 $34,407.78
4 BASE Manholes. Price complete, in place EA 8 $54,240.00 $27,392.00 $28,000.00 $19,945.84
5 BASE Drop Connection to Existing Manhole Exis LS 1 $7,960.00 $7,439.00 $8,500.00 $27,283.46
6 BASE 4 Laterals. Price complete, in place LF 99 $9,504.00 $5,247.00 $16,335.00 $16,272.63
7 BASE Cleanouts. Price complete, in place EA 6 $3,360.00 $3,174.00 $3,600.00 $1,227.30
8 BASE 8 Superpave 25 mm Base Course Paving. SY 240 $15,840.00 $25,440.00 $18,000.00 $9,511.20
9 BASE In-Kind Concrete Curb Replacement. Price LF 140 $8,120.00 $5,040.00 $5,880.00 $4,543.00
10 BASE Abandon Existing 8 Sewer Main. Price co LF 766 $11,490.00 $5,515.20 $4,596.00 $3,109.96
11 BASE Abandon Existing Manholes. Price compl EA 2 $3,400.00 $3,988.00 $2,800.00 $2,054.78
12 BASE Miscellaneous Excavation and Backfill wit CY 50 $3,125.00 $3,900.00 $2,500.00 $3,982.00
13 BASE Miscellaneous Excavation and Backfill wit CY 50 $2,050.00 $2,250.00 $1,500.00 $2,999.00
14 BASE Concrete Encasement. Price complete, in LF 100 $5,700.00 $5,350.00 $4,000.00 $3,450.00
15 BASE Clearing. Price complete, in place LS 1 $7,200.00 $6,663.00 $7,500.00 $8,873.88
16 BASE Rock Removal. Price complete, in place CY 75 $9,375.00 $27,525.00 $15,000.00 $32,892.00
TOTAL BASE BID $270,978.00 $269,357.20 $275,311.00 $292,439.85
17 ADD Demolish and Re-build Existing Drop Conr LS 1 $8,000.00 $11,639.00 $7,500.00 $7,613.00
TOTAL AMOUNT BID WITH ADD ITEM $278,978.00 $280,996.20 $282,811.00 $300,052.85
10% BID BOND SUBMITTED? Yes NO Yes Yes

eBid eXchange Export

Solicitation Chester County LOCKWOOD CHASE SANITARY SEWER DIVERSIOI No. SS-201

Generated 2/15/2012 10:02 AM Eastern

Number Type Description Unit Of Measure Quantity joseph t hardy and son inc
1 BASE Installation, Maintenance, and Removal o LS 1 $21,810.00
2 BASE 8 Sanitary Sewer Main in Paved Areas. Pri LF 484 $96,800.00
3 BASE 8 Sanitary Sewer Main in Non-Paved Area LF 814 $65,120.00
4 BASE Manholes. Price complete, in place EA 8 $56,000.00
5 BASE Drop Connection to Existing Manhole Exis LS 1 $24,390.00
6 BASE 4 Laterals. Price complete, in place LF 99 $11,880.00
7 BASE Cleanouts. Price complete, in place EA 6 $600.00
8 BASE 8 Superpave 25 mm Base Course Paving. SY 240 $15,000.00
9 BASE In-Kind Concrete Curb Replacement. Price LF 140 $4,200.00
10 BASE Abandon Existing 8 Sewer Main. Price co LF 766 $2,298.00
11 BASE Abandon Existing Manholes. Price compl EA 2 $600.00
12 BASE Miscellaneous Excavation and Backfill wit CY 50 $50.00
13 BASE Miscellaneous Excavation and Backfill wit CY 50 $50.00
14 BASE Concrete Encasement. Price complete, in LF 100 $100.00
15 BASE Clearing. Price complete, in place LS 1 $5,000.00
16 BASE Rock Removal. Price complete, in place CY 75 $7,500.00
TOTAL BASE BID $311,398.00
17 ADD Demolish and Re-build Existing Drop Conr LS 1 $3,500.00
TOTAL AMOUNT BID WITH ADD ITEM $314,898.00
10% BID BOND SUBMITTED? Yes