Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
January 10, 2011
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- ELECTION OF NEW OFFICERS
- RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Miller Environmental Report; Cost Summary Report; Change Orders – None; Other – Pennoni Continued Construction Services 1/06/11; Other – Letter to Worth 12/22/10; Other – Peco Damage To TVSS Unit
- RIDLEY CREEK INVOICES Brickhouse Environmental #5706, 1/03/11 $ 15,640.00; Pennoni, #459101, 12/22/10 $ 8,722.35
- CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES December 13, 2010; December 28, 2010
- APPROVAL OF INVOICES Pennoni, #459104, 12/22/10 $ 866.25; Pennoni, #459105, 12/22/10 $ 1,970.97; Pennoni, #459099, 12/22/10 $ 795.00
- LIAISON REPORTS
- FINANCIAL REPORTS December Report
- OLD BUSINESS
- GOALS 2010 Final Report; Comp. Plan Goals 10/05/10; 2011 Goals
- NEW BUSINESS E-Mail Protocol 12/30/10; ABC Packets Generation 12/30/10
- CAPACITY REQUESTS - None
- SEWER REPORTS Director of Public Works Report – December 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - 2010; Artesian Ridley Creek Report –2010
Monday, December 13, 2010
- 1 -
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST West Goshen Minutes 1/05/11; 12/22/10 Letter From Bob Adams
- PUBLIC COMMENT
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| January 1, 2011 | |
| February 09, 2011 - Jack | |
| May 11, 2011 - Fran | |
| August 10, 2011 - Joe | |
| November 9, 2011- Dana | |
| February 12, 2011 - Kevin |
Monday, December 13, 2010
- 2 -
Project Manager’s December 2010 Report
Executive Summary
Minimal progress was completed towards the electrical and general/mechanical punch list items was completed during December, however, both contractors addressed equipment issues identified during the month. The remaining items include the short circuit protection, coordination and arc flash studies labels for non-potable water hydrants, replacing two hour meters, instrument panel lamp and adjustment knob for a dissolved oxygen probe mounting bracket. Additional items were identified and brought to the attention of both contractors.
The SBR treatment process has been identified to contain excessive filamentous growth which has adversely impacted settleability of the solids within the SBR, an increase in solids in the SBR effluent and accumulation of solids throughout individual unit processes. On site Laboratory test data indicates that the biological processes as performing as intended for nutrient removal. Achievement of the existing permit discharge limitations is anticipated as well as those for the Siemens SBR performance warranty for total nitrogen and phosphorus. Foam control has included removal through a vacuum truck as well as the application of spray applying sodium hypochlorite to the foam during settle and idle periods. Monitoring the biological activity, reduction in filamentous growth and plant performance is ongoing. Improvement in the settleability is anticipated by the end of January.
The Siemens warranty performance testing of the treatment system has been postponed until the treatment process is performing as intended. The centrifuge dewatering system performance testing is rescheduled for January 10, 2011. Continued informal conversations with the facility inspector from PADEP have included on implementing the new NPDES final effluent discharge requirements during the first quarter 2011 (March/April timeframe). Prior to implementing the new discharge permit limitations, representatives from PADEP will be invited to visit the facility, review operations and provide official notification of the start date for the new effluent discharge permit limitations.
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
December 2010 Project Manager Report
To: East Goshen Municipal Authority Members
From: Scott A. Towler, P.E., Project Manager
Dave W. Evans, Project Manager
CC: Daniel P. Barbato, P.E., Authority Engineer
Date: January 6, 2011
Re: December 2010 – Project Manager Report for the Ridley Creek Capital Expansion Project:
- Punch List Items On December 9, 2010, Carl Jansen (Riordian Materials) served as the representative for Siemens to resolve the communication and programming connectivity for the aluminum sulfate and soda ash chemical feed pumps and Siemens SBR control panel.; ; On December 16, 2010, Wm. Clinger Corp. scheduled a technician from GE to address communication issue between the Siemens SBR control panel and the GE vfds for Blowers 3 and 4. The VFDs for blowers 3 and 4 were replaced (previous VFDs failed). It was determined that a factory setting on the VFDs was set to read volts rather than mill amps. The program was corrected the operation of the blowers and communication between the Siemens control panel and GE vfd verified. The technician from GE to tighten and verified that all wiring and connections on the “factory side” of the VFDs are secured as required. A written report is to be provided to Wm. Clinger Corp. with a copy provided to EGTMA.; The VFDs for blowers 3 and 4 were replaced (previous VFDs failed). It was determined that a factory setting on the VFDs was set to read volts rather than mill amps. The program was corrected the operation of the blowers and communication between the Siemens control panel and GE vfd verified.; The technician from GE to tighten and verified that all wiring and connections on the “factory side” of the VFDs are secured as required.; A written report is to be provided to Wm. Clinger Corp. with a copy provided to EGTMA.; On December 9, 2010,
- Erosion and Sediment Controls East Goshen Township Municipal Authority Worth & Company, Inc. continues to perform inspections of the E&S controls as required after a storm event. The E&S plan is anticipated to remain in effect until the Spring of 2011 at which time representatives of the Conservation District can provide an inspection and confirmation of the established cover.
Page 1 of 4
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
December 2010 Project Manager Report
- Payment Requests Worth & Company has requested the remaining balance of $125,000 contract retainage sum. The Authority declined to pay the sum during the month of December, 2010.
- Release of Liens No release of liens for equipment and subcontractors for Worth & Company were submitted during December 2010.; No release of liens for equipment and subcontractors for Wm. H. Clinger Corporation were submitted during December 2010.
- Meetings On December 2, 2010, prepared for and attended biweekly construction progress meeting at the East Goshen Township building.; On December 13, 2010, prepared for and attended the monthly Municipal Authority meeting.; On December 16, 2010, prepared for and attended the biweekly construction progress meeting at the East Goshen Township building.; On December 21, 2010, attended a meeting with Miller Environmental and East Goshen Township Municipal Authority for preparation of the transition of plant operations.; On December 22, 2010, provided coordination and technical assistance to EGTMA and Miller Environmental to assist with transition of plant operations beginning January 1, 2011.; On December 23, 2010, provided coordination and technical assistance to EGTMA and Miller Environmental to assist with transition of plant operations beginning January 1, 2011.; On January 1, 2011, participated in the transition and orientation of plant operation and maintenance responsibilities to Miller Environmental.
- Correspondence No formal letters were issued during the month
- Extras Identified During the month None
Page 2 of 4
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
December 2010 Project Manager Report
- Potential Receipts Pending Worth & Company credit for the reduced labor and schedule regarding the installation of the frost barrier within the internal perimeter of the new treatment building.; Discussion of the cost benefits to Worth & Company regarding the BFP and construction of a temporary structure are recommended for discussion.
- Issues for Reconciliation Verify influent diurnal organic loadings, specifically between 5:00 AM and Noon and Noon to 5:00 PM; Pennoni Associates, Inc. formal letter response to East Goshen Township Municipal Authority regarding Clinger’s March 15, 2010 letter.; Worth & Company issued two letters dated March 26, 2010 requesting contract extension of 22 for delays attributed to material supplied by Siemens Water Technologies and 65 days for delays in the new permanent power supply (PECO) to the facility. The Municipal Authority denied the requested extensions. A meeting between EGTMA and Worth & Company was conducted on December 17, 2010 to address Worth & Company’s concerns.; The Municipal Authority denied the requested extensions.; A meeting between EGTMA and Worth & Company was conducted on December 17, 2010 to address Worth & Company’s concerns.; Replacement hour meters on Siemens SBR control panel (Worth & Company item).; Utility water system low level alarm and/or pressure transducer requires adjustment. The control panel light is on, however, no alarm condition appears to be present.; Sludge flow meter for the centrifuge is reported to not have a feed back signal from the flow meter to the centrifuge controls. The flow meter local transmitter displays a negative flow value.; Confirmation of operation of the automatic telescopic valve for sludge holding tank number 1. The valve’s descent rate doesn’t appear to be consistent with the programmed rate (the circuit board for this valve was previously replaced under warranty).; Investigation of the low UV lamp output for UV Bank number 2.; Scheduling for the third (last) Siemens SBR Jet Tech training event (Contract Section 1.14, page 11100-12); The downstream transducer for the Fine Screen is displaying a higher water level than the upstream transducer. In addition, the display is a percentage rather than as inches.; The transducer water level readout should be verified against real time measurements. The differential set point for the fine screen should be adjusted as per the manufacturer’s recommendation.
Page 3 of 4
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
December 2010 Project Manager Report
- Concerns to Monitor Grit and debris accumulation in the influent flow channel prior to the grinder and screening unit. The Township Staff removed a total of forty six (46) 5-gallon buckets of debris during the period of one (1) month.; Separation of internal recycle flow volumes from the influent flow meter for accurate determination of the influent hydraulic loading. The PADEP Chapter 94 report influent hydraulic loadings should not include internal recycle flow.; Expenses and or schedule delays related to resolving the conflict with the sludge conveyor and sludge platform as identified on June 29, 2010. Corrective actions required engineering review, approval and modification to the centrifuge support stand system. Additional changes were required as of July 27, 2010, which were later approved on July 28,, 2010.; Items for discussion as contained with Tim Daily’s November 17, 2010 memorandum, issued on November 23, 29010, with respect to the plant operation and operational status of equipment.; Items for discussion as contained with Steve Seacrist’s email dated November 9, 2010 with respect to the facility power failure and main circuit breaker tripping.; Plant operations for compliance with existing discharge permit. The treatment plant has excessive filamentous growth which has adversely impacted settleability and increased the effluent TSS. The biological process is functioning as intended as confirmed by process control monitoring. Siemens has been contacted for technical assistance on several occasions and responded with assistance.; The treatment plant has excessive filamentous growth which has adversely impacted settleability and increased the effluent TSS.; The biological process is functioning as intended as confirmed by process control monitoring.; Siemens has been contacted for technical assistance on several occasions and responded with assistance.; Management and removal of foam/scum produced in the SBRs.
- Equipment Start-up / Testing The Siemens warranty performance testing is scheduled to begin at a date chosen by the Municipal Authority during January 2011. The test is summarized as a fourteen consecutive day sampling event of the influent to the SBRs and final effluent outfall.; The centrifuge performance test conducted on January 3, 2011 experienced conditions not present during the initial start up. The test has been rescheduled for January 10, 2011.
Page 4 of 4
EGMA 1100
Pennoni
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Daniel Barbato, P.E.
Authority Engineer
DATE: January 6, 2010
SUBJECT: Engineer’s Report
RCSTP Upgrade and Expansion
- Construction phase services continue with punchlist monitoring, final review of operations and maintenance submittals, startup assistance and troubleshooting, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Brickhouse and the Township, and review of contractor Payment Requests.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- A request for supplemental budget to cover the extension of our Continued Construction Services is submitted under separate cover.
- Worth and Company and Clinger Corporation are working on punchlist completion and outstanding items are expected to be complete this month.
- Pennoni has completed review of all Operations and Maintenance submittals for Worth and Clinger and has provided comments back to both contractors. We received revised submittals from Worth on January 5.
- Pennoni will begin working on the renewal for the discharge permit, which expires in September. DEP was contacted for the paperwork.
I/I Metering Project
- The Township continues to meter flows at selected locations. Meters are in operation in at new locations as recommended, and we will review meter data as it is submitted.
Ridley Creek Consent Order
- The next report is due to DEP in March of 2011. No comments were received on the September report submitted to DEP.
Page 1 of 2
C:\Documents and Settings\dbarbato\My Documents\Memo to EGMA Board 2011-01-06.docx
EGMA 1100
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- We received an extension from DEP to complete the response to their comments by February 28, 2011. Several of the DEP comments require action by West Goshen including adoption of a Resolution, review by the Planning Commission, and flow data from the Authority. The extension will allow for time to obtain and submit the required Resolution and other documentation. We have completed all revisions to the narrative and prepared a comment response letter, and we are only awaiting required documentation from West Goshen, East Goshen Planning Commission, and the Chester County Health Department before formally submitting to DEP. We have forwarded the documentation required by West Goshen and East Goshen under separate cover. We will be informally submitting the revised narrative and comment response letter to DEP this week so they can begin their review prior to the formal submission in February.
Marydell PS Elimination Planning
- The draft report for the Act 537 Plan Revision is nearly complete. We will submit the draft report to the Authority for review by the end of January. Following the Authority’s review, we will make the required Component 4 submissions to the East Goshen Planning Commission, West Goshen Planning Commission, Chester County Planning Commission, and Chester County Health Department.
Applebrook Comprehensive Groundwater Evaluation
- The final report was provided to the Authority for submission to DEP.
Page 2 of 2
C:\Documents and Settings\dbarbato\My Documents\Memo to EGMA Board 2011-01-06.docx
MILLER ENVIRONMENTAL, INC.
The Water and Wastewater Authority®
6 January 2011
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Attn: Mr. Rick Smith, Township Manager
Re: First Monthly Report
Dear Mr. Smith:
Obviously, after only 5 days of operation this first month, this report to the Authority is limited.
The first of the samples taken Wednesday the 5th by Atlantic Coast Lab will be analyzed and reported along with all others in each succeeding report. This will include copies of the E-DMR.
Miller Environmental is in the process of analyzing & preparing all records, documentation, procedures to unsure, permit compliance, and efficient plant operation. The next month should include Siemans’ performance evaluation, and Alfa/Laval centrifuge training.
Filamentous bacteria removal/control is underway and new set-points for control are being considered. New lab equipment has been ordered and received, and standard operating procedures are being developed.
Mark Miller and his crew have been invaluable in efforts to restore the WWTP to conditions prior to the Alum incident.
Thank you,
[signature]
William Ronyack
Operations Manager
320 S. 17TH STREET ▪ READING, PA 19602 ▪ (P) 610.376.9162 ▪ (F) 610.376.9164
Includes bills paid at 12/13 meetings
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY
January 10, 2011
| Name | Budget or Contract amt. | This Month | To Date | Balance on Budget or Contract | % of work completed |
|---|---|---|---|---|---|
| RECEIPTS | |||||
| Bond | $9,500,000.00 | $0.00 | $9,500,000.00 | ||
| Pennoni (rechargable) | $20,000.00 | $0.00 | $20,000.00 | ||
| Grant | $464,195.00 | $0.00 | $464,195.00 | ||
| RECEIPTS TOTAL | $9,984,195.00 | $0.00 | $9,984,195.00 | $0.00 | 100.00% |
| EXPENSES | |||||
| Borrowing costs | $52,250.00 | $0.00 | $52,250.00 | ||
| Worth | $7,865,400.00 | $0.00 | $7,645,366.12 | $220,033.88 | 97.20% |
| change orders | $18,932.66 | $0.00 | $0.00 | $18,932.66 | 0.00% |
| Clinger | $974,000.00 | $0.00 | $950,777.64 | $23,222.36 | 97.62% |
| change orders | $33,312.24 | $0.00 | $0.00 | $33,312.24 | 0.00% |
| Pennoni (Inspection) (05) | $136,200.00 | $0.00 | $136,197.62 | $2.38 | 100.00% |
| Pennoni (Continued Services) (10) | $192,320.00 | $4,097.75 | $187,648.32 | $4,671.68 | 97.57% |
| Pennoni (Rechargeable) (06) | $20,000.00 | $0.00 | $12,961.75 | $7,038.25 | 64.81% |
| Brickhouse | $175,000.00 | $9,947.50 | $189,146.25 | -$14,146.25 | 108.08% |
| Extras | |||||
| Capital | $424,584.10 | $18,217.71 | $142,852.58 | $281,731.52 | 33.65% |
| Capital (Identified but not paid) | $80,196.00 | $0.00 | $0.00 | $80,196.00 | 0.00% |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $0.00 | $11,825.18 | $174.82 | 98.54% |
| EXPENSES TOTAL | $9,984,195.00 | $32,262.96 | $9,329,025.46 | $655,169.54 | 93.44% |
We have identified $41,357 in potential extras.
Retainage (10% until 50% of the project is done then it drops back to 5%)
| Worth | $224,058.22 | 2.5% |
|---|---|---|
| Clinger | $51,794.25 | 5% |
| Total | $275,852.47 |
SUMMARY V2
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 011011.xls
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL
January 10, 2011
Worth
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 2/9/2009 | $561,150.00 | Worth & Company | Application #1 | |
| 3/9/2009 | $480,825.00 | Worth & Company | Application #2 | |
| 4/9/2009 | $768,780.00 | Worth & Company | Application #3 | |
| 5/8/2009 | $125,352.90 | Worth & Company | Application #4 | |
| 5/31/2009 | $485,103.12 | Worth & Company | Application #5 | |
| 6/30/2009 | $267,975.00 | Worth & Company | Application #6 | |
| 7/31/2009 | $138,217.50 | Worth & Company | Application #7 | |
| 8/31/2009 | $679,793.40 | Worth & Company | Application #8 | |
| 9/30/2009 | $504,310.98 | Worth & Company | Application #9 | |
| 9/30/2009 | $222,861.55 | Worth & Company | Application #10 (5% retainage) | |
| 10/31/2009 | $724,089.05 | Worth & Company | Application #11 | |
| 11/30/2009 | $379,360.17 | Worth & Company | Application # 12 | |
| 12/31/2009 | $374,772.62 | Worth & Company | Application #13 | |
| 1/31/2010 | $207,881.86 | Worth & Company | Application # 14 | |
| 2/28/2010 | $69,077.35 | Worth & Company | Application # 15 | |
| 3/31/2010 | $75,857.50 | Worth & Company | Application # 16 | |
| 4/30/2010 | $170,263.75 | Worth & Company | Application # 17 | |
| 5/31/2010 | $178,290.62 | Worth & Company | Application #18 | |
| 6/30/2010 | $299,633.25 | Worth & Company | Application #19 | |
| 7/30/2010 | $426,170.00 | Worth & Company | Application #20 | |
| 8/31/2010 | $227,050.00 | Worth & Company | Application #21 | |
| 9/30/2010 | $54,520.50 | Worth & Company | Application 22 | |
| 10/31/2010 | $224,000.00 | Worth & Company | Application #23 | |
| $7,645,336.12 | $7,645,336.12 |
Clinger
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 4/9/2009 | $22,152.64 | Clinger | Application #1 | |
| 5/8/2009 | $15,714.77 | Clinger | Application #2 | |
| 5/31/2009 | $77,973.43 | Clinger | Application #3 | |
| 6/30/2009 | $12,567.46 | Clinger | Application #4 | |
| 8/30/2009 | $10,855.98 | Clinger | Application #5 | |
| 9/30/2009 | $111,255.75 | Clinger | Application #6 | |
| 10/31/2009 | $59,344.83 | Clinger | Application #7 | |
| 11/30/2009 | $145,354.05 | Clinger | Application # 8 | |
| 12/31/2009 | $94,727.00 | Clinger | Application # 9 | |
| 1/31/2010 | $139,092.94 | Clinger | Application #10 | |
| 2/28/2010 | $58,514.64 | Clinger | Application #11 | |
| 2/28/2010 | $41,530.78 | Clinger | Application #12 (5% retainage) | |
| $13,575.79 | Clinger | Application #13 | ||
| 5/2/2010 | $34,539.38 | Clinger | Application # 14 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 011011.xls DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 6/30/2010 | $40,633.52 | Clinger | Application #15 | |
| 8/1/2010 | $42,347.24 | Clinger | Application # 16 | |
| 8/31/2010 | $30,597.44 | Clinger | Application #17 | |
| $950,777.64 | $950,777.64 |
Pennoni
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| ? | $712.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU ? | |
| 10/30/2008 | $943.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 10/19/08 | |
| 12/5/2008 | $18,115.98 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 11/30/08 | |
| 1/15/2009 | $12,929.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 12/28/08 | |
| 2/5/2009 | $13,352.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $31,288.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $29,010.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $22,436.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| 7/29/2009 | $3,528.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 7/19/09 | |
| 12/30/2010 | $16,482.50 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 12/31/10 | |
| 1/29/2010 | $24,224.58 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 1/17/10 | |
| 2/23/2010 | $13,057.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 2/14/10 | |
| 4/1/2010 | $19,243.40 | PENNONI ASSOCIATES INC. | ||
| 5/5/2010 | $18,810.50 | PENNONI ASSOCIATES INC. | Through 4/18/2010 | |
| 5/25/2010 | $19,287.50 | PENNONI ASSOCIATES INC. | Through 5/16/2010 | |
| 6/29/2010 | $17,901.25 | PENNONI ASSOCIATES INC. | Through 6/20/10 | |
| 7/29/2010 | $17,302.63 | PENNONI ASSOCIATES INC. | Through 7/18/2010 | |
| 8/26/2010 | $12,393.25 | PENNONI ASSOCIATES INC. | Through 8/15/2010 | |
| 9/29/2001 | $12,521.81 | PENNONI ASSOCIATES INC. | Through 9/19/2010 | |
| 10/27/2010 | $12,326.15 | PENNONI ASSOCIATES INC. | Through 10/17/2010 | |
| 11/23/2011 | $4,097.75 | PENNONI ASSOCIATES INC. | Through 11/7/2010 | |
| $319,964.72 | $319,964.72 |
Pennoni (rechargeable)
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 2/5/2009 | $2,840.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $4,934.75 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $3,777.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $1,409.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| $12,961.75 | $12,961.75 |
Brickhouse
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 5/12/2009 | $2,127.50 | BRICKHOUSE | Apr-09 | |
| 6/1/2009 | $8,452.50 | BRICKHOUSE | May-09 | |
| 7/1/2009 | $7,791.25 | BRICKHOUSE | Jun-09 | |
| 8/3/2009 | $9,315.00 | BRICKHOUSE | Jul-09 | |
| 9/1/2009 | $7,762.50 | BRICKHOUSE | Aug-09 | |
| 10/1/2009 | $7,417.50 | BRICKHOUSE | Sep-09 | |
| 11/2/2009 | $7,072.50 | BRICKHOUSE | Oct-09 | |
| 12/1/2009 | $7,963.75 | BRICKHOUSE | Nov-09 | |
| 1/4/2010 | $7,762.50 | BRICKHOUSE | Dec-09 | |
| 2/1/2010 | $7,618.75 | BRICKHOUSE | Jan-10 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 011011.xls DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 3/1/2010 | $7,417.50 | BRICKHOUSE | Feb-10 | |
| 4/1/2010 | $10,005.00 | BRICKHOUSE | Mar-10 | |
| 5/3/2010 | $11,931.25 | BRICKHOUSE | Apr-10 | |
| 6/1/2010 | $10,321.25 | BRICKHOUSE | May-10 | |
| 7/1/2010 | $11,845.00 | BRICKHOUSE | Jun-10 | |
| 8/2/2010 | $14,911.25 | BRICKHOUSE | Jul-10 | |
| 9/1/2010 | $14,087.50 | BRICKHOUSE | Aug-10 | |
| 10/1/2010 | $10,695.00 | BRICKHOUSE | Sep-10 | |
| 10/1/2010 | $6,785.00 | BRICKHOUSE | Clinger Matter | |
| 11/1/2010 | $8,826.25 | BRICKHOUSE | Oct-10 | |
| 11/1/2010 | $571.50 | BRICKHOUSE | Clinger Matter | |
| 12/1/2011 | $9,947.50 | BRICKHOUSE | Nov-11 | |
| $190,627.75 | $190,627.75 | |||
| Extras - Capital - Paid | ||||
| 12/22/2008 | $44.98 | EAST GOSHEN TOWNSHIP | REIMBURSE GEN.FUND FOR OFFICE DEPOT | |
| 12/31/2008 | $88.00 | FASTSIGNS | RED ON WHITE ALUM. SIGNS | |
| 1/12/2009 | $177.00 | FASTSIGNS | SIGNS - PLEASE AVOID TOWNE DR... | |
| 12/1/2008 | $36.00 | GREAT VALLEY LOCKSHOP | KEYS FOR CONTRACTOR | |
| 12/8/2008 | $160.80 | GREAT VALLEY LOCKSHOP | PADLOCKS, REKEY CYLINDERS & KEYS | |
| 12/29/2008 | $474.82 | HANSON AGGREGATES INC | 36.95 TONS SUBBASE AGGREGATE | |
| 12/31/2008 | $908.00 | HANSON AGGREGATES INC | 70.66 TONS SUBGRADE 2 AGGREGATE | |
| 12/15/2008 | $2,089.39 | LENNI ELECTRIC CORPORAT | TEMP SERV. FOR TRAILER - RIDLEY CRK | |
| 12/31/2008 | $120.00 | LENNI ELECTRIC CORPORAT | SEWER PLANT - GUY WIRE RELOCATE | |
| 12/29/2008 | $7,865.00 | MACANGA INC. | TRUCK & TRACKHOE RENTAL 12/5-12/18 | |
| 12/1/2008 | $2,466.00 | PATTERSON, MICHAEL J. | MATERIALS & LABOR - SPLIT RAIL FENCE | |
| 12/1/2008 | $4,907.72 | PIPE XPRESS INC. | COPPER TUBING, BRASS COMP. COUPLING | |
| 12/15/2008 | $813.74 | PIPE XPRESS INC. | BURIAL HYDRANT, BRASS CURB STOP, & | |
| 12/29/2008 | $129.00 | RAM-T CORPORATION | 2 FT. SILT FENCE | |
| 12/1/2008 | $1,183.00 | RANSOME RENTAL COMPAN | CATERPILLAR - TRUCK LOADER RENTAL | |
| 12/8/2008 | $3,960.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 11/13-11/25/08 | |
| 12/29/2008 | $908.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15 - 12/18/08 | |
| 12/31/2008 | $1,044.85 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15-12/16/08 | |
| 12/8/2008 | $119.95 | SAFETY SOLUTIONS INC. | MEDICAL SUPPLIES | |
| 12/1/2008 | $635.60 | US MUNICIPAL SUPPLY INC. | CUSTOM SIGNS - RIDLEY CREEK TREATMT | |
| 12/31/2008 | $157.50 | GAWTHROP GREENWOOD | LEGAL | |
| 1/31/2009 | $936.50 | GAWTHROP GREENWOOD | LEGAL | |
| 3/19/2009 | $1,246.64 | HAMMOND & MCCMLOSY | WATER SERVICE | |
| 3/31/2009 | $1,254.00 | HAMMOND & MCCOMLOSY | WATER PIPING | |
| 4/2/2009 | $274.21 | PIPE XPRESS INC. | YARD HYDRANT #2 | |
| 4/2/2009 | $1,910.28 | HAMMOND & MCCOMLOSY | WATER PIPING | |
| 5/11/2009 | $158.69 | US MUNICIPAL SUPPLY INC. | 3 SIGNS | |
| 4/30/2009 | $264.86 | LENNI ELECTRIC CORPORAT | WIRED HOT WATER HEATER | |
| 5/31/2009 | $133.00 | GAWTHROP GREENWOOD | LEGAL | |
| 6/30/2009 | $304.00 | GAWTHROP GREENWOOD | LEGAL | |
| 7/17/2009 | $1,481.00 | EAST GOSHEN TOWNSHIP | BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE) | |
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 011011.xls
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 9/10/2009 | $254.85 | AGWAY | TREE STAKES AND PEAT MOSS | |
| 8/25/2009 | $1,855.00 | HARMONY HILL NURSERIES | 16 TREES | |
| 8/31/2009 | $836.00 | GAWTHROP GREENWOOD | 2 MONTH LEGAL | |
| 11/19/2009 | $314.00 | VIMCO | SEALER FOR FLOORS | |
| 10/31/2009 | $285.00 | GAWTHROP GREENWOOD | LEGAL | |
| 12/31/2010 | $1,414.97 | L/B water | YARD HYDRANT #2 | |
| 12/18/2009 | $443.48 | Grainger | Hose Reel 1 inch | |
| 12/18/2009 | $267.98 | Grainger | Hose Reel 3/4 inch | |
| 2/2/2010 | $789.45 | Fisher Scientific | Lab Equipment | |
| 2/28/2010 | $57.00 | GAWTHROP GREENWOOD | LEGAL | |
| 3/15/2010 | $103.96 | Matthews Ford | Van rental | |
| 3/31/2010 | $275.50 | Grainger | Hose | |
| 3/31/2010 | $247.00 | GREAT VALLEY LOCKSHOP | 6 locks | |
| 4/7/2010 | $70.15 | Grainger | Shelving | |
| 4/14/2010 | $641.98 | Continetal Fire & Safety | 3" & 1.75" Hose | |
| 4/15/2010 | $1,127.48 | Grainger | Phone | |
| 4/16/2010 | $28.58 | Water Pollution Biology | Michael Geradi - Talk | |
| 3/17/2010 | $1,092.01 | McNichols | Safety Grating | |
| 2/22/2010 | $1,104.50 | HAMMOND & MCCMLOSY | WATER LINE OFFICE | |
| 5/5/2010 | $1,078.38 | HAMMOND & MCCMLOSY | Hose fitting in storage room | |
| 5/5/2010 | $270.10 | Fisher Scientific | DESICCATOR & OVEN | |
| 5/3/2010 | $2,329.17 | Fisher Scientific | FURNACE | |
| 5/12/2010 | $1,485.63 | USA Blue book | beakers | |
| 5/21/2010 | $456.81 | Marco | 3 10Lb dry Chem FX | |
| 4/29/2010 | $258.00 | Staples | office equipment | |
| 5/9/2010 | $142.47 | GAWTHROP GREENWOOD | Legal | |
| 5/31/2010 | $1,862.00 | Aqua Wastewater Mgt | Sludge from DAVCO | |
| 5/15/2010 | $39,937.70 | PIPE XPRESS INC. | pipe | |
| 6/30/2010 | $126.63 | GREAT VALLEY LOCKSHOP | locks | |
| 6/15/2010 | $204.40 | O'Rourke and Sons | Bend counter tops | |
| 6/8/2010 | $150.00 | PENNONI | Soda Ash | |
| 6/29/2010 | $615.00 | Office Depot | Printer | |
| 7/20/2010 | $99.99 | Office Depot | Printer cartridge | |
| 7/16/2010 | $50.39 | Newtown Office Supply | Desk | |
| 7/27/2010 | $649.00 | GAWTHROP GREENWOOD | Legal | |
| 7/31/2010 | $589.00 | Fastenal | Chain | |
| 6/29/2010 | $193.93 | LENNI ELECTRIC CORPORAT | Lights | |
| 6/29/2010 | $1,019.00 | HAMMOND & MCCMLOSY | sink | |
| 7/12/2010 | $328.70 | Hach | cable | |
| 7/15/2010 | $154.23 | Hach | Combo | |
| 7/16/2010 | $347.26 | Northern | Air Compressor | |
| 8/8/2010 | $1,599.97 | GAWTHROP GREENWOOD | LEGAL | |
| 8/31/2010 | $1,310.00 | Office Depot | White board | |
| 8/3/2010 | $43.27 | Office Depot | White board | |
| 8/3/2010 | $37.08 | PIPE XPRESS INC. | pipe | |
| 8/31/2010 | $2,623.51 |
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 011011.xls
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 9/1/2010 | $465.02 | PIPE XPRESS INC. | pipe | |
| 8/25/2010 | $357.50 | Main Line Concrete | Concrete | |
| 9/30/2010 | $1,242.50 | GAWTHROP GREENWOOD | LEGAL | |
| 10/7/2010 | $665.00 | O'Rourke and Sons | AC stand | |
| 10/18/2010 | $2,531.00 | Blosenski | Dumpster | |
| 10/13/2010 | ($105.00) | Power Pro | pallet credit | |
| 10/5/2010 | $2,073.90 | Power Pro | block and pallet charge | |
| 10/27/2010 | $17.50 | Power Pro | Re-bar | |
| 10/18/2010 | $577.93 | Martin Limestone | Stone | |
| 10/18/2010 | $296.35 | Martin Limestone | Stone | |
| 10/18/2010 | $299.83 | Martin Limestone | Stone | |
| 10/20/2010 | $270.75 | VIMCO | concrete products | |
| 10/20/2010 | $608.00 | RANSOME RENTAL COMPAN | Cat rental | |
| 10/25/2010 | $1,984.00 | RANSOME RENTAL COMPAN | Rental | |
| 10/5/2010 | $571.88 | Yerkes | PL Survey | |
| 10/23/2010 | $212.40 | Grainger | Door Parts | |
| 9/20/2010 | $88.32 | Yale Electric | Parts | |
| 9/21/2010 | $114.76 | Yale Electric | Parts | |
| 9/17/2010 | $450.00 | Steven Bahnatka | Wall Sign | |
| 9/7/2010 | $4,190.00 | M&S Service | Alarm system | |
| 9/10/2010 | $851.22 | HAMMOND & MCCMLOSY | HW heater | |
| 8/25/2010 | $337.50 | Main Line Concrete | side walks | |
| 9/1/2010 | $465.02 | PIPE XPRESS INC. | Roof Drains | |
| 9/7/2010 | $86.25 | PIPE XPRESS INC. | Water supply | |
| 9/14/2010 | $388.60 | EAST GOSHEN TOWNSHIP | Reimburse GF for Gutter Parts | |
| 11/18/2010 | $2,474.04 | Fastenal | SS chain for lifting pumps | |
| 11/5/2011 | $1,828.36 | Highway | Blacktop | |
| 11/5/2011 | $1,841.53 | Highway | Blacktop | |
| 11/18/2011 | $260.42 | Highway | Blacktop | |
| 11/18/2010 | $1,147.06 | Highway | Blacktop | |
| 11/30/2011 | $171.00 | GAWTHROP GREENWOOD | Legal Clinger | |
| 11/30/2011 | $720.00 | GAWTHROP GREENWOOD | Legal | |
| 11/5/2010 | $3,136.40 | Independence | Blacktop | |
| 11/5/2011 | $4,202.99 | Independence | Blacktop | |
| 10/27/2010 | $17.50 | Power Pro | Re bar | |
| 10/18/2010 | $1,464.80 | Silvi | Concrete ( 3 invoices) | |
| 11/2/2010 | $1,125.21 | $18,389.31 | Reilly and Sons | Fuel |
| Total | $142,852.58 | $142,852.58 | ||
| Extras - Capital - Identified capital extras that have not been paid | ||||
| $20,396.00 | Driveway Restoration | |||
| $3,300.00 | Restoration of parking area | |||
| $50,000.00 | Paving at RCSTP (we received a credit from Worth) | |||
| $6,500.00 | Audit | |||
| Total | $80,196.00 | $80,196.00 | ||
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 011011.xls
Trailer, Phone, Porta Potty & Internet
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 12/15/2008 | $1,039.10 | ACTON MOBILE INDUSTRIES | RENTAL MOBILE OFFICE | |
| 12/22/2008 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - THRU 1/19/09 | |
| 1/21/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 1/20-2/20/09 | |
| 2/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 2/20- 3/20/09 | |
| 3/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 3/20 - 4/19 | |
| 4/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 4/20 - 5/19 | |
| 5/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 5-20 - 6/19 | |
| 6/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 6/20 - 7/19 | |
| 7/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 7/20 to 8/19 | |
| 8/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 8/20/ to | |
| 9/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | ||
| 10/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 11/19 | |
| 11/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 12/19 | |
| 12/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 1/19 | |
| 1/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 2/19/10 | |
| 2/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 3/19/10 | |
| 3/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 4/19 | |
| 4/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 5/19 | |
| 5/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 6/19 | |
| 6/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 7/19 | |
| 7/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 8/19 | |
| 9/20/2010 | $305.00 | ACTON MOBILE INDUSTRIES | Removal | |
| $6,126.10 | $6,126.10 | |||
| 12/15/2008 | $140.00 | POTTY QUEEN | RENTAL PORTABLE TOILET - RIDLEY CRK | |
| 12/22/2008 | $64.47 | POTTY QUEEN | RENTAL TOILET 12/23-1/10/08 | |
| 2/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 2/8-3/7 | |
| 3/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 3/8-4/4 | |
| 4/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 4/5-5/2 | |
| 5/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET ???? | |
| 7/26/2009 | $95.00 | POTTY QUEEN | RENTAL 7/26 TO 8/22 | |
| 8/23/2009 | $95.00 | POTTY QUEEN | Rental 8/23 to 9/19 | |
| 9/20/2009 | $95.00 | POTTY QUEEN | RENTAL 9/20 to 10/17 | |
| 10/18/2009 | $95.00 | POTTY QUEEN | 10/18/09 to 11/14/09 | |
| 11/14/2009 | $95.00 | POTTY QUEEN | 11/15 to 12/13 | |
| 12/13/2009 | $95.00 | POTTY QUEEN | 12/13 to 1/9/10 | |
| 1/10/2010 | $95.00 | POTTY QUEEN | 1/10/10 to 2/6/10 | |
| 2/7/2010 | $95.00 | POTTY QUEEN | 2/7/10 to 3/6/10 | |
| 3/7/2010 | $95.00 | POTTY QUEEN | 3/7 to 4/3 | |
| 4/4/2010 | $95.00 | POTTY QUEEN | 4/4 to 5/1 | |
| 5/2/2010 | $98.80 | POTTY QUEEN | 5/2 to 5/29 | |
| 5/30/2010 | $96.90 | POTTY QUEEN | 5/30 to 6/26 | |
| 6/30/2010 | $96.90 | POTTY QUEEN | 6/27 to 7/24 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 011011.xls DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 7/28/2010 | $96.90 | $1,923.97 | POTTY QUEEN | 7/25 to 8/21 |
| 12/22/2008 | $174.65 | VERIZON -7041 | NOVEMBER 25 - DECEMBER 6, 2008 | |
| 1/7/2009 | $137.87 | VERIZON -7041 | BILLING DATE 1/07/09 | |
| 2/7/2009 | $130.34 | VERIZON -7041 | BILLING DATE 2/07/09 | |
| 3/7/2009 | $133.97 | VERIZON -7041 | BILLING DATE 3/7/09 | |
| 4/7/2009 | $136.00 | VERIZON -7041 | BILLING DATE 4/7/09 | |
| 5/7/2009 | $137.66 | VERIZON -7041 | BILLING DATE 5/7/09 | |
| 6/7/2009 | $178.47 | VERIZON -7041 | BILLINGDATE 6/7/2009 | |
| 7/7/2009 | $145.21 | VERIZON -7041 | Billing Date 7/7/09 | |
| 8/7/2009 | $134.44 | VERIZON -7041 | Billing date 8/7/09 | |
| 9/7/2009 | $132.93 | VERIZON -7041 | billing date 9/7/09 | |
| 10/7/2009 | $133.43 | VERIZON -7041 | Billing date 10/7/09 | |
| 11/7/2009 | $133.79 | VERIZON -7041 | Billing date 11/7/09 | |
| 12/7/2009 | $136.76 | VERIZON -7041 | Billing date 12/7/09 | |
| 1/7/2010 | $135.11 | VERIZON -7041 | Billing date 1/7/10 | |
| 2/7/2010 | $134.35 | VERIZON -7041 | Billing date 2/7/10 | |
| 3/7/2010 | $134.34 | VERIZON -7041 | Billing date 3/7/10 | |
| 4/7/2010 | $134.72 | VERIZON -7041 | Billing date 4/7/10 | |
| 5/7/2010 | $136.37 | VERIZON -7041 | billing ddate 5/7/2010 | |
| 6/7/2010 | $134.06 | VERIZON -7041 | Billing date 6/7/10 | |
| 7/7/2010 | $134.18 | VERIZON -7041 | Billing date 7/7/10 | |
| $2,788.65 | $2,788.65 | |||
| 8/31/2009 | $286.56 | VERIZON | INTERNET (FIRST BILL) | |
| 9/28/2009 | $69.99 | VERIZON | INTERNET | |
| 10/28/2009 | $69.99 | VERIZON | INTERNET | |
| 11/28/2009 | $69.99 | VERIZON | INTERNET | |
| 12/28/2009 | $69.99 | VERIZON | INTERNET | |
| 1/28/2010 | $69.99 | VERIZON | INTERNET | |
| 2/28/2010 | $69.99 | VERIZON | INTERNET | |
| 3/28/2010 | $69.99 | VERIZON | INTERNET | |
| 4/28/2010 | $69.99 | VERIZON | INTERNET | |
| 5/28/2010 | $69.99 | VERIZON | INTERNET | |
| 6/28/2010 | $69.99 | VERIZON | INTERNET | |
| $986.46 | $986.46 | |||
| Trailer, Phone, Porta Potty & Internet Total | $11,825.18 | |||
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 011011.xls
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS
January 10, 2011
| Potential capital extras | ||
|---|---|---|
| Pipe conduit Conflicts | $0 | |
| Controls | ||
| Sludge room retrofit | ||
| HVAC Thermostats | $0 | |
| Cathode Protection | $10,000 | |
| Treatment Tanks | $0 | |
| Electrician (increase in wages) | $20,000 | |
| UV Channel | $11,357 | |
| Total potential extras | $41,357 | $41,357 |
| Potential Receipts | ||
| Total Potential Receipts | $0 | $0 |
POTENTIAL EXTRAS
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 011011.xls
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS
January 10, 2011
| NO. | AMOUNT | APPROVED | WORK | STATUS | PAID |
|---|---|---|---|---|---|
| WORTH | |||||
| 1 | $3,209.70 | 2/24/09 | BLOWER #1 REPAIR | APPROVED | NO |
| 4 | $5,542.80 | 5/11/09 | BLOWER #2 REPAIR | APPROVED | NO |
| ? | $4,617.08 | ???? | BLOWER #3 REPAIR | APPROVED | NO |
| 3 | $2,703.00 | 12/14/09 | ANTI-FLOT COLLAR | APPROVED | NO |
| 5 | $6,784.65 | 12/14/09 | LARGER MIXER FOR FLOC TANK | APPROVED | NO |
| 15 | $4,494.52 | 12/14/09 | REMOVABLE RAILS ON SBR TANK | APPROVED | NO |
| 17 | $6,126.78 | 3/8/10 | BLOWER #4 REPAIR | APPROVED | NO |
| 8 | -$6,250.00 | 3/8/10 | CREDIT FOR CAST IRON PIPE | APPROVED | NO |
| -$20,000.00 | 2/8/10 | Credit for Electric Wages | APPROVED | NO | |
| 9 | -$50,000.00 | 2/8/10 | Credit for paving | APPROVED | NO |
| 19 | $27,702.20 | 5/20/10 | air drops | APPROVED | NO |
| 20 | $3,516.77 | 5/20/10 | 2 doors | APPROVED | NO |
| 21 | $18,094.59 | 5/20/10 | Paint DAVCO WALKWAYS | APPROVED | NO |
| 22 | -$13,875.00 | 5/20/10 | Credit for concrete | APPROVED | NO |
| 24 | $5,932.27 | 6/14/10 | Additional block for sludge building | APPROVED | NO |
| 23 | $6,671.26 | 11/4/10 | Centrifuge Platform | APPROVED | NO |
| 25 | $3,050.21 | 11/4/10 | Fence | APPROVED | NO |
| 12 | $4,703.27 | 11/8/10 | Steel beam in control bldg | APPROVED | NO |
| 18 | $4,499.12 | 1/11/00 | Control Joint Mod in Screen Bldg | APPROVED | NO |
| 26 | $1,409.44 | 12/13/10 | gate in fence | APPROVED | NO |
| Total | $18,932.66 | ||||
| CLINGER | |||||
| 1 | Denied | EXTEND 34 KV LINES | DENIED | ||
| 2 | $5,106.00 | 7/1/09 | CORNER UNIT FOR MCC | APPROVED | NO |
| 3 | $23,585.00 | SERVICE DISCONNECT | APPROVED | NO | |
| 4 | $3,171.00 | 4/12/10 | Applebrook Pump | APPROVED | NO |
| $1,451.24 | 3/23/10 | Cables for 2 chart recorders | APPROVED | NO | |
| Total | $33,313.24 | ||||
CHANGE ORDERS
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 011011.xls
Pennoni
January 6, 2011
EGMA0707
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: RCSTP Upgrade and Expansion
Continued Construction Services
October 15 to Project Close-Out
Dear Mr. Smith:
In October, Board approved Pennoni’s estimate for additional fees to support the RCSTP project based on an extended substantial completion date of October 15. We anticipated that the contractors would be through punchlists within approximately one month following substantial completion. To date, the contractor punchlists remain in progress, and Pennoni continues to monitor punchlist activity, coordinate progress meetings, and support troubleshooting activities. We estimate punchlist completion by the contractors on January 31. Based on this anticipated completion date, we have prepared the following estimate of our fees required to reach the January 31 date. For reference, December 15 was the date of the most recent invoice for this project.
October 15- December 15
Additional progress meetings (3 meetings at 24 hrs total) - $2,400
Construction observation (Matt McAloon only) (90 hrs total) - $6,750
Response and assistance for two electrical/power outages (23 hrs total) - $1,800
TOTAL = $10,950
December 15- January 31
1 meeting – (8 hrs total) - $800
Construction Observation (Matt McAloon) (30 hrs total) - $2,250
TOTAL = $3,050
The estimated effort to complete the above items is $14,000. This is an estimate and actual effort can vary depending on Contractor performance and other items beyond Pennoni’s control. This estimated effort will not be exceeded without prior approval from the Authority.
Should you have any questions or need additional information, please do not hesitate to call.
Sincerely,
PENNONI ASSOCIATES INC.
Daniel P. Barbato, P.E.
Authority Engineer
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 28, 2010
Jeff Bush, Project Manager
Worth & Company, Inc.
6263 Kellers Church Road
Pipersville, PA 18947
Re: Application for Payment No. 24
Dated 11/30/2010
Dear Jeff:
At their meeting on December 13, 2010 the Municipal Authority tabled action on the Worth and Company, Inc. Application for Payment No. 24. The Authority held a special meeting on December 28, 2010 to reconsider the Application and it was the consensus of the members that the payment should not be approved pending further review.
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Rick
Louis F. Smith, Jr.
Township Manager
Cc: Dan Barbato, PE
Scott Towler, PE
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\General Mechanical\Letter to Application #24 122810 2.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
January 7, 2011
To: Municipal Authority
From: Mark Miller
RE: Damage to TVSS Unit
On December 9th, 2010 Peco Energy was installing new power lines along East Boot Road when they came in contact with the existing power lines, this created a surge which caused the damage at the plant.
Mark filed a claim with Peco and we are meeting with them on Tuesday to discuss it. Attached is a cost estimate from Clinger.
F:\Data\Shared Data\Public Works Dept\Municipal Authority\memo to Municipal Authority for Peco Damage Dec. 9th to TVSS To.doc
CLINGER
Over a half-century of excellence
736 Baltimore Pike
P. O. Box 158
Concordville, Pa. 19331
Phone: 610-459-1234
Fax: 610-459-8823
December 09, 2010
East Goshen Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, Pa. 19380-6199
Attention: Mr. Louis F. Smith, Jr.
Township Manager
Reference: Ridley Creek Waste Water Treatment Project
Damages to TVSS Units
Dear Mr. Smith,
Upon arriving on site I was given the details surrounding a loss of site power and on the return of that power there were indicating lights on the TVSS units that a failure occurred on one leg of the TVSS unit that is integral to the MDP. We looked downstream of the MDP and found that panel CBH, which is fed from a breaker in panel MDP, also had a failure light on the TVSS unit that is integral to that panel as well. In each case the TVSS unit performed as it was designed by taking on the surge that resulted when plant power was repaired.
I called for my electrician foreman, Matt Burke, to come to the site to perform the inspection and review of the electrical equipment and these were the only failed components that were detected at that time. It will be required to replace both of these TVSS units so I will attach a quotation for such replacements. It should also be noted that contained within panel CBH is a surge counter that had registered 634 surges up to that point in time. As a result of our findings we are also recommending that this condition be monitored over a two week period with the intent of determining if further protection should be put in place. If you are interested please indicate and we can provide a quote for the monitoring and subsequent report of the findings.
If you should have any questions please feel free to contact me.
Sincerely yours,
Clinger Corporation
Robert F. Dina, Sr.
Robert F. Dina, Sr.
ELECTRICAL CONSTRUCTION COMMUNICATIONS CABLING COMPUTER CABLING
CLINGER
Nearly a half-century of excellence
FAX QUOTE
December 20, 2010
Name: Mr. Mark Miller
Company: East Goshen Township Autority
Fax #:
Reference: Change Order Request CEG800-008 EGWWTP
We are pleased to submit our lump sum price in the amount of Sixteen Thousand Fifty Nine Dollars ($16,059.00) to furnish and install one (1) Integral TVSS for the MDP Panel and one (1) Integral TVSS for the Panel CBH. These are exact replacements for each of these pieces of equipment as originally supplied by the factory in order to maintain all warranties and rating.
Scope of Work Adder:
- De-energize plant power and remove existing damaged TVSS unit from the MDP Panel.
- Furnish and install replacement TVSS unit in MDP Panel and re-energize power.
- Shutdown breaker that feeds Panel CBH in MDP Panel and remove damaged TVSS unit from Panel CBH.
- Furnish and install replacement TVSS unit is Panel CBH and re-energize power.
| Assessment of Damages | $1,260.00 |
|---|---|
| Labor | $3,960.00 |
| Testing | $1,200.00 |
| Materials | $9,639.00 |
| Total | $16,059.00 |
Clarifications:
- Generator will be required to run for a minimum of eight (8) hours on at least two (2) separate occasions at owner’s expense during our installations.
- All work has been priced to occur during normal straight time work hours.
- All reporting shall consist of the electrical contractor’s verification report that both units installed are working as designed and shall be covered under warranty.
- Our price has been based on the scope of work as identified above and shall only be valid until December 31, 2010.
- Delivery of the TVSS units will be 2-4 weeks from the release.
Thank you for your time and consideration.
Sincerely,
Robert F. Dina, Sr.
Brickhouse Environmental
Consultants and Engineers
6
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Invoice number: 5706
Date: 1/3/2011
Client ID: 548
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of December 2010.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 136.00 | 15,640.00 |
| Labor Total | 136.00 | 15,640.00 |
| Reimbursable | Amount |
|---|---|
| 0.00 | |
| Expense Total | 0.00 |
| Invoice Total | 15,640.00 |
1-7-2010
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com
When Creativity & Experience Count
Brickhouse Environmental
Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
December 2010
The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:
- 12-2-10 Emails regarding SBR trouble shooting to and from Paul Christiansen at Siemens Jet Tech. Visited RCSTP to gather and review data. Reset disc filter alarms. Telephone call with Dwayne from Worth & Company. Telephone call with Matt McAloon from Pennoni Associates. Telephone call to Mark Miller - progress update and request to troubleshoot SBR 1 WAS pump. Progress Meeting at Township Building.
- 12-3-10 Progress construction meeting. Site visit to RCSTP to gather data and review operations for conveyance to Paul Christiansen, Siemens, for operational control adjustments.
- 12-4-10 On site to meet with electrician from Clinger regarding flow meter signal wires to influent and effluent composite samplers.
- 12-7-10 On site to meet with To Horrex and Mark Miller to discuss operational changes from 4 BR basins to 3 SBR basins.
- 12-8-10 On site at RCST to monitor progress of the treatment process and gather information to be shared with Siemens. Observations of effluent conditions of solids passing, filters containing heavy scum, 3 SBRs operating in over aeration conditions. Telephone with Jeff Bush. Email correspondence with Bob Dina.
- 12-9-10 On site to accompany Siemens Representative, Carl Jansen, to address operational issues with the alum feed pumps, blowers, and Siemens HIM and controls. Prepare Project Managers Monthly Report.
- 12-10-10 On site to monitor operational changes and follow up with corrective action from previous day.
- 12-13-10 On site at RCSTP. Finalized monthly PM report for November. Attended month EGTMA meeting and present Project Managers Report
- 12-14-10 On site at RCSTP. Follow up on corrective actions as requested by Siemens. Met with mark Miller. Met with Kevin Jacokby (CET). Email and update plant data. Correspondence with Siemens.
- 12-15-10 On site to meet with GE technician. Attend progress meeting.
Brickhouse Environmental
Coordinate equipment shutdown and operation of blower vfd 3 and 4. Provide technical assistance for plant operation.
- 12-16-10 4.75 hours carryover from December 16, 2010 On site at RCSTP - technical assistance with plant operation. Site meeting for GE blower evaluation. Bob Dina on site. Progress Meeting at Township Building. Centrifuge testing scheduled for 1-3-11
- 12-17-10 On site to provide technical support and process evaluation.
- 12-18-10 On site to provide technical support and process evaluation.
- 12-19-10 On site to provide technical support and process evaluation.
- 12-20-10 On site to meet with Aqua Aerobic representative regarding disc filter # 1 number 2 back wash valve.
- 12-21-10 On site to provide process technical assistance and troubleshooting. SBR #4 was pumped into SHT #1 which was filled and flowed into influent wet well creating a solids and hydraulic overload to the WWTP. Accompany Miller Environmental on a plant tour in preparation of assuming operation and maintenance responsibilities.
- 12-22-10 On site to meet with representative from Aqua Aerobics to replace the number 2 backwash valve for disc filter number. On site to provide process technical support.
- 12-23-10 Trouble shooting plant performance issues.
- 12-27-10 On site to provide technical support and process evaluation. Coordinate scheduling and review plant data.
- 12-28-10 On site to provide technical support and process evaluation. Provide technical support and assistance to Miller Environmental towards transition of O&M responsibilities
- 12-29-10 On site to provide technical support and process evaluation. Provide technical support and assistance to Miller Environmental towards transition of O&M responsibilities
- 12-30-10 On site to provide technical support and process evaluation. Provide technical support and assistance to Miller Environmental towards transition of O&M responsibilities. SBR sampling and performance
- 12-31-10 On site to provide technical support and process evaluation.
Brickhouse Environmental
Notes:
- Brickhouse’s project management involvement was originally anticipated to be completed week 67, ending August 8, 2010 at 1,522 hours.
- Brickhouse’s involvement was extended, without need to increase the total contract hours or value to due to Brickhouse being under the original budget. This extension was to week 76, ending October 10, 2010 and attendance at the October 11, 2010 Monthly Authority Meeting. At that time the original budget hours were met.
- At the Authority’s November 8, 2010 meeting, Brickhouse’s involvement was subsequently extended on a T & M basis until released by the Authority from any further needs.
J:\092532.0\December 2010 Bullets.doc
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
Brickhouse’s contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours and $175,030.
From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.
The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting which then expended the original 1,522 hours.
The Board subsequently approved Brickhouse Environmental to continue to serve the Authority’s needs as requested on a T&M basis.
Monthly Project Management Subtotals Beyond the Original Budget
| Month | Project Subtotals | |||
|---|---|---|---|---|
| Pro. Mgt. Hours | Cumulative Hours | Cumulative Fees | Monthly Fees | |
| October 2010 | 36.25 | 36.25 | $4,168.75 | $4,168.75 |
| November 2010 | 86.50 | 122.75 | $14,116.25 | $9,947.50 |
| December 2010 | 136.00 | 258.75 | $29,756.25 | $15,640.00 |
Project Cumulating Totals
| Project Management Hours | Fee |
|---|---|
| 1,780.75 | $204,786.25 |
J:\092532.0\Project Management\PM Schedule\Extended Schedule.xls
Page 1 of 1
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 459101
Invoice Date: 12/22/2010
Project: EGMA0707
Project Name: RCSTP Expansion
For Services Rendered through: 12/12/2010
Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss punchlists with contractors, troubleshooting and operations review, and electrical power investigations.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| 01 -- Permit Design | est. | $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. | $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. | $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. | $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. | $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. | $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. | $192,320.00 | $187,648.32 | $196,370.67 | $8,722.35 | |
| Total : | $715,320.00 | $710,514.12 | $719,236.47 | $8,722.35 |
Amount Due This Invoice: $8,722.35
[Handwritten: ok RS]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls
Invoice Date 12-22-2010
| Project: | RCSTP Expansion and Upgrade | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA0707 | ||
| Invoice No: | 457258 | ||
| Invoice Period: | 11/8/2010 | to | 12/12/2010 |
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Changes: | $ 11,500.00 | Date: | 6/14/2010 |
| Changes: | $ 40,400.00 | Date: | 8/5/2010 |
| Changes: | $ 18,720.00 | Date: | 10/11/2010 |
| Contract Amount: | $ 715,320.00 | ||
| Previously Invoiced: | $ 710,514.12 | ||
| Current Invoice: | $ 8,722.35 | ||
| Invoiced to Date ($): | $ 719,236.47 | ||
| Invoiced to Date (%): | 101% | ||
| Remaining Budget ($): | $ (3,916.47) | ||
| Remaining Budget (%): | -0.55% |
Budget by Phase:
| Phase No. | 10 |
|---|---|
| Phase Name: | Continued Eng Svcs |
| Phase Budget: | $ 99,700.00 |
| Changes: | $ 33,500.00 |
| Changes: | $ 40,400.00 |
| Changes: | $ 18,720.00 |
| Contract Amount: | $ 192,320.00 |
| Previously Invoiced: | $ 187,648.32 |
| Current Invoice: | $ 8,722.35 |
| Invoiced to Date ($): | $ 196,370.67 |
| Invoiced to Date (%): | 102% |
| Remaining Budget ($): | $ (4,050.67) |
| Remaining Budget (%): | -4% |
Comments: Phase 10 - Continued Engineering Services
Construction and coordination meetings with contractors and Township;
O&M submittal review; punchlist progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss punchlists with contractors, troubleshooting and operations review, and electrical power investigations.
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 211.25 | 7.25 | 218.50 |
| Senior Engineer | 397.75 | 23.50 | 421.25 |
| Senior Designer | 200.00 | 20.00 | 220.00 |
| Project Engineer | 164.50 | 0.00 | 164.50 |
| Staff Engineer | 13.50 | 0.00 | 13.50 |
| Associate Engineer | 73.00 | 4.50 | 77.50 |
| Graduate Engineer | 43.75 | 0.00 | 43.75 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 1052.25 | 42.00 | 1094.25 |
| Engineering Technician I | 52.50 | 4.75 | 57.25 |
| Administrative Assistant I | 1.50 | 0.00 | 1.50 |
| Totals | 2212.50 | 102.00 | 2314.50 |
[Handwritten: Draft]
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
December 13, 2010
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday December 13, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Jack Yahraes, Fran Beck, Dana Pizarro, Mike Steinberger and Joseph McCawley. Also in attendance were: Rick Smith, Township Manager; Scott Towler from Brickhouse Environmental; Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; and Kevin Cummings.
COMMON ACRONYMS:
| MA – Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lochwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental Protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
2. RCSTP REPORTS
A. Brickhouse Report
Scott reported that significant progress towards the electrical and general/mechanical punch list items was completed during November. Both contractors have worked towards resolving the issues to achieve final project completion and are approximately 95% completed. The punch list work completion date has slipped to on or before December 31, 2010. Remaining items on the electrical punch list include the short circuit protection and coordination and arc flash studies. Remaining items on the general/mechanical punch list includes labels for non-potable water hydrants, replacing two hour meters, instrument panel lamp and adjustment knob for a dissolved oxygen probe mounting bracket.
The SBR treatment process was observed to have achieved the proposed current new effluent discharge limitations during the weeks of November 1st and 8th. The nitrate concentration was observed to have risen from approximately 3 mg/L to 18 mg/L during the week of November 15th. The fourth SBR tank was placed in service on November 19th in preparation of conducting the Siemens Jet tech SBR performance/warranty test. The treatment process continued to deteriorate and the solids concentration in the SBR effluent increased. Technical support and guidance fro Siemens Technical Staff was initated during the week of November 22nd and is ongoing. During a trial test of the alum feed system, an issue with the pump controls appeared to have resulted in significantly overdosing the SBR tanks with alum. Approximately 800 gallons was added to treatment process during a 24-hour period. The control issue between the pumps and control panel was corrected on December 9th by representatives for Siemens.
MA Minutes 12/13/2010 1
The Siemens warranty performance testing of the treatment system has been postponed until January 2011 to adjust the treatment process. The centrifuge dewatering system performance testing is scheduled for January 3, 2011. Informal conversations with the facility inspector from PADEP have included on implementing the new NPDES final effluent discharge requirements during the first quarter 2011 (February/March timeframe). Prior to implementing the new discharge permit limitations, representatives from PADEP will be invited to visit the facility, review operations and provide official notification of the start date for the new effluent discharge permit limitations.
In November the VFD circuit breaker tripped. The GE service tech was investigating and it was determined that there is a loose wire in the VFD which shorted causing the failure. It was suggested that the other 3 VFD's be checked.
B. Pennoni – Dan Barbato, reported the following:
RCSTP Upgrade and Expansion
- Construction phase services have transitioned to punch list monitoring, final review of operations and maintenance submittals, and startup assistance and troubleshooting, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Birckhouse and the Township, and approval of contractor Payment Requests.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth & Company and Clinger Corporation are working on punch list completion and outstanding items are expected to be complete this month.
- Pennoni has completed review of the Operations and Maintenance submittals for Worth and Clinger and has provided comments back to both contractors.
- Pennoni will support plant performance testing activities as needed.
- Pennoni Design Engineer Tim Daily visited the plant to review the installation and operation compared to the intent of his design. A report was submitted to the Authority with details and recommendations.
I Metering Project
- The Township continues to meter flows at selected locations. Meters are in the process of being located to the proposed new locations, and we will review all meter data as it is submitted.
Ridley Creek Consent Order
- The next report is due to DEP in March of 2011. No comments were received to date on the September report submitted to DEP..
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- These documents were provided to the Township for submittal to DEP. The Township received comments from DEP and we are in the process of addressing. We have requested an extension from DEP to complete the response to their comments by the end of February. Several of the DEP comments require that West Goshen adopt resolutions. The extension will allow for time to prepare and submit the resolutions for adoption.
MA Minutes 12/13/2010 2
Marydell PS Elimination Planning
- The draft report sections for the Act 537 Plan Revision are being assembled. We anticipate completing the reports in late December or early January. Several notification forms are being completed at this time
Applebrook Comprehensive Groundwater Evaluation
- Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The report is drafted and will be ready for Township review before the Holiday. No significant issues were identified as a result of the evaluation.
West Pikeland Township Sewer Capactiy Request
- On August 5, 2010, West Pikeland Township requested East Goshen/DARA to consider accepting 20,000 gallons per day of sewage from West Whiteland to facilitate West Pikeland's cpacity needs. Our recommendation in response to the request is provided under separate cover. Mike moved to deny the West Pikeland request. Joe seconded the motion. The motion passed unanimously. Rick will write a letter.
The letter received from Dan outlining the proposed fee schedule for 2011 and Annual Services was reviewed. Joe moved to retain Pennoni at the new proposed rates. Fran seconded the motion. The motion passed unanimously.
C. Cost Summary – The Cost Summary was reviewed. Rick feels the cost should be closed to $9.9 million.
D. Change Orders – Fran moved to approve Mark Miller's request for $1,250.00 to complete the landscaping between the SBR tanks and the homes backing up to the plant. Joe seconded the motion. The motion passed unanimously.
Worth & Co., PCO-26, dated November 30, 2010, to add one additional 12' gate in the new fence, $1,409.44. Mike moved to approve payment. Dana seconded the motion. The motion passed unanimously.
3. RCSTP INVOICES
A. Joe moved to approve payment for the following invoices. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
- Fastenal, #PAMAV4919, 11/18/10 — $ 2,474.04
- Highway Materials, #1622530MB, 11/5/10 — $ 1,828.36
- Highway materials, #11025998MB, 11/05/10 — $ 1,841.53
- Highway Materials, #11026142MB, 10/18/10 — $ 260.42
- Highway Materials, #11026121MB, 11/17/10 — $ 1,147.06
- Brickhouse Environmental, #5683, 12/01/10 — $ 9,947.50
- Pennoni, #457258, 11/23/10 — $ 4,097.75
- Gawthrop, Greenwood, PC, #84386, 11/30/10 — $ 171.00
- Gawthrop Greenwood, PC, #84387, 11/30/10 — $ 720.00
- Gawthrop Greenwood, PC, #84078, 10/31/10 — $ 720.00
- Independence Const. #30-00010257, 11/05/10 — $ 3,136.40
MA Minutes 12/13/2010 3
- Independence Const. #30-00010259, 11/05/10 — $ 4,202.99
- Power pro Equip., #P32515, 10/27/10 — $ 17.50
- Silvi Concrete, #2122141, 10/21/10 (already paid in Oct, need approval) — $ 1,552.80
- Reilly & Sons Inc., #000531, 11/02/10 — $ 1,125.21
The following 4 invoices were either already approved for payment last month or do not belong to the Municipal Authority:
- Ransome Rental, #K0308701, 10/25/10 — $ 1,984.00
- Martin Limestone, #302737, 10/18/10 — $ 296.35
- Martin Limestone, #302735, 11/1/10 — $ 299.83
- Martin Limestone, #303385, 10/25/10 — $ 593.57
Approval of Worth & Company Inc. Invoice #P28001, 11/30/10 for $125,000.00 was tabled.
4. CHAIRMAN'S REPORT
- Jack announced that Mike has resigned from the Municipal Authority. He expressed thanks to Mike for his service to the Authority. He introduced Kevin Cummings who will replace Mike as of January 1, 2011.
- Jack reminded everyone that next month they need to reorganize and vote new officers. He suggested Joe for Chairman, Dana for Vice Chairman, Fran for Secretary, Jack for Treasurer and Kevin for Assistant Secretary/Treasurer.
- Jack announced that the ABC Annual Planning Meeting will be held on Saturday, January 8, 2011 starting at 7:45 am. The Municipal Authority is scheduled to give a report at 8:45 am. Jack will do the presentation.
- Jack announced that Joe was reappointed to the Authority for a 5-year term for the Board of Supervisors.
- Jack asked Rick to have any mail dated before the meeting put in the Municipal Authority mailbox and he will pick it up.
5. APPROVAL OF MINUTES
A. Joe moved to approve the minutes of the November 8, 2010 as corrected. Fran seconded the motion. The motion passed unanimously.
6. ENGINEER'S REPORT – See 2B.
7. APPROVAL OF INVOICES
A. Gawthrop Greenwood, 84385, 11/30/10, $380.00. Joe moved to approve payment. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
B. Pennoni, #457260, 11/23/10, $1,785.00. Mike moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
C. Pennoni, #457259, 11/23/10, $105.00. Joe moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
MA Minutes 12/13/2010 4
8. LIAISON REPORTS
A. Jack reported for the Historical Commission. New officers for 2011 are: Ellen, Chairman, and Ben and Chris, Vice Chairmen. The Living History Day will be June 4, 2011. A statewide Civil War reenactment will be held in July 2011. Oct. 1, 2011 is Chester County Day and will feature the East Goshen quadrant.
B. Jack reported for the Board of Supervisors. Carmen has requested to be named the liasion for the Municipal Authority for 2011. He thanked everyone for coming to the Holiday Party.
9. FINANCIAL REPORTS
None
10. GOALS
Dana did provide an article by Nov. 11, 2010 for the next Township newsletter.
Jack attended the West Goshen meeting.
11. OLD BUSINESS
None
12. NEW BUSINESS
None
13. CAPACITY REQUESTS
None
14. SEWER REPORTS
A. Mark Miller reported the following:
Meters – The meters were calibrated for the last quarter. The Public Works employees read the meters on a daily basis.
CC Collection – There were 3 lateral clogs. Two were caused by children throwing debris down the clean-out pipe.
All the pumping stations wet wells were cleaned. New floats were installed at the Ashbridge Pump station. Also, there was a problem with the transducer.
RC Collection – The pumping station was visited on a daily basis no problems to report.
Lochwood Plant – The plant was visited on a routine basis. Several trees fell in the spray fields. They are scheduled for removal this month.
Ridley Creek Plant – Was visited on a daily basis. Routine maintenance was done to the screen. A new strainer was ordered for the utility water line. The floors in the SBR Building were scrubbed and sealed.
Pa One Calls – 89 PA One Calls were received for the month of November.
Alarms – 27 alarms for the month of November.
MA Minutes 12/13/2010 5
The new management of operation of the plant will be done by Miller Environmental.
15. ANY OTHER MATTER
None
16. CORRESPONDENCE
None
17. PUBLIC COMMENT
None
18. ADJOURNMENT
There being no further business, Mike moved to adjourn the meeting. Joe seconded the motion. The meeting was adjourned at 8:30 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 12-13-10 Draft.doc
MA Minutes 12/13/2010 6
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
SPECIAL MEETING MINUTES
December 28, 2010
The East Goshen Township Municipal Authority held a special meeting on Tuesday December 28, 2010 at 8:00 a.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Joseph McCawley and Dana Pizarro. Also in attendance were: Rick Smith, Township Manager; Mark Miller, Director of Public Works and Authority Solicitor, Steve McDonnell.
COMMON ACRONYMS:
| MA- Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lochwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental Protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 8:06 a.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
2. EXECUTIVE SESSION
The members went into an executive session to discuss a pending legal matter. The executive session ended at 8:26 a.m.
3. NEW BUSINESS
Worth and Company Application of Payment No. 24, 11/30/2010, $125,000. It was the consensus of the members that the payment should not be approved pending further investigation of the various claims for delay.
4. PUBLIC COMMENT
None
5. ADJOURNMENT
There being no further business, Joe moved to adjourn the meeting. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The meeting was adjourned at 8:28 a.m.
Respectfully submitted,
Louis F. Smith, Jr., Township Manager
F:\Data\Shared Data\Minutes\Municipal Authority\2010\MA 12-28-10 SPECIAL MTG Draft.doc
MA Minutes 12/28/2010 1
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 459104
Invoice Date: 12/22/2010
Project: EGMA1000
Project Name: 2010 Annual Services
For Services Rendered through: 12/12/2010
Preparation of monthly report, monthly Authority meeting. Prepare response to W. Pikeland Twp. request for capacity.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 866.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 866.25 |
Amount Due This Invoice: $866.25
| Fee : | 13,338.25 |
|---|---|
| Prior Billings : | 11,047.00 |
| Current Billings : | 866.25 |
| Total Billings : | 11,913.25 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 8.25 | 105.00 | 866.25 |
| Labor Total: | 8.25 | 866.25 |
| Total Phase : **** -- Professional Services | Labor : | $866.25 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1000 -- 2010 Annual Services | Labor : | $866.25 |
| Expense : | $0.00 |
[Handwritten: ok RS]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1000 Invoice Summary.xls
Invoice Date 11-23-2010
| Project: | 2010 Annual Services | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA 1000 | |||
| Invoice No: | 459104 | |||
| Invoice Period: | 11/18/2010 | to | 12/12/2010 | |
| Initial Authorization: | $ 10,338.25 | Date: | 1/11/2010 | |
| Changes: | $ 3,000.00 | Date: | ||
| Contract Amount: | $ 13,338.25 | |||
| Previously Invoiced: | $ 11,047.00 | |||
| Current Invoice: | $ 866.25 | |||
| Invoiced to Date ($): | $ 11,913.25 | |||
| Invoiced to Date (%): | 89% | |||
| Remaining Budget ($): | $ 1,425.00 | |||
| Remaining Budget (%): | 11% | |||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2010 Annual Services |
| Phase Budget: | $ 13,338.25 |
| Previously Invoiced: | $ 11,047.00 |
| Current Invoice: | $ 866.25 |
| Invoiced to Date ($): | $ 11,913.25 |
| Invoiced to Date (%): | 89% |
| Remaining Budget ($): | $ 1,425.00 |
| Remaining Budget (%): | 11% |
Comments: Preparation of monthly report, monthly Authority meeting. Prepare response to W. Pikeland Twp. request for capacity
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 459105
Invoice Date: 12/22/2010
Project: EGMA1002
Project Name: Applebrook Comp. Groundwater Eval.
For Services Rendered through: 12/12/2010
Prepare draft report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,970.97 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,970.97 |
Amount Due This Invoice: $1,970.97
| Fee : | 5,500.00 |
|---|---|
| Prior Billings : | 3,333.75 |
| Current Billings : | 1,970.97 |
| Total Billings : | 5,304.72 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 105.00 | 78.75 |
| Associate Engineer | 1.75 | 80.00 | 140.00 |
| Labor Total: | 2.50 | 218.75 |
Multiplier Labor
| Class | Hours | Cost | Multiplier | Amount |
|---|---|---|---|---|
| Senior Geologist | 16.00 | 40.56 | 2.7000 | 1,752.22 |
| Multiplier Labor Total: | 16.00 | 1,752.22 |
| Total Phase : **** -- Professional Services | Labor : | $1,970.97 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1002 -- Applebrook Comp. Groundwater Eval. | Labor : | $1,970.97 |
| Expense : | $0.00 |
[Handwritten: ok RS]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1002 Invoice Summary.xlsx
Invoice Date 12-22-2010
| Project: | Applebrook Comp. Groundwater Eval. | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA 1002 | |||
| Invoice No: | 459105 | |||
| Invoice Period: | 11/8/2010 | to | 12/12/2010 | |
| Initial Authorization: | $ 5,500.00 | Date: | 9/20/2010 | |
| Changes: | $ - | Date: | ||
| Contract Amount: | $ 5,500.00 | |||
| Previously Invoiced: | $ 3,333.75 | |||
| Current Invoice: | $ 1,970.97 | |||
| Invoiced to Date ($): | $ 5,304.72 | |||
| Invoiced to Date (%): | 96% | |||
| Remaining Budget ($): | $ 195.28 | |||
| Remaining Budget (%): | 4% | |||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Applebrook Comp. |
| Phase Budget: | $ 5,500.00 |
| Previously Invoiced: | $ 3,333.75 |
| Current Invoice: | $ 1,970.97 |
| Invoiced to Date ($): | $ 5,304.72 |
| Invoiced to Date (%): | 96% |
| Remaining Budget ($): | $ 195.28 |
| Remaining Budget (%): | 4% |
Comments: Prepare draft report.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 459099
Invoice Date: 12/22/2010
Project: EGMA0703
Project Name: LCSTP Decommissioning Planning
For Services Rendered through: 12/12/2010
Correspondence with DEP, assemble draft comment responses.
Phase : 02 -- Act 537 Plan Update
| Total Phase : 02 -- Act 537 Plan Update | Labor : | 795.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 795.00 |
Amount Due This Invoice: $795.00
| Fee : | 29,700.00 |
|---|---|
| Prior Billings : | 26,138.50 |
| Current Billings : | 795.00 |
| Total Billings : | 26,933.50 |
Phase : 02 -- Act 537 Plan Update
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 105.00 | 52.50 |
| Project Engineer | 8.25 | 90.00 | 742.50 |
| Labor Total: | 8.75 | 795.00 |
| Total Phase : 02 -- Act 537 Plan Update | Labor : | $795.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA0703 -- LCSTP Decommissioning Planning | Labor : | $795.00 |
| Expense : | $0.00 |
[Handwritten: ok RS]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0703 Invoice Summary.xls
Invoice Date 12-22-2010
| Project: | LCSTP Decommissioning Planning | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA0703 | |||
| Invoice No: | 459099 | |||
| Invoice Period: | 11/8/2010 | to | 12/12/2010 | |
| Initial Authorization: | $ 23,700.00 | Date: | 5/14/2007 | |
| Changes: | $ 6,000.00 | Date: | 12/14/2009 | |
| Contract Amount: | $ 29,700.00 | |||
| Previously Invoiced: | $ 26,138.50 | |||
| Current Invoice: | $ 795.00 | |||
| Invoiced to Date ($): | $ 26,933.50 | |||
| Invoiced to Date (%): | 91% | |||
| Remaining Budget ($): | $ 2,766.50 | |||
| Remaining Budget (%): | 9% | |||
Budget by Phase:
| Phase No. | 01 | 02 | 10 |
|---|---|---|---|
| Phase Name: | DEP Coordination | Act 537 Plan Update | Survey of Diversion Sewer |
| Phase Budget: | $ 3,700.00 | $ 20,000.00 | $ 6,000.00 |
| Previously Invoiced: | $ 2,610.00 | $ 17,528.50 | $ 5,735.00 |
| Current Invoice: | $ - | $ 795.00 | $ 265.00 |
| Invoiced to Date ($): | $ 2,610.00 | $ 18,323.50 | $ 6,000.00 |
| Invoiced to Date (%): | 71% | 92% | 100% |
| Remaining Budget ($): | $ 1,090.00 | $ 1,676.50 | $ - |
| Remaining Budget (%): | 29% | 8% | 0% |
Comments: Correspondence with DEP, assemble draft comment responses.
2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
2010 FINAL REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - Completed; Need by 8/11/10 Joe – Mark - Completed; Need by 11/10/10 Dana - Completed
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana – Not Completed; 3 rd Quarter (September) Joe - Completed - Attended the August meeting; 4 th Quarter (December) Jack - Completed
- Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10). West Pike Township request received on August 6, 2010, MA directed staff to look into on August 9, 2010 - Engineer’s response 12/9/10
- Implement I&I Plan. – Completed and Ongoing – March Report filed on time, September Report filed in time, I&I repair work continues.
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction. Substantial Completion October 21, 2010
- Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. Completed - SBR Tour conducted on 3/15/10
- Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. Completed - SBR Class conducted on 3/15/10
- Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. BoS adopted Resolution 10-106 on 6/15/2010. Revisions sent to PA DEP on 6/16/10. Received DEP 7/13/10 review letter. Currently working on response.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\Final.doc
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. BoS adopted resolutions 10-105 and 10-108 on 6/15/10. Revisions sent to PA DEP on 6/16/10. Received DEP 7/14/10 review letter. Currently working on response.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
- Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Obtained agreement on diversion from West Goshen on 5/13/10.
FUNDING
- H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. Completed - We have received the money. Used grant money to pay Worth and Clinger August invoices
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\Final.doc
FILE COPY
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: October 5, 2010
To: Municipal Authority
From: Rick Smith, Township Manager
Re: Comp Plan Goals
Jack and I met on October 5 to review the Authority's Comp Plan Goals and our findings are as follows:
Item 17B-4 Evaluate the need to provide sewer service across Township Boundaries
Action - Consider the cost effectiveness of extending services to areas outside the Township
Priority - High
Timeframe - Ongoing
Status- Active
The Authority has considered several requests from property owners in Willistown to provide sewer service via our sewer line in Line Road. The majority of these requests have been approved. We recently approved capacity, with conditions for five homes for Michael Mirarchi. All of these requests were granted at no cost to the Authority. We are currently reviewing a request from West Pikeland Township for 20,000 GPD.
We are not aware of any projects or vacant ground in West Goshen, Westtown, East Whiteland or West Whiteland that would need sewer capacity from us. There may be additional opportunities with Willistown. However, we would suggest that the Authority continue with it current policy of reacting to requests.
Suggest status be changed to - Completed and Ongoing
Item 27B-5 Provide for upgrading of existing public sewer lines and wastewater treatment facilities
Action – Evaluate the existing sewer lines and connections to ensure the system is free of infiltration and other problems
Priority - High
Timeframe – Ongoing
Status - Active
We are finishing up the RCSTP Expansion and Upgrade Project, in the planning stages of projects to abandon Lockwood STP, eliminate the Marydell and Reserve Pump Stations, and
F:\Data\Shared Data\Admin Dept\Comp Plan\Nunicipal Authority\Status 100510.doc
redirect the Hershey Mill Pump Station. We also have a very aggressive I&I Program. We recently slip lined sewer lines in Waterview and lined manholes in Waterview and Bittersweet.
Suggest status be changed to - Completed and Ongoing
Item 37B-3 Evaluate the Township Act 537 Plan and update as need to address areas lacking service in the Township
Action - Review the Township Act 537 Plan bi-annually or as often as necessary
Priority - Medium
Timeframe - Ongoing
Status – Completed and ongoing
In 2007 we looked extensively into the possibility of providing sewer service to Charter Chase & Brookmont. The conclusion was that since the soils in both neighborhoods where generally suitable and the cost per connection was prohibitive that the Township would not proceed with installing public sewer. Both of these neighborhoods consist of one acre lots situated in a relatively compact area. Goshen Downs is another neighborhood of one acre lots, with on-lot sewer systems and we have taken a cursory look at it as well and concluded that the cost per connection would be prohibitive as well. These three neighborhoods comprise almost half of the homes with on-lot systems, with the remaining on-lot systems fragmented for the most part in the northern part of the Township. Accordingly, if the cost per connection for Charter Chase and Brookmont are prohibitive, the cost per connection for the remaining lots would be even higher.
We also completed the Wastewater Needs Analysis in 2007. As part of this Analysis we indentified the vacant properties that would need sewer capacity and incorporated them into the Analysis. The Analysis was submitted to PA DEP and will be used as the basis for future updates to the Act 537 Plan.
Status of - Completed and Ongoing – is appropriate
Item 47B-5 Provide for upgrading of existing public sewer lines and wastewater treatment facilities
Action – Evaluate new technologies and existing equipment needs
Priority - Medium
Timeframe - Ongoing
When initially looked into the MBR process for the RCSTP project, but abandoned it due to the high cost. We finally settled on the SBR process, which while not a “new” technology is definitely a proven method of sewer treatment. We also used heat cured slip lining to rehabilitate sewer lines in Waterview and used a similar process to reline manholes in Waterview and Bittersweet.
We have recently studied the Marydell Pump Station and concluded that is was cost effective to eliminate it as opposed to replacing it. We are currently in the Act 537 planning process.
Status of - Completed and Ongoing – is appropriate
F:\Data\Shared Data\Admin Dept\Comp Plan\Nunicipal Authority\Status 100510.doc
Item 57B-3 Evaluate the Township Act 537 Plan and update as need to address areas lacking service in the Township
Action -- Review the Township Act 537 Plan to ensure consistency with the Comprehensive Plan
Priority - High
Timeframe - Intermediate
We looked extensively into the possibility of providing sewer service to Charter Chase & Brookmont in 2007. The conclusion was that since the soils in both neighborhoods where generally suitable and they cost per connection was very high that the Township would not proceed with installing public sewer.
We also completed the Wastewater Needs Analysis in 2007. As part of this Analysis we indentified the vacant properties that would need sewer capacity and incorporated them into the Analysis. The Analysis was submitted to PA DEP and will be used as the basis for future updates to the Act 537 Plan.
Suggest status be changed to - Completed and Ongoing
Item 67B-3 Evaluate the Township Act 537 Plan and update as need to address areas lacking service in the Township
Action – Based on the review the Act 537 Plan implement recommendations and updates as necessary
Priority - Immediate
Timeframe - Medium
We looked extensively into the possibility of providing sewer service to Charter Chase & Brookmont in 2007. The conclusion was that since the soils in both neighborhoods where generally suitable and they cost per connection was very high that the Township would not proceed with installing public sewer. Both of these neighborhoods consist of one acre lots situated in a relatively compact area. Goshen Downs is another neighborhood of one acre lots that have on-lot sewer systems. These three neighborhoods comprise almost half of the homes with on-lot systems, with the remaining on-lot systems fragmented for the most part in the northern part of the Township. Accordingly, if the cost per connection for Charter Chase and Brookmont are high, the cost per connection for the remaining lots would be higher.
We also completed the Wastewater Needs Analysis in 2007. As part of this Analysis we indentified the vacant properties that would need sewer capacity and incorporated them into the Analysis. The Analysis was submitted to PA DEP and will be used as the basis for future updates to the Act 537 Plan.
Status of - Completed and Ongoing – is appropriate
F:\Data\Shared Data\Admin Dept\Comp Plan\Nunicipal Authority\Status 100510.doc
2011
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
JANUARY REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/9/11; Need by 5/11/11; Need by 8/10/11; Need by 11/9/11
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March); 2 nd Quarter (June); 3 rd Quarter (September); 4 th Quarter (December)
- Respond to capacity requests in 45 days or less.
- Implement I & I Plan
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction.
- Invite Board of Supervisors and all other ABC members to tour the plant.
- Open House at the RCSTP
- Have Siemens conduct a training session for Miller and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project.
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2011\011011.doc
Rick Smith
From: Jyahraes@aol.com
Sent: Monday, December 20, 2010 9:11 AM
To: rsmith@eastgoshen.org
Cc: ssmith@eastgoshen.org
Subject: MA Goal Sheets for January
Rick –
Here are the MA Newsletter Assignments. Please add these to our “goals sheet” that will be included in the January Packets.
This is the schedule for 2011 along with the “due dates”:
| February 9 | Jack |
|---|---|
| May 11 | Fran |
| August 10 | Joe |
| November 9 | Dana |
| February 2012 | Kevin |
Thanks.
Jack
1
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 12/30/2010
To: All ABC Chairmen
From: Mark Gordon, Township Zoning Officer [signature: MLG]
Re: ABC Email Protocol
Dear ABC Chairmen:
The Township has launched a new email system which employs a variety of additional functionalities. The main purpose for the upgrade is to satisfy the State Statute requirements brought about by the “Open Records” and “Right to Know” Legislation. The new system will allow the staff to search the email archives for emails pertaining to a specific topic should a public “Right to Know Request” be received.
One additional function is that all ABC Chair’s will be receiving an East Goshen email address linking you to the new Township Email (webmail) system Inbox. Just ABC Chairs will be getting a Township webmail Inbox. This Inbox shall be used for all of your ABC business. I have outlined the protocol for its use below; please review this with all of your members and forward any questions to me through your Staff Liaison.
We are in the process of setting up all the mailboxes at this time and you will be notified at your current email address with instructions and a password when the email address is ready.
Protocol:
- All outbound emails from ABC Chairs relating to Township business, or any matter before the ABC, shall be communicated using the new East Goshen webmail address.
- All email correspondence between individual ABC members using personal email accounts relating to Township business, or any matter before the ABC, shall CC the ABC Chair’s East Goshen webmail address.
- When Replying Township Business Emails be sure to always “Reply to All”, this will insure that the complete string of emails is archived in the system.
- ABC Chair webmail addresses will be available on the appropriate ABC page of the Township website linked to their name. The standard format for webmail
F:\Data\Shared Data\Information Systems\E MAIL\Memo to ABC's 12302010.doc
addresses will be the first letter of the first name and the full last name @eastgoshen like mgordon@eastgoshen.org.
I have attached copy of the resolution for your information and use.
Once you have established the 2011 Chairmen for your respective ABC, please forward me their name so we can get all the email addresses created.
F:\Data\Shared Data\Information Systems\E MAIL\Memo to ABC's 12302010.doc
FILE
Rick Smith
From: Rick Smith [rsmith@eastgoshen.org]
Sent: Tuesday, December 21, 2010 7:14 AM
To: 'George Martynick'; 'metrica@aol.com'
Cc: 'mgordon@eastgoshen.org'; 'galthouse@eastgoshen.org'; 'bdenenstein@bdcomputersolutions.com'
Subject: ABC Chairmen
Attachments: 10-43 E-Mail Policy with Archiving 112310.doc
Good Morning
As you may be aware the “Right to Know Law” and e-mail has opened up a new set a challenges for the Township.
The short story is the e-mails sent to and from public officials, such as a member of the Board of Supervisors, Planning Commission member or a member of the Historical Commission are considered public records. As such people have the right to view them. This is true even if you as an ABC member send the e-mail from your personal computer.
While a blanket request to view all of your Township e-mails would not be permitted, a request to view e-mails concerning the “Jones Project” would. This hich means that there needs to be a system to search for specific e-mails.
In order to comply with this new law the Township has implemented a system where all of the township e-mails are achieved on our e-mail provider's server. Under the new system the archived e-mails can be searched. In addition the will eliminate the need for you and other ABC members to sort thru you e-mails to satisfy Right to Know requests.
There is a monthly service charge for the archiving service and in order to minimize costs the Board had decided that only the Chairman of each ABC should have an eastgoshen.org e-mail account. This will be listed on the Township web page.
The Township's IT consultant will set up a web mail site for you. Essentially you go to the web site, log in and you can then send or receive e-mail related to Township business.
Your Township e=mail address will be your first initial followed by your last name.
Ellen Carmody ecarmody@eastgoshen.org
George Martynick gmartynick@eastgoshen.org
The Township has adopted a policy on e-mails. (Attached) Please review section 6 on the last page.
I have copied Burt Denenstein, our IT consultant, on this e-mail. Burt will set up your account and e-mail you your password and instructions.
I have also copied your staff liaison and they will review the new policy and archive system at your next meeting.
Happy Holidays.
Rick Smith
1
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. 10-43
A RESOLUTION GOVERNING E-MAIL COMMUNICATIONS BY AND AMONG SUPERVISORS, STAFF AND OTHER TOWNSHIP AUTHORITIES, BOARDS AND COMMISSIONS AND ADVISORY GROUPS
WHEREAS, the Pennsylvania Sunshine Act, 65 Pa. C.S.A. §701 et. seq., as amended (the “Act”), requires that all Township business be conducted only within the context of a public meeting, excluding those matters which fall within the exceptions to the open meeting requirement under §707, §708 and §712 of the Act; and
WHEREAS, today’s communication technology such as e-mail is a valuable tool and allows for the near real-time communication of information to multiple recipients; and
WHEREAS, care must be taken that the Board of Supervisors (the “Board”), Township Staff, the members of other Township Authorities, Boards and Commissions (the “ABCs”) and/or any other Advisory Group(s) appointed by the Board (the “Advisory Groups) do not violate the Act by conducting deliberations outside of an open meeting via e-mail; and
WHEREAS, e-mails typically occur at random rather than by prearrangement; however, the Board nonetheless believes the Policy stated herein is appropriate in order to comply with the Act; and
WHEREAS, the Policy stated herein is not intended to address the dissemination of factual information pertaining to Township business such as meeting dates and times; and
WHEREAS, the Right to Know Act, Act 3 of 2008, as amended (the “New Law”) became effective January 1, 2009; and
WHEREAS, under the New Law, all Township records, including e-mails, are presumed to be public records and subject to disclosure.
BE IT RESOLVED THAT the foregoing recitals are incorporated herein by reference and deemed essential parts hereof.
BE IT FURTHER RESOLVED THAT in consideration of the requirements of the Act and the New Law, the Board hereby establishes regulations for the use of e-mail by the members of the Board, Township Staff, the ABCs and/or Advisory Groups in accordance with the following guidelines:
- Deliberations and official actions among a quorum of the Board, ABCs and/or Advisory Groups shall not take place by means of the exchange of e-mails, whether via personal e-mail accounts or Township e-mail accounts.
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2010\10-43 E-Mail Policy with Archiving 112310.doc
- For the purpose of this Resolution, “deliberation” shall include the discussion of Township business held for the purpose of making a decision as well as the making of any recommendation or providing an individual position or opinion on Township business.
- For purposes of this Resolution, “official actions” means the establishment of policy; decisions on Township business; and a vote or recommendation on any motion, proposal, rule, regulation, statute, ordinance, report or order.
- Nothing in this Resolution shall preclude any member of the Board, Township Staff, any ABCs and/or Advisory Groups from communicating by e-mail with one or more members of the Board or any ABCs or any Advisory Group, including a quorum of the Board or any ABCs or any Advisory Group, for the purpose of disseminating or sharing information pertinent to Township business. For the purpose of this Resolution, “information” is defined as a series of factual statements related to meeting schedules and agendas, including supporting background documents and data, to be discussed at a future meeting.; Background data created for a particular business item should be acknowledged at the next public meeting where the item is discussed.
- E-mails received from Township residents may be acknowledged at the next regular public meeting after receipt of such e-mails.
- Township e-mail accounts shall be used strictly for Township business. Township e-mail accounts shall not be used for viewing, accessing or transmitting any material that a reasonable individual may find personally offensive or inappropriate, including sexually suggestive materials. All information sent and/or received via the Township e-mail accounts and the Township server is and shall be the property of the Township. The contents of all such e-mail accounts shall be considered public records unless it can be shown that the e-mail content falls under one of the exclusions of the New Law.; Township e-mail accounts shall not be used to communicate material such as, but not limited to, deliberations, decisions, official actions, opinions, and legal advice from the Township Solicitor without prior approval from the Township Solicitor or the Board.; The Township reserves the right to search and audit all work-provided electronic equipment of Township employees. The Township may monitor e-mail activity with or without notice, and no employee has an expectation of privacy with regard to Township e-mail accounts and electronic equipment.
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2010\10-43 E-Mail Policy with Archiving 112310.doc
- All emails sent and received from Township owned computers and through Township webmail/Outlook accounts will be archived in a Township sponsored email archival system. Emails will be archived in accordance with the schedule established by the Pennsylvania Historical and Museum Commission.
- Members of the Board of Supervisors, the Chairman of all the Township ABC’s, and Auditors, and the Chairman of any approved Township Advisory Group shall be issued a Township email account that is connected to the Township archival system and they will utilize either webmail or Outlook software for all emails related to Township business. All emails originated by ABC, Auditor, or Advisory Group members must include the chairman on distribution to ensure the email is included in the Township archival system. Emails received via personal email accounts that are Township related shall be forwarded to the Township archival system by either forwarding to your Township email account or forwarding to the Chairman of your group. The procedures in this paragraph shall become effective on January 1, 2011.
RESOLVED AND ADOPTED, this 23rd day of November, 2010.
|
ATTEST: [signature] |
EAST GOSHEN TOWNSHIP [signature] [signature: Thom Clapper] [signature: Marty Shane] [signature: C.R. Baltzer] [signature: Donald R. McConathy] |
|---|
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2010\10-43 E-Mail Policy with Archiving 112310.doc
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 12/30/2010
To: All ABC’s
From: Mark Gordon, Township Zoning Officer [signature: MLG]
Re: ABC Packet Generation Recommendation
Dear ABC Members:
The Township staff has learned a lot over the last several weeks regarding the work processes required to generate the packets for all the Boards and Commissions. I have proposed the following modifications to the process to the Board of Supervisors and they have asked me to solicit your feedback for consideration.
The staff is challenged weekly with an extensive process to produce information packets for the various Boards and Commissions. Due to the reduction in force here within the Township administration, we must make some changes in order to more efficiently produce the packets while capturing savings in reduced or eliminated postage, delivery expenses and supplies. I recommend the following for each ABC Packet, many of which have been implemented already with positive results:
BOS:
Board Members: Hard Copies delivered for all Board Members to their residence as it is done today, no change.
ABC Liaisons: Electronic Copy via constant contact
Recording Secretary: Hard Copy placed in their bin on the Friday prior to the meeting and electronic version via constant contact.
Staff Liaison: Hard Copy
Others: Electronic Copy via constant contact
F:\Data\Shared Data\Admin Dept\Packets\Memo to ABC's 12302010.doc
PC:
Commission Members: Hard Copies delivered for all Commission Members to their residence as it is done today, either via US MAIL or Hand Delivered depending on the size. If mailing the packets is going to be more than $20 we will hand deliver.
BOS Liaison: Hard Copy, just like the PC Members.
ABC Liaisons: Electronic Copy via constant contact
Recording Secretary: Hard Copy placed in their bin on the Friday prior to the meeting and electronic copy via constant contact
Staff Liaison: Hard Copy
Others: Electronic Copy via constant contact
MA:
Authority Members: Hard Copies delivered for all Authority Members to their residence as it is done today.
BOS Liaison: Hard Copy Just like the Authority Members
ABC Liaisons: Electronic Copy via constant contact
Recording Secretary: Hard Copy placed in their bin on the Friday prior to the meeting and electronic copy via constant contact
Staff Liaison: Hard Copy
Others: Electronic Copy via constant contact
HC/P&R/CB:
Comm. /Board Members: Electronic Copy via constant contact
BOS Liaison: Electronic Copy via constant contact
ABC Liaisons: Electronic Copy via constant contact
Recording Secretary: Electronic Copy via constant contact
Staff Liaison: Electronic Copy via constant contact
Others: Electronic Copy via constant contact
Traffic Advisory / Deer Comm. / ZHB
These Bodies rarely meet and have rarely any info to distribute so all correspondence will be via constant contact
Correspondence received via Mail will be hand carried by the Staff liaison to the ABCs who do not receive hard copy packets in the mail. Time sensitive materials will be addressed as appropriate by the staff as needed.
These efforts to reduce the amount of paper, streamline the process and eliminate postage are long overdue and must be embraced by the ABC’s to the greatest extent possible. Please discuss these suggestions and forward your comments to me via email (above) by January 25, 2011 so I can compile them for consideration by the Board of Supervisors.
Thank you
F:\Data\Shared Data\Admin Dept\Packets\Memo to ABC's 12302010.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
January 7, 2011
To: Municipal Authority
From: Mark Miller
Re: December 2010 Monthly Report
| Meter: | Allied Control was out to calibrate the meters. They made some minor adjustments to the Ellis Lane meter. The other meters were fine. |
|---|---|
| C.C. Collection: | We were notified of two lateral clogs, one was in Mary Dell and the other was at the Reserve of Spring Meadows. Both were cleared. |
| Pump Stations: | Pump station wet wells were cleaned as part of the maintenance program. |
| R.C. Collection: | We placed two sewer caps in Clock Tower. |
| Lockwood Plant: | The plant was visited on a routine basis. |
| Ridley Creek Plant: | It has been a very busy month at the plant, as we experienced several problems with the SBR operation. I will leave the explaining to Scott Towler. |
| Pa One Calls: | We received 50 PA One calls for the Month of December. |
| Alarms: | 27 alarms for the month of December. We received a float alarm at the Ashbridge Station for high level. We were able to isolate the problem and we replaced the float. |
f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority december report.doc
East Goshen Township Flows
November
2010
[stamp: DEC 14 2010]
| Date | West Goshen Plant Flow mgd | West. Way Pump Station mgd | Ellis Lane Meter Pit mgd | Paoli Pike Meter Pit mgd | Wilson Drive Meter Pit mgd | West. Way Meter Pit mgd | Total East Goshen Flow mgd |
|---|---|---|---|---|---|---|---|
| 1 | 3.948 | 1.380 | 0.102 | 0.047 | 0.074 | 1.070 | 0.847 |
| 2 | 3.949 | 1.426 | 0.112 | 0.044 | 0.084 | 1.020 | 0.780 |
| 3 | 4.338 | 1.386 | 0.114 | 0.052 | 0.078 | 1.220 | 0.976 |
| 4 | 6.008 | 1.920 | 0.176 | 0.067 | 0.095 | 1.660 | 1.322 |
| 5 | 4.609 | 1.548 | 0.124 | 0.048 | 0.061 | 1.107 | 0.874 |
| 6 | 4.429 | 1.484 | 0.125 | 0.049 | 0.061 | 1.108 | 0.873 |
| 7 | 4.888 | 1.632 | 0.124 | 0.048 | 0.077 | 1.128 | 0.889 |
| 8 | 4.145 | 1.407 | 0.114 | 0.049 | 0.067 | 1.117 | 0.891 |
| 9 | 4.210 | 1.411 | 0.110 | 0.046 | 0.069 | 1.076 | 0.852 |
| 10 | 4.502 | 1.487 | 0.109 | 0.020 | 0.075 | 1.223 | 1.016 |
| 11 | 4.059 | 1.385 | 0.112 | 0.050 | 0.045 | 1.038 | 0.836 |
| 12 | 4.176 | 1.326 | 0.107 | 0.051 | 0.046 | 1.039 | 0.834 |
| 13 | 4.380 | 1.417 | 0.108 | 0.050 | 0.045 | 1.038 | 0.836 |
| 14 | 4.267 | 1.447 | 0.107 | 0.053 | 0.106 | 1.175 | 0.900 |
| 15 | 4.082 | 1.366 | 0.116 | 0.053 | 0.104 | 1.142 | 0.869 |
| 16 | 4.145 | 1.491 | 0.110 | 0.052 | 0.087 | 1.071 | 0.819 |
| 17 | 4.511 | 1.455 | 0.118 | 0.039 | 0.056 | 1.201 | 0.944 |
| 18 | 4.381 | 1.432 | 0.103 | 0.040 | 0.056 | 1.028 | 0.830 |
| 19 | 4.198 | 1.387 | 0.104 | 0.039 | 0.057 | 1.029 | 0.828 |
| 20 | 4.142 | 1.406 | 0.103 | 0.047 | 0.056 | 1.028 | 0.830 |
| 21 | 4.271 | 1.467 | 0.108 | 0.048 | 0.097 | 1.100 | 0.848 |
| 22 | 4.108 | 1.410 | 0.107 | 0.024 | 0.090 | 1.092 | 0.847 |
| 23 | 4.183 | 1.414 | 0.107 | 0.024 | 0.055 | 1.070 | 0.884 |
| 24 | 4.369 | 1.411 | 0.107 | 0.034 | 0.055 | 1.070 | 0.884 |
| 25 | 4.501 | 1.362 | 0.107 | 0.035 | 0.046 | 1.583 | 1.392 |
| 26 | 3.739 | 1.430 | 0.111 | 0.034 | 0.047 | 1.583 | 1.389 |
| 27 | 3.816 | 1.377 | 0.112 | 0.034 | 0.046 | 1.583 | 1.392 |
| 28 | 4.197 | 1.455 | 0.111 | 0.070 | 0.070 | 1.065 | 0.858 |
| 29 | 4.508 | 1.392 | 0.103 | 0.034 | 0.070 | 1.065 | 0.858 |
| 30 | 4.332 | 1.481 | 0.124 | 0.049 | 0.113 | 1.161 | 0.875 |
| 31 | |||||||
| 1 | |||||||
| Total | 129.39 | 43.39 | 3.40 | 1.33 | 2.11 | 34.93 | 28.09 |
| Avg. | 4.313 | 1.446 | 0.113 | 0.044 | 0.070 | 1.164 | 0.936 |
NOTES:
2008 FLOWMETERS
2010 DECEMBER 4TH QUARTER
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY GPD | ELLIS LANE READING | ELLIS LANE GPD | PAOLI PIKE READING | PAOLI PIKE GPD | WILSON DRIVE READING | WILSON DRIVE GPD | SUMMIT GPD | NET FLOWS | DATE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 12/01/10 | 1,877,921 | 1,123,000 | 16,442,799 | 114,625 | 8,905,928 | 41,180 | 10,543,856 | 90,995 | 20,400 | 876,200 | 12/01/10 |
| 0.00 | 12/02/10 | 1,879,538 | 1,617,000 | 16,462,763 | 199,640 | 8,911,830 | 59,020 | 10,553,411 | 95,550 | 20,400 | 1,262,790 | 12/02/10 |
| 0.00 | 12/03/10 | 20,400 | 0 | 12/03/10 | ||||||||
| 0.00 | 12/04/10 | 20,400 | 0 | 12/04/10 | ||||||||
| 0.00 | 12/05/10 | 20,400 | 0 | 12/05/10 | ||||||||
| 0.00 | 12/06/10 | 1,884,070 | 1,133,000 | 16,511,502 | 121,848 | 8,926,245 | 36,038 | 10,576,286 | 57,188 | 20,400 | 917,928 | 12/06/10 |
| 0.00 | 12/07/10 | 20,400 | 12/07/10 | |||||||||
| 0.00 | 12/08/10 | 1,886,316 | 1,123,000 | 16,533,868 | 111,830 | 8,935,234 | 44,945 | 10,590,917 | 73,155 | 20,400 | 893,070 | 12/08/10 |
| 0.00 | 12/09/10 | 1,887,398 | 1,082,000 | 16,544,374 | 105,060 | 8,940,107 | 48,730 | 10,598,124 | 72,070 | 20,400 | 856,140 | 12/09/10 |
| 0.00 | 12/10/10 | 1,888,492 | 1,094,000 | 16,554,053 | 96,790 | 8,944,474 | 43,670 | 10,605,387 | 72,630 | 20,400 | 880,910 | 12/10/10 |
| 0.00 | 12/11/10 | 20,400 | 0 | 12/11/10 | ||||||||
| 1.20 | 12/12/10 | 20,400 | 0 | 12/12/10 | ||||||||
| 0.00 | 12/13/10 | 20,400 | 0 | 12/13/10 | ||||||||
| 0.00 | 12/14/10 | 20,400 | 0 | 12/14/10 | ||||||||
| 0.00 | 12/15/10 | 1,894,709 | 1,243,400 | 16,619,890 | 131,674 | 8,968,307 | 47,666 | 10,636,899 | 63,024 | 20,400 | 1,001,036 | 12/15/10 |
| 0.10 | 12/16/10 | 20,400 | 0 | 12/16/10 | ||||||||
| 0.00 | 12/17/10 | 20,400 | 0 | 12/17/10 | ||||||||
| 0.00 | 12/18/10 | 20,400 | 0 | 12/18/10 | ||||||||
| 0.00 | 12/19/10 | 20,400 | 0 | 12/19/10 | ||||||||
| 0.00 | 12/20/10 | 20,400 | 0 | 12/20/10 | ||||||||
| 0.00 | 12/21/10 | 1,901,590 | 1,146,833 | 16,687,281 | 112,318 | 8,995,502 | 45,325 | 10,668,856 | 53,262 | 20,400 | 935,928 | 12/21/10 |
| 0.00 | 12/22/10 | 1,902,729 | 1,139,000 | 16,698,048 | 107,670 | 9,000,436 | 49,340 | 10,675,135 | 62,790 | 20,400 | 919,200 | 12/22/10 |
| 0.00 | 12/23/10 | 1,903,862 | 1,133,000 | 16,708,208 | 101,600 | 9,005,332 | 48,960 | 10,681,618 | 64,830 | 20,400 | 917,610 | 12/23/10 |
| 0.00 | 12/24/10 | 20,400 | 0 | 12/24/10 | ||||||||
| 0.00 | 12/25/10 | 20,400 | 0 | 12/25/10 | ||||||||
| 0.15 | 12/26/10 | 20,400 | 0 | 12/26/10 | ||||||||
| 0.00 | 12/27/10 | 20,400 | 0 | 12/27/10 | ||||||||
| 0.00 | 12/28/10 | 20,400 | 0 | 12/28/10 | ||||||||
| 0.00 | 12/29/10 | 20,400 | 0 | 12/29/10 | ||||||||
| 0.00 | 12/30/10 | 1,910,415 | 936,143 | 16,769,158 | 87,071 | 9,034,082 | 41,071 | 10,706,363 | 35,350 | 20,400 | 772,650 | 12/30/10 |
| 0.00 | 12/31/10 | 20,400 | 12/31/10 | |||||||||
| 2.45 | 1,160,943 | 117,284 | 45,995 | 67,349 |
| Metric | DAILY LOC | INQUIRER | EG TWP |
|---|---|---|---|
| MONTH TO DATE | 2.45 | ||
| NORMAL MONTH TO DATE | |||
| YEAR TO DATE | 66 | ||
| NORMAL YEAR TO DATE |
2007 flowmeters -all-stations separate month worksheets.xls
2008 FLOWMETERS
2010 DECEMBER 4TH QUARTER
| HERSHEY'S MILL READING | HERSHEY'S MILL GPD | ASHBRIDGE READING | ASHBRIDGE GPD | HICKS METER READING | HICKS METER GPD | RESERVOIR READING | RESERVOIR GPD | SHERMAN READING | SHERMAN GPD | BARKWAY READING | BARKWAY GPD |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 19,943,149 | 51,240 | 969,659 | 66,150 | 15,406,795 | 328,545 | 109,969,632 | 744,010 | 466,303 | 5,925 | 1,742,665 | 11,235 |
| 19,949,700 | 65,510 | 970,856 | 119,700 | 15,447,120 | 403,250 | 110,069,874 | 1,002,420 | 467,062 | 7,590 | 1,743,928 | 12,630 |
| 19,973,209 | 58,773 | 973,867 | 75,275 | 15,559,756 | 281,590 | 110,359,443 | 723,923 | 469,506 | 6,110 | 1,748,772 | 12,110 |
| 19,984,159 | 54,750 | 975,212 | 67,250 | 15,621,560 | 309,020 | 110,505,436 | 729,965 | 470,718 | 6,060 | 1,751,107 | 11,675 |
| 19,989,464 | 53,050 | 975,848 | 63,600 | 15,652,905 | 313,450 | 110,575,555 | 701,190 | 471,260 | 5,420 | 1,752,337 | 12,300 |
| 19,994,883 | 54,190 | 976,496 | 64,800 | 15,683,746 | 308,410 | 110,646,240 | 706,850 | 471,944 | 6,840 | 1,753,476 | 11,390 |
| 20,024,302 | 58,838 | 980,651 | 83,100 | 15,836,238 | 304,984 | 111,037,822 | 783,164 | 474,956 | 6,024 | 1,759,640 | 12,328 |
| 20,059,201 | 58,165 | 984,915 | 71,067 | 16,004,857 | 281,032 | 111,472,943 | 725,202 | 478,590 | 6,057 | 1,767,104 | 12,440 |
| 20,065,054 | 58,530 | 985,607 | 69,200 | 16,035,243 | 303,860 | 111,547,129 | 741,860 | 479,259 | 6,690 | 1,768,346 | 12,420 |
| 20,070,853 | 57,990 | 986,271 | 66,400 | 16,066,292 | 310,490 | 111,622,035 | 749,060 | 479,917 | 6,580 | 1,769,596 | 12,500 |
| 20,108,517 | 53,806 | 990,273 | 57,171 | 16,220,448 | 220,223 | 112,049,820 | 611,121 | 483,810 | 5,561 | 1,777,946 | 11,929 |
| 56,804 | 73,065 | 305,896 | 747,160 | 6,260 | 12,087 |
2007 flowmeters -all-stations separate month worksheets.xls
2010 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,425,517 | 123,265 | 81,325 | 63,991 | 20,400 | 83,711 | 103,900 | 363,921 | 882,367 | 5,627 | 13,543 |
| FEBRUARY | 1,462,759 | 132,866 | 74,793 | 70,879 | 20,400 | 77,500 | 103,327 | 332,371 | 906,362 | 5,456 | 13,156 |
| MARCH | 1,603,009 | 170,328 | 75,607 | 63,240 | 20,400 | 102,840 | 146,865 | 404,526 | 1,071,132 | 5,071 | 19,213 |
| APRIL | 59,434 | 174,279 | 89,043 | 67,148 | 20,400 | 85,455 | 126,703 | 386,665 | 991,262 | 5,303 | 13,956 |
| MAY | 1,317,648 | 145,694 | 87,062 | 54,671 | 20,400 | 63,587 | 86,855 | 355,426 | 836,562 | 5,802 | 11,248 |
| JUNE | 1,225,309 | 126,607 | 78,857 | 70,230 | 20,400 | 57,796 | 67,285 | 353,596 | 802,473 | 5,804 | 11,194 |
| JULY | 1,106,553 | 128,794 | 61,615 | 108,460 | 20,400 | 51,263 | 61,149 | 332,264 | 727,562 | 4,751 | 10,465 |
| AUGUST | 1,053,504 | 149,151 | 61,447 | 107,885 | 20,400 | 47,989 | 59,434 | 324,438 | 683,558 | 5,412 | 8,486 |
| SEPTEMBER | 1,032,377 | 125,642 | 56,133 | 94,124 | 20,400 | 45,339 | 59,940 | 357,186 | 650,049 | 5,465 | 10,401 |
| OCTOBER | 1,241,095 | 136,285 | 49,227 | 79,650 | 20,400 | 33,650 | 81,895 | 328,383 | 781,909 | 6,397 | 11,637 |
| NOVEMBER | 1,070,342 | 108,388 | 45,529 | 74,222 | 20,400 | 51,286 | 67,644 | 290,645 | 698,788 | 6,045 | 10,636 |
| DECEMBER | 1,160,943 | 117,284 | 45,995 | 67,349 | 20,400 | 56,804 | 73,065 | 305,896 | 747,160 | 6,260 | 12,087 |
| Total Flows | |||||||||||
| Monthly Ave | 1,146,541 | 136,549 | 67,219 | 76,821 | 20,400 | 63,102 | 86,505 | 344,610 | 814,932 | 5,616 | 12,169 |
To West Goshen: 865,952
2010 flowmeters -all-stations separate month worksheets.xlsSUMMARY
Flowmeters Dec. 2010
Legend: December
Y-axis (Flows): 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000
X-axis (Day of the month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
Monthly Totals 2010 Jan-Dec
Y-axis (Flowmeters): 0, 500000, 1000000, 1500000, 2000000, 2500000
X-axis (Month): January, February, March, April, May, June, July, August, September, October, November, December
December Precip. 2.45 - 2010
Legend: December
Y-axis (Precip.): 0, 0.5, 1, 1.5, 2, 2.5
X-axis (snow/rain): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
Monthly Totals 2010 (Jan-Dec)
Legend: Monthly Totals
Y-axis (Precip.): 0, 2, 4, 6, 8, 10, 12, 14, 16
X-axis (Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
WEST GOSHEN SEWER AUTHORITY
REGULAR MEETING
January 5, 2011
The regular meeting of the West Goshen Sewer Authority was held on Wednesday, January 5, 2011 at the STP Administration Building. Those present were:
|
Authority |
Supervisor Administration |
Unruh, Turner Glace Associates, Inc. |
|---|
Ken Fuller was absent. Jack Yahraes, East Goshen, was in attendance. John Hall and Bill Hall were in attendance to review the TMDL issues and status.
The regular meeting of the Authority was called to order at 7:30 P.M. by 2010 Vice-Chairman, Mike Arnold. The Vice-Chairman then called for approval of the minutes from the December 1, 2010 meeting. On motion by John Windle, seconded by Dave Johnson, the minutes were unanimously approved.
The 2010 Vice-Chairman called for the annual reorganization of the West Goshen Sewer Authority. Kevin Snoke nominated Mike Arnold for Chairman, seconded by Frank Biasi, Mike Arnold was appointed Chairman. Mike Arnold announced the proposed Board Members, Advisors, Consultants and Pay Scales for 2011 and requested the approval on the following recommendations:
Board Members:
| Chairman | Mike Arnold |
|---|---|
| Vice – Chairman | Dave Johnson |
| Treasurer | John Windle |
| Secretary | Kevin Snoke |
| Asst. Secretary | Frank Biasi |
| Recording Secretary | Tina Collins |
| Member | Ken Fuller |
| Member | Ron Rothrock |
1
Board Advisors and Consultants for 2011:
| Consulting Engineer | Glace Associates, Inc. |
|---|---|
| Solicitor | Unruh, Turner, Burke and Frees |
| Auditors | Barbacane, Thorntoon and Company |
| Trustee | Fulton Financial Advisors, NA |
| Financial Advisor | Gordon Walker, PFM |
Pay Scale for 2011 Board Officers, Consultants and Advisors:
| Recording Secretary | $270.00/quarter |
|---|---|
| Treasurer | $250.00/quarter |
| Glace Associates, Inc. | $250.00/quarter |
| Barbacane, Thornton & Co | Estimated at $12,700 for 2010 audit |
| Fulton Financial Advisors | Fees billed periodically |
| Gordon Walker, PFM | Billed as needed |
| Unruh, Turner, Burke & Frees | General Authority work @ $180.00/hr. |
Meetings are set for the 1st Wednesday of every month.
John Windle motioned to approve, seconded by Frank Biasi, the motion passed unanimously.
Ross Unruh presented the Solicitor's Report for the month. The EHB hearings have been completed and the transcript is ready. The grinder pump agreement has been prepared and sent out for Liberty Tools and he is awaiting a response. The bonds have been paid, Ross is getting suggestions as to where to invest the money to receive more interest than it is currently making. The LOC for Greystone South has been received.
Frank Biasi made a motion to approve the Fee Engagement Letter from Steve Hann with fees to be billed monthly, seconded by Kevin Snoke, motion unanimously approved.
Max Stoner gave the Engineers report dated January 5, 2010: (See report for details)
- Current Items Pumping Station Nos. 1 & 6 Upgrade General construction work has a few minor items to be done at PS#1 by the plant staff. The closeout paperwork has come back from Brandywine Electrical.; Goose Creek Stream Study/TMDL Permit Issues The TMDL issues are winding their way through the court system and EHB.; Washington Street Pump Station Blooming Glen Contractors continue to work at the station on punch list items. The electrical contract paperwork has been completed.
2
- The Arbours at West Goshen – Nothing New This Month
- Goshen Leisure Development Nothing New This Month
- West Goshen Business Park This is a proposed 115 unit age restricted apartment complex on a lot in West Goshen Business Park. A letter of sewer capacity was required for a conditional use hearing.
- Zarelli Subdivision 825 Goshen Road Nothing new this month.
- Margarita's Site Development Waiting for as-built plans. Nothing new this month.
- Wexford Mews Waiting for as-built plans. Nothing new this month.
- Jerrehian Estate Large Tract Glace has started to review the sanitary sewer plans for the proposed 598 unit development. They are still proposing two (2) pumping stations. They have provided preliminary plans. We are considering possible tie-ins to Hamilton Woods and portions of the Caswallen development. The review has been completed with no major issues on the proposed design, the review letter was sent out last month. An engineering firm contacted Max about requirements for two proposed sewage pumping stations that are required for the development. Small Tract Site work has been started.
- Greenhill Corporate Park – Lot 11 Drury Development Company is proposing a 2 ½ story 34,480 s.f. office building at 1171 McDermott Drive. There are no major issues with the sewer for this proposed project. this was approved at the planning commission in July.
- Village of Shannon – Shadeland Woods They are continuing to construct units in this development.
- Lincoln Independence Park Nothing New This Month
- South Concord Road / Glenn White Subdivision This is a 20-lot single family residential subdivision of a portion of the Rolling Green Cemetery north of Amelia Drive. The site and sanitary sewer improvements have been started. There are some existing homes which may be able to connect to their proposed gravity collection system. The developer has agreed to provide a right of way to serve existing homes in the area. As per the Authority's previous policy the Authority would
3
reimburse the developer for the actual cost of the sewer main extension. Ross has provided the developer's agreement and letter of credit forms to the developer's attorney. The developer has provided the right of way plats and descriptions as well as post construction escrow as well as the easements and minor revisions to the plans. The clearing and grubbing of the site has begun.
- DLH Development – Reservoir Property Waiting for as-built drawings and dedication documents. D.L. Howell relocated their office to one of these buildings earlier this month.
- Domestic Violence Center Need record drawings of the tie-in to the system. Nothing new this month.
- Gavin Property – 415 Goshen Road Nothing New This Month
- Liberty Tools This property will be served by a grinder pump. They have proposed to tie a few other lots into the low pressure system. John Scott has agreed with this concept which was done on Delaware Avenue and Wexford Mews. Ross has been discussing individual grinder pump agreements for each property that will connect to the system with the attorney for Liberty Tools. Nothing new this month.
- Kirkland Woods This is a new 7 lot sub-division on 4.3 acres, located at Kirkland Avenue and Ashbridge Road. The sanitary sewer main needs extended but no rights of ways are involved. A developer's agreement will need to be entered into between the Authority and the developer. The plan received approval from the Township and they have contacted Ross and our office to establish a construction escrow account. They reviewed and approved the construction escrow account.
- QVC Warehouse QVC is planning an approximately 60,000 s.f. addition to its warehouse. There appear to be no significant issues with the sanitary sewer system for the proposed addition.
- R.E. Michel This is a proposed 14,542 s.f. warehouse/storage/office HVAC facility to be constructed on the existing R.E. Michel property on the south side of Westtown Road. No major issues with the sewer for this proposed project. This project is currently under construction.
- Fame Fire Company Expansion Proposed 4,000 s.f. addition located at S. Matlack & Rosedale Ave. This does not Significantly affect the Authority's system. A review letter was sent out in December.
The following invoices and requisitions were moved for approval by John Windle, seconded by Kevin Snoke, and unanimously approved:
4
ADMINISTRATIVE EXPENSES:
| PAYEE | PURPOSE | AMOUNT |
|---|---|---|
| Unruh | General Representation | $ 344.50 |
| Glace Assoc. | 1st Quarter Retainer | $ 250.00 |
| Fulton Financial | Bond Payoff Fee | $ 1,500.00 |
| PMAA | Dues | $ 950.00 |
| Comm. Of Pa. | Corporate Name | $ 70.00 |
DEVELOPER ACCOUNTS:
| PAYEE | DEVELOPER | AMOUNT |
|---|---|---|
| Unruh, Turner | South Concord Road – Glen White | $ 90.00 |
| Glace & Assoc. | Greystone South | $ 66.00 |
| Unruh, Turner | Greystone South | $ 1,116.00 |
| Glace & Assoc. | Glen White – Quaker Ridge | $ 66.00 |
On a motion by John Windle, and seconded by Frank Biasi, the following bills were approved for payment.
BOND REMEMPTION & IMPROVEMENT FUND:
| REQUISITION # | PAYEE | PURPOSE | AMOUNT |
|---|---|---|---|
| 1415 | Glace & Associates | Act 537 Plan, Washington St. PS, P.S. #6 Upgrade TMDL | $ 1,125.64 |
| 1416 | Hall & Associates | Periphyton Group NPDES Permit Chester Creek TMDL | $ 2,748.14 |
| 1417 | Unruh, Turner, Burke & Frees | Appeal to EHB | $ 1,756.00 |
5
Dave Johnson made a motion to appoint Ron Rothrock as a full member, seconded by John Windle, motion unanimously approved.
John Windle made a motion to have Mike Arnold, Kevin Snoke and Dave Johnson added to the signature cards with him for check signing at the bank, seconded by Frank Biasi, motion passed unanimously.
TRUSTEE BALANCES (as of November 30, 2010)
| Tapping Fee - | $ 6,845,615.91 |
|---|---|
| BR&I - | $ 1,390.07 |
Dr. White – Greystone has started excavation. There are two new members on the ZHB.
There being no further business, on motion by Frank Biasi, seconded by Ron Rothrock, the meeting was adjourned at 9:27 p.m.
Respectfully submitted,
Tina Charron, Recording Secretary
6
WEST GOSHEN SEWER AUTHORITY
REGULAR MEETING
January 5, 2011
The regular meeting of the West Goshen Sewer Authority was held on Wednesday, January 5, 2011 at the STP Administration Building. Those present were:
| Authority Mike Arnold Kevin Snoke Frank Biasi John Windle Dave Johnson Ron Rothrock, alt. |
Supervisor Dr. Robert White |
Unruh, Turner Ross Unruh |
|---|---|---|
| Administration John Scott |
Glace Associates, Inc. Max Stoner |
Ken Fuller was absent. Jack Yahraes, East Goshen, was in attendance. John Hall and Bill Hall were in attendance to review the TMDL issues and status.
The regular meeting of the Authority was called to order at 7:30 P.M. by 2010 Vice-Chairman, Mike Arnold. The Vice-Chairman then called for approval of the minutes from the December 1, 2010 meeting. On motion by John Windle, seconded by Dave Johnson, the minutes were unanimously approved.
The 2010 Vice-Chairman called for the annual reorganization of the West Goshen Sewer Authority. Kevin Snoke nominated Mike Arnold for Chairman, seconded by Frank Biasi, Mike Arnold was appointed Chairman. Mike Arnold announced the proposed Board Members, Advisors, Consultants and Pay Scales for 2011 and requested the approval on the following recommendations:
Board Members:
| Chairman | Mike Arnold |
|---|---|
| Vice – Chairman | Dave Johnson |
| Treasurer | John Windle |
| Secretary | Kevin Snoke |
| Asst. Secretary | Frank Biasi |
| Recording Secretary | Tina Collins |
| Member | Ken Fuller |
| Member | Ron Rothrock |
1
Board Advisors and Consultants for 2011:
| Consulting Engineer | Glace Associates, Inc. |
|---|---|
| Solicitor | Unruh, Turner, Burke and Frees |
| Auditors | Barbacane, Thorntoon and Company |
| Trustee | Fulton Financial Advisors, NA |
| Financial Advisor | Gordon Walker, PFM |
Pay Scale for 2011 Board Officers, Consultants and Advisors:
| Recording Secretary | $270.00/quarter |
|---|---|
| Treasurer | $250.00/quarter |
| Glace Associates, Inc. | $250.00/quarter |
| Barbacane, Thornton & Co | Estimated at $12,700 for 2010 audit |
| Fulton Financial Advisors | Fees billed periodically |
| Gordon Walker, PFM | Billed as needed |
| Unruh, Turner, Burke & Frees | General Authority work @ $180.00/hr. |
Meetings are set for the 1st Wednesday of every month.
John Windle motioned to approve, seconded by Frank Biasi, the motion passed unanimously.
Ross Unruh presented the Solicitor's Report for the month. The EHB hearings have been completed and the transcript is ready. The grinder pump agreement has been prepared and sent out for Liberty Tools and he is awaiting a response. The bonds have been paid, Ross is getting suggestions as to where to invest the money to receive more interest than it is currently making. The LOC for Greystone South has been received.
Frank Biasi made a motion to approve the Fee Engagement Letter from Steve Hann with fees to be billed monthly, seconded by Kevin Snoke, motion unanimously approved.
Max Stoner gave the Engineers report dated January 5, 2010: (See report for details)
- Current Items Pumping Station Nos. 1 & 6 Upgrade General construction work has a few minor items to be done at PS#1 by the plant staff. The closeout paperwork has come back from Brandywine Electrical.; Goose Creek Stream Study/TMDL Permit Issues The TMDL issues are winding their way through the court system and EHB.; Washington Street Pump Station Blooming Glen Contractors continue to work at the station on punch list items. The electrical contract paperwork has been completed.
2
- The Arbours at West Goshen – Nothing New This Month
- Goshen Leisure Development Nothing New This Month
- West Goshen Business Park This is a proposed 115 unit age restricted apartment complex on a lot in West Goshen Business Park. A letter of sewer capacity was required for a conditional use hearing.
- Zarelli Subdivision 825 Goshen Road Nothing new this month.
- Margarita's Site Development Waiting for as-built plans. Nothing new this month.
- Wexford Mews Waiting for as-built plans. Nothing new this month.
- Jerrehian Estate Large Tract Glace has started to review the sanitary sewer plans for the proposed 598 unit development. They are still proposing two (2) pumping stations. They have provided preliminary plans. We are considering possible tie-ins to Hamilton Woods and portions of the Caswallen development. The review has been completed with no major issues on the proposed design, the review letter was sent out last month. An engineering firm contacted Max about requirements for two proposed sewage pumping stations that are required for the development. Small Tract Site work has been started.
- Greenhill Corporate Park – Lot 11 Drury Development Company is proposing a 2 ½ story 34,480 s.f. office building at 1171 McDermott Drive. There are no major issues with the sewer for this proposed project. this was approved at the planning commission in July.
- Village of Shannon – Shadeland Woods They are continuing to construct units in this development.
- Lincoln Independence Park Nothing New This Month
- South Concord Road / Glenn White Subdivision This is a 20-lot single family residential subdivision of a portion of the Rolling Green Cemetery north of Amelia Drive. The site and sanitary sewer improvements have been started. There are some existing homes which may be able to connect to their proposed gravity collection system. The developer has agreed to provide a right of way to serve existing homes in the area. As per the Authority's previous policy the Authority would
3
reimburse the developer for the actual cost of the sewer main extension. Ross has provided the developer's agreement and letter of credit forms to the developer's attorney. The developer has provided the right of way plats and descriptions as well as post construction escrow as well as the easements and minor revisions to the plans. The clearing and grubbing of the site has begun.
- DLH Development – Reservoir Property Waiting for as-built drawings and dedication documents. D.L. Howell relocated their office to one of these buildings earlier this month.
- Domestic Violence Center Need record drawings of the tie-in to the system. Nothing new this month.
- Gavin Property – 415 Goshen Road Nothing New This Month
- Liberty Tools This property will be served by a grinder pump. They have proposed to tie a few other lots into the low pressure system. John Scott has agreed with this concept which was done on Delaware Avenue and Wexford Mews. Ross has been discussing individual grinder pump agreements for each property that will connect to the system with the attorney for Liberty Tools. Nothing new this month.
- Kirkland Woods This is a new 7 lot sub-division on 4.3 acres, located at Kirkland Avenue and Ashbridge Road. The sanitary sewer main needs extended but no rights of ways are involved. A developer's agreement will need to be entered into between the Authority and the developer. The plan received approval from the Township and they have contacted Ross and our office to establish a construction escrow account. They reviewed and approved the construction escrow account.
- QVC Warehouse QVC is planning an approximately 60,000 s.f. addition to its warehouse. There appear to be no significant issues with the sanitary sewer system for the proposed addition.
- R.E. Michel This is a proposed 14,542 s.f. warehouse/storage/office HVAC facility to be constructed on the existing R.E. Michel property on the south side of Westtown Road. No major issues with the sewer for this proposed project. This project is currently under construction.
- Fame Fire Company Expansion Proposed 4,000 s.f. addition located at S. Matlack & Rosedale Ave. This does not Significantly affect the Authority's system. A review letter was sent out in December.
The following invoices and requisitions were moved for approval by John Windle, seconded by Kevin Snoke, and unanimously approved:
4
ADMINISTRATIVE EXPENSES:
| PAYEE | PURPOSE | AMOUNT |
|---|---|---|
| Unruh | General Representation | $ 344.50 |
| Glace Assoc. | 1st Quarter Retainer | $ 250.00 |
| Fulton Financial | Bond Payoff Fee | $ 1,500.00 |
| PMAA | Dues | $ 950.00 |
| Comm. Of Pa. | Corporate Name | $ 70.00 |
DEVELOPER ACCOUNTS:
| PAYEE | DEVELOPER | AMOUNT |
|---|---|---|
| Unruh, Turner | South Concord Road – Glen White | $ 90.00 |
| Glace & Assoc. | Greystone South | $ 66.00 |
| Unruh, Turner | Greystone South | $ 1,116.00 |
| Glace & Assoc. | Glen White – Quaker Ridge | $ 66.00 |
On a motion by John Windle, and seconded by Frank Biasi, the following bills were approved for payment.
BOND REMEMPTION & IMPROVEMENT FUND:
| REQUISITION # | PAYEE | PURPOSE | AMOUNT |
|---|---|---|---|
| 1415 | Glace & Associates | Act 537 Plan, Washington St. PS, P.S. #6 Upgrade TMDL | $ 1,125.64 |
| 1416 | Hall & Associates | Periphyton Group NPDES Permit Chester Creek TMDL | $ 2,748.14 |
| 1417 | Unruh, Turner, Burke & Frees | Appeal to EHB | $ 1,756.00 |
5
Dave Johnson made a motion to appoint Ron Rothrock as a full member, seconded by John Windle, motion unanimously approved.
John Windle made a motion to have Mike Arnold, Kevin Snoke and Dave Johnson added to the signature cards with him for check signing at the bank, seconded by Frank Biasi, motion passed unanimously.
TRUSTEE BALANCES (as of November 30, 2010)
| Tapping Fee - | $ 6,845,615.91 |
|---|---|
| BR&I - | $ 1,390.07 |
Dr. White – Greystone has started excavation. There are two new members on the ZHB.
There being no further business, on motion by Frank Biasi, seconded by Ron Rothrock, the meeting was adjourned at 9:27 p.m.
Respectfully submitted,
Tina Charron, Recording Secretary
6
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100, P.O. Box 562 p. 610.696.8225
West Chester, PA 19381-0562 www.gawthrop.com
Robert F. Adams
610.696.8225 x125
610.344.0922 fax
rfadams@gawthrop.com
December 22, 2010
Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Re: Re-appointment of Municipal Authority Solicitor for 2011
Dear Rick:
I think you know how much I value my opportunity to serve as the Solicitor to the Municipal Authority and to work with you and the other fine individuals who serve on the Authority Board. For this reason, it gave me pleasure to receive your letter of December 21st formally advising me of my re-appointment by the Authority on November 8th.
I share the pride of the Authority in the many strides forward it has made over the years I have served and I certainly look forward to having the continuing opportunity to be of service.
Very truly yours,
Bob
Robert F. Adams
RFA/lbb