Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
March, 14, 2011
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Cost Summary Report - Rick will provide at Mtg.; Change Orders – None
- RIDLEY CREEK INVOICES a. Brickhouse Environmental #5815 $ 6,670.00 b. Pennoni, #465223 $ 6,737.00 c. Expansion Expense $ 32.94 d. Gawthrop Greenwood, PC #87034 $ 385.00
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES February 14, 2011
- APPROVAL OF INVOICES a. Pennoni, #465221 $ 2,762.50 b. Pennoni, #465229 $ 1,491.25 c. Pennoni, #465288 $ 1,970.00 d. Pennoni, #465289 $ 1,542.50 e. Pennoni, #465228 $ 535.00 f. Gawthrop Greenwood, PC #87032 $ 760.00
- LIAISON REPORTS
- FINANCIAL REPORTS February Report
- OLD BUSINESS
- GOALS 2011 Goals
- NEW BUSINESS
- CAPACITY REQUESTS - None
- SEWER REPORTS Director of Public Works Report – February 2011; East Goshen Township Flows for 2010; Miller Environmental, Inc. Monthly Operations Report
- ANY OTHER MATTER
F:\Data\Shared Data\Agendas\Municipal Authority\2011\3-14-2011 .doc
- CORRESPONDENCE AND REPORTS OF INTEREST New address for Daniel Barbato, P.E.; Final land development plan letter from Toll Brothers for Applebrook Meadows
- PUBLIC COMMENT
- ADJOURNMENT
- EXECUTIVE SESSION - LEGAL
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| February 09, 2011 – Joe | April 1, 2011 |
| May 11, 2011 – Fran | July 1, 2011 |
| August 10, 2011 – Jack | October 1, 2011 |
| November 9, 2011- Dana | January 1, 2011 |
F:\Data\Shared Data\Agendas\Municipal Authority\2011\3-14-2011 .doc
Brickhouse Environmental
Consultants and Engineers
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
| Invoice number | 5815 |
|---|---|
| Date | 3/1/2011 |
| Client ID: 548 |
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of February 2011.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 58.00 | 6,670.00 |
| Labor Total | 58.00 | 6,670.00 |
| Reimbursable | Amount |
|---|---|
| 0.00 | |
| Expense Total | 0.00 |
| Invoice Total | 6,670.00 |
[Handwritten: Approved 3/9/2011 [Signature]]
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
When Creativity & Experience Count
www.brickhouse-environmental.com
Brickhouse Environmental
Project Accomplishments
BE Project No. 09-2532-0
East Goshen/Ridley Creek Sewage Treatment Plant Upgrade/Expansion
February 2011
The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project, including:
- 2-1-11 Review emails regarding Clinger meeting. Provide payroll data.
- 2-2-11 Email review and responses.
- 2-7-11 Review of Michael Geradi’s report. Review comments received for filamentous memo.
- 2-8-11 Compile input for the filamentous bacteris action plan memo. Gather additional information for causes and control of the filamentous bacteria identified in the samples analyzed by Michael Geradi. Email to Jeff Bush regarding warranty item status and change orders. Email to Bob Dina regarding status of punch list and studies.
- 2-11-11 Prepare summary of project activities for EGTMA for the month of January. Coordinate plant performance issues. Email review.
- 2-14-11 Prepare monthly Project Manager’s report and attend Municipal Authority meeting.
- 2-15-11 Telephone conversation with Jeff Bush regarding warranty items. Coordination with Siemens Sunlight to arrange for a service visit for UV bank number 2.
- 2-16-11 On site visit to RCSTP to check progress of filamentous bacterium control and plant operations with respect to total nitrogen and phosphorus removal. Confirmed with Sherwood Logan for compatibility of the alum feed pumps to be used to pump sodium hypochorite. Meeting with Rick Smith.
- 2-17-11 Site visit for replacement of surge protector on the main electrical panel (main BUS) for the wastewater treatment. Reviewed preparations for addition of chemicals for filamentous control. Chemical fed systems required additional work and implementation of the chemicals is not anticipated until Monday, February 21, 2011. Reviewed SBR air slope, min air, max air, settle time and influent fill times with Jesse Goldberg. Requested that the process control data be placed in a spreadsheet that can be provided to Siemens in preparation of the April visit. Exchanged emails with Jeff Bush to arrange for ACS to provide training on their control panel and equipment.
- 2-18-11 Meeting on site at RCSTP to meet with Clinger and check the status for replacement of the TVSS for the panel proving power for the centrifuge and related equipment. Met with Bob Dina for an update on punch list and studies. The Arc Fals
Brickhouse Environmental
and Short Circuit studies are complete and will be forwarded to Pennoni early next week for review and approval. Kevin (journeyman) and Ryan (apprentice) on site at RCSTP working on punch list items. Met with Mark Miller for a quick update of warranty issues. Emails and coordination with Jeff Bush to resolve outstanding issues. Review contract relative to when O&M manuals are to be delivered.
- 2-21-11 Follow up with Jesse Goldberg.
- 2-22-11 Emails with Jeff Bush to coordinate the Alfa Laval performance test and project management emails to Mark Miller.
- 2-23-11 On site visit to meet with Jeff Bush, Worth & Company regarding the Siemens Sunlight UV system and warranty issues. Reviewed operations of filamentous control. Deviation from plan through using the alum fed pump by hand rather than auto mode. Appears to be a communication issue between the alum feed pump and Siemens SBR control panel.
- 2-25-11 Meeting with Mark Miller to review items of concern as reported by Miller Environmental, Inc. Review outstanding warranty issues and scheduled repair visits. Visit to RCSTP.
- 3-1-11 Attend centrifuge acceptance performance test at RCSTP. Review operations and progress towards control of filamentous bacterium.
- 3-2-11 On site at RCSTP for the centrifuge acceptance test. Coordinated sample collection and records. Samples from Tuesday’s test were picked up for analysis. Prepared samples and chains-of-custody for samples. Technician from Siemens Sunlight on site to repair UV bank No. 2. The UV light sensor required replacement. UV system fully operational and returned to automatic mode.
- 3-3-11 On site at RCSTP working with Eric Darcy (remotely) towards troubleshooting the alum feed Watson-Marlow chemical feed pumps. Both alum feed pumps are not functionally in the auto mode for the hard HOA. Left a voicemail for Gary Roberts at ICI for assistance. Emails to Jeff Bush confirming the centrifuge acceptance test was completed.
- 3-4-11 On site at RCSTP for follow up to the Watson-Marlow alum chemical feed pumps and Siemens SBR panel. Meet with Operator to confirm training held on March 3, 2011 with Allied Control Systems for any follow up questions, SHT #1 telescopic valve operation and confirmation of alarms.
J:092532.0/Project Management/Bullets/2011 February Bullets.doc
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
Brickhouse’s contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours and $175,030.
From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.
The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting which then expended the original 1,522 hours.
The Board subsequently approved Brickhouse Environmental to continue to serve the Authority’s needs as requested on a T&M basis.
Monthly Project Management Subtotals Beyond the Original Budget
| Month | Project Subtotals | Monthly Fees | ||
|---|---|---|---|---|
| Pro. Mgt. Hours | Cumulative Hours | Cumulative Fees | ||
| October 2010 | 36.25 | 36.25 | $4,168.75 | $4,168.75 |
| November 2010 | 86.50 | 122.75 | $14,116.25 | $9,947.50 |
| December 2010 | 136.00 | 258.75 | $29,756.25 | $15,640.00 |
| January - February 4, 2011 | 97.75 | 356.50 | $40,997.50 | $11,241.25 |
| February - March 4, 2011 | 58.00 | 414.50 | $47,667.50 | $6,670.00 |
Project Cumulating Totals
| Project Management Hours | Fee |
|---|---|
| 1,936.50 | $222,697.50 |
Page 1 of 1
\092532.0\Project Management\PM Schedule\Extended Schedule.xls
EGMA 1100
Pennoni
MEMORANDUM
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Daniel Barbato, P.E. Authority Engineer |
| DATE: | March 10, 2011 |
| SUBJECT: | Engineer’s Report |
RCSTP Upgrade and Expansion
- Construction phase services continue with punchlist monitoring, final review of operations and maintenance submittals, troubleshooting, and coordination with the Project Manager and the Township.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation are working on punchlist completion. A punchlist update for both contractors was distributed for review on March 9. Remaining punchlist items are minor with the exception of Operations and Maintenance Manual submittals from Clinger, and Clinger’s Arc Flash/Short Circuit Study.
- O&M submittals from Worth are complete.
- Pennoni has completed the application paperwork for the renewal of the discharge permit, which expires in September. Letters of intent for the renewal (Act 14) will be filed to the required parties (Chester County Heath Dept., Chester County Planning Commission and East Goshen Board of Supervisors) followed by submittal of the paperwork to DEP in the next week.
I/I Metering Project
- The Township continues to meter flows at selected locations. Meters are in operation in at new locations as recommended, and we will review meter data as it is submitted. Data has been received through January.
Ridley Creek Consent Order
- The next report is due to DEP in March of 2011. The March report is in progress and we expect to be ready to submit to DEP before the end of the month.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2011\Memo to EGMA Board 2011-03-10.docx
EGMA 1100
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- Response to DEP comments and revised reports were submitted to DEP in February, prior to the deadline. We received a few informal questions and are addressing these. No formal comments have been received yet from DEP on the revised reports.
Marydell PS Elimination Planning
- The draft report for the Act 537 Plan Revision was submitted to the Township for review on March 9. Following the Authority’s review, we will make the required Component 4 submissions to the East Goshen Planning Commission, West Goshen Planning Commission, Chester County Planning Commission, and Chester County Health Department.
Chapter 94 Report
- The annual updates to the Chapter 94 report are in progress. We will schedule a meeting with the Township to review developments and changes over the past year, and gather data needed to complete the report.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2011\Memo to EGMA Board 2011-03-10.docx
Brickhouse Environmental
Consultants and Engineers
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
| Invoice number | 5815 |
|---|---|
| Date | 3/1/2011 |
| Client ID: 548 |
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of February 2011.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 58.00 | 6,670.00 |
| Labor Total | 58.00 | 6,670.00 |
| Reimbursable | Amount |
|---|---|
| 0.00 | |
| Expense Total | 0.00 |
| Invoice Total | 6,670.00 |
[Handwritten: Approved 3/9/2011 [Signature]]
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
When Creativity & Experience Count
www.brickhouse-environmental.com
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 465223 |
|---|---|
| Invoice Date : | 03/02/2011 |
| Project : | EGMA0707 |
| Project Name : | RCSTP Expansion |
For Services Rendered through: 02/13/2011
Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist progress review; site observation and consultation with Township regarding same. Meetings to discuss punchlists with contractors, troubleshooting and operations review, and project closeout activities. Investigation, documentation, meetings and support related to Electrical Contractor claims.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Permit Design | est. $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. $206,320.00 | $199,986.17 | $203,113.17 | $3,127.00 | |
| Total : | $729,320.00 | $722,851.97 | $725,978.97 | $3,127.00 |
Phase : 50 -- EC Response
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Principal Engineer | 1.00 | 115.00 | 115.00 |
| Senior Engineer | 10.50 | 105.00 | 1,102.50 |
| Project Engineer | 1.75 | 90.00 | 157.50 |
| Authority Engineer | 9.75 | 110.00 | 1,072.50 |
| Technical Specialist | 15.50 | 75.00 | 1,162.50 |
| Labor Total: | 38.50 | $3,610.00 | |
| Phase Subtotal | $3,610.00 |
[Handwritten: Approved 3/9/11 [Signature]]
| Amount Due This Invoice | $6,737.00 |
|---|
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls
Invoice Date 03-02-2011
| Project: | RCSTP Expansion and Upgrade | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA0707 | ||
| Invoice No: | 465223 | ||
| Invoice Period: | 1/17/2010 | to | 2/13/2011 |
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Changes: | $ 11,500.00 | Date: | 6/14/2010 |
| Changes: | $ 40,400.00 | Date: | 8/5/2010 |
| Changes: | $ 18,720.00 | Date: | 10/11/2010 |
| Changes: | $ 14,000.00 | Date: | 1/10/2011 |
| Contract Amount: | $ 729,320.00 | ||
| Previously Invoiced: | $ 722,851.97 | ||
| Current Invoice: | $ 3,127.00 | ||
| Invoiced to Date ($): | $ 725,978.97 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 3,341.03 | ||
| Remaining Budget (%): | 0.46% |
* Note: Calculations do not include Phase 50, which is billed on a time and material basis.
Budget by Phase:
Phase No. 10
Phase Name: Continued Eng Svcs
| Phase Budget: | $ 99,700.00 |
|---|---|
| Changes: | $ 33,500.00 |
| Changes: | $ 40,400.00 |
| Changes: | $ 18,720.00 |
| Changes: | $ 14,000.00 |
| Contract Amount: | $ 206,320.00 |
| Previously Invoiced: | $ 199,986.17 |
| Current Invoice: | $ 3,127.00 |
| Invoiced to Date ($): | $ 203,113.17 |
| Invoiced to Date (%): | 98% |
| Remaining Budget ($): | $ 3,206.83 |
| Remaining Budget (%): | 3% |
Comments: Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist progress review; site observation and consultation with Township regarding same. Meetings to discuss punchlists with contractors, troubleshooting and operations review, and project closeout activities. Investigation, documentation, meetings and support related to Electrical Contractor claims.
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 223.25 | 7.50 | 230.75 |
| Senior Engineer | 430.50 | 8.50 | 439.00 |
| Senior Designer | 221.00 | 1.00 | 222.00 |
| Project Engineer | 164.50 | 0.00 | 164.50 |
| Staff Engineer | 13.50 | 0.00 | 13.50 |
| Associate Engineer | 77.50 | 7.00 | 84.50 |
| Graduate Engineer | 43.75 | 0.00 | 43.75 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 1121.75 | 10.00 | 1131.75 |
| Engineering Technician I | 57.25 | 0.00 | 57.25 |
| Administrative Assistant I | 1.50 | 0.00 | 1.50 |
| Totals | 2357.00 | 34.00 | 2391.00 |
RC Expan. Expense
The UPS Store #753, 1554 Paoli Pike, West Chester, PA 19380-6102, (610) 692-6076
02/28/11 03:14 PM
We are the one stop for all your shipping, postal and business needs.
TRACKING: Call 1.800.742.5877 or on the web at www.theupsstore.com
| Item | Amount |
|---|---|
| 001 001040 (001) Ground Commercial Tracking# 1ZE195574241996169 | TO $ 32.94 |
| SubTotal | $ 32.94 |
| Total | $ 32.94 |
| House Account EAST GOSHEN TOWNSHIP DEBBIE BEURY | $ 32.94 |
Thank You DEBBIE BEURY
Receipt ID 82847938756211888998 001 Items | CSH: Ronald | Tran: 8266 Reg: 002
Thank you for visiting your neighborhood Copy and Print Center.
Whatever your business and personal needs, we are here to serve you.
ENTER FOR A CHANCE TO WIN $1000
We value your feedback. To enter please complete the customer satisfaction survey located at: www.theupsstore.com/survey
For official rules and Terms and Conditions go to www.theupsstore.com and click on the Customer Experience Survey link
Shipment Receipt: Page #1 of 1
THIS IS NOT A SHIPPING LABEL. PLEASE SAVE FOR YOUR RECORDS.
SHIP DATE: Mon, Feb 28, 2011
EXPECTED DELIVERY DATE: THUR, MAR 3, 2011 EOD
SHIP FROM: EAST GOSHEN TOWNSHIP, MARK MILLER, 1580 PAOLI PIKE, West Chester PA 19380, (610) 692-7171
SHIP TO: HACH SERVICE CENTER, # 434674, 100 DAYTON AVE, AMES IA 50010-6402, Business
SHIPPED THROUGH: THE UPS STORE #0753, West Chester, PA 19380, (610) 692-6076
SHIPMENT INFORMATION: UPS Ground Commercial, 5.05 lbs actual wt, 6.00 lbs billable wt, Dims: 16.00x10.00x7.00, Declared Value = $1,000.00, Sig Req (w/Delv Confirm), E-mail Notification: Ship
Tracking Number: 1ZE195574241996169 | Shipment ID: MM5EBTR9WJ01P | Order/Item #: none | Ref#: none
DESCRIPTION OF GOODS: PROBE
SHIPMENT CHARGES:
| Charge | Amount |
|---|---|
| Ground Commercial | $11.03 |
| Service Options | $21.05 |
| Fuel Surcharge | $0.66 |
| CMS Processing Fee | $0.20 |
| Total | $32.94 |
COMPLETE ONLINE TRACKING: Enter either of these addresses in your web browser to track: http://theupsstore.com (select Tracking, enter Shipment ID #) http://mbe.com (select Tracking, enter Shipment ID #)
SHIPMENT QUESTIONS? Contact SHIPPED THROUGH above.
PRINT YOUR PROJECTS HERE!
A broad range of professional printing services. BROCHURES, BUSINESS CARDS, LETTERHEAD, FLYERS AND MORE.
Shipment ID: MM5EBTR9WJ01P
Powered by iShip(tm) 02/28/2011 12:33 PM Pacific Time
ups SEE NOTICE ON REVERSE regarding UPS Terms, and notice of limitation of liability. Where allowed by law, shipper authorizes UPS to act as forwarding agent for export control and customs purposes. If exported from the US, shipper certifies that the commodities, technology or software were exported from the US in accordance with the Export Administration Regulations. Diversion contrary to law is prohibited.
D.O. Probe Sent for repair
Approve MJM 3/9/11
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
02/28/2011
Client No: 6604-08M
Invoice No. 87034
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Ridley Creek Treatment Plant - Arbitrations
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 02/01/2011 SRM |
Receipt and review correspondence from R Smith regarding settlement. | 0.20 | 35.00 |
| 02/02/2011 SRM |
Review correspondence from client regarding status. | 0.20 | 35.00 |
| 02/03/2011 SRM SRM |
Telephone conference with client regarding settlement. Respond to auditor's requests. |
0.20 0.20 |
35.00 35.00 |
| 02/15/2011 RFA SRM SRM |
Conference with S McDonnell regarding Pennoni cooperation in mediation with Clinger Corp.; telephone conference with Rick Smith regarding use of Evan Andrews in defense of Clinger claim. Review correspondence from R Smith regarding status. Conference with R Adams regarding status. |
0.70 0.20 0.30 |
122.50 35.00 52.50 |
| 02/17/2011 SRM |
Telephone conference with R Cohen regarding offer. | 0.20 | 35.00 |
| For Current Services Rendered | 2.20 | 385.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 0.70 | $175.00 | $122.50 |
| Stephen R. McDonnell | 1.50 | 175.00 | 262.50 |
| Previous Balance | $2,592.50 |
|---|---|
| Total Current Charges | 385.00 |
| 02/16/2011 Fee Payment | -1,872.50 |
[Handwritten: ok RS]
Page: 2
02/28/2011
Client No: 6604-08M
Invoice No. 87034
East Goshen Municipal Authority
Ridley Creek Treatment Plant - Arbitrations
| 02/17/2011 | Fee Payment | -720.00 |
|---|---|---|
| Total Payments | -2,592.50 | |
| Balance Due | $385.00 | |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 465221 |
|---|---|
| Invoice Date : | 03/02/2011 |
| Project : | EGMA0703 |
| Project Name : | LCSTP Decommissioning Planning |
For Services Rendered through: 02/13/2011
Finalize reports and prepare for DEP submission.
| Phase : 01 -- DEP Coordination | |
|---|---|
| Total Phase : 01 -- DEP Coordination | |
| Labor : | 1,041.25 |
| Expense : | 0.00 |
| Phase Total : | 1,041.25 |
| Phase : 02 -- Act 537 Plan Update | |
| Total Phase : 02 -- Act 537 Plan Update | |
| Labor : | 1,721.25 |
| Expense : | 0.00 |
| Phase Total : | 1,721.25 |
| Amount Due This Invoice | $2,762.50 |
| Fee : | 29,700.00 |
|---|---|
| Prior Billings : | 26,933.50 |
| Current Billings : | 2,762.50 |
| Total Billings : | 29,696.00 |
[Handwritten: Approved 3/9/2011 [Signature]]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA0703 -- LCSTP Decommissioning Planning
Invoice # : 465221
...Continued from previous page
Phase : 01 -- DEP Coordination
| Labor Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Staff Engineer | 12.25 | 85.00 | 1,041.25 |
| Labor Total: | 12.25 | 1,041.25 |
| Total Phase : 01 -- DEP Coordination | Labor : | ,041.25 |
|---|---|---|
| Expense : | bash.00 |
Phase : 02 -- Act 537 Plan Update
| Labor Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 105.00 | 78.75 |
| Project Engineer | 18.25 | 90.00 | 1,642.50 |
| Labor Total: | 19.00 | 1,721.25 |
| Total Phase : 02 -- Act 537 Plan Update | Labor : | ,721.25 |
|---|---|---|
| Expense : | bash.00 |
| Total Project : EGMA0703 -- LCSTP Decommissioning Planning | Labor : | ,762.50 |
|---|---|---|
| Expense : | bash.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMA0703 Invoice Summary.xls
Invoice Date 3-2-2011
| Project: | LCSTP Decommissioning Planning | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA0703 | ||
| Invoice No: | 465221 | ||
| Invoice Period: | 1/17/2011 | to | 2/13/2011 |
| Initial Authorization: | $ 23,700.00 | Date: | 5/14/2007 |
| Changes: | $ 6,000.00 | Date: | 12/14/2009 |
| Contract Amount: | $ 29,700.00 | ||
| Previously Invoiced: | $ 26,933.50 | ||
| Current Invoice: | $ 2,762.50 | ||
| Invoiced to Date ($): | $ 29,696.00 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 4.00 | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase No. | 01 | 02 | 10 |
|---|---|---|---|
| Phase Name: | DEP Coordination | Act 537 Plan Update | Survey of Diversion Sewer |
| Phase Budget: | $ 3,700.00 | $ 20,000.00 | $ 6,000.00 |
| Previously Invoiced: | $ 2,610.00 | $ 18,323.50 | $ 5,735.00 |
| Current Invoice: | $ 1,041.25 | $ 1,721.25 | $ 265.00 |
| Invoiced to Date ($): | $ 3,651.25 | $ 20,044.75 | $ 6,000.00 |
| Invoiced to Date (%): | 99% | 100% | 100% |
| Remaining Budget ($): | $ 48.75 | $ (44.75) | $ - |
| Remaining Budget (%): | 1% | 0% | 0% |
Comments: Finalize reports and prepare for DEP submission.
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 465229 Invoice Date : 03/02/2011 Project : EGMA0704 Project Name : Pump Station Special Study |
|---|
For Services Rendered through: 01/23/2011
Finalize reports and prepare for DEP submission.
Phase : 01 -- Planning Study
| Total Phase : 01 -- Planning Study | Labor : | 1,491.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,491.25 |
| Amount Due This Invoice | ,491.25 |
|---|
| Fee : | 28,500.00 |
|---|---|
| Prior Billings : | 26,990.00 |
| Current Billings : | 1,491.25 |
| Total Billings : | 28,481.25 |
Phase : 01 -- Planning Study
| Labor Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.75 | 105.00 | 183.75 |
| Project Engineer | 3.25 | 90.00 | 292.50 |
| Staff Engineer | 11.00 | 85.00 | 935.00 |
| Associate Engineer | 1.00 | 80.00 | 80.00 |
| Labor Total: | 17.00 | 1,491.25 |
| Total Phase : 01 -- Planning Study | Labor : | ,491.25 |
|---|---|---|
| Expense : | bash.00 |
| Total Project : EGMA0704 -- Pump Station Special Study | Labor : | ,491.25 |
|---|---|---|
| Expense : | bash.00 |
[Handwritten note: ok TES]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0704 Invoice Summary.xls
Invoice Date 03-02-2011
| Project: | Hershey Mill and Reserve Pump Station Diversion Special Planning Study | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA0704 | ||
| Invoice No: | 465229 | ||
| Invoice Period: | 1/17/2011 | to | 2/13/2011 |
| Initial Authorization: | $ 14,000.00 | Date: | 7/9/2007 |
| Changes: | $ 14,500.00 | Date: | 12/14/2009 |
| Contract Amount: | $ 28,500.00 | ||
| Previously Invoiced: | $ 26,990.00 | ||
| Current Invoice: | $ 1,491.25 | ||
| Invoiced to Date ($): | $ 28,481.25 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 18.75 | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase No. | 01 | 02 | 10 |
|---|---|---|---|
| Phase Name: | Act 537 Special Study | Meetings Allowance | Survey of Diversion Sewer |
| Phase Budget: | $ 12,500.00 | $ 1,500.00 | $ 14,500.00 |
| Previously Invoiced: | $ 12,496.00 | $ - | $ 14,349.00 |
| Current Invoice: | $ 1,491.25 | $ - | $ 145.00 |
| Invoiced to Date ($): | $ 13,987.25 | $ - | $ 14,494.00 |
| Invoiced to Date (%): | 112% | 0% | 100% |
| Remaining Budget ($): | $ (1,487.25) | $ 1,500.00 | $ 6.00 |
| Remaining Budget (%): | -12% | 100% | 0% |
Comments: Finalize reports and prepare for DEP submission.
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 465288 Invoice Date : 03/02/2011 Project : EGMA1100 Project Name : 2011 Annual Services |
|---|
For Services Rendered through: 02/13/2011
Preparation of monthly report, began forms for RCSTP NPDES permit renewal, prepare Act 14 letters.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,970.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,970.00 |
| Amount Due This Invoice | ,970.00 |
|---|
| Fee : | 10,000.00 |
|---|---|
| Prior Billings : | 787.50 |
| Current Billings : | 1,970.00 |
| Total Billings : | 2,757.50 |
Phase : **** -- Professional Services
| Labor Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.00 | 110.00 | 440.00 |
| Project Engineer | 17.00 | 90.00 | 1,530.00 |
| Labor Total: | 21.00 | 1,970.00 |
| Total Phase : **** -- Professional Services | Labor : | ,970.00 |
|---|---|---|
| Expense : | bash.00 |
| Total Project : EGMA1100 -- 2011 Annual Services | Labor : | ,970.00 |
|---|---|---|
| Expense : | bash.00 |
[Handwritten note: Approved [Signature] 3/9/2011]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1100 Invoice Summary.xlsx
Invoice Date 03-02-2011
| Project: | 2011 Annual Services | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1100 | ||
| Invoice No: | 465288 | ||
| Invoice Period: | 1/17/2011 | to | 2/13/2011 |
| Initial Authorization: | $ 10,000.00 | Date: | 12/13/2010 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 787.50 | ||
| Current Invoice: | $ 1,970.00 | ||
| Invoiced to Date ($): | $ 2,757.50 | ||
| Invoiced to Date (%): | 28% | ||
| Remaining Budget ($): | $ 7,242.50 | ||
| Remaining Budget (%): | 72% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2011 Annual Services |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 787.50 |
| Current Invoice: | $ 1,970.00 |
| Invoiced to Date ($): | $ 2,757.50 |
| Invoiced to Date (%): | 28% |
| Remaining Budget ($): | $ 7,242.50 |
| Remaining Budget (%): | 72% |
Comments: Preparation of monthly report, began forms for RCSTP NPDES renewal, prepare Act 14 letters.
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 465289 Invoice Date : 03/02/2011 Project : EGMA1101 Project Name : 2011 Chapter 94 Reporting |
|---|
For Services Rendered through: 02/13/2011
Begin preparation of Chapter 94 reports beginning with Ridley Creek.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,542.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,542.50 |
| Amount Due This Invoice | ,542.50 |
|---|
| Fee : | 10,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 1,542.50 |
| Total Billings : | 1,542.50 |
Phase : **** -- Professional Services
| Labor Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.75 | 110.00 | 192.50 |
| Project Engineer | 15.00 | 90.00 | 1,350.00 |
| Labor Total: | 16.75 | 1,542.50 |
| Total Phase : **** -- Professional Services | Labor : | ,542.50 |
|---|---|---|
| Expense : | bash.00 |
| Total Project : EGMA1101 -- 2011 Chapter 94 Reporting | Labor : | ,542.50 |
|---|---|---|
| Expense : | bash.00 |
[Handwritten note: Approved [Signature] 3/9/11]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1101 Invoice Summary.xlsx
Invoice Date 1-28-2011
| Project: | 2011 Chapter 94 Reporting | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1101 | ||
| Invoice No: | 465289 | ||
| Invoice Period: | 1/17/2011 | to | 2/13/2011 |
| Initial Authorization: | $ 10,000.00 | Date: | 12/13/2010 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 1,542.50 | ||
| Invoiced to Date ($): | $ 1,542.50 | ||
| Invoiced to Date (%): | 15% | ||
| Remaining Budget ($): | $ 8,457.50 | ||
| Remaining Budget (%): | 85% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2011 Chapter 94 Reporting |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,542.50 |
| Invoiced to Date ($): | $ 1,542.50 |
| Invoiced to Date (%): | 15% |
| Remaining Budget ($): | $ 8,457.50 |
| Remaining Budget (%): | 85% |
Comments: Begin preparation of Chapter 94 reports beginning with Ridley Creek.
[Pennoni Logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 465228 Invoice Date : 03/02/2011 Project : EGMA1102 Project Name : 2011 COA Reports |
|---|
For Services Rendered through: 02/13/2011
Import meter & precipitation data through December.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 535.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 535.00 |
| Amount Due This Invoice | 35.00 |
|---|
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 535.00 |
| Total Billings : | 535.00 |
Phase : **** -- Professional Services
| Labor Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 1.50 | 90.00 | 135.00 |
| Associate Engineer | 5.00 | 80.00 | 400.00 |
| Labor Total: | 6.50 | 535.00 |
| Total Phase : **** -- Professional Services | Labor : | 35.00 |
|---|---|---|
| Expense : | bash.00 |
| Total Project : EGMA1102 -- 2011 COA Reports | Labor : | 35.00 |
|---|---|---|
| Expense : | bash.00 |
[Handwritten note: Approved [Signature] 3/9/11]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1102 Invoice Summary.xlsx
Invoice Date 1-28-2011
| Project: | 2011 COA Reports | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1102 | ||
| Invoice No: | 465228 | ||
| Invoice Period: | 1/17/2011 | to | 2/13/2011 |
| Initial Authorization: | $ 11,000.00 | Date: | 12/13/2010 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 535.00 | ||
| Invoiced to Date ($): | $ 535.00 | ||
| Invoiced to Date (%): | 5% | ||
| Remaining Budget ($): | $ 10,465.00 | ||
| Remaining Budget (%): | 95% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2011 COA Reports |
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 535.00 |
| Invoiced to Date ($): | $ 535.00 |
| Invoiced to Date (%): | 5% |
| Remaining Budget ($): | $ 10,465.00 |
| Remaining Budget (%): | 95% |
Comments: Import meter & precipitation data through December.
[Logo: Gawthrop Greenwood, PC Attorneys at Law]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
02/28/2011
Client No: 6604-01M
Invoice No. 87032
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 02/04/2011 RFA |
Draft opinion to Authority auditors regarding pending litigation. | 1.00 | |
| 02/14/2011 RFA |
Review packet for meeting of Authority 2/14/11; attend regular meeting of Municipal Authority. | 3.00 | |
| For Current Services Rendered | 4.00 | 760.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 4.00 | 90.00 | 60.00 |
| Previous Balance | 31.00 |
|---|---|
| Total Current Charges | 760.00 |
| 02/16/2011 Fee Payment | -931.00 |
| Balance Due | 60.00 |
[Handwritten note: ok TES]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
2011
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
MARCH REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/9/11 - Joe - Completed; Need by 5/11/11 - Fran; Need by 8/10/11 - Jack; Need by 11/9/11 -Dana; February 2012 - Kevin
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Jack; 2 nd Quarter (June) Fran; 3 rd Quarter (September) Dana; 4 th Quarter (December) Joe
- Respond to capacity requests in 45 days or less.
- Implement I & I Plan
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction.
- Invite Board of Supervisors and all other ABC members to tour the plant.
- Open House at the RCSTP
- Have Siemens conduct a training session for Miller and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project.
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2011\031411.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
March 9, 2011
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Ref. | February Monthly Operations Report |
Meters: The meters were read on a daily basis. No adjustments were needed. The portable meters were read on a biweekly basis and data was sent to Pennoni. We had to move the meter at Ridley in order to get precise data.
C.C.Collection: The pumping stations were visited on a daily basis and bar screens were cleaned. The Muffin Monster at the Ash Bridge pumping station needs to be pulled and repaired.
We were notified of three sewer lateral blockages during the month at two of the blockages, we found cleanout pipes pulled out of the tee’s.
Loch wood Plant: I contacted the DEP regarding the drilling of two monitor wells. I explained that there is no way we can drill the wells until the ground dries out. The gentlemen that I spoke with was in agreement. I was told that the well drilling can wait until the ground can support the drilling rig without destroying the fields.
Ridley Creek Plant We averted a major sewage spill. The valve on the EQ Tank split. Fortunately it happened at 7:30 in the morning and was noticed by the operator. Within 15 minutes our crew was on site with three 4 inch pumps and was able to transfer the sludge to the two VCO tanks. PA Aqua was notified. Once they arrived we had them pull two loads out. The tank has been completely cleaned and a new valve has been installed.
Alarms: We responded to 18 alarms during the month of February.
Pa. One Calls: The Public Works Dept. responded to 45 PA One calls.
2008 FLOWMETERS
2011 FEBRUARY 1ST QUARTER
| Precip Inches |
DATE | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | NET | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | GPD | FLOWS | ||
| 0.20 | 02/01/11 | 20,400 | - | ||||||||
| 1.00 | 02/02/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/03/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/04/11 | 1,953,762 | 1,346,750 | 17,201,257 | 140,173 | 9,224,165 | 58,268 | 10,925,334 | 76,695 | 20,400 | 1,071,615 |
| 0.24 | 02/05/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/06/11 | 20,400 | 0 | ||||||||
| 0.10 | 02/07/11 | 1,957,721 | 1,319,667 | 17,246,215 | 149,860 | 9,243,994 | 66,097 | 10,942,581 | 57,490 | 20,400 | 1,046,220 |
| 0.00 | 02/08/11 | 1,959,129 | 1,408,000 | 17,262,907 | 166,920 | 9,251,947 | 79,530 | 10,950,624 | 80,430 | 20,400 | 1,081,120 |
| 0.00 | 02/09/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/10/11 | 1,961,777 | 1,324,000 | 17,292,254 | 146,735 | 9,263,654 | 58,535 | 10,966,251 | 78,135 | 20,400 | 1,040,595 |
| 0.00 | 02/11/11 | 1,963,075 | 1,298,000 | 17,305,742 | 134,880 | 9,268,817 | 51,630 | 10,973,662 | 74,110 | 20,400 | 1,037,380 |
| 0.00 | 02/12/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/13/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/14/11 | 1,966,733 | 1,219,333 | 17,345,410 | 132,227 | 9,285,567 | 55,833 | 10,990,611 | 56,497 | 20,400 | 974,777 |
| 0.00 | 02/15/11 | 1,968,098 | 1,365,000 | 17,361,459 | 160,490 | 9,292,385 | 68,180 | 10,999,536 | 89,250 | 20,400 | 1,047,080 |
| 0.00 | 02/16/11 | 1,969,377 | 1,279,000 | 17,375,880 | 144,210 | 9,298,121 | 57,360 | 11,007,226 | 76,900 | 20,400 | 1,000,530 |
| 0.00 | 02/17/11 | 1,970,631 | 1,254,000 | 17,389,990 | 141,100 | 9,304,554 | 64,330 | 11,014,663 | 74,370 | 20,400 | 974,200 |
| 0.00 | 02/18/11 | 1,972,035 | 1,404,000 | 17,406,614 | 166,240 | 9,310,834 | 62,800 | 11,022,053 | 73,900 | 20,400 | 1,101,060 |
| 0.00 | 02/19/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/20/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/21/11 | 20,400 | 0 | ||||||||
| 0.45 | 02/22/11 | 20,400 | 0 | ||||||||
| 0.00 | 02/23/11 | 1,978,553 | 1,303,600 | 17,480,031 | 146,834 | 9,342,522 | 63,376 | 11,050,771 | 57,436 | 20,400 | 1,035,954 |
| 0.65 | 02/24/11 | 1,979,749 | 1,196,000 | 17,494,766 | 147,350 | 9,348,529 | 60,070 | 11,058,047 | 72,760 | 20,400 | 915,820 |
| 0.35 | 02/25/11 | 1,981,166 | 1,417,000 | 17,508,752 | 139,860 | 9,355,803 | 72,740 | 11,066,125 | 80,780 | 20,400 | 1,123,620 |
| 0.00 | 02/26/11 | 20,400 | 0 | ||||||||
| 0.36 | 02/27/11 | 20,400 | 0 | ||||||||
| 0.27 | 02/28/11 | 1,984,052 | 962,000 | 17,560,926 | 173,913 | 9,376,090 | 67,623 | 11,082,164 | 53,463 | 20,400 | 734,623 |
| 3.62 | 1,292,596 | 149,342 | 63,312 | 71,587 | 1,013,185 | ||||||
| DAILY LOC | INQUIRER | EG TWP | |
|---|---|---|---|
| MONTH TO DATE | 3.62 | ||
| NORMAL MONTH TO DATE | |||
| YEAR TO DATE | 8 | ||
| NORMAL YEAR TO DATE |
2011 flowmeters -all-stations separate month worksheets.xls
3/2/2011 10:03 AM
2008 FLOWMETERS
2011 1st. Quarter February
| DATE | HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | SHERMAN | BARKWAY | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | READING | READING | READING | GPD | READING | GPD | READING | GPD | ||||
| 02/01/11 | ||||||||||||
| 02/02/11 | ||||||||||||
| 02/03/11 | ||||||||||||
| 02/04/11 | 20,325,046 | 63,845 | 1,015,650 | 79,825 | 17,296,669 | 358,270 | 114,829,715 | 859,443 | 507,043 | 8,493 | 1,822,860 | 12,450 |
| 02/05/11 | ||||||||||||
| 02/06/11 | ||||||||||||
| 02/07/11 | 20,344,466 | 64,733 | 1,018,205 | 85,167 | 17,378,955 | 274,287 | 115,078,805 | 830,300 | 509,003 | 6,533 | 1,826,602 | 12,473 |
| 02/08/11 | 20,350,697 | 62,310 | 1,019,115 | 91,000 | 17,416,509 | 375,540 | 115,171,196 | 923,910 | 509,593 | 5,900 | 1,827,773 | 11,710 |
| 02/09/11 | ||||||||||||
| 02/10/11 | 20,363,199 | 62,510 | 1,020,829 | 85,700 | 17,485,576 | 345,335 | 115,344,544 | 866,740 | 510,708 | 5,575 | 1,829,839 | 10,330 |
| 02/11/11 | 20,369,481 | 62,820 | 1,021,551 | 72,200 | 17,519,064 | 334,880 | 115,426,465 | 819,210 | 511,443 | 7,350 | 1,830,888 | 10,490 |
| 02/12/11 | ||||||||||||
| 02/13/11 | ||||||||||||
| 02/14/11 | 20,387,384 | 59,677 | 1,023,745 | 73,133 | 17,602,504 | 278,133 | 115,657,176 | 769,037 | 513,070 | 5,423 | 1,834,455 | 11,890 |
| 02/15/11 | 20,393,520 | 61,360 | 1,024,573 | 82,800 | 17,639,043 | 365,390 | 115,748,833 | 916,570 | 513,608 | 5,380 | 1,835,670 | 12,150 |
| 02/16/11 | 20,399,564 | 60,440 | 1,025,373 | 80,000 | 17,671,678 | 326,350 | 115,832,432 | 835,990 | 514,161 | 5,530 | 1,836,959 | 12,890 |
| 02/17/11 | 20,405,631 | 60,670 | 1,026,145 | 77,200 | 17,704,690 | 330,120 | 115,915,501 | 830,690 | 514,726 | 5,650 | 1,838,005 | 10,460 |
| 02/18/11 | 20,412,313 | 66,820 | 1,027,134 | 98,900 | 17,740,161 | 354,710 | 116,008,074 | 925,730 | 515,257 | 5,310 | 1,839,137 | 11,320 |
| 02/19/11 | ||||||||||||
| 02/20/11 | ||||||||||||
| 02/21/11 | ||||||||||||
| 02/22/11 | ||||||||||||
| 02/23/11 | 20,446,262 | 67,898 | 1,031,707 | 91,460 | 17,891,383 | 302,444 | 116,421,182 | 826,216 | 518,045 | 5,576 | 1,844,728 | 11,182 |
| 02/24/11 | 20,452,448 | 61,860 | 1,032,472 | 76,500 | 17,924,204 | 328,210 | 116,501,369 | 801,870 | 518,548 | 5,030 | 1,845,718 | 9,900 |
| 02/25/11 | 20,459,027 | 65,790 | 1,033,365 | 89,300 | 17,960,775 | 365,710 | 116,591,516 | 901,470 | 519,037 | 4,890 | 1,846,966 | 12,480 |
| 02/26/11 | ||||||||||||
| 02/27/11 | ||||||||||||
| 02/28/11 | 20,481,293 | 74,220 | 1,036,614 | 108,300 | 18,053,518 | 309,143 | 116,855,369 | 879,510 | 520,709 | 5,573 | 1,850,982 | 13,387 |
| 58,624 | 77,370 | 309,956 | 793,370 | 5,474 | 11,651 | |||||||
2011 flowmeters -all-stations separate month worksheets.xls
3/2/2011 10:03 AM
2011 SUMMARY OF METER READINGS
| Month | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,081,404 | 97,651 | 47,105 | 57,700 | 20,400 | 53,493 | 62,585 | 278,133 | 701,586 | 5,463 | 11,131 |
| FEBRUARY | 1,292,596 | 149,342 | 63,312 | 71,587 | 20,400 | 58,624 | 77,370 | 309,956 | 793,370 | 5,474 | 11,651 |
| MARCH | |||||||||||
| APRIL | |||||||||||
| MAY | |||||||||||
| JUNE | |||||||||||
| JULY | |||||||||||
| AUGUST | |||||||||||
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,187,000 | 123,497 | 55,209 | 64,644 | 20,400 | 56,059 | 69,978 | 294,045 | 747,478 | 5,469 | 11,391 |
| To West Goshen | 943,652 |
2011 flowmeters -all-stations separate month worksheets.xlsSUMMARY
February Precip. 3.62-2011
[Bar chart showing daily precipitation (snow/rain) for February 2011, with y-axis labeled "Precip." from 0 to 4 and x-axis labeled "snow/rain" from 1 to 34, and a cumulative total bar at 34 of approximately 3.62.]
Precip.: 0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5, 4
snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
Legend: February
Monthly Totals 2011 (Jan-Dec)
[3D bar chart showing Monthly Totals for 2011 (Jan-Dec), with y-axis labeled "Precip." from 0 to 4.5 and x-axis labeled "Month" from 1 to 4, with bars plotted for Month 1 (~4.5) and Month 2 (~3.62).]
Precip.: 0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5, 4, 4.5
Month: 1, 2, 3, 4
Legend: Monthly Totals
Flowmeters February 2011
[Line chart showing flowmeter readings for February 2011 by day of the month, with y-axis labeled "Flow's" from 0 to 1200000 and x-axis labeled "Day of the Month" from 1 to 30.]
Flow's: 0, 200000, 400000, 600000, 800000, 1000000, 1200000
Day of the Month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
Legend: February
Monthly Totals 2010 Jan-Dec
[Bar chart showing daily flowmeter readings grouped by month from January to December, with y-axis labeled "Flowmeters" from 0 to 1200000 and x-axis labeled "Month", showing bars for January and February.]
Flowmeters: 0, 200000, 400000, 600000, 800000, 1000000, 1200000
Month: January, February, March, April, May, June, July, August, September, October, November, December
MILLER ENVIRONMENTAL, INC.
The Water and Wastewater Authority®
10 March 2011
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Attn: Mr. Rick Smith, Township Manager
Re: Monthly Operations Report- March 2011
Dear Mr. Smith:
For the month of February, we have the following operations activity to report:
Ridley.
- Fine screen is still in hand.
- No. 2 (# 2) Digester was jetted, but still not reading accurately.
- Modifications at the centrifuge would make polymer replacement more efficient.
- Generators still alarming on Wednesdays.
- ACS and Alfa Laval training was conducted.
- Alum Pumps still need to be fixed; the Nocardia control is on hold.
Lochwood.
- Wells were sampled and charts were developed for future events.
- A check valve needs to be installed.
- Spraying began in March.
- e-DMR registration completed; January was hard copy, Feb will be electronic.
- Several cracked rainbirds.
- Several initial odor complaints.
Thank you,
MILLER ENVIRONMENTAL INC.
William Ronyack
Operations Manager
(SENT VIA EMAIL)
CC: Mark Miller, Director of Public Works
Scott Stump, MEI
320 S. 17TH STREET • READING, PA 19602 • (P) 610.376.9162 • (F) 610.376.9164
Rick Smith
| From: | Barbato, Daniel [DBarbato@Pennoni.com] |
|---|---|
| Sent: | Thursday, March 03, 2011 12:46 PM |
| To: | rsmith@eastgoshen.org; Sue Smith |
| Subject: | Change of Address |
Rick,
My office address has changed. The new address is below:
Dan
Daniel P. Barbato, P.E.
Municipal Division Manager
Water/Wastewater Lead Engineer
Pennoni Associates Inc.
New Location & Phone
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713-4310
Office 302-655-4451 x5230 | Direct 302-351-5230
Fax 302-654-2895 | Mobile 302-379-8240
http://www.pennoni.com | dbarbato@pennoni.com
1
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 11, 2011
Re: Land Development Plan
Toll Brothers Development / Applebrooke Meadows
Paoli Pike and Line Road
Willistown Township
Dear Property Owner:
The purpose of this letter is to inform you that a Final Land Development Plan has been submitted to Willistown Township to construct Phase 1 of 3, for the Applebrook Meadows project. Phase I consists of 54 townhomes. The entire project proposes 139 townhomes on the 41.7-acre tract of land at the southeast corner of Paoli Pike and Line Road in Willistown Township. Pursuant to Township Policy, East Goshen Township notifies Township property owners within 1,000 feet of proposed development projects which abut the Township boundary.
The Williston Township Planning Commission holds their meetings at 7:30 PM on the 1st and 3rd Wednesday of each month. The Willistown Township Board of Supervisors holds their meetings at 7:30 P.M. on the 2nd And 4th Monday of the month.
All meetings are open to the public and they are held at the Willistown Township Office which is located at the Greentree Office Plaza, 40 Lloyd Ave., Suite 208, Malvern PA 19355, 610-647-5300.
Please give me a call at 610-692-7171 or e-mail me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[Signature: Mark Gordon]
Mark Gordon
Township Zoning Officer
Cc: Hugh Murray, Sr., Township Manager, Willistown twp.
F:\Data\Shared Data\Willistown\Bryn Mawr Rehab\Letter to EGT Residents 02072011 re Applebrooke Meadows.doc