Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
May 09, 2011
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Cost Summary Report; Change Orders – Worth & Company #5
- RIDLEY CREEK INVOICES a. Brickhouse Environmental #5928 $ 4,686.25 b. Pennoni, #470592 $ 5,560.80 c. Gawthrop Greenwood, PC #88002 $ 442.07 d. Ransome Rental Co. #K0404301 $ 423.00 e. Ransome Rental Co. #K0403101 $ 708.00 f. Fisher & Son #0000087217-IN $ 370.00 g. Lenni Electric Co. #110445 $ 1,184.69
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES April 11, 2011
- APPROVAL OF INVOICES a. Pennoni, #470606 $ 1,784.25 b. Pennoni, #470595 $ 3,305.00 c. Pennoni, #470596 $ 7,902.50 d. Pennoni. #470597 $ 3,725.00 e. Gawthrop Greenwood #88001 $ 513.00
- LIAISON REPORTS
- FINANCIAL REPORTS April Report
- OLD BUSINESS
- GOALS 2011 Goals
- NEW BUSINESS Resolution for the Municipal Authority; Pennoni – Proposal for Professional Services for Lockwood Chase STP; Pennoni – Sewage Facilities Planning Update Revision
- CAPACITY REQUESTS - None
- SEWER REPORTS Director of Public Works Report – April 2011 will be given next month; East Goshen Township Flows for 2010; Miller Environmental, Inc. Monthly Operations Report for April
F:\Data\Shared Data\Agendas\Municipal Authority\2011\5-09-2011 .doc
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST Letter from Rita Hartleroad; Letter from the House of Representatives; Letter to the Turner’s on 15 Fox Ridge Drive
- PUBLIC COMMENT
- ADJOURNMENT
- EXECUTIVE SESSION - LEGAL
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| May 11, 2011 – Fran | July 1, 2011 |
| August 10, 2011 – Jack | October 1, 2011 |
| November 9, 2011- Dana | January 1, 2011 |
F:\Data\Shared Data\Agendas\Municipal Authority\2011\5-09-2011 .doc
East Goshen Township Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade and Expansion Project
Project Manager’s April 2011 Report
Executive Summary
During the month of April, progress towards fulfilling the requirements for final close out of the RCSTP upgrade and expansion project was completed. A meeting was conducted on April 6, 2011 that included the contractors, engineer and representatives from the Authority to review progress and identify outstanding issues.
Several issues identified, including closeout and unscheduled warranty items, were resolved. A follow up meeting was conducted on May 4, 2011 to review progress towards project closeout and address operational issues with the treatment process. Representatives from Pennoni Associates, Inc., Miller Environmental Inc., Worth & Company, Inc. Wm. H. Clinger Corporation and the Municipal Authority were in attendance. An onsite review was conducted after the meeting. Letters detailing the remaining items required as specified in the contract documents for final closeout and warranty/punch list items were presented to each contractor.
The wastewater treatment operation and maintenance service provider continues to implement corrective measures to reduce the filamentous bacterium within the SBRs. The aluminum sulfate chemical feed system pumps and controls are in service to provide liquid sodium hypochlorite solution. In addition, the Municipal Authority has contracted with a sludge hauling company to remove and dispose of foam that has accumulated on the surface of the SBRs.
Paul Christiansen from Siemens has been confirmed to arrive at the treatment plant on Tuesday May 10th. He will be on site from May 10th through May 12th to provide training and technical support to the wastewater treatment plant operator.
The Pennsylvania Department of Environmental Protection Water Quality Specialist/Inspector routinely visits the facility and maintains communication with wastewater treatment operation and maintenance service provider. It is anticipated implementation of the new wastewater treatment permit discharge limitations will be delayed until August 2011.
The project remains substantially complete with final closeout pending.
Page 1 of 1
EGMA 1100
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- The Lockwood Chase report was approved by DEP on March 29.
- DEP is reviewing our response to their comments for the Hersheys Mill/Reserve report. We have not received additional formal comments from DEP.
- A proposal for design of the Lockwood Chase elimination project is submitted under separate cover.
Marydell PS Elimination Planning
- The draft report for the Act 537 Plan Revision was submitted to DEP in April. No comments have been received from DEP at the time of this report.
Applebrook Spray Irrigation NPDES Permit Renewal
- We are preparing the NPDES discharge permit and anticipate submittal to DEP in Mid-June.
Reservoir Road Pump Station
- Pennoni prepared a revised project cost estimate. The estimate is submitted under separate cover.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2011\Memo to EGMA Board 2011-05-05.docx
EGMA 1100
Pennoni
MEMORANDUM
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Daniel Barbato, P.E. Authority Engineer |
| DATE: | May 5, 2011 |
| SUBJECT: | Engineer’s Report |
RCSTP Upgrade and Expansion
- Construction phase services continue with punchlist monitoring, review of operations and maintenance submittals and as-built plans, progress meetings, troubleshooting, and coordination with the Project Manager and the Township.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation continue working on punchlist completion. A punchlist update for both contractors has been updated several times in the past month. Verification of completed items continues. Clarification was sent to the Project manager to Clinger regarding closeout requirements.
- A coordination meeting was held on Wednesday May 4 in the Township office. The meeting consisted of Pennoni, the Township, Clinger, Worth, ACS, and the Plant Operator. The purpose of the meeting was to review and discuss several operational issues that started in mid-April, and to determine resolutions to problems with pump control, odors, dissolved oxygen control and chemical feed systems. Pennoni will provide an opinion on the benefit of a whole-plant blowdown to restart the plant.
I/I Metering Project
- The Township continues to meter flows at selected locations. Meters are in operation in at locations as recommended. March meter data was reviewed and we provided comments to Mark Miller.
Ridley Creek Consent Order
- The report for March was submitted to DEP in advance of the deadline. We have not received comments from DEP at the time of this report.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2011\Memo to EGMA Board 2011-05-05.docx
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY
May 9, 2011
Includes bills paid at 4/11/11 meeting
| Name | Budget or Contract amt. | This Month | To Date | Balance on Budget or Contract | % of work completed |
|---|---|---|---|---|---|
| RECEIPTS | |||||
| Bond | $9,500,000.00 | $0.00 | $9,500,000.00 | ||
| Pennoni (rechargable) | $20,000.00 | $0.00 | $0.00 | ||
| Grant | $464,195.00 | $0.00 | $464,195.00 | ||
| RECEIPTS TOTAL | $9,984,195.00 | $0.00 | $9,964,195.00 | ||
| EXPENSES | |||||
| Borrowing costs | $52,250.00 | $0.00 | $52,250.00 | $0.00 | 100.00% |
| Worth | $7,865,400.00 | $125,000.00 | $7,770,336.12 | $95,063.88 | 98.79% |
| change orders | $18,932.66 | $0.00 | $0.00 | $18,932.66 | 0.00% |
| Clinger | $974,000.00 | $0.00 | $950,777.64 | $23,222.36 | 97.62% |
| change orders | $49,372.24 | $0.00 | $0.00 | $49,372.24 | 0.00% |
| Pennoni (Inspection) (05) | $136,200.00 | $0.00 | $136,197.62 | $2.38 | 100.00% |
| Pennoni (Continued Services) (10) | $206,320.00 | $3,127.00 | $203,413.17 | $2,906.83 | 98.59% |
| Pennoni (EC Response) (50) New | $9,990.00 | $3,610.00 | $9,990.00 | $0.00 | 100.00% |
| Pennoni (Rechargeable) (06) | $20,000.00 | $0.00 | $19,997.18 | $2.82 | 99.99% |
| Brickhouse | $175,000.00 | $11,241.25 | $217,509.00 | -$42,509.00 | 124.29% |
| Extras | |||||
| Capital | $384,534.10 | $417.94 | $138,901.26 | $245,632.84 | 36.12% |
| Capital (Identified but not paid) | $80,196.00 | $0.00 | $12,416.76 | $67,779.24 | 15.48% |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $0.00 | $11,825.18 | $174.82 | 98.54% |
| EXPENSES TOTAL | $9,984,195.00 | $143,396.19 | $9,523,613.93 | $460,581.07 | 95.39% |
We have identified $21,357 in potential extras not counting Clinger.
We have filed a claim for the damaged TVSS units (Clinger CO #5)
Retainage (10% until 50% of the project is done then it drops back to 5%)
| Worth | $99,058.22 | 1.25% |
|---|---|---|
| Clinger | $51,794.25 | 5% |
| Total | $150,852.47 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 050911.xls SUMMARY V2
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL
May 9, 2011
| Date | Amount | Subtotals | Name | Description | |
|---|---|---|---|---|---|
| Worth | 2/9/2009 | $561,150.00 | Worth & Company | Application #1 | |
| 3/9/2009 | $480,825.00 | Worth & Company | Application #2 | ||
| 4/9/2009 | $768,780.00 | Worth & Company | Application #3 | ||
| 5/8/2009 | $125,352.90 | Worth & Company | Application #4 | ||
| 5/31/2009 | $485,103.12 | Worth & Company | Application #5 | ||
| 6/30/2009 | $267,975.00 | Worth & Company | Application #6 | ||
| 7/31/2009 | $138,217.50 | Worth & Company | Application #7 | ||
| 8/31/2009 | $679,793.40 | Worth & Company | Application #8 | ||
| 9/30/2009 | $504,310.98 | Worth & Company | Application #9 | ||
| 9/30/2009 | $222,861.55 | Worth & Company | Application #10 (5% retainage) | ||
| 10/31/2009 | $724,089.05 | Worth & Company | Application #11 | ||
| 11/30/2009 | $379,360.17 | Worth & Company | Application # 12 | ||
| 12/31/2009 | $374,772.62 | Worth & Company | Application #13 | ||
| 1/31/2010 | $207,881.86 | Worth & Company | Application # 14 | ||
| 2/28/2010 | $69,077.35 | Worth & Company | Application # 15 | ||
| 3/31/2010 | $75,857.50 | Worth & Company | Application # 16 | ||
| 4/30/2010 | $170,263.75 | Worth & Company | Application # 17 | ||
| 5/31/2010 | $178,290.62 | Worth & Company | Application #18 | ||
| 6/30/2010 | $299,633.25 | Worth & Company | Application #19 | ||
| 7/30/2010 | $426,170.00 | Worth & Company | Application #20 | ||
| 8/31/2010 | $227,050.00 | Worth & Company | Application #21 | ||
| 9/30/2010 | $54,520.50 | Worth & Company | Application 22 | ||
| 10/31/2010 | $224,000.00 | Worth & Company | Application #23 | ||
| 11/30/2011 | $125,000.00 | Worth & Company | Application #24 | ||
| $7,770,336.12 | $7,770,336.12 | ||||
| Clinger | 4/9/2009 | $22,152.64 | Clinger | Application #1 | |
| 5/8/2009 | $15,714.77 | Clinger | Application #2 | ||
| 5/31/2009 | $77,973.43 | Clinger | Application #3 | ||
| 6/30/2009 | $12,567.46 | Clinger | Application #4 | ||
| 8/30/2009 | $10,855.98 | Clinger | Application #5 | ||
| 9/30/2009 | $111,255.75 | Clinger | Application #6 | ||
| 10/31/2009 | $59,344.83 | Clinger | Application #7 | ||
| 11/30/2009 | $145,354.05 | Clinger | Application # 8 | ||
| 12/31/2009 | $94,727.00 | Clinger | Application # 9 | ||
| 1/31/2010 | $139,092.94 | Clinger | Application #10 | ||
| 2/28/2010 | $58,514.64 | Clinger | Application #11 | ||
| 2/28/2010 | $41,530.78 | Clinger | Application #12 (5% retainage) | ||
| $13,575.79 | Clinger | Application #13 |
1
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 050911.xls
DETAIL
| Date | Amount | Subtotals | Name | Description | |
|---|---|---|---|---|---|
| 5/2/2010 | $34,539.38 | Clinger | Application # 14 | ||
| 6/30/2010 | $40,633.52 | Clinger | Application #15 | ||
| 8/1/2010 | $42,347.24 | Clinger | Application # 16 | ||
| 8/31/2010 | $30,597.44 | Clinger | Application #17 | ||
| $950,777.64 | $950,777.64 | ||||
| Pennoni Inspection 05 | ? | $712.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU ? | |
| 10/30/2008 | $943.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 10/19/08 | ||
| 12/5/2008 | $18,115.98 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 11/30/08 | ||
| 1/15/2009 | $12,929.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 12/28/08 | ||
| 2/5/2009 | $13,352.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | ||
| 3/19/2009 | $31,288.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | ||
| 4/8/2009 | $29,010.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | ||
| 5/6/2009 | $22,436.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | ||
| 6/26/2009 | $7,409.22 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 5/31/2009 | ||
| $136,197.62 | $136,197.62 | ||||
| Pennoni Continued Services 10 | 12/30/2010 | $16,482.50 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 12/31/10 | |
| 1/29/2010 | $24,224.58 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 1/17/10 | ||
| 2/23/2010 | $13,057.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 2/14/10 | ||
| 4/1/2010 | $19,543.40 | PENNONI ASSOCIATES INC. | |||
| 5/5/2010 | $18,810.50 | PENNONI ASSOCIATES INC. | Through 4/18/2010 | ||
| 5/25/2010 | $19,287.50 | PENNONI ASSOCIATES INC. | Through 5/16/2010 | ||
| 6/29/2010 | $17,901.25 | PENNONI ASSOCIATES INC. | Through 6/20/10 | ||
| 7/29/2010 | $17,302.63 | PENNONI ASSOCIATES INC. | Through 7/18/2010 | ||
| 8/26/2010 | $12,393.25 | PENNONI ASSOCIATES INC. | Through 8/15/2010 | ||
| 9/29/2001 | $12,521.81 | PENNONI ASSOCIATES INC. | through 9/19/2010 | ||
| 10/27/2010 | $12,326.15 | PENNONI ASSOCIATES INC. | Through 10/17/2010 | ||
| 11/23/2010 | $4,097.75 | PENNONI ASSOCIATES INC. | through 11/7/2010 | ||
| 12/22/2010 | $8,722.35 | PENNONI ASSOCIATES INC. | thur 12/12/10 | ||
| 2/3/2011 | $3,615.50 | PENNONI ASSOCIATES INC. | Thru 1/16/11 | ||
| 3/2/2011 | $3,127.00 | PENNONI ASSOCIATES INC. | Thru 2/13 | ||
| $203,413.17 | $203,413.17 | ||||
| Pennoni (EC Response) (50) | 2/3/2011 | $6,380.00 | PENNONI ASSOCIATES INC. | Thru 1/16/11 | |
| 3/2/2011 | $3,610.00 | PENNONI ASSOCIATES INC. | Thru 2/13/11 | ||
| $9,990.00 | $9,990.00 | ||||
| Pennoni Rechargeable 06 | 2/5/2009 | $2,840.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 |
2
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 050911.xls
DETAIL
3
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 3/19/2009 | $4,934.75 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $3,777.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $1,409.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| 6/26/2009 | $3,507.43 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ. SERV. THRU 5/31/09 | |
| 7/29/2009 | $3,528.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 7/19/09 | |
| $19,997.18 | $19,997.18 | |||
| Brickhouse | ||||
| 5/12/2009 | $2,127.50 | BRICKHOUSE | Apr-09 | |
| 6/1/2009 | $8,452.50 | BRICKHOUSE | May-09 | |
| 7/1/2009 | $7,791.25 | BRICKHOUSE | Jun-09 | |
| 8/3/2009 | $9,315.00 | BRICKHOUSE | Jul-09 | |
| 9/1/2009 | $7,762.50 | BRICKHOUSE | Aug-09 | |
| 10/1/2009 | $7,417.50 | BRICKHOUSE | Sep-09 | |
| 11/2/2009 | $7,072.50 | BRICKHOUSE | Oct-09 | |
| 12/1/2009 | $7,963.75 | BRICKHOUSE | Nov-09 | |
| 1/4/2010 | $7,762.50 | BRICKHOUSE | Dec-09 | |
| 2/1/2010 | $7,618.75 | BRICKHOUSE | Jan-10 | |
| 3/1/2010 | $7,417.50 | BRICKHOUSE | Feb-10||
| 4/1/2010 | $10,005.00 | BRICKHOUSE | Mar-10 | |
| 5/3/2010 | $11,931.25 | BRICKHOUSE | Apr-10 | |
| 6/1/2010 | $10,321.25 | BRICKHOUSE | May-10 | |
| 7/1/2010 | $11,845.00 | BRICKHOUSE | Jun-10 | |
| 8/2/2010 | $14,911.25 | BRICKHOUSE | Jul-10 | |
| 9/1/2010 | $14,087.50 | BRICKHOUSE | Aug-10 | |
| 10/1/2010 | $10,695.00 | BRICKHOUSE | Sep-10 | |
| 10/1/2010 | $6,785.00 | BRICKHOUSE | Clinger Matter | |
| 11/1/2010 | $8,826.25 | BRICKHOUSE | Oct-10 | |
| 11/1/2010 | $571.50 | BRICKHOUSE | Clinger Matter | |
| 12/1/2010 | $9,947.50 | BRICKHOUSE | Nov-11 | |
| 1/3/2011 | $15,640.00 | BRICKHOUSE | Dec-11 | |
| 2/1/2011 | $11,241.25 | BRICKHOUSE | Feb-11 | |
| 3/1/2011 | $6,670.00 | BRICKHOUSE | Mar-11 | |
| 4/1/2011 | $5,750.00 | BRICKHOUSE | Apr-11 | |
| $229,929.00 | $229,929.00 | |||
| Extras - Capital - Paid | ||||
| 12/22/2008 | $44.98 | EAST GOSHEN TOWNSHIP | REIMBURSE GEN.FUND FOR OFFICE DEPOT | |
| 12/31/2008 | $88.00 | FASTSIGNS | RED ON WHITE ALUM. SIGNS | |
| 1/12/2009 | $177.00 | FASTSIGNS | SIGNS - PLEASE AVOID TOWNE DR.... | |
| 12/1/2008 | $36.00 | GREAT VALLEY LOCKSHOP | KEYS FOR CONTRACTOR | |
| 12/8/2008 | $160.80 | GREAT VALLEY LOCKSHOP | PADLOCKS, REKEY CYLINDERS & KEYS | |
| 12/29/2008 | $474.82 | HANSON AGGREGATES INC | 36.95 TONS SUBBASE AGGREGATE | |
| 12/31/2008 | $908.00 | HANSON AGGREGATES INC | 70.66 TONS SUBGRADE 2 AGGREGATE | |
| 12/15/2008 | $2,089.39 | LENNI ELECTRIC CORPORATI | TEMP SERV. FOR TRAILER - RIDLEY CRK | |
| 12/31/2008 | $120.00 | LENNI ELECTRIC CORPORA1 | SEWER PLANT - GUY WIRE RELOCATE | |
| 12/29/2008 | $7,865.00 | MACANGA INC. | TRUCK & TRACKHOE RENTAL 12/5-12/18 | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 050911.xls DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 12/1/2008 | $2,466.00 | PATTERSON, MICHAEL J. | MATERIALS & LABOR - SPLIT RAIL FENCE | |
| 12/1/2008 | $4,907.72 | PIPE XPRESS INC. | COPPER TUBING, BRASS COMP. COUPLING | |
| 12/15/2008 | $813.74 | PIPE XPRESS INC. | BURIAL HYDRANT, BRASS CURB STOP, & | |
| 12/29/2008 | $129.00 | RAM-T CORPORATION | 2 FT. SILT FENCE | |
| 12/1/2008 | $1,183.00 | RANSOME RENTAL COMPAN | CATERPILLAR - TRUCK LOADER RENTAL | |
| 12/8/2008 | $3,960.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 11/13-11/25/08 | |
| 12/29/2008 | $908.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15 - 12/18/08 | |
| 12/31/2008 | $1,044.85 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15-12/16/08 | |
| 12/8/2008 | $119.95 | SAFETY SOLUTIONS INC. | MEDICAL SUPPLIES | |
| 12/1/2008 | $635.60 | US MUNICIPAL SUPPLY INC. | CUSTOM SIGNS - RIDLEY CREEK TREATMT | |
| 12/31/2008 | $157.50 | GAWTHROP GREENWOOD | LEGAL | |
| 1/31/2009 | $936.50 | GAWTHROP GREENWOOD | LEGAL | |
| 3/19/2009 | $1,246.64 | HAMMOND & MCCMLOSY | WATER SERVICE | |
| 3/31/2009 | $1,254.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/2/2009 | $274.21 | PIPE XPRESS INC. | YARD HYDRANT #2 | |
| 4/2/2009 | $1,910.28 | HAMMOND & MCCMLOSY | WATER PIPING | |
| 5/11/2009 | $158.69 | US MUNICIPAL SUPPLY INC. | 3 SIGNS | |
| 4/30/2009 | $264.86 | LENNI ELECTRIC CORPORAT | WIRED HOT WATER HEATER | |
| 5/31/2009 | $133.00 | GAWTHROP GREENWOOD | LEGAL | |
| 6/30/2009 | $304.00 | GAWTHROP GREENWOOD | LEGAL | |
| 7/17/2009 | $1,481.00 | EAST GOSHEN TOWNSHIP | BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE) | |
| 9/10/2009 | $254.85 | AGWAY | TREE STAKES AND PEAT MOSS | |
| 8/25/2009 | $1,855.00 | HARMONY HILL NURSERIES | 16 TREES | |
| 8/31/2009 | $836.00 | GAWTHROP GREENWOOD | 2 MONTH LEGAL | |
| 11/19/2009 | $314.00 | VIMCO | SEALER FOR FLOORS | |
| 10/31/2009 | $285.00 | GAWTHROP GREENWOOD | LEGAL | |
| 12/31/2010 | $1,414.97 | L/B water | YARD HYDRANT #2 | |
| 12/18/2009 | $443.48 | Grainger | Hose Reel 1 inch | |
| 12/18/2009 | $267.98 | Grainger | Hose Reel 3/4 inch | |
| 2/2/2010 | $789.45 | Fisher Scientific | Lab Equipment | |
| 2/28/2010 | $57.00 | GAWTHROP GREENWOOD | LEGAL | |
| 3/15/2010 | $103.96 | Matthews Ford | Van rental | |
| 3/31/2010 | $275.50 | Grainger | Hose | |
| 3/31/2010 | $247.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/7/2010 | $70.15 | GREAT VALLEY LOCKSHOP | 6 locks | |
| 4/14/2010 | $641.98 | Grainger | Shelving | |
| 4/15/2010 | $1,127.48 | Continetal Fire & Safety | 3" & 1.75" Hose | |
| 4/16/2010 | $28.58 | Grainger | Phone | |
| 3/17/2010 | $1,092.01 | Water Pollution Biology | Michael Geradi - Talk | |
| 2/22/2010 | $1,104.50 | McNichols | Safety Grating | |
| 5/5/2010 | $1,078.38 | HAMMOND & MCCMLOSY | WATER LINE OFFICE | |
| 5/5/2010 | $270.10 | HAMMOND & MCCMLOSY | Hose fitting in storage room | |
| 5/3/2010 | $2,329.17 | Fisher Scientific | DESICCATOR & OVEN | |
| 5/12/2010 | $1,485.63 | Fisher Scientific | FURNACE | |
| 5/21/2010 | $456.81 | USA Blue book | beakers | |
| 4/29/2010 | $258.00 | Marco | 3 10Lb dry Chem FX |
4
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 050911.xls
DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 5/9/2010 | $142.47 | Staples | office equipment | |
| 5/31/2010 | $1,862.00 | GAWTHROP GREENWOOD | Legal | |
| 5/15/2010 | $39,937.70 | Aqua Wastwwater Mgt | Sludge from DAVCO | |
| 6/30/2010 | $126.63 | PIPE XPRESS INC. | pipe | |
| 6/15/2010 | $204.40 | GREAT VALLEY LOCKSHOP | locks | |
| 6/8/2010 | $150.00 | O'Rourke and Sons | Bend counter tops | |
| 6/29/2010 | $615.00 | PENNONI | Soda Ash | |
| 7/20/2010 | $99.99 | Office Depot | Printer | |
| 7/16/2010 | $50.39 | Office Depot | Printer cartridge | |
| 7/27/2010 | $649.00 | Newtown Office Supply | Desk | |
| 7/31/2010 | $589.00 | GAWTHROP GREENWOOD | Legal | |
| 6/29/2010 | $193.93 | Fastenal | Chain | |
| 6/29/2010 | $1,019.00 | LENNI ELECTRIC CORPORAT | Lights | |
| 7/12/2010 | $328.70 | HAMMOND & MCCMLOSY | sink | |
| 7/15/2010 | $154.23 | Hach | cable | |
| 7/16/2010 | $347.26 | Hach | Combo | |
| 8/8/2010 | $1,599.97 | Northern | Air Compressor | |
| 8/31/2010 | $1,310.00 | GAWTHROP GREENWOOD | LEGAL | |
| 8/3/2010 | $43.27 | Office Depot | White board | |
| 8/3/2010 | $37.08 | Office depot | White board | |
| 8/31/2010 | $2,623.51 | PIPE XPRESS INC. | pipe | |
| 9/1/2010 | $465.02 | PIPE XPRESS INC. | pipe | |
| 8/25/2010 | $357.50 | Main Line Concrete | Concrete | |
| 9/30/2010 | $1,242.50 | GAWTHROP GREENWOOD | LEGAL | |
| 10/7/2010 | $665.00 | O'Rourke and Sons | AC stand | |
| 10/18/2010 | $2,531.00 | Blosenski | Dumpster | |
| 10/13/2010 | ($105.00) | Power Pro | pallet credit | |
| 10/5/2010 | $2,073.90 | Power Pro | block and pallet charge | |
| 10/27/2010 | $17.50 | Power Pro | Re-bar | |
| 10/18/2010 | $577.93 | Martin Limestone | Stone | |
| 10/18/2010 | $296.35 | Martin Limestone | Stone | |
| 10/18/2010 | $299.83 | Martin Limestone | Stone | |
| 10/20/2010 | $270.75 | VIMCO | concrete products | |
| 10/20/2010 | $608.00 | RANSOME RENTAL COMPAN | Cat rental | |
| 10/25/2010 | $1,984.00 | RANSOME RENTAL COMPAN | Rental | |
| 10/5/2010 | $571.88 | Yerkes | PL Survey | |
| 10/23/2010 | $212.40 | Grainger | Door Parts | |
| 9/20/2010 | $88.32 | Yale Electric | Parts | |
| 9/21/2010 | $114.76 | Yale Electric | Parts | |
| 9/17/2010 | $450.00 | Steven Bahnatka | Wall Sign | |
| 9/7/2010 | $4,190.00 | M&S Service | Alarm system | |
| 9/10/2010 | $851.22 | HAMMOND & MCCMLOSY | HW heater | |
| 8/25/2010 | $337.50 | Main Line Concrete | side walks | |
| 9/1/2010 | $465.02 | PIPE XPRESS INC. | Roof Drains | |
| 9/7/2010 | $86.25 | PIPE XPRESS INC. | Water supply | |
| 9/14/2010 | $388.60 | EAST GOSHEN TOWNSHIP | Reimburse GF for Gutter Parts |
5
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 050911.xls
DETAIL
6
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 11/18/2010 | $2,474.04 | Fastenal | SS chain for lifting pumps | |
| 11/30/2011 | $171.00 | GAWTHROP GREENWOOD | Legal Clinger | |
| 11/30/2011 | $720.00 | GAWTHROP GREENWOOD | Legal | |
| 10/27/2010 | $17.50 | Power Pro | Re bar | |
| 10/18/2010 | $1,464.80 | Silvi | Concrete ( 3 invoices) | |
| 11/2/2010 | $1,125.21 | Reilly and Sons | Fuel | |
| 1/31/2011 | $2,592.50 | GAWTHROP GREENWOOD | Legal | |
| 1/31/2011 | $171.00 | GAWTHROP GREENWOOD | Legal | |
| 12/22/2011 | $655.00 | EnQuip | Filter | |
| 1/17/2011 | $2,031.00 | Faddis Concrete | concrete bollards | |
| 12/22/2011 | $2,598.00 | RANSOME RENTAL COMPAN | Restoration of parking area | |
| 2/28/2011 | $32.94 | UPS Store | Ship DO probe | |
| 2/28/2011 | $385.00 | GAWTHROP GREENWOOD | Legal | |
| Total | $138,901.26 | $138,901.26 | ||
| Extras - Capital - Identified capital extras that have not been paid | ||||
| $20,396.00 | Driveway Restoration | |||
| $3,300.00 | Restoration of parking area | |||
| $50,000.00 | $37,583.24 | Paving at RCSTP (we received a credit from Worth) | ||
| $6,500.00 | Audit | |||
| $67,779.24 | $67,779.24 | |||
| Extras - Capital - Identified capital extras that have been paid | ||||
| Paving at RCSTP | ||||
| 11/5/2011 | $1,828.36 | Highway | Blacktop | |
| 11/5/2011 | $1,841.53 | Highway | Blacktop | |
| 11/18/2011 | $260.42 | Highway | Blacktop | |
| 11/18/2010 | $1,147.06 | Highway | Blacktop | |
| 11/5/2010 | $3,136.40 | Independence | Blacktop | |
| 11/5/2011 | $4,202.99 | Independence | Blacktop | |
| Total | $12,416.76 | $12,416.76 | ||
| Trailer, Phone, Porta Potty & Internet | ||||
| 12/15/2008 | $1,039.10 | ACTON MOBILE INDUSTRIES | RENTAL MOBILE OFFICE | |
| 12/22/2008 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - THRU 1/19/09 | |
| 1/21/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 1/20-2/20/09 | |
| 2/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 2/20- 3/20/09 | |
| 3/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 3/20 - 4/19 | |
| 4/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 4/20 - 5/19 | |
| 5/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 5-20 - 6/19 | |
| 6/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 6/20 - 7/19 | |
| 7/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 7/20 to 8/19 | |
| 8/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 8/20 to | |
| 9/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | ||
| 10/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 11/19 | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 050911.xls DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 11/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 12/19 | |
| 12/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 1/19 | |
| 1/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 2/19/10 | |
| 2/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 3/19/10 | |
| 3/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 4/19 | |
| 4/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 5/19 | |
| 5/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 6/19 | |
| 6/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 7/19 | |
| 7/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 8/19 | |
| 9/20/2010 | $305.00 | ACTON MOBILE INDUSTRIES | Removal | |
| $6,126.10 | $6,126.10 | |||
| 12/15/2008 | $140.00 | POTTY QUEEN | RENTAL PORTABLE TOILET - RIDLEY CRK | |
| 12/22/2008 | $64.47 | POTTY QUEEN | RENTAL TOILET 12/23-1/10/08 | |
| 2/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 2/8-3/7 | |
| 3/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 3/8-4/4 | |
| 4/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 4/5-5/2 | |
| 5/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET ???? | |
| 7/26/2009 | $95.00 | POTTY QUEEN | RENTAL 7/26 TO 8/22 | |
| 8/23/2009 | $95.00 | POTTY QUEEN | Rental 8/23 to 9/19 | |
| 9/20/2009 | $95.00 | POTTY QUEEN | RENTAL 9/20 to 10/17 | |
| 10/18/2009 | $95.00 | POTTY QUEEN | 10/18/09 to 11/14/09 | |
| 11/14/2009 | $95.00 | POTTY QUEEN | 11/15 to 12/13 | |
| 12/13/2009 | $95.00 | POTTY QUEEN | 12/13 to 1/9/10 | |
| 1/10/2010 | $95.00 | POTTY QUEEN | 1/10/10 to 2/6/10 | |
| 2/7/2010 | $95.00 | POTTY QUEEN | 2/7/10 to 3/6/10 | |
| 3/7/2010 | $95.00 | POTTY QUEEN | 3/7 to 4/3 | |
| 4/4/2010 | $95.00 | POTTY QUEEN | 4/4 to 5/1 | |
| 5/2/2010 | $98.80 | POTTY QUEEN | 5/2 to 5/29 | |
| 5/30/2010 | $96.90 | POTTY QUEEN | 5/30 to 6/26 | |
| 6/30/2010 | $96.90 | POTTY QUEEN | 6/27 to 7/24 | |
| 7/28/2010 | $96.90 | POTTY QUEEN | 7/25 to 8/21 | |
| $1,923.97 | $1,923.97 | |||
| 12/22/2008 | $174.65 | VERIZON -7041 | NOVEMBER 25 - DECEMBER 6, 2008 | |
| 1/7/2009 | $137.87 | VERIZON -7041 | BILLING DATE 1/07/09 | |
| 2/7/2009 | $130.34 | VERIZON -7041 | BILLING DATE 2/07/09 | |
| 3/7/2009 | $133.97 | VERIZON -7041 | BILLING DATE 3/7/09 | |
| 4/7/2009 | $136.00 | VERIZON -7041 | BILLING DATE 4/7/09 | |
| 5/7/2009 | $137.66 | VERIZON -7041 | BILLING DATE 5/7/09 | |
| 6/7/2009 | $178.47 | VERIZON -7041 | BILLINGDATE 6/7/2009 | |
| 7/7/2009 | $145.21 | VERIZON -7041 | Billing Date 7/7/09 | |
| 8/7/2009 | $134.44 | VERIZON -7041 | Billing Date 8/7/09 | |
| 9/7/2009 | $132.93 | VERIZON -7041 | billing date 9/7/09 | |
| 10/7/2009 | $133.43 | VERIZON -7041 | Billing date 10/7/09 |
7
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 050911.xls
DETAIL
8
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 11/7/2009 | $133.79 | VERIZON -7041 | Billing Date 11/7/09 | |
| 12/7/2009 | $136.76 | VERIZON -7041 | Billing date 12/7/09 | |
| 1/7/2010 | $135.11 | VERIZON -7041 | Billing date 1/7/10 | |
| 2/7/2010 | $134.35 | VERIZON -7041 | Billing date 2/7/10 | |
| 3/7/2010 | $134.34 | VERIZON -7041 | Billing date 3/7/10 | |
| 4/7/2010 | $134.72 | VERIZON -7041 | Billing date 4/7/10 | |
| 5/7/2010 | $136.37 | VERIZON -7041 | billing ddate 5/7/2010 | |
| 6/7/2010 | $134.06 | VERIZON -7041 | Billing date 6/7/10 | |
| 7/7/2010 | $134.18 | VERIZON -7041 | Billing date 7/7/10 | |
| $2,788.65 | $2,788.65 | |||
| 8/31/2009 | $286.56 | VERIZON | INTERNET (FIRST BILL) | |
| 9/28/2009 | $69.99 | VERIZON | INTERNET | |
| 10/28/2009 | $69.99 | VERIZON | INTERNET | |
| 11/28/2009 | $69.99 | VERIZON | INTERNET | |
| 12/28/2009 | $69.99 | VERIZON | INTERNET | |
| 1/28/2010 | $69.99 | VERIZON | INTERNET | |
| 2/28/2010 | $69.99 | VERIZON | INTERNET | |
| 3/28/2010 | $69.99 | VERIZON | INTERNET | |
| 4/28/2010 | $69.99 | VERIZON | INTERNET | |
| 5/28/2010 | $69.99 | VERIZON | INTERNET | |
| 6/28/2010 | $69.99 | VERIZON | INTERNET | |
| $986.46 | $986.46 | |||
| Trailer, Phone, Porta Potty & Internet Total | $11,825.18 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\[Path]RCSTP EXPANSION EXPENSES 050911.xls DETAIL
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS
May 9, 2011
| NO. | AMOUNT | APPROVED | WORK | STATUS | PAID | |
|---|---|---|---|---|---|---|
| WORTH | 1 | $3,209.70 | 2/24/09 | BLOWER #1 REPAIR | APPROVED | NO |
| 4 | $5,542.80 | 5/11/09 | BLOWER #2 REPAIR | APPROVED | NO | |
| ? | $4,617.08 | ???? | BLOWER #3 REPAIR | APPROVED | NO | |
| 3 | $2,703.00 | 12/14/09 | ANTI-FLOT COLLAR | APPROVED | NO | |
| 5 | $6,784.65 | 12/14/09 | LARGER MIXER FOR FLOC TANK | APPROVED | NO | |
| 15 | $4,494.52 | 12/14/09 | REMOVABLE RAILS ON SBR TANK | APPROVED | NO | |
| 17 | $6,126.78 | 3/8/10 | BLOWER #4 REPAIR | APPROVED | NO | |
| 8 | -$6,250.00 | 3/8/10 | CREDIT FOR CAST IRON PIPE | APPROVED | NO | |
| -$20,000.00 | 2/8/10 | Credit for Electric Wages | APPROVED | NO | ||
| 9 | -$50,000.00 | 2/8/10 | Credit for paving | APPROVED | NO | |
| 19 | $27,702.20 | 5/20/10 | air drops | APPROVED | NO | |
| 20 | $3,516.77 | 5/20/10 | 2 doors | APPROVED | NO | |
| 21 | $18,094.59 | 5/20/10 | Paint DAVCO WALKWAYS | APPROVED | NO | |
| 22 | -$13,875.00 | 5/20/10 | Credit for concrete | APPROVED | NO | |
| 24 | $5,932.27 | 6/14/10 | Additional block for sludge building | APPROVED | NO | |
| 23 | $6,671.26 | 11/4/10 | Centrifuge Platform | APPROVED | NO | |
| 25 | $3,050.21 | 11/4/10 | Fence | APPROVED | NO | |
| 12 | $4,703.27 | 11/8/10 | Steel beam in control bldg | APPROVED | NO | |
| 18 | $4,499.12 | 11/8/10 | Control Joint Mod in Screen Bldg | APPROVED | NO | |
| 26 | $1,409.44 | 12/13/10 | gate in fence | APPROVED | NO | |
| Total | $18,932.66 | |||||
| CLINGER | Denied | EXTEND 34 KV LINES | DENIED | |||
| 1 | $5,106.00 | 7/1/09 | CORNER UNIT FOR MCC | APPROVED | NO | |
| 2 | $23,585.00 | SERVICE DISCONNECT | APPROVED | NO | ||
| 3 | $3,171.00 | 4/12/10 | Applebrook Pump | APPROVED | NO | |
| 4 | $1,451.24 | 3/23/10 | Cables for 2 chart recorders | APPROVED | NO | |
| 5 | $16,059.00 | 1/10/11 | Replace TVSS Units - filed claim with PECO and Ins. Co. | |||
| Total | $49,372.24 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 050911.xls
CHANGE ORDERS
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS
May 9, 2011
Potential capital extras
| Pipe conduit Conflicts | $0 |
|---|---|
| Controls | |
| Sludge room retrofit | $0 |
| HVAC Thermostats | $10,000 |
| Cathode Protection | $0 |
| Treatment Tanks | $0 |
| Electrician (increase in wages) | $11,357 |
| UV Channel | |
| Total potential extras | $21,357 * |
* Does not include Clinger
Potential Receipts
| Total Potential Receipts | $0 | $0 |
|---|
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 050911.xls POTENTIAL EXTRAS
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
PROJECTED FINAL COSTS
May 9, 2011
| Name | Budget or Contract amt. | Paid to Date | Projected Final Cost |
|---|---|---|---|
| EXPENSES | |||
| Borrowing costs | $52,250.00 | $52,250.00 | $52,250.00 |
| Worth | $7,865,400.00 | $7,770,336.12 | $7,865,400.00 |
| change orders | $18,932.66 | $0.00 | $18,932.66 |
| Clinger | $974,000.00 | $950,777.64 | $974,000.00 |
| change orders | $49,372.24 | $0.00 | $49,372.24 |
| Pennoni (Inspection) (05) | $136,200.00 | $136,197.62 | $136,197.62 |
| Pennoni (Continued Services) (10) | $206,320.00 | $203,413.17 | $215,000.00 |
| Pennoni (EC Response) (50) (new) | $9,990.00 | $9,990.00 | $15,000.00 |
| Pennoni (Rechargeable) (06) | $20,000.00 | $19,997.18 | $19,997.18 |
| Brickhouse | $175,000.00 | $217,509.00 | $225,000.00 |
| Extras | |||
| Capital | $384,534.10 | $138,901.26 | $140,000.00 |
| Capital (Identified but not paid) | $80,196.00 | $12,416.76 | $50,000.00 * |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $11,825.18 | $11,825.18 |
| SUB TOTAL | $9,984,195.00 | $9,523,613.93 | $9,772,974.88 |
| Refund for TVSS Units | -$16,059.00 | -$16,059.00 | |
| EXPENSES TOTAL | $9,968,136.00 | $9,523,613.93 | $9,756,915.88 |
| Project final cost vs. budget | |
|---|---|
| Original Budget | $9,500,000.00 |
| Projected final cost | $9,756,915.88 ** |
| Over(Under) | $256,915.88 |
| Percentage | 2.70% |
| Funds Left | |
|---|---|
| Total funds available | $9,984,195.00 |
| Projected final cost | $9,756,915.88 ** |
| Funds left | $227,279.12 |
* The Paving and driveway are expected to come in under budget
** Does not include Clinger
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 050911.xls Projections
Rick Smith
| From: | Scott_Towler@URSCorp.com |
|---|---|
| Sent: | Monday, April 18, 2011 6:29 PM |
| To: | rsmith@eastgoshen.org |
| Cc: | mmiller@eastgoshen.org; dbarbato@pennoni.com |
| Subject: | Fw: RE: Change order 5 |
| Attachments: | Ridley.pdf |
Rick,
Attached is the Worth change order number 5 with Jeff's signature for your file and presentation to the Authority Board.
Scott A. Towler, PE, SEO, LO
Water/Wastewater Program Manager
URS Corporation
335 Commerce Drive, Suite 300
Fort Washington, PA 19034-2720
Tel: 215.367.2500
Direct: 215.367.2581
Mobile: 484.401.4198
Fax: 215-367-1000
scott_towler@urscorp.com
-----Forwarded by Scott Towler/FtWashington/URSCorp on 04/18/2011 06:26PM -----
To: "Scott_Towler@URSCorp.com" <Scott_Towler@URSCorp.com>
From: Jeff Bush <JBush@worthandcompany.com>
Date: 04/18/2011 07:56AM
cc: Kariann Heckman <KHeckman@worthandcompany.com>
Subject: RE: Change order 5
Scott,
I have attached Co # 5.
Jeff
From: Scott Towler@URSCorp.com [mailto:Scott_Towler@URSCorp.com]
Sent: Thursday, April 14, 2011 3:01 PM
To: Jeff Bush
Cc: rsmith@eastgoshen.org; mmiller@eastgoshen.org
Subject: Change order 5
1
Jeff,
Attached change order 5 with regards to East Goshen Township Municipal Authority's RCSTP upgrade and expansion project. PCOs 12, 13, and 14 are included.
For your reference, PCOs 11 (additional SBR gate) and 19 (panic hardware) were previous decline by the Authority and are not included with this change order.
Please return a copy with your signature.
Thank you in advance.
Scott A. Towler, PE, SEO, LO
Water/Wastewater Program Manager
URS Corporation
335 Commerce Drive, Suite 300
Fort Washington, PA 19034-2720
Tel: 215.367.2500
Direct: 215.367.2581
Mobile: 484.401.4198
Fax: 215-367-1000
scott_towler@urscorp.com
This e-mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies.
This e-mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies.
2
CONTRACT CHANGE ORDER
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
Contract No. ___________________________ Date: March 14, 2011
Change Order No. 005 Project No.: EGMA 0707
Location: RCSTP
To: (Contractor) Worth & Company, Inc. 6263 Kellers Church Road, Pipersville, PA 18947
You are hereby requested to comply with the following changes from the contract plans and specifications:
| Item No. (1) |
Description of changes – quantities, units, unit prices, changes in completion schedule, etc. (2) |
Decrease in Contract Price (3) |
Increase in Contract Price (4) |
|---|---|---|---|
| PCO-12 | Transfer beam at Treatment building | $4,703.27 | |
| PCO-13 | Steel modification at control joint in Screen Building | $4,499.12 | |
| PCO-14 | Additional 12-ft wide gate installed within the perimeter fence of the facility. | $1,409.44 | |
| Change in contract price due to this Change Order: | $10,611.83 | ||
| Total decrease | |||
| Total increase | $10,611.83 | ||
| Difference between column (3) and (4) | $0.00 | ||
| Net (increase/decrease) contract price | $10,611.83 | ||
The sum of $10,611.83 is hereby [X] added to, [ ] deducted from, the total contract price and the total adjusted contract price to date thereby $7,895,689.91 dollars.
The time provided for completion in the contract is [ ] unchanged, [X] increased, [ ] decreased, by thirty one (31) calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply hereto.
Accepted by: Worth & Company, Inc. CONTRACTOR ___________________________ DATE 4-18-11
Recommended by: Pennoni Associates, Inc. ENGINEER ___________________________ DATE ___________________________
Approved by: East Goshen Township Municipal Authority OWNER ___________________________ DATE ___________________________
Brickhouse Environmental
Consultants and Engineers
RECEIVED BY: MAY 5 2011
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Invoice number 5928
Date 5/2/2011
Client ID: 548
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of April 2011.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 40.75 | 4,686.25 |
| Labor Total | 40.75 | 4,686.25 |
| Reimbursable | Amount |
|---|---|
| Expense Total | 0.00 |
| Invoice Total | 4,686.25 |
[Handwritten note: OK RS 5-5-11]
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com
When Creativity & Experience Count
Brickhouse Environmental
PROJECT ACCOMPLISHMENTS
EAST GOSHEN/RIDLEY CREED SEWAGE TREATMENT PLANT
UPGRADE/EXPANSION
BE PROJECT NO. 09-2532-0
APRIL 2011 SERVICES
- 4-4-11 Coordinate project meeting for April 6th. At the request of the plant operator, stopped by to investigate why the alum feed pump did not turn off in the automatic mode. Observed pump and confirmed that the pump does not stop pumping after the designated time has elapsed. Confirmed observations with Scott Stump, plant operator, and will follow with contractor.
- 4-5-11 Prepared revised Worth & Company change orders.
- 4-6-11 Prepare and attend on site meetings at EGTMA with the Authority, Worth & Co and Pennoni with regards to the status of final close out submittals and punch list items.
- 4-7-11 Review of Worth and Company's punch list items and status. Responded to Worth & Company that the Authority will accept the original contract value as the sum for the maintenance bond.
- 4-8-11 Finalize Worth CO 004 and 005. Prepare letters from Wednesday's meeting for Worth and Clinger. Prepare monthly Project Manager's report for April 11th's Authority's Board meeting.
- 4-8-11 Received call from Plant Operator reporting a problem with the electric receptacle for alum feed pump MP-31.
- 4-12-11 Received call from Plant Operator reporting problem with SBR #4 blower failing to remain in service while the dissolved oxygen concentration is lower than the set point while the DO control is enabled. No problem was determined and the blower appeared to resume operation as intended in the automatic mode. Follow up with regards to the Authority meeting on Monday, 4/11.
- 4-14-11 Prepare Worth and Co change order 5, update Worth & Co change order spreadsheet, email change order 5 to Jeff Bush. Preliminary preparation of project close out and punch list status letter to Worth & Co. Contact Mat McAloon, Pennoni, for clarification of the punch list update date April 6, 2011. Progress on letter halter until receipt of clarification/update from matt McAloon. Review email from Dan Barbato regarding Steve Seacrist's comments regarding close out documents from Clinger.
Brickhouse Environmental
PROJECT ACCOMPLISHMENTS
EAST GOSHEN/RIDLEY CREED SEWAGE TREATMENT PLANT
UPGRADE/EXPANSION
BE PROJECT NO. 09-2532-0
APRIL 2011 SERVICES
- 4-15-11 Follow with Matt McAloon regarding punch list status. Visit RCSTP to follow up on outstanding warranty and punch list items,
- 4-20-11 On site at RCSTP to assist with blower operation (SBR 3 vfd appears to be malfunctioning0, alum pump MP-31 (fuse blown) and review of main power quality meter.
- 4-21-11 Update project file and telephone call from Scott Stump.
- 4-22-11 Follow up actions for sbr 3 vfd, Worth warranty issues, letter for centrifuge acceptance test.
- 4-26-11 Emails and updates regarding warranty issues with plant.
- 4-27-11 On site all day addressing issues identified by the Plant Operator. Clinger on site to evaluate vfd #3. Worth on site to work on the air cushioned check valve for influent pump no. 3, replace DO probe apparatus for SBR1, and evaluate the soda ash feed pump.
- 4-28-11 On site for 1-1/2 hours. Coordinate with Mark from Siemens regarding UV system. Prepare and distribute list of actions completed on 4/27/2011. Work on data summary and information for Paul Christiansen.
- 4-29-11 Prepare centrifuge acceptance letter for Pennoni to review and make a recommendation to the Municipal Authority. Prepare draft letters for Clinger and Worth for final closeout.
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
Brickhouse's contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours and $175,030.
From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.
The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting which then expended the original 1,522 hours.
The Board subsequently approved Brickhouse Environmental to continue to serve the Authority's needs as requested on a T&M basis.
| Month | Project Subtotals | |||
|---|---|---|---|---|
| Pro. Mgt. Hours | Cumulative Hours | Cumulative Fees | Monthly Fees | |
| October 2010 | 36.25 | 36.25 | $4,168.75 | $4,168.75 |
| November 2010 | 86.50 | 122.75 | $14,116.25 | $9,947.50 |
| December 2010 | 136.00 | 258.75 | $29,756.25 | $15,640.00 |
| January - February 4, 2011 | 97.75 | 356.50 | $40,997.50 | $11,241.25 |
| February - March 4, 2011 | 58.00 | 414.50 | $47,667.50 | $6,670.00 |
| March - April 1, 2011 | 50.00 | 464.50 | $53,417.50 | $5,750.00 |
| April 2 - April 30, 2011 | 40.75 | 505.25 | $58,103.75 | $4,686.25 |
| Project Management Hours | Fee |
|---|---|
| 2,027.25 | $232,433.75 |
\092532.0\Project Management\PM Schedule\Extended Schedule.xls
Page 1 of 1
Pennoni Associates Inc.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 470592
Invoice Date: 04/29/2011
Project: EGMA0707
Project Name: RCSTP Expansion
For Services Rendered through: 04/17/2011
Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist progress review; site observation and consultation with Township regarding same. Meetings to discuss punchlists with contractors, troubleshooting and operations review, and project closeout activities. Investigation, documentation, meetings and support related to Electrical Contractor claims.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Permit Design | est. $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. $208,795.00 | $203,113.17 | $207,301.47 | $4,188.30 | |
| Total : | $731,795.00 | $725,978.97 | $730,167.27 | $4,188.30 |
Phase : 50 -- EC Response
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Senior Engineer | 3.50 | 105.00 | 367.50 |
| Authority Engineer | 3.00 | 110.00 | 330.00 |
| Technical Specialist | 9.00 | 75.00 | 675.00 |
| Labor Total: | 15.50 | $1,372.50 | |
| Phase Subtotal | $1,372.50 |
Amount Due This Invoice: $5,560.80
[Handwritten note: ok RS 5-2]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls 04.11.xls
Invoice Date 04-29-2011
Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 470592
Invoice Period: 3/21/2010 to 4/17/2011
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
|---|---|---|---|
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Changes: | $ 11,500.00 | Date: | 6/14/2010 |
| Changes: | $ 40,400.00 | Date: | 8/5/2010 |
| Changes: | $ 18,720.00 | Date: | 10/11/2010 |
| Changes: | $ 14,000.00 | Date: | 1/10/2011 |
| Changes: | $ 2,475.00 | Date: | 4/7/2011 |
| Contract Amount: | $ 731,795.00 | ||
| Previously Invoiced: | $ 725,978.97 | ||
| Current Invoice: | $ 4,188.30 | ||
| Invoiced to Date ($): | $ 730,167.27 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 1,627.73 | ||
| Remaining Budget (%): | 0.22% |
* Note: Calculations do not include Phase 50, which is billed on a time and material basis.
Budget by Phase:
Phase No. 10
Phase Name: Continued Eng Svcs
| Phase Budget: | $ 99,700.00 |
|---|---|
| Changes: | $ 33,500.00 |
| Changes: | $ 40,400.00 |
| Changes: | $ 18,720.00 |
| Changes: | $ 14,000.00 |
| Changes: | $ 2,475.00 |
| Contract Amount: | $ 208,795.00 |
| Previously Invoiced: | $ 203,113.17 |
| Current Invoice: | $ 4,188.30 |
| Invoiced to Date ($): | $ 207,301.47 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 1,493.53 |
| Remaining Budget (%): | 1% |
Comments: Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist progress review; site observation and consultation with Township regard [sic]; Meetings to discuss punchlists with contractors, troubleshooting and operations review, and project close [sic] Investigation, documentation, meetings and support related to Electrical Contractor claims.
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 230.75 | 6.50 | 237.25 |
| Senior Engineer | 439.00 | 1.00 | 440.00 |
| Senior Designer | 222.00 | 0.00 | 222.00 |
| Project Engineer | 164.50 | 19.00 | 183.50 |
| Staff Engineer | 13.50 | 0.00 | 13.50 |
| Associate Engineer | 84.50 | 1.00 | 85.50 |
| Graduate Engineer | 43.75 | 0.00 | 43.75 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 1131.75 | 20.00 | 1151.75 |
| Engineering Technician I | 57.25 | 0.00 | 57.25 |
| Administrative Assistant I | 1.50 | 2.00 | 3.50 |
| Totals | 2391.00 | 49.50 | 2440.50 |
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
COPY
Page: 1
03/31/2011
Client No: 6604-08M
Invoice No. 88002
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Ridley Creek Treatment Plant - Arbitrations
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 03/02/2011 SRM |
Telephone conference with R Cohen. | 0.10 | 17.50 |
| 03/11/2011 SRM |
Preparation of memo to client regarding status. | 0.50 | 87.50 |
| 03/14/2011 RFA |
Review message from Rick and Joe McCawley regarding update on Clinger arbitration; review message from Steve McDonnell regarding status of Clinger matter; Message to Rick Smith regarding status report on Clinger. | 0.90 | 157.50 |
| 03/21/2011 SRM |
Correspondence to R Cohen regarding mediation. | 0.20 | 35.00 |
| 03/23/2011 SRM |
Telephone conference with J McCawley regarding status. | 0.20 | 35.00 |
| 03/25/2011 SRM |
Revise table; telephone conference with R Adams. | ||
| For Current Services Rendered | 1.90 | 332.50 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 0.90 | $175.00 | $157.50 |
| Stephen R. McDonnell | 1.00 | 175.00 | 175.00 |
Expenses
| Westlaw research charges | 109.57 |
|---|---|
| Total Expenses Thru 03/31/2011 | 109.57 |
| Previous Balance | $385.00 |
East Goshen Municipal Authority
Ridley Creek Treatment Plant - Arbitrations
Page: 2
03/31/2011
Client No: 6604-08M
Invoice No. 88002
| Total Current Charges | 442.07 |
|---|---|
| 03/17/2011 Fee Payment | -385.00 |
| Balance Due | $442.07 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Ransome Rental Co., LP
THE CAT Rental STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
INVOICE
Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SHIP TO
SEWER PLANT
1751 TOWNE DRIVE
WEST CHESTER, PA
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| K0403101 | 04-07-11 | 1268550 | 30 | R | 095 LR | 2 | 1 | |
| Agreement Number | Agreement Date | PC LC | MC 10 | Ship Via SHIPPED IN PA |
Inv Seq No 369026 |
|||
| K04031 | 04-04-11 | |||||||
| Make AA |
Model 314CLCR |
Serial Number PCA01243 |
Equipment Number | Meter Reading 2866.0 |
Mach Id No LP3178 |
|||
CUSTOMER CONTACT: STEVE
TAX EXEMPTION LICENSE PA
| 1.0 | EQUIPMENT RENTAL FROM 04/06/11 THRU 04/06/11 CATERPILLAR MODEL 314CLCR HYD EXCAVATOR ID NO: LP3178 SERIAL NO: PCA01243 PIN: *CAT0314CKPCA01243* ATT: AA 000800302 CATERPILLAR ID NO: CR80302 BUCKET, 30" 0.60 CYD (HD) REF: 208-3675 |
600.00 |
|---|---|---|
| 1.0 | ENVIRO CHARGE | 8.00 |
| 1.0 1.0 |
CUST TRANSPORT IN PA (ONE WAY) |
100.00 |
RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).
APPROVED BY: [Signature]
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7454
Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment.
| PLEASE PAY THIS AMOUNT | 708.00 |
|---|---|
| AMOUNT CREDITED |
CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300
Ransome Rental Co., LP
THE CAT Rental STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
INVOICE
Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SHIP TO
CUSTOMER PICKUP IN WEST CHESTER
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| K0404301 | 04-11-11 | 1268550 | 30 | R | 095 LR | 2 | 1 | |
| Agreement Number | Agreement Date | PC LC | MC 10 | Ship Via CPU IN PA |
Inv Seq No 369134 |
|||
| K04043 | 04-05-11 | |||||||
| Make AA |
Model D3GLGP |
Serial Number BYR02081 |
Equipment Number | Meter Reading 296.0 |
Mach Id No CR30042 |
|||
CUSTOMER CONTACT: MARK MILLER
TAX EXEMPTION LICENSE PA
| 1.0 | EQUIPMENT RENTAL FROM 04/07/11 THRU 04/08/11 CATERPILLAR MODEL D3GLGP TRK-TYPE TRACTOR ID NO: CR30042 SERIAL NO: BYR02081 PIN: *CAT00D3GEBYR02081* |
375.00 |
|---|---|---|
| 1.0 | CLEANING CHARGE | 40.00 |
| 1.0 | ENVIRO CHARGE | 8.00 |
| 1.0 | CUST |
RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).
APPROVED BY: ___________________________
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7455 7454
[Handwritten note: Plant Exp. temp Parking lot]
Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment.
| PLEASE PAY THIS AMOUNT | 423.00 |
|---|---|
| AMOUNT CREDITED |
CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300
Ransome Rental Co., LP
THE CAT Rental STORE
RENTAL AGREEMENT
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
Lessee / Bill To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Ship To
CUSTOMER PICKUP IN WEST CHESTER
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| 4/07/11 | 1268550 | 30 | R | 095 | 2 | 1 | ||
| Agreement Number | Agreement Date | PC LC | MC 10 | Ship Via CPU IN PA |
Inv Seq No | |||
| K04043 | 4/05/11 | |||||||
| Make AA |
Model D3GLGP |
Serial Number 0BYR02081 |
Equipment Number | Meter Reading 289.0 |
Mach Id No CR30042 |
|||
CUSTOMER CONTACT: MARK MILLER
PHONE: 610 656 2742
| ITEM IDNO: CR30042 MODEL: D3GLGP SERIAL NUMBER: 0BYR02081 PIN: *CAT00D3GEBYR02081* DESC: TRK-TYPE TRACTOR TIME OUT: 07:00 DATE OUT: 4/07/11 METER OUT: 289.0 |
QTY 1.0 |
RENTAL RATE 3,225.00 1,100.00 375.00 |
PERIOD 4 WEEK WEEK DAY |
MKT VAL 90,558.00 |
|---|---|---|---|---|
| EXPECTED RETURN DATE: 4/14/11 SHIP VIA: CPU IN PA |
||||
MISCELLANEOUS CHARGES
| CLEANING CHARGE | 1 | 40.00 |
|---|---|---|
| ENVIRO CHARGE | 1 | 8.00 |
| CUST | 1 | .00 |
RE-FUEL CHARGE PER GALLON $6.00
NON-RETURNED KEY CHARGE $10.00
****PLEASE READ ALL OPERATOR SAFETY MANUALS****
PLEASE CALL TO RELEASE EQUIPMENT WHEN FINISHED
TOLL FREE 1-888-438-RENT (7368)
DAY=8 HOURS, WEEK=40 HOURS, 4 WEEK=160 HOURS
CLEANING CHARGE: NONE ____ STANDARD ____ HEAVY ____
APPROVED BY: [Initials]
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7454
[Handwritten note: Grade Parking lot]
OFF RENT
Date: 4/8/11
Time: 7 AM
Call Off #: 84-SNS-4803
| Delivery Date: ___________________ | Time: ___________________ | Pick Up Date: ___________________ | Time: ___________________ |
|---|---|---|---|
| Delivery Condition Hour Meter: ___________________ Fuel Out: ___________________ Sheet Metal: ___________________ Tires: ___________________ Attach/Misc.: ___________________ |
Return Condition Hour Meter: ___________________ Fuel In: ___________________ Sheet Metal: ___________________ Tires: ___________________ Attach/Misc.: ___________________ |
||
| Accepted & Received By Renter: ___________________ Date: _________ Please Print Name: ___________________ |
Customer Return Signature: [Signature] Date: 4/8/11 | ||
SEE TERMS ON BACK
RENTERS/LESSEE RESPONSIBILITIES: Renter/Lessee must check & maintain all fluid levels and lubricating points (engine oil, water, hydraulic oil, fuel, battery, greasing pins, etc.) DAILY. TIRE DAMAGE: Excessive wear, tire repair, and any damage to rented machine are renter's responsibility. Machine to be returned in reasonable clean condition. Minimum cleaning charge of $100 will be assessed if returned dirty. Renter will be charged for refueling. Daily inspect unit for damage, leaks, etc. and report problems immediately to Ransome Rents. The equipment described above has been received in good repair and operating condition.
FIRE/THEFT/VANDALISM
FTV (FIRE/THEFT/VANDALISM WAIVER) will be charged at 14% of the rental amount. This damage waiver covers theft, fire and vandalism only. You remain responsible for physical damage or injury. Fire/Theft/Vandalism waiver (FTV) is not insurance.
** Not available on Heavy Equipment Rentals. **
Ransome Rental Co., LP offers training on all rental equipment. | TRAINING DECLINED (Please Initial) ________
Ransome Rental Co., LP
THE CAT Rental STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
INVOICE
Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SHIP TO
CUSTOMER PICKUP IN WEST CHESTER
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| K0404301 | 04-11-11 | 1268550 | 30 | R | 095 LR | 2 | 1 | |
| Agreement Number | Agreement Date | PC LC | MC 10 | Ship Via CPU IN PA |
Inv Seq No 369134 |
|||
| K04043 | 04-05-11 | |||||||
| Make AA |
Model D3GLGP |
Serial Number BYR02081 |
Equipment Number | Meter Reading 296.0 |
Mach Id No CR30042 |
|||
CUSTOMER CONTACT: MARK MILLER
TAX EXEMPTION LICENSE PA
| 1.0 | EQUIPMENT RENTAL FROM 04/07/11 THRU 04/08/11 CATERPILLAR MODEL D3GLGP TRK-TYPE TRACTOR ID NO: CR30042 SERIAL NO: BYR02081 PIN: *CAT00D3GEBYR02081* |
375.00 |
|---|---|---|
| 1.0 | CLEANING CHARGE | 40.00 |
| 1.0 | ENVIRO CHARGE | 8.00 |
| 1.0 | CUST |
RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).
APPROVED BY: ___________________________
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7455 7454
[Handwritten note: Plant Exp. temp Parking lot]
Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment.
| PLEASE PAY THIS AMOUNT | 423.00 |
|---|---|
| AMOUNT CREDITED |
CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300
Ransome Rental Co., LP
THE CAT Rental STORE
RENTAL AGREEMENT
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
Lessee / Bill To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Ship To
CUSTOMER PICKUP IN WEST CHESTER
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| 4/07/11 | 1268550 | 30 | R | 095 | 2 | 1 | ||
| Agreement Number | Agreement Date | PC LC | MC 10 | Ship Via CPU IN PA |
Inv Seq No | |||
| K04043 | 4/05/11 | |||||||
| Make AA |
Model D3GLGP |
Serial Number 0BYR02081 |
Equipment Number | Meter Reading 289.0 |
Mach Id No CR30042 |
|||
CUSTOMER CONTACT: MARK MILLER
PHONE: 610 656 2742
| ITEM IDNO: CR30042 MODEL: D3GLGP SERIAL NUMBER: 0BYR02081 PIN: *CAT00D3GEBYR02081* DESC: TRK-TYPE TRACTOR TIME OUT: 07:00 DATE OUT: 4/07/11 METER OUT: 289.0 |
QTY 1.0 |
RENTAL RATE 3,225.00 1,100.00 375.00 |
PERIOD 4 WEEK WEEK DAY |
MKT VAL 90,558.00 |
|---|---|---|---|---|
| EXPECTED RETURN DATE: 4/14/11 SHIP VIA: CPU IN PA |
||||
MISCELLANEOUS CHARGES
| CLEANING CHARGE | 1 | 40.00 |
|---|---|---|
| ENVIRO CHARGE | 1 | 8.00 |
| CUST | 1 | .00 |
RE-FUEL CHARGE PER GALLON $6.00
NON-RETURNED KEY CHARGE $10.00
****PLEASE READ ALL OPERATOR SAFETY MANUALS****
PLEASE CALL TO RELEASE EQUIPMENT WHEN FINISHED
TOLL FREE 1-888-438-RENT (7368)
DAY=8 HOURS, WEEK=40 HOURS, 4 WEEK=160 HOURS
CLEANING CHARGE: NONE ____ STANDARD ____ HEAVY ____
APPROVED BY: [Initials]
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7454
[Handwritten note: Grade Parking lot]
OFF RENT
Date: 4/8/11
Time: 7 AM
Call Off #: 84-SNS-4803
| Delivery Date: ___________________ | Time: ___________________ | Pick Up Date: ___________________ | Time: ___________________ |
|---|---|---|---|
| Delivery Condition Hour Meter: ___________________ Fuel Out: ___________________ Sheet Metal: ___________________ Tires: ___________________ Attach/Misc.: ___________________ |
Return Condition Hour Meter: ___________________ Fuel In: ___________________ Sheet Metal: ___________________ Tires: ___________________ Attach/Misc.: ___________________ |
||
| Accepted & Received By Renter: ___________________ Date: _________ Please Print Name: ___________________ |
Customer Return Signature: [Signature] Date: 4/8/11 | ||
SEE TERMS ON BACK
RENTERS/LESSEE RESPONSIBILITIES: Renter/Lessee must check & maintain all fluid levels and lubricating points (engine oil, water, hydraulic oil, fuel, battery, greasing pins, etc.) DAILY. TIRE DAMAGE: Excessive wear, tire repair, and any damage to rented machine are renter's responsibility. Machine to be returned in reasonable clean condition. Minimum cleaning charge of $100 will be assessed if returned dirty. Renter will be charged for refueling. Daily inspect unit for damage, leaks, etc. and report problems immediately to Ransome Rents. The equipment described above has been received in good repair and operating condition.
FIRE/THEFT/VANDALISM
FTV (FIRE/THEFT/VANDALISM WAIVER) will be charged at 14% of the rental amount. This damage waiver covers theft, fire and vandalism only. You remain responsible for physical damage or injury. Fire/Theft/Vandalism waiver (FTV) is not insurance.
** Not available on Heavy Equipment Rentals. **
Ransome Rental Co., LP offers training on all rental equipment. | TRAINING DECLINED (Please Initial) ________
Fisher & Son COMPANY, INC.
INVOICE
Fisher & Son Company, Inc.
110 Summit Drive
Exton, PA 19341 USA
8002622127
APPROVED BY: [Signature]
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7440
Sold To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380 USA
Ship To
SHIP EAST50
1580 PAOLI PIKE
WEST CHESTER, PA 19380 USA
| Date | Salesperson | Number | Customer | Due Date |
|---|---|---|---|---|
| 4/18/2011 | dhunley | 0000087217-IN | EAST50 | 5/18/2011 |
| Customer P.O. MARK |
Ship Via | ORIGIN | F.O.B | Terms Net 30 |
| Item | UOM | Description | Qty Shipped | Price | Amount |
|---|---|---|---|---|---|
| S32258 Sales Order: SO-0000082472 |
bag | LINKS FINE FESCUE SEED 50 LB: LINKS FINE FESCUE SEED 50 LB Package Size: 50 lb bag |
2.00 | $80.00 | $160.00 |
| S350 Sales Order: SO-0000082472 |
lb | WILDFLOWER NORTHEAST SEED MIX LB Package Size: 1 lb |
6.00 | $35.00 | $210.00 |
| LAST ITEM | |||||
| Subtotal | Sales Tax | Freight | Terms Discount | Trade Discount | Pmt/CM/DM Amount | Total Due |
|---|---|---|---|---|---|---|
| 370.00 | 0.00 | 0.00 | 0.00 | 0.00 | -0.00 | 370.00 |
REMIT TO:
Fisher & Son Company, Inc.
110 Summit Drive
Exton, PA 19341 USA
8002622127
CALL MARK WHEN IN 610-656-2742
Customer: EAST50
Name: EAST GOSHEN TOWNSHIP
Contact: STEVE WALKER
Please detach and return this portion with your remittance.
Due Date: 5/18/2011
Number: 0000087217-IN
Date: 4/18/2011
| Subtotal | 370.00 |
|---|---|
| Freight | 0.00 |
| Sales Tax | 0.00 |
| Terms Discount | 0.00 |
| Trade Discount | 0.00 |
| Payment/Credit Amount | -0.00 |
| Total Due | 370.00 |
Fisher & Son COMPANY, INC.
110 Summit Drive
Exton, PA 19341 USA
(800) 262-2127
Sales Order
Page: 1
Order Number: 0000082472
Order Date: 4/6/2011
Change Order: 0
Confirm No:
Salesperson: dhunley
Customer: EAST50
Customer PO: MARK
Sold To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380 USA
Ship To
SHIP EAST50
1580 PAOLI PIKE
WEST CHESTER, PA 19380 USA
Contact: STEVE WALKER
Phone: (610) 692-7171
CALL MARK WHEN IN 610-656-2742
| Acknowledged | Requested | Ship Via | F.O.B | Terms |
|---|---|---|---|---|
| 4/6/2011 | Pickup | ORIGIN | Net 30 |
| # | Item | Ordered | UOM | Quantity Shipped | Back Ordered | Unit Price | Amount |
|---|---|---|---|---|---|---|---|
| 1 | S32258 LINKS FINE FESCUE SEED 50 LB: LINKS FINE FESCUE SEED 50 LB Package Size: 50 lb bag |
2.00 | bag | 0.00 | 2.00 | 80.00 | 160.00 |
| 2 | S350 WILDFLOWER NORTHEAST SEED MIX LB Package Size: 1 lb |
6.00 | lb | 0.00 | 0.00 | 35.00 | 210.00 |
APPROVED BY: [Signature]
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 07424-7454
[Handwritten note: Restoration to storage yard]
| Net Order: | 370.00 |
|---|---|
| Discount: | 0.00 |
| Freight: | 0.00 |
| Sales Tax: | 0.00 |
| Balance USD | 370.00 |
APPROVED BY:
X ___________________________
No Returns Accepted without Customer Receipt - Restocking Fee May Apply
Lenni Electric Corporation
Service Invoice
Invoice#: 110445
Date: 04/30/2011
APPROVED BY: [Signature]
DATE PAID: ___________________________
CHECK #: ___________________________
CHARGED TO: 05422- 07424-7440
Billed To:
East Goshen Township
1580 Paoli Pike
West Chester PA 19380
Project: 31153
RIDLEY CREEK STATION
WEST CHESTER PA 19380
Scheduled: 04/04/2011
Time:
Employee:
Order#:
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| RIDLEY CREEK - NEW WELL PUMP RIDLEY CREEK STATION INSTALL POWER TO NEW WELL PUMP INSTALL PIPE AT MCC; RUN TO DISCONNECT; INSTALL SAFETY SWITCH; PULL WIRE FROM SWITCH TO PANEL; TERMINATE; PULL WIRE TO PRESSURE SWITCH; TEST BULK OF MATERIALSUPPLIED BY EGT |
||||
| ELECTRICIANS - 2 MEN, 8 HRS EA | HR | 16.00 | 67.00 | 1,072.00 |
| SERVICE TRUCK | HR | 1.00 | 20.00 | 20.00 |
| SAFETY SWITCH & MC | LS | 1.00 | 92.69 | 92.69 |
Notes:
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
| Non-Taxable Amount: | 1,184.69 |
|---|---|
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due | 1,184.69 |
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 11, 2011
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday April 11, 2011 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Chairman Joseph McCawley, Jack Yahraes, Fran Beck, Dana Pizarro, and Kevin Cummings. Also in attendance were: Rick Smith, Township Manager; Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; William Ronyack (Miller Environmental); Carmen Battavio, Township Supervisor, Ellen Carmody (Historical Commission) and Walter Wujcik (Conservancy Board).
COMMON ACRONYMS:
| MA – Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lochwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Joe McCawley called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
2. RIDLEY CREEK REPORTS
A. Brickhouse Report
During the month of March, significant progress was accomplished towards the requirements for final close out of the RCSTP upgrade and expansion project. Both contractors progressed towards final close out and the treatment plant operation is achieving compliance with the NPDES permit and processing solids on a regular basis.
The general/mechanical contractor has progressed towards finalizing the submittals required for project close out. All close out submittals are anticipated to be received by the Authority's Engineer by April 15, 2011 for review.
Current Warranty and close out sodium hypochlorite for submittals items include:
- Siemens Sunlight UV system bank number 2 has a few burned ballast fuses
- Verification that all alarms function as intended
- Certified release of liens
- Maintenance bond
- Certified evidence of payment and release of liens
- Final review and acceptance by Authority Engineer
The electrical contractor has progressed towards completing the punch list items and close out submittals. Required studies, test reports and certifications required by contract specifications are under review by the design engineer.
Outstanding punch list and close out submittals include:
- Inclusion of MCC1 within the arc flash study
MA Minutes 04/11/2011 1
- Record drawings and documents
- Operation and maintenance manuals
- Certified release of liens
- Maintenance bond
- Certified evidence of payment and release of liens
- Final review and acceptance by Authority Engineer
Corrective measures to reduce the filamentous bacterium reduction were placed on hold as chemical feed system was adjusted for automatic control. Adjustments to the pump and control system logic were completed on April 7, 2011. Reinstatement of the plan to reduce the filamentous bacterium using sodium hypochlorite is anticipated to resume April 11, 2011.
Paul Christiansen from Siemens has been rescheduled by Siemens to visit the site on May 10th 11th and 12th to provide technical support and training.
- Current plant operating information will be provided prior to Paul's visit
- The SBR performance warranty test has been postponed until the treatment facility can be restored to original intended design set points
- The one year inspection of the Jet tech SBR basins for the following items has been proposed to begin after Paul Christiansen's visit. Tasks scheduled are as follows: Inspect the condition and confirm the torque of the fasteners of the equipment within the basin; Inspect the basin walls and floors for cracks and water penetration; Inspect the CIMS 1000 sealant condition; Overall evaluation of the equipment; Remove any grit and debris
The project remains substantially complete with final closeout pending.
B. Pennoni – Dan Barbato, reported the following:
RCSTP Upgrade and Expansion
- Construction phase services continue with punch list monitoring, final review of operations and maintenance submittals, progress meetings, troubleshooting, and coordination with the Project Manager and the Township.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation continue working on punch list completion. A punch list update for both contractors was distributed for review and comments were received from both Contractors. Verification of completed items is in progress. Worth and Company appears to be complete with the exception of a few small items. Clinger Corporation has multiple punch list items including Operations and Maintenance Manual submittals. Clarification will be sent by the Project Manager to Clinger regarding closeout requirements.
- A coordination meeting was held on Wednesday April 6 in the Township office. The project team met first without the contractors to discuss the current status of the two
MA Minutes 04/11/2011 2
contractors. A list of open items for discussion with the contractors was developed. Key topics included punch list completion and contractual time requirements for project completion. The second meeting immediately followed and included Worth & Company. Clinger Corporation cancelled and was not in attendance. The punch list for Worth was reviewed and subject to field verification, only a few items remain. Worth requested AutoCAD files for their use in producing as-built plans. Pennoni will provide these files. Warranty periods were clarified as well and O&M manual status and closeout documentation. Worth anticipates closeout within three weeks. After the meeting, Pennoni provided clarification to the Project Manager on Clinger's responsibilities for as-builts and record documents.
- Pennoni submitted the NPDES permit renewal application to DEP and we received a letter from DEP stating that the application is administratively completed.
I / I Metering Project
- The Township continues to meter flows at selected locations. Meters are in operation at locations as recommended, and we will review all meter data as it is submitted.
Ridley Creek Consent Order
- The next report for March was submitted to DEP in advance of the deadline. We have not received comments from DEP at the time of this report.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- The Lockwood Chase report was approved by DEP on March 29.
- DEP is reviewing our response to their comments for the Hersheys Mill/Reserve report. We have not received additional formal comments from DEP.
- A proposal for design of the Lockwood Chase elimination project will be submitted to the Authority in April.
Marydell PS Elimination Planning
- The draft report for the Act 537 Plan Revision was submitted to the Township for review on March 9. We are incorporating the Authority's comments and will make the required Component 4 submissions to the East Goshen Planning Commission, West Goshen Planning Commission, Chester County Planning Commission, and Chester County Health Department after finalizing the report.
Chapter 94 Report
- The annual updates to the Chapter 94 report were submitted to DEP in advance of the deadline.
Applebrook Spray Irrigation NPDES Permit Renewal
- We will prepare the NPDES discharge permit.
C. Cost Summary Report
No report.
D. Change Orders – None
MA Minutes 04/11/2011 3
3. RCSTP INVOICES
A. Brickhouse Environmental #5893, $5,750.00. Jack moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
B. Pennoni, $2,475.00 estimate of fees required to reach April 30 completion date. Jack moved to approve payment. Fran seconded the motion. Kevin doesn't feel there is much closeout each month. Can the Municipal Authority chargeback? Rich answered yes. There was no further discussion. The motion passed unanimously.
4. CHAIRMAN'S REPORT
A. None
5. APPROVAL OF MINUTES
A. Kevin moved to approve the minutes of the March 14, 2011 meeting as corrected. Fran seconded the motion. The motion passed unanimously.
6. APPROVAL OF INVOICES
A. None
7. LIAISON REPORTS
A. Conservancy Board – Walter reported that they are working on a plan to control invasives in 5 years. They are also working on an understory planting in the new forest area.
B. Historical Commission – Ellen reminded everyone that June 4th is Living History Day.
8. FINANCIAL REPORTS
Financial reports were reviewed.
9. OLD BUSINESS
A. Pennoni project budgets – Dan listed items that required them to expend fees beyond their project budgets. In lieu of requesting additional budget for the projects, Dan proposed to transfer some of the additional time from the “Plan Update” phases to the Additional Meeting” phase for each project. In the budget for both projects, there is an “Additional Meeting” phase with a budget of $1,500. These budgets are unused to date. Their additional expenditures are greater than $1,500, but in an effort to keep the projects within budget, they would be satisfied with using just the budget in these phases. He believes that using the meetings phase is appropriate as much of their time constituted telephone conferences with DEP and reviewing agencies. The Authority approved this.
10. NEW BUSINESS
A. Mark Miller asked the Authority to consider waiving the tapping fee for Mr. Turner if he decides to divide his property. Rick will have a letter for review at the next meeting.
11. CAPACITY REQUESTS
None
12. SEWER REPORTS
A. Mark Miller reported the following:
Meters – The meters were read on a daily basis with no problems to report.
MA Minutes 04/11/2011
4
Portable Meters – The meters were read on a weekly basis. The Saratoga nd New Kent meters required some cleaning of the probes.
CC Collection – The pumping stations were visited on a daily basis. We had to make repairs to a lateral on Clover Lane. We found that the lateral settled eight foot out of the manhole.
RC Collection - The Hunt Country pumping station was visited on a routing basis. They called out for a lateral blockage in Bow Tree. They removed three large sticks from the lateral. The last piece that was pulled out sealed the fate of the culprits.
Ridley Creek Plant – They completed the restoration of temporary parking lot.
Lockwood Plant – No problems to report.
Pa One Calls – The Public Works Dept. responded to 60 PA one calls.
Alarms – They responded to 16 alarms during the month of March.
B. Miller Environmental reported:
General:
- Both plants are in compliance.
- Hard copies of the eDMRs were provided to Mark. The Township Manager is listed as a viewer and can see the reports at the website anytime.
Ridley:
- Alum, Alkalinity, and Influent Pump #3 are still not working.
- Telescopic valve on Digester #1 is still an issue.
- Scott has been providing Mark with daily flows
- They may need more Sodium Hypochlorite and Bisulfite for the Nocardia treatment when the alum pumps are operable.
- Wednesday generator switchover still alarms.
Lochwood:
- Bill met with Nancy Sansoni of DEP and went over the details of the new permit; specifically, the provisions of the weekly max and the monthly minimums were addressed. Nancy requested regular influent recordings for the water budget.
- The rest of the issues from last month are still outstanding.
- Don’t get too close to the nesting geese; the males get aggressive!
- The next well sampling event is scheduled for May
The Authority thanked Bill for attending the meeting and told him they would only expect him to come in person when there was a problem to discuss.
13. ANY OTHER MATTER
A. Jack made a motion to authorize Fran to sign the Certification of Officers and Principal Office. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
B. Jack attended the West Goshen meeting. Bob Hoover retired. Jack presented him with a gold plated plunger.
C. Jack asked that those involved in the CHAR items should be acknowledged. Rick will do this.
14. CORRESPONDENCE
A. Rick explained what is being proposed for 1422 Paoli Pike.
MA Minutes 04/11/2011
5
15. PUBLIC COMMENT
None
16. ADJOURNMENT
There being no further business, Jack moved to adjourn the meeting. Fran seconded the motion. The meeting was adjourned at 7:50 p.m. The Authority went into Executive Session until 8:10 pm
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2011\MA 04-11-11 draft.doc
MA Minutes 04/11/2011
6
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 470606
Invoice Date : 04/29/2011
Project : EGMA0809
Project Name : Marydell Diversion Planning
For Services Rendered through: 04/17/2011
Finalize report and submit to Township, agencies, and County.
Phase : 01 -- DEP Coordination
| Total Phase : 01 -- DEP Coordination | Labor : | 1,402.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,402.50 |
Phase : 02 -- Draft Update Revision
| Total Phase : 02 -- Draft Update Revision | Labor : | 3,352.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,352.50 |
Phase : 03 -- Final Update Revision
| Total Phase : 03 -- Final Update Revision | Labor : | 277.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 277.50 |
Phase : 04 -- DEP Approval & Cost Recovery
| Total Phase : 04 -- DEP Approval & Cost Recovery | Labor : | 675.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 675.00 |
Phase : 05 -- Additional Meetings Allowance
| Total Phase : 05 -- Additional Meetings Allowance | Labor : | 450.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 450.00 |
| Amount Due This Invoice | $1,784.25 | |
|---|---|---|
| Fee : | 18,000.00 | |
| Prior Billings : | 16,215.75 | [handwritten: ok RS 5-2-11] |
| Current Billings : | 1,784.25 | |
| Total Billings : | 18,000.00 |
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA0809 -- Marydell Diversion Planning
Invoice # : 470606
...Continued from previous page
Phase : 01 -- DEP Coordination
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Staff Engineer | 16.50 | 85.00 | 1,402.50 |
| Labor Total: | 16.50 | 1,402.50 | |
| Total Phase : 01 -- DEP Coordination | Labor : | $1,402.50 | |
| Expense : | $0.00 |
Phase : 02 -- Draft Update Revision
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 37.25 | 90.00 | 3,352.50 |
| Labor Total: | 37.25 | 3,352.50 | |
| Total Phase : 02 -- Draft Update Revision | Labor : | $3,352.50 | |
| Expense : | $0.00 |
Phase : 03 -- Final Update Revision
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.50 | 105.00 | 157.50 |
| Associate Engineer | 1.50 | 80.00 | 120.00 |
| Labor Total: | 3.00 | 277.50 | |
| Total Phase : 03 -- Final Update Revision | Labor : | $277.50 | |
| Expense : | $0.00 |
Phase : 04 -- DEP Approval & Cost Recovery
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 7.50 | 90.00 | 675.00 |
| Labor Total: | 7.50 | 675.00 | |
| Total Phase : 04 -- DEP Approval & Cost Recovery | Labor : | $675.00 | |
| Expense : | $0.00 |
Phase : 05 -- Additional Meetings Allowance
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 5.00 | 90.00 | 450.00 |
| Labor Total: | 5.00 | 450.00 | |
| Total Phase : 05 -- Additional Meetings Allowance | Labor : | $450.00 | |
| Expense : | $0.00 |
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
Project : EGMA0809 -- Marydell Diversion Planning
Invoice # : 470606
...Continued from previous page
| Total Project : EGMA0809 -- Marydell Diversion Planning | Labor : | $6,157.50 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 3
East Goshen Municipal Authority
EGMA0809 Invoice Summary.xls
Invoice Date 04-29-2011
| Project: | Marydell Pump Station Diversion Project Planning | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 0809 | ||
| Invoice No: | 470606 | ||
| Invoice Period: | 3/21/2011 | to | 4/17/2011 |
| Initial Authorization: | $ 11,500.00 | Date: | 12/8/2008 |
| Changes: | $ 6,500.00 | Date: | 12/14/2009 |
| Contract Amount: | $ 18,000.00 | ||
| Previously Invoiced: | $ 16,215.75 | ||
| Current Invoice: | $ 1,784.25 | ||
| Invoiced to Date ($): | $ 18,000.00 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ - | ||
| Remaining Budget (%): | 0% | ||
Budget by Phase:
| Phase No. | 01 | 02 | 03 | 04 | 05 | 10 |
|---|---|---|---|---|---|---|
| Phase Name: | DEP Coordination |
Draft Update Revision |
Final Update Revision |
DEP Approval & Cost Recovery |
Add'l Meeting Allowance |
Survey of Diversion Sewer |
| Phase Budget: | $ 1,100.00 | $ 5,850.75 | $ 749.25 | $ 642.09 | $ 417.87 | $ 9,240.09 |
| Previously Invoiced: | $ 836.50 | $ 5,850.75 | $ 487.50 | $ - | $ - | $ 6,944.00 |
| Current Invoice: | $ 1,402.50 | $ 3,352.50 | $ 277.50 | $ 675.00 | $ 450.00 | $ 2,097.00 |
| Invoiced to Date ($): | $ 2,239.00 | $ 9,203.25 | $ 765.00 | $ 675.00 | $ 450.00 | $ 9,041.00 |
| Invoiced to Date (%): | 204% | 157% | 102% | 105% | 108% | 98% |
| Remaining Budget ($): | $ (1,139.00) | $ (3,352.50) | $ (15.75) | $ (32.91) | $ (32.13) | $ 199.09 |
| Remaining Budget (%): | -104% | -57% | -2% | -5% | -8% | 2% |
Comments: Finalize report and submit to Township, agencies, anc County.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 470595
Invoice Date : 04/29/2011
Project : EGMA1100
Project Name : 2011 Annual Services
For Services Rendered through: 04/17/2011
RCSTP NPDES permit renewal, February, March and April Authority Meetings.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 3,305.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,305.00 |
| Amount Due This Invoice | $3,305.00 | |
|---|---|---|
| Fee : | 10,000.00 | |
| Prior Billings : | 2,757.50 | |
| Current Billings : | 3,305.00 | |
| Total Billings : | 6,062.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 21.50 | 110.00 | 2,365.00 |
| Project Engineer | 10.00 | 90.00 | 900.00 |
| Associate Engineer | 0.50 | 80.00 | 40.00 |
| Labor Total: | 32.00 | 3,305.00 | |
| Total Phase : **** -- Professional Services | Labor : | $3,305.00 | |
| Expense : | $0.00 | ||
| Total Project : EGMA1100 -- 2011 Annual Services | Labor : | $3,305.00 | |
| Expense : | $0.00 |
[handwritten: ok RS 5-2-11]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1100 Invoice Summary.xlsx
Invoice Date 04-29-2011
| Project: | 2011 Annual Services | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1100 | ||
| Invoice No: | 470595 | ||
| Invoice Period: | 3/21/2011 | to | 4/17/2011 |
| Initial Authorization: | $ 10,000.00 | Date: | 12/13/2010 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 2,757.50 | ||
| Current Invoice: | $ 3,305.00 | ||
| Invoiced to Date ($): | $ 6,062.50 | ||
| Invoiced to Date (%): | 61% | ||
| Remaining Budget ($): | $ 3,937.50 | ||
| Remaining Budget (%): | 39% | ||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2011 Annual Services |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 2,757.50 |
| Current Invoice: | $ 3,305.00 |
| Invoiced to Date ($): | $ 6,062.50 |
| Invoiced to Date (%): | 61% |
| Remaining Budget ($): | $ 3,937.50 |
| Remaining Budget (%): | 39% |
Comments: RCSTP NPDES permit renewal, February, March and April Authority Meetings.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 470596
Invoice Date : 04/29/2011
Project : EGMA1101
Project Name : 2011 Chapter 94 Reporting
For Services Rendered through: 04/17/2011
2011 Chapter 94 Report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 7,902.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 7,902.50 |
| Amount Due This Invoice | $7,902.50 | |
|---|---|---|
| Fee : | 10,000.00 | |
| Prior Billings : | 1,542.50 | |
| Current Billings : | 7,902.50 | |
| Total Billings : | 9,445.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 13.75 | 110.00 | 1,512.50 |
| Project Engineer | 71.00 | 90.00 | 6,390.00 |
| Labor Total: | 84.75 | 7,902.50 | |
| Total Phase : **** -- Professional Services | Labor : | $7,902.50 | |
| Expense : | $0.00 | ||
| Total Project : EGMA1101 -- 2011 Chapter 94 Reporting | Labor : | $7,902.50 | |
| Expense : | $0.00 |
[handwritten: ok RS 5-2-11]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1101 Invoice Summary.xlsx
Invoice Date 4-29-2011
| Project: | 2011 Chapter 94 Reporting | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1101 | ||
| Invoice No: | 470596 | ||
| Invoice Period: | 3/21/2011 | to | 4/17/2011 |
| Initial Authorization: | $ 10,000.00 | Date: | 12/13/2010 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 1,542.50 | ||
| Current Invoice: | $ 7,902.50 | ||
| Invoiced to Date ($): | $ 9,445.00 | ||
| Invoiced to Date (%): | 94% | ||
| Remaining Budget ($): | $ 555.00 | ||
| Remaining Budget (%): | 6% | ||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2011 Chapter 94 Reporting |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 1,542.50 |
| Current Invoice: | $ 7,902.50 |
| Invoiced to Date ($): | $ 9,445.00 |
| Invoiced to Date (%): | 94% |
| Remaining Budget ($): | $ 555.00 |
| Remaining Budget (%): | 6% |
Comments: 2011 Chapter 94 Report.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 470597
Invoice Date : 04/29/2011
Project : EGMA1102
Project Name : 2011 COA Reports
For Services Rendered through: 04/17/2011
March COA Report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 3,725.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,725.00 |
| Amount Due This Invoice | $3,725.00 | |
|---|---|---|
| Fee : | 11,000.00 | |
| Prior Billings : | 535.00 | |
| Current Billings : | 3,725.00 | |
| Total Billings : | 4,260.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.50 | 110.00 | 165.00 |
| Project Engineer | 16.00 | 90.00 | 1,440.00 |
| Associate Engineer | 26.50 | 80.00 | 2,120.00 |
| Labor Total: | 44.00 | 3,725.00 | |
| Total Phase : **** -- Professional Services | Labor : | $3,725.00 | |
| Expense : | $0.00 | ||
| Total Project : EGMA1102 -- 2011 COA Reports | Labor : | $3,725.00 | |
| Expense : | $0.00 |
[handwritten: ok RS 5-2-11]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1102 Invoice Summary.xlsx
Invoice Date 4-29-2011
| Project: | 2011 COA Reports | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1102 | ||
| Invoice No: | 470597 | ||
| Invoice Period: | 3/21/2011 | to | 4/17/2011 |
| Initial Authorization: | $ 11,000.00 | Date: | 12/13/2010 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 530.00 | ||
| Current Invoice: | $ 3,725.00 | ||
| Invoiced to Date ($): | $ 4,255.00 | ||
| Invoiced to Date (%): | 39% | ||
| Remaining Budget ($): | $ 6,745.00 | ||
| Remaining Budget (%): | 61% | ||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2011 COA Reports |
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 535.00 |
| Current Invoice: | $ 3,725.00 |
| Invoiced to Date ($): | $ 4,260.00 |
| Invoiced to Date (%): | 39% |
| Remaining Budget ($): | $ 6,740.00 |
| Remaining Budget (%): | 61% |
Comments: March COA Rport.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | West Chester, PA 19381-0562
(p) 610-696-8225 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
COPY
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
03/31/2011
Client No: 6604-01M
Invoice No. 88001
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 03/14/2011 RFA |
Review packet for Authority meeting of 3/14/11; attend regular meeting of Municipal Authority. | 2.70 | |
| For Current Services Rendered | 2.70 | 513.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.70 | $190.00 | $513.00 |
| Previous Balance | $760.00 |
|---|---|
| Total Current Charges | 513.00 |
| 03/17/2011 Fee Payment | -760.00 |
| Balance Due | $513.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
2011
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
MAY REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/9/11 - Joe - Completed; Need by 5/4/11 - Fran - Completed; Need by 8/3/11 - Jack; Need by 11/2/11 -Dana; February 2012 - Kevin
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Jack; 2 nd Quarter (June) Fran; 3 rd Quarter (September) Dana; 4 th Quarter (December) Joe
- Respond to capacity requests in 45 days or less.
- Implement I & I Plan
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction.
- Invite Board of Supervisors and all other ABC members to tour the plant.
- Open House at the RCSTP
- Have Siemens conduct a training session for Miller and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. Completed 3/29/11
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2011\041111.doc
RESOLUTION 30
OF THE EAST GOSHEN MUNICIPAL AUTHORITY
CHESTER COUNTY, PENNSYLVANIA
A RESOLUTION THAT DECLARES THE OFFICIAL INTENT OF THE EAST GOSHEN MUNICIPAL AUTHORITY (THE “MUNICIPAL AUTHORITY”) TO REIMBURSE EXPENDITURES FOR CERTAIN CAPITAL PROJECTS FROM THE PROCEEDS OF A GUARANTEED REVENUE NOTE (THE “NOTE”) THAT THE MUNICIPAL AUTHORITY EXPECTS TO ISSUE WITHIN THE NEXT TWELVE MONTHS AND THAT DECLARES THE INTENT OF THE MUNICIPAL AUTHORITY TO COMPLY WITH THE REIMBURSEMENT REGULATIONS OF THE INTERNAL REVENUE CODE.
WHEREAS, certain capital projects (the “Project”) consisting of (i) Lochwood Chase Sewer Treatment Plant Elimination Project, (ii) p
Hershey Mill and Reserve Pump Station Diversion Project, (iii) Marydell Pump Station Diversion Project and (v) the payment of the costs of issuance of the Note, will benefit the citizens of the Municipal Authority; and
WHEREAS, the incurrence of non-electoral debt by the Municipal Authority is necessary to fund the Project; and
WHEREAS, the Municipal Authority expects to issue a Guaranteed Revenue Note (the “Note”) within the next twelve (12) months to fund the costs of the Project; and
WHEREAS, the Municipal Authority expects to incur costs of the Project before the issuance of the Note.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF THE EAST GOSHEN MUNICIPAL AUTHORITY, THAT:
This Resolution constitutes a statement of official intent under the Treasury Regulations §1.150-2, T.D. 8476 (the “Reimbursement Regulations”) of the Internal Revenue Code (the
“Code”) to reimburse from the proceeds of the Note the expenditures for the Project, incurred by the Municipal Authority no more than sixty (60) days prior to the adoption of this Resolution and prior to the issuance of the Note. The Municipal Authority reasonably expects to pay costs of the Project from general operating funds prior to the issuance of the Note, and the Municipal Authority reasonably expects to issue the Note. The Municipal Authority does not reasonably expect any source of funds, other than the Note, to be available to pay the costs of the Project. The expectations set forth in this Resolution are consistent with the financial and budgetary circumstances and plans of the Municipal Authority.
The Municipal Authority shall reimburse only expenditures on the Project incurred no more than sixty (60) days prior to the adoption of the Reimbursement Resolution. This limitation shall not apply to the reimbursement of qualified “preliminary expenditures” as defined in the Reimbursement Regulations provided that the amount of preliminary expenditures shall not exceed 20% of the par amount of the Note.
A copy of the text of this Resolution may be examined by any citizen in the office of the Secretary of the Municipal Authority located in the East Goshen Township Municipal Building, 1580 Paoli Pike, West Chester, Pennsylvania 19380, Monday through Friday between the hours of 7:00 A.M. and 5:30 P.M.
All Resolutions or parts of resolutions not in accord with this Resolution are hereby repealed insofar as they conflict herewith.
(Signatures on next page)
2
IN WITNESS WHEREOF, we, the undersigned authorized officials of the East Goshen Municipal Authority, Chester County, Commonwealth of Pennsylvania, have hereunto set our signatures and affixed hereto the Seal of the Municipal Authority.
| Dated: ____________, 2011 | _________________________________ Joseph M. McCawley, Jr. Chairman East Goshen Municipal Authority |
|---|
[Seal]
ATTEST:
_________________________________
Francis X. Beck, Jr.
Secretary
East Goshen Municipal Authority
F:\Data\Shared Data\ABC'S\Municipal Authority\Resolutions\Reimbursement Resolution 30 050911.docx
3
RESOLUTION 30
OF THE EAST GOSHEN MUNICIPAL AUTHORITY
CHESTER COUNTY, PENNSYLVANIA
A RESOLUTION THAT DECLARES THE OFFICIAL INTENT OF THE EAST GOSHEN MUNICIPAL AUTHORITY (THE “MUNICIPAL AUTHORITY”) TO REIMBURSE EXPENDITURES FOR CERTAIN CAPITAL PROJECTS FROM THE PROCEEDS OF A GUARANTEED REVENUE NOTE (THE “NOTE”) THAT THE MUNICIPAL AUTHORITY EXPECTS TO ISSUE WITHIN THE NEXT TWELVE MONTHS AND THAT DECLARES THE INTENT OF THE MUNICIPAL AUTHORITY TO COMPLY WITH THE REIMBURSEMENT REGULATIONS OF THE INTERNAL REVENUE CODE.
WHEREAS, certain capital projects (the “Project”) consisting of (i) Lochwood Chase Sewer Treatment Plant Elimination Project, (ii) p
Hershey Mill and Reserve Pump Station Diversion Project, (iii) Marydell Pump Station Diversion Project and (v) the payment of the costs of issuance of the Note, will benefit the citizens of the Municipal Authority; and
WHEREAS, the incurrence of non-electoral debt by the Municipal Authority is necessary to fund the Project; and
WHEREAS, the Municipal Authority expects to issue a Guaranteed Revenue Note (the “Note”) within the next twelve (12) months to fund the costs of the Project; and
WHEREAS, the Municipal Authority expects to incur costs of the Project before the issuance of the Note.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF THE EAST GOSHEN MUNICIPAL AUTHORITY, THAT:
This Resolution constitutes a statement of official intent under the Treasury Regulations §1.150-2, T.D. 8476 (the “Reimbursement Regulations”) of the Internal Revenue Code (the
“Code”) to reimburse from the proceeds of the Note the expenditures for the Project, incurred by the Municipal Authority no more than sixty (60) days prior to the adoption of this Resolution and prior to the issuance of the Note. The Municipal Authority reasonably expects to pay costs of the Project from general operating funds prior to the issuance of the Note, and the Municipal Authority reasonably expects to issue the Note. The Municipal Authority does not reasonably expect any source of funds, other than the Note, to be available to pay the costs of the Project. The expectations set forth in this Resolution are consistent with the financial and budgetary circumstances and plans of the Municipal Authority.
The Municipal Authority shall reimburse only expenditures on the Project incurred no more than sixty (60) days prior to the adoption of the Reimbursement Resolution. This limitation shall not apply to the reimbursement of qualified “preliminary expenditures” as defined in the Reimbursement Regulations provided that the amount of preliminary expenditures shall not exceed 20% of the par amount of the Note.
A copy of the text of this Resolution may be examined by any citizen in the office of the Secretary of the Municipal Authority located in the East Goshen Township Municipal Building, 1580 Paoli Pike, West Chester, Pennsylvania 19380, Monday through Friday between the hours of 7:00 A.M. and 5:30 P.M.
All Resolutions or parts of resolutions not in accord with this Resolution are hereby repealed insofar as they conflict herewith.
(Signatures on next page)
2
IN WITNESS WHEREOF, we, the undersigned authorized officials of the East Goshen Municipal Authority, Chester County, Commonwealth of Pennsylvania, have hereunto set our signatures and affixed hereto the Seal of the Municipal Authority.
Dated: _______________, 2011
____________________________________
Joseph M. McCawley, Jr.
Chairman
East Goshen Municipal Authority
[Seal]
ATTEST:
____________________________________
Francis X. Beck, Jr.
Secretary
East Goshen Municipal Authority
F:\Data\Shared Data\ABC'S\Municipal Authority\Resolutions\Reimbursement Resolution 30 050911.docx
3
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
May 5, 2011
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Proposal for Professional Services
Lockwood Chase Sewage Treatment Plant Elimination Design & Permitting
Dear Mr. Smith:
Pennoni Associates Inc. is pleased to submit the following proposal for the design, permitting, easements, and bid assistance services associated with the decommissioning of the Lockwood Chase Sewage Treatment Plant (LCSTP).
BACKGROUND
This project has been initiated as a result of the Draft Water Quality Management (WQM) Permit for the LCSTP issued by the Pennsylvania Department of Environmental Protection (PADEP) on February 23, 2007. The Draft Permit requires the Township to: (1) install an influent flow meter to the treatment plant; (2) drill monitoring wells MW-1 and MW-5 deeper; (3) increase the chemical and physical characteristics that the groundwater wells are monitored for; (4) provide a method of measuring the spray volume applied to each spray field/zone; (5) control spray application rates to the rates specified in the permit; (6) verify that the volume of storage in the polishing pond is at least 1.4 million gallons; and (7) improve treated effluent quality.
Pennoni and the Township met with the PADEP following issuance of the Draft Permit to discuss the approach to addressing the new permit requirements. Pennoni prepared the Township Wastewater Needs Evaluation, dated April 16, 2007, and the Lockwood Chase Sewage Treatment Plant Study, dated February 22, 2008. These studies ultimately recommended abandoning the LCSTP and diverting wastewater flows to the West Goshen Service Area via decommissioning of the LCSTP and a gravity sewer extension. Pennoni prepared the Act 537 Plan Update Revision for the Lockwood Chase Sewage Treatment Plant Elimination, last revised June 2010 with a partial supplemental submission to the PADEP on February 17, 2011, which was ultimately approved by the PADEP on March 29, 2011.
Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
May 5, 2011
Page 2
Rick Smith
LCSTP Elimination Design & Permitting
SCOPE OF WORK
The scope of work has been divided into eight phases based upon our expectations for the level of work necessary to obtain permits, prepare easements, and develop bidding documents: Design; Survey; Survey Allocation; NPDES (E&SPC) Permitting; Water Quality Management (WQM) Part 2 Permitting; Environmental; Bid Assistance; and Additional Meetings. The scope does not include any County, State, or other permitting associated with sewer construction in the proximity of a pond, stream, or other water body since such permitting is not anticipated to be required.
Phase 1 – Design
During this phase, Pennoni will prepare the engineering plans and specifications necessary for the decommissioning of the LCSTP and the connection of the Lockwood Chase sewer system to the West Goshen Service Area. The decommissioning plans and specifications will include demolition and removal of structures and equipment, re-grading of the LCSTP site to provide positive drainage, fill and cover of lagoons during re-grading, site stabilization, and erosion and sediment controls.
The routing and connection of the Lockwood Chase sewer system to the West Goshen Service Area will be by gravity to the existing gravity sewer in Tanglewood Drive as proposed in the Act 537 Plan Update Revision for the Lockwood Chase Sewage Treatment Plant Elimination. The plans and specifications will include plans and profiles of the proposed gravity sewer; details of the connections to existing sewers, road and lawn restoration, sewer appurtenances; and erosion and sediment pollution control plans and details.
Preliminary plans and specifications will be prepared for review by the Township. Following Township approval, the plans and specifications will be used for the permit application submissions to the PADEP (WQM Part 2 Permit) and Chester County Conservation District (NPDES Permit and E&SPC Approval).
During the review of the permit applications by the PADEP and County, final plans and specifications will be prepared for bidding and construction.
Phase 2 – Sewer Stakeout and Easements
Pennoni will perform a field survey to stakeout the proposed gravity sewer routing and prepare associated easements. The stakeout will be performed to field verify the constructability of the proposed gravity sewers (e.g. evaluate conflicts with existing trees, landscaping, hardscaping, etc.) and to show property owners the impact of required easements. Pennoni will prepare legal descriptions and exhibits for permanent easements through six properties for the proposed gravity sewer.
Phase 3A – LCSTP Easement & Boundary Survey Allocation
A field survey of the LCSTP property boundaries will be performed to delineate the extents of construction and for preparation of a construction easement. One legal
May 5, 2011
Page 3
Rick Smith
LCSTP Elimination Design & Permitting
description and exhibit for a construction easement on the LCSTP parcel will be prepared.
It is our understanding that the Township has plans of the LCSTP site on file and that it may be possible to utilize those plans instead of performing a full property boundary survey. If existing plans can be used, the amount of time used from this phase budget will be reduced.
Phase 3B – LCSTP Existing Conditions Survey Allocation
An existing conditions ground survey of the LCSTP site and lagoons will be performed to develop existing conditions plans, confirm site grades and lagoon volumes for the re-grading of the site, and estimate sludge quantity to be managed. The extents of the survey will be the anticipated construction disturbance limits on the site only.
It is our understanding that the Township has plans of the LCSTP site on file and that it may be possible to utilize those plans instead of performing a full existing conditions ground survey. If existing plans can be used, the amount of time used from this phase budget will be reduced.
Phase 4 – NPDES (E&SPC) Permitting
During this phase, Pennoni will prepare the application and supporting documents for a National Pollutant Discharge Elimination System (NPDES) Permit and Erosion & Sediment Pollution Control (E&SPC) Approval from the Chester County Conservation District (CCCD). Since there will be more than 1 acre of construction disturbance on the LCSTP parcel, CCCD has informed us that a NPDES Permit will likely be required. The E&SPC Approval is typically issued by the CCCD with the NPDES Permit. Pennoni will attend a pre-application meeting with the CCCD. We will prepare the application forms, E&SPC Narrative, and stormwater design and calculations. The design plans developed in Phase 1 will be submitted with the NPDES and E&SPC applications packages.
Phase 5 – Water Quality Management Part 2 Permitting
During this phase, Pennoni will prepare the application and supporting documents for a Water Quality Management (WQM) Part 2 Permit from the PADEP. The PADEP has informed us that a General WQM Part 2 Permit will likely be required for the proposed sewer extension. The PADEP has no formal application or permitting documents for decommissioning a treatment plant, so they have advised us that it will likely be sufficient to submit the design plans and specifications for the LCSTP decommissioning with the WQM Part 2 Permit application.
Pennoni will attend a pre-application meeting with the PADEP to determine the specific permitting requirements. Based upon the initial guidance we have received from PADEP, this phase will consist of preparation of a General WQM Part 2 Permit application including the General Information Form, Design Engineer's Report, Act 14 Notifications, and Sewer Extensions Module 2 or 17. The design plans and specifications developed in Phase 1 will be submitted with the application package. After a WQM Part
May 5, 2011
Page 4
Rick Smith
LCSTP Elimination Design & Permitting
2 Permit is obtained, we will prepare a letter to PADEP requesting termination of the existing LCSTP Permit.
Phase 6 – Environmental
Two samples of sludge from the treatment lagoon and holding lagoon will be collected and provided to the Township's LCSTP operator for laboratory analysis. Analysis will be for TCLP parameters only to determine if the material is classified as Hazardous Waste. No other environmental investigations, sampling, testing, or remediation design is envisioned to be necessary and is therefore not included in this scope of work.
Phase 7 – Bid Assistance
During this phase, Pennoni will provide assistance to the Township during the construction solicitation period at the hourly rates approved for Pennoni in 2011. The anticipated scope includes: attendance at a pre-bid meeting, preparation of additional bid packages as needed, responding to RFI's, review and tabulation of bids, reference checks, and recommendation of award. This phase is included as an approximated budget.
Phase 8 – Additional Meetings
During this phase, Pennoni will attend meetings as requested by the Township at the hourly rates approved for Pennoni in 2011. Additional meetings may include: public meetings; meetings with property owners about easements; and progress review meetings with the Township, PADEP, CCCD, or other regulatory agencies. The NPDES Permit pre-application meeting with the CCCD and the WQM Part 2 Permit pre-application meeting with the PADEP are not included in this phase, but any follow-up meetings with the agencies will be considered part of this phase. This phase is included as an approximated budget.
May 5, 2011
Page 5
Rick Smith
LCSTP Elimination Design & Permitting
SCHEDULE
We have prepared the Proposed Project Schedule below. The Proposed Project Schedule includes task durations based on our experience and anticipated review times published by PADEP and CCCD. The actual schedule may vary depending on PADEP and CCCD input, scheduling of agency meetings, review comments, etc.
| Contract Day | |
|---|---|
| Notice to Proceed | 1 |
| Preliminary Plans and Specifications | 60 |
| Sewer Stake-out | 60 |
| LCSTP Boundary and Existing Conditions Survey | 60 |
| Easements | 60 |
| Environmental TCLP Testing | 60 |
| Submit NPDES (and E&SPC) Application | 75 |
| Submit WQM Part 2 Permit Application | 75 |
| NPDES Permit Issuance and E&SPC Approval (60 days) | 135 |
| WQM Part 2 Permit Issuance (120 days) | 195 |
| Finalize Plans and Specifications | 195 |
| Advertise Solicitation | 210 |
| Bid Opening | 240 |
FEE
Our estimated fee, to be billed on a time and material basis, is $77,800.00 broken down by Phase as follows:
| Phase 1 – Design | $22,000.00 |
|---|---|
| Phase 2 – Sewer Stakeout and Easements | $9,600.00 |
| Phase 3A – LCSTP Easement &Boundary Survey Allocation | $6,500.00 |
| Phase 3B – LCSTP Existing Conditions Survey Allocation | $16,200.00 |
| Phase 4 – NPDES (E&SPC) Permitting | $7,500.00 |
| Phase 5 – Water Quality Management Part 2 Permitting | $6,000.00 |
| Phase 6 – Environmental | $2,400.00 |
| Phase 7 – Bid Assistance | $6,000.00 |
| Phase 8 – Additional Meetings | $1,600.00 |
| TOTAL | $77,800.00 |
Work shall be done on an hourly basis, billed at the Authority's approved rates for Pennoni for 2011.
Extraordinary expenses, authorized in advance and identifiable to the specific project will be billed in addition to the above stated fees. These expenses include, but are not limited to: permit application fees, Federal Express and delivery charges, and the reproduction of plans and specifications by outside services. We do not bill for such items as relatively small amounts of in-house printing, mailing expenses, reasonable telephone calls, and travel expenses.
May 5, 2011
Page 6
Rick Smith
LCSTP Elimination Design & Permitting
BILLING AND PAYMENT
Fees will be billed monthly based on actual services completed. Payment is due upon receipt of invoice. Billing and Payment shall be in accordance with Item three (3) of the attached General Terms and Conditions.
The client acknowledges that the method of Billing and Payment has been discussed in detail; that the terms agreed upon can only be changed by a written addendum agreed to by both parties; and work may be stopped until payment is made in accordance with the agreement.
TERMS AND CONDITIONS
General
Pennoni Associates Inc. General Terms and Conditions (Form No. LE01, Rev. 09/2002) are attached hereto and are considered as part of this proposal.
Special
- We will perform our work in accordance with accepted engineering standards. However, we cannot guarantee approvals by permitting agencies as these approvals are subject to circumstances beyond our control.
- Revisions to the plans as may be required by personal preferences of reviewers, reviewing agencies, agency consultants, and the client will be performed as additional work on an hourly basis.
- The proposed projects are understood to be clear of rare, threatened, and endangered species as identified by the Pennsylvania Department of Natural Resource Conservation (DCNR) and archeological and historic resources as identified by the Pennsylvania Historic and Museum Commission (PHMC).
- This proposal is limited strictly to those items quoted above. Application fees and other costs payable to regulatory agencies will be the responsibility of the Client.
We appreciate this opportunity to submit our proposal to the Township. Should you have any questions or need additional information, please do not hesitate to call. Please sign and return one (1) copy of this proposal as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
Daniel P. Barbato, P.E.
Authority Engineer
May 5, 2011
Page 7
Rick Smith
LCSTP Elimination Design & Permitting
Enclosures: As Stated
ACCEPTED BY: ___________________________________
___________________________________
(Print Name and Title)
DATE: ___________________________________
P:\Projects\EGMA\EGMA0703 LCSTP Planning\Proposal\Design & Permitting\LCSTP Elimination Design & Permitting PROPOSAL.doc
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
April 15, 2011
EGMA0809
CERTIFIED MAIL/RETURN RECEIPT
Joseph McCawley, Jr., Chairman
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Re: Sewage Facilities Planning Update Revision
Marydell Pump Station Elimination and Diversion
East Goshen Township, Chester County
Dear Mr. McCawley:
On behalf of the East Goshen Municipal Authority, we have prepared the attached Update Revision to the Township's Sewage Facilities Management (Act 537) Plan for the Marydell Pump Station Elimination and Diversion.
This sewer project is the elimination of the Marydell Pump Station, which currently discharges into the Chester Creek sewage collection system (CCCS). The pump station will be replaced with a gravity sewer extension to discharge into the Ridley Creek sewage collection system (RCCS). The sewage being diverted is from existing development, and no new development is proposed with this Update Revision.
The Municipal Authority is required to sign Section K of the Planning Module to certify that the proposed diversions will not cause any system overloads. We have attached the two (2) respective pages from the Planning Module for your signature. Please return the signed pages to me. Should you have any questions, please do not hesitate to contact Mike Ellis in my office or me at (302) 655-4451. We thank you for your prompt attention.
Sincerely,
PENNONI ASSOCIATES INC.
Daniel P. Barbato, P.E.
Authority Engineer
Enclosure
mje/
cc: Rick Smith, Township Manager
P:\Projects\EGMA\EGMA0809 Marydell Planning\Act 537\Component 4 & Notifications\EGMA0809 Municipal Authority LTR.doc
Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
3800-FM-WSFR0353m 10/2005
Marydell Pump Station
address these additional items in terms of any project impacts and measures to avoid or mitigate same.
- Cost Effectiveness
- Air quality
- Floodplains
- Wild and scenic rivers
- Coastal zone management
- Socio-economic impacts
- Water supplies
- Other environmentally sensitive areas
J. ALTERNATIVE SEWAGE FACILITIES ANALYSIS (See Section J of instructions)
[☑] An alternative sewage facilities analysis has been prepared as described in Section J of the instructions and is attached.
The applicant may choose to include additional information beyond that required by Section J of the instructions.
K. CHAPTER 94 CONSISTENCY DETERMINATION (See Section K of instructions)
[☑] Projects that propose the use of existing municipal collection, conveyance or wastewater treatment facilities, or the construction of collection and conveyance facilities to be served by existing municipal wastewater treatment facilities must be consistent with the requirements of Chapter 94 of DEP's rules and regulations (relating to Municipal Wasteload Management). If more than one municipality or authority will be affected by the project, please obtain the information required in this section for each. Additional sheets may be attached for this purpose.
- Project Flows 6975 gpd
- Total Sewage Flows to Facilities Enter average and peak sewage flows for each proposed or existing facility as designed or permitted.; Enter the present average and peak sewage flows for the critical sections of existing facilities.; Enter the average and peak sewage flows projected for 5 years through the critical sections of existing facilities which includes existing, proposed, or future projects.
To complete the table, refer to Section K of instructions.
| a. Design and/or Permitted Capacity (gpd) | b. Present Flows (gpd) | c. Projected Flows in 5 years (gpd) | ||||
|---|---|---|---|---|---|---|
| Average | Peak | Average | Peak | Average | Peak | |
| Collection(1) | 222,030 | 888,121 | 119,130 | 293,289 | 203,729(2) | 519,594(2) |
| Conveyance(3) | 475,942 | 1,903,769 | 245,685 | 1,060,706 | 341,013(5) | 1,316,273(5) |
| Treatment(4) | 750,000 | 3,000,000 | 269,000 | 1,141,300 | 364,328(5) | 1,396,867(5) |
Refer to attached Section K Narrative for a more detailed explanation of these flow figures.
(1) Collection = Most restrictive gravity sewer run in the collection system downstream of the proposed Marydell Diversion tie-in; the peak capacity is per the 2009 Ridley Creek Collection System Hydraulic Characterization (sewer modeling), and the average capacity is calculated based on a conservative 4.0 peaking factor. Present average and peak flows are also obtained from 2009 Ridley Creek Collection System Hydraulic Characterization (sewer modeling).
(2) Projected Flows: Average = Present Flow + Marydell Diversion + Hershey Mill Diversion (64,275 avg. gpd) – Reserve PS Diversion (5,886 avg. gpd) + Lockwood Chase Diversion (18,400 avg. gpd) + 5 additional projected connections @ 167 gpd/EDU; Peak = Present Flow + 5.0 × Marydell Diversion + Hershey Mill Diversion (124,380 peak gpd) – Reserve PS Diversion (9,890 peak gpd) + 4.0 × Lockwood Chase Diversion + 4.0 × 5 additional connections. Flows are from applicable 2009 Chapter 94 Reports. Conservative 4.0 and 5.0 peak factors are used where no peak meter data is available.
(3) Conveyance = Ridley Creek Interceptor (most restrictive gravity sewer run); the peak capacity is per the 2009 Ridley Creek Collection System Hydraulic Characterization (sewer modeling), and the average capacity is calculated based on a conservative 4.0 peaking factor. Present average and peak flows are also obtained from 2009 Ridley Creek Collection System Hydraulic Characterization (sewer modeling).
(4) Treatment = RCSTP (after expansion); Average present flow is per the 2009 Chapter 94 Report, and Peak present flow is the peak daily influent as reported in the 2009 Discharge Monitoring Reports (DMRs).
(5) Projected Flows assume the Marydell Diversion, Hershey Mill Diversion, Reserve PS Diversion, and Lockwood Chase Diversion are completed during the 5-year projection period; Projected Flows also include 34 other connections projected in the 2009 Chapter 94 Report.
- Collection and Conveyance Facilities The questions below are to be answered by the sewer authority, municipality, or agency responsible for completing the Chapter 94 report for the collection and conveyance facilities. These questions should be
- 5 -
3800-FM-WSFR0353m 10/2005
Marydell Pump Station
answered in coordination with the latest Chapter 94 annual report and the above table.
This project proposes sewer extensions or tap-ins. Will these actions create a hydraulic overload within five years on any existing collection or conveyance facilities that are part of the system? [☐] Yes [☑] No
- If yes, this sewage facilities planning module will not be accepted for review by the municipality, delegated local agency and/or DEP until all inconsistencies with Chapter 94 are resolved or unless there is an approved plan and schedule granting an allocation for this project. A letter granting allocations to this project under the plan and schedule must be attached to the module package.
- If no, the sewer authority, municipality, or agency responsible for completing the Chapter 94 report for the collection and conveyance facilities must sign below to indicate that the collection and conveyance facilities have adequate capacity and are able to provide service to the proposed development in accordance with Chapter 94 requirements and that this proposal will not affect this status.
- Collection System Name of Agency, Authority, Municipality East Goshen Municipal Authority Name of Responsible Agent Joseph M. McCawley, Jr., Chairman Agent Signature ________________________________________________________________________________ Date ________________________________________
- Conveyance System Name of Agency, Authority, Municipality East Goshen Municipal Authority Name of Responsible Agent Joseph M. McCawley, Jr., Chairman Agent Signature ________________________________________________________________________________ Date ________________________________________
K. CHAPTER 94 CONSISTENCY DETERMINATION (continued)
- Treatment Facility The questions below are to be answered by the facility permittee in coordination with the information in the table and the latest Chapter 94 report. This project proposes the use of an existing wastewater treatment plant for the disposal of sewage. Will this action create a hydraulic or organic overload within 5 years at that facility? [☐] Yes [☑] No If yes, this planning module for sewage facilities will not be reviewed by the municipality, delegated local agency and/or DEP until this inconsistency with Chapter 94 is resolved or unless there is an approved plan and schedule granting an allocation for this project. A letter granting allocations to this project under the plan and schedule must be attached to the planning module.; If no, the treatment facility permittee must sign below to indicate that this facility has adequate treatment capacity and is able to provide wastewater treatment services for the proposed development in accordance with Chapter 94 requirements and that this proposal will not impact this status; Name of Agency, Authority, Municipality East Goshen Municipal Authority Name of Responsible Agent Joseph M. McCawley, Jr., Chairman Agent Signature ________________________________________________________________________________ Date ________________________________________
L. INSTITUTIONAL EVALUATION (See Section L of instructions)
[☑] An institutional evaluation is attached. Identify the entity which will design, obtain necessary permits, construct, own and operate the proposed facilities. If a low pressure vacuum or effluent sewer are proposed, discuss purchase, installation, operation and maintenance responsibilities for the individual pumping, valves, tanks, etc.
- 6 -
2008 FLOWMETERS
2011 APRIL 2ND QUARTER
| Precip | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | NET | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Inches | DATE | READING | GPD | READING | GPD | READING | GPD | READING | GPD | GPD | FLOWS |
| 0.18 | 04/01/11 | 2,031,530 | 1,299,000 | 18,093,940 | 146,410 | 9,600,448 | 73,230 | 11,276,219 | 64,230 | 20,400 | 1,015,130 |
| 0.00 | 04/02/11 | 20,400 | 0 | ||||||||
| 0.05 | 04/03/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/04/11 | 2,035,545 | 1,338,333 | 18,140,652 | 155,707 | 9,620,747 | 67,663 | 11,289,594 | 44,583 | 20,400 | 1,070,380 |
| 0.14 | 04/05/11 | 2,036,857 | 1,312,000 | 18,155,261 | 146,090 | 9,626,080 | 53,330 | 11,296,194 | 66,000 | 20,400 | 1,046,580 |
| 0.00 | 04/06/11 | 2,038,193 | 1,336,000 | 18,170,030 | 147,690 | 9,631,540 | 54,600 | 11,302,999 | 68,050 | 20,400 | 1,065,660 |
| 0.00 | 04/07/11 | 2,039,480 | 1,287,000 | 18,184,089 | 140,590 | 9,636,809 | 52,690 | 11,309,355 | 63,560 | 20,400 | 1,030,160 |
| 0.72 | 04/08/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/09/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/10/11 | 20,400 | 0 | ||||||||
| 0.05 | 04/11/11 | 2,044,847 | 1,341,750 | 18,247,965 | 159,690 | 9,659,109 | 55,750 | 11,330,038 | 51,708 | 20,400 | 1,074,603 |
| 0.87 | 04/12/11 | 2,046,181 | 1,334,000 | 18,263,253 | 152,880 | 9,666,151 | 70,420 | 11,336,743 | 67,050 | 20,400 | 1,043,650 |
| 0.10 | 04/13/11 | 2,047,746 | 1,565,000 | 18,283,156 | 199,030 | 9,674,773 | 86,220 | 11,344,157 | 74,140 | 20,400 | 1,205,610 |
| 0.00 | 04/14/11 | 2,049,255 | 1,509,000 | 18,301,349 | 181,930 | 9,681,969 | 71,960 | 11,350,974 | 68,170 | 20,400 | 1,186,940 |
| 0.00 | 04/15/11 | 2,050,684 | 1,429,000 | 18,318,111 | 167,620 | 9,688,953 | 69,840 | 11,357,475 | 65,010 | 20,400 | 1,126,530 |
| 1.62 | 04/16/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/17/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/18/11 | 20,400 | 0 | ||||||||
| 0.15 | 04/19/11 | 2,057,454 | 1,692,500 | 18,399,723 | 204,030 | 9,720,278 | 78,313 | 11,379,299 | 54,560 | 20,400 | 1,355,598 |
| 0.00 | 04/20/11 | 2,058,968 | 1,514,000 | 18,416,553 | 168,300 | 9,727,826 | 75,480 | 11,385,794 | 64,950 | 20,400 | 1,205,270 |
| 0.00 | 04/21/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/22/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/23/11 | 20,400 | 0 | ||||||||
| 0.55 | 04/24/11 | 20,400 | 0 | ||||||||
| 0.00 | 04/25/11 | 2,066,164 | 1,439,200 | 18,500,100 | 167,094 | 9,760,985 | 66,318 | 11,411,363 | 51,138 | 20,400 | 1,154,650 |
| 0.00 | 04/26/11 | 2,067,625 | 1,461,000 | 18,516,542 | 164,420 | 9,769,173 | 81,880 | 11,418,174 | 68,110 | 20,400 | 1,146,590 |
| 0.03 | 04/27/11 | 2,069,029 | 1,404,000 | 18,532,189 | 156,470 | 9,776,927 | 77,540 | 11,425,255 | 70,810 | 20,400 | 1,099,180 |
| 0.14 | 04/28/11 | 2,070,403 | 1,374,000 | 18,547,180 | 149,910 | 9,784,735 | 78,080 | 11,432,569 | 73,140 | 20,400 | 1,072,870 |
| 0.00 | 04/29/11 | 2,071,791 | 1,388,000 | 18,562,922 | 157,420 | 9,792,442 | 77,070 | 11,439,988 | 74,190 | 20,400 | 1,079,320 |
| 0.00 | 04/30/11 | 20,400 | 0 | ||||||||
| 4.60 | 1,413,164 | 162,664 | 70,023 | 64,082 | 1,176,708 | ||||||
| MONTH TO DATE | E.GOSHEN | ||||||||||
| NORMAL MONTH TO DATE | |||||||||||
| YEAR TO DATE | |||||||||||
| NORMAL YEAR TO DATE | |||||||||||
2011 flowmeters -all-stations separate month worksheets.xlsAPR
5/2/201110:00 AM
2008 FLOWMETERS
2011 APRIL 2ND QUARTER
| HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | SHERMAN | BARKWAY | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| DATE | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 04/01/11 | 20,778,171 | 72,840 | 1,074,141 | 93,200 | 217,181 | 341,740 | 119,869,546 | 839,580 | 539,560 | 5,600 | 1,900,727 | 11,470 |
| 04/02/11 | ||||||||||||
| 04/03/11 | ||||||||||||
| 04/04/11 | 20,800,003 | 72,773 | 1,077,061 | 97,333 | 309,744 | 308,543 | 120,120,071 | 835,083 | 541,370 | 6,033 | 1,904,710 | 13,277 |
| 04/05/11 | 20,806,559 | 65,560 | 1,077,991 | 93,000 | 344,140 | 343,960 | 120,204,085 | 840,140 | 541,920 | 5,500 | 1,905,866 | 11,560 |
| 04/06/11 | 20,813,287 | 67,280 | 1,078,894 | 90,300 | 380,638 | 364,980 | 120,290,792 | 867,070 | 542,512 | 5,920 | 1,906,999 | 11,330 |
| 04/07/11 | 20,819,898 | 66,110 | 1,079,757 | 86,300 | 415,943 | 353,050 | 120,374,509 | 837,170 | 543,138 | 6,260 | 1,908,079 | 10,800 |
| 04/08/11 | ||||||||||||
| 04/09/11 | ||||||||||||
| 04/10/11 | ||||||||||||
| 04/11/11 | 20,847,187 | 68,223 | 1,083,594 | 95,925 | 541,155 | 313,030 | 120,713,528 | 847,548 | 545,538 | 6,000 | 1,913,046 | 12,418 |
| 04/12/11 | 20,853,580 | 63,930 | 1,084,500 | 90,600 | 576,259 | 351,040 | 120,800,104 | 865,760 | 546,133 | 5,950 | 1,914,263 | 12,170 |
| 04/13/11 | 20,860,651 | 70,710 | 1,085,695 | 119,500 | 615,986 | 397,270 | 120,900,099 | 999,950 | 546,730 | 5,970 | 1,915,441 | 11,780 |
| 04/14/11 | 20,867,777 | 71,260 | 1,086,827 | 113,200 | 654,480 | 384,940 | 120,998,672 | 985,730 | 547,300 | 5,700 | 1,916,509 | 10,680 |
| 04/15/11 | 20,874,500 | 67,230 | 1,087,852 | 102,500 | 691,136 | 366,560 | 121,091,449 | 927,770 | 547,871 | 5,710 | 1,917,680 | 11,710 |
| 04/16/11 | ||||||||||||
| 04/17/11 | ||||||||||||
| 04/18/11 | ||||||||||||
| 04/19/11 | 20,909,188 | 86,720 | 1,093,784 | 148,300 | 845,078 | 384,855 | 121,510,018 | 1,046,423 | 550,245 | 5,935 | 1,923,530 | 14,625 |
| 04/20/11 | 20,917,766 | 85,780 | 1,095,042 | 125,800 | 883,544 | 384,660 | 121,607,253 | 972,350 | 550,880 | 6,350 | 1,924,761 | 12,310 |
| 04/21/11 | ||||||||||||
| 04/22/11 | ||||||||||||
| 04/23/11 | ||||||||||||
| 04/24/11 | ||||||||||||
| 04/25/11 | 20,958,179 | 80,826 | 1,100,926 | 117,680 | 1,048,131 | 329,174 | 122,066,456 | 918,406 | 553,491 | 5,222 | 1,931,078 | 12,634 |
| 04/26/11 | 20,965,934 | 77,550 | 1,102,055 | 112,900 | 1,087,747 | 396,160 | 122,162,895 | 964,390 | 554,087 | 5,960 | 1,932,322 | 12,440 |
| 04/27/11 | 20,973,174 | 72,400 | 1,103,132 | 107,700 | 1,129,031 | 412,840 | 122,254,980 | 920,850 | 554,656 | 5,690 | 1,933,492 | 11,700 |
| 04/28/11 | 20,980,049 | 68,750 | 1,104,149 | 101,700 | 1,160,329 | 312,980 | 122,345,622 | 906,420 | 555,180 | 5,240 | 1,934,664 | 11,720 |
| 04/29/11 | 20,986,993 | 69,440 | 1,105,187 | 103,800 | 1,197,441 | 371,120 | 122,437,880 | 922,580 | 555,791 | 6,110 | 1,935,931 | 12,670 |
| 04/30/11 | ||||||||||||
| 72,199 | 105,867 | 359,818 | 911,601 | 5,832 | 12,076 | |||||||
2011 flowmeters -all-stations separate month worksheets.xlsAPR
5/2/201110:00 AM
2011 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,081,404 | 97,651 | 47,105 | 57,700 | 20,400 | 53,493 | 62,585 | 278,133 | 701,586 | 5,463 | 11,131 |
| FEBRUARY | 1,292,596 | 149,342 | 63,312 | 71,587 | 20,400 | 58,624 | 77,370 | 309,956 | 793,370 | 5,474 | 11,651 |
| MARCH | 1,481,027 | 147,579 | 69,796 | 65,367 | 20,400 | 88,101 | 116,511 | 298,938 | 943,470 | 5,812 | 13,905 |
| APRIL | 1,413,164 | 162,664 | 70,023 | 64,082 | 20,400 | 72,199 | 105,867 | 359,818 | 911,601 | 5,832 | 12,076 |
| MAY | |||||||||||
| JUNE | |||||||||||
| JULY | |||||||||||
| AUGUST | |||||||||||
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,317,048 | 139,309 | 62,559 | 64,684 | 20,400 | 68,104 | 90,583 | 311,711 | 837,507 | 5,645 | 12,191 |
To West Goshen: 1,050,496
2011 flowmeters -all-stations separate month worksheets.xlsSUMMARY
April Precip. 4.60 - 2011
April
precip.
5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
snow/rain
Monthly Totals 2011 (Jan-Dec)
Monthly Totals
Precip.
6 5 4 3 2 1 0
1 2 3 4
Month
Flowmeters April 2011
April
Flow#s
1600000 1400000 1200000 1000000 800000 600000 400000 200000 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Day of the Month
Monthly Totals 2010 Jan-Dec
Flowmeters
2500000 2000000 1500000 1000000 500000 0
January February March April May June July August September October November December
Month
MILLER ENVIRONMENTAL, INC.
The Water and Wastewater Authority®
8 April 2011
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Attn: Rick Smith, Township Manager
Re: Monthly Operations Report- April 2011
Dear Mr. Smith:
For the month of March, we have the following operations activity to report:
General.
- Both Plants are in compliance.
- Hard copies of the eDMRs were provided to Mark; Township Manager is listed as a viewer and can see the reports at the web site anytime.
Ridley.
- Alum, Alkalinity, and Influent Pump #3 are still not working.
- Telescopic valve on Digester # 1 still an issue.
- Scott has been providing Mark with daily flows.
- We may need more Sodium Hypochlorite and Bisulfite for the Nocardia treatment when the alum pumps are operable.
- Wednesday Generator switchover still alarms.
Lockwood.
- Bill met with Nancy Sansoni of DEP and went over the details of the new permit: Specifically, the provisions of the weekly max and the monthly minimums were addressed; Nancy requested regular influent recordings for the water budget.
- The rest of the issues from last month are still outstanding.
- Don't get too close to the nesting geese; the males get aggressive!
- The next well sampling event is scheduled for May.
Thank you,
MILLER ENVIRONMENTAL INC.
William Ronyack
Operations Manager
320 S. 17TH STREET • READING, PA 19602 • (P) 610.376.9162 • (F) 610.376.9164
MILLER ENVIRONMENTAL, INC.
The Water and Wastewater Authority®
5 May 2011
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Attn: Rick Smith, Township Manager
Re: Monthly Operations Report- May 2011
Dear Mr. Smith:
For the month of April, we have the following operations activity to report:
General.
- Aqua continues to work on Norcardia removal
- MEI & Pennoni are schedule to meet and recommend a plan for dealing with old sludge
- Scott T. is working on filter feed #2 alarm
- 2 UV Low/Low alarms on 5/5; SBR #4 turbs.
- Plant is recovering from early April solids loss. Exact cause undetermined
- Owners/Operators/Engineers/Contractors met to discuss ongoing issues
- No new issues at Lochwood
Attachments.
- March eDMRs (2)
Thank you,
MILLER ENVIRONMENTAL INC.
William Ronyack
Operations Manager
(SENT VIA EMAIL)
CC: Mark Miller, Director of Public Works
Scott Stump, MEI
320 S. 17TH STREET • READING, PA 19602 • (P) 610.376.9162 • (F) 610.376.9164
Page 1 of 2
Pennsylvania Department of Environment Protection Discharge Monitoring Report (DMR)
| FACILITY: | LOCHWOOD CHASE STP & SPRAY SYS | PERMIT NUMBER: | 1580430 | REGION: | EP SE Rgnl Off |
|---|---|---|---|---|---|
| PERMITTEE: | EAST GOSHEN TWP MUNI AUTH CHESTER CNTY | OUTFALL: | 001 | COUNTY: CITY: |
Chester WEST CHESTER |
| ADDRESS: | 1580 PAOLI PIKE WEST CHESTER, PA 19380-6107 |
MONITORING PERIOD: | From: 2011-03-01 To: 2011-03-31 |
NO DISCHARGE FROM SITE: | ( ) |
| Parameter | Quantity or Loading | Units | Quality or Concentration | Units | No. Ex. | Frequency of Analysis | Sample Type | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Value | Value | Value | Value | Value | |||||||
| pH Parameter Code 00400 Stage Code 1 |
Sample Measurement | ****** | ****** | 6.1 | ****** | 6.1 | S.U. | 0 | 1/month | Grab | |
| Permit Requirement | ****** | ****** | 6.0 Minimum |
****** | 9.0 Maximum |
1/month | Grab | ||||
| Total Suspended Solids Parameter Code 00530 Stage Code 1 |
Sample Measurement | ****** | ****** | ****** | 15.2 | 15.2 | mg/L | 0 | 1/month | Grab | |
| Permit Requirement | ****** | ****** | ****** | 30 Average Monthly |
45 Weekly Average |
1/month | Grab | ||||
| Total Nitrogen Parameter Code 00600 Stage Code 1 |
Sample Measurement | ****** | ****** | ****** | 30.7 | 30.7 | mg/L | 0 | 1/month | Grab | |
| Permit Requirement | ****** | ****** | ****** | Report Average Monthly |
Report Instantaneous Maximum |
1/month | Grab | ||||
| Flow (mgd) Parameter Code 50050 Stage Code G |
Sample Measurement | 0.0299 | ****** | MGD | ****** | ****** | ****** | 0 | Continuous | Recorded | |
| Permit Requirement | 0.0252 Average Monthly |
****** | ****** | ****** | ****** | Continuous | Recorded | ||||
| Fecal Coliform Parameter Code 74055 Stage Code 1 |
Sample Measurement | ****** | ****** | ****** | 8400 | ****** | CFU/100 ml | 1 | 1/month | Grab | |
| Permit Requirement | ****** | ****** | ****** | 200 Geometric Mean |
****** | 1/month | Grab | ||||
| CBOD5 Parameter Code 80082 Stage Code 1 |
Sample Measurement | ****** | ****** | ****** | 41 | 41 | mg/L | 1 | 1/month | Grab | |
| Permit Requirement | ****** | ****** | ****** | 25 Average Monthly |
40 Weekly Average |
1/month | Grab | ||||
| Name/Title of Principal Executive Officer Or Authorized Agent | I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification). | Signature of Principal Executive Officer Or Authorized Agent | Telephone No. | Date 2011-04-28 |
|---|
Report all violations during the reporting period on a Non-Compliance Reporting Form, as an attachment to your eDMR submission. Page 1
http://www.ahs2.dep.state.pa.us/e2/Pages/ReportManage/DisplaySubReport.ashx?subid=1... 4/28/2011
Page 1 of 3
Pennsylvania Department of Environment Protection Discharge Monitoring Report (DMR)
FACILITY: RIDLEY CREEK STP
PERMITTEE: EAST GOSHEN TWP MUNI AUTH CHESTER CNTY
ADDRESS: 1751 TOWNE DR
WEST CHESTER, PA 19380
PERMIT NUMBER: PA0050504
OUTFALL: 001
MONITORING PERIOD: From: 2011-03-01 To: 2011-03-31
REGION: EP SE Rgnl Off
COUNTY: Chester
CITY: WEST CHESTER
NO DISCHARGE FROM SITE: ( )
| Parameter | Quantity or Loading | Quality or Concentration | Units | No. Ex. | Frequency of Analysis | Sample Type | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Value | Value | Units | Value | Value | Value | ||||||
| Dissolved Oxygen Parameter Code: 00300 Stage Code: 1 |
Sample Measurement | 6.35 | 8.74 | mg/L | 0 | 1/day | Grab | ||||
| Permit Requirement | 5.0 Instantaneous Minimum | Report Average Monthly | 1/day | Grab | |||||||
| pH Parameter Code: 00400 Stage Code: 1 |
Sample Measurement | 6.7 | 12.4 | S.U. | 1 | 1/day | Grab | ||||
| Permit Requirement | 6.0 Instantaneous Minimum | 9.0 Instantaneous Maximum | 1/day | Grab | |||||||
| Total Suspended Solids Parameter Code: 00530 Stage Code: 1 |
Sample Measurement | 13.344 | 13.344 | lbs/day | 4 | 4 | mg/L | 0 | 1/week | 24-Hr Composite | |
| Permit Requirement | 100 Average Monthly | 150 Weekly Average | 30 Average Monthly | 45 Weekly Average | 1/week | 24-Hr Composite | |||||
| Ammonia-Nitrogen Parameter Code: 00610 Stage Code: 1 |
Sample Measurement | 2.04 | lbs/day | 0.612 | mg/L | 0 | 1/week | 24-Hr Composite | |||
| Permit Requirement | 40 Average Monthly | 12 Average Monthly | 1/week | 24-Hr Composite | |||||||
| Flow (mgd) Parameter Code: 50050 Stage Code: 1 |
Sample Measurement | .4 | 1.0 | MGD | 0 | Continuous | Metered | ||||
| Permit Requirement | Report Average Monthly | Report Daily Maximum | Continuous | Metered | |||||||
| Fecal Coliform Parameter Code: 74055 Stage Code: 1 |
Sample Measurement | 11.49 | 20 | CFU/100 ml | 0 | 1/week | Grab | ||||
| Permit Requirement | 200 Geometric Mean | 1000 Instantaneous Maximum | 1/week | Grab | |||||||
| CBOD5 Parameter Code: 80082 Stage Code: 1 |
Sample Measurement | 10.008 | 10.008 | lbs/day | 3 | 3 | mg/L | 0 | 1/week | 24-Hr Composite | |
| Permit Requirement | 67 Average Monthly | 100 Weekly Average | 20 Average Monthly | 30 Weekly Average | 1/week | 24-Hr Composite | |||||
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
| Name/Title of Principal Executive Officer Or Authorized Agent | Signature of Principal Executive Officer Or Authorized Agent | Telephone No. | Date |
|---|---|---|---|
| [illegible] | [Signed] | 2011-04-27 |
Report all violations during the reporting period on a Non-Compliance Reporting Form, as an attachment to your eDMR submission. Page 1
Pennsylvania Department of Environment Protection Discharge Monitoring Report (DMR)
FACILITY: RIDLEY CREEK STP
PERMIT NUMBER: PA0050504
REGION: EP SE Rgnl Off
http://www.ahs2.dep.state.pa.us/e2/Pages/ReportManage/DisplaySubReport.ashx?subid=1... 4/28/2011
Page 2 of 3
PERMITTEE: EAST GOSHEN TWP MUNI AUTH CHESTER CNTY
ADDRESS: 1751 TOWNE DR
WEST CHESTER, PA 19380
OUTFALL: 002
MONITORING PERIOD: From: 2011-03-01 To: 2011-03-31
COUNTY: Chester
CITY: WEST CHESTER
NO DISCHARGE FROM SITE: ( X )
| Parameter | Quantity or Loading | Quality or Concentration | Units | No. Ex. | Frequency of Analysis | Sample Type | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Value | Value | Units | Value | Value | Value | ||||||
| Dissolved Oxygen Parameter Code: 00300 Stage Code: 1 |
Sample Measurement | mg/L | |||||||||
| Permit Requirement | 5.0 Instantaneous Minimum | Report Average Monthly | 1/day | Grab | |||||||
| pH Parameter Code: 00400 Stage Code: 1 |
Sample Measurement | S.U. | |||||||||
| Permit Requirement | 6.0 Instantaneous Minimum | 9.0 Instantaneous Maximum | 1/day | Grab | |||||||
| Total Suspended Solids Parameter Code: 00530 Stage Code: 1 |
Sample Measurement | mg/L | |||||||||
| Permit Requirement | 30 Average Monthly | 45 Weekly Average | 1/week | Composite | |||||||
| Ammonia-Nitrogen Parameter Code: 00610 Stage Code: 1 |
Sample Measurement | mg/L | |||||||||
| Permit Requirement | 12.0 Average Monthly | 1/week | 24-Hr Composite | ||||||||
| Flow (mgd) Parameter Code: 50050 Stage Code: 1 |
Sample Measurement | MGD | |||||||||
| Permit Requirement | Report Average Monthly | Report Daily Maximum | Continuous | Metered | |||||||
| Fecal Coliform Parameter Code: 74055 Stage Code: 1 |
Sample Measurement | CFU/100 mL | |||||||||
| Permit Requirement | 200 Geometric Mean | 1/week | Grab | ||||||||
| CBOD5 Parameter Code: 80082 Stage Code: 1 |
Sample Measurement | mg/L | |||||||||
| Permit Requirement | 20 Average Monthly | 30 Weekly Average | 1/week | 24-Hr Composite | |||||||
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
| Name/Title of Principal Executive Officer Or Authorized Agent | Signature of Principal Executive Officer Or Authorized Agent | Telephone No. | Date |
|---|---|---|---|
| [illegible] | [Signed] | 2011-04-27 |
Report all violations during the reporting period on a Non-Compliance Reporting Form, as an attachment to your eDMR Page 2
http://www.ahs2.dep.state.pa.us/e2/Pages/ReportManage/DisplaySubReport.ashx?subid=1... 4/28/2011
Page 2 of 2
GENERAL REPORT COMMENT:
The non-compliance issues are due to disinfection or lack of and also operator error confusion as to what a week-week was considered by the department for spraying to the spray fields.
PARAMETER SPECIFIC COMMENTS:
| 270173 | Fecal Coliform | Concentration Avg: | disinfection is being modified |
|---|---|---|---|
| Concentration Avg: | disinfection is being modified | ||
| 270173 | CBOD5 | Concentration Max: | disinfection is being modified |
| 270173 | Flow (mgd) | Loading Avg: | operator error |
http://www.ahs2.dep.state.pa.us/e2/Pages/ReportManage/DisplaySubReport.ashx?subid=1... 4/28/2011
RECEIVED
BY
APR 1 9 2011
To: Louis F. Smith, Township Manager
From: Rita F. Hartleroad
Date: April 17, 2011
Dear Mr. Smith
During the past three months we had a sewer problem that caused the laundry room and bathroom of our home to be flooded twice. The first time was on New Year's Day at a time when families are gathered together to celebrate the New Year. In desperation we called Supervisor Thomas Clapper who called Mark Miller, who did not hesitate in sending some men immediately.
The second time was 10 P.M. at night and again Thomas Clapper and his wife Irene were right there directing us to Mark Miller. Kudos to both men!
I cannot say enough about Mark Miller and the men who helped him. They were there unplugging the problem within an hour and returned the next day to do a thorough exam of the sewer line resulting in a major fix to the problem. Mr. Miller and his men are professional, kind and the Township should be very proud of them.
Frank and I both want to thank you and the township for taking care of the problem. We have lived in the township for over 37 years and are proud to say that when in a time of need, received an immediate response and a long term fix of the problem.
Rita F. Hartleroad
Rita F. Hartleroad
Cc. Thomas Clapper
Cc. Mark Miller
DAN TRUITT, MEMBER
156th LEGISLATIVE DISTRICT
DISTRICT OFFICE:
21 South Church Street, 1st Floor
West Chester, PA 19382
Phone: (610) 696-4990
Fax: (610) 738-2163
House of Representatives
Commonwealth of Pennsylvania
Harrisburg
COMMITTEES:
Commerce
Local Government
Urban Affairs
Education
E-mail: dtruitt@pahousegop.com
Web: RepTruitt.com
April 25, 2011
Louis F. Smith
1580 Paoli Pike
West Chester, PA 19380
Dear Rick,
Thank you for your letter asking for me to support House Bill 294 and House Bill 1191. I appreciate you informing me of the East Goshen Municipal Authority's opinion on upcoming legislation.
I would like to inform you that I am a co-sponsored for House Bill 294. I also voted yes on House Bill 294 when it came before the House on April 13, 2011 and it will be referred to a Senate Committee when they reconvene on April 26, 2011. House Bill 1191 is currently in the House Labor and Industry Committee. Should it come before the House for a vote, I currently plan to vote for it in its current form.
Once again, thank you for keeping me informed of the East Goshen Municipal Authority's opinion on upcoming legislation. You may follow the progress of House Bill 294 and House Bill 1191 or any other legislation of interest in either the House of Representatives or Senate by visiting the General Assembly's website at www.legis.state.pa.us. Please don't hesitate to contact my office should you have any further questions or concerns with regard to state government matters. Hope all is well. I look forward to seeing you at a township meeting in the near future.
Respectfully yours,
Dan Truitt
Dan Truitt
State Representative
156th Legislative District
RECEIVED
BY: ___________
APR 2 6 2011
DRAFT
May 5, 2011
Mr. Mark Turner:
15 Fox Ridge Drive
Malvern, PA 19355
Dear Mr. Turner:
The East Goshen Municipal Authority has completed the project to upgrade the Ridley Creek Sewer Plant. On behalf of the Municipal Authority and the residents I would like to thank you for allowing us to utilize a portion of your property at 1755 Towne Drive as a parking area. The final restoration of your property should be competed within the next two weeks.
The utilization of your property definitely made the construction process easier and eliminated the need for the contractors to park on the street which would have impacted the residents who live adjacent to sewer plant.
In recognition of your generosity in allowing us to use your property the Municipal Authority has agreed to waive the sewer tapping fee in the event you or your successor and assigns decide to build a house on your property and want to connect it to the public sewer system.
Sincerely,
Joseph McCawley
Chairman
F:\Data\Shared Data\Property Management\53-4\53-4-134.5 (1755 Towne Drive)\Letter re Parking Area and Tapping Fee.doc