Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
July 11, 2011
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Miller Environmental, Inc. Monthly Operations Report for June; Cost Summary Report; Change Orders – None
- RIDLEY CREEK INVOICES a. William H. Clinger, Corp. W.O.#2770 $ 2,890.00 b. William H. Clinger, Corp. W.O.#2775 $ 631.43 c. Ryerson #93064709 $ 2,839.39 d. Grainger #9559020087 $ 1,968.46 e. Gawthrop, Greenwood #89644 $ 1,159.00 f. Gawthrop, Greenwood #89645 $ 315.00 g. Aqua Wastewater #123232 $ 6,169.22 h. Rumsey #S3727010.001 $ 2,100.00
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES June 13, 2011
- APPROVAL OF INVOICES a. Gawthrop, Greenwood #88902 $ 1,102.00 b. Gawthrop, Greenwood #88903 $ 547.07
- LIAISON REPORTS
- FINANCIAL REPORTS June Report
- OLD BUSINESS
- GOALS 2011 Goals
- NEW BUSINESS
- CAPACITY REQUESTS - None
- SEWER REPORTS Director of Public Works Report – Will be given verbally by Mark Miller; East Goshen Township Flows for June 2011
- ANY OTHER MATTER
F:\Data\Shared Data\Agendas\Municipal Authority\2011\7-11-2011 .doc
- CORRESPONDENCE AND REPORTS OF INTEREST Fax from Gawthrop, Greenwood/ Clinger Matter; Letter from Gawthrop, Greenwood/Clinger Matter
- PUBLIC COMMENT
- ADJOURNMENT
- EXECUTIVE SESSION – LEGAL Letter to Wm. H. Clinger Corp for Warranties and Bonds
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| August 10, 2011 – Jack | October 1, 2011 |
| November 9, 2011- Dana | January 1, 2011 |
F:\Data\Shared Data\Agendas\Municipal Authority\2011\7-11-2011 .doc
Brickhouse Environmental
Consultants and Engineers
East Goshen Municipal Authority1580 Paoli Pike
West Chester, PA 19380
Invoice number: 6004
Date: 7/1/2011
Client ID: 548
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of June 2011.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 48.00 | 5,520.00 |
| Labor Total | 48.00 | 5,520.00 |
| Reimbursable | Amount |
|---|---|
| 0.00 | |
| Expense Total | 0.00 |
| Invoice Total | 5,520.00 |
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin StreetWest Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com
When Creativity & Experience Count
Brickhouse Environmental
PROJECT ACCOMPLISHMENTS
EAST GOSHEN/RIDLEY CREEK SEWAGE TREATMENT PLAN UPGRADE/EXPANSION
BE PROJECT No. 09-2532-0
JUNE 2011 SERVICES
- 6-Jun-11 Telephone call to Jeff Bush regarding RCSTP SBR 2 motive pump impeller and volute wear, Telephone call with Matt McAloon regarding SBR 2 inspection. Work on O&M and Process Control Plan. Draft ready for Evan's comments due Thursday, 6/9 by Noon.
- 7-Jun-11 Voicemail to Mark Lauer of Flyght, re SBR 2 motive pump. Telephone conversation with Mark Miller regarding SBR 2 motive pump and MEI's progress towards cleaning the Aqua Aerobic disc filter cloth. Reviewed the CIM 1000 installation procedure and Dan Barbato's proposed scenarios' towards the formation of the "bubbles" (outgassing) to Rick and the Authority.
- 8-Jun-11 Work on O&M and process control procedures.
- 9-Jun-11 Preparation, internal review and distribution of the Project Manager's report for the month of May 2011 (3hrs) Preparation of the RCSTP wastewater treatment system process control and equipment O&M guide. (4hrs)
- 10-Jun-11 Preparation of the RCSTP wastewater treatment system process control and equipment O&M guide.
- 13-Jun-11 Updated draft process control plan to include internal comments. Provided Rick a copy for review and comments Prepare for and attend Monthly Authority Meeting
- 14-Jun-11 On site at RCSTP to meet with Mark Miller, Rick Smith and Jack Yahraes from EGTMA and Chris Candy from ITT Flyght Corp. The purpose was to meet, discuss and investigate the nature of the excessive wear on SBR 2 jet mixer pump (motive pump). Prepared draft letter to Clinger Corp for project closeout. 2 and letter.
Brickhouse Environmental
PROJECT ACCOMPLISHMENTS
EAST GOSHEN/RIDLEY CREEK SEWAGE TREATMENT PLAN UPGRADE/EXPANSION
BE PROJECT No. 09-2532-0
JUNE 2011 SERVICES
- 15-Jun-11 On site at RCSTP gathering information for the process control sampling and testing plan. Reviewed the status of operations, data and set points with the plant operator. Settleability is poor resulting in solids loss in the effluent, however, the disc filters are preventing solids loss into the final outfall. Microscopic exam suggest that the sludge age should be lengthened which will assist in settleability. The minimum air is set at 160 minutes, whereas, 120 minutes should be adequate. Recommended process control testing to verify ammonia concentrations 30, 60 and 120 minutes during React Phase of support lowering the minimum air time. Lessening the amount of air entrapped within the sludge floc will assist in improving settleability.
- 16-Jun-11 Emails to Jeff Bush to confirm when the SHT #1 telescopic valve, influent flow meter and signal to the composite sampler will be completed. Tentative plans were to complete the work on Friday, June 17th. Email to Jeff Bush re O&M bond information. Distributed the Clinger letter for comments.
- 17-Jun-11 Finalize letter to Clinger regarding 2nd notice for project close out documentation. Site visit to RCSTP. Telephone call to Jeff Bush regarding maintenance bond. Follow up on items from Twp. Code enforcement for occupancy permit for RCSTP
- 20-Jun-11 Finalize Clinger letter, print final copy. Update with Jeff Bush and Dan Barbato regarding the proposed Dutchland repairs. Inquiry as to the status of the SHT #1 telescopic valve and influent flow meter repair.
Brickhouse Environmental
PROJECT ACCOMPLISHMENTS
EAST GOSHEN/RIDLEY CREEK SEWAGE TREATMENT PLAN UPGRADE/EXPANSION
BE PROJECT No. 09-2532-0
JUNE 2011 SERVICES
- 21-Jun-11 Coordination with Jeff Bush from Worth & Company regarding the repairs to SBR #2. Responded to inquiry as to how long SBR 2 will remain out service. Worth & Dutchland were informed that the SBR is anticipated to remain out of service at a minimum until July 8th. Spoke with Mark Miller regarding removing the rainwater from SBR 2. Jeff Bush was informed that Dutchland and the plant operator can remove the remaining rain water from the tank while Dutchland is on site repairing the corbels. No push back from Worth or Dutchland.
- 22-Jun-11 Work on revising process control sample collection and test guidance plan. Distributed Cling Corporation 2nd notice of required close out documents.
- 23-Jun-11 Telephone conversation with Dwayne regarding SHT #1 telescopic valve repair. Potential dates are June 30th or July 1st. The additional SBR 2 motive pump guiderail bracket was installed on June 16th. Email with Jeff Bush confirming Dutchland on site June 27th to begin SBR 2 repairs.
- 27-Jun-11 Site visit to RCSTP from 4:30 PM to 5:30 PM. Follow up on repairs initiated by Dutchland, Inc. review Clinger letter dated June 22, 2011 and followed up on safety labels installed by Clinger Corporation. Confirm the problem reported by the Plant Operator regarding the UV system bank no. 2, model 5 , lamps 5, 6, 7, and 8. Email correspondence and file update.
- 28-Jun-11 Telephone call with Scott Stump, plant operator, regarding several issues with operation of the centrifuge sludge dewatering system. Prepared email to Worth & Company and copies Steve from Alfa Laval and Mark Miller. Reviewed plant influent data from Atlantic Coast Laboratory and developed a spreadsheet using the plant design information for reference. Prepared a bench sheet for the process control manual for microscopic examination documentation, including key points to note during observations.
Brickhouse Environmental
PROJECT ACCOMPLISHMENTS
EAST GOSHEN/RIDLEY CREEK SEWAGE TREATMENT PLAN UPGRADE/EXPANSION
BE PROJECT No. 09-2532-0
JUNE 2011 SERVICES
- 29-Jun-11 Visit to RCSTP to monitor the progress of the repairs to SBR 2 with regards to Dutchland repairing the CIM coating and enlarging the opening between the walkway and walls to prevent shearing of concrete from the "face" of the corbels adjacent to the walkway. Reviewed equipment malfunction items with Scott Stump, plant operator. Emailed repair/warranty list to Jeff bush and copies Mark Miller. Spent a minor amount of time on the process control guidance protocol with respect to microscopic examinations.
- 30-Jun-11 On site at RCSTP from 8:00 to 8:45 AM. Reviewed alarms on centrifuge and UV system. Telephone conversation with Jeff Bush to arrange for centrifuge dewatering system repairs. Telephone conversation with Dwayne confirming Friday's site visit to repair the SHT No.1 telescopic valve and influent flow meter.
- 1-Jul-11 On site at RCSTP working with Dwayne from Worth & Co to correct the problems with SHT No.1 telescopic valve. ACS did not influent flow meter and a separate visit will be scheduled. The flow signal to the influent composite sampler was determined to be in the Siemens SBR MCC cabinet and not terminated. Clinger will be contacted to terminate the wire. The final effluent flow meter signal was terminated in the ACS panel and confirmed to produce a signal to the final effluent composite sampler. The final effluent composite sampler was programmed and placed in flow proportioned sample collect mode to operate in flow proportioned mode. Replaced the ballast for UV bank number 2, module 5, lamps 5, 6, 7, and 8. No comparison data TSS was gathered from the portable TSS meter loaned to assist with plant operations to the traditional method for determining MLSS.
J:\092532.0\Project Management\Bullets\June 2011 Bullets.doc
JULY 5, 2011 PAGE 4
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
Brickhouse's contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours and $175,030.
From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.
The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting which then expended the original 1,522 hours.
The Board subsequently approved Brickhouse Environmental to continue to serve the Authority's needs as requested on a T&M basis.
Monthly Project Management Subtotals Beyond the Original Budget
| Month | Project Subtotals | |||
|---|---|---|---|---|
| Pro. Mgt. Hours | Cumulative Hours | Cumulative | Monthly Fees | |
| October 2010 | 36.25 | 36.25 | $4,168.75 | $4,168.75 |
| November 2010 | 86.50 | 122.75 | $14,116.25 | $9,947.50 |
| December 2010 | 136.00 | 258.75 | $29,756.25 | $15,640.00 |
| January - February 4, 2011 | 97.75 | 356.50 | $40,997.50 | $11,241.25 |
| February - March 4, 2011 | 58.00 | 414.50 | $47,667.50 | $6,670.00 |
| March - April 1, 2011 | 50.00 | 464.50 | $53,417.50 | $5,750.00 |
| April 2 - April 30, 2011 | 40.75 | 505.25 | $58,103.75 | $4,686.25 |
| May - June 3, 2011 | 94.00 | 599.25 | $68,913.75 | $10,810.00 |
| June 6 - July 1, 2011 | 48.00 | 647.25 | $74,433.75 | $5,520.00 |
Project Cumulating Totals
| Project Management Hours | Fee |
|---|---|
| 2,129.25 | $248,763.75 |
\092532.0\Project Management\PM Schedule\Extended Schedule.xls
Page 1 of 1
EGMA 1100
Pennoni
MEMORANDUM
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Daniel Barbato, P.E. Authority Engineer |
| DATE: | June 8, 2011 |
| SUBJECT: | Engineer’s Report |
RCSTP Upgrade and Expansion
- Construction phase services continue with punchlist monitoring, review of operations and maintenance submittals and as-built plans, progress meetings, troubleshooting, and coordination with the Project Manager and the Township.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation continue working on punchlist completion. A punchlist update for both contractors will be completed in the next week. Verification of completed items continues. Clarification was sent to the Project manager to Clinger regarding closeout requirements. Additional paper copies of the design drawings were sent to Clinger at their request for markup.
- Pennoni was asked provide an opinion on the benefit of a whole-plant blowdown to restart the plant. Pennoni’s design engineer was present during the Siemens testing in May and we provided commentary and clarifications to the Project Manager’s report on performance testing. We do not believe that draining the SBRs and reseeding is warranted. We have also been provided additional comments to the Township and PM regarding optimization of the plant operations, which are the result of several discussions with the Plant Operator and the Project Manager.
- Matt McAloon of Pennoni was be present on June 3 to assist with the inspection the interior and coating of SBR#2 after it is drained and cleaned.
I/I Metering Project
- The Township continues to meter flows at selected locations. A new program for monitoring meter data is starting up. Meters are in operation in at locations as recommended and two meters will be moved to new locations. Significant progress is being made to reduce infiltration and inflow.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2011\Memo to EGMA Board 2011-06-08.docx
EGMA 1100
Ridley Creek Consent Order
- The next report is due in September. No comments were received from DEP on the March report.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- Pennoni was asked at the last Authority meeting to clarify the two scope of work items listed as “survey allocations”. Site recon and preliminary survey to compare the plans to existing conditions were completed at the end of May. The plans are relatively close to existing conditions with some variances in horizontal and vertical accuracy. The plans provided were based on aerial survey. Based on the recon and preliminary survey, we do not anticipate that a full boundary, topographic, and property survey will be needed unless specifically required to meet DEP permitting requirements.
- A pre-application/closure requirements meeting was held with DEP on June 3 with Pennoni and the Township. DEP believes that sludge can be left in the ponds if properly handled and deemed non-hazardous. DEP will obtain confirmation from their Waste Management Division to confirm this determination. Pennoni will draft a closure plan for review and comment.
- DEP appears to be satisfied with our response to their comments for the Hersheys Mill/Reserve report. We anticipate approval of the reports in the next month.
Marydell PS Elimination Planning
- The draft report for the Act 537 Plan Revision was submitted to DEP in April. No comments have been received from DEP at the time of this report.
Applebrook Spray Irrigation NPDES Permit Renewal
- We are preparing the NPDES discharge permit and anticipate submittal to DEP in Mid-June.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2011\Memo to EGMA Board 2011-06-08.docx
Miller Environmental Inc.
The Water and Wastewater Authority®
Reading, PA 19602-2209
Telephone: (610) 376-9162
Facsimilie: (610) 376-9164
Email: info@miller-env.com
www.miller-env.com Mr. Rick Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Re: East Goshen Wastewater Treatment Plants- Lochwood & Ridley Creek
July, 2011- Monthly Operation and Maintenance Report
Dear Mr. Smith:
Miller Environmental, Inc. is pleased to report on Operations and Maintenance activities for the month of June, 2011.
Routine Operation and Maintenance Activities
- Daily sampling, testing, and inspections for permit compliance.
- Routine daily testing for process optimization.
- Microscopic exams are good.
- UV Ballast replaced and working.
- G.E. scheduled training July 19.
Non-Routine Operations and Maintenance Activities
- Alarm responses dropping.
- Quarterly well reporting.
- Nitrification reestablished.
- SBR #2 off-line.
- Flow signals being modified for sampling permit compliance.
- Alum feed MP32 being adjusted.
- Centrifuge conveyor motor needs repair.
- Lochwood spray system tripping-out at night.
- Magnesium Hydroxide being evaluated.
Summary of Influent Flow- Ridley Creek
- AVERAGE: 198,000 gallons
- MAXIMUM: 242,000 gallons
Page 1 of 2
Summary of Lochwood Chase Flow
- Average 8,500 gallons per day
Permit Compliance
- Ridley had a value of 15 mg/L for ammonia and the monthly limit is 4. The plant has since reestablished nitrification, as noted in last month’s report.
- Lochwood had a value of 37 mg/L CBOD and the monthly limit is 25. Disinfection has been adjusted.
Thank you,
MILLER ENVIRONMENTAL INC.
William Ronyack
Operations Manager
(SENT VIA EMAIL)
CC: Mark Miller, Director of Public Works
Scott Stump, MEI
Dean Miller, MEI
File
Miller Environmental Inc.
The Water and Wastewater Authority®
Page 2 of 2
WILLIAM H. CLINGER, CORP.
P. O. Box 158
736 Baltimore Pike
Concordville, Pa. 19331
phone (610) 459-1234
fax (610) 459-8823
WORK ORDER # 2770
SHEET _____ OF _____
FOR JOB Waste Water Facility
TO:
East Goshen Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, Pa. 19380-6199
TERMS: Net 30 Days
| Field | Value |
|---|---|
| DATE RECEIVED BY OFFICE | |
| INVOICE # | |
| INVOICE DATE | |
| FOREMAN | |
| CUSTOMER'S ORDER # | |
| T & M | |
| CHANGE ORDER | |
| JOB NAME / NUMBER | CEG800 |
| JOB LOCATION | EGWWTP |
| PERCENT COMPLETE | 100.00% |
| WEEK ENDING * | 04/30/11 |
* Week begins on Monday and ends on Sunday
| QTY. | MATERIAL | PRICE | AMOUNT | DESCRIPTION OF WORK |
|---|---|---|---|---|
| 0.00 | Reprogrammed VFD #3 for correct max. RPM of 1750 from 1352. | |||
| 0.00 | Reprogrammed VFD #4 for correct Deceleration time of 20sec. Not 90sec. | |||
| 0.00 | (This was not a warranty item) |
OTHER CHARGES
| Description | Amount |
|---|---|
| GE Technician | 2,100.00 |
| Markup | 210.00 |
| TOTAL OTHER | 2,310.00 |
LABOR
| LABOR | DATE | ST OT DT | HRS. | RATE | AMOUNT |
|---|---|---|---|---|---|
| Robert Dina | 04/27/11 | ST | 4.00 | 145.00 | 580.00 |
| TOTAL HOURS AND LABOR | 580.00 |
Handwritten note: ok Rick 7/5/11
| Summary | Amount |
|---|---|
| DATE COMPLETED: | |
| TOTAL MATERIALS | 0.00 |
| TOTAL OTHER | 2,310.00 |
| TAX | |
| TOTAL OTHER | 2,890.00 |
Thank You
Work Ordered by: Scott Towler
Signature: _________________________
1 of 2
WILLIAM H. CLINGER, CORP.
P. O. Box 158
736 Baltimore Pike
Concordville, Pa. 19331
phone (610) 459-1234
fax (610) 459-8823
WORK ORDER # 2775 Rev. 1 6/30/11
SHEET _____ OF _____
FOR JOB Waste Water Facility
TO:
East Goshen Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, Pa. 19380-6199
TERMS: Net 30 Days
| Field | Value |
|---|---|
| DATE RECEIVED BY OFFICE | |
| INVOICE # | |
| INVOICE DATE | |
| FOREMAN | Matt Burke |
| CUSTOMER'S ORDER # | |
| T & M | |
| CHANGE ORDER | |
| JOB NAME / NUMBER | CEG800 |
| JOB LOCATION | EGWWTP |
| PERCENT COMPLETE | 100.00% |
| WEEK ENDING * | 05/14/11 |
* Week begins on Monday and ends on Sunday
| QTY. | MATERIAL | PRICE | AMOUNT | DESCRIPTION OF WORK |
|---|---|---|---|---|
| 0.00 | Reinstalled conduit supports that came off as a result of using as a step. | |||
| 0.00 | Supplied a conductor for an Hour Meter that was never on our electrical drawings. | |||
| 0.00 | (Neither of these are warranty items) |
OTHER CHARGES
| Description | Amount |
|---|---|
| TOTAL OTHER | 0.00 |
LABOR
| LABOR | DATE | ST OT DT | HRS. | RATE | AMOUNT |
|---|---|---|---|---|---|
| Matt Burke | 05/10/11 | ST | 3.50 | 97.55 | 341.43 |
| Robert Dina | 05/10/11 | ST | 2.00 | 145.00 | 290.00 |
| TOTAL HOURS AND LABOR | 631.43 |
Handwritten note: ok Rick 7/5/11
| Summary | Amount |
|---|---|
| DATE COMPLETED: | |
| TOTAL MATERIALS | 0.00 |
| TOTAL OTHER | 0.00 |
| TAX | |
| TOTAL OTHER | 631.43 |
Thank You
Work Ordered by: Scott Towler
Signature: _________________________
RYERSON™
Invoice 93064709
Page 1 of 1
Ryerson Wilmington700 Pencader Drive
NEWARK DE 19702
USA
| Invoice Date | 06/23/2011 | Customer PO | VERBAL STEVE, MARK |
|---|---|---|---|
| Payer Number | 10328801 | Reference | |
| Currency | USD | PO Date | 06/15/2011 |
| Delivery Receipt | 83535106 | Shipping Type | Truck |
| Ship Date | 06/23/2011 | Incoterms | PPD PREPAID & DELIVERED |
| Bill of Lading | 9500811799 | ||
| Bill To | Ship To |
|---|---|
|
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 USA |
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 USA |
| Remit To | Federal ID # |
|---|---|
|
J.T.Ryerson & Son,Inc. P. O. Box 29953 New York NY 10087-9953 USA |
361717960 |
| Item | Description | Quantity | Net Weight | Price | Amount |
|---|---|---|---|---|---|
| 000010 |
304 SMLS PIPE 2.5" SCH40 X 21' 10" Customer PO Item Number 10 Sales Order Item 12322622-000010 dated 06/15/2011 |
3 PC | 378.999 LB | 518.58 / PC | 1,555.74 |
| 000020 |
304 SMLS PIPE 1.5" SCHXH X 20' RL Customer PO Item Number 20 Sales Order Item 12322622-000020 dated 06/15/2011 |
1 PC | 128.000 LB | 623.29 / PC | 623.29 |
| 000030 |
304 SMLS PIPE 1.5" SCHXH X 10 '9" Customer PO Item Number 30 Sales Order Item 12322622-000030 dated 06/15/2011 |
1 PC | 69.000 LB | 526.74 / PC | 526.74 |
| 000040 |
304 SMLS PIPE 3" SCH40 X 24" Customer PO Item Number 40 Sales Order Item 12322622-000040 dated 06/15/2011 |
1 PC | 15.000 LB | 133.62 / PC | 133.62 |
| Payment Terms: 1/2% 10, Net 30 | Subtotal | 2,839.39 |
|---|---|---|
| Tax | 0.00 | |
| Total Amount | 2,839.39 | |
| Discount if paid by 07/03/2011 | 14.20- |
APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07424-7440
Remittances are received by a bank acting as a clearing agency without authority to determine whether or not the amount remitted constitutes payment or settlement of item noted thereon. Notwithstanding any notation regarding payment in full or settlement, the bank shall deposit such remittances and such deposit shall not indicate our acceptance of the remittance as payment in full or settlement. Please show Invoice No. and Account No. on remittance or attach copy of invoice. If your remittance differs from this amount less allowable discount, please indicate reason. The articles and/or performance of the services covered by this invoice were produced in compliance with the Federal Fair Labor Standards Act of 1938 as amended. The Ryerson Conditions and Terms of Sale are applicable to all sales by Ryerson Inc.'s subsidiaries.
RYERSON™
Delivery Receipt 83535106
Page 1 / 3
|
Ship To: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 USA |
Shipment date: 06/22/2011 Shipment No.: 9500811799 Account Number: 10328801 Contact Name: Ship to Phone No.: 610-692-7171 Receiving Hours: Thursday 0000 0000 Sales Rep: Mark Varites Sales Rep Phone: 302-366-5627 Sales Office: 4077 |
Load: wc east goshen Trailer: Tractor: Ship Terms: PPD Total Stop Items: 4 Stop Gross Wgt.: 590.999 Stop Net Wgt.: 590.999 Total Packages: 1 |
|---|---|---|
|
Bill To: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 USA |
||
| Del Item | Sales Order / Item No | Customer P.O.# PO Item # | Your Ref | Ordered Qty | ORD UOM | Description | Shpd Qty | Shpd UOM |
|---|---|---|---|---|---|---|---|---|
| 10 | 12322622 10 | VERBAL STEVE, MARK / 000010 | 379.000 | 3 PC LB 10" | 304 SMLS PIPE 2.5" SCH40 X 21' 10" | 3 PC | 378.999 LB | |
|
Production Order # 105608733 Master Bundle HU 1008835528 Handling Unit Qty Pc Weight Heat Slab Batch Number 1008835526 2 PC 252.666 LB 3B492 3B492 0013146277 1008835527 1 PC 126.333 LB YX0812-397 YX0812-397 0013146278 3 PC Total Max Pkg: 1000 Pounds Unload: Standard Loading |
||||||||
| Test Report Not Required | ||||||||
| 20 | 12322622 20 | VERBAL STEVE, MARK / 000020 | 128.000 | 1 PC LB RL | 304 SMLS PIPE 1.5" SCHXH X 20' RL | 1 PC | 128.000 LB | |
|
Production Order # 105608734 |
||||||||
APPROVED BY: [initials]
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 057424-7450 Pump Lifts
| Customer Signature | Date | Delivered By |
|---|
RYERSON™
Delivery Receipt 83535106
Page 2 / 3
Master Bundle HU 1008835528
| Handling Unit | Qty Pc | Weight | Heat | Slab | Batch Number |
|---|---|---|---|---|---|
| 1008828621 | 1 PC | 128.000 LB | V71194 | V71194 | 0013137818 |
| 1 PC Total | |||||
Max Pkg: 1000 Pounds Unload: Standard Loading
Test Report Not Required
| Del Item | Sales Order / Item No | Customer P.O.# PO Item # | Your Ref | Ordered Qty | ORD UOM | Description | Shpd Qty | Shpd UOM |
|---|---|---|---|---|---|---|---|---|
| 30 | 12322622 30 | VERBAL STEVE, MARK / 000030 | 69.000 | 1 PC LB | 304 SMLS PIPE 1.5" SCHXH X 10 '9" | 1 PC | 69.000 LB | |
|
Production Order # 105608735 Master Bundle HU 1008835528 Handling Unit Qty Pc Weight Heat Slab Batch Number 1008828623 1 PC 69.000 LB 771-0360 771-0360 0013137825 1 PC Total Max Pkg: 1000 Pounds Unload: Standard Loading |
||||||||
| Test Report Not Required | ||||||||
| 40 | 12322622 40 | VERBAL STEVE, MARK / 000040 | 15.000 | 1 PC LB | 304 SMLS PIPE 3" SCH40 X 24" | 1 PC | 15.000 LB | |
|
Production Order # 105608736 Master Bundle HU 1008835528 Handling Unit Qty Pc Weight Heat Slab Batch Number 1008828624 1 PC 15.000 LB YX0812-397 YX0812-397 0013137828 1 PC Total Max Pkg: 1000 Pounds Unload: Standard Loading |
||||||||
| Customer Signature | Date | Delivered By |
|---|
RYERSON™
Delivery Receipt
83535106
Page 3 / 3
| Del Item | Sales Order / Item No | Customer P.O.# PO Item # |
Your Ref | Ordered Qty | ORD UOM | Description | Shpd Qty | Shpd UOM |
|---|---|---|---|---|---|---|---|---|
| Test Report Not Required | ||||||||
Customer Signature ____________________ Date __________ Delivered By ____________________
Signature by customer verifies material delivered is correct and in good condition. Claims or shortages must be reported within 30 days of receipt. This material cannot be returned without our permission. Returned material is subject to handling charges. Conditions of sales are set out on quotations, confirmations and invoices we have previously sent you. Your signatures here is evidence that you have read the conditions of sale and agree to them. Conditions and terms of sale are available at www.ryerson.com.
GRAINGER
PAGE 1 OF 1
ORIGINAL INVOICE
580 E LANCASTER AVE
FRAZER, PA 19355-1808
www.grainger.com
GRAINGER ACCOUNT NUMBER: 829095066
INVOICE NUMBER: 9559020087
INVOICE DATE: 06/10/2011
DUE DATE: 07/10/2011
AMOUNT DUE: 1,968.46
SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
PO NUMBER: RIDLEY CREEK
CALLER: MARK MILLER
CUSTOMER PHONE: (610) 692-7171
ORDER/DELIVERY#: 6165902589
INCO TERMS: FOB ORIGIN
BILL TO:
MDG2010 00006240 1 AT 0365
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
THANK YOU!
FEI NUMBER 36-1150280
FOR ANY QUESTIONS ABOUT THIS INVOICE OR ACCOUNT CALL 610-727-5251
| PO LINE # | ITEM # | DESCRIPTION | QUANTITY | BACK ORDERED | UNIT PRICE | TOTAL |
|---|---|---|---|---|---|---|
| 1DLD5 | SS CABLE,1/4 IN,100 FT,1220 LB CAPACITY MANUFACTURER # 1DLD5 |
4 | 200.48 | 801.92 | ||
| 4FRY9 | WIRE ROPE CLIP/THIMBLE KIT,1/4IN,316SS MANUFACTURER # ID003404-06 |
16 | 14.22 | 227.52 | ||
| 2Z602 | WINCH,HAND,1800 LB MANUFACTURER # DL1800A |
7 | 81.32 | 569.24 | ||
| 5RTD8 | SHEAVE,WIRE ROPE,MAX CBL 3/8 IN,471 LB MANUFACTURER # 5RTD8 |
8 | 15.20 | 121.60 | ||
| 1DMV2 | SWAGING TOOL,MULTI SIZE CAPABLE MANUFACTURER # 1DMV2 |
1 | 248.18 | 248.18 |
APPROVED BY: [signature]
DATE PAID: ____________
CHECK #: ____________
CHARGED TO: 07424-7450
NUMBER OF PKGS: 0 WEIGHT: 145.57
DATE SHIPPED: 06/10/2011
INVOICE SUB TOTAL: 1,968.46
These items are sold for domestic consumption in the United States. If exported, purchaser assumes full responsibility for compliance with US export controls.
PAYMENT TERMS NET 30 DAYS. PAY THIS INVOICE NO STATEMENT SENT. PAYABLE IN U.S. DOLLARS.
AMOUNT DUE 1,968.46
PLEASE DETACH THIS PORTION AND RETURN WITH YOUR PAYMENT.
BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
REMIT TO:
GRAINGER
DEPT. 829095066
PALATINE, IL 60038-0001
829095066955902008710001968461000000010000000100000011071030
ACCOUNT NUMBER: 829095066
DATE: 06/10/2011
INVOICE NUMBER: 9559020087
AMOUNT DUE: 1,968.46
FOR COMMENTS OR CHANGE OF ADDRESS, ENTER INFORMATION ON REVERSE SIDE.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
05/31/2011
Client No: 6604-01M
Invoice No. 89644
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date | Description | Hours | Total |
|---|---|---|---|
| 05/09/2011 RFA |
Review packet for 5/9/11 meeting of Municipal Authority; attend regular meeting of Authority. | 3.00 | |
| For Current Services Rendered | 3.00 | 570.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 3.00 | $190.00 | $570.00 |
| Previous Balance | $1,102.00 |
|---|---|
| Total Current Charges | 570.00 |
| 05/13/2011 Fee Payment | -513.00 |
| Balance Due | $1,159.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
05/31/2011
Client No: 6604-08M
Invoice No. 89645
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Ridley Creek Treatment Plant - Arbitrations
Fees
| Date | Description | Hours | Total |
|---|---|---|---|
| 05/31/2011 SRM |
Review correspondence from plaintiff regarding mediation and response. | 0.50 | 87.50 |
| SRM | Telephone conference with plaintiff; research regarding proposed mediators. | 0.70 | 122.50 |
| For Current Services Rendered | 1.20 | 210.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Stephen R. McDonnell | 1.20 | $175.00 | $210.00 |
| Previous Balance | $547.07 |
|---|---|
| Total Current Charges | 210.00 |
| 05/13/2011 Cost Expense Payment | -109.57 |
| 05/13/2011 Fee Payment | -332.50 |
| Total Payments | -442.07 |
| Balance Due | $315.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205
Invoice
Number: 123232
Date: 20-May-2011
Order Num: 171304
Serviced: 05-May-2011
P.O. Number:
Job Description: tank skimmings
BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
JOB SITE
Ridley Creek Treatment Plant
1751 Towne Drive
West Chester, PA 19380
| Quantity | ServiceType | Amount | Tax | Warranty & Expiration | Extension |
|---|---|---|---|---|---|
| 7700 | Disposal Charges 7700 GALLONS @ .0586 5/5/11 |
$0.06 | No | 0 Days | $451.22 |
| 1.5 | Pump Truck 125/HR ON SITE-5/5/11 |
$125.00 | No | 0 Days | $187.50 |
| 1 | Fuel Surcharge | $15.00 | No | 0 Days | $15.00 |
| 7420 | Disposal Charges 7420 GALLONS @ 0586 5/5/11 |
$0.06 | No | 0 Days | $434.81 |
| Taxable Amount: $0.00 | Tax Rate: 0 | Tax: $0.00 | Tax Description: PA Tax Exempt | Subtotal NonTaxed: | $6,169.22 |
|---|---|---|---|---|---|
| Subtotal Taxable: | $0.00 | ||||
| Subtotal Tax: | $0.00 | ||||
| Payment Terms: Net 30 | Payment: $0.00 | Adjustment: $0.00 | Late Charge: $0.00 | Please Pay: | $6,169.22 |
PA State Homeowner Protection Act, Registration #PA022859
A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.
Please detach here and return the bottom portion with your payment.
From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| Order No. | Invoice No. | Date | Amount Due |
|---|---|---|---|
| 171304 | 123232 | 20-May-2011 Serviced 05-May-2011 |
$6,169.22 |
To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
APPROVED BY: [signature]
DATE PAID: ___________
CHECK #: ___________
CHARGED TO: ___________
Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205
Invoice
Number: 123232
Date: 20-May-2011
Order Num: 171304
Serviced: 05-May-2011
P.O. Number:
Job Description: tank skimmings
BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
JOB SITE
Ridley Creek Treatment Plant
1751 Towne Drive
West Chester, PA 19380
| Quantity | ServiceType | Amount | Tax | Warranty & Expiration | Extension |
|---|---|---|---|---|---|
| 7 | FSN- Guzzler 250/HR ON SITE-PUMP FOAM OFF 4 TANKS-5/5/11 |
$250.00 | No | 0 Days | $1,750.00 |
| 1 | Fuel Surcharge | $15.00 | No | 0 Days | $15.00 |
| 2400 | Disposal Charges 2400 GALLON @ .0586 5/5/11 |
$0.06 | No | 0 Days | $140.64 |
| 3.75 | Bulk Liquid Waste Hauling 125/HR ON SITE-5/5/11 |
$125.00 | No | 0 Days | $468.75 |
| 1 | Fuel Surcharge | $20.00 | No | 0 Days | $20.00 |
| Taxable Amount: $0.00 | Tax Rate: 0 | Tax Description: PA Tax Exempt Tax: $0.00 |
Subtotal NonTaxed: | |
|---|---|---|---|---|
| Subtotal Taxable: | ||||
| Subtotal Tax: | ||||
| Payment Terms: Net 30 | Payment: $0.00 | Adjustment: $0.00 Late Charge: $0.00 |
Please Pay: | Continued |
PA State Homeowner Protection Act, Registration #PA022859
A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.
Please detach here and return the bottom portion with your payment.
From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| Order No. | Invoice No. | Date | Amount Due |
|---|---|---|---|
| 171304 | 123232 | 20-May-2011 Serviced 05-May-2011 |
Continued |
To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205
Invoice
Number: 123232
Date: 20-May-2011
Order Num: 171304
Serviced: 05-May-2011
P.O. Number:
Job Description: tank skimmings
BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
JOB SITE
Ridley Creek Treatment Plant
1751 Towne Drive
West Chester, PA 19380
| Quantity | ServiceType | Amount | Tax | Warranty & Expiration | Extension |
|---|---|---|---|---|---|
| 7 | FSN- Guzzler $250 pr hr on site-PUMP FOAM OFF 4 TANKS-5/2/11 |
$250.00 | No | 0 Days | $1,750.00 |
| 1 | Fuel Surcharge | $15.00 | No | 0 Days | $15.00 |
| 3.5 | Pump Truck 125/HOUR-ON-SITE-5/2/11 |
$125.00 | No | 0 Days | $437.50 |
| 1 | Fuel Surcharge | $15.00 | No | 0 Days | $15.00 |
| 8000 | Disposal Charges 8000 GALONS @ .0586 5/2/11 |
$0.06 | No | 0 Days | $468.80 |
| Taxable Amount: $0.00 | Tax Rate: 0 | Tax Description: PA Tax Exempt Tax: $0.00 |
Subtotal NonTaxed: | |
|---|---|---|---|---|
| Subtotal Taxable: | ||||
| Subtotal Tax: | ||||
| Payment Terms: Net 30 | Payment: $0.00 | Adjustment: $0.00 Late Charge: $0.00 |
Please Pay: | Continued |
PA State Homeowner Protection Act, Registration #PA022859
A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.
Please detach here and return the bottom portion with your payment.
From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| Order No. | Invoice No. | Date | Amount Due |
|---|---|---|---|
| 171304 | 123232 | 20-May-2011 Serviced 05-May-2011 |
Continued |
To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
AQUASM
Aqua Wastewater Management, Inc.
60 Schoolhouse Road
Souderton, PA 18964
800.338.9271
T: 215.799.2200
F: 215.799.2205
PA State Homeowner Protection Act Registration # PA022859
CUSTOMER INFORMATION
| Customer Name: EAST GOSHEN TOWNSHIP | Date Contacted: 4/28/11 |
|---|---|
| Street: RIDLEY CREEK WWTP 1580 PAOLI PK. |
Work Order #: 171304 |
| City: WEST CHESTER State: PA Zip: | Technician Name: TRIP B, BRIAN F |
| Telephone: | Date & Time Arrive: 5/2 & 5/5 8:00 AM - 7:20 AM Date & Time Depart: 5/2 & 5/5 3:30 PM - 2:20 PM |
JOB DETAILS
| Contracted Price OR: $ | Time For Each Service Performed: | Total Cost Each Service: |
|---|---|---|
| Guzzler: 14 HRS | Jetting: | $ |
| CSE: | Gallons: 25,100 | $ |
| Pumper Truck: [crossed out] | Laborer (# of techs): 3 | $ |
| Materials: | $ | |
|
Description/ Materials: PUMPED AND PULLED FOAM FROM 4 TANKS. NOT SURE HOW TO CHARGE FOR DUMP TRUCK |
||
RECOMMENDATIONS
WORK COMPLETED & SATISFACTORY
By signing below, customer confirms job satisfaction.
| Customer Signature: | Sub Total (from above): $ |
|---|---|
| Print Name: | Additional Fees (tax, fuel surcharge, etc.): $ |
| Date: | Total Completed Job Price: $ |
PAYMENT TERMS
- [ ] This is an Invoice. Payment required within _____ days of invoice date.
- [ ] Payment required upon job completion. This is your receipt.
- [ ] This is a Quote/ Proposal (valid for _____ days).
PAYMENT DETAILS
| Check # & Amount | Cash | Money Order # & Amount | |
|---|---|---|---|
| Credit Card | MC or Visa | #'s | Expiration Security Code |
DELCORA
Delaware County Regional Water Quality Control Authority
PO Box 999
Chester, Pennsylvania 19016-0999
(610)876-5523
Hauled Waste Manifest
No. 128966
Waste Generator
Generator #1: Ridley Creek [illegible]
Print: ____________________
City, State: ____________________ Zip Code: __________
Generator #2: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Generator #3: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Waste Characterization
| Type | Source | Volume |
|---|---|---|
| 1. Domestic Holding Tank | Residential [ ] Non-Residential [ ] |
_____ gal |
| 2. Domestic Septic Tank/ Cesspool | Residential [ ] Non-Residential [ ] |
_____ gal |
| 3. Package Plant | _____ gal | |
| 4. Domestic Wastewater* Treatment Plant Sludge (Form 43) | 4000 gal | |
| 5. Industrial Treatment* Sludge (Form U) | _____ gal | |
| 6. Commercial/Industrial* Wastewater | _____ gal | |
| 7. Grease (Food /Restaurant) | _____ gal | |
| 8. Miscellaneous* | Portable Toilets [ ] Other [ ] |
_____ gal |
*NOTE: Wastewater treatment sludges, industrial wastewater, grease and other non-residential source wastes require prior approval for disposal. Non-domestic wastes will not be accepted if mixed with domestic wastes in the same load.
Certification (Optional for residential sources only)
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no wastes other than those expressly indicated are included in this waste and that the above waste does not contain any RCRA hazardous wastes as defined in 40 CFR 261. I understand that failure to comply with conditions of any applicable industrial discharge permit or other legal requirements may result in immediate suspension of the permit, and/or penalties as stipulated in the permit and/or allowed by law.
Authorized Agent: ____________________ Date: __________
Transporter
Transporter Name: ____________________ Print
Truck/Hauler #: ____________________
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no other wastes not expressly indicated on this manifest were included or mixed with this load, including any RCRA hazardous wastes as defined in 40 CFR 261. I am aware of the conditions and requirements of the waste hauler permit, and understand that failure to comply with the permit may result in immediate suspension of the permit and/or possible penalties as stipulated in the permit an/or allowed by law. I certify that the vehicle transporting aforementioned waste is in compliance with Pennsylvania's Department of Environmental Protection's Act 90 Rules and Regulations.
Driver Name: [signature] Signature: [signature] Date: __________
DELCORA
Date: 5/2/11 Time: 1210 Truck Capacity: _____ gal
Volume Received: 4000 gal
Sample ID #: AQPP050711 Radiation: Pass / Fail
pH: 6.34
TS %: _____
VS%: _____
Color: _____
Odor: _____
Form U:
Volatility: Pass / Fail
Sulfide: Pass / Fail
Cyanide: Pass / Fail
DELCORA Central Laboratory
Other Characteristics:
COD: _____ mg/L
TSS: _____ mg/L
OUR: + / -
Metals:
Special: _____
Name: [signature] Print
Signature: [signature]
DELCORA TRANSPORTER
Delaware County Regional Water Quality Control Authority
DELCORA
PO Box 999
Chester, Pennsylvania 19016-0999
(610)876-5523
Hauled Waste Manifest
No. 128967
Waste Generator
Generator #1: Ridley Creek Treatment Plant (Print)
City, State: West Chester, PA Zip Code: 19380
Generator #2: (Print)
City, State: Zip Code:
Generator #3: (Print)
City, State: Zip Code:
Waste Characterization
| Type | Source | Volume |
|---|---|---|
| 1. Domestic Holding Tank | Residential [ ] Non-Residential [ ] |
_____ gal _____ gal |
| 2. Domestic Septic Tank/Cesspool | Residential [ ] Non-Residential [ ] |
_____ gal _____ gal |
| 3. Package Plant | 4000 gal | |
| 4. Domestic Wastewater* Treatment Plant Sludge (Form 43) | _____ gal | |
| 5. Industrial Treatment* Sludge (Form U) | _____ gal | |
| 6. Commercial/Industrial* Wastewater | _____ gal | |
| 7. Grease (Food /Restaurant) | _____ gal | |
| 8. Miscellaneous* | Portable Toilets [ ] Other [ ] |
_____ gal |
*NOTE: Wastewater treatment sludges, industrial wastewater, grease and other non-residential source wastes require prior approval for disposal. Non-domestic wastes will not be accepted if mixed with domestic wastes in the same load.
Certification (Optional for residential sources only)
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no wastes other than those expressly indicated are included in this waste and that the above waste does not contain any RCRA hazardous wastes as defined in 40 CFR 261. I understand that failure to comply with conditions of any applicable industrial discharge permit or other legal requirements may result in immediate suspension of the permit, and/or penalties as stipulated in the permit and/or allowed by law.
Authorized Agent: _________________________ Date: _________________________
Transporter
Transporter Name: Aqua (Print) Truck/Hauler #: 667
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no other wastes not expressly indicated on this manifest were included or mixed with this load, including any RCRA hazardous wastes as defined in 40 CFR 261. I am aware of the conditions and requirements of the waste hauler permit, and understand that failure to comply with the permit may result in immediate suspension of the permit and/or possible penalties as stipulated in the permit an/or allowed by law. I certify that the vehicle transporting aforementioned waste is in compliance with Pennsylvania's Department of Environmental Protection's Act 90 Rules and Regulations.
Driver Name: Brian M Signature: Brian M Date: 5/2/11
DELCORA
Date: _________________________ Time: _________________________
Sample ID #: _________________________
Truck Capacity: _____ gal
Volume Received: _____ gal
Radiation: Pass / Fail
| Measurement | Form U | DELCORA Central Laboratory |
|---|---|---|
| pH: | Other Characteristics: | |
| TS %: | Volatility: Pass / Fail | COD: _____ mg/L |
| VS%: | Sulfide: Pass / Fail | TSS: _____ mg/L |
| Color: | Cyanide: Pass / Fail | OUR: + / - |
| Odor: | Metals: Special: |
Name: (Print)
Signature:
DELCORA GENERATOR
VALLEY FORGE SEWER AUTHORITY
NON-HAZARDOUS TRUCKED WASTE MANIFEST
307944
TRANSPORTER DATA
COMPANY: Aqua
DRIVER: Phil Heisley
TRUCK NUMBER: 110/328
TANK CAPACITY: 6700 GALLONS LOAD pH: _____
CERTIFICATION: I, [signature] certify this information on this manifest to be true and correct to the best of my knowledge.
LOAD DISCHARGED AT (CIRCLE LOCATION): [ ] 1 [ ] 2 [ ] 3
VFSA USE ONLY
CUST: ____________________
GEN: ____________________
PRICE: ____________________
TRANS: ____________________
INDUSTRIAL GENERATOR DATA ONLY - MUST BE PREAPPROVED BY AUTHORITY
| Customer Name | Customer Address - Street, Town, Zip | Date/Time Of Pickup | Signature of Company Representative |
|---|---|---|---|
TYPE OF WASTE: (CHECK ONE) [ ] TREATMENT PLANT SLUDGE [ ] PROCESS WASTE [ ] LEACHATE [ ] OTHER
GREASE GENERATOR DATA ONLY - MUST BE PREAPPROVED BY AUTHORITY
| Customer Name | Customer Address - Street, Town, Zip | Date/Time Of Pickup |
|---|---|---|
HOLDING TANK DATA ONLY - MUST BE PREAPPROVED BY AUTHORITY
| Customer Name | Customer Address - Street, Town, Zip | Date/Time Of Pickup |
|---|---|---|
| East Goshen Twp | Ridley Creek WWTP / 1000 gal | 5/5/11 |
| Episcopal Academy | Newtown Sq / 5700 gal | 2:10 PM 5/5/11 |
SEPTAGE WASTE DATA ONLY
| Customer Name | Customer Address - Street, Town, Zip | Septic Tank | Portable Toilets | Date/Time Of Pickup |
|---|---|---|---|---|
WHITE: VFSA COPY | YELLOW: TRANSPORTER COPY | PINK: GENERATOR COPY
DELCORA
Delaware County Regional Water Quality Control Authority
PO Box 999
Chester, Pennsylvania 19016-0999
(610)876-5523
Hauled Waste Manifest
No. 125390
Waste Generator
Generator #1: East Goshen Ridley Creek WWTP
Print: ____________________
City, State: West Chester, PA Zip Code: __________
Generator #2: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Generator #3: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Waste Characterization
| Type | Source | Volume |
|---|---|---|
| 1. Domestic Holding Tank | Residential [ ] Non-Residential [X] |
6700 gal |
| 2. Domestic Septic Tank/ Cesspool | Residential [ ] Non-Residential [ ] |
_____ gal |
| 3. Package Plant | _____ gal | |
| 4. Domestic Wastewater* Treatment Plant Sludge (Form 43) | _____ gal | |
| 5. Industrial Treatment* Sludge (Form U) | _____ gal | |
| 6. Commercial/Industrial* Wastewater | _____ gal | |
| 7. Grease (Food /Restaurant) | _____ gal | |
| 8. Miscellaneous* | Portable Toilets [ ] Other [ ] |
_____ gal |
*NOTE: Wastewater treatment sludges, industrial wastewater, grease and other non-residential source wastes require prior approval for disposal. Non-domestic wastes will not be accepted if mixed with domestic wastes in the same load.
Certification (Optional for residential sources only)
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no wastes other than those expressly indicated are included in this waste and that the above waste does not contain any RCRA hazardous wastes as defined in 40 CFR 261. I understand that failure to comply with conditions of any applicable industrial discharge permit or other legal requirements may result in immediate suspension of the permit, and/or penalties as stipulated in the permit and/or allowed by law.
Authorized Agent: ____________________ Date: 5/5/11
Transporter
Transporter Name: AQUA Print
Truck/Hauler #: 040505 / TR 110/328
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no other wastes not expressly indicated on this manifest were included or mixed with this load, including any RCRA hazardous wastes as defined in 40 CFR 261. I am aware of the conditions and requirements of the waste hauler permit, and understand that failure to comply with the permit may result in immediate suspension of the permit and/or possible penalties as stipulated in the permit an/or allowed by law. I certify that the vehicle transporting aforementioned waste is in compliance with Pennsylvania's Department of Environmental Protection's Act 90 Rules and Regulations.
Driver Name: Phil Heisley Signature: [signature] Date: 5/5/11
DELCORA
Date: 5/5/11 Time: 100 Truck Capacity: 6700 gal
Volume Received: 6700 gal
Sample ID #: AQHT050711 Radiation: Pass / Fail
pH: 6.8
TS %: _____
VS%: _____
Color: _____
Odor: _____
Form U:
Volatility: Pass / Fail
Sulfide: Pass / Fail
Cyanide: Pass / Fail
DELCORA Central Laboratory
Other Characteristics:
COD: _____ mg/L
TSS: _____ mg/L
OUR: + / -
Metals: _____
Special: _____
Name: [signature] Print
Signature: [signature]
DELCORA TRANSPORTER
DELCORA
Delaware County Regional Water Quality Control Authority
PO Box 999
Chester, Pennsylvania 19016-0999
(610)876-5523
Hauled Waste Manifest
No. 129385
Waste Generator
Generator #1: East Goshen - Ridley Creek W.W.T.P. EQ TANK
Print: ____________________
City, State: West Chester, PA. Zip Code: __________
Generator #2: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Generator #3: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Waste Characterization
| Type | Source | Volume |
|---|---|---|
| 1. Domestic Holding Tank | Residential [ ] Non-Residential [X] |
4000 gal |
| 2. Domestic Septic Tank/ Cesspool | Residential [ ] Non-Residential [ ] |
_____ gal |
| 3. Package Plant | _____ gal | |
| 4. Domestic Wastewater* Treatment Plant Sludge (Form 43) | _____ gal | |
| 5. Industrial Treatment* Sludge (Form U) | _____ gal | |
| 6. Commercial/Industrial* Wastewater | _____ gal | |
| 7. Grease (Food /Restaurant) | _____ gal | |
| 8. Miscellaneous* | Portable Toilets [ ] Other [ ] |
_____ gal |
*NOTE: Wastewater treatment sludges, industrial wastewater, grease and other non-residential source wastes require prior approval for disposal. Non-domestic wastes will not be accepted if mixed with domestic wastes in the same load.
Certification (Optional for residential sources only)
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no wastes other than those expressly indicated are included in this waste and that the above waste does not contain any RCRA hazardous wastes as defined in 40 CFR 261. I understand that failure to comply with conditions of any applicable industrial discharge permit or other legal requirements may result in immediate suspension of the permit, and/or penalties as stipulated in the permit and/or allowed by law.
Authorized Agent: ____________________ Date: 5-5-11
Transporter
Transporter Name: Aqua Print
Truck/Hauler #: 139
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no other wastes not expressly indicated on this manifest were included or mixed with this load, including any RCRA hazardous wastes as defined in 40 CFR 261. I am aware of the conditions and requirements of the waste hauler permit, and understand that failure to comply with the permit may result in immediate suspension of the permit and/or possible penalties as stipulated in the permit an/or allowed by law. I certify that the vehicle transporting aforementioned waste is in compliance with Pennsylvania's Department of Environmental Protection's Act 90 Rules and Regulations.
Driver Name: Bill Evans Signature: [signature] Date: 5-5-11
DELCORA
Date: 5-5-11 Time: 1335 Truck Capacity: 4000 gal
Volume Received: 4000 gal
Sample ID #: AQHT050711 Radiation: Pass / Fail
pH: 6.39
TS %: _____
VS%: _____
Color: _____
Odor: _____
Form U:
Volatility: Pass / Fail
Sulfide: Pass / Fail
Cyanide: Pass / Fail
DELCORA Central Laboratory
Other Characteristics:
COD: _____ mg/L
TSS: _____ mg/L
OUR: + / -
Metals: _____
Special: _____
Name: [signature] Print
Signature: [signature]
DELCORA TRANSPORTER
DELCORA
Delaware County Regional Water Quality Control Authority
PO Box 999
Chester, Pennsylvania 19016-0999
(610)876-5523
Hauled Waste Manifest
No. 129383
Waste Generator
Generator #1: East Goshen - Ridley Creek Treatment Plant EQ Tank (3420)
Print: ____________________
City, State: West Chester PA Zip Code: __________
Generator #2: West Whiteland Twp - Clover Mill Pump Station (580)
Print: ____________________
City, State: Exton PA Zip Code: __________
Generator #3: ____________________
Print: ____________________
City, State: ____________________ Zip Code: __________
Waste Characterization
| Type | Source | Volume |
|---|---|---|
| 1. Domestic Holding Tank | Residential [ ] Non-Residential [X] |
4000 gal |
| 2. Domestic Septic Tank/ Cesspool | Residential [ ] Non-Residential [ ] |
_____ gal |
| 3. Package Plant | _____ gal | |
| 4. Domestic Wastewater* Treatment Plant Sludge (Form 43) | _____ gal | |
| 5. Industrial Treatment* Sludge (Form U) | _____ gal | |
| 6. Commercial/Industrial* Wastewater | _____ gal | |
| 7. Grease (Food /Restaurant) | _____ gal | |
| 8. Miscellaneous* | Portable Toilets [ ] Other [ ] |
_____ gal |
*NOTE: Wastewater treatment sludges, industrial wastewater, grease and other non-residential source wastes require prior approval for disposal. Non-domestic wastes will not be accepted if mixed with domestic wastes in the same load.
Certification (Optional for residential sources only)
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no wastes other than those expressly indicated are included in this waste and that the above waste does not contain any RCRA hazardous wastes as defined in 40 CFR 261. I understand that failure to comply with conditions of any applicable industrial discharge permit or other legal requirements may result in immediate suspension of the permit, and/or penalties as stipulated in the permit and/or allowed by law.
Authorized Agent: ____________________ Date: 5-5-11
Transporter
Transporter Name: Aqua Print
Truck/Hauler #: 139
I hereby certify that the foregoing information is true and complete to the best of my knowledge and that no other wastes not expressly indicated on this manifest were included or mixed with this load, including any RCRA hazardous wastes as defined in 40 CFR 261. I am aware of the conditions and requirements of the waste hauler permit, and understand that failure to comply with the permit may result in immediate suspension of the permit and/or possible penalties as stipulated in the permit an/or allowed by law. I certify that the vehicle transporting aforementioned waste is in compliance with Pennsylvania's Department of Environmental Protection's Act 90 Rules and Regulations.
Driver Name: Bill Evans Signature: [signature] Date: 5-5-11
DELCORA
Date: 5-5-11 Time: 1020 Truck Capacity: 4000 gal
Volume Received: 4000 gal
Sample ID #: AQHT050711 Radiation: Pass / Fail
pH: 6.67
TS %: _____
VS%: _____
Color: _____
Odor: _____
Form U:
Volatility: Pass / Fail
Sulfide: Pass / Fail
Cyanide: Pass / Fail
DELCORA Central Laboratory
Other Characteristics:
COD: _____ mg/L
TSS: _____ mg/L
OUR: + / -
Metals: _____
Special: _____
Name: [signature] Print
Signature: [signature]
DELCORA TRANSPORTER
009037
NEW CASTLE COUNTY DEPARTMENT OF SPECIAL SERVICES
87 READS WAY, NEW CASTLE, DELAWARE 19720
AQUA WASTWATER MANAGEMENT, INC.
HAULED WASTEWATER MAINFEST
(COMPLETE THIS FORM FOR LOADS DISCHARGED TO THE AIRPORT ROAD PUMP STATION)
1. Generator of Waste
Driver Name: Tripp Baird
Truck #: 100
Customer: East Goshen
Pick Up Date: 5/5/11
Address: E Goshen Twp Pa
Customer Signature: ____________________
Print Customer Name: ____________________
2. Type of Waste
| Source | ✓ | Volume |
|---|---|---|
| Residential- septic or holding tank | ✓ | 2400 |
| Commerical- septic or holding tank | ||
| Grease Trap | ||
| Pump Station | ||
| Industrial | ||
| OTHER (specify) |
3. Disposer of Waste (to be filled out at dump site.)
The above described wastewater was picked up and hauled by the above named company to the Airport Road Pump Station and was discharged on the date shown below. I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware of that there are significant penalties for submitting false information, including the possibility of fines and prosecution for knowing violations.
Driver Signature: [signature]
Truck #: 100
Print Driver Name: Tripp Baird
NCC Permit #:
Date Discharged: 5/5/11
Time Discharged:
RUMSEY
www.rumsey.com
Phone: 610-832-9097
Fax: 610-941-8183
QUALITY & SERVICE - SINCE 1895
** INVOICE **
| INVOICE DATE | INVOICE NUMBER |
|---|---|
| 05/26/11 | S3727010.001 |
REMIT TO:
RUMSEY ELECTRIC CO.
PO BOX 824429
PHILADELPHIA, PA 19182-4429
PAGE NO. 1 of 1
BILL TO:
WILLIAM H. CLINGER CORPORATION
736 BALTIMORE PIKE
P.O. BOX 158
CONCORDVILLE, PA 19331-0158
SHIP TO:
WILLIAM H CLINGER CORP
c/o RIDLEY CREEK WWTP
1751 TOWNE DRIVE
WEST CHESTER, PA 19380-6483
| CUSTOMER NUMBER | CUSTOMER ORDER NUMBER | RELEASE NUMBER | SALESPERSON |
|---|---|---|---|
| 9246 | RIDLEY CREEK | MARK HAGGERTY |
| WRITER | SHIP VIA | TERMS | SHIP DATE | ORDER DATE |
|---|---|---|---|---|
| CHIP VANDEVE | BW - BEST WAY | 2% 10th Prox Net EOM | 05/26/11 | 04/26/11 |
| LN | DESCRIPTION | ORDER QTY | SHIP QTY | NET UNIT PRICE | NET AMOUNT |
|---|---|---|---|---|---|
| 1 | GE ENERGY LOT CONSISTING OF: 1 DAY OF SERVICE TO DIAGNOSE DRIVE AT THE RIDLEY CREEK WASTE WATER JOB | 1 | 1 | 2100.00ea | 2100.00 |
*PLEASE NOTE* OUR NEW REMITTANCE ADDRESS: RUMSEY ELECTRIC CO. PO BOX 824429 PHILADELPHIA, PA 19182-4429
If paid by 06/10/11 you may deduct $42.00
Payment is due by 06/30/11 net of any cash discount
Refer to www.Rumsey.com/contactus/creditapp for Terms and Conditions
Past due accounts are subject to a 1.5% per month service charge.
| Subtotal | 2100.00 |
|---|---|
| S&H CHGS | 0.00 |
| Sales Tax | 0.00 |
| Amount Due | 2100.00 S3727010.001 |
2 of 2
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 13, 2011
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday June 13, 2011 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Chairman Joseph McCawley, Jack Yahraes, Fran Beck, and Dana Pizarro. Also in attendance were: Rick Smith, Township Manager; Mark Miller, Director of Public Works; Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; Scott Towler from Brickhouse Environmental; William Ronyack (Miller Environmental); Carmen Battavio, Township Supervisor; Walter Wujcik (Conservancy Board) and Dan Daley (Planning Commission).
COMMON ACRONYMS:
| MA– Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lockwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Joe McCawley called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. Joe asked if anyone would be taping the meeting. There was no response.
2. RIDLEY CREEK REPORTS
A. Brickhouse Report
Efforts during the month of May were largely focused on resolving warranty related issues identified through operation of the facility, on –site technical training and troubleshooting by Siemens Personnel and working with both contractors to provide the necessary documentation required for project close out.
A meeting was held on May 4th to review the documentation required for project closeout. In attendance were representatives from the Municipal Authority, Pennoni Associates Inc, Brickhouse Environmental Inc, Worth & Company, and Clinger Corporation. Letters summarizing the requirements as specified in the contract documents were provided to both contractors.
During the week of May 9th through May 12th , Paul Christiansen from Siemens Jet Tech SBR was on site to provide the third week of technical training and assistance as specified within the contract documents. Process control data was compiled and provided to Mr. Chirstiansen in advance of his visit so he could familiarize himself with operation of the treatment system. The training was attended by staff from Miller Environmental, Municipal Authority, Pennoni Associates Inc and Brickhouse Environmental Inc. A summary report was prepared.
Representatives from Clinger Corporation and Worth & Company were on site to address outstanding punch list and warranty items. Clinger provided Staff, during the week of May
MA Minutes 06/13/2011 1
9th in order to resolve punch list items. Recent additions to the Worth & Company warranty repair list included a reversing contactor for the incline conveyor for the centrifuge dewatering system. The item was replaced through Worth & Company and the system returned to service.
The wastewater treatment operation and maintenance service provider discontinued the addition of sodium hypochlorite to the SBRs. The treatment system experienced a loss of nitrification resulting in elevated ammonia as nitrogen concentrations in the final effluent. Measures to restore nitrification were implemented and nitrification was restored during the week of May 31st. Measures to improve the settle ability of the SBR activated sludge have been implemented to reduce solids loss through the effluent.
SBR #2 was removed from service, drained and cleaned. The Municipal Authority has contracted with a sludge hauling company to remove and dispose of the sludge and debris that accumulated within the basin. An inspection was performed on June 2, 2011 revealing several “bubbles” beneath the CIM liner. The bubbles were observed to be dry when opened, suggesting the presence of “outgassing” resultant from inadequate initial surface preparation and/or application condition from the CIM material. A copy of the CIM coating procedure was made available.
The PA DEP Water Quality Specialist/Inspector continues to routinely visit the facility and maintain communication with wastewater treatment operation and maintenance service provider. It is anticipated implementation of the new wastewater treatment permit discharge limitations will be delayed until August 2011, provided the facility has demonstrated consistent compliance with the new discharge permit limits.
The project remains substantially complete with final closeout pending.
Scott passed around an impeller which, after only 1 year; is in bad shape. Flite never did start all 4 pumps. They will be out tomorrow. The flushout valve on this pump is not as steady as the other 3 pumps. Mark said they found no grit in #2. Scott expects Flite will bring a technician to check all pumps. Scott explained the problem with the bubbles under the CIM liner. They want to get the plant back to 6 hour recycling. Scott will get them on a more regular testing schedule.
B. Pennoni – Dan Barbato, reported the following:
RCSTP Upgrade and Expansion
- Construction phase services continue with punch list monitoring, review of operations and maintenance submittals and as-built plans, progress meetings, troubleshooting, and coordination with the Project Manager and the Township.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation continue working on punch list completion. A punch list update for both contractors will be completed in the next week. Verification of completed items continues. Clarification was sent to the Project Manager to Clinger regarding closeout requirements. Additional paper copies of the design drawings were sent to Clinger at their request for markup.
MA Minutes 06/13/2011 2
- Pennoni was asked to provide an opinion on the benefit of a whole-plant blow down to restart the plant. Pennoni’s design engineer was present during the Siemens testing in May and we provided commentary and clarifications to the Project Manager’s report on performance testing. We do not believe that draining the SBRs and reseeding is warranted. We have also provided additional comments to the Township and PM regarding optimization of the plant operations, which are the result of several discussions with the Plant Operator and the Project Manager.
- Matt McAloon, of Pennoni, was present on June 3 to assist with the inspection of the interior and coating of SBR #2 after it was drained and cleaned.
I / I Metering Project
- The Township continues to meter flows at selected locations. A new program for monitoring meter data is staring up. Meters are in operation in locations as recommended and two meters will be moved to new locations. Significant progress is being made to reduce infiltration and inflow..
Ridley Creek Consent Order
- The next report is due in September. No comments were received from DEP on the March report.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- Pennoni was asked at the last Authority meeting to clarify the two scope of work items listed as “survey allocations”. Site recon and preliminary survey to compare the plans to existing conditions were completed at the end of May. The plans are relatively close to existing conditions with some variances in horizontal and vertical accuracy. The plans provided were based on aerial survey. Based on the recon and preliminary survey, we do not anticipate that a full boundary, topographic, and property survey will be needed unless specifically required to meet DEP permitting requirements.
- A pre-application/closure requirement meeting was held with DEP on June 3with Pennoni and the Township. DEP believes that sludge can be left in the ponds if properly handled and deemed non-hazardous. DEP will obtain confirmation from their Waste Management Division to confirm this determination. Pennoni will draft a closure plan for review and comment.
- DEP appears to be satisfied with our response to their comments for the Hershey’s Mill/Reserve report. We anticipate approval of the reports in the next month.
Marydell PS Elimination Planning
- The draft report for the Act 537 Plan Revision was submitted to the DEP in April. No comments have been received from DEP at the time of this report.
Applebrook Spray Irrigation NPDES Permit Renewal
- We are preparing the NPDES discharge permit and anticipate submittal to DEP in Mid-June.
MA Minutes 06/13/2011 3
C. Miller Environmental Report
Bill Ronyack reported the following:
- Aqua continues to work on Norcardia removal
- MEI & Pennoni are scheduled to meet and recommend a plan for dealing with old sludge.
- Scott Towler is working on filter feed #2 alarm
- 2 UV Low/Low alarms on 5/5; SBR #4 turbs.
- Plant is recovering from early April solids loss. Exact cause is undetermined.
- Owners/Operators/Engineers/Contractors met to discuss ongoing issues.
- No new issues at Lockwood.
Bill mentioned that Jesse is doing additional screening. Jack asked about the containers of Chlorine. Bill said they were 5 gallon containers for Lockwood.
Bill pointed out that on the DMR, in the column for number of exceptions, 0 is good. If a higher number is put in, the program will automatically request a sub-report explaining any issues.
They are still getting a lot of nuisance alarms.
Jack mentioned odors at Lockwood. Bill explained that the permit is very specific about amounts to be sprayed. They are making efforts to get close to the allowable limit.
Cost Summary Report
None
D. Change Orders
None
3. RCSTP INVOICES
A. Brickhouse Environmental, #5983, $10,810.00. Jack moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
B. Worth & Co. #25, $125,323.79. Rick and Mark Miller recommended paying $100,000. Joe agreed since there is a pump issue to resolve. Jack moved to approve payment in the amount of $100,000. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
C. Aqua Wastewater Management #123232, $6,169.22. Jack moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
D. Clinger #M11050 (due to PECO problem) $16,059.00. Dana moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
E. Gawthrop Greenwood, PC #88903, $105.00. Fran moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
F. Glasgow, Inc. #249252, $3,628.97. Jack moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
G. Hammond & McCloskey #5031, $3,450.59. Dana moved to approve payment. Jack seconded the motion. There was no further discussion. The motion passed unanimously.
H. Hammond & McCloskey #5077, $1,004.67. Fran moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
I. Pennoni, #473337, $1,177.50. Dana moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
MA Minutes 06/13/2011 4
4. CHAIRMAN'S REPORT
A. Fran attended the West Goshen meeting. They are still working on an analysis of Goose Creek.
5. APPROVAL OF MINUTES
A. Jack moved to approve the minutes of the May 9, 2011 meeting as corrected. Dana seconded the motion. The motion passed unanimously.
6. APPROVAL OF INVOICES
A. Pennoni, #473327, $1,867.50. Dana moved to approve payment. Jack seconded the motion. There was no further discussion. The motion passed unanimously.
B. Pennoni, #473328, $502.50. Dana moved to approve payment. Jack seconded the motion. There was no further discussion. The motion passed unanimously.
C. Pennoni, #473329, $750.00. Fran moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
D. Pennoni, #473330, $1,494.00. Jack moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
E. Pennoni, #473331, $295.00. Jack moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
F. Pennoni, #473332, $1,747.50. Rick pointed out that this invoice is for Ridley Creek meeting. Dana moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
G. Gawthrop Greenwood, #88902, $589.00. Dana moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
H. Maillie, Falconiero & Co., #1000005019, $7,500.00. Jack moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
7. LIAISON REPORTS
A. Conservancy Board – Walter reported that they are continuing to work on a plan for handling invasives in Applebrook Park. They need to have a report to the Board of Supervisors by September 2011. Weeds, Inc. is continuing to spray invasives at the Blacksmith Shop and Reservoir Road locations. 100 understory shrubs were planted in May at the new woodland area at Line Rd and Paoli Pk. This area is fenced in for now to keep the deer out.
B. Historical Commission – Jack read a report from Ellen which said that 450 people attended their 12th Annual June Living History Day. They changed to the Civil War era so the Plank House became a tavern serving ginger beer. The re-enactors had a cannon, a covered wagon and horses. It was a very successful day.
C. Board of Supervisors – Carmen reported that the Community Day on June 25, 2011 is now completely funded by sponsors. There will be no need to use tax money. He thanked all of the sponsors.
Regarding the Community Day, Rick announced that there will be a township tent and they are asking all of the ABCs to tend a table, providing a handout about their ABC, from 6 to 8 pm. Jack suggested using the comments piece that Sue Smith made up. It could be enlarged and put on an easel. Dan Barbato, Pennoni, offered to make posters, etc., at no cost.
D. Planning Commission – Dan reported that they reviewed a U&O for TRU-Team at 1422 Paoli Pike and are reviewing the township sign ordinance for modification.
MA Minutes 06/13/2011 5
8. FINANCIAL REPORTS
Financial reports were reviewed.
9. OLD BUSINESS
None
10. GOALS
None
11. NEW BUSINESS
A. The Sewer Connection Agreement for 1404 Pine Rock Road was reviewed. The Municipal Authority is giving the current owner 20 years to pay for the sewer connection. If there is any kind of title transfer, it must be paid in full. Jack moved to authorize the Chairman, Joe McCawley, to execute the agreement. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
12. CAPACITY REQUESTS
None
13. SEWER REPORTS
A. Mark Miller reported the following:
Meters: The Chester Creek meters were read on a daily basis. The temporary meters that they have been reading as part of the consent order, were pulled and placed in new locations.
C.C. Collection: The Public Works Department made several lateral repairs this month repairing an estimated 50,000 to 75,000 gallons of infiltration. Pipe Data View made five point repairs on the Chester Creek Collection System. These repairs were done in high traffic areas. They found 1500 feet of sewer line that will need to be lined in Mary Dell Farm.
They found a manhole on Clover Lane that was lined seven years ago starting to come apart. Mark contacted Terre Hill Concrete, who came out and replaced the liner at no cost to the Authority. Mark will be replacing manhole covers this year on the streets that will be repaved. Also, they will be raising the manhole castings with brick and mortar rather than metal paving risers as done in the past, because they found that those risers don't hold up.
Lockwood Plant: The fence around the ponds required some repairs. They also had to replace the gate. The floating aerators were pulled and routine maintenance was done in-house.
Ridley Creek: After the meeting with the contractors, as well as the operators, they seem to be getting the plant back to where it should be. Due to high ammonia levels, the plant operators stopped treating the nacardia. Once the levels drop, they will begin adding chlorine once again. Number 2 SBR was drained, cleaned and inspected by all involved. Mark will have a verbal report on the findings.
The Siemens Engineer was out in May to go over the SBR operations. Scott Towler will report on the engineer's findings. They had some problems with the centerfuge. Worth was notified and came out to make the repairs.
The Public Works Department restored the Turner property last week. They also did some cleanup of basin number 2 and installed jute matting.
Alarms: They responded to 20 alarms during the month of May.
MA Minutes 06/13/2011 6
PA One Calls: The Public Works Department responded to 65 PA One Calls.
14. ANY OTHER MATTER
None
15. CORRESPONDENCE
None
16. PUBLIC COMMENT
None
17. ADJOURNMENT
At 8:15 pm, the Authority went into Executive Session. At 8:30 pm they adjourned from Executive Session and Jack moved to adjourn the regular meeting. Dana seconded the motion. The meeting was adjourned at 8:30 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2011\MA 06-13-11 draft1.doc
MA Minutes 06/13/2011 7
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/30/2011
Client No: 6604-01M
Invoice No. 88902
General Authority Services
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 04/11/2011 | RFA | Review packet for 4/11 meeting of Authority; attend regular meeting of Municipal Authority. | 2.50 | |
| 04/25/2011 | RFA | Review material regarding Goose Creek TMDLS. | 0.60 | |
| For Current Services Rendered | 3.10 | 589.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 3.10 | $190.00 | $589.00 |
| Summary | Amount |
|---|---|
| Previous Balance | $513.00 |
| Total Current Charges | 589.00 |
| Balance Due | $1,102.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/30/2011
Client No: 6604-08M
Invoice No. 88903
Ridley Creek Treatment Plant - Arbitrations
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 04/11/2011 | SRM | Review correspondence from client regarding status; correspondence to client. | 0.20 | 35.00 |
| 04/12/2011 | SRM | Telephone conference with J McCurty. | 0.20 | 35.00 |
| 04/29/2011 | SRM | Voice mail to counsel for Clinger. | 0.20 | 35.00 |
| For Current Services Rendered | 0.60 | 105.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Stephen R. McDonnell | 0.60 | $175.00 | $105.00 |
| Summary | Amount |
|---|---|
| Previous Balance | $442.07 |
| Total Current Charges | 105.00 |
| Balance Due | $547.07 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
2011
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
JULY REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/9/11 - Joe - Completed; Need by 5/4/11 - Fran - Completed; Need by 8/3/11 - Jack; Need by 11/2/11 -Dana; February 2012 - Kevin
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Jack; 2 nd Quarter (June) Fran; 3 rd Quarter (September) Dana; 4 th Quarter (December) Joe
- Respond to capacity requests in 45 days or less.
- Implement I & I Plan
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction.
- Invite Board of Supervisors and all other ABC members to tour the plant.
- Open House at the RCSTP
- Have Siemens conduct a training session for Miller and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens' facility in the mid-west.) Done
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. Completed 3/29/11
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. Completed 6/11
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project. Notice in Daily Local News for public comment 6/11.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2011\071211.doc
2011 FLOWMETERS
2011 JUNE 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY 1000 GPD | ELLIS LANE READING | ELLIS LANE 10 GPD | PAOLI PIKE READING | PAOLI PIKE 10 GPD | WILSON DRIVE READING | WILSON DRIVE 10 GPD | SUMMIT GPD | NET FLOWS | DATE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 06/01/11 | 20,400 | 0 | 06/01/11 | ||||||||
| 0.00 | 06/02/11 | 20,400 | 0 | 06/02/11 | ||||||||
| 0.00 | 06/03/11 | 2,117,497 | 1,235,000 | 19,091,995 | 134,500 | 10,053,348 | 70,510 | 11,636,175 | 62,330 | 20,400 | 967,660 | 06/03/11 |
| 0.00 | 06/04/11 | 20,400 | 0 | 06/04/11 | ||||||||
| 0.00 | 06/05/11 | 20,400 | 0 | 06/05/11 | ||||||||
| 0.00 | 06/06/11 | 2,120,966 | 1,156,333 | 19,131,597 | 132,007 | 10,073,484 | 67,120 | 11,646,920 | 35,817 | 20,400 | 921,390 | 06/06/11 |
| 0.00 | 06/07/11 | 2,122,164 | 1,198,000 | 19,144,847 | 132,500 | 10,080,356 | 68,720 | 11,653,490 | 65,700 | 20,400 | 931,080 | 06/07/11 |
| 0.00 | 06/08/11 | 2,123,300 | 1,136,000 | 19,157,306 | 124,590 | 10,086,741 | 63,850 | 11,660,066 | 65,760 | 20,400 | 881,800 | 06/08/11 |
| 0.05 | 06/09/11 | 2,124,510 | 1,210,000 | 19,170,206 | 129,000 | 10,093,619 | 68,780 | 11,668,985 | 89,190 | 20,400 | 923,030 | 06/09/11 |
| 0.00 | 06/10/11 | 2,125,691 | 1,181,000 | 19,182,780 | 125,740 | 10,100,433 | 68,140 | 11,677,281 | 82,960 | 20,400 | 904,160 | 06/10/11 |
| 0.00 | 06/11/11 | 20,400 | 0 | 06/11/11 | ||||||||
| 0.80 | 06/12/11 | 20,400 | 0 | 06/12/11 | ||||||||
| 0.00 | 06/13/11 | 2,129,238 | 1,182,333 | 19,223,988 | 137,360 | 10,121,370 | 69,790 | 11,696,744 | 64,877 | 20,400 | 910,307 | 06/13/11 |
| 0.10 | 06/14/11 | 2,130,280 | 1,042,000 | 19,235,346 | 113,580 | 10,127,360 | 59,900 | 11,703,891 | 71,470 | 20,400 | 797,050 | 06/14/11 |
| 0.00 | 06/15/11 | 2,131,459 | 1,179,000 | 19,249,267 | 139,210 | 10,134,368 | 70,080 | 11,711,689 | 77,980 | 20,400 | 891,730 | 06/15/11 |
| 0.56 | 06/16/11 | 2,132,609 | 1,150,000 | 19,262,257 | 129,900 | 10,140,624 | 62,560 | 11,719,903 | 82,140 | 20,400 | 875,400 | 06/16/11 |
| 0.00 | 06/17/11 | 2,133,773 | 1,164,000 | 19,276,911 | 146,540 | 10,147,347 | 67,230 | 11,727,925 | 80,220 | 20,400 | 870,010 | 06/17/11 |
| 0.00 | 06/18/11 | 20,400 | 0 | 06/18/11 | ||||||||
| 0.00 | 06/19/11 | 20,400 | 0 | 06/19/11 | ||||||||
| 0.00 | 06/20/11 | 2,137,018 | 1,081,667 | 19,315,342 | 128,103 | 10,166,478 | 63,770 | 11,746,809 | 62,947 | 20,400 | 826,847 | 06/20/11 |
| 0.12 | 06/21/11 | 2,138,127 | 1,109,000 | 19,328,006 | 126,640 | 10,172,571 | 60,930 | 11,755,910 | 91,010 | 20,400 | 830,420 | 06/21/11 |
| 0.00 | 06/22/11 | 2,139,228 | 1,101,000 | 19,340,404 | 123,980 | 10,178,799 | 62,280 | 11,764,678 | 87,680 | 20,400 | 827,060 | 06/22/11 |
| 0.03 | 06/23/11 | 2,140,351 | 1,123,000 | 19,352,393 | 119,890 | 10,185,291 | 64,920 | 11,774,652 | 99,740 | 20,400 | 838,450 | 06/23/11 |
| 0.00 | 06/24/11 | 20,400 | 0 | 06/24/11 | ||||||||
| 0.00 | 06/25/11 | 20,400 | 0 | 06/25/11 | ||||||||
| 0.00 | 06/26/11 | 20,400 | 0 | 06/26/11 | ||||||||
| 0.00 | 06/27/11 | 20,400 | 0 | 06/27/11 | ||||||||
| 0.00 | 06/28/11 | 20,400 | 0 | 06/28/11 | ||||||||
| 0.00 | 06/29/11 | 20,400 | 0 | 06/29/11 | ||||||||
| 0.00 | 06/30/11 | 20,400 | 0 | 06/30/11 | ||||||||
| 2.11 | 1,149,889 | 129,569 | 65,905 | 74,655 | 20,400 | 879,760 |
| Metric | DAILY LOC | INQUIRER | EG TWP |
|---|---|---|---|
| MONTH TO DATE | 2.11 | ||
| NORMAL MONTH TO DATE | |||
| YEAR TO DATE | 24 | ||
| NORMAL YEAR TO DATE |
f:/data/users/joanna/ 2003 flowmeters 7/5/2011 9:33 AM
2011 FLOWMETERS
2011 JUNE 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| HERSHEY'S MILL 10 |
ASHBRIDGE 100 |
HICKS METER 10 |
RESERVOIR 10 |
SHERMAN 10 |
BARKWAY 10 |
||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 21,220,274 | 63,487 | 1,137,143 | 77,633 | 2,324,589 | 331,200 | 125,448,990 | 844,583 | 577,664 | 6,457 | 1,977,292 | 11,457 |
| 21,238,834 | 61,867 | 1,139,564 | 80,700 | 2,402,745 | 260,520 | 125,677,218 | 760,760 | 579,614 | 6,500 | 1,980,545 | 10,843 |
| 21,245,105 | 62,710 | 1,140,309 | 74,500 | 2,435,198 | 324,530 | 125,758,989 | 817,710 | 580,302 | 6,880 | 1,981,564 | 10,190 |
| 21,250,879 | 57,740 | 1,140,976 | 66,700 | 2,466,423 | 312,250 | 125,836,969 | 779,800 | 580,882 | 5,800 | 1,982,598 | 10,340 |
| 21,257,062 | 61,830 | 1,141,697 | 72,100 | 2,501,390 | 349,670 | 125,920,299 | 833,300 | 581,583 | 7,010 | 1,983,743 | 11,450 |
| 21,263,190 | 61,280 | 1,142,386 | 68,900 | 2,535,519 | 341,290 | 126,001,930 | 816,310 | 582,230 | 6,470 | 1,984,784 | 10,410 |
| 21,282,178 | 63,293 | 1,144,658 | 75,733 | 2,623,768 | 294,163 | 126,235,985 | 780,183 | 584,254 | 6,747 | 1,988,076 | 10,973 |
| 21,287,967 | 57,890 | 1,145,325 | 66,700 | 2,654,622 | 308,540 | 126,307,987 | 720,020 | 584,872 | 6,180 | 1,989,097 | 10,210 |
| 21,294,046 | 60,790 | 1,146,033 | 70,800 | 2,688,983 | 343,610 | 126,390,818 | 828,310 | 585,523 | 6,510 | 1,990,136 | 10,390 |
| 21,299,889 | 58,430 | 2,721,388 | 324,050 | 126,468,038 | 772,200 | 586,182 | 6,590 | 1,991,207 | 10,710 | ||
| 21,305,795 | 59,060 | 2,754,264 | 328,760 | 126,548,000 | 799,620 | ||||||
| 21,323,718 | 59,743 | 2,834,201 | 266,457 | 126,762,118 | 713,727 | ||||||
| 21,329,914 | 61,960 | 1,150,179 | 69,100 | 2,868,243 | 340,420 | 126,839,567 | 774,490 | 589,290 | 6,216 | 1,996,351 | 10,288 |
| 21,336,214 | 63,000 | 2,901,268 | 330,250 | 126,915,195 | 756,280 | ||||||
| 21,342,112 | 58,980 | 1,151,501 | 66,100 | 2,936,724 | 354,560 | 126,993,865 | 786,700 | 590,492 | 6,010 | 1,998,358 | 10,035 |
| 21,369,769 | 55,314 | 1,154,723 | 64,440 | 593,425 | 5,866 | 2,003,797 | 10,878 | ||||
| 60,461 | 53,338 | 320,685 | 785,600 | 5,202 | 8,636 | ||||||
f/data/users/joanna/2003 flowmeters
7/5/2011 9:33 AM
Flowmeters June 2011
Legend: June
Y-Axis (Flow's): 1200000, 1000000, 800000, 600000, 400000, 200000, 0
X-Axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
Monthly Totals 2010 Jan-Dec
Y-Axis (Flowmeters): 2500000, 2000000, 1500000, 1000000, 500000, 0
X-Axis (Month): January, February, March, April, May, June, July, August, September, October, November, December
Monthly Totals 2011 (Jan - Dec)
Legend: June
Y-Axis (Precip.): 2.5, 2, 1.5, 1, 0.5, 0
X-Axis (Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
Monthly Totals 2011 (Jan-Dec)
Legend: Monthly Totals
Y-Axis (Precip.): 6, 5, 4, 3, 2, 1, 0
X-Axis (Month): 1, 2, 3, 4
[Stamp: RECEIVED BY...]
East Goshen Township Flows
May 2011
| Date | West Goshen Plant Flow mgd |
West. Way Pump Station mgd |
Ellis Lane Meter Pit mgd |
Paoli Pike Meter Pit mgd |
Wilson Drive Meter Pit mgd |
West. Way Meter Pit mgd |
Total East Goshen Flow mgd |
|---|---|---|---|---|---|---|---|
| 1 | 6.059 | 1.845 | 0.146 | 0.075 | 0.046 | 1.293 | 1.026 |
| 2 | 5.573 | 1.729 | 0.149 | 0.074 | 0.068 | 1.320 | 1.029 |
| 3 | 5.824 | 1.785 | 0.152 | 0.079 | 0.074 | 1.353 | 1.048 |
| 4 | 5.811 | 1.876 | 0.167 | 0.079 | 0.075 | 1.392 | 1.071 |
| 5 | 5.905 | 1.797 | 0.150 | 0.073 | 0.065 | 1.303 | 1.015 |
| 6 | 5.669 | 1.671 | 0.145 | 0.073 | 0.040 | 1.262 | 1.004 |
| 7 | 5.808 | 1.648 | 0.145 | 0.074 | 0.040 | 1.262 | 1.003 |
| 8 | 5.232 | 1.772 | 0.146 | 0.073 | 0.040 | 1.262 | 1.003 |
| 9 | 5.576 | 1.739 | 0.142 | 0.075 | 0.065 | 1.342 | 1.060 |
| 10 | 5.573 | 1.719 | 0.138 | 0.072 | 0.061 | 1.261 | 0.990 |
| 11 | 5.372 | 1.700 | 0.137 | 0.070 | 0.062 | 1.252 | 0.983 |
| 12 | 5.372 | 1.700 | 0.137 | 0.072 | 0.061 | 1.258 | 0.988 |
| 13 | 5.144 | 1.663 | 0.154 | 0.075 | 0.045 | 1.295 | 1.021 |
| 14 | 5.084 | 1.656 | 0.155 | 0.074 | 0.045 | 1.296 | 1.022 |
| 15 | 6.586 | 2.032 | 0.154 | 0.075 | 0.045 | 1.295 | 1.021 |
| 16 | 5.796 | 1.817 | 0.156 | 0.072 | 0.076 | 1.376 | 1.072 |
| 17 | 6.834 | 2.072 | 0.187 | 0.080 | 0.078 | 1.537 | 1.192 |
| 18 | 6.132 | 1.928 | 0.165 | 0.079 | 0.075 | 1.394 | 1.075 |
| 19 | 5.267 | 1.979 | 0.175 | 0.077 | 0.068 | 1.451 | 1.131 |
| 20 | 6.533 | 2.022 | 0.173 | 0.080 | 0.045 | 1.388 | 1.090 |
| 21 | 5.598 | 1.923 | 0.174 | 0.080 | 0.046 | 1.389 | 1.089 |
| 22 | 7.633 | 2.335 | 0.174 | 0.080 | 0.045 | 1.388 | 1.089 |
| 23 | 5.466 | 1.420 | 0.147 | 0.073 | 0.070 | 1.314 | 1.024 |
| 24 | 5.337 | 1.823 | 0.151 | 0.074 | 0.073 | 1.340 | 1.042 |
| 25 | 5.492 | 1.813 | 0.150 | 0.074 | 0.065 | 1.291 | 1.002 |
| 26 | 5.481 | 1.806 | 0.163 | 0.075 | 0.057 | 1.290 | 0.995 |
| 27 | 5.440 | 1.729 | 0.139 | 0.071 | 0.036 | 1.188 | 0.942 |
| 28 | 5.047 | 1.645 | 0.140 | 0.072 | 0.037 | 1.188 | 0.939 |
| 29 | 4.883 | 1.642 | 0.139 | 0.071 | 0.036 | 1.188 | 0.942 |
| 30 | 4.996 | 1.687 | 0.139 | 0.072 | 0.037 | 1.188 | 0.940 |
| 31 | 4.617 | 1.710 | 0.138 | 0.073 | 0.065 | 1.270 | 0.994 |
| 1 | |||||||
| Total | 175.14 | 55.68 | 4.73 | 2.32 | 1.74 | 40.63 | 31.84 |
| Avg. | 5.650 | 1.796 | 0.152 | 0.075 | 0.056 | 1.311 | 1.027 |
NOTES:
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100, P.O. Box 562 p. 610.696.8225
West Chester, PA 19381-0562 www.gawthrop.com
Stephen R. McDonnell
610.696.8225 x163
610.696.7111 Fax
smcdonnell@gawthrop.com
June 29, 2011
Via Facsimile (215-564-3066)
Roy S. Cohen, Esquire
Cohen Seglias, Pallas, Greenhall & Furman, P.C.
United Plaza, 19th Floor
30 S. 17th Street
Philadelphia, PA 19103
[Stamp: RECEIVED BY: JUN 3 0 2011]
Re: East Goshen Municipal Authority/Clinger Matter
Dear Mr. Cohen:
Please be advised my client has authorized me to accept Judge Gaffney as the mediator in relation to the above matter. At this point during the week of August 8 I have available the 8th, 9th, 10th, and 11th, August 23rd and 24th. In September I have the 14th and 15th currently open. If any of these dates work, we will attempt to coordinate with Judge Gaffney with ADR Options.
Very truly yours,
Stephen R. McDonnell
cc: Louis Smith
Robert F. Adams, Esquire
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100, P.O. Box 562 p. 610.696.8225
West Chester, PA 19381-0562 www.gawthrop.com
[Stamp: RECEIVED JUN 2 4 2011]
Stephen R. McDonnell
610.696.8225 x163
610.696.7111 Fax
smcdonnell@gawthrop.com
June 23, 2011
Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
Re: East Goshen Township Municipal Authority
Dear Rick:
I finally had the opportunity to speak with Roy Cohen, Esquire, counsel for Clinger. Unfortunately he was not in a position to discuss resolution of the matter outside of mediation.
We did discuss potential mediators and mutually agreed to recommend retired Judge Gaffney of the Philadelphia Court of Common Pleas. Judge Gaffney has been mediating cases for ADR Options for as long as I can remember and is fairly effective in evaluating and resolving matters.
Please confirm I have authority to retain Judge Gaffney.
Very truly yours,
Stephen R. McDonnell
cc: Robert F. Adams, Esquire
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
FYI
June 30, 2011
Dear Property Owner:
The purpose of this letter is to inform you that the property at 922 N. Chester Rd. West Chester, PA 19380, (formerly McGinty's Nursery) has undergone site remediation for arsenic found in the soil as a result of environmental sampling done on the property. The PA Department of Environmental Protection (DEP) regulates these activities (Land Recycling Program).
Pursuant to Township Policy we are notifying all property owners within 1000 feet of the subject property which has undergone this remediation activity.
A report will be filed shortly with DEP and will outline the findings from the post remediation testing. The information on the "Intent to Remediate" for the property is available for review by the public at the Township Building. If you need more specific information about this remediation project contact the PA DEP at 484-250-5900.
Please give me a call at or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\1000 foot letter re. remediation 06302011.doc
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
[Stamp: RECEIVED AFTER AGENDA WAS PRINTED]
July 7, 2011
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Proposal for Professional Services
Hershey Mill and Reserve Pump Station Diversions Design & Permitting
Dear Mr. Smith:
Pennoni Associates Inc. is pleased to submit the following proposal for the design, permitting, easements, and bid assistance services associated with the diversion of the Hershey Mill Pump Station (HMPS) force main and the closure and diversion of the Reserve Pump Station (RPS).
BACKGROUND
These diversion projects were initiated as a result of the Township Wastewater Needs Evaluation, dated April 16, 2007, which projected future flows through the Chester Creek Collection System (CCCS), a.k.a. West Goshen Service Area, will exceed the capacity limitation in the intermunicipal agreement between East Goshen and West Goshen. The intermunicipal agreement limits East Goshen's wastewater flow through the CCCS to a capacity of 1,000,000 gallons per day (gpd). The Township Wastewater Needs Evaluation determined that under potential future development, the flow through the CCCS may approach 1,300,000 gpd, which will exceed the current intermunicipal agreement and the available treatment capacity of the West Goshen Sewage Treatment Plant. By diverting the HMPS and RPS from the CCCS to the Ridley Creek Collection System (RCCS) and the recently expanded Ridley Creek Sewage Treatment Plant (RCSTP), approximately 64,275 gpd of capacity can be made available under the intermunicipal agreement. Additionally, the developments serviced by both of these pump stations were proposed to have wastewater treated at the RCSTP in the Township's 1999 Act 537 Plan Update.
Following the Township Wastewater Needs Evaluation, Pennoni prepared the Hershey Mill and Reserve Pump Station Special Study, dated February 15, 2008. The study recommended diversion of both pump stations into the RCCS. Pennoni prepared the Act 537 Plan Update Revision for the Hershey Mill and Reserve Pump Station Diversion, last revised June 2010 with a partial supplemental submission to the PADEP on February 17, 2011, which was ultimately approved by the PADEP on June 6, 2011.
The proposed diversion of the HMPS consists of approximately 990 feet of 6-inch force main through the property of 972 Cornwallis Drive and along the Cornwallis Drive right-of-way to a manhole in front of 968 Cornwallis Drive. The proposed diversion of the RPS consists of closure of the existing pump station and approximately 720 feet of gravity sewer extension, partially through the property of 929 Forest Lane, to an existing gravity sewer on the north side of Forest Lane. Each diversion requires one creek crossing.
Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
Rick Smith
July 7, 2011
Page 2
HMPS & RPS Diversions Design & Permitting
SCOPE OF WORK
The scope of work has been divided into eight phases based upon our expectations for the level of work necessary to obtain permits, prepare easements, and develop bidding documents: Design; Survey; Boundary Survey Allocation; E&SPC Permitting; Water Quality Management (WQM) Part 2 Permitting; PADEP General Permits; Bid Assistance; and Additional Meetings. The scope does not include NPDES permitting, stormwater design, or any other County, State, or local permitting associated with sewer construction in the proximity of a pond, wetlands, or floodplain since such permitting is not anticipated to be required. Additionally, the scope does not include topographic or existing conditions surveying, wetlands delineations, bog turtle habitat screening, or historical resources assessments since the work performed on those items during preparation of the Planning Module is expected to be adequate for design and permitting.
Phase 1 – Design
During this phase, Pennoni will prepare the engineering plans and specifications necessary for the diversion of the HMPS force main and the diversion and closure of the RPS. Both diversion projects will be incorporated into one engineering plan set and one set of specifications and bidding documents to result in one construction contract.
The routing and connections of the diversions will be as described above in the "Background" section. The plans and specifications will include existing conditions plans; plans and details of abandonment of the force mains and RPS; plans and profiles of the proposed force main and gravity sewer; details of the connections to existing sewers, road and lawn restoration, sewer appurtenances; and erosion and sediment pollution control plans and details.
Preliminary plans and specifications will be prepared for review by the Township. Following Township approval, the plans and specifications will be used for the permit application submissions to the PADEP (WQM Part 2 Permit and General Permits for Stream Crossings) and Chester County Conservation District (E&SPC Approval).
During the review of the permit applications by the PADEP and County, final plans and specifications will be prepared for bidding and construction.
Phase 2 – Sewer Stakeout and Easements
Pennoni will perform a field survey to stakeout the proposed HMPS force main routing and RPS gravity sewer routing in locations as described above in the "Background" section. The stakeout will be performed to field verify the constructability of the proposed sewers (e.g. evaluate conflicts with existing trees, landscaping, hardscaping, utilities, etc.) and to show property owners the impact of required easements. Pennoni will also prepare legal descriptions and exhibits for permanent easements through a total of six properties (three easements for the proposed HMPS force main and three easements for the proposed RPS gravity sewer).
Rick Smith
July 7, 2011
Page 3
HMPS & RPS Diversions Design & Permitting
Pennoni has previously performed topographic and existing conditions field surveying along the routes of the proposed sewers so no further topographic or existing conditions surveying is included in this scope of work.
Phase 3 – Property Boundary Survey Allocation
Pennoni will verify property boundary and parcel information necessary for the preparation of easements for both diversions. The easements will be prepared as part of Phase 2; however, parcel information needs to be verified since the previous survey was performed nearly two years ago. We will determine if the owners and deeds included on the Planning Module plot plans are current, and we will update the information as necessary if ownership or deed information has changed since the previous survey. If we find that all property information on the plans is accurate and current, the amount of time used from this phase budget will be reduced.
Phase 4 – E&SPC Permitting
During this phase, Pennoni will prepare the application and supporting documents for an Erosion & Sediment Pollution Control (E&SPC) Approval from the Chester County Conservation District (CCCD). Pennoni will attend a pre-application meeting with the CCCD. We will prepare the application forms and E&SPC Narrative(s). The E&SPC design plans developed in Phase 1 will be submitted with the E&SPC application package(s).
Since there will be less than 1 acre of construction disturbance on each diversion, NPDES permitting is not anticipated to be necessary and is not included in this scope of work.
Phase 5 – Water Quality Management Part 2 Permitting
During this phase, Pennoni will prepare the application and supporting documents for a Water Quality Management (WQM) Part 2 Permit from the PADEP for the HMPS Diversion only. Since the HMPS Diversion services over 250 EDU's and involves continued use of a pump station, PADEP's regulations require a WQM Part 2 Permit. The RPS Diversion, on the other hand, services less than 250 EDU's and does not involve continued use of a pump station so it is anticipated that PADEP will not require a WQM Part 2 Permit for that diversion.
Pennoni will attend a pre-application meeting with the PADEP to determine the specific permitting requirements. Based upon PADEP's standard permitting procedures, this phase will consist of preparation of a General WQM Part 2 Permit application including the General Information Form, Design Engineer's Report, Act 14 Notifications, and Sewer Extensions Module 2 or 17. The design plans and specifications developed in Phase 1 will be submitted with the application package. After a WQM Part 2 Permit is obtained, we will prepare a letter to PADEP requesting termination of the existing RPS Permit. The scope does not include preparation of Module 13 for Stream Crossings since the stream crossings are anticipated to be addressed via the PADEP General Permits in Phase 5.
Rick Smith
July 7, 2011
Page 4
HMPS & RPS Diversions Design & Permitting
Phase 6 – PADEP General Permits
Pennoni will prepare two General Permit GP-5 Utility Line Stream Crossings applications and two General Permit GP-8 Temporary Road Crossings applications (one stream crossing for each diversion) and submit to PADEP. The design plans developed in Phase 1 will be submitted with the application package(s) to fulfill the requirement for "sketch plans". Cross-sections will be developed. We will also perform new PNDI searches. The scope does not include addressing any comments that may result from the PNDI search, since such work was already performed as part of the Planning Module. Additionally, the scope does not include any investigations for impacted drinking water intakes or reservoirs or preparation of a pollution control plan since such work is not anticipated to be necessary.
Phase 7 – Bid Assistance
During this phase, Pennoni will provide assistance to the Township during the construction solicitation period at the hourly rates approved for Pennoni in 2011. The anticipated scope includes: attendance at a pre-bid meeting, preparation of additional bid packages as needed, responding to RFI's, review and tabulation of bids, reference checks, and recommendation of award. This phase is included as an approximated budget.
Phase 8 – Additional Meetings
During this phase, Pennoni will attend meetings as requested by the Township at the hourly rates approved for Pennoni in 2011. Additional meetings may include: public meetings; meetings with property owners about easements; and progress review meetings with the Township, PADEP, CCCD, or other regulatory agencies. The E&SPC pre-application meeting with the CCCD and the WQM Part 2 Permit pre-application meeting with the PADEP are not included in this phase, but any follow-up meetings with the agencies will be considered part of this phase. This phase is included as an approximated budget.
Rick Smith
July 7, 2011
Page 5
HMPS & RPS Diversions Design & Permitting
SCHEDULE
We have prepared the Proposed Project Schedule below. The Proposed Project Schedule includes task durations based on our experience and anticipated review times published by PADEP and CCCD. The actual schedule may vary depending on PADEP and CCCD input, scheduling of agency meetings, review comments, etc.
| Task | Contract Day |
|---|---|
| Notice to Proceed | 1 |
| Preliminary Plans and Specifications | 60 |
| Sewer Stake-out | 60 |
| Easements | 75 |
| Submit E&SPC Application | 75 |
| Submit WQM Part 2 Permit Application | 75 |
| Submit GP-5 & GP-8 Applications | 75 |
| E&SPC Approval (60 days) | 135 |
| GP-5 & GP-8 Approval (120 days) | 195 |
| WQM Part 2 Permit Issuance (120 days) | 195 |
| Finalize Plans and Specifications | 195 |
| Advertise Solicitation | 210 |
| Bid Opening | 240 |
FEE
Our estimated fee, to be billed on a time and material basis, is $60,200.00 broken down by Phase as follows:
| Phase | Fee |
|---|---|
| Phase 1 – Design | $23,200.00 |
| Phase 2 – Sewer Stakeout and Easements | $11,000.00 |
| Phase 3 – Property Boundary Survey Allocation | $5,000.00 |
| Phase 4 – E&SPC Permitting | $3,600.00 |
| Phase 5 – Water Quality Management Part 2 Permitting | $6,000.00 |
| Phase 6 – PADEP General Permits | $3,800.00 |
| Phase 7 – Bid Assistance | $6,000.00 |
| Phase 8 – Additional Meetings | $1,600.00 |
| TOTAL | $60,200.00 |
Work shall be done on an hourly basis, billed at the Authority’s approved rates for Pennoni for 2011.
Extraordinary expenses, authorized in advance and identifiable to the specific project will be billed in addition to the above stated fees. These expenses include, but are not limited to: permit application fees, Federal Express and delivery charges, and the reproduction of plans and specifications by outside services. We do not bill for such items as relatively small amounts of in-house printing, mailing expenses, reasonable telephone calls, and travel expenses.
Rick Smith
July 7, 2011
Page 6
HMPS & RPS Diversions Design & Permitting
BILLING AND PAYMENT
Fees will be billed monthly based on actual services completed. Payment is due upon receipt of invoice. Billing and Payment shall be in accordance with Item three (3) of the attached General Terms and Conditions.
The client acknowledges that the method of Billing and Payment has been discussed in detail; that the terms agreed upon can only be changed by a written addendum agreed to by both parties; and work may be stopped until payment is made in accordance with the agreement.
TERMS AND CONDITIONS
General
Pennoni Associates Inc. General Terms and Conditions (Form No. LE01, Rev. 09/2002) are attached hereto and are considered as part of this proposal.
Special
- We will perform our work in accordance with accepted engineering standards. However, we cannot guarantee approvals by permitting agencies as these approvals are subject to circumstances beyond our control.
- Revisions to the plans as may be required by personal preferences of reviewers, reviewing agencies, agency consultants, and the client will be performed as additional work on an hourly basis.
- The proposed projects are understood to be clear of rare, threatened, and endangered species as identified by the Pennsylvania Department of Natural Resource Conservation (DCNR) and archeological and historic resources as identified by the Pennsylvania Historic and Museum Commission (PHMC).
- This proposal is limited strictly to those items quoted above. Application fees and other costs payable to regulatory agencies will be the responsibility of the Client.
We appreciate this opportunity to submit our proposal to the Township. Should you have any questions or need additional information, please do not hesitate to call. Please sign and return one (1) copy of this proposal as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
Daniel P. Barbato, P.E.
Authority Engineer
Rick Smith
July 7, 2011
Page 7
HMPS & RPS Diversions Design & Permitting
Enclosures: As Stated
ACCEPTED BY: _____________________________________
_____________________________________
(Print Name and Title)
DATE: _____________________________________
P:\Projects\EGMA\EGMA0704 PS Special Study\Proposal\Design & Permitting\HMPS & RPS Diversion Design & Permitting PROPOSAL.doc
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
RECEIVED AFTER AGENDA WAS PRINTED
July 7, 2011
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Proposal for Professional Services
Hershey Mill and Reserve Pump Station Diversions Design & Permitting
Dear Mr. Smith:
Pennoni Associates Inc. is pleased to submit the following proposal for the design, permitting, easements, and bid assistance services associated with the diversion of the Hershey Mill Pump Station (HMPS) force main and the closure and diversion of the Reserve Pump Station (RPS).
BACKGROUND
These diversion projects were initiated as a result of the Township Wastewater Needs Evaluation, dated April 16, 2007, which projected future flows through the Chester Creek Collection System (CCCS), a.k.a. West Goshen Service Area, will exceed the capacity limitation in the intermunicipal agreement between East Goshen and West Goshen. The intermunicipal agreement limits East Goshen’s wastewater flow through the CCCS to a capacity of 1,000,000 gallons per day (gpd). The Township Wastewater Needs Evaluation determined that under potential future development, the flow through the CCCS may approach 1,300,000 gpd, which will exceed the current intermunicipal agreement and the available treatment capacity of the West Goshen Sewage Treatment Plant. By diverting the HMPS and RPS from the CCCS to the Ridley Creek Collection System (RCCS) and the recently expanded Ridley Creek Sewage Treatment Plant (RCSTP), approximately 64,275 gpd of capacity can be made available under the intermunicipal agreement. Additionally, the developments serviced by both of these pump stations were proposed to have wastewater treated at the RCSTP in the Township’s 1999 Act 537 Plan Update.
Following the Township Wastewater Needs Evaluation, Pennoni prepared the Hershey Mill and Reserve Pump Station Special Study, dated February 15, 2008. The study recommended diversion of both pump stations into the RCCS. Pennoni prepared the Act 537 Plan Update Revision for the Hershey Mill and Reserve Pump Station Diversion, last revised June 2010 with a partial supplemental submission to the PADEP on February 17, 2011, which was ultimately approved by the PADEP on June 6, 2011.
The proposed diversion of the HMPS consists of approximately 990 feet of 6-inch force main through the property of 972 Cornwallis Drive and along the Cornwallis Drive right-of-way to a manhole in front of 968 Cornwallis Drive. The proposed diversion of the RPS consists of closure of the existing pump station and approximately 720 feet of gravity sewer extension, partially through the property of 929 Forest Lane, to an existing gravity sewer on the north side of Forest Lane. Each diversion requires one creek crossing.
Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
Rick Smith
July 7, 2011
Page 2
HMPS & RPS Diversions Design & Permitting
SCOPE OF WORK
The scope of work has been divided into eight phases based upon our expectations for the level of work necessary to obtain permits, prepare easements, and develop bidding documents: Design; Survey; Boundary Survey Allocation; E&SPC Permitting; Water Quality Management (WQM) Part 2 Permitting; PADEP General Permits; Bid Assistance; and Additional Meetings. The scope does not include NPDES permitting, stormwater design, or any other County, State, or local permitting associated with sewer construction in the proximity of a pond, wetlands, or floodplain since such permitting is not anticipated to be required. Additionally, the scope does not include topographic or existing conditions surveying, wetlands delineations, bog turtle habitat screening, or historical resources assessments since the work performed on those items during preparation of the Planning Module is expected to be adequate for design and permitting.
Phase 1 – Design
During this phase, Pennoni will prepare the engineering plans and specifications necessary for the diversion of the HMPS force main and the diversion and closure of the RPS. Both diversion projects will be incorporated into one engineering plan set and one set of specifications and bidding documents to result in one construction contract.
The routing and connections of the diversions will be as described above in the “Background” section. The plans and specifications will include existing conditions plans; plans and details of abandonment of the force mains and RPS; plans and profiles of the proposed force main and gravity sewer; details of the connections to existing sewers, road and lawn restoration, sewer appurtenances; and erosion and sediment pollution control plans and details.
Preliminary plans and specifications will be prepared for review by the Township. Following Township approval, the plans and specifications will be used for the permit application submissions to the PADEP (WQM Part 2 Permit and General Permits for Stream Crossings) and Chester County Conservation District (E&SPC Approval).
During the review of the permit applications by the PADEP and County, final plans and specifications will be prepared for bidding and construction.
Phase 2 – Sewer Stakeout and Easements
Pennoni will perform a field survey to stakeout the proposed HMPS force main routing and RPS gravity sewer routing in locations as described above in the “Background” section. The stakeout will be performed to field verify the constructability of the proposed sewers (e.g. evaluate conflicts with existing trees, landscaping, hardscaping, utilities, etc.) and to show property owners the impact of required easements. Pennoni will also prepare legal descriptions and exhibits for permanent easements through a total of six properties (three easements for the proposed HMPS force main and three easements for the proposed RPS gravity sewer).
Rick Smith
July 7, 2011
Page 3
HMPS & RPS Diversions Design & Permitting
Pennoni has previously performed topographic and existing conditions field surveying along the routes of the proposed sewers so no further topographic or existing conditions surveying is included in this scope of work.
Phase 3 – Property Boundary Survey Allocation
Pennoni will verify property boundary and parcel information necessary for the preparation of easements for both diversions. The easements will be prepared as part of Phase 2; however, parcel information needs to be verified since the previous survey was performed nearly two years ago. We will determine if the owners and deeds included on the Planning Module plot plans are current, and we will update the information as necessary if ownership or deed information has changed since the previous survey. If we find that all property information on the plans is accurate and current, the amount of time used from this phase budget will be reduced.
Phase 4 – E&SPC Permitting
During this phase, Pennoni will prepare the application and supporting documents for an Erosion & Sediment Pollution Control (E&SPC) Approval from the Chester County Conservation District (CCCD). Pennoni will attend a pre-application meeting with the CCCD. We will prepare the application forms and E&SPC Narrative(s). The E&SPC design plans developed in Phase 1 will be submitted with the E&SPC application package(s).
Since there will be less than 1 acre of construction disturbance on each diversion, NPDES permitting is not anticipated to be necessary and is not included in this scope of work.
Phase 5 – Water Quality Management Part 2 Permitting
During this phase, Pennoni will prepare the application and supporting documents for a Water Quality Management (WQM) Part 2 Permit from the PADEP for the HMPS Diversion only. Since the HMPS Diversion services over 250 EDU’s and involves continued use of a pump station, PADEP’s regulations require a WQM Part 2 Permit. The RPS Diversion, on the other hand, services less than 250 EDU’s and does not involve continued use of a pump station so it is anticipated that PADEP will not require a WQM Part 2 Permit for that diversion.
Pennoni will attend a pre-application meeting with the PADEP to determine the specific permitting requirements. Based upon PADEP’s standard permitting procedures, this phase will consist of preparation of a General WQM Part 2 Permit application including the General Information Form, Design Engineer’s Report, Act 14 Notifications, and Sewer Extensions Module 2 or 17. The design plans and specifications developed in Phase 1 will be submitted with the application package. After a WQM Part 2 Permit is obtained, we will prepare a letter to PADEP requesting termination of the existing RPS Permit. The scope does not include preparation of Module 13 for Stream Crossings since the stream crossings are anticipated to be addressed via the PADEP General Permits in Phase 5.
Rick Smith
July 7, 2011
Page 4
HMPS & RPS Diversions Design & Permitting
Phase 6 – PADEP General Permits
Pennoni will prepare two General Permit GP-5 Utility Line Stream Crossings applications and two General Permit GP-8 Temporary Road Crossings applications (one stream crossing for each diversion) and submit to PADEP. The design plans developed in Phase 1 will be submitted with the application package(s) to fulfill the requirement for “sketch plans”. Cross-sections will be developed. We will also perform new PNDI searches. The scope does not include addressing any comments that may result from the PNDI search, since such work was already performed as part of the Planning Module. Additionally, the scope does not include any investigations for impacted drinking water intakes or reservoirs or preparation of a pollution control plan since such work is not anticipated to be necessary.
Phase 7 – Bid Assistance
During this phase, Pennoni will provide assistance to the Township during the construction solicitation period at the hourly rates approved for Pennoni in 2011. The anticipated scope includes: attendance at a pre-bid meeting, preparation of additional bid packages as needed, responding to RFI’s, review and tabulation of bids, reference checks, and recommendation of award. This phase is included as an approximated budget.
Phase 8 – Additional Meetings
During this phase, Pennoni will attend meetings as requested by the Township at the hourly rates approved for Pennoni in 2011. Additional meetings may include: public meetings; meetings with property owners about easements; and progress review meetings with the Township, PADEP, CCCD, or other regulatory agencies. The E&SPC pre-application meeting with the CCCD and the WQM Part 2 Permit pre-application meeting with the PADEP are not included in this phase, but any follow-up meetings with the agencies will be considered part of this phase. This phase is included as an approximated budget.
Rick Smith
July 7, 2011
Page 5
HMPS & RPS Diversions Design & Permitting
SCHEDULE
We have prepared the Proposed Project Schedule below. The Proposed Project Schedule includes task durations based on our experience and anticipated review times published by PADEP and CCCD. The actual schedule may vary depending on PADEP and CCCD input, scheduling of agency meetings, review comments, etc.
| Task | Contract Day |
|---|---|
| Notice to Proceed | 1 |
| Preliminary Plans and Specifications | 60 |
| Sewer Stake-out | 60 |
| Easements | 75 |
| Submit E&SPC Application | 75 |
| Submit WQM Part 2 Permit Application | 75 |
| Submit GP-5 & GP-8 Applications | 75 |
| E&SPC Approval (60 days) | 135 |
| GP-5 & GP-8 Approval (120 days) | 195 |
| WQM Part 2 Permit Issuance (120 days) | 195 |
| Finalize Plans and Specifications | 195 |
| Advertise Solicitation | 210 |
| Bid Opening | 240 |
FEE
Our estimated fee, to be billed on a time and material basis, is $60,200.00 broken down by Phase as follows:
| Phase | Fee |
|---|---|
| Phase 1 – Design | $23,200.00 |
| Phase 2 – Sewer Stakeout and Easements | $11,000.00 |
| Phase 3 – Property Boundary Survey Allocation | $5,000.00 |
| Phase 4 – E&SPC Permitting | $3,600.00 |
| Phase 5 – Water Quality Management Part 2 Permitting | $6,000.00 |
| Phase 6 – PADEP General Permits | $3,800.00 |
| Phase 7 – Bid Assistance | $6,000.00 |
| Phase 8 – Additional Meetings | $1,600.00 |
| TOTAL | $60,200.00 |
Work shall be done on an hourly basis, billed at the Authority’s approved rates for Pennoni for 2011.
Extraordinary expenses, authorized in advance and identifiable to the specific project will be billed in addition to the above stated fees. These expenses include, but are not limited to: permit application fees, Federal Express and delivery charges, and the reproduction of plans and specifications by outside services. We do not bill for such items as relatively small amounts of in-house printing, mailing expenses, reasonable telephone calls, and travel expenses.
Rick Smith
July 7, 2011
Page 6
HMPS & RPS Diversions Design & Permitting
BILLING AND PAYMENT
Fees will be billed monthly based on actual services completed. Payment is due upon receipt of invoice. Billing and Payment shall be in accordance with Item three (3) of the attached General Terms and Conditions.
The client acknowledges that the method of Billing and Payment has been discussed in detail; that the terms agreed upon can only be changed by a written addendum agreed to by both parties; and work may be stopped until payment is made in accordance with the agreement.
TERMS AND CONDITIONS
General
Pennoni Associates Inc. General Terms and Conditions (Form No. LE01, Rev. 09/2002) are attached hereto and are considered as part of this proposal.
Special
- We will perform our work in accordance with accepted engineering standards. However, we cannot guarantee approvals by permitting agencies as these approvals are subject to circumstances beyond our control.
- Revisions to the plans as may be required by personal preferences of reviewers, reviewing agencies, agency consultants, and the client will be performed as additional work on an hourly basis.
- The proposed projects are understood to be clear of rare, threatened, and endangered species as identified by the Pennsylvania Department of Natural Resource Conservation (DCNR) and archeological and historic resources as identified by the Pennsylvania Historic and Museum Commission (PHMC).
- This proposal is limited strictly to those items quoted above. Application fees and other costs payable to regulatory agencies will be the responsibility of the Client.
We appreciate this opportunity to submit our proposal to the Township. Should you have any questions or need additional information, please do not hesitate to call. Please sign and return one (1) copy of this proposal as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
Daniel P. Barbato, P.E.
Authority Engineer
Rick Smith
July 7, 2011
Page 7
HMPS & RPS Diversions Design & Permitting
Enclosures: As Stated
ACCEPTED BY: _____________________________________
_____________________________________
(Print Name and Title)
DATE: _____________________________________
P:\Projects\EGMA\EGMA0704 PS Special Study\Proposal\Design & Permitting\HMPS & RPS Diversion Design & Permitting PROPOSAL.doc