Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
MA Minutes 01/10/2011 1
1 EAST GOSHEN TOWNHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 January 10, 2011 4 5 The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday 6 January 10, 2011 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: 7 Jack Yahraes, Fran Beck, Dana Pizarro, Joseph McCawley and Kevin Cummings. Also in 8 attendance were: Rick Smith, Township Manager; Dave Evans from Brickhouse Environmental; 9 Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; and Jim Hopkins and Bill Ronyack 10 from Miller Environmental. 11 12 COMMON ACRONYMS: 13 MA- Municipal Authority I&I – Inflow & Infiltration 14 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 15 PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant 16 CB – Conservancy Board DEP – Department of Environmental Protection 17 PR – Park & Recreation Board EPA – Environmental protection Agency 18 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 19 SSO – Sanitary System Overflow WAS – Waste Activated Sludge 20 21 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 22 Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the 23 Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. 24 25 2. ELECTION OF OFFICERS 26 Jack moved to elect the following officers for 2011: 27 Joe McCawley – Chairman 28 Dana Pizarro – Vice Chairman 29 Fran Beck - Secretary 30 Jack Yahraes – Treasurer 31 Kevin Cummings – Assistant Sec. & Treas. 32 33 3. RIDLEY CREEK REPORTS 34 A. Brickhouse Report 35 Dave reported that minimal progress was completed towards the electrical and 36 general/mechanical punch list items during December, however, both contractors addressed 37 equipment issues identified during the month. The remaining items include the short circuit 38 protection, coordination and arc flash studies labels for non-potable water hydrants, 39 replacing two hour meters, instrument panel lamp and adjustment knob for a dissolved 40 oxygen probe mounting bracket. Additional items were identified and brought to the 41 attention of both contractors. 42 43 The SBR treatment process has been identified to contain excessive filamentous growth 44 which has adversely impacted settleability of the solids within the SBR, and increase in 45 solids in the SBR effluent and accumulation of solids throughout individual unit processes. 46 On site Laboratory test data indicates that the biological processes are performing as 47 intended for nutrient removal. Achievement of the existing permit discharge limitations is 48 anticipated as well as those for the Siemens SBR performance warranty for total nitrogen 49 and phosphorus. Foam control has included removal through a vacuum truck as well as the 50
MA Minutes 01/10/2011 2
application of spray applying sodium hypochlorite to the foam during settle and idle periods. 1 Monitoring the biological activity, reduction in filamentous growth and plant performance is 2 ongoing. Improvement in the settleability is anticipated by the end of January. 3 4 The Siemens warranty performance testing of the treatment system has been postponed until 5 the treatment process is performing as intended. The centrifuge dewatering system 6 performance testing is rescheduled for January 10, 2011. Continued informal conversations 7 with the facility inspector from PADEP have included implementing the new NPDES final 8 effluent discharge requirements during the first quarter 2011 (March/April timeframe). 9 Prior to implementing the new discharge permit limitations, representatives from PADEP 10 will be invited to visit the facility, review operations and provide official notification of the 11 start date for the new effluent discharge permit limitations. 12 13 On January 1, 2011 participated in the transition and orientation of plant operation and 14 maintenance responsibilities to Miller Environmental. 15 16 B. Pennoni – Dan Barbato, reported the following: 17 RCSTP Upgrade and Expansion 18 • Construction phase services have transitioned to punch list monitoring, final review 19 of operations and maintenance submittals, and startup assistance and 20 troubleshooting, as well as the continuation of progress meetings with the 21 Contractors and Township, coordination and communication with Brickhouse and 22 the Township, and approval of contractor Payment Requests. 23 • A breakdown of effort expended over the past month by Pennoni is provided with 24 the invoice detail under separate cover. 25 • A request for supplemental budget to cover the extension of our Continued 26 Construction Services is submitted under separate cover. 27 • Worth and Company and Clinger Corporation are working on punch list completion 28 and outstanding items are expected to be complete this month. 29 • Pennoni has completed review of the Operations and Maintenance submittals for 30 Worth and Clinger and has provided comments back to both contractors. We revised 31 submittals from Worth on January 5. 32 • Pennoni will begin working on the renewal for the discharge permit, which expires 33 in September. DEP was contacted for paperwork. Paperwork was received. $500 34 renewal fee needs to be submitted in March, 180 days before September. 35 36 • I / I Metering Project 37 • The Township continues to meter flows at selected locations. Meters are in 38 operation at new locations as recommended, and we will review all meter data as it is 39 submitted. 40 41 Ridley Creek Consent Order 42 • The next report is due to DEP in March of 2011. No comments were received to 43 date on the September report submitted to DEP.. 44 45 LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning 46 • We received an extension from DEP to complete the response to their comments by 47 February 28, 2011. Several of the DEP comments require action by West Goshen 48
MA Minutes 01/10/2011 3
including adoption of a Resolution, review by the Planning Commission, and flow 1 data from the Authority. The extension will allow for time to obtain and submit the 2 required Resolution and other documentation. We have completed all revisions to 3 the narrative and prepared a comment response letter, and we are only awaiting 4 required documentation from West Goshen, East Goshen Planning Commission, and 5 the Chester County Health Department before formally submitting to DEP. We 6 have forwarded the documentation required by West Goshen and East Goshen under 7 separate cover. We will be informally submitting the revised narrative and comment 8 response letter to DEP this week so they can begin their review prior to the formal 9 submission in February. 10 11 Marydell PS Elimination Planning 12 • The draft report for the Act 537 Plan Revision is nearly complete. We will submit 13 the draft report to the Authority for review by the end of January. Following the 14 Authority’s review, we will make the required Component 4 submissions to the East 15 Goshen Planning Commission, West Goshen Planning Commission, Chester County 16 Planning Commission, and Chester County Health Department. 17 18 Applebrook Comprehensive Groundwater Evaluation 19 * The final report was provided to the Authority for submission to DEP. 20 21 Dan reported regarding Lochwood, that the DEP issued a renewal permit. The DEP 22 representative acknowledged that DEP knows we are abandoning the plant. There 23 should be no fee, so don’t send any money. 24 25 C. Miller Environmental Report 26 Report from Bill Ronyack – The first of the samples taken Wednesday the 5th of January by 27 Atlantic Coast Lab will be analyzed and reported along with all others in each succeeding 28 report. This will include copies of the E-DMR. 29 30 Miller Environmental is in the process of analyzing and preparing all records, 31 documentation, procedures to ensure permit compliance and efficient plant operation. The 32 next month should include Siemans’ performance evaluation and Alfa/Laval centrifuge 33 training. 34 35 Filamentous bacteria removal/control is underway and new set points for control are being 36 considered. New lab equipment has been ordered and received and standard operating 37 procedures are being developed. 38 39 Mark Miller and his crew have been invaluable in efforts to restore the WWTP to conditions 40 prior to the Alum incident. 41 42 D. Cost Summary – The Cost Summary was reviewed. 43 44 E. Change Orders – None 45 46 F. Other – Pennoni presented an estimate of fees required to reach the January 31 47 anticipated completion date as follows: 48 49
MA Minutes 01/10/2011 4
October 15 – December 15 1 Additional progress meetings (3 meetings at 24 hrs total) = $2,400 2 Construction observation (Matt McAloon only) (90 hrs total) = $6,750 3 Response and assistance for two electrical/power outages (23 hrs total) = $1,800 4 TOTAL = $10,950 5 6 December 15 – January 31 7 1 meeting (8 hrs total) = $800 8 Construction observation (Matt McAloon) (30 hrs total) = $2,250 9 TOTAL = $3,050 10 11 The estimated effort to complete the above items is $14,000. Fran moved to pay the total of 12 $14,000. Jack seconded the motion. There was no further discussion. The motion passed 13 unanimously. 14 15 F. Other – Rick had no response from Worth & Company to his December 28th letter. 16 17 F. Other – PECO Damage to TVSS unit - On December 9, 2010, PECO Energy was 18 installing new power lines along East Boot Road when they came in contact with the 19 existing power lines. This created a surge which caused the damage at the plant. Mark 20 Miller filed a claim with PECO and will be meeting with them to discuss it. Clinger has 21 submitted an invoice for their services totaling $16,059.00. Jack moved to pay Clinger 22 $16,059 for their services. Fran seconded the motion. There was no further discussion. The 23 motion passed unanimously. 24 25 4. RCSTP INVOICES 26 A. Brickhouse Environmental #5706, 1/3/11, $15,640.00. Dana moved to approve 27 payment. Fran seconded the motion. There was no further discussion. The motion passed 28 unanimously. 29 B. Pennoni, #459101, 12/22/10, $8,722.35. Fran moved to approve payment. Dana 30 seconded the motion. There was no further discussion. The motion passed unanimously. 31 32 5. CHAIRMAN’S REPORT 33 A. Jack reported that he attended the West Goshen meeting. The attorney for Goose 34 Creek suggested that they change to PMAA attorney Steve Hahn for federal court. East 35 Goshen is paying 16% of the cost. 36 37 6. APPROVAL OF MINUTES 38 A. Jack moved to approve the minutes of the December 13, 2010 meeting as corrected. 39 Dana seconded the motion. The motion passed unanimously. 40 B. Dana moved to approve the minutes of the December 28, 2010 special meeting. Jack 41 seconded the motion. The motion passed unanimously. 42 43 44 45 46 7. APPROVAL OF INVOICES 47 A. Jack moved to approve payment of the following invoices: 48 1. Pennoni, #459104, 12/22/10, $866.25 49
MA Minutes 01/10/2011 5
2. Pennoni, #459105, 12/22/10, $1,070.97 1 3. Pennoni, #459099, 12/22/10, $795.00 2 Dana seconded the motion. The motion passed unanimously. 3 4 8. LIAISON REPORTS 5 A. Historical Commission - Ellen Carmody reported that some Commission members will 6 participate as judges in the National History Day competition in March at Immaculata. 7 8 9. FINANCIAL REPORTS 9 Financial reports were reviewed. 10 11 10. GOALS 12 Newsletter article assignments for 2011 with the “due date” are: 13 Feb. 9 – Joe 14 May 11 – Fran 15 August 10 – Jack 16 November 9 – Dana 17 February 2012 – Kevin 18 Rick provided a summary of 2010 goals. 19 20 11. OLD BUSINESS 21 None 22 23 12. NEW BUSINESS 24 A. Email policy – The chairman will be assigned an email address 25 (MAchair@eastgoshen.org). All Authority members who email using their personal email 26 for Township business, must cc the chairman or any township staff member so it will be 27 archived. 28 B. Municipal Authority members and BOS liaison will still receive hard copies of the 29 meeting packets. Other ABC liaisons will get it electronically. 30 C. Joe provided a proposed Fact Sheet for Municipal Authority information that he 31 suggested be put on the website. Rick will look into it. 32 33 13. CAPACITY REQUESTS 34 None 35 36 14. SEWER REPORTS 37 A. Mark Miller reported the following: 38 Meters – Allied Control was out to calibrate the meters. They made some minor 39 adjustments to the Ellis Lane meter. The other meters were fine. 40 41 CC Collection – We were notified of two lateral clogs, one was in Mary Dell and the 42 other was at the Reserve at Spring Meadows. Both were cleared. 43 44 Pump Stations – Pump station wet wells were cleaned as part of the maintenance 45 program. 46 47 RC Collection – Two sewer caps were placed in Clock Tower. 48 49
MA Minutes 01/10/2011 6
Lochwood Plant – The plant was visited on a routine basis. 1 2 Ridley Creek Plant – It has been a very busy month at the plant as we experienced 3 several problems with the SBR operation. See Brickhouse report. 4 5 Pa One Calls – 50 PA One Calls were received for the month of December. 6 7 Alarms – 27 alarms for the month of December. A float alarm was received at the 8 Ashbridge Station for high level. We were able to isolate the problem and replaced 9 the float. 10 11 15. ANY OTHER MATTER 12 None 13 14 16. CORRESPONDENCE 15 Joe acknowledged receipt of West Goshen minutes and a letter from Bob Adams accepting 16 re-appointment as solicitor for the Authority. 17 18 17. PUBLIC COMMENT 19 None 20 21 18. ADJOURNMENT 22 There being no further business, Jack moved to adjourn the meeting. Fran seconded the 23 motion. The meeting was adjourned at 8:30 p.m. 24 25 Respectfully submitted, 26 27 28 Ruth Kiefer, Recording Secretary 29 30 C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2011\MA 01-10-11 final.doc 31