Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
June 14, 2010
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental -; Pennoni –; Costs Summary; Change Orders; Worth & Company, Inc.,; Tank Cleaning Bid
- RIDLEY CREEK INVOICES a. Hammond & McCloskey, #4513, 5/5/10 $ 1,078.38 b. Hammond & McCloskey, #4523, 5/5/10 $ 270.10 c. Pennoni, #440011, 5/25/10 $ 19,287.50 d. Fisher Scientific, #3461600, 4/26/10 $ 2,329.17 e. Fisher Scientific, #3781979, 5/12/10 $ 1,485.63 f. Aqua Wastewater Mgt, #161112, 5/15/10 $ 39,937.70 g. USA BlueBook, #155755, 5/21/10 $ 456.81 h. Gawthrop Greenwood, #79963, 5/31/10 $ 665.00 i. Gawthrop Greenwood, #79964, 5/31/10 $ 836.00 j. Marco, #064873, 4/29/10 $ 258.00 k. Worth and Company, #P28001, 5/31/10 $178,290.62
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES May 10, 2010; May 20, 2010; June 7, 2010
- ENGINEER’S REPORT Pennoni report
- APPROVAL OF INVOICES a. General Fund reimbursement, Staples, 5/20/10 $ 142.47 b. Gawthrop Greenwood, #79415, 4/30/10 $ 627.00 c. Gawthrop Greenwood, #79416, 4/30/10 $ 1,083.00
- LIAISON REPORTS
- FINANCIAL REPORTS
- GOALS
- OLD BUSINESS Chester Creek Sewage Collection System Modeling
- NEW BUSINESS Memo – Ridley Creek Sewer Plant Project Outstanding Issues
Monday, June 14, 2010
- 1 -
- CAPACITY REQUESTS
- SEWER REPORTS Director of Public Works Report – May 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports; Artesian Ridley Creek Report
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| August 11, 2010 | October 1, 2010 |
| November 10, 2010 | January 1, 2011 |
Monday, June 14, 2010
- 2 -
2 RIDLEY CREEK RPTS
b.
8 pgs
Project Manager’s May 2010 Report
Executive Summary
Commencement of phase II of the Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project progressed with the completion cleaning of the existing DAVCO treatment tanks. Aqua Wastewater Management, Inc. was contracted to remove and dispose of the sludge, grit and debris remaining in the treatment tanks after transfer of mixed liquor suspended solids (MLSS) to the new sequential batch reactors (SBRs). Demolition of existing main components included the removal of all lift station and forward flow EQ tank pumps, demolition of the previous influent lift station, clarifier drive mechanisms and related equipment, aeration tank drop piping and diffusers and the up flow sand filters. Refurbishment of the existing DAVCO treatment tanks to serve as treated effluent flow equalization and sludge holding tanks was initiated. Progress during May and the first week of June included complete refurbishment of DAVCO treatment tank number one (1) and initiation of the sand blasting and painting. Substantial progress was completed towards the installation of the underground piping linking the SBR effluent piping to the existing DAVCO tanks. The new sludge dewatering building concrete floor was cast in place and the construction of the masonry walls commenced on June 10th.
Operation of the SBRs and related equipment continued during the month. The manufacturer, Siemens, continued to coordinate with the Plant Operator to implement adjustments to the treatment plant system program and programmable logic controller (PLC). Regulatory compliance with the existing NPDES discharge permit for the month of May is not expected as the result of slightly elevated ammonia as nitrogen concentrations in the effluent. Improvements towards nitrification and ammonia as N removal are anticipated as the treatment process and programmable set points are adjusted for actual site conditions.
Key administrative and contractual items completed during the month included the acceptance and approval of Worth & Company change orders 001, 002, and 003 by the Municipal Authority. Included as part of the change orders, the overall substantial completion date was extended from June 30, 2010 to July 13, 2010. The Authority received a response from Pennoni Associates, Inc. regarding the Clinger letters dated March 15, 2010 and April 30, 2010. A meeting with representatives from Clinger and Pennoni was scheduled for June 11, 2010 to develop a solution for presentation to the Authority.
2 of 8
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
To: East Goshen Municipal Authority Members
From: Scott A. Towler, P.E., Project Manager
Dave W. Evans, Project Manager
CC: Evans Andrews, P.E., Authority Engineer
Date: June 10, 2010
Re: May 2010 – Project Manager Report for the Ridley Creek Capital Expansion Project:
I. General Construction
- Influent Meter Vault All work has been completed and the influent flow meter was placed in service May 5, 2010.
- Influent Lift Station All work has been completed and the influent flow meter was placed in service May 5, 2010.
- Manhole Number 1 No change in status
- Storm Water Bio Retention Pond Adjacent to Manhole No. 1 No change in status
- Screening Building The screening building, grinder and fine screen were placed in service May 5, 2010.; Relocation of the transfer fan approximately 3 vertical feet remains to be completed to prevent the fan from submergence in the event of flooding of the lower section of the screen building.; Accumulation of grit and debris has been observed in the open channel prior to the grinder. The channel was cleaned on June 8, 2010 and will be monitored. Presently, removal of the grit and debris will require manual labor with appropriate safety precautions.
- Influent Force Main to SBRs No new activity.
Page 1 of 7
3 of 8
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
- SBR Effluent Discharge & Disc Filter Feed Suction Piping On May 27, 2010, Trinity Excavation Company (TEC) installed the underground fourteen (14) inch piping from the existing control building to DAVCO No. 1.; Trinity Excavation Company (TEC) installed the fourteen (14) inch disc filter feed pump suction piping from the existing control building to the each of the existing DAVCO treatment tanks.; On June 8, 2010, TEC excavated the trench for the installation of the sixteen (16) inch ductile iron pipe from the SBRs to the existing DAVCO treatment tank number two (2).; Pressure testing of the disc filter feed suction piping is scheduled for the week of June 14, 2010.
- Flocculation Tank Two (2) remaining section of FRP require installation adjacent to the floc mixer.; Adjustment of the FRP decking parallel to the new treatment building remains to be completed.
- Disc Filters and Associated Equipment All work has been completed and the disc filters were placed in service May 5, 2010.; On June 7, 2010, Aqua Aerobics completed the replacement of all four (4) back wash valves on both disc filters. The work was performed as warranty work.; The Aqua Aerobics representative lowered the high level mounting bracket and float. The previous elevation setting allowed for the water level in the tank to rise and flow through the filter bypass without prompting for backwashing the disc filters. The water quality has improved.; Water has been observed to be present in the back wash pump oil reservoir sight glass for disc filter number 1. The manufacturer has been notified of the issue and to correct the problem.
- SBR Basins All work has been completed and three (3) of the four (4) SBRs were placed in service May 5, 2010.; On May 24, 2010, EGTMA Staff transferred MLSS from SBR No. 2 to SBR No. 3 to drain SBR No. 2. The objective was to perform an inspection of SBR No. 2 as part of investigating the discharge of MLSS from SBR No. 2 during a decant cycle. No malfunction was observed.; SBR Process Adjustments were implement as per Siemens: May 28, 2010 The air slope was increased to from 180 to 220.; May 28, 2010 The air slope was increased to from 180 to 220.; The air slope was increased to from 180 to 220.
Page 2 of 7
488
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
- The anoxic multiplier was reduced from 1.0 to 0.8.
- June 2, 2010 The anoxic multiplier was reduced from 0.8 to 0.7.
- June 4, 2010 The anoxic fill time was reduced from 70 minutes to 60 minutes.; The WAS setting was increased from 3.0 to 3.5 minutes.
- June 7, 2010 The maximum anoxic time was reduced from 60 minutes to 50 minutes.
- June 9, 2010 The air slope was increased from 220 to 230.; The minimum aeration time was increased from 90 to 120 minutes.
- SBR Equipment Pennoni Associates provided Wm. H. Clinger wiring diagrams and guidance for the termination of the motor operated valves included as part of the aluminum sulfate chemical feed system to the individual SBRs.
- Treatment Building On June 9, 2010, the concrete apron for the overhead garage door was cast in place.
- Treatment Building Roof No new activity
- UV Disinfection System All work has been completed and the disc filters were placed in service May 5, 2010.; A loose wire was determined to correct the previous problem identified with UV bank No. 1. Both UV banks were placed in service on May 28, 2010 to ensure adequate disinfection during a SBR decant cycle.; Continuous monitoring of the effluent water temperature at the discharge side of the UV lamps is ongoing.
- Effluent Collection Box No new activity.
- Effluent Overflow Box No new activity.
Page 3 of 7
5 of 8
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
- Utility Water Piping The non-potable water system was placed in service.; The Authority Staff furnished and installed wall mounted hose reels, including hose within the Screen and New Treatment Buildings.
- Apple Brook Discharge No new activity.; The pump is anticipated to be returned to service with when one effluent flow equalization basin is placed in service (possibly the end of June 2010).
- Electrical Clinger had no scheduled Staff or employees on site during May.; Matt Burke was dispatched to RCSTP on May 28, 2010 to address issues with the influent lift station and floc tank mixer. Both issues were resolved and the equipment returned to service.; Wm. H. Clinger Corporation work crews are scheduled to return to the site on June 21, 2010. Clinger estimates four (4) weeks to complete the electrical equipment installation.
- Rehabilitation of the existing Aeration Blowers Blower number 4 was delivered and installed.
- New Sludge Dewatering Building On May 24, 2010, TEC began excavation of the foundation for the new sludge dewatering building.; On May 25, 2010, Heim Contractors were on site preparing the forms for the building cast-in-place footers.; On June 1, 2010, Heim Contractors is on site placing the block for the dewatering building foundation. The work was completed on June 1 st .; On June 2, 2010, the three courses of concrete block for the foundation were filled with concrete. Two (2) cylinders were collected for testing.
- DAVCO Tank Cleaning & Refurbishment On May 6, 2010, Aqua wastewater Management, Inc. began cleaning DAVCO treatment tanks number two (2).; On May 10, 2010, DAVCO treatment tank number two (2) was cleaned of liquid waste. The clarifier section was completely cleaned. The aeration tank section contained grit which was being removed.; On May 14, 2010, Aqua Wastewater Management completed cleaning, removal and disposal of the contents in both DAVCO treatment plants.; On May 24, 2010, installation of the fourteen (14) and sixteen (16) inch pipe flanges on the exterior of the tanks on DAVCO No. 1 were
Page 4 of 7
6 of 8
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
completed. The openings in the wall between the aeration and sludge tanks to join the tanks together were cut in place.
- On May 27, 2010, installation of the fourteen (14) and sixteen (16) inch pipe flanges on the exterior of the tanks on DAVCO No. 2were completed.
- On June 2, 2010, the drain lines from the clarifier which transect the former aeration section of the DAVCO tanks was replaced and welded in place for both DAVCO tanks.
- On June 2, 2010, DAVCO tank No. 1 is ready for sandblasting and painting.
- On June 2, 2010, observation of the waste activated sludge pipe flanges for both DAVCO tanks were welded in place.
- Demolition Demolitions of the influent lift station commenced on May 8, 2010. The influent pumps, motors and grinder were removed. Observations on May 10, 2010 included removal of all piping, valves and the door and frame.; On May 24, 2010, the lift station was observed to have been backfilled and leveled.; On May 20, 2010, demolition of DAVCO treatment tank clarifier number one (1) was completed. The pipe penetrations through the clarifier walls were sealed with steel plates welded to cover the openings.; On May 24, 2010, the removal of the aeration drop pipes and diffusers was completed in DAVCO NO. 1.; On May 24, 2010, the removal of the aeration drop pipes and diffusers was completed in DAVCO NO. 2.; On May 27, 2010, the Parkson up flow sand filters were removed for disposal.; On June 2, 2010, demolition of the forward flow pumps, piping and concrete equipment pads was completed.
- Erosion and Sediment Controls East Goshen Township Municipal Authority Worth & Company, Inc. continues to perform inspections of the E&S controls as required after a storm event.
II. Payment Requests
- Worth & Company pencil payment review was conducted on June 3, 2010. Worth & Company was instructed to include information regarding the approved change orders on the request for payment application.
- There was no payment request review conducted for Wm. H. Clinger Corporation.
Page 5 of 7
7 of 8
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
III. Release of Liens
- Release of liens for equipment and subcontractors for Worth & Company are current.
- Copies of the release of liens for equipment and subcontractors for Wm. H. Clinger Corporation have been requested. The release of liens for equipment and subcontractors for Wm. H. Clinger Corporation are reported to be current.
IV. Meetings
- On May 13, 2010, the weekly progress meeting was conducted at the RCSTP site.
- On May 10, 2010, the East Goshen Township Municipal Authority conducted its monthly meeting.
- On May 19, 2010, prepared for and attended a meeting with Worth & Company and the East Goshen Township Municipal Authority to discuss proposed Worth & Company change orders 1 and 2. Change order number 1 was resolved and change order number 3 presented to Worth and Company.
- On May 20, 2010, the East Goshen Township Municipal Authority conducted a special meeting to discuss and approve Worth and Company PCO-19, PCO-20, PCO-21, PCO-22 and add eleven (11) days to the schedule.
- On May 27, 2010, the weekly progress meeting was conducted at the RCSTP site.
V. Correspondence
No formal letters were issued during the month
VI. Extras Identified During the month
- Worth & Company provided the Municipal Authority the executed change order number 001. There was a result of a credit to the Authority of $42,648.25 which resulted in an adjusted contract value of $7,822,751.75
- The East Goshen Township Municipal Authority approved change order 002 for Worth & Company. There was a result of a credit to Worth & Company of $11,234.03 which resulted in an adjusted contract value of $7,833,985.78.
- The East Goshen Township Municipal Authority approved change order 003 for Worth & Company. There was a result of a credit to Worth & Company of $35,438.56 which resulted in an adjusted contract value of $7,869,424.24.
Page 6 of 7
8 of 8
East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report
Potential Receipts Pending
- Worth & Company credit for the reduced labor and schedule regarding the installation of the frost barrier within the internal perimeter of the new treatment building.
- Discussion of the cost benefits to Worth & Company regarding the BFP and construction of a temporary structure are recommended.
VII. Issues for Reconciliation
- Aqua Aerobics disc filter control panel was observed to produce a “basin transducer level out of range” alarm. Worth & Company is coordinating with Aqua Aerobics to correct the deficiency.
- Siemens SBR Operational issues regarding low dissolved oxygen concentrations. The Plant Operator is coordinating with Siemens to adjust the process. Influent wastewater monitoring and process control testing will assist in resolving the problem.
- Pennoni Associates, Inc. formal letter response to East Goshen Township Municipal Authority regarding Clinger’s March 15, 2010 letter.
- Clinger issued a letter dated April 30, 2010 to the East Goshen Township Municipal Authority explaining that they are proceeding with the installation of the conduit within the duct bank between the existing control building and new treatment plant. They also claim their position that the work is not included as part of the original plans as prepared by Pennoni Associates, Inc.
- Worth & Company issued a letter dated February 15, 2010 requesting for a substantial completion date of September 30, 2010.
- Worth and Company change orders for the structural steel modifications to the new treatment and screening buildings.
VIII. Concerns to Monitor
- Grit and debris accumulation in the influent flow channel prior to the grinder and screening unit.
- Performance of the SBR treatment process, specifically dissolved oxygen concentrations, aeration time, organic loadings and process control.
- Alkalinity feed system.
- Separation of the internal recycles flow volumes from the influent flow meter for accurate determination of the influent flows.
IX. Start-up
No dates have been established for the treated effluent storage, sludge holding, disc filter feed pumps or centrifuge dewatering system start up and training.
Page 7 of 7
2. RIDLEY CREEK RPTS
C.
8 pgs
SUMMARY V2
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY
June 9, 2010
Includes bills paid at 5/10 and 5/20 meetings
| Name | Budget or Contract amt. |
This Month | To Date | Balance | % of work completed |
|---|---|---|---|---|---|
| EXPENSES | |||||
| Borrowing costs | $52,250.00 | $0.00 | $52,250.00 | $0.00 | 100.00% |
| Worth | $7,865,400.00 | $170,263.75 | $6,235,671.75 | $1,629,728.25 | 79.28% |
| change orders | -$7,332.91 | $0.00 | $0.00 | -$7,332.91 | 0.00% |
| Clinger | $974,000.00 | $34,539.38 | $837,199.44 | $136,800.56 | 85.95% |
| change orders | $31,862.00 | $0.00 | $0.00 | $31,862.00 | 0.00% |
| Pennoni (Inspection) (05) | $136,200.00 | $0.00 | $136,197.62 | $2.38 | 100.00% |
| Pennoni (Continued Services) (10) | $99,700.00 | $19,243.40 | $91,817.98 | $7,882.02 | 92.09% |
| Pennoni (Rechargeable) (06) | $20,000.00 | $0.00 | $12,961.75 | $7,038.25 | 64.81% |
| Brickhouse | $175,000.00 | $11,931.25 | $102,637.50 | $72,362.50 | 58.65% |
| Extras | |||||
| Capital | $87,224.91 | $0.00 | $47,461.42 | $39,763.49 | 54.41% |
| Capital (Identified but not paid) | $73,696.00 | $0.00 | $0.00 | $73,696.00 | 0.00% |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $711.15 | $10,509.95 | $1,490.05 | 87.58% |
| EXPENSES TOTAL | $9,520,000.00 | $236,688.93 | $7,526,707.41 | $1,993,292.59 | 79.06% |
| RECEIPTS | |||||
| Pennoni (Rechargeable) | -$20,000.00 | $0.00 | $0.00 | -$20,000.00 | 0.00% |
| NET | $9,500,000.00 | $236,688.93 | $7,526,707.41 | $1,973,292.59 | |
Retainage (10% until 50% of the project is done then it drops back to 5%)
| Worth | $328,193.25 | 5% |
|---|---|---|
| Clinger | $42,245.28 | 5% |
| Total | $370,438.53 |
We have identified $146,357 in potential extras.
We also have $464,195 in Grant Money available
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
2 of 8
DETAIL
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL
June 9, 2010
| Category | Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|---|
| Worth | 2/9/2009 | $561,150.00 | Worth & Company | Application #1 | |
| 3/9/2009 | $480,825.00 | Worth & Company | Application #2 | ||
| 4/9/2009 | $768,780.00 | Worth & Company | Application #3 | ||
| 5/8/2009 | $125,352.90 | Worth & Company | Application #4 | ||
| 5/31/2009 | $485,103.12 | Worth & Company | Application #5 | ||
| 6/30/2009 | $267,975.00 | Worth & Company | Application #6 | ||
| 7/31/2009 | $138,217.50 | Worth & Company | Application #7 | ||
| 8/31/2009 | $679,793.40 | Worth & Company | Application #8 | ||
| 9/30/2009 | $504,310.98 | Worth & Company | Application #9 | ||
| 9/30/2009 | $222,861.55 | Worth & Company | Application #10 (5% retainage) | ||
| 10/31/2009 | $724,089.05 | Worth & Company | Application #11 | ||
| 11/30/2009 | $379,360.17 | Worth & Company | Application # 12 | ||
| 12/31/2009 | $374,772.62 | Worth & Company | Application #13 | ||
| 1/31/2010 | $207,881.86 | Worth & Company | Application # 14 | ||
| 2/28/2010 | $69,077.35 | Worth & Company | Application # 15 | ||
| 3/31/2010 | $75,857.50 | Worth & Company | Application # 16 | ||
| 4/30/2010 | $170,263.75 | Worth & Company | Application # 17 | ||
| $6,235,671.75 | $6,235,671.75 | ||||
| Clinger | 4/9/2009 | $22,152.64 | Clinger | Application #1 | |
| 5/8/2009 | $15,714.77 | Clinger | Application #2 | ||
| 5/31/2009 | $77,973.43 | Clinger | Application #3 | ||
| 6/30/2009 | $12,567.46 | Clinger | Application #4 | ||
| 8/30/2009 | $10,855.98 | Clinger | Application #5 | ||
| 9/30/2009 | $111,255.75 | Clinger | Application #6 | ||
| 10/31/2009 | $59,344.83 | Clinger | Application #7 | ||
| 11/30/2009 | $145,354.05 | Clinger | Application # 8 | ||
| 12/31/2009 | $94,727.00 | Clinger | Application # 9 | ||
| 1/31/2010 | $139,092.94 | Clinger | Application #10 | ||
| 2/28/2010 | $58,514.64 | Clinger | Application #11 | ||
| 2/28/2010 | $41,530.78 | Clinger | Application #12 (5% retainage) | ||
| $13,575.79 | Clinger | Application #13 | |||
| 5/2/2010 | $34,539.38 | Clinger | Application # 14 | ||
| $837,199.44 | $837,199.44 | ||||
| Pennoni | ? | $712.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU ? | |
| 10/30/2008 | $943.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 10/19/08 | ||
| 12/5/2008 | $18,115.98 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 11/30/08 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
3 of 8
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 1/15/2009 | $12,929.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 12/28/08 | |
| 2/5/2009 | $13,352.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $31,288.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $29,010.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $22,436.46 | PENNONI ASSOCIATES INC. | RCSTP EXP. PROJ. SERV. THRU 4/26/09 | |
| 7/29/2009 | $3,528.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 7/19/09 | |
| 12/30/2010 | $16,482.50 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 12/31/10 | |
| 1/29/2010 | $24,224.58 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 1/17/10 | |
| 2/23/2010 | $13,057.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 2/14/10 | |
| 4/1/2010 | $19,243.40 | PENNONI ASSOCIATES INC. | ||
| 5/5/2010 | $18,810.50 | PENNONI ASSOCIATES INC. | Through 4/18/2010 | |
| $224,134.38 | $224,134.38 | |||
| Pennoni (rechargeable) | ||||
| 2/5/2009 | $2,840.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $4,934.75 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $3,777.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $1,409.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| $12,961.75 | $12,961.75 | |||
| Brickhouse | ||||
| 5/12/2009 | $2,127.50 | BRICKHOUSE | Apr-09 | |
| 6/1/2009 | $8,452.50 | BRICKHOUSE | May-09 | |
| 7/1/2009 | $7,791.25 | BRICKHOUSE | Jun-09 | |
| 8/3/2009 | $9,315.00 | BRICKHOUSE | Jul-09 | |
| 9/1/2009 | $7,762.50 | BRICKHOUSE | Aug-09 | |
| 10/1/2009 | $7,417.50 | BRICKHOUSE | Sep-09 | |
| 11/2/2009 | $7,072.50 | BRICKHOUSE | Oct-09 | |
| 12/1/2009 | $7,963.75 | BRICKHOUSE | Nov-09 | |
| 1/4/2010 | $7,762.50 | BRICKHOUSE | Dec-09 | |
| 2/1/2010 | $7,618.75 | BRICKHOUSE | Jan-10 | |
| 3/1/2010 | $7,417.50 | BRICKHOUSE | Feb-10 | |
| 4/1/2010 | $10,005.00 | BRICKHOUSE | Mar-10 | |
| 5/3/2010 | $11,931.25 | BRICKHOUSE | Apr-10 | |
| $102,637.50 | $102,637.50 | |||
| Extras - Capital - Paid | ||||
| 12/22/2008 | $44.98 | EAST GOSHEN TOWNSHIP | REIMBURSE GEN.FUND FOR OFFICE DEPOT | |
| 12/31/2008 | $88.00 | FASTSIGNS | RED ON WHITE ALUM. SIGNS | |
| 1/12/2009 | $177.00 | FASTSIGNS | SIGNS - PLEASE AVOID TOWNE DR.... | |
| 12/1/2008 | $36.00 | GREAT VALLEY LOCKSHOP | KEYS FOR CONTRACTOR | |
| 12/8/2008 | $160.80 | GREAT VALLEY LOCKSHOP | PADLOCKS, REKEY CYLINDERS & KEYS | |
| 12/29/2008 | $474.82 | HANSON AGGREGATES INC | 36.95 TONS SUBBASE AGGREGATE | |
| 12/31/2008 | $908.00 | HANSON AGGREGATES INC | 70.66 TONS SUBGRADE 2 AGGREGATE | |
| 12/15/2008 | $2,089.39 | LENNI ELECTRIC CORPORAT | TEMP SERV. FOR TRAILER - RIDLEY CRK | |
| 12/31/2008 | $120.00 | LENNI ELECTRIC CORPORAT | SEWER PLANT - GUY WIRE RELOCATE | |
| 12/29/2008 | $7,865.00 | MACANGA INC. | TRUCK & TRACKHOE RENTAL 12/5-12/18 | |
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
4 of 8
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 12/1/2008 | $2,466.00 | PATTERSON, MICHAEL J. | MATERIALS & LABOR - SPLIT RAIL FENCE | |
| 12/1/2008 | $4,907.72 | PIPE XPRESS INC. | COPPER TUBING, BRASS COMP. COUPLING | |
| 12/15/2008 | $813.74 | PIPE XPRESS INC. | BURIAL HYDRANT, BRASS CURB STOP, & | |
| 12/29/2008 | $129.00 | RAM-T CORPORATION | 2 FT. SILT FENCE | |
| 12/1/2008 | $1,183.00 | RANSOME RENTAL COMPAN | CATERPILLAR - TRUCK LOADER RENTAL | |
| 12/8/2008 | $3,960.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 11/13-11/25/08 | |
| 12/29/2008 | $908.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15 - 12/18/08 | |
| 12/31/2008 | $1,044.85 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15-12/16/08 | |
| 12/8/2008 | $119.95 | SAFETY SOLUTIONS INC. | MEDICAL SUPPLIES | |
| 12/1/2008 | $635.60 | US MUNICIPAL SUPPLY INC. | CUSTOM SIGNS - RIDLEY CREEK TREATMT | |
| 12/31/2008 | $157.50 | GAWTHROP GREENWOOD | LEGAL | |
| 1/31/2009 | $936.50 | GAWTHROP GREENWOOD | LEGAL | |
| 3/19/2009 | $1,246.64 | HAMMOND & MCCMLOSY | WATER SERVICE | |
| 3/31/2009 | $1,254.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/2/2009 | $274.21 | PIPE XPRESS INC. | YARD HYDRANT #2 | |
| 4/2/2009 | $1,910.28 | HAMMOND & MCCMLOSY | WATER PIPING | |
| 5/11/2009 | $158.69 | US MUNICIPAL SUPPLY INC. | 3 SIGNS | |
| 4/30/2009 | $264.86 | LENNI ELECTRIC CORPORAT | WIRED HOT WATER HEATER | |
| 5/31/2009 | $133.00 | GAWTHROP GREENWOOD | LEGAL | |
| 6/30/2009 | $304.00 | GAWTHROP GREENWOOD | LEGAL | |
| 7/17/2009 | $1,481.00 | EAST GOSHEN TOWNSHIP | BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE) | |
| 9/10/2009 | $254.85 | AGWAY | TREE STAKES AND PEAT MOSS | |
| 8/25/2009 | $1,855.00 | HARMONY HILL NURSERIES | 16 TREES | |
| 8/31/2009 | $836.00 | GAWTHROP GREENWOOD | 2 MONTH LEGAL | |
| 11/19/2009 | $314.00 | VIMCO | SEALER FOR FLOORS | |
| 10/31/2009 | $285.00 | GAWTHROP GREENWOOD | LEGAL | |
| 12/31/2010 | $1,414.97 | L/B water | YARD HYDRANT #2 | |
| 12/18/2009 | $443.48 | Grainger | Hose Reel 1 inch | |
| 12/18/2009 | $267.98 | Grainger | Hose Reel 3/4 inch | |
| 2/2/2010 | $789.45 | Fisher Scientific | Lab Equipment | |
| 2/28/2010 | $57.00 | GAWTHROP GREENWOOD | LEGAL | |
| 3/15/2010 | $103.96 | Matthews Ford | Van rental | |
| 3/31/2010 | $275.50 | Grainger | Hose | |
| 3/31/2010 | $247.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/7/2010 | $70.15 | GREAT VALLEY LOCKSHOP | 6 locks | |
| 4/14/2010 | $641.98 | Grainger | Shelving | |
| 4/15/2010 | $1,127.48 | Continetal Fire & Safety | 3" & 1.75" Hose | |
| 4/16/2010 | $28.58 | Grainger | Phone | |
| 3/17/2010 | $1,092.01 | Water Pollution Biology | Michael Geradi - Talk | |
| 2/22/2010 | $1,104.50 | McNichols | Safety Grating | |
| 5/5/2010 | HAMMOND & MCCMLOSY | WATER LINE OFFICE | ||
| 5/5/2010 | HAMMOND & MCCMLOSY | Hose fitting in storage room | ||
| 4/26/2010 | Fisher Scientific | BALANCE | ||
| 4/29/2010 | Fisher Scientific | COD HEATING BLOCK | ||
| 5/3/2010 | Fisher Scientific | DESICCATOR & OVEN | ||
| 5/12/2010 | Fisher Scientific | FURNACE |
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
5 of 8
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 4/19/2010 | Grainger | pump and hose | ||
| 5/21/2010 | USA Blue book | beakers | ||
| 4/29/2010 | Marco | 3 10Lb dry Chem FX | ||
| 4/26/2010 | Cleaners Pro shop | cleaniong equiipment | ||
| 5/9/2010 | Staples | offcie equipment | ||
| 4/30/2010 | GAWTHROP GREENWOOD | Legal | ||
| Total | $47,461.42 | $47,461.42 | ||
| Extras - Capital - Identified capital extras that have not been paid | ||||
| $20,396.00 | Driveway Restoration | |||
| $3,300.00 | Restoration of parking area | |||
| $50,000.00 | Paving at RCSTP (we received a credit from Worth) | |||
| Total | $73,696.00 | $73,696.00 | ||
| Trailer, Phone, Porta Potty & Internet | ||||
| 12/15/2008 | $1,039.10 | ACTON MOBILE INDUSTRIES | RENTAL MOBILE OFFICE | |
| 12/22/2008 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - THRU 1/19/09 | |
| 1/21/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 1/20-2/20/09 | |
| 2/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 2/20- 3/20/09 | |
| 3/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 3/20 - 4/19 | |
| 4/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 4/20 - 5/19 | |
| 5/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 5-20 - 6/19 | |
| 6/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 6/20 - 7/19 | |
| 7/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 7/20 to 8/19 | |
| 8/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 8/20/to | |
| 9/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | ||
| 10/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 11/19 | |
| 11/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 12/19 | |
| 12/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 1/19 | |
| 1/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 2/19/10 | |
| 2/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 3/19/10 | |
| 3/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 4/19 | |
| 4/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 5/19 | |
| 5/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 6/19 | |
| $5,342.90 | $5,342.90 | |||
| 12/15/2008 | $140.00 | POTTY QUEEN | RENTAL PORTABLE TOILET - RIDLEY CRK | |
| 12/22/2008 | $64.47 | POTTY QUEEN | RENTAL TOILET 12/23-1/10/08 | |
| 2/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 2/8-3/7 | |
| 3/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 3/8-4/4 | |
| 4/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 4/5-5/2 | |
| 5/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET ???? | |
| 7/26/2009 | $95.00 | POTTY QUEEN | RENTAL 7/26 TO 8/22 | |
| 8/23/2009 | $95.00 | POTTY QUEEN | Rental 8/23 to 9/19 | |
| 9/20/2009 | $95.00 | POTTY QUEEN | RENTAL 9/20 to 10/17 | |
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
6 of 8
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 10/18/2009 | $95.00 | POTTY QUEEN | 10/18/09 to 11/14/09 | |
| 11/14/2009 | $95.00 | POTTY QUEEN | 11/15 to 12/13 | |
| 12/13/2009 | $95.00 | POTTY QUEEN | 12/13 to 1/9/10 | |
| 1/10/2010 | $95.00 | POTTY QUEEN | 1/10/10 to 2/6/10 | |
| 2/7/2010 | $95.00 | POTTY QUEEN | 2/7/10 to 3/6/10 | |
| 3/7/2010 | $95.00 | POTTY QUEEN | 3/7 to 4/3 | |
| 4/4/2010 | $95.00 | POTTY QUEEN | 4/4 to 5/1 | |
| 5/2/2010 | $98.80 | POTTY QUEEN | 5/2 to 5/29 | |
| 5/30/2010 | $96.90 | POTTY QUEEN | 5/30 to 6/26 | |
| $1,730.17 | $1,730.17 | |||
| 12/22/2008 | $174.65 | VERIZON -7041 | NOVEMBER 25 - DECEMBER 6, 2008 | |
| 1/7/2009 | $137.87 | VERIZON -7041 | BILLING DATE 1/07/09 | |
| 2/7/2009 | $130.34 | VERIZON -7041 | BILLING DATE 2/07/09 | |
| 3/7/2009 | $133.97 | VERIZON -7041 | BILLING DATE 3/7/09 | |
| 4/7/2009 | $136.00 | VERIZON -7041 | BILLING DATE 4/7/09 | |
| 5/7/2009 | $137.66 | VERIZON -7041 | BILLING DATE 5/7/09 | |
| 6/7/2009 | $178.47 | VERIZON -7041 | BILLINGDATE 6/7/2009 | |
| 7/7/2009 | $145.21 | VERIZON -7041 | Billing Date 7/7/09 | |
| 8/7/2009 | $134.44 | VERIZON -7041 | Billing Date 8/7/09 | |
| 9/7/2009 | $132.93 | VERIZON -7041 | billing date 9/7/09 | |
| 10/7/2009 | $133.43 | VERIZON -7041 | Billing date 10/7/09 | |
| 11/7/2009 | $133.79 | VERIZON -7041 | Billing Date 11/7/09 | |
| 12/7/2009 | $136.76 | VERIZON -7041 | Billing date 12/7/09 | |
| 1/7/2010 | $135.11 | VERIZON -7041 | Billing date 1/7/10 | |
| 2/7/2010 | $134.35 | VERIZON -7041 | Billing date 2/7/10 | |
| 3/7/2010 | $134.34 | VERIZON -7041 | Billing date 3/7/10 | |
| 4/7/2010 | $134.72 | VERIZON -7041 | Billing date 4/7/10 | |
| 5/7/2010 | $136.37 | VERIZON -7041 | billing ddate 5/7/2010 | |
| $2,520.41 | $2,520.41 | |||
| 8/31/2009 | $286.56 | VERIZON | INTERNET (FIRST BILL) | |
| 9/28/2009 | $69.99 | VERIZON | INTERNET | |
| 10/28/2009 | $69.99 | VERIZON | INTERNET | |
| 11/28/2009 | $69.99 | VERIZON | INTERNET | |
| 12/28/2009 | $69.99 | VERIZON | INTERNET | |
| 1/28/2010 | $69.99 | VERIZON | INTERNET | |
| 2/28/2010 | $69.99 | VERIZON | INTERNET | |
| 3/28/2010 | $69.99 | VERIZON | INTERNET | |
| 4/28/2010 | $69.99 | VERIZON | INTERNET | |
| 5/28/2010 | $69.99 | VERIZON | INTERNET | |
| $916.47 | $916.47 | |||
| Trailer, Phone, Porta Potty & Internet Total | $10,509.95 |
DETAIL
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
7 of 8
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS
June 9, 2010
| Potential capital extras | ||
|---|---|---|
| Pipe conduit Conflicts | $30,000 | |
| Controls | $10,000 | |
| Sludge room retrofit | $10,000 | |
| HVAC Thermostats | $5,000 | |
| Cathode Protection | $10,000 | |
| Treatment Tanks | $50,000 | |
| Electrician (increase in wages) | $20,000 | |
| UV Channel | $11,357 | |
| Total potential extras | $146,357 | $146,357 |
| Potential Receipts | ||
| H2O Grant Money | $464,195 | |
| Total Potential Receipts | $464,195 | $464,195 |
POTENTIAL EXTRAS
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
8 of 8
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS
June 9, 2010
| NO. | AMOUNT | APPROVED | WORK | STATUS | PAID |
|---|---|---|---|---|---|
| WORTH | |||||
| 1 | $3,209.70 | 2/24/09 | BLOWER #1 REPAIR | APPROVED | NO |
| 4 | $5,542.80 | 5/11/09 | BLOWER #2 REPAIR | APPROVED | NO |
| ? | $4,617.08 | ???? | BLOWER #3 REPAIR | APPROVED | NO |
| 3 | $2,703.00 | 12/14/09 | ANTI-FLOT COLLAR | APPROVED | NO |
| 5 | $6,784.65 | 12/14/09 | LARGER MIXER FOR FLOC TANK | APPROVED | NO |
| 15 | $4,494.52 | 12/14/09 | REMOVABLE RAILS ON SBR TANK | APPROVED | NO |
| 17 | $6,126.78 | 3/8/10 | BLOWER #4 REPAIR | APPROVED | NO |
| 8 | -$6,250.00 | 3/8/10 | CREDIT FOR CAST IRON PIPE | APPROVED | NO |
| -$20,000.00 | 2/8/10 | Credit for Electric Wages | APPROVED | NO | |
| 9 | -$50,000.00 | 2/8/10 | Credit for paving | APPROVED | NO |
| 19 | $27,702.20 | 5/20/10 | air drops | APPROVED | NO |
| 20 | $3,516.77 | 5/20/10 | 2 doors | APPROVED | NO |
| 21 | $18,094.59 | 5/20/10 | walkways | APPROVED | NO |
| 22 | -$13,875.00 | 5/20/10 | Credit for concrete | APPROVED | NO |
| Total | -$7,332.91 | ||||
| CLINGER | |||||
| Denied | EXTEND 34 KV LINES | DENIED | |||
| 1 | $5,106.00 | 7/1/09 | CORNER UNIT FOR MCC | APPROVED | NO |
| 2 | $23,585.00 | SERVICE DISCONNECT | APPROVED | NO | |
| 3 | $3,171.00 | 4/12/10 | Applebrook Pump | APPROVED | NO |
| Total | $31,862.00 | ||||
CHANGE ORDERS
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls
3. RIDLEY CREEK INV
25509
COPY
HAMMOND & MC CLOSKEY, INC.
PLUMBING & HEATING
1 CANNON HILL DRIVE
WEST CHESTER, PA 19382
Phone #: 610-793-0411
Invoice
| Date | Invoice # |
|---|---|
| 5/5/2010 | 4513 |
APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: 0742-7452
Billing Address:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Relocate water Line
Job Address:
East Goshen Township
Ridley Creek Sewer Treatment Plant
West Chester, PA 19380
| Telephone #: | P.O. No. | Terms: |
|---|---|---|
| 610-692-7171 | Due on receipt |
| Description | Amount |
|---|---|
| 4/28/10 - Rerouted main water line in office area. Installed new hose faucet outside office door. | |
| 1 - 1" TecTite coupling | 23.87 |
| 1 - 3/4" TecTite coupling | 11.32 |
| 50' - 1" CPVC pipe | 83.50 |
| 10' - 3/4" CPVC pipe | 8.20 |
| 8 - 1" CPVC ells | 26.24 |
| 4 - 1" CPVC couplings | 11.28 |
| 1 - 1" x 3/4" CPVC tee | 4.21 |
| 6 - 2-1/8" unistrut pipe clamps | 137.88 |
| 1 - 1" CxC ball valve | 19.60 |
| 1 - 3/4" CxC ball valve | 12.05 |
| 1 - 3/4" CxF drop ear ell | 14.79 |
| 1 - 3/4" hose bibb | 12.90 |
| 2 - 3/4" CxC ells 45 degrees | 15.40 |
| 1" CxC 90 degree ell | 13.30 |
| 30' - 1-1/8" pipe insulation | 59.40 |
| 10' - 3/4" type-L copper tubing | 48.60 |
| 2 - 3/4" CxC ells 90 degrees | 10.84 |
| misc. shop supplies (glue, anchors, solder, etc) | 15.00 |
| 5.5 HRS. @ $100 HR. | 550.00 |
| Total | $1,078.38 |
Thank you! We appreciate the opportunity to serve you and the confidence you have placed in us.
TERMS: NET DUE UPON RECEIPT; $25 charge for checks returned NSF; $20 charge to transfer accounts to Transworld Systems for collection.
25509
COPY
HAMMOND & MC CLOSKEY, INC.
PLUMBING & HEATING
1 CANNON HILL DRIVE
WEST CHESTER, PA 19382
Phone #: 610-793-0411
Invoice
| Date | Invoice # |
|---|---|
| 5/5/2010 | 4523 |
APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: 0742-7452
Billing Address:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Press RM
Job Address:
East Goshen Township
Ridley Creek Sewer Treatment Plant
West Chester, PA 19380
| Telephone #: | P.O. No. | Terms: |
|---|---|---|
| 610-692-7171 | Due on receipt |
| Description | Amount |
|---|---|
| 5/5/10 - Installed hose fitting in storage room. Ran hose to sludge room and tied into PVC water line for press. | |
| 2 HRS. @ $100 HR. | 200.00 |
| 1 - 3/4" hose faucet | 11.30 |
| 1 - 3/4" x 1/2" x 1/2" brass tee | 9.90 |
| 1 - 1/2" brass nipple | 11.10 |
| 1 - 1" PVC S/40 tee | 2.10 |
| 1 - 1" PVC S/40 "M" adapter | 1.97 |
| 1 - 1" x 3/4" brass reducing coupling | 14.10 |
| 1 - 1/2" x 3/4" CxM adapter | 8.14 |
| 1' - 1/2" type "L" copper tubing | 3.10 |
| 2 - S/S gear clamps | 4.90 |
| 1 - 4' clothes washer hose | 3.49 |
| Total | $270.10 |
We appreciate your business and look forward to serving you again.
TERMS: NET DUE UPON RECEIPT; $25 charge for checks returned NSF; $20 charge to transfer accounts to Transworld Systems for collection.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 440011
Invoice Date : 05/25/2010
Project : EGMA0707
Project Name : RCSTP Expansion
For Services Rendered through: 05/16/2010
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting control problems with UV system, effluent weir plate, and SBR #3 overload; responses to Contractor RFIs; schedule reviews; and review/negotiations of change orders with Township and contractors.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Permit Design | est. $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. $121,700.00 | $91,817.98 | $111,105.48 | $19,287.50 | |
| Total : | $644,700.00 | $614,683.78 | $633,971.28 | $19,287.50 |
Amount Due This Invoice $19,287.50
ok RS
6-2-10
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary
Invoice Date 05-25-2010
| Project: | RCSTP Expansion and Upgrade | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA0707 | ||
| Invoice No: | 440011 | ||
| Invoice Period: | 4/19/2010 | to | 5/16/2010 |
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Contract Amount: | $ 644,700.00 | ||
| Previously Invoiced: | $ 614,683.78 | ||
| Current Invoice: | $ 19,287.50 | ||
| Invoiced to Date ($): | $ 633,971.28 | ||
| Invoiced to Date (%): | 98% | ||
| Remaining Budget ($): | $ 10,728.72 | ||
| Remaining Budget (%): | 2% |
Budget by Phase:
| Phase No. | 05 | 06 | 10 |
|---|---|---|---|
| Phase Name: | Construction | Additional Engineering | Continued Eng Svcs |
| Phase Budget: | $ 88,200.00 | $ 10,000.00 | $ 99,700.00 |
| Changes: | $ 48,000.00 | $ 10,000.00 | $ 22,000.00 |
| Contract Amount: | $ 136,200.00 | $ 20,000.00 | $ 121,700.00 |
| Previously Invoiced: | $ 136,197.62 | $ 16,469.18 | $ 91,817.98 |
| Current Invoice: | $ - | $ 3,528.00 | $ 19,287.50 |
| Invoiced to Date ($): | $ 136,197.62 | $ 19,997.18 | $ 111,105.48 |
| Invoiced to Date (%): | 100% | 100% | 91% |
| Remaining Budget ($): | $ 2.38 | $ 2.82 | $ 10,594.52 |
| Remaining Budget (%): | 0% | 0% | 11% |
Comments: Phase 10 - Continued Engineering Services
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; and site observation of construction. Consultation with Township regarding same.
Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting problems with UV system, effluent weir plate and SBR #3 overload; responses to Contractor RFIs; schedule reviews; tracking pressure test failure; and review/negotiations of change orders with Township and contractors.
Invoiced effort does not include effort related to responding to the Electrical Contractor's letter of 3/15/2010.
East Goshen Municipal Authority
EGMA0707 Invoice Summary
Invoice Date 05-25-2010
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 72.75 | 23.00 | 95.75 |
| Senior Engineer | 259.50 | 25.00 | 284.50 |
| Senior Designer | 98.00 | 30.00 | 128.00 |
| Project Engineer | 49.00 | 35.00 | 84.00 |
| Associate Engineer | 7.00 | 0.00 | 7.00 |
| Graduate Engineer | 43.00 | 0.00 | 43.00 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 541.00 | 115.50 | 656.50 |
| Engineering Technician I | 13.50 | 0.00 | 13.50 |
| Administrative Assistant I | 0.50 | 0.00 | 0.50 |
| Totals | 862.75 | 228.50 | 1315.25 |
Budget/Schedule Status (November to June):
Schedule % = 88%
Budget % = 91%
Fisher Scientific
Part of Thermo Fisher Scientific
REMIT TO: ACCT# 026655-001 P.O. BOX 3648 BOSTON MA 02241-3648
INQUIRE AT: (800) 766-7000 4500 TURNBERRY DRIVE HANOVER PARK IL 60133
D-U-N-S-00-432-1519 FEIN 23-2942737 ORIGINAL INVOICE
PLEASE REFER TO THIS INVOICE NUMBER ON YOUR REMITTANCE: 3461600
COPY
| CUSTOMER PURCHASE ORDER NUMBER - RELEASE NUMBER | INV. DATE | ORDER NO. | ACCOUNT NO. | CSO | F.O.B. | ORDER ENTRY DATE | PAGE | DUPLICATE |
|---|---|---|---|---|---|---|---|---|
| RIDLEY CREEK SEWAGE TREATMENT PLANT | 05/03/2010 | H01161270 | 026655-001 | CHI | SHIPPING POINT | 04/26/2010 | 1 |
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
SHIP TO: MARK MILLER EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
INVOICE TYPE: NOR FON CON
THIS IS A PARTIAL [X] SHIPMENT
DUE: 06/02/2010 TERMS: NET 30 DAYS FROM INVOICE DATE. PAYABLE IN U.S. CURRENCY.
APPROVED BY: [illegible] DATE PAID: CHECK #: CHARGED TO: 07424-7452
Visit: www.fishersci.com
| DESCRIPTION | CATALOG NUMBER | QUANTITY SHIPPED | UNIT PRICE | AMOUNT |
|---|---|---|---|---|
| CALLER-MARK MILLER PHONE-610-692-7171 | ||||
| SHIPMENT NBR: 003 FROM: MWD ON: | 05/03/2010 | |||
| DESICCATOR PASOLINA W/O HANDLE | 08 647 44 | 1 EA | 366.29 | 366.29 |
| SHIPMENT NBR: 004 FROM: VND ON: | 05/01/2010 | |||
| PRECISION PRE MECH OV 2.5 120V | 11 475 138 | 1 EA | 1,883.90 | 1,883.90 |
| MERCHANDISE SUBTOTAL | 2,250.19 | |||
| SHIPPING | 8.34 | |||
| DIRECT SHIPMENT CHARGE | 70.64 | |||
| TOTAL INVOICE AMOUNT | 2,329.17 |
FOR YOUR PROTECTION, OUR COMPANY DOES NOT ACCEPT CREDIT CARD NUMBERS VIA FAX OR EMAIL
TELL US ABOUT YOUR RECENT CUSTOMER SERVICE EXPERIENCE BY COMPLETING A SHORT SURVEY. THIS SHOULD TAKE NO LONGER THAN THREE MINUTES. ENTER THE LINK INTO YOUR INTO YOUR BROWSER AND ENTER THE PASSCODE SHOWN. http://survey.medallia.com/fishersci PASSCODE: USA-PGH-CS1
PLEASE USE REMIT TO ADDRESS ABOVE AND INCLUDE DEPT. NBR.
See reverse side for complete terms and conditions or visit http://www.fishersci.com/wps/portal/CMSTATIC?href=Footer/tandcsale.jsp
PAST DUE BALANCES ARE SUBJECT TO A FINANCE CHARGE. THIS SHIPMENT WAS DELIVERED IN PERFECT CONDITION AND SIGNED FOR BY THE TRANSPORTATION COMPANY. CONSIGNORS RESPONSIBILITY CEASES UPON DELIVERY OF GOODS TO CARRIER. DO NOT ACCEPT SHIPMENT SHOWING EVIDENCE OF DAMAGE OR SHORTAGE UNTIL AGENT OF CARRIER ENDORSES NOTATION TO THIS EFFECT ON FACE OF TRANSPORTATION RECEIPT. WITHOUT THIS DOCUMENTARY EVIDENCE CLAIM CANNOT BE FILED. SELLER CERTIFIES THAT ALL GOODS (OR SERVICES) COVERED BY THIS INVOICE WERE PRODUCED IN COMPLIANCE WITH ALL APPLICABLE REQUIREMENTS OF SECTIONS 6, 7, AND 12 OF THE FAIR LABOR STANDARDS ACTS OF 1938, AS AMENDED, AND OF THE REGULATIONS AND ORDERS OF THE UNITED STATES DEPARTMENT OF LABOR ISSUED UNDER SECTION 14 THEREOF. NO CREDIT WILL BE ALLOWED FOR MERCHANDISE RETURNED WITHOUT PRIOR AUTHORIZATION.
THE PRICES SHOWN ON THIS INVOICE ARE NET OF DISCOUNTS PROVIDED AT THE TIME OF PURCHASE. SOME PRODUCTS MAY BE SUBJECT TO ADDITIONAL DISCOUNTS AGREED UPON BETWEEN THE PARTIES.
Fisher Scientific
Part of Thermo Fisher Scientific
REMIT TO: ACCT# 026655-001 P.O. BOX 3648 BOSTON MA 02241-3648
INQUIRE AT: (800) 766-7000 4500 TURNBERRY DRIVE HANOVER PARK IL 60133
D-U-N-S-00-432-1519 FEIN 23-2942737 ORIGINAL INVOICE
PLEASE REFER TO THIS INVOICE NUMBER ON YOUR REMITTANCE: 3781979
COPY
| CUSTOMER PURCHASE ORDER NUMBER - RELEASE NUMBER | INV. DATE | ORDER NO. | ACCOUNT NO. | CSO | F.O.B. | ORDER ENTRY DATE | PAGE | DUPLICATE |
|---|---|---|---|---|---|---|---|---|
| RIDLEY CREEK SEWAGE TREATMENT PLANT | 05/12/2010 | H01161270 | 026655-001 | CHI | SHIPPING POINT | 04/26/2010 | 1 |
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
RECEIVED BY: MAY 17 2010
SHIP TO: MARK MILLER EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
INVOICE TYPE: NOR FON CON
THIS IS A PARTIAL [ ] SHIPMENT
DUE: 06/11/2010 TERMS: NET 30 DAYS FROM INVOICE DATE. PAYABLE IN U.S. CURRENCY.
Visit: www.fishersci.com
| DESCRIPTION | CATALOG NUMBER | QUANTITY SHIPPED | UNIT PRICE | AMOUNT |
|---|---|---|---|---|
| CALLER-MARK MILLER PHONE-610-692-7171 | ||||
| SHIPMENT NBR: 005 FROM: VND ON: | 05/11/2010 | |||
| BT MUFFLE FURN MAN 120V50/60HZ | 10 554 5 | 1 EA | 1,401.54 | 1,401.54 |
| MERCHANDISE SUBTOTAL | 1,401.54 | |||
| DIRECT SHIPMENT CHARGE | 84.09 | |||
| TOTAL INVOICE AMOUNT | 1,485.63 |
FOR YOUR PROTECTION, OUR COMPANY DOES NOT ACCEPT CREDIT CARD NUMBERS VIA FAX OR EMAIL
TELL US ABOUT YOUR RECENT CUSTOMER SERVICE EXPERIENCE BY COMPLETING A SHORT SURVEY. THIS SHOULD TAKE NO LONGER THAN THREE MINUTES. ENTER THE LINK INTO YOUR INTO YOUR BROWSER AND ENTER THE PASSCODE SHOWN. http://survey.medallia.com/fishersci PASSCODE: USA-PGH-CS1
PLEASE USE REMIT TO ADDRESS ABOVE AND INCLUDE DEPT. NBR.
APPROVED BY: [illegible] DATE PAID: CHECK #: CHARGED TO: 07424-7452 Lab Equip.
See reverse side for complete terms and conditions or visit http://www.fishersci.com/wps/portal/CMSTATIC?href=Footer/tandcsale.jsp
PAST DUE BALANCES ARE SUBJECT TO A FINANCE CHARGE. THIS SHIPMENT WAS DELIVERED IN PERFECT CONDITION AND SIGNED FOR BY THE TRANSPORTATION COMPANY. CONSIGNORS RESPONSIBILITY CEASES UPON DELIVERY OF GOODS TO CARRIER. DO NOT ACCEPT SHIPMENT SHOWING EVIDENCE OF DAMAGE OR SHORTAGE UNTIL AGENT OF CARRIER ENDORSES NOTATION TO THIS EFFECT ON FACE OF TRANSPORTATION RECEIPT. WITHOUT THIS DOCUMENTARY EVIDENCE CLAIM CANNOT BE FILED. SELLER CERTIFIES THAT ALL GOODS (OR SERVICES) COVERED BY THIS INVOICE WERE PRODUCED IN COMPLIANCE WITH ALL APPLICABLE REQUIREMENTS OF SECTIONS 6, 7, AND 12 OF THE FAIR LABOR STANDARDS ACTS OF 1938, AS AMENDED, AND OF THE REGULATIONS AND ORDERS OF THE UNITED STATES DEPARTMENT OF LABOR ISSUED UNDER SECTION 14 THEREOF. NO CREDIT WILL BE ALLOWED FOR MERCHANDISE RETURNED WITHOUT PRIOR AUTHORIZATION.
THE PRICES SHOWN ON THIS INVOICE ARE NET OF DISCOUNTS PROVIDED AT THE TIME OF PURCHASE. SOME PRODUCTS MAY BE SUBJECT TO ADDITIONAL DISCOUNTS AGREED UPON BETWEEN THE PARTIES.
Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205
Invoice
Number: 117366
Date: 28-May-2010
P.O. Number:
Job Description: 2-tank cleanings
Order Num: 161112
Serviced: 15-May-2010
BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
JOB SITE:
Ridley Creek STP
Town Drive & Line Road
West Chester, PA
| Quantity | ServiceType | Amount | Tax | Warranty & Expiration | Extension |
|---|---|---|---|---|---|
| 1 | Disposal Charges TOTAL OF 54 TONS OF GRIT @ 96.00 A TON-SEE ATTACHED BREAKDOWN |
$5,184.00 | No | 0 Days | $5,184.00 |
| 1 | Disposal Charges TOTAL OF 153,100 GALLONS OF SLUDGE @ .227 A GALLON-SEE ATTACHED BREAKDOWN |
$34,753.70 | No | 0 Days | $34,753.70 |
| Taxable Amount: $0.00 | Tax Rate: 0 | Tax: $0.00 | Description: PA Tax Exempt | Subtotal NonTaxed: $39,937.70 Subtotal Taxable: $0.00 Subtotal Tax: $0.00 |
|---|---|---|---|---|
| Payment Terms: Net 30 | Payment: $0.00 | Adjustment: $0.00 | Late Charge: $0.00 | Please Pay: $39,937.70 |
PA State Homeowner Protection Act, Registration #PA022859
A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-7452
Please detach here and return the bottom portion with your payment.
From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| Order No. | Invoice No. | Date | Amount Due |
|---|---|---|---|
| 161112 | 117366 | 28-May-2010 | $39,937.70 |
| Serviced 15-May-2010 | |||
To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
[Handwritten note: ok to pay Mark/SMA 6/9/2010]
USABlueBook
INVOICE
Remit to: P.O. Box 9004 Gurnee, IL 60031-9004
TEL: (847) 689-9781 FAX: (847) 689-3001 TOLL FREE: 1-800-548-1234 F.E.I.N.: 52-2418852
2010 MAY 28 AM 11 03
| INVOICE NO. | PAGE NO. | CUSTOMER NO. | DATE |
|---|---|---|---|
| 155755 | 1 of 1 | 796821 | 05/21/10 |
BILL TO: 796821 EAST GOSHEN TOWNSHIP PW DEPT 1580 PAOLI PIKE WEST CHESTER PA 19380 USA ATTN MARK MILLER
SHIP TO: SAME EAST GOSHEN TOWNSHIP PW DEPT 1580 PAOLI PIKE WEST CHESTER PA 19380 USA
RC
APPROVED BY: [illegible] DATE PAID: CHECK #: CHARGED TO: 07424-7452
| CUSTOMER P.O. NO. | SHIP DATE | SLP | TERMS | TAX CODE | SALES ORDER NO. | W/H | FREIGHT | SHIP VIA |
|---|---|---|---|---|---|---|---|---|
| PER MARK | 05/21/10 | CHH | NET 30 | PAEXEMPT | 795306 | 01 | PREPAID | UPS |
| USA STOCK NO. | DESCRIPTION | ORDERED | SHIPPED | BACK ORDER | U/M | PRICE | PER | EXTENSION |
|---|---|---|---|---|---|---|---|---|
| 34860 | Griffin Low Form Beaker 1000ml Polypropylene, Nalgene PK/3 | 4 | 4 | 0 | PK | 34.15 | PK | 136.60 |
| 41332 | Nalgene Settleometer, Jar & Lid Only - No Accessories | 3 | 3 | 0 | EA | 99.95 | EA | 299.85 |
APPROVED BY: DATE PAID: CHECK #: CHARGED TO:
THANK YOU for your business! 1.5% MONTHLY FINANCE CHARGE ON AMOUNTS 30 DAYS PAST DUE Discounts Apply to Merchandise Only
| MERCHANDISE | MISCELLANEOUS | DISCOUNT | TAX | FREIGHT | TOTAL |
|---|---|---|---|---|---|
| 436.45 | .00 | .00 | .00 | 20.36 | 456.81 |
Should it become necessary to refer your unpaid balance to a collection agency, a collection fee, not to exceed 25% of the balance referred; plus reasonable attorney's fees; and court costs when necessary, will be added to the balance due.
Please Detach and Return Bottom Portion to Insure Proper Credit to Your Account
****IMPORTANT**** Please include this customer # on the face of your remittance check.
| CUSTOMER NO. | INVOICE NO. | DATE | TOTAL |
|---|---|---|---|
| 796821 | 155755 | 05/21/10 | 456.81 |
USABlueBook REMIT TO: USABlueBook, P.O. Box 9004, Gurnee, IL 60031-9004
[Handwritten top: MA]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
05/31/2010
Client No: 6604-01M
Invoice No. 79963
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 05/10/2010 RFA |
Review packet for 5/10/10 meeting of Authority; attend regular meeting of Authority. | 3.50 | |
| For Current Services Rendered | 3.50 | 665.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 3.50 | $190.00 | $665.00 |
| Previous Balance | $627.00 |
|---|---|
| Total Current Charges | 665.00 |
| 05/19/2010 Fee Payment | -627.00 |
| Balance Due | $665.00 |
[Handwritten note next to Balance Due: 6/9/10 ok RS with circle around $665.00]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
05/31/2010
Client No: 6604-06M
Invoice No. 79964
Ridley Creek Treatment Plant Upgrades/ Expansion
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 05/12/2010 RFA |
Review RCSTP contract regarding percentage payment issue and releases of liens; telephone conference with Rick Smith regarding contract provisions regarding payment to contractor. | 1.00 | |
| 05/13/2010 RFA |
Review messages from Rick Smith regarding need for special meeting of Authority. | 0.30 | |
| 05/14/2010 RFA |
Review message from Evan Andrews regarding special meeting of Authority; review message from Rick Smith regarding special meeting. | 0.60 | |
| 05/17/2010 RFA |
Review letter from L. Smith to Clinger of 5/11/10. | 0.30 | |
| 05/19/2010 RFA |
Review agenda for special meeting of Authority 5/20/10; telephone conference with Rick Smith regarding special meeting of Municipal Authority. | 0.70 | |
| 05/20/2010 RFA |
Attend special meeting of Municipal Authority to act on Worth invoice and change orders. | 1.20 | |
| 05/21/2010 RFA |
Review message from Mark Miller regarding Ridley Creek STP sludge room walls. | 0.30 | |
| For Current Services Rendered | 4.40 | 836.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 4.40 | $190.00 | $836.00 |
East Goshen Municipal Authority
Ridley Creek Treatment Plant Upgrades/ Expansion
Page: 2
05/31/2010
Client No: 6604-06M
Invoice No. 79964
| Previous Balance | $1,330.00 |
|---|---|
| Total Current Charges | 836.00 |
| 05/19/2010 Fee Payment | -304.00 |
| Balance Due | $1,862.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
MARCO
MARCO INCORPORATED
320 Commerce Drive - Exton, PA. 19341
Phone 610/363-2233 Fax 610/363-2886
FIRE SUPPRESSION SPECIALISTS
THANK YOU
WE APPRECIATE YOUR BUSINESS
IF YOU HAVE A PROBLEM PLEASE CALL US AT 610/363-2233
SC Invoice
| Invoice No. | 064873 |
|---|---|
| Date | 04/29/2010 |
| Order No. | SC00062840 |
| Contract No | |
| Cust ID | EAST1580 |
| Page | 1 of 1 |
BILL TO:
EAST GOSHEN TOWNSHIP
MARK S MILLER
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SHIP TO:
EAST GOSHEN TOWNSHIP
MARK S MILLER
1580 PAOLI PIKE
WEST CHESTER, PA 19380 Ph (610) 692-8950
| F.O.B. POINT | SHIP VIA | TERMS | CUSTOMER P.O. NO. | ORDERED BY | SALES PER |
|---|---|---|---|---|---|
| Net 15 Days | - | MARK S MILLER | 0904 |
| ITEM NUMBER AND DESCRIPTION | QTY SHIP | UNITS | PRICE | EXT. PRICE |
|---|---|---|---|---|
| 111MPX010131 10 LB. MP DRY CHEM PORT FX 4A:80B:C (ABC10-W STRIKE FIRST) |
3.00 | EACH | 86.00 | 258.00 |
APPROVED BY: ____________
DATE PAID: ____________
CHECK #: ____________
CHARGED TO: 07424.7452
[Watermark: COPY]
1972 - 2010
38 YEARS OF EXCELLENCE
Contractor License Information
PA PA014526
Phila. 20674
DE FSL0111
MD MSC-184
NJ P00032
VA 2705-101354A
Please Remit To:
Marco Incorporated - 320 Comerce Drive Exton, Pa. 19341
| Sales Total | SalesTax | TOTAL |
|---|---|---|
| 258.00 | .00 | 258.00 |
OUR FEDERAL ID NUMBER IS 23-1908247
A Service Charge of 1.5% ($ 1.00 min) per Month Will be Added to all Past Due Accounts.
To insure your account is credited Please put the invoice number on Your Check.
PLEASE PAY THIS INVOICE NO STATEMENT WILL BE SENT.
Service Call Invoice New SD640
Page 1
Application and Certificate For Payment
| To Owner | Project | Application Info |
|---|---|---|
| East Goshen Municipal Authorit 1580 Paoli Pike West Chester, PA 19380 | Ridley Creek WWTP 1751 Towne Road Fred Papiernik 267-278-6108 West Chester, PA 19380 | Application No: 18 Date: 05/31/2010 Period To: 05/31/10 |
| From (Contractor): Worth and Company, Inc. 6263 Kellers Church Road Pipersville, PA 18947 Phone: 267 362-1100 | Contractor Job Number: P28001 Via (Architect): Contract For: | Architect's Project No: Contract Date: 10/22/08 |
Contractor's Application For Payment
| Change Order Summary | Number | Date Approved | Additions | Deductions |
|---|---|---|---|---|
| Change orders approved in previous months by owner | ||||
| Change orders approved this month | CO-001 | 05/31/10 | -42,648.25 | |
| CO-002 | 05/31/10 | 11,234.03 | ||
| CO-003 | 05/31/10 | 35,438.56 | ||
| Totals | 46,672.59 | -42,648.25 | ||
| Net change by change orders | 4,024.34 |
| Item | Amount |
|---|---|
| Original contract sum | 7,865,400.00 |
| Net change by change orders | 4,024.34 |
| Contract sum to date | 7,869,424.34 |
| Total completed and stored to date | 6,751,539.34 |
| Retainage: 5.0% of completed work | 337,576.97 |
| Retainage: 0.0% of stored material | 0.00 |
| Total retainage | 337,576.97 |
| Total earned less retainage | 6,413,962.37 |
| Less previous certificates of payment | 6,235,671.75 |
| Current payment due | 178,290.62 |
| Balance to finish, including retainage | 1,455,461.97 |
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief the work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
Contractor: By: Anne Bowman Date: 6/3/10
State of: PA County of: Bucks
Subscribed and sworn to before me this 3rd day of June 2010 (year), Notary public: Linda D Nelson
My commission expires [illegible]
COMMONWEALTH OF PENNSYLVANIA Notarial Seal Linda D. Nelson, Notary Public Plumstead Twp., Bucks County My Commission Expires Sept. 18, 2010 Member, Pennsylvania Association of Notaries
Architect's Certificate for Payment
In accordance with the Contract Documents, based on on-site observations and the data comprising the above application the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.
Amount Certified: $ 178,209.62
Architect: By: [illegible] Date: 6/10/10
This Certification is not negotiable. The Amount Certified is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.
Application and Certificate For Payment -- page 2
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18 Date: 05/31/10 Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed Previous Application | Work Completed This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| CO-001 | Blower Repairs | 3,209.70 | 0.00 | 3,209.70 | 0.00 | 3,209.70 | 100.00 | 0.00 | 160.49 | |
| CO-001A | Anit Flotation Collar | 2,703.00 | 0.00 | 2,703.00 | 0.00 | 2,703.00 | 100.00 | 0.00 | 135.15 | |
| CO-001B | Blower 2 repairs | 5,542.80 | 0.00 | 5,542.80 | 0.00 | 5,542.80 | 100.00 | 0.00 | 277.14 | |
| CO-001C | Top Entry Mixer change | 6,784.65 | 0.00 | 6,784.65 | 0.00 | 6,784.65 | 100.00 | 0.00 | 339.23 | |
| CO-001D | SBR Handrail | 4,494.52 | 0.00 | 4,494.52 | 0.00 | 4,494.52 | 100.00 | 0.00 | 224.73 | |
| CO-001E | Blower 3 Repairs | 4,617.08 | 0.00 | 4,617.08 | 0.00 | 4,617.08 | 100.00 | 0.00 | 230.85 | |
| CO-001F | Paving Credit | -50,000.00 | 0.00 | -50,000.00 | 0.00 | -50,000.00 | 100.00 | 0.00 | -2,500.00 | |
| CO-001G | SBR Wall Credit | -20,000.00 | 0.00 | -20,000.00 | 0.00 | -20,000.00 | 100.00 | 0.00 | -1,000.00 | |
| CO-002 | PVC Credit Lieu of Cast Iron | -6,250.00 | 0.00 | -6,250.00 | 0.00 | -6,250.00 | 100.00 | 0.00 | -312.50 | |
| CO-002A | Concrete Wall @ UV Channel | 11,357.25 | 0.00 | 11,357.25 | 0.00 | 11,357.25 | 100.00 | 0.00 | 567.86 | |
| CO-002B | Blower 4 Repairs | 6,126.78 | 0.00 | 6,126.78 | 0.00 | 6,126.78 | 100.00 | 0.00 | 306.34 | |
| CO-003 | (24) Air Drops | 27,702.20 | 0.00 | 27,702.20 | 0.00 | 27,702.20 | 100.00 | 0.00 | 1,385.11 | |
| CO-003A | New Doors | 3,516.77 | 0.00 | 3,516.77 | 0.00 | 3,516.77 | 100.00 | 0.00 | 175.84 | |
| CO-003B | Paint Digester Walkway | 18,094.59 | 0.00 | 18,094.59 | 0.00 | 18,094.59 | 100.00 | 0.00 | 904.73 | |
| CO-003C | Digester Concrete Credit | -13,875.00 | 0.00 | -13,875.00 | 0.00 | -13,875.00 | 100.00 | 0.00 | -693.75 | |
| Subtotal | 4,024.34 | 0.00 | 4,024.34 | 0.00 | 4,024.34 | 100.00 | 0.00 | 201.22 | ||
| G1-000 | Site Work & Yard Piping | |||||||||
| G1-001 | Bonds | 160,000.00 | 160,000.00 | 0.00 | 0.00 | 160,000.00 | 100.00 | 0.00 | 8,000.00 | |
| G1-002 | Insurance | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 2,500.00 | |
| G1-003 | Mobilization | 100,000.00 | 100,000.00 | 0.00 | 0.00 | 100,000.00 | 100.00 | 0.00 | 5,000.00 | |
| G1-004 | Pre-Planning/Schedule | 20,000.00 | 16,000.00 | 4,000.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 1,000.00 | |
| G1-005 | Submittals - Dutchland | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 | |
| G1-006 | Submittals - Jet Tech | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 | |
| G1-007 | E & S Controls | 25,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 60.00 | 10,000.00 | 750.00 | |
| G1-008 | Strip Topsoil | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 2,500.00 | |
| G1-009 | Temporary Seed | 5,000.00 | 3,000.00 | 0.00 | 0.00 | 3,000.00 | 60.00 | 2,000.00 | 150.00 |
Application and Certificate For Payment -- page 3
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18 Date: 05/31/10 Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed Previous Application | Work Completed This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G1-010 | Bioretention Basin 1 | 20,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 20,000.00 | 0.00 | |
| G1-011 | Bioretention Basin 2 | 20,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 25.00 | 15,000.00 | 250.00 | |
| G1-012 | Temporary Fence | 9,000.00 | 6,300.00 | 0.00 | 0.00 | 6,300.00 | 70.00 | 2,700.00 | 315.00 | |
| G1-013 | Influent Force Main | 85,000.00 | 85,000.00 | 0.00 | 0.00 | 85,000.00 | 100.00 | 0.00 | 4,250.00 | |
| G1-014 | Filter Feed Force Main | 85,000.00 | 85,000.00 | 0.00 | 0.00 | 85,000.00 | 100.00 | 0.00 | 4,250.00 | |
| G1-015 | Filter Effluent | 55,000.00 | 55,000.00 | 0.00 | 0.00 | 55,000.00 | 100.00 | 0.00 | 2,750.00 | |
| G1-016 | System Effluent | 55,000.00 | 55,000.00 | 0.00 | 0.00 | 55,000.00 | 100.00 | 0.00 | 2,750.00 | |
| G1-017 | Filter Feed Pump Suction | 25,000.00 | 0.00 | 22,500.00 | 0.00 | 22,500.00 | 90.00 | 2,500.00 | 1,125.00 | |
| G1-018 | Filter Feed Pump Discharge | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 1,250.00 | |
| G1-019 | Flocculation Tank to Filters | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 2,500.00 | |
| G1-020 | 4" WAS | 45,000.00 | 4,500.00 | 0.00 | 0.00 | 4,500.00 | 10.00 | 40,500.00 | 225.00 | |
| G1-021 | Yard Drain | 70,000.00 | 52,500.00 | 0.00 | 0.00 | 52,500.00 | 75.00 | 17,500.00 | 2,625.00 | |
| G1-022 | Sludge Pump Suction | 25,000.00 | 0.00 | 12,500.00 | 0.00 | 12,500.00 | 50.00 | 12,500.00 | 625.00 | |
| G1-023 | Relocate Air Lines | 20,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 20,000.00 | 0.00 | |
| G1-024 | Influent | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 2,250.00 | |
| G1-025 | Utility Water | 75,000.00 | 63,750.00 | 0.00 | 0.00 | 63,750.00 | 85.00 | 11,250.00 | 3,187.50 | |
| G1-026 | Apple Brook Discharge | 15,000.00 | 14,250.00 | 0.00 | 0.00 | 14,250.00 | 95.00 | 750.00 | 712.50 | |
| G1-027 | PVC Chemical Carrier Pipe | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 1,250.00 | |
| G1-028 | Potable Water | 45,000.00 | 38,250.00 | 6,750.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 2,250.00 | |
| G1-029 | 8" Underdrain | 40,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 75.00 | 10,000.00 | 1,500.00 | |
| G1-030 | 1" Compressed Air | 15,000.00 | 3,750.00 | 11,250.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 | |
| G1-031 | Sidewalks | 15,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 15,000.00 | 0.00 | |
| G1-032 | VOID | |||||||||
| G1-033 | VOID | |||||||||
| G1-034 | Block | 1,000.00 | 1,000.00 | 0.00 | 0.00 | 1,000.00 | 100.00 | 0.00 | 50.00 | |
| G1-035 | Chain Link Fence | 30,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 30,000.00 | 0.00 |
Application and Certificate For Payment -- page 4
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18 Date: 05/31/10 Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed Previous Application | Work Completed This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G1-036 | Demo Existing Fence | 10,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 50.00 | 5,000.00 | 250.00 | |
| Subtotal | 1,345,000.00 | 1,073,300.00 | 57,000.00 | 0.00 | 1,130,300.00 | 84.04 | 214,700.00 | 56,515.00 | ||
| G2-000 | Pump Station & Valve Vault | |||||||||
| G2-001 | Excavate Pump Station | 52,000.00 | 52,000.00 | 0.00 | 0.00 | 52,000.00 | 100.00 | 0.00 | 2,600.00 | |
| G2-002 | Install Precast Pump Station | 68,000.00 | 68,000.00 | 0.00 | 0.00 | 68,000.00 | 100.00 | 0.00 | 3,400.00 | |
| G2-003 | Install Anti-Flotation Collar | 3,500.00 | 3,500.00 | 0.00 | 0.00 | 3,500.00 | 100.00 | 0.00 | 175.00 | |
| G2-004 | Backfill Pump Station | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 600.00 | |
| G2-005 | Excavate Valve Vault | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 | |
| G2-006 | Install Valve Vault | 28,000.00 | 28,000.00 | 0.00 | 0.00 | 28,000.00 | 100.00 | 0.00 | 1,400.00 | |
| G2-007 | Backfill Valve Vault | 7,500.00 | 7,500.00 | 0.00 | 0.00 | 7,500.00 | 100.00 | 0.00 | 375.00 | |
| G2-008 | Painting | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 450.00 | |
| G2-009 | Pipe/Valves/Fittings | 15,000.00 | 14,250.00 | 750.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 | |
| G2-010 | Influent Pumps | 65,000.00 | 65,000.00 | 0.00 | 0.00 | 65,000.00 | 100.00 | 0.00 | 3,250.00 | |
| Subtotal | 275,000.00 | 274,250.00 | 750.00 | 0.00 | 275,000.00 | 100.00 | 0.00 | 13,750.00 | ||
| G3-000 | Screen Building | |||||||||
| G3-001 | Excavate Screen Bldg; Elev 13' | 38,000.00 | 38,000.00 | 0.00 | 0.00 | 38,000.00 | 100.00 | 0.00 | 1,900.00 | |
| G3-002 | Stone Underslab | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 250.00 | |
| G3-003 | Form/Pour 18" Thick Slab | 39,000.00 | 39,000.00 | 0.00 | 0.00 | 39,000.00 | 100.00 | 0.00 | 1,950.00 | |
| G3-004 | Form/Pour Exterior Walls | 65,000.00 | 65,000.00 | 0.00 | 0.00 | 65,000.00 | 100.00 | 0.00 | 3,250.00 | |
| G3-005 | Backfill | 12,000.00 | 10,800.00 | 0.00 | 0.00 | 10,800.00 | 90.00 | 1,200.00 | 540.00 | |
| G3-006 | Excavate Footers; Elev 2'8" | 7,000.00 | 7,000.00 | 0.00 | 0.00 | 7,000.00 | 100.00 | 0.00 | 350.00 | |
| G3-007 | Form/Pour Footers | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 600.00 | |
| G3-008 | Install Masonry Frost Wall | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 450.00 | |
| G3-009 | Pour Slab | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 400.00 | |
| G3-010 | Form/Pour Channel Walls | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 2,500.00 | |
| G3-011 | Install Exterior Masonry Walls | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 1,500.00 |
Application and Certificate For Payment -- page 5
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18 Date: 05/31/10 Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed Previous Application | Work Completed This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G3-012 | Structural Steel | 3,000.00 | 3,000.00 | 0.00 | 0.00 | 3,000.00 | 100.00 | 0.00 | 150.00 | |
| G3-013 | Misc Metals | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 400.00 | |
| G3-014 | Rough Carpentry | 24,000.00 | 24,000.00 | 0.00 | 0.00 | 24,000.00 | 100.00 | 0.00 | 1,200.00 | |
| G3-015 | Dryvit | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 900.00 | |
| G3-016 | FRP Grating | 4,000.00 | 4,000.00 | 0.00 | 0.00 | 4,000.00 | 100.00 | 0.00 | 200.00 | |
| G3-017 | Hollow Metal & FRP Doors | 1,500.00 | 1,500.00 | 0.00 | 0.00 | 1,500.00 | 100.00 | 0.00 | 75.00 | |
| G3-018 | Overhead Doors | 17,500.00 | 17,500.00 | 0.00 | 0.00 | 17,500.00 | 100.00 | 0.00 | 875.00 | |
| G3-019 | Trolley & Hoist | 2,000.00 | 2,000.00 | 0.00 | 0.00 | 2,000.00 | 100.00 | 0.00 | 100.00 | |
| G3-020 | Plumbing | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 250.00 | |
| G3-021 | HVAC | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 500.00 | |
| G3-022 | Painting | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 600.00 | |
| Subtotal | 380,000.00 | 378,800.00 | 0.00 | 0.00 | 378,800.00 | 99.68 | 1,200.00 | 18,940.00 | ||
| G4-000 | Grinder w/RotatingScreen&Auger | |||||||||
| G4-001 | Screen | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 9,000.00 | |
| Subtotal | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 9,000.00 | ||
| G5-000 | PrecastPost TensionedSBR Tanks | |||||||||
| G5-001 | Bulk Excavate SBR Structure | 100,000.00 | 100,000.00 | 0.00 | 0.00 | 100,000.00 | 100.00 | 0.00 | 5,000.00 | |
| G5-002 | Stone Underslab-SBR Structure | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 1,500.00 | |
| G5-003 | Concrete Base Slab for SBR | 690,000.00 | 690,000.00 | 0.00 | 0.00 | 690,000.00 | 100.00 | 0.00 | 34,500.00 | |
| G5-004 | Backfill Tank | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 1,000.00 | |
| G5-005 | Walls & Walkways | 750,000.00 | 750,000.00 | 0.00 | 0.00 | 750,000.00 | 100.00 | 0.00 | 37,500.00 | |
| G5-006 | Misc Metals | 60,000.00 | 57,000.00 | 0.00 | 0.00 | 57,000.00 | 95.00 | 3,000.00 | 2,850.00 | |
| Subtotal | 1,650,000.00 | 1,647,000.00 | 0.00 | 0.00 | 1,647,000.00 | 99.82 | 3,000.00 | 82,350.00 | ||
| G6-000 | Treatment Building | |||||||||
| G6-001 | Excavate Footers | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 2,000.00 | |
| G6-002 | Pour Footers | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 |
Application and Certificate For Payment -- page 6
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18
Date: 05/31/10
Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo | |
|---|---|---|---|---|---|---|---|---|---|---|
| Previous Application | This Period | |||||||||
| G6-003 | Pour Pier Footers | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 500.00 | |
| G6-004 | Pour Piers | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 400.00 | |
| G6-005 | Masonry Frost Walls | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 750.00 | |
| G6-006 | Backfill | 8,000.00 | 6,400.00 | 0.00 | 0.00 | 6,400.00 | 80.00 | 1,600.00 | 320.00 | |
| G6-007 | Stone Under Slab | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 300.00 | |
| G6-008 | Plumbing Under Slab | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 500.00 | |
| G6-009 | Concrete Slab | 18,000.00 | 17,100.00 | 0.00 | 0.00 | 17,100.00 | 95.00 | 900.00 | 855.00 | |
| G6-010 | Precast Flocculation Tank | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 1,750.00 | |
| G6-011 | Precast Effluent Storage Tank | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 1,000.00 | |
| G6-012 | Poured In Place UV Channel | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 1,250.00 | |
| G6-013 | Masonry | 72,000.00 | 72,000.00 | 0.00 | 0.00 | 72,000.00 | 100.00 | 0.00 | 3,600.00 | |
| G6-014 | Structural Steel & Deck | 28,000.00 | 28,000.00 | 0.00 | 0.00 | 28,000.00 | 100.00 | 0.00 | 1,400.00 | |
| G6-015 | Misc Metals | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 1,250.00 | |
| G6-016 | FRP Grating | 10,000.00 | 7,500.00 | 0.00 | 0.00 | 7,500.00 | 75.00 | 2,500.00 | 375.00 | |
| G6-017 | Dryvit | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 1,750.00 | |
| G6-018 | EPDM Roofing | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 2,000.00 | |
| G6-019 | Caulking | 5,000.00 | 2,500.00 | 2,500.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 250.00 | |
| G6-020 | Hollow Metal & FRP Doors | 2,500.00 | 2,250.00 | 0.00 | 0.00 | 2,250.00 | 90.00 | 250.00 | 112.50 | |
| G6-021 | Overhead Doors | 19,500.00 | 19,500.00 | 0.00 | 0.00 | 19,500.00 | 100.00 | 0.00 | 975.00 | |
| G6-022 | Painting | 35,000.00 | 31,500.00 | 0.00 | 0.00 | 31,500.00 | 90.00 | 3,500.00 | 1,575.00 | |
| G6-023 | Top Entry Mixer | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 1,000.00 | |
| G6-024 | Plumbing | 23,000.00 | 23,000.00 | 0.00 | 0.00 | 23,000.00 | 100.00 | 0.00 | 1,150.00 | |
| G6-025 | HVAC | 50,000.00 | 40,000.00 | 7,500.00 | 0.00 | 47,500.00 | 95.00 | 2,500.00 | 2,375.00 | |
| Subtotal | 575,000.00 | 553,750.00 | 10,000.00 | 0.00 | 563,750.00 | 98.04 | 11,250.00 | 28,187.50 | ||
| G7-000 | SBR/Chem Feed & Process Piping | |||||||||
| G7-001 | SBR Equipment | 790,000.00 | 782,100.00 | 7,900.00 | 0.00 | 790,000.00 | 100.00 | 0.00 | 39,500.00 | |
Application and Certificate For Payment -- page 7
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18 Date: 05/31/10 Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed Previous Application | Work Completed This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G7-002 | Polymer Feed System | 18,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 50.00 | 9,000.00 | 450.00 | |
| G7-003 | Chem Feed Pumps & Piping | 18,000.00 | 16,200.00 | 0.00 | 0.00 | 16,200.00 | 90.00 | 1,800.00 | 810.00 | |
| G7-004 | Inline Static Mixers | 25,500.00 | 25,500.00 | 0.00 | 0.00 | 25,500.00 | 100.00 | 0.00 | 1,275.00 | |
| G7-005 | Inline Grinder | 8,500.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 8,500.00 | 0.00 | |
| G7-006 | Utility Water Pumps & Controls | 80,000.00 | 80,000.00 | 0.00 | 0.00 | 80,000.00 | 100.00 | 0.00 | 4,000.00 | |
| G7-007 | Instrumentation & Controls | 127,000.00 | 107,950.00 | 0.00 | 0.00 | 107,950.00 | 85.00 | 19,050.00 | 5,397.50 | |
| G7-008 | FRP Chemical Tank | 25,000.00 | 22,500.00 | 2,500.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 1,250.00 | |
| G7-009 | Process Piping | 245,000.00 | 232,750.00 | 0.00 | 0.00 | 232,750.00 | 95.00 | 12,250.00 | 11,637.50 | |
| G7-010 | Relocated Apple Brook Pump | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 400.00 | |
| Subtotal | 1,345,000.00 | 1,284,000.00 | 10,400.00 | 0.00 | 1,294,400.00 | 96.24 | 50,600.00 | 64,720.00 | ||
| G8-000 | Filtration & UV System | |||||||||
| G8-001 | Disk Filters | 470,000.00 | 470,000.00 | 0.00 | 0.00 | 470,000.00 | 100.00 | 0.00 | 23,500.00 | |
| G8-002 | Filter Feed Pumps | 10,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 10,000.00 | 0.00 | |
| G8-003 | UV System | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 9,000.00 | |
| Subtotal | 660,000.00 | 650,000.00 | 0.00 | 0.00 | 650,000.00 | 98.48 | 10,000.00 | 32,500.00 | ||
| G9-000 | Sludge Digestion & Post EQTank | |||||||||
| G9-001 | Demo Interior | 20,000.00 | 0.00 | 20,000.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 1,000.00 | |
| G9-002 | Sandblasting & Painting | 160,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 160,000.00 | 0.00 | |
| G9-003 | Course Bubble Diffuser | 30,000.00 | 25,550.00 | 0.00 | 0.00 | 25,550.00 | 85.17 | 4,450.00 | 1,277.50 | |
| G9-004 | Centrifugal Blower Recondition | 20,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 40.00 | 12,000.00 | 400.00 | |
| G9-005 | Aeration Tank Rehabilitation | 45,000.00 | 0.00 | 22,500.00 | 0.00 | 22,500.00 | 50.00 | 22,500.00 | 1,125.00 | |
| Subtotal | 275,000.00 | 33,550.00 | 42,500.00 | 0.00 | 76,050.00 | 27.65 | 198,950.00 | 3,802.50 | ||
| GG10-000 | Sludge Dewatering BldgAddition | |||||||||
| GG10-001 | Demo Centrifuge | 8,000.00 | 0.00 | 8,000.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 400.00 | |
| GG10-002 | Demo Building | 10,000.00 | 0.00 | 10,000.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 500.00 | |
| GG10-003 | Sawcut Floor | 8,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 8,000.00 | 0.00 |
Application and Certificate For Payment -- page 8
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18 Date: 05/31/10 Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed Previous Application | Work Completed This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| GG10-004 | Excavate Footers | 12,000.00 | 0.00 | 12,000.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 600.00 | |
| GG10-005 | Form & Pour Footers | 8,000.00 | 0.00 | 8,000.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 400.00 | |
| GG10-006 | Masonry Frost Walls | 20,000.00 | 0.00 | 20,000.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 1,000.00 | |
| GG10-007 | Backfill | 6,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6,000.00 | 0.00 | |
| GG10-008 | Underslab Plumbing | 5,000.00 | 0.00 | 5,000.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 250.00 | |
| GG10-009 | Misc Metals | 10,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 10,000.00 | 0.00 | |
| GG10-010 | Pour Concrete Slab | 10,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 10,000.00 | 0.00 | |
| GG10-011 | Masonry Walls | 35,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 35,000.00 | 0.00 | |
| GG10-012 | Dryvit | 25,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 25,000.00 | 0.00 | |
| GG10-013 | Frames & Doors | 1,500.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1,500.00 | 0.00 | |
| GG10-014 | Overhead Doors | 6,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6,000.00 | 0.00 | |
| GG10-015 | Trolley & Hoist | 4,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 4,000.00 | 0.00 | |
| GG10-016 | Carpentry | 39,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 39,000.00 | 0.00 | |
| GG10-017 | Painting | 20,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 20,000.00 | 0.00 | |
| GG10-018 | Plumbing | 5,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 5,000.00 | 0.00 | |
| GG10-019 | HVAC | 7,500.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 7,500.00 | 0.00 | |
| GG11-000 | Sludge DewateringSystem & Pipe | |||||||||
| GG11-001 | Centrifuge | 525,000.00 | 346,215.00 | 0.00 | 0.00 | 346,215.00 | 65.95 | 178,785.00 | 17,310.75 | |
| GG11-002 | Progressive Conveying System | 7,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 7,000.00 | 0.00 | |
| GG11-003 | Sludge Conveying System | 18,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 18,000.00 | 0.00 | |
| GG11-004 | Process Pipe | 200,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 9.00 | 182,000.00 | 900.00 | |
| GG12-000 | Site Paving | |||||||||
| GG12-001 | Lump Sum | 50,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 50,000.00 | 0.00 | |
| GG13-000 | Engineered Fill | |||||||||
| GG13-001 | Lump Sum | 4,400.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 4,400.00 | 0.00 | |
| GG14-000 | Flowable Fill |
Application and Certificate For Payment -- page 9
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18
Date: 05/31/10
Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo | |
|---|---|---|---|---|---|---|---|---|---|---|
| Previous Application | This Period | |||||||||
| GG14-001 | Lump Sum | 11,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 11,000.00 | 0.00 | |
| GG18-000 | Alternate G-18 | |||||||||
| GG18-001 | Lump Sum | 125,000.00 | 125,000.00 | 0.00 | 0.00 | 125,000.00 | 100.00 | 0.00 | 6,250.00 | |
| Subtotal | 1,180,400.00 | 489,215.00 | 63,000.00 | 0.00 | 552,215.00 | 46.78 | 628,185.00 | 27,610.75 | ||
| Application Total | 7,869,424.34 | 6,563,865.00 | 187,674.34 | 0.00 | 6,751,539.34 | 85.79 | 1,117,885.00 | 337,576.97 | ||
[Handwritten top right: 5. MINUTES a. 6 pgs]
DRAFT #2
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
May 10, 2010
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday May 10, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Joseph McCawley, Dana Pizarro and Michael Steinberger. Also in attendance were: Rick Smith, Township Manager; Scott Towler from Brickhouse Environmental; Evan Andrews, Authority Engineer; Bob Adams, Authority Solicitor, Ellen Carmody, Historical Commission; and Megan Hedgecock, Planning Commission.
COMMON ACRONYMS:
| MA - Municipal Authority | I&I - Inflow & Infiltration |
|---|---|
| HC - Historical Commission | RCSTP - Ridley Creek Sewer Treatment Plant |
| PC - Planning Commission | LCSTP - Lochwood Chase Sewer Treatment Plant |
| CB - Conservancy Board | DEP - Department of Environmental Protection |
| PR - Park & Recreation Board | EPA - Environmental protection Agency |
| BOS - Board of Supervisors | NPDES - National Pollutant Discharge Elimination System |
| SSO - Sanitary System Overflow | WAS - Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
2. RCSTP REPORTS
- Brickhouse Report - Scott reported that Phase I of the Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project has largely been completed as of May 5, 2010. There are a few equipment issues from phase I which need to be resolved that will carry over into phase II. These issues were not believed to be significant enough to discontinue moving forward with the remaining phases. During the month of April, final preparations were completed to allow the SBRs to be filled with treated effluent from the existing treatment plant to simulate the treatment process. Using several electric pumps, treated effluent was transferred from the effluent overflow box into the dog house manhole where it flowed by gravity through the Screen Building into the influent lift station. The influent lift station pumped the water into one of the four (4) SBRs. The SBRs cycled through all of the treatment cycles in the same manner as if they contained mixed liquor suspended solids with raw wastewater. Representatives from Siemens were on site to provide training and start up services. During this “wet test” period, the Authority Staff assisted Worth & Company to simulate plant operation during a significant rain event. Additionally, power failures were simulated to evaluate the effect of the treatment plant equipment. Items of concern included replacing a failed overload relay for SBR number 3 mixer pump, Siemens UV lamp bank number 1 (which has been resolved), and the Aqua Aerobics disc filter control panel. Correction actions for the Siemens and Aqua Aerobics control panel will carry over into Phase II.
MA Minutes 05/10/2010 1
[Handwritten top right: 2 of 6]
Key administrative and contractual items on task for presentation to the Authority Board members include discussion of Worth & Company's letter dated February 15, 2010 requesting change in the substantial completion date of June 30, 2010 to September 30, 2010 and Clinger letters dated March 15, 2010 and April 30, 2010.
Mike asked if there are any problems, delays, etc. anticipated with start up. Regarding the existing drain line in the treatment plant, Worth said it was out of their scope and not shown on the proposed plan. Evan confirmed that they did install a new pipe. On day 2 the SBRs were short cycling and quality of the effluent was not good. Now they are working on a normal 6 hour cycle. DEP representatives have been out twice and are pleased with what they see. Three existing metal tanks are empty and being cleaned. There will be a 5 day continuous run when all phases are complete.
b. Tank Cleaning Bid – The bid went to Aqua with the lowest bid of $24,234.00. Other bids received were:
US Environmental $25,014.00
Franc Environmental $34,016.00
Russell Reed $34,586.00
McGovern Environmental $46,534.00
RCSTP CHANGE ORDERS
A. None
3. RCSTP INVOICES
A. Grainger, #9217937037, 3/31/10, $275.50 and Grainger #9228782778, 4/14/10, $641.98 and Grainger #9231297822, 4/16/10, $28.58. Joe moved to approve payment of these 3 invoices. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
B. Continental Fire & Safety, #37184, 4/15/10, $1,127.48. Mike moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
C. Brickhouse Environmental, #5333, 5/3/10, $11,931.25. Joe moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
D. Worth & Co., #P28001, 4/30/10, $170,263.75. Joe moved to approve payment. Fran seconded the motion. Discussion followed regarding the fact that Worth & Co. still has not submitted the invoice properly to show change order credits of $42,700. The motion was opposed unanimously. Rick will direct staff that this won't be paid until properly submitted.
E. Wm. H. Clinger Corp, #EGMA0707, 5/2/10, $34,539.38. Mike moved to approve payment. Dana seconded the motion. Joe pointed out that the note on page 18 stating that “upon receipt Clinger will pay....” is not a release of liens. They must use the proper form, and the form must be signed and notarized. Liens have to be received before payment is given in order to be sure the subcontractors have been paid. Mike changed the motion to
MA Minutes 05/10/2010 2
Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205
Invoice
Number: 117366
Date: 28-May-2010
P.O. Number:
Job Description: 2-tank cleanings
Order Num: 161112
Serviced: 15-May-2010
BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
JOB SITE:
Ridley Creek STP
Town Drive & Line Road
West Chester, PA
| Quantity | ServiceType | Amount | Tax | Warranty & Expiration | Extension |
|---|---|---|---|---|---|
| 1 | Disposal Charges TOTAL OF 54 TONS OF GRIT @ 96.00-A TON-SEE ATTACHED BREAKDOWN |
$5,184.00 | No | 0 Days | $5,184.00 |
| 1 | Disposal Charges TOTAL OF 153,100 GALLONS OF SLUDGE @ .227 A GALLON-SEE ATTACHED BREAKDOWN |
$34,753.70 | No | 0 Days | $34,753.70 |
| Taxable Amount: $0.00 | Tax Rate: 0 | Tax: $0.00 | Description: PA Tax Exempt | Subtotal NonTaxed: $39,937.70 Subtotal Taxable: $0.00 Subtotal Tax: $0.00 |
|---|---|---|---|---|
| Payment Terms: Net 30 | Payment: $0.00 | Adjustment: $0.00 | Late Charge: $0.00 | Please Pay: $39,937.70 |
PA State Homeowner Protection Act, Registration #PA022859
A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-7452
Please detach here and return the bottom portion with your payment.
From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| Order No. | Invoice No. | Date | Amount Due |
|---|---|---|---|
| 161112 | 117366 | 28-May-2010 | $39,937.70 |
| Serviced 15-May-2010 | |||
To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552
[Handwritten note: Back For MA MTS [signature]]
[Handwritten top right: 3 of 6]
payment is approved contingent upon receipt of properly signed and notarized liens from the beginning of the contract. Joe seconded this motion. There was no further discussion or public comment. The motion passed unanimously.
F. Pennoni, #438249, 5/5/10, $18,810.50. Dana moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
Mike noted that regarding the invoices, he wants Evan's signature on all copies before the meeting starts.
4. CHAIRMAN'S REPORT
A. Jack thanked Dana for making it possible for him to attend the PMAA meeting. It was very interesting.
B. Jack went to the West Goshen meeting. They approved the Board's request.
C. Jack acknowledged the invitation to the joint ABC meeting on Saturday, May 15, 2010 from 8:30 to 11:00 am.
5. APPROVAL OF MINUTES
A. Joe moved to approve the minutes of the April 12, 2010 meeting as corrected. Dana seconded the motion. The motion passed unanimously.
6. ENGINEER'S REPORT
Evan reported that construction phase services continue including: progress meetings with the Contractors and Township every other Thursday; observation services continue, including coordination and communication with Brickhouse and the Township; receipt, review, and return of Contractor submittals; negotiation, review, and approval of Payment Requests.
A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail. At present the current authorized schedule (11/2009 to 6/2010) is approximately 75% complete and budget is approximately 92% expended. Equipment start-up, “SBR seeding”, and contractor RFI's and coordination has been consuming much of our time for the past three months.
I/I Metering Project –The Township continues to meter flows at selected locations.
Ridley Creek Consent Order – Temporary flow meters have been installed by the Township at the locations noted above under “I/I Metering Project”. Public Works has been aggressively locating and repairing sewers and laterals where I/I is observed.
The third Semi-Annual Report was prepared and submitted to DEP on March 26, 2010 as required by the CO&A. No comments have been received. The next report is due to DEP by September 30, 2010.
MA Minutes 05/10/2010 3
[Handwritten top right: 4 of 6]
LCSTP Elimination, Hershey Mill PS Diversion, Reserve (Sherman) PS and Marydell PS Elimination Planning – The updated reports will be available this month.
7. APPROVAL OF INVOICES
A. Gawthrop Greenwood, #78561, 3/31/10, $627.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously
B. Gawthrop Greenwood, #78562, 3/31/10, $304.00. Mike moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously
C. Pennoni, #438211, 5/3/10, $315.00. Fran moved to approve payment. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously
D. Pennoni, #438212, 5/3/10, $367.50. Joe moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously
8. LIAISON REPORTS
A. Historical Commission – Ellen noted that Living History Day is June 5, 2010. The Town Tours and Village Walks are July 22, 2010. They will use a Revolutionary theme. Since this is a County-wide event, they need lots of help with parking, etc.
B. Planning Commission – Megan reported that they recommended approval of the National Bank of Malvern plan.
9. FINANCIAL REPORTS
Rick stated that the grant was received and contracts sent to Worth.
10. GOALS
Jack has the article ready for the Township Newsletter. Dana will attend the 2nd Quarter West Goshen meeting on June 2, 2010.
11. OLD BUSINESS
A. Budget for 2010 – An update was included in the May packet. It was broken down as Mike requested. Mike moved to approve the 2010 Operating budget as amended. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
Mike moved to approve the Ridley Creek Budget as presented. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
B. Applebrook Spray Permit. Rick will send a letter to Hank Berber at Applebrook regarding this issue.
MA Minutes 05/10/2010 4
C. The Board reviewed and discussed Pennoni’s response to the Wm. Clinger Corp. letters. Rick will forward it to Clinger stating that the Board would like to meet with them to discuss it.
12. NEW BUSINESS
A. Diffuser Heads - Evan noted that they will need 48 new diffuser heads at $65 each plus labor, etc. Joe moved to authorize the purchase and installation of diffuser heads up to $10,000.00. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
B. Pennoni – Joe noted that Pennoni has been over by 30% each month. Of the money allocated to carry through to June 30, 2010, there is only $8,000.00 left. Pennoni has been invoicing $18,000.00 per month. Evan explained the amount of work being done. Joe moved to raise the allowance for Pennoni’s services to 6/30/2010 by $22,000.00. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
13. CAPACITY REQUESTS
None
14. SEWER REPORTS
Mark Miller’s written report follows:
Meter: Meters were read on a daily basis. The portable meters are being read on a weekly bais.
C.C. Collection – We have been busy making repairs to the system. To date, we have repaired 8 major breaks. We have several more to replace.
R.C. Collection - We have made several repairs to the system. We will be replacing manhole covers in the Bowtree Development due to large pick holes.
Plants – The plants are running well, no problems to report.
Ridley Creek Plant – As I reported earlier, the plant went live on May 4, 2010.
PA One Calls – 112 PA One Calls for the month of April 2010.
Alarms – 14 alarms for the month of April
15. ANY OTHER MATTER
None
16. CORRESPONDENCE
None
MA Minutes 05/10/2010 5
17. PUBLIC COMMENT
None
19. ADJOURNMENT
There being no further business, Mike moved to adjourn the meeting. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The public meeting was adjourned at 9:30 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 05-10-10 DRAFT2.doc
MA Minutes 05/10/2010 6
5. MINUTES
b
3pg
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
SPECIAL MEETING MINUTES
May 20, 2010
The East Goshen Township Municipal Authority held a special meeting on Thursday May 20, 2010 at 8:00 a.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Joseph McCawley (by phone), and Dana Pizarro. Also in attendance were: Rick Smith, Township Manager; Scott Towler and Dave Evans from Brickhouse Environmental; Evan Andrews, Authority Engineer; Bob Adams, Authority Solicitor, and Carmen Battavio, Township Supervisor.
COMMON ACRONYMS:
| MA- Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lochwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 8:00 a.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
2. NEW BUSINESS
a. Worth, application No. 17, 4/30/10, $170,263.75. After consultation with the counselor, Rick reported that this invoice should be paid. Worth agreed to a 2 day extension to July 2, 2010. They will apply the credit when the payment is authorized. Dana moved to approve payment of the Worth application No. 17 for $170,263.75 and to authorize a 2-day extension to July 2, 2010 and authorize Jack to sign the change order. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
b. Worth Change Orders
1. PCO-19, 5/17/10, $27,702.20. This is for replacing the air drops in the former aeration (DAVCO) tanks with a time extension of 4 days. The existing aeration diffusers are beyond repair and must be replaced. The drop Pipes are pitted and should be replaced. This is not included in the original contract. There will be 48 diffusers. Stainless steel is required so Dana asked that it be included in the materials description. Fran moved to approved payment and include Stainless Steel in the description. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
2. PCO-20, 5/17/10, $3,516.77. This is for 2 additional doors in the dewatering building per Township request. They are rusted through at the bottom. The skylight will be removed and block work will be installed. This PCO has a time extension of 1 day. Dana moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
MA Minutes 05/20/2010 1
3. PCO-21, 5/17/10, $18,094.59. This is to sandblast and paint the existing DAVCO walkways per Township request with a time extension of 6 days (need to verify number of days with Worth). This PCO is necessary since the walkway is no longer being removed in order to give better access to the sludge digesters. The Contract had called for these to be removed. This includes a credit of $4,000.00 which was the cost to demolish. They are rusted but the supports are sound. Joe said to be sure there is a welder at the inspection to take care of any spots. Also, specify epoxi paint will be used and the surface prep and finish will be the same as the other walkways. Joe moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
4. PCO-22, 5/17/10, CREDIT amount of $13,875.00. This is to DELETE concrete removal in the DAVCO clarifier floor and raising the fill and draw piping by approximately 13 inches. The impact to the project is a change in operating levels in the post-equalization tank which can be accommodated with no other changes. There is no time extension involved with the PCO. Joe moved to approve PCO-22. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
C. Additional Items of Discussion
1. An additional PCO is being prepared by Worth for sandblasting and painting the existing equalization tank per Township request. The ESTIMATED value of the PCO is in the amount of $21,000 for the tank interior and $19,000 for the tank exterior. According to Worth, there is a possibility to reduce this price if alternate steel preparation and painting specifications were allowed. The reduction is reported to be in the 30% to 40% range. Joe recommended doing the interior but wait to go to bid for the exterior. The condition of the tank is the same as the others. Decision on this was deferred.
2. The sludge dewatering building walls were to remain and the rest of the building added on. The plain masonry walls now are not as sturdy as anticipated. It is recommended to take down the wall so the new work is knitted in cleanly. The roof above is already gone. Cost has not been determined but will include removal of the wall down to the existing slab, build up the wall, finish it and frame in the door. It was suggested that 2 more options be considered, drill the walls and fill with concrete or buttress inside to tie to the main wall.
Jack moved to authorize Rick Smith to move forward with this project if the cost is under $5,000.00. If it is over $5,000.00, the Authority will decide by email how they want to proceed. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
Mark will send photos of these areas to the Authority members.
MA Minutes 05/20/2010 2
3. PUBLIC COMMENT
None
4. ADJOURNMENT
There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The meeting was adjourned at 8:40 a.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 05-20-10 SPECIAL MTG DRAFT.doc
MA Minutes 05/20/2010 3
5. MINUTES
C.
1pg
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
SPECIAL MEETING MINUTES
June 7, 2010
The East Goshen Township Municipal Authority held a special meeting on Monday, June 7, 2010 at 9:00 a.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, and Joseph McCawley (by phone). Also in attendance were: Rick Smith, Township Manager; Scott Towler Brickhouse Environmental; and Mark Miller, Public Works Director.
COMMON ACRONYMS:
| MA- Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lochwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 9:00 a.m.
2. NEW BUSINESS
a. Centrifuge – Scott reported regarding the platform the centrifuge is to be installed upon. The original plan called for a total height of 9 feet. The vertical distance has to be increased to 9 feet 6 inches. Pennoni provided an alternate plan using concrete piers 5 feet high and an I beam. This cost may be over $5,000.00. Pennoni will provide the updated plan tomorrow. Galvanized steel is preferred but takes time to produce. A decision was made to use epoxy coated steel. Mount Pleasant is used by Worth to get steel.
Joe moved to authorize Mark Miller to spend up to $10,000.00 for a steel and concrete foundation for the centrifuge. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
3. ADJOURNMENT
There being no further business, Fran moved to adjourn the meeting. Jack seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The meeting was adjourned at 9:30 a.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 06-07-10 SPECIAL MTG DRAFT.doc
MA Minutes 06/07/2010 1
7 INVOICES
COPY
CHECK REQUEST FORM
| Approved: | |
|---|---|
| Date Paid: | |
| Check # | |
| Charged to: | 07424 7454 |
Date Form submitted: 5/20/10
Date & Time Check Needed: ____________________
Pay to the Order of: EAST GOSHEN TWP
Mailing Address: ____________________
____________________
____________________
Amount of Check: 142.47
Special Instructions: (Check One)
[ ] Mail Check REGULAR MAIL
[ ] Mail Check: EXPRESS MAIL
[ ] Return Check to Requester
[ ] Hold Check until: ____________________
Explanation of Expenses: Reimburse Gen Fund for 07 - MA Construction Expense office supplies - STAPLES
Request Submitted by: ____________________
STAPLES - 7972 3100 0025 0128
Vendor #1297
5/9/2010
| DATE | Invoice Amt. | 5422.3700 | 1401.3000 | 1437.2460 | 5420.3702 | 1429.3000 | Description |
|---|---|---|---|---|---|---|---|
| 4/12/2010 | 4.20 | 4.20 | Notebooks | ||||
| 4/17/2010 | 142.47 | 142.47 | Office Supplies - Ridley Creek | ||||
| 4/29/2010 | 105.99 | 105.99 | Seagate - Desktop | ||||
| Total: | 252.66 | 105.99 | 142.47 | 4.20 | 0.00 | 0.00 |
To be reimbursed by MA Construction Fund
Statement Total: $252.66
| Approved: | |
|---|---|
| Date Paid: | |
| Check #: | |
| Charged to: | _ SEE ABOVE DISTRIBUTION |
5/20/2010
STAPLES
that was easy.
Low prices. Every item. Every day.
105 E. Swedesford Road
Exton, PA 19341
(610) 594-2553
SALE
1499986 10 001 2
0066 04/17/10 1
QTY SKU PRICE
*****Special Promotion*****
*****Limit 1 at 6.99 ea*****
1 HP 2GB USB FLASH D 751492381039 6.99
Regular Price 12.99ea
Special Savings -6.00ea
1 HP 2GB USB FLASH D 751492381039 12.99
**********************************
1 GE DUPLEX INWALL A 030878861915 5.29
1 RECORD BOOK 300 PG 718103077811 23.99
1 RECORD BOOK 300 PG 718103077811 23.99
1 ATT CRDED SPRPHONE 650530018961 29.99
1 CL BLK KOSKIN 24 C 085854106870 9.99
1 STAPLES 290 DESKTO 718103112499 13.99
1 SPLS 25PK DBLSIDE 718103020565 7.19
SUBTOTAL 134.40
Standard Tax 6.00% 8.07
TOTAL $142.47
Staples Charge 142.47
Card No.: XXXXXXXXXXXX0128 [S]
Auth No.: 017241
TOTAL ITEMS 9
APPROVED BY: [signature]
DATE PAID: ____________________
CHECK #: ____________________
CHARGED TO: 07424-7452
office supply
COPY
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/30/2010
Client No: 6604-01M
Invoice No. 79415
General Authority Services
Fees
| Date / Initials | Description | Hours | Total |
|---|---|---|---|
| 04/09/2010 RFA |
Review packet for Authority meeting of 4/12/10. | 0.50 | |
| 04/12/2010 RFA |
Attend regular meeting of Authority. | 2.00 | |
| For Current Services Rendered | 2.50 | 475.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.50 | $190.00 | $475.00 |
| Previous Balance | $627.00 |
|---|---|
| Total Current Charges | 475.00 |
| 04/22/2010 Fee Payment | -475.00 |
| Balance Due | $627.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
COPY
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/30/2010
Client No: 6604-06M
Invoice No. 79416
Ridley Creek Treatment Plant Upgrades/ Expansion
Fees
| Date / Initials | Description | Hours | Total |
|---|---|---|---|
| 04/12/2010 RFA |
Attend executive session of Authority to discuss Clinger and Worth issues relating to RCSTP. | 1.00 | |
| 04/13/2010 RFA |
Review correspondence from Clinger dated March 15, 2010 and multiple exhibits attached thereto regarding reasons for delay and increased cost. | 1.00 | |
| 04/14/2010 RFA |
Review message from Rick Smith with proposed letter to Clinger. | 0.40 | |
| 04/14/2010 RFA |
Message to Rick Smith regarding letter to Clinger for meeting date. | 0.30 | |
| 04/16/2010 RFA |
Review Clinger and Worth agreements and associated contract documents. | 1.20 | |
| 04/23/2010 RFA |
Conference with Rick Smith, Authority members and consultants regarding resolution of Clinger claim. | 1.50 | |
| 04/27/2010 RFA |
Telephone conference with Rick Smith regarding Aqua PA tank cleaning bid. | 0.30 | |
| For Current Services Rendered | 5.70 | 1,083.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 5.70 | $190.00 | $1,083.00 |
| Previous Balance | $304.00 |
|---|---|
| Total Current Charges | 1,083.00 |
East Goshen Municipal Authority
Ridley Creek Treatment Plant Upgrades/ Expansion
Page: 2
04/30/2010
Client No: 6604-06M
Invoice No. 79416
| 04/22/2010 | Fee Payment | -57.00 |
|---|---|---|
| Balance Due | $1,330.00 | |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
10. GOALS
2 pgs
2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
JUNE REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - completed; Need by 8/11/10 Joe; Need by 11/10/10 Dana
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana; 3 rd Quarter (September) Joe; 4 th Quarter (December) Jack
- Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10).
- Implement I & I Plan. - Ongoing – March Report filed
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction.
- Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. SBR Tour conducted on 3/15/10
- Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. SBR Class conducted on 3/15/10
- Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project.
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\061410c.doc
2 of 2
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
- Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project.
FUNDING
- H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. We have submitted the payment request.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\061410c.doc
11 OLD BUSINESS
Differ To June mtg
2 pgs
RECEIVED AFTER AGENDA WAS PRINTED
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
February 3, 2010
10-16507
Rick Smith, Township ManagerEast Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Chester Creek Sewage Collection System Modeling
Estimated Fee and Schedule
Dear Mr. Smith:
As discussed January 29, 2010, we recommend that a hydraulic model be developed for the Township’s Chester Creek Sewage Collection System similar to the model developed in 2009 for the Ridley Creek Sewage Collection System. The purpose of this modeling is to determine if any physical constraints exist which would not allow for the conveyance of peak wet weather flow to West Goshen as well as the effect of future development within this service area and diversions from the service area to the Ridley Creek Sewage Collection System.
SCOPE OF WORK
The estimated fee and schedule presented here is for model development, analysis, and mapping updates.
- Collect sewer plans previously scanned by the Township
- Review these plans and develop a network model of the sewage collection system
- Estimate base flows into the sewer network at selected “nodes”
- Using sewer data on the available plans (pipe lengths, sizes, materials and elevations), construct a hydraulic model of the sewer system using SewerCAD, a software package created to analyze sewer systems.
- Calibrate the hydraulic model using available flow meter data collected under the inflow and infiltration abatement program as well as the Township’s permanent meters.
- Project wet weather peak flows in the sewer system using the meter data.
- Estimate future flows through the sewer system using data available in the Township’s Chapter 94 Reports. Apply the future flows to the base flows and re-run the hydraulic model for future dry weather and wet weather flows.
PRO WG Sewer Modeling.doc
One Drexel Plaza • 3001 Market Street, 2nd Floor • Philadelphia, PA 19104 • Tel: 215-222-3000 • Fax: 215-222-0384
www.pennoni.com
2 of 2
10-16507
February 3, 2010
Page 2
Rick Smith, Township Manager
Chester Creek Collection System Modeling
- Identify physical constraints on the sewer system that do not allow for the conveyance of peak wet weather flow to West Goshen, if any.
- For identified constraints, if any, develop and conduct a brief evaluation of alternatives to relieve the constraint.
- Prepare a report summarizing the model development, analysis and identified constraints, if any, and alternatives to relieve the constraints.
SCHEDULE
Immediately upon authorization we will initiate the model development and analysis. Note that we have already collected the majority of sewer maps as available from the Township in an effort to expedite the schedule.
ESTIMATED FEE
The estimated fee for this scope of work is $26,900.00, to be billed on an hourly basis at our standard rates established in our current Engineering Services Agreement. Please note that this estimated fee does not include surveying services that might be necessary to locate or verify sewer locations or elevations in the field. These services, if needed, can be provided at our standard rates.
Should you have any questions or need additional information, please do not hesitate to call.
Very truly yours,
PENNONI ASSOCIATES INC.
[signature]
Evan R. Andrews, P.E.
Authority Engineer
PRO WG Sewer Modeling.doc
12. NEW BUSINESS
a.
8 pgs
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
| Date: | June 10, 2010 |
|---|---|
| To: | Municipal Authority |
| From: | Rick Smith, Township Manager |
| Re: | Ridley Creek Sewer Plant Project Outstanding Issues |
Completion – The current date for substantial completion is August 6, 2010.
Pennoni – At your meeting on May 10th you authorized an additional $22,000 for construction services which brought the budget up to $121,700. Upon the payment of the current invoice there will be a balance of $10,500. I would suggest that you authorize another $22,000 to get us thru July.
Brickhouse – Our agreement with Brickhouse contemplated that substantial completion would occur in June. I have asked them to modify their work sheet to reflect he fact that it will not occur as scheduled. They have projected their hours and costs thru the Authority meeting in September. If we close up everything by that date we will be $22,000 under budget,
Clinger- We are scheduled to meet with Clinger on Friday. I will e-mail a synopsis of the meeting.
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Memo to MA 060910.doc
2 of 8
FILE
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
May 14, 2010
Mr. Evan Andrews, PEPennoni Associates Inc.
One Drexel Plaza
3001 Market Street, Second Floor
Philadelphia, PA 19104
Re: Ridley Creek Sewage Treatment Plant SBR Expansion
Continued Construction Services
Proposal dated May 6, 2010
Dear Evan:
At their meeting on May 10, 2010, the East Goshen Municipal Authority authorized the expenditure of up to $22,000 for continued construction services for the upgrade and expansion of the Ridley Creek Sewer Treatment Plant. This funding is anticipated to cover construction services until June 30, 2010.
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[signature: Rick]
Louis F. Smith, Jr.
Township Manager
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Design\Letter to Pennoni 051410.doc
3 of 8
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
May 6, 2010
EGMA0707
Rick Smith, Township ManagerEast Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: RCSTP Upgrade and Expansion
Continued Construction Services
Dear Mr. Smith:
As you know, Pennoni provided an estimated fee for Continued Construction Services that was accepted and approved by the Authority Board on January 11, 2010. At the time that the estimated fee was prepared (November 4, 2009), the construction was expected to be complete by June 30, 2010. It has since become apparent that the construction will likely continue until September 30, 2010 followed by contract close-out activities.
The approved estimated fee was $99,700.00. As of Pennoni’s current invoice (#438249 dated May 5, 2010), Pennoni has expended $91,817.98 through April 18, 2010. The authorized budget is expected to exceed the current authorization with the next invoice (effort through May 21, 2010).
Over the past 5 months, the rate of effort expended by Pennoni on this project is approximately $18,400 per month. Given the projected construction end date of September 30, 2010 (5 months from now), and approximately 1 month of project close-out activities (punchlist, contractor final application for payment, as-built plans, etc.), Pennoni recommends that the authorized budget for Continued Construction Services be increased by $110,000.00 (rounded).
Pennoni will continue to make every effort to minimize our effort on the project, however given the history of the construction to date, we cannot provide a final estimate of engineering services required to complete this project.
Should you have any questions or need additional information, please do not hesitate to call.
Very truly yours,
PENNONI ASSOCIATES INC.
[signature]
Evan R. Andrews, P.E.
Authority Engineer
One Drexel Plaza • 3001 Market Street • Philadelphia, PA 19104-2897 • Tel: 215-222-3000 • Fax: 215-222-3588
4 of 8
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 440011
Invoice Date: 05/25/2010
Project: EGMA0707
Project Name: RCSTP Expansion
For Services Rendered through: 05/16/2010
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting control problems with UV system, effluent weir plate, and SBR #3 overload; responses to Contractor RFIs; schedule reviews; and review/negotiations of change orders with Township and contractors.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| 01 -- Permit Design | est. | $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. | $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. | $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. | $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. | $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. | $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. | $121,700.00 | $91,817.98 | $111,105.48 | $19,287.50 | |
| Total : | $644,700.00 | $614,683.78 | $633,971.28 | $19,287.50 |
Amount Due This Invoice: $19,287.50
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary
Invoice Date 05-25-2010
| Project: | RCSTP Expansion and Upgrade | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA0707 | ||
| Invoice No: | 440011 | ||
| Invoice Period: | 4/19/2010 | to | 5/16/2010 |
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Contract Amount: | $ 644,700.00 | ||
| Previously Invoiced: | $ 614,683.78 | ||
| Current Invoice: | $ 19,287.50 | ||
| Invoiced to Date ($): | $ 633,971.28 | ||
| Invoiced to Date (%): | 98% | ||
| Remaining Budget ($): | $ 10,728.72 | ||
| Remaining Budget (%): | 2% | ||
Budget by Phase:
| Phase No. | 05 | 06 | 10 |
|---|---|---|---|
| Phase Name: | Construction | Additional Engineering | Continued Eng Svcs |
| Phase Budget: | $ 88,200.00 | $ 10,000.00 | $ 99,700.00 |
| Changes: | $ 48,000.00 | $ 10,000.00 | $ 22,000.00 |
| Contract Amount: | $ 136,200.00 | $ 20,000.00 | $ 121,700.00 |
| Previously Invoiced: | $ 136,197.62 | $ 16,469.18 | $ 91,817.98 |
| Current Invoice: | $ - | $ 3,528.00 | $ 19,287.50 |
| Invoiced to Date ($): | $ 136,197.62 | $ 19,997.18 | $ 111,105.48 |
| Invoiced to Date (%): | 100% | 100% | 91% |
| Remaining Budget ($): | $ 2.38 | $ 2.82 | $ 10,594.52 |
| Remaining Budget (%): | 0% | 0% | 11% |
Comments: Phase 10 - Continued Engineering Services
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; and site observation of construction. Consultation with Township regarding same.
Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting problems with UV system, effluent weir plate and SBR #3 overload; responses to Contractor RFIs; schedule reviews; tracking pressure test failure; and review/negotiations of change orders with Township and contractors.
Invoiced effort does not include effort related to responding to the Electrical Contractor's letter of 3/15/2010.
East Goshen Municipal Authority
EGMA0707 Invoice Summary
Invoice Date 05-25-2010
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 72.75 | 23.00 | 95.75 |
| Senior Engineer | 259.50 | 25.00 | 284.50 |
| Senior Designer | 98.00 | 30.00 | 128.00 |
| Project Engineer | 49.00 | 35.00 | 84.00 |
| Associate Engineer | 7.00 | 0.00 | 7.00 |
| Graduate Engineer | 43.00 | 0.00 | 43.00 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 541.00 | 115.50 | 656.50 |
| Engineering Technician I | 13.50 | 0.00 | 13.50 |
| Administrative Assistant I | 0.50 | 0.00 | 0.50 |
| Totals | 862.75 | 228.50 | 1315.25 |
Budget/Schedule Status (November to June):
Schedule % = 88%
Budget % = 91%
Brickhouse Environmental
Consultants and Engineers
June 10, 2010
Mr. Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Ridley Creek Sewer Treatment Plant Expansion
Project Manager Schedule Supplement
BE Project No. 09-2532-0
Dear Mr. Smith:
This letter's purpose is to notify the Authority of a time extension within the approved original budget estimate for Brickhouse Environmental's role as Project Manager for the Ridley Creek Sewer Plant Expansion and provide the enclosed adjusted Project Management Schedule Supplement.
Brickhouse Environmental's original not to exceed budget ($175,030 at $115 per hour) was based upon a 67 week duration to August 8, 2010. This included Construction Contract Closeout Project Management tasks that extended beyond Construction Substantial Completion.
Approved Change Orders for construction adjustments have extended the estimated Construction Substantial Completion into Week 64. Accordingly, the enclosed Schedule reflects adjustment by extending Brickhouse Environmental's involvement to Week 73 and the Monthly Authority Meeting in September 2010. Despite this time extension and as shown on the enclosed Schedule, Brickhouse Environmental does not expect to reach the original approved $175,030 due to our actual hours, to date, being less than originally estimated. A contingency of hours and value beyond the adjusted Schedule's projected totals remain in the approved original budget for Brickhouse Environmental.
We have enjoyed our association with you and the Authority and hope this information is helpful. Please contact me with any questions.
Best Regards,
David W. Evans
Project Manager
Encl.
cc: Scott Towler, P.E., Project Manager
DWE/ps
J:\092532.0\Correspondence\Projected Totals Letter.doc
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com
When Creativity & Experience Count
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
The original budget estimate was adjusted from 67 weeks for a cumulative $175,030 (at $115/hour) to 73 weeks for the same cumulative $175,030 (at $115/hour) in order to:
1. Reflect actual total as of May 31, 2010 as a new baseline; and
2. Develop a new schedule based upon Substantial Construction Completion in week 64 (18-July-2010) and Construction Contract Closeout in week 73 (19 Sep-2010).
| Week Ending | Projected Totals | Actual Totals | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | ||
| 31-May-10 | Week 58 (1 day) | 4 | 982.25 | $112,959 | $9,660 | 89.8 | 982.25 | $112,958.75 | $10,321.25 |
| 6-Jun-10 | Week 58 (4 days) | 24 | 1,006 | $115,719 | |||||
| 13-Jun-10 | Week 59 | 24 | 1,030 | $118,479 | |||||
| 20-Jun-10 | Week 60 | 24 | 1,054 | $121,239 | |||||
| 27-Jun-10 | Week 61 | 24 | 1,078 | $123,999 | |||||
| 30-Jun-10 | Week 62 (3 days) | 16 | 1,094 | $125,839 | $12,880 | ||||
| 4-Jul-10 | Week 62 (2 days) | 8 | 1,102 | $126,759 | |||||
| 11-Jul-10 | Week 63 | 24 | 1,126 | $129,519 | |||||
| 18-Jul-10 | Week 64 | 24 | 1,150 | $132,279 | |||||
| 25-Jul-10 | Week 65 | 24 | 1,174 | $135,039 | |||||
| 1-Aug-10 | Week 66 | 24 | 1,198 | $137,799 | $11,960 | ||||
| 8-Aug-10 | Week 67 | 24 | 1,222 | $140,559 | |||||
| 15-Aug-10 | Week 68 | 24 | 1,246 | $143,319 | |||||
| 22-Aug-10 | Week 69 | 20 | 1,266 | $145,619 | |||||
| 29-Aug-10 | Week 70 | 20 | 1,286 | $147,919 | |||||
| 31-Aug-10 | Week 71 (2 days) | 6 | 1,292 | $148,609 | $10,810 | ||||
| 5-Sep-10 | Week 71 (3 days) | 12 | 1,304 | $149,989 | |||||
| 12-Sep-10 | Week 72 | 16 | 1,320 | $151,829 | |||||
| 19-Sep-10 | Week 73 | 8 | 1,328 | $152,749 | $4,140 | ||||
The above schedule reflects projected totals. A contingency budget of 194 hours and $22,281 remains to meet the original contract total value.
J:\092532.0\Project Management\PM Schedule\Schedule.xls
Page 1 of 1
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 4, 2010
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | May 2010 Monthly Report |
Meter: Meters were read on a daily basis. We continue to read the portable meters.
C.C. Collection: To date we have repaired 14 INI problems. I have spoken with two plumbers that have stated they have repaired seven sewers where they have found clean out pipe's have separated. We believe this was caused by the frost during the winter.
R.C. Collection: Two more repairs were made for INI.
Pumping Station: All pumping stations were cleaned. The stations were visited on a routine basis. We did experience a problem with the transducer at the Barkway Pumping Station.
Lochwood Plant: The plant was visited by the Public Works Department on a daily basis. The bar screen was cleaned. We did have a problem with one of the floating aerators. Lenni Electric was used to trouble shoot the meter.
Ridley Creek Plant: Was visited on a daily basis. Township personal assisted the plant operator on an as-needed basis. We have had some minor problems with regards to equipment. Vendors have been very responsive during the start up.
f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority may report doc..doc
Ridley Expansion: The wet well have been removed. The demolition of the sludge room has been completed. Worth and Company has completed the demolition of equipment on the two tanks. They are installing the new piping in the tanks. The new walls in the sludge room are going up.
Township personal removed the Roto mat and pumps from the wet well and Eq. tank, I have contacted several of our vendors to let them know this equipment is for sale.
The Transducers and mag meters were removed, these can be used at our pumping stations.
Pa One Calls: We received 74 PA One calls for the Month of May.
Alarms: 12 alarms for the month of May.
f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority may report doc..doc
2008 FLOWMETERS
2010 MAY 2ND QUARTER
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY 1000 GPD | ELLIS LANE READING | ELLIS LANE 10 GPD | PAOLI PIKE READING | PAOLI PIKE 10 GPD | WILSON DRIVE READING | WILSON DRIVE 10 GPD | SUMMIT GPD | NET FLOWS |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 05/01/10 | 20,400 | 0 | ||||||||
| 0.5 | 05/02/10 | 20,400 | 0 | ||||||||
| 1.27 | 05/03/10 | 1,637,576 | 1,365,000 | 13,650,449 | 155,845 | 7,604,043 | 86,305 | 8,821,754 | 48,173 | 20,400 | 1,074,678 |
| 0 | 05/04/10 | 1,639,137 | 1,561,000 | 13,669,172 | 187,230 | 7,614,181 | 101,380 | 8,828,374 | 66,200 | 20,400 | 1,206,190 |
| 0 | 05/05/10 | 20,400 | 0 | ||||||||
| 0 | 05/06/10 | 1,641,994 | 1,428,500 | 13,701,297 | 160,625 | 7,632,070 | 89,445 | 8,842,359 | 69,925 | 20,400 | 1,108,505 |
| 0 | 05/07/10 | 20,400 | 0 | ||||||||
| 0 | 05/08/10 | 20,400 | 0 | ||||||||
| 0 | 05/09/10 | 20,400 | 0 | ||||||||
| 0 | 05/10/10 | 1,647,200 | 1,301,500 | 13,760,188 | 147,228 | 7,666,053 | 84,958 | 8,863,096 | 51,843 | 20,400 | 1,017,473 |
| 0 | 05/11/10 | 1,648,477 | 1,277,000 | 13,774,429 | 142,410 | 7,673,858 | 78,050 | 8,868,381 | 52,850 | 20,400 | 1,003,690 |
| 0.12 | 05/12/10 | 1,649,827 | 1,350,000 | 13,789,542 | 151,130 | 7,682,816 | 89,580 | 8,874,263 | 58,820 | 20,400 | 1,050,470 |
| 0 | 05/13/10 | 1,651,142 | 1,315,000 | 13,804,675 | 151,330 | 7,691,429 | 86,130 | 8,880,242 | 59,790 | 20,400 | 1,017,750 |
| 0 | 05/14/10 | 1,652,427 | 1,285,000 | 13,818,874 | 141,990 | 7,699,986 | 85,570 | 8,886,221 | 59,790 | 20,400 | 997,650 |
| 0 | 05/15/10 | 20,400 | 0 | ||||||||
| 0 | 05/16/10 | 20,400 | 0 | ||||||||
| 0.68 | 05/17/10 | 1,656,224 | 1,265,667 | 13,861,072 | 140,660 | 7,725,670 | 85,613 | 8,897,503 | 37,607 | 20,400 | 1,001,787 |
| 0.44 | 05/18/10 | 1,657,496 | 1,272,000 | 13,874,556 | 134,840 | 7,734,377 | 87,070 | 8,901,962 | 44,590 | 20,400 | 1,005,500 |
| 0 | 05/19/10 | 1,658,901 | 1,405,000 | 13,890,777 | 162,210 | 7,743,659 | 92,820 | 8,907,004 | 50,420 | 20,400 | 1,099,550 |
| 0 | 05/20/10 | 1,660,179 | 1,278,000 | 13,904,889 | 141,120 | 7,752,152 | 84,930 | 8,912,375 | 53,710 | 20,400 | 998,240 |
| 0 | 05/21/10 | 1,661,477 | 1,298,000 | 13,918,426 | 135,370 | 7,760,648 | 84,960 | 8,917,854 | 54,790 | 20,400 | 1,022,880 |
| 0.3 | 05/22/10 | 20,400 | 0 | ||||||||
| 0.8 | 05/23/10 | 20,400 | 0 | ||||||||
| 0 | 05/24/10 | 1,665,149 | 1,224,000 | 13,958,382 | 133,187 | 7,786,365 | 85,723 | 8,928,987 | 37,110 | 20,400 | 967,980 |
| 0 | 05/25/10 | 1,666,361 | 1,212,000 | 13,970,960 | 125,780 | 7,794,548 | 81,830 | 8,934,214 | 52,270 | 20,400 | 952,120 |
| 0 | 05/26/10 | 1,667,695 | 1,334,000 | 13,984,905 | 139,450 | 7,803,525 | 89,770 | 8,940,097 | 58,830 | 20,400 | 1,045,950 |
| 0.62 | 05/27/10 | 1,668,961 | 1,266,000 | 13,998,534 | 136,290 | 7,812,134 | 86,090 | 8,945,860 | 57,630 | 20,400 | 985,990 |
| 0 | 05/28/10 | 1,670,241 | 1,280,000 | 14,012,114 | 135,800 | 7,820,823 | 86,890 | 8,952,833 | 69,730 | 20,400 | 987,580 |
| 0.15 | 05/29/10 | 20,400 | 0 | ||||||||
| 0 | 05/30/10 | 20,400 | 0 | ||||||||
| 0.00 | 05/31/10 | 20,400 | 0 | ||||||||
| 4.88 | 1,317,648 | 145,694 | 87,062 | 54,671 | 20,400 | 1,030,221 |
DAILY LOC INQUIRER EG TWP
MONTH TO DATE NORMAL MONTH TO DATE YEAR TO DATE NORMAL YEAR TO DATE (DL)
f: Data/Shared Data/Public Works/flowmeters/2010 flowmeters -all-stations separate month worksheets.xls
6/4/20101:36 PM
2008 FLOWMETERS
2010 MAY 2ND QUARTER
| HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | SHERMAN | BARKWAY | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10 | 100 | 10 | 10 | 10 | 10 | |||||||
| DATE | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 05/01/10 | ||||||||||||
| 05/02/10 | ||||||||||||
| 05/03/10 | 18,831,810 | 69,463 | 825,065 | 100,250 | 8,654,586 | 327,363 | 94,663,285 | 852,253 | 346,402 | 5,838 | 1,513,841 | 12,300 |
| 05/04/10 | 18,839,071 | 72,610 | 826,163 | 109,800 | 8,696,011 | 414,250 | 94,755,899 | 926,140 | 347,155 | 7,530 | 1,514,909 | 10,680 |
| 05/05/10 | ||||||||||||
| 05/06/10 | 18,852,437 | 66,830 | 828,127 | 98,200 | 8,772,248 | 381,185 | 94,938,409 | 912,550 | 348,337 | 5,910 | 1,517,181 | 11,360 |
| 05/07/10 | ||||||||||||
| 05/08/10 | ||||||||||||
| 05/09/10 | ||||||||||||
| 05/10/10 | 18,878,165 | 64,320 | 831,759 | 90,800 | 8,901,031 | 321,958 | 95,264,438 | 815,073 | 350,347 | 5,025 | 1,521,942 | 11,903 |
| 05/11/10 | 18,884,423 | 62,580 | 832,610 | 85,100 | 8,935,729 | 346,980 | 95,346,068 | 816,300 | 350,839 | 4,920 | 1,523,053 | 11,110 |
| 05/12/10 | 18,890,717 | 62,940 | 833,504 | 89,400 | 8,972,410 | 366,810 | 95,432,342 | 862,740 | 351,402 | 5,630 | 1,524,266 | 12,130 |
| 05/13/10 | 18,897,104 | 63,870 | 834,375 | 87,100 | 9,008,551 | 361,410 | 95,516,892 | 845,500 | 352,001 | 5,990 | 1,525,315 | 10,490 |
| 05/14/10 | 18,903,453 | 63,490 | 835,234 | 85,900 | 9,043,905 | 353,540 | 95,599,143 | 822,510 | 352,584 | 5,830 | 1,526,480 | 11,650 |
| 05/15/10 | ||||||||||||
| 05/16/10 | ||||||||||||
| 05/17/10 | 18,922,809 | 64,520 | 837,836 | 86,733 | 9,131,785 | 292,933 | 95,830,874 | 772,437 | 354,387 | 6,010 | 1,529,785 | 11,017 |
| 05/18/10 | 18,929,169 | 63,600 | 838,654 | 81,800 | 9,166,700 | 349,150 | 95,912,179 | 813,050 | 354,965 | 5,780 | 1,530,863 | 10,780 |
| 05/19/10 | 18,935,721 | 65,520 | 839,593 | 93,900 | 9,204,546 | 378,460 | 96,002,534 | 903,550 | 355,575 | 6,100 | 1,532,015 | 11,520 |
| 05/20/10 | 18,941,783 | 60,620 | 840,417 | 82,400 | 9,241,680 | 371,340 | 96,086,927 | 843,930 | 356,130 | 5,550 | 1,533,190 | 11,750 |
| 05/21/10 | 18,946,854 | 50,710 | 841,231 | 81,400 | 9,278,098 | 364,180 | 96,169,718 | 827,910 | 356,644 | 5,140 | 1,534,382 | 11,920 |
| 05/22/10 | ||||||||||||
| 05/23/10 | ||||||||||||
| 05/24/10 | 18,967,260 | 68,020 | 843,622 | 79,700 | 9,367,977 | 299,597 | 96,395,409 | 752,303 | 358,243 | 5,330 | 1,537,696 | 11,047 |
| 05/25/10 | 18,973,260 | 60,000 | 844,356 | 73,400 | 9,402,628 | 346,510 | 96,472,921 | 775,120 | 358,838 | 5,950 | 1,538,710 | 10,140 |
| 05/26/10 | 18,979,616 | 63,560 | 845,192 | 83,600 | 9,439,988 | 373,600 | 96,558,715 | 857,940 | 359,427 | 5,890 | 1,539,932 | 12,220 |
| 05/27/10 | 18,985,764 | 61,480 | 845,944 | 75,200 | 9,476,847 | 368,590 | 96,641,397 | 826,820 | 359,988 | 5,610 | 1,540,961 | 10,290 |
| 05/28/10 | 18,991,807 | 60,430 | 846,731 | 78,700 | 9,514,828 | 379,810 | 96,724,596 | 831,990 | 360,629 | 6,410 | 1,541,976 | 10,150 |
| 05/29/10 | ||||||||||||
| 05/30/10 | ||||||||||||
| 05/31/10 | ||||||||||||
| 63,587 | 86,855 | 355,426 | 836,562 | 5,802 | 11,248 | |||||||
f: Data/Shared Data/Public Works/flowmeters/2010 flowmeters -all-stations separate month worksheets.xls 6/4/20101:33 PM
2010 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,425,517 | 123,265 | 81,325 | 63,991 | 20,400 | 83,711 | 103,900 | 363,921 | 882,367 | 5,627 | 13,543 |
| FEBRUARY | 1,462,759 | 132,866 | 74,793 | 70,879 | 20,400 | 77,500 | 103,327 | 332,371 | 906,362 | 5,456 | 13,156 |
| MARCH | 1,603,009 | 170,328 | 75,607 | 63,240 | 20,400 | 102,840 | 146,865 | 404,526 | 1,071,132 | 5,071 | 19,213 |
| APRIL | 1,545,846 | 174,279 | 89,043 | 67,148 | 20,400 | 85,455 | 126,703 | 386,665 | 991,262 | 5,303 | 13,956 |
| MAY | 1,317,648 | 145,694 | 87,062 | 54,671 | 20,400 | 63,587 | 86,855 | 355,426 | 836,562 | 5,802 | 11,248 |
| JUNE | |||||||||||
| JULY | |||||||||||
| AUGUST | |||||||||||
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,470,956 | 149,286 | 81,566 | 63,986 | 20,400 | 82,619 | 113,530 | 368,582 | 937,537 | 5,452 | 14,223 |
To
West Goshen 1,176,118
2010 flowmeters-all-stations separate month worksheets.xlsSUMMARY
May Precip. 4.88 - 2010
May
Precip.
6 5 4 3 2 1 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Snow/rain
Monthly Totals 2010 (Jan-Dec)
Monthly Totals
Precip.
9 8 7 6 5 4 3 2 1 0
1 2 3 4 5 6 7 8 9 10 11 12
Month
Flowmeters May 2010
May
Flow#s
1400000 1200000 1000000 800000 600000 400000 200000 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Day of the Month
Monthly Totals 2010 Jan-Dec
Flowmeters
2500000 2000000 1500000 1000000 500000 0
January February March April May June July August September October November December
Month
610-692-7171
www.eastgoshen.org
FYI
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
May 20, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Mr. Benjamin Mudry, 1137 N. Chester Rd., has applied for a Zoning Variance requesting relief from the zoning ordinance. Mr. Mudry is requesting dimensional relief from the side yard setback requirements of the ordinance; §240-9-G. The applicant proposes to construct a 330 square foot deck that will encroach 6 feet into the required 20' side yard setback area.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.
This application is scheduled to be discussed during the meetings outlined below:
June 2, 2010 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm)
June 15, 2010 – Board of Supervisors meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)
June 30, 2010 – Zoning Hearing Board (meeting @ 7:30 pm) (Zoning Hearing)
All meetings and hearings are held at the Township Building and are open to the public. This application and all associated information are available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-2\53-2-32 (1137 N Chester)\Variance 2010\1000 foot ZV ltr 05202010.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
May 25, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Liberty Towers, LLC has applied for a Zoning Variance requesting relief from the zoning ordinance. The applicant is requesting that the Zoning Hearing Board grant relief to allow a Wireless Communications Facility use in the C-2 Zoning District, and for dimensional relief from the rear yard setback requirements. If granted the relief the applicant proposes to construct a 150 foot tall Wireless Communications tower behind the Wawa store at 1594 Paoli Pike.
The applicant requests relief from the following sections of the Township Zoning Ordinance: §240-15.B and §240-15.G.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.
This application is scheduled to be discussed during the meetings outlined below:
June 2, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
July 6, 2010 - Board of Supervisors meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)
July 15, 2010 - Zoning Hearing Board (meeting @ 7:30 pm) (Zoning Hearing)
All meetings are held at the Township Building and are open to the public and are subject to change. The variance application is available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Boards and Commissions
Richard J. Lemanowicz, Esq. (Via Email and First Class Mail)
F:\Data\Shared Data\Property Management\53-4\53-4-80.01 (1594 Paoli Pike)\Liberty towers Var App May 2010\1000 foot ltr ZV 05252010.doc