Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

June 14, 2010
Monday, 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE Ask if anyone will be taping the meeting?
  2. RIDLEY CREEK REPORTS Brickhouse Environmental -; Pennoni –; Costs Summary; Change Orders; Worth & Company, Inc.,; Tank Cleaning Bid
  3. RIDLEY CREEK INVOICES a. Hammond & McCloskey, #4513, 5/5/10 $ 1,078.38 b. Hammond & McCloskey, #4523, 5/5/10 $ 270.10 c. Pennoni, #440011, 5/25/10 $ 19,287.50 d. Fisher Scientific, #3461600, 4/26/10 $ 2,329.17 e. Fisher Scientific, #3781979, 5/12/10 $ 1,485.63 f. Aqua Wastewater Mgt, #161112, 5/15/10 $ 39,937.70 g. USA BlueBook, #155755, 5/21/10 $ 456.81 h. Gawthrop Greenwood, #79963, 5/31/10 $ 665.00 i. Gawthrop Greenwood, #79964, 5/31/10 $ 836.00 j. Marco, #064873, 4/29/10 $ 258.00 k. Worth and Company, #P28001, 5/31/10 $178,290.62
  4. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  5. APPROVAL OF MINUTES May 10, 2010; May 20, 2010; June 7, 2010
  6. ENGINEER’S REPORT Pennoni report
  7. APPROVAL OF INVOICES a. General Fund reimbursement, Staples, 5/20/10 $ 142.47 b. Gawthrop Greenwood, #79415, 4/30/10 $ 627.00 c. Gawthrop Greenwood, #79416, 4/30/10 $ 1,083.00
  8. LIAISON REPORTS
  9. FINANCIAL REPORTS
  10. GOALS
  11. OLD BUSINESS Chester Creek Sewage Collection System Modeling
  12. NEW BUSINESS Memo – Ridley Creek Sewer Plant Project Outstanding Issues

Monday, June 14, 2010

- 1 -

  1. CAPACITY REQUESTS
  2. SEWER REPORTS Director of Public Works Report – May 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports; Artesian Ridley Creek Report
  3. ANY OTHER MATTER
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Delivery date
August 11, 2010 October 1, 2010
November 10, 2010 January 1, 2011

Monday, June 14, 2010

- 2 -

2 RIDLEY CREEK RPTS
b.
8 pgs

Project Manager’s May 2010 Report

Executive Summary

Commencement of phase II of the Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project progressed with the completion cleaning of the existing DAVCO treatment tanks. Aqua Wastewater Management, Inc. was contracted to remove and dispose of the sludge, grit and debris remaining in the treatment tanks after transfer of mixed liquor suspended solids (MLSS) to the new sequential batch reactors (SBRs). Demolition of existing main components included the removal of all lift station and forward flow EQ tank pumps, demolition of the previous influent lift station, clarifier drive mechanisms and related equipment, aeration tank drop piping and diffusers and the up flow sand filters. Refurbishment of the existing DAVCO treatment tanks to serve as treated effluent flow equalization and sludge holding tanks was initiated. Progress during May and the first week of June included complete refurbishment of DAVCO treatment tank number one (1) and initiation of the sand blasting and painting. Substantial progress was completed towards the installation of the underground piping linking the SBR effluent piping to the existing DAVCO tanks. The new sludge dewatering building concrete floor was cast in place and the construction of the masonry walls commenced on June 10th.

Operation of the SBRs and related equipment continued during the month. The manufacturer, Siemens, continued to coordinate with the Plant Operator to implement adjustments to the treatment plant system program and programmable logic controller (PLC). Regulatory compliance with the existing NPDES discharge permit for the month of May is not expected as the result of slightly elevated ammonia as nitrogen concentrations in the effluent. Improvements towards nitrification and ammonia as N removal are anticipated as the treatment process and programmable set points are adjusted for actual site conditions.

Key administrative and contractual items completed during the month included the acceptance and approval of Worth & Company change orders 001, 002, and 003 by the Municipal Authority. Included as part of the change orders, the overall substantial completion date was extended from June 30, 2010 to July 13, 2010. The Authority received a response from Pennoni Associates, Inc. regarding the Clinger letters dated March 15, 2010 and April 30, 2010. A meeting with representatives from Clinger and Pennoni was scheduled for June 11, 2010 to develop a solution for presentation to the Authority.

2 of 8

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

To: East Goshen Municipal Authority Members

From: Scott A. Towler, P.E., Project Manager
Dave W. Evans, Project Manager

CC: Evans Andrews, P.E., Authority Engineer

Date: June 10, 2010

Re: May 2010 – Project Manager Report for the Ridley Creek Capital Expansion Project:

I. General Construction

  1. Influent Meter Vault All work has been completed and the influent flow meter was placed in service May 5, 2010.
  2. Influent Lift Station All work has been completed and the influent flow meter was placed in service May 5, 2010.
  3. Manhole Number 1 No change in status
  4. Storm Water Bio Retention Pond Adjacent to Manhole No. 1 No change in status
  5. Screening Building The screening building, grinder and fine screen were placed in service May 5, 2010.; Relocation of the transfer fan approximately 3 vertical feet remains to be completed to prevent the fan from submergence in the event of flooding of the lower section of the screen building.; Accumulation of grit and debris has been observed in the open channel prior to the grinder. The channel was cleaned on June 8, 2010 and will be monitored. Presently, removal of the grit and debris will require manual labor with appropriate safety precautions.
  6. Influent Force Main to SBRs No new activity.

Page 1 of 7

3 of 8

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

  1. SBR Effluent Discharge & Disc Filter Feed Suction Piping On May 27, 2010, Trinity Excavation Company (TEC) installed the underground fourteen (14) inch piping from the existing control building to DAVCO No. 1.; Trinity Excavation Company (TEC) installed the fourteen (14) inch disc filter feed pump suction piping from the existing control building to the each of the existing DAVCO treatment tanks.; On June 8, 2010, TEC excavated the trench for the installation of the sixteen (16) inch ductile iron pipe from the SBRs to the existing DAVCO treatment tank number two (2).; Pressure testing of the disc filter feed suction piping is scheduled for the week of June 14, 2010.
  2. Flocculation Tank Two (2) remaining section of FRP require installation adjacent to the floc mixer.; Adjustment of the FRP decking parallel to the new treatment building remains to be completed.
  3. Disc Filters and Associated Equipment All work has been completed and the disc filters were placed in service May 5, 2010.; On June 7, 2010, Aqua Aerobics completed the replacement of all four (4) back wash valves on both disc filters. The work was performed as warranty work.; The Aqua Aerobics representative lowered the high level mounting bracket and float. The previous elevation setting allowed for the water level in the tank to rise and flow through the filter bypass without prompting for backwashing the disc filters. The water quality has improved.; Water has been observed to be present in the back wash pump oil reservoir sight glass for disc filter number 1. The manufacturer has been notified of the issue and to correct the problem.
  4. SBR Basins All work has been completed and three (3) of the four (4) SBRs were placed in service May 5, 2010.; On May 24, 2010, EGTMA Staff transferred MLSS from SBR No. 2 to SBR No. 3 to drain SBR No. 2. The objective was to perform an inspection of SBR No. 2 as part of investigating the discharge of MLSS from SBR No. 2 during a decant cycle. No malfunction was observed.; SBR Process Adjustments were implement as per Siemens: May 28, 2010 The air slope was increased to from 180 to 220.; May 28, 2010 The air slope was increased to from 180 to 220.; The air slope was increased to from 180 to 220.

Page 2 of 7

488

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

  1. The anoxic multiplier was reduced from 1.0 to 0.8.
  1. June 2, 2010 The anoxic multiplier was reduced from 0.8 to 0.7.
  2. June 4, 2010 The anoxic fill time was reduced from 70 minutes to 60 minutes.; The WAS setting was increased from 3.0 to 3.5 minutes.
  3. June 7, 2010 The maximum anoxic time was reduced from 60 minutes to 50 minutes.
  4. June 9, 2010 The air slope was increased from 220 to 230.; The minimum aeration time was increased from 90 to 120 minutes.
  1. SBR Equipment Pennoni Associates provided Wm. H. Clinger wiring diagrams and guidance for the termination of the motor operated valves included as part of the aluminum sulfate chemical feed system to the individual SBRs.
  2. Treatment Building On June 9, 2010, the concrete apron for the overhead garage door was cast in place.
  3. Treatment Building Roof No new activity
  4. UV Disinfection System All work has been completed and the disc filters were placed in service May 5, 2010.; A loose wire was determined to correct the previous problem identified with UV bank No. 1. Both UV banks were placed in service on May 28, 2010 to ensure adequate disinfection during a SBR decant cycle.; Continuous monitoring of the effluent water temperature at the discharge side of the UV lamps is ongoing.
  5. Effluent Collection Box No new activity.
  6. Effluent Overflow Box No new activity.

Page 3 of 7

5 of 8

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

  1. Utility Water Piping The non-potable water system was placed in service.; The Authority Staff furnished and installed wall mounted hose reels, including hose within the Screen and New Treatment Buildings.
  2. Apple Brook Discharge No new activity.; The pump is anticipated to be returned to service with when one effluent flow equalization basin is placed in service (possibly the end of June 2010).
  3. Electrical Clinger had no scheduled Staff or employees on site during May.; Matt Burke was dispatched to RCSTP on May 28, 2010 to address issues with the influent lift station and floc tank mixer. Both issues were resolved and the equipment returned to service.; Wm. H. Clinger Corporation work crews are scheduled to return to the site on June 21, 2010. Clinger estimates four (4) weeks to complete the electrical equipment installation.
  4. Rehabilitation of the existing Aeration Blowers Blower number 4 was delivered and installed.
  5. New Sludge Dewatering Building On May 24, 2010, TEC began excavation of the foundation for the new sludge dewatering building.; On May 25, 2010, Heim Contractors were on site preparing the forms for the building cast-in-place footers.; On June 1, 2010, Heim Contractors is on site placing the block for the dewatering building foundation. The work was completed on June 1 st .; On June 2, 2010, the three courses of concrete block for the foundation were filled with concrete. Two (2) cylinders were collected for testing.
  6. DAVCO Tank Cleaning & Refurbishment On May 6, 2010, Aqua wastewater Management, Inc. began cleaning DAVCO treatment tanks number two (2).; On May 10, 2010, DAVCO treatment tank number two (2) was cleaned of liquid waste. The clarifier section was completely cleaned. The aeration tank section contained grit which was being removed.; On May 14, 2010, Aqua Wastewater Management completed cleaning, removal and disposal of the contents in both DAVCO treatment plants.; On May 24, 2010, installation of the fourteen (14) and sixteen (16) inch pipe flanges on the exterior of the tanks on DAVCO No. 1 were

Page 4 of 7

6 of 8

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

completed. The openings in the wall between the aeration and sludge tanks to join the tanks together were cut in place.

  1. On May 27, 2010, installation of the fourteen (14) and sixteen (16) inch pipe flanges on the exterior of the tanks on DAVCO No. 2were completed.
  2. On June 2, 2010, the drain lines from the clarifier which transect the former aeration section of the DAVCO tanks was replaced and welded in place for both DAVCO tanks.
  3. On June 2, 2010, DAVCO tank No. 1 is ready for sandblasting and painting.
  4. On June 2, 2010, observation of the waste activated sludge pipe flanges for both DAVCO tanks were welded in place.
  1. Demolition Demolitions of the influent lift station commenced on May 8, 2010. The influent pumps, motors and grinder were removed. Observations on May 10, 2010 included removal of all piping, valves and the door and frame.; On May 24, 2010, the lift station was observed to have been backfilled and leveled.; On May 20, 2010, demolition of DAVCO treatment tank clarifier number one (1) was completed. The pipe penetrations through the clarifier walls were sealed with steel plates welded to cover the openings.; On May 24, 2010, the removal of the aeration drop pipes and diffusers was completed in DAVCO NO. 1.; On May 24, 2010, the removal of the aeration drop pipes and diffusers was completed in DAVCO NO. 2.; On May 27, 2010, the Parkson up flow sand filters were removed for disposal.; On June 2, 2010, demolition of the forward flow pumps, piping and concrete equipment pads was completed.
  2. Erosion and Sediment Controls East Goshen Township Municipal Authority Worth & Company, Inc. continues to perform inspections of the E&S controls as required after a storm event.

II. Payment Requests

  1. Worth & Company pencil payment review was conducted on June 3, 2010. Worth & Company was instructed to include information regarding the approved change orders on the request for payment application.
  2. There was no payment request review conducted for Wm. H. Clinger Corporation.

Page 5 of 7

7 of 8

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

III. Release of Liens

  1. Release of liens for equipment and subcontractors for Worth & Company are current.
  2. Copies of the release of liens for equipment and subcontractors for Wm. H. Clinger Corporation have been requested. The release of liens for equipment and subcontractors for Wm. H. Clinger Corporation are reported to be current.

IV. Meetings

  1. On May 13, 2010, the weekly progress meeting was conducted at the RCSTP site.
  2. On May 10, 2010, the East Goshen Township Municipal Authority conducted its monthly meeting.
  3. On May 19, 2010, prepared for and attended a meeting with Worth & Company and the East Goshen Township Municipal Authority to discuss proposed Worth & Company change orders 1 and 2. Change order number 1 was resolved and change order number 3 presented to Worth and Company.
  4. On May 20, 2010, the East Goshen Township Municipal Authority conducted a special meeting to discuss and approve Worth and Company PCO-19, PCO-20, PCO-21, PCO-22 and add eleven (11) days to the schedule.
  5. On May 27, 2010, the weekly progress meeting was conducted at the RCSTP site.

V. Correspondence

No formal letters were issued during the month

VI. Extras Identified During the month

  1. Worth & Company provided the Municipal Authority the executed change order number 001. There was a result of a credit to the Authority of $42,648.25 which resulted in an adjusted contract value of $7,822,751.75
  2. The East Goshen Township Municipal Authority approved change order 002 for Worth & Company. There was a result of a credit to Worth & Company of $11,234.03 which resulted in an adjusted contract value of $7,833,985.78.
  3. The East Goshen Township Municipal Authority approved change order 003 for Worth & Company. There was a result of a credit to Worth & Company of $35,438.56 which resulted in an adjusted contract value of $7,869,424.24.

Page 6 of 7

8 of 8

East Goshen Municipal Authority
Ridley Creek Sewage Treatment Plant Upgrade & Expansion Project
May 2010 Project Manager Report

Potential Receipts Pending

  1. Worth & Company credit for the reduced labor and schedule regarding the installation of the frost barrier within the internal perimeter of the new treatment building.
  2. Discussion of the cost benefits to Worth & Company regarding the BFP and construction of a temporary structure are recommended.

VII. Issues for Reconciliation

  1. Aqua Aerobics disc filter control panel was observed to produce a “basin transducer level out of range” alarm. Worth & Company is coordinating with Aqua Aerobics to correct the deficiency.
  2. Siemens SBR Operational issues regarding low dissolved oxygen concentrations. The Plant Operator is coordinating with Siemens to adjust the process. Influent wastewater monitoring and process control testing will assist in resolving the problem.
  3. Pennoni Associates, Inc. formal letter response to East Goshen Township Municipal Authority regarding Clinger’s March 15, 2010 letter.
  4. Clinger issued a letter dated April 30, 2010 to the East Goshen Township Municipal Authority explaining that they are proceeding with the installation of the conduit within the duct bank between the existing control building and new treatment plant. They also claim their position that the work is not included as part of the original plans as prepared by Pennoni Associates, Inc.
  5. Worth & Company issued a letter dated February 15, 2010 requesting for a substantial completion date of September 30, 2010.
  6. Worth and Company change orders for the structural steel modifications to the new treatment and screening buildings.

VIII. Concerns to Monitor

  1. Grit and debris accumulation in the influent flow channel prior to the grinder and screening unit.
  2. Performance of the SBR treatment process, specifically dissolved oxygen concentrations, aeration time, organic loadings and process control.
  3. Alkalinity feed system.
  4. Separation of the internal recycles flow volumes from the influent flow meter for accurate determination of the influent flows.

IX. Start-up

No dates have been established for the treated effluent storage, sludge holding, disc filter feed pumps or centrifuge dewatering system start up and training.

Page 7 of 7

2. RIDLEY CREEK RPTS
C.
8 pgs
SUMMARY V2

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY

June 9, 2010

Includes bills paid at 5/10 and 5/20 meetings

Name Budget or
Contract amt.
This Month To Date Balance % of work
completed
EXPENSES
Borrowing costs $52,250.00 $0.00 $52,250.00 $0.00 100.00%
Worth $7,865,400.00 $170,263.75 $6,235,671.75 $1,629,728.25 79.28%
    change orders -$7,332.91 $0.00 $0.00 -$7,332.91 0.00%
Clinger $974,000.00 $34,539.38 $837,199.44 $136,800.56 85.95%
    change orders $31,862.00 $0.00 $0.00 $31,862.00 0.00%
Pennoni (Inspection) (05) $136,200.00 $0.00 $136,197.62 $2.38 100.00%
Pennoni (Continued Services) (10) $99,700.00 $19,243.40 $91,817.98 $7,882.02 92.09%
Pennoni (Rechargeable) (06) $20,000.00 $0.00 $12,961.75 $7,038.25 64.81%
Brickhouse $175,000.00 $11,931.25 $102,637.50 $72,362.50 58.65%
Extras
    Capital $87,224.91 $0.00 $47,461.42 $39,763.49 54.41%
    Capital (Identified but not paid) $73,696.00 $0.00 $0.00 $73,696.00 0.00%
    Trailer, Phone, Porta Pot & Internet $12,000.00 $711.15 $10,509.95 $1,490.05 87.58%
EXPENSES TOTAL $9,520,000.00 $236,688.93 $7,526,707.41 $1,993,292.59 79.06%
RECEIPTS
Pennoni (Rechargeable) -$20,000.00 $0.00 $0.00 -$20,000.00 0.00%
NET $9,500,000.00 $236,688.93 $7,526,707.41 $1,973,292.59

Retainage (10% until 50% of the project is done then it drops back to 5%)

Worth $328,193.25 5%
Clinger $42,245.28 5%
Total $370,438.53

We have identified $146,357 in potential extras.
We also have $464,195 in Grant Money available

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

2 of 8

DETAIL

EAST GOSHEN MUNICIPAL AUTHORITY

RIDLEY CREEK CAPITAL EXPANSION PROJECT

DETAIL

June 9, 2010

Category Date Amount Subtotals Name Description
Worth 2/9/2009 $561,150.00 Worth & Company Application #1
3/9/2009 $480,825.00 Worth & Company Application #2
4/9/2009 $768,780.00 Worth & Company Application #3
5/8/2009 $125,352.90 Worth & Company Application #4
5/31/2009 $485,103.12 Worth & Company Application #5
6/30/2009 $267,975.00 Worth & Company Application #6
7/31/2009 $138,217.50 Worth & Company Application #7
8/31/2009 $679,793.40 Worth & Company Application #8
9/30/2009 $504,310.98 Worth & Company Application #9
9/30/2009 $222,861.55 Worth & Company Application #10 (5% retainage)
10/31/2009 $724,089.05 Worth & Company Application #11
11/30/2009 $379,360.17 Worth & Company Application # 12
12/31/2009 $374,772.62 Worth & Company Application #13
1/31/2010 $207,881.86 Worth & Company Application # 14
2/28/2010 $69,077.35 Worth & Company Application # 15
3/31/2010 $75,857.50 Worth & Company Application # 16
4/30/2010 $170,263.75 Worth & Company Application # 17
$6,235,671.75 $6,235,671.75
Clinger 4/9/2009 $22,152.64 Clinger Application #1
5/8/2009 $15,714.77 Clinger Application #2
5/31/2009 $77,973.43 Clinger Application #3
6/30/2009 $12,567.46 Clinger Application #4
8/30/2009 $10,855.98 Clinger Application #5
9/30/2009 $111,255.75 Clinger Application #6
10/31/2009 $59,344.83 Clinger Application #7
11/30/2009 $145,354.05 Clinger Application # 8
12/31/2009 $94,727.00 Clinger Application # 9
1/31/2010 $139,092.94 Clinger Application #10
2/28/2010 $58,514.64 Clinger Application #11
2/28/2010 $41,530.78 Clinger Application #12 (5% retainage)
$13,575.79 Clinger Application #13
5/2/2010 $34,539.38 Clinger Application # 14
$837,199.44 $837,199.44
Pennoni ? $712.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU ?
10/30/2008 $943.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 10/19/08
12/5/2008 $18,115.98 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 11/30/08

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

3 of 8

Date Amount Subtotals Name Description
1/15/2009 $12,929.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 12/28/08
2/5/2009 $13,352.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009 $31,288.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009 $29,010.46 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009 $22,436.46 PENNONI ASSOCIATES INC. RCSTP EXP. PROJ. SERV. THRU 4/26/09
7/29/2009 $3,528.00 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 7/19/09
12/30/2010 $16,482.50 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 12/31/10
1/29/2010 $24,224.58 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 1/17/10
2/23/2010 $13,057.00 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 2/14/10
4/1/2010 $19,243.40 PENNONI ASSOCIATES INC.
5/5/2010 $18,810.50 PENNONI ASSOCIATES INC. Through 4/18/2010
$224,134.38 $224,134.38
Pennoni (rechargeable)
2/5/2009 $2,840.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009 $4,934.75 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009 $3,777.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009 $1,409.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 4/26/09
$12,961.75 $12,961.75
Brickhouse
5/12/2009 $2,127.50 BRICKHOUSE Apr-09
6/1/2009 $8,452.50 BRICKHOUSE May-09
7/1/2009 $7,791.25 BRICKHOUSE Jun-09
8/3/2009 $9,315.00 BRICKHOUSE Jul-09
9/1/2009 $7,762.50 BRICKHOUSE Aug-09
10/1/2009 $7,417.50 BRICKHOUSE Sep-09
11/2/2009 $7,072.50 BRICKHOUSE Oct-09
12/1/2009 $7,963.75 BRICKHOUSE Nov-09
1/4/2010 $7,762.50 BRICKHOUSE Dec-09
2/1/2010 $7,618.75 BRICKHOUSE Jan-10
3/1/2010 $7,417.50 BRICKHOUSE Feb-10
4/1/2010 $10,005.00 BRICKHOUSE Mar-10
5/3/2010 $11,931.25 BRICKHOUSE Apr-10
$102,637.50 $102,637.50
Extras - Capital - Paid
12/22/2008 $44.98 EAST GOSHEN TOWNSHIP REIMBURSE GEN.FUND FOR OFFICE DEPOT
12/31/2008 $88.00 FASTSIGNS RED ON WHITE ALUM. SIGNS
1/12/2009 $177.00 FASTSIGNS SIGNS - PLEASE AVOID TOWNE DR....
12/1/2008 $36.00 GREAT VALLEY LOCKSHOP KEYS FOR CONTRACTOR
12/8/2008 $160.80 GREAT VALLEY LOCKSHOP PADLOCKS, REKEY CYLINDERS & KEYS
12/29/2008 $474.82 HANSON AGGREGATES INC 36.95 TONS SUBBASE AGGREGATE
12/31/2008 $908.00 HANSON AGGREGATES INC 70.66 TONS SUBGRADE 2 AGGREGATE
12/15/2008 $2,089.39 LENNI ELECTRIC CORPORAT TEMP SERV. FOR TRAILER - RIDLEY CRK
12/31/2008 $120.00 LENNI ELECTRIC CORPORAT SEWER PLANT - GUY WIRE RELOCATE
12/29/2008 $7,865.00 MACANGA INC. TRUCK & TRACKHOE RENTAL 12/5-12/18

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

4 of 8

Date Amount Subtotals Name Description
12/1/2008 $2,466.00 PATTERSON, MICHAEL J. MATERIALS & LABOR - SPLIT RAIL FENCE
12/1/2008 $4,907.72 PIPE XPRESS INC. COPPER TUBING, BRASS COMP. COUPLING
12/15/2008 $813.74 PIPE XPRESS INC. BURIAL HYDRANT, BRASS CURB STOP, &
12/29/2008 $129.00 RAM-T CORPORATION 2 FT. SILT FENCE
12/1/2008 $1,183.00 RANSOME RENTAL COMPAN CATERPILLAR - TRUCK LOADER RENTAL
12/8/2008 $3,960.00 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 11/13-11/25/08
12/29/2008 $908.00 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 12/15 - 12/18/08
12/31/2008 $1,044.85 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 12/15-12/16/08
12/8/2008 $119.95 SAFETY SOLUTIONS INC. MEDICAL SUPPLIES
12/1/2008 $635.60 US MUNICIPAL SUPPLY INC. CUSTOM SIGNS - RIDLEY CREEK TREATMT
12/31/2008 $157.50 GAWTHROP GREENWOOD LEGAL
1/31/2009 $936.50 GAWTHROP GREENWOOD LEGAL
3/19/2009 $1,246.64 HAMMOND & MCCMLOSY WATER SERVICE
3/31/2009 $1,254.00 GAWTHROP GREENWOOD LEGAL
4/2/2009 $274.21 PIPE XPRESS INC. YARD HYDRANT #2
4/2/2009 $1,910.28 HAMMOND & MCCMLOSY WATER PIPING
5/11/2009 $158.69 US MUNICIPAL SUPPLY INC. 3 SIGNS
4/30/2009 $264.86 LENNI ELECTRIC CORPORAT WIRED HOT WATER HEATER
5/31/2009 $133.00 GAWTHROP GREENWOOD LEGAL
6/30/2009 $304.00 GAWTHROP GREENWOOD LEGAL
7/17/2009 $1,481.00 EAST GOSHEN TOWNSHIP BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE)
9/10/2009 $254.85 AGWAY TREE STAKES AND PEAT MOSS
8/25/2009 $1,855.00 HARMONY HILL NURSERIES 16 TREES
8/31/2009 $836.00 GAWTHROP GREENWOOD 2 MONTH LEGAL
11/19/2009 $314.00 VIMCO SEALER FOR FLOORS
10/31/2009 $285.00 GAWTHROP GREENWOOD LEGAL
12/31/2010 $1,414.97 L/B water YARD HYDRANT #2
12/18/2009 $443.48 Grainger Hose Reel 1 inch
12/18/2009 $267.98 Grainger Hose Reel 3/4 inch
2/2/2010 $789.45 Fisher Scientific Lab Equipment
2/28/2010 $57.00 GAWTHROP GREENWOOD LEGAL
3/15/2010 $103.96 Matthews Ford Van rental
3/31/2010 $275.50 Grainger Hose
3/31/2010 $247.00 GAWTHROP GREENWOOD LEGAL
4/7/2010 $70.15 GREAT VALLEY LOCKSHOP 6 locks
4/14/2010 $641.98 Grainger Shelving
4/15/2010 $1,127.48 Continetal Fire & Safety 3" & 1.75" Hose
4/16/2010 $28.58 Grainger Phone
3/17/2010 $1,092.01 Water Pollution Biology Michael Geradi - Talk
2/22/2010 $1,104.50 McNichols Safety Grating
5/5/2010 HAMMOND & MCCMLOSY WATER LINE OFFICE
5/5/2010 HAMMOND & MCCMLOSY Hose fitting in storage room
4/26/2010 Fisher Scientific BALANCE
4/29/2010 Fisher Scientific COD HEATING BLOCK
5/3/2010 Fisher Scientific DESICCATOR & OVEN
5/12/2010 Fisher Scientific FURNACE

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

5 of 8

Date Amount Subtotals Name Description
4/19/2010 Grainger pump and hose
5/21/2010 USA Blue book beakers
4/29/2010 Marco 3 10Lb dry Chem FX
4/26/2010 Cleaners Pro shop cleaniong equiipment
5/9/2010 Staples offcie equipment
4/30/2010 GAWTHROP GREENWOOD Legal
Total $47,461.42 $47,461.42
Extras - Capital - Identified capital extras that have not been paid
$20,396.00 Driveway Restoration
$3,300.00 Restoration of parking area
$50,000.00 Paving at RCSTP (we received a credit from Worth)
Total $73,696.00 $73,696.00
Trailer, Phone, Porta Potty & Internet
12/15/2008 $1,039.10 ACTON MOBILE INDUSTRIES RENTAL MOBILE OFFICE
12/22/2008 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - THRU 1/19/09
1/21/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 1/20-2/20/09
2/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 2/20- 3/20/09
3/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 3/20 - 4/19
4/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 4/20 - 5/19
5/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFCIE RENTAL 5-20 - 6/19
6/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFCIE RENTAL 6/20 - 7/19
7/10/2009 $239.10 ACTON MOBILE INDUSTRIES 7/20 to 8/19
8/10/2009 $239.10 ACTON MOBILE INDUSTRIES 8/20/to
9/10/2009 $239.10 ACTON MOBILE INDUSTRIES
10/10/2009 $239.10 ACTON MOBILE INDUSTRIES thru 11/19
11/10/2009 $239.10 ACTON MOBILE INDUSTRIES thru 12/19
12/10/2009 $239.10 ACTON MOBILE INDUSTRIES Thru 1/19
1/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 2/19/10
2/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 3/19/10
3/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 4/19
4/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 5/19
5/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 6/19
$5,342.90 $5,342.90
12/15/2008 $140.00 POTTY QUEEN RENTAL PORTABLE TOILET - RIDLEY CRK
12/22/2008 $64.47 POTTY QUEEN RENTAL TOILET 12/23-1/10/08
2/8/2009 $95.00 POTTY QUEEN RENTAL TOILET 2/8-3/7
3/8/2009 $95.00 POTTY QUEEN RENTAL TOILET 3/8-4/4
4/5/2009 $95.00 POTTY QUEEN RENTAL TOILET 4/5-5/2
5/5/2009 $95.00 POTTY QUEEN RENTAL TOILET ????
7/26/2009 $95.00 POTTY QUEEN RENTAL 7/26 TO 8/22
8/23/2009 $95.00 POTTY QUEEN Rental 8/23 to 9/19
9/20/2009 $95.00 POTTY QUEEN RENTAL 9/20 to 10/17

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

6 of 8

Date Amount Subtotals Name Description
10/18/2009 $95.00 POTTY QUEEN 10/18/09 to 11/14/09
11/14/2009 $95.00 POTTY QUEEN 11/15 to 12/13
12/13/2009 $95.00 POTTY QUEEN 12/13 to 1/9/10
1/10/2010 $95.00 POTTY QUEEN 1/10/10 to 2/6/10
2/7/2010 $95.00 POTTY QUEEN 2/7/10 to 3/6/10
3/7/2010 $95.00 POTTY QUEEN 3/7 to 4/3
4/4/2010 $95.00 POTTY QUEEN 4/4 to 5/1
5/2/2010 $98.80 POTTY QUEEN 5/2 to 5/29
5/30/2010 $96.90 POTTY QUEEN 5/30 to 6/26
$1,730.17 $1,730.17
12/22/2008 $174.65 VERIZON -7041 NOVEMBER 25 - DECEMBER 6, 2008
1/7/2009 $137.87 VERIZON -7041 BILLING DATE 1/07/09
2/7/2009 $130.34 VERIZON -7041 BILLING DATE 2/07/09
3/7/2009 $133.97 VERIZON -7041 BILLING DATE 3/7/09
4/7/2009 $136.00 VERIZON -7041 BILLING DATE 4/7/09
5/7/2009 $137.66 VERIZON -7041 BILLING DATE 5/7/09
6/7/2009 $178.47 VERIZON -7041 BILLINGDATE 6/7/2009
7/7/2009 $145.21 VERIZON -7041 Billing Date 7/7/09
8/7/2009 $134.44 VERIZON -7041 Billing Date 8/7/09
9/7/2009 $132.93 VERIZON -7041 billing date 9/7/09
10/7/2009 $133.43 VERIZON -7041 Billing date 10/7/09
11/7/2009 $133.79 VERIZON -7041 Billing Date 11/7/09
12/7/2009 $136.76 VERIZON -7041 Billing date 12/7/09
1/7/2010 $135.11 VERIZON -7041 Billing date 1/7/10
2/7/2010 $134.35 VERIZON -7041 Billing date 2/7/10
3/7/2010 $134.34 VERIZON -7041 Billing date 3/7/10
4/7/2010 $134.72 VERIZON -7041 Billing date 4/7/10
5/7/2010 $136.37 VERIZON -7041 billing ddate 5/7/2010
$2,520.41 $2,520.41
8/31/2009 $286.56 VERIZON INTERNET (FIRST BILL)
9/28/2009 $69.99 VERIZON INTERNET
10/28/2009 $69.99 VERIZON INTERNET
11/28/2009 $69.99 VERIZON INTERNET
12/28/2009 $69.99 VERIZON INTERNET
1/28/2010 $69.99 VERIZON INTERNET
2/28/2010 $69.99 VERIZON INTERNET
3/28/2010 $69.99 VERIZON INTERNET
4/28/2010 $69.99 VERIZON INTERNET
5/28/2010 $69.99 VERIZON INTERNET
$916.47 $916.47
Trailer, Phone, Porta Potty & Internet Total $10,509.95

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

7 of 8

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS

June 9, 2010

Potential capital extras
Pipe conduit Conflicts $30,000
Controls $10,000
Sludge room retrofit $10,000
HVAC Thermostats $5,000
Cathode Protection $10,000
Treatment Tanks $50,000
Electrician (increase in wages) $20,000
UV Channel $11,357
Total potential extras $146,357 $146,357
Potential Receipts
H2O Grant Money $464,195
Total Potential Receipts $464,195 $464,195

POTENTIAL EXTRAS

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

8 of 8

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS

June 9, 2010

NO. AMOUNT APPROVED WORK STATUS PAID
WORTH
1 $3,209.70 2/24/09 BLOWER #1 REPAIR APPROVED NO
4 $5,542.80 5/11/09 BLOWER #2 REPAIR APPROVED NO
? $4,617.08 ???? BLOWER #3 REPAIR APPROVED NO
3 $2,703.00 12/14/09 ANTI-FLOT COLLAR APPROVED NO
5 $6,784.65 12/14/09 LARGER MIXER FOR FLOC TANK APPROVED NO
15 $4,494.52 12/14/09 REMOVABLE RAILS ON SBR TANK APPROVED NO
17 $6,126.78 3/8/10 BLOWER #4 REPAIR APPROVED NO
8 -$6,250.00 3/8/10 CREDIT FOR CAST IRON PIPE APPROVED NO
-$20,000.00 2/8/10 Credit for Electric Wages APPROVED NO
9 -$50,000.00 2/8/10 Credit for paving APPROVED NO
19 $27,702.20 5/20/10 air drops APPROVED NO
20 $3,516.77 5/20/10 2 doors APPROVED NO
21 $18,094.59 5/20/10 walkways APPROVED NO
22 -$13,875.00 5/20/10 Credit for concrete APPROVED NO
Total -$7,332.91
CLINGER
Denied EXTEND 34 KV LINES DENIED
1 $5,106.00 7/1/09 CORNER UNIT FOR MCC APPROVED NO
2 $23,585.00 SERVICE DISCONNECT APPROVED NO
3 $3,171.00 4/12/10 Applebrook Pump APPROVED NO
Total $31,862.00

CHANGE ORDERS

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 060910.xls

3. RIDLEY CREEK INV
25509

COPY

HAMMOND & MC CLOSKEY, INC.
PLUMBING & HEATING
1 CANNON HILL DRIVE
WEST CHESTER, PA 19382

Phone #: 610-793-0411

Invoice

Date Invoice #
5/5/2010 4513

APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: 0742-7452

Billing Address:

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Relocate water Line

Job Address:

East Goshen Township
Ridley Creek Sewer Treatment Plant
West Chester, PA 19380

Telephone #: P.O. No. Terms:
610-692-7171 Due on receipt
Description Amount
4/28/10 - Rerouted main water line in office area. Installed new hose faucet outside office door.
1 - 1" TecTite coupling 23.87
1 - 3/4" TecTite coupling 11.32
50' - 1" CPVC pipe 83.50
10' - 3/4" CPVC pipe 8.20
8 - 1" CPVC ells 26.24
4 - 1" CPVC couplings 11.28
1 - 1" x 3/4" CPVC tee 4.21
6 - 2-1/8" unistrut pipe clamps 137.88
1 - 1" CxC ball valve 19.60
1 - 3/4" CxC ball valve 12.05
1 - 3/4" CxF drop ear ell 14.79
1 - 3/4" hose bibb 12.90
2 - 3/4" CxC ells 45 degrees 15.40
1" CxC 90 degree ell 13.30
30' - 1-1/8" pipe insulation 59.40
10' - 3/4" type-L copper tubing 48.60
2 - 3/4" CxC ells 90 degrees 10.84
misc. shop supplies (glue, anchors, solder, etc) 15.00
5.5 HRS. @ $100 HR. 550.00
Total $1,078.38

Thank you! We appreciate the opportunity to serve you and the confidence you have placed in us.

TERMS: NET DUE UPON RECEIPT; $25 charge for checks returned NSF; $20 charge to transfer accounts to Transworld Systems for collection.

25509

COPY

HAMMOND & MC CLOSKEY, INC.
PLUMBING & HEATING
1 CANNON HILL DRIVE
WEST CHESTER, PA 19382

Phone #: 610-793-0411

Invoice

Date Invoice #
5/5/2010 4523

APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: 0742-7452

Billing Address:

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Press RM

Job Address:

East Goshen Township
Ridley Creek Sewer Treatment Plant
West Chester, PA 19380

Telephone #: P.O. No. Terms:
610-692-7171 Due on receipt
Description Amount
5/5/10 - Installed hose fitting in storage room. Ran hose to sludge room and tied into PVC water line for press.
2 HRS. @ $100 HR. 200.00
1 - 3/4" hose faucet 11.30
1 - 3/4" x 1/2" x 1/2" brass tee 9.90
1 - 1/2" brass nipple 11.10
1 - 1" PVC S/40 tee 2.10
1 - 1" PVC S/40 "M" adapter 1.97
1 - 1" x 3/4" brass reducing coupling 14.10
1 - 1/2" x 3/4" CxM adapter 8.14
1' - 1/2" type "L" copper tubing 3.10
2 - S/S gear clamps 4.90
1 - 4' clothes washer hose 3.49
Total $270.10

We appreciate your business and look forward to serving you again.

TERMS: NET DUE UPON RECEIPT; $25 charge for checks returned NSF; $20 charge to transfer accounts to Transworld Systems for collection.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 440011
Invoice Date : 05/25/2010
Project : EGMA0707
Project Name : RCSTP Expansion

For Services Rendered through: 05/16/2010

Construction meetings with contractors and Township; construction management; shop drawing and schedule review; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting control problems with UV system, effluent weir plate, and SBR #3 overload; responses to Contractor RFIs; schedule reviews; and review/negotiations of change orders with Township and contractors.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Permit Design est. $111,400.00 $111,385.00 $111,385.00 $0.00
02 -- Permitting est. $14,200.00 $14,184.00 $14,184.00 $0.00
03 -- Final Design est. $226,700.00 $226,655.50 $226,655.50 $0.00
04 -- Bidding est. $14,500.00 $14,446.50 $14,446.50 $0.00
05 -- Construction est. $136,200.00 $136,197.62 $136,197.62 $0.00
06 -- Additional Submittals est. $20,000.00 $19,997.18 $19,997.18 $0.00
10 -- Continued Construction Services est. $121,700.00 $91,817.98 $111,105.48 $19,287.50
Total : $644,700.00 $614,683.78 $633,971.28 $19,287.50

Amount Due This Invoice $19,287.50

ok RS
6-2-10

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA0707 Invoice Summary

Invoice Date 05-25-2010

Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 440011
Invoice Period: 4/19/2010 to 5/16/2010
Initial Authorization: $ 465,000.00 Date: 8/14/2007
Changes: $ - Date: 2/5/2009
Changes: $ 58,000.00 Date: 5/11/2009
Changes: $ 99,700.00 Date: 1/11/2010
Changes: $ 22,000.00 Date: 5/10/2010
Contract Amount: $ 644,700.00
Previously Invoiced: $ 614,683.78
Current Invoice: $ 19,287.50
Invoiced to Date ($): $ 633,971.28
Invoiced to Date (%): 98%
Remaining Budget ($): $ 10,728.72
Remaining Budget (%): 2%

Budget by Phase:

Phase No. 05 06 10
Phase Name: Construction Additional Engineering Continued Eng Svcs
Phase Budget: $ 88,200.00 $ 10,000.00 $ 99,700.00
Changes: $ 48,000.00 $ 10,000.00 $ 22,000.00
Contract Amount: $ 136,200.00 $ 20,000.00 $ 121,700.00
Previously Invoiced: $ 136,197.62 $ 16,469.18 $ 91,817.98
Current Invoice: $ - $ 3,528.00 $ 19,287.50
Invoiced to Date ($): $ 136,197.62 $ 19,997.18 $ 111,105.48
Invoiced to Date (%): 100% 100% 91%
Remaining Budget ($): $ 2.38 $ 2.82 $ 10,594.52
Remaining Budget (%): 0% 0% 11%

Comments: Phase 10 - Continued Engineering Services
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; and site observation of construction. Consultation with Township regarding same.

Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting problems with UV system, effluent weir plate and SBR #3 overload; responses to Contractor RFIs; schedule reviews; tracking pressure test failure; and review/negotiations of change orders with Township and contractors.

Invoiced effort does not include effort related to responding to the Electrical Contractor's letter of 3/15/2010.

East Goshen Municipal Authority

EGMA0707 Invoice Summary

Invoice Date 05-25-2010

Effort by Labor Category under Phase 10:

Category Previous Hrs. Current Total Hrs.
Authority Engineer 72.75 23.00 95.75
Senior Engineer 259.50 25.00 284.50
Senior Designer 98.00 30.00 128.00
Project Engineer 49.00 35.00 84.00
Associate Engineer 7.00 0.00 7.00
Graduate Engineer 43.00 0.00 43.00
Project Representative/Inspector 2.50 0.00 2.50
Technical Specialist (McAloon) 541.00 115.50 656.50
Engineering Technician I 13.50 0.00 13.50
Administrative Assistant I 0.50 0.00 0.50
Totals 862.75 228.50 1315.25

Budget/Schedule Status (November to June):

Schedule % = 88%
Budget % = 91%

Fisher Scientific

Part of Thermo Fisher Scientific

REMIT TO: ACCT# 026655-001 P.O. BOX 3648 BOSTON MA 02241-3648

INQUIRE AT: (800) 766-7000 4500 TURNBERRY DRIVE HANOVER PARK IL 60133

D-U-N-S-00-432-1519 FEIN 23-2942737 ORIGINAL INVOICE

PLEASE REFER TO THIS INVOICE NUMBER ON YOUR REMITTANCE: 3461600

COPY

CUSTOMER PURCHASE ORDER NUMBER - RELEASE NUMBER INV. DATE ORDER NO. ACCOUNT NO. CSO F.O.B. ORDER ENTRY DATE PAGE DUPLICATE
RIDLEY CREEK SEWAGE TREATMENT PLANT 05/03/2010 H01161270 026655-001 CHI SHIPPING POINT 04/26/2010 1

SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

SHIP TO: MARK MILLER EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

INVOICE TYPE: NOR FON CON

THIS IS A PARTIAL [X] SHIPMENT

DUE: 06/02/2010 TERMS: NET 30 DAYS FROM INVOICE DATE. PAYABLE IN U.S. CURRENCY.

APPROVED BY: [illegible] DATE PAID: CHECK #: CHARGED TO: 07424-7452

Visit: www.fishersci.com

DESCRIPTION CATALOG NUMBER QUANTITY SHIPPED UNIT PRICE AMOUNT
CALLER-MARK MILLER PHONE-610-692-7171
SHIPMENT NBR: 003 FROM: MWD ON: 05/03/2010
DESICCATOR PASOLINA W/O HANDLE 08 647 44 1 EA 366.29 366.29
SHIPMENT NBR: 004 FROM: VND ON: 05/01/2010
PRECISION PRE MECH OV 2.5 120V 11 475 138 1 EA 1,883.90 1,883.90
MERCHANDISE SUBTOTAL 2,250.19
SHIPPING 8.34
DIRECT SHIPMENT CHARGE 70.64
TOTAL INVOICE AMOUNT 2,329.17

FOR YOUR PROTECTION, OUR COMPANY DOES NOT ACCEPT CREDIT CARD NUMBERS VIA FAX OR EMAIL

TELL US ABOUT YOUR RECENT CUSTOMER SERVICE EXPERIENCE BY COMPLETING A SHORT SURVEY. THIS SHOULD TAKE NO LONGER THAN THREE MINUTES. ENTER THE LINK INTO YOUR INTO YOUR BROWSER AND ENTER THE PASSCODE SHOWN. http://survey.medallia.com/fishersci PASSCODE: USA-PGH-CS1

PLEASE USE REMIT TO ADDRESS ABOVE AND INCLUDE DEPT. NBR.

See reverse side for complete terms and conditions or visit http://www.fishersci.com/wps/portal/CMSTATIC?href=Footer/tandcsale.jsp

PAST DUE BALANCES ARE SUBJECT TO A FINANCE CHARGE. THIS SHIPMENT WAS DELIVERED IN PERFECT CONDITION AND SIGNED FOR BY THE TRANSPORTATION COMPANY. CONSIGNORS RESPONSIBILITY CEASES UPON DELIVERY OF GOODS TO CARRIER. DO NOT ACCEPT SHIPMENT SHOWING EVIDENCE OF DAMAGE OR SHORTAGE UNTIL AGENT OF CARRIER ENDORSES NOTATION TO THIS EFFECT ON FACE OF TRANSPORTATION RECEIPT. WITHOUT THIS DOCUMENTARY EVIDENCE CLAIM CANNOT BE FILED. SELLER CERTIFIES THAT ALL GOODS (OR SERVICES) COVERED BY THIS INVOICE WERE PRODUCED IN COMPLIANCE WITH ALL APPLICABLE REQUIREMENTS OF SECTIONS 6, 7, AND 12 OF THE FAIR LABOR STANDARDS ACTS OF 1938, AS AMENDED, AND OF THE REGULATIONS AND ORDERS OF THE UNITED STATES DEPARTMENT OF LABOR ISSUED UNDER SECTION 14 THEREOF. NO CREDIT WILL BE ALLOWED FOR MERCHANDISE RETURNED WITHOUT PRIOR AUTHORIZATION.

THE PRICES SHOWN ON THIS INVOICE ARE NET OF DISCOUNTS PROVIDED AT THE TIME OF PURCHASE. SOME PRODUCTS MAY BE SUBJECT TO ADDITIONAL DISCOUNTS AGREED UPON BETWEEN THE PARTIES.

Fisher Scientific

Part of Thermo Fisher Scientific

REMIT TO: ACCT# 026655-001 P.O. BOX 3648 BOSTON MA 02241-3648

INQUIRE AT: (800) 766-7000 4500 TURNBERRY DRIVE HANOVER PARK IL 60133

D-U-N-S-00-432-1519 FEIN 23-2942737 ORIGINAL INVOICE

PLEASE REFER TO THIS INVOICE NUMBER ON YOUR REMITTANCE: 3781979

COPY

CUSTOMER PURCHASE ORDER NUMBER - RELEASE NUMBER INV. DATE ORDER NO. ACCOUNT NO. CSO F.O.B. ORDER ENTRY DATE PAGE DUPLICATE
RIDLEY CREEK SEWAGE TREATMENT PLANT 05/12/2010 H01161270 026655-001 CHI SHIPPING POINT 04/26/2010 1

SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

RECEIVED BY: MAY 17 2010

SHIP TO: MARK MILLER EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

INVOICE TYPE: NOR FON CON

THIS IS A PARTIAL [ ] SHIPMENT

DUE: 06/11/2010 TERMS: NET 30 DAYS FROM INVOICE DATE. PAYABLE IN U.S. CURRENCY.

Visit: www.fishersci.com

DESCRIPTION CATALOG NUMBER QUANTITY SHIPPED UNIT PRICE AMOUNT
CALLER-MARK MILLER PHONE-610-692-7171
SHIPMENT NBR: 005 FROM: VND ON: 05/11/2010
BT MUFFLE FURN MAN 120V50/60HZ 10 554 5 1 EA 1,401.54 1,401.54
MERCHANDISE SUBTOTAL 1,401.54
DIRECT SHIPMENT CHARGE 84.09
TOTAL INVOICE AMOUNT 1,485.63

FOR YOUR PROTECTION, OUR COMPANY DOES NOT ACCEPT CREDIT CARD NUMBERS VIA FAX OR EMAIL

TELL US ABOUT YOUR RECENT CUSTOMER SERVICE EXPERIENCE BY COMPLETING A SHORT SURVEY. THIS SHOULD TAKE NO LONGER THAN THREE MINUTES. ENTER THE LINK INTO YOUR INTO YOUR BROWSER AND ENTER THE PASSCODE SHOWN. http://survey.medallia.com/fishersci PASSCODE: USA-PGH-CS1

PLEASE USE REMIT TO ADDRESS ABOVE AND INCLUDE DEPT. NBR.

APPROVED BY: [illegible] DATE PAID: CHECK #: CHARGED TO: 07424-7452 Lab Equip.

See reverse side for complete terms and conditions or visit http://www.fishersci.com/wps/portal/CMSTATIC?href=Footer/tandcsale.jsp

PAST DUE BALANCES ARE SUBJECT TO A FINANCE CHARGE. THIS SHIPMENT WAS DELIVERED IN PERFECT CONDITION AND SIGNED FOR BY THE TRANSPORTATION COMPANY. CONSIGNORS RESPONSIBILITY CEASES UPON DELIVERY OF GOODS TO CARRIER. DO NOT ACCEPT SHIPMENT SHOWING EVIDENCE OF DAMAGE OR SHORTAGE UNTIL AGENT OF CARRIER ENDORSES NOTATION TO THIS EFFECT ON FACE OF TRANSPORTATION RECEIPT. WITHOUT THIS DOCUMENTARY EVIDENCE CLAIM CANNOT BE FILED. SELLER CERTIFIES THAT ALL GOODS (OR SERVICES) COVERED BY THIS INVOICE WERE PRODUCED IN COMPLIANCE WITH ALL APPLICABLE REQUIREMENTS OF SECTIONS 6, 7, AND 12 OF THE FAIR LABOR STANDARDS ACTS OF 1938, AS AMENDED, AND OF THE REGULATIONS AND ORDERS OF THE UNITED STATES DEPARTMENT OF LABOR ISSUED UNDER SECTION 14 THEREOF. NO CREDIT WILL BE ALLOWED FOR MERCHANDISE RETURNED WITHOUT PRIOR AUTHORIZATION.

THE PRICES SHOWN ON THIS INVOICE ARE NET OF DISCOUNTS PROVIDED AT THE TIME OF PURCHASE. SOME PRODUCTS MAY BE SUBJECT TO ADDITIONAL DISCOUNTS AGREED UPON BETWEEN THE PARTIES.

Aqua Wastewater Management, Inc.

PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205

Invoice

Number: 117366
Date: 28-May-2010
P.O. Number:
Job Description: 2-tank cleanings
Order Num: 161112
Serviced: 15-May-2010

BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

JOB SITE:
Ridley Creek STP
Town Drive & Line Road
West Chester, PA

Quantity ServiceType Amount Tax Warranty & Expiration Extension
1 Disposal Charges
TOTAL OF 54 TONS OF GRIT @ 96.00 A TON-SEE ATTACHED BREAKDOWN
$5,184.00 No 0 Days $5,184.00
1 Disposal Charges
TOTAL OF 153,100 GALLONS OF SLUDGE @ .227 A GALLON-SEE ATTACHED BREAKDOWN
$34,753.70 No 0 Days $34,753.70
Taxable Amount: $0.00 Tax Rate: 0 Tax: $0.00 Description: PA Tax Exempt Subtotal NonTaxed: $39,937.70
Subtotal Taxable: $0.00
Subtotal Tax: $0.00
Payment Terms: Net 30 Payment: $0.00 Adjustment: $0.00 Late Charge: $0.00 Please Pay: $39,937.70

PA State Homeowner Protection Act, Registration #PA022859

A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-7452

Please detach here and return the bottom portion with your payment.

From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Order No. Invoice No. Date Amount Due
161112 117366 28-May-2010 $39,937.70
Serviced 15-May-2010

To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552

[Handwritten note: ok to pay Mark/SMA 6/9/2010]

USABlueBook

INVOICE

Remit to: P.O. Box 9004 Gurnee, IL 60031-9004

TEL: (847) 689-9781 FAX: (847) 689-3001 TOLL FREE: 1-800-548-1234 F.E.I.N.: 52-2418852

2010 MAY 28 AM 11 03

INVOICE NO. PAGE NO. CUSTOMER NO. DATE
155755 1 of 1 796821 05/21/10

BILL TO: 796821 EAST GOSHEN TOWNSHIP PW DEPT 1580 PAOLI PIKE WEST CHESTER PA 19380 USA ATTN MARK MILLER

SHIP TO: SAME EAST GOSHEN TOWNSHIP PW DEPT 1580 PAOLI PIKE WEST CHESTER PA 19380 USA

RC

APPROVED BY: [illegible] DATE PAID: CHECK #: CHARGED TO: 07424-7452

CUSTOMER P.O. NO. SHIP DATE SLP TERMS TAX CODE SALES ORDER NO. W/H FREIGHT SHIP VIA
PER MARK 05/21/10 CHH NET 30 PAEXEMPT 795306 01 PREPAID UPS
USA STOCK NO. DESCRIPTION ORDERED SHIPPED BACK ORDER U/M PRICE PER EXTENSION
34860 Griffin Low Form Beaker 1000ml Polypropylene, Nalgene PK/3 4 4 0 PK 34.15 PK 136.60
41332 Nalgene Settleometer, Jar & Lid Only - No Accessories 3 3 0 EA 99.95 EA 299.85

APPROVED BY: DATE PAID: CHECK #: CHARGED TO:

THANK YOU for your business! 1.5% MONTHLY FINANCE CHARGE ON AMOUNTS 30 DAYS PAST DUE Discounts Apply to Merchandise Only

MERCHANDISE MISCELLANEOUS DISCOUNT TAX FREIGHT TOTAL
436.45 .00 .00 .00 20.36 456.81

Should it become necessary to refer your unpaid balance to a collection agency, a collection fee, not to exceed 25% of the balance referred; plus reasonable attorney's fees; and court costs when necessary, will be added to the balance due.

Please Detach and Return Bottom Portion to Insure Proper Credit to Your Account

****IMPORTANT**** Please include this customer # on the face of your remittance check.

CUSTOMER NO. INVOICE NO. DATE TOTAL
796821 155755 05/21/10 456.81

USABlueBook REMIT TO: USABlueBook, P.O. Box 9004, Gurnee, IL 60031-9004

[Handwritten top: MA]

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
05/31/2010
Client No: 6604-01M
Invoice No. 79963

General Authority Services

Fees

Date Description Hours Amount
05/10/2010
RFA
Review packet for 5/10/10 meeting of Authority; attend regular meeting of Authority. 3.50
For Current Services Rendered 3.50 665.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 3.50 $190.00 $665.00
Previous Balance $627.00
Total Current Charges 665.00
05/19/2010 Fee Payment -627.00
Balance Due $665.00

[Handwritten note next to Balance Due: 6/9/10 ok RS with circle around $665.00]

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
05/31/2010
Client No: 6604-06M
Invoice No. 79964

Ridley Creek Treatment Plant Upgrades/ Expansion

Fees

Date Description Hours Amount
05/12/2010
RFA
Review RCSTP contract regarding percentage payment issue and releases of liens; telephone conference with Rick Smith regarding contract provisions regarding payment to contractor. 1.00
05/13/2010
RFA
Review messages from Rick Smith regarding need for special meeting of Authority. 0.30
05/14/2010
RFA
Review message from Evan Andrews regarding special meeting of Authority; review message from Rick Smith regarding special meeting. 0.60
05/17/2010
RFA
Review letter from L. Smith to Clinger of 5/11/10. 0.30
05/19/2010
RFA
Review agenda for special meeting of Authority 5/20/10; telephone conference with Rick Smith regarding special meeting of Municipal Authority. 0.70
05/20/2010
RFA
Attend special meeting of Municipal Authority to act on Worth invoice and change orders. 1.20
05/21/2010
RFA
Review message from Mark Miller regarding Ridley Creek STP sludge room walls. 0.30
For Current Services Rendered 4.40 836.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 4.40 $190.00 $836.00

East Goshen Municipal Authority

Ridley Creek Treatment Plant Upgrades/ Expansion

Page: 2
05/31/2010
Client No: 6604-06M
Invoice No. 79964

Previous Balance $1,330.00
Total Current Charges 836.00
05/19/2010 Fee Payment -304.00
Balance Due $1,862.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

MARCO

MARCO INCORPORATED
320 Commerce Drive - Exton, PA. 19341
Phone 610/363-2233 Fax 610/363-2886
FIRE SUPPRESSION SPECIALISTS

THANK YOU

WE APPRECIATE YOUR BUSINESS

IF YOU HAVE A PROBLEM PLEASE CALL US AT 610/363-2233

SC Invoice

Invoice No. 064873
Date 04/29/2010
Order No. SC00062840
Contract No
Cust ID EAST1580
Page 1 of 1

BILL TO:
EAST GOSHEN TOWNSHIP
MARK S MILLER
1580 PAOLI PIKE
WEST CHESTER, PA 19380

SHIP TO:
EAST GOSHEN TOWNSHIP
MARK S MILLER
1580 PAOLI PIKE
WEST CHESTER, PA 19380 Ph (610) 692-8950

F.O.B. POINT SHIP VIA TERMS CUSTOMER P.O. NO. ORDERED BY SALES PER
Net 15 Days - MARK S MILLER 0904
ITEM NUMBER AND DESCRIPTION QTY SHIP UNITS PRICE EXT. PRICE
111MPX010131
10 LB. MP DRY CHEM PORT FX 4A:80B:C (ABC10-W STRIKE FIRST)
3.00 EACH 86.00 258.00

APPROVED BY: ____________
DATE PAID: ____________
CHECK #: ____________
CHARGED TO: 07424.7452

[Watermark: COPY]

1972 - 2010
38 YEARS OF EXCELLENCE

Contractor License Information

PA PA014526
Phila. 20674
DE FSL0111
MD MSC-184
NJ P00032
VA 2705-101354A

Please Remit To:
Marco Incorporated - 320 Comerce Drive Exton, Pa. 19341

Sales Total SalesTax TOTAL
258.00 .00 258.00

OUR FEDERAL ID NUMBER IS 23-1908247

A Service Charge of 1.5% ($ 1.00 min) per Month Will be Added to all Past Due Accounts.

To insure your account is credited Please put the invoice number on Your Check.

PLEASE PAY THIS INVOICE NO STATEMENT WILL BE SENT.

Service Call Invoice New SD640

Page 1

Application and Certificate For Payment

To Owner Project Application Info
East Goshen Municipal Authorit 1580 Paoli Pike West Chester, PA 19380 Ridley Creek WWTP 1751 Towne Road Fred Papiernik 267-278-6108 West Chester, PA 19380 Application No: 18 Date: 05/31/2010 Period To: 05/31/10
From (Contractor): Worth and Company, Inc. 6263 Kellers Church Road Pipersville, PA 18947 Phone: 267 362-1100 Contractor Job Number: P28001 Via (Architect): Contract For: Architect's Project No: Contract Date: 10/22/08

Contractor's Application For Payment

Change Order Summary Number Date Approved Additions Deductions
Change orders approved in previous months by owner
Change orders approved this month CO-001 05/31/10 -42,648.25
CO-002 05/31/10 11,234.03
CO-003 05/31/10 35,438.56
Totals 46,672.59 -42,648.25
Net change by change orders 4,024.34
Item Amount
Original contract sum 7,865,400.00
Net change by change orders 4,024.34
Contract sum to date 7,869,424.34
Total completed and stored to date 6,751,539.34
Retainage: 5.0% of completed work 337,576.97
Retainage: 0.0% of stored material 0.00
Total retainage 337,576.97
Total earned less retainage 6,413,962.37
Less previous certificates of payment 6,235,671.75
Current payment due 178,290.62
Balance to finish, including retainage 1,455,461.97

The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief the work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.

Contractor: By: Anne Bowman Date: 6/3/10

State of: PA County of: Bucks

Subscribed and sworn to before me this 3rd day of June 2010 (year), Notary public: Linda D Nelson

My commission expires [illegible]

COMMONWEALTH OF PENNSYLVANIA Notarial Seal Linda D. Nelson, Notary Public Plumstead Twp., Bucks County My Commission Expires Sept. 18, 2010 Member, Pennsylvania Association of Notaries

Architect's Certificate for Payment

In accordance with the Contract Documents, based on on-site observations and the data comprising the above application the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.

Amount Certified: $ 178,209.62

Architect: By: [illegible] Date: 6/10/10

This Certification is not negotiable. The Amount Certified is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

Application and Certificate For Payment -- page 2

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 18 Date: 05/31/10 Period To: 05/31/10

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
CO-001 Blower Repairs 3,209.70 0.00 3,209.70 0.00 3,209.70 100.00 0.00 160.49
CO-001A Anit Flotation Collar 2,703.00 0.00 2,703.00 0.00 2,703.00 100.00 0.00 135.15
CO-001B Blower 2 repairs 5,542.80 0.00 5,542.80 0.00 5,542.80 100.00 0.00 277.14
CO-001C Top Entry Mixer change 6,784.65 0.00 6,784.65 0.00 6,784.65 100.00 0.00 339.23
CO-001D SBR Handrail 4,494.52 0.00 4,494.52 0.00 4,494.52 100.00 0.00 224.73
CO-001E Blower 3 Repairs 4,617.08 0.00 4,617.08 0.00 4,617.08 100.00 0.00 230.85
CO-001F Paving Credit -50,000.00 0.00 -50,000.00 0.00 -50,000.00 100.00 0.00 -2,500.00
CO-001G SBR Wall Credit -20,000.00 0.00 -20,000.00 0.00 -20,000.00 100.00 0.00 -1,000.00
CO-002 PVC Credit Lieu of Cast Iron -6,250.00 0.00 -6,250.00 0.00 -6,250.00 100.00 0.00 -312.50
CO-002A Concrete Wall @ UV Channel 11,357.25 0.00 11,357.25 0.00 11,357.25 100.00 0.00 567.86
CO-002B Blower 4 Repairs 6,126.78 0.00 6,126.78 0.00 6,126.78 100.00 0.00 306.34
CO-003 (24) Air Drops 27,702.20 0.00 27,702.20 0.00 27,702.20 100.00 0.00 1,385.11
CO-003A New Doors 3,516.77 0.00 3,516.77 0.00 3,516.77 100.00 0.00 175.84
CO-003B Paint Digester Walkway 18,094.59 0.00 18,094.59 0.00 18,094.59 100.00 0.00 904.73
CO-003C Digester Concrete Credit -13,875.00 0.00 -13,875.00 0.00 -13,875.00 100.00 0.00 -693.75
Subtotal 4,024.34 0.00 4,024.34 0.00 4,024.34 100.00 0.00 201.22
G1-000 Site Work & Yard Piping
G1-001 Bonds 160,000.00 160,000.00 0.00 0.00 160,000.00 100.00 0.00 8,000.00
G1-002 Insurance 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 2,500.00
G1-003 Mobilization 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00 0.00 5,000.00
G1-004 Pre-Planning/Schedule 20,000.00 16,000.00 4,000.00 0.00 20,000.00 100.00 0.00 1,000.00
G1-005 Submittals - Dutchland 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 750.00
G1-006 Submittals - Jet Tech 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 750.00
G1-007 E & S Controls 25,000.00 15,000.00 0.00 0.00 15,000.00 60.00 10,000.00 750.00
G1-008 Strip Topsoil 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 2,500.00
G1-009 Temporary Seed 5,000.00 3,000.00 0.00 0.00 3,000.00 60.00 2,000.00 150.00

Application and Certificate For Payment -- page 3

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 18 Date: 05/31/10 Period To: 05/31/10

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G1-010 Bioretention Basin 1 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G1-011 Bioretention Basin 2 20,000.00 5,000.00 0.00 0.00 5,000.00 25.00 15,000.00 250.00
G1-012 Temporary Fence 9,000.00 6,300.00 0.00 0.00 6,300.00 70.00 2,700.00 315.00
G1-013 Influent Force Main 85,000.00 85,000.00 0.00 0.00 85,000.00 100.00 0.00 4,250.00
G1-014 Filter Feed Force Main 85,000.00 85,000.00 0.00 0.00 85,000.00 100.00 0.00 4,250.00
G1-015 Filter Effluent 55,000.00 55,000.00 0.00 0.00 55,000.00 100.00 0.00 2,750.00
G1-016 System Effluent 55,000.00 55,000.00 0.00 0.00 55,000.00 100.00 0.00 2,750.00
G1-017 Filter Feed Pump Suction 25,000.00 0.00 22,500.00 0.00 22,500.00 90.00 2,500.00 1,125.00
G1-018 Filter Feed Pump Discharge 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 1,250.00
G1-019 Flocculation Tank to Filters 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 2,500.00
G1-020 4" WAS 45,000.00 4,500.00 0.00 0.00 4,500.00 10.00 40,500.00 225.00
G1-021 Yard Drain 70,000.00 52,500.00 0.00 0.00 52,500.00 75.00 17,500.00 2,625.00
G1-022 Sludge Pump Suction 25,000.00 0.00 12,500.00 0.00 12,500.00 50.00 12,500.00 625.00
G1-023 Relocate Air Lines 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G1-024 Influent 45,000.00 45,000.00 0.00 0.00 45,000.00 100.00 0.00 2,250.00
G1-025 Utility Water 75,000.00 63,750.00 0.00 0.00 63,750.00 85.00 11,250.00 3,187.50
G1-026 Apple Brook Discharge 15,000.00 14,250.00 0.00 0.00 14,250.00 95.00 750.00 712.50
G1-027 PVC Chemical Carrier Pipe 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 1,250.00
G1-028 Potable Water 45,000.00 38,250.00 6,750.00 0.00 45,000.00 100.00 0.00 2,250.00
G1-029 8" Underdrain 40,000.00 30,000.00 0.00 0.00 30,000.00 75.00 10,000.00 1,500.00
G1-030 1" Compressed Air 15,000.00 3,750.00 11,250.00 0.00 15,000.00 100.00 0.00 750.00
G1-031 Sidewalks 15,000.00 0.00 0.00 0.00 0.00 0.00 15,000.00 0.00
G1-032 VOID
G1-033 VOID
G1-034 Block 1,000.00 1,000.00 0.00 0.00 1,000.00 100.00 0.00 50.00
G1-035 Chain Link Fence 30,000.00 0.00 0.00 0.00 0.00 0.00 30,000.00 0.00

Application and Certificate For Payment -- page 4

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 18 Date: 05/31/10 Period To: 05/31/10

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G1-036 Demo Existing Fence 10,000.00 5,000.00 0.00 0.00 5,000.00 50.00 5,000.00 250.00
Subtotal 1,345,000.00 1,073,300.00 57,000.00 0.00 1,130,300.00 84.04 214,700.00 56,515.00
G2-000 Pump Station & Valve Vault
G2-001 Excavate Pump Station 52,000.00 52,000.00 0.00 0.00 52,000.00 100.00 0.00 2,600.00
G2-002 Install Precast Pump Station 68,000.00 68,000.00 0.00 0.00 68,000.00 100.00 0.00 3,400.00
G2-003 Install Anti-Flotation Collar 3,500.00 3,500.00 0.00 0.00 3,500.00 100.00 0.00 175.00
G2-004 Backfill Pump Station 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 600.00
G2-005 Excavate Valve Vault 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 750.00
G2-006 Install Valve Vault 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00 0.00 1,400.00
G2-007 Backfill Valve Vault 7,500.00 7,500.00 0.00 0.00 7,500.00 100.00 0.00 375.00
G2-008 Painting 9,000.00 9,000.00 0.00 0.00 9,000.00 100.00 0.00 450.00
G2-009 Pipe/Valves/Fittings 15,000.00 14,250.00 750.00 0.00 15,000.00 100.00 0.00 750.00
G2-010 Influent Pumps 65,000.00 65,000.00 0.00 0.00 65,000.00 100.00 0.00 3,250.00
Subtotal 275,000.00 274,250.00 750.00 0.00 275,000.00 100.00 0.00 13,750.00
G3-000 Screen Building
G3-001 Excavate Screen Bldg; Elev 13' 38,000.00 38,000.00 0.00 0.00 38,000.00 100.00 0.00 1,900.00
G3-002 Stone Underslab 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 250.00
G3-003 Form/Pour 18" Thick Slab 39,000.00 39,000.00 0.00 0.00 39,000.00 100.00 0.00 1,950.00
G3-004 Form/Pour Exterior Walls 65,000.00 65,000.00 0.00 0.00 65,000.00 100.00 0.00 3,250.00
G3-005 Backfill 12,000.00 10,800.00 0.00 0.00 10,800.00 90.00 1,200.00 540.00
G3-006 Excavate Footers; Elev 2'8" 7,000.00 7,000.00 0.00 0.00 7,000.00 100.00 0.00 350.00
G3-007 Form/Pour Footers 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 600.00
G3-008 Install Masonry Frost Wall 9,000.00 9,000.00 0.00 0.00 9,000.00 100.00 0.00 450.00
G3-009 Pour Slab 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 400.00
G3-010 Form/Pour Channel Walls 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 2,500.00
G3-011 Install Exterior Masonry Walls 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 1,500.00

Application and Certificate For Payment -- page 5

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 18 Date: 05/31/10 Period To: 05/31/10

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G3-012 Structural Steel 3,000.00 3,000.00 0.00 0.00 3,000.00 100.00 0.00 150.00
G3-013 Misc Metals 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 400.00
G3-014 Rough Carpentry 24,000.00 24,000.00 0.00 0.00 24,000.00 100.00 0.00 1,200.00
G3-015 Dryvit 18,000.00 18,000.00 0.00 0.00 18,000.00 100.00 0.00 900.00
G3-016 FRP Grating 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00 0.00 200.00
G3-017 Hollow Metal & FRP Doors 1,500.00 1,500.00 0.00 0.00 1,500.00 100.00 0.00 75.00
G3-018 Overhead Doors 17,500.00 17,500.00 0.00 0.00 17,500.00 100.00 0.00 875.00
G3-019 Trolley & Hoist 2,000.00 2,000.00 0.00 0.00 2,000.00 100.00 0.00 100.00
G3-020 Plumbing 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 250.00
G3-021 HVAC 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 500.00
G3-022 Painting 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 600.00
Subtotal 380,000.00 378,800.00 0.00 0.00 378,800.00 99.68 1,200.00 18,940.00
G4-000 Grinder w/RotatingScreen&Auger
G4-001 Screen 180,000.00 180,000.00 0.00 0.00 180,000.00 100.00 0.00 9,000.00
Subtotal 180,000.00 180,000.00 0.00 0.00 180,000.00 100.00 0.00 9,000.00
G5-000 PrecastPost TensionedSBR Tanks
G5-001 Bulk Excavate SBR Structure 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00 0.00 5,000.00
G5-002 Stone Underslab-SBR Structure 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 1,500.00
G5-003 Concrete Base Slab for SBR 690,000.00 690,000.00 0.00 0.00 690,000.00 100.00 0.00 34,500.00
G5-004 Backfill Tank 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 1,000.00
G5-005 Walls & Walkways 750,000.00 750,000.00 0.00 0.00 750,000.00 100.00 0.00 37,500.00
G5-006 Misc Metals 60,000.00 57,000.00 0.00 0.00 57,000.00 95.00 3,000.00 2,850.00
Subtotal 1,650,000.00 1,647,000.00 0.00 0.00 1,647,000.00 99.82 3,000.00 82,350.00
G6-000 Treatment Building
G6-001 Excavate Footers 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00 0.00 2,000.00
G6-002 Pour Footers 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 750.00

Application and Certificate For Payment -- page 6

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18
Date: 05/31/10
Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
Previous Application This Period
G6-003 Pour Pier Footers 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 500.00
G6-004 Pour Piers 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 400.00
G6-005 Masonry Frost Walls 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 750.00
G6-006 Backfill 8,000.00 6,400.00 0.00 0.00 6,400.00 80.00 1,600.00 320.00
G6-007 Stone Under Slab 6,000.00 6,000.00 0.00 0.00 6,000.00 100.00 0.00 300.00
G6-008 Plumbing Under Slab 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 500.00
G6-009 Concrete Slab 18,000.00 17,100.00 0.00 0.00 17,100.00 95.00 900.00 855.00
G6-010 Precast Flocculation Tank 35,000.00 35,000.00 0.00 0.00 35,000.00 100.00 0.00 1,750.00
G6-011 Precast Effluent Storage Tank 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 1,000.00
G6-012 Poured In Place UV Channel 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 1,250.00
G6-013 Masonry 72,000.00 72,000.00 0.00 0.00 72,000.00 100.00 0.00 3,600.00
G6-014 Structural Steel & Deck 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00 0.00 1,400.00
G6-015 Misc Metals 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 1,250.00
G6-016 FRP Grating 10,000.00 7,500.00 0.00 0.00 7,500.00 75.00 2,500.00 375.00
G6-017 Dryvit 35,000.00 35,000.00 0.00 0.00 35,000.00 100.00 0.00 1,750.00
G6-018 EPDM Roofing 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00 0.00 2,000.00
G6-019 Caulking 5,000.00 2,500.00 2,500.00 0.00 5,000.00 100.00 0.00 250.00
G6-020 Hollow Metal & FRP Doors 2,500.00 2,250.00 0.00 0.00 2,250.00 90.00 250.00 112.50
G6-021 Overhead Doors 19,500.00 19,500.00 0.00 0.00 19,500.00 100.00 0.00 975.00
G6-022 Painting 35,000.00 31,500.00 0.00 0.00 31,500.00 90.00 3,500.00 1,575.00
G6-023 Top Entry Mixer 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 1,000.00
G6-024 Plumbing 23,000.00 23,000.00 0.00 0.00 23,000.00 100.00 0.00 1,150.00
G6-025 HVAC 50,000.00 40,000.00 7,500.00 0.00 47,500.00 95.00 2,500.00 2,375.00
Subtotal 575,000.00 553,750.00 10,000.00 0.00 563,750.00 98.04 11,250.00 28,187.50
G7-000 SBR/Chem Feed & Process Piping
G7-001 SBR Equipment 790,000.00 782,100.00 7,900.00 0.00 790,000.00 100.00 0.00 39,500.00

Application and Certificate For Payment -- page 7

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 18 Date: 05/31/10 Period To: 05/31/10

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G7-002 Polymer Feed System 18,000.00 9,000.00 0.00 0.00 9,000.00 50.00 9,000.00 450.00
G7-003 Chem Feed Pumps & Piping 18,000.00 16,200.00 0.00 0.00 16,200.00 90.00 1,800.00 810.00
G7-004 Inline Static Mixers 25,500.00 25,500.00 0.00 0.00 25,500.00 100.00 0.00 1,275.00
G7-005 Inline Grinder 8,500.00 0.00 0.00 0.00 0.00 0.00 8,500.00 0.00
G7-006 Utility Water Pumps & Controls 80,000.00 80,000.00 0.00 0.00 80,000.00 100.00 0.00 4,000.00
G7-007 Instrumentation & Controls 127,000.00 107,950.00 0.00 0.00 107,950.00 85.00 19,050.00 5,397.50
G7-008 FRP Chemical Tank 25,000.00 22,500.00 2,500.00 0.00 25,000.00 100.00 0.00 1,250.00
G7-009 Process Piping 245,000.00 232,750.00 0.00 0.00 232,750.00 95.00 12,250.00 11,637.50
G7-010 Relocated Apple Brook Pump 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 400.00
Subtotal 1,345,000.00 1,284,000.00 10,400.00 0.00 1,294,400.00 96.24 50,600.00 64,720.00
G8-000 Filtration & UV System
G8-001 Disk Filters 470,000.00 470,000.00 0.00 0.00 470,000.00 100.00 0.00 23,500.00
G8-002 Filter Feed Pumps 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
G8-003 UV System 180,000.00 180,000.00 0.00 0.00 180,000.00 100.00 0.00 9,000.00
Subtotal 660,000.00 650,000.00 0.00 0.00 650,000.00 98.48 10,000.00 32,500.00
G9-000 Sludge Digestion & Post EQTank
G9-001 Demo Interior 20,000.00 0.00 20,000.00 0.00 20,000.00 100.00 0.00 1,000.00
G9-002 Sandblasting & Painting 160,000.00 0.00 0.00 0.00 0.00 0.00 160,000.00 0.00
G9-003 Course Bubble Diffuser 30,000.00 25,550.00 0.00 0.00 25,550.00 85.17 4,450.00 1,277.50
G9-004 Centrifugal Blower Recondition 20,000.00 8,000.00 0.00 0.00 8,000.00 40.00 12,000.00 400.00
G9-005 Aeration Tank Rehabilitation 45,000.00 0.00 22,500.00 0.00 22,500.00 50.00 22,500.00 1,125.00
Subtotal 275,000.00 33,550.00 42,500.00 0.00 76,050.00 27.65 198,950.00 3,802.50
GG10-000 Sludge Dewatering BldgAddition
GG10-001 Demo Centrifuge 8,000.00 0.00 8,000.00 0.00 8,000.00 100.00 0.00 400.00
GG10-002 Demo Building 10,000.00 0.00 10,000.00 0.00 10,000.00 100.00 0.00 500.00
GG10-003 Sawcut Floor 8,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 0.00

Application and Certificate For Payment -- page 8

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 18 Date: 05/31/10 Period To: 05/31/10

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
GG10-004 Excavate Footers 12,000.00 0.00 12,000.00 0.00 12,000.00 100.00 0.00 600.00
GG10-005 Form & Pour Footers 8,000.00 0.00 8,000.00 0.00 8,000.00 100.00 0.00 400.00
GG10-006 Masonry Frost Walls 20,000.00 0.00 20,000.00 0.00 20,000.00 100.00 0.00 1,000.00
GG10-007 Backfill 6,000.00 0.00 0.00 0.00 0.00 0.00 6,000.00 0.00
GG10-008 Underslab Plumbing 5,000.00 0.00 5,000.00 0.00 5,000.00 100.00 0.00 250.00
GG10-009 Misc Metals 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
GG10-010 Pour Concrete Slab 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
GG10-011 Masonry Walls 35,000.00 0.00 0.00 0.00 0.00 0.00 35,000.00 0.00
GG10-012 Dryvit 25,000.00 0.00 0.00 0.00 0.00 0.00 25,000.00 0.00
GG10-013 Frames & Doors 1,500.00 0.00 0.00 0.00 0.00 0.00 1,500.00 0.00
GG10-014 Overhead Doors 6,000.00 0.00 0.00 0.00 0.00 0.00 6,000.00 0.00
GG10-015 Trolley & Hoist 4,000.00 0.00 0.00 0.00 0.00 0.00 4,000.00 0.00
GG10-016 Carpentry 39,000.00 0.00 0.00 0.00 0.00 0.00 39,000.00 0.00
GG10-017 Painting 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
GG10-018 Plumbing 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 0.00
GG10-019 HVAC 7,500.00 0.00 0.00 0.00 0.00 0.00 7,500.00 0.00
GG11-000 Sludge DewateringSystem & Pipe
GG11-001 Centrifuge 525,000.00 346,215.00 0.00 0.00 346,215.00 65.95 178,785.00 17,310.75
GG11-002 Progressive Conveying System 7,000.00 0.00 0.00 0.00 0.00 0.00 7,000.00 0.00
GG11-003 Sludge Conveying System 18,000.00 0.00 0.00 0.00 0.00 0.00 18,000.00 0.00
GG11-004 Process Pipe 200,000.00 18,000.00 0.00 0.00 18,000.00 9.00 182,000.00 900.00
GG12-000 Site Paving
GG12-001 Lump Sum 50,000.00 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00
GG13-000 Engineered Fill
GG13-001 Lump Sum 4,400.00 0.00 0.00 0.00 0.00 0.00 4,400.00 0.00
GG14-000 Flowable Fill

Application and Certificate For Payment -- page 9

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 18
Date: 05/31/10
Period To: 05/31/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
Previous Application This Period
GG14-001 Lump Sum 11,000.00 0.00 0.00 0.00 0.00 0.00 11,000.00 0.00
GG18-000 Alternate G-18
GG18-001 Lump Sum 125,000.00 125,000.00 0.00 0.00 125,000.00 100.00 0.00 6,250.00
Subtotal 1,180,400.00 489,215.00 63,000.00 0.00 552,215.00 46.78 628,185.00 27,610.75
Application Total 7,869,424.34 6,563,865.00 187,674.34 0.00 6,751,539.34 85.79 1,117,885.00 337,576.97

[Handwritten top right: 5. MINUTES a. 6 pgs]

DRAFT #2

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
May 10, 2010

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday May 10, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Joseph McCawley, Dana Pizarro and Michael Steinberger. Also in attendance were: Rick Smith, Township Manager; Scott Towler from Brickhouse Environmental; Evan Andrews, Authority Engineer; Bob Adams, Authority Solicitor, Ellen Carmody, Historical Commission; and Megan Hedgecock, Planning Commission.

COMMON ACRONYMS:

MA - Municipal Authority I&I - Inflow & Infiltration
HC - Historical Commission RCSTP - Ridley Creek Sewer Treatment Plant
PC - Planning Commission LCSTP - Lochwood Chase Sewer Treatment Plant
CB - Conservancy Board DEP - Department of Environmental Protection
PR - Park & Recreation Board EPA - Environmental protection Agency
BOS - Board of Supervisors NPDES - National Pollutant Discharge Elimination System
SSO - Sanitary System Overflow WAS - Waste Activated Sludge

1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.

2. RCSTP REPORTS

  1. Brickhouse Report - Scott reported that Phase I of the Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project has largely been completed as of May 5, 2010. There are a few equipment issues from phase I which need to be resolved that will carry over into phase II. These issues were not believed to be significant enough to discontinue moving forward with the remaining phases. During the month of April, final preparations were completed to allow the SBRs to be filled with treated effluent from the existing treatment plant to simulate the treatment process. Using several electric pumps, treated effluent was transferred from the effluent overflow box into the dog house manhole where it flowed by gravity through the Screen Building into the influent lift station. The influent lift station pumped the water into one of the four (4) SBRs. The SBRs cycled through all of the treatment cycles in the same manner as if they contained mixed liquor suspended solids with raw wastewater. Representatives from Siemens were on site to provide training and start up services. During this “wet test” period, the Authority Staff assisted Worth & Company to simulate plant operation during a significant rain event. Additionally, power failures were simulated to evaluate the effect of the treatment plant equipment. Items of concern included replacing a failed overload relay for SBR number 3 mixer pump, Siemens UV lamp bank number 1 (which has been resolved), and the Aqua Aerobics disc filter control panel. Correction actions for the Siemens and Aqua Aerobics control panel will carry over into Phase II.

MA Minutes 05/10/2010 1

[Handwritten top right: 2 of 6]

Key administrative and contractual items on task for presentation to the Authority Board members include discussion of Worth & Company's letter dated February 15, 2010 requesting change in the substantial completion date of June 30, 2010 to September 30, 2010 and Clinger letters dated March 15, 2010 and April 30, 2010.

Mike asked if there are any problems, delays, etc. anticipated with start up. Regarding the existing drain line in the treatment plant, Worth said it was out of their scope and not shown on the proposed plan. Evan confirmed that they did install a new pipe. On day 2 the SBRs were short cycling and quality of the effluent was not good. Now they are working on a normal 6 hour cycle. DEP representatives have been out twice and are pleased with what they see. Three existing metal tanks are empty and being cleaned. There will be a 5 day continuous run when all phases are complete.

b. Tank Cleaning Bid – The bid went to Aqua with the lowest bid of $24,234.00. Other bids received were:
US Environmental $25,014.00
Franc Environmental $34,016.00
Russell Reed $34,586.00
McGovern Environmental $46,534.00

RCSTP CHANGE ORDERS

A. None

3. RCSTP INVOICES

A. Grainger, #9217937037, 3/31/10, $275.50 and Grainger #9228782778, 4/14/10, $641.98 and Grainger #9231297822, 4/16/10, $28.58. Joe moved to approve payment of these 3 invoices. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

B. Continental Fire & Safety, #37184, 4/15/10, $1,127.48. Mike moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

C. Brickhouse Environmental, #5333, 5/3/10, $11,931.25. Joe moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

D. Worth & Co., #P28001, 4/30/10, $170,263.75. Joe moved to approve payment. Fran seconded the motion. Discussion followed regarding the fact that Worth & Co. still has not submitted the invoice properly to show change order credits of $42,700. The motion was opposed unanimously. Rick will direct staff that this won't be paid until properly submitted.

E. Wm. H. Clinger Corp, #EGMA0707, 5/2/10, $34,539.38. Mike moved to approve payment. Dana seconded the motion. Joe pointed out that the note on page 18 stating that “upon receipt Clinger will pay....” is not a release of liens. They must use the proper form, and the form must be signed and notarized. Liens have to be received before payment is given in order to be sure the subcontractors have been paid. Mike changed the motion to

MA Minutes 05/10/2010 2

Aqua Wastewater Management, Inc.

PO Box 822552
Philadelphia, PA 19182-2552
Customer Service: (215) 799-2200
Toll-Free: (800) 338-9271
Fax: (215) 799-2205

Invoice

Number: 117366
Date: 28-May-2010
P.O. Number:
Job Description: 2-tank cleanings
Order Num: 161112
Serviced: 15-May-2010

BILL TO: 69434
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

JOB SITE:
Ridley Creek STP
Town Drive & Line Road
West Chester, PA

Quantity ServiceType Amount Tax Warranty & Expiration Extension
1 Disposal Charges
TOTAL OF 54 TONS OF GRIT @ 96.00-A TON-SEE ATTACHED BREAKDOWN
$5,184.00 No 0 Days $5,184.00
1 Disposal Charges
TOTAL OF 153,100 GALLONS OF SLUDGE @ .227 A GALLON-SEE ATTACHED BREAKDOWN
$34,753.70 No 0 Days $34,753.70
Taxable Amount: $0.00 Tax Rate: 0 Tax: $0.00 Description: PA Tax Exempt Subtotal NonTaxed: $39,937.70
Subtotal Taxable: $0.00
Subtotal Tax: $0.00
Payment Terms: Net 30 Payment: $0.00 Adjustment: $0.00 Late Charge: $0.00 Please Pay: $39,937.70

PA State Homeowner Protection Act, Registration #PA022859

A LATE CHARGE FEE OF 1.5% PER MONTH WILL BE APPLIED TO OVERDUE ACCOUNTS.

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-7452

Please detach here and return the bottom portion with your payment.

From:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Order No. Invoice No. Date Amount Due
161112 117366 28-May-2010 $39,937.70
Serviced 15-May-2010

To:
AS - Aqua Wastewater Management, Inc.
PO Box 822552
Philadelphia, PA 19182-2552

[Handwritten note: Back For MA MTS [signature]]

[Handwritten top right: 3 of 6]

payment is approved contingent upon receipt of properly signed and notarized liens from the beginning of the contract. Joe seconded this motion. There was no further discussion or public comment. The motion passed unanimously.

F. Pennoni, #438249, 5/5/10, $18,810.50. Dana moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

Mike noted that regarding the invoices, he wants Evan's signature on all copies before the meeting starts.

4. CHAIRMAN'S REPORT

A. Jack thanked Dana for making it possible for him to attend the PMAA meeting. It was very interesting.

B. Jack went to the West Goshen meeting. They approved the Board's request.

C. Jack acknowledged the invitation to the joint ABC meeting on Saturday, May 15, 2010 from 8:30 to 11:00 am.

5. APPROVAL OF MINUTES

A. Joe moved to approve the minutes of the April 12, 2010 meeting as corrected. Dana seconded the motion. The motion passed unanimously.

6. ENGINEER'S REPORT

Evan reported that construction phase services continue including: progress meetings with the Contractors and Township every other Thursday; observation services continue, including coordination and communication with Brickhouse and the Township; receipt, review, and return of Contractor submittals; negotiation, review, and approval of Payment Requests.

A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail. At present the current authorized schedule (11/2009 to 6/2010) is approximately 75% complete and budget is approximately 92% expended. Equipment start-up, “SBR seeding”, and contractor RFI's and coordination has been consuming much of our time for the past three months.

I/I Metering Project –The Township continues to meter flows at selected locations.

Ridley Creek Consent Order – Temporary flow meters have been installed by the Township at the locations noted above under “I/I Metering Project”. Public Works has been aggressively locating and repairing sewers and laterals where I/I is observed.

The third Semi-Annual Report was prepared and submitted to DEP on March 26, 2010 as required by the CO&A. No comments have been received. The next report is due to DEP by September 30, 2010.

MA Minutes 05/10/2010 3

[Handwritten top right: 4 of 6]

LCSTP Elimination, Hershey Mill PS Diversion, Reserve (Sherman) PS and Marydell PS Elimination Planning – The updated reports will be available this month.

7. APPROVAL OF INVOICES

A. Gawthrop Greenwood, #78561, 3/31/10, $627.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously

B. Gawthrop Greenwood, #78562, 3/31/10, $304.00. Mike moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously

C. Pennoni, #438211, 5/3/10, $315.00. Fran moved to approve payment. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously

D. Pennoni, #438212, 5/3/10, $367.50. Joe moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously

8. LIAISON REPORTS

A. Historical Commission – Ellen noted that Living History Day is June 5, 2010. The Town Tours and Village Walks are July 22, 2010. They will use a Revolutionary theme. Since this is a County-wide event, they need lots of help with parking, etc.

B. Planning Commission – Megan reported that they recommended approval of the National Bank of Malvern plan.

9. FINANCIAL REPORTS

Rick stated that the grant was received and contracts sent to Worth.

10. GOALS

Jack has the article ready for the Township Newsletter. Dana will attend the 2nd Quarter West Goshen meeting on June 2, 2010.

11. OLD BUSINESS

A. Budget for 2010 – An update was included in the May packet. It was broken down as Mike requested. Mike moved to approve the 2010 Operating budget as amended. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
Mike moved to approve the Ridley Creek Budget as presented. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

B. Applebrook Spray Permit. Rick will send a letter to Hank Berber at Applebrook regarding this issue.

MA Minutes 05/10/2010 4

C. The Board reviewed and discussed Pennoni’s response to the Wm. Clinger Corp. letters. Rick will forward it to Clinger stating that the Board would like to meet with them to discuss it.

12. NEW BUSINESS

A. Diffuser Heads - Evan noted that they will need 48 new diffuser heads at $65 each plus labor, etc. Joe moved to authorize the purchase and installation of diffuser heads up to $10,000.00. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

B. Pennoni – Joe noted that Pennoni has been over by 30% each month. Of the money allocated to carry through to June 30, 2010, there is only $8,000.00 left. Pennoni has been invoicing $18,000.00 per month. Evan explained the amount of work being done. Joe moved to raise the allowance for Pennoni’s services to 6/30/2010 by $22,000.00. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

13. CAPACITY REQUESTS

None

14. SEWER REPORTS

Mark Miller’s written report follows:
Meter: Meters were read on a daily basis. The portable meters are being read on a weekly bais.

C.C. Collection – We have been busy making repairs to the system. To date, we have repaired 8 major breaks. We have several more to replace.

R.C. Collection - We have made several repairs to the system. We will be replacing manhole covers in the Bowtree Development due to large pick holes.

Plants – The plants are running well, no problems to report.

Ridley Creek Plant – As I reported earlier, the plant went live on May 4, 2010.

PA One Calls – 112 PA One Calls for the month of April 2010.

Alarms – 14 alarms for the month of April

15. ANY OTHER MATTER

None

16. CORRESPONDENCE

None

MA Minutes 05/10/2010 5

17. PUBLIC COMMENT

None

19. ADJOURNMENT

There being no further business, Mike moved to adjourn the meeting. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The public meeting was adjourned at 9:30 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 05-10-10 DRAFT2.doc

MA Minutes 05/10/2010 6

5. MINUTES
b
3pg

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
SPECIAL MEETING MINUTES
May 20, 2010

The East Goshen Township Municipal Authority held a special meeting on Thursday May 20, 2010 at 8:00 a.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Joseph McCawley (by phone), and Dana Pizarro. Also in attendance were: Rick Smith, Township Manager; Scott Towler and Dave Evans from Brickhouse Environmental; Evan Andrews, Authority Engineer; Bob Adams, Authority Solicitor, and Carmen Battavio, Township Supervisor.

COMMON ACRONYMS:

MA- Municipal Authority I&I – Inflow & Infiltration
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant
CB – Conservancy Board DEP – Department of Environmental Protection
PR – Park & Recreation Board EPA – Environmental protection Agency
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
SSO – Sanitary System Overflow WAS – Waste Activated Sludge

1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

Chairman Jack Yahraes called the meeting to order at 8:00 a.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.

2. NEW BUSINESS

a. Worth, application No. 17, 4/30/10, $170,263.75. After consultation with the counselor, Rick reported that this invoice should be paid. Worth agreed to a 2 day extension to July 2, 2010. They will apply the credit when the payment is authorized. Dana moved to approve payment of the Worth application No. 17 for $170,263.75 and to authorize a 2-day extension to July 2, 2010 and authorize Jack to sign the change order. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

b. Worth Change Orders

1. PCO-19, 5/17/10, $27,702.20. This is for replacing the air drops in the former aeration (DAVCO) tanks with a time extension of 4 days. The existing aeration diffusers are beyond repair and must be replaced. The drop Pipes are pitted and should be replaced. This is not included in the original contract. There will be 48 diffusers. Stainless steel is required so Dana asked that it be included in the materials description. Fran moved to approved payment and include Stainless Steel in the description. Dana seconded the motion. There was no further discussion. The motion passed unanimously.

2. PCO-20, 5/17/10, $3,516.77. This is for 2 additional doors in the dewatering building per Township request. They are rusted through at the bottom. The skylight will be removed and block work will be installed. This PCO has a time extension of 1 day. Dana moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

MA Minutes 05/20/2010 1

3. PCO-21, 5/17/10, $18,094.59. This is to sandblast and paint the existing DAVCO walkways per Township request with a time extension of 6 days (need to verify number of days with Worth). This PCO is necessary since the walkway is no longer being removed in order to give better access to the sludge digesters. The Contract had called for these to be removed. This includes a credit of $4,000.00 which was the cost to demolish. They are rusted but the supports are sound. Joe said to be sure there is a welder at the inspection to take care of any spots. Also, specify epoxi paint will be used and the surface prep and finish will be the same as the other walkways. Joe moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.

4. PCO-22, 5/17/10, CREDIT amount of $13,875.00. This is to DELETE concrete removal in the DAVCO clarifier floor and raising the fill and draw piping by approximately 13 inches. The impact to the project is a change in operating levels in the post-equalization tank which can be accommodated with no other changes. There is no time extension involved with the PCO. Joe moved to approve PCO-22. Dana seconded the motion. There was no further discussion. The motion passed unanimously.

C. Additional Items of Discussion

1. An additional PCO is being prepared by Worth for sandblasting and painting the existing equalization tank per Township request. The ESTIMATED value of the PCO is in the amount of $21,000 for the tank interior and $19,000 for the tank exterior. According to Worth, there is a possibility to reduce this price if alternate steel preparation and painting specifications were allowed. The reduction is reported to be in the 30% to 40% range. Joe recommended doing the interior but wait to go to bid for the exterior. The condition of the tank is the same as the others. Decision on this was deferred.

2. The sludge dewatering building walls were to remain and the rest of the building added on. The plain masonry walls now are not as sturdy as anticipated. It is recommended to take down the wall so the new work is knitted in cleanly. The roof above is already gone. Cost has not been determined but will include removal of the wall down to the existing slab, build up the wall, finish it and frame in the door. It was suggested that 2 more options be considered, drill the walls and fill with concrete or buttress inside to tie to the main wall.
Jack moved to authorize Rick Smith to move forward with this project if the cost is under $5,000.00. If it is over $5,000.00, the Authority will decide by email how they want to proceed. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

Mark will send photos of these areas to the Authority members.

MA Minutes 05/20/2010 2

3. PUBLIC COMMENT

None

4. ADJOURNMENT

There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The meeting was adjourned at 8:40 a.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 05-20-10 SPECIAL MTG DRAFT.doc

MA Minutes 05/20/2010 3

5. MINUTES
C.
1pg

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
SPECIAL MEETING MINUTES
June 7, 2010

The East Goshen Township Municipal Authority held a special meeting on Monday, June 7, 2010 at 9:00 a.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, and Joseph McCawley (by phone). Also in attendance were: Rick Smith, Township Manager; Scott Towler Brickhouse Environmental; and Mark Miller, Public Works Director.

COMMON ACRONYMS:

MA- Municipal Authority I&I – Inflow & Infiltration
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant
CB – Conservancy Board DEP – Department of Environmental Protection
PR – Park & Recreation Board EPA – Environmental protection Agency
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
SSO – Sanitary System Overflow WAS – Waste Activated Sludge

1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

Chairman Jack Yahraes called the meeting to order at 9:00 a.m.

2. NEW BUSINESS

a. Centrifuge – Scott reported regarding the platform the centrifuge is to be installed upon. The original plan called for a total height of 9 feet. The vertical distance has to be increased to 9 feet 6 inches. Pennoni provided an alternate plan using concrete piers 5 feet high and an I beam. This cost may be over $5,000.00. Pennoni will provide the updated plan tomorrow. Galvanized steel is preferred but takes time to produce. A decision was made to use epoxy coated steel. Mount Pleasant is used by Worth to get steel.
Joe moved to authorize Mark Miller to spend up to $10,000.00 for a steel and concrete foundation for the centrifuge. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

3. ADJOURNMENT

There being no further business, Fran moved to adjourn the meeting. Jack seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The meeting was adjourned at 9:30 a.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 06-07-10 SPECIAL MTG DRAFT.doc

MA Minutes 06/07/2010 1

7 INVOICES

COPY

CHECK REQUEST FORM

Approved:
Date Paid:
Check #
Charged to: 07424 7454

Date Form submitted: 5/20/10
Date & Time Check Needed: ____________________

Pay to the Order of: EAST GOSHEN TWP

Mailing Address: ____________________
____________________
____________________

Amount of Check: 142.47

Special Instructions: (Check One)
[ ] Mail Check REGULAR MAIL
[ ] Mail Check: EXPRESS MAIL
[ ] Return Check to Requester
[ ] Hold Check until: ____________________

Explanation of Expenses: Reimburse Gen Fund for 07 - MA Construction Expense office supplies - STAPLES

Request Submitted by: ____________________

STAPLES - 7972 3100 0025 0128

Vendor #1297

5/9/2010

DATE Invoice Amt. 5422.3700 1401.3000 1437.2460 5420.3702 1429.3000 Description
4/12/2010 4.20 4.20 Notebooks
4/17/2010 142.47 142.47 Office Supplies - Ridley Creek
4/29/2010 105.99 105.99 Seagate - Desktop
Total: 252.66 105.99 142.47 4.20 0.00 0.00

To be reimbursed by MA Construction Fund

Statement Total: $252.66

Approved:
Date Paid:
Check #:
Charged to: _ SEE ABOVE DISTRIBUTION

5/20/2010

STAPLES

that was easy.
Low prices. Every item. Every day.
105 E. Swedesford Road
Exton, PA 19341
(610) 594-2553

SALE
1499986 10 001 2
0066 04/17/10 1

QTY SKU PRICE

*****Special Promotion*****
*****Limit 1 at 6.99 ea*****
1 HP 2GB USB FLASH D 751492381039 6.99
Regular Price 12.99ea
Special Savings -6.00ea
1 HP 2GB USB FLASH D 751492381039 12.99
**********************************
1 GE DUPLEX INWALL A 030878861915 5.29
1 RECORD BOOK 300 PG 718103077811 23.99
1 RECORD BOOK 300 PG 718103077811 23.99
1 ATT CRDED SPRPHONE 650530018961 29.99
1 CL BLK KOSKIN 24 C 085854106870 9.99
1 STAPLES 290 DESKTO 718103112499 13.99
1 SPLS 25PK DBLSIDE 718103020565 7.19
SUBTOTAL 134.40
Standard Tax 6.00% 8.07
TOTAL $142.47

Staples Charge 142.47
Card No.: XXXXXXXXXXXX0128 [S]
Auth No.: 017241

TOTAL ITEMS 9

APPROVED BY: [signature]
DATE PAID: ____________________
CHECK #: ____________________
CHARGED TO: 07424-7452
office supply

COPY

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
04/30/2010
Client No: 6604-01M
Invoice No. 79415

General Authority Services

Fees

Date / Initials Description Hours Total
04/09/2010
RFA
Review packet for Authority meeting of 4/12/10. 0.50
04/12/2010
RFA
Attend regular meeting of Authority. 2.00
For Current Services Rendered 2.50 475.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.50 $190.00 $475.00
Previous Balance $627.00
Total Current Charges 475.00
04/22/2010 Fee Payment -475.00
Balance Due $627.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

COPY

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
04/30/2010
Client No: 6604-06M
Invoice No. 79416

Ridley Creek Treatment Plant Upgrades/ Expansion

Fees

Date / Initials Description Hours Total
04/12/2010
RFA
Attend executive session of Authority to discuss Clinger and Worth issues relating to RCSTP. 1.00
04/13/2010
RFA
Review correspondence from Clinger dated March 15, 2010 and multiple exhibits attached thereto regarding reasons for delay and increased cost. 1.00
04/14/2010
RFA
Review message from Rick Smith with proposed letter to Clinger. 0.40
04/14/2010
RFA
Message to Rick Smith regarding letter to Clinger for meeting date. 0.30
04/16/2010
RFA
Review Clinger and Worth agreements and associated contract documents. 1.20
04/23/2010
RFA
Conference with Rick Smith, Authority members and consultants regarding resolution of Clinger claim. 1.50
04/27/2010
RFA
Telephone conference with Rick Smith regarding Aqua PA tank cleaning bid. 0.30
For Current Services Rendered 5.70 1,083.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 5.70 $190.00 $1,083.00
Previous Balance $304.00
Total Current Charges 1,083.00

East Goshen Municipal Authority

Ridley Creek Treatment Plant Upgrades/ Expansion

Page: 2
04/30/2010
Client No: 6604-06M
Invoice No. 79416

04/22/2010 Fee Payment -57.00
Balance Due $1,330.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

10. GOALS
2 pgs

2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
JUNE REPORT

ON-GOING

  1. Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - completed; Need by 8/11/10 Joe; Need by 11/10/10 Dana
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana; 3 rd Quarter (September) Joe; 4 th Quarter (December) Jack
  3. Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10).
  4. Implement I & I Plan. - Ongoing – March Report filed
  5. Conduct a sewer facilities tour after RCSTP construction is complete

RIDLEY CREEK PROJECT

  1. Monitor construction.
  2. Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. SBR Tour conducted on 3/15/10
  3. Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. SBR Class conducted on 3/15/10
  4. Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)

ACT 537 PLANNING

  1. Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project.
  2. Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project.
  3. Obtain Act 537 Plan approval for the Marydell PS Abandonment project.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\061410c.doc

2 of 2

  1. Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
  2. Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project.

FUNDING

  1. H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. We have submitted the payment request.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\061410c.doc

11 OLD BUSINESS
Differ To June mtg
2 pgs

RECEIVED AFTER AGENDA WAS PRINTED

Pennoni

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

February 3, 2010

10-16507

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Chester Creek Sewage Collection System Modeling
Estimated Fee and Schedule

Dear Mr. Smith:

As discussed January 29, 2010, we recommend that a hydraulic model be developed for the Township’s Chester Creek Sewage Collection System similar to the model developed in 2009 for the Ridley Creek Sewage Collection System. The purpose of this modeling is to determine if any physical constraints exist which would not allow for the conveyance of peak wet weather flow to West Goshen as well as the effect of future development within this service area and diversions from the service area to the Ridley Creek Sewage Collection System.

SCOPE OF WORK

The estimated fee and schedule presented here is for model development, analysis, and mapping updates.

  • Collect sewer plans previously scanned by the Township
  • Review these plans and develop a network model of the sewage collection system
  • Estimate base flows into the sewer network at selected “nodes”
  • Using sewer data on the available plans (pipe lengths, sizes, materials and elevations), construct a hydraulic model of the sewer system using SewerCAD, a software package created to analyze sewer systems.
  • Calibrate the hydraulic model using available flow meter data collected under the inflow and infiltration abatement program as well as the Township’s permanent meters.
  • Project wet weather peak flows in the sewer system using the meter data.
  • Estimate future flows through the sewer system using data available in the Township’s Chapter 94 Reports. Apply the future flows to the base flows and re-run the hydraulic model for future dry weather and wet weather flows.

PRO WG Sewer Modeling.doc

One Drexel Plaza • 3001 Market Street, 2nd Floor • Philadelphia, PA 19104 • Tel: 215-222-3000 • Fax: 215-222-0384
www.pennoni.com

2 of 2

10-16507
February 3, 2010
Page 2
Rick Smith, Township Manager
Chester Creek Collection System Modeling

  • Identify physical constraints on the sewer system that do not allow for the conveyance of peak wet weather flow to West Goshen, if any.
  • For identified constraints, if any, develop and conduct a brief evaluation of alternatives to relieve the constraint.
  • Prepare a report summarizing the model development, analysis and identified constraints, if any, and alternatives to relieve the constraints.

SCHEDULE

Immediately upon authorization we will initiate the model development and analysis. Note that we have already collected the majority of sewer maps as available from the Township in an effort to expedite the schedule.

ESTIMATED FEE

The estimated fee for this scope of work is $26,900.00, to be billed on an hourly basis at our standard rates established in our current Engineering Services Agreement. Please note that this estimated fee does not include surveying services that might be necessary to locate or verify sewer locations or elevations in the field. These services, if needed, can be provided at our standard rates.

Should you have any questions or need additional information, please do not hesitate to call.

Very truly yours,

PENNONI ASSOCIATES INC.
[signature]
Evan R. Andrews, P.E.
Authority Engineer

PRO WG Sewer Modeling.doc

12. NEW BUSINESS
a.
8 pgs

Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: June 10, 2010
To: Municipal Authority
From: Rick Smith, Township Manager
Re: Ridley Creek Sewer Plant Project
Outstanding Issues

Completion – The current date for substantial completion is August 6, 2010.

Pennoni – At your meeting on May 10th you authorized an additional $22,000 for construction services which brought the budget up to $121,700. Upon the payment of the current invoice there will be a balance of $10,500. I would suggest that you authorize another $22,000 to get us thru July.

Brickhouse – Our agreement with Brickhouse contemplated that substantial completion would occur in June. I have asked them to modify their work sheet to reflect he fact that it will not occur as scheduled. They have projected their hours and costs thru the Authority meeting in September. If we close up everything by that date we will be $22,000 under budget,

Clinger- We are scheduled to meet with Clinger on Friday. I will e-mail a synopsis of the meeting.

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Memo to MA 060910.doc

2 of 8

FILE

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 14, 2010

Mr. Evan Andrews, PE
Pennoni Associates Inc.
One Drexel Plaza
3001 Market Street, Second Floor
Philadelphia, PA 19104

Re: Ridley Creek Sewage Treatment Plant SBR Expansion
Continued Construction Services
Proposal dated May 6, 2010

Dear Evan:

At their meeting on May 10, 2010, the East Goshen Municipal Authority authorized the expenditure of up to $22,000 for continued construction services for the upgrade and expansion of the Ridley Creek Sewer Treatment Plant. This funding is anticipated to cover construction services until June 30, 2010.

Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[signature: Rick]
Louis F. Smith, Jr.
Township Manager

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Design\Letter to Pennoni 051410.doc

3 of 8

Pennoni

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

May 6, 2010

EGMA0707

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: RCSTP Upgrade and Expansion
Continued Construction Services

Dear Mr. Smith:

As you know, Pennoni provided an estimated fee for Continued Construction Services that was accepted and approved by the Authority Board on January 11, 2010. At the time that the estimated fee was prepared (November 4, 2009), the construction was expected to be complete by June 30, 2010. It has since become apparent that the construction will likely continue until September 30, 2010 followed by contract close-out activities.

The approved estimated fee was $99,700.00. As of Pennoni’s current invoice (#438249 dated May 5, 2010), Pennoni has expended $91,817.98 through April 18, 2010. The authorized budget is expected to exceed the current authorization with the next invoice (effort through May 21, 2010).

Over the past 5 months, the rate of effort expended by Pennoni on this project is approximately $18,400 per month. Given the projected construction end date of September 30, 2010 (5 months from now), and approximately 1 month of project close-out activities (punchlist, contractor final application for payment, as-built plans, etc.), Pennoni recommends that the authorized budget for Continued Construction Services be increased by $110,000.00 (rounded).

Pennoni will continue to make every effort to minimize our effort on the project, however given the history of the construction to date, we cannot provide a final estimate of engineering services required to complete this project.

Should you have any questions or need additional information, please do not hesitate to call.

Very truly yours,

PENNONI ASSOCIATES INC.
[signature]
Evan R. Andrews, P.E.
Authority Engineer

One Drexel Plaza • 3001 Market Street • Philadelphia, PA 19104-2897 • Tel: 215-222-3000 • Fax: 215-222-3588

4 of 8

Pennoni

PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 440011
Invoice Date: 05/25/2010
Project: EGMA0707
Project Name: RCSTP Expansion

For Services Rendered through: 05/16/2010

Construction meetings with contractors and Township; construction management; shop drawing and schedule review; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting control problems with UV system, effluent weir plate, and SBR #3 overload; responses to Contractor RFIs; schedule reviews; and review/negotiations of change orders with Township and contractors.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Permit Design est. $111,400.00 $111,385.00 $111,385.00 $0.00
02 -- Permitting est. $14,200.00 $14,184.00 $14,184.00 $0.00
03 -- Final Design est. $226,700.00 $226,655.50 $226,655.50 $0.00
04 -- Bidding est. $14,500.00 $14,446.50 $14,446.50 $0.00
05 -- Construction est. $136,200.00 $136,197.62 $136,197.62 $0.00
06 -- Additional Submittals est. $20,000.00 $19,997.18 $19,997.18 $0.00
10 -- Continued Construction Services est. $121,700.00 $91,817.98 $111,105.48 $19,287.50
Total : $644,700.00 $614,683.78 $633,971.28 $19,287.50

Amount Due This Invoice: $19,287.50

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA0707 Invoice Summary

Invoice Date 05-25-2010

Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 440011
Invoice Period: 4/19/2010 to 5/16/2010
Initial Authorization: $ 465,000.00 Date: 8/14/2007
Changes: $ - Date: 2/5/2009
Changes: $ 58,000.00 Date: 5/11/2009
Changes: $ 99,700.00 Date: 1/11/2010
Changes: $ 22,000.00 Date: 5/10/2010
Contract Amount: $ 644,700.00
Previously Invoiced: $ 614,683.78
Current Invoice: $ 19,287.50
Invoiced to Date ($): $ 633,971.28
Invoiced to Date (%): 98%
Remaining Budget ($): $ 10,728.72
Remaining Budget (%): 2%

Budget by Phase:

Phase No. 05 06 10
Phase Name: Construction Additional Engineering Continued Eng Svcs
Phase Budget: $ 88,200.00 $ 10,000.00 $ 99,700.00
Changes: $ 48,000.00 $ 10,000.00 $ 22,000.00
Contract Amount: $ 136,200.00 $ 20,000.00 $ 121,700.00
Previously Invoiced: $ 136,197.62 $ 16,469.18 $ 91,817.98
Current Invoice: $ - $ 3,528.00 $ 19,287.50
Invoiced to Date ($): $ 136,197.62 $ 19,997.18 $ 111,105.48
Invoiced to Date (%): 100% 100% 91%
Remaining Budget ($): $ 2.38 $ 2.82 $ 10,594.52
Remaining Budget (%): 0% 0% 11%

Comments: Phase 10 - Continued Engineering Services
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; and site observation of construction. Consultation with Township regarding same.

Additional effort this invoice period has included Phase 2 start-up; review of the mixed liquor transfer from existing system to new SBR tanks with operator; troubleshooting problems with UV system, effluent weir plate and SBR #3 overload; responses to Contractor RFIs; schedule reviews; tracking pressure test failure; and review/negotiations of change orders with Township and contractors.

Invoiced effort does not include effort related to responding to the Electrical Contractor's letter of 3/15/2010.

East Goshen Municipal Authority

EGMA0707 Invoice Summary

Invoice Date 05-25-2010

Effort by Labor Category under Phase 10:

Category Previous Hrs. Current Total Hrs.
Authority Engineer 72.75 23.00 95.75
Senior Engineer 259.50 25.00 284.50
Senior Designer 98.00 30.00 128.00
Project Engineer 49.00 35.00 84.00
Associate Engineer 7.00 0.00 7.00
Graduate Engineer 43.00 0.00 43.00
Project Representative/Inspector 2.50 0.00 2.50
Technical Specialist (McAloon) 541.00 115.50 656.50
Engineering Technician I 13.50 0.00 13.50
Administrative Assistant I 0.50 0.00 0.50
Totals 862.75 228.50 1315.25

Budget/Schedule Status (November to June):
Schedule % = 88%
Budget % = 91%

Brickhouse Environmental

Consultants and Engineers

June 10, 2010

Mr. Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Ridley Creek Sewer Treatment Plant Expansion
Project Manager Schedule Supplement
BE Project No. 09-2532-0

Dear Mr. Smith:

This letter's purpose is to notify the Authority of a time extension within the approved original budget estimate for Brickhouse Environmental's role as Project Manager for the Ridley Creek Sewer Plant Expansion and provide the enclosed adjusted Project Management Schedule Supplement.

Brickhouse Environmental's original not to exceed budget ($175,030 at $115 per hour) was based upon a 67 week duration to August 8, 2010. This included Construction Contract Closeout Project Management tasks that extended beyond Construction Substantial Completion.

Approved Change Orders for construction adjustments have extended the estimated Construction Substantial Completion into Week 64. Accordingly, the enclosed Schedule reflects adjustment by extending Brickhouse Environmental's involvement to Week 73 and the Monthly Authority Meeting in September 2010. Despite this time extension and as shown on the enclosed Schedule, Brickhouse Environmental does not expect to reach the original approved $175,030 due to our actual hours, to date, being less than originally estimated. A contingency of hours and value beyond the adjusted Schedule's projected totals remain in the approved original budget for Brickhouse Environmental.

We have enjoyed our association with you and the Authority and hope this information is helpful. Please contact me with any questions.

Best Regards,

David W. Evans
Project Manager

Encl.
cc: Scott Towler, P.E., Project Manager
DWE/ps
J:\092532.0\Correspondence\Projected Totals Letter.doc

515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com

When Creativity & Experience Count

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement

The original budget estimate was adjusted from 67 weeks for a cumulative $175,030 (at $115/hour) to 73 weeks for the same cumulative $175,030 (at $115/hour) in order to:
1. Reflect actual total as of May 31, 2010 as a new baseline; and
2. Develop a new schedule based upon Substantial Construction Completion in week 64 (18-July-2010) and Construction Contract Closeout in week 73 (19 Sep-2010).

Week Ending Projected Totals Actual Totals
Project Management Cumulative Hours Cumulative Fees Monthly Fees Project Management Cumulative Hours Cumulative Fees Monthly Fees
31-May-10 Week 58 (1 day) 4 982.25 $112,959 $9,660 89.8 982.25 $112,958.75 $10,321.25
6-Jun-10 Week 58 (4 days) 24 1,006 $115,719
13-Jun-10 Week 59 24 1,030 $118,479
20-Jun-10 Week 60 24 1,054 $121,239
27-Jun-10 Week 61 24 1,078 $123,999
30-Jun-10 Week 62 (3 days) 16 1,094 $125,839 $12,880
4-Jul-10 Week 62 (2 days) 8 1,102 $126,759
11-Jul-10 Week 63 24 1,126 $129,519
18-Jul-10 Week 64 24 1,150 $132,279
25-Jul-10 Week 65 24 1,174 $135,039
1-Aug-10 Week 66 24 1,198 $137,799 $11,960
8-Aug-10 Week 67 24 1,222 $140,559
15-Aug-10 Week 68 24 1,246 $143,319
22-Aug-10 Week 69 20 1,266 $145,619
29-Aug-10 Week 70 20 1,286 $147,919
31-Aug-10 Week 71 (2 days) 6 1,292 $148,609 $10,810
5-Sep-10 Week 71 (3 days) 12 1,304 $149,989
12-Sep-10 Week 72 16 1,320 $151,829
19-Sep-10 Week 73 8 1,328 $152,749 $4,140

The above schedule reflects projected totals. A contingency budget of 194 hours and $22,281 remains to meet the original contract total value.

J:\092532.0\Project Management\PM Schedule\Schedule.xls

Page 1 of 1

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 4, 2010

To: Municipal Authority
From: Mark Miller
Re: May 2010 Monthly Report

Meter: Meters were read on a daily basis. We continue to read the portable meters.

C.C. Collection: To date we have repaired 14 INI problems. I have spoken with two plumbers that have stated they have repaired seven sewers where they have found clean out pipe's have separated. We believe this was caused by the frost during the winter.

R.C. Collection: Two more repairs were made for INI.

Pumping Station: All pumping stations were cleaned. The stations were visited on a routine basis. We did experience a problem with the transducer at the Barkway Pumping Station.

Lochwood Plant: The plant was visited by the Public Works Department on a daily basis. The bar screen was cleaned. We did have a problem with one of the floating aerators. Lenni Electric was used to trouble shoot the meter.

Ridley Creek Plant: Was visited on a daily basis. Township personal assisted the plant operator on an as-needed basis. We have had some minor problems with regards to equipment. Vendors have been very responsive during the start up.

f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority may report doc..doc

Ridley Expansion: The wet well have been removed. The demolition of the sludge room has been completed. Worth and Company has completed the demolition of equipment on the two tanks. They are installing the new piping in the tanks. The new walls in the sludge room are going up.

Township personal removed the Roto mat and pumps from the wet well and Eq. tank, I have contacted several of our vendors to let them know this equipment is for sale.

The Transducers and mag meters were removed, these can be used at our pumping stations.

Pa One Calls: We received 74 PA One calls for the Month of May.

Alarms: 12 alarms for the month of May.

f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority may report doc..doc

2008 FLOWMETERS

2010 MAY 2ND QUARTER

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY 1000 GPD ELLIS LANE READING ELLIS LANE 10 GPD PAOLI PIKE READING PAOLI PIKE 10 GPD WILSON DRIVE READING WILSON DRIVE 10 GPD SUMMIT GPD NET FLOWS
0 05/01/10 20,400 0
0.5 05/02/10 20,400 0
1.27 05/03/10 1,637,576 1,365,000 13,650,449 155,845 7,604,043 86,305 8,821,754 48,173 20,400 1,074,678
0 05/04/10 1,639,137 1,561,000 13,669,172 187,230 7,614,181 101,380 8,828,374 66,200 20,400 1,206,190
0 05/05/10 20,400 0
0 05/06/10 1,641,994 1,428,500 13,701,297 160,625 7,632,070 89,445 8,842,359 69,925 20,400 1,108,505
0 05/07/10 20,400 0
0 05/08/10 20,400 0
0 05/09/10 20,400 0
0 05/10/10 1,647,200 1,301,500 13,760,188 147,228 7,666,053 84,958 8,863,096 51,843 20,400 1,017,473
0 05/11/10 1,648,477 1,277,000 13,774,429 142,410 7,673,858 78,050 8,868,381 52,850 20,400 1,003,690
0.12 05/12/10 1,649,827 1,350,000 13,789,542 151,130 7,682,816 89,580 8,874,263 58,820 20,400 1,050,470
0 05/13/10 1,651,142 1,315,000 13,804,675 151,330 7,691,429 86,130 8,880,242 59,790 20,400 1,017,750
0 05/14/10 1,652,427 1,285,000 13,818,874 141,990 7,699,986 85,570 8,886,221 59,790 20,400 997,650
0 05/15/10 20,400 0
0 05/16/10 20,400 0
0.68 05/17/10 1,656,224 1,265,667 13,861,072 140,660 7,725,670 85,613 8,897,503 37,607 20,400 1,001,787
0.44 05/18/10 1,657,496 1,272,000 13,874,556 134,840 7,734,377 87,070 8,901,962 44,590 20,400 1,005,500
0 05/19/10 1,658,901 1,405,000 13,890,777 162,210 7,743,659 92,820 8,907,004 50,420 20,400 1,099,550
0 05/20/10 1,660,179 1,278,000 13,904,889 141,120 7,752,152 84,930 8,912,375 53,710 20,400 998,240
0 05/21/10 1,661,477 1,298,000 13,918,426 135,370 7,760,648 84,960 8,917,854 54,790 20,400 1,022,880
0.3 05/22/10 20,400 0
0.8 05/23/10 20,400 0
0 05/24/10 1,665,149 1,224,000 13,958,382 133,187 7,786,365 85,723 8,928,987 37,110 20,400 967,980
0 05/25/10 1,666,361 1,212,000 13,970,960 125,780 7,794,548 81,830 8,934,214 52,270 20,400 952,120
0 05/26/10 1,667,695 1,334,000 13,984,905 139,450 7,803,525 89,770 8,940,097 58,830 20,400 1,045,950
0.62 05/27/10 1,668,961 1,266,000 13,998,534 136,290 7,812,134 86,090 8,945,860 57,630 20,400 985,990
0 05/28/10 1,670,241 1,280,000 14,012,114 135,800 7,820,823 86,890 8,952,833 69,730 20,400 987,580
0.15 05/29/10 20,400 0
0 05/30/10 20,400 0
0.00 05/31/10 20,400 0
4.88 1,317,648 145,694 87,062 54,671 20,400 1,030,221

DAILY LOC INQUIRER EG TWP

MONTH TO DATE NORMAL MONTH TO DATE YEAR TO DATE NORMAL YEAR TO DATE (DL)

f: Data/Shared Data/Public Works/flowmeters/2010 flowmeters -all-stations separate month worksheets.xls

6/4/20101:36 PM

2008 FLOWMETERS

2010 MAY 2ND QUARTER

HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR SHERMAN BARKWAY
10 100 10 10 10 10
DATE READING GPD READING GPD READING GPD READING GPD READING GPD READING GPD
05/01/10
05/02/10
05/03/1018,831,81069,463825,065100,2508,654,586327,36394,663,285852,253346,4025,8381,513,84112,300
05/04/1018,839,07172,610826,163109,8008,696,011414,25094,755,899926,140347,1557,5301,514,90910,680
05/05/10
05/06/1018,852,43766,830828,12798,2008,772,248381,18594,938,409912,550348,3375,9101,517,18111,360
05/07/10
05/08/10
05/09/10
05/10/1018,878,16564,320831,75990,8008,901,031321,95895,264,438815,073350,3475,0251,521,94211,903
05/11/1018,884,42362,580832,61085,1008,935,729346,98095,346,068816,300350,8394,9201,523,05311,110
05/12/1018,890,71762,940833,50489,4008,972,410366,81095,432,342862,740351,4025,6301,524,26612,130
05/13/1018,897,10463,870834,37587,1009,008,551361,41095,516,892845,500352,0015,9901,525,31510,490
05/14/1018,903,45363,490835,23485,9009,043,905353,54095,599,143822,510352,5845,8301,526,48011,650
05/15/10
05/16/10
05/17/1018,922,80964,520837,83686,7339,131,785292,93395,830,874772,437354,3876,0101,529,78511,017
05/18/1018,929,16963,600838,65481,8009,166,700349,15095,912,179813,050354,9655,7801,530,86310,780
05/19/1018,935,72165,520839,59393,9009,204,546378,46096,002,534903,550355,5756,1001,532,01511,520
05/20/1018,941,78360,620840,41782,4009,241,680371,34096,086,927843,930356,1305,5501,533,19011,750
05/21/1018,946,85450,710841,23181,4009,278,098364,18096,169,718827,910356,6445,1401,534,38211,920
05/22/10
05/23/10
05/24/1018,967,26068,020843,62279,7009,367,977299,59796,395,409752,303358,2435,3301,537,69611,047
05/25/1018,973,26060,000844,35673,4009,402,628346,51096,472,921775,120358,8385,9501,538,71010,140
05/26/1018,979,61663,560845,19283,6009,439,988373,60096,558,715857,940359,4275,8901,539,93212,220
05/27/1018,985,76461,480845,94475,2009,476,847368,59096,641,397826,820359,9885,6101,540,96110,290
05/28/1018,991,80760,430846,73178,7009,514,828379,81096,724,596831,990360,6296,4101,541,97610,150
05/29/10
05/30/10
05/31/10
63,58786,855355,426836,5625,80211,248

f: Data/Shared Data/Public Works/flowmeters/2010 flowmeters -all-stations separate month worksheets.xls 6/4/20101:33 PM

2010 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY 1,425,517 123,265 81,325 63,991 20,400 83,711 103,900 363,921 882,367 5,627 13,543
FEBRUARY 1,462,759 132,866 74,793 70,879 20,400 77,500 103,327 332,371 906,362 5,456 13,156
MARCH 1,603,009 170,328 75,607 63,240 20,400 102,840 146,865 404,526 1,071,132 5,071 19,213
APRIL 1,545,846 174,279 89,043 67,148 20,400 85,455 126,703 386,665 991,262 5,303 13,956
MAY 1,317,648 145,694 87,062 54,671 20,400 63,587 86,855 355,426 836,562 5,802 11,248
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave 1,470,956 149,286 81,566 63,986 20,400 82,619 113,530 368,582 937,537 5,452 14,223

To
West Goshen 1,176,118

2010 flowmeters-all-stations separate month worksheets.xlsSUMMARY

May Precip. 4.88 - 2010

May

Precip.

6 5 4 3 2 1 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

Snow/rain

Monthly Totals 2010 (Jan-Dec)

Monthly Totals

Precip.

9 8 7 6 5 4 3 2 1 0

1 2 3 4 5 6 7 8 9 10 11 12

Month

Flowmeters May 2010

May

Flow#s

1400000 1200000 1000000 800000 600000 400000 200000 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Day of the Month

Monthly Totals 2010 Jan-Dec

Flowmeters

2500000 2000000 1500000 1000000 500000 0

January February March April May June July August September October November December

Month

610-692-7171
www.eastgoshen.org

FYI

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 20, 2010

Dear Property Owner:

The purpose of this letter is to inform you that Mr. Benjamin Mudry, 1137 N. Chester Rd., has applied for a Zoning Variance requesting relief from the zoning ordinance. Mr. Mudry is requesting dimensional relief from the side yard setback requirements of the ordinance; §240-9-G. The applicant proposes to construct a 330 square foot deck that will encroach 6 feet into the required 20' side yard setback area.

Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.

This application is scheduled to be discussed during the meetings outlined below:

June 2, 2010 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm)

June 15, 2010 – Board of Supervisors meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)

June 30, 2010 – Zoning Hearing Board (meeting @ 7:30 pm) (Zoning Hearing)

All meetings and hearings are held at the Township Building and are open to the public. This application and all associated information are available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Mark A. Gordon
Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-2\53-2-32 (1137 N Chester)\Variance 2010\1000 foot ZV ltr 05202010.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 25, 2010

Dear Property Owner:

The purpose of this letter is to inform you that Liberty Towers, LLC has applied for a Zoning Variance requesting relief from the zoning ordinance. The applicant is requesting that the Zoning Hearing Board grant relief to allow a Wireless Communications Facility use in the C-2 Zoning District, and for dimensional relief from the rear yard setback requirements. If granted the relief the applicant proposes to construct a 150 foot tall Wireless Communications tower behind the Wawa store at 1594 Paoli Pike.

The applicant requests relief from the following sections of the Township Zoning Ordinance: §240-15.B and §240-15.G.

Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.

This application is scheduled to be discussed during the meetings outlined below:

June 2, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)

July 6, 2010 - Board of Supervisors meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)

July 15, 2010 - Zoning Hearing Board (meeting @ 7:30 pm) (Zoning Hearing)

All meetings are held at the Township Building and are open to the public and are subject to change. The variance application is available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Mark A. Gordon
Township Zoning Officer

Cc: All Township Boards and Commissions
Richard J. Lemanowicz, Esq. (Via Email and First Class Mail)

F:\Data\Shared Data\Property Management\53-4\53-4-80.01 (1594 Paoli Pike)\Liberty towers Var App May 2010\1000 foot ltr ZV 05252010.doc