Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
July 12, 2010
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental -; Pennoni –; Costs Summary; Change Orders; Worth & Company, Inc.,; Tank Cleaning Bid
- RIDLEY CREEK INVOICES a. Pipe Xpress, Inc. #47081, 6/30/10 $ 126.63 b. Great Valley Lockshop, #90474, 6/15/10 $ 204.40 c. O'Rourke and Sons, #163731, 6/8/10 $ 150.00 d. Pennoni, #442961, 6/29/10 $ 17,901.25 e. Pennoni, #442963, 6/29/10 $ 615.00 f.
- CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES June 14, 2010
- ENGINEER'S REPORT Pennoni report
- APPROVAL OF INVOICES
- LIAISON REPORTS
- FINANCIAL REPORTS
- GOALS
- OLD BUSINESS
- NEW BUSINESS
- CAPACITY REQUESTS
- SEWER REPORTS Director of Public Works Report – June 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - June 2010; Artesian Ridley Creek Report
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
Monday, July 12, 2010
- 1 -
- ADJOURNMENT
**** EXECUTIVE SESSION*****
Pending legal matter
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| August 11, 2010 | October 1, 2010 |
| November 10, 2010 | January 1, 2011 |
Monday, July 12, 2010
- 2 -
[Logo: Pennoni]
[Handwritten: 2. RIDLEY CREEK REPORT
b.
2 pgs]
July 7, 2010
EGMA0707
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: RCSTP Upgrade and Expansion
Continued Construction Services
June 21, 2010 to Anticipated Substantial Completion and Project Close-Out
Dear Mr. Smith:
At the June 14, 2010 Board meeting the Authority requested that Pennoni prepare an estimated effort to complete engineering services for the RCSTP construction from our latest billing period end date (June 21, 2010) to the currently anticipated substantial completion date. As of the date of this letter, the Contractors are projecting completion on or about August 6, 2010. For the purpose of this estimate we have used a date of August 20, 2010 to allow some tolerance for schedule variation.
The Scope of Work over this period includes the following:
- Construction Observation and RFIs (8 weeks totaling 184 hours of effort)
- Participation in Construction Progress Meetings (total of 5 meetings totaling 40 hours of effort)
- Review of Operation & Maintenance Manuals (72 hours of effort)
- Centrifuge Start-Up Assistance (40 hours of effort)
- Complete Plant Start-Up Assistance (40 hours of effort)
- Punch List Preparation and Final Inspections (after Substantial Completion – 40 hours of effort)
- Siemens Performance Test and follow-up (16 hours of effort)
- Project Close-Out Activities (after Substantial Completion – 24 hours of effort)
- Preparation of As-Built Plans in AutoCAD from Contractor Red-Line Plans (after Substantial Completion – 80 hours of effort)
The estimated effort to complete the above items is $42,100.00. This is an estimate and actual effort might vary depending on Contractor performance and other items beyond Pennoni’s control. This estimated effort will not be exceeded without prior approval from the Authority.
[Handwritten: 2 of 2]
| EGMA0707 | July 7, 2010 | Page 2 |
|---|---|---|
| Rick Smith | Continued Construction Services | |
Should you have any questions or need additional information, please do not hesitate to call.
Very truly yours,
PENNONI ASSOCIATES INC.
[Signature: Evan R. Andrews]
Evan R. Andrews, P.E.
Authority Engineer
RCSTP Continued Construction Services (07-07-2010)
[Handwritten: 2 RIDLEY CREEK REPORTS C. 9pgs]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY
June 28, 2010
Includes bills paid at 6/14 meetings
| Name | Budget or Contract amt. | This Month | To Date | Balance | % of work completed |
|---|---|---|---|---|---|
| EXPENSES | |||||
| Borrowing costs | $52,250.00 | $0.00 | $52,250.00 | $0.00 | 100.00% |
| Worth | $7,865,400.00 | $178,290.62 | $6,413,962.37 | $1,451,437.63 | 81.55% |
| change orders | $4,024.34 | $0.00 | $0.00 | $4,024.34 | 0.00% |
| Clinger | $974,000.00 | $34,539.38 | $837,199.44 | $136,800.56 | 85.95% |
| change orders | $31,862.00 | $0.00 | $0.00 | $31,862.00 | 0.00% |
| Pennoni (Inspection) (05) | $136,200.00 | $0.00 | $136,197.62 | $2.38 | 100.00% |
| Pennoni (Continued Services) (10) | $121,700.00 | $19,287.50 | $91,817.98 | $29,882.02 | 75.45% |
| Pennoni (Rechargeable) (06) | $20,000.00 | $0.00 | $12,961.75 | $7,038.25 | 64.81% |
| Brickhouse | $175,000.00 | $10,321.25 | $112,958.75 | $62,041.25 | 64.55% |
| Extras | |||||
| Capital | $53,867.66 | $47,820.26 | $95,281.68 | -$41,414.02 | 176.88% |
| Capital (Identified but not paid) | $73,696.00 | $0.00 | $0.00 | $73,696.00 | 0.00% |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $373.16 | $10,883.11 | $1,116.89 | 90.69% |
| EXPENSES TOTAL | $9,520,000.00 | $290,632.17 | $7,763,512.70 | $1,756,487.30 | 81.55% |
| RECEIPTS | |||||
| Pennoni (Rechargeable) | -$20,000.00 | $0.00 | $0.00 | -$20,000.00 | 0.00% |
| NET | $9,500,000.00 | $290,632.17 | $7,763,512.70 | $1,736,487.30 | |
Retainage (10% until 50% of the project is done then it drops back to 5%)
| Worth | $328,193.25 | 5% |
|---|---|---|
| Clinger | $42,245.28 | 5% |
| Total | $370,438.53 |
We have identified $96,357 in potential extras.
We also have $464,195 in Grant Money available
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
SUMMARY V2
2 of 9 | DETAIL
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT — DETAIL
June 28, 2010
| Category | Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|---|
| Worth | 2/9/2009 | $561,150.00 | Worth & Company | Application #1 | |
| 3/9/2009 | $480,825.00 | Worth & Company | Application #2 | ||
| 4/9/2009 | $768,780.00 | Worth & Company | Application #3 | ||
| 5/8/2009 | $125,352.90 | Worth & Company | Application #4 | ||
| 5/31/2009 | $485,103.12 | Worth & Company | Application #5 | ||
| 6/30/2009 | $267,975.00 | Worth & Company | Application #6 | ||
| 7/31/2009 | $138,217.50 | Worth & Company | Application #7 | ||
| 8/31/2009 | $679,793.40 | Worth & Company | Application #8 | ||
| 9/30/2009 | $504,310.98 | Worth & Company | Application #9 | ||
| 9/30/2009 | $222,861.55 | Worth & Company | Application #10 (5% retainage) | ||
| 10/31/2009 | $724,089.05 | Worth & Company | Application #11 | ||
| 11/30/2009 | $379,360.17 | Worth & Company | Application # 12 | ||
| 12/31/2009 | $374,772.62 | Worth & Company | Application #13 | ||
| 1/31/2010 | $207,881.86 | Worth & Company | Application # 14 | ||
| 2/28/2010 | $69,077.35 | Worth & Company | Application # 15 | ||
| 3/31/2010 | $75,857.50 | Worth & Company | Application # 16 | ||
| 4/30/2010 | $170,263.75 | Worth & Company | Application # 17 | ||
| 5/31/2010 | $178,290.62 | Worth & Company | Application #18 | ||
| $6,413,962.37 | $6,413,962.37 | ||||
| Clinger | 4/9/2009 | $22,152.64 | Clinger | Application #1 | |
| 5/8/2009 | $15,714.77 | Clinger | Application #2 | ||
| 5/31/2009 | $77,973.43 | Clinger | Application #3 | ||
| 6/30/2009 | $12,567.46 | Clinger | Application #4 | ||
| 8/30/2009 | $10,855.98 | Clinger | Application #5 | ||
| 9/30/2009 | $111,255.75 | Clinger | Application #6 | ||
| 10/31/2009 | $59,344.83 | Clinger | Application #7 | ||
| 11/30/2009 | $145,354.05 | Clinger | Application # 8 | ||
| 12/31/2009 | $94,727.00 | Clinger | Application # 9 | ||
| 1/31/2010 | $139,092.94 | Clinger | Application #10 | ||
| 2/28/2010 | $58,514.64 | Clinger | Application #11 | ||
| 2/28/2010 | $41,530.78 | Clinger | Application #12 (5% retainage) | ||
| $13,575.79 | Clinger | Application #13 | |||
| 5/2/2010 | $34,539.38 | Clinger | Application # 14 | ||
| $837,199.44 | $837,199.44 | ||||
| Pennoni | ? | $712.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU ? | |
| 10/30/2008 | $943.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 10/19/08 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
[Handwritten: 3 of 9]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 12/5/2008 | $18,115.98 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 11/30/08 | |
| 1/15/2009 | $12,929.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 12/28/08 | |
| 2/5/2009 | $13,352.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $31,268.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $29,010.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $22,436.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| 7/29/2009 | $3,528.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 7/19/09 | |
| 12/30/2010 | $16,482.50 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 12/31/10 | |
| 1/29/2010 | $24,224.58 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 1/17/10 | |
| 2/23/2010 | $13,057.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 2/14/10 | |
| 4/1/2010 | $19,243.40 | PENNONI ASSOCIATES INC. | ||
| 5/5/2010 | $18,810.50 | PENNONI ASSOCIATES INC. | Through 4/18/2010 | |
| 5/25/2010 | $19,287.50 | PENNONI ASSOCIATES INC. | Through 5/16/2010 | |
| $243,421.88 | $243,421.88 | |||
| Pennoni (rechargeable) | ||||
| 2/5/2009 | $2,840.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $4,934.75 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $3,777.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $1,409.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| $12,961.75 | $12,961.75 | |||
| Brickhouse | ||||
| 5/12/2009 | $2,127.50 | BRICKHOUSE | Apr-09 | |
| 6/1/2009 | $8,452.50 | BRICKHOUSE | May-09 | |
| 7/1/2009 | $7,791.25 | BRICKHOUSE | Jun-09 | |
| 8/3/2009 | $9,315.00 | BRICKHOUSE | Jul-09 | |
| 9/1/2009 | $7,762.50 | BRICKHOUSE | Aug-09 | |
| 10/1/2009 | $7,417.50 | BRICKHOUSE | Sep-09 | |
| 11/2/2009 | $7,072.50 | BRICKHOUSE | Oct-09 | |
| 12/1/2009 | $7,963.75 | BRICKHOUSE | Nov-09 | |
| 1/4/2010 | $7,762.50 | BRICKHOUSE | Dec-09 | |
| 2/1/2010 | $7,618.75 | BRICKHOUSE | Jan-10 | |
| 3/1/2010 | $7,417.50 | BRICKHOUSE | Feb-10 | |
| 4/1/2010 | $10,005.00 | BRICKHOUSE | Mar-10 | |
| 5/3/2010 | $11,931.25 | BRICKHOUSE | Apr-10 | |
| 6/1/2010 | $10,321.25 | BRICKHOUSE | May-10 | |
| $112,958.75 | $112,958.75 | |||
| Extras - Capital - Paid | ||||
| 12/22/2008 | $44.98 | EAST GOSHEN TOWNSHIP | REIMBURSE GEN.FUND FOR OFFICE DEPOT | |
| 12/31/2008 | $88.00 | FASTSIGNS | RED ON WHITE ALUM. SIGNS | |
| 1/12/2009 | $177.00 | FASTSIGNS | SIGNS - PLEASE AVOID TOWNE DR... | |
| 12/1/2008 | $36.00 | GREAT VALLEY LOCKSHOP | KEYS FOR CONTRACTOR | |
| 12/8/2008 | $160.80 | GREAT VALLEY LOCKSHOP | PADLOCKS, REKEY CYLINDERS & KEYS | |
| 12/29/2008 | $474.82 | HANSON AGGREGATES INC | 36.95 TONS SUBBASE AGGREGATE | |
| 12/31/2008 | $908.00 | HANSON AGGREGATES INC | 70.66 TONS SUBGRADE 2 AGGREGATE | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
DETAIL
[Handwritten: 4 of 9]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 12/15/2008 | $2,089.39 | LENNI ELECTRIC CORPORAT | TEMP SERV. FOR TRAILER - RIDLEY CRK | |
| 12/31/2008 | $120.00 | LENNI ELECTRIC CORPORAT | SEWER PLANT - GUY WIRE RELOCATE | |
| 12/29/2008 | $7,865.00 | MACANGA INC. | TRUCK & TRACKHOE RENTAL 12/5-12/18 | |
| 12/1/2008 | $2,466.00 | PATTERSON, MICHAEL J. | MATERIALS & LABOR - SPLIT RAIL FENCE | |
| 12/1/2008 | $4,907.72 | PIPE XPRESS INC. | COPPER TUBING, BRASS COMP. COUPLING | |
| 12/15/2008 | $813.74 | PIPE XPRESS INC. | BURIAL HYDRANT, BRASS CURB STOP, & | |
| 12/29/2008 | $129.00 | RAM-T CORPORATION | 2 FT. SILT FENCE | |
| 12/1/2008 | $1,183.00 | RANSOME RENTAL COMPAN | CATERPILLAR - TRUCK LOADER RENTAL | |
| 12/8/2008 | $3,960.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 11/13-11/25/08 | |
| 12/29/2008 | $908.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15 - 12/18/08 | |
| 12/31/2008 | $1,044.85 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15-12/16/08 | |
| 12/8/2008 | $119.95 | SAFETY SOLUTIONS INC. | MEDICAL SUPPLIES | |
| 12/1/2008 | $635.60 | US MUNICIPAL SUPPLY INC. | CUSTOM SIGNS - RIDLEY CREEK TREATMT | |
| 12/31/2008 | $157.50 | GAWTHROP GREENWOOD | LEGAL | |
| 1/31/2009 | $936.50 | GAWTHROP GREENWOOD | LEGAL | |
| 3/19/2009 | $1,246.64 | HAMMOND & MCCMLOSY | WATER SERVICE | |
| 3/31/2009 | $1,254.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/2/2009 | $274.21 | PIPE XPRESS INC. | YARD HYDRANT #2 | |
| 4/2/2009 | $1,910.28 | HAMMOND & MCCMLOSY | WATER PIPING | |
| 5/11/2009 | $158.69 | US MUNICIPAL SUPPLY INC. | 3 SIGNS | |
| 4/30/2009 | $264.86 | LENNI ELECTRIC CORPORA | 1WIRED HOT WATER HEATER | |
| 5/31/2009 | $133.00 | GAWTHROP GREENWOOD | LEGAL | |
| 6/30/2009 | $304.00 | GAWTHROP GREENWOOD | LEGAL | |
| 7/17/2009 | $1,481.00 | EAST GOSHEN TOWNSHIP | BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE) | |
| 9/10/2009 | $254.85 | AGWAY | TREE STAKES AND PEAT MOSS | |
| 8/25/2009 | $1,855.00 | HARMONY HILL NURSERIES | 16 TREES | |
| 8/31/2009 | $836.00 | GAWTHROP GREENWOOD | 2 MONTH LEGAL | |
| 11/19/2009 | $314.00 | VIMCO | SEALER FOR FLOORS | |
| 10/31/2009 | $285.00 | GAWTHROP GREENWOOD | LEGAL | |
| 12/31/2010 | $1,414.97 | L/B water | YARD HYDRANT #2 | |
| 12/18/2009 | $443.48 | Grainger | Hose Reel 1 inch | |
| 2/2/2010 | $267.98 | Grainger | Hose Reel 3/4 inch | |
| 2/28/2010 | $789.45 | Fisher Scientific | Lab Equipment | |
| 3/15/2010 | $57.00 | GAWTHROP GREENWOOD | LEGAL | |
| 3/31/2010 | $103.96 | Matthews Ford | Van rental | |
| 3/31/2010 | $275.50 | Grainger | Hose | |
| 4/7/2010 | $247.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/14/2010 | $70.15 | GREAT VALLEY LOCKSHOP | 6 locks | |
| 4/15/2010 | $641.98 | Grainger | Shelving | |
| 4/16/2010 | $1,127.48 | Continetal Fire & Safety | 3" & 1.75" Hose | |
| 3/17/2010 | $28.58 | Grainger | Phone | |
| 2/22/2010 | $1,092.01 | Water Pollution Biology | Michael Geradi - Talk | |
| 5/5/2010 | $1,104.50 | McNichols | Safety Grating | |
| 5/5/2010 | $1,078.38 | HAMMOND & MCCMLOSY | WATER LINE OFFICE | |
| 5/3/2010 | $270.10 | HAMMOND & MCCMLOSY | Hose fitting in storage room | |
| $2,329.17 | Fisher Scientific | DESICCATOR & OVEN |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
DETAIL
[Handwritten: 5 of 9]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 5/12/2010 | $1,485.63 | Fisher Scientific | FURNACE | |
| 5/21/2010 | $456.81 | USA Blue book | beakers | |
| 4/29/2010 | $258.00 | Marco | 3 10Lb dry Chem FX | |
| 5/9/2010 | $142.47 | Staples | office equipment | |
| 5/31/2010 | $1,862.00 | GAWTHROP GREENWOOD | Legal | |
| 5/15/2010 | $39,937.70 | Aqua Wastwwater Mgt | Sludge from DAVCO | |
| Total | $95,281.68 | $95,281.68 | ||
| Extras - Capital - Identified capital extras that have not been paid | ||||
| $20,396.00 | Driveway Restoration | |||
| $3,300.00 | Restoration of parking area | |||
| $50,000.00 | Paving at RCSTP (we received a credit from Worth) | |||
| Total | $73,696.00 | $73,696.00 | ||
| Trailer, Phone, Porta Potty & Internet | ||||
| 12/15/2008 | $1,039.10 | ACTON MOBILE INDUSTRIES | RENTAL MOBILE OFFICE | |
| 12/22/2008 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - THRU 1/19/09 | |
| 1/21/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 1/20-2/20/09 | |
| 2/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 2/20- 3/20/09 | |
| 3/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 3/20 - 4/19 | |
| 4/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 4/20 - 5/19 | |
| 5/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 5-20 - 6/19 | |
| 6/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 6/20 - 7/19 | |
| 7/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 7/20 to 8/19 | |
| 8/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 8/20 to | |
| 9/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | ||
| 10/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 11/19 | |
| 11/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 12/19 | |
| 12/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 1/19 | |
| 1/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 2/19/10 | |
| 2/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 3/19/10 | |
| 3/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 4/19 | |
| 4/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 5/19 | |
| 5/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 6/19 | |
| 6/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 7/19 | |
| $5,582.00 | $5,582.00 | |||
| 12/15/2008 | $140.00 | POTTY QUEEN | RENTAL PORTABLE TOILET - RIDLEY CRK | |
| 12/22/2008 | $64.47 | POTTY QUEEN | RENTAL TOILET 12/23-1/10/08 | |
| 2/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 2/8-3/7 | |
| 3/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 3/8-4/4 | |
| 4/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 4/5-5/2 | |
| 5/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET ???? | |
| 7/26/2009 | $95.00 | POTTY QUEEN | RENTAL 7/26 TO 8/22 | |
| 8/23/2009 | $95.00 | POTTY QUEEN | Rental 8/23 to 9/19 | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
DETAIL
[Handwritten: 6 of 9]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 9/20/2009 | $95.00 | POTTY QUEEN | RENTAL 9/20 to 10/17 | |
| 10/18/2009 | $95.00 | POTTY QUEEN | 10/18/09 to 11/14/09 | |
| 11/14/2009 | $95.00 | POTTY QUEEN | 11/15 to 12/13 | |
| 12/13/2009 | $95.00 | POTTY QUEEN | 12/13 to 1/9/10 | |
| 1/10/2010 | $95.00 | POTTY QUEEN | 1/10/10 to 2/6/10 | |
| 2/7/2010 | $95.00 | POTTY QUEEN | 2/7/10 to 3/6/10 | |
| 3/7/2010 | $95.00 | POTTY QUEEN | 3/7 to 4/3 | |
| 4/4/2010 | $95.00 | POTTY QUEEN | 4/4 to 5/1 | |
| 5/2/2010 | $98.80 | POTTY QUEEN | 5/2 to 5/29 | |
| 5/30/2010 | $96.90 | POTTY QUEEN | 5/30 to 6/26 | |
| $1,730.17 | $1,730.17 | |||
| 12/22/2008 | $174.65 | VERIZON -7041 | NOVEMBER 25 - DECEMBER 6, 2008 | |
| 1/7/2009 | $137.87 | VERIZON -7041 | BILLING DATE 1/07/09 | |
| 2/7/2009 | $130.34 | VERIZON -7041 | BILLING DATE 2/07/09 | |
| 3/7/2009 | $133.97 | VERIZON -7041 | BILLING DATE 3/7/09 | |
| 4/7/2009 | $136.00 | VERIZON -7041 | BILLING DATE 4/7/09 | |
| 5/7/2009 | $137.66 | VERIZON -7041 | BILLING DATE 5/7/09 | |
| 6/7/2009 | $178.47 | VERIZON -7041 | BILLINGDATE 6/7/2009 | |
| 7/7/2009 | $145.21 | VERIZON -7041 | Billing Date 7/7/09 | |
| 8/7/2009 | $134.44 | VERIZON -7041 | Billing Date 8/7/09 | |
| 9/7/2009 | $132.93 | VERIZON -7041 | billing date 9/7/09 | |
| 10/7/2009 | $133.43 | VERIZON -7041 | Billing date 10/7/09 | |
| 11/7/2009 | $133.79 | VERIZON -7041 | Billing Date 11/7/09 | |
| 12/7/2009 | $136.76 | VERIZON -7041 | Billing date 12/7/09 | |
| 1/7/2010 | $135.11 | VERIZON -7041 | Billing date 1/7/10 | |
| 2/7/2010 | $134.35 | VERIZON -7041 | Billing date 2/7/10 | |
| 3/7/2010 | $134.34 | VERIZON -7041 | Billing date 3/7/10 | |
| 4/7/2010 | $134.72 | VERIZON -7041 | Billing date 4/7/10 | |
| 5/7/2010 | $136.37 | VERIZON -7041 | billing ddate 5/7/2010 | |
| 6/7/2010 | $134.06 | VERIZON -7041 | Billing date 6/7/10 | |
| $2,654.47 | $2,654.47 | |||
| 8/31/2009 | $286.56 | VERIZON | INTERNET (FIRST BILL) | |
| 9/28/2009 | $69.99 | VERIZON | INTERNET | |
| 10/28/2009 | $69.99 | VERIZON | INTERNET | |
| 11/28/2009 | $69.99 | VERIZON | INTERNET | |
| 12/28/2009 | $69.99 | VERIZON | INTERNET | |
| 1/28/2010 | $69.99 | VERIZON | INTERNET | |
| 2/28/2010 | $69.99 | VERIZON | INTERNET | |
| 3/28/2010 | $69.99 | VERIZON | INTERNET | |
| 4/28/2010 | $69.99 | VERIZON | INTERNET | |
| 5/28/2010 | $69.99 | VERIZON | INTERNET | |
| $916.47 | $916.47 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
DETAIL
[Handwritten: 7 of 9]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| Trailer, Phone, Porta Potty & Internet Total | $10,883.11 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
DETAIL
[Handwritten: 8 of 9]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS
June 28, 2010
| Potential capital extras | Amount | Total |
|---|---|---|
| Pipe conduit Conflicts | $30,000 | |
| Controls | $10,000 | |
| Sludge room retrofit | $10,000 | |
| HVAC Thermostats | $5,000 | |
| Cathode Protection | $10,000 | |
| Treatment Tanks | $0 | |
| Electrician (increase in wages) | $20,000 | |
| UV Channel | $11,357 | |
| Total potential extras | $96,357 | $96,357 |
| Potential Receipts | Amount | Total |
|---|---|---|
| Total Potential Receipts | $0 | $0 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
POTENTIAL EXTRAS
[Handwritten: 9 of 9]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS
June 28, 2010
| NO. | AMOUNT | APPROVED | WORK | STATUS | PAID |
|---|---|---|---|---|---|
| WORTH | |||||
| 1 | $3,209.70 | 2/24/09 | BLOWER #1 REPAIR | APPROVED | NO |
| 4 | $5,542.80 | 5/11/09 | BLOWER #2 REPAIR | APPROVED | NO |
| ? | $4,617.08 | ??? | BLOWER #3 REPAIR | APPROVED | NO |
| 3 | $2,703.00 | 12/14/09 | ANTI-FLOT COLLAR | APPROVED | NO |
| 5 | $6,784.65 | 12/14/09 | LARGER MIXER FOR FLOC TANK | APPROVED | NO |
| 15 | $4,494.52 | 12/14/09 | REMOVABLE RAILS ON SBR TANK | APPROVED | NO |
| 17 | $6,126.78 | 3/8/10 | BLOWER #4 REPAIR | APPROVED | NO |
| 8 | -$6,250.00 | 3/8/10 | CREDIT FOR CAST IRON PIPE | APPROVED | NO |
| -$20,000.00 | 2/8/10 | Credit for Electric Wages | APPROVED | NO | |
| 9 | -$50,000.00 | 2/8/10 | Credit for paving | APPROVED | NO |
| 19 | $27,702.20 | 5/20/10 | air drops | APPROVED | NO |
| 20 | $3,516.77 | 5/20/10 | 2 doors | APPROVED | NO |
| 21 | $18,094.59 | 5/20/10 | walkways | APPROVED | NO |
| 22 | -$13,875.00 | 5/20/10 | Credit for concrete | APPROVED | NO |
| 24 | $5,932.27 | 6/14/10 | Additional block Sludge building | APPROVED | NO |
| Total | -$1,400.64 | ||||
| CLINGER | |||||
| Denied | EXTEND 34 KV LINES | DENIED | |||
| 1 | $5,106.00 | 7/1/09 | CORNER UNIT FOR MCC | APPROVED | NO |
| 2 | $23,585.00 | SERVICE DISCONNECT | APPROVED | NO | |
| 3 | $3,171.00 | 4/12/10 | Applebrook Pump | APPROVED | NO |
| Total | $31,862.00 | ||||
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 062810.xls
CHANGE ORDERS
[Handwritten: 3. RIDLEY CREEK INV 2. 1pg]
Pipe Xpress, Inc.
PO BOX 5088
West Chester, PA 19380-9998
610-918-7120
FAX 610-918-1328
APPROVED BY: ____________________
DATE PAID: ____________________
CHECK #: ____________________
CHARGED TO: 07424.7452
2010 JUL 1 PM 12 23
Invoice
| Date | Invoice # |
|---|---|
| 6/30/2010 | 47081 |
| Bill To | Ship To |
|---|---|
| EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
SAME AS BILLING ADDRESS 610 656 2742 DELIV: TUES 6/29 |
| P.O. No. | Terms | Due Date | Rep | Ship Date | Ship Via | Ordered |
|---|---|---|---|---|---|---|
| VERBAL | 2% 10 Net 30 | 7/30/2010 | 6/28/2010 | OUR TRUCK | MARK |
| Item | Description | Order... | Invoiced | Rate | Ship Date | Backordered | Amount |
|---|---|---|---|---|---|---|---|
| PE111520 | 1-1/2 X 20' PE3408 BLACK SDR11 160PSI PIPE | 40 | 40 | 1.20 | 0 | 48.00 | |
| PE06-15 | 1-1/2 PE SDR11 BLACK BF 90 ELL | 2 | 2 | 11.40 | 0 | 22.80 | |
| PE01-15 | 1-1/2 PE SDR11 BLACK BF TEE | 1 | 1 | 11.80 | 0 | 11.80 | |
| PE54-15 | 1-1/2 PE SDR11 BLACK FLANGE ADAPTER W/ BUR | 1 | 1 | 35.00 | 0 | 35.00 | |
| 854-15 | 1-1/2 PVC S80 VS FLANGE SOC | 1 | 1 | 7.08 | 0 | 7.08 | |
| FG15 | 1-1/2 NEOPRENE FF FLANGE GASKT 1/8 | 1 | 1 | 1.95 | 0 | 1.95 |
[Handwritten: Ridley Creek Expansion]
Thank you for your business.
| Subtotal | $126.63 |
|---|---|
| Sales Tax () | $0.00 |
| Total | $126.63 |
[Logo: GLV Great Valley Lockshop Inc.]
16 Church Road Malvern, PA 19355
610.644.5334 Fax 610.889.3837
Locks & Safes Installation & Service
Residential Commercial
www.gvlock.com
PA003524
APPROVED BY: [signature]
DATE PAID: ____________________
CHECK #: ____________________
CHARGED TO: 07424-7452
INVOICE
| DATE | NUMBER | CUST# |
|---|---|---|
| 6/15/2010 | 0000090474 | 0002016 |
| 67094 |
| BILL TO: | SHIP TO: |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester PA 19380 |
East Goshen Township 1580 Paoli Pike West Chester PA 19380 |
| P.O. NUMBER | TERMS | SALESMAN |
|---|---|---|
| NET 30 | Nick Vone |
| QUANTITY | DESCRIPTION | PRICE EACH | AMOUNT |
|---|---|---|---|
| sewer plant lab needs to be secured to new temp. kwikset key. | |||
| 1.00 | KW400CN3 Kwikset Cameron Entry Lock Brass | 43.00 | 43.00 |
| 20 % Discount on material | -8.60 | ||
| 12.00 | KEY1 Standard Brass Key Copied | 1.50 | 18.00 |
| 1.00 | LA25 Service Charge 1 Van and Tech. | 70.00 | 70.00 |
| 1.00 | LA27 Hourly Labor Charge .50 hours Min. | 60.00 | 60.00 |
| 2.00 | LA6 Standard Cylinder Ind. Rekeyed | 11.00 | 22.00 |
[Handwritten: RC]
| TOTAL | $204.40 |
|---|---|
| Due Date | 7/15/2010 |
Seller shall be entitled to collect all expenses on overdue payments including attorneys & court costs up to 20% principle and interest. 1 1/2 % finance charge over 30 days!
We honor Mfg. warranty on parts, labor warranty is 90 days, normal useage applies.
Visit Our Website to Learn the History of G.V.L. www.gvlock.com
2009 Marks Our Tenth Anniversary of Being Incorporated
TransForm Group 770-729-8585 770-729-9191 (fax)
[Logo: Steel]
O'Rourke and Sons, Inc.
992 S Bolmar Street
West Chester PA 19382
| Invoice | 163731 |
|---|---|
| Date | 6/8/2010 |
| Page | 1 |
| Order No# |
| Bill To: | Ship To: |
|---|---|
| EAST GOSHEN TOWNSHIP 1580 Paoli Pike WEST CHESTER PA 19380 |
Lot No# RIDLEY CREEK Delivery Date: 6/8/2010 EAST GOSHEN TOWNSHIP Public Works |
| Salesperson ID | Payment Terms | Customer ID | Shipping Method | Req Ship Date |
|---|---|---|---|---|
| Net 30 Days | 2796 | YARD PICKUP | 6/8/2010 |
| Ordered | Shipped | Description | Unit Price | Ext. Price |
|---|---|---|---|---|
| 1.00 | 1.00 | PUBLIC WORKS RIDLEY | $0.00 | $0.00 |
| 1.00 | 1.00 | CREEK | $0.00 | $0.00 |
| 1.00 | 1.00 | BEND THE CUSTOMERS | $150.00 | $150.00 |
| 1.00 | 1.00 | SUPPLIED STAINLESS | $0.00 | $0.00 |
| 1.00 | 1.00 | STEEL | $0.00 | $0.00 |
APPROVED BY: ____________________
DATE PAID: ____________________
CHECK #: ____________________
CHARGED TO: 07424-7452
| Subtotal | $150.00 |
|---|---|
| Misc | $0.00 |
| Tax | $0.00 |
| Freight | $0.00 |
| Trade Discount | $0.00 |
| Total | $150.00 |
[Logo: Pennoni ASSOCIATES INC. CONSULTING ENGINEERS]
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 442961
Invoice Date : 06/29/2010
Project : EGMA0707
Project Name : RCSTP Expansion
For Services Rendered through: 06/20/2010
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has includedworking with Operator regarding WWTP treatment performance; evaluation of grit accumulation in screen building; review air compressor demands and replacement equipment for Township; review of DAVCO floor elevations for change order credit; review/recommend resolution to top of masonry elevation conflict at sludge building; responses to Contractor RFIs; schedule reviews; and review/negotiations of change orders with Township and contractors.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Permit Design | est. $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. $133,200.00 | $111,105.48 | $129,006.73 | $17,901.25 | |
| Total : | $656,200.00 | $633,971.28 | $651,872.53 | $17,901.25 |
Amount Due This Invoice: $17,901.25
[Handwritten: OK RS 7-2]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary
Invoice Date 06-29-2010
Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 442961
Invoice Period: 5/17/2010 to 6/20/2010
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
|---|---|---|---|
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Changes: | $ 11,500.00 | Date: | 6/14/2010 |
| Contract Amount: | $ 656,200.00 | ||
| Previously Invoiced: | $ 633,971.28 | ||
| Current Invoice: | $ 17,901.25 | ||
| Invoiced to Date ($): | $ 651,872.53 | ||
| Invoiced to Date (%): | 99% | ||
| Remaining Budget ($): | $ 4,327.47 | ||
| Remaining Budget (%): | 1% |
Budget by Phase:
| Phase No. | 10 |
|---|---|
| Phase Name: | Continued Eng Svcs |
| Phase Budget: | $ 99,700.00 |
| Changes: | $ 33,500.00 |
| Contract Amount: | $ 133,200.00 |
| Previously Invoiced: | $ 111,105.48 |
| Current Invoice: | $ 17,901.25 |
| Invoiced to Date ($): | $ 129,006.73 |
| Invoiced to Date (%): | 97% |
| Remaining Budget ($): | $ 4,193.27 |
| Remaining Budget (%): | 4% |
Comments: Phase 10 - Continued Engineering Services
Construction meetings with contractors and Township; construction management; shop drawing and schedule review; and site observation of construction. Consultation with Township regarding same.
Additional effort this invoice period has included working with Operator regarding WWTP treatment performance; evaluation of grit accumulation in screen building; review air compressor demands and replacement equipment for Township; review of DAVCO floor elevations for change order credit; review/recommend resolution to top of masonry elevation conflict at sludge building; responses to Contractor RFIs; schedule reviews; and review/negotiations of change orders with Township and contractors.
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 95.75 | 31.00 | 126.75 |
| Senior Engineer | 284.50 | 19.75 | 304.25 |
| Senior Designer | 128.00 | 12.00 | 140.00 |
| Project Engineer | 84.00 | 23.25 | 107.25 |
| Associate Engineer | 7.00 | 0.00 | 7.00 |
| Graduate Engineer | 43.00 | 0.75 | 43.75 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 656.50 | 115.50 | 772.00 |
| Engineering Technician I | 13.50 | 11.75 | 25.25 |
| Administrative Assistant I | 0.50 | 0.00 | 0.50 |
| Totals | 1315.25 | 214.00 | 1529.25 |
[Logo: Pennoni ASSOCIATES INC. CONSULTING ENGINEERS]
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 442963
Invoice Date : 06/29/2010
Project : EGMA1000
Project Name : 2010 Annual Services
For Services Rendered through: 06/20/2010
Preparation and participation in monthly board meeting; review of potential soda ash feed system for RCSTP and consultation with Township.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 615.00
Expense : 0.00
Phase Total : 615.00
Amount Due This Invoice: $615.00
Fee : 10,000.00
Prior Billings : 7,529.50
Current Billings : 615.00
Total Billings : 8,144.50
Phase : **** -- Professional Services
| Labor Class |
Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 105.00 | 210.00 |
| Project Engineer | 4.50 | 90.00 | 405.00 |
| Labor Total: | 6.50 | 615.00 |
Total Phase : **** -- Professional Services
Labor : $615.00
Expense : $0.00
Total Project : EGMA1000 -- 2010 Annual Services
Labor : $615.00
Expense : $0.00
[Handwritten: OK RS 7-2]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1000 Invoice Summary
Invoice Date 06-29-2010
Project: 2010 Annual Services
Pennoni Job No.: EGMA 1000
Invoice No: 442963
Invoice Period: 5/17/2010 to 6/20/2010
| Initial Authorization: | $ 10,000.00 | Date: | 1/11/2010 |
|---|---|---|---|
| Changes: | $ - | Date: | |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 7,529.50 | ||
| Current Invoice: | $ 615.00 | ||
| Invoiced to Date ($): | $ 8,144.50 | ||
| Invoiced to Date (%): | 81% | ||
| Remaining Budget ($): | $ 1,855.50 | ||
| Remaining Budget (%): | 19% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2010 Annual Services |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 7,529.50 |
| Current Invoice: | $ 615.00 |
| Invoiced to Date ($): | $ 8,144.50 |
| Invoiced to Date (%): | 81% |
| Remaining Budget ($): | $ 1,855.50 |
| Remaining Budget (%): | 19% |
Comments: Preparation and participation in monthly board meeting and consultation with Township.
Review of potential soda ash feed system for RCSTP per Township Request.
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 14, 2010
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday June 14, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Joseph McCawley, and Michael Steinberger. Also in attendance were: Rick Smith, Township Manager; Dave Evans from Brickhouse Environmental; Evan Andrews, Authority Engineer; Bob Adams, Authority Solicitor; Carmen Battavio, Township Supervisor; and Megan Hedgecock, Planning Commission.
COMMON ACRONYMS:
| MA- Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lochwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. Jack announced there would be an executive session after the regular meeting.
2. RCSTP REPORTS
a. Brickhouse Report - Dave reported that commencement of Phase II of Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project progressed with the completion cleaning of the existing DAVCO treatment tanks. Aqua Wastewater Management, Inc. was contracted to remove and dispose of the sludge, grit and debris remaining in the treatment tanks after transfer of mixed liquor suspended solids (MLSS) to the new sequential batch reactors (SBRs). Demolition of existing main components included the removal of all lift station and forward flow EQ tank pumps, demolition of the previous influent lift stations, clarifier drive mechanisms and related equipment, aeration tank drop piping and diffusers and the up flow sand filters. Refurbishment of the existing DAVCO treatment tanks to serve as treated effluent flow equalization and sludge holding tanks was initiated. Progress during May and the first week of June included complete refurbishment of DAVCO treatment tank number one (1) and initiation of the sand blasting and painting. Substantial progress was completed towards the installation of the underground piping linking the SBR effluent piping to the existing DAVCO tanks. The new sludge dewatering building concrete floor was cast in place and the construction of the masonry walls commenced on June 10, 2010.
Operation of the SBRs and related equipment continued during the month. The manufacturer, Siemens, continued to coordinate with the Plant Operator to implement adjustments to the treatment plant system program and programmable logic controller ` (PLC). Regulatory compliance with the existing NPDES discharge permit for the month of
MA Minutes 06/14/2010
1
May is not expected as the result of slightly elevated ammonia as nitrogen concentrations in the effluent. Improvements towards nitrification and ammonia as N removal are anticipated as the treatment process and programmable set points are adjusted for actual site conditions.
Key administrative and contractual items completed during the month included the acceptance and approval of Worth & Company change orders 001, 002, and 003 by the Municipal Authority. Included as part of the change orders, the overall substantial completion date was extended from June 30, 2010 to July 13, 2010. The Authority received a response from Pennoni Associates, Inc. regarding the Clinger letters dated March 15, 2010 and April 30, 2010. A meeting with representatives from Clinger and Pennoni was scheduled for June 11, 2010 to develop a solution for presentation to the Authority.
b. Cost Summary – Rick reported that the grant money of $464,195.00 was received today.
c. Tank Cleaning – Mark reported that Aqua did a great job. There was more gallonage and sludge than expected.
RCSTP CHANGE ORDERS
A. Worth & Co., PCO24, $5,932.27. Joe moved to approve payment. Fran seconded the motion. This is to add additional courses of block to the existing walls to match the new elevation. A conveyor is under the centrifuge and space is about 8” short. The old walls are only 15’ high and need to be 16” high. The top will be made even. There was no further discussion or public comment. The motion passed unanimously.
3. RCSTP INVOICES
A. Hammond & McCloskey, #4513, 5/5/10, $1,078.38. Joe moved to approve payment. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
B. Hammond & McCloskey, #4523, 5/5/10, $270.10. Joe moved to approve payment. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
C. Pennoni, #440011, 5/25/10, $19,287.50. Mike moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
D. Fisher Scientific, #3461600, 4/26/10, $2,329.17 and #3781979, 5/12/10, $1,485.63. Joe moved to approve payment of both invoices. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
E. Aqua Wastewater Mgt., #161112, 5/15/10, $39,937.70. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
MA Minutes 06/14/2010
2
F. USA BlueBook, #155755, 5/21/10, $456.81. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
G. Gawthrop Greenwood, #79963, 5/31/10, $665.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
H. Gawthrop Greenwood, #79964, 5/31/10, $1,862.00. After discussion of this invoice and 2 other invoices shown on the Agenda, the original amount of $836.00 was amended to $1,862.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
I. Marco, #064873, 4/29/10, $258.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
J. Worth & Company, #P28001, 5/31/10, $178.290.62. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
4. CHAIRMAN’S REPORT
A.
5. APPROVAL OF MINUTES
A. Jack moved to approve the minutes of the May 10, 2010 regular meeting as corrected. Fran seconded the motion. The motion passed unanimously.
B. Jack moved to approve the minutes of the May 20, 2010 special meeting. Joe seconded the motion. The motion passed unanimously.
C. Fran moved to approve the minutes of the June 7, 2010 special meeting. Jack seconded the motion. The motion passed unanimously.
6. ENGINEER’S REPORT
Evan reported that Rick has the Lockwood and Hershey’s Mill reports. Marydell needs to go through local planning process..
7. APPROVAL OF INVOICES
A. General Fund reimbursement, Staples, 5/20/10, $142.47. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously
8. LIAISON REPORTS
A. Planning Commission – Megan reported that the Commission approved a sideyard set back for resident Muldry. The Commission recommended denial for Liberty requesting installation of 150’ high communications tower behind the Wawa on Paoli Pike. The Commission reviewed a sketch plan from New Kent Apartments to remove the retail
MA Minutes 06/14/2010
3
buildings and construct two new apartment buildings with 12 apartments in each one. This was the last meeting for Senya as a Commission member, since he is now a Supervisor. The vacancy on the Commission will probably be filled by Jim McRee
9. FINANCIAL REPORTS
Since there was some concern about the comments used on the latest reports, Rick clarified the use of the comments. Mike asked Rick to be sure about the corrected entries on the latest report.
10. GOALS
Jack commented that the completed items should be shown in BOLD lettering. He pointed out several items on the list that are done.
11. OLD BUSINESS
A. Chester Creek Sewage Collection System Modeling – Joe feels this should wait until it is mandated. No further action was taken at this time.
12. NEW BUSINESS
A. Mark reported that right now they use an old tank with a motor to process soda ash. The soda ash comes in once a day but gets clogged and requires additional work. Also, it creates a mess so it is a housekeeping problem. He asked permission to research the cost to purchase new equipment, possibly an Acrison Model W-105Z. The authority members approved his request.
B. Mark wants to purchase a smaller air compressor. He requested permission to research the cost. The authority members approved his request.
C. Outstanding Issues - Pennoni – At the May 10, 2010 meeting, the Authority authorized an additional $22,000 for construction services. Rick clarified that the current date for substantial completion is August 6, 2010. They are requesting another $22,000 to go through July. However, when the current invoice is paid, there will be a balance of $10,500.00. Joe moved to authorize $11,500.00 which, when added to the balance of $10,500.00, will give the requested $22,000. Mike seconded the motion. There was no further discussion. The motion passed unanimously.
Brickhouse – Joe moved to extend their contract 2 more months to October 8, 2010. Fran seconded the motion. Rick said there would be no change in cost. There was no further discussion. The motion passed unanimously.
13. CAPACITY REQUESTS
None
14. SEWER REPORTS
A. Mark Miller’s written report follows:
Meter: Meters were read on a daily basis. We continue to read the portable meters.
C.C. Collection – To date we have repaired 14 INI problems. I have spoken with two plumbers that have stated they have repaired seven sewers where they have found clean out pipes have separated. We believe this was caused by the frost during the winter.
MA Minutes 06/14/2010
4
[Handwritten top right: 5 of 5]
R.C. Collection – Two more repairs were made for INI.
Pumping Station: All pumping stations were cleaned. The stations were visited on a routine basis. We did experience a problem with the transducer at the Barkway Pumping Station.
Lockwood Plant: The plant was visited by the Public Works Department on a daily basis. The bar screen was cleaned. We did have a problem with one of the floating aerators. Lenni Electric was used to trouble shoot the meter.
Ridley Creek Plant: Was visited on a daily basis. Township personnel assisted the plant operator on an as-needed basis. We have had some minor problems with regards to equipment. Vendors have been very responsive during the start up.
Ridley Expansion: The wet well have been removed. The demolition of the sludge room has been completed. Worth & Company has completed the demotion of equipment on the two tanks. They are installing the new piping in the tanks. The new walls in the sludge room are going up.
Township personnel removed the Roto mat and pumps from the wet well and Eq tank. I have contacted several of our vendors to let them know this equipment is for sale.
The Transducers and mag meters were removed. These can be used at our pumping stations.
PA One Calls: We received 74 PA One calls for the month of May.
Alarms – 12 alarms for the month of May
B. May 2010 Operations Reports from Artesian regarding Ridley Creek and Lochwood Chase were received.
15. ANY OTHER MATTER
None
16. CORRESPONDENCE
None
17. PUBLIC COMMENT
None
19. ADJOURNMENT
There being no further business, Fran moved to adjourn the meeting. Mike seconded the motion. There was no further discussion or public comment. The motion passed unanimously. The public meeting was adjourned at 8:15 p.m. The Authority went into Executive Session.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 06-14-10 DRAFT.doc
MA Minutes 06/14/2010 5
[Handwritten top right: 6. ENGINEER'S REPORT
a.
2 pgs]
EGMA 1000
Pennoni
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Evan R. Andrews, P.E.
Authority Engineer
DATE: July 7, 2010
SUBJECT: Engineer’s Report
RCSTP Upgrade and Expansion
- Construction phase services continue including: progress meetings with the Contractors and Township every other Thursday; observation services continue including coordination and communication with Brickhouse and the Township; receipt, review, and return of Contractor submittals; negotiation, review, and approval of Payment Requests.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail.
- An estimate of Pennoni effort to observe the remaining construction, start-up activities, contract close-out, and as-built drawing preparation is being provided separately. The estimate is based on a substantial completion date of August 20, 2010.
RCSTP Soda Ash System
- Pennoni has been investigating the Acrison dry chemical feed system for possible application at the RCSTP. Cost data from the vendor arrived today (7/7/10) and is being reviewed for discussion at the Board meeting.
I/I Metering Project
- The Township continues to meter flows at selected locations. Metering data is being reviewed for the period of March through June and additional detail will be available at the Board meeting.
Ridley Creek Consent Order
- The third Semi-Annual Report was prepared and submitted to DEP on March 26, 2010 as required by the CO&A. The next report is due to DEP by September 30, 2010 and will address comments received from Mr. Goldberg on 6/8/2010.
Page 1 of 2
G:\PROJECTS\EGMA\Memos to Board\Memo to EGMA Board 2010-07-07.doc
[Handwritten top right: 2 of 2]
EGMA 1000
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- These documents were provided to the Township for submittal to DEP.
Marydell PS Elimination Planning
- The notification letters (Component 4) and associated documents are being prepared for distribution this month to planning and health department for their review and comment.
Page 2 of 2
G:\PROJECTS\EGMA\Memos to Board\Memo to EGMA Board 2010-07-07.doc
15 SEWER REPORTS b 6 pgs
2008 FLOWMETERS
2010 JUNE 2ND QUARTER
| Precip Inches | DATE | WESTTOWN WAY (1000) READING | WESTTOWN WAY (1000) GPD | ELLIS LANE (10) READING | ELLIS LANE (10) GPD | PAOLI PIKE (10) READING | PAOLI PIKE (10) GPD | WILSON DRIVE (10) READING | WILSON DRIVE (10) GPD | SUMMIT GPD | NET FLOWS | DATE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.04 | 06/01/10 | 1,674,921 | 1,170,000 | 14,082,247 | 175,333 | 7,853,282 | 81,148 | 8,971,096 | 45,658 | 20,400 | 867,863 | 06/01/10 |
| 0.00 | 06/02/10 | 1,676,176 | 1,255,000 | 14,095,419 | 131,720 | 7,861,595 | 83,130 | 8,978,264 | 71,680 | 20,400 | 968,470 | 06/02/10 |
| 0.11 | 06/03/10 | 1,678,590 | 2,414,000 | 14,106,729 | 113,100 | 7,877,994 | 163,990 | 8,991,950 | 136,860 | 20,400 | 2,000,050 | 06/03/10 |
| 0.00 | 06/04/10 | 20,400 | 0 | 06/04/10 | ||||||||
| 0.00 | 06/05/10 | 20,400 | 0 | 06/05/10 | ||||||||
| 0.00 | 06/06/10 | 20,400 | 0 | 06/06/10 | ||||||||
| 0.00 | 06/07/10 | 1,682,059 | 867,250 | 14,138,268 | 78,848 | 7,902,546 | 61,380 | 9,006,749 | 36,998 | 20,400 | 690,025 | 06/07/10 |
| 0.00 | 06/08/10 | 1,683,225 | 1,166,000 | 14,150,630 | 123,620 | 7,910,550 | 80,040 | 9,012,024 | 52,750 | 20,400 | 909,590 | 06/08/10 |
| 0.68 | 06/09/10 | 1,684,381 | 1,156,000 | 14,162,545 | 119,150 | 7,918,380 | 78,300 | 9,017,568 | 55,440 | 20,400 | 903,110 | 06/09/10 |
| 0.00 | 06/10/10 | 1,685,630 | 1,249,000 | 14,176,246 | 137,010 | 7,926,994 | 86,140 | 9,023,985 | 64,170 | 20,400 | 961,680 | 06/10/10 |
| 0.00 | 06/11/10 | 1,686,789 | 1,159,000 | 14,188,334 | 120,880 | 7,934,953 | 79,590 | 9,030,015 | 60,300 | 20,400 | 898,230 | 06/11/10 |
| 0.00 | 06/12/10 | 20,400 | 0 | 06/12/10 | ||||||||
| 0.92 | 06/13/10 | 20,400 | 0 | 06/13/10 | ||||||||
| 0.00 | 06/14/10 | 1,690,354 | 1,188,333 | 14,227,237 | 129,677 | 7,959,825 | 82,907 | 9,043,984 | 46,563 | 20,400 | 929,187 | 06/14/10 |
| 0.00 | 06/15/10 | 1,691,587 | 1,233,000 | 14,240,278 | 130,410 | 7,967,700 | 78,750 | 9,050,220 | 62,360 | 20,400 | 961,480 | 06/15/10 |
| 0.07 | 06/16/10 | 1,692,785 | 1,198,000 | 14,253,492 | 132,140 | 7,976,842 | 91,420 | 9,058,170 | 79,500 | 20,400 | 894,940 | 06/16/10 |
| 0.00 | 06/17/10 | 1,693,952 | 1,167,000 | 14,264,983 | 114,910 | 7,982,367 | 55,250 | 9,064,240 | 60,700 | 20,400 | 936,140 | 06/17/10 |
| 0.00 | 06/18/10 | 1,695,099 | 1,147,000 | 14,277,919 | 129,360 | 7,988,878 | 65,110 | 9,071,646 | 74,060 | 20,400 | 878,470 | 06/18/10 |
| 0.00 | 06/19/10 | 20,400 | 0 | 06/19/10 | ||||||||
| 0.00 | 06/20/10 | 20,400 | 0 | 06/20/10 | ||||||||
| 0.00 | 06/21/10 | 1,698,352 | 1,084,333 | 14,316,484 | 128,550 | 8,008,284 | 64,687 | 9,088,610 | 56,547 | 20,400 | 834,550 | 06/21/10 |
| 0.05 | 06/22/10 | 1,699,502 | 1,150,000 | 14,329,730 | 132,460 | 8,014,659 | 63,750 | 9,096,559 | 79,490 | 20,400 | 874,300 | 06/22/10 |
| 0.00 | 06/23/10 | 1,700,652 | 1,150,000 | 14,342,615 | 128,850 | 8,020,982 | 63,230 | 9,105,998 | 94,390 | 20,400 | 863,530 | 06/23/10 |
| 0.00 | 06/24/10 | 20,400 | 0 | 06/24/10 | ||||||||
| 0.00 | 06/25/10 | 20,400 | 0 | 06/25/10 | ||||||||
| 0.00 | 06/26/10 | 20,400 | 0 | 06/26/10 | ||||||||
| 0.00 | 06/27/10 | 20,400 | 0 | 06/27/10 | ||||||||
| 0.00 | 06/28/10 | 20,400 | 0 | 06/28/10 | ||||||||
| 0.00 | 06/29/10 | 1,707,110 | 1,076,333 | 14,418,399 | 126,307 | 8,058,029 | 61,745 | 9,175,869 | 116,452 | 20,400 | 771,830 | 06/29/10 |
| 0.00 | 06/30/10 | 20,400 | 0 | 06/30/10 | ||||||||
| 2.87 | 1,225,309 | 126,607 | 78,857 | 70,230 | 20,000 |
| Metric | DAILY LOC | INQUIRER | EG TWP |
|---|---|---|---|
| MONTH TO DATE | 2.87 | ||
| NORMAL MONTH TO DATE | |||
| YEAR TO DATE | 31 | ||
| NORMAL YEAR TO DATE |
f/data/users/joanne/2003 flowmeters | 7/7/20109:35 AM
[Handwritten top right: 2 of 6]
2008 FLOWMETERS
2010 JUNE 2ND QUARTER
| HERSHEY'S MILL 10 |
ASHBRIDGE 100 |
HICKS METER 10 |
RESERVOIR 10 |
SHERMAN 10 |
BARKWAY 10 |
||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 19,015,391 | 58,960 | 849,691 | 74,000 | 9,634,579 | 299,378 | 97,018,986 | 735,975 | 362,698 | 5,173 | 1,546,497 | 11,303 |
| 19,021,487 | 60,960 | 850,419 | 72,800 | 9,672,968 | 383,890 | 97,102,484 | 834,980 | 363,256 | 5,580 | 1,547,660 | 11,630 |
| 19,032,879 | 113,920 | 851,787 | 136,800 | 9,746,534 | 735,660 | 97,264,273 | 1,617,890 | 364,466 | 12,100 | 1,549,795 | 21,350 |
| 19,050,230 | 43,378 | 853,873 | 52,150 | 9,839,088 | 231,385 | 97,487,522 | 558,123 | 366,173 | 4,268 | 1,553,231 | 8,590 |
| 19,055,913 | 56,830 | 854,543 | 67,000 | 9,873,370 | 342,820 | 97,564,625 | 771,030 | 366,785 | 6,120 | 1,554,272 | 10,410 |
| 19,061,254 | 53,410 | 855,203 | 66,000 | 9,906,333 | 329,630 | 97,640,347 | 757,220 | 367,372 | 5,870 | 1,555,351 | 10,790 |
| 19,066,939 | 56,850 | 855,934 | 73,100 | 9,943,046 | 367,130 | 97,723,490 | 831,430 | 367,982 | 6,100 | 1,556,537 | 11,860 |
| 19,072,598 | 56,590 | 856,610 | 67,600 | 9,980,208 | 371,620 | 97,804,650 | 811,600 | 368,608 | 6,260 | 1,557,568 | 10,310 |
| 19,089,954 | 57,853 | 858,773 | 72,100 | 10,070,698 | 301,633 | 98,027,264 | 742,047 | 370,324 | 5,720 | 1,560,794 | 10,753 |
| 19,095,362 | 54,080 | 859,559 | 78,600 | 10,106,819 | 361,210 | 98,108,076 | 808,120 | 370,857 | 5,330 | 1,561,827 | 10,330 |
| 19,102,533 | 71,710 | 10,151,732 | 449,130 | 98,190,536 | 824,600 | 371,519 | 6,620 | 1,563,286 | 14,590 | ||
| 19,105,968 | 34,350 | 860,911 | 67,600 | 10,178,884 | 271,520 | 98,262,926 | 723,900 | 371,838 | 3,190 | 1,564,010 | 7,240 |
| 19,111,360 | 53,920 | 861,558 | 64,700 | 10,213,188 | 343,040 | 98,337,199 | 742,730 | 372,323 | 4,850 | 1,565,039 | 10,290 |
| 19,127,490 | 53,767 | 863,497 | 64,633 | 10,298,095 | 283,023 | 98,542,074 | 682,917 | 373,792 | 4,897 | 1,568,020 | 9,937 |
| 19,132,683 | 51,930 | 864,139 | 64,200 | 10,331,904 | 338,090 | 98,616,480 | 744,060 | 374,349 | 5,570 | 1,569,025 | 10,050 |
| 19,137,612 | 49,290 | 864,770 | 63,100 | 10,366,037 | 341,330 | 98,690,567 | 740,870 | 374,902 | 5,530 | 1,570,047 | 10,220 |
| 19,170,456 | 54,740 | 868,338 | 59,467 | 10,522,426 | 260,648 | 99,119,300 | 714,555 | 378,192 | 5,483 | 1,576,431 | 10,640 |
| 57,796 | 67,285 | 353,596 | 802,473 | 5,804 | 11,194 | ||||||
f/data/users/joanna/2003 flowmeters
7/7/20109:35 AM
3 of 6
June Precip. 2.87 - 2010
Bar chart showing daily precipitation (snow/rain) in June 2010 across categories 1 through 34 on the horizontal axis and Precip. (0 to 3.5) on the vertical axis. Non-zero bars appear at 2 (~0.04), 4 (~0.11), 10 (~0.68), 14 (~0.92), 17 (~0.07), 23 (~0.05), 25 (~0.95), 28 (~0.05), and 34 (total 2.87).
- Y-axis (Precip.): 0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5
- X-axis (snow/rain): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
4 of 6
Monthly Totals 2010 (Jan-Dec)
3D bar chart showing Monthly Totals of precipitation for 2010 across Months 1 through 12 on the horizontal axis and Precip. (0 to 9) on the vertical axis. Bars are plotted for Month 1 (~3.3), Month 2 (~8.6), Month 3 (~7.7), Month 4 (~4.5), Month 5 (~5.0), and Month 6 (~2.9), with Months 7 through 12 at 0.
- Legend: Monthly Totals
- Y-axis (Precip.): 0, 1, 2, 3, 4, 5, 6, 7, 8, 9
- X-axis (Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
5 of 6
Flowmeters June 2010
Line graph showing daily flowmeter readings (Flow#s) for June 2010 across Days of the Month 1 through 30 on the horizontal axis and Flow#s (0 to 2500000) on the vertical axis. Values peak at 2,000,050 on day 3, drop to 0 on days 4–6, 12–13, 19–20, 24–28, and 30, and range between approximately 690,000 and 968,000 on active reading days.
- Legend: June
- Y-axis (Flow#s): 0, 500000, 1000000, 1500000, 2000000, 2500000
- X-axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
Monthly Totals 2010 Jan-Dec
Bar chart showing daily flowmeter totals grouped by month from January through December 2010, with Flowmeters (0 to 2500000) on the vertical axis and Month (January through December) on the horizontal axis. Bars are populated for January, February, March, April, May, and June, while July through December have no data plotted.
- Y-axis (Flowmeters): 0, 500000, 1000000, 1500000, 2000000, 2500000
- X-axis (Month): January, February, March, April, May, June, July, August, September, October, November, December
[Handwritten top right: 17. CORRESPONDENCE
a.
3 pgs]
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 16, 2010
Ms. Kelly Sweeny
Water Management
PA Department of Environmental Protection
2 E. Main St.
Norristown, PA 19401
RE: Act 537 Plan
Hershey’s Mill and Reserve Pump Stations
East Goshen Township
Dear Kelly:
At their meeting on June 15, 2010, the Board of Supervisors adopted Resolution 10-105 concerning the Hershey Mill Pump Station and Resolution 10-108 concerning the Reserve Pump Station 10-108 approving the enclosed Act 537 Plan Revision.
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[Signature: Rick Smith]
Louis F. Smith, Jr.
Township Manager
Cc: Evan Andrews, PE.
East Goshen Municipal Authority ✓
F:\Data\Shared Data\ABC'S\Municipal Authority\Projects\Hershey's Mill & The Reserve Pump Stations\Act 537 Plan\Letter to DEP 061610.doc
[Handwritten top right: 2 of 3]
RESOLUTION FOR PLAN REVISION 10-105
RESOLUTION OF THE SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA (hereinafter “the municipality”).
WHEREAS, Section 5 of the Act of January 24, 1966, P.L. 1535, No. 537, known as the “Pennsylvania Sewage Facilities Act,” as amended, and the Rules and Regulations of the Department of Environmental Protection (Department) adopted there under, Chapter 71 of Title 25 of the Pennsylvania Code, requires the municipality to adopt an Official Sewage Facilities Plan providing for sewage services adequate to prevent contamination of waters and/or environmental health hazards with sewage wastes, and to revise said plan whenever it is necessary to meet the sewage disposal needs of the municipality, and
WHEREAS, Pennoni Associates Inc. has prepared an Update Revision to the East Goshen Township Act 537 Plan which provides for sewage facilities to divert flow from the Hershey Mill and Reserve Pump Stations from the Township’s Chester Creek sewage collection system to the Township’s Ridley Creek sewage collection system, and
The alternative of choice to be implemented is diversion of the force main from the Hershey Mill Pump Station to the existing gravity sewer at Cornwallis Drive. The key implementation activities/dates include the following:
| Milestone | Date |
|---|---|
| Submit Update Revision to PaDEP | June 2010 |
| PaDEP Approval of Update Revision | November 2010 |
| Design of the Diversion | May 2011 |
| PaDEP Approval of WQM Part II | August 2011 |
| Public Bidding and Construction Contract Award | October 2011 |
| Start Construction | November 2011 |
| Complete Construction | February 2012 |
WHEREAS, East Goshen Township finds that the Facility Plan described above conforms to applicable zoning, subdivision, other municipal ordinances and plans and to a comprehensive program of pollution control and water quality management.
NOW, THEREFORE, BE IT RESOLVED that the Supervisors of the Township of East Goshen hereby adopt and submit to the Department of Environmental Protection for its approval as a revision to the “Official Plan” of the municipality, the above referenced Facility Plan. The municipality hereby assures the Department of the complete and timely implementation of the said plan as required by law (Section 5, Pennsylvania Sewage Facilities Act as amended).
I, Louis F. Smith, Township Manager, East Goshen Township, hereby certify that the foregoing is a true copy of Resolution No. 10-105, adopted 6-15, 2010
AUTHORIZED SIGNATURE
[Signature: Louis F. Smith, Jr.]
MUNICIPAL SEAL
[Handwritten top right: 3 of 3]
RESOLUTION FOR PLAN REVISION 10-108
RESOLUTION OF THE SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA (hereinafter “the municipality”).
WHEREAS, Section 5 of the Act of January 24, 1966, P.L. 1535, No. 537, known as the “Pennsylvania Sewage Facilities Act,” as amended, and the Rules and Regulations of the Department of Environmental Protection (Department) adopted there under, Chapter 71 of Title 25 of the Pennsylvania Code, requires the municipality to adopt an Official Sewage Facilities Plan providing for sewage services adequate to prevent contamination of waters and/or environmental health hazards with sewage wastes, and to revise said plan whenever it is necessary to meet the sewage disposal needs of the municipality, and
WHEREAS, Pennoni Associates Inc. has prepared an Update Revision to the East Goshen Township Act 537 Plan which provides for sewage facilities to divert flow from the Hershey Mill and Reserve Pump Stations from the Township’s Chester Creek sewage collection system to the Township’s Ridley Creek sewage collection system, and
The alternative of choice to be implemented for the Reserve Pump Station is the abandonment of the Reserve Pump Station and construction of a gravity sewer to the existing gravity sewer at Forest Lane. The key implementation activities/dates include the following:
| Milestone | Date |
|---|---|
| Submit Update Revision to PaDEP | June 2010 |
| PaDEP Approval of Update Revision | November 2010 |
| Design of the Diversion | February 2011 |
| PaDEP Approval of WQM Part II | May 2011 |
| Public Bidding and Construction Contract Award | July 2011 |
| Start Construction | August 2011 |
| Complete Construction | December 2011 |
WHEREAS, East Goshen Township finds that the Facility Plan described above conforms to applicable zoning, subdivision, other municipal ordinances and plans and to a comprehensive program of pollution control and water quality management.
NOW, THEREFORE, BE IT RESOLVED that the Supervisors of the Township of East Goshen hereby adopt and submit to the Department of Environmental Protection for its approval as a revision to the “Official Plan” of the municipality, the above referenced Facility Plan. The municipality hereby assures the Department of the complete and timely implementation of the said plan as required by law (Section 5, Pennsylvania Sewage Facilities Act as amended).
I, Louis F. Smith, Township Manager, East Goshen Township, hereby certify that the foregoing is a true copy of Resolution No. 10-108, adopted 6-15, 2010
AUTHORIZED SIGNATURE
[Signature: Louis F. Smith, Jr.]
MUNICIPAL SEAL
[Handwritten top right: 17. CORRESPONDENCE
b
2 pgs]
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 16, 2010
Ms. Kelly Sweeny
Water Management
PA Department of Environmental Protection
2 E. Main St.
Norristown, PA 19401
RE: Act 537 Plan
Lockwood Abandonment
East Goshen Township
Dear Kelly:
At their meeting on June 15, 2010, the Board of Supervisors adopted Resolution 10-106 approving the enclosed Act 537 Plan Revision.
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[Signature: Rick Smith]
Louis F. Smith, Jr.
Township Manager
Cc: Evan Andrews, PE.
East Goshen Municipal Authority ✓
F:\Data\Shared Data\ABC'S\Municipal Authority\Projects\Lockwood Abandonment\Letter to DEP 061610.doc
[Handwritten top right: 2 of 2]
RESOLUTION FOR PLAN REVISION 10-106
RESOLUTION OF THE SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA (hereinafter “the municipality”).
WHEREAS, Section 5 of the Act of January 24, 1966, P.L. 1535, No. 537, known as the “Pennsylvania Sewage Facilities Act,” as amended, and the Rules and Regulations of the Department of Environmental Protection (Department) adopted there under, Chapter 71 of Title 25 of the Pennsylvania Code, requires the municipality to adopt an Official Sewage Facilities Plan providing for sewage services adequate to prevent contamination of waters and/or environmental health hazards with sewage wastes, and to revise said plan whenever it is necessary to meet the sewage disposal needs of the municipality, and
WHEREAS, Pennoni Associates Inc. has prepared an Update Revision to the East Goshen Township Act 537 Plan which provides for the elimination of the Lockwood Chase Sewage Treatment Plant with the diversion of sewage flow to the existing Township Chester Creek collection system, and
The alternative of choice to be implemented is diversion of the Lockwood Chase gravity sewer system to the existing gravity sewer at Tanglewood Drive and the abandonment of the Lockwood Chase Sewage Treatment Plant. The key implementation activities/dates include the following:
| Milestone | Date |
|---|---|
| Submit Update Revision to PaDEP | June 2010 |
| PaDEP Approval of Update Revision | December 2010 |
| Design of the Diversion | March 2011 |
| PaDEP Approval of WQM Part II | June 2011 |
| Public Bidding and Construction Contract Award | August 2011 |
| Start Construction | September 2011 |
| Complete Construction | February 2012 |
WHEREAS, East Goshen Township finds that the Facility Plan described above conforms to applicable zoning, subdivision, other municipal ordinances and plans and to a comprehensive program of pollution control and water quality management.
NOW, THEREFORE, BE IT RESOLVED that the Supervisors of the Township of East Goshen hereby adopt and submit to the Department of Environmental Protection for its approval as a revision to the “Official Plan” of the municipality, the above referenced Facility Plan. The municipality hereby assures the Department of the complete and timely implementation of the said plan as required by law (Section 5, Pennsylvania Sewage Facilities Act as amended).
I, Louis F. Smith, Township Manager, East Goshen Township, hereby certify that the foregoing is a true copy of Resolution No. 10-106, adopted 6-15, 2010
AUTHORIZED SIGNATURE
[Signature: Louis F. Smith, Jr.]
MUNICIPAL SEAL
[Handwritten top right: 7. SEWER REPORT
C.
2 pgs]
ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company | Artesian Wastewater Management | Artesian Utility Development | Artesian Water Pennsylvania
Artesian Water Maryland | Artesian Wastewater Maryland | Artesian Consulting Engineers
July 7, 2010
Mr. Mark Miller
Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Ridley Creek Wastewater Treatment Facility
June 2010 Operations Report
Dear Mr. Miller:
The following is the June 2010 monthly operations report for East Goshen Township’s Ridley Creek Wastewater Treatment Facility.
Treatment plant operations were normal during the month of June with the new facility still experiencing some operational issues, which are expected during the startup phase. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 7,432,000 gallons, which represents an average daily flow of 247,733 gallons per day.
The influent area operated normally during the month. The muffin monster and influent screen were in service continuously and no problems were experienced with the units or their controls. Debris generated by the screens was disposed of via trash bags into the dumpster. Soda ash continued to be added on a daily basis to adjust and control pH and alkalinity values. The three (3) raw lift pumps and associated controls experienced no operational problems. The grit accumulation problem occurring in the influent channel prior to the muffin monster continued to be an issue during the month of June. The plant operator manually hosed and flushed the build-up through the area.
The Sequential Batch Reactors (SBRs) were on line and being adjusted as part of startup procedures during the month. Units #1, #3, and #4 were in service treating waste. Water white unit #2 was off line and being used as a temporary sludge holding tank until Phase 2 work is completed. The SBR units in service are working and producing a good quality effluent, although problems with maintaining adequate dissolved oxygen levels in the aerated fill and react cycles continues. The plant operator is working with the Siemens Representative to introduce new set points into the system in an effort to solve the problem. Additionally, during the month of June, some problems were found and corrected in the system’s program. These corrections have allowed sludge wasting to be accomplished in a more controlled manner. Dissolved oxygen graphing/trending, although not provided as part of our package, would be
664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com
[Handwritten top right: 2 of 2]
very helpful in continuously monitoring dissolved oxygen levels throughout all the phases in each SBR to visually see when and where levels are too low.
The disc filters were in service continuously throughout the month of June. Some alarms were triggered due to the level of water being too low for backwashing. These alarms were reset and the systems were returned to normal service without problems. The valve change outs and the high level float adjustments made last month have allowed the filters to work extremely well with less than perfect water quality and changing flow rates.
The ultraviolet light disinfection system operated normally during the month of June. There were only a few low intensity alarms, which were caused by poor water quality. These alarms were reset and the unit was easily returned to normal operations.
During the month of June, the plant did experience one (1) major electrical failure in the blower #3 control panel. The failure was identified by Clinger Electric and General Electric is scheduled to inspect/repair the damaged components. As a result of the failure the plant operator was required to place the spare blower into service in the #3 position. This was done but an additional power surge on June 24th caused the control computer to drop the blower out of position resulting in SBR #3 not being aerated for approximately thirty six (36) hours and going septic. Once the problem was identified and corrected, the plant released a septic odor for another day and treatment in SBR #3 was negatively affected. To date, the plant operator is still working to restore water quality in SBR #3 back to normal.
Work on Phase 2 construction continued during the month. The DAVCO rehabilitation and the centrifuge building construction are proceeding well. Additional work around the plant is proceeding as well. One (1) area of concern is the alum feed system to the SBR’s, which is not getting completed as quickly as the operator would like to allow for more control of water quality leaving the SBR units.
Results of influent and final effluent samples collected during the month indicate compliance with the existing final effluent permit limitations.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
[Signature: Tom Horrex / L.F.]
Tom Horrex
Treatment Plant Operator
C Mr. Evan Andrews – Pennoni Associates
2
[Stamp: FYI]
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 22, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Schaffer Properties, LLC and The Food Source International, Inc. has submitted a Conditional Use application with the Township for the property at 734 N. Chester Rd., (The Tory Inne). The applicant is applying to adaptively reuse the existing building as a business office, in accordance with §240-38.5.A(3) of the Township Code.
Pursuant to Township policy, all property owners within 1000 feet of the subject property are notified of these types of applications. The tentative dates and times upon which this application will be discussed are as follows; and are subject to change.
July 6, 2010 - Board of Supervisors meeting @ 8:00 pm (workshop @ 7 pm)
The Board of Supervisors will consider a request from the applicant for a waiver from the Historic Impact Study requirement of the Township Code.
July 7, 2010 - Planning Commission meeting @ 7:30 pm (workshop @ 7 pm)
(Applicant’s presentation)
July 8, 2010 - Historic Commission meeting @ 7:30 pm
July 21, 2010 - Planning Commission workshop session @ 7:30
August 3, 2010 - Board of Supervisors meeting @ 8:00 pm (workshop @ 7 pm)
(Conditional Use Hearing)
All meetings and workshops are held at the Township Building and are open to the public. The Conditional Use application is available for review during normal business hours. Please give me a call at 610-692-7171 if you have any questions or need additional information.
Sincerely,
[Signature: Mark Gordon]
Mark A. Gordon
Township Zoning Officer
cc: Board of Supervisors
Planning Commission
Historical Commission
F:\Data\Shared Data\Property Management\53-4\53-4-82 (734 N Chester)\Adaptive Re-Use CU 2010\Adapt. reuse CU 1000 ft ltr 06212010.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 30, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Hankin Family Limited Partnership has submitted a Land Development application for the New Kent Apartment Community, located on Boot Road in West Chester, PA 19380. The applicant proposes to construct two additional, 12 Unit, apartment buildings in place of the current commercial facilities, pursuant to §240-29 and §205 of the Township Code.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Land Development Applications.
The meeting dates and times scheduled for the review and discussion of this application are outlined below, and are subject to change.
July 7, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm) (Presentation of Application)
August 4, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
August 17, 2010 - Board of Supervisors meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)
All meetings are held at the Township Building and are open to the public. The application and plans are available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[Signature: Mark Gordon]
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-4\53-4-76 (New Kent Apts.)\2010 Land Development\1000 foot notification letter LD 06302010.doc
PMAA
PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION
1000 North Front Street, Suite 401 Wormleysburg, PA 17043
717-737-7655 • 717-737-8431(Fax)
www.municipalauthorities.org • info@municipalauthorities.org
TO: PMAA Member Authorities
FROM: Douglas E. Bilheimer
Executive Director
DATE: June 28, 2010
The PMAA Board of Directors’ voted April 18, 1994, to implement, by its resolution, certain administrative recommendations set forth by the PMAA By-Law Revision Committee. These do not require prior amendment of the By-Laws because, the existing By-Laws (Article IX, Sections 1 and 2) do provide the basic authorization for voting at meetings: one vote per active member to be cast by a delegate chosen by its own board of directors. The procedures approved by the Board are as follows:
- Fifteen days before the meeting, each member authority will notify the Executive Director of the name of its official voting at the meeting and also the name of an alternate delegate, both of whom have been approved by the members’ Board of Directors. The delegates shall either be an elected or an appointed official of the applicable authority.
- As part of the registration procedure at the Annual Meeting, the named delegate shall be handed a “card”, which he or she may hold up to cast the vote of that authority. It shall be the responsibility of each delegate, in the event he or she is not on the floor, to hand the card to the appropriate alternate delegate.
- The presiding officer at the Annual Meeting shall have the discretion in each vote to designate voting by voice, by a show of delegate cards, or by written ballot, unless upon motion duly made and adopted the Body itself votes to require written ballots.
- In pursuance of the powers of the presiding officer, the President may designate a time limit for floor remarks by each person speaking, which shall be stated by the presiding officer at the opening of the meeting.
Please note, this form does not need returned to our office if no one from your authority is attending the conference.
DEB/kaw
Attachment
Notification of Voting Delegate & Alternate
Our Authority’s Board of Directors hereby name the following individuals to serve as Voting Delegate and Alternate Delegate:
Voting Delegate
Name: __________________________________________________
Title: __________________________________________________
Alternate Delegate
Name: __________________________________________________
Title: __________________________________________________
Authority submitting this information:
Authority: __________________________________________________
Address: __________________________________________________
City: ___________________________ State: ________ Zip: ___________
Designated Voting Delegate or Alternate Delegate will receive an identification card at the Registration Booth at the PMAA Annual Conference.
Please note this form must be returned to the PMAA office by Friday, August 27, 2010.
[Photo: Water droplet creating ripples in water]
[Photo: Wastewater treatment plant clarifier tanks and facility]
Operator Day
at PMAA’s 68th Annual Conference & Trade Show
Hilton Pittsburgh
Tuesday, September 21, 2010
8:00 am – 3:30 pm
Includes breakfast, lunch, up to 4 contact hours, and access to the largest industry trade show in Pennsylvania, all at one low price!
Courses Offered Include:
TASTE & ODOR CONTROL
Course ID #422
9:30 – 11:30 am
Presented by: Dan Guss & John Mazich
Uni-Tec Consulting Engineers
For operators, managers, and board members the main purpose of this basic thru intermediate course is to teach them how to search for and identify the causes and sources of taste and odor problems and how to implement the various treatment options. Also upon completion, operators should be able to develop, operate, and maintain a taste and odor control strategy.
Approved for 2 Contact Hours for Operators Certified in Water.
Chlorine Safety
Course ID #1358
1:30 - 3:00 pm
Presented by: Scott C. Morrison, UNIVAR,
Technical Services Specialist-Operations
Chlorine gas can be very dangerous if it isn't handled and used correctly. This course provides a basic understanding of chlorine gas safety as it relates to use in the treatment of water and wastewater. Course content includes information on chlorine cylinders, transportation, storage, and handling. Also included is a review of piping/feed systems, connecting and unloading to the system and structural concerns. This course concludes with employment training, safety and personal protection equipment, emergency handling and first aid discussions.
Approved for 1.5 Contact Hours for Operators Certified in Water and/or Wastewater
Introduction to Wastewater
Course ID #2412
9:30 - 11:30 am & 1:30 - 3:30pm
Presented by: Dave Brown, Community College of Allegheny County’s (CCAC)
Center for Professional Development
This four-hour course covers the role of the treatment plant operator including duties and responsibilities. Also to be addressed are characteristics of wastewater, its' contaminants and different solids, effects of wastewater discharges and natural cycles in the receiving waters. Basic water treatment processes including the collection and conveyance of wastewater, treatment processes and functions and effluent disposal will be discussed. The course concludes with a review of pertinent State and Federal regulations. This course is part of a 28-hour certificate of completion program given by CCAC.
Approved for 2 Contact Hours for Operators Certified in Wastewater
[Logo: CCAC CENTER FOR Professional Development]
REGISTRATION FORM FOR OPERATORS’ DAY
PMAA’s 68TH ANNUAL CONFERENCE & TRADE SHOW
Hilton Pittsburgh
Tuesday, September 21, 2010
➔➔Photo ID required at time of registration⬅⬅
Registration materials can be picked up at the Conference registration desk between 2 (no earlier) and 3 pm on Monday, September 20th and beginning at 8:00 am on Tuesday, September 21st.
Please complete one form per attendee. PLEASE NOTE: If you have paid a full conference registration, DO NOT pay an addition registration fee to participate in Operator Day.
□ PMAA Member Attendee - $80 (Includes training, breakfast & lunch)
□ Non-PMAA Member Attendee - $95 (Includes training, breakfast & lunch)
NAME: _________________________________________________________________________________
AUTHORITY/COMPANY/SYSTEM: ___________________________________________________________
PA DEP Operator Client ID# (6 digit # only): _______________________________________________
ADDRESS: ______________________________________________________________________________
CITY/STATE/ZIP: ________________________________________________________________________
TELEPHONE: ______________________ FAX: _____________________ EMAIL: _____________________
COURSE SELECTION:
□ Taste & Odor Control - Course ID #422
9:30 - 11:30 am (approved for water)
□ Introduction to Wastewater - Course ID #2412
9:30 - 11:30 am & 1:30 – 3:30 pm (approved for wastewater)
□ Chlorine Safety - Course ID #1358
1:30 - 3:00 pm (approved for water/wastewater)
Method of Payment:
MAIL Registration and Payment to PMAA, 1000 North Front Street, Suite 401, Wormleysburg, PA 17043
FAX Registration with Credit Card information to: (717) 737-8431
□ Check No. ________ made payable to PMAA is enclosed.
□ Visa □ MasterCard □ Discover
Credit Card No. _____________________ Exp. Date _________
3-digit security code on the back of the card: _________
CANCELLATION POLICY
All cancellations must be received in writing, on company letterhead, and sent to PMAA. All cancellations received after August 15 will receive a refund less a $20 administrative fee. After August 31, no refunds will be granted. Substitute registrants are welcome, fax substitution requests to 717-737-8431.
info@municipalauthorities.org • www.municipalauthorities.org