Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
September 13, 2010
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental – Project Manager’s 2010 Report; Pennoni – Engineers Report Dated, 2010; Cost Summary Report Dated August 5, 2010; Change Orders –; .
- RIDLEY CREEK INVOICES Pip Xpress, Inc., #48010, 8/31/10 $ 2,623.51; Gawthrop Greenwood, #81707, 7/31/10 $ 323.00; sOffice Depot, #526332642001, 7/20/10 $ 99.99; Office Depot, #526332974001, 7/16/10 $ 50.39; Office Depot, #528256899001, 8/3/10 $ 46.08; Office Depot, #528256923001, 8/3/10 $ 43.27; Brickhouse Environmental, #5542, 9/1/10 $ 14,087.50; Gawthrop Greenwood, #82227, 8/31/10 $ 1,310.00
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES August 9, 2010
- ENGINEER’S REPORT Pennoni Report –
- APPROVAL OF INVOICES _Gawthrop Greenwood, #81706, 7/31/10 $ 475.00; Gawthrop Greenwood, #82225, 8/31/10 $ 589.00
- LIAISON REPORTS
- FINANCIAL REPORTS
- GOALS September Report
- OLD BUSINESS Comprehensive Plan Goals
- NEW BUSINESS
- CAPACITY REQUESTS
- SEWER REPORTS Director of Public Works Report – August 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - 2010; Artesian Ridley Creek Report –2010
- ANY OTHER MATTER
Monday, September 13, 2010
- 1 -
- CORRESPONDENCE AND REPORTS OF INTEREST WGT 8/4/10 Meeting Minutes;
- PUBLIC COMMENT
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| November 10, 2010 | January 1, 2011 |
Monday, September 13, 2010
- 2 -
[Handwritten: 2 RIDLEY CREEK REPORTS C. 10pg]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY
August 5, 2010
Includes bills paid at 8/10 meetings
| Name | Budget or Contract amt. | This Month | To Date | Balance on Budget or Contract | % of work completed |
|---|---|---|---|---|---|
| RECEIPTS | |||||
| Bond | $9,500,000.00 | $0.00 | $9,500,000.00 | ||
| Pennoni (rechargable) | $20,000.00 | $0.00 | $20,000.00 | ||
| Grant | $464,195.00 | $0.00 | $464,195.00 | ||
| RECEIPTS TOTAL | $9,984,195.00 | $0.00 | $9,984,195.00 | ||
| EXPENSES | |||||
| Borrowing costs | $52,250.00 | $0.00 | $52,250.00 | $0.00 | 100.00% |
| Worth | $7,865,400.00 | $426,170.00 | $7,139,795.62 | $725,604.38 | 90.77% |
| change orders | -$1,400.64 | $0.00 | $0.00 | -$1,400.64 | 0.00% |
| Clinger | $974,000.00 | $42,347.24 | $920,180.20 | $53,819.80 | 94.47% |
| change orders | $33,312.24 | $0.00 | $0.00 | $33,312.24 | 0.00% |
| Pennoni (Inspection) (05) | $136,200.00 | $0.00 | $136,197.62 | $2.38 | 100.00% |
| Pennoni (Continued Services) (10) | $177,900.00 | $17,302.63 | $146,309.36 | $31,590.64 | 82.24% |
| Pennoni (Rechargeable) (06) | $20,000.00 | $0.00 | $12,961.75 | $7,038.25 | 64.81% |
| Brickhouse | $175,000.00 | $11,845.00 | $139,715.00 | $35,285.00 | 79.84% |
| Extras | |||||
| Capital | $453,912.42 | $5,031.47 | $101,409.18 | $352,503.24 | 22.34% |
| Capital (Identified but not paid) | $80,196.00 | $0.00 | $0.00 | $80,196.00 | 0.00% |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $0.00 | $11,520.18 | $479.82 | 96.00% |
| EXPENSES TOTAL | $9,978,770.02 | $502,696.34 | $8,660,338.91 | $1,318,431.11 | 86.79% |
We have identified $56,357 in potential extras.
Retainage (10% until 50% of the project is done then it drops back to 5%)
| Worth | $375,788.72 | 5% |
|---|---|---|
| Clinger | $50,183.89 | 5% |
| Total | $425,972.61 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls SUMMARY V2
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL
September 8, 2010
2 of 10
DETAIL
Worth
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 2/9/2009 | $561,150.00 | Worth & Company | Application #1 | |
| 3/9/2009 | $480,825.00 | Worth & Company | Application #2 | |
| 4/9/2009 | $768,780.00 | Worth & Company | Application #3 | |
| 5/8/2009 | $125,352.90 | Worth & Company | Application #4 | |
| 5/31/2009 | $485,103.12 | Worth & Company | Application #5 | |
| 6/30/2009 | $267,975.00 | Worth & Company | Application #6 | |
| 7/31/2009 | $138,217.50 | Worth & Company | Application #7 | |
| 8/31/2009 | $679,793.40 | Worth & Company | Application #8 | |
| 9/30/2009 | $504,310.98 | Worth & Company | Application #9 | |
| 9/30/2009 | $222,861.55 | Worth & Company | Application #10 (5% retainage) | |
| 10/31/2009 | $724,089.05 | Worth & Company | Application #11 | |
| 11/30/2009 | $379,360.17 | Worth & Company | Application # 12 | |
| 12/31/2009 | $374,772.62 | Worth & Company | Application #13 | |
| 1/31/2010 | $207,881.86 | Worth & Company | Application # 14 | |
| 2/28/2010 | $69,077.35 | Worth & Company | Application # 15 | |
| 3/31/2010 | $75,857.50 | Worth & Company | Application # 16 | |
| 4/30/2010 | $170,263.75 | Worth & Company | Application # 17 | |
| 5/31/2010 | $178,290.62 | Worth & Company | Application #18 | |
| 6/30/2010 | $299,633.25 | Worth & Company | Application #19 | |
| 7/30/2010 | $426,170.00 | Worth & Company | Application #20 | |
| $7,139,765.62 | $7,139,765.62 |
Clinger
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 4/9/2009 | $22,152.64 | Clinger | Application #1 | |
| 5/8/2009 | $15,714.77 | Clinger | Application #2 | |
| 5/31/2009 | $77,973.43 | Clinger | Application #3 | |
| 6/30/2009 | $12,567.46 | Clinger | Application #4 | |
| 8/30/2009 | $10,855.98 | Clinger | Application #5 | |
| 9/30/2009 | $111,255.75 | Clinger | Application #6 | |
| 10/31/2009 | $59,344.83 | Clinger | Application #7 | |
| 11/30/2009 | $145,354.05 | Clinger | Application # 8 | |
| 12/31/2009 | $94,727.00 | Clinger | Application # 9 | |
| 1/31/2010 | $139,092.94 | Clinger | Application #10 | |
| 2/28/2010 | $58,514.64 | Clinger | Application #11 | |
| 2/28/2010 | $41,530.78 | Clinger | Application #12 (5% retainage) | |
| $13,575.79 | Clinger | Application #13 | ||
| 5/2/2010 | $34,539.38 | Clinger | Application # 14 | |
| 6/30/2010 | $40,633.52 | Clinger | Application #15 | |
| 8/1/2010 | $42,347.24 | Clinger | Application # 16 | |
| $920,180.20 | $920,180.20 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls
3 of 10
DETAIL
Pennoni
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| ? | $712.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU ? | |
| 10/30/2008 | $943.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 10/19/08 | |
| 12/5/2008 | $18,115.98 | PENNONI ASSOCIATES INC. | RCSTP EXP. PROJ. SERV. THRU 11/30/08 | |
| 1/15/2009 | $12,929.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 12/28/08 | |
| 2/5/2009 | $13,352.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $31,288.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $29,010.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $22,436.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| 7/29/2009 | $3,528.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 7/19/09 | |
| 12/30/2010 | $16,482.50 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 12/31/10 | |
| 1/29/2010 | $24,224.58 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 1/17/10 | |
| 2/23/2010 | $13,057.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 2/14/10 | |
| 4/1/2010 | $19,243.40 | PENNONI ASSOCIATES INC. | ||
| 5/5/2010 | $18,810.50 | PENNONI ASSOCIATES INC. | Through 4/18/2010 | |
| 5/25/2010 | $19,287.50 | PENNONI ASSOCIATES INC. | Through 5/16/2010 | |
| 6/29/2010 | $17,901.25 | PENNONI ASSOCIATES INC. | Through 6/20/10 | |
| 7/29/2010 | $17,302.63 | PENNONI ASSOCIATES INC. | Through 7/18/2010 | |
| $278,625.76 | $278,625.76 |
Pennoni (rechargeable)
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 2/5/2009 | $2,840.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $4,934.75 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $3,777.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $1,409.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| $12,961.75 | $12,961.75 |
Brickhouse
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 5/12/2009 | $2,127.50 | BRICKHOUSE | Apr-09 | |
| 6/1/2009 | $8,452.50 | BRICKHOUSE | May-09 | |
| 7/1/2009 | $7,791.25 | BRICKHOUSE | Jun-09 | |
| 8/3/2009 | $9,315.00 | BRICKHOUSE | Jul-09 | |
| 9/1/2009 | $7,762.50 | BRICKHOUSE | Aug-09 | |
| 10/1/2009 | $7,417.50 | BRICKHOUSE | Sep-09 | |
| 11/2/2009 | $7,072.50 | BRICKHOUSE | Oct-09 | |
| 12/1/2009 | $7,963.75 | BRICKHOUSE | Nov-09 | |
| 1/4/2010 | $7,762.50 | BRICKHOUSE | Dec-09 | |
| 2/1/2010 | $7,618.75 | BRICKHOUSE | Jan-10 | |
| 3/1/2010 | $7,417.50 | BRICKHOUSE | Feb-10 | |
| 4/1/2010 | $10,005.00 | BRICKHOUSE | Mar-10 | |
| 5/3/2010 | $11,931.25 | BRICKHOUSE | Apr-10 | |
| 6/1/2010 | $10,321.25 | BRICKHOUSE | May-10 | |
| 7/1/2010 | $11,845.00 | BRICKHOUSE | Jun-10 | |
| 8/2/2010 | $14,911.25 | BRICKHOUSE | Jul-10 | |
| $139,715.00 | $139,715.00 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls
[Handwritten: 4 of 10]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| Extras - Capital - Paid | ||||
| 12/22/2008 | $44.98 | EAST GOSHEN TOWNSHIP | REIMBURSE GEN.FUND FOR OFFICE DEPOT | |
| 12/31/2008 | $88.00 | FASTSIGNS | RED ON WHITE ALUM. SIGNS | |
| 1/12/2009 | $177.00 | FASTSIGNS | SIGNS - PLEASE AVOID TOWNE DR.... | |
| 12/1/2008 | $36.00 | GREAT VALLEY LOCKSHOP | KEYS FOR CONTRACTOR | |
| 12/8/2008 | $160.80 | GREAT VALLEY LOCKSHOP | PADLOCKS, REKEY CYLINDERS & KEYS | |
| 12/29/2008 | $474.82 | HANSON AGGREGATES INC | 36.95 TONS SUBBASE AGGREGATE | |
| 12/31/2008 | $908.00 | HANSON AGGREGATES INC | 70.66 TONS SUBGRADE 2 AGGREGATE | |
| 12/15/2008 | $2,089.39 | LENNI ELECTRIC CORPORAT | TEMP SERV. FOR TRAILER - RIDLEY CRK | |
| 12/31/2008 | $120.00 | LENNI ELECTRIC CORPORAT | SEWER PLANT - GUY WIRE RELOCATE | |
| 12/29/2008 | $7,865.00 | MACANGA INC. | TRUCK & TRACKHOE RENTAL 12/5-12/18 | |
| 12/1/2008 | $2,466.00 | PATTERSON, MICHAEL J. | MATERIALS & LABOR - SPLIT RAIL FENCE | |
| 12/1/2008 | $4,907.72 | PIPE XPRESS INC. | COPPER TUBING, BRASS COMP. COUPLING | |
| 12/15/2008 | $813.74 | PIPE XPRESS INC. | BURIAL HYDRANT, BRASS CURB STOP, & | |
| 12/29/2008 | $129.00 | RAM-T CORPORATION | 2 FT. SILT FENCE | |
| 12/1/2008 | $1,183.00 | RANSOME RENTAL COMPAN | CATERPILLAR - TRUCK LOADER RENTAL | |
| 12/8/2008 | $3,960.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 11/13-11/25/08 | |
| 12/29/2008 | $908.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15 - 12/18/08 | |
| 12/31/2008 | $1,044.85 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15-12/16/08 | |
| 12/8/2008 | $119.95 | SAFETY SOLUTIONS INC. | MEDICAL SUPPLIES | |
| 12/1/2008 | $635.60 | US MUNICIPAL SUPPLY INC. | CUSTOM SIGNS - RIDLEY CREEK TREATMT | |
| 12/31/2008 | $157.50 | GAWTHROP GREENWOOD | LEGAL | |
| 1/31/2009 | $936.50 | GAWTHROP GREENWOOD | LEGAL | |
| 3/19/2009 | $1,246.64 | HAMMOND & MCCMLOSY | WATER SERVICE | |
| 3/31/2009 | $1,254.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/2/2009 | $274.21 | PIPE XPRESS INC. | YARD HYDRANT #2 | |
| 4/2/2009 | $1,910.28 | HAMMOND & MCCMLOSY | WATER PIPING | |
| 5/11/2009 | $158.69 | US MUNICIPAL SUPPLY INC. | 3 SIGNS | |
| 4/30/2009 | $264.86 | LENNI ELECTRIC CORPORAT | WIRED HOT WATER HEATER | |
| 5/31/2009 | $133.00 | GAWTHROP GREENWOOD | LEGAL | |
| 6/30/2009 | $304.00 | GAWTHROP GREENWOOD | LEGAL | |
| 7/17/2009 | $1,481.00 | EAST GOSHEN TOWNSHIP | BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE) | |
| 9/10/2009 | $254.85 | AGWAY | TREE STAKES AND PEAT MOSS | |
| 8/25/2009 | $1,855.00 | HARMONY HILL NURSERIES | 16 TREES | |
| 8/31/2009 | $836.00 | GAWTHROP GREENWOOD | 2 MONTH LEGAL | |
| 11/19/2009 | $314.00 | VIMCO | SEALER FOR FLOORS | |
| 10/31/2009 | $285.00 | GAWTHROP GREENWOOD | LEGAL | |
| 12/31/2010 | $1,414.97 | L/B water | YARD HYDRANT #2 | |
| 12/18/2009 | $443.48 | Grainger | Hose Reel 1 inch | |
| 12/18/2009 | $267.98 | Grainger | Hose Reel 3/4 inch | |
| 2/2/2010 | $789.45 | Fisher Scientific | Lab Equipment | |
| 2/28/2010 | $57.00 | GAWTHROP GREENWOOD | LEGAL | |
| 3/15/2010 | $103.96 | Matthews Ford | Van rental | |
| 3/31/2010 | $275.50 | Grainger | Hose | |
| 3/31/2010 | $247.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/7/2010 | $70.15 | GREAT VALLEY LOCKSHOP | 6 locks | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls DETAIL
[Handwritten: 5 of 10]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 4/14/2010 | $641.98 | Grainger | Shelving | |
| 4/15/2010 | $1,127.48 | Continetal Fire & Safety | 3" & 1.75" Hose | |
| 4/16/2010 | $28.58 | Grainger | Phone | |
| 3/17/2010 | $1,092.01 | Water Pollution Biology | Michael Geradi - Talk | |
| 2/22/2010 | $1,104.50 | McNICHOLS | Safety Grating | |
| 5/5/2010 | $1,078.38 | HAMMOND & MCCMLOSY | WATER LINE OFFICE | |
| 5/5/2010 | $270.10 | HAMMOND & MCCMLOSY | Hose fitting in storage room | |
| 5/3/2010 | $2,329.17 | Fisher Scientific | DESICCATOR & OVEN | |
| 5/12/2010 | $1,485.63 | Fisher Scientific | FURNACE | |
| 5/21/2010 | $456.81 | USA Blue book | beakers | |
| 4/29/2010 | $258.00 | Marco | 3 10Lb dry Chem FX | |
| 5/9/2010 | $142.47 | Staples | office equipment | |
| 5/31/2010 | $1,862.00 | GAWTHROP GREENWOOD | Legal | |
| 5/15/2010 | $39,937.70 | Aqua Wastwwater Mgt | Sludge from DAVCO | |
| 6/30/2010 | $126.63 | PIPE XPRESS INC. | pipe | |
| 6/15/2010 | $204.40 | GREAT VALLEY LOCKSHOP | locks | |
| 6/8/2010 | $150.00 | O'Rourke and Sons | Bend counter tops | |
| 6/29/2010 | $615.00 | PENNONI | Soda Ash | |
| 7/20/2010 | $99.99 | Office Depot | Printer | |
| 7/16/2010 | $50.39 | Office Depot | Printer cartridge | |
| 7/27/2010 | $649.00 | Newtown Office Supply | Desk | |
| 7/31/2010 | $589.00 | GAWTHROP GREENWOOD | Legal | |
| 6/29/2010 | $193.93 | Fastenal | Chain | |
| 6/29/2010 | $1,019.00 | LENNI ELECTRIC CORPORA | Lights | |
| 7/12/2010 | $328.70 | HAMMOND & MCCMLOSY | sink | |
| 7/15/2010 | $154.23 | Hach | cable | |
| 7/16/2010 | $347.26 | Hach | Combo | |
| 8/8/2010 | $1,599.97 | Northern | Air Compressor | |
| Total | $101,409.18 | $101,409.18 | ||
| Extras - Capital - Identified capital extras that have not been paid | ||||
| $20,396.00 | Driveway Restoration | |||
| $3,300.00 | Restoration of parking area | |||
| $50,000.00 | Paving at RCSTP (we received a credit from Worth) | |||
| $6,500.00 | Audit | |||
| Total | $80,196.00 | $80,196.00 | ||
| Trailer, Phone, Porta Potty & Internet | ||||
| 12/15/2008 | $1,039.10 | ACTON MOBILE INDUSTRIES | RENTAL MOBILE OFFICE | |
| 12/22/2008 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - THRU 1/19/09 | |
| 1/21/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 1/20-2/20/09 | |
| 2/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 2/20- 3/20/09 | |
| 3/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 3/20 - 4/19 | |
| 4/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 4/20 - 5/19 | |
| 5/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 5-20 - 6/19 | |
| 6/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 6/20 - 7/19 | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls DETAIL
[Handwritten: 6 of 10]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 7/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 7/20 to 8/19 | |
| 8/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 8/20/ to | |
| 9/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | ||
| 10/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 11/19 | |
| 11/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 12/19 | |
| 12/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 1/19 | |
| 1/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 2/19/10 | |
| 2/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 3/19/10 | |
| 3/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 4/19 | |
| 4/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 5/19 | |
| 5/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 6/19 | |
| 6/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 7/19 | |
| 7/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 8/19 | |
| $5,821.10 | $5,821.10 | |||
| 12/15/2008 | $140.00 | POTTY QUEEN | RENTAL PORTABLE TOILET - RIDLEY CRK | |
| 12/22/2008 | $64.47 | POTTY QUEEN | RENTAL TOILET 12/23-1/10/08 | |
| 2/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 2/8-3/7 | |
| 3/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 3/8-4/4 | |
| 4/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 4/5-5/2 | |
| 5/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET ???? | |
| 7/26/2009 | $95.00 | POTTY QUEEN | RENTAL 7/26 to 8/22 | |
| 8/23/2009 | $95.00 | POTTY QUEEN | Rental 8/23 to 9/19 | |
| 9/20/2009 | $95.00 | POTTY QUEEN | RENTAL 9/20 to 10/17 | |
| 10/18/2009 | $95.00 | POTTY QUEEN | 10/18/09 to 11/14/09 | |
| 11/14/2009 | $95.00 | POTTY QUEEN | 11/15 to 12/13 | |
| 12/13/2009 | $95.00 | POTTY QUEEN | 12/13 to 1/9/10 | |
| 1/10/2010 | $95.00 | POTTY QUEEN | 1/10/10 to 2/6/10 | |
| 2/7/2010 | $95.00 | POTTY QUEEN | 2/7/10 to 3/6/10 | |
| 3/7/2010 | $95.00 | POTTY QUEEN | 3/7 to 4/3 | |
| 4/4/2010 | $95.00 | POTTY QUEEN | 4/4 to 5/1 | |
| 5/2/2010 | $98.80 | POTTY QUEEN | 5/2 to 5/29 | |
| 5/30/2010 | $96.90 | POTTY QUEEN | 5/30 to 6/26 | |
| 6/30/2010 | $96.90 | POTTY QUEEN | 6/27 to 7/24 | |
| 7/28/2010 | $96.90 | POTTY QUEEN | 7/25 to 8/21 | |
| $1,923.97 | $1,923.97 | |||
| 12/22/2008 | $174.65 | VERIZON -7041 | NOVEMBER 25 - DECEMBER 6, 2008 | |
| 1/7/2009 | $137.87 | VERIZON -7041 | BILLING DATE 1/07/09 | |
| 2/7/2009 | $130.34 | VERIZON -7041 | BILLING DATE 2/07/09 | |
| 3/7/2009 | $133.97 | VERIZON -7041 | BILLING DATE 3/7/09 | |
| 4/7/2009 | $136.00 | VERIZON -7041 | BILLING DATE 4/7/09 | |
| 5/7/2009 | $137.66 | VERIZON -7041 | BILLING DATE 5/7/09 | |
| 6/7/2009 | $178.47 | VERIZON -7041 | BILLINGDATE 6/7/2009 | |
| 7/7/2009 | $145.21 | VERIZON -7041 | Billing Date 7/7/09 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls DETAIL
[Handwritten: 7 of 10]
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 8/7/2009 | $134.44 | VERIZON -7041 | Billing Date 8/7/09 | |
| 9/7/2009 | $132.93 | VERIZON -7041 | billing date 9/7/09 | |
| 10/7/2009 | $133.43 | VERIZON -7041 | Billing date 10/7/09 | |
| 11/7/2009 | $133.79 | VERIZON -7041 | Billing Date 11/7/09 | |
| 12/7/2009 | $136.76 | VERIZON -7041 | Billing date 12/7/09 | |
| 1/7/2010 | $135.11 | VERIZON -7041 | Billing date 1/7/10 | |
| 2/7/2010 | $134.35 | VERIZON -7041 | Billing date 2/7/10 | |
| 3/7/2010 | $134.34 | VERIZON -7041 | Billing date 3/7/10 | |
| 4/7/2010 | $134.72 | VERIZON -7041 | Billing date 4/7/10 | |
| 5/7/2010 | $136.37 | VERIZON -7041 | billing ddate 5/7/2010 | |
| 6/7/2010 | $134.06 | VERIZON -7041 | Billing date 6/7/10 | |
| 7/7/2010 | $134.18 | VERIZON -7041 | Billing date 7/7/10 | |
| $2,788.65 | $2,788.65 | |||
| 8/31/2009 | $286.56 | VERIZON | INTERNET (FIRST BILL) | |
| 9/28/2009 | $69.99 | VERIZON | INTERNET | |
| 10/28/2009 | $69.99 | VERIZON | INTERNET | |
| 11/28/2009 | $69.99 | VERIZON | INTERNET | |
| 12/28/2009 | $69.99 | VERIZON | INTERNET | |
| 1/28/2010 | $69.99 | VERIZON | INTERNET | |
| 2/28/2010 | $69.99 | VERIZON | INTERNET | |
| 3/28/2010 | $69.99 | VERIZON | INTERNET | |
| 4/28/2010 | $69.99 | VERIZON | INTERNET | |
| 5/28/2010 | $69.99 | VERIZON | INTERNET | |
| 6/28/2010 | $69.99 | VERIZON | INTERNET | |
| $986.46 | $986.46 | |||
| Trailer, Phone, Porta Potty & Internet Total | $11,520.18 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls DETAIL
[Handwritten: 8 of 10]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS
September 8, 2010
| NO. | AMOUNT | APPROVED | WORK | STATUS | PAID |
|---|---|---|---|---|---|
| WORTH | |||||
| 1 | $3,209.70 | 2/24/09 | BLOWER #1 REPAIR | APPROVED | NO |
| 4 | $5,542.80 | 5/11/09 | BLOWER #2 REPAIR | APPROVED | NO |
| ? | $4,617.08 | ??? | BLOWER #3 REPAIR | APPROVED | NO |
| 3 | $2,703.00 | 12/14/09 | ANTI-FLOT COLLAR | APPROVED | NO |
| 5 | $6,784.65 | 12/14/09 | LARGER MIXER FOR FLOC TANK | APPROVED | NO |
| 15 | $4,494.52 | 12/14/09 | REMOVABLE RAILS ON SBR TANK | APPROVED | NO |
| 17 | $6,126.78 | 3/8/10 | BLOWER #4 REPAIR | APPROVED | NO |
| 8 | -$6,250.00 | 3/8/10 | CREDIT FOR CAST IRON PIPE | APPROVED | NO |
| -$20,000.00 | 2/8/10 | Credit for Electric Wages | APPROVED | NO | |
| 9 | -$50,000.00 | 2/8/10 | Credit for paving | APPROVED | NO |
| 19 | $27,702.20 | 5/20/10 | air drops | APPROVED | NO |
| 20 | $3,516.77 | 5/20/10 | 2 doors | APPROVED | NO |
| 21 | $18,094.59 | 5/20/10 | Paint DAVCO WALKWAYS | APPROVED | NO |
| 22 | -$13,875.00 | 5/20/10 | Credit for concrete | APPROVED | NO |
| 24 | $5,932.27 | 6/14/10 | Additional block Sludge building | APPROVED | NO |
| Total | -$1,400.64 | ||||
| CLINGER | |||||
| 1 | $5,106.00 | Denied | EXTEND 34 KV LINES | DENIED | |
| 2 | $23,585.00 | 7/1/09 | CORNER UNIT FOR MCC | APPROVED | NO |
| 3 | $3,171.00 | 4/12/10 | Applebrook Pump | APPROVED | NO |
| 4 | $1,451.24 | 3/23/10 | Cables for 2 chart recorders | APPROVED | NO |
| Total | $33,313.24 | ||||
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls CHANGE ORDERS
[Handwritten: 9 of 10]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS
September 8, 2010
| Potential capital extras | ||
|---|---|---|
| Pipe conduit Conflicts | ||
| Controls | $10,000 | |
| Sludge room retrofit | ||
| HVAC Thermostats | $5,000 | |
| Cathode Protection | $10,000 | |
| Treatment Tanks | $0 | |
| Electrician (increase in wages) | $20,000 | |
| UV Channel | $11,357 | |
| Total potential extras | $56,357 | $56,357 |
| Potential Receipts | ||
| Total Potential Receipts | $0 | $0 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls POTENTIAL EXTRAS
[Handwritten: 10 of 10]
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
PROJECTED FINAL COSTS
September 8, 2010
| Name | Budget or Contract amt. | Paid to Date | Projected Final Cost |
|---|---|---|---|
| EXPENSES | |||
| Borrowing costs | $52,250.00 | $52,250.00 | $52,250.00 |
| Worth | $7,865,400.00 | $7,139,795.62 | $7,865,400.00 |
| change orders | -$1,400.64 | $0.00 | $21,357.00 |
| Clinger | $974,000.00 | $920,180.20 | $974,000.00 |
| change orders | $33,312.24 | $0.00 | $33,312.24 |
| Pennoni (Inspection) (05) | $136,200.00 | $136,197.62 | $136,197.62 |
| Pennoni (Continued Services) (10) | $177,900.00 | $146,309.36 | $177,900.00 |
| Pennoni (Rechargeable) (06) | $20,000.00 | $12,961.75 | $12,961.75 |
| Brickhouse | $175,000.00 | $139,715.00 | $155,000.00 |
| Extras | |||
| Capital | $453,912.42 | $101,409.18 | $111,409.18 |
| Capital (Identified but not paid) | $80,196.00 | $0.00 | $73,696.00 |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $11,520.18 | $13,500.00 |
| EXPENSES TOTAL | $9,978,770.02 | $8,660,338.91 | $9,626,983.79 |
Worth Change Orders - assumes we will spend $11,357 for the UV Channel and $10,000 for Unknown
Extras Capital - assumes $10,000 for Unknown
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 090810.xls Projections
[Handwritten: 3. RIDLEY CREEK INV.]
Pipe Xpress, Inc.
PO BOX 5088
West Chester, PA 19380-9998
610-918-7120
FAX 610-918-1328
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: [Handwritten: 07424 7454]
2010 SEP 1 PM 12 41
Invoice
| Date | Invoice # |
|---|---|
| 8/31/2010 | 48010 |
| Bill To | Ship To |
|---|---|
| EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
SEWER PLANT 1751 TOWN DRIVE 610 656 2742 MARK 610 656 2743 GEORGE DELIV: BY TUES 1ST AM 8/31 |
| P.O. No. | Terms | Due Date | Rep | Ship Date | Ship Via | Ordered |
|---|---|---|---|---|---|---|
| VERBAL | 2% 10 Net 30 | 9/30/2010 | 8/30/2010 | OUR TRUCK | MARK |
| Item | Description | Order... | Invoiced | Rate | Ship Date | Backordered | Amount |
|---|---|---|---|---|---|---|---|
| P860 | 6 X 20' PVC S80 PIPE PE | 200 | 200 | 9.41 | 0 0 |
1,882.00 | |
| 801-60 | 6 PVC S80 TEE SXSXS | 3 | 3 | 50.38 | 0 0 |
151.14 | |
| 806-60 | 6 PVC S80 90 ELL SXS | 5 | 5 | 29.96 | 0 0 |
149.80 | |
| 829-60 | 6 PVC S80 COUPLING SXS | 6 | 6 | 24.95 | 0 0 |
149.70 | |
| 1928 | 4 X 6 X 6 PVC SD OFFSET DSA DSXH | 7 | 7 | 15.96 | 0 0 |
111.72 | |
| 1215 | 6 PVC SD X DWV ADAPTER SPGXSOC | 7 | 7 | 19.79 | 0 0 |
138.53 | |
| 717-4 | QT PVC GRAY HD CEMENT | 2 | 2 | 12.37 | 0 0 |
24.74 | |
| P70-4 | QT CLEAR PRIMER | 1 | 1 | 11.88 | 0 0 |
11.88 | |
| BRUSH2 | 2 WIDE APPLICATOR BRUSH | 2 | 2 | 2.00 | 0 | 4.00 |
Thank you for your business.
| Subtotal | $2,623.51 |
|---|---|
| Sales Tax () | $0.00 |
| Total | $2,623.51 |
[Handwritten: R.C. Expansion ok RS 9/1]
[Handwritten: 3. RIDLEY CREEK REPT]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Page: 1 | |
|---|---|
| 07/31/2010 | |
| Client No. | 6604-06M |
| Invoice No. | 81707 |
Ridley Creek Treatment Plant Upgrades/ Expansion
Fees
| Date / Ref | Description | Hours | Amount |
|---|---|---|---|
| 07/06/2010 RFA |
Review message from Rick Smith regarding Clinger settlement proposal; Message to Rick Smith regarding estimated cost of arbitration. | 0.60 | |
| 07/07/2010 RFA |
Review message from Jack Yahraes regarding Clinger settlement offer. | 0.30 | |
| 07/09/2010 RFA |
Review project manager June 2010 executive summary and report dated July 8, 2010. | 0.50 | |
| 07/12/2010 RFA |
Review message from Rick Smith regarding Clinger settlement offer. | 0.30 | |
| For Current Services Rendered | 1.70 | 323.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 1.70 | $190.00 | $323.00 |
| Previous Balance | $266.00 |
|---|---|
| Total Current Charges | 323.00 |
| Balance Due | $589.00 |
[Handwritten: [signature] Talk To Bob]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
[Handwritten: 3. RIDLEY CREEK INV C. 10000]
[Stamp: INITIAL & RETURN TO AP]
Office DEPOT
Office Depot, Inc
PO BOX 630813
CINCINNATI OH 45263-0813
ORIGINAL INVOICE
THANKS FOR YOUR ORDER
IF YOU HAVE ANY QUESTIONS OR PROBLEMS, JUST CALL US
FOR CUSTOMER SERVICE ORDER: (888) 263-3423
FOR ACCOUNT: (800) 721-6592
FEDERAL ID: 59-2663954
| INVOICE NUMBER | AMOUNT DUE | PAGE NUMBER |
|---|---|---|
| 526332642001 | 99.99 | Page 1 of 1 |
| INVOICE DATE | TERMS | PAYMENT DUE |
| 20-JUL-10 | Net 30 | 21-AUG-10 |
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: ________
| BILL TO: | SHIP TO: |
|---|---|
| ATTN: ACCOUNTS PAYABLE EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107 002600-003443 |
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107 003443 |
| ACCOUNT NUMBER | PURCHASE ORDER | SHIP TO ID | ORDER NUMBER | ORDER DATE | SHIPPED DATE |
|---|---|---|---|---|---|
| 36759870 | 1580PAOLIPIKE | 526332642001 | 15-JUL-10 | 20-JUL-10 | |
| BILLING ID | ACCOUNT MANAGER | RELEASE | ORDERED BY | DESKTOP | COST CENTER |
| 69297 | DIANE DEGNAN |
| CATALOG ITEM #/ MANUF CODE |
DESCRIPTION/ CUSTOMER ITEM # |
U/M TAX |
QTY ORD |
QTY SHP |
QTY B/O |
UNIT PRICE |
EXTENDED PRICE |
|---|---|---|---|---|---|---|---|
| 669357 MFC295CN |
ALL IN ONE,INKJET,MFC-295C 669357 |
EA Y |
1 | 1 | 0 | 99.990 | 99.99 |
[Handwritten: RC for Sewer Plant per M. Miller]
| SUB-TOTAL | 99.99 |
|---|---|
| DELIVERY | 0.00 |
| SALES TAX | 0.00 |
| TOTAL | 99.99 |
All amounts are based on USD currency
To return supplies, please repack in original box and insert our packing list, or copy of this invoice. Please note problem so we may issue credit or replacement, whichever you prefer. Please do not ship collect. Please do not return furniture or machines until you call us first for instructions. Shortage or damage must be reported within 5 days after delivery.
DETACH HERE
| CUSTOMER NAME | BILLING ID | INVOICE NUMBER | INVOICE DATE | INVOICE AMOUNT | AMOUNT ENCLOSED |
|---|---|---|---|---|---|
| EAST GOSHEN TOWNSHIP | 69297 | 526332642001 | 20-JUL-10 | 99.99 |
FLO 000692970 5263326420014 00000009999 1 5
| Please Send Your Check to: | OFFICE DEPOT PO Box 633211 Cincinnati OH 45263-3211 |
Please return this stub with your payment to ensure prompt credit to your account. Please DO NOT staple or fold. Thank You. |
|---|
002600-003443 00001/00005
[Handwritten: 3. RIDLEY CREEK INV d. 10000]
[Stamp: & RETURN TO AP [initials]]
Office DEPOT
Office Depot, Inc
PO BOX 630813
CINCINNATI OH 45263-0813
ORIGINAL INVOICE
THANKS FOR YOUR ORDER
IF YOU HAVE ANY QUESTIONS OR PROBLEMS, JUST CALL US
FOR CUSTOMER SERVICE ORDER: (888) 263-3423
FOR ACCOUNT: (800) 721-6592
FEDERAL ID: 59-2663954
| INVOICE NUMBER | AMOUNT DUE | PAGE NUMBER |
|---|---|---|
| 526332974001 | 50.39 | Page 1 of 1 |
| INVOICE DATE | TERMS | PAYMENT DUE |
| 16-JUL-10 | Net 30 | 21-AUG-10 |
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: ________
| BILL TO: | SHIP TO: |
|---|---|
| ATTN: ACCOUNTS PAYABLE EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107 002600-003443 |
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107 003443 |
| ACCOUNT NUMBER | PURCHASE ORDER | SHIP TO ID | ORDER NUMBER | ORDER DATE | SHIPPED DATE |
|---|---|---|---|---|---|
| 36759870 | 1580PAOLIPIKE | 526332974001 | 15-JUL-10 | 16-JUL-10 | |
| BILLING ID | ACCOUNT MANAGER | RELEASE | ORDERED BY | DESKTOP | COST CENTER |
| 69297 | DIANE DEGNAN |
| CATALOG ITEM #/ MANUF CODE |
DESCRIPTION/ CUSTOMER ITEM # |
U/M TAX |
QTY ORD |
QTY SHP |
QTY B/O |
UNIT PRICE |
EXTENDED PRICE |
|---|---|---|---|---|---|---|---|
| 935487 LC614PKS |
INK,BROTHER LC61,4PK,BLK/C 935487 |
PK Y |
1 | 1 | 0 | 50.390 | 50.39 |
[Handwritten: RC for Sewer Plant per M. Miller]
| SUB-TOTAL | 50.39 |
|---|---|
| DELIVERY | 0.00 |
| SALES TAX | 0.00 |
| TOTAL | 50.39 |
All amounts are based on USD currency
To return supplies, please repack in original box and insert our packing list, or copy of this invoice. Please note problem so we may issue credit or replacement, whichever you prefer. Please do not ship collect. Please do not return furniture or machines until you call us first for instructions. Shortage or damage must be reported within 5 days after delivery.
DETACH HERE
| CUSTOMER NAME | BILLING ID | INVOICE NUMBER | INVOICE DATE | INVOICE AMOUNT | AMOUNT ENCLOSED |
|---|---|---|---|---|---|
| EAST GOSHEN TOWNSHIP | 69297 | 526332974001 | 16-JUL-10 | 50.39 |
FLO 000692970 5263329740012 00000005039 1 6
| Please Send Your Check to: | OFFICE DEPOT PO Box 633211 Cincinnati OH 45263-3211 |
Please return this stub with your payment to ensure prompt credit to your account. Please DO NOT staple or fold. Thank You. |
|---|
002600-003443 00002/00005
[Handwritten: 3 RIDLEY CREEK INV.]
[Stamp: & RETURN TO AP [initials]]
Office DEPOT
Office Depot, Inc
PO BOX 630813
CINCINNATI OH 45263-0813
ORIGINAL INVOICE
THANKS FOR YOUR ORDER
IF YOU HAVE ANY QUESTIONS OR PROBLEMS, JUST CALL US
FOR CUSTOMER SERVICE ORDER: (888) 263-3423
FOR ACCOUNT: (800) 721-6592
FEDERAL ID: 59-2663954
| INVOICE NUMBER | AMOUNT DUE | PAGE NUMBER |
|---|---|---|
| 528256899001 | 46.08 | Page 1 of 1 |
| INVOICE DATE | TERMS | PAYMENT DUE |
| 03-AUG-10 | Net 30 | 04-SEP-10 |
| BILL TO: | SHIP TO: |
|---|---|
| ATTN: ACCOUNTS PAYABLE EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107 001898-003545 |
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107 003545 |
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: ________
| ACCOUNT NUMBER | PURCHASE ORDER | SHIP TO ID | ORDER NUMBER | ORDER DATE | SHIPPED DATE |
|---|---|---|---|---|---|
| 36759870 | 1580PAOLIPIKE | 528256899001 | 02-AUG-10 | 03-AUG-10 | |
| BILLING ID | ACCOUNT MANAGER | RELEASE | ORDERED BY | DESKTOP | COST CENTER |
| 69297 | DIANE DEGNAN |
| CATALOG ITEM #/ MANUF CODE |
DESCRIPTION/ CUSTOMER ITEM # |
U/M TAX |
QTY ORD |
QTY SHP |
QTY B/O |
UNIT PRICE |
EXTENDED PRICE |
|---|---|---|---|---|---|---|---|
| 342703 7553 |
BOARD,DRY ERASE,2'X3',PLAS 342703 |
EA Y |
1 | 1 | 0 | 37.080 | 37.08 |
| 810929 810929 |
FOLDER,HNG,LTR,1/3CUT,25B 810929 |
BX Y |
1 | 1 | 0 | 4.210 | 4.21 |
| 810838 810838 |
FOLDER,LTR,1/3CUT,100BX,M 810838 |
BX Y |
1 | 1 | 0 | 4.790 | 4.79 |
[Handwritten: 1401-2100 (pointing to item 1)]
[Handwritten: for Sewer Plant (yes) (pointing to items 2 & 3)]
[Handwritten: RC 07424 7454]
| SUB-TOTAL | 46.08 |
|---|---|
| DELIVERY | 0.00 |
| SALES TAX | 0.00 |
| TOTAL | 46.08 |
All amounts are based on USD currency
To return supplies, please repack in original box and insert our packing list, or copy of this invoice. Please note problem so we may issue credit or replacement, whichever you prefer. Please do not ship collect. Please do not return furniture or machines until you call us first for instructions. Shortage or damage must be reported within 5 days after delivery.
DETACH HERE
| CUSTOMER NAME | BILLING ID | INVOICE NUMBER | INVOICE DATE | INVOICE AMOUNT | AMOUNT ENCLOSED |
|---|---|---|---|---|---|
| EAST GOSHEN TOWNSHIP | 69297 | 528256899001 | 03-AUG-10 | 46.08 |
FLO 000692970 5282568990013 00000004608 1 5
| Please Send Your Check to: | OFFICE DEPOT PO Box 633211 Cincinnati OH 45263-3211 |
Please return this stub with your payment to ensure prompt credit to your account. Please DO NOT staple or fold. Thank You. |
|---|
001898-003545 00002/00003
ORIGINAL INVOICE
3. RIDLEY CREEK INV 10000 f.
Office DEPOT
Office Depot, Inc.
PO BOX 630813
CINCINNATI OH 45263-0813
OK TO AP
FEDERAL ID: 59-2663954
THANKS FOR YOUR ORDER
IF YOU HAVE ANY QUESTIONS OR PROBLEMS, JUST CALL US
FOR CUSTOMER SERVICE ORDER: (888) 263-3423
FOR ACCOUNT: (800) 721-6592
| INVOICE NUMBER | AMOUNT DUE | PAGE NUMBER |
|---|---|---|
| 528256923001 | 43.27 | Page 1 of 1 |
| INVOICE DATE | TERMS | PAYMENT DUE |
| 03-AUG-10 | Net 30 | 04-SEP-10 |
BILL TO:
ATTN: ACCOUNTS PAYABLE
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| ACCOUNT NUMBER | PURCHASE ORDER | SHIP TO ID | ORDER NUMBER | ORDER DATE | SHIPPED DATE |
|---|---|---|---|---|---|
| 36759870 | 1580PAOLIPIKE | 528256923001 | 02-AUG-10 | 03-AUG-10 | |
| BILLING ID | ACCOUNT MANAGER | RELEASE | ORDERED BY | DESKTOP | COST CENTER |
| 69297 | DIANE DEGNAN |
| CATALOG ITEM #/ MANUF CODE |
DESCRIPTION/ CUSTOMER ITEM # |
U/M TAX |
QTY ORD |
QTY SHP |
QTY B/O |
UNIT PRICE |
EXTENDED PRICE |
|---|---|---|---|---|---|---|---|
| 468529 S563 |
BOARD,COMBO,COLOR 468529 |
EA Y |
1 | 1 | 0 | 43.270 | 43.27 |
APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: 08-429-2104
For Sewer plant
R.C.
| SUB-TOTAL | 43.27 |
|---|---|
| DELIVERY | 0.00 |
| SALES TAX | 0.00 |
| TOTAL | 43.27 |
All amounts are based on USD currency
To return supplies, please repack in original box and insert our packing list, or copy of this invoice. Please note problem so we may issue credit or replacement, whichever you prefer. Please do not ship collect. Please do not return furniture or machines until you call us first for instructions. Shortage or damage must be reported within 5 days after delivery.
▲ DETACH HERE ▲
| CUSTOMER NAME | BILLING ID | INVOICE NUMBER | INVOICE DATE | INVOICE AMOUNT | AMOUNT ENCLOSED |
|---|---|---|---|---|---|
| EAST GOSHEN TOWNSHIP | 69297 | 528256923001 | 03-AUG-10 | 43.27 |
FLO 000692970 5282569230013 00000004327 1 3
Please Send Your Check to:
OFFICE DEPOT
PO Box 633211
Cincinnati OH 45263-3211
Please return this stub with your payment to ensure prompt credit to your account.
Please DO NOT staple or fold. Thank You.
00003/00003
3. RIDLEY CREEK INV.
g.
4 pgs
Brickhouse Environmental
Consultants and Engineers
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
| Invoice number | 5542 |
|---|---|
| Date | 9/1/2010 |
| Client ID: | 548 |
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of August 2010.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 122.50 | 14,087.50 |
| Labor Total | 122.50 | 14,087.50 |
| Reimbursable | Amount |
|---|---|
| 0.00 | |
| Expense Total | 0.00 |
| Invoice Total | 14,087.50 |
Approved
9/9/10
[signature]
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
When Creativity & Experience Count
www.brickhouse-environmental.com
2 of 4
Brickhouse Environmental
Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
August 2010
The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:
- 8-5-10 Attend 7:30 am Special Meeting including Bob Adams & Steve McDonnell.
- 8-5-10 Attend biweekly Progress Meeting.
- 8-5-10 Prepare Project Managers Report for July 2010.
- 8-5-10 Prep for and attend Monthly Authority Meeting.
- 8-6-10 Site visit to check construction progress: Davco #2 sandblasting and Clinger working in Dewatering Building.
- 8-9-10 Site visit to check construction progress: Davit bolt installation on SBR #2 not finished; painters working on main steps to Davcos; Clinger foreman & 1 apprentice working in centrifuge room; alum feed not working in auto; plant meeting existing (old) permit limits but would not meet the new permit.
- 8-9-10 Attend Authority Monthly Meeting.
- 8-10-10 Site visit to check construction progress: Clinger foreman and 3 apprentices on-site; observed Davco #2 passing spark test.
- 8-11-10 Moyno pump start up - not all piping completed. Painters on Davco stairs; Clinger foreman and 2 apprentices observed on-site.
- 8-11-10 Moyno pump start up - not all piping completed. Painters on Davco stairs; Clinger foreman and 2 apprentices observed on-site.
- 8-11-10 Moyno pump start up - not all piping completed. Painters on Davco stairs; Clinger foreman and 2 apprentices observed on-site. Confirm polymer vessel will fit beneath centrifuge cradle.
- 8-17-10 Preliminary evaluation for centrifuge / sludge dewatering training initiated.
- 8-19-10 Polymer delivered for centrifuge start up. SBR #3 valving to be evaluated. New substantial completion date = 9/10/10. Matt Burke (Clinger foreman) no longer on-site. Grit blanket in Screen Building influent channel 6” thick. Corrosion on Rotamat (screen unit) lower outer jacket and channel box increasing.
3 of 4
Brickhouse Environmental
- 8-24-10 Special Authority Meeting at 7:30 am with Steve O’Donnell.
- 8-26-10 Site visit to check on construction progress: Verizon failed to show in a.m. at site. Verizon states that log indicates the man was there but the site was closed. (This appears to be a cover up for the man arriving after hours the day before.); Clinger foreman and 2 apprentices working at panel beneath Davco stairs; scheduled walkover for 9-2-10 to develop Preliminary Punch List.
- During the month of August, Brickhouse spent considerable additional time at the plant on operations / various start up issues and in coordinating project needs. Lending to both mundane and technical issues, this time is not specifically detailed above. This time was increased due to the unanticipated medical absence of the Pennoni inspector, Matt McAloon.
Note:
Brickhouse’s project management involvement was originally anticipated to be completed week ending August 8, 2010 at 1,507 hours.
The duration of Brickhouse’s involvement was extended, without increase in total contract hours or value to Brickhouse, to week ending October 10, 2010.
As of August 31, 2010 the cumulative project management hours totaled 1,343.5.
J:\092532.0\August 2010 Bullets.doc
4 of 4
Brickhouse Environmental
East Goshen Township: Ridley Creek Sewer Plant Expansion Project Management Schedule Supplement
The original budget estimate was adjusted from 67 weeks for a cumulative $175,030 (at $115/hour) to 76 weeks for the same cumulative $175,030 (at $115/hour) in order to reflect actual total as of August 31, 2010 as a new baseline.
| Week Ending | Projected Totals | Actual Totals | ||||||
|---|---|---|---|---|---|---|---|---|
| Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | |
| 31-Aug-10 Week 66 | 12 | 1,344 | $154,503 | $14,087.50 | 122.5 | 1343.5 | $154,503 | $14,087.50 |
| 5-Sep-10 Week 71 (3 days) | 21 | 1,364 | $156,860 | |||||
| 12-Sep-10 Week 72 | 20 | 1,384 | $159,160 | |||||
| 19-Sep-10 Week 73 | 30 | 1,414 | $162,610 | |||||
| 26-Sep-10 Week 74 | 30 | 1,444 | $166,060 | |||||
| 30-Sep-10 Week 75 (4 days) | 25 | 1,469 | $168,935 | $14,433 | ||||
| 3-Oct-10 Week 75 (1 day) | 4 | 1,473 | $169,395 | |||||
| 10-Oct-10 Week 76 | 35 | 1,508 | $173,420 | $4,485 | ||||
The above schedule reflects projected totals. A contingency budget of 14 hours and $1,610 remains to meet the original contract total value.
J:\092532.0\Project Management\PM Schedule\Schedule_Revised.xls
Page 1 of 1
3. RIDLEY CREEK INV
h.
1 pg
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Page: | 1 |
|---|---|
| Date: | 08/31/2010 |
| Client No: | 6604-08M |
| Invoice No. | 82227 |
Ridley Creek Treatment Plant Upgrade/Expansion;
Fees
| 08/02/2010 | Conference with Steve McDonnell regarding construction delay claim. | |
|---|---|---|
| 08/05/2010 | Conference with staff, consultants and Steve McDonnell regarding defense of potential arbitration claim. Review of contract and materials claim; attend meeting with Township Manager. |
|
| 08/09/2010 | Preparation for meeting with R Adams. | |
| 08/10/2010 | Review correspondence from R Smith regarding release. Review of settlement agreement; conference with R Adams regarding effect of agreement. |
|
| 08/18/2010 | Telephone conference with cient regarding file review. | |
| 08/24/2010 | Conference with Authority and consultants. | |
| For Current Services Rendered | 1,295.00 | |
Expenses
| Photocopies | 15.00 |
|---|---|
| Total Expenses Thru 08/31/2010 | 15.00 |
| Total Current Charges | 1,310.00 |
| Balance Due | $1,310.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
5. MINUTES
6 pgs
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 9, 2010
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday August 9, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, and Joseph McCawley. Also in attendance were: Rick Smith, Township Manager; Dave Evans from Brickhouse Environmental; Matt McAloon, Authority Engineer; Bob Adams and Steve McDonnell, Authority Solicitors; Carmen Battavio, Township Supervisor; and Mark Miller, Director of Public Works.
COMMON ACRONYMS:
| MA - Municipal Authority | I&I – Inflow & Infiltration |
|---|---|
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| PC – Planning Commission | LCSTP – Lockwood Chase Sewer Treatment Plant |
| CB – Conservancy Board | DEP – Department of Environmental Protection |
| PR – Park & Recreation Board | EPA – Environmental Protection Agency |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| SSO – Sanitary System Overflow | WAS – Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. Jack moved at 7:05 p.m. to go into Executive Session. Fran seconded the motion. Motion passed unanimously. The Authority adjourned the Executive Session at 7:50 p.m. and commenced with the regular meeting.
2. RCSTP REPORTS
A. Brickhouse Report – Dave reported that progress towards the completion of Phase II of the Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project continued. Progress was achieved towards the installation of conduit and wiring for the equipment, control panels, sensor, light fixtures and general switches and receptacles within the sludge dewatering building. An August 17, 2010 date has been scheduled for start-up and training of the sludge dewatering equipment. Processing of sludge through the equipment is planned at the same time.
The ETMA Staff installed the drain piping from the existing building and connected it to the collection box prior to the influent wet well. Use of the treatment facility laboratory for process control testing has been utilized since the installation of the drain piping.
The interior and exterior painting of Davco tank #1 was completed. In addition, the hydrostatic testing was completed and passed the test. The interior of Davco tank #2 was completed with the exterior scheduled to be completed the week of August 9, 2010.
Operation of the SBRs and related equipment continued during the month. Paul Christensen of Siemens was on site from July 19 through the 22nd to provide troubleshooting and training. Adjustment to the programming was made in conjunction with Siemens and their
MA Minutes 08/09/2010 1
2 of 6
programming subcontractor ICI. During the troubleshooting process, the SBR trend data indicates that a high organic loading may be present during the morning flows (ranging from 5:00 AM through Noon). This high loading adversely affects approximately two (2) cycles of the SBR process. Investigation towards identifying and quantifying the diurnal loading is ongoing. The aluminum sulfate chemical feed system activation has been delayed due to programming, wiring and pump operation issues.
A meeting between representatives from the Municipal Authority and the Authority’s Solicitor was conducted on August 5, 2010 to discuss the outstanding claims by Wm. H. Clinger Corporation.
B. Pennoni – See #6 below.
C. Cost Summary – Report was reviewed.
D. Change Orders – None
E. Proposal for H2O Audit dated July 1, 2010 was received indicating an estimated fee of approximately $6,500.00. Joe moved to accept the proposal for certification of the grant. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
F. An auto dialer for the Davco side of the plant is missing and a new one needs to be purchased. Mark received pricing from 2 vendors which range from $4,190.00 to $5,340.00 (ACS). He recommends the purchase of the unit from John Laidley for $4,190.00. Joe asked Mark to file a police report for the old unit. Joe moved to approve the purchase of an auto dialer for $4,190.00. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
G. An estimate to complete engineering services from Pennoni covering the period June 21, 2010 to August 27, 2010 is $44,700.00. Joe moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
H. Fran moved to approve the sale of unneeded equipment. Joe seconded the motion. There was no further discussion. The motion passed unanimously.
RCSTP CHANGE ORDERS
A. None.
3. RCSTP INVOICES
A. Fastenal, #PAMAV3967, 6/20/10, $193.93. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
MA Minutes 08/09/2010 2
3 of 6
B. Lenni Electric, #100646, 6/29/10, $1,019.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
C. Gawthrop Greenwood, #80671, 6/30/10, $266.00 and #81707, 7/31/10, $323.00. Joe moved to approve payment of both invoices totaling $589.00. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
D. Hammond & McCloskey, #4616, 7/12/10, $328.70. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
E. Hach, #6818668, 7/15/10, $154.23, and #6820686, 7/16/10, $347.26. Fran moved to approve payment of both invoices. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
F. Northern, #22150896, 7/27/10, $1,599.97. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
G. Pennoni, #446542, 7/29/10, $17,302.63. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
H. Worth, App #20, 7/31/10, $426,170.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
I. Clinger, App. #16, 8/1/10, $42,347.24. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
J. Brickhouse, #5483, 8/2/10, $14,911.25. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
K. Office Depot, #526332642001, 7/20/10, $99.99 and #526332974001, 7/16/10, $50.39. Fran moved to approve payment of both invoices. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
L. Newtown, 223327-0, 7/27/10, $649.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
MA Minutes 08/09/2010 3
4 of 6
4. CHAIRMAN’S REPORT
A. Jack mentioned that EPA stated that up to 75% of infiltration is coming in through laterals and most municipalities assume responsibility for laterals.
B. Joe reported on West Goshen meeting that the MTDL lawsuit may go to federal court. Paxon township has now joined the lawsuit.
5. APPROVAL OF MINUTES
A. Fran moved to approve the minutes of the July 12, 2010 regular meeting. Joe seconded the motion. The motion passed unanimously.
6. ENGINEER’S REPORT – Written report from Daniel Barbato
RCSTP Upgrade and Expansion
* Construction phase services continue including: progress meetings with the contractors and Township every other Thursday; observation services continue including coordination and communication with Brickhouse and the Township; receipt, review, and return of contractor submittals; negotiation, review, and approval of Payment Requests.
* A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail.
* An estimate of Pennoni effort to observe the remaining construction, start-up activities, contract close-out, and as-built drawing preparation is being provided separately. The new tentative substantial completion date is August 27, 2010, as presented by Worth and Co. at the August 5, 2010 progress meeting.
RCSTP Soda Ash System
Pennoni has been investigating the Acrison dry chemical feed system for possible application at the RCSTP. Vendor provided cost estimate, purchase has been tabled by the Board.
I/I Metering Project
The Township continues to meter flows at selected locations. Metering data is being reviewed for the period of March through June. Meters are still installed and collecting data. Township to provide updated data.
Ridley Creek Consent Order
The third Semi-Annual Report was prepared and submitted to DEP on March 26, 2010 as required by the CO&A. The next report is due to DEP by September 30, 2010 and will address comments received from Mr. Goldberg on 6/8/2010.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
These documents were provided to the Township for submittal to DEP. Received comments from DEP and in process of addressing.
Marydell PS Elimination Planning
The notification letters (Component 4) and associated documents are being prepared for distribution to planning and health department for their review and comment.
MA Minutes 08/09/2010 4
5 of 6
7. APPROVAL OF INVOICES
A. Gawthrop, #80670, 6/30/10, $570.00 and #81706, 7/31/10, $475.00. Joe moved to approve both invoices totaling $1,045.00. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
B. Maillie, Falconiero & Co., #84681, 6/16/10, $1,900.00. Fran moved to approve payment. Joe seconded the motion. There was no further discussion. The motion passed unanimously.
C. Pennoni, #446544, 7/29/10, $472.50. Joe moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
8. LIAISON REPORTS
A. None
9. FINANCIAL REPORTS
The Breakdown of the 3 budgets ( RCSTP, Operating, and Capital) was reviewed.
10. GOALS
Joe will provide an I & I article for the newsletter.
11. OLD BUSINESS
A. None
12. NEW BUSINESS
A. None
13. CAPACITY REQUESTS
A letter was received from Ross Unruh on behalf of West Pikeland Townshp, which needs to provide public sewage service for a development where many on site, older sewer systems are failing. He was asking if, through a “trade”, would East Goshen be willing to accept 20,000 GPD. Rick will respond that the Authority is interested in exploring this further.
14. SEWER REPORTS
A. Mark Miller reported the following:
Meter: All meters were read on a daily basis. Due to lack of rainfall, the flows are down.
CC Collection: All pumping stations were visited on a daily basis with no problems to report.
R.C.Collection: Pumping stations were visited on a daily basis with no problems to report.
Pumping Station: All pumping stations were cleaned. The stations were visited on a routine basis. We did experience a problem with the transducer at the Barkway Pumping Station.
Ridley Creek Plant: The Public works Department installed a new sewer lateral for the lab and restroom. The lab is up and running and Scott has been running test on a daily basis.
PA One Calls: We received 62 PA One calls for the month of July.
Alarms: 10 alarms for the month of July
All manholes in Bow Tree were replaced because they had large holes in them and water poured in instead of flowing off.
MA Minutes 08/09/2010 5
6 of 6
15. ANY OTHER MATTER
None
16. CORRESPONDENCE
None
17. PUBLIC COMMENT
None
18. ADJOURNMENT
There being no further business, Fran moved to adjourn the meeting. Joe seconded the motion. The meeting was adjourned at 9:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 08-09-10 draft.doc
MA Minutes 08/09/2010 6
7. INVOICES
2 pg
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Page: | 1 |
|---|---|
| Date: | 07/31/2010 |
| Client No: | 6604-01M |
| Invoice No. | 81706 |
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 07/12/2010 RFA |
Review packet for 7/12 meeting of Authority; attend regular meeting of Municipal Authority. | 2.50 | |
| For Current Services Rendered | 2.50 | 475.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.50 | $190.00 | $475.00 |
| Previous Balance | $570.00 |
|---|---|
| Total Current Charges | 475.00 |
| Balance Due | $1,045.00 |
ok
[signature]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
7. INVOICES
b.
1 pg
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Page: | 1 |
|---|---|
| Date: | 08/31/2010 |
| Client No: | 6604-01M |
| Invoice No. | 82225 |
General Authority Services
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 08/09/2010 | RFA | Review packet for 8/9/10 Authority meeting; attend regular meeting of Municipal Authority including executive session regarding Clinger claim. | 3.10 | |
| For Current Services Rendered | 3.10 | 589.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 3.10 | $190.00 | $589.00 |
| Date | Description | Amount |
|---|---|---|
| Previous Balance | $1,045.00 | |
| Total Current Charges | 589.00 | |
| 08/11/2010 | Fee Payment | -1,045.00 |
| Balance Due | $589.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
10. GOALS
2 pgs
DRAFT
2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
SEPTEMBER REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - Completed; Need by 8/11/10 Joe – Mark - Completed; Need by 11/10/10 Dana
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana – Not Completed; 3 rd Quarter (September) Joe - Completed Attended August meeting; 4 th Quarter (December) Jack
- Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10). West Pike Township request received on August 6, 2010, MA directed staff to look into on August 9, 2010
- Implement I & I Plan. - Ongoing – March Report filed
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction.
- Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. SBR Tour conducted on 3/15/10
- Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. SBR Class conducted on 3/15/10
- Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. BoS adopted Resolution 10-106 on 6/15/2010. Revisions sent to PA DEP on 6/16/10. Received DEP 7/13/10 review letter. Currently working on response.
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. BoS adopted resolutions 10-105 and 10-
F:\Data\Shared Data\ABC’S\Municipal Authority\Goals\2010\091310.doc
2 of 2
108 on 6/15/10. Revisions sent to PA DEP on 6/16/10. Received DEP 7/14/10 review letter. Currently working on response.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
- Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Obtained agreement on diversion from West Goshen on 5/13/10.
FUNDING
- H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. We have received the money. Used grant money to pay Worth and Clinger August invoices
F:\Data\Shared Data\ABC’S\Municipal Authority\Goals\2010\091310.doc
15 SEWER REPORTS
a.
1 pg
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Sept. 8, 2010
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | August 2010 Monthly Report |
f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority august report doc..doc
15. SEWER REPORTS
b.
6 pgs
2008 FLOWMETERS
2010 AUGUST 3RD QUARTER
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY GPD | ELLIS LANE READING | ELLIS LANE GPD | PAOLI PIKE READING | PAOLI PIKE GPD | WILSON DRIVE READING | WILSON DRIVE GPD | SUMMIT GPD | NET FLOWS |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.03 | 08/01/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/02/10 | 1,745,451 | 1,008,333 | 14,868,238 | 134,873 | 8,274,914 | 64,220 | 9,540,683 | 74,983 | 20,400 | 809,240 |
| 0.00 | 08/03/10 | 1,746,505 | 1,054,000 | 14,881,664 | 134,260 | 8,280,880 | 59,660 | 9,551,018 | 103,350 | 20,400 | 756,730 |
| 0.00 | 08/04/10 | 1,747,575 | 1,070,000 | 14,895,262 | 135,980 | 8,286,940 | 60,600 | 9,561,963 | 109,450 | 20,400 | 763,970 |
| 0.00 | 08/05/10 | 1,748,656 | 1,081,000 | 14,910,205 | 149,430 | 8,293,025 | 60,850 | 9,574,876 | 129,130 | 20,400 | 741,590 |
| 0.00 | 08/06/10 | 1,749,720 | 1,064,000 | 14,925,263 | 150,580 | 8,299,155 | 61,300 | 9,587,355 | 124,790 | 20,400 | 727,330 |
| 0.00 | 08/07/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/08/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/09/10 | 1,752,749 | 1,009,667 | 14,968,406 | 143,810 | 8,317,982 | 62,757 | 9,616,365 | 96,700 | 20,400 | 706,400 |
| 0.00 | 08/10/10 | 1,753,814 | 1,065,000 | 14,982,940 | 145,340 | 8,324,067 | 60,850 | 9,628,620 | 122,550 | 20,400 | 736,260 |
| 0.00 | 08/11/10 | 1,754,888 | 1,074,000 | 14,998,042 | 151,020 | 8,329,980 | 59,130 | 9,642,355 | 137,350 | 20,400 | 726,500 |
| 1.87 | 08/12/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/13/10 | 1,757,138 | 1,125,000 | 15,031,055 | 165,065 | 8,342,480 | 62,500 | 9,668,615 | 131,300 | 20,400 | 766,135 |
| 0.12 | 08/14/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/15/10 | 20,400 | 0 | ||||||||
| 0.32 | 08/16/10 | 1,760,215 | 1,025,667 | 15,077,435 | 154,600 | 8,361,000 | 61,733 | 9,695,511 | 89,653 | 20,400 | 719,680 |
| 0.00 | 08/17/10 | 1,761,333 | 1,118,000 | 15,093,726 | 162,910 | 8,367,545 | 65,450 | 9,709,314 | 138,030 | 20,400 | 751,610 |
| 0.00 | 08/18/10 | 1,762,397 | 1,064,000 | 15,109,000 | 152,740 | 8,373,742 | 61,970 | 9,721,234 | 119,200 | 20,400 | 730,090 |
| 0.00 | 08/19/10 | 1,764,574 | 2,177,000 | 15,139,259 | 302,590 | 8,386,013 | 122,710 | 9,741,839 | 206,050 | 20,400 | 1,545,650 |
| 0.00 | 08/20/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/21/10 | 20,400 | 0 | ||||||||
| 0.68 | 08/22/10 | 20,400 | 0 | ||||||||
| 0.05 | 08/23/10 | 1,767,746 | 793,000 | 15,186,211 | 117,380 | 8,405,538 | 48,813 | 9,767,101 | 63,155 | 20,400 | 563,653 |
| 0.00 | 08/24/10 | 1,768,836 | 1,090,000 | 15,202,274 | 160,630 | 8,411,890 | 63,520 | 9,776,932 | 98,310 | 20,400 | 767,540 |
| 0.00 | 08/25/10 | 1,769,890 | 1,054,000 | 15,217,571 | 152,970 | 8,418,269 | 63,790 | 9,786,348 | 94,160 | 20,400 | 743,080 |
| 0.00 | 08/26/10 | 1,770,939 | 1,049,000 | 15,232,749 | 151,780 | 8,424,719 | 64,500 | 9,796,274 | 99,260 | 20,400 | 733,460 |
| 0.00 | 08/27/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/28/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/29/10 | 20,400 | 0 | ||||||||
| 0.00 | 08/30/10 | 1,775,036 | 1,024,250 | 15,294,071 | 153,305 | 8,450,008 | 63,223 | 9,827,443 | 77,923 | 20,400 | 729,800 |
| 0.00 | 08/31/10 | 1,776,115 | 1,079,000 | 15,309,019 | 149,480 | 8,456,421 | 64,130 | 9,838,389 | 109,460 | 20,400 | 755,930 |
| 3.07 | 1,053,504 | 149,151 | 61,447 | 107,885 | 777,613 |
| Metric | DAILY LOC | INQUIRER | EG TWP |
|---|---|---|---|
| MONTH TO DATE | 3.07 | ||
| NORMAL MONTH TO DATE | |||
| YEAR TO DATE | 41 | ||
| NORMAL YEAR TO DATE |
f:/data/users/joanna/
2003 flowmeters 8/31/2010 8:46 AM
2 of 6
2008 FLOWMETERS
2010 AUGUST 3RD QUARTER
| HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | SHERMAN | BARKWAY | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| DATE | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 08/01/10 | ||||||||||||
| 08/02/10 | 19,351,973 | 49,973 | 889,745 | 59,233 | 11,631,547 | 259,400 | 101,610,554 | 633,393 | 394,994 | 4,993 | 1,613,144 | 10,733 |
| 08/03/10 | 19,356,890 | 49,170 | 890,371 | 62,600 | 11,664,483 | 329,360 | 101,680,360 | 698,060 | 395,584 | 5,900 | 1,614,144 | 10,000 |
| 08/04/10 | 19,361,582 | 46,920 | 890,968 | 59,700 | 11,698,586 | 341,030 | 101,751,452 | 710,920 | 396,104 | 5,200 | 1,615,159 | 10,150 |
| 08/05/10 | 19,366,313 | 47,310 | 891,569 | 60,100 | 11,733,821 | 352,350 | 101,824,252 | 728,000 | 396,662 | 5,580 | 1,616,241 | 10,820 |
| 08/06/10 | 19,371,006 | 46,930 | 892,154 | 58,500 | 11,767,840 | 340,190 | 101,893,861 | 696,090 | 397,238 | 5,760 | 1,617,300 | 10,590 |
| 08/07/10 | ||||||||||||
| 08/08/10 | ||||||||||||
| 08/09/10 | 19,385,195 | 47,297 | 893,969 | 60,500 | 11,849,615 | 272,583 | 102,083,045 | 630,613 | 398,686 | 4,827 | 1,620,500 | 10,667 |
| 08/10/10 | 19,389,982 | 47,870 | 894,533 | 56,400 | 11,883,833 | 342,180 | 102,152,918 | 698,730 | 399,222 | 5,360 | 1,621,616 | 11,160 |
| 08/11/10 | 19,394,456 | 44,740 | 895,122 | 58,900 | 11,919,000 | 351,670 | 102,222,930 | 700,120 | 399,690 | 4,680 | 1,622,682 | 10,660 |
| 08/12/10 | ||||||||||||
| 08/13/10 | 19,404,195 | 48,695 | 896,320 | 59,900 | 11,992,170 | 365,850 | 102,370,216 | 736,430 | 400,780 | 5,450 | 1,624,838 | 10,780 |
| 08/14/10 | ||||||||||||
| 08/15/10 | ||||||||||||
| 08/16/10 | 19,418,911 | 49,053 | 898,129 | 60,300 | 12,074,525 | 274,517 | 102,561,625 | 638,030 | 402,227 | 4,823 | 1,628,188 | 11,167 |
| 08/17/10 | 19,424,072 | 51,610 | 898,752 | 62,300 | 12,111,250 | 367,250 | 102,635,676 | 740,510 | 402,960 | 7,330 | 1,629,204 | 10,160 |
| 08/18/10 | 19,428,995 | 49,230 | 899,380 | 62,800 | 12,147,351 | 361,010 | 102,708,421 | 727,450 | 403,514 | 5,540 | 1,629,842 | 6,380 |
| 08/19/10 | 19,438,849 | 98,540 | 900,562 | 118,200 | 12,213,780 | 664,290 | 102,847,421 | 1,390,000 | 404,733 | 12,190 | 1,629,842 | |
| 08/20/10 | ||||||||||||
| 08/21/10 | ||||||||||||
| 08/22/10 | ||||||||||||
| 08/23/10 | 19,454,131 | 38,205 | 902,522 | 49,000 | 12,300,498 | 216,795 | 103,045,445 | 495,060 | 406,396 | 4,158 | 1,629,842 | |
| 08/24/10 | 19,459,009 | 48,780 | 903,136 | 61,400 | 12,333,463 | 329,650 | 103,115,368 | 699,230 | 406,896 | 5,000 | 1,630,678 | 5,016 |
| 08/25/10 | 19,463,785 | 47,760 | 903,732 | 59,600 | 12,364,969 | 315,060 | 103,183,766 | 683,980 | 407,420 | 5,240 | 1,631,722 | 10,440 |
| 08/26/10 | 19,468,424 | 46,390 | 904,300 | 56,800 | 12,396,921 | 319,520 | 103,252,123 | 683,570 | 407,874 | 4,540 | 1,632,822 | 11,000 |
| 08/27/10 | ||||||||||||
| 08/28/10 | ||||||||||||
| 08/29/10 | ||||||||||||
| 08/30/10 | 19,488,149 | 49,313 | 906,906 | 65,150 | 12,506,554 | 274,083 | 103,504,771 | 631,620 | 410,156 | 5,705 | 1,637,285 | 11,158 |
| 08/31/10 | 19,493,546 | 53,970 | 907,477 | 57,100 | 12,541,248 | 346,940 | 103,574,689 | 699,180 | 410,711 | 5,550 | 1,638,393 | 11,080 |
| 47,989 | 59,434 | 324,438 | 683,558 | 5,412 | 8,486 | |||||||
f:/data/users/joanna/
2003 flowmeters
8/31/20108:46 AM
3 of 6
2010 SUMMARY OF METER READINGS
| WESTTOWN WAY |
ELLIS LANE |
PAOLI PIKE |
WILSON DRIVE |
SUMMIT | HERSHEY MILL |
ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,425,517 | 123,265 | 81,325 | 63,991 | 20,400 | 83,711 | 103,900 | 363,921 | 882,367 | 5,627 | 13,543 |
| FEBRUARY | 1,462,759 | 132,866 | 74,793 | 70,879 | 20,400 | 77,500 | 103,327 | 332,371 | 906,362 | 5,456 | 13,156 |
| MARCH | 1,603,009 | 170,328 | 75,607 | 63,240 | 20,400 | 102,840 | 146,865 | 404,526 | 1,071,132 | 5,071 | 19,213 |
| APRIL | 59,434 | 174,279 | 89,043 | 67,148 | 20,400 | 85,455 | 126,703 | 386,665 | 991,262 | 5,303 | 13,956 |
| MAY | 1,317,648 | 145,694 | 87,062 | 54,671 | 20,400 | 63,587 | 86,855 | 355,426 | 836,562 | 5,802 | 11,248 |
| JUNE | 1,225,309 | 126,607 | 78,857 | 70,230 | 20,400 | 57,796 | 67,285 | 353,596 | 802,473 | 5,804 | 11,194 |
| JULY | 1,106,553 | 128,794 | 61,615 | 108,460 | 20,400 | 51,263 | 61,149 | 332,264 | 727,562 | 4,751 | 10,465 |
| AUGUST | 1,053,504 | 149,151 | 61,447 | 107,885 | 20,400 | 47,989 | 59,434 | 324,438 | 683,558 | 5,412 | 8,486 |
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,156,717 | 143,873 | 76,219 | 75,813 | 20,400 | 71,268 | 94,440 | 356,651 | 862,660 | 5,403 | 12,658 |
To
West Goshen 860,812
2010 flowmeters -all-stations separate month worksheets.xlsSUMMARY
4 of 6
August Precip. 3.07 - 2010
[Bar chart showing daily precipitation in August 2010, with a total bar at position 34 reaching 3.07, and major daily bars at day 13 (approx. 1.85), day 23 (approx. 0.67), day 17 (approx. 0.31), day 15 (approx. 0.12), day 24 (approx. 0.05), and day 2 (approx. 0.04).]
Y-axis label: Precip. (values: 0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5)
X-axis label: snow/rain (values: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34)
Legend: August
5 of 6
Monthly Totals 2010 (Jan-Dec)
[3D bar chart showing monthly precipitation totals for 2010 from Month 1 through Month 8, with Months 9 through 12 empty.]
Y-axis label: Precip. (values: 0, 1, 2, 3, 4, 5, 6, 7, 8, 9)
X-axis label: Month (values: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
Legend: Monthly Totals
6 of 6
Flowmeters August 2010
[Line chart showing daily flowmeter readings for August 2010 across days 1 to 30, with readings generally around 700,000 to 800,000, drops to 0 on weekend days (6, 7, 11, 13, 14, 19, 20, 21, 26, 27, 28), and a peak near 1,540,000 on day 18.]
Y-axis label: Flow#s (values: 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000, 1600000, 1800000)
X-axis label: Day of the Month (values: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30)
Legend: August
Monthly Totals 2010 Jan-Dec
[Bar chart showing daily flowmeter readings grouped by month from January through August 2010, with September through December empty.]
Y-axis label: Flowmeters (values: 0, 500000, 1000000, 1500000, 2000000, 2500000)
X-axis label: Month (values: January, February, March, April, May, June, July, August, September, October, November, December)
17. CORRESPONDENCE
2.
5 pgs
WEST GOSHEN SEWER AUTHORITY
REGULAR MEETING
August 4, 2010
The regular meeting of the West Goshen Sewer Authority was held on Wednesday, August 4, 2010 at the STP Administration Building. Those present were:
| Authority Walter Hoover Kevin Snoke Frank Biasi Dave Johnson Ron Rothrock, Alt. |
Supervisor Dr. White Administration John Scott |
Unruh, Turner Ross Unruh Glace Associates, Inc. Max Stoner |
|---|
John Windle, Ken Fuller, Mike Arnold and Ron Rothrock were absent. Joe Mc Cauley from East Goshen Township was present.
The regular meeting of the Authority was called to order at 7:33 P.M. by Chairman, Walter Hoover. The Chairman then called for approval of the minutes from the July 7, 2010 meeting. On motion by Frank Biasi, seconded by Kevin Snoke, the minutes were unanimously approved.
Ross Unruh presented the Solicitor's Report for the month. Ross attended the EHB conference and stated that the judge doesn't believe he has jurisdiction with regard to the TMDL's. Ross advised the members that he feels they should drop the TMDL's as part of the appeal. Kirkland Woods developer getting ready to get started, they have been in contact with Max and Ross. Unruh is still awaiting the escrow for Wexford Mews. The grinder pump agreement has been prepared and sent out for Liberty Tools and he is awaiting a response. The right of way papers for the South Concord Road project have been sent out but have received no reply. The dimensional variance has been granted for the Glen White Subdivision.
Max Stoner gave the Engineers report dated August 4, 2010: (See report for details)
- Current Items Pumping Station Nos. 1 & 6 Upgrade General construction work has a few minor items to be done at PS#1 by the plant staff.; Goose Creek Stream Study/TMDL Permit Issues The TMDL issues are winding their way through the court system and EHB.; East Goshen Proposed Diversion of Flows Nothing new this month.; Washington Street Pump Station Blooming Glen Contractors continue to work at the station. Brandywine Electrical has
1
2 of 5
been working on running conduit and wiring.
e) Tapping Fees
These are still being worked on and should be ready for adoption at the next meeting.
- The Arbours at West Goshen – Nothing New This Month
- Benson Townhouses-The Links Nothing New This Month
- Goshen Leisure Development Nothing New This Month
- The Jefferson at Matlack Street This project may not proceed. Nothing new this month.
- Dash Enterprises- This is located in the 300 block of Westtown Road, combining three previous residential Lots into one lot for a car dealership. The parking area has been completed. Dash has submitted a land development plan for an automobile storage lot at 716 East Union Street which was approved by the planning commission at their July 2009 meeting.
- Zarelli Subdivision 825 Goshen Road Nothing new this month.
- Margarita’s Site Development Waiting for as-built plans. Nothing new this month.
- Wexford Mews Waiting for as-built plans. Nothing new this month.
- Chester County Hospital - Nothing New This Month
- Jerrehian Estate Large Tract Glace has started to review the sanitary sewer plans for the proposed 598 unit development. They are still proposing two (2) pumping stations. They have provided preliminary plans. We are considering possible tie-ins to Hamilton Woods and portions of the Caswallen development. The review has been completed with no major issues on the proposed design, the review letter was sent out last month. Small Tract They are still waiting for their NPDES Permits for this 25 lot subdivision and are prepared
2
3 of 5
to proceed with final approval. Their engineer provided the additional paperwork for final approval from Max. An escrow account for construction needs to be established and they need to enter into a sewer extension agreement with the Authority.
- Greehill Corporate Park – Lot 11 Drury Development Company is proposing a 2 ½ story 34,480 s.f. office building at 1171 McDermott Drive. There are no major issues with the sewer for this proposed project. this was approved at the planning commission in July.
- Village of Shannon – Shadeland Woods Nothing New This Month
- Lincoln Independence Park Nothing New This Month
- South Concord Road / Glenn White Subdivision This is a 20-lot single family residential subdivision of a portion of the Rolling Green Cemetery north of Amelia Drive. The second plan review is complete. There are some existing homes which may be able to connect to their proposed gravity collection system. The developer has agreed to provide a right of way to serve existing homes in the area. As per the Authority’s previous policy the Authority would reimburse the developer for the actual cost of the sewer main extension.
- DLH Development – Reservoir Property Waiting for as-built drawings and dedication documents. D.L. Howell relocated their office to one of these buildings earlier this month.
- Turner Square Commercial development on the site of Frank’s Nursery at the northeast intersection of Paoli Pike and Turner Lane. A restaurant has recently opened but the other fronts are still vacant. Nothing new this month.
- Gavin Property – 415 Goshen Road Nothing New This Month
- Liberty Tools This property will be served by a grinder pump. They have proposed to tie a few other lots into the low pressure system. John Scott has agreed with this concept which was done on Delaware Avenue and Wexford Mews. Ross has been discussing individual grinder pump agreements for each property that will connect to the system with the attorney for Liberty Tools. Nothing new this month.
- Kirkland Woods This is a new 7 lot sub-division on 4.3 acres, located at Kirkland Avenue and Ashbridge Road. The sanitary sewer main needs extended but no rights of ways are involved. A developer’s agreement will need to be entered into between the Authority and the developer. The plan received approval from the Township and they have contacted Ross and our office to establish a construction escrow account. They reviewed and approved the construction escrow account.
3
4 of 5
- QVC Warehouse QVC is planning an approximately 60,000 s.f. addition to its warehouse. There appear to be no significant issues with the sanitary sewer system for the proposed addition.
- R.E. Michel This is a proposed 14,542 s.f. warehouse/storage/office HVAC facility to be constructed on the existing R.E. Michel property on the south side of Westtown Road. No major issues with the sewer for this proposed project. This project is currently under construction.
The following invoices and requisitions were moved for approval by Kevin Snoke, seconded by Frank Biasi, and unanimously approved:
ADMINISTRATIVE EXPENSES:
| PAYEE | PURPOSE | AMOUNT |
|---|---|---|
| Unruh | General Representation | $ 891.81 |
| Unruh | WGT – ZHB Application | $ 215.00 |
| $ | ||
| $ |
DEVELOPER ACCOUNTS:
| PAYEE | DEVELOPER | AMOUNT |
|---|---|---|
| Unruh, Turner | South Concord Road – Glen White | $ 288.00 |
| Glace & Assoc. | South Concord Road – Glen White | $ 318.04 |
On a motion by Dave Johnson, and seconded by Kevin Snoke, the following bills were approved for payment.
BOND REMEMPTION & IMPROVEMENT FUND:
| REQUISITION # | PAYEE | PURPOSE | AMOUNT |
|---|---|---|---|
| 1397 | Brandywine Electrical | Washington Street PS | $ 5,843.40 |
| 1395 | Glace & Associates | Garage, Washington St. PS TMDL | $ 976.28 |
4
5 of 5
| 1398 | Hall & Associates | Periphyton Group NPDES Permit Chester Creek TMDL |
$ 2,165.94 |
|---|---|---|---|
| 1399 | Unruh, Turner, Burke & Frees | Appeal to EHB | $ 4,839.50 |
| 1396 | Blooming Glen | Washington Street PS | $ 19,327.32 |
TRUSTEE BALANCES (as of June 30, 2010)
Tapping Fee - $6,422,532.40
BR&I - $ 3,904.28
Kevin Snoke – Sewer escrow agreement for Mr. & Mrs. Jones
John Scott – nothing
Dr. White – Still no police contract.
Dave Johnson made a motion to approve a change order for replacing the pump piping supports at Washington Street PS, for Blooming Glenn in the amount of $2,737.00, seconded by Kevin Snoke, and unanimously approved.
Dave Johnson made a motion to approve a change order for changing the voltage from 400 to 800 to be able to run both pumps at one time at Washington Street PS, for Brandywine Electric in the amount of $2,820.00, seconded by Kevin Snoke, and unanimously approved.
There being no further business, on motion by Frank Biasi, seconded by Kevin Snoke, the meeting was adjourned at 8:21 p.m.
Respectfully submitted,
Tina Charron, Recording Secretary
5
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
August 11, 2010
Michael L. Grogg
Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
Re: Applebrook Golf Course
East Goshen Township
Chester County
Dear Michael:
Following up on our conversation back in late April the Applebrook Golf Club who would be the primary beneficiary of the Applebrook Spray Irrigation permit has agreed to fund the Comprehensive Groundwater Evaluation need to keep the Water Quality Management Permit (Permit No. 1500410) active.
The Authority Engineer will commence work on the Evaluation and I will forward it to you once it has been completed.
What if anything do I need to do to “officially” renew the Water Quality Management Permit?
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Louis F. Smith, Jr.
Township Manager
Cc: Daniel Barbato, PE
Municipal Authority ✓
F:\Data\Shared Data\Public Works Dept\Sewer\Ridley Creek\Applebrook Irrigation\Ground Water Monitoring\Letter to PADEP 081110.doc
NAVARRO & WRIGHT
CONSULTING ENGINEERS, INC.
August 27, 2010
Authority Members
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Re: Energy Costs
Dear Authority Members:
The Pennsylvania Legislature, through Act 39 (formerly Act 77), the Guaranteed Energy Savings Act, provided municipal authorities with a means to leverage wasted utility dollars and redirect those dollars to fund necessary facility improvements. This is typically achieved through the use of an Energy Services Company (ESCO). This innovative approach to project delivery can provide a means for your community to fund much needed energy efficiency improvements at no additional cost to the local ratepayers. These facility improvements will assist in reducing overall energy consumption while providing the added benefit of making the community more environmentally friendly.
An ESCO, or Energy Service Company, is a business that designs and implements facility improvement projects to increase energy efficiency and decrease maintenance costs for a variety of public facilities. ESCOs can undertake a wide range of tasks and assume the technical and performance risk associated with the project. Typically, they offer the following services:
- develop, design, and arrange financing for energy efficiency projects;
- install and maintain the energy efficient equipment involved;
- measure, monitor, and verify the project's energy savings; and
- assume the risk that the project will save the amount of energy guaranteed.
These services are bundled into the project's cost and are repaid through the dollar savings generated. The savings amount available for re-investment is guaranteed by the ESCO. If the actual energy savings are less than the represented savings, the ESCO is essentially responsible for payment of the shortfall.
The comprehensive energy efficiency retrofits that are typical of many ESCO projects require a large initial capital investment and have a relatively long payback period. The authority's debt payments are tied to the energy savings achieved by the project so that the capital improvements are funded by leveraging the difference between pre-installation and post-installation energy use and other costs. This method of funding needed improvements is also known as performance contracting. Since the ESCO must legally guarantee the energy savings, ESCOs have led the effort to verify, rather than estimate energy savings.
Corporate Office: 151 Reno Avenue, New Cumberland, PA 17070, Ph: 717-441-2216, Fax: 717-441-2218, www.navarrowright.com
Branch Offices: 09 Main Street, Towanda, PA 18848, Ph: 570-265-3580, Fax: 570-265-3955 | 528 E. Chemung Street, Waverly, NY 14892, Ph: 607-565-7225 | 849 International Drive, Suite 215, Linthicum, MD 21090, Ph: 443.270.5181, Fax: 410.859.9958
Performance-based energy efficiency projects can include the maintenance of all or some portion of the new high-energy equipment over the life of the contract. The cost of this ongoing maintenance is folded into the overall cost of the project. Under this approach, the authority receives the benefit of reduced maintenance costs, in addition to reduced energy costs. Another critical component of every energy efficiency project is the education of the municipal authority about its energy use patterns. This helps the authority better understand and manage its energy use in order to control costs.
In these difficult economic times, the sound fiscal management of limited financial resources requires the careful review and consideration of every dollar that is spent by the community. This sometimes requires exploring new and creative means for financing much needed projects to upgrade public facilities and reduce energy consumption at no additional cost to the local ratepayers. N&W’s professional staff can provide you with more information on the ESCO program and assist your community in realizing the benefits of this innovative budget-neutral facilities improvement program. We will be contacting you shortly to discuss how this program can be of benefit to your community. In the meantime, if you would like to learn more about the ESCO program, please call 717-441-2216 and speak with Paul J. Navarro, P.E. or Vaughan S. Leer, P.E.
Sincerely,
| Vaughan S. Leer, P.E. Senior Project Manager |
Paul J. Navarro, P.E. President |
|---|
VSL:PJN
Enclosures
Why PA Act 39?
What is PA ACT 39?Technical solution to a financial problem Act 39 Legislation facilitates and encourages:
NAVARRO & WRIGHT 151 Reno Avenue Phone: 717-441-2216 [Photo of a stone arch balanced on rocks against a blue sky] |
WHY PA ACT 39?
ENERGY CONSERVATION MEASURES TO INVESTIGATEInvestigation of everything that spins the utility meters - goal is to pull money away from utilities and invest in facility improvements:
Direction from Municipality as to Wish List items WHAT IS AN ESCO?
|
|---|
Examples of ESCO Capabilities/Projects
|
Building Automation System Upgrades
Lighting Upgrades
Renewable Capabilities
Water Conservation
|
HVAC System Upgrades
Building Envelope
Central Plant Upgrades
Plant Improvements
|
|---|
2010 PMAA Administrative/Environmental Issues Seminar
Tuesday, October 26, 2010
Nittany Lion Inn
State College, Pennsylvania
RECEIVED
BY: [stamp: SEP -7 2010]
| 8:00-9:00 | Continental Breakfast |
|---|---|
| 8:15-9:00 | Registration |
| 9:00-9:15 | Association Legislative Update - PMAA Government Relations Staff will address attendees on current legislative and regulatory issues as the state deals with the current fiscal crisis. |
| 9:15-9:50 | Solicitor’s Panel - PMAA Solicitors and Government Relations staff will discuss the various issues associated with the recent permit extension law. This law will impact sprinkler system requirements, DEP permitting, and local building permits. |
| 9:50-10:00 | Break |
| 10:00-11:00 | (2) Concurrent Breakout Sessions (I) Capital Asset Management - Large or small, utilities are capital intensive as opposed to labor-intensive operations. Management of capital fixed assets affects, for better or worse, the effectiveness of your Authority. This session will present concepts & principles to employ a fixed asset management process tailored for your utility, yielding a solid return on investment. topics discussed will include “right sizing” solutions to your scale of operations. (II) Inflow and Infiltration – Best Practices - Problems with storm and sanitary systems are complicated, expensive and environmentally critical. This lecture will focus on describing best practices for maintenance, I&I investigation/elimination, and contracting for these complex scopes of work. |
| 11:00-11:30 | (2) Concurrent Breakout Sessions (I) PMAA Leadership Development Series - Dering Consultants’ Paul Caulfield will address the attendees on the planned 2011 PMAA Leadership Development curriculum. Curriculum includes modules to be presented at the various PMAA meetings and conference held throughout the year. Modules may include leadership, management and supervisory development, teambuilding, communications, problem solving, business and technical writing, customer service and project, stress and time management skills. The curriculum/series is directed toward developing the future leaders/managers/supervisors of our community systems. (II) PennBid - This session is designed to inform municipal authorities about the new online bidding and document management tool now available to them and their engineers. Recent changes to PA’s procurement laws have enabled the streamlining of bids and the bid solicitation process allowing for significant cost savings available through the tools utilized by PennBid. |
| 11:30-1:00 | Panel Presentation: Marcellus Shale Water Issues - Susquehanna River Basin Commission, industry lobbyists, PMAA volunteers, Penn State Marcellus Outreach personnel and DEP regulators will participate in a panel presentation to discuss important water and wastewater issues associated with the Marcellus Shale development. |
| 1:00- 2:00 | Luncheon |
Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401, Wormleysburg, PA 17043
(717) 737-7655 ● (717) 737-8431 Fax ● email: info@municipalauthorities.org ● www.municipalauthorities.org
Registration Form
2010 PMAA Administrative/Environmental Issues Seminar
Name: __________________________________________________________________________
Authority/Firm: _________________________________________________________________
Address:_________________________________________________________________________
City: ____________________ State: ________ Zip: ___________ Phone: _________________
Fax: ____________________ E-mail: ________________________________________________
Name: __________________________________________________________________________
Authority/Firm: _________________________________________________________________
Address:_________________________________________________________________________
City: ____________________ State: ________ Zip: ___________ Phone: _________________
Fax: ____________________ E-mail: ________________________________________________
Name: __________________________________________________________________________
Authority/Firm: _________________________________________________________________
Address:_________________________________________________________________________
City: ____________________ State: ________ Zip: ___________ Phone: _________________
Fax: ____________________ E-mail: ________________________________________________
☐ PMAA Member Registration - $75.00
☐ Non-PMAA Member Registration - $85.00
TOTAL DUE: $_____________
Hotel Accommodations - contact the Nittany Lion Inn at 800-233-7505. PMAA room block rate is available until September 21, 2010.
Mail registrations to the address listed below. Payment is due with registration. Checks should be made payable to PMAA. We also accept ☐ Visa ☐ MasterCard ☐ Discover
Card # _______ _______ _______ _______ Exp.: ___________
3 digit security code on the back of the credit card: ___________
Cancellation Policy
Cancellations received less than 72 hours in advance are not subject to a refund. Cancellations must be sent in writing to our office. If a cancellation notice is not received, payment is still due.
Unpaid no-shows will be charged.
Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401, Wormleysburg, PA 17043
(717) 737-7655 ● (717) 737-8431 Fax ● email: info@municipalauthorities.org ● www.municipalauthorities.org