Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

October 11, 2010
Monday, 7:00 PM

Please note that the Authority will meet in executive session to discuss a pending legal matter from 7:00 pm to 8:00 pm

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. EXECUTIVE SESSION – PENDING LEGAL MATTER 7:00 pm TO 8:00 pm
  3. RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Cost Summary Report 10/6/10; Change Orders – none
  4. RIDLEY CREEK INVOICES a. Grainger, #9355202699, 10/23/10 $ 212.40 b. Yale Electric Supply, #7223322-01, 9/20/10 $ 88.32 c. Yale Electric Supply, #7223479-01, 9/21/10 $ 114.76 d. Acton, #PRI0664628, 9/30/10 $ 305.00 e. S. Bahnatka, 9/17/10 $ 450.00 f. M&S Service Co., Inc. #7522-0, 9/7/10 $ 4,190.00 g. Hammond & McCloskey, #4721, 9/10/10 $ 851.22 h. Main Line Concrete, #265721, 8/25/10 $ 357.50 i. Pipe Xpress, #48065, 9/1/10 $ 465.02 j. Pipe Xpress, #48102, 9/7/10 $ 86.25 k. EGT, Reimbursement, 9/4/10 $ 388.60 l. Home Depot, 9/9/10 $ 133.27 m. Lowe’s, 9/10/10 $ 344.98 n. Lowe’s, 9/10/10 $ 79.55 o. Pennoni #452026, 9/29/10 $12,521.81 p. Worth Invoice q. Brickhouse Environment, #5559-A, 10/1/10 $ 6,785.00 r. Brickhouse Environmental, #5559, 10/1/10 $10,695.00
  5. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  6. APPROVAL OF MINUTES September 13, 2010
  7. ENGINEER’S REPORT Pennoni Report
  8. APPROVAL OF INVOICES a. Pennoni # 452079, 9/29/10 $ 918.75 b. Pennoni # 452027, 9/29/10 $ 517.50
  9. LIAISON REPORTS
  10. FINANCIAL REPORTS September Report; Approval of the Preliminary 2011 Budget

Monday, October 11, 2010

- 1 -

  1. GOALS September Report
  2. OLD BUSINESS Comprehensive Plan Goals
  3. NEW BUSINESS Consider recommendation to increase Pennoni 2010 Annual Services Budget by $3,000
  4. CAPACITY REQUESTS None
  5. SEWER REPORTS Director of Public Works Report – September 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - 2010; Artesian Ridley Creek Report –2010
  6. ANY OTHER MATTER
  7. CORRESPONDENCE AND REPORTS OF INTEREST WGT 8/4/10 Meeting Minutes
  8. PUBLIC COMMENT
  9. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Delivery date
November 10, 2010 January 1, 2011

Monday, October 11, 2010

- 2 -

[Handwritten note: 3. RIDLEY CREEK REP C. 10 pgs]

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY

October 6, 2010

Includes bills paid at 9/13 meetings

Name Budget or Contract amt. This Month To Date Balance on Budget or Contract % of work completed
RECEIPTS
Bond $9,500,000.00 $0.00 $9,500,000.00
Pennoni (rechargable) $20,000.00 $0.00 $20,000.00
Grant $464,195.00 $0.00 $464,195.00
RECEIPTS TOTAL $9,984,195.00 $0.00 $9,984,195.00
EXPENSES
Borrowing costs $52,250.00 $0.00 $52,250.00 $0.00 100.00%
Worth $7,865,400.00 $227,050.00 $7,366,815.62 $498,584.38 93.66%
    change orders -$1,400.64 $0.00 $0.00 -$1,400.64 0.00%
Clinger $974,000.00 $30,597.44 $950,777.64 $23,222.36 97.62%
    change orders $33,312.24 $0.00 $0.00 $33,312.24 0.00%
Pennoni (Inspection) (05) $136,200.00 $0.00 $136,197.62 $2.38 100.00%
Pennoni (Continued Services) (10) $177,900.00 $12,393.25 $158,702.61 $19,197.39 89.21%
Pennoni (Rechargeable) (06) $20,000.00 $0.00 $12,961.75 $7,038.25 64.81%
Brickhouse $175,000.00 $14,087.50 $154,802.50 $20,197.50 88.46%
Extras
Capital $459,337.40 $4,836.38 $106,245.56 $353,091.84 23.13%
Capital (Identified but not paid) $80,196.00 $0.00 $0.00 $80,196.00 0.00%
Trailer, Phone, Porta Pot & Internet $12,000.00 $0.00 $11,520.18 $479.82 96.00%
EXPENSES TOTAL $9,984,195.00 $288,964.57 $8,950,273.48 $1,033,921.52 89.64%

We have identified $51,357 in potential extras.

Retainage (10% until 50% of the project is done then it drops back to 5%)

Worth $387,728.72 5%
Clinger $51,794.25 5%
Total $439,522.97

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls SUMMARY V2

[Handwritten note: 2 of 10]

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS

October 6, 2010

WORTH

NO. AMOUNT APPROVED WORK STATUS PAID
1 $3,209.70 2/24/09 BLOWER #1 REPAIR APPROVED NO
4 $5,542.80 5/11/09 BLOWER #2 REPAIR APPROVED NO
? $4,617.08 ???? BLOWER #3 REPAIR APPROVED NO
3 $2,703.00 12/14/09 ANTI-FLOT COLLAR APPROVED NO
5 $6,784.65 12/14/09 LARGER MIXER FOR FLOC TANK APPROVED NO
15 $4,494.52 12/14/09 REMOVABLE RAILS ON SBR TANK APPROVED NO
17 $6,126.78 3/8/10 BLOWER #4 REPAIR APPROVED NO
8 -$6,250.00 3/8/10 CREDIT FOR CAST IRON PIPE APPROVED NO
-$20,000.00 2/8/10 Credit for Electric Wages APPROVED NO
9 -$50,000.00 2/8/10 Credit for paving APPROVED NO
19 $27,702.20 5/20/10 air drops APPROVED NO
20 $3,516.77 5/20/10 2 doors APPROVED NO
21 $18,094.59 5/20/10 Paint DAVCO WALKWAYS APPROVED NO
22 -$13,875.00 5/20/10 Credit for concrete APPROVED NO
24 $5,932.27 6/14/10 Additional block for sludge building APPROVED NO
Total -$1,400.64

CLINGER

NO. AMOUNT APPROVED WORK STATUS PAID
1 $5,106.00 Denied EXTEND 34 KV LINES DENIED
2 $23,585.00 7/1/09 CORNER UNIT FOR MCC APPROVED NO
3 $3,171.00 4/12/10 Applebrook Pump APPROVED NO
4 $1,451.24 3/23/10 Cables for 2 chart recorders APPROVED NO
Total $33,313.24

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls CHANGE ORDERS

[Handwritten note: 3 of 10]

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS

October 6, 2010

Potential capital extras
Pipe conduit Conflicts $10,000
Controls
Sludge room retrofit $0
HVAC Thermostats $10,000
Cathode Protection $0
Treatment Tanks $20,000
Electrician (increase in wages) $11,357
UV Channel
Total potential extras $51,357 $51,357
Potential Receipts
Total Potential Receipts $0 $0

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls POTENTIAL EXTRAS

4 of 10

EAST GOSHEN MUNICIPAL AUTHORITY

RIDLEY CREEK CAPITAL EXPANSION PROJECT

DETAIL

October 5, 2010

Date Amount Subtotals Name Description
Worth
2/9/2009$561,150.00Worth & CompanyApplication #1
3/9/2009$480,825.00Worth & CompanyApplication #2
4/9/2009$768,780.00Worth & CompanyApplication #3
5/8/2009$125,352.90Worth & CompanyApplication #4
5/31/2009$485,103.12Worth & CompanyApplication #5
6/30/2009$267,975.00Worth & CompanyApplication #6
7/31/2009$138,217.50Worth & CompanyApplication #7
8/31/2009$679,793.40Worth & CompanyApplication #8
9/30/2009$504,310.98Worth & CompanyApplication #9
9/30/2009$222,861.55Worth & CompanyApplication #10 (5% retainage)
10/31/2009$724,089.05Worth & CompanyApplication #11
11/30/2009$379,360.17Worth & CompanyApplication # 12
12/31/2009$374,772.62Worth & CompanyApplication #13
1/31/2010$207,881.86Worth & CompanyApplication # 14
2/28/2010$69,077.35Worth & CompanyApplication # 15
3/31/2010$75,857.50Worth & CompanyApplication # 16
4/30/2010$170,263.75Worth & CompanyApplication # 17
5/31/2010$178,290.62Worth & CompanyApplication #18
6/30/2010$299,633.25Worth & CompanyApplication #19
7/30/2010$426,170.00Worth & CompanyApplication #20
8/31/2010$227,050.00Worth & CompanyApplication #21
$7,366,815.62$7,366,815.62
Clinger
4/9/2009$22,152.64ClingerApplication #1
5/8/2009$15,714.77ClingerApplication #2
5/31/2009$77,973.43ClingerApplication #3
6/30/2009$12,567.46ClingerApplication #4
8/30/2009$10,855.98ClingerApplication #5
9/30/2009$111,255.75ClingerApplication #6
10/31/2009$59,344.83ClingerApplication #7
11/30/2009$145,354.05ClingerApplication # 8
12/31/2009$94,727.00ClingerApplication # 9
1/31/2010$139,092.94ClingerApplication # 10
2/28/2010$58,514.64ClingerApplication # 11
2/28/2010$41,530.78ClingerApplication # 12 (5% retainage)
$13,575.79ClingerApplication #13
5/2/2010$34,539.38ClingerApplication # 14
6/30/2010$40,633.52ClingerApplication #15
8/1/2010$42,347.24ClingerApplication # 16

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls DETAIL

[Handwritten note: 5 of 10]

Date Amount Subtotals Name Description
8/31/2010 $30,597.44 Clinger Application #17
$950,777.64 $950,777.64
Pennoni
? $712.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU ?
10/30/2008 $943.50 PENNONI ASSOCIATES INC. RCSTP EXP. PROJ. SERV. THRU 10/19/08
12/5/2008 $18,115.98 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 11/30/08
1/15/2009 $12,929.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 12/28/08
2/5/2009 $13,352.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009 $31,288.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009 $29,010.46 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009 $22,436.46 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 4/26/09
7/29/2009 $3,528.00 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 7/19/09
12/30/2010 $16,482.50 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 12/31/10
1/29/2010 $24,224.58 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 1/17/10
2/23/2010 $13,057.00 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 2/14/10
4/1/2010 $19,243.40 PENNONI ASSOCIATES INC.
5/5/2010 $18,810.50 PENNONI ASSOCIATES INC. Through 4/18/2010
5/25/2010 $19,287.50 PENNONI ASSOCIATES INC. Through 5/16/2010
6/29/2010 $17,901.25 PENNONI ASSOCIATES INC. Through 6/20/10
7/29/2010 $17,302.63 PENNONI ASSOCIATES INC. Through 7/18/2010
8/26/2010 $12,393.25 PENNONI ASSOCIATES INC. Through 8/15/2010
$291,019.01 $291,019.01
Pennoni (rechargeable)
2/5/2009 $2,840.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009 $4,934.75 PENNONI ASSOCIATES INC. RCSTP EXP. PROJ. SERV. THRU 3/1/09
4/8/2009 $3,777.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009 $1,409.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 4/26/09
$12,961.75 $12,961.75
Brickhouse
5/12/2009 $2,127.50 BRICKHOUSE Apr-09
6/1/2009 $8,452.50 BRICKHOUSE May-09
7/1/2009 $7,791.25 BRICKHOUSE Jun-09
8/3/2009 $9,315.00 BRICKHOUSE Jul-09
9/1/2009 $7,762.50 BRICKHOUSE Aug-09
10/1/2009 $7,417.50 BRICKHOUSE Sep-09
11/2/2009 $7,072.50 BRICKHOUSE Oct-09
12/1/2009 $7,963.75 BRICKHOUSE Nov-09
1/4/2010 $7,762.50 BRICKHOUSE Dec-09
2/1/2010 $7,618.75 BRICKHOUSE Jan-10
3/1/2010 $7,417.50 BRICKHOUSE Feb-10
4/1/2010 $10,005.00 BRICKHOUSE Mar-10
5/3/2010 $11,931.25 BRICKHOUSE Apr-10
6/1/2010 $10,321.25 BRICKHOUSE May-10
7/1/2010 $11,845.00 BRICKHOUSE Jun-10

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls DETAIL

[Handwritten note: 6 of 10]

Date Amount Subtotals Name Description
8/2/2010 $14,911.25 BRICKHOUSE Jul-10
9/1/2010 $14,087.50 BRICKHOUSE Aug-10
$153,802.50 $153,802.50
Extras - Capital - Paid
12/22/2008 $44.98 EAST GOSHEN TOWNSHIP REIMBURSE GEN.FUND FOR OFFICE DEPOT
12/31/2008 $88.00 FASTSIGNS RED ON WHITE ALUM. SIGNS
1/12/2009 $177.00 FASTSIGNS SIGNS - PLEASE AVOID TOWNE DR....
12/1/2008 $36.00 GREAT VALLEY LOCKSHOP KEYS FOR CONTRACTOR
12/8/2008 $160.80 GREAT VALLEY LOCKSHOP PADLOCKS, REKEY CYLINDERS & KEYS
12/29/2008 $474.82 HANSON AGGREGATES INC 36.95 TONS SUBBASE AGGREGATE
12/31/2008 $908.00 HANSON AGGREGATES INC 70.66 TONS SUBGRADE 2 AGGREGATE
12/15/2008 $2,089.39 LENNI ELECTRIC CORPORAT TEMP SERV. FOR TRAILER - RIDLEY CRK
12/31/2008 $120.00 LENNI ELECTRIC CORPORAT SEWER PLANT - GUY WIRE RELOCATE
12/29/2008 $7,865.00 MACANGA INC. TRUCK & TRACKHOE RENTAL 12/5-12/18
12/1/2008 $2,466.00 PATTERSON, MICHAEL J. MATERIALS & LABOR - SPLIT RAIL FENCE
12/1/2008 $4,907.72 PIPE XPRESS INC. COPPER TUBING, BRASS COMP. COUPLING
12/15/2008 $813.74 PIPE XPRESS INC. BURIAL HYDRANT, BRASS CURB STOP, &
12/29/2008 $129.00 RAM-T CORPORATION 2 FT. SILT FENCE
12/1/2008 $1,183.00 RANSOME RENTAL COMPAN CATERPILLAR - TRUCK LOADER RENTAL
12/8/2008 $3,960.00 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 11/13-11/25/08
12/29/2008 $908.00 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 12/15 - 12/18/08
12/31/2008 $1,044.85 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 12/15-12/16/08
12/8/2008 $119.95 SAFETY SOLUTIONS INC. MEDICAL SUPPLIES
12/1/2008 $635.60 US MUNICIPAL SUPPLY INC. CUSTOM SIGNS - RIDLEY CREEK TREATMT
12/31/2008 $157.50 GAWTHROP GREENWOOD LEGAL
1/31/2009 $936.50 GAWTHROP GREENWOOD LEGAL
3/19/2009 $1,246.64 HAMMOND & MCCOMLOSY WATER SERVICE
3/31/2009 $1,254.00 GAWTHROP GREENWOOD LEGAL
4/2/2009 $274.21 PIPE XPRESS INC. YARD HYDRANT #2
4/2/2009 $1,910.28 HAMMOND & MCCOMLOSY WATER PIPING
5/11/2009 $158.69 US MUNICIPAL SUPPLY INC. 3 SIGNS
4/30/2009 $264.86 LENNI ELECTRIC CORPORAT WIRED HOT WATER HEATER
5/31/2009 $133.00 GAWTHROP GREENWOOD LEGAL
6/30/2009 $304.00 GAWTHROP GREENWOOD LEGAL
5/31/2009 $1,481.00 EAST GOSHEN TOWNSHIP BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE)
9/10/2009 $254.85 AGWAY TREE STAKES AND PEAT MOSS
8/25/2009 $1,855.00 HARMONY HILL NURSERIES 16 TREES
8/31/2009 $836.00 GAWTHROP GREENWOOD 2 MONTH LEGAL
11/19/2009 $314.00 VIMCO SEALER FOR FLOORS
10/31/2009 $285.00 GAWTHROP GREENWOOD LEGAL
12/31/2010 $1,414.97 L/B water YARD HYDRANT #2
12/18/2009 $443.48 Grainger Hose Reel 1 inch
12/18/2009 $267.98 Grainger Hose Reel 3/4 inch
2/2/2010 $789.45 Fisher Scientific Lab Equipment
2/28/2010 $57.00 GAWTHROP GREENWOOD LEGAL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls DETAIL

[Handwritten note: 7 of 10]

Date Amount Subtotals Name Description
3/15/2010 $103.96 Matthews Ford Van rental
3/31/2010 $275.50 Grainger Hose
3/31/2010 $247.00 GAWTHROP GREENWOOD LEGAL
4/7/2010 $70.15 GREAT VALLEY LOCKSHOP 6 locks
4/14/2010 $641.98 Grainger Shelving
4/15/2010 $1,127.48 Continetal Fire & Safety 3" & 1.75" Hose
4/16/2010 $28.58 Grainger Phone
3/17/2010 $1,092.01 Water Pollution Biology Michael Geradi - Talk
2/22/2010 $1,104.50 McNichols Safety Grating
5/5/2010 $1,078.38 HAMMOND & MCCMLOSY WATER LINE OFFICE
5/5/2010 $270.10 HAMMOND & MCCMLOSY Hose fitting in storage room
5/3/2010 $2,329.17 Fisher Scientific DESICCATOR & OVEN
5/12/2010 $1,485.63 Fisher Scientific FURNACE
5/21/2010 $456.81 USA Blue book beakers
4/29/2010 $258.00 Marco 3 10Lb dry Chem FX
5/9/2010 $142.47 Staples office equipment
5/31/2010 $1,862.00 GAWTHROP GREENWOOD Legal
5/15/2010 $39,937.70 Aqua Wastewater Mgt Sludge from DAVCO
6/30/2010 $126.63 PIPE XPRESS INC. pipe
6/15/2010 $204.40 GREAT VALLEY LOCKSHOP locks
6/8/2010 $150.00 O'Rourke and Sons Bend counter tops
6/29/2010 $615.00 PENNONI Soda Ash
7/20/2010 $99.99 Office Depot Printer
7/16/2010 $50.39 Office Depot Printer cartridge
7/27/2010 $649.00 Newtown Office Supply Desk
7/31/2010 $589.00 GAWTHROP GREENWOOD Legal
6/29/2010 $193.93 Fastenal Chain
6/29/2010 $1,019.00 LENNI ELECTRIC CORPORAT Lights
7/12/2010 $328.70 HAMMOND & MCCMLOSY sink
7/15/2010 $154.23 Hach cable
7/16/2010 $347.26 Hach Combo
8/8/2010 $1,599.97 Northern Air Compressor
8/31/2010 $1,310.00 GAWTHROP GREENWOOD LEGAL
8/3/2010 $43.27 Office Depot White board
8/3/2010 $37.08 Office Depot White board
8/31/2010 $2,623.51 PIPE XPRESS INC. pipe
9/1/2010 $465.02 PIPE XPRESS INC. pipe
8/25/2010 $357.50 Main Line Concrete Concrete
Total $106,245.56 $106,245.56
Extras - Capital - Identified capital extras that have not been paid
$20,396.00 Driveway Restoration
$3,300.00 Restoration of parking area
$50,000.00 Paving at RCSTP (we received a credit from Worth)
$6,500.00 Audit
Total $80,196.00 $80,196.00

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls DETAIL

8 of 10

Date Amount Subtotals Name Description
Trailer, Phone, Porta Potty & Internet
12/15/2008$1,039.10ACTON MOBILE INDUSTRIESRENTAL MOBILE OFFICE
12/22/2008$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - THRU 1/19/09
1/21/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 1/20-2/20/09
2/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 2/20- 3/20/09
3/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 3/20 - 4/19
4/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 4/20 - 5/19
5/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFCIE RENTAL 5-20 - 6/19
6/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFCIE RENTAL 6/20 - 7/19
7/10/2009$239.10ACTON MOBILE INDUSTRIES7/20 to 8/19
8/10/2009$239.10ACTON MOBILE INDUSTRIES8/20/ to
9/10/2009$239.10ACTON MOBILE INDUSTRIES
10/10/2009$239.10ACTON MOBILE INDUSTRIESthru 11/19
11/10/2009$239.10ACTON MOBILE INDUSTRIESthru 12/19
12/10/2009$239.10ACTON MOBILE INDUSTRIESThru 1/19
1/10/2010$239.10ACTON MOBILE INDUSTRIESThru 2/19/10
2/10/2010$239.10ACTON MOBILE INDUSTRIESThru 3/19/10
3/10/2010$239.10ACTON MOBILE INDUSTRIESThru 4/19
4/10/2010$239.10ACTON MOBILE INDUSTRIESThru 5/19
5/10/2010$239.10ACTON MOBILE INDUSTRIESThru 6/19
6/10/2010$239.10ACTON MOBILE INDUSTRIESTHRU 7/19
7/10/2010$239.10ACTON MOBILE INDUSTRIESThru 8/19
$5,821.10$5,821.10
12/15/2008$140.00POTTY QUEENRENTAL PORTABLE TOILET - RIDLEY CRK
12/22/2008$64.47POTTY QUEENRENTAL TOILET 12/23-1/10/08
2/8/2009$95.00POTTY QUEENRENTAL TOILET 2/8-3/7
3/8/2009$95.00POTTY QUEENRENTAL TOILET 3/8-4/4
4/5/2009$95.00POTTY QUEENRENTAL TOILET 4/5-5/2
5/5/2009$95.00POTTY QUEENRENTAL TOILET ????
7/26/2009$95.00POTTY QUEENRENTAL 7/26 TO 8/22
8/23/2009$95.00POTTY QUEENRental 8/23 to 9/19
9/20/2009$95.00POTTY QUEENRENTAL 9/20 to 10/17
10/18/2009$95.00POTTY QUEEN10/18/09 to 11/14/09
11/14/2009$95.00POTTY QUEEN11/15 to 12/13
12/13/2009$95.00POTTY QUEEN12/13 to 1/9/10
1/10/2010$95.00POTTY QUEEN1/10/10 to 2/6/10
2/7/2010$95.00POTTY QUEEN2/7/10 to 3/6/10
3/7/2010$95.00POTTY QUEEN3/7 to 4/3
4/4/2010$95.00POTTY QUEEN4/4 to 5/1
5/2/2010$98.80POTTY QUEEN5/2 to 5/29
5/30/2010$96.90POTTY QUEEN5/30 to 6/26
6/30/2010$96.90POTTY QUEEN6/27 to 7/24
7/28/2010$96.90POTTY QUEEN7/25 to 8/21

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls DETAIL

[Handwritten note: 9 of 10]

Date Amount Subtotals Name Description
$1,923.97 $1,923.97
12/22/2008 $174.65 VERIZON -7041 NOVEMBER 25 - DECEMBER 6, 2008
1/7/2009 $137.87 VERIZON -7041 BILLING DATE 1/07/09
2/7/2009 $130.34 VERIZON -7041 BILLING DATE 2/07/09
3/7/2009 $133.97 VERIZON -7041 BILLING DATE 3/7/09
4/7/2009 $136.00 VERIZON -7041 BILLING DATE 4/7/09
5/7/2009 $137.66 VERIZON -7041 BILLING DATE 5/7/09
6/7/2009 $178.47 VERIZON -7041 BILLINGDATE 6/7/2009
7/7/2009 $145.21 VERIZON -7041 Billing Date 7/7/09
8/7/2009 $134.44 VERIZON -7041 Billing Date 8/7/09
9/7/2009 $132.93 VERIZON -7041 billing date 9/7/09
10/7/2009 $133.43 VERIZON -7041 Billing date 10/7/09
11/7/2009 $133.79 VERIZON -7041 Billing Date 11/7/09
12/7/2009 $136.76 VERIZON -7041 Billing date 12/7/09
1/7/2010 $135.11 VERIZON -7041 Billing date 1/7/10
2/7/2010 $134.35 VERIZON -7041 Billing date 2/7/10
3/7/2010 $134.34 VERIZON -7041 Billing date 3/7/10
4/7/2010 $134.72 VERIZON -7041 Billing date 4/7/10
5/7/2010 $136.37 VERIZON -7041 billing ddate 5/7/2010
6/7/2010 $134.06 VERIZON -7041 Billing date 6/7/10
7/7/2010 $134.18 VERIZON -7041 Billing date 7/7/10
$2,788.65 $2,788.65
8/31/2009 $286.56 VERIZON INTERNET (FIRST BILL)
9/28/2009 $69.99 VERIZON INTERNET
10/28/2009 $69.99 VERIZON INTERNET
11/28/2009 $69.99 VERIZON INTERNET
12/28/2009 $69.99 VERIZON INTERNET
1/28/2010 $69.99 VERIZON INTERNET
2/28/2010 $69.99 VERIZON INTERNET
3/28/2010 $69.99 VERIZON INTERNET
4/28/2010 $69.99 VERIZON INTERNET
5/28/2010 $69.99 VERIZON INTERNET
6/28/2010 $69.99 VERIZON INTERNET
$986.46 $986.46
Trailer, Phone, Porta Potty & Internet Total $11,520.18

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls DETAIL

[Handwritten note: 10 of 10]

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
PROJECTED FINAL COSTS

October 6, 2010

Name Budget or Contract amt. Paid to Date Projected Final Cost
EXPENSES
Borrowing costs $52,250.00 $52,250.00 $52,250.00
Worth $7,865,400.00 $7,366,815.62 $7,865,400.00
    change orders -$1,400.64 $0.00 $21,357.00
Clinger $974,000.00 $950,777.64 $974,000.00
    change orders $33,312.24 $0.00 $33,312.24
Pennoni (Inspection) (05) $136,200.00 $136,197.62 $136,197.62
Pennoni (Continued Services) (10) $177,900.00 $158,702.61 $177,900.00
Pennoni (Rechargeable) (06) $20,000.00 $12,961.75 $12,961.75
Brickhouse $175,000.00 $154,802.50 $155,000.00
Extras
Capital $459,337.40 $106,245.56 $116,409.18
Capital (Identified but not paid) $80,196.00 $0.00 $73,696.00
Trailer, Phone, Porta Pot & Internet $12,000.00 $11,520.18 $13,500.00
EXPENSES TOTAL $9,984,195.00 $8,950,273.48 $9,631,983.79

Worth Change Orders - assumes we will spend $11,357 for the UV Channel and $10,000 for unknown change orders
Extras Capital - assumes $10,000 for unknown extras

Original Budget $9,500,000.00
Projected final cost $9,631,983.79
Over(Under) $131,983.79
Percentage 1.39%

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 100610.xls Projections

GRAINGER
580 E LANCASTER AVE
FRAZER, PA 19355-1808

PAGE 1 OF 1

ORIGINAL INVOICE

GRAINGER ACCOUNT NUMBER 829095066
INVOICE NUMBER 9355202699
INVOICE DATE 09/23/2010
DUE DATE 10/23/2010
AMOUNT DUE 212.40

SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107

PO NUMBER: RIDLEY CREEK
PROJECT/JOB: 610 656 2742
CALLER: MARK MILLER
CUSTOMER PHONE: (610) 692-7171
ORDER/DELIVERY#: 6143126309
INCO TERMS: FOB ORIGIN

BILL TO
MDG2010 00008494 1 AT 0357
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
008494

APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: [Handwritten: 07424.7454]

THANK YOU!
FEI NUMBER 36-1150280

FOR ANY QUESTIONS ABOUT THIS INVOICE OR ACCOUNT CALL 610-727-5251

LINE # ITEM # DESCRIPTION QUANTITY BACK ORDERED UNIT PRICE TOTAL
1 3TB21 DOOR,SMOOTH STRIP,W6FT
MANUFACTURER # 999-00020
1 212.40 212.40

[Handwritten notes: RC / ok / tes / 9/29/10]

NUMBER OF PKGS: 0 WEIGHT: 45.00
DATE SHIPPED: 09/23/2010

INVOICE SUB TOTAL: 212.40

These items are sold for domestic consumption in the United States. If exported, purchaser assumes full responsibility for compliance with US export controls.

PAYMENT TERMS NET 30 DAYS. PAY THIS INVOICE NO STATEMENT SENT. PAYABLE IN U.S. DOLLARS.
AMOUNT DUE 212.40

PLEASE DETACH THIS PORTION AND RETURN WITH YOUR PAYMENT.

BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107

REMIT TO:
GRAINGER
DEPT. 829095066
PALATINE, IL 60038-0001

82909506693552026991000021240100000001000000010000001010232d

ACCOUNT NUMBER 829095066
DATE 09/23/2010
INVOICE NUMBER 9355202699
AMOUNT DUE 212.40

FOR COMMENTS OR CHANGE OF ADDRESS, ENTER INFORMATION ON REVERSE SIDE.

INVOICE

YALE ELECTRIC SUPPLY COMPANY
706 E. Market Street
West Chester, PA 19380
610-719-2700

REMIT TO:
YALE ELECTRIC SUPPLY
P.O. BOX 647
LEBANON, PA, 17042-0647

APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: [Handwritten: 07424-7453]

09/20/10 06:17:44 PM
INVOICE NUMBER: 7223322-01

EASTGO

BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

[Handwritten: ok tes 9/27]

CUSTOMER P.O. NO. RIDLEY CREEK STATI

INVOICE NUMBER SLSMN ORDER DATE TAKER CUSTOMER P.O. NUMBER DATE
7223322-01 799 09/20/10 761 RIDLEY CREEK STATI 09/20/10

INSTRUCTIONS: | FRT: B | PAGE NO: 1

ORDERED B.O./RET. SHIPPED DISP. ITEM CODE AND DESCRIPTION U/M UNIT PRICE AMOUNT
1 1 SQD QOB230
MINIATURE CIRCUIT BREAKER 1
EA 27.2980 27.30
20 20 RIG 1/2
1/2 GALV STEEL
C 116.5361 23.31
2 2 PST PS1300 1/2 EG
PIPE CLAMP
C 54.9023 1.10
1 1 CUT DG221UGB
30A/2P GD Non-Fusible Safet
EA 28.6463 28.65
1 1 NEER AC-90
3/8IN 90D FLEX CONN
C 65.2334 0.65
1 1 NEER RN-50
1/2IN OFFSET NIPPLE
C 209.3960 2.09
2 2 NEER L-100
1/2IN LOCKNUT
C 6.1723 0.12
1 1 STC 52171-1/2-3/4-E
4"SQUARE BX, STL, 30.3CU, 1/2&
C 82.1177 0.82
1 1 STC 52C1
4"SQ BX COVER, STL, FLAT&BLAN
C 23.2710 0.23
2 2 STC HC401
1/2" CONN, COMP., RGD/IMC, STL
C 180.1790 3.60
3 3 VICTOR 10713-S
1/2 1H CONDUIT STRAP
C 15.0801 0.45

*** THIS IS YOUR INVOICE ***

SUB TOTAL 88.32
MISC. CHARGE
TELE. CHARGE
FREIGHT TOTAL
FED./OTHER TAX
STATE TAX
PAYMENT REC'D. 0.00
TOTAL AMT DUE 88.32

NET TERMS: PROX 25
DUE: 10/25/10
*** ORDER COMPLETED ***

CODE EXPLANATION: * - STATE TAX APPLICABLE; # - FED./OTHER TAX APPLICABLE; + - STATE & FEDERAL TAX; B - BALANCE BACK ORDERED; C - CONSIDER COMPLETE; D - DIRECT SHIPMENT; F - FACTORY MINIMUM; R - RETURNED CYL.

MATERIAL CANNOT BE RETURNED WITHOUT AUTHORIZATION AND WILL BE SUBJECT TO A RESTOCKING CHARGE.
PAST DUE INVOICES SUBJECT TO 1.5% SERVICE CHARGE.

XLOPTB 8/88

09/21/10 08:40 PM EDT via VSI-FAX Page 15 of 18 #330666

INVOICE

YALE ELECTRIC SUPPLY COMPANY
706 E. Market Street
West Chester, PA 19380
610-719-9253

REMIT TO:
YALE ELECTRIC SUPPLY
P.O. BOX 647
LEBANON, PA, 17042-0647

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: [Handwritten: 07424-7453]

09/21/10 07:13:04 PM
INVOICE NUMBER: 7223479-01

EASTGO

BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

[Handwritten: ok tes 9/27]

CUSTOMER P.O. NO. LAB

INVOICE NUMBER SLSMN ORDER DATE TAKER CUSTOMER P.O. NUMBER DATE
7223479-01 799 09/21/10 760 LAB 09/21/10

INSTRUCTIONS: | FRT: B | PAGE NO: 1

ORDERED B.O./RET. SHIPPED DISP. ITEM CODE AND DESCRIPTION U/M UNIT PRICE AMOUNT
1 1 QMRK QMK-2544W
208/240V BB HEATER
E 32.1433 32.14
1 1 QMRK QMK-TA-2AW
22A 2P THERM SECT
E 17.2584 17.26
1 1 RDT 2IH5-1
RAINTIGHT DEV BOX 2 GANG, 5
C 554.2880 5.54
1 1 RDT 2IH5-2
RAINTIGHT DEV BOX 2 GANG, 5
C 620.8975 6.21
2 2 PNS 2095-I
20A GFCI RCPT
EA 10.1003 20.20
1 1 PNS CR20-I
20A 125V 5-20R DPLX RCPT
EA 1.3383 1.34
2 2 RDT IH3-1
1/2" D-T DEVICE BOX 3 HOLE
C 233.0850 4.66
20 20 EMT 1/2
1/2 EMT
C 16.9301 3.39
6 6 B-LINE BL1400
1/2" RIGID OR EMT HANGER
C 1.9931 1.20
6 6 NEER TC-601
1/2IN DC COMPRESSION CONN
C 22.8386 1.37
2 2 MULB 97402
2G SAT-SS GFI RCPT PLT
C 236.8520 4.74
2 2 PNS 26342-I
20A 125V 5-20R DPLX RCP
EA 5.9843 11.97
1 1 RDT DPLG-1
1/2" SLVR CLOSURE PLG
C 92.6801 0.93
PAYMENT REC'D. CONTINUED

[Handwritten: 1 of 2]

XLOPTB 8/88

Page 16 of 18 #330666

INVOICE

YALE ELECTRIC SUPPLY COMPANY
706 E. Market Street
West Chester, PA 19380
610-719-9253

REMIT TO:
YALE ELECTRIC SUPPLY
P.O. BOX 647
LEBANON, PA, 17042-0647

09/21/10 07:13:04 PM
INVOICE NUMBER: 7223479-01

EASTGO

BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

CUSTOMER P.O. NO. LAB

INVOICE NUMBER SLSMN ORDER DATE TAKER CUSTOMER P.O. NUMBER DATE
7223479-01 799 09/21/10 760 LAB 09/21/10

INSTRUCTIONS: | FRT: B | PAGE NO: 2

ORDERED B.O./RET. SHIPPED DISP. ITEM CODE AND DESCRIPTION U/M UNIT PRICE AMOUNT
1 1 RDT DPLG-2
3/4" SLV CLOSURE PLG 10 PER
C 210.3578 2.10
1 1 RDT CCB
DRY-TITE BLANK CVR DEVICE M
C 53.0376 0.53
1 1 MULB 97101
1G SAT-SS DPLX RCPT PLT
C 118.4332 1.18

*** THIS IS YOUR INVOICE ***

SUB TOTAL 114.76
MISC. CHARGE
TELE. CHARGE
FREIGHT TOTAL
FED./OTHER TAX
STATE TAX
PAYMENT REC'D. 0.00
TOTAL AMT DUE 114.76

NET TERMS: PROX 25
DUE: 10/25/10
*** ORDER COMPLETED ***

CODE EXPLANATION: * - STATE TAX APPLICABLE; # - FED./OTHER TAX APPLICABLE; + - STATE & FEDERAL TAX; B - BALANCE BACK ORDERED; C - CONSIDER COMPLETE; D - DIRECT SHIPMENT; F - FACTORY MINIMUM; R - RETURNED CYL.

MATERIAL CANNOT BE RETURNED WITHOUT AUTHORIZATION AND WILL BE SUBJECT TO A RESTOCKING CHARGE.
PAST DUE INVOICES SUBJECT TO 1.5% SERVICE CHARGE.

[Handwritten: 2 of 2]

XLOPTB 8/88

Page: 1

INVOICE

Acton Mobile Industries
8007 A Corporate Drive
Baltimore, MD 21236
(410) 931-9100

Invoice Number PRI0664618
Invoice Date 09/20/10
Due Date 09/30/10
Delivery Date 11/20/08
P.O. Number
Sales Person Richard Resnicoff
Project Location Sewage Treatment
Contract No C0000063218 QUO-59288-LG9JH9

[Handwritten: R.C.]

Bill To:
East Goshen Township
Mark Miller
1580 Paoli Pike
WEST CHESTER, PA 19380

Ship To:
Sewage Treatment
Mark Miller
1751 Town Drive
WEST CHESTER, PA 19380

Customer ID E00032 | Serial No. AMI-24152

Description Taxable Quantity Unit Price Total Price
Knockdown No 1 140.00 140.00
Return Freight No 1 165.00 165.00

APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: [Handwritten: 07424-7455]

Amount Subject to Sales Tax 0.00 Subtotal: 305.00
Amount Exempt from Sales Tax 305.00 Total Sales Tax: 0.00
Invoice Total: 305.00
Payments/Credits: 0.00
Total Due: 305.00

Final Charges will be billed at the current rate at the time of lease termination including a possible fuel surcharge due to rising fuel cost.

PLEASE RETURN THIS PORTION WITH REMITTANCE

C0000063218

Customer ID: E00032 4
Invoice No.: PRI0664618 8
Total: 305.00
Amount Paid $_______

Remit To:
Acton Mobile Industries
P.O. Box 758689
Baltimore, MD 21275-8689

For billing inquiries or change of address please contact 1-866-931-9319

[ ] To pay by credit card for this invoice only
[ ] To pay by credit card for all future invoices

please check one: [ ] Visa [ ] M/C [ ] AMEX [ ] Discover

Name: ______________________
Signature: ______________________
CC No: ______________________
CC Billing Zip Code: _________ Exp Date: __ / __

E00032 4 PRI0664618 8 0000030500 8

[Handwritten: ok TS 9/27]

STEVEN L BAHNATKA
447 HARTFORD SQUARE
WEST CHESTER, PA 19380
PHONE: 610.506.3917

INVOICE

9/17/10

BILL TO:
EAST GOSHEN TWP.
1580 PAOLI PIKE
WEST CHESTER, PA 19380
PHONE: 610.692.7171

SHIP TO:

APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO:

JOB NAME SALES REP. DATE ORDERED DATE DELIVERED SHIPPING P.O. NO.
MISC SIGNS STEVE 9/17/10 DELIVER
QUANTITY DESCRIPTION PRICE
1 26X60 ACRYLIC PARK SIGN FOR CONSERVANCY BOARD $95.00
1 12x30 WOOD SIGN "EAST GOSHEN TOT LOT..." FOR PARK $65.00
1 26X10.5 ALUMINUM CAST PLAQUE "RIDLEY TREATMENT PLANT" $450.00
30 EAST GOSHEN TOWNSHIP 3" $65.00
1 WOOD CHIPPER DECALS; INS $35.00

[Handwritten notes: arrow pointing to Ridley Treatment Plant: "Ridley Creek Expansion", codes: "01461-2480", "01454-3720", "07424-7450", "101437 2460"]

SUBTOTAL $710.00
SALES TAX EXEMPT
SHIPPING 0
TOTAL DUE $710.00

PLEASE MAKE ALL CHECKS PAYABLE TO: STEVEN L BAHNATKA
IF YOU HAVE ANY QUESTIONS CONCERNING THIS INVOICE, PLEASE CALL: STEVE, 610.506.3917

[Handwritten: ok TS 9/2]

THANK YOU FOR YOUR BUSINESS!

M & S SERVICE COMPANY INC
P. O. BOX 893
1220 VALLEY FORGE RD #16
VALLEY FORGE, PA 19482
PHONE: 610-933-5501
FAX: 610-933-5423

* INVOICE *

Invoice Number: 7522-0
Invoice Date: 09/07/10
Page: 1

APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: [Handwritten: 05472-242 crossed out, replaced with 07424-7454]

Sold To:
EAST GOSHEN
1580 PAOLI PIKE
WEST CHESTER, PA 19380

Ship To:
EAST GOSHEN
1580 PAOLI PIKE
WEST CHESTER, PA 19380

Ship Via.: JOHN LAIDLEY
Ship Date: 08/23/10
Due Date.: 10/07/10
Terms....: NET 30

Cust I.D......: EGOSHE
P.O. Number..: MARK MILLER
P.O. Date....: 08/23/10
Job/Order No.: 7522-0
Salesperson..: JOHN L

Item I.D./Desc. Ordered Shipped Unit Price Net TX
RIDLEY CREEK STP
RACO
ALARM SYSTEM QUOTE - RACO VERBATIM 16 CHANNEL DIALER
1.00 1.00 EA 4190.0000 4190.00 E

SUPPLY AND INSTALL 16 CHANNEL ALARM DIALER FOR ALARMS REQUIRED IN BLOWER BUILDING

[Handwritten: ok RS 9/20]
[Handwritten: Ridley Creek Expansion]

Subtotal: 4190.00
Tax.....: 0.00
Payments: 0.00
Total...: 4190.00

Invoice

HAMMOND & MC CLOSKEY, INC.
PLUMBING & HEATING
1 CANNON HILL DRIVE
WEST CHESTER, PA 19382

Phone #: 610-793-0411

Date Invoice #
9/10/2010 4721
Billing Address: Job Address:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Ridley Creek Sewer Treatment Plant
West Chester, PA 19380

APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: [Handwritten: 07424-7452]

Telephone #: P.O. No. Terms:
610-692-7171 Due on receipt
Description Amount

9/10/10 - Disconnected and removed existing water heater. Piped in new water heater furnished by customer in new location and made necessary alterations to water lines.
Ran water line and installed hose faucet in new press room.

1 - 3/4" copper split ring hanger complete
6 - 1" galvanized split ring hangers complete
5' - 3/4" type "L" copper tubing
10' - 1/2" type "L" copper tubing
14 - 1/2" copper fittings
1 - 1/2" CxC ball valve
4 - 3/4" specialty copper fittings
1 - 3/4" transition coupling
6 - 1" PVC S/40 fittings
20' - 1" PVC S/40 pipe
1 - 1" PVC S/40 ball valve
1 - 3/4" hose faucet brass
1 - 3/4" CPVC "M" adapter
1' - 3/4" CPVC pipe
misc. shop supplies (solder, flux, sealant, etc.)
5.5 HRS. @ $100 HR.




10.04
60.24
27.90
34.40
41.29
11.95
39.02
11.31
7.78
22.20
11.95
13.14
1.90
1.10
7.00
550.00

[Handwritten: Ridley Creek Expansion]

Total $851.22

Thank you! We appreciate the opportunity to serve you and the confidence you have placed in us.

TERMS: NET DUE UPON RECEIPT; $25 charge for checks returned NSF; $20 charge to transfer accounts to Transworld Systems for collection.

MAIN LINE CONCRETE & SUPPLY INC.

1001 BOOT ROAD
DOWNINGTOWN, PA 19335
PHONE: 610 269 5556
FAX: 610 269 5476

LOAD # 1 Order Taker : SUE | ACCT.# EAS30 | INV.# 265121

EAST GOSHEN TOWNSHIP
1751 TOWNE DRIVE
EAST GOSHEN

DATE 08/25/10
(610) 692-7171
(610) 656-8743

MIX: MIX 3000PSI

QUANTITY STRENGTH SLUMP AIR ACCELERATOR
2.50 YDS.3000 PSI.4 IN.6% +/- 2 %0 %
START TIME EST. UNLOADING TIME NO. OF GALLONS ADDED WATER ADDED ON JOB - AS REQUESTED BY CUSTOMER (PLEASE INITIAL)
00
Truck # 2331Time OutOn Job 1050Pour-11:10 Off Job | Time In
QUANTITY PRODUCT CODE MATERIAL UNIT PRICE AMOUNT
2.50 YDCONC 3000 PSICONCRETE 3000 PSI MIX 3000PSI83.00207.50
1 EACF1XERZONE1DELIVERY ZONE 1150.00150.00

**** Instructions / Directions ****
TRENCH
**** Location Directions ****
BOOT
92
352 S
E BOOT
R-THORNCROFT
L-TOWNE
WATER TREATMENT PLANT

ok RS 9/20

Ridley Creek Expansion

APPROVED BY: MB
DATE PAID:
CHECK #:
CHARGED TO: Electric trench. 07424-7453

CASH [ ] CHECK [ ] IN-HOUSE CHARGE [ ] VISA [ ] M/C [ ] AMEX [ ]

SUB TOTAL SALES TAX TOTAL AMOUNT AMOUNT PAID
357.500.00357.50

MAIN LINE CONCRETE & SUPPLY INC. ASSUMES NO RESPONSIBILITY FOR SLUMP, STRENGTH OR QUALITY OF CONCRETE AFTER WATER IS ADDED AT THE JOB SITE. ALL DELIVERIES ARE SUBJECT TO THE GENERAL TERMS AND CONDITIONS ON THE REVERSE SIDE. BY SIGNING BELOW, THE PURCHASER AND ALL AGENTS, SERVANTS, AND EMPLOYEES THEREOF, AGREE TO THE GENERAL TERMS AND CONDITIONS ON THE REVERSE SIDE AND THAT THE GOODS WERE RECEIVED IN GOOD CONDITION AND THE SERVICES WERE RENDERED IN A GOOD AND WORKMANLIKE MANNER.

RECEIVED BY: [signature] (SIGNATURE) (PRINT NAME) (DATE)

CAUTION - CONCRETE CAUSES SKIN IRRITATION AND IS INJURIOUS TO EYES

Invoice

Pipe Xpress, Inc.
PO BOX 5088
West Chester, PA 19380-9998
610-918-7120
FAX 610-918-1328

Date Invoice #
9/1/2010 48065
Bill To Ship To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
RIDLEY CREEK
P.O. No. Terms Due Date Rep Ship Date Ship Via Ordered
VERBAL 2% 10 Net 30 10/1/2010 9/1/2010 PICK UP GEORGE THOMPSON
Item Description Order... Invoiced Rate Ship Date Backordered Amount
401-80 8 PVC S40 TEE SXSXS 2 2 103.88 0 207.76
437-585 8 X 6 PVC S40 BUSHING SXS 2 2 46.98 0 93.96
156-88 8 FLEX COUPLING CIXPVC 4 4 23.19 0 92.76
801-60 6 PVC S80 TEE SXSXS 1 1 70.54 0 70.54

R.C

Thank you for your business.

Subtotal $465.02
Sales Tax () $0.00
Total $465.02

Sales Order

Pipe Xpress, Inc.
PO BOX 5088
West Chester, PA 19380-9998
610-918-7120
FAX 610-918-1328

Date S.O. No.
9/1/2010 48065
Name / Address Ship To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
RIDLEY CREEK
P.O. No. Terms Rep Ship Via Ordered
VERBAL 2% 10 Net 30 PICK UP GEORGE THOMPS...
Item Description Ordered
401-80 8 PVC S40 TEE SXSXS 2
437-585 8 X 6 PVC S40 BUSHING SXS 2
156-88 8 FLEX COUPLING CIXPVC 4
801-60 6 PVC S80 TEE SXSXS 1

Bart

RC Exp

APPROVED BY: [initials]
DATE PAID: ________
CHECK #: ________
CHARGED TO: ________

Thank you for your business.

Signature ____________________________________

Invoice

Pipe Xpress, Inc.
PO BOX 5088
West Chester, PA 19380-9998
610-918-7120
FAX 610-918-1328

RC

Date Invoice #
9/7/2010 48102
BILL TO SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SAME
APPROVED BY: [initials]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 1-420-????
07424-7455
Water Supply
P.O. No. Terms Due Date Rep Ship Date Ship Via Ordered
VERBAL 2% 10 Net 30 10/7/2010 9/3/2010 OUR TRUCK DUSTY
Item Description Ordered Invoiced Rate Ship Date Backordered Amount
P810 1 X 20' PVC S80 PIPE PE 80 80 0.76 0 60.80
801-10 1 PVC S80 TEE SXSXS 3 3 3.82 0 11.46
806-10 1 PVC S80 90 ELL SXS 3 3 2.13 0 6.39
847-10 1 PVC S80 CAP SOC 1 1 3.43 0 3.43
836-10 1 PVC S80 MALE ADAPTER SXMIPT 1 1 4.17 0 4.17

Thank you for your business.

OK TRS 9/20

Subtotal $86.25
Sales Tax () $0.00
Total $86.25

Ridley Creek Exp.
Expense

CHECK REQUEST FORM

Approved:
Date Paid:
Check #
Charged to: debit 07424.7454

credit 07105.1000

Date Form submitted: 9/14/10

Date & Time Check Needed: ____________________

Pay to the Order of: East Goshen (425)

Mailing Address:
____________________
____________________
____________________

Amount of Check: $388.60

Special Instructions:
(Check One)

  • [ ] Mail Check REGULAR MAIL
  • [ ] Mail Check: EXPRESS MAIL
  • [x] Return Check to Requester
  • [ ] Hold Check until: ____________________

Explanation of Expenses: Reimburse General Fund PLGIT for RC Exp Purchase - Credit Card Paint (8/3)

Request Submitted by: BP

OK TRS 9/20

J/E - Deposit to Gen Fund
Receipt of check debit 1100.1010
Credit 1401.3000

THE HOME DEPOT
More saving. More doing.

690 LANCASTER PIKE, FRAZER, PA 19355
SM LARRY MULLIGAN 610-722-0707

4119 00002 87383 09/09/10 01:30 PM
CASHIER BRYAN - BFL4R3

008314000013 2X4-8 #2 PT <A>
7@1.97
13.79
008314002512 5/4X6-8 STD <A>
7@3.97
27.79
008314005018 15/32 PT CDX <A>
2@28.97
57.94
077027045031 GUTTR&FLASH <A>
2@5.97
11.94
092097241206 TAPCON 1/4 <A> 4.43
764666564268 GRN.1# SCREW <A> 8.69
764666564350 1LB 2-1/2IN <A> 8.69
SUBTOTAL 133.27
SALES TAX 0.00
TOTAL $133.27
XXXXXXXXXXXX8539 HOME DEPOT 133.27
AUTH CODE 009906/8020508 TA

TAX EXEMPT

EAST GOSHEN TWP
LINDER CHARLES

[Barcode: 4119 02 87383 09/09/2010 7015]

RETURN POLICY DEFINITIONS

POLICY ID DAYS POLICY EXPIRES ON
A 1 90 12/08/2010

THE HOME DEPOT RESERVES THE RIGHT TO LIMIT / DENY RETURNS. PLEASE SEE THE RETURN POLICY SIGN IN STORES FOR DETAILS.

GUARANTEED LOW PRICES
[illegible]

RC

APPROVED BY: [initials]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 017424-7454

ok TRS 9/23

Lowe's® Business Card Account

EAST GOSHEN TOWNSHIP
Account Number 821 3139 027963 1

Visit us at www.lowes.com/credit
Customer Service: 1-800-444-1408

Summary of Account Activity
Previous Balance $563.86
- Payments $563.59
- Other Credits $0.00
+ Purchases/Debits $1,192.97
+ Fees Charged $0.00
+ Interest Charged $0.00
New Balance $1,193.24
Credit Limit $15,500.00
Available Credit $14,306.00
Statement Closing Date 09/17/2010
Days in Billing Cycle 31
Payment Information
New Balance $1,193.24
Total Minimum Payment Due $50.00
Payment Due Date 10/13/2010
Transaction Summary
Tran Date Post Date Reference Number/
Invoice Number
Description of Transaction or Credit Amount
08/18 08/18 87022 STORE 1729 DOWINGTON PA $768.44
09/02 09/02 02200 STORE 1729 DOWINGTON PA $344.98
09/02 09/02 02201 STORE 1729 DOWINGTON PA $79.55
09/10 09/10 PAYMENT - THANK YOU DOWINGTOWN PA ($27.96)
09/10 09/10 PAYMENT - THANK YOU DOWINGTOWN PA ($471.61)
09/10 09/10 PAYMENT - THANK YOU DOWINGTOWN PA ($64.02)

Gen Acct. [for $768.44]

RC Acct. [for $344.98 and $79.55]

Interest Charge Calculation
Expiration Date Average Daily Balance Daily Periodic Rate Corresponding ANNUAL PERCENTAGE RATE INTEREST CHARGE Balance Method
Regular Purchases NA $0.00 0.05754% 21.00% $0.00 2D

ANNUAL PERCENTAGE RATE purchases .............. 21.00% TOTAL INTEREST CHARGE: $0.00

ok TRS

CUSTOMER SERVICE: For Account Information log on to www.lowes.com/credit. This account is not registered. The authentication code is: ESHW436, or call toll-free 1-800-444-1408.
PAYMENT DUE BY 5 P.M. (ET) ON THE DUE DATE.
NOTICE: We may convert your payment into an electronic debit. See reverse for details, Billing Rights Information and other important information.

7009 0007 YWG 1 7 17 100917 PAGE 1 of 5 9296 0011 B508 01CL7009 385651

Detach and mail this portion with your check. Do not include any correspondence with your check.

LOWE'S Commercial SERVICES

Account Number: 821 3139 027963 1

Total Minimum Payment Due Payment Due Date New Balance
$50.00 10/13/2010 $1,193.24

Payment Enclosed: $ [   ] [   ] [   ] [   ] . [   ] [   ]
Please use blue or black ink.

New address or email? Print changes on back.

EAST GOSHEN TOWNSHIP
A/P
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

Make Payment to: LOWE'S BUSINESS ACCT/GEMB
P.O. BOX 530970
ATLANTA, GA 30353-0970

00050000006402 000500000119324 000798213 1390279 63122

LOWE'S®

LOWE'S HOME CENTERS, INC.
1250 CORNERSTONE BOULEVARD
DOWNINGTOWN, PA 19335 (610) 343-7000

- SALE -
SALES #: S1729NT1 982232 09-02-10

Item Amount
270871 MC (322389) BRSCRFT ELEC33.98
121802 50G 6YR ELEC SHORT WTR HT311.00
SUBTOTAL:344.98
TAX:0.00
INVOICE 02200 TOTAL:344.98
LCC:344.98

LCC:#9631 AMOUNT:344.98 AUTHCD:001552
REFID:804007341 09/02/10 14:27:43
LBA/PO: REDLEY CRE

STORE: 1729 TERMINAL: 02 09/02/10 14:28:16
# OF ITEMS PURCHASED: 2
EXCLUDES FEES, SERVICES AND SPECIAL ORDER ITEMS

THANK YOU FOR SHOPPING LOWE'S.
SEE REVERSE SIDE FOR RETURN POLICY.
STORE MANAGER: JAY SMITHSON

HAVE A COMMENT OR FEEDBACK? LET US KNOW AT:
WWW.LOWES.COM/FEEDBACK
STORE CODE: 17290-90210-02200

Barb
Ridley Creek Exp

APPROVED BY: MB
DATE PAID:
CHECK #:
CHARGED TO: 07424.7454

0002 0005

EAST GOSHEN TOWNSHIP 341942
ACCOUNT #: 7982131390279631 LOWE'S BUSINESS ACCOUNT P.O. #: QPR PATCH
INVOICE #: 87022 DATE OF SALE: 100818 STORE #: 1729
TRANSACTION #: 0 AUTHORIZATION: 001961 REGISTER #:

S.K.U DESCRIPTION QUANTITY UNIT PRICE EXT. PRICE
000000000218577 50# PERMANENT & EZ POTHOL 63.000 EA $11.88 $748.44
000000000000002 DELIVERY FEE 1.000 EA $20.00 $20.00
SUB $768.44 TAX $0.00 TOTAL INVOICE $768.44
CREDITS TOTAL $0.00
BALANCE DUE $768.44

EAST GOSHEN TOWNSHIP 341942
ACCOUNT #: 7982131390279631 LOWE'S BUSINESS ACCOUNT P.O. #: REDLEY CRE
INVOICE #: 02200 DATE OF SALE: 100902 STORE #: 1729
TRANSACTION #: 0 AUTHORIZATION: 001552 REGISTER #:

S.K.U DESCRIPTION QUANTITY UNIT PRICE EXT. PRICE
000000000121802 50G 6YR ELEC SHORT WTR HT 1.000 EA $311.00 $311.00
000000000270871 MC (322389) BRSCRFT ELEC 1.000 EA $33.98 $33.98
SUB $344.98 TAX $0.00 TOTAL INVOICE $344.98
CREDITS TOTAL $0.00
BALANCE DUE $344.98

Ridley Creek [referring to Balance Due $344.98]

EAST GOSHEN TOWNSHIP 341942
ACCOUNT #: 7982131390279631 LOWE'S BUSINESS ACCOUNT P.O. #: /
INVOICE #: 02201 DATE OF SALE: 100902 STORE #: 1729
TRANSACTION #: 0 AUTHORIZATION: 001287 REGISTER #:

S.K.U DESCRIPTION QUANTITY UNIT PRICE EXT. PRICE
000000000201676 5/4X6X8 SW TOP CHOICE ACQ 7.000 EA $7.97 $55.79
000000000046905 2X4X8 ACQ TOP CHOICE TREA 8.000 EA $2.97 $23.76
SUB $79.55 TAX $0.00 TOTAL INVOICE $79.55
CREDITS TOTAL $0.00
BALANCE DUE $79.55

Ridley Creek [referring to Balance Due $79.55]

OK TRS

LOWE'S®

LOWE'S HOME CENTERS, INC.
1250 CORNERSTONE BOULEVARD
DOWNINGTOWN, PA 19335 (610) 343-7000

- SALE -
SALES #: S1729NT1 982232 09-02-10

Item Amount
201676 5/4X6X8 SW TOP CHOICE ACQ
7 @ 7.97
55.79
46905 2X4X8 ACQ TOP CHOICE TREA
8 @ 2.97
23.76
SUBTOTAL:79.55
TAX:0.00
INVOICE 02201 TOTAL:79.55
LCC:79.55

LCC:#9631 AMOUNT:79.55 AUTHCD:001287
REFID:804007341 09/02/10 14:33:18
LBA/PO: /

STORE: 1729 TERMINAL: 02 09/02/10 14:33:34
# OF ITEMS PURCHASED: 15
EXCLUDES FEES, SERVICES AND SPECIAL ORDER ITEMS

THANK YOU FOR SHOPPING LOWE'S.
SEE REVERSE SIDE FOR RETURN POLICY.
STORE MANAGER: JAY SMITHSON

HAVE A COMMENT OR FEEDBACK? LET US KNOW AT:
WWW.LOWES.COM/FEEDBACK
STORE CODE: 17290-90210-02201

WE HAVE THE LOWEST PRICES, GUARANTEED!
IF YOU FIND A LOWER PRICE, WE WILL BEAT IT BY 10%.
SEE STORE FOR DETAILS.

APPROVED BY: MB
DATE PAID:
CHECK #:
CHARGED TO: 07424.7454

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 452026
Invoice Date : 09/29/2010
Project : EGMA0707
Project Name : RCSTP Expansion

For Services Rendered through: 09/19/2010

Construction and coordination meetings with contractors and Township; construction management; O&M submittal and schedule review; punchlist development; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has included working with Operator regarding WWTP treatment performance; responses to Contractor RFIs; schedule reviews, and continued construction observation. Architect review of shop drawings.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 - Permit Design est. $111,400.00 $111,385.00 $111,385.00 $0.00
02 - Permitting est. $14,200.00 $14,184.00 $14,184.00 $0.00
03 - Final Design est. $226,700.00 $226,655.50 $226,655.50 $0.00
04 - Bidding est. $14,500.00 $14,446.50 $14,446.50 $0.00
05 - Construction est. $136,200.00 $136,197.62 $136,197.62 $0.00
06 - Additional Submittals est. $20,000.00 $19,997.18 $19,997.18 $0.00
10 - Continued Construction Services est. $173,600.00 $158,702.61 $171,224.42 $12,521.81
Total : $696,600.00 $681,568.41 $694,090.22 $12,521.81

Engineering Servs-direct: McGuffin Associates Architects 500.00

Amount Due This Invoice $12,521.81

OK TRS 10-6

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls
Invoice Date 09-29-2010

Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 452026
Invoice Period: 8/16/2010 to 9/19/2010
Initial Authorization: $ 465,000.00 Date: 8/14/2007
Changes: $ - Date: 2/5/2009
Changes: $ 58,000.00 Date: 5/11/2009
Changes: $ 99,700.00 Date: 1/11/2010
Changes: $ 22,000.00 Date: 5/10/2010
Changes: $ 11,500.00 Date: 6/14/2010
Changes: $ 40,400.00 Date: 8/5/2010
Contract Amount: $ 696,600.00
Previously Invoiced: $ 681,568.41
Current Invoice: $ 12,521.81
Invoiced to Date ($): $ 694,090.22
Invoiced to Date (%): 100%
Remaining Budget ($): $ 2,509.78
Remaining Budget (%): 0.36%

Budget by Phase:

Phase No. 10
Phase Name: Continued Eng Svcs
Phase Budget: $ 99,700.00
Changes: $ 33,500.00
Changes: $ 40,400.00
Contract Amount: $ 173,600.00
Previously Invoiced: $ 158,702.61
Current Invoice: $ 12,521.81
Invoiced to Date ($): $ 171,224.42
Invoiced to Date (%): 99%
Remaining Budget ($): $ 2,375.58
Remaining Budget (%): 2%

Comments: Phase 10 - Continued Engineering Services
Construction and coordination meetings with contractors and Township; construction management; O&M submittal and schedule review; punchlist development; site observation of construction and consultation with Township regarding same. Additional effort this invoice period has included working with Operator regarding WWTP treatment performance; responses to Contractor RFIs; schedule reviews, and continued construction observation. Architect review of shop drawings.

Effort by Labor Category under Phase 10:

Category Previous Hrs. Current Total Hrs.
Authority Engineer 156.25 29.50 185.75
Senior Engineer 341.75 31.50 373.25
Senior Designer 162.00 7.00 169.00
Project Engineer 146.50 4.50 151.00
Staff Engineer 12.25 0.00 12.25
Associate Engineer 59.00 10.00 69.00
Graduate Engineer 43.75 0.00 43.75
Project Representative/Inspector 2.50 0.00 2.50
Technical Specialist (McAloon) 922.25 41.50 963.75
Engineering Technician I 38.00 11.00 49.00
Administrative Assistant I 0.50 0.00 0.50
Totals 1884.75 135.00 2019.75

Brickhouse Environmental
Consultants and Engineers

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Invoice number: 5559-A
Date: 10/1/2010
Client ID: 548

Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-1 E. Goshen/Ridley Creek Sewer Plant/Clinger

Attn: Mr. Rick Smith, Township Manager

SEE PROJECT ACCOMPLISHMENTS ATTACHED.

Professional Services Rendered Through the Month of September 2010.

Labor

Employee Type Hours Amount
Project Manager 59.00 6,785.00
Labor Total 59.00 6,785.00

Reimbursable

Expense Total 0.00
Invoice Total 6,785.00

10-7-10
OK RS

I ASKED DAVE TO BREAK OUT TIME RELATED TO THE CLINGER ISSUE

Payment Terms: Net Thirty (30) Days; Credit Cards Accepted

When Creativity & Experience Count

515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com

Project Accomplishments
B E Project No. 09-2532-1
East Goshen / Ridley Creek Sewage Treatment Plant / Clinger
September 2010

The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project regarding Clinger matters:

  • 9-7-10 Review and evaluate Contractor documents and prepare memo and spreadsheet detailing the evaluation results for the 9-8-10 Special Meeting.
  • 9-8-10 Attend and present information 7:30 a.m. Special Meeting with Board, Township, Pennoni reps and Steve McDonnell.
  • 9-21-10 Prepare data and documentation for review, presentation and discussion at the 9-22-10 Special Meeting.
  • 9-22-10 Attend 7:30 a.m. Special Meeting with Board, Township, Pennoni reps and Steve McDonnell.
  • 9-28-10 Records review and evaluation and spreadsheet preparation for 9-30-10 Special Meeting.
  • 9-30-10 Prepare for and attend 7:30 a.m. Special Authority Meeting with Board, Township, Pennoni reps and Steve McDonnell.

NOTE:

  • From April through August 2010, Brickhouse spent 36.5 hours on special Clinger issues initially presented in their March 15, 2010 letter. These hours were out of the scope of Brickhouse's original Project Management contract. However, they were invoiced to and paid by the Authority under the original contract (Task # 0). During September 2010, Brickhouse attributed 59 hours to the out of scope Clinger issues under Task # 1.
  • Therefore, the total hours available for Project Management in the original contract budget were reduced by the 36.5 hours (April through August 2010, Task # 0) plus the 59 hours (September 2010, Task #1) for a combined total of 95.5 hours.

J:\092532.1\Clinger\September 2010 Bullets.doc

Brickhouse Environmental
Consultants and Engineers

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Invoice number: 5559
Date: 10/1/2010
Client ID: 548

Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering

Attn: Mr. Rick Smith, Township Manager

SEE PROJECT ACCOMPLISHMENTS ATTACHED.

Professional Services Rendered Through the Month of September 2010.

Labor

Employee Type Hours Amount
Project Manager 93.00 10,695.00
Labor Total 93.00 10,695.00

Reimbursable

Expense Total 0.00
Invoice Total 10,695.00

10-7-10
OK RS

Payment Terms: Net Thirty (30) Days; Credit Cards Accepted

When Creativity & Experience Count

515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com

Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
September 2010

The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:

  • 9-2-10 Prepare for and attend biweekly Progress Meeting.
  • 9-2-10 Assist electrical engineer in plant inspection towards developing a punch list for electrical items to be completed.
  • 9-9-10 Site visit to check construction progress and operation issue: Disc Filter solids losses; Effluent Flow Box meter totalizing. Davco #1 inner and outer rings in operation; Davco #2 being filled from MH. Clinger foreman & 2 journeymen installing exterior lighting and security at Control Building rear.
  • 9-9-10 Prepare Project Manager's Report for the Authority's 9-13-10 Monthly Meeting.
  • 9-10-10 Site visit to check construction progress and filling of Davco # 2 for hydrostatic testing. Hammond McCloskey Plumbing & Heating on site at 9:20 to work in the Control Building. Davco #2 filling surface is 56 inches from grating. Leak inspection results: Interior wall dry at all penetration patch welds. One drip / sec. at 16" pipe into tank inner ring at southern base (probable valve). All walls (interior inner and exterior outer are dry). Clinger has 1 foreman and 2 journeymen on site working in the Dewatering Building.
  • 9-13-10 Site visit to check construction progress and Davco # 2 testing status. No visable leaks at Davco #2. All welds and bolt seal holding. Clinger has 1 foreman and 2 journeymen working at Davco catwalk and Control Building. Worth has 1 foreman and 3 laborers on site. One alum pump not working.
  • 9-13-10 Prepare for and attend Authority Monthly Meeting.
  • 9-14-10 Site visit to check construction progress and security system training. Kratos rep (Willard Lockerman) installed security system and provided training to Township personnel. Clinger foreman and 2 journeymen in Treatment Building.
  • 9-14-10 Screen Building influent channel debris removed. Plan to do again on 9-21 and document debris volume.
  • 9-16-10 Prepare for and attend bi-weekly Progress Meeting.
  • 9-17-10 Site visit observations: Construction trailers removed from Basin # 1 area. With exception of Worth trailer (relocated to contractor's upper parking area at plant driveway gate) all trailers removed from the site. Areas north of Control Building and Davcos regraded. Man door installed on east side of Centrifuge Room. Clinger foreman and 2 journeymen depart site at 1:45 p.m.
  • 9-21-10 Screen Building influent channel debris removed and volume documented.
  • 9-23-10 Site visit observation of excavation commencement for Basin # 1. Treatment Building SE corner roof drain will be tied into hard piping from building's east side surface inlet to the basin. Filters and compartments need to be flushed.
  • 9-30-10 Prepare for and attend 7:30 a.m. Special Authority Meeting with Board, Township, Pennoni reps and Steve McDonnell.
  • 9-30-10 Prepare for and attend bi-weekly Progress Meeting. Main topics included: Alum pump 10-5-10 inspection; call to Siemens re: set ups and adjustments; SBR lead / lag pump operation; addition / omission / jumpers of UV system wiring; substantial completion definition; Punch List to be sent by Pennoni to contractors by end of 10-8-10.
  • During the month of September, Brickhouse spent considerable time on Clinger matters and at the plant on start up / testing / performance / and trouble shooting.

Notes:

  1. Brickhouse's project management involvement was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours.
  2. The duration of Brickhouse's involvement was extended, without need to increase the total contract hours or value to due to Brickhouse being under the original budget. This extension was to week ending October 10, 2010 and attendance at the October 11, 2010 Monthly Authority Meeting.
  3. This time extension plus the additional efforts expended on unanticipated trouble shooting at the plant and on out of scope Clinger matters and have now expended the hours in the original budget.

J:\092532.0\September 2010 Bullets.doc

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement

The original budget estimate was adjusted from 67 weeks for a cumulative $175,030 (at $115/hour) to 76 weeks for the same cumulative $175,030 (at $115/hour) in order to reflect actual total as of September 30, 2010 as a new baseline.

Week Ending Projected Totals Actual Totals
Project Management Cumulative Hours Cumulative Fees Monthly Fees Project Management Cumulative Hours Cumulative Fees Monthly Fees
30-Sep-10 Week 75 1,489 $171,282.50 $17,480.00 1,489 1,489 $171,282.50 $17,480.00
3-Oct-10 Week 75 (1 day) 5 1,494 $171,810.00
10-Oct-10 Week 76 28 1,522 $175,030.00

Brickhouse's contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours.

The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting, without increase in hours.

From April through September 2010, Brickhouse spent 95.5 hours on out of scope matters that were included in the total hours. The original 1,522 hours have now been expended.

J:\092532.0\Project Management\PM Schedule\Schedule_Revised.xls

Page 1 of 1

5. MINUTES 6 pgs

Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
September 13, 2010

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday September 13, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Fran Beck, Jack Yahraes, Dana Pizarro and Joseph McCawley. Also in attendance were: Rick Smith, Township Manager; Scott Fowler from Brickhouse Environmental; Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; Carmen Battavio, Township Supervisor; Mark Miller, Director of Public Works; Megann Hedgecock, Planning Commission; and Walter Wujcik, Conservancy Board.

COMMON ACRONYMS:

MA- Municipal Authority I&I – Inflow & Infiltration
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant
CB – Conservancy Board DEP – Department of Environmental Protection
PR – Park & Recreation Board EPA – Environmental Protection Agency
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
SSO – Sanitary System Overflow WAS – Waste Activated Sludge

1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. Jack asked if anyone was taping the meeting. There was no response.

2. RCSTP REPORTS

A. Brickhouse Report

Scott reported that significant completion of Phase II and III was concurrent during the month of August and beginning of September for the Ridley Creek Sewage Treatment Plant (RCSTP) upgrade and expansion project. Substantial completion of the project is anticipated as September 17, 2010, including removal of job trailers. Significant milestones achieved during this period included the following:

  • Installation, start up and training for the centrifuge dewatering system,
  • Completion of the sandblasting and painting of the existing Davco tanks,
  • Installation of the conduit, wires and equipment at the Davco tanks,
  • Installation, start up and training for the disc filter feed pumps,
  • Installation of the security system components, and
  • Start up of the Allied Controls System control panel which includes the effluent flow equalization pumps, disc filters, UV disinfection system, chemical feed systems and utility water system monitoring.

EGTMA Staff back filled and installed concrete in the electrical conduit trench extending from the new treatment building to the existing control building and Davco tanks. Installation of concrete pads at the entrance to the overhead garage doors and entrance door way for the sludge dewatering building was completed.

MA Minutes 09/13/2010 1

2 of 6

Operation of the SBRs, disc filters and UV disinfection equipment continued. The trends for the dissolved oxygen and hydraulic loading during the early morning to noon have been consistent during the month. Utilization on site laboratory for process control monitoring and testing is ongoing and beneficial for adjusting the treatment process. Performance testing of the SBRs, centrifuge dewatering systems and overall treatment process is anticipated during the month of October 2010. The NPDES permit limitations for the SBR treatment process is not anticipated until November. Coordination with PADEP representatives and the Municipal Authority is planned prior to formalizing the new NPDES discharge permit limitations.

Additional meetings between representatives from the Municipal Authority, Pennoni Associates, Brickhouse Environmental and the Authority's Solicitor were conducted to discuss the outstanding claims and delays regarding the project.

Scott gave a detailed explanation of the new process versus the old process. Jack suggested that the Members review "Concerns to Monitor" starting on page 7 of the Brickhouse report. Jack commended Scott on the good job he has done for the Authority.

B. Pennoni – Dan Barbato, reported the following:

RCSTP Upgrade and Expansion

  • Construction phase services continue including: progress meetings with the contractors and township every other Thursday; observation services continue including coordination and communication with Brickhouse and the township; receipt, review, and return of contractor submittals; negotiation, review, and approval of Payment Requests.
  • A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail.
  • An estimate of Pennoni effort to observe the remaining construction, start-up activities, contract close-out, and as-built drawing preparation is being provided separately. The new tentative substantial completion date is September 10, 2010, as presented by Worth and Co. at the August 19, 2010 progress meeting.
  • Punchlist generation is in progress and preparations are being made for contractor demobilization.

I/I Metering Project

  • The Township continues to meter flows at selected locations. Metering data for five locations is being reviewed through August. Meters are still installed and collecting data. The Township has provided updated data.

Ridley Creek Consent Order

  • The next report is due to DEP by September 30, 2010. We are reviewing meter data, rainfall data and progress reorts in preparation for the report submittal and address comments received from Mr. Goldberg of DEP on 6/8/2010.

MA Minutes 09/13/2010 2

3 of 6

LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning

  • These documents were provided to the Township for submittal to DEP. We received comments from DEP and are in the process of addressing the comments.

Marydell PS Elimination Planning

  • The notification letters (Component 4) and associated documents are being prepared for distribution to planning and health department for their review and comment.

Wastewater Contract Operations Bid

  • The Authority will seek a new contract for wastewater system operations in 2011. Pennoni will assist with generation of the scope of work and bid documents.

Applebrook Comprehensive Groundwater Evaluation

  • Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. We will proceed with the evaluation near the end of this month.

Dan mentioned that DEP has determined that the Applebrook permit can be renewed. Jack stated that Artesian won't be bidding on the contract.

C. Cost Summary – Report was reviewed. Rick asked Scott to check on the items for Worth & Co. which show a total of -$1,400.64. Rick reviewed the items under Potential capital extras on page 9, and noted that the Projected Final Cost is $9,626,983.79 as shown on page 10.

D. Change Orders – None

RCSTP CHANGE ORDERS

A. None.

3. RCSTP INVOICES

A. Pip Xpress, Inc., #48010, 8/31/10, $2,623.51 Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

B. Office Depot, #528256899001, 8/3/10, $46.08. Fran moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

C. Office Depot, #528256923001, 8/3/10, $43.27. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

MA Minutes 09/13/2010 3

Ag 6

D. Brickhouse Environmental, #5542, 9/1/10, $14,087.50. Fran moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

E. Gawthrop Greenwood, #82227, 8/31/10, $1,310.00. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

F. Main Line Concrete, $357.00. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

G. Pip Xpress, $465.02. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

4. CHAIRMAN'S REPORT

A. Jack mentioned that Mike Steinberger will be submitting his resignation between now and the end of the year. Dana will take over his responsibilities as Treasurer.
B. Jack stated that the data that Steve McDonnell needs will be organized for the next meeting with him.

5. APPROVAL OF MINUTES

A. Fran moved to approve the minutes of the August 9, 2010 regular meeting as corrected. Joe seconded the motion. The motion passed unanimously.

6. ENGINEER'S REPORT – See 2B.

7. APPROVAL OF INVOICES

A. Gawthrop, #82225, 8/31/10, $589.00. Joe moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
B. Worth & Co., #P28001, 8/31/10, $227,050.00. Fran moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
C. Clinger, $30,597.44. Fran moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
D. Pennoni, #449279, 8/26/10, $291.25. Fran moved to approve payment. Joe seconded the motion. There was no further discussion. The motion passed unanimously.
E. Pennoni, #449326, 8/26/10, $500.00. Fran moved to approve payment. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
F. Pennoni, #449313, 8/26/10, $12,393.25. Joe moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
G. Pennoni, #449306, 8/26/10, $2,490.75. Joe moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
H. Pennoni, #449283, 8/26/10, $802.50. Joe moved to approve payment. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

MA Minutes 09/13/2010 4

5 of 6

8. LIAISON REPORTS

A. Historical Commission – Jack mentioned that this Sat. September 18, 2010 there will be an illumination and tours at the Paoli Battlefield at 7:00 p.m.
B. Conservancy Board – Walter reported that with Mark’s help, they watered the trees at the Reservoir Road project. They will be planting 10-20 more trees shortly.
C. Planning Commission – No report.

9. FINANCIAL REPORTS

The report was reviewed and the Authority members were pleased with the new format. Rick will recommend to the Board of Supervisors to enter a Funding Source line item for Municipal Authority sewer operating sources.

10. GOALS

Dana will provide an article by Nov. 11, 2010 for the next Township newsletter. Jack mentioned that a facilities tour may be planned for the Spring of 2011. Jack asked Rick to have items under Ridley Creek Project #2 and #3, last lines highlighted. This indicates the item is completed.

11. OLD BUSINESS

A. Comprehensive Plan – The members reviewed the goals. Rick suggested that they concentrate on the 3 items with a high priority. Jack will meet with Rick to write a summary for the next meeting.

12. NEW BUSINESS

A. None

13. CAPACITY REQUESTS

A. None

14. SEWER REPORTS

A. Mark Miller reported the following:
Meter: All meters were read on a daily basis. No problems occurred over the month.

C.C. Collection: All pumping stations were visited on a daily basis. Routine maintenance was performed.

R.C.Collection: Pumping stations were visited on a daily basis with no problems to report. They completed the manhole lid replacement in the Bowtree Development. They are currently switching out lids in the Hunt Country Development.

Ridley Creek Plant: The Public Works Department installed a concrete pad outside the sludge processing building. The excavating contractor is scheduled to begin grading. Once they finish the Public Works Department will begin to prep the area for paving.

ACTION ITEM: The current Sludge dumpster needs to be replaced. Mark contacted our hauler who gave him a price of $2,500.00. The container is water tight. Mark inspected it

MA Minutes 09/13/2010 5

6 of 6

and feels $2,500.00 is okay. Joe moved to authorize up to $3,000.00 for Mark to make this purchase. Fran seconded the motion. There was no further discussion. Motion passed unanimously.

Lochwood Plant: Plant operation was normal for the month.

PA One Calls: We received 118 PA One calls for the month of August.

Alarms: 22 alarms for the month of August ranging from power outages to high levels.

15. ANY OTHER MATTER

None

16. CORRESPONDENCE

None

17. PUBLIC COMMENT

None

18. ADJOURNMENT

There being no further business, Joe moved to adjourn the meeting. Fran seconded the motion. The meeting was adjourned at 8:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 09-13-10 draft.doc

MA Minutes 09/13/2010 6

8. INVOICES

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 452079
Invoice Date : 09/29/2010
Project : EGMA1000
Project Name : 2010 Annual Services

For Services Rendered through: 09/19/2010

Preparation and participation in monthly board meeting and consultation with Township, preparation of monthly report.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor :918.75
Expense :0.00
Phase Total :918.75
Amount Due This Invoice$918.75
Fee :10,338.25
Prior Billings :9,419.50
Current Billings :918.75
Total Billings :10,338.25

Phase : **** -- Professional Services

Labor

Class Hours/ Units Rate Amount
Senior Engineer 1.00 105.00 105.00
Authority Engineer 7.75 105.00 813.75
Labor Total: 8.75 918.75
Total Phase : **** -- Professional ServicesLabor :$918.75
Expense :$0.00
Total Project : EGMA1000 -- 2010 Annual ServicesLabor :$918.75
Expense :$0.00

dc RS 10-6

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1000 Invoice Summary.xls
Invoice Date 09-29-2010

Project:2010 Annual Services
Pennoni Job No.:EGMA 1000
Invoice No:452079
Invoice Period:7/19/2010to8/15/2010
Initial Authorization:$ 10,338.25Date:1/11/2010
Changes:$ -Date:
Contract Amount:$ 10,338.25
Previously Invoiced:$ 9,419.50
Current Invoice:$ 918.75
Invoiced to Date ($):$ 10,338.25
Invoiced to Date (%):100%
Remaining Budget ($):$ -
Remaining Budget (%):0%

Budget by Phase:

Phase No.****
Phase Name:2010 Annual Services
Phase Budget:$ 10,338.25
Previously Invoiced:$ 9,419.50
Current Invoice:$ 918.75
Invoiced to Date ($):$ 10,338.25
Invoiced to Date (%):100%
Remaining Budget ($):$ -
Remaining Budget (%):0%

Comments: Preparation and participation in monthly board meeting and consultation with Township, preparation of monthly report.

8. INVOICES

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 452027
Invoice Date : 09/29/2010
Project : EGMA0903
Project Name : RCSTP Sewer Modeling

For Services Rendered through: 09/19/2010

Draft semi-annual report to DEP as required by the CO&A. Consultation with Township.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor :517.50
Expense :0.00
Phase Total :517.50
Amount Due This Invoice$517.50
Fee :30,670.00
Prior Billings :28,271.50
Current Billings :517.50
Total Billings :28,789.00

Phase : **** -- Professional Services

Labor

Class Hours/ Units Rate Amount
Project Engineer 5.75 90.00 517.50
Labor Total: 5.75 517.50
Total Phase : **** -- Professional ServicesLabor :$517.50
Expense :$0.00
Total Project : EGMA0903 -- RCSTP Sewer ModelingLabor :$517.50
Expense :$0.00

ok RS 10-6

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA0903 Invoice Summary.xls
Invoice Date 09-29-2010

Project:RCSTP Sewer Modeling
Pennoni Job No.:EGMA 0903
Invoice No:452027
Invoice Period:8/16/2010to9/19/2010
Initial Authorization:$ 28,300.00Date:9/17/2009
Changes:$ 2,370.00Date:9/15/2010
Contract Amount:$ 30,670.00
Previously Invoiced:$ 28,271.50
Current Invoice:$ 517.50
Invoiced to Date ($):$ 28,789.00
Invoiced to Date (%):94%
Remaining Budget ($):$ 1,881.00
Remaining Budget (%):6%

Budget by Phase:

Phase No.
Phase Name:RCSTP Sewer Modeling
Phase Budget:$ 30,670.00
Previously Invoiced:$ 28,271.50
Current Invoice:$ 517.50
Invoiced to Date ($):$ 28,789.00
Invoiced to Date (%):94%
Remaining Budget ($):$ 1,881.00
Remaining Budget (%):6%

Comments: Draft semi-annual report to DEP as required by the CO&A. Consultation with Township.

11. GOALS
2 pgs

2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
OCTOBER REPORT

ON-GOING

  1. Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - Completed; Need by 8/11/10 Joe – Mark - Completed; Need by 11/10/10 Dana
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana – Not Completed; 3 rd Quarter (September) Joe - Completed - Attended the August meeting; 4 th Quarter (December) Jack
  3. Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10). West Pike Township request received on August 6, 2010, MA directed staff to look into on August 9, 2010
  4. Implement I&I Plan. – Completed and Ongoing – March Report filed on time, September Report filed in time, I&I repair work continues.
  5. Conduct a sewer facilities tour after RCSTP construction is complete

RIDLEY CREEK PROJECT

  1. Monitor construction.
  2. Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. Completed - SBR Tour conducted on 3/15/10
  3. Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. Completed - SBR Class conducted on 3/15/10
  4. Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)

ACT 537 PLANNING

  1. Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. BoS adopted Resolution 10-106 on 6/15/2010. Revisions sent to PA DEP on 6/16/10. Received DEP 7/13/10 review letter. Currently working on response.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\101110.doc

2 of 2

  1. Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. BoS adopted resolutions 10-105 and 10-108 on 6/15/10. Revisions sent to PA DEP on 6/16/10. Received DEP 7/14/10 review letter. Currently working on response.
  2. Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
  3. Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
  4. Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Obtained agreement on diversion from West Goshen on 5/13/10.

FUNDING

  1. H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. Completed - We have received the money. Used grant money to pay Worth and Clinger August invoices

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\101110.doc

12. OLD BUSINESS
Comp Plan Goals
6 pgs

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: October 5, 2010
To: Municipal Authority
From: Rick Smith, Township Manager
Re: Comp Plan Goals

Jack and I met on October 5 to review the Authority’s Comp Plan Goals and our findings are as follows:

Item 1 7B-4 Evaluate the need to provide sewer service across Township Boundaries
Action - Consider the cost effectiveness of extending services to areas outside the Township
Priority - High
Timeframe - Ongoing
Status- Active

The Authority has considered several requests from property owners in Willistown to provide sewer service via our sewer line in Line Road. The majority of these requests have been approved. We recently approved capacity, with conditions for five homes for Michael Mirarchi. All of these requests were granted at no cost to the Authority. We are currently reviewing a request from West Pikeland Township for 20,000 GPD.

We are not aware of any projects or vacant ground in West Goshen, Westtown, East Whiteland or West Whiteland that would need sewer capacity from us. There may be additional opportunities with Willistown. However, we would suggest that the Authority continue with it current policy of reacting to requests.

Suggest status be changed to - Completed and Ongoing

Item 2 7B-5 Provide for upgrading of existing public sewer lines and wastewater treatment facilities
Action – Evaluate the existing sewer lines and connections to ensure the system is free of infiltration and other problems
Priority - High
Timeframe – Ongoing
Status - Active

We are finishing up the RCSTP Expansion and Upgrade Project, in the planning stages of projects to abandon Lockwood STP, eliminate the Marydell and Reserve Pump Stations, and

F:\Data\Shared Data\Admin Dept\Comp Plan\Nunicipal Authority\Status 100510.doc

2 of 6

redirect the Hershey Mill Pump Station. We also have a very aggressive I&I Program. We recently slip lined sewer lines in Waterview and lined manholes in Waterview and Bittersweet.

Suggest status be changed to - Completed and Ongoing

Item 3 7B-3 Evaluate the Township Act 537 Plan and update as need to address areas lacking service in the Township
Action – Review the Township Act 537 Plan bi-annually or as often as necessary
Priority - Medium
Timeframe - Ongoing
Status – Completed and ongoing

In 2007 we looked extensively into the possibility of providing sewer service to Charter Chase & Brookmont. The conclusion was that since the soils in both neighborhoods where generally suitable and the cost per connection was prohibitive that the Township would not proceed with installing public sewer. Both of these neighborhoods consist of one acre lots situated in a relatively compact area. Goshen Downs is another neighborhood of one acre lots, with on-lot sewer systems and we have taken a cursory look at it as well and concluded that the cost per connection would be prohibitive as well. These three neighborhoods comprise almost half of the homes with on-lot systems, with the remaining on-lot systems fragmented for the most part in the northern part of the Township. Accordingly, if the cost per connection for Charter Chase and Brookmont are prohibitive, the cost per connection for the remaining lots would be even higher.

We also completed the Wastewater Needs Analysis in 2007. As part of this Analysis we indentified the vacant properties that would need sewer capacity and incorporated them into the Analysis. The Analysis was submitted to PA DEP and will be used as the basis for future updates to the Act 537 Plan.

Status of - Completed and Ongoing – is appropriate

Item 4 7B-5 Provide for upgrading of existing public sewer lines and wastewater treatment facilities
Action – Evaluate new technologies and existing equipment needs
Priority - Medium
Timeframe - Ongoing

When initially looked into the MBR process for the RCSTP project, but abandoned it due to the high cost. We finally settled on the SBR process, which while not a “new” technology is definitely a proven method of sewer treatment. We also used heat cured slip lining to rehabilitate sewer lines in Waterview and used a similar process to reline manholes in Waterview and Bittersweet.

We have recently studied the Marydell Pump Station and concluded that is was cost effective to eliminate it as opposed to replacing it. We are currently in the Act 537 planning process.

Status of - Completed and Ongoing – is appropriate

F:\Data\Shared Data\Admin Dept\Comp Plan\Nunicipal Authority\Status 100510.doc

3 of 6

Item 5 7B-3 Evaluate the Township Act 537 Plan and update as need to address areas lacking service in the Township
Action – Review the Township Act 537 Plan to ensure consistency with the Comprehensive Plan
Priority - High
Timeframe - Intermediate

We looked extensively into the possibility of providing sewer service to Charter Chase & Brookmont in 2007. The conclusion was that since the soils in both neighborhoods where generally suitable and they cost per connection was very high that the Township would not proceed with installing public sewer.

We also completed the Wastewater Needs Analysis in 2007. As part of this Analysis we indentified the vacant properties that would need sewer capacity and incorporated them into the Analysis. The Analysis was submitted to PA DEP and will be used as the basis for future updates to the Act 537 Plan.

Suggest status be changed to - Completed and Ongoing

Item 6 7B-3 Evaluate the Township Act 537 Plan and update as need to address areas lacking service in the Township
Action – Based on the review the Act 537 Plan implement recommendations and updates as necessary
Priority - Immediate
Timeframe - Medium

We looked extensively into the possibility of providing sewer service to Charter Chase & Brookmont in 2007. The conclusion was that since the soils in both neighborhoods where generally suitable and they cost per connection was very high that the Township would not proceed with installing public sewer. Both of these neighborhoods consist of one acre lots situated in a relatively compact area. Goshen Downs is another neighborhood of one acre lots that have on-lot sewer systems. These three neighborhoods comprise almost half of the homes with on-lot systems, with the remaining on-lot systems fragmented for the most part in the northern part of the Township. Accordingly, if the cost per connection for Charter Chase and Brookmont are high, the cost per connection for the remaining lots would be higher.

We also completed the Wastewater Needs Analysis in 2007. As part of this Analysis we indentified the vacant properties that would need sewer capacity and incorporated them into the Analysis. The Analysis was submitted to PA DEP and will be used as the basis for future updates to the Act 537 Plan.

Status of - Completed and Ongoing – is appropriate

F:\Data\Shared Data\Admin Dept\Comp Plan\Nunicipal Authority\Status 100510.doc

4 of 6

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: August 12, 2010
To: Planning Commission
Municipal Authority
Park & Rec Board
Conservancy Board
Historical Commission
From: Rick Smith, Township Manager
Re: Comprehensive Plan Goals

Background - The Comprehensive Plan (Plan) that the Board of Supervisors adopted on June 21, 2005 identifies a series of action items that need to be completed in order to accomplish the goals set forth in the Plan. These action items are set forth in Chapter 10 of the Plan.

Chapter 10 lists the timeframe for completion, the priority, the method of implementation and the party responsible for each action item. A recent review indicates that while we as a Township have made significant strides in completing the action items the work is not yet complete.

Enclosed is a list of the applicable action items for each ABC. This list only includes a summary of each action and additional information is available in the Plan. The complete Plan is available on the Township web page, if you would like a hard copy of the plan just let me know.

Required Action - The Board would like each ABC to review their list of action items to see which items can be competed by year-end. The ABC would report on these at the Annual Planning Session. In addition, each ABC should use their list of action items as a basis for determining their goals for 2011.

Enclosures

Cc: Board of Supervisors
Staff Liaisons

F:\Data\Shared Data\ABC'S\Goals\COMP PLAN GOALS\Memo to ABCs 081210.doc

5 of 6

Chapter 7 – Community Facilities and Services Plan

ACTIONS NEEDED:

7B-2-1 Continue to be a leader in water resource management by advocating a regional approach with adjacent municipalities.
7B-2-2 Participate in regional partnerships with municipalities within the Chester and Ridley Creek watersheds to address the key concerns of water supply and quality, including stormwater management.

➔ Recommendation 7B-3 Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township.

DISCUSSION:
Public sewers serve 63% of all dwellings in East Goshen. An additional 22% of dwellings are accommodated through the private sewer system at Hershey’s Mill Village. The Township has adopted a program requiring the regular pumping of existing on-lot sewer systems. The Township encourages the hookup of dwelling units to the public sewer system. The development of the remaining undeveloped lands in the Township may require extensions of the public sewer system.

ACTIONS NEEDED:

7B-3-1 Review the Township Act 537 Plan to ensure consistency with the Comprehensive Plan.
7B-3-2 Based on the review of the Act 537 Plan, implement recommendations and updates as necessary.
7B-3-3 Review the Township Act 537 Plan at a minimum of bi-annually or as often as necessary.

➔ Recommendation 7B-4 Evaluate the need to provide sewer service across Township boundaries.

DISCUSSION:
The Township is already coordinating the transmission and treatment of wastewater with the West Goshen Municipal Authority. The provision of additional services across boundaries (in the form of actual sewer service lines) should be a consideration if adjacent lands along the Township border are in need of service, consistent with the needs and objectives of neighboring municipalities.

ACTIONS NEEDED:

7B-4-1 Consider the cost-effectiveness of extending services to areas outside the Township.

➔ Recommendation 7B-5 Provide for the upgrading of existing public sewer lines and wastewater treatment facilities.

DISCUSSION:
The Township, through the Municipal Authority, already provides for the continual maintenance of the wastewater treatment facility and existing system lines and connections. Technological improvements and equipment upgrades can continue the long-term service life of the wastewater treatment facility.

ACTIONS NEEDED:

7B-5-1 Evaluate new technologies and existing equipment needs.
7B-5-2 Evaluate the existing sewer system lines and connections to ensure the system is free of stormwater infiltration and other problems.

East Goshen Township Comprehensive Plan Page 7-4 June 2005

6 of 6

Comprehensive Plan Actions
Municipal Authority

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
7B-4
#1
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the need to provide sewer service across Township boundaries. 1 - On-going 1 - High Consider the cost-effectiveness of extending services to areas outside the Township. Evaluation of service extensions on a case-by-case basis, and through cost-factor analysis prior to requests made. Active
7B-5
#2
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Provide for the upgrading of existing public sewer lines and wastewater treatment facility. 1 - On-going 1 - High Evaluate the existing sewer system lines and connections to ensure the system is free of stormwater infiltration and other problems. Municipal Authority Capital Improvements Budget Active
7B-3
#3
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township. 1 - On-going 2 - Medium Review the Township Act 537 Plan at a minimum of bi-annually or as often as necessary. Township Act 537 Plan Completed and On-Going
7B-5
#4
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Provide for the upgrading of existing public sewer lines and wastewater treatment facility. 1 - On-going 2 - Medium Evaluate new technologies and existing equipment needs. Municipal Authority Capital Improvements Budget Completed and On-Going
7B-3
#5
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township. 2 - Immediate 1 - High Review the Township Act 537 Plan to ensure consistency with the Comprehensive Plan. Township Act 537 Plan No Action
7B-3
#6
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township. 2 - Immediate 2 - Medium Based on the review of the Act 537 Plan, implement recommendations and updates as necessary. Township Act 537 Plan Completed and On-Going

13. NEW BUSINESS
a.
1 pg

Rick Smith

From: Rick Smith [rsmith@eastgoshen.org]
Sent: Wednesday, October 06, 2010 1:54 PM
To: 'Barbato, Daniel'
Subject: RE: September invoices

Dan

I will add the budget increase request to the agenda for Monday night.

Rick Smith, Township Manager
East Goshen Township

-----Original Message-----
From: Barbato, Daniel [mailto:DBarbato@Pennoni.com]
Sent: Monday, October 04, 2010 10:45 AM
To: Rick Smith
Subject: FW: September invoices

I know last week was busy, but I wanted to make sure you saw the part about the Annual Services busget as detailed below.

Daniel P. Barbato, P.E.
Pennoni Associates Inc.
Phone 302-655-4451 | Mobile 302-379-8240

-----Original Message-----
From: Barbato, Daniel
Sent: Wednesday, September 29, 2010 1:20 PM
To: Rick Smith
Cc: 'Mark Miller (mmiller@eastgoshen.org)'
Subject: September invoices

Attached are our invoices for September.

It looks like EGMA 1000 - Annual Services is at the budget limit. The original budget was $10k, and today we are at the budget. This budget included Chapter 94 reports and Authority meetings. Do we need to adjust this budget for the remainder of the year? I am sensitive to budgets and want to make sure we are ok with you contractually. If we need to adjust, I would increase the budget by another $3,000. Changing this will not affect this set of invoices.

Daniel P. Barbato, P.E.
Pennoni Associates Inc.
Phone 302-655-4451 | Mobile 302-379-8240

I WOULD RECCOMEND YOU INCREASE AS SUGGESTED BY DAN.

RS 10-6-10

1

15. SEWER REPORTS b. 7pgs

2010 FLOWMETERS

2010 SEPTEMBER 3RD QUARTER

Precip WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT NET
Inches DATE READING GPD READING GPD READING GPD READING GPD GPD FLOWS DATE
0.0009/01/101,777,2151,100,00015,324,496154,7708,462,94665,2509,851,180127,91020,400752,07009/01/10
0.0009/02/101,778,2511,036,00015,339,030145,3408,469,49965,5309,863,354121,74020,400703,39009/02/10
0.0009/03/101,779,3161,065,00015,353,907148,7708,475,80363,0409,875,590122,36020,400730,83009/03/10
0.0009/04/1020,400009/04/10
0.0009/05/1020,400009/05/10
0.0009/06/1020,400009/06/10
0.0009/07/1020,400009/07/10
0.0009/08/101,784,202977,20015,426,180144,5468,506,33961,0729,911,50371,82620,400699,75609/08/10
0.0009/09/101,785,197995,00015,440,333141,5308,512,64763,0809,920,37088,67020,400701,72009/09/10
0.0009/10/101,786,2161,019,00015,455,303149,7008,518,60459,5709,927,71473,44020,400736,29009/10/10
0.0009/11/1020,400009/11/10
0.3509/12/1020,400009/12/10
0.0009/13/101,789,176986,66715,500,048149,1508,532,44746,1439,946,99864,28020,400727,09309/13/10
0.0009/14/101,790,2321,056,00015,514,023139,7508,538,09156,4409,955,94689,48020,400770,33009/14/10
0.2509/15/101,791,2571,025,00015,528,842148,1908,542,69045,9909,964,22082,74020,400748,08009/15/10
0.0009/16/101,792,2611,004,00015,540,973121,3108,547,32546,3509,972,17079,50020,400756,84009/16/10
0.0009/17/101,793,2891,028,00015,551,499105,2608,552,12347,9809,980,33881,68020,400793,08009/17/10
0.0009/18/1020,400009/18/10
0.0009/19/1020,400009/19/10
0.0009/20/101,796,3101,007,00015,584,383109,6138,566,05146,42710,003,26076,40720,400774,55309/20/10
0.1009/21/101,797,269959,00015,594,04096,5708,570,62245,71010,011,76485,04020,400731,68009/21/10
0.0009/22/101,798,3821,113,00015,605,416113,7608,575,49548,73010,021,25494,90020,400855,61009/22/10
0.0009/23/101,799,357975,00015,614,74593,2908,580,07945,84010,032,106108,52020,400727,35009/23/10
0.0009/24/101,800,4001,043,00015,624,798100,5308,584,95048,71010,043,103109,97020,400783,79009/24/10
0.0009/25/1020,400009/25/10
0.3309/26/1020,400009/26/10
0.2009/27/101,803,4291,009,66715,656,700106,3408,602,23857,62710,068,86985,88720,400759,81309/27/10
0.3409/28/101,804,5241,095,00015,668,090113,9008,608,82565,87020,400915,23009/28/10
0.2009/29/101,805,5911,067,00015,679,121110,3108,612,89140,66010,092,316117,23520,400798,79509/29/10
1.2509/30/101,806,6781,087,00015,691,143120,2208,617,54246,51010,102,994106,78020,400813,49009/30/10
3.021,032,377125,64256,13394,124727,609

DAILY LOC INQUIRER EG TWP
MONTH TO DATE 3.02
NORMAL MONTH TO DATE
YEAR TO DATE 44
NORMAL YEAR TO DATE

f:/data/users/joanna/2003 flowmeters 10/6/20109:20 AM

2 of 7

2010 FLOWMETERS

2010 SEPTEMBER 3RD QUARTER

HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR SHERMAN BARKWAY
READING GPD READING GPD READING GPD READING GPD READING GPD READING GPD
19,498,99354,470908,07760,00012,578,014367,660103,646,061713,720411,2255,1401,639,49010,970
19,502,66636,730908,65958,20012,612,703346,890103,714,581685,200411,7465,2101,640,56610,760
19,507,32546,590909,22156,20012,647,238345,350103,782,025674,440412,2284,8201,641,5269,600
19,529,62544,600912,23460,26012,778,629262,782104,078,620593,190414,7595,0621,646,55310,054
19,533,74341,180912,80256,80012,809,359307,300104,140,905622,850415,2384,7901,647,5469,930
19,538,24945,060913,39659,40012,838,979296,200104,203,326624,210415,7535,1501,648,68711,410
19,552,05646,023915,18959,76712,917,424261,483104,382,036595,700417,3935,4671,651,95310,887
19,556,73946,830915,78759,80012,951,669342,450104,448,615665,790417,9845,9101,653,01610,630
19,561,16744,280916,38259,50012,983,598319,290104,513,695650,800418,5535,6901,654,03010,140
19,565,62944,620916,95357,10013,014,900313,020104,576,805631,100419,0775,2401,654,9989,680
19,570,18545,560917,54459,10013,056,775418,750104,641,405646,000419,6505,7301,656,01910,210
19,583,78545,333919,37260,93313,170,824380,163104,823,159605,847421,3265,5871,659,43511,387
19,588,29145,060919,97159,90013,210,668398,440104,886,540633,810421,8995,7301,660,4269,910
19,593,26049,690920,60163,00013,253,555428,870104,953,833672,930422,6047,0501,661,55211,260
19,597,37141,110921,15555,40013,295,828422,730105,015,850620,170423,0944,9001,662,3948,420
19,601,95745,860921,72256,70013,338,973431,450105,082,148662,980423,6625,6801,663,44510,510
19,616,54848,637923,55561,10013,452,652378,930105,266,526614,593425,2645,3401,666,93911,647
13,501,018483,660105,338,484719,580
19,625,75446,030924,86165,30013,530,780297,620105,405,475669,910426,4475,9151,668,97710,190
19,630,13143,770925,56570,40013,564,848340,680105,475,290698,150426,9895,4201,669,97910,020
45,33959,940357,186650,0495,46510,401

f:/data/users/joanna/2003 flowmeters 10/6/20109:20 AM

3 of 7

2010 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY1,425,517123,26581,32563,99120,40083,711103,900363,921882,3675,62713,543
FEBRUARY1,462,759132,86674,79370,87920,40077,500103,327332,371906,3625,45613,156
MARCH1,603,009170,32875,60763,24020,400102,840146,865404,5261,071,1325,07119,213
APRIL59,434174,27989,04367,14820,40085,455126,703386,665991,2625,30313,956
MAY1,317,648145,69487,06254,67120,40063,58786,855355,426836,5625,80211,248
JUNE1,225,309126,60778,85770,23020,40057,79667,285353,596802,4735,80411,194
JULY1,106,553128,79461,615108,46020,40051,26361,149332,264727,5624,75110,465
AUGUST1,053,504149,15161,447107,88520,40047,98959,434324,438683,5585,4128,486
SEPTEMBER1,032,377125,64256,13394,12420,40045,33959,940357,186650,0495,46510,401
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave1,142,901141,84773,98777,84820,40068,38790,606356,710839,0365,41012,407

To West Goshen: 849,219

2010 flowmeters -all-stations separate month worksheets.xlsSUMMARY

4 of 7

September Precip 3.02

September

Precip.

3.5 3 2.5 2 1.5 1 0.5 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

snow/rain

5 of 7

Monthly Totals 2010 (Jan-Dec)

Monthly Totals

Precip.

9 8 7 6 5 4 3 2 1 0

Month

1 2 3 4 5 6 7 8 9 10 11 12

6 of 7

Flowmeters Sept. 2010

September

Flow#s

1000000 900000 800000 700000 600000 500000 400000 300000 200000 100000 0

Day of the Month

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

7 of 7

Monthly Totals 2010 Jan-Dec

Flowmeters

2500000 2000000 1500000 1000000 500000 0

Month

January February March April May June July August September October November December

610-692-7171
www.eastgoshen.org

FYI

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

September 20, 2010

Dear Property Owner:

As you may know, over the last two years the Township has received several applications to locate Wireless Communications Facilities in the center of the Township. In an attempt to address the needs of the wireless carriers, to find one wireless facility solution rather than several and to generate revenue for the Township; the Township is considering whether or not to construct a Wireless Communications Tower within the East Goshen Township Park on Paoli Pike.

The area of the park being considered for the tower site at this time is the western side of the soccer fields along the edge of the woods approximately 200′ from the northern property line and 200 feet from the park road and parking area.

The Board of Supervisors is seeking input from the public on this matter; your attendance and participation is highly encouraged. Everyone in attendance will have an opportunity to comment and ask questions. This notice has been sent to all property owners within 1000 feet of the Township Park property.

The Board of Supervisors will hear public comment at their meeting on October 5, 2010 at 7 PM.

All meetings are held at the Township Building and are open to the public and are subject to change. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[Signature]

Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Code Dept\Cellular Towers\BOS Meeting Ltr 09202010.doc