Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
November 8, 2010
Monday, 7:00 PM
EXECUTIVE SESSION: 7 – 8 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Cost Summary Report; Change Orders – none
- RIDLEY CREEK INVOICES a. Gawthrop Greenwood, #82932, 9/20/10 $ 1,242.50 b. O’Rourke and Sons, #164372, 10/7/10 $ 665.00 c. Charles Blosenski Disposal, 10/18/10 $ 2,531.00 d. Power Pro Equipment, #P32279, 10/13/10 $ 129.48 credit e. Power Pro Equipment, #P32136, 10/5/10 $ 2,073.90 f. Power Pro Equipment, #P32515, 10/27/10 $ 17.50 g. Martin Limestone, #302736, 10/18/10 $ 577.93 h. Martin Limestone, #302737, 10/18/10 $ 296.35 i. Martin Limestone, #302735, 10/18/10 $ 299.83 j. Vimco, #339422, 10/21/10 $ 270.75 k. Ransome Rental Co., #K0312001, 10/20/10 $ 608.00 l. Ransome Rental Co., #K0308701, 10/25/10 $ 1,984.00 m. Yerkes Assoc., #38547, 10/5/10 $ 571.88 n. Pennoni, #454783, 10/27/10 $ 12,326.15 o. Pennoni, #454693, 10/27/10 $ 1,620.00 p. Brickhouse Environmental, #5596, 11/1/10 $ 517.50 q. Brickhouse Environmental, #5595, 11/1/10 $ 8,826.25 r. Worth and Co., P28001, 10/31/10 $224,000.00 s.
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES October 11, 2010
- ENGINEER’S REPORT Pennoni Report
- APPROVAL OF INVOICES a. Gawthrop Greenwood, 82931, 9/30/10, $ 475.00 b. Pennoni, #454694, 10/27/10 $ 603.75 c. Pennoni, #454695, 10/27/10 $ 1,548.75 d. Pennoni, #454693, 10/27/10 $ 1,620.00 e. Martin Limestone, #302735, 10/18/10 $ 300.20 f. Martin Limestone, #302737, 10/18/10 $ 294.86
Monday, November 8, 2010
- 1 -
- LIAISON REPORTS
- FINANCIAL REPORTS September Report; Approval of the Preliminary 2011 Budget
- GOALS October Report
- OLD BUSINESS
- NEW BUSINESS Gawthrop Greenwood, 2011 Fees for Legal Services; Brickhouse Environmental Extension Request; Maillie, Falconiero & Co. Audit 2010 contract; Maillie, Falconiero & Co. Audit expenses for 2008/2009; Approval to purchase a Fit Chain
- CAPACITY REQUESTS None
- SEWER REPORTS Director of Public Works Report – September 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - 2010; Artesian Ridley Creek Report –2010
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| November 10, 2010 | January 1, 2011 |
| February 20, 2011 | |
| May 12, 2011 | |
| August 11, 2011 | |
| November 10, 2011 |
Monday, November 8, 2010
- 2 -
2. RIDLEY CREEK REPORTS
d.
5 pgs
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: November 5, 2011
To: Municipal Authority
From: Rick Smith, Township Manager
Re: Worth Change Orders
Below are some outstanding change orders and our recommendations.
March 26, 2010 – Extension due to problem with Siemens
Recommendation – Deny since Seimens is their subcontractor.
March 26, 2010 – Extension due to Clinger
Recommendation – Deny since they have remedies under the contract.
PCO 11 – Gate in SBR Railing – We asked them to provide an additional gate in the railing. Still researching this issue. We will have info at the meetings.
PCO 12 – Additional steel bean in SBR Building - $4,703.27
PCO 13 – Control Joint Modification in Screen Building - $4,499.12
Recommendation – Both of these are caused by conflicts between the structural and architected plan. Worth did incur the expense and he should be compensated for them. We would suggest approving and back charging Pennoni for one half of the cost.
PCO 14 – Additional gate in the fence – We asked them to provide an additional gate. Still researching this issue. We will have info at the meetings
PCO 18 – Panic hardware - $948.37
Recommendation – Approve if hardware was not included the hardware package listed in the specs.
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Change Orders\Memo to MA 110510.doc
2 of 5
Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com
March 26, 2010
Mr. Louis F. Smith Township Manger
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re.: Ridley Creek Sewage Treatment Plant Upgrade & Expansion
Pennoni Project# EGMA 0707
Dear Mr. Smith,
Due to the incorrect material supplied by Siemens Water Technologies, the new SBR wet test has been delayed 22 days. This delay will affect the commissioning and substantial completion for phase 1. This delay is not within the control of Worth and Company. Per the contract document Worth and Company request an extension of the contract time for the lost time. Please issue a change order for 22 days to the above referenced contract.
Please issue a change order for this as soon as possible.
If you should have any questions or require additional information please do not hesitate to contact me.
Sincerely,
[Signature]
Jeffrey Bush
Project Manager
Cc: File
Fred Papiernik, Worth and Company
Frank Ciufo, Pennoni
Evan Andrews PE
Scott Towler PE
3 of 5
Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com
March 26, 2010
Louis F. Smith Township Manger
East Goshen Township
1580 Paoli Pike, West Chester, PA 19380
Re.: Ridley Creek Sewage Treatment Plant Upgrade and Expansion
Pennoni Project # EGMA 0707
Dear Mr. Smith,
I would like to take exception to the charges for the extension of time East Goshen Township would like Worth and Company, Inc. to accept. Worth and Company, Inc. is entitled to an extension of time under the provision of the contract documents. The new permanent power from PECO that was to be coordinated by the electrical contractor and paid for by the owner was not installed until February 19, 2009. Originally it was to be completed by mid December 2009. This would have allowed ample time to complete phase 2 within the contract time. The lack of PECO power is not by fault of Worth and Company, Inc. and does not justified the charges to be levied. Worth and Company, Inc. request an extension of time for 65 days representing time lost to the lack of PECO power. Please issue the change order for the requested day.
Please issue a change order for this as soon as possible.
If you should have any questions or require additional information, please do not hesitate to contact me.
Sincerely,
[Signature]
Jeffrey Bush
Project Manager
Cc: File
Fred Pepiernik, Worth and Company
Frank Ciufo, Pennoni
Evan Andrews PE
Scott Towler PE
4 of 5
Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com
February 15, 2010
Mr. Evan Andrews
Pennoni
One Drexel Plaza
3001 Market Street
Philadelphia, PA 19104
Re.: Ridley Creek Sewage Treatment Plant Upgrade & Expansion
Pennoni Project# EGMA 0707
Dear Mr. Andrews,
When the project schedule was “reset” in October 2009, the new schedule was based on (a) new power service in December 2009 and (b) completion of equipment and SBR start-up in March 2010. The result was an estimated project substantial completion date of June 30 2010.
With the recent conclusion that new permanent power will not be completed until February 2010 and the new SBR plant will not be ready for full operation until late April 2010, an estimated substantial completion date of June 30, 2010 is no longer realistic. Given these facts, Worth and Company estimates that the project’s substantial completion dates will be September 30, 2010 assuming that the new power service is completed by February 22, 2010. The revise project schedule is attached. As always, we will try to improve on this schedule as the work progresses through the spring.
This project has been a challenge for all parties involved, including Worth and Company Inc. In recognition of the challenges, we request that the project substantial completion date be revised to September 30, 2010 (assuming new power service by February 22, 2010) without penalty.
Worth and Company reserves the right to assess the impact at a later date and to submit a time extension for the project as it becomes known.
If you should have any questions or require additional information please do not hesitate to contact me.
Sincerely,
[Signature]
Jeffrey Bush
Project Manager
5 of 5
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
March 22, 2010
Jeffrey Bush, Project Manager
Worth & Company, Inc.
6263 Kellers Church Road
Pipersville, PA 18947
Re: Ridley Creek Sewage Treatment Plant Upgrade and Expansion
Dear Jeff:
At their meeting on March 8, 2010 the Authority discussed your request to extend the date for substantial completion until September 30, 2010. It was the consensus of the Authority that in as much as the revised substantial completion date of June 30, 2010 was selected by Worth that Worth would be obligated to reimburse the Authority for any costs incurred by the Authority from that date until substantial completion.
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[Signature]
Louis F. Smith, Jr.
Township Manager
Cc: Municipal Authority
Evan Andrews, PE
Scott Towler, PE
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\General Mechanical\Letter to Worth re 2nd extension 032210.doc
3. RIDLEY CREEK INV
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | West Chester, PA 19381-0562
(p) 610-696-8225 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
09/30/2010
Client No: 6604-08M
Invoice No. 82932
Ridley Creek Treatment Plant Upgrade/Expansion;
Fees
| 09/08/2010 | Preparation for and attend meeting with client. | |
|---|---|---|
| 09/20/2010 | Review of correspondence from client; preparation of meeting. | |
| 09/22/2010 | Attend meeting with client. | |
| 09/30/2010 | Preparation for and attend meeting. | |
| For Current Services Rendered | 1,242.50 | |
| Previous Balance | $1,310.00 | |
| Total Current Charges | 1,242.50 | |
| 09/20/2010 | Cost Expense Payment | -15.00 |
| 09/20/2010 | Fee Payment | -1,295.00 |
| Total Payments | -1,310.00 | |
| Balance Due | $1,242.50 | |
[Handwritten note: ok per RC 11-1-10]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Steel
O’Rourke and Sons, Inc.
992 S Bolmar Street
West Chester PA 19382
| Invoice | 164372 |
|---|---|
| Date | 10/7/2010 |
| Page | 1 |
| Order No# |
Bill To:
East Goshen Township
1580 Paoli Pike
WEST CHESTER PA 19380
Ship To:
Lot No#
Delivery Date: 10/7/2010
East Goshen Township
customer p/u
| Salesperson ID | Payment Terms | Customer ID | Shipping Method | Req Ship Date |
|---|---|---|---|---|
| Net 30 Days | 2796 | YARD PICKUP | 10/7/2010 |
| Ordered | Shipped | Description | Unit Price | Ext. Price |
|---|---|---|---|---|
| 1.00 | 1.00 | FABRICATE STAINLESS | $665.00 | $665.00 |
| 1.00 | 1.00 | STEEL CONDENSER | $0.00 | $0.00 |
| 1.00 | 1.00 | FRAME. | $0.00 | $0.00 |
[Stamp: APPROVED BY: [initialed: MRD] | DATE PAID: | CHECK#: | CHARGED TO: 05422 3730 07424 - 7454 | A/c unit]
[Handwritten: ok RS 11/1 | RC]
| Subtotal | $665.00 |
|---|---|
| Misc | $0.00 |
| Tax | $0.00 |
| Freight | $0.00 |
| Trade Discount | $0.00 |
| Total | $665.00 |
O’ROURKE & SONS INC.
992 S. Bolmar Street
WEST CHESTER, PENNSYLVANIA 19382
(610) 436-0932
Fax (610) 344-0337
INVOICE 164372
TO: EAST GOSHEN TOWNSHIP
DATE: 9/2/2010
ORDER NO.:
SHIP TO: STEVE WALKER 610-656-8715
| SALESPERSON | DATE SHIPPED | SHIPPED VIA | F.O.B. POINT | TERMS |
|---|---|---|---|---|
| CUST P/U 9/13/10 | All material to be erected in accordance with A.I.S.C. Code. | Net 30 Days. 1½% Per Month Service Charge. |
| QUANTITY | DESCRIPTION | UNIT PRICE | TOTAL |
|---|---|---|---|
| 2 | FABRICATE STAINLESS STEEL AC CONDENSER FRAME |
[Signature]
Thank You!
[Handwritten: Rick]
invoice
CHARLES BLOSENSKI DISPOSAL CO.
265 Lippitt Road
HONEY BROOK, PA 19344
www.charlesblosenski.com
(610) 942-2480
| DATE | 10/18/2010 |
|---|---|
| ACCOUNT NUMBER | PURCHASE |
[Handwritten: RC]
EAST GOSHEN TOWNSHIP BUILDING
1580 PAOLI PIKE
WEST CHESTER, PA 19380
TERMS: DUE UPON RECEIPT
AMOUNT ENCLOSED $ ____________________
RETURN THIS PORTION WITH PAYMENT
| DATE | CHARGES AND CREDITS | AMOUNT |
|---|---|---|
| 9/27/2010 | PURCHASE A 20YD CONTAINER | $2,500.00 |
| FUEL SURCHARGE | $6.00 | |
| LINER | $25.00 | |
| BALANCE DUE UPON RECEIPT | $2,531.00 |
CHARLES BLOSENSKI DISPOSAL CO. 88688 Thank You
[Handwritten: ok RS 11/1]
CHARLES BLOSENSKI DISPOSAL CO.
COUNTRY DISPOSAL COMPANY
265 Lippitt Road
HONEY BROOK, PA 19344
(610) 942-2480 or (610) 942-3222
CUSTOMER’S ORDER NO.: PHONE: DATE: 10/17/10
NAME: East Goshen Twp.
ADDRESS:
SOLD BY: 697
| QTY. | DESCRIPTION | PRICE | AMOUNT |
|---|---|---|---|
|
Purchase 20yd sealed sludge container. Placed @ Waste Water Treatment facility 10/17/10 |
2500 00 | ||
|
[Stamp: APPROVED BY: _____ | DATE PAID: _____ | CHECK #: _____ | CHARGED TO: 07424- 7454 (with 54 written above 54)] [Handwritten: New Sludge Dumpster] |
|||
| TAX | |||
| TOTAL | 2500 00 | ||
OUR COMPANY WILL NOT ASSUME RESPONSIBILITY FOR DAMAGE TO CURB, DRIVEWAY OR YARD IF YOU REQUEST US TO DRIVE ON OR ACCESS THESE AREAS.
INVOICES TO BE PAID UPON RECEIPT OR A 33% COLLECTION CHARGE WILL APPLY.
RECEIVED BY: George Thompson
All claims and returned goods MUST be accompanied by this bill.
Thank You
NEBS To Reorder: 800-225-6380 or nebs.com
PowerPro EQUIPMENT - INVOICE
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
(717) 354-4241
FAX (717) 355-2466
820 EAST WASHINGTON STREET
WEST CHESTER, PA 19380
(610) 738-9000
FAX (610) 738-9003
6515 B MEMORIAL ROAD
ALLENTOWN, PA 18106
(610) 395-6499
FAX (610) 395-6692
** CREDIT MEMO ** ** COD - CASH/C
| DOCUMENT | INVOICE | CUSTOMER | DATE | PG |
|---|---|---|---|---|
| P32279 | 080067C | 10/13/10 | 1 |
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: 07427-2460 07424-7454
CREDIT
| SHIP VIA | BR | TRK | MAKE | MODEL | SERIAL NUMBER | F.O.B. | EQUIPMENT | HOURS/METER | SLSM | CUSTOMER P.O | DATE SHIPPED |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 02 | 57 | RIDLEY CREEK SP | 10/13/10 |
| ORDER | SHIP | B/O | MFR | PART NUMBER | DESCRIPTION | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| Telephone 610/692-7171 Taken By KS |
|||||||
| 4- | 4- | CS | 37306N0502 TOTAL PARTS |
DIAMOND PRO CORNER | 6.12 | 24.48- 24.48- |
|
| 7- | PALLET RETURN | 15.00 | 105.00- | ||||
| NON TAX - GOVT NT-GOVT |
.00 |
OK
RS
11-1
-=< THANK YOU FOR YOUR BUSINESS >=-
WWW.POWERPROEQUIPMENT.COM
CREDIT AMOUNT: 129.48-
TOTAL AMOUNT:
TERMS: A 1 1/2% PER MONTH LATE CHARGE IS ADDED TO THE UNPAID BALANCE ON ACCOUNTS PAST DUE PER TERMS REFERENCED ABOVE. THIS IS AN 18% ANNUAL PERCENTAGE RATE.
PAST DUE ACCOUNTS WILL BE REFERRED FOR COLLECTION AND CUSTOMER IS LIABLE FOR LEGAL COSTS.
ALL CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS INVOICE. THERE IS A 15% RESTOCKING CHARGE AFTER SEVEN (7) DAYS.
STORAGE CHARGE 30 DAYS AFTER NOTIFICATION.
REMIT TO:
POWER PRO NEW HOLLAND
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
We accept all major credit cards
WHITE - CUSTOMER COPY • PINK - REMITTANCE COPY • CANARY - FILE COPY
PowerPro EQUIPMENT - INVOICE
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
(717) 354-4241
FAX (717) 355-2466
820 EAST WASHINGTON STREET
WEST CHESTER, PA 19380
(610) 738-9000
FAX (610) 738-9003
6515 B MEMORIAL ROAD
ALLENTOWN, PA 18106
(610) 395-6499
FAX (610) 395-6692
** COD - CASH/C
| DOCUMENT | INVOICE | CUSTOMER | DATE | PG |
|---|---|---|---|---|
| P32136 | 080067C | 10/05/10 | 1 |
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
APPROVED BY: MB
DATE PAID:
CHECK #:
CHARGED TO: 01409-39-017 01437-2460 07424-7454
| SHIP VIA | BR | TRK | MAKE | MODEL | SERIAL NUMBER | F.O.B. | EQUIPMENT | HOURS/METER | SLSM | CUSTOMER P.O | DATE SHIPPED |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 02 | 57 | RIDLEY CREEK SP | 10/05/10 |
| ORDER | SHIP | B/O | MFR | PART NUMBER | DESCRIPTION | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| Telephone 610/692-7171 Taken By KS |
|||||||
| 280 | 280 | CS | 37304N0502 | DIAMOND PRO STRAIT | 6.00 | 1,680.00 | |
| 10 | 10 | CS | 37306N0502 | DIAMOND PRO CORNER | 7.65 | 76.50 | |
| 42 | 42 | CS | 37308N0502 TOTAL PARTS |
UNIV. LANDSCAPE CAP | 4.70 | 197.40 1,953.90 |
|
| 8 | PALLET CHARGE | 15.00 | 120.00 | ||||
| NON TAX - GOVT NT-GOVT |
.00 |
OK RS
11-1
-=< THANK YOU FOR YOUR BUSINESS >=-
WWW.POWERPROEQUIPMENT.COM
CREDIT AMOUNT:
TOTAL AMOUNT: 2,073.90
TERMS: A 1 1/2% PER MONTH LATE CHARGE IS ADDED TO THE UNPAID BALANCE ON ACCOUNTS PAST DUE PER TERMS REFERENCED ABOVE. THIS IS AN 18% ANNUAL PERCENTAGE RATE.
PAST DUE ACCOUNTS WILL BE REFERRED FOR COLLECTION AND CUSTOMER IS LIABLE FOR LEGAL COSTS.
ALL CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS INVOICE. THERE IS A 15% RESTOCKING CHARGE AFTER SEVEN (7) DAYS.
STORAGE CHARGE 30 DAYS AFTER NOTIFICATION.
REMIT TO:
POWER PRO NEW HOLLAND
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
We accept all major credit cards
WHITE - CUSTOMER COPY • PINK - REMITTANCE COPY • CANARY - FILE COPY
PowerPro EQUIPMENT - INVOICE
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
(717) 354-4241
FAX (717) 355-2466
820 EAST WASHINGTON STREET
WEST CHESTER, PA 19380
(610) 738-9000
FAX (610) 738-9003
6515 B MEMORIAL ROAD
ALLENTOWN, PA 18106
(610) 395-6499
FAX (610) 395-6692
** COD - CASH/C
| DOCUMENT | INVOICE | CUSTOMER | DATE | PG |
|---|---|---|---|---|
| P32515 | 080067C | 10/27/10 | 1 |
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
R.C
| SHIP VIA | BR | TRK | MAKE | MODEL | SERIAL NUMBER | F.O.B. | EQUIPMENT | HOURS/METER | SLSM | CUSTOMER P.O | DATE SHIPPED |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 02 | 57 | RIDLEY CREEK | 10/27/10 |
| ORDER | SHIP | B/O | MFR | PART NUMBER | DESCRIPTION | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| Telephone 610/692-7171 Taken By KS |
|||||||
| 5 | 5 | CS | 75132020 TOTAL PARTS |
1/2" REBAR 10FT | 3.50 | 17.50 17.50 |
|
| NON TAX - GOVT NT-GOVT |
.00 |
APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: 07424-7454
-=< THANK YOU FOR YOUR BUSINESS >=-
WWW.POWERPROEQUIPMENT.COM
CREDIT AMOUNT:
TOTAL AMOUNT: 17.50
TERMS: A 1 1/2% PER MONTH LATE CHARGE IS ADDED TO THE UNPAID BALANCE ON ACCOUNTS PAST DUE PER TERMS REFERENCED ABOVE. THIS IS AN 18% ANNUAL PERCENTAGE RATE.
PAST DUE ACCOUNTS WILL BE REFERRED FOR COLLECTION AND CUSTOMER IS LIABLE FOR LEGAL COSTS.
ALL CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS INVOICE. THERE IS A 15% RESTOCKING CHARGE AFTER SEVEN (7) DAYS.
STORAGE CHARGE 30 DAYS AFTER NOTIFICATION.
REMIT TO:
POWER PRO NEW HOLLAND
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
We accept all major credit cards
WHITE - CUSTOMER COPY • PINK - REMITTANCE COPY • CANARY - FILE COPY
Authorized Signature Date Pulled By Checked By
POWER PRO EQUIPMENT – W CHESTR
820 E WASHINGTON STREET
WEST CHESTER PA 19380
PHONE: 610/738-9000
FAX: 610/738-9003
PARTS ORDER
| Customer | 080067C |
|---|---|
| Document | P32515 |
| Pg | 1 |
| Date/Time | 10/26/10 9:13 |
| Terms | ** COD – CASH/CHECK ** |
Sold To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
Ship To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
| Br | Trk | Make | Model | Serial | Equipment | Meter | Sls | Customer P.O. |
|---|---|---|---|---|---|---|---|---|
| 002 | 57 | RIDLEY CREEK |
Taken By KS Ordered 10/26/10
| Ordr | Ship | B/O | Description | Each | Amount |
|---|---|---|---|---|---|
| 5 | 5 | CS 75132020 1/2″ REB CS7513* | 3.50 | 17.50 | |
| NON TAX – GOVT NT-GOVT |
.00 | ||||
[Stamp: APPROVED BY: [initialed: MRD] | DATE PAID: _____ | CHECK #: _____ | CHARGED TO: 07]
[Handwritten: Steps at Ridley]
[Signature: George Thompson]
<<<––– THANK YOU FOR YOUR BUSINESS
PLEASE LET US SERVE YOU AGAIN –––>>>
| Total | 17.50 |
|---|
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354-1300 • FAX (814) 766-0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE | Burkholder Paving | CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE
-- INVOICE --
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.
TERMS: NET 30 DAYS
INVOICE NUMBER: 302736
| INVOICE DATE | CUST. ACCT. NO. | CUST. JOB NO. | CUST. P.O. NO. | ZONE |
|---|---|---|---|---|
| 10/18/10 | 016716 001 | 7 |
JOB NAME: 2010 PRICING/STONE YARD
PLANT: 01 WEAVERLAND
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/14/10 | A053233 | 23.69 | TN | 12.410 | 2A 21.49 | 293.99 |
| 10/14/10 | A053234 | 22.88 | TN | 12.410 | 2A 20.76 | 283.94 |
[Stamp: APPROVED BY: _______ DATE PAID: _______ CHECK #: _______ CHARGED TO: 07424 7454]
[Handwritten: ok TLS 10/1]
| [X] TAX EXEMPT | TOTAL TONS: 46.57 | TOTAL SALE: 577.93 | TRUCK CHARGES: .00 | SALES TAX: .00 |
|---|---|---|---|---|
| TOTAL | 577.93 | |||
EAST GOSHEN TOWNSHIP
| ACCOUNT | DATE | INVOICE NO. | AMOUNT |
|---|---|---|---|
| 016716 001 | 10/18/10 | 302736 | 577.93 |
PAY BY: M160
MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 • Fax: (814) 766-0202
PLANT: 01 WEAVERLAND
Phone: 717-354-1370
| ORDER NO. | TICKET NUMBER | SCALE | AUTO/MANUAL | DATE | TIME |
|---|---|---|---|---|---|
| 1001040012 | 0101A053233 | 2 | A | 10/14/2010 | 07:02 AM |
|
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER: 016716 PHONE: 610-692-7171 PO: |
|---|---|
| SHIP TO: |
QUOTE: 1001040002 STATE: ZONE: 7 |
| PRODUCT ID | PRODUCT DESCRIPTION | EXTRA CHARGES |
|---|---|---|
| 11 - 421 | 2A |
[ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
JOB NAME / LOCATION: 2010 PRICING/STONE YARD WEST CHESTER
JOB: ITEM:
JOB REQUIRED NUMBERS:
| TAG NO. | AXLES | TRUCK | CARRIER NAME | CARRIER CODE |
|---|---|---|---|---|
| PA | 4 | RA20 | ARTERS TRUCKING | 525 |
| PICK-UP | FREIGHT PPD | FREIGHT COLLECT | PAYMENT METHOD |
|---|---|---|---|
| XX | BILLABLE |
| US WEIGHT | METRIC WEIGHT | ACCUMULATIVE QUANTITIES | CHARGES | AMOUNT | |
|---|---|---|---|---|---|
| 72,140 GROSS | ORDERED: 500.00 | MATERIAL | |||
| 24,760 TARE | TODAY: 23.69 | LOADS: 1 | HAUL | ||
| 47,380 NET | TO DATE: 312.07 | LOADS: 13 | ADD'L CHARGES | ||
| 23.69 TN | ACCUMULATED CASH SALE | TAX | |||
| WEIGHED BY: CYNTHIA M KOCHEL 016049 | TOTAL THIS LOAD | ||||
INSPECTOR'S SIGNATURE:
JOB ARRIVAL TIME:
JOB DEPARTURE TIME:
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [Signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 202 south, 3 east, at light at bottom of hill turn right on westtown way, look for twp stone yard on right. dump in appropriate bin. place tickets in mailbox. questions call mark 610-656-2742. or george 610-656-2743
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 07 424 7454]
[Handwritten: Paving Subgrade]
01-0101A053233 *
YOUR BUSINESS IS GREATLY APPRECIATED.
CUSTOMER'S COPY
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 • Fax: (814) 766-0202
PLANT: 01 WEAVERLAND
Phone: 717-354-1370
| ORDER NO. | TICKET NUMBER | SCALE | AUTO/MANUAL | DATE | TIME |
|---|---|---|---|---|---|
| 1001040012 | 0101A053234 | 1 | A | 10/14/2010 | 07:04 AM |
|
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER: 016716 PHONE: 610-692-7171 PO: |
|---|---|
| SHIP TO: |
QUOTE: 1001040002 STATE: ZONE: 7 |
| PRODUCT ID | PRODUCT DESCRIPTION | EXTRA CHARGES |
|---|---|---|
| 11 - 421 | 2A |
[ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
JOB NAME / LOCATION: 2010 PRICING/STONE YARD WEST CHESTER
JOB: ITEM:
JOB REQUIRED NUMBERS:
| TAG NO. | AXLES | TRUCK | CARRIER NAME | CARRIER CODE |
|---|---|---|---|---|
| NA | 4 | HH659 | HETTINGER TRUCKING | 659 |
| PICK-UP | FREIGHT PPD | FREIGHT COLLECT | PAYMENT METHOD |
|---|---|---|---|
| XX | BILLABLE |
| US WEIGHT | METRIC WEIGHT | ACCUMULATIVE QUANTITIES | CHARGES | AMOUNT | |
|---|---|---|---|---|---|
| 72,820 GROSS | ORDERED: 500.00 | MATERIAL | |||
| 27,060 TARE | TODAY: 46.57 | LOADS: 2 | HAUL | ||
| 45,760 NET | TO DATE: 334.95 | LOADS: 14 | ADD'L CHARGES | ||
| 22.88 TN | ACCUMULATED CASH SALE | TAX | |||
| WEIGHED BY: CYNTHIA M KOCHEL 016049 | TOTAL THIS LOAD | ||||
INSPECTOR'S SIGNATURE:
JOB ARRIVAL TIME:
JOB DEPARTURE TIME:
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [Signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 202 south, 3 east, at light at bottom of hill turn right on westtown way, look for twp stone yard on right. dump in appropriate bin. place tickets in mailbox. questions call mark 610-656-2742. or george 610-656-2743
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 07424 7440 7454]
01-0101A053234 *
YOUR BUSINESS IS GREATLY APPRECIATED.
CUSTOMER'S COPY
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354-1300 • FAX (814) 766-0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE | Burkholder Paving | CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE
-- INVOICE --
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.
TERMS: NET 30 DAYS
INVOICE NUMBER: 302737
| INVOICE DATE | CUST. ACCT. NO. | CUST. JOB NO. | CUST. P.O. NO. | ZONE |
|---|---|---|---|---|
| 10/18/10 | 016716 002 | 7 |
JOB NAME: 2010 PRICING/TWP BUILDING
PLANT: 01 WEAVERLAND
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/15/10 | A053352 | 23.88 | TN | 12.410 | 2A 21.66 | 296.35 RC [checkmark] |
| 10/15/10 | A053359 | 23.76 | TN | 12.410 | 2A 21.55 | 294.86 |
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 1454 7350 294.86]
[Handwritten: 1 Load To R/C plant (to paid by MA construction)]
[Handwritten: 1 Load to Line Rd For PATHWAY tk/tls]
| [X] TAX EXEMPT | TOTAL TONS: 47.64 | TOTAL SALE: 591.21 | TRUCK CHARGES: .00 | SALES TAX: .00 |
|---|---|---|---|---|
| TOTAL | 591.21 | |||
EAST GOSHEN TOWNSHIP
| ACCOUNT | DATE | INVOICENO. | AMOUNT |
|---|---|---|---|
| 016716 002 | 10/18/10 | 302737 | 591.21 |
PAY BY: M160
MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 • Fax: (814) 766-0202
PLANT: 01 WEAVERLAND
Phone: 717-354-1370
| ORDER NO. | TICKET NUMBER | SCALE | AUTO/MANUAL | DATE | TIME |
|---|---|---|---|---|---|
| 1001070010 | 0101A053352 | 1 | A | 10/15/2010 | 07:01 AM |
|
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER: 016716 PHONE: 610-692-7171 PO: |
|---|---|
| SHIP TO: |
QUOTE: 1001040002 STATE: ZONE: 7 |
| PRODUCT ID | PRODUCT DESCRIPTION | EXTRA CHARGES |
|---|---|---|
| 11 - 421 | 2A |
[ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
JOB NAME / LOCATION: 2010 PRICING/TWP BUILDING WEST CHESTER
JOB: ITEM:
JOB REQUIRED NUMBERS:
| TAG NO. | AXLES | TRUCK | CARRIER NAME | CARRIER CODE |
|---|---|---|---|---|
| PA | 4 | RA20 | ARTERS TRUCKING | 525 |
| PICK-UP | FREIGHT PPD | FREIGHT COLLECT | PAYMENT METHOD |
|---|---|---|---|
| XX | BILLABLE |
| US WEIGHT | METRIC WEIGHT | ACCUMULATIVE QUANTITIES | CHARGES | AMOUNT | |
|---|---|---|---|---|---|
| 72,520 GROSS | ORDERED: 500.00 | MATERIAL | |||
| 24,760 TARE | TODAY: 23.88 | LOADS: 1 | HAUL | ||
| 47,760 NET | TO DATE: 96.40 | LOADS: 4 | ADD'L CHARGES | ||
| 23.88 TN | ACCUMULATED CASH SALE | TAX | |||
| WEIGHED BY: CYNTHIA M KOCHEL 016049 | TOTAL THIS LOAD | ||||
INSPECTOR'S SIGNATURE:
JOB ARRIVAL TIME:
JOB DEPARTURE TIME:
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [Signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 100 south, 202 south to paoli pike exit, left on paoli pike, cross boot rd to twp bldg on right. **ASK FOR MARK-- 610-656-2742.****
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 07424-7454]
[Handwritten: Sub grade at Plant]
01-0101A053352 *
YOUR BUSINESS IS GREATLY APPRECIATED.
CUSTOMER'S COPY
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354-1300 • FAX (814) 766-0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE | Burkholder Paving | CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE
-- INVOICE --
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.
TERMS: NET 30 DAYS
INVOICE NUMBER: 302735
| INVOICE DATE | CUST. ACCT. NO. | CUST. JOB NO. | CUST. P.O. NO. | ZONE |
|---|---|---|---|---|
| 10/18/10 | 016716 | 7 |
JOB NAME: 1751 TOWN DRIVE
PLANT: 01 WEAVERLAND
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/15/10 | A053371 | 24.16 | TN | 12.410 | 2A 21.92 | 299.83 RC |
| 10/15/10 | A053386 | 24.19 | TN | 12.410 | 2A 21.94 | 300.20 |
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 01454-7350] [Handwritten arrow pointing to 300.20]
[Handwritten: Trail Line Rd.]
| [X] TAX EXEMPT | TOTAL TONS: 48.35 | TOTAL SALE: 600.03 | TRUCK CHARGES: .00 | SALES TAX: .00 |
|---|---|---|---|---|
| TOTAL | 600.03 300.20 | |||
EAST GOSHEN TOWNSHIP
| ACCOUNT | DATE | INVOICENO. | AMOUNT |
|---|---|---|---|
| 016716 | 10/18/10 | 302735 | 600.03 300.20 |
PAY BY: M160
MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 • Fax: (814) 766-0202
PLANT: 01 WEAVERLAND
Phone: 717-354-1370
| ORDER NO. | TICKET NUMBER | SCALE | AUTO/MANUAL | DATE | TIME |
|---|---|---|---|---|---|
| 1007160020 | 0101A053371 | 1 | A | 10/15/2010 | 09:43 AM |
|
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER: 016716 PHONE: 610-692-7171 PO: |
|---|---|
| SHIP TO: |
QUOTE: 1001040002 STATE: ZONE: 7 |
| PRODUCT ID | PRODUCT DESCRIPTION | EXTRA CHARGES |
|---|---|---|
| 11 - 421 | 2A |
[ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
JOB NAME / LOCATION: 1751 TOWN DRIVE WEST CHESTER
JOB: ITEM:
JOB REQUIRED NUMBERS:
| TAG NO. | AXLES | TRUCK | CARRIER NAME | CARRIER CODE |
|---|---|---|---|---|
| NA | 4 | MM689 | PAUL M. MARTIN TRUCKING, LLC | 689 |
| PICK-UP | FREIGHT PPD | FREIGHT COLLECT | PAYMENT METHOD |
|---|---|---|---|
| XX | BILLABLE |
| US WEIGHT | METRIC WEIGHT | ACCUMULATIVE QUANTITIES | CHARGES | AMOUNT | |
|---|---|---|---|---|---|
| 72,980 GROSS | ORDERED: 200.00 | MATERIAL | |||
| 24,660 TARE | TODAY: 24.16 | LOADS: 1 | HAUL | ||
| 48,320 NET | TO DATE: 121.36 | LOADS: 5 | ADD'L CHARGES | ||
| 24.16 TN | ACCUMULATED CASH SALE | TAX | |||
| WEIGHED BY: CYNTHIA M KOCHEL 016049 | TOTAL THIS LOAD | ||||
INSPECTOR'S SIGNATURE:
JOB ARRIVAL TIME:
JOB DEPARTURE TIME:
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [Signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left. *** Back In Drive *** mark 610-656-2742.
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 07424-]
[Handwritten: R/C Plant]
01-0101A053371 *
YOUR BUSINESS IS GREATLY APPRECIATED.
CUSTOMER'S COPY
Vimco - INVOICE
Vimco CONCRETE ACCESSORIES
Vimco FORMING SYSTEMS
Vimco MANUFACTURING
300 HANSEN ACCESS ROAD
KING OF PRUSSIA, PA 19406
TEL 610-768-0500
FAX 610-768-0586
CONCRETE ACCESSORIES AND FORMING EQUIPMENT... PLUS THE BEST SERVICE IN THE INDUSTRY TO OUR VALUED CUSTOMERS SINCE 1960!
50 1960-2010
300 HANSEN ACCESS ROAD • KING OF PRUSSIA, PA 19406 • 610-768-0500 • FAX: 610-768-0586
APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO:
RC
SOLD TO
EAST GOSHEN, TOWNSHIP OF
1580 PAOLI PIKE
WEST CHESTER PA 19380
SHIP TO
EAST GOSHEN, TOWNSHIP OF
1580 PAOLI PIKE
WEST CHESTER PA 19380
RENTAL#
| INVOICE DATE | INVOICE NO. | ORDERED DATE | CUSTOMER P.O. NO. | DELIVERY DATE | DELIVERY NO. | SHIPPED VIA | FREIGHT | CUST. NO. | JOB | SALES |
|---|---|---|---|---|---|---|---|---|---|---|
| 10/21/10 | 339422 | 10/20/10 | 10/20/10 | 280437 | PICK-UP | 34920 | 00 | 1007 |
| ITEM NUMBER | QUANTITY ORDERED | QUANTITY SHIPPED | UNIT | ITEM DESCRIPTION | UNIT PRICE | EXTENDED LIST | PERCENT | NET AMOUNT |
|---|---|---|---|---|---|---|---|---|
| RIDLEY | ||||||||
| 1TMCC848 | 1 | 1 | PC | CC188/2148 48" FINISH BROOM | 35.000 | 35.00 | 35.00 | |
| 1TKCF312 | 1 | 1 | PC | 9"X 4" & 3/4 -1/4R BRNZ EDG | 24.000 | 24.00 | 24.00 | |
| 1TKCC125 | 1 | 1 | PC | 10"X6"CH 1/2R WLKN EDG CC125 | 17.000 | 17.00 | 17.00 | |
| 1TKCC662 | 1 | 1 | PC | CC662 FREAZO ADAPTOR | 4.750 | 4.75 | 4.75 | |
| 1MLML105 | 2 | 2 | PL | L&M LUMISEAL WB 5GL | 95.000 | 190.00 | 190.00 |
OK RS
11/1
| PAYMENT TERMS | SERVICE CHARGE | TOTAL LIST | SUB TOTAL | STATE SALES TAX | PAY THIS AMOUNT |
|---|---|---|---|---|---|
| NET 30 DAYS | A SERVICE CHARGE OF 1 1/2% PER MONTH WILL BE APPLIED TO ALL ACCOUNTS 30 DAYS PAST DUE. | 270.75 | 270.75 | 270.75 |
SEE REVERSE SIDE FOR GENERAL TERMS AND CONDITIONS | ORIGINAL
Vimco - DELIVERY COPY
CONCRETE ACCESSORIES AND FORMING EQUIPMENT... PLUS THE BEST SERVICE IN THE INDUSTRY TO OUR VALUED CUSTOMERS SINCE 1960!
REMIT TO: 300 HANSEN ACCESS ROAD • KING OF PRUSSIA, PA 19406 • 610-768-0500 • FAX: 610-768-0586
SOLD TO
EAST GOSHEN TWP
SHIP TO
RIDLEY
| ORDERED DATE | CUSTOMER P.O. NO. | REQUESTED DATE | DELIVERY DATE | DELIVERY NO. | SHIP VIA OUR TRUCK UNLESS OTHERWISE NOTED | FREIGHT CHARGES | CUST. NO. | JOB | SALES | DESK |
|---|---|---|---|---|---|---|---|---|---|---|
| 10/20 | PU |
| ITEM NUMBER | QUANTITY ORDERED | QUANTITY SHIPPED | UNIT | ITEM DESCRIPTION |
|---|---|---|---|---|
| 1 | 1 | PC | 48" CEMENT FINISH BROOM | |
| 1 | 1 | PC | CF312 EDGER | |
| 1 | 1 | PC | CC125-01 EDGER | |
| 1 | 1 | PC | CC 662 ADAPTOR | |
| 2 | PL | L&M DRESS & SEAL WB LUMISEAL WB |
Michael R [illegible]
DELIVERY COPY | PLEASE SEE REVERSE SIDE FOR GENERAL TERMS AND CONDITIONS
APPROVED BY: MB
DATE PAID:
CHECK #:
CHARGED TO: RS 07424-7454
Ransome Rental Co., LP
THE CAT Rental STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
[Handwritten orange: R.C.]
INVOICE
Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 0]
|
SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
SHIP TO: CUSTOMER PICKUP IN WEST CHESTER **NO BUCKET |
|---|
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| K0312001 | 10-20-10 | 1268550 | 30 | R | 095 | 2 | 1 | |
| Agreement Number | Agreement Date | PC | LC | MC | Ship Via | Inv Seq No | ||
| K03120 | 10-15-10 | 10 | CPU IN PA LR | 361597 | ||||
| Make | Model | Serial Number | Equipment Number | Meter Reading | Mach Id No | |||
| AA | 420EHK | PRA00917 | 225.0 | CR30036 | ||||
CUSTOMER CONTACT: MARK MILLER
TAX EXEMPTION LICENSE GOVT/PA
| 1.0 |
EQUIPMENT RENTAL FROM 10/15/10 THRU 10/15/10 CATERPILLAR MODEL 420EHK 420E BACKHOE W/HAMMER KIT ID NO: CR30036 SERIAL NO: PRA00917 PIN: *CAT0420EHPRA00917* ATT: AA DF804004028 CATERPILLAR ID NO: CR80138 BUCKET ATT: AA 3887A CATERPILLAR ID NO: CR80775 BUCKET, 1.25 CYD GP ATT: AA 3889A CATERPILLAR ID NO: CR80777 QUICK COUPLER, PIN GRABBER, MAN. |
325.00 |
|---|---|---|
| 1.0 |
EQUIPMENT RENTAL FROM 10/15/10 THRU 10/15/10 CATERPILLAR MODEL H90-HAMMER RANSOME RENTS ATTACHMENTS ID NO: CR81001 SERIAL NO: 6TZ05529 |
275.00 |
| 1.0 | ENVIRO CHARGE | 8.00 |
| 1.0 | 095 |
RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).
| Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment. | PLEASE PAY THIS AMOUNT | 608.00 |
|---|---|---|
| AMOUNT CREDITED |
CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300
Ransome Rental Co., LP
THE CAT Rental STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
[Handwritten yellow/pencil: R.C.]
INVOICE
Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735
|
SOLD TO EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
SHIP TO CPU IN WEST CHESTER |
|---|
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| K0308701 | 10-25-10 | 1268550 | 30 | R | 095 | 2 | 1 | |
| Agreement Number | Agreement Date | PC | LC | MC | Ship Via | Inv Seq No | ||
| K03087 | 10-11-10 | 10 | CPU IN PA LR | 361774 | ||||
| Make | Model | Serial Number | Equipment Number | Meter Reading | Mach Id No | |||
| AA | D3GXL | JMH02478 | 361.0 | HR3002 | ||||
CUSTOMER CONTACT: MARK
TAX EXEMPTION LICENSE GOVT/PA
| 1.0 |
EQUIPMENT RENTAL FROM 10/11/10 THRU 10/25/10 CATERPILLAR MODEL D3GXL TRK TYPE TRACTOR ID NO: HR3002 SERIAL NO: JMH02478 PIN: *CAT00D3GCJMH02478* |
1976.00 |
|---|---|---|
| 1.0 | CLEANING CHARGE | |
| 1.0 | ENVIRO CHARGE | 8.00 |
| 1.0 | CUST |
RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).
[Stamp: APPROVED BY: _______ DATE PAID: _______ CHECK #: _______ CHARGED TO: 07424 7454]
| Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment. | PLEASE PAY THIS AMOUNT | 1984.00 |
|---|---|---|
| AMOUNT CREDITED |
CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300
Ransome Rental Co., LP
RENTAL AGREEMENT
THE CAT Rental STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
|
Lessee Bill To EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
Ship To CPU IN WEST CHESTER |
|---|
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| 10/11/10 | 1268550 | 30 | R | 095 | 2 | 1 | ||
| Agreement Number | Agreement Date | PC | LC | MC | Ship Via | Inv Seq No | ||
| K03087 | 10/11/10 | 10 | CPU IN PA | |||||
| Make | Model | Serial Number | Equipment Number | Meter Reading | Mach Id No | |||
| AA | D3GXL | 0JMH02478 | 360.0 | HR3002 | ||||
CUSTOMER CONTACT: MARK PHONE: 610 692 7171
| ITEM | QTY | RENTAL RATE | PERIOD | MKT VAL |
|---|---|---|---|---|
|
IDNO: HR3002 MODEL: D3GXL SERIAL NUMBER: 0JMH02478 PIN: *CAT00D3GCJMH02478* DESC: TRK TYPE TRACTOR TIME OUT: 11:00 DATE OUT: 10/11/10 METER OUT: 360.0 |
1.0 |
4 WEEK WEEK DAY |
70,000.00 |
EXPECTED RETURN DATE: 10/18/10
SHIP VIA: CPU IN PA
MISCELLANEOUS CHARGES
CLEANING CHARGE 1 40.00
ENVIRO CHARGE 1 8.00
CUST 1 .00
RE-FUEL CHARGE PER GALLON $6.00
NON-RETURNED KEY CHARGE $10.00
****PLEASE READ ALL OPERATOR SAFETY MANUALS****
PLEASE CALL TO RELEASE EQUIPMENT WHEN FINISHED
TOLL FREE 1-888-438-RENT (7368)
DAY=8 HOURS, WEEK=40 HOURS, 4 WEEK=160 HOURS
CLEANING CHARGE: NONE _____ STANDARD _____ HEAVY _____
[Stamp: APPROVED BY: [Signature] DATE PAID: _______ CHECK #: _______ CHARGED TO: 07424-]
[Handwritten: Prep sub grade]
| Delivery Date | Time | Pick Up Date | Time | ||
|---|---|---|---|---|---|
| Delivery Condition | Return Condition | ||||
| Hour Meter | Fuel Out | Hour Meter | Fuel In | ||
| Sheet Metal | Sheet Metal | ||||
| Tires | Tires | ||||
| Attach/Misc. | Attach/Misc. | ||||
| Accepted & Received By Renter | Date | Customer Return Signature | Date | ||
| Please Print Name | |||||
SEE TERMS ON BACK
RENTERS/LESSEE RESPONSIBILITIES: Renter/Lessee must check & maintain all fluid levels and lubricating points (engine oil, water, hydraulic oil, fuel, battery, greasing pins, etc.) DAILY. TIRE DAMAGE: Excessive wear, tire repair, and any damage to rented machine are renter's responsibility. Machine to be returned in reasonable clean condition. Minimum cleaning charge of $100 will be assessed if returned dirty. Renter will be charged for refueling. Daily inspect unit for damage, leaks, ets. and report problems immediately to Ransome Rents. The equipment described above has been received in good repair and operating condition.
FIRE/THEFT/VANDALISM
FTV (FIRE/THEFT/VANDALISM WAIVER) will be charged at 14% of the rental amount. This damage waiver covers theft, fire and vandalism only. You remain responsible for physical damage or injury. Fire/Theft/Vandalism waiver (FTV) is not insurance.
** Not available on Heavy Equipment Rentals. **
Ransome Rental Co., LP offers training on all rental equipment. [ ] TRAINING DECLINED (Please Initial)
CUSTOMER DELIVERY
Yerkes
Yerkes Associates, Inc. • Consulting Engineers / Site Planners / Land Surveyors
October 5, 2010
East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pennsylvania 19380
[Stamp: RECEIVED BY: _______]
Billings for the Month of September 2010
| Project Number | Invoice No. | Job Name | Amount |
|---|---|---|---|
| W2798-003 | 38542 | GIS | $ 1,040.75 [Handwritten: 1408 3130] |
| W3377-008 | 38543 | Applebrook Carriage Home Pulte | 180.00 [Handwritten: RC26] |
| W4278-014 | 38547 | Ridley Creek Treatment Plant | 571.88 |
| W4503-008 | 38625 | National Bank of Malvern | 220.00 [Handwritten: RC216] |
| W4503-009 | 38626 | Milltown Dam Inundation Map | 330.00 [Handwritten: 1413 3130] |
| W4755-001 | 38566 | General | 182.00 [Handwritten: 1408 3130] |
| W4755-007 | 38668 | 734 N. Chester Road | 1,155.00 [Handwritten: RC227] |
| W4755-006 | 38667 | Hankin - New Kent Apt. - LD | 2,145.00 [Handwritten: RC83] |
| TOTAL DUE | $5,824.63 | ||
[Handwritten bracket around W4278-014 through W4755-006, with note: RCSTP EXPENSE CONSTRUCTION ACCOUNT]
Please send copy of attached letter along with payments.
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
Yerkes
Yerkes Associates, Inc. - Consulting Engineers / Surveyors
Invoice
| Invoice number | 38547 |
|---|---|
| Date | October 05, 2010 |
EAST GOSHEN TOWNSHIP 2008
Board of Supervisors
1580 Paoli Pike
West Chester, PA 19380
Contract: W-08-4278 East Goshen Township 2008
PROFESSIONAL SERVICES RENDERED:
014 Ridley Creek Treatment Plant
Labor
| Date | Hours/Units | Rate | Amount |
|---|---|---|---|
| Michael Barbieri 9/20/2010 Download field work |
0.25 | 127.50 | 31.88 |
| Survey Crew 9/20/2010 FD - Stake east side of access leg |
4.00 | 135.00 | 540.00 |
| Labor subtotal | 4.25 | 571.88 | |
| Phase Subtotal | 571.88 | ||
| Invoice total | $571.88 |
Invoices Due On Receipt
REMIT TO ADDRESS:
YERKES ASSOCIATES, INC.
P.O. BOX 1568
WEST CHESTER, PA 19380-0078
Page 1 of 1
October 8, 2010
East Goshen Township
Invoice: 38547
Contract W-08-4278-14
Site: Ridley Creek Treatment Plant
| Mike Barbieri 9/20/2010 |
Prepare and download field work for field crew | 0.25 Hrs |
|---|---|---|
| Survey Crew 9/20/2010 |
Set stakes along east side of access leg for treatment plant. | 4.00 Hrs. |
[Signature: Michael Barbieri]
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
|
East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice #: 454783 Invoice Date: 10/27/2010 Project: EGMA0707 Project Name: RCSTP Expansion |
|---|
For Services Rendered through: 10/17/2010
Construction and coordination meetings with contractors and Township; construction management; O&M submittal review; punchlist development and progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss substantial completion with contractors, and review of substantial completion requests.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Permit Design | est. $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. $192,320.00 | $171,224.42 | $183,550.57 | $12,326.15 | |
| Total : | $715,320.00 | $694,090.22 | $706,416.37 | $12,326.15 |
| Amount Due This Invoice | $12,326.15 |
|---|
[Handwritten: ok Mark S Miller 10/28/2010]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls
Invoice Date 10-27-2010
| Project: | RCSTP Expansion and Upgrade | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA0707 | |||
| Invoice No: | 454783 | |||
| Invoice Period: | 9/20/2010 | to | 10/17/2010 | |
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 | |
| Changes: | $ - | Date: | 2/5/2009 | |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 | |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 | |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 | |
| Changes: | $ 11,500.00 | Date: | 6/14/2010 | |
| Changes: | $ 40,400.00 | Date: | 8/5/2010 | |
| Changes: | $ 18,720.00 | Date: | 10/11/2010 | |
| Contract Amount: | $ 715,320.00 | |||
| Previously Invoiced: | $ 694,090.22 | |||
| Current Invoice: | $ 12,326.15 | |||
| Invoiced to Date ($): | $ 706,416.37 | |||
| Invoiced to Date (%): | 99% | |||
| Remaining Budget ($): | $ 8,903.63 | |||
| Remaining Budget (%): | 1.24% | |||
Budget by Phase:
| Phase No. | 10 |
|---|---|
| Phase Name: | Continued Eng Svcs |
| Phase Budget: | $ 99,700.00 |
| Changes: | $ 33,500.00 |
| Changes: | $ 40,400.00 |
| Changes: | $ 18,720.00 |
| Contract Amount: | $ 192,320.00 |
| Previously Invoiced: | $ 171,224.42 |
| Current Invoice: | $ 12,326.15 |
| Invoiced to Date ($): | $ 183,550.57 |
| Invoiced to Date (%): | 95% |
| Remaining Budget ($): | $ 8,769.43 |
| Remaining Budget (%): | 9% |
Comments: Phase 10 - Continued Engineering Services
Construction and coordination meetings with contractors and Township; construction management; O&M submittal review; punchlist development and progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss substantial completion with contractors, and review of substantial completion requests.
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 185.75 | 21.50 | 207.25 |
| Senior Engineer | 373.25 | 22.00 | 395.25 |
| Senior Designer | 169.00 | 28.00 | 197.00 |
| Project Engineer | 151.00 | 13.50 | 164.50 |
| Staff Engineer | 12.25 | 0.00 | 12.25 |
| Associate Engineer | 69.00 | 0.00 | 69.00 |
| Graduate Engineer | 43.75 | 0.00 | 43.75 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 963.75 | 55.00 | 1018.75 |
| Engineering Technician I | 49.00 | 0.50 | 49.50 |
| Administrative Assistant I | 0.50 | 1.00 | 1.50 |
| Totals | 2019.75 | 141.50 | 2161.25 |
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
|
East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice #: 454693 Invoice Date: 10/27/2010 Project: EGMA0903 Project Name: RCSTP Sewer Modeling |
|---|
For Services Rendered through: 10/17/2010
Finalize and submit semi-annual report to DEP as required by the CO&A. Consultation with Township.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,620.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,620.00 | |
| Amount Due This Invoice | $1,620.00 | |
| Fee : | 30,670.00 |
|---|---|
| Prior Billings : | 28,789.00 |
| Current Billings : | 1,620.00 |
| Total Billings : | 30,409.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Project Engineer | 18.00 | 90.00 | 1,620.00 |
| Labor Total: | 18.00 | 1,620.00 |
| Total Phase : **** -- Professional Services | Labor : | $1,620.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project: EGMA0903 -- RCSTP Sewer Modeling | Labor : | $1,620.00 |
| Expense : | $0.00 |
[Handwritten: ok Mark S Miller]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0903 Invoice Summary.xls
Invoice Date 10-27-2010
| Project: | RCSTP Sewer Modeling | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA 0903 | |||
| Invoice No: | 454693 | |||
| Invoice Period: | 9/20/2010 | to | 10/17/2010 | |
| Initial Authorization: | $ 28,300.00 | Date: | 9/17/2009 | |
| Changes: | $ 2,370.00 | Date: | 9/15/2010 | |
| Contract Amount: | $ 30,670.00 | |||
| Previously Invoiced: | $ 28,789.00 | |||
| Current Invoice: | $ 1,620.00 | |||
| Invoiced to Date ($): | $ 30,409.00 | |||
| Invoiced to Date (%): | 99% | |||
| Remaining Budget ($): | $ 261.00 | |||
| Remaining Budget (%): | 1% | |||
Budget by Phase:
| Phase No. | |
|---|---|
| Phase Name: | RCSTP Sewer Modeling |
| Phase Budget: | $ 30,670.00 |
| Previously Invoiced: | $ 28,789.00 |
| Current Invoice: | $ 1,620.00 |
| Invoiced to Date ($): | $ 30,409.00 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 261.00 |
| Remaining Budget (%): | 1% |
Comments: Finalize and submit semi-annual report to DEP as required by the CO&A. Consultation with Township.
Brickhouse Environmental
Consultants and Engineers
|
East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380 |
Invoice number: 5596 Date: 11/1/2010 Client ID: 548 |
|---|
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/CLINGER
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of October 2010.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 4.50 | 517.50 |
| Labor Total | 4.50 | 517.50 |
| Invoice Total | 517.50 |
[Handwritten: TLS 11-4]
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com
When Creativity & Experience Count
Brickhouse Environmental
Project Accomplishments
B E Project No. 09-2532-1
East Goshen / Ridley Creek Sewage Treatment Plant / Clinger
October 2010
The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project regarding Clinger matters:
- 10-7-10 Review and evaluate information regarding claim for additional fees.
- 10-8-10 Gather information and update documents provided by Stephen McDonnell, Esq., for the 10-11-10 Authority Board Meeting.
- 10-11-10 Update Clinger certified payroll spreadsheet.
NOTE:
- From April through August 2010, Brickhouse spent 36.5 hours on special Clinger issues initially presented in their March 15, 2010 letter. These hours were out of the scope of Brickhouse's original Project Management contract. However, they were invoiced to and paid by the Authority under the original contract (Task # 0). During September 2010, Brickhouse attributed 59 hours to the out of scope Clinger issues under Task # 1, newly created to track the out of scope special Clinger issues hours.
- In October 2010, Brickhouse spent 4.5 hours on out of original scope special Clinger issues under Task #1.
- Therefore, the total hours available for Project Management in the original contract budget were reduced by: the 36.5 hours (April through August 2010 Task # 0); the 59 hours (September 2010, Task #1); plus, the 4.5 hours (October 2010, Task #1) for a combined total of 100 hours.
J:\092532.1\Clinger\October 2010 Bullets.doc
Ridley Creek Wastewater Treatment Plant Upgrade
October 2010
Project Manager: Scott A. Towler
| Date | Description | Hours | Hours to Date |
|---|---|---|---|
| Billing Rate | $ 95.00 | ||
| 7-Oct-10 | Work on reviewing information regarding the Wm. H. Clinger's claim for additional fees. | 1.00 | 1.00 |
| 8-Oct-10 | Gather information and update documents provide by Stephen McDonnell for Monday's Authroity meeting. | 2.00 | 3.00 |
| 11-Oct-10 | Update Clinger certified payroll spreadsheet. | 1.50 | 4.50 |
| September 2010 Hours | 4.50 | ||
Brickhouse Environmental
Consultants and Engineers
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Invoice number: 5595
Date: 11/1/2010
Client ID: 548
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of October 2010.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 76.75 | 8,826.25 |
| Labor Total | 76.75 | 8,826.25 |
| Reimbursable | Amount |
|---|---|
| 0.00 | |
| Expense Total | 0.00 |
| Invoice Total | 8,826.25 |
11-4-10
RS
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
When Creativity & Experience Count
www.brickhouse-environmental.com
Brickhouse Environmental
Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
October 2010
The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:
- 10-1-10 Site visit re: effects of 8" precipitation in prior 24 hours. Recorded observations for modifying control panel for disc filter feed pumps and UV disinfection.
- 10-4-10 Site visit to review plant operation and conditions in prep for Allied Control Systems and Mid Atlantic Pump scheduled for 10-5-10.
- 10-5-10 Site visit to attend control panel programming modification for: disc filter feed; UV disinfection; SHT telescoping valves; and, influent flow meter troubleshooting. Started sludge dewatering system in prep for polymer system rep visit scheduled for 10-6-10.
- 10-6-10 Site visit to attend finalization of control panel programming modifications. Coordinated w/ Watson Marlow pump reps in operation of alum & soda ash feeds. Coordinated operation of sludge dewatering polymer system w/ equipment rep during centrifuge operation.
- 10-7-10 Site visit observation of Pennoni preparing punch list items for Clinger (electrical contractor) completion, Township resetting inlet at treatment building's east side and Worth grading access driveway at Basin #1.
- 10-7-10 Prepared Project Manager's report for September activities.
- 10-8-10 Site visit observation of Pennoni preparing punch list items for Worth (general contractor) completion.
- 10-8-10 telephone call from Clinger's Bob Dina re: "Electrical Coordination Study" and follow up email to Pennoni's Dan Barbato. Finalize and distribute PM's report.
- 10-11-10 Emails to S. McDonnell, D. Barbato & D. Evans.
- 10-11-10 Site visit observation of Basin #1 nearing completion, ProMax (fencing installer) on site.
- 10-11-10 Prepared for and attend Authority's monthly Board Meeting. Included lengthy Executive Session presentation and dialogue with Steve McDonnell, Esq.
Brickhouse Environmental
- 10-12-10 Received telephone call from Bob Dina, responded to emails and reviewed draft punch lists.
- 10-13-10 Site visit to review general and mechanical draft punch lists w: Matt McAloon; Tom Horrex; and, Worth's Dwayne. Met w/ CET Polymer's Kevin Jacoby. Revised and distributed punch list.
- 10-14-10 Update spreadsheet for Worth & Co. Proposed Change Order (PCO) and approved Change Orders.
- 10-15-10 Site visit to review progress towards punch list item completion.
- 10-15-10 Contacts with Jack Yahraes and Joe McCawley re: Brickhouse budget and out of scope tasks.
- 10-18-10 Coordination with Scott Towler on budget, out of scope tasks and punch list generations.
- 10-18-10 Emails to D. Barbato re: lab fees for Siemens performance testing.
- 10-22-10 Review Siemens performance warranty. Prepared required analytical test methods, frequencies, distribution request for RFQs to analytical labs.
- 10-26-10 Site visit observation of: Worth labeling piping (for identification of function and flow direction) in the Treatment and Control buildings; Township preparing stoned / graveled surface for paving, perimeter security fence posts and wire fabric installed (top barbed wire strands and gates not yet in place).
- 10-26-10 Received and reviewed certified laboratory price quote for performance / effluent quality testing.
- 10-27-10 Site visit to meet contractor and review: telescopic valve operation; auger alarm conditions; fine screen downstream transducer fault; and, final effluent flow reading on ADS panel.
- 10-28-10 Review and respond to questions re:,Siemens performance test. Project update w/ D. Barbato re: Siemens performance warranty.
- 10-28-10 Site visit observations of: stoned / graveled area surface ready for asphalt paving; soil surface areas north of Control Building and northwest of Screen Building not final graded; Worth working on check valve in Valve Pit (this appears to be the same check valve that originally had function issues); effluent automatic sampler moved from outdoor location at effluent box to inside Treatment Building location at UV disinfection outfall channel location.
Brickhouse Environmental
- 10-29-10 Site visit to review disc filter feed pumps operation and set points for the post effluent EQ basins and sludge holding tanks.
Notes:
- Brickhouse's project management involvement was originally anticipated to be completed week 67, ending August 8, 2010 at 1,522 hours.
- The duration of Brickhouse's involvement was extended, without need to increase the total contract hours or value to due to Brickhouse being under the original budget. This extension was to week 76, ending October 10, 2010 and attendance at the October 11, 2010 Monthly Authority Meeting.
- As explained at the October 11, 2010 Monthly Authority Meeting, Brickhouse had, at that time, expended the hours in the original budget.
- With the Board's approval, Brickhouse will continue to serve the Authority's needs as requested.
J:\092532.0\October 2010 Bullets.doc
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
The original budget estimate was adjusted from 67 weeks for a cumulative $175,030 (at $115/hour) to 76 weeks for the same cumulative $175,030 (at $115/hour) in order to reflect actual total as of September 30, 2010 as a new baseline.
| Week Ending | Projected Totals | Actual Totals | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | ||
| 30-Sep-10 | Week 75 | 1,489 | $171,282.50 | $17,480.00 | 1,489 | $171,282.50 | $17,480.00 | ||
| 3-Oct-10 | Week 75 (1 day) | 5 | 1,494 | $171,810.00 | 10 | ||||
| 10-Oct-10 | Week 76 | 28 | 1,522 | $175,030.00 | *SEE NOTES | 23 | 1,522 | $175,030.00 | *SEE NOTES |
*NOTES:
Brickhouse's contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours.
The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting, without increase in hours.
From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.
The original 1,522 hours were expended at week 76.
| Week Ending | Projected Totals | Actual Totals | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | Project Management | Cumulative Hours | Cumulative Fees | Monthly Fees | ||
| 17-Oct-10 | Week 77 | **SEE NOTE BELOW | SEE NOTES* | 19.75 | |||||
| 24-Oct-10 | Week 78 | 5.5 | |||||||
| 31-Oct-10 | Week 79 | 11 | 1,603.25 | $184,373.75 | 9343.75 | ||||
**NOTE:
With the Board's approval, Brickhouse Environmental will continue to serve the Authority's needs as requested.
J:\092532.0\Project Management\PM Schedule\Schedule_Revised.xls
Page 1 of 1
3. RIDLEY CREEK INV.
R
9 pgs
Application and Certificate For Payment
Page 1
| To Owner: East Goshen Municipal Authorit 1580 Paoli Pike West Chester, PA 19380 |
Project: Ridley Creek WWTP 1751 Towne Road Fred Papiernik 267-278-6108 West Chester, PA 19380 |
Application No: 23 Period To: 10/31/10 |
Date: 10/31/2010 |
|---|---|---|---|
| From (Contractor): Worth and Company, Inc. 6263 Kellers Church Road Pipersville, PA 18947 Phone: 267 362-1100 |
Contractor Job Number: P28001 Via (Architect): Contract For: |
Architect's Project No: Contract Date: 10/22/08 |
Contractor's Application For Payment
| Change Order Summary | Additions | Deductions |
|---|---|---|
| Change orders approved in previous months by owner | 46,672.59 | -42,648.25 |
| Change orders approved this month (Number / Date Approved) | ||
| Totals | ||
| Net change by change orders | 4,024.34 | |
| Original contract sum | 7,865,400.00 |
|---|---|
| Net change by change orders | 4,024.34 |
| Contract sum to date | 7,869,424.34 |
| Total completed and stored to date | 7,869,424.34 |
| Retainage | |
| 2.8% of completed work | 224,058.22 |
| 0.0% of stored material | 0.00 |
| Total retainage | 224,058.22 |
| Total earned less retainage | 7,645,366.12 |
| Less previous certificates of payment | 7,421,366.12 |
| Current payment due | 224,000.00 |
| Balance to finish, including retainage | 224,058.22 |
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief the work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
Contractor:
By: James G. [illegible] Date: 11/4/10
State of: PA
County of: Bucks
Subscribed and sworn to before me this 4th day of November, 2010 (year), Notary Public: Linda D. Nelson
My commission expires
COMMONWEALTH OF PENNSYLVANIA
Notarial Seal
Linda D. Nelson, Notary Public
Plumstead Twp., Bucks County
My Commission Expires Sept. 19, 2014
Member, Pennsylvania Association of Notaries
Architect's Certificate for Payment
In accordance with the Contract Documents, based on on-site observations and the data comprising the above application the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.
Amount Certified: $ 224,000.00
Architect:
By: [signature] Date: 11/5/2010
This Certification is not negotiable. The Amount Certified is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.
OK RS 11/5/10
2 of 9
Application and Certificate For Payment -- page 2
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed - Previous Application | Work Completed - This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| CO-001 | Blower Repairs | 3,209.70 | 3,209.70 | 0.00 | 0.00 | 3,209.70 | 100.00 | 0.00 | 91.39 | |
| CO-001A | Anit Flotation Collar | 2,703.00 | 2,703.00 | 0.00 | 0.00 | 2,703.00 | 100.00 | 0.00 | 76.96 | |
| CO-001B | Blower 2 repairs | 5,542.80 | 5,542.80 | 0.00 | 0.00 | 5,542.80 | 100.00 | 0.00 | 157.81 | |
| CO-001C | Top Entry Mixer change | 6,784.65 | 6,784.65 | 0.00 | 0.00 | 6,784.65 | 100.00 | 0.00 | 193.17 | |
| CO-001D | SBR Handrail | 4,494.52 | 4,494.52 | 0.00 | 0.00 | 4,494.52 | 100.00 | 0.00 | 127.97 | |
| CO-001E | Blower 3 Repairs | 4,617.08 | 4,617.08 | 0.00 | 0.00 | 4,617.08 | 100.00 | 0.00 | 131.46 | |
| CO-001F | Paving Credit | -50,000.00 | -50,000.00 | 0.00 | 0.00 | -50,000.00 | 100.00 | 0.00 | -1,423.60 | |
| CO-001G | SBR Wall Credit | -20,000.00 | -20,000.00 | 0.00 | 0.00 | -20,000.00 | 100.00 | 0.00 | -569.44 | |
| CO-002 | PVC Credit Lieu of Cast Iron | -6,250.00 | -6,250.00 | 0.00 | 0.00 | -6,250.00 | 100.00 | 0.00 | -177.95 | |
| CO-002A | Concrete Wall @ UV Channel | 11,357.25 | 11,357.25 | 0.00 | 0.00 | 11,357.25 | 100.00 | 0.00 | 323.36 | |
| CO-002B | Blower 4 Repairs | 6,126.78 | 6,126.78 | 0.00 | 0.00 | 6,126.78 | 100.00 | 0.00 | 174.44 | |
| CO-003 | (24) Air Drops | 27,702.20 | 27,702.20 | 0.00 | 0.00 | 27,702.20 | 100.00 | 0.00 | 788.74 | |
| CO-003A | New Doors | 3,516.77 | 3,516.77 | 0.00 | 0.00 | 3,516.77 | 100.00 | 0.00 | 100.13 | |
| CO-003B | Paint Digester Walkway | 18,094.59 | 18,094.59 | 0.00 | 0.00 | 18,094.59 | 100.00 | 0.00 | 515.19 | |
| CO-003C | Digester Concrete Credit | -13,875.00 | -13,875.00 | 0.00 | 0.00 | -13,875.00 | 100.00 | 0.00 | -395.05 | |
| Subtotal | 4,024.34 | 4,024.34 | 0.00 | 0.00 | 4,024.34 | 100.00 | 0.00 | 114.58 | ||
| G1-000 | Site Work & Yard Piping | |||||||||
| G1-001 | Bonds | 160,000.00 | 160,000.00 | 0.00 | 0.00 | 160,000.00 | 100.00 | 0.00 | 4,555.52 | |
| G1-002 | Insurance | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 1,423.60 | |
| G1-003 | Mobilization | 100,000.00 | 100,000.00 | 0.00 | 0.00 | 100,000.00 | 100.00 | 0.00 | 2,847.20 | |
| G1-004 | Pre-Planning/Schedule | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G1-005 | Submittals - Dutchland | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | |
| G1-006 | Submittals - Jet Tech | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | |
| G1-007 | E & S Controls | 25,000.00 | 22,500.00 | 2,500.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | |
| G1-008 | Strip Topsoil | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 1,423.60 | |
| G1-009 | Temporary Seed | 5,000.00 | 3,000.00 | 2,000.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 142.36 |
Application and Certificate For Payment -- page 3
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
309
| Item Number | Description | Scheduled Value | Work Completed | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo | |
|---|---|---|---|---|---|---|---|---|---|---|
| Previous Application | This Period | |||||||||
| G1-010 | Bioretention Basin 1 | 20,000.00 | 15,000.00 | 5,000.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G1-011 | Bioretention Basin 2 | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G1-012 | Temporary Fence | 9,000.00 | 8,550.00 | 450.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 256.25 | |
| G1-013 | Influent Force Main | 85,000.00 | 85,000.00 | 0.00 | 0.00 | 85,000.00 | 100.00 | 0.00 | 2,420.12 | |
| G1-014 | Filter Feed Force Main | 85,000.00 | 85,000.00 | 0.00 | 0.00 | 85,000.00 | 100.00 | 0.00 | 2,420.12 | |
| G1-015 | Filter Effluent | 55,000.00 | 55,000.00 | 0.00 | 0.00 | 55,000.00 | 100.00 | 0.00 | 1,565.96 | |
| G1-016 | System Effluent | 55,000.00 | 55,000.00 | 0.00 | 0.00 | 55,000.00 | 100.00 | 0.00 | 1,565.96 | |
| G1-017 | Filter Feed Pump Suction | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | |
| G1-018 | Filter Feed Pump Discharge | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 1,423.60 | |
| G1-019 | Flocculation Tank to Filters | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 1,281.24 | |
| G1-020 | 4" WAS | 70,000.0070,000.00 | 0.00 | 0.00 | 70,000.00 | 100.00 | 0.00 | 1,993.04 | ||
| G1-021 | Yard Drain | 25,000.0025,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | ||
| G1-022 | Sludge Pump Suction | 20,000.0020,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | ||
| G1-023 | Relocate Air Lines | 45,000.0045,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 1,281.24 | ||
| G1-024 | Influent | 75,000.0075,000.00 | 0.00 | 0.00 | 75,000.00 | 100.00 | 0.00 | 2,135.40 | ||
| G1-025 | Utility Water | 15,000.0015,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | ||
| G1-026 | Apple Brook Discharge | 25,000.0025,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | ||
| G1-027 | PVC Chemical Carrier Pipe | 45,000.0045,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 1,281.24 | ||
| G1-028 | Potable Water | 40,000.0040,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 1,138.88 | ||
| G1-029 | 8" Underdrain | 15,000.0015,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | ||
| G1-030 | 1" Compressed Air | 15,000.0015,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | ||
| G1-031 | Sidewalks | |||||||||
| G1-032 | VOID | |||||||||
| G1-033 | VOID | |||||||||
| G1-034 | Block | 1,000.00 | 1,000.00 | 0.00 | 0.00 | 1,000.00 | 100.00 | 0.00 | 28.47 | |
| G1-035 | Chain Link Fence | 30,000.00 | 0.00 | 30,000.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 854.16 | |
4 of 9
Application and Certificate For Payment -- page 4
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed - Previous Application | Work Completed - This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G1-036 | Demo Existing Fence | 10,000.00 | 5,000.00 | 5,000.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| Subtotal | 1,345,000.00 | 1,300,050.00 | 44,950.00 | 0.00 | 1,345,000.00 | 100.00 | 0.00 | 38,294.84 | ||
| G2-000 | Pump Station & Valve Vault | |||||||||
| G2-001 | Excavate Pump Station | 52,000.00 | 52,000.00 | 0.00 | 0.00 | 52,000.00 | 100.00 | 0.00 | 1,480.54 | |
| G2-002 | Install Precast Pump Station | 68,000.00 | 68,000.00 | 0.00 | 0.00 | 68,000.00 | 100.00 | 0.00 | 1,936.10 | |
| G2-003 | Install Anti-Flotation Collar | 3,500.00 | 3,500.00 | 0.00 | 0.00 | 3,500.00 | 100.00 | 0.00 | 99.65 | |
| G2-004 | Backfill Pump Station | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 341.66 | |
| G2-005 | Excavate Valve Vault | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | |
| G2-006 | Install Valve Vault | 28,000.00 | 28,000.00 | 0.00 | 0.00 | 28,000.00 | 100.00 | 0.00 | 797.22 | |
| G2-007 | Backfill Valve Vault | 7,500.00 | 7,500.00 | 0.00 | 0.00 | 7,500.00 | 100.00 | 0.00 | 213.54 | |
| G2-008 | Painting | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 256.25 | |
| G2-009 | Pipe/Valves/Fittings | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | |
| G2-010 | Influent Pumps | 65,000.00 | 65,000.00 | 0.00 | 0.00 | 65,000.00 | 100.00 | 0.00 | 1,850.68 | |
| Subtotal | 275,000.00 | 275,000.00 | 0.00 | 0.00 | 275,000.00 | 100.00 | 0.00 | 7,829.80 | ||
| G3-000 | Screen Building | |||||||||
| G3-001 | Excavate Screen Bldg; Elev 13' | 38,000.00 | 38,000.00 | 0.00 | 0.00 | 38,000.00 | 100.00 | 0.00 | 1,081.94 | |
| G3-002 | Stone Underslab | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 142.36 | |
| G3-003 | Form/Pour 18" Thick Slab | 39,000.00 | 39,000.00 | 0.00 | 0.00 | 39,000.00 | 100.00 | 0.00 | 1,110.41 | |
| G3-004 | Form/Pour Exterior Walls | 65,000.00 | 65,000.00 | 0.00 | 0.00 | 65,000.00 | 100.00 | 0.00 | 1,850.68 | |
| G3-005 | Backfill | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 341.66 | |
| G3-006 | Excavate Footers; Elev 2'8" | 7,000.00 | 7,000.00 | 0.00 | 0.00 | 7,000.00 | 100.00 | 0.00 | 199.30 | |
| G3-007 | Form/Pour Footers | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 341.66 | |
| G3-008 | Install Masonry Frost Wall | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 256.25 | |
| G3-009 | Pour Slab | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| G3-010 | Form/Pour Channel Walls | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 1,423.60 | |
| G3-011 | Install Exterior Masonry Walls | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 854.16 |
5 of 9
Application and Certificate For Payment -- page 5
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed - Previous Application | Work Completed - This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G3-012 | Structural Steel | 3,000.00 | 3,000.00 | 0.00 | 0.00 | 3,000.00 | 100.00 | 0.00 | 85.42 | |
| G3-013 | Misc Metals | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| G3-014 | Rough Carpentry | 24,000.00 | 24,000.00 | 0.00 | 0.00 | 24,000.00 | 100.00 | 0.00 | 683.33 | |
| G3-015 | Dryvit | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 512.50 | |
| G3-016 | FRP Grating | 4,000.00 | 4,000.00 | 0.00 | 0.00 | 4,000.00 | 100.00 | 0.00 | 113.89 | |
| G3-017 | Hollow Metal & FRP Doors | 1,500.00 | 1,500.00 | 0.00 | 0.00 | 1,500.00 | 100.00 | 0.00 | 42.71 | |
| G3-018 | Overhead Doors | 17,500.00 | 17,500.00 | 0.00 | 0.00 | 17,500.00 | 100.00 | 0.00 | 498.26 | |
| G3-019 | Trolley & Hoist | 2,000.00 | 2,000.00 | 0.00 | 0.00 | 2,000.00 | 100.00 | 0.00 | 56.94 | |
| G3-020 | Plumbing | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 142.36 | |
| G3-021 | HVAC | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| G3-022 | Painting | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 341.66 | |
| Subtotal | 380,000.00 | 380,000.00 | 0.00 | 0.00 | 380,000.00 | 100.00 | 0.00 | 10,819.37 | ||
| G4-000 | Grinder w/RotatingScreen&Auger | |||||||||
| G4-001 | Screen | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 5,124.96 | |
| Subtotal | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 5,124.96 | ||
| G5-000 | PrecastPost TensionedSBR Tanks | |||||||||
| G5-001 | Bulk Excavate SBR Structure | 100,000.00 | 100,000.00 | 0.00 | 0.00 | 100,000.00 | 100.00 | 0.00 | 2,847.20 | |
| G5-002 | Stone Underslab-SBR Structure | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 854.16 | |
| G5-003 | Concrete Base Slab for SBR | 690,000.00 | 690,000.00 | 0.00 | 0.00 | 690,000.00 | 100.00 | 0.00 | 19,645.68 | |
| G5-004 | Backfill Tank | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G5-005 | Walls & Walkways | 750,000.00 | 750,000.00 | 0.00 | 0.00 | 750,000.00 | 100.00 | 0.00 | 21,354.00 | |
| G5-006 | Misc Metals | 60,000.00 | 60,000.00 | 0.00 | 0.00 | 60,000.00 | 100.00 | 0.00 | 1,708.32 | |
| Subtotal | 1,650,000.00 | 1,650,000.00 | 0.00 | 0.00 | 1,650,000.00 | 100.00 | 0.00 | 46,978.80 | ||
| G6-000 | Treatment Building | |||||||||
| G6-001 | Excavate Footers | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 1,138.88 | |
| G6-002 | Pour Footers | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 |
6 of 9
Application and Certificate For Payment -- page 6
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed - Previous Application | Work Completed - This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G6-003 | Pour Pier Footers | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| G6-004 | Pour Piers | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| G6-005 | Masonry Frost Walls | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 427.08 | |
| G6-006 | Backfill | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| G6-007 | Stone Under Slab | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 170.83 | |
| G6-008 | Plumbing Under Slab | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| G6-009 | Concrete Slab | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 512.50 | |
| G6-010 | Precast Flocculation Tank | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 996.52 | |
| G6-011 | Precast Effluent Storage Tank | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G6-012 | Poured In Place UV Channel | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | |
| G6-013 | Masonry | 72,000.00 | 72,000.00 | 0.00 | 0.00 | 72,000.00 | 100.00 | 0.00 | 2,049.98 | |
| G6-014 | Structural Steel & Deck | 28,000.00 | 28,000.00 | 0.00 | 0.00 | 28,000.00 | 100.00 | 0.00 | 797.22 | |
| G6-015 | Misc Metals | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | |
| G6-016 | FRP Grating | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| G6-017 | Dryvit | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 996.52 | |
| G6-018 | EPDM Roofing | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 1,138.88 | |
| G6-019 | Caulking | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 142.36 | |
| G6-020 | Hollow Metal & FRP Doors | 2,500.00 | 2,500.00 | 0.00 | 0.00 | 2,500.00 | 100.00 | 0.00 | 71.18 | |
| G6-021 | Overhead Doors | 19,500.00 | 19,500.00 | 0.00 | 0.00 | 19,500.00 | 100.00 | 0.00 | 555.20 | |
| G6-022 | Painting | 35,000.00 | 33,250.00 | 1,750.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 996.52 | |
| G6-023 | Top Entry Mixer | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G6-024 | Plumbing | 23,000.00 | 23,000.00 | 0.00 | 0.00 | 23,000.00 | 100.00 | 0.00 | 654.86 | |
| G6-025 | HVAC | 50,000.00 | 47,500.00 | 2,500.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 1,423.60 | |
| Subtotal | 575,000.00 | 570,750.00 | 4,250.00 | 0.00 | 575,000.00 | 100.00 | 0.00 | 16,371.41 | ||
| G7-000 | SBR/Chem Feed & Process Piping | |||||||||
| G7-001 | SBR Equipment | 790,000.00 | 790,000.00 | 0.00 | 0.00 | 790,000.00 | 100.00 | 0.00 | 22,492.88 |
7 of 9
Application and Certificate For Payment -- page 7
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed - Previous Application | Work Completed - This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G7-002 | Polymer Feed System | 18,000.00 | 17,100.00 | 900.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 512.50 | |
| G7-003 | Chem Feed Pumps & Piping | 18,000.00 | 16,200.00 | 1,800.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 512.50 | |
| G7-004 | Inline Static Mixers | 25,500.00 | 25,500.00 | 0.00 | 0.00 | 25,500.00 | 100.00 | 0.00 | 726.04 | |
| G7-005 | Inline Grinder | 8,500.00 | 8,500.00 | 0.00 | 0.00 | 8,500.00 | 100.00 | 0.00 | 242.01 | |
| G7-006 | Utility Water Pumps & Controls | 80,000.00 | 80,000.00 | 0.00 | 0.00 | 80,000.00 | 100.00 | 0.00 | 2,277.76 | |
| G7-007 | Instrumentation & Controls | 127,000.00 | 123,190.00 | 3,810.00 | 0.00 | 127,000.00 | 100.00 | 0.00 | 3,615.94 | |
| G7-008 | FRP Chemical Tank | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | |
| G7-009 | Process Piping | 245,000.00 | 245,000.00 | 0.00 | 0.00 | 245,000.00 | 100.00 | 0.00 | 6,975.64 | |
| G7-010 | Relocated Apple Brook Pump | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| Subtotal | 1,345,000.00 | 1,338,490.00 | 6,510.00 | 0.00 | 1,345,000.00 | 100.00 | 0.00 | 38,294.85 | ||
| G8-000 | Filtration & UV System | |||||||||
| G8-001 | Disk Filters | 470,000.00 | 470,000.00 | 0.00 | 0.00 | 470,000.00 | 100.00 | 0.00 | 13,381.84 | |
| G8-002 | Filter Feed Pumps | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| G8-003 | UV System | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 5,124.96 | |
| Subtotal | 660,000.00 | 660,000.00 | 0.00 | 0.00 | 660,000.00 | 100.00 | 0.00 | 18,791.52 | ||
| G9-000 | Sludge Digestion & Post EQTank | |||||||||
| G9-001 | Demo Interior | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G9-002 | Sandblasting & Painting | 160,000.00 | 160,000.00 | 0.00 | 0.00 | 160,000.00 | 100.00 | 0.00 | 4,555.52 | |
| G9-003 | Course Bubble Diffuser | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 854.16 | |
| G9-004 | Centrifugal Blower Recondition | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| G9-005 | Aeration Tank Rehabilitation | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 1,281.24 | |
| Subtotal | 275,000.00 | 275,000.00 | 0.00 | 0.00 | 275,000.00 | 100.00 | 0.00 | 7,829.80 | ||
| GG10-000 | Sludge Dewatering BldgAddition | |||||||||
| GG10-001 | Demo Centrifuge | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| GG10-002 | Demo Building | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| GG10-003 | Sawcut Floor | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 |
Application and Certificate For Payment -- page 8
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
8 of 9
| Item Number | Description | Scheduled Value | Work Completed | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo | |
|---|---|---|---|---|---|---|---|---|---|---|
| Previous Application | This Period | |||||||||
| GG10-004 | Excavate Footers | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 341.66 | |
| GG10-005 | Form & Pour Footers | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 227.78 | |
| GG10-006 | Masonry Frost Walls | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| GG10-007 | Backfill | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 170.83 | |
| GG10-008 | Underslab Plumbing | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 142.36 | |
| GG10-009 | Misc Metals | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 284.72 | |
| GG10-010 | Pour Concrete Slab | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 996.52 | |
| GG10-011 | Masonry Walls | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 711.80 | |
| GG10-012 | Dryvit | 1,500.00 | 1,500.00 | 0.00 | 0.00 | 1,500.00 | 100.00 | 0.00 | 42.71 | |
| GG10-013 | Frames & Doors | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 170.83 | |
| GG10-014 | Overhead Doors | 4,000.00 | 4,000.00 | 0.00 | 0.00 | 4,000.00 | 100.00 | 0.00 | 113.89 | |
| GG10-015 | Trolley & Hoist | 39,000.00 | 39,000.00 | 0.00 | 0.00 | 39,000.00 | 100.00 | 0.00 | 1,110.41||
| GG10-016 | Carpentry | 20,000.00 | 19,000.00 | 1,000.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 569.44 | |
| GG10-017 | Painting | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 142.36 | |
| GG10-018 | Plumbing | 7,500.00 | 6,750.00 | 750.00 | 0.00 | 7,500.00 | 100.00 | 0.00 | 213.54 | |
| GG10-019 | HVAC | |||||||||
| GG11-000 | Sludge DewateringSystem & Pipe | |||||||||
| GG11-001 | Centrifuge | 525,000.00 | 525,000.00 | 0.00 | 0.00 | 525,000.00 | 100.00 | 0.00 | 14,947.80 | |
| GG11-002 | Progressive Conveying System | 7,000.00 | 7,000.00 | 0.00 | 0.00 | 7,000.00 | 100.00 | 0.00 | 199.30 | |
| GG11-003 | Sludge Conveying System | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 512.50 | |
| GG11-004 | Process Pipe | 200,000.00 | 200,000.00 | 0.00 | 0.00 | 200,000.00 | 100.00 | 0.00 | 5,694.40 | |
| GG12-000 | Site Paving | |||||||||
| GG12-001 | Lump Sum | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 1,423.60 | |
| GG13-000 | Engineered Fill | |||||||||
| GG13-001 | Lump Sum | 4,400.00 | 4,400.00 | 0.00 | 0.00 | 4,400.00 | 100.00 | 0.00 | 125.28 | |
| GG14-000 | Flowable Fill | |||||||||
Application and Certificate For Payment -- page 9
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 23
Date: 10/31/10
Period To: 10/31/10
Contractor's Job Number: P28001
Architect's Project No:
9 of 9
| Item Number | Description | Scheduled Value | Work Completed | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo | |
|---|---|---|---|---|---|---|---|---|---|---|
| Previous Application | This Period | |||||||||
| GG14-001 | Lump Sum | 11,000.00 | 11,000.00 | 0.00 | 0.00 | 11,000.00 | 100.00 | 0.00 | 313.19 | |
| GG18-000 | Alternate G-18 | |||||||||
| GG18-001 | Lump Sum | 125,000.00 | 125,000.00 | 0.00 | 0.00 | 125,000.00 | 100.00 | 0.00 | 3,558.93 | |
| Subtotal | 1,180,400.00 | 1,178,650.00 | 1,750.00 | 0.00 | 1,180,400.00 | 100.00 | 0.00 | 33,608.29 | ||
| Application Total | 7,869,424.34 | 7,811,964.34 | 57,460.00 | 0.00 | 7,869,424.34 | 100.00 | 0.00 | 224,058.22 | ||
5. MINUTES
5 pgs
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
October 11, 2010
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday October 11, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Jack Yahraes, Fran Beck, Dana Pizarro, Joseph McCawley and Michael Steinberger. Also in attendance were: Mark Miller, Director of Public Works; Dave Evans from Brickhouse Environmental; Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; Carmen Battavio, Township Supervisor; and Steve McDonnell, Attorney.
COMMON ACRONYMS:
| MA - Municipal Authority | I&I - Inflow & Infiltration |
|---|---|
| HC - Historical Commission | RCSTP - Ridley Creek Sewer Treatment Plant |
| PC - Planning Commission | LCSTP - Lochwood Chase Sewer Treatment Plant |
| CB - Conservancy Board | DEP - Department of Environmental Protection |
| PR - Park & Recreation Board | EPA - Environmental Protection Agency |
| BOS - Board of Supervisors | NPDES - National Pollutant Discharge Elimination System |
| SSO - Sanitary System Overflow | WAS - Waste Activated Sludge |
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
At 7:05 pm Fran moved to go into Executive Session. Dana seconded the motion. The motion passed unanimously. The Executive Session ended at 8:15 pm and the regular meeting started.
2. RCSTP REPORTS
A. Brickhouse Report
Dave reported that Phases II and III were completed and the respective equipment placed in service during the month. The target date for removal of the job trailers for September 17, 2010 was achieved. Major components of the treatment system placed in service include the following:
- Screen building, including grinder and fine screening equipment.
- Influent lift station, including all three pumps.
- All SBRs are functional; however, only basins 1, 3, and 4 are in service as treatment units. Basin 2 was temporarily used as a sludge holding tank and will be placed in service as a treatment unit during October.
- The treated effluent post flow equalization basins are in service.
- The disc filter fed pumps are in service.
- The disc filters are in service
- The UV disinfection system is in service.
- The rehabilitated Davco sludge holding tanks are in service.
- The sludge dewatering system, centrifuge, is available and placed in service as needed.
EGTMA Staff installed a concrete apron in front of the overhead doors to the sludge dewatering building, retaining wall adjacent to the new treatment building near SBR No. 4, new telephone service and computer for the laboratory area.
MA Minutes 10/11/2010 1
2 of 5
The treatment plant received excessive flows during the tropical storm from September 30th through October 1st. Additional modifications to the control panel integrating the operation of the effluent EQ basin, disc filter feed pumps and UV system were implemented during the week of October 4th. The contractor is working to address minor adjustments to further refine the control system.
Performance testing of the SBRs, centrifuge dewatering systems and overall treatment process anticipated for October 2010 is under discussion. The NPDES permit limitations for the SBR treatment process has been moved back to December 2010, with possible re-evaluation to begin January 1, 2011. Operation and testing of the treatment plant's effluent towards the new discharge limitations is planned to begin mid October with evaluation and adjustment planned through November.
Additional meetings between representatives for the Municipal Authority, Pennoni Associates, Brickhouse Environmental and the Authority's Solicitor were conducted to discuss the outstanding claims and delays regarding the project.
B. Pennoni - Dan Barbato, reported the following:
RCSTP Upgrade and Expansion
- Construction phase services continue including: progress meetings with the contractors and township every other Thursday; observation services continue including coordination and communication with Brickhouse and the township; receipt, review, and return of contractor submittals; negotiation, review, and approval of Payment Requests and startup assistance.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- An estimate of Pennoni effort to observe the remaining construction, start-up activities, contract close-out, and as-built drawing preparation is being provided separately. The previous substantial completion date was August 27, 2010. We generated an estimate for additional time from August 27 to substantial completion based on a substantial completion date of October 15. On October 7, Clinger was determined to be substantially complete following a review of UV system wiring by Pennoni's electrical designer. Worth and Company are working on outstanding items required to achieve substantial completion.
- Punchlists for Worth and Clinger are in progress.
I/I Metering Project
- The Township continues to meter flows at selected locations. Metering data was reviewed for the period of March through June. Pennoni provided recommendations for meter locations for the next round of data collection.
Ridley Creek Consent Order
- The Semi-Annual Report due on September 30 was prepared and submitted to DEP on September 28 as required by the CO&A. The next report is due to DEP in March of 2011. DEP comments on the March 2010 were addressed and we received confirmation from DEP that the report was received. Based on review of the data,
MA Minutes 10/11/2010 2
3 of 5
clear progress is being made toward reducing inflow and infiltration and we are tracking remaining problem areas.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- These documents were provided to the Township for submittal to DEP. We received comments from DEP and are in the process of addressing. We anticipate completing response to comments in November.
Marydell PS Elimination Planning
- The notification letters (Component 4) and associated documents are being prepared for distribution to planning and health department for their review and comment.
Wastewater Contract Operations Bid
We are reviewing the draft bid package and will provide comments.
Applebrook Comprehensive Groundwater Evaluation
- Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The Evaluation is in progress and we expect to be complete in November.
C. Cost Summary - Report was reviewed.
D. Change Orders - Pennoni Project #EGMA 0707, 10/4/10, $3,050.21 for additional fence. Joe moved to approve payment. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
RCSTP CHANGE ORDERS
A. None.
3. RCSTP INVOICES
A. Joe moved to approve payment for the following invoices. Fran seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
- Grainger #9355202699, 10/23/10, $212.40
- Yale Electric Supply #7223322-01, 9/20/10, $88.32
- Yale Electric Supply #7223479-01, 9/21/10, $114.76
- Acton #PRI0664628, 9/30/10, $305.00
- S. Bahnatka, 9/17/10, $450.00
- M&S Service Co, Inc., #7522-0, 9/7/10, $4,190.00
- Hammond & McCloskey, #4721, 9/10/10/, $851.22
- Main Line Concrete, #265721, 8/25/10, $357.50
- Pipe Xpress, #48065, 9/1/10, $465.02
- Pipe Xpress, #48102, 9/7/10, $86.25
- EGT, Reimbursement, 9/4/10, $388.60
- Home Depot, 9/9/10, $133.27
- Lowe's, 9/10/10, $344.98
- Lowe's, 9/10/10, $79.55
- Pennoni, #452026, 9/29/10, $12,521.81
MA Minutes 10/11/2010 3
4 of 5
- Worth, #P28001, 9/30/10, $54,520.50
- Brickhouse Environment, #5559-A, 10/1/10, $6,785.00
- Brickhouse Environment, #5559, 10/1/10, $10,695.00
4. CHAIRMAN'S REPORT
None
5. APPROVAL OF MINUTES
A. Fran moved to approve the minutes of the September 13, 2010 as corrected. Dana seconded the motion. The motion passed unanimously.
6. ENGINEER'S REPORT – See 2B.
7. APPROVAL OF INVOICES
A. Fran moved to approve payment for the following invoices. Joe seconded the motion. There was no further discussion. The motion passed unanimously.
- Pennoni #452079, 9/29/10, $918.75
- Pennoni #452027, 9/29/10, $517.50.
8. LIAISON REPORTS
A. No reports.
9. FINANCIAL REPORTS
The preliminary budget was reviewed. Joe suggested adding a capital reserve. Dana agreed. The amount of $10,000-13,000 for Pennoni I/I reports was discussed. Dan explained that it is 2 reports per year which require collection of data, comparison to previous reports and any necessary follow-up.
Dana moved to accept the 2011 preliminary budget with a note to reserve $250,000.00 for potential additional costs at Ridley. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
10. GOALS
Dana will provide an article by Nov. 11, 2010 for the next Township newsletter.
11. OLD BUSINESS
A. Comprehensive Plan - The members reviewed the goals. Rick will submit them to the Board of Supervisors.
12. NEW BUSINESS
A. The Authority approved the request to adjust the budget for Pennoni for the remainder of the year and increase it by $3,000.00.
B. Since Artesian is leaving, Joe reminded the members that they need to find someone to run the plant. He would like to award this by November. He had several suggestions including AQUA, Delcura and West Goshen.
C. Dan explained that Pennoni is presenting an estimate for additional fees which would cover the period 8/27/10 to 10/15/10. The scope of work over the period includes:
- Construction observation and RFIs
MA Minutes 10/11/2010 4
- Participation in construction progress meetings
- Additional inspections, investigations, and on-site meetings related to electrical
- Additional plant start-up assistance and troubleshooting
The estimated amount is $18,720.00. They will provide an exact bill. There is 2% of the budget remaining. Final work to be done may take another month. Dan does not anticipate more extras. Mike moved to approve the request for additional fees estimated at $18,720.00. Dana seconded the motion. There was no further discussion. The motion passed unanimously.
13. CAPACITY REQUESTS
A. None
14. SEWER REPORTS
A. Mark Miller reported the following:
- Televising and cleaning due to I&I showed a manhole needed repair. The repair was done in-house and cost $1,250.00. They cleaned it out to Route 352. They will check for additional defects.
- The recent storm dropped 1.25" on rain and then another 6.25" of rain. It went into the wetlands and did not overflow into the field.
- Net flows for September were down.
15. ANY OTHER MATTER
None
16. CORRESPONDENCE
None
17. PUBLIC COMMENT
None
18. ADJOURNMENT
There being no further business, Joe moved to adjourn the meeting. Fran seconded the motion. The meeting was adjourned at 9:15 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 10-11-10 Draft.doc
MA Minutes 10/11/2010 5
EGMA 1000
Pennoni
MEMORANDUM
6. ENGINEER'S REPORT
2
2 pgs
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Daniel Barbato, P.E. Authority Engineer |
| DATE: | November 3, 2010 |
| SUBJECT: | Engineer's Report |
RCSTP Upgrade and Expansion
- Construction phase services have transitioned to punchlist monitoring, review of operations and maintenance submittals, and startup assistance, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Brickhouse and the Township, and approval of contractor Payment Requests.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation are working on punchlist completion and outstanding items are expected to be complete by the end of November.
- Pennoni will complete review of all Operations and Maintenance submittals by the end of November.
I/I Metering Project
- The Township continues to meter flows at selected locations. Pennoni provided recommendations for meters locations for the current round of data collection, and we will review the data when it is available.
Ridley Creek Consent Order
- The Semi-Annual Report due on September 30 was prepared and submitted to DEP on September 28 as required by the CO&A. The next report is due to DEP in March of 2011.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- These documents were provided to the Township for submittal to DEP. The Township received comments from DEP and we are in the process of addressing. We anticipate completing the responses in early December.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\Memo to EGMA Board 2010-11-03.docx
2 of 2
EGMA 1000
Marydell PS Elimination Planning
- The draft report sections for the Act 537 Plan Revision are being assembled and a determination will be made in the next week regarding the schedule to finish and submit the report and required notifications.
Wastewater Contract Operations Bid
- We are assisting with responses to bidder questions on the RFP.
Applebrook Comprehensive Groundwater Evaluation
- Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The Evaluation is in progress and we recently received responses to our data request needed to complete the report. We anticipate completing the report in November.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\Memo to EGMA Board 2010-11-03.docx
7. INVOICES
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 09/30/2010 Client No: 6604-01M Invoice No: 82931 |
|---|
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 09/13/2010 RFA |
Review packet for Authority meeting of 9/13/10; attend regular meeting of Authority. | 2.50 | |
| For Current Services Rendered | 2.50 | 475.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.50 | $190.00 | $475.00 |
| Previous Balance | $589.00 |
|---|---|
| Total Current Charges | 475.00 |
| 09/16/2010 Fee Payment | -589.00 |
| Balance Due | $475.00 |
ok RS
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 454694 Invoice Date : 10/27/2010 Project : EGMA1000 Project Name : 2010 Annual Services |
|---|
For Services Rendered through: 10/17/2010
Preparation and participation in monthly board meeting and consultation with Township, preparation of monthly report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 603.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 603.75 | |
| Amount Due This Invoice | $603.75 |
| Fee : | 13,338.25 |
|---|---|
| Prior Billings : | 10,338.25 |
| Current Billings : | 603.75 |
| Total Billings : | 10,942.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.75 | 105.00 | 603.75 |
| Labor Total: | 5.75 | 603.75 |
| Total Phase : **** -- Professional Services | Labor : | $603.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1000 -- 2010 Annual Services | Labor : | $603.75 |
| Expense : | $0.00 |
Approved Mark Miller
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1000 Invoice Summary.xls
Invoice Date 10-27-2010
| Project: | 2010 Annual Services | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1000 | ||
| Invoice No: | 454694 | ||
| Invoice Period: | 9/20/2010 | to | 10/17/2010 |
| Initial Authorization: | $ 10,338.25 | Date: | 1/11/2010 |
| Changes: | $ 3,000.00 | Date: | |
| Contract Amount: | $ 13,338.25 | ||
| Previously Invoiced: | $ 10,338.25 | ||
| Current Invoice: | $ 603.75 | ||
| Invoiced to Date ($): | $ 10,942.00 | ||
| Invoiced to Date (%): | 82% | ||
| Remaining Budget ($): | $ 2,396.25 | ||
| Remaining Budget (%): | 18% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2010 Annual Services |
| Phase Budget: | $ 13,338.25 |
| Previously Invoiced: | $ 10,338.25 |
| Current Invoice: | $ 603.75 |
| Invoiced to Date ($): | $ 10,942.00 |
| Invoiced to Date (%): | 82% |
| Remaining Budget ($): | $ 2,396.25 |
| Remaining Budget (%): | 18% |
| Comments: | Preparation and participation in monthly board meeting and consultation with Township, preparation of monthly report. |
|---|
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 454695 Invoice Date : 10/27/2010 Project : EGMA1002 Project Name : Applebrook Comp. Groundwater Eval. |
|---|
For Services Rendered through: 10/17/2010
Review permits, groundwater conditions and regulatory requirements. Preliminary hydrogeologic evaluation.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,548.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,548.75 | |
| Amount Due This Invoice | $1,548.75 |
| Fee : | 5,500.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 1,548.75 |
| Total Billings : | 1,548.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Senior Engineer | 14.75 | 105.00 | 1,548.75 |
| Labor Total: | 14.75 | 1,548.75 |
| Total Phase : **** -- Professional Services | Labor : | $1,548.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1002 -- Applebrook Comp. Groundwater Eval. | Labor : | $1,548.75 |
| Expense : | $0.00 |
Approved Mark Miller
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1002 Invoice Summary.xlsx
Invoice Date 10-27-2010
| Project: | Applebrook Comp. Groundwater Eval. | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 1002 | ||
| Invoice No: | 454695 | ||
| Invoice Period: | 9/20/2010 | to | 10/17/2010 |
| Initial Authorization: | $ 5,500.00 | Date: | 9/20/2010 |
| Changes: | $ - | Date: | |
| Contract Amount: | $ 5,500.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 1,548.75 | ||
| Invoiced to Date ($): | $ 1,548.75 | ||
| Invoiced to Date (%): | 28% | ||
| Remaining Budget ($): | $ 3,951.25 | ||
| Remaining Budget (%): | 72% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Applebrook Comp. |
| Phase Budget: | $ 5,500.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,548.75 |
| Invoiced to Date ($): | $ 1,548.75 |
| Invoiced to Date (%): | 28% |
| Remaining Budget ($): | $ 3,951.25 |
| Remaining Budget (%): | 72% |
| Comments: | Review permits, groundwater conditions and regulatory requirements. Preliminary hydrogeologic evaluation. |
|---|
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 454693 Invoice Date : 10/27/2010 Project : EGMA0903 Project Name : RCSTP Sewer Modeling |
|---|
For Services Rendered through: 10/17/2010
Finalize and submit semi-annual report to DEP as required by the CO&A. Consultation with Township.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,620.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,620.00 | |
| Amount Due This Invoice | $1,620.00 |
| Fee : | 30,670.00 |
|---|---|
| Prior Billings : | 28,789.00 |
| Current Billings : | 1,620.00 |
| Total Billings : | 30,409.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 18.00 | 90.00 | 1,620.00 |
| Labor Total: | 18.00 | 1,620.00 |
| Total Phase : **** -- Professional Services | Labor : | $1,620.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA0903 -- RCSTP Sewer Modeling | Labor : | $1,620.00 |
| Expense : | $0.00 |
ok RS 11-4
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0903 Invoice Summary.xls
Invoice Date 10-27-2010
| Project: | RCSTP Sewer Modeling | ||
|---|---|---|---|
| Pennoni Job No.: | EGMA 0903 | ||
| Invoice No: | 454693 | ||
| Invoice Period: | 9/20/2010 | to | 10/17/2010 |
| Initial Authorization: | $ 28,300.00 | Date: | 9/17/2009 |
| Changes: | $ 2,370.00 | Date: | 9/15/2010 |
| Contract Amount: | $ 30,670.00 | ||
| Previously Invoiced: | $ 28,789.00 | ||
| Current Invoice: | $ 1,620.00 | ||
| Invoiced to Date ($): | $ 30,409.00 | ||
| Invoiced to Date (%): | 99% | ||
| Remaining Budget ($): | $ 261.00 | ||
| Remaining Budget (%): | 1% |
Budget by Phase:
| Phase No. | |
|---|---|
| Phase Name: | RCSTP Sewer Modeling |
| Phase Budget: | $ 30,670.00 |
| Previously Invoiced: | $ 28,789.00 |
| Current Invoice: | $ 1,620.00 |
| Invoiced to Date ($): | $ 30,409.00 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 261.00 |
| Remaining Budget (%): | 1% |
| Comments: | Finalize and submit semi-annual report to DEP as required by the CO&A. Consultation with Township. |
|---|
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354.1300 • FAX (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE
INVOICE
| SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER PA 19830 |
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR. |
|---|---|
| TERMS: NET 30 DAYS | INVOICE NUMBER: 302735 |
| INVOICE DATE 10/18/10 |
CUST. ACCT. NO. 016716 |
CUST. JOB NO. | CUST. P.O. NO. | ZONE 7 |
|---|---|---|---|---|
| JOB NAME 1751 TOWN DRIVE |
PLANT 01 WEAVERLAND |
|||
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/15/10 | A053371 | 24.16 | TN | 12.410 | 2A 21.92 | 299.83 |
| 10/15/10 | A053386 | 24.19 | TN | 12.410 | 2A 21.94 | 300.20 RC? |
APPROVED BY: MSe
DATE PAID:
CHECK #:
CHARGED TO: 01454-7350
Trail Line Rd.
| [X] TAX EXEMPT | TOTAL TONS 48.35 |
TOTAL SALE 600.03 |
TRUCK CHARGES .00 |
SALES TAX .00 |
|---|---|---|---|---|
| TOTAL 600.03 300.20 | ||||
| EAST GOSHEN TOWNSHIP | ACCOUNT 016716 |
DATE 10/18/10 |
INVOICE NO. 302735 |
AMOUNT 600.03 300.20 |
|---|---|---|---|---|
| MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC. PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT |
PAY BY | M160 | ||
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202
PLANT: 01 WEAVERLAND Phone: 717-354-1370
| ORDER NO. 1007160020 |
TICKET NUMBER 0101A053371 |
SCALE 1 |
AUTO/MANUAL A |
DATE 10/15/2010 |
TIME 09:43 AM |
|---|
| SOLD TO EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER: 016716 PHONE: 610-692-7171 PO: |
|---|---|
| SHIP TO |
QUOTE: 1001040002 STATE: ZONE: 7 |
| PRODUCT ID 11 - 421 |
PRODUCT DESCRIPTION 2A |
[ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
|---|---|---|
| JOB NAME / LOCATION 1751 TOWN DRIVE |
WEST CHESTER | JOB: ITEM: |
JOB REQUIRED NUMBERS
| TAG NO. NA |
AXLES 4 |
TRUCK MM689 |
CARRIER NAME PAUL M. MARTIN TRUCKING, LLC |
CARRIER CODE 689 |
|---|
| PICK-UP | FREIGHT PPD XX |
FREIGHT COLLECT | ACCUMULATIVE QUANTITIES | PAYMENT METHOD BILLABLE |
|---|
| US WEIGHT | METRIC WEIGHT | ORDERED: 200.00 | MATERIAL | ||
|---|---|---|---|---|---|
| 72,980 | GROSS | ||||
| 24,660 | TARE | TODAY: 24.16 LOADS: 1 |
HAUL | ||
| 48,320 | NET | TO DATE: 121.36 LOADS: 5 |
ADD'L CHARGES | ||
| 24.16 | TN | ACCUMULATED CASH SALE | TAX |
WEIGHED BY: CYNTHIA M KOCHEL 016049
TOTAL THIS LOAD
| INSPECTOR'S SIGNATURE | JOB ARRIVAL TIME | JOB DEPARTURE TIME |
|---|
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left.
*** Back In Drive ***
mark 610-656-2742.
APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: 07424-
R/C Plant
YOUR BUSINESS IS GREATLY APPRECIATED.
01-0101A053371 *
CUSTOMER'S COPY
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354.1300 • FAX (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE
INVOICE
| SOLD TO: EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER PA 19830 |
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR. |
|---|---|
| TERMS: NET 30 DAYS | INVOICE NUMBER: 302737 |
| INVOICE DATE 10/18/10 |
CUST. ACCT. NO. 016716 002 |
CUST. JOB NO. | CUST. P.O. NO. | ZONE 7 |
|---|---|---|---|---|
| JOB NAME 2010 PRICING/TWP BUILDING |
PLANT 01 WEAVERLAND |
|||
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/15/10 | A053352 | 23.88 | TN | 12.410 | 2A 21.66 | 296.35 RC |
| 10/15/10 | A053359 | 23.76 | TN | 12.410 | 2A 21.55 | 294.86 |
APPROVED BY: MSe
DATE PAID:
CHECK #:
CHARGED TO: 1454-7350 294.86
1 Load To R/C plant
(to paid by MA construction)
1 Load to Line Rd
For Pathway
[initials]
| [X] TAX EXEMPT | TOTAL TONS 47.64 |
TOTAL SALE 591.21 |
TRUCK CHARGES .00 |
SALES TAX .00 |
|---|---|---|---|---|
| TOTAL 591.21 | ||||
| EAST GOSHEN TOWNSHIP | ACCOUNT 016716 002 |
DATE 10/18/10 |
INVOICE NO. 302737 |
AMOUNT 591.21 |
|---|---|---|---|---|
| MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC. PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT |
PAY BY | M160 | ||
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202
PLANT: 01 WEAVERLAND Phone: 717-354-1370
| ORDER NO. 1001070010 |
TICKET NUMBER 0101A053352 |
SCALE 1 |
AUTO/MANUAL A |
DATE 10/15/2010 |
TIME 07:01 AM |
|---|
| SOLD TO EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER: 016716 PHONE: 610-692-7171 PO: |
|---|---|
| SHIP TO |
QUOTE: 1001040002 STATE: ZONE: 7 |
| PRODUCT ID 11 - 421 |
PRODUCT DESCRIPTION 2A |
[ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
|---|---|---|
| JOB NAME / LOCATION 2010 PRICING/TWP BUILDING |
WEST CHESTER | JOB: ITEM: |
JOB REQUIRED NUMBERS
| TAG NO. PA |
AXLES 4 |
TRUCK RA20 |
CARRIER NAME ARTERS TRUCKING |
CARRIER CODE 525 |
|---|
| PICK-UP | FREIGHT PPD XX |
FREIGHT COLLECT | ACCUMULATIVE QUANTITIES | PAYMENT METHOD BILLABLE |
|---|
| US WEIGHT | METRIC WEIGHT | ORDERED: 500.00 | MATERIAL | ||
|---|---|---|---|---|---|
| 72,520 | GROSS | ||||
| 24,760 | TARE | TODAY: 23.88 LOADS: 1 |
HAUL | ||
| 47,760 | NET | TO DATE: 96.40 LOADS: 4 |
ADD'L CHARGES | ||
| 23.88 | TN | ACCUMULATED CASH SALE | TAX |
WEIGHED BY: CYNTHIA M KOCHEL 016049
TOTAL THIS LOAD
| INSPECTOR'S SIGNATURE | JOB ARRIVAL TIME | JOB DEPARTURE TIME |
|---|
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 100 south, 202 south to paoli pike exit, left on paoli pike, cross boot rd to twp bldg on right. **ASK FOR MARK--610-656-2742.****
APPROVED BY: [initials]
DATE PAID:
CHECK #:
CHARGED TO: 07424-7454
Sub grade at Plant
YOUR BUSINESS IS GREATLY APPRECIATED.
01-0101A053352 *
CUSTOMER'S COPY
10. GOALS
2 pgs
2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
NOVEMBER REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - Completed; Need by 8/11/10 Joe – Mark - Completed; Need by 11/10/10 Dana
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana – Not Completed; 3 rd Quarter (September) Joe - Completed - Attended the August meeting; 4 th Quarter (December) Jack
- Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10). West Pike Township request received on August 6, 2010, MA directed staff to look into on August 9, 2010
- Implement I&I Plan. – Completed and Ongoing – March Report filed on time, September Report filed in time, I&I repair work continues.
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction. Substantial Completion October 21, 2010
- Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. Completed - SBR Tour conducted on 3/15/10
- Invite Board of Supervisors and all other ABC members to a primer educational session on SBR's. Completed - SBR Class conducted on 3/15/10
- Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens' facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. BoS adopted Resolution 10-106 on 6/15/2010. Revisions sent to PA DEP on 6/16/10. Received DEP 7/13/10 review letter. Currently working on response.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\110810.doc
2 of 2
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. BoS adopted resolutions 10-105 and 10-108 on 6/15/10. Revisions sent to PA DEP on 6/16/10. Received DEP 7/14/10 review letter. Currently working on response.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
- Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Obtained agreement on diversion from West Goshen on 5/13/10.
FUNDING
- H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. Completed - We have received the money. Used grant money to pay Worth and Clinger August invoices
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\110810.doc
12. NEW BUSINESS
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100, P.O. Box 562
West Chester, PA 19381-0562
p. 610.696.8225
www.gawthrop.com
Robert F. Adams
610.696.8225 x 125
rfadams@gawthrop.com
October 7, 2010
Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
RECEIVED
BY: [stamp]
OCT 12 2010
Re: 2011 Fees For Legal Services
Dear Rick:
Please be advised that for 2011 Gawthrop Greenwood has no plans to change the rates or the terms of engagement under which we currently service East Goshen Municipal Authority. Our rates were last adjusted in January of 2009. Normally, we would seek an increase in our rates after two years, but we are sensitive to the financial pressures currently being experienced by all municipalities and do not want to be the cause of additional stress.
The firm is pleased to have the continuing opportunity to provide legal services to the Municipal Authority in 2011 at our current rates, which are $190 per hour for lawyers and $100 per hour for paralegals. I highly value our long-standing relationship with East Goshen Township and its officials and staff. I would expect that for purposes of budgeting you would be safe in assuming that our experience in 2011 will be similar to the amount of work we did in 2010.
Very truly yours,
[signature]
Robert F. Adams
RFA/cb
12. NEW BUSINESS
b.
1 pg
Brickhouse Environmental
Consultants and Engineers
November 2, 2010
RECEIVED
BY: [stamp]
NOV - 2 2010
Mr. Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Ridley Creek Sewer Treatment Plant Expansion
Extension Request
BE Project No. 09-2532-0
Dear Mr. Smith:
This letter's purpose is to notify the Authority of the budget status and request continuance for Brickhouse Environmental's role as Project Manager for the Ridley Creek Sewer Plant Expansion.
Brickhouse Environmental's original not to exceed budget ($175,030 at $115 per hour) was based upon 67weeks duration to August 8, 2010. A time extension for our services was subsequently approved up to and including the October 11, 2010 Authority Board Meeting. This approval was without an increase in hours or value beyond the original budget because original hours and value remained, at that time.
As of the October 11, 2010 Authority Board Meeting, Brickhouse had expended the original budget's total hours and value.
As of the close of October 2010 (end of week 79), Brickhouse has totaled 1603 hours (83 hours beyond the original budget).
By this letter, Brickhouse Environmental requests discussion at the upcoming November 8, 2010 Board Meeting and approval for Brickhouse to continue, on a time basis at the original $115 per hour, until services are no longer required by the Authority.
We have greatly enjoyed our association with you and the Authority. Please contact me with any questions.
Best Regards,
[signature]
David W. Evans
Project Manager
cc: Scott Towler, P.E., Project Manager
DWE/ps
J:\092532.0\Correspondence\11-2-10 Extension Request Letter.doc
515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com
When Creativity & Experience Count
12. NEW BUSINESS
C.
5 pgs
MAILLIE, FALCONIERO & COMPANY, LLP
Certified Public Accountants and Business Counselors
17 East Gay Street
PO Box 3068
West Chester, PA 19380-3068
610-696-4353
FAX NO.: 610-430-8811
www.maillie.com
George J. Falconero
James J. Lennon
John J. Crenny, Jr.
Frank L. Pellegrini
Jeffrey S. Rolfe
Sol I. Cohn
James M. Powers
Glenn B. Bachman
D. Scott Detar
Raymond T. Mock
Robert L. Caruso
Edward J. Furman
Robert L. Boland
Robert M. Manero
October 22, 2010
To the Board of Directors
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
RECEIVED
BY: [stamp]
OCT 25 2010
Attention: Louis F. Smith, Township Manager
We are pleased to confirm our understanding of the services we are to provide the East Goshen Municipal Authority for the year ended December 31, 2010. We will audit the financial statements of the East Goshen Municipal Authority as of and for the year ended December 31, 2010. Accounting standards generally accepted in the United States provide for certain required supplementary information (RSI), such as management's discussion and analysis (MD&A), to supplement the East Goshen Municipal Authority's basic financial statements. Such information, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. As part of our engagement, we will apply certain limited procedures to East Goshen Municipal Authority's RSI in accordance with auditing standards generally accepted in the United States of America. These limited procedures will consist of inquiries of management regarding the methods of preparing the information and comparing the information for consistency with management's responses to our inquiries, the basic financial statements and other knowledge we obtained during our audit of the basic financial statements. We will not express an opinion or provide any assurance on the information because the limited procedures do not provide us with sufficient evidence to express an opinion or provide any assurance. The following RSI is required by generally accepted accounting principles and will be subjected to certain limited procedures, but will not be audited:
- Management's Discussion and Analysis.
Counselors to the Closely Held Business Since 1946
2 of 5
MAILLIE, FALCONIERO & COMPANY, LLP
Certified Public Accountants and Business Counselors
| To the Board of Directors East Goshen Municipal Authority |
- 2 - | October 22, 2010 |
|---|
Audit Objective
The objective of our audit is the expression of an opinion as to whether your basic financial statements are fairly presented, in all material respects, in conformity with generally accepted accounting principles. Our audit will be conducted in accordance with auditing standards generally accepted in the United States of America and will include tests of the accounting records and other procedures we consider necessary to enable us to express such an opinion. If our opinion on the financial statements is other than unqualified, we will fully discuss the reasons with you in advance. If, for any reason, we are unable to complete the audit or are unable to form or have not formed an opinion, we may decline to express an opinion or to issue a report as a result of this engagement.
Management Responsibilities
Management is responsible for the basic financial statements and all accompanying information as well as all representations contained therein. You are also responsible for making all management decisions and performing all management functions; for designating an individual with suitable skill, knowledge, or experience to oversee our assistance with the preparation of your financial statements and related notes and any other nonattest services we provide; and for evaluating the adequacy and results of those services and accepting responsibility for them.
Management is responsible for establishing and maintaining effective internal controls, including monitoring ongoing activities; for the selection and application of accounting principles; and for the fair presentation in the financial statements of the financial position of the East Goshen Municipal Authority and the changes in net assets and cash flows, in conformity with U.S. generally accepted accounting principles.
Management is also responsible for making all financial records and related information available to us and for the accuracy and completeness of that information. Your responsibilities include adjusting the financial statements to correct material misstatements and confirming to us in the representation letter that the effects of any uncorrected misstatements aggregated by us during the current engagement and pertaining to the latest period presented are immaterial, both individually and in the aggregate, to the financial statements taken as a whole.
MAILLIE, FALCONIERO & COMPANY, LLP
Certified Public Accountants and Business Counselors
To the Board of Directors
East Goshen Municipal Authority - 3 - October 22, 2010
You are responsible for the design and implementation of programs and controls to prevent and detect fraud, and for informing us about all known or suspected fraud or illegal acts affecting the government involving (1) management, (2) employees who have significant roles in internal control and (3) others where the fraud or illegal acts could have a material effect on the financial statements. Your responsibilities include informing us of your knowledge of any allegations of fraud or suspected fraud affecting the government received in communications from employees, former employees, regulators, or others. In addition, you are responsible for identifying and ensuring that the entity complies with applicable laws and regulations.
With regard to the electronic dissemination of audited financial statements, including financial statements published electronically on your website, you understand that electronic sites are a means to distribute information, and, therefore, we are not required to read the information contained in these sites or to consider the consistency of other information in the electronic site with the original document.
Audit Procedures - General
An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements; therefore, our audit will involve judgment about the number of transactions to be examined and the areas to be tested. We will plan and perform the audit to obtain reasonable rather than absolute assurance about whether the financial statements are free of material misstatement, whether from (1) errors, (2) fraudulent financial reporting, (3) misappropriation of assets, or (4) violations of laws or governmental regulations that are attributable to the entity or to acts by management or employees acting on behalf of the entity.
Because an audit is designed to provide reasonable, but not absolute, assurance and because we will not perform a detailed examination of all transactions, there is a risk that material misstatements may exist and not be detected by us. In addition, an audit is not designed to detect immaterial misstatements or violations of laws or governmental regulations that do not have a direct and material effect on the financial statements. Our responsibility as auditors is limited to the period covered by our audit and does not extend to any later periods for which we are not engaged as auditors.
Our procedures will include tests of documentary evidence supporting the transactions recorded in the accounts, and may include tests of the physical existence of inventories, and direct confirmation of receivables and certain other assets and liabilities by correspondence with selected individuals, funding sources, creditors and financial institutions. We will request written representations from your attorneys as part of the engagement, and they may bill you for responding to this inquiry. At the conclusion of our audit, we will require certain written representations from you about the financial statements and related matters.
MAILLIE, FALCONIERO & COMPANY, LLP
Certified Public Accountants and Business Counselors
To the Board of Directors
East Goshen Municipal Authority - 4 - October 22, 2010
Audit Procedures - Internal Control
Our audit will include obtaining an understanding of the entity and its environment, including internal control, sufficient to assess the risks of material misstatement of the financial statements and to design the nature, timing and extent of further audit procedures. An audit is not designed to provide assurance on internal control or to identify deficiencies in internal control. However, during the audit, we will communicate to management and those charged with governance internal control related matters that are required to be communicated under AICPA professional standards.
Audit Procedures - Compliance
As part of obtaining reasonable assurance about whether the financial statements are free of material misstatement, we will perform tests of the East Goshen Municipal Authority's compliance with applicable laws and regulations and the provisions of contracts and agreements. However, the objective of our audit will not be to provide an opinion on overall compliance, and we will not express such an opinion.
Engagement Administration, Fees and Other
During the course of our professional practice, with the prior written consent of our clients, we provide our clients' confidential accounting and/or financial data, without the clients being specifically identified, to a third party, Sageworks, Inc., for statistical and/or industry research and/or benchmarking purposes only. In the course of this engagement, or thereafter, as long as you are a client of Maillie, Falconiero & Company, LLP, we may wish to provide your confidential data to that third party in such a format. You will not be identified in any way. By your signature on this letter, you expressly authorize us to make such disclosure of your confidential accounting and/or financial data, as we may elect within our discretion, with the understanding that, in doing so, you will not be specifically identified.
We understand that your employees will prepare all cash, debt and other confirmations we request and will locate any documents selected by us for testing.
James E. Yiaski, CPA, is the engagement partner and is responsible for supervising the engagement and signing the report or authorizing another individual to sign it.
MAILLIE, FALCONIERO & COMPANY, LLP
Certified Public Accountants and Business Counselors
To the Board of Directors
East Goshen Municipal Authority - 5 - October 22, 2010
Our fee for these services will be at our standard hourly rates plus out-of-pocket costs (such as report reproduction, word processing, postage, travel, copies, telephone, etc.) Based on our experience with the 2009 audit and discussions concerning the Authority's 2010 activities, we estimate our fee with be approximately $7,500. Our standard hourly rates vary according to the degree of responsibility involved and the experience level of the personnel assigned to your audit. Our invoices for these fees will be rendered as work progresses and are payable on presentation. In accordance with our firm policies, work may be suspended if your account becomes 30 days or more overdue and will not be resumed until your account is paid in full. If we elect to terminate our services for nonpayment, our engagement will be deemed to have been completed upon written notification of termination, even if we have not completed our report. You will be obligated to compensate us for all time expended and to reimburse us for all out-of-pocket costs through the date of termination. The above fee is based on anticipated cooperation from your personnel and the assumption that unexpected circumstances will not be encountered during the audit. If significant additional time is necessary, we will discuss it with you and arrive at a new fee estimate before we incur the additional costs.
We appreciate the opportunity to be of service to the East Goshen Municipal Authority and believe this letter accurately summarizes the significant terms of our engagement. If you have any questions, please let us know. If you agree with the terms of our engagement as described in this letter, please sign the enclosed copy and return it to us.
Very truly yours,
MAILLIE, FALCONIERO & COMPANY, LLP
James E. Yiaski, CPA
RESPONSE:
This letter correctly sets forth the understanding of the East Goshen Municipal Authority.
By: ____________________________________________________
Title: ___________________________________________________
Date: ___________________________________________________
East Goshen Township Fund Accounting
MAILLIE, FALCONIERO
12. NEW BUSINESS d
Report Date 11/03/10
Vendor Expenditure History
PAGE 1
From 0901 to 1010
MARP14 run by BARBARA 3 : 26 PM
| Vendor | Vendor Name / Description | Budget# Sub# | Invoice # | GL Per | Req # | Req/Invc | Check# | Chk Date | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 808 | MAILLIE FALCONIERO & CO. EXAM. OF FINANCIAL STATEMENTS 2008 |
Auditing 07424 3110 |
74001 | 0905 | 22272 | 05/13/09 | 1967 | 05/13/09 | 6000.00 |
| PARTIAL BILLING RE: EXAM 2008 FINAN STATEMENTS | 01402 3110 | 76901 | 0906 | 22557 | 06/11/09 | 2910 | 06/16/09 | 19500.00 | |
| EXAM. FINANCIAL STMTS. 12/31/08 | 07424 3110 | 77156 | 0908 | 23089 | 08/18/09 | 1975 | 08/18/09 | 2500.00 | |
| FINAL BILL RE: 2008 FINANCIAL STMT. AUDIT | 01402 3110 | 79333 | 0912 | 24111 | 12/10/09 | 3843 | 12/11/09 | 6116.00 | |
| EXAMINATION OF FINANCIAL STATEMENTS DECEMBER 31, 2009 | 07424 3110 | 81556 | 1004 | 25365 | 04/29/10 | 2006 | 04/29/10 | 5000.00 | |
| PARTIAL BILLING-2009 FINANCE STMTS. | 01402 3110 | 83988 | 1005 | 25522 | 05/20/10 | 4645 | 05/21/10 | 17100.00 | |
| FINAL BILLING RE: 2009 FINANCIAL STATEMENT AUDIT | 01402 3110 | 84973 | 1007 | 26080 | 07/22/10 | 4999 | 07/23/10 | 3000.00 | |
| ACCTG. ASSIST. - CONVERTING RECORDS FROM CASH BASIS TO ACCRUAL | 01402 3110 | 84974 | 1007 | 26081 | 07/22/10 | 4999 | 07/23/10 | 5825.00 | |
| EXAM. FINANCIAL STATEMENTS 2009 | 07424 3110 | 84681 | 1008 | 26241 | 08/10/10 | 2014 | 08/10/10 | 1900.00 | |
| ***** | MAILLIE FALCONIERO & CO. | *66,941.00* | |||||||
| ***** | GRAND TOTAL ***** | 66,941.00 | |||||||
[Handwritten calculations at bottom of page:]
2008:
6000
2500
8500
2009:
5000
1900
6900
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
[Handwritten note top right:] 12. NEW BUSINESS
e.
1 pg
November 1, 2010
To: Municipal Authority
From: Mark Miller
Re: Lift Chain
I am asking for approval to purchase 200' of 3/8 in. stainless steel chain for the removal of pumps in the SBRS. The current pumps have a cable to lift them; however as time goes on it will become very difficult to pull with the buildup of debris that will get collected on the cable.
The chain installation will allow us to pull the pumps without having to drain the SBR down. I shopped between three vendors. Below is the cost for the chain and clevises.
200' - 3/8 Stainless steel chain
8 - 3/8 - Stainless steel clevises
Total $2,483.00
F:\Data\Shared Data\Public Works Dept\Municipal Authority\Letter to Municipal Auth. for steel chain for pump removal November 1.doc
14. SEWER RPTS
2008 FLOWMETERS
2010 OCTOBER 4TH QUARTER
| Precip | DATE | WESTTOWN WAY - READING | WESTTOWN WAY - GPD | ELLIS LANE - READING | ELLIS LANE - GPD | PAOLI PIKE - READING | PAOLI PIKE - GPD | WILSON DRIVE - READING | WILSON DRIVE - GPD | SUMMIT - GPD | NET FLOWS | DATE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 6.25 | 10/01/10 | 1,808,704 | 2,026,000 | 15,716,417 | 252,740 | 8,627,063 | 95,210 | 10,119,834 | 168,400 | 20,400 | 1,509,650 | 10/01/10 |
| 0.00 | 10/02/10 | 20,400 | 0 | 10/02/10 | ||||||||
| 0.26 | 10/03/10 | 20,400 | 0 | 10/03/10 | ||||||||
| 0.35 | 10/04/10 | 20,400 | 0 | 10/04/10 | ||||||||
| 0.37 | 10/05/10 | 1,813,869 | 1,291,250 | 15,776,494 | 150,193 | 8,643,065 | 40,005 | 10,146,185 | 65,878 | 20,400 | 1,035,175 | 10/05/10 |
| 0.15 | 10/06/10 | 1,815,235 | 1,366,000 | 15,793,007 | 165,130 | 8,647,282 | 42,170 | 10,154,830 | 86,450 | 20,400 | 1,072,250 | 10/06/10 |
| 0.00 | 10/07/10 | 1,816,457 | 1,222,000 | 15,806,321 | 133,140 | 8,650,923 | 36,410 | 10,162,723 | 78,930 | 20,400 | 973,520 | 10/07/10 |
| 0.00 | 10/08/10 | 1,817,655 | 1,198,000 | 15,818,940 | 126,190 | 8,654,598 | 36,750 | 10,170,241 | 75,180 | 20,400 | 959,880 | 10/08/10 |
| 0.00 | 10/09/10 | 20,400 | 0 | 10/09/10 | ||||||||
| 0.00 | 10/10/10 | 20,400 | 0 | 10/10/10 | ||||||||
| 0.34 | 10/11/10 | 20,400 | 0 | 10/11/10 | ||||||||
| 0.00 | 10/12/10 | 1,822,146 | 1,122,750 | 15,866,343 | 118,508 | 8,669,218 | 36,550 | 10,191,449 | 53,020 | 20,400 | 914,673 | 10/12/10 |
| 0.00 | 10/13/10 | 1,823,285 | 1,139,000 | 15,878,383 | 120,400 | 8,672,723 | 35,050 | 10,199,890 | 84,410 | 20,400 | 899,140 | 10/13/10 |
| 0.85 | 10/14/10 | 20,400 | 0 | 10/14/10 | ||||||||
| 0.00 | 10/15/10 | 1,825,724 | 1,219,500 | 15,905,085 | 133,510 | 8,681,708 | 44,925 | 10,216,205 | 81,575 | 20,400 | 959,490 | 10/15/10 |
| 0.00 | 10/16/10 | 20,400 | 0 | 10/16/10 | ||||||||
| 0.00 | 10/17/10 | 20,400 | 0 | 10/17/10 | ||||||||
| 0.30 | 10/18/10 | 1,829,114 | 1,130,000 | 15,943,794 | 129,030 | 8,698,948 | 57,467 | 10,231,567 | 51,207 | 20,400 | 892,297 | 10/18/10 |
| 0.14 | 10/19/10 | 1,830,327 | 1,213,000 | 15,956,667 | 128,730 | 8,704,613 | 56,650 | 10,239,081 | 75,140 | 20,400 | 952,480 | 10/19/10 |
| 0.00 | 10/20/10 | 1,831,488 | 1,161,000 | 15,968,732 | 120,650 | 8,709,894 | 52,810 | 10,246,826 | 77,450 | 20,400 | 910,090 | 10/20/10 |
| 0.00 | 10/21/10 | 20,400 | 0 | 10/21/10 | ||||||||
| 0.00 | 10/22/10 | 1,833,704 | 1,108,000 | 15,990,538 | 109,030 | 8,720,449 | 52,775 | 10,261,383 | 72,785 | 20,400 | 873,410 | 10/22/10 |
| 0.00 | 10/23/10 | 20,400 | 0 | 10/23/10 | ||||||||
| 0.00 | 10/24/10 | 20,400 | 0 | 10/24/10 | ||||||||
| 0.00 | 10/25/10 | 1,836,915 | 1,070,333 | 16,023,038 | 108,333 | 8,735,251 | 49,340 | 10,277,508 | 53,750 | 20,400 | 858,910 | 10/25/10 |
| 0.20 | 10/26/10 | 20,400 | 0 | 10/26/10 | ||||||||
| 0.15 | 10/27/10 | 1,839,132 | 1,108,500 | 16,045,519 | 112,405 | 8,745,863 | 53,060 | 10,295,694 | 90,930 | 20,400 | 852,105 | 10/27/10 |
| 0.00 | 10/28/10 | 20,400 | 0 | 10/28/10 | ||||||||
| 0.00 | 10/29/10 | 20,400 | 0 | 10/29/10 | ||||||||
| 0.00 | 10/30/10 | 20,400 | 0 | 10/30/10 | ||||||||
| 0.00 | 10/31/10 | 20,400 | 0 | 10/31/10 | ||||||||
| 15.56 | 1,241,095 | 136,285 | 49,227 | 79,650 | 975,934 |
| Metric | DAILY LOC | INQUIRER | EG TWP |
|---|---|---|---|
| MONTH TO DATE | 15.56 | ||
| NORMAL MONTH TO DATE | |||
| YEAR TO DATE | |||
| NORMAL YEAR TO DATE | 60 |
2007 flowmeters -all-stations separate month worksheets.xls
2008 FLOWMETERS
2010 OCTOBER 4TH QUARTER
| HERSHEY'S MILL - READING | HERSHEY'S MILL - GPD | ASHBRIDGE - READING | ASHBRIDGE - GPD | HICKS METER - READING | HICKS METER - GPD | RESERVOIR - READING | RESERVOIR - GPD | SHERMAN - READING | SHERMAN - GPD | BARKWAY - READING | BARKWAY - GPD |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 19,633,758 | 36,270 | 927,625 | 206,000 | 13,630,331 | 654,830 | 105,602,045 | 1,267,550 | 427,980 | 9,910 | 1,671,726 | 17,470 |
| 0 | |||||||||||
| 0 | |||||||||||
| 0 | |||||||||||
| 19,633,758 | 931,096 | 86,775 | 13,736,820 | 266,223 | 105,909,227 | 767,955 | 430,397 | 6,043 | 1,676,530 | 12,010 | |
| 19,633,758 | 931,976 | 88,000 | 13,770,303 | 334,830 | 105,996,639 | 874,120 | 431,026 | 6,290 | 1,677,727 | 11,970 | |
| 19,638,038 | 7,133 | 932,709 | 73,300 | 13,802,201 | 318,980 | 106,076,070 | 794,310 | 431,553 | 5,270 | 1,678,792 | 10,650 |
| 19,643,834 | 57,960 | 933,411 | 70,200 | 13,832,986 | 307,850 | 106,152,399 | 763,290 | 432,099 | 5,460 | 1,679,874 | 10,820 |
| 19,666,787 | 57,383 | 936,221 | 70,250 | 13,933,222 | 250,590 | 106,431,397 | 697,495 | 434,451 | 5,880 | 1,684,745 | 12,178 |
| 19,672,238 | 54,510 | 936,916 | 69,500 | 13,965,533 | 323,110 | 106,505,279 | 738,820 | 435,194 | 7,430 | 1,685,848 | 11,030 |
| 19,683,226 | 54,940 | 938,406 | 74,500 | 14,033,049 | 337,580 | 106,660,678 | 776,995 | 436,343 | 5,745 | 1,687,877 | 10,145 |
| 19,700,475 | 57,497 | 940,531 | 70,833 | 14,116,575 | 278,420 | 106,870,030 | 697,840 | 438,323 | 6,600 | 1,691,341 | 11,547 |
| 19,706,274 | 57,990 | 941,257 | 72,600 | 14,148,800 | 322,250 | 106,947,381 | 773,510 | 438,993 | 6,700 | 1,692,544 | 12,030 |
| 19,711,721 | 54,470 | 941,966 | 70,900 | 14,180,749 | 319,490 | 107,021,490 | 741,090 | 439,593 | 6,000 | 1,693,566 | 10,220 |
| 19,722,454 | 53,665 | 943,251 | 64,250 | 14,242,666 | 309,585 | 107,162,369 | 704,395 | 440,763 | 5,850 | 1,695,663 | 10,485 |
| 19,739,256 | 56,007 | 945,227 | 65,867 | 14,318,083 | 251,390 | 107,355,989 | 645,400 | 442,489 | 5,753 | 1,699,119 | 11,520 |
| 19,749,949 | 53,465 | 946,498 | 63,550 | 14,382,531 | 322,240 | 107,496,780 | 703,955 | 443,815 | 6,630 | 1,701,289 | 10,850 |
| 33,650 | 81,895 | 328,383 | 781,909 | 6,397 | 11,637 |
2007 flowmeters -all-stations separate month worksheets.xls
2010 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,425,517 | 123,265 | 81,325 | 63,991 | 20,400 | 83,711 | 103,900 | 363,921 | 882,367 | 5,627 | 13,543 |
| FEBRUARY | 1,462,759 | 132,866 | 74,793 | 70,879 | 20,400 | 77,500 | 103,327 | 332,371 | 906,362 | 5,456 | 13,156 |
| MARCH | 1,603,009 | 170,328 | 75,607 | 63,240 | 20,400 | 102,840 | 146,865 | 404,526 | 1,071,132 | 5,071 | 19,213 |
| APRIL | 59,434 | 174,279 | 89,043 | 67,148 | 20,400 | 85,455 | 126,703 | 386,665 | 991,262 | 5,303 | 13,956 |
| MAY | 1,317,648 | 145,694 | 87,062 | 54,671 | 20,400 | 63,587 | 86,855 | 355,426 | 836,562 | 5,802 | 11,248 |
| JUNE | 1,225,309 | 126,607 | 78,857 | 70,230 | 20,400 | 57,796 | 67,285 | 353,596 | 802,473 | 5,804 | 11,194 |
| JULY | 1,106,553 | 128,794 | 61,615 | 108,460 | 20,400 | 51,263 | 61,149 | 332,264 | 727,562 | 4,751 | 10,465 |
| AUGUST | 1,053,504 | 149,151 | 61,447 | 107,885 | 20,400 | 47,989 | 59,434 | 324,438 | 683,558 | 5,412 | 8,486 |
| SEPTEMBER | 1,032,377 | 125,642 | 56,133 | 94,124 | 20,400 | 45,339 | 59,940 | 357,186 | 650,049 | 5,465 | 10,401 |
| OCTOBER | 1,241,095 | 136,285 | 49,227 | 79,650 | 20,400 | 33,650 | 81,895 | 328,383 | 781,909 | 6,397 | 11,637 |
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,152,721 | 141,291 | 71,511 | 78,028 | 20,400 | 64,913 | 89,735 | 353,878 | 833,324 | 5,509 | 12,330 |
To West Goshen: 861,891
2010 flowmeters -all-stations separate month worksheets.xlsSUMMARY
[Bar chart showing precipitation in October.]
October Precip. 15.56
Y-Axis (Precip.): 0, 2, 4, 6, 8, 10, 12, 14, 16
X-Axis (snow/rain): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
Legend: October
Monthly Totals 2010 (Jan-Dec)
Monthly Totals
Precip.
16 14 12 10 8 6 4 2 0
Month
1 2 3 4 5 6 7 8 9 10 11 12
Flowmeters Oct. 2010
October
Flow#s
1600000 1400000 1200000 1000000 800000 600000 400000 200000 0
Day of the Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Monthly Totals 2010 Jan-Dec
Flowmeters
2500000 2000000 1500000 1000000 500000 0
Month
January February March April May June July August September October November December
[Handwritten note top right:] 14. SEWER REPORT
a.
TO: Municipal Authority
FROM: Mark Miller
DATE: November 4, 2010
RE: Monthly Report
Meters: The meters were read on a daily basis.
Meters were calibrated during the month of October.
The meter at the Hershey Mill Pump Station was knocked out of service due to flooding.
Allied Control pulled the meter and made repairs and placed back in service.
C.C. Collection: The Public Works Department responded to several calls for missing caps.
R.C. Collection: We located significant INI in the line between Paoli Pike and North Chester Road estimated at 20,000 gallons a day.
We were able to narrow down the INI by the use of portable meters.
We also received odor complaints from the Fair Way Village. The timing on the pumps was changed to alleviate the effluent going septic.
Ridley Creek Plant: The paving of the plant has been completed.
Once the staging area is restored, we will then finish paving the driveway.
Please feel free to call me to go thru the plant.
Complete items for the month:
- Fencing
- Seeded and Strawed
- Storm drains/downspouts all piped PWD
- Side Walks
F:\Data\Shared Data\MUNICIPAL AUTHORITY\monthly report 110410.doc
[Handwritten note top right:] 14. SEWER REPORT
C.
2 pgs
ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company | Artesian Wastewater Management | Artesian Utility Development | Artesian Water Pennsylvania
Artesian Water Maryland | Artesian Wastewater Maryland | Artesian Consulting Engineers
October 19, 2010
Mr. Mark Miller
Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
[Stamp:]
RECEIVED BY: __________
OCT 22 2010
RE: Lockwood Chase Wastewater Treatment Facility
September 2010 Operations Report
Dear Mr. Miller:
The following is the September 2010 monthly operations report for East Goshen Township's Lockwood Chase Wastewater Treatment Facility.
Treatment plant operations were normal during the month of September 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 848,300 gallons, which represents an average daily flow of 28,277 gallons per day.
The influent area operated normally during the month. The communitor unit was in-service continuously and no problems were noted with the unit or its controls. The plant operator was required to remove debris buildup from the unit's housing, the bypass bar screen, and grit from the bottom of the influent chamber on a regular basis. Debris was disposed of via the trash can.
The aeration pond operated normally during the month of September. The pond's color remained greenish throughout the month due to algae growth and there was only minor surface scum buildup. Both floating aerators were in service continuously.
The polishing pond operated normally during the month as well. The pond's color was very green due to algae growth with some moderate buildup of surface duckweed.
The chlorine feed system and chlorine contact tank were operational throughout the month to meet disinfection requirements. Liquid chlorine was added directly to the chlorine contact tank prior to starting the discharge pumps to help minimize odor issues.
664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com
[Handwritten top right:] 2 of 2
The discharge spray system was operational during the month. The discharge pumps were operated in the hand position and alternated for each spray cycle. Spray fields No. 1 through No. 5 were utilized to help minimize odors.
Results of influent, final effluent, and monitoring well samples collected during the month were not available to date, but current permit compliance is expected.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
Tom Horrex
Treatment Plant Operator
C Mr. Dan Barbato, P.E. – Pennoni Associates
2
[Handwritten top right:] FYI
[Stamp:]
RECEIVED BY: __________
OCT 07 2010
REGION I
FALL DINNER MEETING
THURSDAY, NOVEMBER 18, 2010
Doubletree Guest Suites
640 West Germantown Pike
Plymouth Meeting, PA
Cocktails 6:00 P.M. Dinner 7:00 P.M.
Choice of:
Pan Seared Chicken Breast with Champagne & Tarragon Cream
Or
Grilled Filet of Salmon with Orange Ginger Citrus Glaze
Guest Speaker: Steve Hahn: New Residential Fire Sprinkler & Suppression Regulations
Cost $38.00
Prizes from Associates are most welcome and will be acknowledged.
Contact:
Anna Miller Region I Director at 215-205-7746 or ANN525i@aol.com
Please make checks payable to PMAA Region I. RSVP by Friday, November 12. Mail reservations to Anna Miller, 105 Quince Drive, Hatboro, PA 19040. Contact the above number or email with any questions.
Authority or Business: ____________________________________________________
Phone Number: ___________________________________________________________
| Attendees: | Chicken | Salmon |
|---|---|---|
| ____________________________________ | __________ | __________ |
| ____________________________________ | __________ | __________ |
| ____________________________________ | __________ | __________ |
| ____________________________________ | __________ | __________ |
610-692-7171
www.eastgoshen.org
[Stamp top right:] FYI
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
October 28, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Mr. John Cavalli has filed a Zoning Hearing Board Application requesting relief from the side yard setback requirements. Mr. Cavalli proposes to build a two car garage on his property and is requesting 9 feet 4 inches of relief from the 20 foot side yard setback requirement.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Hearing Board applications.
This application is scheduled to be discussed during the meetings outlined below and is subject to change:
November 3, 2010 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm)
November 23, 2010 - Board of Supervisors meeting (7:00 pm)
December 9, 2010 - Zoning Hearing Board (meeting @ 7:30 pm) (Zoning Hearing)
All meetings are held at the Township Building and are open to the public and are subject to change. The variance application is available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-4N\53-4N-38 (1532 Mark Drive)\ZHB Dem Variance 10-2010\1000 foot ltr ZV 10282010.doc
610-692-7171
www.eastgoshen.org
[Stamp top right:] FYI
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
October 28, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Mr. Michael Ivey has filed a Zoning Hearing Board Application appealing the determination of the Zoning Officer. The Township has determined that the property located at 36 Hill Street, West Chester, PA 19382, TPN 53-6G-28, which is owned by Mr. Ivey, is not being used as it was intended. The residential dwelling on the property is being used as a Semidetached dwelling however it has never been approved as such.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Hearing Board applications.
This application is scheduled to be discussed during the meetings outlined below and is subject to change:
November 3, 2010 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm)
November 16, 2010 - Board of Supervisors meeting (7:00 pm)
January 12, 2011 - Zoning Hearing Board (meeting @ 7:30 pm) (Zoning Hearing)
All meetings are held at the Township Building and are open to the public and are subject to change. The variance application is available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
John E. Good, Esq.,
F:\Data\Shared Data\Property Management\53-6g\53-6G-28 (36 Hill St.)\ZHB Appeal\1000 foot ltr ZV 10252010.doc