Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
December 13, 2010
Monday, 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Cost Summary Report; Change Orders – Worth & Co. – additional gate; Other
- RIDLEY CREEK INVOICES a. Fastenal, #PAMAV4919, 11/18/10 $ 2,474.04 b. Highway Materials, #1622530MB, 11/5/10 $ 1,828.36 c. Highway Materials, #11025998MB, 11/05/10 $ 1,841.53 d. Highway Materials, #11026142MB, 10/18/10 $ 260.42 e. Highway Materials, #11026121MB, 11/17/10 $ 1,147.06 f. Worth and Company Inc., #P28001, 11/30/10 $125,000.00 g. Brickhouse Environmental, #5683, 12/01/10 $ 9,947.50 h. Pennoni, #457258, 11/23/10 $ 4,097.75 i. Gawthrop,Greenwood, PC, #84386, 11/30/10 $ 171.00 j. Gawthrop Greenwood, PC #84387, 11/30/10 $ 720.00 k. Gawthrop Greenwood, PC #84078, 10/31/10 $ 720.00 l. Independence Const., #30-00010257, 11/05/10 $ 3,136.40 m. Independence Const., #30-00010259, 11/05/10 $ 4,202.99 n. Power Pro Equip., #P32515, 10/27/10 $ 17.50 o. Ransome Rental, #K0308701, 10/25/10 $ 1,984.00 p. Martin Limestone, #302737, 10/18/10 $ 296.35 q. Martin Limestone, #302735, 11/1/10 $ 299.83 r. Martin Limestone, #303385, 10/25/10 $ 593.57 s. Silvi Concrete, #2122141, 10/21/10 (already approved in Oct. need to be paid) $ 1,552.80 t. Reilly & Sons Inc., #000531, 11/02/10 $ 1,125.21
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES November 8, 2010
- APPROVAL OF INVOICES a. Gawthrop Greenwood, 84385 $ 380.00 b. Pennoni, #457260, 11/23/10 $ 1,785.00 c. Pennoni, #457259, 11/23/10 $ 105.00
- LIAISON REPORTS
- FINANCIAL REPORTS November Report
Monday, December 13, 2010
- 1 -
- Approval of the Final 2011 Budget
- GOALS November Report
- OLD BUSINESS
- NEW BUSINESS West Pikeland Twp. Sewer Capacity Request; Fee Schedule for Year 2011 and Annual Services
- CAPACITY REQUESTS None
- SEWER REPORTS Director of Public Works Report – November 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - 2010; Artesian Ridley Creek Report –2010
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Delivery date |
|---|---|
| November 10, 2010 | January 1, 2011 |
| February 20, 2011 | |
| May 12, 2011 | |
| August 11, 2011 | |
| November 10, 2011 |
Monday, December 13, 2010
- 2 -
Brickhouse Environmental
Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
November 2010
The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:
- 11-1-10 Emails re: Electrical punch list and Division 16 requirement of electrical coordination study. Also w/ Worth's Jeff Bush re: pending change order requests.
- 11-2-10 Late afternoon site visit to review plant operation and conditions.
- 11-3-10 Meeting w/ M. Miller at site to review operations and controls. Review documents in preparation for next morning's meetings.
- 11-4-10 Special meeting at Township Building to discuss pending legal issues.
- 11-4-10 Biweekly progress meeting.
- 11-5-10 Finalize October's Project Manager's report and distribute via email. Compile and review laboratory testing fees fro SBR performance / warranty test period.
- 11-8-10 On site all morning from 6 am troubleshooting suspected power failure occurrences. Main breaker to WWTP tripped and blower #4 VFD had failed and required replacing. Both Worth & Clinger employees on site.
- 11-8-10 Attended and presented at Authority Monthly Meeting.
- 11-9-10 Site visit observation Worth trailer had been removed. Basin #1 planting completed. Walk concreted from control Bldg. to Davco stairs. Pennoni checking electrical punch list progress. Treatment building floor penetrations being sealed. Area N / NW of Screen Building & EQ graded and straw down. Met w/ Pennoni's M. McAloon & S. Seacrist re: power failure issue.
- 11-10-10 Site visit to follow up corrective actions implemented 11-8-10. Review and prepared response to questions raised at 11-8-10 Authority Meeting.
- 11-11-10 Site visit to gather auto dialer alarm info for the new system and forward info to M. Miller. Reviewed lab results and investigated additional lab fees invoiced by O & M contractor.
- 11-12-10 correspondence and coordination w/ Lancaster Lab reps in preparation of the SBR performance warranty testing.
Brickhouse Environmental
- 11-15-10 Site visit to review SBR operations and outline process testing protocols.
- 11-16-10 Site visit to review SBR operations, gather and review process control data. Met w/ Worth's Dwayne and Pennoni's M. McAloon for an update on Mechanical contractor's punch list.
- 11-16-10 Attended Operations and Maintenance bid opening.
- 11-17-10 Site visit to meet reps from Lancaster Lab in prep for SBR performance testing. Reviewed sample locations, procedures and sample pick up times. Towler & Evans met w/ Tom Horrex and Tim Daily to review the present operating conditions of the facility and equipment with respect to the intended design.
- 11-18-10 Reviewed Bob Dina's (Clinger) response regarding the electrical coordination study required as part of the contract. Forwarded comments to R. Smith and copied Pennoni and Dave Evans.
- 11-19-10 Site meeting w/ M. Miller to coordinate placing SBR # 2 into service. SBR # 2 WAS pump check valve was adjusted to allow flow to the SBR for ease of seeding the tank prior to its service.
- 11-23-10 Arrived as requested on site at 5:30 am. Reviewed SBR process control data, PLC set points for the 4 SBR systems and reviewed overall treatment process performance. Tel. con. w/ J. Bush requesting additional explanation and detailing regarding the Authority's decision to disapprove time extensions as a result of the PECO power and Siemens material change alleged delays. Email to Paul Christiansen (Siemens Jet Tech) for guidance for set points and process adjustments.
- 11-29-10 Site visit to update SBR set points. Reviewed operational data from 11-23 thru 11-29.
- 11-30-10 Site visit to review SBR performance and changes with respect to SBR set point changes. Gather and review plant performance data. Updated CO 5, reviewed and distributed the revised PCO 14. Forwarded plant data and questions to P. Christiansen (Siemens) regarding SBR performance and pending adjustments.
Notes:
- Brickhouse's project management involvement was originally anticipated to be completed week 67, ending August 8, 2010 at 1,522 hours.
- Brickhouse's involvement was extended, without need to increase the total contract hours or value to due to Brickhouse being under the original budget. This extension was to week 76, ending October 10, 2010 and
Brickhouse Environmental
attendance at the October 11, 2010 Monthly Authority Meeting. At that time the original budget hours were met.
- Brickhouse's involvement was subsequently extended on a T & M basis until released by the Authority from any further needs.
J:\092532.0\November 2010 Bullets.doc
EGMA 1000
Pennoni
MEMORANDUM
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Daniel Barbato, P.E. Authority Engineer |
| DATE: | December 9, 2010 |
| SUBJECT: | Engineer's Report |
RCSTP Upgrade and Expansion
- Construction phase services have transitioned to punchlist monitoring, final review of operations and maintenance submittals, startup assistance and troubleshooting, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Brickhouse and the Township, and approval of contractor Payment Requests.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth and Company and Clinger Corporation are working on punchlist completion and outstanding items are expected to be complete this month.
- Pennoni has completed review of all Operations and Maintenance submittals for Worth and Clinger and has provided comments back to both contractors.
- Pennoni will support plant performance testing activities as needed.
- Pennoni Design Engineer Tim Daily visited the plant to review the installation and operation compared to the intent of his design. A report was submitted to the Authority with details and recommendations.
I/I Metering Project
- The Township continues to meter flows at selected locations. Meters are in the process of being located to the proposed new locations, and we will review all meter data as it is submitted.
Ridley Creek Consent Order
- The next report is due to DEP in March of 2011. No comments were received to date on the September report submitted to DEP.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\Memo to EGMA Board 2010-12-09.docx
EGMA 1000
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- These documents were provided to the Township for submittal to DEP. The Township received comments from DEP and we are in the process of addressing. We have requested an extension from DEP to complete the response to their comments by the end of February. Several of the DEP comments require that West Goshen adopt resolutions. The extension will allow for time to prepare and submit the resolutions for adoption.
Marydell PS Elimination Planning
- The draft report sections for the Act 537 Plan Revision are being assembled. We anticipate completing the reports in late December or early January. Several notification forms are being completed at this time.
Applebrook Comprehensive Groundwater Evaluation
- Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The report is drafted and will be ready for Township review before the Holiday. No significant issues were identified as a result of the evaluation
West Pikeland Township Sewer Capacity Request
- On August 5, 2010, West Pikeland Township requested East Goshen to consider accepting 20,000 gallons per day of sewage from West Whiteland to facilitate West Pikeland's capacity needs. Our recommendation in response to the request is provided under separate cover.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\Memo to EGMA Board 2010-12-09.docx
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT SUMMARY
December 13, 2010
Includes bills paid at 11/8 meetings
| Name | Budget or Contract amt. | This Month | To Date | Balance on Budget or Contract | % of work completed |
|---|---|---|---|---|---|
| RECEIPTS | |||||
| Bond | $9,500,000.00 | $0.00 | $9,500,000.00 | ||
| Pennoni (rechargable) | $20,000.00 | $0.00 | $20,000.00 | ||
| Grant | $464,195.00 | $0.00 | $464,195.00 | ||
| RECEIPTS TOTAL | $9,984,195.00 | $0.00 | $9,984,195.00 | ||
| EXPENSES | |||||
| Borrowing costs | $52,250.00 | $0.00 | $52,250.00 | $0.00 | 100.00% |
| Worth | $7,865,400.00 | $278,520.50 | $7,645,366.12 | $220,033.88 | 97.20% |
| change orders | $17,523.22 | $0.00 | $0.00 | $17,523.22 | 0.00% |
| Clinger | $974,000.00 | $30,597.44 | $950,777.64 | $23,222.36 | 97.62% |
| change orders | $33,312.24 | $0.00 | $0.00 | $33,312.24 | 0.00% |
| Pennoni (Inspection) (05) | $136,200.00 | $0.00 | $136,197.62 | $2.38 | 100.00% |
| Pennoni (Continued Services) (10) | $177,900.00 | $12,393.25 | $158,702.61 | $19,197.39 | 89.21% |
| Pennoni (Rechargeable) (06) | $20,000.00 | $0.00 | $12,961.75 | $7,038.25 | 64.81% |
| Brickhouse | $175,000.00 | $26,823.75 | $181,626.25 | -$6,626.25 | 103.79% |
| Extras | |||||
| Capital | $440,413.54 | $18,217.71 | $124,463.27 | $315,950.27 | 28.26% |
| Capital (Identified but not paid) | $80,196.00 | $0.00 | $0.00 | $80,196.00 | 0.00% |
| Trailer, Phone, Porta Pot & Internet | $12,000.00 | $305.00 | $11,825.18 | $174.82 | 98.54% |
| EXPENSES TOTAL | $9,984,195.00 | $366,857.65 | $9,274,170.44 | $710,024.56 | 92.89% |
We have identified $41,357 in potential extras.
Retainage (10% until 50% of the project is done then it drops back to 5%)
| Worth | $224,058.22 | 2.5% |
|---|---|---|
| Clinger | $51,794.25 | 5% |
| Total | $275,852.47 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 121310.xls SUMMARY V2
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL
December 13, 2010
| Vendor / Category | Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|---|
| Worth | |||||
| 2/9/2009 | $561,150.00 | Worth & Company | Application #1 | ||
| 3/9/2009 | $480,825.00 | Worth & Company | Application #2 | ||
| 4/9/2009 | $768,780.00 | Worth & Company | Application #3 | ||
| 5/8/2009 | $125,352.90 | Worth & Company | Application #4 | ||
| 5/31/2009 | $485,103.12 | Worth & Company | Application #5 | ||
| 6/30/2009 | $267,975.00 | Worth & Company | Application #6 | ||
| 7/31/2009 | $138,217.50 | Worth & Company | Application #7 | ||
| 8/31/2009 | $679,793.40 | Worth & Company | Application #8 | ||
| 9/30/2009 | $504,310.98 | Worth & Company | Application #9 | ||
| 9/30/2009 | $222,861.55 | Worth & Company | Application #10 (5% retainage) | ||
| 10/31/2009 | $724,089.05 | Worth & Company | Application #11 | ||
| 11/30/2009 | $379,360.17 | Worth & Company | Application # 12 | ||
| 12/31/2009 | $374,772.62 | Worth & Company | Application #13 | ||
| 1/31/2010 | $207,881.86 | Worth & Company | Application # 14 | ||
| 2/28/2010 | $69,077.35 | Worth & Company | Application # 15 | ||
| 3/31/2010 | $75,857.50 | Worth & Company | Application # 16 | ||
| 4/30/2010 | $170,263.75 | Worth & Company | Application # 17 | ||
| 5/31/2010 | $178,290.62 | Worth & Company | Application #18 | ||
| 6/30/2010 | $299,633.25 | Worth & Company | Application #19 | ||
| 7/30/2010 | $426,170.00 | Worth & Company | Application #20 | ||
| 8/31/2010 | $227,050.00 | Worth & Company | Application #21 | ||
| 9/30/2010 | $54,520.50 | Worth & Company | Application 22 | ||
| 10/31/2010 | $224,000.00 | Worth & Company | Application #23 | ||
| $7,645,336.12 | $7,645,336.12 | ||||
| Clinger | |||||
| 4/9/2009 | $22,152.64 | Clinger | Application #1 | ||
| 5/8/2009 | $15,714.77 | Clinger | Application #2 | ||
| 5/31/2009 | $77,973.43 | Clinger | Application #3 | ||
| 6/30/2009 | $12,567.46 | Clinger | Application #4 | ||
| 8/30/2009 | $10,855.98 | Clinger | Application #5 | ||
| 9/30/2009 | $111,255.75 | Clinger | Application #6 | ||
| 10/31/2009 | $59,344.83 | Clinger | Application #7 | ||
| 11/30/2009 | $145,354.05 | Clinger | Application # 8 | ||
| 12/31/2009 | $94,727.00 | Clinger | Application # 9 | ||
| 1/31/2010 | $139,092.94 | Clinger | Application #10 | ||
| 2/28/2010 | $58,514.64 | Clinger | Application #11 | ||
| 2/28/2010 | $41,530.78 | Clinger | Application #12 (5% retainage) | ||
| $13,575.79 | Clinger | Application #13 | |||
| 5/2/2010 | $34,539.38 | Clinger | Application # 14 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls | DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 6/30/2010 | $40,633.52 | Clinger | Application #15 | |
| 8/1/2010 | $42,347.24 | Clinger | Application # 16 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL
DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 8/31/2010 | $30,597.44 | Clinger | Application #17 | |
| $950,777.64 | $950,777.64 | |||
| Pennoni | ||||
| ? | $712.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU ? | |
| 10/30/2008 | $943.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 10/19/08 | |
| 12/5/2008 | $18,115.98 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 11/30/08 | |
| 1/15/2009 | $12,929.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 12/28/08 | |
| 2/5/2009 | $13,352.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $31,288.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $29,010.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $22,436.46 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| 7/29/2009 | $3,528.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 7/19/09 | |
| 12/30/2010 | $16,482.50 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 12/31/10 | |
| 1/29/2010 | $24,224.58 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 1/17/10 | |
| 2/23/2010 | $13,057.00 | PENNONI ASSOCIATES INC. | RCSTP EXP PROJ SERV THRU 2/14/10 | |
| 4/1/2010 | $19,243.40 | PENNONI ASSOCIATES INC. | ||
| 5/5/2010 | $18,810.50 | PENNONI ASSOCIATES INC. | Through 4/18/2010 | |
| 5/25/2010 | $19,287.50 | PENNONI ASSOCIATES INC. | Through 5/16/2010 | |
| 6/29/2010 | $17,901.25 | PENNONI ASSOCIATES INC. | Through 6/20/10 | |
| 7/29/2010 | $17,302.63 | PENNONI ASSOCIATES INC. | Through 7/18/2010 | |
| 8/26/2010 | $12,393.25 | PENNONI ASSOCIATES INC. | Through 8/15/2010 | |
| 9/29/2001 | $12,521.81 | PENNONI ASSOCIATES INC. | through 9/19/2010 | |
| 10/27/2010 | $12,326.15 | PENNONI ASSOCIATES INC. | Through 10/17/2010 | |
| $315,866.97 | $315,866.97 | |||
| Pennoni (rechargeable) | ||||
| 2/5/2009 | $2,840.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 1/25/09 | |
| 3/19/2009 | $4,934.75 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/1/09 | |
| 4/8/2009 | $3,777.00 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 3/29/09 | |
| 5/6/2009 | $1,409.50 | PENNONI ASSOCIATES INC. | RCSTP EXP.PROJ. SERV. THRU 4/26/09 | |
| $12,961.75 | $12,961.75 | |||
| Brickhouse | ||||
| 5/12/2009 | $2,127.50 | BRICKHOUSE | Apr-09 | |
| 6/1/2009 | $8,452.50 | BRICKHOUSE | May-09 | |
| 7/1/2009 | $7,791.25 | BRICKHOUSE | Jun-09 | |
| 8/3/2009 | $9,315.00 | BRICKHOUSE | Jul-09 | |
| 9/1/2009 | $7,762.50 | BRICKHOUSE | Aug-09 | |
| 10/1/2009 | $7,417.50 | BRICKHOUSE | Sep-09 | |
| 11/2/2009 | $7,072.50 | BRICKHOUSE | Oct-09 | |
| 12/1/2009 | $7,963.75 | BRICKHOUSE | Nov-09 | |
| 1/4/2010 | $7,762.50 | BRICKHOUSE | Dec-09 | |
| 2/1/2010 | $7,618.75 | BRICKHOUSE | Jan-10 | |
| 3/1/2010 | $7,417.50 | BRICKHOUSE | Feb-10 | |
| 4/1/2010 | $10,005.00 | BRICKHOUSE | Mar-10 | |
| 5/3/2010 | $11,931.25 | BRICKHOUSE | Apr-10 | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 6/1/2010 | $10,321.25 | BRICKHOUSE | May-10 | |
| 7/1/2010 | $11,845.00 | BRICKHOUSE | Jun-10 | |
| 8/2/2010 | $14,911.25 | BRICKHOUSE | Jul-10 | |
| 9/1/2010 | $14,087.50 | BRICKHOUSE | Aug-10 | |
| 10/1/2010 | $10,695.00 | BRICKHOUSE | Sep-10 | |
| 10/1/2010 | $6,785.00 | BRICKHOUSE | Clinger Matter | |
| 11/1/2010 | $8,826.25 | BRICKHOUSE | Oct-10 | |
| 11/1/2010 | $571.50 | BRICKHOUSE | Clinger Matter | |
| $180,680.25 | $180,680.25 | |||
| Extras - Capital - Paid | ||||
| 12/22/2008 | $44.98 | EAST GOSHEN TOWNSHIP | REIMBURSE GEN.FUND FOR OFFICE DEPOT | |
| 12/31/2008 | $88.00 | FASTSIGNS | RED ON WHITE ALUM. SIGNS | |
| 1/12/2009 | $177.00 | FASTSIGNS | SIGNS - PLEASE AVOID TOWNE DR.... | |
| 12/1/2008 | $36.00 | GREAT VALLEY LOCKSHOP | KEYS FOR CONTRACTOR | |
| 12/8/2008 | $160.80 | GREAT VALLEY LOCKSHOP | PADLOCKS, REKEY CYLINDERS & KEYS | |
| 12/29/2008 | $474.82 | HANSON AGGREGATES INC | 36.95 TONS SUBBASE AGGREGATE | |
| 12/31/2008 | $908.00 | HANSON AGGREGATES INC | 70.66 TONS SUBGRADE 2 AGGREGATE | |
| 12/15/2008 | $2,089.39 | LENNI ELECTRIC CORPORAT | TEMP SERV. FOR TRAILER - RIDLEY CRK | |
| 12/31/2008 | $120.00 | LENNI ELECTRIC CORPORAT | SEWER PLANT - GUY WIRE RELOCATE | |
| 12/29/2008 | $7,865.00 | MACANGA INC. | TRUCK & TRACKHOE RENTAL 12/5-12/18 | |
| 12/1/2008 | $2,466.00 | PATTERSON, MICHAEL J. | MATERIALS & LABOR - SPLIT RAIL FENCE | |
| 12/1/2008 | $4,907.72 | PIPE XPRESS INC. | COPPER TUBING, BRASS COMP. COUPLING | |
| 12/15/2008 | $813.74 | PIPE XPRESS INC. | BURIAL HYDRANT, BRASS CURB STOP, & | |
| 12/29/2008 | $129.00 | RAM-T CORPORATION | 2 FT. SILT FENCE | |
| 12/1/2008 | $1,183.00 | RANSOME RENTAL COMPAN | CATERPILLAR - TRUCK LOADER RENTAL | |
| 12/8/2008 | $3,960.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 11/13-11/25/08 | |
| 12/29/2008 | $908.00 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15 - 12/18/08 | |
| 12/31/2008 | $1,044.85 | RANSOME RENTAL COMPAN | CATERPILLAR RENTAL 12/15-12/16/08 | |
| 12/8/2008 | $119.95 | SAFETY SOLUTIONS INC. | MEDICAL SUPPLIES | |
| 12/1/2008 | $635.60 | US MUNICIPAL SUPPLY INC. | CUSTOM SIGNS - RIDLEY CREEK TREATMT | |
| 12/31/2008 | $157.50 | GAWTHROP GREENWOOD | LEGAL | |
| 1/31/2009 | $936.50 | GAWTHROP GREENWOOD | LEGAL | |
| 3/19/2009 | $1,246.64 | HAMMOND & MCCMLOSY | WATER SERVICE | |
| 3/31/2009 | $1,254.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/2/2009 | $274.21 | PIPE XPRESS INC. | YARD HYDRANT #2 | |
| 4/2/2009 | $1,910.28 | HAMMOND & MCCMLOSY | WATER PIPING | |
| 5/11/2009 | $158.69 | US MUNICIPAL SUPPLY INC. | 3 SIGNS | |
| 4/30/2009 | $264.86 | LENNI ELECTRIC CORPORAT | WIRED HOT WATER HEATER | |
| 5/31/2009 | $133.00 | GAWTHROP GREENWOOD | LEGAL | |
| 6/30/2009 | $304.00 | GAWTHROP GREENWOOD | LEGAL | |
| 7/17/2009 | $1,481.00 | EAST GOSHEN TOWNSHIP | BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE) | |
| 9/10/2009 | $254.85 | AGWAY | TREE STAKES AND PEAT MOSS | |
| 8/25/2009 | $1,855.00 | HARMONY HILL NURSERIES | 16 TREES||
| 8/31/2009 | $836.00 | GAWTHROP GREENWOOD | 2 MONTH LEGAL | |
| 11/19/2009 | $314.00 | VIMCO | SEALER FOR FLOORS | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL
DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 10/31/2009 | $285.00 | GAWTHROP GREENWOOD | LEGAL | |
| 12/31/2010 | $1,414.97 | L/B water | YARD HYDRANT #2 | |
| 12/18/2009 | $443.48 | Grainger | Hose Reel 1 inch | |
| 12/18/2009 | $267.98 | Grainger | Hose Reel 3/4 inch | |
| 2/2/2010 | $789.45 | Fisher Scientific | Lab Equipment | |
| 2/28/2010 | $57.00 | GAWTHROP GREENWOOD | LEGAL | |
| 3/15/2010 | $103.96 | Matthews Ford | Van rental | |
| 3/31/2010 | $275.50 | Grainger | Hose | |
| 3/31/2010 | $247.00 | GAWTHROP GREENWOOD | LEGAL | |
| 4/7/2010 | $70.15 | GREAT VALLEY LOCKSHOP | 6 locks | |
| 4/14/2010 | $641.98 | Grainger | Shelving | |
| 4/15/2010 | $1,127.48 | Continetal Fire & Safety | 3" & 1.75" Hose | |
| 4/16/2010 | $28.58 | Grainger | Phone | |
| 3/17/2010 | $1,092.01 | Water Pollution Biology | Michael Geradi - Talk | |
| 2/22/2010 | $1,104.50 | McNichols | Safety Grating | |
| 5/5/2010 | $1,078.38 | HAMMOND & MCCMLOSY | WATER LINE OFFICE | |
| 5/5/2010 | $270.10 | HAMMOND & MCCMLOSY | Hose fitting in storage room | |
| 5/3/2010 | $2,329.17 | Fisher Scientific | DESICCATOR & OVEN | |
| 5/12/2010 | $1,485.63 | Fisher Scientific | FURNACE | |
| 5/21/2010 | $456.81 | USA Blue book | beakers | |
| 4/29/2010 | $258.00 | Marco | 3 10Lb dry Chem FX | |
| 5/9/2010 | $142.47 | Staples | office equipment | |
| 5/31/2010 | $1,862.00 | GAWTHROP GREENWOOD | Legal | |
| 5/15/2010 | $39,937.70 | Aqua Wastwater Mgt | Sludge from DAVCO | |
| 6/30/2010 | $126.63 | PIPE XPRESS INC. | pipe | |
| 6/15/2010 | $204.40 | GREAT VALLEY LOCKSHOP | locks | |
| 6/8/2010 | $150.00 | O'Rourke and Sons | Bend counter tops | |
| 6/29/2010 | $615.00 | PENNONI | Soda Ash | |
| 7/20/2010 | $99.99 | Office Depot | Printer | |
| 7/16/2010 | $50.39 | Office Depot | Printer cartridge | |
| 7/27/2010 | $649.00 | Newtown Office Supply | Desk | |
| 7/31/2010 | $589.00 | GAWTHROP GREENWOOD | Legal | |
| 6/29/2010 | $193.93 | Fastenal | Chain | |
| 6/29/2010 | $1,019.00 | LENNI ELECTRIC CORPORAT | Lights | |
| 7/12/2010 | $328.70 | HAMMOND & MCCMLOSY | sink | |
| 7/15/2010 | $154.23 | Hach | cable | |
| 7/16/2010 | $347.26 | Hach | Combo | |
| 8/8/2010 | $1,599.97 | Northern | Air Compressor | |
| 8/31/2010 | $1,310.00 | GAWTHROP GREENWOOD | LEGAL | |
| 8/3/2010 | $43.27 | Office Depot | White board | |
| 8/3/2010 | $37.08 | Office Depot | White board | |
| 8/31/2010 | $2,623.51 | PIPE XPRESS INC. | pipe | |
| 9/1/2010 | $465.02 | PIPE XPRESS INC. | pipe | |
| 8/25/2010 | $357.50 | Main Line Concrete | Concrete | |
| 9/30/2010 | $1,242.50 | GAWTHROP GREENWOOD | LEGAL | |
| 10/7/2010 | $665.00 | O'Rourke and Sons | AC stand |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 10/18/2010 | $2,531.00 | Blosenski | Dumpster | |
| 10/13/2010 | ($105.00) | Power Pro | pallet credit | |
| 10/5/2010 | $2,073.90 | Power Pro | block and pallet charge | |
| 10/27/2010 | $17.50 | Power Pro | Re-bar | |
| 10/18/2010 | $577.93 | Martin Limestone | Stone | |
| 10/18/2010 | $296.35 | Martin Limestone | Stone | |
| 10/18/2010 | $299.83 | Martin Limestone | Stone | |
| 10/20/2010 | $270.75 | VIMCO | concrete products | |
| 10/20/2010 | $608.00 | RANSOME RENTAL COMPAN | Cat rental | |
| 10/25/2010 | $1,984.00 | RANSOME RENTAL COMPAN | Rental | |
| 10/5/2010 | $571.88 | Yerkes | PL Survey | |
| 10/23/2010 | $212.40 | Grainger | Door Parts | |
| 9/20/2010 | $88.32 | Yale Electric | Parts | |
| 9/21/2010 | $114.76 | Yale Electric | Parts | |
| 9/17/2010 | $450.00 | Steven Bahnatka | Wall Sign | |
| 9/7/2010 | $4,190.00 | M&S Service | Alarm system | |
| 9/10/2010 | $851.22 | HAMMOND & MCCMLOSY | HW heater | |
| 8/25/2010 | $337.50 | Main Line Concrete | side walks | |
| 9/1/2010 | $465.02 | PIPE XPRESS INC. | Roof Drains | |
| 9/7/2010 | $86.25 | PIPE XPRESS INC. | Water supply | |
| 9/14/2010 | $368.60 | EAST GOSHEN TOWNSHIP | Reimburse GF for Gutter Parts | |
| Total | $110,684.06 | $110,684.06 | ||
| Extras - Capital - Identified capital extras that have not been paid | ||||
| $20,396.00 | Driveway Restoration | |||
| $3,300.00 | Restoration of parking area | |||
| $50,000.00 | Paving at RCSTP (we received a credit from Worth) | |||
| $6,500.00 | Audit | |||
| Total | $80,196.00 | $80,196.00 | ||
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL
DETAIL
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| Trailer, Phone, Porta Potty & Internet | ||||
| 12/15/2008 | $1,039.10 | ACTON MOBILE INDUSTRIES | RENTAL MOBILE OFFICE | |
| 12/22/2008 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - THRU 1/19/09 | |
| 1/21/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 1/20-2/20/09 | |
| 2/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 2/20- 3/20/09 | |
| 3/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 3/20 - 4/19 | |
| 4/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFICE RENTAL - 4/20 - 5/19 | |
| 5/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 5-20 - 6/19 | |
| 6/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | MOBILE OFFCIE RENTAL 6/20 - 7/19 | |
| 7/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 7/20 to 8/19 | |
| 8/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | 8/20/ to | |
| 9/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | ||
| 10/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 11/19 | |
| 11/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | thru 12/19 | |
| 12/10/2009 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 1/19 | |
| 1/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 2/19/10 | |
| 2/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 3/19/10 | |
| 3/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 4/19 | |
| 4/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 5/19 | |
| 5/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 6/19 | |
| 6/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 7/19 | |
| 7/10/2010 | $239.10 | ACTON MOBILE INDUSTRIES | Thru 8/19 | |
| 9/20/2010 | $305.00 | ACTON MOBILE INDUSTRIES | Removal | |
| $6,126.10 | $6,126.10 | |||
| 12/15/2008 | $140.00 | POTTY QUEEN | RENTAL PORTABLE TOILET - RIDLEY CRK | |
| 12/22/2008 | $64.47 | POTTY QUEEN | RENTAL TOILET 12/23-1/10/08 | |
| 2/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 2/8-3/7 | |
| 3/8/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 3/8-4/4 | |
| 4/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET 4/5-5/2 | |
| 5/5/2009 | $95.00 | POTTY QUEEN | RENTAL TOILET ???? | |
| 7/26/2009 | $95.00 | POTTY QUEEN | RENTAL 7/26 TO 8/22 | |
| 8/23/2009 | $95.00 | POTTY QUEEN | Rental 8/23 to 9/19 | |
| 9/20/2009 | $95.00 | POTTY QUEEN | RENTAL 9/20 to 10/17 | |
| 10/18/2009 | $95.00 | POTTY QUEEN | 10/18/09 to 11/14/09 | |
| 11/14/2009 | $95.00 | POTTY QUEEN | 11/15 to 12/13 | |
| 12/13/2009 | $95.00 | POTTY QUEEN | 12/13 to 1/9/10 | |
| 1/10/2010 | $95.00 | POTTY QUEEN | 1/10/10 to 2/6/10 | |
| 2/7/2010 | $95.00 | POTTY QUEEN | 2/7/10 to 3/6/10 | |
| 3/7/2010 | $95.00 | POTTY QUEEN | 3/7 to 4/3 | |
| 4/4/2010 | $95.00 | POTTY QUEEN | 4/4 to 5/1 | |
| 5/2/2010 | $98.80 | POTTY QUEEN | 5/2 to 5/29 | |
| 5/30/2010 | $96.90 | POTTY QUEEN | 5/30 to 6/26 | |
| 6/30/2010 | $96.90 | POTTY QUEEN | 6/27 to 7/24 | |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls
| Date | Amount | Subtotals | Name | Description |
|---|---|---|---|---|
| 7/28/2010 | $96.90 | POTTY QUEEN | 7/25 to 8/21 | |
| $1,923.97 | $1,923.97 | |||
| 12/22/2008 | $174.65 | VERIZON -7041 | NOVEMBER 25 - DECEMBER 6, 2008 | |
| 1/7/2009 | $137.87 | VERIZON -7041 | BILLING DATE 1/07/09 | |
| 2/7/2009 | $130.34 | VERIZON -7041 | BILLING DATE 2/07/09 | |
| 3/7/2009 | $133.97 | VERIZON -7041 | BILLING DATE 3/7/09 | |
| 4/7/2009 | $136.00 | VERIZON -7041 | BILLING DATE 4/7/09 | |
| 5/7/2009 | $137.66 | VERIZON -7041 | BILLING DATE 5/7/09 | |
| 6/7/2009 | $178.47 | VERIZON -7041 | BILLINGDATE 6/7/2009 | |
| 7/7/2009 | $145.21 | VERIZON -7041 | Billing Date 7/7/09 | |
| 8/7/2009 | $134.44 | VERIZON -7041 | Billing Date 8/7/09 | |
| 9/7/2009 | $132.93 | VERIZON -7041 | billing date 9/7/09 | |
| 10/7/2009 | $133.43 | VERIZON -7041 | Billing date 10/7/09 | |
| 11/7/2009 | $133.79 | VERIZON -7041 | Billing Date 11/7/09 | |
| 12/7/2009 | $136.76 | VERIZON -7041 | Billing date 12/7/09 | |
| 1/7/2010 | $135.11 | VERIZON -7041 | Billing date 1/7/10 | |
| 2/7/2010 | $134.35 | VERIZON -7041 | Billing date 2/7/10 | |
| 3/7/2010 | $134.34 | VERIZON -7041 | Billing date 3/7/10 | |
| 4/7/2010 | $134.72 | VERIZON -7041 | Billing date 4/7/10 | |
| 5/7/2010 | $136.37 | VERIZON -7041 | billing ddate 5/7/2010 | |
| 6/7/2010 | $134.06 | VERIZON -7041 | Billing date 6/7/10 | |
| 7/7/2010 | $134.18 | VERIZON -7041 | Billing date 7/7/10 | |
| $2,788.65 | $2,788.65 | |||
| 8/31/2009 | $286.56 | VERIZON | INTERNET (FIRST BILL) | |
| 9/28/2009 | $69.99 | VERIZON | INTERNET | |
| 10/28/2009 | $69.99 | VERIZON | INTERNET | |
| 11/28/2009 | $69.99 | VERIZON | INTERNET | |
| 12/28/2009 | $69.99 | VERIZON | INTERNET | |
| 1/28/2010 | $69.99 | VERIZON | INTERNET | |
| 2/28/2010 | $69.99 | VERIZON | INTERNET | |
| 3/28/2010 | $69.99 | VERIZON | INTERNET | |
| 4/28/2010 | $69.99 | VERIZON | INTERNET | |
| 5/28/2010 | $69.99 | VERIZON | INTERNET | |
| 6/28/2010 | $69.99 | VERIZON | INTERNET | |
| $986.46 | $986.46 | |||
| Trailer, Phone, Porta Potty & Internet Total | $11,825.18 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS
December 13, 2010
| Potential capital extras | ||
|---|---|---|
| Pipe conduit Conflicts | ||
| Controls | $0 | |
| Sludge room retrofit | ||
| HVAC Thermostats | $0 | |
| Cathode Protection | $10,000 | |
| Treatment Tanks | $0 | |
| Electrician (increase in wages) | $20,000 | |
| UV Channel | $11,357 | |
| Total potential extras | $41,357 | $41,357 |
| Potential Receipts | ||
| Total Potential Receipts | $0 | $0 |
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 121310.xls POTENTIAL EXTRAS
EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS
December 13, 2010
| NO. | AMOUNT | APPROVED | WORK | STATUS | PAID |
|---|---|---|---|---|---|
| WORTH | |||||
| 1 | $3,209.70 | 2/24/09 | BLOWER #1 REPAIR | APPROVED | NO |
| 4 | $5,542.80 | 5/11/09 | BLOWER #2 REPAIR | APPROVED | NO |
| ? | $4,617.08 | ???? | BLOWER #3 REPAIR | APPROVED | NO |
| 3 | $2,703.00 | 12/14/09 | ANTI-FLOT COLLAR | APPROVED | NO |
| 5 | $6,784.65 | 12/14/09 | LARGER MIXER FOR FLOC TANK | APPROVED | NO |
| 15 | $4,494.52 | 12/14/09 | REMOVABLE RAILS ON SBR TANK | APPROVED | NO |
| 17 | $6,126.78 | 3/8/10 | BLOWER #4 REPAIR | APPROVED | NO |
| 8 | -$6,250.00 | 3/8/10 | CREDIT FOR CAST IRON PIPE | APPROVED | NO |
| -$20,000.00 | 2/8/10 | Credit for Electric Wages | APPROVED | NO | |
| -$50,000.00 | 2/8/10 | Credit for paving | APPROVED | NO | |
| 9 | $27,702.20 | 5/20/10 | air drops | APPROVED | NO |
| 19 | $3,516.77 | 5/20/10 | 2 doors | APPROVED | NO |
| 20 | $18,094.59 | 5/20/10 | Paint DAVCO WALKWAYS | APPROVED | NO |
| 21 | -$13,875.00 | 5/20/10 | Credit for concrete | APPROVED | NO |
| 22 | $5,932.27 | 6/14/10 | Additional block for sludge building | APPROVED | NO |
| 24 | $6,671.26 | 11/4/10 | Centrifuge Platform | APPROVED | NO |
| 23 | $3,050.21 | 11/4/10 | Fence | APPROVED | NO |
| 25 | $4,703.27 | 11/8/10 | Steel beam in control bldg | APPROVED | NO |
| 12 18 |
$4,499.12 | 1/11/00 | Control Joint Mod in Screen Bldg | APPROVED | NO |
| Total | $17,523.22 | ||||
| CLINGER | |||||
| 1 | $5,106.00 | Denied | EXTEND 34 KV LINES | DENIED | NO |
| 2 | $23,585.00 | 7/1/09 | CORNER UNIT FOR MCC SERVICE DISCONNECT |
APPROVED | NO |
| 3 | $3,171.00 | 4/12/10 | Applebrook Pump | APPROVED | NO |
| 4 | $1,451.24 | 3/23/10 | Cables for 2 chart recorders | APPROVED | NO |
| Total | $33,313.24 | ||||
F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 121310.xls CHANGE ORDERS
Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com
November 30, 2010
Mr. Dan Postlewaite
Pennoni
One Drexel Plaza
3001 Market Street
Philadelphia, PA 19104
Re: Ridley Creek Sewage Treatment Plant Upgrade & Expansion
Pennoni Project# EGMA 0707
Concrete and Steel Pier for Centrifuge
PCO-26
Dear Mr. Postlewaite,
Please find attached our cost estimate sheet showing our cost of One Thousand Four Hundred Nine Dollars and Forty-Four cents ($1,409.44) to add 1 additional 12' gate in the new fence.
An extension of time of (0) days is required.
This change proposal covers only the direct cost associated with the change order work described above. We reserve the right to assess the impact of this change order at a later date and to submit these costs as they become known.
Please issue a change order for this work as soon as possible.
If you should have any questions or require additional information please do not hesitate to contact me.
Sincerely,
Jeffrey Bush
Project Manager
Cc: File
Fred Papiernik, Worth and Company
Frank Ciufo, Pennoni
[Handwritten note: ok RS 11/7/10]
| PROJECT: | Ridley Creek WTP | ESTIMATOR: | JCB | ITEM NO: | PCO -26 |
|---|---|---|---|---|---|
| TYPE OF WORK: | Additional Fence | DATE: | 11/30/2010 | SHEET NO: | 1 |
| DESCRIPTION | QUANTITY | EQUIPMENT | PERMANENT MATERIALS | LABOR | SUB CONTRACTS | TOTAL DIRECT COST | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| U.P. | TOTAL | U.P. | TOTAL | U.P. | TOTAL | U.P. | TOTAL | U.P. | TOTAL | ||
| Supply and install 1 additional 12' gate | 995.00 | $995.00 | |||||||||
| Project Management | 1 HR | 90 | 90 | $90.00 | |||||||
| Estimating / Engineering | 1 HR | 75 | 75 | $75.00 | |||||||
| Site Supervision / Foremen | 1 HR | 72 | 72 | $72.00 | |||||||
| Foremen's Vehicle | 1 HR | $0.00 | |||||||||
| Administrative | 2 HR | 42 | 84 | $84.00 | |||||||
| SUBTOTAL | $0.00 | $0.00 | $321.00 | $995.00 | $1,316.00 | ||||||
| 0% | $0.00 | ||||||||||
| 15% | $0.00 | ||||||||||
| 5% | $16.05 | ||||||||||
| 5% | $49.75 | ||||||||||
| $0.00 | $0.00 | $337.05 | $1,044.75 | $1,381.80 | |||||||
| Bond 2% | $27.64 | ||||||||||
| Total | $1,409.44 | ||||||||||
Rick Smith
| From: | Scott_Towler@URSCorp.com |
|---|---|
| Sent: | Tuesday, November 30, 2010 4:08 PM |
| To: | rsmith@eastgoshen.org; mmiller@eastgoshen.org |
| Cc: | dbarbato@pennoni.com; devans@brickhouse-environmental.com; jyahraes@aol.com |
| Subject: | Revised PCO-14 |
| Attachments: | 12' Gate.pdf |
Rick,
Please refer to the attached PCO-14. The cost was reduced to $1,409.44.
The actual gate was $995.00 and the PM, Supervision and 10% mark up to bring the cost to $1,409.44 is in order.
I suggest adding this to change order 5 for the Board's approval at the December 13th meeting (change order 5 presently includes PCOs 12 & 13 - steel as approved at the November Authority meeting).
Scott A. Towler, PE, SEO, LO
Water/Wastewater Program Manager
URS Corporation
335 Commerce Drive, Suite 300
Fort Washington, PA 19034-2720
Tel: 215.367.2500
Direct: 215.367.2581
Mobile: 484.401.4198
Fax: 215-367-1000
scott_towler@urscorp.com
This e-mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies.
----- Forwarded by Scott Towler/FtWashington/URSCorp on 11/30/2010 03:54 PM -----
| Jeff Bush <JBush@worthandcompany.com> | To "Scott_Towler@URSCorp.com" <Scott_Towler@URSCorp.com> |
|---|---|
| 11/30/2010 03:42 PM | cc |
| Subject |
Scott,
This CO would take the place of the PCO with the man gates added also. This is for only the additional 12' gate back by the Screen Building.
Any questions please do not hesitate to contact me.
Thanks,
1
Jeff
Jeffrey Bush
Project Manager
Worth and Company,Inc.
6263 Kellers Church Road
Pipersville, PA. 18947
Ph: 267-362-1100
Fx: 267-362-1130
Cell: 215-669-6879
Email: JBush@worthandcompany.com
2
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 6, 2010
Dear Resident,
The expansion of the treatment plant has been completed. The only outstanding item is the removal of the temporary parking area which is scheduled to be removed by the end of the year. Once that is removed we will restore all disturbed areas.
On behalf of the Municipal Authority I would personally like to thank-you for your patience during the construction. Should you have any questions regarding to the new operation please don't hesitate to contact me at 610-692-7171.
Sincerely,
Mark S. Miller
Director of Public Works
East Goshen Township
F:\Data\Shared Data\Public Works Dept\Ridley Creek\Ltr. for residents for completion on sewer plant 2010 December 6.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 2, 2010
To: Municipal Authority
From: Mark
Re: Landscape Screening
I would like to complete the landscaping between the SBR tanks and the homes backing up to the plant.
The cost would be $1,250.00, Public Works will plant the tree’s.
F:\Data\Shared Data\Public Works Dept\Municipal Authority\memo to municipal authority for landscape screening 2010 December 2.doc
Pennoni
MEMORANDUM
TO: Dan Barbato
FROM: Tim Daily
DATE: November 23, 2010
SUBJECT: East Goshen Township Ridley Creek WWTP Walk Through, Wednesday, November 17, 2010
1.0 INTRODUCTION
Tim Daily and Tom Horrex completed a walkthrough of the East Goshen system. The purpose of the walk through was to review the treatment plant function and operation. We were periodically joined by Scott Towler.
2.0 GENERAL COMMENTS
Listed below are general comments. Each indivual part of the process is discussed in additional detail below.
The plant is being operated consistent with the design intent with these exceptions.
- Alkalinity in the form of sodium bicarbonate solution is not being added to the influent channel. (Appears to be a kinked hose)
- The sodium bicarbonate metering pump is not being flow paced. (4-20 mA connection appears not to have been made)
- The influent pumps are cycling on and off. VFD control of the influent sump liquid level is not occurring.
- The SBR mixed liquor level seem elevated for the current organic load. (Sludge wasting has been increased to bring solids down)
- The UV channel has overflowed and the UV modules have over topped.
- Decanter actuator mechanism seems to move too quickly and can overload SBR influent.
More operator training in the SBR process is required so that the operators have a better handle on the day to day adjustments that need to be made.
Many of the problems that were identified are associated with the system controls. Now that the system has been running, time needs to be invested into the system so that any controls problems can be identified and either tuned or adjusted with existing controls or add additional programming. For example, Tom Horrex recommended adding a delay timer to the start of sludge digester decanting.
Many of the system alarms are disabled.
C:\Users\nmonaghan\Documents\Memo.docx
1
3.0 SCREEN BUILDING
There is a build-up of grit in the Influent Channel upstream of the grinder.
If the grinder is lifted, the water velocity upstream of the screen greatly increases.
The screen is capturing about a ½ bag per day of material.
It appears that there is a malfunctioning ultrasonic transmitter. JWC is in the process of addressing.
4.0 INFLUENT PUMPS
The Influent Control Panel is not alarming the Autodialer
The influent pumps are not running in level control. They are currently are operating with on/off control.
It appears that the Influent Pump #2 check valve lever needs to be adjusted. There is some water hammer when the pump turns off. The VFD ramp down could also be adjusted.
The Influent Pumps are not maintaining a liquid level in the wet well. They seem to be cycling on and off.
5.0 SODA ASH FEED
The Influent Soda Ash pump is not working. Tom reports that the Marlow representative claimed that the pump was working correctly and that the 4-20 mA signal to drive the pump was not installed or working properly.
The existing diaphragm pump does not seem to be pumping. The level in the tank is not receding with time. This started to occur after the flexible PVC tubing was installed in the carrier tube.
It is suspected that the tubing kinked as it went through the carrier pipe, which has formed a blockage and is preventing the soda ash solution from flowing through the tubing.
6.0 SBR
A number of the equipment elapse timers are not working
The HMI software seems to have gaps in data collection. When a trend is shown on the computer screen there are periods of time where the trend is black and no trend lines are shown. The black areas are similar in appearance as future time, which has no data.
Two of the five blower VFD’s have failed. The GE service tech was investigating the problem during the walk through. It was determined that there is a loose wire in the VFD which shorted causing the failure. It was suggested that the other three VFD’s be checked.
Jet mixer pump cable collects rags, which does not let the grab fitting to slide down a thin cable and hook the pump . Township will change out the thin cable with either dedicated chain or cables.
7.0 SBR OPERATION
The SBR is experiencing foaming. The foam has changed in recent months to a dark foam to a lighter color foam.
Tom’s assessment of a sample of settled mixed liquor is that it is old sludge looked old.
Tom also thinks that the sludge is over aerated. The aeration of the basins will be cut back.
C:\Users\nmonaghan\Documents\Memo.docx
2
Scott reported Mixed liquor levels of around 3,000 mg/l. Given the current loading, 3,000 mg/l mixed liquor, and three SNR’s on line, one would suspect that the sludge age is old and the volatile content is down. This will cause foaming, pin floc, bulking settled sludge, and discoloration. Scott is beginning to waste more sludge. We suspect that a target mixed liquor level is between 2,000 and 2,500 mg/l.
A 1 liter sludge sample settled to approximately 500 ml in 20 minutes. Within the next 20 minutes it all floated to the top. This is an indication of denitrification. Siemens is indicating that it is trapped air and not denitrification.
Tom believes that the operators need additional training in the inner workings of the Jet Tech system.
The SBR alum feed delay is 30 minutes. The timer range should be expanded so that alum could be feed near the end of the react step.
SBR Alum Feed Pump does not function. Clinger and the Marlow Watson chemical pump tech think that traced the wiring and believe that the problem is in the Siemens panel.
8.0 FILTER FEED PUMPS
The filter feed pumps were operating at 300 GPM, 40% speed, and 4.5 ft of water
The Filter Feed pumps need to be removed to check oil.
The Filter feed pump PID controllers are experiencing controller wind-up. When the pumps start the output to the pump’s VFD is 100%, which causes a whoosh of water. A bumpless transfer should be incorporated into the logic to make the operation smoother.
The operation intent of the filter panel design was reviewed. The pumps will operate at a set flow rate from low level to mid level. If the level in the tank should rise about the mid level point, the flow rate will be increase proportionately to the tank level. At high tank level, the pumps will be operating at maximum flow.
There is a question concerning the setting of a maximum flow rate. With two pumps running near maximum output, the flow can over whelm the UV channel. The operators requested a maximum flow rate set point. This rate would be 3.0 MGD or 2,083 GPM. Adjustments were made to the flow and level set points so that the pumps will react sooner to an increase in influent flow.
9.0 FILTERS
The SBR is currently producing effluent with phosphorous concentrations of less than 2 ppm.
The intended operation of the SBR / filter alum and polymer feed was reviewed. Alum should be added to the SBR at the near the end of the react step, so that as much phosphorous can be taken in by the phosphorous bacteria. The ratio is typically 1 pound of phosphorous to 2 pounds of aluminum. This will typically reduce the phosphorous concentration to between 0.7 and 0.8 PPM. Alum is now added to filter feed upstream of the floc tank at a ratio of 1 pound of phosphorous to 5 pounds of aluminum. This loading typically drives down the phosphorous concentration to below 0.5 ppm.
The filters will initiate a backwash cycle based on either high level in the tank or time. The time is currently set to backwash every 120 minutes. Aqua suggests increasing the time to 240 minutes.
C:\Users\nmonaghan\Documents\Memo.docx
3
The filter alarms have been turned off because there have been a number of nuisance alarms.
10.0 UV CHANNEL
The UV channel has over flowed and the UV modules have overtopped at high flows.
The UV finger weirs do not become swamped at these higher flow rates.
The rated flow for the unit is 3.0 MGD or 2,083 GPM.
The flow rate, at which over tops the UV modules, has not been quantified.
There is a distribution plate which the last row of holes was half covered at 820 GPM.
The Filter Feed Pumps need to have a maximum flow set point so that the flow through the UV can be maintained at or below their rating
11.0 SLUDGE DIGESTER
There is confusion on the operation of the Decanting mechanism.
There are reports that a high rate of decant has caused the SBR to go into a Fill/Decant treatment cycle.
The design intent is that the decant time duration is the sum of operator selected decant on time and off time. The decanter moves down in this step wise fashion until low level is hit. This allows the decanter to move through the decant height in small increments so that the flow rate is controlled.
Looking at the decant graphic, it looked like the controls may have been set-up as intended. There is a duration setting for decanting and a starting height and an ending height. The current operation should be compared to the intended operation.
It was suggested that a delay timer be added to the decant screen so that decant could be delayed to the early morning hours.
12.0 RECOMMENDATIONS
Need to check all the alarms and autodialer for proper function and reporting
Get sodium bisulfate pump working
Replace alkalinity tubing with either hose or a more ridged tubing.
Check SBR Blower VFD’s for loose wires
Determine sludge digester pump flow
Characterize filter feed pumping for one pump and two pump operation
Determine if a maximum two pumps running pump speed is required
Review PLC logic and equipment operation with programmer and engineer for these processes:
- Influent Feed pumps
- Sodium Bicarbonate Pumps
- Filter Feed Pumps
- Sludge Decanter
Determine cause of SBR HMI data gaps
Change Filter Feed Pump PID loop programming to include anti-wind-up feature.
C:\Users\nmonaghan\Documents\Memo.docx
4
Start adding alum to SBR
Add longer on delay timer from SBR alum addition
Increase timed backwash interval to 240 minutes
Investigate UV channel height when Filter Feed Pumps are running at 2,083 GPM.
Multiple decants may need to be stored so that a long enough run time can be investigated.
Add sludge decanter delay on timer
C:\Users\nmonaghan\Documents\Memo.docx
5
FASTENAL
Remit to:
Fastenal Company
P.O. Box 1286
Winona, MN 55987-1286
For billing questions:
30 Three Tun Road, Suite 3
MALVERN, PA 19355
United States
Phone (610)-648-9278
Fax (610)-648-9285
INVOICE
Page 1 of 1
Date: 11/18/2010
Invoice No.: PAMAV4919
Due Date: 12/18/2010
Invoice Total: 2,474.04 USD
Cust. No.: PAMAV0136
Cust. P.O.:
Job No.: ridley creek pl
Sold To:
E. GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
Ship To:
E. GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6199
[Handwritten: 27239]
This Order and Document is subject to the "Terms of Purchase" posted on www.fastenal.com.
| Line No | Quantity Ordered | Quantity Shipped | Quantity Backordered | Description | Control No. | Part No. | Price / Hundred | Amount |
|---|---|---|---|---|---|---|---|---|
| 1 | 8 | 8 | 0 | SS C PIN 3/8X2 | 120080739 | 0120672 | 288.0000 | 23.04 |
| 2 | 200 | 200 | 0 | 3/8" 304 S/S PROOF C | MLPA0375 | 12535-00245 | 1,200.0000 | 2,400.00 |
*** Fastenal now has the ability to email or fax invoices. To enroll please call 866-880-3278.
APPROVED BY: [Signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-7454
[Handwritten: Pump chain.]
[Handwritten: Ok RS 12/15]
Received By:
Comments:
Contact: MARK MILLER
Tax Exemption: 7771 G
| Subtotal | 2,423.04 |
|---|---|
| Shipping & Handling | 51.00 |
| PA State Tax | 0.00 |
| County Tax | 0.00 |
| City Tax | 0.00 |
| Total | 2,474.04 |
Reasonable collection and attorneys fees will be assessed to all accounts placed for collection.
No materials accepted for return without our permission. All discrepancies must be reported within 10 days.
Please pay from this invoice.
If you re-package or re-sell this product, you are required to maintain integrity of Country of Origin to the consumer of this product.
Invoice: PAMAV4919 Cust: PAMAV0136
3-01-0009227
Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454
|
Bill To: 658 EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
Job: Miscellaneous |
|---|
Invoice: 1622530MB Plant: MALVERN BLACKTOP Page 1 of 1
| Project No | Invoice Date | Purchase Order | Payment Terms |
|---|---|---|---|
| MISCELLA | 11/05/10 | NET 30 |
| Date | Ticket | Product | Quantity | U/M | Unit Price | Tax | Total |
|---|---|---|---|---|---|---|---|
| 11/05 | 00202021 | 19MM B .3<3 V P | 10.0060 | TONS | 45.7000 | 0.00 | 457.27 |
| 11/05 | 00202028 | 19MM B .3<3 V P | 10.0140 | TONS | 45.7000 | 0.00 | 457.64 |
| 11/05 | 00202037 | 19MM B .3<3 V P | 10.0090 | TONS | 45.7000 | 0.00 | 457.41 |
| 11/05 | 00202041 | 19MM B .3<3 V P | 9.9790 | TONS | 45.7000 | 0.00 | 456.04 |
Product Summary
| Product | Description | Quantity | UOM |
|---|---|---|---|
| 1061303 | 19MM B .3<3 V P | 40.0080 | TONS |
[Handwritten: OK TJ]
| Material | Transp. | Misc. | Tax | Invoice Amt | Receipt Amt | Balance Due |
|---|---|---|---|---|---|---|
| $1,828.36 | $0.00 | $0.00 | $0.00 | $1,828.36 | $0.00 | $1,828.36 |
Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454
|
Bill To: 658 EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
Job: Miscellaneous |
|---|
Invoice: 11025998MB Plant: DOWNINGTOWN ASPHALT Page 1 of 1
| Project No | Invoice Date | Purchase Order | Payment Terms |
|---|---|---|---|
| MISCELLA | 11/05/10 | NET 30 |
| Date | Ticket | Product | Quantity | U/M | Unit Price | Tax | Total |
|---|---|---|---|---|---|---|---|
| 11/05 | 00285323 | ID2B | 10.0830 | TONS | 45.5000 | 0.00 | 458.78 |
| 11/05 | 00285331 | 19MM B .3<3 | 9.9480 | TONS | 46.1500 | 0.00 | 459.10 |
| 11/05 | 00285338 | 19MM B .3<3 | 9.9980 | TONS | 46.1500 | 0.00 | 461.41 |
| 11/05 | 00285343 | 19MM B .3<3 | 10.0160 | TONS | 46.1500 | 0.00 | 462.24 |
Product Summary
| Product | Description | Quantity | UOM |
|---|---|---|---|
| 1010201 | ID2B | 10.0830 | TONS |
| 1011303 | 19MM B .3<3 | 29.9620 | TONS |
[Handwritten: OK TJ]
| Material | Transp. | Misc. | Tax | Invoice Amt | Receipt Amt | Balance Due |
|---|---|---|---|---|---|---|
| $1,841.53 | $0.00 | $0.00 | $0.00 | $1,841.53 | $0.00 | $1,841.53 |
Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454
|
Bill To: 658 EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
Job: Miscellaneous |
|---|
Invoice: 11026142MB Plant: DOWNINGTOWN ASPHALT Page 1 of 1
| Project No | Invoice Date | Purchase Order | Payment Terms |
|---|---|---|---|
| MISCELLA | 11/18/10 | NET 30 |
| Date | Ticket | Product | Quantity | U/M | Unit Price | Tax | Total |
|---|---|---|---|---|---|---|---|
| 11/18 | 00285963 | 9.5MM .3<3 | 5.0080 | TONS | 52.0000 | 0.00 | 260.42 |
Product Summary
| Product | Description | Quantity | UOM |
|---|---|---|---|
| 1011110 | 9.5MM .3<3 | 5.0080 | TONS |
[Handwritten: OK TJ]
| Material | Transp. | Misc. | Tax | Invoice Amt | Receipt Amt | Balance Due |
|---|---|---|---|---|---|---|
| $260.42 | $0.00 | $0.00 | $0.00 | $260.42 | $0.00 | $260.42 |
Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454
|
Bill To: 658 EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
Job: Miscellaneous |
|---|
Invoice: 11026121MB Plant: DOWNINGTOWN ASPHALT Page 1 of 1
| Project No | Invoice Date | Purchase Order | Payment Terms |
|---|---|---|---|
| MISCELLA | 11/17/10 | NET 30 |
| Date | Ticket | Product | Quantity | U/M | Unit Price | Tax | Total |
|---|---|---|---|---|---|---|---|
| 11/17 | 00285852 | ID3 | 9.9820 | TONS | 47.9000 | 0.00 | 478.14 |
| 11/17 | 00285853 | ID3 | 9.9750 | TONS | 47.9000 | 0.00 | 477.80 |
| 11/17 | 00285881 | ID3 | 3.9900 | TONS | 47.9000 | 0.00 | 191.12 |
Product Summary
| Product | Description | Quantity | UOM |
|---|---|---|---|
| 1010402 | ID3 | 23.9470 | TONS |
[Handwritten: Ok RS]
| Material | Transp. | Misc. | Tax | Invoice Amt | Receipt Amt | Balance Due |
|---|---|---|---|---|---|---|
| $1,147.06 | $0.00 | $0.00 | $0.00 | $1,147.06 | $0.00 | $1,147.06 |
Application and Certificate For Payment
Page 1
|
To Owner: East Goshen Municipal Authorit 1580 Paoli Pike West Chester, PA 19380 |
Project: Ridley Creek WWTP 1751 Towne Road Fred Papiernik 267-278-6108 West Chester, PA 19380 |
Application No: 24 Period To: 11/30/10 Architect's Project No: Contract Date: 10/22/08 |
Date: 11/30/2010 |
|---|---|---|---|
|
From (Contractor): Worth and Company, Inc. 6263 Kellers Church Road Pipersville, PA 18947 Phone: 267 362-1100 |
Contractor Job Number: P28001 Via (Architect): Contract For: |
||
Contractor's Application For Payment
| Original contract sum | 7,865,400.00 |
|---|---|
| Net change by change orders | 4,024.34 |
| Contract sum to date | 7,869,424.34 |
| Total completed and stored to date | 7,869,424.34 |
| Retainage 1.3% of completed work: 99,058.22 0.0% of stored material: 0.00 |
|
| Total retainage | 99,058.22 |
| Total earned less retainage | 7,770,366.12 |
| Less previous certificates of payment | 7,645,366.12 |
| Current payment due | 125,000.00 |
| Balance to finish, including retainage | 99,058.22 |
Change Order Summary
| Change orders approved in previous months by owner | Additions | Deductions |
|---|---|---|
| Approved in previous months | 46,672.59 | -42,648.25 |
| Approved this month | ||
| Totals | 4,024.34 | |
| Net change by change orders | 4,024.34 | |
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief the work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
Contractor: [Signature: Ann Bowman] Date: 12/02/10
State of: PA County of: Bucks
Subscribed and sworn to before me this 2nd day of December 2010 (year).
Notary Public: [Signature: Linda D. Nelson]
My commission expires: [Notarial Seal: Linda D. Nelson, Notary Public, Plumstead Twp., Bucks County, My Commission Expires Sept. 19, 2014]
[Handwritten: OK RS 12/10]
Architect's Certificate for Payment
In accordance with the Contract Documents, based on on-site observations and the data comprising the above application the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.
Amount Certified: $ 125,000
Architect: [Signature: Dan Barbato] Date: 12/7/10
This Certification is not negotiable. The Amount Certified is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.
Application and Certificate For Payment -- page 2
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| CO-001 | Blower Repairs | 3,209.70 | 3,209.70 | 0.00 | 0.00 | 3,209.70 | 100.00 | 0.00 | 40.40 | |
| CO-001A | Anit Flotation Collar | 2,703.00 | 2,703.00 | 0.00 | 0.00 | 2,703.00 | 100.00 | 0.00 | 34.02 | |
| CO-001B | Blower 2 repairs | 5,542.80 | 5,542.80 | 0.00 | 0.00 | 5,542.80 | 100.00 | 0.00 | 69.77 | |
| CO-001C | Top Entry Mixer change | 6,784.65 | 6,784.65 | 0.00 | 0.00 | 6,784.65 | 100.00 | 0.00 | 85.40 | |
| CO-001D | SBR Handrail | 4,494.52 | 4,494.52 | 0.00 | 0.00 | 4,494.52 | 100.00 | 0.00 | 56.58 | |
| CO-001E | Blower 3 Repairs | 4,617.08 | 4,617.08 | 0.00 | 0.00 | 4,617.08 | 100.00 | 0.00 | 58.12 | |
| CO-001F | Paving Credit | -50,000.00 | -50,000.00 | 0.00 | 0.00 | -50,000.00 | 100.00 | 0.00 | -629.39 | |
| CO-001G | SBR Wall Credit | -20,000.00 | -20,000.00 | 0.00 | 0.00 | -20,000.00 | 100.00 | 0.00 | -251.75 | |
| CO-002 | PVC Credit Lieu of Cast Iron | -6,250.00 | -6,250.00 | 0.00 | 0.00 | -6,250.00 | 100.00 | 0.00 | -78.67 | |
| CO-002A | Concrete Wall @ UV Channel | 11,357.25 | 11,357.25 | 0.00 | 0.00 | 11,357.25 | 100.00 | 0.00 | 142.96 | |
| CO-002B | Blower 4 Repairs | 6,126.78 | 6,126.78 | 0.00 | 0.00 | 6,126.78 | 100.00 | 0.00 | 77.12 | |
| CO-003 | (24) Air Drops | 27,702.20 | 27,702.20 | 0.00 | 0.00 | 27,702.20 | 100.00 | 0.00 | 348.71 | |
| CO-003A | New Doors | 3,516.77 | 3,516.77 | 0.00 | 0.00 | 3,516.77 | 100.00 | 0.00 | 44.27 | |
| CO-003B | Paint Digester Walkway | 18,094.59 | 18,094.59 | 0.00 | 0.00 | 18,094.59 | 100.00 | 0.00 | 227.77 | |
| CO-003C | Digester Concrete Credit | -13,875.00 | -13,875.00 | 0.00 | 0.00 | -13,875.00 | 100.00 | 0.00 | -174.65 | |
| Subtotal | 4,024.34 | 4,024.34 | 0.00 | 0.00 | 4,024.34 | 100.00 | 0.00 | 50.66 | ||
| G1-000 | Site Work & Yard Piping | |||||||||
| G1-001 | Bonds | 160,000.00 | 160,000.00 | 0.00 | 0.00 | 160,000.00 | 100.00 | 0.00 | 2,014.04 | |
| G1-002 | Insurance | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 629.39 | |
| G1-003 | Mobilization | 100,000.00 | 100,000.00 | 0.00 | 0.00 | 100,000.00 | 100.00 | 0.00 | 1,258.77 | |
| G1-004 | Pre-Planning/Schedule | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G1-005 | Submittals - Dutchland | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G1-006 | Submittals - Jet Tech | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G1-007 | E & S Controls | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G1-008 | Strip Topsoil | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 629.39 | |
| G1-009 | Temporary Seed | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 62.94 |
Application and Certificate For Payment -- page 3
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G1-010 | Bioretention Basin 1 | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G1-011 | Bioretention Basin 2 | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G1-012 | Temporary Fence | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 113.29 | |
| G1-013 | Influent Force Main | 85,000.00 | 85,000.00 | 0.00 | 0.00 | 85,000.00 | 100.00 | 0.00 | 1,069.96 | |
| G1-014 | Filter Feed Force Main | 85,000.00 | 85,000.00 | 0.00 | 0.00 | 85,000.00 | 100.00 | 0.00 | 1,069.96 | |
| G1-015 | Filter Effluent | 55,000.00 | 55,000.00 | 0.00 | 0.00 | 55,000.00 | 100.00 | 0.00 | 692.33 | |
| G1-016 | System Effluent | 55,000.00 | 55,000.00 | 0.00 | 0.00 | 55,000.00 | 100.00 | 0.00 | 692.33 | |
| G1-017 | Filter Feed Pump Suction | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G1-018 | Filter Feed Pump Discharge | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G1-019 | Flocculation Tank to Filters | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 629.39 | |
| G1-020 | 4" WAS | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 566.45 | |
| G1-021 | Yard Drain | 70,000.00 | 70,000.00 | 0.00 | 0.00 | 70,000.00 | 100.00 | 0.00 | 881.14 | |
| G1-022 | Sludge Pump Suction | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G1-023 | Relocate Air Lines | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G1-024 | Influent | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 566.45 | |
| G1-025 | Utility Water | 75,000.00 | 75,000.00 | 0.00 | 0.00 | 75,000.00 | 100.00 | 0.00 | 944.08 | |
| G1-026 | Apple Brook Discharge | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G1-027 | PVC Chemical Carrier Pipe | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G1-028 | Potable Water | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 566.45 | |
| G1-029 | 8" Underdrain | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 503.51 | |
| G1-030 | 1" Compressed Air | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G1-031 | Sidewalks | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G1-032 | VOID | |||||||||
| G1-033 | VOID | |||||||||
| G1-034 | Block | 1,000.00 | 1,000.00 | 0.00 | 0.00 | 1,000.00 | 100.00 | 0.00 | 12.59 | |
| G1-035 | Chain Link Fence | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 377.63 |
Application and Certificate For Payment -- page 4
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G1-036 | Demo Existing Fence | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| Subtotal | 1,345,000.00 | 1,345,000.00 | 0.00 | 0.00 | 1,345,000.00 | 100.00 | 0.00 | 16,930.52 | ||
| G2-000 | Pump Station & Valve Vault | |||||||||
| G2-001 | Excavate Pump Station | 52,000.00 | 52,000.00 | 0.00 | 0.00 | 52,000.00 | 100.00 | 0.00 | 654.56 | |
| G2-002 | Install Precast Pump Station | 68,000.00 | 68,000.00 | 0.00 | 0.00 | 68,000.00 | 100.00 | 0.00 | 855.97 | |
| G2-003 | Install Anti-Flotation Collar | 3,500.00 | 3,500.00 | 0.00 | 0.00 | 3,500.00 | 100.00 | 0.00 | 44.06 | |
| G2-004 | Backfill Pump Station | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 151.05 | |
| G2-005 | Excavate Valve Vault | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G2-006 | Install Valve Vault | 28,000.00 | 28,000.00 | 0.00 | 0.00 | 28,000.00 | 100.00 | 0.00 | 352.46 | |
| G2-007 | Backfill Valve Vault | 7,500.00 | 7,500.00 | 0.00 | 0.00 | 7,500.00 | 100.00 | 0.00 | 94.41 | |
| G2-008 | Painting | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 113.29 | |
| G2-009 | Pipe/Valves/Fittings | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G2-010 | Influent Pumps | 65,000.00 | 65,000.00 | 0.00 | 0.00 | 65,000.00 | 100.00 | 0.00 | 818.20 | |
| Subtotal | 275,000.00 | 275,000.00 | 0.00 | 0.00 | 275,000.00 | 100.00 | 0.00 | 3,461.64 | ||
| G3-000 | Screen Building | |||||||||
| G3-001 | Excavate Screen Bldg; Elev 13' | 38,000.00 | 38,000.00 | 0.00 | 0.00 | 38,000.00 | 100.00 | 0.00 | 478.33 | |
| G3-002 | Stone Underslab | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 62.94 | |
| G3-003 | Form/Pour 18" Thick Slab | 39,000.00 | 39,000.00 | 0.00 | 0.00 | 39,000.00 | 100.00 | 0.00 | 490.92 | |
| G3-004 | Form/Pour Exterior Walls | 65,000.00 | 65,000.00 | 0.00 | 0.00 | 65,000.00 | 100.00 | 0.00 | 818.20 | |
| G3-005 | Backfill | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 151.05 | |
| G3-006 | Excavate Footers; Elev 2'8" | 7,000.00 | 7,000.00 | 0.00 | 0.00 | 7,000.00 | 100.00 | 0.00 | 88.11 | |
| G3-007 | Form/Pour Footers | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 151.05 | |
| G3-008 | Install Masonry Frost Wall | 9,000.00 | 9,000.00 | 0.00 | 0.00 | 9,000.00 | 100.00 | 0.00 | 113.29 | |
| G3-009 | Pour Slab | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| G3-010 | Form/Pour Channel Walls | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 629.39 | |
| G3-011 | Install Exterior Masonry Walls | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 377.63 | |
Application and Certificate For Payment -- page 5
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G3-012 | Structural Steel | 3,000.00 | 3,000.00 | 0.00 | 0.00 | 3,000.00 | 100.00 | 0.00 | 37.76 | |
| G3-013 | Misc Metals | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| G3-014 | Rough Carpentry | 24,000.00 | 24,000.00 | 0.00 | 0.00 | 24,000.00 | 100.00 | 0.00 | 302.11 | |
| G3-015 | Dryvit | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 226.58 | |
| G3-016 | FRP Grating | 4,000.00 | 4,000.00 | 0.00 | 0.00 | 4,000.00 | 100.00 | 0.00 | 50.35 | |
| G3-017 | Hollow Metal & FRP Doors | 1,500.00 | 1,500.00 | 0.00 | 0.00 | 1,500.00 | 100.00 | 0.00 | 18.88 | |
| G3-018 | Overhead Doors | 17,500.00 | 17,500.00 | 0.00 | 0.00 | 17,500.00 | 100.00 | 0.00 | 220.29 | |
| G3-019 | Trolley & Hoist | 2,000.00 | 2,000.00 | 0.00 | 0.00 | 2,000.00 | 100.00 | 0.00 | 25.18 | |
| G3-020 | Plumbing | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 62.94 | |
| G3-021 | HVAC | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| G3-022 | Painting | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 151.05 | |
| Subtotal | 380,000.00 | 380,000.00 | 0.00 | 0.00 | 380,000.00 | 100.00 | 0.00 | 4,783.33 | ||
| G4-000 | Grinder w/RotatingScreen&Auger | |||||||||
| G4-001 | Screen | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 2,265.79 | |
| Subtotal | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 2,265.79 | ||
| G5-000 | PrecastPost TensionedSBR Tanks | |||||||||
| G5-001 | Bulk Excavate SBR Structure | 100,000.00 | 100,000.00 | 0.00 | 0.00 | 100,000.00 | 100.00 | 0.00 | 1,258.77 | |
| G5-002 | Stone Underslab-SBR Structure | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 377.63 | |
| G5-003 | Concrete Base Slab for SBR | 690,000.00 | 690,000.00 | 0.00 | 0.00 | 690,000.00 | 100.00 | 0.00 | 8,685.53 | |
| G5-004 | Backfill Tank | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G5-005 | Walls & Walkways | 750,000.00 | 750,000.00 | 0.00 | 0.00 | 750,000.00 | 100.00 | 0.00 | 9,440.80 | |
| G5-006 | Misc Metals | 60,000.00 | 60,000.00 | 0.00 | 0.00 | 60,000.00 | 100.00 | 0.00 | 755.26 | |
| Subtotal | 1,650,000.00 | 1,650,000.00 | 0.00 | 0.00 | 1,650,000.00 | 100.00 | 0.00 | 20,769.74 | ||
| G6-000 | Treatment Building | |||||||||
| G6-001 | Excavate Footers | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 503.51 | |
| G6-002 | Pour Footers | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 |
Application and Certificate For Payment -- page 6
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G6-003 | Pour Pier Footers | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| G6-004 | Pour Piers | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| G6-005 | Masonry Frost Walls | 15,000.00 | 15,000.00 | 0.00 | 0.00 | 15,000.00 | 100.00 | 0.00 | 188.82 | |
| G6-006 | Backfill | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| G6-007 | Stone Under Slab | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 75.53 | |
| G6-008 | Plumbing Under Slab | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| G6-009 | Concrete Slab | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 226.58 | |
| G6-010 | Precast Flocculation Tank | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 440.57 | |
| G6-011 | Precast Effluent Storage Tank | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G6-012 | Poured In Place UV Channel | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G6-013 | Masonry | 72,000.00 | 72,000.00 | 0.00 | 0.00 | 72,000.00 | 100.00 | 0.00 | 906.32 | |
| G6-014 | Structural Steel & Deck | 28,000.00 | 28,000.00 | 0.00 | 0.00 | 28,000.00 | 100.00 | 0.00 | 352.46 | |
| G6-015 | Misc Metals | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G6-016 | FRP Grating | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| G6-017 | Dryvit | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 440.57 | |
| G6-018 | EPDM Roofing | 40,000.00 | 40,000.00 | 0.00 | 0.00 | 40,000.00 | 100.00 | 0.00 | 503.51 | |
| G6-019 | Caulking | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 62.94 | |
| G6-020 | Hollow Metal & FRP Doors | 2,500.00 | 2,500.00 | 0.00 | 0.00 | 2,500.00 | 100.00 | 0.00 | 31.47 | |
| G6-021 | Overhead Doors | 19,500.00 | 19,500.00 | 0.00 | 0.00 | 19,500.00 | 100.00 | 0.00 | 245.46 | |
| G6-022 | Painting | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 440.57 | |
| G6-023 | Top Entry Mixer | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G6-024 | Plumbing | 23,000.00 | 23,000.00 | 0.00 | 0.00 | 23,000.00 | 100.00 | 0.00 | 289.52 | |
| G6-025 | HVAC | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 629.39 | |
| Subtotal | 575,000.00 | 575,000.00 | 0.00 | 0.00 | 575,000.00 | 100.00 | 0.00 | 7,237.96 | ||
| G7-000 | SBR/Chem Feed & Process Piping | |||||||||
| G7-001 | SBR Equipment | 790,000.00 | 790,000.00 | 0.00 | 0.00 | 790,000.00 | 100.00 | 0.00 | 9,944.31 |
Application and Certificate For Payment -- page 7
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| G7-002 | Polymer Feed System | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 226.58 | |
| G7-003 | Chem Feed Pumps & Piping | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 226.58 | |
| G7-004 | Inline Static Mixers | 25,500.00 | 25,500.00 | 0.00 | 0.00 | 25,500.00 | 100.00 | 0.00 | 320.99 | |
| G7-005 | Inline Grinder | 8,500.00 | 8,500.00 | 0.00 | 0.00 | 8,500.00 | 100.00 | 0.00 | 107.00 | |
| G7-006 | Utility Water Pumps & Controls | 80,000.00 | 80,000.00 | 0.00 | 0.00 | 80,000.00 | 100.00 | 0.00 | 1,007.02 | |
| G7-007 | Instrumentation & Controls | 127,000.00 | 127,000.00 | 0.00 | 0.00 | 127,000.00 | 100.00 | 0.00 | 1,598.64 | |
| G7-008 | FRP Chemical Tank | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| G7-009 | Process Piping | 245,000.00 | 245,000.00 | 0.00 | 0.00 | 245,000.00 | 100.00 | 0.00 | 3,083.99 | |
| G7-010 | Relocated Apple Brook Pump | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| Subtotal | 1,345,000.00 | 1,345,000.00 | 0.00 | 0.00 | 1,345,000.00 | 100.00 | 0.00 | 16,930.50 | ||
| G8-000 | Filtration & UV System | |||||||||
| G8-001 | Disk Filters | 470,000.00 | 470,000.00 | 0.00 | 0.00 | 470,000.00 | 100.00 | 0.00 | 5,916.23 | |
| G8-002 | Filter Feed Pumps | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| G8-003 | UV System | 180,000.00 | 180,000.00 | 0.00 | 0.00 | 180,000.00 | 100.00 | 0.00 | 2,265.79 | |
| Subtotal | 660,000.00 | 660,000.00 | 0.00 | 0.00 | 660,000.00 | 100.00 | 0.00 | 8,307.90 | ||
| G9-000 | Sludge Digestion & Post EQ Tank | |||||||||
| G9-001 | Demo Interior | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G9-002 | Sandblasting & Painting | 160,000.00 | 160,000.00 | 0.00 | 0.00 | 160,000.00 | 100.00 | 0.00 | 2,014.04 | |
| G9-003 | Course Bubble Diffuser | 30,000.00 | 30,000.00 | 0.00 | 0.00 | 30,000.00 | 100.00 | 0.00 | 377.63 | |
| G9-004 | Centrifugal Blower Recondition | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| G9-005 | Aeration Tank Rehabilitation | 45,000.00 | 45,000.00 | 0.00 | 0.00 | 45,000.00 | 100.00 | 0.00 | 566.45 | |
| Subtotal | 275,000.00 | 275,000.00 | 0.00 | 0.00 | 275,000.00 | 100.00 | 0.00 | 3,461.62 | ||
| GG10-000 | Sludge Dewatering BldgAddition | |||||||||
| GG10-001 | Demo Centrifuge | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| GG10-002 | Demo Building | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| GG10-003 | Sawcut Floor | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
Application and Certificate For Payment -- page 8
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:
| Item Number | Description | Scheduled Value | Work Completed: Previous Application | Work Completed: This Period | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo |
|---|---|---|---|---|---|---|---|---|---|---|
| GG10-004 | Excavate Footers | 12,000.00 | 12,000.00 | 0.00 | 0.00 | 12,000.00 | 100.00 | 0.00 | 151.05 | |
| GG10-005 | Form & Pour Footers | 8,000.00 | 8,000.00 | 0.00 | 0.00 | 8,000.00 | 100.00 | 0.00 | 100.70 | |
| GG10-006 | Masonry Frost Walls | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 251.75 | |
| GG10-007 | Backfill | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 75.53 | |
| GG10-008 | Underslab Plumbing | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 62.94 | |
| GG10-009 | Misc Metals | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| GG10-010 | Pour Concrete Slab | 10,000.00 | 10,000.00 | 0.00 | 0.00 | 10,000.00 | 100.00 | 0.00 | 125.88 | |
| GG10-011 | Masonry Walls | 35,000.00 | 35,000.00 | 0.00 | 0.00 | 35,000.00 | 100.00 | 0.00 | 440.57 | |
| GG10-012 | Dryvit | 25,000.00 | 25,000.00 | 0.00 | 0.00 | 25,000.00 | 100.00 | 0.00 | 314.69 | |
| GG10-013 | Frames & Doors | 1,500.00 | 1,500.00 | 0.00 | 0.00 | 1,500.00 | 100.00 | 0.00 | 18.88 | |
| GG10-014 | Overhead Doors | 6,000.00 | 6,000.00 | 0.00 | 0.00 | 6,000.00 | 100.00 | 0.00 | 50.35 | |
| GG10-015 | Trolley & Hoist | 4,000.00 | 4,000.00 | 0.00 | 0.00 | 4,000.00 | 100.00 | 0.00 | 490.92 | |
| GG10-016 | Carpentry | 39,000.00 | 39,000.00 | 0.00 | 0.00 | 39,000.00 | 100.00 | 0.00 | 251.75 | |
| GG10-017 | Painting | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 20,000.00 | 100.00 | 0.00 | 62.94 | |
| GG10-018 | Plumbing | 5,000.00 | 5,000.00 | 0.00 | 0.00 | 5,000.00 | 100.00 | 0.00 | 94.41 | |
| GG10-019 | HVAC | 7,500.00 | 7,500.00 | 0.00 | 0.00 | 7,500.00 | 100.00 | 0.00 | 6,608.56 | |
| GG11-000 | Sludge DewateringSystem & Pipe | |||||||||
| GG11-001 | Centrifuge | 525,000.00 | 525,000.00 | 0.00 | 0.00 | 525,000.00 | 100.00 | 0.00 | 88.11 | |
| GG11-002 | Progressive Conveying System | 7,000.00 | 7,000.00 | 0.00 | 0.00 | 7,000.00 | 100.00 | 0.00 | 226.58 | |
| GG11-003 | Sludge Conveying System | 18,000.00 | 18,000.00 | 0.00 | 0.00 | 18,000.00 | 100.00 | 0.00 | 2,517.55 | |
| GG11-004 | Process Pipe | 200,000.00 | 200,000.00 | 0.00 | 0.00 | 200,000.00 | 100.00 | 0.00 | 629.39 | |
| GG12-000 | Site Paving | |||||||||
| GG12-001 | Lump Sum | 50,000.00 | 50,000.00 | 0.00 | 0.00 | 50,000.00 | 100.00 | 0.00 | 55.39 | |
| GG13-000 | Engineered Fill | |||||||||
| GG13-001 | Lump Sum | 4,400.00 | 4,400.00 | 0.00 | 0.00 | 4,400.00 | 100.00 | 0.00 | ||
| GG14-000 | Flowable Fill | |||||||||
Application and Certificate For Payment -- page 9
To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Contractor's Job Number: P28001
Architect's Project No:
Date: 11/30/10
Period To: 11/30/10
| Item Number | Description | Scheduled Value | Work Completed | Materials Presently Stored | Completed and Stored to Date | % | Balance to Finish | Retention | Memo | |
|---|---|---|---|---|---|---|---|---|---|---|
| Previous Application | This Period | |||||||||
| GG14-001 | Lump Sum | 11,000.00 | 11,000.00 | 0.00 | 0.00 | 11,000.00 | 100.00 | 0.00 | 138.47 | |
| GG18-000 | Alternate G-18 | |||||||||
| GG18-001 | Lump Sum | 125,000.00 | 125,000.00 | 0.00 | 0.00 | 125,000.00 | 100.00 | 0.00 | 1,573.46 | |
| Subtotal | 1,180,400.00 | 1,180,400.00 | 0.00 | 0.00 | 1,180,400.00 | 100.00 | 0.00 | 14,858.56 | ||
| Application Total | 7,869,424.34 | 7,869,424.34 | 0.00 | 0.00 | 7,869,424.34 | 100.00 | 0.00 | 99,058.22 | ||
Brickhouse Environmental
Consultants and Engineers
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Invoice number: 5683
Date: 12/1/2010
Client ID: 548
Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager
SEE PROJECT ACCOMPLISHMENTS ATTACHED.
Professional Services Rendered Through the Month of November 2010.
Labor
| Employee Type | Hours | Amount |
|---|---|---|
| Project Manager | 86.50 | 9,947.50 |
| Labor Total | 86.50 | 9,947.50 |
| Reimbursable | Amount |
|---|---|
| Expense Total | 0.00 |
| Invoice Total | 9,947.50 |
OK RS
12/10/10
Payment Terms: Net Thirty (30) Days; Credit Cards Accepted
515 South Franklin St
West Chester, PA 19[382]
Phone 610.692.5[...]
Fax 610.692.8[...]
www.brickhouse-environmental[...]
Where Creativity & Experience Count
Brickhouse Environmental
East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement
Brickhouse's contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours and $175,030.
From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.
The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting which then expended the original 1,522 h
The Board subsequently approved Brickhouse Environmental to continue to serve the Authority's needs as requested on a T&M basis.
Monthly Project Management Subtotals Beyond the Original Budget
| Month | Project Subtotals | |||
|---|---|---|---|---|
| Pro. Mgt. Hours | Cumulative Hours | Cumulative Fees | Monthly Fees | |
| October 2010 | 36.25 | 36.25 | $4,168.75 | $4,168.75 |
| November 2010 | 86.50 | 122.75 | $14,116.25 | $9,947.50 |
Project Cumulating Totals
| Project Management Hours | Fee |
|---|---|
| 1,644.75 | $189,146.25 |
Page 1 of 1
J:\092532.0\Project Management\PM Schedule\Extended Schedule.xls
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 457258
Invoice Date: 11/23/2010
Project: EGMA0707
Project Name: RCSTP Expansion
For Services Rendered through: 11/07/2010
Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist development and progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss punchlists with contractors.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| 01 -- Permit Design | est. | $111,400.00 | $111,385.00 | $111,385.00 | $0.00 | |
| 02 -- Permitting | est. | $14,200.00 | $14,184.00 | $14,184.00 | $0.00 | |
| 03 -- Final Design | est. | $226,700.00 | $226,655.50 | $226,655.50 | $0.00 | |
| 04 -- Bidding | est. | $14,500.00 | $14,446.50 | $14,446.50 | $0.00 | |
| 05 -- Construction | est. | $136,200.00 | $136,197.62 | $136,197.62 | $0.00 | |
| 06 -- Additional Submittals | est. | $20,000.00 | $19,997.18 | $19,997.18 | $0.00 | |
| 10 -- Continued Construction Services | est. | $192,320.00 | $183,550.57 | $187,648.32 | $4,097.75 | |
| Total : | $715,320.00 | $706,416.37 | $710,514.12 | $4,097.75 |
Amount Due This Invoice: $4,097.75
OK RS
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls
Invoice Date 11-23-2010
Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 457258
Invoice Period: 10/18/2010 to 11/7/2010
| Initial Authorization: | $ 465,000.00 | Date: | 8/14/2007 |
|---|---|---|---|
| Changes: | $ - | Date: | 2/5/2009 |
| Changes: | $ 58,000.00 | Date: | 5/11/2009 |
| Changes: | $ 99,700.00 | Date: | 1/11/2010 |
| Changes: | $ 22,000.00 | Date: | 5/10/2010 |
| Changes: | $ 11,500.00 | Date: | 6/14/2010 |
| Changes: | $ 40,400.00 | Date: | 8/5/2010 |
| Changes: | $ 18,720.00 | Date: | 10/11/2010 |
| Contract Amount: | $ 715,320.00 | ||
| Previously Invoiced: | $ 706,416.37 | ||
| Current Invoice: | $ 4,097.75 | ||
| Invoiced to Date ($): | $ 710,514.12 | ||
| Invoiced to Date (%): | 99% | ||
| Remaining Budget ($): | $ 4,805.88 | ||
| Remaining Budget (%): | 0.67% |
Budget by Phase:
Phase No. 10
Phase Name: Continued Eng Svcs
| Phase Budget: | $ 99,700.00 |
|---|---|
| Changes: | $ 33,500.00 |
| Changes: | $ 40,400.00 |
| Changes: | $ 18,720.00 |
| Contract Amount: | $ 192,320.00 |
| Previously Invoiced: | $ 183,550.57 |
| Current Invoice: | $ 4,097.75 |
| Invoiced to Date ($): | $ 187,648.32 |
| Invoiced to Date (%): | 98% |
| Remaining Budget ($): | $ 4,671.68 |
| Remaining Budget (%): | 5% |
Comments: Phase 10 - Continued Engineering Services
Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist development and progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss punchlists with contractors.
Effort by Labor Category under Phase 10:
| Category | Previous Hrs. | Current | Total Hrs. |
|---|---|---|---|
| Authority Engineer | 207.25 | 4.00 | 211.25 |
| Senior Engineer | 395.25 | 2.50 | 397.75 |
| Senior Designer | 197.00 | 3.00 | 200.00 |
| Project Engineer | 164.50 | 0.00 | 164.50 |
| Staff Engineer | 12.25 | 1.25 | 13.50 |
| Associate Engineer | 69.00 | 4.00 | 73.00 |
| Graduate Engineer | 43.75 | 0.00 | 43.75 |
| Project Representative/Inspector | 2.50 | 0.00 | 2.50 |
| Technical Specialist (McAloon) | 1018.75 | 33.50 | 1052.25 |
| Engineering Technician I | 49.00 | 3.50 | 52.50 |
| Administrative Assistant I | 1.50 | 0.00 | 1.50 |
| Totals | 2160.75 | 51.75 | 2212.50 |
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
COPY
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
11/30/2010
Client No: 6604-06M
Invoice No. 84386
Ridley Creek Treatment Plant Upgrades/ Expansion
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 11/08/2010 RFA |
Review memo from Rick Smith regarding proposed settlement with Worth & Company; attend executive session of Authority Board to discuss Worth & Company settlement. | 0.90 | |
| For Current Services Rendered | 0.90 | 171.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 0.90 | $190.00 | $171.00 |
Total Current Charges: 171.00
Balance Due: $171.00
ok RS
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
COPY
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
11/30/2010
Client No: 6604-08M
Invoice No. 84387
Ridley Creek Treatment Plant - Arbitratrations
| Date | Description | Amount |
|---|---|---|
| Previous Balance | $1,962.50 | |
| 11/15/2010 | Cost Expense Payment | -20.00 |
| 11/15/2010 | Fee Payment | -1,222.50 |
| Total Payments | -1,242.50 | |
| Balance Due | $720.00 |
ok rs
To ensure proper credit, please write client number on
your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be
charged on balances not paid 60 days after the invoice date.
800-999-1018 • Fax 610-560-7921
RC Plant Exp.
Independence CONSTRUCTION MATERIALS
•Including D.M. Stoltzfus Division•
Remit To:
INDEPENDENCE CONSTRUCTION MATERIALS
PO BOX 347337
PITTSBURGH, PA 15251-4337
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424.7454
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
Invoice Number: 30-00010257
Invoice Date: 05-NOV-10
Customer #: 30575
Project #: 3057510CONT
P.O. #:
Project Name: MATERIAL SUPPLY CONTRACT
Location: Devault Asphalt
| Date | Ticket | Product Desc. | Truck # | Order | Quantity | Unit Price | Haul Rate | Fuel Surcharge | AC Adj | Item Subtotal |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/02/10 | 20131790 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.16 | $34.25 | $0.00 | $0.00 | $0.46 | $352.65 |
| 11/02/10 | 20131817 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.06 | $34.25 | $0.00 | $0.00 | $0.46 | $349.18 |
| 11/02/10 | 20131833 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.01 | $34.25 | $0.00 | $0.00 | $0.46 | $347.45 |
| 11/02/10 | 20131838 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.02 | $34.25 | $0.00 | $0.00 | $0.46 | $347.79 |
| 11/02/10 | 20131866 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.00 | $34.25 | $0.00 | $0.00 | $0.46 | $347.10 |
| 11/02/10 | 20131867 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.00 | $34.25 | $0.00 | $0.00 | $0.46 | $347.10 |
| 11/02/10 | 20131871 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 9.98 | $34.25 | $0.00 | $0.00 | $0.46 | $346.41 |
| 11/02/10 | 20131884 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.01 | $34.25 | $0.00 | $0.00 | $0.46 | $347.45 |
| 11/02/10 | 20131888 cpu |
10-C22 25MM 3-30 V253BR25B | EGT007 | 201010 | 10.12 | $34.25 | $0.00 | $0.00 | $0.46 | $351.27 |
Terms: Net 30 Days
Total Quantity: 90.36
SUBTOTAL: $3,136.40
TAX: $0.00
TOTAL: $3,136.40
OK RS
11/19
1.5% MONTH FINANCE CHARGE ON PAST DUE BALANCE
800-999-1018 • Fax 610-560-7921
Independence CONSTRUCTION MATERIALS
•Including D.M. Stoltzfus Division•
Remit To:
INDEPENDENCE CONSTRUCTION MATERIALS
PO BOX 347337
PITTSBURGH, PA 15251-4337
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
Invoice Number: 30-00010259
Invoice Date: 05-NOV-10
Customer #: 30575
Project #: 3057510CONT
P.O. #:
Project Name: MATERIAL SUPPLY CONTRACT
Location: Devault Asphalt
| Date | Ticket | Product Desc. | Truck # | Order | Quantity | Unit Price | Haul Rate | Fuel Surcharge | AC Adj | Item Subtotal |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/03/10 | 20132054 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 9.96 | $34.25 | $0.00 | $0.00 | $0.54 | $346.51 |
Terms: Net 30 Days
Total Quantity: 120.81
SUBTOTAL: $4,202.99
TAX: $0.00
TOTAL: $4,202.99
1.5% MONTH FINANCE CHARGE ON PAST DUE BALANCE
800-999-1018 • Fax 610-560-7921
RC Plant Expansion
Independence CONSTRUCTION MATERIALS
•Including D.M. Stoltzfus Division•
Remit To:
INDEPENDENCE CONSTRUCTION MATERIALS
PO BOX 347337
PITTSBURGH, PA 15251-4337
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424.7454
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
Invoice Number: 30-00010259
Invoice Date: 05-NOV-10
Customer #: 30575
Project #: 3057510CONT
P.O. #:
Project Name: MATERIAL SUPPLY CONTRACT
Location: Devault Asphalt
| Date | Ticket | Product Desc. | Truck # | Order | Quantity | Unit Price | Haul Rate | Fuel Surcharge | AC Adj | Item Subtotal |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/03/10 | 20131968 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 9.99 | $34.25 | $0.00 | $0.00 | $0.54 | $347.55 |
| 11/03/10 | 20131969 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 9.95 | $34.25 | $0.00 | $0.00 | $0.54 | $346.16 |
| 11/03/10 | 20131972 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 9.96 | $34.25 | $0.00 | $0.00 | $0.54 | $346.51 |
| 11/03/10 | 20131996 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.05 | $34.25 | $0.00 | $0.00 | $0.54 | $349.64 |
| 11/03/10 | 20132008 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.07 | $34.25 | $0.00 | $0.00 | $0.54 | $350.34 |
| 11/03/10 | 20132012 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.21 | $34.25 | $0.00 | $0.00 | $0.54 | $355.21 |
| 11/03/10 | 20132015 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.13 | $34.25 | $0.00 | $0.00 | $0.54 | $352.42 |
| 11/03/10 | 20132025 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.08 | $34.25 | $0.00 | $0.00 | $0.54 | $350.68 |
| 11/03/10 | 20132035 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.19 | $34.25 | $0.00 | $0.00 | $0.54 | $354.51 |
| 11/03/10 | 20132049 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 9.97 | $34.25 | $0.00 | $0.00 | $0.54 | $346.86 |
| 11/03/10 | 20132052 cpu |
10-C23 25MM 3-30 V253CS5B | EGT007 | 201014 | 10.25 | $34.25 | $0.00 | $0.00 | $0.54 | $356.60 |
1.5% MONTH FINANCE CHARGE ON PAST DUE BALANCE
ok RS
11/19
PowerPro EQUIPMENT - INVOICE
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
(717) 354-4241
FAX (717) 355-2466
820 EAST WASHINGTON STREET
WEST CHESTER, PA 19380
(610) 738-9000
FAX (610) 738-9003
6515 B MEMORIAL ROAD
ALLENTOWN, PA 18106
(610) 395-6499
FAX (610) 395-6692
** COD - CASH/C
| DOCUMENT | INVOICE | CUSTOMER | DATE | PG |
|---|---|---|---|---|
| P32515 | 080067C | 10/27/10 | 1 |
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
R.C.
| BR | TRK | MAKE | MODEL | SERIAL NUMBER | EQUIPMENT | HOURS/METER | SLSM | CUSTOMER P.O | DATE SHIPPED |
|---|---|---|---|---|---|---|---|---|---|
| 02 | 57 | RIDLEY CREEK | 10/27/10 |
| ORDER | SHIP | B/O | MFR | PART NUMBER | DESCRIPTION | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| Telephone 610/692-7171 Taken By KS |
|||||||
| 5 | 5 | CS | 75132020 | 1/2" REBAR 10FT | 3.50 | 17.50 | |
| TOTAL PARTS | 17.50 | ||||||
| NON TAX - GOVT NT-GOVT |
.00 |
APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07424.7454
ok rs
-=< THANK YOU FOR YOUR BUSINESS >=-
WWW.POWERPROEQUIPMENT.COM
| CREDIT AMOUNT | TOTAL AMOUNT |
|---|---|
| 17.50 |
TERMS: A 1 1/2% PER MONTH LATE CHARGE IS ADDED TO THE UNPAID BALANCE ON ACCOUNTS PAST DUE PER TERMS REFERENCED ABOVE. THIS IS AN 18% ANNUAL PERCENTAGE RATE.
PAST DUE ACCOUNTS WILL BE REFERRED FOR COLLECTION AND CUSTOMER IS LIABLE FOR LEGAL COSTS.
ALL CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS INVOICE. THERE IS A 15% RESTOCKING CHARGE AFTER SEVEN (7) DAYS.
STORAGE CHARGE 30 DAYS AFTER NOTIFICATION.
REMIT TO:
POWER PRO NEW HOLLAND
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
We accept all major credit cards
WHITE - CUSTOMER COPY • PINK - REMITTANCE COPY • CANARY - FILE COPY
Authorized Signature: ________________ Date: ________ Pulled By: ________ Checked By: ________
POWER PRO EQUIPMENT - W CHESTR
820 E WASHINGTON STREET
WEST CHESTER PA 19380
PHONE: 610/738-9000
FAX: 610/738-9003
PARTS ORDER
Customer: 080067C
Document: P32515
Pg: 1
** COD - CASH/CHECK **
10/26/10 9:13
Sold To:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
Ship To:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171
| Br | Trk | Make | Model | Serial | Equipment | Meter | Sls | Customer P.O. |
|---|---|---|---|---|---|---|---|---|
| 002 | 57 | RIDLEY CREEK |
| Ordr | Ship | B/O | Description | Each | Amount |
|---|---|---|---|---|---|
| Taken By | KS | Ordered 10/26/10 | |||
| 5 | 5 | CS 75132020 1/2" REB CS7513* | 3.50 | 17.50 | |
| NON TAX - GOVT | .00 | ||||
| NT-GOVT |
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07
Steps at Ridley
{{{--- THANK YOU FOR YOUR BUSINESS
PLEASE LET US SERVE YOU AGAIN ---}}}
George Thompson
Total: 17.50
Ransome Rental Co., LP
THE CAT RENTAL STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
INVOICE
Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735
R.C.
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SHIP TO:
CPU IN WEST CHESTER
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| K0308701 | 10-25-10 | 1268550 | 30 | R | 095 | 2 | 1 | |
| Agreement Number | Agreement Date | PC | LC | MC | Ship Via | Inv Seq No | ||
| K03087 | 10-11-10 | 10 | CPU IN PA | LR | 361774 | |||
| Make | Model | Serial Number | Equipment Number | Meter Reading | Mach Id No | |||
| AA | D3GXL | JMH02478 | 361.0 | HR3002 |
CUSTOMER CONTACT: MARK
TAX EXEMPTION LICENSE GOVT/PA
| 1.0 | EQUIPMENT RENTAL CATERPILLAR TRK TYPE TRACTOR ID NO: HR3002 |
FROM 10/11/10 THRU 10/25/10 MODEL D3GXL SERIAL NO: JMH02478 PIN: *CAT00D3GCJMH02478* |
1976.00 |
|---|---|---|---|
| 1.0 | CLEANING CHARGE | ||
| 1.0 | ENVIRO CHARGE | 8.00 | |
| 1.0 | CUST |
RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424.7454
ok RS
Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment.
| PLEASE PAY THIS AMOUNT | 1984.00 |
|---|---|
| AMOUNT CREDITED |
CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300
Ransome Rental Co., LP
RENTAL AGREEMENT
THE CAT RENTAL STORE
1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270
Lessee Bill To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Ship To
CPU IN WEST CHESTER
| Invoice Number | Invoice Date | Customer Number | Customer Order No | Store | Div | Salesman | Terms | Page |
|---|---|---|---|---|---|---|---|---|
| 10/11/10 | 1268550 | 30 | R | 095 | 2 | 1 | ||
| Agreement Number | Agreement Date | PC | LC | MC | Ship Via | Inv Seq No | ||
| K03087 | 10/11/10 | 10 | CPU IN PA | |||||
| Make | Model | Serial Number | Equipment Number | Meter Reading | Mach Id No | |||
| AA | D3GXL | 0JMH02478 | 360.0 | HR3002 |
CUSTOMER CONTACT: MARK
PHONE: 610 692 7171
| ITEM | QTY | RENTAL RATE | PERIOD | MKT VAL |
|---|---|---|---|---|
| IDNO: HR3002 MODEL: D3GXL SERIAL NUMBER: 0JMH02478 PIN: *CAT00D3GCJMH02478* DESC: TRK TYPE TRACTOR TIME OUT: 11:00 DATE OUT: 10/11/10 METER OUT: 360.0 |
1.0 | 4 WEEK WEEK DAY |
70,000.00 | |
| EXPECTED RETURN DATE: 10/18/10 SHIP VIA: CPU IN PA |
MISCELLANEOUS CHARGES
| CLEANING CHARGE | 1 | 40.00 |
|---|---|---|
| ENVIRO CHARGE | 1 | 8.00 |
| CUST | 1 | .00 |
RE-FUEL CHARGE PER GALLON: $6.00
NON-RETURNED KEY CHARGE: $10.00
****PLEASE READ ALL OPERATOR SAFETY MANUALS****
PLEASE CALL TO RELEASE EQUIPMENT WHEN FINISHED
TOLL FREE 1-888-438-RENT (7368)
DAY=8 HOURS, WEEK=40 HOURS, 4 WEEK=160 HOURS
CLEANING CHARGE: NONE _____ STANDARD _____ HEAVY _____
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424 -
Prep sub grade
| Delivery Date | Time | Pick Up Date | Time |
|---|---|---|---|
| Delivery Condition | Return Condition | ||
| Hour Meter | Fuel Out | Hour Meter | Fuel In |
| Sheet Metal | Sheet Metal | ||
| Tires | Tires | ||
| Attach/Misc. | Attach/Misc. | ||
| Accepted & Received By Renter | Date | Customer Return Signature | Date |
| Please Print Name | SEE TERMS ON BACK | ||
RENTERS/LESSEE RESPONSIBILITIES: Renter/Lessee must check & maintain all fluid levels and lubricating points (engine oil, water, hydraulic oil, fuel, battery, greasing pins, etc.) DAILY. TIRE DAMAGE: Excessive wear, tire repair, and any damage to rented machine are renter's responsibility. Machine to be returned in reasonable clean condition. Minimum cleaning charge of $100 will be assessed if returned dirty. Renter will be charged for refueling. Daily inspect unit for damage, leaks, etc. and report problems immediately to Ransome Rents. The equipment described above has been received in good repair and operating condition.
FIRE/THEFT/VANDALISM
FTV (FIRE/THEFT/VANDALISM WAIVER) will be charged at 14% of the rental amount. This damage waiver covers theft, fire and vandalism only. You remain responsible for physical damage or injury. Fire/Theft/Vandalism waiver (FTV) is not insurance.
** Not available on Heavy Equipment Rentals. **
Ransome Rental Co., LP offers training on all rental equipment. TRAINING DECLINED (Please Initial) ________
CUSTOMER DELIVERY
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354.1300 • Fax (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS
-- INVOICE --
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.
TERMS: NET 30 DAYS
INVOICE NUMBER: 302737
| INVOICE DATE | CUST. ACCT. NO. | CUST. JOB NO. | CUST. P.O. NO. | ZONE |
|---|---|---|---|---|
| 10/18/10 | 016716 002 | 7 |
JOB NAME: 2010 PRICING/TWP BUILDING
PLANT: 01 WEAVERLAND
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/15/10 | A053352 | 23.88 | TN | 12.410 | 2A 21.66 | 296.35 RC |
| 10/15/10 | A053359 | 23.76 | TN | 12.410 | 2A 21.55 | 294.86 |
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 1454 7350 294.86
1 Load To R/C plant
(to paid by MA construction)
1 Load to Line Rd
For PATH WAY
ok RS
| [X] TAX EXEMPT | TOTAL TONS: 47.64 | TOTAL SALE: 591.21 | TRUCK CHARGES: .00 | SALES TAX: .00 |
|---|---|---|---|---|
| TOTAL | 591.21 | |||
EAST GOSHEN TOWNSHIP
| ACCOUNT | DATE | INVOICE NO. | AMOUNT |
|---|---|---|---|
| 016716 002 | 10/18/10 | 302737 | 591.21 |
PAY BY: M160
MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT
Martin LIMESTONE
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202
PLANT: 01 WEAVERLAND
Phone: 717-354-1370
| ORDER NO. | TICKET NUMBER | SCALE | AUTO/MANUAL | DATE | TIME |
|---|---|---|---|---|---|
| 1001070010 | 0101A053352 | 1 | A | 10/15/2010 | 07:01 AM |
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER, PA 19830
CUSTOMER: 016716
PHONE: 610-692-7171
PO:
SHIP TO:
QUOTE: 1001040002
STATE:
ZONE: 7
| PRODUCT ID | PRODUCT DESCRIPTION | |
|---|---|---|
| 11 - 421 | 2A | [ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
JOB NAME / LOCATION: 2010 PRICING/TWP BUILDING WEST CHESTER
JOB:
ITEM:
| TAG NO. | AXLES | TRUCK | CARRIER NAME | CARRIER CODE |
|---|---|---|---|---|
| PA | 4 | RA20 | ARTERS TRUCKING | 525 |
| PICK-UP | FREIGHT PPD | FREIGHT COLLECT | ACCUMULATIVE QUANTITIES | PAYMENT METHOD: BILLABLE | |
|---|---|---|---|---|---|
| XX | ORDERED | 500.00 | MATERIAL: | ||
| U.S. WEIGHT 72,520 |
METRIC WEIGHT | GROSS | TODAY: 23.88 | LOADS: 1 | HAUL: |
| 24,760 | TARE | TO DATE: 96.40 | LOADS: 4 | ADD'L CHARGES: | |
| 47,760 | NET | ACCUMULATED CASH SALE | TAX: | ||
| 23.88 | TN | TOTAL THIS LOAD: | |||
WEIGHED BY: CYNTHIA M KOCHEL 016049
INSPECTOR'S SIGNATURE: ________________
JOB ARRIVAL TIME: ________ JOB DEPARTURE TIME: ________
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 100 south, 202 south to paoli pike exit, left on paoli pike, cross boot rd to twp bldg on right. **ASK FOR MARK-- 610-656-2742.****
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454
Sub grade at Plant
YOUR BUSINESS IS GREATLY APPRECIATED.
01-0101A053352 *
CUSTOMER'S COPY
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • Blue Ball, PA 17506
TEL (717) 354.1300 • Fax (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS
-- INVOICE --
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.
TERMS: NET 30 DAYS
INVOICE NUMBER: 302735
| INVOICE DATE | CUST. ACCT. NO. | CUST. JOB NO. | CUST. P.O. NO. | ZONE |
|---|---|---|---|---|
| 10/18/10 | 016716 | 7 |
JOB NAME: 1751 TOWN DRIVE
PLANT: 01 WEAVERLAND
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/15/10 | A053371 | 24.16 | TN | 12.410 | 2A 21.92 | 299.83 RC |
| 10/15/10 | A053386 | 24.19 | TN | 12.410 | 2A 21.94 | 300.20 |
APPROVED BY: Mse
DATE PAID: ________
CHECK #: ________
CHARGED TO: 01454-7350
Trail Line Rd.
ok RS
| [X] TAX EXEMPT | TOTAL TONS: 48.35 | TOTAL SALE: 600.03 | TRUCK CHARGES: .00 | SALES TAX: .00 |
|---|---|---|---|---|
| TOTAL | 300.20 600.03 | |||
EAST GOSHEN TOWNSHIP
| ACCOUNT | DATE | INVOICENO. | AMOUNT |
|---|---|---|---|
| 016716 | 10/18/10 | 302735 | 300.20 600.03 |
PAY BY: M160
MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT
Martin LIMESTONE
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202
PLANT: 01 WEAVERLAND
Phone: 717-354-1370
| ORDER NO. | TICKET NUMBER | SCALE | AUTO/MANUAL | DATE | TIME |
|---|---|---|---|---|---|
| 1007160020 | 0101A053371 | 1 | A | 10/15/2010 | 09:43 AM |
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER, PA 19830
CUSTOMER: 016716
PHONE: 610-692-7171
PO:
SHIP TO:
QUOTE: 1001040002
STATE:
ZONE: 7
| PRODUCT ID | PRODUCT DESCRIPTION | |
|---|---|---|
| 11 - 421 | 2A | [ ] EXTRA CHARGE, PLOWED/NOT WORKED [ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE |
JOB NAME / LOCATION: 1751 TOWN DRIVE WEST CHESTER
JOB:
ITEM:
JOB REQUIRED NUMBERS
| TAG NO. | AXLES | TRUCK | CARRIER NAME | CARRIER CODE |
|---|---|---|---|---|
| NA | 4 | MM689 | PAUL M. MARTIN TRUCKING, LLC | 689 |
| PICK-UP | FREIGHT PPD | FREIGHT COLLECT | ACCUMULATIVE QUANTITIES | PAYMENT METHOD: BILLABLE | |
|---|---|---|---|---|---|
| XX | ORDERED | 200.00 | MATERIAL: | ||
| U.S. WEIGHT 72,980 |
METRIC WEIGHT | GROSS | TODAY: 24.16 | LOADS: 1 | HAUL: |
| 24,660 | TARE | TO DATE: 121.36 | LOADS: 5 | ADD'L CHARGES: | |
| 48,320 | NET | ACCUMULATED CASH SALE | TAX: | ||
| 24.16 | TN | TOTAL THIS LOAD: | |||
WEIGHED BY: CYNTHIA M KOCHEL 016049
INSPECTOR'S SIGNATURE: ________________
JOB ARRIVAL TIME: ________ JOB DEPARTURE TIME: ________
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.
322 east, 30 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left. *** Back In Drive *** mark 610-656-2742.
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-
R/C Plant
YOUR BUSINESS IS GREATLY APPRECIATED.
01-0101A053371 *
CUSTOMER'S COPY
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street Suite 100
P.O. Box 562
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
10/31/2010
Client No: 6604-08M
Invoice No. 84078
Ridley Creek Treatment Plant Upgrade/Expansion;
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 10/07/2010 RFA |
Conference with Steve McDonnell to review Clinger claim and Authority audited response. | 0.50 | 87.50 |
| SRM | Preparation of summary. | 1.00 | 175.00 |
| 10/11/2010 SRM |
Review of materials from Brickhouse. | 0.60 | 105.00 |
| SRM | Preparation for meeting with East Goshen. | 0.40 | 70.00 |
| SRM | Attend meeting with client. | 1.50 | 262.50 |
| For Current Services Rendered | 4.00 | 700.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 0.50 | $175.00 | $87.50 |
| Stephen R. McDonnell | 3.50 | 175.00 | 612.50 |
Expenses
| Photocopies | 20.00 |
|---|---|
| Total Expenses Thru 10/31/2010 | 20.00 |
| Previous Balance | Pd $1,242.50 |
| Total Current Charges | 720.00 |
| Balance Due | $1,962.50 |
ok RS
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
SILVI CONCRETE OF DOWNINGTOWN, LLC.
355 Newbold Road
Fairless Hills, PA 19030
215 295-0777
FAX: 215-295-0630
INVOICE
APPROVED BY: [signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424 7454
Invoice Date: 10/21/2010
Customer No. EAST0506
Invoice Number: 2122141
Page 1
Job Id: RIDLEY CR SEWER
Credit Terms: MTH END FWLING
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
| Date | Ticket | Qty | Description | Price | Taxbl Amt | Exmpt Amt |
|---|---|---|---|---|---|---|
| 10/21/10 | 874522 | 5.00 | 3500 AE | 59.50 | 297.50 | |
| 10/21/10 | 874522 | 1.00 | FLAT RATE CHARGE - PA | 220.00 | 220.00 | |
| 10/21/10 | 874522 | 5.00 | FIBER AD 1LB PER YD | 8.90 | 44.50 | |
| 10/21/10 | 874522 | 1.00 | WAITING TIME | 25.00 | 25.00 |
ok RS
11/9
Total CUBIC YARDS 5.00
A FINANCE CHARGE OF 1.5% WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE CHARGED ON ALL INVOICES NOT PAID BY THE END OF THE NEXT SUCCEEDING CALENDAR MONTH FROM THE DATE OF THE INVOICE
| Sub-Total | 587.00 |
|---|---|
| Non-Tax Total | 0.00 |
| Sales Tax- PA | 35.22 |
| Invoice Total | 622.22 |
SILVI CONCRETE OF CHESTER COUNTY, LLC
DOWNINGTOWN PLANT
MAIN OFFICE • MAILING ADDRESS
355 NEWBOLD ROAD, FAIRLESS HILLS, PA 19030
(215) 295-0777 www.silvi.com
FOR CONCRETE DELIVERIES: 1-800-426-6273
74096
ANY AND ALL WARRANTIES SHALL BE VOIDED WHEN EXTERIOR CONCRETE IS NOT PLACED IN ACCORDANCE WITH ACI318 WHICH REQUIRES A MINIMUM OF 4000 PSI AIR ENTRAINED CONCRETE THAT IS PROPERLY CURED AND SEALED.
CONTACT BETWEEN DEICING SALTS AND CONCRETE CAUSES SURFACE DETERIORATION.
PURCHASER MUST PROVIDE AN AREA FOR TRUCKS TO WASH DOWN CHUTE AFTER DISCHARGE.
| CYLINDERS TAKEN | YES □ NO □ |
|---|---|
| SLUMP TEST | YES □ NO □ |
| AIR TEST | YES □ NO □ |
| 10-1 Load | 10-2 Leave Plant | 10-3 Arrive Job Site | 10-5 Start Discharge | 10-6 Finish Disch. | 10-9 Leave Job Site | 10-10 Arrive Plant |
|---|---|---|---|---|---|---|
| 8:01 | 8:08 | 8:40 | 8:47 | 9:31 | 9:45 | 10:13 |
ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS STRENGTH.
ANY WATER ADDED IS AT CUSTOMERS RISK.
WATER ADDED ON JOB AT CUSTOMERS REQUEST _______ GAL.
MATERIALS, WATER ADDED, TRUCK TIMES, TESTS, WARNINGS AND CONDITIONS (SEE BACK) ARE CONFIRMED AND ACCEPTED BY X ________ INITIAL _____
PURCHASER IS RESPONSIBLE FOR ALL DAMAGE BY OR TO SELLER'S TRUCK AFTER LEAVING STREET AND FOR ALL RESULTING LIABILITY, DAMAGE, LOSS OR EXPENSE TO SELLER OR PROPERTY OWNER, INCLUDING TOW TRUCK AND LANDSCAPING CHARGES.
ANY CONCRETE THAT HARDENS IN THE TRUCKS BARREL OR MUST BE DISCHARGED ON THE GROUND TO AVOID HARDENING IN THE BARREL IS THE PURCHASER'S RESPONSIBILITY. ANY CONCRETE THAT HARDENS IN THE FORMS PRIOR TO BEING FINISHED IS ALSO THE PURCHASER'S RESPONSIBILITY.
| Plant 1 |
Ticket No. 874522 |
Truck 429 |
Load Size 5.00 |
Mix 3535, 3500 AE |
Slump 5.00 |
Use | Date 10/21/2010 |
|---|---|---|---|---|---|---|---|
| Customer No. AST0506 |
Sold To EAST GOSHEN TOWNSHIP |
Tx Cd 0 |
Driver METZ, CLIFF |
||||
| Delivery Address "slump #FAU RIDLEY CREEK SEWAGE |
P.O. No. | Order No. 319556 |
|||||
| Instructions 1751 TOURNE DRIVE: 202 EXIT(BOOT ROAD) MAKE A LEFT L PAOLI PIKE GO PAST TOWNSHIP BLDG R 352 L EAST BOOT ROAD R LINE |
|||||||
| LOAD QUANTITY | CUMULATIVE QUANTITY | ORDERED QUANTITY | PRODUCT CODE | PRODUCT DESCRIPTION | UNIT OF MEASURE | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| 5.00 | 5.00 | 5.00 | 3535 | 3500 AE | CY | 0.00 | 0.00 |
| 1 | 1 | 1 | FRCP | FLAT RATE CHARGE | CY | 0.00 | 0.00 |
| 5 | 5 | 5 | 1A1 | FIBER AD 1LB PER | CY | 0.00 | 0.00 |
MINUTES PER YD. ALLOWED FOR UNLOADING, ADDITIONAL TIME WILL BE BILLED.
FINANCE CHARGE OF 18% APR WILL BE ASSESSED ON ALL MONEY 30 DAYS OR MORE PAST DUE.
COLOR CONSISTENCY OF CONCRETE IS NOT GUARANTEED UNLESS ARCHITECTURAL CONCRETE ORDERED.
FAILURE TO ADEQUATELY CURE CONCRETE VOIDS ALL WARRANTIES.
| CONCRETE READY-MIX | |
|---|---|
| HEALTH | 2 |
| FLAMMABILITY | 0 |
| REACTIVITY | 1 |
| PERSONAL PROTECTION | X |
WARNING! CAUSES IRRITATION
Avoid contact with eyes, skin, and clothing. Wash thoroughly after handling. Exposure may result injury of the skin or eyes from alkali in Portland Cement. Seek medical attention.
| SUBTOTAL | $0.00 |
|---|---|
| TAX | $0.00 |
| TOTAL | $0.00 |
BUYER'S COPY NO. 1
INVOICE
SILVI CONCRETE OF DOWNINGTOWN, LLC.
355 Newbold Road
Fairless Hills, PA 19030
215 295-0777
FAX: 215-295-0830
APPROVED BY: _______________
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: _______________
| Invoice Date | 10/28/2010 | |
|---|---|---|
| Customer No. | EAST0506 | |
| Invoice Number | 2122221 | Page 1 |
| Job Id | RIDLEY CR SEWER | |
| Credit Terms | MTH END FWLING | |
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
| Date | Ticket | Qty | Description | Price | Taxbl Amt | Exmpt Amt |
|---|---|---|---|---|---|---|
| 10/28/10 | 875483 | 2.00 | 3500 AE | 59.50 | 119.00 | |
| 10/28/10 | 875483 | 1.00 | FLAT RATE CHARGE - PA | 220.00 | 220.00 | |
| 10/28/10 | 875483 | 2.00 | FIBER AD 1LB PER YD | 8.90 | 17.80 |
ok TRS 11/9
Total CUBIC YARDS 2.00
A FINANCE CHARGE OF 1.5% WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE CHARGED ON ALL INVOICES NOT PAID BY THE END OF THE NEXT SUCCEEDING CALENDAR MONTH FROM THE DATE OF THE INVOICE
| Sub-Total | 356.80 | |
|---|---|---|
| Non-Tax Total | 0.00 | |
| Sales Tax- | PA | 21.41 |
| Invoice Total | 378.21 |
SILVI CONCRETE OF CHESTER COUNTY, LLC
DOWNINGTOWN PLANT
MAIN OFFICE • MAILING ADDRESS
355 NEWBOLD ROAD, FAIRLESS HILLS, PA 19030
(215) 295-0777 www.silvi.com
FOR CONCRETE DELIVERIES: 1-800-426-6273
7543
ANY AND ALL WARRANTIES SHALL BE VOIDED WHEN EXTERIOR CONCRETE IS NOT PLACED IN ACCORDANCE WITH ACI318 WHICH REQUIRES A MINIMUM OF 4000 PSI AIR ENTRAINED CONCRETE THAT IS PROPERLY CURED AND SEALED.
CONTACT BETWEEN DEICING SALTS AND CONCRETE CAUSES SURFACE DETERIORATION.
PURCHASER MUST PROVIDE AN AREA FOR TRUCKS TO WASH DOWN CHUTE AFTER DISCHARGE.
| CYLINDERS TAKEN | YES □ NO ✓ |
|---|---|
| SLUMP TEST | YES □ NO ✓ |
| AIR TEST | YES □ NO ✓ |
| 10-1 Load | 10-2 Leave Plant | 10-3 Arrive Job Site | 10-5 Start Discharge | 10-6 Finish Disch. | 10-9 Leave Job Site | 10-10 Arrive Plant |
|---|---|---|---|---|---|---|
| 7:26 | 7:29 | 8:11 | 8:14 | 8:30 | 8:42 | 9:09 |
ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS STRENGTH.
ANY WATER ADDED IS AT CUSTOMERS RISK.
WATER ADDED ON JOB AT CUSTOMERS REQUEST _______ GAL.
MATERIALS, WATER ADDED, TRUCK TIMES, TESTS, WARNINGS AND CONDITIONS (SEE BACK) ARE CONFIRMED AND ACCEPTED BY X ________ INITIAL _____
PURCHASER IS RESPONSIBLE FOR ALL DAMAGE BY OR TO SELLER'S TRUCK AFTER LEAVING STREET AND FOR ALL RESULTING LIABILITY, DAMAGE, LOSS OR EXPENSE TO SELLER OR PROPERTY OWNER, INCLUDING TOW TRUCK AND LANDSCAPING CHARGES.
ANY CONCRETE THAT HARDENS IN THE TRUCKS BARREL OR MUST BE DISCHARGED ON THE GROUND TO AVOID HARDENING IN THE BARREL IS THE PURCHASER'S RESPONSIBILITY. ANY CONCRETE THAT HARDENS IN THE FORMS PRIOR TO BEING FINISHED IS ALSO THE PURCHASER'S RESPONSIBILITY.
| Plant 1 |
Ticket No. 875483 |
Truck 102 |
Load Size 2.00 |
Mix 3535, 3500 AE |
Slump 5.00 |
Use | Date 10/28/2010 |
|---|---|---|---|---|---|---|---|
| Customer No. AST0506 |
Sold To EAST GOSHEN TOWNSHIP |
Tx Cd 0 |
Driver FALOWSKI, DENNIS |
||||
| Delivery Address TAl*RIDLEY CREEK SEWAGE PLANT |
P.O. No. | Order No. 320001 |
|||||
| Instructions 1751 TOURNE DRIVE: 202 EXIT(BOOT ROAD) MAKE A LEFT L PAOLI PIKE GO PAST TOWNSHIP BLDG R 352 L EAST BOOT ROAD R LINE |
|||||||
| LOAD QUANTITY | CUMULATIVE QUANTITY | ORDERED QUANTITY | PRODUCT CODE | PRODUCT DESCRIPTION | UNIT OF MEASURE | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| 2.00 | 2.00 | 2.00 | 3535 | 3500 AE | CY | 0.00 | 0.00 |
| 1 | 1 | 1 | FRCP | FLAT RATE CHARGE | CY | 0.00 | 0.00 |
| 2 | 2 | 2 | 1A1 | FIBER AD 1LB PER | CY | 0.00 | 0.00 |
MINUTES PER YD. ALLOWED FOR UNLOADING, ADDITIONAL TIME WILL BE BILLED.
FINANCE CHARGE OF 18% APR WILL BE ASSESSED ON ALL MONEY 30 DAYS OR MORE PAST DUE.
COLOR CONSISTENCY OF CONCRETE IS NOT GUARANTEED UNLESS ARCHITECTURAL CONCRETE ORDERED.
FAILURE TO ADEQUATELY CURE CONCRETE VOIDS ALL WARRANTIES.
| CONCRETE READY-MIX | |
|---|---|
| HEALTH | 2 |
| FLAMMABILITY | 0 |
| REACTIVITY | 1 |
| PERSONAL PROTECTION | X |
WARNING! CAUSES IRRITATION
Avoid contact with eyes, skin, and clothing. Wash thoroughly after handling. Exposure may result injury of the skin or eyes from alkali in Portland Cement. Seek medical attention.
| SUBTOTAL | $0.00 |
|---|---|
| TAX | $0.00 ok |
| TOTAL | $0.00 |
BUYER'S COPY NO. 1
SILVI CONCRETE OF DOWNINGTOWN, LLC. - INVOICE
355 Newbold Road
Fairless Hills, PA 19030
215 295-0777
FAX: 215-295-0630
APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: ___________________
Invoice Date: 10/18/2010
Customer No.: EAST0506
Invoice Number: 2122144 Page 1
Job Id: RIDLEY CR SEWER
Credit Terms: MTH END FWLING
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
| Date | Ticket | Qty | Description | Price | Taxbl Amt | Exmpt Amt |
|---|---|---|---|---|---|---|
| 10/18/10 | 873954 | 4.00 | 3500 AE | 59.50 | 238.00 | |
| 10/18/10 | 873954 | 1.00 | TEST CYLINDERS | 2.50 | 2.50 | |
| 10/18/10 | 873954 | 1.00 | FLAT RATE CHA | 220.00 | ||
| 10/18/10 | 873954 | 4.00 | FIBER AD 1LB B | 35.60 | ||
| 10/18/10 | 873954 | 1.00 | WAITING TIME | 25.00 |
Ridley Creek Exp.
Construction Acct.
These 3 invoices were paid in November (per Rick) to be approved in December.
R/C
New Sidew
ok rs 11/9
Total CUBIC YARDS 4.00
A FINANCE CHARGE OF 1.5% WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE CHARGED ON ALL INVOICES NOT PAID BY THE END OF THE NEXT SUCCEEDING CALENDAR MONTH FROM THE DATE OF THE INVOICE
| Item | Amount |
|---|---|
| Sub-Total | 521.10 |
| Non-Tax Total | 0.00 |
| Sales Tax- PA | 31.27 |
| Invoice Total | 552.37 |
SILVI CONCRETE OF CHESTER COUNTY, LLC
DOWNINGTOWN PLANT
MAIN OFFICE • MAILING ADDRESS
355 NEWBOLD ROAD, FAIRLESS HILLS, PA 19030
(215) 295-0777 www.silvi.com
FOR CONCRETE DELIVERIES: 1-800-426-6273
73988
ANY AND ALL WARRANTIES SHALL BE VOIDED WHEN EXTERIOR CONCRETE IS NOT PLACED IN ACCORDANCE WITH ACI318 WHICH REQUIRES A MINIMUM OF 4000 PSI AIR ENTRAINED CONCRETE THAT IS PROPERLY CURED AND SEALED.
CONTACT BETWEEN DEICING SALTS AND CONCRETE CAUSES SURFACE DETERIORATION.
PURCHASER MUST PROVIDE AN AREA FOR TRUCKS TO WASH DOWN CHUTE AFTER DISCHARGE.
| CYLINDERS TAKEN | YES □ NO □ |
|---|---|
| SLUMP TEST | YES □ NO □ |
| AIR TEST | YES □ NO □ |
| 10-1 Load | 10-2 Leave Plant | 10-3 Arrive Job Site | 10-5 Start Discharge | 10-6 Finish Disch. | 10-9 Leave Job Site | 10-10 Arrive Plant |
|---|---|---|---|---|---|---|
| : | 8:39 | 9:09 | 9:17 | 9:50 | 10:02 | 10:24 |
ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS STRENGTH.
ANY WATER ADDED IS AT CUSTOMERS RISK.
WATER ADDED ON JOB AT CUSTOMERS REQUEST _______ GAL.
MATERIALS, WATER ADDED, TRUCK TIMES, TESTS, WARNINGS AND CONDITIONS (SEE BACK) ARE CONFIRMED AND ACCEPTED BY X ________ INITIAL _____
PURCHASER IS RESPONSIBLE FOR ALL DAMAGE BY OR TO SELLER'S TRUCK AFTER LEAVING STREET AND FOR ALL RESULTING LIABILITY, DAMAGE, LOSS OR EXPENSE TO SELLER OR PROPERTY OWNER, INCLUDING TOW TRUCK AND LANDSCAPING CHARGES.
ANY CONCRETE THAT HARDENS IN THE TRUCKS BARREL OR MUST BE DISCHARGED ON THE GROUND TO AVOID HARDENING IN THE BARREL IS THE PURCHASER'S RESPONSIBILITY. ANY CONCRETE THAT HARDENS IN THE FORMS PRIOR TO BEING FINISHED IS ALSO THE PURCHASER'S RESPONSIBILITY.
| Plant 1 |
Ticket No. 873954 |
Truck 409 |
Load Size 4.00 |
Mix 3535, 3500 AE |
Slump 5.00 |
Use | Date 10/18/2010 |
|---|---|---|---|---|---|---|---|
| Customer No. AST0506 |
Sold To EAST GOSHEN TOWNSHIP |
Tx Cd 0 |
Driver HOLMES, OLLIE |
||||
| Delivery Address TEST CYL*FAK RIDLEY CREEK SEWER |
P.O. No. | Order No. 319323 |
|||||
| Instructions 1751 TOURNE DRIVE: 202 EXIT(BOOT ROAD) MAKE A LEFT L PAOLI PIKE GO PAST TOWNSHIP BLGD R-352 L-EAST BOOT ROAD R-LINE |
|||||||
| LOAD QUANTITY | CUMULATIVE QUANTITY | ORDERED QUANTITY | PRODUCT CODE | PRODUCT DESCRIPTION | UNIT OF MEASURE | UNIT PRICE | AMOUNT |
|---|---|---|---|---|---|---|---|
| 4.00 | 4.00 | 4.00 | 3535 | 3500 AE | CY | 0.00 | 0.00 |
| 1 | 1 | 1 | FRCP | FLAT RATE CHARGE | CY | 0.00 | 0.00 |
| 1 | 1 | 1 | TC | TEST CYLINDERS | ea | 0.00 | 0.00 |
| 4 | 4 | 4 | 1A1 | FIBER AD 1LB PER | CY | 0.00 | 0.00 |
MINUTES PER YD. ALLOWED FOR UNLOADING, ADDITIONAL TIME WILL BE BILLED.
FINANCE CHARGE OF 18% APR WILL BE ASSESSED ON ALL MONEY 30 DAYS OR MORE PAST DUE.
COLOR CONSISTENCY OF CONCRETE IS NOT GUARANTEED UNLESS ARCHITECTURAL CONCRETE ORDERED.
FAILURE TO ADEQUATELY CURE CONCRETE VOIDS ALL WARRANTIES.
| CONCRETE READY-MIX | |
|---|---|
| HEALTH | 2 |
| FLAMMABILITY | 0 |
| REACTIVITY | 1 |
| PERSONAL PROTECTION | X |
WARNING! CAUSES IRRITATION
Avoid contact with eyes, skin, and clothing. Wash thoroughly after handling. Exposure may result injury of the skin or eyes from alkali in Portland Cement. Seek medical attention.
| SUBTOTAL | $0.00 |
|---|---|
| TAX | $0.00 |
| TOTAL | $0.00 |
BUYER'S COPY NO. 1
Martin LIMESTONE
MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354.1300 • FAX (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE
APPROVED BY: _______________
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: _______________
-- INVOICE --
| SOLD TO: | EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER PA 19830 |
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR. |
|---|
| TERMS: NET 30 DAYS | INVOICE NUMBER | 303385 |
|---|
| INVOICE DATE 10/25/10 |
CUST. ACCT. NO. 016716 |
CUST. JOB NO. | CUST. P.O. NO. | ZONE 7 |
|---|---|---|---|---|
| JOB NAME 1751 TOWN DRIVE-SEWER PLANT |
PLANT 01 WEAVERLAND |
|||
| DATE SHIPPED | TICKET NO. | QUANTITY | UM | PRICE | DESCRIPTION | AMOUNT |
|---|---|---|---|---|---|---|
| 10/18/10 | A053490 | 23.84 | TN | 12.410 | 2A 21.63 | 295.85 |
| 10/20/10 | A053703 | 23.99 | TN | 12.410 | 2A 21.76 | 297.72 |
OK TRS 11/9
1 of 3
| [X] TAX EXEMPT | TOTAL TONS 47.83 |
TOTAL SALE 593.57 |
TRUCK CHARGES .00 |
SALES TAX .00 |
|---|
| TOTAL | 593.57 |
|---|
| EAST GOSHEN TOWNSHIP | ACCOUNT 016716 |
DATE 10/25/10 |
INVOICE NO. 303385 |
AMOUNT 593.57 |
|---|---|---|---|---|
| PAY BY | M164 | |||
MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT
Martin LIMESTONE
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202
PLANT 01 WEAVERLAND Phone: 717-354-1370
| ORDER NO. 1007160020 |
TICKET NUMBER 0101A053703 |
SCALE 1 |
AUTO/MANUAL A |
DATE 10/20/2010 |
TIME 10:53 AM |
|---|---|---|---|---|---|
| SOLD TO EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER 016716 PHONE 610-692-7171 PO |
||||
| SHIP TO | QUOTE 1001040002 STATE ZONE 7 |
||||
| PRODUCT ID 11 - 421 |
PRODUCT DESCRIPTION 2A |
□ EXTRA CHARGE, PLOWED/NOT WORKED □ EXTRA CHARGE, LESS THAN 1 TON/ACRE |
|||
| JOB NAME / LOCATION 1751 TOWN DRIVE-SEWER PLANT WEST CHESTER |
JOB | ITEM | |||
| JOB REQUIRED NUMBERS | |||||
| TAG NO. NA |
AXLES 4 |
TRUCK HH699 |
CARRIER NAME PAUL M. MARTIN TRUCKING, LLC |
CARRIER CODE 699 |
|
| PICK-UP | FREIGHT PPD XX |
FREIGHT COLLECT | ACCUMULATIVE QUANTITIES | PAYMENT METHOD BILLABLE |
|---|
| U.S. WEIGHT 73,020 |
METRIC WEIGHT | ORDERED 200.00 |
MATERIAL |
|---|---|---|---|
| 25,040 | GROSS TODAY 23.99 LOADS 1 |
HAUL | |
| 47,980 | TARE TO DATE 193.38 LOADS 8 |
ADD'L CHARGES | |
| 23.99 | TN | NET ACCUMULATED CASH SALE |
TAX |
| WEIGHED BY CYNTHIA M KOCHEL |
016049 | TOTAL THIS LOAD ▸ | |
|---|---|---|---|
| INSPECTOR'S SIGNATURE | JOB ARRIVAL TIME | JOB DEPARTURE TIME | |
| RECEIVED ABOVE MATERIAL IN GOOD CONDITION X [Signature] |
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE. | ||
322 east, 50 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left.
*** Back In Drive ***
mark 610-656-2742.
ok TRS 11/9
2 of 3
APPROVED BY: M[illegible]
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: 07424 7454 Paving Lot
YOUR BUSINESS IS GREATLY APPRECIATED.
CUSTOMER'S COPY
01-0101A053703 *
Martin LIMESTONE
Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202
PLANT 01 WEAVERLAND Phone: 717-354-1370
| ORDER NO. 1007160020 |
TICKET NUMBER 0101A053490 |
SCALE 1 |
AUTO/MANUAL A |
DATE 10/18/2010 |
TIME 01:20 PM |
|---|---|---|---|---|---|
| SOLD TO EAST GOSHEN TOWNSHIP 1580 PAOLI PK WEST CHESTER, PA 19830 |
CUSTOMER 016716 PHONE 610-692-7171 PO |
||||
| SHIP TO | QUOTE 1001040002 STATE ZONE 7 |
||||
| PRODUCT ID 11 - 421 |
PRODUCT DESCRIPTION 2A |
□ EXTRA CHARGE, PLOWED/NOT WORKED □ EXTRA CHARGE, LESS THAN 1 TON/ACRE |
|||
| JOB NAME / LOCATION 1751 TOWN DRIVE WEST CHESTER |
JOB | ITEM | |||
| JOB REQUIRED NUMBERS | |||||
| TAG NO. NA |
AXLES 4 |
TRUCK HH619 |
CARRIER NAME NEAL M MARTIN |
CARRIER CODE 619 |
|
| PICK-UP | FREIGHT PPD XX |
FREIGHT COLLECT | ACCUMULATIVE QUANTITIES | PAYMENT METHOD BILLABLE |
|---|
| U.S. WEIGHT 72,560 |
METRIC WEIGHT | ORDERED 200.00 |
MATERIAL |
|---|---|---|---|
| 24,880 | GROSS TODAY 23.84 LOADS 1 |
HAUL | |
| 47,680 | TARE TO DATE 169.39 LOADS 7 |
ADD'L CHARGES | |
| 23.84 | TN | NET ACCUMULATED CASH SALE |
TAX |
| WEIGHED BY CYNTHIA M KOCHEL |
016049 | TOTAL THIS LOAD ▸ | |
|---|---|---|---|
| INSPECTOR'S SIGNATURE | JOB ARRIVAL TIME | JOB DEPARTURE TIME | |
| RECEIVED ABOVE MATERIAL IN GOOD CONDITION X [Signature] |
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE. | ||
322 east, 30 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left.
*** Back In Drive ***
mark 610-656-2742.
3 of 3
APPROVED BY: [Signature]
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: 01454 7350
07424 7454
YOUR BUSINESS IS GREATLY APPRECIATED.
CUSTOMER'S COPY
01-0101A053490 *
5 - 3.379
| ZONE 0 |
ACCOUNT NO. 000531 |
DATE 11-2-10 |
DRIVER Kevin |
TRUCK I.D. 14 |
NEXT DELIVERY 300 |
|---|---|---|---|---|---|
| TYPE 60 |
KIND 15 |
PHONE NO. 692-7171 |
.00000 | TANK SIZE 2500 |
LOC. OPTIMUM 0 |
WE RESERVE THE RIGHT TO MAKE A FINANCE CHARGE COMPUTED BY A "PERIODIC RATE OF 1.5% PER MONTH WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% ON AMOUNTS PAST DUE 30 DAYS OR MORE AND TO ADD ALL COLLECTION FEES.
Ridley Pump Station
Back-up Generators
31109
Reilly & Sons, Inc.
601 E. LINCOLN HIGHWAY
P.O. BOX 183, EXTON, PA 19341
(610) 363-7225
A FAMILY OWNED BUSINESS SINCE 1976
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6199
#2 ULSD, 15 PPM, ON ROAD DIESEL
A/G TANK, IN PARKING LOT
FEDERAL & STATE TAX EXEMPT
INVOICE-MAILBOX BK OF GARAGE
[VISA] [MasterCard]
THIS IS YOUR INVOICE PAYABLE IN 10 DAYS
(HEATING OIL) DYED LSD 500 PPM MAX, NON-ROAD/TAX-EXEMPT
(DYED OFF-RD DIESEL) NOT FOR USE IN 2007 AND LATER VEHICLES/ENGINES
| DATE | 11/02/10 | TIME | 13:03 |
|---|---|---|---|
| TRUCK NUMBER | 14 | ||
| DRIVER NUMBER | 1 | ||
| SALES NUMBER | 17582 | ||
| GALLONS START | .0 | ||
| GALLONS FINISH | 333.0 | ||
| PRICE/GALLON | 3.3790 | ||
| PRODUCT COST | 1125.21 | ||
| DYED 15 ULSD | |||
| TAX EXEMPT | |||
| TOTAL COST | 1125.21 | ||
ok TRS
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 8, 2010
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday November 8, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Jack Yahraes, Fran Beck, Dana Pizarro, and Joseph McCawley. Also in attendance were: Rick Smith, Township Manager; Mark Miller, Director of Public Works; Scott Fowler from Brickhouse Environmental; Dan Barbato from Pennoni; and Bob Adams, Authority Solicitor;
COMMON ACRONYMS:
MA- Municipal Authority
HC – Historical Commission
PC – Planning Commission
CB – Conservancy Board
PR – Park & Recreation Board
BOS – Board of Supervisors
SSO – Sanitary System Overflow
I&I – Inflow & Infiltration
RCSTP – Ridley Creek Sewer Treatment Plant
LCSTP – Lochwood Chase Sewer Treatment Plant
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
NPDES – National Pollutant Discharge Elimination System
WAS – Waste Activated Sludge
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.
At 7:05 pm Fran moved to go into Executive Session. Joe seconded the motion. The motion passed unanimously. The Executive Session ended at 7:15 pm and the regular meeting started.
2. RCSTP REPORTS
A. Brickhouse Report
Scott reported that all four (4) Phases of the Ridley Creek Sewage Treatment Plant Upgrade and expansion were completed during October 2010. The Authority's Engineer accepted substantial completion dates for Wm. Clinger Corporation and Worth & Company as September 17, 2010 and October 21, 2010 respectively.
The Authority's Engineer issued "punch lists" to the contractors on October 14, 2010. Both Contractors have worked towards resolving the issues to achieve final project completion. Completion of the punch list work is anticipated on or before November 30, 2010.
EGTMA Staff installed base paving within the facility perimeter with plans for final paving during 2011. Concrete pads at the entrance doors for all of the buildings and sidewalks along the existing control building North side were installed by the Township staff. Installation of the new fence along the perimeter of the facility was completed.
The SBR treatment process is achieving the current permit discharge limitations and, sampling for the new permit discharge limitations was initiated the week of October 25, 2010. Review of the final effluent total nitrogen and phosphorus laboratory test results are planned for developing an initial indicator of the plant's performance. Aluminum sulfate chemical feed systems are planned to be placed in service during the week of November 8, 2010 to being lowering the final effluent total phosphorus concentration to 0.5mg/L.
MA Minutes 11/08/2010 1
The Siemens warranty performance testing of the treatment system is scheduled to begin November 29, 2010 with the centrifuge dewatering system testing anticipated for mid December 2010. Implementation of the new NPDES final effluent discharge requirements is planned for first quarter 2011. Prior to implementing the new discharge permit limitations, representatives from PADEP are planned to be invited to visit the facility and review operations.
The SBR power failed. Today some wires were burned. The alarm system did not call out. Clinger is responsible for all electric. The electrical study will cost between $5,000 - $8,000 in case the Municipal Authority has to get a third party to do the study.
B. Pennoni – Dan Barbato, reported the following:
RCSTP Upgrade and Expansion
- Construction phase services have transitioned to punch list monitoring, review of operations and maintenance submittals, and startup assistance, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Birckhouse and the Township, and approval of contractor Payment Requests.
- A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
- Worth & Company and Clinger Corporation are working on punch list completion and outstanding items are expected to be complete by the end of November.
- Pennoni will complete review of the Operations and Maintenance submittals by the end of November.
I/I Metering Project
- The Township continues to meter flows at selected locations. Pennoni provided recommendations for meters locations for the next round of data collection, and we will review the data when it is available.
Ridley Creek Consent Order
- The Semi-Annual Report due on September 30 was prepared and submitted to DEP on September 28 as required by the CO&A. The next report is due to DEP in March of 2011.
LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning
- These documents were provided to the Township for submittal to DEP. The Township received comments from DEP and we are in the process of addressing. We anticipate completing the responses in early December.
Marydell PS Elimination Planning
- The draft report sections for the Act 537 Plan Revision are being assembled and a determination will be made in the next week regarding the schedule to finish and submit the report and required notifications.
Wastewater Contract Operations Bid
We are assisting with responses to bidder questions on the RFP.
MA Minutes 11/08/2010 2
Applebrook Comprehensive Groundwater Evaluation
- Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The Evaluation is in progress and we recently received responses to our data request needed to complete the report. We anticipate completing the report in November.
C. Cost Summary – None
D. Change Orders – The outstanding Worth & Company change orders and recommendations from Rick were reviewed with the following results:
March 26, 2010 – Extension due to problems with Seimens and March 26, 2010 – Extension due to Clinger. Joe moved to deny both requests as recommended. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
PCO 12 – Additional steel beam in SBP building - $4,703.27 and PCO 13 – Control Joint Modification in Screen Building - $4,499.12. Fran moved to approve payment of these 2 change orders and back charge half of the cost to Pennoni. Dana seconded the motion and pointed out that Evan previously conceded these costs. There was no further discussion. The motion passed unanimously.
PCO 11, PCO 14, and PCO 18 are on hold until more information is available.
3. RCSTP INVOICES
A. Fran moved to approve payment for the following invoices. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
| a. | Gawthrop Greenwood, #82932, 9/20/10 | $ 1,242.50 |
|---|---|---|
| b. | O'Rourke and Sons, #164372, 10/7/10 | $ 665.00 |
| c. | Charles Blosendki Disposal, 10/18/10 | $ 2,531.00 |
| d. | Power Pro Equipment, #P32279, 10/13/10 | $ 129.48 Credit |
| e. | Power Pro Equipment, #P32136, 10/5/10 | $ 2,073.90 |
| f. | Power Pro Equipment, #P32515, 10/27/10 | $ 17.50 |
| g. | Martin Limestone, #302736, 10/18/10 | $ 577.93 |
| h. | Martin Limestone, #302737, 10/18/10 | $ 296.35 |
| i. | Martin Limestone, #302735, 10/18/10 | $ 299.83 |
| j. | Vimco, #339422, 10/21/10 | $ 270.75 |
| k. | Ransome Rental Co., #K0312001, 10/20/10 | $ 608.00 |
| l. | Ransome Rental com. #K0308701, 10/25/10 | $ 1,984.00 |
| m. | Yerkes Assoc., #38547, 10/5/10 | $ 571.88 |
| n. | Pennoni, #454783, 10/27/10 | $ 12,326.15 |
| o. | Pennoni, #454693, 10/27/10 | $ 1,620.00 |
| p. | Brickhouse Environmental, #5596, 11/1/10 | $ 517.50 |
| q. | Brickhouse Environmental, #5595, 11/1/10 | $ 8,826.25 |
B. After discussion Joe moved to approve payment for the following invoice:
Worth & Co., P28001, 10/31/10 $224.000.00
MA Minutes 11/08/2010 3
Fran seconded the motion. There was no further discussion or comment. The motion passed unanimously.
4. CHAIRMAN'S REPORT
Jack reported that West Goshen is changing their attorney.
He also reported that Mike Steinberger formally resigned from the Municipal Authority effective 12/31/10.
5. APPROVAL OF MINUTES
A. Fran moved to approve the minutes of the October 11, 2010 as corrected. Dana seconded the motion. The motion passed unanimously.
6. ENGINEER'S REPORT – See 2B.
7. APPROVAL OF INVOICES
A. Joe moved to approve payment for the following invoices. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
| a. | Gawthrop Greenwood, 82931, 9/30/10 | $ 475.00 |
|---|---|---|
| b. | Pennoni, #454694, 10/27/10 | $ 603.75 |
| c. | Pennoni, #454595, 10/27/10 | $ 1,548.75 |
| d. | Pennoni, #454693, 10/27/10 | $ 1,620.00 |
| e. | Martin Limestone, #302737, 10/18/10 | $ 294.86 |
Note: Invoice for Martin Limestone, #302735, 10/18/10, $300.20 was not a Municipal Authority expense.
8. LIAISON REPORTS
A. Jack reported for Megann Hedgecock of the Planning Commission. The applications discussed were AT&T to upgrade their cell tower on Strasburg Road, CTDI to expand parking and Cavalli to construct a detached 2-car garage.
9. FINANCIAL REPORTS
None
10. GOALS
Dana will provide an article by Nov. 11, 2010 for the next Township newsletter.
11. OLD BUSINESS
None
12. NEW BUSINESS
A. Bids to perform the Performance Test were received from four labs. Mark recommended Lancaster. Dana asked him to check if there is a Data Package and which type. Mark will check on this. Dana moved to approve Lancaster Labs for $9,478.00 pending clarification of the Data Package. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
MA Minutes 11/08/2010 4
B. Joe moved to reappoint Gawthrop Greenwood as the Municipal Authority's attorney for 2011 with no change in fees. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
C. Joe moved to continue Brickhouse Environmental as project manager. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
D. Joe moved to approve Maillie, Falconiero & Co. as auditor for 2010 at $7,500.00. Fran seconded the motion. There was no further discussion. The motion passed unanimously.
E. Fran moved to authorize Mark Miller to purchase a stainless steel lift chain for the removal of pumps in the SBRS at a cost of $2,483.00. Joe seconded the motion. There was no further discussion. The motion passed unanimously.
13. CAPACITY REQUESTS
A. None
14. SEWER REPORTS
A. Mark Miller reported the following:
Meters – The meters were read on a daily basis. Meters were calibrated during the month on October. The meter at the Hershey's Mill Pump Station was knocked out of service due to flooding. Allied Control pulled the meter and made repairs and placed back in service.
CC Collection – The Public Works Department responded to several calls for missing caps.
RC Collection – We located significant INI in the line between Paoli Pike and North Chester Road estimated at 20,000 gallons a day. We were able to narrow down the INI by the use of portable meters. We also received odor complaints from the Fair Way Village. The timing on the pumps was changed to alleviate the effluent going septic.
Ridley Creek Plant – The paving of the plant has been completed. Once the staging area is restored, we will then finish paving the driveway.
Complete items for the month – Fencing, seeded and strawed, storm drains/downspouts all piped PWD and side walks & blacktop are done.
15. ANY OTHER MATTER
None
16. CORRESPONDENCE
None
17. PUBLIC COMMENT
None
MA Minutes 11/08/2010 5
18. ADJOURNMENT
There being no further business, Fran moved to adjourn the meeting. Joe seconded the motion. The meeting was adjourned at 8:30 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 11-08-10 Draft.doc
MA Minutes 11/08/2010 6
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | West Chester, PA 19381-0562
(p) 610-696-8225 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
CCI
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Page: | 1 |
|---|---|
| 11/30/2010 | |
| Client No: | 6604-01M |
| Invoice No. | 84385 |
General Authority Services
Fees
| Hours | |||
|---|---|---|---|
| 11/08/2010 RFA |
Review packet for 11/8/10 Authority meeting; attend regular meeting of Municipal Authority. | 2.00 | |
| For Current Services Rendered | 2.00 | 380.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.00 | $190.00 | $380.00 |
| Previous Balance | $1,254.00 |
|---|---|
| Total Current Charges | 380.00 |
| 11/16/2010 Fee Payment | -1,254.00 |
| Balance Due | $380.00 |
ok RS
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 457260 Invoice Date : 11/23/2010 Project : EGMA1002 Project Name : Applebrook Comp. Groundwater Eval. |
|---|
For Services Rendered through: 11/07/2010
Visit to Applebrook to locate wells and water contours, review hydrogeology, request data from Client.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,785.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,785.00 | |
| Amount Due This Invoice | $1,785.00 |
| Fee : | 5,500.00 |
|---|---|
| Prior Billings : | 1,548.75 |
| Current Billings : | 1,785.00 |
| Total Billings : | 3,333.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Senior Engineer | 17.00 | 105.00 | 1,785.00 |
| Labor Total: | 17.00 | 1,785.00 |
| Total Phase : **** -- Professional Services | Labor : | $1,785.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1002 -- Applebrook Comp. Groundwater Eval. | Labor : | $1,785.00 |
|---|---|---|
| Expense : | $0.00 |
ok TRS
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1002 Invoice Summary.xlsx
Invoice Date 11-23-2010
| Project: | Applebrook Comp. Groundwater Eval. | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA 1002 | |||
| Invoice No: | 457260 | |||
| Invoice Period: | 10/18/2010 | to | 11/7/2010 | |
| Initial Authorization: | $ 5,500.00 | Date: | 9/20/2010 | |
| Changes: | $ - | Date: | ||
| Contract Amount: | $ 5,500.00 | |||
| Previously Invoiced: | $ 1,548.75 | |||
| Current Invoice: | $ 1,785.00 | |||
| Invoiced to Date ($): | $ 3,333.75 | |||
| Invoiced to Date (%): | 61% | |||
| Remaining Budget ($): | $ 2,166.25 | |||
| Remaining Budget (%): | 39% | |||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Applebrook Comp. |
| Phase Budget: | $ 5,500.00 |
| Previously Invoiced: | $ 1,548.75 |
| Current Invoice: | $ 1,785.00 |
| Invoiced to Date ($): | $ 3,333.75 |
| Invoiced to Date (%): | 61% |
| Remaining Budget ($): | $ 2,166.25 |
| Remaining Budget (%): | 39% |
Comments: Visit to Applebrook to locate wells and water contours, review hydrogeology, request data from Client.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Philadelphia, PA
215-222-3000 Fax: 215-222-3588
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 457259 Invoice Date : 11/23/2010 Project : EGMA1000 Project Name : 2010 Annual Services |
|---|
For Services Rendered through: 11/07/2010
Preparation of monthly report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 105.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 105.00 | |
| Amount Due This Invoice | $105.00 |
| Fee : | 13,338.25 |
|---|---|
| Prior Billings : | 10,942.00 |
| Current Billings : | 105.00 |
| Total Billings : | 11,047.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.00 | 105.00 | 105.00 |
| Labor Total: | 1.00 | 105.00 |
| Total Phase : **** -- Professional Services | Labor : | $105.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1000 -- 2010 Annual Services | Labor : | $105.00 |
|---|---|---|
| Expense : | $0.00 |
ok TRS
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1000 Invoice Summary.xls
Invoice Date 10-27-2010
| Project: | 2010 Annual Services | |||
|---|---|---|---|---|
| Pennoni Job No.: | EGMA 1000 | |||
| Invoice No: | 457259 | |||
| Invoice Period: | 10/18/2010 | to | 11/7/2010 | |
| Initial Authorization: | $ 10,338.25 | Date: | 1/11/2010 | |
| Changes: | $ 3,000.00 | Date: | ||
| Contract Amount: | $ 13,338.25 | |||
| Previously Invoiced: | $ 10,942.00 | |||
| Current Invoice: | $ 105.00 | |||
| Invoiced to Date ($): | $ 11,047.00 | |||
| Invoiced to Date (%): | 83% | |||
| Remaining Budget ($): | $ 2,291.25 | |||
| Remaining Budget (%): | 17% | |||
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2010 Annual Services |
| Phase Budget: | $ 13,338.25 |
| Previously Invoiced: | $ 10,942.00 |
| Current Invoice: | $ 105.00 |
| Invoiced to Date ($): | $ 11,047.00 |
| Invoiced to Date (%): | 83% |
| Remaining Budget ($): | $ 2,291.25 |
| Remaining Budget (%): | 17% |
Comments: Preparation of monthly report.
2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
DECEMBER REPORT
ON-GOING
- Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - Completed; Need by 8/11/10 Joe – Mark - Completed; Need by 11/10/10 Dana
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana – Not Completed; 3 rd Quarter (September) Joe - Completed - Attended the August meeting; 4 th Quarter (December) Jack
- Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10). West Pike Township request received on August 6, 2010, MA directed staff to look into on August 9, 2010 - Engineer’s response 12/9/10
- Implement I&I Plan. – Completed and Ongoing – March Report filed on time, September Report filed in time, I&I repair work continues.
- Conduct a sewer facilities tour after RCSTP construction is complete
RIDLEY CREEK PROJECT
- Monitor construction. Substantial Completion October 21, 2010
- Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. Completed - SBR Tour conducted on 3/15/10
- Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. Completed - SBR Class conducted on 3/15/10
- Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)
ACT 537 PLANNING
- Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. BoS adopted Resolution 10-106 on 6/15/2010. Revisions sent to PA DEP on 6/16/10. Received DEP 7/13/10 review letter. Currently working on response.
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\121310.doc
- Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. BoS adopted resolutions 10-105 and 10-108 on 6/15/10. Revisions sent to PA DEP on 6/16/10. Received DEP 7/14/10 review letter. Currently working on response.
- Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
- Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
- Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Obtained agreement on diversion from West Goshen on 5/13/10.
FUNDING
- H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. Completed - We have received the money. Used grant money to pay Worth and Clinger August invoices
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\121310.doc
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
December 9, 2010
EGMA1000
Rick Smith, Township ManagerEast Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: West Pikeland Township Sewer Capacity Request
Dear Mr. Smith:
On August 5, 2010, West Pikeland Township submitted a letter to the East Goshen Municipal Authority requesting the 20,000 gallons per day of sewer capacity on behalf of West Whiteland Township.
The proposal by West Pikeland Township is to divert 20,000 gpd of West Whiteland flow from DARA to the Ridley Creek Sewage Treatment Plant via West Goshen. This would facilitate West Pikeland sending 20,000 gpd to DARA.
We have reviewed this request and in light of the Board’s decision to divert Lochwood Chase to the Ridley Creek Plat, we do not believe that there is adequate infrastructure capacity at this time to accommodate this request. We recommend that the Township decline West Pikeland’s request for sewer capacity.
If you have any questions, please feel free to contact me at (302) 655-4451.
Sincerely,
PENNONI ASSOCIATES INC.
D Barbato
Daniel P. Barbato, P.E.
Authority Engineer
62 Rockford Road • Suite 201 • Wilmington, DE 19806 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
December 8, 2010
EGMA1000
Rick Smith, Township ManagerEast Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Fee Schedule for Year 2011 and Annual Services
East Goshen Township Municipal Authority
Chester County, Pennsylvania
Dear Rick;
Pennoni Associates Inc. is proud to serve East Goshen Municipal Authority as a client and we look forward to working with you in 2011. We enjoy the relationships we have formed with the Authority and are grateful to be part of the organization. We respectfully request reappointment as Authority Engineer for 2011.
The proposed rates shown below do not include increases with the exception of the Authority Engineer rate. Our rate of $105 per hour for Authority Engineer has remained unchanged since 2006. We propose a modest increase to the Authority Engineer rate of $5 per hour, which we believe is competitive and is consistent with most of our Clients.
Our rate increases for 2010 were modest and prior to 2010 our rates were frozen for two years. While our company has many employee classifications, these are the classifications most frequently utilized in performing tasks for our municipal clients. We assign the most appropriate level staff competent to perform the work effort requested.
| Authority Engineer | $110/hr |
|---|---|
| Senior Engineer | $105/hr |
| Project Engineer | $90/hr |
| Staff Engineer | $85/hr |
| Associate Engineer | $80/hr |
| Graduate Engineer | $70/hr |
| Engineering Technician II | $72/hr |
| Engineering Technician I | $65/hr |
As part of our responsibilities to the Authority as the Appointed Engineer, we will provide the following professional services to the Authority:
- Preparation of the Annual Municipal Wasteload Management (Chapter 94) Report to DEP (note that DEP has required that individual reports be prepared for the Ridley Creek STP, Lochwood Chase STP, the West Goshen Service Area, and the Westtown Service Area);
- Participation in monthly meetings of the Authority Board; and,
- Consultation on issues on behalf of the Authority
62 Rockford Road • Suite 201 • Wilmington, DE 19806 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com
EGMA1000
Rick Smith
December 22, 2009
Page 2
Year 2010 Annual Services
The estimated fee for annual services is $10,000 to be billed on an hourly basis at the above rates.
We look forward to continuing to serve the Authority in 2011. If you have any questions, please feel free to contact me at (302) 655-4451.
Very truly yours,
PENNONI ASSOCIATES INC.
D Barbato
Daniel P. Barbato, P.E.
Authority Engineer
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 8, 2010
To: Municipal Authority
From: Mark Miller
Re: December 2010 Monthly Report
Meter: Meters were calibrated for the last quarter. The Public Works employees read the meters on a daily basis. C.C. Collection: We had three lateral clogs, two were caused by children throwing debris down the clean- out pipe.All the pumping stations wet wells were cleaned. New floats were installed at the Ashbridge Pump Station . We also had a problem with the transducer. R.C. Collection: The pumping station was visited on a daily basis no problems to report. Lochwood Plant: The plant was visited on a routine basis. Several trees fell in the spray fields. They are scheduled for removal this month. Ridley Creek Plant: Was visited on a daily basis. Routine maintenance was done to the screen. We ordered a new strainer for the utility water line. The floors in the SBR Building were scrubbed and sealed. Pa One Calls: We received 89 PA One calls for the Month of November. Alarms: 27 alarms for the month of November.
f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority november report doc..doc
ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers
October 19, 2010
Mr. Mark MillerDirector of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Ridley Creek Wastewater Treatment Facility
September 2010 Operations Report
Dear Mr. Miller:
The following is the September 2010 monthly operations report for East Goshen Township’s Ridley Creek Wastewater Treatment Facility.
Treatment plant operations were normal during the month of September 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 2,087,800 gallons, which represents an average daily flow of 231,978 gallons per day.
The influent area operated normally during the month. The muffin monster and influent screen were on line continuously. Debris generated by the unit was disposed of via trash bags. The three (3) raw lift pumps operated normally. No problems were noted with the pumps or associated controls. The soda ash feed system was operational throughout the month, although the feed pump and discharge line continues to clog. The Township has assisted the operator in clearing the discharge line and returning the system to service.
The SBR building operated normally during the month. SBR’s #1, #3, & #4 were in service with the mixed liquor being medium brown colored with a moderate amount of tan surface foam buildup. SBR #2 remained off line. The operator continues to optimize the process to improve effluent quality.
The ultraviolet light disinfection system also operated continuously throughout the month with both light banks being utilized. The system was placed into automatic operation with the light banks alternating.
The effluent system operated normally during the month. The house water system was in service continuously and no problems were experienced with the pumps or controls. The inline screens were cleaned on a regular basis to remove solids and debris buildup. The Applebrooke subdivision effluent pump was in service throughout the month of September. In September we sent approximately 43,018 gallons of effluent to the golf course daily for irrigation needs.
664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com
Construction work continued during the month on the Phase II part of the project. Work included completion of the DAVCO tankage rehabilitation and start-up, centrifuge operations, and control adjustments.
Results of influent and final effluent samples collected during the month indicate compliance with the existing final effluent permit limitations.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator
C Mr. Dan Barbato, P.E. – Pennoni Associates
2
ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers
November 5, 2010
Mr. Mark MillerDirector of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Ridley Creek Wastewater Treatment Facility
October 2010 Operations Report
Dear Mr. Miller:
The following is the October 2010 monthly operations report for East Goshen Township’s Ridley Creek Wastewater Treatment Facility.
Treatment plant operations were normal during the month of October 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 8,895,900 gallons, which represents an average daily flow of 286,965 gallons per day.
One major plant upset did occur on October 1, 2010 when over ten inches of rainfall was received. The SBR’s were not able to handle the large increase in flows and began to overflow. The plant operator made the necessary corrective actions to stop the overflow and allow the flow to pass through the plant. PADEP was notified of the situation and the Sanitary Sewer Overflow report was prepared and submitted. Due to the process upset, final effluent weekly sampling was not completed for the period.
The influent area operated normally during the month. The muffin monster and influent screen were on line continuously. Debris generated by the unit was disposed of via trash bags. The three (3) raw lift pumps operated normally. No problems were noted with the pumps or associated controls. The soda ash feed system continued to experience problems during the month with clogging of the discharge line. The permanent new feed pump and discharge tubing were installed during the month. However, the new pump controls have not been corrected to date so the old feed pump remains in service.
The influent screen also developed operational problems during the month of October. The level control system failed and the unit had to be placed into continuous running mode. One of the level transducers is out of range and will require service repairs.
664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com
The SBR building operated normally during the month. SBR’s #1, #3, & #4 were in service with the mixed liquor being medium brown colored with an amount of tan surface foam heavy buildup. SBR #2 remained off line. The disc fillers were online continuously during the month but require almost daily resetting of alarm conditions, which continue to occur. The plant operator continues to make process control adjustments to improve the plant’s performance.
The ultraviolet light disinfection system also operated continuously throughout the month with both light banks being utilized. The system operated in the automatic mode for most of the month until a ballast failed on the #2 bank. The #1 bank was placed back in hand mode to ensure disinfection until the ballast can be changed.
The effluent system operated normally during the month. The house water system was in service continuously and no problems were experienced with the pumps or controls. The inline screens were cleaned on a regular basis to remove solids and debris buildup. The Applebrooke subdivision effluent pump was in service throughout the month of October. In October we sent approximately 51,996 gallons of effluent to the golf course daily for irrigation needs.
Construction work continued during the month on the Phase II part of the project. Work completed during the month included startup of the decant equalization system, sludge holding tanks, filler feed pumps and associated controls, development of a punch list, and control system adjustments.
Results of influent and final effluent samples collected during the month indicate compliance with the existing final effluent permit limitations.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator
C Mr. Dan Barbato, P.E. – Pennoni Associates
2
ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers
November 5, 2010
Mr. Mark MillerDirector of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Lockwood Chase Wastewater Treatment Facility
October 2010 Operations Report
Dear Mr. Miller:
The following is the October 2010 monthly operations report for East Goshen Township’s Lockwood Chase Wastewater Treatment Facility.
Treatment plant operations were normal during the month of October 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 294,000 gallons, which represents an average daily flow of 9,484 gallons per day.
The influent area operated normally during the month. The communitor unit was in-service continuously and no problems were noted with the unit or its controls. The plant operator was required to remove debris buildup from the unit’s housing, the bypass bar screen, and grit from the bottom of the influent chamber on a regular basis. Debris was disposed of via the trash can.
The aeration pond operated normally during the month of October. The pond’s color changed to brownish during the month and there was only minor surface scum buildup. Both floating aerators were in service continuously.
The polishing pond operated normally during the month as well. The pond’s color was very green due to algae growth with some moderate buildup of surface duckweed.
The chlorine feed system and chlorine contact tank were operational throughout the month to meet disinfection requirements. Liquid chlorine was added directly to the chlorine contact tank prior to starting the discharge pumps to help minimize odor issues.
664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com
The discharge spray system was operational during the month. The discharge pumps were operated in the hand position and alternated for each spray cycle. Spray fields No. 1 through No. 5 were utilized to help minimize odors.
Results of influent, final effluent, and monitoring well samples collected during the month were not available to date, but current permit compliance is expected.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator
C Mr. Dan Barbato, P.E. – Pennoni Associates
2
ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers
December 10, 2010
Mr. Mark MillerDirector of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Lockwood Chase Wastewater Treatment Facility
November 2010 Operations Report
Dear Mr. Miller:
The following is the November 2010 monthly operations report for East Goshen Township’s Lockwood Chase Wastewater Treatment Facility.
Treatment plant operations were normal during the month of November 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 652,600 gallons, which represents an average daily flow of 22,503 gallons per day.
The influent area operated normally during the month. The communitor unit was in-service continuously and no problems were noted with the unit or its controls. The plant operator was required to remove debris buildup from the unit’s housing, the bypass bar screen, and grit from the bottom of the influent chamber on a regular basis. Debris was disposed of via the trash can.
The aeration pond operated normally during the month of November. The pond’s color changed to brownish during the month and there was only minor surface scum buildup. Both floating aerators were in service continuously.
The polishing pond operated normally during the month as well. The pond’s color was very green due to algae growth with some moderate buildup of surface duckweed.
The chlorine feed system and chlorine contact tank were operational throughout the month to meet disinfection requirements. Liquid chlorine was added directly to the chlorine contact tank prior to starting the discharge pumps to help minimize odor issues.
664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com
The discharge spray system was operational during the month. The discharge pumps were operated in the hand position and alternated for each spray cycle. Spray fields No. 1 through No. 5 were utilized to help minimize odors.
Results of influent, final effluent, and monitoring well samples collected during the month were not available to date, but current permit compliance is expected.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator
C Mr. Dan Barbato, P.E. – Pennoni Associates
2
2008 FLOWMETERS
2010 NOVEMBER 4TH QUARTER
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY GPD | ELLIS LANE READING | ELLIS LANE GPD | PAOLI PIKE READING | PAOLI PIKE GPD | WILSON DRIVE READING | WILSON DRIVE GPD | SUMMIT GPD | NET FLOWS |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 11/01/10 | 1,844,530 | 1,349,500 | 16,101,620 | 140,253 | 8,770,520 | 61,643 | 10,331,894 | 90,500 | 20,400 | 1,057,105 |
| 0.00 | 11/02/10 | 20,400 | 0 | ||||||||
| 0.20 | 11/03/10 | 20,400 | 0 | ||||||||
| 1.20 | 11/04/10 | 1,847,853 | 1,107,667 | 16,134,626 | 110,020 | 8,784,942 | 48,073 | 10,356,048 | 80,513 | 20,400 | 869,060 |
| 0.00 | 11/05/10 | 1,849,347 | 1,494,000 | 16,152,598 | 179,720 | 8,791,794 | 68,520 | 10,365,741 | 96,930 | 20,400 | 1,148,830 |
| 0.00 | 11/06/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/07/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/08/10 | 1,852,866 | 1,173,000 | 16,189,862 | 124,213 | 8,806,275 | 48,270 | 10,383,984 | 60,810 | 20,400 | 939,707 |
| 0.00 | 11/09/10 | 1,853,980 | 1,114,000 | 16,201,188 | 113,260 | 8,811,056 | 47,810 | 10,391,650 | 76,660 | 20,400 | 876,270 |
| 0.00 | 11/10/10 | 1,855,083 | 1,103,000 | 16,211,996 | 108,080 | 8,815,688 | 46,320 | 10,398,221 | 65,710 | 20,400 | 880,890 |
| 0.00 | 11/11/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/12/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/13/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/14/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/15/10 | 1,860,497 | 1,082,800 | 16,266,453 | 108,914 | 8,837,724 | 43,672 | 10,426,368 | 56,294 | 20,400 | 873,920 |
| 0.00 | 11/16/10 | 1,861,596 | 1,099,000 | 16,277,309 | 108,560 | 8,842,703 | 49,790 | 10,435,200 | 88,320 | 20,400 | 852,330 |
| 0.00 | 11/17/10 | 1,862,755 | 1,159,000 | 16,288,980 | 116,710 | 8,848,037 | 53,340 | 10,446,887 | 116,870 | 20,400 | 872,080 |
| 0.00 | 11/18/10 | 1,863,848 | 1,093,000 | 16,300,399 | 114,190 | 8,853,578 | 55,410 | 10,456,265 | 93,780 | 20,400 | 829,620 |
| 0.00 | 11/19/10 | 1,864,959 | 1,111,000 | 16,311,414 | 110,150 | 8,858,422 | 48,440 | 10,464,502 | 82,370 | 20,400 | 870,040 |
| 0.13 | 11/20/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/21/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/22/10 | 1,867,889 | 976,667 | 16,343,668 | 107,513 | 8,870,613 | 40,637 | 10,482,022 | 58,400 | 20,400 | 770,117 |
| 0.00 | 11/23/10 | 1,869,231 | 1,342,000 | 16,354,031 | 103,630 | 8,875,059 | 44,460 | 10,491,302 | 92,800 | 20,400 | 1,101,110 |
| 0.00 | 11/24/10 | 1,870,370 | 1,139,000 | 16,365,178 | 111,470 | 8,880,175 | 51,160 | 10,500,697 | 93,950 | 20,400 | 882,420 |
| 0.00 | 11/25/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/26/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/27/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/28/10 | 20,400 | 0 | ||||||||
| 0.00 | 11/29/10 | 1,875,675 | 1,061,000 | 16,419,874 | 109,392 | 8,897,692 | 35,034 | 10,525,657 | 49,920 | 20,400 | 866,654 |
| 1.00 | 11/30/10 | 20,400 | 0 | ||||||||
| 20,400 | |||||||||||
| 2.53 | 1,070,342 | 108,388 | 45,529 | 74,222 | 842,203 |
DAILY LOC | INQUIRER | EG TWP
MONTH TO DATE
NORMAL MONTH TO DATE
YEAR TO DATE
NORMAL YEAR TO DATE
2007 flowmeters -all-stations separate month worksheets.xls
2008 FLOWMETERS
2010 NOVEMBER 4TH QUARTER
| DATE | HERSHEY'S MILL READING | HERSHEY'S MILL GPD | ASHBRIDGE READING | ASHBRIDGE GPD | HICKS METER READING | HICKS METER GPD | RESERVOIR READING | RESERVOIR GPD | SHERMAN READING | SHERMAN GPD | BARKWAY READING | BARKWAY GPD |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 11/01/10 | 19,776,976 | 67,568 | 949,718 | 80,500 | 14,526,644 | 360,283 | 107,836,339 | 848,898 | 446,773 | 7,395 | 1,707,017 | 14,320 |
| 11/02/10 | ||||||||||||
| 11/03/10 | ||||||||||||
| 11/04/10 | 19,792,540 | 51,880 | 951,595 | 62,567 | 14,620,043 | 311,330 | 108,049,712 | 711,243 | 448,741 | 6,560 | 1,710,286 | 10,897 |
| 11/05/10 | 19,798,457 | 59,170 | 952,616 | 102,100 | 14,659,420 | 393,770 | 108,143,118 | 934,060 | 449,324 | 5,830 | 1,711,483 | 11,970 |
| 11/06/10 | ||||||||||||
| 11/07/10 | ||||||||||||
| 11/08/10 | 19,815,899 | 58,140 | 954,844 | 74,267 | 14,742,150 | 275,767 | 108,358,805 | 718,957 | 451,276 | 6,507 | 1,715,093 | 12,033 |
| 11/09/10 | 19,821,341 | 54,420 | 955,971 | 112,700 | 14,774,494 | 323,440 | 108,432,002 | 731,970 | 451,889 | 6,130 | 1,716,203 | 11,100 |
| 11/10/10 | 19,826,558 | 52,170 | 957,131 | 116,000 | 14,804,653 | 301,590 | 108,502,405 | 704,030 | 452,573 | 6,840 | 1,717,220 | 10,170 |
| 11/11/10 | ||||||||||||
| 11/12/10 | ||||||||||||
| 11/13/10 | ||||||||||||
| 11/14/10 | ||||||||||||
| 11/15/10 | 19,853,490 | 53,864 | 959,333 | 44,040 | 14,939,616 | 269,926 | 108,839,316 | 673,822 | 455,675 | 6,204 | 1,723,059 | 11,678 |
| 11/16/10 | 19,858,864 | 53,740 | 959,962 | 62,900 | 14,971,949 | 323,330 | 108,912,110 | 727,940 | 456,339 | 6,640 | 1,724,150 | 10,910 |
| 11/17/10 | 19,864,281 | 54,170 | 960,619 | 65,700 | 15,007,915 | 359,660 | 108,989,217 | 771,070 | 456,910 | 5,710 | 1,725,229 | 10,790 |
| 11/18/10 | 19,869,830 | 55,490 | 961,253 | 63,400 | 15,041,246 | 333,310 | 109,062,592 | 733,750 | 457,556 | 6,460 | 1,726,339 | 11,100 |
| 11/19/10 | 19,875,174 | 53,440 | 961,871 | 61,800 | 15,072,239 | 309,930 | 109,133,580 | 709,880 | 458,127 | 5,710 | 1,727,417 | 10,780 |
| 11/20/10 | ||||||||||||
| 11/21/10 | ||||||||||||
| 11/22/10 | 19,891,964 | 55,967 | 963,951 | 69,333 | 15,148,633 | 254,647 | 109,295,580 | 540,000 | 460,023 | 6,320 | 1,731,166 | 12,497 |
| 11/23/10 | 19,897,031 | 50,670 | 964,405 | 45,400 | 15,179,831 | 311,980 | 109,405,850 | 1,102,700 | 460,639 | 6,160 | 1,732,200 | 10,340 |
| 11/24/10 | 19,902,585 | 55,540 | 965,103 | 69,800 | 15,213,392 | 335,610 | 109,479,905 | 740,550 | 461,469 | 8,300 | 1,733,305 | 11,050 |
| 11/25/10 | ||||||||||||
| 11/26/10 | ||||||||||||
| 11/27/10 | ||||||||||||
| 11/28/10 | ||||||||||||
| 11/29/10 | 19,932,901 | 60,632 | 968,336 | 64,660 | 15,341,086 | 255,388 | 109,820,830 | 681,850 | 465,118 | 7,298 | 1,740,418 | 14,226 |
| 11/30/10 | ||||||||||||
| 51,286 | 67,644 | 290,645 | 698,788 | 6,045 | 10,636 |
2007 flowmeters -all-stations separate month worksheets.xls
2010 SUMMARY OF METER READINGS
| MONTH | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,425,517 | 123,265 | 81,325 | 63,991 | 20,400 | 83,711 | 103,900 | 363,921 | 882,367 | 5,627 | 13,543 |
| FEBRUARY | 1,462,759 | 132,866 | 74,793 | 70,879 | 20,400 | 77,500 | 103,327 | 332,371 | 906,362 | 5,456 | 13,156 |
| MARCH | 1,603,009 | 170,328 | 75,607 | 63,240 | 20,400 | 102,840 | 146,865 | 404,526 | 1,071,132 | 5,071 | 19,213 |
| APRIL | 59,434 | 174,279 | 89,043 | 67,148 | 20,400 | 85,455 | 126,703 | 386,665 | 991,262 | 5,303 | 13,956 |
| MAY | 1,317,648 | 145,694 | 87,062 | 54,671 | 20,400 | 63,587 | 86,855 | 355,426 | 836,562 | 5,802 | 11,248 |
| JUNE | 1,225,309 | 126,607 | 78,857 | 70,230 | 20,400 | 57,796 | 67,285 | 353,596 | 802,473 | 5,804 | 11,194 |
| JULY | 1,106,553 | 128,794 | 61,615 | 108,460 | 20,400 | 51,263 | 61,149 | 332,264 | 727,562 | 4,751 | 10,465 |
| AUGUST | 1,053,504 | 149,151 | 61,447 | 107,885 | 20,400 | 47,989 | 59,434 | 324,438 | 683,558 | 5,412 | 8,486 |
| SEPTEMBER | 1,032,377 | 125,642 | 56,133 | 94,124 | 20,400 | 45,339 | 59,940 | 357,186 | 650,049 | 5,465 | 10,401 |
| OCTOBER | 1,241,095 | 136,285 | 49,227 | 79,650 | 20,400 | 33,650 | 81,895 | 328,383 | 781,909 | 6,397 | 11,637 |
| NOVEMBER | 1,070,342 | 108,388 | 45,529 | 74,222 | 20,400 | 51,286 | 67,644 | 290,645 | 698,788 | 6,045 | 10,636 |
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,145,232 | 138,300 | 69,149 | 77,682 | 20,400 | 63,674 | 87,727 | 348,129 | 821,093 | 5,558 | 12,176 |
To
West Goshen 860,101
2010 flowmeters -all-stations separate month worksheets.xlsSUMMARY
November Precip. 1.87 - 2010
Precip.: 0, 0.2, 0.4, 0.6, 0.8, 1, 1.2, 1.4, 1.6, 1.8, 2
snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
November
October Precip. 15.16 - 2010
Precip.: 0, 2, 4, 6, 8, 10, 12, 14, 16
snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
October
Monthly Totals 2010 (Jan-Dec)
Precip.: 0, 2, 4, 6, 8, 10, 12, 14, 16
Month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
Monthly Totals
November Precip. 2.53 - 2010
Precip.: 0, 0.5, 1, 1.5, 2, 2.5, 3
Snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34
November
Monthly Totals 2010 (Jan-Dec)
Precip.: 0, 2, 4, 6, 8, 10, 12, 14, 16
Month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
Monthly Totals
Flowmeters Nov. 2010
Flow#s: 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000
Day of the month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
November
Monthly Totals 2010 Jan-Dec
Flowmeters: 0, 500000, 1000000, 1500000, 2000000, 2500000
Month: January, February, March, April, May, June, July, August, September, October, November, December
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
November 23, 2010
Dear Property Owner:
The purpose of this letter is to inform you that Liberty Towers, LLC has applied for a Zoning Variance requesting relief from the zoning ordinance. The applicant is requesting that the Zoning Hearing Board grant relief to allow a Wireless Communications Facility use in the C-2 Zoning District, and for dimensional relief from the rear yard setback requirements. If granted the relief the applicant proposes to construct a 150 foot tall Wireless Communications tower behind the Wawa store at 1594 Paoli Pike.
The applicant requests relief from the following sections of the Township Zoning Ordinance: §240-15.B and §240-15.G.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.
This application is scheduled to be discussed during the meetings outlined below, and is subject to change. Visit the Township website for current information:
December 1, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
December 14, 2010 - Board of Supervisors meeting (at 7:00 pm)
Date To Be Determined - Zoning Hearing (Please check the Township website for the Hearing Date and time)
All meetings are held at the Township Building, are open to the public and are subject to change. This variance application is available for review at the Township Building during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[signature]
Mark A. Gordon
Township Zoning Officer
Cc: All Township Boards and Commissions
Jeff Sommer, Esq. Township Solicitor (Via Email)
Mark Thompson, Esq. Zoning Hearing Board Solicitor (Via Email)
Richard J. Lemanowicz, Esq. (Via Email)
F:\Data\Shared Data\Property Management\53-4\53-4-80.01 (1594 Paoli Pike)\Liberty Towers Nov 2010 CU App\1000 foot ltr ZV 11232010.doc
PMAA
Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401 Wormleysburg, PA 17043
717-737-7655 ▪ 717-737-8431(Fax)
www.municipalauthorities.org ▪ info@municipalauthorities.org
TO: Association Members
FROM: Mark Nicely, Conference Chair
Douglas E. Bilheimer, Executive Director
DATE: December 2, 2010
SUBJECT: 2011 PMAA Annual Conference
Call for Papers/Session Topics
As PMAA begins planning for the 2011 Annual Conference, we are asking you, the members, for your suggestions and possibly expertise in presenting your information to the conference delegates.
As authorities, you may have recently completed a project or administrative program that has made your authority more efficient or operationally advanced. As PMAA members, sharing your experiences is part of the benefits of Association participation. If you are an authority simply looking for guidance in a certain area of operations or management, please use this opportunity to express your interest in a topic.
Associate members, PMAA has relied on your expertise in educating our membership at countless seminars and conferences. PMAA prides itself in providing the premier industry forum for networking and information exchange. If you or your firm has a particular area of expertise, an interesting case study or a suggestion for conference educational session, please share your idea with the Conference Committee using the form below.
Please complete the form below with your suggestions or proposals. The Conference Committee will be provided with a complete listing of your educational session ideas.
Submitted ideas not chosen for the 2011 Conference may be utilized at other PMAA educational sessions.
Forms must be completed and returned no later than Friday, January 14, 2011. This form can be faxed to the PMAA office at 717-737-8431 or e-mailed to lehman@municipalauthorities.org
Contact Person: __________________________________ E-mail: __________________________________
Authority/Firm: ____________________________________________________________________________
Phone No.: __________________________________ Fax No.: __________________________________
Topic: ____________________________________________________________________________________
Have you previously presented this topic? □ Yes □ No
If yes, could you provide a reference from that presentation? ______________________________________
Topic Summary (2 or 3 sentence overview, use back of paper or an additional sheet if more room is needed):
□ Yes, our Authority/Firm would be willing to present a session or portion of a session relating to the above-mentioned topic.
□ We would suggest the Association provide an educational session on the above-mentioned topic.
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 1, 2010
Mr. Joseph M. McCawley
1621 Eldridge Drive
West Chester, PA 19380
RE: Municipal Authority Reappointment
Dear Joe:
I am pleased to inform you that at their meeting on Tuesday, November 23, 2010, the Board of Supervisors reappointed you to a five-year term on the East Goshen Township Municipal Authority Board.
On behalf of the Board and the residents of East Goshen Township, I would like to take this opportunity to thank you for your dedicated service. We look forward to working with you in the future.
As always, if we can be of any assistance, please feel free to call.
Sincerely yours,
[signature]
Rick Smith / m
Louis F. Smith, Jr.
Township Manager
Nns
Cc: Municipal Authority
F:\Data\Shared Data\ABC'S\Municipal Authority\appointments\mccawley\mccawley120110.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 1, 2010
Kevin Cummings
1606 Williams Way
West Chester, PA 19380
RE: Municipal Authority Appointment
Dear Kevin:
I am pleased to inform you that at their meeting on Tuesday, November 23, 2010 the Board of Supervisors appointed you to the East Goshen Township Municipal Authority.
The Municipal Authority holds their formal meeting the second Monday of each month at 7:00 PM and may schedule workshops as needed. A meeting agenda and applicable information will be delivered to your home the weekend prior to each meeting.
As always, if we can be of any assistance, please feel free to call.
Sincerely yours,
[signature]
Rick Smith / m
Louis F. Smith, Jr.
Township Manager
nns
cc: Municipal Authority
F:a\Shared Data\ABC'S\municipal authority\appointments\cummings 120110.doc
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: August 12, 2010
To: Planning Commission
Municipal Authority
Park & Rec Board
Conservancy Board
Historical Commission
From: Rick Smith, Township Manager
Re: Comprehensive Plan Goals
Background - The Comprehensive Plan (Plan) that the Board of Supervisors adopted on June 21, 2005 identifies a series of action items that need to be completed in order to accomplish the goals set forth in the Plan. These action items are set forth in Chapter 10 of the Plan.
Chapter 10 lists the timeframe for completion, the priority, the method of implementation and the party responsible for each action item. A recent review indicates that while we as a Township have made significant strides in completing the action items the work is not yet complete.
Enclosed is a list of the applicable action items for each ABC. This list only includes a summary of each action and additional information is available in the Plan. The complete Plan is available on the Township web page, if you would like a hard copy of the plan just let me know.
Required Action - The Board would like each ABC to review their list of action items to see which items can be competed by year-end. The ABC would report on these at the Annual Planning Session. In addition, each ABC should use their list of action items as a basis for determining their goals for 2011.
Enclosures
Cc: Board of Supervisors
Staff Liaisons
F:\Data\Shared Data\ABC'S\Goals\COMP PLAN GOALS\Memo to ABCs 081210.doc
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice 610-692-7171
Fax 610-692-8950
E-mail rsmith@eastgoshen.org
Date: December 5, 2010
To: Board of Supervisors
Conservancy Board
Historic Commission
Municipal Authority
Planning Commission
Park and Recreation Board
Deer Management Committee
From: Rick Smith, Township Manager
Re: 2011 Planning Session, Saturday, January 8, 2011
The Annual Planning Session Meeting will be held on Saturday, January 8, 2011 at 8:05 am and the agenda will be as follows:
At the Planning Session a representative from each ABC is expected to outline their respective ABC's Goals accomplishments for 2010 as well as their goals for 2011. As I noted in my August 12, 2010 memo (attached) the Board of Supervisors would like each ABC to use the action items from the Comprehensive Plan as a basis for their goals.
8:05 am Conservancy Board
8:25 am Historic Commission
8:45 am Municipal Authority
9:05 am Park and Recreation Board
9:25 am Planning Commission
9:45 am Deer Management Committee
10:05 am Board of Supervisors Recap
PS to Jim McRee: Since the Deer Management Committee does not have action items in the Comp Plan a recap of the 2009/2010 program and YTD info on the 2010/2011 program would suffice.
F:\Data\Shared Data\Agendas\Board of Supervisors\2011\2011 Planning Session.doc