Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

December 13, 2010
Monday, 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. RIDLEY CREEK REPORTS Brickhouse Environmental Project Manager Report; Pennoni Engineers Report; Cost Summary Report; Change Orders – Worth & Co. – additional gate; Other
  3. RIDLEY CREEK INVOICES a. Fastenal, #PAMAV4919, 11/18/10 $ 2,474.04 b. Highway Materials, #1622530MB, 11/5/10 $ 1,828.36 c. Highway Materials, #11025998MB, 11/05/10 $ 1,841.53 d. Highway Materials, #11026142MB, 10/18/10 $ 260.42 e. Highway Materials, #11026121MB, 11/17/10 $ 1,147.06 f. Worth and Company Inc., #P28001, 11/30/10 $125,000.00 g. Brickhouse Environmental, #5683, 12/01/10 $ 9,947.50 h. Pennoni, #457258, 11/23/10 $ 4,097.75 i. Gawthrop,Greenwood, PC, #84386, 11/30/10 $ 171.00 j. Gawthrop Greenwood, PC #84387, 11/30/10 $ 720.00 k. Gawthrop Greenwood, PC #84078, 10/31/10 $ 720.00 l. Independence Const., #30-00010257, 11/05/10 $ 3,136.40 m. Independence Const., #30-00010259, 11/05/10 $ 4,202.99 n. Power Pro Equip., #P32515, 10/27/10 $ 17.50 o. Ransome Rental, #K0308701, 10/25/10 $ 1,984.00 p. Martin Limestone, #302737, 10/18/10 $ 296.35 q. Martin Limestone, #302735, 11/1/10 $ 299.83 r. Martin Limestone, #303385, 10/25/10 $ 593.57 s. Silvi Concrete, #2122141, 10/21/10 (already approved in Oct. need to be paid) $ 1,552.80 t. Reilly & Sons Inc., #000531, 11/02/10 $ 1,125.21
  4. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  5. APPROVAL OF MINUTES November 8, 2010
  6. APPROVAL OF INVOICES a. Gawthrop Greenwood, 84385 $ 380.00 b. Pennoni, #457260, 11/23/10 $ 1,785.00 c. Pennoni, #457259, 11/23/10 $ 105.00
  7. LIAISON REPORTS
  8. FINANCIAL REPORTS November Report

Monday, December 13, 2010

- 1 -

  1. Approval of the Final 2011 Budget
  2. GOALS November Report
  3. OLD BUSINESS
  4. NEW BUSINESS West Pikeland Twp. Sewer Capacity Request; Fee Schedule for Year 2011 and Annual Services
  5. CAPACITY REQUESTS None
  6. SEWER REPORTS Director of Public Works Report – November 2010; East Goshen Township Flows for 2010; Artesian Lockwood Chase Reports - 2010; Artesian Ridley Creek Report –2010
  7. ANY OTHER MATTER
  8. CORRESPONDENCE AND REPORTS OF INTEREST
  9. PUBLIC COMMENT
  10. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Delivery date
November 10, 2010 January 1, 2011
February 20, 2011
May 12, 2011
August 11, 2011
November 10, 2011

Monday, December 13, 2010

- 2 -

Brickhouse Environmental

Project Accomplishments

B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
November 2010

The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:

  • 11-1-10 Emails re: Electrical punch list and Division 16 requirement of electrical coordination study. Also w/ Worth's Jeff Bush re: pending change order requests.
  • 11-2-10 Late afternoon site visit to review plant operation and conditions.
  • 11-3-10 Meeting w/ M. Miller at site to review operations and controls. Review documents in preparation for next morning's meetings.
  • 11-4-10 Special meeting at Township Building to discuss pending legal issues.
  • 11-4-10 Biweekly progress meeting.
  • 11-5-10 Finalize October's Project Manager's report and distribute via email. Compile and review laboratory testing fees fro SBR performance / warranty test period.
  • 11-8-10 On site all morning from 6 am troubleshooting suspected power failure occurrences. Main breaker to WWTP tripped and blower #4 VFD had failed and required replacing. Both Worth & Clinger employees on site.
  • 11-8-10 Attended and presented at Authority Monthly Meeting.
  • 11-9-10 Site visit observation Worth trailer had been removed. Basin #1 planting completed. Walk concreted from control Bldg. to Davco stairs. Pennoni checking electrical punch list progress. Treatment building floor penetrations being sealed. Area N / NW of Screen Building & EQ graded and straw down. Met w/ Pennoni's M. McAloon & S. Seacrist re: power failure issue.
  • 11-10-10 Site visit to follow up corrective actions implemented 11-8-10. Review and prepared response to questions raised at 11-8-10 Authority Meeting.
  • 11-11-10 Site visit to gather auto dialer alarm info for the new system and forward info to M. Miller. Reviewed lab results and investigated additional lab fees invoiced by O & M contractor.
  • 11-12-10 correspondence and coordination w/ Lancaster Lab reps in preparation of the SBR performance warranty testing.

Brickhouse Environmental

  • 11-15-10 Site visit to review SBR operations and outline process testing protocols.
  • 11-16-10 Site visit to review SBR operations, gather and review process control data. Met w/ Worth's Dwayne and Pennoni's M. McAloon for an update on Mechanical contractor's punch list.
  • 11-16-10 Attended Operations and Maintenance bid opening.
  • 11-17-10 Site visit to meet reps from Lancaster Lab in prep for SBR performance testing. Reviewed sample locations, procedures and sample pick up times. Towler & Evans met w/ Tom Horrex and Tim Daily to review the present operating conditions of the facility and equipment with respect to the intended design.
  • 11-18-10 Reviewed Bob Dina's (Clinger) response regarding the electrical coordination study required as part of the contract. Forwarded comments to R. Smith and copied Pennoni and Dave Evans.
  • 11-19-10 Site meeting w/ M. Miller to coordinate placing SBR # 2 into service. SBR # 2 WAS pump check valve was adjusted to allow flow to the SBR for ease of seeding the tank prior to its service.
  • 11-23-10 Arrived as requested on site at 5:30 am. Reviewed SBR process control data, PLC set points for the 4 SBR systems and reviewed overall treatment process performance. Tel. con. w/ J. Bush requesting additional explanation and detailing regarding the Authority's decision to disapprove time extensions as a result of the PECO power and Siemens material change alleged delays. Email to Paul Christiansen (Siemens Jet Tech) for guidance for set points and process adjustments.
  • 11-29-10 Site visit to update SBR set points. Reviewed operational data from 11-23 thru 11-29.
  • 11-30-10 Site visit to review SBR performance and changes with respect to SBR set point changes. Gather and review plant performance data. Updated CO 5, reviewed and distributed the revised PCO 14. Forwarded plant data and questions to P. Christiansen (Siemens) regarding SBR performance and pending adjustments.

Notes:

  1. Brickhouse's project management involvement was originally anticipated to be completed week 67, ending August 8, 2010 at 1,522 hours.
  2. Brickhouse's involvement was extended, without need to increase the total contract hours or value to due to Brickhouse being under the original budget. This extension was to week 76, ending October 10, 2010 and

Brickhouse Environmental

attendance at the October 11, 2010 Monthly Authority Meeting. At that time the original budget hours were met.

  1. Brickhouse's involvement was subsequently extended on a T & M basis until released by the Authority from any further needs.

J:\092532.0\November 2010 Bullets.doc

EGMA 1000

Pennoni

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Daniel Barbato, P.E.
Authority Engineer
DATE: December 9, 2010
SUBJECT: Engineer's Report

RCSTP Upgrade and Expansion

  • Construction phase services have transitioned to punchlist monitoring, final review of operations and maintenance submittals, startup assistance and troubleshooting, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Brickhouse and the Township, and approval of contractor Payment Requests.
  • A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
  • Worth and Company and Clinger Corporation are working on punchlist completion and outstanding items are expected to be complete this month.
  • Pennoni has completed review of all Operations and Maintenance submittals for Worth and Clinger and has provided comments back to both contractors.
  • Pennoni will support plant performance testing activities as needed.
  • Pennoni Design Engineer Tim Daily visited the plant to review the installation and operation compared to the intent of his design. A report was submitted to the Authority with details and recommendations.

I/I Metering Project

  • The Township continues to meter flows at selected locations. Meters are in the process of being located to the proposed new locations, and we will review all meter data as it is submitted.

Ridley Creek Consent Order

  • The next report is due to DEP in March of 2011. No comments were received to date on the September report submitted to DEP.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\Memo to EGMA Board 2010-12-09.docx

EGMA 1000

LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning

  • These documents were provided to the Township for submittal to DEP. The Township received comments from DEP and we are in the process of addressing. We have requested an extension from DEP to complete the response to their comments by the end of February. Several of the DEP comments require that West Goshen adopt resolutions. The extension will allow for time to prepare and submit the resolutions for adoption.

Marydell PS Elimination Planning

  • The draft report sections for the Act 537 Plan Revision are being assembled. We anticipate completing the reports in late December or early January. Several notification forms are being completed at this time.

Applebrook Comprehensive Groundwater Evaluation

  • Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The report is drafted and will be ready for Township review before the Holiday. No significant issues were identified as a result of the evaluation

West Pikeland Township Sewer Capacity Request

  • On August 5, 2010, West Pikeland Township requested East Goshen to consider accepting 20,000 gallons per day of sewage from West Whiteland to facilitate West Pikeland's capacity needs. Our recommendation in response to the request is provided under separate cover.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\Memo to EGMA Board 2010-12-09.docx

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT SUMMARY

December 13, 2010
Includes bills paid at 11/8 meetings

Name Budget or Contract amt. This Month To Date Balance on Budget or Contract % of work completed
RECEIPTS
Bond $9,500,000.00 $0.00 $9,500,000.00
Pennoni (rechargable) $20,000.00 $0.00 $20,000.00
Grant $464,195.00 $0.00 $464,195.00
RECEIPTS TOTAL $9,984,195.00 $0.00 $9,984,195.00
EXPENSES
Borrowing costs $52,250.00 $0.00 $52,250.00 $0.00 100.00%
Worth $7,865,400.00 $278,520.50 $7,645,366.12 $220,033.88 97.20%
    change orders $17,523.22 $0.00 $0.00 $17,523.22 0.00%
Clinger $974,000.00 $30,597.44 $950,777.64 $23,222.36 97.62%
    change orders $33,312.24 $0.00 $0.00 $33,312.24 0.00%
Pennoni (Inspection) (05) $136,200.00 $0.00 $136,197.62 $2.38 100.00%
Pennoni (Continued Services) (10) $177,900.00 $12,393.25 $158,702.61 $19,197.39 89.21%
Pennoni (Rechargeable) (06) $20,000.00 $0.00 $12,961.75 $7,038.25 64.81%
Brickhouse $175,000.00 $26,823.75 $181,626.25 -$6,626.25 103.79%
Extras
Capital $440,413.54 $18,217.71 $124,463.27 $315,950.27 28.26%
Capital (Identified but not paid) $80,196.00 $0.00 $0.00 $80,196.00 0.00%
Trailer, Phone, Porta Pot & Internet $12,000.00 $305.00 $11,825.18 $174.82 98.54%
EXPENSES TOTAL $9,984,195.00 $366,857.65 $9,274,170.44 $710,024.56 92.89%

We have identified $41,357 in potential extras.

Retainage (10% until 50% of the project is done then it drops back to 5%)

Worth $224,058.22 2.5%
Clinger $51,794.25 5%
Total $275,852.47

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 121310.xls SUMMARY V2

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL

December 13, 2010

Vendor / Category Date Amount Subtotals Name Description
Worth
2/9/2009 $561,150.00 Worth & Company Application #1
3/9/2009 $480,825.00 Worth & Company Application #2
4/9/2009 $768,780.00 Worth & Company Application #3
5/8/2009 $125,352.90 Worth & Company Application #4
5/31/2009 $485,103.12 Worth & Company Application #5
6/30/2009 $267,975.00 Worth & Company Application #6
7/31/2009 $138,217.50 Worth & Company Application #7
8/31/2009 $679,793.40 Worth & Company Application #8
9/30/2009 $504,310.98 Worth & Company Application #9
9/30/2009 $222,861.55 Worth & Company Application #10 (5% retainage)
10/31/2009 $724,089.05 Worth & Company Application #11
11/30/2009 $379,360.17 Worth & Company Application # 12
12/31/2009 $374,772.62 Worth & Company Application #13
1/31/2010 $207,881.86 Worth & Company Application # 14
2/28/2010 $69,077.35 Worth & Company Application # 15
3/31/2010 $75,857.50 Worth & Company Application # 16
4/30/2010 $170,263.75 Worth & Company Application # 17
5/31/2010 $178,290.62 Worth & Company Application #18
6/30/2010 $299,633.25 Worth & Company Application #19
7/30/2010 $426,170.00 Worth & Company Application #20
8/31/2010 $227,050.00 Worth & Company Application #21
9/30/2010 $54,520.50 Worth & Company Application 22
10/31/2010 $224,000.00 Worth & Company Application #23
$7,645,336.12 $7,645,336.12
Clinger
4/9/2009 $22,152.64 Clinger Application #1
5/8/2009 $15,714.77 Clinger Application #2
5/31/2009 $77,973.43 Clinger Application #3
6/30/2009 $12,567.46 Clinger Application #4
8/30/2009 $10,855.98 Clinger Application #5
9/30/2009 $111,255.75 Clinger Application #6
10/31/2009 $59,344.83 Clinger Application #7
11/30/2009 $145,354.05 Clinger Application # 8
12/31/2009 $94,727.00 Clinger Application # 9
1/31/2010 $139,092.94 Clinger Application #10
2/28/2010 $58,514.64 Clinger Application #11
2/28/2010 $41,530.78 Clinger Application #12 (5% retainage)
$13,575.79 Clinger Application #13
5/2/2010 $34,539.38 Clinger Application # 14

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls | DETAIL

Date Amount Subtotals Name Description
6/30/2010 $40,633.52 Clinger Application #15
8/1/2010 $42,347.24 Clinger Application # 16

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL

DETAIL

Date Amount Subtotals Name Description
8/31/2010 $30,597.44 Clinger Application #17
$950,777.64 $950,777.64
Pennoni
? $712.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU ?
10/30/2008 $943.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 10/19/08
12/5/2008 $18,115.98 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 11/30/08
1/15/2009 $12,929.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 12/28/08
2/5/2009 $13,352.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009 $31,288.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009 $29,010.46 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009 $22,436.46 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 4/26/09
7/29/2009 $3,528.00 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 7/19/09
12/30/2010 $16,482.50 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 12/31/10
1/29/2010 $24,224.58 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 1/17/10
2/23/2010 $13,057.00 PENNONI ASSOCIATES INC. RCSTP EXP PROJ SERV THRU 2/14/10
4/1/2010 $19,243.40 PENNONI ASSOCIATES INC.
5/5/2010 $18,810.50 PENNONI ASSOCIATES INC. Through 4/18/2010
5/25/2010 $19,287.50 PENNONI ASSOCIATES INC. Through 5/16/2010
6/29/2010 $17,901.25 PENNONI ASSOCIATES INC. Through 6/20/10
7/29/2010 $17,302.63 PENNONI ASSOCIATES INC. Through 7/18/2010
8/26/2010 $12,393.25 PENNONI ASSOCIATES INC. Through 8/15/2010
9/29/2001 $12,521.81 PENNONI ASSOCIATES INC. through 9/19/2010
10/27/2010 $12,326.15 PENNONI ASSOCIATES INC. Through 10/17/2010
$315,866.97 $315,866.97
Pennoni (rechargeable)
2/5/2009 $2,840.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009 $4,934.75 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009 $3,777.00 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009 $1,409.50 PENNONI ASSOCIATES INC. RCSTP EXP.PROJ. SERV. THRU 4/26/09
$12,961.75 $12,961.75
Brickhouse
5/12/2009 $2,127.50 BRICKHOUSE Apr-09
6/1/2009 $8,452.50 BRICKHOUSE May-09
7/1/2009 $7,791.25 BRICKHOUSE Jun-09
8/3/2009 $9,315.00 BRICKHOUSE Jul-09
9/1/2009 $7,762.50 BRICKHOUSE Aug-09
10/1/2009 $7,417.50 BRICKHOUSE Sep-09
11/2/2009 $7,072.50 BRICKHOUSE Oct-09
12/1/2009 $7,963.75 BRICKHOUSE Nov-09
1/4/2010 $7,762.50 BRICKHOUSE Dec-09
2/1/2010 $7,618.75 BRICKHOUSE Jan-10
3/1/2010 $7,417.50 BRICKHOUSE Feb-10
4/1/2010 $10,005.00 BRICKHOUSE Mar-10
5/3/2010 $11,931.25 BRICKHOUSE Apr-10

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls

16 TREES
Date Amount Subtotals Name Description
6/1/2010 $10,321.25 BRICKHOUSE May-10
7/1/2010 $11,845.00 BRICKHOUSE Jun-10
8/2/2010 $14,911.25 BRICKHOUSE Jul-10
9/1/2010 $14,087.50 BRICKHOUSE Aug-10
10/1/2010 $10,695.00 BRICKHOUSE Sep-10
10/1/2010 $6,785.00 BRICKHOUSE Clinger Matter
11/1/2010 $8,826.25 BRICKHOUSE Oct-10
11/1/2010 $571.50 BRICKHOUSE Clinger Matter
$180,680.25 $180,680.25
Extras - Capital - Paid
12/22/2008 $44.98 EAST GOSHEN TOWNSHIP REIMBURSE GEN.FUND FOR OFFICE DEPOT
12/31/2008 $88.00 FASTSIGNS RED ON WHITE ALUM. SIGNS
1/12/2009 $177.00 FASTSIGNS SIGNS - PLEASE AVOID TOWNE DR....
12/1/2008 $36.00 GREAT VALLEY LOCKSHOP KEYS FOR CONTRACTOR
12/8/2008 $160.80 GREAT VALLEY LOCKSHOP PADLOCKS, REKEY CYLINDERS & KEYS
12/29/2008 $474.82 HANSON AGGREGATES INC 36.95 TONS SUBBASE AGGREGATE
12/31/2008 $908.00 HANSON AGGREGATES INC 70.66 TONS SUBGRADE 2 AGGREGATE
12/15/2008 $2,089.39 LENNI ELECTRIC CORPORAT TEMP SERV. FOR TRAILER - RIDLEY CRK
12/31/2008 $120.00 LENNI ELECTRIC CORPORAT SEWER PLANT - GUY WIRE RELOCATE
12/29/2008 $7,865.00 MACANGA INC. TRUCK & TRACKHOE RENTAL 12/5-12/18
12/1/2008 $2,466.00 PATTERSON, MICHAEL J. MATERIALS & LABOR - SPLIT RAIL FENCE
12/1/2008 $4,907.72 PIPE XPRESS INC. COPPER TUBING, BRASS COMP. COUPLING
12/15/2008 $813.74 PIPE XPRESS INC. BURIAL HYDRANT, BRASS CURB STOP, &
12/29/2008 $129.00 RAM-T CORPORATION 2 FT. SILT FENCE
12/1/2008 $1,183.00 RANSOME RENTAL COMPAN CATERPILLAR - TRUCK LOADER RENTAL
12/8/2008 $3,960.00 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 11/13-11/25/08
12/29/2008 $908.00 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 12/15 - 12/18/08
12/31/2008 $1,044.85 RANSOME RENTAL COMPAN CATERPILLAR RENTAL 12/15-12/16/08
12/8/2008 $119.95 SAFETY SOLUTIONS INC. MEDICAL SUPPLIES
12/1/2008 $635.60 US MUNICIPAL SUPPLY INC. CUSTOM SIGNS - RIDLEY CREEK TREATMT
12/31/2008 $157.50 GAWTHROP GREENWOOD LEGAL
1/31/2009 $936.50 GAWTHROP GREENWOOD LEGAL
3/19/2009 $1,246.64 HAMMOND & MCCMLOSY WATER SERVICE
3/31/2009 $1,254.00 GAWTHROP GREENWOOD LEGAL
4/2/2009 $274.21 PIPE XPRESS INC. YARD HYDRANT #2
4/2/2009 $1,910.28 HAMMOND & MCCMLOSY WATER PIPING
5/11/2009 $158.69 US MUNICIPAL SUPPLY INC. 3 SIGNS
4/30/2009 $264.86 LENNI ELECTRIC CORPORAT WIRED HOT WATER HEATER
5/31/2009 $133.00 GAWTHROP GREENWOOD LEGAL
6/30/2009 $304.00 GAWTHROP GREENWOOD LEGAL
7/17/2009 $1,481.00 EAST GOSHEN TOWNSHIP BLOWER MOTOR (REPAIRED AND KEPT AS A SPARE)
9/10/2009 $254.85 AGWAY TREE STAKES AND PEAT MOSS
8/25/2009 $1,855.00 HARMONY HILL NURSERIES
8/31/2009 $836.00 GAWTHROP GREENWOOD 2 MONTH LEGAL
11/19/2009 $314.00 VIMCO SEALER FOR FLOORS

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL

DETAIL

Date Amount Subtotals Name Description
10/31/2009 $285.00 GAWTHROP GREENWOOD LEGAL
12/31/2010 $1,414.97 L/B water YARD HYDRANT #2
12/18/2009 $443.48 Grainger Hose Reel 1 inch
12/18/2009 $267.98 Grainger Hose Reel 3/4 inch
2/2/2010 $789.45 Fisher Scientific Lab Equipment
2/28/2010 $57.00 GAWTHROP GREENWOOD LEGAL
3/15/2010 $103.96 Matthews Ford Van rental
3/31/2010 $275.50 Grainger Hose
3/31/2010 $247.00 GAWTHROP GREENWOOD LEGAL
4/7/2010 $70.15 GREAT VALLEY LOCKSHOP 6 locks
4/14/2010 $641.98 Grainger Shelving
4/15/2010 $1,127.48 Continetal Fire & Safety 3" & 1.75" Hose
4/16/2010 $28.58 Grainger Phone
3/17/2010 $1,092.01 Water Pollution Biology Michael Geradi - Talk
2/22/2010 $1,104.50 McNichols Safety Grating
5/5/2010 $1,078.38 HAMMOND & MCCMLOSY WATER LINE OFFICE
5/5/2010 $270.10 HAMMOND & MCCMLOSY Hose fitting in storage room
5/3/2010 $2,329.17 Fisher Scientific DESICCATOR & OVEN
5/12/2010 $1,485.63 Fisher Scientific FURNACE
5/21/2010 $456.81 USA Blue book beakers
4/29/2010 $258.00 Marco 3 10Lb dry Chem FX
5/9/2010 $142.47 Staples office equipment
5/31/2010 $1,862.00 GAWTHROP GREENWOOD Legal
5/15/2010 $39,937.70 Aqua Wastwater Mgt Sludge from DAVCO
6/30/2010 $126.63 PIPE XPRESS INC. pipe
6/15/2010 $204.40 GREAT VALLEY LOCKSHOP locks
6/8/2010 $150.00 O'Rourke and Sons Bend counter tops
6/29/2010 $615.00 PENNONI Soda Ash
7/20/2010 $99.99 Office Depot Printer
7/16/2010 $50.39 Office Depot Printer cartridge
7/27/2010 $649.00 Newtown Office Supply Desk
7/31/2010 $589.00 GAWTHROP GREENWOOD Legal
6/29/2010 $193.93 Fastenal Chain
6/29/2010 $1,019.00 LENNI ELECTRIC CORPORAT Lights
7/12/2010 $328.70 HAMMOND & MCCMLOSY sink
7/15/2010 $154.23 Hach cable
7/16/2010 $347.26 Hach Combo
8/8/2010 $1,599.97 Northern Air Compressor
8/31/2010 $1,310.00 GAWTHROP GREENWOOD LEGAL
8/3/2010 $43.27 Office Depot White board
8/3/2010 $37.08 Office Depot White board
8/31/2010 $2,623.51 PIPE XPRESS INC. pipe
9/1/2010 $465.02 PIPE XPRESS INC. pipe
8/25/2010 $357.50 Main Line Concrete Concrete
9/30/2010 $1,242.50 GAWTHROP GREENWOOD LEGAL
10/7/2010 $665.00 O'Rourke and Sons AC stand

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls

Date Amount Subtotals Name Description
10/18/2010 $2,531.00 Blosenski Dumpster
10/13/2010 ($105.00) Power Pro pallet credit
10/5/2010 $2,073.90 Power Pro block and pallet charge
10/27/2010 $17.50 Power Pro Re-bar
10/18/2010 $577.93 Martin Limestone Stone
10/18/2010 $296.35 Martin Limestone Stone
10/18/2010 $299.83 Martin Limestone Stone
10/20/2010 $270.75 VIMCO concrete products
10/20/2010 $608.00 RANSOME RENTAL COMPAN Cat rental
10/25/2010 $1,984.00 RANSOME RENTAL COMPAN Rental
10/5/2010 $571.88 Yerkes PL Survey
10/23/2010 $212.40 Grainger Door Parts
9/20/2010 $88.32 Yale Electric Parts
9/21/2010 $114.76 Yale Electric Parts
9/17/2010 $450.00 Steven Bahnatka Wall Sign
9/7/2010 $4,190.00 M&S Service Alarm system
9/10/2010 $851.22 HAMMOND & MCCMLOSY HW heater
8/25/2010 $337.50 Main Line Concrete side walks
9/1/2010 $465.02 PIPE XPRESS INC. Roof Drains
9/7/2010 $86.25 PIPE XPRESS INC. Water supply
9/14/2010 $368.60 EAST GOSHEN TOWNSHIP Reimburse GF for Gutter Parts
Total $110,684.06 $110,684.06
Extras - Capital - Identified capital extras that have not been paid
$20,396.00 Driveway Restoration
$3,300.00 Restoration of parking area
$50,000.00 Paving at RCSTP (we received a credit from Worth)
$6,500.00 Audit
Total $80,196.00 $80,196.00

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL

DETAIL

Date Amount Subtotals Name Description
Trailer, Phone, Porta Potty & Internet
12/15/2008 $1,039.10 ACTON MOBILE INDUSTRIES RENTAL MOBILE OFFICE
12/22/2008 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - THRU 1/19/09
1/21/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 1/20-2/20/09
2/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 2/20- 3/20/09
3/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 3/20 - 4/19
4/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFICE RENTAL - 4/20 - 5/19
5/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFCIE RENTAL 5-20 - 6/19
6/10/2009 $239.10 ACTON MOBILE INDUSTRIES MOBILE OFFCIE RENTAL 6/20 - 7/19
7/10/2009 $239.10 ACTON MOBILE INDUSTRIES 7/20 to 8/19
8/10/2009 $239.10 ACTON MOBILE INDUSTRIES 8/20/ to
9/10/2009 $239.10 ACTON MOBILE INDUSTRIES
10/10/2009 $239.10 ACTON MOBILE INDUSTRIES thru 11/19
11/10/2009 $239.10 ACTON MOBILE INDUSTRIES thru 12/19
12/10/2009 $239.10 ACTON MOBILE INDUSTRIES Thru 1/19
1/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 2/19/10
2/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 3/19/10
3/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 4/19
4/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 5/19
5/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 6/19
6/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 7/19
7/10/2010 $239.10 ACTON MOBILE INDUSTRIES Thru 8/19
9/20/2010 $305.00 ACTON MOBILE INDUSTRIES Removal
$6,126.10 $6,126.10
12/15/2008 $140.00 POTTY QUEEN RENTAL PORTABLE TOILET - RIDLEY CRK
12/22/2008 $64.47 POTTY QUEEN RENTAL TOILET 12/23-1/10/08
2/8/2009 $95.00 POTTY QUEEN RENTAL TOILET 2/8-3/7
3/8/2009 $95.00 POTTY QUEEN RENTAL TOILET 3/8-4/4
4/5/2009 $95.00 POTTY QUEEN RENTAL TOILET 4/5-5/2
5/5/2009 $95.00 POTTY QUEEN RENTAL TOILET ????
7/26/2009 $95.00 POTTY QUEEN RENTAL 7/26 TO 8/22
8/23/2009 $95.00 POTTY QUEEN Rental 8/23 to 9/19
9/20/2009 $95.00 POTTY QUEEN RENTAL 9/20 to 10/17
10/18/2009 $95.00 POTTY QUEEN 10/18/09 to 11/14/09
11/14/2009 $95.00 POTTY QUEEN 11/15 to 12/13
12/13/2009 $95.00 POTTY QUEEN 12/13 to 1/9/10
1/10/2010 $95.00 POTTY QUEEN 1/10/10 to 2/6/10
2/7/2010 $95.00 POTTY QUEEN 2/7/10 to 3/6/10
3/7/2010 $95.00 POTTY QUEEN 3/7 to 4/3
4/4/2010 $95.00 POTTY QUEEN 4/4 to 5/1
5/2/2010 $98.80 POTTY QUEEN 5/2 to 5/29
5/30/2010 $96.90 POTTY QUEEN 5/30 to 6/26
6/30/2010 $96.90 POTTY QUEEN 6/27 to 7/24

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls

Date Amount Subtotals Name Description
7/28/2010 $96.90 POTTY QUEEN 7/25 to 8/21
$1,923.97 $1,923.97
12/22/2008 $174.65 VERIZON -7041 NOVEMBER 25 - DECEMBER 6, 2008
1/7/2009 $137.87 VERIZON -7041 BILLING DATE 1/07/09
2/7/2009 $130.34 VERIZON -7041 BILLING DATE 2/07/09
3/7/2009 $133.97 VERIZON -7041 BILLING DATE 3/7/09
4/7/2009 $136.00 VERIZON -7041 BILLING DATE 4/7/09
5/7/2009 $137.66 VERIZON -7041 BILLING DATE 5/7/09
6/7/2009 $178.47 VERIZON -7041 BILLINGDATE 6/7/2009
7/7/2009 $145.21 VERIZON -7041 Billing Date 7/7/09
8/7/2009 $134.44 VERIZON -7041 Billing Date 8/7/09
9/7/2009 $132.93 VERIZON -7041 billing date 9/7/09
10/7/2009 $133.43 VERIZON -7041 Billing date 10/7/09
11/7/2009 $133.79 VERIZON -7041 Billing Date 11/7/09
12/7/2009 $136.76 VERIZON -7041 Billing date 12/7/09
1/7/2010 $135.11 VERIZON -7041 Billing date 1/7/10
2/7/2010 $134.35 VERIZON -7041 Billing date 2/7/10
3/7/2010 $134.34 VERIZON -7041 Billing date 3/7/10
4/7/2010 $134.72 VERIZON -7041 Billing date 4/7/10
5/7/2010 $136.37 VERIZON -7041 billing ddate 5/7/2010
6/7/2010 $134.06 VERIZON -7041 Billing date 6/7/10
7/7/2010 $134.18 VERIZON -7041 Billing date 7/7/10
$2,788.65 $2,788.65
8/31/2009 $286.56 VERIZON INTERNET (FIRST BILL)
9/28/2009 $69.99 VERIZON INTERNET
10/28/2009 $69.99 VERIZON INTERNET
11/28/2009 $69.99 VERIZON INTERNET
12/28/2009 $69.99 VERIZON INTERNET
1/28/2010 $69.99 VERIZON INTERNET
2/28/2010 $69.99 VERIZON INTERNET
3/28/2010 $69.99 VERIZON INTERNET
4/28/2010 $69.99 VERIZON INTERNET
5/28/2010 $69.99 VERIZON INTERNET
6/28/2010 $69.99 VERIZON INTERNET
$986.46 $986.46
Trailer, Phone, Porta Potty & Internet Total $11,825.18

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\&[Path]RCSTP EXPANSION EXPENSES 121310.xls DETAIL

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS/RECEIPTS

December 13, 2010

Potential capital extras
Pipe conduit Conflicts
Controls $0
Sludge room retrofit
HVAC Thermostats $0
Cathode Protection $10,000
Treatment Tanks $0
Electrician (increase in wages) $20,000
UV Channel $11,357
Total potential extras $41,357 $41,357
Potential Receipts
Total Potential Receipts $0 $0

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 121310.xls POTENTIAL EXTRAS

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS

December 13, 2010

NO. AMOUNT APPROVED WORK STATUS PAID
WORTH
1 $3,209.70 2/24/09 BLOWER #1 REPAIR APPROVED NO
4 $5,542.80 5/11/09 BLOWER #2 REPAIR APPROVED NO
? $4,617.08 ???? BLOWER #3 REPAIR APPROVED NO
3 $2,703.00 12/14/09 ANTI-FLOT COLLAR APPROVED NO
5 $6,784.65 12/14/09 LARGER MIXER FOR FLOC TANK APPROVED NO
15 $4,494.52 12/14/09 REMOVABLE RAILS ON SBR TANK APPROVED NO
17 $6,126.78 3/8/10 BLOWER #4 REPAIR APPROVED NO
8 -$6,250.00 3/8/10 CREDIT FOR CAST IRON PIPE APPROVED NO
-$20,000.00 2/8/10 Credit for Electric Wages APPROVED NO
-$50,000.00 2/8/10 Credit for paving APPROVED NO
9 $27,702.20 5/20/10 air drops APPROVED NO
19 $3,516.77 5/20/10 2 doors APPROVED NO
20 $18,094.59 5/20/10 Paint DAVCO WALKWAYS APPROVED NO
21 -$13,875.00 5/20/10 Credit for concrete APPROVED NO
22 $5,932.27 6/14/10 Additional block for sludge building APPROVED NO
24 $6,671.26 11/4/10 Centrifuge Platform APPROVED NO
23 $3,050.21 11/4/10 Fence APPROVED NO
25 $4,703.27 11/8/10 Steel beam in control bldg APPROVED NO
12
18
$4,499.12 1/11/00 Control Joint Mod in Screen Bldg APPROVED NO
Total $17,523.22
CLINGER
1 $5,106.00 Denied EXTEND 34 KV LINES DENIED NO
2 $23,585.00 7/1/09 CORNER UNIT FOR MCC
SERVICE DISCONNECT
APPROVED NO
3 $3,171.00 4/12/10 Applebrook Pump APPROVED NO
4 $1,451.24 3/23/10 Cables for 2 chart recorders APPROVED NO
Total $33,313.24

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 121310.xls CHANGE ORDERS

Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com

November 30, 2010

Mr. Dan Postlewaite
Pennoni
One Drexel Plaza
3001 Market Street
Philadelphia, PA 19104

Re: Ridley Creek Sewage Treatment Plant Upgrade & Expansion
Pennoni Project# EGMA 0707
Concrete and Steel Pier for Centrifuge
PCO-26

Dear Mr. Postlewaite,

Please find attached our cost estimate sheet showing our cost of One Thousand Four Hundred Nine Dollars and Forty-Four cents ($1,409.44) to add 1 additional 12' gate in the new fence.

An extension of time of (0) days is required.

This change proposal covers only the direct cost associated with the change order work described above. We reserve the right to assess the impact of this change order at a later date and to submit these costs as they become known.

Please issue a change order for this work as soon as possible.

If you should have any questions or require additional information please do not hesitate to contact me.

Sincerely,

Jeffrey Bush
Project Manager

Cc: File
Fred Papiernik, Worth and Company
Frank Ciufo, Pennoni

[Handwritten note: ok RS 11/7/10]

PROJECT: Ridley Creek WTP ESTIMATOR: JCB ITEM NO: PCO -26
TYPE OF WORK: Additional Fence DATE: 11/30/2010 SHEET NO: 1
DESCRIPTION QUANTITY EQUIPMENT PERMANENT MATERIALS LABOR SUB CONTRACTS TOTAL DIRECT COST
U.P. TOTAL U.P. TOTAL U.P. TOTAL U.P. TOTAL U.P. TOTAL
Supply and install 1 additional 12' gate 995.00 $995.00
Project Management 1 HR 90 90 $90.00
Estimating / Engineering 1 HR 75 75 $75.00
Site Supervision / Foremen 1 HR 72 72 $72.00
Foremen's Vehicle 1 HR $0.00
Administrative 2 HR 42 84 $84.00
SUBTOTAL $0.00 $0.00 $321.00 $995.00 $1,316.00
0% $0.00
15% $0.00
5% $16.05
5% $49.75
$0.00 $0.00 $337.05 $1,044.75 $1,381.80
Bond 2% $27.64
Total $1,409.44

Rick Smith

From: Scott_Towler@URSCorp.com
Sent: Tuesday, November 30, 2010 4:08 PM
To: rsmith@eastgoshen.org; mmiller@eastgoshen.org
Cc: dbarbato@pennoni.com; devans@brickhouse-environmental.com; jyahraes@aol.com
Subject: Revised PCO-14
Attachments: 12' Gate.pdf

Rick,

Please refer to the attached PCO-14. The cost was reduced to $1,409.44.

The actual gate was $995.00 and the PM, Supervision and 10% mark up to bring the cost to $1,409.44 is in order.

I suggest adding this to change order 5 for the Board's approval at the December 13th meeting (change order 5 presently includes PCOs 12 & 13 - steel as approved at the November Authority meeting).

Scott A. Towler, PE, SEO, LO
Water/Wastewater Program Manager

URS Corporation
335 Commerce Drive, Suite 300
Fort Washington, PA 19034-2720
Tel: 215.367.2500
Direct: 215.367.2581
Mobile: 484.401.4198
Fax: 215-367-1000
scott_towler@urscorp.com

This e-mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies.

----- Forwarded by Scott Towler/FtWashington/URSCorp on 11/30/2010 03:54 PM -----

Jeff Bush <JBush@worthandcompany.com> To "Scott_Towler@URSCorp.com" <Scott_Towler@URSCorp.com>
11/30/2010 03:42 PM cc
Subject

Scott,

This CO would take the place of the PCO with the man gates added also. This is for only the additional 12' gate back by the Screen Building.
Any questions please do not hesitate to contact me.

Thanks,

1

Jeff

Jeffrey Bush
Project Manager
Worth and Company,Inc.
6263 Kellers Church Road
Pipersville, PA. 18947
Ph: 267-362-1100
Fx: 267-362-1130
Cell: 215-669-6879
Email: JBush@worthandcompany.com

2

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 6, 2010

Dear Resident,

The expansion of the treatment plant has been completed. The only outstanding item is the removal of the temporary parking area which is scheduled to be removed by the end of the year. Once that is removed we will restore all disturbed areas.

On behalf of the Municipal Authority I would personally like to thank-you for your patience during the construction. Should you have any questions regarding to the new operation please don't hesitate to contact me at 610-692-7171.

Sincerely,

Mark S. Miller
Director of Public Works
East Goshen Township

F:\Data\Shared Data\Public Works Dept\Ridley Creek\Ltr. for residents for completion on sewer plant 2010 December 6.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 2, 2010

To: Municipal Authority

From: Mark

Re: Landscape Screening

I would like to complete the landscaping between the SBR tanks and the homes backing up to the plant.

The cost would be $1,250.00, Public Works will plant the tree’s.

F:\Data\Shared Data\Public Works Dept\Municipal Authority\memo to municipal authority for landscape screening 2010 December 2.doc

Pennoni

MEMORANDUM

TO: Dan Barbato
FROM: Tim Daily
DATE: November 23, 2010
SUBJECT: East Goshen Township Ridley Creek WWTP Walk Through, Wednesday, November 17, 2010

1.0 INTRODUCTION

Tim Daily and Tom Horrex completed a walkthrough of the East Goshen system. The purpose of the walk through was to review the treatment plant function and operation. We were periodically joined by Scott Towler.

2.0 GENERAL COMMENTS

Listed below are general comments. Each indivual part of the process is discussed in additional detail below.
The plant is being operated consistent with the design intent with these exceptions.

  • Alkalinity in the form of sodium bicarbonate solution is not being added to the influent channel. (Appears to be a kinked hose)
  • The sodium bicarbonate metering pump is not being flow paced. (4-20 mA connection appears not to have been made)
  • The influent pumps are cycling on and off. VFD control of the influent sump liquid level is not occurring.
  • The SBR mixed liquor level seem elevated for the current organic load. (Sludge wasting has been increased to bring solids down)
  • The UV channel has overflowed and the UV modules have over topped.
  • Decanter actuator mechanism seems to move too quickly and can overload SBR influent.

More operator training in the SBR process is required so that the operators have a better handle on the day to day adjustments that need to be made.
Many of the problems that were identified are associated with the system controls. Now that the system has been running, time needs to be invested into the system so that any controls problems can be identified and either tuned or adjusted with existing controls or add additional programming. For example, Tom Horrex recommended adding a delay timer to the start of sludge digester decanting.
Many of the system alarms are disabled.

C:\Users\nmonaghan\Documents\Memo.docx

1

3.0 SCREEN BUILDING

There is a build-up of grit in the Influent Channel upstream of the grinder.
If the grinder is lifted, the water velocity upstream of the screen greatly increases.
The screen is capturing about a ½ bag per day of material.
It appears that there is a malfunctioning ultrasonic transmitter. JWC is in the process of addressing.

4.0 INFLUENT PUMPS

The Influent Control Panel is not alarming the Autodialer
The influent pumps are not running in level control. They are currently are operating with on/off control.
It appears that the Influent Pump #2 check valve lever needs to be adjusted. There is some water hammer when the pump turns off. The VFD ramp down could also be adjusted.
The Influent Pumps are not maintaining a liquid level in the wet well. They seem to be cycling on and off.

5.0 SODA ASH FEED

The Influent Soda Ash pump is not working. Tom reports that the Marlow representative claimed that the pump was working correctly and that the 4-20 mA signal to drive the pump was not installed or working properly.
The existing diaphragm pump does not seem to be pumping. The level in the tank is not receding with time. This started to occur after the flexible PVC tubing was installed in the carrier tube.
It is suspected that the tubing kinked as it went through the carrier pipe, which has formed a blockage and is preventing the soda ash solution from flowing through the tubing.

6.0 SBR

A number of the equipment elapse timers are not working
The HMI software seems to have gaps in data collection. When a trend is shown on the computer screen there are periods of time where the trend is black and no trend lines are shown. The black areas are similar in appearance as future time, which has no data.
Two of the five blower VFD’s have failed. The GE service tech was investigating the problem during the walk through. It was determined that there is a loose wire in the VFD which shorted causing the failure. It was suggested that the other three VFD’s be checked.
Jet mixer pump cable collects rags, which does not let the grab fitting to slide down a thin cable and hook the pump . Township will change out the thin cable with either dedicated chain or cables.

7.0 SBR OPERATION

The SBR is experiencing foaming. The foam has changed in recent months to a dark foam to a lighter color foam.
Tom’s assessment of a sample of settled mixed liquor is that it is old sludge looked old.
Tom also thinks that the sludge is over aerated. The aeration of the basins will be cut back.

C:\Users\nmonaghan\Documents\Memo.docx

2

Scott reported Mixed liquor levels of around 3,000 mg/l. Given the current loading, 3,000 mg/l mixed liquor, and three SNR’s on line, one would suspect that the sludge age is old and the volatile content is down. This will cause foaming, pin floc, bulking settled sludge, and discoloration. Scott is beginning to waste more sludge. We suspect that a target mixed liquor level is between 2,000 and 2,500 mg/l.
A 1 liter sludge sample settled to approximately 500 ml in 20 minutes. Within the next 20 minutes it all floated to the top. This is an indication of denitrification. Siemens is indicating that it is trapped air and not denitrification.
Tom believes that the operators need additional training in the inner workings of the Jet Tech system.
The SBR alum feed delay is 30 minutes. The timer range should be expanded so that alum could be feed near the end of the react step.
SBR Alum Feed Pump does not function. Clinger and the Marlow Watson chemical pump tech think that traced the wiring and believe that the problem is in the Siemens panel.

8.0 FILTER FEED PUMPS

The filter feed pumps were operating at 300 GPM, 40% speed, and 4.5 ft of water
The Filter Feed pumps need to be removed to check oil.
The Filter feed pump PID controllers are experiencing controller wind-up. When the pumps start the output to the pump’s VFD is 100%, which causes a whoosh of water. A bumpless transfer should be incorporated into the logic to make the operation smoother.
The operation intent of the filter panel design was reviewed. The pumps will operate at a set flow rate from low level to mid level. If the level in the tank should rise about the mid level point, the flow rate will be increase proportionately to the tank level. At high tank level, the pumps will be operating at maximum flow.
There is a question concerning the setting of a maximum flow rate. With two pumps running near maximum output, the flow can over whelm the UV channel. The operators requested a maximum flow rate set point. This rate would be 3.0 MGD or 2,083 GPM. Adjustments were made to the flow and level set points so that the pumps will react sooner to an increase in influent flow.

9.0 FILTERS

The SBR is currently producing effluent with phosphorous concentrations of less than 2 ppm.
The intended operation of the SBR / filter alum and polymer feed was reviewed. Alum should be added to the SBR at the near the end of the react step, so that as much phosphorous can be taken in by the phosphorous bacteria. The ratio is typically 1 pound of phosphorous to 2 pounds of aluminum. This will typically reduce the phosphorous concentration to between 0.7 and 0.8 PPM. Alum is now added to filter feed upstream of the floc tank at a ratio of 1 pound of phosphorous to 5 pounds of aluminum. This loading typically drives down the phosphorous concentration to below 0.5 ppm.
The filters will initiate a backwash cycle based on either high level in the tank or time. The time is currently set to backwash every 120 minutes. Aqua suggests increasing the time to 240 minutes.

C:\Users\nmonaghan\Documents\Memo.docx

3

The filter alarms have been turned off because there have been a number of nuisance alarms.

10.0 UV CHANNEL

The UV channel has over flowed and the UV modules have overtopped at high flows.
The UV finger weirs do not become swamped at these higher flow rates.
The rated flow for the unit is 3.0 MGD or 2,083 GPM.
The flow rate, at which over tops the UV modules, has not been quantified.
There is a distribution plate which the last row of holes was half covered at 820 GPM.
The Filter Feed Pumps need to have a maximum flow set point so that the flow through the UV can be maintained at or below their rating

11.0 SLUDGE DIGESTER

There is confusion on the operation of the Decanting mechanism.
There are reports that a high rate of decant has caused the SBR to go into a Fill/Decant treatment cycle.
The design intent is that the decant time duration is the sum of operator selected decant on time and off time. The decanter moves down in this step wise fashion until low level is hit. This allows the decanter to move through the decant height in small increments so that the flow rate is controlled.
Looking at the decant graphic, it looked like the controls may have been set-up as intended. There is a duration setting for decanting and a starting height and an ending height. The current operation should be compared to the intended operation.
It was suggested that a delay timer be added to the decant screen so that decant could be delayed to the early morning hours.

12.0 RECOMMENDATIONS

Need to check all the alarms and autodialer for proper function and reporting
Get sodium bisulfate pump working
Replace alkalinity tubing with either hose or a more ridged tubing.
Check SBR Blower VFD’s for loose wires
Determine sludge digester pump flow
Characterize filter feed pumping for one pump and two pump operation
Determine if a maximum two pumps running pump speed is required
Review PLC logic and equipment operation with programmer and engineer for these processes:

  • Influent Feed pumps
  • Sodium Bicarbonate Pumps
  • Filter Feed Pumps
  • Sludge Decanter

Determine cause of SBR HMI data gaps
Change Filter Feed Pump PID loop programming to include anti-wind-up feature.

C:\Users\nmonaghan\Documents\Memo.docx

4

Start adding alum to SBR
Add longer on delay timer from SBR alum addition
Increase timed backwash interval to 240 minutes
Investigate UV channel height when Filter Feed Pumps are running at 2,083 GPM.
Multiple decants may need to be stored so that a long enough run time can be investigated.
Add sludge decanter delay on timer

C:\Users\nmonaghan\Documents\Memo.docx

5

FASTENAL

Remit to:
Fastenal Company
P.O. Box 1286
Winona, MN 55987-1286

For billing questions:
30 Three Tun Road, Suite 3
MALVERN, PA 19355
United States
Phone (610)-648-9278
Fax (610)-648-9285

INVOICE

Page 1 of 1

Date: 11/18/2010
Invoice No.: PAMAV4919
Due Date: 12/18/2010
Invoice Total: 2,474.04 USD

Cust. No.: PAMAV0136
Cust. P.O.:
Job No.: ridley creek pl

Sold To:
E. GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107

Ship To:
E. GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6199

[Handwritten: 27239]

This Order and Document is subject to the "Terms of Purchase" posted on www.fastenal.com.

Line No Quantity Ordered Quantity Shipped Quantity Backordered Description Control No. Part No. Price / Hundred Amount
1 8 8 0 SS C PIN 3/8X2 120080739 0120672 288.0000 23.04
2 200 200 0 3/8" 304 S/S PROOF C MLPA0375 12535-00245 1,200.0000 2,400.00

*** Fastenal now has the ability to email or fax invoices. To enroll please call 866-880-3278.

APPROVED BY: [Signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-7454
[Handwritten: Pump chain.]

[Handwritten: Ok RS 12/15]

Received By:

Comments:
Contact: MARK MILLER

Tax Exemption: 7771 G

Subtotal 2,423.04
Shipping & Handling 51.00
PA State Tax 0.00
County Tax 0.00
City Tax 0.00
Total 2,474.04

Reasonable collection and attorneys fees will be assessed to all accounts placed for collection.
No materials accepted for return without our permission. All discrepancies must be reported within 10 days.

Please pay from this invoice.

If you re-package or re-sell this product, you are required to maintain integrity of Country of Origin to the consumer of this product.

Invoice: PAMAV4919 Cust: PAMAV0136

3-01-0009227

Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454

Bill To: 658
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Job:
Miscellaneous

Invoice: 1622530MB      Plant: MALVERN BLACKTOP      Page 1 of 1

Project No Invoice Date Purchase Order Payment Terms
MISCELLA 11/05/10 NET 30
Date Ticket Product Quantity U/M Unit Price Tax Total
11/05 00202021 19MM B .3<3 V P 10.0060 TONS 45.7000 0.00 457.27
11/05 00202028 19MM B .3<3 V P 10.0140 TONS 45.7000 0.00 457.64
11/05 00202037 19MM B .3<3 V P 10.0090 TONS 45.7000 0.00 457.41
11/05 00202041 19MM B .3<3 V P 9.9790 TONS 45.7000 0.00 456.04

Product Summary

Product Description Quantity UOM
1061303 19MM B .3<3 V P 40.0080 TONS

[Handwritten: OK TJ]

Material Transp. Misc. Tax Invoice Amt Receipt Amt Balance Due
$1,828.36 $0.00 $0.00 $0.00 $1,828.36 $0.00 $1,828.36

Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454

Bill To: 658
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Job:
Miscellaneous

Invoice: 11025998MB      Plant: DOWNINGTOWN ASPHALT      Page 1 of 1

Project No Invoice Date Purchase Order Payment Terms
MISCELLA 11/05/10 NET 30
Date Ticket Product Quantity U/M Unit Price Tax Total
11/05 00285323 ID2B 10.0830 TONS 45.5000 0.00 458.78
11/05 00285331 19MM B .3<3 9.9480 TONS 46.1500 0.00 459.10
11/05 00285338 19MM B .3<3 9.9980 TONS 46.1500 0.00 461.41
11/05 00285343 19MM B .3<3 10.0160 TONS 46.1500 0.00 462.24

Product Summary

Product Description Quantity UOM
1010201 ID2B 10.0830 TONS
1011303 19MM B .3<3 29.9620 TONS

[Handwritten: OK TJ]

Material Transp. Misc. Tax Invoice Amt Receipt Amt Balance Due
$1,841.53 $0.00 $0.00 $0.00 $1,841.53 $0.00 $1,841.53

Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454

Bill To: 658
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Job:
Miscellaneous

Invoice: 11026142MB      Plant: DOWNINGTOWN ASPHALT      Page 1 of 1

Project No Invoice Date Purchase Order Payment Terms
MISCELLA 11/18/10 NET 30
Date Ticket Product Quantity U/M Unit Price Tax Total
11/18 00285963 9.5MM .3<3 5.0080 TONS 52.0000 0.00 260.42

Product Summary

Product Description Quantity UOM
1011110 9.5MM .3<3 5.0080 TONS

[Handwritten: OK TJ]

Material Transp. Misc. Tax Invoice Amt Receipt Amt Balance Due
$260.42 $0.00 $0.00 $0.00 $260.42 $0.00 $260.42

Remit To:
HIGHWAY MATERIALS, INC.
PO BOX 8500 LOCKBOX #2686
PHILA, PA 19178-2686
610-832-8000

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454

Bill To: 658
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
Job:
Miscellaneous

Invoice: 11026121MB      Plant: DOWNINGTOWN ASPHALT      Page 1 of 1

Project No Invoice Date Purchase Order Payment Terms
MISCELLA 11/17/10 NET 30
Date Ticket Product Quantity U/M Unit Price Tax Total
11/17 00285852 ID3 9.9820 TONS 47.9000 0.00 478.14
11/17 00285853 ID3 9.9750 TONS 47.9000 0.00 477.80
11/17 00285881 ID3 3.9900 TONS 47.9000 0.00 191.12

Product Summary

Product Description Quantity UOM
1010402 ID3 23.9470 TONS

[Handwritten: Ok RS]

Material Transp. Misc. Tax Invoice Amt Receipt Amt Balance Due
$1,147.06 $0.00 $0.00 $0.00 $1,147.06 $0.00 $1,147.06

Application and Certificate For Payment

Page 1

To Owner:
East Goshen Municipal Authorit
1580 Paoli Pike
West Chester, PA 19380
Project:
Ridley Creek WWTP
1751 Towne Road
Fred Papiernik 267-278-6108
West Chester, PA 19380
Application No: 24
Period To: 11/30/10
Architect's Project No:
Contract Date: 10/22/08
Date: 11/30/2010
From (Contractor):
Worth and Company, Inc.
6263 Kellers Church Road
Pipersville, PA 18947
Phone: 267 362-1100
Contractor Job Number: P28001
Via (Architect):
Contract For:

Contractor's Application For Payment

Original contract sum 7,865,400.00
Net change by change orders 4,024.34
Contract sum to date 7,869,424.34
Total completed and stored to date 7,869,424.34
Retainage
1.3% of completed work: 99,058.22
0.0% of stored material: 0.00
Total retainage 99,058.22
Total earned less retainage 7,770,366.12
Less previous certificates of payment 7,645,366.12
Current payment due 125,000.00
Balance to finish, including retainage 99,058.22

Change Order Summary

Change orders approved in previous months by owner Additions Deductions
Approved in previous months 46,672.59 -42,648.25
Approved this month
Totals 4,024.34
Net change by change orders 4,024.34

The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief the work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.

Contractor: [Signature: Ann Bowman]      Date: 12/02/10

State of: PA      County of: Bucks
Subscribed and sworn to before me this 2nd day of December 2010 (year).
Notary Public: [Signature: Linda D. Nelson]
My commission expires: [Notarial Seal: Linda D. Nelson, Notary Public, Plumstead Twp., Bucks County, My Commission Expires Sept. 19, 2014]

[Handwritten: OK RS 12/10]

Architect's Certificate for Payment

In accordance with the Contract Documents, based on on-site observations and the data comprising the above application the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.

Amount Certified: $ 125,000
Architect: [Signature: Dan Barbato]      Date: 12/7/10
This Certification is not negotiable. The Amount Certified is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

Application and Certificate For Payment -- page 2

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP

Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
CO-001 Blower Repairs 3,209.70 3,209.70 0.00 0.00 3,209.70 100.00 0.00 40.40
CO-001A Anit Flotation Collar 2,703.00 2,703.00 0.00 0.00 2,703.00 100.00 0.00 34.02
CO-001B Blower 2 repairs 5,542.80 5,542.80 0.00 0.00 5,542.80 100.00 0.00 69.77
CO-001C Top Entry Mixer change 6,784.65 6,784.65 0.00 0.00 6,784.65 100.00 0.00 85.40
CO-001D SBR Handrail 4,494.52 4,494.52 0.00 0.00 4,494.52 100.00 0.00 56.58
CO-001E Blower 3 Repairs 4,617.08 4,617.08 0.00 0.00 4,617.08 100.00 0.00 58.12
CO-001F Paving Credit -50,000.00 -50,000.00 0.00 0.00 -50,000.00 100.00 0.00 -629.39
CO-001G SBR Wall Credit -20,000.00 -20,000.00 0.00 0.00 -20,000.00 100.00 0.00 -251.75
CO-002 PVC Credit Lieu of Cast Iron -6,250.00 -6,250.00 0.00 0.00 -6,250.00 100.00 0.00 -78.67
CO-002A Concrete Wall @ UV Channel 11,357.25 11,357.25 0.00 0.00 11,357.25 100.00 0.00 142.96
CO-002B Blower 4 Repairs 6,126.78 6,126.78 0.00 0.00 6,126.78 100.00 0.00 77.12
CO-003 (24) Air Drops 27,702.20 27,702.20 0.00 0.00 27,702.20 100.00 0.00 348.71
CO-003A New Doors 3,516.77 3,516.77 0.00 0.00 3,516.77 100.00 0.00 44.27
CO-003B Paint Digester Walkway 18,094.59 18,094.59 0.00 0.00 18,094.59 100.00 0.00 227.77
CO-003C Digester Concrete Credit -13,875.00 -13,875.00 0.00 0.00 -13,875.00 100.00 0.00 -174.65
Subtotal 4,024.34 4,024.34 0.00 0.00 4,024.34 100.00 0.00 50.66
G1-000 Site Work & Yard Piping
G1-001 Bonds 160,000.00 160,000.00 0.00 0.00 160,000.00 100.00 0.00 2,014.04
G1-002 Insurance 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 629.39
G1-003 Mobilization 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00 0.00 1,258.77
G1-004 Pre-Planning/Schedule 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G1-005 Submittals - Dutchland 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G1-006 Submittals - Jet Tech 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G1-007 E & S Controls 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G1-008 Strip Topsoil 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 629.39
G1-009 Temporary Seed 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 62.94

Application and Certificate For Payment -- page 3

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP

Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G1-010 Bioretention Basin 1 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G1-011 Bioretention Basin 2 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G1-012 Temporary Fence 9,000.00 9,000.00 0.00 0.00 9,000.00 100.00 0.00 113.29
G1-013 Influent Force Main 85,000.00 85,000.00 0.00 0.00 85,000.00 100.00 0.00 1,069.96
G1-014 Filter Feed Force Main 85,000.00 85,000.00 0.00 0.00 85,000.00 100.00 0.00 1,069.96
G1-015 Filter Effluent 55,000.00 55,000.00 0.00 0.00 55,000.00 100.00 0.00 692.33
G1-016 System Effluent 55,000.00 55,000.00 0.00 0.00 55,000.00 100.00 0.00 692.33
G1-017 Filter Feed Pump Suction 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G1-018 Filter Feed Pump Discharge 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G1-019 Flocculation Tank to Filters 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 629.39
G1-020 4" WAS 45,000.00 45,000.00 0.00 0.00 45,000.00 100.00 0.00 566.45
G1-021 Yard Drain 70,000.00 70,000.00 0.00 0.00 70,000.00 100.00 0.00 881.14
G1-022 Sludge Pump Suction 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G1-023 Relocate Air Lines 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G1-024 Influent 45,000.00 45,000.00 0.00 0.00 45,000.00 100.00 0.00 566.45
G1-025 Utility Water 75,000.00 75,000.00 0.00 0.00 75,000.00 100.00 0.00 944.08
G1-026 Apple Brook Discharge 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G1-027 PVC Chemical Carrier Pipe 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G1-028 Potable Water 45,000.00 45,000.00 0.00 0.00 45,000.00 100.00 0.00 566.45
G1-029 8" Underdrain 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00 0.00 503.51
G1-030 1" Compressed Air 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G1-031 Sidewalks 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G1-032 VOID
G1-033 VOID
G1-034 Block 1,000.00 1,000.00 0.00 0.00 1,000.00 100.00 0.00 12.59
G1-035 Chain Link Fence 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 377.63

Application and Certificate For Payment -- page 4

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G1-036 Demo Existing Fence 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
Subtotal 1,345,000.00 1,345,000.00 0.00 0.00 1,345,000.00 100.00 0.00 16,930.52
G2-000 Pump Station & Valve Vault
G2-001 Excavate Pump Station 52,000.00 52,000.00 0.00 0.00 52,000.00 100.00 0.00 654.56
G2-002 Install Precast Pump Station 68,000.00 68,000.00 0.00 0.00 68,000.00 100.00 0.00 855.97
G2-003 Install Anti-Flotation Collar 3,500.00 3,500.00 0.00 0.00 3,500.00 100.00 0.00 44.06
G2-004 Backfill Pump Station 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 151.05
G2-005 Excavate Valve Vault 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G2-006 Install Valve Vault 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00 0.00 352.46
G2-007 Backfill Valve Vault 7,500.00 7,500.00 0.00 0.00 7,500.00 100.00 0.00 94.41
G2-008 Painting 9,000.00 9,000.00 0.00 0.00 9,000.00 100.00 0.00 113.29
G2-009 Pipe/Valves/Fittings 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G2-010 Influent Pumps 65,000.00 65,000.00 0.00 0.00 65,000.00 100.00 0.00 818.20
Subtotal 275,000.00 275,000.00 0.00 0.00 275,000.00 100.00 0.00 3,461.64
G3-000 Screen Building
G3-001 Excavate Screen Bldg; Elev 13' 38,000.00 38,000.00 0.00 0.00 38,000.00 100.00 0.00 478.33
G3-002 Stone Underslab 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 62.94
G3-003 Form/Pour 18" Thick Slab 39,000.00 39,000.00 0.00 0.00 39,000.00 100.00 0.00 490.92
G3-004 Form/Pour Exterior Walls 65,000.00 65,000.00 0.00 0.00 65,000.00 100.00 0.00 818.20
G3-005 Backfill 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 151.05
G3-006 Excavate Footers; Elev 2'8" 7,000.00 7,000.00 0.00 0.00 7,000.00 100.00 0.00 88.11
G3-007 Form/Pour Footers 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 151.05
G3-008 Install Masonry Frost Wall 9,000.00 9,000.00 0.00 0.00 9,000.00 100.00 0.00 113.29
G3-009 Pour Slab 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
G3-010 Form/Pour Channel Walls 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 629.39
G3-011 Install Exterior Masonry Walls 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 377.63

Application and Certificate For Payment -- page 5

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP

Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G3-012 Structural Steel 3,000.00 3,000.00 0.00 0.00 3,000.00 100.00 0.00 37.76
G3-013 Misc Metals 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
G3-014 Rough Carpentry 24,000.00 24,000.00 0.00 0.00 24,000.00 100.00 0.00 302.11
G3-015 Dryvit 18,000.00 18,000.00 0.00 0.00 18,000.00 100.00 0.00 226.58
G3-016 FRP Grating 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00 0.00 50.35
G3-017 Hollow Metal & FRP Doors 1,500.00 1,500.00 0.00 0.00 1,500.00 100.00 0.00 18.88
G3-018 Overhead Doors 17,500.00 17,500.00 0.00 0.00 17,500.00 100.00 0.00 220.29
G3-019 Trolley & Hoist 2,000.00 2,000.00 0.00 0.00 2,000.00 100.00 0.00 25.18
G3-020 Plumbing 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 62.94
G3-021 HVAC 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
G3-022 Painting 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 151.05
Subtotal 380,000.00 380,000.00 0.00 0.00 380,000.00 100.00 0.00 4,783.33
G4-000 Grinder w/RotatingScreen&Auger
G4-001 Screen 180,000.00 180,000.00 0.00 0.00 180,000.00 100.00 0.00 2,265.79
Subtotal 180,000.00 180,000.00 0.00 0.00 180,000.00 100.00 0.00 2,265.79
G5-000 PrecastPost TensionedSBR Tanks
G5-001 Bulk Excavate SBR Structure 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00 0.00 1,258.77
G5-002 Stone Underslab-SBR Structure 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 377.63
G5-003 Concrete Base Slab for SBR 690,000.00 690,000.00 0.00 0.00 690,000.00 100.00 0.00 8,685.53
G5-004 Backfill Tank 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G5-005 Walls & Walkways 750,000.00 750,000.00 0.00 0.00 750,000.00 100.00 0.00 9,440.80
G5-006 Misc Metals 60,000.00 60,000.00 0.00 0.00 60,000.00 100.00 0.00 755.26
Subtotal 1,650,000.00 1,650,000.00 0.00 0.00 1,650,000.00 100.00 0.00 20,769.74
G6-000 Treatment Building
G6-001 Excavate Footers 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00 0.00 503.51
G6-002 Pour Footers 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82

Application and Certificate For Payment -- page 6

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP

Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G6-003 Pour Pier Footers 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
G6-004 Pour Piers 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
G6-005 Masonry Frost Walls 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 188.82
G6-006 Backfill 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
G6-007 Stone Under Slab 6,000.00 6,000.00 0.00 0.00 6,000.00 100.00 0.00 75.53
G6-008 Plumbing Under Slab 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
G6-009 Concrete Slab 18,000.00 18,000.00 0.00 0.00 18,000.00 100.00 0.00 226.58
G6-010 Precast Flocculation Tank 35,000.00 35,000.00 0.00 0.00 35,000.00 100.00 0.00 440.57
G6-011 Precast Effluent Storage Tank 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G6-012 Poured In Place UV Channel 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G6-013 Masonry 72,000.00 72,000.00 0.00 0.00 72,000.00 100.00 0.00 906.32
G6-014 Structural Steel & Deck 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00 0.00 352.46
G6-015 Misc Metals 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G6-016 FRP Grating 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
G6-017 Dryvit 35,000.00 35,000.00 0.00 0.00 35,000.00 100.00 0.00 440.57
G6-018 EPDM Roofing 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00 0.00 503.51
G6-019 Caulking 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 62.94
G6-020 Hollow Metal & FRP Doors 2,500.00 2,500.00 0.00 0.00 2,500.00 100.00 0.00 31.47
G6-021 Overhead Doors 19,500.00 19,500.00 0.00 0.00 19,500.00 100.00 0.00 245.46
G6-022 Painting 35,000.00 35,000.00 0.00 0.00 35,000.00 100.00 0.00 440.57
G6-023 Top Entry Mixer 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G6-024 Plumbing 23,000.00 23,000.00 0.00 0.00 23,000.00 100.00 0.00 289.52
G6-025 HVAC 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 629.39
Subtotal 575,000.00 575,000.00 0.00 0.00 575,000.00 100.00 0.00 7,237.96
G7-000 SBR/Chem Feed & Process Piping
G7-001 SBR Equipment 790,000.00 790,000.00 0.00 0.00 790,000.00 100.00 0.00 9,944.31

Application and Certificate For Payment -- page 7

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G7-002 Polymer Feed System 18,000.00 18,000.00 0.00 0.00 18,000.00 100.00 0.00 226.58
G7-003 Chem Feed Pumps & Piping 18,000.00 18,000.00 0.00 0.00 18,000.00 100.00 0.00 226.58
G7-004 Inline Static Mixers 25,500.00 25,500.00 0.00 0.00 25,500.00 100.00 0.00 320.99
G7-005 Inline Grinder 8,500.00 8,500.00 0.00 0.00 8,500.00 100.00 0.00 107.00
G7-006 Utility Water Pumps & Controls 80,000.00 80,000.00 0.00 0.00 80,000.00 100.00 0.00 1,007.02
G7-007 Instrumentation & Controls 127,000.00 127,000.00 0.00 0.00 127,000.00 100.00 0.00 1,598.64
G7-008 FRP Chemical Tank 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
G7-009 Process Piping 245,000.00 245,000.00 0.00 0.00 245,000.00 100.00 0.00 3,083.99
G7-010 Relocated Apple Brook Pump 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
Subtotal 1,345,000.00 1,345,000.00 0.00 0.00 1,345,000.00 100.00 0.00 16,930.50
G8-000 Filtration & UV System
G8-001 Disk Filters 470,000.00 470,000.00 0.00 0.00 470,000.00 100.00 0.00 5,916.23
G8-002 Filter Feed Pumps 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
G8-003 UV System 180,000.00 180,000.00 0.00 0.00 180,000.00 100.00 0.00 2,265.79
Subtotal 660,000.00 660,000.00 0.00 0.00 660,000.00 100.00 0.00 8,307.90
G9-000 Sludge Digestion & Post EQ Tank
G9-001 Demo Interior 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G9-002 Sandblasting & Painting 160,000.00 160,000.00 0.00 0.00 160,000.00 100.00 0.00 2,014.04
G9-003 Course Bubble Diffuser 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 377.63
G9-004 Centrifugal Blower Recondition 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
G9-005 Aeration Tank Rehabilitation 45,000.00 45,000.00 0.00 0.00 45,000.00 100.00 0.00 566.45
Subtotal 275,000.00 275,000.00 0.00 0.00 275,000.00 100.00 0.00 3,461.62
GG10-000 Sludge Dewatering BldgAddition
GG10-001 Demo Centrifuge 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
GG10-002 Demo Building 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
GG10-003 Sawcut Floor 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70

Application and Certificate For Payment -- page 8

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 24
Date: 11/30/10
Period To: 11/30/10
Contractor's Job Number: P28001
Architect's Project No:

Item Number Description Scheduled Value Work Completed: Previous Application Work Completed: This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
GG10-004 Excavate Footers 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 151.05
GG10-005 Form & Pour Footers 8,000.00 8,000.00 0.00 0.00 8,000.00 100.00 0.00 100.70
GG10-006 Masonry Frost Walls 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 251.75
GG10-007 Backfill 6,000.00 6,000.00 0.00 0.00 6,000.00 100.00 0.00 75.53
GG10-008 Underslab Plumbing 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 62.94
GG10-009 Misc Metals 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
GG10-010 Pour Concrete Slab 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 125.88
GG10-011 Masonry Walls 35,000.00 35,000.00 0.00 0.00 35,000.00 100.00 0.00 440.57
GG10-012 Dryvit 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00 0.00 314.69
GG10-013 Frames & Doors 1,500.00 1,500.00 0.00 0.00 1,500.00 100.00 0.00 18.88
GG10-014 Overhead Doors 6,000.00 6,000.00 0.00 0.00 6,000.00 100.00 0.00 50.35
GG10-015 Trolley & Hoist 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00 0.00 490.92
GG10-016 Carpentry 39,000.00 39,000.00 0.00 0.00 39,000.00 100.00 0.00 251.75
GG10-017 Painting 20,000.00 20,000.00 0.00 0.00 20,000.00 100.00 0.00 62.94
GG10-018 Plumbing 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 94.41
GG10-019 HVAC 7,500.00 7,500.00 0.00 0.00 7,500.00 100.00 0.00 6,608.56
GG11-000 Sludge DewateringSystem & Pipe
GG11-001 Centrifuge 525,000.00 525,000.00 0.00 0.00 525,000.00 100.00 0.00 88.11
GG11-002 Progressive Conveying System 7,000.00 7,000.00 0.00 0.00 7,000.00 100.00 0.00 226.58
GG11-003 Sludge Conveying System 18,000.00 18,000.00 0.00 0.00 18,000.00 100.00 0.00 2,517.55
GG11-004 Process Pipe 200,000.00 200,000.00 0.00 0.00 200,000.00 100.00 0.00 629.39
GG12-000 Site Paving
GG12-001 Lump Sum 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 55.39
GG13-000 Engineered Fill
GG13-001 Lump Sum 4,400.00 4,400.00 0.00 0.00 4,400.00 100.00 0.00
GG14-000 Flowable Fill

Application and Certificate For Payment -- page 9

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP

Application No: 24
Contractor's Job Number: P28001
Architect's Project No:

Date: 11/30/10
Period To: 11/30/10

Item Number Description Scheduled Value Work Completed Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
Previous Application This Period
GG14-001 Lump Sum 11,000.00 11,000.00 0.00 0.00 11,000.00 100.00 0.00 138.47
GG18-000 Alternate G-18
GG18-001 Lump Sum 125,000.00 125,000.00 0.00 0.00 125,000.00 100.00 0.00 1,573.46
Subtotal 1,180,400.00 1,180,400.00 0.00 0.00 1,180,400.00 100.00 0.00 14,858.56
Application Total 7,869,424.34 7,869,424.34 0.00 0.00 7,869,424.34 100.00 0.00 99,058.22

Brickhouse Environmental
Consultants and Engineers

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Invoice number: 5683
Date: 12/1/2010

Client ID: 548

Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering

Attn: Mr. Rick Smith, Township Manager

SEE PROJECT ACCOMPLISHMENTS ATTACHED.

Professional Services Rendered Through the Month of November 2010.

Labor

Employee Type Hours Amount
Project Manager 86.50 9,947.50
Labor Total 86.50 9,947.50
Reimbursable Amount
Expense Total 0.00
Invoice Total 9,947.50

OK RS
12/10/10

Payment Terms: Net Thirty (30) Days; Credit Cards Accepted

515 South Franklin St
West Chester, PA 19[382]
Phone 610.692.5[...]
Fax 610.692.8[...]
www.brickhouse-environmental[...]
Where Creativity & Experience Count

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule Supplement

Brickhouse's contract for project management was originally anticipated to be completed week ending August 8, 2010 at 1,522 hours and $175,030.

From April through October 2010, Brickhouse spent 100 hours on out of scope matters that were included in the total hours.

The duration was extended to week ending October 10, 2010 and attendance at the October 11, 2010 Authority meeting which then expended the original 1,522 h

The Board subsequently approved Brickhouse Environmental to continue to serve the Authority's needs as requested on a T&M basis.

Monthly Project Management Subtotals Beyond the Original Budget

Month Project Subtotals
Pro. Mgt. Hours Cumulative Hours Cumulative Fees Monthly Fees
October 2010 36.25 36.25 $4,168.75 $4,168.75
November 2010 86.50 122.75 $14,116.25 $9,947.50

Project Cumulating Totals

Project Management Hours Fee
1,644.75 $189,146.25

Page 1 of 1
J:\092532.0\Project Management\PM Schedule\Extended Schedule.xls

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 457258
Invoice Date: 11/23/2010
Project: EGMA0707
Project Name: RCSTP Expansion

For Services Rendered through: 11/07/2010

Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist development and progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss punchlists with contractors.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Permit Design est. $111,400.00 $111,385.00 $111,385.00 $0.00
02 -- Permitting est. $14,200.00 $14,184.00 $14,184.00 $0.00
03 -- Final Design est. $226,700.00 $226,655.50 $226,655.50 $0.00
04 -- Bidding est. $14,500.00 $14,446.50 $14,446.50 $0.00
05 -- Construction est. $136,200.00 $136,197.62 $136,197.62 $0.00
06 -- Additional Submittals est. $20,000.00 $19,997.18 $19,997.18 $0.00
10 -- Continued Construction Services est. $192,320.00 $183,550.57 $187,648.32 $4,097.75
Total : $715,320.00 $706,416.37 $710,514.12 $4,097.75

Amount Due This Invoice: $4,097.75

OK RS

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA0707 Invoice Summary.xls
Invoice Date 11-23-2010

Project: RCSTP Expansion and Upgrade
Pennoni Job No.: EGMA0707
Invoice No: 457258
Invoice Period: 10/18/2010 to 11/7/2010

Initial Authorization: $ 465,000.00 Date: 8/14/2007
Changes: $ - Date: 2/5/2009
Changes: $ 58,000.00 Date: 5/11/2009
Changes: $ 99,700.00 Date: 1/11/2010
Changes: $ 22,000.00 Date: 5/10/2010
Changes: $ 11,500.00 Date: 6/14/2010
Changes: $ 40,400.00 Date: 8/5/2010
Changes: $ 18,720.00 Date: 10/11/2010
Contract Amount: $ 715,320.00
Previously Invoiced: $ 706,416.37
Current Invoice: $ 4,097.75
Invoiced to Date ($): $ 710,514.12
Invoiced to Date (%): 99%
Remaining Budget ($): $ 4,805.88
Remaining Budget (%): 0.67%

Budget by Phase:

Phase No. 10
Phase Name: Continued Eng Svcs

Phase Budget: $ 99,700.00
Changes: $ 33,500.00
Changes: $ 40,400.00
Changes: $ 18,720.00
Contract Amount: $ 192,320.00
Previously Invoiced: $ 183,550.57
Current Invoice: $ 4,097.75
Invoiced to Date ($): $ 187,648.32
Invoiced to Date (%): 98%
Remaining Budget ($): $ 4,671.68
Remaining Budget (%): 5%

Comments: Phase 10 - Continued Engineering Services
Construction and coordination meetings with contractors and Township; O&M submittal review; punchlist development and progress review; site observation of construction and consultation with Township regarding same. Meetings to discuss punchlists with contractors.

Effort by Labor Category under Phase 10:

Category Previous Hrs. Current Total Hrs.
Authority Engineer 207.25 4.00 211.25
Senior Engineer 395.25 2.50 397.75
Senior Designer 197.00 3.00 200.00
Project Engineer 164.50 0.00 164.50
Staff Engineer 12.25 1.25 13.50
Associate Engineer 69.00 4.00 73.00
Graduate Engineer 43.75 0.00 43.75
Project Representative/Inspector 2.50 0.00 2.50
Technical Specialist (McAloon) 1018.75 33.50 1052.25
Engineering Technician I 49.00 3.50 52.50
Administrative Assistant I 1.50 0.00 1.50
Totals 2160.75 51.75 2212.50

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

COPY

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/30/2010
Client No: 6604-06M
Invoice No. 84386

Ridley Creek Treatment Plant Upgrades/ Expansion

Fees

Date Description Hours Amount
11/08/2010
RFA
Review memo from Rick Smith regarding proposed settlement with Worth & Company; attend executive session of Authority Board to discuss Worth & Company settlement. 0.90
For Current Services Rendered 0.90 171.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 0.90 $190.00 $171.00

Total Current Charges: 171.00

Balance Due: $171.00

ok RS

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

COPY

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/30/2010
Client No: 6604-08M
Invoice No. 84387

Ridley Creek Treatment Plant - Arbitratrations

Date Description Amount
Previous Balance $1,962.50
11/15/2010 Cost Expense Payment -20.00
11/15/2010 Fee Payment -1,222.50
Total Payments -1,242.50
Balance Due $720.00

ok rs

To ensure proper credit, please write client number on
your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be
charged on balances not paid 60 days after the invoice date.

800-999-1018 • Fax 610-560-7921

RC Plant Exp.

Independence CONSTRUCTION MATERIALS
•Including D.M. Stoltzfus Division•

Remit To:
INDEPENDENCE CONSTRUCTION MATERIALS
PO BOX 347337
PITTSBURGH, PA 15251-4337

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424.7454

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

Invoice Number: 30-00010257
Invoice Date: 05-NOV-10
Customer #: 30575
Project #: 3057510CONT
P.O. #:

Project Name: MATERIAL SUPPLY CONTRACT
Location: Devault Asphalt

Date Ticket Product Desc. Truck # Order Quantity Unit Price Haul Rate Fuel Surcharge AC Adj Item Subtotal
11/02/10 20131790
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.16 $34.25 $0.00 $0.00 $0.46 $352.65
11/02/10 20131817
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.06 $34.25 $0.00 $0.00 $0.46 $349.18
11/02/10 20131833
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.01 $34.25 $0.00 $0.00 $0.46 $347.45
11/02/10 20131838
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.02 $34.25 $0.00 $0.00 $0.46 $347.79
11/02/10 20131866
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.00 $34.25 $0.00 $0.00 $0.46 $347.10
11/02/10 20131867
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.00 $34.25 $0.00 $0.00 $0.46 $347.10
11/02/10 20131871
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 9.98 $34.25 $0.00 $0.00 $0.46 $346.41
11/02/10 20131884
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.01 $34.25 $0.00 $0.00 $0.46 $347.45
11/02/10 20131888
cpu
10-C22 25MM 3-30 V253BR25B EGT007 201010 10.12 $34.25 $0.00 $0.00 $0.46 $351.27

Terms: Net 30 Days
Total Quantity: 90.36

SUBTOTAL: $3,136.40
TAX: $0.00
TOTAL: $3,136.40

OK RS
11/19

1.5% MONTH FINANCE CHARGE ON PAST DUE BALANCE

800-999-1018 • Fax 610-560-7921

Independence CONSTRUCTION MATERIALS
•Including D.M. Stoltzfus Division•

Remit To:
INDEPENDENCE CONSTRUCTION MATERIALS
PO BOX 347337
PITTSBURGH, PA 15251-4337

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

Invoice Number: 30-00010259
Invoice Date: 05-NOV-10
Customer #: 30575
Project #: 3057510CONT
P.O. #:

Project Name: MATERIAL SUPPLY CONTRACT
Location: Devault Asphalt

Date Ticket Product Desc. Truck # Order Quantity Unit Price Haul Rate Fuel Surcharge AC Adj Item Subtotal
11/03/10 20132054
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 9.96 $34.25 $0.00 $0.00 $0.54 $346.51

Terms: Net 30 Days
Total Quantity: 120.81

SUBTOTAL: $4,202.99
TAX: $0.00
TOTAL: $4,202.99

1.5% MONTH FINANCE CHARGE ON PAST DUE BALANCE

800-999-1018 • Fax 610-560-7921

RC Plant Expansion

Independence CONSTRUCTION MATERIALS
•Including D.M. Stoltzfus Division•

Remit To:
INDEPENDENCE CONSTRUCTION MATERIALS
PO BOX 347337
PITTSBURGH, PA 15251-4337

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424.7454

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

Invoice Number: 30-00010259
Invoice Date: 05-NOV-10
Customer #: 30575
Project #: 3057510CONT
P.O. #:

Project Name: MATERIAL SUPPLY CONTRACT
Location: Devault Asphalt

Date Ticket Product Desc. Truck # Order Quantity Unit Price Haul Rate Fuel Surcharge AC Adj Item Subtotal
11/03/10 20131968
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 9.99 $34.25 $0.00 $0.00 $0.54 $347.55
11/03/10 20131969
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 9.95 $34.25 $0.00 $0.00 $0.54 $346.16
11/03/10 20131972
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 9.96 $34.25 $0.00 $0.00 $0.54 $346.51
11/03/10 20131996
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.05 $34.25 $0.00 $0.00 $0.54 $349.64
11/03/10 20132008
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.07 $34.25 $0.00 $0.00 $0.54 $350.34
11/03/10 20132012
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.21 $34.25 $0.00 $0.00 $0.54 $355.21
11/03/10 20132015
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.13 $34.25 $0.00 $0.00 $0.54 $352.42
11/03/10 20132025
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.08 $34.25 $0.00 $0.00 $0.54 $350.68
11/03/10 20132035
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.19 $34.25 $0.00 $0.00 $0.54 $354.51
11/03/10 20132049
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 9.97 $34.25 $0.00 $0.00 $0.54 $346.86
11/03/10 20132052
cpu
10-C23 25MM 3-30 V253CS5B EGT007 201014 10.25 $34.25 $0.00 $0.00 $0.54 $356.60

1.5% MONTH FINANCE CHARGE ON PAST DUE BALANCE

ok RS
11/19

PowerPro EQUIPMENT - INVOICE

780 EAST MAIN STREET
NEW HOLLAND, PA 17557
(717) 354-4241
FAX (717) 355-2466

820 EAST WASHINGTON STREET
WEST CHESTER, PA 19380
(610) 738-9000
FAX (610) 738-9003

6515 B MEMORIAL ROAD
ALLENTOWN, PA 18106
(610) 395-6499
FAX (610) 395-6692

** COD - CASH/C

DOCUMENT INVOICE CUSTOMER DATE PG
P32515 080067C 10/27/10 1

SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

SHIP TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171

R.C.

BR TRK MAKE MODEL SERIAL NUMBER EQUIPMENT HOURS/METER SLSM CUSTOMER P.O DATE SHIPPED
02 57 RIDLEY CREEK 10/27/10
ORDER SHIP B/O MFR PART NUMBER DESCRIPTION UNIT PRICE AMOUNT
Telephone 610/692-7171
Taken By KS
5 5 CS 75132020 1/2" REBAR 10FT 3.50 17.50
TOTAL PARTS 17.50
NON TAX - GOVT
NT-GOVT
.00

APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07424.7454

ok rs

-=< THANK YOU FOR YOUR BUSINESS >=-
WWW.POWERPROEQUIPMENT.COM

CREDIT AMOUNT TOTAL AMOUNT
17.50

TERMS: A 1 1/2% PER MONTH LATE CHARGE IS ADDED TO THE UNPAID BALANCE ON ACCOUNTS PAST DUE PER TERMS REFERENCED ABOVE. THIS IS AN 18% ANNUAL PERCENTAGE RATE.
PAST DUE ACCOUNTS WILL BE REFERRED FOR COLLECTION AND CUSTOMER IS LIABLE FOR LEGAL COSTS.
ALL CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS INVOICE. THERE IS A 15% RESTOCKING CHARGE AFTER SEVEN (7) DAYS.
STORAGE CHARGE 30 DAYS AFTER NOTIFICATION.

REMIT TO:
POWER PRO NEW HOLLAND
780 EAST MAIN STREET
NEW HOLLAND, PA 17557

We accept all major credit cards

WHITE - CUSTOMER COPY • PINK - REMITTANCE COPY • CANARY - FILE COPY

Authorized Signature: ________________ Date: ________ Pulled By: ________ Checked By: ________

POWER PRO EQUIPMENT - W CHESTR
820 E WASHINGTON STREET
WEST CHESTER PA 19380
PHONE: 610/738-9000
FAX: 610/738-9003

PARTS ORDER

Customer: 080067C
Document: P32515
Pg: 1
** COD - CASH/CHECK **
10/26/10 9:13

Sold To:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171

Ship To:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
610/692-7171

Br Trk Make Model Serial Equipment Meter Sls Customer P.O.
002 57 RIDLEY CREEK
Ordr Ship B/O Description Each Amount
Taken By KS Ordered 10/26/10
5 5 CS 75132020 1/2" REB CS7513* 3.50 17.50
NON TAX - GOVT .00
NT-GOVT

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07

Steps at Ridley

{{{--- THANK YOU FOR YOUR BUSINESS
PLEASE LET US SERVE YOU AGAIN ---}}}

George Thompson
Total: 17.50

Ransome Rental Co., LP

THE CAT RENTAL STORE

1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270

INVOICE

Please Remit to: Ransome Rental Co., LP, P.O. Box 828735, Philadelphia, PA 19182-8735

R.C.

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380

SHIP TO:
CPU IN WEST CHESTER

Invoice Number Invoice Date Customer Number Customer Order No Store Div Salesman Terms Page
K0308701 10-25-10 1268550 30 R 095 2 1
Agreement Number Agreement Date PC LC MC Ship Via Inv Seq No
K03087 10-11-10 10 CPU IN PA LR 361774
Make Model Serial Number Equipment Number Meter Reading Mach Id No
AA D3GXL JMH02478 361.0 HR3002

CUSTOMER CONTACT: MARK
TAX EXEMPTION LICENSE GOVT/PA

1.0 EQUIPMENT RENTAL
CATERPILLAR
TRK TYPE TRACTOR
ID NO: HR3002
FROM 10/11/10 THRU 10/25/10
MODEL D3GXL
SERIAL NO: JMH02478
PIN: *CAT00D3GCJMH02478*
1976.00
1.0 CLEANING CHARGE
1.0 ENVIRO CHARGE 8.00
1.0 CUST

RANSOME RENTS HOURS:
MONDAY - FRIDAY 7:00AM - 5:00PM, CLOSED SATURDAY & SUNDAY. EMERGENCY SERVICE AVAILABLE 24 HOURS/DAY 7 DAYS A WEEK. 1-888-438-RENT (7368).

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424.7454

ok RS

Ransome Rental Co., LP makes no representation of warranty of any kind, nature or description, express or implied, with respect to the equipment's merchantability, or its fitness for any particular purpose. Title to and the right to possesion of the equipment contracted to be sold shall remain vested in the seller until all sums due or to become due from the purchaser whether evidenced by note, book, account or otherwise, shall have been fully paid. TERMS: All Invoices are due and payable upon receipt. A service charge of 1.5% per month (18% per annum) will be posted directly to your monthly statement if payment is not received within terms. Purchaser is hereby notified that Ransome Rental Co., LP has assigned to Nationwide Program Exchange Services Corp., acting in its capacity as a Qualified Intermediary, its rights (including its rights with respect to all money and any trade-ins, but none of its obligations) with respect to the sale of this equipment.

PLEASE PAY THIS AMOUNT 1984.00
AMOUNT CREDITED

CORPORATE OFFICE - BENSALEM, PA - (215) 639-4300

Ransome Rental Co., LP

RENTAL AGREEMENT

THE CAT RENTAL STORE

1420 Phoenixville Pike, West Chester, Pa 19380 (610) 640-9001 FAX (610) 644-5270

Lessee Bill To
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380

Ship To
CPU IN WEST CHESTER

Invoice Number Invoice Date Customer Number Customer Order No Store Div Salesman Terms Page
10/11/10 1268550 30 R 095 2 1
Agreement Number Agreement Date PC LC MC Ship Via Inv Seq No
K03087 10/11/10 10 CPU IN PA
Make Model Serial Number Equipment Number Meter Reading Mach Id No
AA D3GXL 0JMH02478 360.0 HR3002

CUSTOMER CONTACT: MARK
PHONE: 610 692 7171

ITEM QTY RENTAL RATE PERIOD MKT VAL
IDNO: HR3002 MODEL: D3GXL
SERIAL NUMBER: 0JMH02478
PIN: *CAT00D3GCJMH02478*
DESC: TRK TYPE TRACTOR
TIME OUT: 11:00 DATE OUT: 10/11/10
METER OUT: 360.0
1.0 4 WEEK
WEEK
DAY
70,000.00
EXPECTED RETURN DATE: 10/18/10
SHIP VIA: CPU IN PA

MISCELLANEOUS CHARGES

CLEANING CHARGE 1 40.00
ENVIRO CHARGE 1 8.00
CUST 1 .00

RE-FUEL CHARGE PER GALLON: $6.00
NON-RETURNED KEY CHARGE: $10.00
****PLEASE READ ALL OPERATOR SAFETY MANUALS****
PLEASE CALL TO RELEASE EQUIPMENT WHEN FINISHED
TOLL FREE 1-888-438-RENT (7368)
DAY=8 HOURS, WEEK=40 HOURS, 4 WEEK=160 HOURS

CLEANING CHARGE: NONE _____ STANDARD _____ HEAVY _____

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424 -

Prep sub grade

Delivery Date Time Pick Up Date Time
Delivery Condition Return Condition
Hour Meter Fuel Out Hour Meter Fuel In
Sheet Metal Sheet Metal
Tires Tires
Attach/Misc. Attach/Misc.
Accepted & Received By Renter Date Customer Return Signature Date
Please Print Name SEE TERMS ON BACK

RENTERS/LESSEE RESPONSIBILITIES: Renter/Lessee must check & maintain all fluid levels and lubricating points (engine oil, water, hydraulic oil, fuel, battery, greasing pins, etc.) DAILY. TIRE DAMAGE: Excessive wear, tire repair, and any damage to rented machine are renter's responsibility. Machine to be returned in reasonable clean condition. Minimum cleaning charge of $100 will be assessed if returned dirty. Renter will be charged for refueling. Daily inspect unit for damage, leaks, etc. and report problems immediately to Ransome Rents. The equipment described above has been received in good repair and operating condition.

FIRE/THEFT/VANDALISM
FTV (FIRE/THEFT/VANDALISM WAIVER) will be charged at 14% of the rental amount. This damage waiver covers theft, fire and vandalism only. You remain responsible for physical damage or injury. Fire/Theft/Vandalism waiver (FTV) is not insurance.
** Not available on Heavy Equipment Rentals. **

Ransome Rental Co., LP offers training on all rental equipment. TRAINING DECLINED (Please Initial) ________

CUSTOMER DELIVERY

Martin LIMESTONE

MARTIN LIMESTONE, INC.

SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354.1300 • Fax (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS

-- INVOICE --

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830

AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.

TERMS: NET 30 DAYS
INVOICE NUMBER: 302737

INVOICE DATE CUST. ACCT. NO. CUST. JOB NO. CUST. P.O. NO. ZONE
10/18/10 016716 002 7

JOB NAME: 2010 PRICING/TWP BUILDING
PLANT: 01 WEAVERLAND

DATE SHIPPED TICKET NO. QUANTITY UM PRICE DESCRIPTION AMOUNT
10/15/10 A053352 23.88 TN 12.410 2A 21.66 296.35 RC
10/15/10 A053359 23.76 TN 12.410 2A 21.55 294.86

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 1454 7350 294.86

1 Load To R/C plant
(to paid by MA construction)

1 Load to Line Rd
For PATH WAY

ok RS

[X] TAX EXEMPT TOTAL TONS: 47.64 TOTAL SALE: 591.21 TRUCK CHARGES: .00 SALES TAX: .00
TOTAL 591.21

EAST GOSHEN TOWNSHIP

ACCOUNT DATE INVOICE NO. AMOUNT
016716 002 10/18/10 302737 591.21

PAY BY: M160

MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT

Martin LIMESTONE

Martin Limestone, Inc.

Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202

PLANT: 01 WEAVERLAND
Phone: 717-354-1370

ORDER NO. TICKET NUMBER SCALE AUTO/MANUAL DATE TIME
1001070010 0101A053352 1 A 10/15/2010 07:01 AM

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER, PA 19830

CUSTOMER: 016716
PHONE: 610-692-7171
PO:

SHIP TO:
QUOTE: 1001040002
STATE:
ZONE: 7

PRODUCT ID PRODUCT DESCRIPTION
11 - 421 2A [ ] EXTRA CHARGE, PLOWED/NOT WORKED
[ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE

JOB NAME / LOCATION: 2010 PRICING/TWP BUILDING WEST CHESTER
JOB:
ITEM:

TAG NO. AXLES TRUCK CARRIER NAME CARRIER CODE
PA 4 RA20 ARTERS TRUCKING 525
PICK-UP FREIGHT PPD FREIGHT COLLECT ACCUMULATIVE QUANTITIES PAYMENT METHOD: BILLABLE
XX ORDERED 500.00 MATERIAL:
U.S. WEIGHT
72,520
METRIC WEIGHT GROSS TODAY: 23.88 LOADS: 1 HAUL:
24,760 TARE TO DATE: 96.40 LOADS: 4 ADD'L CHARGES:
47,760 NET ACCUMULATED CASH SALE TAX:
23.88 TN TOTAL THIS LOAD:

WEIGHED BY: CYNTHIA M KOCHEL 016049

INSPECTOR'S SIGNATURE: ________________
JOB ARRIVAL TIME: ________ JOB DEPARTURE TIME: ________

RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [signature]

A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.

322 east, 30 east, 100 south, 202 south to paoli pike exit, left on paoli pike, cross boot rd to twp bldg on right. **ASK FOR MARK-- 610-656-2742.****

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-7454
Sub grade at Plant

YOUR BUSINESS IS GREATLY APPRECIATED.
01-0101A053352 *
CUSTOMER'S COPY

Martin LIMESTONE

MARTIN LIMESTONE, INC.

SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • Blue Ball, PA 17506
TEL (717) 354.1300 • Fax (814) 766.0202 • WWW.MARTINLIMESTONE.COM
New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS

-- INVOICE --

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830

AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.

TERMS: NET 30 DAYS
INVOICE NUMBER: 302735

INVOICE DATE CUST. ACCT. NO. CUST. JOB NO. CUST. P.O. NO. ZONE
10/18/10 016716 7

JOB NAME: 1751 TOWN DRIVE
PLANT: 01 WEAVERLAND

DATE SHIPPED TICKET NO. QUANTITY UM PRICE DESCRIPTION AMOUNT
10/15/10 A053371 24.16 TN 12.410 2A 21.92 299.83 RC
10/15/10 A053386 24.19 TN 12.410 2A 21.94 300.20

APPROVED BY: Mse
DATE PAID: ________
CHECK #: ________
CHARGED TO: 01454-7350
Trail Line Rd.

ok RS

[X] TAX EXEMPT TOTAL TONS: 48.35 TOTAL SALE: 600.03 TRUCK CHARGES: .00 SALES TAX: .00
TOTAL 300.20 600.03

EAST GOSHEN TOWNSHIP

ACCOUNT DATE INVOICENO. AMOUNT
016716 10/18/10 302735 300.20 600.03

PAY BY: M160

MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT

Martin LIMESTONE

Martin Limestone, Inc.

Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202

PLANT: 01 WEAVERLAND
Phone: 717-354-1370

ORDER NO. TICKET NUMBER SCALE AUTO/MANUAL DATE TIME
1007160020 0101A053371 1 A 10/15/2010 09:43 AM

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER, PA 19830

CUSTOMER: 016716
PHONE: 610-692-7171
PO:

SHIP TO:
QUOTE: 1001040002
STATE:
ZONE: 7

PRODUCT ID PRODUCT DESCRIPTION
11 - 421 2A [ ] EXTRA CHARGE, PLOWED/NOT WORKED
[ ] EXTRA CHARGE, LESS THAN 1 TON/ACRE

JOB NAME / LOCATION: 1751 TOWN DRIVE WEST CHESTER
JOB:
ITEM:

JOB REQUIRED NUMBERS

TAG NO. AXLES TRUCK CARRIER NAME CARRIER CODE
NA 4 MM689 PAUL M. MARTIN TRUCKING, LLC 689
PICK-UP FREIGHT PPD FREIGHT COLLECT ACCUMULATIVE QUANTITIES PAYMENT METHOD: BILLABLE
XX ORDERED 200.00 MATERIAL:
U.S. WEIGHT
72,980
METRIC WEIGHT GROSS TODAY: 24.16 LOADS: 1 HAUL:
24,660 TARE TO DATE: 121.36 LOADS: 5 ADD'L CHARGES:
48,320 NET ACCUMULATED CASH SALE TAX:
24.16 TN TOTAL THIS LOAD:

WEIGHED BY: CYNTHIA M KOCHEL 016049

INSPECTOR'S SIGNATURE: ________________
JOB ARRIVAL TIME: ________ JOB DEPARTURE TIME: ________

RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [signature]

A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.

322 east, 30 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left. *** Back In Drive *** mark 610-656-2742.

APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424-
R/C Plant

YOUR BUSINESS IS GREATLY APPRECIATED.
01-0101A053371 *
CUSTOMER'S COPY

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street Suite 100
P.O. Box 562
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
10/31/2010
Client No: 6604-08M
Invoice No. 84078

Ridley Creek Treatment Plant Upgrade/Expansion;

Fees

Date Description Hours Amount
10/07/2010
RFA
Conference with Steve McDonnell to review Clinger claim and Authority audited response. 0.50 87.50
SRM Preparation of summary. 1.00 175.00
10/11/2010
SRM
Review of materials from Brickhouse. 0.60 105.00
SRM Preparation for meeting with East Goshen. 0.40 70.00
SRM Attend meeting with client. 1.50 262.50
For Current Services Rendered 4.00 700.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 0.50 $175.00 $87.50
Stephen R. McDonnell 3.50 175.00 612.50

Expenses

Photocopies 20.00
Total Expenses Thru 10/31/2010 20.00
Previous Balance Pd $1,242.50
Total Current Charges 720.00
Balance Due $1,962.50

ok RS

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

SILVI CONCRETE OF DOWNINGTOWN, LLC.

355 Newbold Road
Fairless Hills, PA 19030
215 295-0777
FAX: 215-295-0630

INVOICE

APPROVED BY: [signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07424 7454

Invoice Date: 10/21/2010
Customer No. EAST0506
Invoice Number: 2122141
Page 1
Job Id: RIDLEY CR SEWER
Credit Terms: MTH END FWLING

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

Date Ticket Qty Description Price Taxbl Amt Exmpt Amt
10/21/10 874522 5.00 3500 AE 59.50 297.50
10/21/10 874522 1.00 FLAT RATE CHARGE - PA 220.00 220.00
10/21/10 874522 5.00 FIBER AD 1LB PER YD 8.90 44.50
10/21/10 874522 1.00 WAITING TIME 25.00 25.00

ok RS
11/9

Total CUBIC YARDS 5.00

A FINANCE CHARGE OF 1.5% WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE CHARGED ON ALL INVOICES NOT PAID BY THE END OF THE NEXT SUCCEEDING CALENDAR MONTH FROM THE DATE OF THE INVOICE

Sub-Total 587.00
Non-Tax Total 0.00
Sales Tax- PA 35.22
Invoice Total 622.22

SILVI CONCRETE OF CHESTER COUNTY, LLC
DOWNINGTOWN PLANT
MAIN OFFICE • MAILING ADDRESS
355 NEWBOLD ROAD, FAIRLESS HILLS, PA 19030
(215) 295-0777 www.silvi.com
FOR CONCRETE DELIVERIES: 1-800-426-6273

74096

ANY AND ALL WARRANTIES SHALL BE VOIDED WHEN EXTERIOR CONCRETE IS NOT PLACED IN ACCORDANCE WITH ACI318 WHICH REQUIRES A MINIMUM OF 4000 PSI AIR ENTRAINED CONCRETE THAT IS PROPERLY CURED AND SEALED.
CONTACT BETWEEN DEICING SALTS AND CONCRETE CAUSES SURFACE DETERIORATION.
PURCHASER MUST PROVIDE AN AREA FOR TRUCKS TO WASH DOWN CHUTE AFTER DISCHARGE.

CYLINDERS TAKENYES □ NO □
SLUMP TESTYES □ NO □
AIR TESTYES □ NO □
10-1 Load 10-2 Leave Plant 10-3 Arrive Job Site 10-5 Start Discharge 10-6 Finish Disch. 10-9 Leave Job Site 10-10 Arrive Plant
8:01 8:08 8:40 8:47 9:31 9:45 10:13

ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS STRENGTH.
ANY WATER ADDED IS AT CUSTOMERS RISK.
WATER ADDED ON JOB AT CUSTOMERS REQUEST _______ GAL.
MATERIALS, WATER ADDED, TRUCK TIMES, TESTS, WARNINGS AND CONDITIONS (SEE BACK) ARE CONFIRMED AND ACCEPTED BY X ________ INITIAL _____

PURCHASER IS RESPONSIBLE FOR ALL DAMAGE BY OR TO SELLER'S TRUCK AFTER LEAVING STREET AND FOR ALL RESULTING LIABILITY, DAMAGE, LOSS OR EXPENSE TO SELLER OR PROPERTY OWNER, INCLUDING TOW TRUCK AND LANDSCAPING CHARGES.
ANY CONCRETE THAT HARDENS IN THE TRUCKS BARREL OR MUST BE DISCHARGED ON THE GROUND TO AVOID HARDENING IN THE BARREL IS THE PURCHASER'S RESPONSIBILITY. ANY CONCRETE THAT HARDENS IN THE FORMS PRIOR TO BEING FINISHED IS ALSO THE PURCHASER'S RESPONSIBILITY.

Plant
1
Ticket No.
874522
Truck
429
Load Size
5.00
Mix
3535, 3500 AE
Slump
5.00
Use Date
10/21/2010
Customer No.
AST0506
Sold To
EAST GOSHEN TOWNSHIP
Tx Cd
0
Driver
METZ, CLIFF
Delivery Address
"slump #FAU
RIDLEY CREEK SEWAGE
P.O. No. Order No.
319556
Instructions
1751 TOURNE DRIVE: 202 EXIT(BOOT ROAD) MAKE A LEFT L PAOLI PIKE GO PAST TOWNSHIP BLDG R 352 L EAST BOOT ROAD R LINE
LOAD QUANTITY CUMULATIVE QUANTITY ORDERED QUANTITY PRODUCT CODE PRODUCT DESCRIPTION UNIT OF MEASURE UNIT PRICE AMOUNT
5.00 5.00 5.00 3535 3500 AE CY 0.00 0.00
1 1 1 FRCP FLAT RATE CHARGE CY 0.00 0.00
5 5 5 1A1 FIBER AD 1LB PER CY 0.00 0.00

MINUTES PER YD. ALLOWED FOR UNLOADING, ADDITIONAL TIME WILL BE BILLED.
FINANCE CHARGE OF 18% APR WILL BE ASSESSED ON ALL MONEY 30 DAYS OR MORE PAST DUE.
COLOR CONSISTENCY OF CONCRETE IS NOT GUARANTEED UNLESS ARCHITECTURAL CONCRETE ORDERED.
FAILURE TO ADEQUATELY CURE CONCRETE VOIDS ALL WARRANTIES.

CONCRETE READY-MIX
HEALTH 2
FLAMMABILITY 0
REACTIVITY 1
PERSONAL PROTECTION X

WARNING! CAUSES IRRITATION
Avoid contact with eyes, skin, and clothing. Wash thoroughly after handling. Exposure may result injury of the skin or eyes from alkali in Portland Cement. Seek medical attention.

SUBTOTAL $0.00
TAX $0.00
TOTAL $0.00

BUYER'S COPY NO. 1

INVOICE

SILVI CONCRETE OF DOWNINGTOWN, LLC.
355 Newbold Road
Fairless Hills, PA 19030
215 295-0777
FAX: 215-295-0830

APPROVED BY: _______________
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: _______________

Invoice Date 10/28/2010
Customer No. EAST0506
Invoice Number 2122221 Page 1
Job Id RIDLEY CR SEWER
Credit Terms MTH END FWLING

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

Date Ticket Qty Description Price Taxbl Amt Exmpt Amt
10/28/10 875483 2.00 3500 AE 59.50 119.00
10/28/10 875483 1.00 FLAT RATE CHARGE - PA 220.00 220.00
10/28/10 875483 2.00 FIBER AD 1LB PER YD 8.90 17.80

ok TRS 11/9

Total CUBIC YARDS 2.00

A FINANCE CHARGE OF 1.5% WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE CHARGED ON ALL INVOICES NOT PAID BY THE END OF THE NEXT SUCCEEDING CALENDAR MONTH FROM THE DATE OF THE INVOICE

Sub-Total 356.80
Non-Tax Total 0.00
Sales Tax- PA 21.41
Invoice Total 378.21

SILVI CONCRETE OF CHESTER COUNTY, LLC
DOWNINGTOWN PLANT
MAIN OFFICE • MAILING ADDRESS
355 NEWBOLD ROAD, FAIRLESS HILLS, PA 19030
(215) 295-0777 www.silvi.com
FOR CONCRETE DELIVERIES: 1-800-426-6273

7543

ANY AND ALL WARRANTIES SHALL BE VOIDED WHEN EXTERIOR CONCRETE IS NOT PLACED IN ACCORDANCE WITH ACI318 WHICH REQUIRES A MINIMUM OF 4000 PSI AIR ENTRAINED CONCRETE THAT IS PROPERLY CURED AND SEALED.
CONTACT BETWEEN DEICING SALTS AND CONCRETE CAUSES SURFACE DETERIORATION.
PURCHASER MUST PROVIDE AN AREA FOR TRUCKS TO WASH DOWN CHUTE AFTER DISCHARGE.

CYLINDERS TAKENYES □ NO ✓
SLUMP TESTYES □ NO ✓
AIR TESTYES □ NO ✓
10-1 Load 10-2 Leave Plant 10-3 Arrive Job Site 10-5 Start Discharge 10-6 Finish Disch. 10-9 Leave Job Site 10-10 Arrive Plant
7:26 7:29 8:11 8:14 8:30 8:42 9:09

ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS STRENGTH.
ANY WATER ADDED IS AT CUSTOMERS RISK.
WATER ADDED ON JOB AT CUSTOMERS REQUEST _______ GAL.
MATERIALS, WATER ADDED, TRUCK TIMES, TESTS, WARNINGS AND CONDITIONS (SEE BACK) ARE CONFIRMED AND ACCEPTED BY X ________ INITIAL _____

PURCHASER IS RESPONSIBLE FOR ALL DAMAGE BY OR TO SELLER'S TRUCK AFTER LEAVING STREET AND FOR ALL RESULTING LIABILITY, DAMAGE, LOSS OR EXPENSE TO SELLER OR PROPERTY OWNER, INCLUDING TOW TRUCK AND LANDSCAPING CHARGES.
ANY CONCRETE THAT HARDENS IN THE TRUCKS BARREL OR MUST BE DISCHARGED ON THE GROUND TO AVOID HARDENING IN THE BARREL IS THE PURCHASER'S RESPONSIBILITY. ANY CONCRETE THAT HARDENS IN THE FORMS PRIOR TO BEING FINISHED IS ALSO THE PURCHASER'S RESPONSIBILITY.

Plant
1
Ticket No.
875483
Truck
102
Load Size
2.00
Mix
3535, 3500 AE
Slump
5.00
Use Date
10/28/2010
Customer No.
AST0506
Sold To
EAST GOSHEN TOWNSHIP
Tx Cd
0
Driver
FALOWSKI, DENNIS
Delivery Address
TAl*RIDLEY CREEK SEWAGE PLANT
P.O. No. Order No.
320001
Instructions
1751 TOURNE DRIVE: 202 EXIT(BOOT ROAD) MAKE A LEFT L PAOLI PIKE GO PAST TOWNSHIP BLDG R 352 L EAST BOOT ROAD R LINE
LOAD QUANTITY CUMULATIVE QUANTITY ORDERED QUANTITY PRODUCT CODE PRODUCT DESCRIPTION UNIT OF MEASURE UNIT PRICE AMOUNT
2.00 2.00 2.00 3535 3500 AE CY 0.00 0.00
1 1 1 FRCP FLAT RATE CHARGE CY 0.00 0.00
2 2 2 1A1 FIBER AD 1LB PER CY 0.00 0.00

MINUTES PER YD. ALLOWED FOR UNLOADING, ADDITIONAL TIME WILL BE BILLED.
FINANCE CHARGE OF 18% APR WILL BE ASSESSED ON ALL MONEY 30 DAYS OR MORE PAST DUE.
COLOR CONSISTENCY OF CONCRETE IS NOT GUARANTEED UNLESS ARCHITECTURAL CONCRETE ORDERED.
FAILURE TO ADEQUATELY CURE CONCRETE VOIDS ALL WARRANTIES.

CONCRETE READY-MIX
HEALTH 2
FLAMMABILITY 0
REACTIVITY 1
PERSONAL PROTECTION X

WARNING! CAUSES IRRITATION
Avoid contact with eyes, skin, and clothing. Wash thoroughly after handling. Exposure may result injury of the skin or eyes from alkali in Portland Cement. Seek medical attention.

SUBTOTAL $0.00
TAX $0.00 ok
TOTAL $0.00

BUYER'S COPY NO. 1

SILVI CONCRETE OF DOWNINGTOWN, LLC. - INVOICE

355 Newbold Road
Fairless Hills, PA 19030
215 295-0777
FAX: 215-295-0630

APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: ___________________

Invoice Date: 10/18/2010
Customer No.: EAST0506
Invoice Number: 2122144 Page 1
Job Id: RIDLEY CR SEWER
Credit Terms: MTH END FWLING

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380

Date Ticket Qty Description Price Taxbl Amt Exmpt Amt
10/18/10 873954 4.00 3500 AE 59.50 238.00
10/18/10 873954 1.00 TEST CYLINDERS 2.50 2.50
10/18/10 873954 1.00 FLAT RATE CHA 220.00
10/18/10 873954 4.00 FIBER AD 1LB B 35.60
10/18/10 873954 1.00 WAITING TIME 25.00

Ridley Creek Exp.
Construction Acct.
These 3 invoices were paid in November (per Rick) to be approved in December.

R/C
New Sidew
ok rs 11/9

Total CUBIC YARDS 4.00

A FINANCE CHARGE OF 1.5% WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE CHARGED ON ALL INVOICES NOT PAID BY THE END OF THE NEXT SUCCEEDING CALENDAR MONTH FROM THE DATE OF THE INVOICE

Item Amount
Sub-Total 521.10
Non-Tax Total 0.00
Sales Tax- PA 31.27
Invoice Total 552.37

SILVI CONCRETE OF CHESTER COUNTY, LLC
DOWNINGTOWN PLANT
MAIN OFFICE • MAILING ADDRESS
355 NEWBOLD ROAD, FAIRLESS HILLS, PA 19030
(215) 295-0777 www.silvi.com
FOR CONCRETE DELIVERIES: 1-800-426-6273

73988

ANY AND ALL WARRANTIES SHALL BE VOIDED WHEN EXTERIOR CONCRETE IS NOT PLACED IN ACCORDANCE WITH ACI318 WHICH REQUIRES A MINIMUM OF 4000 PSI AIR ENTRAINED CONCRETE THAT IS PROPERLY CURED AND SEALED.
CONTACT BETWEEN DEICING SALTS AND CONCRETE CAUSES SURFACE DETERIORATION.
PURCHASER MUST PROVIDE AN AREA FOR TRUCKS TO WASH DOWN CHUTE AFTER DISCHARGE.

CYLINDERS TAKENYES □ NO □
SLUMP TESTYES □ NO □
AIR TESTYES □ NO □
10-1 Load 10-2 Leave Plant 10-3 Arrive Job Site 10-5 Start Discharge 10-6 Finish Disch. 10-9 Leave Job Site 10-10 Arrive Plant
: 8:39 9:09 9:17 9:50 10:02 10:24

ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS STRENGTH.
ANY WATER ADDED IS AT CUSTOMERS RISK.
WATER ADDED ON JOB AT CUSTOMERS REQUEST _______ GAL.
MATERIALS, WATER ADDED, TRUCK TIMES, TESTS, WARNINGS AND CONDITIONS (SEE BACK) ARE CONFIRMED AND ACCEPTED BY X ________ INITIAL _____

PURCHASER IS RESPONSIBLE FOR ALL DAMAGE BY OR TO SELLER'S TRUCK AFTER LEAVING STREET AND FOR ALL RESULTING LIABILITY, DAMAGE, LOSS OR EXPENSE TO SELLER OR PROPERTY OWNER, INCLUDING TOW TRUCK AND LANDSCAPING CHARGES.
ANY CONCRETE THAT HARDENS IN THE TRUCKS BARREL OR MUST BE DISCHARGED ON THE GROUND TO AVOID HARDENING IN THE BARREL IS THE PURCHASER'S RESPONSIBILITY. ANY CONCRETE THAT HARDENS IN THE FORMS PRIOR TO BEING FINISHED IS ALSO THE PURCHASER'S RESPONSIBILITY.

Plant
1
Ticket No.
873954
Truck
409
Load Size
4.00
Mix
3535, 3500 AE
Slump
5.00
Use Date
10/18/2010
Customer No.
AST0506
Sold To
EAST GOSHEN TOWNSHIP
Tx Cd
0
Driver
HOLMES, OLLIE
Delivery Address
TEST CYL*FAK RIDLEY CREEK SEWER
P.O. No. Order No.
319323
Instructions
1751 TOURNE DRIVE: 202 EXIT(BOOT ROAD) MAKE A LEFT L PAOLI PIKE GO PAST TOWNSHIP BLGD R-352 L-EAST BOOT ROAD R-LINE
LOAD QUANTITY CUMULATIVE QUANTITY ORDERED QUANTITY PRODUCT CODE PRODUCT DESCRIPTION UNIT OF MEASURE UNIT PRICE AMOUNT
4.00 4.00 4.00 3535 3500 AE CY 0.00 0.00
1 1 1 FRCP FLAT RATE CHARGE CY 0.00 0.00
1 1 1 TC TEST CYLINDERS ea 0.00 0.00
4 4 4 1A1 FIBER AD 1LB PER CY 0.00 0.00

MINUTES PER YD. ALLOWED FOR UNLOADING, ADDITIONAL TIME WILL BE BILLED.
FINANCE CHARGE OF 18% APR WILL BE ASSESSED ON ALL MONEY 30 DAYS OR MORE PAST DUE.
COLOR CONSISTENCY OF CONCRETE IS NOT GUARANTEED UNLESS ARCHITECTURAL CONCRETE ORDERED.
FAILURE TO ADEQUATELY CURE CONCRETE VOIDS ALL WARRANTIES.

CONCRETE READY-MIX
HEALTH 2
FLAMMABILITY 0
REACTIVITY 1
PERSONAL PROTECTION X

WARNING! CAUSES IRRITATION
Avoid contact with eyes, skin, and clothing. Wash thoroughly after handling. Exposure may result injury of the skin or eyes from alkali in Portland Cement. Seek medical attention.

SUBTOTAL $0.00
TAX $0.00
TOTAL $0.00

BUYER'S COPY NO. 1

Martin LIMESTONE

MARTIN LIMESTONE, INC.
SUBSIDIARY OF NEW ENTERPRISE STONE & LIME CO., INC.
QUARRY DIVISION • NEW HOLLAND CONCRETE • BURKHOLDER PAVING • CONSTRUCTION SUPPLY CENTERS
PO Box 550 • BLUE BALL, PA 17506
TEL (717) 354.1300 • FAX (814) 766.0202 • WWW.MARTINLIMESTONE.COM

New Holland CONCRETE • Burkholder Paving • CONSTRUCTION SUPPLY CENTERS OF NEW HOLLAND CONCRETE

APPROVED BY: _______________
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: _______________

-- INVOICE --

SOLD TO: EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER PA 19830
AFTER 30 DAYS FROM DATE OF INVOICE, SERVICE OR FINANCE CHARGES WILL BE COMPUTED AND CHARGED TO THE ACCOUNT BY APPLYING 1 1/2 % PER MONTH ON THE UNPAID BALANCE, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% PER YEAR.
TERMS: NET 30 DAYS INVOICE NUMBER 303385
INVOICE DATE
10/25/10
CUST. ACCT. NO.
016716
CUST. JOB NO. CUST. P.O. NO. ZONE
7
JOB NAME
1751 TOWN DRIVE-SEWER PLANT
PLANT
01 WEAVERLAND
DATE SHIPPED TICKET NO. QUANTITY UM PRICE DESCRIPTION AMOUNT
10/18/10 A053490 23.84 TN 12.410 2A 21.63 295.85
10/20/10 A053703 23.99 TN 12.410 2A 21.76 297.72

OK TRS 11/9
1 of 3

[X] TAX EXEMPT TOTAL TONS
47.83
TOTAL SALE
593.57
TRUCK CHARGES
.00
SALES TAX
.00
TOTAL 593.57
EAST GOSHEN TOWNSHIP ACCOUNT
016716
DATE
10/25/10
INVOICE NO.
303385
AMOUNT
593.57
PAY BY M164

MAKE CHECKS PAYABLE TO MARTIN LIMESTONE, INC.
PLEASE RETURN THIS STUB WITH YOUR PAYMENT TO INSURE PROPER CREDIT TO YOUR ACCOUNT

Martin LIMESTONE

Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202

PLANT 01 WEAVERLAND Phone: 717-354-1370

ORDER NO.
1007160020
TICKET NUMBER
0101A053703
SCALE
1
AUTO/MANUAL
A
DATE
10/20/2010
TIME
10:53 AM
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER, PA 19830
CUSTOMER 016716
PHONE 610-692-7171
PO
SHIP TO QUOTE 1001040002
STATE
ZONE 7
PRODUCT ID
11 - 421
PRODUCT DESCRIPTION
2A
□ EXTRA CHARGE, PLOWED/NOT WORKED
□ EXTRA CHARGE, LESS THAN 1 TON/ACRE
JOB NAME / LOCATION
1751 TOWN DRIVE-SEWER PLANT WEST CHESTER
JOB ITEM
JOB REQUIRED NUMBERS
TAG NO.
NA
AXLES
4
TRUCK
HH699
CARRIER NAME
PAUL M. MARTIN TRUCKING, LLC
CARRIER CODE
699
PICK-UP FREIGHT PPD
XX
FREIGHT COLLECT ACCUMULATIVE QUANTITIES PAYMENT METHOD
BILLABLE
U.S. WEIGHT
73,020
METRIC WEIGHT ORDERED
200.00
MATERIAL
25,040 GROSS
TODAY 23.99
LOADS 1
HAUL
47,980 TARE
TO DATE 193.38
LOADS 8
ADD'L CHARGES
23.99 TN NET
ACCUMULATED CASH SALE
TAX
WEIGHED BY
CYNTHIA M KOCHEL
016049 TOTAL THIS LOAD ▸
INSPECTOR'S SIGNATURE JOB ARRIVAL TIME JOB DEPARTURE TIME
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [Signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.

322 east, 50 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left.
*** Back In Drive ***
mark 610-656-2742.

ok TRS 11/9
2 of 3

APPROVED BY: M[illegible]
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: 07424 7454 Paving Lot

YOUR BUSINESS IS GREATLY APPRECIATED.

CUSTOMER'S COPY

01-0101A053703 *

Martin LIMESTONE

Martin Limestone, Inc.
Subsidiary of New Enterprise Stone & Lime Co., Inc.
PO Box 550
Blue Ball, PA 17506
Phone: (717) 354-1300 Fax: (814) 766-0202

PLANT 01 WEAVERLAND Phone: 717-354-1370

ORDER NO.
1007160020
TICKET NUMBER
0101A053490
SCALE
1
AUTO/MANUAL
A
DATE
10/18/2010
TIME
01:20 PM
SOLD TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PK
WEST CHESTER, PA 19830
CUSTOMER 016716
PHONE 610-692-7171
PO
SHIP TO QUOTE 1001040002
STATE
ZONE 7
PRODUCT ID
11 - 421
PRODUCT DESCRIPTION
2A
□ EXTRA CHARGE, PLOWED/NOT WORKED
□ EXTRA CHARGE, LESS THAN 1 TON/ACRE
JOB NAME / LOCATION
1751 TOWN DRIVE WEST CHESTER
JOB ITEM
JOB REQUIRED NUMBERS
TAG NO.
NA
AXLES
4
TRUCK
HH619
CARRIER NAME
NEAL M MARTIN
CARRIER CODE
619
PICK-UP FREIGHT PPD
XX
FREIGHT COLLECT ACCUMULATIVE QUANTITIES PAYMENT METHOD
BILLABLE
U.S. WEIGHT
72,560
METRIC WEIGHT ORDERED
200.00
MATERIAL
24,880 GROSS
TODAY 23.84
LOADS 1
HAUL
47,680 TARE
TO DATE 169.39
LOADS 7
ADD'L CHARGES
23.84 TN NET
ACCUMULATED CASH SALE
TAX
WEIGHED BY
CYNTHIA M KOCHEL
016049 TOTAL THIS LOAD ▸
INSPECTOR'S SIGNATURE JOB ARRIVAL TIME JOB DEPARTURE TIME
RECEIVED ABOVE MATERIAL IN GOOD CONDITION
X [Signature]
A SERVICE CHARGE NOT TO EXCEED THE MAXIMUM ALLOWABLE BY LAW WILL BE APPLIED TO ALL AMOUNTS OVER 30 DAYS PAST DUE.

322 east, 30 east, 100 south, 202 south, left on paoli pike, right on line rd, through 4 way stop, 1st right on town drive, # 1751 on left.
*** Back In Drive ***
mark 610-656-2742.

3 of 3

APPROVED BY: [Signature]
DATE PAID: _______________
CHECK #: _______________
CHARGED TO: 01454 7350
07424 7454

YOUR BUSINESS IS GREATLY APPRECIATED.

CUSTOMER'S COPY

01-0101A053490 *

5 - 3.379

ZONE
0
ACCOUNT NO.
000531
DATE
11-2-10
DRIVER
Kevin
TRUCK I.D.
14
NEXT DELIVERY
300
TYPE
60
KIND
15
PHONE NO.
692-7171
.00000 TANK SIZE
2500
LOC.
OPTIMUM 0

WE RESERVE THE RIGHT TO MAKE A FINANCE CHARGE COMPUTED BY A "PERIODIC RATE OF 1.5% PER MONTH WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% ON AMOUNTS PAST DUE 30 DAYS OR MORE AND TO ADD ALL COLLECTION FEES.

Ridley Pump Station
Back-up Generators

31109

Reilly & Sons, Inc.
601 E. LINCOLN HIGHWAY
P.O. BOX 183, EXTON, PA 19341
(610) 363-7225
A FAMILY OWNED BUSINESS SINCE 1976

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6199

#2 ULSD, 15 PPM, ON ROAD DIESEL
A/G TANK, IN PARKING LOT
FEDERAL & STATE TAX EXEMPT
INVOICE-MAILBOX BK OF GARAGE

[VISA] [MasterCard]
THIS IS YOUR INVOICE PAYABLE IN 10 DAYS

(HEATING OIL) DYED LSD 500 PPM MAX, NON-ROAD/TAX-EXEMPT
(DYED OFF-RD DIESEL) NOT FOR USE IN 2007 AND LATER VEHICLES/ENGINES

DATE11/02/10TIME13:03
TRUCK NUMBER14
DRIVER NUMBER1
SALES NUMBER17582
GALLONS START.0
GALLONS FINISH333.0
PRICE/GALLON3.3790
PRODUCT COST1125.21
DYED 15 ULSD
TAX EXEMPT
TOTAL COST1125.21

ok TRS

Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 8, 2010

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday November 8, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: Jack Yahraes, Fran Beck, Dana Pizarro, and Joseph McCawley. Also in attendance were: Rick Smith, Township Manager; Mark Miller, Director of Public Works; Scott Fowler from Brickhouse Environmental; Dan Barbato from Pennoni; and Bob Adams, Authority Solicitor;

COMMON ACRONYMS:

MA- Municipal Authority
HC – Historical Commission
PC – Planning Commission
CB – Conservancy Board
PR – Park & Recreation Board
BOS – Board of Supervisors
SSO – Sanitary System Overflow
I&I – Inflow & Infiltration
RCSTP – Ridley Creek Sewer Treatment Plant
LCSTP – Lochwood Chase Sewer Treatment Plant
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
NPDES – National Pollutant Discharge Elimination System
WAS – Waste Activated Sludge

1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the Pledge of Allegiance. There was a moment of silence to remember our Armed Forces.

At 7:05 pm Fran moved to go into Executive Session. Joe seconded the motion. The motion passed unanimously. The Executive Session ended at 7:15 pm and the regular meeting started.

2. RCSTP REPORTS

A. Brickhouse Report

Scott reported that all four (4) Phases of the Ridley Creek Sewage Treatment Plant Upgrade and expansion were completed during October 2010. The Authority's Engineer accepted substantial completion dates for Wm. Clinger Corporation and Worth & Company as September 17, 2010 and October 21, 2010 respectively.

The Authority's Engineer issued "punch lists" to the contractors on October 14, 2010. Both Contractors have worked towards resolving the issues to achieve final project completion. Completion of the punch list work is anticipated on or before November 30, 2010.

EGTMA Staff installed base paving within the facility perimeter with plans for final paving during 2011. Concrete pads at the entrance doors for all of the buildings and sidewalks along the existing control building North side were installed by the Township staff. Installation of the new fence along the perimeter of the facility was completed.

The SBR treatment process is achieving the current permit discharge limitations and, sampling for the new permit discharge limitations was initiated the week of October 25, 2010. Review of the final effluent total nitrogen and phosphorus laboratory test results are planned for developing an initial indicator of the plant's performance. Aluminum sulfate chemical feed systems are planned to be placed in service during the week of November 8, 2010 to being lowering the final effluent total phosphorus concentration to 0.5mg/L.

MA Minutes 11/08/2010 1

The Siemens warranty performance testing of the treatment system is scheduled to begin November 29, 2010 with the centrifuge dewatering system testing anticipated for mid December 2010. Implementation of the new NPDES final effluent discharge requirements is planned for first quarter 2011. Prior to implementing the new discharge permit limitations, representatives from PADEP are planned to be invited to visit the facility and review operations.

The SBR power failed. Today some wires were burned. The alarm system did not call out. Clinger is responsible for all electric. The electrical study will cost between $5,000 - $8,000 in case the Municipal Authority has to get a third party to do the study.

B. Pennoni – Dan Barbato, reported the following:

RCSTP Upgrade and Expansion

  • Construction phase services have transitioned to punch list monitoring, review of operations and maintenance submittals, and startup assistance, as well as the continuation of progress meetings with the Contractors and Township, coordination and communication with Birckhouse and the Township, and approval of contractor Payment Requests.
  • A breakdown of effort expended over the past month by Pennoni is provided with the invoice detail under separate cover.
  • Worth & Company and Clinger Corporation are working on punch list completion and outstanding items are expected to be complete by the end of November.
  • Pennoni will complete review of the Operations and Maintenance submittals by the end of November.

I/I Metering Project

  • The Township continues to meter flows at selected locations. Pennoni provided recommendations for meters locations for the next round of data collection, and we will review the data when it is available.

Ridley Creek Consent Order

  • The Semi-Annual Report due on September 30 was prepared and submitted to DEP on September 28 as required by the CO&A. The next report is due to DEP in March of 2011.

LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning

  • These documents were provided to the Township for submittal to DEP. The Township received comments from DEP and we are in the process of addressing. We anticipate completing the responses in early December.

Marydell PS Elimination Planning

  • The draft report sections for the Act 537 Plan Revision are being assembled and a determination will be made in the next week regarding the schedule to finish and submit the report and required notifications.

Wastewater Contract Operations Bid

We are assisting with responses to bidder questions on the RFP.

MA Minutes 11/08/2010 2

Applebrook Comprehensive Groundwater Evaluation

  • Applebrook Golf Course has agreed to fund the Comprehensive Groundwater Evaluation needed to maintain the Water Quality Management Permit which allows for spray irrigation on the golf course. The current NPDES allows for discharge of treated wastewater to the irrigation pond on the golf course, providing water for irrigation. The Evaluation is in progress and we recently received responses to our data request needed to complete the report. We anticipate completing the report in November.

C. Cost Summary – None

D. Change Orders – The outstanding Worth & Company change orders and recommendations from Rick were reviewed with the following results:
March 26, 2010 – Extension due to problems with Seimens and March 26, 2010 – Extension due to Clinger. Joe moved to deny both requests as recommended. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

PCO 12 – Additional steel beam in SBP building - $4,703.27 and PCO 13 – Control Joint Modification in Screen Building - $4,499.12. Fran moved to approve payment of these 2 change orders and back charge half of the cost to Pennoni. Dana seconded the motion and pointed out that Evan previously conceded these costs. There was no further discussion. The motion passed unanimously.

PCO 11, PCO 14, and PCO 18 are on hold until more information is available.

3. RCSTP INVOICES

A. Fran moved to approve payment for the following invoices. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.

a.Gawthrop Greenwood, #82932, 9/20/10$ 1,242.50
b.O'Rourke and Sons, #164372, 10/7/10$ 665.00
c.Charles Blosendki Disposal, 10/18/10$ 2,531.00
d.Power Pro Equipment, #P32279, 10/13/10$ 129.48 Credit
e.Power Pro Equipment, #P32136, 10/5/10$ 2,073.90
f.Power Pro Equipment, #P32515, 10/27/10$ 17.50
g.Martin Limestone, #302736, 10/18/10$ 577.93
h.Martin Limestone, #302737, 10/18/10$ 296.35
i.Martin Limestone, #302735, 10/18/10$ 299.83
j.Vimco, #339422, 10/21/10$ 270.75
k.Ransome Rental Co., #K0312001, 10/20/10$ 608.00
l.Ransome Rental com. #K0308701, 10/25/10$ 1,984.00
m.Yerkes Assoc., #38547, 10/5/10$ 571.88
n.Pennoni, #454783, 10/27/10$ 12,326.15
o.Pennoni, #454693, 10/27/10$ 1,620.00
p.Brickhouse Environmental, #5596, 11/1/10$ 517.50
q.Brickhouse Environmental, #5595, 11/1/10$ 8,826.25

B. After discussion Joe moved to approve payment for the following invoice:
Worth & Co., P28001, 10/31/10 $224.000.00

MA Minutes 11/08/2010 3

Fran seconded the motion. There was no further discussion or comment. The motion passed unanimously.

4. CHAIRMAN'S REPORT

Jack reported that West Goshen is changing their attorney.
He also reported that Mike Steinberger formally resigned from the Municipal Authority effective 12/31/10.

5. APPROVAL OF MINUTES

A. Fran moved to approve the minutes of the October 11, 2010 as corrected. Dana seconded the motion. The motion passed unanimously.

6. ENGINEER'S REPORT – See 2B.

7. APPROVAL OF INVOICES

A. Joe moved to approve payment for the following invoices. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

a.Gawthrop Greenwood, 82931, 9/30/10$ 475.00
b.Pennoni, #454694, 10/27/10$ 603.75
c.Pennoni, #454595, 10/27/10$ 1,548.75
d.Pennoni, #454693, 10/27/10$ 1,620.00
e.Martin Limestone, #302737, 10/18/10$ 294.86

Note: Invoice for Martin Limestone, #302735, 10/18/10, $300.20 was not a Municipal Authority expense.

8. LIAISON REPORTS

A. Jack reported for Megann Hedgecock of the Planning Commission. The applications discussed were AT&T to upgrade their cell tower on Strasburg Road, CTDI to expand parking and Cavalli to construct a detached 2-car garage.

9. FINANCIAL REPORTS

None

10. GOALS

Dana will provide an article by Nov. 11, 2010 for the next Township newsletter.

11. OLD BUSINESS

None

12. NEW BUSINESS

A. Bids to perform the Performance Test were received from four labs. Mark recommended Lancaster. Dana asked him to check if there is a Data Package and which type. Mark will check on this. Dana moved to approve Lancaster Labs for $9,478.00 pending clarification of the Data Package. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

MA Minutes 11/08/2010 4

B. Joe moved to reappoint Gawthrop Greenwood as the Municipal Authority's attorney for 2011 with no change in fees. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

C. Joe moved to continue Brickhouse Environmental as project manager. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

D. Joe moved to approve Maillie, Falconiero & Co. as auditor for 2010 at $7,500.00. Fran seconded the motion. There was no further discussion. The motion passed unanimously.

E. Fran moved to authorize Mark Miller to purchase a stainless steel lift chain for the removal of pumps in the SBRS at a cost of $2,483.00. Joe seconded the motion. There was no further discussion. The motion passed unanimously.

13. CAPACITY REQUESTS

A. None

14. SEWER REPORTS

A. Mark Miller reported the following:

Meters – The meters were read on a daily basis. Meters were calibrated during the month on October. The meter at the Hershey's Mill Pump Station was knocked out of service due to flooding. Allied Control pulled the meter and made repairs and placed back in service.

CC Collection – The Public Works Department responded to several calls for missing caps.

RC Collection – We located significant INI in the line between Paoli Pike and North Chester Road estimated at 20,000 gallons a day. We were able to narrow down the INI by the use of portable meters. We also received odor complaints from the Fair Way Village. The timing on the pumps was changed to alleviate the effluent going septic.

Ridley Creek Plant – The paving of the plant has been completed. Once the staging area is restored, we will then finish paving the driveway.

Complete items for the month – Fencing, seeded and strawed, storm drains/downspouts all piped PWD and side walks & blacktop are done.

15. ANY OTHER MATTER

None

16. CORRESPONDENCE

None

17. PUBLIC COMMENT

None

MA Minutes 11/08/2010 5

18. ADJOURNMENT

There being no further business, Fran moved to adjourn the meeting. Joe seconded the motion. The meeting was adjourned at 8:30 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 11-08-10 Draft.doc

MA Minutes 11/08/2010 6

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | West Chester, PA 19381-0562
(p) 610-696-8225 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

CCI

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page:1
11/30/2010
Client No:6604-01M
Invoice No.84385

General Authority Services

Fees

Hours
11/08/2010
RFA
Review packet for 11/8/10 Authority meeting; attend regular meeting of Municipal Authority. 2.00
For Current Services Rendered 2.00 380.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.00 $190.00 $380.00
Previous Balance $1,254.00
Total Current Charges 380.00
11/16/2010 Fee Payment -1,254.00
Balance Due $380.00

ok RS

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 457260
Invoice Date : 11/23/2010
Project : EGMA1002
Project Name : Applebrook Comp. Groundwater Eval.

For Services Rendered through: 11/07/2010

Visit to Applebrook to locate wells and water contours, review hydrogeology, request data from Client.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,785.00
Expense : 0.00
Phase Total : 1,785.00
Amount Due This Invoice $1,785.00
Fee :5,500.00
Prior Billings :1,548.75
Current Billings :1,785.00
Total Billings :3,333.75

Phase : **** -- Professional Services
Labor

Class Hours/Units Rate Amount
Senior Engineer 17.00 105.00 1,785.00
Labor Total: 17.00 1,785.00
Total Phase : **** -- Professional Services Labor : $1,785.00
Expense : $0.00
Total Project : EGMA1002 -- Applebrook Comp. Groundwater Eval. Labor : $1,785.00
Expense : $0.00

ok TRS

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1002 Invoice Summary.xlsx
Invoice Date 11-23-2010

Project:Applebrook Comp. Groundwater Eval.
Pennoni Job No.:EGMA 1002
Invoice No:457260
Invoice Period:10/18/2010to11/7/2010
Initial Authorization:$ 5,500.00Date:9/20/2010
Changes:$ -Date:
Contract Amount:$ 5,500.00
Previously Invoiced:$ 1,548.75
Current Invoice:$ 1,785.00
Invoiced to Date ($):$ 3,333.75
Invoiced to Date (%):61%
Remaining Budget ($):$ 2,166.25
Remaining Budget (%):39%

Budget by Phase:

Phase No. ****
Phase Name: Applebrook Comp.
Phase Budget:$ 5,500.00
Previously Invoiced:$ 1,548.75
Current Invoice:$ 1,785.00
Invoiced to Date ($):$ 3,333.75
Invoiced to Date (%):61%
Remaining Budget ($):$ 2,166.25
Remaining Budget (%):39%

Comments: Visit to Applebrook to locate wells and water contours, review hydrogeology, request data from Client.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 457259
Invoice Date : 11/23/2010
Project : EGMA1000
Project Name : 2010 Annual Services

For Services Rendered through: 11/07/2010

Preparation of monthly report.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 105.00
Expense : 0.00
Phase Total : 105.00
Amount Due This Invoice $105.00
Fee :13,338.25
Prior Billings :10,942.00
Current Billings :105.00
Total Billings :11,047.00

Phase : **** -- Professional Services
Labor

Class Hours/Units Rate Amount
Authority Engineer 1.00 105.00 105.00
Labor Total: 1.00 105.00
Total Phase : **** -- Professional Services Labor : $105.00
Expense : $0.00
Total Project : EGMA1000 -- 2010 Annual Services Labor : $105.00
Expense : $0.00

ok TRS

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1000 Invoice Summary.xls
Invoice Date 10-27-2010

Project:2010 Annual Services
Pennoni Job No.:EGMA 1000
Invoice No:457259
Invoice Period:10/18/2010to11/7/2010
Initial Authorization:$ 10,338.25Date:1/11/2010
Changes:$ 3,000.00Date:
Contract Amount:$ 13,338.25
Previously Invoiced:$ 10,942.00
Current Invoice:$ 105.00
Invoiced to Date ($):$ 11,047.00
Invoiced to Date (%):83%
Remaining Budget ($):$ 2,291.25
Remaining Budget (%):17%

Budget by Phase:

Phase No. ****
Phase Name: 2010 Annual Services
Phase Budget:$ 13,338.25
Previously Invoiced:$ 10,942.00
Current Invoice:$ 105.00
Invoiced to Date ($):$ 11,047.00
Invoiced to Date (%):83%
Remaining Budget ($):$ 2,291.25
Remaining Budget (%):17%

Comments: Preparation of monthly report.

2010
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
DECEMBER REPORT

ON-GOING

  1. Submit an article for each newsletter. Need by 2/10/10 Fran - Completed; Need by 5/12/10 Jack - Completed; Need by 8/11/10 Joe – Mark - Completed; Need by 11/10/10 Dana
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) Fran - Completed; 2 nd Quarter (June) Dana – Not Completed; 3 rd Quarter (September) Joe - Completed - Attended the August meeting; 4 th Quarter (December) Jack
  3. Respond to capacity requests in 45 days or less. Michael Mirarchi (143 Line Road) request of 1/21/10 granted on 4/12/10). West Pike Township request received on August 6, 2010, MA directed staff to look into on August 9, 2010 - Engineer’s response 12/9/10
  4. Implement I&I Plan. – Completed and Ongoing – March Report filed on time, September Report filed in time, I&I repair work continues.
  5. Conduct a sewer facilities tour after RCSTP construction is complete

RIDLEY CREEK PROJECT

  1. Monitor construction. Substantial Completion October 21, 2010
  2. Invite Board of Supervisors and all other ABC members to tour the plant during the start up period when the SBR unit is running on treated effluent. Completed - SBR Tour conducted on 3/15/10
  3. Invite Board of Supervisors and all other ABC members to a primer educational session on SBR’s. Completed - SBR Class conducted on 3/15/10
  4. Have Siemens conduct a training session for Artesian and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens’ facility in the mid-west.)

ACT 537 PLANNING

  1. Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. BoS adopted Resolution 10-106 on 6/15/2010. Revisions sent to PA DEP on 6/16/10. Received DEP 7/13/10 review letter. Currently working on response.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\121310.doc

  1. Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. BoS adopted resolutions 10-105 and 10-108 on 6/15/10. Revisions sent to PA DEP on 6/16/10. Received DEP 7/14/10 review letter. Currently working on response.
  2. Obtain Act 537 Plan approval for the Marydell PS Abandonment project.
  3. Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project.
  4. Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Obtained agreement on diversion from West Goshen on 5/13/10.

FUNDING

  1. H20 Grant – Obtain funding and use monies ($464,195) to pay for construction at RCSTP. Completed - We have received the money. Used grant money to pay Worth and Clinger August invoices

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2010\121310.doc

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

December 9, 2010

EGMA1000

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: West Pikeland Township Sewer Capacity Request

Dear Mr. Smith:

On August 5, 2010, West Pikeland Township submitted a letter to the East Goshen Municipal Authority requesting the 20,000 gallons per day of sewer capacity on behalf of West Whiteland Township.

The proposal by West Pikeland Township is to divert 20,000 gpd of West Whiteland flow from DARA to the Ridley Creek Sewage Treatment Plant via West Goshen. This would facilitate West Pikeland sending 20,000 gpd to DARA.

We have reviewed this request and in light of the Board’s decision to divert Lochwood Chase to the Ridley Creek Plat, we do not believe that there is adequate infrastructure capacity at this time to accommodate this request. We recommend that the Township decline West Pikeland’s request for sewer capacity.

If you have any questions, please feel free to contact me at (302) 655-4451.

Sincerely,

PENNONI ASSOCIATES INC.

D Barbato
Daniel P. Barbato, P.E.
Authority Engineer

62 Rockford Road • Suite 201 • Wilmington, DE 19806 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

December 8, 2010

EGMA1000

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Fee Schedule for Year 2011 and Annual Services
East Goshen Township Municipal Authority
Chester County, Pennsylvania

Dear Rick;

Pennoni Associates Inc. is proud to serve East Goshen Municipal Authority as a client and we look forward to working with you in 2011. We enjoy the relationships we have formed with the Authority and are grateful to be part of the organization. We respectfully request reappointment as Authority Engineer for 2011.

The proposed rates shown below do not include increases with the exception of the Authority Engineer rate. Our rate of $105 per hour for Authority Engineer has remained unchanged since 2006. We propose a modest increase to the Authority Engineer rate of $5 per hour, which we believe is competitive and is consistent with most of our Clients.

Our rate increases for 2010 were modest and prior to 2010 our rates were frozen for two years. While our company has many employee classifications, these are the classifications most frequently utilized in performing tasks for our municipal clients. We assign the most appropriate level staff competent to perform the work effort requested.

Authority Engineer$110/hr
Senior Engineer$105/hr
Project Engineer$90/hr
Staff Engineer$85/hr
Associate Engineer$80/hr
Graduate Engineer$70/hr
Engineering Technician II$72/hr
Engineering Technician I$65/hr

As part of our responsibilities to the Authority as the Appointed Engineer, we will provide the following professional services to the Authority:

  • Preparation of the Annual Municipal Wasteload Management (Chapter 94) Report to DEP (note that DEP has required that individual reports be prepared for the Ridley Creek STP, Lochwood Chase STP, the West Goshen Service Area, and the Westtown Service Area);
  • Participation in monthly meetings of the Authority Board; and,
  • Consultation on issues on behalf of the Authority

62 Rockford Road • Suite 201 • Wilmington, DE 19806 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

EGMA1000
Rick Smith

December 22, 2009

Page 2
Year 2010 Annual Services

The estimated fee for annual services is $10,000 to be billed on an hourly basis at the above rates.

We look forward to continuing to serve the Authority in 2011. If you have any questions, please feel free to contact me at (302) 655-4451.

Very truly yours,

PENNONI ASSOCIATES INC.

D Barbato
Daniel P. Barbato, P.E.
Authority Engineer

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 8, 2010

To: Municipal Authority

From: Mark Miller

Re: December 2010 Monthly Report

Meter: Meters were calibrated for the last quarter. The Public Works employees read the meters on a daily basis. C.C. Collection: We had three lateral clogs, two were caused by children throwing debris down the clean- out pipe.
All the pumping stations wet wells were cleaned. New floats were installed at the Ashbridge Pump Station . We also had a problem with the transducer. R.C. Collection: The pumping station was visited on a daily basis no problems to report. Lochwood Plant: The plant was visited on a routine basis. Several trees fell in the spray fields. They are scheduled for removal this month. Ridley Creek Plant: Was visited on a daily basis. Routine maintenance was done to the screen. We ordered a new strainer for the utility water line. The floors in the SBR Building were scrubbed and sealed. Pa One Calls: We received 89 PA One calls for the Month of November. Alarms: 27 alarms for the month of November.

f:\data\shared data\public works dept\monthly reports\2010 municipal\2010 municipal authority november report doc..doc

ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers

October 19, 2010

Mr. Mark Miller
Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Ridley Creek Wastewater Treatment Facility
September 2010 Operations Report

Dear Mr. Miller:

The following is the September 2010 monthly operations report for East Goshen Township’s Ridley Creek Wastewater Treatment Facility.

Treatment plant operations were normal during the month of September 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 2,087,800 gallons, which represents an average daily flow of 231,978 gallons per day.

The influent area operated normally during the month. The muffin monster and influent screen were on line continuously. Debris generated by the unit was disposed of via trash bags. The three (3) raw lift pumps operated normally. No problems were noted with the pumps or associated controls. The soda ash feed system was operational throughout the month, although the feed pump and discharge line continues to clog. The Township has assisted the operator in clearing the discharge line and returning the system to service.

The SBR building operated normally during the month. SBR’s #1, #3, & #4 were in service with the mixed liquor being medium brown colored with a moderate amount of tan surface foam buildup. SBR #2 remained off line. The operator continues to optimize the process to improve effluent quality.

The ultraviolet light disinfection system also operated continuously throughout the month with both light banks being utilized. The system was placed into automatic operation with the light banks alternating.

The effluent system operated normally during the month. The house water system was in service continuously and no problems were experienced with the pumps or controls. The inline screens were cleaned on a regular basis to remove solids and debris buildup. The Applebrooke subdivision effluent pump was in service throughout the month of September. In September we sent approximately 43,018 gallons of effluent to the golf course daily for irrigation needs.

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com

Construction work continued during the month on the Phase II part of the project. Work included completion of the DAVCO tankage rehabilitation and start-up, centrifuge operations, and control adjustments.

Results of influent and final effluent samples collected during the month indicate compliance with the existing final effluent permit limitations.

Should you have any questions, please do not hesitate to contact me.

Sincerely,

Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator

C      Mr. Dan Barbato, P.E. – Pennoni Associates

2

ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers

November 5, 2010

Mr. Mark Miller
Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Ridley Creek Wastewater Treatment Facility
October 2010 Operations Report

Dear Mr. Miller:

The following is the October 2010 monthly operations report for East Goshen Township’s Ridley Creek Wastewater Treatment Facility.

Treatment plant operations were normal during the month of October 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 8,895,900 gallons, which represents an average daily flow of 286,965 gallons per day.

One major plant upset did occur on October 1, 2010 when over ten inches of rainfall was received. The SBR’s were not able to handle the large increase in flows and began to overflow. The plant operator made the necessary corrective actions to stop the overflow and allow the flow to pass through the plant. PADEP was notified of the situation and the Sanitary Sewer Overflow report was prepared and submitted. Due to the process upset, final effluent weekly sampling was not completed for the period.

The influent area operated normally during the month. The muffin monster and influent screen were on line continuously. Debris generated by the unit was disposed of via trash bags. The three (3) raw lift pumps operated normally. No problems were noted with the pumps or associated controls. The soda ash feed system continued to experience problems during the month with clogging of the discharge line. The permanent new feed pump and discharge tubing were installed during the month. However, the new pump controls have not been corrected to date so the old feed pump remains in service.

The influent screen also developed operational problems during the month of October. The level control system failed and the unit had to be placed into continuous running mode. One of the level transducers is out of range and will require service repairs.

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com

The SBR building operated normally during the month. SBR’s #1, #3, & #4 were in service with the mixed liquor being medium brown colored with an amount of tan surface foam heavy buildup. SBR #2 remained off line. The disc fillers were online continuously during the month but require almost daily resetting of alarm conditions, which continue to occur. The plant operator continues to make process control adjustments to improve the plant’s performance.

The ultraviolet light disinfection system also operated continuously throughout the month with both light banks being utilized. The system operated in the automatic mode for most of the month until a ballast failed on the #2 bank. The #1 bank was placed back in hand mode to ensure disinfection until the ballast can be changed.

The effluent system operated normally during the month. The house water system was in service continuously and no problems were experienced with the pumps or controls. The inline screens were cleaned on a regular basis to remove solids and debris buildup. The Applebrooke subdivision effluent pump was in service throughout the month of October. In October we sent approximately 51,996 gallons of effluent to the golf course daily for irrigation needs.

Construction work continued during the month on the Phase II part of the project. Work completed during the month included startup of the decant equalization system, sludge holding tanks, filler feed pumps and associated controls, development of a punch list, and control system adjustments.

Results of influent and final effluent samples collected during the month indicate compliance with the existing final effluent permit limitations.

Should you have any questions, please do not hesitate to contact me.

Sincerely,

Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator

C      Mr. Dan Barbato, P.E. – Pennoni Associates

2

ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers

November 5, 2010

Mr. Mark Miller
Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Lockwood Chase Wastewater Treatment Facility
October 2010 Operations Report

Dear Mr. Miller:

The following is the October 2010 monthly operations report for East Goshen Township’s Lockwood Chase Wastewater Treatment Facility.

Treatment plant operations were normal during the month of October 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 294,000 gallons, which represents an average daily flow of 9,484 gallons per day.

The influent area operated normally during the month. The communitor unit was in-service continuously and no problems were noted with the unit or its controls. The plant operator was required to remove debris buildup from the unit’s housing, the bypass bar screen, and grit from the bottom of the influent chamber on a regular basis. Debris was disposed of via the trash can.

The aeration pond operated normally during the month of October. The pond’s color changed to brownish during the month and there was only minor surface scum buildup. Both floating aerators were in service continuously.

The polishing pond operated normally during the month as well. The pond’s color was very green due to algae growth with some moderate buildup of surface duckweed.

The chlorine feed system and chlorine contact tank were operational throughout the month to meet disinfection requirements. Liquid chlorine was added directly to the chlorine contact tank prior to starting the discharge pumps to help minimize odor issues.

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com

The discharge spray system was operational during the month. The discharge pumps were operated in the hand position and alternated for each spray cycle. Spray fields No. 1 through No. 5 were utilized to help minimize odors.

Results of influent, final effluent, and monitoring well samples collected during the month were not available to date, but current permit compliance is expected.

Should you have any questions, please do not hesitate to contact me.

Sincerely,

Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator

C      Mr. Dan Barbato, P.E. – Pennoni Associates

2

ARTESIAN RESOURCES
OVER 100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Pennsylvania
Artesian Water Maryland • Artesian Wastewater Maryland • Artesian Consulting Engineers

December 10, 2010

Mr. Mark Miller
Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Lockwood Chase Wastewater Treatment Facility
November 2010 Operations Report

Dear Mr. Miller:

The following is the November 2010 monthly operations report for East Goshen Township’s Lockwood Chase Wastewater Treatment Facility.

Treatment plant operations were normal during the month of November 2010. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharge during the month was 652,600 gallons, which represents an average daily flow of 22,503 gallons per day.

The influent area operated normally during the month. The communitor unit was in-service continuously and no problems were noted with the unit or its controls. The plant operator was required to remove debris buildup from the unit’s housing, the bypass bar screen, and grit from the bottom of the influent chamber on a regular basis. Debris was disposed of via the trash can.

The aeration pond operated normally during the month of November. The pond’s color changed to brownish during the month and there was only minor surface scum buildup. Both floating aerators were in service continuously.

The polishing pond operated normally during the month as well. The pond’s color was very green due to algae growth with some moderate buildup of surface duckweed.

The chlorine feed system and chlorine contact tank were operational throughout the month to meet disinfection requirements. Liquid chlorine was added directly to the chlorine contact tank prior to starting the discharge pumps to help minimize odor issues.

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Highway, Unit 4, Milton, Delaware 19968
email: artesian@artesianwater.com Website: artesianwater.com

The discharge spray system was operational during the month. The discharge pumps were operated in the hand position and alternated for each spray cycle. Spray fields No. 1 through No. 5 were utilized to help minimize odors.

Results of influent, final effluent, and monitoring well samples collected during the month were not available to date, but current permit compliance is expected.

Should you have any questions, please do not hesitate to contact me.

Sincerely,

Tom Horrex / L.F.
Tom Horrex
Treatment Plant Operator

C      Mr. Dan Barbato, P.E. – Pennoni Associates

2

2008 FLOWMETERS

2010 NOVEMBER 4TH QUARTER

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT GPD NET FLOWS
0.00 11/01/10 1,844,530 1,349,500 16,101,620 140,253 8,770,520 61,643 10,331,894 90,500 20,400 1,057,105
0.00 11/02/10 20,400 0
0.20 11/03/10 20,400 0
1.20 11/04/10 1,847,853 1,107,667 16,134,626 110,020 8,784,942 48,073 10,356,048 80,513 20,400 869,060
0.00 11/05/10 1,849,347 1,494,000 16,152,598 179,720 8,791,794 68,520 10,365,741 96,930 20,400 1,148,830
0.00 11/06/10 20,400 0
0.00 11/07/10 20,400 0
0.00 11/08/10 1,852,866 1,173,000 16,189,862 124,213 8,806,275 48,270 10,383,984 60,810 20,400 939,707
0.00 11/09/10 1,853,980 1,114,000 16,201,188 113,260 8,811,056 47,810 10,391,650 76,660 20,400 876,270
0.00 11/10/10 1,855,083 1,103,000 16,211,996 108,080 8,815,688 46,320 10,398,221 65,710 20,400 880,890
0.00 11/11/10 20,400 0
0.00 11/12/10 20,400 0
0.00 11/13/10 20,400 0
0.00 11/14/10 20,400 0
0.00 11/15/10 1,860,497 1,082,800 16,266,453 108,914 8,837,724 43,672 10,426,368 56,294 20,400 873,920
0.00 11/16/10 1,861,596 1,099,000 16,277,309 108,560 8,842,703 49,790 10,435,200 88,320 20,400 852,330
0.00 11/17/10 1,862,755 1,159,000 16,288,980 116,710 8,848,037 53,340 10,446,887 116,870 20,400 872,080
0.00 11/18/10 1,863,848 1,093,000 16,300,399 114,190 8,853,578 55,410 10,456,265 93,780 20,400 829,620
0.00 11/19/10 1,864,959 1,111,000 16,311,414 110,150 8,858,422 48,440 10,464,502 82,370 20,400 870,040
0.13 11/20/10 20,400 0
0.00 11/21/10 20,400 0
0.00 11/22/10 1,867,889 976,667 16,343,668 107,513 8,870,613 40,637 10,482,022 58,400 20,400 770,117
0.00 11/23/10 1,869,231 1,342,000 16,354,031 103,630 8,875,059 44,460 10,491,302 92,800 20,400 1,101,110
0.00 11/24/10 1,870,370 1,139,000 16,365,178 111,470 8,880,175 51,160 10,500,697 93,950 20,400 882,420
0.00 11/25/10 20,400 0
0.00 11/26/10 20,400 0
0.00 11/27/10 20,400 0
0.00 11/28/10 20,400 0
0.00 11/29/10 1,875,675 1,061,000 16,419,874 109,392 8,897,692 35,034 10,525,657 49,920 20,400 866,654
1.00 11/30/10 20,400 0
20,400
2.53 1,070,342 108,388 45,529 74,222 842,203

DAILY LOC | INQUIRER | EG TWP

MONTH TO DATE
NORMAL MONTH TO DATE
YEAR TO DATE
NORMAL YEAR TO DATE

2007 flowmeters -all-stations separate month worksheets.xls

2008 FLOWMETERS

2010 NOVEMBER 4TH QUARTER

DATE HERSHEY'S MILL READING HERSHEY'S MILL GPD ASHBRIDGE READING ASHBRIDGE GPD HICKS METER READING HICKS METER GPD RESERVOIR READING RESERVOIR GPD SHERMAN READING SHERMAN GPD BARKWAY READING BARKWAY GPD
11/01/10 19,776,976 67,568 949,718 80,500 14,526,644 360,283 107,836,339 848,898 446,773 7,395 1,707,017 14,320
11/02/10
11/03/10
11/04/10 19,792,540 51,880 951,595 62,567 14,620,043 311,330 108,049,712 711,243 448,741 6,560 1,710,286 10,897
11/05/10 19,798,457 59,170 952,616 102,100 14,659,420 393,770 108,143,118 934,060 449,324 5,830 1,711,483 11,970
11/06/10
11/07/10
11/08/10 19,815,899 58,140 954,844 74,267 14,742,150 275,767 108,358,805 718,957 451,276 6,507 1,715,093 12,033
11/09/10 19,821,341 54,420 955,971 112,700 14,774,494 323,440 108,432,002 731,970 451,889 6,130 1,716,203 11,100
11/10/10 19,826,558 52,170 957,131 116,000 14,804,653 301,590 108,502,405 704,030 452,573 6,840 1,717,220 10,170
11/11/10
11/12/10
11/13/10
11/14/10
11/15/10 19,853,490 53,864 959,333 44,040 14,939,616 269,926 108,839,316 673,822 455,675 6,204 1,723,059 11,678
11/16/10 19,858,864 53,740 959,962 62,900 14,971,949 323,330 108,912,110 727,940 456,339 6,640 1,724,150 10,910
11/17/10 19,864,281 54,170 960,619 65,700 15,007,915 359,660 108,989,217 771,070 456,910 5,710 1,725,229 10,790
11/18/10 19,869,830 55,490 961,253 63,400 15,041,246 333,310 109,062,592 733,750 457,556 6,460 1,726,339 11,100
11/19/10 19,875,174 53,440 961,871 61,800 15,072,239 309,930 109,133,580 709,880 458,127 5,710 1,727,417 10,780
11/20/10
11/21/10
11/22/10 19,891,964 55,967 963,951 69,333 15,148,633 254,647 109,295,580 540,000 460,023 6,320 1,731,166 12,497
11/23/10 19,897,031 50,670 964,405 45,400 15,179,831 311,980 109,405,850 1,102,700 460,639 6,160 1,732,200 10,340
11/24/10 19,902,585 55,540 965,103 69,800 15,213,392 335,610 109,479,905 740,550 461,469 8,300 1,733,305 11,050
11/25/10
11/26/10
11/27/10
11/28/10
11/29/10 19,932,901 60,632 968,336 64,660 15,341,086 255,388 109,820,830 681,850 465,118 7,298 1,740,418 14,226
11/30/10
51,286 67,644 290,645 698,788 6,045 10,636

2007 flowmeters -all-stations separate month worksheets.xls

2010 SUMMARY OF METER READINGS

MONTH WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY 1,425,517 123,265 81,325 63,991 20,400 83,711 103,900 363,921 882,367 5,627 13,543
FEBRUARY 1,462,759 132,866 74,793 70,879 20,400 77,500 103,327 332,371 906,362 5,456 13,156
MARCH 1,603,009 170,328 75,607 63,240 20,400 102,840 146,865 404,526 1,071,132 5,071 19,213
APRIL 59,434 174,279 89,043 67,148 20,400 85,455 126,703 386,665 991,262 5,303 13,956
MAY 1,317,648 145,694 87,062 54,671 20,400 63,587 86,855 355,426 836,562 5,802 11,248
JUNE 1,225,309 126,607 78,857 70,230 20,400 57,796 67,285 353,596 802,473 5,804 11,194
JULY 1,106,553 128,794 61,615 108,460 20,400 51,263 61,149 332,264 727,562 4,751 10,465
AUGUST 1,053,504 149,151 61,447 107,885 20,400 47,989 59,434 324,438 683,558 5,412 8,486
SEPTEMBER 1,032,377 125,642 56,133 94,124 20,400 45,339 59,940 357,186 650,049 5,465 10,401
OCTOBER 1,241,095 136,285 49,227 79,650 20,400 33,650 81,895 328,383 781,909 6,397 11,637
NOVEMBER 1,070,342 108,388 45,529 74,222 20,400 51,286 67,644 290,645 698,788 6,045 10,636
DECEMBER
Total Flows
Monthly Ave 1,145,232 138,300 69,149 77,682 20,400 63,674 87,727 348,129 821,093 5,558 12,176

To
West Goshen 860,101

2010 flowmeters -all-stations separate month worksheets.xlsSUMMARY

November Precip. 1.87 - 2010

Precip.: 0, 0.2, 0.4, 0.6, 0.8, 1, 1.2, 1.4, 1.6, 1.8, 2

snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34

November

October Precip. 15.16 - 2010

Precip.: 0, 2, 4, 6, 8, 10, 12, 14, 16

snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34

October

Monthly Totals 2010 (Jan-Dec)

Precip.: 0, 2, 4, 6, 8, 10, 12, 14, 16

Month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12

Monthly Totals

November Precip. 2.53 - 2010

Precip.: 0, 0.5, 1, 1.5, 2, 2.5, 3

Snow/rain: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34

November

Monthly Totals 2010 (Jan-Dec)

Precip.: 0, 2, 4, 6, 8, 10, 12, 14, 16

Month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12

Monthly Totals

Flowmeters Nov. 2010

Flow#s: 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000

Day of the month: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30

November

Monthly Totals 2010 Jan-Dec

Flowmeters: 0, 500000, 1000000, 1500000, 2000000, 2500000

Month: January, February, March, April, May, June, July, August, September, October, November, December

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

November 23, 2010

Dear Property Owner:

The purpose of this letter is to inform you that Liberty Towers, LLC has applied for a Zoning Variance requesting relief from the zoning ordinance. The applicant is requesting that the Zoning Hearing Board grant relief to allow a Wireless Communications Facility use in the C-2 Zoning District, and for dimensional relief from the rear yard setback requirements. If granted the relief the applicant proposes to construct a 150 foot tall Wireless Communications tower behind the Wawa store at 1594 Paoli Pike.

The applicant requests relief from the following sections of the Township Zoning Ordinance: §240-15.B and §240-15.G.

Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.

This application is scheduled to be discussed during the meetings outlined below, and is subject to change. Visit the Township website for current information:

December 1, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)

December 14, 2010 - Board of Supervisors meeting (at 7:00 pm)

Date To Be Determined - Zoning Hearing (Please check the Township website for the Hearing Date and time)

All meetings are held at the Township Building, are open to the public and are subject to change. This variance application is available for review at the Township Building during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[signature]
Mark A. Gordon
Township Zoning Officer

Cc: All Township Boards and Commissions
Jeff Sommer, Esq. Township Solicitor (Via Email)
Mark Thompson, Esq. Zoning Hearing Board Solicitor (Via Email)
Richard J. Lemanowicz, Esq. (Via Email)

F:\Data\Shared Data\Property Management\53-4\53-4-80.01 (1594 Paoli Pike)\Liberty Towers Nov 2010 CU App\1000 foot ltr ZV 11232010.doc

PMAA
Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401 Wormleysburg, PA 17043
717-737-7655 ▪ 717-737-8431(Fax)
www.municipalauthorities.org ▪ info@municipalauthorities.org

TO: Association Members
FROM: Mark Nicely, Conference Chair
Douglas E. Bilheimer, Executive Director
DATE: December 2, 2010
SUBJECT: 2011 PMAA Annual Conference

Call for Papers/Session Topics

As PMAA begins planning for the 2011 Annual Conference, we are asking you, the members, for your suggestions and possibly expertise in presenting your information to the conference delegates.

As authorities, you may have recently completed a project or administrative program that has made your authority more efficient or operationally advanced. As PMAA members, sharing your experiences is part of the benefits of Association participation. If you are an authority simply looking for guidance in a certain area of operations or management, please use this opportunity to express your interest in a topic.

Associate members, PMAA has relied on your expertise in educating our membership at countless seminars and conferences. PMAA prides itself in providing the premier industry forum for networking and information exchange. If you or your firm has a particular area of expertise, an interesting case study or a suggestion for conference educational session, please share your idea with the Conference Committee using the form below.

Please complete the form below with your suggestions or proposals. The Conference Committee will be provided with a complete listing of your educational session ideas.

Submitted ideas not chosen for the 2011 Conference may be utilized at other PMAA educational sessions.

Forms must be completed and returned no later than Friday, January 14, 2011. This form can be faxed to the PMAA office at 717-737-8431 or e-mailed to lehman@municipalauthorities.org

Contact Person: __________________________________ E-mail: __________________________________
Authority/Firm: ____________________________________________________________________________
Phone No.: __________________________________ Fax No.: __________________________________
Topic: ____________________________________________________________________________________
Have you previously presented this topic?      □ Yes      □ No
If yes, could you provide a reference from that presentation? ______________________________________

Topic Summary (2 or 3 sentence overview, use back of paper or an additional sheet if more room is needed):



□      Yes, our Authority/Firm would be willing to present a session or portion of a session relating to the above-mentioned topic.

□      We would suggest the Association provide an educational session on the above-mentioned topic.

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 1, 2010

Mr. Joseph M. McCawley
1621 Eldridge Drive
West Chester, PA 19380

RE: Municipal Authority Reappointment

Dear Joe:

I am pleased to inform you that at their meeting on Tuesday, November 23, 2010, the Board of Supervisors reappointed you to a five-year term on the East Goshen Township Municipal Authority Board.

On behalf of the Board and the residents of East Goshen Township, I would like to take this opportunity to thank you for your dedicated service. We look forward to working with you in the future.

As always, if we can be of any assistance, please feel free to call.

Sincerely yours,

[signature]
Rick Smith / m
Louis F. Smith, Jr.
Township Manager

Nns

Cc: Municipal Authority

F:\Data\Shared Data\ABC'S\Municipal Authority\appointments\mccawley\mccawley120110.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 1, 2010

Kevin Cummings
1606 Williams Way
West Chester, PA 19380

RE: Municipal Authority Appointment

Dear Kevin:

I am pleased to inform you that at their meeting on Tuesday, November 23, 2010 the Board of Supervisors appointed you to the East Goshen Township Municipal Authority.

The Municipal Authority holds their formal meeting the second Monday of each month at 7:00 PM and may schedule workshops as needed. A meeting agenda and applicable information will be delivered to your home the weekend prior to each meeting.

As always, if we can be of any assistance, please feel free to call.

Sincerely yours,

[signature]
Rick Smith / m
Louis F. Smith, Jr.
Township Manager

nns

cc: Municipal Authority

F:a\Shared Data\ABC'S\municipal authority\appointments\cummings 120110.doc

Memo

East Goshen Township

1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: August 12, 2010
To: Planning Commission
Municipal Authority
Park & Rec Board
Conservancy Board
Historical Commission
From: Rick Smith, Township Manager
Re: Comprehensive Plan Goals

Background - The Comprehensive Plan (Plan) that the Board of Supervisors adopted on June 21, 2005 identifies a series of action items that need to be completed in order to accomplish the goals set forth in the Plan. These action items are set forth in Chapter 10 of the Plan.

Chapter 10 lists the timeframe for completion, the priority, the method of implementation and the party responsible for each action item. A recent review indicates that while we as a Township have made significant strides in completing the action items the work is not yet complete.

Enclosed is a list of the applicable action items for each ABC. This list only includes a summary of each action and additional information is available in the Plan. The complete Plan is available on the Township web page, if you would like a hard copy of the plan just let me know.

Required Action - The Board would like each ABC to review their list of action items to see which items can be competed by year-end. The ABC would report on these at the Annual Planning Session. In addition, each ABC should use their list of action items as a basis for determining their goals for 2011.

Enclosures

Cc: Board of Supervisors
Staff Liaisons

F:\Data\Shared Data\ABC'S\Goals\COMP PLAN GOALS\Memo to ABCs 081210.doc

Memo

East Goshen Township

1580 Paoli Pike
West Chester, PA 19380
Voice 610-692-7171
Fax 610-692-8950
E-mail rsmith@eastgoshen.org

Date: December 5, 2010
To: Board of Supervisors
Conservancy Board
Historic Commission
Municipal Authority
Planning Commission
Park and Recreation Board
Deer Management Committee
From: Rick Smith, Township Manager
Re: 2011 Planning Session, Saturday, January 8, 2011

The Annual Planning Session Meeting will be held on Saturday, January 8, 2011 at 8:05 am and the agenda will be as follows:

At the Planning Session a representative from each ABC is expected to outline their respective ABC's Goals accomplishments for 2010 as well as their goals for 2011. As I noted in my August 12, 2010 memo (attached) the Board of Supervisors would like each ABC to use the action items from the Comprehensive Plan as a basis for their goals.

8:05 am      Conservancy Board

8:25 am      Historic Commission

8:45 am      Municipal Authority

9:05 am      Park and Recreation Board

9:25 am      Planning Commission

9:45 am      Deer Management Committee

10:05 am      Board of Supervisors Recap

PS to Jim McRee: Since the Deer Management Committee does not have action items in the Comp Plan a recap of the 2009/2010 program and YTD info on the 2010/2011 program would suffice.

F:\Data\Shared Data\Agendas\Board of Supervisors\2011\2011 Planning Session.doc