Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

MA Minutes 02/08/2010 1

EAST GOSHEN TOWNHIP MUNICIPAL AUTHORITY 1 MEETING MINUTES 2 February 8, 2010 3 4 The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday 5 February 8, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: 6 Fran Beck, Jack Yahraes, Joseph McCawley and Michael Steinberger. Also in attendance were: 7 Rick Smith, Township Manager; Dave Evans and Scott Towler from Brickhouse Environmental; 8 Evan Andrews, Authority Engineer; Bob Adams, Authority Solicitor; Carmen Battavio, Township 9 Supervisor; and Megan Hedgecock, Planning Commission. 10 11 COMMON ACRONYMS: 12 MA- Municipal Authority I&I – Inflow & Infiltration 13 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 14 PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant 15 CB – Conservancy Board DEP – Department of Environmental Protection 16 PR – Park & Recreation Board EPA – Environmental protection Agency 17 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 18 SSO – Sanitary System Overflow WAS – Waste Activated Sludge 19 20 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 21 Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the 22 Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. 23 24 2. RCSTP REPORTS 25 a. Scott reported that the construction of the Ridley Creek Sewage Treatment Plant 26 (RSCTP) continues to focus on the mechanical and electrical equipment and wiring located 27 within the new treatment building, existing control building, screen building and influent 28 pump station. During January the electrician commenced installation of the cable and wires 29 between the buildings and individual equipment control panels. Electrical power to the 30 Screen building was completed with wires and cable pulled to the influent lift station. Primer 31 and finish coat painting of the Screening and Treatment building interiors was completed. 32 The influent, treated effluent and blower piping within the interior and exterior of the 33 treatment building have been painted and color coded. During January, PECO notified the 34 electrical contractor, William H. Clinger Corp (Clinger), an additional utility pole with a 35 gang operated disconnect switch and changes to the lightning arrestors and terminal fuses 36 was required. Representatives from PECO provided details the week of February 1st and 37 representatives from the Municipal Authority met with Clinger and their sub contractor to 38 discuss the location of the pole, obtaining a proposal and installation schedule. A special 39 meeting of the East Goshen Township Municipal Authority is scheduled fro Friday, 40 February 5th to discuss the proposal. 41 The project schedule has not slipped during the month and electric power to MCC-3(New 42 Treatment Building) remains for February 22nd. The dry start up remains in schedule with 43 Siemens for March 8th. Coordination among the contractors, facility operator and design 44 engineers has been progressing in a cooperative spirit. 45 Administrative and contractual items on task for presentation to the Authority Board 46 members include discussion of the proposed change order number one (1) for Worth & Co. 47 and change order number one (1) for William H. Clinger Corp. 48 49

MA Minutes 02/08/2010 2

1 b. Scott commented there is plenty of work on the site for Clinger. A Pennoni inspector 2 had to assist Worth with today’s start-up. 3 4 RCSTP CHANGE ORDERS 5 A. Worth change order #1, $42,000.00 credit. Joe moved to approve. Mike seconded the 6 motion. There was no further discussion or public comment. The motion passed 7 unanimously. 8 9 B. Clinger change order #1, included CO1 and CO2 totaling $28,691.00. Joe moved to 10 approve. Fran seconded the motion. Mike wanted the description in CO2 to read “PECO”. 11 There was no further discussion or public comment. The motion passed unanimously 12 13 3. RCSTP INVOICES 14 A. Worth application #14, 1/31/10, $207,881.86. Mike moved to approve payment. Fran 15 seconded the motion. There was no further discussion or public comment. The motion 16 passed unanimously. 17 18 B. Clinger application #10, 1/31/10, $139,092.94. Joe moved to approve payment. Fran 19 seconded the motion. There was no further discussion or public comment. The motion 20 passed unanimously. 21 22 C. Pennoni, #430452, 1/29/10, $24,224.58. Joe moved to approve payment. Mike 23 seconded the motion. There was no further discussion or public comment. The motion 24 passed unanimously. 25 26 D. Brickhouse, #5196, 2/1/20, $7,618.75. Mike moved to approve payment. Fran seconded 27 the motion. There was no further discussion or public comment. The motion passed 28 unanimously. 29 30 E. L/B Water Service (for a hydrant) #3619912, 1/31/10, $1,414.97. Joe moved to approve 31 payment. Mike seconded the motion. There was no further discussion or public comment. 32 The motion passed unanimously. 33 34 4. CHAIRMAN’S REPORT 35 A. Jack reported that Rick gave a very good presentation at the West Goshen meeting. 36 37 5. APPROVAL OF MINUTES 38 Joe moved to approve the minutes of the Special meeting on February 5, 2010. Jack 39 seconded the motion. The motion passed unanimously. Approval of the January regular 40 meeting was tabled until the March meeting. 41 42 6. ENGINEER’S REPORT 43 Evan reported that construction phase services at RCSTP continue as planned. Special 44 meetings with the contractors were held to coordinate electrical and controls issues and start- 45 up of the SBRs. Equipment start-up will start unit-by-unit in February and continue into 46 April. Current project schedule anticipates substantial completion in June 2010. It is 47 suspected that this date may slip into July depending on start-up schedule. A breakdown of 48

MA Minutes 02/08/2010 3

effort expended in January by Pennoni is provided with the invoice detail. Additional effort 1 was expended this month at the request of the Township to facilitate progress on the project. 2 At present the current authorized schedule (11/2009 to 6/2010) is approximately 38% 3 complete and budget is approximately 41% expended. 4 5 I/I Metering Project – Metering at the intersection of Saratoga Dr. and Paoli Pk.; Tallmadge 6 Dr. and Paoli Pk.; and the Ridley Creek Interceptor immediately upstream of the 8-inch 7 sewer from Achom Drive continues. Review of the data through January 18th indicates that 8 the meters are working properly. A meeting was held with Rich and Mark to review I/I 9 investigation and metering for the past 6 months and looking forward through 2010. 10 Assistance from Pennoni’s RCSTP inspector, Matt McAloon, was requested on an as- 11 needed basis to assist in the investigation and evaluation of remedial alternatives. A budget 12 not to exceed $4,500.00 was approved by Rick, subject o final approval by the Board. 13 14 Ridley Creek Consent Order – Temporary flow meters have been installed by the Township 15 at the locations noted above under “I/I Metering Project”. The next deadline is the Semi- 16 Annual Report due March 31, 2010. 17 18 Chapter 94 Reporting – Preparation of Chapter 94 Reports has started with the collection of 19 data and breaking down the single township-wide report to individual reports for RSCTP, 20 LCESP, West Goshen Service Area, and the southern portion of the Township that goes to 21 Westtown. The reports are due to DEP on March 31, 2010. 22 23 LCSTP and Pump Station Diversion Planning – Survey of the sewer extension location is 24 nearly completed. The effort was delayed into January due to the heavy snowfall at the end 25 of December. A wetlands presence/absence evaluation was conducted and wetlands were 26 identified adjacent to the proposed sewer extension but it should not impact the 27 design/permitting of the extension. 28 29 Hershey Mill PS Diversion Planning – Survey of the sewer extension location is nearly 30 completed. The effort was delayed into January due to the heavy snowfall at the end of 31 December. A wetland presence/absence evaluation was conducted and wetlands were 32 identified from the woods adjacent to the Hershey Mill storage yard to the end of Cornwallis 33 Dr. The route also crosses Ridley Creek. Use of Horizontal Directional Drill (HDD) to 34 cross under the wetlands and creek (a run of approximately 1,200 feet) is possible but a 35 general permit for passing under the creek will be necessary. 36 37 Reserve (Sherman) PS Elimination Planning – Survey of the sewer extension location is 38 nearly completed. The effort was delayed into January due to the heavy snowfall at the end 39 of December. The route of the sewer extension has been shortened to avoid wet areas and 40 will now include a crossing under Ridley Creek. A wetlands presence/absence evaluation 41 was conducted and a small wetlands area was identified along the edge of the creek. This 42 are will be avoided. A general permit for passing under the creek will be necessary. 43 44 Marydell Pump Station Diversion Planning – Survey of the sewer extension location is 45 complete and the topographic plans are being prepared now. The effort was delayed into 46 January due to the heavy snowfall at the end of December. 47

MA Minutes 02/08/2010 4

West Goshen Diversion Planning – A meeting will be held with West Goshen to review the 1 particulars of this diversion as well as the diversion of the Hershey Mill and Marydell Pump 2 Stations. It was noted that Rick Smith attended the West Goshen Authority meeting last 3 Thursday. 4 5 A proposal was presented by Pennoni for Chester Creek Sewage Collection System 6 Modeling. This was deferred to the June meeting. 7 8 7. APPROVAL OF INVOICES 9 A. Gawthrop Greenwood, #76524, 12/31/09, $950.00. Joe moved to approve payment. 10 Fran seconded the motion. There was no further discussion or public comment. The motion 11 passed unanimously 12 13 B. Deckman Electric, Inc, #78854, 12/18/09 $470.00. This is being recharged to Worth. 14 Joe moved to approve payment. Fran seconded the motion. There was no further discussion 15 or public comment. The motion passed unanimously 16 17 C. Pennoni, #430454,1/12/10, $4,412.00. Mike moved to approve payment. Joe seconded 18 the motion. There was no further discussion or public comment. The motion passed 19 unanimously 20 21 D. Pennoni, #430450, 1/29/10, $2,092.50. Mike moved to approve payment. Fran 22 seconded the motion. There was no further discussion or public comment. The motion 23 passed unanimously 24 25 E. Pennoni, #430451,1//29/10, $3,449.75. Mike moved to approve payment. Joe seconded 26 the motion. There was no further discussion or public comment. The motion passed 27 unanimously. 28 29 F. Pennoni, #430453, 1/29/10, $4,496.50. Joe moved to approve payment. Fran seconded 30 the motion. There was no further discussion or public comment. The motion passed 31 unanimously. 32 33 The other items on the Agenda are regular construction facilities costs that the Township 34 staff should process. 35 36 8. LIAISON REPORTS 37 Planning Commission – Meghann Hedgecock reported that TMobile is requesting a 49 foot 38 pole at New Kent Apartments. They received a request for an amendment to the United 39 Church of Christ for a day care program to be run by an individual instead of the Church. 40 They received a request from a resident to discuss Traditions. 41 42 9. FINANCIAL REPORTS 43 Mike had no comments on the reports. 44 45 10. GOALS 46 Fran will provide an article for the next newsletter. 47 48

MA Minutes 02/08/2010 5

11. OLD BUSINESS 1 Budget for 2010 – Tabled until the March meeting. Mike wants to include contingencies. 2 Also, should amounts not used in 2009 budget be carried over to the 2010 budget. Capital 3 Expansions – Mike pointed out that this started at $450,000 and only $12,000 was used so 4 the total remaining should be more than the $225,000 shown. Rick will check this. 5 6 12. NEW BUSINESS 7 A. A professor from Penn state, Michael H. Gerardi, will be here on March 15th at 10:00 am 8 to give a 1 hour presentation about SBR’s to all interested personnel. A tour of the plant 9 will follow. He is developing a protocol for testing to be sure plants operate as expected. 10 The cost is $950.00. Municipal Authority members approved this meeting. 11 12 B. M.J. Mirarchi Builders Inc. is requesting permission to connect the proposed 5 lot 13 subdivision to the East Goshen Township Sewerage system which is located on Line Road, 14 in Willistown, directly opposite the Applebrook subdivision. Rick will calculate the tapping 15 fees. A decision was tabled. 16 17 13. CAPACITY REQUESTS 18 None 19 20 14. SEWER REPORTS 21 Mark Miller reported that meters were read on a daily basis as well as the portable meters. 22 They have installed the portable meters at the locations that Evan request. The pump 23 stations were visited on a daily basis and the collection baskets were cleaned. No problems 24 to report. They have been clearing the right-of-way. They cleaned approximately 2500 feet 25 of sewer line on the R.C. Collection. The aerators were brought to the landside and greased. 26 The bar screen was pulled and washed down. The sewer cleaner was utilized to assist the 27 plant operator with cleaning of the weirs. They are having a problem with the transfer line 28 one Tank 2. They may have to partially drain the tank to clear the clog. As of 2/2/10 at 29 11:00 am the Public works Department cleared the clog. There were 100 PA One Call’s for 30 the month of January. 31 32 15. ANY OTHER MATTER 33 None 34 35 16. CORRESPONDENCE 36 Jack acknowledged receipt of the following letters: 37 a. Gawthrop Greenwood reappointment letter. 38 b. Francis Beck reappointment letter. 39 40 17. PUBLIC COMMENT 41 None 42 43 44 45 46 47 48

MA Minutes 02/08/2010 6

18. ADJOURNMENT 1 There being no further business, Mike moved to adjourn the meeting. Fran seconded the 2 motion. There was no further discussion or public comment. The motion passed unanimously. The 3 public meeting was adjourned at 8:30 p.m. 4 5 Respectfully submitted, 6 7 8 Ruth Kiefer, Recording Secretary 9 10 C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 02-08-10 Draft.doc 11