Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

MA Minutes 11/08/2010 1

1 EAST GOSHEN TOWNHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 November 8, 2010 4 5 The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday 6 November 8, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance 7 were: Jack Yahraes, Fran Beck, Dana Pizarro, and Joseph McCawley. Also in attendance were: 8 Rick Smith, Township Manager; Mark Miller, Director of Public Works; Scott Towler from 9 Brickhouse Environmental; Dan Barbato from Pennoni; and Bob Adams, Authority Solicitor; 10 11 COMMON ACRONYMS: 12 MA- Municipal Authority I&I – Inflow & Infiltration 13 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 14 PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant 15 CB – Conservancy Board DEP – Department of Environmental Protection 16 PR – Park & Recreation Board EPA – Environmental protection Agency 17 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 18 SSO – Sanitary System Overflow WAS – Waste Activated Sludge 19 20 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 21 Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the 22 Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. 23 At 7:05 pm Fran moved to go into Executive Session. Joe seconded the motion. The motion 24 passed unanimously. The Executive Session ended at 7:15 pm and the regular meeting 25 started. 26 27 2. RCSTP REPORTS 28 A. Brickhouse Report 29 Scott reported that all four (4) Phases of the Ridley Creek Sewage Treatment Plant Upgrade 30 and expansion were completed during October 2010. The Authority’s Engineer accepted 31 substantial completion dates for Wm. Clinger Corporation and Worth & Company as 32 September 17, 2010 and October 21, 2010 respectively. 33 34 The Authority’s Engineer issued “punch lists” to the contractors on October 14, 2010. Both 35 Contractors have worked towards resolving the issues to achieve final project completion. 36 Completion of the punch list work is anticipated on or before November 30, 2010. 37 38 EGTMA Staff installed base paving within the facility perimeter with plans for final paving 39 during 2011. Concrete pads at the entrance doors for all of the buildings and sidewalks 40 along the existing control building North side were installed by the Township staff. 41 Installation of the new fence along the perimeter of the facility was completed. 42 43 The SBR treatment process is achieving the current permit discharge limitations and, 44 sampling for the new permit discharge limitations was initiated the week of October 25, 45 2010. Review of the final effluent total nitrogen and phosphorus laboratory test results are 46 planned for developing an initial indicator of the plant’s performance. Aluminum sulfate 47 chemical feed systems are planned to be placed in service during the week of November 8, 48 2010 to being lowering the final effluent total phosphorus concentration to 0.5mg/L. 49

MA Minutes 11/08/2010 2

The Siemens warranty performance testing of the treatment system is scheduled to begin 1 November 29, 2010 with the centrifuge dewatering system testing anticipated for mid 2 December 2010. Implementation of the new NPDES final effluent discharge requirements 3 is planned for first quarter 2011. Prior to implementing the new discharge permit 4 limitations, representatives from PADEP are planned to be invited to visit the facility and 5 review operations. 6 7 The SBR power failed. Some wires were burned. The alarm system did not call out. 8 Clinger is responsible for all electric. The electrical study will cost between $5,000 - $8,000 9 in case the Municipal Authority has to get a third party to do the study. 10 11 B. Pennoni – Dan Barbato, reported the following: 12 RCSTP Upgrade and Expansion 13 • Construction phase services have transitioned to punch list monitoring, review of 14 operations and maintenance submittals, and startup assistance, as well as the 15 continuation of progress meetings with the Contractors and Township, coordination 16 and communication with Birckhouse and the Township, and approval of contractor 17 Payment Requests. 18 • A breakdown of effort expended over the past month by Pennoni is provided with 19 the invoice detail under separate cover. 20 • Worth & Company and Clinger Corporation are working on punch list completion 21 and outstanding items are expected to be complete by the end of November. 22 • Pennoni will complete review of the Operations and Maintenance submittals by the 23 end of November. 24 25 I/I Metering Project 26 • The Township continues to meter flows at selected locations. Pennoni provided 27 recommendations for meters locations for the next round of data collection, and we 28 will review the data when it is available. 29 30 Ridley Creek Consent Order 31 • The Semi-Annual Report due on September 30 was prepared and submitted to DEP 32 on September 28 as required by the CO&A. The next report is due to DEP in March 33 of 2011. 34 35 LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning 36 • These documents were provided to the Township for submittal to DEP. The 37 Township received comments from DEP and we are in the process of addressing. 38 We anticipate completing the responses in early December. 39 40 Marydell PS Elimination Planning 41 • The draft report sections for the Act 537 Plan Revision are being assembled and a 42 determination will be made in the next week regarding the schedule to finish and 43 submit the report and required notifications. 44 45 Wastewater Contract Operations Bid 46 We are assisting with responses to bidder questions on the RFP. 47 48 49

MA Minutes 11/08/2010 3

Applebrook Comprehensive Groundwater Evaluation 1 • Applebrook Golf Course has agreed to fund the Comprehensive Groundwater 2 Evaluation needed to maintain the Water Quality Management Permit which allows 3 for spray irrigation on the golf course. The current NPDES allows for discharge of 4 treated wastewater to the irrigation pond on the golf course, providing water for 5 irrigation. The Evaluation is in progress and we recently received responses to our 6 data request needed to complete the report. We anticipate completing the report in 7 November. 8 9 C. Cost Summary – None 10 11 D. Change Orders – The outstanding Worth & Company change orders and 12 recommendations from Rick were reviewed with the following results: 13 March 26, 2010 – Extension due to problems with Seimens and March 26, 2010 – Extension 14 due to Clinger. Joe moved to deny both requests as recommended. Fran seconded the 15 motion. There was no further discussion. The motion passed unanimously. 16 17 PCO 12 – Additional steel beam in SBP building - $4,703.27 and PCO 13 – Control Joint 18 Modification in Screen Building - $4,499.12. Fran moved to approve payment of these 2 19 change orders and back charge half of the cost to Pennoni. Dana seconded the motion and 20 pointed out that Evan previously conceded these costs. There was no further discussion. 21 The motion passed unanimously. 22 23 PCO 11, PCO 14, and PCO 18 are on hold until more information is available. 24 25 3. RCSTP INVOICES 26 A. Fran moved to approve payment for the following invoices. Dana seconded the motion. 27 There was no further discussion or public comment. The motion passed unanimously. 28 a. Gawthrop Greenwood, #82932, 9/20/10 $ 1,242.50 29 b. O’Rourke and Sons, #164372, 10/7/10 $ 665.00 30 c. Charles Blosendki Disposal, 10/18/10 $ 2,531.00 31 d. Power Pro Equipment, #P32279, 10/13/10 $ 129.48 Credit 32 e. Power Pro Equipment, #P32136, 10/5/10 $ 2,073.90 33 f. Power Pro Equipment, #P32515, 10/27/10 $ 17.50 34 g. Martin Limestone, #302736, 10/18/10 $ 577.93 35 h. Martin Limestone, #302737, 10/18/10 $ 296.35 36 i. Martin Limestone, #302735, 10/18/10 $ 299.83 37 j. Vimco, #339422, 10/21/10 $ 270.75 38 k. Ransome Rental Co., #K0312001, 10/20/10 $ 608.00 39 l. Ransome Rental com. #K0308701, 10/25/10 $ 1,984.00 40 m. Yerkes Assoc., #38547, 10/5/10 $ 571.88 41 n. Pennoni, #454783, 10/27/10 $ 12,326.15 42 o. Pennoni, #454693, 10/27/10 $ 1,620.00 43 p. Brickhouse Environmental, #5596, 11/1/10 $ 517.50 44 q. Brickhouse Environmental, #5595, 11/1/10 $ 8,826.25 45 46 B. After discussion Joe moved to approve payment for the following invoice: 47 Worth & Co., P28001, 10/31/10 $224.000.00 48

MA Minutes 11/08/2010 4

Fran seconded the motion. There was no further discussion or comment. The motion 1 passed unanimously. 2 3 4. CHAIRMAN’S REPORT 4 Jack reported that the Goose Creek Coalition, of which West Goshen is a member, is 5 changing their attorney in litigation with DEP. 6 He also reported that Mike Steinberger formally resigned from the Municipal Authority 7 effective 12/31/10. 8 9 5. APPROVAL OF MINUTES 10 A. Fran moved to approve the minutes of the October 11, 2010 as corrected. Dana seconded 11 the motion. The motion passed unanimously. 12 13 6. ENGINEER’S REPORT – See 2B. 14 15 7. APPROVAL OF INVOICES 16 A. Joe moved to approve payment for the following invoices. Fran seconded the motion. 17 There was no further discussion. The motion passed unanimously. 18 a. Gawthrop Greenwood, 82931, 9/30/10 $ 475.00 19 b. Pennoni, #454694, 10/27/10 $ 603.75 20 c. Pennoni, #454595, 10/27/10 $ 1,548.75 21 d. Pennoni, #454693, 10/27/10 $ 1,620.00 22 e. Martin Limestone, #302737, 10/18/10 $ 294.86 23 24 Note: Invoice for Martin Limestone, #302735, 10/18/10, $300.20 was not a Municipal 25 Authority expense. 26 27 8. LIAISON REPORTS 28 A. Jack reported for Megann Hedgecock of the Planning Commission. The applications 29 discussed were AT&T to upgrade their cell tower on Strasburg Road, CTDI to expand 30 parking and Cavalli to construct a detached 2-car garage. 31 32 9. FINANCIAL REPORTS 33 None 34 35 10. GOALS 36 Dana will provide an article by Nov. 11, 2010 for the next Township newsletter. 37 38 11. OLD BUSINESS 39 None 40 41 12. NEW BUSINESS 42 A. Bids to perform the Performance Test were received from four labs. Mark 43 recommended Lancaster. Dana asked him to check if there is a Data Package and which 44 type. Mark will check on this. Dana moved to approve Lancaster Labs for $9,478.00 45 pending clarification of the Data Package. Fran seconded the motion. There was no further 46 discussion. The motion passed unanimously. 47 48

MA Minutes 11/08/2010 5

B. Joe moved to reappoint Gawthrop Greenwood as the Municipal Authority’s attorney for 1 2011 with no change in fees. Fran seconded the motion. There was no further discussion. 2 The motion passed unanimously. 3 4 C. Joe moved to continue Brickhouse Environmental as project manager. Fran seconded 5 the motion. There was no further discussion. The motion passed unanimously. 6 7 D. Joe moved to approve Maillie, Falconiero & Co. as auditor for 2010 at $7,500.00. Fran 8 seconded the motion. There was no further discussion. The motion passed unanimously. 9 10 E. Fran moved to authorize Mark Miller to purchase a stainless steel lift chain for the 11 removal of pumps in the SBRS at a cost of $2,483.00. Joe seconded the motion. There was 12 no further discussion. The motion passed unanimously. 13 14 13. CAPACITY REQUESTS 15 A. None 16 17 14. SEWER REPORTS 18 A. Mark Miller reported the following: 19 Meters – The meters were read on a daily basis. Meters were calibrated during the 20 month on October. The meter at the Hershey’s Mill Pump Station was knocked out 21 of service due to flooding. Allied Control pulled the meter and made repairs and 22 placed back in service. 23 24 CC Collection – The Public Works Department responded to several calls for 25 missing caps. 26 27 RC Collection – We located significant I/I in the line between Paoli Pike and North 28 Chester Road estimated at 20,000 gallons a day. We were able to narrow down the 29 INI by the use of portable meters. We also received odor complaints from the 30 Fairway Village. The timing on the pumps was changed to alleviate the effluent 31 going septic. 32 33 Ridley Creek Plant – The paving of the plant has been completed. Once the staging 34 area is restored, we will then finish paving the driveway. 35 36 Complete items for the month – Fencing, seeded and strawed, storm 37 drains/downspouts all piped PWD and side walks & blacktop are done. 38 39 15. ANY OTHER MATTER 40 None 41 42 16. CORRESPONDENCE 43 None 44 45 17. PUBLIC COMMENT 46 None 47 48 49

MA Minutes 11/08/2010 6

18. ADJOURNMENT 1 There being no further business, Fran moved to adjourn the meeting. Joe seconded the 2 motion. The meeting was adjourned at 8:30 p.m. 3 4 Respectfully submitted, 5 6 7 Ruth Kiefer, Recording Secretary 8 9 C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 11-08-10 Final.doc 10