Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

MA Minutes 12/13/2010 1

1 EAST GOSHEN TOWNHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 December 13, 2010 4 5 The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday 6 December 13, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance 7 were: Jack Yahraes, Fran Beck, Dana Pizarro, Mike Steinberger and Joseph McCawley. Also in 8 attendance were: Rick Smith, Township Manager; Scott Towler from Brickhouse Environmental; 9 Dan Barbato from Pennoni; Bob Adams, Authority Solicitor; and Kevin Cummings. 10 11 COMMON ACRONYMS: 12 MA- Municipal Authority I&I – Inflow & Infiltration 13 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 14 PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant 15 CB – Conservancy Board DEP – Department of Environmental Protection 16 PR – Park & Recreation Board EPA – Environmental protection Agency 17 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 18 SSO – Sanitary System Overflow WAS – Waste Activated Sludge 19 20 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 21 Chairman Jack Yahraes called the meeting to order at 7:00 p.m. and led those present in the 22 Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. 23 24 25 2. RCSTP REPORTS 26 A. Brickhouse Report 27 Scott reported that significant progress towards the electrical and general/mechanical punch 28 list items was completed during November. Both contractors have worked towards 29 resolving the issues to achieve final project completion and are approximately 95% 30 completed. The punch list work completion date has slipped to on or before December 31, 31 2010. Remaining items on the electrical punch list include the short circuit protection and 32 coordination and arc flash studies. Remaining items on the general/mechanical punch list 33 includes labels for non-potable water hydrants, replacing two hour meters, instrument panel 34 lamp and adjustment knob for a dissolved oxygen probe mounting bracket. 35 36 The SBR treatment process was observed to have achieved the proposed current new 37 effluent discharge limitations during the weeks of November 1st and 8th. The nitrate 38 concentration was observed to have risen from approximately 3 mg/L to 18 mg/L during the 39 week of November 15th. The fourth SBR tank was placed in service on November 19th in 40 preparation of conducting the Siemens Jet tech SBR performance/warranty test. The 41 treatment process continued to deteriorate and the solids concentration in the SBR effluent 42 increased. Technical support and guidance fro Siemens Technical Staff was initated during 43 the week of November 22nd and is ongoing. During a trial test of the alum feed system, an 44 issue with the pump controls appeared to have resulted in significantly overdosing the SBR 45 tanks with alum. Approximately 800 gallons was added to treatment process during a 24- 46 hour period. The control issue between the pumps and control panel was corrected on 47 December 9th by representatives for Siemens. 48 49

MA Minutes 12/13/2010 2

The Siemens warranty performance testing of the treatment system has been postponed until 1 January 2011 to adjust the treatment process. The centrifuge dewatering system 2 performance testing is scheduled for January 3, 2011. Informal conversations with the 3 facility inspector from PADEP have included on implementing the new NPDES final 4 effluent discharge requirements during the first quarter 2011 (February/March timeframe). 5 Prior to implementing the new discharge permit limitations, representatives from PADEP 6 will be invited to visit the facility, review operations and provide official notification of the 7 start date for the new effluent discharge permit limitations. 8 9 In November the VFD circuit breaker tripped. The GE service tech was investigating and it 10 was determined that there is a loose wire in the VFD which shorted causing the failure. It 11 was suggested that the other 3 VFD’s be checked. 12 13 B. Pennoni – Dan Barbato, reported the following: 14 RCSTP Upgrade and Expansion 15 • Construction phase services have transitioned to punch list monitoring, final review 16 of operations and maintenance submittals, and startup assistance and 17 troubleshooting, as well as the continuation of progress meetings with the 18 Contractors and Township, coordination and communication with Brickhouse and 19 the Township, and approval of contractor Payment Requests. 20 • A breakdown of effort expended over the past month by Pennoni is provided with 21 the invoice detail under separate cover. 22 • Worth & Company and Clinger Corporation are working on punch list completion 23 and outstanding items are expected to be complete this month. 24 • Pennoni has completed review of the Operations and Maintenance submittals for 25 Worth and Clinger and has provided comments back to both contractors. 26 • Pennoni will support plant performance testing activities as needed. 27 • Pennoni Design Engineer Tim Daily visited the plant to review the installation and 28 operation compared to the intent of his design. A report was submitted to the 29 Authority with details and recommendations. 30 31 • I Metering Project 32 • The Township continues to meter flows at selected locations. Meters are in the 33 process of being located to the proposed new locations, and we will review all meter 34 data as it is submitted. 35 36 Ridley Creek Consent Order 37 • The next report is due to DEP in March of 2011. No comments were received to 38 date on the September report submitted to DEP.. 39 40 LCSTP Elimination, Hershey Mill PS Diversion, Reserve PS Elimination Planning 41 • These documents were provided to the Township for submittal to DEP. The 42 Township received comments from DEP and we are in the process of addressing. 43 We have requested an extension from DEP to complete the response to their 44 comments by the end of February. Several of the DEP comments require that West 45 Goshen adopt resolutions. The extension will allow for time to prepare and submit 46 the resolutions for adoption. 47 48

MA Minutes 12/13/2010 3

Marydell PS Elimination Planning 1 • The draft report sections for the Act 537 Plan Revision are being assembled. We 2 anticipate completing the reports in late December or early January. Several 3 notification forms are being completed at this time 4 5 Applebrook Comprehensive Groundwater Evaluation 6 • Applebrook Golf Course has agreed to fund the Comprehensive Groundwater 7 Evaluation needed to maintain the Water Quality Management Permit which allows 8 for spray irrigation on the golf course. The current NPDES allows for discharge of 9 treated wastewater to the irrigation pond on the golf course, providing water for 10 irrigation. The report is drafted and will be ready for Township review before the 11 Holiday. No significant issues were identified as a result of the evaluation. 12 13 West Pikeland Township Sewer Capactiy Request 14 ● On August 5, 2010, West Pikeland Township requested East Goshen/DARA to 15 consider accepting 20,000 gallons per day of sewage from West Whiteland to facilitate West 16 Pikeland’s capacity needs. Our recommendation in response to the request is provided 17 under separate cover. Mike moved to deny the West Pikeland request. Joe seconded the 18 motion. The motion passed unanimously. Rick will write a letter. 19 20 The letter received from Dan outlining the proposed fee schedule for 2011 and Annual 21 Services was reviewed. Joe moved to retain Pennoni at the new proposed rates. Fran 22 seconded the motion. The motion passed unanimously. 23 24 C. Cost Summary – The Cost Summary was reviewed. Rick feels the cost should be closed 25 to $9.9 million. 26 27 D. Change Orders – Fran moved to approve Mark Miller’s request for $1,250.00 to 28 complete the landscaping between the SBR tanks and the homes backing up to the plant. 29 Joe seconded the motion. The motion passed unanimously. 30 31 Worth & Co., PCO-26, dated November 30, 2010, to add one additional 12’ gate in the new 32 fence, $1,409.44. Mike moved to approve payment. Dana seconded the motion. The 33 motion passed unanimously. 34 35 3. RCSTP INVOICES 36 A. Joe moved to approve payment for the following invoices. Dana seconded the motion. 37 There was no further discussion or public comment. The motion passed unanimously. 38 a. Fastenal, #PAMAV4919, 11/18/10 $ 2,474.04 39 b. Highway Materials, #1622530MB, 11/5/10 $ 1,828.36 40 c. Highway materials, #11025998MB, 11/05/10 $ 1,841.53 41 d. Highway Materials, #11026142MB, 10/18/10 $ 260.42 42 e. Highway Materials, #11026121MB, 11/17/10 $ 1,147.06 43 f. Brickhouse Environmental, #5683, 12/01/10 $ 9,947.50 44 g. Pennoni, #457258, 11/23/10 $ 4,097.75 45 h. Gawthrop, Greenwood, PC, #84386, 11/30/10 $ 171.00 46 i. Gawthrop Greenwood, PC, #84387, 11/30/10 $ 720.00 47 j. Gawthrop Greenwood, PC, #84078, 10/31/10 $ 720.00 48 k. Independence Const. #30-00010257, 11/05/10 $ 3,136.40 49

MA Minutes 12/13/2010 4

l. Independence Const. #30-00010259, 11/05/10 $ 4,202.99 1 m. Power pro Equip., #P32515, 10/27/10 $ 17.50 2 n. Silvi Concrete, #2122141, 10/21/10 $ 1,552.80 3 (already paid in Oct, need approval) 4 o. Reilly & Sons Inc., #000531, 11/02/10 $ 1,125.21 5 6 The following 4 invoices were either already approved for payment last month or do not 7 belong to the Municipal Authority: 8 a. Ransome Rental, #K0308701, 10/25/10 $ 1,984.00 9 b. Martin Limestone, #302737, 10/18/10 $ 296.35 10 c. Martin Limestone, #302735, 11/1/10 $ 299.83 11 d. Martin Limestone, #303385, 10/25/10 $ 593.57 12 13 Approval of Worth & Company Inc. Invoice #P28001, 11/30/10 for $125,000.00 was tabled. 14 15 4. CHAIRMAN’S REPORT 16 a. Jack announced that Mike has resigned from the Municipal Authority. He 17 expressed thanks to Mike for his service to the Authority. He introduced Kevin 18 Cummings who will replace Mike as of January 1, 2011. 19 b. Jack reminded everyone that next month they need to reorganize and vote 20 new officers. He suggested Joe for Chairman, Dana for Vice Chairman, Fran for 21 Secretary, Jack for Treasurer and Kevin for Assistant Secretary/Treasurer. 22 c. Jack announced that the ABC Annual Planning Meeting will be held on 23 Saturday, January 8, 2011 starting at 7:45 am. The Municipal Authority is scheduled 24 to give a report at 8:45 am. Jack will do the presentation. 25 d. Jack announced that Joe was reappointed to the Authority for a 5-year term 26 by the Board of Supervisors. 27 e. Jack asked Rick to have any mail dated before the meeting put in the 28 Municipal Authority mailbox and he will pick it up. 29 30 5. APPROVAL OF MINUTES 31 A. Joe moved to approve the minutes of the November 8, 2010 as corrected. Fran seconded 32 the motion. The motion passed unanimously. 33 34 6. ENGINEER’S REPORT – See 2B. 35 36 7. APPROVAL OF INVOICES 37 A. Gawthrop Greenwood, 84385, 11/30/10, $380.00. Joe moved to approve payment. 38 Mike seconded the motion. There was no further discussion or public comment. The motion 39 passed unanimously. 40 B. Pennoni, #457260, 11/23/10, $1,785.00. Mike moved to approve payment. Fran 41 seconded the motion. There was no further discussion or public comment. The motion 42 passed unanimously. 43 C. Pennoni, #457259, 11/23/10, $105.00. Joe moved to approve payment. Dana 44 seconded the motion. There was no further discussion or public comment. The motion 45 passed unanimously. 46 47 48 49

MA Minutes 12/13/2010 5

8. LIAISON REPORTS 1 A. Jack reported for the Historical Commission. New officers for 2011 are: Ellen, 2 Chairman, and Ben and Chris, Vice Chairmen. The Living History Day will be June 4, 3 2011. A statewide Civil War reenactment will be held in July 2011. Oct. 1, 2011 is Chester 4 County Day and will feature the East Goshen quadrant. 5 B. Jack reported for the Board of Supervisors. Carmen has requested to be named the 6 liasion for the Municipal Authority for 2011. He thanked everyone for coming to the 7 Holiday Party. 8 9 9. FINANCIAL REPORTS 10 None 11 12 10. GOALS 13 Dana did provide an article by Nov. 11, 2010 for the next Township newsletter. 14 Jack attended the West Goshen meeting. 15 16 11. OLD BUSINESS 17 None 18 19 12. NEW BUSINESS 20 None 21 22 13. CAPACITY REQUESTS 23 None 24 25 14. SEWER REPORTS 26 A. Mark Miller reported the following: 27 Meters – The meters were calibrated for the last quarter. The Public Works 28 employees read the meters on a daily basis. 29 30 CC Collection – There were 3 lateral clogs. Two were caused by children throwing 31 debris down the clean-out pipe. 32 All the pumping stations wet wells were cleaned. New floats were installed at the 33 Ashbridge Pump station. Also, there was a problem with the transducer. 34 35 RC Collection – The pumping station was visited on a daily basis no problems to 36 report. 37 38 Lochwood Plant – The plant was visited on a routine basis. Several trees fell in the 39 spray fields. They are scheduled for removal this month. 40 41 Ridley Creek Plant – Was visited on a daily basis. Routine maintenance was done to 42 the screen. A new strainer was ordered for the utility water line. The floors in the 43 SBR Building were scrubbed and sealed. 44 45 Pa One Calls – 89 PA One Calls were received for the month of November. 46 47 Alarms – 27 alarms for the month of November. 48 49

MA Minutes 12/13/2010 6

The new management of operation of the plant will be done by Miller 1 Environmental. 2 3 15. ANY OTHER MATTER 4 None 5 6 16. CORRESPONDENCE 7 None 8 9 17. PUBLIC COMMENT 10 None 11 12 18. ADJOURNMENT 13 There being no further business, Mike moved to adjourn the meeting. Joe seconded the 14 motion. The meeting was adjourned at 8:30 p.m. 15 16 Respectfully submitted, 17 18 19 Ruth Kiefer, Recording Secretary 20 21 C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 12-13-10 Final.doc 22