Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
December 14, 2009
Monday, 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE Announce that the Recording Secretary will be taping the meeting for her use and that the tape will be erased when the minutes for that meeting have been approved.; Ask if anyone will be taping the meeting?
  2. RIDLEY CREEK REPORTS Brickhouse Environmental -; Pennoni -; Status update for Proposed Change Order; Worth & Company Change Orders/Handrail; Continued Construction Services
  3. RIDLEY CREEK INVOICES Gawthrop Greenwood #74709, 11/31/09 $ 285.00; Brickhouse Environmental, #5090, 12/1/09 $7,963.75; Worth & Company; Clinger
  4. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
  5. APPROVAL OF MINUTES November 9, 2009
  6. ENGINEER'S REPORT Pennoni report
  7. APPROVAL OF INVOICES Pennoni, #424688, 11/24/09 $ 511.50; Pennoni, #424689, 11/24/09 $ 662.25; Pennoni, #424694, 11/24/09 $ 11,265.00; Gawthrop Greenwood, #74708, 10/31/09 $ 1,118.02; Gawthrop Greenwood, #75677, 11/30/09 $ 665.00;
  8. LIAISON REPORTS
  9. FINANCIAL REPORTS
  10. GOALS
  11. OLD BUSINESS
  12. NEW BUSINESS Marydell Pump Station Diversion Project Planning Amendment; Lockwood Chase Sewage Treatment Plant Planning Amendment; Hershey Mill and Reserve Pump Station Diversion Amendment; Approve Gawthrop Greenwood' 2010 Fees for Legal Services CAPACITY REQUESTS
  13. SEWER REPORTS Director of Public Works Report – November 2009;

Monday, December 14, 2009

- 1 -

  1. ANY OTHER MATTER
  2. CORRESPONDENCE AND REPORTS OF INTEREST Letter from Resident Jo-Anne Fote complimenting Public Works Director, Mark Miller
  3. PUBLIC COMMENT
  4. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Delivery date
February 10, 2010 April 1, 2010
May 12, 2010 July 1, 2010
August 11, 2010 October 1, 2010
November 10, 2010 January 1, 2011

Monday, December 14, 2009

- 2 -

[Handwritten note in top right: 2. RIDLEY CREEK REPORT a. 2 pgs]

Brickhouse Environmental

Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
November 2009

The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:

  • 11-2-09 Contractor invoice reviews at the site. Site inspection of work completed.
  • 11-3-09 Meeting w/ Worth, Rick Smith and Pennoni Associates re: discussion and evaluation of merits of Change Orders submitted to date.
  • 11-4-09 Prepare draft Project Manager's report and distribution to Pennoni inspector for comment.
  • 11-5-09 Progress site visit, review notes w/ Pennoni and work recently completed.
  • 11-6-09 Informal meeting w/ Rick Smith, Mark Miller & Pennoni inspector to discuss elements of the 11-3-2009 meeting.
  • 11-6-09 Drafted letter summarizing prior meetings, made recommendations and distributed letter.
  • 10-7-09 Reviews and draft correspondence preparation regarding PCO-11. Prepare response letter to resident Kevin Snyder.
  • 11-9-09 Finalized PM Report by incorporating comments.
  • 11-9-09 Attended Authority Meeting and presented Project Manager's report.
  • 11-9-09 Conversation to update Joe McCawley, who could not attend the Authority Meeting.
  • 11-10-09 Contacts w/ Clinger's Bob Dina for meeting scheduling to discuss additional expenses.
  • 11-12-09 Prepared for and attend meeting w/ Clinger and EGTMA to discuss additional expenses resulting from construction delays.
  • 11-12-09 Attended progress construction meeting.
  • 11-12-09 Progress site visit.

[Handwritten note in top right: 2 of 2]

Brickhouse Environmental

  • 11-16-09 Progress site visit.
  • 11-18-09 Progress site visit. Observed first day of two day Treatment Plant concrete floor pour. (Poured east to west in alternating pads). Treatment Building synthetic roof being glued to foam insulation panels. Screen Building roof shingling completed.
  • 11-19-09 Meeting w/ Rick Smith and Mark Miller.
  • 11-20-09 Progress site visit. Met w/ Worth's Jeff Bush to discuss electrical work schedule update.
  • 11-20-09 Meeting w/ Pennoni (Matt McAloon & Frank Ciufo) to discuss construction schedule and proposed opening around fine screen.
  • 11-24-09 Site progress visit. Observed blower start up and check by manufacturer representative. Treatment Building floor pouring had been completed on 11-23-09. Blowers placed on new pads 11-24-09 but not yet anchored. Building exterior base coated with water proofing. Screen Building water proofing planned for by end of week. Blower #4 motor and bearings found to be bad.
  • 11-25-09 Prepared for and attend progress construction meeting.
  • 11-25-09 Progress site visit.
  • 11-30-09 Conversation w/ Pennoni inspector re: construction update. Reviewed recent submittals.

Note: As of November 30, 2009 the cumulative project management hours budgeted was 750. The actual cumulative hours were 504.

J:\092532.0\November 2009 Bullets.doc

[Handwritten notes at top: "BRICKHOUSE" | 2. RIDLEY CREEK REPORT C. 3 pgs | Dec MA MTS]

November 9, 2009

East Goshen Township Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Re: Status Update for Proposed Change Orders

Dear Authority Board Members,

On Wednesday, November 4, 2009, Dave Evans and met with the Evan Andrews, Pennoni Associates, Inc., Jeff Bush, Worth & Company, Inc. to discuss the proposed change order requests. On Friday, November 6, 2009, we later met with Rick Smith and Mark Miller to review all of the information presented to develop a recommendation for the Authority's consideration. A summary of the unresolved proposed change orders, respective cost and a recommended action is listed.

Proposed Change Order Number Description Cost Recommendation
PCO-01 Repairs to Blower No. 1 $3,209.70 The Authority previously approved this change order and payment to Worth & Company should be verified.
PCO-03 Over excavation at the influent lift station $2,703.00 Recommended for approval and payment.
PCO-04 Repairs to Blower No. 2 $5,542.80 Recommended for approval and payment. The Authority directly paid the manufacturer for the electric motor.
PCO-05 Additional cost for the change in the top entry mixer design. $7,075.20 Recommended for approval and payment contingent on Worth & Company providing separate price quotes from the vendor for each mixer design.

[Handwritten note in top right: 2 of 3]

PCO-06 Concrete wall at UV channel $11,357.25 Recommended for approval and payment contingent on including a credit for the omitted frost barrier in the sum of $2,250 resulting in an adjusted sum of $9,107.25.
PCO-12 Transfer beam at the treatment building $2,013.60 There is general consensus that the scope of work was required and Worth & Company, Inc. was instructed to proceed. The purchase order request to the Authority should be withdrawn. Worth & Company, Inc. is recommended to address the cost directly with Pennoni Associates, Inc.
PCO-13 Modification to Roof Steel at Screen and Treatment Building Control Joints $4,499.12 There is general consensus that the scope of work was required and Worth & Company, Inc. was instructed to proceed. The purchase order request to the Authority should be withdrawn. Worth & Company, Inc. is recommended to address the cost directly with Pennoni Associates, Inc.

In addition to the items listed, we recommend that Worth & Company provide the Authority with a credit towards modifying the installation of the frost barrier within the treatment building. The installation of the frost barrier sheathing has been modified and will result in a reduction of labor and construction schedule. A proposed credit in the sum of $9,000.00 is suggested.

We also recommend that Worth & Company, Inc. confirm that no additional days beyond June 30, 2010 substantial completion date are required.

Lastly, as a follow up to the Authority's October 22, 2009 letter, Worth & Company should provide the Authority a letter addressing the following items:

  1. Credit for PCO-2
  2. Credit for PCO-10
  3. Credit of $20,000
  4. Credit of $50,000 towards paving

[Handwritten note in top right: 3 of 3]

Very truly yours,
Artesian Utility Development, Inc/Brickhouse Environmental, Inc.

Scott A. Towler, P.E.
Project Manager

Cc: Mark Miller, East Goshen
Evan R. Andrews, P.E., Pennoni Associates, Inc.
Frank Ciufo, P.E., Pennoni Associates, Inc.
Matthew McAloon, Pennoni Associates, Inc.
Dave W. Evans, P.E., Brickhouse Environmental

[Handwritten note in top right: 2. RIDLEY CREEK d. 1 pg]

Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com

November 23, 2009

Mr. Dan Postlewaite
Pennoni
One Drexel Plaza
3001 Market Street
Philadelphia, PA 19104

Re.: Ridley Creek Sewage Treatment Plant Upgrade & Expansion
Pennoni Project# EGMA 0707
Additional Openings in the SBR Handrail w/ Alt. Closures
PCO-15 Alt 2

Dear Mr. Postlewaite,

Please find attached our cost estimate sheet showing our additional cost of Four Thousand Four Hundred Ninety Four Dollars and fifty-two cents ($4,494.52) to supply the materials, equipment and labor required to add openings in the SBR interior handrail with alternate closure options. Direction was provided from Pennoni Associates.

An extension of time of twenty-one (21) days is required.

This change proposal covers only the direct cost associated with the change order work described above. We reserve the right to assess the impact of this change order at a later date and to submit these costs as they become known.

Please issue a change order for this work as soon as possible.

If you should have any questions or require additional information please do not hesitate to contact me.

Sincerely,

[Signature: Jordan Evans]

Jordan Evans
Project Engineer

Cc: File
Jeff Bush, Worth and Company
Fred Papiernik, Worth and Company
Frank Ciufo, Pennoni

[Handwritten note at bottom right: 8 openings Recomnd for Approval [Signature: MSM]]

[Handwritten note in top right: 2 RIDLEY CREEK REPORT e. 2 pgs]

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

November 4, 2009

EGMA0707/05

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: RCSTP Upgrade and Expansion
Continued Construction Services

Dear Mr. Smith:

As discussed, Pennoni "capped" our billings for the construction phase of this project as agreed with the Authority on May 11, 2009 until the original contracted completion date of November 13, 2009. In the event that the construction continued past November 13, 2009, Pennoni was permitted to resume invoicing effort incurred after November 13 until the project is completed (substantial completion currently scheduled for June 30, 2010). It is assumed that final completion will be reached approximately 30 days later.

SCOPE OF WORK

Construction Observation: We will continue to provide Matt McAloon for construction observation during active construction to confirm that the Contractors' work conforms to the plans and specifications. We anticipate that the average weekly inspection time will be approximately 20 hours per week (down from 25 during the previous year) and continue for approximately 32 weeks (to June 30, 2010). During the period between substantial completion to final completion, we anticipate an additional 60 hours of construction observation effort. The total estimated construction observation effort is therefore 700 hours.

Project Administration: We will continue to respond to contractor requests for information, review submittals and pay requests, and conduct bi-weekly progress meetings. We anticipate that the average monthly effort for project administration will be approximately 40 hours per month for approximately 9 months (to July 30, 2010 – final completion).

System Start-Up: Witness the start-up and testing of installed equipment (wastewater screen, influent pump station, SBRs (at intermediate phase and final completion), cloth filters, and centrifuge. Start-up and testing will be performed by the Contractors and equipment suppliers (96 hours).

Contractor Changes: We will respond to contract changes (either as a result of conditions uncovered in the field or proposed improvement to the project or schedule) as authorized by the Authority. We propose an allowance of $7,500.00 to cover this effort if so authorized.

One Drexel Plaza • 3001 Market Street • Philadelphia, PA 19104-2897 • Tel: 215-222-3000 • Fax: 215-222-3588
www.pennoni.com

[Handwritten note in top right: 2 of 2]

EGMA0707/05
November 4, 2009
Page 2
Rick Smith
Continued Construction Services

ESTIMATED FEE

Our estimated fee for the above scope of work and project duration, to be billed on a time and material basis, is $99,700.00. The work will be done on an hourly basis at our standard rates established in our Engineering Services Agreement.

Should you have any questions or need additional information, please do not hesitate to call.

Very truly yours,

PENNONI ASSOCIATES INC.

[Signature: Evan R. Andrews]

Evan R. Andrews, P.E.
Authority Engineer

RCSTP Continued Construction Services (11-04-2009)

[Watermark: COPY]

[Handwritten note in top right: 3. RIDLEY CREEK INVOICES a. 1 pg]

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

Page: 1
10/31/2009
Client No: 6604-06M
Statement No: 74709

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

[Circled: Ridley Creek Treatment Plant Upgrades/ Expansion]

Fees

Date / Initials Description Hours Amount
10/06/2009
RFA
Review Dutchland extended warranty provisions and Worth contract warranty language. 0.60
10/08/2009
RFA
Telephone conference with Rick Smith regarding Worth-Dutchland settlement proposal. 0.30
10/09/2009
RFA
Review message from Joe McCawley commenting on North/Dutchland proposal; review message from Rick Smith responding to McCawley. 0.60
For Current Services Rendered 1.50 285.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 1.50 $190.00 $285.00
Total Current Charges 285.00
Balance Due $285.00

[Handwritten note: OK RS 11-10-09]

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

3. RIDLEY CREEK INV
3 pgs

Brickhouse Environmental
Consultants and Engineers

2009 DEC 7 PM 12 40

Invoice number 5090
Date 12/1/2009

Client ID: 548

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering

Attn: Mr. Rick Smith, Township Manager

SEE PROJECT ACCOMPLISHMENTS ATTACHED.

Professional Services Rendered Through the Month of November 2009.

Labor

Employee Type Hours Amount
Project Manager 69.25 7,963.75
Labor Total 69.25 7,963.75
Reimbursable Amount
Expense Total 0.00
Invoice Total 7,963.75

ok
RS
12/9

Payment Terms: Net Thirty (30) Days; Credit Cards Accepted

515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com

When Creativity & Experience Count

2 of 3

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule

The original budget estimate assumed commencing the first week of May. Week 1 actually commenced 28-April-2009 (week ending 30-April). The schedule reflects this change for monthly comparison based on the agreed $115.00 hourly rate.

Week Ending DateWeek Ending LabelEstimated Project ManagementEstimated Cumulative HoursEstimated Cumulative FeesEstimated Monthly FeesActual Totals Project ManagementActual Totals Cumulative HoursActual Totals Cumulative FeesActual Totals Monthly Fees
30-Apr-09Week 1 (3 days)00$0$018.518.5$2,127.50$2,127.50
3-May-09Week 1 (2 days)4848$5,520
10-May-09Week 25098$11,270
17-May-09Week 320118$13,570
24-May-09Week 420138$15,870
31-May-09Week 520158$18,170$18,17073.592.0$10,580.00$8,452.50
7-Jun-09Week 620178$20,470
14-Jun-09Week 720198$22,770
21-Jun-09Week 820218$25,070
28-Jun-09Week 920238$27,370
30-Jun-09Week 10 (2 days)8246$28,290$10,12067.8159.8$18,371.25$7,791.25
5-Jul-09Week 10 (3 days)12258$29,670
12-Jul-09Week 1120278$31,970
19-Jul-09Week 1220298$34,270
26-Jul-09Week 1324322$37,030
31-Jul-09Week 1424346$39,790$11,50081.0240.8$27,686.25$9,315.00
9-Aug-09Week 1524370$42,550
16-Aug-09Week 1624394$45,310
23-Aug-09Week 1724418$48,070
30-Aug-09Week 1824442$50,830
31-Aug-09Week 19 (1 day)4446$51,290$11,50067.5308.3$35,448.75$7,762.50
6-Sep-09Week 19 (4 days)20466$53,590
13-Sep-09Week 2024490$56,350
20-Sep-09Week 2124514$59,110
27-Sep-09Week 2224538$61,870
30-Sep-09Week 23 (3 days)16554$63,710$12,42064.5372.8$42,866.25$7,417.50
4-Oct-09Week 23 (2 days)8562$64,630
11-Oct-09Week 2424586$67,390
18-Oct-09Week 2524610$70,150
25-Oct-09Week 2624634$72,910
31-Oct-09Week 2724658$75,670$11,96061.5434.3$49,938.75$7,072.50
8-Nov-09Week 2824682$78,430
15-Nov-09Week 2924706$81,190
22-Nov-09Week 3020726$83,490
29-Nov-09Week 3120746$85,790
30-Nov-09Week 32 (1 day)4750$86,250$10,58069.3503.6$57,902.50$7,963.75
6-Dec-09Week 32 (4 days)20770$88,550
13-Dec-09Week 3324794$91,310
20-Dec-09Week 3420814$93,610
27-Dec-09Week 3520834$95,910
31-Dec-09Week 36 (4 days)16850$97,750$11,500
3-Jan-10Week 36 (1 day)4854$98,210
10-Jan-10Week 3720874$100,510

092532.50/Schedule.xls

Page 1 of 2

3 of 3

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule

The original budget estimate assumed commencing the first week of May. Week 1 actually commenced 28-April-2009 (week ending 30-April). The schedule reflects this change for monthly comparison based on the agreed $115.00 hourly rate.

Week Ending Estimated Actual Totals
Project Management Cumulative Hours Cumulative Fees Monthly Fees Project Management Cumulative Hours Cumulative Fees Monthly Fees
17-Jan-10 Week 38 20 894 $102,810
24-Jan-10 Week 39 24 918 $105,570
31-Jan-10 Week 40 24 942 $108,330 $10,580
7-Feb-10 Week 41 24 966 $111,090
14-Feb-10 Week 42 24 990 $113,850
21-Feb-10 Week 43 24 1,014 $116,610
28-Feb-10 Week 44 20 1,034 $118,910 $10,580
7-Mar-10 Week 45 20 1,054 $121,210
14-Mar-10 Week 46 20 1,074 $123,510
21-Mar-10 Week 47 20 1,094 $125,810
28-Mar-10 Week 48 20 1,114 $128,110
31-Mar-10 Week 49 (3 days) 16 1,130 $129,950 $11,040
4-Apr-10 Week 49 (2 days) 8 1,138 $130,870
11-Apr-10 Week 50 24 1,162 $133,630
18-Apr-10 Week 51 24 1,186 $136,390
25-Apr-10 Week 52 24 1,210 $139,150
30-Apr-10 Week 53 24 1,234 $141,910 $11,960
9-May-10 Week 54 20 1,254 $144,210
16-May-10 Week 55 20 1,274 $146,510
23-May-10 Week 56 20 1,294 $148,810
30-May-10 Week 57 20 1,314 $151,110
31-May-10 Week 58 (1 day) 4 1,318 $151,570 $9,660
6-Jun-10 Week 58 (4 days) 16 1,334 $153,410
13-Jun-10 Week 59 20 1,354 $155,710
20-Jun-10 Week 60 20 1,374 $158,010
27-Jun-10 Week 61 20 1,394 $160,310
30-Jun-10 Week 62 (3 days) 12 1,406 $161,690 $10,120
4-Jul-10 Week 62 (2 days) 8 1,414 $162,610
11-Jul-10 Week 63 20 1,434 $164,910
18-Jul-10 Week 64 24 1,458 $167,670
25-Jul-10 Week 65 24 1,482 $170,430
31-Jul-10 Week 66 20 1,502 $172,730 $11,040
8-Aug-10 Week 67 20 1,522 $175,030 $2,300

092532.50/Schedule.xls

Page 2 of 2

5. MINUTES
4 pgs

EAST GOSHEN TOWNSHIP
MUNICIPAL AUTHORITY MEETING MINUTES
November 9, 2009

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, November 9, 2009 at 7:00 PM at the East Goshen Township building. Members in attendance were: Chairman Fran Beck, Jack Yahraes, and Dana Pizarro. Also in attendance were: Township Manager Rick Smith, Public Works Manager Mark Mill, Dave Evans from Brickhouse Environmental, Authority Engineer Evan Andrews, Meghann Hedgecock from the Planning Commission and Carmen Battavio from the Board of Supervisors.

COMMON ACRONYMS:

MA – Municipal Authority I&I – Inflow & Infiltration
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
PC – Planning Commission LCSTP – Lockwood Chase Sewer Treatment Plant
CB – Conservancy Board DEP – Department of Environmental Protection
PR – Park & Recreation Board EPA – Environmental Protection Agency
BOS – Board of Supervisors PHMC – Pennsylvania Historical Museum Commission
NPDES – National Pollutant Discharge Elimination System

1. CALL TO ORDER

The meeting was called to order at 7:00pm and Fran led those present in the Pledge of Allegiance.

2. RECORDING MEETINGS

-Fran announced that the recording secretary would be digitally recording this meeting and that the recording will be erased upon approval of the final minutes. Fran also asked if anyone in attendance was planning to record this meeting.

3. RCSTP REPORT

No new activity was reported for the Influent Meter Vault. During the week of October 26th, Worth worked on installing the pump rails for the influent pumps in the wet well of the Influent Lift Station. No change in status was noted in the valve vault. There was also no change in status in Manhole Number 1 or the Storm Water Bio retention pool adjacent to Manhole number 1.

Masonry block was completed in the screen building during the week of October 14th. In addition the installation of the roof trusses was completed.

No change in status was recorded for the Influent Force Main to the SBR’s. Pressure testing of the butterfly valve and gate valve adjacent to the SBR tank is planned once all the valves and piping are installed. The knife valves on SBR tank # 3 and 4 for the Effluent Discharge Main were installed. The installation of the effluent decant manifold piping has also begun. The contractors are in the process of installing all of the piping. The Effluent Collection Box was removed and reinstalled at a lower elevation on October 20th.

In reference to the SBR basins, a letter dated October 22nd was issued from the Authority to Worth and Company adjusting the date of substantial completion to June 30, 2010.

MA Minutes 11/09/2009

Page 1 of 4

2 of 4

On October 29th, piping and fusing machine was delivered to the treatment building. The bond beam located within the treatment building walls adjacent to the transition between SBR tank and treatment building was installed after the wall and roof beams were constructed. Worth and Company had their sub-contractor removed previously installed block, install the bond beam, then re-install the block wall.
Evan added that the mason forgot some material in the foundation and the addition of the beam should support as needed.

Installation of electrical conduit under the floor slab of the treatment building has been completed. On October 22nd, the main electrical disconnect enclosure was delivered to site and set in place. Also on this day, the electrical wires from the generator to the new transformer were installed.

4. RCSTP INVOICES

  1. Pennoni – Inv. #422066, 10/30/09 - $6,577.00. Jack moved to approve payment to Pennoni in the amount of $6,577.00 for RSCTP expansion project. Dana seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.
  2. Brickhouse Enviromental, 10/30/2009- $ 7,072.50. Jack moved to approve payment to Brickhouse Enviromental for the RCSTP expansion in the amount of $ 7,075.50. Dana seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.

5. APPROVAL OF MINUTES

The minutes of October 12, 2009 were reviewed. Jack moved that the minutes of October 12, 2009 be approved as corrected. Dana seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.

6. ENGINEERING REPORT

– Evan reported that construction phase services continue as planned and include progress meeting with the contractors and Township every other Thursday, observation services continue including coordination and communication with Brickhouse and the Township, receipt, review and return of contractor submittals, along with negotiation and approval of payment requests are also taken care of at these meetings.

Ridley Creek hydraulic model development has begun with a draft report to be presented to the Township in 10 days. The final report is due to the DEP by December 1, 2009 per the CO & A.

In reference to Chapter 94 reporting, a second letter dated September 30th was received from the DEP regarding the annual report for the Lockwood Chase STP. DEP comments are focused on plant and flow measurements. A response was submitted to the DEP on October 26th, 2009. The DEP is requiring additional metering in all sanitary sewage collection systems. The recommendation is to identify location in the township-wide collection system that can be cost effectively metered in order to comply.

Evan added that billing is to resume and continued services will proceed with no differences. The scope of work will remain the same. The estimated fee is $99,700. Jack noted that he would prefer for Mike and Joe to be present and if possible would like to wait until the

MA Minutes 11/09/2009

Page 2 of 4

3 of 4

December MA meeting to approve. Rick noted that in order for Evan to continue, a decision should be made now.

Jack made a motion to authorize our engineer to continue to provide his services to use until such time to formalize this. Dana seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.

7. APPROVAL OF INVOICES

  1. Pennoni – Inv. #422065, 10/30/09 - $1,384.00. Jack moved to approve payment to Pennoni in the amount of $1,384.00 for RSCTP expansion project. Dana seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.
  2. Pennoni – Inv. #422064, 10/30/09 - $303.75. Dana moved to approve payment to Pennoni in the amount of $303.75 for RSCTP expansion project. Jack seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.
  3. Pennoni – Inv. #422063, 10/30/09 - $1,860.00. Dana moved to approve payment to Pennoni in the amount of $1,860.00 for RSCTP expansion project. Jack seconded the motion. No further discussion or public comment was heard. The motion passed unanimously.
  4. Pennoni – Inv. #422062, 10/30/09 - $956.50. Dana moved to approve payment to Pennoni in the amount of $956.50 for the RSCTP expansion project. Jack seconded the motion No further discussion or public comment was heard. The motion passed unanimously.
  5. Pennoni – Inv. #422061, 10/30/09 - $767.75 Dana moved to approve payment to Pennoni in the amount of $767.75 for the RSCTP expansion project. Jack seconded the motion No further discussion or public comment was heard. The motion passed unanimously.
  6. Gawthrop Greenwood, PC – 9/30/09 - $643.02. Dana moved to approve payment to Gawthrop Greenwood in the amount of $643.02 for General Authority Services. Jack seconded the motion No further discussion or public comment was heard. The motion passed unanimously.

8. LIAISON REPORTS

Meghann Hedgecock, PC –reported that Clearview re-opened a conditional use/residential variance.

9. FINANCIAL REPORT

Rick reviewed the financial report briefly in Mike’s absence.

10. SEWER REPORTS

Routine maintenance continues. See reports for further information.

11. PUBLIC COMMENT – none

12. ADJOURNMENT

MA Minutes 11/09/2009

Page 3 of 4

4 of 4

Jack moved that the meeting adjourn. Dana seconded the motion. No further discussion or public comment was made. The motion carried unanimously. The meeting adjourned at 8:42 PM.

Respectfully submitted by: ____________________________________
Linda Jones, Recording Secretary

MA Minutes 11/09/2009

Page 4 of 4

6. ENGINEER’S REPORT
a.
2 pgs

Pennoni

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Evan R. Andrews, P.E.
Authority Engineer
DATE: December 8, 2009
SUBJECT: Engineer’s Report

RCSTP Upgrade and Expansion

  • Construction phase services continue including: progress meetings with the Contractors and Township every other Thursday; observation services continue including coordination and communication with Brickhouse and the Township; receipt, review, and return of Contractor submittals; negotiation, review, and approval of Payment Requests.
  • Current Project Schedule anticipates substantial completion in June 2010.

I/I Metering Project

  • Metering at the intersection of Saratoga Drive and Paoli Pike and Tallmadge Drive and Paoli Pike has been recommended. The sewers upstream of these two locations run parallel to Ridley Creek. The goal of this metering is to locate the part(s) of the collection system upstream that might be the source of continuous flow observed at the Chester Road meter.
  • It was also recommended that the location of the Towne Drive meter to the Ridley Creek Interceptor be relocated immediately upstream of the 8-inch sewer from Achom Drive. This location will be a substitute for the 2009 Paoli Pike East metering since the 8-inch diameter Paoli Pike East line does not appear to have any significant I/I problems.

RCSTP System Hydraulic Characterization

  • Ridley Creek hydraulic model was completed and submitted to the DEP on November 16, 2009, ahead of the CO&A due date of December 1, 2009 per the CO&A.
  • The model was run for four different flow scenarios: (1) Current Dry Weather; (2) Current Wet Weather; (3) Future Dry Weather; and (4) Future Wet Weather. “Future” was defined as including: completion of the RCSTP upgrade and expansion; the planned elimination of the LCSTP; Diversion of the Hershey Mill, Reserve and Marydell Pump Stations; and the West Goshen Diversion.
  • The model indicates that all sewers within the RCSTP service area have adequate capacity to convey current and future dry and wet weather flows, even in the highly conservative scenario in which all peak wet weather flows at the various 2008 metering locations occur at exactly the same time.

LM03 05/2002

2 of 2

  • It is acknowledged that the Ridley Creek Interceptor has experienced SSOs upstream of the RCSTP. This is believed to be caused by peak wet weather flows exceeding the capacity of the existing influent pump station when the equalization tank is full and recycling flow back to the pump station. The new pump station will have a capacity three times that of the existing pump station which is expected to eliminate these SSOs.

Ridley Creek Consent Order

  • Flow meters to be set by the Township at the locations noted above under “I/I Metering Project”.
  • The next deadline is the Semi-Annual Report due March 31, 2010.

Chapter 94 Reporting

  • DEP is requiring additional metering in all sanitary sewage collection systems including East Goshen. Our recommendation is to identify locations in the township-wide collection system that can be cost-effectively metered in order to comply with the requirements of Chapter 94 and propose such locations to DEP with the Annual Report due March 31, 2010.
  • Chapter 94 also requires that all STPs receiving 100,000 gpd or more have influent meters by January 1, 2010. A meter is included in the RCSTP upgrade and expansion but will likely not be on-line by this date. It will therefore be necessary to place a temporary meter at the RCSTP until the permanent meter is operational, possibly in March.

West Goshen Diversion Project

  • A memo summarizing the identification and evaluation of diversion locations from the Chester Creek collection system to the Ridley Creek collection system has been prepared. The conclusion is that a “slip-stream” diversion is the most cost-effective alternative.
  • The Township Manager has advised West Goshen of the planning effort to divert approximately 300,000 gpd from their Chester Creek STP as well as the Hershey Mill, Reserve and Marydell pump station diversions. A response has not been received.

LCSTP and Pump Station Diversion Planning

  • DEP is requiring a “Plot Plan” to be included in the final submittal of the Act 537 Plan Update Revision. Our original proposal excluded surveying with the understanding that existing mapping would be adequate for the PADEP’s needs. We have been informed that the existing mapping is not acceptable.
  • We have contacted DEP and confirmed that the additional surveying is eligible for Grant Funding upon DEP receipt and approval of an amended Task Activity Report (TAR) including the survey effort. An amended TAR will therefore be prepared and submitted to DEP.
  • Upon authorization of the surveying effort by the Authority, the survey can be completed in approximately 2 to 3 weeks. The revised planning documents would then be ready for review/approval of West Goshen and the Township through resolutions of adoption in January.

LM03 05/2002

12/08/2009 17:25 FAX
7. INVOICES
002

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 424688
Invoice Date : 11/24/2009
Project : EGMA0703
Project Name : LCSTP Decommissioning Planning

For Services Rendered through: 11/15/2009

Prepare responses to DEP including Plot Plan requirements. Survey of connection between the Lockwood Chase sewer and the sewer on Tanglewood Drive is required by DEP.

Phase : 02 – Act 537 Plan Update

Labor : 511.50
Expense : 0.00
Total Phase : 02 – Act 537 Plan Update Phase Total : 511.50
Amount Due This Invoice $511.50
Fee : 23,700.00
Prior Billings : 18,425.75
Current Billings : 511.50
Total Billings : 18,937.25

Phase : 02 – Act 537 Plan Update

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.00 105.00 210.00
Graduate Engineer 4.50 67.00 301.50
Labor Total: 6.50 511.50
Total Phase : 02 – Act 537 Plan Update Labor : $511.50
Expense : $0.00
Total Project : EGMA0703 – LCSTP Decommissioning Planning Labor : $511.50
Expense : $0.00

ok
RS
12/9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

12/08/2009 17:26 FAX 003

East Goshen Municipal Authority
EGMA0703 Invoice Summary
Invoice Date 11-24-2009

Project: LCSTP Decommissioning Planning
Pennoni Job No.: EGMA0703
Invoice No: 424688
Invoice Period: 10/19/2009 to 11/15/2009
Initial Authorization: $ 23,700.00 Date: 5/14/2007
Changes: $ - Date:
Contract Amount: $ 23,700.00
Previously Invoiced: $ 18,425.75
Current Invoice: $ 511.50
Invoiced to Date ($): $ 18,937.25
Invoiced to Date (%): 80%
Remaining Budget ($): $ 4,762.75
Remaining Budget (%): 20%

Budget by Phase:

Phase No. 01
DEP Coordination
02
Act 537 Plan Update
Phase Budget: $ 3,700.00 $ 20,000.00
Previously Invoiced: $ 2,583.75 $ 15,842.00
Current Invoice: $ - $ 511.50
Invoiced to Date ($): $ 2,583.75 $ 16,353.50
Invoiced to Date (%): 70% 82%
Remaining Budget ($): $ 1,116.25 $ 3,646.50
Remaining Budget (%): 30% 18%

Comments: Prepare responses to DEP including Plot Plan requirements. Survey of connection between the Lockwood Chase sewer and the sewer on Tanglewood Drive is required by DEP.

12/08/2009 17:26 FAX 004

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 424689
Invoice Date : 11/24/2009
Project : EGMA0704
Project Name : Pump Station Special Study

For Services Rendered through: 11/15/2009

Prepare responses to DEP including Plot Plan requirements. Per DEP; survey of connection between the Hershey Mill force main and the Cornwallis Drive sewer; and between the Reserve Pump Station across private property and Forest Lane to the sewer at Ridley Creek; is required.

Phase : 01 – Planning Study

Labor : 662.25
Expense : 0.00
Total Phase : 01 – Planning Study Phase Total : 662.25
Amount Due This Invoice $662.25
Fee : 14,000.00
Prior Billings : 10,498.75
Current Billings : 662.25
Total Billings : 11,161.00

Phase : 01 – Planning Study

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.00 105.00 210.00
Graduate Engineer 6.75 67.00 452.25
Labor Total: 8.75 662.25
Total Phase : 01 – Planning Study Labor : $662.25
Expense : $0.00
Total Project : EGMA0704 – Pump Station Special Study Labor : $662.25
Expense : $0.00

ok
RS
12/9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

12/08/2009 17:26 FAX 005

East Goshen Municipal Authority
EGMA0704 Invoice Summary
Invoice Date 11-24-2009

Project: Hershey Mill and Reserve Pump Station Diversion Special Planning Study
Pennoni Job No.: EGMA0704
Invoice No: 424689
Invoice Period: 10/19/2009 to 11/15/2009
Initial Authorization: $ 14,000.00 Date: 7/9/2007
Changes: $ - Date:
Contract Amount: $ 14,000.00
Previously Invoiced: $ 10,498.75
Current Invoice: $ 662.25
Invoiced to Date ($): $ 11,161.00
Invoiced to Date (%): 80%
Remaining Budget ($): $ 2,839.00
Remaining Budget (%): 20%

Budget by Phase:

Phase No. 01
Act 537 Special Study
02
Meetings Allowance
Phase Name: $ 12,500.00 $ 1,500.00
Phase Budget: $ 10,498.75 $ -
Previously Invoiced: $ 662.25 $ -
Current Invoice: $ 11,161.00 $ -
Invoiced to Date ($): 89% 0%
Invoiced to Date (%): $ 1,339.00 $ 1,500.00
Remaining Budget ($): 11% 100%

Comments: Prepare responses to DEP including Plot Plan requirements. Per DEP; survey of connection between the Hershey Mill force main and the Cornwallis Drive sewer; and between the Reserve Pump Station across private property and Forest Lane to the sewer at Ridley Creek; is required.

12/08/2009 17:26 FAX 006

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Philadelphia, PA
215-222-3000 Fax: 215-222-3588

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 424694
Invoice Date : 11/24/2009
Project : EGMA0903
Project Name : RCSTP Sewer Modeling

For Services Rendered through: 11/15/2009

Development of hydraulic model, dry and wet-weather analysis, future flow analysis, and report writing. Report was reviewed by the Township and subsequently submitted to DEP ahead of the CO&A compliance date. Remaining effort associated with preparation of next semi-annual report in March 2010.

Phase : **** – Professional Services

Labor : 11,265.00
Expense : 0.00
Total Phase : **** – Professional Services Phase Total : 11,265.00
Amount Due This Invoice $11,265.00
Fee : 28,300.00
Prior Billings : 14,070.00
Current Billings : 11,265.00
Total Billings : 25,335.00

Phase : **** – Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 10.50 105.00 1,102.50
Senior Engineer 1.75 97.00 169.75
Project Engineer 46.50 90.00 4,185.00
Associate Engineer 60.25 77.00 4,639.25
Engineering Technician I 20.50 57.00 1,168.50
Labor Total: 139.50 11,265.00
Total Phase : **** – Professional Services Labor : $11,265.00
Expense : $0.00
Total Project : EGMA0903 – RCSTP Sewer Modeling Labor : $11,265.00
Expense : $0.00

ok
RS
12/9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

12/08/2009 17:26 FAX 007

East Goshen Municipal Authority
EGMA0903 Invoice Summary
Invoice Date 11-24-2009

Project: RCSTP Sewer Modeling
Pennoni Job No.: EGMA 0903
Invoice No: 424694
Invoice Period: 10/19/2009 to 11/15/2009
Initial Authorization: $ 28,300.00 Date: 9/17/2009
Changes: $ - Date:
Contract Amount: $ 28,300.00
Previously Invoiced: $ 14,070.00
Current Invoice: $ 11,265.00
Invoiced to Date ($): $ 25,335.00
Invoiced to Date (%): 90%
Remaining Budget ($): $ 2,965.00
Remaining Budget (%): 10%

Budget by Phase:

Phase No. RCSTP Sewer Modeling
Phase Name: $ 28,300.00
Phase Budget: $ 14,070.00
Previously Invoiced: $ 11,265.00
Current Invoice: $ 25,335.00
Invoiced to Date ($): 90%
Invoiced to Date (%): $ 2,965.00
Remaining Budget ($): 10%

Comments: Development of hydraulic model, dry and wet-weather analysis, future flow analysis, and report writing. Report was reviewed by the Township and subsequently submitted to DEP ahead of the CO&A compliance date. Remaining effort is associated with preparation of the next semi-annual report in March 2010.

COPY

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
10/31/2009
Client No: 6604-01M
Statement No. 74708

General Authority Services

Fees

Date Description Hours Amount
10/12/2009
RFA
Review packet for Authority meeting of 10/12/09; attend regular meeting of Municipal Authority. 2.50
For Current Services Rendered 2.50 475.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.50 $190.00 $475.00
Previous Balance $643.02
Total Current Charges 475.00
Balance Due $1,118.02

ok RS
11-10-09

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/30/2009
Client No: 6604-01M
Statement No. 75677

General Authority Services

Fees

Date Description Hours Amount
11/16/2009
RFA
Review message from Evan Andrews regarding consent order and agreement with DEP; review system hydraulic characterization report regarding RCSTP. 0.70
11/17/2009
RFA
Review letter from Evan Andrews regarding DEP. 0.30
For Current Services Rendered 1.00 190.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 1.00 $190.00 $190.00
Previous Balance $1,118.02
Total Current Charges 190.00
11/13/2009 Cost Expense Payment -54.02
11/13/2009 Fee Payment -589.00
Total Payments -643.02
Balance Due $665.00

ok
RS
12/9

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

10. GOALS
2 pgs

2009

EAST GOSHEN MUNICIPAL AUTHORITY GOALS
DECEMBER REPORT

ON-GOING

  1. Submit an article for each newsletter. Need by 2/11/08 Mike Completed; Need by 5/13/09 Fran Completed; Need by 8/12/09 Joe Not Completed; Need by 11/9/08 Dana Completed
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (3/4/09) Mike Completed; 2 nd Quarter (6/309) Jack Completed; 3 rd Quarter (9/2/09) Dana Completed; 4 th Quarter (12/2/09) Fran
  3. Respond to capacity requests in 45 days or less. Angelini, 957 Cornwallis Drive 1 EDU - 14 days
  4. Implement I& I Plan – Currently on Schedule
  5. Conduct an annual facilities tour in June. Put on hold until after construction is complete

RIDLEY CREEK PROJECT

Monitor Construction – Excavation and steel complete for SBR slab. SBR panels are currently being poured by Dutchland. Slab poured, commenced excavation for lift station. Lift station installed, Valve Vault installed. SBR panels installed. Poles moved, SBR tank almost completed. Project Manager on board on 4/28. Screen Building under construction. Repairs being done on SBR Walls. Treatment Building under construction. SBR Wall Tank testing in progress. SBR and screen installed. Roof in place, floor poured and wall erected in SBR Treatment Building. SBR equipment installed. Screen Building under roof. Motor control center installed.

ACT 537 PLANNING

  1. Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project – Board of Supervisors scheduled to adopt resolution on 2/17. BoS approved resolution on 3/3/09. Submitted to DEP on 3/5/09. Received 3/26/09 comment letter. Need to provide survey plans for DEP.
  2. Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project Board of Supervisors scheduled to adopt resolution on 2/17. BoS approved resolution on 3/3/09. Submitted to DEP on 3/5/09. Received 3/27/09 comment letter. Need to provide survey plans for DEP. Letter outlining project sent to West Goshen Township.
  3. Obtain Act 537 Plan approval for the Marydell PS Abandonment project. Met with DEP to review project on 2/5. Submitted Task Activity Report to DEP on 2/9/09. Task Activity report approved by DEP on 2/27/09. Need to provide survey plans for DEP. Letter outlining project sent to West Goshen Township.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2009\120409.doc

2 of 2

  1. Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Submitted 2007 Sewer Study to DEP on 2/9/09. Received 3/3/09 comment letter from DEP. Letter outlining project sent to West Goshen Township.

FUNDING

Apply for funding for above projects once Act 537 approval has been obtained. Started preparation of a PA H2O grant for RCSTP. Applied for H2O Grant on 2/11/09. Awarded a grant for $464,195 on 7/14/09.. Submitted executed grant agreement on 11/10/09.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2009\120409.doc

12. NEW BUSINESS
a.
2 pgs

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

December 1, 2009

EGMA0809

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Marydell Pump Station Diversion Project Planning
Amendment for Surveying Services

Dear Mr. Smith:

As we have discussed, the PADEP is requiring a “Plot Plan” to be included in the final submittal of the Act 537 Plan Update Revision for both the Lockwood Chase and Pump Station Diversion planning efforts. It is therefore our expectation that the same will be required of the Marydell Pump Station Diversion. Our original proposal excluded surveying with the understanding that existing mapping would be adequate for the PADEP’s needs. We have been informed that the existing mapping is not acceptable.

The “Plot Plan” for PADEP must include the following items:

  • Existing and proposed buildings. All buildings on the tract and adjacent lots along the proposed route of the sewer (including properties across streets) must be plotted.
  • Lot lines of individual lots and size of lots adjacent to the proposed route of the sewer.
  • Remainder of tract. Any property that is not included in the plan but is under the same ownership and is adjacent to the proposed route of the sewer must be plotted.
  • The point of connection to the existing collection system.
  • Existing utilities.
  • Existing and proposed rights-of-way.
  • Existing buildings, streets, roads, access roads, highways, etc.
  • Open space areas.
  • Wetland areas and flood plain (to be taken from existing mapping).

The plot plans that are prepared will be reused for the design of the diversion and therefore will serve a “dual purpose”. Note also that the surveying is an eligible cost under the PADEP program that provides grants up to 50% of the cost of the Update Revision upon review and acceptance of the completed Update Revision by PADEP.

One Drexel Plaza • 3001 Market Street, 2nd Floor • Philadelphia, PA 19104 • Tel: 215-222-3000 • Fax: 215-222-0384
www.pennoni.com

202

EGMA0809
December 1, 2009
Page 2
Rick Smith
Marydell Pump Station Diversion Surveying

The proposed route of the Marydell Diversion, a gravity sewer, begins at the pump station and runs east under Boot Road parallel to Paoli Pike to the intersection with Tallmadge Drive. The route will then pass under Paoli Pike to the Township sewer on the north side of the intersection. The proposed route is approximately 1,600 ft long.

The survey will include the collection of plan and topographic information for a width of approximately 75 ft wide along the proposed route; locating utilities identified by the PA One-Call System; locating the connection points; plotting the affected and adjacent properties using deed information; and descriptions of the proposed rights of way.

The survey effort will start immediately upon the Authority's authorization and is expected to take approximately two to three weeks to complete (conditions permitting).

Our estimated fee for the surveying, to be billed on a time and material basis, is $6,500.00. The work will be done on an hourly basis at the rates established in our Engineering Services Agreement.

Should you have any questions or need additional information, please do not hesitate to call.

Very truly yours,

PENNONI ASSOCIATES INC.

Evan R. Andrews, P.E.
Authority Engineer

Marydell Surveying Amendment

12. NEW BUSINESS
b.
2 pgs

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

December 1, 2009

EGMA0703

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Lochwood Chase Sewage Treatment Plant (LCSTP) Planning
Amendment for Surveying Services

Dear Mr. Smith:

As we have discussed, the PADEP is requiring a "Plot Plan" to be included in the final submittal of the Act 537 Plan Update Revision. Our original proposal excluded surveying with the understanding that existing mapping would be adequate for the PADEP's needs. We have been informed that the existing mapping is not acceptable.

The "Plot Plan" for PADEP must include the following items:

  • Existing and proposed buildings. All buildings on the tract and adjacent lots along the proposed route of the sewer (including properties across streets) must be plotted.
  • Lot lines of individual lots and size of lots adjacent to the proposed route of the sewer.
  • Remainder of tract. Any property that is not included in the plan but is under the same ownership and is adjacent to the proposed route of the sewer must be plotted.
  • The point of connection to the existing collection system.
  • Existing utilities.
  • Existing and proposed rights-of-way.
  • Existing buildings, streets, roads, access roads, highways, etc.
  • Open space areas.
  • Wetland areas and flood plain (to be taken from existing mapping).

The plot plans that are prepared will be reused for the design and construction of the diversion and therefore will serve a "dual purpose". Note also that the surveying is an eligible cost under the PADEP program that provides grants up to 50% of the cost of the Plan Update upon review and acceptance of the completed Plan Update by PADEP.

The proposed route of the Lochwood Chase Diversion, a gravity sewer, begins at 920/922 Dolphin Drive and heads south between the properties to Township Open Space. From there the route runs between 1547 and 1549 Tanglewood Drive to the Township sewer in the street. The proposed route is approximately 600 ft long. The survey will also include the existing sewer

One Drexel Plaza • 3001 Market Street, 2nd Floor • Philadelphia, PA 19104 • Tel: 215-222-3000 • Fax: 215-222-0384
www.pennoni.com

202

EGMA0703
December 1, 2009
Page 2
Rick Smith
LCSTP Surveying

from 923/926 Dolphin drive to the diversion point (approximately 350 ft) since this sewer will need to be replaced so it drains to the diversion rather than the LCSTP.

The survey will include the collection of plan and topographic information for a width of approximately 75 ft wide along the proposed route; locating utilities identified by the PA One-Call System; locating the connection points; plotting the affected and adjacent properties using deed information; and descriptions of the proposed rights of way.

The survey effort will start immediately upon the Authority's authorization and is expected to take approximately two to three weeks to complete (conditions permitting).

Our estimated fee for the surveying, to be billed on a time and material basis, is $6,000.00. The work will be done on an hourly basis at the rates established in our Engineering Services Agreement.

Should you have any questions or need additional information, please do not hesitate to call.

Very truly yours,

PENNONI ASSOCIATES INC.

Evan R. Andrews, P.E.
Authority Engineer

LCSTP Surveying Amendment

12. NEW BUSINESS
C.
2 pgs

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

December 1, 2009

EGMA0704

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Hershey Mill and Reserve Pump Station Diversion
Amendment for Surveying Services

Dear Mr. Smith:

As we have discussed, the PADEP is requiring a "Plot Plan" to be included in the final submittal of the Act 537 Plan Special Planning Study. Our original proposal excluded surveying with the understanding that existing mapping would be adequate for the PADEP's needs. We have been informed that the existing mapping is not acceptable.

The "Plot Plan" for PADEP must include the following items:

  • Existing and proposed buildings. All buildings on the tract and adjacent lots along the proposed route of the diversion (including properties across streets) must be plotted.
  • Lot lines of individual lots and size of lots adjacent to the proposed route of the diversion.
  • Remainder of tract. Any property that is not included in the plan but is under the same ownership and is adjacent to the proposed route of the diversion must be plotted.
  • The point of connection to the existing collection system.
  • Existing utilities.
  • Existing and proposed rights-of-way.
  • Existing buildings, streets, roads, access roads, highways, etc.
  • Open space areas.
  • Wetland areas and flood plain (to be taken from existing mapping).

The plot plans that are prepared will be reused for the design and construction of the diversion and therefore will serve a "dual purpose". Note also that the surveying is an eligible cost under the PADEP program that provides grants up to 50% of the cost of the Special Planning Study upon review and acceptance of the completed Special Planning Study by PADEP.

The proposed route for the Hersheys Mill Diversion, a force main, begins at the Township force main approximately 5,600 ft downstream from the pump station and heads east under a gas pipeline and Ridley Creek to a point of connection to the existing Township sewer behind 960 Cornwallis Drive. The proposed route is approximately 600 ft long.

One Drexel Plaza • 3001 Market Street, 2nd Floor • Philadelphia, PA 19104 • Tel: 215-222-3000 • Fax: 215-222-0384
www.pennoni.com

202

EGMA0704
December 1, 2009
Page 2
Rick Smith
Pump Station Diversion Surveying

The proposed route of the Reserve Diversion, a gravity sewer, begins at the pump station and runs south through private property on Forest Lane, under Forest Lane and through Township open space along Ridley Creek to an existing Township sewer behind 107/109 Rossmore Drive. The proposed route is approximately 1,070 ft long.

The survey will include the collection of plan and topographic information for a width of approximately 75 ft wide along the proposed route; locating utilities identified by the PA One-Call System; locating the connection points; plotting the affected and adjacent properties using deed information; and descriptions of the proposed rights of way.

The survey effort will start immediately upon the Authority's authorization and is expected to take approximately two to three weeks to complete (conditions permitting).

Our estimated fee for the surveying, to be billed on a time and material basis, is $14,500.00. The work will be done on an hourly basis at the rates established in our Engineering Services Agreement.

Very truly yours,

PENNONI ASSOCIATES INC.

Evan R. Andrews, P.E.
Authority Engineer

PS Diversion Survey Amendment

12. NEW BUSINESS
d.
1 pg

17 East Gay Street, Suite 100, P.O. Box 562 p. 610.696.8225
West Chester, PA 19381-0562 www.gawthrop.com

Gawthrop Greenwood, PC
Attorneys at Law

Robert F. Adams
610.696.8225 x 125
rfadams@gawthrop.com

November 5, 2009

Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199

Re: 2010 Fees For Legal Services

Dear Rick:

Please be advised that Gawthrop Greenwood has no plans to change the rates or the terms of engagement upon which we currently service East Goshen Municipal Authority. Our rates were last adjusted in January of 2009 and we are pleased to have the continuing opportunity to provide legal services to the Municipal Authority in 2010 at our current rates and very much value our long-standing relationship with East Goshen Township and its officials and staff. I would expect that for purposes of budgeting you would be safe in assuming that our experience in 2010 will be similar to the amount of work we did in 2009.

Very truly yours,

Robert F. Adams

RFA/cb

13. SEWER REPORT:
a.
8 pgs

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 7, 2009

To: Municipal Authority

From: Mark Miller

Re: November 2009 Monthly Report

Meter: Meters were recently calibrated. We have installed the portable meters at the locations the Evan requested.
C.C. Collection: The pump stations were visited on a daily basis and the collection baskets were cleaned. We recently cleaned the wet wells, this entailed scraping and pressure washing the walls and vacuuming the grease debris.
We had a couple of problems with electronics at the Hershey Mill Pump Station. I contacted M&S Services and found that the control board was failing and replaced it with one that we had in stock. We televised and cleaned over 6000 feet of pipe. While televising we inspected each lateral, we found 17 laterals that needed some type of repair.
R.C. Collection: The Hunt Country Pumping Station was visited on a daily basis. The wet well was pressure washed and cleaned. No problems to report.
Lochwood Plant: The aerators were brought to the landside and greased. The bar screen was pulled and washed down.
Ridley Creek Plant: The sewer cleaner was utilized to assist the plant operator with cleaning of the weirs. As you know we have hired Frank Walker to process Sludge. We have also addressed Artesian's safety issues as it pertained to eye wash stations and a portable shower. In order to keep the job site clean we put down road milling on the driveway.
PA One Calls: 103 PA One Call's for the month of November.

f:\data\shared data\public works dept\monthly reports\2009 municipal\2009 municipal authority nov. report doc.doc

2 of 8

2008 FLOWMETERS

2009 NOVEMBER 4TH QUARTER

Precip InchesDATEWESTTOWN WAY READINGWESTTOWN WAY GPDELLIS LANE READINGELLIS LANE GPDPAOLI PIKE READINGPAOLI PIKE GPDWILSON DRIVE READINGWILSON DRIVE GPDSUMMIT GPDNET FLOWS
0.0011/01/0920,4000
0.0011/02/091,368,5201,344,00011,051,932124443.336,152,24269,6237,631,27774,17720,4001,075,757
0.0011/03/091,369,8391,319,00011,062,738108060.006,159,79875,5607,639,99287,15020,4001,048,230
0.0011/04/091,371,1041,265,00011,073,763110250.006,167,13373,3507,648,92189,29020,400992,110
0.0311/05/091,372,3811,277,00011,084,382106190.006,175,01878,8507,658,10291,81020,4001,000,150
0.0011/06/091,373,6221,241,00011,094,699103170.006,182,71877,0007,666,44383,41020,400977,420
0.0011/07/0920,4000
0.0011/08/0920,4000
0.0011/09/0920,4000
0.0311/10/091,378,4381,204,00011,134,25898897.506,212,14373,5637,693,05266,52320,400965,018
0.2511/11/091,379,7201,282,00011,144,426101680.006,220,53183,8807,702,42393,71020,4001,002,730
0.0811/12/091,380,9631,243,00011,154,573101470.006,228,85883,2707,711,83194,08020,400964,180
0.1011/13/0920,4000
0.0511/14/0920,4000
0.0011/15/0920,4000
0.0011/16/091,385,9091,236,50011,197,526107382.506,260,40678,8707,740,59271,90320,400978,345
0.0011/17/091,387,0791,170,00011,207,642101160.006,268,81484,0807,749,41988,27020,400896,490
0.0011/18/091,388,3141,235,00011,217,915102730.006,276,86580,5107,758,39889,79020,400961,970
0.5511/19/091,389,4851,171,00011,227,80998940.006,284,37475,0907,766,99886,00020,400910,970
0.0011/20/091,390,7711,286,00011,239,400115910.006,292,71383,3907,776,23992,41020,400994,290
0.0011/21/0920,4000
0.0011/22/0920,4000
0.2511/23/091,394,4661,231,66711,271,342106473.336,316,42679,0437,793,92258,94320,400987,207
0.0011/24/091,395,7161,250,00011,281,26099180.006,325,02786,0107,802,73088,08020,400976,730
0.0811/25/091,396,9221,206,00011,291,469102090.006,332,89778,7007,811,31185,81020,400939,400
0.0011/26/0920,4000
0.0011/27/0920,4000
0.0011/28/0920,4000
0.0011/29/0920,4000
0.2811/30/091,403,0191,219,40011,340,89698854.006,369,23772,6807,840,03457,44620,4001,089,274
20,400
1.701,323,785111,68083,34287,4251,047,517
DAILY LOCINQUIREREG TWP
MONTH TO DATE1.70
NORMAL MONTH TO DATE
YEAR TO DATE60
NORMAL YEAR TO DATE

2007 flowmeters -all-stations separate month worksheets.xls

3 of 8

2008 FLOWMETERS

2009 NOVEMBER 4TH QUARTER

DATEHERSHEY'S MILL READINGHERSHEY'S MILL GPDASHBRIDGE READINGASHBRIDGE GPDHICKS METER READINGHICKS METER GPDRESERVOIR READINGRESERVOIR GPDSHERMAN READINGSHERMAN GPDBARKWAY READINGBARKWAY GPD
11/01/09
11/02/0917,259,39676,703615,891102,8002,088,822308,87377,938,873810,477243,3215,7071,248,83513,437
11/03/0917,266,34869,520616,79990,8002,123,558347,36078,019,288804,150243,8805,5901,249,8269,910
11/04/0917,273,33669,880617,65185,2002,158,828352,70078,100,108808,200244,5957,1501,250,96911,430
11/05/0917,280,07267,360618,46681,5002,194,438356,10078,180,743806,350245,1475,5201,252,09511,260
11/06/0917,286,75166,790619,28281,6002,228,864344,26078,258,565778,220245,6444,9701,253,17010,750
11/07/09
11/08/09
11/09/09
11/10/0917,313,49666,863622,38477,5502,348,118298,13578,553,341736,940247,7955,3781,257,90711,843
11/11/0917,319,98964,930623,16578,1002,384,077359,59078,634,694813,530248,4086,1301,259,12312,160
11/12/0917,326,77367,840623,88872,3002,420,431363,54078,714,253795,590249,0856,7701,260,26711,440
11/13/09
11/14/09
11/15/09
11/16/0917,353,16265,973626,99177,5752,542,742305,77879,016,571755,795251,4735,9701,265,53013,158
11/17/0917,359,19360,310627,71472,3002,575,922331,80079,092,902763,310251,9714,9801,266,57010,400
11/18/0917,365,29861,050628,41970,5002,607,681317,59079,168,046751,440252,4845,1301,267,68911,190
11/19/0917,371,03457,360629,09767,8002,639,461317,80079,241,480734,340253,0355,5101,268,6709,810
11/20/0917,377,06860,340629,88478,7002,672,909334,48079,321,666801,860253,4994,6401,269,85111,810
11/21/09
11/22/09
11/23/0917,396,18063,707632,24478,6672,752,276264,55779,539,160724,980255,1405,4701,273,53912,293
11/24/0917,402,26160,810632,98273,8002,786,217339,41079,616,918777,580255,7105,7001,274,74712,080
11/25/0917,408,71664,550633,68970,7002,820,187339,70079,693,847769,290256,4907,8001,275,98312,360
11/26/09
11/27/09
11/28/09
11/29/09
11/30/0917,444,39171,350637,390123,3672,955,864271,35480,065,519743,344261,2109,4401,282,84822,883
69,70886,454347,064823,4626,36613,013

2007 flowmeters -all-stations separate month worksheets.xls

408

2009 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY 1,277,483 95,426 42,394 63,547 20,400 65,016 67,836 307,570 763,687 6,386 12,279
FEBRUARY 1,211,464 87,515 41,270 60,703 20,400 63,382 62,862 292,756 721,327 5,850 11,963
MARCH 1,152,893 82,510 38,294 56,906 20,400 55,330 61,242 300,092 672,897 5,534 11,410
APRIL 1,273,653 106,236 39,685 58,079 20,400 59,615 77,712 314,679 744,604 6,096 11,541
MAY 1,304,080 106,881 64,480 65,970 20,400 65,744 83,088 343,439 792,633 5,869 11,521
JUNE 1,320,702 112,744 60,869 78,465 20,400 63,152 87,581 341,020 807,211 6,010 11,736
JULY 1,145,310 92,563 64,786 70,508 20,400 57,932 64,481 314,779 706,552 5,990 10,873
AUGUST 1,205,548 104,700 47,158 99,749 20,400 64,338 76,794 722,167 722,167 5,474 10,664
SEPTEMBER 1,145,397 97,724 37,981 79,651 20,400 58,006 72,494 315,816 717,067 5,708 11,321
OCTOBER 1,254,894 107,952 65,329 93,555 20,400 61,365 74,695 339,638 782,375 5,535 11,980
NOVEMBER 1,323,785 111,680 83,342 87,425 20,400 69,708 86,454 347,064 823,462 6,366 13,013
DECEMBER
Total Flows
Monthly Ave 1,237,746 100,539 53,235 74,051 20,400 62,144 74,113 358,093 750,362 5,893 11,664

To
West Goshen   1,009,921

2009 flowmeters -all-stations separate month worksheets.xlsSUMMARY

5 of 8

Flowmeters November 2009

Legend: Series1

Y-Axis (Flow#s): 0, 200000, 400000, 600000, 800000, 1000000, 1200000

X-Axis (Day): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30

6 of 8

Monthly Totals 2009 Jan-Dec

Y-Axis (Flowmeters): 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000, 1600000, 1800000

X-Axis (Month): January, February, March, April, May, June, July, August, September, October, November, December

7 of 8

November Precip. 1.7 - 2009

Legend: November

Y-Axis (Snow/Rain): 0, 0.2, 0.4, 0.6, 0.8, 1, 1.2, 1.4, 1.6, 1.8

X-Axis: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34

8 of 8

Monthly Totals 2009 (Jan-Dec)

Monthly Totals

Precip. 0 1 2 3 4 5 6 7 8 9 10

Month 1 2 3 4 5 6 7 8 9 10 11 12

13. SEWER REPORTS
b.
1 pg.

NOV 18 2009

East Goshen Township Flows
October
2009

Date West Goshen Plant Flow mgd West. Way Pump Station mgd Ellis Lane Meter Pit mgd Paoli Pike Meter Pit mgd Wilson Drive Meter Pit mgd West. Way Meter Pit mgd Total East Goshen Flow mgd
1 4.630 1.512 0.087 0.030 0.088 1.118 0.913
2 4.379 1.467 0.094 0.032 0.061 1.098 0.911
3 4.368 1.439 0.095 0.032 0.061 1.098 0.910
4 4.792 1.495 0.095 0.032 0.061 1.098 0.910
5 4.426 1.408 0.091 0.037 0.077 1.138 0.933
6 4.657 1.438 0.094 0.052 0.099 1.140 0.895
7 4.368 1.400 0.086 0.053 0.087 1.110 0.884
8 4.320 1.447 0.093 0.059 0.099 1.154 0.903
9 4.239 1.391 0.091 0.064 0.081 1.074 0.838
10 4.200 1.393 0.091 0.064 0.081 1.074 0.838
11 4.252 1.441 0.092 0.065 0.082 1.074 0.835
12 4.092 1.435 0.161 0.134 0.202 2.054 1.557
13 4.107 1.384 0.083 0.080 0.106 1.209 0.940
14 4.228 1.418 0.109 0.088 0.105 1.249 0.947
15 5.571 1.591 0.109 0.067 0.064 1.102 0.862
16 4.901 1.689 0.109 0.067 0.064 1.102 0.862
17 7.031 2.072 0.109 0.067 0.064 1.103 0.863
18 6.060 1.954 0.110 0.067 0.064 1.103 0.862
19 5.009 1.620 0.106 0.077 0.103 1.249 0.963
20 5.014 1.539 0.095 0.076 0.096 1.176 0.909
21 4.232 1.534 0.100 0.086 0.095 1.212 0.931
22 4.732 1.513 0.090 0.071 0.094 1.133 0.878
23 4.706 1.508 0.136 0.071 0.073 1.427 1.147
24 6.993 2.424 0.136 0.071 0.073 1.427 1.147
25 6.468 1.812 0.136 0.072 0.073 1.428 1.147
26 5.327 1.649 0.117 0.062 0.092 1.363 1.092
27 6.754 2.335 0.187 0.079 0.112 1.804 1.426
28 7.837 2.360 0.184 0.076 0.099 1.823 1.464
29 5.952 1.874 0.129 0.083 0.092 1.395 1.091
30 5.534 1.739 0.126 0.070 0.075 1.357 1.086
31 5.643 1.782 0.126 0.071 0.075 1.357 1.085
Total 158.82 51.06 3.47 2.06 2.70 39.25 31.03
Avg. 5.123 1.647 0.112 0.066 0.087 1.266 1.001

NOTES:

13. SEWER REPORT
C.
2 pgs

ARTESIAN RESOURCES
100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Maryland

December 8, 2009

Mr. Mark Miller, Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Lochwood Chase Wastewater Treatment Facility
October 2009 Operations Report

Dear Mr. Miller:

The following is the October 2009 monthly operations report for East Goshen Township's Lochwood Chase Wastewater Treatment Facility.

Treatment plant operations were normal during the month of October 2009. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharged during the month was 983,600 gallons, which represents an average daily flow of 31,729 gallons per day.

The influent area operated normally during the month. The comminutor unit was in service continuously and no problems were experienced with the unit's controls. The plant operator continued to remove rags and debris from the housing, clear the bypass bar screen and remove grit from the bottom of the vault on a regular basis. Debris and grit accumulations were disposed of via the trash can.

The aeration pond operated normally during the month. The pond's color was brownish with some light surface scum and duckweed buildup. Both floating aerators continued to be operated in the automatic mode with two (2) OFF cycles per day to minimize noise complaints and over-aeration.

The polishing pond operated normally as well. The pond's color remained greenish due to algae growth and there was a moderate amount of surface duckweed. The level continued to fluctuate with discharge spraying.

The chlorine contact tank and chlorine feed systems were operational throughout the month of October to meet disinfection requirements. Liquid chlorine continued to be added directly to the chlorine contact tank manually prior to each spray cycle to improve disinfection and minimize odor issues.

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Hwy., Unit 4, Milton, DE 19968
e-mail: artesian@artesianwater.com Website: artesianwater.com

2 of 2

The discharge spray system operated properly during the month. The discharge pumps were cycled with each spray event and utilized in the Hand position with sprayfields No. 1 through No. 5 being opened manually to prevent backpressure on the pumps. The plant operator inspected the sprayfields in use to ensure the spray heads were in proper working order.

Results of influent and final effluent samples collected during the month indicate compliance with current permit limitations.

Should you have any questions, please do not hesitate to contact me.

Sincerely,

Artesian Utility Development, Inc.

Thomas M. Horrex, L.O., S.E.O.
Pennsylvania Operations Supervisor

TMH/bmr

cc: Mr. Evan Andrews - Pennoni Associates
    File

13. SEWER REPORT
d.
2 pgs

ARTESIAN RESOURCES
100 YEARS OF SUPERIOR SERVICE
Artesian Water Company • Artesian Wastewater Management • Artesian Utility Development • Artesian Water Maryland

December 8, 2009

Mr. Mark Miller, Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Ridley Creek Wastewater Treatment Facility
October 2009 Operations Report

Dear Mr. Miller:

The following is the October 2009 monthly operations report for East Goshen Township's Ridley Creek Wastewater Treatment Facility.

Treatment plant operations were normal during the month of October 2009. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharged during the month was 8,408,000 gallons, which represents an average daily flow of 271,226 gallons per day.

The operations staff continued to visually inspect the manholes outside of the fence for signs of overflows. Investigation revealed that an overflow occurred as a result of infiltration/inflow from excessive rainfall on October 23, 2009. The Pennsylvania Department of Environmental Protection was immediately notified via telephone and via the Sanitary Sewer Overflow (SSO) reporting form by the licensed operator of the facility. Township personnel cleaned up the debris around the manhole and applied lime to help neutralize the area to correct the situation.

The influent area operated normally during the month except for high level conditions experienced during heavy rainfall events. The muffin monster, both raw lift pumps and associated controls experienced no operational problems.

The flow equalization system operated normally during the month. The Rotomat unit was in service continuously and debris generated by the unit was disposed of via the dumpster. The plant operator continued to remove sand and debris buildups from the bottom of the Rotomat box on a regular basis. The forward flow pumps and associated controls were in service continuously and Soda Ash continued to be added on a daily basis to help control pH values.

The package sewage treatment plant operated normally during the month of October. The aeration tanks were medium brown colored with a moderate amount of tan surface foam buildup. The clarifiers operated normally as well. The plant operator continued to hose and skim the surfaces to remove algae and solids buildups. Sludge wasting

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Hwy., Unit 4, Milton, DE 19968
e-mail: artesian@artesianwater.com Website: artesianwater.com

2 of 2

continued to be accomplished to control the biomass. Weekly samples of the Mixed Liquor Suspended Solids (MLSS) in both aeration tanks revealed the solids concentrations are rising slowly. The sand filters were operational throughout the month with water being used to assist in the lifting of sand. The chlorine contact tank and the ultraviolet light disinfection system were in service continuously during the month.

The belt filter press was operated for two hundred thirty-eight (238) hours during the month of October to dewater approximately two hundred sixty-two thousand (262,000) gallons of waste activated sludge to produce three (3) dumpster loads of dried sludge for disposal.

The Applebrooke subdivision transfer pump was shut off during the month of October. The pump will be left off throughout the winter and not restarted until next spring. It is anticipated that the pump will be relocated into the new treatment plant and the flow meter will be replaced before the system is reactivated.

The operations staff began completing some of the safety issues found during the recent safety audit conducted at the facility this month. These items included marking trip hazards, labeling chemical tanks, installing temporary signage, hanging eye was bottles, hanging life flotation rings and updating the MSDS binders.

The treatment plant expansion / modification project continued during the month. Work involving the operations staff including attending progress meetings, troubleshooting blower vibration issues and monitoring the installation of new equipment.

Results of influent and final effluent samples collected during the month indicate compliance with current permit limitations.

Should you have any questions, please do not hesitate to contact me.

Sincerely,

Artesian Utility Development, Inc.

Thomas M. Horrex, L.O., S.E.O.
Pennsylvania Operations Supervisor

TMH/bmr

cc: Mr. Evan Andrews - Pennoni Associates
    File

15. CORRESPONDENCE
a.
1 pg

November 9, 2009

Mr. Louis (Rick) Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Mark Miller

I am quite late in sending this letter to you, however, it is no less sincere.

I am writing to express my gratitude to Mark Miller, Director of Public Works. In mid September, Mark did a fabulous job in planting trees behind my house, which backs up to the Township's Sewer Treatment Plant. Mark is an outstanding employee and you are fortunate to have such a conscientious individual to represent the Township. Mark knows I am trying to sell my house, and knows the extent of the push back that I am receiving from potential buyers as they could not get past the visual disruption of the Treatment Plant's construction in July, August and September. Mark worked diligently to get the mound of dirt removed and grass/trees planted so that the visual improvement could possibly help to sell my house. On very hot days, Mark met with myself and neighbor, to ensure that the landscaping was effective, consistent and a visual improvement.

Any time that I have contacted Mark about the Treatment Plant, Mark has always been patient, kind and considerate, also returning all phone calls.

Although I have expressed my sincere gratitude to Mark, please accept my words of appreciation and thank you for working with me and my neighbor, Mr/Mrs. Snyder, to plant beautiful trees that will grow and block the Treatment Plant.

Most sincerely,

Jo-Anne Fote
1747 Towne Drive
West Chester, PA 19380
Email: jadf54@aol.com
610-715-3698

FYI [handwritten]
FYI [stamp]

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
November 5, 2009

Southeast Regional Office

Phone: 484-250-5970
Fax: 484-250-5971

NOTICE OF VIOLATION

Mr. Louis F. Smith, Jr.
Township Manager
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Re: Water Management/Sewage/Operations
Hershey Mills Pump Station
East Goshen Township
Chester County

Dear Mr. Smith:

On October 26, 2009, the Department of Environmental Protection (Department) received notification of a sanitary sewer overflow at the Hershey Mill Pump Station in East Goshen Township, Chester County. However, the sanitary sewer overflow occurred on October 24, 2009.

The above-referenced discharge to the waters of the Commonwealth constitutes a violation of Sections 201 and 202 of the Cleans Streams Laws of Pennsylvania, the Act of June 22, 1937, P.L. 1987, as amended. Furthermore, you are in violation of 25 Pa. Code Section 91.33. Immediate notification to this office, in conjunction with containment and cleanup, is required by the Department's regulations in the event of an incident that causes or has the potential to cause such a discharge. These violations constitute unlawful conduct under Section 611 of the Clean Streams Law and subject you to the enforcement provisions of Section 605 of the Clean Streams Law, 35 P.S. Section 691.605, which includes the assessment of civil penalties.

This Notice of Violation is neither an order nor any other final action of the Department. It neither imposes nor waives any enforcement action available to the Department under any of its statutes. If the Department determines that an enforcement action is appropriate, you will be notified of the action.

If you have any questions, please call me at 484-250-5142.

Sincerely,

[signature]
David Wolfinger
Water Quality Specialist
Water Management

cc: Mr. Magge
Compliance and Monitoring
Re 30 (joh09wqm)309-7

An Equal Opportunity Employer

www.dep.state.pa.us

Printed on Recycled Paper

FYI [stamp]

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
November 10, 2009

Southeast Regional Office

Phone: 484-250-5970
Fax: 484-250-5971

NOTICE OF VIOLATION

Mr. Louis F. Smith, Jr.
Township Manager
East Goshen Township Municipal Authority
1580 Paoli Pike
WestChester, PA 19380

Re: Lockwood Chase STP
Permit No. 1580430
East Goshen Township
Chester County

Dear Mr. Smith:

Our records indicate that the Discharge Monitoring Reports (DMRs) required by your National Pollutant Discharge Elimination System (NPDES) Permit or Water Quality Management Permit, No. 1580430, have been submitted late for 12 months out of the last 42 months. Your permit requires the submission of DMRs to this office within 28 days from the end of each monitoring period.

These violations constitute unlawful conduct under Section 611 of the Clean Streams Law and subject you to the enforcement provisions of Section 605 of the Clean Streams Law, 35 P.S. Section 691.605, which includes the assessment of civil penalties.

As part of the Department of Environmental Protection's (DEP) Electronic Government initiative, DEP is offering a new method for wastewater facilities to submit the monthly DMRs and all supplemental forms as required by NPDES permits and some Water Quality Management permits. Permittees can now utilize DEP's electronic DMR (eDMR) system. Upon registration, permittees use an eDMR template generated specifically for their permit to enter parameter values for submission to DEP. The secure website is accessed with a User Identification Number and Password. When permittees utilize the eDMR system, they no longer need to submit paper DMRs to DEP and EPA. All supplemental forms can be uploaded into the eDMR system.

DEP would like to resolve the late DMR submission violations and prevent a recurrence of this type of violation. Therefore, in lieu of the assessment of civil penalties for the late DMR submission violations, DEP is willing to resolve these open violations upon your registration and continued use of DEP's eDMR system. Enclosed is the Department's eDMR fact sheet for additional information. The required registration information and forms can be obtained by accessing the following DEP's website:

http://www.depweb.state.pa.us/watermgmt/cwp/view.asp?a=1465&Q=520789

An Equal Opportunity Employer

www.dep.state.pa.us

Printed on Recycled Paper

Mr. Louis F. Smith, Jr.
- 2 -
November 10, 2009

Within fifteen (15) days of the date of this letter, DEP requests a written response that indicates how you will resolve the late DMR submission violations. Should you choose to utilize DEP's eDMR system, we will also require the submission of a copy of the completed forms that you have submitted within thirty (30) days of the date of this letter.

This letter does not waive, either expressly or by implication, the power or authority of the Commonwealth of Pennsylvania to prosecute for any and all violations of law arising prior to or after the issuance of this letter or the conditions upon which the letter is based.

This letter shall not be construed so as to waive or impair any rights of the DEP, heretofore or hereafter existing.

Sincerely,

[signature]
Robert D. Bauer
Water Quality Specialist Supervisor
Water Management

Enclosure

cc: Compliance and Monitoring
Re 30 (GJS09)302

pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION

Electronic Discharge Monitoring Report (eDMR) System

Overview

As part of DEP's Electronic Government initiative, DEP is offering a new method for wastewater facilities to submit the monthly Discharge Monitoring Reports (DMRs) and all supplemental forms as required by National Pollutant Discharge Elimination System (NPDES) permits and some Water Quality Management permits - permittees can now utilize DEP's electronic DMR (eDMR) system. Upon registration, permittees use an eDMR template generated specifically for their permit to enter parameter values for submission to DEP. The secure Web site is accessed with a User Identification Number and Password. When permittees utilize eDMR, they no longer need to submit paper DMRs to DEP and EPA. All supplemental forms can be uploaded into the eDMR system. A user with authorization as a "Certifier" can submit the monthly package to DEP.

Eligible Types of Permit Holders

  • Water Quality Management Permit, Industrial Waste and Sewage, Land Application
  • NPDES Permit, Industrial Wastewater (Major and Minor)
  • NPDES Permit, Industrial Storm Water (Individual Permits)
  • NPDES Permit, Sewage, Municipal and Non-Municipal (Major and Minor)
  • PAG-03, Stormwater Associated with Industrial Activities
  • PAG-05, Discharges from Gasoline Contaminated Ground Water Remediation Systems
  • PAG-10, Discharges from Hydrostatic Testing of Tanks and Pipelines

Access

The eDMR system is accessed through DEP's Web site at www.dep.state.pa.us/edmr. Access is restricted by authorized security for the following types of accounts:

Viewer - This role enables the user to view reporting requirements, the status of submitted eDMRs and the submitted data.

Preparer - This role provides the user with all privileges of the Viewer role plus the ability to complete and save the eDMR forms.

Certifier - This role provides the user with all privileges of the Viewer and Preparer roles plus the ability to submit eDMRs using a Personal Identification Number (PIN) as part of a digital signature.

Value and Benefits

  • Reduction in paperwork for the facility
  • Reduction in manual data entry by DEP
  • Allows data uploads from proprietory software applications
  • Electronic attachment functionality
  • Electronic receipt of all submissions
  • Track status and history of online submissions
  • Secure, convenient, and easy!

FACT SHEET

FYI [stamp]

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
November 10, 2009

Southeast Regional Office

Phone: 484-250-5970
Fax: 484-250-5971

NOTICE OF VIOLATION

Mr. Louis F. Smith, Jr.
Township Manager
East Goshen Township Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Re: Ridley Creek STP
Permit No. PA0050504
East Goshen Township
Chester County

Dear Mr. Smith:

Our records indicate that the Discharge Monitoring Reports (DMRs) required by your National Pollutant Discharge Elimination System (NPDES) Permit or Water Quality Management Permit, No. PA0050504, have been submitted late for 16 months out of the last 42 months. Your permit requires the submission of DMRs to this office within 28 days from the end of each monitoring period.

These violations constitute unlawful conduct under Section 611 of the Clean Streams Law and subject you to the enforcement provisions of Section 605 of the Clean Streams Law, 35 P.S. Section 691.605, which includes the assessment of civil penalties.

As part of the Department of Environmental Protection's (DEP) Electronic Government initiative, DEP is offering a new method for wastewater facilities to submit the monthly DMRs and all supplemental forms as required by NPDES permits and some Water Quality Management permits. Permittees can now utilize DEP's electronic DMR (eDMR) system. Upon registration, permittees use an eDMR template generated specifically for their permit to enter parameter values for submission to DEP. The secure website is accessed with a User Identification Number and Password. When permittees utilize the eDMR system, they no longer need to submit paper DMRs to DEP and EPA. All supplemental forms can be uploaded into the eDMR system.

DEP would like to resolve the late DMR submission violations and prevent a recurrence of this type of violation. Therefore, in lieu of the assessment of civil penalties for the late DMR submission violations, DEP is willing to resolve these open violations upon your registration and continued use of DEP's eDMR system. Enclosed is the Department's eDMR fact sheet for additional information. The required registration information and forms can be obtained by accessing the following DEP's website:

http://www.depweb.state.pa.us/watermgmt/cwp/view.asp?a=1465&Q=520789

An Equal Opportunity Employer

www.dep.state.pa.us

Printed on Recycled Paper

Mr. Louis F. Smith, Jr
- 2 -
November 10, 2009

Within fifteen (15) days of the date of this letter, DEP requests a written response that indicates how you will resolve the late DMR submission violations. Should you choose to utilize DEP's eDMR system, we will also require the submission of a copy of the completed forms that you have submitted within thirty (30) days of the date of this letter.

This letter does not waive, either expressly or by implication, the power or authority of the Commonwealth of Pennsylvania to prosecute for any and all violations of law arising prior to or after the issuance of this letter or the conditions upon which the letter is based.

This letter shall not be construed so as to waive or impair any rights of the DEP, heretofore or hereafter existing.

Sincerely,

[signature]
Robert D. Bauer
Water Quality Specialist Supervisor
Water Management

Enclosure

cc: Compliance and Monitoring
Re 30 (GJS09)302

pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION

Electronic Discharge Monitoring Report (eDMR) System

Overview

As part of DEP's Electronic Government initiative, DEP is offering a new method for wastewater facilities to submit the monthly Discharge Monitoring Reports (DMRs) and all supplemental forms as required by National Pollutant Discharge Elimination System (NPDES) permits and some Water Quality Management permits - permittees can now utilize DEP's electronic DMR (eDMR) system. Upon registration, permittees use an eDMR template generated specifically for their permit to enter parameter values for submission to DEP. The secure Web site is accessed with a User Identification Number and Password. When permittees utilize eDMR, they no longer need to submit paper DMRs to DEP and EPA. All supplemental forms can be uploaded into the eDMR system. A user with authorization as a "Certifier" can submit the monthly package to DEP.

Eligible Types of Permit Holders

  • Water Quality Management Permit, Industrial Waste and Sewage, Land Application
  • NPDES Permit, Industrial Wastewater (Major and Minor)
  • NPDES Permit, Industrial Storm Water (Individual Permits)
  • NPDES Permit, Sewage, Municipal and Non-Municipal (Major and Minor)
  • PAG-03, Stormwater Associated with Industrial Activities
  • PAG-05, Discharges from Gasoline Contaminated Ground Water Remediation Systems
  • PAG-10, Discharges from Hydrostatic Testing of Tanks and Pipelines

Access

The eDMR system is accessed through DEP's Web site at www.dep.state.pa.us/edmr. Access is restricted by authorized security for the following types of accounts:

Viewer - This role enables the user to view reporting requirements, the status of submitted eDMRs and the submitted data.

Preparer - This role provides the user with all privileges of the Viewer role plus the ability to complete and save the eDMR forms.

Certifier - This role provides the user with all privileges of the Viewer and Preparer roles plus the ability to submit eDMRs using a Personal Identification Number (PIN) as part of a digital signature.

Value and Benefits

  • Reduction in paperwork for the facility
  • Reduction in manual data entry by DEP
  • Allows data uploads from proprietary software applications
  • Electronic attachment functionality
  • Electronic receipt of all submissions
  • Track status and history of online submissions
  • Secure, convenient, and easy!

FACT SHEET

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FYI [stamp]
FILE COPY [stamp]

November 13, 2009

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401

Attention: Mr. Robert D. Bauer
Water Quality Specialist Supervisor
Water Management

Re: Lockwood Chase STP
Permit No. 1580430
East Goshen Township
Chester County

Dear Mr. Bauer:

We are in receipt of your letter dated November 10, 2009 indicating that the Discharge Monitoring Reports (DMRs) required by our National Pollutant Discharge Elimination System (NPDES) Permit or Water Quality Management Permit No. 1580430, have been submitted late for 12 months out of the last 42 months.

East Goshen Township will take immediate steps to rectify the late DMR violations and prevent recurrence of this type of violation. Service for the Lockwood Chase Sewage Treatment Plant is contracted out to Artesian by East Goshen Township. We will notify Artesian of the proper procedure to ensure that going forward these violations do not occur.

We would also ask DEP to provide East Goshen Township with a list of the reports that are in violation so that we may correct the situation.

If you have any questions or need additional information, please do not hesitate to call me at 610-692-7171 or email me at rsmith@eastgoshen.org .

Thank you for your help in this matter.

Sincerely,

[signature]
Louis F. Smith, Jr.
Township Manager

nns

F:\Data\Shared Data\Public Works Dept\Municipal Authority\Lochwood Chase DEP violation 111309.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

November 16, 2009

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401

Attention: Mr. Robert D. Bauer
Water Quality Specialist Supervisor
Water Management

Re: Ridley Creek STP
Permit No. PA00500504
East Goshen Township
Chester County

Dear Mr. Bauer:

We are in receipt of your letter dated November 10, 2009 indicating that the Discharge Monitoring Reports (DMRs) required by our National Pollutant Discharge Elimination System (NPDES) Permit or Water Quality Management Permit No. PA0050504, have been submitted late for 16 months out of the last 42 months.

East Goshen Township will take immediate steps to rectify the late DMR violations and prevent recurrence of this type of violation. Service for the Ridley Creek Sewage Treatment Plant is contracted out to Artesian by East Goshen Township. We will notify Artesian of the proper procedure to ensure that going forward these violations do not occur.

We would also ask DEP to provide East Goshen Township with a list of the reports that are in violation so that we may correct the situation.

If you have any questions or need additional information, please do not hesitate to call me at 610-692-7171 or email me at rsmith@eastgoshen.org .

Thank you for your help in this matter.

Sincerely,

[signature]
Louis F. Smith, Jr.
Township Manager

nns

F:\Data\Shared Data\Public Works Dept\Municipal Authority\RCSTP DEP violation 111609.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FYI [stamp]
FILE COPY [stamp]

November 16, 2009

Thomas M. Horrex, L.O., S.E.O.
Pennsylvania Operations Supervisor
Artesian Wastewater Management
P.O. Box 15004
Wilmington, DE 19850

Re: Ridley Creek STP
Permit No. PA 00500504
East Goshen Township
Chester County

Lochwood Chase STP
Permit No. 1580430
East Goshen Township
Chester County

Dear Mr. Horrex:

Please see enclosed letters from PA DEP to East Goshen Township indicating Discharge Monitoring Reports (DMRs) violations for Lochwood Chase STP and Ridley Creek STP.

Also enclosed you will find the list of bid specs for Ridley Creek and Lochwood Chase STPs for your review. Please note that "all discharge monitoring reports shall be submitted to the DEP by certified return receipt mail."

To avoid these violations and late reporting in the future, permittees can now utilize DEP's electronic DMR (eDMR) system. Instructions are enclosed for registering and participating in the eDMR program. Please confirm that you have registered in the Electronic Discharge Monitoring Report System.

If you have any questions or need additional information please do not hesitate to call me at 610-692-7171 or email me at rsmith@eastgoshen.org .

Sincerely,

[signature]
Louis F. Smith, Jr.
Township Manager

nns

enclosures

F:\Data\Shared Data\Public Works Dept\Municipal Authority\letr to Horrex re DEP violations 111609.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FYI [stamp]

November 25, 2009

Dear Property Owner:

The purpose of this letter is to inform you that the National Bank of Malvern has submitted a Land Development application requesting approval to develop their property located at 1305 Paoli Pike, West Chester PA, 19380. The applicant proposes to construct a bank branch and parking on the property. Parking proposed on the North side of this property will be leased to the YMCA.

Pursuant to Township policy, property owners and residents within 1000 feet of the properties seeking zoning relief; are notified of Zoning Variance applications.

The meeting dates and times when this application will be discussed are outlined below.

December 2, 2009 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm) The applicant will make a presentation at this meeting.

January 6, 2009 - Planning Commission meeting (workshop at 7 pm, formal meeting @ 7:30 pm)

January 19, 2010 - Board of Supervisors meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)

All meetings are held at the Township Administration Building and are open to the public. The application and plans are available for review during normal business hours.

Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[signature]
Mark A. Gordon
Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions
Rick Craig, P.E., Township Engineer, West Goshen Township
Charles Olivo, PE

F:\Data\Shared Data\Property Management\53-3\53-3-1.9A (1305 Paoli Pike)\2009 Nat Bank of Malvern LD\1000 foot notification letter LD 112509.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FYI [stamp]

November 20, 2009

Dear Property Owner:

The purpose of this letter is to inform you that Lieberman Early and Company has submitted a Land Development and Conditional Use application for the owners of 1345 Enterprise Drive. The applicant is seeking approval to increase the parking area that serves the existing building, adding 64 parking spaces. No building expansion is proposed as part of this application.

Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of Zoning Variance applications.

The meeting dates and times when this application is scheduled to be discussed are outlined below, and subject to change.

Conditional Use Application

December 4, 2009 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
January 5, 2010 - Board of Supervisors Hearing (workshop at 7:00 pm, formal meeting @ 8:00 pm) Conditional Use Hearing

Land Development Application

December 4, 2009 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
January 6, 2010 - Planning Commission meeting (workshop at 7:00 pm, formal meeting @ 7:30 pm)
February 3, 2010 - Board of Supervisors Meeting (workshop at 7:00 pm, formal meeting @ 8:00 pm)

All meetings are held at the Township Building and are open to the public. The plans are available for review during normal business hours. Please give me a call at 610-692-7171 or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[signature]
Mark A. Gordon
Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-4\53-4-171 (1345 Enterprise Dr.)\1000 foot letter CU and LD 1120090.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FYI [stamp]

November 12, 2009

Ms. Jo-Anne Fote
1747 Towne Drive
West Chester, PA 19380

Dear Ms. Fote:

Pursuant to your request this letter contains background information and a summary of what is planned for the Ridley Creek Sewer Plant (RCSTP).

The current RCSTP was constructed by the developer of Bowtree and Clocktower in the 1980's and subsequently dedicated to the Township. It has a capacity of 400,000 gallons per day and uses the "extended aeration activated sludge process" for wastewater treatment. Occasionally, certain components of the RCSTP, have produced odors that may be offensive to some people,

Several years ago the Township determined that it needed to upgrade the treatment process and expand the RCSTP. It has received approval from the Pennsylvania Department of Environmental Protection to increase the capacity to 750,000 gallons per day and to upgrade the treatment process to the Sequencing Batch Reactor (SBR) treatment process.

The SBR treatment process will result in the discharge of a cleaner treated wastewater (effluent) to the Ridley Creek. In addition, the Township concluded that emphasis also needed to be placed on odor control as well as on the general appearance of the RCSTP.

Construction commenced in the fall of 2008 and specific elements of the project include the following:

  • Increase the capacity of the influent lift station and enclose the wet well in order to reduce odors.
  • Install the influent screen within a building provided with odor control.
  • Construct four new SBR tanks and a treatment building to house the new treatment equipment and controls.
  • Clean, retrofit, and paint the existing treatment tanks to provide flow equalization and sludge processing.
  • Use a centrifuge for sludge processing which will be located in a building with odor control.
  • Replace the existing fence that encloses the RCSTP and install landscaping.

The RCSTP Project is currently under construction with completion scheduled for June of 2010.

The Township is making a significant investment to protect the health and welfare of Township residents and the protection of our environment. This investment includes the installation of odor controls in order to be to be a good neighbor to the residents living near the RCSTP.

Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.

Sincerely,

[signature]
Louis F. Smith, Jr.
Township Manager

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\Letter to Fote 111209.doc

FYI [stamp]

PLGIT
Pennsylvania Local Government Investment Trust

PLGIT's Procurement Card Program Reaches $18.7 Million in Spending for the 2008/09 Cycle, the fourth year of the program!

PLGIT is pleased to announce the success of its Procurement Card Program for the 2008 - 2009 spending year. As the fourth year in the program has been completed, we are excited about the growth in overall spending and new ways that clients are using the procurement card ("P-card").

This year, 26 additional local governments and school districts enrolled in the program, bringing the total to 114 active members, with several more in the application process. The average monthly spending is over $1,500,000 representing an increase of over 62% since August 2008. As the 2009 spending cycle ended this year, rebate checks totaling over $105,000 were sent out to 38 participants and a total rebate of $189,000 has been distributed since program inception. This year, two local governments received rebate payments of over $6,800 and another received over $66,000.

Participants are eligible for a rebate if the total spending of all procurement cards for their school or municipality is $50,000 or greater for the year (September to August).

In addition to the current Rebate Program, the new Incentive Rebate Payment Program, which started on September 1, 2008 and will continue through December 31, 2009, rewards additional rebate dollars to local governments and school districts up to $5,000 for the 16-month period. As of August, 2009, $14,300 has been earned in additional rebates through this program.

About the P-card

The P-card looks and operates like a credit card but does not carry a revolving line of credit. Using a P-card to make purchases can eliminate the typical requisition, purchasing, receiving and accounts payable processes and other time consuming steps and costs involved in purchases.

When applying for the card, the tax identification number of the municipality or school is requested, not an individual's social security number. There is no cost to join the Procurement Card Program and individual card limits can be set by transaction, vendor or time period, controlling maverick purchases and contractor/vendor usage.

If you have questions, comments, or would like to learn more about the procurement card program, please call your marketing representative at 1-800-572-1472 or visit us at www.plgit.com.

One Keystone Plaza • Suite 300 • North Front & Market Streets • Harrisburg, PA 17101-2044
Mailing Address: P.O. Box 1027 • Harrisburg, PA 17108-1027 • 1-800-572-1472 • Fax: 1-800-252-9551 • www.plgit.com

Distributed exclusively by PFM Fund Distributors, Inc.

This information does not represent an offer to sell or a solicitation of an offer to buy or sell any fund or other security. Investors should consider the investment objectives, risks, charges and expenses before investing in any of the Trust's portfolios. This and other information about the Trust's portfolios is available in each portfolio's current Information Statement, which should be read carefully before investing. Copies of these Information Statements may be obtained by calling 1-800-572-1472 or are available on the Trust's website at www.plgit.com. While the PLGIT and PLGIT/ARM portfolios seek to maintain a stable net asset value of $1.00 per share and the PLGIT/TERM portfolio seeks to achieve a net asset value of $1.00 per share at its stated maturity, it is possible to lose money investing in the Trust. An investment in the Trust is not insured or guaranteed by the Federal Deposit Insurance Corporation or any other government agency. Shares of the Trust's portfolios are distributed by PFM Fund Distributors, Inc., member Financial Industry Regulatory Authority (FINRA) (www.finra.org). PFM Fund Distributors, Inc. is a wholly owned subsidiary of PFM Asset Management LLC. Member SIPC.

The Pennsylvania Powercard Program (the "Program") offers a Procurement Card (a "P-Card"), issued by Harris Bank, N.A., and marketed by PFM Financial Services LLC. PLGIT is a Program sponsor and the Program is marketed to PLGIT Participants. PLGIT receives no compensation for its sponsorship and the Trust is indemnified against any liabilities or costs relating to the Program.

SMPLGIT, PLGIT-Class Shares, PLGIT/PLUS-Class Shares, PLGIT/I-Class Shares, PLGIT/TERM, PLGIT-CD, PLGIT/ARM, PLGIT/SAM, and PLGIT-CAP are service marks of the Pennsylvania Local Government Investment Trust.