Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

MA Minutes 6/18/2009 Page 1 of 2

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY MEETING MINUTES

JUNE 18, 2009

The East Goshen Township Municipal Authority held a special meeting on Thursday June 19, 2009 at 9:00 AM at the East Goshen Township building. Members in attendance were: Fran Beck and Jack Yahraes and Joe McCawley. Mike Steinberger and Joe McCawley participated via speaker phone. Also in attendance were: Township Manager Rick Smith, Director of Public Works, Mark Miller, Scott Towler, Brickhouse Associates, and Matt Mcaloon, Pennoni Associates COMMON ACRONYMS: MA – Municipal Authority HC – Historical Commission PC – Planning Commission CB – Conservancy Board PR – Park & Recreation Board BOS – Board of Supervisors

I&I – Inflow & Infiltration RCSTP – Ridley Creek Sewer Treatment Plant LCSTP – Lockwood Chase Sewer Treatment Plant DEP – Department of Environmental Protection EPA – Environmental Protection Agency PHMC – Pennsylvania Historical Museum Commission NPDES – National Pollutant Discharge Elimination System 1. CALL TO ORDER/PLEDGE OF ALLEGIANCE Fran Beck called the meeting to order at 9:00 AM. 2. RIDLEY CREEK SEWER TREATMENT Rick Smith reported that Worth (General Contractor for the RCSTP Project) had removed Blower #2 at the RCSTP and sent it to Gardner Denver to be rebuilt. The Authority had previously authorized repairs to the blower. He noted that Gardner Denver has advised the Authority that the motor has a vibration and that they would not warrant the blower with the existing motor. Gardner Denver has a replacement motor and the cost would be $1,431. Joe McCawley made a motion to approve the purchase of the replace motor for $1,431. Jack Yahraes seconded the motion. No further discussion or public comment was heard. The motion passed unanimously. Mark Miller noted that he had directed Gardner Denver to ship the defective motor to the Township and that he would have it rebuilt and kept for a spare. Rick Smith reported that he had been in contact with Dutchland (SBR Subcontractor) and recommended that the Authority authorize them to proceed with the repairs to the SBR tanks (seal the SBR tank walls from a specific distance below the lowest crack and above the highest crack) with the condition that Pennoni and Dutchland’s engineers complete there review of the plans for the SBR walls. If both engineers agree that the walls do not meet the ACI standards then the warranty period will be extended to 20 years. If both engineers agree they meet ACI standards then the warranty period will stay at the original 10 year period specified in the specifications. If they disagree the two engineers will select a third engineer, who is acceptable to both, who will review the calculations and make a decision.

MA Minutes 6/18/2009 Page 2 of 2

It was then consensus of the members that they would prefer to wait until Pennoni has finished their review of the plans for the walls before taking any action. Rick was asked to send a letter to Worth and “cc” Dutchland advising them of the Authority’s decision. 3. PUBLIC COMMENT – none 4. ADJOURNMENT Mike moved that the MA adjourn. Jack seconded the motion. No further discussion or public comment was made. The motion carried unanimously. The meeting adjourned at 9:51 AM.

Respectfully submitted by: ___________________________________________ Louis F. Smith, Jr. Township Manager F:\Data\Shared Data\Minutes\Municipal Authority\2009\MA June 1809 Final.doc