Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
December 8, 2014
Monday 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s - - to be distributed at meeting. RCSTP in compliance for November.; East Goshen Township Flows
- APPROVAL OF MINUTES November 10, 2014
- APPROVAL OF INVOICES Pennoni Invoice #615122 $ 852.50; Pennoni Invoice #615123 $ 536.75; Pennoni Invoice #615124 $ 103.25
- LIAISON REPORTS
- FINANCIAL REPORTS November 2014 Report
- OLD BUSINESS House Lateral Inspection – on 12/2 Board requested staff prepare a report on this issue.
- GOALS Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014 May 8 – The MA does not have a current mission statement. A first draft included in the packet. June 9 – Changed “lease” to “leasee”. Mission Statement approved by MA on June 9 - Completed
F:\Data\Shared Data\Agendas\Municipal Authority\2014\12-8-14 - .doc
- Submit an article for each newsletter – Due date for newsletter Need by 1/31/14 – Dana Completed Need by 4/30/14 – Jack Completed Need by 7/1/14 - Kevin Completed Need by 10/31/14 – Ed Completed Need by 2/13/15
- Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014 May 8 - Revisions submitted to EGMA, EGPC, WGSTP, CCHD, and CCPC July 14 – BOS scheduled to adopt resolution at their meeting on August 19. Resolution adopted and Plan revision sent to PA DEP on August 25.
- Develop a recommendation on covers for the SBRs – August 1, 2014 May 8 – Draft memo distributed. June 9 – Final memo in packet - Completed
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack- Completed 2 nd Quarter (June) – Ed- Completed 3 rd Quarter (September) Ed - Completed 4 th Quarter (December) Jack
- Respond to capacity requests in 45 days or less. 211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house, 3 Lucas Lane – 44 EDUs. Callahan, North Chester Road 1 EDU
- Continue to implement I & I Plan April 14 – Status Report received October 8 – Status Report Received
- Operate RCSTP in compliance with NPDES Permit January, February, March, May, June, July, August, September, October, November
- NEW BUSINESS Consider rescheduling January 12 meeting to 6 pm; Select representative to Comp Plan Task Force.; Reservoir Road PS Proposal
F:\Data\Shared Data\Agendas\Municipal Authority\2014\12-8-14 - .doc
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2014\12-8-14 - .doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
December 1, 2014
To: Municipal Authority
From: Mark Miller
Re: November 2014 Monthly Report
It was a very busy month on all the systems.
Meters: We had problems with the meters including the portable meters. Allied Control was called to make repairs. The meter on Wilson Drive had meter flows that were climbing, we found that the transducer was failing. Allied installed a spare transducer that we had in stock. Two of the portable meters failed when the band holding the metering probe broke away and flowed down stream fortunately we were able to retrieve the probe.
C.C. Collection: While reviewing Pa. One calls we saw that Battavio Plumbing was doing a lateral repair, I called Carmen to see what the problem was; he stated that when his employee was on site they found sewage coming from the stand pipe at the street. We went out and ran the camera from the stand pipe to the main we found that the pipe had dropped, we excavated the lateral and verified that the lateral did not have enough fall. After some discussion we decided to abandon the existing lateral and install a new lateral about 20 foot further down the main; this required the removal of a large Ash tree and a hedge row of brush.
The pump stations were visited on a routine basis, the pumps that were pulled last month were repaired and picked up at Deckmen Electric.
R.C. Collection: The Hunt Country Pump Station was visited on a daily basis with no problems to report.
R.C. Plant: On November 20th I received a call from the plant operator who reported that the generators came on to run as they do on a weekly basis; then he heard a boom and the power went out. When I got to the plant and opened the transfer switch door I saw that the switch had blown apart. I called our contractor who responded; due to the age of the transfer switch which is no longer made; it was decided to purchase a new transfer switch out of Texas. Between Paul Siddell and Leni Electric they were able to put a piece of wood in the old transfer switch to allow street power and get the lift station and forward feed pumps operational. Do to the outage we flooded out the screen with 9 feet of sewage. However we never overflowed into the meadow. We were not able to get the transfer switch operational until Monday.
On November 28th the operator called to report that he heard a bang in the MCC#2 and lost power to the lift station pump #2 and the heat in the sludge room. I contacted Lenni who responded however; it was decided that as long as the other two pumps were working we would not touch anything until Monday.
Lateral Repairs: 1631 Still Lane
Alarms: We responded to 28 alarms for the month of November.
PA One Calls: We received 120 PA One calls in November.
EGMA 1401
Pennoni
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: December 5, 2014
SUBJECT: Engineer’s Report
Invoices
- Invoices with summaries are provided under separate cover.
Reservoir Road Pump Station Act 537 Plan
- The Act 537 Plan Update was submitted to PADEP on August 25, 2014. PADEP has reviewed the Plan Update, and they provided two comments, which we have addressed: We submitted revised Plan Update pages to address a project scheduling comment on October 16.; U.S. Fish & Wildlife Service (USFWS) provided approval of the bog turtle habitat survey and proposed construction avoidance measures on November 14. The approval letter was forwarded to PADEP on November 17. The approval letter includes 12 conditions for construction including a requirement that the pipe construction in the vicinity of the Chester Creek only be performed between April 1 and October 31.
- We have requested feedback from PADEP to confirm all comments are satisfactorily addressed, but we have not received a response. Per PADEP guidelines, approval should be issued by December 23, 2014 (within 120 days of the original submission).
Sewer Ordinance Updates
- We finalized proposed revisions to the “Building Sewer” and “Grinder Pump” sections of the Township’s Sewers Ordinance and forwarded to the Township for consideration of enactment via ordinance amendment by the Board of Supervisors.
Page 1 of 1
P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-12-05.docx
| 2014 NOVEMBER 4TH QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Precip | DATE | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | NET | ||||
| Inches | READING | GPD | READING | GPD | READING | GPD | READING | GPD | GPD | FLOWS | |
| 0.75 | 11/01/14 | ||||||||||
| 0.00 | 11/02/14 | ||||||||||
| 0.00 | 11/03/14 | ||||||||||
| 0.00 | 11/04/14 | ||||||||||
| 0.15 | 11/05/14 | ||||||||||
| 0.40 | 11/06/14 | 1,854,121 | 902,538 | 6,733,543 | 70,750 | 4,145,437 | 58356 | 2806044 | 74,587 | 24,000 | 698,845 |
| 0.00 | 11/07/14 | 698,845 | |||||||||
| 0.00 | 11/08/14 | 698,845 | |||||||||
| 0.00 | 11/09/14 | 698,845 | |||||||||
| 0.00 | 11/10/14 | 1,857,866 | 936,250 | 6,763,713 | 75,425 | 4,169,077 | 59100 | 2830889 | 62,113 | 24,000 | 739,613 |
| 0.00 | 11/11/14 | 739,613 | |||||||||
| 0.00 | 11/12/14 | 1,859,672 | 903,000 | 6,777,174 | 67,305 | 4,180,138 | 55305 | 2849412 | 92,615 | 24,000 | 687,775 |
| 0.20 | 11/13/14 | 1,860,629 | 957,000 | 6,784,597 | 74,230 | 4,185,940 | 58020 | 2862638 | 132,260 | 24,000 | 692,490 |
| 0.00 | 11/14/14 | 692,490 | |||||||||
| 0.00 | 11/15/14 | 692,490 | |||||||||
| 0.40 | 11/16/14 | 692,490 | |||||||||
| 0.85 | 11/17/14 | 692,490 | |||||||||
| 0.00 | 11/18/14 | 1,865,690 | 1,012,200 | 6,825,212 | 81,230 | 4,216,105 | 60330 | 2933318 | 141,360 | 24,000 | 729,280 |
| 0.00 | 11/19/14 | 1,866,734 | 1,044,000 | 6,832,973 | 77,610 | 4,221,774 | 56690 | 2947775 | 144,570 | 24,000 | 765,130 |
| 0.65 | 11/20/14 | 765,130 | |||||||||
| 0.00 | 11/21/14 | 1,868,730 | 998,000 | 6,847,429 | 72,280 | 4,233,033 | 56295 | 2975447 | 138,360 | 24,000 | 731,065 |
| 0.00 | 11/22/14 | 731,065 | |||||||||
| 0.00 | 11/23/14 | 731,065 | |||||||||
| 0.00 | 11/24/14 | 1,871,647 | 972,333 | 6,870,448 | 76,730 | 4,250,741 | 59027 | 3008235 | 109,293 | 24,000 | 727,283 |
| 0.00 | 11/25/14 | ||||||||||
| 1.10 | 11/26/14 | ||||||||||
| 0.00 | 11/27/14 | ||||||||||
| 0.00 | 11/28/14 | ||||||||||
| 0.00 | 11/29/14 | ||||||||||
| 0.00 | 11/30/14 | 20,400 | |||||||||
| 4.50 | Day Avg | 965,665 | 74,445 | 57,890 | 111,895 | 23,600 | 716,045 | ||||
| Day Tot | 7,725,322 | 595,560 | 463,123 | 895,158 | 212,400 | 13,604,849 | |||||
| Day Count | 8 | 8 | 8 | 8 | 9 | 19 | |||||
| EG TWP | |
|---|---|
| MONTH TO DATE | 43.31 |
| NORMAL MONTH TO DATE | |
| YEAR TO DATE | 47.81 |
| NORMAL YEAR TO DATE |
2014 NOVEMBER 4TH QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| DATE | HERSHEY'S MILL READING | HERSHEY'S MILL GPD | ASHBRIDGE READING | ASHBRIDGE GPD | HICKS METER READING | HICKS METER GPD | RESERVOIR READING | RESERVOIR GPD | BARKWAY READING | BARKWAY GPD |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/1/2014 | ||||||||||
| 11/2/2014 | ||||||||||
| 11/3/2014 | ||||||||||
| 11/4/2014 | ||||||||||
| 11/5/2014 | ||||||||||
| 11/6/2014 | 23,013,454 | 534,698 | 2,001,471 | 56,315 | 16,252,118 | 243,139 | 59,240,750 | 585,372 | 3,400,442 | 10,094 |
| 11/7/2014 | ||||||||||
| 11/8/2014 | ||||||||||
| 11/9/2014 | ||||||||||
| 11/10/2014 | 23,230,364 | 542,275 | 2,003,789 | 57,950 | 16,345,634 | 233,790 | 59,482,355 | 604,013 | 3,404,797 | 10,888 |
| 11/11/2014 | ||||||||||
| 11/12/2014 | 23,329,650 | 496,430 | 2,004,834 | 52,250 | 16,396,957 | 256,615 | 59,604,037 | 608,410 | 3,406,657 | 9,300 |
| 11/13/2014 | 23,378,600 | 489,500 | 2,005,424 | 59,000 | 16,426,062 | 291,050 | 59,670,055 | 660,180 | 3,407,626 | 9,690 |
| 11/14/2014 | ||||||||||
| 11/15/2014 | ||||||||||
| 11/16/2014 | ||||||||||
| 11/17/2014 | ||||||||||
| 11/18/2014 | 23,654,408 | 551,616 | 2,008,394 | 59,400 | 16,569,463 | 286,802 | 60,014,771 | 689,432 | 3,413,008 | 10,764 |
| 11/19/2014 | 23,709,890 | 554,820 | 2,008,930 | 53,600 | 16,599,820 | 303,570 | 60,088,405 | 736,340 | 3,413,984 | 9,760 |
| 11/20/2014 | ||||||||||
| 11/21/2014 | 23,815,336 | 527,230 | 2,010,030 | 55,000 | 16,659,834 | 300,070 | 60,229,892 | 707,435 | 3,416,125 | 10,705 |
| 11/22/2014 | ||||||||||
| 11/23/2014 | ||||||||||
| 11/24/2014 | 23,991,290 | 586,513 | 2,011,812 | 59,400 | 16,736,795 | 256,537 | 60,424,249 | 647,857 | 3,419,491 | 11,220 |
| 11/25/2014 | ||||||||||
| 11/26/2014 | ||||||||||
| 11/27/2014 | ||||||||||
| 11/28/2014 | ||||||||||
| 11/29/2014 | ||||||||||
| 11/30/2014 | ||||||||||
| 535,385 | 56,614 | 271,447 | 654,880 | 10,303 | ||||||
| 4,283,083 | 452,915 | 2,171,573 | 5,239,038 | 82,420 | ||||||
| 8 | 8 | 8 | 8 | 8 |
2014 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,120,955 | 112,631 | 63,436 | 80,890 | 24,000 | 255,116 | 795,376 | |||
| FEBRUARY | 1,249,173 | 138,449 | 68,472 | 88,803 | 24,000 | 287,831 | 881,433 | |||
| MARCH | 1,182,533 | 126,933 | 67,479 | 84,197 | 24,000 | 860,074 | 75,186 | 291,520 | 827,109 | 28,696 |
| APRIL | 1,242,798 | 143,329 | 76,736 | 88,674 | 24,000 | 1,029,229 | 79,139 | 300,256 | 806,253 | 12,331 |
| MAY | 1,542,161 | 175,112 | 95,766 | 94,501 | 24,000 | 1,337,536 | 117,391 | 357,808 | 937,139 | 20,786 |
| JUNE | 1,117,632 | 118,019 | 66,596 | 96,366 | 24,000 | 718,059 | 68,339 | 287,327 | 744,579 | 11,081 |
| JULY | 965,691 | 100,935 | 55,946 | 86,968 | 24,000 | 613,087 | 57,604 | 261,340 | 676,846 | 9,610 |
| AUGUST | 901,782 | 84,377 | 54,933 | 67,878 | 24,000 | 546,913 | 54,394 | 242,828 | 616,910 | 9,213 |
| SEPTEMBER | 948,410 | 82,233 | 63,005 | 69,743 | 24,000 | 528,956 | 53,424 | 183,533 | 443,679 | 17,998 |
| OCTOBER | 914,111 | 77,792 | 61,149 | 76,199 | 24,000 | 519,162 | 56,103 | 263,386 | 608,616 | 9,877 |
| NOVEMBER | 965,665 | 74,445 | 57,890 | 111,895 | 24,000 | 535,385 | 56,614 | 271,447 | 654,880 | 10,303 |
| DECEMBER | ||||||||||
| Total Flows | ||||||||||
| Monthly Ave | 1,104,628 | 112,205 | 66,492 | 86,010 | 24,000 | 743,156 | 68,688 | 272,945 | 726,620 | 14,433 |
To
West Goshen 839,921
2014 flowmeters -all-stations separate month worksheets.xlsxSUMMARY
November Precip. 4.50 - 2014
[Chart: Bar graph of daily precipitation in November 2014.]
Precip.
0 0.2 0.4 0.6 0.8 1 1.2
snow/rain
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
November
2014 Monthly Precipitation
[Chart: Bar graph of monthly precipitation for 2014 from January through December.]
0 1 2 3 4 5 6 7 8
January February March April May June July August September October November December
Series1
Flowmeters November 2014
[Chart: Line graph of flowmeter readings by day of the month for November 2014.]
Flows
640000 660000 680000 700000 720000 740000 760000 780000
Day of the Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
November
Monthly Totals 2012 Jan-Dec
Bar chart of daily flowmeter readings by month, January through December 2012. Vertical axis (Flowmeters): 0, 500000, 1000000, 1500000, 2000000, 2500000. Horizontal axis (Month): January, February, March, April, May, June, July, August, September, October, November, December. Most bars fall between about 500000 and 1000000, with a few spikes above 1000000 in April, May and September. No bars are shown for December.
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 10, 2014
The East Goshen Township Municipal Authority held their regular public meeting on Monday, November 10, 2014 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Dana Pizarro, Ed McAssey and Fran Beck. Also in attendance were: Rick Smith (Township Manager), Patrick McKenna (Attorney), Scott Towler (Big Fish) and Mike Ellis (Pennoni), and Walter Wujik (Conservancy Board).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response.
Chairman’s Report/Other Members’ Reports
Jack read a thank you note from Bob Adams for recognizing his years of service and for the Blacksmith Shop print.
Sewer Reports
1. Director of Public Works
Mark Miller reported for October 2014:
Meters: All meters were read on a daily basis with the exception of the week of Nov. 1st due to paving. The temporary meters were read on a bi-weekly basis. We purchased a new portable flow meter and installed it on the Interceptor line on Reservoir Road.
CC Collection: All pump stations were visited on a daily basis. The wet wells were washed down. As part of our routine maintenance all number two pumps were pulled for maintenance and sent to Deckman Electric. While pulling the pump at the Barkway pumping station, the rail system, which the pumps are connected to, broke. I was able to rig it back together. We need to replace the entire rail system. Unfortunately, they no longer make this type of rail system. I contacted Jim Seely who quoted us on a new rail system in the amount of $4,118.00 and another $3,900.00 to install the system. I asked MGK for a quote because they have experience on installing these systems. Seely’s price also includes new fulutes for both pumps. If you approve this job, I will order the materials.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 11-10-14 draft.doc
1
Dana moved to approve the purchase of a new rail system and installation up to $9,000.00. Ed seconded the motion. The motion passed unanimously.
Mark’s Report continued:
We also had some sewer lateral problems in Grand Oak Development. A resident thought her neighbor was having a problem. We televised 3 laterals. Two were fine but one was full of roots.
RC Collection: The pumping station was visited on a daily basis. Pump 2 was pulled for maintenance.
RC Plant: No problems to report.
Lateral Repairs: Grand Oak Development – 1430 Grand Oak La, 1432 Grand Oak La, and 1444 Grand Oak La.
Alarms: We responded to 19 alarms for the month of October.
PA One Calls: We received 68 PA One calls in October.
2. Pennoni Engineer’s Report
Mike Ellis gave the following report:
Invoices: Invoices with summaries are provided under separate cover.
Reservoir Rd Pump Station Act 537 Plan: The Act 537 Plan Update was submitted to PADEP on August 25, 2014. PADEP has reviewed the Plan Update and they provided two comments which we are in the process of addressing:
1. We submitted revised Plan Update pages to address a project scheduling comment on October 16.
2. The second comment is that U.S. Fish & Wildlife Service (USFWS) approval is required. We are still awaiting USFWS’s formal approval, and we have contacted them several times to request a written approval.
Tentative Act 537 Planning schedule:
| Estimated Date | |
|---|---|
| Submission to PADEP | August 25, 2014 |
| USFWS approval | estimated by November 14, 2014 |
| PADEP Review and Approval (120 Days) | by December 23, 2014 |
New Sewer Connections: We reviewed revised grinder pump plan submissions for a proposed house and grinder pump at 610 Reservoir Road.
3. Big Fish Environmental Services – The following is Scott’s report for October 2014:
Treatment Process Operation - During September 2014, there were no exceedances of the final effluent discharge limitations for outfall 001 and discharge from Outfall 002. The monthly average total phosphorus concentration was 0.31 mg/L as compared to the permitted limitation of 0.5 mg/L.
During the month, the final effluent total phosphorus concentration discharged ranged from 0.18 mg/L to 0.53 mg/L. A daily average of 99 gallons per day of aluminum sulfate solution was used which was consistent with the 99 gpd for August.
A total of 2,001,900 gallons, which represented a daily average of 133,460 gpd of treated effluent was discharged to Applebrook, Outfall 002. There are no anticipated exceedances of the permitted limitations for the month of October. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 11-10-14 draft.doc
2
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Sequencing batch reactors (SBRs) 1, 3 and 4 were in service during the months of Septemver and October.
Process monitoring of each SBR included ammonia as N, Nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations decreased slightly during September to as low as 40% coverage of the surface area. Increased sludge wasting rates were maintained to manage the MLSS concentrations and F:M ratio within the desired goals. The extended aeration period assists to offset the oxygen demand after extended periods of idle time between treatment cycles.
Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing. Addition of aluminum sulfate solution to the SBRs to assist with Phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was decreased for a daily average of 70.5 gpd during October to assist with total phosphorus removal. The aluminum sulfate dosages prior to filtration remained constant during October. During October, the soda ash addition average increased slightly to approx. 419 lbs/day, as compared to 435 lbs/day during September. Soda ash assists towards maintaining pH concentrations above 7.0 standard units continued during the month.
SBR #2 remains out of service as a treatment unit, however, partially filled with MLSS which continuously mixed and aerated. During October, SBR2 content was transferred to the sludge holding tanks for processing. Cleaning of the SBR is scheduled for Nov. 5th.
Solids Dewatering and Disposal: October 2014
During October, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank #1 was in service. The level at the beginning of the month was 8.73 ft. and the level at the end of the month was 8.00 feet. The average pH concentration was 6.62 S.U. Zero gallons of supernatant were decanted during the month. A total of 600 lbs. of soda ash were added during the month for pH adjustment.
Sludge holding tank #2 was in service. The level at the beginning of the month was 4.77 ft. and the level at the end was 6.92. The average pH concentration was 6.47 S.U. Zero gallons of supernatant were decanted during the month. A total of 900 pounds of soda ash were added during the month for pH adjustment.
Significant storm/hydraulic Loading Events – None for September or October 2014.
Minor Repairs and Preventive Maintenance
ACS replaced a failed level transducer for the influent fine screen.
Several Authority members voice concern about the palates, etc. that are piled up on the ramp when you come into the parking area.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 11-10-14 draft.doc
3
Approval of Minutes
Ed moved to accept the minutes of October 13, 2014 as corrected. Fran seconded the motion. The motion passed unanimously.
Approval of Invoices
1. Fran moved to approve payment of the following Pennoni invoices:
- Pennoni #611142 $ 28.25
- Pennoni #611143 $ 247.50
- Pennoni #611144 $ 141.25
- Pennoni #611145 $ 3,856.00
Dana seconded the motion. The motion passed unanimously.
2. Fran moved to approve payment of the Gawthrop invoices #124666 for $280.00 and #125139 for $540.00. Ed seconded the motion. The motion passed unanimously.
Liaison Reports
Conservancy Board – Walter reported that the Board has a new member, John Scheidt. Scott got 60% off the big trees for the E. Boot Rd. planting and Mark Miller planted them in late September.
Financial Reports
Jon Altshul provided the following report:
The Municipal Authority recorded $2,134 in revenues, including 1 tap-in fee, and $4,252 in expenses in October, a difference of -$2,118. The fund balance is now $1,605,803.
Goals
Jack will go to the December West Goshen meeting.
New Business
1. Grant Agreement – Fran moved to accept the grant from PA Dept of Community & Economic Development in the amount of $37,162.00 and authorize the required officials to sign the agreement. Dana seconded the motion. The motion passed unanimously.
2. Wineberry Lane Easement – Rick explained that the stormwater management system for this street consists of a California Inlet, which needs regular maintenance and to be redone every 8-10 years. Unfortunately, the soils on Wineberry are not suitable for this type of system. Mr. Angelini who owns the property around the inlet is willing to grant an easement over both of his properties to pipe the runoff to the culvert going under Cornwallis Drive. Mark estimates it will cost $18,750.00 to install the perforated pipe. Fran moved to authorize the Chairman to execute the easement agreement. Dana seconded to motion. The motion passed unanimously.
3. Pennoni 2015 Fee Schedule - They are proposing a modest $2.00/hour increase for each classification resulting in a range of increases from 1.8% to 3.1% for an average increase of approximately 2.4%. The estimated total fee for annual services is $37,300 allocated as follows:
| Monthly meetings & general consultation | $12,000 |
|---|---|
| Semi-annual I/I reports | $10,500 |
| Chapter 94 reports | $14,800 |
Dana moved to appoint Pennoni at the proposed 2015 rates. Jack seconded the motion. The motion passed unanimously.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 11-10-14 draft.doc
4
4. Gawthrop Greenwood, PC 2015 Fee Schedule – They propose no change in the current rate of $200.00/hour. Dana moved to appoint Gawthrop Greenwood at the current rate of $200/hr. Fran seconded the motion. The motion passed unanimously.
5. Reservoir Road PS –Permit Durations – Rick provided a copy of the memo from Mike Ellis regarding permit durations. Mike is hoping to have permit approval in December.
6. Accounting Firm 2015 fee proposal – The account firm (Mallie) has proposed a fee of $8,900. Fran moved to accept Maillie’s proposed fee of $8,900. Dana seconded the motion. The motion passed unanimously.
7. Lateral Inspections – Jack raised the subject of having the Township do lateral inspections when a house sells. The time allocated would be 2 hours and cost $100. Dana approved a draft recommendation to the BOS. Fran seconded the motion. The motion passed unanimously.
Capacity Requests
1131 N Chester Road, Callaghan Subdivision – A letter was received from Andrew Eberwein at Edward B. Walsh & Associates on behalf of James Callaghan requested a reservation for 1 EDU for future tie-in of a louse on Lot 2 of this subdivision. Dana moved to reserve 1 EDU for the Callaghan subdivision. Ed seconded the motion. The motion passed unanimously. Rick will send a letter.
Adjournment
There being no further business, Dana moved to adjourn the meeting. Fran seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:50 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 11-10-14 draft.doc
5
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 615122
Invoice Date : 11/17/2014
Project : EGMA1307
Project Name : Reservoir Rd PS Act 537 Planning
For Services Rendered through: 11/9/2014
Prepared and issued revisions to certain Act 537 Plan pages to address PADEP's comments on flowrates, scheduling, and peak factors; continued coordination with U.S. Fish & Wildlife Service to obtain bog turtle habitat submission approval; and prepared list of effective durations for all expected permits and approvals.
Phase : 03 -- Act 537 Plan Update
| Total Phase : 03 -- Act 537 Plan Update | Labor : | 687.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 687.50 |
Phase : 04 -- Additonal Meetings
| Total Phase : 04 -- Additonal Meetings | Labor : | 165.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 165.00 |
| Amount Due This Invoice | $852.50 |
|---|
[Handwritten: ok RS 11/20/14]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning
Invoice # : 615122
...Continued from previous page
Phase : 03 -- Act 537 Plan Update
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 6.25 | 110.00 | 687.50 |
| Labor Total: | 6.25 | 687.50 |
| Total Phase : 03 -- Act 537 Plan Update | Labor : | $687.50 |
|---|---|---|
| Expense : | $0.00 |
Phase : 04 -- Additonal Meetings
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.50 | 110.00 | 165.00 |
| Labor Total: | 1.50 | 165.00 |
| Total Phase : 04 -- Additonal Meetings | Labor : | $165.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning | Labor : | $852.50 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMA1307 Invoice Summary
Invoice Date 11/17/2014
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1307 | ||
| Pennoni Job No.: | Reservoir Rd PS Act 537 Planning | ||
| Invoice No: | 615122 | ||
| Invoice Period: | 10/13/2014 | to | 11/9/2014 |
| Initial Authorization: | $ 77,400.00 | Date: | 11/17/2014 |
| Contract Amount: | $ 87,900.00 | ||
| Previously Invoiced: | $ 72,964.25 | ||
| Current Invoice: | $ 852.50 | ||
| Invoiced to Date ($): | $ 73,816.75 | ||
| Invoiced to Date (%): | 84% | ||
| Remaining Budget ($): | $ 14,083.25 | ||
| Remaining Budget (%): | 16% |
Budget by Phase:
| Phase Summary | Amount |
|---|---|
| Phase Name: | Reservoir Rd PS Act 537 Planning |
| Phase Budget: | $ 87,900.00 |
| Previously Invoiced: | $ 72,964.25 |
| Current Invoice: | $ 852.50 |
| Invoiced to Date ($): | $ 73,816.75 |
| Invoiced to Date (%): | 84% |
| Remaining Budget ($): | $ 14,083.25 |
| Remaining Budget (%): | 16% |
Comments: Prepared and issued revisions to certain Act 537 Plan pages to address PADEP's comments on flowrates, scheduling, and peak factors; continued coordination with U.S. Fish & Wildlife Service to obtain bog turtle habitat submission approval; and prepared list of effective durations for all expected permits and approvals.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 615123
Invoice Date : 11/17/2014
Project : EGMA1401
Project Name : 2014 General Services
For Services Rendered through: 11/9/2014
Prepared for and attended October's MA meeting; prepared Engineer's Report for November's MA meeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 536.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 536.75 |
| Amount Due This Invoice | $536.75 |
|---|
| Billing Summary | Amount |
|---|---|
| Fee : | 10,300.00 |
| Prior Billings : | 8,589.50 |
| Current Billings : | 536.75 |
| Total Billings : | 9,126.25 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.75 | 113.00 | 536.75 |
| Labor Total: | 4.75 | 536.75 |
| Total Phase : **** -- Professional Services | Labor : | $536.75 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1401 -- 2014 General Services | Labor : | $536.75 |
|---|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 11/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 1
East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 11/17/2014
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1401 | ||
| Pennoni Job No.: | 2014 General Services | ||
| Invoice No: | 615123 | ||
| Invoice Period: | 10/13/2014 | to | 11/9/2014 |
| Initial Authorization: | $ 10,300.00 | Date: | 11/17/2014 |
| Contract Amount: | $ 10,300.00 | ||
| Previously Invoiced: | $ 8,589.50 | ||
| Current Invoice: | $ 536.75 | ||
| Invoiced to Date ($): | $ 9,126.25 | ||
| Invoiced to Date (%): | 89% | ||
| Remaining Budget ($): | $ 1,173.75 | ||
| Remaining Budget (%): | 11% |
Budget by Phase:
| Phase Summary | Amount |
|---|---|
| Phase Name: | 2014 General Services |
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 8,589.50 |
| Current Invoice: | $ 536.75 |
| Invoiced to Date ($): | $ 9,126.25 |
| Invoiced to Date (%): | 89% |
| Remaining Budget ($): | $ 1,173.75 |
| Remaining Budget (%): | 11% |
Comments: Prepared for and attended October's MA meeting; prepared Engineer's Report for November's MA meeting.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 615124
Invoice Date : 11/17/2014
Project : EGMA1402
Project Name : 2014 Semi-Annual I&I Reports
For Services Rendered through: 11/9/2014
Cursory analysis of post-calibration meter data from October 1st-10th; and emailed findings and recommendations to Township.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 103.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 103.25 |
| Amount Due This Invoice | $103.25 |
|---|
| Billing Summary | Amount |
|---|---|
| Fee : | 10,300.00 |
| Prior Billings : | 9,759.50 |
| Current Billings : | 103.25 |
| Total Billings : | 9,862.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 113.00 | 28.25 |
| Graduate Engineer | 1.00 | 75.00 | 75.00 |
| Labor Total: | 1.25 | 103.25 |
| Total Phase : **** -- Professional Services | Labor : | $103.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1402 -- 2014 Semi-Annual I&I Reports | Labor : | $103.25 |
|---|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 11/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1402 Invoice Summary
Invoice Date 11/17/2014
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMA1402 | ||
| Pennoni Job No.: | 2014 Semi-Annual I&I Reports | ||
| Invoice No: | 615124 | ||
| Invoice Period: | 10/13/2014 | to | 11/9/2014 |
| Initial Authorization: | $ 10,300.00 | Date: | 11/17/2014 |
| Contract Amount: | $ 10,300.00 | ||
| Previously Invoiced: | $ 9,759.50 | ||
| Current Invoice: | $ 103.25 | ||
| Invoiced to Date ($): | $ 9,862.75 | ||
| Invoiced to Date (%): | 96% | ||
| Remaining Budget ($): | $ 437.25 | ||
| Remaining Budget (%): | 4% |
Budget by Phase:
| Phase Summary | Amount |
|---|---|
| Phase Name: | 2014 Semi-Annual I&I Reports |
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 9,759.50 |
| Current Invoice: | $ 103.25 |
| Invoiced to Date ($): | $ 9,862.75 |
| Invoiced to Date (%): | 96% |
| Remaining Budget ($): | $ 437.25 |
| Remaining Budget (%): | 4% |
Comments: Cursory analysis of post-calibration meter data from October 1st-10th; and emailed findings and recommendations to Township.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA November Financial Reports |
| Date: | December 4, 2014 |
The Municipal Authority recorded $2,130 in revenues, including one tap-in fee, and $4,813 in engineering and legal expenses in November, a difference of -$2,683. The fund balance is now $1,603,120.
A complete list of all year-to-date expenses and revenues is provided.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
November 2014
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 1,605,803.49 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 2,000.00 | 127.61 | 1,444.99 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 2,000.00 | 127.61 | 1,444.99 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO SEWER SINKING FUND | 07492 0550 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | 2,000.00 | 127.61 | 1,444.99 | |
U:\bmccoo\2014\Municipal Authority\2014 - 11 - Municipal Authority Report.xlsx Page 1 of 3 12/04/14
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
November 2014
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 27.00 | 2.09 | 14.99 |
| C.C. TAPPING FEES | 07364 1100 | 124,000.00 | 2,000.00 | 90,600.00 |
| R.C.TAPPING FEES | 07364 1110 | 21,444.00 | 0.00 | 12,288.80 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 1,127.52 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0.00 | 0.00 | 564.48 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 0.00 | 0.00 | 21,000.00 |
| TOTAL REVENUE | 145,471.00 | 2,002.09 | 125,595.79 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,768.00 | 0.00 | 24,129.06 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 4,000.00 | 0.00 | 1,450.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 10,800.00 | 0.00 | 10,800.00 |
| ENGINEERING SERVICES | 07424 3130 | 35,525.00 | 3,997.25 | 32,259.00 |
| LEGAL SERVICES | 07424 3140 | 7,000.00 | 540.00 | 7,060.00 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 22,120.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 5,115.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 117,328.00 | 4,537.25 | 75,698.06 | |
| OPERATING NET RESULT | 28,143.00 | (2,535.16) | 49,897.73 | |
U:\bmccoo\2014\Municipal Authority\2014 - 11 - Municipal Authority Report.xlsx Page 2 of 3 12/04/14
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
November 2014
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 0.00 | 0.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 0.00 | 0.00 | 0.00 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 0.00 | 0.00 | 0.00 |
| MANHOLE COVER REPLACEMENTS | 07424.7405 | 0.00 | 0.00 | 0.00 |
| C.C. CAPITAL - COLLECTION | 07424.7420 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 0.00 | 28.25 | 1,883.50 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 0.00 | 0.00 | 6,323.20 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 75,000.00 | 247.50 | 38,286.25 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 75,000.00 | 275.75 | 46,492.95 | |
| CAPITAL NET RESULT | (75,000.00) | (275.75) | (46,492.95) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 1,603,120.19 | |||
U:\bmccoo\2014\Municipal Authority\2014 - 11 - Municipal Authority Report.xlsx Page 3 of 3 12/04/14
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 INTEREST EARNINGS | 0.00 | |||||||||
| 1401 | JE | 41027 | 0.58 | 02/04/14 | INTEREST | INTEREST EARNED JANUARY 2014 07 FUND |
||||
| 0.00 | 0.58 | -0.58 | ||||||||
| 1402 | 41391 | 1.33 | 03/04/14 | INTEREST | INTEREST EARNED FEBRUARY 2014 07100.1000 |
|||||
| 0.00 | 1.33 | -1.91 | ||||||||
| 1403 | 41840 | 1.71 | 04/01/14 | INTEREST | INTEREST EARNED MARCH 2014 07 FUND |
|||||
| 0.00 | 1.71 | -3.62 | ||||||||
| 1404 | 42321 | 1.21 | 05/02/14 | INTEREST | INTEREST EARNED APRIL 2014 07100.1000 |
|||||
| 0.00 | 1.21 | -4.83 | ||||||||
| 1405 | 42739 | 0.90 | 06/02/14 | INTEREST | INTEREST EARNED MAY 2014 07100.1000 |
|||||
| 0.00 | 0.90 | -5.73 | ||||||||
| 1406 | 43211 | 0.75 | 07/01/14 | INTEREST | INTEREST EARNED JUNE 2014 07100.1000 |
|||||
| 0.00 | 0.75 | -6.48 | ||||||||
| 1407 | 43716 | 1.11 | 08/04/14 | INTEREST | INTEREST EARNED JULY 2014 07 FUND |
|||||
| 0.00 | 1.11 | -7.59 | ||||||||
| 1408 | 44102 | 1.62 | 09/03/14 | INTEREST | INTEREST EARNED AUGUST 2014 07100.1000 |
|||||
| 0.00 | 1.62 | -9.21 | ||||||||
| 1409 | 44521 | 1.53 | 10/01/14 | INTEREST | INTEREST EARNED SEPTEMBER 2014 07100.1000 |
|||||
| 0.00 | 1.53 | -10.74 | ||||||||
| 1410 | 45013 | 2.16 | 11/03/14 | INTEREST | INTEREST EARNED OCTOBER 2014 07100.1000 |
|||||
| 0.00 | 2.16 | -12.90 | ||||||||
| 1411 | 45392 | 2.09 | 12/03/14 | INTEREST | INTEREST EARNED NOVEMBER 2014 07 FUND |
|||||
| 0.00 | 2.09 | -14.99 | ||||||||
| 0.00 | 14.99 | -14.99 | ||||||||
| 07341-1020 INTEREST EARNED - RCSTP EXPANSION | 0.00 | |||||||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1401 | JE | 41028 | 137.33 | 02/04/14 | INTEREST | INTEREST EARNED JANUARY 2014 07 CONSTRUCTION FUND |
||||
| 0.00 | 137.33 | -137.33 | ||||||||
| 1402 | 41392 | 123.56 | 03/04/14 | INTEREST | INTEREST EARNED FEBRUARY 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 123.56 | -260.89 | ||||||||
| 1403 | 41841 | 136.07 | 04/01/14 | INTEREST | INTEREST EARNED MARCH 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 136.07 | -396.96 | ||||||||
| 1404 | 42322 | 131.45 | 05/02/14 | INTEREST | INTEREST EARNED APRIL 2014 CONSTRUCT.FUNDS |
|||||
| 0.00 | 131.45 | -528.41 | ||||||||
| 1405 | 42740 | 134.59 | 06/02/14 | INTEREST | INTEREST EARNED MAY 2014 07 FUND - CONSTRUCTION |
|||||
| 0.00 | 134.59 | -663.00 | ||||||||
| 1406 | 43212 | 129.00 | 07/01/14 | INTEREST | INTEREST EARNED JUNE 2014 07 CONSTRUCTION FUNDS |
|||||
| 0.00 | 129.00 | -792.00 | ||||||||
| 1407 | 43718 | 132.61 | 08/04/14 | INTEREST | INTEREST EARNED JULY 2014 07 CONTRUC.FUND |
|||||
| 0.00 | 132.61 | -924.61 | ||||||||
| 1408 | 44103 | 132.27 | 09/03/14 | INTEREST | INTEREST EARNED AUGUST 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 132.27 | -1,056.88 | ||||||||
| 1409 | 44522 | 128.30 | 10/01/14 | INTEREST | INTEREST EARNED SEPTEMBER 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 128.30 | -1,185.18 | ||||||||
| 1410 | 45014 | 132.20 | 11/03/14 | INTEREST | INTEREST EARNED OCTOBER 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 132.20 | -1,317.38 | ||||||||
| 1411 | 45392 | 127.61 | 12/03/14 | INTEREST | INTEREST EARNED NOVEMBER 2014 07 FUND |
|||||
| 0.00 | 127.61 | -1,444.99 | ||||||||
| 0.00 | 1,444.99 | -1,444.99 | ||||||||
| 07364-1100 C.C. TAPPING FEES | 0.00 | |||||||||
| 1401 | CR | 40976 | 12,600.00 | 01/31/14 | 3034 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 12,600.00 | -12,600.00 | ||||||||
| 1402 | 41258 | 5,400.00 | 02/24/14 | 3553 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | ||||
| RE | 41263 | 2,000.00 | 02/24/14 | 41263 1 | TAP IN FEE - 211 ELLIS LANE | |||||
| 0.00 | 7,400.00 | -20,000.00 | ||||||||
| 1405 | 42661 | 2,000.00 | 05/29/14 | 42661 1 | TAP IN FEE FOR 195 WYLLPEN PL | |||||
| 0.00 | 2,000.00 | -22,000.00 | ||||||||
| 1407 | CR | 43276 | 21,600.00 | 07/03/14 | 21 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
| 43434 | 21,600.00 | 07/21/14 | 26 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||||
| RE | 43312 | 1,800.00 | 07/08/14 | 43312 1 | TAP IN FEE FOR 1637 MANLEY RD | |||||
| 0.00 | 45,000.00 | -67,000.00 | ||||||||
| 1409 | CR | 44456 | 21,600.00 | 09/26/14 | 46 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
| 0.00 | 21,600.00 | -88,600.00 | ||||||||
| 1411 | RE | 45089 | 2,000.00 | 11/06/14 | 45089 1 | TAP IN FEE FOR 610A RESERVOIR | ||||
| 0.00 | 2,000.00 | -90,600.00 | ||||||||
| 0.00 | 90,600.00 | -90,600.00 | ||||||||
| 07364-1110 R.C.TAPPING FEES | 0.00 | |||||||||
| 1402 | 41280 | 2,000.00 | 02/25/14 | 41280 1 | TAP IN FEE-903 SORELL HILL LT2 | |||||
| 0.00 | 2,000.00 | -2,000.00 | ||||||||
| 1403 | 41553 | 2,000.00 | 03/13/14 | 41553 1 | TAP IN FEE FOR 909 SORRELL LT4 | |||||
| 41608 | 2,000.00 | 03/17/14 | 41608 1 | TAP IN FEE-905 SORRELL LOT 3 | ||||||
| 0.00 | 4,000.00 | -6,000.00 | ||||||||
| 1405 | CR | 42355 | 4,288.80 | 05/06/14 | 130 | 6499 | 1 BOWER, JUDITH | |||
| 0.00 | 4,288.80 | -10,288.80 | ||||||||
| 1410 | RE | 44714 | 2,000.00 | 10/15/14 | 44714 1 | TAP IN FEE FOR 1117 TAYLOR AVE | ||||
| 0.00 | 2,000.00 | -12,288.80 | ||||||||
| 0.00 | 12,288.80 | -12,288.80 | ||||||||
| 07364-1130 CONNECTION FEES - SEWER | 0.00 | |||||||||
| 1402 | CR | 41044 | 423.00 | 02/04/14 | 350 | 8035 | 1 JACOBS, ROBERT & CHERYL | |||
| 41124 | 423.00 | 02/14/14 | 774 | 8033 | 1 GEORGE SMITH & CHRISTINA CONLE | |||||
| JE | 41045 | 141.12 | 02/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 41125 | 141.12 | 02/14/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 282.24 | 846.00 | -563.76 | ||||||||
| 1403 | CR | 41402 | 423.00 | 03/04/14 | 2307 | 8034 | 1 STOFFLET, MICHAEL | |||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07364-1130 | 1403 | JE | 41407 | 141.12 | 03/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||
| 141.12 | 423.00 | -845.64 | ||||||||
| 1405 | CR | 42378 | 423.00 | 05/07/14 | 1021 | 8036 | 1 PAPPANO, JOSEPH & PATRICIA | |||
| JE | 42380 | 141.12 | 05/07/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -1,127.52 | ||||||||
| 564.48 | 1,692.00 | -1,127.52 | ||||||||
| 07380-1000 MISCELLANEOUS REVENUE | 0.00 | |||||||||
| 1402 | 41045 | 141.12 | 02/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 41125 | 141.12 | 02/14/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 0.00 | 282.24 | -282.24 | ||||||||
| 1403 | 41407 | 141.12 | 03/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 0.00 | 141.12 | -423.36 | ||||||||
| 1405 | 42380 | 141.12 | 05/07/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 0.00 | 141.12 | -564.48 | ||||||||
| 0.00 | 564.48 | -564.48 | ||||||||
| 07392-0500 TRANSFER FROM SEWER OPERATING | 0.00 | |||||||||
| 1401 | 40674 | 1,000.00 | 01/08/14 | DEPOSIT | DEPOSIT $ INTO MA GENERAL FROM 05 FUND |
|||||
| 40747 | 20,000.00 | 01/14/14 | XFER | XFER $ FROM SEWER TO MA TO COVER EXPENSES |
||||||
| 0.00 | 21,000.00 | -21,000.00 | ||||||||
| 0.00 | 21,000.00 | -21,000.00 | ||||||||
| 07424-1400 ADMINISTRATIVE WAGES | 0.00 | |||||||||
| 1403 | CD | 41815 | 8,043.02 | 03/31/14 | 2237 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2014 MUN.AUTH. REIMBURSM |
|||
| 8,043.02 | 0.00 | 8,043.02 | ||||||||
| 1406 | 43192 | 8,043.02 | 06/30/14 | 2243 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2014 MUN. AUTH.REIMBURSM |
||||
| 8,043.02 | 0.00 | 16,086.04 | ||||||||
| 1409 | 44443 | 8,043.02 | 09/26/14 | 2252 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 3RD QTR.2014 MUN.AUTH. REIMBURSM |
||||
| 8,043.02 | 0.00 | 24,129.06 | ||||||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 5
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 24,129.06 | 0.00 | 24,129.06 | ||||||||
| 07424-3000 MISCELLANEOUS EXPENSE | 0.00 | |||||||||
| 1401 | 40597 | 500.00 | 01/06/14 | 2228 | 2737 | DEP - COMMONWEALTH OF PA NPDES PERMITS - CHAPTER 92A 2014 |
||||
| 950.00 | 01/06/14 | 2229 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2014 ACTIVE MEMBERSHIP DUES |
||||||
| *** | 1,450.00 | 0.00 | *** | |||||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 07424-3110 MUNIC.AUTH.-AUDITING | 0.00 | |||||||||
| 1407 | 43405 | 10,800.00 | 07/16/14 | 2246 | 808 | MAILLIE FALCONIERO & CO. 2013 FINANCIAL STMTS. EXAMINATIO |
||||
| 10,800.00 | 0.00 | 10,800.00 | ||||||||
| 10,800.00 | 0.00 | 10,800.00 | ||||||||
| 07424-3130 ENGINEERING SERVICES | 0.00 | |||||||||
| 1401 | 40653 | -663.75 | 01/06/14 | 2224 | 1052 | PENNONI ASSOCIATES INC. VOID CK. DUE TO PRINTER PROBLEM |
||||
| 40743 | 663.75 | 01/14/14 | 2230 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/8/13 GENERAL S |
|||||
| JE | 40746 | 1,845.00 | 01/14/14 | REFUND | PENNONI REFUND DUE TO DUPLICATE PAYMENT |
|||||
| 0.00 | 1,845.00 | -1,845.00 | ||||||||
| 1402 | CD | 41103 | 2,236.50 | 02/11/14 | 2233 | 1052 | PENNONI ASSOCIATES INC. SERVICES THROUGH 1/12/14 GEN.SER |
|||
| 2,236.50 | 0.00 | 391.50 | ||||||||
| 1403 | 41540 | 6,887.25 | 03/12/14 | 2236 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 2/9/14 2013 CHAP. |
||||
| 6,887.25 | 0.00 | 7,278.75 | ||||||||
| 1404 | 42153 | 8,808.25 | 04/23/14 | 2239 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 CHAP.94 RE |
||||
| 8,808.25 | 0.00 | 16,087.00 | ||||||||
| 1405 | 42462 | 6,198.50 | 05/14/14 | 2241 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 4/13/14 2013 CHAP. |
||||
| 6,198.50 | 0.00 | 22,285.50 | ||||||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 6
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-3130 | 1406 | CD | 42952 | 3,004.75 | 06/12/14 | 2242 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 2014 SEMI-ANN |
||
| 3,004.75 | 0.00 | 25,290.25 | ||||||||
| 1407 | 43405 | 1,521.25 | 07/16/14 | 2247 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 6/15/14 GEN.SERVIC |
||||
| 1,521.25 | 0.00 | 26,811.50 | ||||||||
| 1408 | 43811 | 169.50 | 08/12/14 | 2249 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 2014 SEMI-ANN I&I |
||||
| 169.50 | 0.00 | 26,981.00 | ||||||||
| 1409 | 44268 | 556.00 | 09/16/14 | 2250 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 8/10/14 2014 GEN.S |
||||
| 556.00 | 0.00 | 27,537.00 | ||||||||
| 1410 | 44708 | 724.75 | 10/14/14 | 2253 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 9/14/14 SEMI ANN. |
||||
| 724.75 | 0.00 | 28,261.75 | ||||||||
| 1411 | 45163 | 3,997.25 | 11/14/14 | 2256 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 10/12/14 GEN. SERV |
||||
| 3,997.25 | 0.00 | 32,259.00 | ||||||||
| 34,104.00 | 1,845.00 | 32,259.00 | ||||||||
| 07424-3140 LEGAL SERVICES | 0.00 | |||||||||
| 1402 | 41310 | 800.00 | 02/27/14 | 2234 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES - NOV.2013 GEN.AU |
||||
| 800.00 | 0.00 | 800.00 | ||||||||
| 1403 | 41540 | 700.00 | 03/12/14 | 2235 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - FEB.2014 GEN.AUT |
||||
| 700.00 | 0.00 | 1,500.00 | ||||||||
| 1404 | 42074 | 960.00 | 04/16/14 | 2238 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - MARCH 2014 GEN.A |
||||
| 960.00 | 0.00 | 2,460.00 | ||||||||
| 1405 | 42462 | 1,300.00 | 05/14/14 | 2240 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE APRIL 2014 GEN.AUT |
||||
| 1,300.00 | 0.00 | 3,760.00 | ||||||||
| 1407 | 43291 | 520.00 | 07/07/14 | 2244 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE MAY 2014 - GEN.AUT |
||||
| 43405 | 1,480.00 | 07/16/14 | 2245 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE JUNE 2014 - GEN.AU |
|||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 7
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 2,000.00 | 0.00 | 5,760.00 | ||||||||
| 1408 | 43811 | 80.00 | 08/12/14 | 2248 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 7/3-7/14/14 GEN.AU |
||||
| 80.00 | 0.00 | 5,840.00 | ||||||||
| 1409 | 44372 | 400.00 | 09/22/14 | 2251 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 8/11/14 GEN. AUTH. |
||||
| 400.00 | 0.00 | 6,240.00 | ||||||||
| 1410 | 44899 | 280.00 | 10/23/14 | 2254 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE SEPT.2014 GEN.AUT |
||||
| 280.00 | 0.00 | 6,520.00 | ||||||||
| 1411 | 45163 | 540.00 | 11/14/14 | 2255 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 10/8-10/13/14 GEN.AU |
||||
| 540.00 | 0.00 | 7,060.00 | ||||||||
| 7,060.00 | 0.00 | 7,060.00 | ||||||||
| 07424-7460 LOCHWOOD - CAPITAL -STP | 0.00 | |||||||||
| 1401 | 40739 | 1,290.00 | 01/14/14 | 10012 | 2695 | BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC.201 |
||||
| 40744 | -1,290.00 | 01/14/14 | 10012 | 2695 | BRICKHOUSE ENVIRONMENTAL VOID CK. - INCORRECT CASH ACCT.U |
|||||
| 40745 | 1,290.00 | 01/14/14 | 2231 | 2695 | BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC. 20 |
|||||
| JE | 40820 | 1,290.00 | 01/22/14 | DEPOSIT | DEPOSIT TO REIMBURSE 07 MA FOR 05 EXPENSE |
|||||
| 1,290.00 | 1,290.00 | 0.00 | ||||||||
| 1,290.00 | 1,290.00 | 0.00 | ||||||||
| 07427-1000 RESERVE PUMP STATION - ENGINEER | 0.00 | |||||||||
| 1405 | CD | 42462 | 197.25 | 05/14/14 | 2241 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 4/123/14 RESERVE PS |
|||
| 197.25 | 0.00 | 197.25 | ||||||||
| 1406 | 42888 | 7,316.82 | 06/11/14 | 10019 | 3133 | SMITH INC., RONALD APPLIC.# 3 RESERVE PS DIVERSION |
||||
| 42952 | 619.75 | 06/12/14 | 2242 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 5/11/14 RESERVE PS |
|||||
| 43217 | -7,316.82 | 06/30/14 | 10019 | 3133 | SMITH INC., RONALD VOID CK.10019 PAYMENT AMT.TO BE REDUCED |
|||||
| 619.75 | 0.00 | 817.00 | ||||||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 8
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07427-1000 | 1407 | CD | 43229 | 3,658.41 | 07/02/14 | 10020 | 3133 | SMITH INC., RONALD APPL.#3 RESERVE PS DIVERSION -FI |
||
| 43405 | 309.00 | 07/16/14 | 2247 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 6/15/14 RESERVE PS DIVERSION CONSTRUCTION |
|||||
| 3,967.41 | 0.00 | 4,784.41 | ||||||||
| 1408 | 43811 | 476.75 | 08/12/14 | 2249 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 RESERVE PS DI CONSTRUCTION |
||||
| 476.75 | 0.00 | 5,261.16 | ||||||||
| 1409 | 44268 | 111.25 | 09/16/14 | 2250 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 8/10/14 RESERVE PS |
||||
| 111.25 | 0.00 | 5,372.41 | ||||||||
| 1410 | 44708 | 141.25 | 10/14/14 | 2253 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 9/14/14 RESERVE P |
||||
| JE | 44565 | 3,658.41 | 10/03/14 | RECLASS | RECLASS TRX.43229 - RON SMITH INC. CHECK # 10020 |
|||||
| 141.25 | 3,658.41 | 1,855.25 | ||||||||
| 1411 | CD | 45163 | 28.25 | 11/14/14 | 2256 | 1052 | PENNONI ASSOCIATES INC. SERV. THRU 10/12/14 RESERVE PS D |
|||
| 28.25 | 0.00 | 1,883.50 | ||||||||
| 5,541.91 | 3,658.41 | 1,883.50 | ||||||||
| 07427-2000 RESERVE PUMP STATION - CONSTRUCTION | 0.00 | |||||||||
| 1410 | 44656 | 2,664.79 | 10/09/14 | 10026 | 3133 | SMITH INC., RONALD FINAL PAYMENT- RESERVE PUMP STAT |
||||
| JE | 44565 | 3,658.41 | 10/03/14 | RECLASS | RECLASS TRX.43229 - RON SMITH INC. CHECK # 10020 |
|||||
| 6,323.20 | 0.00 | 6,323.20 | ||||||||
| 6,323.20 | 0.00 | 6,323.20 | ||||||||
| 07428-1000 RESERVOIR PUMP STATION - ENGINEER | 0.00 | |||||||||
| 1402 | CD | 41107 | 10,687.50 | 02/11/14 | 10013 | 1052 | PENNONI ASSOCIATES INC. SERV.THROUGH 1/12/14 RESERVE PS |
|||
| 10,687.50 | 0.00 | 10,687.50 | ||||||||
| 1403 | 41541 | 4,431.25 | 03/12/14 | 10014 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 2/9/14 RESERV.RD. PS |
||||
| 4,431.25 | 0.00 | 15,118.75 | ||||||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 9
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07428-1000 | 1404 | CD | 42154 | 5,909.00 | 04/23/14 | 10015 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 RESERV.RD |
||
| 5,909.00 | 0.00 | 21,027.75 | ||||||||
| 1405 | 42463 | 4,724.50 | 05/14/14 | 10016 | 1052 | PENNONI ASSOCIATES INC. SERV. THRU 4/13/14 RESERVOIR RD. |
||||
| 42514 | 3,150.00 | 05/16/14 | 10017 | 3312 | CONESTOGA & ASSOCIATES PROF.SERVICE THRU 3/30/14 RESERV RD. PS - BOG TURTLE HABITAT |
|||||
| 7,874.50 | 0.00 | 28,902.25 | ||||||||
| 1406 | 42888 | 5,761.25 | 06/11/14 | 10018 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 RESERVOIR RD. |
||||
| 5,761.25 | 0.00 | 34,663.50 | ||||||||
| 1407 | 43406 | 430.00 | 07/16/14 | 10021 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 6/15/14 RESERVOIR RD. |
||||
| 43421 | 100.00 | 07/18/14 | 10022 | 3353 | COMMONWEALTH FINANCING AUTHORITY GRANT APPLICATION FOR DCED SEWAG FACILITIES GRANT FOR ACT 537 PLANNING FOR RESERVOIR RD P/S |
|||||
| 530.00 | 0.00 | 35,193.50 | ||||||||
| 1408 | 43810 | 1,208.75 | 08/12/14 | 10023 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 RESERVOIR RD P ACT 537 PLANNING |
||||
| 1,208.75 | 0.00 | 36,402.25 | ||||||||
| 1409 | 44269 | 414.00 | 09/16/14 | 10024 | 3312 | CONESTOGA-ROVERS & ASSOCIATES PROF.SERV.THRU 7/27/14 BOG TURTL HABITAT ASSESSMENT |
||||
| 781.25 | 09/16/14 | 10025 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 8/10/14 RESERVOIR RD P |
||||||
| *** | 1,195.25 | 0.00 | *** | |||||||
| 1,195.25 | 0.00 | 37,597.50 | ||||||||
| 1410 | 44709 | 441.25 | 10/14/14 | 10027 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 9/14/14 RESERVOIR RD. |
||||
| 441.25 | 0.00 | 38,038.75 | ||||||||
| 1411 | 45187 | 247.50 | 11/17/14 | 10028 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 10/12/14 RESERVOIR RD |
||||
| 247.50 | 0.00 | 38,286.25 | ||||||||
| 38,286.25 | 0.00 | 38,286.25 | ||||||||
| Beg Bal | 0.00 | 129,548.90 | 134,398.67 | -4,849.77 | ||||||
East Goshen Township General Ledger
Report Date 12/04/14 GL Transaction Details PAGE 10
MGRP18 run by BRIAN 9 : 12 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|