Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
May 11, 2015

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s; East Goshen Township Flows
  4. APPROVAL OF MINUTES April 13, 2015
  5. APPROVAL OF INVOICES Pennoni Invoice #634359 ,869.00; Pennoni Invoice #634360 ,622.50; Pennoni Invoice #634361 ,645.00; Pennoni Invoice #634362 ,637.00; Pennini Invoice #634363 ,188.75
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS April 2015 Report
  8. OLD BUSINESS RCSTP electrical single-line as-built diagram with notes from Pennoni also Lenni Elect. TVSS install
  9. GOALS Submit an article for each newsletter – Due date for newsletter Need by 1/30/15 – Jack - Completed Need by 5/1/15 – Dana - Completed Need by 8/31/15 Need by 10/30/15

F:\Data\Shared Data\Agendas\Municipal Authority5-11-15.doc

  1. Obtain construction permits for the Reservoir Road Pump Station – December 31, 2015 2/6 – Test boring done, meeting with Mike to review preliminary site plan and discuss control options. 3/9 concept design completed, met with PA DEP. 5/11 stormwater perc test completed, scheduled to meet with CCCD on 5/21
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter – Jack - Completed 2 nd Quarter – Jack - Completed 3 rd Quarter 4 th Quarter
  3. Respond to capacity requests in 45 days or less.
  4. Continue to implement I & I Plan 5/11 meeting with Mike on 5/13 to review plan
  5. Operate RCSTP in compliance with NPDES Permit February, March
  1. NEW BUSINESS Acknowledge receipt of letter concerning presentation of the Comp Plan to the ABCs on Wednesday June 10, 2015 at 7 pm
  2. CAPACITY REQUESTS
  3. ANY OTHER MATTER
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority5-11-15.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 6, 2015

To: Municipal Authority
From: Mark Miller
Re: April 2015 Monthly Report

Meters:

All meters were read on a daily basis there were no problems to speak of for the month. Allied Control has started the work with regards to the remote meters. Modems have been ordered, once they arrive Allied will start the installation.

C.C. Collection:

All pumping stations were visited on a daily basis with no problems to report. We made 10 sewer cap repairs this month. Ironically while talking with a resident about the sewer system I explained how frost pushes up the clean-outs. I stepped on their clean-out to demonstrate and pushed it down 6 inches.

We had to replace a broken manhole casting and lid on Green Hill Road. As part of our road paving program we will be cleaning and televising Supplee Valley and Cooper Circle. We will also be replacing all manhole casting and lids. I will have a report of our findings at the June meeting. Horn Plumbing contacted me about a new connection on Strasburg Road.

R.C. Collection:

The Hunt Country Pump Station had no problems to report. Once we get the Chester Creek meters up and running we will begin installation of the three meters on the collection system. We replaced several sewer caps on the collection system. Horizon Plumbing did a trap and clean-out repair in Bowtree due to the riser pulling out. I made the inspection and advised them to call us if they do any other repairs.

R.C. Plant:

We performed routine basis this month. The roof on the original building was replaced. We also had to replace several sheets of plywood as well. If you recall the building was Stucco. We have had problems with water getting behind the stucco which caused it to fall off. We have made several attempts to repair the stucco but we were unsuccessful. We hired Springer Brothers to install siding on the building. Scott asked that we order oil for the pumps and other equipment.
On May 4 we started sending water to Applebrook Golf Course.

Re-sale Inspections:

We had six re-sale lateral inspections in the Twp. So far the ones I have done were very simple inspections.

Alarms:

We responded to 15 alarms for April.

PA One Calls:

We received 50 PA One calls since April.

Confined Space Training:

On April 24, the Public Works Department employees attended a confined space training course at the Lancaster Fire Safety Training Center, the course was taught by paid fire offices from the Baltimore Fire Department, Anne Arundel Fire Dept. and the Washington D.C. Fire Dept. the following Twps. And companies participated: East Goshen Twp., West Whiteland Twp., Willistown Twp., Uwchlan Twp. And Lenni Electric sent three electricians as well. WE did two hours of classroom training and we then went to the confined space area where we put our equipment to use. The instructors put us thru several scenarios which included a manhole rescue of a downed employee, the course was well received.

We then went back to the classroom where we had to take a thirty question test. The instructors praised our group for the way we performed our different scenarios. They were impressed that everyone participated without having to be told. They also liked the way the men knew their equipment. They recommended that we purchase two more escape air packs and masks, this is because when you have two men in a confined space OSHA requires that you have two men ready to go in the event someone does down. All the students had an awesome time however the next day we were all very sore but it was well worth it.

EGMA 1501

[Pennoni logo]

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: May 8, 2015
SUBJECT: Engineer’s Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • We provided correspondence and a single-line diagram mark-up to the Township documenting the existing surge protection (TVSS) components in the plant.

Reservoir Road Pump Station

  • We continued with the progress design including site layout, diversion details and diversion piping profiles, pump design, wet well and valve vault, building architectural and HVAC, power, controls, and force main alignment and profiles. We performed a field recon of the proposed force main alignment as well to identify conflicts, namely other underground utilities.
  • The current progress design plans will be reviewed with the Township Manager and PW Director on May 13 th . We expect to have the progress (approx 60%) plans completed by the June MA meeting.
  • We performed infiltration testing at the proposed pump station site on April 15 th . Four test pits were excavated, and limiting conditions were found at shallow depths in two of them – rock in one, groundwater in the other. The infiltration rate in the other pits was 0.25 inches/hour, which is extremely limited. We are evaluating the stormwater management concepts in light of the severely limited infiltration capability.
  • A NPDES Stormwater pre-application meeting has been schedule with PADEP and the Chester County Conservation District on May 21 st . The

Hershey’s Mill PS and Marydell PS Diversions

  • The 2-year Maintenance Bonds on the Hershey’s Mill PS and Marydell PS Diversions expire on July and August respectively. We recommend warranty inspections be performed this month (May).

Page 1 of 2
P:\Projects\EGMA\Memos to Board5\Memo to EGMA Board 2015-05-08.docx

EGMA 1501

New Connections

  • We performed a field inspection during the Acero Pump Station force main pressure test and conducted a preliminary inspection of the private pump station and valve vault.
  • We received a submission for a proposed grinder pump at 1414 Bramble Lane that will be reviewed the week of May 11 th .

Page 2 of 2
P:\Projects\EGMA\Memos to Board5\Memo to EGMA Board 2015-05-08.docx

[Big Fish Environmental Services Inc. logo]

Monthly Operations Report: April 2015

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 exceeded the monthly average discharge limitation for ammonia as nitrogen during the month of March. The elevated ammonia nitrogen discharge concentration was the results of excessive wasting of activated sludge, precipitation and seasonal changes. There was no discharge to Applebrook, which is identified as outfall 002. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The cloth media for disc filter number 2 cloth media was replaced. There were no operational issues were observed during operation sludge dewatering equipment. SBR number 3 decanter was periodically tilted and required adjustment.

Treatment Process Operation

During March 2015, there was one exceedance of the final effluent discharge limitation of the monthly average for ammonia as nitrogen for outfall 001. To control the excessive foam accumulation of the surface of the SBRs resulting from the presence of the filamentous bacteria Microthrix parvicella, sludge wasting was increased to raise the F:M ratio and reduce the total suspended solids (TSS) concentrations entering the post flow equalization (EQ) basins and final effluent. In early March, it a tear in the cloth media for disc filter number 2 was discovered. This tear was the root source for the elevated TSS concentrations in the final effluent discharge rather than carryover solids from the SBRs into the post EQ basins. Replacement of the disc filter cloth media and adjustments to the activated sludge process resulted in reinstating the nitrification process and lowering the TSS concentrations in the final effluent discharge.

The early spring season is typically when the biological process is transitioned from the winter season mode (cold weather) of operation to the spring/summer mode of operation with increased ambient air and water temperatures. This transition also contributed to the decreased nitrification effectiveness through lower ambient air temperatures and precipitation ranging from rainfall to snow.

The total phosphorus monthly average concentration of 0.26 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the March 2015 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.15 mg/L to 0.40 mg/L. The aluminum sulfate daily average increased during March to 98.4 gpd.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 7

[Big Fish Environmental Services Inc. logo]

Table 1

March 2015 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
March 3, 2015 0.371 3.5 10.8 15 46 2.00 6.19 0.40 1.24 89 1.9494
March 9, 2015 0.460 9 35
March 10, 2015 0.528 4.4 19.4 4 18 4.44 19.6 0.20 0.88 1 0.0000
March 12, 2015 0.410 7 24
March 17, 2015 0.411 4.7 16.1 6 21 10.30 35.3 0.30 1.03 14 1.1461
March 18, 2015 0.426 6 21
March 19, 2015 0.360 15 45
March 24, 2015 0.454 5.40 20.4 15 57 11.10 42.0 0.26 0.98 2 0.3010
March 25, 2015 0.354 15 44
March 27, 2015 0.506 7 30
March 31, 2015 0.381 2.40 7.63 10 32 10.50 33.4 0.15 0.48 2 0.3010
Average 0.424 4.1 14.9 10 34 7.7 27.3 0.26 0.92 7 0.8491
Minimum 0.354 2.4 7.6 4 18 2.0 6.19 0.15 0.48 1 0.0000
Maximum 0.528 5.4 20.4 15 57 11.1 42.0 0.40 1.24 89 1.9494

There was no discharge from Outfall 002 to Applebrook during March 2015.
Table 2 illustrates the influent wastewater pollutant loadings for March 20115. The influent loadings remained within the treatment facility design loadings.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 7

[Big Fish Environmental Services Inc. logo]

Table 2

March 2015 - Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
March 3, 2015 0.485 171 692 104 421 31.0 125 39.1 3.8 4.2 17
March 10, 2015 0.836 199 805 64 259 33.7 136 31.9 2.0 3.8 15
March 17, 2015 0.551 42.8 173 69 279 16.8 68 17.8 4.6 2.0 8
March 24, 2015 0.444 186 752 210 849 27.5 111 40.4 4.2 4.6 19
March 31, 2015 0.460 189 764 199 805 28.8 116 43.8 4.2 4.2 17
Average 0.555 158 637 129 452 27.6 111 34.6 4 3.8 15
Minimum 0.444 43 173 64 259 16.8 68 17.8 2 2.0 8
Maximum 0.836 199 805 210 849 33.7 136 43.8 5 4.6 19

Table 3 presents the available Outfall 001 final effluent data for the month of April 2015. During April, excessive foam conditions remained on the surface of the SBRs resulting from the filamentous bacteria Microthrix parvicella

Process control measures to minimize the adverse effects of the Microthrix parvicella bacterium included increased lowering the MLSS concentrations. One impact of lowering the MLSS concentrations during this time of year as temperatures and hydraulic conditions vary, result in inhibiting the effectiveness of nitrification. During March, the final effluent ammonia as nitrogen concentrations became elevated.

At the present time, there are no anticipated exceedances of the permitted limitations for April 2015. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 7

[Big Fish Environmental Services Inc. logo]

Table 3

April 2015 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
April 7, 2015 0.346 6.7 19.3 16 46 2.87 8.28 0.28 0.81 10 1.0000
April 14, 2015 0.356 5.9 17.5 10 30 0.696 2.07 0.36 1.07 1 0.0000
April 16, 2015 0.309 7 18
April 21, 2015 0.396 4.2 13.9 13 43 0.54 1.8 0.45 1.49 1 0.0000
April 23, 2015 0.361 6 18
April 24, 2015 0.339 6 17
April 28, 2015 0.297 0.35 0.87 1.00 0.0000
Average 0.343 5.6 16.9 10 29 1.4 4.0 0.36 1.06 2 0.2500
Minimum 0.297 4.2 13.9 6 17 0.5 1.79 0.28 0.81 1 0.0000
Maximum 0.396 6.7 19.3 16 46 2.9 8.3 0.45 1.49 10 1.0000

During April 2015, there was no discharge of treated effluent to Applebrook. The pump has been placed in the off mode during the winter months. The pump for Applebrook was activated on May 4, 2015.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during April 2015.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 7

[Big Fish Environmental Services Inc. logo]

Table 4

April 2015 - Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
April 7, 2015 0.451 83.1 312 223 838 39.5 149 45.1 169.6 6.2 23
April 14, 2015 0.455 171 643 134 504 33.9 127 46.1 175.1 5.5 21
April 21, 2015 0.477 93.2 350 110 414 33.8 127 40.5 161.2 5.2 20
April 28, 2015 0.413
Average 0.449 116 435 156 585 35.7 134 43.9 169 5.6 21
Minimum 0.413 83 312 110 414 33.8 127 40.5 161 5.2 20
Maximum 0.477 171 643 223 838 39.5 149 46.1 175 6.2 23

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during March and April

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. The average coverage of the surface area was estimated at 90%. Increased sludge wasting rates were maintained to manage the MLSS concentrations and F:M ratio within the desired goals. Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs increased to a daily average of 98.4 as compared to the previous month average of 87.0 gpd. During April, soda ash daily addition increased to 465 lbs. per day as compared to the previous month's average of 389 lbs. per day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 7

[Big Fish Environmental Services Inc. logo]

to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

SBR No. 2 remains out of service as a treatment unit. Minor repairs will be scheduled as weather conditions permit.

Solids Dewatering and Disposal: April 2015

Sludge Dewatering Summary
Gallons of sludge dewatered 262,122
Average Dewatered Total Solids, % NA
Wet Tons NA
Dry Tons NA
Number of dumpsters 4

*Seventeen (17) days of centrifuge operation

Flow data:

Flow Meter Location April 2015 Daily Maximum Flow, gpd
Total Volume for Month, MG Average Daily Flow, gpd
Influent Wastewater to Screening Building* 13.163 438,754 579,630
Influent Wastewater to SBRs 12.998 433,263 502,656
Internal Recycle 0.272 9,051 59,170
Treated Effluent to Disc Filters 12.904 430,142 537,856
Final Effluent Discharge 10.169 338,967 422,000
Applebrook Golf Course 0 0 0

Chemical Usage:

Chemical April 2015 Daily Average Total Monthly
Soda Ash 465 14,400
Aluminum Sulfate solution 98.4 2,854
Polymer (centrifuge) 0.84 14.3

*Seventeen (17) days of centrifuge operation

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 7

[Big Fish Environmental Services Inc. logo]

During April, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids. Sludge holding tank No. 1 was in service. The level at the beginning of April was 9.69 feet and the level at the end of the month was 8.76 feet. The initial total solids concentration was 0.71% increasing to 0.90% at the end of the month. The average pH concentration was 7.01 S.U. The average total alkalinity concentration was 240 mg/L. Zero gallons of supernatant were decanted during the month. A total of 450 pounds of soda ash were added.

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 8.12 feet and the level at the end was 10.87. The initial total solids concentration was 0.91% total solids decreasing to 0.75% at the end of the month. The average pH concentration was 6.64 S.U. and 900 pounds of soda ash was added. The average total alkalinity concentration was 168 mg/L. Zero gallons of supernatant were decanted.

Significant Storm/Hydraulic Loading Events

During April, there was one storm event resulting in daily precipitation amounts greater than 0.5 inches measured during a 24 hour period. On April 20th, 0.98 inches of rainfall was recorded. A total of 2.4 inches of rainfall was measured at the facility during March.

Minor Repairs and Preventative Maintenance

The cloth media for disc filter number 2 was replaced.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 7

2015 flowmeters -all-stations separate month worksheets.xlsxAPR

2015 APRIL 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT GPD NET FLOWS
0.0004/01/152,008,9071,057,0008,149,54395,5905,055,80760,0004,011,69265,34020,000836,070
0.3004/02/15836,070
0.7004/03/15836,070
0.0004/04/15836,070
0.0004/05/15836,070
0.0004/06/15836,070
0.5004/07/152,015,0841,029,5008,207,32196,2975,091,65959,7534,052,98868,82720,000804,623
0.5004/08/152,016,0961,012,0008,216,57692,5505,098,73970,8004,058,71457,26020,000791,390
0.7004/09/152,017,080984,0008,225,05584,7905,105,06063,2104,063,63149,17020,000786,830
0.0004/10/152,018,061981,0008,233,54884,9305,111,27662,1604,068,92552,94020,000780,970
0.0004/11/15780,970
0.0004/12/15780,970
0.0004/13/152,021,045994,6678,261,40292,8475,130,23063,1804,080,45138,42020,000800,220
0.1504/14/152,022,031986,0008,270,13187,2905,136,61463,8404,085,38149,30020,000785,570
0.0004/15/152,023,0311,000,0008,278,97788,4605,143,17965,6504,091,96165,80020,000780,090
0.0004/16/152,024,027996,0008,287,62786,5005,149,72265,4304,098,72267,61020,000776,460
0.1004/17/152,025,0301,003,0008,296,81191,8405,156,30965,8704,105,11063,88020,000781,410
0.0004/18/15781,410
0.1004/19/15781,410
1.1004/20/152,028,011993,6678,325,45495,4775,175,71464,6834,119,79048,93320,000784,573
0.1004/21/152,029,3001,289,0008,341,303158,4905,183,14274,2804,126,21564,25020,000991,980
0.1504/22/152,030,5301,230,0008,354,086127,8305,190,58874,4604,132,69564,80020,000962,910
0.0004/23/15962,910
0.0004/24/15962,910
0.0004/25/15962,910
0.0004/26/15962,910
0.0004/27/152,035,5521,004,4008,401,79995,4265,221,84162,5064,159,12752,86420,000793,604
0.0004/28/152,036,6021,050,0008,410,96891,6905,227,94161,0004,164,56054,33020,000842,980
0.0004/29/152,037,533931,0008,418,81778,4905,233,68757,4604,170,15955,99020,000739,060
0.0004/30/152,038,5891,056,0008,427,81589,9805,240,19765,1004,177,12069,61020,000831,310
Day Avg1,035,13196,38164,67058,19620,000
4.40Day Tot17,597,2331,638,4761,099,383989,324340,00025,026,801
Day Count171717171730
E.GOSHEN
MONTH TO DATE4.40
NORMAL MONTH TO DATE
YEAR TO DATE15.13
NORMAL YEAR TO DATE

5/1/2015 9:46 AM

2015 flowmeters -all-stations separate month worksheets.xlsxAPR

2015 APRIL 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

DATE HERSHEY'S MILL READING HERSHEY'S MILL GPD ASHBRIDGE READING ASHBRIDGE GPD HICKS METER READING HICKS METER GPD RESERVOIR READING RESERVOIR GPD BARKWAY READING BARKWAY GPD
04/01/1533,493,201876,0902,097,39170,20020,133,414273,58069,737,386723,4503,574,2969,350
04/02/15
04/03/15
04/04/15
04/05/15
04/06/15
04/07/1534,002,332848,5522,101,61170,33320,282,696248,80370,148,126684,5673,580,75510,765
04/08/1534,080,840785,0802,102,27866,70020,308,754260,58070,215,639675,1303,581,7109,550
04/09/1534,157,100762,6002,102,97369,50020,332,692239,38070,280,503648,6403,582,6098,990
04/10/1534,231,248741,4802,103,61764,40020,358,008253,16070,346,395658,9203,583,5499,400
04/11/15
04/12/15
04/13/1534,460,852765,3472,105,72770,33320,424,524221,72070,538,363639,8933,586,74510,653
04/14/1534,529,888690,3602,106,36964,20020,449,784252,60070,605,101667,3803,587,6038,580
04/15/1534,598,812689,2402,107,03967,00020,475,956261,72070,673,593684,9203,588,4808,770
04/16/1534,667,800689,8802,107,68664,70020,502,568266,12070,741,777681,8403,589,3879,070
04/17/1534,738,276704,7602,108,35266,60020,528,582260,14070,809,999682,2203,590,2999,120
04/18/15
04/19/15
04/20/1534,954,580721,0132,110,41868,86720,594,314219,10771,001,086636,9573,593,2889,963
04/21/1535,030,864762,8402,111,23882,00020,623,650293,36071,087,548864,6203,594,41211,240
04/22/1535,112,308814,4402,112,04981,10020,651,798281,48071,168,921813,7303,595,48910,770
04/23/15
04/24/15
04/25/15
04/26/15
04/27/1535,464,644704,6722,115,49468,90020,769,370235,14471,500,596663,3503,600,3389,698
04/28/1535,535,436707,9202,116,16366,90020,795,680263,10071,567,036664,4003,601,2749,360
04/29/1535,593,912584,7602,116,78261,90020,819,210235,30071,627,491604,5503,602,0407,660
04/30/1535,662,896689,8402,117,49371,10020,846,886276,76071,696,970694,7903,603,09310,530
737,58169,102255,415687,6099,616
12,538,8741,174,7334,342,05411,689,357163,470
1717171717

5/1/2015 9:46 AM

2015 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR BARKWAY
JANUARY 1,037,476 93,837 60,552 66,143 24,000 674,598 60,156 251,166 706,594 11,242
FEBRUARY 1,023,411 90,015 59,017 64,695 24,000 696,731 64,656 265,565 683,531 11,872
MARCH 1,212,666 123,312 70,912 70,480 24,000 947,399 81,101 300,634 836,728 12,978
APRIL 1,035,131 96,381 64,670 58,196 24,000 737,581 69,102 255,415 687,609 9,616
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave 359,057 33,629 21,263 21,626 8,000 254,692 22,918 89,398 242,872 3,809

To
West Goshen 282,540

2015 flowmeters -all-stations separate month worksheets.xlsxSUMMARY

April Precip. 4.40 - 2015

Bar chart showing daily precipitation (snow/rain) for April 2015.

  • Legend: April
  • Y-axis (Precip.): 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
  • X-axis (snow/rain): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32

2015 Monthly Precipitation

Bar chart showing 2015 Monthly Precipitation (Series1) from January through December on a scale from 0 to 5 (0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5, 4, 4.5, 5).

Month Series1 (Approximate Precipitation)
January~4.2
February~1.65
March~4.8
April~4.45
May0
June0
July0
August0
September0
October0
November0
December0

Flowmeters April 2015

Line chart showing daily flowmeter readings (Flow's) for April 2015 across days 1 through 30 of the month.

  • Vertical Axis (Flow's): 0, 200000, 400000, 600000, 800000, 1000000, 1200000
  • Horizontal Axis (Day of the Month): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
  • Legend: April

Monthly Totals 2015 Jan-Dec

Bar chart showing daily flowmeter readings grouped by month for 2015 (Jan-Dec), with data bars populated for January, February, March, and April.

  • Vertical Axis (Flowmeters): 0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000, 1600000
  • Horizontal Axis (Month): January, February, March, April, May, June, July, August, September, October, November, December

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 13, 2015

The East Goshen Township Municipal Authority held their regular public meeting on Monday, April 13, 2015 at 6:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Dana Pizarro, Jack Yahraes, Fran Beck, and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Township Supervisor), Mike Ellis (Pennoni), and Jessica Wiesak (Attorney).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services
BOS – Board of Supervisors
CB – Conservancy Board
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
HC – Historical Commission
I&I – Inflow & Infiltration
LCSTP – Lockwood Chase Sewer Treatment Plant
MA- Municipal Authority
NPDES – National Pollutant Discharge Elimination System
PC – Planning Commission
PM – Prevention Maintenance
PR – Park & Recreation Board
RCSTP – Ridley Creek Sewer Treatment Plant
SBR – Sequencing Batch Reactor
SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Kevin called the meeting to order at 6:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Kevin asked if anyone would be recording the meeting and there was no response.

Chairman’s Report/Other Members’ Reports

1. Jack reported that he attended the West Goshen meeting.

Sewer Reports

1. Director of Public Works

Mark Miller reported for March 2015:
Meters: All meters were read on a daily basis.
C.C. Collection: We responded to 4 lateral clogs, two were in Grand Oak, one in Hershey Mills, and one in White Chimney. All clogs were cleared.
R.C.Collection: Pump Stations were visited on a daily basis with no problems to report.
R.C. Plant: No problems to report.
Re-sale Inspections: We had 4 re-sale lateral inspections in the township. I inspected them and found no problems.
Alarms: We responded to 14 alarms for the month of March.
PA One Calls: We received 46 PA One calls in March.

2. Pennoni Engineer’s Report

Mike reviewed the revised plan for the proposed Reservoir Rd pump station. They met with DEP to review the plan. The wet well is outside the building so it only contains a generator and the building is smaller. Jack asked if the drive can be gravel. Rick commented that there is no difference in storm water management. Two borings have been done.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 4-13-15 draft.doc

1

Mike Ellis provided the following report:
Invoices: Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP):

  1. We provided consultation and correspondence to the Township on the proposed surge protection addition and replacement and the premature UV ballast failures. We agree with the proposed approach to add a new TVSS immediately prior to the ballasts and that the ballast failures are likely due to surges. The Township should consider contacting the new ballast vendor and manufacturer to determine their troubleshooting and customer support capabilities now in the event there continues to be issues following the new TVSS installation.
  2. We attended a tour of the plant and a field visit to the Ashbridge Pump Station with Mark Miller and Pat McKenna on April 2 nd .

Reservoir Rd Pump Station:

  1. We attended the PADEP Water Quality Management (WQM) Permit pre-application with Rick Smith at PADEP’s Norristown office on March 13 th . PADEP had some minor comments, but they were agreeable to the design and permitting approach for the project. The project will require an individual WQM permit instead of a general permit due to the proposed daily pump volume.
  2. We initiated the progress design including site layout, diversion details and diversion piping profiles, pump design, wet well and valve vault, building architectural and HVAC, power, and controls. A current draft of plans will be presented at the April 13 th Municipal Authority meeting.
  3. The existing conditions field survey work continued and has been substantially completed. An existing conditions plan is nearly complete. Once it is complete, force main plans and profiles will be prepared.
  4. We are coordinating with the PW Department to perform two infiltration tests at the proposed pump station site within the next 2 weeks. The tests are needed for future stormwater management design. Once the tests are performed, we will schedule a NPDES Stormwater pre-application meeting with PADEP and the Chester County Conservation District.

Chapter 94 reports:

  1. We completed the 2014 Chapter 94 Reports for the RCSTP, West Goshen Service Area (WGSA), and Westtown Service Area, and we submitted them to PADEP on March 31 st . The ECSTP, pump stations, and sewers all have adequate capacity. A summary of the PCSTP and WGSA reports follows:

RCSTP:
The 2014 annual average influent flow (not including recycle flows) was 0.409 MGD, and the 3-month maximum average flow was 0.479 MGD. The plant’s permitted average capacity is 0,750 MGD. The 5-year projected annual average and maximum month flows are 0.396 MGD and 0.458 MGD respectively.
The 2014 annual average organic loading (not including recycle flows) was 701 lbs/day BOD5, and the maximum month loading was 930 lbs/day BOD5. The permitted capacity is 2,098 lbs/day. The 5-year projected annual average and maximum month loadings are 706 lbs/day and 1,085 lbs/day respectively.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 4-13-15 draft.doc

2

The interceptor is considered to have had adequate capacity to convey the maximum daily flow in 2014. The Hershey’s Mill and Hunt Country Pump stations are projected to have adequate capacity for the projected 2-year peak day flows.
WGSA
The 2014 annual average flow was 0.771 MGD, the 3-month maximum average flow was 0.930 MGD, and the maximum daily flow was 2.142 MGD. The 5-year projected annual average and maximum month flows are 0.827 MGD and 0.982 MGD respectively.
The interceptor had more-than-adequate capacity to convey the maximum daily flow in 2014. The Ashbridge and Barkway Pump Stations are projected to have adequate capacity for the projected 2-year peak day flows.

Semi-Annual I&I Report
We analyzed portable and permanent meter flows for the past 6-month period, and we prepared the semi-annual I&I report. We expect to issue the report on April 10th.

Lockwood Chase STP Closure NPDES Permit N.O.T.- We plan to perform a site visit to the former LCSTP site to evaluate the consistency of as-built conditions with the permit plans within the next month, so that the NPDES Permit Notice of Termination paperwork can be finalized and submitted to the Chester County Conservation District.

Hershey’s Mill PS and Marydell PS Diversions – The 2-year Maintenance Bonds on the Hershey’s Mill PS and Marydell PS Diversions expire in July and August respectively. We recommend warranty inspections be performed by May.

Hershey’s Mill PS Muffin Monster – we notified PADEP that the comminutor has been installed in the pump station for their field evaluation as required by the permit, but we have not received a response.

3. Big Fish Environmental Services –

Scott reported that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during February 2015. There was no discharge to Applebrook, which is identified as outfall 002. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous month. No mechanical or operational issues were observed during operation of the SBR and sludge dewatering equipment.
Significant storm/Hydraulic Loading Events – During March, there were 4 storm events resulting in daily precipitation amounts greater than 0.5 inches measured during a 24 hour period. A total of 4.4 inches of rainfall and 10.0 inches of snow were measured at the facility during March. Influent flows nearly doubled from a monthly average of 538,237 gpd to 841,790 gpd on March 4th, 836,410 gpd on March 16th and 902,200 gpd on March 14th.

Approval of Minutes

Jack moved to accept the minutes of March 9, 2015 as corrected. Fran seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 4-13-15 draft.doc

3

Approval of Invoices

1. Ed moved to approve payment of the following Pennoni invoices:

a. Pennoni #630705 $ 1,756.25
b. Pennoni #630706 $ 368.75
c. Pennoni #630707 $ 2,593.75
d. Pennoni #630893 $ 6,619.50
e. Pennoni #630894 $ 11,988.25
Dana seconded the motion. The motion passed unanimously.
2. Fran moved to approve payment of the following Gawthrop invoices:
a. Invoice #129252 for $660.00
b. Invoice #130320 for $480.00 for the audit
Dana asked about a $300 previous balance from the last meeting. Rick commented that this will pay it. Dana seconded the motion. The motion passed unanimously.

Liaison Reports

Board of Supervisors – Carmen mentioned that after this MA meeting tonight will be the Comp Plan meeting.

Financial Reports

Jon Altshul provided the following report:
In March, the Municipal Authority recorded $132 in revenues and $24,672 in expenses (including $8,292 for the quarterly overhead chargeback, $10,395 for Reservoir Rd Pump Station engineering and $5,685 for general engineering), for a variance of -$24,540. As of March 31, the fund balance was $1,551,504, of which $1,505,313 is in the construction account.

Goals

Jack reported that there was not enough space in the Newsletter for his article. He wrote a history of the sewer plant. He suggested that if there is nothing new, then no article will be done. Dana & Mike will work on an article about smoke testing. Articles are due May 1.

New Business

1. The quote from Lenni Electric for replacement of the existing protector is $4,168.85
The quote from Lenni Electric for a new TVSS for the UV System is $5,402.80.
Dana moved to approve purchase of a replacement for the existing protector for $4,168.85. Jack seconded the motion. The motion passed unanimously.
Fran moved to approve purchase of a new protector. Ed seconded. Discussion: Some surges are getting through the current protector although PECO says there are no surges. The need for a backup was discussed. This was tabled until the next meeting.

2. Wastewater Capacity Needs Evaluation Update - Pennoni evaluated and projected the potential maximum future wastewater flows throughout East Goshen Twp in the letter date February 9, 2007. The maximum township-wide future public wastewater flow was projected to be 1.736 MGD. This evaluation was the basis for the recent expansion of the RCSTP, several constructed pump stations and gravity sewer diversions, and the planned Reservoir road Pump Station diversion. This evaluation is over 8 years old and actual flows, existing connections and projected connections vary from that which was predicted in 2007. There is also interest from

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 4-13-15 draft.doc

4

adjacent municipalities to connect new development(s) and an existing development with failing on-lot systems to East Goshen’s sewer system. The Needs Evaluation needs to be revisited and updated to determine East Goshen’s current wastewater needs as well as the feasibility of additional connections from other municipalities. Pennoni anticipates the evaluation can be completed within 30 days of Notice to Proceed. Their estimated fee is $2,050.00. Rick will contact Willistown about reimbursement of the cost.

Adjournment

There being no further business, Jack moved to adjourn the meeting. Ed seconded the motion. The motion passed unanimously. The meeting was adjourned at 6:45 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 4-13-15 draft.doc

5

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 634359
Invoice Date : 04/29/2015
Project : EGMA1501
Project Name : 2015 General Services

For Services Rendered through: 4/19/2015

Authority Engineer provided documentation to PW Director on SBR #2 concrete repair coating materials and recommended lifting hole repair material; performed cursory review of 2007 Township-wide Needs Evaluation to identify potential updates to build-out flow projections; coordinated revisions to Township-wide sewage basins' exhibit for Comprehensive Plan Update; coordinated RCSTP UV ballast and surge protection evaluation with staff and Twp including a site visit to RCSTP; prepared April's Engineer's Report; and prepared for and attended April's MA meeting.

Staff Engineer assisted with evaluation of the RCSTP UV ballasts and surge protection issues.

Senior Engineering Technician coordinated with the manufacturer, Authority Engineer, and PW Director on Sika repair product alternatives for SBR #2 lifting hole repairs; and observed UV ballast and surge protection issues on field recon to the RCSTP.

Engineering Technician II prepare the sewer basins' exhibit revisions for the Comprehensive Plan Update.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,869.00
Expense : 0.00
Phase Total : 1,869.00
Amount Due This Invoice $1,869.00
Fee : 12,000.00
Prior Billings : 3,723.75
Current Billings : 1,869.00
Total Billings : 5,592.75

[Handwritten note: ok RS 5/8]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1501 -- 2015 General Services

Invoice # : 634359

...Continued from previous page

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 11.50 115.00 1,322.50
Staff Engineer 2.00 90.00 180.00
Senior Engineering Technician 2.50 85.00 212.50
Engineering Technician II 2.00 77.00 154.00
Labor Total: 18.00 1,869.00
Total Phase : **** -- Professional Services Labor : $1,869.00
Expense : $0.00
Total Project : EGMA1501 -- 2015 General Services Labor : $1,869.00
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.
Page: 2

East Goshen Municipal Authority
EGMA1501 Invoice Summary
Invoice Date 04/29/2015

Project: EGMA1501
Pennoni Job No.: 2015 General Services
Invoice No: 634359
Invoice Period: 3/23/2015 to 4/19/2015
Date: 4/29/2015

Initial Authorization: $ 12,000.00
Contract Amount: $ 12,000.00
Previously Invoiced: $ 3,723.75
Current Invoice: $ 1,869.00
Invoiced to Date ($): $ 5,592.75
Invoiced to Date (%): 47%
Remaining Budget ($): $ 6,407.25
Remaining Budget (%): 53%

Budget by Phase:

Phase Name: 2015 General Services
Phase Budget: $ 12,000.00
Previously Invoiced: $ 3,723.75
Current Invoice: $ 1,869.00
Invoiced to Date ($): $ 5,592.75
Invoiced to Date (%): 47%
Remaining Budget ($): $ 6,407.25
Remaining Budget (%): 53%

Comments: Authority Engineer provided documentation to PW Director on SBR #2 concrete repair coating materials and recommended lifting hole repair material; performed cursory review of 2007 Township-wide Needs Evaluation to identify potential updates to build-out flow projections; coordinated revisions to Township-wide sewage basins' exhibit for Comprehensive Plan Update; coordinated RCSTP UV ballast and surge protection evaluation with staff and Twp including a site visit to RCSTP; prepared April's Engineer's Report; and prepared for and attended April's MA meeting.

Staff Engineer assisted with evaluation of the RCSTP UV ballasts and surge protection issues.

Senior Engineering Technician coordinated with the manufacturer, Authority Engineer, and PW Director on Sika repair product alternatives for SBR #2 lifting hole repairs; and observed UV ballast and surge protection issues on field recon to the RCSTP.

Engineering Technician II prepare the sewer basins' exhibit revisions for the Comprehensive Plan Update.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 634360
Invoice Date : 04/29/2015
Project : EGMA1502
Project Name : 2015 Semi-Annual I&I Reports

For Services Rendered through: 4/19/2015

Analyzed portable and permanent meter data for the prior 6-month period; coordinated metering locations and recommendations with PW staff; and prepared and submitted Semi-Annual I&I Report #13.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 3,622.50
Expense : 0.00
Phase Total : 3,622.50
Amount Due This Invoice $3,622.50
Fee : 10,500.00
Prior Billings : 2,422.50
Current Billings : 3,622.50
Total Billings : 6,045.00

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 6.00 115.00 690.00
Associate Engineer 34.50 85.00 2,932.50
Labor Total: 40.50 3,622.50
Total Phase : **** -- Professional Services Labor : $3,622.50
Expense : $0.00
Total Project : EGMA1502 -- 2015 Semi-Annual I&I Reports Labor : $3,622.50
Expense : $0.00

[Handwritten note: ok RS 5-8]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1502 Invoice Summary
Invoice Date 04/29/2015

Project: EGMA1502
Pennoni Job No.: 2015 Semi-Annual I&I Reports
Invoice No: 634360
Invoice Period: 3/23/2015 to 4/19/2015
Date: 4/29/2015

Initial Authorization: $ 10,500.00
Contract Amount: $ 10,500.00
Previously Invoiced: $ 2,422.50
Current Invoice: $ 3,622.50
Invoiced to Date ($): $ 6,045.00
Invoiced to Date (%): 58%
Remaining Budget ($): $ 4,455.00
Remaining Budget (%): 42%

Budget by Phase:

Phase Name: 2015 Semi-Annual I&I Reports
Phase Budget: $ 10,500.00
Previously Invoiced: $ 2,422.50
Current Invoice: $ 3,622.50
Invoiced to Date ($): $ 6,045.00
Invoiced to Date (%): 58%
Remaining Budget ($): $ 4,455.00
Remaining Budget (%): 42%

Comments: Analyzed portable and permanent meter data for the prior 6-month period; coordinated metering locations and recommendations with PW staff; and prepared and submitted Semi-Annual I&I Report #13.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 634361
Invoice Date : 04/29/2015
Project : EGMA1503
Project Name : 2014 Chapter 94 Reports

For Services Rendered through: 4/19/2015

Finalized and submitted Chapter 94 Reports to PADEP for the RCSTP, West Goshen Service Area, and Westtown Service Area.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 4,645.00
Expense : 0.00
Phase Total : 4,645.00
Amount Due This Invoice $4,645.00
Fee : 14,800.00
Prior Billings : 8,800.00
Current Billings : 4,645.00
Total Billings : 13,445.00

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 16.00 115.00 1,840.00
Associate Engineer 33.00 85.00 2,805.00
Labor Total: 49.00 4,645.00
Total Phase : **** -- Professional Services Labor : $4,645.00
Expense : $0.00
Total Project : EGMA1503 -- 2014 Chapter 94 Reports Labor : $4,645.00
Expense : $0.00

[Handwritten note: ok RS 5/8]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1503 Invoice Summary
Invoice Date 04/29/2015

Project: EGMA1503
Pennoni Job No.: 2015 Chapter 94 Reports
Invoice No: 634361
Invoice Period: 3/23/2015 to 4/19/2015
Date: 4/29/2015

Initial Authorization: $ 14,800.00
Contract Amount: $ 14,800.00
Previously Invoiced: $ 8,800.00
Current Invoice: $ 4,645.00
Invoiced to Date ($): $ 13,445.00
Invoiced to Date (%): 91%
Remaining Budget ($): $ 1,355.00
Remaining Budget (%): 9%

Budget by Phase:

Phase Name: 2015 Chapter 94 Reports
Phase Budget: $ 14,800.00
Previously Invoiced: $ 8,800.00
Current Invoice: $ 4,645.00
Invoiced to Date ($): $ 13,445.00
Invoiced to Date (%): 91%
Remaining Budget ($): $ 1,355.00
Remaining Budget (%): 9%

Comments: Finalized and submitted Chapter 94 Reports to PADEP for the RCSTP, West Goshen Service Area, and Westtown Service Area.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 634362
Invoice Date : 04/29/2015
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting

For Services Rendered through: 4/19/2015

Phase 09 - Continued with progress design for pump station site, pumping and mechanical components, electrical systems, controls, building structural and architectural, force main alignment; and continued with plan preparation including cover sheet existing conditions plans, site plans, building plans and sections, electrical schematics, and details; and Authority Engineer and Senior Engineering Technician performed field recon to observe site and conditions at existing Ashbridge Pump Station for design consistency where possible.

Phase 10 - Performed two double-ring infiltrometer infiltration tests and coordinated with PW Dept to excavate associated test pits in several locations on-site. Prepared infiltration testing report. FINAL INVOICE FOR PHASE 10.

Phase : 09 -- Progress Design

Total Phase : 09 -- Progress Design Labor : 4,837.00
Expense : 0.00
Phase Total : 4,837.00

Phase : 10 -- Infiltration Testing

Total Phase : 10 -- Infiltration Testing Labor : 1,800.00
Expense : 0.00
Phase Total : 1,800.00
Amount Due This Invoice $6,637.00
Fee : 68,600.00
Prior Billings : 22,314.50
Current Billings : 6,637.00
Total Billings : 28,951.50

[Handwritten note: ok RS 5/8]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1504 -- Reservoir Rd PS Design & Permitting

Invoice # : 634362

...Continued from previous page

Phase : 09 -- Progress Design
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 3.50 115.00 402.50
Senior Engineer 4.00 110.00 440.00
Project Engineer 14.50 97.00 1,406.50
Staff Engineer 3.00 90.00 270.00
Senior Engineering Technician 1.00 85.00 85.00
Engineering Technician II 29.00 77.00 2,233.00
Labor Total: 55.00 4,837.00
Total Phase : 09 -- Progress Design Labor : $4,837.00
Expense : $0.00

Phase : 10 -- Infiltration Testing
Labor

Class Hours/
Units
Rate Amount
Senior Engineer 4.00 110.00 440.00
Staff Engineer 6.00 90.00 540.00
Engineering Technician I 12.25 67.00 820.75
Labor Total: 22.25 1,800.75
Total Phase : 10 -- Infiltration Testing Labor : $1,800.75
Expense : $0.00
Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting Labor : $6,637.75
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.
Page: 2

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 04/29/2015

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 634362 & 634363
Invoice Period: 3/23/2015 to 4/19/2015
Date: 4/29/2015

Initial Authorization: $ 103,920.00
Contract Amount: $ 103,920.00
Previously Invoiced: $ 34,302.75
Current Invoice: $ 15,826.50
Invoiced to Date ($): $ 50,129.25
Invoiced to Date (%): 48%
Remaining Budget ($): $ 53,790.75
Remaining Budget (%): 52%

Budget by Phase:

Phase Name: Progress Design Phase 09
Phase Budget: $ 39,100.00
Previously Invoiced: $ 2,522.00
Current Invoice: $ 2,522.00
Invoiced to Date ($): $ 4,837.00
Invoiced to Date (%): 12%
Remaining Budget ($): $ 34,263.00
Remaining Budget (%): 88%

Comments: Phase 09 - Continued with progress design for pump station site, pumping and mechanical components, electrical systems, controls, building structural and architectural, force main alignment; and continued with plan preparation including cover sheet, existing conditions plans, site plans, building plans and sections, electrical schematics, and details; and Authority Engineer and Senior Engineering Technician performed field recon to observe site and conditions at existing Ashbridge Pump Station for design consistency where possible.

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 04/29/2015

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 634362 & 634363
Invoice Period: 3/23/2015 to 4/19/2015
Date: 4/29/2015

Initial Authorization: $ 103,920.00
Contract Amount: $ 103,920.00
Previously Invoiced: $ 34,302.75
Current Invoice: $ 15,825.75
Invoiced to Date ($): $ 50,128.50
Invoiced to Date (%): 48%
Remaining Budget ($): $ 53,791.50
Remaining Budget (%): 52%

Budget by Phase:

Phase Name: Infiltration Testing Phase 10
Phase Budget: $ 1,800.00
Previously Invoiced: $ -
Current Invoice: $ 1,800.00
Invoiced to Date ($): $ 1,800.00
Invoiced to Date (%): 100%
Remaining Budget ($): $ -
Remaining Budget (%): 0%

Comments: Phase 10 - Performed two double-ring infiltrometer infiltration tests and coordinated with PW Dept to excavate associated test pits in several locations on-site. Prepared infiltration testing report. FINAL INVOICE FOR PHASE 10.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 634363
Invoice Date : 04/29/2015
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting

For Services Rendered through: 4/19/2015

Phase 03 - Continued field survey along the remainder of Bow Tree Drive and along Anne and Misak Drives including easement area between Anne and Misak Drives; continued preparation of existing conditions and topography plans based upon completed survey data.

Phase : 03 -- Existing Conditions Survey

Contract Amount $23,300.00
Percent Complete 94.48%
Contract Amount Completed $22,013.75
Less Previous Billed $(12,825.00)
Phase Subtotal $9,188.75
Amount Due This Invoice $9,188.75

[Handwritten note: ok RS 5-8]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 04/29/2015

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 634362 & 634363
Invoice Period: 3/23/2015 to 4/19/2015
Date: 4/29/2015

Initial Authorization: $ 103,920.00
Contract Amount: $ 103,920.00
Previously Invoiced: $ 34,302.75
Current Invoice: $ 15,826.50
Invoiced to Date ($): $ 50,129.25
Invoiced to Date (%): 48%
Remaining Budget ($): $ 53,790.75
Remaining Budget (%): 52%

Budget by Phase:

Phase Name: Existing Conditions Survey Phase 03
Phase Budget: $ 23,300.00
Previously Invoiced: $ 12,825.00
Current Invoice: $ 9,188.75
Invoiced to Date ($): $ 22,013.75
Invoiced to Date (%): 94%
Remaining Budget ($): $ 1,286.25
Remaining Budget (%): 6%

Comments: Phase 03 - Continued field survey along the remainder of Bow Tree Drive and along Anne and Misak Drives including easement area between Anne and Misak Drives; continued preparation of existing conditions and topography plans based upon completed survey data.

Project : EGMA1504 -- Reservoir Rd PS Design & Permitting

Invoice # : 634362

...Continued from previous page

Phase : 09 -- Progress Design
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 3.50 115.00 402.50
Senior Engineer 4.00 110.00 440.00
Project Engineer 14.50 97.00 1,406.50
Staff Engineer 3.00 90.00 270.00
Senior Engineering Technician 1.00 85.00 85.00
Engineering Technician II 29.00 77.00 2,233.00
Labor Total: 55.00 4,837.00
Total Phase : 09 -- Progress Design Labor : ,837.00
Expense : bash.00

Phase : 10 -- Infiltration Testing
Labor

Class Hours/
Units
Rate Amount
Senior Engineer 4.00 110.00 440.00
Staff Engineer 6.00 90.00 540.00
Engineering Technician I 12.25 67.00 820.75
Labor Total: 22.25 1,800.75
Total Phase : 10 -- Infiltration Testing Labor : ,800.75
Expense : bash.00
Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting Labor : ,637.75
Expense : bash.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.
Page: 2

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA April Financial Reports
Date: May 5, 2015

In April, the Municipal Authority recorded 4,423 in revenues (including two Ridley Creek tap-in fees for construction on Colonial Lane) and 4,167 in expenses (including 8,608 for Reservoir Rd Pump Station engineering and ,719 for general engineering), for a variance of -,744. As of April 30th, the fund balance was ,541,760, of which ,486,828 is in the construction account.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2015

Account Title Acct # Annual
Budget
Month To Date
Actual
Year To Date
Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 1,551,503.88
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 1,600.00 125.90 508.22
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 1,600.00 125.90 508.22
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00
TOTAL EXPENSES 0.00 0.00 0.00
RCSTP NET RESULT 1,600.00 125.90 508.22

U:\bmccool\2015\Municipal Authority\2015 - 04 - Municipal Authority Report.xlsx
Page 1 of 3
05/04/2015

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2015

Account Title Acct # Annual
Budget
Month To Date
Actual
Year To Date
Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS 07341 1000 15.00 0.61 4.25
C.C. TAPPING FEES 07364 1100 0.00 0.00 0.00
R.C.TAPPING FEES 07364 1110 14,296.00 14,296.00 14,296.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 845.64
MISCELLANEOUS REVENUE 07380 1000 0.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 105,105.00 0.00 0.00
TOTAL REVENUE 119,416.00 14,296.61 15,569.25
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 33,323.00 0.00 8,292.10
MISCELLANEOUS EXPENSE 07424 3000 3,000.00 0.00 1,450.00
MUNIC.AUTH.-AUDITING 07424 3110 10,984.00 0.00 0.00
ENGINEERING SERVICES 07424 3130 37,300.00 4,718.75 17,236.75
LEGAL SERVICES 07424 3140 9,000.00 840.00 1,140.00
M.C.-DVRFA-DEBT SERVICE 07471 1000 23,240.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 4,169.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 0.00 0.00 0.00
TOTAL EXPENSES 121,016.00 5,558.75 28,118.85
OPERATING NET RESULT (1,600.00) 8,737.86 (12,549.60)

U:\bmccool\2015\Municipal Authority\2015 - 04 - Municipal Authority Report.xlsx
Page 2 of 3
05/04/2015

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2015

Account Title Acct # Annual
Budget
Month To Date
Actual
Year To Date
Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07393 1001 0.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 0.00 0.00 0.00
TOTAL REVENUE 0.00 0.00 0.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 0.00 0.00 0.00
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 0.00 0.00 0.00
MANHOLE COVER REPLACEMENTS 07424.7405 0.00 0.00 0.00
C.C. CAPITAL - COLLECTION 07424.7420 0.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 0.00
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 0.00 0.00 0.00
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 0.00
HERSHEY MILL STATION - ENGINEER 07426 1000 0.00 0.00 0.00
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 0.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 0.00 0.00 0.00
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 0.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 100,000.00 18,607.75 35,375.25
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
TOTAL EXPENSES 100,000.00 18,607.75 35,375.25
CAPITAL NET RESULT (100,000.00) (18,607.75) (35,375.25)
MUNICIPAL AUTHORITY ENDING FUND BALANCE 1,541,759.89

U:\bmccool\2015\Municipal Authority\2015 - 04 - Municipal Authority Report.xlsx
Page 3 of 3
05/04/2015

East Goshen Township General Ledger
Report Date 05/04/15 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 11 : 46 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1501 JE 46156 1.44 02/03/15 INTEREST INTEREST EARNED JANUARY 2015
07 FUND
0.00 1.44 -1.44
1502 46526 1.17 03/02/15 INTEREST INTEREST EARNED FEBRUARY 2015
07 FUND
0.00 1.17 -2.61
1503 46944 1.03 04/02/15 INTEREST INTEREST EARNED MARCH 2015
07 FUND
0.00 1.03 -3.64
1504 47407 0.61 05/04/15 INTEREST INTEREST EARNED APRIL 2015
07 FUND
0.00 0.61 -4.25
0.00 4.25 -4.25
07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00
1501 46156 131.97 02/03/15 INTEREST INTEREST EARNED JANUARY 2015
07 FUND
0.00 131.97 -131.97
1502 46526 119.08 03/02/15 INTEREST INTEREST EARNED FEBRUARY 2015
07 FUND
0.00 119.08 -251.05
1503 46944 131.27 04/02/15 INTEREST INTEREST EARNED MARCH 2015
07 FUND
0.00 131.27 -382.32
1504 47407 125.90 05/04/15 INTEREST INTEREST EARNED APRIL 2015
07 FUND
0.00 125.90 -508.22
0.00 508.22 -508.22
07364-1110 R.C.TAPPING FEES 0.00
CR 47236 7,148.00 04/21/15 1123 7875 1 SUNNY RIDGE FARMS LLC
47278 7,148.00 04/23/15 1128 7875 1 SUNNY RIDGE FARMS LLC
0.00 14,296.00 -14,296.00
0.00 14,296.00 -14,296.00

East Goshen Township General Ledger
Report Date 05/04/15 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 11 : 46 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07364-1130 CONNECTION FEES - SEWER 0.00
1501 423.00 01/16/15 789 8648 1 GEORGE SMITH & CHRISTINA CONLE
JE 45968 141.12 01/16/15 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
141.12 423.00 -281.88
1502 CR 46296 423.00 02/13/15 248 8650 1 JACOBS, ROBERT & CHERYL
46479 423.00 02/26/15 2381 8649 1 STOFFLET, MICHAEL
JE 46297 141.12 02/13/15 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
46480 141.12 02/26/15 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
282.24 846.00 -845.64
423.36 1,269.00 -845.64
07380-1000 MISCELLANEOUS REVENUE 0.00
1501 45968 141.12 01/16/15 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 141.12 -141.12
1502 46297 141.12 02/13/15 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
46480 141.12 02/26/15 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 282.24 -423.36
0.00 423.36 -423.36
07424-1400 ADMINISTRATIVE WAGES 0.00
1503 CD 46874 8,292.10 03/30/15 2267 425 EAST GOSHEN TOWNSHIP - GENERAL
1ST QTR.2015 REIMBURS. FR: MUN.A
8,292.10 0.00 8,292.10
8,292.10 0.00 8,292.10
07424-3000 MISCELLANEOUS EXPENSE 0.00
1501 45777 950.00 01/02/15 2260 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2015 ACTIVE MEMBERSHIP DUES
46110 500.00 01/29/15 2263 2737 COMMONWEALTH OF PA
ANNUAL FEE - NPDES PERMIT -CHAP.
1,450.00 0.00 1,450.00
1,450.00 0.00 1,450.00
07424-3130 ENGINEERING SERVICES 0.00
45953 621.50 01/15/15 2261 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/7/14 GENERAL

East Goshen Township General Ledger
Report Date 05/04/15 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 11 : 46 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1501 CD 46013 640.00 01/22/15 2262 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 11/9/14 GEN.SERVICE
1,261.50 0.00 1,261.50
1502 46311 5,571.50 02/13/15 2264 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/18/15 2014 CHAP.
5,571.50 0.00 6,833.00
1503 46649 5,685.00 03/12/15 2266 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/15/15 2014 CHAP.
5,685.00 0.00 12,518.00
1504 47119 4,718.75 04/15/15 2269 1052 PENNONI ASSOCIATES INC.
SERV. THRU 3/22/15 2015 GEN.SER
4,718.75 0.00 17,236.75
17,236.75 0.00 17,236.75
07424-3140 LEGAL SERVICES 0.00
1503 46649 300.00 03/12/15 2265 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - 1/12/15 GEN.AUT
300.00 0.00 300.00
1504 47119 840.00 04/15/15 2268 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 2/6-2/9/15 GEN.AUT
840.00 0.00 1,140.00
1,140.00 0.00 1,140.00
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1501 45954 137.50 01/15/15 10029 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/7/14 RESERV.RD ACT
46014 852.50 01/22/15 10030 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 11/9/14 RESERVOIR R
ACT.537
990.00 0.00 990.00
1502 46312 5,382.80 02/13/15 10031 1052 PENNONI ASSOCIATES INC.
SERV.THRU 1/18/15 RESERVOIR RD.P
ACT 537 PLANNING
5,382.80 0.00 6,372.80
1503 46650 10,394.70 03/12/15 10032 1052 PENNONI ASSOCIATES INC.
SERV. THRU 2/15/15 RESERVOIR RD.
10,394.70 0.00 16,767.50

East Goshen Township General Ledger
Report Date 05/04/15 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 11 : 46 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07428-1000 1504 CD 47120 18,607.75 04/15/15 10033 1052 PENNONI ASSOCIATES INC.
SERV. THRU 3/22/15 RESERVOIR RD.
DESIGN & PERMITTING
18,607.75 0.00 35,375.25
35,375.25 0.00 35,375.25
Beg Bal 0.00 63,917.46 16,500.83 47,416.63

LENNI
ELECTRIC
CORPORATION

February 13, 2015

East Goshen Township
1580 Paoli Pike
West Chester, PA. 19380

Attn: Mr. Mark Miller

Re: Ridley Creek WWTP – TVSS for UV System

We offer a T & M budget price of ,402.80 for the following electrical work at the above referenced location. Our price includes:

  • 1 – Install new GE TPR7120S12WMNID TVSS in control room after the transformer install, ahead of the UV system controls install
  • LS – Rework pipe and wire
Materials ,092.00
15% 13.80
Labor mechanic 5 hrs. @ 5.50 77.50
Labor apprentice 5 hrs. @ 8.50 92.50
Service Truck 7.00
,402.80

If you have any questions, please do not hesitate to contact me directly @ 610-636-6511.

Sincerely,

LENNI ELECTRIC CORPORATION
[Signature]
James C. Hallman, Jr.
C & I Division

1020 ANDREW DRIVE WEST CHESTER, PA 19380 • 610-436-9922 • FAX 610-436-9926
AN EQUAL OPPORTUNITY EMPLOYER M/F/V

RCSTP UPGRADE & EXPANSION - NEW SINGLE LINE DIAGRAM (Drawing E-6)

Annotated electrical single line diagram for the Ridley Creek Sewage Treatment Plant (RCSTP) Upgrade & Expansion for East Goshen Municipal Authority, prepared by Pennoni Associates Inc., showing power distribution, TVSS surge protection locations, and load flow to the UV system.

Annotations and Callouts

  • GANG OPERATED SWITCH
  • LIGHTNING ARRESTERS
  • FUSES
  • Exterior TVSS on PECO service. Protects entire RCSTP from PECO surges. This one has the 19 surges.
  • 2 other TVSS units in Plant (unrelated to UV ballasts)
  • LOAD FLOW TO UV SYSTEM
  • GENERATOR LOAD FLOW TO UV SYSTEM
  • Internal surge can occur as transfer switch switches. ATS provides phase protection.
  • Transformer dissipates energy and can provide limited surge relief
  • This one is actually within the MCC and provides protection to entire MCC3 bus including UV system.
  • NOT USED (marked at feeder F-1 and UH-4)

Major Diagram Components and Labels

  • PECO Service: Utility Pole #5, New Utility Pole #4, New Utility Pole #3; New 35KV Overhead Line 3#1/0 ACSR and 1#1/0 ACSR Neutral and Relocation of Existing Telephone and Fiber Optic Cables; Underground 3#1/0 (35KV Shielded), 1#2(500V), ST. and 1-5"C Spare; Coordinate with PECO for final location of C.T. and P.T.
  • Main Transformer & Switchboard: 35KV 1000KVA Pad Mounted Transformer 480V/277V; C.T., P.T., PECO Meter; 1600A MDP (Main Distribution Switch Board) 1600A, 480Y/277V, 3PH, 4W, 2000A CU. BUS, 65KAIC; TVSS.
  • Existing Service & Generator 1: Change Existing KLU-400A Fuses to New KLPC-600A Fuses; Existing 600A Main Disconnect; Existing 800A ATS-1; Existing 400KW/500KVA Generator-1.
  • Generator 2: 500KW/625KVA 480V Generator-2; 1000A ATS-2.
  • MCC-1 (Existing): 480Y/277V, 3PH, 4W, 600A CU. BUS, 42KAIC; Panel 'PB1'; Blowers B-01, B-02, B-03, B-41; Inside Lighting; Outside Lighting.
  • MCC-2: 480Y/277V, 3PH, 4W, 600A CU. BUS, 42KAIC; Influent Pump Station (P-11, P-12, P-13); Filter Feed Pumps (P-41, P-42, P-43); Screen Building; Odor Air Fan; Bldg. 1 Panel; Inside Lighting; Outside Lighting; TVSS; SBR Blower Building Blower Room (BL-21, BL-22, BL-23, BL-24, BL-25).
  • MCC-3: 480Y/277V, 3PH, 4W, 1200A CU. BUS, 42KAIC; Jet Mixer Pumps SBR Tanks (P-21, P-22, P-23, P-24); WAS Transfer Pumps SBR Tanks (P-25, P-26, P-27, P-28); Floc Tank Mixer; UVCP #1, UVCP #2; SBR Panel; FDP #1, FDP #2; Utility Water Pumps Effluent Storage Tank (P-71, P-72); UMCP; TVSS.
  • CCPP: 480Y/277V, 3PH, 4W, 400A CU. BUS, 42KAIC; TVSS; Overhead Door; Panel CBH.
  • Note 1: Provide as part of DE No. 4 (Deduct).

Title Block

  • Engineer: Pennoni Associates Inc., One Drexel Plaza, 3001 Market Street Phila., Pa. 19104, Consulting Engineers
  • Project: RCSTP UPGRADE & EXPANSION, TOWNE DRIVE, EAST GOSHEN TOWNSHIP
  • Drawing Title: NEW SINGLE LINE DIAGRAM
  • Client: EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19383
  • Professional Engineer Seal: David M. Ficht, PE-043537-E, Commonwealth of Pennsylvania
  • Revision 1 (10/22/09, by TD): Added new/existing designation, revised P44B, P45B to 1/2 HP, added Note 1
  • Scale: None | Drawn By: M.B. | Date: 7/02/08 | Approved: D.M.F. | Job No.: EGMA 0707 | Drawing No.: E-6 | Sheet 73 of 86

April 29, 2015

East Goshen Comprehensive Plan 2015

Dear ABC members,

The Comprehensive Plan Task Force, with assistance from all the ABCs, has been working for many months with multiple consultants to prepare the 2015 Comprehensive Plan. At times, it has seemed to be a never-ending process, but the end is finally in sight!

Tom Comitta is planning several meetings to get input from different sources on the latest draft of the Plan. The presentation to the ABCs is scheduled for Wednesday, June 10, 2015 at 7:00 pm. I realize that date conflicts with a Conservancy meeting so if you cannot attend on Wednesday, you may want to attend the presentation to the general public on the following evening.

I hope you will all come to see what your efforts have created and to offer comments so we produce an outstanding and usable Plan. The goal is to have the Plan approved before the end of this year.

Thanks for all your help.

Janet Emanuel
Chair, Comp Plan Task Force

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\CPTF 2015 ABC ltr.doc