Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
January 11, 2016
7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s
  4. APPROVAL OF MINUTES December 14, 2015
  5. APPROVAL OF INVOICES Pennoni Invoice #668503 ,063.75; Pennoni Invoice #668504 6,747.75
  1. LIAISON REPORTS
  2. FINANCIAL REPORTS December 2015 Report
  3. OLD BUSINESS
  4. GOALS Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements.; Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively “I&I”) Plan to reduce the amount of I&I into the sewer system.; Respond to capacity requests within 45 days. Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations.; Submit topical articles of interest for the East Goshen newsletter.

F:\Data\Shared Data\Agendas\Municipal Authority6-11-16.doc

  1. Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance.
  1. NEW BUSINESS
  2. CAPACITY REQUESTS
  3. ANY OTHER MATTER Semi-Annual Sewer System Status Report #14
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority6-11-16.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

Jaunuary 8, 2016

To:Municipal Authority
From:Mark Miller
Re:December 2015 Monthly Report

Meters: We checked all meters once a week, no problems to report.
Average Flow – 780,000
December percipitation – 5.02

C.C. Collection: The pumping stations were visited on a daily basis. All stations had preventive maintenance performed by Lenni Electric. John Laidly was out to perform routine maintenance to the electronics. We replaced three back-up floats at Barkway Station.
We televised several laterals to check for infiltration we also replaced several broken vent stacks (see picture).
We added additional conduit at the Hershey Mill station for the larger pump cords.
The Public Works Crew replaced three manhole castings that we found taking in inflow.

R.C. Collection: All pump stations were visited on a routine basis , the rail system will need to be replaced this year. I sent the info out to Seely Associates. I contacted Allied Control for the installation of meters on the Ridley Creek System. We are planning on starting the smoke testing in February.

R.C. Plant: Routine maintenance was performed at the plant, all buildings were cleaned from top to bottom. Floors were prepared for sealing.

Alarms: We responded to 6 alarms for December.

PA One Calls: We received 65 PA One calls for December.

[Photograph showing a vertical white PVC sewer lateral cleanout pipe in grass with a large broken hole near its base and broken concrete pieces on the ground beside it.]

Broken Lateral
Body Shop
RT 3 + Reservoir Rd.
on chester creek

EGMA 1601

[Logo: Pennoni]

M E M O R A N D U M

TO:East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM:Michael Ellis, P.E.
Authority Engineer
DATE:January 7, 2016
SUBJECT:Engineer’s Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • No activity since the last report.

Reservoir Road Pump Station

  • Application packages were submitted on November 19, 2015 to PADEP for the Ridley Creek GP-5 “Utility Line Stream Crossings” and GP-8 “Temporary Road Crossings (across streams)” permits and for the Chester Creek Small Projects Joint Permit for the pump station site and Chester Creek utility crossing. We are awaiting PADEP response.
  • The Township Codes Department reviewed the plans and provided a few comments that we have addressed.
  • Williams-Transco and Sunoco have approved the petroleum pipeline crossings. We are awaiting a response from PPL-IEC.
  • The PennDOT Highway Occupancy Permit application for force main construction along and across E. Strasburg Road and Rt. 352, including detour route plans for road closures, was submitted on December 22, 2015.
  • We met with the Chester County Conservation District (CCCD) on December 22, 2015 to discuss their initial comments on the NPDES Permit application. We are editing the plans and permit application documents to address the comments, and we expect to submit the revised documents to CCCD by January 15, 2016.
  • The Water Quality Management Part II Permit application will be submitted to PADEP after the plans are revised to address CCCD’s comments.

Page 1 of 2

P:\Projects\EGMA\Memos to Board6\Memo to EGMA Board 2016-01-07.docx

EGMA 1601

  • The tentative schedule follows: Estimated Date Submitted PADEP GP and JP Permit applications November 19, 2015 Submitted NPDES Permit application December 7, 2015 Submitted PennDOT HOP application for force main December 22, 2015 Submit revised NPDES Permit application January 15, 2016 Submit PADEP WQM Part II Permit application January 20, 2016 PennDOT Permit issuance January 2016 PADEP and CCCD Permit issuances March-April 2016

Semi-Annual I&I Reports

  • We analyzed portable and permanent meter data and prepared Semi-Annual Sewer System Status Report #14, which was submitted on January 7, 2016.

RCSTP and Pump Stations’ O&M Plan

  • We are preparing an outline of proposed content for the O&M Plan that will be submitted to the Township for review the week of January 11-15, 2016.

New Connections

  • We reviewed a revised grinder pump plan submission for a proposed new house on a subdivided parcel at 930 N. Chester Road.

Page 2 of 2

P:\Projects\EGMA\Memos to Board6\Memo to EGMA Board 2016-01-07.docx

[Logo: Big Fish Environmental Services Inc.]

Monthly Operations Report: December 2015

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during November 2015. Discharge to Applebrook was discontinued during November. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment.

Treatment Process Operation

During November 2015, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average concentration of 0.28 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the November 2015 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.10 mg/L to 0.44 mg/L. The aluminum sulfate daily average slightly decreased to 80.9 gpd as compared to November’s average of 83.2 gpd.

Table 1

November 2015 - Final Effluent - Out Fall 001

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus,Total
, mg/L
Fecal Coliform
MGD Average mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
Geo
Mean
Geo
Mean
0.75 20 125 10 131 7 44 0.5 3 200 1,000
Instantaneous
Maximum
40 42
Sample Date
November 3, 2015 0.285 2.5 5.9 7 17 0.545 1.30 0.25 0.59 3 0.4771
November 5, 2015 0.282 6 14
November 10, 2015 0.296 2.8 6.9 10 25 0.340 0.84 0.44 1.09 2 0.3010
November 12, 2015 0.324 6
November 17, 2015 0.299 2.0 6 15 0.410 0.34 1
November 19, 2015 0.315 5 13
November 24, 2015 0.336 2.3 6.4 1 3 0.26 0.71 0.10 0.28 1 0.0000
November 26, 2015 0.352 5 15
November 30, 2015 0.325 5 14
Average 0.313 2.4 6.4 6 14 0.388 0.95 0.28 0.65 2 0.2594
Minimum 0.282 2.0 5.9 1 3 0.255 0.71 0.10 0.28 1 0.0000
Maximum 0.352 2.8 6.9 10 25 0.545 1.30 0.44 1.09 3 0.4771

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 6

[Logo: Big Fish Environmental Services Inc.]

Discharge to Applebrook, Outfall 002, continued to remain off line during November 2015. Table 2 illustrates the influent composite sample data reported for the November 2015

Table 2

November 2015 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total,
mg/L
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
November 3, 2015 0.373 270 840 251 781 35.0 109 49.2 153 6.6 21
November 10, 2015 0.372 122 380 192 597 44.0 137 49.6 154 6.0 19
November 17, 2015 0.360 210 653 288 896 54.9 171 74.7 224 8.3 26
November 24, 2015 0.391 97.6 304 140.0 436 49.4 154 54.8 179 5.5 17
Average 0.374 175 544 218 678 45.8 143 57.1 177 6.6 21
Minimum 0.360 98 304 140 436 35.0 109 49.2 153 5.5 17
Maximum 0.391 270 840 288 896 54.9 171 74.7 224 8.3 26

Table 3 presents the available Outfall 001 final effluent data for the month of December 2015. During December, the presence of foam conditions on the surface of the SBRs remained consistent with the previous month with foam concentrations ranging from 50% to 80% of the area. This is attributed to decreasing water temperatures supporting conditions for growth of filamentous bacteria. Increasing the F:M ratio and decreasing MLSS concentrations is employed to assist in managing the increase in filamentous growth.

During December, there are no anticipated exceedances of the permitted limitations for Outfall 001. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 6

[Logo: Big Fish Environmental Services Inc.]

Table 3

December 2015 - Final Effluent - Out Fall 001

Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 10 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
December 1, 2015 0.337 2.3 6.5 7 20 1.220 3.43 0.10 0.28 4 0.6021
December 4, 2015 0.345 7 20
December 8, 2015 0.324 2.7 7.3 8 22 0.389 1.05 0.10 0.27 5 0.6990
December 9, 2015 0.313 3 8
December 10, 2015 0.304 3 8
December 15, 2015 0.333 2.0 5.6 2 6 0.847 2.35 0.26 0.72 270 2.4314
December 17, 2015 0.316 1 3
December 22, 2015 0.264 2.0 4.4 5 11 0.39 0.85 0.17 0.37 1 0.0000
December 24, 2015 0.459
December 29, 2015 0.514
December 30, 2015 0.393
Average 0.355 2.3 5.9 5 12 0.710 1.92 0.16 0.41 9 0.9331
Minimum 0.264 2.0 4.4 1 3 0.385 0.85 0.10 0.27 1 0.0000
Maximum 0.514 2.7 7.3 8 22 1.220 3.43 0.26 0.72 270 2.4314

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings, with exception of the total phosphorus loading on December 22nd. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during December 2015.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 6

[Logo: Big Fish Environmental Services Inc.]

Table 4

December 2015 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
December 4, 2015 0.452 162 611 1 4 45.5 172 52.4 198 7.7 29
December 8, 2015 0.368 175 660 214 807 33.3 126 57.1 175 5.9 22
December 15, 2015 0.379 315 1,188 216 815 31.2 118 48.9 154 4.9 18
December 22, 2015 0.467 159 600 54 204 38.5 145 45.6 178 22.3 84
December 29, 2015 0.672
Average 0.468 203 765 121 457 37.1 140 51.0 176 10.2 38
Minimum 0.368 159 600 1 4 31.2 118 45.6 154 4.9 18
Maximum 0.672 315 1188 216 815 45.5 172 57.1 198 22.3 84

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during November and December. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs decreased to from 83.2 gpd to 80.9 gpd. Soda ash daily addition increased from 410 lbs. per day to 426 lbs. per day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

SBR No. 2 remains out of service as a treatment unit. Minor repairs will be scheduled as weather conditions permit.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 6

[Logo: Big Fish Environmental Services Inc.]

Solids Dewatering and Disposal: December 2015

Sludge Dewatering Summary
Gallons of sludge dewatered 323,417
Number of dumpsters 5

*twenty two (22) days of centrifuge operation

Flow data:

Flow Meter Location December 2015 Daily Maximum Flow, gpd
Total Volume for Month, MG Average Daily Flow, gpd
Influent Wastewater to Screening Building* 14.158 456,704 671,510
Influent Wastewater to SBRs 14.140 456,121 616,448
Internal Recycle 0.342 11,033 71,194
Treated Effluent to Disc Filters 13.642 440,074 622,912
Final Effluent Discharge 10.952 353,290 514,000
Applebrook Golf Course No Discharge No Discharge No Discharge

Chemical Usage:

Chemical December 2015
Daily Average Total Monthly
Soda Ash 426 4,250
Aluminum Sulfate solution 80.9 2,509
Polymer (centrifuge) 0.84 18.48

*twenty two (22) days of centrifuge operation

During December, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of December was 9.95 feet and the level at the end of the month was 15.6 feet. The average pH concentration was 6.60 S.U. and average total alkalinity concentration was 141 mg/L. Zero gallons of supernatant were decanted during the month. 250 pounds of soda ash were added.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 6

[Logo: Big Fish Environmental Services Inc.]

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 7.46 feet and the level at the end was 4.36. The average pH concentration was 6.07 S.U. and average total alkalinity concentration was 102 mg/L. Zero pounds of soda ash were added. Zero gallons of supernatant were decanted.

Significant Storm/Hydraulic Loading Events

During December, there were two (2) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24 hour period. These events occurred on December 1st and 19th resulting in 0.69 and 1.09 inches of rainfall, respectively. Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001.

Minor Repairs and Preventative Maintenance

Replace UV lamps on Bank no. 1, module 2, lamps 2, 6 module 3 lamp 2, 6 module 4, and lamp 3, 7.

Replace UV lamps on Bank no. 2, module 2, lamp 1, 5, module 4, lamp 2, 6 and 3, 7 module 5 lamp 1,4.

Troubleshoot disc filter number 2, valve number 3.

Rewire limit switch on disc filter number 3 valve number 3.

Clean chemical injector located on the static mixer which feeds alum to the disc filters. Chemical injector was clogged with chemical build up.

Clean chemical injector pump which supply’s alum to the disc filters.

Replaced the LDO caps for SBR 1, 3 and 4 LDO probes. Calibrated LDO sensors.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 6

Draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
December 14, 2015

The East Goshen Township Municipal Authority held their regular public meeting on Monday, December 14, 2015 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Yahraes, Dana Pizarro and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Mike Ellis (Pennoni), Carmen Battavio (Township Supervisor) and Jessica Wiesak (Attorney).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Kevin asked if anyone would be recording the meeting and there was no response.

CHAIRMAN’S/MEMBERS REPORTS

  1. Jack reported that he and Mark Miller went to do a visual inspection of the West Goshen Sewer Treatment Plant. A representative of HRG took them through the plant.
  2. Ed attended the West Goshen Sewer Authority meeting on December 2, 2015. He provided a handout and gave the following report: A new board member, Ted Murphy, a West Chester attorney, was introduce.; Goose Creek Stream was discussed. The final report was submitted to EPA on 10/30/15. EPA must review the report and reconsider the Goose Creek designation as nutrient impaired. WGSA is hoping for a 0.8 phosphorus level in the effluent.; The new methane gas burner is having problems possibly because of an old booster pump.; The board approved a requisition for $6,687 to install new aluminum stairs on the new boiler.; An engineering firm did a structural review of the STP. In general things are in good shape; however, the primary clarifier #3 tank wall may need work and the operations building needs a new roof.; The secondary digester needs a new cover. The proposal for a steel cover is $208,870. Installation would be an additional cost. STP staff is considering a Dystor-fabric cover but don’t have a cost yet.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 12-14-15 draft.doc

1

  1. The STP staff is considering a replacement for the system centrifuges using volute presses. Two options are being considered: 2 units with a capacity of 53 gpm at 2% solids budget $700,000 or 1 unit with additional drum at 105 gpm budget $465,000.
  2. Development and maintenance issues were discussed.
  1. Jack reported that Fran is in hospice at Barclay Friends. He has been a member of the Authority for 38 years.

Sewer Reports

  1. Director of Public Works, Mark Miller’s written report: Meters: We checked all meters once a week, no problems to report Average flow – 820,362 November Precipitation – 1.97 C.C. Collection: We checked all pumping stations on a daily basis with no problems to report. We will be pulling pumps this month as part of our routine maintenance. We replaced the manhole castings on Amstel Way; they were the old style lids. We will be replacing several others in the neighborhood. R.C. Collection: All pump stations were visited on a routine basis with no problems to report. Building maintenance was performed in house. I was asked to take a tour of the West Goshen plant last week. I asked Jack Yahraes if he wanted to take a field trip. We toured the plant with David Woodward and their new Engineer. R.C. Plant: Was visited on a routine basis with no problems to report. Alarms: We responded to 2 alarms for November. PA One Calls: We received 31 PA One calls for November.
  2. Pennoni Engineer’s Report Mike Ellis provided the following report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP): We met with the PW Department to determine the desired content for a new Standard Operating Procedures/O&M Manual for the RCSTP and the Township’s pump stations. A proposal to prepare the Manual was submitted. Reservoir Rd Pump Station: Soft dig test pits at the proposed petroleum products pipeline crossings were performed on November 13, 2015. We observed and documented the pipeline locations and depths. Design plans were updated and resubmitted to the three utility companies for approval of the proposed crossings. Williams-Transco has approved the plans, and we are awaiting responses from Sunoco and PPL-IEC. Aqua Water provided a “will serve” letter for a water service to the pump station. Design plans are 99% complete subject to addressing limited comments from Public Works. We are awaiting comments from the Township Codes Department also. Application packages were submitted on November 19, 2015 to PADEP for the Ridley Creek GP-5 “Utility Line Stream Crossings” and GP-8 “Temporary Road Crossings (across steams)” permits and for the Chester Creek Small Projects Joint Permit for the pump station site and Chester Creek utility crossing.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 12-14-15 draft.doc

2

The application package for an Individual NPDES Permit for Stormwater Discharges Associates with Construction Activities was submitted to the Chester County Conservation District on December 7, 2015.
We anticipate submitting the PennDOT Highway Occupancy Permit application for force main construction along and across E. Strasburg Road and Rt. 352, including detour route plans for road closures, by December 15, 2015.
The tentative schedule follows:

Submit PADEP GP and JP Permit application November 19, 2015
Submit NPDES permit application December 7, 2015
Submit PennDOT HOP Application for force main December 15, 2015
Submit PADEP WQM Part II Permit application December 21, 2015
PennDOT Permit issuance January 2016
PADEP & CCD Permit issuances March-April 2016

Semi-Annual I&I Reports
The PW Department plans to download portable meter data and forward to us by December 14, 2015. We intend to analyze data and prepare a semi-annual I&I report by the end of December.

New Connections
We reviewed a couple of iterations of a grinder pump plan submission for a proposed new house on a subdivided parcel at 930 N. Chester Road.

3. Big Fish Environmental Services – Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during October 2015. Discharge to Applebrook continued during October. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment.
During November there was 1 storm event resulting in daily precipitation amount equal to or greater than 0.5 inches measured during a 24 hour period. This event occurred on November 19th resulting in 1.06 inches of rainfall. Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfalls 001 and 002.
No unscheduled minor repairs or equipment failures were experienced during November.
Scheduled repairs during the month included the following:
November 19- replaced failed UV lamps and installed a new polymer tote.
November 23- flushed the aluminum sulfate chemical lines.

Approval of Minutes

Jack moved to accept the minutes of November 9, 2015. Dana seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 12-14-15 draft.doc

3

Approval of Invoices

  1. Ed moved to approve payment of the following Pennoni invoices: a. Pennoni #665054 $ 172.50 b. Pennoni #665055 $ 86.25 c. Pennoni #665360 $ 6,690.75 Dana seconded the motion. The motion passed unanimously. Mike reviewed the status of the budgets for these payments.
  2. Jack moved to approve payment of the following Gawthrop invoices: a. Gawthrop Invoice #137649 $ 380.00 b. Gawthrop Invoice #139094 $ 780.00 Dana seconded the motion. The motion passed unanimously.
  3. Dana moved to approve payment of the Shainline Excavating invoice #39818 in the amount of $1,900.00. Ed seconded the motion. The motion passed unanimously.

Liaison Reports

Board of Supervisors – Carmen reported that they approved the 2016 budget. They are still in discussion about police staffing.

Financial Reports

Jon Altshul provided the following written report:
In November, the Municipal Authority recorded $113 in revenues (all from interest) and $9,986 in expenses for a negative variance of -$9,873. As of November 30th, the fund balance was $1,488,679 of which $1,426,785 is in the main construction account.

Old Business

  1. Microbeads – Dana heard the government wants to ban them.
  2. Officers for 2016 – Jack mentioned that based on the rotation, the Chairman will be Dana, Vice Chairman Ed, Secretary Jack, Treasurer Kevin and Assistant Sec/Treas Fran.

Goals

Kevin reviewed the goals for 2015.
Goals for 2016 were discussed with the following result:

  1. Newsletter articles – It was decided that the MA will submit articles on an as needed basis since they don’t hold any events.
  2. C, D, E, & F will be included. B (Reservoir Rd Pump Station) should be done so it won’t be included. It was decided to add another goal – Enhance operating procedures.

New Business

  1. Pennoni 2016 Fee Schedule was discussed. They are proposing a 3% increase. After discussion Kevin made a motion to reappoint Pennoni as Authority Engineer for 2016 at the current 2015 rates. Dana seconded the motion. The motion passed. Kevin asked Rick to check on the rate that the Board of Supervisors approved for Pennoni for 2016.
  2. O&M Manual – Pennoni presented a proposal to prepare a new Operations and Maintenance (O&M) Manual for the Ridley Creek Sewage Treatment Plant (RCSTP) and for the pump stations in the conveyance systems. Dana requested that they supply a searchable pdf on

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 12-14-15 draft.doc

4

disk. Dana moved to approve Pennoni’s proposal for a new O&M Manual not to exceed $12,500.00 without written consent. Ed seconded the motion. The motion passed unanimously.

3. Budget Reallocation for Reservoir Road Pump Station – Mike reviewed the original budget and items that were added. They are requesting that funds remaining from several completed activities ($26,915) be reallocated to Phases 11 and 12 and approx. 20 hours for miscellaneous items. Kevin moved to approve the budget reallocation for Reservoir Road Pump Station. Dana seconded the motion. The motion passed unanimously.

4. Big Fish presented a request for a 2% fee increase for 2016. Jack moved to approve the 2% increase for Big Fish. Kevin seconded the motion. The motion passed unanimously.

Capacity Requests

  1. 942 Cornwallis Drive - The subdivision plan proposes to split the 3.5 acre parcel into 2 lots. The existing home is connected to public sewer. The applicant proposes to demolish the existing home and redevelop the lot with 2 new single family homes. The applicant is requesting capacity for one new EDU and to reuse the existing EDU. Ed moved to approve the sewer capacity request with a fee of $7,148.00 and authorize staff to forward the sewer planning module exemption request to DEP. Jack seconded the motion. The motion passed unanimously.

Adjournment

There being no further business, Dana moved to adjourn the meeting. Jack seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm. The next meeting will be held on Monday, January 11, 2016 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 12-14-15 draft.doc

5

[Logo: Pennoni]

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

  • Invoice # : 668503
  • Invoice Date : 12/21/2015
  • Project : EGMA1501
  • Project Name : 2015 General Services

For Services Rendered through: 12/13/2015

Prepared for and attended November MA meeting, issued December Engineer's Report, reviewed December MA meeting agenda, reviewed and provided minor comments on MA's 2016 goals, and attended RCSTP & Pump Station O&M Manual scoping meeting with Public Works Dept.

Phase : **** -- Professional Services

Phase Summary Amount
Labor : 1,063.75
Expense : 0.00
Phase Total : 1,063.75
Amount Due This Invoice $1,063.75
Billing Summary Amount
Fee : 12,000.00
Prior Billings : 9,450.25
Current Billings : 1,063.75
Total Billings : 10,514.00

Phase : **** -- Professional Services — Labor

Class Hours/Units Rate Amount
Authority Engineer 9.25 115.00 1,063.75
Labor Total: 9.25 1,063.75
Totals Category Amount
Total Phase : **** -- Professional Services Labor : $1,063.75
Total Phase : **** -- Professional Services Expense : $0.00
Total Project : EGMA1501 – 2015 General Services Labor : $1,063.75
Total Project : EGMA1501 – 2015 General Services Expense : $0.00

[Handwritten: ok RS 1-8-16]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1501 Invoice Summary
Invoice Date 12/21/2015

Project: EGMA1501
Pennoni Job No.: 2015 General Services
Invoice No: 668503
Invoice Period: 11/9/2015 to 12/13/2015
Initial Authorization: $ 12,000.00 Date: 12/21/2015
Contract Amount: $ 12,000.00
Previously Invoiced: $ 9,450.25
Current Invoice: $ 1,063.75
Invoiced to Date ($): $ 10,514.00
Invoiced to Date (%): 88%
Remaining Budget ($): $ 1,486.00
Remaining Budget (%): 12%

Budget by Phase:

Phase Name: 2015 General Services
Phase Budget: $ 12,000.00
Previously Invoiced: $ 9,450.25
Current Invoice: $ 1,063.75
Invoiced to Date ($): $ 10,514.00
Invoiced to Date (%): 88%
Remaining Budget ($): $ 1,486.00
Remaining Budget (%): 12%

Comments: Prepared for and attended November MA meeting, issued December Engineer's Report, reviewed December MA meeting agenda, reviewed and provided minor comments on MA's 2016 goals, and attended RCSTP & Pump Station O&M Manual scoping meeting with Public Works Dept.

[Logo: Pennoni]

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

  • Invoice # : 668504
  • Invoice Date : 12/21/2015
  • Project : EGMA1504
  • Project Name : Reservoir Rd PS Design & Permitting

For Services Rendered through: 12/13/2015

Phase 11 - Continued coordination for soft dig petroleum pipeline test pits scope and schedule with PPL-IES, Sunoco, Williams-Transco, and Township; performed on-site observation and field measurements during test pits; revised force main plans following test pits; prepared plan submissions to PPL-IES, Sunoco, and Williams-Transco for pipeline crossing approvals; completed Permit Plan submissions (approx 99% complete plans); continued preparation of specifications; cursory review of Permit Plans with Public Works Dept.

Phase 12 - Finalized and submitted NPDES permit application; finalized and submitted PADEP Chapter 105 GP-5 "Utility Line Stream Crossings" & GP-8 "Temporary Road Crossings (across streams)" permit application for Ridley Creek and Chapter 105 GP-5 "Utility Line Stream Crossings" & Small Projects Joint Permit application for Chester Creek and pump station site; continued preparation of PADEP WQM Part II permit application, and prepared PennDOT Highway Occupancy Permit application including detour route plans for force main construction along E. Strasburg Rd and across N. Chester Rd.

Phase : 11 -- Final Design

Phase Summary Amount
Labor : 10,509.25
Expense : 0.00
Phase Total : 10,509.25

Phase : 12 -- Permitting

Phase Summary Amount
Labor : 6,238.50
Expense : 0.00
Phase Total : 6,238.50
Amount Due This Invoice $16,747.75
Billing Summary Amount
Fee : 136,316.25
Prior Billings : 113,144.00
Current Billings : 16,747.75
Total Billings : 129,891.75

[Handwritten: ok RS 1-8-16]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1504 -- Reservoir Rd PS Design & Permitting

Invoice # : 668504

...Continued from previous page

Phase : 11 -- Final Design

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.25 115.00 258.75
Project Engineer 9.75 97.00 945.75
Senior Enviromental Scientist 1.00 90.00 90.00
Associate Engineer 70.25 85.00 5,971.25
Senior Engineering Technician 6.00 85.00 510.00
Engineering Technician II 35.50 77.00 2,733.50
Labor Total: 124.75 10,509.25
Total Phase : 11 -- Final Design Labor : $10,509.25
Expense : $0.00

Phase : 12 -- Permitting

Labor

Class Hours/Units Rate Amount
Authority Engineer 5.25 115.00 603.75
Project Engineer 5.50 97.00 533.50
Staff Engineer 4.00 90.00 360.00
Senior Enviromental Scientist 13.25 90.00 1,192.50
Associate Engineer 41.75 85.00 3,548.75
Labor Total: 69.75 6,238.50
Total Phase : 12 -- Permitting Labor : $6,238.50
Expense : $0.00
Total Project : EGMA1504 – Reservoir Rd PS Design & Permitting Labor : $16,747.75
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.
Page: 2

East Goshen Municipal Authority

EGMA1504 Invoice Summary
Invoice Date 12/21/2015

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 668504
Invoice Period: 11/9/2015 to 12/13/2015
Initial Authorization: $ 167,120.00 Date: 12/21/2015
Contract Amount: $ 167,120.00
Previously Invoiced: $ 135,091.75
Current Invoice: $ 16,747.75
Invoiced to Date ($): $ 151,839.50
Invoiced to Date (%): 91%
Remaining Budget ($): $ 15,280.50
Remaining Budget (%): 9%

Budget by Phase:

Phase Name: Final Design Phase 11
Phase Budget: $ 61,500.00
Previously Invoiced: $ 45,950.00
Current Invoice: $ 10,509.25
Invoiced to Date ($): $ 56,459.25
Invoiced to Date (%): 92%
Remaining Budget ($): $ 5,040.75
Remaining Budget (%): 8%

Comments: Phase 11 - Continued coordination for soft dig petroleum pipeline test pits scope and schedule with PPL-IES, Sunoco, Williams-Transco, and Township; performed on-site observation and field measurements during test pits; revised force main plans following test pits; prepared plan submissions to PPL-IES, Sunoco, and Williams-Transco for pipeline crossing approvals; completed Permit Plan submissions (approx 99% complete plans); continued preparation of specifications; cursory review of Permit Plans with Public Works Dept.

East Goshen Municipal Authority

EGMA1504 Invoice Summary
Invoice Date 12/21/2015

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 668504
Invoice Period: 11/9/2015 to 12/13/2015
Initial Authorization: $ 167,120.00 Date: 12/21/2015
Contract Amount: $ 167,120.00
Previously Invoiced: $ 135,091.75
Current Invoice: $ 16,747.75
Invoiced to Date ($): $ 151,839.50
Invoiced to Date (%): 91%
Remaining Budget ($): $ 15,280.50
Remaining Budget (%): 9%

Budget by Phase:

Phase Name: Permitting Phase 12
Phase Budget: $ 28,610.50
Previously Invoiced: $ 16,151.50
Current Invoice: $ 6,238.50
Invoiced to Date ($): $ 22,390.00
Invoiced to Date (%): 78%
Remaining Budget ($): $ 6,220.50
Remaining Budget (%): 22%

Comments: Phase 12 - Finalized and submitted NPDES permit application; finalized and submitted PADEP Chapter 105 GP-5 "Utility Line Stream Crossings" & GP-8 "Temporary Road Crossings (across streams)" permit application for Ridley Creek and Chapter 105 GP-5 "Utility Line Stream Crossings" & Small Projects Joint Permit application for Chester Creek and pump station site; continued preparation of PADEP WQM Part II permit application, and prepared PennDOT Highway Occupancy Permit application including detour route plans for force main construction along E. Strasburg Rd and across N. Chester R

Reservoir Road Pump Station Design & Permitting

INVOICE SUMMARY

For Services Rendered through: 12/13/2015

Task No. Activity Contract Amount* Invoiced Effort thru 12/13/2015 Remaining Budget ($) Remaining Budget (%) Completed?
1 Concept Design $13,655.75 $13,655.75 - - Yes
2 DEP WQM Pre-App. Meeting $1,300.00 $1,300.00 - - Yes
3 Existing Conditions Survey $22,783.75 $22,783.75 - - Yes
4 Sewer Stakeout in Easements $0.00 $0.00 - - Scope eliminated
5 1636 Bow Tree Dr. Boundary Survey & Easement $4,020.00 $0.00 $4,020.00 100% No
6 Additional Boundary Surveys & Easements $0.00 $0.00 - - Scope eliminated
7 Geotechnical Borings $4,000.00 $4,000.00 - - Yes
8 Install Permanent Survey Benchmarks $0.00 $0.00 - - Scope eliminated
9 Progress Design $29,450.00 $29,450.00 - - Yes
10 Infiltration Testing $1,800.00 $1,800.00 - - Yes
11 Final Design $61,500.00 $56,459.25 $5,040.75 8% No
12 Permitting $28,610.50 $22,390.00 $6,220.50 22% No
TOTAL $167,120.00 $151,838.75 $15,281.25 9%

* After 12/14/2015 approved re-allocation of task budgets.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA December Financial Reports
Date: January 6, 2016

In December, the Municipal Authority recorded $20,112 in revenues (primarily due to a $20,000 transfer from the Sewer Operating Fund) and $47,515 in expenses, for a negative variance of $27,403. Expenses included $8,052 for the quarterly administrative charge-back, $27,409 for the required 28% of the debt service on the 1998 debt and $11,016 for Reservoir Road Pump Station engineering. As of December 31st, the fund balance was $1,461,276, of which $1,415,878 is in the main construction account.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
December 2015

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 1,488,678.91
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 1,600.00 111.59 1,494.45
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 1,600.00 111.59 1,494.45
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00
TOTAL EXPENSES 0.00 0.00 0.00
RCSTP NET RESULT 1,600.00 111.59 1,494.45
OPERATING BUDGET

U:\bmccool\2015\Municipal Authority\2015 - 12 - Municipal Authority Report.xlsx

Page 1 of 3

01/06/2016

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
December 2015

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
REVENUE
INTEREST EARNINGS 07341 1000 15.00 0.74 10.82
C.C. TAPPING FEES 07364 1100 0.00 0.00 27,600.00
R.C.TAPPING FEES 07364 1110 14,296.00 0.00 16,296.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 1,268.64
MISCELLANEOUS REVENUE 07380 1000 0.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 105,105.00 20,000.00 40,000.00
TOTAL REVENUE 119,416.00 20,000.74 85,598.82
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 33,323.00 8,051.60 32,302.60
MISCELLANEOUS EXPENSE 07424 3000 3,000.00 0.00 1,468.05
MUNIC.AUTH.-AUDITING 07424 3110 10,984.00 0.00 8,900.00
ENGINEERING SERVICES 07424 3130 37,300.00 258.75 33,524.50
LEGAL SERVICES 07424 3140 9,000.00 780.00 4,100.00
M.C.-DVRFA-DEBT SERVICE 07471 1000 23,240.00 23,240.00 23,240.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 4,169.00 4,169.00 4,169.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 0.00 0.00 0.00
TOTAL EXPENSES 121,016.00 36,499.35 107,704.15
OPERATING NET RESULT (1,600.00) (16,498.61) (22,105.33)
CAPITAL BUDGET

U:\bmccool\2015\Municipal Authority\2015 - 12 - Municipal Authority Report.xlsx

Page 2 of 3

01/06/2016

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
December 2015

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
REVENUE
DCED GRANT 07354 0400 0.00 0.00 37,162.00
LOAN PROCEEDS-SEWER PROJECT 07393 1001 0.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 0.00 0.00 0.00
TOTAL REVENUE 0.00 0.00 37,162.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 0.00 0.00 0.00
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 0.00 0.00 0.00
MANHOLE COVER REPLACEMENTS 07424.7405 0.00 0.00 0.00
C.C. CAPITAL - COLLECTION 07424.7420 0.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 0.00
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 0.00 0.00 0.00
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 0.00
HERSHEY MILL STATION - ENGINEER 07426 1000 0.00 0.00 0.00
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 0.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 0.00 0.00 0.00
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 0.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 100,000.00 11,015.71 144,451.46
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
TOTAL EXPENSES 100,000.00 11,015.71 144,451.46
CAPITAL NET RESULT (100,000.00) (11,015.71) (107,289.46)
MUNICIPAL AUTHORITY ENDING FUND BALANCE 1,461,276.18

U:\bmccool\2015\Municipal Authority\2015 - 12 - Municipal Authority Report.xlsx

Page 3 of 3

01/06/2016

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 1 : 33 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS0.00
1501JE461561.4402/03/15INTERESTINTEREST EARNED JANUARY 2015
07 FUND
15010.001.44-1.44
1502465261.1703/02/15INTERESTINTEREST EARNED FEBRUARY 2015
07 FUND
15020.001.17-2.61
1503469441.0304/02/15INTERESTINTEREST EARNED MARCH 2015
07 FUND
15030.001.03-3.64
1504474070.6105/04/15INTERESTINTEREST EARNED APRIL 2015
07 FUND
15040.000.61-4.25
1505478250.7506/01/15INTERESTINTEREST EARNED MAY 2015
07 FUND
15050.000.75-5.00
1506483340.6407/02/15INTERESTINTEREST EARNED JUNE 2015
07 FUND
15060.000.64-5.64
1507487820.5608/03/15INTERESTINTEREST EARNED JULY 2015
07 FUND
15070.000.56-6.20
1508492020.6409/01/15INTERESTINTEREST EARNED AUGUST 2015
07 FUND
15080.000.64-6.84
1509496350.8510/02/15INTERESTINTEREST EARNED SEPT.2015
07 FUND

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 1 : 33 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
15090.000.85-7.69
1510501081.2811/03/15INTERESTINTEREST EARNED OCTOBER 2015
07 FUND
15100.001.28-8.97
1511504471.1112/03/15INTERESTINTEREST EARNED NOVEMBER 2015
07 FUND
15110.001.11-10.08
1512508610.7401/04/16INTERESTINTEREST EARNED DECEMBER 2015
07 FUND
15120.000.74-10.82
07341-1000************0.0010.82-10.82
07341-1020 INTEREST EARNED - RCSTP EXPANSION0.00
150146156131.9702/03/15INTERESTINTEREST EARNED JANUARY 2015
07 FUND
15010.00131.97-131.97
150246526119.0803/02/15INTERESTINTEREST EARNED FEBRUARY 2015
07 FUND
15020.00119.08-251.05
150346944131.2704/02/15INTERESTINTEREST EARNED MARCH 2015
07 FUND
15030.00131.27-382.32
150447407125.9005/04/15INTERESTINTEREST EARNED APRIL 2015
07 FUND
15040.00125.90-508.22

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-10201505JE47825128.3706/01/15INTERESTINTEREST EARNED MAY 2015
07 FUND
15050.00128.37-636.59
150648334124.7507/02/15INTERESTINTEREST EARNED JUNE 2015
07 FUND
15060.00124.75-761.34
150748782129.8008/03/15INTERESTINTEREST EARNED JULY 2015
07 FUND
15070.00129.80-891.14
150849202128.9109/01/15INTERESTINTEREST EARNED AUGUST 2015
07 FUND
15080.00128.91-1,020.05
150949635124.2510/02/15INTERESTINTEREST EARNED SEPT.2015
07 FUND
15090.00124.25-1,144.30
151050108126.5311/03/15INTERESTINTEREST EARNED OCTOBER 2015
07 FUND
15100.00126.53-1,270.83
151150447112.0312/03/15INTERESTINTEREST EARNED NOVEMBER 2015
07 FUND
15110.00112.03-1,382.86
151250861111.5901/04/16INTERESTINTEREST EARNED DECEMBER 2015
07 FUND
15120.00111.59-1,494.45
07341-1020************0.001,494.45-1,494.45

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07354-0400 DCED GRANT0.00
1506RE4810737,162.0006/17/1548107 1GRANT - RESERVOIR RD PUMP STA
15060.0037,162.00-37,162.00
07354-0400************0.0037,162.00-37,162.00
07364-1100 C.C. TAPPING FEES0.00
1505477362,000.0005/27/1547736 1TAP IN FEE - 1334 A PARK AVE
15050.002,000.00-2,000.00
1506478532,000.0006/03/1547853 1TAP-IN FEE FOR 1414 BRAMBLE LN
479912,000.0006/10/1547991 1TAP IN FEE FOR 14 RESERVOIR RD
15060.004,000.00-6,000.00
1509CR4945821,600.0009/21/152498069 1GOSHEN MEADOWS INVESTORS L.P.
15090.0021,600.00-27,600.00
07364-1100************0.0027,600.00-27,600.00
07364-1110 R.C.TAPPING FEES0.00
1504472367,148.0004/21/1511237875 1SUNNY RIDGE FARMS LLC
472787,148.0004/23/1511287875 1SUNNY RIDGE FARMS LLC
15040.0014,296.00-14,296.00
1509RE494232,000.0009/18/1549423 1TAP IN FEE FOR 1606 ATLEE DR
15090.002,000.00-16,296.00
07364-1110************0.0016,296.00-16,296.00
07364-1130 CONNECTION FEES - SEWER0.00
1501CR45967423.0001/16/157898648 1GEORGE SMITH & CHRISTINA CONLE
JE45968141.1201/16/15PINE ROCKANNUAL PINE ROCK INSTALLMENT

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 5
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1501141.12423.00-281.88
1502CR46296423.0002/13/152488650 1JACOBS, ROBERT & CHERYL
46479423.0002/26/1523818649 1STOFFLET, MICHAEL
JE46297141.1202/13/15PINE ROCKANNUAL PINE ROCK INSTALLMENT
46480141.1202/26/15PINE ROCKANNUAL PINE ROCK INSTALLMENT
1502282.24846.00-845.64
1505CR47731423.0005/27/1511248651 1PAPPANO, JOSEPH & PATRICIA
15050.00423.00-1,268.64
07364-1130************423.361,692.00-1,268.64
07380-1000 MISCELLANEOUS REVENUE0.00
1501JE45968141.1201/16/15PINE ROCKANNUAL PINE ROCK INSTALLMENT
15010.00141.12-141.12
150246297141.1202/13/15PINE ROCKANNUAL PINE ROCK INSTALLMENT
46480141.1202/26/15PINE ROCKANNUAL PINE ROCK INSTALLMENT
15020.00282.24-423.36
07380-1000************0.00423.36-423.36
07392-0500 TRANSFER FROM SEWER OPERATING0.00
15074856720,000.0007/16/15DEPOSITDEPOSIT $ FROM SEWER ACCT.
15070.0020,000.00-20,000.00
1512RE5054420,000.0012/10/1550544 1XFER YEAR END EXPENSES - MA
15120.0020,000.00-40,000.00
07392-0500************0.0040,000.00-40,000.00

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 6
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-1400 ADMINISTRATIVE WAGES0.00
1503CD468748,292.1003/30/152267425EAST GOSHEN TOWNSHIP - GENERAL
1ST QTR.2015 REIMBURS. FR: MUN.A
15038,292.100.008,292.10
1506482848,292.1006/30/152273425EAST GOSHEN TOWNSHIP - GENERAL
2ND QTR.2015 REIMBURSMT FR:MUN.A
15068,292.100.0016,584.20
1509495298,292.1009/25/152280425EAST GOSHEN TOWNSHIP - GENERAL
3RD QTR 2015 REIMBURSEMENT FR: MA
49551-8,292.1009/25/152280425EAST GOSHEN TOWNSHIP - GENERAL
VOID CK.2280
495527,666.8009/25/152281425EAST GOSHEN TOWNSHIP - GENERAL
3RD QTR.2015 REIMBURSEMENT FR: MA
15097,666.800.0024,251.00
1512506668,051.6012/17/153003425EAST GOSHEN TOWNSHIP - GENERAL
4TH QTR.2015 REIMBURSEMENT FROM
15128,051.600.0032,302.60
07424-1400************32,302.600.0032,302.60
07424-3000 MISCELLANEOUS EXPENSE0.00
150145777950.0001/02/1522602132PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2015 ACTIVE MEMBERSHIP DUES
46110500.0001/29/1522632737COMMONWEALTH OF PA
ANNUAL FEE - NPDES PERMIT -CHAP.
15011,450.000.001,450.00
1506JE4834218.0507/02/15BANK FEEDEPOSIT SLIP ORDER 6/6/15
150618.050.001,468.05
07424-3000************1,468.050.001,468.05

East Goshen Township General Ledger

Report Date 01/06/16 — GL Transaction Details — PAGE 7
MGRP18 run by BRIAN — 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1507 CD 48553 8,900.00 07/16/15 2275 808 MAILLIE FALCONIERO & CO.
EXAM.FINANCIAL STATEMENTS 12/31/
1507 8,900.00 0.00 8,900.00
07424-3110 **** *** ***** 8,900.00 0.00 8,900.00
07424-3130 ENGINEERING SERVICES 0.00
1501 45953 621.50 01/15/15 2261 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 12/7/14 GENERAL
46013 640.00 01/22/15 2262 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 11/9/14 GEN.SERVICE
1501 1,261.50 0.00 1,261.50
1502 46311 5,571.50 02/13/15 2264 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/18/15 2014 CHAP.
1502 5,571.50 0.00 6,833.00
1503 46649 5,685.00 03/12/15 2266 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/15/15 2014 CHAP.
1503 5,685.00 0.00 12,518.00
1504 47119 4,718.75 04/15/15 2269 1052 PENNONI ASSOCIATES INC.
SERV. THRU 3/22/15 2015 GEN.SER
1504 4,718.75 0.00 17,236.75
1505 47583 10,136.50 05/14/15 2270 1052 PENNONI ASSOCIATES INC.
SERV.THRU 4/19/15 2015 GEN.SERV
1505 10,136.50 0.00 27,373.25
1506 47984 1,843.75 06/10/15 2272 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 5/17/15 2015 GEN.SE
1506 1,843.75 0.00 29,217.00

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 8
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-31301507CD485531,921.2507/16/1522761052PENNONI ASSOCIATES INC.
SERV.THRU 6/21/15 2015 SEMI-ANN
15071,921.250.0031,138.25
150848772373.7508/03/1522771052PENNONI ASSOCIATES INC.
SERVICES THRU 7/19/15 2015 GEN.S
1508373.750.0031,512.00
150949338460.0009/11/1522791052PENNONI ASSOCIATES INC.
SERVICE THRU 8/16/15 2015 GEN.SE
1509460.000.0031,972.00
151049748641.2510/13/1522831052PENNONI ASSOCIATES INC.
SERV.THRU 9/20/15 2015 SEMI-ANN
1510641.250.0032,613.25
151150314652.5011/19/1522851052PENNONI ASSOCIATES INC.
SERV.THRU 10/18/15 2015 GEN.SERV
1511652.500.0033,265.75
151250665258.7512/17/1530021052PENNONI ASSOCIATES INC.
SERVICES THRU 11/8/15 2015 GEN.S
1512258.750.0033,524.50
07424-3130************33,524.500.0033,524.50
07424-3140 LEGAL SERVICES0.00
150346649300.0003/12/152265528GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - 1/12/15 GEN.AUT
1503300.000.00300.00
150447119840.0004/15/152268528GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 2/6-2/9/15 GEN.AUT
1504840.000.001,140.00

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 9
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-31401506CD47984860.0006/10/152271528GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 4/7-4/13/15 GEN.AUT
1506860.000.002,000.00
150748553380.0007/16/152274528GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 6/3-6/8/15 GEN.AU
1507380.000.002,380.00
150848918300.0008/12/152278528GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES 7/13/15 GEN.AUTH
1508300.000.002,680.00
151049748260.0010/13/152282528GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES 8/10/15 GEN.AUTH.
1510260.000.002,940.00
151150314380.0011/19/152284528GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 10/12/15 GEN.AUTH.
1511380.000.003,320.00
151250665780.0012/17/153001528GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 11/9-11/20/15 GEN.AU
1512780.000.004,100.00
07424-3140************4,100.000.004,100.00
07428-1000 RESERVOIR PUMP STATION - ENGINEER0.00
150145954137.5001/15/15100291052PENNONI ASSOCIATES INC.
SERV.THRU 12/7/14 RESERV.RD ACT
46014852.5001/22/15100301052PENNONI ASSOCIATES INC.
SERVICE THRU 11/9/14 RESERVOIR R
ACT.537
1501990.000.00990.00

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 10
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07428-10001502CD463125,382.8002/13/15100311052PENNONI ASSOCIATES INC.
SERV.THRU 1/18/15 RESERVOIR RD.P
ACT 537 PLANNING
15025,382.800.006,372.80
15034665010,394.7003/12/15100321052PENNONI ASSOCIATES INC.
SERV. THRU 2/15/15 RESERVOIR RD.
150310,394.700.0016,767.50
15044712018,607.7504/15/15100331052PENNONI ASSOCIATES INC.
SERV. THRU 3/22/15 RESERVOIR RD.
DESIGN & PERMITTING
150418,607.750.0035,375.25
15054758415,825.7505/14/15100341052PENNONI ASSOCIATES INC.
SERV.THRU 4/19/15 RESERVOIR RD.
DESIGN & PERMITTING
150515,825.750.0051,201.00
1506479909,249.5006/10/15100351052PENNONI ASSOCIATES INC.
SERV.THRU 5/17/15 RESERVOIR RD
15069,249.500.0060,450.50
15074855410,841.5007/16/15100361052PENNONI ASSOCIATES INC.
SERV.THRU 6/21/15 - RESERVR.RD P
DESIGN & PERMITTING
150710,841.500.0071,292.00
1508487734,715.2508/03/15100371052PENNONI ASSOCIATES INC.
SERV.THRU 7/19/15 RESERVOIR RD
15084,715.250.0076,007.25
15094934111,709.0009/11/15100381052PENNONI ASSOCIATES INC.
SERVICES THRU 8/16/15 RESERV.RD
150911,709.000.0087,716.25

East Goshen Township General Ledger
Report Date 01/06/16 GL Transaction Details PAGE 11
MGRP18 run by BRIAN 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07428-10001510CD4974934,515.7510/13/15100391052PENNONI ASSOCIATES INC.
SERV. THRU 9/20/815 RESERVR RD
JE501272,250.0011/04/15RECLASSRECLASS EARTHCORE INV.6865
PYMT. 10/22 CK.10040
151036,765.750.00124,482.00
1511CD501901,500.0011/09/1510041263CHESTER COUNTY CONSERVATION DISTRICT
RESERVOIR RD. PERMIT FEE
213.0011/09/15100422299CLEAN WATER FUND -PA DEP - BUREAU WATER
DISTURBED ACREAGE FEE-RESERV.RD
***1,713.000.00 ***
503137,240.7511/19/15100431052PENNONI ASSOCIATES INC.
SERVICES THRU 10/8/15 RESERVR.RD
15118,953.750.00133,435.75
1512504231,500.0012/02/1510044263CHESTER COUNTY CONSERVATION DISTRICT
RESERVOIR RD.PS PROJECT PERMIT
1,900.0012/02/15100451248SHAINLINE EXCAVATING INC
EQUIPMENT RENTAL CONTR.-TEST DUM
***3,400.000.00 ***
50590924.9612/09/151012142FLAGGER FORCE
TRAF. CONTROL TO LOCATE PIPE LIN
FOR FUTURE RESERVOIR RD. P/S
506676,690.7512/17/151021052PENNONI ASSOCIATES INC.
SERV. THRU 11/8/15 RESERVOIR RD
151211,015.710.00144,451.46
07428-1000************144,451.460.00144,451.46
07428-2000 RESERVOIR PUMP STATION CONSTRUCTION0.00
1510499472,250.0010/22/15100402911EARTHCORE SERVICES LLC
TRUCK RIG MOBILIZATION, SKIDSTEE
TRACK RIG, AUGER PROBES
JE501272,250.0011/04/15RECLASSRECLASS EARTHCORE INV.6865
PYMT. 10/22 CK.10040
15102,250.002,250.000.00
07428-2000************2,250.002,250.000.00

East Goshen Township General Ledger

Report Date 01/06/16 — GL Transaction Details — PAGE 12
MGRP18 run by BRIAN — 1 : 34 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07471-1000 M.C.-DVRFA-DEBT SERVICE 0.00
1512 CD 50526 23,240.00 12/09/15 2286 430 EAST GOSHEN TWP - SEWER
28% P&I ON 1998 LOAN - PRINCIPAL
1512 23,240.00 0.00 23,240.00
07471-1000 **** *** ***** 23,240.00 0.00 23,240.00
07472-1000 M.C.-DVRFA-INTEREST PAYMN 0.00
4,169.00 12/09/15 2286 430 EAST GOSHEN TWP - SEWER
28% P&I ON 1998 LOAN - INTEREST
1512 4,169.00 0.00 4,169.00
07472-1000 **** *** ***** 4,169.00 0.00 4,169.00
Grand Total 254,828.97 126,928.63 127,900.34

Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

January 7, 2016

EGMA1502

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Semi-Annual Sewer System Status Report #14
East Goshen Municipal Authority

Dear Mr. Smith:

The following Semi-Annual Sewer System Status Report is a continuation of the reports previously required under the Consent Order & Agreement (CO&A) executed between the Pennsylvania Department of Environmental Protection and the East Goshen Municipal Authority in December 2008. Mandatory reporting to the PaDEP ended on March 31, 2012, so this report will serve as an internal document for the Township. This report continues to describe the progress made towards achieving the milestone events listed in the Corrective Action section of the CO&A including all of the actions taken within the previous six-month period and those which will be taken in the subsequent six-month period. The term “Corrective Action” is replaced with “Action”.

EXECUTIVE SUMMARY

The portable metering investigation continued to be focused in the Ridley Creek Service Area during the current period from April 2015 through mid-December 2015. The meter data indicates inflow continues during very large storm events upstream of Manholes (MH) R-018 and R-213. The data also indicates that at least 55,000 gpd of wet weather infiltration is occurring downstream (south) of Paoli Pike (MH R-238) and downstream (east) of N. Chester Road (MH R-018). We recommend an I&I investigation be performed along the interceptor from Paoli Pike downstream to at least MH R-213 including television inspection of pipes, visual observation of manholes, and smoke testing for inflow sources.

Temporary metering was also performed in the Chester Creek Service Area downstream of large 24/7 commercial uses. Portable meters were installed along Airport Road near Ward Avenue to monitor flows from the Brandywine Business Park, which includes UPS, and in the Goshen Corporate Park near Enterprise Drive. Limited flow was observed at both locations. Additionally, a meter was attempted to be installed on Wilson Drive to monitor additional commercial flows from West Goshen, including QVC, but there was such little flow that the meter would not function properly. These commercial uses are therefore not the source of high continuous base flows in the Chester Creek Interceptor.

In the next six months, the Township should continue portable metering in the Ridley Creek Service Area, calibrate all portable meters, perform an I&I investigation of the remainder of the Ridley Creek interceptor up to at least Paoli Pike as noted above, perform an inflow investigation in the Bow Tree Development, and perform an I&I investigation in the Chester Creek Service Area in sewers that

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 2
Semi-Annual Sewer System Status Report #14

connect to the interceptor between Manhole C-036 and the Reservoir Road permanent meter. One or two portable meters should also be installed along the Chester Creek Interceptor to isolate sources of high base flows in that system. Two new permanent meters should also be installed in the Ridley Creek Collection System.

ACTIONS

1. Action #1: Metering

Flow metering shall take place in the following subbasins for a minimum of four months out of the year, with metering conducted for a minimum of 60 days in the fall and 60 days in the spring.

Refer to the enclosed Figure #1 for a map of previous and future meter locations.

Previous 9 Months:

The current period analyzes meter data from April 2015 through mid-December 2015. Four of the temporary meters continued in locations since August 2014, and two additional meters were installed in August 2015.

Ridley Creek Service Area

  • Blacksmith Shop R-021/R-022 This meter was first installed along the 10-inch Ridley Creek Interceptor sewer in Manhole R-021 which is located by the historic blacksmith shop on the southeast corner of the intersection of N. Chester Road and E. Boot Road. It meters flows in the Ridley Creek Service Area to the west of N. Chester Road including the Hershey’s Mill Pump Station discharge. The portable meter was installed in August 2014. This location had ongoing problems with metering accuracy, possibly due to turbulent flows, so the meter was moved one manhole upstream to Manhole R-022 on the west side of N. Chester Road in the winter of 2014. Flows at Manhole R-022 since August 2015 have been consistent and are considered accurate. The average flow from August 2015 through mid-November 2015 was 96 gpm (138,280 gpd), and the average base flow was 22 gpm (31,210 gpd). For comparison, this manhole was metered in 2010, and the average and base flows were 75 gpm and 25 gpm respectively. The average flow has increased nearly 20 gpm since 2010, while the base flow has remained approximately the same. The peak instantaneous flow for the current period was 306 gpm, which occurred on October 28, 2015 during a 1.5-inch storm. The highest daily flow was approximately 217,000 gpd on October 29, 2015 during an additional 0.75-inches of rainfall following the 1.5-inch storm on the previous day. Inflow is occurring during very large storm events. There were two multi-day rainfall events with over 1-inch precipitation per day in the current period. Base (overnight) flows peaked the day after the 1-inch precipitation at 2-3 times the normal base flow and remained elevated for 3-4 days thereafter. This is likely due to rain-induced infiltration and/or inflow from sump pumps.

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 3
Semi-Annual Sewer System Status Report #14

This meter can be removed.

  • East Boot Road R-018 This portable meter is installed within Manhole R-018, which is located alongside the Ridley Creek on the 10-inch interceptor sewer four manholes downstream of the Blacksmith Shop Manhole R-022 meter. The meter was installed in August 2014. The accuracy of the meter data has been considered questionable since the meter was installed due to extreme variability in meter readings. Additionally, the metered flow from August – December 2015 was less than at the upstream Manhole R-022 meter. The only meter readings in the past 1.5 years that are considered accurate were in October 2014. The average flow and average base flow that month were 75 gpm (107,550 gpd) and 20 gpm (28,550 gpd) respectively. These flows are consistent with metering in this area in 2010. These October 2014 average and base flows are similar to the flows at the upstream Manhole R-022 despite the connection of 40-50 residences in the Bow Tree neighborhood and along Boot Road in between the two manholes. It could be loosely concluded based on this data that there is little to no I&I that enters the sewers between Manholes R-022 and R-018. We recommend this area continue to be metered, but in a different manhole, such as one manhole upstream.
  • East Boot Road R-213 This meter is located in Manhole R-213 alongside the Ridley Creek on the 10-inch interceptor sewer. It meters all flows in the Ridley Creek Service Area originating north of E. Boot Road. The portable meter was installed in August 2014. Recent metering results follow: Period Average Flow gpm (gpd) Average Base Flow gpm (gpd) Nov. 19, 2014 – late March 2015 100 (143,770) 47 (67,030) August 6 – September 29, 2015 73 (105,080) 29 (41,590) September 30 – December 9, 2015 103 (148,210) 47 (67,100) Flows are correlated with precipitation. The period from November 2014 through March 2015 consisted of a lot of wet weather events. August 6 through September 29, 2015 was a dry period with very little precipitation, and the flows are much less during this period. There was a 1.75-inch rainfall event on September 29, 2015, and flows increased the following day. There was an additional 1.75 inches of rainfall within three days thereafter, and flows remained elevated through the end of the metering period on December 9, 2015. This is indicative of rain-induced infiltration in the upstream sewer system. The base flow comprises approximately 46% of the total flow during extended wet weather periods and 40% during dry weather. Since upstream connections are

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 4
Semi-Annual Sewer System Status Report #14

primarily residential, the base flow is likely indicative of upstream infiltration, not high usage during off-peak hours.

During the previous monitoring period, the base flow at the upstream Line Road meter (Manhole R-238) was 11 gpm. The wet weather base flow that enters the sewers between manholes R-238 and R-213 is therefore estimated to be 36 gpm (52,000 gpd).

There is also evidence of inflow during very large storm events as the daily volume increased by approximately 33% (50,000 gpd) on the second day of a 2-day 2.25-inch rain event on October 28-29, 2015. The flows returned to typical levels on October 30, 2015.

We understand that the Township plans to perform smoke testing in the sewers upstream of this location to identify sources of inflow. The portable meter should remain at this location to evaluate the impact of any smoke testing and repairs along the Ridley Creek Interceptor.

  • Tegler R-003 This portable meter is located in Manhole R-003 which is on the 18-inch interceptor, three manholes upstream from the Ridley Creek Sewage Treatment Plant. The only connection between this manhole and the Plant is the Hunt Country neighborhood. The meter was installed in August 2014. The “flow” values reported by the meter in August – December 2015 are incorrect. The reported “flow” values are less than 1 gpm, but they should be 200+ gpm based on the reported levels and velocities and known flow into the RCSTP. The input parameters in the metering software need to be adjusted to report correct “flow” values. Our analysis below is based upon our calculation of “flow” from the reported levels and velocities using Manning’s Equation with assumptions about slope, friction ‘n’ value, and exact pipe diameter. Due to the assumptions, the flow results are not perfectly accurate and vary from the metered flow at the RCSTP permanent influent meter (see discussion on that meter in bullet below). Some conclusions can still be drawn from the meter data. There was a trend of increasing flows during fall 2015 similar to that observed at the RCSTP permanent influent meter. Flows increased significantly after the 1.75-inch rainfall event on September 29, 2015 and remained elevated, similar to that observed at the upstream Manhole R-213 meter. Flows increased even more in November 2015. Base flows ranged from 47% to 62% of average daily flow from August – December 2015. The calculated flow at this meter in October 2015 appears consistent with RCSTP influent flows. The base flow during October was calculated to be 221,000 gpd (153 gpm), which is approximately 60% of the average daily flow. It can be concluded that rain-induced infiltration is a problem in the system upstream of Manhole R-003. We recommend the meter inputs be adjusted and the meter remain in this location to continue to monitor instantaneous flows and capacity in the interceptor.

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 5
Semi-Annual Sewer System Status Report #14

  • RCSTP Permanent Influent Meter The permanent influent meter is located on the Ridley Creek Interceptor in Manhole R-001, the first manhole upstream of the Plant. It meters all flows into the Plant’s influent pump station except Plant recycle flows. Instantaneous flow data is not currently available at this meter. Average daily volumes as reported in Big Fish’s monthly O&M reports for fall 2015 follow: Period Average Flow August 2015 329,292 gpd September 2015 335,485 gpd October 2015 372,085 gpd November 2015 385,989 gpd Average flows increased 11% in October, after the large rain storm on September 29, and increased another 4% in November as the wet weather continued. The total increase in average daily flow was approximately 55,000 gpd between August and November. It would be reasonable to conclude that this is an increase in base flow due to wet weather I&I. Approximately 26,000 gpd of this increase occurred upstream of Manhole R-213, none of it occurred upstream of Manhole R-022, so the remaining 29,000 gpd of the increase is believed to be entering the system downstream of Manholes R-213 and R-022, likely along the Ridley Creek interceptor downstream of Manhole R-018. Installation of a data logger at this permanent meter to record flows at least every hour would allow for more conclusive analysis of I&I in the future.

Chester Creek Service Area

  • Goshen Corporate Park C-535 This portable meter was installed in Manhole C-535 on the 8-inch collection sewer alongside Enterprise Drive in the Goshen Corporate Park. The meter was installed in August 2015, and it monitors all flows from Goshen Corporate Park plus approximately 13 homes on Generals Way on the east side of Boot Road. No flow data is available since velocities were not recorded by the meter. However, flow depth data was recorded. The levels are typical of a commercial area with increases between 8:00 am and 5:00 pm Monday-Friday, and low levels overnight and on weekends. The Public Works Department also observed little to no flow at this manhole on multiple occasions. Although the base flow from this area cannot be quantified, the Goshen Corporate Park is not considered to be the source of significant base flow in the Chester Creek Interceptor. This meter should be removed.
  • Airport Road C-682 This portable meter is installed in Manhole C-682 on the 8-inch sewer line which crosses Airport Road from West Goshen Township near Wright’s Lane. The meter captures flows

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 6
Semi-Annual Sewer System Status Report #14

from the Brandywine Business Park in West Goshen Township, including the UPS facility. It was installed in August 2015.

Meter data is believed to be inaccurate due to very low flow levels. The Public Works Department observed little to no flow at this manhole on multiple occasions. The location is not considered to be a source of notable base flow, if any at all, in the Chester Creek Interceptor.

This meter should be removed.

  • Permanent Chester Creek Service Area Meters Flow data from the ten permanent meters throughout the Chester Creek Service Area were analyzed; six of the meters are in gravity interceptor sewers and four of the meters are on pump station discharge pipes. Instantaneous or hourly meter data is not recorded on these meters; therefore only a rough flow analysis can be performed because inflow peaks and continuous base flows are unknown. Metered flows at the permanent Reservoir Road meter from May – November 2015 are consistent with flows from October 2014 – April 2015, during which significant continuous base flow and inflow during storm events was observed. Significant usage during overnight hours and/or dry weather infiltration is therefore likely continuing in the upstream sewers. As noted above, the commercial uses on Enterprise Drive and in the Brandywine Business Park are not the source of these high overnight flows.

Next 6 Months:

We recommend the following actions for the next six months:

  • Clean and calibrate all portable meters.
  • Remove the QVC (MH C-535), Airport Road (MH C-682), and Blacksmith Shop (MH R-022) portable meters.
  • Continue portable metering at E. Boot Road R-213 and at Tegler R-003.
  • Relocate the E. Boot Road R-018 portable meter one manhole upstream.
  • Install a portable meter downstream of the Bellingham Retirement Community to monitor overnight flows into the Ridley Creek Collection System.
  • Install a portable meter at the location of the proposed Reservoir Pump Station, MH C-032, to continue to monitor hourly flows within the Chester Creek Interceptor.
  • If additional portable meters are available, install one on the Chester Creek Interceptor north of Paoli Pike to monitor flows in the far north portion of the Chester Creek Service Area for continuous base flows.
  • Install two new permanent meters in the Ridley Creek Collection System: one at or near MH R-214 and one at or near MH R-022.

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 7
Semi-Annual Sewer System Status Report #14

  • Evaluate installation of data loggers at permanent meters, specifically at the RCSTP Treatment Plant Influent Meter, to monitor instantaneous flows. This meter is more reliable than the portable meters and would eliminate the need for portable metering at Tegler R-003.

2. Action #2: Televising

Televising and visual inspections should take place on an ongoing, as-needed basis in order to discover areas of excessive I&I and to measure the effectiveness of I&I rehabilitation measures.

Previous 9 Months:

Ridley Creek Service Area

  • Cleaned and televised Wentworth Development, Cornwallis Drive, Colonial Drive, a portion of Paoli Pike, Highland Avenue, Taylor Road, and Vista Farms.

Chester Creek Service Area

  • Cleaned and televised Supplee Valley, Cooper Circle, Reservoir Road, and Waterford Development.

Next 6 Months:

Ridley Creek Service Area

  • Perform an I&I investigation on the Ridley Creek Interceptor along the creek from MH R-213 to MH R-238 (Paoli Pike). The investigation should include smoke testing to locate inflow problems that may not be visually observable and CCTV inspection for infiltration in pipes.
  • We recommend an inflow investigation of sewers upstream of MH R-638 (Ashcom portable meter) focused on manholes and other deficiencies that would allow overland stormwater runoff into the sewers as well as sump pumps, if this was not performed after the May 2015 Semi-Annual Sewer System Status Report.

Chester Creek Service Area

  • We recommend I&I investigations in the tributary sewer systems that connect to the Chester Creek Interceptor between the Reservoir Road portable meter in Manhole C-036 and the Reservoir Road permanent meter.
  • Televise the Mark Drive, Baldwin Drive, Katherine Lane, and Margaret Lane area.

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 8
Semi-Annual Sewer System Status Report #14

3. Action #3: System Hydraulic Characterization

The sanitary sewer collection system tributary to the Ridley Creek Sewage Treatment Plant should be modeled and hydraulically evaluated in order to determine if any physical constraints exist which would not allow for the conveyance of peak wet weather flow.

  • The System Hydraulic Characterization was completed and submitted to DEP in November 2009 as required by the CO&A.

4. Action #4: Rehabilitation

Areas within the sewer systems which have been identified as needing rehabilitation, per the investigations mentioned above, should be rehabilitated.

Previous 9 Months:

Ridley Creek Service Area

  • Replaced several sewer caps.
  • Trap and cleanout repair in Bow Tree.
  • Repaired a broken pipe at the Hunt Country Pump Station.

Chester Creek Service Area

  • Repaired ten sewer lateral cleanout caps.
  • Replaced a broken manhole casting and lid on Greenhill Road.
  • Three point repairs and one excavated repair in Supplee Valley.
  • Replaced relay switch at the Hershey’s Mill Pump Station.
  • Repaired a leak at the Reservoir Road Permanent Meter.
  • Replaced manhole castings on Amstel Way.
  • Cleared lateral blockages.
  • Repaired a broken lateral in Supplee Valley.

Next 6 Months:

  • Continue to conduct rehabilitation of sewers, manholes, and laterals as determined by ongoing investigations, including repair of leaks and replacement of cleanout caps and cleanout pipes that have pulled out of lateral piping.

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 9
Semi-Annual Sewer System Status Report #14

5. Action #5: Post-Rehabilitation Flow Metering

Flow metering should take place in areas that have been rehabilitated in order to document the effectiveness of the rehabilitative work. The metering should take place during both the fall and spring of the year.

Previous 9 Months:

Flows in the Chester Creek Service Area during the current period, from April 2015 through November 2015, have been relatively consistent averaging approximately 1,000,000 gpd. Flows decreased since the leak was repaired at the Reservoir Road permanent meter in July 2015; however, this was also a very dry period. We estimate that base flow decreased by approximately 100,000 gpd after July, which is likely due to both the repair and drier weather.

The average influent flow at the Ridley Creek Sewage Treatment Plant during the current period was approximately 375,000 gpd. Flows have been consistent and have followed rainfall trends. There were no major sewer repairs in the Ridley Creek Service Area during the current period.

Next 6 Months:

  • Data from the portable and permanent meters will continue be reviewed to determine the effectiveness of any repairs in the Chester Creek and Ridley Creek Service Areas.

6. Action #6: House Lateral Investigation Program

The House Lateral Investigation Program ("HLIP") was implemented in conformance with the provisions of the HLIP contained in the February 28, 2008, letter from East Goshen.

Previous 9 Months:

  • Continued to replace cleanout caps at no charge to property owners in the Ridley Creek and Chester Creek Service Areas upon request by property owners or observation by Public Works or Codes Department staff.
  • Continued to repair defective laterals and cleanouts for property owners to ensure that the work is done properly as indicated in Action #4.
  • Re-occupancy inspections were performed at the sale of residences and commercial establishments throughout the Township looking for direct inflow from building sump pumps.

Next 6 Months:

  • Continue to inspect sanitary sewer cleanouts/vents in conjunction with the televising efforts performed under Action #2.
  • Continue Township policy regarding replacement of cleanouts, vent caps, and laterals.
  • Continue re-occupancy inspections at the sale of properties including looking for direct

EGMA1502
Mr. Rick Smith
January 7, 2016
Page 10
Semi-Annual Sewer System Status Report #14

inflow from building sump pumps.

  • Repair of defective laterals and cleanouts by the Township for property owners to ensure that the work is done properly.

7. Action #7: Reporting

Semi-Annual Status Reports should be submitted to the East Goshen Municipal Authority to describe the progress made towards achieving the previous Corrective Action milestone events.

Previous 9 Months:

  • Submitted Semi-Annual Sewer System Status #13 to the Municipal Authority on April 10, 2015.
  • Submitted Semi-Annual Sewer System Status #13 (Updated) to the Municipal Authority on May 19, 2015.
  • Submitted Temporary Metering Analysis update email to the Municipal Authority on October 20, 2015.

Next 6 Months:

  • Prepare and submit the Semi-Annual Sewer System Status #15 to the Municipal Authority by June 30, 2015.

If you should have any questions, please do not hesitate to contact me.

Sincerely,

PENNONI ASSOCIATES INC.

[Signature: Michael J. Ellis]

Michael J. Ellis, P.E.
Authority Engineer

Enclosures: Figure 1

cc: Mark Miller, Public Works Director

W:\PROJECTS\EGMA\EGMA1502-2015 Semi-Annual II Reports\DOCUMENTS\Sewer System Status Rpt 14.docx

FIGURE #1: TOWNSHIP WASTEWATER FACILITIES

EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA

Map of East Goshen Township Wastewater Facilities showing service areas, sanitary sewers, forcemains, sanitary manholes, pump stations, sewage treatment facilities, permanent wastewater meters, and temporary meter locations.

Title Block:

  • Pennoni / PENNONI ASSOCIATES INC. CONSULTING ENGINEERS
  • THIS EXHIBIT IS FOR GRAPHICAL REPRESENTATION ONLY
  • PREPARED FOR EAST GOSHEN TOWNSHIP OF CHESTER COUNTY IN PENNSYLVANIA
  • JANUARY 2016
  • W:\PROJECTS\EGMA\EGMA1502-2015 SEMI-ANNUAL REPORT\DESIGN_PLANS\FIGURE 1 JANUARY 2016 - REVISED.DWG

LEGEND

  • RIDLEY CREEK STP SERVICE AREA
  • WESTTOWN SERVICE AREA
  • HERSHEY'S MILL SERVICE AREA
  • WEST GOSHEN SERVICE AREA
  • EAST WHITELAND SERVICE AREA
  • UN-SEWERED AREAS
  • PUMP STATION
  • SEWAGE TREATMENT FACILITY
  • SANITARY SEWER
  • FORCEMAIN
  • SANITARY MANHOLE
  • PERMANENT WASTEWATER METER
  • TEMPORARY METER LOCATION
  • TOWNSHIP BOUNDARY

GRAPHIC SCALE

2,000 0 1,000 2,000 4,000 ( IN FEET ) 1 inch = 2,000 ft. NORTH

FACILITY AND METER LABELS

  • HUNT COUNTRY PUMP STATION
  • RIDLEY CREEK SEWAGE TREATMENT PLANT
  • RIDLEY CREEK SEWAGE TREATMENT PLANT INFLUENT METER
  • ASHBRIDGE PUMP STATION
  • PROPOSED RESERVOIR ROAD PUMP STATION
  • RESERVOIR ROAD METER
  • WESTTOWN WAY METER
  • ELLIS LANE METER
  • HICKS METER
  • PAOLI PIKE WEST METER
  • GOSHEN CORPORATE PARK MH C-535 PORTABLE METER
  • AIRPORT ROAD MH C-682 PORTABLE METER
  • WILSON DRIVE METER
  • BARKWAY PUMP STATION
  • HERSHEY'S MILL SEWAGE TREATMENT FACILITY
  • HERSHEY'S MILL PUMP STATION
  • DECOMMISSIONED LOCKWOOD CHASE SEWAGE TREATMENT PLANT
  • LINE ROAD MH R-238 PORTABLE METER
  • BLACKSMITH MH R-022 PORTABLE METER
  • AREA OF PROPOSED BELLINGHAM PORTABLE METER
  • E. BOOT RD MH R-213 PORTABLE METER
  • TEGLER MH R-003 PORTABLE METER
  • E. BOOT RD MH R-018 PORTABLE METER

ROAD LABELS

  • DUTTON MILL ROAD
  • HUNTERS CIRCLE
  • EAST STRASBURG ROAD
  • TOWNE DRIVE
  • TOWNSHIP LINE ROAD
  • EAST BOOT ROAD
  • PAOLI PIKE
  • CHANDLER DRIVE
  • GREENHILL ROAD
  • BOOT ROAD
  • AIRPORT ROAD
  • ELLIS LANE
  • RESERVOIR ROAD
  • NORTH CHESTER ROAD
  • MORSTEIN ROAD
  • KING ROAD
  • ENTERPRISE DRIVE

[Logo: The Authorities PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION]

FYI

1000 North Front Street · Suite 401 · Wormleysburg, PA 17043 · 717.737.7655 · Fax 717.737.8431
Email: info@municipalauthorities.org Website: www.municipalauthorities.org

[Stamp: RECEIVED DEC 16 2015 BY: ]

TO: PMAA MEMBER AUTHORITIES
FROM: DOUGLAS E. BILHEIMER, EXECUTIVE DIRECTOR
DATE: DECEMBER 15, 2015
SUBJECT: 2016 ROSTER SHEET

We have enclosed our Roster Sheet for 2016. Please review this form, make changes as outlined below, and return the original corrected copy to the PMAA office as soon as possible.

Please Note: This print-out may contain typographical errors. Please check all information very closely and correct as required. Print corrections legibly, using red or bright ink (no pencil). Strike out, or mark "change box" in each section and provide updated information. PLEASE BE ACCURATE. This information is essential for printing the 2017 Directory to assure correct addresses for mailings, and processing of membership dues.

PAGE 1

Section 1: Company Information:
Reflects company facts; name, address, phone, fax, e-mail/website, county, type of project, type of authority.

Section 2: Revenue Information:
For OPERATING Authorities – Gross Revenues. Revise the gross revenue figure, and indicate the gross revenues for the authority's last completed fiscal year.

For LEASE-BACK Authorities – Annual Lease Rentals – Revise the annual lease rental figure, and indicate the lease rental figure for the authority's last completed fiscal year.

If your authority is a COMBINATION Authority, with both Gross Revenues and Lease-Back Rentals, provide both figures in the appropriate spaces.

Section 3: Authority Participates in these PMAA Programs:
Verify all the PMAA programs your Authority currently participates in.

Section 4: Staff Information:
Revise any changes in the number of employees and board members.

(over)

1

Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401
Wormleysburg, PA 17043
Tel: (717) 737-7655 Fax: (717) 737-8431
Email: Info@MunicipalAuthorities.org

Membership Roster for 2016

Company Information:

[Note: Partially covered by a sticky note handwritten with “Jon” and an arrow pointing down to Annual Lease Rental and Bonded Debt.]

East Goshen
1580 Paoli Pi
West Chester,
Telephone: (6
E-mail: egtadm
Website: www
County: Chest
Type of Projec

Revenue Info

Please Provide ... Fiscal Year
... correct? If not check box and make corrections in the space provided.

Field Value Change Correction
Gross Revenu Change: [ ]
Fiscal Year Er Change: [ ]
Annual Lease Rental (If project is a Lease Back) $878,024.36 Change: [X] 884,300
Bonded Debt: $10,662,000.00 Change: [X] 10,177,000

The Authority Participates in these PMAA Programs:

Is this correct? If not, check box and make corrections in the space provided.

Program Status Change
Life Insurance: No Change: [ ]
Hospital Indemnity: No Change: [ ]
Weekly Disablity: No Change: [ ]
Unemployment Compensation: No Change: [ ]

Staff Information:

Is this correct? If not, check box and make corrections in the space provided.

Staff Category Count Change
Number of Full Time Employees: 0 Change: [ ]
Number of Part Time Employees: 0 Change: [ ]
Number of Board Members: 5 Change: [ ]
Number Covered by Collective Bargaining: 0 Change: [ ]

ID: 212 East Goshen Municipal Authority — Thursday, November 05, 2015
Page 1

Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401
Wormleysburg, PA 17043
Tel: (717) 737-7655 Fax: (717) 737-8431
Email: Info@MunicipalAuthorities.org

Membership Roster for 2016

Is this information correct? If not, check box and make corrections or any additions on blank space provided after this section:

  • Change: [ ] Manager: Louis F. Smith, Jr. - 1580 Paoli Pike, West Chester, PA 19380
  • Change: [ ] Director or Public Works: Mark S. Miller - 1580 Paoli Pike, West Chester, PA 19380
  • Change: [ ] Solicitor: Gawthrop Greenwood, PC/ Patrick McKenna, Esq. - 17 East Gay Street, Suite 100, PO Box 562, West Chester, PA 19381-0562 Ph: (610) 696-8225
  • Change: [ ] Auditor: Maillie LLP/ - C/O East Goshen Municipal Authority, 1580 Paoli Pike, West Chester, PA 19380 Ph: (610) 696-4353
  • Change: [ ] Construct Engineer: Pennoni Associates Inc./ Michael Ellis - 121 Contental Drive, Suite 207, Newark, DE 19713 Ph: (302) 655-4451
  • Change: [ ] Chair: Kevin Cummings - 1606 Williams Way, West Chester, PA 19380
  • Change: [ ] Vice Chair: Dana Pizarro - 1602 Ivy Lane, West Chester, PA 19380
  • Change: [ ] Treasurer: Francis X. Beck, Jr. - 1225 Foxglove Lane, West Chester, PA 19380
  • Change: [ ] Asst/Sect Treas: Jack Yahraes - 911 Vista Drive, West Chester, PA 19380
  • Change: [ ] Secretary: Ed McAssey - 1121 Merrifield Drive, West Chester, PA 19380

ID: 212 East Goshen Municipal Authority Page 2 Thursday, November 05, 2015

Pennsylvania Municipal Authorities Association
1000 North Front Street, Suite 401
Wormleysburg, PA 17043
Tel: (717) 737-7655 Fax: (717) 737-8431
Email: Info@MunicipalAuthorities.org

East Goshen Municipal Authority ID: 212

OPTIONAL EMAIL ADDRESSES FOR BOARD MEMBERS and ASSOCIATES

To allow more timely contact of our members on time sensitive issues and information.

Manager: Louis F. Smith, Jr. - 1580 Paoli Pike, West Chester, PA 19380
Email Address: ___________________________________________________________

Director or Public Works: Mark S. Miller - 1580 Paoli Pike, West Chester, PA 19380
Email Address: ___________________________________________________________

Solicitor: Gawthrop Greenwood, PC/ Patrick McKenna, Esq. - 17 East Gay Street, Suite 100, PO Box 562, West Chester, PA 19381-0562 Ph: (610) 696-8225
Email Address: ___________________________________________________________

Auditor: Maillie LLP/ - C/O East Goshen Municipal Authority, 1580 Paoli Pike, West Chester, PA 19380 Ph: (610) 696-4353
Email Address: ___________________________________________________________

Construct Engineer: Pennoni Associates Inc./ Michael Ellis - 121 Contental Drive, Suite 207, Newark, DE 19713 Ph: (302) 655-4451
Email Address: ___________________________________________________________

Chair: Kevin Cummings - 1606 Williams Way, West Chester, PA 19380
Email Address: ___________________________________________________________

Vice Chair: Dana Pizarro - 1602 Ivy Lane, West Chester, PA 19380
Email Address: ___________________________________________________________

Treasurer: Francis X. Beck, Jr. - 1225 Foxglove Lane, West Chester, PA 19380
Email Address: ___________________________________________________________

Asst/Sect Treas: Jack Yahraes - 911 Vista Drive, West Chester, PA 19380
Email Address: ___________________________________________________________

Secretary: Ed McAssey - 1121 Merrifield Drive, West Chester, PA 19380
Email Address: ___________________________________________________________

ID: 212 East Goshen Municipal Authority Thursday, November 05, 2015

ADDENDUM: E-MAIL QUESTIONNAIRE - 2015