Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
May 9, 2016
7:00 PM

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE
a. Ask if anyone will be taping the meeting?

2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS

3. SEWER REPORTS

a. Director of Public Works Report
b. Pennoni Engineer’s Report
c. Big Fish Environmental Inc. Report with DMR’s

4. APPROVAL OF MINUTES
a. April 11, 2016

5. APPROVAL OF INVOICES

a. Gawthrop Invoice #144090 $ 540.00
b. Pennoni Invoice #687506 $6,629.75
c. Pennoni Invoice #687507 $ 323.00
d. Pennoni Invoice #687508 $ 782.50
e. Pennoni Invoice #687509 $2,579.25
f. Pennoni Invoice #687510 $ 657.50
g. Pennoni Invoice #682661 $2,996.25

5. LIAISON REPORTS

6. FINANCIAL REPORTS

a. April 2016 Report

7. OLD BUSINESS

8. GOALS

a. Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, February, March

b. Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively “I&I”) Plan to reduce the amount of I&I into the sewer system.

F:\Data\Shared Data\Agendas\Municipal Authority\2016\5-9-16.doc

c. Respond to capacity requests within 45 days. Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. 943 Cornwallis Drive

d. Submit topical articles of interest for the East Goshen newsletter.

e. Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March

9. NEW BUSINESS

a. White Chimneys and Cornwallis Drive Manhole Rehabilitation
b. Pennoni Project Budgets

10. CAPACITY REQUESTS
a. Sewer Availability Letter for Brakman Property 1420 E. Strasburg Road

11. ANY OTHER MATTER

12. CORRESPONDENCE AND REPORTS OF INTEREST

13. PUBLIC COMMENT

14. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2016\5-9-16.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 6, 2016

To: Municipal Authority
From: Mark Miller
Re: April 2016 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 895,493.

Meters: The meters have been read on a daily basis. We had a problem at the Wilson Drive meter when the modem failed.

Chester Creek Pump: The pumping stations were visited on a routine basis with no problems to report.

Hunt Country Pump: Was visited on a daily basis.

C.C. Collection: The pumping stations were visited on a daily basis with no problems to report.

We did make several sewer lateral repairs (10) ranging from missing caps to actual lateral repairs.

While doing a paving inspection at Summit House I found that all their sewer vents had open grate caps throughout the complex. Rick and I spoke to come up with a repair for the complex. All the vent pipes were excavated, mushroom caps were installed and a cast iron valve box was placed over the vent pipe, 26 were repaired.

R.C. Collection: Pump Station was visited on a daily basis. We are still cleaning the wet well due to extensive grease.

The new rail system has arrived as well as the new flutes for the grinder pumps. Once the materials arrive we will have MGK start the work.

R.C. Plant: We pulled the 3rd lift station pump for maintenance.

The pipeliner pump for the Centerfuge was pulled and sent out to Deckman for repairs.

John Laidley installed the new level transducer on the Number 1 sludge tank. A.C.S. has to come in and set up the levels in the program.

Lochwood Plant:

Alarms: We responded to 16 alarms for April.

PA One Calls: We received 46 Pa One calls April.

EGMA 1601

[Logo: Pennoni]

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: May 5, 2016
SUBJECT: Engineer’s Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • The NPDES Permit expires on February 28, 2017. The permit renewal application is due to PADEP by September 1, 2016. We have begun preparation of the application.

Reservoir Road Pump Station

  • We are still awaiting PADEP response for the Chester Creek Small Projects Joint Permit for the pump station site and Chester Creek utility crossing.
  • The PennDOT Highway Occupancy Permit application for force main construction along and across E. Strasburg Road and Rt. 352 was revised and resubmitted to address PennDOT’s comments. PennDOT subsequently issued the permit on April 29, 2016.
  • We are in the process of revising the NPDES Permit application and plans to address comments from the Chester County Conservation District (CCCD). We expect to resubmit to the CCCD the week of May 16-20.
  • The Water Quality Management Permit application was submitted to PADEP on April 13, 2016. PADEP has 120 calendar days to perform their review.
  • A complete bid document will be provided once the three remaining permits are issued.

RCSTP and Pump Stations’ O&M Manual

  • Limited activity since the last report.

White Chimneys and Cornwallis Drive Manhole Lining

  • We attended a field visit with the PW Department to observe an alternative product by Epoxytec to evaluate equivalency with the Spraywall product.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2016\Memo to EGMA Board 2016-05-05.docx

EGMA 1601

  • We attended a pre-proposal field meeting thereafter with Township staff and Abel Recon and revisited the condition and dimensions of approximately half the manholes. Abel Recon submitted a proposal under their Costars contract that we have reviewed and forwarded to the Municipal Authority for consideration.

White Chimneys Manhole Replacement

  • We attended a field meeting with Township staff on April 28 to evaluate alternatives for replacing vs. rehabilitating the Ashbridge Pump Station force main discharge manhole (MH C-226).
  • We performed an existing conditions and topographic field survey thereafter, and we are currently preparing a plan of the proposed manhole replacement for use during construction by the PW Department.

Semi-Annual I&I Reports

  • We have begun analysis of data from four portable meters from March-April 2016. We intend to submit an analysis summary via email by May 13 and follow-up with a formal semi-annual report by June 30, pending receipt of additional meter data.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2016\Memo to EGMA Board 2016-05-05.docx

[Logo: Big Fish Environmental Services Inc.]

Ridley Creek Sewage Treatment Plant

Monthly Operations Report:
March 2016

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during February 2016. Discharge to Applebrook was discontinued during February. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The sludge grinder was observed to periodically become clogged with “rags and debris.” The grinder and sludge pump were disassembled several times during the month to remove “rags” and debris. The grinder will be removed for installation of a head and shear plate assembly. No mechanical or operational issues were observed regarding the centrifuge sludge dewatering equipment.

Treatment Process Operation

During February 2016, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average concentration of 0.23 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the February 2016 eDMR.

Table 1

February 2016 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
February 2, 2016 0.409 2.9 9.9 4 14 7.09 24.18 0.21 0.72 1 0.0000
February 5, 2016 0.559 1 5
February 9, 2016 0.390 2.0 6.5 1 3 3.40 11.06 0.18 0.59 2 0.3010
February 12, 2016 0.491 1 4
February 16, 2016 0.699 2.0 11.7 2 12 3.38 19.70 0.16 0.93 1 0.0000
February 18, 2016 0.413 3 10
February 23, 2016 0.432 2.4 8.6 5 18 3.044 10.97 0.10 0.36 1 0.0000
February 25, 2016 0.577 3 14
Average 0.496 2.3 9.2 3 10 4.229 16.48 0.16 0.65 1 0.0753
Minimum 0.390 2.0 6.5 1 3 3.044 10.97 0.10 0.36 1 0.0000
Maximum 0.699 2.9 11.7 5 18 7.090 24.18 0.21 0.93 2 0.3010

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 6

[Logo: Big Fish Environmental Services Inc.]

Ridley Creek Sewage Treatment Plant

Monthly Operations Report:
March 2016

Discharge to Applebrook, Outfall 002, continued to remain off line during February 2016. Table 2 illustrates the influent composite sample data reported for the February 2016.

Table 2

February 2016 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
February 2, 2016 0.495 272 1,124 196 810 30.1 124 42.2 174 5.7 24
February 9, 2016 0.488 193 797 122 504 23.7 98 36.7 149 3.9 16
February 16, 2016 0.961 179 739 186 768 31.6 131 38.6 309 4.0 17
February 23, 2016 0.543 164 677 346 1,429 25.9 107 31.2 141 3.9 16
Average 0.622 202 834 213 878 27.8 115 37.2 194 4.4 18
Minimum 0.488 164 677 122 504 23.7 98 31.2 141 3.9 16
Maximum 0.961 272 1124 346 1429 31.6 131 42.2 309 5.7 24

Table 3 presents the available Outfall 001 final effluent data for the month of March 2016. During March, the presence of foam conditions on the surface of the SBRs remained consistent with the previous month with foam concentrations ranging from 25% to 60% of the area. This is attributed to decreasing water temperatures supporting conditions for growth of filamentous bacteria. Increasing the F:M ratio and decreasing MLSS concentrations is employed to assist in managing the increase in filamentous growth.

During March, there are no anticipated exceedances of the permitted limitations for Outfall 001. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 6

[Logo: Big Fish Environmental Services Inc.]

Ridley Creek Sewage Treatment Plant

Monthly Operations Report:
March 2016

Table 3

March 2016 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
March 1, 2016 0.403 2.6 8.7 4 13 3.48 11.70 0.24 0.81 1 0.0000
March 3, 2016 0.425 2 7
March 8, 2016 0.398 2.6 8.6 3 10 0.250 0.83 0.18 0.60 1 0.0000
March 10, 2016 0.339 2 6
March 15, 2016 0.384 2.4 7.7 4 13 0.146 0.47 0.20 0.64 1 0.0000
March 17, 2016 0.406 1 3
March 22, 2016 0.341 0.26 0.74
March 24, 2016 0.311
March 29, 2016 0.351 0.27 0.79
March 31, 2016 0.302
Average 0.366 2.5 8.4 3 9 1.292 4.33 0.23 0.71 1 0.0000
Minimum 0.302 2.4 7.7 1 3 0.146 0.47 0.18 0.60 1 0.0000
Maximum 0.425 2.6 8.7 4 13 3.480 11.70 0.27 0.81 1 0.0000

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during March 2016.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 6

[Logo: Big Fish Environmental Services Inc.]

Ridley Creek Sewage Treatment Plant

Monthly Operations Report:
March 2016

Table 4

March 2016 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
March 1, 2016 0.518 104 449 73 315 27.7 120 35.5 153 2.9 13
March 8, 2016 0.512 147 635 168 725 30.9 133 35.9 153 4.3 19
March 15, 2016 0.520 138 596 420 1,813 24.7 107 29.6 128 3.2 14
March 22, 2016 0.461
March 29, 2016 0.446
Average 0.491 130 560 220 951 27.8 120 33.7 145 3.5 15
Minimum 0.446 104 449 73 315 24.7 107 29.6 128 2.9 13
Maximum 0.520 147 635 420 1813 30.9 133 35.9 153 4.3 19

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during February and March. Preparations to place SBR 2 were initiated during late March. The SBR is scheduled to be placed in service during April. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs creased to from 70.3 gpd to 73.0 gpd. Soda ash daily addition increased from 417 lbs./day to 452 lbs./day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

SBR No. 2 remains out of service as a treatment unit. Minor repairs will be scheduled during April. Repairs include:

  • Repair alum piping within SBR
  • Replace two (2) decanter valves
  • Reinstall dissolved oxygen probe

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 6

[Logo: Big Fish Environmental Services Inc.]

Ridley Creek Sewage Treatment Plant

Monthly Operations Report:
March 2016

Solids Dewatering and Disposal: March 2016

Sludge Dewatering Summary
Gallons of sludge dewatered 282,595
Number of dumpsters 5

*Eighteen (18) days of centrifuge operation

Flow data:

Flow Meter Location March 2016
Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building* 15.425 497,572 732,790
Influent Wastewater to SBRs 15.081 486,478 632,384
Internal Recycle 0.604 19,480 256,063
Treated Effluent to Disc Filters 14.884 480,130 636,480
Final Effluent Discharge 11.729 378,355 519,000
Applebrook Golf Course No Discharge No Discharge No Discharge

Chemical Usage:

Chemical March 2016
Daily Average Total Monthly
Soda Ash 452 13,100
Aluminum Sulfate solution 73.0 2,263
Polymer (centrifuge) 0.84 19.32

*twenty three (23) days of centrifuge operation

During March, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level transducer is out of service. The level transducer is scheduled for replacement during April. The level transmitter will be changed from pressure level sensor to an ultra-sonic level sensor. The average total solids concentration was 0.82%. The average pH was 5.76 S.U. with an average total alkalinity of 50 mg/L. Zero gallons of supernatant were decanted during the month. 500 pounds of soda ash were added.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 6

[Logo: Big Fish Environmental Services Inc.]

Ridley Creek Sewage Treatment Plant

Monthly Operations Report:
March 2016

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 9.88 feet and the level at the end was 9.30. The average total solids concentration was 0.94%. The average pH was 6.86 S.U. with an average total alkalinity of 155 mg/L. Zero pounds of soda ash were added. Zero gallons of supernatant were decanted.

PA DEP

No activity

Significant Storm/Hydraulic Loading Events

During March, there were three (3) storm events resulting in a daily precipitation amount equal to or greater than 0.4 inches measured during a 24 hour period. A total of 2.45 inches of rainfall were measured during the month. These events occurred on the following dates:

  • March 13 th : 0.79 inches
  • March 14 th : 0.78 inches
  • March 27 th : 0.42 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001.

Minor Repairs and Preventative Maintenance

March 16, 2016: Repaired the back wash pump for disc filter number 1. Replaced the coupling for the motor and pump assembly.
March 21, 2016: Disassembled the sludge grinder for the sludge pump for the centrifuge. Removed “rags” and debris.
March 23, 2016: Disassembled the sludge grinder for the sludge pump for the centrifuge. Removed “rags” and debris.
March 28, 2016: Transferred the contents of SBR 2 to SHT 2.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 6

Draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 11, 2016

The East Goshen Township Municipal Authority held their regular public meeting on Monday, April 11, 2016 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Dana Pizarro, Jack Yahraes, Ed McAssey, Kevin Cummings and Phil Mayer. Also in attendance were: Rick Smith (Township Manager), Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Patrick McKenna (Attorney) and Walter Wujcik (Conservancy Board).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
There was a moment of silence to remember the troops and all veterans.
Dana asked if anyone would be recording the meeting. There was no response.

CHAIRMAN’S/MEMBERS REPORTS

1. Ed and Phil attended the West Goshen Sewer Authority meeting. There were 40 people at the meeting. When they upgraded in 2008 and had problems, they wouldn’t spend the money for repairs. Now the engineer estimates they will need $13 million over the next 10 years for repairs.

Sewer Reports

1. Director of Public Works, Mark Miller presented the following report for March:

Monthly Flows: The average daily flow to West Goshen was 872,000 gallons per day.

Meters: The meters were read on a daily basis. The portable meters have been installed at various locations in the Township.

Chester Creek Pump: The pumping stations were visited on a routine basis with no problems to report.

Hunt Country Pump: It was visited on a daily basis. I ordered the equipment for the wet well. I have been working with MGK Inc. on scheduling the wet well work.

C.C. Collection: We were notified of a lateral backup at 1517 Brian Drive. We found the trap stack full. The crew plunged the lateral and cleared the blockage. We televised the lateral but we were not able to get to the main. It was decided that we excavate the lateral and install a cleanout. We had another lateral clog on Christine Lane when a tree fell and crushed the cleanout stand pipe. We were able to get the line open. The

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 4-11-16 draft.doc

1

homeowner will have to get a plumber to install a new trap and cleanout. We televised the “A” portion on Eastwick Circle.

R.C. Collection – We completed the repairs on the collection system.

R.C. Plant: We finished the re-piping of the utility water pit and installed the rebuilt pump. Scott sent me a list of items that needed repairs and parts.

Lochwood Plant: The monitoring wells have been sealed as required by the County. The only items we have left are the removal of some spray heads and fencing.

Alarms: We responded to 16 alarms for March.

PA One Calls: We received 55 PA One calls for March.

2. Pennoni Engineer’s Report

Mike Ellis provided the following report:

Invoices: Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP):
The NPDES Permit expires on February 28, 2017. The permit renewal application is due to PADEP by Setpember 1, 2016. We anticipate initiating work on the renewal application within the next two weeks.

Reservoir Rd Pump Station:
PADEP previously issued the permits for the Ridley Creek GP-5 “Utility Line Stream Crossings” and GP-8 “Temporary Road Crossings (across streams)” and for the pump station site floodplain filling works.

We are still awaiting PADEP response for the Chester Creek Small Projects Joint Permit for the pump station site and Chester Creek utility crossing.

PPL-IES approved the petroleum pipeline crossing. Approvals were already received from Williams-Transco and Sunoco. All pipeline companies have now approved the proposed crossings.

The PennDOT Highway Occupancy Permit application for force main construction along and across E. Strasburg Road and Rt. 352 was resubmitted to address comments from our field meeting with PennDOT representatives. PennDOT reviewed and provided additional comments that we are in the process of addressing.

The NPDES Permit application was submitted to the Chester Co. Conservation District on March 21, 2016 and came back with several pages of comments.

The Water Quality Management Permit application will be submitted to PADEP on April 8, 2016.

The tentative schedule follows:

Submitted PADEP GP and JP Permit application November 19, 2015
Submitted NPDES Permit Application March 21, 2016
Submit PADEP WQM Permit application April 8, 2016
Resubmit PennDOT HOP application by April15, 2016
PennDOT Permit issuance Late April 2016
PADEP & CCCD Permit issuances June-July 2016

RCSTP and Pump Stations’ O&M Plan
We continued preparation of the Sewer System Operations and Maintenance (O&M) Manual including reformatting to address comments from the Township Manager.

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 4-11-16 draft.doc

2

Sanitary Sewer Manhole Rehabilitation
We have evaluated alternative manhole interior rehabilitation products and set up a field visit with the PW Department to observe an alternative product for equivalency. Should have results at the next meeting.

Chapter 94 Reports
The Ridley Creek STP and West Goshen Service Area Reports were completed and submitted to PADEP on March 30, 2016. The Westtown Service Area Report was completed and submitted to Westtown Township on March 25, 2016.
Note: Last year the average flow to West Goshen was 721,000 gpd. This has been dropping each year with the diversions that are being done. Ridley’s flow was 408,000 gpd and BOD was 606,00 lbs/day.

3. Big Fish Environmental Services – Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during February 2016. Discharge to Applebrook was discontinued during February. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The sludge grinder was observed to periodically become clogged with “rags and debris.” The grinder and sludge pump were disassembled several times during the month to remove “rags” and debris. The grinder will be removed for installation of a head and shear plate assembly. No mechanical or operational issues were observed regarding the centrifuge sludge dewatering equipment.

During March, there were three storm events resulting in a daily precipitation amount equal to or greater than 0.4 inches measured during a 24 hour period. A total of 2.45 inches of rainfall were measured during the month. These events occurred on the following dates:

  • March 13 - 0.79 inches
  • March 14 - 0.78 inches
  • March 27 - 0.42 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001.

Minor repairs and preventative maintenance were:

  • March 16, 2016: Repaired the back wash pump for disc filter #1. Replaced the coupling for the motor and pump assembly.
  • March 21, 2016: Disassembled the sludge grinder for the sludge pump for the centrifuge. Removed “rags” and debris.
  • March 23, 2016: Disassembled the sludge grinder for the sludge pump for the centrifuge. Removed “rags” and debris.
  • March 28, 2016: Transferred the contents of SBR 2 o SHT 2.

Mike reported that they looked into bypass pumps – for the Plant at 3 mgd max an 8” pump at $70,000 plus a trailer and accessories; for 2 mgd a 6” pump at $54,400 could be used. Rick is concerned that emergencies are usually weather related, which makes it difficult to rent a pump because of the demand in that situation. Mike feels at least a 6” pump is needed for the plant. Dana verified that the pump stations have pumps and generators. Mark mentioned that he just rented a pump for a month at $2,000 but it was not silent. Kevin suggested that they get pricing on used pumps too.

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 4-11-16 draft.doc

3

Approval of Minutes

Jack moved to accept the minutes of March 14, 2016. Phil seconded the motion. The motion passed unanimously.

Approval of Invoices

  1. Ed moved to approve payment of the William Wood Co invoice for $1,000.00 which has been paid. Jack seconded the motion. The motion passed unanimously.
  2. Jack moved to approve payment of the Gawthrop Invoice #142725 for $1,523.50. Kevin seconded the motion. The motion passed unanimously.
  3. Kevin moved to approve payment of the following Pennoni invoices: Pennoni #682656      $ 1,576.25; Pennoni #682703      $ 2,396.50; Pennoni #682658      $ 1,955.75; Pennoni #682659      $ 778.00; Pennoni #682660      $ 761.75; Pennoni #682661      $ 2,996.25 Jack seconded the motion. There was discussion of status of project budgets. The motion passed unanimously.

Liaison Reports

Conservancy Board – Walter reported that Keep East Goshen Beautiful Day had to be cancelled twice because of bad weather. It is held in April because of the ticks and poisonous plants that come out later. Ten trees were received from Potters and 8 were planted along E. Boot Road and 2 were planted in the park by Public Works Dept.

Financial Reports

Jon Altshul provided the following written report:
In March, the Municipal Authority recorded $25,110 in revenues (primarily from a $25,000 transfer from the Sewer Operating Fund) and $22,038 in expenses, (including $7,705 for the quarterly administrative charge-back, $9,875 for general engineering services and $2,935 for Reservoir Road Pump Station engineering) for a positive variance of $3,072. As of March 31st, the fund balance was $1,449,120 of which $1,393,945 is in the main construction account.

Goals

Goals for 2016 were discussed. Articles for the newsletter were discussed.

New Business

  1. Act 537, Exemption 943 Cornwallis Drive Subdivision – Letter dated March 22, 2016 from the DEP confirmed the DEP’s determination that the referenced project is exempt from the requirement to revise the Official Plan for new land development.
  2. Force Main Reservoir Rd Pump Station – Rick sent an offer letter for the Temporary and Permanent Easement to Donald Pusey of $690.00.
  3. Manhole Lining Project – Mike Ellis reported that, due to the addition of Cornwallis Dr., Barkway and Hunt Country manholes to the original White Chimneys scope, this

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 4-11-16 draft.doc

4

will require an increase in the budget to approx.. $7,400.00. Ed moved to approve the increase to $7,400.00. Jack seconded the motion. The motion passed unanimously.

Any Other Matter

Patrick reported that Tredyffrin is selling the Valley Creek Trunk Center. He gave a summary of the situation.

Adjournment

There being no further business, Jack moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:15 pm. The next meeting will be held on Monday, May 9, 2016 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 4-11-16 draft.doc

5

[Logo: Gawthrop Greenwood, PC Attorneys at Law]

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/08/2016
Client No: 6604-001R
Invoice No. 144090

General Authority Services

Fees

Date Staff Description Hours
03/14/2016 JKW Review agenda in advance of meeting; Attend Municipal Authority meeting. 2.00
03/18/2016 PMM Email from R Smith regarding Pusey easement. 0.20
JKW Review email from R Smith regarding easement appraisal; reply; draft Memorandum regarding Municipal Authority meeting. 0.50
For Current Services Rendered 2.70      540.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Jessica K. Wiesak 2.50 $200.00 $500.00
Patrick M. McKenna 0.20 200.00 40.00
Total Current Charges 540.00
Balance Due $540.00

[Handwritten: THIS INVOICE HAS BEEN PAID RJS]

[Handwritten: OK TO PAY 4-21-16 Rick]

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 687506
Invoice Date : 04/27/2016
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting

For Services Rendered through: 4/17/2016

:::::: Prepare invoice summary P:\Projects\EGMA\Invoicing. Send finals to Mike Ellis he will forward to client

Finalized and submitted NPDES and Water Quality Management (WQM) Part 2 permit applications, including plans, to CCCD and PADEP respectively. Received comments from CCCD on NPDES application thereafter and initiated plan and application revisions to address comments. Received mark-ups from PennDOT on HOP Detour plans, and prepared HOP plan revisions.

Phase : 11 -- Final Design

Total Phase : 11 -- Final Design Labor : 3,630.75
Expense : 0.00
Phase Total : 3,630.75

Phase : 12 -- Permitting

Total Phase : 12 -- Permitting Labor : 2,999.00
Expense : 0.00
Phase Total : 2,999.00
Amount Due This Invoice $6,629.75
Fee : $136,316.25
Prior Billings : $129,508.00
Current Billings : $ 6,629.75
Total Billings : $136,137.75

[Handwritten: ok RS 5-5-16]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1504 -- Reservoir Rd PS Design & Permitting
Invoice # : 000

...Continued from previous page

Phase : 11 -- Final Design

Labor

Class Hours/Units Rate Amount
Authority Engineer 9.50 115.00 1,092.50
Project Engineer 2.75 97.00 266.75
Graduate Engineer 24.00 77.00 1,848.00
Engineering Technician II 4.00 77.00 308.00
Engineering Technician II 1.50 77.00 115.50
Labor Total: 41.75 3,630.75
Total Phase : 11 -- Final Design Labor : $3,630.75
Expense : $0.00

Phase : 12 -- Permitting

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.75 115.00 316.25
Project Engineer 5.00 97.00 485.00
Staff Engineer 0.25 90.00 22.50
Graduate Engineer 28.25 77.00 2,175.25
Labor Total: 36.25 2,999.00
Total Phase : 12 -- Permitting Labor : $2,999.00
Expense : $0.00
Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting Labor : $6,629.75
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.      Page: 2

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 4/27/2016

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 687506
Invoice Period: 3/21/2016 to 4/17/20116
Initial Authorization: $ 167,120.00 Date: 4/27/2016
Contract Amount: $ 167,120.00
Previously Invoiced: $ 160,312.50
Current Invoice: $ 6,629.75
Invoiced to Date ($): $ 166,942.25
Invoiced to Date (%): 99.89%
Remaining Budget ($): $ 177.75
Remaining Budget (%): 0.11%

Budget by Phase:

Phase Name: Final Design Phase 11
Phase Budget: $ 61,500.00
Previously Invoiced: $ 57,711.00
Current Invoice: $ 3,630.75
Invoiced to Date ($): $ 61,341.75
Invoiced to Date (%): 99.74%
Remaining Budget ($): $ 158.25
Remaining Budget (%): 0.26%

Comments: Finalized and submitted NPDES and Water Qualtiy Management (WQM) Part 2 permit applications, including plans to CCCD and PADEP respectively. Received comments from CCCD on NPDES application thereafter and initiated plan and application revisions to address comments. Received mark-ups from PennDOT and HOP Detour plans, and prepared HOP plan revisions.

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 4/27/2016

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 687506
Invoice Period: 3/21/2016 to 4/17/2016
Initial Authorization: $ 167,120.00 Date: 4/27/2016
Contract Amount: $ 167,120.00
Previously Invoiced: $ 160,312.50
Current Invoice: $ 6,629.75
Invoiced to Date ($): $ 166,942.25
Invoiced to Date (%): 99.89%
Remaining Budget ($): $ 177.75
Remaining Budget (%): 0.11%

Budget by Phase:

Phase Name: Permitting Phase 12
Phase Budget: $ 28,610.50
Previously Invoiced: $ 25,591.25
Current Invoice: $ 2,999.00
Invoiced to Date ($): $ 28,590.25
Invoiced to Date (%): 99.93%
Remaining Budget ($): $ 20.25
Remaining Budget (%): 0.07%

Comments: Finalized and submitted NPDES and Water Qualtiy Management (WQM) Part 2 permit applications, including plans to CCCD and PADEP respectively. Received comments from CCCD on NPDES application thereafter and initiated plan and application revisions to address comments. Received mark-ups from PennDOT and HOP Detour plans, and prepared HOP plan revisions.

Reservoir Road Pump Station Design & Permitting

INVOICE SUMMARY
For Services Rendered through: 4/17/2016

Task No. Activity Contract Amount* Invoiced Effort thru 2/14/2016 Remaining Budget ($) Remaining Budget (%) Completed?
1 Concept Design $13,655.75 $13,655.75 - - Yes
2 DEP WQM Pre-App. Meeting $1,300.00 $1,300.00 - - Yes
3 Existing Conditions Survey $22,783.75 $22,783.75 - - Yes
4 Sewer Stakeout in Easements $0.00 $0.00 - - Scope eliminated
5 1636 Bow Tree Dr. Boundary Survey & Easement $4,020.00 $4,020.00 - - Yes
6 Additional Boundary Surveys & Easements $0.00 $0.00 - - Scope eliminated
7 Geotechnical Borings $4,000.00 $4,000.00 - - Yes
8 Install Permanent Survey Benchmarks $0.00 $0.00 - - Scope eliminated
9 Progress Design $29,450.00 $29,450.00 - - Yes
10 Infiltration Testing $1,800.00 $1,800.00 - - Yes
11 Final Design $61,500.00 $61,341.75 $158.25 <1% No
12 Permitting $28,610.50 $28,590.25 $20.25 <1% No
TOTAL $167,120.00 $166,941.50 $178.50 <1%

*After 12/14/2015 approved re-allocation of task budgets.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 687507
Invoice Date : 04/27/2016
Project : EGMA1505
Project Name : RCSTP and Pump Station O&M Manual

For Services Rendered through: 4/17/2016

Reformatted draft O&M Manual to address Township's initial comments.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 323.00
Expense : 0.00
Phase Total : 323.00
Amount Due This Invoice $323.00
Fee : 12,500.00
Prior Billings : 4,549.75
Current Billings : 323.00
Total Billings : 4,872.75

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Project Engineer 0.75 97.00 72.75
Graduate Engineer 3.25 77.00 250.25
Labor Total: 4.00 323.00
Total Phase : **** -- Professional Services Labor : $323.00
Expense : $0.00
Total Project : EGMA1505 -- RCSTP and Pump Station O&M Manual Labor : $323.00
Expense : $0.00

[Handwritten: ok RS 5-5-16]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1505 Invoice Summary
Invoice Date 04/27/2016

Project: EGMA1505
Pennoni Job No.: RCSTP & Pump Station O&M Manual
Invoice No: 687507
Invoice Period: 3/21/2016 to 4/17/2016
Initial Authorization: $ 12,500.00 Date: 4/27/2016
Contract Amount: $ 12,500.00
Previously Invoiced: $ 4,549.75
Current Invoice: $ 323.00
Invoiced to Date ($): $ 4,872.75
Invoiced to Date (%): 39%
Remaining Budget ($): $ 7,627.25
Remaining Budget (%): 61%

Budget by Phase:

Phase Name: RCSTP & Pump Station O&M Manual
Phase Budget: $ 12,500.00
Previously Invoiced: $ 4,549.75
Current Invoice: $ 323.00
Invoiced to Date ($): $ 4,872.75
Invoiced to Date (%): 39%
Remaining Budget ($): $ 7,627.25
Remaining Budget (%): 61%

Comments: Reformatted draft O&M Manual to address Township's initial comments.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 687508
Invoice Date : 04/27/2016
Project : EGMA1601
Project Name : 2016 General Services

For Services Rendered through: 4/17/2016

Analysis and vendor coordination for sizing and cost of portable bypass pumps for RCSTP and pump stations; provided grease protection info to PW Director for consideration at Hunt Country PS; prepared April Engineer's Report; and attended April MA meeting.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 782.50
Expense : 0.00
Phase Total : 782.50
Amount Due This Invoice $782.50
Fee : 12,300.00
Prior Billings : 2,422.00
Current Billings : 782.50
Total Billings : 3,204.50

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 5.75 115.00 661.25
Project Engineer 1.25 97.00 121.25
Labor Total: 7.00 782.50
Total Phase : **** -- Professional Services Labor : $782.50
Expense : $0.00
Total Project : EGMA1601 -- 2016 General Services Labor : $782.50
Expense : $0.00

[Handwritten: ok RS 5-5-16]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1601 Invoice Summary
Invoice Date 04/27/2016

Project: EGMA1601
Pennoni Job No.: 2016 General Services
Invoice No: 687508
Invoice Period: 3/21/2016 to 4/17/2016
Initial Authorization: $ 12,300.00 Date: 4/27/2016
Contract Amount: $ 12,300.00
Previously Invoiced: $ 2,422.00
Current Invoice: $ 782.50
Invoiced to Date ($): $ 3,204.50
Invoiced to Date (%): 26%
Remaining Budget ($): $ 9,095.50
Remaining Budget (%): 74%

Budget by Phase:

Phase Name: 2016 General Services
Phase Budget: $ 12,300.00
Previously Invoiced: $ 2,422.00
Current Invoice: $ 782.50
Invoiced to Date ($): $ 3,204.50
Invoiced to Date (%): 26%
Remaining Budget ($): $ 9,095.50
Remaining Budget (%): 74%

Comments: Analysis and vendor coordination for sizing and cost of portable bypass pumps for RCSTP and pump stations; preovided grease protection info to PW Director for sondieration at Hunt Country PS; prepared April Engineer's report; and attnded April MA meeting.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 687509
Invoice Date : 04/27/2016
Project : EGMA1603
Project Name : 2015 Chapter 94 Reports

For Services Rendered through: 4/17/2016

Finalized and submitted RCSTP and West Goshen Chp. 94 reports to PADEP and Westtown Tributary Report to Westtown Twp.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 2,579.25
Expense : 0.00
Phase Total : 2,579.25
Amount Due This Invoice $2,579.25
Fee : 15,000.00
Prior Billings : 4,882.75
Current Billings : 2,579.25
Total Billings : 7,462.00

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 10.50 115.00 1,207.50
Project Engineer 0.25 97.00 24.25
Graduate Engineer 17.50 77.00 1,347.50
Labor Total: 28.25 2,579.25
Total Phase : **** -- Professional Services Labor : $2,579.25
Expense : $0.00
Total Project : EGMA1603 -- 2015 Chapter 94 Reports Labor : $2,579.25
Expense : $0.00

[Handwritten: ok RS 5-5-16]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1603 Invoice Summary
Invoice Date 04/27/2016

Project: EGMA1603
Pennoni Job No.: 2015 Chapter 94 Reports
Invoice No: 687509
Invoice Period: 3/21/2016 to 4/17/2016
Initial Authorization: $ 15,000.00 Date: 4/27/2016
Contract Amount: $ 15,000.00
Previously Invoiced: $ 4,882.75
Current Invoice: $ 2,579.25
Invoiced to Date ($): $ 7,462.00
Invoiced to Date (%): 50%
Remaining Budget ($): $ 7,538.00
Remaining Budget (%): 50%

Budget by Phase:

Phase Name: 2015 Chapter 94 Reports
Phase Budget: $ 15,000.00
Previously Invoiced: $ 4,882.75
Current Invoice: $ 2,579.25
Invoiced to Date ($): $ 7,462.00
Invoiced to Date (%): 50%
Remaining Budget ($): $ 7,538.00
Remaining Budget (%): 50%

Comments: Finalized and submitted RCSTP and West Goshen Chp. 94 reports to PADEP and Westtown Tributary Report to Westtown Twp.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 687510
Invoice Date : 04/27/2016
Project : EGMA1604
Project Name : White Chimneys MH Lining Bid Doc

For Services Rendered through: 4/17/2016

Field visit to Epoxytec-lined example manholes with PW Dept and vendor, and evaluated construction contracting methodology for bidding vs. Costars.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 657.50
Expense : 0.00
Phase Total : 657.50
Amount Due This Invoice $657.50
Fee : 7,400.00
Prior Billings : 4,389.00
Current Billings : 657.50
Total Billings : 5,046.50

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 1.50 115.00 172.50
Project Engineer 5.00 97.00 485.00
Labor Total: 6.50 657.50
Total Phase : **** -- Professional Services Labor : $657.50
Expense : $0.00
Total Project : EGMA1604 -- White Chimneys MH Lining Bid Doc Labor : $657.50
Expense : $0.00

[Handwritten: ok RS 5-5-16]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1601 Invoice Summary
Invoice Date 04/27/2016

Project: EGMA1604
Pennoni Job No.: White Chimneys MH Lining Bid Doc
Invoice No: 687510
Invoice Period: 3/21/2016 to 4/17/2016
Initial Authorization: $ 4,400.00 Date: 4/27/2016
Contract Amount: $ 7,400.00
Previously Invoiced: $ 4,389.00
Current Invoice: $ 657.50
Invoiced to Date ($): $ 5,046.50
Invoiced to Date (%): 68%
Remaining Budget ($): $ 2,353.50
Remaining Budget (%): 32%

Budget by Phase:

Phase Name: White Chimneys MH Lining Bid Doc
Phase Budget: $ 7,400.00
Previously Invoiced: $ 4,389.00
Current Invoice: $ 657.50
Invoiced to Date ($): $ 5,046.50
Invoiced to Date (%): 68%
Remaining Budget ($): $ 2,353.50
Remaining Budget (%): 32%

Comments: Field visit to Epoxytec-lined example manholes with PW Dept and vendor, and evaluated construction contracting methodology for bidding vs. Costars.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA April Financial Reports
Date: May 6, 2016

In April, the Municipal Authority recorded $106 in revenues (interest) and $20,055 in expenses (including $7,500 for auditing expenses, $6,492 for general engineering services, and $5,523 for Reservoir Road Pump Station engineering), for a negative variance of $19,949. As of April 30th, the fund balance was $1,429,231, of which $1,388,525 is in the main construction account.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2016

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 1,449,179.93
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 1,500.00 105.33 428.74
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 1,500.00 105.33 428.74
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L. CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00
TOTAL EXPENSES 0.00 0.00 0.00
RCSTP NET RESULT 1,500.00 105.33 428.74

OPERATING BUDGET

U:\bmccool\2016\Municipal Authority\2016 - 04 - Municipal Authority Report.xlsx      Page 1 of 3      05/05/2016

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2016

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
REVENUE
INTEREST EARNINGS 07341 1000 10.00 0.62 2.07
C.C. TAPPING FEES 07364 1100 4,000.00 0.00 0.00
R.C.TAPPING FEES 07364 1110 4,000.00 0.00 12,152.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 845.64
MISCELLANEOUS REVENUE 07380 1000 0.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 93,832.00 0.00 25,000.00
TOTAL REVENUE 101,842.00 0.62 38,423.07
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 0.00 0.00 7,705.49
MISCELLANEOUS EXPENSE 07424 3000 3,000.00 0.00 1,641.62
MUNIC.AUTH.-AUDITING 07424 3110 9,500.00 7,500.00 7,500.00
ENGINEERING SERVICES 07424 3130 38,500.00 6,491.75 23,335.25
LEGAL SERVICES 07424 3140 9,000.00 540.00 2,943.50
M.C.-DVRFA-DEBT SERVICE 07471 1000 24,920.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 3,172.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 0.00 0.00 0.00
TOTAL EXPENSES 88,092.00 14,531.75 43,125.86
OPERATING NET RESULT 13,750.00 (14,531.13) (4,702.79)

U:\bmccool\2016\Municipal Authority\2016 - 04 - Municipal Authority Report.xlsx
Page 2 of 3
05/05/2016

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
April 2016

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07393 1001 0.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 0.00 0.00 0.00
TOTAL REVENUE 0.00 0.00 0.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 0.00 0.00 0.00
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 0.00 0.00 0.00
MANHOLE COVER REPLACEMENTS 07424.7405 0.00 0.00 0.00
C.C. CAPITAL - COLLECTION 07424.7420 0.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 0.00
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 0.00 0.00 0.00
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 0.00
HERSHEY MILL STATION - ENGINEER 07426 1000 0.00 0.00 0.00
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 0.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 0.00 0.00 0.00
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 0.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 0.00 5,522.75 27,770.75
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
ASBSTOS CONCRETE ENGINEERING 07429 3130 25,000.00 0.00 0.00
DIVERSION PROJ.- LEGAL 07429 3166 0.00 0.00 0.00
TOTAL EXPENSES 25,000.00 5,522.75 27,770.75
CAPITAL NET RESULT (25,000.00) (5,522.75) (27,770.75)
MUNICIPAL AUTHORITY ENDING FUND BALANCE 1,429,231.38

U:\bmccool\2016\Municipal Authority\2016 - 04 - Municipal Authority Report.xlsx
Page 3 of 3
05/05/2016

East Goshen Township General Ledger
Report Date 05/05/16 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 3 : 26 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1601 JE 51240 0.43 02/01/16 INTEREST INTEREST EARNED JANUARY 2016
07 FUND
1601 0.00 0.43 -0.43
1602 51651 0.51 03/01/16 INTEREST INTEREST EARNED FEBRUARY 2016
07 FUND
1602 0.00 0.51 -0.94
1603 52095 0.51 04/04/16 INTEREST INTEREST EARNED MARCH 2016
07 FUND
1603 0.00 0.51 -1.45
1604 52568 0.62 05/03/16 INTEREST INTEREST EARNED APRIL 2016
07 FUND
1604 0.00 0.62 -2.07
07341-1000 **** *** ***** 0.00 2.07 -2.07
07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00
1601 51240 110.59 02/01/16 INTEREST INTEREST EARNED JANUARY 2016
07 FUND
1601 0.00 110.59 -110.59
1602 51651 103.56 03/01/16 INTEREST INTEREST EARNED FEBRUARY 2016
07 FUND
1602 0.00 103.56 -214.15
1603 52095 109.26 04/04/16 INTEREST INTEREST EARNED MARCH 2016
07 FUND
1603 0.00 109.26 -323.41
1604 52568 105.33 05/03/16 INTEREST INTEREST EARNED APRIL 2016
07 FUND

East Goshen Township General Ledger
Report Date 05/05/16 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 3 : 26 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1604 0.00 105.33 -428.74
07341-1020 **** *** ***** 0.00 428.74 -428.74
07364-1110 R.C.TAPPING FEES 0.00
1601 CR 51204 5,004.00 01/28/16 1247 7875 1 SUNNY RIDGE FARMS LLC
1601 0.00 5,004.00 -5,004.00
1602 RE 51557 7,148.00 02/23/16 51557 1 TAP IN FEE-957 CORNWALLIS DR
1602 0.00 7,148.00 -12,152.00
07364-1110 **** *** ***** 0.00 12,152.00 -12,152.00
07364-1130 CONNECTION FEES - SEWER 0.00
CR 51318 423.00 02/05/16 804 9354 1 GEORGE SMITH & CHRISTINA CONLE
51322 423.00 02/05/16 344 9356 1 JACOBS, ROBERT & CHERYL
51357 423.00 02/08/16 2435 9355 1 STOFFLET, MICHAEL
JE 51319 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51323 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51358 141.12 02/08/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1602 423.36 1,269.00 -845.64
07364-1130 **** *** ***** 423.36 1,269.00 -845.64
07380-1000 MISCELLANEOUS REVENUE 0.00
51319 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51323 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51358 141.12 02/08/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1602 0.00 423.36 -423.36
07380-1000 **** *** ***** 0.00 423.36 -423.36

East Goshen Township General Ledger
Report Date 05/05/16 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 3 : 26 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1603 52022 25,000.00 03/28/16 DEPOSIT DEPOSIT TO MUNICIPAL ACCT.
1603 0.00 25,000.00 -25,000.00
07392-0500 **** *** ***** 0.00 25,000.00 -25,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
CD 51990 7,705.49 03/24/16 3013 425 EAST GOSHEN TOWNSHIP - GENERAL
Q1 2016 REIMBURSEMENT FROM MUN.A
1603 7,705.49 0.00 7,705.49
07424-1400 **** *** ***** 7,705.49 0.00 7,705.49
07424-3000 MISCELLANEOUS EXPENSE 0.00
1601 50894 978.00 01/04/16 3004 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2016 ACTIVE MEMBERSHIP DUES
51002 163.62 01/18/16 3005 2967 SAFEGUARD
CHECK ORDER FEE
51028 500.00 01/14/16 3006 2737 COMMONWEALTH OF PA
NPDES PERMITS -CHAP.92A 2016
PERMIT# PA0050504
1601 1,641.62 0.00 1,641.62
07424-3000 **** *** ***** 1,641.62 0.00 1,641.62
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1604 52313 7,500.00 04/18/16 3015 808 MAILLIE FALCONIERO & CO.
FINANCIAL STMT. EXAMINATION 2015
1604 7,500.00 0.00 7,500.00
07424-3110 **** *** ***** 7,500.00 0.00 7,500.00
07424-3130 ENGINEERING SERVICES 0.00
1602 51394 5,905.25 02/10/16 3008 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/17/16 RCSTP & PU
STATION O&M MANUAL

East Goshen Township General Ledger
Report Date 05/05/16 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 3 : 26 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1602 CD 51527 1,063.75 02/23/16 3010 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/13/16 2015 GEN.SER
1602 6,969.00 0.00 6,969.00
1603 51813 9,874.50 03/15/16 3012 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/14/16 RCSTP PS O
1603 9,874.50 0.00 16,843.50
1604 52227 6,491.75 04/12/16 3014 1052 PENNONI ASSOCIATES INC.
SERV.THRU 3/20/16 WHITE CHIMNEY
1604 6,491.75 0.00 23,335.25
07424-3130 **** *** ***** 23,335.25 0.00 23,335.25
07424-3140 LEGAL SERVICES 0.00
1601 51149 400.00 12/17/15 3007 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES 12/14/15 - GEN.AU
1601 400.00 0.00 400.00
1602 51503 480.00 02/19/16 3009 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 1/11-1/29/16 GEN.A
1602 480.00 0.00 880.00
1603 51813 1,523.50 03/15/16 3011 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE FEB.2016 - GEN. AU
1603 1,523.50 0.00 2,403.50
1604 52428 540.00 04/21/16 3016 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE MARCH 2016 GEN.AUT
1604 540.00 0.00 2,943.50
07424-3140 **** *** ***** 2,943.50 0.00 2,943.50

East Goshen Township General Ledger
Report Date 05/05/16 GL Transaction Details PAGE 5
MGRP18 run by BRIAN 3 : 26 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1602 51395 2,565.50 02/10/16 103 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 1/17/16 RESERV.RD.P
51528 16,747.75 02/23/16 104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 12/13/15 RESERV.RD
1602 19,313.25 0.00 19,313.25
1603 51812 1,934.75 03/15/16 105 1052 PENNONI ASSOCIATES INC.
SERV. THRU 2/14/16 RESERV.RD PS
PENNDOT HOP
52048 1,000.00 03/30/16 106 1496 WILLIAM WOOD CO.
SEWER EASEMENT -1636 BOW TREE DR
1603 2,934.75 0.00 22,248.00
1604 52173 500.00 04/07/16 107 3110 COMMONWEALTH OF PENNSYLVANIA
WQM PERMIT APPLICATION
52226 3,972.75 04/12/16 108 1052 PENNONI ASSOCIATES INC.
SERV. THRU 3/20/16 PH.11 RESERV
PS DESIGN
52469 1,050.00 04/25/16 109 3671 PENNDOT
PERMIT - HOP APPLICATION #100373
1604 5,522.75 0.00 27,770.75
07428-1000 **** *** ***** 27,770.75 0.00 27,770.75
Grand Total 71,319.97 39,275.17 32,044.80

[Logo: Abel Recon]

Abel Recon

P.O. Box 476, Mountville, PA 17554 - 0476 • 717/285-3103
Fax 717/285-2321 • www.abelrecon.com

May 4, 2016

Vendor #: 317637
Contract #: COSTARS-16030

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Attention: Mr. Mark Miller

RE: White Chimneys and Cornwallis Drive Manhole Rehabilitation

Mr. Miller,

We are pleased to submit the following for your above referenced project located in East Goshen Township, Chester County, Pennsylvania under COSTAR Contract # 16030. When accepted by you below, this will constitute our contract with respect to the work which is described in this proposal.

MANHOLE LINING PROPOSAL INCLUDES:

  1. Cleaning, evaluation and any necessary minor interior surface repairs to manhole structure.
  2. Application of SprayWall, as manufactured by Sprayroq. SprayWall Lining system will be applied to the interior of (19) 4-feet diameter manholes, totaling approximately 188 VF. Application will be at a thickness of 250 mils.
  3. Holiday Detection Spark Testing.
  4. By-pass gravity flow using standard flow-through equipment. General Contractor and/or Authority to provide by-pass operations for any force main flows. We anticipate pump truck bypass necessary for manholes #RO56 and #RO55 for a total of 9 hours. Per a 4/28/16 job site evaluation, all other manholes reviewed can be bypassed by Abel Recon crews utilizing flow through technology.

EAST GOSHEN MUNICIPAL AUTHORITY      ABEL RECON
2016 MANHOLE LINING PROPOSAL- COSTARS      MAY 4, 2016

Page 2 of 4

MANHOLE LINING PROPOSAL INCLUDES (continued):

  1. The following items are excluded from the present scope of work, and if required, shall be performed on a time and material basis and charged in addition to the proposal amount. Work related to the removal of temporary erosion control measures, site stabilization, installation of matting and seeding.; Access agreements and property owner coordination.; Traffic control that goes beyond traffic cones and signage.; Chemical grout applied to stop infiltration within manhole structure or any infiltration that may be present between host pipe and any existing cured-in-place liner.; By-pass pumping that exceeds the capacity of standard flow-through equipment.; Any necessary site clearing, as required for access to the work area. Access must be suitable for 2-wheel drive box truck vehicles.; Testing other than Holiday Detection testing.; Safety orientation requirements that may be required by Owner and/or General Contractor.

GENERAL NOTES:

  1. Damage caused by others, to an item constructed under this contract, will not be the responsibility of Abel Recon. In addition, when a given item of work is tested and inspected by the governing authority, that item becomes the responsibility of the Owner or General Contractor to protect and maintain.
  2. Prices for this project shall remain firm through June 4, 2016. Abel Recon reserves the right to review all prices after that date.

EAST GOSHEN MUNICIPAL AUTHORITY      ABEL RECON
2016 MANHOLE LINING PROPOSAL- COSTARS      MAY 4, 2016

Page 3 of 4

  1. Invoices shall be submitted twice monthly. Payment shall be due within thirty (30) days after completion of the work invoiced. Abel Recon reserves the option to charge interest on any monies owed after thirty (30) days. Interest, if assessed, will be at Fulton Bank prevailing prime plus 2%. Abel Recon will invoice for work completed only, and will not be subject to any contract retainage.
  2. Any alteration is to be agreed upon in writing by the Owner or General Contractor and Abel Recon.
  3. Proposal is based on PA Prevailing Wage Rates.
  4. Abel Recon reserves the right to set schedules based on weather, temperature conditions and equipment availability. Abel Recon is currently experiencing a 1 month lead time with manhole lining projects.
  5. This Proposal excludes any Bonds or Permits.
  6. Any dispute under this contract shall be resolved in Lancaster County, Pennsylvania and will be interpreted under Pennsylvania law including, but not limited to, the Contractor Act and Subcontractor Payment Act.

PROPOSAL BREAKDOWN:

Manhole Rehabilitation      -      $70,160.00 = $373.20 / VF

  • (19) 4 Feet Diameter Manhole Structures= 188 Vertical Feet
  • The per Vertical Feet unit measures invert to base of rim casting

EAST GOSHEN MUNICIPAL AUTHORITY      ABEL RECON
2016 MANHOLE LINING PROPOSAL- COSTARS      MAY 4, 2016

Page 4 of 4

Thank you for the opportunity to quote this project. Should you accept this proposal, please sign, date and return proposal along with a purchase order. The purchase order should include the COSTARS Contract Number and your COSTARS Member Name and Number.

Respectfully submitted,

ABEL RECON

[Signature: Scot W. Snyder]

SCOT W. SNYDER
Project Manager

HAP WITMER
General Manager

ACCEPTED:

East Goshen Municipal Authority                                  Date

(Print Name and Title)

H:\ABEL RECON\PROPOSAL TEMPLATES\Master Proposal - Abel Recon 032212.doc

EGMA 1601

[Logo: Pennoni]

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: May 5, 2016
SUBJECT: Project Budgets

Following is the budget status and/or projected budgets for ongoing projects, some of which may require Municipal Authority approval to proceed.

EGMA1504 – Reservoir Road Pump Station
Project was approximately at the estimated T&M budget as of the 4/17/16 invoices. We still need to complete NPDES plan and application revisions to address CCCD’s comments and to assemble the full bid document once all permits have been issued. Although not a CCCD comment, we identified an error in the stormwater design calculations while addressing their other comments that necessitated a partial re-design of the stormwater facilities. We are not charging for this re-design effort, which was approximately 30 hours of time. Other CCCD comment revisions, responses to any minor comments from PADEP on the WQM Permit application, and future bid document assembly is projected to be an additional $6,000-$7,000.

EGMA1505 – O&M Plan
Well under budget at this time, but all budget is expected to be ultimately needed.

EGMA1601 – 2016 General Services
On budget for approved annual fee through first 4 months of year.

EGMA1602 – Semi-Annual I&I Reports
On budget for approved annual fee through first 4 months of year

EGMA1603 – 2015 Chapter 94 Reports
Completed for half of approved annual fee with $7,538 unused. Recommend holding approx $400 of that unused budget in case PADEP has any review comments.

EGMA1604 – White Chimneys & Cornwallis Drive Manhole Lining

  • The supplemental budget approved by the MA in April is projected to be adequate to complete the bid document and bid assistance work through construction contract award.
  • Our scope does not include construction inspection or construction phase office support. The contractor is projecting 10-12 work days for construction. Half-time inspection plus 6-8 hours of engineering office support would be approximately $5,000.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2016\Project Budget Memo 2016-05-05.docx

EGMA 1601

EGMA1605 – White Chimneys Manhole Replacement
The field survey and plan preparation is projected to be $5,000-6,000. Add an additional $1,000-$2,000 for construction phase services and inspection/oversight. May require approval by MA.

EGMA1606 – RCSTP NPDES Permit Renewal Application
The application is projected to be $4,500-6,000. May require approval by MA.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2016\Project Budget Memo 2016-05-05.docx

[Logo: Commonwealth Engineers, Inc.]

COMMONWEALTH ENGINEERS, INC.

114 East Lancaster Avenue ~ Second Floor ~ Downingtown, PA 19335
Telephone: (610) 518-9003 ~ Fax: (610) 518-9004 ~ comeng@cei-1.com

April 29, 2016

Mr. Mark Miller
Director of Public Works
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Re: Sewer Availability Letter for Brakman Property, East Goshen Township

Dear Mr. Miller,

Commonwealth Engineers, Inc., hereby requests a standard Sewer Availability Letter for the project detailed below. A location map and Project Narrative have been enclosed for your use.

Project Name: Brakman Property
Project Location: 1420 East Strasburg Road, West Chester (Parcel No. 5306 0089 0000)
5.079 Acres
Project Description: Subdivision of one (1) parcel into three (3) lots. Lot 1 contains one existing single-family dwelling (to remain) served by public water and on-site sewer. Lots 2 & 3 will each contain one single-family dwelling to be served by public water and sewer.
Lot 1 – 1 Proposed EDU for Existing Single Family Dwelling
(currently utilizing on-site sewer)
211.5 gpd
Lot 2 – 1 Proposed EDU for 1 Single-Family Dwelling 211.5 gpd
Lot 3 – 1 Proposed EDU for 1 Single-Family Dwelling 211.5 gpd
Total of 3 Requested EDU's 634.5 gpd

Also, please provide us with any existing plans (if available), a Sewage Flow Map (for use with the Component 3 Sewage Facilities Planning Module) and the manhole number for discharge.

Please call if you have any questions or require additional information. My email is ttran@cei-1.com.

Sincerely,

[Signature: Thomas Tran]

Thomas Tran, P.E.
Project Engineer

Enclosures:

G:\ACTIVE JOBS\2015\201541 Brakman Property\01 Administrative Files\03 Sewer & Water\201541 Sewer Will Serve Request_2016-04-29.doc

PROFESSIONAL CIVIL ENGINEERING

[Street location map of East Goshen Township and surrounding area with the project site marked "SITE" on East Strasburg Road. Labels include EAST GOSHEN, WILLISTOWN, WESTTOWN, Chester Road and West Chester Pike.]

LOCATION MAP
FOR
BRAKMAN PROPERTY

EAST GOSHEN TOWNSHIP    CHESTER COUNTY, PA

GRAPHIC SCALE 1" = 2000'
0   2000   4000   6000
GRAPHIC SCALE IN FEET

[Logo: Commonwealth Engineers, Inc.]

COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE ~ SECOND FLOOR
DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004
COMENG@CEI-1.COM

DATE:SCALE:SURVEY:DRAWN:CHECKED:DRAWING NO.SHEET:
NAAS SHOWNNANANANA1