Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

June 13, 2016
6:00 PM

At 6:00 pm, the members of the Authority intend to visit the West Goshen Township Westtown Way Pump Station, located at 837 Falcon Lane, West Chester, PA 19382. Accordingly, there is a chance that regular meeting may not start promptly at 7:00 pm.

7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s , April and May Reports
  4. APPROVAL OF MINUTES May 9, 2016
  5. APPROVAL OF INVOICES a. Donal Pusey – Easement $ 690.00 b. Pennoni Invoice #692533 $3,032.25 c. Pennoni Invoice #692534 $ 174.25 d. Pennoni Invoice #692535 $ 948.75 e. Pennoni Invoice #692536 $1,510.50 f. Pennoni Invoice #692537 $1,287.00 g. Pennoni Invoice #692538 $4,595.75 h. Pennoni Invoice #692539 $1,487.00 i. Gawthrop Invoice#145866 $1,080.00 Pd.
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS May 2016 Report; Annual Report of Municipal Authorities; Audited Financial Statements;

F:\Data\Shared Data\Agendas\Municipal Authority\2016\6-13-16.doc

  1. OLD BUSINESS Approval of for request for the connection of 1420 E. Strasburg Road and the 2 new dwelling units.; Authorize Chairman to Execute Easement
  2. GOALS Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, February, March, April; Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively “I&I”) Plan to reduce the amount of I&I into the sewer system.; Respond to capacity requests within 45 days. Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. 943 Cornwallis Drive, 1420 East Strasburg Road; Submit topical articles of interest for the East Goshen newsletter. Winter, Summer; Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March, May, June
  3. NEW BUSINESS
  4. CAPACITY REQUESTS 1329 North Chester Road – 1 EDU; 1631 Hunter Circle – 1 EDU
  5. ANY OTHER MATTER
  6. CORRESPONDENCE AND REPORTS OF INTEREST
  7. PUBLIC COMMENT
  8. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2016\6-13-16.doc

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

June 10, 2016

EGMA1601

VIA EMAIL

Rick Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: 2015 Wastewater Treatment and Pumping Facilities Capital Improvement Plan
West Goshen Township

Dear Rick:

As requested, we performed a cursory review of West Goshen's 2015 Wastewater Treatment and Pumping Facilities Capital Improvement Plan dated January 2016 and the 2015 Wastewater Treatment and Pumping Facilities Capital Improvement Plan Status Report dated February 3, 2016, as prepared by HRG. Our review was performed on behalf of the East Goshen Municipal Authority since East Goshen may be responsible for a portion of the costs associated with the proposed West Goshen STP and Westtown Way Pump Station improvements. We have not performed any field visits to the subject facilities nor had discussions with West Goshen's staff or consultant so our review is solely based upon the information presented in the reports.

Summary

In summary, it does appear that the proposed work in this Capital Improvement Plan does need to be performed. We recognize that West Goshen needs to complete additional studies prior to setting final priorities and budgets, including the phosphorus reduction study. As proposed in the report, any upgrades that will be required to meet or will be affected by revised TMDL driven limits should be avoided until the TMDL's are set and the revised limits are known.

Comments

We offer the following comments for your consideration:

  1. As part of the overall headworks upgrade, consideration should be given to replacing the fine screen with an upright or vertical bar screen. The accumulation of debris throughout a wastewater treatment can be detrimental to the operation. A headworks upgrade would be a good opportunity to introduce a fine screen.
  2. A number of plants in the area were constructed prior to the implementation of NFPA 820 Standard for Fire Protection in Wastewater Treatment and Collection Facilities, which was first published in 1990. Prior to its publication, headworks rooms and anaerobic digestion facilities, in particular, were not constructed using these standards. Some facilities were constructed using explosion proof wiring, but others such as the West Goshen plant were not. These standards were developed in response to explosive hazardous, and their recommendations should be implemented as part of any upgrade.

EGMA1601
June 10, 2016
Page 2
Rick Smith, Township Manager
West Goshen Capital Improvements Plan

  1. Under Headworks improvements, there is mention of replacing a control panel and MCC section. We would suggest that this equipment would be also moved to the Headworks Electrical Room.
  2. Consideration should be given to a positive ventilation system for the Headworks Electrical Room.
  3. Our experience with the Grit King is good. Derry Township has also implemented the Grit King with the same success. It may be difficult to install two Grit Kings for the peak flow of 15 MGD. Consideration should be given to one Grit King with a bypass of flows above 6.5 MGD.
  4. Consideration should be given to budgeting for the replacement of clarifier drives. Also, each clarifier scrapper mechanism should be inspected for repair and recoating or replacement.
  5. Anaerobic Digestion does have the potential for a substantial disposal cost savings as compared to other aerobic digestion. Anaerobic digestion would also produce a Class B sludge. The only Aerobic Digestion that could be guaranteed to produce a Class B sludge is the ATAD process. Prior to embarking on a particular process, we would recommend that Life Cycle Costs be considered. Anaerobic Digestion with the correct sludge storage, mixing, and management can be very effective. As eluded to in the report, part of the analysis needs to be any future effect that the TMDL determination may have.
  6. The Aeration Basin Improvement Cost estimate seems low for the proposed upgrades.
  7. At this time, we do not have an opinion of the merits of the Volute Press. The pilot test does seem encouraging.
  8. Electrical upgrades for a plant of this vintage are unavoidable. Other plants in the area constructed around the same time have replaced or upgraded main transformers, emergency generators, and other electrical gear.
  9. For the electrical service alternatives, we have been implementing the Utility Maintained Service in Lower Merion. The rate structure incentives for taking medium voltage and owning the main transformer have gone away over the years.
  10. The report mentions providing a connection for a temporary generator. Consideration should be given to using smaller generators that could be synchronized. If one of the generators is lost, then there would be at least partial power available. For a load of this size, there may be a monthly payment to maintain access to a rental generator.

If you have any questions or need additional information, please call.

Sincerely,

PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Municipal Authority Engineer

cc: Mark Miller, Public Works Director (via email)
Nate Cline, PE, Township Engineer (via email)
Tim Daily, PE, Pennoni (via email)

W:\PROJECTS\EGMA\EGMA1601-2016 General Services\WGSTP Capital Improvements Plan\WGSTP Cap Improv Plan Rvw Ltr 2016-06-10.docx

COUNTY OF CHESTER, PENNSYLVANIA - Map

Handwritten Notes:
MONDAY 6-13-16 6 PM
PARKING [arrow pointing to parking lot at parcel 52-6K-14]
PUMP STATION [X marking structure on parcel 52-6K-16]

Map Information

  • Map Created: Thursday, June 09, 2016
  • Source: County of Chester
  • Scale: 0, 50, 100, 200 Feet (1 inch = 100 feet)
  • Limitations of Liability and Use: County of Chester, Pennsylvania makes no claims to the completeness, accuracy, or content of any data contained herein, and makes no representation of any kind, including, but not limited to, the warranties of merchantability or fitness for a particular use, nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. For information on data sources visit the GIS Services page listed at www.chesco.org/gis.

Roads & Parcels Shown

  • Roads: Falcon LA, Westtown RD, Westtown Wy, Little Shiloh RD
  • Parcels: 52-6-14.1 (1.3 AC.); 1 | 52-6-13 (0.9 AC.); 52-6-14.2 (8.9 AC.); 52-6-14 (1 AC.); 67-2-25.2 (80 AC.); 62; 63 | 52-6K-14 (0.41 AC.); 64 | 52-6K-15 (0.47 AC.); 65 | 52-6K-16 (0.68 AC.); 52-6-15 (0.48 AC.); 66 | 52-6K-17 (0.39 AC.); 32 | 52-6J-93 (0.41 AC.); 31 | 52-6J-94 (0.42 AC.); 30 | 52-6J-95 (0.37 AC.); 52-6-16.2 (8.2 AC.); 47 | 52-6-21.49 (1.14 AC.); 48; 52-6-27 (2.3 AC.); 67-2-19 (0.31 AC.)

2015 Capital Improvement Plan
Wastewater Treatment and Pumping Facilities
West Goshen Township, Chester County, PA
Page 60

  • The existing medium voltage service is owned/maintained by the Authority/Township. The service should be replaced. One option is to replace the medium voltage gear in kind, and West Goshen will retain ownership and maintenance responsibilities for the service. The second option would be to convert the station to receive secondary power from the utility, transferring ownership and maintenance to the utility. The first option has a higher up-front capital investment, while the second option would have a smaller initial cost with higher periodic costs to the utility. Given the fact that West Goshen must subcontract the maintenance work, it is recommended that the conversion to secondary power be done.

Table 6-7 Washington Street Cost Estimate

IMPROVEMENTS COST
General$126,500
Site Work$15,500
Pump Building$139,750
Wet Well$83,100
Electrical/Controls$425,500
Total with Contingencies$988,000

6.8 #13 WESTTOWN WAY

The Westtown Way Pump Station is a dry pit submersible style pump station constructed in the late 1970's. The pump station structure consists of a single brick masonry building containing a concrete dry well and an exterior concrete wet well that shares a common wall with the building.

This pump station was initially constructed as a duplex style station with shaft driven pumps with provisions for the installation of a third pump in the future. It is unknown when the third of pump was installed, but in the current pumps were installed in 2001. The current pumps consist of two – shaft driven pumps and one dry pit submersible pump. The wet well initially contained an influent comminutor, this has since been replaced with a hydraulic driven influent sewage grinder. According to the West Goshen Chapter 94 Report for 2014, this pump station has a capacity of 5,400 gpm or (7,776,000 gallons per day [gpd]) and the projected 2-Year Max Daily Flow capacity is 61%.

Based on HRG's review of the pump station and through discussion with the Township Staff, the following deficiencies were noted at the Westtown Way Pump Station and proposed repairs and rehabilitation items are listed below:

  • The current means and method of pump and motor removal at the pump station is very difficult as the floor openings are not located above the pumps. This requires Township Staff to have to maneuver the pumps and motors horizontally in order to lift the pumps out. Township Staff reported that an employee was injured during this work in the past. The installation of a pump removal system similar to that installed at Taylor Run Pump Station should be considered. For purposes of this Plan we have not included an estimated cost of this system. A study must be performed to determine the structural requirements needed for the pump removal system and what if any improvements must be made to the building to support it.
  • The wet well contains raw waste which results in a NEC Class I Div. I hazardous area electrical classification. The electrical lighting in the wet well is not rated for use in

2015 Capital Improvement Plan
Wastewater Treatment and Pumping Facilities
West Goshen Township, Chester County, PA
Page 61

hazardous areas. In addition, significant corrosion of the electrical components in the wet well was observed.

  • Proposed improvement – Upgrade electrical equipment in the wet well to meet hazardous area requirements.
  • Concrete and ferrous metal deterioration from exposure to hydrogen sulfide gas was observed in the wet well. Further investigation is needed to determine the extent of the concrete deterioration throughout the wet well.
  • Proposed improvement – Complete investigation to determine full extent of concrete and ferrous metal deterioration. Repair deteriorated concrete and possibly add liner to prevent future deterioration. Repair and replace ferrous metal as necessary and coat/paint to prevent future deterioration.
  • Township Staff reported and HRG observed grease accumulation in the wet well. Operation staff noted that they currently pump down the wet well and try to pump the grease to the WWTP. Proposed improvement – Investigate requiring/enforcing grease removal at establishments to remove grease before it enters the wastewater collection system. Also investigate the installation of a wet well mixing system to keep grease in suspension in the wastewater and prevent from accumulating in the wet well.
  • Township Staff noted that they have discovered significant amounts of grit settling out in the influent channel and interceptor piping upstream of the pump station. The headloss associated with the influent sewage grinder can cause water to backup into the interceptor piping. Proposed improvement – Relocation of the influent sewage grinder to the end of the influent channel to reduce the headloss impact. This may require the installation of new a new railing system to support the sewage grinder.
  • The existing windows in the building are original. The building is heated in the winter and upgrading of these facilities to new energy efficient units would be beneficial. Proposed improvement – Replace existing windows.

Figure 6-9 Westtown Way Equipment
Photograph showing industrial pipes, valves, and mechanical pumping equipment inside the Westtown Way Pump Station.

  • All HVAC equipment in the building is original and Township Staff reports that various units no longer function.

2015 Capital Improvement Plan
Wastewater Treatment and Pumping Facilities
West Goshen Township, Chester County, PA
Page 62

  • Proposed improvement – Repair, replace and upgrade existing HVAC equipment. Block in any building penetrations no longer needed.
  • HRG observed infiltration on the pump level of the dry well at various locations. Proposed improvement – Seal leaking wall penetrations.
  • Township Staff reported that the floor drain piping in the building is no longer functioning and that they have tried to unclog it but have been unsuccessful. Proposed improvement – Cut new floor drain piping into the floor.
  • Township staff reported that the existing force main discharge gate valve has failed in the open position and can no longer close when necessary. Proposed improvement – Replace existing valve with a new gate valve. This will require the installation of a temporary line stop or new valve outside of the pump station in order to prevent wastewater from draining out of the force main. In addition, a means of maintaining flow through the pump station during this work must be provided.
  • The existing emergency generator is original to the pump station. Township staff have requested that the existing generator be replaced and prefer the installation of an exterior rated emergency generator. The Authority's CES recommended replacement of the existing generator.
  • The existing diesel fuel tank for the emergency generator is located outside above the wet well. If the emergency generator is replaced with an exterior rated unit, a subbase fuel tank can be combined into the base for the new generator.
  • Township staff reported and HRG confirmed with the equipment representative that the existing Safetronics VFDs are no longer supported by the manufacturer and obtaining parts to repair is very difficult. Proposed improvement – Install new VFDs.
  • The existing electrical motor control center (MCC) appear to be original to the station and Township staff have requested replacement of the existing MCC. Replacement of the electrical MCC should be considered.
  • A method of monitoring flows through the pump station should be provided. Proposed improvements – Install discharge flow meter. Due to configuration of pump header discharge piping in the dry well, the installation of a standard magnetic flow meter may not be possible due to straight pipe requirement before and after the meter, but a Toshiba Mount Anywhere magnetic flow meter which doesn't have the same straight pipe requirements could be installed.
  • Gas detection equipment (to verify suitable atmosphere) was not observed in the wet well. Operations staff frequently enter these areas when checking and maintaining the pump station.

2015 Capital Improvement Plan
Wastewater Treatment and Pumping Facilities
West Goshen Township, Chester County, PA
Page 63

  • Proposed equipment – Install gas detection equipment in the wet well.
  • The existing pumps were installed in 2001. Mechanical equipment typically has an expected service life of 20 years. Replacement of these pumps due to age within the next five years is not anticipated, however the pumps will be approaching 20 years at the end of five years. Township staff have been transitioning from shaft driven pumps to dry pit submersible style pumps as pump stations are upgraded. Future upgrades to this station should consider evaluating this transition here as well. Township staff have also noted that due to the high head operating conditions associated with this pump station, the switching to series pumping (6 total pumps) may be beneficial. A study to evaluate the effectiveness of switching to a series pumping configuration would have to be performed.
  • Installation of a pump station force main bypass connection should also be considered. The bypass connection allows the ability to use the existing force main through use of a bypass pump(s) in the event that the existing pumps are inoperable, and the ability to use the existing pumps to through use of pump and haul or a temporary force main in the event the existing force main is inoperable.
  • Holes in the existing chain link fence fabric around the electrical switchgear were observed and should be repaired or new fence fabric installed.
  • Consider installation of a data logger or influent flow meter to monitor influent flows to the pump station.
  • The existing medium voltage service is owned/maintained by the Authority/Township. The service should be replaced. One option is to replace the medium voltage gear in kind, and West Goshen will retain ownership and maintenance responsibilities for the service. The second option would be to convert the station to receive secondary power from the utility, transferring ownership and maintenance to the utility. The first option has a higher up-front capital investment, while the second option would have a smaller initial cost with higher periodic costs to the utility. Given the fact that West Goshen must subcontract the maintenance work, it is recommended that the conversion to secondary power be done.
  • The louver over the wet well should be modified so the base of the louver is more than 18 inches above the top of the wet well tank. The louver size can be reduced, as it is currently sized to allow aspiration of the indoor generator. If the indoor unit is replaced with an outdoor unit, the louver size can be reduced.

Table 6-8 Westtown Way Cost Estimate

IMPROVEMENTS COST
General$199,000
Site Work$5,500
Pump Building$590,800
Wet Well$109,900
Electrical/Controls$382,500
Total with Contingencies$1,610,000

HRG
Herbert, Rowland & Grubic, Inc.
Engineering & Related Services
AN EMPLOYEE-OWNED COMPANY

369 East Park Drive
Harrisburg, PA 17111
Phone: (717) 564-1121
Fax: (717) 564-1158

OPINION OF PROBABLE CONSTRUCTION COST ESTIMATE
FOR
PUMP STATION NO. 13 - WESTTOWN WAY IMPROVEMENTS
CAPITAL IMPROVEMENTS PLAN
WEST GOSHEN PUMPING FACILITIES
DECEMBER 2015

ITEM NO. DESCRIPTION EST. QTY. UNIT UNIT COST EXTENSION
GENERAL
1MOBILIZATION AND PROJECT MANAGEMENT (5%)1L.S.$ 54,500.00$ 54,500.00
2BONDS & INSURANCES (2%)1L.S.$ 21,800.00$ 21,800.00
3DEMOLITION (3%)1L.S.$ 32,700.00$ 32,700.00
4BYPASS PUMPING30DAY$ 3,000.00$ 90,000.00
SITE
5E&S CONTROL1L.S.$ 2,500.00$ 2,500.00
6CHAIN LINK FENCE REPAIRS AROUND SWITCHGEAR1L.S.$ 1,000.00$ 1,000.00
7VEGATATIVE RESTORATION1L.S.$ 2,000.00$ 2,000.00
PUMP BUILDING
8REPLACE WINDOWS1L.S.$ 3,000.00$ 3,000.00
9BLOCK-IN ABANDONED HVAC VENTILATION LOUVERS1L.S.$ 6,000.00$ 6,000.00
10REPLACE ALL HVAC EQUIPMENT1L.S.$ 40,000.00$ 40,000.00
11REPAIR FLOOR DRAIN PIPING1L.S.$ 5,000.00$ 5,000.00
12250 HP DRY PIT SUBMERSIBLE PUMP3EA.$ 147,525.00$ 442,575.00
13INSTALL 16" MAG METER AND CHART RECORDER1L.S.$ 17,250.00$ 17,250.00
14PUMP REMOVAL SYSTEM FLOOR OPENINGS AND STEEL SUPPORTS1L.S.$ 32,000.00$ 32,000.00
15OVERHEAD WIRE ROPE HOIST1L.S.$ 36,000.00$ 36,000.00
16REPAIR WATER INFILTRATION FROM WET WELL IN DRY WELL1L.S.$ 5,000.00$ 5,000.00
17PUMP STATION DATA LOGGER1L.S.$ 4,000.00$ 4,000.00
WET WELL
18PROVIDE COMBUSTIBLE GAS DETECTOR IN WET WELL1L.S.$ 10,900.00$ 10,900.00
19CONCRETE CRACK/SPALLING REPAIRS420S.F.$ 150.00$ 63,000.00
20REPAIR/REPLACE CAST IRON DRAIN PIPING1L.S.$ 2,000.00$ 2,000.00
21NEW WET WELL MIXING SYSTEM1L.S.$ 24,000.00$ 24,000.00
22ADJUST INFLUENT SEWAGE GRINDER TO HELP MINIMIZE GRIT DEPOSITION1L.S.$ 7,500.00$ 7,500.00
23NEW ACCESS HATCH ABOVE INFLUENT SEWAGE GRINDER1L.S.$ 2,500.00$ 2,500.00
ELECTRICAL/CONTROLS
24DEMOLITION OF EXISTING ELECTRICAL1LS$ 20,000.00$ 20,000.00
25XP LED LIGHTING IN WETWELL1LS$ 1,500.00$ 1,500.00
26REPLACEMENT OF INTERIOR LIGHTS WITH LED1LS$ 10,000.00$ 10,000.00
271000A SERVICE ENTRANCE RATED ATS, 480Y/277V1LS$ 30,000.00$ 30,000.00
28250HP VFD3EA$ 54,000.00$ 38,000.00
29EMERGENCY SHUT DOWN SWITCHES FOR PUMPS1LS$ 3,000.00$ 3,000.00
30NEW POWER DISTRIBUTION PANELS TO REPLACE MCC1LS$ 25,000.00$ 25,000.00
31XP RATED CONDUIT & WIRING IN WETWELL1LS$ 5,000.00$ 5,000.00
32500KW OUTDOOR GENERATOR1LS$ 160,000.00$ 160,000.00
33GENERATOR PLATFORM TO RAISE ABOVE FLOOD PLAIN1LS$ 30,000.00$ 30,000.00
34OPTION 1 FOR NEW ELECTRICAL SERVICE: NEW MEDIUM VOLTAGE SERVICE GEAR1LS$ 150,000.00
35OPTION 2 FOR NEW ELECTRICAL SERVICE: NEW SECONDARY SERVICE AT 480Y/277V1LS$ 60,000.00$ 60,000.00
SUBTOTAL$ 1,287,725.00
CONTINGENCY (25%)$ 321,931.25
TOTAL$ 1,609,656.25
SAY$ 1,610,000.00

ASSUMPTIONS:
Concrete crack/spalling repairs - Assumes 6 V.F. of concrete around wet well walls to be repaired.
Assumes building floors can support new openings directly over pumps to allow for pump removal.

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 10, 2016

To:Municipal Authority
From:Mark Miller
Re:May 2016 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 860,000.

Meters: The month was relatively uneventful; the meters pumping stations were visited on a regular basis, I’m happy to report that there were no problems for the month. All meters were calibrated and read on a daily basis, the portable meters were checked and all info was downloaded.

Chester Creek Pump: The pumping stations were visited on a routine basis with no problems to report.

Hunt Country Pump: Was visited on a daily basis.

C.C. Collection: As I stated above the stations were checked on a daily basis with no problems to report. We replaced 25 casting and lids in the White Chimneys Development in preparation of the manhole lining, the new manhole has been ordered to replace the one in the driveway on Marie Road. The casting and lids are in good condition on Cornwallis Drive. We replaced a dozen cleanout stacks and caps at various locations.

R.C. Collection: The work on the station has started; MGK installed the new top and hatch. The actual pump and rail system is next. This should take place in the next 3 weeks. We have ordered material to expand the pump station building that will house the controls new generator. I have sent letters out to the two neighbors asking to meet with them to answer any questions that may have. We replaced several caps on the system.

R.C. Plant: Scott pumped the SBR tank 4 over to SBR tank 2; the tank was pumped down and washed down. Pennoni will inspect the tank per the agreement. We received pump three back from Deckman Electric for the wet well. We will pull the pumps in SBR tank 4 and have them checked. We cleaned the grit chamber in the screen building.

Lochwood Plant: We had to complete some addition grading of the site. Rick reached out to the HOA who have requested that we remove the fence that surrounded the ponds and leave the fence separates their property from the Millstream Drive development.

Alarms: We responded to 21 alarms for May.

PA One Calls: We received 75 Pa One calls May.

EGMA 1601

Pennoni

MEMORANDUM

TO:East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM:Michael Ellis, P.E.
Authority Engineer
DATE:June 10, 2016
SUBJECT:Engineer's Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • The NPDES Permit expires on February 28, 2017. The permit renewal application is due to PADEP by September 1, 2016. We have prepared the draft application, submitted Act 14 notifications to the County and Township and received responses, and are awaiting effluent fats, oil, and grease sampling results from the plant operator. Other effluent sampling results have been provided. We anticipate submitting the application to PADEP by early July.

Reservoir Road Pump Station

  • We are still awaiting PADEP response for the Chester Creek Small Projects Joint Permit for the pump station site and Chester Creek utility crossing.
  • We revised the NPDES Permit application and plans to address comments from the Chester County Conservation District (CCCD) and resubmitted it on June 7, 2016.
  • The Water Quality Management (WQM) Permit application was submitted to PADEP on April 13, 2016. PADEP has 120 calendar days to perform their review, and we are awaiting a response.
  • We are preparing the front end of the bid document, including the bid form and Division 01 specification sections, so that the full bid document will be complete upon receipt of the remaining permits. Technical specifications were already prepared as part of the WQM Permit application.

RCSTP and Pump Stations' O&M Manual

  • Limited activity since the last report.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2016\Memo to EGMA Board 2016-06-10.docx

EGMA 1601

White Chimneys and Cornwallis Drive Manhole Lining

  • We coordinated with Abel Recon and Township staff for the lining work following contract approval. The work is tentatively scheduled to begin on June 16, 2016. We will perform part-time construction observation during the work.

White Chimneys Manhole Replacement

  • We completed the plan for replacement of the Ashbridge Pump Station force main discharge manhole (MH C-226) and submitted it to the Township for use in construction by the PW Department. We coordinated with the precast plant to fabricate the new manhole, and it is scheduled for delivery to the Township on June 13, 2016. We will provide assistance as requested by the Township during construction.

Semi-Annual I&I Reports

  • We anticipate portable meter data will be provided for our analysis within the next week, and we will then analyze and prepare a formal semi-annual report by the July MA meeting.

Sunoco Pipeline

  • We reviewed a plan submission from Sunoco for their proposed Mariner East 2 Pipeline project regarding crossings of East Goshen's sanitary sewers. We provided comments to the PW Director, and a meeting is being scheduled with Sunoco to review the comments, likely within the next two weeks.

West Goshen Capital Improvements Plan

  • We performed a cursory review of West Goshen's 2015 Wastewater Treatment and Pumping Facilities Capital Improvement Plan Status Report, as prepared by HRG, since East Goshen is anticipated to be responsible for a portion of the capital improvement costs. We submitted a review memo to the Township.

New Connections

  • 1420 E. Strasburg Road, Brakman Property – We reviewed the grinder pump system design on the Subdivision and Land Development Plans and provided comments. We attended a field meeting with Township staff and the developer to discuss the comments and to evaluate alternative sewer routing and connection locations.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2016\Memo to EGMA Board 2016-06-10.docx

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: April 2016

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during March 2016. Discharge to Applebrook was discontinued during March. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The sludge grinder was removed and sent to Deckman Electric for replacement of the head and shear plate assembly. No mechanical or operational issues were observed regarding the centrifuge sludge dewatering equipment.

Treatment Process Operation

During March 2016, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average concentration of 0.23 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the March 2016 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.18 mg/L to 0.27 mg/L.

Table 1

March 2016 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.7520125101317440.532001,000
Instantaneous Maximum 4042
Sample Date
March 1, 20160.4032.68.74133.4811.700.240.8110.0000
March 3, 20160.42527
March 8, 20160.3982.68.63100.2500.830.180.6010.0000
March 10, 20160.33926
March 15, 20160.3842.47.74130.1460.470.200.6410.0000
March 17, 20160.40613
March 22, 20160.3412.67.4260.1680.480.260.7410.0000
March 24, 20160.31125
March 29, 20160.3513.510.24120.5721.670.270.7920.3010
March 31, 20160.30225
Average0.3662.78.5380.9233.030.230.7110.0602
Minimum0.3022.47.4130.1460.470.180.6010.0000
Maximum0.4253.510.24133.48011.700.270.8120.3010

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 6

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: April 2016

Discharge to Applebrook, Outfall 002, continued to remain off line during March 2016. Table 2 illustrates the influent composite sample data reported for the March 2016.

Table 2

March 2016 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
Design Basis 3352,0983202,00132200483019.157
Sample Date
March 1, 20160.5181044497331527.712035.51532.913
March 8, 20160.51214763516872530.913335.91534.319
March 15, 20160.5201385964201,81324.710729.61283.214
March 22, 20160.46117676018981629.412742.01624.821
March 29, 20160.44622095022798034.815042.01564.419
Average0.49115761021591729.512235.81493.916
Minimum0.4461044497331524.710729.61282.913
Maximum0.520220760420181334.813342.01624.821

Table 3 presents the available Outfall 001 final effluent data for the month of April 2016. During April, the presence of foam conditions on the surface of the SBRs remained consistent with the previous month with foam concentrations ranging from 10% to 25% of the area. This is attributed to increasing water temperatures limiting the conditions for growth of filamentous bacteria. Increasing the F:M ratio and decreasing MLSS concentrations is employed to assist in managing the increase in filamentous growth.

During April, there are no anticipated exceedances of the permitted limitations for Outfall 001. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results. Brickhouse Environmental collected ground water monitoring well samples from the Applebrook site.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 6

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: April 2016

Table 3

April 2016 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.7520125101317440.532001,000
Instantaneous Maximum 4042
Sample Date
April 5, 20160.3612.47.2130.551.660.100.3040.6021
April 7, 20160.40227
April 12, 20160.3262.05.46160.8482.310.120.3310.0000
April 14, 20160.339411
April 19, 20160.3042.05.15130.4091.040.150.3850.6990
April 21, 20160.371619
April 26, 20160.27900.160.37
April 28, 20160.2930
Average0.3342.15.9490.6021.670.130.3430.4337
Minimum0.2792.05.1100.4091.040.100.3010.0000
Maximum0.4022.47.26190.8482.310.160.3850.6990

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during April 2016.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 6

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: April 2016

Table 4

April 2016 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
Design Basis 3352,0983202,00132200483019.157
Sample Date
April 5, 20160.45215056610740435.513455.32094.115
April 12, 20160.43516963711643730.811637.21353.714
April 19, 20160.4581154346926033.012437.11425.721
April 26, 20160.401
Average0.4371455469736733.112543.21624.517
Minimum0.4011154346926030.811637.11353.714
Maximum0.45816963711643735.513455.32095.721

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during March and April. Preparations to place SBR 2 were initiated during late March. Minor repairs to SBR 2 were initiated during April and will be completed during mid-May. Repairs to SBR include:

  • Drain the remaining water from the SBR
  • Replacement of two (2) decanter valves
  • Replacement of the 1-inch PVC aluminum sulfate feed pvc piping within the SBT tank
  • Reinstall the dissolved oxygen probe
  • “Wire” the waste activated sludge pump check valve to allow transfer of the contents from SBR 4 into SBR 2.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 6

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: April 2016

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs increased to from 70.3 gpd to 74.0 gpd. Soda ash daily addition increased from 417 lbs/day to 466 lbs/day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

Solids Dewatering and Disposal: April 2016

Sludge Dewatering Summary
Gallons of sludge dewatered158,475
Number of dumpsters2-1/2

*Eleven (11) days of centrifuge operation

Flow data:

Flow Meter Location April 2016
Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building*13.097436,577526,710
Influent Wastewater to SBRs13.459448,629562,304
Internal Recycle0.50918,99150,106
Treated Effluent to Disc Filters13.099436,640522,304
Final Effluent Discharge9.921330,700402,000
Applebrook Golf CourseNo DischargeNo DischargeNo Discharge

Chemical Usage:

Chemical April 2016
Daily Average Total Monthly
Soda Ash46613,900
Aluminum Sulfate solution74.02.221
Polymer (centrifuge)0.8415.12

*Eleven (11) days of centrifuge operation

During April, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 6

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: April 2016

Sludge holding tank No. 1 was in service. The sludge levels were not measured and recorded as the result of a failed pressure transducer. The level pressure transducer was replaced with a sonar level sensor. Allied Control Systems (ACS) has been contacted to adjust the level range within the plc program. The levels are measured locally at the tank, rather than through the Filter Feed Control panel. The average total solids concentration was 0.80%. Zero gallons of supernatant were decanted during the month. Zero pounds of soda ash were added.

Sludge holding tank No. 2 was in service. Zero pounds of soda ash were added. Zero gallons of supernatant were decanted. Testing was limited as a result of shutting down the solids dewatering operation on April16th to sending the sludge grinder for rebuild.

PA DEP

No activity

Significant Storm/Hydraulic Loading Events

During April, there was one (1) storm event resulting in a daily precipitation amount equal to or greater than 0.4 inches measured during a 24 hour period. A total of 2.98 inches of rainfall were measured during the month. This event occurred on the following dates:

  • April 7 th : 0.48 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001.

Minor Repairs and Preventative Maintenance

April 16th: Removed sludge grinder for rebuild at Deckman Electric.

April 27-30th 2016: Initiated replacement of the quartz sleeves, UV lamps, lamp O-rings, and wiper O-rings and quartz sleeve O-rings for bank number 1

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 6 of 6

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: May 2016

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during April 2016. Discharge to Applebrook was discontinued during May. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed regarding the SBR treatment process or centrifuge sludge dewatering equipment.

Treatment Process Operation

During April 2016, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average concentration of 0.13 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the April 2016 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.10 mg/L to 0.16 mg/L.

Table 1

April 2016 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
April 5, 2016 0.361 2.4 7.2 1 3 0.55 1.66 0.10 0.30 4 0.6021
April 7, 2016 0.402 2 7
April 12, 2016 0.326 2.0 5.4 6 16 0.848 2.31 0.12 0.33 1 0.0000
April 14, 2016 0.339 4 11
April 19, 2016 0.304 2.0 5.1 5 13 0.409 1.04 0.15 0.38 5 0.6990
April 21, 2016 0.371 6 19
April 26, 2016 0.279 2.0 4.7 4 9 0.61 1.41 0.16 0.37 12 1.0792
April 28, 2016 0.293 3 7
Average 0.334 2.1 5.6 4 11 0.603 1.60 0.13 0.34 4 0.5951
Minimum 0.279 2.0 4.7 1 3 0.409 1.04 0.10 0.30 1 0.0000
Maximum 0.402 2.4 7.2 6 19 0.848 2.31 0.16 0.38 12 1.0792

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 1 of 7

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: May 2016

Table 3

May 2016 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
May 3, 2016 0.372 3.1 9.6 6 19 0.595 1.85 0.10 0.31 12 1.0792
May 6, 2016 0.280 6 14
May 12, 2016 0.314 3.0 7.9 7 18 0.278 0.73 0.18 0.47 12 1.0792
May 17, 2106 0.328 1.4 3.8 4 11 0.417 1.14 1 0.0000
May 19, 2016 0.375 3 9 0.10 0.31
May 24, 2016 0.326
May 26, 2016 0.310 2 5
May 31, 2016 0.325
Average 0.329 2.5 7.1 5 13 0.430 1.24 0.13 0.36 5 0.7195
Minimum 0.280 1.4 3.8 2 5 0.278 0.73 0.10 0.31 1 0.0000
Maximum 0.375 3.1 9.6 7 19 0.595 1.85 0.18 0.47 12 1.0792

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during May 2016.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 3 of 7

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: May 2016

Table 4

May 2016 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
May 3, 2016 0.462 161 620 142 547 29.7 114 38.3 148 4.7 18
May 12, 2016 0.426 181 697 223 859 34.0 131 41.7 148 0.1 0
May 17, 2016 0.458 173 667 206 794 32.7 126 44 168 4.3 17
May 31, 2016 0.434
Average 0.445 172 661 190 733 32.1 124 41.3 155 3.0 12
Minimum 0.426 161 620 142 547 29.7 114 38.3 148 0.1 0
Maximum 0.462 181 697 223 859 34.0 131 44.0 168 4.7 18

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during April and May. Preparations to place SBR 2 were initiated during late March and completed on June 9, 2016.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs increased from 74.0 gpd to 89.2 gpd. Soda ash daily addition increased from 466 lbs/day to 534 lbs/day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 4 of 7

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: May 2016

Solids Dewatering and Disposal: May 2016

Sludge Dewatering Summary
Gallons of sludge dewatered 153,817
Number of dumpsters 4

*Seventeen (17) days of centrifuge operation

Flow data:

Flow Meter Location May 2016 Daily Maximum Flow, gpd
Total Volume for Month, MG Average Daily Flow, gpd
Influent Wastewater to Screening Building* 13.968 450,588 678,050
Influent Wastewater to SBRs 14.301 461,313 623,424
Internal Recycle 0.791 24,731 115,062
Treated Effluent to Disc Filters 14.189 457,705 594,240
Final Effluent Discharge 10.536 339,871 480,000
Applebrook Golf Course No Discharge No Discharge No Discharge

Chemical Usage:

Chemical May 2016 Daily Average Total Monthly
Soda Ash 534 16,000
Aluminum Sulfate solution 89.2 2.766
Polymer (centrifuge) 0.84 23.4

*Eleven (11) days of centrifuge operation

During May, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids. Sludge holding tank No. 1 was in service. The sludge initial level was 16.19 feet with 10.11 feet at the end of the month. The average pH concentration was 6.41 S.U., total alkalinity average of 135 mg/L and total solids concentration was 1.09%. Zero gallons of supernatant were decanted during the month. Five hundred (500) pounds of soda ash were added.

Sludge holding tank No. 2 was in service. The sludge initial level was 10.17 feet with 11.54 feet at the end of the month. The average pH concentration was 7.09

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 5 of 7

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: May 2016

S.U., total alkalinity average of 280 mg/L and total solids concentration was 0.77%. Zero gallons of supernatant were decanted during the month. Five hundred (500) pounds of soda ash were added. The sludge emitted an odor around May 17th and was corrected by May 24th. The source of the odor was the result on an aging sludge resulting from the centrifuge removed from service to repair the sludge grinder.

PA DEP

No activity

Significant Storm/Hydraulic Loading Events

During May, there were four (4) storm event resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24 hour period. A total of 5.07 inches of rainfall were measured during the month. The events occurred on the following dates:

  • May 2 nd - 0.63 inches
  • May 6 th - 1.07 inches
  • May 21 st - 0.89 inches
  • May 29 th - 0.67 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001.

Minor Repairs and Preventative Maintenance

May 5th

Lenni Electric replaced a failed UPS unit in Filter Feed control panel. Replaced unit

Troubleshoot UV panel message “Insufficient Banks Enabled”. Both bank #1 and #2 are in automatic mode. Reset alarm.

Replaced all quartz sleeve, UV lamps, O-ring, and wiper O-ring for UV bank 1. This bank has been in-service since 2010.

May 17th

Brad Baltzell from Integrated Controls Inc. (SBR Control System) stopped by the. The Flow Proportional Single Board Computer (FPSBC), which is essentially the

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 6 of 7

Big Fish Environmental Services Inc.

Ridley Creek Sewage Treatment Plant

Monthly Operations Report: May 2016

brain that does all of the calculations regarding the SBR steps, is becoming antiquated. If the current FPSBC were to fail, it would be replaced by the newest version which they call the SBRC. This new unit keeps electronic reports on an internal flash drive which is viewable via a built in web page. That would also allow remote viewing. This is essentially the brain of the whole process, and the whole SBR process would be down without it.

May 25th

All of the new radar level controllers have been installed and working properly.

John Laidley met with Joe Commons from ACS to modify the plc program so we now have access to the calibration of the EQ and Digester Levels.

The Level transducer signal for EQ tank 2 and found that the field wires between the transducer and the ACS Filter Control Panel is shorted. They did not find were it was located. After installing the new transducer, John Laidley found the short and repaired it. The EQ # 2 was still not showing up on the ACS display screen. John verified the signal is going into the PLC via the 16 Channel Analog Input Module.

It is most likely that The Input is bad (Digital Input #4). The plant may have been hit with a power surge to cause both problems. A replacement analog module is scheduled for replacement.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 7 of 7

Draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
May 9, 2016

The East Goshen Township Municipal Authority held their regular public meeting on Monday, May 9, 2016 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Dana Pizarro, Jack Yahraes, Ed McAssey, and Phil Mayer. Also in attendance were: Rick Smith (Township Manager), Mike Ellis (Pennoni), and Jessica Wiesak (Attorney).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
There was a moment of silence to remember the troops and all veterans.
Dana asked if anyone would be recording the meeting. There was no response.

CHAIRMAN’S/MEMBERS REPORTS

  1. Jack the West Goshen Sewer Authority meeting. They need to rebuild a station new the reservoir, there is an eagle’s nest in the generators, and out of the 3 pumps at the Westtown pump station only 1 is working.

Sewer Reports

  1. Director of Public Works, Mark Miller provided the following report for April: Monthly Flows: The average daily flow to West Goshen was 895,493 gallons per day. Meters: The meters were read on a daily basis. We had a problem at the Wilson Drive meter when the modem failed. Chester Creek Pump: The pumping stations were visited on a routine basis with no problems to report. Hunt Country Pump: It was visited on a daily basis. C.C. Collection: The pumping stations were visited on a routine basis with no problems to report. We did make several sewer lateral repairs (10) ranging from missing caps to actual lateral repairs. While doing a paving inspection at Summit House I found that all of their sewer vents had open grate caps throughout the complex. All of the vent pipes were excavated, mushroom caps were installed and a cast iron valve box was placed over the vent pipe, 26 were repaired.

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 5-9-16 draft.doc

1

R.C. Collection – Pump Station was visited on a daily basis. We are still cleaning the wet well due to extensive grease. The new rail system has arrived as well as the new flutes for the grinder pumps. Once the materials arrive we will have MGK start the work.

R.C. Plant: We pulled the 3rd lift station pump for maintenance.
The pipeliner pump for the Centerfuge was pulled and sent out to Deckman for repairs.
John Laidley installed the new level transducer on the #1 sludge tank. A.C.S. has to come in and set up the levels in the program.

Alarms: We responded to 16 alarms for April.

PA One Calls: We received 46 PA One calls for April.

  1. Pennoni Engineer’s Report Mike Ellis provided the following report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP): The NPDES Permit expires on February 28, 2017. The permit renewal application is due to PADEP by September 1, 2016. We have begun preparation of the application. Reservoir Rd Pump Station: We are still awaiting PADEP response for the Chester Creek Small Projects Joint Permit for the pump station site and Chester Creek utility crossing. The PennDOT Highway Occupancy Permit application for force main construction along and across E. Strasburg Road and Rt. 352 was revised and resubmitted to address PennDOT’s comments. PennDOT subsequently issued the permit on April 29, 2016. We are in the process of revising the NPDES Permit application and plan to address comments from the Chester County Conservation District (CCCD). We expect to resubmit to the CCCD the week of May 16-20. The Water Quality Management Permit application was submitted to PADEP on April 13, 2016. PADEP has 120 calendar days to perform their review. A complete bid document will be provided once the 3 remaining permits are issued. RCSTP and Pump Stations’ O&M Plan Limited activity since the last report. White Chimneys Manhole Replacement We attended a field meeting with Township staff on April 28 to evaluate alternatives for replacing vs. rehabilitating the Ashbridge Pump Station force main discharge manhole (MH C-226). We performed an existing conditions and topographic field survey thereafter, and we are currently preparing a plan of the proposed manhole replacement for use during construction by the PW Department. Semi-Annual I&I Reports We have begun analysis of data from four portable meters from March-April 2016. We intend to submit an analysis summary via email by May 13 and follow-up with a formal semi-annual report by June 30 pending receipt of additional meter data.
  2. Big Fish Environmental Services – Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during March 2016. Discharge to Applebrook was discontinued during March. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 5-9-16 draft.doc

2

sludge grinder was removed and sent to Deckman Electric for replacement of the head and shear plate assembly. No mechanical or operational issues were observed regarding the centrifuge sludge dewatering equipment.
During April, there was one storm event resulting in a daily precipitation amount equal to or greater than 0.4 inches measured during a 24 hour period. A total of 2.98 inches of rainfall were measured during the month. This event occurred on April 7th, 0.48 inches. Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitation for Outfall 001.
Minor repairs and preventative maintenance were:
April 16, 2016: Removed sludge grinder for rebuild at Deckman Electric.
April 27-30, 2016: Initiated replacement of the quartz sleeves, UV lamps, lamp O-rings and wiper O-rings and quartz sleeve O-rings for bank #1.

Approval of Minutes

Jack moved to accept the minutes of April 11, 2016 as corrected. Phil seconded the motion. The motion passed unanimously.

Approval of Invoices

  1. Ed moved to approve payment of the Gawthrop Invoice #144090 for $540.00. Phil seconded the motion. The motion passed unanimously.
  2. Phil moved to approve payment of the following Pennoni invoices: Pennoni #687506   $ 6,629.75; Pennoni #687507   $ 323.00; Pennoni #687508   $ 782.50; Pennoni #687509   $ 2,579.25; Pennoni #687510   $ 657.50 Ed seconded the motion. The motion passed unanimously.

Liaison Reports

Board of Supervisors – Carmen reported that Hibberd Lane will be closed to traffic until the East Boot Road bridge repair is done. On Wed. May 25, 2016 at 9:30 am the BOS will hold their Long Range Budget Planning meeting.

Financial Reports

Jon Altshul provided the following written report:
In April, the Municipal Authority recorded $106 in revenues (interest) and $20,055 in expenses, (including $7,500 for auditing expenses, $6,492 for general engineering services, and $5,523 for Reservoir Road Pump Station engineering), for a negative variance of $19,949. As of April 30th, the fund balance was $1,429,231 of which $1,388,525 is in the main construction account.

Goals

  1. Goals for 2016 were discussed. Jack mentioned that the electronic file with the Municipal Authority’s articles has been lost, so nothing was put in the latest newsletter. Mike gave Jack the information for an article which Jack will give to Jon Altshul.
  2. The agreement with West Goshen Municipal Authority was discussed regarding improvements vs maintenance. Patrick and Jessica will check it.

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 5-9-16 draft.doc

3

New Business

  1. Manhole Linings – Mike reported that Mark Miller, Matt and Steve went to Lancaster to inspect manholes with linings that were only 4 years old. The manholes were in very bad condition. Two weeks ago Abel Recon met to inspect the township’s manholes. They have provided a proposal for 19 – 4’ diameter manholes which equals 188 vertical feet. The cost is $70,160.00 which equals $373.20/VF. This is to line the entire structures. Bypass pumping will be needed for 2 manholes. They will also need access to get equipment down a few driveways. Abel Recon is the only contractor in the area approved by the manufacturer to install this. CoStars is a cooperative program run by the state. They will probably start mid to late June. Jessica feels it is a standard proposal. Jack moved to accept the proposal from Abel Recon based on the Township engineer’s recommendation. Phil seconded the motion. The motion passed unanimously.
  2. Ashbridge – Mike reported that a 6” force main runs through a manhole into the sewer. The manhole is in bad shape. They looked at alternatives and surveyed last week. They are proposing to demolish the existing manhole and piping, and install a new manhole downstream between 2 houses with larger pipes. They will have to shut down the Ashbridge pump station for a few hours. This will be within the Township easement. Public Works Department can do this work.
  3. Project Budgets – Some projects are over budget and some are under budget. After discussion the following motions were made: Ed moved to increase the budget for EGMA 1504 Reservoir Road Pump Station up to $5,000.00. Jack seconded the motion. The motion passed unanimously.; Phil moved to increase the budget for EGMA 1604 White Chimneys & Cornwallis Dr. Manhole Lining up to $5,000.00. Ed seconded the motion. The motion passed.; Ed moved to increase the budget for EGMA 1605 White Chimneys Manhole Replacement up to $8,000.00. Jack seconded the motion. The motion passed.; Phil moved to increase the budget for EGMA 1606 RCSTP NPDES Permit Renewal Application up to $4,500.00. Ed seconded the motion. The motion passed.

Capacity Requests

  1. 1420 E. Strasburg Road – The developer is Jim Brandolini. They will keep the existing house and build 2 new houses. They are requesting a total of 3 EDUs which equals 634.5 gpd. Jack moved to approve the request from Commonwealth Engineers Inc. for 3 EDUs at 1402 E. Strasburg Road. Ed seconded the motion. The motion passed.

Any Other Matter

  1. Lockwood Pump Station – Rick mentioned that the HOA has been contacted about the fence. A final walk will be done with the HOA.

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 5-9-16 draft.doc

4

Adjournment

There being no further business, Phil moved to adjourn the meeting. Ed seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:35 pm. The next meeting will be held on Monday, June 13, 2016 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2016\MA 5-9-16 draft.doc

5

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

[Stamp: FILE]

March 18, 2016

Mr. Donald Pusey
1636 Bow Tree Drive
West Chester PA 19380

Dear Mr. Pusey:

As I noted in my letter of March 2, 2016 the force main for the Reservoir Road Pump Station will have to cross the corner of your property that is next to the pond. This means the Authority will need to acquire an easement from you to install the force main.

The Authority engaged William Wood Company to conduct an appraisal and they have determined that the Just Compensation for the Temporary and Permanent Easement is $690.00. Please consider this letter as a formal offer from the Municipal Authority to acquire the easement from you for $690.00.

I have enclosed a copy of the appraisal and the easement for your review. If the offer is acceptable please contact me and we can set up a time for executing the agreement and payment of the compensation.

Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions.

Sincerely,

Louis F. Smith, Jr.
Township Manager

Enclosures

[Handwritten note:]
6-9-16
NEED CHECK FOR $690.00 PAYABLE TO DONALD PUSEY

F:\Data\Shared Data\ABC’S\Municipal Authority\Projects\Reservoir Road PS\Easement\Letter 031816.doc

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 692533
Invoice Date : 05/26/2016
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting

For Services Rendered through: 5/15/2016

Prepared revisions to the NPDES plan submission and permit application forms to address CCCD's comments; finalized and resubmitted PennDOT HOP Cycle 4 plans to address PennDOT's comments; and obtained status updates from PADEP on outstanding General Permit applications.

Phase : 11 -- Final Design

Total Phase : 11 -- Final Design Labor : 2,116.50
Expense : 0.00
Phase Total : 2,116.50

Phase : 12 -- Permitting

Total Phase : 12 -- Permitting Labor : 915.75
Expense : 0.00
Phase Total : 915.75

Amount Due This Invoice: $3,032.25

[Handwritten note in red ink:] ok RS 6-9

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1504 -- Reservoir Rd PS Design & Permitting

Invoice # : 692533

...Continued from previous page

Phase : 11 -- Final Design

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.00 115.00 230.00
Engineering Technician II 24.50 77.00 1,886.50
Labor Total: 26.50 2,116.50
Total Phase : 11 -- Final Design Labor : $2,116.50
Expense : $0.00

Phase : 12 -- Permitting

Labor

Class Hours/Units Rate Amount
Staff Engineer 1.50 90.00 135.00
Senior Enviromental Scientist 0.50 90.00 45.00
Graduate Engineer 8.25 77.00 635.25
Engineering Technician I 1.50 67.00 100.50
Labor Total: 11.75 915.75
Total Phase : 12 -- Permitting Labor : $915.75
Expense : $0.00
Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting Labor : $3,032.25
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.

Page: 2

East Goshen Municipal Authority

EGMA1504 Invoice Summary

Invoice Date 5/26/2016

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 692533
Invoice Period: 4/18/206 to 5/15/2016
Initial Authorization: $ 167,120.00 Date: 5/26/2016
Contract Amount: $ 174,120.00
Previously Invoiced: $ 166,941.50
Current Invoice: $ 3,032.25
Invoiced to Date ($): $ 169,973.75
Invoiced to Date (%): 97.62%
Remaining Budget ($): $ 4,146.25
Remaining Budget (%): 2.38%

Budget by Phase:

Phase Name: Final Design Phase 11
Phase Budget: $ 67,500.00
Previously Invoiced: $ 61,341.75
Current Invoice: $ 2,116.50
Invoiced to Date ($): $ 63,458.25
Invoiced to Date (%): 94.01%
Remaining Budget ($): $ 4,041.75
Remaining Budget (%): 5.99%

Comments: Prepared revisions to the NPDES plan submission and permit application forms to address CCCD's comments; finalized and resubmitted PennDOT HOP Cycle 4 plans to address PennDOT's comments; and obtained status updates from PADEP on outstanding General Permit applications.

East Goshen Municipal Authority

EGMA1504 Invoice Summary

Invoice Date 5/26/2016

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 692533
Invoice Period: 4/18/2016 to 5/15/2016
Initial Authorization: $ 167,120.00 Date: 5/26/2016
Contract Amount: $ 174,120.00
Previously Invoiced: $ 166,942.25
Current Invoice: $ 3,032.25
Invoiced to Date ($): $ 169,974.50
Invoiced to Date (%): 97.62%
Remaining Budget ($): $ 4,145.50
Remaining Budget (%): 2.38%

Budget by Phase:

Phase Name: Permitting Phase 12
Phase Budget: $ 29,610.50
Previously Invoiced: $ 28,590.25
Current Invoice: $ 915.75
Invoiced to Date ($): $ 29,506.00
Invoiced to Date (%): 99.65%
Remaining Budget ($): $ 104.50
Remaining Budget (%): 0.35%

Comments: Prepared revisions to the NPDES plan submission and permit application forms to address CCCD's comments; finalized and resubmitted PennDOT HOP Cycle 4 plans to address PennDOT's comments; and obtained status updates from PADEP on outstanding General Permit applications.

Reservoir Road Pump Station Design & Permitting

INVOICE SUMMARY

For Services Rendered through: 5/15/2016

Task No. Activity Contract Amount* Invoiced Effort thru 2/14/2016 Remaining Budget ($) Remaining Budget (%) Completed?
1 Concept Design $13,655.75 $13,655.75 - - Yes
2 DEP WQM Pre-App. Meeting $1,300.00 $1,300.00 - - Yes
3 Existing Conditions Survey $22,783.75 $22,783.75 - - Yes
4 Sewer Stakeout in Easements $0.00 $0.00 - - Scope eliminated
5 1636 Bow Tree Dr. Boundary Survey & Easement $4,020.00 $4,020.00 - - Yes
6 Additional Boundary Surveys & Easements $0.00 $0.00 - - Scope eliminated
7 Geotechnical Borings $4,000.00 $4,000.00 - - Yes
8 Install Permanent Survey Benchmarks $0.00 $0.00 - - Scope eliminated
9 Progress Design $29,450.00 $29,450.00 - - Yes
10 Infiltration Testing $1,800.00 $1,800.00 - - Yes
11 Final Design $67,500.00 $63,458.25 $4,041.75 6% No
12 Permitting $29,610.50 $29,506.00 $104.50 <1% No
TOTAL $174,120.00 $169,973.75 $4,146.25 2%

*After 12/14/2015 approved re-allocation of task budgets and 5/9/2016 approval of $7,00 supplement.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 692534
Invoice Date : 05/26/2016
Project : EGMA1505
Project Name : RCSTP and Pump Station O&M Manual

For Services Rendered through: 5/15/2016

Continued preparation of O&M Manual.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 174.25
Expense : 0.00
Phase Total : 174.25

Amount Due This Invoice: $174.25

Fee : 12,500.00
Prior Billings : 4,872.75
Current Billings : 174.25
Total Billings : 5,047.00

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 0.25 115.00 28.75
Project Engineer 1.50 97.00 145.50
Labor Total: 1.75 174.25
Total Phase : **** -- Professional Services Labor : $174.25
Expense : $0.00
Total Project : EGMA1505 -- RCSTP and Pump Station O&M Manual Labor : $174.25
Expense : $0.00

[Handwritten note in red ink:] ok RS 6-9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1505 Invoice Summary

Invoice Date 05/26/2016

Project: EGMA1505
Pennoni Job No.: RCSTP & Pump Station O&M Manual
Invoice No: 692534
Invoice Period: 4/18/2016 to 5/15/2016
Initial Authorization: $ 12,500.00 Date: 5/26/2016
Contract Amount: $ 12,500.00
Previously Invoiced: $ 4,872.75
Current Invoice: $ 174.25
Invoiced to Date ($): $ 5,047.00
Invoiced to Date (%): 40%
Remaining Budget ($): $ 7,453.00
Remaining Budget (%): 60%

Budget by Phase:

Phase Name: RCSTP & Pump Station O&M Manual
Phase Budget: $ 12,500.00
Previously Invoiced: $ 4,872.75
Current Invoice: $ 174.25
Invoiced to Date ($): $ 5,047.00
Invoiced to Date (%): 40%
Remaining Budget ($): $ 7,453.00
Remaining Budget (%): 60%

Comments: Continued preparation of O&M Manual.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 692535
Invoice Date : 05/26/2016
Project : EGMA1601
Project Name : 2016 General Services

For Services Rendered through: 5/15/2016

Vendor coordination for sizing and cost of bypass pumps for RCSTP and pump stations; prepared May Engineer's Report; prepared for and attended May MA meeting; and provided budgetary costs for cured-in-place pipe lining to PW Director.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor : 948.75
Expense : 0.00
Phase Total : 948.75

Amount Due This Invoice: $948.75

Fee : 12,300.00
Prior Billings : 3,204.50
Current Billings : 948.75
Total Billings : 4,153.25

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 8.25 115.00 948.75
Labor Total: 8.25 948.75
Total Phase : **** -- Professional Services Labor : $948.75
Expense : $0.00
Total Project : EGMA1601 -- 2016 General Services Labor : $948.75
Expense : $0.00

ok FS 6-9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1601 Invoice Summary

Invoice Date 05/26/2016

Project: EGMA1601
Pennoni Job No.: 2016 General Services
Invoice No: 692535
Invoice Period: 4/18/2016 to 5/15/2016
Date: 5/26/2016

Initial Authorization: $ 12,300.00
Contract Amount: $ 12,300.00
Previously Invoiced: $ 3,204.50
Current Invoice: $ 948.75
Invoiced to Date ($): $ 4,153.25
Invoiced to Date (%): 34%
Remaining Budget ($): $ 8,146.75
Remaining Budget (%): 66%

Budget by Phase:

Phase Name: 2016 General Services
Phase Budget: $ 12,300.00
Previously Invoiced: $ 3,204.50
Current Invoice: $ 948.75
Invoiced to Date ($): $ 4,153.25
Invoiced to Date (%): 34%
Remaining Budget ($): $ 8,146.75
Remaining Budget (%): 66%

Comments: Vendor coordination for sizing and cost of bypass pumps fro RCSTP and pump stations; prepared May Engineer's Report; prepared for and attended May MA meeting; and provided budgetary costs for cured-in-place pipe lining to PW Director.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 692536
Invoice Date : 05/26/2016
Project : EGMA1602
Project Name : 2016 Semi-Annual I&I Reports

For Services Rendered through: 5/15/2016

Analyzed flow data from portable meters for March-April timeframe; prepared summary documentation and recommendations; and initiated preparation of semi-annual I&I Report.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor : 1,510.50
Expense : 0.00
Phase Total : 1,510.50

Amount Due This Invoice: $1,510.50

Fee : 11,200.00
Prior Billings : 2,209.50
Current Billings : 1,510.50
Total Billings : 3,720.00

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 1.25 115.00 143.75
Graduate Engineer 17.75 77.00 1,366.75
Labor Total: 19.00 1,510.50
Total Phase : **** -- Professional Services Labor : $1,510.50
Expense : $0.00
Total Project : EGMA1602 -- 2016 Semi-Annual I&I Reports Labor : $1,510.50
Expense : $0.00

ok FS 6-9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1602 Invoice Summary

Invoice Date
5/26/2016

Project: EGMA1602
Pennoni Job No.: 2016 Semi-Annual I&I Reports
Invoice No: 692536
Invoice Period: 2/15/2016 to 5/15/2016
Date: 5/26/2016

Initial Authorization: $ 11,200.00
Contract Amount: $ 11,200.00
Previously Invoiced: $ 2,029.50
Current Invoice: $ 1,510.50
Invoiced to Date ($): $ 3,540.00
Invoiced to Date (%): 32%
Remaining Budget ($): $ 7,660.00
Remaining Budget (%): 68%

Budget by Phase:

Phase Name: 2016 Semi-Annual I&I Reports
Phase Budget: $ 11,200.00
Previously Invoiced: $ 2,029.50
Current Invoice: $ 1,510.50
Invoiced to Date ($): $ 3,540.00
Invoiced to Date (%): 32%
Remaining Budget ($): $ 7,660.00
Remaining Budget (%): 68%

Comments: Analyzed flow data from portable meters for March-April timeframe; prepared summary documentation and recommendations; and initiated preparation of semi-annual I&I Report.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 692537
Invoice Date : 05/26/2016
Project : EGMA1604
Project Name : White Chimneys MH Lining Bid Doc

For Services Rendered through: 5/15/2016

Set up and attended pre-proposal field meeting with Abel Recon and Township staff; updated exhibits and project scope based on field measurements and observations from pre-proposal meeting; reviewed Abel Recon's proposal and discussed project approach and questions with them.

Phase : **** -- Design Phase

Total Phase : **** -- Design Phase

Labor : 1,287.00
Expense : 0.00
Phase Total : 1,287.00

Amount Due This Invoice: $1,287.00

Fee : 12,400.00
Prior Billings : 5,046.50
Current Billings : 1,287.00
Total Billings : 6,333.50

Phase : **** -- Design Phase

Labor

Class Hours/Units Rate Amount
Authority Engineer 7.25 115.00 833.75
Project Engineer 1.25 97.00 121.25
Senior Engineering Technician 3.00 85.00 255.00
Graduate Engineer 1.00 77.00 77.00
Labor Total: 12.50 1,287.00
Total Phase : **** -- Design Phase Labor : $1,287.00
Expense : $0.00
Total Project : EGMA1604 -- White Chimneys MH Lining Bid Doc Labor : $1,287.00
Expense : $0.00

ok FS 6-9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1604 Invoice Summary

Invoice Date 05/26/2016

Project: EGMA1604
Pennoni Job No.: White Chimneys MH Lining Bid Doc
Invoice No: 692537
Invoice Period: 4/18/2016 to 5/15/2016
Date: 5/26/2016

Initial Authorization: $ 4,400.00
Contract Amount: $ 12,400.00
Previously Invoiced: $ 5,046.50
Current Invoice: $ 1,287.00
Invoiced to Date ($): $ 6,333.50
Invoiced to Date (%): 51%
Remaining Budget ($): $ 6,066.50
Remaining Budget (%): 49%

Budget by Phase:

Phase Name: White Chimneys MH Lining Bid Doc
Phase Budget: $ 12,400.00
Previously Invoiced: $ 5,046.50
Current Invoice: $ 1,287.00
Invoiced to Date ($): $ 6,333.50
Invoiced to Date (%): 51%
Remaining Budget ($): $ 6,066.50
Remaining Budget (%): 49%

Comments: Set up and attended pre-proposal field meeting with Abel Recon and Township staff; updated exhibits and project scope based on field measurements and observations from pre-proposal meeting; reviewed Abel Recon's proposal and discussed project approach and questions with them.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 692538
Invoice Date : 05/26/2016
Project : EGMA1605
Project Name : White Chimneys MH Replacement

For Services Rendered through: 5/15/2016

Attended field meeting with Township staff to strategize manhole replacement approach; performed topographic and existing conditions field survey; and prepared existing conditions and design plan with details.

Phase : **** -- Design Phase

Total Phase : **** -- Design Phase

Labor : 4,595.75
Expense : 0.00
Phase Total : 4,595.75

Amount Due This Invoice: $4,595.75

Fee : 8,000.00
Prior Billings : 0.00
Current Billings : 4,595.75
Total Billings : 4,595.75

Phase : **** -- Design Phase

Labor

Class Hours/Units Rate Amount
2-Person Survey Crew 8.00 156.00 1,248.00
Authority Engineer 5.50 115.00 632.50
Principal Surveyor 4.50 110.00 495.00
Project Engineer 7.75 97.00 751.75
Senior Survey Technician 1.00 86.00 86.00
Engineering Technician II 15.00 77.00 1,155.00
Survey Technician 3.25 70.00 227.50
Labor Total: 45.00 4,595.75
Total Phase : **** -- Design Phase Labor : $4,595.75
Expense : $0.00
Total Project : EGMA1605 -- White Chimneys MH Replacement Labor : $4,595.75
Expense : $0.00

ok FS 6-9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1605 Invoice Summary

Invoice Date 05/26/2016

Project: EGMA1605
Pennoni Job No.: White Chimneys MH Replacement
Invoice No: 692538
Invoice Period: NTP to 5/15/2016
Date: 5/26/2016

Initial Authorization: $ 8,000.00
Contract Amount: $ 8,000.00
Previously Invoiced: $ -
Current Invoice: $ 4,595.75
Invoiced to Date ($): $ 4,595.75
Invoiced to Date (%): 57%
Remaining Budget ($): $ 3,404.25
Remaining Budget (%): 43%

Budget by Phase:

Phase Name: White Chimneys MH Replacement
Phase Budget: $ 8,000.00
Previously Invoiced: $ -
Current Invoice: $ 4,595.75
Invoiced to Date ($): $ 4,595.75
Invoiced to Date (%): 57%
Remaining Budget ($): $ 3,404.25
Remaining Budget (%): 43%

Comments: Attended field meeting with Township staff to strategize manhole replacement approach; performed topographic and existing conditions field survey; and prepared existing conditions and design plan with details.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 692539
Invoice Date : 05/26/2016
Project : EGMA1606
Project Name : Ridley Creek STP Permit Renewal

For Services Rendered through: 5/15/2016

Initiated preparation of permit renewal application.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor : 1,487.00
Expense : 0.00
Phase Total : 1,487.00

Amount Due This Invoice: $1,487.00

Fee : 4,500.00
Prior Billings : 0.00
Current Billings : 1,487.00
Total Billings : 1,487.00

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 2.00 115.00 230.00
Project Engineer 1.25 97.00 121.25
Graduate Engineer 14.75 77.00 1,135.75
Labor Total: 18.00 1,487.00
Total Phase : **** -- Professional Services Labor : $1,487.00
Expense : $0.00
Total Project : EGMA1606 -- Ridley Creek STP Permit Renewal Labor : $1,487.00
Expense : $0.00

ok FS 6-9

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1606 Invoice Summary

Invoice Date 05/26/2016

Project: EGMA1606
Pennoni Job No.: Ridley Creek STP Permit Renewal
Invoice No: 692539
Invoice Period: NTP to 5/15/2016
Date: 5/26/2016

Initial Authorization: $ 4,500.00
Contract Amount: $ 8,000.00
Previously Invoiced: $ -
Current Invoice: $ 1,487.00
Invoiced to Date ($): $ 1,487.00
Invoiced to Date (%): 19%
Remaining Budget ($): $ 6,513.00
Remaining Budget (%): 81%

Budget by Phase:

Phase Name: Ridley Creek STP Permit Renewal
Phase Budget: $ 8,000.00
Previously Invoiced: $ -
Current Invoice: $ 1,487.00
Invoiced to Date ($): $ 1,487.00
Invoiced to Date (%): 19%
Remaining Budget ($): $ 6,513.00
Remaining Budget (%): 81%

Comments: Initiated preparation of permit renewal application.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

RS 5/11/16

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
05/06/2016
Client No: 6604-001R
Invoice No. 145866

General Authority Services

Fees

Date / Timekeeper Description Hours
04/07/2016
PMM
Emails to/from R Smith regarding West Goshen. 0.20
04/11/2016
EVG
Analysis of the COSTARS program regarding caps on installation secondary to supply contracts 1.40
04/11/2016
PMM
Email from R Smith regarding COSTARS issue; Review and analyze meeting packet in preparation for Authority meeting; Attend Authority meeting. 2.20
04/13/2016
EVG
Analysis of the terms of lifting the installation cap for COSTARS contracts 0.50
04/14/2016
EVG
Final preparation of memorandum to client regarding changes to the COSTARS program and the permissible ancillary services 0.50
04/14/2016
PMM
Email to R Smith regarding COSTARS and installation services. 0.20
04/15/2016
EVG
Email from and to R. Smith regarding prevailing wage requirements for ancillary installation activities on COSTARS contracts 0.40
For Current Services Rendered 5.40 1,080.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Elizabeth V Gavin 2.80 $200.00 $560.00
Patrick M. McKenna 2.60 200.00 520.00
Total Current Charges 1,080.00

THIS INVOICE HAS BEEN PAID

Balance Due $1,080.00

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA May Financial Reports
Date: June 6, 2016

In May, the Municipal Authority recorded $109 in revenues (interest) and $12,052 in expenses ($4,342 for general engineering services and $6,630 for Reservoir Road Pump Station engineering), for a negative variance of $11,943. As of May 31st, the fund balance was $1,417,288, of which $1,382,001 is in the main construction account.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA

Municipal Authority

May 2016

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 1,429,231.38
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 1,500.00 108.59 537.33
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 1,500.00 108.59 537.33
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00
TOTAL EXPENSES 0.00 0.00 0.00
RCSTP NET RESULT 1,500.00 108.59 537.33

U:\bmccool\2016\Municipal Authority\2016 - 05 - Municipal Authority Report.xlsx

Page 1 of 3

06/06/2016

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA

Municipal Authority

May 2016

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS 07341 1000 10.00 0.18 2.25
C.C. TAPPING FEES 07364 1100 4,000.00 0.00 0.00
R.C.TAPPING FEES 07364 1110 4,000.00 0.00 12,152.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 845.64
MISCELLANEOUS REVENUE 07380 1000 0.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 93,832.00 0.00 25,000.00
TOTAL REVENUE 101,842.00 0.18 38,423.25
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 0.00 0.00 7,705.49
MISCELLANEOUS EXPENSE 07424 3000 3,000.00 0.00 1,641.62
MUNIC.AUTH.-AUDITING 07424 3110 9,500.00 0.00 7,500.00
ENGINEERING SERVICES 07424 3130 38,500.00 4,342.25 27,677.50
LEGAL SERVICES 07424 3140 9,000.00 1,080.00 4,023.50
M.C.-DVRFA-DEBT SERVICE 07471 1000 24,920.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 3,172.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 0.00 0.00 0.00
TOTAL EXPENSES 88,092.00 5,422.25 48,548.11
OPERATING NET RESULT 13,750.00 (5,422.07) (10,124.86)

U:\bmccool\2016\Municipal Authority\2016 - 05 - Municipal Authority Report.xlsx

Page 2 of 3

06/06/2016

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE
WEST CHESTER, PA

Municipal Authority

May 2016

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07393 1001 0.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 0.00 0.00 0.00
TOTAL REVENUE 0.00 0.00 0.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 0.00 0.00 0.00
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 0.00 0.00 0.00
MANHOLE COVER REPLACEMENTS 07424 7405 0.00 0.00 0.00
C.C. CAPITAL - COLLECTION 07424 7420 0.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 0.00
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 0.00 0.00 0.00
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 0.00
HERSHEY MILL STATION - ENGINEER 07426 1000 0.00 0.00 0.00
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 0.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 0.00 0.00 0.00
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 0.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 25,000.00 6,629.75 34,400.50
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
ASBSTOS CONCRETE ENGINEERING 07429 3130 0.00 0.00 0.00
DIVERSION PROJ.- LEGAL 07429 3166 0.00 0.00 0.00
TOTAL EXPENSES 25,000.00 6,629.75 34,400.50
CAPITAL NET RESULT (25,000.00) (6,629.75) (34,400.50)
MUNICIPAL AUTHORITY ENDING FUND BALANCE 1,417,288.15

U:\bmccool\2016\Municipal Authority\2016 - 05 - Municipal Authority Report.xlsx

Page 3 of 3

06/06/2016

East Goshen Township General Ledger

Report Date 06/06/16 GL Transaction Details PAGE 1

MGRP18 run by BRIAN 3 : 52 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1601 JE 51240 0.43 02/01/16 INTEREST INTEREST EARNED JANUARY 2016 07 FUND
1601 0.00 0.43 -0.43
1602 51651 0.51 03/01/16 INTEREST INTEREST EARNED FEBRUARY 2016 07 FUND
1602 0.00 0.51 -0.94
1603 52095 0.51 04/04/16 INTEREST INTEREST EARNED MARCH 2016 07 FUND
1603 0.00 0.51 -1.45
1604 52568 0.62 05/03/16 INTEREST INTEREST EARNED APRIL 2016 07 FUND
1604 0.00 0.62 -2.07
1605 52983 0.18 06/03/16 INTEREST INTEREST EARNED MAY 2016 07 FUND
1605 0.00 0.18 -2.25
07341-1000 **** *** ***** 0.00 2.25 -2.25
07341-1020 INTEREST EARNED - CONSTRUCTION 0.00
1601 51240 110.59 02/01/16 INTEREST INTEREST EARNED JANUARY 2016 07 FUND
1601 0.00 110.59 -110.59
1602 51651 103.56 03/01/16 INTEREST INTEREST EARNED FEBRUARY 2016 07 FUND
1602 0.00 103.56 -214.15
1603 52095 109.26 04/04/16 INTEREST INTEREST EARNED MARCH 2016 07 FUND

East Goshen Township General Ledger

Report Date 06/06/16 GL Transaction Details PAGE 2

MGRP18 run by BRIAN 3 : 52 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1603 0.00 109.26 -323.41
1604 52568 105.33 05/03/16 INTEREST INTEREST EARNED APRIL 2016 07 FUND
1604 0.00 105.33 -428.74
1605 52983 108.59 06/03/16 INTEREST INTEREST EARNED MAY 2016 07 FUND
1605 0.00 108.59 -537.33
07341-1020 **** *** ***** 0.00 537.33 -537.33
07364-1110 R.C.TAPPING FEES 0.00
1601 CR 51204 5,004.00 01/28/16 1247 7875 1 SUNNY RIDGE FARMS LLC
1601 0.00 5,004.00 -5,004.00
1602 RE 51557 7,148.00 02/23/16 51557 1 TAP IN FEE-957 CORNWALLIS DR
1602 0.00 7,148.00 -12,152.00
07364-1110 **** *** ***** 0.00 12,152.00 -12,152.00
07364-1130 CONNECTION FEES - SEWER 0.00
CR 51318 423.00 02/05/16 804 9354 1 GEORGE SMITH & CHRISTINA CONLE
51322 423.00 02/05/16 344 9356 1 JACOBS, ROBERT & CHERYL
51357 423.00 02/08/16 2435 9355 1 STOFFLET, MICHAEL
JE 51319 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51323 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51358 141.12 02/08/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1602 423.36 1,269.00 -845.64
07364-1130 **** *** ***** 423.36 1,269.00 -845.64

East Goshen Township General Ledger

Report Date 06/06/16 GL Transaction Details PAGE 3

MGRP18 run by BRIAN 3 : 52 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07380-1000 MISCELLANEOUS REVENUE 0.00
51319 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51323 141.12 02/05/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
51358 141.12 02/08/16 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1602 0.00 423.36 -423.36
07380-1000 **** *** ***** 0.00 423.36 -423.36
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1603 52022 25,000.00 03/28/16 DEPOSIT DEPOSIT TO MUNICIPAL ACCT.
1603 0.00 25,000.00 -25,000.00
07392-0500 **** *** ***** 0.00 25,000.00 -25,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
CD 51990 7,705.49 03/24/16 3013 425 EAST GOSHEN TOWNSHIP - GENERAL
Q1 2016 REIMBURSEMENT FROM MUN.A
1603 7,705.49 0.00 7,705.49
07424-1400 **** *** ***** 7,705.49 0.00 7,705.49
07424-3000 MISCELLANEOUS EXPENSE 0.00
1601 50894 978.00 01/04/16 3004 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2016 ACTIVE MEMBERSHIP DUES
51002 163.62 01/18/16 3005 2967 SAFEGUARD
CHECK ORDER FEE
51028 500.00 01/14/16 3006 2737 COMMONWEALTH OF PA
NPDES PERMITS -CHAP.92A 2016
PERMIT# PA0050504
1601 1,641.62 0.00 1,641.62
07424-3000 **** *** ***** 1,641.62 0.00 1,641.62
07424-3110 MUNIC.AUTH.-AUDITING 0.00

East Goshen Township General Ledger

Report Date 06/06/16 GL Transaction Details PAGE 4

MGRP18 run by BRIAN 3 : 52 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1604 CD 52313 7,500.00 04/18/16 3015 808 MAILLIE FALCONIERO & CO.
FINANCIAL STMT. EXAMINATION 2015
1604 7,500.00 0.00 7,500.00
07424-3110 **** *** ***** 7,500.00 0.00 7,500.00
07424-3130 ENGINEERING SERVICES 0.00
1602 51394 5,905.25 02/10/16 3008 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/17/16 RCSTP & PU
STATION O&M MANUAL
51527 1,063.75 02/23/16 3010 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/13/16 2015 GEN.SER
1602 6,969.00 0.00 6,969.00
1603 51813 9,874.50 03/15/16 3012 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/14/16 RCSTP PS O
1603 9,874.50 0.00 16,843.50
1604 52227 6,491.75 04/12/16 3014 1052 PENNONI ASSOCIATES INC.
SERV.THRU 3/20/16 WHITE CHIMNEY
1604 6,491.75 0.00 23,335.25
1605 52696 4,342.25 05/10/16 3017 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 4/17/16 - RCSTP & P
1605 4,342.25 0.00 27,677.50
07424-3130 **** *** ***** 27,677.50 0.00 27,677.50
07424-3140 LEGAL SERVICES 0.00
1601 51149 400.00 12/17/15 3007 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES 12/14/15 - GEN.AU
1601 400.00 0.00 400.00
1602 51503 480.00 02/19/16 3009 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 1/11-1/29/16 GEN.A

East Goshen Township General Ledger

Report Date 06/06/16 GL Transaction Details PAGE 5

MGRP18 run by BRIAN 3 : 52 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1602 480.00 0.00 880.00
1603 51813 1,523.50 03/15/16 3011 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE FEB.2016 - GEN. AU
1603 1,523.50 0.00 2,403.50
1604 52428 540.00 04/21/16 3016 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE MARCH 2016 GEN.AUT
1604 540.00 0.00 2,943.50
1605 52806 1,080.00 05/20/16 3019 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 4/7-4/15/16 GEN.AU
1605 1,080.00 0.00 4,023.50
07424-3140 **** *** ***** 4,023.50 0.00 4,023.50
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1602 51395 2,565.50 02/10/16 103 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 1/17/16 RESERV.RD.P
51528 16,747.75 02/23/16 104 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 12/13/15 RESERV.RD
1602 19,313.25 0.00 19,313.25
1603 51812 1,934.75 03/15/16 105 1052 PENNONI ASSOCIATES INC.
SERV. THRU 2/14/16 RESERV.RD PS
PENNDOT HOP
52048 1,000.00 03/30/16 106 1496 WILLIAM WOOD CO.
SEWER EASEMENT -1636 BOW TREE DR
1603 2,934.75 0.00 22,248.00
1604 52173 500.00 04/07/16 107 3110 COMMONWEALTH OF PENNSYLVANIA
WQM PERMIT APPLICATION
52226 3,972.75 04/12/16 108 1052 PENNONI ASSOCIATES INC.
SERV. THRU 3/20/16 PH.11 RESERV
PS DESIGN
52469 1,050.00 04/25/16 109 3671 PENNDOT
PERMIT - HOP APPLICATION #100373

East Goshen Township General Ledger

Report Date 06/06/16 GL Transaction Details PAGE 6

MGRP18 run by BRIAN 3 : 52 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1604 5,522.75 0.00 27,770.75
1605 52695 6,629.75 05/10/16 111 1052 PENNONI ASSOCIATES INC.
SERV.THRU 4/17/16 RESERVOIR RD
1605 6,629.75 0.00 34,400.50
07428-1000 **** *** ***** 34,400.50 0.00 34,400.50
Grand Total 83,371.97 39,383.94 43,988.03

DCED-CLGS-04

151328

ANNUAL REPORT OF MUNICIPAL AUTHORITIES 2015

Commonwealth of Pennsylvania
Department of Community and Economic Development
Governor's Center for Local Government Services
4th Floor Commonwealth Keystone Building
Harrisburg, Pennsylvania 17120-0225
1-888-223-6837
FAX # 717-783-1402

FACE SHEET

Field Current Information Corrected Information
Authority Name EAST GOSHEN MUNICIPAL AUTHORITY
Authority Address 1580 PAOLI PIKE
WEST CHESTER, PA 19380-6199
Telephone Number (610) 692-7171
Fax Number 6106928950
Name of Contact Person LOUIS F. SMITH, JR.
E-Mail Address rsmith@eastgoshen.org
Title TOWNSHIP MANAGER

Filing Status
1 Active   X  
2 Inactive ______
5 Terminated ______

Authority Type
11 Local Government Facilities

Date Authority Organized (year): 1967
Fiscal Year Ends (month/day): 12/31

Date Authority Terminates (year): 2048
Number of Employees
(full time equivalent): 0
(part time equivalent): 0

SIGNATURE __________________________________________________
TITLE __________________________________________________ PHONE (_______) _____________________

(SEE REVERSE SIDE FOR GEOGRAPHICAL AREAS SERVED BY AUTHORITY)

151328

Geographical Areas Served

Mun Code Municipal Name County
150395 EAST GOSHEN TWP CHESTER
150575 EAST WHITELAND TWP CHESTER
151895 WEST GOSHEN TWP CHESTER
152165 WESTTOWN TWP CHESTER
152195 WILLISTOWN TWP CHESTER

151328

FINANCING AUTHORITIES BALANCE SHEET
FISCAL YEAR ENDING DEC 2015

ASSETS
CURRENT ASSETS
Cash 1,461,277
Investments
Accounts receivable
Other current assets
TOTAL CURRENT ASSETS 1,461,277
RESTRICTED ASSETS/TRUST FUNDS
LEASE RENTAL PAYMENTS RECEIVABLE 9,260,809
DEFERRED CHARGES
TOTAL ASSETS 10,722,086
LIABILITIES AND FUND EQUITY
CURRENT LIABILITIES
Accounts payable 164
Accrued interest payable 6,378
Current portion of long-term debt 506,000
Other current liabilities
TOTAL CURRENT LIABILITIES 512,542
LONG-TERM DEBT - less current portion 9,671,000
FUND BALANCE
Reserved
Unreserved 538,544
TOTAL FUND BALANCE 538,544
TOTAL LIABILITIES & FUND BALANCE 10,722,086

151328

SEWER
FINANCING AUTHORITIES
STATEMENT OF INCOME AND EXPENDITURES

OPERATING REVENUES
Interest income 1,505
Lease rental payments 878,890
Other operating revenues 82,750
TOTAL OPERATING REVENUES 963,145
OPERATING EXPENSES
Administration - Salaries
Administration - Other Costs 32,303
Other operating expenses 74,302
TOTAL OPERATING EXPENSES 106,605
OPERATING INCOME (LOSS) 856,540
NONOPERATING REVENUES
Capital Grants - State
Capital Grants - Federal
Proceeds of borrowings
Other nonoperating revenues
TOTAL NONOPERATING REVENUES
NONOPERATING EXPENSES
Debt service payments (interest only)
Capital advances to lessees
Other nonoperating expenses 445,000
TOTAL NONOPERATING EXPENSES 445,000
TOTAL NONOPERATING REVENUE (LOSS) (445,000)
NET INCOME BEFORE EXTRAORDINARY ITEMS 411,540
EXTRAORDINARY GAIN (LOSS)
NET INCOME 411,540
FUND BALANCE (beginning of year) 127,004
FUND BALANCE (end of year) 538,544

151328

DEBT STATEMENT

OUTSTANDING BONDS AND NOTES

Listed below are all currently outstanding bond and note issues according to our files, excluding bond issues redeemed or refunded and defeased. Please show the principal payments and make any other necessary corrections and additions.

Type Purp Bond (B)
Note (N)
Issue Date
(mm/yy)
Original Amount of Issue Outstanding Beginning of Year Principal Paid This Year Outstanding at Year End Final Year
11 N 01/98 1,340,000 365,000 83,000 282,000 2018
11 N 12/08 9,500,000 7,888,000 308,000 7,580,000 2032
11 N 10/13 2,500,000 2,409,000 94,000 2,315,000 2033
Total bonds and notes outstanding 10,177,000
Capitalized lease obligations
Other debt
TOTAL OUTSTANDING DEBT 10,177,000
Minus assets held in debt service funds, bond reserve funds and bond redemption funds
Minus lease rental payments receivable 9,260,809
NET DEBT 916,191

EAST GOSHEN MUNICIPAL AUTHORITY

ANNUAL FINANCIAL REPORT

Year Ended December 31, 2015

Maillie®
Expertise Beyond The Numbers®
Certified Public Accountants and Business Consultants

INTRODUCTORY SECTION

EAST GOSHEN MUNICIPAL AUTHORITY

TABLE OF CONTENTS
YEAR ENDED DECEMBER 31, 2015

Section Page
Introductory Section
    Table of Contents 1
Financial Section
    Independent Auditors' Report 2
    Management's Discussion and Analysis (Unaudited) 4
    Basic Financial Statements
        Statement of Net Position 7
        Statement of Revenues, Expenses and Changes in Net Position 8
        Statement of Cash Flows 9
        Notes to the Basic Financial Statements 10

- 1 -

FINANCIAL SECTION

Maillie®
Expertise Beyond The Numbers®

PO Box 680, Oaks, PA 19456-0680 | 610.935.1420 | Fax: 610.935.1632
624 Willowbrook Lane, West Chester, PA 19382 | 610.696.4353 | Fax: 610.430.8811
Maillie LLP | www.maillie.com

Independent Auditors' Report

To the Members of the Board
East Goshen Municipal Authority
West Chester, Pennsylvania

We have audited the accompanying financial statements of the East Goshen Municipal Authority (a component unit of East Goshen Township), which comprise the statement of net position as of December 31, 2015, and the related statements of revenues, expenses and changes in net position and cash flows for the year then ended and the related notes to the financial statements.

Management's Responsibility for the Financial Statements

The East Goshen Municipal Authority's management is responsible for the preparation and fair presentation of these financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error.

Auditors' Responsibility

Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditors' judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

- 2 -

Certified Public Accountants and Business Consultants

To the Members of the Board
East Goshen Municipal Authority
West Chester, Pennsylvania

Opinion

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of the East Goshen Municipal Authority as of December 31, 2015, and the changes in its financial position and its cash flows for the year then ended in accordance with accounting principles generally accepted in the United States of America (GAAP).

Other Matters

Required Supplementary Information

Accounting principles generally accepted in the United States of America require that management's discussion and analysis on pages 4 through 6 be presented to supplement the basic financial statements. Such information, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board, who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. We have applied certain limited procedures to the required supplementary information in accordance with auditing standards generally accepted in the United States of America, which consisted of inquiries of management about the methods of preparing the information and comparing the information for consistency with management's responses to our inquiries, the basic financial statements and other knowledge we obtained during our audit of the basic financial statements. We do not express an opinion or provide any assurance on the information because the limited procedures do not provide us with evidence sufficient to express an opinion or provide any assurance.

Maillie LLP
West Chester, Pennsylvania
May 16, 2016

- 3 -

EAST GOSHEN MUNICIPAL AUTHORITY

MANAGEMENT'S DISCUSSION AND ANALYSIS (Unaudited)
YEAR ENDED DECEMBER 31, 2015

Our discussion and analysis of the East Goshen Municipal Authority's (the "Authority") financial performance provides an overview of the Authority's financial activities for the fiscal year ended December 31, 2015. Please read it in conjunction with the Authority's financial statements, which begin with the statement of net position.

FINANCIAL HIGHLIGHTS

Cash represents 14% of the Authority's total assets, and the net investment in lease accounts for 86% of the total assets.

The Authority has $10,177,000 in outstanding debt compared to $10,662,000 last year. The Series of 1998 debt matures annually through 2018. The Series of 2008 matures annually through 2032. The Series of 2013 debt matures annually through 2033.

The total assets of the Authority exceeded its liabilities by $538,544 (net position).

During the year ended December 31, 2015, total revenues of the Authority were $963,145, and total expenses and transfers, net, were $551,605. This resulted in an increase in net position for the year of $411,540.

Included in expenses for 2015 was $445,000 of net transfers to East Goshen Township. This included funds expended for payments to West Goshen Township for sewage treatment and other operating expenses.

The following two tables summarize the Authority's net position and changes in net position.

Table 1 - Net Position

2015 2014
ASSETS
    Cash $ 1,461,277 $ 1,589,176
    Net investment in lease 9,260,809 9,208,768
        TOTAL ASSETS $ 10,722,086 $ 10,797,944
LIABILITIES AND NET POSITION
LIABILITIES
    Accounts payable $ 6,542 $ 8,940
    Guaranteed notes payable 10,177,000 10,662,000
        TOTAL LIABILITIES 10,183,542 10,670,940
NET POSITION 538,544 127,004
        TOTAL LIABILITIES AND NET POSITION $ 10,722,086 $ 10,797,944

- 4 -

EAST GOSHEN MUNICIPAL AUTHORITY

MANAGEMENT'S DISCUSSION AND ANALYSIS (Unaudited)
YEAR ENDED DECEMBER 31, 2015

Table 2 - Change in Net Position

2015 2014
REVENUES $ 963,145 $ 1,005,799
EXPENSES 551,605 562,423
CHANGE IN NET POSITION 411,540 443,376
NET POSITION AT BEGINNING OF YEAR 127,004 (316,372)
NET POSITION AT END OF YEAR $ 538,544 $ 127,004

OVERVIEW OF THE FINANCIAL STATEMENTS

The Authority's annual financial report consists of several sections. Taken together, they provide a comprehensive financial look at the Authority. The components of the report include the independent auditors' report, management's discussion and analysis, financial statements and notes to the basic financial statements.

The independent auditors' report briefly describes the audit engagement and also renders an opinion as to the material components of the Authority's financial statements.

The Management's Discussion and Analysis (MD&A), prepared by the Township staff, provides a narrative introduction and overview that users of the financial statements need to interpret the basic financial statements. The MD&A also provides analysis of some key data that is presented in the basic financial statements. It also addresses any other currently known facts, decisions, or conditions that are expected to have a significant effect on financial position or results of operations.

The basic financial statements include the statement of net position, statement of revenues, expenses and changes in net position, statement of cash flows and the notes to the basic financial statements.

  • The statement of net position shows the financial condition of the Authority at the end of the fiscal period or a specific snapshot in time.
  • The statement of revenues, expenses and changes in net position measures the results of operations of the Authority during the fiscal period.
  • The statement of cash flows measures the resources provided during the fiscal period and the uses to which they are put.
  • The notes to the basic financial statements provide additional disclosures required by governmental accounting standards and provide information to assist the reader in understanding the Authority's financial condition.

- 5 -

EAST GOSHEN MUNICIPAL AUTHORITY

MANAGEMENT'S DISCUSSION AND ANALYSIS (Unaudited)
YEAR ENDED DECEMBER 31, 2015

REPORTING

East Goshen Municipal Authority was established in 1967 to finance the construction of the Township's sewage collection and treatment facilities. A five-member board, appointed by the Township's Board of Supervisors, governs the Authority. Although legally separate, the Authority is considered a component unit of the Township because the Township is financially accountable for it. The major function of the Authority is to provide financing for capital construction, expansion and upgrades to the Township's sewage collection and treatment facilities. The Authority owns one sewage treatment plant, four pumping stations and 86 miles of sewer lines. The Township has the responsibility for daily operations through a leaseback arrangement with the Authority. One sewage treatment plant, the Lockwood Plant, was taken off-line in 2012, and capital improvements largely completed by the end of 2013 resulted in the closure of two pump stations, with the flows diverted to the Township's remaining sewage treatment plant.

Since 1979, the Authority has connected approximately 700 Equivalent Dwelling Units (EDUs) to the Township sewer system. Since the inception of the Authority, developers have connected roughly 1,700 EDUs to the system. Currently all of the business and commercial establishments in the Township are connected to either the public sewer system or to a community sewer system that serves Hershey's Mill Village. (Note: The Green Hill Sewer Association provides sewer service to the 1,720 dwelling units, Village Square Shopping Center and Wellington Hall life care facility, all of which are located within Hershey's Mill Village.) Of the 8,000 households in the Township, only 526 households (7%) utilize on-lot systems.

The Authority funded the construction costs for improvements to serve the homes connected by the Authority through a combination of tapping fees paid by property owners at the time of connection, a federal grant and debt incurred by the Authority.

REQUESTS FOR INFORMATION

This financial report is designed to provide our citizens, taxpayers, customers, investors and creditors with a general overview of the Authority's finances and to show the Authority's accountability for the funds it receives and disburses. If you have questions about this report or need additional information, please contact the Director of Finance at East Goshen Township, 1580 Paoli Pike, West Chester, PA 19380.

- 6 -

EAST GOSHEN MUNICIPAL AUTHORITY

STATEMENT OF NET POSITION
DECEMBER 31, 2015

ASSETS
CURRENT ASSETS
    Cash and cash equivalents $ 1,461,277
NONCURRENT ASSETS
    Net investment in lease 9,260,809
        TOTAL ASSETS $ 10,722,086
LIABILITIES AND NET POSITION
CURRENT LIABILITIES
    Accounts payable $ 164
    Accrued interest payable 6,378
    Current portion of guaranteed notes payable 506,000
        TOTAL CURRENT LIABILITIES 512,542
GUARANTEED NOTES PAYABLE, less current portion 9,671,000
        TOTAL LIABILITIES 10,183,542
NET POSITION
    Unrestricted 538,544
        TOTAL LIABILITIES AND NET POSITION $ 10,722,086

See accompanying notes to the basic financial statements.

- 7 -

EAST GOSHEN MUNICIPAL AUTHORITY

STATEMENT OF REVENUES, EXPENSES AND CHANGES IN NET POSITION
YEAR ENDED DECEMBER 31, 2015

OPERATING REVENUES
    Lease rental collections $ 878,890
OPERATING EXPENSES
    East Goshen Township administrative charge 32,303
    Engineering fees 32,427
    Lease rental rebate 27,409
    Legal and accounting fees 13,000
    Other administrative expenses 1,466
        TOTAL OPERATING EXPENSES 106,605
        OPERATING INCOME 772,285
NONOPERATING REVENUES
    Grant 37,162
    Investment income 1,505
    Tapping fees 45,588
        TOTAL NONOPERATING REVENUES 84,255
        INCOME BEFORE TRANSFERS 856,540
TRANSFERS FROM EAST GOSHEN TOWNSHIP 40,000
TRANSFERS TO EAST GOSHEN TOWNSHIP (485,000)
        CHANGE IN NET POSITION 411,540
NET POSITION AT BEGINNING OF YEAR 127,004
NET POSITION AT END OF YEAR $ 538,544

See accompanying notes to the basic financial statements.

- 8 -

EAST GOSHEN MUNICIPAL AUTHORITY

STATEMENT OF CASH FLOWS
YEAR ENDED DECEMBER 31, 2015

CASH FLOWS FROM OPERATING ACTIVITIES
    Lease rental payments $ 878,890
    Payments to suppliers (107,703)
        NET CASH PROVIDED BY OPERATING ACTIVITIES 771,187
CASH FLOWS FROM NONCAPITAL FINANCING ACTIVITIES
    Net investment in lease (53,341)
    Transfers from East Goshen Township 40,000
    Transfers to East Goshen Township (485,000)
        NET CASH USED BY NONCAPITAL FINANCING ACTIVITIES (498,341)
CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES
    Grant 37,162
    Tapping fees received 45,588
    Principal payments on debt (485,000)
        NET CASH USED BY CAPITAL AND RELATED FINANCING ACTIVITIES (402,250)
CASH FLOWS FROM INVESTING ACTIVITIES
    Investment income 1,505
        NET DECREASE IN CASH AND CASH EQUIVALENTS (127,899)
CASH AND CASH EQUIVALENTS AT BEGINNING OF YEAR 1,589,176
CASH AND CASH EQUIVALENTS AT END OF YEAR $ 1,461,277
RECONCILIATION OF OPERATING INCOME TO NET CASH PROVIDED BY OPERATING ACTIVITIES
    Operating income $ 772,285
    Adjustments to reconcile operating income to net cash provided by operating activities
        Decrease in accounts payable (1,098)
        NET CASH PROVIDED BY OPERATING ACTIVITIES $ 771,187

See accompanying notes to the basic financial statements.

- 9 -

EAST GOSHEN MUNICIPAL AUTHORITY

NOTES TO THE BASIC FINANCIAL STATEMENTS
DECEMBER 31, 2015

NOTE A - SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

East Goshen Municipal Authority (the "Authority") is a component unit of the reporting entity of which East Goshen Township (the "Township") is the oversight unit. In preparing its separate financial statements, the Authority applies the following significant accounting policies.

Purpose of the Authority

The Authority was formed by the Township for the purpose of financing the sewage collection system, which is leased back to the Township for operation. The Authority's members are appointed by the Township.

Basis of Presentation

The basic financial statements are prepared on the basis of Governmental Accounting Standards Board Statement No. 34, Basic Financial Statements--and Management's Discussion and Analysis--for State and Local Governments, and related standards.

Basis of Accounting

The accompanying financial statements are presented on the accrual basis.

Use of Estimates

The preparation of financial statements in conformity with accounting principles generally accepted in the United States of America requires management to make estimates and assumptions that affect certain reported amounts and disclosures. Accordingly, actual results could differ from those estimates.

NOTE B - DEPOSITS AND INVESTMENTS

Custodial Credit Risk - Deposits

Custodial credit risk is the risk that, in the event of a bank failure, the Authority's deposits may not be returned to it. The Authority uses both insurance provided by the Federal Deposit Insurance Corporation and collateralization to guard against custodial credit risk. Under the Authority's current policy, in addition to the insurance provided by the Federal Deposit Insurance Corporation, deposits held by banking institutions are fully collateralized. The Authority requires all of its banking partners to pledge collateral held by an independent third-party institution, not in the Authority's name, in the amount of at least 102% of the deposit value. As of December 31, 2015, $283,321 of the Authority's bank balance of $1,461,490 was covered under FDIC insurance, and the remaining $1,178,169 was collateralized as described.

- 10 -

EAST GOSHEN MUNICIPAL AUTHORITY

NOTES TO THE BASIC FINANCIAL STATEMENTS
DECEMBER 31, 2015

NOTE B - DEPOSITS AND INVESTMENTS (Continued)

Credit Risk

Pennsylvania statutes authorize the Authority to invest in U.S. Treasury bills, short-term obligations of the U.S. Government, obligations of the U.S. Government or Commonwealth of Pennsylvania or political subdivisions of the Commonwealth that are backed by the full faith and credit of the issuing government and shares of authorized investment companies provided that all of the company investments are authorized investments for an authority.

In addition, the Authority may invest in bank deposits, savings accounts, or share accounts of institutions insured by the FDIC, FSLIC, or NCUSIF to the extent that such investments are insured and, where amounts exceed the insured maximums, that the depository pledge collateral as provided by Pennsylvania law.

NOTE C - LEASE AGREEMENT

The sewer system is maintained and operated by the Township under a long-term lease, which expires in 2033.

The lease agreement requires that the Township pay rents to the Authority equal to the amount of the Authority's monthly debt service. The Authority has agreed to rebate 28% of its debt service rental collections on the Guaranteed Note, Series of 1998, to the Township. The amount rebated back to the Township in 2015 was $27,409.

Lease rental collections for 2015 are comprised of the following:

Payment for Authority debt service principal $ 485,000
Payment for Authority debt service interest 393,890
$ 878,890

The Authority's net investment in lease is equal to the balances of the Guaranteed Notes, Series of 1998, Series of 2008 and Series of 2013, less the reserve for future capital expenditures. Lease rental payments equal to the annual principal repayment of the notes are applied to reduce the net investment in lease. The balance at December 31, 2015, was $9,260,809.

- 11 -

EAST GOSHEN MUNICIPAL AUTHORITY

NOTES TO THE BASIC FINANCIAL STATEMENTS

DECEMBER 31, 2015

NOTE D - GUARANTEED NOTES PAYABLE

The following is a summary of changes in guaranteed notes payable for the year ended December 31, 2015:

Beginning Balance Additions Reductions Ending Balance Due Within One Year
NOTES
Series of 1998 $ 365,000 $ - $ (83,000) $ 282,000 $ 89,000
Series of 2008 7,888,000 - (308,000) 7,580,000 320,000
Series of 2013 2,409,000 - (94,000) 2,315,000 97,000
$ 10,662,000 $ - $ (485,000) $ 10,177,000 $ 506,000

Notes payable consisted of:

Guaranteed Note, Series of 1998, to the Delaware Valley Regional Finance Authority (DVRFA), interest, payable monthly, at a fixed rate of 3.84%, principal payable annually through 2018, subject to a swap agreement $ 282,000
Guaranteed Note, Series of 2008, to the DVRFA, interest, payable monthly, at a fixed rate of 3.96%, principal payable annually through 2032, subject to a swap agreement 7,580,000
Guaranteed Note, Series of 2013, to the DVRFA, interest, payable monthly, at a fixed rate of 3.049%, principal payable annually through 2033, subject to a swap agreement 2,315,000
$ 10,177,000

Annual debt service requirements are as follows:

Year Ending December 31, Principal Amount Interest Totals
2016 $ 506,000 $ 381,011 $ 887,011
2017 527,000 361,933 888,933
2018 548,000 342,055 890,055
2019 467,000 322,045 789,045
2020 484,000 304,527 788,527
2021 to 2025 2,714,000 1,235,596 3,949,596
2026 to 2030 3,273,000 685,149 3,958,149
2031 to 2033 1,658,000 100,008 1,758,008
$ 10,177,000 $ 3,732,324 $ 13,909,324

- 12 -

EAST GOSHEN MUNICIPAL AUTHORITY

NOTES TO THE BASIC FINANCIAL STATEMENTS

DECEMBER 31, 2015

NOTE D - GUARANTEED NOTES PAYABLE (Continued)

Funds to repay outstanding notes will be provided from the aforementioned lease agreement. Total interest expense paid during the year ended December 31, 2015, was $393,890. None of the interest costs incurred were charged to expenditures for the year ended December 31, 2015. Total interest capitalized in 2015 was $393,890.

Swap Agreement

The Authority financed the Series of 1998, 2008 and 2013 notes through the DVRFA. The DVRFA has, in turn, entered into interest rate swap agreements with various counterparties to provide fixed interest rates to borrowers. These agreements may be terminated under the following circumstances: (1) DVRFA and the counterparty mutually consent to termination, (2) the borrower defaults on its loan, or (3) DVRFA or the counterparty default or their financial conditions deteriorate to make a default imminent. Upon termination, DVRFA would receive or make a payment depending on the market value of the related interest rate swap. If DVRFA were obligated to make such a payment and sufficient funds were not available, DVRFA could assess each borrower its allocable share of the termination payment.

At December 31, 2015, the market value of the Township's interest rate swap agreements for fixed rate loans was $1,419,327 and for DVRFA bonds was $1,858,219. As of December 31, 2015, DVRFA would have received a payment of nearly $160 million if all of the swap agreements were terminated. None of these amounts are reflected in the Authority's statement of net position or statement of revenues, expenses and changes in net position at December 31, 2015.

- 13 -

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 10, 2016

Mr. Thomas Tran, P.E.
Commonwealth Engineers, Inc.
114 East Lancaster Avenue
Downingtown, PA 19335

Re: Brakman Property Subdivision
1420 East Strasburg Road
West Chester, PA 19380
TPN 53-6-89

Dear Mr. Tran:

Please be advised that at their meeting on May 9, 2016 the East Goshen Municipal Authority approved your request for the connection of the existing dwelling at 1420 East Strasburg Road and the two (2) new dwelling units, which will be constructed on the new lots that will be created as a result of the above referenced subdivision.

The tapping fee for each connection is $2,000. It is our understanding that each of the three connections will utilize a grinder pump and a force main to connect to manhole C373 located on Brooke Drive on manhole C372 located on Strasburg Road. The tapping fee for each of the new dwellings must be paid in full at the time of issuance of the building permit. The tapping fee for the existing dwelling shall be paid prior to the installation of the pump system.

In addition to the tapping fee, you would be responsible for all costs associated with the design of the pump systems, the cost of the Authority's engineer review of those designs, the cost for installation of the pump systems and force mains, the cost to obtain the HOP permit from Penn DOT, the cost of the Authority's Engineer inspection of the installations and the cost to pump and backfill the septic tank and/or cesspool for the existing dwelling. I have enclosed the information requested.

Please give me a call at 610-692-7171 or e-mail at rsmith@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Rick
Louis F. Smith, Jr.
Township Manager

Cc: Nate Kline, PE
Mark Gordon

F:\Data\Shared Data\Property Management\53-4\53-4-37.1 (942 Cornwallis Drive)\Sewer Info\Sewer capacity 121815.doc

Prepared by and Return to:

Patrick M. McKenna, Esq.
Gawthrop Greenwood, PC
17 East Gay Street
P.O. Box 562
West Chester, PA 19381-0562

U.P.I. No. 53-4L-112

-----------------------------------[Space Above This Line For Recording Data]-----------------------------------

SANITARY SEWER AND TEMPORARY CONSTRUCTION EASEMENT AGREEMENT

This Sanitary Sewer and Temporary Construction Easement Agreement (the “Agreement”) is made and entered into on MAY 11th, 2016 by and between the EAST GOSHEN MUNICIPAL AUTHORITY, a municipal corporation duly formed under the laws of the Commonwealth of Pennsylvania (hereinafter, the “Grantee”), and DONALD A. PUSEY AND DEBORAH K. PUSEY, husband and wife (hereinafter “Grantors”).

BACKGROUND

A. Grantors are the owners of a certain parcel of land situated at and known as 1636 Bow Tree Drive, East Goshen Township, Chester County, Pennsylvania, containing 0.59 acres of land more or less, being known as Chester County UPI No. 53-4L-112, and being more fully bounded and described on Exhibit “A” attached hereto and made a part hereof (“Grantors’ Property”).

B. East Goshen Township (“Township”) is the owner of two parcels of land containing approximately six (6) and 42.39 acres of land, more or less, situated in East Goshen Township, Chester County, Pennsylvania, being known and designated as Chester County UPI Nos. 53-4L-18 and 53-4-578 (“Township Properties”), which are immediately adjacent to the southerly and easterly boundary lines of Grantors’ Property, and being depicted on a certain Sanitary Sewer Easement Plan prepared for Grantee by Pennoni Associates, Inc., registered land surveyors and professional engineers, dated 2016-1-27 (Project No. EGMA1504) attached hereto as Exhibit “B” and made apart hereof (the “Plan”) for the purposes set forth in this Agreement.

C. Grantee is the owner of the sanitary sewer system serving the Township and, in order to meet system needs, has designed a new pump station to be constructed on property owned by the Township and located at a certain parcel of land containing 6.8 acres of land, more less, and designated as Chester County UPI No. 53-4P-128 (“Reservoir Road Pump Station”).

D. Grantee desires to construct a sanitary sewer through Township Properties (“Sanitary Sewer”) to connect to the Reservoir Road Pump Station and has requested that Grantors grant to Grantee an easement over their Property to enable Grantee to connect the Sanitary Sewer between Township Properties. Grantors are willing to grant such easement to Grantee, under and subject to the terms and conditions set forth herein.

Now, therefore, in consideration of the mutual covenants and agreements of the parties set forth herein, and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, and intending to be legally bound hereby, the Grantors and Grantee agree as follows:

1. Incorporation of Background. The Background Recitals of this Agreement and the documents to which reference is made therein are incorporated herein by this reference. Any terms used in the substantive provisions of this Agreement that are defined in the background recitals shall have the meaning giving such terms in such recitals.

2. Grant of Easements. In consideration of the sum of Six Hundred Ninety Dollar(s) ($690.00) in hand paid by Grantee to the Grantors at or before the execution and delivery of this Agreement, Grantors hereby grant unto Grantee, its heirs and assigns, the free, uninterrupted, perpetual, permanent and unencumbered easement appurtenant to Township’s Properties across, under and through a portion of the Grantors’ Property described by metes and bounds on Exhibit “C” (“Permanent Easement Area”) attached hereto and made apart hereof and graphically depicted as “Permanent Easement” on the Plan; together with the right of Grantee, its contractors and subcontractors, to enter upon the Easement Area for the purpose of constructing, installing, maintaining, repairing and replacing, from time to time, a Sanitary Sewer for the purpose of conveying sanitary sewage effluent to the Reservoir Road Pump Station. Additionally, Grantors hereby give, grant, bargain, sell, and convey to the Grantee a non-exclusive easement over, upon and across a portion of the Grantors’ Property described by metes and bounds on Exhibit “D” (“Temporary Construction Easement Area”) on the Plan for the purposes set forth in this Agreement, all subject to the terms, conditions, and limitations set forth herein.

3. Purpose of Easements; Construction of Improvements. The sole and limited purpose of the Easements granted hereby is the construction, use, maintenance, inspection, repair and replacement of a Sanitary Sewer within the Permanent Easement Area and Temporary Construction Easement Area (collectively “Easement Areas”) as shown on the Plans, and in accordance with the separate plans and specifications for construction of the Reservoir Road Pump Station for the benefit of the Grantee. To the extent located on the Grantors’ Property, the Sanitary Sewer and related improvements shall be constructed underground.

4. Construction; Maintenance and Repair; Dedication.

a. Any facilities constructed within the Easement Areas by or for Grantee shall be constructed at no cost or expense to the Grantors. Grantee, its heirs and assigns, shall be solely responsible for the maintenance, repair and replacement, from time to time, of all such facilities.

b. All work within the Grantors’ Property in connection with the construction and installation of the Sanitary Sewer shall be subject to the inspection and approval of such work by the Authority Engineer.

c. Upon completion of initial construction, or any subsequent repair or replacement, the surface area of the Easement Areas and all other areas of the Grantors’ Property disturbed by the activities of Grantee, its heirs, assigns, contractors or subcontractors, shall be restored to a condition substantially the same as existed prior to such activities on the Grantors’ Property. Such disturbed areas shall be graded, raked and seeded to the reasonable satisfaction of the Grantors.

5. Temporary Construction Easement Non-Exclusive. The Temporary Construction Easement is non-exclusive, and the Grantee reserves to itself, its successors and assigns, the non-exclusive right to use, pass and repass over and upon the Temporary Construction Easement at all times. Subject to the conditions contained in Section 7 below, each party shall use the rights granted and reserved by this Easement Agreement with due regard to the rights of the other party in use and enjoy the Temporary Construction Easement Area.

6. Termination of Temporary Construction Easement. The Temporary Construction Easement shall terminate upon the completion of the construction of the aforesaid new Sanitary Sewer and Reservoir Road Pump Station. Upon termination of this Easement, the Grantee shall, at its sole cost and expense, promptly record a Notice of Termination of this Easement in the Public Records of Chester County, Pennsylvania, if this Agreement has been recorded.

7. Conduct of the Grantee. The Grantee shall exercise its rights under this Easement Agreement in such a way as to be minimally disruptive to the Grantors’ enjoyment of their property. The Grantee shall provide the Grantors with reasonable written notice prior to using the Easement Property.

8. Indemnification. Grantee, their heirs and assigns, shall indemnify, defend and hold Grantors harmless from and against all liabilities, actions, claims, suits and demands directly or indirectly arising out or caused by or attributable to the acts or omissions of Grantee, its contractors, subcontractors, material suppliers, and its and their employees, agents, servants and independent contractors, on or about the Easement Areas including without limitation all claims for bodily injury (including death), property damage, all mechanics’ lien or similar claims, and all other claims of any kind or descriptions in any way arising out of the exercise of the easement rights granted herein and/or the construction, operation, maintenance, repair, or replacement of facilities constructed within the Easement Areas. Such indemnification shall include costs and reasonable attorneys’ fees incurred by Grantors in recovering under this indemnity. Before entering (or causing its contractors, agents or employees to enter) upon the Easement Areas for any purpose, Grantee shall furnish to Grantors a certificate of insurance, evidencing that the contractor performing the work has obtained commercial general liability and property damage coverage with limits reasonably satisfactory to the Grantors, naming Grantors as an additional insured, which certificate shall further evidence that Grantee’s contractor has in place worker’s compensation insurance as required by law, and such other insurance coverage as is reasonably required by Grantors and that is consistent with insurance types and limits maintained by responsible contractors performing similar work.

9. Easements Running with the Land. This Agreement and the easements, covenants and agreements of the parties set forth herein shall constitute easements, covenants and agreements running with the land on which the Easement Areas are located, and shall inure to the benefit of the Grantee’s Property, respectively, and shall be binding upon and inure to the benefit of the present and future owners thereof and their respective heirs, personal representatives, successors and assigns, tenants and subtenants. Any reference to “Grantee” herein shall be deemed to refer to the owner(s), at the relevant time, of Grantee’s Sanitary Sewer.

10. Governing Law. This Agreement shall be governed and construed in accordance with the laws of the Commonwealth of Pennsylvania.

11. Entire Agreement; Amendment. This Agreement is the entire and only understanding and agreement with respect to the subject matter hereof, and supercedes all prior and contemporaneous agreements, understandings, inducements or conditions, express or implied, oral or written. This Agreement may not be modified or amended other than by a written agreement, in writing, executed by the then-owners of record of the Easement Areas and the Grantee’s Sanitary Sewer, and the recording thereof in the Office of the Recorder of Deeds in the County of Chester, Pennsylvania.

IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written.

EAST GOSHEN MUNICIPAL AUTHORITY

By: _________________________________
Dana Pizarro, Chairman

[Signature: Donald A. Pusey]
_________________________________
Donald A. Pusey

[Signature: Deborah K. Pusey]
_________________________________
Deborah K. Pusey

F:\Data\Shared Data\ABCS\Municipal Authority\Projects\Reservoir Road PS\Easement\Pusey Easement 03-18-2016.doc

Rick Smith

From: "John Jam" Jamgochian-RE/MAX Preferred <realtor@johnjam.com>
Sent: Tuesday, May 24, 2016 4:01 PM
To: Rick Smith
Cc: Tom Krinock (tomkrin@aol.com)
Subject: Public Sewer Tie In

Rick Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Thomas J. & Mary Jo Krinock
1329 N. Chester Road Malvern, PA. 19355 (East Goshen Township)
Tax Folio # 53-02-0020-03A

Rick,

I am the realtor representing the above owners on the sale of 1329 N. Chester Road. We would like to pursue the possibility of knowing what would be involved to tie into the public sewer system. Mr. & Mrs. Krinock’s property boarders the Reserve at Spring Meadow and at the far right side of the Krinock’s rear property is a 4 inch plastic PVC sewer vent with closed cap in that location. I believe this is access to a possible tie in for public sewer. When you have time, would you please confirm if this is a possibility and what would be involved along with hard costs that may required by East Goshen Township?

Thank you!

John

"John Jam"
Jamgochian
Associate Broker
PA. License # AB067522
Office License # RO301283

RE/MAX®
Preferred

1595 Paoli Pike Suite 101
West Chester PA. 19380
610-719-1700 Main Office
610-235-4400 Direct Line
610-316-9623 Cell
1- 866-277-3377 Fax
www.JohnJam.com Web-Site
Realtor@JohnJam.com E-Mail

Selling? Buying? Investing? Renting?

1

Rick Smith

From: Donohue Home <donohues5@comcast.net>
Sent: Thursday, June 02, 2016 2:01 PM
To: Rick Smith
Cc: Mark Miller
Subject: Re: 1631 Hunter Circle

Thanks Rick. Let me know if you need more of if I need to appear.

John

Sent from my iPhone

> On Jun 2, 2016, at 8:33 AM, Rick Smith <rsmith@eastgoshen.org> wrote:
>
> John
>
> I received your request.
>
> It will be on the MA agenda for June 13.
>
> The Tapping Fee is $2,000 and the inspection fee is $60.
>
> I will have the Public Works Department see if there is a lateral stub
> for your property. If there is not one your plumber would have to install one.
>
> Rick
>
> -----Original Message-----
> From: John Donohue [mailto:donohues5@comcast.net]
> Sent: Wednesday, June 01, 2016 3:31 PM
> To: rsmith@eastgoshen.org
> Subject: FW: 1631 Hunter Circle
>
> Sorry Rick I inserted a dot in the address below
>
> -----Original Message-----
> From: John Donohue [mailto:donohues5@comcast.net]
> Sent: Wednesday, June 01, 2016 3:21 PM
> To: 'Mark Miller' <mmiller@eastgoshen.org>; 'r.smith@eastgoshen.org'
> <r.smith@eastgoshen.org>
> Subject: RE: 1631 Hunter Circle
>
> Gentlemen
>
> I spoke to Rick today about the process for getting permission from
> East Goshen Township to connect to the sewer line that runs through my
> back yard at 1631 Hunter Circle. I was told that in order to be
> considered by the Municipal Authority at the next meeting on June 13,

1

> I only needed to send an email making the connection request.
>
> This email is my request to connect to sewer line that runs through
> my backyard at 1631 Hunter Circle.
>
> Let me know if you need any further information. Thank you.
>
> John P. Donohue, Jr.
> 1631 Hunter Circle
> West Chester, PA 19380
>
> 610-725-9128
>
> -----Original Message-----
> From: Mark Miller [mailto:mmiller@eastgoshen.org]
> Sent: Wednesday, May 25, 2016 1:16 PM
> To: 'John Donohue' <donohues5@comcast.net>
> Subject: RE: 1631 Hunter Circle
>
> Mr. Donohue
> The plans don't show a wye connection as you know the sewer is right
> there and you could easily tie in. Should you want to go that route
> please let me know so I can take your request to the Municipal
> Authority for there next meeting which is June 13th.
> Take Care
> Mark
>
>
>
>
>
> Mark S. Miller
> Director of Public Works
> East Goshen Township
> 1580 Paoli Pike
> West Chester, PA 19380
> O: (610) 692-7171 x3402
> F: (610) 692-8950
> mmiller@eastgoshen.org
> www.eastgoshen.org
>
>
> -----Original Message-----
> From: John Donohue [mailto:donohues5@comcast.net]
> Sent: Wednesday, May 25, 2016 11:51 AM
> To: 'Mark Miller'
> Subject: RE: 1631 Hunter Circle
>
> Mark
>
> I am wondering if you can do me a favor. We are having some issues
> with our septic system and may need to tie into the sewer line in our

2

> back yard that we discussed below back in 2013. Can you find out if a
> connecting T was installed on our property for us to use? Someone
> from Horn Plumbing may also be making this same inquiry. Thanks.
>
> John
>
> -----Original Message-----
> From: Mark Miller [mailto:mmiller@eastgoshen.org]
> Sent: Wednesday, August 21, 2013 12:37 PM
> To: 'Donohue Home' <donohues5@comcast.net>
> Subject: RE: 1631 Hunter Circle
>
> Great
> Thank you
>
> -----Original Message-----
> From: Donohue Home [mailto:donohues5@comcast.net]
> Sent: Wednesday, August 21, 2013 10:03 AM
> To: mmiller@eastgoshen.org
> Subject: 1631 Hunter Circle
>
> Mark
>
> Just wanted you to know I found and flagged the pipe in our back yard.
>
> John
>
> Sent from my iPhone
>
>
>

3

610-692-7171
www.eastgoshen.org

FYI

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 20, 2016

Dear Property Owner:

The purpose of this letter is to inform you that Gunnison Development Co., LLC equitable owner of 1420 E. Strasburg Rd., West Chester, PA 19380 has submitted a Subdivision and Land Development application for the property. The applicant is proposing to subdivide the 5.079 acre parcel into three lots and build two new single family homes. The full application and plans are available for review at the Township building. The new development will be served by public water and public sewer

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of subdivision and land development applications. The meeting dates for this matter are listed below and subject to change without further written notice:

June 1, 2016 – Planning Commission (7:00 PM)
June 8, 2016 Conservancy Board (7:00 PM)
July 6, 2016 – Planning Commission (7:00 PM)
August 3, 2016 – Planning Commission (7:00 PM)
August 16, 2016 – Board of Supervisors (7:00 PM)

All meetings are held at the Township Building and are open to the public. The Subdivision and Land Development Application is available for review at the Township building during normal business hours. If any person who wishes to attend the meetings has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate, he or she should contact East Goshen Township at 610-692-7171 to discuss how those needs may be accommodated.

Please give me a call if you have any questions or need additional information.

Sincerely,

[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer

CC: All Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-6\53-6-89 (1420 E. Strasburg Rd.)\2016 SD application\1000 foot letter SDandLD 05202016.doc

610-692-7171
www.eastgoshen.org

FYI

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

May 20, 2016

Dear Property Owner:

On Monday, June 27, 2016, at 7:30 P.M. prevailing time, at the East Goshen Township Building, 1580 Paoli Pike, West Chester, Pennsylvania, the East Goshen Township Zoning Hearing Board will conduct a public hearing on the appeal of Thomas Kevin Carney from the determination of the Zoning Officer with respect to the property located at 1325 Park Avenue, East Goshen Township, Chester County, Pennsylvania (Tax Parcel No. 53-6-45).

In particular, on April 5, 2016 the Zoning Officer issued a Zoning Ordinance Violation Enforcement Notice with respect to 1325 Park Avenue because the Township believed a home occupation or home related business was being conducted at the property without township approvals and/or permits. It is from this Enforcement Notice that the Applicant has filed the appeal.

If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact the Township Building at 610-692-7171, to discuss how those needs may be accommodated.

The Zoning Hearing Board Application is available for review at the Township building during normal business hours.

Please give me a call if you have any questions or need additional information.

Sincerely,

[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer

CC: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-6\53-6-45 (1325 Park Ave.)\Zoning Appeal\1000 foot letter ZHB 05202016.doc