Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
January 9, 2017
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report
- APPROVAL OF MINUTES December 12, 2016
- APPROVAL OF INVOICES Pennoni Invoice #726816 $1,784.25; Pennoni Invoice #726817 $4,042.50; Pennoni Invoice #726818 $1,000.25; Pennoni Invoice #726819 $ 373.75; Gawthrop Invoice #157998 $ 500.00 already paid
- LIAISON REPORTS
- FINANCIAL REPORTS December Financial Report
- OLD BUSINESS
- GOALS Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, February, March, April, May, June, July, August, September, October, November, December; Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively “I&I”) Plan to reduce the amount of I&I into the sewer system.
F:\Data\Shared Data\Agendas\Municipal Authority\2017\1-9-2017.doc
- Respond to capacity requests within 45 days. 943 Cornwallis Drive, 1420 East Strasburg Road (3 EDUs), 1329 North Chester Road, 1631 Hunter Circle, 411 Misak Drive
- Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. Currently under review by staff.
- Submit topical articles of interest for the East Goshen newsletter. Winter, Summer,
- Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March, May, June, July, August, September, October, November, December. January 2017
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2017\1-9-2017.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
January 5, 2017
To: Municipal Authority
From: Mark Miller
Re: December 2016 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 689,000.
Meters: Meters were read on a daily basis. The portable meters were read on a by-weekly basis.
C.C. Collection: Pump stations were visited on a daily basis. The Barkway Pump Station wet well was cleaned and vacuumed out due to heavy grease build up.
We located and repaired two lateral breaks, both were on Meadow Drive, each was allowing approx. 15,000 to 20,000 gallons per day. We also located a line break on Bramble Lane. This should have this repaired next week.
We televised 36,000 LF of pipe in quadrant 3; we also replaced 12 sewer caps.
R.C. Collection: We visited the pump station on a daily basis.
We installed 12 charcoal inserts on Cornwallis Drive to control odors.
We are gearing up to clean the sewer right-of-way behind the homes in Hershey Mill Estates.
R.C. Plant: We completed the soda ash storage building with the exception of the vinyl siding.
We trenched in conduit for the sampler.
Alarms: We responded to 23 alarms for December.
PA One Calls: We received 64 Pa One calls December.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
January 6, 2017
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- The NPDES Permit expires on February 28, 2017. The permit renewal application was finalized and submitted to PADEP on August 31, 2016. No changes to the existing permit are proposed. (No update since last report).
- We continued the evaluation of alternatives for automated alkalinity chemical feed systems to eliminate manual feeding and carrying bags up the exterior steps, including tank sizing and chemical cost analyses. The preferred alternative is a change to caustic soda from the current soda ash treatment. We are coordinating feasibility and details with the operator and will provide an updated letter report by the February MA meeting.
- Dutchland repaired the additional bubbles in the SBR #3 CIM coating that were identified lower on the walls after repair the peeling coating at the top. It is our understanding that the tank has been refilled and is back in use.
Reservoir Road Pump Station
- PADEP issued the State Water Obstruction and Encroachment Permit for the pump station site and Chester Creek utility crossing in June 2016; however, they are requiring a separate federal authorization by the Army Corps of Engineers (ACOE). We coordinated with both PADEP and ACOE on this additional review in July and are still awaiting feedback. (No update since last report).
- We revised the NPDES plans and permit application again to address two new minor comments from CCCD that they issued on December 19, 2016, and we resubmitted to CCCD on December 22, 2016.
- The Water Quality Management (WQM) Permit application was submitted to PADEP on April 13, 2016. They have informally notified us that they have no comments and are prepared to issue the WQM Permit once the aforementioned NPDES Permit is issued. (No update since last report).
- We previously prepared the front end of the bid document and Division 01 specification sections, including a draft Bid Form. The Bid Form needs to be finalized. Technical specifications were already prepared as part of the WQM Permit application. The full bid document will be completed, assembled, and forwarded to the Township upon receipt of the three remaining permits. (No update since last report).
- We will complete a listing of the permits, expiration dates, and renewal deadlines once the three remaining permits are issued. We anticipate including that listing in future Engineer's Reports to track the permit statuses. (No update since last report).
RCSTP and Pump Stations' O&M Manual
- No update since the last report.
EGMA1701
January 6, 2017
Page 2
East Goshen Municipal Authority
Engineer’s Report
White Chimneys Manhole Replacement
- We will provide assistance as requested by the Township during construction.
Semi-Annual I&I Reports
- We previously evaluated apparent inconsistencies in the overall Chester Creek subbasin flows (as metered at the Westtown Way meter) between meter data, averages provided by East Goshen, and billing records from West Goshen, and we will discuss with the PW Department to resolve.
Sunoco Pipeline
- Sunoco previously agreed to add a condition to the approval letter they are requesting from East Goshen that they (Sunoco) will physically locate the Ashbridge PS force main at the proposed pipeline crossing location and that an East Goshen representative must be present when any work is done near the force main. We had also coordinated with them on a potential conflict with the proposed Reservoir Road PS force main, but there has not yet been a resolution to our knowledge. (No update since last report).
New Connections
- 1420 E. Strasburg Road, Brakman Property – A 3-lot grinder pump system is proposed. We attended a review meeting with the developer, Township staff, and design consultant on December 14, 2016. We are awaiting a revised design submission to address sanitary sewer comments.
- 1680 E. Boot Road, Knauer Property – We issued comments on the proposed gravity sewer laterals on December 14, 2016.
DCED Small Water & Sewer Program Grant
- The Township submitted a grant application for the installation of three permanent gravity sewer flow meters in October. The grant agency, the Commonwealth Financing Authority, is scheduled to award grants in March 2017. (No update since last report).
West Goshen Sewer System Consultation
- No activity since last report.
P:\Projects\EGMA\Memos to Board\2017\Engineers Report 2017-01-06.docx
Big Fish Environmental Services Inc.
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during November 2016. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. Repairs to SBR 3 were completed during December. Repairs to the alum feed pumps to the SBRs were completed during the month. No mechanical or operational issues were observed during operation of sludge dewatering equipment.
Treatment Process Operation
During November 2016, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected on average twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average had a concentration of 0.30 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the November 2016 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.18 to 0.59 mg/L.
Table 1
November 2016 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| November 1, 2016 | 0.313 | 3.80 | 9.9 | 8 | 20.9 | 0.106 | 0.28 | 0.59 | 1.54 | 1 | 0.0000 |
| November 3, 2016 | 0.287 | 8 | 19.1 | ||||||||
| November 8, 2016 | 0.269 | 2.00 | 4.5 | 3 | 6.7 | 0.100 | 0.22 | 0.17 | 0.38 | 1 | 0.0000 |
| November 10, 2016 | 0.280 | 2 | 4.7 | ||||||||
| November 15, 2016 | 0.280 | 2.00 | 4.7 | 10 | 23.4 | 0.103 | 0.24 | 0.33 | 0.77 | 1 | 0.0000 |
| November 17, 2016 | 0.303 | 6 | 15.2 | ||||||||
| November 22, 2016 | 0.287 | 3.80 | 9.1 | 4 | 9.6 | 0.100 | 0.24 | 0.19 | 0.45 | 1 | 0.0000 |
| November 24, 2016 | 0.370 | 4 | 12.3 | ||||||||
| November 29, 2016 | 0.373 | 2.00 | 6.2 | 10 | 31.1 | 0.100 | 0.31 | 0.20 | 0.62 | 1 | 0.0000 |
| Average | 0.307 | 2.72 | 6.9 | 6 | 15.9 | 0.10 | 0.26 | 0.30 | 0.75 | 1 | 0.0000 |
| Minimum | 0.269 | 2.00 | 4.5 | 2 | 4.7 | 0.10 | 0.22 | 0.17 | 0.38 | 1 | 0.0000 |
| Maximum | 0.373 | 3.80 | 9.9 | 10 | 31.1 | 0.11 | 0.31 | 0.59 | 1.54 | 1 | 0.0000 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 7
Discharge to Applebrook, Outfall 002, remained discontinued during November and will remain off line until the spring of 2017
Table 2 illustrates the influent composite sample data reported for the November 2016.
Table 2
November 2016 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| November 1, 2016 | 0.374 | 215 | 671 | 268 | 836 | 33.4 | 104 | 39.8 | 124 | 4.7 | 15 |
| November 8, 2016 | 0.331 | 103 | 321 | 104 | 324 | 45.4 | 142 | 52.3 | 144 | 6.2 | 19 |
| November 15, 2016 | 0.336 | 192 | 599 | 300 | 936 | 68.5 | 214 | 52.4 | 147 | 6.3 | 20 |
| November 22, 2016 | 0.380 | 138 | 430 | 212 | 661 | 51.5 | 161 | 53.7 | 170 | 5.6 | 17 |
| November 29, 2016 | 0.466 | 225 | 702 | 186 | 580 | 34.1 | 106 | 38.9 | 151 | 4.4 | 14 |
| Average | 0.377 | 175 | 545 | 214 | 668 | 46.6 | 145 | 47.4 | 147 | 5.4 | 17 |
| Minimum | 0.331 | 103 | 321 | 104 | 324 | 33.4 | 104 | 38.9 | 124 | 4.4 | 14 |
| Maximum | 0.466 | 225 | 702 | 300 | 936 | 68.5 | 214 | 53.7 | 170 | 6.3 | 20 |
Table 3 presents the available Outfall 001 final effluent data for the month of December 2016. During October, the presence of foam conditions on the surface of the SBRs began to increase with foam concentrations ranging from 60% to 100% of the area.
During November, there are no anticipated exceedances of the permitted limitations for Outfall 001. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 7
Big Fish Environmental Services Inc.
Table 3
December 2016 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| December 1, 2016 | 0.359 | 5 | 15.0 | ||||||||
| December 6, 2016 | 0.346 | 3.0 | 8.7 | 4 | 11.5 | 0.197 | 0.57 | 0.27 | 0.78 | 3 | 0.4771 |
| December 8, 2016 | 0.318 | 3 | 8.0 | ||||||||
| December 13, 2016 | 0.309 | 2.0 | 5.2 | 4 | 10.3 | 3.470 | 8.94 | 0.23 | 0.59 | 1 | 0.0000 |
| December 15, 2016 | 0.362 | 2 | 6.0 | ||||||||
| December 20, 2016 | 0.359 | 5.5 | 16.5 | 4 | 12.0 | 0.701 | 2.10 | 0.33 | 0.99 | 2 | 0.3010 |
| December 22, 2016 | 0.372 | 3 | 9.3 | ||||||||
| December 27, 2016 | 0.341 | 0.25 | 0.71 | ||||||||
| Average | 0.346 | 3.5 | 10.1 | 4 | 10.3 | 1.46 | 3.87 | 0.27 | 0.77 | 2 | 0.2594 |
| Minimum | 0.309 | 2.0 | 5.2 | 2 | 6.0 | 0.20 | 0.57 | 0.23 | 0.59 | 1 | 0.0000 |
| Maximum | 0.372 | 5.5 | 16.5 | 5 | 15.0 | 3.47 | 8.94 | 0.33 | 0.99 | 3 | 0.4771 |
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during November 2016.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 7
Big Fish Environmental Services Inc.
Table 4
December 2016 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| December 6, 2016 | 0.470 | 101 | 396 | 166 | 651 | 49.0 | 192 | 56.9 | 223 | 6.1 | 24 |
| December 13, 2016 | 0.391 | 91.2 | 357 | 40 | 157 | 44.7 | 175 | 44.8 | 146 | 5.2 | 20 |
| December 20, 2016 | 0.423 | 85.5 | 335 | 144 | 564 | 45.7 | 179 | 52.1 | 184 | 5.1 | 20 |
| December 27, 2016 | 0.459 | ||||||||||
| Average | 0.436 | 93 | 363 | 117 | 457 | 46.5 | 182 | 51.3 | 184 | 5.5 | 21 |
| Minimum | 0.391 | 86 | 335 | 40 | 157 | 44.7 | 175 | 44.8 | 146 | 5.1 | 20 |
| Maximum | 0.470 | 101 | 396 | 166 | 651 | 49.0 | 192 | 56.9 | 223 | 6.1 | 24 |
Sequencing batch reactors (SBRs) numbered 1, 2 and 4 were in service during November and December. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs decreased to from 68.5 gpd to 61.6 gpd. Soda ash daily addition increased from 397 lbs./day to 421 lbs./day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
SBR No. 3 remains out of service as a treatment unit. The SBR is scheduled to be returned to service on January 14th.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 7
Big Fish Environmental Services Inc.
Solids Dewatering and Disposal: December 2016
| Sludge Dewatering Summary | |
|---|---|
| Gallons of sludge dewatered | 279,475 |
| Number of dumpsters | 4 |
*Twenty two (22) days of centrifuge operation
Flow data:
| Flow Meter Location | December 2016 | ||
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd | |
| Influent Wastewater to Screening Building* | 13.725 | 442,751 | 565,470 |
| Influent Wastewater to SBRs | 14.636 | 472,140 | 539,200 |
| Internal Recycle | 1.082 | 35,603 | 88,292 |
| Treated Effluent to Disc Filters | 14.297 | 461,198 | 540,480 |
| Final Effluent Discharge | 11.138 | 359,290 | 434,000 |
| Applebrook Golf Course | No Discharge | No Discharge | No Discharge |
Chemical Usage:
| Chemical | December 2016 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 421 | 12,700 |
| Aluminum Sulfate solution | 61.6 | 1,909 |
| Polymer (centrifuge) | 0.84 | 18.48 |
*Twenty two (22) days of centrifuge operation
During December, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank No. 1 was in service. The level at the beginning of the month was 9.28 feet and the level at the end of the month was 11.49 feet. Zero (0) gallons of supernatant were decanted during the month. Zero (0) pounds of soda ash were added. The average pH concentration was measured as 6.95.U. average total alkalinity measured as 198 mg/l and average total solids concentration measured as 0.69%.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 7
Big Fish Environmental Services Inc.
Sludge holding tank No. 2 was in service. The level at the beginning of the month was 12.63 feet and the level at the end of the month was 11.01 feet. Zero (0) gallons of supernatant were decanted during the month. Two hundred and fifty (250) pounds of soda ash were added. The average pH concentration was measured as 6.66 S.U., average total alkalinity measured as 190 mg/l and average total solids concentration measured as 1.03%.
PA DEP
No activity
Significant Storm/Hydraulic Loading Events
During December, there were three (3) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24 hour period. A total of 3.81 inches of rainfall were measured during the month. These events occurred on:
- December 6 th : 0.95 inches
- December 11 th : 0.51 inches
- December 17 th : 0.76 inches
December 23rd through the 25th experienced consistent precipitation during the three consecutive days totaling 0.96 inches.
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times. The facility experienced several filled decant cycles during the rain events.
Minor Repairs and Preventative Maintenance
December 1, 2016: SBR number 4 maximum decant alarm.
December 5, 2016: Dutchland contractors on site beginning repairs to SBR 3.
December 13, 2016: Lenni Electric on site reinstalling the electric heaters in the Screening Building.
December 14, 2016: Drained and cleaned both disc filters.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 7
Big Fish Environmental Services Inc.
December 19, 2016: Township staff installed the motive and sludge pumps for BR3.
December 25, 2016: SBR number 4 maximum decant alarm
December 26, 2016: SBR number 4 maximum decant alarm
December 28, 2016: Drained and cleaned both disc filters.
December 29, 2016: Drained and cleaned disc filter number 1.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 7
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
December 12, 2016
The East Goshen Township Municipal Authority held their regular public meeting on Monday, December 12, 2016 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Dana Pizarro, Ed McAssey, Jack Yahraes, and Phil Mayer. Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Patrick McKenna, Attorney, and Walter Wujcik, Conservancy Board.
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and all veterans.
Dana asked if anyone would be recording the meeting. There was no response.
Sewer Reports
1. Director of Public Works, Mark Miller provided the following report for November:
Monthly Flows: The average daily flow to West Goshen was 680,000 gallons per day.
Meters: The meters were read on a daily basis. The permanent meters were calibrated on December 9th.
C.C. Collection: It was rather busy on Thanksgiving. We had a sewer blockage at 28 Lochwood Lane. We received a call from the 911 center that a resident’s sewer backed up into their house and that Roto Rooter was on the scene reporting that the Township’s system was blocked. When I arrived I was met by Roto Rooter who said that they made several attempts to clear the sewer main but were unsuccessful. When our men arrived we jetted the main line, which was full of roots. We also found that the manhole was a drop manhole and that the drop was partially collapsed. Since we backed up the sewage into the house, Belfor was called to take care of sanitizing the basement. On November 28th we excavated the sewer line due to the depth and the condition of the drop. We chose to abandon the outside drop and we installed a new drop inside the manhole. We plugged the old drop and filled it with concrete. I have attached some pictures of the repair.
We had a problem at Hershey Mill Pump Station when the muffin monster tripped out and caused the main to back up. The crew happened to be working around the corner when the problem occurred so there is minimal carry over. In both instances I contacted DEP to report the carry over. While installing the temporary meters we found a broken
MA 12-12-16 draft
1
sewer lateral with 10 to 15 thousand gallons of infiltration. We also spent two days clearing the sewer right of way in Supplee Valley.
R.C. Collection – We have completed the rebuilding of the Hunt Country Pump Station.
R.C. Plant: We are in the process of building a storage building for the soda ash. Dutchland had been in to make the repairs to the SBR. The sludge pump was pulled in SBR1. The pump is not worth rebuilding so it was replaced with a spare.
INI Repairs: 12 sewer cap replacements after residents called about caps missing.
Alarms: We responded to 15 alarms for November.
PA One Calls: We received 68 PA One calls for November.
2. Pennoni Engineer’s Report for November
Mike Ellis provided the following report.
Invoices: Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP):
- The NPDES Permit expires on February 28, 2017. The permit renewal application was finalized and submitted to PADEP on August 31, 2016. No changes to the existing permit are proposed. (No update since last report)
- We continued the evaluation of alternatives for automated alkalinity chemical feed systems to eliminate manual feeding and carrying bags up the exterior steps, including tank sizing and chemical cost analyses. The preferred alternative is a change to caustic soda from the current soda ash treatment. An updated summary letter and discussion will be provided at the December meeting.
- We met with Dutchland at the RCSTP about repairs to address the peeling at the top of the CIM coating in SBR #3 and the need to re-patch the lifting anchor holes throughout the entire SBR deck. Dutchland performed the repairs thereafter. However, during the follow-up inspection, additional bubbles in the coating were identified lower on the walls in the SBR#3. This bubbling is more extensive than in the other SBR tanks and we are coordinating with Dutchland on a repair.
Reservoir Rd Pump Station:
- PADEP issued the State Water Obstruction and Encroachment Permit for the pump station site and Chester Creek utility crossing in June 2016; however, they are requiring a separate federal authorization by the Army Corps of Engineers (ACOE). We coordinated with both PADEP and ACOE on this additional review in July and are still awaiting feedback. (No update since last report)
- We revised the NPDES plans and permit application to address CCCD’s and DEP’s latest comments and resubmitted to CCCD on November 23, 2016.
- The Water Quality Management (WQM) Permit application was submitted to PADEP on April 13, 2016. They have informally notified us that they have no comments and are prepared to issue the WQM Permit once the aforementioned NPDES Permit is issued. (No update since last report)
- We previously prepared the front end of the bid document and Division 01 specification sections, including a draft Bid Form. The Bid Form still needs to be finalized. Technical specifications were already prepared as part of the WQM Permit application. The full bid document will be completed, assembled, and forwarded to the Township upon receipt of the three remaining permits. (No update since last report)
MA 12-12-16 draft
2
- We will complete a listing of the permits, expiration dates, and renewal deadlines once the three remaining permits are issued. We anticipate including that listing in future Engineer’s Reports to track the permit statuses. (No update since last report)
RCSTP and Pump Stations’ O&M Manual
- We are continuing to add information as provided by the Township as follow-up to our October 5 th review meeting with Mark Miller.
White Chimneys Manhole Replacement
- No activity since the last report. We will provide assistance as requested by the Township during construction.
Semi-Annual I&I Reports
- We evaluated apparent inconsistencies in the overall Chester Creek subbasin flows (as metered at the Westtown Way Meter) between meter data, averages provided by East Goshen and billing records from West Goshen. We will discuss with the PW Department to resolve.
Sunoco Pipeline
- No activity since last report. Sunoco previously agreed to add a condition to the approval letter they are requesting from East Goshen that they (Sunoco) will physically locate the Ashbridge PS force main at the proposed pipeline crossing location and that an East Goshen representative must be present when any work is done near the force main. We have also coordinated with them on a potential conflict with the proposed Reservoir Road PS force main, but there has not yet been a resolution to our knowledge.
New Connections
- 3 & 5 School Lane - We reviewed another set of revised plans and calculations for the proposed 2-lot grinder pump system and we found the design to be acceptable.
- 1420 E. Strasburg Road, Brakman Property – We reviewed revised plans for the proposed 3-lot grinder pump system as proposed for development by Brandolini, and provided comments. A review meeting with the developer, township staff and Pennoni is scheduled for December 14, 2016.
- 1680 E. Boot Road, Knauer Property – We reviewed a proposed plan for construction of a gravity sewer lateral to service a building addition. We anticipate comments will be issued by December12, 2016.
DCED Small Water & Sewer Program Grant
- The Township submitted a grant application for the installation of three permanent gravity sewer flow meters in October. The grant agency, the Commonwealth Financing Authority, is scheduled to award grants in March 2017.
West Goshen Sewer System Consultation
- We attended the first regular WGSA Municipal Partners meeting on November 22, 2016.
3. Big Fish Environmental Services – Scott’s report for November showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during October 2016. Discharge to Applebrook was discontinued during October and November. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. Inspection of SBR 3 was completed with repairs scheduled for early December. No mechanical or operational issues were observed during operation of sludge dewatering equipment.
MA 12-12-16 draft
3
Capacity Requests
1668 E. Boot Road – Present were John and Linda O’Connell, owners, and Jim Renehan, builder. They are requesting 1 EDU for the house they are planning to build. Mr. O’Connell has a permit to build the house with an on-lot system but would like to connect to the public sewer system. Mr. David Ludin, 1670 E. Boot Road, has agreed to allow Mr. O’Connell to utilize his sewer line to provide service to the new house. However, a 4” line was originally installed to Mr. Ludin’s house. More than one house on a line requires a 6” line. Mr. Renehan had Horn Heating & Plumbing scope the line. They believe that the additional flow from the new house would improve the performance in the line. Horn recommended a manhole on Ludin’s property instead of a T-connection. The easement to the street was discussed. Patrick will discuss this easement with Rick Smith and Mark Gordon. The Authority commented that there is the capacity for this new house. Jack moved to grant this request for 1 EDU at 1668 E. Boot Road. Phil seconded the motion. The motion passed unanimously. The applicant should have an engineering plan submitted to Mark Gordon.
Approval of Minutes
The minutes of the November 14, 2016 were approved as amended.
Approval of Invoices
1. Phil moved to approve payment of the following Pennoni invoices:
- Pennoni #722178 $1,622.25
- Pennoni #722179 $ 656.75
- Pennoni #722181 $ 355,25
Jack seconded the motion. The motion passed unanimously.
Liaison Report
Conservancy Board – Walter reported that 18 trees were planted along E. Boot Road near the Plank House. They tagged some dead trees in Clymers for removal. One beaver dam on Chester Creek along Reservoir Road was removed.
Financial Reports
Jon Altshul provided the following written report:
In November, the Municipal Authority recorded $286 in interest income and $640 in legal expenses for a negative variance of $354. As of November 30th, the fund balance was $1,453,798, of which $1,375,022 is in the main construction account (most of which represents the 2013 note).
Goals
Goals for 2016 were reviewed.
Old Business
Alkalinity – Mike gave an update on the investigation to change from soda ash, which is being manually fed and is not easy or safe, to a liquid caustic soda feed. There would have to be an outside tank that would hold 5,000-6,000 gallons. There would be 1 pump and additional piping and electric. A delivery would be 4,200 gallons, which would be a 33 day supply. Mark pointed
MA 12-12-16 draft
4
out that there is an empty tank on the property. Mike will look at it. Mark also reported that Public Works just built a shed for storage. Mike will do a cost analysis for the next meeting.
New Business
Capacity Request – Christopher Knauer, 1680 E. Boot Road – He is requesting 1 EDU for the new house and 1 EDU for a future lot. There is a sewer easement agreement with the abutting neighbors. Jack moved to grant the request for 2 EDUs at 1680 E. Boot Road. Phil seconded the motion. The motion passed unanimously.
Pennoni 2017 Fees – Mike reviewed the proposed fees and budgets for 2017. The average increase is 3.3%. Ed moved to approve the Pennoni fees and budgets for 2017. Phil seconded the motion. The motion passed unanimously.
Auditors – After review, Phil moved to approve Maillie as auditors to do the 2016 audit in 2017 at a cost of ,200. Jack seconded the motion. The motion passed unanimously. Dana will sign the authorization.
Lochwood Chase Sewage Treatment Plant Diversion – The closeout was approved by the Chester County Conservation District.
West Goshen Township Meeting – The HRG spreadsheet that was included in the information packet that was distributed at the combined meeting was discussed. It was decided that we need a breakdown of costs for East Goshen. Then an audit can be done. Ed will attend the January meeting.
Reorganization for 2017: Jack moved to approve the following positions for 2017:
- Chairman – Ed McAssey
- Vice Chairman – Jack Yahraes
- Secretary – Kevin Cunningham
- Treasurer – Phil Mayer
- Asst. Secretary/Treasurer – Dana Pizarro
Adjournment
There being no further business, Ed moved to adjourn the meeting. Jack seconded the motion. The meeting was adjourned at 8:45 pm. The next meeting will be held on Monday, January 9, 2017 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 12-12-16 draft 5
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 726816 Invoice Date : 12/29/2016 Project : EGMA1504 Project Name : Reservoir Rd PS Design & Permitting |
|---|
For Services Rendered through: 12/11/2016
Completed and resubmitted revised NPDES permit plans, Notice of Intent application forms, supporting stormwater calculations, and response letter to CCCD to address their August 19, 2016 NPDES and E&S comments.
Phase : 12 -- Permitting
| Total Phase : 12 -- Permitting | Labor : | 1,784.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,784.25 |
| Amount Due This Invoice | ,784.25 |
|---|
Phase : 12 -- Permitting
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 12.00 | 115.00 | 1,380.00 |
| Engineering Technician II | 5.25 | 77.00 | 404.25 |
| Labor Total: | 17.25 | 1,784.25 |
| Total Phase : 12 -- Permitting | Labor : | ,784.25 |
|---|---|---|
| Expense : | bash.00 | |
| Total Project : EGMA1504 – Reservoir Rd PS Design & Permitting | Labor : | ,784.25 |
| Expense : | bash.00 |
[Handwritten: ok RS 1-6-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 12/11/2016
| Project: | EGMA1504 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Design & Permitting | ||
| Invoice No: | 726816 | ||
| Invoice Period: | 11/7/2016 | to | 12/11/2016 |
| Initial Authorization: | $ 167,120.00 | Date: | 12/29/2016 |
| Contract Amount: | $ 183,120.00 | ||
| Previously Invoiced: | $ 178,968.00 | ||
| Current Invoice: | $ 1,784.25 | ||
| Invoiced to Date ($): | $ 180,752.25 | ||
| Invoiced to Date (%): | 98.71% | ||
| Remaining Budget ($): | $ 2,367.75 | ||
| Remaining Budget (%): | 1.29% |
Budget by Phase:
| Phase Name: | Permitting | Phase 12 |
|---|---|---|
| Phase Budget: | $ 41,950.25 | |
| Previously Invoiced: | $ 37,798.25 | |
| Current Invoice: | $ 1,784.25 | |
| Invoiced to Date ($): | $ 39,582.50 | |
| Invoiced to Date (%): | 94.36% | |
| Remaining Budget ($): | $ 2,367.75 | |
| Remaining Budget (%): | 5.64% |
Comments: Completed and resubmitted revised NPDES permit plans, Notice of Intent application forms, supporting stormwater calculations, and response letter to CCCD to address their August 19, 2016 NPDES and E&S comments.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 726817 Invoice Date : 12/29/2016 Project : EGMA1601 Project Name : 2016 General Services |
|---|
For Services Rendered through: 12/11/2016
Continued coordination for CIM coating repairs in SBR #3 and concrete repairs throughout deck including site inspection by Senior Engineer and Senior Engineering Technician and follow-up field meeting with Dutchland and Public Works Dept, and scoping and scheduling with Dutchland and the Public Works Dept. Continued feasibility analysis of potential change to automated caustic soda chemical feed for alkalinity/pH control to replace existing manual soda ash feed at RCSTP including trial and permanent conceptual designs and tank sizing, chemical pricing, and overall construction pricing; submitted a draft alternatives memo dated 11/14/16. Prepared for and attended November MA meeting. Submitted marked-up plan of LCSTP to Township identifying earthen areas in need of restoration based upon site visit.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 4,042.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 4,042.50 |
| Amount Due This Invoice | ,042.50 |
|---|
| Fee : | 15,598.75 |
|---|---|
| Prior Billings : | 11,556.25 |
| Current Billings : | 4,042.50 |
| Total Billings : | 15,598.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 13.50 | 115.00 | 1,552.50 |
| Senior Engineer | 18.00 | 110.00 | 1,980.00 |
| Senior Engineering Technician | 6.00 | 85.00 | 510.00 |
| Labor Total: | 37.50 | 4,042.50 |
| Total Phase : **** -- Professional Services | Labor : | ,042.50 |
|---|---|---|
| Expense : | bash.00 | |
| Total Project : EGMA1601 – 2016 General Services | Labor : | ,042.50 |
| Expense : | bash.00 |
[Handwritten: ok RS 1-6-17 (SEE NEXT PAGE)]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1601 Invoice Summary
Invoice Date 12/29/2016
| Project: | EGMA1601 | ||
|---|---|---|---|
| Pennoni Job No.: | 2016 General Services | ||
| Invoice No: | 726817 | ||
| Invoice Period: | 11/7/2016 | to | 12/11/2016 |
| Initial Authorization: | $ 12,300.00 | Date: | 12/29/2016 |
| Contract Amount: | $ 15,598.75 | ||
| Previously Invoiced: | $ 11,556.25 | ||
| Current Invoice: | $ 4,042.50 | ||
| Invoiced to Date ($): | $ 15,598.75 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ - | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | 2016 General Services |
|---|---|
| Phase Budget: | $ 15,598.75 |
| Previously Invoiced: | $ 11,556.25 |
| Current Invoice: | $ 4,042.50 |
| Invoiced to Date ($): | $ 15,598.75 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ - |
| Remaining Budget (%): | 0% |
Comments: Continued coordination for CIM coating repairs in SBR #3 and concrete repairs throughout deck including site inspection by Senior Engineer and Senior Engineering Technician and follow-up field meeting with Dutchland and Public Works Dept, and scoping and scheduling with Dutchland and the Public Works Dept. Continued feasibility analysis of potential change to automated caustic soda chemical feed for alkalinity/pH control to replace existing manual soda ash feed at RCSTP including trial and permanent conceptual designs and tank sizing, chemical pricing, and overall construction pricing; submitted a draft alternatives memo dated 11/14/16. Prepared for and attended November MA meeting. Submitted marked-up plan of LCSTP to Township identifying earthen areas in need of restoration based upon site visit.
[Handwritten: 1-6-17 PENNONI IS $ 298.75 OVER BUDGET AS A RESULT OF ADDITIONAL ISSUES WITH SBR COATINGS. ok with overage Rick]
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 726818 Invoice Date : 12/29/2016 Project : EGMA1602 Project Name : 2016 Semi-Annual I&I Reports |
|---|
For Services Rendered through: 12/11/2016
Analyzed meter data of East Goshen's overall flows from the Chester Creek Service Area for apparent discrepancies between East Goshen's raw meter data, East Goshen's average monthly flow calculations, West Goshen's billing records, and Chapter 94 Reports.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,000.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,000.25 |
| Amount Due This Invoice | ,000.25 |
|---|
| Fee : | 11,200.00 |
|---|---|
| Prior Billings : | 7,739.75 |
| Current Billings : | 1,000.25 |
| Total Billings : | 8,740.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.50 | 115.00 | 172.50 |
| Graduate Engineer | 10.75 | 77.00 | 827.75 |
| Labor Total: | 12.25 | 1,000.25 |
| Total Phase : **** -- Professional Services | Labor : | ,000.25 |
|---|---|---|
| Expense : | bash.00 | |
| Total Project : EGMA1602 – 2016 Semi-Annual I&I Reports | Labor : | ,000.25 |
| Expense : | bash.00 |
[Handwritten: ok RS 1-6-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1602 Invoice Summary
Invoice Date 12/29/2016
| Project: | EGMA1602 | ||
|---|---|---|---|
| Pennoni Job No.: | 2016 Semi-Annual I&I Reports | ||
| Invoice No: | 726818 | ||
| Invoice Period: | 9/17/2016 | to | 12/11/2016 |
| Initial Authorization: | $ 11,200.00 | Date: | 12/29/2016 |
| Contract Amount: | $ 11,200.00 | ||
| Previously Invoiced: | $ 7,739.75 | ||
| Current Invoice: | $ 1,000.25 | ||
| Invoiced to Date ($): | $ 8,740.00 | ||
| Invoiced to Date (%): | 78% | ||
| Remaining Budget ($): | $ 2,460.00 | ||
| Remaining Budget (%): | 22% |
Budget by Phase:
| Phase Name: | 2016 Semi-Annual I&I Reports |
|---|---|
| Phase Budget: | $ 11,200.00 |
| Previously Invoiced: | $ 7,739.75 |
| Current Invoice: | $ 1,000.25 |
| Invoiced to Date ($): | $ 8,740.00 |
| Invoiced to Date (%): | 78% |
| Remaining Budget ($): | $ 2,460.00 |
| Remaining Budget (%): | 22% |
Comments: Analyzed meter data of East Goshen's overall flows from the Chester Creek Service Area for apparent discrepancies between East Goshen's raw meter data, East Goshen's average monthly flow calculations, West Goshen's billing records, and Chapter 94 Reports.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 726819 Invoice Date : 12/29/2016 Project : EGMA1608 Project Name : West Goshen Sewer System Consultati |
|---|
For Services Rendered through: 12/11/2016
Attended first regular West Goshen STP stakeholders' meeting on 11/22/16; follow-up review of WGSA correspondence and meeting documents.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 373.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 373.75 |
| Amount Due This Invoice | 73.75 |
|---|
| Fee : | 5,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 373.75 |
| Total Billings : | 373.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.25 | 115.00 | 373.75 |
| Labor Total: | 3.25 | 373.75 |
| Total Phase : **** -- Professional Services | Labor : | 73.75 |
|---|---|---|
| Expense : | bash.00 | |
| Total Project : EGMA1608 – West Goshen Sewer System Consultati | Labor : | 73.75 |
| Expense : | bash.00 |
[Handwritten: ok RS 1-6-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1608 Invoice Summary
Invoice Date 12/29/2016
| Project: | EGMA1608 | ||
|---|---|---|---|
| Pennoni Job No.: | West Goshen Sewer System Consultation | ||
| Invoice No: | 726819 | ||
| Invoice Period: | NTP | to | 12/11/2016 |
| Initial Authorization: | $ 5,000.00 | Date: | 12/29/2016 |
| Contract Amount: | $ 5,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 373.75 | ||
| Invoiced to Date ($): | $ 373.75 | ||
| Invoiced to Date (%): | 7% | ||
| Remaining Budget ($): | $ 4,626.25 | ||
| Remaining Budget (%): | 93% |
Budget by Phase:
| Phase Name: | West Goshen Sewer System Consultation |
|---|---|
| Phase Budget: | $ 5,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 373.75 |
| Invoiced to Date ($): | $ 373.75 |
| Invoiced to Date (%): | 7% |
| Remaining Budget ($): | $ 4,626.25 |
| Remaining Budget (%): | 93% |
Comments: Attended first regular West Goshen STP stakeholders' meeting on 11/22/16; follow-up review of WGSA correspondence and meeting documents.
[Gawthrop Greenwood, PC Attorneys at Law Logo]
| Gawthrop Greenwood, PC Attorneys at Law 17 East Gay Street, Suite 100 West Chester, PA 19381-0562 gglaw@gawthrop.com |
(p) 610-696-8225 (f) 610-344-0922 www.gawthrop.com |
|---|
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 12/06/2016 Client No: 6604-001R Invoice No. 157998 |
|---|
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 11/09/2016 PMM |
Review and analyze meeting material packet. | 0.40 | |
| 11/14/2016 SLF |
Preparation for and attendance at meeting. | 1.50 | |
| 11/16/2016 PMM |
Emails from M Gordon, C Knauer and R Smith regarding EDU request and sewer easement. | 0.60 | |
| For Current Services Rendered | 2.50 | 500.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Stacey L. Fuller | 1.50 | 00.00 | 00.00 |
| Patrick M. McKenna | 1.00 | 200.00 | 200.00 |
| Total Current Charges | 500.00 |
|---|---|
| Balance Due | 00.00 |
[Handwritten: OK TO PAY RS 12/16]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA December Financial Reports |
| Date: | January 6, 2016 |
In December, the Municipal Authority recorded 56 in interest income and 8,604 in expenses, for a negative variance of 8,178. Expenses consisted of:
- ,377 for the 4 th quarter administrative charge-back
- ,012 for engineering services
- 00 for legal services
- ,622 for the Reservoir Road Pump Station engineering
- 8,092 for 28% of the debt service on the 1998 note
As of November 30th, the fund balance was ,415.,651, of which ,373,851 is in the main construction account (most of which represents the 2013 note).
A complete list of all year-to-date expenses and revenues is provided.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
December 2016
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 1,453,798.13 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 1,500.00 | 454.45 | 2,572.61 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 1,500.00 | 454.45 | 2,572.61 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO SEWER SINKING FUND | 07492 0550 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | 1,500.00 | 454.45 | 2,572.61 | |
| U:\bmccool\2016\Municipal Authority\2016 - 12 - Municipal Authority Report.xlsx | Page 1 of 3 | 01/06/2017 |
|---|
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
December 2016
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 10.00 | 1.54 | (27.66) |
| C.C. TAPPING FEES | 07364 1100 | 4,000.00 | 0.00 | 6,000.00 |
| R.C.TAPPING FEES | 07364 1110 | 4,000.00 | 0.00 | 43,300.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 1,127.52 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0.00 | 0.00 | 564.48 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 93,832.00 | 0.00 | 77,000.00 |
| TOTAL REVENUE | 101,842.00 | 1.54 | 127,964.34 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 0.00 | 7,377.37 | 30,165.72 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 3,000.00 | 0.00 | 1,741.62 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,500.00 | 0.00 | 8,900.00 |
| ENGINEERING SERVICES | 07424 3130 | 38,500.00 | 1,012.00 | 54,100.00 |
| LEGAL SERVICES | 07424 3140 | 9,000.00 | 500.00 | 8,592.79 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 24,920.00 | 24,921.00 | 24,921.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 3,172.00 | 3,171.00 | 3,171.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 88,092.00 | 36,981.37 | 131,592.13 | |
| OPERATING NET RESULT | 13,750.00 | (36,979.83) | (3,627.79) | |
| U:\bmccool\2016\Municipal Authority\2016 - 12 - Municipal Authority Report.xlsx | Page 2 of 3 | 01/06/2017 |
|---|
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
December 2016
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 0.00 | 0.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 0.00 | 0.00 | 0.00 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 0.00 | 0.00 | 0.00 |
| MANHOLE COVER REPLACEMENTS | 07424.7405 | 0.00 | 0.00 | 0.00 |
| C.C. CAPITAL - COLLECTION | 07424.7420 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0.00 | 1,622.25 | 44,570.50 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| ASBSTOS CONCRETE ENGINEERING | 07429 3130 | 25,000.00 | 0.00 | 0.00 |
| DIVERSION PROJ.- LEGAL | 07429 3166 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 25,000.00 | 1,622.25 | 44,570.50 | |
| CAPITAL NET RESULT | (25,000.00) | (1,622.25) | (44,570.50) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 1,415,650.50 | |||
| U:\bmccool\2016\Municipal Authority\2016 - 12 - Municipal Authority Report.xlsx | Page 3 of 3 | 01/06/2017 |
|---|
[The Authorities PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION Logo]
FYI
1000 North Front Street, Suite 401
Wormleysburg, PA 17043
717-737-7655 • 717-737-8431(fax)
info@municipalauthorities.org
www.municipalauthorities.org
[Stamp: RECEIVED DEC 09 2016 BY _____]
| TO: | Association Members |
|---|---|
| FROM: | Matthew Cranmer, Conference Chair Douglas E. Bilheimer, Executive Director |
| DATE: | December 7, 2016 |
| SUBJECT: | 2017 PMAA Annual Conference |
Call for Papers/Session Topics
As PMAA begins planning for the 2017 Annual Conference (September 10-13, Hershey) we are asking you, the members, for your suggestions and possibly expertise for session presentations to the conference delegates.
As authorities, you may have recently completed a project or administrative program that has made your authority more efficient or operationally advanced. As PMAA members, sharing your experiences is part of the benefits of Association participation. If you are an authority simply looking for guidance in a certain area of operations or management, please use this opportunity to express your interest in a topic.
Associate members, PMAA has relied on your expertise in educating our membership at countless seminars and conferences. PMAA prides itself in providing the premier industry forum for networking and information exchange. If you or your firm has a particular area of expertise, an interesting case study or a suggestion for conference educational session, please share your idea with the Conference Committee using the form below.
Please complete the form below with your suggestions or proposals. The Conference Committee will be provided with a complete listing of your educational session ideas. Submitted ideas not chosen for the 2017 Conference will be maintained and may be utilized at other educational sessions.
Forms must be completed and returned no later than Friday, January 20, 2017. This form can be faxed to the PMAA office at 717-737-8431 or e-mailed to albright@municipalauthorities.org
Contact Person: ____________________________________ E-mail: ____________________________________
Authority/Firm: _________________________________________________________________________________
Address: ___________________________________________ City, State, Zip: ___________________________
Phone: _____________________________________________ Fax: _______________________________________
Topic/Title: ____________________________________________________________________________________
Have you previously presented this topic? □ Yes □ No
If yes, could you provide a reference from that presentation? _________________________________________
Topic Summary (2 or 3 sentence overview, use back of paper or an additional sheet if more room is needed):
□ Yes, our Authority/Firm would present a session or portion of a session relating to the above-mentioned topic.
□ This topic could also be presented in a webinar format of 45 – 60 minutes.
□ This topic could also be prepared as an article for The Authority magazine.
□ We would suggest the Association provide an educational session/webinar on the above-mentioned topic.
[The Authorities PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION Logo]
FYI
1000 North Front Street • Suite 401 • Wormleysburg, PA 17043 • 717.737.7655 • Fax 717.737.8431
Email: info@municipalauthorities.org Website: www.municipalauthorities.org
[Stamp: RECEIVED DEC 19 2016 BY _____]
| TO: | PMAA MEMBER AUTHORITIES |
|---|---|
| FROM: | DOUGLAS E. BILHEIMER, EXECUTIVE DIRECTOR |
| DATE: | DECEMBER 15, 2016 |
| SUBJECT: | 2017 ROSTER SHEET |
We have enclosed our newly designed Roster Sheet for 2017. Please review this form and make changes as outlined below. Return the original corrected copy to the PMAA office as soon as possible.
Please Note: This print-out may contain typographical errors. Please check all information very closely and correct as required. Print corrections legibly, using red or bright ink (no pencil). PLEASE BE ACCURATE. This information is essential for printing the 2018 Directory, to assure correct addresses for mailings, and processing of membership dues.
PAGE 1
Section 1: Authority Information:
Authority facts: name, address, phone, fax, e-mail, website, type of project, type of authority.
Section 2: Revenue Information:
For OPERATING Authorities – Gross Revenues. Revise the gross revenue figure, and indicate the gross revenues for the authority's last completed fiscal year.
For LEASE-BACK Authorities – Leaseback Revenue – Revise the annual lease rental figure, and indicate the lease rental figure for the authority's last completed fiscal year.
If your authority is a COMBINATION Authority, with both Gross Revenues and Lease-Back Rentals, provide both figures in the appropriate spaces.
Section 3: The Authority Participates in these PMAA Programs:
Verify all the PMAA programs your Authority currently participates in.
Section 4: Staff Information:
Revise any changes in the number of employees and board members.
Question: Do you have an Insurance Broker? If yes, please provide details.
(over)
[The Authorities PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION Logo]
1000 North Front Street, Suite 401
Wormleysburg, PA 17043
717.737.7655 | 717.737.8431(fax)
info@municipalauthorities.org
www.municipalauthorities.org
MEMBERSHIP ROSTER FOR 2017
Please verify that this information is correct and make any necessary changes in the space provided on the right.
Authority Information:
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
Telephone: (610) 692-7171
Fax: (610) 692-8950
Email: egtadmin@eastgoshen.org
Website: www.eastgoshen.org
Type of Project: Sewer
Type of Authority: Leaseback
Revenue Information:
(Please provide gross revenue or lease rental figures for the past fiscal year)
| Information | Current Value | Change: |
|---|---|---|
| Gross Revenues: (Total from service charges if an Operating Authority) |
bash.00 | |
| Fiscal Year Ends: | December 31 | |
| Leaseback Revenue: (If Project is a Leaseback Authority) |
84,300.00 | |
| Bonded Debt: | 0,177,000.00 |
The Authority Participates in these PMAA Programs:
| Program | Status | Change: |
|---|---|---|
| Life Insurance: | No | |
| Short Term Disability: | No | |
| Long Term Disability: | No | |
| Hospital Indemnity: | No | |
| Unemployment Compensation: | No |
Staff Information:
| Category | Count | Change: |
|---|---|---|
| Number of Full-Time Employees: | 0 | |
| Number of Part-Time Employees: | 0 | |
| Number Covered by Collective Bargaining: | 0 | |
| Number of Board Members: | 5 |
Do you have an insurance broker? If yes, please provide contact information: Yes □ No □
Name: ____________________ Company: ____________________ Phone: ____________________
ID: 212 | East Goshen Municipal Authority | Chester County | Region: 1 | Page 1
[The Authorities PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION Logo]
1000 North Front Street, Suite 401
Wormleysburg, PA 17043
717.737.7655 | 717.737.8431(fax)
info@municipalauthorities.org
www.municipalauthorities.org
Please verify that the information below is correct and make any changes or additions in the space provided.
Manager: Louis F. Smith
1580 Paoli Pike, West Chester, PA 19380
Phone: (610) 692-7171 | Email: rsmith@eastgoshen.org
Director or Public Works: Mark S. Miller
1580 Paoli Pike, West Chester, PA 19380
Phone: (610) 692-7171 | Email: mmiller@eastgoshen.org
Chair: Dana Pizarro,
301 East Germantown Pike, 3rd Floor, East Norriton, PA 19401
Phone: (484) 804-7254 | Email: dana.pizarro@obg.com
Vice Chair: Ed McAssey
1121 Merrifield Drive, West Chester, PA 19380
Phone: (610) 692-7171 | Email:
Assistant Secretary/Treasurer: Phil Mayer
922 Saratoga Drive, West Chester, PA 19380
Phone: (610) 692-7171 | Email:
Secretary: Jack Yahraes
911 Vista Drive, West Chester, PA 19380
Phone: (610) 692-2285 | Email: jyahraes@aol.com
Treasurer: Kevin Cummings
1606 Williams Way, West Chester, PA 19380
Phone: (610) 563-8893 | Email: kcummings@aol.com
Solicitor: Gawthrop Greenwood, PC/Patrick McKenna, Esquire
17 East Gay Street, Suite 100, PO Box 562, West Chester, PA 19381-0562
Phone: (610) 696-8225 | Email: pmckenna@gawthrop.com
Engineer: Pennoni Associates, Inc./Michael Ellis, PE
121 Contental Drive, Suite 207, Newark, DE 19713
Phone: (302) 655-4451 | Email:
Auditor: Maillie LLP
140 Whitaker Avenue, PO Box 680, Oaks, PA 19456
Phone: (610) 935-1420 | Email: firm@maillie.com