Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 13, 2017
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report
- APPROVAL OF MINUTES January 9, 2017
- APPROVAL OF INVOICES a. Pennoni Invoice #731599 $1,422.75 b. Pennoni Invoice #731600 $ 199.75 c. Pennoni Invoice #731601 $ 796.75 d. Pennoni Invoice #731602 $ 563.00 e. Pennoni Invoice #731603 $ 484.50 f. Gawthrop Invoice #175775 $ 940.00 already paid g. Gawthrop Invoice #177124 $ 597.50
- LIAISON REPORTS
- FINANCIAL REPORTS January Financial Report
- OLD BUSINESS
- GOALS Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, February, March, April, May, June, July, August, September, October, November, December; Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively “I&I”) Plan to reduce the amount of I&I into the sewer system.
F:\Data\Shared Data\Agendas\Municipal Authority\2017\2-13-2017 -.doc
- Respond to capacity requests within 45 days. 943 Cornwallis Drive, 1420 East Strasburg Road (3 EDUs), 1329 North Chester Road, 1631 Hunter Circle, 411 Misak Drive
- Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. Currently under review by staff.
- Submit topical articles of interest for the East Goshen newsletter. Winter, Summer,
- Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March, May, June, July, August, September, October, November, December. January 2017
- NEW BUSINESS RCSTP Alkalinity Chemical Feed Alternatives
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2017\2-13-2017 -.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 8, 2017
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | January 2017 Monthly Report |
Monthly Flows: The average daily flow to West Goshen was 768,000 gallons per day. No problems to report.
Meters: All meters were read on a daily basis. The temporary meters are being read on a by-weekly basis with no problems to report.
C.C. Collection: The pumping stations were visited on a daily basis with no problems to report. Routine maintenance was performed.
In December I met with the Homeowners Association from Steeple Chase who informed me that they were planning an extension paving project in both complexes.
I offered to televise their sanitary sewer system since they have had some problems in the past. We televised their system; we did 3000 LF and marked all laterals. We located a couple of main problems which they have agreed to repair. They will also clean all the lines.
We did repairs to every lateral, 79 total and replaced new caps and vent caps. I also asked that they have the contractor replace all the castings and lids (26) which we will supply.
With the repairs made to the laterals, I feel we eliminated a significant amount of inflow during wet weather amounts.
We did GPS on all the manholes and we will also add that information to our system.
We repaired a sewer lateral on Gateswood Drive that was loaded with tree roots.
We have two main repairs to do off of Reservoir Road. We were waiting for the ground to freeze however; I don’t think that will be happening anytime soon.
R.C. Collection: Pump Stations were visited on a daily basis, routine maintenance was performed.
R.C. Plant: No problems to report for the month.
Alarms: We responded to 21 alarms for January.
PA One Calls: We received 46 PA One calls January.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
February 10, 2017
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- The NPDES Permit expires on February 28, 2017. The permit renewal application was finalized and submitted to PADEP on August 31, 2016. No changes to the existing permit are proposed. (No update since last report).
- We continued the evaluation of alternatives for automated alkalinity chemical feed systems to eliminate manual feeding and carrying soda ash bags up the exterior steps, including tank sizing and chemical cost analyses, and coordination with the operator. The material cost for a change to caustic soda would be roughly 50%-60% the current soda ash cost, approximately $20,000/year more. An updated DRAFT report is attached with details on a change to caustic soda treatment. However, the operator is recommending further consideration of magnesium hydroxide instead of caustic, as well as a change to the phosphorus treatment, from alum to polyaluminum chloride (PaCl). The alum change would likely decrease the alkalinity treatment demands. We will discuss in more detail at the February MA meeting.
- Dutchland repaired the peeling CIM coating at the top of the SBR #1 tank. We met with Dutchland and the CIM manufacturer at the plant thereafter regarding the progressive deterioration of the coatings and rehabilitation vs. replacement approaches for all the tanks. We expect feedback from the manufacturer within the next 1-2 weeks.
Reservoir Road Pump Station
- PADEP issued the State Water Obstruction and Encroachment Permit for the pump station site and Chester Creek utility crossing in June 2016; however, they are requiring a separate federal authorization by the Army Corps of Engineers (ACOE). We coordinated with both PADEP and ACOE on this additional review in July and are still awaiting feedback. (No update since last report).
- We revised the NPDES plans and permit application again to address two new minor comments from CCCD that they issued on December 19, 2016, and we resubmitted to CCCD on December 22, 2016. (No update since last report).
- The Water Quality Management (WQM) Permit application was submitted to PADEP on April 13, 2016. They have informally notified us that they have no comments and are prepared to issue the WQM Permit once the aforementioned NPDES Permit is issued. (No update since last report).
- We previously prepared the front end of the bid document and Division 01 specification sections, including a draft Bid Form. The Bid Form needs to be finalized. Technical specifications were already prepared as part of the WQM Permit application. The full bid document will be completed, assembled, and forwarded to the Township upon receipt of the three remaining permits. (No update since last report).
EGMA1701
East Goshen Municipal Authority
February 10, 2017
Page 2
Engineer’S Report
- We will complete a listing of the permits, expiration dates, and renewal deadlines once the three remaining permits are issued. We anticipate including that listing in future Engineer’s Reports to track the permit statuses. (No update since last report).
RCSTP and Pump Stations’ O&M Manual
- Edits were made to address comments from the PW Director.
White Chimneys Manhole Replacement
- We will provide assistance as requested by the Township during construction.
Semi-Annual I&I Reports
- We previously evaluated apparent inconsistencies in the overall Chester Creek subbasin flows (as metered at the Westtown Way meter) between meter data, averages provided by East Goshen, and billing records from West Goshen, and we will discuss with the PW Department to resolve.
- We also began analysis of permanent and portable flow meter data for the upcoming first 2017 semi-annual report including an analysis of sewer billing EDUs by subbasin and conversion of our prior sewer system maps into GIS to facilitate the analyses.
Sunoco Pipeline
- Sunoco previously agreed to add a condition to the approval letter they are requesting from East Goshen that they (Sunoco) will physically locate the Ashbridge PS force main at the proposed pipeline crossing location and that an East Goshen representative must be present when any work is done near the force main. We had also coordinated with them on a potential conflict with the proposed Reservoir Road PS force main, but there has not yet been a resolution to our knowledge. (No update since last report).
New Connections
- 1420 E. Strasburg Road, Brakman Property – We reviewed a revised design submission for the 3-lot subdivision and provided sanitary sewer comments. The applicant now proposes 2 gravity sewer laterals and 1 grinder pump instead of the 3-grinder pump system that was originally proposed.
- 1680 E. Boot Road, Knauer Property – We reviewed a revised design submission for the 2 proposed gravity sewer laterals and provided two remaining sanitary sewer comments.
DCED Small Water & Sewer Program Grant
- The Township submitted a grant application for the installation of three permanent gravity sewer flow meters in October. The grant agency, the Commonwealth Financing Authority, is scheduled to award grants in March 2017. (No update since last report).
West Goshen Sewer System Consultation
- No activity since last report.
P:\Projects\EGMA\Memos to Board\2017\Engineers Report 2017-02-10.docx
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during December 2016. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. Completed preparations to remove SBR 1 from service and place SBR 3 in service. No mechanical or operational issues were observed during operation of sludge dewatering equipment.
Treatment Process Operation
During December 2016, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected on average twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average had a concentration of 0.27 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the December 2016 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.23 to 0.33 mg/L.
Table 1
December 2016 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total, mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Sample Date | Instantaneous Maximum | 40 | 42 | ||||||||
| December 1, 2016 | 0.359 | 5 | 15.0 | ||||||||
| December 6, 2016 | 0.346 | 3.0 | 8.7 | 4 | 11.5 | 0.197 | 0.57 | 0.27 | 0.78 | 3 | 0.4771 |
| December 8, 2016 | 0.318 | 3 | 8.0 | ||||||||
| December 13, 2016 | 0.309 | 2.0 | 5.2 | 4 | 10.3 | 3.470 | 8.94 | 0.23 | 0.59 | 1 | 0.0000 |
| December 15, 2016 | 0.362 | 2 | 6.0 | ||||||||
| December 20, 2016 | 0.359 | 5.5 | 16.5 | 4 | 12.0 | 0.701 | 2.10 | 0.33 | 0.99 | 2 | 0.3010 |
| December 22, 2016 | 0.372 | 3 | 9.3 | ||||||||
| December 27, 2016 | 0.341 | 5.3 | 15.1 | 5 | 14.2 | 0.714 | 2.03 | 0.25 | 0.71 | 4 | 0.6021 |
| December 29, 2016 | 0.340 | 4 | 11.3 | ||||||||
| Average | 0.345 | 4.0 | 11.3 | 4 | 10.9 | 1.27 | 3.41 | 0.27 | 0.77 | 2 | 0.3451 |
| Minimum | 0.309 | 2.0 | 5.2 | 2 | 6.0 | 0.20 | 0.57 | 0.23 | 0.59 | 1 | 0.0000 |
| Maximum | 0.372 | 5.5 | 16.5 | 5 | 15.0 | 3.47 | 8.94 | 0.33 | 0.99 | 4 | 0.6021 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 7
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Discharge to Applebrook, Outfall 002, remained discontinued during December and will remain off line until the spring of 2017
Table 2 illustrates the influent composite sample data reported for the December 2016.
Table 2
December 2016 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| December 6, 2016 | 0.470 | 101 | 396 | 166 | 651 | 49.0 | 192 | 56.9 | 223 | 6.1 | 24 |
| December 13, 2016 | 0.391 | 91.2 | 357 | 40 | 157 | 44.7 | 175 | 44.8 | 146 | 5.2 | 20 |
| December 20, 2016 | 0.423 | 85.5 | 335 | 144 | 564 | 45.7 | 179 | 52.1 | 184 | 5.1 | 20 |
| December 27, 2016 | 0.459 | 139 | 545 | 240 | 941 | 53.9 | 211 | 64.7 | 248 | 5.3 | 21 |
| Average | 0.436 | 104 | 408 | 148 | 578 | 48.3 | 189 | 54.6 | 200 | 5.4 | 21 |
| Minimum | 0.391 | 86 | 335 | 40 | 157 | 44.7 | 175 | 44.8 | 146 | 5.1 | 20 |
| Maximum | 0.470 | 139 | 545 | 240 | 941 | 53.9 | 211 | 64.7 | 248 | 6.1 | 24 |
Table 3 presents the available Outfall 001 final effluent data for the month of January 2017. During January, the presence of foam conditions on the surface of the SBRs began to increase with foam concentrations ranging from 80% to 100% of the area.
During January, additional TSS and total phosphorus samples were collected. Several final effluent pollutant concentrations were elevated during the month; however, there are no anticipated exceedances of the permitted limitations for Outfall 001. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 7
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Table 3
January 2017 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total, mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Sample Date | Instantaneous Maximum | 40 | 42 | ||||||||
| January 3, 2017 | 0.390 | 5.90 | 19.2 | 12 | 39.0 | 0.761 | 2.48 | 0.44 | 1.43 | 210 | 2.3222 |
| January 5, 2017 | 0.351 | 6 | 17.6 | ||||||||
| January 10, 2017 | 0.333 | 11.1 | 30.8 | 24 | 66.7 | 7.88 | 21.88 | 1.10 | 3.05 | 6 | 0.7782 |
| January 11, 2017 | 0.342 | 11 | 31.4 | ||||||||
| January 12, 2017 | 0.325 | 12 | 32.5 | ||||||||
| January 17, 2017 | 0.333 | 7.2 | 20.0 | 12 | 33.3 | 9.82 | 27.27 | 0.36 | 1.00 | 4 | 0.6021 |
| January 19, 2017 | 0.338 | 6 | 16.9 | ||||||||
| January 23, 2017 | 0.390 | 0.20 | 0.65 | ||||||||
| January 24, 2017 | 0.379 | 2.9 | 9.2 | 9 | 28.4 | 3.05 | 9.64 | 0.27 | 0.85 | 15 | 1.1761 |
| January 25, 2017 | 0.335 | 0.26 | 0.73 | ||||||||
| January 26, 2017 | 0.309 | 7 | 18.0 | 0.17 | 0.44 | ||||||
| January 27, 2017 | 0.319 | 0.17 | 0.45 | ||||||||
| January 28, 2017 | 0.330 | 0.16 | 0.44 | ||||||||
| January 29, 2017 | 0.391 | 0.28 | 0.91 | ||||||||
| January 30, 2017 | 0.347 | 4 | 11.6 | 0.17 | 0.49 | ||||||
| January 31, 2017 | 0.344 | 5 | 14.3 | 0.20 | 0.57 | ||||||
| Average | 0.347 | 6.8 | 19.8 | 10 | 28.2 | 5.38 | 15.32 | 0.32 | 0.92 | 17 | 1.2196 |
| Minimum | 0.309 | 2.9 | 9.2 | 4 | 11.6 | 0.76 | 2.48 | 0.16 | 0.44 | 4 | 0.6021 |
| Maximum | 0.391 | 11.1 | 30.8 | 24 | 66.7 | 9.82 | 27.27 | 1.10 | 3.05 | 210 | 2.3222 |
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during January 2017.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 7
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Table 4
January 2017 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| January 3, 2017 | 0.520 | 155 | 672 | 124 | 538 | 58.2 | 252 | 52.4 | 227 | 5 | 22 |
| January 10, 2017 | 0.398 | 181 | 785 | 218 | 946 | 44.8 | 194 | 52.6 | 175 | 5.5 | 24 |
| January 17, 2017 | 0.424 | 204 | 885 | 262 | 1,136 | 52.2 | 226 | 55.4 | 196 | 6.4 | 28 |
| January 24, 2017 | 0.474 | 168 | 729 | 110 | 477 | 42.4 | 184 | 47.7 | 189 | 4.0 | 17 |
| January 31, 2017 | 0.383 | ||||||||||
| Average | 0.440 | 177 | 768 | 179 | 774 | 49.4 | 214 | 52.0 | 197 | 5.2 | 23 |
| Minimum | 0.383 | 155 | 672 | 110 | 477 | 42.4 | 184 | 47.7 | 175 | 4.0 | 17 |
| Maximum | 0.520 | 204 | 885 | 262 | 1136 | 58.2 | 252 | 55.4 | 227 | 6.4 | 28 |
Sequencing batch reactors (SBRs) numbered 1, 2 and 4 were in service during December. SBRs 2, 3 and 4 were in service during January. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs increased to from 61.6 gpd to 92.9 gpd. Soda ash daily addition decreased from 421 lbs./day to 377 lbs./day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
On January 13th, SBR No. 3 was placed in service as a treatment unit.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 7
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Solids Dewatering and Disposal: January 2017
| Sludge Dewatering Summary | |
|---|---|
| Gallons of sludge dewatered | 289,178 |
| Number of dumpsters | 4 |
*Nineteen (19) days of centrifuge operation
Flow data:
| Flow Meter Location | January 2017 | ||
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd | |
| Influent Wastewater to Screening Building* | 13.489 | 435,113 | 556,290 |
| Influent Wastewater to SBRs | 14.006 | 451,793 | 557,132 |
| Internal Recycle | 0.614 | 22,118 | 82,952 |
| Treated Effluent to Disc Filters | 13.858 | 447,040 | 545,792 |
| Final Effluent Discharge | 11.090 | 357,742 | 480,000 |
| Applebrook Golf Course | No Discharge | No Discharge | No Discharge |
Chemical Usage:
| Chemical | January 2017 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 377 | 11,350 |
| Aluminum Sulfate solution | 92.9 | 2,879 |
| Polymer (centrifuge) | 0.84 | |
*Nineteen (19) days of centrifuge operation
During January, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank No. 1 was in service. The level at the beginning of the month was 12.62 feet and the level at the end of the month was 9.58 feet. Zero (0) gallons of supernatant were decanted during the month. Zero (0) pounds of soda ash were added. The average pH concentration was measured as 6.51 S.U. average total alkalinity measured as 250 mg/l and average total solids concentration measured as 1.05%.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 7
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Sludge holding tank No. 2 was in service. The level at the beginning of the month was 11.03 feet and the level at the end of the month was 12.33 feet. Zero (0) gallons of supernatant were decanted during the month. Zero (0) pounds of soda ash were added. The average pH concentration was measured as 6.37 S.U., average total alkalinity measured as 300 mg/l and average total solids concentration measured as 0.79%.
PA DEP
No activity
Significant Storm/Hydraulic Loading Events
During January, there were a total of twenty (20) days were a trace of precipitation of snow was recorded at the facility. There were three (3) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24 hour period. A total of 3.66 inches of rainfall and 3 inches of snow were measured during the month. These events occurred on:
- January 3 rd : 0.57 inches
- January 17 th : 0.76 inches
- January 23 rd : 0.76 inches
There several days during the month where daily precipitation was recorded on consecutive days. Those periods of consecutive days of precipitation are as follows:
January 1st through the 3rd for a total of 0.91 inches
January 10th through the 12th for a total of 0.50 inches
January 19th through the 28th for a total of 1.47 inches
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times. The facility experienced several filled decant cycles during the rain events.
Minor Repairs and Preventative Maintenance
January 2nd & 3rd Observed white “greasy substance” on the disc filters.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 7
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2017
Minor Repairs and Preventative Maintenance (Continued)
- January 3 rd through 23 rd : Daily drained and cleaned both disc filters.
- January 10 th : SBR 4 motive pump was observed to be air bound. Township staff assisted with torch to unfreeze aeration tank valve to unbound the motive pump.
- January 11 th : Chemical delivery arrived.
- January 13 th : Removed SBR 1 from service. Placed SBR 3 in service.
- January 14 th : Respond to SBR 3 motive pump high temperature alarm.
- January 15 th : Rewire SBR 3 motive pump. Install DO caps and calibrate DO sensors for SBRs 2, 3 and 4.
- January 16 th : Adjusted process controls for SBR 2 to increase the hours of aeration for SBR.
- January 23 rd : Dutchland staff installed the motive and sludge pumps for SBR 3. Power failure around 10:00 AM. Emergency generator operated for approximately 30 minutes.
- January 29 th : Emergency repair for SBR 3 final effluent actuator. Tri-State Technician was called out to repair actuator. Key way in actuator was split. The actuator was repaired and returned to service.
- January 31 st : Chemical delivery arrived.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 7
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
January 9, 2017
The East Goshen Township Municipal Authority held their regular public meeting on Monday, January 9, 2017 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Ed McAssey, Dana Pizarro, Jack Yahraes, and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Supervisor), Mike Ellis (Pennoni), Patrick McKenna, Attorney, and Walter Wujcik, Conservancy Board.
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Ed called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
There was a moment of silence to remember our troops and first responders.
Ed asked if anyone would be recording the meeting. There was no response.
Sewer Reports
1. Director of Public Works, Mark Miller provided the following report for December:
Monthly Flows: The average daily flow to West Goshen was 689,000 gallons per day.
Meters: The meters were read on a daily basis. The portable meters were read on a bi-weekly basis.
C.C. Collection: Pump stations were visited on a daily basis. The Barkway Pump Station wet well was cleaned and vacuumed out due to heavy grease build up. We located and repaired two lateral breaks, both were on Meadow Drive, each was allowing approx. 15,000 to 20,000 gallons per day. We also located a line break on Bramble Lane. This should be repaired next week. We televised 36,000 LF of pipe in quadrant 3. We also replaced 12 sewer caps.
R.C. Collection – We visited the pump station on a daily basis. We installed 12 charcoal inserts on Cornwallis Drive to control odors. We are gearing up to clean the sewer right-of-way behind the homes in Hershey Mill Estates.
R.C. Plant: We completed the soda ash storage building with the exception of the vinyl siding. We trenched in conduit for the sampler.
Alarms: We responded to 23 alarms for December.
PA One Calls: We received 64 PA One calls for December.
MA 1-9-17 draft 1
2. Pennoni Engineer’s Report for November
Mike Ellis provided the following report.
Invoices: Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP):
- The NPDES Permit expires on February 28, 2017. The permit renewal application was finalized and submitted to PADEP on August 31, 2016. No changes to the existing permit are proposed. (No update since last report)
- We continued the evaluation of alternatives for automated alkalinity chemical feed systems to eliminate manual feeding and carrying bags up the exterior steps, including tank sizing and chemical cost analyses. The preferred alternative is a change to caustic soda from the current soda ash treatment. We are coordinating feasibility and details with the operator and will provide an up dated letter report by the February MA meeting.
- Dutchland repaired the additional bubbles in the SBR #3 CIM coating that were identified lower on the walls after repairing the peeling coating at the top. It is our understanding that the tank has been refilled and is back in use.
Reservoir Rd Pump Station:
- PADEP issued the State Water Obstruction and Encroachment Permit for the pump station site and Chester Creek utility crossing in June 2016; however, they are requiring a separate federal authorization by the Army Corps of Engineers (ACOE). We coordinated with both PADEP and ACOE on this additional review in July and are still awaiting feedback. (No update since last report)
- We revised the NPDES plans and permit application again to address two new minor comments from CCCD that they issued on December 19, 2016, and we resubmitted to CCCD on December 22, 2016.
- The Water Quality Management (WQM) Permit application was submitted to PADEP on April 13, 2016. They have informally notified us that they have no comments and are prepared to issue the WQM Permit once the aforementioned NPDES Permit is issued. (No update since last report)
- We previously prepared the front end of the bid document and Division 01 specification sections, including a draft Bid Form. The Bid Form still needs to be finalized. Technical specifications were already prepared as part of the WQM Permit application. The full bid document will be completed, assembled, and forwarded to the Township upon receipt of the three remaining permits. (No update since last report)
- We will complete a listing of the permits, expiration dates, and renewal deadlines once the three remaining permits are issued. We anticipate including that listing in future Engineer’s Reports to track the permit statuses. (No update since last report)
RCSTP and Pump Stations’ O&M Manual
No update since last report.
White Chimneys Manhole Replacement
We will provide assistance as requested by the Township during construction.
Semi-Annual I&I Reports
We previously evaluated apparent inconsistencies in the overall Chester Creek subbasin flows (as metered at the Westtown Way Meter) between meter data, averages provided by East Goshen and billing records from West Goshen, and we will discuss with the PW Department to resolve.
MA 1-9-17 draft 2
Sunoco Pipeline
Sunoco previously agreed to add a condition to the approval letter they are requesting from East Goshen that they (Sunoco) will physically locate the Ashbridge PS force main at the proposed pipeline crossing location and that an East Goshen representative must be present when any work is done near the force main. We have also coordinated with them on a potential conflict with the proposed Reservoir Road PS force main, but there has not yet been a resolution to our knowledge. (No update since last report)
New Connections
1420 E. Strasburg Road, Brakman Property – A 3-lot grinder pump system is proposed. We attended a review meeting with the developer, Township staff, and design consultant on December 14, 2016. We are awaiting a revised design submission to address sanitary sewer comments.
1680 E. Boot Road, Knauer Property – We issued comments on the proposed gravity sewer laterals on December 14, 206.
DCED Small Water & Sewer Program Grant
The Township submitted a grant application for the installation of three permanent gravity sewer flow meters in October. The grant agency, the Commonwealth Financing Authority, is scheduled to award grants in March 2017. (No update since last report.)
West Goshen Sewer System Consultation
No activity since last report.
3. Big Fish Environmental Services – Scott’s report for December showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during November 2016. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. Repairs to SBR 3 were completed during December. Repairs to the alum feed pumps to the SBRs were completed during the month. No mechanical or operational issues were observed during operation of sludge dewatering equipment.
Approval of Minutes
The minutes of the December 12, 2016 were approved as amended.
Approval of Invoices
1. Dana moved to approve payment of the following Pennoni invoices:
a. Pennoni #726816 $1,784.42
b. Pennoni #726817 $4,042.50
c. Pennoni #726818 $1,000.25
d. Pennoni #726819 $ 373.75
Kevin seconded the motion. The motion passed unanimously.
2. Jack moved to approve payment of the following Gawthrop invoice:
a. Gawthrop Invoice #157998 $500.00 (already paid)
Dana seconded the motion. The motion passed unanimously.
MA 1-9-17 draft 3
Liaison Report
Conservancy Board – Walter reported that the second planting along E. Boot Road was done in December. Keep East Goshen Beautiful Day will be held on Saturday, April 22, 2017, which is Earth Day.
Board of Supervisors – Carmen mentioned that Senya resigned. Applications should be sent to Rick Smith by January 13, 2017. Interviews will be done at a public meeting. Although this is to fill a term which will end soon, it is expected that the person will run for reelection.
Financial Reports
Jon Altshul provided the following written report:
In December 2016, the Municipal Authority recorded $456 in interest income and $38,604 in expenses, for a negative variance of $38,178. Expenses consisted of:
- $7,377 for the 4 th quarter administrative charge-back
- $1,012 for engineering services
- $500 for legal services
- $1,622 for the Reservoir Road Pump Station engineering
- $28,092 for 28% of the debt service on the 1998 note
As of November 30th, the fund balance was $1,415,651, of which $1,373,851 is in the main construction account (most of which represents the 2013 note).
Goals
Goals for 2017 were reviewed.
New Business
West Goshen Sewer Authority - Ed reported that he attended the meeting last week. Items covered were:
- EPA moved things back 60 days
- Emergency generator is on site but not installed yet
- $17 million bond issue would cover costs for 2017 – 2020
- Review of lease agreements pending
Dana and Kevin will attend the February 1, 2017 meeting.
Adjournment
There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. The meeting was adjourned at 8:00 pm. The next meeting will be held on Monday, February 13, 2017 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 1-9-17 draft 4
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 731599
Invoice Date : 01/27/2017
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting
For Services Rendered through: 1/15/2017
Prepared and resubmitted revised NPDES permit plans, Notice of Intent application forms,and response letter to CCCD to address their December 19, 2016 comments.
Phase : 12 -- Permitting
Total Phase : 12 -- Permitting
| Labor : | 1,422.75 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 1,422.75 |
Amount Due This Invoice: $1,422.75
Phase : 12 -- Permitting
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.50 | 115.00 | 402.50 |
| Graduate Engineer | 13.25 | 77.00 | 1,020.25 |
| Labor Total: | 16.75 | 1,422.75 |
Total Phase : 12 -- Permitting
| Labor : | $1,422.75 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1504 – Reservoir Rd PS Design & Permitting
| Labor : | $1,422.75 |
|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 2-10-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 1/27/2017
| Project: | EGMA1504 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Design & Permitting | ||
| Invoice No: | 731599 | ||
| Invoice Period: | 12/12/2016 | to | 01/15/207 |
| Initial Authorization: | $ 167,120.00 | Date: | 1/27/2017 |
| Contract Amount: | $ 183,120.00 | ||
| Previously Invoiced: | $ 180,752.25 | ||
| Current Invoice: | $ 1,422.75 | ||
| Invoiced to Date ($): | $ 182,175.00 | ||
| Invoiced to Date (%): | 99.48% | ||
| Remaining Budget ($): | $ 945.00 | ||
| Remaining Budget (%): | 0.52% |
Budget by Phase:
| Phase Name: | Permitting | Phase 12 |
|---|---|---|
| Phase Budget: | $ 41,950.25 | |
| Previously Invoiced: | $ 39,582.50 | |
| Current Invoice: | $ 1,422.75 | |
| Invoiced to Date ($): | $ 41,005.25 | |
| Invoiced to Date (%): | 97.75% | |
| Remaining Budget ($): | $ 945.00 | |
| Remaining Budget (%): | 2.25% |
Comments: Prepared and resubmitted revised NPDES permit plans, Notice of Intent application forms,and response letter to CCCD to address their December 19, 2016 comments.
Reservoir Road Pump Station Design & Permitting
INVOICE SUMMARY
For Services Rendered through: 1/15/2017
| Task No. | Activity | Contract Amount* | Invoiced Effort thru 12/11/2016 | Remaining Budget ($) | Remaining Budget (%) | Completed? |
|---|---|---|---|---|---|---|
| 1 | Concept Design | $13,655.75 | $13,655.75 | - | - | Yes |
| 2 | DEP WQM Pre-App. Meeting | $1,300.00 | $1,300.00 | - | - | Yes |
| 3 | Existing Conditions Survey | $22,783.75 | $22,783.75 | - | - | Yes |
| 4 | Sewer Stakeout in Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 5 | 1636 Bow Tree Dr. Boundary Survey & Easement | $4,020.00 | $4,020.00 | - | - | Yes |
| 6 | Additional Boundary Surveys & Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 7 | Geotechnical Borings | $4,000.00 | $4,000.00 | - | - | Yes |
| 8 | Install Permanent Survey Benchmarks | $0.00 | $0.00 | - | - | Scope eliminated |
| 9 | Progress Design | $29,450.00 | $29,450.00 | - | - | Yes |
| 10 | Infiltration Testing | $1,800.00 | $1,800.00 | - | - | Yes |
| 11 | Final Design | $64,160.25 | $64,160.25 | $0.00 | 0% | No** |
| 12 | Permitting | $41,950.25 | $41,005.50 | $944.75 | 2% | No*** |
| TOTAL | $183,120.00 | $182,175.25 | $944.75 | 0.5% |
*After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, and 11/14/16 approval of $5,000 supplement.
**Need to complete Bid Form and assemble full bid document package for Township once remaining permits are issued.
*** All permit applications have been submitted, and we are awaiting issuance of four remaining permits. NPDES permit revisions have been submitted to the County Conservation District. The other outstanding permits are the PADEP Water Quality Management (WQM) Permit, Army Corps of Engineers federal authorization on the Chester Creek Small Projects Joint Permit, and Chester County Conservation District E&S approval.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 731600
Invoice Date : 01/27/2017
Project : EGMA1505
Project Name : RCSTP and Pump Station O&M Manual
For Services Rendered through: 1/15/2017
Updated O&M Manual to address comments from Mark Miller.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 199.75 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 199.75 |
Amount Due This Invoice: $199.75
| Fee : | 12,500.00 |
|---|---|
| Prior Billings : | 7,123.00 |
| Current Billings : | 199.75 |
| Total Billings : | 7,322.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 119.00 | 29.75 |
| Engineering Technician I | 2.50 | 68.00 | 170.00 |
| Labor Total: | 2.75 | 199.75 |
Total Phase : **** -- Professional Services
| Labor : | $199.75 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1505 – RCSTP and Pump Station O&M Manual
| Labor : | $199.75 |
|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 2-10-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1505 Invoice Summary
Invoice Date 1/27/2017
| Project: | EGMA1505 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP & Pump Station O&M Manual | ||
| Invoice No: | 721600 | ||
| Invoice Period: | 10/17/2016 | to | 1/15/2017 |
| Initial Authorization: | $ 12,500.00 | Date: | 1/27/2017 |
| Contract Amount: | $ 12,500.00 | ||
| Previously Invoiced: | $ 7,123.00 | ||
| Current Invoice: | $ 199.75 | ||
| Invoiced to Date ($): | $ 7,322.75 | ||
| Invoiced to Date (%): | 59% | ||
| Remaining Budget ($): | $ 5,177.25 | ||
| Remaining Budget (%): | 41% |
Budget by Phase:
| Phase Name: | RCSTP & Pump Station O&M Manual |
|---|---|
| Phase Budget: | $ 12,500.00 |
| Previously Invoiced: | $ 7,123.00 |
| Current Invoice: | $ 199.75 |
| Invoiced to Date ($): | $ 7,322.75 |
| Invoiced to Date (%): | 59% |
| Remaining Budget ($): | $ 5,177.25 |
| Remaining Budget (%): | 41% |
Comments: Updated O&M Manual to address comments from Mark Miller.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 731601
Invoice Date : 01/27/2017
Project : EGMA1601
Project Name : 2016 General Services
For Services Rendered through: 1/15/2017
Continued feasibility analysis of potential RCSTP soda ash to caustic soda chemical change including cost estimate, trial run alternatives, and chemical storage tank research; coordination with Dutchland and on-site observation of completion of CIM coating repairs in RCSTP SBR #3; reviewed December MA meeting agenda and RCSTP operator’s report; and attended December MA meeting.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 796.75 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 796.75 |
Amount Due This Invoice: $796.75
| Fee : | 16,395.50 |
|---|---|
| Prior Billings : | 15,598.75 |
| Current Billings : | 796.75 |
| Total Billings : | 16,395.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.50 | 115.00 | 632.50 |
| Senior Engineer | 0.50 | 110.00 | 55.00 |
| Project Engineer | 0.25 | 97.00 | 24.25 |
| Senior Engineering Technician | 1.00 | 85.00 | 85.00 |
| Labor Total: | 7.25 | 796.75 |
Total Phase : **** -- Professional Services
| Labor : | $796.75 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1601 – 2016 General Services
| Labor : | $796.75 |
|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 2-10-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1601 Invoice Summary
Invoice Date 1/27/2017
| Project: | EGMA1601 | ||
|---|---|---|---|
| Pennoni Job No.: | 2016 General Services | ||
| Invoice No: | 731601 | ||
| Invoice Period: | 12/12/2016 | to | 1/15/2017 |
| Initial Authorization: | $ 12,300.00 | Date: | 1/27/2017 |
| Contract Amount: | $ 16,395.50 | ||
| Previously Invoiced: | $ 15,598.75 | ||
| Current Invoice: | $ 796.75 | ||
| Invoiced to Date ($): | $ 16,395.50 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ - | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | 2016 General Services |
|---|---|
| Phase Budget: | $ 16,395.50 |
| Previously Invoiced: | $ 15,598.75 |
| Current Invoice: | $ 796.75 |
| Invoiced to Date ($): | $ 16,395.50 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ - |
| Remaining Budget (%): | 0% |
Comments: Continued feasibility analysis of potential RCSTP soda ash to caustic soda chemical change including cost estimate, trial run alternatives, and chemical storage tank research; coordination with Dutchland and on-site observation of completion of CIM coating repairs in RCSTP SBR #3; reviewed December MA meeting agenda and RCSTP operator’s report; and attended December MA meeting.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 731602
Invoice Date : 01/27/2017
Project : EGMA1701
Project Name : 2017 General Services
For Services Rendered through: 1/15/2017
Initial field assessment of the peeling and bubbling CIM coating in RCSTP SBR #1; prepared January Engineers Report; reviewed January MA meeting agenda and RCSTP operator’s report; and attended January MA meeting.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 563.00 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 563.00 |
Amount Due This Invoice: $563.00
| Fee : | 12,700.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 563.00 |
| Total Billings : | 563.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.00 | 119.00 | 476.00 |
| Senior Engineering Technician | 1.00 | 87.00 | 87.00 |
| Labor Total: | 5.00 | 563.00 |
Total Phase : **** -- Professional Services
| Labor : | $563.00 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1701 – 2017 General Services
| Labor : | $563.00 |
|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 2-10-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1701 Invoice Summary
Invoice Date 1/27/2017
| Project: | EGMA1701 | ||
|---|---|---|---|
| Pennoni Job No.: | 2017 General Services | ||
| Invoice No: | 731602 | ||
| Invoice Period: | NTP | to | 1/15/2017 |
| Initial Authorization: | $ 12,700.00 | Date: | 1/27/2017 |
| Contract Amount: | $ 12,700.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 563.00 | ||
| Invoiced to Date ($): | $ 563.00 | ||
| Invoiced to Date (%): | 4% | ||
| Remaining Budget ($): | $ 12,137.00 | ||
| Remaining Budget (%): | 96% |
Budget by Phase:
| Phase Name: | 2017 General Services |
|---|---|
| Phase Budget: | $ 12,700.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 563.00 |
| Invoiced to Date ($): | $ 563.00 |
| Invoiced to Date (%): | 4% |
| Remaining Budget ($): | $ 12,137.00 |
| Remaining Budget (%): | 96% |
Comments: Initial field assessment of the peeling and bubbling CIM coating in RCSTP SBR #1; prepared January Engineers Report; reviewed January MA meeting agenda and RCSTP operator’s report; and attended January MA meeting.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 731603
Invoice Date : 01/27/2017
Project : EGMA1703
Project Name : 2016 Chapter 94 Reports
For Services Rendered through: 1/15/2017
Initiated work on RCSTP, Chester Creek Collection System, and Westtown Chp. 94 Reports.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 484.50 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 484.50 |
Amount Due This Invoice: $484.50
| Fee : | 15,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 484.50 |
| Total Billings : | 484.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 119.00 | 59.50 |
| Engineering Technician I | 6.25 | 68.00 | 425.00 |
| Labor Total: | 6.75 | 484.50 |
Total Phase : **** -- Professional Services
| Labor : | $484.50 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1703 – 2016 Chapter 94 Reports
| Labor : | $484.50 |
|---|---|
| Expense : | $0.00 |
[Handwritten: ok RS 2-10-17]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1703 Invoice Summary
Invoice Date 1/27/2017
| Project: | EGMA1703 | ||
|---|---|---|---|
| Pennoni Job No.: | 2016 Chapter 94 Reports | ||
| Invoice No: | 731603 | ||
| Invoice Period: | NTP | to | 1/15/2017 |
| Initial Authorization: | $ 15,000.00 | Date: | 1/27/2017 |
| Contract Amount: | $ 15,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 484.50 | ||
| Invoiced to Date ($): | $ 484.50 | ||
| Invoiced to Date (%): | 3% | ||
| Remaining Budget ($): | $ 14,515.50 | ||
| Remaining Budget (%): | 97% |
Budget by Phase:
| Phase Name: | 2016 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 15,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 484.50 |
| Invoiced to Date ($): | $ 484.50 |
| Invoiced to Date (%): | 3% |
| Remaining Budget ($): | $ 14,515.50 |
| Remaining Budget (%): | 97% |
Comments: Initiated work on RCSTP, Chester Creek Collection System, and Westtown Chp. 94 Reports.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
[Handwritten: This Invoice HAS ALREADY BEEN PAID]
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
01/09/2017
Client No: 6604-001R
Invoice No. 175775
General Authority Services
Fees
| Date / Person | Description | Hours |
|---|---|---|
| 12/12/2016 PMM |
Preparation for and attend Authority meeting. | 2.50 |
| 12/13/2016 PMM |
Messages from/to M Gordon regarding O’Connell easement. | 0.20 |
| 12/14/2016 PMM |
Message from and telephone conference with M Gordon regarding Louden/O’Connell easement; Message from O’Connell regarding same. | 0.40 |
| 12/16/2016 PMM |
Message from J O’Connell regarding easement; Email to M Gordon and R Smith regarding same; Telephone conference with R Smith regarding same; Telephone conference with J O’Connell regarding same. | 0.80 |
| 12/19/2016 PMM |
Numerous emails from/to M Gordon regarding O’Connell easement. | 0.60 |
| 12/21/2016 PMM |
Message from J O’Connell. | 0.20 |
| For Current Services Rendered | 4.70 | |
Amount: 940.00
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 4.70 | $200.00 | $940.00 |
| Total Current Charges | 940.00 |
|---|---|
| Balance Due | $940.00 |
[Handwritten: OK TO PAY RS 1-19-17]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
02/07/2017
Client No: 6604-001R
Invoice No. 177124
General Authority Services
Fees
| Date / Person | Description | Hours |
|---|---|---|
| 01/09/2017 PMM |
Review and analyze letter from J O’Connell dated January 5, 2017 regarding 1662 E Boot Road; Preparation for and attend Authority meeting. | 2.00 |
| 01/27/2017 JLB |
Call to J O’Connell to discuss draft letter and agreement | 0.30 |
| 01/31/2017 PMM |
Telephone conference with A Sundquist regarding West Goshen Municipal Authority Meeting; Email from A Sundquist regarding same; Emails to/from EGMA and R Smith regarding same. | 0.80 |
| For Current Services Rendered | 3.10 | |
Amount: 597.50
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 2.80 | $200.00 | $560.00 |
| Jody L. Bowden | 0.30 | 125.00 | 37.50 |
| Previous Balance | $940.00 |
|---|---|
| Total Current Charges | 597.50 |
| 01/27/2017 Payment | -940.00 |
| Balance Due | $597.50 |
[Handwritten: OK TO PAY 2-10-17]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA January Financial Report |
| Date: | February 9, 2017 |
In January, the Municipal Authority recorded $595 in interest income and $9,249 in expenses, for a negative variance of $8,654. Expenses included $4,340 in regular engineering; $2922 in engineering for the Reservoir Road Pump Station, $940 for legal expenses and $984 for PMAA membership.
As of January 31st, the fund balance was $1,405,997, of which $1,371,512 is in the main construction account (most of which represents the 2013 note).
A complete list of all year-to-date expenses and revenues is provided.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
January 2017
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 1,415,650.50 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 3,250.00 | 594.59 | 594.59 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 3,250.00 | 594.59 | 594.59 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO SEWER SINKING FUND | 07492 0550 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | 3,250.00 | 594.59 | 594.59 | |
U:\bmccool\2017\Municipal Authority\2017 - 01 - Municipal Authority Report.xlsx
Page 1 of 3
02/08/2017
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
January 2017
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 10.00 | 0.23 | 0.23 |
| C.C. TAPPING FEES | 07364 1100 | 14,296.00 | 0.00 | 0.00 |
| R.C.TAPPING FEES | 07364 1110 | 0.00 | 0.00 | 0.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 0.00 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 100,755.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 115,061.00 | 0.23 | 0.23 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 31,620.00 | 0.00 | 0.00 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500.00 | 987.52 | 987.52 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,078.00 | 0.00 | 0.00 |
| ENGINEERING SERVICES | 07424 3130 | 37,500.00 | 4,399.50 | 4,399.50 |
| LEGAL SERVICES | 07424 3140 | 9,250.00 | 940.00 | 940.00 |
| M.C.-DVREFA-DEBT SERVICE | 07471 1000 | 26,320.00 | 0.00 | 0.00 |
| M.C.-DVREFA-INTEREST PAYMN | 07472 1000 | 0.00 | 0.00 | 0.00 |
| M.C.-DVREFA-INTEREST PAYMN | 07472 1010 | 2,043.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 118,311.00 | 6,327.02 | 6,327.02 | |
| OPERATING NET RESULT | (3,250.00) | (6,326.79) | (6,326.79) | |
U:\bmccool\2017\Municipal Authority\2017 - 01 - Municipal Authority Report.xlsx
Page 2 of 3
02/08/2017
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
January 2017
CAPITAL BUDGET
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 0.00 | 0.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 0.00 | 0.00 | 0.00 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 0.00 | 0.00 | 0.00 |
| MANHOLE COVER REPLACEMENTS | 07424.7405 | 0.00 | 0.00 | 0.00 |
| C.C. CAPITAL - COLLECTION | 07424.7420 | 212,486.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0.00 | 2,921.50 | 2,921.50 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| ASBSTOS CONCRETE ENGINEERING | 07429 3130 | 0.00 | 0.00 | 0.00 |
| DIVERSION PROJ. - LEGAL | 07429 3166 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 212,486.00 | 2,921.50 | 2,921.50||
| CAPITAL NET RESULT | (212,486.00) | (2,921.50) | (2,921.50) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 1,406,996.80 | |||
U:mccool7\Municipal Authority7 - 01 - Municipal Authority Report.xlsx Page 3 of 3 02/08/2017
East Goshen Township General Ledger
Report Date 02/08/17 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 12 : 15 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | INTEREST EARNINGS | 0.00 | ||||||||
| 1701 | JE | 56730 | 0.23 | 02/03/17 | INTEREST | INTEREST EARNED JANUARY 2017 07 FUND |
||||
| 07341-1000 | **** | *** | ***** | 0.00 | 0.23 | -0.23 | ||||
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 0.00 | ||||||||
| 594.59 | 02/03/17 | INTEREST | INTEREST EARNED JANUARY 2017 07 FUND |
|||||||
| 07341-1020 | **** | *** | ***** | 0.00 | 594.59 | -594.59 | ||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 0.00 | ||||||||
| CD | 56280 | 984.30 | 01/04/17 | 3040 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2017 ACTIVE MEMBERSHIP DUES |
||||
| 56424 | 3.22 | 01/13/17 | 3041 | 425 | EAST GOSHEN TOWNSHIP - GENERAL CORRECT BB&T DEPOSIT OF REMAININ BALANCE OF CLOSED ACCT.1100.1010 07100.1000 |
|||||
| 07424-3000 | **** | *** | ***** | 987.52 | 0.00 | 987.52 | ||||
| 07424-3130 | ENGINEERING SERVICES | 0.00 | ||||||||
| 56425 | 4,399.50 | 01/13/17 | 3042 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 10/16/16 RCSTP & P STATION |
|||||
| 07424-3130 | **** | *** | ***** | 4,399.50 | 0.00 | 4,399.50 | ||||
| 07424-3140 | LEGAL SERVICES | 0.00 | ||||||||
| 56550 | 940.00 | 01/25/17 | 3043 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - DEC. 2016 GEN.AU |
|||||
| 07424-3140 | **** | *** | ***** | 940.00 | 0.00 | 940.00 | ||||
| 07428-1000 | RESERVOIR PUMP STATION - ENGINEER | 0.00 | ||||||||
| 56426 | 2,546.50 | 01/13/17 | 22002 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 10/16/16 RESERV.RD |
|||||
| 56551 | 375.00 | 01/25/17 | 22003 | 263 | CHESTER COUNTY CONSERVATION DISTRICT RESERVOIR RD. NPDES PLAN REVIEW |
|||||
| 07428-1000 | **** | *** | ***** | 2,921.50 | 0.00 | 2,921.50 | ||||
| Grand Total | 9,248.52 | 594.82 | 8,653.70 | |||||||
East Goshen Township General Ledger
Report Date 02/08/17 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 12 : 15 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
MEMORANDUM
| TO: | East Goshen Municipal Authority Rick Smith, Township Manager Mark Miller, Public Works Director |
|---|---|
| CC: | Scott Towler, Big Fish Environmental |
| FROM: | Michael Ellis, PE |
| DATE: | February 10, 2017 |
| SUBJECT: | RCSTP Alkalinity Chemical Feed Alternatives |
Background
The Ridley Creek Sewage Treatment Plant (RCSTP) currently uses 350 to 450 lbs/day of sodium carbonate (soda ash) for pH control and alkalinity addition. The chemical is delivered in pallets of 50-lb bags. Each pallet contains 20 bags for a weight of 1000 lbs/pallet. Two pallets are currently delivered to the RCSTP each week. On average, 8-9 bags are loaded into the SBRs each day (2-3 bags/SBR tank/day).
Upon delivery, the pallets are unloaded and transported to the top of the paved access path and stored in a shed that is located next to the SBR walkway. The shed floor is at the same level as the SBR walkway. However, the pallets can only be transported when the PW Department brings their excavator/loader to the plant, which typically occurs every 1-2 weeks. When deliveries are made without the excavator/loader at the plant, the pallets are set and stored in the original control building, which is approximately 22 feet below the SBR walkway, until they can be moved to the upper shed. The soda ash bags are carried by the operator from the shed and manually fed directly into the top of the SBR tanks. Periodically, the bags have to be manually carried from the original control building up the stairs to the SBR tanks.
This soda ash operation is not ideal due to inefficient feeding and transporting and operator safety concerns. The shed is also not sized to accommodate multiple pallets. Further, the plant is currently operating at approximately 50% of its design capacity, so the amount of chemical to be fed to the SBRs could double once the plant is at or near full capacity in the future.
Pennoni was asked to briefly review the situation and develop alternatives and recommendations as to other available forms of alkalinity addition and/or automated chemical feeders.
Alkalinity
Alkalinity is the ability of an aqueous solution to neutralize an acid (in other words, the strength of the bases in the solution). Alkalinity addition is used to supplement the alkalinity consumed in the nitrification process and the alkalinity that is used to neutralize the acidity from alum addition, and to a lesser degree PAC addition for phosphorous removal. It also assists the operator with maintaining SBR pH above 7.0 standard units. Without a source of alkalinity, the treatment for total nitrogen and phosphorus removal would be jeopardized.
EGMA1601 February 10, 2017 Page 2
East Goshen Municipal Authority RCSTP Alkalinity Alternatives
The common forms of alkalinity are: sodium carbonate (soda ash), sodium bicarbonate (baking soda), magnesium hydroxide (milk of magnesia), sodium hydroxide (caustic soda), and hydrated calcium hydroxide (lime). Sodium bicarbonate and magnesium hydroxide have advantages that they provide buffering to a treatment process. The pH will not rise above 8.3. The other chemicals require pH monitoring to ensure that the pH stays in the neutral range.
Liquid and Dry Chemicals
Liquid chemical is transported in drums, 350 gallon totes, or bulk carrier (tanker truck). For some liquid chemicals, partial bulk loads are available.
Liquid chemical can be fed from a drum, tote, or bulk storage tank. If receiving a full truck load, the bulk tank needs to be large enough to receive a truck load while maintaining a residual volume of liquid chemical.
Dry chemical is transported in bags, 1-ton super sacks, or 20-ton bulk carriers.
Dry chemical can be fed neat as a powder or as a liquid solution or slurry. To feed as a powder, the chemical is fed from a bin with a screw conveyor directly into an application point. The screw conveyor is used to feed chemical into a solution tank from which a liquid feeder is used. For the RCSTP, we recommend a solution feeder.
The bin can be filled from a silo, elevating a super sack above it, or dumping in individual bags. If the product is free running such as sodium bicarbonate, the bin is separated from the silo. If the product is not, then the silo can be placed over the bin. If the bin is being filled by bags, an elevated stand with a pallet jack is normally provided so that the operator has an easier time of handling the bags. The super sack is either hoisted into place with a dedicated gantry hoist, or a fork truck can be used. Using a small screw conveyor to transfer super sacks or bags into a smaller silo or larger bin is a possibility. In this way, smaller quantities can be received and handled.
Alkalinity Chemical Alternatives
The dry alkalinity chemicals are hydrophilic so dry air must be circulated through a bin or silo to prevent clumping.
- Sodium carbonate (soda ash) is typically delivered as a dry chemical. It is available as a 15% solution in drums or totes. At 1.4 lbs/gallon, one tote would last less than two days. If sodium carbonate would be continued to be used for this application, the product would need to be received dry. A silo, a larger bin with super sack or bag transfer, or a bag fed solution tank could be used to store and feed chemical.
- Sodium bicarbonate (baking soda) is typically delivered as a dry chemical. Sixty percent more sodium bicarbonate would need to be fed than the current sodium carbonate. This product would be handled similarly as the sodium carbonate.
- Magnesium hydroxide is delivered as a truck load slurry. The weight percent is approximately 50 percent. Feeding magnesium hydroxide slurry has its own problems. The slurry cannot be allowed to sit. If the pump stops, the pump, discharge piping, and suction piping need to be flushed. Large plants are candidates for magnesium hydroxide.
EGMA1601 February 10, 2017 Page 3
East Goshen Municipal Authority RCSTP Alkalinity Alternatives
- Sodium hydroxide (caustic soda) is delivered as a liquid, typical solution weight percentages are 25 and 50 percent. 50 percent caustic will freeze or solidify at 55°F. 25 percent caustic freezes at minus 20°F so it will not freeze in our climate. There are savings in transportation costs with 50 percent caustic. However, most plants of the RCSTP size opt for the 25 percent to avoid the handling requirements of the more concentrated chemical.
- Hydrated calcium hydroxide (lime) has two issues. It is received as a dry chemical, and to feed in the liquid form it needs to be slurry since its solubility is low and it would be impractical to feed it as a solution.
Recommendation – 25% caustic soda is recommended since it is liquid chemical and will not require the additional equipment and operation of a dry chemical application. Further, the liquid chemical can be stored outside and can be delivered as a liquid in mini-bulk.
Chemical Feed Location and Control Alternatives
The pH in each SBR tank is currently manually checked daily by the operator. It is our understanding that continued manual pH sampling is preferred since it is not a hardship to the staff and to avoid additional maintenance and periodic inaccurate data that can be typical of automated pH probes in wastewater.
- Directly into SBR tanks. This would require four separate chemical feed pumps and piping systems from the chemical feed tank. It would also require automated monitoring of pH in each individual tank and a control system for the dosing to each tank, or daily manual re-setting of the four feed pumps at a constant rate based upon manual pH readings.
- Into the pressure wastewater piping between the influent wet well and SBR tanks. This would require the chemical feed to be injected into a pressurized pipe, which is not the most desirable alternative. However, only one chemical feed pump would be needed, and it could be set to inject chemical at a set rate when the wet well pumps run.
- Into the Influent Wet Well or Screen Building. The chemical would be fed directly into the wet well or screen building channel. This would require one chemical feed pump system and would likely be the least costly alternative. The chemical feed could be manually set at a constant rate at all times and be reset by the operator as needed based on manual pH readings. Alternatively, it could be automatically controlled via influent flow metering, wet well pump on-off cycles, or automated pH monitoring in the SBR tanks. It may also be possible to set up a single automated pH monitoring probe on the common discharge piping between the SBR tanks and the equalization tanks.
Recommendation – Inject the caustic soda into the channel in the screen building so as to only need one chemical feed pump that can be programmed to pump at a constant rate at all times with manual adjustments made by the operator as needed based on manual pH readings in the SBR tanks. This avoids the cost, maintenance, and reliability concerns of additional pumps, automation, and controls.
Storage Tank
Based upon the current consumption of soda ash, an average of 125 gpd of 25% caustic soda is estimated to be used. Since the plant is operating at approximately half its hydraulic design capacity now, this quantity could double if/when the plant becomes fully loaded. Jar testing should be performed to confirm this caustic soda demand and to set a feed rate.
EGMA1601 February 10, 2017 Page 4
East Goshen Municipal Authority RCSTP Alkalinity Alternatives
According to Coyne Chemical, their largest bulk delivery is 45,000 pounds, which is approximately 4,200 gallons of caustic soda. This would last approximately 33 days at the current average usage of 125 gpd. However, the delivery companies have been reluctant to make bulk deliveries due to truck access challenges. For planning purposes, if the chemical storage tank were sized to hold a full bulk delivery volume while still holding several days of residual operating volume, we would recommend a 6,000-gallon tank, which will be somewhat larger than currently needed but will be sized to better accommodate the needs if/when the plant is at its full hydraulic loading capacity.
Coyne Chemical offers a tank level monitoring system with a liquid level sensor and cellular communication system that allows them to monitor the liquid level and to schedule deliveries as needed without requiring notification from the operator. This also allows them to make partial deliveries when they are in the area with a delivery truck with a small volume leftover, potentially at decreased costs. Coyne will typically install and maintain this system, including any cellular fees, at no cost to the client.
The tank can be located outside next to the screen building. It could be positioned in the footprint of the old equalization tank if that tank were to be demolished. It should be a high density cross-linked polyethylene (HDXLPE) double containment tank placed inside a containment curb to contain spill and drips. The chemical feed pump(s), electric supply/outlets, and any controls would need to be in a weather-protected environment, but they are not recommended inside the screen building since that is a Class 1 Div 1 hazardous space, requiring significant increased costs for explosion proof equipment. The most cost effective solution would be to place the pump(s), electric, and any controls in a small heated shed or hot box adjacent to the new tank and screen building.
Trial Approach
The Municipal Authority has inquired if an inexpensive test/trial run of the caustic soda feed into the screen building could be established for a couple months prior to committing to a permanent treatment change. There are two approaches: (1) pump from totes, or (2) pump from a small tank with mini-bulk service. Our understanding is that the chemical delivered costs are similar for either option. Pumping from totes would require that totes be moved every 3 to 4 days.
A 1500-gallon temporary tank could be used to hold the caustic inside a containment system. The metering pumps could also be wrapped in plastic sheeting for wet weather protection and placed inside the containment. The containment would have dimensions of 15 feet x 15 feet and a height of 12 inches. The temporary plastic containment would be constructed of wood and lined with a heavy mil HDPE plastic sheeting. The containment and tank would be placed on a well compacted modified crushed stone pad with plywood on top. Feed tubing could be run inside of PVC carrier pipe to take suction from the tank to the pumps to the discharge point.
The pumps would be electronic solenoid pumps and require 120 volts. The pumps would run 24 hours per day at a constant flow rate. Estimated costs for this trial run set up with a 1500-gallon tank follow:
EGMA1601 February 10, 2017 Page 5
East Goshen Municipal Authority RCSTP Alkalinity Alternatives
| Tank and Pump Installation | $ 20,450 | |
|---|---|---|
| Electrical installation | $ 6,750 | |
| Subtotal | $ 27,200 | |
| Contingency | $ 5,440 | |
| Subtotal | $ 32,640 | |
| Contractor @ 10% | $ 3,264 | |
| Subtotal | $ 35,904 | |
| Engineering & permitting @ 20% | $ 7,181 | |
| Total | $ 43,085 |
Alternatively, totes could be placed inside the containment with a fork truck. A tote platform would be elevated so that the platform top would be higher than the containment walls. The estimated costs for this trail run set up follow:
| Tank and Pump Installation | $ 14,950 | |
|---|---|---|
| Electrical installation | $ 6,750 | |
| Subtotal | $ 21,700 | |
| Contingency | $ 4,340 | |
| Subtotal | $ 26,040 | |
| Contractor @ 10% | $ 2,604 | |
| Subtotal | $ 28,644 | |
| Engineering & permitting @ 20% | $ 5,729 | |
| Total | $ 34,373 |
Permitting
Since this is a change to the treatment process, an amendment to the plant’s Water Quality Management Part II Permit would likely be required even for a trial run. This permit application would need to include permit forms, a narrative, and design plans. The application would take 1-2 months to prepare, and DEP has 4 months to review the application. We anticipate that review could be completed in a shorter period of time, but the entire process is likely to take 4-6 months from approval to proceed to permit issuance.
Costs and Payback Period
In 2016, the plant accepted 152,850 pounds of soda ash. The chemical was delivered in 3,057 fifty-pound bags. The total cost to the Township from their Vender Expenditure History report was $45,309 for the year.
The estimated equivalent quantity of 25% caustic soda is 43,903 gallons per year. For mini-bulk service, we have received a cost from Coyne Chemical of $1.50 per gallon delivered. The estimated cost for an equivalent quantity of 25% caustic solution is $66,000 per year.
A caustic tank has not been included in the capital costs. Our understanding is that the tanks can be provided by the chemical supplier.
EGMA1601 February 10, 2017 Page 6
East Goshen Municipal Authority RCSTP Alkalinity Alternatives
Our opinion of probable design, permitting, and construction costs for a permanent caustic soda treatment alternative follows:
| Tank and Pump Installation | $ 40,850 | |
|---|---|---|
| Electrical installation | $ 28,800 | |
| Subtotal | $ 69,650 | |
| Contingency | $ 13,930 | |
| Subtotal | $ 83,580 | |
| Contractor @ 10% | $ 8,358 | |
| Subtotal | $ 91,938 | |
| Engineering & permitting @ 20% | $ 18,388 | |
| Total | $ 110,326 |
END OF MEMO